Page 1
UTILITY COMMITTEE
AGENDA
JUNE 9, 2014 - 6:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Annual Engineering Consultant's Report on the Operation and Maintenance of the Electric
System - Fiscal Year 2013
(Staff recommends acceptance of the report)
2. TEA/NAES Report (April)
(Staff recommends acceptance of the report)
3. Updates
(Committee action not required on the below items)
A. Garrison Oak Technical Park Project Updates
a-1. City Infrastructure
a-2. Calpine Energy Center
a-3. Dover Sun Park
B. Progress Update on Purchase Power Agreement
4. Adjournment by 7:00 p.m.
/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Agendas\2014\06-09-2014 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE
THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
Annual Engineering Consultant’s Report
on the
Operation and Maintenance
of the Electric System
Fiscal Year 2013
City of Dover, Delaware
Project No. 78609
June 2014
Page 3
Annual Engineering Consultant’s
Report
on the
Operation and Maintenance
of the Electric System
Fiscal Year 2013
prepared for
City of Dover, Delaware
Dover, Delaware
June 2014
Project No. 78609
prepared by
Burns & McDonnell Engineering Company, Inc.
Missouri City, Missouri
COPYRIGHT © 2014 BURNS & McDONNELL ENGINEERING COMPANY, INC.
Page 4
June 4, 2014
Ms. Donna S. Mitchell, CPA
Controller/Treasurer
City of Dover
5 East Reed Street
Weyandt Hall, Suite 300
Dover, Delaware 19901
RE: Annual Engineering Consultant’s Report
Project No. 78609
Dear Ms. Mitchell:
In compliance with the requirements of Section 705 and Section 504 of the City of Dover, Delaware
Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985 (Resolution),
Burns & McDonnell submits this Annual Engineering Consultant’s Report for the fiscal year ended June
30, 2013. This report summarizes our review and assessment of the City of Dover’s (City) Electric
System, its existing retail electric rates, its insurance coverage in effect, and its reserve funds. Financial,
statistical, and operating data used in preparing the report were initially reported in the City’s annual
financial statements and accounting records. Additional information was furnished by City and Electric
Division staff.
In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed assessments
of the electric generating stations and the transmission and distribution system of the City’s Electric
Division. Assessments involved interviews, observations, and review of fiscal year 2013 expenditures
and fiscal year 2014 budgets. In addition, an analysis of the balances of the Improvement and Extension
Fund as well as other funds supporting the Electric Division was performed. Burns & McDonnell also
reviewed the adequacy of revenues provided by current retail rates in relation to the requirements of the
Resolution. Finally, a high-level assessment of the City’s insurance coverage related to the Electric
Division was completed.
Based on these reviews and assessments, it is the opinion of Burns & McDonnell that the Electric System
is being operated and maintained, including replacements and upgrades as appropriate, in a manner that is
consistent with current electric utility practices. In addition, the current retail rates have provided
sufficient revenues to satisfy the debt service coverage requirement in the Resolution.
Further, it is the opinion of Burns & McDonnell that the balances in the various reserve funds maintained
by the City for the Electric Division are sufficient for their intended purposes.
9400 Ward Parkway • Kansas City, MO 64114-3319
Tel: 816 333-9400 • Fax: 816 333-3690 • www.burnsmcd.com
Page 5
We appreciate the cooperation and assistance provided by the City and the Electric Division staff in the
preparation of this report. We will be happy to discuss the report with you at your convenience.
Sincerely,
BURNS & McDONNELL
Ted J. Kelly
Principal & Senior Project Manager
Business & Technology Services
TJK/pcf
Page 6
2014 Engineering Consultant’s Report Table of Contents
TABLE OF CONTENTS
Page No.
1.0 EXECUTIVE SUMMARY ................................................................................... 1-1
1.1 Introduction .......................................................................................................... 1-1
1.2 Electric System Overview and Assessment ......................................................... 1-1
1.2.1 General Plant ......................................................................................... 1-2
1.2.2 Production Plant .................................................................................... 1-2
1.2.3 Transmission and Distribution Plant ..................................................... 1-3
1.3 Financial Assessment ........................................................................................... 1-3
1.4 Conclusions .......................................................................................................... 1-5
2.0 INTRODUCTION ............................................................................................... 2-1
2.1 Purpose of Report ................................................................................................ 2-1
2.2 Organization ......................................................................................................... 2-2
3.0 ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT .................................. 3-1
3.1 Electric System Overview.................................................................................... 3-1
3.1.1 Production Plant .................................................................................... 3-2
3.1.2 Transmission and Distribution Plant ..................................................... 3-3
3.1.3 General Plant ......................................................................................... 3-3
3.2 Electric System Assessment ................................................................................ 3-3
3.2.1 Electric Generating Stations ................................................................. 3-4
3.3 Transmission and Distribution Systems............................................................. 3-13
3.3.1 Safety .................................................................................................. 3-13
3.3.2 System Reliability ............................................................................... 3-13
3.3.3 Power Quality ..................................................................................... 3-14
3.3.4 Operations and Maintenance............................................................... 3-14
3.3.5 Design Standards and Specifications .................................................. 3-15
3.3.6 Transmission and Distribution Capital Improvements ....................... 3-15
3.3.7 Condition Assessment ......................................................................... 3-17
3.4 Conclusions ........................................................................................................ 3-18
4.0 FINANCIAL ASSESSMENT.............................................................................. 4-1
4.1 Financial Results .................................................................................................. 4-1
4.1.1 Required Revenue Level ....................................................................... 4-1
4.1.2 Electric Rates ........................................................................................ 4-1
4.1.3 Operating Results .................................................................................. 4-2
4.1.4 Adequacy of Electric Rates ................................................................... 4-6
4.2 Status of Revenue Bonds ..................................................................................... 4-7
4.3 Insurance .............................................................................................................. 4-8
4.4 Operating and Reserve Accounts ....................................................................... 4-10
City of Dover, Delaware TOC-1 Burns & McDonnell
Page 7
2014 Engineering Consultant’s Report Table of Contents
4.4.1 Electric Revenue Fund ........................................................................ 4-11
4.4.2 Electric Improvement and Extension Fund......................................... 4-12
5.0 CONCLUSIONS ................................................................................................ 5-1
City of Dover, Delaware TOC-2 Burns & McDonnell
Page 8
2014 Engineering Consultant’s Report Table of Contents
LIST OF TABLES
Page No.
Table 3-1: Year-End Plant in Service ...................................................................................... 3-1
Table 3-2: Fiscal Year 2014 Planned Capital Expenditures .................................................... 3-2
Table 3-3: FY 2013 Generating Plant Operating Statistics ..................................................... 3-6
Table 4-1: Annual Sales and Customer Accounts ................................................................... 4-3
Table 4-2: Annual Revenues and Sales Ratios ........................................................................ 4-4
Table 4-3: Revenue Margins and Unaccounted for Energy .................................................... 4-5
Table 4-4: Comparative Statement of Revenues, Expense, ..................................................... 4-6
Table 4-5: Debt Service Coverage ........................................................................................... 4-7
Table 4-6: Debt Service Schedule of Electric Revenue Bonds ............................................... 4-8
Table 4-7: Schedule of Insurance Coverage in Effect ............................................................. 4-9
Table 4-8: Reserve Account Activity and Balances .............................................................. 4-14
City of Dover, Delaware TOC-3 Burns & McDonnell
Page 9
2014 Engineering Consultant’s Report Table of Contents
LIST OF FIGURES
Page No.
Figure 2-1: Organization ........................................................................................................... 2-3
Figure 2-2: Administration ........................................................................................................ 2-3
Figure 2-3: System Operations.................................................................................................. 2-4
Figure 2-4: Electric Engineering ............................................................................................... 2-4
Figure 2-5: Electric Transmission and Distribution .................................................................. 2-5
City of Dover, Delaware TOC-4 Burns & McDonnell
Page 10
2014 Engineering Consultant’s Report Statement of Limitations
LIST OF ABBREVIATIONS
Abbreviation Term/Phrase/Name
Burns & McDonnell Burns & McDonnell Engineering Company, Inc.
City City of Dover, Delaware
DCS distributed control system
EDQP Employee Development and Qualification Program
EIA U.S. Energy Information Administration
FY Fiscal Year
GWh gigawatt-hour
I&E Fund Electric Improvement & Extension Fund
kV kilovolt
kW kilowatt
kWh kilowatt-hour
LAN local area network
McKee Run McKee Run Generating Station
MW megawatt
MWh megawatt-hour
NAES North American Energy Services Corporation
NERC North American Electric Reliability Corporation
NRG NRG Energy Center
Ohm standard unit of electrical resistance
PJM Pennsylvania New Jersey Maryland Interconnection
Report 2014 Engineering Consultant’s Report on the Operation and Maintenance of
the Electric System
Resolution Resolution Authorizing and Securing Electric Revenue Bonds, adopted
December 23, 1985
City of Dover, Delaware i Burns & McDonnell
Page 11
2014 Engineering Consultant’s Report Statement of Limitations
VanSant VanSant Generating Station
TEA The Energy Authority, Inc.
City of Dover, Delaware ii Burns & McDonnell
Page 12
2014 Engineering Consultant’s Report Statement of Limitations
STATEMENT OF LIMITATIONS
In preparation of the 2014 Engineering Consultant’s Report on the Operation and Maintenance of the
Electric System (the Report), Burns & McDonnell relied upon information provided by the City of Dover,
Delaware (the City). The information included various analyses, computer-generated information and
reports, audited financial reports, and other financial and statistical information, as well as other
documents such as operating budgets and current retail electric rate schedules. While Burns & McDonnell
has no reason to believe that the information provided, and upon which Burns & McDonnell has relied, is
inaccurate or incomplete in any material respect, Burns & McDonnell has not independently verified such
information and cannot guarantee its accuracy or completeness. In addition, Burns & McDonnell has used
the information provided to make certain assumptions with respect to conditions that may exist in the
future. While Burns & McDonnell believes the assumptions made are reasonable for the purposes of the
Report, it makes no representation that the conditions assumed will occur.
City of Dover, Delaware iii Burns & McDonnell
Page 13
1.0 – EXECUTIVE SUMMARY
Page 14
2014 Engineering Consultant’s Report Executive Summary
1.0 EXECUTIVE SUMMARY
1.1 Introduction
The 2014 Engineering Consultant’s Report on the Operation and Maintenance of the Electric System
(Report) has been prepared in compliance with the requirements of the City of Dover, Delaware
Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985 (Resolution).
Burns & McDonnell was retained as the Engineering Consultant by the City of Dover, Delaware (City) to
complete an inspection of the Electric System and prepare a report on findings. The Resolution requires
that the Engineering Consultant complete the following:
“The City covenants that it will cause the Engineering Consultants employed under the provisions of
Section 705 of this Resolution . . . to make an inspection of the Electric System at least once each
fiscal year and . . . to submit to the City Manager a report setting forth (a) their findings whether the
properties of the Electric System have been maintained in good repair, working order and condition
and whether they have been operated efficiently and economically and (b) their recommendation as
to
(i) the proper maintenance, repair and condition of the Electric System during the ensuing fiscal
year and an estimate of the appropriations which should be made for such purposes,
(ii) the insurance to be carried under the provisions of Article VII of this Resolution,
(iii) the amount that should be deposited during the ensuing fiscal year to the credit of the
Improvement and Extension Fund for the purposes set forth in Section 510 of this Article,
(iv) the extensions, improvements, renewals and replacements which should be made during the
ensuing fiscal year, and
(v) any necessary or advisable revisions of the electric rates.”
This is the eleventh annual Engineering Consultant’s Report prepared for the City by Burns &
McDonnell.
1.2 Electric System Overview and Assessment
The Electric Division served 23,446 customers at the end of fiscal year (FY) 2013, 19,993 of which were
residential customers. Four of the Electric Division customers take service from the 69-kV transmission
system. These customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG Energy
City of Dover, Delaware 1-1 Burns & McDonnell
Page 15
2014 Engineering Consultant’s Report Executive Summary
Center (NRG). NRG is an exempt wholesale generator that sells power that must be transmitted through
the City’s transmission system to third party purchasers. When the NRG plant is not operational, the
Electric Division provides power for the plant site.
1.2.1 General Plant
General plant facilities consist primarily of Electric Division administrative and operations facilities and
pollution control related equipment on McKee Run Generating Station (McKee Run) and VanSant
Generating Station (VanSant). Other types of general plant include office furniture and equipment,
transportation and power-operated equipment, and communication equipment.
Effective July 1, 2011, the City entered into an Energy Management Agreement with The Energy
Authority, Inc. (TEA) to assist the City with its energy procurement, energy sale, purchase of fuels,
establishment and management of risk policies, and the development and management of hedging
protocols and related energy procurement challenges. Headquartered in Jacksonville, Florida, TEA is a
non-profit energy manager owned by seven public utility systems operating across the nation.
1.2.2 Production Plant
The City owns two generating plants, the McKee Run and VanSant generating stations. McKee Run
consists of three steam turbine generating units with a total combined capacity of 136 megawatts (MW).
VanSant is a 39 MW simple-cycle combustion turbine unit. North American Energy Services Corporation
(NAES Corporation) operates the generating plants. The agreement between the City and NAES
Corporation has been in effect since July 1, 2006. The various systems and components of the generating
plants reviewed by the Engineering Consultant are listed below:
Major Equipment
Steam turbines/generators
Boilers and auxiliaries
Station cooling water systems
Fuel handling systems
Water treatment systems
Station electrical systems
Station control systems
General facilities
City of Dover, Delaware 1-2 Burns & McDonnell
Page 16
2014 Engineering Consultant’s Report Executive Summary
Management and Organization
Safety
Training
Staffing
Based on statements and information provided by the City, as well as the observations and reviews
performed, it is the Engineering Consultant’s opinion that the City’s power generation facilities are being
operated and maintained consistent with generally accepted electric utility practice in the United States. In
general, the performance, operation, maintenance, staff, planning, and training aspects for the McKee Run
and VanSant were found to be above average. Specifically, the generation facilities have demonstrated a
high level of availability despite the dispatching of the units primarily for peak demand.
1.2.3 Transmission and Distribution Plant
The transmission and distribution network includes 44 miles of overhead transmission lines, 0.12 miles of
underground transmission lines, 190 miles of overhead distribution lines and 268 miles of underground
distribution lines. Four Electric Division customers take service off of the 69-kV transmission system.
The following list includes areas of the transmission and distribution system that were considered and
reviewed.
System reliability
Power quality
Operations and maintenance
Design standards and specifications
Transmission and distribution improvements
It is the Engineering Consultant’s opinion that the design, construction, operation, and maintenance of the
City’s electric transmission and distribution system and the associated facilities are consistent with
current generally accepted electric utility standards. In recent years, the City has made appropriate
upgrades and improvements which the Engineering Consultant has observed while conducting the
reviews and assessments to complete the annual reports.
1.3 Financial Assessment
The level of revenues required from the retail electric rates for the Electric Division were determined
through the analysis of the financial results and net income or net margins for FY 2013. The Resolution
requires that the Electric Division maintain a debt service coverage ratio of 1.25.
City of Dover, Delaware 1-3 Burns & McDonnell
Page 17
2014 Engineering Consultant’s Report Executive Summary
Customers of the Electric Division of the City were charged for the electric service they received based
on the City’s rate schedules and contracts that were in place in FY 2013. A comprehensive cost-of-service
and rate design study was completed in 2006 and subsequent rate analyses were completed in 2007, 2008,
2012, and 2013 to examine revenue requirements and revenue generation. Specifically, the 2006 rate
study was conducted to address increased costs associated with a new power supply contract that became
effective on July 1, 2006. The rate study recommended combining a number of rate classes and
implementing rate increases on July 1, 2006. The 2006 rate study also recommended an additional
increase be implemented on January 1, 2007 to cover increased costs associated with operating the
generating station. The 2007 and 2008 rate analyses re-examined Electric Division revenues and expenses
and recognized additional revisions to power supply costs. As a result of these analyses, additional rate
increases were implemented on July 1, 2007, July 1, 2008, and July 2012. The July 2013 rate adjustments
established the rate schedules utilized by the Electric Division today.
Total energy sales increased from 710.3 GWh in FY 2012 to 723.1 GWh in FY 2013, an increase of 1.8
percent. Total revenue from sales to electric customers in FY 2013 was $88.3 million, representing a
decrease of $3.6 million from FY 2012 rate revenue of $91.9 million. In FY 2013, the average revenue
per kWh for residential customers was 14.00 cents and the system-wide average price was 12.22 cents per
kWh.
The Electric Division’s largest cost in providing electric service to its customers is the wholesale cost of
power purchased from the Pennsylvania New Jersey Maryland Interconnection (PJM) marketplace
through its energy manager, TEA. From FY 2012 to FY 2013, the cost of power increased from $58.9
million to $65.4 million. Net income decreased from $8.5 million in FY 2012 to $6.2 million in FY 2013.
The net income decrease in FY 2013 was due in large part to the increase in transfers out of the Electric
Revenue Fund.
Following is an excerpt from Section 502(c) of the Resolution.
“(c) The total amount of the Revenues of the Electric System during the preceding fiscal year shall
have been not less than the total of the following:
The Current Expenses of the Electric System during the current fiscal years shown by the Annual
Budget . . . for such fiscal year, and
City of Dover, Delaware 1-4 Burns & McDonnell
Page 18
2014 Engineering Consultant’s Report Executive Summary
One hundred twenty-five percent (125%) of the maximum amount of the Principal and Interest
Requirements for any fiscal year thereafter on account of all bonds then Outstanding under the
provisions of this Resolution.”
The Resolution requires that annual revenues of the Electric Division be no less than the total current
expenses plus 125 percent of the greatest remaining annual debt service. The Electric Division achieved
debt service coverage ratios for FY 2011, FY 2012, and FY 2013 of 5.45, 6.48, and 6.56 respectively;
therefore, the revenues generated by the current electric rates have been sufficient to meet the applicable
covenant of the Resolution.
The City maintains a comprehensive insurance program to cover varying types of liabilities, as well as
significant losses related to various Electric Division properties. It is the opinion of Burns & McDonnell
as Engineering Consultant, and not as insurance counselor, the insurance in full force and affect appears
to satisfy the requirements of Section 706 of the Resolution.
The City established the Electric Revenue Fund and the Electric Improvement & Extension (I&E) Fund to
make moneys available for specific purposes when they are needed. The following is a list of these funds’
respective cash accounts:
Electric Revenue Fund
Insurance Reserve Account
Contingency Reserve Account
Electric Rate Stabilization Reserve Account
Interest and Sinking Account
Electric Improvement and Extension Fund
Depreciation Reserve Account
Future Capacity Reserve Account
The Engineering Consultant reviewed activity information on the accounts listed above and found that the
balances in those accounts as of June 30, 2013, were consistent with the required or target balances.
1.4 Conclusions
Based on the reviews and assessments completed, it is the opinion of Burns & McDonnell that:
City of Dover, Delaware 1-5 Burns & McDonnell
Page 19
2014 Engineering Consultant’s Report Executive Summary
1. The City’s power generation facilities are being operated and maintained consistent with
generally accepted electric utility practice in the United States.
2. The design, construction, operation, and maintenance of the City’s electric transmission and
distribution system and the associated facilities are consistent with current generally accepted
electric utility standards and over the past few years, the system has been upgraded in order to
improve operation and service to customers.
3. The Electric Division capital projects included in the City’s Capital Investment Plan and the FY
2014 Operating Budget are necessary and should provide improved reliability and power quality
for the Electric System.
4. The cash balances as of June 30, 2013 for the various accounts maintained by the City for the
Electric Division appear to be sufficient for their defined purposes.
5. The insurance coverage in full force and effect as maintained by the City related to the various
assets of the Electric Division appears to satisfy the requirements of Section 706 of the
Resolution.
6. The electric revenues generated by the City’s current retail rates are more than sufficient to fulfill
the debt service coverage requirement (125 percent of current expenses) defined in Section 502(c)
of the Resolution.
City of Dover, Delaware 1-6 Burns & McDonnell
Page 20
2.0 – INTRODUCTION
Page 21
2014 Engineering Consultant’s Report Introduction
2.0 INTRODUCTION
The City of Dover, Delaware (City) operates a municipally-owned electric utility system that served
23,446 customers within the City and surrounding areas at the end of fiscal year (FY) 2013. The service
area of the electric utility is located in central Delaware; with the City itself located approximately 70
miles south of Philadelphia, Pennsylvania.
2.1 Purpose of Report
This 2014 Annual Engineering Consultant’s Report (Report) has been prepared in compliance with the
requirements adopted December 23, 1985 of the City of Dover Electric Bond Resolution (Resolution).
Burns & McDonnell was retained by the City as the Engineering Consultant defined in Section 705 of the
Resolution, as follows.
“The City covenants that it will, for the purpose of performing and carrying out the duties imposed on
the Engineering Consultants under the provisions of this Resolution, employ an independent engineer
or engineering firm or corporation having a nationwide and favorable repute for skill and experience
in such work.”
The required scope of the Report is described in Section 504 of the Resolution, as follows.
“The City covenants that it will cause the Engineering Consultants employed under the provisions of
Section 705 of this Resolution . . . to make an inspection of the Electric System at least once each
fiscal year and . . . to submit to the City Manager a report setting forth (a) their findings whether the
properties of the Electric System have been maintained in good repair, working order and condition
and whether they have been operated efficiently and economically and (b) their recommendation as
to
(vi) the proper maintenance, repair and condition of the Electric System during the ensuing fiscal
year and a estimate of the appropriations which should be made for such purposes,
(vii) the insurance to be carried under the provisions of Article VII of this Resolution,
(viii) the amount that should be deposited during the ensuing fiscal year to the credit of the
Improvement and Extension Fund for the purposes set forth in Section 510 of this Article,
(ix) the extensions, improvements, renewals and replacements which should be made during the
ensuing fiscal year, and
City of Dover, Delaware 2-1 Burns & McDonnell
Page 22
2014 Engineering Consultant’s Report Introduction
(x) any necessary or advisable revisions of the electric rates.”
2.2 Organization
The Electric Utility Director is responsible for the overall management of the Electric Utility Division.
(The Electric Utility Director position is currently vacant.) The Electric Director oversees the day-to-day
operations of the Electric Division and manages the Division’s staff. The Director also provides oversight
of the Power Plant budget, monitors the contracts of the energy coordinator and the power generation
operator/manager, and is responsible for North American Energy Services Corporation (NAES
Corporation) contracts and oversight. The Electric Division is organized into four separate operating
sections. Descriptions of the current Electric Division sections are provided below.
Administration Section – Administration provides the overall management of the Electric Division’s
Engineering and Transmission & Distribution Sections. This section performs all planning and budgeting,
monitors all construction projects, administers all power supply and generating station operations
agreements, and coordinates with customer service and public relations for the Electric Division.
System Operations Section – System Operations is responsible for the operation of a 24/7 system
operations control center. This section was formally a part of the Electric Engineering Section, but now
has been identified as its own section comprising of the System Operators Crew Leader and the
Operators.
Electric Engineering Section – Electric Engineering provides design, specifications, construction
management, and project inspection for all capital investment projects of the Electric Division. This
section also develops and maintains maps, plans, and specifications, as well as engineering standards for
construction and maintenance of the Electric System.
Transmission & Distribution Section – Transmission & Distribution constructs, operates, and maintains
the overhead and underground electric systems and fiber optic communication facilities. This section
installs and maintains all electric metering, as well as street and security lighting. This section also
investigates and resolves customers’ power problems and oversees the work of tree trimming contractors.
Figures 2-1 through 2-4 provide organizational charts illustrating the staffing hierarchies of the various
sections in the Electric Division. The number of individuals in each position was indicated as appropriate.
Electric Division staff totaled 38 at the time the FY 2014 budget was issued.
City of Dover, Delaware 2-2 Burns & McDonnell
Page 23
2014 Engineering Consultant’s Report Introduction
The subsequent sections of the Report provide a discussion of the required reviews and inspections
conducted pursuant to Section 504 of the Resolution. Section 3 describes the assessment of the Electric
System and its condition. Section 4 presents the financial results for the Electric Division, including an
analysis of the adequacy of revenues provided by the electric rates. Section 5 summarizes the conclusions
of Burns & McDonnell regarding the operation and maintenance of the Dover Electric System.
Figure 2-1: Organization
City Manager
Electric Director
(Vacant)
Electric Transmission &
Administration (2) System Operations (5) Electric Engineering (9)
Distribution (22)
Figure 2-2: Administration
Administration
Administrative Assistant
(1)
Account Clerk II (1)
City of Dover, Delaware 2-3 Burns & McDonnell
Page 24
2014 Engineering Consultant’s Report Introduction
Figure 2-3: System Operations
Figure 2-4: Electric Engineering
City of Dover, Delaware 2-4 Burns & McDonnell
Page 25
2014 Engineering Consultant’s Report Introduction
Figure 2-5: Electric Transmission and Distribution
City of Dover, Delaware 2-5 Burns & McDonnell
Page 26
3.0 – ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
Page 27
2014 Engineering Consultant’s Report Electric System Overview and Assessment
3.0 ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
3.1 Electric System Overview
The Electric System owned by the City primarily consists of production plant, transmission plant,
distribution plant, and general plant facilities, and construction work in progress. Table 3-1 displays the
year-end balances of the various plant components for FY 2011 through FY 2013. Table 3-2 itemizes the
specific capital investment plan projects and anticipated expenditures included in the FY 2014 budget.
Table 3-1: Year-End Plant in Service
FY 2011 FY 2012 FY 2013
Capital assets, not being depreciated
Land $ 1,458,066 $ 1,458,066 $ 1,458,066
Construction in progress 424,809 789,014 1,338,909
Total capital assets, non-depreciable $ 1,882,875 $ 2,247,080 $ 2,796,975
Capital assets, being depreciated
Buildings $ 17,383,566 $ 17,456,628 $ 17,619,349
Production 63,408,937 64,610,399 65,040,049
Transmission 32,558,944 33,106,748 34,010,686
Distribution 59,824,248 60,680,365 61,752,469
Administration 1,551,280 1,634,017 1,743,754
Vehicles 622,236 640,096 625,876
Total capital assets, being depreciated $ 175,349,211 $ 178,128,253 $ 180,792,183
Less accumulated depreciation for:
Buildings $ (10,992,065) $ (11,400,308) $ (11,795,879)
Production (39,931,442) (41,416,622) (42,682,428)
Transmission (9,206,982) (10,344,554) (11,537,017)
Distribution (23,817,302) (25,322,267) (26,832,246)
Administration (1,102,778) (1,196,545) (1,316,532)
Vehicles (435,188) (464,219) (481,527)
Total accumulated depreciation $ (85,485,757) $ (90,144,515) $ (94,645,629)
Total capital assets, being depreciated, net 89,863,454 87,983,738 86,146,554
Total capital assets, net $ 91,746,329 $ 90,230,818 $ 88,943,529
In FY 2013, the Electric System experienced a decrease in the annual system peak demand and an
increase in annual energy sales from the previous year. The Electric System experienced its peak at 2 p.m.
on July 8, 2012 of 171.6 MW. For the year, 723.1 GWh of energy were sold, an increase of 1.8 percent
from the preceding year. The Electric Division projects energy sales in FY 2014 to total 721.2 GWh, a
decrease of 0.3 percent. The Electric Division expects annual energy sales to remain relatively constant
from FY 2014 through FY 2018.
City of Dover, Delaware 3-1 Burns & McDonnell
Page 28
2014 Engineering Consultant’s Report Electric System Overview and Assessment
Table 3-2: Fiscal Year 2014 Planned Capital Expenditures
Electric Engineering Projects:
General Scott Switchgear $ 800,000
Air Conditioner Replacement/Monitors 12,000
Substation Battery Replacement 24,500
Distribution Upgrades 400,000
Lighting Project and Rehabilitation 50,000
Distribution Feeder Replacement Program 277,500
Distribution Capacitors and Controls 60,000
Transmission Line Maintenance Program 75,000
69 kV Substation Switch Replacement 80,000
Horsepond Substation Reliability Upgrade 591,800
Subtotal Electric Engineering Division $ 2,370,800
Electric Transmission & Distribution Projects:
New Developments $ 600,000
Advanced Metering Infrastructure 150,000
Subtotal Electric Transmission Division $ 750,000
Electric Generation Projects:
Unit 3 Cooling Tower Repairs $ 42,000
McKee Run Unit 3 Auxiliary System Components 116,000
VanSant Unit 11 Component Replacements 32,000
McKee Run High Energy Piping Repairs 80,000
Metering Systems Upgrades 25,000
McKee Run & VanSant Safety & Compliance Improvemetns 86,000
McKee Run Natural Gas System Block/Bleed Valves 65,000
McKee Run & VanSant Mobile Crane Repair/Replace 125,000
McKee Run & VanSant Preservation of Structures 42,000
McKee Run Unit 3 Turbine Repairs 1,149,800
McKee Run Units 1 & 2 Component Repairs 105,000
Van Sant Capacity Increase 250,000
Subtotal Electric Generation Division $ 2,117,800
Total Planned Capital Investment Projects $ 5,238,600
3.1.1 Production Plant
The City owns two plants, the McKee Run and VanSant generating stations. McKee Run consists of three
steam turbine generating units with a total combined capacity of 136 megawatts (MW). VanSant is a 39-
MW simple-cycle combustion turbine unit.
North American Energy Services Corporation (NAES Corporation) operates the generating plants. The
agreement between the City and NAES Corporation has been in effect since July 1, 2006. The
Engineering Consultant’s observations regarding the generating stations and units are described later in
this section of the Report.
City of Dover, Delaware 3-2 Burns & McDonnell
Page 29
2014 Engineering Consultant’s Report Electric System Overview and Assessment
Effective July 1, 2011, the City entered into an Energy Management Agreement with The Energy
Authority, Inc. (TEA) to assist the City with its energy procurement, energy sales, purchase of fuels,
establishment and management of risk policies, the development and management of hedging protocols
and related energy procurement challenges.
3.1.2 Transmission and Distribution Plant
The service area includes 44 miles of overhead transmission lines, 0.12 miles of underground
transmission lines, 190 miles of overhead distribution lines and 268 miles of underground distribution
lines. Four Electric Division customers take service off of the 69-kV transmission system. These
customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG Energy Center (NRG).
NRG is an exempt wholesale generator that sells power that must be transmitted through the City’s
transmission system to third party purchasers. When the NRG plant is not operating the Electric Division
provides power for the plant site.
The Electric Division has two contracts for providing transmission service through the Electric System.
The Electric Division provides transmission service to NRG for the output of its 16 MW electric
generator. The Electric Division also has a point-to-point contract for the output of an NRG Combustion
Turbine which ties directly to the Kent Substation and is not part of the Dover transmission system.
3.1.3 General Plant
The general plant category consists primarily of Electric Division administrative and operations facilities,
and pollution control-related equipment at McKee Run and VanSant. The agreement with NAES
Corporation stipulates NAES Corporation manage the operation and maintenance of the facilities while
the City funds all replacements and upgrades required to maintain the capability of the two generating
stations. The City is also responsible for the costs of compliance with new regulations promulgated. Other
types of items included in the general plant category include office furniture and equipment, computer-
related equipment, transportation and power-operated equipment, and communication equipment. Burns
& McDonnell did not specifically assess the items in the general plant category for the Report.
3.2 Electric System Assessment
Burns & McDonnell made observations and conducted assessments of the Electric System assets in
support of the development of this annual Engineering Consultant’s Report. The findings of Burns &
McDonnell from the review of the City’s Electric System are documented herein.
City of Dover, Delaware 3-3 Burns & McDonnell
Page 30
2014 Engineering Consultant’s Report Electric System Overview and Assessment
3.2.1 Electric Generating Stations
On April 17, 2014, Mr. Ted Kelly of Burns & McDonnell met with representatives of NAES Corporation
to discuss the condition of the McKee Run and VanSant generating stations. Mr. Kenneth Beard, the Plant
O&M Manager, coordinated the visit along with Mr. Vince Scire, the Plant Manager.
3.2.1.1 Description
McKee Run consists of three units. Units 1 and 2 were originally coal-fired units, which began operations
in 1961 and 1962, respectively. In 1972, these units were converted to burn No. 6 fuel oil. Units 1 and 2
each have rated capacities of 17 MW. Unit 3 began operations in 1975 and was designed to fire No. 6 fuel
oil and natural gas. Unit 3 has a rated capacity of 102 MW. In FY 2008, the City began work to convert
all three units at McKee Run to burn No. 2 fuel oil in order to reduce pollution from the plant. To date,
the necessary upgrades and new equipment had been installed allowing each of the units to burn both
natural gas and No. 2 fuel oil.
VanSant consists of a simple cycle combustion turbine with a rated capacity of 39 MW. This unit
commenced operation in 1991. VanSant remains unmanned, except when it is dispatched into service. On
the occasions when the unit is dispatched, personnel from McKee Run are transferred to VanSant to
startup and operate the unit.
3.2.1.2 Management and Organization
Station management is very well organized and knowledgeable. Personnel take a logical approach to the
operation and maintenance of the generation facilities. Mr. Vince Scire serves as the Plant Manager. The
management/leadership team consists of eight positions including Mr. Scire’s position. The
Administrative Manager, O&M Manager, Compliance Coordinator, and Materials Coordinator, all report
directly to Mr. Scire. One Operations Supervisor and two Day Shift Operator positions are currently open
at the plant. The open Operations Supervisor position is part of the management/leadership team.
The O&M Manager oversees a Maintenance Supervisor and four Operations teams. Each operations team
consists of two supervisors and three operators working 12-hour rotating shifts. Two operators work
eight-hour flex time shifts Monday through Friday, and fill in as needed. The maintenance team consists
of a planner, a supervisor and five employees working eight-hour shifts. The operations and maintenance
personnel are all union employees. The relationship between the union and management was reported to
be excellent. McKee Run is currently at a staff level of 29 employees, with 32 approved positions.
City of Dover, Delaware 3-4 Burns & McDonnell
Page 31
2014 Engineering Consultant’s Report Electric System Overview and Assessment
3.2.1.3 Safety
“Safety First” is an overall theme and attitude of the Electric Division. Near-miss incidents are
documented, reviewed, and corrective follow-up actions are taken as required with an employee-run
safety committee actively in place. This committee conducts monthly safety meetings, completes safety
equipment inspections, and defines and implements tasks to improve safety in all areas. Members of the
safety committee complete periodic visual inspections of employee work activities utilizing an
observation checklist to detail their findings. Recorded observations are discussed and infractions
corrected. Safety is the first topic discussed at all meetings at the generating plant. An indoctrination
video emphasizing safety is shown to all visitors when entering the Station.
There were no restricted work days or lost time accidents reported in FY 2013. NAES ended the year with
51,786 man-hours worked with no OSHA recordable accidents.
3.2.1.4 Training
The required annual OSHA compliance training is completed and documented for each employee. A
formal two-day employee orientation program is required for all new employees. This orientation covers
a multitude of subjects from employee benefits to a review of the various Station operating manuals.
For operator training, the Employee Development and Qualification Program (EDQP) has been
established. EDQP is a formal program for training operators to progressively advance to positions with
additional responsibilities. In addition to the above programs, cross training of various disciplines also
occurs. An example of cross training would be plant operators training with maintenance staff.
Plant staff receive environmental and safety training online via the GPi Learning website. The training
includes tutorials and exams to ensure comprehension of the subject matter. Plant manuals, meetings, etc.
offer additional safety training.
Plant staff continues to receive appropriate operator certification training for the Pennsylvania New Jersey
Maryland Interconnection (PJM) market. This training should continue in the future. The plant also
completes planning and scheduling training on a regular basis for plant operators.
3.2.1.5 Major Equipment Operation and Maintenance
In general, the generation facilities appear to have been properly operated and maintained, and in good
condition as evidenced by the high availability of the units. The generation facilities are dispatched
sparingly and operate primarily as peaking units. As such, the individual units incur a relatively large
City of Dover, Delaware 3-5 Burns & McDonnell
Page 32
2014 Engineering Consultant’s Report Electric System Overview and Assessment
number of starts per year and low annual capacity factor. Table 3-3 summarizes the major FY 2013
operating statistics.
The large amount of time that units are not operating allows for maintenance and repair of the units. As a
result, the FY 2013 overall equivalent availability factor for the generation facilities averaged 58.99
percent. Low net capacity factors are partially offset by PJM capacity credits. In FY 2013, $14.3 million
of PJM capacity credits helped cover the fixed operating and maintenance costs of the Electric System.
PJM capacity credits are expected to continue to provide similar benefits in FY 2014 and beyond.
3.2.1.6 Electronic Management System
Maintenance activities are organized, planned, and managed using MP2tm by CMMS Data Group, a
computer-based management system. All three major categories of maintenance activities (corrective,
preventative, and predictive) are electronically managed by MP2tm.
Table 3-3: FY 2013 Generating Plant Operating Statistics
Rated Net Net Heat
Capacity - Production - Net Capacity Rate Number of
Unit Number MW MWh Factor Btu/kWh Starts
VanSant 39 1,568.4 0.46% 12,096 8
McKee Run
Unit 1 17 545.5 0.37% 15,866 2
Unit 2 17 1,024.4 0.69% 14,812 4
Unit 3 102 12,692.5 1.42% 11,715 18
Total 175 15,830.7 1.03% 32
Forced Equivalent
Outage Operating Service Availability
Unit Number Hours Hours Factor Factor
VanSant - 52.1 0.59% 59.45%
McKee Run
Unit 1 80.0 74.8 0.85% 57.62%
Unit 2 - 170.3 1.94% 59.45%
Unit 3 - 201.8 2.30% 59.45%
Total 80.0 499.0 5.70%
For corrective maintenance activities, any station operator or mechanic can enter a work order into the
system at any terminal on the Station local area network (LAN). A supervisor reviews the request, turns it
into a work order, and assigns a priority according to a predetermined categorization. The work order is
planned, parts are ordered, and then the work order is assigned to an operator or maintenance technician
for completion once the material has been received.
City of Dover, Delaware 3-6 Burns & McDonnell
Page 33
2014 Engineering Consultant’s Report Electric System Overview and Assessment
This system is also used to manage and track preventative maintenance activities that follow a schedule.
Changing filters, and turning on and off heat tracing are examples of preventative maintenance. Predictive
maintenance activities practiced include oil analyses, vibration testing, and infrared surveys. Portable
vibration testing equipment is used at the Stations to improve the frequency of and capabilities to trouble-
shoot rotating equipment. The technology allows personnel to identify problems and take corrective
actions before equipment failure occurs.
3.2.1.7 Electric Generation Improvements
The following describes completed, on-going, and planned improvements to the City’s generation assets:
Recently Completed:
DOE Grant - Photovoltaic Panels
McKee Run & VanSant Arc Flash
McKee Run Driveway Repaving
Unit 3 Fire Protection System
Unit 3 Cooling Tower Life Extension
Unit 1 Outage FY 2011
Unit 2 - Boiler Inspection & Repair
VanSant CT Mark IV Upgrades
Work Management Software Replacement
Unit 3 - Gas Modification
Unit 3 Air Heater Expansion Joint
Units 1 and 2 Control Modifications
Units 1 and 2 Stack Repairs Inspection
Unit 3 - Stack Repairs Inspection
Unit 3 Boiler Air Heater
Unit 3 FD and ID Fan Controller Upgrade
Unit 3 DCS Computers & Software Upgrades
Units 1 and 2 Component Repairs
VanSant Component Replacements
Unit 3 Auxiliary System Components
Industrial Wastewater Discharge System
Unit 3 Air Heater Expansion Joint
Unit 3 Generator Repairs
City of Dover, Delaware 3-7 Burns & McDonnell
Page 34
2014 Engineering Consultant’s Report Electric System Overview and Assessment
Units 1 & 2 Stack Repairs
Unit 1 Gasket Leak Repair
On-Going:
McKee Run Preservation of Structures
Unit 3 Boiler Systems
Unit 3 Auxiliary System Components
Unit 3 Turbine Outage – Inspections & Repairs
Units 1 & 2 Component Repairs
Planned:
McKee Run Building Equipment Replacements
McKee Run High Energy Piping
McKee Run Natural Gas System Block/Bleed Valves
McKee Run Fuel Oil System Refurbishment
Unit 3 – Stack Repairs
Unit 3 – Cooling Water Line Replacement
Unit 3 – Cooling Tower Life Extension
Units 1, 2 & 3 Hydrogen Purity Analyzers
VanSant Capacity Increase
VanSant Major Overhaul & Inspection
VanSant Component Replacements
Metering System Upgrades
Safety & Compliance Improvements
Vehicles, Trucks & Equipment
3.2.1.8 Condition Assessment
The following is a summary of the condition assessment of major equipment at McKee Run and VanSant
as presented by the NAES corporation staff. Burns & McDonnell made no internal assessments of
equipment during the facility tour.
City of Dover, Delaware 3-8 Burns & McDonnell
Page 35
2014 Engineering Consultant’s Report Electric System Overview and Assessment
3.2.1.9 Steam Turbines/Generators
The steam turbines and generators for VanSant and McKee Run Units 1 and 2 were reported to be in
satisfactory condition with no major problems. McKee Run Unit 3 turning gear engagement problems
were reported in the summer 2010 outage report and repairs were completed in FY 2012.
XL Insurance completes inspections of the Electric Division production facilities on an annual basis.
After each inspection the insurance provider issues a report detailing its risk reduction recommendations.
A recommendation following the FY 2011 inspection addressed safety. XL Insurance recommended the
installation of a permanent fire protection system for the turbine generator bearings at McKee Run. The
City completed the installation of the system in FY 2011 for Unit 3. The City and XL Insurance agree that
portable foam generating carts are sufficient fire protection for Units 1 and 2, due to their light use.
For FY 2012, Unit 1 conducted turbine generator checks and found a bearing steam seal leak. Steam seals
were removed and sent out for refurbishment by Siemens Energy Services during the fall 2012 outage.
Bearing was inspected and checked for wear. Bearing did have some wear and did not meet acceptable
tolerance, so it was sent out for refurbishment by Fusion Babbiting. Turbine condition assessment was
conducted during the fall outage and the Units were found to be in satisfactory working condition.
For Spring 2013, an extensive inspection and testing was performed on Unit 3’s turbine and generator.
The inspection showed signs of seam oil, hydrogen, and busing box leakages. All issues were fixed and
brought to acceptable operating standards. NAES Instrument, Control and Electrical (IC&E) Technicians
completed four recommended General Electric Technical Information Letters (TIL) projects for VanSant
Unit 11 in both spring and fall 2013 outages as shown below:
1. Annual TIL 1004-2R1 (IGV’s and first stage corrosion/pitting inspection)
2. Annual TIL 1068-2R1 (IGV’s bushing inspection)
3. Annual TIL 1132-2 (IGV thrust washer corrosion inspection)
4. Annual TIL 1049-2R1 (Inspect and measure dovetail material loss)
During the fall 2013 outage, NAES mechanics installed new hand wheel throttle valve mechanical parts.
Thereafter, the IC&E installed a portable vacuum pump to the Unit 1 turbine to simulate vacuum. The
turbine was reset and the throttle valve was closed. The throttle valve was then fully opened with no
issues and the handle was freewheeling.
City of Dover, Delaware 3-9 Burns & McDonnell
Page 36
2014 Engineering Consultant’s Report Electric System Overview and Assessment
3.2.1.10 Boilers and Auxiliaries
Boiler inspections are conducted every year on each of the boilers. The annual inspections typically
include the inspection and cleaning of the major boiler components, including the mud and steam drums,
the forced draft and induced draft fans, the windbox, condenser water box, condenser tubes, hotwell, air
preheater components, and safety valves.
In FY 2011, the outlet duct expansion joint was replaced on Unit 3. Operations removed the appropriate
insulation and lagging to prepare the duct. The Electric Division contracted Apex to complete the
installation the equipment. A complete seam weld was utilized to seal the joint and the job site was
cleaned. No additional problems with this joint developed in FY 2012.
In FY 2012, several principle changes were made on the generating system’s boiler and auxiliary units at
McKee Run. New beck drives were installed on Unit 3 induced draft and forced draft fans. Also, sector
plates and seals were replaced in the Unit 3 air heater.
Following its FY 2010 annual inspection of the production facilities, XL Insurance recommended the City
implement a program that tracks annual hot and cold settings of hangers in the steam, reheat, feedwater
and boiler systems. In FY 2011 and FY 2012, the City met the recommendation by implementing a
program that will examine the high energy piping systems on a five-year basis, beginning in 2014.
During FY 2013 inspections, no major issues were found within the Unit 1 or Unit 2 boiler. Unit 3 had an
issue during the startup of the boiler while attempting to obtain a boiler purge. The issue was fixed by
replacing a Gas Fuel Trip Relay. Waterwall tubing sections were replaced within Unit 3’s A-2 burner.
3.2.1.11 Station Cooling Water Systems
The Station has split cooling water systems with one system serving Unit 1 and Unit 2 and a separate
system serving Unit 3. Projectile tube cleaning was completed on the Unit 1 and Unit 2 condensers during
the spring FY 2011 outage. All the tubes in each unit were cleaned utilizing the scraper blade plug
method. Samples were taken from the tube cleanings and retained for inspection. No leaks were detected
in the expansion joint or condenser tubes. Each condenser box was cleaned. Projectile tube cleaning was
last completed in the 1980’s. The cooling water systems are reported to be sufficiently sized and in
satisfactory condition, with no major issues reported at the time of this Report.
3.2.1.12 Fuel Handling Systems
Natural gas is delivered to the Station via a 4-inch pipeline for Unit 1 and Unit 2 and in a 10-inch
diameter pipeline for Unit 3. No. 2 fuel oil is delivered to the Station by truck and unloaded into tanks.
City of Dover, Delaware 3-10 Burns & McDonnell
Page 37
2014 Engineering Consultant’s Report Electric System Overview and Assessment
Forwarding pumps deliver the fuel oil to each of the units. No major fuel projects were reported to be
completed in FY 2012.
3.2.1.13 Water Treatment/Steam Purity
Quality control parameters for boiler feed-water, internal boiler water, cooling tower water, and steam
purity are checked at a minimum of twice per day when systems are operating. Results are recorded and
graphically compared to control limits. Adjustments are then made as required. Boiler feed water is
treated city water (well water from the City) using a regenerative ion resin demineralizer system, along
with deaeration for oxygen control. Boilers 1 and 2 use a coordinated phosphate control for boiler internal
purity control and Boiler 3 uses a balanced trisodium phosphate and disodium phosphate within a narrow
pH range. A deep-bored water well was installed to provide water in addition to the City supplied water.
City water has a high chlorine level which may exceed the Station permitted limits. By combining City
water with the well water, the chlorine levels can be maintained at the permitted limits. Water for cooling
tower makeup is also obtained from City water. The primary control parameter is silica concentration.
Blow down is adjusted as required to maintain control. The City is currently undergoing the approval
process with Kent County to obtain an integrated waste water permit to be able to discharge cooling water
to the sewer system. No major water treatment issues were reported at the time of this Report.
Steam purity is not continuously monitored. Samples are taken twice daily and tested for pH,
conductivity, and silica. There have not been any problems with steam purity. Annual inspections of the
boiler drums and separation internals have verified that these systems are intact and operating properly.
Following its FY 2010 annual inspection of the production facilities, XL Insurance recommended the City
implement lay-up procedures to protect water systems from corrosion. In FY 2011 and FY 2012, NAES
worked to update plant procedures to conform to best practices/OSHA standards.
In FY 2012, the station did not experience any internal corrosion related failures, steam path deposits, or
excessive condenser fouling. NALCO provides water treatment consulting services and chemicals. A
representative visits the Station periodically to review test data and check chemical usage rates. No major
issues were reported at the time of this Report.
3.2.1.14 Station Electrical Systems
Overall, Station electrical systems and transformers are considered to be in satisfactory condition. A
condition assessment of the generation facilities’ transformers was conducted in February 2011. Oil
inspections and analyses were conducted. The inspector recommended that normal operation continue for
City of Dover, Delaware 3-11 Burns & McDonnell
Page 38
2014 Engineering Consultant’s Report Electric System Overview and Assessment
all the transformers at the plant. Oil sampling is now completed twice per year on the generator step-up
transformers (GSUs). All plant transformers are examined annually.
Following its FY 2008 annual inspection of the production facilities, XL Insurance recommended the City
build blast walls around transformers at the plant. In FY 2011, the City continued to research blast wall
protection. Fire barrier walls were installed between the Unit 1 and 2 auxiliary transformers and the Unit
3 start-up transformer. Based on the 2012 XL Insurance annual inspection, there is still no sprinkler
protection for GSU’s 1-3.
3.2.1.15 Station Control Systems
Unit 1 and Unit 2 controls are electro-pneumatic and Unit 3 controls are a distributed control system
(DCS). During the March FY 2011 spring outage, a controls upgrade was completed at McKee Run Units
1 and 2. The new devices control igniters, pilots and shut down main fuel to protect the boiler. The project
included the installation of new limit switches on main gas, pilot gas, and oil supply/return valves. The
controls upgrades help the system meet national fire protection codes.
Following its 2007 annual inspection of the production facilities, XL Insurance recommended the City
seal openings in fire barriers through which cables pass. The City has worked each year since to make
progress on sealing openings in fire barriers. The City completed sealing the rest of the openings as part
of its boiler controls and control room upgrades in 2013.
In general, the station control systems are considered to be in satisfactory condition. The Unit 1 and Unit
2 control systems are outdated but perform satisfactorily. All relays have recently been inspected at both
McKee Run and VanSant for North American Electric Reliability Corporation, PJM Interconnection and
Mid-Atlantic Area Council compliance. The electro hydraulic control system was modified to become a
primary/primary system in 2013. In 2013 additional control wiring was installed to upgrade the Unit 1
and Unit 2 gas control system. No major controls issues were reported at the time of this Report.
3.2.1.16 General Facilities
No major projects or improvements were completed to the General Facilities in FY 2013 other than
routine maintenance and repairs. In general, the station facilities appeared clean and well maintained
during the site visit.
3.2.1.17 VanSant Generating Station
In general, the unit is operated infrequently, but is well maintained. Although the station is only manned
when operating, an operator performs a twice daily walk through with a checklist of items to review and
City of Dover, Delaware 3-12 Burns & McDonnell
Page 39
2014 Engineering Consultant’s Report Electric System Overview and Assessment
the results are logged. The annual overhaul and inspections were conducted at VanSant during FY 2013.
No major problems were found.
The VanSant unit has the capability of black starts. The unit has the capability of remote control;
however, the unit is not permitted for remote control.
XL Insurance completes inspections of the Electric Division production facilities on an annual basis.
After each inspection the insurance provider issues a report detailing its risk reduction recommendations.
The lone recommendation for VanSant following the FY 2012 inspection addressed safety. XL Insurance
recommended the installation of gas detection equipment at the plant. A gas detection system has been
installed. The gas detectors will activate the fire suppression system and alarm to the central control
system. No other major repairs or upgrades were made at VanSant in FY 2013.
3.3 Transmission and Distribution Systems
On April 17, 2014, Mr. Ted Kelly visited the City to collect information and to observe the City
transmission and distribution system, as operated and maintained by the Electric Division. Mr. Bill
Hewlett provided information related to the transmission and distribution system. Mr. Hewlett also led a
tour of the electric transmission and distribution system.
The Electric Division distributes power to its customers by a network of transmission lines, distribution
substations, and distribution lines. The transmission lines are rated at 69 kV and are connected to fifteen
distribution substations located throughout the service area. The distribution substations reduce the power
from transmission voltages to the primary distribution voltages of 12 kV to facilitate distribution of
electric power to customers.
3.3.1 Safety
Mr. Hewlett reported to Burns & McDonnell that there were no reportable injuries or lost workdays in FY
2013.
3.3.2 System Reliability
The Electric Division provides for reliability of its distribution system by configuring a majority of its
distribution circuits in primary open loop arrangements, improving existing circuits, and installing
adequate substation transformer capacity. Normal transformer and line loading are limited to provide
sufficient margin to convey firm power requirements during an emergency or a switching operation, or
for maintenance.
City of Dover, Delaware 3-13 Burns & McDonnell
Page 40
2014 Engineering Consultant’s Report Electric System Overview and Assessment
3.3.3 Power Quality
The Electric Division does not have any significant power quality problems. The overall power factor for
the Electric System decreased from 99.86 percent in FY 2012 to 98.43 percent in FY 2013. Power
transformers are equipped with load tap changers that regulate bus voltages at the distribution substations.
Distribution transformers are equipped with no-load taps to make voltage adjustments. There are
capacitors and voltage regulators on the Electric System that control voltage and vars on the portion of the
system furthest away from the current source and generation. The system operators monitor the power
factor closely and turn on capacitors or adjust the generation to compensate for low power factors.
3.3.4 Operations and Maintenance
The Electric Division has a SCADA system that is monitored continuously for any problems that may
arise in the Electric System. The main control room has two system operator desks and a large screen
where system operating information is displayed. System operators can monitor the Electric System
operation, such as voltage levels, current flows, etc. and make necessary adjustments as problems arise.
The systems operators have received some PJM training, but are not required to be certified as Delmarva
Power is the controlling agency.
Loading on substation transformers used for an emergency, a switching operation, or maintenance is
limited to 120 percent of the rated capacity, followed by a twelve-hour cool-down period. The Electric
Division has eight line crews to work on the system. Four crews are responsible for overhead lines, four
crews are responsible for underground lines, and one crew is responsible for maintenance. The primary
responsibilities of the eight line crews are installation of new service connections and construction of new
lines. The trouble crew maintains the street lights, repairs underground services and is the first responder
to outages. Tree trimming is contracted out and is no longer performed by the Electrical Division;
however, performance of the contractor is monitored by the Line Crew Superintendent.
The Substation/Relay Maintenance Division is responsible for operation and maintenance of the
substations and associated equipment. Visual inspections of substations, associated equipment, trip
counter checks and battery systems checks are performed regularly. The Substation/Relay Maintenance
Division is also responsible for contractor oversight during annual transformer condition assessments.
TJ/H2b Analytical Services completed the annual transformer condition assessments in February 2011.
No abnormal gas was indicated and since the oil condition was within acceptable parameters, TJ/H2b
recommended the continuation of normal operation. The City has a contract with an environmental
City of Dover, Delaware 3-14 Burns & McDonnell
Page 41
2014 Engineering Consultant’s Report Electric System Overview and Assessment
consultant to check each substation for oil leaks and to provide instruction on cleaning up in the event of
an oil spill.
The City contracts with an outside firm to inspect and chemically treat each wood pole in the Electric
System every ten years. This is accomplished by awarding a five-year contract to spread out the expenses.
Pole treatments were completed in May of 2013. Dover treated and inspected over 760 poles during 2013,
of which, only one pole was rejected providing a 99.9% pass rate.
3.3.5 Design Standards and Specifications
The Electric Division designs the transmission and distribution circuits and some substation upgrades in
conformance with national safety standards. Other substation and transmission design is contracted to
Pike Electric, Inc.
The underground distribution design utilizes road or alley front access construction. This design means
the electrical equipment, such as transformers and underground cable, are installed beside the road instead
of behind houses or buildings. The advantage of front access construction is the accessibility for
maintenance and repairs to cable and electric equipment. The underground cables are installed in
polymerized vinyl chloride pipe for added protection and for easy cable replacement. The Electric
Division installs jacketed, concentric cable that is rated at 15 kV, with 133 percent ethylene propylene
rubber insulation.
The standard overhead distribution design utilizes a flat construction with a single cross-arm and
insulators on 45-foot class 2 poles. Typically all electrical equipment locations have ground rods installed
with measured readings of 25 ohms or less.
The substation design is generally a low-profile rigid bus design. The circuit breakers are SF6 gas-filled
and the relays are microprocessor based with SCADA control and monitoring.
3.3.6 Transmission and Distribution Capital Improvements
The following describes completed, on-going, and planned improvements to the City’s transmission and
distribution assets:
Recently Completed:
69-kV Feeders 3 and 4
Replacement of 69-kV Breakers & Design
Governors Avenue Rebuild
City of Dover, Delaware 3-15 Burns & McDonnell
Page 42
2014 Engineering Consultant’s Report Electric System Overview and Assessment
Mid-City Substation Upgrades
Substation PT and CT Replacement
Transmission Relaying, Replacement and Calibrations
Outage Management System
Wyoming Avenue – Underground
Pleasanton Acres – Underground
Royal Grant – New Underground Service
Dover Downs Switchgear
Substation Equipment & Fencing
69kV Switch Replacement
Frazier Substation Reliability Upgrade
On-Going:
Capitol Park – Underground
Morris Estates – Underground
Bayside Drive (Persimmon to White Oak Road)
Lighting Project and Rehabilitation
Horsepond Road Substation Reliability Upgrade
Transmission Line Maintenance Program
Distribution Capacitors – Overhead
Distribution Capacitors – Underground
New Developments – UG Transformers
New Developments – UG Conductors/Devices
Meter Replacements
Vehicles, Trucks, & Equipment
Planned:
Substation Battery Replacement
Richardson Circle
Lebanon 400 Feeder
Townpoint Distribution Upgrades
Distribution System Upgrades – Unidentified
Horsepond Road URD – Distribution Feeders
City of Dover, Delaware 3-16 Burns & McDonnell
Page 43
2014 Engineering Consultant’s Report Electric System Overview and Assessment
McKee Run Yard Rebuild (Transmission)
Distribution Feeder Replacement Program
McKee Run & State College Road Feeder Replacements
GOTP Transmission Line Relocation
McKee Run Transformer/Substation Repairs
Horsepond SS to Cartanza 69kV Rebuild
69kV Substation Cable Replacement North Street
General Scott Switchgear
Dover Air Force Base Substation Rebuild
System Automation
DNREC R&R Metering
West Dover Connector
Meadows at Jefferson Terrace
Chestnut Grove Development
Garrison Oak Technical Park
Uzin Utz Manufacturing
3.3.7 Condition Assessment
The transmission and distribution system assessment included drive-by observations of a sample of the
transmission circuits, distribution circuits, and substations. Many of the fifteen substations were
physically observed during the tour. The following substations were observed during the tour:
McKee Substation
College Park Substation
Dover Downs Substation
Frazier Substation
VanSant Substation
General Scott Substation
Division Street Substation
Mid-City Substation
Mayfair Substation
St. Joan’s Substation
Cartanza Substation
City of Dover, Delaware 3-17 Burns & McDonnell
Page 44
2014 Engineering Consultant’s Report Electric System Overview and Assessment
Horsepond Substation
Danner Farm Substation
Lebanon Substation
In general, the substations were in acceptable operating conditions. Bill Hewlett provided a tour of the
substations with Ted Kelly on April 17, 2014. The Frazier Substation was rebuilt last year; an additional 3
breaker system was added for a 69 kV bus. The General Scott Substation has relatively new breakers, and
the controls are scheduled to be upgraded in FY 2014 or 2015. Horsepond Substation is currently being
rebuilt. Work started in late February and scheduled to be back in service by June, 2014. Conductor line
was replaced at the Savannah and White Oak Substation areas. The City’s in the process of replacing
conductor throughout the entire 69 kV system. Moving forward, a greater portion of the system will be
converted from overhead to underground distribution.
3.4 Conclusions
Based on statements and information provided, as well as the observations and reviews performed, it is
the opinion of Burns & McDonnell that the City’s power generation facilities are being operated and
maintained consistent with accepted electric utility practice in the United States. In general, the
performance, operation, maintenance, staff, planning, and training aspects for the McKee Run and
VanSant stations were found to be above average. Specifically, the generation facilities have
demonstrated a high level of availability despite the dispatching of the units primarily for peak demand.
It is the opinion of Burns & McDonnell that the design, construction, operation and maintenance of the
City’s electric transmission and distribution system and the associated facilities are consistent with
current generally accepted electric utility standards. In completing Annual Engineering Consultant’s
Reports over the past several years, Burns & McDonnell has observed that the City has made appropriate
system upgrades and improvements. The City and the Electric Division are proactive in preventative
maintenance and expansion of the Electric System before problems arise.
City of Dover, Delaware 3-18 Burns & McDonnell
Page 45
4.0 – FINANCIAL ASSESSMENT
Page 46
2014 Engineering Consultant’s Report Financial Assessment
4.0 FINANCIAL ASSESSMENT
A review of the financial results of the Electric System for the fiscal year ended June 30, 2013, is
provided below.
4.1 Financial Results
The total revenue of the Electric Division during FY 2013 included revenue from charges for electric
service, as well as miscellaneous revenues from items such as rents, penalties, reconnection fees, and
development fees. On Table 4-4, revenues were compared to the Electric Division’s costs of providing
services to its customers to determine whether the financial requirements of the Electric Division were
met.
4.1.1 Required Revenue Level
The level of revenues required from the retail electric rates for the Electric Division was determined
through the analysis of the financial results and net income or net margins for the most recent fiscal year.
The City of Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted
December 23, 1985 requires that the Electric Division maintain a debt service coverage ratio of 1.25. The
following is an excerpt from Section 502(c) of the resolution.
“(c) The total amount of the Revenues of the Electric System during the preceding fiscal year shall
have been not less than the total of the following:
(3) The Current Expenses of the Electric System during the current fiscal years shown by the Annual
Budget . . . for such fiscal year, and
(4) One hundred twenty-five percent (125%) of the maximum amount of the Principal and Interest
Requirements for any fiscal year thereafter on account of all bonds then Outstanding under the
provisions of this Resolution.
The City further covenants that, from time to time and as often as it shall appear necessary, it will
adjust the electric rates as may be necessary or proper so that the revenues of the Electric System in
each fiscal year will not be less than the total of the amounts set forth in subdivision (c) of this
section.”
4.1.2 Electric Rates
Customers of the Electric Division are charged for the electric service based on rate schedules, tariffs, or
contracts that reflect the costs to the Electric Division of providing that service. For purposes of setting
City of Dover, Delaware 4-1 Burns & McDonnell
Page 47
2014 Engineering Consultant’s Report Financial Assessment
electric rates, customers with similar load and service characteristics should be placed in the same rate
classification.
A comprehensive cost-of-service and rate design study was completed in 2006 and subsequent rate
analyses were completed in 2007 and 2008 to examine revenue requirements and revenue generation.
Specifically, the 2006 rate study was conducted to address increased costs associated with a new power
supply contract that became effective on July 1, 2006. The rate study recommended combining a number
of rate classes and implementing rate increases on July 1, 2006. The 2006 rate study also recommended
an additional increase be implemented on January 1, 2007 to cover increased costs associated with
operating the generating station. The 2007 and 2008 rate analyses re-examined Electric Division revenues
and expenses and recognized additional revisions to power supply costs. As a result of these analyses,
additional rate increases were implemented on July 1, 2007 and July 1, 2008. The City retained Burns &
McDonnell to conduct cost-of-service and rate design study in 2012 followed by an update in 2013. The
2012 study examined revenue adequacy, revenue responsibility, and revenue recovery for the Electric
Division. It scrutinized customer classes and proposed adjustments for demand rate components and
corresponding changes to energy charges. In May 2013, the City retained Burns & McDonnell to
incorporate updated power supply cost projections, and other updates, into the model it developed as part
of the 2012 Study. The current rate classes are listed below.
Residential
Small Commercial (1 Phase, 3 Phase, 1 Phase Heating, Church, and Municipal)
Medium Commercial (1 Phase & 3 Phase)
Large Commercial (3 Phase with Reactive Metering)
Primary
Transmission
Outdoor Development Lighting
Private Outdoor Lighting
4.1.3 Operating Results
Table 4-1 presents a summary of the annual energy sales, the average monthly number of customer
accounts, and the annual average kilowatt-hour (kWh) energy per customer of the Electric Division for
FY 2011 through FY 2013. Annual energy sales decreased in FY 2012 to 710.3 GWh, a decrease of 3.2
percent from 734.1 GWh in FY 2011. Energy sales increased to 723.1 GWh in FY 2013, a 1.8 percent
increase from FY 2012.
City of Dover, Delaware 4-2 Burns & McDonnell
Page 48
2014 Engineering Consultant’s Report Financial Assessment
Table 4-1: Annual Sales and Customer Accounts
FY 2011 FY 2012 FY 2013
Energy Sales (kWh)
Residential 208,092,047 196,388,942 204,759,680
Commercial 243,985,517 230,814,311 232,220,877
Primary 153,879,249 160,560,686 167,144,717
Transmission 128,146,159 122,563,783 119,003,804
Total Energy Sales 734,102,972 710,327,722 723,129,078
Average Number of Monthly Customers (bills)
Residential 19,730 19,910 19,990
Commercial 3,140 3,355 3,412
Primary 42 39 37
Transmission 3 4 4
Total Customers Accounts 22,915 23,308 23,443
Energy Usage Per Customer (kWh/cust./yr.)
Residential 10,547 9,864 10,243
Commercial 77,702 68,797 68,060
Primary 3,663,792 4,116,941 4,517,425
Transmission 42,715,386 30,640,946 29,750,951
Average Usage Per Customer 32,036 30,476 30,846
Table 4-2 presents revenues from sales, revenue per kWh ratios, and average revenue per customer ratios
for each revenue classification. Total revenue from sales to electric customers in FY 2013 was $88.3
million, representing a decrease of $3.6 million, or 3.9 percent from FY 2012. Total revenue from sales to
electric customers includes utility tax revenue and power cost adjustment revenue.
In FY 2013, the average rate revenue per kWh for residential customers was 14.00 cents and the total
average rate revenue was 12.22 cents per kWh. The July 2012, through June 2013 national average
monthly utility-level retail sales of electricity and associated revenue per kWh, as published by the US
Energy Information Administration (EIA), were 11.88 and 9.84 cents per kWh, respectively. For a state-
wide comparison, the EIA summarized the Delaware July 2012 through June 2013 average monthly
utility-level retail sales of electricity and associated revenue per kWh to be 13.58 cents per kWh for
residential customers and 11.06 cents per kWh across all sectors.1
1
US Energy Information Administration, Form EIA-826 Data Monthly Electric Utility Sales and Revenue Data,
http://www.eia.gov/electricity/data/state/avgprice_annual.xls (May 22, 2014)
City of Dover, Delaware 4-3 Burns & McDonnell
Page 49
2014 Engineering Consultant’s Report Financial Assessment
Table 4-2: Annual Revenues and Sales Ratios
FY 2011 FY 2012 FY 2013
Revenue
Residential $ 30,774,462 $ 28,072,775 $ 28,668,248
Commercial 36,572,134 33,381,554 30,520,784
Primary 18,450,238 17,986,987 17,699,865
Transmission 13,716,322 12,506,664 11,442,299
Total Revenue $ 99,513,156 $ 91,947,980 $ 88,331,196
Revenue/kWh
Residential $ 0.1479 $ 0.1429 $ 0.1400
Commercial 0.1499 0.1446 0.1314
Primary 0.1199 0.1120 0.1059
Transmission 0.1070 0.1020 0.0962
Total Revenue/kWh $ 0.1356 $ 0.1294 $ 0.1222
Revenue Per Customer
Residential $ 1,560 $ 1,410 $ 1,434
Commercial 11,647 9,950 8,945
Primary 439,291 461,205 478,375
Transmission 4,572,107 3,126,666 2,860,575
Average Revenue Per Customer $ 4,343 $ 3,945 $ 3,768
The Electric Division’s largest cost in providing electric service to its customers in FY 2013 was the
wholesale cost of power. The Electric Division purchased power from the PJM Interconnection
marketplace through its Energy Manager, TEA. The cost of non-generated power includes energy and
demand costs, power supply management expense, PJM charges and credits, generation fuels cost, and
capacity charges and credits.
The significance of power supply cost to the Electric Division is illustrated in Table 4-3. The top portion
of the Table shows net operating revenue as the difference between total revenues generated by the rates
and the cost of power supply.2 The ratios of power supply cost to sales revenues were calculated for FY
2011 through FY 2013. As illustrated, the Electric Division’s power supply cost as a percentage of rate
revenue increased from 64.1 percent in FY 2012 to 63.0 percent in FY 2013.
2
For the purposes of this Report, the phrase “Power Supply” refers to the sum of the costs of power purchased and
power generated. This includes plant costs and the cost of fuel. Power Supply also includes any expenses in the CIP
Fund that are not capital expenses. The phrase “Purchased Power” refers only to the cost of power purchased from
the market and other directly associated costs.
City of Dover, Delaware 4-4 Burns & McDonnell
Page 50
2014 Engineering Consultant’s Report Financial Assessment
Table 4-3: Revenue Margins and Unaccounted for Energy
FY 2011 FY 2012 FY 2013
Net Revenue Margins ($)
Sales Revenues $ 99,513,156 $ 91,947,980 $ 88,331,196
Power Supply 69,616,076 58,929,133 55,681,251
Net Revenue Margin $ 29,897,080 $ 33,018,847 $ 32,649,945
Net Revenue Ratio 70.0% 64.1% 63.0%
Unaccounted for Energy (kWh)
Power Supply 768,254,000 738,190,000 752,869,000
Energy Sales 734,102,972 710,327,722 723,129,078
Unaccounted for Energy (Losses) [1] 34,151,028 27,862,278 29,739,922
Percentage 4.4% 3.8% 4.0%
[1] Unaccounted for Energy (Losses) includes street lighting energy
Table 4-3 also illustrates the ratio of the amount of energy purchased and delivered to the electric system
to total energy sales. This relationship identifies the level of unaccounted for energy in the Electric
System. This unaccounted for energy may include energy that was unmetered, metered inaccurately,
stolen, lost, PJM transmission line losses, local system line/transformer losses, etc. The bottom portion of
Table 4-3 presents these comparisons for the Electric Division for FY 2011 through FY 2013. As shown,
the percentage ratio of the unaccounted for energy to the total energy purchased for FY 2013 was 4.0
percent. This is up from 3.8 percent in FY 2012.
Table 4-4 presents a re-creation of the Electric Division’s Statement of Revenues, Expenses, and Changes
in Unreserved Retained Earnings for the Electric Revenue Fund for FY 2011 through FY 2013. Net
income decreased from FY 2012, totaling $6.2 million in FY 2013. An increase in Operating – Transfers
Out resulted in a $2.3 million decrease in net income for the year. The General Fund Transfer was
increased by $2.0 million to help finance the Calpine Project which the City is currently negotiating with
for a Purchase Power Agreement and Capacity Agreement in light of the decommissioning Units 1 and 2.
City of Dover, Delaware 4-5 Burns & McDonnell
Page 51
2014 Engineering Consultant’s Report Financial Assessment
Table 4-4: Comparative Statement of Revenues, Expense,
and Changes in Unreserved Retained Earnings
FY 2011 FY 2012 FY 2013
Operating Revenues:
Charges for Electric Service $ 99,513,157 $ 91,947,980 $ 88,331,196
Miscellaneous Services/Incomes 2,389,462 1,581,421 2,354,497
Total Operating Revenues $ 101,902,619 $ 93,529,401 $ 90,685,693
Operating Expenses:
General Administration $ 5,298,869 $ 5,223,149 $ 4,470,795
Power Supply 69,616,076 58,929,133 55,681,251
Transmission/Distribution 3,083,714 3,023,566 3,267,698
Engineering 1,722,244 1,163,379 1,107,231
Metering 204,352 205,791 219,010
System Operations 486,894 498,063 544,405
Utility Tax 1,944,543 1,548,208 1,443,853
Depreciation 4,710,658 4,783,444 4,621,501
Retirees Pension 1,115,765
Retiree Health Care 1,839,110 1,015,731 696,500
Total Operating Expenses $ 88,906,460 $ 76,390,464 $ 73,168,009
Net Operating Income $ 12,996,159 $ 17,138,937 $ 17,517,684
Non-operating Revenues (Expenses)
Interest Earned
Operating Fund $ 832,145 $ 120,876 $ 190,469
Reserved Funds 511,922 348,640 506,771
Net Increase in Fair Value of Investments (861,216) 45,200 (614,989)
Interest and Fiscal Charges (1,385,035) (1,283,174) (1,432,779)
Bond Discount Amortized (21,579) -
Gain/(Loss) on Sale of Assets 16,830 47,966 5,203
Total Non-operating Revenues(Expenses) $ (906,933) $ (720,492) $ (1,345,325)
Net Income Before Operating Transfers $ 12,089,226 $ 16,418,445 $ 16,172,359
Operating Transfers - In - - 8,282
Operating Transfers - Out (8,856,000) (7,876,288) (10,000,000)
Total Net Operating Transfers $ (8,856,000) $ (7,876,288) $ (9,991,718)
Net Income $ 3,233,226 $ 8,542,157 $ 6,180,641
4.1.4 Adequacy of Electric Rates
The City’s Bond Resolution requires annual revenues of the Electric Division be no less than the total
current expenses plus 125 percent of the greatest remaining annual debt service. “Current expenses”, as
defined in the Resolution, includes all expenses necessary to maintain and repair the Electric System, all
administrative expenses, and engineering, legal or other consultant fees. Transfers to reserve accounts and
special purpose funds, and allowances for depreciation are specifically excluded from “current expenses.”
City of Dover, Delaware 4-6 Burns & McDonnell
Page 52
2014 Engineering Consultant’s Report Financial Assessment
In order to determine if the City and the Electric Division have met this requirement, the net income
shown in Table 4-4 was adjusted to include the interest on bonds, depreciation expense, and other non-
cash income and expenses. Table 4-5 summarizes net income adjustments and the calculation of the
revenues available for debt service for FY 2011 though FY 2013.
Table 4-5: Debt Service Coverage
FY 2011 FY 2012 FY 2013
Net Income $ 3,233,226 $ 8,542,157 $ 6,180,641
Plus Excluded Expenses:
Operating Transfers - Out $ 8,856,000 $ 7,876,288 $ 10,000,000
Depreciation 4,710,658 4,783,444 4,621,501
Interest and Fiscal Charges 1,385,035 1,283,174 1,432,779
Bond Discount Amortized 21,579 - -
Gain/(Loss) on Sale of Assets (16,830) (47,966) (5,203)
Less Excluded Income:
Net Increase in Fair Value of Investments 861,216 (45,200) 614,989
Interest Earned - Reserve Funds (511,922) (348,640) (506,771)
Revenues Available for Debt Service $ 18,538,962 $ 22,043,257 $ 22,329,654
Maximum Principal and Interest in Any Year $ 3,401,954 $ 3,401,954 $ 3,401,954
Debt Service Coverage 5.45 6.48 6.56
Minimum Required Debt Service Ratio 1.25 1.25 1.25
As Table 4-5 illustrates, the City and the Electric Division maintained a debt service coverage ratio each
year that exceeded the required 125 percent plus current expenses. Therefore, the revenues generated by
the current electric rates have been sufficient to meet the applicable covenants of the Resolution.
Section 502 of the Resolution requires that the annual debt service used in evaluating the revenues is to be
the maximum amount for any fiscal year thereafter. Table 4-6 presents the annual totals of principal and
interest amounts due on bonds currently outstanding. The calculation of the debt service coverage ratio in
Table 4-5 is based on the total maximum debt service expense in any fiscal year. The FY 2013 calculation
was based on the total FY 2016 debt service expense of $3,401,954.
4.2 Status of Revenue Bonds
At the end of FY 2013, the City had two series of outstanding electric revenue bonds that were issued
pursuant to the Resolution. On July 1, 2008, the City issued $22,200,000 in Electric Revenue Bonds
(2008 Bonds). The proceeds from the sale of the 2008 Bonds were used (i) to finance or reimburse the
City of Dover, Delaware 4-7 Burns & McDonnell
Page 53
2014 Engineering Consultant’s Report Financial Assessment
City for improvements to the City’s electric system; (ii) to fund a Debt Service Reserve Fund; and (4) to
pay the costs of issuance of the 2008 Bonds.
On November 17, 2010, the City issued $8,810,000 of Electric Revenue Refunding Bonds (Series 2010).
The proceeds from the sale of the Series 2010 Bonds were used (i) to refund the Series 2004 Bonds, and
(ii) to pay the costs of issuance of the Series 2010 Bonds. The non-taxable Series 2010 Bonds received an
underlying rating of Aa2 by Moody’s Investors Services and an underlying rating of A+ by Fitch Ratings.
Table 4-6 illustrates the debt service schedule for the Series 2008 and 2010 Bonds. The principal and
interest and the annual total are shown for each series of bonds. At the time of issuance of the Series 2010
Bonds, the combined outstanding principal balance for both series of bonds was $30,280,000.
Table 4-6: Debt Service Schedule of Electric Revenue Bonds
2008 Electric Revenue Bonds 2010 Electric Revenue Refunding Bonds Total Annual
Period Principal Interest Debt Service Principal Interest Debt Service Debt Service
FY 2014 430,000 986,454 1,416,454 1,740,000 219,100 1,959,100 3,375,554
FY 2015 450,000 964,954 1,414,954 1,810,000 166,900 1,976,900 3,391,854
FY 2016 475,000 942,454 1,417,454 1,890,000 94,500 1,984,500 3,401,954
FY 2017 695,000 918,704 1,613,704 - - - 1,613,704
FY 2018 730,000 883,954 1,613,954 - - - 1,613,954
FY 2019 765,000 847,454 1,612,454 - - - 1,612,454
FY 2020 800,000 815,706 1,615,706 - - - 1,615,706
FY21-34 16,325,000 6,618,185 22,943,185 - - - 22,943,185
Total $21,470,000 $ 15,013,223 $36,483,223 $ 8,810,000 $ 911,867 $ 9,721,867 $46,205,090
4.3 Insurance
The City maintains a comprehensive insurance program to insure against varying types of liabilities and
significant losses related to various Electric Division properties. Section 706 of the Resolution reads:
"The City covenants that it will maintain a practical insurance program, with reasonable terms,
conditions, provisions and costs, which the City Manager determines, with the approval of the
Engineering Consultants, will afford adequate protection against loss, including loss of Revenues,
caused by damage to or destruction of the Electric System or any part thereof and also
comprehensive public liability insurance on the Electric System for bodily injury and property
damage in such amounts as may be approved by the Engineering Consultants.”
Table 4-7 summarizes itemized insurance coverage procured by the City for the period July 1, 2013,
through June 30, 2014. Burns & McDonnell has reviewed this list of insurance, and in the opinion of
City of Dover, Delaware 4-8 Burns & McDonnell
Page 54
2014 Engineering Consultant’s Report Financial Assessment
Burns & McDonnell, as Engineering Consultant and not as insurance counselor, the insurance in full
force and affect appears to satisfy the requirements of Section 706 of the Resolution.
Table 4-7: Schedule of Insurance Coverage in Effect
July 1, 2013 -
Starr Technical Risks Agency June 30, 2014
Coverage
Property
Earth Movement -Per Occurrence and in the $20,000,000
Annual Aggregate, except
Earth Movement in High Hazard Earth Movement EXCLUDED
Zones;
Earth Movement in California; EXCLUDED
Flood -Per Occurrence and in the Annual 10,000,000
Aggregate;
Accounts Receivable; 100,000
Business Interruption; EXCLUDED
Contingent Time Element Coverage; EXCLUDED
Debris Removal (or 25% of Direct Property Loss, whichever the greater); 2,500,000
Demolition and Increased Cost of Construction; 10,000,000
EDP Media; 1,000,000
Errors and Omissions; 2,000,000
Expediting Expense; 1,000,000
Extra Expense, excluding replacement power or increased cost of generation, 2,000,000
transmission and/or distribution of electricity, water or natural gas;
Fire Department Service Charges and Extinguishing Expenses; 500,000
Hazardous Substances -Per Occurrence and in the Annual Aggregate; 500,000
Inland Transit; 2,500,000
Newly Acquired Locations -90 Days reporting; 1,000,000
Personal Property Temporarily Off Premises; 100,000
Professional Fees; 250,000
Incidental Course of Construction; 5,000,000
Miscellaneous Unnamed Locations (except perils of Flood, Earth Movement and 500,000
Valuable Papers and Records; 100,000
Deductibles
For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its
own account an initial amount of:
In respect of Damage to Insured Property:
$350,000 per Occurrence, except;
$100,000 per Occurrence as respects Transit.
In respect of Time Element loss (Extra Expense):
45 days per Occurrence, except;
72 hours per Occurrence in respect of Service Interruption.
City of Dover, Delaware 4-9 Burns & McDonnell
Page 55
2014 Engineering Consultant’s Report Financial Assessment
July 1, 2013 -
XL Insurance June 30, 2014
Coverage
Property
per Occurrence and in the Annual Aggregate in respect of Flood; $ 10,000,000
per Occurrence and in the Annual Aggregate in respect of Earth Movement, 20,000,000
Excluded. per Occurrence and in the Annual Aggregate applicable in
High Hazard Movement zones;
per Occurrence and in the Aggregate in respect Hazardous Substance; 500,000
per Occurrence in respect of Business Interruption; EXCLUDED
per Occurrence in respect of Accounts Receivable; 100,000
per Occurrence in respect of scheduled, direct Contingent Time Element; EXCLUDED
per Occurrence in respect of Incidental Course of Construction; 5,000,000
(or 25.00% of the direct physical loss, whichever greater) per Occurrence in 2,500,000
respect of Debris Removal;
per Occurrence in respect of Demolition and Increased Cost of Construction; 10,000,000
per Occurrence in respect of Electronic Data Processing Media; 1,000,000
per Occurrence in respect of Errors and Omissions; 2,000,000
per Occurrence in respect of Expediting Expense; 1,000,000
per Occurrence in respect of Extra Expense excluding replacement power of 2,000,000
increased cost of generation, transmission and/or distribution of electricity,
water or natural gas;
per Occurrence in respect of Fire Department Service Charges and 500,000
Extinguishing Expenses;
per Occurrence in respect of Newly Acquired Locations (ninety (90) days 1,000,000
reporting);
per Occurrence in respect of property in Course of Inland Transit; 2,500,000
per Occurrence in respect of Miscellaneous Unnamed Locations, except: 500,000
Excluded. per Occurrence in respect of Flood;
Excluded. per Occurrence in respect of Earth Movement;
Excluded. per Occurrence in respect of Named Storm;
per Occurrence in respect of Valuable Papers and Records; 100,000
per Occurrence in respect of Personal Property Temporarily Off Premise. 100,000
Deductibles / Retentions
For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its
own account an initial amount of:
In respect of Damage to Insured Property:
$350,000, Per Occurrence, except;
$100,000, per Occurrence as respect Transit;
In respect of Time Element loss (Extra Expense):
45 days per Occurrence except;
72 hours Per Occurrence in respect of Service Interruption
4.4 Operating and Reserve Accounts
The Electric Revenue Fund and the Electric Improvement & Extension (I&E) Fund are the City’s two
funds devoted to the Electric Division. The funds are used to manage cash and transactions related to
utility operations and capital expenditures, respectively. Each fund includes certain cash accounts
established to make moneys available for specific purposes when they are needed. The accounts
maintained within the Revenue and I&E Funds are listed herein.
City of Dover, Delaware 4-10 Burns & McDonnell
Page 56
2014 Engineering Consultant’s Report Financial Assessment
Electric Revenue Fund
Insurance Reserve Account
Contingency Reserve Account
Electric Rate Stabilization Reserve Account
Interest and Sinking Account
Electric Improvement & Extension Fund
Depreciation Reserve Account
Future Capacity Reserve Account
The following are descriptions of each Fund, their respective accounts and their purposes.
4.4.1 Electric Revenue Fund
The Electric Revenue Fund was established in Section 503 of the Resolution. All revenues are to be
deposited into the Electric Revenue Fund when received. Current expenses are to be paid and other
accounts are to be maintained from the Electric Revenue Fund. Moneys are transferred from the Electric
Revenue Fund to the Electric Rate Stabilization Reserve Account, the Interest and Sinking Account, the
I&E Fund, the Depreciation Reserve Account, and the Future Capacity Reserve Account.
4.4.1.1 Insurance Reserve Account
The Insurance Reserve Account was established by the City to fund insurance deductibles in the event of
loss(es) covered by the City’s insurance policies then in effect. The target minimum balance in the
Insurance Reserve is $350,000. The reserve balance at the end of FY 2013 was $733,043. Dover will be
proposing raising the minimum balance from $350,000 to $750,000 per insurance carrier recommendation
in order to reduce premiums. This proposal will be taken to City Council in 2014.
4.4.1.2 Contingency Reserve Account
The Contingency Reserve Account was established by the City in FY 2003 to provide for unplanned
expenditures that may not be avoidable. The City’s Financial Policies require that a minimum balance be
maintained in the Contingency Reserve Account equal to 1.0 percent of the current year revenues for the
Electric Revenue Fund. The FY 2013 year-end balance was $814,236, which is equal to 0.92 percent of
the FY 2013 revenues for the Electric Revenue Fund.
City of Dover, Delaware 4-11 Burns & McDonnell
Page 57
2014 Engineering Consultant’s Report Financial Assessment
4.4.1.3 Electric Rate Stabilization Account
The Electric Rate Stabilization Reserve Account was established in FY 2005 to offset the costs of the
power cost adjustment to the customers of Dover. The account’s target balance is a minimum of 3.0
percent, not to exceed 10.0 percent, of purchase power cost in any given year. Any excess of this amount
will be refunded to customers in future years by reducing the rate of the power cost adjustment. The
account’s FY 2013 end-of-year balance was $17,382,124, which was 31.2 percent of the FY 2013
purchased power cost.
4.4.1.4 Interest and Sinking Account
The Interest and Sinking Account was established in Section 507 of the Resolution. This account consists
of two restricted accounts: the Bond Service account and the Reserve Account. The Bond Service
Account is funded with equal monthly transfers from the Electric Revenue Fund such that the balance, as
of each payment date for interest or for principal and interest, will be equal to the amount of the payment
due. The payments of principal and interest due on bonds are made from the Bond Service Account. The
Reserve Account is funded by transfers from the Electric Revenue Fund, as necessary, to maintain a
balance equal to the maximum combined principal and interest for any future fiscal year through the life
of all bonds then outstanding. Moneys in the Reserve Account are used for paying interest on and
principal of bonds when the balance in the Bond Service Account is insufficient for making those
payments. Excess moneys in the Reserve Account are also used towards paying current interest payments.
The total amount in the Restricted Accounts for the 2008 and 2010 bonds as of June 30, 2013, was
$3,522,833.
4.4.2 Electric Improvement and Extension Fund
The I&E Fund was established in Section 507 of the Resolution. Funds are added to the I&E Fund from
the Electric Revenue Fund to the extent that the amount of funds available from the Electric Revenue
Fund exceeds the total of the amounts required to be added to the Interest and Sinking Account. The I&E
Fund also receives additional funding from the Depreciation Reserve Account, the Future Capacity
Reserve Account, and from development receipts. Section 510 of the Resolution indicates that, except for
certain situations, moneys held in the I&E Fund are to be used only for payment of costs of unusual
maintenance or repairs, renewals or replacements, obtaining or replacing equipment, constructing
extensions, additions, or improvements, and engineering expenses related to the foregoing activities.
4.4.2.1 Depreciation Reserve Account
The Depreciation Reserve Account represents moneys that have been set aside for the sole purpose of
funding renewals and replacements of the Electric System as components or equipment wear out,
City of Dover, Delaware 4-12 Burns & McDonnell
Page 58
2014 Engineering Consultant’s Report Financial Assessment
deteriorate, or otherwise become unsuitable for the intended purpose. Transfers from the Electric Revenue
Fund and investment earnings are the only sources of additional moneys for the Depreciation Reserve
Account. Transfers to the I&E Fund are made as necessary to fund capital projects. The target
appropriation for the Depreciation Reserve Account each year is the excess of depreciation expense for
the year over the amount of principal included in debt service payments made during the year. The
reserve balance at the end of FY 2013 was $9,855,704.
4.4.2.2 Future Capacity Reserve Account
The Future Capacity Reserve Account was established to set aside and accumulate funds from the Electric
Revenue Fund for use in evaluating and pursuing activities related to the Electric Division’s alternatives
for power supply resources for future demand for electricity. The original target balance for this reserve
was $5,000,000. The reserve balance at the end of FY 2013 was $10,004,190.
Table 4-8 presents FY 2011 through FY 2013 year-end summaries of the activity within the cash accounts
described above. The Insurance Reserve Account, the Contingency Reserve Account, the Electric Rate
Stabilization Reserve Account, and the Interest and Sinking Account are accounts within the Electric
Revenue Fund. The Depreciation Reserve Account and the Future Capacity Reserve Account are accounts
within the I&E Fund.
City of Dover, Delaware 4-13 Burns & McDonnell
Page 59
2014 Engineering Consultant’s Report Financial Assessment
Table 4-8: Reserve Account Activity and Balances
Insurance Contingency Electric Rate Bond Depreciation Future
Reserve Reserve Stabilization Reserve Reserve Capacity
Account Account Account Account Account Account
Year Ended June 30, 2011
Balance in Account on July 1 $ 396,530 $ 1,039,766 $ 4,776,519 $ 3,337,822 $ 8,021,155 $ 9,023,928
Receipts
Interest Earned 6,804 17,022 83,648 108,706 141,066 154,843
Appropriations - - 1,300,000 3,588,881 2,250,000 -
Total Funds Available $ 403,334 $ 1,056,788 $ 6,160,167 $ 7,035,409 $ 10,412,221 $ 9,178,771
Disbursements
Debt Service Payments - - - (3,516,027) - -
Transfer to Capital Projects - - - - -
Balance in Account on June 30 $ 403,334 $ 1,056,788 $ 6,160,167 $ 3,519,382 $ 10,412,221 $ 9,178,771
Year Ended June 30, 2012
Balance in Account on July 1 $ 403,334 $ 1,056,788 $ 6,160,167 $ 3,519,382 $ 10,412,221 $ 9,178,771
Receipts
Interest Earned 4,661 14,026 69,966 3,451 129,837 126,711
Appropriations - - 5,000,000 - - -
Total Funds Available $ 407,995 $ 1,070,814 $ 11,230,133 $ 3,522,833 $ 10,542,058 $ 9,305,482
Disbursements
Debt Service Payments - - - (500,000) -
Transfer to Capital Projects (70,730) - (1,000,000) - (300,000) 500,000
Balance in Account on June 30 $ 337,265 $ 1,070,814 $ 10,230,133 $ 3,522,833 $ 9,742,058 $ 9,805,482
Year Ended June 30, 2013
Balance in Account on July 1 $ 337,265 $ 1,070,814 $ 10,230,133 $ 3,522,833 $ 9,742,058 $ 9,805,482
Receipts
Interest Earned 10,178 16,022 151,991 3,224 172,146 153,208
Appropriations 385,600 - 12,400,000 3,375,534 - 2,100,000
Total Funds Available $ 733,043 $ 1,086,836 $ 22,782,124 $ 6,901,591 $ 9,914,204 $ 12,058,690
Disbursements
Debt Service Payments - (272,600) - (3,375,534) (58,500) (54,500)
Transfer to Capital Projects - - (5,400,000) - - (2,000,000)
Balance in Account on June 30 $ 733,043 $ 814,236 $ 17,382,124 $ 3,526,057 $ 9,855,704 $ 10,004,190
City of Dover, Delaware 4-14 Burns & McDonnell
Page 61
2014 Engineering Consultant’s Report Conclusions
5.0 CONCLUSIONS
In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed assessments
of the electric generating stations and the transmission and distribution system of the City Electric
Division. The investigations included interviews, observations, and reviews of FY 2013 expenditures and
FY 2014 budgets. In addition, an analysis of the balances of the Improvement and Extension Fund and
other funds benefiting the Electric Division was performed. Burns & McDonnell also reviewed the
adequacy of the revenues provided by the current retail rates in relation to the requirements of the City of
Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23,
1985. A high level assessment of the City’s insurance coverage related to the Electric Division was also
completed. Based on these reviews and assessments, it is Burns & McDonnell’s opinion that:
1. The City’s power generation facilities are being operated and maintained consistent with accepted
electric utility practice in the United States.
2. The design, construction, operation, and maintenance of the City's electric transmission and
distribution system and the associated facilities are consistent with current generally accepted
electric utility standards and over the past few years. The system has been upgraded in order to
improve operation and service to customers.
3. The Electric Division capital projects included in the City’s Capital Investment Plan and the FY
2014 Operating Budget are necessary and should provide improved reliability and power quality
for the Electric System.
4. The balances as of June 30, 2013 for the various reserve funds maintained by the City for the
Electric Division appear to be sufficient for their defined purposes.
5. The insurance coverage in full force and affect as maintained by the City related to the various
assets of the Electric Division appears to satisfy the requirements of Section 706 of the
Resolution.
6. The electric revenues generated by the City’s current retail rates are more than sufficient to fulfill
the debt service coverage requirement defined in Section 502(c) of the Resolution.
City of Dover, Delaware 5-1 Burns & McDonnell
Page 62
Burns & McDonnell World Headquarters
9400 Ward Parkway
Missouri City, MO 64114
Phone: 816-333-9400
Fax: 816-333-3690
www.burnsmcd.com
Burns & McDonnell: Making our clients successful for more than 100 years
Page 63
The Energy Authority, Inc.
Monthly Management Committee Update – April 2014
May 22, 2014
Prepared by:
Robert Trinnear
Client Services Manager
904.360.1309
rtrinnear@teainc.org
Page 64
TABLE OF CONTENTS
I. Executive Summary 1
II. Budget Report 12
III. Operations Management 15
IV. Appendix 29
i
Page 65
I. Executive Summary
A. Power Supply Summary:
Overall Power Supply costs were $267,987 under budget due to lower hedge prices and a
prior month adjustment which lowered energy costs.
Dover’s budgeted cost for all power supply (capacity AND energy) was $83.79/MWh.
The actual cost of all power supply (capacity AND energy) was $80.06/MWh.
The cost of energy alone was $42.63/MWh, versus a budgeted energy cost of $49.20.
Dover’s hedge purchases totaled 41,280 MWh, which was 79% of the actual load. The
budgeted hedge purchase totaled 26,720, which was 50% of the budgeted load.
Dover’s power purchases from hedge transactions totaled $1,977,556. Purchases from
PJM (energy and fees) totaled $593,382 which included DA Energy purchases totaling
$154,447 and Reactive Services Charges totaling $116,655.
Dover’s total load was 52,517 MWh versus a forecasted load of 53,377 MWh.
Dover’s planned energy purchase from the SunPark solar installation was 2,100 MWh.
Dover’s actual energy purchase from the SunPark installation was 1,999 MWh.
1
Page 66
Supply Source Summary:
Supply Variance:
Budget Actual Variance
Gross Load 53,377 52,517 860
Wholesale Load 51,277 50,518 759
Hedged Volume (MWh) 26,720 41,280 (14,560)
Unhedged Volume (MWh) 24,557 9,238 15,319
Dover SunPark Volume (MWh) 2,100 1,999 101
Renewable Energy Credits Volume 315 202 113
Hedged Cost ($/MWh) $ 55.67 $ 47.91 $ 8
Unhedged Energy Cost ($/MWh) $ 38.93 $ 6.10 $ 33
Solar Energy Cost ($/MWh) $ 87 $ 102 $ (15)
Energy Costs ($/MWh) $49.20 $42.63 $6.57
All-in Costs - Energy, Capacity and RECs ($/MWh) $83.79 $80.06 $3.73
2
Page 67
B. Generation Summary:
Dover generated 1032 MWh in the month. Net generation revenue was $865,107 vs. a
budget of $909,320.
3
Page 68
Generation Breakdown:
City of Dover
Monthly Wholesale Generation
April 2014
Net Generation
1031.91
All In Generation
PJM - Generation
Economic and Reliability Dispatch $ 61,669.61
Generation Capacity Credit $ 1,286,250.00
Black Start and Transmission Losses $ 45,238.81
Natural Gas & Oil Consumption
Purchases for Generation $ (67,156.02)
Natural Gas Transport $ (9,230.25)
Eastern Shore Cashout $ 4,053.10
Oil Consumption $ -
Production Margin
PJM - Generation
Economic and Reliability Dispatch $ 61,669.61
Natural Gas & Oil Consumption
Purchases for Generation $ (67,156.02)
Natural Gas Transport $ (9,230.25)
Eastern Shore Cashout $ 4,053.10
Oil Consumption $ -
Gross Production Margin $ (10,663.56)
$/MWh Generation Production Gross Margin $ (10.33)
4
Page 69
C. Emissions Summary:
Emissions Allowance Summary through April 30, 2014
McKee Run3 did operate during the month of April for testing, so there were additional
emissions during this period.
CAIR EMISSION ALLOWANCE SUMMARY
SO2 NOx Allowances1
Date Action
Allowances Seasonal Annual
1/1/09 2008 Carryover 3,240 0 0
1/1/09 2009 Allocation 2,723 53 80
2/1/10 2010 Allocation 2,039 50 78
1/1/11 2011 Allocation 1,988 49 78
4/1/11 2011 Reallocation 2 4
1/11/12 2012 Allocation 1,988 51 80
10/4/2012 2013 Allocation 1,988 49 76
2014 Allocation 1,988 49 76
9/29/09 SO2 Sales (1,500)
11/12/09 NOx Ann. Sales (45)
11/13/09 SO2 Sales (1,410)
11/20/09 NOx Seas. Sales (25)
12/31/09 2009 Emissions2 (1) (6) (13)
12/31/10 2010 Emissions 0 (54) (54)
10/31/10 EPA Linearity Testing Req. (68) (68)
2011 2010 Deficit NOx Purchases 53 22
Aug 2011 Revised 2010 ECMPS data 30 30
Nov 2011 NOx Seas. Sales (DEMEC) (1)
12/31/11 2011 Emissions2 (1) (32) (36)
12/31/12 2012 Emissions2 (1) (37) (37)
Nov 2012 NOx Seas. Sales (DEMEC) (2)
2/13/2013 NOx Annual. Sales (DEMEC) (3)
11/15/13 NOx Annual Sales (DEMEC) (5)
12/31/13 C.Y.T.D. 2013 Emissions (0) (20) (20)
4/30/14 2014 YTD Emissions (1) 0 (8)
REMAINING ALLOWANCES 13,040 99 242
On August 21, 2012, a three-judge panel of the U.S. District Court of Appeals (DCA) in
Washington vacated EPA’s Cross State Air Pollution Rule (CSAPR) which would have
become effective on January 1, 2012. The DCA instructed EPA to continue
1
Per CAIR, starting in 2009, NOx emissions are governed by a seasonal and annual program.
2
Under CAIR, pre-CAIR SO2 allowances are retired at a rate of 2 allowances for each ton emitted. It is
assumed that pre-CAIR allowances will be retired before CAIR allowances.
5
Page 70
administering the Clean Air Interstate Rule (CAIR). EPA appealed the DCA ruling to the
U.S. Supreme Court, which heard arguments on December 10th, 2013.
On April 29th, 2014, the U.S. Supreme Court overturned the DCA opinion; however it did
not immediately reinstate CSAPR. It sent the rule back to the DCA for further action
consistent with the Supreme Court’s opinion. EPA will continue to administer CAIR
until the DCA takes action and EPA is able to respond.
Market liquidity for CAIR allowances continues to be low, with few transactions
occurring. The following table shows estimated values for Dover’s banked allowances,
based on settlement prices on the Intercontinental Exchange (ICE).
Mark-to-Market for CAIR Allowances (May/16/2014)
Commodity $/Ton Tons Extended
(Bid/Offer Avg.) Value
SO2 Allowances (2009 & earlier) $ 1.35 5,089 $ 6,870
SO2 Allowances (2010-13) $ 0.85 7,951 6,758
NOx Allowances - Seasonal $23.00 99 2,277
NOx Allowances - Annual $53.00 242 12,826
TOTAL $28,731
Regional Greenhouse Gas Initiative
The State of Delaware is a participant in the Regional Greenhouse Gas Initiative (RGGI).
The City of Dover must comply with RGGI by surrendering carbon dioxide (CO2)
allowances pursuant to the State of Delaware’s laws (Title 7, Chapter 60, Sub-Title II-A).
Delaware has elected a combined emissions allowance allocation/auction mechanism for
RGGI, in which 40% of CO2 allowances were allocated to sources for 2009, declining by
8% per year so that by 2014, all CO2 allowances are auctioned.
Dover had more than a sufficient number of RGGI allowances allocated to it to cover its
requirements through the first compliance period (calendar years 2009-2011). Any
unused allowances are carried over (“banked”) for subsequent years. The table below
shows RGGI allowance allocations, deductions and the cumulative balance by year
(column 8).
6
Page 71
CO2 Allowance Summary (2/28/2014)
1 2 3 4 5 6 7 8
CO2 Allowances Annual
CO2 CO2 (Per Facility, Allocated Cumulative
CO2 Tons CO2
Allowance Allowances Prior to Sale) CO2
Vintage Sold YTD Allowances
Emitted Allowance Balance
McKee Balance
VanSant
Run
2009 0 60,128 2,056 62,184 (5,796) 56,388 56,388
2010 0 48,102 1,645 49,747 (32,971) 16,776 73,164
2011 0 36,077 1,234 37,311 (17,763) 19,548 92,712
2012 0 27,058 925 27,983 ( 15,265) 11,793 104,505
3
2013 0 15,032 514 24,818 (10,231) 16,091 119,091
2014 0 -0- -0- -0- (5,344) 113,748
Dover no longer receives allocations of RGGI allowances. The Cumulative Balance
(column 8) – aka “Banked Allowances”) can be utilized for generation in 2014 and future
years. Once the banked allowances have been fully utilized, Dover will be required to
purchase RGGI allowances through the auctions or through over-the-counter markets.
Assuming that Dover does not sell any banked allowances, it will be able to maintain a
positive balance through 2016–2025, depending on actual annual energy production in
2012 and beyond.
On February 7, 2013, RGGI proposed changes to its Model Rule. The Delaware
Department of Natural Resources published the final rule on December 1, 2013 the
Delaware Register of Regulations with an effective date of December 11, 20134. The
new RGGI rule includes a provision which eliminates some portion of banked allowances
in future years.
Dover could elect to sell all or a portion of its banked allowances now and re-acquire
allowances at a later date; however TEA is currently of the opinion that Dover will be
better off retaining its banked allowances for use during future compliance years.
The most recent RGGI auction occurred on March 5th, 2014; the auction cleared at
$4.00/ton. The next auction will occur on June 4th, 2014. RGGI futures settlement
prices posted on Intercontinental Exchange (ICE) on May 16th, 2014 ranged from $4.45
to $4.70/ton, depending settlement month and vintage. Based on the May 16th, 2014
3
Includes Q3 2013 allocations of 7,846,757 for McKee Run and 1,424,677 for VanSant.
4
http://regulations.delaware.gov/register/december2013/final/17%20DE%20Reg%20644%2012-01-13.pdf
7
Page 72
ICE for June, 2014, Vintage 2013 ($4.47/ton), the value of Dover’s existing 114,634
ton RGGI allowance bank is $512,414.
Renewable Energy Certificates
Dover owns two photovoltaic systems totaling 15 kW, consisting of (one 5 kW unit at the
Utilities Administration Building and two 5 kW units at the McKee Run generating
station. Dover also receives solar energy produced by the 10 MW Dover Sun Park which
is owned by White Oak Solar Energy, LLC. In addition to the all of the physical energy
produced by the Sun Park, Dover receives 15% of Sun Park’s SRECS. Through the end
of February 2014, Dover has accumulated a total of 7,004 SRECS from these renewable
energy resources.
The nearest viable market for Dover’s SRECs is Pennsylvania. Pennsylvania’s April 15,
2014 SREC auction cleared separately for 2012/2013 through 2013/2014 vintage
allowances. Clearing prices and Dover’s SREC market value estimate are shown in the
table below.
SREC Vintage
Auction Clearing Price SREC Quantity Market Value
(June 1 – May 31)
$ 4.01
2010/2011 13 $ 52
(Aug-13 Auction)
$ 40.01
2011/2012 2,375 95,024
(Jan 2014 Auction)
$40.00
2012/2013 2,725 109,000
(April 2014 Auction)
$51.00
2013/2014 2,095 106,845
(April 2014 Auction)
TOTAL 7,208 $310,921
TEA continues to recommend to Dover to retain these allowances for compliance with its
Renewable Portfolio Standard which DEMEC is working on. Once Dover has an
approved RPS in place, it may be required to retire a portion of its current SREC balance
for compliance in the 2012/13 future compliance year. Any remaining SRECs could be
used for the 2013/14 compliance year.
NOTE: SRECs in both Delaware and Pennsylvania expire without value after 3 years.
Dover currently has thirteen (13) 2010/2011. Based on a recent discussion with DEMEC
staff, this expiration provision is not likely to be of concern within the current compliance
year.
If Dover has not accumulated adequate non-solar RECs, it will need to acquire some
from DEMEC for the 2013/2014 compliance year. DEMEC has told TEA that it will
likely have sufficient non-solar RECs for Dover’s requirements. Dover can purchase and
retire a portion of these non-solar RECs during the current compliance and fiscal years,
8
Page 73
or it can defer acquisition until the June – August, 2014 time frame, after the exact
amount of non-solar REC requirements is known.
D. Operations Management Summary:
During the month of April, there were no restricted work days or lost time accidents. The facility
has now gone 3 years and 196 days (1,291 days) through April, 2014 without an OSHA Recordable
Accident or a Lost Time reportable accident. There were no Near Miss incidents during the month.
The plant received no Notice of Violations (NOVs) during the month. The April (March
Discharge) DMR was submitted for the McKee Run site with no NPDES exceedences. There
were no opacity deviations during the month.
During the month of April, there was one IWW discharge to the Kent County Sewer. Sampling
occurred on 4/21/2014 and laboratory analytical data is expected the week of May 16, 2014.The
March SIU Report was submitted to Kent County. The DNREC SLEIS (Air Emission Inventory
Report) was submitted on April 30, 2014. Plant-wide hearing and respiratory testing was
completed. Four individuals attended the annual DOT/RCRA refresher course on April 17, 2014.
E. Risk Management Summary:
Forward power prices in PJM are higher than last month, especially later in the hedging
time horizon.
The current projected cost of service is below:
Blended Cost Monthly Change
PY Hedge Ratio ($/MWh) ($/MWh)
2013-14 79% $ 51.17 $ (0.81)
2014-15 70% $ 46.58 $ (0.39)
2015-16 55% $ 43.92 $ 0.38
2016-17 18% $ 43.56 $ 0.93
2017-18 10% $ 45.37 $ 1.39
9
Page 74
II. Budget Report
Variance Report:
Budget Actual Variance
Apr-14 Apr-14
Gross Load 53,377 52,517 860
Power Supply
Hedged Energy $1,487,372 $1,977,556 ($490,184)
PJM - Energy, Congestion & Losses $955,908 $56,383 $899,525
PJM - ARR, Transmission and Fees $395,000 $536,999 ($141,999)
Dover SUN Park Energy $182,770 $204,781 ($22,011)
Dover SUN Park RECs $25,000 $28,882 ($3,882)
Management Fees $83,000 $83,000 $0
PJM - Capacity UCAP Obligated Purchased $1,343,442 $ 1,316,904.00 $26,538
Subtotal - Power Supply $4,472,492 $4,204,505 $267,987
Power Generation O&M
Plant O&M $407,510 $455,718 (48,208.00)
Subtotal Generation O&M $407,510 $455,718 ($48,208)
Power Generation Production Margin
PJM - Economic and reliability dispatch $0 ($61,670) $61,670
Fixed Fuel and Transport Charges $0 $72,333 ($72,333)
Subtotal Generation Production Margin $0 $10,664 ($10,664)
Power Generation Non-Production Revenue
PJM - Generation Capacity Credit ($1,286,250) $ (1,286,250.00) $0
Emissions Allowance Sales $0 $ - $0
PJM - Black Start & Transmission Losses ($30,580) $ (45,238.81) $14,659
Subtotal - Non-Production Revenue ($1,316,830) ($1,331,489) $14,659
SubTotal - All Generation ($909,320) ($865,107) ($44,213)
Total - Utilities Cost $3,563,172 $3,339,398 $223,774
Unit Costs
Total - Power Supply $83.79 $80.06 $3.73
Total - Power Generation ($17.04) ($16.47) ($0.56)
Final Cost of Service to City of Dover Ratepayers $66.75 $63.59 $3.17
10
Page 75
Variance Analysis:
Power Supply
Dover consumed 860 MWh less than forecast for the month.
PJM energy costs were lower than expected as below budget market prices
occurred during the month. Hedged costs were higher than forecasted due to an
additional layering in of hedges. PJM Fees were higher than budget.
Hedges were placed at below budget levels and lower market prices offset the
higher fees. This resulted in a net power supply cost of $80.06/MWh,
$3.73/MWh below budget.
For the month, the city realized a favorable variance of $267,987 for power
supply vs. the monthly budget.
Dover Sun Park generated 101 MWh less than forecast.
Generation
Power generation had an unfavorable budget variance of $44,213.
Plant O&M expenses had an unfavorable budget variance of $48,208 for the
month.
11
Page 76
YTD Variance Report:
Budget Actual Variance
YTD YTD
Gross Load 616,999 638,850 (21,851)
Power Supply
Hedged Energy $20,907,344 $24,506,047 ($3,598,703)
PJM - Energy, Congestion & Losses $10,083,536 $14,251,611 ($4,168,075)
PJM - ARR, Transmission and Fees $3,950,000 $6,676,599 ($2,726,599)
Dover SUN Park Energy $1,195,473 $1,380,541 ($185,068)
Dover SUN Park RECs $250,000 $295,076 ($45,076)
Management Fees $830,000 $830,000 $0
PJM - Capacity UCAP Obligated Purchased $13,613,549 $13,361,950 $251,599
Subtotal - Power Supply $50,829,902 $61,301,825 ($10,471,922)
Power Generation O&M
Plant O&M $4,418,905 $4,451,516 ($32,611)
Subtotal Generation O&M $4,418,905 $4,451,516 ($32,611)
Power Generation Production Margin
PJM - Economic and reliability dispatch ($230,472) ($5,432,915) $5,202,443
Fixed Fuel and Transport Charges $0 $2,199,196 ($2,199,196)
Subtotal Generation Production Margin ($230,472) ($3,233,718) $3,003,247
Power Generation Non-Production Revenue
PJM - Generation Capacity Credit ($13,034,000) ($13,034,000) $0
Emissions Allowance Sales $0 $0 $0
PJM - Black Start & Transmission Losses ($335,800) ($1,062,510) $726,710
Subtotal - Non-Production Revenue ($13,369,800) ($14,096,510) $726,710
SubTotal - All Generation ($9,181,367) ($12,878,713) $3,697,346
Total - Utilities Cost $41,648,536 $48,423,112 ($6,774,576)
Unit Costs
Total - Power Supply $82.38 $95.96 ($13.57)
Total - Power Generation ($14.88) ($20.16) $5.28
Final Cost of Service to City of Dover Ratepayers $67.50 $75.80 ($8.30)
12
Page 77
III. Operations Management
NAES Corporation
Dover, Delaware
April 2014
Monthly Report
Unit 3 Turbine Undergoing Overhaul in Spring 2014
13
Page 78
Table of Contents
1.0 Environmental, Health, and Safety
2.0 Financial
3.0 Operations
4.0 Maintenance
5.0 CIP
6.0 General Plant Information
7.0 Summary of NAES Performance
14
Page 79
1.0 Environmental, Health and Safety:
During the month of April, there were no restricted work days or lost time accidents. The facility
has now gone 3 years and 196 days (1,291 days) through April, 2014 without an OSHA Recordable
Accident or a Lost Time reportable accident. There were no Near Miss incidents during the month.
The plant received no Notice of Violations (NOVs) during the month. The April (March
Discharge) DMR was submitted for the McKee Run site with no NPDES exceedences. There were
no opacity deviations during the month.
During the month of April, there was one IWW discharge to the Kent County Sewer. Sampling
occurred on 4/21/2014 and laboratory analytical data is expected the week of May 16, 2014.The
March SIU Report was submitted to Kent County. The DNREC SLEIS (Air Emission Inventory
Report) was submitted on April 30, 2014. Plant-wide hearing and respiratory testing was
completed. Four individuals attended the annual DOT/RCRA refresher course on April 17, 2014.
Environmental, Health, and Safety Statistics
Month Fiscal Year to Date
(April) (7/1/13-6/30/14)
NOVs 0 0
Opacity Deviations 0 11
Environmental Deviations 0 0
OSHA Recordable 0 0
OSHA LTA's 0 0
First Aid cases 0 0
Restricted Workday Accident 0 0
Near Miss 0 2
Man Hours Worked 4,926.50 43,743.00
Date last OSHA Recordable 10/14/10
Date last Lost Time Accident 10/14/10
Days since last OSHA recordable 1,291
Days since last Lost Time Accident 1,291
15
Page 80
Emissions (NOx, CO2 & SO2) All data thru 4/30/14
NOx Summary – Ozone Season (May-Sep) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2011 1.8 1.5 31.4 1.4 36.1
2012 1.2 1.0 35.8 1.0 33.1
2013 1.1 1.7 19.3 1.3 23.4
2014 0.0 0.0 0.0 0.0 0.0
NOx Summary - Year (Jan-Dec) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2011 1.8 1.5 32.6 2.9 38.8
2012 1.2 1.1 35.8 1.0 36.9
2013 1.1 1.7 19.4 1.3 23.5
2014 0.5 0.5 4.8 2.9 8.7
SO2 Summary - Year (Jan-Dec) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2011 0.0 0.0 0.1 0.5 0.6
2012 0.0 0.0 0.0 0.1 0.1
2013 0.0 0.0 0.0 0.2 0.2
2014 0.0 0.0 0.4 0.6 1.1
CO2 Allowances Summary
CO2 CO2 CO2 Allowances Available Total CO2 CO2
Allowance Allowances (Per Facility, Prior to Tons Emitted Allowance
Vintage Sold YTD Sale) Balance
McKee Run VanSant
2009 0 60,128 2,056 5,796 56,388
2010 0 48,102 1,645 32,971 16,776
2011 0 36,077 1,234 17,763 19,548
2012 0 27,058 925 15,265 11,793
2013 0 22,879# 1,939# 10,231 14,587
2014 0 0 0 5,344 (5,344)
Total CO2 Allowance Balance 113,748
*Note: CO2 allowance values are provided by the RGGI CO2 Allowance Tracking System.
Note: All emissions (NOx, SO2 and CO2) totals for 2013 are unofficial.
#Note: Additional CO2 Emission Values were added to 2013 balances by RGGI COATS- 7,846.757 for
McKee Run and 1,424.677 for VanSant
16
Page 81
CAIR NOx Allowances Summary*
NOx Allowances
CAIR CAIR NOx Available Total NOx NOx Allowance Balance
CAIR NOx
NOx Allowances (Per Facility, Prior to Tons Emitted
Allowances
Allowance Sold YTD Sale) (Yr/ Season)
Purchased
Vintage McKee McKee
VanSant YTD VanSant
Run McKee Run - Run
(Yr/Season) (Yr/Season)
(Yr/Season) VanSant (Yr/Season)
2010 and
3*** 27/0 0/2
earlier
2011 0 77/48 5/3 33/31– 3/1 0/0 - 0/0 42/10 2/2
2012 2** 75/46 5/3 36/36 – 1/1 0/0 - 0/0 39/10 2/0
2013 5** 77/48 5/3 19/19 – 1/1 0/0 - 0/0 58/24 4/2
2014 0 71/46 5/3 5/0 - 3/0 0/0 – 0/0 66/46 2/3
Total NOx Allowance Balance 232/90 10/9
*Note – Emissions allowances are deducted according to oldest vintage first or unless otherwise directed.
**Note – The facility transferred Ozone Season allowances to a third party.
SO2 Allowances Summary
SO2 Allowances Available Total SO2 Tons
(Per Unit, Prior to Sale & Emitted – SO2 Allowances
SO2 Allowance SO2 Allowances
Reconciliation) U3 and U11 Balance
Vintage Sold - YTD
Unit #3 Unit #11 YTD
2010 and earlier 0 4815 276 0 5089
2011 0 1850 138 1 1988*
2012 0 1850 138 1 1988*
2013 0 1850 138 0 1988*
2014 0 1850 138 1 1987
Total SO2 Allowance Balance 13,040
*Note – Emissions allowances are deducted according to oldest vintage first, unless otherwise directed.
17
Page 82
2.0 Financial
Financial – Current Month
Month – April
Actual Budget Variance
Personnel 243,667 257,110 13,443
Materials & Supplies 17,351 16,610 (741)
Administrative Expenses 194,700 132,690 (62,010)
Total $455,718 $406,410 ($49,308)
Financial – Fiscal Year to Date
Number of Months – 10
Actual Budget Variance
Personnel 2,469,215 2,707,210 237,995
Materials & Supplies 164,841 196,275 31,434
Administrative Expenses 1,637,495 1,514,800 (122,695)
Total $4,271,551 $4,418,285 $146,734
2.1 Variance analysis:
The actual expenses for the month of April are $455,718 against a budgeted amount of
$406,410 for an unfavorable variance of $49,308 or 12.13%. The variance was due to the
following:
PERSONNEL EXPENSES – A favorable monthly variance of $13,443 was due to
having a less overtime and corresponding Labor Burdens. Overtime reduction resulted
from not filling shifts to full complement where vacancies due to flex time occurred.
MATERIALS AND SUPPLIES EXPENSES- An unfavorable monthly variance of
$741 was due to the timing of the water – sewer invoices. There were two (2) months
invoiced during the billing period for April.
ADMINISTRATIVE EXPENSES – An unfavorable monthly variance of $62,010 due
primarily to the timing of electricity monthly invoices and invoices for operator training
that were originally budgeted in May. There were two (2) months of electricity costs
invoiced during the billing period for April.
The forecasted expenses for this fiscal year are $5,809,593 expensed versus an approved
budget of $6,015,800 thereby realizing a 96.57% expenditure rate.
18
Page 83
3.0 Operations
Unit Operations / Outages / Trips; All units have been on spring outage since 0700
hours on March 3, 2014. Unit 3 has been run for testing four (4) times in the month of
April to try to balance the turbine generator after repairs had been made to the unit during
the overhaul.
Month April 2014
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0.0 0.0 24.732 24.732 0.0 24.372
Starts # 0 0 4 4 0 4
Gross Generation MWh 0.0 0.0 1,150.878 1,150.878 0.0 1,150.878
Net Generation MWh 0.0 0.0 1,040.065 1,040.065 0.0 1,040.065
Total Auxiliaries MWh 0.0 0.0 395.739 395.739 0.0 395.739
Auxiliaries purchased MWh 22.960 22.960 284.926 330.846 3.185 334.031
Fuel Gas Used MMBTU 0.0 0.0 14,310.388 14,310.388 0.0 14,310.388
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 0.0 0.0
Total Fuel MMBTU 0.0 0.0 14,310.388 14,310.388 0.0 14,310.388
Net Heat Rate BTU/KWh 0.0 0.0 13.759 13.759 0.0 13.759
Unit Trips # 0.0 0.0 0.0 0.0 0.0 0.0
Capacity Factor % 0.00 0.00 0.00 0.00 0.00 0.00
Availability Factor % 0.0 0.0 0.0 0.0 0.0 0.0
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 720.00 720.00 720.00 2,160.00 720.00 2,880.00
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Reserve Shutdown
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
HW Boiler Gas Usage MMBTU 0.0 0.0
Pilot Gas Usage MMBTU 0.0 0.0 0.0 0.0
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from fuel flow
instruments.
19
Page 84
2013-2014 Fiscal Year-to-Date - April
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 135.697 214.032 287.773 637.502 75.655 713.157
Starts # 7 7 20 34 20 54
Gross Generation MWh 959.877 1,413.560 17,575.585 19,949.022 2,615.094 22,564.116
Net Generation MWh 895.980 1,309.804 16,085.387 18,291.171 2,613.006 20,904.177
Total Auxiliaries MWh 358.547 463.504 3,313.873 4,135.924 40.967 4,176.891
Auxiliaries purchased MWh 337.273 379.803 1,824.119 2,541.195 38.150 2,579.345
Fuel Gas Used MMBTU 8,924.901 15,004.575 160,565.972 184,495.448 19,584.819 204,080.267
Fuel Oil Used MMBTU 5,504.840 4,463.354 36,178.243 46,146.437 15,380.547 61,526.984
Fuel Oil Used Gallons 38,567 31,228 252,473 322,268 108,053 430,321
Total Fuel MMBTU 14,429.741 19,467.929 196,744.215 230,641.885 34,965.366 265,607.251
Net Heat Rate BTU/KWh 15.641 14.141 12.613 14.131 13.198 13.898
Unit Trips # 1 1 0 2 5 7
Capacity Factor % 0.72 1.06 2.16 1.84 0.92 1.64
Availability Factor % 60.84 61.94 61.94 61.57 61.94 61.66
Commercial
% 0.95 0.04 0.01 0.13 0.0 0.10
Unavailability (CU)
Planned Outage Hours Hours 2,777.00 2,777.00 2,777.00 8,331.00 2,777.00 11,108.00
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 80.000 0.0 0.0 80.000 0.0 80.000
Reserve Shutdown
Hours 4,303.303 4,268.968 4,258.555 12,830.826 4,443.345 17,274.171
Hours
HW Boiler Gas Usage MMBTU 6,203.127 6,203.127
Pilot Gas Usage MMBTU 2,375.134 4,694.627 7,069.761 7,069.761
Fuel Oil Inventory
Monthly Monthly Fuel Monthly FY 13-14 Fuel FY 13-14
Inventory Inventory Purchases Inventory Inventory Purchases Inventory
(Start) (End) (Month) (Change) (Start) (YTD) (Change)
McKee Run
(#2 Fuel Oil) 461,775 462,656 0 881 454,725 378,003 7,931
VanSant
72,561 72,814 0 253 146,133 35,000 (73,319)
(#2 Fuel Oil)
Note: As measured by tank level instruments. Tank levels may change due to oil temperature.
VanSant Lifetime through April 2014
Actual Starts Factored Starts Fired Hours
VanSant 1350 2,311.25 4,306.00
Since HGP - Dec 2004 257 643.55 922.42
20
Page 85
Team Report:
Operations personnel continue to support maintenance by working on Preventative
Maintenance (PM) work orders and other work orders that they have the necessary skills
to successfully complete the task. The Operations Department continues to utilize the
Day Shift Worker in both the Operations and Maintenance areas to help in maintaining
the plant. In addition, the Operations staff continues to support maintenance activities
during the planned outage by serving as Confined Space Attendants for confined space
areas as well as other support tasks. The Operations staff has also supported the outage
Capacity Testing – FY 2013-2014
Summer 2013 (June 1- Aug 31) Winter 2013-2014 (Dec 1- Feb 28)
Unit Rated Net Reported Net Unit Rated Net Reported Net
Capability (MW) Capability (MW) Capability (MW) Capability (MW)
1 17 17.2 1 17 17.5
2 17 17.8 2 17 18.2
3 102 103.0 3 102 104.4
11 39 40.9# 11 39 44.05#
Total 175 178.9 Total 175 184.1
Note: * Denotes Unit is qualified for the PJM Winter Demonstration Period Exemption Program and
data has been submitted into the PJM eGADS
Note: # Depicts Net Corrected Capacity for Ambient Air Conditions – VanSant Unit only
by performing various LOTO tasks needed to test or place equipment in or out or service.
21
Page 86
4.0 Maintenance
During the month of April, the Plant Maintenance staff continued addressing the backlog
of work orders. There were forty-six work orders issued with eighty-three work orders
being completed during the month. No zero safety work orders were entered into the
plant’s Computerized Maintenance Management System (MP2) during the month. The
table below summarizes the monthly work order activities.
Work Order Report
April - 2014
Outstanding
From Outstanding
Previous Issued This Completed at the end of
Priority # Month Month This Month the month
1 17 3 3 17
2 74 8 23 59
3 40 3 5 38
4 5 0 0 5
5 15 0 1 14
SW1 0 0 0 0
SW2 0 0 0 0
SW3 0 0 0 0
SW4 0 0 0 0
SW5 0 0 0 0
PM 100 32 51 81
EM 0 0 0 0
Totals 251 46 83 214
Note: PM Work Orders are included in the priority totals
Notable activities during the month include:
NAES Maintenance Staff completed the removal and replacement of the Units 1 and 2 boiler
drain piping. The piping was replaced due to damage as a result of the lines freezing and
cracking during a extreme cold spell this past winter.
During the month, the turbine contractor completed the reassembly of the Unit 3 turbine. With
the reassembly complete, a third party vibration monitoring vendor was contracted to perform
vibration testing and balancing analysis. During the operation of the unit, it was determined that
a shaft sealing steam packing rub was occurring which was part of the cause of the unit
experience higher than normal vibration on the number three and two bearings. The turbine
contractor team and NAES Maintenance staff removed the IP and LP hood to access the packing.
The necessary repairs and adjustments were made to the packing and packing boxes and the
equipment reassembled in preparation for further testing.
22
Page 87
NAES IC&E Staff removed and replaced two charts recorders on Unit 3. The chart
recorders were obsolete and replacement parts were no longer available for them. New
digital recorders were installed and were tested for proper operation on all points.
5.0 Capital Improvement Projects (CIP)
Project
Description Update
Number
Progress: Cooling Tower decking is 100% complete. Inspection was
conducted in March as a precursor for CIP work scope development next
Unit #3 Cooling FY.
EG1402 Schedule: Inspection work completion and work scope is being
Tower Repairs
modified to reflect deficiencies found during inspection. Bid
requests and bid meeting to be set up for April-May time period.
McKee Run Progress: Work planned for the Fall is 100% complete.
Auxiliary Schedule: Remaining Fall outage items were completed in
EG1404
Component December. Spring activities started in March.
Replacement
VanSant Station Progress: Work planned for the Fall is 100% complete.
EG1405 Component Schedule: Project activities for this fiscal year have been completed.
Replacement
Progress: The recently completed hanger adjustments will need to
be checked with the unit in the hot (running) position.
McKee Run HEP Schedule: Final report was received which indicated one area that
EG1406
Pipe Repairs should be addressed in the near future. Plans are underway to
develop work scope to change out the section of pipe scheduled for
the fall of 2014
Progress: Work scope is still being developed for an RFP.
Metering System Schedule: Work activities are moving forward. Working with
EG1407
Upgrades vendor to finalize RFP documents for release in late May or early
June period.
McKee Progress: Work scopes are being developed for RFP(s) to be put out
EG1408 Run/VanSant Safety in June period. Will need to go out for bids once complete.
Compliance Items Schedule: Work activities are behind due to Fall Outage activities.
McKee Run Natural Progress: Work scheduled for the Spring Outage.
EG1409 Gas Block-Bleed Schedule: Work activities are back on track for a Spring Outage
Valves completion date. Expect to be complete in early May.
McKee Progress: Plant staff completed development of paint specifications
Run/VanSant and bid requests were received.
EG1413
Structural Schedule: Bids were received in early September. Work is on hold
Preservation due to budget restraints.
Unit 3 Turbine Progress: Work commenced and is ongoing. Rotor was removed and
EG1212
Repairs sent out to shop for 9th stage installation, inspection of the rotor, and
23
Page 88
balancing and has been returned and reinstalled. Testing continues
to determine balancing in-place.
Schedule: Rotor returned and was reinstalled upon arrival. Testing
of unit and balancing is underway.
Progress: Cost to be incurred due to repairs on Unit 1 Boiler and
McKee Run Units
turbine were completed in November.
EG1415 #1-#2 Component
Schedule: Other scope activities being evaluated due to the
Repairs
announcement to stop operation of Units 1 and 2 in 2016.
Progress: Submitted permit application to DNEC in March and
currently discussing possible permit limitation. Constructions Bids
were returned, evaluated and a recommendation provided to TEA
VanSant Capacity
EG1416 and to the COD. Approval of contractor is expected in early May.
Increase
Schedule: Construction vendor approval is on slate for early May
COD Council Meeting. Continuing to work with DNRC on permit
language and limits.
6.0 General Plant Information
On April 4th, 2014, Senior Operator Ricardo Barber celebrated 20 years with the power plant.
The plant held a congratulatory lunch in Rick’s honor on April 11, 2014.
Training:
Plant employees continue with General Physics safety training and environmental courses
to enhance their overall knowledge of permit and safety requirements.
Topics discussed during the monthly safety committee meeting were reviewed by the
entire staff. The monthly safety topic was on “Ten Rules to Preserve Ten Fingers”.
PJM Simulation training was completed on April 8-9 by a third party vendor. A total of
six operators and one Operations supervisor attended from McKee Run plant.
24
Page 89
Calendar of Events Date
EIA-860 Report TBD
EIA-923 Report TBD
NPDES Permit Expires (DNREC has Extended) March 4, 2014 (TBD)
Units 1, 2, and 3 Spring Outage March 3, 2014 – May 30, 2014
Unit 11 Spring Outage March 3, 2014 – May 30, 2014
Annual VanSant Black Start Test April, 2014
Air Emission Inventory April, 2014
NOx Ozone Season Starts May 1, 2014
PJM Summer Capacity Test Period June 1, 2014 – August 31, 2014
FY 2013-2014 Budget Year Ends June 30, 2014
Toxic Release Inventory (TRI) Annual Report July 1, 2014
Semi-Annual Title V Certification Due July 31, 2014
NOx Ozone Season Ends September 30, 2014
Units 1, 2, 3 and 11 Fall Outage October 1, 2014
Four Year Accident Free October 14, 2014
Winter Capacity Period December 1, 2014 to February 28, 2015
NOx Emissions Reconciliation Due March 1, 2015
SO2 Emissions Reconciliation Due March 1, 2015
SARA III / Tier II Report Due March 1, 2015
7.0 Summary of NAES Performance to Date
Plant Performance FY 2013-2014
Measure Month Year to Date YTD FY Maximum
Incentive Incentive
Commercial
0.0% 0.10% $91,087 $94,882
Unavailability (CU)
Safety 0 0 $17,790 $17,790
Environmental 0 0 $17,790 $17,790
Capacity Tests
Summer Winter Summer Winter
Completed
Unit 1 No No Yes Yes $3,559 $3,559
Unit 2 No No Yes Yes $3,559 $3,559
Unit 3 No No Yes Yes $21,349 $21,349
Unit 11 No No Yes Yes $7,117 $7,117
Total YTD
97.71% Total YTD Incentive $162,249 $166,045
Incentive %
Note: All units successfully completed the Summer and Winter Capacity (FY 2013-2104) Testing for PJM.
25
Page 90
IV. Appendix 1 – PJM Invoice Breakdown
Gen Load Grand Total
480-8102-592-95-49 Capacity Resource Deficiency ($2,826.00) ($2,826.00)
Capacity Transfer Rights ($18,612.90) ($18,612.90)
Incremental Capacity Transfer Rights ($1,632.90) ($1,632.90)
Locational Reliability $1,339,975.80 $1,339,975.80
480-8102-592-95-49 Total $ 1,316,904.00 $ 1,316,904.00
480-8102-592-95-50 RPM Auction ($1,286,250.00) ($1,286,250.00)
480-8102-592-95-50 Total $ (1,286,250.00) $ (1,286,250.00)
480-8102-592-95-90 Auction Revenue Rights ($25,818.00) ($25,818.00)
Balancing Operating Reserve $17,476.26 $17,476.26
Balancing Operating Reserve for Load Response ($19.19) ($19.19)
Black Start Service $1,842.44 $1,842.44
CT Lost Opportunity Cost Allocation ($16.80) ($16.80)
Day-Ahead Load Response Charge Allocation $2,285.96 $2,285.96
Day-ahead Operating Reserve $4,805.52 $4,805.52
Day-ahead Operating Reserve for Load Response $348.21 $348.21
Day-ahead Scheduling Reserve $1.12 $1.12
Demand Resource and ILR Compliance Penalty ($1,929.60) ($1,929.60)
Expansion Cost Recovery $408.30 $408.30
FERC Annual Recovery $3,617.97 $3,617.97
Generation Deactivation Refund ($735.06) ($735.06)
Load Management Test Failure ($42.90) ($42.90)
Load Reconciliation for Transmission Losses $4,310.92 $4,310.92
Market Monitoring Unit (MMU) Funding $209.03 $209.03
Michigan - Ontario Interface Phase Angle Regulators $176.99 $176.99
Network Integration Transmission Service $316,178.40 $316,178.40
Non-Firm Point-to-Point Transmission Service ($424.66) ($424.66)
Non-Synchronized Reserve $592.95 $592.95
North American Electric Reliability Corporation (NERC) $551.47 $551.47
Organization of PJM States, Inc. (OPSI) Funding $36.06 $36.06
PJM Scheduling, System Control and Dispatch Service - Advanced Second Control Center $1,365.13 $1,365.13
PJM Scheduling, System Control and Dispatch Service - Capacity Resource/Obligation Mgmt. $913.50 $913.50
PJM Scheduling, System Control and Dispatch Service - Control Area Administration $8,720.25 $8,720.25
PJM Scheduling, System Control and Dispatch Service - Market Support $2,037.93 $2,037.93
PJM Scheduling, System Control and Dispatch Service - Market Support Offset ($162.03) ($162.03)
PJM Scheduling, System Control and Dispatch Service - Regulation Market Administration $81.08 $81.08
PJM Scheduling, System Control and Dispatch Service Refund - Capacity Resource/Obligation Mgmt. ($28.50) ($28.50)
PJM Scheduling, System Control and Dispatch Service Refund - Control Area Administration ($345.43) ($345.43)
PJM Scheduling, System Control and Dispatch Service Refund - Market Support ($83.62) ($83.62)
PJM Scheduling, System Control and Dispatch Service Refund - Regulation Market Administration ($3.36) ($3.36)
PJM Settlement, Inc. $162.03 $162.03
Reactive Services $116,654.91 $116,654.91
Reactive Supply and Voltage Control from Generation and Other Sources Service $35,523.17 $35,523.17
Real-Time Load Response Charge Allocation $1,616.63 $1,616.63
Regulation and Frequency Response Service $15,527.91 $15,527.91
Reliability First Corporation (RFC) $783.36 $783.36
Synchronized Reserve $16,579.15 $16,579.15
Transmission Enhancement $9,972.34 $9,972.34
Transmission Owner Scheduling, System Control and Dispatch Service $3,829.29 $3,829.29
480-8102-592-95-90 Total $ 536,999.13 $ 536,999.13
480-8102-592-95-91 Balancing Spot Market Energy ($132,651.22) ($132,651.22)
Balancing Transmission Congestion ($5,916.77) ($5,916.77)
Balancing Transmission Losses ($3,270.53) ($3,270.53)
Day-ahead Spot Market Energy $549,022.30 $549,022.30
Day-ahead Transmission Congestion $33,549.02 $33,549.02
Day-ahead Transmission Losses $70,867.42 $70,867.42
Emergency Load Response $49.58 $49.58
Inadvertent Interchange ($101.37) ($101.37)
Load Reconciliation for Balancing Operating Reserve ($1,163.95) ($1,163.95)
Load Reconciliation for Day-ahead Scheduling Reserve ($53.76) ($53.76)
Load Reconciliation for FERC Annual Recovery ($414.60) ($414.60)
Load Reconciliation for Inadvertent Interchange $219.57 $219.57
Load Reconciliation for Market Monitoring Unit (MMU) Funding ($25.02) ($25.02)
Load Reconciliation for Non-Synchronized Reserve ($65.77) ($65.77)
Load Reconciliation for North American Electric Reliability Corporation (NERC) ($66.73) ($66.73)
Load Reconciliation for Organization of PJM States, Inc. (OPSI) Funding ($4.50) ($4.50)
Load Reconciliation for PJM Scheduling, System Control and Dispatch Service ($1,339.46) ($1,339.46)
Load Reconciliation for PJM Scheduling, System Control and Dispatch Service Refund $98.66 $98.66
Load Reconciliation for Reactive Services ($8,931.33) ($8,931.33)
Load Reconciliation for Regulation and Frequency Response Service ($2,385.81) ($2,385.81)
Load Reconciliation for Reliability First Corporation (RFC) ($95.17) ($95.17)
Load Reconciliation for Schedule 9-6 - Advanced Second Control Center ($180.31) ($180.31)
Load Reconciliation for Spot Market Energy ($386,460.60) ($386,460.60)
Load Reconciliation for Synchronized Reserve ($1,580.00) ($1,580.00)
Load Reconciliation for Synchronous Condensing ($0.03) ($0.03)
Load Reconciliation for Transmission Congestion ($27,963.55) ($27,963.55)
Load Reconciliation for Transmission Losses ($20,200.02) ($20,200.02)
Load Reconciliation for Transmission Owner Scheduling, System Control and Dispatch Service ($481.95) ($481.95)
Meter Error Correction ($4,071.28) ($4,071.28)
480-8102-592-95-91 Total $ 56,382.82 $ 56,382.82
480-8102-592-95-92 Balancing Spot Market Energy ($60,123.63) ($60,123.63)
Balancing Transmission Congestion ($92.58) ($92.58)
Balancing Transmission Losses ($1,453.40) ($1,453.40)
480-8102-592-95-92 Total -61669.61 -61669.61
480-8102-592-95-93 Reactive Supply and Voltage Control from Generation and Other Sources Service ($29,467.58) ($29,467.58)
Transmission Losses ($15,771.23) ($15,771.23)
480-8102-592-95-93 Total $ (45,238.81) $ (45,238.81)
Grand Total $ (1,393,158.42) $ 1,910,285.95 $517,127.53
26
Page 91
City of Dover
Electric Revenue Fund
FY14 - White Oak Solar Park Incremental Cost
Original
July August September October November December January February March April YTD Budget
Power Supply & Generation
Dover Sun Park - Energy $ 187,421 $ 176,372 $ 204,852 $ 120,839 $ 99,447 $ 64,684 $ 82,605 $ 101,681 $ 137,856 $ 204,781 $ 1,380,539 $ 1,565,800
Dover Sun Park - REC's 43,005 38,516 42,894 25,307 20,875 13,583 17,301 21,304 28,882 251,667 300,000
Total Power Supply Cost 230,426 214,888 247,746 146,146 120,322 78,267 99,906 122,985 166,738 204,781 1,632,206 1,865,800
Non-Solar Power Supply Cost (180,227) (154,545) (154,590) (100,770) (79,066) (52,006) (146,406) (90,909) (105,944) (158,303) (1,222,765) (1,186,411)
Incremental Energy Cost $ 50,199 $ 60,343 $ 93,156 $ 45,376 $ 41,256 $ 26,261 $ (46,500) $ 32,077 $ 60,794 $ 46,478 $ 409,441 $ 679,389
Revenues
Customer Sales - Electricity (9,404) (7,389) (7,538) (7,662) (7,721) (8,019) (8,071) (7,950) (7,648) (7,632) (79,034) (26,300)
Rent Receipts (14,446) - - (14,446) - - (14,807) - (34,450) - (78,149) (58,300)
Total Revenues (23,850) (7,389) (7,538) (22,108) (7,721) (8,019) (22,878) (7,950) (42,098) (7,632) (157,183) (84,600)
Incremental Sun Park Cost $ 26,349 $ 52,954 $ 85,618 $ 23,268 $ 33,535 $ 18,242 $ (69,378) $ 24,127 $ 18,696 $ 38,846 $ 252,258 $ 594,789
MWh Purchased/Generated - Solar 2,052.584 1,815.656 2,000.128 1,179.844 970.972 631.556 806.536 992.788 1,345.984 1,999.428 13,795.476 18,159.000
MWh $ Solar Energy $ 91.31 $ 97.14 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 100.07 $ 86.23
Solar REC's MWh 307.000 272.000 300.000 177.000 146.000 95.000 121.000 149.000 202.000 - 1,769.000
MWh $ Solar REC (one month lag)* $ 140.08 $ 141.60 142.98 142.98 142.98 142.98 142.98 142.98 142.98 $ - $ 142.27
MWh $ Non-Solar Energy $ 87.81 $ 85.12 $ 77.29 $ 85.41 $ 81.43 $ 82.35 $ 181.52 $ 91.57 $ 78.71 $ 79.17
Note: Solar REC's are one month behind due to the time the invoice is received.