Page 1
ANNUAL COUNCIL MEETING
AGENDA
MAY 11, 2015 - 7:30 P.M.
REVISED BY ADDING THE SINGING OF THE NATIONAL ANTHEM AND DELETING THE FIRE CHIEF’S
MONTHLY REPORT
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
INVOCATION BY FATHER JAMES LENTINE
PRESENTATION OF THE COLORS - DOVER AIR FORCE BASE HONOR GUARD
PLEDGE OF ALLEGIANCE LED BY CUB SCOUT TROOP #154
NATIONAL ANTHEM - OLIVIA GIGLIO
AGENDA ADDITIONS/DELETIONS
1. ADOPTION OF MINUTES
A. SPECIAL COUNCIL MEETING OF APRIL 27, 2015
B. REGULAR COUNCIL MEETING OF APRIL 27, 2015
2. LETTER OF SUPPORT FOR DOWNTOWN DEVELOPMENT DISTRICT PROGRAM
3. PROPOSED RESOLUTIONS/PRESENTATIONS
A. NO. 2015-04 - DAVID L. BONAR
B. NO. 2015-05 - WALLACE R. DIXON
C. NO. 2015-06 - ADAM M. PERZA
D. NO. 2015-07 - BEVERLY C. WILLIAMS
4. STATE OF DELAWARE TRIBUTES
A. DAVID L. BONAR
B. WALLACE R. DIXON
C. ADAM M. PERZA
D. BEVERLY C. WILLIAMS
5. OATHS OF OFFICE ADMINISTERED BY THE HONORABLE WILLIAM L. WITHAM JR.,
RESIDENT JUDGE - SUPERIOR COURT, AND THE HONORABLE KENNETH S. CLARK, JR.,
JUDGE - SUSSEX COUNTY COURT OF COMMON PLEAS
MAYOR - ROBIN R. CHRISTIANSEN
COUNCIL - FIRST DISTRICT - JAMES E. HOSFELT, JR.
COUNCIL - SECOND DISTRICT - BRIAN E. LEWIS
COUNCIL - THIRD DISTRICT - SCOTT W. COLE
COUNCIL - FOURTH DISTRICT - ROY SUDLER, JR.
Page 2
COUNCIL AGENDA - MAY 11, 2015 PAGE 2
6. ELECTION OF COUNCIL PRESIDENT/VICE-MAYOR
7. RECESS FOR PHOTOGRAPHS (MAYOR AND COUNCIL)
8. PROCLAMATIONS
A. COMMUNITY ACTION MONTH
B. PUBLIC WORKS WEEK
9. STATE OF THE CITY MESSAGE - MAYOR ROBIN R. CHRISTIANSEN
* 10. CONSENT AGENDA
THOSE ITEMS ON THE COUNCIL AGENDA WHICH ARE CONSIDERED ROUTINE AND NON-
CONTROVERSIAL SHALL BE MARKED WITH AN ASTERISK (*) AND WILL BE ACTED UPON BY A
SINGLE ROLL CALL VOTE OF THE COUNCIL. THERE WILL BE NO SEPARATE DISCUSSION OF THESE
ITEMS UNLESS A MEMBER OF COUNCIL SO REQUESTS, IN WHICH EVENT THE MATTER SHALL BE
REMOVED FROM THE CONSENT AGENDA AND CONSIDERED A SEPARATE ITEM.
* 11. SAFETY ADVISORY AND TRANSPORTATION COMMITTEE REPORT - APRIL 27, 2015
A. PROPOSED ORDINANCE #2015-07 AMENDING CHAPTER 46 - FIRE PREVENTION AND
PROTECTION, ARTICLE IV - PUBLIC OCCUPANCIES, SECTION 46-162 - SPRINKLER
REQUIREMENTS AND SECTION 46-171 - FIRE ALARM IN PLACE OF ASSEMBLY
(COMMITTEE RECOMMENDED ADOPTION OF ORDINANCE #2015-07)(SEE ITEM #23)
B. EVALUATION OF PROPOSALS - AMBULANCE SERVICE CONTRACT
(COMMITTEE RECOMMENDED AUTHORIZING THE CITY MANAGER TO ENTER INTO A
CONTRACT WITH PRIMECARE MEDICAL TRANSPORT, LLC IN THE AMOUNT OF $230,000 TO
PROVIDE AMBULANCE SERVICES TO THE CITY OF DOVER FOR A THREE (3) YEAR PERIOD,
WITH A NEGOTIATED ENDING DATE OF JUNE 30, 2018, AS RECOMMENDED BY STAFF)
(COMMITTEE RECOMMENDED PLACING A DISCUSSION OF THE FEASIBILITY OF CREATING A
COMMITTEE TO STUDY THE BASIC LIFE SAFETY (BLS) NEEDS FOR THE CITY OF DOVER ON
THE AGENDA FOR THE NEXT SAFETY ADVISORY AND TRANSPORTATION COMMITTEE MEETING)
C. BRIEFING ON DELAWARE DEPARTMENT OF TRANSPORTATION (DELDOT) PROJECTS
(COMMITTEE ACTION NOT REQUIRED)
12. LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT - APRIL 27, 2015
* A. EVALUATION OF PROPOSAL - INVESTMENT BANKING CUSTODY SERVICES
(COMMITTEE RECOMMENDED THAT STAFF CONTACT ALL RESPONDING BANKS TO REQUEST
THEIR BEST AND FINAL OFFERS FOR INVESTMENT BANKING CUSTODY SERVICES FOR A THREE
(3) YEAR PERIOD TO START THE DATE OF CONTRACT AND MAY BE RENEWED OR EXTENDED
FOR TWO (2) ADDITIONAL TWO (2) YEAR PERIODS BY MUTUAL CONSENT AND APPROVAL OF
CITY COUNCIL)
B. DOWNTOWN DOVER BUSINESS IMPROVEMENT DISTRICT (BID) BUDGET AND
ASSESSMENT (TAX) RATES FOR FISCAL YEAR 2015-2016
(COMMITTEE RECOMMENDED APPROVAL OF THE PROPOSED BUDGET AND ASSESSMENT
(TAX) RATE FOR FISCAL YEAR 2015-16)
Page 3
COUNCIL AGENDA - MAY 11, 2015 PAGE 3
* 13. MONTHLY REPORTS - MARCH 2015
A. CITY ASSESSOR’S REPORT D. CONTROLLER/TREASURER’S BUDGET REPORT
B. CITY MANAGER’S REPORT E. ECONOMIC DEVELOPMENT OFFICE REPORT
C. CITY PLANNER’S REPORT F. POLICE CHIEF’S REPORT
* 14. QUARTERLY REVIEW OF CAPITAL INVESTMENT PLAN (CIP) (JANUARY, FEBRUARY, AND
MARCH)
* 15. 2015/16 STAFF APPOINTMENTS - CITY COUNCIL
A. CITY ASSESSOR G. ASSISTANT TREASURERS
B. BUILDING INSPECTOR H. FIRE MARSHAL
C. CITY CLERK I. CITY PLANNER
D. ASSISTANT CITY CLERK J. CITY SOLICITOR
E. CONTROLLER/TREASURER K. DEPUTY CITY SOLICITOR
F. ASSISTANT CONTROLLER/TREASURER
16. 2015/16 COMMITTEE APPOINTMENTS - COUNCIL PRESIDENT
A. CITY CHAPLAINS
B. CIVILIAN PENSION PLAN - BOARD OF TRUSTEES
C. COMPENSATION COMMISSION
D. CONSTRUCTION CODE APPEALS COMMITTEE
E. LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
F. OTHER POST-EMPLOYMENT BENEFITS (OPEB) TRUST FUND BOARD
G. PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
H. POLICE PENSION PLAN - RETIREMENT COMMITTEE
I. SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
J. UTILITY COMMITTEE
17. 2015/16 MISCELLANEOUS APPOINTMENTS - COUNCIL PRESIDENT
A. CENTRAL DELAWARE CHAMBER OF COMMERCE - LIAISON MEMBER
B. CITY/COUNTY COMMITTEE (LIAISON TO KENT COUNTY)
C. KENT COUNTY TOURISM BOARD OF DIRECTORS - VOTING LIAISON MEMBER
D. KENT ECONOMIC PARTNERSHIP BOARD OF DIRECTORS - VOTING LIAISON MEMBER
18. APPOINTMENTS RECOMMENDED BY COUNCIL PRESIDENT
A. PRESIDENT’S COUNSEL ON PUBLIC/PRIVATE PARTNERSHIPS AND THE FUTURE OF CITY
HALL, WEYANDT HALL, FORMER DOVER LIBRARY, AND OTHER CITY PROPERTIES
B. AD HOC FINANCIAL AND OPERATIONAL ADVISORY COMMITTEE
* 19. 2015/16 COMMITTEE APPOINTMENTS - MAYOR
A. COMPENSATION COMMISSION
B. DOVER 4TH OF JULY CELEBRATION COMMITTEE
C. DOVER PUBLIC LIBRARY ADVISORY COMMISSION
D. DOWNTOWN DOVER PARTNERSHIP BOARD OF DIRECTORS
E. ELECTION BOARD
F. PROPERTY MAINTENANCE BOARD OF APPEALS
G. SILVER LAKE COMMISSION
Page 4
COUNCIL AGENDA - MAY 11, 2015 PAGE 4
* 20. APPOINTMENTS RECOMMENDED BY MAYOR CHRISTIANSEN - PUBLIC ADVISORY
COMMITTEE OF THE DOVER-KENT COUNTY MPO
A. JONATHAN CONTANT (TO FILL THE UNEXPIRED TERM OF PRAMEELA KAZA - TERM TO
EXPIRE JULY 2015)
B. KAREN MCGLOUGHLAN (ALTERNATE)
* 21. COUNCIL APPOINTMENTS - YOUTH ADVISORY COMMITTEE - ONE (1) YEAR TERMS TO
EXPIRE MAY 9, 2016
A. REBECCA ANDERSON
B. AUSTIN C. AUEN
C. JESSICA DEITRICH
D. KENNADIE PATTERSON
E. JESSICA SIMMONS
* 22. RESOLUTIONS
A. NO. 2015-08 - APPROVAL OF 2015 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
FIVE (5) YEAR CONSOLIDATED PLAN
B. NO. 2015-09 AUTHORIZING SIGNATURES FOR BANKING SERVICES ON BEHALF OF THE
C ITY OF D OVER , D ELAWARE - C ONTROLLER /T REASURER , A SSISTANT
CONTROLLER/TREASURER, AND ASSISTANT TREASURERS
23. FIRST READING - PROPOSED ORDINANCE #2015-07
THE FIRST READING IS OFFERED ON THE PROPOSED ORDINANCE. THE FINAL READING OF
THE ORDINANCE AND ACTION BY COUNCIL WILL TAKE PLACE ON MAY 26, 2015. COPIES OF
ALL PROPOSED ORDINANCES ARE AVAILABLE AT THE ENTRANCE OF THE COUNCIL CHAMBERS
OR CAN BE OBTAINED FROM THE CITY CLERK'S OFFICE.
A. PROPOSED ORDINANCE #2015-07 AMENDING CHAPTER 46 - FIRE PREVENTION AND
PROTECTION, ARTICLE IV - PUBLIC OCCUPANCIES, SECTION 46-162 - SPRINKLER
REQUIREMENTS AND SECTION 46-171 - FIRE ALARM IN PLACE OF ASSEMBLY
24. COUNCIL MEMBERS’ ANNOUNCEMENTS
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\COUNCIL-AGENDAS\2015\05-11-2015 ANNUAL-REVISED.WPD
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 5
SPECIAL COUNCIL MEETING
CORRECTED
A Special Council Meeting was held on April 27, 2015 at 5:00 p.m. with Council President Bonar
presiding. Members present were Mr. Anderson, Mr. Dixon, Mr. Perza (arrived at 5:09 p.m.),
Mr. Slavin, Mrs. Williams, Mr. Hare (arrived at 5:02 p.m.), and Mr. Hutchison.
Mayor Christiansen, Council-Elect Neil, Hosfelt, and Sudler (arrived at 5:12 p.m.), Mr. Koenig,
Mrs. Mitchell, Mrs. McDowell, and Mr. Neaton were also present.
AGENDA ADDITIONS/DELETIONS
Mayor Christiansen requested that “Information Update” be added to the agenda.
Mr. Anderson moved for approval of the agenda, as amended, seconded by Mr. Dixon and
unanimously carried.
Mr. Slavin moved to recess into Executive Session pursuant to 29 Del. C. §10004(b)(2) -
Preliminary Discussions on Site Acquisitions for Any Publicly Funded Capital Improvements,
or Sales or Leases of Real Property; and (b)(9) - Personnel Matters (Council Appointed
Employee Performance Evaluation). The motion was seconded by Mr. Dixon and
unanimously carried.
Special Council Meeting recessed at 5:02 p.m. and reconvened at 5:32 p.m.
POTENTIAL ACTION RESULTING FROM THE EXECUTIVE SESSION
Sale of Land
During the Executive Session members were advised of a proposal for the sale of a lot at the
Garrison Oak Technology Park.
Mrs. Williams moved to authorize the City Manager to move forward with negotiating the
contract, to include a claw-back provision, for the sale of the lot at the price recommended,
and to ascertain whether it would be feasible to remove the structures utilizing the Fire
Department for a controlled burn. The motion was seconded by Mr. Anderson and carried
by a unanimous roll call vote.
Mr. Slavin moved to recess into Executive Session pursuant to 29 Del. C. §10004(b)(9) -
Personnel Matters (Council Appointed Employee Performance Evaluation). The motion was
seconded by Mr. Dixon and unanimously carried.
Special Council Meeting recessed at 5:34 p.m. and reconvened at 5:59 p.m.
Follow-Up Evaluation - City Manager, Mr. Koenig
An Executive Session was held to continue discussions related to Mr. Scott Koenig’s April 8, 2015
performance evaluation.
Mrs. Williams moved to approve a $5,000 pay increase for City Manager Scott Koenig
effective April 27, 2015. The motion was seconded by Mr. Anderson and carried by a roll call
vote of five (5) yes (Anderson, Dixon, Williams, Hutchison, and Bonar) and three (3) no (Perza,
Slavin, and Hare).
Page 6
SPECIAL COUNCIL MEETING OF APRIL 27, 2015 PAGE 2
Mr. Hare moved for adjournment, seconded by Mr. Anderson and unanimously carried.
Meeting Adjourned at 6:01 p.m.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Special Meeting of
April 27, 2015 are hereby approved.
ROBIN R. CHRISTIANSEN
MAYOR
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Council-Minutes\2015\04-27-2015 SPECIAL-Corrected.wpd
Page 7
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on April 27, 2015 at 7:30 p.m. with Council President Bonar
presiding. Council members present were Mr. Anderson, Mr. Dixon, Mr. Perza, Mr. Slavin,
Mrs. Williams, Mr. Hare, and Mr. Hutchison.
Council staff members present were Deputy Police Chief Mailey, Mrs. Mitchell, Mrs. Townshend,
Fire Chief Hall, Mr. Koenig, City Solicitor Rodriguez, and Mrs. McDowell. Mayor Christiansen
was also present.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Bonar declared the Open Forum in session and reminded those present that
Council was not in official session and could not take formal action.
Mr. Bruce Mac Gloan, 53 Planters Run Court, Dover, stated that he was a disabled veteran, a
homeowner, and a registered nurse with a Bachelor's degree. He moved to Dover a little more than
a year ago and, since he did not have a computer, he went to the Dover Public Library to use a
computer and took a computer course. Mr. Mac Gloan stated that he felt that the instructor, who was
a black man, discriminated against him, noting that when he asked questions, the instructor brushed
him off; however, the instructor treated the black participants in the class very well. Mr. Mac Gloan
informed members that he had shared his concerns with Mr. Scott Koenig, City Manager, and
Ms. Margie Cyr, Library Director. Mr. Mac Gloan stated that, instead of looking into his complaints,
they kicked him out of the library for 12 months.
Mr. Mac Gloan referenced the City of Dover employee handbook, noting that it stated that
employees are supposed to treat the citizens in a courteous manner and are not supposed to
discriminate against people. He reiterated that he had been discriminated against and treated very
badly. Mr. Mac Gloan indicated that he had never been to a place where complaints about an
employee’s work were not investigated and the fault is placed on the complainant.
Mr. Mac Gloan stated that he had also informed Ms. Cyr that there were men on drugs passed out
in the library; however, no action was taken. He informed members that he had never seen a library
so disruptive and so crazy as the Dover Public Library, noting that there were kids with their
rear-ends hanging out, and making disturbances while he was trying to use the computer to look up
a job, and staff did not tell them to behave.
Mr. Tyrone Ratu, 742 Slaughter Street, Dover, expressed concern regarding racial profiling in Dover,
noting that cops were pulling people over daily for traffic violations. He felt that racial profiling was
really getting out of control in Dover and he wished it would stop. Mr. Ratu stated that he had been
pulled over numerous times by Dover police officers for frivolous things. He found it ridiculous that
there were people being lynched at Silver Lake, investigations that were never followed up on, and
people getting murdered. Mr. Ratu expressed his hope that the Dover Police Department would be
held accountable for their acts and tighten up; otherwise, he stated that Black Supremacy, Black
Liberation and Black Freedom would be out there. Mr. Ratu declared Black Power, and
acknowledged Freddie Grant, R.I.P.; Mike Brown, R.I.P.; and Walter Scott, R.I.P.
Page 8
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 2
The invocation was given by Councilman Dixon, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda, seconded by Mrs. Williams and
unanimously carried.
Mr. Hare moved for approval of the Consent Agenda, seconded by Mr. Slavin and carried by
a unanimous roll call vote.
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF APRIL 13, 2015
The Minutes of the Regular Council Meeting of April 13, 2015 were unanimously approved
by motion of Mr. Hare, seconded by Mr. Slavin and bore the written approval of
Mayor Christiansen.
PRESENTATION-MAYOR'S SELECTION FOR THE JEFFERSON AWARDS LEAD360
CHALLENGE
Mayor Christiansen welcomed Ms. Alison Wade, Program Manager, Jefferson Awards Foundation,
Ms. Alyssa Pastolove, Intern, Jefferson Awards Foundation, and a Senior at the University of
Delaware, and Ms. Michele Fidance, National Director for the Jefferson Awards.
Ms. Wade reviewed a presentation entitled “LEAD360 Awards Ceremony” (Exhibit #1). She
explained that the LEAD360 Challenge, an initiative of the Jefferson Awards Foundation, is one (1)
of the largest youth service contests in America. The Challenge taps into the energy and idealism
of young people, encouraging and facilitating them to share their stories of service with millions.
Ms. Wade stated that this was the 5th year Dover had participated in LEAD360 and expressed the
Foundation’s happiness to have an active community once again.
Mayor Christiansen, Ms. Wade, Ms. Pastolove, and Ms. Fidance presented awards, as follows:
Central Middle School Senators in Action Club
The Senators in Action Club at Central Middle School has made a commitment to
helping the less fortunate in their community, with special attention given to those
with Alzheimer's and hospitalized veterans. They meet on Friday afternoons to work
together to make a positive difference in the lives of others. They have completed
many different projects over the school year.
Dover High School Communities in Schools
The Communities in Schools group at Dover High School will complete a service
learning course aimed at teaching students the value of community service as a way
to learn, and as a way to help their communities. The course will also earn students
college credit to help them continue their education. This year they will focus on
global hunger and food insecurities, partnering with the Food Bank of Delaware to
give students hands-on experience.
Page 9
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 3
Dover High School Interact Club
The Dover High School Interact Club is hosting an event called Little Dresses for
Haiti, with a goal to sew 50-100 dresses for children in Haiti. The dresses will be
created from donated new pillowcases, and handmade by students in the club.
Dover High School JROTC and AFJROTC
The Dover High School JROTC and AFJROTC cadets volunteered at the Monster
Mash Marathon last October, which benefits the Wounded Warriors Project. The
cadets assisted in providing runners with water, Gatorade, and gel energy packs.
They also organized a toy drive for Toys for Tots last December. The exceeded their
goal of collecting 300 toys, collecting 404 toys for underprivileged children in Dover
and Kent County.
Holy Cross School Knitting Club - Mayor's Top Project
The Holy Cross Knitting Club, founded by Raegan Garnsey and Montana Johansen,
is a group of students in grades 1-8 who meet twice a month to knit hats for people,
from newborn to adult. The club has donated over 324 hats both domestically and
internationally.
PRESENTATION - 2014 ANNUAL REPORT - ROBBINS HOSE COMPANY (DOVER
FIRE)
Fire Chief Mark Hall reviewed the Dover Fire Department 2014 Annual Report. On behalf of the
Fire Department, Chief Hall expressed appreciation for the leadership of Chief Matthew Carey in
2014. Chief Hall informed members that he had 13 years of service to the citizens of Dover, noting
that he was an elite member of the Fire Department, held the office of Deputy Fire Chief last year,
served as assistant chief for two (2) years and captain for two (2) years prior to that.
Chief Hall reviewed the Run Totals for 2014, noting that the report mistakenly indicated 2015. He
informed members that there were 451 false alarms or false calls, which include faulty activations,
malicious and accidental alerts; 197 good intent calls, including investigations of smoke or odor or
runs cancelled prior to the department responding; 163 actual fires, including buildings, houses,
cooking fires, vehicles, brush or grass; 144 service calls, which consist of water leaks, floods, and
assists to the police or other agencies; 121 hazardous conditions with no fire, including fuel spill,
gas leak, and electrical hazardous. Chief Hall stated that the Dover Fire Department also had 97
rescue and emergency medical runs, which are motor vehicle collisions (MVCs) with entrapment
and medical assist. He advised that the Dover Fire Department is unique in the fact that it is the only
fire department that runs MVCs with entrapment. Chief Hall explained that the department does not
go to every accident, noting that if they went to every injury accident, run totals would be more than
5,000 and the department is 100% volunteer. He stated that the department also had 4 severe
weather calls or natural disasters and the run total was 1,191 for 2014.
Chief Hall stated that the City of Dover helped the Dover Fire Department purchase 55 of the latest
designed air packs, the MSAG1, which they anticipated receiving within the next 20 days. He noted
that the new air packs had not hit the market yet, the Baltimore City Fire Department was scheduled
to receive them first; however, that had been delayed and it appeared as though the Dover Fire
Department would be the first to receive them. Chief Hall reviewed the features of the new air packs
and the G1 Mask-Mounted Regulator.
Page 10
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 4
Chief Hall stated that the City of Dover also provided the funding for 65 new Motorola APX 6000
portable radios for use on person and 24 APX 6500/7500 mobile radios for inside the apparatus. He
stated that some of the mobile radios are the 7500, which are encrypted, allow the firefighters to
communicate with the Dover Police Department, State of Delaware agencies, and four (4) counties
in Maryland, and are ready to support new technology and data applications. Chief Hall expressed
hope that the newly procured Knox Boxes would tie into the radio systems as well. He stated that
the APX 6000XE is the ideal communication solution for first responders working in extreme
environments. Chief Hall noted that the new radios have enlarged knobs which help tremendously
with interior operations, since firefighters wear big, bulky gloves. He thanked the City of Dover for
purchasing the radios and the air packs, noting that the radios were great.
Chief Hall reviewed several notable incidents that occurred during 2014. He also noted community
events that the department participated in, including the signing of House Bill 233, the “School
Safety Act;” a training exercise for a congressional delegation at the Delaware State Fire School,
which 12 Dover firefighters participated in; and the Fordham Brewery R2HOP2, where the
department provided Emergency Medical Service (EMS) support and set Ladder 2 up as an aerial
display in an effort to recruit new members and provide community outreach.
Chief Hall informed members that the firefighter of the year for 2014 was Mike O'Connor III, noting
that he was typically the first responder on the fire truck for all of the notable incidents of 2014. He
stated that Mr. O’Connor is always available to help, is a great fireman and is now serving as a
captain in the department. Chief Hall also acknowledged the Top-10 responders for 2014,
explaining that they responded to between 320 to 600 of the 1,191 calls.
Mr. Hutchison thanked Chief Hall, noting that he could stand proud of the report he provided. He
stated that it was absolutely amazing that it was all done by volunteers and, on behalf of City Council
and the citizens of Dover, thanked Chief Hall and all of the volunteers for a job well done.
Mr. Bonar reminded members that the Dover Fire Department was the only state capital in the
United States with a volunteer fire department, noting that the volunteer fire service in the State of
Delaware is second to none, and has been innovative, involved, and deeply responsive to citizen
needs throughout the State. Mr. Bonar expressed his thanks to the men and women who volunteer
with the Dover Fire Department.
Mr. Hare moved for acceptance of the Dover Fire Department 2014 Annual Report, seconded
by Mr. Hutchison and unanimously carried.
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE REPORT - APRIL 13, 2015
The Parks, Recreation, and Community Enhancement Committee met on April
13, 2015 with Chairman Dixon presiding.
Presentation - Martin Luther King Jr. Educational Community Center
Dr. Garcia (Gus) Walker stated that he serves on the Martin Luther King Jr.
Educational Community Center Committee and it was hoped that this community
center would be located in Dover in the near future. He introduced the other
Page 11
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 5
members of the committee, including Dr. Ira Roach III and Dr. Derone Daniels, who
are involved with a General Educational Development (GED) diploma program for
youth in the Dover area, Ms. Anne Smith, who deals in hospitality and who set up
the hospitality curriculum at Delaware State University, Mr. Alex Cropper, licensed
drug and alcohol counselor, and Mr. Bobby Wilson. Dr. Walker stated that he was
a retired educator and counselor.
Dr. Walker stated that City Council was not being asked for money but for a facility
that could accommodate the Community Center. He reviewed a presentation entitled,
“MLK Educational Community Center” and explained that between 7,000 to 9,000
individuals were currently incarcerated in the State of Delaware, approximately 44%
of them do not have a high school diploma or GED, and approximately 1,500 to
2,000 individuals are on probation or parole at one time or another. Dr. Walker
stated that these individuals are not allowed to use facilities such as the Polytech
Adult Education Center because the Center does not accept felons or sex crime
offenders and advised members that the proposed program would serve individuals
in Kent County who are “down and out” and “fall through the cracks” by providing
GED high school diplomas.
Dr. Walker reviewed the mission goals of the program, including human service,
workforce development/job training, substance/mental health programs, food
programs, emergency shelter and promoting a safe and sanitary community
environment for all ages and cultures, and crisis prevention. He indicated that
another goal was to partner with the City, including the Mayor, City Council, and
those involved in the Downtown Dover Development District; State government;
local police departments; local non-profit organizations; and schools for fundraising,
community building, community service, and education. Dr. Walker advised
members that the goal of fostering community could be met by hosting holiday
meals, town meetings, family gatherings, and individual recognition and memorial
events in partnership with the clergy and the Dover Panhellenic Council. He noted
that the Dover Panhellenic Council consists of nine (9) Greek-letter sororities and
fraternities made up of 400 or 500 college-educated individuals who are required to
do community service. He stated that many people in various parts of town have the
same ideals and he expressed the desire to have everyone “put their heads together”
to work toward saving communities. Dr. Walker stated that the MLK Educational
Center Committee already met with the Interdenominational Ministerial Alliance
(IMA) and is forming a partnership with them to coordinate efforts. Dr. Walker
stated that sustainability was a major goal of the organization and expressed their
desire to use the mission statement and goals to achieve their financial needs and
future aims to provide care, restoration, and improvement of the facilities; support
staff development; increase volunteer engagement; and energize broad participation.
Mr. Hutchison thanked Dr. Walker for the presentation and, based on
Mr. Hutchison’s 25 years in law enforcement, confirmed the serious need in the City
and Kent County to address the concerns raised; however, he questioned where
funding would come from to support the center. Responding, Dr. Walker stated that
Page 12
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 6
funding would come from State and local grant funds, and start-up funding would
basically be coming from personal interests. He indicated that this is a 501(c)(3)
organization and that grant writers were currently writing the grants for these types
of programs.
In response to Mr. Hutchison regarding the number of people that the facility could
handle at one (1) time, Dr. Walker stated that Mr. Cropper had estimated that over
125 individuals could be served.
Responding to Mr. Hutchison about operating hours, Dr. Walker stated that the office
portion of the organization would be a nine (9) to five (5) operation; however, they
would be on call 24 hours per day.
Mr. Hutchison questioned whether the organization had reached out to the upper
management of State government to see whether there was an opportunity for
partnership, so that individuals could be assigned to the MLK Education Community
Center instead of being incarcerated. Responding, Dr. Walker indicated that he had
not spoken with upper management; however, he had contacted the Department of
Probation and Parole, which would be the gatekeeper for sending these individuals
to be serviced. Dr. Walker confirmed that the focus of the group was mainly on
those coming out of incarceration, stating that there are organizations that deal with
kids aged six (6) to 18 to try to keep them out of the prison system, educate them, and
let them matriculate at different universities and communities; however, those aged
16 through 40 plus are “lost.” He advised members that those without a high school
diploma can be seen walking the streets and “sometimes coming through our door
at night.” Dr. Walker stated that many of these individuals have become
disenchanted with life and their self-esteem has declined due to many fallbacks. He
felt that this population should not be forgotten because we live in gated
communities, do our nine (9) to five (5) jobs, pay rent and taxes, and stay away from
these areas, noting that the problem is getting larger and larger.
In response to Mrs. Horsey regarding the ideal location of the building, Dr. Walker
indicated that one (1) of the main locations discussed was the former Dover Public
Library; however, he noted that there were several vacant areas. He indicated that
they were “willing to just take a building to get going” and hoped to return in two (2)
years and show success. He stated that, “you might even give us this building,”
explaining there was a need for a brick and mortar building to handle the group
counseling sessions, which would be held five (5) days per week and some
weekends. He noted that transportation would be included in the program for
individuals who need it.
Mr. Hutchison stated, for the record, that he absolutely embraced the concept being
discussed; however, he was not happy about a downtown location. He stated that the
City was embarking upon a wonderful opportunity, with commitment from the
Governor's Office and Kent County Levy Court to attack the issues and concerns in
Page 13
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 7
downtown Dover, and felt that this area could not be rehabilitated if more issues and
concerns were brought there. He stated that he would welcome the opportunity to
work with the committee on a location.
Responding to Mr. Anderson regarding when the program would begin once a
location was found, Dr. Walker stated that the program would be able to start July
1, 2015, without or without a facility, noting that it might be in his kitchen.
Mr. Anderson also offered to help with a location.
Dr. Walker stated that Dr. Daniels runs a faith-based GED program with a 100%
graduation rate and there are great substance abuse counselors doing their job every
day. He advised members that there are people with great hearts out there working
right now, but support is needed. He expressed the need to “let our pockets face up
with our hearts” to sustain this program.
In response to Dr. Walker’s request to meet and talk about facilities available in the
Dover area, Mr. Hutchison introduced Mr. Bill Neaton, Economic Development
Manager, stating that Mr. Neaton had a list of available buildings and could provide
guidance. He expressed the need to identify what size building was needed and focus
on making sure that the location would fit the needs.
In response to Dr. Walker regarding the cost to the organization for the use of the
building, Mr. Neaton stated that this would have to be determined by the owner of
the building.
Mr. Hutchison reiterated the need for the program and thanked the Committee for its
presentation.
Mr. Anderson thanked Dr. Walker and the team for this “great” proposal, stating that
it is desperately needed. He indicated that there are many services in the City, but
there are gaps in getting the services to the location of those who need them, and it
is essential to solve this problem. Mr. Anderson stated that one (1) of the best ways
to get people off the streets is to have a place where they can be productive, which
would be very positive and add value to the City. He hoped that the location selected
would be accessible to those most likely to be in need of it, and he reiterated the need
for transportation.
Mr. Dixon stated his appreciation for all the hard work of the Committee and
encouraged them to contact him if he could be of service. He noted the need for help
in the City and indicated that he wanted to see the program work.
Benchmarks Established for the Economic Development Office
Mr. Bill Neaton, Economic Development Manager, stated that the benchmarks for
the Economic Development Office (EDO) are presented semi-annually and would be
reviewed in two (2) segments: 1) the Downtown Dover Partnership (DDP) and
2) City-wide economic development.
Page 14
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 8
Mr. Ed Perez, Downtown Coordinator, reviewed the benchmarks for the DDP. He
indicated that the DDP had led or organized 26 events in downtown Dover year to
date, with seven (7) additional events scheduled, and were on target to meet their
goal of 30. The scheduled events included First Fridays in April, May and June.
Staff was also collaborating on Artsyfest, a new event scheduled in April, and
helping with the Restoring Central Dover Community Fair.
In regard to the objective to set and reach an annual fundraising goal for the DDP,
Mr. Perez stated that the DDP’s Organization Committee was being restructured and
would now focus on grant writing. He noted that there would be ongoing research
to pursue grants that will apply specifically to the type of work that the DDP does to
help supplement some its activities.
In regard to monitoring the satisfaction of downtown merchants and business owners,
Mr. Perez stated that the DDP was on schedule to conduct this survey in May.
In reference to monitoring businesses opened in the downtown target area, Mr. Perez
stated that the projections for 2014-2015 were for six (6) new businesses and a net
of four (4) new businesses to open in the Downtown Dover target area. Mr. Perez
advised members that five (5) new businesses had been opened, with a current net
gain of four (4) new businesses, so the DDP was on target to meet that goal.
In reference to working with property owners and entrepreneurs to fill vacant
commercial spaces on Loockerman Street with businesses, Mr. Perez stated that four
(4) vacant spaces had been filled: Dinos & Darlings, 9 West Loockerman Street;
Pure Luxury Salon, 32 West Loockerman Street, Suite 109; Celebrity Style Vintage
Boutique, 32 West Loockerman Street, Suite 101-B; and Artsy Fartsy crafts, 32 West
Loockerman Street, Suite 101-D.
Mr. Anderson inquired about the response from downtown businesses and merchants
to some of the new initiatives in the Downtown Development District. Responding,
Mr. Neaton explained that five (5) public workshops had been held over the last
month and a half, and meetings had been held with realtors and bankers. He stated
that a meeting was held specifically with downtown merchants to explain the
Downtown Development District Program and was very successful, with over 30
merchants attending. Mr. Neaton advised members that Mr. Kirby Hudson, the
City’s new Assistant City Manager, recently completed a walking tour of the
downtown area with Mr. Perez and they determined that, regardless of all of the
related advertising and meetings, some merchants had not been exposed to the
program. A follow-up meeting was scheduled for April 30, 2015 at the Bayard Plaza
and invitations would be hand delivered to merchants on the west side of town and
the areas outside of Loockerman Street. Mr. Neaton stated that the downtown
merchants had embraced the program and several meetings had been held with
developers from outside of the area who are looking to bring large development into
the downtown area. Mr. Neaton stated that the EDO is very excited about the
potential for the Downtown Development District and asked for support from the
Committee and Council to make sure that funding for the program moves forward
Page 15
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 9
into the State’s next fiscal year. He indicated some concern because the $7M that
was allocated Statewide in FY 15 for large Downtown Development District projects
had been spoken for, and he expressed the desire to make sure that the State
continues the program into FY 16.
Mr. Anderson stated that he was glad to hear of the good response and he felt that the
City would be “in great shape” next year because its program is superior to any other
in the State.
Mr. Neaton advised members that the Planning Office and the EDO had invited
anyone who was interested to come in to discuss the program individually. The EDO
met last week with five (5) different individuals, and the Planning Office met with
a similar number of interested individuals.
In response to Mr. Anderson regarding whether the Delaware Economic
Development Office (DEDO) had helped or cooperated on this program, Mr. Neaton
explained that the program is administered through the Delaware State Housing
Authority (DSHA) and is not a DEDO interoffice program. Having said that, he
indicated that DEDO is always very supportive of these programs.
Mr. Anderson questioned if DEDO was helpful in getting related out-of-state
businesses directed to the City. Responding, Mr. Neaton stated that they had not
been; however, Mr. Kirby Hudson, Assistant City Manager, had been instrumental
in bringing some outside developers into the area.
In response to Mr. Hutchison regarding whether anyone had actually applied for
funding, Mr. Neaton stated that they had. Mr. Neaton explained that the way the
program works is that applications are submitted for large projects and funds are then
reserved. Two (2) applications had been received for large project funds with a
$250,000 threshold. For smaller projects, under $250,000, project work is completed
and then an application is submitted to the DSHA for reimbursement, which is to
occur within 60 days after certification.
Mr. Hutchison questioned if applicants know for sure that they will receive
reimbursement once a project is completed. Responding, Mr. Neaton stated that
applicants are asked to meet with Planning Department or EDO staff before moving
forward with a project to make sure that they meet all the qualifications, that the
project is in the district, that it fits the plan, and that it is something that staff can
assure them that they will be reimbursed for at the end of the project.
Responding to Mr. Neaton, Mrs. Ann Marie Townshend, Director of Planning and
Community Development, stated that staff would be receiving updates from the
DSHA on the amount of funds still available; however, at this point no applications
had been received for small project funds, so all of that money was still available.
She stated that there would be a problem if many projects finish at the same time and
Page 16
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 10
the demand comes all at one (1) time. She assured members that staff was keeping
close tabs on this and making sure to communicate to inquirers that they should get
their applications in as quickly as possible.
In response to Mr. Hutchison regarding the threshold for smaller projects,
Mrs. Townshend reiterated that the smaller projects discussed would be below a
$250,000 investment and would be eligible to receive a State grant up to $45,000.
Mr. Dixon stated the importance of monitoring projects and Mr. Neaton indicated
that this was very important to staff.
In regard to City-wide economic development, Mr. Neaton referenced the Strategic
Objectives for Fiscal year 2014-2015, stating that one (1) of the objectives for the
EDO and the City is to complete infrastructure construction at the Garrison Oak
Technology Park (GOTP). He stated that although the report indicated that the
infrastructure was about 35% complete, a construction update received on
April 10, 2015 revealed that the portion being constructed by A-Del Construction
Company, including the roadway, sewers, sanitary sewer, water and storm water, was
50% to 70% complete. The eastern portion of the road was now complete, the base
coat in the entrance and back to the Garrison Energy Center (GEC) was paved, and
the majority of it had sidewalks and curbing. Mr. Neaton indicated that this had
allowed for the start of infrastructure improvements to the western portion of the
GOTP, which was important because traffic was now being funneled into the eastern
portion of the park so that the water, storm water, and sewer lines can be laid, and the
Uzin Utz manufacturing facility was very close to being completed. Mr. Neaton
suggested that members take a run to White Oak Road to view the site. He stated
that Mr. Philip Utz advised him that they expect to start production at the end of May
and this would require infrastructure to be in place, including the roadway and natural
gas line to that location. Mr. Neaton indicated that a six (6) week timeline had been
set with A-Del Construction, and the City expected them to comply. He advised
members that George & Lynch, Inc., one (1) of the other two (2) contractors at the
site, was working on the pump station, which was almost complete, had been hooked
into the GEC, and was being utilized for their discharge. Mr. Neaton stated that the
other major project at the GOTP is a 1.5M gallon water tower, which was
approximately 40% to 50% complete. Although this project is behind its original
schedule, it is ahead of the revised schedule that had been worked out.
Mr. Neaton stated that he had been tasked with bringing two (2) new businesses to
the GOTP, but noted that he plans to bring 12 new businesses since the City has 12
additional lots there. He indicated that he had met with one (1) prospect several
times over the last six (6) months, and last week they informed him they would be
putting together a proposal for an additional parcel of land at the GOTP. Mr. Neaton
informed members that this is a technology company and, once their identity can be
announced, he felt members would be very pleased, noting that a lot of things still
have to come into place for this project to occur.
Page 17
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 11
Mr. Neaton stated that an hour prior to the meeting he was speaking with an investor
from Europe who hopes to come at that end of the month to look at several parcels
at the GOTP. This would be a large employer. He indicated that staff had been
working with this party for well over a year and were excited that they are coming to
look at the infrastructure and the parcel.
Mr. Neaton advised members that Mr. Alan Levin, Secretary, DEDO, had been to the
GOTP several weeks ago and Mr. Levin had indicated that he was pleasantly
surprised at the investment the City had made in the site. Mr. Neaton stated that he
was sure that the City would get some support from the State and that the State would
send some businesses here rather than to New Castle County.
Mr. Neaton informed members that the GEC was beginning to ramp up and was
doing some testing, which would cause some strange noises over the next few weeks.
The City is starting to supply them with water and taking their discharge. In six (6)
weeks they will be hooked into the grid and be a fully functioning power plant.
In relation to City-wide economic development, Mr. Neaton stated that a number of
new businesses had come into town, including Urban Furniture, located in the former
Metro grocery store that had been vacant for six (6) years, and Airbase Carpet was
also occupying a portion of this building. Mr. Neaton explained that staff had been
working very closely with the owners of the former Walmart building, who have
submitted a very aggressive plan for that area with a lot of new retail businesses and
some restaurant pad sites.
Mr. Neaton indicated that staff had met with the developers and owners of the Kmart
building, which is a company out of Cleveland, Ohio. He indicated that they have
“really nice plans” for that facility that will put a couple of tenants into the building
and it was hoped that these plans would be submitted in the near future.
Mr. Neaton indicated that Produce Junction would be going into the old TigerDirect
building near PetSmart, a building that has had numerous businesses followed by
vacancies. He advised members that Produce Junction was a very well established
company with 19 locations on the east coast and was the largest independent
purchaser of bananas out of the Port of Wilmington. He stated that this is a big
company and he looked forward to having them here.
Mr. Neaton stated that construction was occurring at the former Chicago Uno and
former Dover Litho sites and a couple of grand openings would be happening in
those buildings over the next several months.
In response to Mr. Hutchison regarding the Playtex site, Mr. Neaton stated that
Playtex was expanding their facility and remodeling the interior of their building and
the Planning Department, City Manager’s Office, Mayor’s Office, and EDO had been
working with them regularly. Mr. Neaton advised that the City had received a
Page 18
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 12
proposal from an engineering company for enhancements to the Clara Street
entrance. Responding to Mr. Hutchison regarding the timetable of the project,
Mr. Neaton stated that the expected completion date was in 2017.
Responding to Mr. Anderson, Mr. Neaton stated that there had been good
cooperation from the Delaware Department of Transportation (DelDOT) on the
Playtex project. He stated that DelDOT had been working very closely with the
Planning Department and had been very responsive to staff’s requests, noting that the
State wants this project to work.
Mr. Hutchison expressed thanks for staff’s commitment and focus. He stated that
economic development takes a partnership between the City, State and County in
order to make all these things work and a lot of energy to make things happen. He
felt that the City of Dover was on the cutting edge right now and stated that the City
had the opportunity and responsibility to make sure the right steps are being taken in
moving forward.
Update - Recreation Needs Assessment
Mrs. Ann Marie Townshend, Director of Planning and Community Development,
stated that she was working on pulling together information related to the Recreation
Needs Assessment and that she hoped to be able to put time into the project during
the coming week.
Review of Youth Advisory Committee Membership Applications
Mr. Anderson stated that applications were still be collected for the Youth Advisory
Committee (YAC). He indicated that he had communicated recently with the
principal of Dover High School regarding this. He was unsure if the Parks and
Recreation Department had received any applications; however, he stated that enough
applications had been received to have a strong committee and asked that these
applicants be considered. Mr. Anderson recommended that the individual who
submitted the third application be contacted and asked to fill it out properly and
resubmit it for the next meeting, because part of the point of the YAC is to help
people learn how to do things in a professional way.
Mr. Hutchison inquired if Councilman Anderson was reaching out to any college
students in this regard. Responding, Mr. Anderson stated that the actual members of
the Committee will come essentially from eighth through twelfth grades, due to the
way the resolution was originally drafted. He indicated that subcommittee members
and volunteers could be people from all over the community, including college
students, and several college students are actually engaged with this.
Mr. Hutchison stated that he had the opportunity to read the applications and they
each bring something a little different to the table.
Page 19
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 13
In response to Mr. Hutchison regarding the number of members that he would like
to see, Mr. Anderson stated that he envisioned nine (9) members. He indicated that
the National Council on Life and Labor Research (NCALL) and Dover High School
had some applications that Mr. Anderson had not yet received, so there would be
more coming and may be reviewed at the next Committee meeting. He felt there
were enough to get a strong YAC and a strong quorum and hoped that more members
could be added as more applications are completed.
Mrs. Horsey stated, in going over the applications fairly quickly, she felt that there
were many applicants that had given very strong positive answers and looked like
they would be good future leaders, and this is a good way for them to start.
Mr. Dixon stated that the YAC was one (1) of the dreams of the late Councilwoman
Sophia Russell and that the City would continue to work hard to keep this alive and
moving.
The Committee recommended acceptance of the applications as presented (as on file
in the Office of the City Clerk), with the exception of the application that was not
filled out.
Mr. Anderson stated that he abstained from voting because his daughter was an
applicant.
During their meeting held on November 10, 2014, members considered the First
State National Monument - Wayside Planning for The Green. Members
recommended approval of proposed wayside exhibits for the First State National
Monument, stipulating that there be outreach to the members of the Friends of Old
Dover, and this recommendation was approved by City Council during their meeting
held on November 24, 2014.
During the Committee meeting held on April 13, 2015, Mrs. Horsey provided
members with the finished text for the wayside exhibits, stating her understanding
that the waysides would be erected before Dover Days. She indicated that she had
already sent this to the Mayor, and Mr. Anderson suggested that she email this
information to the City Clerk’s Office for distribution to Council and Mr. Caldwell.
By consent agenda, Mr. Hare moved for approval of the Committee's recommendation,
seconded by Mr. Slavin and carried by a unanimous roll call vote.
By consent agenda, Mr. Hare moved for acceptance of the Parks, Recreation, and Community
Enhancement Committee Report, seconded by Mr. Slavin and carried by a unanimous roll call
vote.
Page 20
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 14
QUARTERLY REVENUE REPORT
Members were provided the Quarterly Revenue Report as of March 2015.
By consent agenda, Mr. Hare moved for acceptance of the Quarterly Revenue Report as of
March 2015, seconded by Mr. Slavin and carried by a unanimous roll call vote.
SEMI-ANNUAL INSPECTION BY CITY MANAGER - ROBBINS HOSE COMPANY
In accordance with Chapter 46 - Fire Prevention and Protection, Article II - Fire Department,
Division 1 - Generally, Section 46-43 - Semiannual Inspections, of the City Code, the City Manager,
Mr. Scott D. Koenig, met with the Fire Chief to discuss fire company issues. Mr. Koenig submitted
a memorandum outlining the items discussed and noted that the Robbins Hose Company continued
to provide an outstanding level of service to the City of Dover and the unincorporated areas of the
fire district.
By consent agenda, Mr. Hare moved for acceptance of the report of the Semi-Annual Robbins
Hose Company Inspection, as submitted by the City Manager, seconded by Mr. Slavin and
carried by a unanimous roll call vote.
EVALUATION OF BIDS - FY 15 STREET AND ALLEY PROGRAM
Mr. Scott Koenig, City Manager, informed members that in concurrence with the City of Dover's
Capital Investments Plan, staff proposed to rehabilitate various pavement and concrete sections
throughout the City of Dover, as well as complete some asphalt and concrete work for the Inner City
Cultural League during Fiscal Year 2015. He stated that in preparing for the annual City of Dover
street program, staff prepared a bid package for various locations associated with rights-of-way
owned by the City of Dover.
Mr. Koenig noted that there were approximately 10 locations on the current, tentative work schedule.
The total length of scheduled street repaving overlaying is approximately 4,902 linear feet or 0.928
miles. In addition to repaving, this project also includes replacing approximately 914 linear feet of
curb, 735 square feet of driveway apron, 2,930 square feet of sidewalk and 730 square yards of
various patch work. It is estimated that the Inner City Cultural League will require an additional
3,300 square feet of pavement, 325 linear feet of curb, 1,400 square feet of sidewalk, and 1 junction
box to be installed.
Mr. Koenig stated that five (5) bids were received on April 8, 2015, with prices ranging from
approximately $370,000 to $588,000.
Staff recommended awarding a unit price contract, based upon Bid #15-0030PW, for the FY 2015
Street and Alley Program to Sam's Construction LLC based on the With Prevailing Wage (where
applicable) unit prices for each work item submitted. Work will be performed in strict accordance
to the Bid Specifications.
Mr. Koenig advised that the proposal included a draft schedule of locations; however, as additional
funding becomes available, through Community Transportation funds or projects coming in lower
than anticipated, street locations will be added to the scope of work up to the amount authorized by
the City’s purchasing policy.
Page 21
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 15
Responding to Mrs. Williams, Mr. Koenig explained that the large dichotomy between the prices
was typically driven by the work schedules of the various contractors. In this case, he suggested that
the difference was due to asphalt prices, noting that some people have direct supply, while others pay
a higher markup.
Mrs. Williams moved for approval of staff’s recommendation to award a unit price
contract, based upon Bid #15-0030PW, for the FY 2015 Street and Alley Program to Sam's
Construction, LLC based on the With Prevailing Wage (where applicable) unit prices for each
work item submitted, with work to be performed in strict accordance to the Bid Specifications.
The motion was seconded by Mr. Dixon and carried by a unanimous roll call vote.
2015 MUNICIPAL ELECTION RESULTS
Mrs. Traci McDowell, City Clerk, reported the results of the 2015 Municipal Election held on
April 21, 2015, as certified by the Election Board, as follows:
MAYOR
Carleton E. Carey, Sr. 622 (29.40%)
Robin R. Christiansen 1,390 (65.69%)
George J. Gaudioso 104 (4.91%)
The Total Votes Cast for Mayor were 2,116 which is 9.27% of 22,837 Total Registered Voters.
FOR FIRST DISTRICT CITY COUNCIL
James E. Hosfelt, Jr. 485 (59.88%)
Beverly C. Williams 325 (40.12%)
The Total Votes Cast for 1st District City Council were 810 which is 11.99% of 6,753 Total
1st District Registered Voters.
FOR SECOND DISTRICT CITY COUNCIL
Brian E. Lewis (Unopposed)
FOR THIRD DISTRICT CITY COUNCIL -
VACANT COUNCIL SEAT WITH A TERM TO EXPIRE IN MAY 2017
Chevis R. Anderson 172 (29.86%)
Fred A. Neil 404 (70.14%)
The Total Votes Cast for the vacant 3rd District City Council seat were 576 which is 9.88% of 5,829
Total 3rd District Registered Voters.
FOR THIRD DISTRICT CITY COUNCIL
David L. Bonar 241 (41.13%)
Scott W. Cole 345 (58.87%)
The Total Votes Cast for the expiring 3rd District City Council seat were 586 which is 10.05% of
5,829 Total 3rd District Registered Voters.
Page 22
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 16
FOR FOURTH DISTRICT CITY COUNCIL
Wallace R. Dixon 58 (19.66%)
Kenneth G. Roach 84 (28.47%)
Roy Sudler, Jr. 153 (51.86%)
The Total Votes Cast for the 4th District City Council seat were 295 which is 7.43% of 3,972 Total
4th District Registered Voters.
Mr. Slavin moved for approval of the Election Results as reported by the City Clerk. The
motion was seconded by Mr. Dixon and unanimously carried.
Mr. Bonar acknowledged Council-Elect Hosfelt, Lewis, Neil, and Sudler in attendance, thanked
them for putting themselves forward and welcomed them to the Council Chambers. He stated that
they had a big job ahead of them, and was sure that they would join forces with Mr. Scott Koenig,
City Manager, and the other members of Council to do a good job for the City.
FIRST READING OF PROPOSED ORDINANCE #2015-08 - REZONING REQUEST FOR
PROPERTIES LOCATED AT 605, 625, 635, 645, AND 655 BAY ROAD AND 400 HASLET
STREET, OWNED BY BLUE HEN CC, LLC, READ STREET, LLC, AND BLUE HEN APT,
LLC
A request was received to rezone properties located at 605, 625, 635, 645, and 655 Bay Road and
400 Haslet Street, owned by Blue Hen CC, LLC, Read Street, LLC, and Blue Hen Apt, LLC. The
current and proposed zones are as follows:
Address Current and Proposed Zones
605 Bay Road Currently Zoned: RM-2 (Medium Density Residence) Subject to
SWPOZ (Source Water Protection Overlay Zone)
Proposed Zone: SC-2 (Community Shopping Center) and RG-2
(General Residence) Subject to SWPOZ (Source Water Protection
Overlay Zone)
625, 635, 645 Bay Road Currently Zoned: SC-3 (Regional Shopping Center)
Proposed Zone: SC-2 (Community Shopping Center)
655 Bay Road Currently Zoned: SC-3 (Regional Shopping Center)
(12.82 and 23.16 ac) Proposed Zone: SC-2 (Community Shopping Center) and RG-2
(General Residence)
655 Bay Road (0.93 ac) Currently Zoned: SC-3 (Regional Shopping Center)
Proposed Zone: SC-2 (Community Shopping Center)
655 Bay Road (13.2 ac) Currently Zoned: SC-3 (Regional Shopping Center) Subject to
SWPOZ (Source Water Protection Overlay Zone)
Proposed Zone: SC-2 (Community Shopping Center) and RG-2
(General Residence) Subject to SWPOZ (Source Water Protection
Overlay Zone)
655 Bay Road (3.09 ac) Currently Zoned: SC-3 (Regional Shopping Center) Subject to
SWPOZ (Source Water Protection Overlay Zone)
Proposed Zone: SC-2 (Community Shopping Center) Subject to
SWPOZ (Source Water Protection Overlay Zone)
400 Haslet Street Currently Zoned: RM-2 (Medium Density Residence)
Proposed Zone: RG-2 (General Residence)
Page 23
CITY COUNCIL MEETING OF APRIL 27, 2015 PAGE 17
Prior to amending the zoning ordinances and zoning map of the City of Dover, a public hearing is
required.
Mr. Hare moved to refer the request to the Planning Commission on May 18, 2015 and set a public
hearing for June 8, 2015 at 7:30 p.m. The motion was seconded by Mrs. Williams and unanimously
carried.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
Proposed Ordinance #2015-08 as read by the City Clerk, by title only, as follows:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTIES LOCATED
AT 605, 625, 635, 645, AND 655 BAY ROAD AND 400 HASLET STREET
COUNCIL MEMBERS’ ANNOUNCEMENTS
As a reminder, Mr. Bonar announced that a Special Council Meeting would be held on
Monday, May 4, 2015 at 6:00 p.m. in the Council Chambers at City Hall for the swearing in of
Councilman Fred Neil, who was elected to fill the vacancy created by the resignation of
Councilman Lynn. Mr. Bonar stated that the remainder of those elected to Council would be sworn
in at the Annual Council Meeting on Monday, May 11, 2015.
Mr. Anderson thanked military spouses and, noting that May 8, 2015 was Military Spouse
Appreciation Day, encouraged all to show appreciation to a military family member.
Mr. Anderson stated that he was sponsoring a unity breakfast on Monday, May 4, 2015 at 7:30 a.m.
at the Capitol One Diner and invited everyone to attend.
By unanimous consent, the meeting adjourned at 8:09 p.m.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
April 27, 2015, are hereby approved.
ROBIN R. CHRISTIANSEN
MAYOR
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Council-Minutes\2015\04-27-2015.wpd
Exhibits
Exhibit #1 - Presentation - “LEAD360 Awards Ceremony”
Page 39
City of Dover
MAYOR AND COUNCIL
May 11, 2015
Senator/Representative
PO Box 1401
Dover, DE 19903
Dear Senator/Representative:
As you know, the Delaware General Assembly unanimously approved the Downtown Development
District Act in June 2014. Dover is fortunate to be one of the first Downtown Development Districts
designated by Governor Markell. On behalf of the Mayor and City Council of the City of Dover, I
request your support to ensure that meaningful funding is committed to the program in Fiscal Year
2016. The Governor’s recommended Bond Bill includes $7 million for Downtown Development
District grants. The Attorney General’s spending proposal for the Bank of America settlement funds
includes an additional $2 million for Downtown Development District grants and $2 million for
downpayment assistance to incentivize homeownership in these Districts. This funding is critical to
the viability of the 10-year designation.
In Dover, we have worked hard to promote our Downtown Development District program and have
added meaningful incentives, including a series of tax and fee waivers, to help make the economics
of downtown redevelopment favorable to developers. Our designated District includes an 84% rental
housing rate, high crime areas, and high housing vacancy. Our District Plan addresses the needs of
both the residential neighborhoods and the central business district, and we are receiving strong
interest in new activities in both. Through partnerships with NCALL, Central Delaware Habitat for
Humanity, and Milford Housing Development Corporation, we are further leveraging the funds
available with the Strong Neighborhood Housing Fund and other housing resources to provide
affordable homeownership opportunities. We have received great interest from the development
community, and we anticipate a number of exciting projects moving forward in the next 12 to 18
months. We anticipate a significant transformation in the State’s capital city due to the partnerships
in place and the resources being leveraged through the Downtown Development District program.
Continued funding of the Downtown Development District program is vital to the program’s
success. Developers assembling projects now are relying on the availability of the Downtown
Development District grants, along with other incentives, to make their projects feasible. If the
program funding is cut and these projects cannot proceed in the next year, we risk losing the
momentum of the program and the interest of the development community. A cut in funding would
be detrimental to the revitalization of Delaware’s capital city.
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 40
Letter of Support - DDD Funding PAGE 2
Thank you for your support of this important program, which stands to improve the hearts of
Delaware’s cities and towns while leveraging hundreds of millions of dollars in private investment.
_________________________________ _________________________________
MAYOR COUNCIL PRESIDENT
/AMT/mfk
S:\Correspondence\Council Meeting\2015\Letter of Support - DDD Funding.wpd
cc: Mayor and Council
Ann Marie Townshend, Director of Planning and Community Development
Scott Koenig, City Manager
Page 43
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee Meeting was held on April 27, 2015 at
4:00 p.m. with Chairman Hutchison presiding. Members present were Mr. Keller and Mr. Truax.
Mr. Dixon and Mr. Perza were absent. Councilman Anderson (arrived at 4:10 p.m.) and
Mayor Christiansen (departed at 4:15 p.m. and returned at 4:21 p.m.) were also present.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison advised members that, at the request of Mr. Ronald J. Brown, Jr., Item #1,
Presentation - Cure Violence Health Approach, would be removed from the agenda.
Mr. Keller moved for approval of the agenda, as amended, seconded by Mr. Truax and
unanimously carried.
Proposed Ordinance #2015-07 Amending Chapter 46 - Fire Prevention and Protection,
Article IV - Public Occupancies, Section 46-162 - Sprinkler Requirements and Section 46-171 -
Fire Alarm in Place of Assembly
Mr. Timothy Mullaney, Fire Marshal, reviewed the proposed ordinance. He indicated that changes
were proposed in Section 46-162, Sprinkler Requirements, to incorporate National Fire Protection
Association (NFPA) 13 and other requirements regarding the location and type of fire department
connections. He explained that including this information in the Code would make it easier to obtain
this information from a single source.
Mayor Christiansen stated that the Dover Fire Department currently uses a five (5) inch supply line
and uses the building connections on all newly constructed buildings. Noting that some buildings
have 2½-inch national standard connections, he inquired if replacing these connections would be
required or if this would occur only if they are damaged. Responding, Mr. Mullaney stated that an
upgrade would be required for new construction projects for greater than 50% renovations, when
a fire alarm connection would have to be physically relocated because of construction, or if a
sprinkler company informed him that there was a physical problem with the connection that
prevented it from working.
Mayor Christiansen questioned if the Dover Fire Department has the ability to hook up to 2½-inch
connections. Responding, Mr. Mullaney stated that he was aware of only 30 locations using this
type of connection since most buildings had upgraded. He indicated that this was not a problem
because the necessary equipment is available on the trucks and only a little more time and pre-
planning is required. Mr. Mullaney stated that he would not recommend requiring a City-wide
upgrade since this could be a big project that some would be unable to afford.
Mr. Mullaney advised members that the proposed change to Section 46-171, Fire Alarm in Place of
Assembly, would address public mode audible requirements related to shunt trip relays/switches.
He advised members that this is already established in NFPA 72, and this amendment would allow
users to access this information through City Code. Mr. Mullaney stated that the requirement is that
the power source used to amplify live music will shut down at the activation of a fire alarm system.
Mr. Keller moved to recommend approval of Proposed Ordinance #2015-07, seconded by
Mr. Truax and unanimously carried.
Page 44
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF APRIL 27, 2015 PAGE 2
Evaluation of Proposals - Ambulance Service Contract
During the Safety Advisory and Transportation Committee meeting held on March 23, 2015,
members considered the Evaluation of Proposals - Ambulance Service Contract and tabled the
matter until the next meeting of the Safety Advisory and Transportation Committee.
Mr. Scott Koenig, City Manager, referred to his memorandum dated April 22, 2015, regarding
Evaluation of Proposals - Ambulance Service Contract, explaining that the attachments included
answers to members’ questions that were submitted by PrimeCare Medical Transport, LLC, as well
as additional information provided by PrimeCare Medical Transport, LLC and Heartline Ambulance
Service, LLC. Mr. Koenig reminded members that three (3) proposals were received and that
members had agreed that the proposal from Hart to Heart Transportation, LLC was not in
compliance with the Request for Proposals (RFP), and the only proposals that complied were from
PrimeCare and Heartline. He noted that Heartline was an entity that had yet to be created.
Mr. Koenig informed members that, as requested during the Committee meeting of March 23, 2014,
representation of PrimeCare was present.
Mr. Koenig explained that the City had a longstanding contract with PrimeCare to deliver ambulance
services. For a time, the City had received complaints from both Cheswold and Camden-Wyoming
ambulance services for overflow responses that they were making into the City’s service area. He
stated that, at that time, the City had two (2) options, one (1) of which was to pay PrimeCare for
additional ambulance coverage. It was Mr. Koenig’s recollection that the cost would have been
approximately $10,000 per month for PrimeCare to add another shift, and staff was unable to
identify an eight (8) or 12-hour shift with consistent overflow numbers that would address all of the
concerns. The second option was to make donations to Cheswold and Camden-Wyoming
ambulance services to compensate them for the time and effort they were putting into service calls
within the City’s service territory. The City issued donations in FY 13 and FY 14 to these
ambulance providers for their calls inside the City service territory, which amounted to
approximately $15,000 annually.
In regard to the proposal received from Heartline in response to the current RFP, Mr. Koenig
advised members that Heartline would be the creation of a private, for-profit company out of the
existing Camden-Wyoming volunteer fire service and expressed his belief that the ambulance
service that Camden-Wyoming currently provides is a component of their volunteer fire service.
He stated that in the original RFP issued several years ago, responders were asked for five (5) years
of operating experience as a for-profit company, since it was desired that companies demonstrate
the ability to start a service and continue business operation for a five (5) year horizon. Mr. Koenig
noted that typically the expectation is that if a business is going to fail, it will do so within the first
five (5) years. He stated that if members wished to relax this requirement, they could recommend
this to Council; however, it must be understood that there would be a transition period for this new
service and they would have to purchase equipment, create schedules and service components, and
hire staff. Mr. Koenig indicated that Mr. Chris Clough, Employee Supervisor and EMS
Page 45
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF APRIL 27, 2015 PAGE 3
Administrator, Heartline Ambulance Service/Camden-Wyoming Fire Company, had indicated that
they could have their service up and running comfortably by August 1, 2015.
Mr. Koenig advised members that he had not changed his original recommendation to enter into a
contract with PrimeCare Medical Transport, LLC in the amount of $230,000 to provide ambulance
services for a three (3) year period, with a negotiated ending date of June 30, 2018. It was his belief
that there was an option for two (2), one (1) year extensions without having to rebid.
Responding to Mr. Hutchison, Mr. Koenig stated his belief that PrimeCare had been the City’s
provider for approximately 11 years.
Mr. Keller stated that there had been minimal complaints against PrimeCare, noting that there are
always a few complaints with any service, and he expressed his preference for PrimeCare.
Mr. Truax advised members that he had no issue with any of the providers or staff’s
recommendation; however, he expressed concern regarding the process. He felt that the RFP did
not ask some of the proper questions, noting that some of the questions were seven (7) to eight (8)
years old, and suggested that it needed to be reviewed. Mr. Truax did not feel comfortable
recommending a three (3) year contract with a two (2) year extension. He suggested that the
agreement go forward with a recommendation for two (2) years and, within that two (2) year period,
forming a Basic Life Support (BLS) Needs committee to determine exactly what is needed to deliver
the best service to the constituency, every person in the City of Dover, and those passing through
it who will use the ambulance service regardless of who is providing it.
Mr. Truax reiterated that he would like to see a contract go forward with PrimeCare, based on staff’s
recommendation; however, he was concerned about forwarding a recommendation for a five (5) year
contract and not looking at the process. He felt that the process should be evaluated so that the
provider is asked the appropriate questions regarding what the City wants rather than simply
describing what they can provide. Mr. Truax advised members that there is no one on staff who can
develop the proper questions for the City’s RFP. He suggested that someone could be hired to study
this, or that this be done by members of a BLS committee made up of individuals with backgrounds
in dispatch, field care, or hospital care.
Mr. Hutchison stated that the proposal before members was for a three (3) year contract and
reminded members that PrimeCare had already been providing this service for 11 years. He stated
that Mr. Truax had made some valid points in regard to evaluating operations in the future, and
Mr. Hutchison did not have a problem with working with the City Manager and staff to create an
evaluation system. However, he did not feel that this was the issue before members tonight.
Mr. Hutchison did not see the difference between supporting a two (2) year proposal versus a
three (3) year proposal, noting that the City Manager and staff had clearly recommended a three (3)
year proposal.
Mr. Truax stated his belief that the process is tied into the overall bid package. He indicated that
if the agreement were approved for three (3) years, there is no way to know that this matter would
Page 46
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF APRIL 27, 2015 PAGE 4
be reviewed or that the agreement would work. He felt that it would be proper to make a motion in
favor of a two (2) year agreement with a component that a BLS committee would be formed to
review this matter. Mr. Truax stated that this was his opinion and each Committee member should
develop their own opinion.
Mr. Hutchison requested Mr. Koenig’s opinion on the concept of developing an evaluation system
and establishing a board to address Mr. Truax’s concerns. Responding, Mr. Koenig stated that he
had no concerns with appointing a future BLS committee. He advised members that he had already
included a study related to police staffing, fire dispatch, and ambulance service in an FY 16 draft
budget for Council’s consideration in a few weeks. Although this study currently did not include
the fine details of BLS, he felt that this could be the starting point for discussing whether the City
should pursue additional BLS services. Mr. Koenig stated that former Councilman Eugene Ruane
had asked staff to create an annexation model, and much time was spent talking about the services
that would be impacted by annexation and development, including police, fire, and streets.
Ambulance calls were not discussed; however, Mr. Koenig noted that the 10-year trend of
ambulance calls had crept up significantly, and the last three (3) years had leveled off.
Mr. Truax questioned who would sit on that committee, how it would be formed, and whether it
would be a subcommittee to the Safety Advisory and Transportation Committee.
Responding, Mr. Hutchison stated that it could be made a priority to move forward with this matter
and that the details could be worked out.
Mr. Truax suggested that the Committee recommend a three (3) year agreement and that, in that
three (3) year period, a BLS needs committee would be formed as a subcommittee to the Safety
Advisory and Transportation Committee. This would place the intent for a review of this matter on
the record and would allow enough time to review, study, and come up with a reasonable overview
of BLS needs.
In response to Mr. Hutchison regarding the recommended composition of the subcommittee,
Mr. Truax suggested that it be made up representatives from dispatch; field care, including EMTs;
and someone from hospital care, including a nurse or doctor, and stated that determining who would
sit on the subcommittee would be part of the overall process.
In response to Mr. Hutchison regarding whether this is being done elsewhere in Delaware, Mr.
Truax stated that he was unsure. To his knowledge, there are only two (2) jurisdictions using private
carriers for 911 transport, the City of Wilmington, which uses St. Francis, and the City of Dover.
Mr. Koenig reminded members that the RFP was for a three (3) year contract with two (2), one (1)
year extensions if the City so chooses.
In response to Mr. Hutchison, Mr. Koenig confirmed that the City would continue to have the same
agreement with the Camden-Wyoming and Cheswold fire services for reimbursement.
Page 47
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF APRIL 27, 2015 PAGE 5
Responding to Mr. Keller, Mr. Koenig confirmed that the questions previously asked by members
were answered in PrimeCare’s letter of response. Mr. Koenig explained that some of the more
detailed questions that Mr. Truax had identified were not in the RFP, either because they are new
things or because they are service levels that Mr. Truax would like to see enacted. The RFP was to
provide the current minimum level of service that is required.
Mr. Keller moved to recommend authorizing the City Manager to enter into a contract with
PrimeCare Medical Transport, LLC in the amount of $230,000 to provide ambulance services
to the City of Dover for a three (3) year period, with a negotiated ending date of June 30, 2018,
as recommended by staff. The motion was seconded by Mr. Truax and carried by a vote of
two (2) yes (Keller and Hutchison) and one (1) no (Truax).
Mr. Truax moved to recommend placing a discussion of the feasibility of creating a committee
to study the Basic Life Safety (BLS) needs for the City of Dover on the agenda for the next
Safety Advisory and Transportation Committee meeting, seconded by Mr. Keller and
unanimously carried.
Briefing on Delaware Department of Transportation (DelDOT) Projects
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that updates were requested from the Delaware Department of Transportation (DelDOT) for projects
that were put forward as transportation priorities in regard to the Capital Transportation Plan (CTP).
She provided updates on these projects, as follows:
Garrison Oak Connector Road
The Garrison Oak Connector Road was listed as one (1) of the top priorities for the City of Dover;
however, no funding for design or construction is included in DelDOT's current CTP. It was
Mrs. Townshend’s belief that the right-of-way was already in place.
College Road Corridor Upgrades
This project is not funded in the current Capital Transportation Plan.
Construction of Sidewalks Within the Walk Zone of the New Dover High School
Mrs. Townshend stated that DelDOT had indicated that the sidewalk project at this location is
complete; however, she noted that members of both the Safety Advisory and Transportation
Committee and the Dover/Kent County Metropolitan Planning Organization (MPO) had recognized
that, although there are sidewalks on the north side of Route 8, there is a large gap on the south side.
Quite a few students had been seen walking in the travel lane or shoulder in that area, or on
residents’ grass, and the City and MPO were discussing this. Mrs. Townshend explained that a
meeting had been scheduled regarding the Kenton Road project with the intent to have some of this
sidewalk area included in an expanded scope for that project. She expressed her belief that sidewalk
construction needs to be prioritized and funded, noting that she and Mr. Scott Koenig, City Manager,
had also discussed this with the Secretary of Transportation.
Route 8/Hazlettville Road Connector
Page 48
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF APRIL 27, 2015 PAGE 6
Mrs. Townshend stated that the Route 8/Hazlettville Road connector is the road located at the west
entrance of Dover High School. She advised members that there is currently no funding for this
project in the CTP.
US Route 13 Sidewalk Construction
There is a small amount of funding in FY 19 for sidewalk design for a portion of US Route 13 from
South Court Street to Loockerman Street. No other money is shown in the CTP.
Crawford Carroll Avenue Extension
Funding for preliminary engineering and design in FY 16 and FY 17 is included in the current CTP.
Funding for right-of-way acquisition is shown in FY 19 and FY 20. There is no funding for
construction in the current CTP. Mrs. Townshend advised members that Delaware State University
(DSU) had acquired the former Sheraton Inn in this area, and currently the only way of travel
between DSU and this new portion of the campus is on Route 13. She explained that from a
pedestrian, bicycle, and vehicle standpoint this project has become more important in the network
in that area.
Kenton Road Corridor Upgrades
Funding for preliminary engineering and design in FY 16 and FY 17 is shown in the current CTP;
therefore, preliminary engineering was expected to begin after July 1, 2015. Mrs. Townshend stated
that she would be attending a meeting to discuss the scope of the project in the next couple of weeks.
Kings Highway/Route 13 Intersection Improvements
This project is not listed in the current CTP.
Loockerman Street/Forest Street Improvements (Roundabout)
Mrs. Townshend stated that this project involves the construction of a roundabout in front of the
Duncan Center in the area where the clock is currently located, noting that five (5) streets converge
in that area. She stated her recollection that this project dates back to the West Side Redevelopment
Plan that was done in 2001, stating that it was previously included in the CTP and then was shelved.
Mrs. Townshend indicated that the project is included in the CTP for preliminary engineering and
design in FY 17 and FY 18. Funding for right-of-way acquisition is shown in FY 19, with funding
for construction shown in FY 20 and FY 21.
Mrs. Townshend stated that staff had discussed looking at the ranking of this streetscape and safety
project in connection with Downtown Development District investments. She indicated that this
project has money associated with it; whereas, most of the other projects on the list do not. She felt
that it is a doable project that ties in well with the Downtown Development District.
Mayor Christiansen questioned where the Loockerman Street/Forest Street roundabout would be
placed. Responding, Mr. Koenig stated that the concept drawings take the small triangle where the
clock is presently located and carve out a small portion of the southeastern corner of the intersection
where there is vacant land. He explained that this may impact some of the land to the north as a
circular right-of-way is carved out. Mr. Koenig stated his recollection that there is a concept plan
that shows that the roundabout can be constructed without removing any buildings, and it would be
Page 49
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF APRIL 27, 2015 PAGE 7
located in the area of the Duncan Center and the George V. Massey Station. He advised members
that the City owns a small piece of property on the other side of Jerusalem Way, formerly Slaughter
Street. Mr. Koenig indicated that the roundabout would be tight but would fit. He explained that
Loockerman Street would then extend out to Route 8 as a kind of parkway with a center median and
landscaping. The proposed Lincoln Park Center/Clarence Street extension road project would be
tied into the roundabout project, as well as the underground installation of all of the overhead
utilities in that area, so there would be both transportation and aesthetic improvements to that
component of Loockerman Street.
In response to Mayor Christiansen, Mr. Koenig confirmed that this project would be part of the
gateway into the City from the west.
In response to Mr. Hutchison, Mr. Koenig agreed to make concept drawings of this project available
to the members.
Mr. Hutchison requested that this item be included on the agenda for the next meeting of the Safety
Advisory and Transportation Committee.
US Route 13 Service Road Corridor
This project has no associated funding in the CTP.
Transportation Improvement District
Mrs. Townshend stated that this large project is not listed in the CTP; however, staff is meeting
monthly with DelDOT in this regard. She advised that staff is working on obtaining numbers to
model various growth scenarios which will allow the development of a fee formula based on
building square footage, rather than each developer having to do a transportation study.
Mrs. Townshend noted that the Transportation Improvement District identifies upgrades throughout
the corridor area to be funded through fees received, which would be more efficient, fair, and a
better use of funds.
In response to Mr. Hutchison regarding the High-Intensity Activated Crosswalk Beacon (HAWK)
signal near Dover High School, Mrs. Townshend stated that the signal was currently functioning and
being used by students. She indicated that it would be a while before another study could be done
to see if the intersection meets warrants for a full traffic light. She explained that the high school
does not keep the east entrance open and that staff tried to articulate to the Capital School District
that as long as there is no traffic going to that entrance, the location will never meet the warrants
because counts are based on traffic coming from different points. Mrs. Townshend indicated that
she had observed cars coming out of Heatherfield and speeding through the intersection when the
pedestrians have the walk sign, which was concerning because they were taking advantage of the
signal in a way that it was not intended. She stated the need to watch the intersection closely
because, at this point, there was no indication from DelDOT that the signal would be changed.
In response to Mr. Hutchison regarding the status of the West Dover Bypass, Mrs. Townshend stated
that it is under construction and on schedule.
Page 50
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF APRIL 27, 2015 PAGE 8
In response to Mr. Keller regarding the construction of sidewalks in the walk zone of Dover High
School, Mrs. Townshend stated that this project was third on the City’s list of transportation
priorities. In regard to right-of-way acquisition, Mrs. Townshend stated it was unknown if there was
enough right-of-way. She advised that this was not in DelDOT’s queue to look at because they
consider this project to be complete since they are looking only at the north side of Route 8.
Mrs. Townshend stated that she had been pushing this project hard through the MPO Technical
Advisory Committee process, and Mr. Rich Vetter, Executive Director of the MPO, proposed the
idea of tying this matter into the Kenton Road project so that it would be on DelDOT’s radar screen.
Mrs. Townshend stated that there was some funding available for the Kenton Road project.
Mr. Keller commented that he had seen kids walking in the road. Mrs. Townshend stated that most
of these students are eligible for bus transportation but are present after school for activities or
sports. She indicated that some districts have a late bus for kids involved in activities; however, the
Capital School District does not. She felt that is a big problem that should be addressed before there
is an injury.
Mr. Truax moved for adjournment, seconded by Mr. Keller and unanimously carried.
Meeting adjourned at 4:42 p.m.
James L. Hutchison, Sr.
Chairman
JLH/TM/js/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2015\04-27-2015 SA&T.wpd
Page 51
LEGISLATIVE, FINANCE AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held on April 27, 2015, at
6:05 p.m. with Chairman Slavin presiding. Members present were Mr. Anderson, Mr. Hare,
Mr. Shevock, and Mr. Sudler. Members of Council present were Mr. Hutchison and
Council President Bonar (arrived at 6:07 p.m. and departed at 6:26 p.m.). Mayor Christiansen was also
present.
AGENDA ADDITIONS/DELETIONS
Mr. Shevock moved for approval of the agenda, seconded by Mr. Hare and unanimously
carried.
Evaluation of Proposal - Investment Banking Custody Services
Mrs. Donna Mitchell, Controller/Treasurer, reviewed the details regarding proposals received for
Investment Banking Custody Services. She advised members that Union Bank’s costs are based on
fees only. TD Bank has no transaction fees and bases their costs on basis points, which are a
percentage of the investment portfolio. Wells Fargo, Wilmington Trust and Key Bank use a
combination of fees and basis points.
Staff recommended awarding the Investment Custody Services to Union Bank for a three (3) year
period to start the date of the contract, which may be renewed or extended for two (2) additional
two (2) year periods by mutual consent and approval of City Council.
Mrs. Mitchell explained that staff’s recommendation was based strictly on price. She informed
members that staff reviewed annual reports and Securities and Exchange Commission (SEC) filings,
and although litigation issues were found with some of the banks, there seemed to be a very low
probability that they would affect these banks. Mrs. Mitchell stated that if Council decided to use
a local bank regardless of the fees, staff recommend TD Bank. Since TD Bank has no transaction
fees and costs are based on basis points, staff felt that this would be the next lowest cost option. She
indicated that all of the banks had good references.
Mrs. Mitchell reiterated that recommendations were based on cost. She advised members that
although WSFS did not bid on this request, WSFS supports the Dover Days Festival. She indicated
that several local banks, including M & T Bank, also perform community service but was unsure
which other banks do so. Mrs. Mitchell advised members that Wilmington Trust, a subsidiary of
M & T Bank, would handle all of the City’s investments under their proposal and would keep the
City’s money in trust and track it on a balance sheet. If there were any litigation issues, the City
would be protected since funds would be kept in the form of a trust.
Mr. Hare questioned why the fees for Union Bank were so much lower than the other proposals.
Responding, Mrs. Mitchell stated that the City currently uses Union Bank and their low fees may
possibly be due to the size of the bank and their volume of business; however, she noted that they
are based in California and banking procedures may be different.
In response to Mr. Hare regarding whether local banks could be asked to reduce their numbers,
Mrs. Mitchell stated that she generally uses the numbers submitted rather than returning to negotiate
with one (1) particular bank. She indicated that she had not contacted any of the banks to determine
if this was their best and final offer.
Page 52
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF APRIL 27, 2015 PAGE 2
Mr. Sudler asked if Mrs. Mitchell would be willing to consider Mr. Hare’s suggestion of negotiating
with the banks and if there was a preferred bank that she thought the City should do business with.
Responding, Mrs. Mitchell stated that all submissions were received from good banks with electronic
capabilities and favorable references and she had no preferences, noting that her recommendation
was solely based on price. She reiterated that some banks help the community and she could
understand if Council felt indebted to obtain this service from a local community bank rather than
a California bank.
In response to Mr. Anderson, Mrs. Mitchell confirmed that Union Bank currently maintained the
City’s shared investment pool. She stated that Wells Fargo services the City’s pension plans, and
she would not recommend Wells Fargo because all of the City’s investments would then be held in
one (1) bank.
Mr. Anderson stated that the City had some flexibility since the cost was less than $25,000. He
questioned if the City would be at risk of violating its Code by negotiating with the banks since the
public proposals had already been served. Responding, Mrs. Mitchell stated that this was sent out
as a Request for Proposals (RFP) rather than a bid and, therefore, could be negotiated.
Mr. Sudler stated that he would like staff to go through the sealed bid process for this service.
Responding, Mrs. Mitchell stated that staff does not typically go through the sealed bid process,
including advertising, for amounts this low; however, staff could do this.
Mr. Hare was unsure if it was necessary to go through the sealed bid process. He suggested that staff
contact the banks that submitted proposals to determine if these were the best and final offers.
Responding, Mrs. Mitchell stated that she could contact the local vendors to obtain a final offer.
Mr. Hare noted the significant difference between some of the proposed rates and those of the City’s
current provider. In response, Mrs. Mitchell explained that the City initially began utilizing Union
Bank because their cost was low and had been using this provider for a little more than three (3)
years.
In response to Mr. Anderson, Mrs. Mitchell confirmed that the services offered by all providers were
the same.
Mr. Nick Adams, Vice President, Global Capital Markets Division, Wilmington Trust, informed
members that he is a taxpayer in the City of Dover and resides in the Third District. He stated that
he was heartened by the members’ discussion and the line of questioning that had transpired. He
explained that he had been at Wilmington Trust for approximately four-and-one-half years and prior
to that spent nearly 12 years in State government in Delaware, serving as Deputy State Treasurer
during the latter portion of that time. Mr. Adams stated that he was exceptionally familiar with the
RFP processes, having previously evaluated responses and compiled responses for review. He stated
the need for the Mayor and members of Council to send a message to their constituents that the City
is open for business and informed members that he had heard them doing this loudly and clearly.
Mr. Adams stated that responses were sent by local vendors who are overwhelmingly committed to
the City, employ people and pay taxes in Dover and are located near City Hall; however, these
Page 53
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF APRIL 27, 2015 PAGE 3
vendors were not given the level of consideration because of a price and are unable to respond to a
best and final pricing request. Mr. Adams expressed his opinion that going straight from the RFP
is a disservice to local vendors and to the City.
Mr. Adams informed members that it was noted in M & T Bank and Wilmington Trust’s response
and letter to the City of Dover that this firm is the largest full-service commercial bank in Delaware
based on deposit market share, having employed nearly 2,100 people in Delaware. Additionally,
over the past three (3) years, employees had volunteered over 50,000 hours of their time to
organizations throughout Delaware and contributed nearly $5M dollars to not-for-profit
organizations in all three (3) counties. Mr. Adams indicated that they had contributed well over
$100,000 to numerous projects, non-profit organizations, and community events in the City of
Dover, including the new City of Dover Public Library, previous title sponsorship of the Dover Days
Festival, title sponsorship of City of Dover fireworks, title sponsorship this year of the Biggs
Museum of Art Gala, and contributions to the Schwartz Center and many other organizations. He
stated that M & T Bank and Wilmington Trust was exceptionally gracious in reconfiguring its
parking lot and drive through to allow ingress and egress to the new library and to City Hall as an
accommodation for the City.
Mr. Adams stated that there are other similar cases where Wilmington Trust and M & T bank is
competing for the City’s business and losing bids over $1,000 or a couple thousand dollars and are
not given an opportunity to rebid, which is disheartening and frustrating. He indicated that there had
been a pattern of contracts going to non-resident providers based on price alone. Mr. Adams
informed members that a paying agent role recently went to the Bank of New York Mellon and
investment management services went to Public Financial Management, neither of which employ
people in the State of Delaware.
Mr. Adams felt that the City could not continue to say it is open for business and invite people to
come, and then send money to California when the City has an opportunity to put its money where
its mouth is. He advised members that Union Bank is owned by a Japanese corporation, not a
U.S.-based corporation. Mr. Adams indicated that this was a great opportunity and indicated that
M & T Bank and Wilmington Trust would welcome the opportunity to revisit the proposal because
they want to do business with the City. He stated his firm had shown its commitment to the City and
asked that the City of Dover show its commitment to vendors and those who want to be here in the
City.
Mr. Hare stated that he has seven (7) accounts at M & T Bank and expressed his opinion that staff
should request best and final offers. He indicated his appreciation for everything that M & T Bank
does in the community; however, he could not honestly tell the taxpayers that it was planned to go
with an offer over 200% higher than the lowest proposal. Mr. Hare stated that if the offers were
close, he would not have a problem. For comparison, he expressed his opinion that if M & T Bank
were planning to redo their bank, they would choose a contractor from New Jersey charging $30,000
versus a local contractor charging $100,000.
Mr. Adams concurred with Mr. Hare; however, he stated that in this case the 200% difference
represents approximately $10,000, which is fractional compared to the amount of money paid in
property taxes by M & T employees who reside in the City. He asked that this be considered in
terms of actual dollars and cents.
Page 54
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF APRIL 27, 2015 PAGE 4
Responding to Mr. Sudler regarding the reason for the vast difference in price, Mr. Adams stated that
competitors, particularly non-resident competitors, often want to find opportunities to get a foothold
into markets where they do not have one. He advised members that Wilmington Trust and M & T
Bank serves in excess of 80% of all municipal clients in Delaware, including the State of Delaware
and its numerous entities, and if an organization like Union Bank can cut their price significantly to
get a foothold into this market, this is found business for them. Mr. Adams indicated that
Wilmington Trust and M & T Bank must try to set prices in line with the services provided to the
other numerous municipalities they serve throughout the State. This becomes a bit of a double-edged
sword in that they want to provide the best level of service while charging fair fees. Mr. Adams
advised members that this did not mean that they were unwilling to sharpen their pencils and revisit
this issue.
Mr. Shevock questioned if Wilmington Trust and M & T Bank gives the same bid to every
municipality in the State of Delaware or if they look at the product to see if they can provide a better
price. Responding, Mr. Adams stated that every opportunity is evaluated on its own merit and a
price is developed. The firm’s tiered pricing suggests that a $50M account, like the City’s, should
be priced at a particular amount, and they then work from that number. Mr. Adams stated that it is
exceptionally rare when a client does not come back and request the bank to sharpen their pencils,
particularly when clients receive a lower bid. He explained that there is often a give and take
between the client and the bank as they try to develop a price that is mutually beneficial for both
parties.
In response to Mr. Slavin, Mr. Scott Koenig, City Manager, informed members that when the City’s
capital projects are bid, a 3% discount is provided for local bidders.
Mr. Slavin stated that, while there is a wide disparity between all five (5) of the offers, if the entities
that do not have a presence in Delaware were discounted, the span would be $13,979 to $16,270,
which is a very small gap. He felt that this would be worth taking a look at.
Mr. Adams stated that he would not have appeared before the Committee tonight if the decision and
recommendation set forth had been to award this business to a TD, PNC, or WSFS Bank, or to a
resident bank in the City that is as committed to the City as Wilmington Trust and M &T Bank is;
however, this was not the case.
Mr. Slavin expressed a desire not to make awards only to Delaware contractors, noting that the
Delaware Contractors Association would agree with this. He stated the desire to see Delaware’s
borders open so that our workers can work in other states and vice versa. However, he expressed
his belief that the economy in Dover and Delaware would be made stronger by taking moments like
this and reinvesting in the community.
Mr. Hare moved to recommend that Mrs. Mitchell, Controller/Treasurer, go back and ask for
a best and final offer from all five (5) respondents, seconded by Mr. Sudler and unanimously
carried.
Page 55
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF APRIL 27, 2015 PAGE 5
Downtown Dover Business Improvement District (BID) Budget and Assessment (Tax) Rates
for Fiscal Year 2015-2016
Mr. Scott Koenig, City Manager, advised that the Business Improvement District (BID) budget and
assessment are set annually. He reminded members that a number of years ago, Council identified
the BID, which is specified in Code with specific boundaries and zones, and each year the Tax
Assessor prepares a budget based on input from staff and then prepares an assessment. Mr. Koenig
explained that the City has typically raised approximately $50,000 through the BID tax. This
additional tax burden is placed on businesses in the BID and the funds raised are used for economic
development. For the past several years, this money, along with additional funds, has been
transferred to the Downtown Dover Partnership (DDP) for economic development and promotion
in the BID.
Mr. Koenig stated that the proposed tax revenue for FY 16 was $49,600. Mr. Koenig indicated that
proposed expenses would be equal to revenue since, in the past, this tax had been collected and the
tax value was then transferred to the DDP for operating expenses.
Mr. Koenig reviewed the BID Tax Calculation Worksheet, July 1, 2015 to June 30, 2016, noting that
Ms. Cheryl Bundek, Tax Assessor, had indicated that the percentages of overall revenue raised in
each zone are as follows: Zone 1 - 48%, Zone 2 - 41%, and Zone 3 - 10%, for a total of 100%.
Mr. Koenig explained that there are a certain number of parcels in each zone that qualify for the
assessment, and the total aggregated assessment for the BID is slightly more than $138M, including
the 2015 assessments. Reiterating that the revenue breakdown is prescribed by Code, Mr. Koenig
explained that this was based on the assessments, and no increase in the total revenue was proposed.
Staff recommended approval of the proposed budget and assessment (tax) rate for fiscal year
2015-16.
Mr. Hare questioned if the City manages the DDP budget. Responding, Mr. Koenig stated that the
City’s prepares the draft budget figures for the DDP and pays their bills; however, the DDP manages
its own budget. He stated his belief that the DDP was cash positive by several hundred thousand
dollars. Mr. Koenig advised members that a budget is presented to the DDP Board and includes all
operating expenses, such as the cost of managing properties; property loans; office expenses such
as rent, electricity, and office supplies; contractual services, such as meter repairs; and other services
associated with the properties owned, such as mortgage payments and rent receipts.
Mr. Hare questioned if members would be provided the information that would be presented in the
DDP budget before making a decision. He stated, for example, that if there were $300,000 in the
DDP’s account, they might not need some of these funds this year. Responding, Mr. Koenig
explained that the DDP’s budget is a separate issue from the BID tax.
Mr. Hare questioned if funds would be automatically transferred to the DDP if the BID tax and
assessment were approved. Responding, Mr. Koenig stated his belief that funds would not transfer
automatically; however, the assumption would be that they would be transferred.
Page 56
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF APRIL 27, 2015 PAGE 6
Mr. Slavin stated that this would offset $49,600 in other areas.
Mr. Anderson questioned why various businesses have different assessments and zones.
Responding, Mr. Koenig stated his recollection that Zone 1 is the area closest to Loockerman Street
and that the amount of the tax payment reduces going outward from this core area; however, he
indicated that he may have to clarify this before the matter goes before Council for consideration.
Mr. Anderson felt that it was presumed that there would be less benefit derived from marketing, etc.
further from Zone 1, and Mr. Koenig confirmed this.
Mr. Slavin stated his recollection that, at the time that the BID tax was created, the intention was to
leverage the higher value of properties further from Zone 1 to help some of the more blight-related
areas.
Mr. Koenig further explained that when the tax was originally implemented, Mainstreet Dover was
the core area and primary beneficiary.
Mr. Slavin stated that since 2003 he had commented annually that he hates this tax since he cannot
understand how the City could entice people to open businesses in this area by saying that the City
will effectively assess more taxes on them when they come into the BID. He expressed his hope that
this issue could be addressed later this year. Mr. Slavin stated his opinion that this rate is set for the
purposes of budgeting so that it is loaded as Council goes into the budget year.
Mr. Anderson moved to recommend acceptance of staff’s recommendation to approve the
proposed budget and assessment (tax) rate for fiscal year 2015-16, as outlined in
Attachments A and B to the Business Improvement District - Assessment (Tax) Rates for Fiscal
Year 2015-2016, seconded by Mr. Sudler and unanimously carried. [City Clerk’s Office Note:
Subsequent to the meeting, Ms. Cheryl Bundek, City Assessor, provided a revised report for
the Business Improvement District - Assessment (Tax) Rates for Fiscal Year 2015-2016
(Attachment #1). Corrections to the Business Improvement District Tax Calculation Worksheet,
July 1, 2015 to June 30, 2016, reflect the percentages of revenue raised as required by Code.]
Mr. Hare moved for adjournment, seconded by Mr. Sudler and unanimously carried.
Meeting adjourned at 6:33 p.m.
Timothy A. Slavin
Chairman
TAS/TM/js/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2015\04-27-2015 LF&A.wpd
Attachment
Attachment #1 - Revised - Business Improvement District - Assessment (Tax) Rates for Fiscal Year 2015-2016
Page 57
ATTACHMENT #1
LF&A Committee Meeting of 04/27/2015
Revised 05/07/2015 by deleting text indicated in red strikeout and inserting the bold, blue text as
follows:
CITY OF DOVER
LEGISLATIVE FINANCE AND ADMINISTRATION COMMITTEE
April 27, 2015
BUSINESS IMPROVEMENT DISTRICT -
ASSESSMENT (TAX) RATES FOR FISCAL YEAR 2015-2016
Submitted by: Cheryl A. Bundek, AAS
INTRODUCTION
The Business Improvement District (BID) Ordinance adopted by City Council requires that Council
must adopt a BID budget and assessment every year. This report presents the proposed budget and
assessment for fiscal year 2015-16.
ORDINANCE REQUIREMENT AND BUDGET
(A) Appendix D, Article III, Section 9(f) requires that a budget be submitted to City Council for
consideration and approval.
For your consideration, we have attached the FY 2015-2016 budget showing BID tax revenue
and the expenses charged against this revenue (Attachment A).
(B) For your consideration, we have also provided the tax calculation worksheet with
recommended rates (Attachment B).
REQUEST FOR ACTION
We request Council to approve the following budget for fiscal year 2015-16 Attachment A, and
Assessment (Tax) Rate for 2015-16 - Attachment B.
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\ATTACHMENTS & EXHIBITS\Committee Attachments\2015\04-27-2015 LF&A\Revised -
Business Improvement District - Assessment (Tax) Rates for FY 2015-2016.doc
1
Page 58
ATTACHMENT A
BUSINESS IMPROVEMENT DISTRICT
CASH RECEIPTS BUDGET FOR 2015-16
BID TAX REVENUE AND EXPENSES CHARGED AGAINST THIS REVENUE
ADMINISTERED THROUGH CITY OF DOVER
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
1. The amount hereinafter named aggregating Fifty thousand Forty nine thousand, six
hundred, (49,600) dollars or so much thereof as may be necessary is hereby appropriated
from current revenues and other funds for economic development purposes for the fiscal year
beginning July 1, 2015, and ending June 30, 2016:
REVENUE PROPOSED
Tax Revenue $49,600
EXPENSES
Personnel & Administration Expenses $49,600
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\ATTACHMENTS & EXHIBITS\Committee Attachments\2015\04-27-2015 LF&A\Revised -
Business Improvement District - Assessment (Tax) Rates for FY 2015-2016.doc
2
Page 59
ATTACHMENT B
CITY OF DOVER
LEGISLATIVE FINANCE AND ADMINISTRATION COMMITTEE
April 27, 2015
BUSINESS IMPROVEMENT DISTRICT -
ASSESSMENT (TAX) RATES FOR FISCAL YEAR 2015-2016
BUSINESS IMPROVEMENT DISTRICT
TAX CALCULATION WORKSHEET
JULY 1, 2015 TO JUNE 30, 2016
ZONE 1 ZONE 2 ZONE 3 TOTAL
Aggregate Assessments $38,489,300 $61,080,200 $38,670,200 $138,239,700
Assessment Tax Rate per $100 0.0644 0.0325 0.0128 ---
0.0624 0.0335 0.0132
Revenue Raised $24,800 $19,900 $4,900 $49,600
$24,000 $20,500 $5,100
% Revenue Raised 50% 40% 10% 100%
48% 41%
Number of Parcels 113 105 42 260
Average Assessment $219 $190 $117 $526
$212 $195 $121 $529
NOTE: These figures were estimated per the 2015 reassessed values. The revenue percentages by
Zone are per the City of Dover Code Appendix D-Article III, Section 9(e).
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\ATTACHMENTS & EXHIBITS\Committee Attachments\2015\04-27-2015 LF&A\Revised -
Business Improvement District - Assessment (Tax) Rates for FY 2015-2016.doc
3
Page 60
Monthly Report
March 2015
Office of City Assessor
Page 61
Number of Deeds Stamped for Transfer Tax Dollar Amount for
the Month of March 2014/2015 the Month of March 2014/2015
$195
40 34 $200
Thousands
30
20 14
10 13 16 $100 $28 $19 $67
5 $19 $2 $5 $0
10 2 2 3 0 2014 2014
0 $0
2015 2015
First Time Buyer for the March 2014/2015 Realty
PropertySales in Dollars
Month of March 2014/2015 Received Prior to Recording
14
15 13 $13
10 $15
Millions
Res. Non‐First $10 $2
10 $1 $2 $4 $0 $0
Time Buyers $5 $0
2014
Res. First Time $0
5 2
2015
Buyers
0
2014 2015
Major Updates
January ‐ 15 February ‐ 15 March ‐ 15
Assessment Change ‐$174,600 $1,353,100 $953,200
Residential Sales Ratio Report
Sales in Study Total Assessed Total Sale Price Ratio PRD
Value
8 $1,349,100 $1,336,020 1.01 1.03
Ratio – Assessed Value divided by Sale Price.
PRD – Mean – A PRD above 1.03 tends to indicate assessment regressivity – high valued properties are under
appraised relative to low valued properties. A PRD below .98 tends to indicate assessment progressivity – high
valued properties are relatively over appraised.
Page 62
Points of Interest
Scanning & Filing
‐ All new deeds are being scanned and attached to the CAMA software for easy retrieval.
‐ All appeal documents and correspondence are being scanned and attached to the CAMA software for
easy retrieval.
‐ All old property record cards are being scanned and indexed into Fortis.
2015 Revaluation
‐ Completed Informal Hearings and mailed out new value notifications.
Assessor’s Office
‐ Finalized and printed Assessment Registers for the April 01, 2015 deadline.
Page 63
APR 20, 2015 CITY OF DOVER PAGE: 1
10:09 AM SALES RATIO REPORT CA324
PARID NBHD LUC ADDRESS UNITS STYLE YRBLT STORIES SFLA GRADE CDU TOTAL APPR SALE DT PRICE ASR
ED05-067.11-01-23.00 11 R10 922 WILSON DR 1 5 1968 2 2419 C+ GD 220,500 20-MAR-15 190,000 1.16
ED05-067.12-04-16.00 8B R10 52 REPRESENTATIVE LN 13 2015 2 2095 B- AV 157,500 02-MAR-15 191,220 .82
ED05-068.15-04-71.00 25A R10 297 TEA PARTY TRL 13 2014 2 1914 B- AV 172,900 03-MAR-15 159,900 1.08
ED05-076.03-01-04.00 25 R10 16 CANNON MILL DR 1 2014 2 1886 C+ AV 189,700 19-MAR-15 225,000 .84
ED05-076.05-03-01.00 16D R10 2 STONEY DR 1 14 1985 1 1324 C+ AV 161,900 11-MAR-15 142,000 1.14
ED05-076.07-02-21.00 17 R10 7 PAUL REVERE CT 1 5 1988 2 2522 B GD 205,300 16-MAR-15 197,900 1.04
ED05-076.08-02-47.00 23 R10 216 N NEW ST 1 2 1930 1 700 D+ FR 45,100 03-MAR-15 35,000 1.29
ED05-077.11-05-29.00 16J R10 42 MER WAY 8 2013 2 2242 B- AV 196,200 05-MAR-15 195,000 1.01
Page 64
March 30, 2015
Cheryl Bundek, AAS, Assessor
City of Dover
5 E Reed St.
P.O. Box 475
Dover, DE 19903-0475
The following is a listing of current activities and the status of each for the
City of Dover Revaluation Project to date. Please note new items in bold:
I. Project Commencement
• September 11th – Project kick off meeting held with Melissa
Baer, Annette Hart and Cheryl Russell in attendance. Topics
discussed include the following:
o Proposed project schedule was reviewed. A detailed
project plan was also emailed as part of the kickoff
documents provided.
o The contract was reviewed in detail. Clarified topics
included:
The data mailer was reviewed and an updated
sample is attached. Mailing was tentatively
scheduled for first week of October. A small initial
mailing was recommended so any issues could be
resolved prior to mailing the balance of the town.
Collection of data for income producing properties
was discussed. It was decided that Income &
Expense forms would be mailed out with a return
date of October 31st.
o Public relations was discussed.
Page 65
An initial press release would be issued (Melissa to
submit sample).
A link to the Tyler video was also suggested.
A presentation prior to issuing values will be
presented before council.
• September 16th – Melissa submits sample press kit and press
releases. Also provided, the link to the Tyler video to determine if
it could be launched from the City’s website. Sample data
mailer glossary submitted for consideration.
• October 10th – Zachary provides remote connection information
and logins.
II. Data edits
• October 22nd – Melissa provides list of edits run on the
residential file and results to review.
III. Residential Analysis and Review
• October 13nd – Debra Christy starts review of existing
neighborhoods and recent sales.
• October 21st- Ryan Zuck received Residential Neighborhood GIS
Map from Assessor and mailed to Debra.
• November 18- 20th – Debra Christy on site to drive the City of
Dover to determine combination of existing neighborhoods.
• December 3rd- New neighborhood assignments are imported
into Dover 2015.
• December 4th- Melissa updated residential Marshall and Swift
cost calibrations into Dover 2015.
• December 8th – Dover 2015 land and building re-cost to continue
with land analysis.
• December 18th – Preliminary land values and building cost
calibration completed.
• January 12th – January 16th – Debra Christy, Elyse Pare and Chris
Gobin review and finalize residential file for Model generation.
Page 66
IV. Residential Analysis and Review (continued)
• January 17th – 18th – Melissa Baer generates and runs Residential
Model for market and comparable property analysis for all Dover
residential properties.
• January 19th- Residential Final Review continues. (Debra Christy,
Elyse Pare and Chris Gobin.)
• January 29-30th - Residential NBHDS 2, 3 and 4 are turned over for
Assessor Review.
• February 9th –Residential NBHDS 3A, 6 – 11, 14 and 16 – 18 are
turned over for Assessor Review.
• February 11th – Residential condominiums are turned over for
Assessor Review.
• February 13th – Elyse Pare completes and turns over Ratio Studies,
Residential and Commercial sales listings and Dover Revaluation
and Impact Analysis Power point presentation.
V. Commercial Analysis and Review
• October 20th – Steve Beccio starts review and validation of
commercial industrial sales.
• November 17- 21st -Steve Beccio on site in Dover to review
commercial land and sales.
• November 18th – December 1st - Steve Beccio updates income
and commercial land tables in Dover 2015 based on income
and expense report data received and sales analysis.
• December 05th - Commercial valuation review commences in
neighborhoods C36.
• December 05th – January 28th – Steve Beccio conducts
commercial/exempt value review.
• January 29th - January 30th –Commercial NBHDS are turned over
for Assessor Review.
Page 67
VI. Informal Review Process
• February 13th – Chris Gobin sends valuation file to City of Dover
for production and mailing Notice to Taxpayers.
• February 20th to 23rd – City of Dover mails notices.
• February 24th – Phone calls start for informal review
appointments.
• March 2nd – Informal Review Appointments scheduled to begin.
• March 2nd- March 18th – Ryan Zuck conducts Informal Reviews
at City Hall Assessor’s Office.
ACTION ITEMS:
CITY OF DOVER:
• Completed data edits in preparation of data inventory
mailings.
• Provided any returned Income and Expense reports to Steve
Beccio for analysis.
• Mailed out Property data inventory reports.
• Review returned property inventory reports for corrective
action.
• Assessor completion of Review of Values.
• Mailing of Notices to Taxpayers.
• Mailing of Re-Notice to Taxpayers.
ACTION ITEMS:
CLT:
• Completed Residential Neighborhood analysis.
• Completed Residential land and sales analysis.
• Completed Commercial income and sales analysis.
• Melissa Baer creates Residential Model and Runs comparable
properties.
• Completed Commercial value review.
• Completed Residential Value Review.
• Completed Commercial and Residential Value turnover.
Page 68
• Conducted Informal Review Appointments and Reconciliation
Process.
• March 30, 2015 -Produced file for Re-notice to Taxpayers and
provided to City of Dover.
TOTALS FOR INFORMAL REVIEWS:
LUC LUC Desc Count
Apartments 5+
A90 units 7
C00 Comm Vacant 17
Banks, Savings,
C10 Loan 3
C20 Gas Stations 2
C30 Restaurants/Retail 22
C40 Motels/Hotels 3
C50 Shopping Ctrs 2
C60 Office Bldg/Labs 14
C67 Offices 4
C70 Garage/Shop 1
C80 Warehouses 5
C91 Recreation 1
C92 Mobile Homes 2
C93 Burial Grounds 1
C95 Private Schools 2
C98 Comm Aux Bldg 10
I20 Heavy Industrial 1
R0 Res Vacant Land 56
R10 Single Family 110
R30 Three Family 1
R40 Four Family 1
R50 Condo 5
R90 Multiple Dwellings 1
Grand Total 271
Page 69
Respectfully Submitted,
M
Melissa Baer, CAE, CCMAII
Northeast Regional Manager
cc: Debra Christy
CITY OF DOVER, CT
2015 REVALUATION PROJECT
TYLER STAFF
MELISSSA BAER – PROJECT SUPERVISOR
DEBRA CHRISTY - RESIDENTIAL APPRAISER
ELYSE PARE – RESIDENTIAL APPRAISER
CHRIS GOBIN – IAS SUPPORT/ RESIDENTIAL APPRAISER
STEVE BECCIO – COMMERCIAL APPRAISER/ ERIC HARDY SENIOR APPRAISER
RYAN ZUCK – HEARING OFFICER/ RECONCILLIATIONS
Page 70
City of Dover
2015 Revaluation Project Plan
Activity From To Progress Responsible Party
Project Commencement 9/11/14 9/11/14 100% Melissa Baer
Data Mailers (mailed) 10/6/14 10/24/14 100% City of Dover
Database Edits 9/29/14 10/22/14 100% Melissa Baer
Valuation Analysis Land 11/17/14 12/19/14 100% Debra Christy
Valuation Analysis Buildings 11/17/14 12/19/14 100% Melissa Baer |Debra Christy
Valuation Analysis Income & Expense 10/20/14 11/28/14 100% Steve Beccio
Market Modeling 12/01/14 12/19/14 100% Melissa Baer
Review of Values - Residential 01/12/15 02/11/15 100% Debra Christy | Elyse Pare
Review of Values – Commercial 12/05/14 01/30/15 100% Steve Beccio
Assessor Review of Values 01/29/15 02/13/15 100% Cheryl Russell Bundek
Mail Notices to Taxpayers 2/20/15 2/23/15 100% City of Dover
Schedule Informals 2/24/15 3/06/15 100% Diane Anderson
Conduct Informals 3/02/15 3/18/15 100% Ryan Zuck
Informals Resolution 3/09/15 3/18/15 100% Ryan Zuck
Project Completion 3/20/15 3/20/15 100% Ryan Zuck |Melissa Baer
Note: Staffing will be determined by availability based on commitments to other
projects and may differ from the plan. All staff is subject to the approval of the
Assessor.
Page 71
CITY MANAGER’S
MONTHLY REPORT
MARCH 2015
City Manager’s Monthly Report, March 2015
Page 72
Customer Services
In the month of March, we processed 5,529 credit card payments for the month totaling $1,327,236.38.
Library
801 attended 83 programs for adults.
422 attended 33 programs for teens.
896 attended 35 programs for children.
33 volunteers completed 377 hours of service.
441 attended 59 programs/classes coordinated through the Job Center.
Public Works
Working on CIP and additional funding for future street program and other projects.
2 City Manager’s Monthly Report, March 2015
Page 73
CUSTOMER SERVICES
WORK ORDERS PROCESSED Extensions of Credit382
3,000
400 358
2,500 316 308 292 300
2,161
2,018 2,053 300 268
2,000 1,809 1,882 1,776 1,855 244
1,749
1,613 1,570 1,599 198 202 211 208
1,437
1,500 1,298 200
1,000 100
500
Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- 0
14 14 14 14 14 14 14 14 14 14 15 15 15 Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar-
14 14 14 14 14 14 14 14 14 14 15 15 15
Write-Offs / Electric & Trash Bills
Final quarters of write off pending. The electric write-off for outstanding electric bills with dates ranging mainly from April 2011 until June
2011. The proposed write-off of $45,671.10 includes 3,414.68 from accounts that filed for bankruptcy. The 45,671.10 is the fourth write-
off for Fiscal 2013 and is 18 percent of the revenue ($24,964,901.) for the write-off period. In other words, the City collected 99.82% of all
bills for the write-off period. For every $100 dollars of revenue the City billed in the write-off period, $0.18 was not collected.
The trash write-off for outstanding trash bills with dates ranging mainly from April 2011 until June 2011. The proposed write-off of
$1,727.43 includes $70.98 from accounts that filed bankruptcy. The $1,727.43 is the fourth write-off for Fiscal 2013 and is $0.34 percent of
the revenue ($507,757) for the write-off period. In other words, the City collected 99.66% of all bills for the write-off period. For every
$100 of revenue the City billed in the write-off period, $0.34 was not collected.
The electric write-off for outstanding electric bills with dates ranging mainly from July 2011 until Dec 2011 . The proposed write-off of
$95,241.42 includes 6,019.52 from accounts that filed for bankruptcy. The $95,241.42 is the first & second write-off for Fiscal 2014 and is
the average of .20 percent of the revenue ($24,507,815.) for the write-off period. In other words, the City collected 99.80% of all bills for
the write-off period. For every $100 dollars of revenue the City billed in the write-off period, $0.20 was not collected.
The trash write-off for outstanding trash bills with dates ranging mainly from July 2011 until Dec 2011. The proposed write-off of $3,613.37
includes $210.64 from accounts that filed bankruptcy. The $3,613.37 is the first & second write-off for Fiscal 2014 and is the average of
$0.38 percent of the revenue ($475,652) for the write-off period. In other words, the City collected 99.62% of all bills for the write-off
period. For every $100 of revenue the City billed in the write-off period, $0.38 was not collected. According to the APPA, the industry
standard for collections among publicly held utilities of similar size is 99.74% of total electric revenue. The accounts are currently assigned
to our collection agency and will remain there even when they have been written off. A complete list of accounts is available upon request.
Major Program Updates Mar 2015 Mar 2014 Difference FY 2015 FY 2014
Year-to-Date Year-to-Date
Number of Customers Served 19,543 20,983 (1,440) 188,736 191,901
Final Bills 611 585 26 5,820 5,634
Estimated Bills 201 188 13 1,566 1,543
Penalties Posted $ 20,726 $ 20,207 519 $ 163,698 $ 172,183
Extensions of Credit - Amount Extended $ 82,496 $ 74,383 8,113 $ 729,002 $ 664,008
Balance Transfers $ 11,104 $ 5,228 5,876 $ 35,255 $ 39,714
Utility Collections $ 21,651 $ 31,308 (9,658) $ 178,546 $ 214,486
Special Assessments $ - $ - - $ - $ -
Miscellaneous Billings $ 71,205 $ 111,752 (40,546) $ 816,940 $ 1,203,779
CNP through Disconnect Collars $ - $ 9 (9) - 179
Court Cases - - - - -
Tamperings - 2 (2) - 2
Taxes Levied (includes carry forward) $ 510,353 $ 314,296 196,057 $ 10,950,973 $ 10,910,356
Billing Adjustments $ (2,524) $ 6,453 (8,977) $ 282,950 $ 18,387
Total Taxes Collected $ 17,794 $ 43,670 (25,876) $ 10,743,193 $ 10,651,665
Taxes Outstanding $ 490,035 $ 277,078 212,957 $ 490,035 $ 277,078
Payments in Lieu $ - $ - - $ 330,532 $ -
City Manager’s Monthly Report, March 2015 3
Page 74
HUMAN RESOURCES
Mar April May June July August Sept Oct Nov Dec Jan Feb Mar
Category Total
14 14 14 14 14 14 14 14 14 14 15 15 15
*
Caucasian 290 289 290 292 291 290 290 291 288 290 287 286 289 N/A
*
Minorities 58 58 58 58 58 58 61 61 61 62 63 62 63 N/A
Hired 3 0 1 3 1 1 5 5 0 5 1 0 9 34
Terminated/
Resigned/ 0 1 0 1 2 2 2 4 3 2 3 2 5 27
Retired/Other
Transferred/
3 0 1 0 0 1 0 3 5 1 0 0 0 14
Promoted
Jobs Posted 3 3 2 3 4 4 2 3 3 3 3 2 7 42
Workers Comp. Inju-
2 0 1 1 2 2 1 2 5 1 1 3 3 24
ries
Workers Comp. Hours 128 125 51 130 86 160 51 22 32 2 17 29 312 1145
Insurance Claims 4 4 6 4 0 1 4 1 1 5 4 1 3 38
Full-time Employees: 333 Part-time Employees: 19 (3 Pitts Center, 1 Recreation, 13 Library, 1 Customer Service, 1 Central Services)
-Numbers do not reflect, temporary, seasonal, relief fire dispatchers, committee or council members.
Positions Posted: Mechanic (Fleet, Public Works), Playground Leaders I (Parks and Recreations, Pitts Center), LAN Analyst (Information
Technology), Service Center Clerk (Parks and Recreation, Pitts Center), Library Clerk I (part-time), Field Supervisor I (Public
Works Streets), In-House Crew Leader (Public Works, Sanitation)
Positions Hired: Mechanic (Fleet, Public Works), Administrative Assistant (Finance Department), Groundworker I (Electric Department),
Water Treatment Operator (Public Works), Police Officers (5)
Position Resigned/Retires: Mechanic (Fleet, Public Works), Administrative Assistant (Information Technology), Water Treatment
Plant Operator (Public Works), Nursery Person II (Public Works), and Motor Equipment Operator I (Public Works)
Unfilled/Open Positions by Department*
Unfilled/Open Positions Mar April May Jun July Aug Sept Oct Nov Dec Jan Feb Mar
By Department 14 14 14 e 14 14 14 14 14 14 15 15 14
14
Electric 5 5 5 5 4 5 25 5 2 2 2 4 3
Public Works 13 13 11 10 11 11 12 11 12 12 12 13 15
Police 0 1 1 1 0 2 2 0 1 1 10 10 4
All Other Departments 5 5 4 2.5 4 3.5 4.5 5 5 3 3 4.5 4.5
Totals 23 24 21 18.5 20 21.5 23.5 21 20 18 28 29.5 26.5
*Not used for Budgeting Purposes
²
The following has been updated to reflected the Fiscal 2014-15 Budget
Electric: Electrical Engineer, Engineering & System Operations Superintendent, Groundworker I
Public Works: Utility Maintenance Mechanic I/Wastewater, Motor Equipment Operator III (Streets), Crew Leader I (Sanitation), Civil Engineer l, Field
Supervisor II (Grounds), Environmental Scientist, Water Treatment Plant Operator, Mechanic I, Public Works Inspector (Public Works), Laborer II
(Grounds), Motor Equipment Operator I (Streets), Motor Equipment Operator II (Streets), Motor Equipment Operator I (Sanitation), Nursery Person II
(Grounds), Field Supervisor I (Streets)
Police: Cadets (6, part-time), Central Services Coordinator
*Police Officer (5) 9/2015
All Other Departments: (2) Customer Service Clerk II (part-time); Librarian II, LAN Analyst (IT), Service Center Clerk (Pitts Center, part-time) Adminis-
trative Assistant (Information Technology)
4 City Manager’s Monthly Report, March 2015
Page 75
HUMAN RESOURCES
continued
Turnover Statistics
2010 2011 2012* 2013 * 2014 2015
Total Turnover % 5.57 6.75 11.00 10.91 6.02 2.86
Termination Turnover % 0.27 1.08 0.29 1.47 .57 0
Resignation Turnover % 2.12 4.05 5.21 5.01 2.29 2
Retirement Turnover % 3.18 1.62 5.50 4.42 3.15 .86
* Healthcare cost sharing implemented
** Healthcare cost sharing implemented for DOE
Average Employees
2010 2011 2012* 2013* 2014 2015
Total Number of Employees Separating from
Service 21 25 38 37 21 10
Average Number of Full-time Employees 362 356 333 325 331 331
Average Number of Part-time Employees 16 15 12 14 18 19
* Healthcare cost sharing implemented
City Manager’s Monthly Report, March 2015 5
Page 76
INFORMATION TECHNOLOGY
Service Requests Resolved Citizen Action Center - Customers w/ New Issues
200 188
150
164 164
130
150 128 125
111
120 116 121 110
102
100 91 90 90 160
54 70 122 130 112
108 95
50 50 92
73 78
30 55 50 53 42
0 10
Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar-
14 14 14 14 14 14 14 14 14 14 15 15 15 14 14 14 14 14 14 14 14 14 14 15 15 15
Programming Requests Completed Page Views - City of Dover Web Page
30 28 35,000
25 30,000
22
18 18 25,000
20
Pages Viewed
16 17
15 15 20,000
13
31,605 31,423
15 12
27,911 28,026 27,275 28,370
11 11
26,455 26,498 26,428 25,426 26,428
10 15,000
23,955 23,845
10
10,000
5 5,000
0 0
Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Mar- Apr - May- Jun- Jul- Aug - Sep - Oct- Nov- Dec- Jan- Feb- Mar-
14 14 14 14 14 14 14 14 14 14 15 15 15 14 14 14 14 14 14 14 14 14 14 15 15 15
Current
Performance Indicators Last Month Same Month
Month
Last Year
iSeries Availability 100% 100% 100%
Server Availability 100% 100% 100%
AS/400 Connections
(concurrent/authorized users)
N/A N/A N/A
PCs Supported 378 372 364
Scheduled PCs Replaced - - -
Servers Supported 30 30 19
People Trained 19 36 14
Availability Statistics based on 7:00 AM until 5:00 PM Monday—Friday
6 City Manager’s Monthly Report, March 2015
Page 77
LIBRARY
Reference Transactions
1200
1000
800
600
400
200
0
Adult Teen Children
Mar 15
Adults – 1,681 Teens – 371 Children – 534
Circulation Mar 15 FYTD 15 Mar 14 FYTD 14
Dover residents 19,421 183,492 20,595 192,935
Ebooks 2,260 18,216 1,518 12,417
Kent residents* 13,004 121,881 14,822 137,2018
Non-county residents 1,777 18,059 2,411 21,769
Registrations
Dover residents 308 3,182 368 3,400
Kent residents* 34 374 38 661
Non-county residents 7 59 5 66
Other
Visiting Patrons 31,155 254,566 28,231 274,742
Meeting Room Usage 2,163 15,795 2,025 19,048
Photocopier Usage 945 9,762 1,117 10,890
Computer Printing Usage 3,740 28,489 3,184 24,468
Computer Users 4,871 42,375 4,347 42,262
Wireless Computer Users 1,730 15,567 1,442 11,743
Holds (Total) 6,815 59,491 6,513 62,004
*Breakout of Kent County Residential Statistics
Circulation Registrations
Harrington: 154 Harrington: 1
Milford: 91 Milford: 0
Smyrna: 791 Smyrna: 4
Outside City Limits: 11,968 Outside City Limits: 29
Total Registered Users: (Card Holders)
City: 26,899 Kent County: 13,100 Outside Kent County: 1,069
Other Points of Interest:
Inter/Interlibrary: 66 items loaned out Technical services: 1,784 items added
40 items borrowed 964 items deleted
Volunteers: 377 hours of service completed
City Manager’s Monthly Report, March 2015 7
Page 78
PUBLIC WORKS
Administration
Administrative review and inspection services continued on all residential and commercial developments.
The following residential subdivisions are in various phases of construction:
Oak Shadows Emerald Pointe Eden Hill (Residential)
Patriot Village Clearview Meadows Village of Cannon Mill
Sanitation
Monthly Total Refuse (Tons) Sanitation Hours
1,500
1200
927
1000
1,000 873 835
895
834 848 875
827
699 726 717
800
648
541 600 520 520 498 498
500
400 281 281
205 211 217
146 171 168 166 151 166 173 135
127 110 200 53 53
- 0
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Bulk Collection Mechanized Hand Trash Container
14 14 14 14 14 14 14 14 14 14 15 15 15 Collection Collection Repair/Delivery
Bulk Automated Mar 15 Mar 14
MARCH 15 FYTD 15 MARCH 14 FYTD 14
Trips to DSWA Sandtown Landfill 178 1,628 170 1,850
Total Tonnage to DSWA 933.78 8,527.28 825.55 9,106.54
90-Gallon Containers Delivered 26 269 26 175
300-Gallon Containers Delivered 11 43 11 31
Total Man Hours-containers Delivered 53 318 53 329
CURBSIDE RECYCLING TOTAL # OF TOTAL # OF
STATS HOUSEHOLDS ACCOUNTS WEIGHT/LBS. AVE. LBS.
COLLECTED
March 2015 19,692 9,0921 290,600 14.76
8 City Manager’s Monthly Report, March 2015
Page 79
PUBLIC WORKS
continued
Streets MARCH 15 FYTD 15 MARCH 14 FYTD 14
Signed Installed 21 273 85 286
Signs Repaired 25 98 49 102
Curbs Painted Yellow (feet) 0 626 0 1,245
New Post Installed 5 32 17 51
Storm Catch Basins Repaired 2 7 2 11
Storm Catch Basin Repairing (Hrs.) 28 89 28 69
Storm Catch Basins Cleaned 1 172 1 1,536
Storm Catch Basins Cleaning (Hrs.) 6 90 6 556
Hot Mix Patching (Tons) 0 0 0 0.50
Hot Mix Patching (Hrs.) 0 0 0 0
Cold Mix Patching Hrs.) 0 213 0 224
Concrete Work (Hrs) 0 103 0 237
Concrete Patching (Cubic Yards) 0 1 0 8
Ditch Work (Hrs). 0 3 0 0
Street and Alley Maintenance (Hrs) 142 478 142 950
Street Sweeping (Miles) 810 6,057 810 6,475
Street Sweeping (Cubic Yards) 216 1,444 216 1,564
Grounds
Total Work Orders = 5 General = 3 Arborist = 2
Arborist Crew MARCH 2015 MARCH 2014
Trees Trimmed 5 5
Trees Removed 15 15
Stumps Removed 4 4
Limed low street trees.
Completed trimming alleys.
Removed trees and stumps.
Beautification Crew
Worked primarily with greenhouse preparations.
Began plantings.
Mowing Crew
Assisted Arborist Crew with alley tree trimming.
City Manager’s Monthly Report, March 2015 9
Page 80
PUBLIC WORKS
continued
Geographic Information Systems (GIS)
City Clerk's Office Updated Voting Web App according to conversation with
the Clerk's Office
City Clerk's Office Printed out 10 copies each of the four Voter District Maps
and 12 copies of full city with all Districts visible. Maps
printed at 16"X21". 52 Maps total.
City Manager's Office Created an 8.5"x11" map of the Downtown Dover
Partnership owned properties. Exported to PDF and
provided to Scott and Denise.
Code Enforcement Create editing application for vacant buildings and
demolitions
Dover PD Worked with Dover PD to create a map for an
investigation. Confidential. Printed a copy of the map at
36"x48".
Grounds Create and print 3 posters for Chris Kohout's presentation
to an elementary school
Inspections Scanned eight pages of the Jersey Mike's Building plan.
Created a PDF document and printed out a copy of each
page at 24"x36". Asked to edit the documents to remove
"Jersey Mike's" logos before printing again. 16 copies
made.
Mountain Consulting Created water and sewer utility maps for the area around
Public works the proposed development of Bay Village. Sent PDF copies
of the maps to Troy Adams at Mountain Consulting.
Planning Created Aerial Golf images for Youth Government Day.
Consequentially modified them to 8.5"x11" when the
plotter broke. Modified last year’s Youth Gov Day docs for
2015 and printed out multiple copies.
Planning Ran the Aerial Golf game at Youth Government Day. Did
preparatory set-up.
Public Works Worked on Granite XP multiple times this week
Public Works Had to move all Streets feature classes out of feature
dataset and republish services
Public Works Troubleshoot and resolves issues between the camera
Trouble shooting issues with truck and the office version of Granite XP
Public Works Created a layer showing the locations and dimensions of
several utility easements the City controls.
Public Works GIS Updated the Parcels, Active AHIs and Rental layers.
Public Works Updated the Demolitions layer with new data and fields.
GIS/Inspections Moved to Update_to_SDE.
10 City Manager’s Monthly Report, March 2015
Page 81
PUBLIC WORKS
continued
Fleet and Facilities Management
PM Work Orders Completed: 16 Number of Tire Repairs: 8 Number of Road Repairs: 10
Other Work Orders: 67 Repair Hours: 98 Road Repair Hours: 10
Total Work Orders: 83 Fabrication Hours: N/A Misc. Hours: N/A
PM Hours: 57.5
# Of Scheduled PM’s: 39
# Of Scheduled PM’s Completed: 5
Major Program Updates
MEASURE March 2015 March 2014 DIFFERENCE
Fleet Maintenance - Scheduled 5 out of 39
Preventative Maintenance ap- 12.82 % 6 out of 15
- 27.18%
pointments being kept (Quantity 40%
and Percentage)
Facilities Maintenance
Facilities - Routine work orders
19 out of 21 29 out of 29
completed within 5 days - 9.52 %
90.48 % %
(Quantity and Percentage)
Facilities - Emergency work or-
2 out of 2 1 out of 1
ders completed within 2 days 0%
100% 100%
(Quantity and Percentage)
City Manager’s Monthly Report, March 2015 11
Page 82
PUBLIC WORKS
continued
Water/Wastewater
Water Production/Billed Consumption/Flow to Kent
County
255000000
205000000
155000000
105000000
55000000
5000000
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
14 14 14 14 14 14 14 14 14 14 15 15 15
Total Water Prod. Billed Consumpt.
Total Flow to County City Readings
ENGINEERING SUMMARY
Major Program Updates MARCH 15 MARCH 14 DIFF FY15 YTD FY14
State and Federal Violations 0 violations 0 violations - - -
Water Quality Complaints 29 28 +1 93 95
Plan Review Completed Within 5 plans 4 plans
+1 79 60
30 days of Submission 100% 100%
OPERATIONAL SUMMARY
Task MARCH 15 MARCH 14 CURRENT FY
1,187,075,00
Water Production - Daily Average 4,518,935 3,969,129 0
Average Field Response Time (goal is <30 minutes) 16.00 18.36 16.00
Water Mains Repaired 1 0 34
Water Service Lines Repaired 2 0 26
Wastewater Mains Repaired 0 5 6
Wastewater Service Lines Repaired 1 1 5
Sewer Lines Flushed - linear feet 92,559 51,140 951,959
Sewer Mains Videoed -linear feet 0 0 3,185
Total Fire Hydrants in Service 1,820 1,807 1,820
Total Water Meters in City Distribution System 14,285 14,188 14,285
12 City Manager’s Monthly Report, March 2015
Page 83
ELECTRIC DEPARTMENT
System Peak Total System Load
200 100,000
.7 .2 .4
2 8 2 6
4 5 5 6 5
1 .4 5 7 ,0 1 7
.1 1 5 1 80,000 1 3 ,2 1 1 4
150 8 3 .8 .6 5
7 4 ,6 7 9
6
5
,1
5
9 ,5 7 6
3
4 2 1 0 ,3 6 5 7 8 ,1 5 ,5 ,2
. 1 9
. 7 4 2 .8 2 6 3 4 5 6 2
6 4 4 .1 .
4 1 1 3
0
6 2
9 ,0 6 ,7 9
, 0
6 6 0
6
0 .1 0 1 0 1 0 , 6
5
5
5 4
1 6 1 0
1 1 1 60,000 1
5
5
9
100
40,000
50
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 20,000
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
14 14 14 14 14 14 14 14 14 14 15 15 15 14 14 14 14 14 14 14 14 14 14 15 15 15
Outages Customers of Gained/Lost
35 8,000
20 18
25 6,000C 15 15
s u 15
e st
ga o 11 11 11
15t 4,000m
u e 10
O rs 7 7
5 2,000 5 4 4 4
5 2
-5 Apr May Jun Ju l Aug Sep Oct Nov Dec Jan Feb Mar 0
14 14 14 14 14 14 14 14 14 15 15 15 0
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
14 14 14 14 14 14 14 14 14 14 15 15 15
Outages Customers
Outages: 11 Customers: 6076
Electric Monthly Outage Report
The annual outage goal will be less than 295 Controllable Outages Average Response Time
minutes per customer, which is a Delaware Annual goal is less than 40 Goal is less than 30 minutes
Standard. This will be measured by calculating
the System Average Interruption Duration Index. Month Year-to-date Month Year-to-date
FY 15 YTD FY 14 FY 13
1 24 12.91 Minutes 27.03 Minutes
46.1 67.72 50.74
MAR 15 MAR 14 FY15 YTD
PROGRAM UPDATES
Tree Trimming 307 267 3150
Number of Oil Releases 0 0 4
Lost Time Accidents – All Electric Utility Divisions 0 0 0
New Services 11 15 69
City Manager’s Monthly Report, March 2015 13
Page 84
ELECTRIC DEPARMENT
continued
March 2015 Electric (EE Capitol Improvement Projects (CIP)
Project Number Description Update
Horsepond Substa- Progress: Work is Complete
EE1308
tion
Progress: Switchgear bids were approved by Council to PEI. Material List and Gen-
General Scott
eral Arrangement drawings are approved.
EE1312 Switchgear Replace-
ment Schedule: FY15 is for Design |FY16 budget is for construction.
Progress: Work activities are moving forward. Going to clear up a few issues on N.
Governors Blvd.
Capitol Park Up- Schedule: Scheduled for completion May 2015 weather permitting. A few services
EE1314
grade on old N. Governors Blvd. section inner loop.
Progress: Steel Poles are under construction. | expected May 4th delivery| Bid is
GOTP Transmission out for Steel Pole installation.
EE1443
Line Relocation
Schedule: Work activities are moving forward.
Progress: Surveying complete awaiting plans | Soil boring awaiting dry ground pri-
69kV Rebuild or to access at request of property owner. | $5000-7000 estimate for crop damage
EE1500 (Horsepond to Long received from farmers
Point)
Schedule: FY15 is for Design |FY16 budget is for construction.
Progress: State of Delaware requested project to be delayed to FY16.
EE1505 DNREC R&R
Schedule: Project on Hold | funds moved for other FY15 projects
Progress: All overhead transmission work done on Kesselring Property/New Burton
Road |Directional boring of proposed pond and underground relocation sched-
West Dover Con- uled.
EE1509
nector - State of DE
Schedule: Planning on relocation of underground once the weather co-operates.
Progress: City crews continuing the installation of pads/equipment
Town Point Distribu-
EE1513
tion Feeders
Schedule: Project is under construction
Progress: No other work can proceed in development without contractor installing
conduit
Chestnut Grove Sub-
EE1516
division Schedule: Not Scheduled | Contractor responsible for conduit installation in devel-
opment
Progress: Currently investigating the cables placement & engineering design. De-
69kV Cable Replace-
sign is FY15 budget.
EE1520 ment – North St.
Substation Schedule: FY16 construction to begin.
Garrison Oak Tech- Progress: Weather permitting, planning on continuing conduit installation after
EE1522 nical Park Infrastruc- WDC underground is complete.
ture Phase 2 Schedule: Work activities are moving forward.
14 City Manager’s Monthly Report, March 2015
Page 85
ELECTRIC DEPARTMENT
continued
Progress: Currently design is complete | Material has been allocated | Fees have
been received for Phase I.
Lenders Lake Apart-
EE1524
ments Schedule: No Work Scheduled | Contractor responsible for conduit installation in
development
Progress: Awaing approved railway crossing permit form Norfolk Southern. Non-
Stock material has been ordered & first section of conduit for underground is being
installed. Construction Plans are being constructed.
EE1526 Playtex Addition
Schedule: Changing daily with latest completion requested for Mid September of
2015 | Expecting a preliminary response by April 1st from Norfolk Southern Railway
(expected to take 6-8 months).
DAFB Temporary Progress: Work is Complete
EE1527
Concrete Plant
Progress: Awaiting on State of Delaware to begin project on April 6th
W. Denney's Bridge
EE1529
Project - State of DE Schedule: Awaiting State of Delaware | completion scheduled for 60 days after pro-
ject starts
Bay Health URD Re- Progress: Work is Complete
EE1530
location
Progress: Dark Fiber installation is complete. Utility Permit received. URD crossing
Windstream DAFB/ under DP&L 230 Line complete.
EE1531 Schedule: Make ready work for pole attachments along Kitts Hummock Road to be
College Road
completed in March 2015.
Dover Litho Pad Progress: Work is Complete
EE1532
Sites 1 & 2
Progress: Design Complete| Project Request Form or Material allocation estab-
DE State Police Gen- lished.
EE1533
erator Project
Schedule: Completion scheduled for April 2015.
Hardees Rte 13 Dam- Progress: Work is Complete
EE1534
age
Eden Hill Lights Progress: Work is Complete
EE1535
Phase 1
Progress: Preliminary Design complete & Fee Schedule established. Waiting on
owner to agree to fees prior to any further work on project. This is the 3rd time cus-
tomer requested & previous (2) two instances, customer declined.
EE1536 Troutman Machines
Schedule: Not scheduled
Progress: Preliminary Design complete.
Kirby & Holloway
EE1537
Restaurant
Schedule: Not scheduled
City Manager’s Monthly Report, March 2015 15
Page 86
City Planner’s Monthly Report
Planning, Inspections & Recreation
MARCH 2015
Planning, Inspections &
Recreation Highlights
Youth In Government Day - This year’s Youth In Government day was quite
successful. Teens from all the local high schools participated in learning
about governmental functions. A special thanks to the city department
heads and staff for their participation and Senator Chris Coons for speaking
with the students.
League Highlight - Playoff Indoor Field Hockey Champions were deter‐
mined in March:
Women’s Adult Champions: East Coast Motor Cars
Middle School Champions: Holtz Farms
High School Champions: Polytech
Personnel and Training
On March 11, 2015, Dawn Melson‐Williams a ended a webcast lecture en tled “Urban De‐
sign Sustainability and the Environment” sponsored by the APA Delaware Chapter.
On March 30, 2015, Timothy Mullaney, Jason Osika, and Ma hew Brown a ended training
“Incident Response to Terrorist Bombings” at the Delaware State Police Academy in Dover,
Delaware.
On March 31, 2015, Timothy Mullaney a ended training “Fraudulent Document Training
Course” at the Delaware State Police Academy in Dover, Delaware.
Page 87
Planning, Inspections & Recreation Revenue
FY '15 Budget FY '15 Actual
Revenue Stream
Business License $1,460,000 $ 1,396,306 96%
Trailer License $23,000 $ 19,908 87%
Building Permits $565,000 $ 419,806 74%
Cert. of Occupancy $6,200 $ 6,000 97%
Public Occupancy $10,000 $ 9,542 95%
Lodging House $16,000 $ 14,075 88%
Plumbing/Heating/Air $75,000 $ 51,336 68%
Sprinkler $35,000 $ 22,189 63%
Rental Inspection Fee $345,000 $ 340,235 99%
Miscellaneous $30,000 $ 29,176 97%
Fire Protection Fees $31,000 $ 28,032 90%
Vacant Building Reg. $60,000 $ 129,983 217%
Total P&I Revenue $2,656,200 $ 2,466,586.29 93%
Recreation $148,800 $ 99,514 67%
PLANNING OFFICE
The Planning Office is part of the review process for certain types of construction activity permits (Building
Permits, Sign Permits, etc.) and Certificate of Occupancy permits. For March 2015, Planning Staff was in-
volved with review of 45 Permits and 14 Certificates of Occupancy permits. (2015 calendar year total of
175 Permits and CO’s compared to 161 for 2014) and Planning Staff also reviews new applications for
Business Licenses and Rental Dwelling Permits.
COMPREHENSIVE PLAN IMPLEMENTATION
Planning Staff continues to focus on the various implementation items identified in the 2008 Comprehensive
Plan as amended.
On-going efforts of the Planning Office include and research for future ordinance amendments related to
the Recreational and Commercial (RC) zone and temporary activities
The Planning Office is also involved in the following studies and projects: City Recreational Needs As-
sessment, Restoring Central Dover Community Plan, and Transportation Improvement Districts.
Staff prepared the cover letter for the Mayor’s signature to submit the Certified Local Government
(CLG) Application. The application package was forwarded to the State Historic Preservation Office.
Page 88
Downtown Development District
The Planning Office continued to distribute the brochures and Incen-
tive Applications for the Downtown Development District program
during various public outreach activities. A second series of workshops
was held on March 11th regarding the Downtown Development District
opportunities. March 20th was the application deadline for the Large
Projects Reservation Process for the DDD Grant Program administered
by the Delaware State Housing Authority.
Comprehensive Plan Amendments 2015
The proposed Comprehensive Plan Amendments 2015 was reviewed for recommendation at
Planning Commission meeting. The Comprehensive Plan Amendments consist of two items:
a request to amend the Land Development Plan Map 12-1 for the property at 801 North State
Street and a staff initiated text amendment of Chapter 13 – Annexation Plan to remove the re-
quirements for Cost-Revenue Analysis. The Planning Commission recommended denial of
the amendment to Map 12-1 to change the land use classification for the property to 801
North State Street from Residential Medium Density to Commercial. The Planning Commis-
sion recommended approval of the amendment to Chapter 13 to remove the Cost-Revenue
Analysis requirement but suggested language be added to ensure staff still completed a simple
analysis for annexations. The Final Public Hearings and Action on the amendments is sched-
uled for the April 13th City Council Meeting. (MI-15-01A and B)
Construction Activity
Project work remains to complete the site improvements at the new Dover High School for
the eastern areas of the site including the baseball/softball field areas. Temporary Certifi-
cates of Occupancy are in place with conditions. (C-10-05/S-11-18)
For the Leander Lakes Apartments project, site preparation work continues for the 240
unit apartment complex to be located south of Forrest Avenue/Route 8 and west of Dover
High Drive.
The Planning Staff continues to participate in coordination conference calls with Calpine
regarding the Garrison Energy Center project at 450 Garrison Oak Drive (Lot 7 of the Gar-
rison Oak Technical Park). The project construction is in the final stages for the Garrison
Energy Center Phase 1(S-12-17). The Planning Office is awaiting receipt of State DNREC
permits for the Above Ground Storage Tank before approving the Administrative Site Plan
(S-14-20) for the addition of a Fuel Oil Tank.
Site construction activities continue at the Uzin Utz Manufacturing facility at 200 Garrison
Oak Drive (Lot 12 of the Garrison Oak Technical Park). A Spring 2015 completion is an-
ticipated subject to completion of utility infrastructure to serve the site. (S-13-20)
Page 89
BOARD AND COMMISSION ACTIVITY
Planning Commission
The Planning Commission met on March 16, 2015. Due to weather conditions the February
meeting was canceled and the March meeting included applications previously scheduled for
the February 17, 2015 meeting. The next Planning Commission meeting is scheduled for April
20, 2015.
S-13-03 Lands of Boyles at 527-529 South State Street — Recommended approval for a one (1) year
extension of the Site Plan Approval and Architectural Review Certification as the Ordinance allows for
this extension to be granted.
S-15-03 Building for Islamic Society of Central Delaware at 777 South Little Creek Road – Recom-
mended approval of Site Plan Application S-15-03 Building for Islamic Society of Central Delaware to
include Staff recommendations. Also approval of a Waiver to the placement of the opaque barrier fence
component adjacent the residential property (and the vegetative buffer on the project side of the fence)
along the northern property line.
MI-15-01A Comprehensive Plan Amendment 2015—Consideration of Amendment to Map 12-1: Land
Development Plan Map— Planning Commission recommended denial of the Application request to revise
the land use classification for the property at 801 North State Street from Medium Density Residential to
Commercial.
MI-15-01B Comprehensive Plan Amendment 2015 -Consideration of Amendment to Chapter 13 –
Growth and Annexation Plan – Planning Commission recommended Approval to delete the requirement
for a Cost-Revenue Analysis Study with Annexation Requests and that considerations were discussed to
ensure a simpler analysis alternative be completed instead.
Z-15-01 Lands of 801 Gold Coast, LLC at 801 North State Street: Rezoning from RG-3 to C-2A -
Rezoning Application was deferred pending City Council action on Comprehensive Plan Amendment
2015 MI-15-01A.
SB-13-06P Revised Jefferson Terrace (previously known as The Meadow) Subdivision on Jefferson
Terrace – Recommended Approval of the Preliminary Subdivision Plan on Jefferson Terrace to create
five residential lots. This Plan supersedes the previous plan that was filed in February 2014.
Board of Adjustment
The Board of Adjustment met on March 18, 2015. The next regular scheduled meeting of the
Board of Adjustment is scheduled for April 15, 2015. The following applications were con-
sidered:
V-15-05 1387 North DuPont Highway. 1387 DuPont Highway LLC, c/o Michael Hyansky —
Variance approval was granted by the Board of Adjustment from the requirements of Article 5 §4.7 of the
Zoning Ordinance pertaining to the number of signs allowed and the setback requirements for signage.
V-15-06 623 Fulton Street AVA Commercial LLC c/o Michael H. Harrington, Sr. - Variance ap-
proval was granted by the Board of Adjustment from the requirements of Article 6 § 3.6 and of the Zoning
Ordinance related to surfacing of parking areas and access drives.
Historic District Commission
The Historic District Commission did not meet on March 19, 2014. The next Historic District
Commission meeting is scheduled for April 16, 2015.
Page 90
COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
CDBG FY14 Projects
Homeownership Assistance Program
Five (5) clients have been approved for the Dover First Start Program and are mort-
gage ready. Each client has been approved for $20,000 in down payment assistance
to purchase eligible properties in the City of Dover. Five (5) clients have purchased
properties using the Dover First Start Program. One (1) client is mortgage ready
and under contract.
Dover Interfaith Mission for Housing
CDBG funds will be used for operations cost for the shelter. This project has been
completed.
NCALL Research
CDBG funds will be utilized for pre-purchase homeownership counseling services
for up to ten (10) Dover residents.
Elizabeth W. Murphey School
CDBG funds will be used for the roof replacements for one building on the campus
that services children that are at risk for homelessness. This project is completed.
Restoring Central Dover Initiative
NCALL has applied for the Implementation Grant for the Restoring Central Dover Initia-
tive.
Five (5) Year Consolidated Plan 2015-2019
The Parks, Recreation and Community Enhancement Committee recommended fund-
ing proposals for seven (7) applicants that will receive CDBG funding for the FY15-19
program years to carry out eligible CDBG projects within the City of Dover.
Mayors Challenge to End Veterans Homelessness
The Mayor’s Task Force for Ending Veterans Homelessness held a Boot Camp on March
2, 2015 at the Dover Public Library for housing providers that service the homeless to net-
work and develop an Action Plan to meet this challenge. There were over 50 housing pro-
viders in attendance to meet this challenge.
Page 91
Dangerous Buildings, Vacant Buildings & Demolitions
200 N. West Street—The owners met with City Staff and have obtained a renovations per-
mit. To date, the exterior of the property has been maintained, with renovations beginning
within the interior.
1370 College Road—The property was presented to the Dover City Council on October
25, 2014 as a dangerous building with the recommendation to have the structure demol-
ished. The owners of the property appealed before City Council that they wished to keep
the property and were willing to make all necessary repairs. City Council agreed with the
homeowners and gave them 6 months to make repairs.
5 Welch Drive—Notice was mailed to the lien holders to repair all code violations by De-
cember 21, 2014, or the property would be taken forward to City Council as a dangerous
structure. On February 9th, City Council declared the home dangerous and ordered the
owner to repair or demolish within 30 days. An asbestos survey was conducted at the site
with no asbestos found.
312 W. Loockerman Street—Notice was sent to the lien holders to make repairs to the va-
cant structure by January 6, 2015, or City Staff would schedule a date with Council to de-
clare the building dangerous and request to have the building demolished. On February
19th the City Historic District Commission ruled that Demolition by Neglect was occur-
ring and recommended the owner have 6 months to make repairs or to have the building
demolished. On March 9th City Council declared the building dangerous and the owner
was given until September 9, 2015 to repair or demolish the building.
363 Rita-Wilma Way—The two abandoned mobile homes on this lot have been con-
demned as unfit for human occupancy and boarded. The lien holders and the property
owner have been notified to make repairs or demolish the homes by December 29, 2014.
No repairs have been made to the homes, the structures were presented to City Council on
March 9, 2015. The owners were giving until May 9th to repair or demolish the struc-
tures.
110 Rustic Lane—This building was condemned by City Staff and the dangerous building
process has begun.
Vacant Buildings—During the month of March, thirty (30) additional buildings were reg-
istered as vacant, and $8,250.00 in vacant building registration fees were collected.
Page 92
Code Enforcement Activity—MARCH
Case Type # cases current # cases % staff ini ated % staff ini ated
month YTD current month YTD
No valid Rental Permit 16 21 88% 76%
No valid Building Permit 4 8 100% 100%
Tall grass and weeds 1 1 100% 100%
Unregistered vehicle 4 11 100% 100%
Abandoned vehicle 9 33 89% 79%
Annual Housing Inspec on 20 150 75% 89%
Property Maintenance – 65 126 52% 53%
Exterior
Electric Termina on 10 18 10% 33%
Dover Code of Ordinances 63 125 84% 80%
Zoning 6 15 33% 40%
Total Cases 198 508
Total # of Inspec ons For 258
Month
Page 93
Fire Marshal’s Office, Building Inspections & Licensing Summary
LIFE SAFETY July14‐Mar15 MAR 2014 July13‐Mar14
Inspec ons MAR 15 FYTD 15 MAR 14 FYTD 14
Annual Fire/Life Safety Inspec ons 49 309 33 124
Fire/Code/DCO Complaints 37 405 4 120
Inspec on Deficiencies from AFI 218 683 79 188
C/O & Acceptance Tests
14 96 1 11
Administra ve Walk Thru 15 77 ‐ ‐
Plan Review 22 ‐ ‐ ‐
Accidental $184,000 $205,700 $105,000 $6450.00
Incendiary
$3,000 $70,600 $0 $1100.00
Undetermined $2,000 $15,900 $90,000 $0
PERMITTING AND LICENSING
Permits Issued
MAR 15 FYTD 15 MAR 14 FYTD 14
Administra ve Permit 0 14 1 8
Building Addi on/Renova on Permits 37 312 26 274
Building Permits
10 129 10 119
Demoli on Permits
1 33 4 38
Fence Permits 3 62 8 51
Fire Preven on Permits 10 70 5 69
Mechanical Permits
22 219 26 277
Plumbing Permits
24 205 22 223
Sign Permits 30 176 28 174
Swimming Pool Permits
0 6 0 6
Business Licenses
39 966 29 1370
Merchant Licenses
2 204 3 302
Contractor Licenses
24 587 39 912
Lodging House Licenses
3 53 2 36
Mobile Homes
1 291 11 309
Public Occupancy 24 375 17 335
Rental Dwelling 223 3361 286 3098
BUILDING INSPECTIONS
Inspec ons MAR 15 FYTD 15 MAR 14 FYTD 14
Building
294 2858 250 667
Plumbing/Mechanical
259 2269 365 940
Cer ficate of Occupancy 14 125 8 31
Page 94
Fire Marshal’s Office—At a Glance
The Fire Marshal’s Office had a total
property loss/damage of approximately
$188,000.00 as a result of fire related
incidents in the City, which included a
juvenile arrest related to an attempted
arson.
Recreation Division
Enrollment Summary
March 2014 verses March 2015
60 0
50 0
40 0
30 0 FY14
20 0
10 0 FY15
0
General Re creation Sports Trips Leagues
Category FY14 FY15
General Recrea on 304 253
Sports 120 139
Trips 36 51
Leagues 330 79
Camps n/a n/a
Page 95
Revenue Breakdown: March 2015 verses March 2014
Gen era l R ecr eation General Recreation
Sp or ts Sports
Trip s Trips
L eag ues Leagues
B uildin g & Field R enta ls Building & Field Rentals
C am ps Camps
General Recreation $2,404.00 General Recreation $3,044.50
Sports $850.00 Sports $1,340.00
Trips $230.00 Trips $810.00
Leagues $8450.00 Leagues $8,100.00
Building & Field Rentals $850.00 Building & Field Rentals $2,777.50
Camps 160.00 Camps 140.00
Page 96
John W. Pitts Recreation Center – MARCH 2015
Total Program Attendance Facility Usage By The Hour
16,000
1,000
14,000
12,000
800
10,000 600
8,000 400
6,000
200
4,000
2,000 0 Mar 14
Apr 14
May 14
0 June 14
July 14
Aug 14
Sept 14
Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Oct 14
Nov 14
Dec 14
14 14 14 14 14 14 14 14 14 14 15 15 15
Jan 15
Feb 15
Mar 15
Facility Usage By The Hour MAR 15 FYTD 15 MAR 14 FYTD 14
Open Gym 457 3,491 474 3,689.5
Fitness Classes 41.5 360.5 75 508
Leagues 52.5 796.5 69 808
Camps 0 731.5 0 555
Sports Classes 53.5 222.5 44.25 189.75
Meetings & Rentals 20 312 37.5 261.5
Enrichment Classes 2 12 3.5 62.5
Total Facility Usage Hours 626.5 5,926 703.25 6,074.25
Daily Program Attendance** MAR 15 FYTD 15 MAR 14 FYTD 14
Total 3,505 49,588 3,190 44,101
Open Gym 902 4,634 707 4,072
Fitness Classes 238 2,397 432 2,959
Leagues 1,543 31,428 1,195 26,985
Camps 0 1,141 0 1,308
Sports Classes 433 2,123 415 1,852
Meetings & Rentals 477 7,820 426 6,795
Enrichment Classes 12 45 15 130
Since our opening in late April 2008, we have had 378,055 guests at the John W. Pitts Recreation Center.
March Open Gym Registrations and Packages Sold
Packages Sold: FEB MTD YTD FYTD
Daily: 56 $168 298 $882
Individual Quarterly: 1 $15 10 $150
Individual Annual: 1 $30 3 $130
Family Quarterly: 0 $0 3 $75
Family Annual: 0 $0_ 0 __ $0__
Revenue: $252 $1,024
Page 97
CITY OF DOVER
FINANCE AND PROCUREMENT & INVENTORY DEPARTMENTS
MARCH 2015 - MONTHLY BUDGET REPORTS
PLEASE NOTE – THIS REPORT PROVIDES TOP LINE INFORMATION ON THE OPERATING
FUNDS. IF YOU WOULD LIKE ADDITIONAL INFORMATION, PLEASE FEEL FREE TO
CONTACT THE FINANCE DEPARTMENT.
Page 98
CITY OF DOVER
ACTIVITY REPORTS
MARCH 2015
FINANCE DEPARTMENT ACTIVITY LEVELS
FY14 YTD FY15 YTD
BANK TRENDS
Number of Deposits Made (Hand, ACH & Wire, Lockbox) 4,764 5,272
Total Amount of All Deposits $ 97,739,220 $ 103,686,745
PAYROLL
Hours % Amount Hours % Amount
Gross wages per registers 623,333 100.0% $ 14,593,725 632,581 100.0% $ 15,052,755
Wages and Hours Worked
Regular 520,293 83.5% $ 11,255,932 516,737 81.7% $ 11,472,110
All over time 27,608 4.4% $ 1,111,801 25,621 4.1% $ 1,038,984
Other Paid or Unpaid Wages and Hours
Vacation 33,703 5.4% $ 877,690 33,959 5.4% $ 902,903
Sick 12,788 2.1% $ 325,789 14,654 2.3% $ 374,701
Terminal Leave - Retiree Vacation/Sick Payout 10,727 1.7% $ 339,954 16,523 2.6% $ 517,695
Comp Time 6,074 1.0% $ 169,763 6,351 1.0% $ 181,739
Personal 1,099 0.2% $ 31,047 1,367 0.2% $ 41,209
Leave Without Pay 3,801 0.6% $ - 2,757 0.4% $ -
Other (description below) 7,243 1.2% $ 481,713 14,623 2.3% $ 523,414
Other includes: pay adjustments, military differential pay, training, committee meetings, worker compensation tracking/adjustments, etc.
Other Activity
Number of Pay Periods 19 19
Number of Payroll Checks & Direct Deposits Issued 6,837 6,998
Number of Pension Checks Issued 2,310 2,281
Total Pension Benefits Paid - Defined Benefit Plan $ 3,881,713 $ 3,906,900
ACCOUNTS PAYABLE
Number of Check Vouchers 4,310 4,291
Number of EFT Vouchers 1,685 1,782
Vouchers Dollar Amount Disbursed $ 62,967,845 $ 61,572,689
PROCUREMENT & INVENTORY ACTIVITY LEVELS
Contingency & Warehouse Stock
$2,800,000
$2,700,000
$2,600,000
Total Dollar Value
$2,500,000
$2,400,000
$2,300,000
$2,200,000
$2,100,000
$2,000,000
Series2 Series3
Value: $2,757,850 Line Items: 1,434
Fuel Use
Unleaded: 10,622.4 gallons
Diesel: 6,688.0 gallons
Total Cost: $ 34,288
Page 99
City of Dover
Finance Department
Monthly Report – March 2015
General Fund Summary
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ 3,393,000 $ 4,361,500 $ - $ 4,361,500 0.0%
Revenues
Court of Chancery Fees 1,023,000 1,023,000 733,360 289,640 71.7%
Fines & Police Revenues 1,288,800 1,288,800 721,100 567,700 56.0%
Franchise Fees 636,000 636,000 341,133 294,867 53.6%
Grants 623,500 623,500 194,835 428,665 31.2%
Intrafund Services 4,863,000 4,959,300 3,486,252 1,473,048 70.3%
Library & Recreation Revenues 670,400 710,400 479,110 231,290 67.4%
Licenses & Permits 2,814,200 2,814,200 2,683,930 130,270 95.4%
Property Taxes (Includes BID Revenue) (1) 11,099,200 11,099,200 11,133,222 (34,022) 100.3%
Miscellaneous Revenues 93,900 93,900 57,103 36,797 60.8%
Sanitation Revenues 2,595,600 2,595,600 1,934,518 661,082 74.5%
Other Miscellaneous Revenues
Garrison Farm Rent Revenue 101,400 101,400 77,117 24,283 76.1%
Transfers-In from Special Funds & Utilities
Municipal Street Aid Fund 663,900 664,200 498,468 165,732 75.0%
2014 Revenue Bond Proceeds - - 475,000 (475,000) 0.0%
Civil Traffic Penalties 500,000 500,000 336,956 163,044 67.4%
Transfer Taxes 1,250,000 1,250,000 1,369,627 (119,627) 109.6%
Verizon, Contingency and CI Reserves 4,000 54,000 50,000 4,000 92.6%
Police Grants 124,000 124,000 39,878 84,122 32.2%
Water/Wastewater Fund 500,000 500,000 500,000 - 100.0%
Electric Fund 10,000,000 10,000,000 6,752,000 3,248,000 67.5%
Total Revenues 38,850,900 39,037,500 31,863,609 7,173,891 81.6%
Total Beginning Balance & Revenues $ 42,243,900 $ 43,399,000 $ 31,863,609 $ 11,535,391 73.4%
Expenditures
City Clerk & Council $ 489,800 $ 493,300 $ 327,685 $ 165,615 66.4%
Mayor, City Manager & Human Resources 1,047,100 1,056,300 673,631 382,669 63.8%
Police & Police Extra Duty 14,698,600 15,049,900 10,735,034 4,314,866 71.3%
Public Services 4,551,700 4,549,200 3,048,892 1,500,308 67.0%
Engineering 192,600 193,700 25,325 168,375 13.1%
Procurement & Inventory, Facilities Mgmt., Vehicle Maint. 1,990,100 2,030,000 1,473,595 556,405 72.6%
Planning & Inspections 2,192,400 2,241,900 1,543,224 698,676 68.8%
Finance, Info Tech & Customer Services 2,716,100 2,747,300 1,984,865 762,435 72.2%
Library & Recreation 2,099,500 2,132,800 1,482,600 650,200 69.5%
Fire Department 716,100 716,100 497,103 218,997 69.4%
Assessor 309,500 319,100 223,272 95,828 70.0%
Contribution to DDP 70,000 70,000 52,500 17,500 75.0%
Miscellaneous Grant Expense 25,000 25,000 - 25,000 0.0%
Other Employment Expenses 500,000 84,000 - 84,000 0.0%
Insurance 724,800 724,800 507,992 216,808 70.1%
OPEB - Retiree’s Health Care Contribution 1,636,500 1,636,500 1,218,250 418,250 74.4%
Police Pension Trust Contribution - State Grant 500,000 500,000 194,835 305,165 39.0%
Appropriation to Employee Pension Fund - Unfunded Liability - 543,000 181,000 362,000 33.3%
Appropriation to Police Pension Fund 655,000 755,000 527,500 227,500 69.9%
Street Lights 774,500 774,500 581,720 192,780 75.1%
Debt Service 708,600 708,600 942,985 (234,385) 133.1%
Transfers Out
Contingency - 300,000 300,000 - 100.0%
Capital Asset Reserve - 60,000 60,000 - 100.0%
Parkland Reserve - 25,000 25,000 - 100.0%
Uncollectible Reserve 50,000 50,000 50,000 - 100.0%
Capital Projects Fund 2,196,000 2,196,000 2,196,000 - 100.0%
Total Expenditures 38,843,900 39,982,000 28,853,008 11,128,992 72.2%
Budget Balance - Working Capital 3,400,000 3,417,000 - 3,417,000 0.0%
Total Budget Balance & Expenditures $ 42,243,900 $ 43,399,000 $ 28,853,008 $ 14,545,992 66.5%
Reserve Balances
Contingency $ 467,900 $ 719,200 $ 718,365
(1) Property Taxes are the taxes billed and not cash received. The outstanding receivable balance as of 3/31/15 is $286,254
as compared to $275,287 in March 2014.
Page 100
City of Dover
Finance Department
Monthly Report – March 2015
Water/Wastewater Fund Summary
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance - Water $ 658,400 $ 763,600 $ - $ 763,600 0.0%
Beginning Balance - Wastewater (98,500) 87,500 - 87,500 0.0%
Beginning Balance - Kent County Treatment 155,000 453,400 - 453,400 0.0%
714,900 1,304,500 - 1,304,500 0.0%
Revenues
Water Fees 4,616,400 4,616,400 3,570,248 1,046,152 77.3%
Wastewater Fees 3,706,800 3,706,800 2,773,987 932,813 74.8%
Kent County Treatment Fees 2,902,600 2,902,600 2,197,163 705,437 75.7%
Ground Water Inflow Adjustment 1,862,500 1,862,500 1,348,061 514,439 72.4%
Water Tank Leases 331,900 331,900 242,084 89,816 72.9%
Miscellaneous Service Fee 179,600 179,600 48,750 130,850 27.1%
Impact Fees - Water 472,700 427,900 233,459 194,441 54.6%
Impact Fees - Wastewater 427,900 472,700 207,673 265,027 43.9%
Total Revenues 14,500,400 14,500,400 10,621,425 3,878,975 73.2%
Total Beginning Balance & Revenues $ 15,215,300 $ 15,804,900 $ 10,621,425 $ 5,183,475 67.2%
Expenses
Water/Wastewater Operating Divisions
Engineering & Inspection $ 500,900 $ 502,400 $ 329,225 $ 173,175 65.5%
Water 485,300 488,600 276,770 211,830 56.6%
Water Treatment Plant 1,576,900 1,582,200 1,056,033 526,167 66.7%
Wastewater 974,100 974,700 578,651 396,049 59.4%
Construction 252,500 253,300 185,442 67,858 73.2%
Kent County Treatment 3,655,000 3,655,000 2,847,611 807,389 77.9%
Intrafund Service Fees 1,354,900 1,371,100 967,472 403,628 70.6%
OPEB - Retiree's Health Care Contributions 200,000 200,000 125,000 75,000 62.5%
Debt Service 1,152,000 1,152,000 805,348 346,652 69.9%
Other Employment Expenses 17,700 6,200 - 6,200 0.0%
Transfers Out
General Fund 500,000 500,000 500,000 - 100.0%
Water I & E Fund 1,200,000 1,200,000 900,000 300,000 75.0%
Wastewater I & E Fund 1,800,000 1,800,000 1,350,000 450,000 75.0%
Total Expenses 13,669,300 13,685,500 9,921,552 3,763,948 72.5%
Budget Balances
Budget Balance - Working Capital - Water 1,020,100 1,113,300 - 1,113,300 0.0%
Budget Balance - Working Capital - WW (739,200) (557,400) - (557,400) 0.0%
Budget Balance-Working Capital - KSA 1,265,100 1,563,500 - 1,563,500 0.0%
Total Budget Balances 1,546,000 2,119,400 - 2,119,400 0.0%
Total Budget Balances & Expenses $ 15,215,300 $ 15,804,900 $ 9,921,552 $ 5,883,348 62.8%
Reserve Balances
Contingency-Water $ 107,700 $ 106,500 $ 104,901
Contingency-Wastewater $ 194,800 $ 192,700 $ 189,689
Impact Fee Reserve - Sewer $ 1,552,300 $ 1,508,700 $ 1,463,362
Impact Fee Reserve - Water $ 203,900 $ 203,600 $ 200,489
Bond Coverage Ratio (Covenant 1.20) 4.29 4.29 4.37
Page 101
City of Dover
Finance Department
Monthly Report – March 2015
Electric Revenue Fund Summary
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ 9,253,600 $ 6,603,800 $ - $ 6,603,800 0.0%
Revenues
Sales to Customers 78,043,000 78,043,000 58,773,896 19,269,104 75.3%
Utility Tax 1,296,900 1,296,900 956,765 340,135 73.8%
Weyandt Hall Rents 200,000 200,000 139,924 60,076 70.0%
Miscellaneous Revenues 754,600 754,600 797,007 (42,407) 105.6%
Interest Earned 12,000 12,000 (577) 12,577 -4.8%
Transfer from Rate Stabilization 2,000,000 2,000,000 2,000,000 - 100.0%
Total Revenues 82,306,500 82,306,500 62,667,015 19,639,485 76.1%
Total Beginning Balance & Revenues $ 91,560,100 $ 88,910,300 $ 62,667,015 $ 26,243,285 70.5%
Expenses
Power Supply & Generation
Hedged Energy $ 21,823,000 $ 21,823,000 $ 19,777,676 $ 2,045,324 90.6%
Power Supply Management 996,000 996,000 747,000 249,000 75.0%
Capacity Charges 9,958,900 9,958,900 7,162,216 2,796,684 71.9%
Dover Sun Park Energy 2,067,600 2,067,600 1,117,278 950,322 54.0%
Solar Renewal Energy Credits 378,600 378,600 238,615 139,985 63.0%
PJM Charges - Energy 11,499,800 11,499,800 7,898,201 3,601,599 68.7%
PJM Charges - Transmission & Fees 7,234,100 7,234,100 4,207,227 3,026,873 58.2%
Total Power Supply 53,958,000 53,958,000 41,148,213 12,809,787 76.3%
Plant Operations 6,141,100 6,141,100 4,160,361 1,980,739 67.7%
Generation Fuels 1,611,100 1,611,100 1,668,791 (57,691) 103.6%
Capacity Credits (8,881,500) (8,881,500) (6,405,830) (2,475,670) 72.1%
PJM Spot Market Energy (2,232,800) (2,232,800) (2,388,055) 155,255 107.0%
PJM Credits (486,700) (486,700) (546,775) 60,075 112.3%
Total Generation (3,848,800) (3,848,800) (3,511,508) (337,292) 91.2%
Total Power Supply & Plant 50,109,200 50,109,200 37,636,705 12,472,495 75.1%
Electric Operating Divisions:
Transmission/Distribution 4,028,700 3,954,900 2,567,615 1,387,285 64.9%
Electrical Engineering 1,370,900 1,379,300 858,970 520,330 62.3%
Administration 636,600 632,400 412,249 220,151 65.2%
Meter Reading 267,600 357,200 261,361 95,839 73.2%
Systems Operations 686,300 696,500 493,002 203,498 70.8%
Intrafund Services 3,508,100 3,588,200 2,518,780 1,069,420 70.2%
Utility Tax 1,296,900 1,296,900 956,765 340,135 73.8%
OPEB Trust Contribution - Unfunded Liability 1,009,800 1,009,800 631,125 378,675 62.5%
OPEB - Retirees Health Care Contribution 513,300 513,300 320,813 192,487 62.5%
Interest on Deposits 20,000 20,000 12,949 7,051 64.7%
Green Energy Payment to DEMEC 130,000 130,000 97,885 32,115 75.3%
Accounts Receivable Write-Offs 200,000 200,000 200,000 - 100.0%
Other Employee Expenses 54,200 24,000 - 24,000 0.0%
Contractual Services RFP's 246,800 246,800 180,652 66,148 73.2%
Debt Service 3,297,000 3,297,000 2,554,714 742,286 77.5%
Transfers Out:
General Fund 10,000,000 10,000,000 6,752,000 3,248,000 67.5%
Electric Improvement & Extension Fund 4,750,000 4,750,000 2,975,000 1,775,000 62.6%
Inventory Reserve 175,000 175,000 175,000 - 100.0%
Total Expenses 82,300,400 82,380,500 59,605,585 22,774,915 72.4%
Budget Balance - Working Capital 9,259,700 6,529,800 - 6,529,800 0.0%
Total Budget Balance & Expenses $ 91,560,100 $ 88,910,300 $ 59,605,585 $ 29,304,715 67.0%
Reserve Balances
Contingency Reserve $ 826,000 $ 825,000 $ 820,429
Insurance Reserve $ 743,600 $ 742,800 $ 738,618
Rate Stabilization Reserve $ 8,583,000 $ 8,541,500 $ 8,482,724
Bond Coverage Ratio (Covenant 1.25) 1.95 1.93 2.70
Megawatt Hours Sold & Purchased
Sales to Customers MWh (excluding Street Light MWh) 712,390 712,390 544,244 76.4%
Sales per MWh $ 109.55 $ 109.55 $ 107.99 98.6%
Purchased/Generated MWh 741,522 741,522 571,623 77.1%
All In MWh Supply & Generation $ 67.58 $ 67.58 $ 65.84 97.4%
Page 102
City of Dover
Finance Department
Monthly Report – March 2015
General Capital Project Fund Summary
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance - Projects $ 117,100 $ 2,324,100 $ - $ 2,324,100 0.0%
Beginning Balance - Library $ - $ 330,500 $ - $ 330,500 0.0%
Revenues
State Grant - Other 153,000 208,000 15,000 193,000 7.2%
Interest Earnings - - 800 (800) 0.0%
Transfer from General Fund for Projects 2,196,000 2,196,000 2,281,000 (85,000) 103.9%
2014 Loan Proceeds - PD/Fire/Streets 3,579,400 3,593,300 683,100 2,910,200 19.0%
Income from Sale of Assets - - 67,462 (67,462) 0.0%
Transfer from Parkland Reserve - 104,000 104,000 - 100.0%
Total Revenues 5,928,400 6,101,300 3,151,362 2,949,938 51.7%
Total Beginning Balance & Revenue $ 6,045,500 $ 8,755,900 $ 3,151,362 $ 5,604,538 36.0%
Expenditures
Fire $ 827,300 $ 827,300 $ 526,617 $ 300,683 63.7%
Grounds Maintenance 68,100 86,700 65,947 20,753 76.1%
Recreation 146,000 284,400 150,123 134,277 52.8%
Police 499,100 601,700 478,427 123,273 79.5%
Streets 3,956,400 5,917,900 2,103,660 3,814,240 35.5%
Sanitation 256,500 256,500 - 256,500 0.0%
Procurement & Inventory - 55,000 35,737 19,263 65.0%
Loan Issuance Costs 75,000 61,100 60,668 432 99.3%
Transfer to Capital Asset Reserve - 330,500 330,500 - 100.0%
Transfer to Parkland Reserve 100,000 180,000 180,000 - 100.0%
Total Expenditures 5,928,400 8,601,100 3,931,679 4,669,421 45.7%
Budget Balance - Projects 117,100 154,800 - 154,800 0.0%
Total Budget Balance & Expenditures $ 6,045,500 $ 8,755,900 $ 3,931,679 $ 4,824,221 44.9%
Reserve Balances
Capital Asset Replacement Reserve $ 512,300 $ 914,000 $ 912,657
Parkland/Recreation $ 304,800 $ 320,700 $ 319,919
Page 103
City of Dover
Finance Department
Monthly Report – March 2015
Water/Wastewater Improvement & Extension Fund Summary
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance - Water $ 1,021,200 $ 7,588,800 $ - $ 7,588,800 0.0%
Beginning Balance - Wastewater $ 1,060,000 $ 5,500,400 $ - $ 5,500,400 0.0%
Revenues
Income from Sale of Assets - - 20,336 (20,336) 0.0%
Interest Earned 25,000 40,000 21,242 18,758 53.1%
Transfer from Operating Fund for Water 1,200,000 1,200,000 900,000 300,000 75.0%
Transfer from Operating Fund for Wastewater 1,800,000 1,800,000 1,350,000 450,000 75.0%
Transfer from Impact Fee Reserve - Wastewater 1,315,600 1,315,600 1,315,600 - 100.0%
Total Revenues 4,340,600 4,355,600 3,607,178 748,422 82.8%
Total Beginning Balance & Revenues $ 6,421,800 $ 17,444,800 $ 3,607,178 $ 13,837,622 20.7%
Expenses
Water $ 1,336,900 $ 7,526,500 $ 1,569,204 $ 5,957,296 20.8%
Wastewater 3,273,200 7,785,600 2,305,170 5,480,430 29.6%
Water Treatment Plant 38,100 38,100 33,771 4,329 88.6%
Total Expenses 4,648,200 15,350,200 3,908,145 11,442,055 25.5%
Budget Balance - Working Capital - Water 858,700 1,244,200 - 1,244,200 0.0%
Budget Balance - Working Capital - Wastewater 914,900 850,400 - 850,400 0.0%
Total Budget Balances 1,773,600 2,094,600 - 2,094,600 0.0%
Total Budget Balances & Expenses $ 6,421,800 $ 17,444,800 $ 3,908,145 $ 13,536,655 22.4%
Reserve Balances
Capital Asset Replacement - Water $ 522,700 $ 522,500 $ 514,570
Capital Asset Replacement - Wastewater $ 521,600 $ 519,100 $ 511,224
Page 104
City of Dover
Finance Department
Monthly Report – March 2015
Electric Improvement & Extension Fund Summary
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ 3,362,200 $ 5,942,500 $ - $ 5,942,500 0.0%
Revenues
Interest Earnings 24,800 24,800 (4,631) 29,431 -18.7%
Transfer from Electric Revenue Fund 4,750,000 4,750,000 2,975,000 1,775,000 62.6%
Income from Sale of Assets - - 24,347 (24,347) 0.0%
General Service Billing 250,000 250,000 95,045 154,955 38.0%
Total Revenues 5,024,800 5,024,800 3,089,761 1,935,039 61.5%
Total Beginning Balance & Revenues $ 8,387,000 $ 10,967,300 $ 3,089,761 $ 7,877,539 28.2%
Expenses
Electric Generation $ 2,240,000 $ 2,739,300 $ 1,361,545 $ 1,377,755 49.7%
Transmission/Distribution 1,033,000 1,804,200 695,101 1,109,099 38.5%
Electrical Engineering 1,663,100 2,800,200 599,407 2,200,793 21.4%
Total Expenses 4,936,100 7,343,700 2,656,053 4,687,647 36.2%
Budget Balance - Working Capital (Unaudited) 3,450,900 3,623,600 - 3,623,600 0.0%
Total Budget Balance & Expenses $ 8,387,000 $ 10,967,300 $ 2,656,053 $ 8,311,247 24.2%
Reserve Balances
Depreciation Reserve $ 9,998,200 $ 10,015,300 $ 9,930,658
Future Capacity Reserve $ 10,148,700 $ 10,136,900 $ 10,080,273
City of Dover
Finance Department
Monthly Report – March 2015
Community Transportation Improvement Fund
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ 78,900 $ 143,500 $ - $ 143,500 0.0%
Revenues
Grants Revenue 500,000 1,677,800 22,907 1,654,893 1.4%
Interest Earned 500 500 191 309 38.2%
Total Revenues 500,500 1,678,300 23,098 1,655,202 1.4%
Total Beginning Balance & Revenues $ 579,400 $ 1,821,800 $ 23,098 $ 1,798,702 1.3%
Expenses
Program Expenses - Del Dot $ 500,000 $ 1,677,800 $ 41,489 $ 1,636,311 2.5%
Total Expenses 500,000 1,677,800 41,489 1,636,311 2.5%
Budget Balance - Working Capital 79,400 144,000 - 144,000 0.0%
Total Budget Balances & Expenses $ 579,400 $ 1,821,800 $ 41,489 $ 1,780,311 2.3%
Page 105
City of Dover
Finance Department
Monthly Report – March 2015
Police Grant Funds
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ 77,200 $ 172,100 $ - $ 172,100 0.0%
Revenues
Grants Received 339,000 436,400 243,077 193,323 55.7%
Interest Earned - - 599 (599) 0.0%
Total Revenues 339,000 436,400 243,676 192,724 55.8%
Total Beginning Balance & Revenues $ 416,200 $ 608,500 $ 243,676 $ 364,824 40.0%
Expenses
Cadet Program $ - $ 17,900 $ - $ 17,900 0.0%
Program Expenses/Supplies 156,000 317,900 77,189 240,711 24.3%
Computer Hardware 50,000 47,800 10,793 37,007 22.6%
Telephone/Fax 15,000 15,000 10,570 4,430 70.5%
Training/Conference/Food/Travel 32,000 45,000 6,211 38,789 13.8%
Consulting/Audit Fees 1,000 1,000 737 263 73.7%
Contractual services 6,000 10,200 3,389 6,811 33.2%
Operating Transfers - Out 124,000 124,000 39,878 84,122 32.2%
Total Expenses 384,000 578,800 148,767 430,033 25.7%
Budget Balance - Working Capital (Unaudited) 32,200 29,700 - 29,700 0.0%
Total Budget Balances & Expenses $ 416,200 $ 608,500 $ 148,767 $ 459,733 24.4%
Page 106
City of Dover
Finance Department
Monthly Report – March 2015
Library Grant Fund
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ 17,300 $ 44,800 $ - $ 44,800 0.0%
Revenues
Grants Received 274,100 281,400 281,313 87 100.0%
Total Revenues 274,100 281,400 281,313 87 100.0%
Total Beginning Balance & Revenues $ 291,400 $ 326,200 $ 281,313 $ 44,887 86.2%
Expenses
Program Expenses/Supplies-State Grants $ 28,000 $ 29,900 $ 20,935 $ 8,965 70.0%
Program Expenses/Supplies-Federal Grants - 2,500 2,500 - 100.0%
Office Supplies 24,000 28,000 14,525 13,475 51.9%
Printing/Duplicating 8,900 14,000 6,370 7,630 45.5%
Postage 100 100 36 64 36.0%
Books 128,900 132,600 83,194 49,406 62.7%
Furniture 2,000 15,100 6,318 8,782 41.8%
Audio Visual Supplies 74,000 75,100 43,028 32,072 57.3%
Training/Conference/Food/Travel 3,500 3,500 2,540 960 72.6%
Contractual Services - 900 - 900 0.0%
Office Equipment/Repairs & Maintenance 2,000 6,000 4,547 1,453 75.8%
Other Equipment - Purchases 2,700 1,200 1,052 148 87.7%
Total Expenses 274,100 308,900 185,045 123,855 59.9%
Budget Balance - Working Capital 17,300 17,300 - 17,300 0.0%
Total Budget Balances & Expenses $ 291,400 $ 326,200 $ 185,045 $ 141,155 56.7%
City of Dover
Finance Department
Monthly Report – March 2015
CJC Grants/Aid
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ - $ - $ - $ - 0.0%
Revenues
Grants Received 31,800 31,800 10,549 21,251 33.2%
Total Revenues 31,800 31,800 10,549 21,251 33.2%
Total Beginning Balance & Revenues $ 31,800 $ 31,800 $ 10,549 $ 21,251 33.2%
Expenses
Contractual Services $ 31,800 $ 31,800 $ 10,549 $ 21,251 33.2%
Total Expenses 31,800 31,800 10,549 21,251 33.2%
Budget Balance - Working Capital (Unaudited) - - - - 0.0%
Total Budget Balances & Expenses $ 31,800 $ 31,800 $ 10,549 $ 21,251 33.2%
Page 107
City of Dover
Finance Department
Monthly Report – March 2015
After School Program/Substance Abuse Prevention Fund
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ 41,000 $ 41,000 $ - $ 41,000 0.0%
Revenues
Grants Received 55,600 55,600 21,023 34,577 37.8%
Recreation Revenue 33,000 33,000 26,879 6,121 81.5%
Total Revenues 88,600 88,600 47,902 40,698 54.1%
Total Beginning Balance & Revenues $ 129,600 $ 129,600 $ 47,902 $ 81,698 37.0%
Expenses
Temporary Help/Benefits $ 54,000 $ 54,000 $ 26,386 $ 27,614 48.9%
Program Expenses/Supplies 55,600 55,600 22,571 33,029 40.6%
Total Expenses 109,600 109,600 48,957 60,643 44.7%
Budget Balance - Working Capital (Unaudited) 20,000 20,000 - 20,000 0.0%
Total Budget Balances & Expenses $ 129,600 $ 129,600 $ 48,957 $ 80,643 37.8%
City of Dover
Finance Department
Monthly Report – March 2015
CDBG Fund
Revised 75%
Budget Budget YTD Balance Budget
Beginning Balance $ - $ 2,100 $ - $ 2,100 0.0%
Revenues
Grants Received 235,000 284,200 188,867 95,333 66.5%
Interest Earnings - - 77 (77) 0.0%
Total Revenues 235,000 284,200 188,944 95,256 66.5%
Total Beginning Balance & Revenues $ 235,000 $ 286,300 $ 188,944 $ 97,356 66.0%
Expenses
Closing Cost/Down Payment Program $ 102,800 $ 103,000 $ 95,000 $ 8,000 92.2%
Dover Interfaith Ministry 27,500 27,500 24,720 2,780 89.9%
MHDC Emergency Home Repair - 100 28 72 28.0%
First State RC&D - 1,900 1,853 47 97.5%
Elizabeth W Murphy School 50,000 51,200 26,500 24,700 51.8%
NCALL Research Inc. 7,700 10,000 3,500 6,500 35.0%
Milford Housing H/O Rehabilitation - 3,000 2,933 67 97.8%
Salaries 47,000 87,500 33,619 53,881 38.4%
NSP Expense - - 674 (674) 0.0%
Total Expenses 235,000 284,200 188,827 95,373 66.4%
Budget Balance - Working Capital - 2,100 - 2,100 0.0%
Total Budget Balances & Expenses $ 235,000 $ 286,300 $ 188,827 $ 97,473 66.0%
Page 108
Monthly Report
March 2015
Economic Development Office
Page 109
2015_3 Economic Development
Calpine Bi-weekly Conference Call
Teleconference with President of Air Base Carpet regarding sign issues
Forwarded an information packet to Greg Pettinaro regarding Downtown Development
District
Arranged for lighting repair at E-ZPass
Weekly Downtown Development District progress meeting with Mayor and City
Manager
Met with Bryant Bell from Delaware State University to provide overview and tour of
GOTP
Met with Theresa Owens from Rouge to provide overview of DDD program
Met with Ron Miller, Commercial Lender for WSFS, provided overview of DDD
Reviewed tree clean-up proposal from Eastern Shore Natural Gas with Calpine
Attended Greater Kent Committee meeting
Attended Kent County is Open for Business
Attended HSCA advisory group meeting
Met with Colonial Investment to discuss parking issues
Set-up meeting with Mike Marasco to discuss purchase of 108 W Loockerman St
Attended Chamber of Commerce Board Meeting
Meeting with Richard Sinegar from DelDot to discuss North Street Improvement Grant
Attended LEADS Group meeting at R&R Commercial Realtors
Met with owner of Snyder’s Candy to discuss second location in Dover
Attended DDD workshop
Attended CDCC Legislative Luncheon
Attended NCALL meeting and provided a DDD update
Attended local Kiwanis meeting and provided overview of DDD
Met with Sydney Artz to discuss DDD
Meeting with Dave Sweeney from Advantech to discuss possibility of relocating
Advantech within the city limits
Met with Rebecca Kidner to discuss incentive package for new building
Requested an amortization schedule from Jeff Buckworth on Acme and E-ZPass
buildings to be included in the DDP Budget
Attended DEED meeting
Attended GOTP progress meeting
Meeting with Kirby Hudson and Mosaic Group to discuss redevelopment of the Acme
building
Page 110
Meeting with Gerri Street to review the DDP Budget
Walking tour with Pettinaro Group to show downtown properties
Attended Honorary Commander briefing
Attended Kent County Plant Managers Meeting
Attended Kent County Tourism Board Meeting
Teleconference with Dave Moore, president of Milford Housing Development
Corporation
Met with insurance inspector to review insurance loss control of DDP properties
Meeting with Philipp Utz to discuss construction timeline concerns
Attended Food Innovation District Meeting
Toured Advantech headquarters with Kirby Hudson
Meeting with James White and representatives from First State Community Loan Fund
to review DDD and incentives
Met with Mike Marasco to discuss downtown incentives and tour 108 W Loockerman
Toured the downtown with Bob Cipriati, owner of A Touch of Italy, to discuss potential
for locating a restaurant in downtown
Worked with city Public Works department to have water leak repaired to the fire
suppression system in Acme
Attended Main Street Conference in Atlanta (March 29 through April 1)
Measures:
1 Maintain an unemployment rate for the City of Dover that is lower than national
and state averages
2012-2013 Actual 2013-2014 Actual 2014 - 2015 Actual
Results <10% unemployment rate < 10% unemployment rate <10% unemployment rate
in June 2013 in June 2014 in July 2015
7.5% - US Rate 6.1 % - US Rate 5.5 % - US Rate
6.9% - DE Rate 6.9 % - DE Rate 4.6 % - DE Rate
8.9% - City of Dover Rate 8.3% - City of Dover Rate 6.0% - City of Dover Rate
June 2013 Actual June 2014 Actual February 2015 Actual
Page 111
2 Monitor number of contacts with small businesses and with out-of-town
companies interested in locating in Dover
2012-2013 Actual 2013-2014 Actual 2014 - 2015 Actual
Results ≥20 contacts with potential >20 contacts with potential >20 contacts with potential
small businesses; small businesses; small businesses;
18 contacts YTD 23 Contacts YTD 16 Contacts YTD
≥11 contacts with out-of- >11 contacts with out-of- >11 contacts with out-of-
town companies interested town companies interested town companies interested
in locating in Dover in locating in Dover in locating in Dover
7 Contacts YTD 13 Contacts YTD 12 Contacts YTD
2015_3 Downtown Dover Partnership
Provided technical assistance to three (3) prospective small business individuals on
overall business development within the Downtown Dover Business District
Continued providing technical assistance to three (3) prospective small business
individuals on locating available space within the downtown district to lease
Provided thirteen (13) hours of Technical Assistance to merchants located in the
Downtown Business Corridor
Coordinated media (newspaper announcements), website and social media press
releases of the scheduled March First Friday in downtown Dover
Coordinated media (newspaper announcements), website and social media press
releases for St. Patrick’s Day Parade
Coordinated logistics (Work Orders) for the St. Patrick's Day Parade scheduled for March
14. Parade canceled due to rain
Met with Rick Hill to discuss the development of the DDP Annual Report.
Met with Rick Hill to discuss the development of Pocket Recruitment Folder Project
Telephone conference with Michael Finkelstein on March 3 to discuss the Downtown
Development District Program
Attended the Foundation for a Better Tomorrow Award Celebration at A Center for
Mental Wellness on March 9th
Telephone conference with Mike Marasco, Small Business Owner, to discuss vacant
buildings in downtown
Met with Jacqueline Reyes, Independent Resources, Inc., to discuss the scheduled
Annual Dolphin Tank Ceremony on March 12th
Uploaded and posted the Downtown Development District information on the DDP
Website
Assisted Serena Stachecki from Artsy Fartsy Crafts Store with preparation and
dissemination of the Artsyfest’ 15 Event on March 24th
Page 112
Assisted the Schwartz Center with coordinating the Rebirth of the Schwartz Center
Parade on March 19th
Assisted Brandon Cohen with completing the Special Event Permit for the History,
Heritage & Hops Event scheduled for May 16th
Completed the first draft of Parking Committee Annual Downtown Dover Safety &
Security Survey’ 15
Disseminated the “Prevention Works – 2015 Alcohol Prevention Month Mini Grant”
information to our Non Profit Agencies within the downtown Business Corridor
Disseminated the “Certified Prevention Specialist Scholarship” Announcement to our
Non Profit Agencies within the downtown Business Corridor
Conducted and completed the Parking Survey of the downtown Parking Lots during the
month of March
Attended the DDP Marketing/Promotion Committee meeting
Met with Tami Wilson from Delaware Parents Association to discuss the Community
Block Party scheduled for May 9th
Attended the DDP Board of Directors Meeting
Attended the DDP Merchant’s Meeting
Attended the Restoring Central Dover Steering Committee Meeting to discuss grant
program updates
Met with Gary Chaffee, DDP Volunteer Parade Coordinator, to discuss parade line up for
the scheduled March 14th St. Patrick’s Day Parade
Met with Amy Mullen, DDP Volunteer Farmer’s Market Manager, to discuss Projected
Expenses for Farmer’s Market Program' 15
Page 113
Dover Police Department
Monthly Report
To
Mayor and City Council
“To Protect and Serve”
March 2015
Page 114
DEPARTMENT OF POLICE
Paul M. Bernat 400 South Queen Street
Chief of Police Dover, Delaware 19904
F.B.I.N.A. 302-736-7111
Fax: 302-672-1842
May 11, 2015
Honorable Robin Christiansen, Mayor
Members of Dover City Council
City Hall
Dover, DE 19901
Mayor Christiansen and Council Members:
The following is the monthly report for Dover Police Department activities for the month of March 2015: Please
note that starting with this month’s report; we are including the statistics for Tier 1, 2, & 3 Sex Offender
Notifications.
COMPLAINTS
Total complaints received through March 31, 2015, numbered 8,096; this is an increase of 450 complaints over the
same time period last year.
8,601
9,000 8,095 8,096
7,410 7,646
7,000
5,000
3,000
1,000
2011 2012 2013 2014 2015
25 22
21 20 Cases Reported in
20 March
15
CRIMINAL INVESTIGATIONS
Cases Cleared in
March
10 7
2 2
5 2 0 Cases Cleared from
0 Previous Months
0
Burglary Robbery Rape
Page 115
Report to Mayor and Council
March 2015
Page 3
COMMUNITY POLICING/QUALITY OF LIFE SECTION
ENFORCEMENT ACTION Contacts
ABANDONED VEHICLES 0
ALCOHOL VIOLATIONS/DUI’S 0
ASSIST OTHER 0
WARRANTS ON FILE 1
BIKE ON SIDEWALK 0
CITY PARK VIOLATIONS 0
CRIMINAL ARRESTS 0
DRUG RELATED ARRESTS 0
LOUD MUSIC 0
MISCELLANEOUS VIOLATIONS 2
PARKING VIOLATIONS 10
PEDDLER 0
MEETINGS 102
PROSTITUTION 0
COLLECTION OF DELINQUENT 0
DCO’S
WANTED CHECKS/CPC’S 0
TRAFFIC ARRESTS 0
WARNINGS 0
FUGITIVE 0
TOTAL CONTACTS 115
TRAFFIC ARRESTS
6,000 5,087
The department issued 3,395 traffic citations 4,499
5,000
through this reporting period. This is a decrease of 3,797 3,833
438 citations over the number issued during the 3,395
4,000
same period last year.
3,000
2,000
1,000
0
2011 2012 2013 2014 2015
TRAFFIC CRASHES
Through March 31st, Dover Police investigated 442 600 483 467 499
traffic crashes. This is a decrease of 57 crashes 447 442
500
investigated during the same period last year.
400
300
200
100
0
2011 2012 2013 2014 2015
Page 116
Report to Mayor and Council
March 2015
Page 4
911 CENTER
During the month of March, the Dover Police
Department handled a total of 9,164 calls
27% averaging 296 calls per day. Dispatchers
handled 2,428 calls on the 911 wireless lines, 563
calls on the 911 landlines, and 186 calls on the
911 Wireless
Voice Over Internet Protocol lines, the remaining
911 Landline
5,987 were administrative calls.
VolP
65% 6%
2% Administrative
CITY ORDINANCE SUMMONS
2,500
Through March 31st, we issued 1,659 city
ordinance summons, an increase of 32 2,000
summonses over the same period last year.
1,500
*Note: Of those summonses issued in
March, 62 DCO’s were issued for 1,000
handicapped parking violations, 12 for fire
lane parking violations, 62 for false alarms 500
(0, for 1-2, 33, for 3-5 alarms, 12, for 6-9 0
alarms, 7, for 10-15 alarms, and 10, for 16 2011 2012 2013 2014 2015
or more alarms) and 5 for noise violations ISSUED 2,190 1,976 1,789 1,627 1,659
(1 for vehicle violations and 4 for PAID 1,465 1,792 1,023 885 1,053
residence violations).
ISSUED PAID
Page 117
Report to Mayor and Council
March 2015
Page 5
SEX OFFENDER STATISTICS/MARCH
YEARLY NON COMPLIANT
VERIFICATIONS NOTIFICATIONS
REVERIFICATIONS WARRANTS
TIER 1 0 0 0 1
TIER 2 17 1564 39 0
TIER 3 9 1306 18 0
ACTIVE SEX OFFENDERS THAT RESIDE IN THE CITY OF DOVER (please note, Tier 1 offenders are not
contacted by Dover Police Sex Offender Agents).
TIER 2 184
TIER 3 76
TOTAL 260
Please see below for a description of each of the three (3) tiers.
Tier 1
Tier 1 offenders are the least serious offenders. They are only required to respond to SBI and update their
information once a year in the month that is set at the time of their registration. They are not contacted and no
community notifications are done. If a tier 1 offender fails to respond during their verification month, Dover PD sex
offender agents are contacted to contact the offender and make sure they comply or obtain a warrant if necessary.
Tier 2
Tier 2 offenders are mid-level offenders. They are re-verified twice a year. If their residence, work place or school is
within the city limits of Dover, each location is verified to make sure the offender still lives, works or goes to school
at the location that appears on their registry paperwork. Notifications consist of e-mail notifications to all schools,
daycares and any other person who is subscribed to the Dover PD web page.
Tier 3
Tier 3 offenders are the most serious offender. They are verified the same as tier 2 offenders except that verification
occurs every three months. Also, in addition to e-mail notifications, community notification flyers are distributed in
the neighborhood in which the offender resides.
Offenders are required to re-register at SBI within three days of a change address. Warrants are obtained for any
offender who fails to do so.
Offenders cannot reside within 500 ft of a school (college excluded) or within 500 ft of a commercial daycare.
Any other restrictions that an offender may have, such as contact with children or computer access, are set by
probation and are on a case by case basis. There are probation officers that are assigned to monitor sex offenders and
make sure any restrictions they have are adhered too.
Please visit our website at www.doverpolice.org for up to date information on crimes and activities in the City of
Dover.
Respectfully Submitted,
Paul M. Bernat
Chief of Police
Page 118
City of Dover
Capital Investment Plan
Project Tracking Report
Quarterly Report as of Mar 31, 2015
Points to Remember -
* Original Project Budget = Original Total Project Budget initially included in approved annual budget.
* Latest Project Budget = Revised Total Project Budget included in most recent approved annual budget or one of the following:
bond resolution, revolving fund loan agreement, Council approved budget amendment, or City Manager approved amendment as per
the Budget Amendment Procedure.
* Current Fiscal Year - Revised Fiscal Year Budget = Current Year approved project budgets plus carry forward balances of unspent
budgets in the prior fiscal year. Project Carry Forward balances will be submitted to City Council for amendment in January 2010.
Can also be amended with City Manager approval per the Budget Amendment Procedure.
* Water Quality, Inflow/Infiltration, Distribution Upgrades and New Development projects are budgeted as a blanket project and once
individual projects are identified and estimated they are created using an allocation of the overall budgeted amount.
* Status and Comments provided by City Manager.
Community Water & Total
Current Year Budget Funding Sources General Transportation Wastewater Electric CIP
Budget Balance $ 1,989,300 $ - $ 10,994,600 $ 2,318,900 $ 15,302,800
General Billings for Reimbursement of Expense - - - 250,000 250,000
Debt Financing 3,532,200 - - - 3,532,200
Other State/Federal Grants 208,000 - - - 208,000
State Community Transportation Funds - 1,677,800 - - 1,677,800
Transfer from WW Impact Fee Reserve - - 1,315,600 - 1,315,600
Transfer from General Fund 2,196,000 - - - 2,196,000
Transfer from Operating Funds - - 3,000,000 4,750,000 7,750,000
Transfer from Parkland Reserve 104,000 - - - 104,000
Interest Income - - 40,000 24,800 64,800
Total Funding Sources (Unaudited) $ 8,029,500 $ 1,677,800 $ 15,350,200 $ 7,343,700 $ 32,401,200
Page 119
City of Dover
General Fund - Major CIP Projects
Quarterly Report as of Mar 31, 2015
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Original Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Year Fiscal Year YTD Budget Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Balance Spent Status Comments
1 FY 2013
2 ST1304 M B/L Garrison Farm Improvements $ 1,924,000 $ 4,600,000 $ 2,044,853 $ 2,555,147 44.5% $ 2,600,000 $ 4,226,700 $ 1,671,542 $ 2,555,158 39.5% In Process Project approximately 55% complete
3 Totals - FY 2013 $ 1,924,000 $ 4,600,000 $ 2,044,853 $ 2,555,147 44.5% $ 2,600,000 $ 4,226,700 $ 1,671,542 $ 2,555,158 39.5%
4
5 FY 2014
6 --- Equipment (Sprayer) $ 18,600 $ 18,600 $ - $ 18,600 0.0% $ - $ 18,600 $ - $ 18,600 0.0% In Process 30 Gallon Sprayer
7 CS1402 G Security Cameras/Fence 55,000 55,000 35,737 19,263 65.0% - 55,000 35,737 19,263 65.0% Complete Final bills to be paid in April
Awaiting warm weather to test system
8 PR1401 A/C System @ Pitts Center 65,000 104,000 46,800 57,200 45.0% - 104,000 46,800 57,200 45.0% In Process for acceptance
9 PR1402 G Schutte Park Land Improvement 30,000 49,700 49,700 0 100.0% - 48,300 48,276 24 99.9% Complete
10 PR1403 G Demolition @ White Oak Park - 70,500 59,452 11,048 84.3% - 66,100 55,047 11,053 83.3% In Process
Contractor to re-mobilize in late April
11 ST1402 Concrete Program 70,000 45,500 3,937 41,563 8.7% - 42,300 702 41,598 1.7% In Process to complete project
12 ST1403 B/L FY 2014 Bonded Street Program 570,869 522,969 505,430 17,539 96.6% - 60,700 150 60,550 0.2% Complete
13 ST1403 B/L Pear Street 126,100 126,100 123,133 2,967 97.6% - 126,100 123,133 2,967 97.6% Complete
ST1403 B/L WQI - Rt 13 Water Main 43,000 43,000 43,031 (31) 100.1% - 43,000 43,031 (31) 100.1% Complete
14 ST1404 Village of Westover IV 129,400 129,400 64,186 65,214 49.6% - 129,400 64,186 65,214 49.6% Complete
15 Totals - FY 2014 $ 1,107,969 $ 1,164,769 $ 931,406 $ 233,363 80.0% $ - $ 693,500 $ 417,062 $ 276,438 60.1%
16
17 FY 2015
18 --- Vehicles & Equipment $ 673,100 $ 673,100 $ 247,171 $ 425,929 36.7% $ 673,100 $ 673,100 $ 247,171 $ 425,929 36.7% In Process
19 --- 800 MHZ Radio Replacement - Police 329,500 329,500 329,450 51 100.0% 329,500 329,500 329,450 51 100.0% Complete
20 FR1500 Annual Contribution to Robbins Hose 238,500 238,500 237,965 535 99.8% 238,500 238,500 237,965 535 99.8% Complete
21 FR1501 SCBA Equipment/Radios 588,800 588,800 288,651 300,149 49.0% 588,800 588,800 288,651 300,149 49.0% In Process Equipment has been ordered
22 PR1501 50%G Park & Playground Impr Equipment 66,000 66,000 - 66,000 0.0% 66,000 66,000 - 66,000 0.0%
Awaiting completion of needs
23 PR1502 Dover Park Improvement 80,000 - - - 0.0% 80,000 - - - 0.0% Deferred assessment. Put in Reserve for now.
Staff working on final spec for
24 ST1501 Salt Storage Barn 50,000 75,000 - 75,000 0.0% - 75,000 - 75,000 0.0% In Process concrete
Patching structure
contract awarded, concrete
work underway. Street project to
25 ST1502 Streets, Alleys and Concrete Prog. 900,000 644,400 88,343 556,057 13.7% 900,000 644,400 88,343 556,057 13.7% In Process Council April 27th.
26 ST1503 Misc Emergency Street/Storm Repairs 75,000 75,000 54,573 20,427 72.8% 75,000 54,573 20,427 72.8% In Process Project ongoing
Design work occuring, awaiting
27 ST1504 G Old PW2 Site Improvements 150,000 150,000 44,733 105,267 29.8% 150,000 150,000 44,733 105,267 29.8% In Process invoices
Assessment of valve complete,
28 ST1505 Silver Lake Dam Inspection 51,400 51,400 14,905 36,495 29.0% 51,400 51,400 14,905 36,495 29.0% In Process awaiting invoice.
Awaiting revised proposal from Kent
29 ST1506 Stormwater Ditch Maintenance 15,000 15,000 - 15,000 0.0% 15,000 15,000 - 15,000 0.0% In Process Conservation District.
Bid has been awarded, awaiting
30 ST1507 Buttner Place Flooding Design - 10,000 - 10,000 0.0% 10,000 9,148 853 91.5% In Process mobilization date.
31 ST1508 G Stormwater Utility Planning 90,000 90,000 - 90,000 0.0% 90,000 90,000 - 90,000 0.0% In Process Project underway, awaiting invoices.
32 CS1502 12 Additional Security Cameras 102,600 102,600 - 102,600 0.0% 102,600 102,600 - 102,600 0.0% In Process Cameras have been ordered
33 $ 3,409,900 $ 3,109,300 $ 1,305,790 $ 1,803,510 42.0% $ 3,284,900 $ 3,109,300 $ 1,314,938 $ 1,794,362 42.3%
34
35 Grand Totals $ 6,441,869 $ 8,874,069 $ 4,282,049 $ 4,592,020 48.3% $ 5,884,900 $ 8,029,500 $ 3,403,542 $ 4,625,958 42.4%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
G = Grant funded project
B/L = To be financed through bonds or commercial loan.
Page 120
City of Dover
Community Transportation - Major CIP Projects
Quarterly Report as of Mar 31, 2015
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Original Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Year Fiscal Year YTD Budget Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Balance Spent Status Comments
1 FY 2009 - FY 2013
2 CT0212 South Street Paving $ 80,400 $ 42,200 $ 42,198 $ 2 100.0% $ - $ - $ - $ - 0.0% Complete Remaining funds transferred to CT1562
3 ST0232 Pat Lynn Drive/D.H.S. Storm Drain Pipe 155,200 190,300 184,778 5,522 0.0% - 5,500 - 5,500 0.0% Complete Unused funds still available
4 CT0555 Little League Parking Lot paving 11,600 - - - 0.0% - - - - 0.0% Complete Remaining funds transferred to CT1562
5 TE0601 M Lincoln Park Center 900,000 1,423,500 523,277 900,223 36.8% - 900,200 - 900,200 0.0% In Process On-going
6 CT0708 E Water Street Brick 65,000 65,000 - 65,000 0.0% - 65,000 - 65,000 0.0% Specialty contract needed
7 CT0977 Schutte Park Parking Lot 22,000 - - - 0.0% - - - - 0.0% Complete Budget transferred to CT1562
8 CT1201 North Street Roundabout 500,000 572,200 572,205 (5) 100.0% - 17,800 17,840 (40) 100.2% Complete
Funds transferred to concrete project, which is
9 CT1317 Wesley College Phase II 148,600 148,600 119,241 29,359 80.2% - 29,400 - 29,400 0.0% In Process underway, awaiting invoices
10 CT1369 Bayard Ave (Orchard Av & Morris Dr) 24,700 24,700 3,396 21,304 13.7% - 24,700 3,396 21,304 13.7% Complete Awaiting final invoice
11 Totals - FY 2009 - FY 2013 $ 1,907,500 $ 2,466,500 $ 1,445,095 $ 1,021,405 58.6% $ - $ 1,042,600 $ 21,236 $ 1,021,364 2.0%
12
13 FY 2014
14 CT1405 Lakeview Drainage Study $ 24,400 $ 24,400 $ 12,840 $ 11,560 52.6% $ - $ 24,400 $ 12,840 $ 11,560 52.6% In Process Working with homeowner to obtain easement.
Bids have been received, going to Council on April
15 CT1412 Inner City Cultural League - S. West St. 38,400 38,400 - 38,400 0.0% - 38,400 - 38,400 0.0% 27th for review.
Project complete, presentation to Legislators in
16 CT1490 Persimmon Park Place Planning Study 600 6,000 2,346 3,654 0.0% - 6,000 2,346 3,654 39.1% Complete May.
17 Totals - FY 2014 $ 63,400 $ 68,800 $ 15,186 $ 53,614 22.1% $ - $ 68,800 $ 15,186 $ 53,614 22.1%
18
19 FY 2015
Contractor scheduled to mobilize around April
20 CT1542 Loockerman Plaza $ 42,600 $ 42,600 $ - $ 42,600 0.0% $ 42,600 $ 42,600 $ - $ 42,600 0.0% In Process 20th.
21 CT1551 Townsend Blvd Striping 5,100 5,100 5,067 33 99.4% 5,100 5,100 5,067 33 99.4% Complete
Project underway. Phase 1 complete, started
22 CT1562 Village of Cannon Mill Repavement 315,000 386,900 - 386,900 0.0% 315,000 386,900 - 386,900 0.0% In Process Phase II
23 CT1571 Solid Rock Church 25,000 25,000 - 25,000 0.0% 25,000 25,000 - 25,000 0.0% In Process Purchase order provided to contractor
24 CTxxxx Unapplied CT Projects (placeholder) 500,000 500,000 - 500,000 0.0% 112,300 106,800 - 106,800 0.0% Future CT Agreements
25 Totals - FY 2015 $ 887,700 $ 959,600 $ 5,067 $ 954,533 0.5% $ 500,000 $ 566,400 $ 5,067 $ 561,333 0.9%
26
27
28 Grand Totals $ 2,858,600 $ 3,494,900 $ 1,465,348 $ 2,029,552 41.9% $ 500,000 $ 1,677,800 $ 41,489 $ 1,636,311 2.5%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
C = Project funded by combination of CT Funds and General Fund
Page 121
City of Dover
Water/Wastewater Improvement & Extension Fund - Major CIP Projects
Quarterly Report as of Mar 31, 2015
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Original Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Year Fiscal Year YTD Budget Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Balance Spent Status Comments
1 FY 2008 - FY 2013
Staff working on a memorandum of understanding with
2
WD0804 M 1.0 MG Elevated Water Storage $ 4,196,600 $ 2,556,000 $ 87,827 $ 2,468,173 3.4% $ - $ 2,470,700 $ 2,500 $ 2,468,200 0.1% In Process owner of property
Staff working to abandon old Well 12 with remaining
3
WD0805 M Piney Point Well 398,800 1,096,200 1,093,212 2,988 99.7% - 3,000 - 3,000 0.0% Complete funds
4 WW1010 I Tar Ditch Interceptor Upgrade 518,200 397,400 50,082 347,318 12.6% - 347,400 - 347,400 0.0% In Process On hold per City Manager
5 WD1302 M Garrison Farm Water Storage Tank 1,828,000 4,677,000 1,943,241 2,733,759 41.5% 400,000 4,221,600 1,487,852 2,733,748 35.2% In Process Project underway, approximately 40% complete
6 WW1304 M Garrison Farm WW Improvements 1,828,000 3,687,700 2,304,313 1,383,387 62.5% - 3,149,000 1,765,597 1,383,403 56.1% In Process Project underway, approximately 70% complete
7 Totals - FY 2008 - FY 2013 $ 8,769,600 $ 12,414,300 $ 5,478,675 $ 6,935,625 44.1% $ 400,000 $ 10,191,700 $ 3,255,948 $ 6,935,752 31.9%
8
9 FY 2014
10 WW1205 Dover Brook Gardens PS Upgrade $ 52,800 $ 28,000 $ 16,043 $ 11,957 57.3% $ - $ 14,400 2,414 $ 11,986 16.8% Complete
11 WW1206 Brandywine Pump Station 402,000 375,600 181,681 193,919 48.4% - 339,100 145,206 193,894 42.8% In Process Project underway, approximately 50% complete
12 WW1207 McKee PS 55,000 154,900 147,479 7,422 95.2% - 147,200 139,755 7,446 94.9% Complete
13 WW1301 Hazlettville Rd Interceptor 20,400 5,200 5,129 71 98.6% - 1,100 1,075 25 97.7% Complete
14 WW1302 Lakeview PS 52,700 42,900 42,871 29 99.9% - 800 804 (4) 100.4% Complete
Project awarded to contractor 3/31/15, awaiting
15
WW1303 Westover PS 768,800 1,350,400 58,002 1,292,398 4.3% 718,000 1,299,600 7,254 1,292,346 0.6% In Process mobilization
16 II1402 West Dover Connector 37,800 37,800 37,800 (0) 100.0% - 2,000 2,000 - 100.0% Complete
17 II1404 Basin #5 I & I Buck Drive 342,000 378,400 90,880 287,520 24.0% - 339,200 51,729 287,471 15.3% In Process Project underway, approximately 80% complete
18 Totals - FY 2014 $ 1,731,500 $ 2,373,200 $ 579,884 $ 1,793,316 24.4% $ 718,000 $ 2,143,400 $ 350,236 $ 1,793,164 16.3%
19
20 FY 2015
21 --- Vehicles & Equipment $ 345,800 $ 345,800 $ 33,771 $ 312,029 9.8% $ 382,300 $ 345,800 $ 33,771 $ 312,029 9.8%
22 WD1500 Meter Replacement Project 19,000 19,000 - 19,000 0.0% 19,000 19,000 - 19,000 0.0% In Process
Obtaining quotes for meters and accessories
23 WD1501 Wellhead Redevelopment 80,000 80,000 6,300 73,700 7.9% 80,000 80,000 6,300 73,700 7.9% In Process
Contractor has begun, awaiting invoices
24 WQ1501 Water Quality Improvements 527,500 4,800 - 4,800 0.0% 527,500 4,800 - 4,800 0.0% In Process
Money allocated to West Dover Connector project
25 WQ1502 Misc Emerg Water Quality Repairs 75,000 75,000 60,069 14,931 80.1% - 75,000 60,069 14,931 80.1% In Process
Ongoing
Project awarded, contractor to mobilize about April
26
WQ1503 West Dover Connector Project 336,000 336,000 - 336,000 0.0% - 336,000 - 336,000 0.0% In Process 20th
27 WD1503 WTP Process Improvements 175,000 175,000 6,816 168,184 3.9% 175,000 175,000 6,816 168,184 3.9% In Process Project underway, awaiting invoices from consultant
28 WD1504 SCADA Equipment Tech Upgrade 78,000 78,000 - 78,000 0.0% 78,000 78,000 - 78,000 0.0% In Process Contract awarded, awaiting materials to be shipped
29 WD1505 Well #11 VFD Repair 6,000 6,000 5,668 332 94.5% - 6,000 5,668 332 94.5% Complete
30 WW1501 Inflow/Infiltration Removal 917,400 5,000 - 5,000 0.0% 917,400 5,000 - 5,000 0.0% In Process Money allocated to West Dover Connector project
31 WW1503 Hazzletteville Road Interceptor 755,000 201,700 - 201,700 0.0% 755,000 201,700 - 201,700 0.0% In Process Project on hold per City Manager
Project underway, awaiting material fabrication and
32
WW1504 Lakeview Dr Pump Stn Replacement 450,000 408,400 1,008 407,392 0.2% 450,000 408,400 1,008 407,392 0.2% In Process mobilization by contractor
33 WW1505 Pump Station Repairs 36,000 38,000 14,545 23,455 38.3% 36,000 38,000 14,545 23,455 38.3% Complete Project complete, awaiting invoices
Project awarded, awaiting material fabrication and
34
WW1506 Walker Rd PS Gen Replacement 58,000 58,000 - 58,000 0.0% 58,000 58,000 - 58,000 0.0% In Process mobilization by contractor
35 WW1507 Retreat Pump Station Replacement 52,000 52,000 33,593 18,407 64.6% 52,000 52,000 33,593 18,407 64.6% In Process Design 95% complete, awaiting final internal review
36 WW1508 McKee Run PS Generator Repair 14,000 25,000 23,672 1,328 94.7% - 25,000 23,672 1,328 94.7% Complete
Project awarded, contractor to mobilize about April
37
WW1509 West Dover Connector Road Utility Relo 922,000 922,000 250 921,750 0.0% - 922,000 250 921,750 0.0% In Process 20th
38 WW1510 Puncheon Run Pump Station Repair 36,000 36,000 6,972 29,028 19.4% - 36,000 6,972 29,028 19.4% Complete Awaiting final invoices
39 II1501 Misc Emergency I&I Repairs 200,000 149,400 109,299 40,101 73.2% - 149,400 109,299 40,101 73.2% In Process Ongoing
40 Totals - FY 2015 $ 5,082,700 $ 3,015,100 $ 301,961 $ 2,713,139 10.0% $ 3,530,200 $ 3,015,100 $ 301,961 $ 2,713,139 10.0%
41
42
43 Grand Totals $ 15,583,800 $ 17,802,600 $ 6,360,521 $ 11,442,079 35.7% $ 4,648,200 $ 15,350,200 $ 3,908,146 $ 11,442,054 25.5%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
SL = State Loan Project - construction phase is financed
I = Impact Fee (partially) financed project
O = Operating revenues
Page 122
City of Dover
Electric Improvement & Extension Fund - Major CIP Projects
Quarterly Report as of Mar 31, 2015
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Current Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Year Fiscal Year YTD Budget Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Balance Spent Status Comments
1 FY 2012 - FY 2013
Unit operations, balancing, and commissioning of
2 EG1212 M Unit 3 Turbine Inspection/Repair $ 1,494,000 $ 1,713,536 $ 1,561,756 $ 151,780 91.1% $ - $ 151,800 $ - $ 151,800 0.0% In Process TSI to be completed in May 2015
3 EE1308 M Horsepond Substation Upgrade 730,900 1,088,300 934,157 154,143 85.8% - 468,700 314,588 154,112 67.1% In Process Awaiting final invoices
4 EE1312 M General Scott Switchgear 1,155,000 1,155,000 30,205 1,124,795 2.6% 1,100,000 1,137,600 12,832 1,124,769 1.1% In Process
5 EE1314 Capitol Park Upgrade - 347,872 331,779 16,093 95.4% 27,500 11,356 16,144 41.3% In Process Under construction
6 Totals - FY 2012 - FY 2013 $ 3,379,900 $ 4,304,708 $ 2,857,898 $ 1,446,810 66.4% $ 1,100,000 $ 1,785,600 $ 338,775 $ 1,446,825 19.0%
7
8 FY 2014
9 --- Metering Infrastructure & Freightliner $ 392,000 $ 425,000 $ 241,828 $ 183,172 56.9% $ 33,000 $ 425,000 $ 241,828 $ 183,172 56.9% In Process
10 EE1443 GOTP Transmission Line Relocation 550,000 550,000 29,907 520,094 5.4% - 550,000 29,907 520,094 5.4% In Process
11 EG1402 M Unit 3 Cooling Tower Repairs 803,000 1,123,000 934,393 188,607 83.2% 676,000 1,091,200 902,608 188,592 82.7% Complete Final invoice to be processed
12 EG1406 McKee Run Energy Pipe Replacement 80,000 80,000 77,692 2,308 97.1% - 26,500 24,178 2,322 91.2% Complete
13 EG1407 M Metering System Upgrades 150,000 90,000 - 90,000 0.0% 125,000 90,000 - 90,000 0.0% Deferred Project on hold until FY16
14 EG1408 McKee/VanSant Safety & Compliance 185,000 86,000 59,695 26,305 69.4% - 63,100 36,770 26,330 58.3% In Process Will complete in spring
15 EG1413 McKee/VanSant Preserve Structure 42,000 42,000 - 42,000 0.0% - 42,000 - 42,000 0.0% Cancelled Project cancelled
Multi-year project. Mechanical installation in
progress. Electrical and controls modification
16 EG1416 M VanSant Capacity Increase 1,500,000 1,000,000 329,998 670,002 33.0% 750,000 901,900 231,943 669,957 25.7% In Process reviews on-going. Anticipate testing in June 2015.
17 EE1421 Richardson Circle Upgrade - 400 307 93 0.0% - 400 307 93 76.7% Complete Project complete in FY14. Final invoice rec'd FY15.
18 EE1433 Chandelle Airport URD 117,900 100,200 100,129 71 99.9% - 52,900 52,828 72 99.9% Complete
19 EE1429 Clearview Meadows 88,000 85,300 4,108 81,192 4.8% - 81,200 - 81,200 0.0% In Process
20 EE1438 Dover Downs Tower 53,800 51,600 51,508 92 99.8% - 51,600 51,508 92 99.8% Complete
21 EE1439 Family Dollar Store 9,800 7,500 7,357 143 98.1% - 7,500 7,357 143 98.1% Complete
22 EE1440 Kraft Foods 69kv Temp 10,000 10,000 5,739 4,261 57.4% - 4,300 - 4,300 0.0% Complete
23 Totals - FY 2014 $ 3,981,500 $ 3,651,000 $ 1,842,660 $ 1,808,340 50.5% $ 1,584,000 $ 3,387,600 $ 1,579,232 $ 1,808,368 46.6%
24
25 FY 2015
26 --- Vehicles & Equipment $ 53,100 $ 53,100 39,389 $ 13,711 74.2% $ 53,100 $ 53,100 $ 39,389 $ 13,711 74.2% In Process
27 EG1503 McKee Unit 3 Aux Sys Comp 160,000 89,000 84,934 4,066 95.4% 160,000 89,000 84,934 4,066 95.4% In Process
28 EG1504 McKee Unit 3 Boiler System 295,000 138,000 51,027 86,973 37.0% 295,000 138,000 51,027 86,973 37.0% In Process Will need to extend project into next FY
29 EG1505 VanSant Unit II Comp Replacement 25,000 - - - 0.0% 25,000 - - - 0.0% Cancelled
30 EG1506 McKee & VanSant Safety Improvement 52,000 52,000 30,086 21,914 57.9% 52,000 52,000 30,086 21,914 57.9% In Process
31 EG1507 McKee Run 1&2 Comp Replacement 37,000 - - - 0.0% 37,000 - - - 0.0% Cancelled Transferred budget to EG1402
32 EG1508 Plants - Preserve Structure 120,000 93,800 - 93,800 100.0% 120,000 93,800 - 93,800 0.0% Deferred Transferred portion of budget to EG1402
33 EE1500 69 kV Rebuild 75,000 75,000 1,566 73,434 2.1% 75,000 75,000 1,566 73,434 2.1%
Cancelled by state due to lack of state funding for
34 EE1505 DNREC R&R Metering 41,000 - - - 0.0% 41,000 - - - 0.0% Cancelled FY15
35 EE1506 R Lighting Proj & Rehab 50,000 50,000 - 50,000 0.0% 50,000 50,000 - 50,000 0.0%
Underground relocation to begin depending on
36 EE1509 West Dover Connector 250,000 250,000 70,678 179,322 28.3% 250,000 250,000 70,678 179,322 28.3% In Process weather
37 EE1513 M Town Point Distribution Feeders 250,000 250,000 136,635 113,365 54.7% 250,000 250,000 136,635 113,365 54.7% In Process Directional boring has begun
38 EE1514 Meadows @ Jefferson Terrace 15,400 15,400 - 15,400 0.0% 15,400 15,400 - 15,400 0.0% Waiting on developer
39 EE1515 R New Developments FY 2015 171,300 32,200 - 32,200 0.0% 171,300 32,200 - 32,200 0.0%
Contractor to install conduit to proceed, PS
40 EE1516 Chestnut Grove 299,000 299,000 118,999 180,001 39.8% 299,000 299,000 118,999 180,001 39.8% In Process completed
41 EE1520 69 kV Cable Replacement North Street 85,000 85,000 - 85,000 0.0% 85,000 85,000 - 85,000 0.0% In design
42 EE1521 College to McKee Feeders 50,000 50,000 - 50,000 0.0% 50,000 50,000 - 50,000 0.0% Cancelled PW not doing their portion for several years
43 EE1522 Garrison Oak Park 184,000 184,000 74,742 109,258 40.6% 184,000 184,000 74,742 109,258 40.6% In Process
44 EE1523 Uzin Utz 39,300 8,000 7,936 64 99.2% 39,300 8,000 7,936 64 99.2% Complete
45 EE1524 Best Buy Transformer 12,400 12,400 12,339 61 99.5% 12,400 12,339 61 99.5% Complete
46 EE1525 Leander Lakes Apt Phase 1 73,000 73,000 - 73,000 0.0% 73,000 - 73,000 0.0%
47 EE1526 Playtex Addition 200,000 200,000 8,794 191,206 4.4% 200,000 8,794 191,206 4.4% In Process NSC permits being submitted
48 EE1527 DAFB Temporary Concrete Plant 36,000 36,000 27,157 8,843 75.4% 36,000 27,157 8,843 75.4% Complete
49 EE1528 640 Beechwood Avenue 6,600 6,600 6,919 (319) 104.8% 6,600 6,919 (319) 104.8% Complete
50 EE1529 W. Denny's Bridge 5,000 5,000 4,079 921 81.6% 5,000 4,079 921 81.6%
51 EE1530 Bayhealth URD Relocation 12,600 12,600 10,144 2,456 80.5% 12,600 10,144 2,456 80.5% Complete
52 EE1531 Windstream DAFB/College Road 17,700 17,700 2,247 15,453 12.7% 17,700 2,247 15,453 12.7% In Process Fiber path from College to DAFB complete
53 EE1532 Dover Litho 1 & 2 30,500 30,500 22,580 7,920 74.0% 30,500 22,580 7,920 74.0% Complete
54 EE1533 DE State Police Generator 5,500 5,500 2,699 2,801 49.1% 5,500 2,699 2,801 49.1% Complete
55 EE1534 Hardees Rte 13 Damage 7,800 7,800 7,782 18 99.8% 7,800 7,782 18 99.8% Complete
56 EE1535 Eden Hill Lights Phase 1 17,000 17,000 17,315 (315) 101.9% 17,000 17,315 (315) 101.9% Complete
57 EE1537 Kirby and Holloway 21,900 21,900 - 21,900 0.0% 21,900 - 21,900 0.0%
58 Totals - FY 2015 $ 2,698,100 $ 2,170,500 $ 738,045 $ 1,410,555 34.0% $ 2,252,100 $ 2,170,500 $ 738,045 $ 1,432,455 34.0%
59
60 Grand Totals $ 10,059,500 $ 10,126,208 $ 5,438,603 $ 4,665,705 53.7% $ 4,936,100 $ 7,343,700 $ 2,656,053 $ 4,687,647 36.2%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years. B = Bonded Project
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year. S = State fully or partially reimbursed project
Page 123
City of Dover
2015/16 STAFF APPOINTMENTS - COUNCIL
A. City Assessor.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cheryl A. Bundek
B. Building Inspector.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ann Marie Townshend
C. City Clerk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Traci A. McDowell
D. Assistant City Clerk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Denise L. Devine
E. Controller/Treasurer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Donna S. Mitchell
F. Assistant Controller/Treasurer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Lori Peddicord
G. Assistant Treasurers. . . . . . . . . . . . . . . . . . . . . . . Denise L. Devine and Traci A. McDowell
H. Fire Marshal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Timothy P. Mullaney, Jr.
I. City Planner.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ann Marie Townshend
J. City Solicitor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Nicholas H. Rodriguez
K. Deputy City Solicitor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . William W. Pepper, Sr.
S:\ANNUAL MEETINGS\2015 Meeting\Annual Meeting Appointments-Staff.wpd
Prepared by: City Clerk's Office/tm
Page 124
City of Dover
MAYOR’S COMMITTEE APPOINTMENTS - 2015/16
1. COMPENSATION COMMISSION - To consider compensation for the Mayor, City Council, and paid
members of City Committees and Commissions. The compensation commission shall consist of five (5)
members, one (1) member appointed by the mayor, one (1) member appointed by the council president, and
three (3) members appointed by city council during the annual meeting. Members shall be city residents who
are registered to vote in city elections. Members shall serve two (2) year terms and cannot be reappointed
within the next two (2) years. The controller/treasurer and human resources director shall serve as ex-officio,
nonvoting members.
Mayor Christiansen requests that this appointment be deferred
2. DOVER FOURTH OF JULY CELEBRATION COMMITTEE - Operates independently in terms of
raising and expending funds for the City of Dover 4th of July Celebration. Consists of not less than five
(5) members and not more than nine (9) members who shall be appointed annually upon the recommendation
of the Mayor and approval of City Council. The membership shall include the Mayor of Dover (Ex-Officio)
as Chairman of the Board. Other officers shall include a President/Vice Chairman, Vice President, Secretary,
and Treasurer.
A. Greg Patterson, President/Vice Chairman
B. Robin R. Christiansen, Chairman (ex-officio)
C. Brad Holden, Vice-President
D. Donna Mitchell, Treasurer/Secretary (Staff Liaison)
E. Ann Marie Townshend (Staff Liaison)
F. Susan Betts
G. Sarah Zimmerman
H. Andrea Maucher
I. Karen Nickerson
3. DOVER PUBLIC LIBRARY ADVISORY COMMISSION - To assist the City in the administration
and supervision of its public library facility; consider major policies proposed by staff and provide
Council with advice on such policies prior to implementation, all grant requests, long range planning,
etc. One (1) member of Council shall be appointed during the Annual Meeting to serve as a liaison member.
A. Scott W. Cole (Council Liaison Member)
Page 125
MAYORAL APPOINTMENTS - 2015/2016 COMMITTEES PAGE 2
4. DOWNTOWN DOVER PARTNERSHIP BOARD OF DIRECTORS - To promote the public welfare
of the residents of the City of Dover by promoting and furthering the development of the economic,
cultural, and historic resources in the downtown area, and to improve the opportunities for job
creation, broaden the tax base through the development of the commercial and residential potential of
the Central Dover area, and to maintain and restore the historic architectural and community qualities
of the downtown area consistent with the goals of the National Main Street Program.
Consists of twenty-one (21) directors appointed from two (2) categories: governmental agency appointees and
appointees from the private sector.
Governmental agency appointees: Five (5) individuals, either elected or appointed from within the
government of the City of Dover including the City Manager, the City Planner, and three (3) members of City
Council (these individuals shall be nominated by the Mayor and confirmed by City Council and will serve on
the Board at the pleasure of the Mayor and Council); and five (5) representatives from State government,
including one (1) appointed by the Mayor and confirmed by City Council; two (2) appointed by the Governor
(one (1) from the Office of Economic Development, and one (1) from the Office of the Secretary of State);
the elected State Senator from the 17th Senatorial District; and the elected Representative from the 31st
Representative District.
Private sector appointees: Individuals in the second category will be nominated by the Mayor and confirmed
by City Council and shall consist of eleven (11) representatives from the private sector with strong ties and
commitment to revitalization of the downtown Dover area who should not now hold full-time elected or
appointed public office. Members in this category must include a resident of the downtown Dover area or
an adjoining neighborhood, a downtown cultural arts representative, a downtown business owner, a downtown
retailer, a real estate professional whose practice includes the downtown Dover area, a financial services
professional whose practice includes the downtown Dover area, the chief executive officer of Bayhealth or
his/her designee, the president of Wesley College or his/her designee, and three (3) undesignated
representatives. At least five (5) of these individuals must also either own a commercial property within the
Business Improvement District or be designees of such owners.
City of Dover Government (5) - Appointed by the Mayor and Confirmed by Council
A. David L. Anderson - Council Representative
B. William F. Hare - Dover City Council Representative
C. James E. Hosfelt, Jr. - Council Representative
D. Scott D. Koenig - City of Dover Representative
E. Ann Marie Townshend - City of Dover Representative
State Government (5)
Mayor Christiansen requests that this appointment be deferred
Page 126
MAYORAL APPOINTMENTS - 2015/2016 COMMITTEES PAGE 3
4. DOWNTOWN DOVER PARTNERSHIP BOARD OF DIRECTORS (Continued)
Private Sector (11) - Appointed by the Mayor and Confirmed by Council
A. John Tinsley - Commercial Property Owner
B. Cindy Small - Downtown Cultural Arts Representative
C. Gregory V. Moore, President - Downtown Business Owner/Commercial Property Owner Designee
D. Mayor Robin R. Christiansen (Ex-Officio Member)
5. ELECTION BOARD - To assist Mayor and Council in matters relating to voter registration and
municipal elections. Consists of five (5) members, with staggered three (3) year terms, to be appointed by
the Mayor and confirmed by Council during the Annual Meeting. One (1) member appointed from each of
the four (4) council districts and one (1) appointed at-large. Each member must be a citizen of U.S., a
registered voter of the City, and have resided in the City for one (1) year prior to the appointment. The Mayor
and members of Council, their parents, spouse, or children, shall not be eligible for appointment to the
election board.
A. Anita L. McDowell Boyer - First District
B. Cherrita L. Matthews - Second District
6. PROPERTY MAINTENANCE CODE BOARD OF APPEALS - To review appeals of the building
inspectors’ decisions with regards to property maintenance issues, including vacant buildings. Consists
of three (3) members, one (1) being a resident generally selected as a representative of homeowners, one (1)
representative of the local real estate industry association, and one (1) member shall be the City Manager.
A. Charles Martin (Representative of Local Real Estate)
B. Mayor Christiansen requests that this appointment be deferred
7. SILVER LAKE COMMISSION - To consider matters related to Silver Lake and the St. Jones River
Watershed, including the Fork, Mudstone, Penrose, and Cahoon Branches, and Puncheon Run; open
spaces and park lands; and water activities, to include swimming, boating, skiing, and fishing. Consists
of seven (7) members to be appointed by the Mayor and confirmed by Council at the Annual Meeting.
A. James Burcham
B. Zachary Carter
C. Ann Marie Townshend
D. David L. Edgell
E. Dean Holden
F. Tricia Arndt
G. Lyle Allen Jones
S:\ANNUAL MEETINGS\2015 Meeting\Annual Meeting Appointments-Mayor.wpd Prepared by: City Clerk's Office/tm
Rev. 04/29/15
Page 127
City of Dover, Delaware
FY 2015 -2019 Five Year Consolidated Plan
Prepared by:
The City of Dover Planning & Community
Development Office
May 11, 2015
Page 128
Table of Contents
Executive Summary Page
ES-05 Executive Summary 1
The Process
PR-05 Lead & Responsible Agencies 4
PR-15 Citizen Participation 8
Needs Assessment
NA-05 Overview 10
NA-10 Housing Needs Assessment 11
NA-15 Disproportionately Greater Need: Housing Problems 18
NA-20 Disproportionately Greater Need: Severe Housing Problems 21
NA-25 Disproportionately Greater Need: Housing Cost Burden 24
NA-30 Disproportionately Greater Need: Discussion 25
NA-35 Public Housing 26
NA-40 Homeless Needs Assessment 30
NA-45 Non-Homeless Special Needs Assessment 33
NA-50 Non-Housing Community Development Needs 34
Market Analysis
MA-05 Overview 36
MA-10 Number of Housing Units 37
MA-15 Housing Market Analysis: Cost of Housing 39
MA-20 Housing Market Analysis: Condition of Housing 41
MA-25 Public and Assisted Housing 43
MA-30 Homeless Facilities and Services 45
MA-35 Special Needs Facilities and Services 48
MA-45 Non-Housing Community Development Assets 52
MA-50 Needs and Market Analysis Discussion 57
Strategic Plan
SP-05 Overview 60
SP-10 Geographic Priorities 62
SP-25 Priority Needs 63
SP-30 Influence of Market Conditions 65
SP-35 Anticipated Resources 66
Page 129
SP-40 Institutional Delivery Structure 68
SP-45 Goals Summary 71
SP-50 Public Housing Accessibility and Involvement 73
SP-55 Barriers to affordable housing 74
SP-60 Homeless Strategy 75
SP-65 Lead based paint Hazards 77
SP-70 Anti-Poverty Strategy 78
SP-80 Monitoring 81
Annual Action Plan
AP-15 Expected Resources 82
AP-20 Annual Goals and Objectives 85
AP-35 Projects 87
AP-38 Project Summary 88
AP-50 Geographical Distribution 92
AP-55 Affordable Housing 93
AP-60 Public Housing 95
AP-60 Homeless and Other Special Needs 96
AP-75 Barriers to affordable housing 98
AP-85 Other Actions 99
AP-85 Other Actions 102
Attachments
Council Resolution
Application for Federal Assistance SF-424
Public Hearing and Online Survey Comments
Downtown Development District Boundary Map
Consolidated Plan Target Area Map
Certifications
Page 130
Executive Summary
ES-05 Executive Summary - 24 CFR 91.200(c), 91.220(b)
1. Introduction
Dover, the Capital of Delaware, is centrally located in the state and is part of the Mid-Atlantic
region. The City is located approximately 90 miles from both Philadelphia and Washington,
D.C. Dover’s population ranks second only to Wilmington, Delaware. Delaware and the Eastern
Shore counties of Maryland and Virginia comprise the Delmarva Peninsula. Dover is also the
largest city in land area on the peninsula with a total land area of over 23 square miles.
The Consolidated Plan (2015-2019) is a five year plan mandated by the United States
Department of Housing and Urban Development (HUD). This plan identifies the specific needs
concerning affordable housing, homeownership, housing rehabilitation, homelessness and
community development needs such as public service needs. The strategic plan element of this
plan specifies the goals identified in the preparation of this plan and includes the four goals that
the Consolidated Plan revolves around. These goals in order of priority are:
1. Provide aid to special needs persons.
2. Preserve the existing housing stock.
3. Encourage owner occupied housing in low to moderate income areas.
4. Provide safe and livable neighborhoods.
The Action Plan component of the Plan specifies how the projects will further these goals for
fiscal year 2015.
2. Summary of the objectives and outcomes identified in the Plan Needs Assessment
Overview
The Consolidated Plan requires the City to access its housing and homeless needs, needs
assessment and housing market analysis. These needs will be discussed further in the
Consolidated Plan. The following summary will identify the objectives and outcomes of these
needs utilizing CDBG funds.
3. Evaluation of past performance
Consolidated Plan DOVER 1
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 131
The City elected to implement multi-year grants for the 2010-2014 Consolidated Plan within the
third year of the plan based on community development needs that were identified in the
planning process of the Consolidated Plan. These needs included homeownership assistance,
assisting the homeless, homeowner rehabilitation, public facility improvements and general
public service needs. These needs have been consistent in the City of Dover since the City
became an entitlement in 1995.
Within the last three years, emergency home repairs were completed on 50 owner
occupied homes, 15 housing units were rehabilitated, and 21 low to moderate income persons
received homeownership assistance to purchase affordable housing in the City.
The City continues to meet the timeliness standard for expenditures of funds in a timely
manner and continues to obligate over the 70% requirement of CDBG funds on activities that
benefit low to moderate persons.
4. Summary of citizen participation process and consultation process
A minimum of two public hearings are required. Adequate notice is given through
advertisement in the City’s local newspaper and the City’s website, with copies of the notices
sent to such service agencies and public housing administration offices who serve and advocate
for the low and very low income persons and disability communities to encourage citizens
participation input by the citizens and their advocates to meet the needs of citizens and
particularly those who are beneficiaries of the programs covered in the Consolidated Plan. The
draft plan will be available for review for 30 days. The draft plan was made available for review
on April 1, 2015. The public hearing to comment on the draft Consolidated Plan was held on
April 21, 2015.
The City will consider any comments or views of citizens or units of local government received
in writing, or orally at public hearings, meetings, etc., in preparing the City’s final Consolidated
Plan and Annual Action Plan. A fifteen-day period will be set aside for comments. A summary
of these comments and responses shall be attached to the final Consolidated Plan amendment
of the plan or Performance Report.
5. Summary of public comments
No written comments were received during the 30-day public review period for the
Consolidated Plan and the 2015 Action Plan.
6. Summary of comments or views not accepted and the reasons for not accepting them
There were no comments that required a formal response.
Consolidated Plan DOVER 2
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 132
7. Summary
Delaware State Housing Authority initiated statewide citizen participation and stakeholder
outreach participation that included all of the HUD CDBG entitlement communities in
Delaware. The outreach included public hearings, stakeholder interviews and a web-based
community needs survey. The web based survey was available for six weeks and heavily
publicized on flyers and distributed throughout the state. On November 12, 2014, the City of
Dover conducted its first public hearing to determine the community development needs in the
City of Dover. Attached are the results of the survey and comments from the public hearing.
The priority needs for the City of Dover include initiatives to assist the homeless and
rehabilitation activities involving rental housing units.
Consolidated Plan DOVER 3
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 133
The Process
PR-05 Lead & Responsible Agencies 24 CFR 91.200(b)
1. Describe agency/entity responsible for preparing the Consolidated Plan and those
responsible for administration of each grant program and funding source
The following are the agencies/entities responsible for preparing the Consolidated Plan and
those responsible for administration of each grant program and funding source.
Agency Role Name Department/Agency
CDBG Administrator DOVER Planning/ City of Dover
Table 1 – Responsible Agencies
Narrative
The Community Development Office is a part of the Department of Planning and Community
Development in the Public Services Department. The Community Development Office has one
full time employee, a Planner, who administers the CDBG Grant and is the Fair Housing
Coordinator. Clerical, planning and inspection assistance is provided by the Planning and
Inspections Department. The Building Inspections Office also provides housing and life safety
inspections throughout the City including property maintenance. The Dover Housing Authority
provides responsibility for the public housing needs within the City and is a separate entity from
the City. The Delaware State Housing Authority who operates both Section 8 vouchers and
public housing units also caters to the housing needs of low-moderate income families.
Consolidated Plan Public Contact Information
City of Dover Department of Planning & Community Development
15 Loockerman Plaza, Dover, DE 19901
Phone (302) 736-7196 Fax: (302) 736-4217
Website: www.cityofdover.com
Tracey Harvey, Planner
Email: tharvey@dover.de.us
Consolidated Plan DOVER 4
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 134
Consultation - 91.100, 91.200(b), 91.215(l)
1. Introduction
Provide a concise summary of the jurisdiction’s activities to enhance coordination between
public and assisted housing providers and private and governmental health, mental health
and service agencies (91.215(I)).
Development of the Consolidated Plan has involved several months of effort and coordination
by gathering members of the community, state and local housing authorities and various state
and county agencies within the State of Delaware to consult on topics regarding homelessness,
persons with disabilities, elderly, persons with HIV/AIDS, services for children and housing
needs. The following is a list of agencies that the City of Dover consulted with in preparing the
Consolidated Plan:
Homeless Planning Council
Delaware State Housing Authority
Dover Housing Authority
Milford Housing Development Corporation
Central Delaware Habitat for Humanity
City of Dover Economic Development Office
City of Dover Department of Public Works
City of Dover City Manager’s Office
State of Delaware Department of Health and Social Services
State of Delaware Division of Family Services
Describe coordination with the Continuum of Care and efforts to address the needs of
homeless persons (particularly chronically homeless individuals and families, families with
children, veterans, and unaccompanied youth) and persons at risk of homelessness
The Homeless Planning Council is the coordinator of the Continuum of Care (CoC) for the State
of Delaware. City planning staff is a designated member of the Delaware Interagency Council of
Homelessness and will continue to support the need of ending chronic homelessness by
actively collaborating with housing providers that service the homeless and those that are at
risk of homelessness.
Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in
determining how to allocate ESG funds, develop performance standards and evaluate
outcomes, and develop funding, policies and procedures for the administration of HMIS
Not applicable, the City of Dover does not receive ESG funds.
Consolidated Plan DOVER 5
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 135
2. Describe Agencies, groups, organizations and others who participated in the process and
describe the jurisdictions consultations with housing, social service agencies and other
entities
The citizen participation process for the 2015-2019 Consolidated Plan began in the fall of 2014
which was initiated with a collaborative effort with Delaware State Housing Authority (DSHA),
New Castle County and the City of Wilmington conducting a series of state-wide public hearings
to determine the needs in each jurisdiction. An online statewide Community Development
needs survey was developed by DSHA and available for all the jurisdictions to seek additional
needs and priorities from citizens in their communities.
During the City’s first public hearing, staff from Central Delaware Habitat for Humanity and
Milford Housing Development Corporation provided their input regarding community
development needs in Dover.
Consolidated Plan DOVER 6
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 137
PR-15 Citizen Participation
1. Summary of citizen participation process/Efforts made to broaden citizen participation
Summarize citizen participation process and how it impacted goal-setting
The City of Dover’s Consolidated Plan Citizen Participation Plan (CPP) has been prepared by the City of Dover in accordance with the
requirements contained in Part 9115 of Title 24 of the Code of Federal Regulations. The CPP outlines the various methods the City
will use to inform its citizens of, and actively involve them in developing the Consolidated Plan.
The Consolidated Plan serves as the housing and community development planning document of the City and its application for
funding under the current Community Planning and Development (CDP) formula program CDBG.
A minimum of two public hearings are required to allow the public an opportunity to comment on the Consolidated Plan, Annual
Action Plan and the Consolidated Annual Performance Evaluation Report (CAPER). Adequate notice is given through advertisement
in the City’s local newspaper, and copies of the notices are sent to such service agencies and public housing administrative offices
who serve and advocate for the low and very low income persons and disability communities to encourage citizens participation
input and meet the needs of the citizens who are beneficiaries of the program covered in the Consolidated Plan.
The Draft Plans are made available for review and comments for 30 days at City offices and on the City’s website. The City will
consider any comments or views received in writing or orally and a summary of any views or comments not accepted and the reason
therefore shall be attached to all final reports.
Consolidated Plan DOVER 8
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 138
Citizen Participation Outreach
Sort Order Mode of Outreach Target of Outreach Summary of Summary of Summary of comments URL (If applicable)
response/attendance comments received not accepted
and reasons
1 Public Hearing Non- 2nd public hearing
targeted/broad was held on the Draft
community Consolidated Plan
and Annual Action
Plan
2 News Paper Ad Non- Notice of Availability
targeted/broad of Draft Consolidated
community Plan and Annual
Action Plan
3 Internet Outreach Non-targeted/ Notice of Availability www.cityofdover.com
broad community of Draft Consolidated community
Plan and Action Plan development
4 Public Hearing Non- City of Dover 1st Summary of
targeted/broad Public Hearing on comments attached
community housing and
community
development needs
5 Internet Outreach Non- Online Survey for Summary of www.cityofdover.com
targeted/broad housing and comments attached community
community community development
development needs
for Dover
Table 4 – Citizen Participation Outreach
Consolidated Plan DOVER 9
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 139
Needs Assessment
NA-05 Overview
Needs Assessment Overview
The Delaware State Housing Authority completed the 2015-2020 Needs Assessment for the
State of Delaware in the summer of 2014. The Needs Assessment addresses the most pressing
housing issues and provides an estimate for future demand between 2015 and 2020. Because
Delaware has a variety of housing markets, the study identifies housing needs within
neighborhoods and market areas throughout the State, County and major cities within
Delaware including Dover.
Consolidated Plan DOVER 10
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 140
NA-10 Housing Needs Assessment - 24 CFR 91.205 (a,b,c)
Summary of Housing Needs
A total of 39.4% of all households in the City of Dover are 80% and below the HUD Area Median
Family Income (HAMFI): 13.7% of households have incomes between 0% and 30% of the
HAMFI; 12.5% of households have incomes between 30% and 50% HAMFI, and 13.1% of
households have incomes between 50% and 80% HAMFI. Over 42% of households in the City
spend more than 30% of their income on rent/mortgage and utilities that are suffering a cost
burden. The housing cost burden is extremely difficult for very low income households that are
between 0% and 30% HAMFI because over 60% of this population spends more than 50% of
their income on housing.
Demographics Base Year: 2000 Most Recent Year: 2011 % Change
Population 32,135 35,849 12%
Households 12,460 12,603 1%
Median Income $38,669.00 $47,754.00 23%
Table 5 - Housing Needs Assessment Demographics
Data Source: 2000 Census (Base Year), 2007-2011 ACS (Most Recent Year)
Number of Households Table
0-30% >30-50% >50-80% >80-100% >100%
HAMFI HAMFI HAMFI HAMFI HAMFI
Total Households * 1,730 1,575 1,650 1,700 5,945
Small Family Households * 560 320 855 630 3,030
Large Family Households * 245 110 110 165 430
Household contains at least one
person 62-74 years of age 365 335 260 195 1,220
Household contains at least one
person age 75 or older 235 390 280 195 500
Households with one or more
children 6 years old or younger * 625 275 290 329 530
* the highest income category for these family types is >80% HAMFI
Table 6 - Total Households Table
Data Source: 2007-2011 CHAS
Consolidated Plan DOVER 11
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 141
Housing Needs Summary Tables
1. Housing Problems (Households with one of the listed needs)
Renter Owner
0-30% >30- >50- >80- Total 0-30% >30- >50- >80- Total
AMI 50% 80% 100% AMI 50% 80% 100%
AMI AMI AMI AMI AMI AMI
NUMBER OF HOUSEHOLDS
Substandard
Housing -
Lacking
complete
plumbing or
kitchen facilities 10 0 10 0 20 15 0 0 15 30
Severely
Overcrowded -
With >1.51
people per
room (and
complete
kitchen and
plumbing) 0 10 0 0 10 0 0 0 0 0
Overcrowded -
With 1.01-1.5
people per
room (and none
of the above
problems) 0 0 4 0 4 70 0 10 40 120
Housing cost
burden greater
than 50% of
income (and
none of the
above
problems) 895 480 145 0 1,520 105 320 85 60 570
Housing cost
burden greater
than 30% of
income (and
none of the
above
problems) 125 210 315 330 980 30 115 310 245 700
Consolidated Plan DOVER 12
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 142
Renter Owner
0-30% >30- >50- >80- Total 0-30% >30- >50- >80- Total
AMI 50% 80% 100% AMI 50% 80% 100%
AMI AMI AMI AMI AMI AMI
Zero/negative
Income (and
none of the
above
problems) 80 0 0 0 80 35 0 0 0 35
Table 7 – Housing Problems Table
Data 2007-2011 CHAS
Source:
2. Housing Problems 2 (Households with one or more Severe Housing Problems: Lacks kitchen
or complete plumbing, severe overcrowding, severe cost burden)
Renter Owner
0- >30- >50- >80- Total 0- >30- >50- >80- Total
30% 50% 80% 100% 30% 50% 80% 100%
AMI AMI AMI AMI AMI AMI AMI AMI
NUMBER OF HOUSEHOLDS
Having 1 or more of
four housing problems 905 490 160 0 1,555 190 320 95 115 720
Having none of four
housing problems 480 425 600 945 2,450 35 340 795 640 1,810
Household has negative
income, but none of the
other housing problems 80 0 0 0 80 35 0 0 0 35
Table 8 – Housing Problems 2
Data 2007-2011 CHAS
Source:
3. Cost Burden > 30%
Renter Owner
0-30% >30- >50- Total 0-30% >30- >50- Total
AMI 50% 80% AMI 50% 80%
AMI AMI AMI AMI
NUMBER OF HOUSEHOLDS
Small Related 410 210 360 980 30 75 250 355
Large Related 125 35 10 170 95 4 20 119
Elderly 215 170 19 404 64 200 60 324
Other 285 280 80 645 30 150 65 245
Total need by 1,035 695 469 2,199 219 429 395 1,043
income
Consolidated Plan DOVER 13
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 143
Table 9 – Cost Burden > 30%
Data 2007-2011 CHAS
Source:
4. Cost Burden > 50%
Renter Owner
0-30% >30-50% >50-80% Total 0-30% >30-50% >50-80% Total
AMI AMI AMI AMI AMI AMI
NUMBER OF HOUSEHOLDS
Small Related 370 125 120 615 20 75 40 135
Large Related 100 35 0 135 35 0 0 35
Elderly 150 120 4 274 29 105 15 149
Other 285 210 20 515 30 135 30 195
Total need by 905 490 144 1,539 114 315 85 514
income
Table 10 – Cost Burden > 50%
Data 2007-2011 CHAS
Source:
5. Crowding (More than one person per room)
Renter Owner
0-30% >30- >50- >80- Total 0-30% >30- >50- >80- Total
AMI 50% 80% 100% AMI 50% 80% 100%
AMI AMI AMI AMI AMI AMI
NUMBER OF HOUSEHOLDS
Single family
households 0 10 4 0 14 70 0 10 25 105
Multiple, unrelated
family households 0 0 0 0 0 0 0 0 15 15
Other, non-family
households 0 0 0 0 0 0 0 0 0 0
Total need by 0 10 4 0 14 70 0 10 40 120
income
Table 11 – Crowding Information – 1/2
Data 2007-2011 CHAS
Source:
Renter Owner
0-30% >30- >50- Total 0-30% >30- >50- Total
AMI 50% 80% AMI 50% 80%
AMI AMI AMI AMI
Households with
Children Present 0 0 0 0 0 0 0 0
Consolidated Plan DOVER 14
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 144
Table 12 – Crowding Information – 2/2
Data Source
Comments:
Describe the number and type of single person households in need of housing assistance.
The 2014 Point in Time Study conducted by the Homeless Planning Council indicates there were
26 individuals who were in Transitional Housing, 119 individuals in Emergency Shelters, and 10
individuals in Permanent Supportive Housing. As of April 2014, Housing needs for single person
households on the Dover Housing Authority Public Housing waiting list indicates 101 individuals
were in need of 0 Bedroom which is efficiency, and 74 individuals were in need of a 1 bedroom.
Estimate the number and type of families in need of housing assistance who are disabled or
victims of domestic violence, dating violence, sexual assault and stalking.
Based on 2014 data from Dover Housing Authority, there were 21 families with disabilities on
the Section 8 waiting list, and 39 families with disabilities on the Public Housing waiting list.
There was no data available for victims of domestic violence, dating violence and sexual assault
and stalking.
What are the most common housing problems?
The most common housing problem in Dover is the cost burden where 57% households that are
0-30% of the Area Median Income (AMI) are paying greater than 50% of their income on
housing; and over 42% of all households in the city spend more than 30% of their income on
housing and utilities and suffering a cost burden. This population is at risk of becoming
homeless with very little left to purchase food and clothing. Delaware is the 10 th highest in the
country with the highest two-bedroom housing wage in Kent County at $19.04 based on data
from the National Low Income Housing Coalition. A two-bedroom fair market rent in Kent
County is $990.00 which makes it impossible for individuals earning less than $19.04 an hour to
afford a modest two bedroom apartment in Kent County. Secondly, the data reported an
estimated 61% of Delaware renters cannot afford a two-bedroom apartment in the county they
live in.
Are any populations/household types more affected than others by these problems?
Households that are elderly, persons with disabilities and low income veterans carry the highest
burden with very few affordable housing units available. This population is on a fixed income
and is suffering from a severe housing cost burden. A disabled person dependent on SSI cannot
afford an efficiency apartment in the State of Delaware.
Describe the characteristics and needs of Low-income individuals and families with children
(especially extremely low-income) who are currently housed but are at imminent risk of
either residing in shelters or becoming unsheltered 91.205(c)/91.305(c)). Also discuss the
Consolidated Plan DOVER 15
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 145
needs of formerly homeless families and individuals who are receiving rapid re-housing
assistance and are nearing the termination of that assistance
Households that are at 30% and below the area median income are at imminent risk of
becoming homeless. These populations, particularly single parent households with children
have a greater need for affordable housing and additional supportive services. Due to the
average Fair Market Rent of $990.00 in Kent County for a two bedroom apartment, affordable
housing is impossible for this population unless they have a Housing Choice Voucher or reside
in Public Housing.
It will be especially difficult for families receiving rapid re-housing and that were formerly
homeless to maintain affordable housing if they are not gainfully employed. Often the
homeless population suffers from substance abuse, mental illness and incarceration. It is
important for this population to receive case management and assistance from social service
agencies to prevent recidivism and relapses from substance abuse.
If a jurisdiction provides estimates of the at-risk population(s), it should also include a
description of the operational definition of the at-risk group and the methodology used to
generate the estimates:
The criteria for defining “at-risk of homelessness” per HUD guidelines is an individual or family
who: (1) has an annual income below 30% of the median family income for the area; and (2)
does not have sufficient resources or support networks immediately available to prevent them
from moving to an emergency shelter or another place defined in Category 1 of the “homeless”
definition: and (3) meets one of the following conditions: (a) Has moved because of economic
reasons 2 or more times during the 60 days immediately preceding the application for
assistance; or (b) is living in the home of another because of economic hardship; or (c) has been
notified that their right to occupy their current housing or living situation will be terminated
within 21 days after the date of application for assistance; or (d) lives in a hotel or motel and
the cost is not paid for by charitable organizations or by Federal, State, or local government
programs for low-income individuals: or (e) lives in severely overcrowded housing: or (f) is
exiting a publicly funded institution or system of care; or (g) otherwise lives in housing that has
characteristics associated with instability and an increased risk of homelessness.
For households and individuals that are 30% and below the area median income and pay more
than 50% their income for housing will put them “at risk for homelessness” if they don’t have a
subsidy to supplement their income or any additional resources.
Specify particular housing characteristics that have been linked with instability and an
increased risk of homelessness
Instability and increased risk of homelessness are linked together by mental illness and drug
abuse; living in temporary housing such as a motel or hotel; lack of maintaining stable
employment and individuals that were recently incarcerated or released from a mental health
Consolidated Plan DOVER 16
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 146
facility. Other areas that could impact instability include lack of available resources such as the
availability of affordable housing such as public housing or Section 8; domestic abuse, high
medical expenses, or housing that has been condemned due to unsafe and inhabitable living
conditions as well as being evicted.
Discussion
The city is working on several initiatives in conjunction with other agencies that will assist in
providing affordable housing and reducing the risk of homelessness for low income persons.
The city is one of the stakeholders in the Restoring Central Dover Initiative which goal is to
revitalize central Dover. Part of the initiative includes expanding the housing repair program to
provide additional resources in the target area for home repairs and to boost homeownership
opportunities in this area by providing down payment assistance and funding for renovations to
families who purchase properties in the designated area. Habitat for Humanity is the lead
agency for the Strong Neighborhood Housing Fund which will acquire vacant or foreclosed
properties in the target area and use CDBG funding to renovate the property to sell to a family
who is 60% and below the area median income in Dover. There are also several incentives
available through the Downtown Dover Development District designation. If a property is
purchased within the Downtown Redevelopment Target Area, the transfer tax will be waived
for owner occupied first time homebuyers and property taxes will be abated for owner
occupied homes. Eligible persons shall also be given relief from payment of real estate taxes
for the first four years owning their homes with prorated payments for each of the four years
the home owner is occupying the property.
Consolidated Plan DOVER 17
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 147
NA-15 Disproportionately Greater Need: Housing Problems – 91.205 (b)(2)
Assess the need of any racial or ethnic group that has disproportionately greater need in comparison to
the needs of that category of need as a whole.
Introduction
In each income category, African American families have the overall highest percentage of
housing problems than any other race with an average of 43%, while white families have an
overall average of 38% and Hispanics with 8%.
Housing problems exists when there is at least one of the following problems: lacks complete
kitchen facilities, lacks complete plumbing facilities, more than one person per room, and a cost
burden greater than 30% as defined by HUD.
HUD’s definition of “Disproportionately greater need “exists when the percentage of persons in
a category of need who are members of a particular racial or ethnic group is at least 10
percentage points higher than the percentage of persons in the category as a whole.
0%-30% of Area Median Income
Housing Problems Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 1,220 225 95
White 445 55 75
Black / African American 575 115 0
Asian 0 0 0
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 140 25 0
Table 13 - Disproportionally Greater Need 0 - 30% AMI
Data Source: 2007-2011 CHAS
*The four housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than one person per
room, 4.Cost Burden greater than 30%
Consolidated Plan DOVER 18
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 148
30%-50% of Area Median Income
Housing Problems Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 1,070 590 0
White 440 300 0
Black / African American 600 210 0
Asian 0 0 0
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 30 65 0
Table 14 - Disproportionally Greater Need 30 - 50% AMI
Data Source: 2007-2011 CHAS
*The four housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than one person per
room, 4.Cost Burden greater than 30%
50%-80% of Area Median Income
Housing Problems Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 1,165 905 0
White 485 665 0
Black / African American 490 205 0
Asian 80 0 0
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 95 25 0
Table 15 - Disproportionally Greater Need 50 - 80% AMI
Data Source: 2007-2011 CHAS
*The four housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than one person per
room, 4.Cost Burden greater than 30%
Consolidated Plan DOVER 19
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 149
80%-100% of Area Median Income
Housing Problems Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 375 1,260 0
White 125 710 0
Black / African American 135 440 0
Asian 25 10 0
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 40 64 0
Table 16 - Disproportionally Greater Need 80 - 100% AMI
Data Source: 2007-2011 CHAS
*The four housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than one person per
room, 4.Cost Burden greater than 30%
Discussion
There are 10,625 households in the City of Dover with one or more of the four housing
problems. Of that total, 1,220 are extremely low income (0%-30%HAMFI); 1,070 are low income
households between (30%-50% HAMFI), and 1,165 are moderate income households at (50%-
80% HAMFI). Only 375 households have housing problems that are at 80% and above the
HAMFI. African Americans have the highest number of housing problems followed by Whites
and Hispanics.
Consolidated Plan DOVER 20
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 150
NA-20 Disproportionately Greater Need: Severe Housing Problems – 91.205
(b)(2)
Assess the need of any racial or ethnic group that has disproportionately greater need in comparison to
the needs of that category of need as a whole.
Introduction
Severe housing problems occur when the following problems exist within a household: lack of
complete kitchen facilities, lack of complete plumbing facilities, more than 1.5 persons per
room, and a cost burden over 50% of household income. Severe housing problems are most
prevalent for households whose income is 0%-30% of the Area Median Income.
0%-30% of Area Median Income
Severe Housing Problems* Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 1,130 315 95
White 405 95 75
Black / African American 525 165 0
Asian 0 0 0
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 140 25 0
Table 17 – Severe Housing Problems 0 - 30% AMI
Data Source: 2007-2011 CHAS
*The four severe housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than 1.5 persons per
room, 4.Cost Burden over 50%
30%-50% of Area Median Income
Severe Housing Problems* Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 720 935 0
White 320 420 0
Black / African American 370 440 0
Asian 0 0 0
Consolidated Plan DOVER 21
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 151
Severe Housing Problems* Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 30 65 0
Table 18 – Severe Housing Problems 30 - 50% AMI
Data Source: 2007-2011 CHAS
*The four severe housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than 1.5 persons per
room, 4.Cost Burden over 50%
50%-80% of Area Median Income
Severe Housing Problems* Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 295 1,765 0
White 150 1,000 0
Black / African American 115 585 0
Asian 10 70 0
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 25 95 0
Table 19 – Severe Housing Problems 50 - 80% AMI
Data Source: 2007-2011 CHAS
*The four severe housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than 1.5 persons per
room, 4.Cost Burden over 50%
80%-100% of Area Median Income
Severe Housing Problems* Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
Jurisdiction as a whole 85 1,555 0
Consolidated Plan DOVER 22
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 152
Severe Housing Problems* Has one or more of Has none of the Household has
four housing four housing no/negative
problems problems income, but none
of the other
housing problems
White 10 830 0
Black / African American 60 520 0
Asian 0 35 0
American Indian, Alaska Native 0 0 0
Pacific Islander 0 0 0
Hispanic 0 104 0
Table 20 – Severe Housing Problems 80 - 100% AMI
Data Source: 2007-2011 CHAS
*The four severe housing problems are:
1. Lacks complete kitchen facilities, 2. Lacks complete plumbing facilities, 3. More than 1.5 persons per
room, 4.Cost Burden over 50%
Discussion
There are 2,230 households in the City of Dover that are experiencing severe housing problems.
Of that total, 1,130 are between 0%-30% of the HAMFI, 720 are between 30%-50% of the
HAMFI, 290 are between 50%-80% of the HAMFI and 85 are between 80%-100% of the HAMFI.
African Americans households that are very low income have the highest rate of severe housing
problems in the City of Dover, followed by whites and a total of 195 Hispanics from all income
categories. The populations of all other minorities make up a very small population in the City
of Dover. According to the 2010 Census data, there are 2.7% of Asians, and 0.5% American
Indians/Alaska Natives and 0.1% of Pacific Islanders in the City. This minority population is not
experiencing any severe housing problems.
Consolidated Plan DOVER 23
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 153
NA-25 Disproportionately Greater Need: Housing Cost Burdens – 91.205 (b)(2)
Assess the need of any racial or ethnic group that has disproportionately greater need in comparison to
the needs of that category of need as a whole.
Introduction:
The following tables outline the disproportionately greater needs related to the housing cost
burden in the City of Dover.
Housing Cost Burden
Housing Cost Burden <=30% 30-50% >50% No / negative
income (not
computed)
Jurisdiction as a whole 8,875 2,550 2,155 105
White 5,600 1,140 895 90
Black / African American 2,635 1,055 1,040 0
Asian 120 135 10 0
American Indian, Alaska
Native 10 0 0 0
Pacific Islander 0 0 0 0
Hispanic 330 180 130 0
Table 21 – Greater Need: Housing Cost Burdens AMI
Data Source: 2007-2011 CHAS
Discussion:
In the City of Dover, approximately 71% of households spend less than 30% of their income on
housing costs with 45% of white households spending less than 30% of their income on housing
cost and 21% of African Americans spending less than 30% of their income on housing cost.
The remainder of the minority populations identified in the table above is disproportionately
represented because only 4% of this population is in this category.
A little over 20% of all households spend between 30% and 50% of their income on housing.
With white households spending 9% of their income on housing cost and 8% of African
American households spending 8% of their income on housing cost. The remainders of the
minority population identified are disproportionately affected with 1% of the Asian population
and 1% of Hispanic population paying between 30% and 50% of their income on housing with
Asians making up 2.7% of the population in Dover and Hispanics making up 6.6% of the
population in Dover. There were no American Indians/ Alaska Natives and Pacific Islanders
included in this category.
A total of 17% of all households spend more than 50% of their income on housing with 0.84% of
the population has no income or it was not tabulated.
Consolidated Plan DOVER 24
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 154
NA-30 Disproportionately Greater Need: Discussion – 91.205(b)(2)
Are there any Income categories in which a racial or ethnic group has disproportionately
greater need than the needs of that income category as a whole?
Based on the current 2010 Census data, Dover has a very small concentration of the following
ethnic groups: American Indian and Alaska Native 0.5%, Pacific Islander 0.1%, Asian 2.7% and
6.6% Hispanic. Because of the very small concentration of these ethnic groups, there is not a
disproportionate impact in any of the income categories.
Under the disproportionately housing needs and severe housing problems, American
Indians/Alaska Natives, Pacific Islanders and Asians are not disproportionately affected
identifying no housing problems in any of the income categories. However, African Americans
and Whites have disproportionately greater housing and severe housing problems in all income
categories, with Hispanics having less than 13% of any housing problems in all income
categories.
If they have needs not identified above, what are those needs?
In addition to affordable housing that meets the housing code, and higher incomes needed to
afford housing in Delaware, transportation appears to be an issue for low incomes persons that
do not have a vehicle. Public transportation in the City of Dover does not have service after
6:00 pm making it very difficult for this population to commute to other towns outside of Dover
for employment.
Are any of those racial or ethnic groups located in specific areas or neighborhoods in your
community?
Based on 2010 Census data, 59% of African Americans make up the population in the Central
Dover Downtown Target Area.
Consolidated Plan DOVER 25
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 155
NA-35 Public Housing – 91.205(b)
Introduction
Dover Housing Authority (DHA) is the local Housing Authority that serves the City of Dover. DHA has a total of 374 public housing
units available for occupancy including 31 scattered site units. The majority of these units are 3 bedrooms. DHA also provides rental
assistance to low and moderate income persons through HUD’s Section 8 Program. Presently there are 174 housing choice vouchers
under lease and tenant based which means they are only offered to tenants on DHA’s waiting list.
Totals in Use
Program Type
Certificate Mod- Public Vouchers
Rehab Housing Total Project - Tenant - Special Purpose Voucher
based based Veterans Family Disabled
Affairs Unification *
Supportive Program
Housing
# of units vouchers in use 0 0 280 174 0 174 0 0 7
Table 22 - Public Housing by Program Type
*includes Non-Elderly Disabled, Mainstream One-Year, Mainstream Five-year, and Nursing Home Transition
Data Source: PIC (PIH Information Center)
Characteristics of Residents
Program Type
Certificate Mod- Public Vouchers
Rehab Housing Total Project - Tenant - Special Purpose Voucher
based based Veterans Family
Affairs Unification
Supportive Program
Housing
Average Annual Income 0 0 10,427 14,504 0 14,379 0 0
Consolidated Plan DOVER 26
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 156
Program Type
Certificate Mod- Public Vouchers
Rehab Housing Total Project - Tenant - Special Purpose Voucher
based based Veterans Family
Affairs Unification
Supportive Program
Housing
Average length of stay 0 0 5 5 0 5 0 0
Average Household size 0 0 2 2 0 2 0 0
# Homeless at admission 0 0 0 0 0 0 0 0
# of Elderly Program Participants
(>62) 0 0 25 42 0 38 0 0
# of Disabled Families 0 0 68 32 0 28 0 0
# of Families requesting accessibility
features 0 0 280 174 0 174 0 0
# of HIV/AIDS program participants 0 0 0 0 0 0 0 0
# of DV victims 0 0 0 0 0 0 0 0
Table 23 – Characteristics of Public Housing Residents by Program Type
Data Source: PIC (PIH Information Center)
Race of Residents
Program Type
Race Certificate Mod- Public Vouchers
Rehab Housing Total Project - Tenant - Special Purpose Voucher
based based Veterans Family Disabled
Affairs Unification *
Supportive Program
Housing
White 0 0 35 32 0 30 0 0 2
Black/African American 0 0 244 139 0 130 0 0 5
Consolidated Plan DOVER 27
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 157
Program Type
Race Certificate Mod- Public Vouchers
Rehab Housing Total Project - Tenant - Special Purpose Voucher
based based Veterans Family Disabled
Affairs Unification *
Supportive Program
Housing
Asian 0 0 0 1 0 1 0 0 0
American Indian/Alaska
Native 0 0 0 2 0 2 0 0 0
Pacific Islander 0 0 1 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0
*includes Non-Elderly Disabled, Mainstream One-Year, Mainstream Five-year, and Nursing Home Transition
Table 24 – Race of Public Housing Residents by Program Type
Data Source: PIC (PIH Information Center)
Ethnicity of Residents
Program Type
Ethnicity Certificate Mod- Public Vouchers
Rehab Housing Total Project - Tenant - Special Purpose Voucher
based based Veterans Family Disabled
Affairs Unification *
Supportive Program
Housing
Hispanic 0 0 22 11 0 11 0 0 0
Not Hispanic 0 0 258 163 0 152 0 0 7
*includes Non-Elderly Disabled, Mainstream One-Year, Mainstream Five-year, and Nursing Home Transition
Table 25 – Ethnicity of Public Housing Residents by Program Type
Data Source: PIC (PIH Information Center)
Consolidated Plan DOVER 28
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 158
Section 504 Needs Assessment: Describe the needs of public housing tenants and applicants
on the waiting list for accessible units:
The majority of Section 504 requests are for wheel chair accessible units and requests for one-
level units. The request of elderly tenants is for handrails to be installed in the bathrooms.
Most immediate needs of residents of Public Housing and Housing Choice voucher holders
Several families have requested additional locks on the entrance doors and windows to ensure
their disabled children do not open the doors and windows and are able to exit the unit. There
is also a challenge for Housing Choice Vouchers holders to find affordable housing that is in
compliance with the City’s Housing Code and affordable housing that is accessible for persons
with disabilities.
How do these needs compare to the housing needs of the population at large
The needs of Dover Housing Authority and the needs of the population at large are comparable
in locating decent affordable housing for low and very income persons as well as the need for
accessible housing units for persons with disabilities.
Discussion
Consolidated Plan DOVER 29
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 159
NA-40 Homeless Needs Assessment – 91.205(c)
Introduction:
This section provides data on homelessness from a point in time count on January 28, 2014 conducted by the Homeless Planning
Council who is the lead agency of the Continuum of Care (CoC) for the State of Delaware. Over the next five years, the City will
provide CDBG funding to homeless providers to reduce the risk of homelessness in the City of Dover.
Homeless Needs Assessment
Population Estimate the # of persons Estimate the # Estimate the # Estimate the # Estimate the #
experiencing experiencing becoming exiting of days persons
homelessness on a given homelessness homeless each homelessness experience
night each year year each year homelessness
Sheltered Unsheltered
Persons in households with
51 0 268 216 114 28,984
Adult(s) and Child(ren)
Persons in Households with
Only Children 0 0 2 2 2 8
Persons in Households with
Only Adults 79 0 436 390 158 28,022
Chronically Homeless
8 0 87 83 19 3,928
Individuals
Chronically Homeless
Families 2 0 17 15 4 1,741
Veterans 4 0 39 37 18 2,863
Unaccompanied Child 0 0 5 4 3 957
Persons with HIV 0 0 89 89 39 3,528
Source: CMIS; 2014 ES and TH project stays and unsheltered counts
Consolidated Plan DOVER 30
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 160
If data is not available for the categories "number of persons becoming and exiting homelessness each year," and "number of
days that persons experience homelessness," describe these categories for each homeless population type (including chronically
homeless individuals and families, families with children, veterans and their families, and unaccompanied youth):
Consolidated Plan DOVER 31
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 161
Nature and Extent of Homelessness: (Optional)
Race: Sheltered: Unsheltered (optional)
Ethnicity: Sheltered: Unsheltered (optional)
Estimate the number and type of families in need of housing assistance for families with
children and the families of veterans.
The 2014 Point in Time Count conducted by the Homeless Planning Council for the State of
Delaware extracted data for Dover and estimated the number of specific populations that
experienced homelessness during the year. There were 268 adults and children, 2 with only
children, 17 chronically homeless families and 39 veterans that were homeless during the year.
Describe the Nature and Extent of Homelessness by Racial and Ethnic Group.
Data was not available from the Homeless Planning Council for Dover.
Describe the Nature and Extent of Unsheltered and Sheltered Homelessness.
Of the population that was sheltered on a given night, there were 51 persons in households
with adults and children, 79 households with only adults, 8 chronically homeless individuals, 2
chronically homeless families and 4 veterans. There was no data for this population
experiencing homelessness on a given night.
Discussion:
The City of Dover fully supports the Homeless Planning Council initiative to end Chronic
Homeless in Delaware by 2017. Although Dover’s rate of homelessness is considerably lower
than the remainder of the state, there is still a lack of affordable housing and emergency
shelters that service the needs of the homeless population in Dover. Over the next five years,
the City will provide CDBG assistance to homeless providers to assist in reducing chronic
homelessness in Dover.
Consolidated Plan DOVER 32
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 162
NA-45 Non-Homeless Special Needs Assessment - 91.205 (b,d)
Introduction:
The special needs population consists of persons that are elderly and frail and elderly; persons
with mental, physical, and/or developmental disabilities; persons with alcohol or drug
addiction; persons with HIV/AIDS and victims of domestic violence, sexual assault and stalking.
Due to the high cost of living in the State of Delaware, it has become very challenging for this
population to find decent affordable housing. The City will continue to provide support for
agencies that service this population and will continue to be a priority to service this population
over the next five years.
Describe the characteristics of special needs populations in your community:
Based on 2011 American Census Survey data, the population for the City of Dover is 35,849. Of
that total, 14.4% are people that are age 65 and older. Individual data for persons with mental
health, developmental disabilities, substance abuse and domestic violence was not available for
the City of Dover.
What are the housing and supportive service needs of these populations and how are these
needs determined?
Based on consultation from local housing providers that service the needs of these populations,
the following has been determined:
A need for additional supportive services to assist persons with special needs
A need to incorporate universal design and accessibility standards to meet the needs of
the disabled population
A need for permanent supportive housing to address the needs of the homeless and
those at risk of becoming homeless.
A need for decent affordable rental housing that meets the City’s Housing Code to
house people with special needs.
Discuss the size and characteristics of the population with HIV/AIDS and their families within
the Eligible Metropolitan Statistical Area:
Based on data received from the Division of Health and Human Services, there are
approximately 618 people with HIV/AIDS living in Kent County as of March 2015. As of March
2014, 203 low income persons are on the waiting list for housing and services in the State of
Delaware with the average wait time of 5 years.
Consolidated Plan DOVER 33
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 163
NA-50 Non-Housing Community Development Needs – 91.215 (f)
Describe the jurisdiction’s need for Public Facilities:
The City funds facilities that service the special needs population such as homeless facilities
through its CDBG allocation. Most of these facilities are older buildings that are in need of
maintenance and repair. Public Facility needs on a larger scale include additional parking
facilities needed in the downtown area and renovations or construction of city government
buildings due to aging of its buildings requiring several upgrades and overcrowding of
employees due to lack of space. Long range plans include recreation facilities that will service
the youth in our community which includes plans for a splash pad and a skate park. Due to
funding constraints, it is likely that the City will improve and expand its existing parks and
recreational facilities.
How were these needs determined?
Subrecipients identify the needs for public facility improvements for projects that are funded
with CDBG funds regarding physical improvements needed to their facilities. For other larger
scale projects that are not funded with CDBG funds, public facility needs are determined by City
Staff, Advisory Review Committees, Recreational Needs Assessments and a small group of
citizens.
Describe the jurisdiction’s need for Public Improvements:
Many of the older neighborhoods in Dover have a high concentration of low to moderate
income persons and were built from the early 1900’s through the fifties and sixties. Due to the
age of these areas, they are in need of maintenance and public improvements. As part of
Dover’s Capital Improvement Plan, City Council recently approved some concrete and asphalt
work to be completed on West Street which is located in the Downtown Target Area and the
location of the Inner City Cultural League which is a public facility that provides fine arts and
culture to youth and their families in the community. Over the next two years, the City has
identified the following improvements to be completed at various locations throughout the
City:
Removal and replacement of falling concrete infrastructure
Road restoration of roads in the City
Upgrade of existing water main and appurtenances within the Downtown Target Area
Emergency repairs attributed to inflow and infiltration issues within the City
How were these needs determined?
The City’s needs for public improvements were determined from citizen complaints, City Public
Works Crews, legislative and City Staff. The City then developed long range goals for the
projects that are most in need to be completed over the next five years. The City will receive
Consolidated Plan DOVER 34
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 164
Capital Project funding and Community Transportation funding to complete these projects in
addition to the use of City funds.
Describe the jurisdiction’s need for Public Services:
The City provides the majority of its public services through the CDBG program. Each program
year, the City allocates 15% of its CDBG allocation towards public service activities. Due to
homelessness in Dover having a high priority, the City has consistently provided CDBG funding
to homeless providers to address this need. Crime Prevention is also another high priority
public service need in the City which is addressed through grant funding from the police
department, who recently hired cadets to do community policing in high crime areas of the
City.
How were these needs determined?
Through the citizen participation process, the City prioritized information received from the
community development needs online survey and from focus groups and stakeholder meetings
in developing the Consolidated Plan and other initiatives from other non-profit agencies and
housing providers. Through this process, funding priorities were established based on the needs
identified and the availability of funding sources to address those needs.
Consolidated Plan DOVER 35
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 165
Housing Market Analysis
MA-05 Overview
Housing Market Analysis Overview:
The high cost of housing in Dover and Kent County continues to be a barrier to providing
affordable owner-occupied and rental housing for low to moderate income persons. The City is
working in conjunction with other housing providers and non-profit organizations on several
initiatives and incentives that will promote homeownership and preserve the existing housing
stock through the homeowner rehabilitation and emergency home repair programs.
Consolidated Plan DOVER 36
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 166
MA-10 Number of Housing Units – 91.210(a)&(b)(2)
Introduction
There are 14,547 housing units in the City of Dover based on the 2007-2011 American Census
Survey (ACS) data. Of that total, there are 7,016 owner units and 5,587 renter units. The
greatest percentage of units is 1-unit detached structures at 6,808 comprising 47% of the units.
Units in residential properties with 5-19 units are the second highest percentage in property
type with 2,708 units or 19%. Housing units with 20 or more make up only 9% of all housing
units, and only 5% of the units are mobile homes, boats, RV’s and vans etc. Three (3) or more
bedrooms dominate the unit size by tenure making up 86% among homeowners. Two (2)
bedrooms dominate among renters making up 41% with 3 bedrooms at 29% and 1 bedroom at
28% for rental units. Ownership units are predominately of lower density single family detached
units on individual lots and medium density apartment units are on a shared open space.
All residential properties by number of units
Property Type Number %
1-unit detached structure 6,808 47%
1-unit, attached structure 2,299 16%
2-4 units 675 5%
5-19 units 2,708 19%
20 or more units 1,288 9%
Mobile Home, boat, RV, van, etc 769 5%
Total 14,547 100%
Table 26 – Residential Properties by Unit Number
Data Source: 2007-2011 ACS
Unit Size by Tenure
Owners Renters
Number % Number %
No bedroom 15 0% 115 2%
1 bedroom 41 1% 1,569 28%
2 bedrooms 952 14% 2,285 41%
3 or more bedrooms 6,008 86% 1,618 29%
Total 7,016 101% 5,587 100%
Table 27 – Unit Size by Tenure
Data Source: 2007-2011 ACS
Describe the number and targeting (income level/type of family served) of units assisted with
federal, state, and local programs.
Consolidated Plan DOVER 37
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 167
The City of Dover is served by two public housing authorities: the Dover Housing Authority
(DHA) and the Delaware State Housing Authority (DSHA). The two housing authorities operate
public housing units within the City of Dover. Dover Housing Authority administers 170 Section
8 Housing Choice Vouchers with a total of 374 public and subsidized housing units. DSHA has
955 Housing Choice Vouchers and 508 public housing units. The two housing authorities
service the low and the very low income families. The City of Dover provides CDBG funding to
the Homeownership Assistance Program that services persons that are 80% and below the Area
Median Income by providing down payment assistance to first-time homebuyers who want to
purchase affordable housing in the City.
Provide an assessment of units expected to be lost from the affordable housing inventory for
any reason, such as expiration of Section 8 contracts.
There will not be a loss of units.
Does the availability of housing units meet the needs of the population?
The fact that there are 843 people on the waiting list for public housing and 635 people on the
waiting list for Housing Choice Vouchers indicates there is a high demand for affordable housing
in the City of Dover. Currently there are 1,520 renters and 570 homeowners paying more than
50% of their income on housing. These numbers indicate there is a need for approximately
3,600 affordable housing units.
Describe the need for specific types of housing:
Special needs housing for those that are handicapped, elderly, mentally challenged, suffering
from substance abuse and individuals with HIV/AIDS continues to be a need. Most often this
population is characterized as being a cost burden and paying over 50% of their income on
housing. In addition, families with children that are low income continue to have a need for
affordable housing due to overcrowding.
Discussion
The City’s goals are to continue to preserve the existing housing stock as well as increase the
incentives to provide affordable housing for the populations identified. There are several
initiatives in place to revitalize the Central Dover Target Area in low to moderate income areas
that include constructing affordable housing, providing homeownership assistance and
incentives for first time homebuyers who purchase properties in the target areas, and make
homeowner repairs to home found in violation of the City’s Housing Code.
Consolidated Plan DOVER 38
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 168
MA-15 Housing Market Analysis: Cost of Housing - 91.210(a)
Introduction
Based on data from the 2007-2011 American Census Survey (ACS) data, the median home value
increased 80% from $107,700 in 2000 to $193,900 in 2011. Housing cost for renters also
increased 49% over the past 11 years indicating a need for affordable rental housing in the City
of Dover.
Cost of Housing
Base Year: 2000 Most Recent Year: 2011 % Change
Median Home Value 107,700 193,900 80%
Median Contract Rent 521 778 49%
Table 28 – Cost of Housing
Data Source: 2000 Census (Base Year), 2007-2011 ACS (Most Recent Year)
Rent Paid Number %
Less than $500 1,279 22.9%
$500-999 3,344 59.9%
$1,000-1,499 885 15.8%
$1,500-1,999 58 1.0%
$2,000 or more 21 0.4%
Total 5,587 100.0%
Table 29 - Rent Paid
Data Source: 2007-2011 ACS
Housing Affordability
% Units affordable to Households Renter Owner
earning
30% HAMFI 635 No Data
50% HAMFI 1,340 375
80% HAMFI 3,215 1,090
100% HAMFI No Data 2,034
Total 5,190 3,499
Table 30 – Housing Affordability
Data Source: 2007-2011 CHAS
Consolidated Plan DOVER 39
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 169
Monthly Rent
Monthly Rent ($) Efficiency (no 1 Bedroom 2 Bedroom 3 Bedroom 4 Bedroom
bedroom)
Fair Market Rent 649 830 984 1,378 1,738
High HOME Rent 0 0 0 0 0
Low HOME Rent 0 0 0 0 0
Table 31 – Monthly Rent
Data Source: HUD FMR and HOME Rents
Is there sufficient housing for households at all income levels?
Housing is needed for all income levels but there is a greater need for affordable housing for
low and very low income persons in the City of Dover.
How is affordability of housing likely to change considering changes to home values and/or
rents?
Over the past 11 years, the rental rates in Dover have increased over 49% and most likely will
continue to rise over time with a decrease in affordable rental housing units. The median home
value had an even higher increase by 80% from 2000 to 2011. With home values expected to
rise over time, affordable housing will become an issue if production of affordable housing is
not constructed over time.
How do HOME rents / Fair Market Rent compare to Area Median Rent? How might this
impact your strategy to produce or preserve affordable housing?
The City of Dover and Dover Housing Authority do not receive HOME funds; however the Fair
Market Rent for a 2 bedroom rental unit is higher than the most recent median contract rent by
$206. This presents an issue for persons that do not live in subsidized housing that are low
income and paying over 50% of their income on housing. With the lack of affordable rental
housing, it will also be difficult for persons with Housing Choice Vouchers to find suitable
housing.
Discussion
The City of Dover is collaborating with other local housing providers on several initiatives to
provide affordable housing in low to moderate income target areas as well as city-wide by
providing homeownership assistance to first time home buyers who purchase properties within
the City of Dover and designated target areas, provide real estate tax relief over a 4 year period
for persons that purchase properties within the designated target area, receive a transfer tax
rebate for properties upon issuance of a Certificate of Occupancy for properties purchased
after March 1,2015 within the designated target area, and partnering with non-profits that will
be constructing affordable housing for low income persons over the next few years.
Consolidated Plan DOVER 40
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 170
MA-20 Housing Market Analysis: Condition of Housing – 91.210(a)
Introduction
This section provides data on the condition of housing stock in the City of Dover and defines the
characteristics of substandard housing.
Definitions
HUD defines substandard housing which is dilapidated, without operable indoor plumbing or a
useable flush toilet or bathtub inside the unit for the family’s exclusive use, without electricity
or with inadequate or unsafe electrical service, without a safe or adequate source of heat, and
should but does not have a kitchen, or has otherwise been declared unfit for habitation by the
government.
HUD defines standard housing as decent, safe, sanitary and in good repair.
Condition of Units
Condition of Units Owner-Occupied Renter-Occupied
Number % Number %
With one selected Condition 2,038 29% 2,680 48%
With two selected Conditions 137 2% 43 1%
With three selected Conditions 0 0% 0 0%
With four selected Conditions 0 0% 0 0%
No selected Conditions 4,841 69% 2,864 51%
Total 7,016 100% 5,587 100%
Table 32 - Condition of Units
Data Source: 2007-2011 ACS
Year Unit Built
Year Unit Built Owner-Occupied Renter-Occupied
Number % Number %
2000 or later 1,060 15% 930 17%
1980-1999 2,321 33% 1,852 33%
1950-1979 2,905 41% 2,234 40%
Before 1950 730 10% 571 10%
Total 7,016 99% 5,587 100%
Table 33 – Year Unit Built
Data Source: 2007-2011 CHAS
Consolidated Plan DOVER 41
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 171
Risk of Lead-Based Paint Hazard
Risk of Lead-Based Paint Hazard Owner-Occupied Renter-Occupied
Number % Number %
Total Number of Units Built Before 1980 3,635 52% 2,805 50%
Housing Units build before 1980 with children present 790 11% 554 10%
Table 34 – Risk of Lead-Based Paint
Data Source: 2007-2011 ACS (Total Units) 2007-2011 CHAS (Units with Children present)
Vacant Units
Suitable for Not Suitable for Total
Rehabilitation Rehabilitation
Vacant Units 350 5 355
Abandoned Vacant Units
REO Properties
Abandoned REO Properties
Table 35 - Vacant Units
Data for Abandoned vacant units, REO properties and abandoned REO properties was not
available.
Need for Owner and Rental Rehabilitation
Homeowner Rehabilitation has been identified as a high priority in determining the needs for
the City of Dover by stakeholders from the City’s first public hearing. The City’s central Target
Area has the highest percentage of older homes throughout the City which is in need of
homeowner rehabilitation assistance and rental rehabilitation.
Estimated Number of Housing Units Occupied by Low or Moderate Income Families with LBP
Hazards
Among owner-occupied units, 52% or 3,635 units were constructed before 1980 with 11% of
these units having children present, and 2,805 or 50% of rental units were constructed prior to
1980 with 10% of the units having children present is a high risk for lead based paint for
housing units constructed at the time. There are approximately 4,955 households that are 80%
and below the Area Median Income representing 40% of all households. Based on this number
and the percentages of owner and renter occupied households with potential lead –based paint
hazards, there are potentially 3,500 units occupied by low or moderate income families that
contain lead based paint hazards.
Consolidated Plan DOVER 42
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 172
MA-25 Public and Assisted Housing – 91.210(b)
Introduction
Dover Housing Authority (DHA) is the local Housing Authority that services the City of Dover.
DHA owns and operates a total of 374 public housing and subsidized units. DHA is a high
performing Public Housing Authority scoring 92 out of 100. Delaware State Housing Authority
operates one public housing development in the City of Dover that has 108 housing units.
Totals Number of Units
Program Type
Certificate Mod- Public Vouchers
Rehab Housing Total Project - Tenant - Special Purpose Voucher
based based Veterans Family Disabled
Affairs Unification *
Supportive Program
Housing
# of units
vouchers
available 298 170 170 0 0 22
# of accessible
units
*includes Non-Elderly Disabled, Mainstream One-Year, Mainstream Five-year, and Nursing Home Transition
Table 36 – Total Number of Units by Program Type
Data PIC (PIH Information Center)
Source:
Describe the supply of public housing developments:
Dover Housing Authority provides rental assistance through Section 8 and public housing units
as well as operates and manages two public housing units for senior citizens and persons that
are disabled. DHA manages 5 scattered site areas throughout Dover and maintain and operate
17 tax credit units.
Describe the number and physical condition of public housing units in the jurisdiction,
including those that are participating in an approved Public Housing Agency Plan:
DHA has identified the physical condition of their properties in their 5-year Physical Needs
Assessment. They are in the process of determining the projects with the greatest need and
fully renovating and upgraded those properties that have been prioritized with the greatest
need.
Consolidated Plan DOVER 43
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 173
Public Housing Condition
Public Housing Development Average Inspection Score
Dover Housing Authority 92
Table 37 - Public Housing Condition
Describe the restoration and revitalization needs of public housing units in the jurisdiction:
The needs of the housing authority as identified in DHA’s 5-year plan include:
Upgrade of HVAC system at Hayes Circle, Manchester Court, Derby Estates and Queen
Manor
Restriping and repaving all public housing parking areas
Roofing upgrades
Kitchen floor upgrades
Bathroom upgrades
Heater room door upgrades
Describe the public housing agency's strategy for improving the living environment of low-
and moderate-income families residing in public housing:
DHA completes an annual and 5-year plan in which they conduct a Physical Needs Assessment
of their public housing inventory and determine the projects need to be completed in order of
priority. Within the 5-year plan, they determine the importance and rank of each project. The
funding they use to improve the living environment of their families comes from their Capital
Fund Program and their Operating Subsidy funds.
Consolidated Plan DOVER 44
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 174
MA-30 Homeless Facilities and Services – 91.210(c)
Introduction
The City of Dover is committed to the challenge to end homelessness and serves as a member of the Delaware Interagency
Homeless Council to oversee the implementation of the ten year plan to end chronic homelessness and educate the community
about the need and advantages of ending chronic homelessness. The City has been consistent by proving support and CDBG funding
to housing providers that service the homeless population.
Facilities and Housing Targeted to Homeless Households
Emergency Shelter Beds Transitional Permanent Supportive Housing
Housing Beds Beds
Year Round Beds Voucher / Seasonal Current & New Current & New Under
(Current & New) / Overflow Beds Development
Households with Adult(s) and
Child(ren) 51 0 26 0 0
Households with Only Adults 65 5 4 5 0
Chronically Homeless Households 0 0 0 5 0
Veterans 0 0 0 0 0
Unaccompanied Youth 3 0 5 0 0
Table 38 - Facilities and Housing Targeted to Homeless Households
Consolidated Plan DOVER 45
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 175
Describe mainstream services, such as health, mental health, and employment services to the
extent those services are used to complement services targeted to homeless persons
Mainstream services are available throughout the State of Delaware for homeless persons
including Kent County which services Dover. The homeless housing providers that shelter the
homeless work in connection with mainstream service providers to address the needs of the
homeless. Services such as medical care, substance abuse counseling and mental health
counseling are available through individual medical insurance which can be applied for at the
local State Service Center. They get employment services through the Department of Labor and
income support such as Social Security, child support and TANF through the Social Security
Administration and the local State Service Center.
List and describe services and facilities that meet the needs of homeless persons, particularly
chronically homeless individuals and families, families with children, veterans and their
families, and unaccompanied youth. If the services and facilities are listed on screen SP-40
Institutional Delivery Structure or screen MA-35 Special Needs Facilities and Services,
describe how these facilities and services specifically address the needs of these populations.
Salvation Army - This organization carries out crisis alleviation through the administration of
Federal Emergency Management Agency (FEMA) shelter, utilities, rent and mortgage assistance
programs. It also coordinates and refers people to shelters, motels, and local service providers.
Its youth activities included: the After School Achievement Program (ASAP), summer camp,
Alternative School, Christmas toy and food donations. The adult programs include: nursing
home and prison visitation, daily hot meal program, home league mothers support, GED
education and basketball leagues.
Eight-O-One Life Encompassing Living Program - This program houses adolescent’s ages 10-18
years old in a crisis situation for a thirty-day period. It also provides diagnostic treatment
services to adolescents and AFDC recipients who have been determined to be "at risk" for being
abused and neglected. This facility has 12 beds.
Shepherd Place, Inc. - This agency operates a relief shelter for homeless women and children
only. It provides emergency food baskets, information and referral services, and transportation
for in house clients. The services are available on a 24-hour basis, the average stay at the
shelter is 2-3 weeks, but does not exceed 30 days. The facility has 20 beds and is located just
beyond the City limits.
People’s Place II – (Formerly known as Whatcoat Social Service Agency: Ruth M. Dorsey Shelter)
This agency operates a relief shelter for homeless persons. It provides emergency food baskets,
information and referral services, and transportation for in house clients. The services are
available on a 24-hour basis, the average stay at the shelter is 2-3 weeks, but does not exceed
30 days. This facility has 46 beds.
Consolidated Plan DOVER 46
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 176
Connections Community Support Program - This agency is one of the largest housing providers
in the State of Delaware that services homeless and the special needs population. The following
is a list of mainstream services that they provide:
Community Housing Program for people who are homeless and people with mental
health/or substance abuse problems
Rental subsidies for people who incomes are 50% below the area median income who
need assistance their rent and utilities
Licensed group homes for adults with mental health conditions who need personal care
assistance
Community living arrangements with in-home supports with adults with intellectual
disabilities
Residential alternatives to detention for youth involved with the juvenile justice system
Emergency shelter for homeless families and transitional housing for veterans and
veterans’ families
Oxford Houses which offer alcohol and drug free, democratically run, community
housing alternatives for people who are recovering from substance use conditions.
Dover Interfaith Mission for Housing – This agency is a non-profit organization that operates a
shelter for homeless men and provides services to the homeless to assist in obtaining
permanent affordable housing.
Elizabeth Murphey School - This agency is a non-profit group home that services up to 40
neglected and abused children that have been identified as being homeless on an annual basis.
Consolidated Plan DOVER 47
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 177
MA-35 Special Needs Facilities and Services – 91.210(d)
Introduction
There are some individuals in the special needs population that may have difficulties in finding
social service facilities as well as supportive services and housing services due to their needs.
HUD’s definition of the special needs population includes the frail and non-frail elderly, persons
with physical, mental, or behavioral disabilities, and persons with HIV/AIDS, persons with
alcohol or drug addictions.
Including the elderly, frail elderly, persons with disabilities (mental, physical, developmental),
persons with alcohol or other drug addictions, persons with HIV/AIDS and their families,
public housing residents and any other categories the jurisdiction may specify, and describe
their supportive housing needs
The special needs population identified need the following supportive housing needs:
Increase in supportive services that allow persons with special needs to live
independently
Increase in supply of affordable, accessible units for sale and rent
Increase in government funding for homeless services, particularly emergency shelters
Increase in affordable, assisted living choices for seniors
Describe programs for ensuring that persons returning from mental and physical health
institutions receive appropriate supportive housing
There are few programs in Dover that provide supportive housing for persons with mental and
physical health conditions. The majority of these programs are provided by the Division of
Health and Social Services throughout the State of Delaware.
Serenity Place is a substance abuse treatment facility located in Dover that provides
residential long term treatment and has 10 licensed beds.
National Alliance of Mental Illness (NAMI) is a non-profit organization which helps
mentally ill persons and their families cope with problems created by the illness. In
addition, they develop affordable housing for persons with chronic mental illness.
NAMI services all three counties in Delaware.
Division of Substance Abuse and Mental Health assist those who suffer from mental
illness and substance abuse access treatment and prevention for mental health
substance abuse conditions and serves all three counties in Delaware.
Dover Behavioral Health facility provides inpatient and outpatient treatment to
adolescents and adults who suffer from mental health conditions and addictions
Connections Community Support Program provides community based treatment,
support, and housing and rehabilitation services for people recovering from mental
Consolidated Plan DOVER 48
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 178
health and substance abuse disorders, homelessness and HIV/AIDS and serves all
three counties in the State of Delaware.
Specify the activities that the jurisdiction plans to undertake during the next year to address
the housing and supportive services needs identified in accordance with 91.215(e) with
respect to persons who are not homeless but have other special needs. Link to one-year
goals. 91.315(e)
Over the next year, the City of Dover has designated CDBG funding to housing providers that
service the homeless and those that are at risk of becoming homeless by providing rental
assistance / rapid rehousing services that will provide security deposits and rental assistance for
up to three months to assist renters who qualify for affordable rental housing.
The City will continue to provide CDBG funding for the Homeowner Rehabilitation and
Emergency Home Repair program to assist those that are 80% and below the area median
income as well as those that are elderly and disabled who need repairs to their homes.
For entitlement/consortia grantees: Specify the activities that the jurisdiction plans to
undertake during the next year to address the housing and supportive services needs
identified in accordance with 91.215(e) with respect to persons who are not homeless but
have other special needs. Link to one-year goals. (91.220(2))
See response above.
Consolidated Plan DOVER 49
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 179
MA-40 Barriers to Affordable Housing – 91.210(e)
Negative Effects of Public Policies on Affordable Housing and Residential Investment
At this time, it is the City of Dover’s contention that there are no significant barriers to
affordable housing which describes dwelling units whose total cost are deemed affordable to
those who have a median income. However, there are few constraints that may be an obstacle
in constructing affordable housing such as development impact fees which increases the cost to
develop new housing, land use policies outlined in the City’s Comprehensive Plan, and building
and zoning codes.
Unlike many communities, Dover has not practiced “exclusionary zoning” where most of the
undeveloped land is designated for large lot single family detached homes. To the contrary,
The Dover Plan (Dover’s Comprehensive Plan) designates a large portion of undeveloped lands
for medium density housing, and a smaller but significant portion for high density housing. The
land is subsequently zoned accordingly, permitting a range of residential densities and housing
types. The most recent 2008 Comprehensive Plan Update was adopted in February 2009 with
amendments in November 2009, March 2011, April 2011, March 2012, and March 2014. The
Land Development Plan specifically identifies a range of residential land uses from low density
to high density throughout the City. The plan continues to recommend a range of residential
densities and focuses specifically on housing in one chapter.
The City of Dover is currently working on several revitalization and housing initiatives in
collaboration with other local housing providers that will assist in reducing the barriers to
affordable housing. The following is an outline of incentives and goals to promote affordable
housing in the City of Dove within designated target areas:
Incentives
Provide up to 20% cash rebate for qualifying construction projects (capped at $1
million/property)
A transfer tax rebate of the buyer’s portion of the real estate tax upon issuance of a
Certificate of Occupancy
Waiver of building, plumbing, mechanical and fire protection permit fees
Waiver of City sewer and water impact fees
10 year abatement of property tax on the value of improvements
Up to $20,000 in down payment cost to purchase affordable housing
Property tax abatement for first-time homebuyers who purchase property in the
Redevelopment Target Area that occupy the home as their principal residence for
four years
Consolidated Plan DOVER 50
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 180
Goals
Encourage greater zoning flexibility to enable infill housing development in the
Downtown Redevelopment District by relaxing setback and block standard
requirements to allow condominiums and townhouse styles of housing.
Explore land banking and land trust options for assembling parcels and
redevelopment efforts.
Strengthen existing housing by expanding the Home Repair Programs
Consolidated Plan DOVER 51
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 181
MA-45 Non-Housing Community Development Assets – 91.215 (f)
Introduction
Economic Development Market Analysis
Business Activity
Business by Sector Number of Number of Jobs Share of Workers Share of Jobs Jobs less workers
Workers % % %
Agriculture, Mining, Oil & Gas Extraction 54 40 1 0 -1
Arts, Entertainment, Accommodations 1,788 4,760 19 23 4
Construction 415 296 4 1 -3
Education and Health Care Services 2,245 6,161 24 30 6
Finance, Insurance, and Real Estate 601 978 6 5 -1
Information 193 488 2 2 0
Manufacturing 858 985 9 5 -4
Other Services 456 1,229 5 6 1
Professional, Scientific, Management Services 518 1,204 6 6 0
Public Administration 0 0 0 0 0
Retail Trade 1,663 3,961 18 19 1
Transportation and Warehousing 335 254 4 1 -3
Wholesale Trade 274 446 3 2 -1
Total 9,400 20,802 -- -- --
Table 39 - Business Activity
Data Source: 2007-2011 ACS (Workers), 2011 Longitudinal Employer-Household Dynamics (Jobs)
Consolidated Plan DOVER 52
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 182
Labor Force
Total Population in the Civilian Labor Force 16,097
Civilian Employed Population 16 years and over 14,595
Unemployment Rate 9.33
Unemployment Rate for Ages 16-24 19.85
Unemployment Rate for Ages 25-65 4.75
Table 40 - Labor Force
Data Source: 2007-2011 ACS
Occupations by Sector Number of People
Management, business and financial 2,997
Farming, fisheries and forestry occupations 649
Service 1,955
Sales and office 3,927
Construction, extraction, maintenance and
repair 994
Production, transportation and material moving 962
Table 41 – Occupations by Sector
Data Source: 2007-2011 ACS
Travel Time
Travel Time Number Percentage
< 30 Minutes 12,018 78%
30-59 Minutes 2,234 14%
60 or More Minutes 1,247 8%
Total 15,499 100%
Table 42 - Travel Time
Data Source: 2007-2011 ACS
Education:
Educational Attainment by Employment Status (Population 16 and Older)
Educational Attainment In Labor Force
Civilian Employed Unemployed Not in Labor Force
Less than high school graduate 905 139 802
High school graduate (includes
equivalency) 2,898 167 845
Some college or Associate's degree 4,104 303 868
Consolidated Plan DOVER 53
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 183
Educational Attainment In Labor Force
Civilian Employed Unemployed Not in Labor Force
Bachelor's degree or higher 3,479 150 667
Table 43 - Educational Attainment by Employment Status
Data Source: 2007-2011 ACS
Educational Attainment by Age
Age
18–24 yrs 25–34 yrs 35–44 yrs 45–65 yrs 65+ yrs
Less than 9th grade 63 63 54 146 569
9th to 12th grade, no diploma 449 389 550 670 525
High school graduate, GED, or
alternative 1,506 1,029 1,003 1,934 1,609
Some college, no degree 4,232 1,656 907 1,560 849
Associate's degree 191 341 541 574 233
Bachelor's degree 395 1,148 531 1,337 426
Graduate or professional degree 63 220 303 1,031 477
Table 44 - Educational Attainment by Age
Data Source: 2007-2011 ACS
Educational Attainment – Median Earnings in the Past 12 Months
Educational Attainment Median Earnings in the Past 12 Months
Less than high school graduate 18,009
High school graduate (includes equivalency) 27,151
Some college or Associate's degree 32,182
Bachelor's degree 46,018
Graduate or professional degree 62,079
Table 45 – Median Earnings in the Past 12 Months
Data Source: 2007-2011 ACS
Based on the Business Activity table above, what are the major employment sectors within
your jurisdiction?
Arts, Entertainment, Accommodations
Education & Health Care Services
Manufacturing
Retail Trade
Consolidated Plan DOVER 54
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 184
Describe the workforce and infrastructure needs of the business community:
Health Care, Education, Tourism and Hospitality are placing a growing demand on the
workforce. It is essential that the educational programs available provide a well-trained and
available workforce for these growing industries.
Describe any major changes that may have an economic impact, such as planned local or
regional public or private sector investments or initiatives that have affected or may affect
job and business growth opportunities during the planning period. Describe any needs for
workforce development, business support or infrastructure these changes may create.
Dover’s designation as a Downtown Development District has already led to increased interest
by developers in the City’s priority redevelopment target area. This designation will be in place
for ten years. The City of Dover is one of the partners in the Restoring Central Dover project
where NCALL is the lead agency/organization. The initiatives developed under the grant for this
project will have a direct impact on the areas surrounding Downtown Dover targeted for
commercial and residential redevelopment. The Garrison Oak Technology Park infrastructure
construction is slated for completion by summer 2015. The installation of roads, curbs, a water
tower to the already completed water, sewer, gas, electric and fiber optic services will make
this a very attractive location for businesses interested in relocating or expanding operations in
Dover.
How do the skills and education of the current workforce correspond to employment
opportunities in the jurisdiction?
Based on the training provided by our local high school and higher education institutions, the
current workforce has the skills and education needed to take advantage of current
employment opportunities.
Describe any current workforce training initiatives, including those supported by Workforce
Investment Boards, community colleges and other organizations. Describe how these efforts
will support the jurisdiction's Consolidated Plan.
Delaware State University, Wesley College, Wilmington University and Delaware Technical and
Community College offer on-going and specialized training opportunities through their
Workforce Development and Community Education programs designed to meet the technology
changes and needs of local employers. DTCC course offerings include computer training, health
care and “green training programs” from solar technology to automated building management.
Delaware State University In addition to offering computer and health care education
opportunities has a School of Business that offers undergraduate and graduate degrees in
business and economics. Wesley College has implemented and expanded health care training
Consolidated Plan DOVER 55
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 185
courses including the BSN and MSN degrees. Polytech High School offers a variety of adult
education courses and vocational training for high school students. These educational
institutions support the jurisdiction’s consolidated plan by providing a well trained workforce in
a variety of skill sets required by local employers
Does your jurisdiction participate in a Comprehensive Economic Development Strategy
(CEDS)? Yes.
If so, what economic development initiatives are you undertaking that may be coordinated
with the Consolidated Plan? If not, describe other local/regional plans or initiatives that
impact economic growth.
The current CEDS plan developed by the State of Delaware was submitted to the US Economic
Development Administration in February 2015. Although the City of Dover does not have a
project currently listed, projects may be added as the need arises. The previous CEDS
document listed the infrastructure improvements at the Garrison Oak Technology Park as the
state’s highest priority CEDS project.
Consolidated Plan DOVER 56
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 186
MA-50 Needs and Market Analysis Discussion
Are there areas where households with multiple housing problems are concentrated?
(include a definition of "concentration")
The Census Bureau defines an area of concentration as a neighborhood or development in
which more than 30% of the population has a common race, ethnicity or income. HUD defines
a low and moderate income area where at least 51% of the residents are low and moderate
income. Areas of concentration for low income households are significant because they often
experience multiple housing problems to a much greater degree than the population in general.
Are there any areas in the jurisdiction where racial or ethnic minorities or low-income
families are concentrated? (include a definition of "concentration")
The largest minority group in Dover is the African-American community. This community is
located in two major areas. The first area is the historically African American settlement area.
These areas were originally laid out and developed by African Americans, included in this
category are Lincoln Park, Northwest Dover Heights, The College Settlement on State College
Road and the western edges of Central Dover. The second area is dominated by the public
housing developments and subsidized private developments, which have attracted a large
number of minority residents. Included in this category are Capital Green, Whatcoat
Apartments, Simon Circle, and Manchester Square.
Consolidated Plan DOVER 57
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 187
In the City of Dover, HUD has designated those Census Block groups, which have greater than a
51% concentration of low-moderate income persons. The areas within City limits are limited to
Block Group 408-01, 413-01, 412-01 and 410-02. The map below identifies the concentration
of African Americans within the City of Dover.
What are the characteristics of the market in these areas/neighborhoods?
The majority of the homes located within the referenced census tracts are older single family
homes that were constructed before 1950 and from 1950-1979. In the Central Dover Target
Area, many of the residents face a considerable housing cost burden with 81% of renters in the
area paying more than 30% of their income towards rent. In addition, 75% of properties in this
area are occupied by renters with only a 25% homeownership rate.
Consolidated Plan DOVER 58
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 188
Are there any community assets in these areas/neighborhoods?
Yes. The City of Dover Downtown Business District is located in the Central Dover Target area
and within a short distance of low income block groups. Local and State government buildings
and the public library are also centrally located within these areas.
Are there other strategic opportunities in any of these areas?
As mentioned early, there are several revitalization projects underway that will preserve the
existing housing stock by rehabilitating older properties in the designated target areas,
increase homeownership by providing down payment and rehabilitation assistance to first time
homebuyers who purchase properties in the designated target areas, construct affordable
housing, provide transfer and real estate transfer tax relief, strengthen the Downtown
business community by waiving business licenses fees and offer façade improvement grants to
help business owners improve their storefronts, and receive up to 20% cash rebate for
qualifying construction projects.
Consolidated Plan DOVER 59
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 189
Strategic Plan
SP-05 Overview
Strategic Plan Overview
The Consolidated Plan and the Strategic Plan was prepared in compliance with federal
regulations requiring a Consolidated Plan to be completed every five years. An analysis of the
population information with priority needs and goals have been prepared to guide the City’s
Community Development Block Grant Program over the next five years.
The Strategic Plan will outline the goals and objectives to be completed over the next five years
that will service low to moderate income people in the City of Dover.
The following list the priority and community development needs identified for the next five
years:
Homeless Needs
Permanent Supportive Housing
Public Service Needs
Homeownership Assistance
Homeowner Rehabilitation
Public Facility Improvements
The following three (3) goals and objectives have been set for priorities based on guidelines
from HUD:
Goal 1: Provide Aid to special needs persons
Objective:
The City will support the homeless population to agencies that service the homeless by
providing CDBG funding to homeless shelters, support rapid rehousing/rental assistance for
those that are risk of homelessness, and support the Homeless Planning Council’s goal to end
Chronic Homelessness in Delaware.
Goal 2: Preserve the existing housing stock in the City of Dover
Objective:
The City will continue to rehabilitate owner occupied homes found in violation of the City’s
Housing Code and provide assistance for emergency repairs that will eliminate severe housing
conditions that constitute health and safety hazards.
Consolidated Plan DOVER 60
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 190
Goal 3: Encourage owner occupied housing in low to moderate income areas
Objective:
The City will provide down payment and settlement assistance to qualified families who
purchase properties in the City of Dover and designated revitalization target areas.
Consolidated Plan DOVER 61
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 191
SP-10 Geographic Priorities – 91.215 (a)(1)
Geographic Area
The City of Dover will allocate CDBG funding city-wide to projects that service persons that are
low and moderate income and in designated target areas where at least 51% of the residents
that will be serviced are low to moderate income.
Table 46 - Geographic Priority Areas
General Allocation Priorities
Describe the basis for allocating investments geographically within the jurisdiction (or within the EMSA
for HOPWA)
The City of Dover is a small entitlement community that only receives CDBG funding . The
majority of CDBG funding will have an impact on low to moderate income persons city-wide
that entails providing funding to homeless shelters for operating cost and maintenance cost,
and homeless providers that will provide temporary and permanent supportive housing to
those that are at risk of becoming homeless. The City will continue to provide funding to the
housing rehabilitation and emergency home repair programs that will service low to moderate
income person’s city wide. The City has focused on providing down payment assistance along
with other incentives the City is offering to qualifying families that purchase affordable housing
within the designated target area. In addition, the City will geographically coordinate CDBG
funding for renovations to existing vacant housing that will be sold to low income persons and
will preserve the existing housing stock in the City of Dover. The City has effectively
affirmatively furthered fair housing by creating a balance serving low to moderate income
persons in impacted and non-impacted areas throughout the City.
Consolidated Plan DOVER 62
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 192
SP-25 Priority Needs - 91.215(a)(2)
Priority Needs
Table 47 – Priority Needs Summary
1 Priority Need Homelessness
Name
Priority Level High
Population Extremely Low
Low
Chronic Homelessness Individuals
Mentally Ill
Victims of Domestic Violence
Families with Children
Unaccompanied Youth
Persons with HIV/AIDS
Veterans
Elderly
Frail Elderly
Geographic Citywide
Areas Affected
Associated Public Services
Goals Affordable Rental Housing
Description The City will provide funding to support homeless providers to emergency shelters
and for rental assistance/rapid rehousing for those at risk of becoming homeless.
The City has also accepted the challenge to End Veterans Homelessness by
December 2015.
Basis for Although the City of Dover has the lowest population of homelessness in the
Relative State of Delaware, there remains a high need to service this population in the City.
Priority There is a shortage of resources and available emergency shelters in Dover.
2 Priority Need Homeowner Rehabilitation
Name
Priority Level High
Consolidated Plan DOVER 63
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 193
Population Extremely low
Low
Moderate
Geographic Citywide
Areas Affected Designated Target Areas
Associated Homeowner Rehabilitation
Goals
Description To preserve the existing housing stock in the City by bringing housing found in
violation of the City’s Housing Code up to standard conditions.
Basis for Based on the Community Development Needs survey and meeting with focus
Relative groups, homeowner rehabilitation needs were determined to be a high priority in
Priority the City of Dover.
3 Priority Need Homeownership Assistance
Name
Priority Level High
Population Extremely Low
Low
Moderate
Geographic Citywide
Areas Affected Designated Target Areas
Associated Homeownership Assistance
Goals
Description Homeownership Assistance includes down payment and settlement assistance to
first-time homebuyers who purchase affordable housing in the City of Dover.
Basis for There is a high demand for affordable housing in the City of Dover, especially for
Relative low to moderate income persons
Priority
Narrative (Optional)
Consolidated Plan DOVER 64
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 194
SP-30 Influence of Market Conditions – 91.215 (b)
Influence of Market Conditions
Affordable Market Characteristics that will influence
Housing Type the use of funds available for housing type
Tenant Based The Dover Housing Authority administers the Section 8 Housing Choice Vouchers
Rental Assistance for rental assistance in Dover. Due to lack of affordable rental housing in Dover
(TBRA) and landlord’s unwillingness to rent to Section 8 tenants, it is very difficult to
obtain affordable housing. The City’s goals are to support developers who
construct affordable rental housing and to preserve the existing rental housing.
TBRA for Non- See the description above. The TBRA is intended to assist low income residents
Homeless Special who may not have special needs.
Needs
New Unit At the present time, there is more of a focus on existing housing rehabilitation
Production than new construction due to the cost of land, infrastructure improvements
required for development of land and construction and accessibility standards to
construct affordable housing
Rehabilitation The City will continue to provide funding for the Homeowner Rehabilitation
Program due to the high demand in the City, especially for older housing stock.
Homeowner rehab continues to be a top priority in determining community
development needs throughout the Consolidated Plan process every five years.
Acquisition, CDBG funds can be used as gap financing for down payment assistance to
including purchase affordable housing and also used to preserve existing housing acquired
preservation by housing providers and in need of renovations before selling to a low to
moderate income family.
Table 48 – Influence of Market Conditions
Consolidated Plan DOVER 65
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 195
SP-35 Anticipated Resources - 91.215(a)(4), 91.220(c)(1,2)
Introduction
The City of Dover receives the Community Development Block Grant (CDBG) from the United States Department of Housing and
Urban Development (HUD).
Since CDBG resources are very limited, the City coordinates projects with other city departments, State and Local Housing
Authorities and partners with non-profit and private organizations that have multiple resources that will aid in meeting the goals and
objectives of the Consolidated Plan.
Anticipated Resources
Program Source Uses of Funds Expected Amount Available Year 1 Expected Narrative Description
of Annual Program Prior Year Total: Amount
Funds Allocation: Income: Resources: $ Available
$ $ $ Reminder
of
ConPlan
$
CDBG federal Homeowner Rehab $220,717 $8,564 0 $229,271 $917,084 Expected amount includes a
Homebuyer reduction in grant funding over a
Assistance four year period.
Public Facility
Improvements
Rapid Re-housing
(rental assistance)
Public Services
Table 49 - Anticipated Resources
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how
matching requirements will be satisfied
There is not a match requirement for CDBG funds; however, sub-recipient agencies that were funded have additional resources to
Consolidated Plan DOVER 66
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 196
supplement their projects. In addition, there are several initiatives and investment projects in the City where CDBG funds will be
used as an additional resource to supplement funding these projects.
If appropriate, describe publically owned land or property located within the jurisdiction that may be used to address the needs
identified in the plan
Two lots owned by the City were sold to Habitat for Humanity below market rate to build affordable housing for very low income
families. In addition, Habitat has purchased additional lots and properties within the City in which new housing will be constructed
and existing housing renovated to provide affordable housing to very low income families.
Discussion
This section is optional and was left blank intentionally.
Consolidated Plan DOVER 67
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 197
SP-40 Institutional Delivery Structure – 91.215(k)
Explain the institutional structure through which the jurisdiction will carry out its consolidated plan
including private industry, non-profit organizations, and public institutions.
Responsible Entity Responsible Entity Role Geographic Area Served
Type
City of Dover Local Government Planning and City of Dover
Administration
Homeownership
Assistance Program
Dover Housing Public Housing Public Housing City of Dover
Authority Authority Rental Assistance
Tax Credits
Delaware State Housing State Housing Rental Statewide
Authority Authority Tax Credits
Homeownership
Assistance
Homelessness
Non-homelessness
Special Needs
Delaware Continuum of Continuum of Care Homelessness rapid Statewide
Care rehousing permanent
supportive housing
emergency housing
NCALL Research, Inc. Non-Profit Housing Counseling Statewide
Loan Financing
Housing Development
Financial Literacy
Foreclosure Prevention
Self-Help Housing
Milford Housing Non-Profit Housing Rehabilitation Kent and Sussex
Development Emergency Repairs Counties
Corporation Self Help Housing
Rental
Tax Credits Transitional
Housing
Dover Interfaith Mission Subrecipients Homelessness Rapid City of Dover
for Housing Rehousing Supportive Statewide
Connections Housing Substance
Community Support Abuse Treatment
Program Peoples Place Public Services
II
Table 50 - Institutional Delivery Structure
Assess of Strengths and Gaps in the Institutional Delivery System
Consolidated Plan DOVER 68
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 198
The City of Dover administers the Community Development Block Program (CDBG) and
provides funding to agencies that service the needs of the very low and low to moderate
income persons within the City of Dover. These services include providing aid to the homeless,
housing rehabilitation, homeownership assistance and housing counseling.
The main gap that exists in the Institutional Delivery System is the lack of affordable rental
housing. The public housing waiting list for Dover Housing Authority has 843 applicants and 635
applicants on the Section 8 waiting list. The average person remains on the waiting list for up to
4 years which increases the risk of homelessness and suffers from a severe housing cost burden
paying over 50% of their income in rent.
Availability of services targeted to homeless persons and persons with HIV and mainstream
services
Homelessness Prevention Available in the Targeted to Targeted to People
Services Community Homeless with HIV
Homelessness Prevention Services
Counseling/Advocacy X X X
Legal Assistance X
Mortgage Assistance X
Rental Assistance X X X
Utilities Assistance X X
Street Outreach Services
Law Enforcement X
Mobile Clinics X X
Other Street Outreach Services X X X
Supportive Services
Alcohol & Drug Abuse X X X
Child Care X
Education X
Employment and Employment X
Training
Healthcare X X
HIV/AIDS X
Life Skills X X
Mental Health Counseling X X
Transportation X
Other
Other
Table 51 - Homeless Prevention Services Summary
Consolidated Plan DOVER 69
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 199
Describe how the service delivery system including, but not limited to, the services listed
above meet the needs of homeless persons (particularly chronically homeless individuals and
families, families with children, veterans and their families, and unaccompanied youth)
Local and Statewide service providers provide mainstream services such as healthcare, mental
healthcare, substance abuse counseling, food assistance and job training to low income
population and those with special needs. The Delaware Continuum of Care also provides
mainstream services for homeless individuals that include rapid rehousing, permanent
supportive housing and emergency shelter.
Describe the strengths and gaps of the service delivery system for special needs population
and persons experiencing homelessness, including, but not limited to, the services listed
above
The strength of the service delivery system is the state service and housing providers. The gaps
in the delivery system include a lack of federal funding and affordable housing for persons that
have low and very low income in addition to the limited number of overnight shelter beds.
Provide a summary of the strategy for overcoming gaps in the institutional structure and
service delivery system for carrying out a strategy to address priority needs
The strategy for overcoming gaps in the institutional structure is to continue to provide CDBG
funding and support to the existing service and housing providers that service the needs of low
income persons and those with special needs. In addition, the City will continue to work
collaboratively with non-profits and the State and local housing authorities on initiatives that
support affordable housing in the City of Dover.
Consolidated Plan DOVER 70
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 200
SP-45 Goals Summary – 91.215(a)(4)
Goals Summary Information
Sort Goal Name Start End Category Geographic Needs Funding Goal Outcome
Order Year Year Area Addressed Indicator
1 HP-1 2015 2019 Homeless City-wide Homeless CDBG: Tenant Based Rental
Homeless/ Rapid Re- $37,391 Assistance/Rapid Re-
Rapid housing housing 15
Re-housing Provide motel households assisted
vouchers Provide Motel
vouchers: 50
households assisted
2 HP-2 2015 2019 Homeless City-wide Homeless CDBG: Provide shelter for
Homeless Prevention $135,000 800 homeless men
Prevention
3 AH-1 2015 2019 Affordable City-wide/ Homebuyer CDBG: Direct Financial
Affordable Housing Target Area Assistance $300,000 Assistance to
Housing Homebuyers: 15
households
assisted
4 AH-2 2015 2019 Affordable City-wide Housing Stock CDBG Homeowner
Affordable Housing Rehabilitation $450,000 Rehabilitation : 20
Housing Household units
Emergency Repairs:
50 Household units
assisted
5 AH-3 2015 2019 Affordable City-Wide/ Housing Stock CDBG Renovate one single
Affordable Housing Target Area Rehabilitation $240,000 family home
housing Emergency Repairs:
40 Household units
assisted
6 PF-4 Public 2015 2019 Affordable City-wide Public Facility CDBG Renovations to
Facility Housing Improvements $6,726 homeless shelter,
Improvements 710 persons served
Table 52 – Goals Summary
Consolidated Plan DOVER 71
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 201
Goal Descriptions
1 Goal Meet the needs of persons that are homeless or at risk of homelessness by providing rental assistance,
Description
to obtain affordable housing, and provide motel vouchers for temporary housing to prevent homelessness.
2 Goal Name Homeless Prevention
Goal Meet the needs of men that are homeless by providing shelter and assist in providing permanent
Description
pportive supportive housing.
3 Goal Name Affordable Housing/Homeownership Assistance
Goal Increase homeownership by providing down payment and closing cost to low income persons who
Description
purchase purchase affordable housing in the City.
4 Goal Name Affordable Housing /Preserve the Existing Housing Stock
Goal Rehab owner occupied housing that is in violation of the City’s Housing Code and complete emergency
Description
home rep repairs that will eliminate health and safety hazards in order to preserve the existing housing stock in
the City.
5 Goal Name Public Facilities and Improvements
Goal Renovations will be completed on public facilities that service low income persons.
Description
Estimate the number of extremely low-income, low-income, and moderate-income families to
whom the jurisdiction will provide affordable housing as defined by HOME 91.315(b)(2)
The City of Dover is not a recipient of HOME funds, however the City estimates that ii will
complete 25 homeowner rehabs within the City of Dover and provide homeownership
assistance to 20 first-time homebuyers who purchase affordable housing in the City.
Consolidated Plan DOVER 72
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 202
SP-50 Public Housing Accessibility and Involvement – 91.215(c)
Need to Increase the Number of Accessible Units (if Required by a Section 504 Voluntary
Compliance Agreement)
The Dover Housing Authority (DHA) waiting list for public housing as of 2014 indicated there are
21 accessible housing units in need. As part of their goals to complete for the Analysis of
Impediments, DHA has indicated they will apply the minimum set-aside for accessible units and
require assessable units in all housing projects.
Activities to Increase Resident Involvements
DHA provides their residents with support and assistance in job training, parenting, counseling,
financial management, and other skills. These programs are integrated in the housing programs
through the Family Self-Sufficiency Program and/or other resident initiatives. It is the position of
the City of Dover that these programs provide excellent opportunities for those in public housing
to become economically and socially self-sufficient. The following are additional programs that
involve resident involvement:
GED/ABE Literacy Classes
Employment Training for Adults and Youth
After School and Summer Programs for Youth
Life Skills and Soft Skills Training for Adults
Is the public housing agency designated as troubled under 24 CFR part 902?
No
Plan to remove the ‘troubled’ designation
N/A
Consolidated Plan DOVER 73
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 203
SP-55 Barriers to affordable housing – 91.215(h)
Barriers to Affordable Housing
At this time, it is the City of Dover’s contention that there are no significant barriers to
affordable housing which describes dwelling units whose total cost are deemed affordable to
those who have a median income. However, there are few constraints that may be an obstacle
in constructing affordable housing such as development impact fees which increases the cost to
develop new housing, land use policies outlined in the City’s Comprehensive Plan, and building
and zoning codes.
Unlike many communities, Dover has not practiced “exclusionary zoning” where most of the
undeveloped land is designated for large lot single family detached homes. To the contrary, The
Dover Plan (Dover’s Comprehensive Plan) designates a large portion of undeveloped lands for
medium density housing, and a smaller but significant portion for high density housing. The land
is subsequently zoned accordingly, permitting a range of residential densities and housing types.
The most recent 2008 Comprehensive Plan Update was adopted in February 2009 with
amendments in November 2009, March 2011, April 2011, March 2012, and March 2014. The
Land Development Plan specifically identifies a range of residential land uses from low density to
high density throughout the City. The plan continues to recommend a range of residential
densities and focuses specifically on housing in one chapter.
Strategy to Remove or Ameliorate the Barriers to Affordable Housing
The City of Dover is currently working on several revitalization and housing initiatives in
collaboration with other local housing providers that will assist in reducing the barriers to
affordable housing. The following is an outline of incentives and goals to promote affordable
housing in the City of Dove within the designated target areas:
Incentives
Provide up to 20% cash rebate for qualifying construction projects (capped at $1
million/property)
A transfer tax rebate of the buyer’s portion of the real estate tax upon issuance of a
Certificate of Occupancy
Waiver of building, plumbing, mechanical and fire protection permit fees
Waiver of City sewer and water impact fees
10 year abatement of property tax on the value of improvements
Up to $20,000 in down payment cost to purchase affordable housing
Consolidated Plan DOVER 74
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 204
Property tax abatement for first-time homebuyers who purchase property in the
Redevelopment Target Area that occupy the home as their principal residence for four
years
Goals
Encourage greater zoning flexibility to enable infill housing development in the
Downtown Redevelopment District by relaxing setback and block standard
requirements to allow condominiums and townhouse styles of housing.
Explore land banking and land trust options for assembling parcels and
redevelopment efforts.
Strengthen existing housing by expanding the Home Repair Programs
Consolidated Plan DOVER 75
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 205
SP-60 Homelessness Strategy – 91.215(d)
Reaching out to homeless persons (especially unsheltered persons) and assessing their
individual needs
The City of Dover will continue to support programs that service the homeless by providing
CDBG funding to agencies whose mission is to assist those that are homeless and unsheltered
through rapid rehousing, rental assistance and operating cost for emergency shelters.
Addressing the emergency and transitional housing needs of homeless persons
There are agencies within the City of Dover that provide both emergency shelter and transitional
housing. Code Purple was established in the fall of 2014 that provides shelter for homeless
persons in Kent County when the temperature or wind chill drops below 32 degrees. When
Code Purple is in effect, the homeless are guided to emergency shelters and participating
churches within the City of Dover and throughout Kent County that provide warm beds and hot
meals.
Helping homeless persons (especially chronically homeless individuals and families, families
with children, veterans and their families, and unaccompanied youth) make the transition to
permanent housing and independent living, including shortening the period of time that
individuals and families experience homelessness, facilitating access for homeless individuals
and families to affordable housing units, and preventing individuals and families who were
recently homeless from becoming homeless again.
Over the next five years, the City of Dover will provide CDBG funding to the Connections
Community Support Program that will provide rapid rehousing/rental assistance to support the
homeless population and those that are at risk of becoming homeless transition to permanent
supportive housing and independent living. In addition, the Delaware Continuum of Care (CoC)
provides supportive services as well as the State Division of Health and Social Services.
Help low-income individuals and families avoid becoming homeless, especially extremely low-
income individuals and families who are likely to become homeless after being discharged
from a publicly funded institution or system of care, or who are receiving assistance from
public and private agencies that address housing, health, social services, employment,
education or youth needs
The local and State housing providers will continue to provide support to the population
identified. In addition, the Individualized Assessment, Discharge, and Planning Team (IADAPT)
was established in 2010 to provide inmates with advocates that will assist them with
mainstream resources once they are discharged and reduce recidivism.
Consolidated Plan DOVER 76
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 206
SP-65 Lead based paint Hazards – 91.215(i)
Actions to address LBP hazards and increase access to housing without LBP hazards
Currently, the State of Delaware Department of Public Health enforces lead based paint
abatement within the City of Dover. Under the State's program, families with children who have
been diagnosed by the Public Health centers with lead poisoning are referred to a State Lead
Based Paint Inspector. The inspector then performs the relevant technical analysis of the
family’s residence. If lead based paint is discovered, abatement is required. The City of Dover
Department of Planning and Inspections acts in partnership with the State in assuring that lead
paint hazards are reduced or eliminated, and that affected housing units are brought up to code.
The City currently requires lead-based paint testing and interim controls in conjunction with its
CDBG rehabilitation program. The City of Dover Department of Planning and Inspections does
not have the equipment necessary to accurately identify lead-based paint during housing
inspections.
In addition to the activities of the City of Dover and the State of Delaware Department of Public
Health, the Dover Housing Authority has been active in lead based paint abatement in the City.
The Dover Housing Authority has tested and abated lead-based paint in all its public housing
units. The Dover Housing Authority also deals with the lead paint hazards in private rental units
through the enforcement of the Housing Quality Standards in conjunction with its Section 8
Rental Certificate/ Rental Voucher Program
How are the actions listed above related to the extent of lead poisoning and hazards?
The City of Dover provides information and training to staff who administer the Homeowner
Rehabilitation Program to ensure the proper procedures are administered and that residents are
properly educated on the dangers of lead based paint hazards.
How are the actions listed above integrated into housing policies and procedures?
For all rehabilitation projects that qualify for lead base paint testing and hazards, the City will
take the necessary actions in order to reduce lead base paint hazards in accordance with HUD
regulations and monitor the programs for compliance that carry out rehabilitation projects.
Consolidated Plan DOVER 77
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 207
SP-70 Anti-Poverty Strategy – 91.215(j)
Jurisdiction Goals, Programs and Policies for reducing the number of Poverty-Level Families
Based on 2009-2013 Census Data approximately 18.5% of Dover's population lived below the
poverty level. This percentage was somewhat higher than surrounding areas in Kent County
(which had 8.1% of the population below poverty level) and higher than the average for the
State of Delaware (11.7%). Clearly, there is a concentration of persons living below the poverty
level in Dover.
To address poverty within the City of Dover, a multi-faceted Anti-Poverty Strategy will be
described below. This strategy stresses partnership with and the support of other agencies and
organizations. Within the City of Dover there are two full service housing authorities, and
various social service agencies which need and deserve the City's support. In addition to these
service providers, the City of Dover will direct revitalization, economic development, and code
enforcement efforts at low to moderate income neighborhoods. This will provide quality places
for people in these neighborhoods to live and work, and provide them with new and better
opportunities to earn a living.
The following are the four main elements of the City of Dover's Anti-Poverty Strategy:
Highest Priority Given to Funding Proposals which Address or Fight Poverty: The City of
Dover’s PR&CE Committee will give the highest priority in the Five Year Plan to proposals
which are targeted towards those living in poverty. These proposals must be consistent
with one or more of the following Priorities identified in this plan:
o Encourage Affordable Owner Occupied Housing in Low to Moderate Income
Areas
o Improve Quality of Housing Stock
o Aid in Economic Opportunities in Low to Moderate Income Areas
Support Family Self-Sufficiency Programs and other Resident Initiatives/Counseling
Programs at Dover's Housing Authorities: Both the Delaware State Housing Authority
and the Dover Housing Authority provide their residents with support and assistance in
job training, parenting, counseling, financial management, and other skills. These
programs are integrated in the housing programs through the Family Self-Sufficiency
Program and/or other Resident Initiatives. It is the position of the City of Dover that
these programs provide excellent opportunities for those in public housing to become
economically and socially self-sufficient. The City of Dover will provide assistance and
support as requested to encourage the continuance of these programs.
Consolidated Plan DOVER 78
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 208
Support the Various Social Service Providers that serve Dover's poor: There is a network
of service providers presently operating in Dover that serve the City's poor. These
providers include The State of Delaware Division of Health and Social Services and the
State Service Centers. There are also numerous non-profit corporations within the City,
including the House of Pride and People’s Place and Dover Interfaith Mission to the
homeless. The City will support the missions and the functions of these organizations by
providing technical and planning support, and when possible implementing physical
improvements to infrastructure, which serves these facilities.
Economic Development: The only way to solve the problem of poverty is to help families
earn more money. To do so, there must be an abundant supply of jobs available to low
and moderate income persons. It is the strategy of the City to use multiple approaches
to job creation.
Through the Downtown Dover Partnership encourages the development and expansion
of businesses in the Downtown Area. A special focus should be firms, which provide jobs
for low to moderate-income persons. Job creation in the Downtown area will serve the
dual goals of maintaining and enhancing the older buildings in this historic area, and
providing employment in close proximity to a low to moderate income neighborhood.
The Central Delaware Chamber of Commerce encourages the development of new
business elsewhere in the Dover area. The attraction and retention of new corporations
and manufacturing firms to Dover will provide additional jobs for low to moderate-income
persons. One opportunity for new business location is the Garrison Oak Technology Park.
Consolidated Plan DOVER 79
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 209
How is the Jurisdiction poverty reducing goals, programs, and policies coordinated with this
affordable housing plan?
The City of Dover has an Economic Development department that does not utilize CDBG funds
for targeted projects within the City. The Economic Development Department has several
initiatives and incentives in place that will assist in reducing poverty in the City. The City will
continue to provide CDBG funds to address the needs of the low and moderate income persons
by focusing on homeownership assistance, homeowner rehabilitation, public service needs and
public facility improvements.
Consolidated Plan DOVER 80
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 210
SP-80 Monitoring – 91.230
Describe the standards and procedures that the jurisdiction will use to monitor activities
carried out in furtherance of the plan and will use to ensure long-term compliance with
requirements of the programs involved, including minority business outreach and the
comprehensive planning requirements
The City monitors CDBG activities on a consistent basis through client data, expense reports and
subrecipient activities, and annually through Monitoring Site Visits to determine if the
subrecipient is in compliance with HUD regulations and program agreements. The monitoring
process includes identifying any areas of non-compliance in carrying out program activities and
provides corrective actions to the sub-recipient to become compliant with the program
guidelines. CDBG administrative staff will continue to provide technical assistance to
subrecipeints and monitor financial compliance to ensure program funds are expended in a
timely manner.
Consolidated Plan DOVER 81
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 211
Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
The City of Dover receives the Community Development Block Grant (CDBG) from the United States Department of Housing and
Urban Development (HUD).
Since CDBG resources are very limited, the City coordinates projects with other city departments, State and Local Housing
Authorities and partners with non-profit and private organizations that have multiple resources that will aid in meeting the goals and
objectives of the Consolidated Plan.
Consolidated Plan DOVER 82
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 212
Anticipated Resources
Program Source Uses of Funds Expected Amount Available Year 1 Expected Narrative Description
of Funds Annual Program Prior Year Total: Amount
Allocation: Income: Resources: $ Available
$ $ $ Reminder
of
ConPlan
$
CDBG federal Acquisition $220,717 $8,564 0 $229,271 $917,084 Expected amount includes a
Admin Homeowner reduction in grant funding over a
Rehab four year period.
Homebuyer
Assistance
Public Facility
Improvements
Rapid Re-housing
(rental assistance)
Public Services
Table 53 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how
matching requirements will be satisfied
There is not a match requirement for CDBG funds; however, sub-recipient agencies that were funded have additional resources to
supplement their projects. In addition, there are several initiatives and investment projects in the City where CDBG funds will be
used as an additional resource to supplement funding these projects.
Consolidated Plan DOVER 83
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 213
If appropriate, describe publically owned land or property located within the jurisdiction that
may be used to address the needs identified in the plan
Two lots owned by the City were sold to Habitat for Humanity below market rate to build
affordable housing for very low income families. In addition, Habitat has purchased additional
lots and properties within the City in which new housing will be constructed and existing
housing renovated to provide affordable housing to very low income families.
Discussion
This section is optional and was left blank intentionally.
Consolidated Plan DOVER 84
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 215
Goal Descriptions
Goal Name Homeless /Rapid Re-Housing
1 Goal Meet the needs of persons that are homeless or at risk of homelessness by providing rental assistance to obtain affordable housing and provide
Description
motel vo motel vouchers for temporary housing to prevent homelessness.
2 Goal Name Homeless Prevention
Goal Meet the needs of men that are homeless by providing shelter and assist in providing permanent supportive housing.
Description
3 Goal Name Affordable Housing/Homeownership Assistance
Goal Increase homeownership by providing down payment and closing cost to low income persons who purchase affordable housing in the City.
Description
4 Goal Name Affordable Housing /Preserve the Existing Housing Stock
Goal Rehab owner occupied housing that is in violation of the City’s Housing Code and complete emergency home repairs that will eliminate health
Description
and safet and safety hazards in order to preserve the existing housing stock in the City.
5 Goal Name Public Facilities and Improvements
Goal Renovations will be completed on public facilities that service low income persons.
Description
Consolidated Plan DOVER 86
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 216
Projects
AP-35 Projects – 91.220(d)
Introduction
The 2015 Action Plan is a supplementary document to the Five Year Consolidated Plan (2015-
2019). The goals and objectives focus on developing and sustaining viable communities and
improving low and moderate income persons are addressed in the Consolidated Plan as part of
the strategy for addressing the needs of low and moderate income people.
Projects
# Project Name
1 Dover Interfaith Mission for Housing
2 Connections Community Support Program
3 Homeownership Assistance Program
4 Milford Housing Homeowner Rehabilitation Program
5 Milford Housing Emergency Home Repair Program
6 Central Delaware Habitat for Humanity
7 Peoples Place Emergency Homeless Shelter
Table 55 – Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved
needs
The projects that were selected were based on the highest ranking priorities that were
determined from public hearings and a Housing and Community Development Online Survey
identified by residents, local government officials and housing providers. The obstacle in
addressing the underserved need is the lack of adequate funding to continue to address these
needs.
Consolidated Plan DOVER 87
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 217
AP-38 Project Summary
Project Summary Information
1 Project Name Dover Interfaith Mission for Housing
Target Area City-Wide
Goals Supported Public Services
Needs Addressed Homelessness Operating Cost
Funding $27,000
CDBG funds will be utilized for operating cost for the shelter that
Description will include utilities, maintenance and lease cost.
Target Date 6/30/2016
Estimate the number and type of families that will
benefit from the proposed activities 170 men annually
2 Name Project Connections Community Support Program
Target Area City-Wide
Goals Supported Public Services
Needs Addressed Homeless Prevention Affordable Housing
Funding $7,391
CDBG funds will be used to provide rapid re-housing/rental
Description assistance services for homeless households within the city.
Target Date 6/30/16
Estimate the number and type of families that will
benefit from the proposed activities 10
Consolidated Plan DOVER 88
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 218
3 Project Name Homeownership Assistance Program
Target Area Downtown Development District Target Area/ City-Wide
Affordable Housing/ Encourage Owner-Occupied Housing in low
Goals Supported income areas
Needs Addressed Housing and Community Development
Funding $60,000
CDBG funds will be used to provide homeownership assistance to
first-time homebuyers who purchase affordable housing in the
Description Downtown Development District Target Area.
Target Date 6/30/16
Estimate the number and type of families that will
benefit from the proposed activities 4-6 families
4 Name Project Milford Housing Homeowner Rehabilitation Program
Target Area City-Wide
Goals Supported Affordable Housing/ Preserving the Existing Housing Stock
Needs Addressed Housing and Community Development
Funding $52,892
CDBG funds will be used to rehabilitate existing owner occupied
Description housing in the City that is in violation of the City’s Housing Code.
Target Date 6/30/16
Estimate the number and type of families that will
benefit from the proposed activities 4-5 families
5 Project Name Milford Housing Emergency Repair Project
Target Area City-Wide
Goals Supported Affordable Housing / Preserving Existing Housing Stock
Needs Addressed Housing and Community Development
Consolidated Plan DOVER 89
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 219
Funding $35,262
CDBG funds will be used to provide emergency home repairs to
owner occupied homes to eliminate housing conditions that
Description threaten the health and safety of low income homeowners.
Target Date 6/30/16
Estimate the number and type of families that will
benefit from the proposed activities 15
6 Project Name Central Delaware Habitat for Humanity
Target Area City-Wide
Goals Supported Affordable Housing/ Preserving Existing Housing Stock
Needs Addressed Housing and Community Development
Funding $40,000
CDBG funds will be used to rehabilitate and existing home
acquired by Habitat to sale to a family that is 60% below the Area
Description Median Income.
Target Date 6/30/16
Estimate the number and type of families that will
benefit from the proposed activities 1 family
7 Project Name Peoples Place Whatcoat Homeless Shelter
Target Area City- Wide
Goals Supported Public Facility Improvements
Needs Addressed Housing and Community Development
Funding $6,726
CDBG funds will be utilized for minor renovations to a facility that
Description shelters the homeless.
Consolidated Plan DOVER 90
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 220
Target Date 6/30/16
Estimate the number and type of families that will
benefit from the proposed activity 710 annually
Consolidated Plan DOVER 91
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 221
AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where
assistance will be directed
Geographic Distribution
Target Area Percentage of Funds
Downtown Target Area 27%
Table 56 - Geographic Distribution
Rationale for the priorities for allocating investments geographically
The purpose of the target block approach is to concentrate resources available to the public, private, and non-profit sectors for
housing programs in a specific area (known as the Target Area). The Target Area consists of one of Dover’s oldest working class
neighborhoods located in west central Downtown. This concentrated approach is to insure the likelihood of an immediate visual
impact and long-term stabilizing effect of each area. A map of the Target Area is attached.
The major element of the Target Block Program will be concentrated home-to-home internal inspection to determining deficiencies
which need to be corrected. Substandard housing requiring plumbing, electrical update to meet the Dover Building Code, but which
is basically sound and suitable for rehabilitation has been targeted. A sufficient number of low and moderate income families must
reside in the area.
The City has allocated all of its CDBG homeownership assistance for FY15 to first-time homebuyers who purchase affordable housing
in the target area which will coincide with the other incentives the City is offering through the Downtown Development District
Program. The percentage of funds utilized in the Target Area could possibly increase based on homeowner rehabilitation needs in
the Target Area.
The City will continue to affirmatively further fair housing by maintaining a balance of providing CDBG assistance in impacted and
non-impacted areas of the City.
Consolidated Plan DOVER 92
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 222
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
Housing is needed for all income levels but there is a greater need for affordable housing for low and very low income persons in the
City of Dover.
Over the past 11 years, the rental rates in Dover have increased over 49% and most likely will continue to rise over time with a
decrease in affordable rental housing units. The median home value had an even higher increase by 80% from 2000 to 2011. With
home values expected to rise over time, affordable housing will become an issue if production of affordable housing is not
constructed over time.
The Fair Market Rent for a 2 bedroom rental unit is higher than the most recent median contract rent by $206. This presents an issue
for persons that do not live in subsidized housing that are low income and paying over 50% of their income on housing. With the lack
of affordable rental housing, it will also be difficult for persons with Housing Choice Vouchers to find suitable housing.
The City of Dover is collaborating with other local housing providers on several initiatives to provide affordable housing in low to
moderate income target areas as well as city-wide by providing homeownership assistance to first time home buyers who purchase
properties within the City of Dover and designated target areas, provide real estate tax relief over a 4 year period for persons that
purchase properties within the designated target area, receive a transfer tax rebate for properties upon issuance of a Certificate of
Occupancy for properties purchased after March 1,2015 within the designated target area, and partnering with non-profits that will
be constructing affordable housing for low income persons over the next few years.
One Year Goals for the Number of Households to be Supported
Homeless 190
Non-Homeless 0
Special-Needs 0
Total 190
Table 57 - One Year Goals for Affordable Housing by Support Requirement
Consolidated Plan DOVER 93
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 223
One Year Goals for the Number of Households Supported Through
Rental Assistance 5
The Production of New Units 0
Rehab of Existing Units 15
Acquisition of Existing Units 0
Total 20
Table 58 - One Year Goals for Affordable Housing by Support Type
Discussion
Consolidated Plan DOVER 94
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 224
AP-60 Public Housing – 91.220(h)
Introduction
Dover Housing Authority (DHA) is the local Housing Authority that serves the City of Dover. DHA has a total of 374 public housing
units available for occupancy including 31 scattered site units. The majority of these units are 3 bedrooms. DHA also provides rental
assistance to low and moderate income persons through HUD’s Section 8 Program. Presently there are 174 housing choice vouchers
under lease and tenant based which means they are only offered to tenants on DHA’s waiting list.
Actions planned during the next year to address the needs to public housing
DHA conducts an annual and a 5-year Physical Needs Assessment of their public housing inventory to determine the public housing
needs. Projects are prioritized by the greatest need and completed with funding from their Capital Fund Program and their
Operating Subsidy funds.
Actions to encourage public housing residents to become more involved in management and participate in homeownership
Dover Housing Authority provides their residents with support and assistance in job training, parenting, counseling, financial
management and other skills. These programs are integrated in the housing programs through the Family Self-Sufficiency Program
and/or other Resident Initiatives. It is the position of the City of Dover that these programs provide excellent opportunities for those
in public housing to become economically and socially self-sufficient. DHA also provides homeownership opportunities through their
Section 8 program, where the resident applies 30% of their income towards their mortgage for the first fifteen years of owning their
home and DHA pays the remaining 70%. After fifteen years, the resident pays 100% of their mortgage.
If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance
Not applicable
Consolidated Plan DOVER 95
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 225
AP-65 Homeless and Other Special Needs Activities – 91.220(i)
Introduction
The City of Dover fully supports the Homeless Planning Council of Delaware challenge to End Chronic Homelessness. The City will
continue to provide CDBG funding to agencies and organizations that service the homeless and those with special needs.
Describe the jurisdictions one-year goals and actions for reducing and ending homelessness including
Reaching out to homeless persons (especially unsheltered persons) and assessing their individual needs
The City has provided CDBG funding to Connections Community Support Program to provide rapid rehousing/ rental assistance for
up to three (3) homeless households within the City of Dover. The City also accepted the Mayor’s Challenge to End Veterans
Homelessness in Dover by December 2015. The first goal is to house 22 veterans by June 2015 which has been accomplished by the
working groups of this initiative.
Addressing the emergency shelter and transitional housing needs of homeless persons
The City has provided CDBG funding to two local emergency shelters for operating and renovation cost that will assist in maintaining
safe, decent and affordable housing. Code Purple was established in the fall of 2014 that provides shelter for homeless persons in
Kent County when the temperature or wind chill drops below 32 degrees. When Code Purple is in effect, the homeless are guided to
emergency shelters and participating churches within the City of Dover and throughout Kent County that provide warm beds
Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their
families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the
period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to
affordable housing units, and preventing individuals and families who were recently homeless from becoming homeless again
Over the next five years, the City of Dover will provide CDBG funding to the Connections Community Support Program that will
provide rapid rehousing/rental assistance to support the homeless population and those that are at risk of becoming homeless
transition to permanent supportive housing and independent living. In addition, the Delaware Continuum of Care (CoC) provides
supportive services as well as the State Division of Health and Social Services.
Consolidated Plan DOVER 96
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 226
Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families
and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental
health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from
public or private agencies that address housing, health, social services, employment, education, or youth needs
The local and State housing providers will continue to provide support to the population identified. In addition, the Individualized
Assessment, Discharge, and Planning Team (IADAPT) was established in 2010 to provide inmates with advocates that will assist them
with mainstream resources once they are discharged and reduce recidivism.
Consolidated Plan DOVER 97
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 227
AP-75 Barriers to affordable housing – 91.220(j)
Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such
as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and
policies affecting the return on residential investment
At this time, it is the City of Dover’s contention that there are no significant barriers to affordable housing which describes dwelling
units whose total cost are deemed affordable to those who have a median income. However, there are few constraints that may be
an obstacle in constructing affordable housing such as development impact fees which increases the cost to develop new housing,
land use policies outlined in the City’s Comprehensive Plan, and building and zoning codes.
Unlike many communities, Dover has not practiced “exclusionary zoning” where most of the undeveloped land is designated for
large lot single family detached homes. To the contrary, The Dover Plan (Dover’s Comprehensive Plan) designates a large portion of
undeveloped lands for medium density housing, and a smaller but significant portion for high density housing. The land is
subsequently zoned accordingly, permitting a range of residential densities and housing types. The most recent 2008
Comprehensive Plan Update was adopted in February 2009 with amendments in November 2009, March 2011, April 2011, March
2012, and March 2014. The Land Development Plan specifically identifies a range of residential land uses from low density to high
density throughout the City. The plan continues to recommend a range of residential densities and focuses specifically on housing in
one chapter.
Consolidated Plan DOVER 98
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 228
AP-85 Other Actions – 91.220(k)
Actions planned to address obstacles to meeting underserved needs
The greatest obstacle in meeting the undeserved needs for the City are lack of federal, state and other sources of funding and the
lack of affordable housing. In addition, the City’s Downtown Target Area has the highest concentration of low to moderate income
residents with aging homes in need of housing rehabilitation with only a 25% homeownership rate in this area.
The following is an outline of incentives to promote affordable housing in the City of Dover within the designated target areas:
Incentives
Provide up to 20% cash rebate for qualifying construction projects (capped at $1 million/property)
A transfer tax rebate of the buyer’s portion of the real estate tax upon issuance of a Certificate of Occupancy
Waiver of building, plumbing, mechanical and fire protection permit fees
Waiver of City sewer and water impact fees
10 year abatement of property tax on the value of improvements
Up to $20,000 in down payment cost to purchase affordable housing
Actions planned to foster and maintain affordable housing
The following are goals that the City will focus on to foster and maintain affordable housing:
Encourage greater zoning flexibility to enable infill housing development in the Downtown Redevelopment District by
relaxing setback and block standard requirements to allow condominiums and townhouse styles of housing.
Explore land banking and land trust options for assembling parcels and redevelopment efforts.
Strengthen existing housing by expanding the Home Repair Programs
Consolidated Plan DOVER 99
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 229
Actions planned to reduce lead-based paint hazards
Currently, the State of Delaware Department of Public Health enforces lead based paint abatement within the City of Dover. Under
the State's program, families with children who have been diagnosed by the Public Health centers with lead poisoning are referred
to a State Lead Based Paint Inspector. The inspector then performs the relevant technical analysis of the family’s residence. If lead
based paint is discovered, abatement is required. The City of Dover Department of Planning and Inspections acts in partnership with
the State in assuring that lead paint hazards are reduced or eliminated, and that affected housing units are brought up to code.
The City currently requires lead-based paint testing and interim controls in conjunction with its CDBG rehabilitation program. The
City of Dover Department of Planning and Inspections does not have the equipment necessary to accurately identify lead-based
paint during housing inspections.
In addition to the activities of the City of Dover and the State of Delaware Department of Public Health, the Dover Housing Authority
has been active in lead based paint abatement in the City. The Dover Housing Authority has tested and abated lead-based paint in
all its public housing units. The Dover Housing Authority also deals with the lead paint hazards in private rental units through the
enforcement of the Housing Quality Standards in conjunction with its Section 8 Rental Certificate/ Rental Voucher Program
The City of Dover provides information and training to staff who administer the Homeowner Rehabilitation Program to ensure the
proper procedures are administered and that residents are properly educated on the dangers of lead based paint hazards.
For all rehabilitation projects that qualify for lead base paint testing and hazards, the City will take the necessary actions in order to
reduce lead base paint hazards in accordance with HUD regulations and monitor the programs for compliance that carry out
rehabilitation projects.
Actions planned to reduce the number of poverty-level families
The City of Dover will provide CDBG funding over the next five years to projects that will reduce the number of poverty level families
by addressing the most critical needs of families, such as providing rapid rehousing and rental assistance to the homeless, providing
funding and support to emergency shelters, providing homeownership assistance to qualifying families who purchase affordable
housing in the City of Dover, and complete homeowner rehabilitation and emergency homes repairs to owner occupied homes of
Consolidated Plan DOVER 100
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 230
low and very low income families in the City.
Actions planned to develop institutional structure
The main gap that exists in the Institutional Delivery System is the lack of affordable rental housing. The public housing waiting list
for Dover Housing Authority has 843 applicants and 635 applicants on the Section 8 waiting list. The average person remains on the
waiting list for up to 4 years which increases the risk of homelessness and suffers from a severe housing cost burden paying over
50% of their income in rent.
The strategy for overcoming gaps in the institutional structure is to continue to provide CDBG funding and support to the existing
service and housing providers that service the needs of low income persons and those with special needs. In addition, the City will
continue to work collaboratively with non-profits and the State and local housing authorities on initiatives that support affordable
housing in the City of Dover.
Actions planned to enhance coordination between public and private housing and social service agencies
The City will continue to collaborate with public and private housing providers and social service agencies to meet the goals and
objectives of the Consolidated Plan. The Community Development Administrator is a representative on several boards and
commissions throughout the State that service the needs of low to moderate income persons.
Consolidated Plan DOVER 101
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 231
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies
program income that is available for use that is included in projects to be carried out.
1. The total amount of program income that will have been received before 8,554
the start of the next program year and that has not yet been reprogrammed
2. The amount of proceeds from section 108 loan guarantees that will be 0
used during the year to address the priority needs and specific objectives
identified in the grantee's strategic plan
3. The amount of surplus funds from urban renewal settlements 0
4. The amount of any grant funds returned to the line of credit for which the 0
planned use has not been included in a prior statement or plan.
5. The amount of income from float-funded activities 0
Total Program Income 8,554
Other CDBG Requirements
1. The amount of urgent need activities 0
2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate 80.00%
income. Overall Benefit- A consecutive period of one, two or three years may be used to determine that a minimum
overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered
that include this Annual Action Plan.
Consolidated Plan DOVER 102
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 232
Appendix - Alternate/Local Data Sources
1 Data Source Name
US Census Data
List the name of the organization or individual who originated the data set.
Interface Studio
Provide a brief summary of the data set.
The consultants conducted a door to door survey to all residents within the revitalization area. The survey gathered data on the
housing and community development needs of the neighborhood, as well as basic demographic information.
What was the purpose for developing this data set?
This data was developed to determine the needs for the Central Dover Revitalization Initiative.
How comprehensive is the coverage of this administrative data? Is data collection concentrated in one geographic area or among a certain population?
Concentrated in one geographical area.
What time period (provide the year, and optionally month, or month and day) is covered by this data set?
April 2014
What is the status of the data set (complete, in progress, or planned)?
completed
Consolidated Plan DOVER 103
OMB Control No: 2506-0117 (exp. 07/31/2015)
Page 233
City of Dover
MAYOR AND COUNCIL
1 DRAFT PROPOSED COUNCIL RESOLUTION NO. 2015-08
2
3 A RESOLUTION PROPOSING APPROVAL OF THE 2015-2019 COMMUNITY DEVELOPMENT BLOCK
4 GRANT CONSOLIDATED PLAN.
5 RESOLUTION
6
7 WHEREAS, the City of Dover is entitled to $220,717 through the United States Department of Housing
8 and Urban Development Community Development Block Grant program; and
9
10 WHEREAS, the City of Dover has prepared the 2015-2019 Consolidated Plan, in accordance with the
11 United States Department of Housing and Urban Development guidelines, that serve as the primary
12 planning document for identifying and meeting the housing and community development needs for the
13 low and moderate-income residents of Dover; and
14
15 WHEREAS, the City of Dover is in favor of utilizing the Community Development Block Grant funds
16 for the community development purposes in accordance with the National Community Development
17 objectives of benefiting low and moderate income families, eliminating slums and blight, and meeting
18 other community development objectives; and
19
20 WHEREAS, the United State Department of Housing and Urban Development requires the City of
21 Dover to submit a Consolidated Plan and an Action Plan for Application for Federal Assistance
22 including the proposed use of funds and including certain certifications and policies to obtain its
23 $220,717 entitlement; and use of $8,554 in program income for eligible activities; and
24
25 NOW, THEREFORE BE IT RESOLVED THAT THE MAYOR AND COUNCIL OF THE CITY OF
26 DOVER APPROVE THE 2015-2019 Community Development Block Grant Consolidated Plan and
27 application for Federal Assistance included in the Consolidated Plan, along with certifications and
28 policies attached and authorize its forwarding to the United States Department of Housing and Urban
29 Development for consideration.
30
31 ADOPTED: *
MAYOR COUNCIL PRESIDENT
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 258
City of Dover
MAYOR AND COUNCIL
COUNCIL RESOLUTION NO. 2015-09
A RESOLUTION AUTHORIZING SIGNATURES FOR BANKING SERVICES ON BEHALF OF
THE CITY OF DOVER, DELAWARE
1 WHEREAS, the City of Dover's investment policy includes the investment of funds up to $100,000 per
2 banking institution, investments in the State of Delaware Investment Pool, and the purchase and sale of
3 investment grade corporate bonds, and U.S. Treasury and agency securities; and
4 WHEREAS, the banking institutions, brokerage firms, trust companies, and other various financial
5 institutions require an Authorizing Resolution for the opening of accounts, and for purchasing, selling,
6 transferring, assigning, and handling securities;
7 NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the City of Dover, that the
8 Controller/Treasurer, Assistant Controller/Treasurer, and Assistant Treasurers are hereby authorized to open
9 accounts with banking institutions and purchase, sell, transfer, assign, and handle securities and that they
10 are authorized to sign all related forms;
11 BE IT FURTHER RESOLVED that the transactions in these accounts be carried out with any one
12 signature; and
13 That the following are the office holders authorized for these purposes, until further notice:
14 Donna S. Mitchell - Controller/Treasurer
15 Lori Peddicord - Assistant Controller/Treasurer
16 Traci A. McDowell - Assistant Treasurer
17 Denise L. Devine - Assistant Treasurer
18 ADOPTED: *
19 S:\RESOLUTIONS-PROCLAMATIONS-TRIBUTES\2015\DRAFT\Resolution No. 2015-09 - Authorizing Controller-Treasurer, Assistant Controller-Treasurer, Assistant Treasurer to Disburse Funds-DRAFT.wpd
20
21 MAYOR COUNCIL PRESIDENT
22 Actions History:
23 May 11, 2015 - Scheduled for Introduction at City Council
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 259
FIRST READING
CITY OF DOVER PROPOSED ORDINANCE #2015-07
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL
2 MET:
3 That Chapter 46 - Fire Prevention and Protection, Article IV - Public Occupancies, Section 46-162 -
4 Sprinkler Requirements of the Dover Code be amended by inserting the bold, blue text, as follows:
5 Sec. 46-162. - Sprinkler requirements.
6 (a) Places of assembly shall be sprinklered throughout in accordance with the most recently adopted
7 edition of NFPA 13 when the following apply:
8 (1) All new indoor places of assembly with an occupant load of 150 persons or greater.
9 (2) Any interior renovations of 50 percent or more to an existing place of assembly with an occupant
10 load greater than 150 persons.
11 (3) Any additions or increase in interior size to an existing place of assembly that would create an
12 occupant load of 150 persons or greater.
13 (b) Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
14 throughout in accordance with the most recently adopted edition of NFPA 13 when the following
15 apply:
16 (1) All new indoor places of assembly with an occupant load of 100 persons or greater and where
17 alcohol will be served for consumption on the premises.
18 (2) Any interior renovation of 50 percent or more to an existing place of assembly with an occupant
19 load greater than 100 persons and where alcohol will be served for consumption on the premises.
20 (3) Any additions or increase in interior size to an existing place of assembly which would create
21 an occupant load of 100 persons or greater and where alcohol will be served for consumption on
22 the premises.
23 (c) New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in
24 accordance with the most recently adopted edition of NFPA 13.
25 (d) Three feet of unobstructed clear width shall be designed, designated, and maintained around
26 sprinkler risers for access by firefighters and for maintenance. The three feet shall be measured from
27 the outermost components of the sprinkler riser and all related support equipment.
28 (e) Fire Department Connections. Unless otherwise approved by the Fire Marshal, Fire
29 Department Connections shall be on the street side of the building and shall be located and
30 arranged so that hose lines can be readily and conveniently attached to without interference
31 from any nearby obstructions as defined by the Fire Marshal's Office. Fire Department
32 Connections shall be a 5 (five) inch Storz. Fire Department Connections shall be within 300
33 feet of an approved City of Dover Fire Hydrant and within 50 feet of the main entrance of the
34 structure it serves. All Fire Department Connections shall be not less than three feet nor more
35 than five feet in height above finished grade. The Fire Marshal shall have the authority to
36 require more stringent requirements when deemed necessary.
Page 260
Proposed Ordinance #2015-07 - Chapter 46 - Fire Prevention and Protection Page 2
37 BE IT FURTHER ORDAINED THAT Chapter 46 - Fire Prevention and Protection, Article IV - Public
38 Occupancies, Section 46-171 - Fire Alarm in Place of Assembly of the Dover Code be amended by inserting
39 the bold, blue text, as follows:
40 Sec. 46-171. - Fire alarm in place of assembly.
41 (a) Definition. For the purpose of this article, the requirements set forth in section A.4.1.2 of the most
42 currently published edition of the NFPA Life Safety Code shall be used to determine if an occupancy
43 is a place of assembly.
44 (b) Occupant load. For the purpose of this article, the requirements set forth in the most currently
45 adopted edition of the NFPA Life Safety Code shall be used to determine the occupant load of a
46 place of assembly.
47 (c) Fire alarm required. Any new occupancy or new portion of an occupancy determined to be a place
48 of assembly by the fire marshal, and is capable of receiving an occupant load of 75 persons or
49 greater, shall be required to install a fire alarm in accordance with NFPA codes governing the
50 installation of fire alarms and the National Electrical Code.
51 (d) Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined
52 to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent
53 of the assessed value of the building and is capable of receiving an occupant load 75 persons or
54 greater or is being enlarged to receive an occupant load of 75 persons or greater, shall be required
55 to install a complete fire alarm system in accordance with NFPA codes governing the installation
56 of fire alarms and the National Electrical Code.
57 (e) Public Mode Audible Requirements. To ensure that audible public mode signals are clearly
58 heard by occupants of a structure, they shall have a sound level at least 15 decibels (dB) above
59 the average ambient sound level or 5 decibels (dB) above the maximum sound level having a
60 duration of at least 60 seconds, whichever is greater, measured 5 feet (1.5m) above the floor
61 in the area required to be served by the system using the A-weighted scale dBA. In the event
62 the stated requirement cannot be met a Shunt Trip Relay/Switches shall be the approved
63 method of meeting the intent of this section of the code.
64 ADOPTED: *
65 S:\ORDINANCES\2015\DRAFT\Ordinance #2015-07 - Ch 46 - Fire Prevention and Protection-First Reading.wpd
66 SYNOPSIS
67 The amendments would allow the Fire Marshal’s Office to strategically locate fire department connections
68 for fire department use in the event of an emergency within a sprinklered building, in accordance with
69 NFPA 13 and Delaware State Fire Prevention Regulations. The amendments also relate to shunt trip
70 relays/switches that shut down amplified sounds (example; music) in the event of a Fire Alarm System
71 activation so that the public can exit the building without delay in the event of an emergency, in accordance
72 with NFPA 72 National Fire Alarm Code.
73 (SPONSORS: HUTCHISON AND MULLANEY)
74 Actions History
75 05/11/2015 - Scheduled for First Reading at City Council
76 04/27/2015 - Introduced at Safety Advisory and Transportation Committee