This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
6 pages have little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
SAFETY ADVISORY AND
TRANSPORTATION COMMITTEE
AGENDA
AUGUST 25, 2014 - 4:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate times. When
possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us) should
you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Proposed Ordinance #2014-21 Amending Chapter 46 - Fire Prevention and Protection, Article I - In
General, Section 46-4 - Impact Protection of Natural Gas and LP Gas Devices
(Sponsors: Hutchison and Mullaney)(Staff recommends adoption of the ordinance)
2. Prioritization of City of Dover State Capital Transportation Program (CTP) Projects
(Staff recommends approval of the recommended priority ranking for the coming year)
3. Debriefing/Post-Mortem on Firefly Music Festival (Presentations by the Department of Planning and
Inspections and the Dover Police Department)
(Committee action not required)
4. Update - Dover High School Construction
(Committee action not required)
5. Briefing on Delaware Department of Transportation (DelDOT) Projects
(Committee action not required on the items listed below)
A. Garrison Oak Connector Road
B. Construction of Sidewalks within the Walk Zone of the New Dover High School
C. Route 8/Hazlettville Road Connector
D. US Route 13 Sidewalk Construction
E. Crawford Carroll Avenue Extension
F. Kenton Road Corridor Upgrades
G. Kings Highway/Route 13 Intersection Improvements
H. US Route 13 Service Road Corridor
I. Transportation Improvement District
6. Adjournment by 4:50 p.m.
/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Agendas\2014\08-25-2014 SA&T.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE
THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
ACTION FORM
PROCEEDING: Safety Advisory and Transportation Committee
DEPARTMENT OF ORIGIN: Planning & Inspections DATE SUBMITTED: August 18, 2014
PREPARED BY: Ann Marie Townshend, AICP, Director of Planning and Community Development/Tim
Mullaney, Jr., Fire Marshal
SUBJECT: Ordinance #2014-21 Amending Chapter 46 – Fire Prevention and Protection, Article I – In
General, Section 46-4 – Impact Protection of Natural Gas and LP Gas Devices
REFERENCE: Dover Code, Chapter 46 – Fire Prevention and Protection
RELATED PROJECT: N/A
APPROVALS: N/A
EXHIBITS: Draft Ordinance
EXPENDITURE REQUIRED: N/A
AMOUNT BUDGETED: N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: First Reading on September 8, 2014; Final Reading and Adoption on September 22, 2014
RECOMMENDED ACTION: Staff recommends approval of the proposed ordinance.
BACKGROUND AND ANALYSIS
The purpose of the proposed ordinance is to clarify the standards for impact protection surrounding natural gas
and liquid propane gas devices. Currently the code does not specify the standards, specifically dimensions and
color, for bollards installed to protect natural gas and liquid propane gas devices. The standards in the proposed
ordinance are consistent with the direction provided by the Fire Marshal’s Office when questioned about impact
protection. Formally adopting the standards into code will reduce potential for confusion about requirements.
Page 3
CITY OF DOVER PROPOSED ORDINANCE #2014-21
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL
2 MET:
3 That Chapter 46 - Fire Prevention and Protection, Article I - In General, Section 46-4 - Impact Protection
4 of Natural Gas and LP Gas Devices of the Dover Code be amended by deleting the text indicated in red
5 strikeout and inserting the bold, blue text, as follows:
6 Sec. 46-4. Impact protection of natural gas and LP gas devices.
7 All natural gas and LP gas installations shall be installed per adopted NFPA and International codes, with
8 the following amendments:
9 (1) Defined. The term "impact protection" shall mean any bollards, walls, concrete barriers or other
10 devices, subject to the approval of the fire marshal, used to stop vehicles or equipment in motion.
11 (2) When required. The installation of natural gas and LP gas meters, regulators, valves, and LP gas
12 bottles shall be protected from impact damage by impact protection. Natural gas and LP gas meters,
13 regulators, and valves located inside structures shall have impact protection, except when located
14 in separate protected utility rooms. The Fire Marshal and/or Chief Building Inspector shall
15 reserve the right to apply this section whenever it is deemed necessary to provide impact
16 protection to address a life or fire hazard.
17 (3) Responsibility. It shall be the responsibility of the property owner to ensure that natural gas
18 and LP gas meters, regulators, and valves are protected in accordance with these regulations.
19 (3) Dimensions of Bollards. Bollards shall be a minimum of 6 inch diameter filled with concrete.
20 The bollard shall be set into the ground at a depth of at least 36 inches (3ft) embedded in
21 concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
22 inches (4ft) in height above the finish grade elevation. Any deviation of the stated requirements
23 must be approved by the Fire Marshal and/or Chief Building Inspector. The above dimensions
24 shall serve as the requirement for installation; however the Fire Marshal and/or Chief
25 Building Inspector shall have the authority to require more stringent dimensions to fit the
26 needs of devices warranting impact protection.
27 (4) Color of Bollards. Bollards should be of the following colors; yellow, amber or orange. All
28 colors shall be of fluorescent or have a reflective coating. Any deviation of the stated
29 requirements must be approved by the Fire Marshal and/Chief Building Inspector.
30 (5) Responsibility. It shall be the responsibility of the property owner and/or contractor for the
31 new installation to ensure that natural gas and LP gas meters, regulators, and valves are
32 protected in accordance with these regulations.
33 ( 4 6) Compliance period. All new construction projects shall comply with the provisions of this section.
34 All existing multiple dwellings, schools, nursing homes, hospitals, and day care centers shall be
35 protected in accordance with this section. All other existing structures shall be protected when
36 deemed a life or fire hazard by the fire marshal.
37 ( 5 7) Exemptions. Single-family homes, including townhouses, duplexes, and manufactured housing,
38 except where natural gas and LP gas devices are located directly in front of head-in parking spaces
39 and driveways, and where the fire marshal deems that impact protection is not necessary, shall be
40 exempt from this section.
41 ADOPTED: *
42 S:\ORDINANCES\2014\DRAFT\Ordinance #2014-21 Amending Chapter 46 -Fire Prevention and Protection.wpd
Page 4
Proposed Ordinance #2014-21 - Chapter 46 - Fire Prevention and Protection Page 2
43 SYNOPSIS
44 The proposed ordinance clarifies the standards for impact protection surrounding natural gas
45 and liquid propane gas devices. Currently the code does not specify the standards,
46 specifically dimensions and color, for bollards installed to protect natural gas and liquid
47 propane gas devices. The standards in the proposed ordinance are consistent with the
48 direction provided by the Fire Marshal's Office when questioned about impact protection.
49 Formally adopting the standards into code will reduce potential for confusion about
50 requirements.
51 (SPONSORS: HUTCHISON AND MULLANEY)
52 Actions History
53 08/25/2014 - Scheduled for Introduction at Safety Advisory and Transportation Committee
Page 5
MEMORANDUM
City of Dover
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7010 Fax: 302.736.4217
Date: August 19, 2014
To: Safety Advisory and Transportation Committee
From: Ann Marie Townshend, AICP, Director of Planning & Community Development
Scott D. Koenig, P.E., City Manager
RE: 2014 Transportation Prioritization
Each year, the City Council develops a list of transportation priorities and shares these priorities with the
Secretary of Transportation for consideration as the Department of Transportation develops the State’s
Capital Transportation Plan. We have reviewed the priorities approved in September 2013 by City
Council, and we recommend the following priority ranking for the coming year, which is the same as the
prior year’s ranking.
1. Garrison Oak Connector Road – Due to the increased activity and interest in the Garrison Oak
Technical Park, the planning and construction of this connection to Delaware Route 1 is
increasingly important.
2. Construction of Sidewalks within the Walk Zone of the New Dover High School – With the
expected opening of the new Dover High School in Fall 2014, the critical sidewalk gaps that
were identified in the Dover High Pedestrian Study performed by the Dover/Kent County MPO
become a priority. The critical gaps that are of highest priority to the City and most critical in
providing safe access to the school are listed below:
a. Mifflin Road
b. South Side of Route 8 West of Mifflin Road
c. Kenton Road (must be coupled with Kenton Road Corridor Upgrades)
3. Route 8/Hazlettville Road Connector – This is planned to be a north/south access road that was
identified in the Delaware 8 Concept Plan and Operations Study. With the construction of the
new Dover High School, the construction of this connection is important to providing access to
the school without causing additional burden on other roads in the area.
4. US Route 13 Sidewalk Construction – Construction of sidewalks along US 13 continues to be
a priority.
5. Crawford Carroll Avenue Extension – The extension of Crawford Carroll Avenue south
toward the Delaware State University Campus becomes a more critical priority with Delaware
Page 6
MEMO 2
State University’s lease of the Sheraton Hotel property. The extension of the Crawford Carroll
Avenue will help avoid use of US Route 13 for local trips between the Sheraton property and the
Delaware State University Campus.
6. Kenton Road Corridor Upgrades – Upgrading Kenton Road, including the addition of
sidewalks along the road, continues to be a priority for the City.
7. Loockerman Street/Forest Street Improvements – This project has been a priority for the City
to help spur redevelopment and improved traffic flow on the west side of Dover. It was initially
identified in the West Side Redevelopment study performed in 2001.
8. Kings Highway/Route 13 Intersection Improvements – The intersection of Kings Highway,
US Route 13, and White Oak road needs improvement to meet an acceptable level of service
standard. The current condition of the intersection hinders redevelopment of properties in this
vicinity.
9. US Route 13 Service Road Corridor – The construction of service roads along US Route 13 is
a project that will help to alleviate congestion on US Route 13.
10. College Road Corridor Upgrades – This project is intended to upgrade College Road to
include sidewalks and other road improvements.
In addition to these projects, the City is also in support of projects to improve the pedestrian and bicycle
friendliness of Dover. The Capital City Trail project is currently funded and under construction. This
provides a vital link in the City’s off-road infrastructure, contributing to transportation, recreation and
fitness opportunities. The Dover/Kent County MPO is currently leading the development of bicycle and
pedestrian plans for the City of Dover. Following the completion of these documents, the City will be
able to offer a prioritization of bicycle and pedestrian projects within the City of Dover.
We look forward to discussing this prioritization with the Committee on August 25th.
Page 7
MEMORANDUM
Department of Planning & Inspections
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
Date: August 19, 2014
To: Safety Advisory and Transportation Committee
From: Ann Marie Townshend, AICP
RE: Firefly Music Festival Post Event Report – Department of Planning and Inspections
From June 18 through June 22, 2014, Dover International Speedway hosted the third annual Firefly Music Festival. Red
Frog Entertainment and Dover International Speedway have agreed to continue the event for ten more years according to
the reports in the media. This report is offered as a summary of the Department of Planning and Inspections’ planning and
operations related to the event and to help identify areas where we need to improve in future years.
Dover International Speedway submitted a site plan and information binder showing the location of stages and tents
with a Special Event Permit application in late May. This book had all the specifications for the stages and the
occupant loads of the tents. The binder and site plan were reviewed by the Fire Marshal’s Office. A growing
number this year’s activities associated with the Festival were in the unincorporated Kent County (including the
event main stage), and the State Fire Marshal received the same information and they reviewed it as well. City staff
performed a walk through on Tuesday, June 17th, before the event started. Assembly inspections on stages were not
performed by City staff, but were overseen under the authority and management of Dover International Speedway
and Red Frog. The information binder included the stage specifications and engineering reports.
The City issued a special event permit for the music festival, but this permit did not address festival hours. This year, the
City received numerous complaints from residents about the volume of the music and the late hours during which music
was played. This issue will need to be addressed in a code amendment to cover special events.
During the event, the Fire Marshal’s Office performed campground checks during the afternoon and evening. On
Friday evening, the Fire Marshal found a camping area on the Dover International Speedway property that had not
received a camping permit from the City. The camping area did not allow for adequate ingress, egress and access to
individual sites. City staff talked to Dover International Speedway personnel who indicated that this was the result
of the push to get cars off the road. The situation could not be remedied for this year’s event, but all parties agreed
that this will not be permitted in the future.
For the most part, the event ran smoothly from the perspective of the Fire Marshal’s Office and life safety checks.
There was an incident late on Sunday, June 22nd, where someone was burned while lighting a cigarette after spraying
bug spray. The paramedics and Fire Marshal responded to this call.
In last year’s report, we reported that there was a gap in the Zoning Ordinance, as it relates to this event. Staff had hoped
to develop an ordinance to address this prior to the 2014 festival but due to staffing constraints was unable to complete
this. Based on this year’s experience, we will need to complete a code amendment with appropriate public review and
input by early 2015 to ensure that the event continues to run smoothly. We have begun work to develop an ordinance that
Page 8
MEMO 2
would address Temporary Outdoor Events. The current outline of a proposed ordinance would address both large and
small temporary events, and will incorporate hours, camping, temporary signage, and the many other issues that are not
clearly addressed in our current code.
This year, the business licensing relating to vendors at the event was simplified by using the Open Market Operator
license. Dover International Speedway was responsible for collecting fees from the vendor, and the business license
was paid for by Dover International Speedway based on the number of vendors. While this business license
classification yields less revenue, it also requires less staff time, both during normal working hours and as overtime,
and it significantly reduces confusion and frustration on the part of Dover International Speedway and the event
organizers.
The Planning and Inspections Department continues to have concern over the split nature of the event between
jurisdictions. We have expressed to Dover International Speedway that annexation of Lots 8 and 9 (both east of
Persimmon Tree Lane/Leipsic Road) would help to eliminate confusion over who is responsible for what areas. The
current patchwork nature of the City boundary causes a bit of confusion, specifically as it relates to Fire Marshal
jurisdiction.
Page 9
Presented by Chief Paul M. Bernat
Safety Advisory & Transportation Committee Meeting
August 25, 2014
Page 10
Dover Police Mission Statement During Firefly
To secure and deploy the law enforcement resources necessary to protect and serve the
interest of the citizens and City of Dover, while preserving the peace and ensuring that
pedestrian and vehicular traffic flow in an orderly and systematic manner during the four
days involving the Firefly Music Festival Weekend.
Dover Police Objectives During Firefly
To maintain a professional, courteous presence during all activities associated with
the event.
Identify, control and/or remove conditions that could threaten the public safety.
Practice pro-active policing ideas while addressing any criminal activity with the
appropriate law enforcement response.
Network with and employ the assistance of other law enforcement agencies as
needed to ensure public safety and smooth flow of traffic.
Page 11
Elevated Threat Level Instructions
Reflective Traffic Vest Policy
Strict Enforcement Actions
Support Dover Downs Security Operations
Officer Instructions
Command Post/Secondary Public Safety Compound
Communications
Logistics
Intelligence
Page 14
FRIDAY AFTERNOON
Page 15
POLICE AGENCIES INVOLVED:
Dover Police Department - As the primary law enforcement agency, we managed and deployed other law enforcement
agencies as needed and retained law enforcement management responsibility for events that occurred in the jurisdiction of
the Dover Police Department. We were also utilized to monitor, direct, and control traffic (pedestrian and vehicle) ingress
and egress to the event in conjunction with the Delaware State Police, Delaware Department of Transportation and Dover
Downs International Speedway and provided law enforcement/security at the venue.
Dover Police Department Drug, Vice, Organized Crime Unit (DVOC) – was utilized to assist with security issues in the
venue and the parking areas surrounding the venue. DVOC officers were used to identify any potential drug/crowd related
problems. DVOC officers also targeted illegal T-shirt and wristband sales.
Delaware State Police - As the secondary law enforcement agency, they managed, deployed and retained law enforcement
management responsibility for events that occurred in their jurisdiction. They were also utilized to monitor, direct, and
control traffic (pedestrian and vehicle) ingress and egress to the event in conjunction with the Dover Police Department,
Delaware Department of Transportation and Dover Downs International Speedway and provided law enforcement/security at
the venue.
Dewey Beach Police Department - was utilized to direct and control traffic ingress and egress for the event as well as patrol
the parking lot and camping grounds.
Smyrna Police Department - was utilized to direct and control traffic ingress and egress for the event, patrol the parking lot
and camping grounds and the Main Entrance.
Capitol Police Department - was utilized to direct and control traffic ingress and egress for the event as well as patrol the
parking lot, festival grounds and camping areas.
Georgetown Police Department – was utilized to conduct security at festival grounds cash house.
Seaford Police Department - was utilized to direct and control traffic ingress and egress for the event as well as patrol the
parking lot and camping grounds.
Page 16
POLICE AGENCIES INVOLVED CONTINUED:
Felton Police Department - was utilized to direct and control traffic ingress and egress for the event as well as patrol the
parking lot and camping grounds.
Milford Police Department - was utilized to direct and control traffic ingress and egress for the event as well as patrol the
parking lot, festival grounds and camping areas.
Wyoming Police Department - was utilized to direct and control traffic ingress and egress for the event as well as patrol
the parking lot and camping grounds.
Camden Police Department - was utilized to direct and control traffic ingress and egress for the event.
Cheswold Police Department - was utilized to direct and control traffic ingress and egress for the event.
Clayton Police Department-was utilized to direct and control traffic ingress and egress for the event.
Dagsboro Police Department-was utilized to direct and control traffic ingress and egress for the event.
Selbyville Police Department-was utilized to direct and control traffic ingress and egress for the event.
Delaware State Police EOD – was utilized to respond to and deal with any suspicious packages or items found or left in
and around the grounds of the festival area and as well as Dover Downs property.
Delaware Alcohol Tobacco Enforcement (DATE) – staffed the event and provided uniformed and non-uniformed staff to
monitor DATE compliance and assist with the interior event security and U/C operations.
Delaware Joint Terrorism Task Force (JTTF) – was utilized to provide undercover operations dealing with security issues
in the parking areas and inside of the venue.
Page 17
THURSDAY TRAFFIC
Page 18
3,378 Man Hours Were Used
Complaints Throughout the Six Day Period.
Vehicle Theft 3
Trespass 1 Firefly
Parking Violation 1
Assault 1
911 Disconnect 1
Traffic 3
Identity Theft 1
Assist Other Agency 2
EMD 1
Solicitation 2
Disorderly Groups/Persons 9
Drugs 6
Domestic 2
Fights 3
Overdose 1
Missing Person 5
MVA's 7
Noise Violation 3
Fire 1
Public Assist 2
Fraud 4
Suspicious Package 2
Suspicious Persons/Vehicles 4
Found Property 5
Thefts 9
Resisting Arrest 2
Wellness Checks 6
0 2 4 6 8 10
Page 19
Saturday Evening
SATURDAY AFTERNOON
Page 20
ITEMS REQUIRING IMPROVEMENT:
At the conclusion of the Firefly Music Festival, it was determined that there were
several issues that needed to be addressed, dealt with, and corrected for the 2015
Firefly Festival. Some of the issues that arose during the weekend which will be
addressed in the upcoming meetings are as follows:
Red Frog/ DIS need to hire undercover officers to work the event. The Drug, Vice and
Organized Crime Unit was not hired by Red Frog/DIS for 2014. They were present
however and arrested three subjects for a total of 10 drug charges and seized LSD,
Cocaine, Ecstasy and Oxycodone along with cash proceeds. They also issued 11 DCO’s
for soliciting without a permit and seized approximately 300 counterfeit T-Shirts.
They only scratched the surface by their own admission and requested additional
manpower for 2015.
Red Frog/DIS needs to man the toll booths 24 hours a day. A lot of travelers arrived in
the overnight hours and backed traffic onto US 13 while waiting for the toll booths to
open.
Page 21
ITEMS REQUIRING IMPROVEMENT CONTINUED:
Red Frog/DIS needs to limit Hub Concerts to FIREFLY ticket holders only.
Opening it to the public allowed for local trouble makers to attend and become
unruly and disorderly.
Need to hard close Leipsic Road and Persimmon Tree Lane on Thursday morning.
The pedestrians overtook the roadway and were intermingled with vehicle traffic
creating a serious safety hazard.
Need to establish a well-defined pedestrian cross walk between the main Entrance
and Lot 12.
Pedestrian walking areas on Persimmon Tree Lane need to be clearly defined with
hard barriers to separate them from Emergency/Event vehicle traffic.
Working Patrol Officers need to be provided with detailed maps to assist them
when responding to complaints at the event. Working Patrol Officers request a
pre-determined meet location and transportation (i.e. Golf Cart) for Officers
responding into the Festival Grounds to assist Extra Duty Officers.
Page 22
Sunday’s reduction in manpower needs to be reviewed prior to 2015 as it left the
officers shorthanded.
Need better lighting on the roadways and the bridge to enhance security and
prevent a vehicle/pedestrian collision.
Need trash cans placed on the bridge and roadways. Attendees threw a lot of
debris on the bridge and roadway which created a walking hazard.