Page 1
PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE
The Parks, Recreation, and Community Enhancement Committee Meeting was held on
October 13, 2014, at 3:30 p.m. with Chairman Dixon presiding. Members present were
Mr. Hutchison, Mr. Anderson (arrived at 3:45 p.m.), Mr. Caldwell, and Mrs. Horsey.
Mayor Christiansen was also present.
AGENDA ADDITIONS/DELETIONS
Chairman Dixon requested that item #3, Update - Recreation Needs Assessment, be moved to be
considered as item #1, with items #1 and #2 becoming items #2 and #3 respectively.
Mr. Hutchison moved for approval of the agenda, as amended, seconded by Mrs. Horsey and
unanimously carried.
Update - Recreation Needs Assessment
Mrs. Ann Marie Townshend, Director of Planning and Community Development, provided members
with the displays that were utilized during the public workshops. She advised members that three
(3) public workshops were held for the Recreation Needs Assessment and that, although no one
attended the first two (2) workshops, the third workshop was well attended.
Mrs. Townshend reviewed the map on display that depicted the walk and bicycle zones in the larger
parks and noted that the majority of the residential areas in the City of Dover, there are recreational
resources situated in close proximity to residents. She reminded members that a survey was
conducted and that to date, there have been 429 responses. She stated that Wednesday,
October 15, 2014, is the last day the survey will be available for the public at which time, staff will
gather the data from the survey and then develop recommendations based on that data.
Mrs. Townshend stated it is her hope to have a solid draft in December to be presented to the
Committee and that additional workshops be held in early January to allow for public feedback and
then in February/March a final recommendation be presented for adoption.
Mrs. Townshend relayed appreciation for the work provided by Ms. Carolyn Courtney, noting that
she has been responsible for much of the work involved with his project, including all public
relations, completion of survey, etc.
Responding to Mr. Hutchison, Mrs. Townshend stated that the survey data will be combed through
to determine those responses submitted by City of Dover residents and those who reside outside of
the City limits. Mr. Hutchison requested that Staff provide a comprehensive breakdown of all
recreation provided to include what is provided by the State of Delaware (in Kent County),
Kent County, Boys and Girls Club, local churches, schools, etc.
Page 2
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 13, 2014 PAGE 2
Benchmarks Established for the Economic Development Office
Mr. Bill Neaton, Economic Development Director, reviewed the benchmarks and results that were
established for the Economic Development Office, which includes the Downtown Dover Partnership
(DDP), Downtown Dover Business Growth, and City-Wide Economic Development.
Mr. Neaton announced that he was just recently elected the Executive Director of the DDP. At his
request, Mr. Ed Perez, Downtown Coordinator, reviewed the benchmarks related to the DDP.
Referring to the number of new businesses in the downtown target area, he noted that the report
reflects four (4) new businesses; however, since its printing, there have been two (2) additional new
businesses for a total of six (6) and eight (8) new jobs. Of the six (6) new businesses, four (4) are
minority/women owned businesses.
Mr. Perez referred to the strategic objective: Advance Initiatives of the Downtown Dover
Partnership - Develop a recruitment strategy to attract new business to downtown with the assistance
of the Recruitment Subcommittee of the Economic Development Committee. He stated that
although this is an ongoing project, the DDP is a part of the Kent County “Open for Business”,
which is a group of economic development network partners, such as the Small Business
Administration, DDP, Economic Development Office, USDA, Delaware State University, Del Tech,
Kent County Executive Director, Score, etc., with the Chamber of Commerce serving as the lead.
This project gives an opportunity for individuals wishing to establish a business, to seek resources
at a “one-stop shop”. To date, there have been 12 inquiries regarding a desire to open small
businesses. He explained that although this does not necessarily mean that there will be 12
additional businesses, it does mean that meetings were held with 12 individuals who have a concept,
and are either looking for space, financing, technical assistance in putting their business together,
etc. In addition, he stated that the DDP is a part of the Kent County Network Group that established
the Annual Summit.
Mr. Perez stated that the DDP continues to update the marketing brochure which includes a current
vacant property list and a map of the downtown district and is made available on the DDP Website.
Mr. Neaton advised members that recently, he and the Mayor met with individuals interested in
property in the downtown area. He had requested that the vacant property list be updated and was
pleasantly surprised that there were only a few store fronts that remain available, noting that
downtown Dover is beginning to revitalize. It was his feeling that this is the result of a very active
Merchants Committee that is a part of the DDP.
As a part of DDP’s support to NCALL, Mr. Perez assured members that information and support is
continuously being provided to NCALL for the “Restoring Central Dover” initiative. The DDP is
currently involved with the Positive Outcome and Strong Community Subcommittees and just
completed the final phase of the plan that will be reviewed and submitted for a grant.
Responding to Mr. Hutchison’s question to Mr. Perez regarding the Loockerman Exchange and the
old Library location, Mayor Christiansen stated that there are two (2) possibilities for the use of the
Loockerman Exchange, one (1) of which is contingent upon the State of Delaware awarding grant
money to Main Street and the other is the development of upscale student housing, explaining that
the owner of that property has met with individuals who are interested in such a concept.
Page 3
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 13, 2014 PAGE 3
In response to Mr. Hutchison regarding E-Z Pass, Mr. Neaton stated that he is in contact with
Ms. Susan Forrester-Coates who is the TransCore Manager for E-Z Pass and reported that E-Z Pass
is pleased with their facility in the downtown area. He noted that there are 85 employees and that
there have been no parking problems. He noted that they have relayed some security concerns;
however, he assured members that he, along with the Mayor and Police Chief, will be meeting with
Ms. Forester-Coats to resolve these issues. Mr. Perez advised members that since E-Z Pass moved
to downtown, other businesses have seen a spike in their sales volume.
Mr. Caldwell relayed his pleasure with the business growth that has occurred in the downtown area
over the past year and hopes that these efforts will continue in the future.
In response to Mr. Anderson regarding the 2013-2014 results in the number of businesses opened
in the Downtown Target Area, Mr. Perez explained that there were 15 new businesses that were open
last year and that 24 jobs were created. Of those businesses, six (6) were minority owned and 11
were women owned, and seven (7) were of the service category, three (3) were of the retail category,
and one (1) restaurant. During this same reporting period, he stated that there were ten (10)
businesses that closed, which resulted in a net of five (5) additional businesses in the downtown
target area. He explained that of those ten (10) businesses, there were over 27 employees and that
some of these businesses were in operation for over 20 years (Simons, Delaware Made, Dreamer’s
Gallery, and Smither’s).
Mr. Neaton advised members that at the request of Mr. Hutchison, the Economic Development
Office created a Development Incentives Awarded Report (Attachment #1). He stated that over the
last five (5) years, there have been 45 incentive packages were issued varying from facade grants to
tax abatements to impact fee waivers, etc. He noted that there was concern that incentive packages
were being provided and then the business would close and there would be no return to the City for
providing the incentives. As reflected in the report, he stated that none of those businesses that were
provided an incentive have closed, which is an indication that the incentive packages are working
as planned and as such, he urged their continuation.
Review of Draft Downtown Development District Application and Proposed Resolution
No. 2014-13 in Support of Application for Designation as a Downtown Development District
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that the Delaware General Assembly enacted the Downtown Development District Act in June 2014.
She explained that under this law, the Governor will designate three (3) Downtown Development
Districts in the first round of designations, one (1) from each county. Development projects within
designated Districts will be eligible for a 20% rebate for project costs over $25,000. She noted that
the City of Dover is well positioned to submit a successful application for Downtown Development
District designation, since the City has several redevelopment incentives in place. In addition, the
City has two (2) master plan documents: The Dover Transit Center Neighborhood Plan and Design
Book; and Restoring Central Dover, that complement each other in support of revitalizing the
downtown.
Page 4
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 13, 2014 PAGE 4
Mrs. Townshend reminded members that staff had previously submitted the proposed District
boundary and some proposed incentives that would be enacted if the City is designated as a
Downtown Development District. She noted that the Downtown Development District application
is due on November 1, 2014 and that although a draft application was provided to members for their
review, staff will continue to refine the application prior to its presentation to City Council for
approval during their Regular Meeting of October 27, 2014.
Mrs. Townshend explained that there are three (3) components of the application for designation as
a District, as follows: 1) the need and impact of the District designation, accounting for 50% of the
consideration given to scoring each application; 2) the quality of the District Plan, accounting for
30% of the consideration given to scoring each application; and 3) the quality of the local incentives
offered, accounting for 20% of the consideration given to scoring each application.
Mrs. Townshend briefly reviewed the application as well as the numerous attachments that will be
submitted. She distributed Attachment #2 of the application - Documentation of Need and Impact
(Photographs) (Attachment #2) which was not included in the packet submitted to the committee,
which will also be made a part of the Downtown Development District Application. Although
Attachment #5 of the application - Letters of Support also was not included in the packet, she
advised members that several letters have been received and that additional letters are anticipated,
assuring members that they will be included in the presentation to City Council on October 27, 2014.
Mrs. Townshend explained that once the application is submitted, the City will be bound to its
contents. As an example, she explained that if the City includes an incentive that would provide a
business license fee waiver for new businesses for three (3) years, the City cannot make any change
to this incentive. She stated that if a Downtown Development District is designated for the City, and
the City does not comply with the plan and does not follow through on incentives, the designation
can be rescinded. Therefore, she stated that this application will result in a commitment from the
City of Dover and require Code amendments.
Members were provided Proposed Resolution No. 2014-13 for their review and recommendation.
Mrs. Townshend advised members that such a Resolution is required to be submitted with the
application that indicates the local government’s desire to apply for the designation as a District, and
the local government’s willingness to adhere to the District Plan and the Local Incentives for the
duration of the District designation.
Staff recommended endorsement of the Draft Downtown Development District application,
acknowledging that staff will continue to refine the application prior to final presentation to City
Council, and adoption of Resolution No. 2014-13 as submitted.
Mr. Hutchison relayed his support for the application and the desire to address home ownership,
which he has been concerned for several years. He felt that the designation will help in this regard.
Responding, Mrs. Townshend stated that there are partners that will also help such as Habitat for
Humanity, Dover Housing Authority, etc. She also noted that with the CDBG Program, the proposed
Consolidated Plan would allow, for purchases within the Downtown Development District, down
Page 5
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 13, 2014 PAGE 5
payment assistance and rehabilitation, explaining that a new property owner wishing to purchase
property could obtain down payment assistance as well as rehabilitation funds from the City, noting
that several properties in the area are in need of maintenance.
Mr. Anderson thanked Staff for the work conducted on the project and Chairman Dixon for
championing the Wells Fargo Grant, noting that the $90,000 has been helpful and an enormous value
to the City. Noting that the designation will require the adoption of ordinances and that staff
proposes their consideration in the Spring of 2015, he questioned if members would be committed
to the language contained in the draft ordinances. Responding, Mrs. Townshend stated that the
proposed Resolution is what is required to be adopted by City Council on October 27, 2014;
however, in terms of any proposed ordinances, which are primarily related to the incentives, she
stated that it is hoped to have them in place by the Spring of 2015. In order to do so, she stated that
staff will begin drafting the proposed ordinances once the application is submitted and expects that
they will be presented to members for their review and recommendation beginning in January 2015.
In response to Mr. Anderson regarding the backlog in housing rehabilitation due to the decline in
federal support, Mrs. Townshend stated that the City could provide some assistance in this matter
through the rebates available through the Downtown Development District Program, although the
first $25,000 would be out of pocket. She stated that other alternatives would be from the next phase
of the Wells Fargo Foundation since housing rehabilitation is under funded. It is anticipated that the
Steering Committee will continue under the leadership of NCALL and that the next grant application
would provide funds for housing rehabilitation. She also noted that within the Restoring Central
Dover Plan, there are different plans such as a volunteer based repair programs that have been
successful in other locations and that Milford Housing has indicated an interest to work with the
City on this a program. As a result, she felt confident that with the implementation of Restoring
Central Dover, there will be other resources the City can investigate, explaining that the rebate
provided under the Downtown Development District Program is only one of those resources.
Responding to Mr. Anderson, Mrs. Townshend stated that it is anticipated that the Restoring Central
Dover Plan will be finalized within the next two (2) months, noting that a draft was just recently
submitted.
Mrs. Horsey noted that according to Map #2B - Downtown Development District with the Land
Development Plan per the 2008 Comprehensive Plan, there is a lot of mixed use within those
boundaries and questioned if it would be desirable. Responding, Mrs. Townshend explained that
Map #2B reflects the adopted Comprehensive Plan. She stated that Staff anticipates some degree
of flexibility in zoning so that the strong residential area does show as medium density residential
and the areas where there are a mix of uses. She felt as more planning has been done in the
downtown area and as the Comprehensive Plan is updated, this area will be reviewed to determine
the best way to move forward.
Mrs. Townshend relayed her appreciation for those employees who have assisted in bringing this
matter forward, Mr. Bill Cook, Planner I, and Mr. Jeremy Gibb, GIS Technician, who have dedicated
a lot of their time on this project.
Page 6
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 13, 2014 PAGE 6
Mr. Anderson moved to recommend approval of staff’s recommendation for the endorsement
of the Draft Downtown Development District application, acknowledging that staff will
continue to refine the application prior to its final presentation to City Council and adoption
of Resolution No. 2014-13, as submitted (Attachment #3). The motion was seconded by
Mrs. Horsey and unanimously carried.
[Clerk’s Office Note: Subsequent to the meeting, Mrs. Townshend submitted a revised Downtown
Development District application for presentation to City Council during the regular meeting of
October 27, 2014 (Attachment #4).]
Mr. Hutchison moved for adjournment, seconded by Mr. Caldwell and unanimously carried.
Meeting adjourned at 4:30 p.m.
Wallace R. Dixon
Chairman
WRD/JG/mk/js/dd/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2014\10-13-2014 PR&CE.wpd
Attachments
Attachment #1 - Development Incentives Awarded Report
Attachment #2 - Downtown Development District Application Attachment #2 - Documentation of Need and Impact
Attachment #3 - Proposed Resolution No. 2014-13
Attachment #4 - Revised Downtown Development District Application
Page 7
ATTACHMENT #1
PR&CE Committee Meeting of 10/13/2014
Page 9
ATTACHMENT #2
PR&CE Committee Meeting of 10/13/2014
Page 21
ATTACHMENT #3
PR&CE Committee Meeting of 10/13/2014
City of Dover
MAYOR AND COUNCIL
1 DRAFT PROPOSED COUNCIL RESOLUTION NO. 2014-13
2 A RESOLUTION IN SUPPORT OF APPLICATION FOR DESIGNATION AS A DOWNTOWN
3 DEVELOPMENT DISTRICT
4 WHEREAS, under the Downtown Development Districts Act, 22 Del.C. §§ 1901 et seq. (the "Act"),
5 the State of Delaware may designate districts within Delaware's cities, towns, and unincorporated areas that
6 will qualify for significant development incentives and other State benefits; and
7 WHEREAS, these districts are known as Downtown Development Districts ("Districts"); and
8 WHEREAS, the State is accepting applications for the designation of the initial round of Districts,
9 with such applications being due on November 1, 2014; and
10 WHEREAS, under the Act, each applicant must submit a plan that includes the boundaries of, and
11 a detailed planning and development strategy for, the proposed District (the "District Plan"); and
12 WHEREAS, under the Act, each applicant must also propose incentives that address local economic
13 and community conditions, and that will help achieve the purposes set forth in the Act (the "Local
14 Incentives"); and
15 WHEREAS, if an application is successful and the City receives District designation, the District
16 Plan and Local Incentives proposed by an applicant shall be binding upon the applicant; and
17 WHEREAS, the incentives associated with designation as a Downtown Development District would
18 greatly benefit current and future residents, businesses, non-profit organizations, and others within the City
19 of Dover; and
20 WHEREAS, the City Council of the City of Dover strongly believes that it is in the best interest of
21 the City of Dover to apply for District designation.
22 NOW THEREFORE, BE IT RESOLVED THAT:
23 1. The City Council supports the Application for Designation as a Downtown Development District
24 prepared by the Dover Planning Office and dated October 27, 2014 (the "Application"); and
25 2. The City of Dover is authorized to appoint a District administrator (the "Administrator") to file
26 the Application on behalf of the City, and to provide such other documents and information as
27 may be necessary or desirable in connection with the Application; and
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 22
DRAFT PROPOSED COUNCIL RESOLUTION NO. 2014-13 PAGE 2
28 3. If the Application is successful and the City of Dover receives notice that it has been selected for
29 designation as a District:
30 a. The City shall adhere to the District Plan and the Local Incentives contained in the
31 Application for the duration of the District designation; and
32 b. The Administrator, or his or her designee(s), is authorized to execute such documents and
33 enter into such agreements as may be necessary or desirable in connection with the
34 Downtown Development Districts program and the rights and obligations of the City of
35 Dover thereunder; and
36 c. The Administrator, or his or her designee(s), is authorized to carry out all District
37 administrative and reporting requirements on behalf of the City of Dover for the duration of
38 the District.
39 ADOPTED: *
40 S:\RESOLUTIONS-PROCLAMATIONS-TRIBUTES\2014\Draft\Resolution No. 2014-13 In Support of the Application for Designation as a Downtown Development District.wpd
41
42 ROBIN R. CHRISTIANSEN DAVID L. BONAR
43 MAYOR COUNCIL PRESIDENT
44 Actions History:
45 October 13, 2014 - Introduced at Parks, Recreation, and Community Enhancement Committee
Page 23
ATTACHMENT #4
PR&CE Committee Meeting of 10/13/2014
Page 24
Downtown Development District Program
How to Use this Application Form
This application is a Microsoft Word document that has been modified. The text in the document
is “locked” meaning that you can’t edit it. The fields where you are supposed to enter
information are “open” allowing you to type or paste information into these fields. The fields that
can be edited are in gray.
First, we recommend that you save this document with a unique file name that includes the name
of your jurisdiction. An example would be “DDD-Application-Dagsboro.” Then you can work
on the document without fear of overwriting it, and when you send it to us we will know who it
came from (and we won’t be in danger of overwriting it).
Some of the fields are informational in nature, such as places to type in the name and address of
your jurisdiction. It should be relatively straightforward to type this information in and save it.
Some of the fields are check boxes, which are similarly straightforward.
Many of the fields are questions that ask you to respond in either 100 or 750 words. You might
find it helpful to write and edit your responses in a separate Word document and then paste them
in to the application once they are complete. The 100 word statement is to be used internally for
review and in printed materials where we need a concise description of each proposed District.
Almost all other questions are suggested to be no more than 750 words, which is about a page and
a half of text (using 12 point font). In these responses it is important to clearly and concisely
answer each question. Your District Plan can go into much more detail about each topic, and it is
appropriate and expected that you will reference your District Plan in these 750 word responses.
There is no penalty for exceeding 750 words, but if you find that you are writing much more than
750 words please consider putting the additional information in your District Plan.
There are numerous attachments mentioned throughout this application. The most obvious one
will be the District Plan. The application also asks for various maps, spreadsheets, letters of
support, resolutions and data to be attached associated with particular questions. Please compile
all of the attachments into one Adobe Acrobat (.pdf) document. It would be wonderful if you
could include a table of contents, and organize these attachments in the order of the questions.
It is likely that when you are done with the application form (Word document) and the
attachments (.pdf document) the combination of both documents will be larger than 15mb, which
is the limit for external email in the State system. In these cases, we will arrange for you to have
access to a sftp file transfer site to upload your documents. Email the OMB Application Team at
OMB_APP_Team@state.de.us to request an account and a password to upload the file. You
must include the following information in your email in order for the OMB Application Team to
process your account access: Name, Company, Email Address, and Phone Number.
OSPC will provide technical assistance with Census data and GIS mapping if requested by local
governments that can demonstrate the need for the assistance. We will provide assistance to all
local governments on the technical aspects of completing this application and transmitting /
uploading finished applications. To request assistance or if you have questions about any part of
this application or the program in general please contact your Circuit Rider Planner at the Office
of State Planning Coordination, (302) 739-3090.
Page 25
Downtown Development Districts
Application for Designation as a District
Section I Completed applications will be
General Guidelines considered by the Cabinet Committee on
State Planning Issues (the Committee).
The Committee will make
The Downtown Development Districts recommendations to the Governor, who
Act of 2014 (the Act) was enacted by the will then designate between one and
General Assembly in order to: three Downtown Development Districts
in the current program year. Additional
• Spur private capital investment in Districts may be designated in future
commercial business districts and program years. The number of Districts
other neighborhoods; is limited to 15 at any one time. District
• Stimulate job growth and designations last for 10 years, and the
improve the commercial vitality Committee can consider up to two five
of such districts and year extensions.
neighborhoods;
• Help build a stable community of Selection as a Downtown Development
long term residents by improving District will entitle private construction
housing opportunities; and projects within the identified District to
• Assist local governments in receive grants to offset 20% of their
strengthening neighborhoods capital construction costs. There are a
while harnessing the attraction host of other benefits that will be
that vibrant downtowns hold for described in more detail in other
talented people, innovative small materials. Grant funds will be
businesses and residents from all administered by the Delaware State
walks of life. Housing Authority (DSHA).
Local governments1 that wish to take Applications must be addressed to the
advantage of this program must identify Office of State Planning Coordination as
a downtown district in their community follows:
and apply for designation. To make an
application for designation this form Mrs. Constance C. Holland, AICP
must be completed, supporting materials Director
must be attached, and the entire packet Office of State Planning Coordination
submitted to the Office of State Planning 122 Martin Luther King Jr. Blvd, S.
Coordination as detailed herein in order
Dover, DE 19901
for the request to be considered.
1
Municipalities and counties are eligible to
Application Due Date for
apply for Downtown Development District FY15 Cycle:
designation. Throughout this document, the
terms “local government” and “applicant” refer November 1, 2014
to either the municipality or county that is
presenting the application.
Released: August 1, 2014 2
Page 26
Downtown Development Districts
Application for Designation as a District
plan and land use regulations support the
Section II
application for the District.
Specific Requirements
The Act identifies three components of
Local governments must identify the application for designation as a
proposed Downtown Development District:
Districts in accordance with the Act.
Districts must include a traditional • The need and impact of the
mixed-use downtown area, commonly District designation;
known as a Central Business District • The quality of the District Plan
(CBD)2. Districts must be no more than • The quality of the local
85 acres in area for jurisdictions with a incentives offered
population under 9,0003 persons, no
more than 170 acres in area for Each of these components will now be
jurisdictions with a population between described in more detail.
9,000 and 30,000 persons, and no more
than 225 acres in area for jurisdictions Need and Impact: The applicant must
with a population over 30,001 persons. describe the need for the economic
Applicants are encouraged to incentives that will be available in
geographically concentrate the designated District. The need must be
incentives to the greatest extent possible. documented through the use of relevant
data and other methods. The conditions
The size and shape of the proposed of the local economy, income, poverty,
District must make sense from an urban homeownership rates, prevalence of
planning and revitalization perspective. vacant or abandoned buildings and other
The applicant must fully describe the metrics may be used to make the case
rationale for choosing the boundaries as that the proposed District is in need of
a part of this application. Guidelines for the incentives.
preparing District boundaries are found
elsewhere in this application. In addition, the applicant must describe
the potential positive impacts that are
A map of the District is required as a likely to accrue due to designation as a
part of this application. Local District. Applicants are encouraged to
governments must also supply maps describe the impacts using both data and
showing the future land use and zoning other methods.
of the district area, and discuss how the
The Need and Impact section will
2
Central Business District: An area around the account for 50% of the consideration
downtown portion of the city or town allowing given to scoring each application.
for higher intensity residential uses as well as
commercial, office, personal services,
governmental, and similar uses intended to serve District Plan – The local government
the community and surrounding areas of the city must present a District Plan that will be
or town. used to guide development activities and
3
Population to be based on the 2010 US Census.
Released: August 1, 2014 3
Page 27
Downtown Development Districts
Application for Designation as a District
revitalization efforts in the District. The Local Incentives – The local
District Plan is to be a detailed government must detail a package of
description of the overall strategy for the local development incentives that will
development of a proposed district. apply within the proposed District.
These incentives may include, but are
The applicant must demonstrate that the not limited to, a reduction in fees or
District Plan is consistent with the local taxes; regulatory flexibility; permit
government’s certified Comprehensive process and licensing reform; special
Plan and the Strategies for State Policies zoning districts; or exemptions from
and Spending and any other local local ordinances. These incentives may
planning documents or studies that are either be currently in place and in use by
applicable. Additionally, if other the municipality or county or they may
governmental, non-governmental and/or be proposed for implementation upon
quasi governmental organizations are designation as a District.
involved with revitalization efforts in the
downtown area they must be identified Upon designation as a District the local
and it must be demonstrated that government is required to implement the
coordination of all activities will be part incentive package as described and
of the District Plan. proposed for the duration of the District
designation. Grant funds will not be
The District Plan should clearly and available to projects until the incentive
concisely describe the key actions and package is adopted by the local
strategies that are in place and / or will government and made available to the
be used to guide growth and project developer. Changes to the
revitalization efforts in the proposed incentive package must be approved by
District. The overall vision of the plan, the Committee. The District designation
the clarity of actions to be taken, and may be rescinded by the Committee if
proof of the ability and the will of the these conditions are not adhered to.
municipality or county and other
partners to implement the plan will be The quality of the Local Incentives will
key considerations when evaluating this account for 20% of the consideration
section of the application. given to scoring each application.
Changes to the District Plan must be Section III
reviewed by the Committee. District Application Instructions
designation may be rescinded if the
District Plan is not adhered to.
Check List - self-explanatory.
The quality of the District Plan will
account for 30% of the consideration Information Sheet - The local
given to scoring each application. government must supply the
jurisdiction's name, mailing address, and
phone numbers. The applicant must
provide the date of the last update of the
Released: August 1, 2014 4
Page 28
Downtown Development Districts
Application for Designation as a District
comprehensive plan and briefly describe form, along with any relevant supporting
the District being proposed. documentation.
Map of the Proposed District – The Written Documentation from
local government must submit a map of Supporting Organizations – The local
the proposed District in sufficient detail government must supply written
to clearly identify the boundaries of the documentation from other organizations
District and calculate its area. Maps that will be relied upon to implement the
should be created with GIS software, District Plan. The documentation must
and the associated computer files should be attached to the “Summary of District
be made available to aid our review of Plan” form.
the proposal. Districts must be
contiguous, and be no more than 85 Summary of Local Incentives – The
acres in area for local governments with local government must complete this
a population under 9,000 persons, no form to summarize the local incentive
more than 170 acres in area for package to be made available within the
jurisdictions with a population between District upon designation. The local
9,000 and 30,000 persons, and no more ordinances (or other regulations or
than 225 acres in area for jurisdictions documentation) enabling and governing
with a population over 30,001 persons. these incentives must be attached to this
There are guidelines detailed elsewhere form, along with any relevant supporting
in this application that must be followed documentation. In the case of incentives
when preparing the proposed District proposed upon designation, the draft
boundaries. Applicants must also supply ordinances must be attached.
maps showing the future land use and
zoning of the district area, and discuss Legislative Body Resolution – The
how the plan and land use regulations local government must attach an adopted
support the application for the District. resolution from the jurisdiction’s
legislative body that indicates the local
Summary of Need and Impact – The government’s desire to apply for
local government must complete this designation as a District, and the local
form to summarize the need for District government’s willingness to adhere to
designation and the potential positive the District Plan and the Local
impact of the district. Supporting Incentives for the duration of the District
documentation should be attached to this designation.
form.
Summary of District Plan – The local
government must complete this form to
summarize the District Plan for the
proposed District. Copies of the District
Plan or Plans must be attached to this
Released: August 1, 2014 5
Page 29
Downtown Development Districts
Application for Designation as a District
Application Cover Sheet and Check List
Jurisdiction Name:
City of Dover
Date of Application October 27, 2014 Date Received
Check List for Application Materials
Application Cover Sheet and Check List.
Information Sheet.
Map of the Proposed District (GIS files encouraged).
Map of Future Land Use in Proposed District (GIS files encouraged)
Map of Zoning in Proposed District (GIS files encouraged)
Summary of Need and Impact (with attachments).
Summary of District Plan (with attachments).
Written Documentation from Supporting Organizations.
Summary of Local Incentives (with attachments).
Legislative Body Resolution.
Released: August 1, 2014 6
Page 30
Downtown Development Districts
Application for Designation as a District
Information Sheet
Municipality / County: City of Dover ______________________________________________
Contact Person for Application Proposed District Administrator (if different)
Name: Ann Marie Townshend Name:
Address: PO Box 475, Dover, DE 19903 Address:
Phone: 302-736-7196 Phone:
Email: atownshend@dover.de.us Email:
Signature Date Signature Date
Date of certified Comprehensive Plan Adopted February 9, 2009 - Certified April 24, 2009
Population of the municipality or county (as per 2010 US Census) 36,041
Population of proposed District (based on 2010 US Census Block data) 1,989
Area of proposed District in acres 220
Brief description of the proposed Downtown Development District (100 words or less)
Note: this description will be used as a summary for internal review and in printed materials
The proposed Downtown Development District encompasses the heart of Dover's downtown
Central Business District and the adjoining residential neighborhoods. The proposed District is
prime for redevelopment, but presents significant challenges as well. The proposed District
includes the area generally bounded by Mary Street to the north, Water Street to the south, the
railroad tracks to the west, and State Street/Governors Avenue to the east. It also includes the
portion of Lincoln Park east of Cherry Street. Lincoln Park is a historically African-American
middle class neighborhood immediately west of the railroad tracks. The east side of this
neighborhood has experienced a deterioration of the housing stock in recent years due to high
concentrations of rental properties.
Released: August 1, 2014 7
Page 31
Downtown Development Districts
Application for Designation as a District
Map of the Proposed Downtown Development District
Instructions: Prepare a map of the proposed Downtown Development District. The map must
clearly show the boundaries of the District. The area of the proposed District, in acres, must be
calculated from the boundaries designated on the map. The following guidelines must be
adhered to when preparing the boundaries of the proposed District:
• The maximum size of the District is 85 acres for local governments with populations
below 9,000, 170 acres for local governments with a population between 9,000 and
30,000, and 225 acres for local governments with populations over 30,001 (population as
per the 2010 US Census).
• Districts must be contiguous.
• Districts must include the streets and right-of-ways within it. These count towards the
maximum acreage.
• Enclaves within District boundaries are not acceptable.
• Prioritizing, phasing and /or timing of redevelopment activities in different geographic
areas of the District is acceptable, and will be considered favorably when it can be
demonstrated that this will concentrate the incentives to achieve specific revitalization
goals.
• If any portion of the proposed District is in the floodplain, the FEMA floodplain map
must be included as a layer on the map. Contact OSPC for technical assistance if needed.
Attach the map of the proposed Downtown Development District
Attach a map showing the future land use in the proposed District from the municipality’s or
county’s certified Comprehensive Plan. Attach a map showing the zoning or land use
regulations that apply to lands within the District. Discuss how the plan and land use regulations
support the application for the District.
It is encouraged that the map(s) be created using GIS software. If the municipality or county is
able to use this software, please submit digital files to our office to supplement the application
and aid us in our review. Please contact OSPC if you need assistance and / or to arrange to
electronically transfer the files.
District Boundaries Map Attached
GIS data is available and will be electronically transferred to OSPC
Name of person who created the map: Jeremy Gibb
Phone 302-736-7025 Email jgibb@dover.de.us
Released: August 1, 2014 8
Page 32
Downtown Development Districts
Application for Designation as a District
Map of the Proposed Downtown Development District - continued
Describe the rationale for choosing the boundaries of the proposed
District (please limit your response to 750 words or less).
The proposed District was chosen based on a number of critical factors. The City's Downtown
Redevelopment Target Area (Target Area) is defined in Dover Code. This Target Area is over
400 acres, so we knew that we needed to shrink the area for our District. In determining how to
shrink the area, we focused primarily on Need and Impact. We removed areas where the need is
not as great and where the beneficiaries would be institutional users. Areas that are within the
City's Target Area defined by code but not within the proposed District boundary include the
State of Delaware complex, the east side of The Green, Wesley College, and Bayhealth Medical
Center. The proposed District includes the traditional Central Business District along
Loockerman Street, the commercial and residential neighorhoods radiating from Loockerman
Street, and the eastern portion of the Lincoln Park neighborhood. These areas include old
buildings which have deteriorated over time, vacant land, and a variety of socioeconomic
challenges.
Attach a map showing the future land use of the District from the local
government’s certified Comprehensive Plan.
Map Attached
GIS data is available and will be electronically transferred to OSCP
Attach a map showing the zoning or land use regulations that apply to
lands within the District
Map Attached
GIS data is available and will be electronically transferred to OSPC
Released: August 1, 2014 9
Page 33
Downtown Development Districts
Application for Designation as a District
Map of the Proposed Downtown Development District - continued
Discuss how the plan and land use regulations support the application
for the District (Please limit your response to 750 words or less).
The Land Development Plan (Map 12-1 from the 2008 Comprehensive Plan) shows most of the
area within the proposed Downtown Development District as a Land Use Classification of
"Mixed Use," which would allow for a variety of zoning designations. The eastern portion of the
Lincoln Park neighborhood, just west of the railroad tracks, and the northwest residential area of
the District are shown as "Residential Medium Density." The far northwest corner, principally
the area where Teal Construction is located (West Street, south of Mary Street), is identified as
"Industrial and Public Utilities." The Transit Center, located at the corner of Water and South
Queen Streets, and properties owned by Wesley College in the northeast portion of the District
are identified as "Institutional." All zoning in the District complies with the Land Use
Classifications in the Land Development Plan.
The proposed District includes a number of different zoning classifications. The commercial
district surrounding Loockerman Street is principally C-2 (Central Commercial Zone), which
allows for a mix of commercial and residential uses. There is no parking requirement associated
with this zone, and properties can be built without building setbacks. This zone was developed
with the intent of allowing for traditional downtown development and uses.
The residential areas within the District are principally RG-1 (General Residence Zone). This
zone allows primarily one-family detached residences. The bulk standards allow for smaller
setbacks and greater lot coverage than the One-Family Residence zones. Many of the RG-1
properties within the proposed District are legal, non-conforming with respect to the current bulk
standards. There is a provision within the RG-1 Zone that allows for administrative waivers of
bulk standards for lots that do not conform with current minimum lot size and dimension
requirements. This allows for many of the small lots to be developed without needing to apply to
the Board of Adjustment for a variance. Within the RG-1 Zone, many single-family detached
homes had previously been converted to roominghouses or apartments. In 2003 and 2006, the
City of Dover changed the provisions of the zone to prohibit roominghouses and the conversion
of single family homes to apartments. These amendments also to apply restrictions for student
housing. There are still many legal-nonconforming apartment houses and student homes. There
are also illegal roominghouses that the Department of Planning and Inspections identifies and
addresses through routine housing inspections. The Restoring Central Dover Plan identifies the
need to evaluate the RG-1 Zone to allow for a variety of housing types. The Planning Office has
begun working on the development of infill standards and the ability to construct different
housing styles within the RG-1 Zone; however, these amendments are not imminent.
The area along State Street is largely RGO (General Residence and Office), which allows for a
variety of residential and office uses. Other zones within the District include C-1A (Limited
Released: August 1, 2014 10
Page 34
Downtown Development Districts
Application for Designation as a District
Commercial), C-2A (Limited Central Commercial), IO (Institutional and Office), C-3 (Service
Commercial), and RG-4 (General Residence Zone for Multi-Story Apartments).
The eastern portion of the District and the central portion of the District are also located within
the Historic District Zone. This Zone is subject to the Design Standards and Guidelines for the
City of Dover Historic District Zone and also to oversight by the Historic District Commission
for exterior improvements to buildings and properties. Within the Historic District Zone, exterior
improvements are subject to an Architectural Review Certificate, which is approved by the City
Planner, the Historic District Commission, or the Planning Commission, depending on the
degree of the proposed improvement. The Standards and Guidelines help to protect the historic
character of the downtown; however, the presence of the Historic District Zone also adds a layer
of review for new construction that adds additional time to the review of new development. The
Planning Office is evaluating options for amending the process to allow for a more streamlined
review without sacrificing the integrity of the Historic District.
The goals of the 2008 Comprehensive Plan, in several chapters and in the Land Development
Plan, support the application for the Downtown Development District. A copy of the 2008
Comprehensive Plan Goals is attached with the related goals highlighted.
Are there other special overlays, districts, or areas that intersect the
proposed District? Examples of such special areas include historic
districts, BID taxing districts, etc. Please describe any of these special
areas and how they will interact with the proposed Downtown
Development District. Include maps, if applicable. (Please limit your
response to 750 words or less).
There are a number of special boundaries that intersect the proposed District. These include: the
Downtown Redevelopment Target Area, the Business Improvement District, and the Historic
District Zone. Maps are provided for each of these boundaries and how they relate to the
proposed district. The Downtown Redevelopment Target Area is the geographic area defined in
Dover Code of Ordinances (Appendix C) where the City offers redevelopment incentives. If
successful in achieving the Downtown Development District designation, the City will review
this boundary to determine how to incorporate the proposed District boundary. The boundary of
the Business Improvement District includes three zones, where commercial property owners pay
a Business Improvement District Tax that helps to support downtown revitalization efforts. The
Business Improvement District Tax supports the operations of the Downtown Dover Partnership,
which serves as Dover's Main Street organization. The Historic District Zone is the area of the
City where specific guidelines and design standards are applied to ensure that the historic
character of the area is preserved. There has been discussion about modifying the boundaries of
the Historic District Zone, but even if modified there will always be a portion of the proposed
Released: August 1, 2014 11
Page 35
Downtown Development Districts
Application for Designation as a District
District within the Historic District Zone.
The proposed District also includes two Historic Districts on the National Register of Historic
Places, as well as sites and buildings individually listed on the National Register. A portion of
the First State Heritage Park is also located within the proposed District, including a number of
State museum sites.
Released: August 1, 2014 12
Page 36
Downtown Development Districts
Application for Designation as a District
Summary of Need and Impact
50%
Instructions: Complete this form to document the need for the District designation and its
potential to positively impact your community. Attachments of data and other documentation
are required. There is no specific page or word limit on the information that can be attached,
however please be aware that applications that provide clear and concise documentation that is
directly related to the need and impact of the District proposal will be scored the highest.
Please describe the need for the Downtown Development District
designation in your community (please limit your response to 750 words
or less).
Dover's downtown was once a thriving hub of activity, including bustling businesses and well-
kept residences. Like many downtowns, suburbanization and the prominance of auto oriented
strip malls of Route 13 have left the downtown underutilized and deteriorating in some areas. A
lot of energy in the last two decades has focused on downtown revitalization. There have been a
number of successes along the way, but success has been spotty and often centered east of
Governors Avenue. A number of factors have created impediments to achieving real success in
downtown revitalzation. The deterioration of existing building stock and costs associated with
renovation of buildings that have been neglected for decades, along with the deterioration of the
downtown neighborhoods due to neglected housing stock, low homeownership rates, and crime,
have created signficant challenges to downtown revitalization. True downtown revitalization
cannot be realized without addressing the deterioration of the downtown neighborhoods that abut
the Central Business District. Failure to address this deterioration not only jeopardizes
revitalization of the Central Business District, but it also jeopardizes the stability of other
residential neighborhoods just outside of the downtown area.
Because the challenges are so significant, the costs of revitalization are high. Developers,
builders, and potential property owners are often deterred from investing in the downtown
because the cost of renovating or building on a property often exceeds the value of the property
with the improvements. Prospective businesses are often undercapitalized and cannot complete
building renovations necessary to make their shops code compliant, purchase their equipment
and inventory, and pay expenses until they are able to turn a profit. There is a sense that it is
easier and less expensive to build new somewhere else. Prospective homeowners are deterred by
perceptions of safety and crime, as well as a high residental rental rate, and the deteriorated
condition of much of the housing stock. This leaves much of the housing inventory in the
downtown area as marginally compliant rental properties, many of which are owned by absentee
or unresponsive landlords.
Released: August 1, 2014 13
Page 37
Downtown Development Districts
Application for Designation as a District
Since 2008, the City has taken a very strong stance on code enforcement and has demolished
many deteriorated buildings both in the downtown area.While demolition eliminates the blight
and safety issues associated with vacant, deteriorated buildings, it does little to revitalize the
neighborhood, as it leaves vacant lots. To achieve success in revitalizing the downtown
neighborhood, replacing demolished buildings with new, occupied homes or other structures is
necessary.
The Restoring Central Dover Plan identifies strategies to address both the deterioration in the
downtown neighborhoods and the economic revitalization of the downtown business district.
Released: August 1, 2014 14
Page 38
Downtown Development Districts
Application for Designation as a District
Summary of Need and Impact – continued
50%
Attach relevant data to that demonstrates and documents the need for
the Downtown Development District designation.
The following table summarizes the required data from the US Census.
Input the data into the summary spreadsheet provided, and attach any
other written documentation that can summarize the data. Contact
OSPC for assistance with the Census data, if needed.
Required Data from the US Census
The municipality or county as a whole
Median Income Poverty Rate Age of Structures % Homeownership
% Rental Vacancy Median Home Value
The Census Tract(s) that contains the proposed District
Median Income Poverty Rate Age of Structures % Homeownership
% Rental Vacancy Median Home Value % Low / Mod Income
The Census Block(s) that most closely correspond to the proposed District
Total Population % Homeownership % Vacancy
Summary spreadsheet and other documentation attached
Please provide any other data that support the municipality’s application
for the District. The following table contains some suggested data
sources that can serve to supplement the required data. Please attach any
that apply, and any other data that is relevant. Cite the source for each
dataset.
Suggested Data from a Variety of Sources
Blight Condemned Properties Code Violations
Crime Statistics Economic Analysis CDBG Program Statistics
Market Studies Redevelopment Authority Activities Public Works Projects
Education Data Infrastructure Condition or Need Other
Additional data and documentation attached
Released: August 1, 2014 15
Page 39
Downtown Development Districts
Application for Designation as a District
Summary of Need and Impact – continued
50%
Describe how the attached data demonstrates the need for the
Downtown Development District designation in your community (please
limit your response to 750 words or less).
The data provided demonstrate the need for the Downtown Development District in Dover, and
specifically in the area chosen for the District.
1. Housing - Based on the data from the 2010 Decennial Census (by Census block), 15.3% of
housing units in the blocks comprising the District were vacant. Of the occupied housing units,
84.4% were rental, and only 15.5% were owner occupied (with or without a mortgage). By
comparison, the American Community Survey for 2008-2012 shows a homeownership rate
within the City of 55.1%.
2. Vacant and Dangerous Buildings - The District includes 49 registered vacant buildings, 7
buildings that have been declared dangerous by staff or City Council, and 25 lots where
buildings have been demolished by either the City or the owner since 2008 due to a dangerous
building declaration. A disproportionate number of vacant and dangerous buildings and lots
where buildings have been demolished are located within the District and areas immediately
surrounding the District. The designated dangerous buildings only reflect the worst of Dover's
building stock. Many other buildings are in marginal but habitable condition, as demonstrated by
the number of active code enforcement cases within the proposed District (See Map #4, 5 and 6).
3. Crime - Map #7 shows crime density within the District. Additionally, the Restoring Central
Dover Plan shows several crime density maps, broken down by violent crimes, property crimes,
and drug crimes. The highest concentrations of these crimes are within the area bounded by
Loockerman, Queen, Division, and State Streets.
4. Poverty and Income - Unfortunately, poverty and income data are not available by Census
block so it cannot be directly correlated to the District boundary; however, anecdotally and by
looking at the housing statistics and condition, the Downtown Development District includes
high concentrations of poverty, homelessness, and low income population. In looking at the
block groups comprising the District, which is geographically larger than the District, 56.7% of
household are low to moderate income. By contrast, the Census block groups which encompass
the City of Dover (although a larger area than the incorporated boundary) show that 44.4% of
households are low to moderate income.
5. CDBG Investment - The City of Dover has invested Community Development Block Grant
(CDBG) funds to improve the downtown area through the housing rehabilitation, infrastructure
rehabilitation, and support of the Dover Interfaith Men's Shelter over the past ten years. Street,
sidewalk and curb rehabilitation was completed for areas of South New Street, South Queen
Street, North West Street, North Kirkwood Street, and Mary Street between 2003 and 2006. Map
#8 shows the locations and types of projects that the City has funded within the District using
Released: August 1, 2014 16
Page 40
Downtown Development Districts
Application for Designation as a District
CDBG funding.
Describe the potential positive impacts of the proposed Downtown
Development District designation in your community. Impacts can
include economic, social and / or cultural impacts among others. Attach
supporting documentation if applicable (please limit your response to
750 words or less).
Downtown Development District designation has the potential to transform Downtown Dover.
The City has struggled with downtown redevelopment for over two decades, and we have seen a
number of successes. Unfortunately success has been hampered by the costs of downtown
redevelopment and the challenges that face the residential neighborhoods of Central Dover,
adjacent to the Central Business District. Designation as a Downtown Development District has
the potential to address both of these challenges.
As it relates to the costs of renovating deteriorated buildings, many of which were built before
indoor plumbing and electric, the incentives that would be offered within the District by the
State, Kent County, and the City of Dover significantly reduce the costs, allowing projects that
would otherwise be infeasible to become feasible. In addition to incentives offered by the State,
Kent County, and the City of Dover, the City will work with other partners, such as the
Sustainable Energy Utility, NCALL, and the Kent County Association of Realtors to leverage
additional resources. The Restoring Central Dover Plan is being developed with the assistance of
a grant through the Wells Fargo Foundation. With the completion of the Plan and District
designation, additional resources for Plan implementation may be available through the Wells
Fargo Foundation. These funds would further leverage the public incentives and private
investment. Through leveraging and pooling resources, projects that previously were infeasible
may now be possible.
The City of Dover and the Downtown Dover Partnership have developed a track record of
success in transforming the vision of a vibrant downtown into a reality. With the plans in place
and resources to support plan implementation and to leverage private investment, the City and
the Downtown Dover Partnership are poised to seek out private sector development partners to
bring the ideas identified in the District Plan to reality. Between November and March, the
Downtown Dover Partnership and the City of Dover will hold a stakeholder/developer forum,
and invite property owners, developers, and the real estate community, to share information
about the Downtown Development District program and all of the potential resources and
incentives available under the program, and to cultivate the partnerships necessary with the
property owners and development community to encourage investment in their properties.
As it relates to the residential neighborhoods that comprise the heart of Central Dover, the
Released: August 1, 2014 17
Page 41
Downtown Development Districts
Application for Designation as a District
Restoring Central Dover Plan offers a variety of implementation measures that would address the
physical, social and economic challenges that have contributed to the deterioration of these
neighborhoods. By infusing resources with clear strategies to improve the housing stock and
increase homeownership, the Downtown Development District Plan and designation provide
momentum, strategies, and resources that were previously unavailable to the stakeholders in the
area. Through partnerships with NCALL, Habitat for Humanity, the Kent County Association of
Realtors, Milford Housing Development Corporation, Dover Housing Authority, and Delaware
State Housing Authority, the City will be in a position to improve the housing stock and promote
homeownership. In addition, the Restoring Central Dover Plan provides a series of economic and
safety recommendations that can be implemented by the City of Dover Police Department and
others to improve safety in the District. This comprehensive approach is necessary to achieve
success. By providing the resources to implement the Plan strategies, a significant impact is not
only possible but probable.
Many resources will be pooled in the area of housing to achieve success in increasing
homeownership. NCALL provides housing counseling and credit repair assistance to prospective
homebuyers. Many of the funding sources available to low to moderate income homebuyers
require housing counseling as a condition of the assistance (for example, the City of Dover's
CDBG down payment assistance). NCALL will also be able to leverage their loan fund as a
Treasury certified lending institution. Dover Housing Authority has agreed to use the Housing
Choice Vouchers to support mortgage payments for low income homeowners. In addition,
Central Delaware Habitat for Humanity and Milford Housing Development Corporation are
enthusiastic about furthering the goal of homeownership in the District. As identified in
Restoring Central Dover, the City of Dover will allow homebuyers in the District to obtain
CDBG funds both for down payment assistance and for housing rehabilitation, so that a
qualifying homebuyer can purchase a home within the District with down payment assistance
and then use CDBG funds also to renovate the property to make it code compliant. With the
current condition of many houses in Central Dover, this in conjunction with the State rebates will
make purchasing a home in the District more attractive to prospective buyers. Kent County
Association of Realtors will also be a key partner in furthering the goal of homeownership. The
City of Dover and NCALL will bring all of the housing partners together to develop an even
more cohesive strategy for successful homeownership growth in late 2014 to turn the
implementation strategies into a clear action plan with performance measures.
Released: August 1, 2014 18
Page 42
Downtown Development Districts
Application for Designation as a District
Summary of District Plan
30%
Instructions: through this application the municipality or county will be presenting the District
Plan that will guide future revitalization, growth and development activities in the District. Upon
designation, the local government will be required to adhere to the District Plan in order to
qualify for grants and other incentives. Attach the District Plan, and summarize the content,
goals, and objectives in the space provided.
The District Plan Checklist is provided as a separate document. The proposed District Plan must
be prepared in accordance with the Checklist.
Attach the District Plan.
District Plan Attached.
Summarize the content, goals and objectives of the District Plan. (please
limit your response to 750 words or less).
There have been a number of planning studies over the years that address redevelopment of
Downtown Dover. The two principal and most recent plans include the Dover Transit Center
Neighborhood Plan and Design Book and the Restoring Central Dover Plan, which is currently
still in draft form. These plans together comprise Dover's Downtown Development District Plan.
The Dover Transit Center Neighborhood Plan is driven largely by design and the form of
downtown redevelopment. By contrast, the Restoring Central Dover Plan addresses many of the
social challenges that have been identified as obstacles to downtown redevelopment. This is the
first plan in recent years that focuses on the social and economic issues that confront the
downtown area. The following goals and objectives are addressed in both plans, although with
slightly different focus.
1) Mixed use development
2) Retail uses within the Central Business District
3) Increase the number/percent of owner-occupied homes
4) Increase the density of development
5) Build on vacant lots
6) Bring buildings close to the street to line the sidewalk
7) Strategic location of open spaces, parks and gateways
Both plans provide more detailed strategies for implementation, many of which require
collaboration among the private, public and non-profit sectors. Over the next six months, the
Released: August 1, 2014 19
Page 43
Downtown Development Districts
Application for Designation as a District
City of Dover will work with stakeholders, including the Downtown Dover Partnership and the
Restoring Central Dover Steering Committee, to develop clear performance measures based on
the goals and implementation strategies articulated in the District Plan and to track and report on
these performance measures so that we can evaluate the short-term and long-term success of our
plan implementation.
Released: August 1, 2014 20
Page 44
Downtown Development Districts
Application for Designation as a District
Summary of District Plan – continued
30%
Please summarize how the local government envisions itself in a
leadership role to guide the successful implementation of the District
Plan (please limit your response to 750 words or less).
The City of Dover envisions itself in a leadership role and as an active partner in the full
implementation of the District Plan. Specifically, the City will provide leadership in the
following three areas:
1) Leadership and Facilitation - As the City works with stakeholders across all sectors, the City
is well-positioned to provide leadership among the stakeholders and to facilitate the various
implementation activities. In this regard, the City will develop outreach materials and help
prospective developer's to navigate the development and/or renovation process, including how to
obtain the available incentives. The City will work in coordination with the Downtown Dover
Partnership and the Restoring Central Dover Steering Committee to facilitate implementation of
the District Plan and to develop and track performance measures to evaluate success in plan
implementation.
2) Financial Incentives - The financial incentives offered by the City are important to the success
of the Downtown Development District Plan in Dover. The cost associated with rehabilitation of
deteriorated buildings and redevelopment in the downtown area is large. The combination of the
State's rebate, Kent County's rebate, and the City's incentives significantly reduces the cost of
downtown redevelopment projects. The City will administer the City's incentives associated with
the District.
3) Regulatory Framework - Several of the implementation strategies relate to the City's
regulatory framework, whether it is the issue of site lay-out, zoning changes, or streamlining the
permitting/development process, modifications to the City's regulatory framework will be
necessary for the success of the program. Many changes have been made to the City's Zoning
Ordinance to streamline the development process, but there are additional changes specifically
referenced within the Restoring Central Dover Plan.
List key implementation strategies for the District Plan. Please also list
any known projects or proposals that can be underway within six to
twelve months of District designation. Key Priority Projects4 should be
4
Key Priority Projects are specific projects identified in the District Plan that are considered to be potential catalysts
for other redevelopment activity and / or contribute to superior urban design or other benefits to the District.
Released: August 1, 2014 21
Page 45
Downtown Development Districts
Application for Designation as a District
identified, if applicable. See the Checklist for more details (please limit
your response to 750 words or less).
The planning documents that comprise the City of Dover's District Plan include a series of
implementation strategies. The following are some of the key implementation strategies:
- Reinforce key intersections with significant new buildings. (This could also include the
renovation and re-use of existing buildings at key intersections.)
- Encourage mixed use development that includes residential uses, as defined in the plan.
- Encourage flexible design criteria based on the project's collective merits to the downtown area.
- Phase structured parking replacement on existing or new surface parking lots to accommodate
additional developmental density.
- Develop overall downtown parking strategy.
- Create expedited permitting process.
- Work to re-establish Dover Police Department downtown foot and bike patrols.
- Expand surveillance camera network.
- Improve lighting in targeted areas.
- Provide additional transitional housing.
- Expand access to housing repair programs and establish rehabilitation revolving loan fund.
- Initiate volunteer based neighborhood housing repair organization.
- Strengthen code enforcement.
- Explore ways to boost homeownership.
- Encourage greater zoning flexibility to enable infill housing development.
- Evaluate ways of providing financial incentives for development in the Central Dover areas.
- Provide assistance in establishing upper-floor apartments along Loockerman Street.
- Build and expand on marketing/branding efforts for the Loockerman Street Corridor and
Central Dover.
- Expand small business development programs for new and existing business owners.
There are a number of projects and implementation strategies that can be started, and possibly
completed, within six to twelve months of District designation. One of the Strategies is to
"reinforce key intersections with significant new buildings." Unfortunately, there are several key
intersections where anchor buildings sit vacant. Attracting viable businesses for these vacant
buildings at key intersections is at least as important as new construction at key intersections.
One building that is prime for a new tenant if the City receives the Downtown Development
District designation is the Priscilla Block Building at the northwest corner of State and
Loockerman Streets. A strong prospective business has approached the City with interest in the
Downtown Development District Program, and has indicated that with the incentives and rebates
available under the program, this site is likely to house a new business.
Upper-floor apartments on Loockerman Street are also likely to be a short-term success of
Downtown Development District designation. Many of the shops on Loockerman Street have
active apartments above them. Others have the potential for apartments, but lack the capital
Released: August 1, 2014 22
Page 46
Downtown Development Districts
Application for Designation as a District
necessary for completing the renovations. The promise of the Downtown Development District
designation has created interest in this area as well.
The addition of new housing units in the Central Dover neighborhoods within the District is also
highly likely within six to twelve months of District designation. With partners on-board,
including Habitat for Humanity, Kent County Association of Realtors, Dover Housing Authority,
and Milford Housing Development Corporation, as well as the availability of land for housing
development, there is strong potential for new housing units to be constructed shortly after
Downtown Development District designation.
Other items that can be addressed in the short-term are: police foot and bike patrols, expansion of
surveillance camera network, improvements to lighting, and amendments to the Zoning
Ordinance to allow for greater flexibilty to spur downtown redevelopment.
The Dover Transit Center Neighborhood Plan and Design Book identifies some "key projects"
that could be catalysts in spurring additional downtown redevelopment. These include
redevelopment of the former "Acme Site", which is currently home to a daycare center and auto
parts store. This property was purchased by the Downtown Dover Partnership and has the
potential to be a mixed use redevelopment project that could lead to additional redevelopment.
The Downtown Dover Partnership has been marketing the project and has completed some land
planning for the site. Unfortunately, to date a development partner has not ben identified. The
added incentives of the Downtown Development District Program could attract a development
partner to the site and facilitate a large-scale mixed use redevelopment project that could spur
additional redevelopment in the area.
Another "key project" is the completion of a building at the Transit Center facility. This has been
a subject of discussion since the Transit Center property was acquired. Unfortunately, the
economic recession has created challenges with attracting a development partner to make this
project feasible.
Other "key projects", such as the consolidation of parking lots on North Street and the creation of
a plaza at the former Collegian Site on Loockerman Street, have been completed. The
construction of the Loockerman Way Plaza provides the opportunity for four building pads along
the plaza's hardscape. The designation as a Downtown Development District may create an
atmosphere where sale and development of these building pads is possible. With the North
Street improvements that were undertaken over the last two years, the Downtown Dover
Partnership and the City of Dover have demonstrated leadership and success in implementing the
Dover Transit Center Neighborhood Plan and Design Book. Not only were the improvements
completed under budget, but the addition of a pocket park at the corner of South Governors
Avenue and North Street is a welcome addition to the project. The pocket park revitalizes a
corner that was once a deteriorated building that the City of Dover demolished. The City
ultimately acquired the property, and together with the Downtown Dover Partnership, turned this
former eyesore property into an asset to the downtown. Even with this addition, the Downtown
Released: August 1, 2014 23
Page 47
Downtown Development Districts
Application for Designation as a District
Dover Partnership returned money to the State of Delaware that had been allocated the project
but still unspent after the project was completed.
Released: August 1, 2014 24
Page 48
Downtown Development Districts
Application for Designation as a District
Summary of District Plan – continued
30%
List any other governmental, quasi-governmental or non-governmental
organizations that will be involved in the creation and / or
implementation of the District Plan. A Main Street organization would
be an example of such an organization. For each organization, describe
how the local government will coordinate their activities to encourage
revitalization and economic development in the District.
1) Downtown Dover Partnership - The Downtown Dover Partnership (DDP) is Dover's Main
Street organization. The DDP works hand-in-hand with City staff, property owners, business
owners, and others in the community to promote downtown redevelopment. The DDP also
serves as the redevelopment corporation for downtown Dover and has overseen a number of
successful redevelopment projects, including brownfield clean-ups and building renovations. The
DDP has agreed to secure an architect and provide funding to assist new businesses with the
architectural services needed to open a new business in an existing tenant space. The DDP will
be a full partner with the City of Dover and other stakeholders in implementing the District Plan
and will continue to play a strong leadership role in making downtown redevelopment a reality.
2) NCALL - NCALL is a Community Development Financial Institution certified by the U.S.
Treasury. They provide housing counseling for prospective home buyers and lend money for
affordable housing and community facilities. NCALL has been the convener of the Streering
Committee and the leader for the Restoring Central Dover Plan. NCALL is a key partner in
working with all stakeholders in implementing the Restoring Central Dover Plan and will
continue to provide leadership in convening the Restoring Central Dover Steering Committee as
we work on plan implementation.
3) Habitat for Humanity - Central Delaware Habitat for Humanity is a key partner in providing
homeownership opportunities to low income families. They have worked closely with the City
throughout their existence, and there are a number of successful Habitat houses in the downtown.
Habitat has been a vital member of the Restoring Central Dover Steering Committee, and will be
a key partner in implementing the plan and achieving the goal of homeownership in the
downtown.
4) Milford Housing Development Corporation - Milford Housing Development Corporation
(MHDC) is a non-profit housing developer who has worked in partnership with the City of
Dover to improve housing opportunities through managing the City's housing rehabilitation and
emergency repair programs which are funded through the Community Development Block Grant
program. MHDC offers a variety of programs and products that will help to further the goal of
Released: August 1, 2014 25
Page 49
Downtown Development Districts
Application for Designation as a District
affordable homeownership opportunities in the downtown area and will be a partner in
revitalizing the neighborhoods within the proposed District.
5) Dover Housing Authority - The Dover Housing Authority has long been a partner with the
City in working to increase homeownership in the downtown area. They have been an active
partner in the Restoring Central Dover Plan and will continue to work to further the goal of
homeownership in central Dover.
6) Wesley College - Wesley College's primary campus is not physically located within the
proposed District, but Wesley is a key stakeholer in the downtown and a key partner in achieving
success in downtown redevelopment. The issues of safety and blight that have plagued
downtown Dover impact Wesley's success in attracting quality students. Wesley has
demonstrated commitment in helping improve the downtown with their commitment to the
Schwartz Center for the Performing Arts and their new Health Sciences Building, both of which
are in the heart of the City's proposed District.
7) Dover Interfaith Mission for Housing - Since their inception in 2007, the Dover Interfaith
Mission for Housing has worked to provide emergency shelter for homeless men. They have
worked with their clients to move them into permanent housing and provide them the resources
they need to gain employment.
8) Kent County Association of Realtors - Kent County Association of Realtors is an instrumental
partner in achieving the goal of increasing homeownership and getting information about
incentives out to prospective homeowners. They are also a key link with the development
community.
9) Sustainable Energy Utility - Restoring Central Dover includes recommendations to improve
lighting in targeted area. The City will work with the Sustainable Energy Utility to address this
through the use of energy efficient LED lighting in an effort to reduce energy use while
improving lighting. This could include improving street lighting as well as porch lighting at
private residences.
Attach written documentation (in the form of letters of agreement,
memorandums of understanding, board resolutions etc) from each of the
above listed organizations indicating support for this application to be
designated as a Downtown Development District and identifying a
willingness to coordinate with the municipal government to implement
the District Plan.
Written documentation attached from all other organizations
Released: August 1, 2014 26
Page 50
Downtown Development Districts
Application for Designation as a District
Released: August 1, 2014 27
Page 51
Downtown Development Districts
Application for Designation as a District
Summary of District Plan – continued
30%
Describe any actions your local government has taken to ensure energy
efficient and environmentally sensitive development, and to prepare for
flooding and sea level rise, if applicable. How will these efforts be
implemented in the proposed District? (please limit your response to 750
words or less).
There is very little, if any, area within the proposed District that is affected by floodplains,
wetlands, recharge areas, or other natural features. The City of Dover prohibits new construction
within the 100-year floodplain, and the City's Zoning Ordinance protects wetlands and buffers
around streams. While there is a small area in the Central Business District that is mapped as an
excellent recharge area, this area is exempted from Source Water Protection Overlay Zone
requirements due to environmental contamination underground from prior land uses.
Specifically within the District, implementation of the District Plan will include clean-up and
redevelopment of brownfield sites. We would also look to the Sustainable Energy Utility to
provide incentives to include energy efficiency improvements with new development and
redevelopment or renovation of existing buildings and sites.
The City's Zoning Ordinance includes provisions to allow solar and wind energy as accessory
uses on properties. The proposed District includes a network of sidewalks along streets and a
number of transit stops throughout the District. The City has an active program for replacing
sidewalks as they deteriorate.
Downtown Dover has a wonderful canopy of street trees that the City has worked hard to
maintain. As trees die or need to be removed, additional street trees are planted. The presence of
tree canopy helps to reduce energy use through providing shade and also helps to improve air
quality and overall quality of life.
Through implementation of the District Plan, densification of land uses and improvements to
bicycle and pedestrian infrastructure will help to reduce vehicle trips and vehicle miles traveled
by having jobs and housing centrally located.
Describe how the District Plan is consistent with your certified
Comprehensive Plan and the Strategies for State Policies and Spending
(please limit your response to 750 words or less).
Released: August 1, 2014 28
Page 52
Downtown Development Districts
Application for Designation as a District
http://stateplanning.delaware.gov/strategies/
The District Plan is consistent with the City of Dover's certified Comprehensive Plan in that it
implements a number of goals and objectives related to downtown redevelopment, economic
development and housing. The Comprehensive Plan specifically calls for creation of a downtown
plan that will improve predictability in the process of downtown redevelopment.
The proposed District is entirely within a Level 1 Investment Area as shown in the Strategies for
State Policies and Spending. This is the highest priority area for State investment. Therefore, the
proposed District and District Plan are consistent with the goals and objectives of the Strategies
for State Policies and Spending.
Released: August 1, 2014 29
Page 53
Downtown Development Districts
Application for Designation as a District
Summary of Local Incentives
20%
Instructions: The municipality or county must complete this form to summarize the local
incentive package to be made available within the District upon designation. The local
ordinances (or other regulations or documentation) enabling and governing these incentives must
be attached to this form, along with any relevant supporting documentation. In the case of
incentives proposed upon designation, the draft ordinances must be attached.
Attach the Local Incentives. The following table includes suggested
local incentives. Please attach any that are relevant, and others that have
not been listed.
Suggested Local Incentives
Fee or Tax Reductions Regulatory Flexibility Permit or Licensing Reform
Special Zoning Districts Exemptions from Local Ordinances Streamlined Permitting
Other
Written documentation attached for all Local Incentives
List the Local Incentives that are already in place. Please detail the
geographic extent of each incentive (i.e. is the incentive available
throughout the entire jurisdiction, or only in certain geographic areas?)
Local Incentive In effect since (approx.) Geographic area covered
City Impact Fee Waivers 2000/2008 Downtown Redevelopment
Target Area
Building Permit Fee Waivers 2000 Downtown Redevelopment
Target Area
Tax Abatement on Value of 2000 Downtown Redevelopment
Improvements Target Area
First Time Homebuyer Transfer 1996 Citywide
Tax Exemption
First Time Homebuyer Transfer 2000 Mary Street to Loockerman
Tax Exemption for Seller Street & Governors Avenue
to West Street
Homeowner Property Tax 2000 Mary Street to Loockerman
Abatement for Owner Occupied Street & Governors Avenue to
Released: August 1, 2014 30
Page 54
Downtown Development Districts
Application for Designation as a District
West Street
Historic Preservation Tax Credit 1998/2000 Historic District Zone
Released: August 1, 2014 31
Page 55
Downtown Development Districts
Application for Designation as a District
Summary of Local Incentives - continued
20%
List any of the existing Local Incentives that will be modified to have
specific benefits to properties in the proposed District.
Local Incentive How modified? Geographic area covered
Transfer Tax Abatement for Seller Modify boundary to DDD Only
of House to First-Time match District boundary
Homebuyer/owner occupied in area
bounded by Mary Street, Governors
Avenue, Loockerman Street &
West Street
Waiver of City Impact Fees (Water Expand beyond multi- DDD Only
& Sewer) story, mixed use
Tax Abatement for owner occupied Modify boundary to DDD Only
housing in area bound by Mary match District boundary
Street, Governors Avenue,
Loockerman Street & West Street
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
List the Local Incentives that are new and will be available only in the
proposed District.
Local Incentive Date enacted (or Geographic area covered
proposed date of
adoption)
Waiver of Business License fee for Spring 2015 DDD Only
new businesses for three years
Rebate of 50% of transfer tax for Spring 2015 DDD Only
qualifying project upon issuance of
Certificate of Occupancy
Released: August 1, 2014 32
Page 56
Downtown Development Districts
Application for Designation as a District
Architectural services support up to Immediately upon DDD Only
$5,000 for renovation for new designation
business or business expansion
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
DDD Only
Summary of Local Incentives - continued
20%
Please describe how each local incentive will be funded. If the incentive
involves a reduction or waiver of taxes or fees, or in-kind services (for
example, expedited permitting utilizing existing staff resources) please
note that here.
Local Incentive Funding Source
Tax abatement and fee waivers All waived income that the City does not receive
due to incentives are a "cost" to the revenue into
the General Fund, except the Impact Fee
waivers, which are a "cost" to the
Water/Wastewater Fund revenues.
Architectural Services Support This will be funded through the Downtown
Dover Partnership budget. In future fiscal years
this may result in a transfer from the City's
General Fund to the Downtown Dover
Partnership in accordance with the City's
approved budget.
Released: August 1, 2014 33
Page 57
Downtown Development Districts
Application for Designation as a District
For each Local Incentive to be provided, please describe the specifics of
how the incentive works (details are needed), and how the incentive
encourages economic development and revitalization in your
community.
For the Building Permit and Impact Fee waivers and the abatement of taxes on the value of the
improvements, the Dover Code prescribes an application process. Applications are submitted to
the Economic Development Office, who reviews the applications in accordance with criteria
prescribed in the Dover Code and makes a recommendation to the City Manager. The City
Manager issues a letter informing the applicant of the incentives for which they have been
approved. The letter is copied to the Department of Planning and Inspections and the Tax Office
so that the incentives can be appropriately implemented. For these incentives, the applicant pays
10 percent of the value of the incentive to the Downtown Dover Partnership.
For the First Time Homebuyer tax incentives, there are forms that are signed by the buyer and
seller at settlement and turned in to the Tax Office. In addition to these incentives, the City offers
down payment assistance to low and moderate income homebuyers. Within the District
boundary, the Planning Office will also recommend expansion of CDBG funding to include
combining the down payment assistance with funds to rehabilitate an existing house.
The process for the Historic Preservation Tax Credit is specified in Dover Code. Application is
made to the Planning Office prior to the proposed rennovation and the credit is reviewed and
approved by the Historic District Commission as a part of the approval of the Architectural
Review Certificate.
Released: August 1, 2014 34
Page 58
Downtown Development Districts
Application for Designation as a District
Summary of Local Incentives - continued
20%
Summarize the package of Local Incentives, and describe how these
incentives will work in concert with the Downtown Development
District benefits to encourage revitalization and economic development
in your proposed District (please limit your response to 750 words or
less).
If the City of Dover is selected for the Downtown Development District designation, the City
will create a package of information about the various incentives available, including those at the
City, County and State level. We will work with our partners in the housing and development
community (such as the Kent County Association of Realtors and NCALL) to promote the
incentives and inform the public. The Downtown Dover Partnership (DDP) will work to recruit
new businesses, using the incentives as a selling point.
As an example of how this could work in Dover, if a prospective business owner had interest in
opening in Dover, typically that person would contact the DDP. The DDP staff or volunteers
would provide them with the packet of information describing the incentives available and would
answer any questions the prospective business owner might have. If there is a tenant space
chosen, the DDP staff would let the prospective business owner know of the architectural
services available through the DDP. DDP staff would also refer the owner to the Department of
Planning and Inspections for an intitial meeting with the Planning Staff, Building Inspector and
Fire Marshal. The applicant would begin the process of applying for a Building Permit and
would complete the incentive paperwork at that time. The combination of Building Permit fee
waiver, Impact fee waiver, tax abatement on the value of the improvements, and waiver of
Business License fees would be cost savings as the project goes through the process. Upon
completion of the project, the applicant would submit the proper paperwork to receive the rebate
from the State and Kent County, and if applicable the Transfer Tax rebate.
While application for State and Kent County incentives would be completed directly with the
appropriate State and County departments, City staff would provide technical assistance to
applicants to assist in navigating the application and rebate processes. City staff will also track
the value of the incentives available on each project. City staff would work with developers to
help them leverage the various resources and incentives available to make their project feasible.
Released: August 1, 2014 35
Page 59
Downtown Development Districts
Application for Designation as a District
Released: August 1, 2014 36
Page 60
Downtown Development Districts
Application for Designation as a District
Legislative Body Resolution
Instructions: Attach a resolution that has been adopted by the legislative body of your
municipality or county. The resolution must affirmatively indicate that the legislative body
supports the application for designation as a Downtown Development District and is willing to
adhere to the District Plan and the Local Incentives for the duration of the District designation.
Date of Resolution October 27, 2014
Resolution Number #2014-13
Resolution Attached.
Released: August 1, 2014 37
Page 61
City of Dover, Delaware
Downtown Development District Application
Index of Attachments
Map Number Title
Map #1 Downtown Development District Boundary
Map #2A Downtown Development District with Existing Land Use
per the 2008 Comprehensive Plan
Map #2B Downtown Development District with the Land
Development Plan per the 2008 Comprehensive Plan
Map #3 Downtown Development District with Current Zoning
Map #4 Downtown Development District with Dangerous
Buildings
Map #5 Downtown Development District with Vacant Buildings
Map #6 Downtown Development District: Properties with Active
Code Enforcement
Map #7 Downtown Development District with Crime Density
Map #8 Downtown Development District with CDBG Locations
Map #9 Downtown Development District with Dover Transit
Center Neighborhood Plan Boundary
Map #10 Downtown Development District with Central Dover
Study Area
Map #11 Downtown Development District with Downtown
Redevelopment Target Area
Map #12 National Register Historic Districts
Attachment Number Title
Attachment #1 2008 Comprehensive Plan Goals
Attachment #2 Documentation of Need and Impact – Photographs
Attachment #3 Demographic Summary
Attachment #4 Existing Incentives
Attachment #5 Letters of Support
Attachment #6 Resolution #2014-13
Attachment #7 Downtown Development District Plan
Page 62
Downtown Development District Boundary St
N Br
th
Smi
rd S
r
Pea
ad f o
St v
nsyl
Mary
N Am Pen
St t
NG N St
n e ri c ania
NQ over at e S ve Ave
an A
Ave
t
u ee C ec
il St
n St ors
N Ki
N Br
rk w o St
est S rd S
on St
Fult sion
ad f o
t E Di
vi
NW od S
Rid
t t
y
gel
t
on S
Fult wy
St
Kings H
St
i v i sion
W D
S Br
adfo
ate S
ed St
W Re rd S
t
od S S St
t
SW r k wo
S Ki
Size: 220 Acres t
tree laza
est r man P
St ock e
For St Minor A ly Lo
es t St
Lincoln St
at e S
n St
ve ocker
ma h St
ad A
S St
rt
W Lo E No
Davis Cir Cherry St
ilro
Ra S Qu S Go
t
Ave
een
S Ne
en
Gre
ors The
St
ver n
n w St
Clare
r St
ghte h St k Ln
Slau WN
o rt B an
ce St
k Ln A
tgun
B an t
Sho
te r S
E Wa
S
ning
ly
B an
St
at er
WW
Legend t SW
est
Parcels
St
Proposed District
th St
¯
Sou
1 inch = 500 feet
Date Printed: August 18, 2014
MAP #1
File: m:\gis_data\projects\tech_mxds
\ddd_maps\proposed_ddd
Department: Public Works GIS
City of Dover, Delaware
Page 63
Downtown Development District with Existing
St
Land Use per the 2008 Comprehensive Plan N Br Smi
th
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
e ri c ania
n
NQ over at e S
ve
an A
Ave
il St
Ave
t
u ee C ec
n St ors
N Ki
N Br
rk w o on St
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
Rid
t t
t
on S
gel y
Fult wy
St
St
sion
W D i v i Kings H
S Br
adfo
ed St
W Re
ate S
rd S
t S St
od S
r k wo
t
S Ki
SW
laza
tree t
r man P
est St ock e
For Minor A ly Lo
es t St
St
Lincoln St
ma n St
h St
at e S
ve ocker rt
ad A
W Lo E No
S St
ilro
Davis Cir Cherry St
Ra S Qu S Go
t
en
Ave
een
S Ne Gre
ors
ver n
St The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
Legend
S
ning
Proposed District Institutional & Public Utilities ly
St
B an
at er
WW
Parcels Mixed Use
Current Land Use
SW
Office
t
Active Agriculture Open Space
Residential
est
Commercial
St
Dover Air Force Base Vacant
St
Industrial
th
Sou
¯
1 inch = 500 feet
Date Printed: September 9, 2014
MAP #2A
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_current_land_use
Department: Public Works GIS
City of Dover, Delaware
Page 64
Downtown Development District with the Land
Development Plan per the 2008 Comprehensive PlanSmith St N Br
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
e ri c ania
n
NQ over at e S
ve
an A
Ave
il St
Ave
t
u ee C ec
n St ors
N Ki
N Br
rk w o on St
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
Rid
t t
t
on S
gel y
Fult wy
St
St
sion
W D i v i Kings H
S Br
adfo
ed St
W Re
ate S
rd S
t S St
od S
r k wo
t
S Ki
SW
laza
tree t
r man P
est St ock e
For Minor A ly Lo
es t St
St
Lincoln St
ma n St
h St
at e S
ve ocker rt
ad A
W Lo E No
S St
ilro
Davis Cir Cherry St
Ra S Qu S Go
t
en
Ave
een
S Ne Gre
ors
ver n
St The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
Legend
S
ning
Proposed District Mixed Use ly
St
B an
at er
WW
Parcels Office
Land Development Plan Open Space, Conservation, Recreation
Active Agriculture Residential High Density
t SW
Commercial Residential Low Density
est
DoverAFB Residential Medium Density
St
Industrial and Public Utilities Train Track
St
Institutional Water
th
Sou
¯
1 inch = 500 feet
Date Printed: September 9, 2014
MAP #2B
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_future_land_use
Department: Public Works GIS
City of Dover, Delaware
Page 65
Downtown Development District with Current
R-8 Zoning
a St
Clar
RG-
IO RG- 1 th S
t
C-3 Smi
IO 1 N Br
RG-
r1 RG- R-
adfo 8 IO
r St Mar y St 1
IO Pea N Am
vani
RG- d St
M
nsyl
3
Pen
n
RG- NG IO N St erica RG-1
RG-1 RG- 1 IO over RG-1
1 a te S Ave
a Av
e
NQ
nors le
RG-1 IO Map
t
C-1 il St
S Cec
ueen Ave
IO
Ln
RG- IO RG-
M
t
1 RG-1
1
rkwo RGO
N Ki
RG- RG- N Br
t RGO
1 on S IO
1 Fult r n St
IPM t adfo visio
est S
IO P en n
od S
t RG- E Di
NW RG- 1 d St Av e
RG- RG- 1 S Am R-10
1 RGO
gel C-3 1
Ri d ve
an A
n St RG-
eric
y St Fulto RG- RGO
1 RG-2
M 1 wy
C- St C-1A
sion Kings H
C-3 1A W Divi RG-
RG-
C-3 1 C-2A
1
RG-1 S Br ed S t IO
C- E Re
C-2A
2A RG-1 r C-
t adfo
RG-1 e ed S 2A C-2A
WR d St S St
RG-
C-3 rkwo
S Ki
1 C-2 ate S
C-2
t
est C-3 RG-1 tree
C-2 laza
SW od S
t nP
IO C-2 rma
RG-1 Minor
St Aly
oocke
For St RG-1 L
est C-2
St C-2A
Lincoln St
IO
C-2 an St
C-2 kerm S St rth S
t
C-
ve W Looc C-2 E No
ad A
RG-1 C-3 3
Davis Cir
ilro
ate S IO
C-2
Ra
C-2
Cherry St
C-2
een
t
S Qu vern
IO sa
Jeru
S Go
C-2 een
IO IO Gr IO
RG-1 RG-1 RGO The
wS
Way S Ne
St
RG-1 ors
er St lem IO C-2A
ght Clare k Ln
Slau Ave
Ban
t
IO
t RGO
RG-1 nce S C-3
C- RGO
k Ln
Ban
tgun
C- 2A
RG-4 Sho 2A
Al y
ning
RGO
IO
Ban er S
t
W Wat
Legend St
est
SW
Proposed District
IO IO IO
TND
Zoning St
IO
Parcels
t
Historic District
th S
Sou
¯
RGO
1 inch = 500 feet St
C-1A
Date Printed: September 9, 2014
CPO uee IO
MAP #3
n
File: m:\gis_data\projects\tech_mxds
C-3 C-3
\ddd_maps\ddd_with_current_zoning_2
Department: Public Works GIS SQ
City of Dover, Delaware
Page 66
ZONING TYPES
For complete text, refer to City of Dover, Code of Ordinances, Appendix B: Zoning
Ordinance.
RG-1 (General Residence Zone) permitting single family dwellings, off street parking with
conditions. Permitted conditionally: Planned Senior Housing Developments, day cares,
churches, schools, hospitals, funeral homes, philanthropic and charitable organizations,
membership clubs, bed & breakfast inns, student homes, and multiple dwellings (but not
allowing multiple dwellings as resulting from the conversion of a single family house to a multi-
family dwelling).
RG-3 (Group Housing Zone) permitting single family dwellings, townhouses, and row houses
for single family group dwellings. Permitted conditionally: Planned Senior Housing
Developments, day cares, churches, schools, hospitals, funeral homes, philanthropic and
charitable organizations, and membership clubs.
RG-4 (General Residence zone for Multi-Story Apartments) permitting single family
dwellings and high-rise apartments. Permitted conditionally are day cares, the sale of
commodities and services accessory to the apartments, churches, schools, hospitals, funeral
homes, philanthropic and charitable organizations, and membership clubs.
RGO (General Residence & Office Zone) permitting single family dwellings, single family lot
line dwellings, duplex dwellings, multiplex dwellings, townhouses, rooming houses for 5 or less
people, garden apartments, and offices. Permitted conditionally: Planned Senior Housing
Developments, day cares, small retail business along S. State Street, bed & breakfast inns,
churches, schools, hospitals, funeral homes, philanthropic and charitable organizations, and
membership clubs.
C-1 (Neighborhood Commercial Zone) permitting convenience retail stores; personal service
establishments; service establishments; restaurants; one-family residences; and apartments and
multi-family dwellings. The size of stores or establishments is limited to 2,500 S.F. of floor
space. Conditionally permitting Planned Senior Housing Developments and day cares.
C-1A (Limited Commercial Zone) permitting retail stores; personal service establishments;
service establishments; restaurants; business, professional and governmental offices; one-family
residences; and apartments and multi-family dwellings. Conditionally permitting drive-throughs
accessory to a permitted use, day cares, and Planned Senior Housing Developments.
C-2 (Central Commercial Zone) allowing retail stores; restaurants; hotels, including bed and
breakfast inns; art galleries and studios; service establishments; personal service establishments;
business, professional and government offices; and apartments and multi-family dwellings,
provided that no dwelling units shall be permitted in the first floor on the street frontage of
Loockerman Street. Conditionally permitting throughout the zone are parking lots and parking
structures as a principal use; places of public assembly; manufacturing, assembling, converting,
altering, finishing, cleaning, or any other processing of products where goods so produced or
processed are to be sold at retail exclusively on the premises, day cares, and Planned Senior
Housing Developments.
City of Dover, Delaware: Zoning Descriptions in Downtown Development District Page 1 of 2
Page 67
C-2A (Limited Central Commercial Zone) permitting retail stores; business, professional and
governmental offices; personal service establishments; restaurants; service establishments;
hotels; places of public assembly; drive-throughs; one-family residences; apartments and multi-
family dwellings. Conditionally permitting social service agencies, day cares, and Planned
Senior Housing Developments.
C-3 (Service Commercial Zone) permitting service establishments, personal service
establishments; business, professional or governmental offices; retail uses accessory to a
permitted use; drive-throughs accessory to a permitted use; wholesale, storage and warehousing
establishments; indoor recreation and amusement establishments; motor vehicle, boat or farm
equipment sales or service (subject to specific regulations); manufacturing with less than 25
employees, and mini-storage facilities. Conditionally permitting day cares and Planned Senior
Housing Developments.
IO (Institutional and Office Zone) permitting business, professional, and governmental offices;
banks; research, design and development laboratories; public and institutional uses; day care
centers; and emergency shelters and transitional housing. Conditionally permitting Planned
Senior Housing Developments, fire arm ranges, correctional facilities, public incinerators, hotels
and restaurants.
M (Manufacturing Zone) permitting manufacturing, assembling, processing or storage of
products/materials, laboratories, wholesale storage and warehousing, building contractors’ yards,
public utility uses, and mini-storage facilities.
H (Historic District Zone) requiring Architectural Review Certifications subject to compliance
with the Design Standards & Guidelines for demolition, construction, reconstruction, alteration or
restoration of any new or existing structure within the designated district.
City of Dover, Delaware: Zoning Descriptions in Downtown Development District Page 2 of 2
Page 68
Downtown Development District with Dangerous Buildings
i th S
t N Br
N St
Sm
at e S
rd S
ad f o
r ED05-076.08-02-40.00 NG
t
Pea ED05-068.17-02-05.00
238 N New St n 223 N Governors Ave
over
St
Declared By Council
t
Declared By Staff
Ave
ors N Am
NQ
il St ED05-076.08-02-58.00 e ri c
u ee C ec 209 N New St
ve
an A
n St Declared By Staff
N Ki
rk w o on St
g el Fult St
Rid vi sion
t E Di
yS od S
ED05-077.05-03-05.00
t
ED05-076.08-01-09.00 45 S New St
200 N West St Declared By Council
Declared By Staff wy
St
sion
Kings H
D i v i
W S Br
adfo
ED05-077.09-01-03.00 t rd S
eed S
105 S Queen St WR t
Declared By Staff ED05-077.09-01-31.00
110 S New St
SW Declared By Council
t
laza
od S
man P
r k wo
est St er
For Minor Lo ock
S Ki
es t St
St
Lincoln St
rma n St
h St
at e S
il
ocke
Ra
rt
W Lo E No
ve S St
Davis Cir Cherry St
dA
roa ED05-076.12-02-70.00 S Qu S Go
t
128 S Queen St en
ors Gr e
een
S Ne
ver n
Declared By Staff
St The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt Ave B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
ning
ly
St
B an
Legend at er
WW
Dangerous Buildings Building Abated by City
t SW
Proposed District Building Demolished by City est
Parcels Building Demolished by Owner St
St
Building Repaired by Owner
th
Sou
¯
1 inch = 500 feet
Date Printed: September 19, 2014
MAP #4
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_dangerous_buildings
Department: Public Works GIS
City of Dover, Delaware
Page 69
Downtown Development District with Vacant Buildings
i th S
t
N Br Sm
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
e ri c ania
n
NQ over at e S
ve
an A
Ave
il St
Ave
t
u ee C ec
n St ors
N Ki
N Br
rk w o on St
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
Rid
t t
t
on S
gel y
Fult wy
St
St
sion
W D i v i Kings H
S Br
adfo
ed St
W Re
ate S
rd S
t S St
od S
r k wo
t
S Ki
SW
laza
tree t
r man P
est St ock e
For Minor A ly Lo
es t St
St
Lincoln St
ma n St
h St
at e S
ve ocker rt
ad A
W Lo E No
S St
ilro
Davis Cir Cherry St
Ra S Qu S Go
t
en
Ave
een
S Ne Gre
ors
ver n
St The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
ning
Legend
ly
St
B an
at er
WW
Vacant Buildings t SW
est
Parcels St
Proposed District
th St
Sou
¯
1 inch = 500 feet
Date Printed: September 9, 2014
MAP #5
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_vacant_buildings
Department: Public Works GIS
City of Dover, Delaware
Page 70
Downtown Development District: Properties with Active Code Enforcement
St th
N Br Smi
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
e ri c ania
n
NQ over at e S
ve
an A
Ave
il St
Ave
t
u ee C ec
n St ors
N Ki
N Br
rk w o on St
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
gel
t t
R id t
on S
yS Fult wy
St
t
sion
Kings H
D i v i
W
S Br
t adfo
eed S
at e S
WR rd S
t S St
od S
r k wo
t
S Ki
SW
laza
tree t
r man P
est St ock e
For Minor A ly Lo
es t St
St
Lincoln St
rma n St
h St
at e S
il
ocke
Ra
rt
W Lo E No
ve S St
Davis Cir Cherry St
dA
roa S Qu S Go
t
en
ors Gr e
een
S Ne
St ver n The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt Ave B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
ning
Legend
ly
St
B an
at er
WW
Proposed District t SW
est
Code Enforcement Cases St
Parcels
th St
Sou
¯
1 inch = 500 feet
Date Printed: September 9, 2014
MAP #6
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_code_violations
Department: Public Works GIS
City of Dover, Delaware
Page 71
Downtown Development District with Crime Data: 2010-2014
i th S
t
N Br Sm
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
e ri c ania
n
NQ over at e S
ve
an A
Ave
il St
Ave
t
u ee C ec
n St ors
N Ki
N Br
rk w o on St
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
Rid
t t
t
on S
gel y
Fult wy
St
St
sion
W D i v i Kings H
S Br
adfo
ed St
W Re
ate S
rd S
t S St
od S
r k wo
t
S Ki
SW
laza
tree t
r man P
est St ock e
For Minor A ly Lo
es t St
St
Lincoln St
ma n St
h St
at e S
ve ocker rt
ad A
W Lo E No
S St
ilro
Davis Cir Cherry St
Ra S Qu S Go
t
en
Ave
een
S Ne Gre
ors
ver n
St The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
ning
ly
St
B an
at er
WW
Legend t SW
Total Incidents 4-6 14-16 Proposed District
est
Within 200 Feet 6-8 16-18 Parcels
St
0 8-10 18-22
th St
1-4 10-14 22+
Sou
¯
1 inch = 500 feet
Date Printed: October 3, 2014
MAP #7
File: m:\gis_data\projects\tech_mxds
\ddd_maps\crime_data
Department: Public Works GIS
City of Dover, Delaware
Page 72
Downtown Development District with CDBG Locations
i th S
t
N Br Sm
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
207 N West St e ri c
n ania
ED05-076.08-02-01.00 over at e S
Year 2009 ve
an A
Ave
il St
Ave
t
C ec
NQ ors
est S
N Ki u ee
NW rk w o
n St St
on St
Fult sion
vi
E Di
t
38 N Kirkwood St t 220 Fulton St
od S
ED05-076.08-04-12.00 ED05-076.08-05-41.00
Year 2009 Year 2009
t
on S
Fult
S
gely
wy
R id 19 N Kirkwood St
o n St
ED05-076.08-04-34.00 Kings H
i vi si
WD
t
Year 2009
S Br
49 S Kirkwood St t adfo
eed S
ED05-076.08-06-23.00 WR rd S
Year 2009 t
t
SW
od S
217-219 W Reed St laza
an P
r k wo
est er m
ED05-077.05-03-03.00 ock
S Ki
For
es Lo
t St
St Year 2009
Lincoln St
rma n St
h St
at e S
il
ocke
Ra
rt
W Lo E No
ve S St
Davis Cir Cherry St
dA
roa S Qu S Go
t
en
ors Gr e
684 Forest St een
S Ne
ED05-076.12-02-39.00 St ver n The
r St Year 2011,2012,2013,2014 w St
ghte Clare
n k Ln
Slau Ave B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
ning
ly
St
Legend
B an
at er
WW
Proposed District CDBG Project Type
Parcels 217-219 W Reed St Rental Rehab
SW
Rehab & Infrastructure Improvements
tDover Interfaith Mission for Homeless
2003-2004 Homeowner Rehabilitation Program est
2005-2006 Homeownership Assistance Program St
MHDC Emergency Home Repairs
th St
R C & D Emergency Home Repairs
Sou
¯
1 inch = 500 feet
Date Printed: September 9, 2014
MAP #8
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_cdbg
Department: Public Works GIS
City of Dover, Delaware
Page 73
Downtown Development District With
Dover Transit Center Neighborhood Plan BoundarySmith St N Br
rd S
r
ad f o
Pea St
Mary v
nsyl
N Am Pen
St t
Ave
N St
ors
e ri c ania
v er n
NQ at e S
ve
N Go
an A
Ave
il St
t
u ee
C ec
n St
N Ki
N Br
rk w o on S
t
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
Rid
t t
gely
on St
Fult wy
St
St
sion
WD
i vi Kings H
S Br
t adfo
eed S S St
WR rd S
t
od S tree
r k wo
t
ate S
S Ki
SW za
ma n Pla
est St ker
For Minor t A ly Looc
es t St
St
Lincoln St
rma n St t
at e S
rt h S
Ra
ocke
W Lo E No
ve S St
ad A
Davis Cir Cherry St
ilro
vern
S Qu
t
een S Go Gre
en
S Ne
The
Ave
St
St w St
hter St k Ln
ors
n
Slau
g Clare o rt h B an
WN
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
ning
ly
St
B an
Legend at er
WW
t SW
Proposed District est
Transit Center Neighborhood Plan Boundary St
St
Parcels
th
Sou
¯
1 inch = 500 feet n St
Date Printed: September 9, 2014
SQ
MAP #9
File: m:\gis_data\projects\tech_mxds
ue e
\ddd_maps\ddd_with_transit_center
Department: Public Works GIS
City of Dover, Delaware
Page 74
Downtown Development District with Central Dover Study
i th S
t Area
N Br Sm
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
e ri c ania
n
NQ over at e S
ve
an A
Ave
il St
Ave
t
u ee C ec
n St ors
N Ki
N Br
rk w o on St
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
Rid
t t
t
on S
gel y
Fult wy
St
St
sion
W D i v i Kings H
S Br
adfo
ed St
W Re
ate S
rd S
t S St
od S
r k wo
t
S Ki
SW
laza
tree t
r man P
est St ock e
For Minor A ly Lo
es t St
St
Lincoln St
ma n St
h St
at e S
ve ocker rt
ad A
W Lo E No
S St
ilro
Davis Cir Cherry St
Ra S Qu S Go
t
en
Ave
een
S Ne Gre
ors
ver n
St The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
Legend ning
ly
St
B an
at er
WW
Proposed District t SW
est
Central Dover Study Area (REVISED) St
Parcels
th St
Sou
¯
1 inch = 500 feet
Date Printed: September 9, 2014
MAP #10
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_study_area
Department: Public Works GIS
City of Dover, Delaware
Page 75
Downtown Development District with Downtown Redevelopment Target Area
th St
N Br Smi
rd S
r St
ad f o
Pea
Mary v
nsyl
N Am Pen
St t
NG N St
e ri c ania
n
NQ over at e S
ve
an A
Ave
il St
Ave
t
u ee C ec
n St ors
N Ki
N Br
rk w o on St
St
Fult
est S
sion
rd S E Di
vi
NW ad f o
t
od S
Rid
t t
t
on S
gel y
Fult wy
St
St
sion
W D i v i Kings H
S Br
adfo
ed St
W Re
ate S
rd S
t S St
od S
r k wo
t
S Ki
SW
laza
tree t
r man P
est St ock e
For Minor A ly Lo
es t St
St
Lincoln St
ma n St
h St
at e S
ve ocker rt
ad A
W Lo E No
S St
ilro
Davis Cir Cherry St
Ra S Qu S Go
t
en
Ave
een
S Ne Gre
ors
ver n
St The
r St w St
ghte Clare
n h St k Ln
Slau WN
o rt B an
ce St
k Ln
B an A
tgun
Sho
t
te r S
E Wa
S
ning
ly
Legend St
B an
at er
WW
SW
Downtown Redevelopment Target Area
t
est
Proposed District St
Parcels
th St
Sou
¯
1 inch = 500 feet
Date Printed: September 9, 2014
MAP #11
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_target_area
Department: Public Works GIS
City of Dover, Delaware
Page 76
National Register Historic Districts St
N Br
th
Smi
rd S
r
Pea
ad f o
St v
nsyl
Mary
N Am Pen
St t
NG N St
e ri c ania
NQ nors at e S ve
over an A
Ave
t
u ee C ec
il St
n St Ave
N Ki
N Br
rk w o St
est S rd S
on St
Fult sion
ad f o
t E Di
vi
NW od S
Rid
t t
y
gel
t
on S
Fult wy
St
Kings H
St
i v i sion
W D
S Br
adfo
at e S
t
eed S
t
WR rd S
od S S St
t
SW r k wo
S Ki
t
tree laza
est r man P
St ock e
For St Minor A ly Lo
es t St
Lincoln St
at e S
Ra
il
rma n St
ocke h St
S St
rt
W Lo E No
ve
Davis Cir Cherry St
dA
roa S Qu S Go
t
een
S Ne ors
en
Gr e
St ver n The
n w St
Clare
r St
ghte h St k Ln
Slau WN
o rt Ave B an
ce St
k Ln A
tgun
B an t
Sho
te r S
E Wa
Legend
S
ning
ly
B an
Proposed District St
at er
WW
Dover Green Historic District t SW
est
Victorian Dover Historic District
St
Parcels
th St
¯
Sou
1 inch = 500 feet
Date Printed: October 23, 2014
MAP #12
File: m:\gis_data\projects\tech_mxds
\ddd_maps\ddd_with_n_h_districts
Department: Public Works GIS
City of Dover, Delaware
Page 77
Attachment #1 –
2008 Comprehensive Plan Goals
Page 78
Table 1-1: Plan Chapter Goals:
Natural Resources Goal 1: Protect the Natural Environment
and Environmental Goal 2: Improve Watershed Quality
Protection Goal 3: Encourage Green Development and Sustainable Energy Practices
Goal 1: Preserve and Protect Historic Resources
Historic Goal 2: Provide and Promote Incentives for Preservation Activities
Preservation Goal 3: Increase Public Information on Historic Resources
Goal 4: Collaborate with Diverse Groups and Governments
Goal 1: Proactively Maintain Existing Infrastructure and Expand
Public Utilities and Infrastructure When Beneficial
Community Goal 2: Enhance Infrastructure to Meet Community Needs
Infrastructure Goal 3: Meet or exceed the State and Federal requirements of the NPDES
permit and Stormwater Management Plan
Goal 1: Provide a System of Interconnected Open Space Areas and
Recreational Opportunities
Goal 2: The City must be prepared to face and quickly address potential
Community disasters both natural and man-made.
Services and Goal 3: The City should provide and Maintain high quality police, fire, and
ambulance services to all residents, properties, and visitors within Dover.
Facilities Goal 4: The City should work to ensure the protection and preservation of its
own resources ranging from natural, historic, and cultural including the
physical facilities containing these resources.
Goal 5: Protect and Preserve the City Owned Resources
Goal 1: Preserve and Maintain the Existing Transportation System
Goal 2: Increase Coordination with Agencies
Goal 3: Develop and Expand Alternate Modes of Transportation
Transportation
Goal 4: Create Recommendations and Policies for Roadways and
Development
Goal 5: Air Quality: The Ozone Challenge
Goal 1: Attract and Retain High-Paying Quality Jobs by Targeting Large
Firms and Businesses to Major Growth Areas in the City
Goal 2: Revitalize Downtown Dover as a Vibrant Town Center Integrating
the Hospital, the Colleges & Universities, the State and City Governments
Economic with Business (Retail and Professional), Housing and Tourism
Development Goal 3: Ensure that Zoning Requirements Encourage the Uses Desired and
Do Not Create Impediments to Desired Business Growth
Goal 4: Create an Environment for Long Term Economic Investment in
Dover Focusing on Green Technology and Entrepreneurial Businesses
Goal 5: Actively Market Garrison Oak
2008 Comprehensive Plan February 2, 2009
Chapter 1: Introduction Page 7
Page 79
Goal 1: Encourage Balanced Housing Opportunities for All Income Levels
Housing & and Phases in Life
Community Goal 2: Preserve Existing Housing Stock
Development Goal 3: Provide Safe Livable Neighborhoods
Goal 4: Provide Homeownership Opportunities for Low/Moderate Income
Source: The 2008 Dover Comprehensive Plan
Table 1-2: Land Development Plan Goals
To develop and maintain an adequate supply of housing of varying type, size,
Residential Land and densities that are aesthetically pleasing and located within neighborhoods
designed or redesigned to promote convenience, conservation, and access to
Uses the greater community, but which are properly buffered through distance and
landscaping from incompatible land uses.
Enhance the role of Downtown Dover as a major employment, residential and
commercial center as well as the symbolic and cultural heart of the
Downtown Dover community, and recognize its unique heritage and historic resources. Provide
for mixed use development allowing greatest variation of uses.
• Continue to facilitate project development processes for construction
in accordance with approved Master Plan Pattern Book and TND
concept.
• Support efforts to implement the road and walking trail connections
linking Eden Hill Farm TND to the existing circulation network.
Mixed Use
• Encourage quality architecture within the development in
accordance with the Pattern Book and intent of the TND Ordinance.
• Participate in the planning for the project’s open space areas
including the area of the historic farm complex, alleys, and southern
portion of the project near Puncheon Run.
Maintain and improve the City’s position as a regional commercial center,
Commercial Land while providing its citizens convenient access to needed goods and services
through well designed and spaced community and neighborhood commercial
Uses centers.
Maintain and improve the City’s position as a center of government,
Government and education, and medicine through support of existing institutions and
Institutional Land encouraging well designed campuses that are integrated into the community
Uses and have room to expand.
Create a more vibrant, growing economy with a broader range of job
Employment opportunities through an increase in office and industrial development in
Centers appropriate and designated areas.
Dover Air Force Create a favorable and compatible environment for Dover Air Force Base
Base through a resolute commitment to provide all reasonable planning
2008 Comprehensive Plan February 2, 2009
Chapter 1: Introduction Page 8
Page 80
Attachment #2 – Documentation of
Need and Impact (Photographs)
Page 81
City of Dover
Downtown Development District Application
Documentation of Need and Impact
The Central Business District
West Loockerman Street is the spine of Dover’s Central Business District. The block of West
Loockerman Street between State Street and Governors Avenue is mostly occupied with busi-
nesses. However, the Priscilla Block Building at the northwest corner of State and Loockerman
Street has been vacant for many years. Also, the amount of vacancy increases and the quality of
the building stock declines as you travel west on Loockerman Street, particularly west of Gover-
nors Avenue.
City of Dover—Downtown Development District Application
Documentation of Need and Impact 1
Page 82
City of Dover
Downtown Development District Application
Documentation of Need and Impact
New buildings, such as the Family Dollar and Bayard Plaza, have helped to move the business energy fur-
ther west on Loockerman Street. These new buildings pose a stark contrast to some of the neighboring
vacant buildings.
City of Dover—Downtown Development District Application
Documentation of Need and Impact 2
Page 83
City of Dover
Downtown Development District Application
Documentation of Need and Impact
The areas of South Bradford Street and South Governors Avenue just off of Loockerman Street experience
the same challenges with building vacancy and condition.
City of Dover—Downtown Development District Application
Documentation of Need and Impact 3
Page 84
City of Dover
Downtown Development District Application
Documentation of Need and Impact
The Dover Transit Center Neighborhood Plan and Design Book recommends transforming the former
Acme site on Governors Avenue (above left) to a multi-story, mixed use building (above right). The
Downtown Dover Partnership owns the property, but the economy has made it difficult to find a develop-
ment partner.
The Residential Neighborhoods
These buildings are located on the north corners of Bradford and Mary Streets. Moving southwest the
quality of the building stock begins to decline.
City of Dover—Downtown Development District Application
Documentation of Need and Impact 4
Page 85
City of Dover
Downtown Development District Application
Documentation of Need and Impact
City of Dover—Downtown Development District Application
Documentation of Need and Impact 5
Page 86
City of Dover
Downtown Development District Application
Documentation of Need and Impact
City of Dover—Downtown Development District Application
Documentation of Need and Impact 6
Page 87
City of Dover
Downtown Development District Application
Documentation of Need and Impact
City of Dover—Downtown Development District Application
Documentation of Need and Impact 7
Page 88
City of Dover
Downtown Development District Application
Documentation of Need and Impact
Division Street
Delaware Route 8, or Division Street, is Dover’s principal east/west route. This road serves as a gateway
to Dover, and the first impression of the State Capital, for visitors from points west, including Washing-
ton, D.C. and Baltimore. Unfortunately, visitors’ first impression of the City of Dover is the view of di-
lapidated buildings, litter, utility lines, and deteriorating curbing and sidewalks.
Coming east, immediately after crossing the railroad tracks, the above landscapes welcome visitors to the
downtown.
City of Dover—Downtown Development District Application
Documentation of Need and Impact 8
Page 89
City of Dover
Downtown Development District Application
Documentation of Need and Impact
City of Dover—Downtown Development District Application
Documentation of Need and Impact 9
Page 90
City of Dover
Downtown Development District Application
Documentation of Need and Impact
The Restoring Central Dover Plan demon-
strates both the need and the opportunity cre-
ated by vacant land and buildings throughout
the downtown. The Plan also shows the high
poverty rate in the downtown area.
City of Dover—Downtown Development District Application
Documentation of Need and Impact 10
Page 91
City of Dover
Downtown Development District Application
Documentation of Need and Impact
The Restoring Central Dover Plan shows the perceived and actual crime hot spots, the community-identified areas with
trash and illegal dumping, the high rate of rental housing, and the low percentage of people who live and work in the
downtown area. The Downtown Development District designation could help to turn around these trends through an
increased investment in the downtown area.
City of Dover—Downtown Development District Application
Documentation of Need and Impact 11
Page 92
Attachment #3 – Demographic Summary
Page 93
City of Dover
Housing and Population
DDD Total of Blocks Percentage
POPULATION
Total 1,989
HOUSING UNITS
Total 873
Occupied 739 84.7%
Vacant 134 15.3%
OCCUPIED HOUSING UNITS, BY TENURE
Total Occupied Housing Units 739
Owner-Occupied w/ Mortgage or Loan 75 10.1%
Owner-Occupied, free & clear 40 5.4%
Renter-Occupied 624 84.4%
Source: 2010 Decennial Census, SF-1, total of all Census blocks in proposed DDD.
Page 94
City of Dover
Summary Demographic Data & Geographic Comparison
City of Dover Kent County Delaware Tract 409 Tract 413 Tract 414 Tract 433 DDD (1)
Total Population 36,259 162,785 900,131 2,540 2,077 3,283 6,060 1,989
Median Household Income $48,117 $55,786 $60,119 $25,774 $33,500 $35,083 $46,719
Poverty Rate, All People 16.9% 12.4% 11.5% 16.5% 41.9% 26.2% 15.3%
% Housing Built 1949 or earlier 10.3% 9.5% 14.4% 40.5% 33.9% 8.5% 15.0%
Total Units Built 1949 or earlier 1,476 6,203 58,479 451 344 137 256
Total Units Built 14,338 65,394 405,883 1,113 1,014 1,620 1,709 873
% Homeownership 55.1% 72.9% 72.7% 39.3% 36.1% 38.6% 46.5% 13.2%
% Rental 44.9% 27.1% 27.3% 60.7% 63.9% 61.4% 53.5% 71.5%
% Vacant Housing Units 13.0% 11.6% 17.7% 20.3% 12.6% 22.5% 16.6% 15.3%
Median Home Value $187,500 $205,100 $241,100 $223,400 $162,500 $186,400 $180,100
Source: ACS-2012 5-Year Data
(1) Downtown Development District, sum of 2010 Decennial Census data, by Census block
Page 95
City of Dover
Population Below Low/Moderate Income Threshold (FY2014)
Census Geography Population
Block % <Low/Mod # <Low/Mod Total
Tract Group
5-BLOCK GROUP AREA
409 1 52.3% 910 1,739
413 1 56.5% 1,080 1,911
414 1 41.2% 775 1,881
414 2 82.6% 1,115 1,349
433 3 57.9% 825 1,424
Total Area 56.7% 4,705 8,304
20-BLOCK GROUP AREA
405 1 49.0% 1,155 2,357
405 2 75.5% 2,125 2,814
405 2 39.4% 475 1,205
407 1 12.3% 255 2,073
407 2 65.1% 940 1,443
407 3 33.3% 475 1,426
409 1 52.3% 910 1,739
410 1 41.8% 875 2,093
410 2 40.3% 1,400 3,473
411 2 53.9% 345 640
412 1 30.1% 620 2,059
413 1 56.5% 1,080 1,911
414 1 41.2% 775 1,881
414 2 82.6% 1,115 1,349
415 1 33.3% 785 2,357
418 3 22.1% 835 3,778
418 1 37.2% 1,160 3,118
433 1 52.3% 675 1,290
433 2 57.6% 965 1,675
433 3 57.9% 825 1,424
Total Area 44.4% 17,790 40,105
Source: PolicyMap and HUD, 2014 HUD FY CDBG income limit data using 2010 Census
geographies
Page 96
Walk
er Downtown Ross St
Development District with Census Tracts
Rd
Ln
Colu
m bia
A ve
N
k nt
Oa po
Du
l St
C a ro
ve
bia A Hw
lu m
Tract
est S
Co y
St
ison
NW N Br 409
Mad Rd
n ey L ak
St Rod
rd S
t
r Willi
am n St i ew
Pea NG ngto
ad f o
Le w
s h i ev
Wa
St
n N St i Dr
over
s
l Rd
at e S
t M
e il l Dr
t H az
ra S
Ave
Cla t
ors v
nsyl
N Qu N Ne Pen
N Am
Clar
a Ex
t
Tract
433 een w St ania
e ri c
St
M ap
il St ve Ave
N Ki an A
C ec wy E D iv
le L n
sH isi on St
King
est S
N Br
rk w o on St
ad f o sion
St
g Fult
NW
i
Rid
iv
t rd S t ED
ely t od S Park
Dr
Carver Rd
Dr
St
ton i vi sion
St
S Br Tract
Wes
WD d St
adfo
E Re e
od S
t
S S ta
413 ckerman St
r k wo
o
SW rd S te S E Lo
S Ki
Fore s t laza
Gibb s Dr
St tre e an P is
Leg
t
est ke rm
Bertrand Dr
L ooc
St
Minor t A ly
St
Mart
in Lu d
lativ
th er King Jr Blv
Lincoln St Ra
e
t
v
ad A Fed
Reese St
S Qu
Cherry S
Paul St ilro Je ru s a le
e Av
S Ne e
ra l S Ea s t
e
een Gr e
e
n
m Wa e
Ave
w St
Th
t
Si St St k Ln
R ees
B an
y
r
ghte
S la u
m on r t h St g t er St
W No k Ln
Sh ot E Wa
C ir e St B an
S un A
ning vern
at e S
S Go
ly
B an
Elm Ter
Tract S St
SW
Ave
t
ls
t
Sau est
414 St ors l Ter
S cu l
bury Sch
ool
nS s Ele
men
tary
Rd t Hol y Cros
Rd
yss
Wem d u ee
Llyo
S New St
Legend SQ
Ruth Hope St
St Ave
n
Proposed DistrictWay a racki
Sack
Census Tract Dover St
S Bradford St
Parcels d
Westview Ter
R
Sunset Ter Monroe Ter
n
¯
rto t
u S
Pine ar
1 inch = 900 feet
Orch
B
Date Printed: October 23, 2014
Janeka Ln
File: m:\gis_data\projects\tech_mxds
Ne
w
Shank Rd d Ave
\ddd_maps\ddd_with_census_tracts
s St
Department: Public Works GIS
City of Dover, Delaware
Lotu
Page 97
Downtown
BG 2 Development
R os
s St District with Census Block Groups
Ln
BG C olu
m bia
A ve
k 2 Oa
C a ro e
mb ia Av
l St Colu
est S
St
ison
NW N Br BG 1
Ma d R d
t R od
n ey BG 1 L ak
ad fo
am S
t
r St ev
Pea Willi gt on
NG Was
hin Le w
ie w
St rd S N St i Dr
n or s
s
l Rd
ate S
t
ov e r
M il l Dr
e
t H az
Cla ra S t
Ave n
Pen
N Qu N Ne
N Am
t
Clar
a Ex syl v
BG 3 een w St
e ri c ania
St
M ap
il St ve Av e
N Ki an A
C ec s Hw
y E Div
le L n
isi on St
King
est S
N Br
rk w o
t
on S ad fo n St
Ri d Ful t vi si o
NW
E Di
od S
rd S t
Park
y St
g el
t t
Dr
Carver Rd
to
Wes S Br
St
i vi sion
WD BG 2 d St
a df o
E Ree
n Dr
t
r kwo
an S
S S ta rm
oc k e
S Ki rd S E Lo
SW
te S
F o re s t laza
Gibb s Dr
St tre e an P Le g
t
est ke rm
Bertrand Dr
t St
t A ly L ooc
od S
Minor
i sl a
Mart
St in Lu
th er King Jr Blv
d
Lincoln St Ra
Fe d tive
Ch erry S
a
ilr o
Reese St
d Av Je ru s a le
S Qu
Paul St e ra l Ave
een S Ne Gre
e Ea s t
e
n
m Wa e St
Av e
t
w St
Si t Th
ter S St
R ees
y
gh
S la u
m on rth St ter St
W No k Ln Sh o t E Wa
C ir e St B an
gun
B an
S Go
t
r th S
ate S
W No A ly
ni ng Elm Ter
S St
ve rn
SW
St
ls or s t
Sau est
St Ave l Ter
S cu l
b ury Sch
ool
nS s Ele
men
tary
Rd t Hol y Cros
d
y ss R
Lly o
Wem u ee
S New St
Legend
Ruth
BG 1 SQ
d St Hope St
Ave
n
Proposed DistrictWay a racki
Sack
Block Group Dover St
S Bradfo rd St
Parcels d
BG 1
Westview Ter
R
Sunset Ter Monroe Ter
n
¯
to
ur S t
Pine ar
1 inch = 900 feet
Orch
B
Date Printed: October 23, 2014
Janeka Ln
w
File: m:\gis_data\projects\tech_mxds Ne
Sh an k Rd d Ave
s St
\ddd_maps\ddd_with_census_blocks
Department: Public Works GIS
City of Dover, Delaware
Lot u
Page 98
Attachment #4 – Existing Incentives
A. Dover Code of Ordinances, Appendix C –
Downtown Redevelopment
B. Dover Code of Ordinances, Chapter 102 –
Taxation, Article III – Realty Transfer Tax (excerpts)
C. Dover Code of Ordinances, Chapter 102 –
Taxation, Article IV – Abatement of Real Estate
Taxes (excerpts)
D. Dover Code of Ordinances, Chapter 102 –
Taxation, Article V – Tax Credits for Historic
Properties
Page 104
Who we Are...
The Downtown Dover
Partnership is a nonprofit
organization dedicated to
revitalizing our Historic
Downtown Business Dis-
trict. The DDP works
hand in hand with the
National Trust for Histor-
ic Preservation’s National Downtown
Main Street Center and
the Downtown Delaware Dover
Main Street Initiative to
create a variety of
programs that serve to
Development
improve our district.
Incentives
DDP EVENTS
First Fridays
Second Saturdays
Capital Holiday 101 W Loockerman St, Suite 1A
Celebration Dover, DE 19904
Home for the Holidays
www.downtowndoverpartnership.com
St Patrick’s Day Parade
Loockerman Way
Farmers Market William E. Neaton, Interim Executive Director
Phone: 302-678-2940
Fax: 302-678-2132
E-mail: wneaton@dover.de.us
Tel 302-678-2940
Page 105
Downtown Dover Development Incentives
WHAT PROJECTS ARE WHAT ARE THE INCENTIVES? DDP INCENTIVES
ELIGIBLE? Waiver of Permit Fees Facade Improvement Grant
New construction or renovation Building, plumbing, mechanical & fire protec- Matching grants from $250 to
projects tion $2500
Located within the target area Impact Fee Waiver
These grants are subject to the review and
Fair market value of the materials Requires multiple story new construction or approval of the DDP Design Committee and
to be used and the labor to be per- renovation on one lot the availability of funds.
formed on the project exceeds the www.downtowndoverpartnership.com
sum of $15,000 Combination of retail, office, residential or
commercial services (at least two)
Is for commercial, office or a
residential use Waiver of City sewer and water impact fees DDP PROGRAMS
Property Tax Waiver
WHAT IS THE TARGET ♦ A variety of financial incentives
10-year waiver of property tax on ♦ Small Business Development
AREA? improvements Workshops
♦ Small Business Loans in conjunction
The geographic boundaries of the
10-year period begins with building permit with the US SBA
downtown redevelopment area are
issuance ♦ Express Technical Assistance
defined in the Dover Code and
Program
include the Business Improvement Contribution to Downtown Dover ♦ Facade Grants to downtown property
District.
Partnership owners for exterior improvements to
The Dover Code can be accessed at their buildings
10 % of the value of incentives must be
http:// www.cityofdover.com ♦ Special events and activities to engage
contributed to the DDP
Select Quick Links—Municipal the community at large
Code A detailed description of these incentives and the
redevelopment target area can be found in the
A map of the target area is provided Dover Code, Appendix C
on rear panel of this brochure.
Page 106
CITY OF DOVER DOWNTOWN DOVER PARTNERSHIP
PO BOX 475 APPLICATION FOR DEVELOPMENT
DOVER DE 19903 INCENTIVES
PLEASE TYPE OR PRINT
I. APPLICANT(S) INFORMATION II. INFORMATION ABOUT YOUR BUSINESS:
Name: Name of Business:
Address: Address:
Phone No.:
Soc. Sec. No.: Phone No.:
Type of Business:
Date Established:
# of Empls: FT______PT__________
Empl. Tax ID No.:
III. SUBJECT PROPERTY DATA:
Location/Address:
Street/P.O. Box City State Zip
Current Usage: _____________________________________________________________________
_____________________________________________________________________
Current Zoning: _____________________________________________________________________
_____________________________________________________________________
Owner's Name: ________________________________________________________________________________________________
Owner's Address:
Street/P.O. Box City State Zip
IV. PROJECT DESCRIPTION (Use additional sheet if necessary):
Provide a description of the proposed project, including its physical features; any land and/or
building acquisition and development; the status and timing of land control, zoning and permits;
and the estimated cost and timing of construction and captial improvements.
Page 107
City of Dover Page 2
Application for Development Incentives
V. ASSURANCES:
All information in the application is complete and true to the best of my/our knowledge. I/We also
have read and understand the Development Incentive Ordinance and agree to contribute ten
percent (10%) of the total value of the incentives received to the Downtown Dover Partnership
for investment in downtown Dover. I/We further understand that if I/we do not comply with
the provisions of the development incentives program, the City may terminate the incentives.
____________________ _______________________________________________
Date Signature of Applicant
VI. STAFF ACTION
Approved Denied
Building Permit __________________
Date
Approved Denied
Tax Waiver ___________________
Date
City Impact Fees Approved Denied ___________________
Date
_________________________________________________________
Signature of City Manager
Page 112
CITY OF DOVER
RESIDENTIAL FIRST-TIME HOME BUYER
AFFIDAVIT OF EXEMPTION
BUYER/SELLER
This form must be accompanied by the State of Delaware Realty Transfer Tax Return and
Affidavit of Gain and Value form 5402. Only properties classified as residential on form 5402,
Part C are eligible for exemption consideration.
NAMES OF ALL BUYERS
___________________________________ _____________________________
___________________________________ _____________________________
ADDRESS OF PROPERTY BEING PURCHASED *
________________________________________________
I/We swear/affirm under penalty of law, that the following statements are true and correct.
I/We, either jointly or individually, have NEVER had an ownership interest in any real
estate, wherever located, which has been occupied as my/our principal residence.
The above purchased property is my current principal residence or i/we intend to make
it my/our principal residence within 90 days following recordation.
______________________________________ ________________________________
______________________________________ ________________________________
Buyer’s Signature Buyer’s Signature
*Property must be situated in the area from Mary St. to Loockerman St. and Governors Ave. to
West St. to be eligible. (Full ordinance may be viewed at www.cityofdover.com Sec102-71(a)(3))
Page 118
Message from the Transfer Tax
City of Dover
Congratulations on the
purchase of your first home!
City of Dover
We are proud to offer this
First Time
Incentive Program to our
first time homeowners in Homeowner
the City of Dover.
Exemption
If you have any questions do
not hesitate to contact one
of our Tax Assessor’s Office
employees who are more
than willing to aid you in
the process and to
answer any questions you
may have. CITY OF DOVER
Tax Assessor's Office
PO Box 7100
Dover, DE 19903
Phone:
302-736-7022
Page 119
Requirements Requirements Information
To receive this First Time Home
Buyer Exemp on, a First Time
Persons who have Home Buyer form must be filled
out and submi ed to the tax
never owned property,
This exemp on shall office at the me of payment of
anywhere, have the the Realty Transfer Tax to the
right to benefit from an apply to the Seller of the City of Dover.
exemp on with the property that qualifies Pursuant to City of Dover
City of Dover Realty for the first me buyer [Ordinance]; no refunds for a
First Time Home Buyer
Transfer Tax. exemp on, but only for Exemp on can be given a er the
The person(s) must live property situated in the recording of the deed has been
made.
in the dwelling within area from Mary Street to
ninety (90) days of Loockerman Street and If, however, the a orney or the
buyer realizes that the
their se lement day Governor’s Avenue to exemp on was not given, and
and must use this West Street. the deed has not been
recorded than a refund can be
property as their
given for the excess transfer tax
principal dwelling. paid to the City of Dover.
We apologize, however no other
excep ons can be made.
Page 123
Attachment #5 – Letters of Support
Page 134
October 22, 2014
Ann Marie Townshend, AICP
Director of Planning & Community Development
Planning and Inspections / Parks and Recreation
P.O. Box 475
Dover, DE 19901
Dear Ann Marie
Congratulations on the City of Dover’s efforts to revitalize its downtown. I understand that
through the leadership of NCALL and the generosity of the Wells Fargo Foundation, the
Restoring Central Dover: Our Vision for Vitality represents a broad-based planning effort that
identifies the challenges facing central Dover and presents strategies to address the challenges.
I understand that the concerns voiced by many stakeholders through the planning process
center around safety and that the Restoring Central Dover makes recommendations to improve
lighting in targeted areas, both through public street lighting and residential porch lighting. The
Delaware Sustainable Energy Utility is a 501(c)3 nonprofit corporation founded by the State of
Delaware for the purpose of provided energy efficiency and clean energy programs to
Delawareans. The Delaware Sustainable Energy Utility would welcome the opportunity to
participate with the City of Dover to improve lighting and energy efficiency through programs
to replace and supplement existing street lights with LED lights. We would also be willing to
work with homeowners to improve porch lighting by helping to support the cost of conversion
of porch lights to LED.
I look forward to speaking to you further about this important project.
Sincerely,
Anthony J. DePrima
Executive Director
109 S. State Street, Dover DE 19901
Office: 302-883-3048 I Fax: 302-736-9717
Tony.deprima@deseu.org I Energizedelaware.org
Page 135
Attachment #6 – Resolution #2014-13
Page 136
City of Dover
MAYOR AND COUNCIL
1 DRAFT PROPOSED COUNCIL RESOLUTION NO. 2014-13
2 A RESOLUTION IN SUPPORT OF APPLICATION FOR DESIGNATION AS A DOWNTOWN
3 DEVELOPMENT DISTRICT
4 WHEREAS, under the Downtown Development Districts Act, 22 Del.C. §§ 1901 et seq. (the "Act"),
5 the State of Delaware may designate districts within Delaware's cities, towns, and unincorporated areas that
6 will qualify for significant development incentives and other State benefits; and
7 WHEREAS, these districts are known as Downtown Development Districts ("Districts"); and
8 WHEREAS, the State is accepting applications for the designation of the initial round of Districts,
9 with such applications being due on November 1, 2014; and
10 WHEREAS, under the Act, each applicant must submit a plan that includes the boundaries of, and
11 a detailed planning and development strategy for, the proposed District (the "District Plan"); and
12 WHEREAS, under the Act, each applicant must also propose incentives that address local economic
13 and community conditions, and that will help achieve the purposes set forth in the Act (the "Local
14 Incentives"); and
15 WHEREAS, if an application is successful and the City receives District designation, the District
16 Plan and Local Incentives proposed by an applicant shall be binding upon the applicant; and
17 WHEREAS, the incentives associated with designation as a Downtown Development District would
18 greatly benefit current and future residents, businesses, non-profit organizations, and others within the City
19 of Dover; and
20 WHEREAS, the City Council of the City of Dover strongly believes that it is in the best interest of
21 the City of Dover to apply for District designation.
22 NOW THEREFORE, BE IT RESOLVED THAT:
23 1. The City Council supports the Application for Designation as a Downtown Development District
24 prepared by the Dover Planning Office and dated October 27, 2014 (the "Application"); and
25 2. The City of Dover is authorized to appoint a District administrator (the "Administrator") to file
26 the Application on behalf of the City, and to provide such other documents and information as
27 may be necessary or desirable in connection with the Application; and
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 137
DRAFT PROPOSED COUNCIL RESOLUTION NO. 2014-13 PAGE 2
28 3. If the Application is successful and the City of Dover receives notice that it has been selected for
29 designation as a District:
30 a. The City shall adhere to the District Plan and the Local Incentives contained in the
31 Application for the duration of the District designation; and
32 b. The Administrator, or his or her designee(s), is authorized to execute such documents and
33 enter into such agreements as may be necessary or desirable in connection with the
34 Downtown Development Districts program and the rights and obligations of the City of
35 Dover thereunder; and
36 c. The Administrator, or his or her designee(s), is authorized to carry out all District
37 administrative and reporting requirements on behalf of the City of Dover for the duration of
38 the District.
39 ADOPTED: *
40 S:\RESOLUTIONS-PROCLAMATIONS-TRIBUTES\2014\Draft\Resolution No. 2014-13 In Support of the Application for Designation as a Downtown Development District.wpd
41
42 ROBIN R. CHRISTIANSEN DAVID L. BONAR
43 MAYOR COUNCIL PRESIDENT
44 Actions History:
45 October 13, 2014 - Introduced at Parks, Recreation, and Community Enhancement Committee
Page 138
Attachment #7 – Downtown
Development District Plan
A. Downtown Development District Plan
Summary
B. Dover Transit Center Neighborhood Plan and
Design Book
C. Restoring Central Dover: Our Vision for
Vitality (10/7/2014 Draft)
Page 139
Downtown Development District Plan Summary
There are a number of planning documents developed in recent years that the City of Dover uses to
guide downtown redevelopment. The two principal and most recent plans include the Dover Transit
Neighborhood Plan and Design Book and the Restoring Central Dover Plan, which is currently still in draft
form. These documents identify a series of clear strategies for the City and other partner organizations
to take in support of revitalizing the downtown commercial district and neighboring residential
community. The support for these documents is found in the City of Dover 2008 Comprehensive Plan.
Together, these documents provide vision, goals, strategies, and specific implementation measures to
revitalize Dover’s downtown core.
The Dover Transit Center Neighborhood Plan and Design Book is driven largely by design and the form of
downtown redevelopment, focusing on buildings that address the sidewalk, open space and gateways,
and pedestrian scale of development. The Restoring Central Dover Plan addresses many of the social
challenges that have been identified as obstacles to downtown redevelopment. Each of the plans
encompasses a slightly different geographic area of the downtown. Maps are included that show the
overlap between the areas addressed in each of the plans and the Downtown Development District
Boundary. A summary of each of the plans is provided.
Dover Transit Center Neighborhood Plan and Design Book
The purpose of the Dover Transit Center Neighborhood Plan and Design Book is “to use the new transit
center as an impetus for redevelopment that will transform and energize the surrounding area.” The
plan was developed through a partnership between the Dover/Kent County Metropolitan Planning
Organization (MPO) and the Downtown Dover Partnership. The project included two phases: a five-day
charrette where the public was invited in to discuss issues and identify ideas and solutions; and the
creation of visual design guidelines that graphically represent the findings and recommendations of the
charrette. The plan analyzed existing development patterns and presented concepts for infill
development that would introduce the density, scale and urban aesthetic found in the historic area to
other areas of the study area. Active buildings would front the street and parking would be located
behind the buildings. The plan identifies the need for increased density surrounding the Dover Transit
Center, as well as additional residential development in the downtown area.
The plan provides recommendations to address building placement and form, parking location,
downtown gateways, plazas and parks. The plan also provides a series of implementation strategies,
some of which have been implemented and others which have not yet been implemented. The plan also
engendered the North Street Improvements implemented by the Downtown Dover Partnership, with
support of funding through the State of Delaware. The North Street Improvements include streetscape
and pavement improvement to North Street between State Street and Governors Avenue, consolidation
of several parking lots on North Street to improve layout and gain spaces, and the conversion of
property known as the Collegian site to a plaza area. These improvements have introduced a new
energy to the downtown, and the Loockerman Way Plaza now serves as the location for the Dover
Farmer’s Market on Wednesday afternoons during the summer, as well as other downtown events.
Page 140
The Implementation Strategies section of the Plan (found on page 46-47), include a series of goal
statements, under which each of the implementation items is listed. These include:
• Establish a business development and retention strategy to promote and enhance overall
business and economic vitality in the study area and downtown.
• Improve the gateways and entrance corridors of the study area with buildings, coordinated
signage and streetscapes that frame views, and provide a sense of arrival.
• Strengthen key North-South and East-West road connections to area activity centers, such as
Wesley College, St. Jones River, Eden Hill Farm and Bayhealth Medical Center Campus.
• Coordinate streetscape and road improvements to provide a better connection between Wesley
College and the southern part of the study area.
• Reinforce the study area with land use and additional mixed use, housing, retail and
cultural/civic uses.
• Establish a coordinated signage and streetscape program to capture and present a consistent
image in the Downtown area.
Restoring Central Dover
The Restoring Central Dover Plan came out of a safety task force convened by the Greater Dover
Committee (now the Greater Kent Committee). The stakeholders convened by the Greater Dover
Committee identified a number of issues that culminated in safety concerns in the downtown area. The
Dover Police Department conducted a resident survey, which identified the concerns of downtown
residents. These concerns included crime, condition of housing, responsiveness of landlords, and other
related challenges. The task force submitted an application to the Wells Fargo Foundation, with NCALL
as the lead agency on the grant, to complete a planning study of the downtown so that we can begin to
develop strategies that will improve the quality of life and safety in the downtown area.
The process was led by the consultant and a Steering Committee representing stakeholder groups
throughout the downtown community. There was a detailed survey that included door-to-door
questionnaires administered by local stakeholders trained by the consulting team. The consulting team
also completed a detailed land use survey and building condition survey. With the results of these
surveys, the Steering Committee and consulting team hosted a week-long open house, where members
of the public could participate in interactive processes to provide input on the challenges and potential
solutions facing central Dover. Once the consulting team compiled the results from the Open House,
they presented preliminary recommendations in a public workshop. Then members of the Steering
Committee provided feedback on the recommendations and strategies to ensure that the
recommendations in the plan met the local need. The plan is nearing completion and still in draft form,
but the recommendation section has been released in draft form and addresses strategies for improving
redevelopment opportunities in the downtown area.
As with the Dover Transit Center Neighborhood Plan and Design Book, and other downtown studies
before it, Restoring Central Dover addresses the need to improve housing, attract residents, and
increase homeownership. This plan goes further with its recommendations relating to housing than
Page 141
prior planning studies and includes a series of implementation strategies directly related to improving
the housing stock, redevelopment of vacant residential land, and improving the homeownership rate.
The Restoring Central Dover Plan compares demographic information for the plan study area with the
City as a whole, and identifies some of the significant demographics that create challenges in Central
Dover. As it relates to the 2010 U.S. Census, Central Dover has a higher rate of vacant housing units
(14% vs. 8%), a much higher rate of rental versus owner-occupied housing units (75% vs. 48%), a higher
percentage of non-family households (53% vs. 42%), and higher concentrations of crime.
Restoring Central Dover is the first of the plans for Downtown Dover that includes strategies to address
the complex social challenges facing Central Dover. Other studies have identified that perceptions of
safety pose challenges to downtown redevelopment, but Restoring Central Dover goes further in
analyzing these social challenges and developing community-based strategies to address them.
Restoring Central Dover identifies a number of goals, grouped by three categories, each with specific
recommendations:
• A Strong Community
o Build Community Capital
o Prevent Crime and Increase Public Safety
o Engage Youth in Community
o Expand Adult and Family Services
• Positive Development
o Strengthen Existing Housing Stock
o Support New Housing and Mixed Use Development
o Encourage Reinvestment in Commercial Corridors
o Focus on Economic Development and Inclusion
• An Integrated Public Realm and Infrastructure
o Improve Transportation Infrastructure
o Enhance Open Spaces and Expand Green Infrastructure
The housing strategies included under “Positive Development” provide the structure and partnerships
needed to successfully increase the homeownership rate. Through housing counseling provided through
NCALL, leveraging a variety of financial resources, and support through many partner providers, we can
work collectively to renovate deteriorated housing stock, construct new housing, and bolster
homeownership. Through leveraging such resources as Housing Development Fund, NCALL’s Loan Fund,
City CDBG funds, Housing Choice Vouchers administered through Dover Housing Authority, NCALL’s
housing counseling services, and the expertise of partners such as the Kent County Association of
Realtors, Milford Housing Development Corporation, and Central Delaware Habitat for Humanity,
central Dover’s residential neighborhoods can be successfully revived.
NCALL will submit an application for implementation funding to the Wells Fargo Foundation in fall 2014.
If successful, up to $750,000 would be available for implementation of the Restoring Central Dover Plan.
Page 142
This funding would further leverage the investment of State dollars through the Downtown
Development District.
Bringing Together the Plans and the Downtown Development District
When taken together, the Dover Transit Center Neighborhood Plan and Design Book and the Restoring
Central Dover Plan provide a roadmap for downtown redevelopment in Dover that addresses the
physical issues of building design and placement, gateways and open space, the transportation network,
business retention and recruitment, the mix of land uses, and a housing strategy. Both plans were
developed with significant stakeholder involvement and complement each other in terms of how they
address downtown redevelopment. The geographic study area for each of the plans is slightly different,
but there is significant overlap. Dover’s defined Downtown Development District boundary includes an
area that overlaps with both study areas but places priority on areas with the greatest need. The
Downtown Development District includes the area immediately surrounding the new Transit Center, the
Loockerman Street corridor, and the residential neighborhoods abutting the downtown business district.
Goals and recommendations presented in both plans provide a strategy for implementation of the
Downtown Development District that balances the need for reinvestment in distressed commercial
properties with revitalization of residential neighborhoods and the growth of homeownership. Success
in both of these realms has shown to be costly and frequently economically infeasible. The added
resources of the State’s incentives with the Downtown Development District, Kent County’s match to
this investment, private investment, and Dover’s existing and added incentives will make redevelopment
of Dover’s commercial and residential core economically feasible.
In the coming months, the City of Dover will work with the Downtown Dover Partnership and the
Restoring Central Dover Steering Committee to develop performance measures to track success of the
plan implementation. Such performance measures will likely include measures such as: number of new
homes constructed within the District, number of houses rehabilitated within the District, number of
owner-occupied homes within the District, number of permanent jobs within the District, number of
previously-vacant commercial buildings occupied, assessed value of property within the District, and
other similar measures that would document the impact. Once developed, these measures will be
submitted to the Office of State Planning Coordination and reported on regularly.
Page 204
Dover Transit Center Neighborhood Plan
Page 205
OUR VISION FOR VITALITY
10.23.2014 DRAFT
Page 206
RESTORING CENTRAL DOVER LEADERSHIP STEERING COMMITTEE MEMBERS
The Restoring Central Dover Plan was made possible by generous funding Debbie Armstrong, United Way
from the Wells Fargo Regional Foundation, SPEER Trust, the City of Dover, Paul Bernat, Dover Police Chief
NeighborWorks America, Federal Home Loan Bank of Pittsburgh, and Dianne Bogle, Capital School District
NCALL Research, Inc. The plan process was led by NCALL Research, Shelly Cecchett, Greater Kent Committee
Inc. and a commited Steering Committee comprised of local stakeholders, David Clendaniel, Dover Federal Credit Union
elected officials, residents, and service providers. Susan Cooper, Dover Presbyterian Church
Elizabeth Daniels, Neighborhood Representative
PLANNING TEAM Wallace Dixon, Dover City Council
Tenish Gregory, CenDel Foundation
INTERFACE STUDIO LLC V LAMAR WILSON ASSOCIATES Pastor Will Grimes, Solid Rock Baptist Church
Scott Page, Principal Lamar Wilson, Principal Tracey Harvey, City of Dover, Planning and CDBG
Leah Murphy, Principal Clay Hammond, Delmarva Black Chamber of Commerce
Rapheal Randall, Urban Designer Kent Hurst, Wesley College
Chanda Jackson, Neighborhood Representative
ABOUT NCALL Jeanine Kleimo, Dover Interfaith Mission for Housing
Herb Konowitz, Dover Interfaith Mission for Housing
The National Council on Agricultural Life and Labor Research Fund, Inc.
Bishop Marion Lott, House of Pride
(NCALL), based in Dover, Delaware, was incorporated in 1955 and began
Mike Metzing, Bayhealth
providing housing development services in 1976; added homeownership
Joe Myer, NCALL
education and counseling in 1989; became a U.S. Treasury-certified
Bill Neaton, City of Dover, Economic Development
Community Development Financial Institution (CDFI) in 2004 in order to
Ed Perez, Downtown Dover Partnership
provide housing and community facility lending; launched financial literacy
Maggie Pleasant, NCALL
training in 2005; added default & foreclosure prevention counseling at
Delcina Ramsey, Public Ally
the end of 2007; and was selected as the Kent County partner for the
Mary Reed, Dover Presbyterian Church
$tand by ME® financial coaching initiative in 2012 and became lead
Ida Rios, Neighborhood Representative
organization for the Restoring Central Dover planning initiative in 2013.
Michael Rogers, Interdenominational Ministerial Association
NCALL has become a leader in affordable housing development and
Reuben Salters, Inner City Cultural League
services in Delaware, creating affordable housing alternatives and helping
Ami Sebastian-Hauer, Dover Housing Authority
families statewide to access and maintain homeownership.
Pauline Smith, Neighborhood Representative
Karen Speakman, NCALL
Roy Sudler, Neighborhood Representative
Jocelyn Tice, Central Delaware Habitat for Humanity
Ann Marie Townshend, City of Dover, Planning and CDBG
Amy Yarnell, Wesley United Methodist Church
RESTORING CENTRAL DOVER
Page 207
Restoring Central Dover, “Our Vision for Vitality,”is an initiative
that grew out of the CenDel Foundation’s Safety Task Force and broadened into a community wide effort to
work at revitalization planning for central Dover. The planning process has been amazing and very engaging.
Thank you to Steering Committee members who invested so much time, energy, and enthusiasm throughout
the past year and worked through the thoughtful and exciting recommendations herein. Thank you to Interface
Studio for your expertise and guidance in crafting this creative blueprint. Thank you to residents who assisted
with the community survey, attended the Community Leadership Institute, helped organize block parties, and
put their heart into this effort.
This plan looks at affordable housing, business development, strong community, and infrastructure needs for
central Dover to become a vibrant business corridor and community as our State Capital.
The plan is meant to be a living document that guides our implementation steps both now and years to come.
No doubt there will be changes and modifications as efforts evolve, as new partnerships and collaboration
takes place, and as new funding becomes available. The recommendations within this plan will be evaluated
regularly with the goal of making them even more applicable and achievable.
With the completion of this plan, Restoring Central Dover will transition into the implementation phase. Central
Dover has a wealth of assets and some very real needs. We believe this plan will enable central Dover to
become even a more wonderful place to live, work and play.
As you view this plan and its vision, please think about what role you might play to make it a reality, whether
it be your leadership, support, or funding.
Sincerely,
Joe L. Myer, Chair
Restoring Central Dover
OUR VISION FOR VITALITY
Page 208
TABLE OF CONTENTS
RESTORING CENTRAL DOVER IN CONTEXT 1 PLAN RECOMMENDATIONS 15
INTRODUCTION 2 ONE A STRONG COMMUNITY 17
Purpose of the plan............................................................................................................2 1. Build community capital........................................................................19
Planning context.................................................................................................................3 2. Increase public safety.............................................................................23
Planning process................................................................................................................4 3. Engage youth in community............................................................27
Putting the plan together.............................................................................................6 4. Expand adult and family services.................................................29
A SNAPSHOT OF CENTRAL DOVER 9 TWO POSITIVE DEVELOPMENT 31
Welcome to Central Dover.......................................................................................9 5. Strengthen existing housing..............................................................33
Existing conditions take-aways..........................................................................10 6. Support new development...................................................................37
7. Reinvest in commercial corridors................................................41
OUR VISION FOR VITALITY 14
8. Ensure equitable economic development............................45
THREE AN INTEGRATED PUBLIC REALM AND
INFRASTRUCTURE 47
9. Improve transportation infrastructure.........................................49
10. Enhance open spaces and expand green infrastructure..57
RESTORING CENTRAL DOVER
Page 209
APPENDICES 61
APPENDIX A: IMPLEMENTATION APPROACH 61
Capacity to implement: challenges and opportunities....................62
Priority action items......................................................................................................62
Implementation matrices..........................................................................................65
APPENDIX B: EXISTING CONDITIONS 73
Census data.......................................................................................................................74
Other data sources.....................................................................................................83
Physical survey................................................................................................................95
Neighborworks resident survey......................................................................101
Open house public input.....................................................................................107
Page 210
RESTORING CENTRAL DOVER
Page 211
RESTORING CENTRAL
DOVER IN CONTEXT
OUR VISION FOR VITALITY
Page 212
INTRODUCTION
PURPOSE OF THE PLAN
In 2013, a “Central Dover Neighborhood Planning” collaboration was
convened between NCALL, the CenDel Foundation/Greater Kent
Committee, Dover Interfaith Mission for Housing, and the City of Dover
(including the Downtown Dover Partnership and Dover Police Department)
to address the high-priority needs of low-income Central Dover residents
with the goal of achieving long-term benefits by way of affordable housing,
neighborhood safety and desirability, opportunities for economic growth,
and essential services for children and families. With generous support
from the Wells Fargo Regional Foundation and other sources, NCALL and
its partners initiated the Restoring Central Dover planning process and
recruited a steering committee comprised of local stakeholders, elected
officials, residents, and service providers to lead a community-driven vision
with the goal of ultimately establishing a solid community infrastructure
that will result in long-term and successful revitalization and meaningful
opportunities for residents.
Over the course of the year-long process, concerned residents, community
groups, neighborhood-based institutions, city representatives, and local
businesses were engaged in generating ideas for a better community and
the ways in which we can all help to achieve that vision together. As this
vision began to take shape, plan leadership recognized the need for this
initiative to focus on where efforts should be placed within the next five
years to establish a foundation for longer-term positive change. With an
eye towards truly Restoring Central Dover, this plan is centered on short-
term incremental strategies founded on the idea that revitalization is about 01 Restoring Central Dover planning area
reinvesting in both people and in place. This plan is intended to:
> Empower community members as agents of change in Central Dover > Bring resources to support the needs of disadvantaged residents and
> Strengthen neighborhood streets and expand affordable housing families
options > Revitalize Loockerman as a vibrant commercial corridor and asset to
> Raise the profile of Central Dover to attract new residents, businesses, adjacent neighborhoods
and investment > Coordinate the efforts of the city, nonprofit organizations, churches
> Expand economic opportunity and ensure that the revitalization of and residents to make the most of resources
Central Dover benefits all residents > Assure informed funding decisions and secure resources for
neighborhood investments
2 RESTORING CENTRAL DOVER
Page 213
This document represents extensive hours of work volunteered by the in the target area have been brought up to housing code through the
many residents, stakeholders, and local leaders dedicated to envisioning homeowner rehabilitation program.
a path towards Restoring Central Dover. The planning process itself
was a critical step towards plan implementation, as the members of the The City of Dover’s Comprehensive Plan and annual CDBG Action
plan’s leadership recognize that they will be agents of change in Central Plan have led to an increased emphasis on building codes and
Dover and will continue to collaborate in realizing the goals and objectives their enforcement, resulting in the demolition of several dilapidated
outlined in this plan. properties, the construction of some new buildings (including affordable
apartments) in the business district, and the upgrading or renovation
PLANNING CONTEXT of other properties. To a great extent, the success of Restoring Central
Dover will rely upon close coordination with the City’s own ongoing
A number of planning initiatives have been completed or are currently planning initiatives and allocation of resources.
underway in and around Central Dover that have helped and will continue
to help guide the City and local partners in bringing about positive change. > ECONOMIC INCLUSION STUDY OF DOVER
This plan seeks to reinforce and incorporate the results of these prior Commissioned by the DelMarVa Black Chamber of Commerce
planning efforts while providing an overarching vision for Central Dover (DBCC), the City-funded Economic Inclusion Study of Dover is
coordinated with ongoing planning processes. Each of the following currently underway and is is modeled off of a similar analysis of
plans provided valuable insight and direction to the development of these Pittsburgh, PA concluding that, among other contributing factors,
recommendations. racial equity and inclusion are cornerstones of sustained development
and successful, healthy economies for that particular region. The
COORDINATION WITH ONGOING INITIATIVES: Restoring Central Dover plan and the prospects of it leveraging public
It is important to realize that Restoring Central Dover is one among and private resources present a unique opportunity to advance both
multiple initiatives currently underway that will bear great relevance to agendas by linking economic inclusion as a policy and practice with
implementation efforts emerging from this process. Part of the mandate community revitalization as a goal.
for this plan is to ensure active coordination with these other activities:
FOUNDATIONAL DOCUMENTS
> CITY OF DOVER BICYCLE AND PEDESTRIAN PLANS As demonstrated above, there is a lot of ongoing planning work intended
During the Restoring Central Dover planning process, the City of Dover, to bring local partners together and improve Central Dover. To be truly
the Dover/Kent County Metropolitan Planning Organization, and the effective, this work must also build upon the foundation set by the plans
Delaware Department of Transportation released drafts of updates and strategies that have come before. These include:
to the City’s bicycle and pedestrian plans. The community expressed
great interest in addressing a range of mobility issues as a part of > DOVER TRANSIT CENTER NEIGHBORHOOD PLAN AND
Restoring Central Dover, and the feedback and recommendations put DESIGN BOOK [JAN 2011]
forth in this document are intended to serve to further inform the City’s The Dover Transit Center Neighborhood Plan and Design Book
efforts to plan for improving alternative transportation in Central Dover. provided the City of Dover with a design and planning strategy to guide
development around the new Dover Transit Center and to improve
> CITY OF DOVER CDBG ACTION PLAN transportation infrastructure in Central Dover. The planning area
Since the City of Dover became an entitlement community to receive included a portion of the Restoring Central Dover boundary south of
CDBG funding in 1995 to present, there has always been an emphasis Loockerman to South Street. The plan was focused primarily on long-
in the city’s annual plan to address the needs in the Downtown Target term physical development scenarios and is considered an important
Area. The top priorities that were determined by the stakeholders companion piece to Restoring Central Dover, which is centered on
in the community were: housing needs, infrastructure needs, public what needs to happen in the short term in order to position Central
service needs, homeless needs and public facility needs. As a result of Dover for longer-term investment and positive change.
the needs determined in the city by the stakeholders, several homes
RESTORING CENTRAL DOVER IN CONTEXT 3
Page 214
The Dover Community Partnership PLANNING PROCESS
The planning process was designed to be both data-driven and people-
driven. This required us to both:
LISTEN through a variety of Community Outreach & Engagement
activities—a key component of the plan and the basis for the
THE DOVER COMMUNITY PARTNERSHIP recommendations
REVITALIZATION PLAN
JANUARY, 2009
COLLECT & ANALYZE DATA to provide a comprehensive
picture of the challenges Central Dover faces today.
> DOVER COMMUNITY PARTNERSHIP REVITALIZATION COMMUNITY OUTREACH AND ENGAGEMENT
PLAN [JAN 2009] Restoring Central Dover: Our Vision for Vitality was conceived as a
The Dover Housing Authority formed the Dover Community true, community-driven plan that will serve as a unified voice for local
Partnership in 2003 to address concentrated poverty and housing residents, business owners, institutions, youth, community leaders, and
issues. The general consensus was that the homeownership rate political representatives, among others. As such, the planning process was
and economic opportunities in the area were poor and an initiative designed to not only engage the public, but also help to build a sense of
was needed to address the issues. The resulting Dover Community community among the area’s diverse constituency.
Partnership Revitalization Plan [covering a 20-block area now within
the Restoring Central Dover boundary and comprising about 12% of To create a plan grounded in the realities of Central Dover requires an
this effort’s planning area] set forth a set of strategies geared toward: open and ongoing public dialog. The process informed and brainstormed
with residents and stakeholders using a range of outreach tools including:
- Creating a safe environment for current and future residents to
live, work, and play. Monthly Steering Committee meetings conducted throughout the
- Providing a range of housing opportunities that address the process brought together to guide all aspects of the project. The Steering
needs of the homeless to homeowners. Special care will be Committee is comprised of local residents, community leaders, elected
taken to ensure that housing initiatives do not displace current officials, and representatives from local institutions.
residents but instead enhance their living conditions.
- Supporting the efforts of the Downtown Dover Partnership to Ten confidential one-on-one interviews with a sample of residents,
promote the public welfare of the residents of the City of Dover community leaders, business owners, service providers, and City officials.
via the development of the economic, cultural and historic
resources of the downtown area. Three focus groups to discuss unique concerns and perspectives
regarding the future of Central Dover. The focus groups brought together
These objectives were considered a jumping off point for Restoring Central leaders of the faith-based community, social service providers, and
Dover, the outcomes of which harmonize well with this previous effort. The representatives of the business community to discuss their perspectives
overlap in leadership between the Dover Community Partnership and the and ideas for Central Dover.
Restoring Central Dover steering committee, as well as the synergies
between the two efforts, should capitalize on opportunities to collaborate An interactive open house to publicly launch the plan and invite
in bringing needed resources to the Central Dover community. community members into provide their opinions on the community. At the
beginning of May 2014, the open house utilized the 1st floor community
room of Bayard Plaza on Loockerman and was open seven times over
4 RESTORING CENTRAL DOVER
Page 215
the course of nine days. The planning team created temporary window
installations on both sides of Loockerman to draw attention to the open
house and filled the interior with information, a photo suggestion booth
and other exercises designed to get residents thinking creatively. At least
177 residents participated in this event. The input provided by residents at
the open house led to many of the strategies in this plan.
A number of collaborative maps were used to help residents pinpoint
specifically where they had concerns about their community. A large-scale
collaborative map was used in the Open House that asked residents to
identify mode-specific transportation issues. Residents were also engaged
in public realm mapping to identify hotspots for crime, illegal dumping, poor
lighting and flooding.
A “do-it-yourself” budget exercise at the open house allowed
participants to allocate play money in multiple denominations to piggy
banks representing general budget categories, such as “transportation
networks” and “housing and neighborhoods.”
Community members wrote their big ideas for Central Dover on a dry erase
board, which they posed next to for a snapshot in the “photo suggestion
booth” at the open house.
A resident perception survey to collect the perceptions and concerns
of residents across all of the Central Dover neighborhoods. Community
volunteers that administered the survey received 224 completed surveys
representing 18% of households in Central Dover.
Following the open house, a final public meeting was held in July
2014 to allow the community to review preliminary recommendations and
participate in an exercise designed to set priorities among the range of
ideas presented to determine where limited funds and resources should
be directed.
RESTORING CENTRAL DOVER IN CONTEXT 5
Page 216
PUTTING THE PLAN TOGETHER
To understand the underlying trends and socio-economic characteristics of
Central Dover, the planning team utilized The Reinvestment Fund’s [TRF]
Policy Map data sets. This data on population, race, income, housing and
other aspects of the community was augmented where necessary with
other US Census information, parcel data provided by the City of Dover,
Dover Police Department crime data, and other datasets.
In addition to the base data described above, the planning team conducted
a parcel by parcel survey of every property in the Central Dover study
area. The survey collected detailed information on each property, including
land use and condition but also recorded physical observations regarding
housing, businesses, parks, roads, maintenance, safety , and so on.
The planning process consisted of three phases:
1. RESEARCH & EXISTING CONDITIONS
During the first phase of work, which was defined by research and data
collection, the planning team explored and documented the physical and
economic conditions in Central Dover through:
> A GIS parcel by parcel mapping of land use, building condition and
vacancy data to create an up-to-date land use map
> An in-depth examination of the physical environment to assess
the existing commercial and retail mix, the quality of the natural
environment, local traffic and circulation patterns, the transit system,
and pedestrian / bicycling amenities
> Research using Policy Map and the Census to evaluate demographic
and socioeconomic changes within the community over time
> A review of existing planning documents whose boundaries overlap
with those of the study area
> The launch of a public outreach initiative beginning with the door-to-
door resident survey and followed by the public open house designed
to get a handle on the qualitative aspects of the neighborhood
> The facilitated discussion of specific concerns raised during the
process to date over a series of three focus groups
> A series of one-on-one interviews to review our work and discuss
possible solutions with key stakeholders and funders
> Processing the information collected during the analysis to identify
opportunities and challenges for the future of Central Dover
> Review of this information by the Steering Committee 02 Land use survey map and breakdown
Existing land use was one of the data points collected during the parcel-by-parcel physical
survey conducted during Phase I of Restoring Central Dover.
SOURCE: Field survey, Nov 2013 - Jan 2014
6 RESTORING CENTRAL DOVER
Page 217
2. PRELIMINARY RECOMMENDATIONS 3. FINAL MASTER PLAN
During the second phase of the process, the planning team worked closely During the third phase of work, the planning team refined the
with community partners to develop well-tailored recommendations in recommendations, incorporating the input collected from members of
response to the research findings and community input collected in Phase the Steering Committee and the general public at the end of Phase II.
I. Phase II resulted in: The analysis and revised recommendations are packaged together in this
report, along with an implementation strategy to guide the next steps in
> A list of goals and objectives based upon public input coming weeks, months, and years.
> A series of preliminary recommendations for achieving such goals and
balancing observed trends and projections with desired outcomes The Central Dover area, its network of involved neighborhood institutions
> Presenting the preliminary recommendations to the community for and leaders, and all interested community members will assume
feedback and critique at a public meeting, along with a prioritizing responsibility for the revitalization plan, its acceptance by the City of Dover,
exercise and its implementation.
RESTORING CENTRAL DOVER IN CONTEXT 7
Page 218
03 Central Dover landmarks
SOURCE: Field survey, Nov 2013 - Jan 2014
8 RESTORING CENTRAL DOVER
Page 219
A SNAPSHOT OF CENTRAL DOVER
WELCOME TO CENTRAL DOVER and below average building conditions [E]. This area has been targeted
by the city in recent years to bring housing up to code and demolish
Dover, the capital city of the first state, is centered on the area referred
hazardous structures.
to as Central Dover, comprised of a number of distinct areas clustered
around the historic Loockerman Street commercial corridor. Let’s start off
The Norfolk Southern rail line divides the Dover Housing Authority’s Simon
by getting our bearings in Central Dover:
Circle neighborhood and surrounding primarily residential streets to the
west.
Loockerman, once a thriving traditional main street [A], is anchored
by Dover City Hall and the Dover Library on the east end and a recent
The Green, a historic park located in the old downtown Dover area, was
commercial development at the west end, where Loockerman connects to
during colonial times a center of civic life and activity, and is now used for
Route 8 (an important gateway to Central Dover) via Forrest Street. The
large scale events. 79 historic buildings contribute to the Dover Green
corridor features primarily two and three-story historic buildings [B], some
Historic District—many of these buildings are now being used for law,
with active ground floor commercial uses, but some with vacant storefronts.
finance, and other professional offices [F].
The Wesley College campus [C], which serves about 2,500 students, is
The Southern portion of the study area is defined by a number of large
located just north of the Loockerman corridor. The campus is surrounded
footprint public, government and medical uses such as Bayhealth [G], as
by residential blocks featuring larger houses (some which have been
well as senior housing and commercial offices. The block structure results
converted to office uses) with predominantly well maintained historic
in a much looser urban fabric, in contrast to the more pedestrian-friendly
architecture [D].
scale found north of Loockerman. This area is a significant center of
employment in Dover, but feels physically disconnected from Loockerman
Just north of Loockerman between Governors Avenue and West Street lay
and adjacent neighborhoods.
a few blocks of distressed residential streets with concentrated vacancy
[A] [B] [C] [D] [E] [F] [G]
RESTORING CENTRAL DOVER IN CONTEXT 9
Page 220
EXISTING CONDITIONS TAKE-AWAYS
The analysis of existing conditions conducted in Phase I of Restoring relative to the rates in other areas in the City and County. As long-term
Central Dover led to some important conclusions that formed the basis, vitality relies on short-term stabilization of deteriorated blocks, strategies
along with community input, for the drafting of recommendations. The to retain existing residents as well as attract new neighbors
broad stroke highlights of the opportunities and challenges among these should be a priority of Restoring Central Dover.
follow, with additional more specific references to the analysis threaded
through the recommendations chapter. The existing conditions appendix VACANCY
includes any remaining elements of research and public input not included There has been comparatively modest population growth and vacancy
elsewhere in the document. remains a challenge in Central Dover. As an overall percentage of
parcel area, vacant land and buildings comprise 13% of Central Dover.
POPULATION DYNAMICS IN CONTEXT The aggregated area of vacant land in Central Dover is equal to 25
Central Dover is predominantly African American (59%), with the number football fields. The effects of vacancy impact perception and can hinder
of African American residents increasing by 6% between 2000 and 2010. reinvestment, especially when concentrated on individual blocks [Fig 05].
The 12% increase in population overall in Central Dover [Fig 04] is on par At the same time, these clusters of vacancy are also opportunities for
with the City of Dover’s 14% increase; but the population of Kent County infill development.
increased 28% over the same period, far outpacing local growth. The
rate of population growth in the Central Dover area continues to decline
04 Change in population and racial breakdown, 2000-2010 05 Map of vacant land and buildings
SOURCE: 2000 & 2010 US Census SOURCE: Field survey, Nov 2013 - Jan 2014
10 RESTORING CENTRAL DOVER
Page 221
BUILDING CONDITIONS
The parcel survey included rating buildings on a scale according to their
apparent condition as observed from the street, with an “A” rating given to
buildings in “Excellent” condition, through an “F” rating given to buildings
in “Very Poor” condition [Fig 07]. Some patterns emerge in concentrations
of buildings in below average condition relative to the study area overall
[Fig 06], which coincide with concentrations of vacant buildings and land.
These distressed residential streets speak to the need not only for infill
development, but targeted home repair assistance to preserve
exisiting housing stock where possible.
COMMERCIAL SERVICES
Though the land use survey counted a number of commerical uses in the
study area, most of them are concentrated in the southern end of the study
area and are offices and other commercial typologies that don’t serve the
daily needs of Central Dover’s residents. Local residents typically travel
outside of Central Dover to more suburban/auto-oriented commercial
developments situated along Route 13 or Route 8. For existing residents
without a car, this is a significant distance to travel to access services and
goods or retail jobs.
The Loockerman commercial corridor is an opportunity to bring
commercial services within walking distance of Central Dover
residential neighborhoods,. However, the challenges to overcome in
06 Surveyed building conditions
It should be noted that because the building condition survey typically relies on judgments based only on
revitalizing the corridor include perception of safety, high vacancy what is visible from the street, it is fair to say that the survey results overestimate the condition of buildings,
as defects on the sides and rears of buildings are often not visible.
SOURCE: Field survey, Nov 2013 - Jan 2014
Bayard Plaza, a recent mixed use development on Loockerman Street
07 Building condition ratings criteria
SOURCE: Field survey, Nov 2013 - Jan 2014
RESTORING CENTRAL DOVER IN CONTEXT 11
Page 222
and tenant turnover rates, and a lack of readily leasable spaces due to 08], compared to one in three families with single female householders
deferred maintenance and lack of property owner resources to rehabilitate city-wide. Many Central Dover residents face considerable housing cost
properties. burdens, with a significant portion of the study area showing 81% or more
of renters paying more than 30% of their income towards gross rent [Fig
Capitalizing on housing development opportunities on or within walking 09]. The preservation of and increased access to affordable
distance of Loockerman would help change perception of this struggling housing will be key to providing housing opportunities to Central Dover
commercial corridor, as well as bring a denser customer base to support residents.
commercial revitalization. Recent developments along Loockerman, such
as the large new office building at the west Loockerman gateway, the mixed Add to those factors a high unemployment rate [10% in 2010] and lower
use development at Bayard Plaza, and the recruitment of The Delaware educational attainment levels, and it becomes clear that many members of
EZ-Pass Customer Service Center and Division of Motor Vehicles Call the Central Dover community face a number of challenges that will require
Center, can be leveraged to continue to build momentum and critical the continued expansion of local services to meet the needs of
mass along Loockerman. of residents.
SOCIOECONOMIC CHALLENGES
Some Central Dover residents have faced disadvantages in life that have
placed them at the margins. The area’s weighted average median income,
$34,730 is 27% lower than the City of Dover’s $47,754. More than half of
families in Central Dover are headed by a single female householder [Fig
08 Household characteristics 09 Household characteristics
The concentrated college student population is classified in the “non-family” group by the Percent of renter households for whom gross rent is 30% or more of household income.
Census, which likely explains why the non-family share in Central Dover is 11% higher Gross rent is the contract rent plus the estimated average monthly cost of utilities.
than that of the City of Dover. The rate of 53% of families being headed by single female SOURCE: American Community Survey, 2007-2011
householders refers only to the 47% of households that are considered a “family” and
does not include students.
SOURCE: 2010 US Census
12 RESTORING CENTRAL DOVER
Page 223
CRIME AND PERCEPTION OF SAFETY
One of the most prominent major quality of life issues that arose in
community discussions during the Restoring Central Dover process—and
one that impacts efforts to retain residents and businesses as well as
attract new ones—was crime and perception of safety. When asked what
they liked least about Central Dover, 42% of resident survey participants
identified “Safety in the community,” which received the greatest number of
“least liked” responses by a margin of 12%.
Crime data from the Dover Police Department shows that the number
of violent crimes per 1,000 persons in the Central Dover area rose from
6.16 per person in 2011, to 22.76 per person in 2013, a nearly 400%
increase over a three year period [Fig 10]. In 2013 alone, nearly all forms
of reported crimes in the plan were 3- to 5-times that of Dover overall [Fig
11]. These figures were alarming to the Central Dover community and plan
leadership, and indicates a clear need to bring more resources to ensure
the safety of the Central Dover community.
10 Change in violent crime rates, 2011-2013
SOURCE: Field survey, Nov 2013 - Jan 2014
11 2013 Crime rate breakdown: Central Dover and City-wide
SOURCE: Field survey, Nov 2013 - Jan 2014
RESTORING CENTRAL DOVER IN CONTEXT 13
Page 224
OUR VISION FOR VITALITY
This plan represents our community’s vision for restoring
the vitality of Central Dover. It offers a range of achievable
strategies, implemented over a five year period,
designed to lay the foundation for future opportunities
to fully realize Central Dover’s potential as a place to
live, work, and play.
GOAL AREAS
A range of strategies towards achieving our vision for vitality are organized in three goal areas designed to achieve:
1. A STRONG COMMUNITY
2. POSITIVE DEVELOPMENT
3. AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE
14 RESTORING CENTRAL DOVER
Page 225
PLAN
RECOMMENDATIONS
OUR VISION FOR VITALITY
I. A STRONG COMMUNITY 15
Page 226
16 RESTORING CENTRAL DOVER
Page 227
1
A STRONG COMMUNITY
Page 228
18 RESTORING CENTRAL DOVER
Page 229
BUILD COMMUNITY CAPITAL
Community support is critical to implementing the goals of this plan. Working to strengthen community
cohesion through the cultivation of neighborhood groups will not only provide spaces for residents to
enjoy each other’s company as well as address issues collectively; it will also encourage them to root
themselves in Central Dover, as well as attract new residents looking for a deeper sense of community.
ESTABLISH RESIDENT-LED CIVIC GROUPS
In order to effect change in their community, residents have to work
together. This means collectively developing an organizational model of
neighborhood representation and community stewardship. By developing
neighborhood groups, those wishing to take part in helping restore Central
Dover will be better able to pursue resources to improve their neighborhood,
create necessary dialogue about ways forward, and develop programming
focused on engaging residents in the pursuit of positive change for their
community.
The resident survey led by the Central Dover Steering Committee asked
neighbors how likely they think other people in the community would
provide assistance in a variety of situations [Fig 12]. Roughly half of the
responses indicated that Central Dover residents don’t necessarily feel they
can rely on their neighbors. There is an opportunity to improve the bonds
between neighbors, which could be fostered by individual involvement in
neighborhood groups and resident-led initiatives.
In Central Dover, there are a number of churches and religious institutions
who currently conduct a number of outreach services; and these 12 Resident expectation of assistance from neighbors
For a variety of hypothetical situations, surveyees generally felt they would likely receive
institutions could be helpful in initiating the establishment of neighborhood help from a neighbor half the time.
groups in Central Dover. Utilizing this religious network will also help lay SOURCE: NeighborWorks resident survey
the groundwork for a collaborative set of neighborhood groups, working
toward similar aims, as well as provide facilities in the interim while these
grassroots groups get off the ground. area to determine what established networks can be built on. Existing
neighborhood boundaries or affinity areas, such as Lincoln Park, Simon
As a first step, develop a list of local neighborhood leaders that will help Circle, Kirkwood/Queen/New Streets, and so on, can serve as jumping
to organize and map out existing groups in and adjacent to the plan off points for structuring neighborhood group facilitation and organization.
I. A STRONG COMMUNITY 19
Page 230
DEVELOP COMMUNITY BUILDING the campus and most visible to the general community so as to build
excitement and encourage others to want to participate. Such projects
PARTNERSHIP WITH ANCHOR INSTITUTIONS could include targeted beautification projects on residential blocks,
Historically, Wesley College has been a good neighbor engaged with the garden tours, and public recognitions of particularly well-presented
community and it is a goal of this effort to see that continue. Community flower and produce gardens and exterior home renovations. These
engagement is an area of focus of the college’s strategic planning process activities would serve as initial steps for creating and sustaining model
currently underway. There may be some short-term and longer-term blocks throughout Central Dover.
opportunities to connect Wesley with the Restoring Central Dover plan
implementation. Local partners can begin laying the groundwork for and Use experiences with Wesley to open up communication channels of with
opening formal channels of communication between the Wesley College other anchor institutions located in or serving Central Dover to recruit
administration, other anchor institutions, and community residents to workers from Central Dover. These companies include but are not limited
connect and work on common issues affecting Central Dover. Determine to: Bayhealth, Energizer, Playtex , Kraft, the State of Delaware, other area
where existing resources are available and where new ones are needed colleges and universities (DelTech and Del State), and public schools
to address community building priorities that emerged from the Restoring serving the community. In addition to exploring workforce development
Central Dover Plan, including: opportunities, the conversations with managers of these businesses
should explore, among other objectives, student internships, summer youth
> Encourage community residents and Wesley College students employment, career exploration and vocational programs, and work-study
to become “We Care” team members as part of the proposed and scholarships.
Neighborhood Watch Network to enhance safety and security on
a block-by-block basis. Partnerships with local anchor institutions Coordinate and align these activities with the public schools and the new
could also be helpful in cultivating neighborhood watch groups and community centers under construction and where the programming is
coordinating communication between campus security, Dover Police already underway.
Department patrols, and neighborhood watch activities.
> Provide more opportunities for residents to engage with one another
CREATE ANNUAL “CELEBRATING CENTRAL
in social and cultural settings, informal and formal.
> Build effective working relationships among neighbors to address DOVER” BLOCK PARTY
safety and maintenance issues at the block level. Central Dover is perceived by some as a section of the city that should be,
> Educational, vocational, and mentoring programs for children and for the most part, avoided by those from outside. However, when Central
youth working with the schools serving the neighborhood and parents Dover residents were asked how likely they would be to recommend the
of those students. community as a good place to live, 67% stated they would recommend it.
> Community improvement projects focused initially in areas closest to This highlights a disparity between outside perception of Central Dover,
and the view of those living in the neighborhood. If not addressed, this
could inhibit reinvestment and revitalization efforts. While efforts should
be made to continue and build on the existing events such as First Fridays
and the farmer’s market on the Plaza to bring people downtown, one way
to improve the view of those living outside Central Dover would be to host
an annual celebratory block party showcasing the very best Central Dover
has to offer.
With an annual block party, residents could show what they love so much
about living in here. There are opportunities to hold talent shows, market
wares made by the community’s ambitious makers and entrepreneurs,
20 RESTORING CENTRAL DOVER
Page 231
allow businesses and social services agencies to talk to residents about
what they offer, and so on. Organizers could consider a multiple-location
event to encourage unity across different neighborhoods within Central
Dover.
EXPAND ON “COMMUNITY CLEAN-UP DAYS”
In recent years, the Dover Housing Authority, Central Delaware Habitat
for Humanity, Wesley College, the Office of Senator Carper, and the City
of Dover have organized a “123 = ABC” Community Event. During this
event, 500 incoming students, along with faculty, staff, student athletes,
and community members, have worked to improve the curb appeal
and streetscape”of 20 blocks situated within the City of Dover/Carper
Homeownership Program Target Area (bounded by Loockerman, West,
Mary, and Governors). Volunteers clean the blocks of trash, plant flowers
and shrubbery, and paint curbs. However, resources are not currently
available to continue this effort. Wesley and local partners should engage
in coordination efforts to resume this event, which could help kick start
similar projects led by residents. Recently formed neighborhood groups
and established church groups could hold similar events monthly, with the
help of sponsors who support the 123=ABC event.
DEVELOP AND DISTRIBUTE COMMUNITY
CALENDAR OF ACTIVITIES AND EVENTS
Produce a regularly updated and distributed listing of information/events/
activities in Central Dover to keep the community informed of what’s going
on in Central Dover in general and, in particular, to highlight efforts towards 13 Community-identified illegal dumping/trash hot spots
achieving the goals of Restoring Central Dover. The updates could be SOURCE: Public open house input
coordinated with local press, distributed through mass email to subscribers,
and have a constant presence online and through social media.
EVALUATE LEVEL OF ACCESS TO COMMUNITY
FACILITIES FOR SERVICES
Two community facilities—Inner City Cultural League’s cultural arts center
and Solid Rock Baptist Church’s community center—are presently under
construction to provide a variety of services to Central Dover. Following the
establishment of these new facilities, the City and local partners should
evaluate Central Dover’s inventory of community facilities and access to
social services to determine whether there is need for additional facilities
to improve access within the community to these important services.
I. A STRONG COMMUNITY 21
Page 232
14 Aspects of Central Dover least liked by residents
Residents identified crime and safety as the least liked aspect of living in Central Dover.
SOURCE: Neighborworks resident survey
22 RESTORING CENTRAL DOVER
Page 233
INCREASE PUBLIC SAFETY
Developing a collaborative/community policing strategy which makes an at-risk community safe is
imperative for any neighborhood revitalization initiative. Without a viable plan for reducing crime, attempts
to attract investment, businesses, and new residents can be inhibited or even rendered impossible. For a
neighborhood like Central Dover, reducing illicit activities in the area will greatly improve quality of life
for current residents and improve efforts to attract potential developers,
businesses and new residents.
As it stands, both residents and visitors have the perception that Central
Dover has a serious crime issue. According the resident survey, 42%
said crime and safety issues are what they liked least about living in the
community [Fig 15]. This sense of Central Dover being a high crime area
is also backed by Dover Police Department crime data, indicating that
the plan area has the largest concentrations of crime and illicit behavior
citywide and that concentration has intensified by almost 400% from 2011
to 2013 [Fig 10 and 11]. In short, Central Dover is an area in dire need
of innovative community-oriented approaches to crime prevention. What
follows are a series of recommendations that can help begin reducing
criminal activity and help develop better communication between the 15 Resident support for a neighborhood watch program
community and public safety officials. SOURCE: NeighborWorks resident survey
ESTABLISH COLLABORATIVE/COMMUNITY and improve safety in Central Dover. Residents in the plan areas
are ready to take an active role in helping restore safe conditions
POLICING throughout the neighborhood. A number of current residents believe
Building a stronger relationship between the Dover Police Department establishing a neighborhood watch could deter criminal behavior.
and the residents of Central Dover will go a long way in helping improve 60% of all resident surveyees would like to see a neighborhood
public safety. Relationship-building can be aided by creating opportunities watch formed in Central Dover; and 42% of those respondents would
for the community to not just report criminal activity taking place in the volunteer if it is created. With the help of the Dover Police Department
community; but to take part in the decision-making in regards to the type as well as local institutions and church groups, organizers could begin
of community policing initiated in the neighborhood. recruiting members for neighborhood watch groups, and educate
members as to the role the neighborhood watch should play; how
> CREATE NEIGHBORHOOD WATCH NETWORK best to communicate with the police department; what neighborhood-
With residents using their relationships to hold each other accountable, specific crime patterns to look out for; and how to patrol the streets
neighborhood watch programs have great potential to prevent crime safely.
I. A STRONG COMMUNITY 23
Page 234
> FORM A CITIZEN ADVISORY COMMITTEE
Creating a citizen advisory committee will establish that the Dover
Police Department is deeply committed to addressing the concerns
of the community, and is open to hearing its ideas in regards to how
it could adjust policing practices and procedure. Selecting a set of
community leaders to review issues will help bring more residents
forward to participate in collaborative efforts to help diminish crime
in the plan area. Creating more dialogue between the community
and police will also serve to educate residents and police alike about
the community, improve awareness of policing and crime prevention
procedures, and build mutual trust, among other benefits.
DEPLOY POLICE FOOT AND BIKE PATROLS
Foot and bike patrols are not only recognized as great methods to deploy
officers through a neighborhood to prevent crime; they also provide
opportunities for officers to build relationships with residents and business
owners, which enables information sharing that also supports crime
prevention. The Dover Police Department has conducted foot patrols
along Loockerman Street in the past, but these were eliminated due to
the budget constraints incurred due to the recent economic downturn and
dwindling federal and state funding. However, residents and local business
owners are calling for a re-establishment of the foot patrols to reduce
loitering along Loockerman and drug activity in the Queen/New Street
portion of plan area.
Officers would be encouraged to check in to each business, and record
16 Known and perceived crime hotspots their visit in a ledger retained by each business owner—a technique used
At the public open house, community members identified locations in Central Dover they by some other commercial corridor foot patrons to support face-to-face
see as hotspots for crime and illicit behavior [shown in orange dots above]. For the most engagement between police and businesses. Community members also
part, perceived hotspots coincide with Dover Police Department crime data hotspots strongly support the establishment of bike patrols along streets identified
[generalized and shown in darker areas above]. Perception of high crime rates at The
Green and Simon Circle are not necessarily reinforced by reported crime incidents, which as high drug and illicit activity areas in the Central Dover area.
could be a factor of lack of crime reporting or simply a perception issue.
SOURCE: Dover Police Department & public open house input
EXPAND SURVEILLANCE CAMERA NETWORK
Since the onset of the economic downturn, police departments around the
country have had to expand their capacity with fewer resources to support
As a first step, the Restoring Central Dover Steering Committee them. In order to address this issue, the Dover Police Department worked
will meet with Dover Police to discuss an implementation strategy, with Advantech, a security camera firm based in Dover, Delaware, to put
including mapping out existing neighborhood watch areas in or in place a 24-hour surveillance platform operating primarily in downtown
adjacent to the plan area and determining whether existing adjacent Dover. The police department can now monitor crimes as they take place,
watch areas could be expanded to include Central Dover or if new and relay real-time information to responding officers about the occurring
groups should be established. incidents.
24 RESTORING CENTRAL DOVER
Page 235
Department officials report that this has greatly improved capacity to fight
crime and they are looking to expand the surveillance camera network
to other sections of the city. Currently, the department has a plan to add
21 cameras throughout the city and better integrate the existing camera
network into an improved single-user interface located at the Dover Police
Departments Dispatch Center. Working with both the City of Dover and the
police department to secure more funding for the network expansion will
improve public safety in Central Dover.
IMPROVE LIGHTING IN TARGETED AREAS
Public safety can be greatly improved by the installation of better lighting
in areas known for high criminal activity. Pedestrian-scale lighting along
commercial corridors and throughout residential areas can enhance traffic
for businesses and increase the number of residents willing to walk at
night through their neighborhoods; while simultaneously deterring illicit
activity.
During the planning process, residents expressed concern about the lack
of proper lighting and its connection to criminal activity and vagrancy. Areas
identified by residents in serious need of more lighting were Simon Circle,
Wesley College, the New/Queen Street section, and portions of South
State Street [Fig 17]. Other areas where extra lighting could improve the
pedestrian and cycling experience would be along the southern portion of
Forest Street to Loockerman, and all of Division Street.
> CREATE RESIDENT-ASSISTED PORCH/FAÇADE 17 Community-identified areas in need of improved lighting
SOURCE: Public open house input
LIGHTING PROGRAM
Installing low-cost porch/façade lighting in areas with high
concentrations of illicit activity will reduce crime and increase safety
for neighborhood residents. Identifying funding sources would be UC BRITE PROGRAM
the first step in developing a program which will assist residents with The UC BRITE program provided matching funds for property owners
the purchase of motion-detecting or solar power lighting that can be around the University of Pennsylvania in Philadelphia to purchase
affixed to their porches or business façades. and install exterior lighting. The popular program offered assistance
to 114 property owners on 58 blocks in the University City area,
contributing to a significant improvement in street lighting. The program
> INSTALL PEDESTRIAN-SCALE LIGHTING was started in the late 1990s as a collaboration between the energy
The typical cobra-style street lamps seen posted along main company and the University of Pennsylvania to improve safety in the
thoroughfares in the plan area do not provide sufficient lighting to neighborhood, and later handed over to the University City District [UCD].
deter illegal behavior or enhance the streetscape. Installing pedestrian- Following the success of UC BRITE, in 2009 UCD installed 71 pedestrian lights
scale street lighting will better illuminate walkways and public spaces on Baltimore Avenue from 45th to 50th Streets and the University launched
while eliminating the gaps between lit areas. a Neighborhood Lighting Initiative to partner with landlords to install new
pedestrian lights between Walnut and Spruce and 40th and 43rd Streets.
I. A STRONG COMMUNITY 25
Page 236
18 Community do-it-yourself budget results
SOURCE: Public open house input
26 RESTORING CENTRAL DOVER
Page 237
ENGAGE YOUTH IN COMMUNITY
Finding ways to involve youth in the revitalization and stewardship of Central Dover will not only provide
activities for young people to take part in or simply provide employment opportunities; this will help
reinforce the need for their active participation in shaping their community and keep them accountable
to sustaining it and protecting Central Dover’s vitality.
Though youth of ages 17 and under make up only 15% of the Central SUSTAIN AND EXPAND YOUTH
Dover population, this figure belies the actual density of youth living in
Central Dover compared to the City of Dover. The share of minors is
PROGRAMMING
skewed by the density of the college student population aged 18 to 24, Involve local elementary and middle schools and the Capital School
which comprises 32% of Central Dover’s population. However, there are District, along with youth activity service providers, to comprehensively
over 1,000 residents under 18 per square mile living in Central Dover, review after school programming and GED classes available to Central
which is much more concentrated than the city-wide youth density figure, Dover’s children and youth to determine where there might be areas of
330 residents under 18 per square mile. Though the youth population is improvement. In the near term, steps should be taken to ensure that youth
concentrated here, there are very limited opportunities and spaces readily programming continues at Simon Circle after the Boys & Girls Club leaves
accessible to them, and many residents expressed concern about how this the facility. Local partners should approach other youth-oriented nonprofits
could push neighborhood youth to engaging in negative behaviors. to determine whether they have the capacity and resources to fill the gap.
Feedback heard during the planning process indicated that there is a
The residents of Central Dover want more opportunities available to their specific need for services addressing the needs of youth aging out of
youth; the neighborhood youth deserve a chance to grow and thrive. This foster care, including housing.
was evident during the “do-it-yourself” budget community engagement
exercise held at the public open house in May 2014. Participants were RE-ESTABLISH POLICE ATHLETIC LEAGUE
being asked how they would distribute budget resources for City of
Dover amongst nine different programmatic categories. Out of the nine Building relationships between local police and neighborhood youth
categories, “Youth Programs & Education” ranked as the top priority [Fig through friendly sports competition is an approach to crime prevention and
18]. Also, throughout numerous interviews and stakeholder focus groups, community building that could have a great impact on the levels of illicit
many asserted the need for more youth-oriented programming and activity taking place in Central Dover. Re-establishing the Police Athletic
services. Therefore, engaging youth has to become an integral component League in Central Dover in partnership with Delaware State University
of plan implementation. (who will provide the necessary recreational space), will begin the process
of bridging the gap in a positive way between officers and kids in the
Ensuring youth have safe and positive ways to learn, socialize, and stay community.
healthy will help prepare them for a productive adulthood and strengthen
the community as a whole. The following efforts should be pursued, among
others, to support and expand youth programming in Central Dover.
I. A STRONG COMMUNITY 27
Page 238
CREATE YOUTH OUTREACH AND
EDUCATIONAL SUPPORT CENTER
A number of residents are concerned about the lack of readily-accessible
spaces or facilities where youth can congregate and take part in positive
activities. To remedy this, Solid Rock Baptist Church plans to open a
4,200-square-foot Community Outreach Center on West Street. The
center will offer recreational programs, as well as classrooms featuring
advanced technology that tutors will utilize to provide a different and
enhanced learning experience for youth. The new outreach center is
scheduled to open in 2015.
PROVIDE COMMUNITY DEVELOPMENT
VOCATIONAL OPPORTUNITIES FOR YOUTH
The experience of taking an active role in neighborhood revitalization can
have immeasurable impact on a young person’s sense of both self and
purpose. Helping rehabilitate housing, as well as reclaiming vacant lots and
transforming them into pocket parks, teaches youth transferrable skills and
shows them the importance of investing energy in their community.
YOUTHBUILD USA
YouthBuild USA is one example of a program that
seeks to merge community development work
with vocational training for at-risk youth. Eligible
students learn building construction skills and
the process of thorough on-site training while
working to complete their high school studies.
Currently, there are 264 YouthBuild programs
across the country engaging approximately
10,000 young adults per year; and since
1994, over 120,000 YouthBuild students have
built over 22,000 units of affordable housing.
28 RESTORING CENTRAL DOVER
Page 239
EXPAND ADULT AND FAMILY SERVICES
Restoring Central Dover must include strengthening support for residents who live on the margins by
providing opportunities for them to actively pursue improving their employment situations. According to
the American Community Survey, approximately 46% of Central Dover residents earn less than $30,000
annually.
Working to reduce barriers of entry inhibiting access to the formal economy
as well as providing vocational education opportunities can improve the
living conditions of struggling individuals and families, as well as cultivate
deeper trust between the neighborhood residents and the social service
agencies identifying them as constituents.
STRENGTHEN AND EXPAND TRANSITIONAL
HOUSING AND RELATED SERVICES
Establish and strengthen networking and coordination of housing and
family support services among all local providers. This strengthened
communication will facilitate broader access to information on available
services and eligibility requirements through different media, including
informed word-of-mouth, print and broadcast advertising and promotion,
and computer/web-based/smart phone technologies.
It is critical to support emerging service centers, such as Dover Interfaith
Mission for Housing, to help program the space and ensure full access to
services by residents. Link community residents to educational, employment
and financial services that support their healthy growth.
Additional transitional housing units in the Central Dover area should
avoid geographic concentration, integrate appropriate programming and
services targeting children and families, and seek a variety of housing
types designed for families of all sizes. 19 Change in median household income
SOURCE: 2000 U.S. Census, American Community Survey, 2007 - 2011
I. A STRONG COMMUNITY 29
Page 240
ESTABLISH A FAMILY SERVICES responsibilities for ensuring quality services and service delivery.
> Host community fairs and partner with churches to get the word out
COLLABORATIVE about existing and new services
Establish a formal Family Services Collaborative comprised of the providers > Sponsor and facilitate continuing education classes and life skills
representing social/human service agencies and programs serving training, especially to enhance life-long learning and skill development
Central Dover. The central goal of the collaborative should be to enhance abilities of residents previously incarcerated.
communications and coordination among community service providers in > Create more opportunities for peer-to-peer learning through which
order to better connect Central Dover residents to available services. The parents, caregivers, and enablers coordinate the support of childhood,
services collaborative would: youth and family development.
> Link and advertise their services and eliminate any gaps in scope
EXPAND FINANCIAL EDUCATION SERVICES
and delivery. (Note: the existing 2-1-1 service provides information
about available services; however, more advertising of these services Involve local financial institutions such as NCALL in providing educational
is needed to get the word out.) resources and training for Central Dover residents in the areas of financial
> Promote their services, eligibility, performance and outcomes to management and credit repair, housing counseling and financial coaching
residents services, tax preparation, and savings programs such as Individual
> Assess program outcomes and impacts, and use those findings to Development Accounts.
advocate for resources to fill any existing gaps.
> As an intermediate term strategy where service gaps exist locally,
provide transportation options for Central Dover residents to access
services outside the area.
> Facilitate networking and collaborations among neighborhood
service providers to: better coordinate inter-agency services and
service delivery; support one another in identifying, competing for and
securing capital to finance their programs; and facilitate interagency
collection of program data, tracking of performance and measurement
of outcomes over time.
> Sponsor and hold inter-organizational meetings to discuss roles and
WEST PHILADELPHIA SKILLS INITIATIVE
The West Philadelphia Skills Initiative [WPSI] provides workforce development for both youth and adults throughout
the University City District. Employers include the Children’s Hospital Of Philadelphia, Drexel University, Mercy
Philadelphia Hospital, the National Board of Medical Examiners, Penn Medicine, the University of the Sciences, and
the University of Pennsylvania. WPSI’s youth program prepares local high school students for career opportunities with
real world work experience through its summer jobs program, professional internships program, small business after
school program, and service learning program. The service learning program encourages young people to design
and implement projects in their own community. A past project included a Lancaster Avenue Corridor Management
Project in which students surveyed and analyzed local businesses and corridor activity. Adult programs are based
on an ‘earn while you learn’ model, where individuals develop skills and transition to full time employment after
training. Career paths include certified medical assistance, health information technology, and animal care. These
opportunities provide benefits, offer wages that can support a family, and sometimes include subsidized tuition.
WPSI also provides career coaching, apprenticeships, and professional development for high school graduates.
30 RESTORING CENTRAL DOVER
Page 241
2
POSITIVE DEVELOPMENT
Page 242
20 Building condition ratings criteria
21 Surveyed building conditions of residential properties
It should be noted that because the building condition survey typically relies on judgments
based only on what is visible from the street, it is fair to say that the survey results overestimate
the condition of buildings, as defects on the sides and rears of buildings are often not visible.
SOURCE: Field survey, Nov 2013 - Jan 2014
32 RESTORING CENTRAL DOVER
Page 243
STRENGTHEN EXISTING HOUSING
Neighborhood building conditions shape perception of neighborhood character and potential. Distressed
buildings falling into disrepair, especially when concentrated, can make streets appear unsafe, deterring
new residents and investors. Developing strategies to help maintain and improve housing stock is essential
to ensuring long-term neighborhood vitality and encouraging reinvestment in Central Dover.
The Central Dover building conditions survey conducted as a part of this
planning process indicated that over a third of properties in the study
area were found to be in “Fair” condition, meaning that there are highly
visible cosmetic defects as well as visible indications of minor structural
issues present. Property owners have maintained their buildings fairly
well in the majority of the study area, but the map of building conditions
reveals concentrations of housing that is in need of repairs and potentially
substantial renovations.
EXPAND ACCESS TO HOUSING REPAIR
PROGRAMS
Housing repairs are currently available to a limited number of lower income
homeowners annually through the City of Dover’s CDBG program. Help
existing residents, particularly low- to moderate-income households
preserve the affordability of their homes through the establishment
of an expanded housing repair program. Set as a housing priority the
preservation of existing and development of more affordable housing for affordable. As repayments are made, the principal is lent out again to new
low- to moderate-income residents, focusing on homeownership to enable borrowers, thus the revolving nature of the loan pool to sustain it over time.
families to have a stake in their community. Provide educational resources
and training for homeowners in the areas of: INITIATE VOLUNTEER-BASED NEIGHBORHOOD
> Repair and rehabilitation techniques HOUSING REPAIR ORGANIZATION
> Homeownership and financial responsibilities 42% of Central Dover’s housing stock is in either “C” or “D” (Fair or Poor)
> Financial management and credit repair condition. With a little professional guidance, resources, and elbow grease,
these properties could be restored and improve block perception, helping
Establish a rehabilitation revolving loan fund capitalized by CDBG funds at to stabilize residential streets in the area. Central Delaware Habitat for
a low interest rate (in the neighborhood of 1%) and attract a foundation, Humanity is interested in bringing their minor repair program currently
bank or CDFI to match the initial amount at a low rate of interest so it is operating in Frederica to Dover in late 2015. The program encompasses
II. POSITIVE DEVELOPMENT 33
Page 244
exterior painting/minor exterior repairs per home in which volunteers from STRENGTHEN CODE ENFORCEMENT
business, industry and the community pitch in with the owners to take
One of the issues residents raised repeatedly as a major concern by
on home repair and beautification projects in the neighborhood. There
Central Dover stakeholders was the lack of accountability displayed by
are also similar mission-based groups active in Central Dover that could
some property owners, particularly absentee rental property owners.
be partnered with to help restore existing housing. Additionally, MHDC
Holding property owners responsible for derelict housing by strengthening
currently provides emergency housing repairs and First State CAA operates
code enforcement in areas with high concentrations of renters and safety
a weatherization / repair program which could be targeted to the area.
code violations is essential to ongoing neighborhood revitalization efforts
in Central Dover.
These recommendations provide for an opportunity for Central Dover to
link this kind of investment with the proposed model block concept and
> Initiate a third party needs assessment to determine whether staffing
related community building activities described in the previous chapter. To
or technology solutions (such as a web-based permitting and
that end, a task force should be created to:
development resource center) would help improve code enforcement
efficiency.
> Identify the nature and extent of any incentives—financial and
> Provide educational resources and training to homeowners and
technical—needed to bring such a program to the community.
landlords to help them make better decisions about their properties.
> Bring it to scale over time and ensure that it targets strategic locations
> Explore with City and state programs to provide financing incentives
consistent with the Restoring Central Dover Plan.
for code compliance for rental properties.
> Leverage other investments in the blocks targeted and in other
> Begin notification to the City of Dover by the Dover Housing Authority
initiatives that are priorities and spelled out in the Plan.
(DHA) and the Delaware State Housing Authority when Vouchers and
> Improve and/or extend partnerships with local government agencies,
Section 8 Rental Payments are suspended for a rental housing unit
and technical and financial intermediaries to work closer together to
due to a failed DHA or DSHA inspection.
avoid any duplication of effort in fashioning the program.
LANDLORD TRAINING
The nationally recognized Landlord Training Program in Portland, OR
has been adopted by over 400 cities and counties across the nation,
and includes a separate focus on Section 8 housing. The training
workshop focuses on keeping rental properties safe and free of illegal
activity by training landlords in effective property management
and techniques for dealing with illegal activities by tenants.
LEARN MORE portlandonline.com/BDS/index
The Good Landlord Program in Ogden City, Utah provides incentives
for landlords and apartment managers who go through training and
implement the lessons on eliminating code violations,
illegal activity and public nuisances through discounts
on business permits and disproportionate impact fees.
Creating a web-based permitting and development resource center could make information
more accessible than it currently is in pamphlet form at City Hall.
LEARN MORE ogdencity.com/en/doing_business/
34 RESTORING CENTRAL DOVER
Page 245
EXPLORE WAYS TO BOOST HOMEOWNERSHIP From the existing tenant population of Central Dover and from workers
regularly commuting to Central Dover, recruit potentially interested first-
The 25% homeownership rate in Central Dover stands in stark contrast
time home-buyers by introducing them to counseling programs and
to the City of Dover’s 52% homeownership rate. Explore the potential
financial incentives available through NCALL as well as from Delaware
for employer-assisted homeownership programs modeled off programs
State Housing Authority (DSHA) programs and the City of Dover. These
such as Delaware’s Live Near Your Work, the University of Pennsylvania’s
include:
Enhanced Forgivable Loan Program, and Philadelphia’s “Home-Buy-Now”
program that provide down-payment and closing costs assistance to
NCALL
company employees towards the purchase of a home in Central Dover.
> Homeownership counseling helps households become mortgage-
Start with major institutions and employers such as Bayhealth Medical
ready for conventional financing and special federal financing
Center, Wesley College, State of Delaware, Kraft Foods, etc.
programs, such as FHA and VA mortgage loans.
Explore with the City allowing qualified first-time home buyers in Central
DSHA
Dover to use CDBG home repair program funds to complete basic repairs
> Homeownership Loan Program that provides first mortgage financing
when purchasing their new home. This, along with other home repair
at below-market interest rates to qualified homebuyers.
programs and down payment assistance will help boost homeownership
> Delaware First-Time Homebuyer Tax Credit federal income tax credit
rates in the neighborhood.
designed to help make homeownership more affordable to qualified
homebuyers. Homebuyers who elect to use the federal tax credit are
Initiate discussions with the City regarding waiving impact fees and/or
eligible to claim a portion of the annual interest paid on their mortgage
discounting permit fees to incentivize affordable and market rate housing
as a special tax credit.
in Central Dover primarily for homeownership.
> Second Mortgage Assistance Loan (SMAL) assists income qualified
borrowers in the purchase of their own home by providing down-
payment and closing cost assistance in the form of second mortgages.
> Advantage 3 grant program assists qualified borrowers in the
purchase of their own home by providing down payment and closing
costs assistance in the form of a grant equal to three percent (3%) of
the first mortgage loan amount.
CITY OF DOVER
> Dover First Start provides down payment and settlement assistance to
low and moderate income families who purchase eligible properties in
the City of Dover.
22 Housing occupancy and tenure
SOURCE: 2010 U.S. Census, 2007-2011 American Community Survey
II. POSITIVE DEVELOPMENT 35
Page 246
23 Resident priority uses for vacant land
Residents identified new housing development as a top priority
among ways to reuse the plan area’s vacant lots.
SOURCE: Neighborworks resident survey.
36 RESTORING CENTRAL DOVER
Page 247
SUPPORT NEW DEVELOPMENT
The Central Dover area has enough vacant land to comprise 25 football fields. Opportunities for residential
and commercial development in the plan area are considerable. Removing certain regulatory and
property acquisition barriers to development may encourage infill construction.
Encouraging more affordable and market rate housing and mixed use
development can help better unify the urban fabric by eliminating vacant
lots, as well as bring in new residents and businesses.
ENCOURAGE GREATER ZONING FLEXIBILITY
TO ENABLE INFILL HOUSING DEVELOPMENT
The City of Dover is in the process of revisiting the zoning code to make
redevelopment projects easier to get off the ground. This will require a
new framework that will steer infill development with new guidelines and
standards about acceptable building typologies and uses.
Development of duplexes and townhouses—residential typologies that
would be appropriate for the urban character of Central Dover—are currently
not allowed within the zoning regulations. Developing a zoning overlay
covering the Downtown Redevelopment District that identifies townhouse
and duplex developments as acceptable conditional uses could speed up
the approval process and encourage residential development. There could 24 Aggregated vacant land area
SOURCE: Field survey, Nov 2013 - Jan 2014
also be allowances made as part of the Planned Neighborhood Design
code, which would provide more flexibility in terms of setbacks and other
block standards in exchange for architectural elements that complement
the character of the area. Encourage neighborhood residents to be part of
setting the neighborhood and infill standards. properties hold can be challenging. 10% of all currently vacant lots are
owned by the City of Dover, meaning the majority of properties are held
FACILITATE PARCEL ASSEMBLY AND privately, and in some cases, property owners are resistant to selling their
holdings because of a perceived or anticipated investment and building
REDEVELOPMENT boom in downtown Dover. In order to encourage investment in the plan
Though there are 207 vacant properties in the Central Dover plan area area, the City should explore the following innovative mechanisms, among
(73 vacant buildings and 134 vacant lots), realizing the potential these others, to facilitate parcel assembly and redevelopment.
II. POSITIVE DEVELOPMENT 37
Page 248
LAND BANK
A land bank is “a public authority created to efficiently hold, manage
and develop tax-foreclosure property” and can be utilized as a planning
tool for long-term community development. Land banks use legal and
financial tools to put vacant, abandoned, and/or tax delinquent properties
back into the market for productive uses; and in most cases, because
vacant, abandoned, and/or tax delinquent properties are found within
older/economically depressed communities, the land bank encourages
redevelopment in these blighted areas. Across the country, municipalities
are establishing or reviewing the potential of land banks to reclaim blighted
areas. A land bank can also be established by a private organization in
coordination with the City of Dover. Central Dover could follow suit and
create a land bank as part of its revitalization efforts.
LAND TRUST
A community land trust is a non-profit, community-based organization that
works to provide perpetually affordable home ownership opportunities. The
land trust acquires land and removes it from the speculative, for-profit, real
estate market. The land trust then holds the land it owns “in trust” forever
for the benefit of the community by ensuring that it will always remain
affordable for homebuyers. The land trust provides permanently affordable
housing by owning the land of a particular property but selling the home
on the land to an income-qualified buyer. The homeowner then leases the
land from the land trust through a 99-year, renewable ground lease. Local
housing advocates and other partners should open dialogue with the City,
potentially consulting the Diamond State Community Land Trust, about
whether or not this approach would serve Central Dover well.
25 Infill development opportunity sites
From a the full inventory of vacant buildings, vacant land, and parking lots in the Central
Dover study area (above left), clusters of development opportunity sites within walking
distance of Loockerman are identified in orange (below left). Prioritizing development
close to Loockerman will reinforce commercial corridor revitalization efforts. Proposed
development typologies include infill housing, mixed use campus development, and
potential longer-term transit-oriented development, pending establishment of regional rail
connections discussed in the following chapter.
SOURCE: Field survey, Nov 2013 - Jan 2014
38 RESTORING CENTRAL DOVER
Page 249
EVALUATE WAYS OF PROVIDING FINANCIAL
INCENTIVES FOR DEVELOPMENT
Property acquisition and construction costs are higher in Dover than in
neighboring areas—without commensurately higher rents or sales prices.
In order to attract developers to the Central Dover area, the City should
consider waiving City impact fees and/or discount permit fees and real
estate taxes to incentivize housing in general and affordable housing in
particular.
EXPAND ACCESS TO AFFORDABLE HOUSING
Recruit and select housing developers such as NCALL, MHDC, Central
Delaware Habitat and others to develop affordable and market rate housing
for homeowners in Central Dover. For example, Central Delaware Habitat for
Humanity serves Kent County targeting families with incomes at and below
60% of area-wide median income. Their program holds and services all the
mortgages on completed homes sold to first-time homebuyers. Habitat for
Humanity is currently pursuing financing and other needed resources to
build homes in Central Dover and NCALL has executed support letters
indicating the project is consistent with the ongoing planning process. The
targeted properties are located on Kirkwood and Queen Street.
26 Barriers to homeownership
63% of surveyed residents report that they would not consider buying a house in Central
Dover. Highlighting the need for more affordable housing in Central Dover, slightly more
than half of renters identified their personal financial situation as the primary reason why
they have not yet bought a home.
SOURCE: Neighborworks resident survey
II. POSITIVE DEVELOPMENT 39
Page 250
PROVIDE ASSISTANCE IN ACTIVATING UPPER
STORIES ALONG LOOCKERMAN STREET
There have been a number of initiatives aimed at filling vacant commercial
spaces along Loockerman Street. Though businesses along Loockerman
have strengthened in recent years, Loockerman still has the potential to
become a vibrant commercial district. One way to push it in that direction
would be to encourage residents to live along the corridor in upper story
apartments so they can be at the center of momentum building in Central
Dover. Property owners should be supported in their efforts to create
high quality housing with good tenants. Assistance can come in the form
of permitting and design assitance to convert upper stories, as well as
potentially relaxed regulations to facilitate conversion, as long as such
flexibility does not compromise safety standards.
Coordinating with the Downtown Dover Partnership, local partners should
seek to establish financial assistance programs for basic systems repair
and façade improvements for owners who cannot afford them on their
own. Such improvements lower utility costs and enhance security for
tenants, while also lowering operating costs and enhancing the property
value for landlords.
The upper buildings of some buildings more readily lend themselves to
other uses, especially where a second means of egress cannot be created
to support residential units above the first floor. Upper story artist studios,
small offices, and coworking spaces would bring increased activity to
Loockerman, as well as support existing businesses along the corridor.
EXPLORE OPPORTUNITIES TO CREATE
STUDENT HOUSING OPTIONS OFF CAMPUS
Wesley College is an anchor educational institution with 2,100 students
situated in the northeastern section of the plan area. The college has
been looking for ways to deepen its relationship within the community
it is embedded in. Neighborhood residents would like Wesley to take a
bigger role in helping revitalize the neighborhood and encourage students
to become a part of the community fabric. One way to do this would be
to expand off-campus mixed use student housing offerings linking the
campus to Loockerman. Mixed use development with ground floor retail
in this area would also make it more pedestrian-friendly and encourage
students to frequent stores on the Loockerman commercial corridor.
40 RESTORING CENTRAL DOVER
Page 251
REINVEST IN COMMERCIAL CORRIDORS
Loockerman Street is home to the main commercial corridor of Central Dover. Currently, Loockerman is
made up primarily of small, locally-owned boutique or specialty shops; only one retail chain occupies
space along the strip, which gives the corridor a unique character and identity. However, the turnover
rate is high and there are a number of vacant commercial spaces and lots that could provide ground for
new forms of retail and entertainment. Presently, there are 16 vacant build-
ings, 6 partially vacant commercial spaces, and 2 vacant lots on Loock-
erman alone that can be repurposed and re-imagined. The vacancy rate
changes monthly as two new retail shops plan to open in September 2014.
Developing a strategy to not only fill vacancy in commercial areas, but also
recast corridors like Loockerman as vibrant and bustling consumer attrac-
tions, will not only improve the revenue streams of existing businesses, but
will also draw visitors from all over Delaware and the tri-state area to ex-
perience the newly restored Central Dover and its small business-oriented
retail corridor.
BUILD AND EXPAND ON MARKETING/
BRANDING EFFORTS FOR THE LOOCKERMAN
STREET CORRIDOR AND CENTRAL DOVER
Marketing will play a big role in helping change the perception of the
Loockerman Street Corridor. A review and potential revision of the current
marketing tag line, “Historically Happening,” as well as the Downtown Market
Plan should be completed in the near term. Identifying who the various
customer groups and business types Central Dover should be targeting will
help shape the type of marketing and branding plan necessary to draw-
in the retail and entertainment that will position Loockerman to become
a vibrant and lively commercial district. Recruitment of the needed retail
and businesses will need to occur as well. Marketing materials and social 27 Vacancy and utilization of areas zoned for commercial uses
media efforts tailored to potential residents, investors, and businesses SOURCE: Field survey, Nov 2013 - Jan 2014
should be developed to promote reinvestment in the area.
II. POSITIVE DEVELOPMENT 41
Page 252
ACTIVATE VACANT STOREFRONTS
Though there a number of new businesses popping up along Loockerman
Street, high vacancy and turn-over rates are persistent issues. With
downtown revitalization efforts already underway, one approach to quickly
turn around the negative effects of vacancy along commercial corridors is
to develop an interim strategy that transforms empty commercial spaces
into temporary gallery spaces showcasing the creative work of youth living
in Central Dover or displays about area nonprofit organizations. Many of
the commercial spaces along Loockerman have large display windows,
providing an opportunity to brand the corridor as a creative place, add color
and interest to the streetscape, and establish exhibition venues for emerging
artists. Temporary storefront installations could also be an opportunity to
merge commercial corridor revitalization with social services through an
art therapy program such as the Creative Vision Factory in Wilmington,
Delaware. In addition, the City and its partners should encourage “pop-
up” stores and incubator businesses for a three month trial with three
months free rent, which would serve to both activate gaps in the corridor
and create opportunities for entrepreneurs and small retailers to establish
themselves in Central Dover.
28 Conceptual visualization of temporary vacant storefront
installation
ADDRESS CONCENTRATED LOITERING
The vitality of Central Dover’s commercial corridors relies on perception of
the area. Some businesses in the vicinity of Loockerman are generating
activities that deter customers and new businesses. Though such
operations generate revenue for the City, in Central Dover they contribute
CREATIVE VISION FACTORY
to loitering and exacerbate vagrancy in the area. The perception is that the
loitering and vagrancy leads to high crime incidents. Revisiting licensing The mission of the Creative Vision
requirements, zoning restrictions, and potential ordinances regarding Factory in Wilmington, Delaware, is
nuisance businesses as well direct approaches to such business owners to support artistic endeavors of those
with behavioral health disorders and
about how to change their business’ image and patronage, will be useful encourage their participation in the
in protecting the commercial viability of Central Dover, and will ensure that local artistic community through
the negative impact of nuisance businesses will be minimized over time. exhibitions and workshops. The factory
recognizes the value of creativity and
expression in assisting in the promotion
EXPAND SMALL BUSINESS DEVELOPMENT of recovery. Michael Kalmbach, who
developed the Factory, feels it can
PROGRAMS FOR NEW AND EXISTING BUSINESS serve as a path to employment. The
OWNERS communal workspace is free to those
with behavioral health disorders
Small business owners like those who own the boutiques and specialty and open to the community for a
shops along Loockerman are entrepreneurs who have taken a risk to minimal monthly membership fee.
open an enterprise to sell a product or service they believe the community
wants or needs. Sustaining new and existing small businesses can be a
LEARN MORE thecreativevisionfactory.org
42 RESTORING CENTRAL DOVER
Page 253
difficult task in today’s fast paced economy. There are opportunities to RECRUIT MAJOR LOCAL EMPLOYERS TO
help prepare burgeoning entrepreneurs and long-time business owners
for the constant fluctuation of the market and consumer taste. Currently,
ESTABLISH SATELLITE OFFICES ON
the Downtown Dover Partnership offers some business assistance in the COMMERCIAL CORRIDORS
form of information on “loan programs, available incentives and grants, and Dover is home to several notable private corporations and institutions. Kraft,
available spaces” in the downtown area. A network exists among the Playtex, Proctor and Gamble, Wesley College, and Bayhealth-Kent General
small business assistance providers to coordinate efforts; this collaboration are some of the major local employers within city boundaries. Encouraging
should continue and an expansion of the services offered will improve the these major employers to relocate their smaller operations and/or divisions
stability of Central Dover’s commercial base and broaden its diversity and to unoccupied commercial spaces within the plan area such as the new
offerings. E-ZPass location on Loockerman Street will bring more employees into the
downtown areas to shop and eat, which will strengthen Loockerman as a
commercial corridor and encourage continued revitalization in surrounding
areas.
II. POSITIVE DEVELOPMENT 43
Page 254
29 Top employers in Dover
SOURCE: Kent Economic Partnership, Inc
44 RESTORING CENTRAL DOVER
Page 255
ENSURE EQUITABLE ECONOMIC DEVELOPMENT
The racial and ethnic composition of Central Dover has grown more diverse over the past decade. From
2000 to 2010, the plan area saw a 12% increase in total population, from 3,323 to 3,735 residents. During
that period, the percentage of those identifying as persons of color increased by 6%, with the European
American cohort dropping from 41% to 34%.
While the plan area’s population has grown more diverse, it appears
employment opportunities have not. In 2010, the unemployment rate for
Central Dover was approximately 10%; and while over 3,500 employees
work within the plan area, only 1% actually resides and works in Central
Dover. Truly restoring Central Dover must involve community and business
leaders working together to confront the lack of access and disparity
Central Dover’s people of color are currently facing.
DEVELOP A COMPREHENSIVE WORKFORCE
DEVELOPMENT STRATEGY
Linking Central Dover residents with the skills they need to compete for
quality jobs will support both regional economic strength and local vitality.
Equalizing economic opportunity requires the cooperation of private, public,
and nonprofit sectors. The nature of this collaboration and partnership
brings benefits to all participants: local residents secure family wage jobs
and employers’ participation in building a skilled workforce ensures their
own success.
A critical part of this effort will be to leverage existing major employers to
drive growth and boost local employment. Invite local business and industry
to help address the unemployment and underemployment issue in Central
Dover. Among the ideas and initiatives to explore include:
> Mechanisms that promote job growth and better enable African
30 Worker inflow & outflow
SOURCE: Bureau of Labor Statistics
Americans and other disenfranchised individuals to overcome systemic
barriers to living wage employment
> Development of industry partnership programs between employers
and workforce representatives with targeted recruitment efforts in
II. POSITIVE DEVELOPMENT 45
Page 256
Central Dover
> Investments in:
- Prisoner and ex-offender education programs as part of
workforce development.
- Youth workforce and internship programs.
- Entrepreneurship and capacity building programs for minority-
and women-owned business enterprises.
> Corporate and institutional policies that increase workforce diversity
(especially at management levels), and the hiring of ex-offenders.
Explore potential pilot programs with the DelMarVa Black Chamber of
Commerce modeled after Incubator Without Walls and the Ice House
Entrepreneurship Program. Incubator Without Walls (IWOW) is a program
for developing a skilled workforce to help power economic growth and the
Ice House Entrepreneurship Program promotes entrepreneurship working
with young adults to achieve learning objectives.
COMPLETE ECONOMIC INCLUSION STUDY
As a first step towards ensuring diversity within business opportunities,
complete and publish the City-funded Economic Inclusion Study of Dover –
commissioned by the DelMarVa Black Chamber of Commerce (DBCC) that
is modeled off of a similar analysis of Pittsburgh, PA concluding that, among
other contributing factors, racial equity and inclusion are cornerstones
of sustained development and successful, healthy economies for that
particular region. The lack of minority participation in a number of high-
profile and large construction projects (in the Central Dover community
and the Dover region in general) recently and over time prompted DBCC
to bring the need for such an analysis to light publicly and to seek partners
to help sponsor and fund it. The Restoring Central Dover plan and the
prospects of it leveraging public and private resources present a unique
opportunity to advance both agendas by linking economic inclusion as a
policy and practice with community revitalization as a goal.
46 RESTORING CENTRAL DOVER
Page 257
3
AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE
Page 258
31 Mode of travel to work: Central Dover versus City of Dover
SOURCE: 2007-2011 American Community Survey
48 RESTORING CENTRAL DOVER
Page 259
IMPROVE TRANSPORTATION INFRASTRUCTURE
Aside from the largely institutional areas south of Loockerman, the Central Dover area is a fairly walkable
urban fabric. However, the contextual land use patterns and low-density development standard in the
region result in a pervasive reliance on cars for personal transportation. The worker inflow and outflow, as
well as travel mode to work data also suggest the same. More than 3,500 workers come into the Central
Dover area from areas outside and 84% of workers living in Central Dover
use a personal vehicle to get to work. There are a number of reasons
to make a concerted effort to improve and expand levels of service for
alternative transportation options in Central Dover, including:
> As costs of owning and maintaining a car continue to trend upward,
improving public transportation infrastructure will expand access to
the city and provide stability for Central Dover’s low-income residents
looking to broaden their opportunities.
> Enhanced public transportation and more balanced streets will
improve quality of life for Central Dover’s senior population and those
with physical disabilities.
> Investing in alternative transportation can help boost economic
development efforts by attracting new residents and businesses who
are attracted to these amenities.
> Promoting walking and biking can help fight the childhood obesity
epidemic and encourage healthier lifestyles in general.
The following recommendations seek to improve mobility and establish
more balanced streets in the Central Dover area.
EXPAND AND ENHANCE TRANSIT SERVICES
Central Dover residents and stakeholders were vocal about the need for
expanded DART bus services. Though only 3% of Dover residents use
public transit, this may be due to the limited routes and times of operation
provided. According to residents who participated in the May Open House, 32 Community-identified public transit issues
the bus is simply not an option for individuals working late shifts, with SOURCE: Public open house input
services ending at 9 p.m. and no buses running on the weekends. Also,
there are no regional routes for workers who are employed in surrounding
suburbs or towns. For these reasons, city officials and neighborhood civic
III. AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE 49
Page 260
groups should be advocating for more routes and better times of operations
to ensure all workers who need public transit have a way to their jobs. As
a first step, an in-depth transportation accessibility study specifically for
Central Dover should be completed focusing on the needs of existing and
potential transit users, as well as evaluating current levels of service. This
information should be used to form the foundation of decision-making
on the part of city officials and transit authorities to improve alternative
transportation options and accessibility for Central Dover residents,
workers, and visitors.
Feedback generated as a part of this process suggested this study should
explore:
> Establishing a bus line with frequent service along Route 13 and 113
through all three counties
> Linking Central Dover residents to employment centers outside the
neighborhood to increase access to job opportunities
> Feasibility of extending hours of operations on nights and weekends Dover transit depot
to better accommodate workers
> Potential demand for mid-day routes targeting the elderly and those
accessing child care
> Whether or not the renaming of lines using place names would help Bus shelters should be equipped with clear route maps and schedules,
improve the user experience by boosting awareness of which lines which could also serve as opportunities to raise awareness of locations of
serve which locations. For instance, the route 109 service line could arts, cultural, and historic destinations and events in the area.
be renamed the “Central Dover – Dover Mall” line to readily indicate
the two endpoints of the route. A comprehensive assessment of existing bus stop infrastructure in Central
Dover should be coordinated with above mentioned transit access study
The process for this study should include in-depth public outreach and and completed in the near term to determine:
community engagement to ensure that transit service decisions are
informed by local demand and feedback. > Which bus stops need to be improved to meet accessibility standards
> Whether there are locations along existing routes that should become
IMPROVE BUS STOPS AND TRANSIT DEPOT new bus stops
In many cases, waiting for the bus in Central Dover can be a trying
experience. The lack of proper bus shelters make for very uncomfortable In addition to bus shelters, other community members highlighted the
conditions for residents waiting on buses. Some residents have witnessed need for improvements to the Dover Transit Center located along W. Water
“people waiting in ditches…in the rain or extreme weather without cover.” Street. Proposed improvements called for included seating, shelter, public
Providing covered bus shelters for frequently used locations would not only rest rooms, and real-time schedule displays. Original plans for the Transit
improve the public transportation experience, they would also increase the Center called for a second building that would house bathrooms, stores,
visibility and awareness of the bus stop locations, which can in turn boost eateries, and office space. These amenities would serve to activate the
ridership. Attractive bus shelters also serve well as streetscape amenities Transit Center and improve perception of the area. DelDOT, the State
that have the potential to raise the image and perception of Central Dover. of Delaware, and City of Dover should resume conversations about the
feasibility of moving forward with completion of this plan.
50 RESTORING CENTRAL DOVER
Page 261
ADVOCATE FOR A REGIONAL TRANSIT
CONNECTION STUDY
Though it is the State capital and is centrally located in Delaware, Dover
has no regional rail transit connecting it to Wilmington or other cities along
the eastern seaboard. Community leaders and residents in Central Dover
see great potential in leveraging Central Dover’s proximity to beaches
along the coastline, Dover Downs, and other major destinations by linking
Wilmington to the mid-Atlantic passenger rail network. There is the sense
that Central Dover is perceived as a “pass-through” or “pass-around” place
for the visitors coming through the region. Locating a regional train station
and multi-modal hub here would bring visitors to Central Dover itself, which
could have great impacts on job development and reinvestment.
A central component of DelDOT’s 2011 Delaware State Rail Plan was to
provide an implementation framework for both passenger and freight rail
improvement initiatives in Delaware. Named as a “High” priority among the
proposed studies to initiate in order to continue to explore the feasibility
of potential rail improvement projects, a commuter rail link between Kent
County and New Castle County could be established along the Norfolk
Southern rail alignment [Fig 33]. A passenger rail service along this line
would bring travelers to the threshold of the Loockerman corridor, while
also providing a regional connection within walking distance of Dover’s
cluster of government and justice system buildings. Local partners should
push for the completion of this study and advocate for the passenger rail
link.
Improved east-west regional bus transit connections would better link
Dover to beach destinations along the shore less than 20 minutes away,
as well as Washington, DC, 2 hours west. These routes would most likely
be served by private intercity bus common carriers and a demand study
demonstrating sufficient need may be necessary to recruit companies. The
scope of this study could be folded into the DART study referenced above.
33 Potential regional rail connection
SOURCE: DelDOT, 2011 Delaware State Rail Plan
WORK TO SUBSIDIZE YOUTH AND FAMILY
TRANSIT ACCESS
46% of Central Dover households make less than $30,000 a year. In model may be found in San Francisco’s Municipal Transportation Agency,
many cases, low-income families living in the plan area are likely to spend which currently allows low-income youth to ride public transit for free. The
a sizeable portion of their earnings on transportation to work and school. State Social Service Department should explore whether they may be able
To help lighten their load, DART and the City of Dover should consider to integrate this subsidy as part of the benefits provided to the families and
subsidizing transit costs for low-income families and the elderly. A useful individuals qualifying for specific social services.
III. AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE 51
Page 262
34 Community-identified bicycle network issues
SOURCE: Public open house
BUILD ON EXISTING BIKE INFRASTRUCTURE
Parallel to the Restoring Central Dover planning process, the City of Dover
conducted its own city-wide comprehensive bicycle and pedestrian planning
process. The ideas related to bicycle and pedestrian improvements as a
part of this study are intended to supplement this work with accessibility
and public realm improvement ideas specific to the Central Dover area. The
map in Fig 35 shows a network of existing and proposed improvements
to the bicycle network in the Central Dover area. The network intends to
link existing and potential off-street bike trails along Silver Lake Park and
Capital Green to the Dover Transit Center and Wesley campus, while also
providing enhanced through-access on Division/Route 8 and Loockerman. 35 Proposed bicycle network improvements
52 RESTORING CENTRAL DOVER
Page 263
> The generous right-of-way width of Forest Street/Route 8 allows for
opportunities to install separated bicycle infrastructure that would both
improve bikeability and elevate the image and perception of this main
gateway into Central Dover. The existing and proposed typical street
sections demonstrate that bike trails separated from the vehicle travel
lanes by a 5-foot landscaped buffer could be established without
sacrificing level of service for vehicles. Rebranding the corridor as part
of a major streetscaping effort such as this, “Forest Street Parkway” or
“Forest Street Bikeway,” for example, could promote and highlight it as
a local amenity.
36 Existing and proposed Forest Street/Route 8 right of way con-
figuration
III. AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE 53
Page 264
> As a main thoroughfare and secondary commercial corridor, there
is much room to improve the streetscape along Division Street and
make it safer for bikers and pedestrians. While some blocks have been
recently repaved, there are some stretches of sidewalks along Division
that have eroded entirely. Reconsidering intersection circulation along
Division Street could allow for more pedestrian-oriented provisions.
Division Street currently requires through-traffic to continually jog over
to the right outer edge of intersections, where otherwise there are
mid-block on-street parking aisles except at corners. Traffic turning
left is given sole access to the left travel lane. This pattern currently
precludes the creation of bump-outs, which would make pedestrians
more visible and reduce crossing distances. Traffic levels may not
necessitate the dedication of the travel lane to left turns only. Local
partners should work with DelDOT to explore other alternatives that
are more equitable across modes.
IMPROVE PEDESTRIAN CONNECTIVITY AND
INFRASTRUCTURE
For Central Dover’s seniors, getting around on the neighborhood’s
sidewalks can be difficult—not just as a result of the mobility challenges
of aging, but because many sidewalks are in need of repair. These issues
are problematic for other users as well, including physically challenged
individuals, and pedestrians pushing strollers or shopping caddies.
Many property owners may not be aware of their responsibility to keep
adjacent sidewalks in good shape. One result of this has been that the
City has taken on the task of repairing or replacing sidewalks in need.
A marketing and awareness campaign is needed to encourage property
owners to repair their sidewalks. It would be more effective if this campaign
included financial assistance to help with making repairs. However, the
pervasiveness of broken and eroded sidewalks alongside vacant lots
and buildings requires other solutions, as attempts to encourage owners
of abandoned properties will likely prove fruitless. The City should be
supported with increased resources for sidewalk repair to handle cases
where property owners cannot be held accountable for sidewalk condition.
In some cases trees may need to be removed and replaced where roots
have created hazardous conditions for pedestrians.
In addition to keeping Central Dover’s sidewalks in good shape, community 37 Existing and proposed Division Street right of way
members highlighted the need for more signage and streetscape configuration
improvements to increase visibility of pedestrians and remind motorists
54 RESTORING CENTRAL DOVER
Page 265
when pedestrians have the right of way. Specifically mentioned was the CONDUCT A COMPREHENSIVE PARKING
need to protect pedestrians in crosswalks from motorists, especially
when they are making left turns through an intersection. In addition to
STUDY FOR CENTRAL DOVER
targeted enforcement of traffic laws, bumpouts, signage, and striping Parking became a somewhat contentious issue close to the completion
enhancements can help improve pedestrian safety. The City and DelDOT of the planning process. Throughout the majority of conversations related
should be supported in their efforts to implement improvements resulting to parking, stakeholders reported that parking is only perceived to be a
from the City of Dover’s Pedestrian Plan, developed concurrently with the problem, and that only larger-scale events can present issues for those
Restoring Central Dover plan. who arrive to the greater Loockerman corridor looking for parking.
Some felt that many have the expectation that they or their customers
should be able to park on the same block as their destination, but that
this is not a realistic expectation. Some offered criticism of public parking
spaces being dedicated to particular entities, which reduces their utility
overall. Another facet to this is that while there is available parking in the
Governors Avenue parking lot, perceptions of safety in this area make
this an undesirable location for many to park. Local partners should seek
resources to conduct a comprehensive parking inventory and analysis
to determine what strategies might be most appropriate for a range of
development scenarios along the greater Loockerman corridor area, as
well as what improvements can be made to improve perception of safety
in existing parking lots.
Central Dover is fortunate to have had city leaders with the good sense to
situate parking lots behind buildings fronting the Loockerman, rather than
creating activity gaps in the commercial corridor by placing parking directly
adjacent to the street. However, it can be difficult to judge from the street
whether there are parking spaces available in these lots, and, if so, whether
they are public or dedicated parking spaces. The parking study should
explore the feasibility and desirability of developing of a smart phone
app that provides real-time map information identifying parking spaces
available nearby. Parking lots could also feature electronic signs near the
entrance displaying the number of parking spaces publicly available at any
given time.
An interim solution would be to produce a printed map handout showing
locations of parking lots in the Loockerman area and distribute them to
local businesses. This would be an easy way for business owners to help
their customers find parking available nearby if on-street spaces are not
The lack of pedestrian connectivity from Simon Circle to Saulsbury Road Park and Gateway
West Shopping Center [above] has forced residents to create their own path. Division available.
Street at the rail line [below] is well-traveled by students walking to or from Booker T
Washington Elementary, William Henry Middle School, Academy of Dover Charter School,
and other schools located off of Forest Street west of the rail line. However, the sidewalk
along this busy street is impassable, as it has significantly deteriorated and infrastructure
has been located in the middle of the path, leaving little room for pedestrians.
III. AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE 55
Page 266
56 RESTORING CENTRAL DOVER
Page 267
ENHANCE OPEN SPACES AND EXPAND GREEN INFRASTRUCTURE
DEVELOP PROGRAMMED RECREATION SPACES
Central Dover community members were vocal about the need to program
existing open spaces with equipment and activities to keep neighborhood
youth active. Local partners should consider pursuing resources to refresh
local parks and play spaces not only to improve them as community
amenities, but as a venue for continued community building among
residents and neighborhood dialogue. Public input should be a key
component of decision making around redesigning and investing in Central
Dover’s parks and open spaces. Resources for community-driven design
initiatives should be secured to re-envision these community assets.
STRATEGICALLY DEVELOP POCKET PARKS ON
VACANT LOTS
When asked what types of new uses should be prioritized in the reuse of
vacant lots in Central Dover, a combined 69% of the responses identified
new housing as their top or second priority. 70% identified park and
recreation space as their top two priorities, with still others identifying
community gardens and open spaces. Temporary improvements to vacant
lots could go a long way towards improving perception of the area, especially
along and near main thoroughfares like Loockerman and Division. Priority
should be placed on residential and mixed use infill development on
vacant lots within walking distance of the Loockerman corridor in order
to promote the residential density needed to revitalize and sustain this
struggling commercial corridor. That said, this study identifies clusters of
vacant land at the edge of this quarter mile catchment area that should be
explored as opportunities for new open space amenities, including pocket 38 Potential pocket park opportunity sites
parks, community gardens, tot lots, playgrounds, and so on.
III. AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE 57
Page 268
CREATE A WEST LOOCKERMAN GATEWAY
PARK
The recent commercial real estate development at the western gateway to
Loockerman at Forest Street retained a large vacant lot for a future phase
development. Given the perception issues impacting Loockerman and the
need to improve the image of the corridor, this vacant lot is strategically
positioned to serve as a temporary gateway park amenity. Low-cost
improvements including branding and plantings could go a long way
towards making a positive impression for those entering Loockerman from
the west. The City and local partners should explore potential improvement
scenarios for this lot and surrounding streetscape. This location should
also be considered for a bus shelter.
ENABLE PLAY STREET DESIGNATION
Playstreets are temporary street closings established during the summer
months by municipal order to allow kids to play without the interruption of
car traffic. This is a very low to no cost way to add safe places for kids to
play where parents and neighbors can keep watch over them. Typically,
residents can suggest when and where they would like a playstreet created,
subject to City approval. The City of Dover should consider establishing
39 Location of potential Loockerman gateway park
a playstreets policy and program to enable resident groups to establish
playstreets to give neighborhood kids more accessible spaces for play.
To establish a playstreet in Philadelphia, for example, an application with
signatures from 75% of block residents must be filed with the Department
of Recreation by the end of May. These streets can be programmed with
equipment such as wading pools and sprinklers, volleyball nets, or basketball
hoops, or they can be left for spontaneous play. There are several small
residential streets in Central Dover that would be good candidates for
playstreets—especially those that are only a block or two long and do not
carry heavy through traffic. Establishing play streets could be a component
of early initiatives to cultivate neighborhood groups in Central Dover.
58 RESTORING CENTRAL DOVER
Page 269
INTEGRATE GREEN STORMWATER
MANAGEMENT ON WATER STREET
Community members identified Water Street as a problematic flooding
hotspot during rain events. The City is addressing this issue through
underground stormwater infrastructure improvements to increase capacity.
There may also be some value in using green stormwater infrastructure
at street level to retain excess runoff on Water Street and adjacent
streets that drain towards Water Street. Thinking of this infrastructure as
an amenity that can be designed into the street along with a stretch of
the proposed bike network would allow the City to generate increased
community benefits from the public investment. The rain gardens and
retention beds would also serve to create a buffer between Water Street
vehicular traffic and bicycle lanes.
40 Community-identified flooding areas 41 Existing and proposed Water Street right of way configuration
SOURCE: Public open house
III. AN INTEGRATED PUBLIC REALM AND INFRASTRUCTURE 59
Page 271
APPENDIX A:
IMPLEMENTATION
APPROACH
Page 272
IMPLEMENTATION APPROACH
The Restoring Central Dover plan outlines paths for the community to Taking a first step towards that end, as a more formal structure to guide
continue to guide change over the next five years. The preceding plan the plan’s implementation, NCALL should create an Implementation
narrative describes multiple strategies for the plan’s leadership and Committee that is accountable for tracking the status of initiatives set forth
partners to pursue, each recommendation requiring a different set of in the plan and the progress of the different individuals / committees that
partners, which enables many proposals to be addressed concurrently. In are overseeing each component. The Implementation Committee should
addition, many of the recommendations are tailored to low-cost solutions meet monthly to coordinate and report on implementation achievements.
that can be implemented by volunteer efforts and through the existing Each sub-committee / individual must take responsibility for their part of
capacity of local organizations. Looking at the range of recommendations implementation, set aggressive schedules and monitor progress.
through the lens of phasing, responsibilities, costs, and sources of funds
organizes the plan into actionable steps, giving guidance on how and when
each initiative should be taken on.
PRIORITY ACTION ITEMS
The first action item for NCALL is to present this plan to city leadership for
The following implementation matrix tables should be actively used, review. The intent is to get the plan recognized by these representatives as
updated, and changed to track the implementation progress. It should the designated plan for the Central Dover area and to raise awareness that
be noted that the costs are preliminary and will need to be refined as significant strides have been made to improve the community. This should
efforts move forward with each recommendation item. Similarly, although occur immediately following the plan’s finalization in October 2014. Further
a number of potential funding sources are identified for some items, it is priority actions related to transitioning the plan into the implementation
the responsibility of the plan’s leadership to determine the most attainable phase are:
source of funds at the time fundraising efforts are underway.
> Present the Restoring Central Dover plan to the City of Dover for
approval
CAPACITY TO IMPLEMENT: CHALLENGES AND
OPPORTUNITIES > Present the plan to the Wells Fargo Regional Foundation and submit
The implementation of many of these recommendations will require for a Neighborhood Implementation Grant
strong local capacity to guide actions, raise funds, organize community
members and groups, and coordinate activities. NCALL has demonstrated > Organize a committee structure for implementation
its capacity to implement a range of programs, bring resources to the
community, and provide community leadership in Central Dover. In taking Committees should be organized at two levels. An Implementation
steps toward implementation, this leadership role must be shared with Committee should be set up to provide oversight to a series of
city agencies, community nonprofits, and local institutions with which sub-committees tasked with implementing recommendations that
NCALL has fostered strategic partnerships. Ideally, in developing roles and fall within the five recommendations areas. The Implementation
structure among the community leaders and community based nonprofits Committee should pull from the staff and Board of NCALL, the
of Central Dover, these groups will recognize that this plan is just as much Steering Committee that oversaw the plan’s development, and Board
theirs to implement as NCALL’s. members from other local partners and institutions.
62 RESTORING CENTRAL DOVER
Page 273
The sub-committees should welcome broader participation from
residents and stakeholders regardless of their affliations with any one
organization. There should be one sub-committee that corresponds
with each of the recommendation areas, ideally built upon the Steering
Committee working groups assembled during plan development: A
Strong Community, Positive Development, and An Integrated Public
Realm and Infrastructure. Each sub-committee should be chaired by a
member of the Implementation Committee.
> Market the Plan & Expand the Local Base of Volunteers; Share the
Plan with Local Partner Organizations and Foundations
> Hand-deliver notice of the Plan’s completion along with printed
copies of the Executive Summary and a digital copy of the full plan
to adjacent neighborhood organizations, local partners, city agencies,
and foundations. Leave miniature versions of the Executive Summary
in local stores, churches, etc. to raise awareness among residents.
> Post a digital copy of the plan and executive summary on NCALL’s and
the City of Dover’s website and encourage partner organizations to do
the same. Ideally, the web page should enable individuals to be able to
get in touch with the plan’s leadership if they are interested in learning
more or getting involved in implementation initiatives.
> Write an op-ed column for the local newspaper and blogs dedicated
solely to the need for volunteer assistance with the Plan’s
implementation.
> Seek Downtown District Designation to facilitate and fund affordable
housing and business development activities
The Downtown Development District Act of 2014 was enacted by the
Delaware Legislature to spur private capital investment in commercial
business districts; stimulate job growth and commercial vitality;
help build stable communities of long term residents by improving
housing opportunities; and assist local governments in strengthening
neighborhoods and downtowns to be vibrant and attractive to
residents from all walks of life. The City of Dover plans to apply for this
designation during the first round in 2014. Selection as a Downtown
Development District will entitle private construction projects with
the identified District to receive grants to offset 20% of their capital
construction costs as well as other benefits.
IMPLEMENTATION APPROACH 63
Page 274
> Explore applying for a HUD Choice Neighborhood Grant
Use the “Restoring Central Dover Plan” when completed to set context
for Dover Housing Authority’s potential application to HUD for a
Choice Neighborhood Implementation grant. The grant would be used
to support the revitalization of Authority-owned and publicly assisted
housing in the 20-square block area of Loockerman to Mary, from State
to West. Choice Neighborhoods Implementation Grants support those
communities that have undergone a comprehensive local planning
process and are ready to implement their “Transformation Plan” to
redevelop the neighborhood. A successful Wells Fargo Regional
Foundation grant would serve as part of the required matching funds
required by HUD to be considered. Among the key partners that the
Dover Housing Authority should include to strengthen its application
are: the City of Dover, Wesley College Bayhealth, Dover Community
Partnership, Inc., NCALL, and Capital School District.
The following implementation matrix tables are sequenced according to
the same chapter / recommendation areas that organized the plan itself.
It is critical to anticipate that this plan can—and should—be updated in five
to ten years. Funding sources, political representatives, community leaders
and even some local priorities will change in ways that are impossible to
fully predict. This plan serves as a beginning. As different recommendations
move forward, priorities should be re-evaluated, and, if necessary, new
recommendations should be considered that reinforce the principles set
forth during this process.
64 RESTORING CENTRAL DOVER
Page 275
1 A STRONG COMMUNITY
u 1 BUILD COMMUNITY CAPITAL
Estimated Non- Estimated Capital
Recommendation Timeframe Responsibility / Partners Source of Funds Source of Funds Total Costs
Capital Cost Cost
Steering Committee /
NeighborWorks
ESTABLISH RESIDENT-LED CIVIC GROUPS Short Term NCALL/ CDHfH/ Dover $5,000 $0 $5,000
America
Housing Authority
Initial Action Steps - Determine existing groups, organize leadership, hold meetings, and develop leadership
DEVELOP COMMUNITY BUILDING
Wesley / Steering Wesley / Steering
PARTNERSHIP WITH ANCHOR
Short Term Committee / NCALL / $2,500 Committee / $0 $2,500
INSTITUTIONS
BayHealth NCALL / BayHealth
Initial Action Steps - Overtures to Wesley and Bayhealth
Discussions with Wesley about their Strategic Plan and BayHealth on their Community Impact Plan
Implement community building partnership
NeighborWorks
CREATE ANNUAL “CELEBRATING CENTRAL Short Term / Steering Committee / DIMH
$25,000 America and $0 $25,000
DOVER” BLOCK PARTY annually / NCALL
Sponsors
Initial Action Steps - Develop timeframe fall or spring
Assemble partners ans sponsors
Plan and hold event
EXPAND ON “COMMUNITY CLEAN-UP Wesley / CDHfH / DHA / WFRF/Partners
Short Term $25,000 $0 $25,000
DAYS” City of Dover and Sponsors
Initial Action Steps - Convene prior partners
Envision new plan going forward and hold events
DEVELOP AND DISTRIBUTE COMMUNITY
Short Term DDP/ Steering Committee $12,500 DDP $0 $12,500
CALENDAR OF ACTIVITES AND EVENTS
Initial Action Steps - Assemble dates, publish and distribute
EVALUATE LEVEL OF ACCESS TO Intermediate Family Services
$5,000 WFRF $0 $5,000
COMMUNITY FACILITES FOR SERVICES Term Collaborative
2 PREVENT CRIME AND INCREASE PUBLIC SAFETY
Estimated Non- Estimated Capital
Recommendation Timeframe Responsibility / Partners Source of Funds Source of Funds Total Costs
Capital Cost Cost
Dover PD / City of Dover
ESTABLISH COLLABORATIVE/COMMUNITY Human Relations WFRF / Dover
Short Term $25,000 $0 $25,000
POLICING Commission / Police Dept.
Neighborhood Leaders
Initial Action Steps - Form citizen oversight committee on community policing
Create neighborhood watch network
IMPLEMENTATION APPROACH 65
Page 276
Dover PD / Downtown DDP / City of Dover
Short Term / On-
DEPLOY POLICE FOOT AND BIKE PATROLS Dover Partnership / City of $500,000 / Law Enforcement $0 $500,000
going
Dover grants
Initial Action Steps - Convene meeting to discuss options with partners
Develop action plan and seek funding and deploy
DDP / City of Dover
EXPAND SURVEILLANCE CAMERA Intermediate Dover PD / DDP /
$0 $100,000 / Law Enforcement $100,000
NETWORK Term Community Leaders
grants
Initial Action Steps - Cost estimate for expanded system
Seek community buy-in
Seek funding for expanded surveillance cameras
Intermediate City of Dover / DDP / WFRF/ SEU / City
IMPROVE LIGHTING IN TARGETED AREAS $25,000 $2,500,000 City of Dover/SEU $2,525,000
Term SEU/Community Leaders of Dover
Initial Action Steps - Research and develop scenarios for resident assisted porch lighting program
Work with Sustainable Energy Utilities and install street lighting in poorly lit areas
3 ENGAGE YOUTH IN COMMUNITY
Estimated Non- Estimated Capital
Recommendation Timeframe Responsibility / Partners Source of Funds Source of Funds Total Costs
Capital Cost Cost
Steering Committee /
SUSTAIN AND EXPAND YOUTH PROGRAMMING Short Term Coordinator's time WFRF
NCALL
Dover PD / Faith Dover PD / Faith
SUPPORT EFFORTS TO EXPAND YOUTH ACTIVITY
Short Term Dover Police Department $25,000 Communities/ $25,000 Communities/ $50,000
PROGRAMMING - Restablish Police Athletic League
Volunteers Sponsors
Initial Action Steps - Dover Police Department is planning to establish PAL
Market PAL to community
Implement the program
WFRF /
Short Term /
CREATE YOUTH OUTREACH AND EDUCATIONAL Solid Rock Baptist Church / Foundations / Faith Events/ Banks/
Intermediate $250,000 $50,000 $300,000
SUPPORT CENTER Inner City Cultural League Communities/ Foundations
Term
Events
Initial Action Steps - Complete construction of facilities
Develop programming and curriculum
Examine access to broader community recreational assets and improve transportation to these assets for youth in Central Dover
PROVIDE COMMUNITY DEVELOPMENT VOCATIONAL Intermediate CDHfH / Dover Housing Depts. of Labor and
$225,000 $0 $225,000
OPPORTUNITIES Term Authority / DDP/ Polytech Education
Initial Action Steps - Examine Youth Build or similar programs for feasibility
Develop intern and mentoring opportunities in year 3, 4 and 5.
4 EXPAND ADULT AND FAMILY SERVICES
Estimated Non- Estimated Capital
Recommendation Timeframe Responsibility / Partners Source of Funds Source of Funds Total Costs
Capital Cost Cost
66 RESTORING CENTRAL DOVER
Page 277
Examine access to broader community recreational assets and improve transportation to these assets for youth in Central Dover
PROVIDE COMMUNITY DEVELOPMENT VOCATIONAL Intermediate CDHfH / Dover Housing Depts. of Labor and
$225,000 $0 $225,000
OPPORTUNITIES Term Authority / DDP/ Polytech Education
Initial Action Steps - Examine Youth Build or similar programs for feasibility
Develop intern and mentoring opportunities in year 3, 4 and 5.
4 EXPAND ADULT AND FAMILY SERVICES
Estimated Non- Estimated Capital
Recommendation Timeframe Responsibility / Partners Source of Funds Source of Funds Total Costs
Capital Cost Cost
Dover Interfaith / DHA /
STRENGTHEN AND EXPAND TRANSITIONAL Intermediate Potter Trust/ TD
Shepherd's Place / People's $150,000 $2,000,000 HDF/ FHLB/CDFIs $2,150,000
HOUSING AND RELATED SERVICES Term Bank
Place
Initial Action Steps - Target housing towards families with children
Convene partners and develop plan
Develop housing
Steering Committee / Social
ESTABLISH A FAMILY SERVICES COLLABORATIVE Short Term $25,000 WFRF $0 $25,000
Service Agencies
Initial Action Steps - Steering Committee facilitate initial meetings
Collaborative then establishes its ongoing agenda
WRFR/
PROVIDE FINANCIAL EDUCATION AND HOUSING Short Term/ On-
NCALL/ Credit Unions $100,000 NeighborWorks $0 $100,000
COUNSELING SERVICES going
/Banks
Initial Action Steps - Strategize ways to enagage the community residents
Identify site for workshops in the plan area
Refer to NCALL's on-going programs
TOTAL COSTS $6,075,000
IMPLEMENTATION APPROACH 67
Page 278
2 POSITIVE DEVELOPMENT
u 5. STRENGTHEN EXISTING HOUSING STOCK
Estimated Non -
Recommendation Timeframe Responsibility / Partners Source of Funds Estimated Capital Costs Source of Funds Total Costs
Capital Costs
Short Term / Intermediate City of Dover /CDHfH / MHDC / CDBG / City of Dover /
EXPAND ACCESS TO HOUSING REPAIR PROGRAMS $125,000 WFRF / Banks $1,875,000 $2,000,000
Term NCALL Coordinator DSHA / DDD
Initial Action Steps - Examine recent repair program statistics to assess impact program is making in Central Dover and expand outreach to homeowners
Meet with partners to determine plan to serve Central Dover and implement
Provide educational resources and training for homeowners in rehabilitation techniques, homeownership responsibliites, and financial management
Consider allowing first time buyers to utilize repair funds when purchasing in Central Dover
INITIATE VOLUNTEER-BASED NEIGHBORHOOD CDHfH / MHDC / Catholic
Intermediate Term $40,000 Sponsor Organizations $200,000 DSHA / DOE $240,000
HOUSING REPAIR PROGRAM Charities
Initial Action Steps
Meet with potential partners to determine plan for going forward and implement
City of Dover / Independent
STRENGTHEN CODE ENFORCEMENT Short Term $5,000 City of Dover $0 $5,000
Consultant
Initial Action Steps
Work with city to engage an independent consulting firm to assess department efficiency and identify areas for improvement
Work with homeowners and landlords to provide education and financial incentives to maintain housing units
City will be notified by DHA and DSHA when a housing unit or property fails a Section 8/Voucher housing inspection
Short Term / Intermediate City of Dover / NCALL / DSHA /
EXPLORE WAYS TO BOOST HOMEOWNERSHIP $25,000 City of Dover $250,000 $275,000
Term Employers
Initial Action Steps
Bringing together all parties to brainstorm on methods of boosting homeowneship such as employer assisted housing, incentives, and education and come up
with an implementation plan.
Recruit from existing renters and workers commuting to Central Dover and provide homebuying education and financial incentives.
6. SUPPORT NEW HOUSING AND MIXED USE DEVELOPMENT
Estimated Non -
Recommendation Timeframe Responsibility / Partners Source of Funds Estimated Capital Costs Source of Funds Total Costs
Capital Costs
ENCOURAGE GREATER ZONING FLEXIBILITY TO City of Dover / Planning / DDP /
Short Term $5,000 City of Dover $0 $5,000
ENABLE INFILL HOUSING DEVELOPMENT NCALL
Initial Action Steps
Develop zoning overlay for Downtown Redevelopment District to allow condominiums and townhouse styles
Allow some flexibility in setbacks and block standards for architectural and design elements that compliment area
Engage neighborhood residents to share ideas for design and neighborhood standards in Central Dover
FACILITATE PARCEL ASSEMBLY AND City of Dover / Planning / DDP / City Of Dover/DSHA/
Intermediate Term $40,000 $500,000 HDF/FHLB/Foundations $540,000
REDEVELOPMENT NCALL DDD
Initial Action Steps
Explore land banking and land trust options for assembling parcels and redevelopment efforts
Meet with Diamond State Community Land Trust to explore what is possible
Establish a parcel assembly process and make lots available for development
EVALUATE WAYS OF PROVIDING FINANCIAL City of Dover / Planning / DDP /
Short Term $5,000 City of Dover/ DDP $0 $5,000
INCENTIVES FOR DEVELOPMENT NCALL
Initial Action Steps
City consider waiving impact fees, lowering permitting fees, and real estate taxes (PILOT) for developers of new housing and especially affordable housing
68 RESTORING CENTRAL DOVER
Page 279
NCALL / CDhfH/ MHDC / DIMH / HDF/ FHLB/ DDD / CDFIs
EXPAND ACCESS TO AFFORDABLE HOUSING Intermediate Term $100,000 City of Dover/ DDP $12,000,000 $12,100,000
DHA / City of Dover / Banks
Initial Action Steps
Recuit and select housing developers to repair and to build new affordable and market-rate housing for homeownership and rental housing
Secure capital for projects.
Undertake predevelopmenT activiites and startthe development process.
PROVIDE ASSISTANCE IN ACTIVATING UPPER
Long Term City of Dover / DDP / NCALL $5,000 City of Dover/ DDP $100,000 DSHA/ DDD / CDFIs $105,000
STORIES ALONG LOOCKERMAN STREET
Initial Action Steps -- Research exisiting, successful programs
Pilot financial assistance programs to assist businesses and building owners to enact façade improvements and repairs to help attract residential tenants
Improvements will provide incentives for upper floor renters such as lower utility costs, increased security and other amenities
EXPLORE OPPORTUNITIES TO CREATE STUDENT Wesley College / City of Dover /
Intermediate Term $25,000 Wesley College $5,000,000 Wesley College/ Lenders $5,025,000
HOUSING OPTIONS OFF CAMPUS DDP
Initial Action Steps
Engage Wesley, City, and DDP to develop list of housing options for students and faculty within Central Dover
Explore off-campus mixed use student housing options linking the campus to Loockerman Street.
Develop a plan.
7. ENCOURAGE REINVESTMENT IN COMMERCIAL CORRIDORS
Estimated Non -
Recommendation Timeframe Responsibility / Partners Source of Funds Estimated Capital Costs Source of Funds Total Costs
Capital Costs
BUILD AND EXPAND ON MARKETING/BRANDING
Short Term / Intermediate Downtown Dover Partnership / DDP / DDO/ Kent Co.
EFFORTS FOR THE LOOCKERMAN STREET $25,000 $0 $25,000
Term Black Chamber Tourism
CORRIDOR AND CENTRAL DOVER
Initial Action Steps
Review, revise and implement current Downtown Marketing Plan with updated marketing information/materials tailored to potential investors and small
business inquiries.
Recruit new retail and businesses to locate in Downtown Dover
DDP
Downtown Dover Partnership / DDP/ City of Dover / City of Dover
ACTIVATE VACANT STOREFRONTS Short Term $25,000 $125,000 $150,000
Black Chamber / City of Dover Greater Kent Committee Greater Kent
Committee
Initial Action Steps - Coordinate the implementation of creative work by area youth and displays by nonprofit organizations in the vacant store fronts.
Encourage pop-up stores and incubator businesses by providing free rent incentives
ADDRESS CONCENTRATED LOITERING Short term City of Dover / Dover PD / DDP $5,000 City of Dover/DDP $0 $5,000
Initial Action Steps
Revisit licensing requirements and zoning restrictions as well as a direct approach to nuisance business owners about ways to change their business' image.
EXPAND SMALL BUSINESS DEVELOPMENT Downtown Dover Partnership /
PROGRAMS FOR NEW AND EXISTING BUSINESS Intermediate Term Black Chamber / City of Dover / $60,000 State of DE $400,000 DDP/ DDO/FSCLF/ DDD $460,000
OWNERS FSCLF
Initial Action Steps - Continue the implementation of Downtown Dover Partnership Technical Assistance Program (Small Business Development
Workshops, Intake Assessment, Loan Programs, incentives, and space referrals)
Examine and pilot other possible programs that could be implemented.
DDP/ City of Dover/
RECRUIT MAJOR LOCAL EMPLOYERS TO ESTABLISH Downtown Dover Partnership / Greater Kent Committee/
Intermediate Term $10,000 $0 $10,000
SATELLITE OFFICES ON COMMERCIAL CORRIDORS Black Chamber / City of Dover DEDO/ Central DE
Chamber of Commerce
Initial Action Steps - Implement a recruitment initiative focusing on relocating smaller operations and targeting specific, mid-size available and/or vacant office
spaces within the downtown corridor
IMPLEMENTATION APPROACH 69
Page 280
8. FOCUS ON ECONOMIC DEVELOPMENT AND INCLUSION
Estimated Non -
Recommendation Timeframe Responsibility / Partners Source of Funds Estimated Capital Costs Source of Funds Total Costs
Capital Costs
Downtown Dover Partnerships /
Central Delaware
DEVELOP A COMPREHENSIVE WORKFORCE Black Chamber / City of Dover /
Intermediate Term $100,000 Chamber of $0 $100,000
DEVELOPMENT STRATEGY Greater Kent Committee/ State of
Commerce/DEDO
Delaware
Initial Action Steps - Explore potential pilot programs such as "Ice House" Entrepreneurship Program and Small Business Development Program Phase I
Implement a pilot program
Downtown Dover Partnerships /
COMPLETE ECONOMIC INCLUSION STUDY Intermediate Term $20,000 City of Dover/ DEDO $0 $20,000
Black Chamber / City of Dover
Initial Action Steps - Implement recommendations from study that is presently underway upon approval of committee
TOTAL COSTS $21,070,000
70 RESTORING CENTRAL DOVER
Page 281
3 AN INTEGRATED PUBLIC REALM AND
INFRASTRUCTURE
9. IMPROVE TRANSPORTATION INFRASTRUCTURE
Estimated Non-
Recommendation Timeframe Responsibility / Partners Source of Funds Estimated Capital Costs Source of Funds Total Costs
Capital Cost
Intermediate DelDOT, City of Dover,
EXPAND AND ENHANCE TRANSIT SERVICES $20,000 DelDOT $0 $20,000
Term Steering Committee
Initial Action Steps
Learn what transportation studies have been done for the plan area and if needed, request that an indepth transportation accessibility study for
Central Dover be completed
Advocate for better bus routes and better times of operations to serve Central Dover with DelDOT
Change name of bus route 109 to Central Dover
Intermediate DelDOT, City of Dover,
IMPROVE BUS STOPS AND TRANSIT DEPOT $10,000 DelDOT / City of Dover $750,000 DelDOT / City of Dover $760,000
Term Steering Committee
Initial Action Steps: Meet with the community to determine placement of additional bus shelters.
Construct additional bus shelters within the target area.
Improve the Dover Transit Center with seating, shelter, public rest rooms and real-time schedule displays
ADVOCATE FOR A REGIONAL TRANSIT CONNECTION Steering Committee,
Long Term $50,000 DelDOT / Federal Govt $0 $50,000
STUDY DelDOT/ DDO/ CDCC
Initial Action Steps
Initiate conversation with DelDOT regarding status of study regarding the feasiblity of a commuter rail services from Wilmington to Dover
Examine feasibility of additional bus service from Dover to other DE destinations
DE Dept. of Social Service,
WORK TO SUBSIDIZE YOUTH AND FAMILY TRANSIT DE Dept. of Social Services / DE Dept. of Social Services /
Long Term Dept. of Labor, DelDOT, $10,000 $150,000 $160,000
ACCESS DelDOT DelDOT
Steering Committee
Initial Action Steps
Examine other subsidized transit programs for low-income families and youth
Seek ways to reduce the cost to low-income riders in Central Dover and implement a process with the State Social Service Dept. and Dept. of Labor
to reduce bus transportation costs for Central Dover residents.
BUILD ON EXISITING BIKE INFRASTRUCTURE Long Term DelDOT, City of Dover $20,000 DelDOT, City of Dover $2,000,000 $2,020,000
Initial Action Steps
Support the proposed network of exisiting and improvement ideas for the bicycle network in Central Dover, especially the enhanced through-access
on Route 8 and Loockerman Street.
Examine the possiblities for bike lanes such as the right-of-ways on Route 8 for a separated bicycle infrastructure as well as a North - South bicycle
route through Dover
IMPROVE PEDESTRIAN CONNECTIVITY AND Intermediate
City of Dover and Owners $5,000 City of Dover $500,000 City of Dover and homeowners $505,000
INFRASTRUCTURE Term
Initial Action Steps
Repair all broken and eroding sidewalks in Central Dover; widen where possible
CONDUCT A COMPREHENSIVE PARKING STUDY FOR
Short Term City of Dover / DDP $50,000 City of Dover / DDP $0 $50,000
CENTRAL DOVER
Initial Action Steps
Examine the parking study conducted by the City of Dover/DDP to determine if the allocation and number of parking spaces for business employees
vs customers is adequate
Conduct another study if necessary and implement recommendations such as developing a map of the parking areas, a parking ap and/or electric
signage.
IMPLEMENTATION APPROACH 71
Page 282
10. ENHANCE OPEN SPACES AND EXPAND GREEN INFRASTRUCTURE
Estimated Non-
Recommendation Timeframe Responsibility / Partners Source of Funds Estimated Capital Costs Source of Funds Total Costs
Capital Cost
Intermediate City Dept. of Parks and
DEVELOP PROGRAMMED RECREATION SPACES $20,000 State and City $250,000 State and City $270,000
Term Recreation
Initial Action Steps
Examine existing and other options for recreational spaces in Central Dover for best use according to community needs
Upgrade, and make the existing parks in the plan area accessible and user friendly
STRATEGICALLY DEVELOP POCKET PARKS ON Intermediate WFRF/DDP / City and property
DDP, City OF Dover $25,000 $250,000 State and City /DDP $275,000
VACANT LOTS Term owners
Initial Action Steps
Create pocket parks where vacant land exists that could be used for recreation, relaxing or community gardens.
CREATE A WEST LOOCKERMAN GATEWAY PARK Long Term City of Dover $5,000 Owner and City of Dover $50,000 Owner and City of Dover $55,000
Initial Action Steps
Meet with the site's owner
Develop plan for the park and construct the park
IDENTIFY NEIGHBORHOOD BLOCKS FOR PLAY Residents / Steering
Short Term $10,000 WFRF/NeighborWorks $0 $10,000
STREET DESIGNATION Committee
Initial Action Steps
Meet with the residents to identify the streets and best times during the year to close off a street as a play street
Work with the City to determine the procedure for turning a street into a play street during summer months
Establish the procedure
Establish and publicize the schedule or calendar of when certain blocks of each street would be a play street
INTEGRATE GREEN STORMWATER MANAGEMENT
Long Term City of Dover / DNREC $10,000 State and City of Dover $0 $10,000
INFRASTRUCTURE ON WATER STREET
Initial Action Steps
Contact the City to learn what the plans are for stormwater improvements along Water Street and advocate for the integration of green stormwater
management
Total Costs $4,185,000
72 RESTORING CENTRAL DOVER
Page 283
APPENDIX B:
EXISTING
CONDITIONS OUR VISION FOR VITALITY
Page 284
74 RESTORING CENTRAL DOVER
Page 285
EXISTING CONDITIONS APPENDIX: CENSUS DATA 75
Page 286
76 RESTORING CENTRAL DOVER
Page 287
EXISTING CONDITIONS APPENDIX: CENSUS DATA 77
Page 288
78 RESTORING CENTRAL DOVER
Page 289
EXISTING CONDITIONS APPENDIX: CENSUS DATA 79
Page 290
80 RESTORING CENTRAL DOVER
Page 291
EXISTING CONDITIONS APPENDIX: CENSUS DATA 81
Page 292
82 RESTORING CENTRAL DOVER
Page 293
EXISTING CONDITIONS APPENDIX: OTHER DATA SOURCES 83
Page 294
84 RESTORING CENTRAL DOVER
Page 295
EXISTING CONDITIONS APPENDIX: OTHER DATA SOURCES 85
Page 296
86 RESTORING CENTRAL DOVER
Page 297
EXISTING CONDITIONS APPENDIX: OTHER DATA SOURCES 87
Page 298
88 RESTORING CENTRAL DOVER
Page 299
EXISTING CONDITIONS APPENDIX: OTHER DATA SOURCES 89
Page 300
90 RESTORING CENTRAL DOVER
Page 301
EXISTING CONDITIONS APPENDIX: OTHER DATA SOURCES 91
Page 302
92 RESTORING CENTRAL DOVER
Page 303
EXISTING CONDITIONS APPENDIX: OTHER DATA SOURCES 93
Page 304
94 RESTORING CENTRAL DOVER
Page 305
EXISTING CONDITIONS APPENDIX: PHYSICAL SURVEY 95
Page 306
96 RESTORING CENTRAL DOVER
Page 307
EXISTING CONDITIONS APPENDIX: PHYSICAL SURVEY 97
Page 308
98 RESTORING CENTRAL DOVER
Page 309
EXISTING CONDITIONS APPENDIX: PHYSICAL SURVEY 99
Page 310
100 RESTORING CENTRAL DOVER
Page 311
EXISTING CONDITIONS APPENDIX: RESIDENT SURVEY 101
Page 312
102 RESTORING CENTRAL DOVER
Page 313
EXISTING CONDITIONS APPENDIX: RESIDENT SURVEY 103
Page 314
104 RESTORING CENTRAL DOVER
Page 315
EXISTING CONDITIONS APPENDIX: RESIDENT SURVEY 105
Page 316
106 RESTORING CENTRAL DOVER
Page 317
EXISTING CONDITIONS APPENDIX: PUBLIC OPEN HOUSE 107
Page 318
108 RESTORING CENTRAL DOVER
Page 319
EXISTING CONDITIONS APPENDIX: PUBLIC OPEN HOUSE 109
Page 320
110 RESTORING CENTRAL DOVER
Page 321
EXISTING CONDITIONS APPENDIX: PUBLIC OPEN HOUSE 111
Page 322
112 RESTORING CENTRAL DOVER
Page 323
EXISTING CONDITIONS APPENDIX: PUBLIC OPEN HOUSE 113