Page 1
UTILITY COMMITTEE
AGENDA
JUNE 11, 2012 - 5:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. McKee Run Generating Station Industrial Wastewater Discharge System
2. Proposed Resolution No. 2012-11 - Adoption of the American Public Power Association (APPA)
Safety Manual
3. Annual Engineering Consultant's Report on the Operation and Maintenance of the Electric System -
Fiscal Year 2011
(Deferred by Committee on April 23, 2012 Due to Time Constraints)
4. FY 2013 Five-Year Capital Investment Plan (CIP)
(Deferred by Committee on April 23, 2012 Due to Time Constraints)
5. Review of Utility Related Capital Investment Plan (CIP) (Electric and Water/Wastewater)
6. Updates
A. Garrison Oak Technical Park Project
B. Green Energy Funding and Programming
C. National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm Sewer
Systems (MS4) Permit
7. Adjournment by 5:30 P.M.
/tm
S:\AGENDAS-MINUTES-PACKETS\Committee-Agendas\2012\06-11-2012 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE
THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
ACTION FORM
PROCEEDING: City Council
DEPARTMENT OF ORIGIN: Public Utilities- Power Plant (NAES) DATE SUBMITTED:
PREPARED BY: Vince Scire, Plant Manager
SUBJECT: NEW CIP – Industrial Waste Water Discharge System McKee Run Generating Station
and Exceptions in Capital Outlay
REFERENCE: NA
RELATED PROJECT: NA
REVIEWED BY:
EXHIBITS: Industrial Waste Water Discharge System CIP
Industrial Waste Water Discharge System Presentation
EXPENDITURE REQUIRED $272,000 AMOUNT BUDGETED: N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: New CIP to be approved with expenditures to begin in 2012 upon Council approval and be completed in 2013
RECOMMENDED ACTION: Staff recommends approving the new CIP and transfer of funding from existing CIPs as detailed in
the table below.
BACKGROUND AND ANALYSIS:
This project has been developed to address a change in wastewater discharge requirements identified during an internal program audit.
Three main items are being addressed simultaneously.
First, in the Fall of 2011, during a program assessment, it was identified that the McKee Run facility did not have metering in place
for its sanitary wastewater discharge. Additionally, it was identified that due to changes in the Kent County code, the facility needed
to apply for an Industrial Wastewater Discharge Permit (IWDP). Based on both these requirements, the facility needs to segregate its
industrial and sanitary sewer flows, meter both discharges, and sample the industrial flows per Kent County requirements.
Second, this project facilitates the diversion of the current National Pollutant Discharge Elimination System (NPDES) wastewater
discharges at outfalls 004 and 005 to the Kent County WWTP. During the same wastewater assessment, and based on operational
data supporting the decision to divert the flows, the cooling tower blowdowns will be re-routed from the McKee Run stream, to the
Kent County sewer. Minimal additional work in the project scope has been required to make this change which will provide
regulatory and operational flexibility to the facility during run times. The facility is at risk of not meeting the discharge parameters set
forth by the Delaware River Basin Commission (DRBC) in Docket No. D-2009-014 CP-1. After evaluating various methods to
comply, it was determined that the Kent County WWTP would be both willing and able to treat the cooling water discharge and this
could be added into the already required IWDP application. This would also alleviate the need for the facility to conduct a thermal
study of the discharge as required by the DRBC in the above Docket, a study which would likely provide no value, and cost in the tens
of thousands of dollars to conduct. In the past, due to the infrequent running of the cooling towers, bacterial growth (enterococci) has
been a NPDES permit limit of concern and great care must be taken to both disinfect and circulate the cooling tower water prior to
discharge. Diverting this discharge to the sanitary sewer alleviates this risk.
Third, as the wastewater discharge is currently routed, a large amount of dilution water must be sent to the cooling towers to maintain
the discharge concentrations of Total Dissolved Solids (TDS) to remain below permit limits as set by the DRBC. Based on current
data and calculations, and depending on the operating conditions, it is projected that water consumption will increase between 3 and
10 times to foster compliance. Additionally, it has been projected that if Unit 3 was to be called to run for an extended period of time
such as longer than 1 week, that the TDS parameter would eventually rise to a level exceeding the permit limit due to restrictions on
how much dilution water could be added. Permit non-compliance would be simply a matter of when, not if, under an extended
operating scenario. This increased water usage also directly contradicts the efforts the facility has made to conserve water, especially
in times of draught, when the extended operating scenario would be most likely to occur.
In summary, the benefits to implementing this project include:
Maintaining regulatory compliance with City of Dover and Kent County Code and allow for proper billing to take place
Maintaining Regulatory compliance with Kent County, DRBC, and DNREC regulations/permits
Page 3
Alleviate the risk of fines and or Notice of Violations (NOV’s) as it relates to the wastewater system
Eliminate exposure to future DRBC and DNREC regulatory requirements as it relates to the facility NPDES permit
Reduced water consumption that preserves the water conservation efforts made by the facility in recent years
Reduced water billing based on the projected dilution water amounts currently required
Continued safe and efficient operation of the facility
In the time since these needs were identified, an official application for an IWDP has been submitted to Kent County and the permit is
ready to finalize. The permit includes an exception, granted by Kent County Levy Court, to discharge the cooling water to the
sanitary sewer. The proposed permit also includes language specific to the McKee Run site that will allow for the operational
flexibility needed to run the facility as required by the current demands placed on it. Preliminary engineering has been completed for
the overall industrial wastewater system changes, and the site has developing estimated project costs based on the best available
information.
The next steps to be taken in the project are as follows:
Finalize Engineering for the project and submit to the City of Dover and Kent County for approval
Obtain final costs for both materials and labor based on the approved design
Obtain City of Dover approval for new project
Pre-Order materials & equipment ASAP
Schedule installation of system around projected run times and outage schedule(s)
Finalize Regulatory Process
Finalize Kent County IWDP (almost complete – working on final revisions)
Work with DNREC to convert NPDES to General Stormwater Permit
Negotiate DRBC docket modification and closure based on wastewater re-routing to Kent County
This is a new project that was not identified or funded in the original 2012 Capital Budget. In order to support the funding of this new
project , the table below identifies exceptions in Capital outlay for various original projects which will provide the needed offset in
funding:
Below is a table summarizing the budget impact of the proposed changes to the current approved Power Plant Capital budget:
Approved 2012 Proposed 2012
CIP Original Projects budget Budget Notes
Project workscope deferred to
EG1102 Units #1-#2 Cooling Tower Life Extension $25,410.00 $0.00 2014 due to run time
Work put on hold waiting for
decision on continued
EG1107 Units #1-#2 Boiler / Turbine Life Extension $196,331.00 $113,000.00 operation of Units 1 and 2.
EG1112 Unit #3 Air Heater Expansion Joint $82,807.00 $77,000.00 Project Complete
EG1113 Units #1-#2 Boiler Controls Upgrades $25,700.00 $28,000.00 Project Complete
EG1114 Unit #3 Gas Line Modifications $20,207.00 $16,000.00 Project Complete
EG1201 Unit #3 Boiler Air Heater $440,000 $395,000.00 Project Complete
EG1202 Unit #3 Boiler Systems $130,000.00 $121,000.00 Includes 40k for fuel
EG1203 Unit #3 ID and FD Fan Controls Upgrades $92,000.00 $81,000.00 Complete in May
Workscope to be deferred due
EG1206 McKee Run DI Controls Replacement $65,000.00 $0.00 to higher priority workscope
EG1208 MCKee Run Switchyard Blast Walls $50,000.00 $45,000.00 Project Complete
Reschedule to 2013 due to Unit
EG1210 Unit #3 Cooling Water Line Inspection $25,000.00 $0.00 run time
EG1211 Unit #3 Stack Repairs $25,000.00 $20,000.00 Project Complete
EG1212 Unit 3 Turbine Inspection $424,000 $405,000.00 Project closeout remaining
Total Original Projects $1,601,455 $1,301,000
Newly Proposed Project
EG12XX Industrial Waste Water System $272,000
Total New Projects $272,000
Revised Total $1,573,000.00
Page 4
City of Dover
PROJECT TITLE: McKee Run
Industrial Wastewater System
FISCAL YEAR(S): 2012-13
PROJECT NO: TBD
CATEGORY: Operations, Environmental
DEPARTMENT: Electric Generation
DEPT. RANKING: 1
NEW PROJECT? YES XX NO
PROJECT DESCRIPTION: Install system equipment needed for Industrial Wastewater discharge of McKee Run cooling towers blowdown
to Kent County Sewer System. All equipment required to meet Kent county permit requirements.
Scope activities include the following:
System Design (2012) - $30k , (2013)- $15k
Purchase of piping, support, pumps, motors, flow meters (2012 - $30k, 2013- $73k)
Tank Inspections and prep work (2013) - $10k
Installation (2013) - $114k
NEED, JUSTIFICATION, BENEFIT: This project is required to eliminate Non-Contact Cooling Water (NCCW) discharges to the McKee Run
and divert the flow to the Kent Count Sewer System. This would eliminate the need to install a more costly system to comply with the
Delaware River Basin Commission (DRBC ) Docket and the impending requirements of the Kent County Industrial Waste Water
Discharge permit affecting McKee Run.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: This project has been deemed to be a lower cost alternative to
addressing the DRBC docket requirements than a project that would be required to meet the DRBC Docket requirements currently in
place for the McKee Run Generating Station. Delay would result in additional costs associated with performing a thermal study and
subsequent Engineering study of streaming both during unit operations, as well as when the units are not running. Upon completion of
these studies, system implementation would then need to proceed and be operational in the 2013 timeframe.
THIS PROJECT IS RELATED TO THE FOLLOWING: Meet Environmental Compliance requirements.
EXPLANATION OF IMPACT ON OPERATING BUDGET: Would expect this project to be funded outside the normal O&M budget. An
anticipated result of this project will be lower environmental costs and regulatory requirements in the future. Currently, the plant has
been discharging to Kent County Sewer System with no charge. This will no longer be the case regardless if this project is approved.
TIME-LINE/CURRENT STATUS: This project will be initiated in fiscal 2012 and be completed in fiscal 2013
COMMENTS:
FIVE-YEAR COST BREAKDOWN SCHEDULE:
Prior to 2012 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 After 2016 TOTAL
Planning and Design 30,000 15,000 45,000
Construction 124,000 124,000
Miscellaneous Equipment 30,000 73,000 103,000
Other
TOTAL 60,000 212,000 272,000
FINANCING:
Prior to 2012 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 After 2016 TOTAL
TOTAL
IMPACT ON OPERATING BUDGET:
Description Prior to 2012 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 After 2016 TOTAL
2012-2016 Capital Investments Plan
Page 5
Tie-In of the McKee Run Industrial Wastewater Flow to
the Kent County Sewer System and Elimination of the
NPDES Industrial Discharge Points
May 31, 2012
Page 6
Project Summary
NAES Corporation is currently in the process of
finalizing a project to provide metering for all
wastewater discharges from the site per City of Dover
and Kent County code. Additionally, to address and
mitigate several potential National Pollutant
Discharge Elimination System (NPDES) permit
compliance issues with the current cooling water
discharges, the cooling water will be re-routed to the
Kent County WWTP via the existing City of Dover
sanitary sewer collection system.
2
Page 7
Project Background
As the result of a 2011 internal site assessment, it was identified that due to
operational changes since the last assessment, the McKee Run Generating
Station (MRGS) site is now required to meter wastewater flows as required
under City of Dover code, as well as put in place an Industrial Wastewater
Discharge Permit (IWDP) per Kent County code.
Several Delaware River Basin Commission (DRBC) docket and NPDES permit
parameters are of concern, and difficulties may or have arisen in meeting them
consistently during certain times of the year or under particular operating
conditions.
Preliminary analysis shows compliance with DRBC docket parameters in
particular may be impossible without significant capital investment, or
possibly not at all under current anticipated operating scenarios.
Non-compliance with either the DRBC docket, or NPDES permit, could lead to
Notice of Violations (NOV’s) and/or mandatory cessation of discharge which
would lead to the facility being unable to operate, and likely lead to a
compliance timetable where significant capital expenditures were mandated to
continue operation of the facility.
3
Page 8
Project Scope
Reconfiguration of existing Sanitary and Industrial Wastewater
discharges to be fully segregated and metered per City of Dover (COD)
and Kent County code
Re-routing of Industrial flow to utilize unused Fire Water Tank to
buffer discharge
Addition of flow metering and control system to ensure all discharges
are properly managed and metered to the COD collection system
Reconfiguration of existing combustion unit cooling water blowdowns
to eliminate NPDES discharges and conserve water (3 to 10 fold lower
water usage)
Elimination of current NPDES discharge permit and DRBC docket, and
conversion to general stormwater permit thereby eliminating risk of
non-compliance
Negotiation of new Kent County Industrial Wastewater Discharge
Permit (IWDP) for the facility as required by code
4
Page 9
Project Benefits
The project will provide several key benefits to the
facility which are as follows:
Proper wastewater billing through the City of Dover
Allow for reduced water consumption due to higher
strength wastewater discharge
Alleviate regulatory compliance concerns over
Temperature, Total Dissolved Solids, and Enterococci
parameters
Provides continued operational flexibility required for
the safe and efficient operation of the facility
5
Page 10
Project Justification
Sewer discharge metering is currently required by the City of Dover for all
discharges and there is currently no means to accomplish this with the existing
system configuration.
Kent County IWDP code also requires that all wastewater discharges be
metered.
A large portion of the piping and control changes would be required regardless
of whether the outfalls were eliminated or not, so to maximize efficiency and
minimize potential risk, the project encompasses the outfall diversion.
Additional benefit to eliminating NPDES Industrial discharges from a
compliance, conservation, and budgetary standpoint (projected increase of 3-
10 fold increase over historic water usage rate based on 2011 testing)
Based on past DRBC actions, there is no guarantee that in the future, outfall
parameters won’t be made further restrictive, thereby causing
compliance/operational issues and/or further capital expenditures if this is not
addressed now.
Diverting the wastewater discharge from the outfalls to the sanitary sewer will
lessen the overall regulatory burden and risk to the facility and allow for the
necessary operational flexibility required now and in the future.
6
Page 11
Specific Compliance Risks
Applies to Outfall 004 and Outfall 005
Total Dissolved Solids (TDS) Limit of 1,000 mg/l (DRBC)
Outfall Max Discharge Temperature of 90oF (NPDES)
Outfall Max Discharge Temperature of 87oF (DRBC)
Receiving Water Body Max Temperature Increase of 5oF (DRBC)
A Thermal Study is mandated for completion by September 15, 2012, and a
“constructive compliance schedule for the preferred compliance alternative” in
Spring 2013 when the docket comes up for renewal. (DRBC)
For Outfall 005, current NPDES discharge limit of 1.1 x 109 total cell count
Enterococci in effect as of 9/1/2011 (NPDES)
There is a current risk of exceeding TDS and/or Temperature parameters in
normal daily operations
The DRBC will require the IWDP be in place for the facility prior to waiving the
Thermal Study completion requirement of September 15, 2012. The IWDP will
in turn have a construction schedule attached for project completion, likely 3-6
months. Therefore, the project will likely be required to be in place no later
than December or April (depending on Kent County) of 2013.
7
Page 13
Next Steps
Finalize Engineering for project
Obtain current costs for both materials and labor
Obtain City of Dover approval for new project
Pre-Order materials & equipment ASAP
Schedule installation of system around projected run times
and outage schedule(s)
Finalize Regulatory Process
Finalize Kent County IWDP (almost complete – working on
final revisions)
Work with DNREC to convert NPDES to General Stormwater
Permit
Negotiate DRBC docket modification and closure based on
wastewater re-routing to Kent County
9
Page 14
City of Dover
MAYOR AND COUNCIL
DRAFT PROPOSED COUNCIL RESOLUTION NO. 2012-11
A RESOLUTION ADOPTING THE AMERICAN PUBLIC POWER ASSOCIATION
(APPA) SAFETY MANUAL FOR THE CITY OF DOVER ELECTRIC UTILITY
WHEREAS, the City of Dover owns a municipal electric utility employing a number of
dedicated employees in the electric trade; and
WHEREAS, it is the City’s goal to employ safe practices that will ensure the highest level
of protection possible to all electrical utility employees; and
WHEREAS, provisions of the American Public Power Association (APPA) Safety Manual
are currently being utilized as policy within the City’s Electric Utility Department; and
WHEREAS, official adoption of the APPA Manual will allow the City to meet the
requirements of the Reliable Public Power Provider (RP3) Program.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF
THE CITY OF DOVER, IN COUNCIL MET:
That the American Public Power Association (APPA) Safety Manual is adopted as the
governing set of safety rules for its municipal electric utility employees.
ADOPTED: *
S:\RESOLUTIONS & PROCLAMATIONS\2012\Draft\2012-11 - Adoption of American Public Power Association (APPA) Safety Manual.wpd
CARLETON E. CAREY, SR. THOMAS J. LEARY
MAYOR COUNCIL PRESIDENT
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 15
Annual Engineering Consultant’s Report
on the
Operation and Maintenance
of the Electric System
Fiscal Year 2011
Electric Division
City of Dover, Delaware
Project No. 66212
April 2012
Page 16
Annual Engineering Consultant’s Report
on the Operation and Maintenance
of the Electric System
Fiscal Year 2011
Prepared for the
Electric Division
City of Dover, Delaware
April 2012
Project No. 66212
Prepared by
Burns & McDonnell Engineering Company, Inc.
Kansas City, Missouri
COPYRIGHT © 2012 BURNS & McDONNELL ENGINEERING COMPANY, INC.
Page 17
April 18, 2012
Ms. Donna S. Mitchell, CPA
Controller/Treasurer
City of Dover
5 East Reed Street
Weyandt Hall, Suite 300
Dover, Delaware 19901
City of Dover
Annual Engineering Consultant’s Report
Project No. 66212
Dear Ms. Mitchell:
In compliance with the requirements of Section 705 and Section 504 of the City of Dover,
Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December
23, 1985 (Resolution), Burns & McDonnell submits this Annual Engineering Consultant’s
Report for the fiscal year ended June 30, 2011. This report summarizes our review and
assessment of the City of Dover’s (City) Electric System, its existing retail electric rates, its
insurance coverage in effect, and its reserve funds. Financial, statistical, and operating data
used in preparing the report were initially reported in the City’s annual financial statements and
accounting records, as well as additional information furnished by City and Electric Division
staff.
In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed
assessments of the electric generating stations and the transmission and distribution system of
the City’s Electric Division. Assessments involved interviews, observations, and review of
fiscal year 2011 expenditures and fiscal year 2012 budgets. In addition, an analysis of the
balances of the Improvement and Extension Fund, as well as other funds benefiting the Electric
Division was performed. Burns & McDonnell also reviewed the adequacy of the revenues
provided by the current retail rates in relation to the requirements of the Resolution. Finally, a
high-level assessment of the City’s insurance coverage related to the Electric Division was
completed.
Based on these reviews and assessments, it is the opinion of Burns & McDonnell that the
Electric System is being operated and maintained, including replacements and upgrades as
appropriate, in a manner that is consistent with current electric utility practices. In addition,
the current retail rates have provided sufficient revenues to satisfy the debt service coverage
requirement in the Resolution.
Further, it is the opinion of Burns & McDonnell that the balances in the various reserve funds
maintained by the City for the Electric Division are sufficient for their intended purposes.
9400 Ward Parkway • Kansas City, MO 64114-3319
Tel: 816 333-9400 • Fax: 816 333-3690 • www.burnsmcd.com
Page 18
Ms. Donna Mitchell, City of Dover
April 18, 2012
Page 2
We appreciate the cooperation and assistance provided by the City and the Electric Division
staff in the preparation of this report. We will be happy to discuss the report with you at your
convenience.
Sincerely,
BURNS & McDONNELL
Ted J. Kelly
Principal & Senior Project Manager
Business & Technology Services
TJK
Page 19
2011 Engineering Consultant’s Report Table of Contents
TABLE OF CONTENTS
Page No.
EXECUTIVE SUMMARY
Introduction ........................................................................................................................ ES-1
Electric System Overview and Assessment ....................................................................... ES-1
Financial Assessment ......................................................................................................... ES-4
Conclusions ........................................................................................................................ ES-6
PART I - INTRODUCTION
Purpose of Report .............................................................................................................. I-1
Organization....................................................................................................................... I-2
PART II – ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
Electric System Overview.................................................................................................. II-1
Production Plant ........................................................................................................... II-3
Transmission and Distribution Plant ............................................................................ II-3
General Plant ................................................................................................................ II-4
Electric System Assessment............................................................................................... II-4
Electric Generating Stations ......................................................................................... II-4
Description .............................................................................................................. II-4
Management and Organization................................................................................ II-5
Major Equipment Operation and Maintenance ....................................................... II-6
Electric Generation Improvements .......................................................................... II-7
Condition Assessment ............................................................................................. II-8
Transmission and Distribution Systems ....................................................................... II-12
Safety ....................................................................................................................... II-13
System Reliability ................................................................................................... II-13
Power Quality .......................................................................................................... II-13
Operations and Maintenance ................................................................................... II-13
Design Standards and Specifications....................................................................... II-14
Transmission and Distribution Capital Improvements ............................................ II-15
Condition Assessment ............................................................................................. II-15
Conclusions .................................................................................................................. II-16
PART III – FINANCIAL ASSESSMENT
Financial Results ................................................................................................................ III-1
Required Revenue Level............................................................................................... III-1
Electric Rates ................................................................................................................ III-2
Operating Results.......................................................................................................... III-2
Adequacy of Electric Rates .......................................................................................... III-7
Status of Revenue Bonds ................................................................................................... III-8
Insurance ............................................................................................................................ III-9
Operating and Reserve Accounts ....................................................................................... III-9
Electric Revenue Fund .................................................................................................. III-9
Electric Improvement and Extension Fund .................................................................. III-11
PART IV – CONCLUSIONS
City of Dover, Delaware TOC-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 20
2011 Engineering Consultant’s Report Table of Contents
LIST OF TABLES
Table No. Page No.
II-1 Year-End Plant in Service ............................................................................................ II-1
II-2 Fiscal Year 2012 Planned Capital Expenditures........................................................... II-2
II-3 Fiscal Year 2011 Operating Statistics ........................................................................... II-7
III-1 Annual Sales and Customers ........................................................................................ III-3
III-2 Annual Revenues and Sales Ratios............................................................................... III-4
III-3 Net Revenue Margins and Unaccounted For Energy ................................................... III-5
III-4 Comparative Statement of Revenues, Expenses, and Changes in Unreserved
Retained Earnings ......................................................................................................... III-6
III-5 Debt Service Coverage Calculation .............................................................................. III-7
III-6 Debt Service Schedule of Electric Revenue Bonds ...................................................... III-8
III-7 Schedule of Insurance Coverage in Effect .................................................................... III-12
III-8 Schedule of Insurance Coverage in Effect .................................................................... III-13
III-9 Reserve Account Activity and Balances ....................................................................... III-14
LIST OF FIGURES
Figure No. Page No.
I-1 Organization ................................................................................................................. I-3
I-2 Administration .............................................................................................................. I-3
I-3 Electric Engineering ..................................................................................................... I-3
I-4 Electric Transmission & Distribution ........................................................................... I-4
*****
City of Dover, Delaware TOC-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 22
2011 Engineering Consultant’s Report Executive Summary
EXECUTIVE SUMMARY
INTRODUCTION
The 2011 Annual Engineering Consultant’s Report (Report) has been prepared in compliance with the
requirements of the City of Dover, Delaware Resolution Authorizing and Securing Electric Revenue
Bonds, adopted December 23, 1985 (Resolution). Burns & McDonnell has been retained as Engineering
Consultant by the City of Dover, Delaware (City) for this purpose.
The Resolution requires that the Engineering Consultant complete the following:
“The City covenants that it will cause the Engineering Consultants employed under the
provisions of Section 705 of this Resolution . . . to make an inspection of the Electric System at
least once each fiscal year and . . . to submit to the City Manager a report setting forth (a) their
findings whether the properties of the Electric System have been maintained in good repair,
working order and condition and whether they have been operated efficiently and economically
and (b) their recommendation as to
(i) the proper maintenance, repair and condition of the Electric System during the ensuing fiscal
year and an estimate of the appropriations which should be made for such purposes,
(ii) the insurance to be carried under the provisions of Article VII of this Resolution,
(iii) the amount that should be deposited during the ensuing fiscal year to the credit of the
Improvement and Extension Fund for the purposes set forth in Section 510 of this Article,
(iv) the extensions, improvements, renewals and replacements which should be made during the
ensuing fiscal year, and
(v) any necessary or advisable revisions of the electric rates.”
This is the ninth annual Engineering Consultant’s Report prepared for the City by Burns & McDonnell.
ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
The Electric System owned by the City primarily consists of production plant, transmission plant,
distribution plant, and general plant facilities.
City of Dover, Delaware ES-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 23
2011 Engineering Consultant’s Report Executive Summary
The City owns two power plants, the McKee Run Generating Station (McKee Run) and the VanSant
Generating Station (VanSant). McKee Run consists of three steam turbine generating units with a total
combined capacity of 136 megawatts (MW). VanSant is a 39 MW simple-cycle combustion turbine unit.
Effective May 4, 2006, the City entered into a five-year Energy Management Agreement with PACE
Global Asset Management (PACE), LLC of Fairfax, Virginia to assist the City with its energy
procurement, energy sale, purchase of fuels, establishment and management of risk policies, the
development and management of hedging protocols and related energy procurement challenges. The
PACE contract expired June 30, 2011 and effective July 1, 2011, The Energy Authority, Inc. (TEA)
began assisting the City with its energy management activities. Headquartered in Jacksonville, Florida,
TEA is a non-profit energy manager owned by seven public utility systems operating across the nation.
North American Energy Services Corporation (NAES Corporation) operates the generating plants. The
agreement between the City and NAES Corporation has been in effect since July 1, 2006. The
Engineering Consultant’s observations regarding the generating stations and units are described in the
Electric System Overview and Assessment section of the Report.
The Electric Division served approximately 22,915 customers at the end of FY 2011, over 19,730 of
which were residential customers. The distribution facilities include 219 miles of overhead lines and 219
miles of underground lines connected through fifteen substations. The Engineering Consultant’s
observations regarding the transmission and distribution systems are described in the Electric System
Overview and Assessment section of the Report.
Four of the Electric Division customers take service off of the 69 kV transmission system. These
customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG Energy Center (NRG).
NRG is an exempt wholesale generator that sells power that must be transmitted through the City’s
transmission system to third party purchasers. When the NRG plant is not operational, the Electric
Division provides power for the plant site.
The Electric Division has one contract for providing transmission service through the Electric System. As
previously stated, the Electric Division provides transmission service to NRG for the output of its 16-MW
electric generator.
City of Dover, Delaware ES-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 24
2011 Engineering Consultant’s Report Executive Summary
General plant facilities consist primarily of Electric Division administrative and operations facilities and
pollution control related equipment on McKee Run and VanSant. Other types of general plant include
office furniture and equipment, transportation and power-operated equipment, and communication
equipment.
The various systems and components of the generating stations reviewed by the Engineering Consultant
are listed below:
Major Equipment Condition and Improvements Management and Organization
Steam turbines/generators Safety
Boilers and auxiliaries Training
Station cooling water systems
Fuel handling systems
Water treatment systems
Station electrical systems
Station control systems
General facilities
Based on statements and information provided, as well as the observations and reviews performed, it is
the Engineering Consultant’s opinion that the City’s power generation facilities are being operated and
maintained consistent with accepted electric utility practice in the United States. In general, the
performance, operation, maintenance, staff, planning, and training aspects for the McKee Run and
VanSant were found to be above average. Specifically, the generation facilities have demonstrated a high
level of availability despite the dispatching of the units primarily for peak demand.
The Engineering Consultant’s observations regarding the generating stations and units are described in
the Electric System Overview and Assessment section of the Report. The following list includes areas of
the transmission and distribution system that were considered and reviewed.
System reliability
Power quality
Operations and maintenance
Design standards and specifications
Transmission and distribution improvements
City of Dover, Delaware ES-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 25
2011 Engineering Consultant’s Report Executive Summary
It is the Engineering Consultant’s opinion that the design, construction, operation, and maintenance of the
City’s electric transmission and distribution system and the associated facilities are consistent with
current generally accepted electric utility standards. In recent years, the City has done a good job of
making appropriate upgrades and improvements which the Engineering Consultant has observed while
conducting the reviews and assessments to complete the annual reports.
The Engineering Consultant’s observations regarding the transmission and distribution systems are
described in the Electric System Overview and Assessment section of the Report.
FINANCIAL ASSESSMENT
The level of revenues required from the retail electric rates for the Electric Division were determined
through the analysis of the financial results and net income or net margins for FY 2011. The Resolution
requires that the Electric Division maintain a debt service coverage ratio of 1.25. Following is an excerpt
from Section 502(c) of the Resolution.
“(c) The total amount of the Revenues of the Electric System during the preceding fiscal year
shall have been not less than the total of the following:
(1) The Current Expenses of the Electric System during the current fiscal years shown by the
Annual Budget . . . for such fiscal year, and
(2) One hundred twenty-five percent (125%) of the maximum amount of the Principal and
Interest Requirements for any fiscal year thereafter on account of all bonds then Outstanding
under the provisions of this Resolution.”
Customers of the Electric Division of the City were charged for the electric service they received based
on the City’s rate schedules and contracts that were in place in FY 2011. A comprehensive cost-of-service
and rate design study was completed in 2006 and subsequent rate analyses were completed in 2007 and
2008 to examine revenue requirements and revenue generation. Specifically, the 2006 rate study was
conducted to address increased costs associated with a new power supply contract that became effective
on July 1, 2006. The rate study recommended combining a number of rate classes and implementing rate
increases on July 1, 2006. The 2006 rate study also recommended an additional increase be implemented
on January 1, 2007 to cover increased costs associated with operating the generating station. The 2007
and 2008 rate analyses re-examined Electric Division revenues and expenses and recognized additional
revisions to power supply costs. As a result of these analyses, additional rate increases were implemented
City of Dover, Delaware ES-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 26
2011 Engineering Consultant’s Report Executive Summary
on July 1, 2007 and July 1, 2008. The July 2008 rate adjustments established the rate schedules utilized
by the Electric Division today.
Total energy sales increased from 708.5 GWh in FY 2010 to 734.1 GWh in FY 2011, an increase of 3.6
percent. Total revenue from sales to electric customers in FY 2011 was approximately $99.5 million,
representing an increase of $1.4 million from FY 2010 rate revenue of approximately $98.1 million. In
FY 2011, the average revenue per kWh for residential customers was 14.79 cents and the system-wide
average price was 13.56 cents per kWh.
The Electric Division’s largest cost in providing electric service to its customers is the wholesale cost of
power purchased from the Pennsylvania New Jersey Maryland Interconnection (PJM) marketplace by its
FY 2011 Energy Manager, PACE. From FY 2010 to FY 2011, the cost of power decreased from $72.8
million to $69.6 million. Net income decreased from $3.3 million in FY 2010 to $3.2 million in FY 2011.
The net income decrease in FY 2011 was due in large part to operating transfers out, which reached a ten-
year high of $8.9 million.
The Resolution requires that annual revenues of the Electric Division be no less than the total current
expenses plus 125 percent of the greatest remaining annual debt service. The Electric Division achieved
debt service coverage ratios for FY 2009, FY 2010, and FY 2011 of 2.88, 4.24, and 5.45 respectively;
therefore, the revenues generated by the current electric rates have been sufficient to meet the applicable
covenant of the Resolution.
The City maintains a comprehensive insurance program to insure against varying types of liabilities, as
well as significant losses related to various Electric Division properties. It is the opinion of Burns &
McDonnell as Engineering Consultant, and not as insurance counselor, the insurance in full force and
affect appears to satisfy the requirements of Section 706 of the Resolution.
The City established the Electric Revenue Fund and the Electric Improvement & Extension (I&E) Fund to
ensure that moneys are available for specific purposes when they are needed. The following is a list of
these funds’ respective cash accounts:
Electric Revenue Fund
Insurance Reserve Account
Contingency Reserve Account
Electric Rate Stabilization Reserve Account
City of Dover, Delaware ES-5 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 27
2011 Engineering Consultant’s Report Executive Summary
Interest and Sinking Account
Electric Improvement and Extension Fund
Depreciation Reserve Account
Future Capacity Reserve Account
The Engineering Consultant reviewed information on the accounts listed above and found that the
balances in those accounts as of June 30, 2011, were consistent with the required or target balances.
CONCLUSIONS
Based on the reviews and assessments completed, it is the opinion of Burns & McDonnell that:
1. The City’s power generation facilities are being operated and maintained consistent with accepted
electric utility practice in the United States.
2. The design, construction, operation, and maintenance of the City’s electric transmission and
distribution system and the associated facilities are consistent with current generally accepted electric
utility standards and over the past few years, the system has been upgraded in order to improve
operation and service to customers.
3. The Electric Division capital projects included in the City’s Capital Investment Plan and the FY 2012
Operating Budget are necessary and should provide improved reliability and power quality for the
Electric System.
4. The balances as of June 30, 2011, for the various reserve funds maintained by the City for the Electric
Division, appear to be sufficient for their defined purposes.
5. The insurance coverage in full force and effect as maintained by the City related to the various assets
of the Electric Division appears to satisfy the requirements of Section 706 of the Resolution.
6. The electric revenues generated by the City’s current retail rates are more than sufficient to fulfill the
debt service coverage requirement (125 percent of current expenses) defined in Section 502(c) of the
Resolution.
*****
City of Dover, Delaware ES-6 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 28
PART I - INTRODUCTION
Page 29
2011 Engineering Consultant’s Report Part I – Introduction
PART I
INTRODUCTION
The City of Dover, Delaware (City) operates a municipally-owned electric utility system that serves
approximately 22,915 customers within the City and surrounding areas. The service area of the electric
utility is located in central Delaware; with the City itself located approximately 70 miles south of
Philadelphia, Pennsylvania.
PURPOSE OF REPORT
This 2011 Annual Engineering Consultant’s Report (Report) has been prepared in compliance with the
requirements of the City of Dover Electric Bond Resolution (Resolution) adopted December 23, 1985.
Burns & McDonnell has been retained by the City as the Engineering Consultant defined in Section 705
of the Resolution, as follows.
“The City covenants that it will, for the purpose of performing and carrying out the duties
imposed on the Engineering Consultants under the provisions of this Resolution, employ an
independent engineer or engineering firm or corporation having a nationwide and favorable
repute for skill and experience in such work.”
The required scope of the Report is described in Section 504 of the Resolution, as follows.
“The City covenants that it will cause the Engineering Consultants employed under the
provisions of Section 705 of this Resolution . . . to make an inspection of the Electric System at
least once each fiscal year and . . . to submit to the City Manager a report setting forth (a) their
findings whether the properties of the Electric System have been maintained in good repair,
working order and condition and whether they have been operated efficiently and economically
and (b) their recommendation as to
(i) the proper maintenance, repair and condition of the Electric System during the ensuing fiscal
year and a estimate of the appropriations which should be made for such purposes,
(ii) the insurance to be carried under the provisions of Article VII of this Resolution,
(iii) the amount that should be deposited during the ensuing fiscal year to the credit of the
Improvement and Extension Fund for the purposes set forth in Section 510 of this Article,
City of Dover, Delaware I-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 30
2011 Engineering Consultant’s Report Part I – Introduction
(iv) the extensions, improvements, renewals and replacements which should be made during the
ensuing fiscal year, and
(v) any necessary or advisable revisions of the electric rates.”
ORGANIZATION
The Public Utilities Director is responsible for the overall management of the Public Utilities Department.
The Public Utilities Director oversees the day-to-day operations of the Electric, Water, and Wastewater
Divisions and manages the Division’s staff. The Director also provides oversight of the Power Plant
budget and monitors the contracts the energy coordinator and the power generation operator/manager.
The Electric Division is organized into three separate operating sections. Descriptions of the current
Electric Division sections are provided below.
Administration Section – Administration provides the overall management of the Electric Division’s
Engineering and Transmission & Distribution Sections. This section performs all planning and budgeting,
monitors all construction projects, administers all power supply and generating station operations
agreements, and coordinates with customer service and public relations for the Electric Division.
Electric Engineering Section – Electric Engineering provides design, specifications, construction
management, and project inspection for all capital investment projects of the Electric Division. This
section also develops and maintains maps, plans, and specifications, as well as engineering standards for
construction and maintenance of the Electric System. Lastly, it is responsible for the operation of a 24/7
system operations control center, referred to as System Operations.
Transmission & Distribution Section – Transmission & Distribution constructs, operates, and maintains
the overhead and underground Electric Systems and fiber optic communication facilities. This section
installs and maintains all electric metering, as well as street and security lighting. This section also
investigates and resolves customers’ power problems and oversees the work of tree trimming contractors.
Figures I-1 through I-4 provide organizational charts illustrating the staffing hierarchies of the various
sections in the Electric Division. The number of individuals in each position was indicated as appropriate.
Electric Division staff totaled 47 at the time the FY 2012 budget was issued.
City of Dover, Delaware I-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 31
2011 Engineering Consultant’s Report Part I – Introduction
Figure I-1: Organization
City Manager
Public Utilities Director
Electric Transmission
Administration (4) Electric Engineering (15)
& Distribution (28)
Figure I-2: Administration
Dept. Budget and Staff Supervisor (1)
Administrative Assistant (1) Account Clerk II (2)
Figure I-3: Electric Engineering
Engineering Services Manager
Engineering Crew Leader (1) Substation Crew Leader (1) Systems Operations Crew Leader (1)
Engineering Fieldworker (2) Relayman (2) Electric System Operators (4)
Electrical Engineer (1) Draftsman (1)
Substation Foreman (1)
City of Dover, Delaware I-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 32
2011 Engineering Consultant’s Report Part I – Introduction
Figure I-4: Electric Transmission & Distribution
T & D Supervisor
Senior Lineman (3) Electric Meter Tech Crew Leader (1)
Journeyman Lineman (9) Electric Meter Tech II (2)
Lineman 2nd Class (5)
Lineman 3rd Class (3)
Ground Worker (3)
Stores Coordinator I (1)
The subsequent sections of the Report provide a discussion of the required reviews and inspections
conducted pursuant to Section 504 of the Resolution. Part II describes the assessment of the Electric
System and its condition. Part III presents the financial results for the Electric Division, including an
analysis of the adequacy of revenues provided by the electric rates. Part IV summarizes the conclusions of
Burns & McDonnell regarding the operation and maintenance of the Dover Electric System.
In the preparation of the Report, Burns & McDonnell reviewed and analyzed maintenance records,
audited financial statements, and other data provided by the City. Burns & McDonnell has relied on the
information provided without independent verification, and cannot guarantee its accuracy or
completeness. In addition, Burns & McDonnell has used the information provided to make certain
assumptions with respect to conditions that may exist in the future. While Burns & McDonnell believes
the assumptions made are reasonable for the purposes of the Report, it makes no representation that the
conditions assumed will occur.
*****
City of Dover, Delaware I-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 33
PART II – ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
Page 34
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
PART II
ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
ELECTRIC SYSTEM OVERVIEW
The Electric System owned by the City of Dover, Delaware (City), primarily consists of production plant,
transmission plant, distribution plant, and general plant facilities, and construction work in progress.
Table II-1 displays the year-end balances of the various plant components for FY 2009 through FY 2011.
Table II-2 itemizes the specific capital investment plan projects and anticipated expenditures for FY 2011,
as well as projections for other components included in the FY 2012 budget.
Table II-1
YEAR-END PLANT IN SERVICE
City of Dover Electric Division
FY 2009 FY 2010 FY 2011
Capital assets, not being depreciated
Land $ 1,458,066 $ 1,458,066 $ 1,458,066
Construction in progress 17,272,520 12,772,089 424,809
Total capital assets, non-depreciable $ 18,730,586 $ 14,230,155 $ 1,882,875
Capital assets, being depreciated
Buildings $ 16,676,093 $ 16,922,580 $ 17,383,566
Production 60,028,422 62,442,716 63,408,937
Transmission 20,821,161 22,651,256 32,558,944
Distribution 49,431,989 55,811,945 59,824,248
Administration 1,519,649 1,530,413 1,551,280
Vehicles 674,610 624,428 622,236
Total capital assets, being depreciated $ 149,151,924 $ 159,983,338 $ 175,349,211
Less accumulated depreciation for:
Buildings $ (10,180,242) $ (10,574,839) $ (10,992,065)
Production (37,316,699) (38,692,760) (39,931,442)
Transmission (7,369,638) (8,052,226) (9,206,982)
Distribution (20,962,765) (22,260,895) (23,817,302)
Administration (937,556) (1,029,427) (1,102,778)
Vehicles (405,418) (427,752) (435,188)
Total accumulated depreciation $ (77,172,318) $ (81,037,899) $ (85,485,757)
Total capital assets, being depreciated, net 71,979,606 78,945,439 89,863,454
Total capital assets, net $ 90,710,192 $ 93,175,594 $ 91,746,329
In FY 2011, the Electric System experienced an increase in the annual system peak demand and a
decrease in annual energy sales from the previous year. The Electric System experienced its peak at 3
City of Dover, Delaware II-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 35
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
p.m. on June 9, 2011 when demand reached 164.6 MW. For the year, approximately 734.1 GWh of
energy were sold, a decrease of 3.6 percent from the preceding year. The Electric Division projects
energy sales to decrease in FY 2012 to 710.0 GWh, a decrease of 3.3 percent. From FY 2012, the Electric
Division expects annual energy sales to remain relatively constant through FY 2016.
Table II-2
FISCAL YEAR 2012 PLANNED CAPITAL EXPENDITURES
City of Dover Electric Division
Electric Engineering Projects:
Distribution System Upgrades $ 500,000
Lighting Project and Rehabilitation 50,000
Substation Equipment & Fencing (Division St) 40,000
SCADA Master Hardware Replacement 75,000
Transmission Line Maintenance Program 75,000
Distribution Feeder Replacement Program 377,510
Distribution Capacitors - Overhead 50,000
Distribution Capacitors - Underground 50,000
Frazier Substation Reliability Upgrade 155,000
Substation PT & CT Replacement Program 267,715
Vehicles, Trucks, & Equipment 150,491
Subtotal Electric Engineering Division $ 1,790,716
Electric Transmission & Distribution Projects:
New Developments - UG Transformers $ 600,000
Vehicles, Trucks, & Equipment 48,337
Subtotal Electric Transmission Division $ 648,337
Electric Generation Projects:
McKee Run Switchyard Blast walls $ 50,000
McKee Run Preservation of Structures 38,000
McKee Run Demineralizer Replacement 65,000
Unit 3 - Stack Repairs 25,000
Unit 3 Boiler Air Heater 440,000
Unit 3 Boiler Systems 130,000
Unit 3 - Gas Modification 36,206
Unit 3 FD & ID Fan Controller Upgrade 92,000
Unit 3 DCS Computers & Software Upgrades 85,000
Unit 3 Auxiliary System Components 113,000
Unit 3 Turbine Outage/Inspections 348,000
Unit 3 Cooling Water Line Replacement 25,000
Unit 3 Air Heater Expansion Joint 82,807
Units 1 & 2 Life Extension 196,331
Units 1 & 2 Cooling Tower Life Extension 25,410
Units 1 & 2 Control Modifications 25,700
VanSant component replacements 50,000
McKee Run Equipment replacements 70,000
Subtotal Electric Generation Division $ 1,897,454
Electric Metering Division
Vehicles, Trucks, & Equipment $ 20,000
Total Planned Capital Investment Projects $ 4,356,507
City of Dover, Delaware II-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 36
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
Production Plant
The City owns two power stations, the McKee Run Generating Station (McKee Run) and the VanSant
Generating Station (VanSant). McKee Run consists of three steam turbine generating units with a total
combined capacity of 136 megawatts (MW). VanSant is a 39-MW simple-cycle combustion turbine unit.
Effective May 4, 2006, the City entered into a five-year Energy Management Agreement with PACE
Global Asset Management (PACE), LLC of Fairfax, Virginia to assist the City with its energy
procurement, energy sale, purchase of fuels, establishment and management of risk policies, the
development and management of hedging protocols and related energy procurement challenges. The
PACE contract expired June 30, 2011 and effective July 1, 2011, The Energy Authority, Inc. (TEA)
began assisting the City with its energy management activities. Headquartered in Jacksonville, Florida,
TEA is a non-profit energy manager owned by seven public utility systems operating across the nation. At
the time of the Report, TEA was currently completing a useful life study focusing on Units 1 and 2 at
McKee Run. The purpose of the study is for financial due diligence and proper accounting. A similar
study was completed several years ago by the City’s former energy manager, PACE.
North American Energy Services Corporation (NAES Corporation) operates the generating plants. The
agreement between the City and NAES Corporation has been in effect since July 1, 2006. The
Engineering Consultant’s observations regarding the generating stations and units are described later in
this section of the Report.
Transmission and Distribution Plant
The service area includes 44 miles of overhead transmission lines, 0.12 miles of underground
transmission lines, 175 miles of overhead distribution lines and 219 miles of underground distribution
lines. Four Electric Division customers take service off of the 69-kV transmission system. These
customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG Energy Center (NRG).
NRG is an exempt wholesale generator that sells power that must be transmitted through the City’s
transmission system to third party purchasers. When the NRG plant is not operating the Electric Division
provides power for the plant site.
The Electric Division has two contracts for providing transmission service through the Electric System.
As previously stated, the Electric Division provides transmission service to NRG for the output of its 16
MW electric generator. The Electric Division also has a point-to-point contract for the output of an NRG
City of Dover, Delaware II-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 37
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
Combustion Turbine which ties directly to the Kent Substation and is not part of the Dover transmission
system.
General Plant
The general plant category consists primarily of Electric Division administrative and operations facilities,
and pollution control related equipment at McKee Run and VanSant. The agreement with NAES
Corporation stipulates NAES Corporation manage the operation and maintenance of the facilities and the
City funds all replacements and upgrades required to maintain the capability of the two generating
stations. The City is also responsible for the costs of compliance with new regulations promulgated. Other
types of items included in the general plant category include office furniture and equipment, computer-
related equipment, transportation and power-operated equipment, and communication equipment. Burns
& McDonnell did not specifically assess the items in the general plant category for the Report.
ELECTRIC SYSTEM ASSESSMENT
Burns & McDonnell, the Engineering Consultant to the City, made observations and conducted
assessments of the Electric System assets in support of the development of this annual Engineering
Consultant’s Report. The findings of Burns & McDonnell from the review of the City’s Electric System
are documented herein.
Electric Generating Stations
On February 22, 2012, Mr. Ted Kelly of Burns & McDonnell met with representatives of NAES
Corporation to discuss the condition of the McKee Run and VanSant generating stations. Mr. Kenneth
Beard, the Plant O&M Manager, coordinated the visit along with Mr. Phillip Kosek, the Plant
Administration and Environmental Health & Safety Manager.
Description: McKee Run consists of three units. Units 1 and 2 were originally coal-fired units, which
began operations in 1961 and 1962, respectively. In 1972, these units were converted to burn No. 6 fuel
oil. Units 1 and 2 each have rated capacities of 17 MW. Unit 3 began operations in 1975 and was
designed to fire No. 6 fuel oil and natural gas. Unit 3 has a rated capacity of 102 MW. In FY 2008, the
City began work to convert all three units at McKee Run to burn No. 2 fuel oil in order to reduce
pollution from the plant. To date, the necessary upgrades and new equipment had been installed allowing
each of the units to burn both natural gas and No. 2 fuel oil.
City of Dover, Delaware II-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 38
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
VanSant consists of a simple cycle combustion turbine with a rated capacity of 39 MW. This unit
commenced operation in 1991. VanSant remains unmanned, except when it is dispatched into service. On
the occasions when the unit is dispatched, personnel from McKee Run are transferred to VanSant to
startup and operate the unit.
Management and Organization: Station management is very well organized and knowledgeable,
and takes a logical approach to the operation and maintenance of the generation facilities. Mr. Vince Scire
serves as the Plant Manager. The management/leadership team consists of eight members including Mr.
Scire. The Administrative & Employee Health and Safety Manager, Material Management Coordinator,
and O&M Manager, all report directly to Mr. Scire. An Administrative Specialist position is currently
open at the plant. This position is part of the management/leadership team as well.
The O&M Manager oversees a Maintenance Supervisor, a Compliance Specialist and four Operations
teams. Each operations team consists of two supervisors and three operators working 12-hour rotating
shifts. Two operators work eight-hour flex time shifts Monday through Friday, and fill in as needed. The
maintenance team consists of a planner, a supervisor and five employees working eight-hour shifts. The
operations and maintenance personnel are all union employees. The relationship between the union and
management was reported to be excellent. McKee Run is currently at a staff level of 28 employees, with
32 approved positions.
Safety: “Safety First” is an overall theme and attitude of the Electric Division. Near-miss incidents are
documented, reviewed, and corrective follow-up actions are taken as required. An employee-run safety
committee is actively in place. This committee conducts monthly safety meetings, completes safety
equipment inspections, and defines and implements tasks to improve safety in all areas. Members of the
safety committee complete periodic visual inspections of employee work activities utilizing an
observation checklist to detail their findings. Recorded observations are discussed and infractions
corrected. Safety is the first topic discussed at all meetings at the generating plant. An indoctrination
video emphasizing safety is shown to all visitors when entering the Station.
There were no restricted work days or lost time accidents reported in FY 2011. NAES ended the year with
22,831 man-hours worked with no OSHA recordable accidents.
Training: The required annual OSHA compliance training is completed and documented for each
employee. A formal two-day employee orientation program is required for all new employees. This
City of Dover, Delaware II-5 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 39
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
orientation covers a multitude of subjects from employee benefits to a review of the various Station
operating manuals.
For operator training, the Employee Development and Qualification Program (EDQP) has been
established. EDQP is a formal program for training operators to progressively advance to positions with
additional responsibilities. In addition to the above programs, cross training of various disciplines also
occurs. An example of cross training would be plant operators training with maintenance staff.
Plant staff receive environmental and safety training online via the GPi Learning website. The training
includes tutorials and exams to ensure comprehension of the subject matter. Plant manuals, meetings, etc.
offer additional safety training.
Four employees completed formal training and received certification for Hazardous Waste Management:
Resource Conservation and Recovery Act (RCRA) and US Department of Transportation (DOT)
Regulations in FY 2011. The training was completed in East Windsor, New Jersey on April 6, 2011 and
administered by Nexeo Solutions of Dublin, Ohio.
Major Equipment Operation and Maintenance: In general, the generation facilities appear to
have been properly operated and maintained, and in good condition as evidenced by the high availability
of the units. The generation facilities are dispatched sparingly and operate primarily as peaking units. As
such, the individual units incur a relatively large number of starts per year and low annual capacity factor.
Table II-3 summarizes the major FY 2011 operating statistics.
The large amount of time that units are not operating allows for maintenance and repair of the units. As a
result, the FY 2011 overall equivalent availability factor for the generation facilities averaged 67.6
percent. Low net capacity factors are partially offset by Pennsylvania New Jersey Maryland
Interconnection (PJM) capacity credits. In FY 2011, approximately $11.4 million of PJM capacity credits
helped cover the fixed operating and maintenance costs of the Electric System. PJM capacity credits are
expected to continue to provide similar benefits in FY 2012 and beyond.
Electronic Management System: Maintenance activities are organized, planned, and managed using
MP2tm by CMMS Data Group, a computer-based management system. All three major categories of
maintenance activities (corrective, preventative, and predictive) are electronically managed by MP2tm.
City of Dover, Delaware II-6 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 40
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
Table II-3
FISCAL YEAR 2011 OPERATING STATISTICS
City of Dover Electric Division
Rated Net Net Heat
Capacity - Production - Net Capacity Rate Number of
Unit Number MW MWh Factor Btu/kWh Starts
VanSant 39 5,148.0 1.43% 13,300 39
McKee Run
Unit 1 17 411.5 0.28% 15,804 3
Unit 2 17 1,408.8 0.95% 13,782 5
Unit 3 102 47,297.8 5.21% 11,464 49
Total 175 54,266.1 3.54% 96
Forced Equivalent
Outage Operating Service Availability
Unit Number Hours Hours Factor Factor
VanSant - 154.7 1.77% 97.17%
McKee Run
Unit 1 579.8 43.0 0.49% 63.18%
Unit 2 - 159.7 1.82% 69.80%
Unit 3 6.3 714.7 8.16% 69.73%
Total 586.1 1,072.1 12.24%
For corrective maintenance activities, any station operator or mechanic can enter a work order into the
system at any terminal on the Station local area network (LAN). A supervisor reviews the request, turns it
into a work order, and assigns a priority according to a predetermined categorization. The work order is
planned, parts are ordered, and then the work order is assigned to an operator or maintenance technician
for completion once the material has been received.
This system is also used to manage and track preventative maintenance activities that follow a schedule.
Changing filters, turning on and off heat tracing are examples of preventative maintenance. Predictive
maintenance activities practiced include oil analyses, vibration testing, and infrared surveys. Portable
vibration testing equipment is used at the Stations to improve the frequency of and capabilities to trouble-
shoot rotating equipment. The technology allows personnel to identify problems and take corrective
actions before equipment failure occurs.
Electric Generation Improvements: The following describes completed, on-going, and planned
improvements to the City’s generation assets:
City of Dover, Delaware II-7 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 41
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
Recently Completed: On-Going:
DOE Grant - Photovoltaic Panels McKee Run Preservation of Structures
McKee Run & VanSant Arc Flash Unit 3 - Gas Modification
McKee Run Driveway Repaving Unit 3 Air Heater Expansion Joint
Unit 3 Fire Protection System Units 1 and 2 Life Extension
Unit 3 Cooling Tower Life Extension Units 1 and 2 Cooling Tower Life Extension
Unit 1 Outage FY 2011 Units 1 and 2 Control Modifications
Unit 2 - Boiler Inspection & Repair McKee Run Equipment Replacements
VanSant CT Mark IV Upgrades
Work Management Software Replacement
Planned:
McKee Run Demineralizer Replacement Unit 3 Turbine Outage/Inspections
McKee Run Turbine Level Window Unit 3 Cooling Water Line Replacement
Modification Unit 3 Generator Repairs
McKee Run High Energy Piping Units 1 and 2 Stack Repairs
Unit 3 - Stack Repairs Units 1 and 2 Boiler Repairs
Unit 3 Boiler Air Heater Units 1 and 2 Component Repairs
Unit 3 Boiler Systems VanSant Capacity Increase
Unit 3 FD and ID Fan Controller Upgrade VanSant Component Replacements
Unit 3 DCS Computers & Software Metering System Upgrades
Upgrades
Unit 3 Auxiliary System Components
Condition Assessment: The following is a summary of the condition assessment of McKee Run
major equipment and VanSant as presented by the NAES Corporation staff. Burns & McDonnell made no
internal assessments of equipment during the facility tour.
Steam Turbines/Generators: The steam turbines and generators for VanSant and McKee Run Units 1
and 2 were reported to be in satisfactory condition with no major problems. McKee Run Unit 3 turning
gear engagement problems were reported in the summer 2010 outage report. Plant staff developed a list of
parts needed to complete the appropriate repairs. Plans were made to replace both mating clutch ends
during the spring 2010 outage. Delays in parts availability postponed the planned repairs until FY 2012.
XL Insurance completes inspections of the Energy Division production facilities on an annual basis. After
each inspection the insurance provider issues a report detailing its risk reduction recommendations. A
recommendation following the FY 2010 inspection addressed safety. XL Insurance recommended the
City of Dover, Delaware II-8 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 42
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
installation of a permanent fire protection system for the turbine generator bearings at McKee Run. The
City completed the installation of the system in FY 2011 for Unit 3. The City and XL Insurance agree that
portable foam generating carts are sufficient fire protection for Units 1 and 2, due to their light use.
In FY 2011, the McKee Run Units 1 and 2 turbine generators were degassed and removal of hydrogen fill
piping was completed. The existing hydrogen fill piping was replaced with stainless steel piping to help
reduce corrosion. Once the piping was installed it was checked for leaks. No leaks were reported. No
other major repairs or replacements were required for the turbine/generators in FY 2011.
Boilers and Auxiliaries: Boiler inspections are conducted every year on each of the boilers. Each fiscal
year, the inspections on each boiler typically include the inspection and cleaning of the major boiler
components, including the mud and steam drums, the forced draft and induced draft fans, the windbox,
condenser water box, condenser tubes, hotwell, air preheater components, and safety valves.
In FY 2010, McKee Run Unit 1 experienced a tube failure and excursion and consequently was shut
down. The City hired a contractor to supply replacement parts and repair the tube by replacing a tube
section. After an internal inspection, plant staff made the decision to replace six additional tubes in Unit
1. The City subsequently hired inspectors to examine the repaired unit and provide recommendations for
additional repairs and inspections. These maintenance recommendations helped determine certain projects
to be completed during future outages.
In FY 2011, outlet duct expansion joint was replaced at Unit 3. Operations removed the appropriate
insulation and lagging to prepare the duct. The Electric Division contracted Apex to complete the
installation the equipment. A complete seam weld was utilized to seal the joint and the job site was
cleaned.
Following its FY 2010 annual inspection of the production facilities, XL Insurance recommended the City
implement a program that tracks annual hot and cold settings of hangers in the steam, reheat, feedwater
and boiler systems. In FY 2011, the City has met the recommendation by implementing a program that
will examine the high energy piping systems on a five-year basis, beginning in 2014.
Station Cooling Water Systems: The Station has split cooling water systems with one system serving
Unit 1 and Unit 2 and a separate system serving Unit 3. Projectile tube cleaning was completed on Unit 1
and Unit 2 condensers during the spring FY 2011 outage. All the tubes in each unit were cleaned utilizing
City of Dover, Delaware II-9 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 43
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
the scraper blade plug method. Samples were taken from the tube cleanings and retained for inspection.
No leaks were detected in the expansion joint or condenser tubes. Each condenser box was cleaned.
Projectile tube cleaning was last completed in the nineteen eighties. The cooling water systems are
reported to be sufficiently sized and in satisfactory condition, with no major issues reported at the time of
this Report.
Fuel Handling Systems: Natural gas comes into the station in a 4-inch diameter pipeline for Unit 1 and
Unit 2 and in a 10-inch diameter pipeline for Unit 3. No. 2 fuel oil is delivered to the station and unloaded
into tanks. Forwarding pumps deliver the fuel oil to each of the units. No major fuel projects were
reported to be completed in FY 2011.
Water Treatment/Steam Purity: Quality control parameters for boiler feed-water, internal boiler water,
cooling tower water, and steam purity are checked at a minimum of twice per day when systems are
operating. Results are recorded and graphically compared to control limits. Adjustments are then made as
required. Boiler feed water is treated city water (well water from City) using a regenerative ion resin
demineralizer system, along with deaeration for oxygen control. Boilers 1 and 2 use a coordinated
phosphate control for boiler internal purity control and Boiler 3 uses a balanced trisodium phosphate and
disodium phosphate within a narrow pH range. A deep-bored water well was installed to provide water in
addition to the city supplied water. City water has a high chlorine level which may exceed the Station
permitted limits. By combining City water with the well water, the chlorine levels can be maintained at
the permitted limits. Water for cooling tower makeup is also obtained from City water. The primary
control parameter is silica concentration. Blow down is adjusted as required to maintain control. The City
is currently undergoing the approval process with Kent County to obtain an integrated waste water permit
to be able to discharge cooling water to the sewer system. No major issues were reported at the time of
this Report.
Steam purity is not continuously monitored. Samples are taken twice daily and tested for pH,
conductivity, and silica. There have not been any problems with steam purity. Annual inspections of the
boiler drums and separation internals have verified that these systems are intact and operating properly.
Following its FY 2010 annual inspection of the production facilities, XL recommended the City
implement lay-up procedures to protect water systems from corrosion. In FY 2011, the City worked to
update plant procedures to conform to NAES standards.
City of Dover, Delaware II-10 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 44
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
In FY 2011, the station did not experience any internal corrosion related failures, steam path deposits, or
excessive condenser fouling. NALCO provides water treatment consulting services and chemicals. A
representative visits the station periodically to review test data and check chemical usage rates. No major
issues were reported at the time of this Report.
Station Electrical Systems: Overall, station electrical systems and transformers are considered to be in
satisfactory condition. A condition assessment of the generation facilities’ transformers was conducted in
February 2011. Oil inspections and analyses were made. The inspector recommended that normal
operation continue for all the transformers at the plant. Oil sampling is now completed twice per year on
the GSUs. All plant transformers are examined annually.
Following its FY 2008 annual inspection of the production facilities, XL recommended the City build
blast walls around transformers at the plant. In FY 2011, the City continued to research blast wall
protection. The revised FY 2012 Capital Budget includes costs for blast wall installation at McKee Run.
Station Control Systems: Unit 1 and Unit 2 controls are electro-pneumatic and Unit 3 controls are a
distributed control system (DCS). During the March FY 2011 spring outage, a controls upgrade was
completed at McKee Run Units 1 and 2. The new devices will control igniters, pilots and shut down main
fuel to protect the boiler. The project included the installation of new limit switches on main gas, pilot
gas, and oil supply/return valves. The controls upgrades help the system meet national fire protection
codes.
Following its 2007 annual inspection of the production facilities, XL Insurance recommended the City
seal openings in fire barriers through which cables pass. The City has worked each year since to make
progress on sealing openings in fire barriers. The City intends to seal the rest of the openings as part of its
boiler controls and control room upgrades.
In general, the station control systems are considered to be in satisfactory condition. The Unit 1 and
Unit 2 control systems are outdated but perform satisfactorily. All relays have recently been inspected at
both McKee Run and VanSant for North American Electric Reliability Corporation (NERC),
Pennsylvania-New Jersey-Maryland (PJM) Interconnection and Mid-Atlantic Area Council (MAAC)
compliance. The EHC system will be modified in the future to become a primary/primary system. No
major issues were reported at the time of this Report.
City of Dover, Delaware II-11 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 45
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
General Facilities: No major projects or improvements were completed to the General Facilities in FY
2011 other than routine maintenance and repairs. In general, the station facilities appeared clean and well
maintained during the site visit.
VanSant Generating Station: In general, the unit is operated infrequently, but is well maintained.
Although the station is only manned when operating, an operator performs a twice daily walk through
with a checklist of items to review and the results are logged. The annual overhaul and inspections were
conducted at VanSant during FY 2011. No major problems were found.
The VanSant unit now has the capability of completing black starts. Upgrades have been made to provide
the capability of remote control of the unit; however, complications have not made remote control
possible.
XL Insurance completes inspections of the Energy Division production facilities on an annual basis. After
each inspection the insurance provider issues a report detailing its risk reduction recommendations. The
lone recommendation for VanSant following the FY 2011 inspection addressed safety. XL Insurance
recommended the installation of gas detection equipment at the plant. The City is making an effort to
meet this recommendation. No date has been set for its expected completion. No other major repairs or
upgrades were made at VanSant in FY 2011.
Transmission and Distribution Systems
On February 22, 2012, Mr. Ted Kelly visited the City to collect information and to observe the City
transmission and distribution system, as operated and maintained by the Electric Division. Mr. Steve
Enss, the Engineering Services & System Operations Superintendent, provided information related to the
transmission and distribution system. Mr. Enss also led a tour of the electric transmission and distribution
system.
The Electric Division distributes power to its customers by a network of transmission lines, distribution
substations, and distribution lines. The transmission lines are rated at 69 kV and are connected to fifteen
distribution substations located throughout the service area. The distribution substations reduce the power
from transmission voltages to the primary distribution voltages of 12 kV to facilitate distribution of
electric power to customers.
City of Dover, Delaware II-12 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 46
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
Safety: Mr. Jeremy Johnson – Public Utilities Director for the City, reported to Burns & McDonnell
that there were no reportable injuries or lost workdays in FY 2011.
System Reliability: The Electric Division provides for reliability of its distribution system by
configuring a majority of its distribution circuits in primary open loop arrangements, improving existing
circuits, and installing adequate substation transformer capacity. Normal transformer and line loading are
limited to provide sufficient margin to convey firm power requirements during an emergency or a
switching operation, or for maintenance.
Power Quality: The Electric Division does not have any significant power quality problems. The
overall power factor for the Electric System decreased from approximately 98.72 percent in FY 2010 to
98.43 percent in FY 2011. Power transformers are equipped with load tap changers regulate bus voltages
at the distribution substations. Distribution transformers are equipped with no-load taps to make voltage
adjustments. There are capacitors and voltage regulators on the Electric System that control voltage and
vars on the portion of the system furthest away from the current source and generation. The system
operators monitor the power factor closely and turn on capacitors or adjust the generation to compensate
for low power factors.
Operations and Maintenance: The Electric Division has a SCADA system that is monitored
continuously for any problems that may arise in the Electric System. The main control room has two
system operator desks and a large screen where system operating information is displayed. System
operators can monitor the Electric System operation, such as voltage levels, current flows, etc. and make
necessary adjustments as problems arise. The systems operators have received some PJM training, but are
not required to be certified as Delmarva Power is the controlling agency.
Loading on substation transformers used for an emergency, a switching operation, or maintenance is
limited to 120 percent of the rated capacity, followed by a twelve-hour cool-down period. The Electric
Division has nine line crews to work on the system. Four crews are responsible for overhead lines, four
crews are responsible for underground lines, and one crew is responsible for maintenance. The primary
responsibilities of the eight line crews are installation of new service connections and construction of new
lines. The Trouble crew maintains the street lights, repairs underground services and is the first responder
to outages. Tree trimming is contracted out and is no longer performed by the Electrical Division;
however, their performance is monitored by the Line Crew Superintendent.
City of Dover, Delaware II-13 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 47
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
The Substation/Relay Maintenance Division is responsible for operation and maintenance of the
substations and associated equipment. They perform visual inspections of substations, associated
equipment, trip counter checks, battery systems checks, and oversee annual transformer condition
assessments.
TJ/H2b Analytical Services completed the annual transformer condition assessments in February FY
2011. No abnormal gas was indicated and since the oil condition was within acceptable parameters,
TJ/H2b recommended the continuation of normal operation. The City has a contract with an
environmental consultant to check each substation for oil leaks and to provide instruction on cleaning up
in the event of an oil spill.
The City contracts with an outside firm to inspect and chemically treat each wood pole in the Electric
System every ten years. This is accomplished by awarding a five-year contract to spread out the expenses.
No pole treatments were reported completed in FY 2011.
Design Standards and Specifications: The Electric Division designs the transmission and
distribution circuits and some substation upgrades in conformance with national safety standards. Other
substation and transmission design is contracted to Pike Electric, Inc.
The underground distribution design utilizes road or alley front access construction. This design means
the electrical equipment, such as transformers and underground cable, are installed beside the road instead
of behind houses or buildings. The advantage of front access construction is the accessibility for
maintenance and repairs to cable and electric equipment. The underground cables are installed in PVC
pipe for added protection and for easy cable replacement. The Electric Division installs jacketed,
concentric cable that is rated at 15 kV, with 133 percent Ethylene Propylene Rubber (EPR) insulation.
The standard overhead distribution design utilizes a flat construction using a single cross-arm and
insulators on 45-foot class 2 poles. Typically all electrical equipment locations have ground rods installed
with measured readings of 25 ohms or less.
The substation design is generally a low-profile rigid bus design. The circuit breakers are SF6 gas-filled
and the relays are microprocessor based with SCADA control and monitoring.
City of Dover, Delaware II-14 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 48
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
Transmission and Distribution Capital Improvements: The following describes completed,
on-going, and planned improvements to the City’s transmission and distribution assets:
Recently Completed: On-Going:
69-kV Feeders 3 and 4 Distribution System Upgrades
Replacement of 69-kV Breakers & Design Lighting Project and Rehabilitation
Governors Avenue Rebuild
Mid City Substation Upgrades Substation PT and CT Replacement
69-kV Substation Switch Replacement New Developments – Underground
New Developments – Underground Transformers
Conductors and Devices
Single Phase Meters
Planned:
Horsepond Road Substation Reliability Distribution Capacitors - Underground
Upgrade Outage Management System
Replace Substation Equipment and Fencing System Automation & SCADA Equip.
McKee Run Yard Rebuild Frazier Substation Reliability Upgrade
North Street 69-kV Cable Replacement Horsepond Substation to Cartanza 69-kV
Distribution Feeder Replacement Program Rebuild
Transmission Relaying, Replacement and 69-kV Substation Switch Replacement
Calibrations General Scott Switchgear
Distribution Capacitors - Overhead
Condition Assessment: The transmission and distribution system assessment included drive-by
observations of a sample of the transmission circuits, distribution circuits, and substations. Most of the
fifteen substations were physically observed during the tour. The following substations were observed
during the tour:
Mid City Substation Division Street Substation
Frazier Substation St. Jones Substation
North Street Substation Horsepond Substation
General Scott Substation Cartanza Substation
Lebanon Substation
The first stop during the transmission and distribution system evaluation was the Mid City Substation. In
FY 2011, breaker change outs were completed. The oil breakers were replaced with SF6 breakers at the
City of Dover, Delaware II-15 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 49
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
substation. Routine maintenance was completed at the Frazier Substation in September 2010 and
reliability upgrades are scheduled to begin in FY 2012. Switch replacement was completed at the North
Street Substation and cable replacement is on the Electric Division’s five-year capital plan. Switches were
replaced at the General Scott Substation and the 69-kV breakers were replaced. The switchgear is
scheduled for replacement in FY 2015 at the General Scott Substation.
The Lebanon, Division Street, St. Jones, and Horsepond Substations appeared to be in good condition.
Routine maintenance was completed in FY 2011 at these locations. There was little to no vegetation
visible and the yards appeared to be well maintained.
The Cartanza Substation was observed during the system tour. Cartanza is a 230/69-kV substation, which
serves as a tie with Delmarva. Delmarva maintains the 230-kV side of the station, while the City of Dover
maintains the 69-kV side. In FY 2011, tap changer seals were replaced at the substation. The Electric
Division works Delmarva Power on transformer testing. Cartanza currently has four 69-kV lines leaving
the station. The four circuits leave the station on two diverse pole lines, each holding a double circuit,
until the circuits split down the line. This configuration allows for two separate loops for the entire 69-kV
system to minimize total system failure should one common pole be critically damaged.
Along the transmission and distribution system tour route, additional projects were detailed. The
replacement of old underground circuits was completed in December FY 2011. Also, a number of
insulators were replaced due to some breakdowns primarily due to age. Specifically, a transmission line
near McKee Run had to be replaced because of the continual damage sustained by cooling tower exhaust.
Another transmission line connecting a 10-MW Sun Power solar project was completed during the fall of
FY 2011. Force labor completed the job. The transmission line featuring composition poles was
completed in time to shave 6 MW from the system peak.
In addition, the tour included driving through several residential areas that are served by underground
distribution lines. The pad mounted transformers observed along the way appeared to be in good
condition.
Conclusions
Based on statements and information provided, as well as the observations and reviews performed, it is
the opinion of Burns & McDonnell that the City’s power generation facilities are being operated and
maintained consistent with accepted electric utility practice in the United States. In general, the
City of Dover, Delaware II-16 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 50
2011 Engineering Consultant’s Report Part II – Electric System Overview and Assessment
performance, operation, maintenance, staff, planning, and training aspects for the McKee Run and
VanSant stations were found to be above average. Specifically, the generation facilities have
demonstrated a high level of availability despite the dispatching of the units primarily for peak demand.
It is the opinion of Burns & McDonnell that the design, construction, operation and maintenance of the
City’s electric transmission and distribution system and the associated facilities are consistent with
current generally accepted electric utility standards. In completing Annual Engineering Consultant’s
Reports over the past several years, Burns & McDonnell has observed that the City has done a good job
of making appropriate system upgrades and improvements. The City and the Electric Division are
proactive in preventative maintenance and expansion of the Electric System before problems arise.
*****
City of Dover, Delaware II-17 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 51
PART III – FINANCIAL ASSESSMENT
Page 52
2011 Engineering Consultant’s Report Part III – Financial Assessment
PART III
FINANCIAL ASSESSMENT
The financial results of the City of Dover, Delaware (City) Electric System for the fiscal year (FY) ended
June 30, 2011, were generated through the management and operation of the Electric System by the
Electric Division. A review of the financial results is provided below.
FINANCIAL RESULTS
The total revenue of the Electric Division during FY 2011 included revenue from charges for electric
service, as well as miscellaneous revenues from items such as rents, penalties, reconnection fees, and
emission credits. On the Comparative Statement of Revenues, Expenses, and Changes in Unreserved
Retained Earnings table, revenues were compared to the Electric Division’s costs of providing services to
its customers to determine whether the financial requirements of the Electric Division were met.
Required Revenue Level
The level of revenues required from the retail electric rates for the Electric Division were determined
through the analysis of the financial results and net income or net margins for the most recent fiscal year.
The City of Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted
December 23, 1985 requires that the Electric Division maintain a debt service coverage ratio of 1.25. The
following is an excerpt from Section 502(c) of the resolution.
“(c) The total amount of the Revenues of the Electric System during the preceding fiscal year
shall have been not less than the total of the following:
(1) The Current Expenses of the Electric System during the current fiscal years shown by the
Annual Budget . . . for such fiscal year, and
(2) One hundred twenty-five percent (125%) of the maximum amount of the Principal and
Interest Requirements for any fiscal year thereafter on account of all bonds then Outstanding
under the provisions of this Resolution.
The City further covenants that, from time to time and as often as it shall appear necessary, it will
adjust the electric rates as may be necessary or proper so that the revenues of the Electric System in
each fiscal year will not be less than the total of the amounts set forth in subdivision (c) of this
section.”
City of Dover, Delaware III-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 53
2011 Engineering Consultant’s Report Part III – Financial Assessment
Electric Rates
Customers of the Electric Division of the City are charged for the electric service based on rate schedules,
tariffs, or contracts that reflect the costs to the Electric Division of providing that service. For purposes of
setting electric rates, customers with similar load and service characteristics should be placed in the same
rate classification.
A comprehensive cost-of-service and rate design study was completed in 2006 and subsequent rate
analyses were completed in 2007 and 2008 to examine revenue requirements and revenue generation.
Specifically, the 2006 rate study was conducted to address increased costs associated with a new power
supply contract that became effective on July 1, 2006. The rate study recommended combining a number
of rate classes and implementing rate increases on July 1, 2006. The 2006 rate study also recommended
an additional increase be implemented on January 1, 2007 to cover increased costs associated with
operating the generating station. The 2007 and 2008 rate analyses re-examined Electric Division revenues
and expenses and recognized additional revisions to power supply costs. As a result of these analyses,
additional rate increases were implemented on July 1, 2007 and July 1, 2008. The July 2008 study
established the rate schedules utilized by the Electric Division today. The current rate classes are listed
below.
Residential Primary
Small Commercial (1 Phase, 3 Phase, 1 Transmission
Phase Heating, Church, and Municipal) Outdoor Development Lighting
Medium Commercial (1 Phase & 3 Phase) Private Outdoor Lighting
Large Commercial (3 Phase with Reactive Water Pumping
Metering) Supplemental for NRG
The City has retained Burns & McDonnell to begin a comprehensive cost-of-service and rate design study
in fourth quarter FY 2012. The study will examine revenue adequacy, revenue responsibility, and revenue
recovery for the Electric Division. The FY 2012 study will scrutinize customer classes and propose
adjustments for demand rate components and any corresponding changes to energy charges.
Operating Results
Table III-1 presents a summary of the annual energy sales, the average monthly number of customer
accounts, and the annual average kilowatt-hour (kWh) energy per customer of the Electric Division for
FY 2009 through FY 2011. After reaching a low in FY 2010 for the three-year period, annual energy
City of Dover, Delaware III-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 54
2011 Engineering Consultant’s Report Part III – Financial Assessment
sales increased to 734.1 GWh in FY 2011. On a percentage basis, the one-year increase equaled 3.6
percent.
Table III-1
ANNUAL SALES AND CUSTOMERS
City of Dover Electric Division
FY 2009 FY 2010 FY 2011
Energy Sales (kWh)
Residential 195,185,587 193,911,702 208,092,047
Commercial 248,757,087 237,608,938 243,985,517
Primary 156,096,547 148,381,527 153,879,249
Transmission 119,910,158 128,628,155 128,146,159
Total Energy Sales 719,949,379 708,530,322 734,102,972
Average Number of Customers (bills)
Residential 19,685 19,785 19,730
Commercial 3,497 3,371 3,140
Primary 37 36 42
Transmission 4 4 3
Total Customers 23,223 23,196 22,915
Energy Per Customer
Residential 9,915 9,801 10,547
Commercial 71,131 70,493 77,702
Primary 4,209,345 4,102,715 3,663,792
Transmission 30,615,359 32,157,039 42,715,386
Average Energy Per Customer 31,001 30,546 32,036
Table III-2 presents revenues from sales, revenue per kWh ratios, and average revenue per customer ratios
for each revenue classification. Total revenue from sales to electric customers in FY 2011 was
approximately $99.5 million, representing an increase of $1.4 million, or 1.5 percent from FY 2010. Total
revenue from sales to electric customers includes utility tax revenue and power cost adjustment revenue.
In FY 2011, the average rate revenue per kWh for residential customers was 14.79 cents and the total
average rate revenue was 13.56 cents per kWh. The July 2010, through June 2011 national average
monthly utility-level retail sales of electricity and associated revenue per kWh, as published by the US
Energy Information Administration (EIA), were 11.66 and 9.91 cents per kWh, respectively. For a state-
wide comparison, the EIA summarized the Delaware July 2010, through June 2011 average monthly
City of Dover, Delaware III-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 55
2011 Engineering Consultant’s Report Part III – Financial Assessment
utility-level retail sales of electricity and associated revenue per kWh to be 13.86 cents per kWh for
residential customers and 11.90 cents per kWh across all sectors.1
Table III-2
ANNUAL REVENUES AND SALES RATIOS
City of Dover Electric Division
FY 2009 FY 2010 FY 2011
Revenue
Residential $ 29,553,954 $ 29,320,410 $ 30,774,462
Commercial 37,547,855 36,856,716 36,572,134
Primary 18,988,842 18,025,548 18,450,238
Transmission 13,551,839 13,878,764 13,716,322
Total Revenue $ 99,642,490 $ 98,081,438 $ 99,513,156
Revenue/kWh
Residential $ 0.1514 $ 0.1512 $ 0.1479
Commercial 0.1509 0.1551 0.1499
Primary 0.1216 0.1215 0.1199
Transmission 0.1130 0.1079 0.1070
Total Revenue/kWh $ 0.1384 $ 0.1384 $ 0.1356
Revenue Per Customer
Residential $ 1,501 $ 1,482 $ 1,560
Commercial 10,737 10,935 11,647
Primary 512,059 498,402 439,291
Transmission 3,460,044 3,469,691 4,572,107
Average Revenue Per Customer $ 4,291 $ 4,228 $ 4,343
The Electric Division’s largest cost in providing electric service to its customers in FY 2011 was the
wholesale cost of power. The Electric Division purchased power from the PJM Interconnection
marketplace through its Energy Manager, PACE. From FY 2010 to FY 2011, the net cost of non-
generated power decreased from $66.8 million to $62.7 million. The cost of non-generated power
includes energy and demand costs, power supply management expense, PJM charges and credits,
generation fuels cost, and capacity charges and credits. Reduced demand and energy costs were the main
driver behind the reduction in net cost of non-generated power.
The significance of power supply cost to the Electric Division is illustrated in Table III-3. The top portion
of the table shows net operating revenue as the difference between total revenues generated by the rates
1
US Energy Information Administration, Form EIA-826 Data Monthly Electric Utility Sales and Revenue Data,
http://www.eia.gov/cneaf/electricity/page/sales_revenue.xls (Mar. 19, 2012)
City of Dover, Delaware III-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 56
2011 Engineering Consultant’s Report Part III – Financial Assessment
and the cost of power supply.2 The ratios of power supply cost to sales revenues were calculated for FY
2009 through FY 2011. As illustrated, the Electric Division’s power supply cost as a percentage of rate
revenue decreased from approximately 74.1 percent in FY 2010 to 70.0 percent in FY 2011.
Table III-3
NET REVENUE MARGINS AND UNACCOUNTED FOR ENERGY
City of Dover Electric Division
FY 2009 FY 2010 FY 2011
Net Revenue Margins ($)
Sales Revenues $ 99,642,490 $ 98,081,438 $ 99,513,156
Power Supply 74,928,897 72,695,602 69,616,076
Net Revenue Margin $ 24,713,593 $ 25,385,836 $ 29,897,080
Net Revenue Ratio 75.2% 74.1% 70.0%
Unaccounted for Energy (kWh)
Power Supply 751,171,000 751,250,000 768,254,000
Energy Sales 719,949,379 708,530,322 734,102,972
Unaccounted for Energy (Losses) 31,221,621 42,719,678 34,151,028
Percentage 4.2% 5.7% 4.4%
Table III-3 also illustrates the ratio of the amount of energy purchased and delivered to the electric system
to total energy sales. This relationship identifies the level of unaccounted for energy in the Electric
System. This unaccounted for energy may include energy that was unmetered, metered inaccurately,
stolen, lost, PJM transmission line losses, local system line/transformer losses, etc. The bottom portion of
Table III-3 presents these comparisons for the Electric Division for FY 2009 through FY 2011. As shown,
the percentage ratio of the unaccounted for energy to the total energy purchased for FY 2011 was 4.4
percent. This is down from 5.7 percent in FY 2010.
Table III-4 presents a re-creation of the Electric Division’s Statement of Revenues, Expenses, and
Changes in Unreserved Retained Earnings for the Electric Revenue Fund for FY 2009 through FY 2011.
Net income was down slightly from FY 2010, totaling $3.2 million in FY 2011. Increased charges for
electric service and reduced operating expenses equated to $2.9 million increase in net operating income
2
For the purposes of this Report, the phrase “Power Supply” refers to the sum of the costs of power purchased and
power generated. This includes plant costs and the cost of fuel. Power Supply also includes any expenses in the CIP
Fund that are not capital expenses. The phrase “Purchased Power” refers only to the cost of power purchased from
the market and other directly associated costs.
City of Dover, Delaware III-5 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 57
2011 Engineering Consultant’s Report Part III – Financial Assessment
for the year; however, operating transfers out resulted in an annual net income decrease. Annual operating
transfers out totaled ($8.9) million, the highest total for the past ten years.
Table III-4
COMPARATIVE STATEMENT OF REVENUES, EXPENSES, AND
CHANGES IN UNRESERVED RETAINED EARNINGS
City of Dover Electric Division
FY 2009 FY 2010 FY 2011
Operating Revenues:
Charges for Electric Service $ 99,642,490 $ 98,081,438 $ 99,513,157
Miscellaneous Services/Incomes 1,778,492 2,197,036 2,389,462
Total Operating Revenues $ 101,420,982 $ 100,278,474 $ 101,902,619
Operating Expenses:
General Administration $ 4,084,382 $ 5,529,887 $ 5,298,869
Power Supply 74,928,897 72,695,602 69,616,076
Transmission/Distribution 4,032,931 3,146,123 3,083,714
Engineering 2,393,416 1,465,740 1,722,244
Metering 285,118 301,416 204,352
System Operations 559,743 496,195 486,894
Utility Tax 1,738,059 1,922,645 1,944,543
Depreciation 3,898,475 4,106,802 4,710,658
Retiree Health Care 1,830,903 531,843 1,839,110
Total Operating Expenses $ 93,751,924 $ 90,196,253 $ 88,906,460
Net Operating Income $ 7,669,058 $ 10,082,221 $ 12,996,159
Non-operating Revenues (Expenses)
Interest Earned
Operating Fund $ 141,310 $ 37,849 $ 832,145
Reserved Funds 1,041,655 865,878 511,922
Net Increase in Fair Value of Investments 239,624 (168,775) (861,216)
Interest and Fiscal Charges (726,448) (648,581) (1,385,035)
Bond Discount Amortized (113,206) (113,206) (21,579)
Gain/(Loss) on Sale of Assets 115,638 17,984 16,830
Total Non-operating Revenues(Expenses) $ 698,573 $ (8,851) $ (906,933)
Net Income Before Operating Transfers $ 8,367,631 $ 10,073,370 $ 12,089,226
Operating Transfers - In 1,332,350 - -
Operating Transfers - Out (6,758,100) (6,758,100) (8,856,000)
Total Net Operating Transfers $ (5,425,750) $ (6,758,100) $ (8,856,000)
Net Income $ 2,941,881 $ 3,315,270 $ 3,233,226
City of Dover, Delaware III-6 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 58
2011 Engineering Consultant’s Report Part III – Financial Assessment
Adequacy of Electric Rates
The City’s Bond Resolution requires annual revenues of the Electric Division be no less than the total
current expenses plus 125 percent of the greatest remaining annual debt service. “Current expenses”, as
defined in the Resolution, includes all expenses necessary to maintain and repair the Electric System, all
administrative expenses, and engineering, legal or other consultant fees. Transfers to reserve accounts and
special purpose funds, and allowances for depreciation are specifically excluded from “current expenses.”
In order to determine if the City and the Electric Division have met this requirement, the net income
shown in Table III-4 was adjusted to include the interest on bonds, depreciation expense, and other non-
cash income and expenses. Table III-5 presents the adjustments to net income and the determination of
the revenues available for debt service for FY 2009 though FY 2011.
Table III-5
DEBT SERVICE COVERAGE CALCULATION
City of Dover Electric Division
FY 2009 FY 2010 FY 2011
Net Income $ 2,941,881 $ 3,315,270 $ 3,233,226
Plus Excluded Expenses:
Operating Transfers - In $ (1,332,350) $ - $ -
Operating Transfers - Out 6,758,100 6,758,100 8,856,000
Depreciation 3,898,475 4,106,802 4,710,658
Interest and Fiscal Charges 726,448 648,581 1,385,035
Bond Discount Amortized 113,206 113,206 21,579
Gain/(Loss) on Sale of Assets (115,638) (17,984) (16,830)
Less Excluded Income:
Net Increase in Fair Value of Investments (239,624) 168,775 861,216
Interest Earned - Reserve Funds (1,041,655) (865,878) (511,922)
Revenues Available for Debt Service $ 11,708,843 $ 14,226,872 $ 18,538,962
Maximum Principal and Interest in Any Year $ 4,058,700 $ 3,347,479 $ 3,401,954
Debt Service Coverage 2.88 4.25 5.45
Minimum Required Debt Service Ratio 1.25 1.25 1.25
As Table III-5 illustrates, the City and the Electric Division maintained a debt service coverage ratio each
year that exceeded the required 125 percent plus current expenses. Therefore, the revenues generated by
the current electric rates have been sufficient to meet the applicable covenants of the Resolution.
City of Dover, Delaware III-7 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 59
2011 Engineering Consultant’s Report Part III – Financial Assessment
Section 502 of the Resolution requires that the annual debt service used in evaluating the revenues is to be
the maximum amount for any fiscal year thereafter. Table III-6 presents the annual totals of principal and
interest amounts due on bonds currently outstanding. The calculation of the debt service coverage ratio in
Table III-5 is based on the total maximum debt service expense in any fiscal year. The FY 2011
calculation was based on the total FY 2016 debt service expense of $3,401,954.
STATUS OF REVENUE BONDS
At the end of FY 2011, the City had two series of outstanding electric revenue bonds that were issued
pursuant to the Resolution. The 2004 Electric Revenue Bonds (2004 Bonds) were issued in 2004, in the
amount of $22,535,000. These bonds were issued to refund the 1990 and 1993 bonds. On July 1, 2008,
the City issued $22,200,000 in Electric Revenue Bonds (2008 Bonds). The proceeds from the sale of the
2008 Bonds were used (i) to finance or reimburse the City for improvements to the City’s electric system;
(ii) to fund a Debt Service Reserve Fund; and (iii) to pay the costs of issuance of the 2008 Bonds.
On November 17, 2010, the City issued $8,810,000 of Electric Revenue Refunding Bonds (Series 2010).
The proceeds from the sale of the Series 2010 Bonds will be used (i) to refund the Series 2004 Bonds, and
(ii) to pay the costs of issuance of the Series 2010 Bonds. The non-taxable Series 2010 Bonds received an
underlying rating of Aa2 by Moody’s Investors Services and an underlying rating of A+ by Fitch Ratings.
Table III-6 illustrates the debt service schedule for the Series 2008 and 2010 Bonds. The principal and
interest and the annual total are shown for each series of bonds. At the time of issuance of the Series 2010
Bonds, the combined outstanding principal balance for both series of bonds was $30,280,000.
Table III-6
DEBT SERVICE SCHEDULE OF ELECTRIC REVENUE BONDS
City of Dover Electric Division
2008 Electric Revenue Bonds 2010 Electric Revenue Refunding Bonds Total Annual
Period Principal Interest Debt Service Principal Interest Debt Service Debt Service
FY 2012 $ 390,000 $ 1,028,404 $ 1,418,404 $ 1,670,000 $ 178,267 $ 1,848,267 $ 3,266,671
FY 2013 410,000 1,006,954 1,416,954 1,700,000 253,100 1,953,100 3,370,054
FY 2014 430,000 986,454 1,416,454 1,740,000 219,100 1,959,100 3,375,554
FY 2015 450,000 964,954 1,414,954 1,810,000 166,900 1,976,900 3,391,854
FY 2016 475,000 942,454 1,417,454 1,890,000 94,500 1,984,500 3,401,954
FY 2017 695,000 918,704 1,613,704 - - - 1,613,704
FY 2018 730,000 883,954 1,613,954 - - - 1,613,954
FY 2019 765,000 847,454 1,612,454 - - - 1,612,454
FY 2020 800,000 815,706 1,615,706 - - - 1,615,706
FY21-34 16,325,000 6,618,185 22,943,185 - - - 22,943,185
Total $21,470,000 $ 15,013,223 $36,483,223 $ 8,810,000 $ 911,867 $ 9,721,867 $46,205,090
City of Dover, Delaware III-8 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 60
2011 Engineering Consultant’s Report Part III – Financial Assessment
INSURANCE
The City maintains a comprehensive insurance program to insure against varying types of liabilities and
significant losses related to various Electric Division properties. Section 706 of the Resolution reads:
"The City covenants that it will maintain a practical insurance program, with reasonable
terms, conditions, provisions and costs, which the City Manager determines, with the
approval of the Engineering Consultants, will afford adequate protection against loss,
including loss of Revenues, caused by damage to or destruction of the Electric System or
any part thereof and also comprehensive public liability insurance on the Electric System
for bodily injury and property damage in such amounts as may be approved by the
Engineering Consultants.”
Tables III-7 and III-8 summarize itemized insurance coverage procured by the City for the period July 1,
2011, through June 30, 2012. Burns & McDonnell has reviewed this list of insurance, and in the opinion
of Burns & McDonnell, as Engineering Consultant and not as insurance counselor, the insurance in full
force and affect appears to satisfy the requirements of Section 706 of the Resolution.
OPERATING AND RESERVE ACCOUNTS
The Electric Revenue Fund and the Electric Improvement & Extension (I&E) Fund are the City’s two
funds devoted to the Electric Division. The funds are used to manage cash and transactions related to
utility operations and capital expenditures, respectively. Each fund includes certain cash accounts
established to ensure that moneys are available for specific purposes when they are needed. The accounts
maintained within the Revenue and I&E Funds are listed herein.
Electric Revenue Fund Electric Improvement & Extension Fund
Insurance Reserve Account Depreciation Reserve Account
Contingency Reserve Account Future Capacity Reserve Account
Electric Rate Stabilization Reserve Account
Interest and Sinking Account
The following are descriptions of each Fund, their respective accounts and their purposes.
Electric Revenue Fund: The Electric Revenue Fund was established in Section 503 of the
Resolution. All revenues are to be deposited into the Electric Revenue Fund when received. Current
expenses are to be paid and other accounts are to be maintained from the Electric Revenue Fund. Moneys
City of Dover, Delaware III-9 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 61
2011 Engineering Consultant’s Report Part III – Financial Assessment
are transferred from the Electric Revenue Fund to the Electric Rate Stabilization Reserve Account, the
Interest and Sinking Account, the I&E Fund, the Depreciation Reserve Account, and the Future Capacity
Reserve Account.
Insurance Reserve Account: The Insurance Reserve Account was established by the City to provide for
the funding of insurance deductibles in the event of loss(es) covered by the City’s insurance policies then
in effect. The target minimum balance in the Insurance Reserve is $350,000. The reserve balance at the
end of FY 2011 was $403,334.
Contingency Reserve Account: The Contingency Reserve Account was established by the City in FY
2003 to provide for unplanned expenditures that may not be avoidable. The City’s Financial Policies
require that a minimum balance be maintained in the Contingency Reserve Account equal to 1.0 percent
of the current year revenues for the Electric Revenue Fund. The FY 2011 year-end balance was
$1,056,788, which is equal to 1.04 percent of the FY 2011 revenues for the Electric Revenue Fund.
Electric Rate Stabilization Account: The Electric Rate Stabilization Reserve Account was established in
FY 2005 to offset the costs of the power cost adjustment to the customers of Dover. The account’s target
balance is a minimum of 3.0 percent, not to exceed 10.0 percent, of purchase power cost in any given
year. Any excess of this amount will be refunded to customers by reducing the rate of the power cost
adjustment. The account’s FY 2011 end-of-year balance was $6,160,167, which was 9.8 percent of the
FY 2011 purchased power cost.
Interest and Sinking Account: The Interest and Sinking Account was established in Section 507 of the
Resolution. This account consists of two restricted accounts: the Bond Service account and the Reserve
Account. The Bond Service Account is funded with equal monthly transfers from the Electric Revenue
Fund such that the balance, as of each payment date for interest or for principal and interest, will be equal
to the amount of the payment due. The payments of principal and interest due on bonds are made from the
Bond Service Account. The Reserve Account is funded by transfers from the Electric Revenue Fund, as
necessary, to maintain a balance equal to the maximum combined principal and interest for any future
fiscal year through the life of all bonds then outstanding. Moneys in the Reserve Account are used for
paying interest on and principal of bonds when the balance in the Bond Service Account is insufficient
for making those payments. Excess moneys in the Reserve Account are also used towards paying current
interest payments. The total amount in the Restricted Accounts for the 2004 and 2008 bonds as of June
30, 2010, was $3,519,382.
City of Dover, Delaware III-10 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 62
2011 Engineering Consultant’s Report Part III – Financial Assessment
Electric Improvement and Extension Fund: The I&E Fund was established in Section 507 of
the Resolution. Funds are added to the I&E Fund from the Electric Revenue Fund to the extent that the
amount of funds available from the Electric Revenue Fund exceeds the total of the amounts required to be
added to the Interest and Sinking Account. The I&E Fund also receives additional funding from the
Depreciation Reserve Account, the Future Capacity Reserve Account, the Insurance Reserve Account,
and from the State of Delaware. Section 510 of the Resolution indicates that, except for certain situations,
moneys held in the I&E Fund are to be used only for payment of costs of unusual maintenance or repairs,
renewals or replacements, obtaining or replacing equipment, constructing extensions, additions, or
improvements, and engineering expenses related to the foregoing activities.
Depreciation Reserve Account: The Depreciation Reserve Account represents moneys that have been
set aside for the sole purpose of funding renewals and replacements of the Electric System as components
or equipment wear out, deteriorate, or otherwise become unsuitable for the intended purpose. Transfers
from the Electric Revenue Fund and investment earnings are the only sources of additional moneys for
the Depreciation Reserve Account. Transfers to the I&E Fund are made as necessary to fund capital
projects. The target appropriation for the Depreciation Reserve Account each year is the excess of
depreciation expense for the year over the amount of principal included in debt service payments made
during the year. The reserve balance at the end of FY 2011 was $10,412,221.
Future Capacity Reserve Account: The Future Capacity Reserve Account was established to set aside
and accumulate funds from the Electric Revenue Fund for use in evaluating and pursuing activities related
to the Electric Division’s alternatives for power supply resources for future demand for electricity. The
original target balance for this reserve was $5,000,000. The reserve balance at the end of FY 2011 was
$9,178,771.
Table III-9 presents FY 2009 through FY 2011 year-end summaries of the activity within the cash
accounts described above. The Insurance Reserve Account, the Contingency Reserve Account, the
Electric Rate Stabilization Reserve Account, and the Interest and Sinking Account are accounts within the
Electric Revenue Fund. The Depreciation Reserve Account and the Future Capacity Reserve Account are
accounts within the I&E Fund.
City of Dover, Delaware III-11 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 63
2011 Engineering Consultant’s Report Part III – Financial Assessment
Table III-7
SCHEDULE OF INSURANCE COVERAGE IN EFFECT
City of Dover Electric Division
July 1, 2011 -
Starr Technical Risks Agency June 30, 2012
Coverage
Property
Earth Movement -Per Occurrence and in the $20.000,000
Annual Aggregate, except
Earth Movement in High Hazard Earth Movement EXCLUDED
Zones;
Earth Movement in California; EXCLUDED
Flood -Per Occurrence and in the Annual 10,000,000
Aggregate;
Accounts Receivable; 100,000
Business Interruption; EXCLUDED
Contingent Time Element Coverage; EXCLUDED
Debris Removal (or 25% of Direct Property Loss, whichever the greater); 2,500,000
Demolition and Increased Cost of Construction; 10,000,000
EDP Media; 1,000,000
Errors and Omissions; 2,000,000
Expediting Expense; 1,000,000
Extra Expense, excluding replacement power or increased cost of generation, 2,000,000
transmission and/or distribution of electricity, water or natural gas;
Fire Department Service Charges and Extinguishing Expenses; 500,000
Hazardous Substances -Per Occurrence and in the Annual Aggregate; 500,000
Inland Transit; 2,500,000
Newly Acquired Locations -90 Days reporting; 1,000,000
Personal Property Temporarily Off Premises; 100,000
Professional Fees; 250,000
Incidental Course of Construction; 5,000,000
Miscellaneous Unnamed Locations (except perils of Flood, Earth Movement and 500,000
Valuable Papers and Records; 100,000
Deductibles
For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its
own account an initial amount of:
In respect of Damage to Insured Property:
$350,000 per Occurrence, except;
$100,000 per Occurrence as respects Transit.
In respect of Time Element loss (Extra Expense):
45 days per Occurrence, except;
72 hours per Occurrence in respect of Service Interruption.
City of Dover, Delaware III-12 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 64
2011 Engineering Consultant’s Report Part III – Financial Assessment
Table III-8
SCHEDULE OF INSURANCE COVERAGE IN EFFECT
City of Dover Electric Division
July 1, 2011 -
XL Insurance June 30, 2012
Coverage
Property
per Occurrence and in the Annual Aggregate in respect of Flood; $ 10,000,000
per Occurrence and in the Annual Aggregate in respect of Earth Movement, 20,000,000
Excluded. per Occurrence and in the Annual Aggregate applicable in
High Hazard Movement zones;
per Occurrence and in the Aggregate in respect Hazardous Substance; 500,000
per Occurrence in respect of Business Interruption; EXCLUDED
per Occurrence in respect of Accounts Receivable; 100,000
per Occurrence in respect of scheduled, direct Contingent Time Element; EXCLUDED
per Occurrence in respect of Incidental Course of Construction; 5,000,000
(or 25.00% of the direct physical loss, whichever greater) per Occurrence in 2,500,000
respect of Debris Removal;
per Occurrence in respect of Demolition and Increased Cost of Construction; 10,000,000
per Occurrence in respect of Electronic Data Processing Media; 1,000,000
per Occurrence in respect of Errors and Omissions; 2,000,000
per Occurrence in respect of Expediting Expense; 1,000,000
per Occurrence in respect of Extra Expense excluding replacement power of 2,000,000
increased cost of generation, transmission and/or distribution of electricity,
water or natural gas;
per Occurrence in respect of Fire Department Service Charges and 500,000
Extinguishing Expenses;
per Occurrence in respect of Newly Acquired Locations (ninety (90) days 1,000,000
reporting);
per Occurrence in respect of property in Course of Inland Transit; 2,500,000
per Occurrence in respect of Miscellaneous Unnamed Locations, except: 500,000
Excluded. per Occurrence in respect of Flood;
Excluded. per Occurrence in respect of Earth Movement;
Excluded. per Occurrence in respect of Named Storm;
per Occurrence in respect of Valuable Papers and Records; 100,000
per Occurrence in respect of Personal Property Temporarily Off Premise. 100,000
Deductibles / Retentions
For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its
own account an initial amount of:
In respect of Damage to Insured Property:
$350,000, Per Occurrence, except;
$100,000, per Occurrence as respect Transit;
In respect of Time Element loss (Extra Expen
45 days per Occurrence except;
72 hours Per Occurrence in respect of Service Interruption
City of Dover, Delaware III-13 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 65
2011 Engineering Consultant’s Report Part III – Financial Assessment
Table III-9
RESERVE ACCOUNT ACTIVITY AND BALANCES
City of Dover, Delaware
Insurance Contingency Electric Rate Bond Depreciation Future
Reserve Reserve Stabilization Reserve Reserve Capacity
Account Account Account Account Account Account
Year Ended June 30, 2009
Balance in Account on July 1 $ 370,802 $ 894,169 $ 2,471,465 $ 3,257,091 $ 4,451,663 $ 8,457,351
Receipts
Interest Earned 14,300 34,484 95,314 252,718 338,327 306,512
Appropriations - - 2,085,748 4,041,632 5,000,000 -
Total Funds Available $ 385,102 $ 928,653 $ 4,652,527 $ 7,551,441 $ 9,789,990 $ 8,763,863
Disbursements
Debt Service Payments - - - (6,046,632) - -
Transfer to Capital Projects - - - - (2,000,000) -
Balance in Account on June 30 $ 385,102 $ 928,653 $ 4,652,527 $ 1,504,809 $ 7,789,990 $ 8,763,863
Year Ended June 30, 2010
Balance in Account on July 1 $ 385,102 $ 928,653 $ 4,652,527 $ 1,504,809 $ 7,789,990 $ 8,763,863
Receipts
Interest Earned 11,428 27,613 123,992 211,615 231,165 260,065
Appropriations - 83,500 - 4,066,610 - -
Total Funds Available $ 396,530 $ 1,039,766 $ 4,776,519 $ 5,783,034 $ 8,021,155 $ 9,023,928
Disbursements
Debt Service Payments - - - (2,445,212) - -
Transfer to Capital Projects - - - - - -
Balance in Account on June 30 $ 396,530 $ 1,039,766 $ 4,776,519 $ 3,337,822 $ 8,021,155 $ 9,023,928
Year Ended June 30, 2011
Balance in Account on July 1 $ 396,530 $ 1,039,766 $ 4,776,519 $ 3,337,822 $ 8,021,155 $ 9,023,928
Receipts
Interest Earned 6,804 17,022 83,648 108,706 141,066 154,843
Appropriations - - 1,300,000 3,588,881 2,250,000 -
Total Funds Available $ 403,334 $ 1,056,788 $ 6,160,167 $ 7,035,409 $ 10,412,221 $ 9,178,771
Disbursements
Debt Service Payments - - - (3,516,027) - -
Transfer to Capital Projects - - - - - -
Balance in Account on June 30 $ 403,334 $ 1,056,788 $ 6,160,167 $ 3,519,382 $ 10,412,221 $ 9,178,771
*****
City of Dover, Delaware III-14 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 66
PART IV – CONCLUSIONS
Page 67
2011 Engineering Consultant’s Report Part IV – Conclusions
PART IV
CONCLUSIONS
In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed assessments
of the electric generating stations and the transmission and distribution system of the City Electric
Division. The investigations included interviews, observations, and reviews of FY 2011 expenditures and
FY 2012 budgets. In addition, an analysis of the balances of the Improvement and Extension Fund and
other funds benefiting the Electric Division was performed. Burns & McDonnell also reviewed the
adequacy of the revenues provided by the current retail rates in relation to the requirements of the City of
Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23,
1985. A high level assessment of the City’s insurance coverage related to the Electric Division was also
completed. Based on these reviews and assessments, it is Burns & McDonnell’s opinion that:
1. The City’s power generation facilities are being operated and maintained consistent with accepted
electric utility practice in the United States.
2. The design, construction, operation, and maintenance of the City's electric transmission and
distribution system and the associated facilities are consistent with current generally accepted electric
utility standards and over the past few years, the system has been upgraded in order to improve
operation and service to customers.
3. The Electric Division capital projects included in the City’s Capital Investment Plan and the FY 2012
Operating Budget are necessary and should provide improved reliability and power quality for the
Electric System.
4. The balances as of June 30, 2011 for the various reserve funds maintained by the City for the Electric
Division appear to be sufficient for their defined purposes.
5. The insurance coverage in full force and affect as maintained by the City related to the various assets
of the Electric Division appears to satisfy the requirements of Section 706 of the Resolution.
6. The electric revenues generated by the City’s current retail rates are more than sufficient to fulfill the
debt service coverage requirement defined in Section 502(c) of the Resolution.
*****
City of Dover, Delaware IV-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Page 68
Burns & McDonnell World Headquarters
9400 Ward Parkway
Kansas City, MO 64114
Phone: 816-333-9400
Fax: 816-333-3690
www.burnsmcd.com
Burns & McDonnell: Making our clients successful for more than 100 years
Page 69
City of Dover, Delaware
Fiscal 2013 DRAFT Capital Investment Plan
FY 13 thru FY 17
PROJECTS BY DEPARTMENT
Department Project# Priority FY 13 FY 14 FY 15 FY 16 FY 17 Total
Wastewater Management
Inflow/Infiltration Removal WW1201 1 1,000,000 1,013,800 1,264,500 1,200,000 1,207,500 5,685,800
SCADA Equipment Technology Upgrade WW1202 2 29,300 29,300
Baltray Pump Station Replacement WW1204 4 100,000 100,000
Dover Brook Gardens Pump Station Upgrade WW1205 5 50,000 50,000
Brandywine Pump Station Replacement WW1206 3 350,000 350,000
McKee Road Pump Station Communator Replacement WW1207 6 45,000 45,000
Hazlettville Road Interceptor WW1301 8 30,000 740,000 770,000
Lakeview Drive Pump Station Replacement WW1302 9 52,000 450,000 502,000
Westover Pump Station and Force Main Upgrade WW1303 7 65,000 703,800 768,800
Garrison Farm Improvements WW1304 3 2,000,000 2,000,000
Retreat Pump Station Replacement WW1401 5 52,000 360,500 412,500
Rolling Acres Pump Station Replacement WW1501 3 52,000 360,500 412,500
Lepore Road Sanitary Sewer Main Upgrade WW1601 3 50,000 275,000 325,000
Delaware Tech Pump Station Replacement WW1602 4 52,000 403,000 455,000
Silver Lake Pump Station Replacement WW1701 4 52,000 52,000
Wastewater Management Total 3,721,300 2,959,600 1,677,000 1,662,500 1,937,500 11,957,900
Water Management
Wellhead Redevelopment Program WD1203 1 70,000 75,000 80,000 82,500 85,000 392,500
Piney Point Well WD1301 4 450,000 450,000
1.0 MG Elevated Water Storage Tower WD1302 5 2,000,000 390,000 2,390,000
Future Columbia Well Installation WD1304 7 55,000 98,800 153,800
Garrison Farm Improvements WD1305 3 2,000,000 2,000,000
Emergency Generators WD1306 4 80,000 80,000
Water Quality Improvements WQ1201 2 479,000 905,000 960,000 950,000 1,600,000 4,894,000
Water Treatment Plant Process Improvements WQ1303 5 150,000 350,000 550,000 1,050,000
Water Management Total 5,134,000 1,520,000 1,390,000 1,582,500 1,783,800 11,410,300
GRAND TOTAL 8,855,300 4,479,600 3,067,000 3,245,000 3,721,300 23,368,200
Monday, May 14, 2012
Page 70
City of Dover, Delaware
Fiscal 2013 DRAFT Capital Investment Plan
FY 13 thru FY 17
FUNDING SOURCE SUMMARY
Source FY 13 FY 14 FY 15 FY 16 FY 17 Total
Bond Proceeds 2,080,000 1,310,000 975,000 4,365,000
Impact Fee Reserve 550,000 1,317,000 165,000 165,000 119,800 2,316,800
Water/Wastewater Fund 6,225,300 3,162,600 1,592,000 2,105,000 3,601,500 16,686,400
GRAND TOTAL 8,855,300 4,479,600 3,067,000 3,245,000 3,721,300 23,368,200
Monday, May 14, 2012
Page 71
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1201
Project Name Inflow/Infiltration Removal
Type Improvement Department Wastewater Management
Useful Life 50 years Contact Public Works Director
Category Water/Wastewater Priority 1
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $8,835,800
This project identifies and corrects areas in the sanitary sewer collection system that are deteriorating and allowing groundwater to enter the
sanitary sewer system through cracked pipes and/or joints. Video investigations of the lines are performed by in-house crews to determine the
condition of subject pipes which may also help with the identification of sump pumps and other illicit connections to the system which will have
to be removed by individual property owners. Investigations are occurring systematically through the sewer basins to establish projects for the
following year. Sanitary sewer lines are also being inspected in conjunction with water quality improvement project areas to determine main
condition. Smoke testing, pipe relining and or replacement are to occur each year.
The wet weather which was experienced in both 2003 and 2009/2010/2011, exemplified the fact that the aging and deteriorating sanitary sewer
system allows groundwater and rain water to enter the system. This in turn results in higher treatment charges from Kent County. In FY 2011 a
new groundwater inflow adjustment charge was established as a result. It is critical to continue making improvements on a regular and planned
basis to improve the integrity of the wastewater system. Weather occurs in a cyclical fashion and discrepancies between fees collected and
charges received will likely happen again when groundwater and precipitation levels rise. Anticipated areas that will be rehabilitated include City
of Dover maintained infrastructure that contributes to the following pump stations; Schoolview, Brandywine, Lafferty Lane and Dover East.
Justification
The wet weather experienced in both 2003 and 2009/2010/2011, highlighted the fact that we have an aging wastewater system that requires more
attention to the condition of the old pipe network and more monitoring of illicit connections to the system. Inflow and infiltration are problems
that all customers pay for since they are costs that are not assigned to an individual customer. Therefore, all customers are affected by expenses
related to inflow and infiltration.
Delaying or eliminating this project will result in continued higher treatment charges for wastewater flow to Kent County than is necessary. In
addition, the reduction in available capacity in the City and county systems due to inflow and infiltration will reduce the capacity available for
future growth.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
1,900,000 Construction/Maintenance 1,000,000 1,013,800 1,264,500 1,200,000 1,207,500 5,685,800 1,250,000
Total Total 1,000,000 1,013,800 1,264,500 1,200,000 1,207,500 5,685,800 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
1,900,000 Water/Wastewater Fund 1,000,000 1,013,800 1,264,500 1,200,000 1,207,500 5,685,800 1,250,000
Total Total 1,000,000 1,013,800 1,264,500 1,200,000 1,207,500 5,685,800 Total
Budget Impact/Other
The project will reduce the operating budget over time due to the reduction in costs for sewage treatment paid to Kent County. All savings are
cumulative.
Monday, May 14, 2012
Page 72
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1202
Project Name SCADA Equipment Technology Upgrade
Type Improvement Department Wastewater Management
Useful Life 10-12 years Contact Public Works Director
Category Water/Wastewater Priority 2
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $196,300
This project involves the replacement of antiquated and/or obsolete remote terminal units (RTUs) at sewage pumping stations with new up-to-
date serviceable SCADA equipment. Microwave radios, antennas, and enclosures would be upgraded as needed. The RTU and radio are the
reporting equipment for the SCADA system (Supervisory Control and Data Acquisition) which reports, on a constant basis, the status of alarms at
the City's pumping stations. The RTUs that are being replaced are outdated and unable to be repaired. Most of the equipment is installed in two
steel cabinets mounted outside and are corroding. The new equipment is installed within a single fiberglass NEMA 4 enclosure.
Each Year: order equipment and construct cabinets and back-plates by December; complete installation by June. Stations being completed in
Fiscal 2013: University South, Maureen and Nottingham.
Justification
Replace failing antiquated equipment with completely new alarm reporting equipment to provide reliable SCADA system reporting and to
prevent the need for costly non budgeted emergency repairs.
Lack of alarms resulting in costly sewer backup claims. An RTU or radio failure would provide no advance warning of a failure and could result
in costly sewer backup claims or sewage overflows into waterways. Equipment would become old, not supported, and obsolete. This an ongoing
project that started in Fiscal 2008 and will be continued in Fiscal 2013.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
167,000 Miscellaneous 29,300 29,300
Total Total 29,300 29,300
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
167,000 Water/Wastewater Fund 29,300 29,300
Total Total 29,300 29,300
Budget Impact/Other
Monday, May 14, 2012
Page 73
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1204
Project Name Baltray Pump Station Replacement
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 4
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $125,000
The proposed project includes the in kind replacement of the grinder pumping station installed with the construction of the Baltray Subdivision in
1988. The station is approaching its anticipated life expectancy of 20-25 years. The grinder pumps, rail system, and electric controls and
comminutor will be replaced.
Grinder pumps require periodic repairs and replacement to maintain efficient operation. During previous pump removal, staff has noticed leaking
seals and instability in the rail system for the pumps due to corrosion. Although grinder pumps are less costly than standard pumps used
elsewhere, they are only appropriate under certain conditions. As a grinder pump is still effective at this location, it will be replaced in kind.
Justification
Replace the aging station with new components to prevent the need for costly non budgeted repairs to maintain operation.
Pump failure resulting in a sewage spill into waterways or backup in a residence. Because of the age of the pump station, certain parts are no
longer obtainable, and replacement of equipment is costly.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
25,000 Construction/Maintenance 100,000 100,000
Total Total 100,000 100,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
25,000 Water/Wastewater Fund 100,000 100,000
Total Total 100,000 100,000
Budget Impact/Other
Monday, May 14, 2012
Page 74
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1205
Project Name Dover Brook Gardens Pump Station Upgrade
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 5
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $65,000
This project would construct a force main priming loop to insure that adequate back pressure is provided to the check valves to maintain prime on
the vacuum primed Smith & Loveless pumps and upgrade to maintain or increase capacity, which may be accomplished by installing new pumps.
The loop is to create a high point in the force main above the pumps to provide a column of water against the check valves. The existing force
main was originally installed with a constant slope away from the station to the receiving gravity sewer manhole. The force main drains by gravity
away from the check valves providing very little static water pressure to hold check valves closed.
Staff has observed numerous high wet well alarms due to pump loss of prime. Construction to be provided by in-house crew.
Justification
Reduce maintenance time of cleaning check valves weekly and on-call or overtime pay when the pumps lose prime.
Pump prime failure could result in a sewage spill into waterways or backup in a residence.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
15,000 Construction/Maintenance 50,000 50,000
Total Total 50,000 50,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
15,000 Water/Wastewater Fund 50,000 50,000
Total Total 50,000 50,000
Budget Impact/Other
Monday, May 14, 2012
Page 75
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1206
Project Name Brandywine Pump Station Replacement
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 3
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $402,000
The proposed project includes the replacement of the Smith & Loveless package pumping station installed in 1977. The station has exceeded its
life anticipated expectancy of 20-25 years and is in need of a capacity upgrade due to the increased growth in the basin.
This station was installed for the Dover Country Club Apartments when City sewer was made available to this area. The site was previously
outside the City's service area and had its own onsite sewer treatment system. Over the life span of this station, it has seen increased flows with
the construction of Mallard Pond, Marsh Creek, and Westwind Meadows, and the extension of service to Fox Hall Drive and possible infiltration.
Based on the monthly runtime hours, the station is currently operating at 130 percent of desired capacity. Staff has observed numerous pump
clogs and failures in the past years. The Dover Country Club and Brandywine Condo sewer lines are old and possibly influenced by infiltration.
Justification
Replace the aged station with a completely new station to prevent the need for costly non budgeted repairs to maintain operation.
Pump failure resulting in a sewage spill into waterways or backup in a residence. Because of the age of the pump station, certain parts are no
longer obtainable, and replacement of equipment is costly.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
52,000 Construction/Maintenance 350,000 350,000
Total Total 350,000 350,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
52,000 Impact Fee Reserve 211,000 211,000
Total Water/Wastewater Fund 139,000 139,000
Total 350,000 350,000
Budget Impact/Other
Monday, May 14, 2012
Page 76
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1207
Project Name McKee Road Pump Station Communator Replacement
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 6 --
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $55,000
The proposed project includes the replacement of the comminutor at the influent line to the pumping station installed in 1995. This acts as a
screen/grinder at the influent side of the station, cutting or stopping large debris from entering the wet well and clogging the pumps. The
comminutor motor has run 24/7 since the initial startup of the pumping station.
Justification
Replace the aging equipment to prevent the need for costly unbudgeted repairs to maintain operation.
Unbudgeted costly repairs to comminutor and damage to a pump when failure occurs. Pump failure resulting in a sewage spill into waterway or
backup in a residence. Due to the age of the station, certain parts are no longer obtainable, and replacement of equipment is costly.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
10,000 Construction/Maintenance 45,000 45,000
Total Total 45,000 45,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
10,000 Water/Wastewater Fund 45,000 45,000
Total Total 45,000 45,000
Budget Impact/Other
Monday, May 14, 2012
Page 77
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1301
Project Name Hazlettville Road Interceptor
Type Improvement Department Wastewater Management
Useful Life 90+ years Contact Public Works Director
Category Water/Wastewater Priority 8 --
New Project: No Account Number: 417-6900-569.40-35
Time-Line:
Description Total Project Cost: $770,000
This project, identified in the 2009 Wastewater Master Plan, identified sections of 15" gravity wastewater main as being overloaded in peak
conditions, due to a negative slope in the pipe. This project calls for the upgrade of roughly 1,320 linear feet of wastewater main. The proposed
upgrade will install 21" main at proper slope to provide adequate capacity and allow for future growth in the basin.
Justification
This project has been identified by the 2009 Wastewater Master Plan that the section of pipes is flowing nearly full, due to negative slope. This
project will allow for proper capacity to handle current flow as well to allow for growth.
Delaying or eliminating this project would result in overflow of wastewater material.
In-house design in Fiscal 2013; construction in Fiscal 2014.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 30,000 30,000
Construction/Maintenance 740,000 740,000
Total 30,000 740,000 770,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Impact Fee Reserve 24,000 592,000 616,000
Water/Wastewater Fund 6,000 148,000 154,000
Total 30,000 740,000 770,000
Budget Impact/Other
Monday, May 14, 2012
Page 78
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1302
Project Name Lakeview Drive Pump Station Replacement
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 9 --
New Project: No Account Number: TBD
Time-Line:
Description Total Project Cost: $502,000
This project calls for replacement of the Smith & Loveless package pumping station installed in 1971. The station has exceeded its life
anticipated expectancy of 20-25 years and is need of a capacity upgrade due to high peak inflow rates.
This station is located within the roadway of Lakeview Drive. The design portion of this project is to address the relocation of this station.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation.
Pump failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer
obtainable and replacement of equipment is costly.
Design and bid in Fiscal 2013; construction in Fiscal 2014.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 52,000 52,000
Construction/Maintenance 450,000 450,000
Total 52,000 450,000 502,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Water/Wastewater Fund 52,000 450,000 502,000
Total 52,000 450,000 502,000
Budget Impact/Other
Monday, May 14, 2012
Page 79
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1303
Project Name Westover Pump Station and Force Main Upgrade
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 7 --
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $768,800
The proposed project includes the upgrade of the Smith & Loveless pumping station and force main installed in 1994. The pump station's
available capacity will be consumed with the build out of the Village of Cannon Mills and will be in need of additional capacity in order to be
able receive additional flow from the west, specifically, the new Dover High School. The project will include replacement of interior six-inch
suction and discharge piping with eight-inch pipe and upgrade 1,400 feet of six-inch force main to 12-inch diameter pipe from the station to
Electric Avenue.
Justification
Provide adequate capacity to receive additional sewage flow from the immediate vicinity due to development and annexation.
Pump failure resulting in a sewage spill into waterways or backup in a residence.
Design and bid in Fiscal 2013; construction in Fiscal 2014.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 65,000 65,000
Construction/Maintenance 703,800 703,800
Total 65,000 703,800 768,800
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Impact Fee Reserve 65,000 703,800 768,800
Total 65,000 703,800 768,800
Budget Impact/Other
Monday, May 14, 2012
Page 80
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1304
Project Name Garrison Farm Improvements
Type Improvement Department Wastewater Management
Useful Life Unknown Contact Public Works Director
Category Water/Wastewater Priority 3
New Project: Account Number:
Time-Line:
Description Total Project Cost: $2,000,000
Justification
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 1,828,000 1,828,000
Other 172,000 172,000
Total 2,000,000 2,000,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Bond Proceeds 2,000,000 2,000,000
Total 2,000,000 2,000,000
Budget Impact/Other
Monday, May 14, 2012
Page 81
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1401
Project Name Retreat Pump Station Replacement
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 5
New Project: No Account Number: TBD
Time-Line:
Description Total Project Cost: $412,500
The proposed project includes the replacement of the Smith & Loveless package pumping station installed in 1978. The station has exceeded its
life expectancy of 20-25 years and is in need of a capacity upgrade due to the increased growth in the basin, specifically the proposed
development at the Maple Dale Country Club, which had provided a cash-in-lieu contribution for upgrading the station proportional to the
amount of flow they will be contributing to the pump station.
Justification
Replace the aged station with a completely new station to prevent the need for costly non budgeted repairs to maintain operation.
Pump failure resulting in a sewage spill into waterways or backup in a residence. Because of the age of the pump station, certain parts are no
longer obtainable and replacement of equipment is costly. Design in Fiscal 2014; construction in Fiscal 2015.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 52,000 52,000
Construction/Maintenance 360,500 360,500
Total 52,000 360,500 412,500
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Impact Fee Reserve 20,800 144,200 165,000
Water/Wastewater Fund 31,200 216,300 247,500
Total 52,000 360,500 412,500
Budget Impact/Other
Monday, May 14, 2012
Page 82
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1501
Project Name Rolling Acres Pump Station Replacement
Type Improvement Department Wastewater Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 3
New Project: No Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $412,500
This project calls for replacement of the Smith & Loveless package pumping station installed in 1973 in order to handle the commercial areas
from Harrington Realty Shopping Center to the Howard Johnson Hotel. The station has exceeded its life anticipated expectancy of 20-25 years
and is in need of a capacity upgrade due to the high peak inflow rates.
This station experiences periods of high inflow rates due to the hotel occupancy and is susceptible to possible inflow/infiltration. Staff has
observed numerous pump high wet well alarms due to high inflows and increased runtimes during wet months.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation.
Pump failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer
obtainable, and replacement of equipment is costly. Design and bid in Fiscal 2015; construction in Fiscal 2016.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 52,000 52,000
Construction/Maintenance 360,500 360,500
Total 52,000 360,500 412,500
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Impact Fee Reserve 20,800 144,200 165,000
Water/Wastewater Fund 31,200 216,300 247,500
Total 52,000 360,500 412,500
Budget Impact/Other
Monday, May 14, 2012
Page 83
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1601
Project Name Lepore Road Sanitary Sewer Main Upgrade
Type Improvement Department Wastewater Management
Useful Life 90+ years Contact Public Works Director
Category Water/Wastewater Priority 3
New Project: Yes Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $325,000
This project calls for the replacement of approximately 374 linear feet of 8 inch gravity sewer main. Currently, the sewer main operates in a
reverse slope condition, which overloads the pipe. The proposed upgrade will provide slope and adequate capacity for current flow to be carried
to discharge.
Justification
This project will allow for proper capacity and slope to handle the current flow.
Delaying or eliminating this project could result in overflow of wastewater material.
Design and bid in Fiscal 2016; construction in Fiscal 2017.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 50,000 50,000
Construction/Maintenance 275,000 275,000
Total 50,000 275,000 325,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Impact Fee Reserve 20,800 21,000 41,800
Water/Wastewater Fund 29,200 254,000 283,200
Total 50,000 275,000 325,000
Budget Impact/Other
Monday, May 14, 2012
Page 84
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1602
Project Name Delaware Tech Pump Station Replacement
Type Improvement Department Wastewater Management
Useful Life Unknown Contact Public Works Director
Category Water/Wastewater Priority 4
New Project: Yes Account Number: 417-6900-569.40-31
Time-Line:
Description Total Project Cost: $455,000
This project calls for replacement of the Smith & Loveless package pumping station installed in 1975 in order to handle the increased flows from
the area. The station has exceeded its life anticipated expectancy of 20-25 years and is in need of a capacity upgrade due to anticipated increase
flow.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation.
Pump failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer
obtainable, and replacement of equipment is costly. Design and bid in Fiscal 2016; construction in Fiscal 2017.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 52,000 52,000
Construction/Maintenance 403,000 403,000
Total 52,000 403,000 455,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Water/Wastewater Fund 52,000 403,000 455,000
Total 52,000 403,000 455,000
Budget Impact/Other
Monday, May 14, 2012
Page 85
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WW1701
Project Name Silver Lake Pump Station Replacement
Type Improvement Department Wastewater Management
Useful Life Unknown Contact Public Works Director
Category Water/Wastewater Priority 4
New Project: Yes Account Number: 147-6900-569.40-31
Time-Line:
Description Total Project Cost: $427,000
This project calls for replacement of the Smith & Loveless package pumping station installed in 1982 in order to handle development in the area,
as well as completely rehabilitate the wet well side of the pump station using the poly-triplex system liner. The station has exceeded its life
expectancy of 20-25 years and is in need of a capacity upgrade to handle anticipated growth in the basin.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation. The wet well has
deteriorated due to age and is subject to groundwater infiltration. Pump failure resulting in a sewage spill into waterways or backup in a
residence. Because of the age of the pump station, certain parts are no longer obtainable and replacement of equipment is costly. Design and bid
in Fiscal 2017; construction in Fiscal 2018.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Planning/Design 52,000 52,000 375,000
Total 52,000 52,000 Total
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Water/Wastewater Fund 52,000 52,000 375,000
Total 52,000 52,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 86
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WD1203
Project Name Wellhead Redevelopment Program
Type Improvement Department Water Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 1
New Project: No Account Number: 417-6800-568.40-34
Time-Line:
Description Total Project Cost: $940,962
This project will provide for rehabilitation and repair of each deep wellhead in an effort to maintain operations and/or increase/maintain the yield
of each well as it relates to the permitted allocation.
FY 2008; total well inspection and testing performed. FY 2009: Motors at Wells #6A and #9 were rebuilt, and wells #13R and #15 were
redeveloped. FY 2010: Well #10. FY 2011: Well #4 redevelopment and well piping improvements at various well locations, as well as
continued well testing. FY 2012: Well #1 redevelopment. FY2013: Work will be determined following the testing in FY2012.
Justification
The well screening and gravel pack requires cleaning over time due to a buildup of mineral deposits and foreign materials such as clay and silt.
This maintenance effort is critical to ensure that production can continue to meet demand. It is also necessary to maintain the operational aspects
of each well and provide repairs as needed to minimize downtime to maintain system capacity.
Delaying or eliminating this project would result in the continued deterioration of the well screen, gravel pack, and well yield over time. It would
also result in increased well downtime, emergency repairs, and decreased capacity. These issues can lead to increased flow pattern changes and
water quality concerns.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
460,962 Construction/Maintenance 70,000 75,000 80,000 82,500 85,000 392,500 87,500
Total Total 70,000 75,000 80,000 82,500 85,000 392,500 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
460,962 Water/Wastewater Fund 70,000 75,000 80,000 82,500 85,000 392,500 87,500
Total Total 70,000 75,000 80,000 82,500 85,000 392,500 Total
Budget Impact/Other
Monday, May 14, 2012
Page 87
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WD1301
Project Name Piney Point Well
Type Improvement Department Water Management
Useful Life 50 years Contact Public Utilities Director
Category Water/Wastewater Priority 4
New Project: No Account Number: 417-6800-568.40-31
Time-Line:
Description Total Project Cost: $645,000
This project, identified by staff and confirmed by the 2006 Water Master Plan Update, proposes the drilling of a new Piney Point Aquifer
Production Well to increase production capacity up to our current permitted allocation as well as increase system pressure and stabilize the
chlorine residuals of the City. The proposed wellhead is planned to be located in Schutte Park. It is intended that the yield from a new
production well will allow us to abandon one of our poorly performing wells.
Planning started in Fiscal 2009. Design continued between 2010 and 2012. Construction to be completed in Fiscal 2013.
Justification
A reduction in long-term yield from our Piney Point Well is causing a greater reliance on our more costly aquifers.
Delaying or eliminating this project would result in the continued reduction in our production capabilities under our permitted allocation, as well
as our ability to meet projected demand increases.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
195,000 Construction/Maintenance 450,000 450,000
Total Total 450,000 450,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
195,000 Impact Fee Reserve 250,000 250,000
Total Water/Wastewater Fund 200,000 200,000
Total 450,000 450,000
Budget Impact/Other
Monday, May 14, 2012
Page 88
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WD1302
Project Name 1.0 MG Elevated Water Storage Tower
Type Improvement Department Water Management
Useful Life 90+ years Contact Public Works Director
Category Water/Wastewater Priority 5
New Project: No Account Number: 417-6800-568.40-31
Time-Line:
Description Total Project Cost: $3,085,000
The proposed project, identified by staff and confirmed by the 2006 Water Master Plan Update, will construct a new 1.0 million gallon elevated
storage tank within the distribution system.
The planning, site selection and land acquisition was conducted between Fiscal 2009 and Fiscal 2012. For bonding purposes, the construction of
the tank has been divided between two fiscal years. Construction is planeed for Fiscal 2013 and 2014.
Justification
This project was determined necessary by the 2006 Water Mater Plan Update in order to meet future storage volume requirements based upon
demands and to aid in reducing low pressure areas and enhance fire suppression capability.
Delaying or eliminating this project will result in preventing growth within the system, particularly; fire suppression measures will be
compromised.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
695,000 Construction/Maintenance 2,000,000 390,000 2,390,000
Total Total 2,000,000 390,000 2,390,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
695,000 Water/Wastewater Fund 2,000,000 390,000 2,390,000
Total Total 2,000,000 390,000 2,390,000
Budget Impact/Other
Monday, May 14, 2012
Page 89
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WD1304
Project Name Future Columbia Well Installation
Type Improvement Department Water Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 7 --
New Project: No Account Number: 417-6800-568.40-31
Time-Line:
Description Total Project Cost: $562,700
This project, identified by staff and confirmed by the 2006 Water Master Plan Update, proposes the drilling of new shallow well to increase
production capacity at the Water Treatment Plant to design levels of 5.0 million gallons per Day. This project is to be completed in conjunction
with the Water Treatment Plant Process Improvements.
The specific location of a proposed wellhead has not been determined at this time. The location will be selected in the planning and design phase.
In addition, the yield from a new production well may allow us to abandon some of our poorly performing wells. Land costs are based upon the
need of 1/4 acre of land for the project. This project will be designed in Fiscal 2013 to coincide with the Water Treatment Plant Process
Improvements Design, Construction is planned for Fiscal 2018.
Justification
To meet increased water demand and fire suppression requirements.
Delaying or eliminating this project would result in the continued reduction in our production capabilities under our permitted allocation, as well
as limiting the City’s growth.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Planning/Design 55,000 48,800 103,800 408,900
Land Acquisition 50,000 50,000
Total
Total 55,000 98,800 153,800
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Impact Fee Reserve 98,800 98,800 408,900
Water/Wastewater Fund 55,000 55,000
Total
Total 55,000 98,800 153,800
Budget Impact/Other
Monday, May 14, 2012
Page 90
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WD1305
Project Name Garrison Farm Improvements
Type Improvement Department Water Management
Useful Life Unknown Contact Public Works Director
Category Water/Wastewater Priority 3
New Project: Account Number:
Time-Line:
Description Total Project Cost: $2,000,000
Justification
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 1,828,000 1,828,000
Other 172,000 172,000
Total 2,000,000 2,000,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Water/Wastewater Fund 2,000,000 2,000,000
Total 2,000,000 2,000,000
Budget Impact/Other
Monday, May 14, 2012
Page 91
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WD1306
Project Name Emergency Generators
Type Improvement Department Water Management
Useful Life Unknown Contact Public Utilities Director
Category Water/Wastewater Priority 4
New Project: Account Number:
Time-Line:
Description Total Project Cost: $80,000
This project, identified in the 2006 Water Master Plan Update, would provide emergency generators for large production wells. Due to the
inability of obtaining a homeland security grant, staff will pursue a partial grant from the Drinking Water State Revolving Fund (DWSRF).
All generators purchased will be permanent fixtures at each site. Generator purchased in FY 2012 will support Well #2, FY 2013 will support
Well #6 and FY 2014 will support Well #10. Currently, a portable generator is stationed at Well #10, after installation of permanent generator at
Well #10; the portable generator will be used at medium sized production wells as needed.
Justification
This project will provide emergency power to wells for continued water production and reliability in the event of power disruptions or other
emergencies.
Delaying or eliminating this project would result in reduced or suspended water service in the event of power disruptions or other emergencies.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Equip/Vehicle/Furnishings 80,000 80,000
Total 80,000 80,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Bond Proceeds 80,000 80,000
Total 80,000 80,000
Budget Impact/Other
Monday, May 14, 2012
Page 92
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WQ1201
Project Name Water Quality Improvements
Type Improvement Department Water Management
Useful Life 90+ years Contact Public Works Director
Category Water/Wastewater Priority 2
New Project: No Account Number: 417-6800-568.40-31
Time-Line:
Description Total Project Cost: $6,994,000
This project was first identified by staff and the 2006 Water Master Plan Update, and has since become further refined with the FY 2006 Water
Quality Evaluation. Projects to be included under this category primarily consist of replacement or relining of old unlined cast iron water main
within the City’s water distribution system; system upgrades to improve system control; and utilization of a consultant to provide additional
design and evaluation services, as needed. Recent research and data collection has produced a Water Main Rehabilitation Priority List, based on
several criteria to identify water mains that are in need of replacement or relining. Pipes will be upgraded according to the severity of the pipe
condition, as well as coordination with the City of Dover’s Public Services Street Rehabilitation Program. Timeline/Current Status:between FY
2008 and FY 2010, the deep well contact chambers were designed and installed. Between FY 2008 and FY 2011 the water mains that were
replaced include, Washington Street, Pennsylvania Avenue, South Street, Pear Street, West Street, Hazel Road, Maryland Avenue, American
Avenue, Bayard Avenue, Greenhill Avenue, Bayard Avenue Alley and Loockerman Street. Operational efforts, such as flushing, will continue to
occur on a routine basis. FY 2012 improvements include, N. Pennsylvania Ave., American Ave. Ext., Madison St., Rodney Rd., New Street,
Ross Street and Bradford Street (near Wesley College). As part of the Water Main Rehabilitation Priority List, water lines were identified
throught the City that require replacing/relining. The following water line rehab projects are scheduled for FY2013: William Street, West Street &
Alley. As part of the Water Main Rehabilitation Priority List, water lines were identified throughout the City that requires replacement/relining.
Using this as a guide the following water line rehabilitation projects are scheduled for FY 2013: William Street, West Street West Alley and West
Street East Alley.
Justification
Water quality complaints have eroded consumer confidence in the City’s water supply as the water is perceived to be aesthetically unpleasant. In
order to reduce complaints and potentially alleviate this problem, it is necessary to implement the improvements identified by staff, the 2006
Water Master Plan Update, and the FY 2006 Water Quality Evaluation.
Delaying or eliminating this project will prolong customer dissatisfaction and further erode confidence in the City’s water supply. In addition,
main rehabilitation and replacement, ensuring pipes do not significantly exceed the expected life cycle, is critical to provide a reliable supply of
water for our customers and for fire suppression. Water leaks and breaks on older lines can have a significant impact on our ability to serve over
time.
Addressing the brown water and associated water quality concerns of the City’s water system will not only require capital improvements to the
system but also operational changes. Some operation changes will result in no net effect on the operating budget, while others will need to be
addressed in the development of future operating budgets. Such items include tools and supplies necessary to improve system sampling and
monitoring as well as tools and supplies necessary to improve system-wide flushing operations.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
500,000 Construction/Maintenance 479,000 905,000 960,000 950,000 1,600,000 4,894,000 1,600,000
Total Total 479,000 905,000 960,000 950,000 1,600,000 4,894,000 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
500,000 Bond Proceeds 960,000 950,000 1,910,000 1,600,000
Total Water/Wastewater Fund 479,000 905,000 1,600,000 2,984,000
Total
Total 479,000 905,000 960,000 950,000 1,600,000 4,894,000
Budget Impact/Other
Monday, May 14, 2012
Page 93
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # WQ1303
Project Name Water Treatment Plant Process Improvements
Type Improvement Department Water Management
Useful Life 20-25 years Contact Public Works Director
Category Water/Wastewater Priority 5
New Project: No Account Number: TBD
Time-Line:
Description Total Project Cost: $1,050,000
This project, identified in the 2006 Water Master Plan Update, proposes process improvements to the existing Water Treatment Plant. Due to
limitations with the Ozone Contactors, the capacity at the Water Treatment Plant is limited to 4.0 million gallons per day, as opposed to 5.0
million gallons per day, as originally designed. A consultant will be utilized to determine the best means and improvements necessary to increase
the capacity. This project is to be performed in conjunction with the future Columbia Well installation.
Planning is proposed for Fiscal 2013. Construction to begin in Fiscal 2015.
Justification
Process improvements will allow for capacity enhancements as well as improved ability to meet regulatory requirements.
Delaying or eliminating this project can result in production capacity decreases, which could limit growth, and/or cause regulatory incompliance.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 150,000 150,000
Construction/Maintenance 350,000 550,000 900,000
Total 150,000 350,000 550,000 1,050,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Bond Proceeds 350,000 25,000 375,000
Water/Wastewater Fund 150,000 525,000 675,000
Total 150,000 350,000 550,000 1,050,000
Budget Impact/Other
Monday, May 14, 2012
Page 95
City of Dover, Delaware
Fiscal 2013 DRAFT Capital Investment Plan
FY 13 thru FY 17
PROJECTS BY DEPARTMENT
Department Project# Priority FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric Engineering
Distribution Upgrades EE1200 1 400,000 400,000 400,000 400,000 400,000 2,000,000
Lighting Project and Rehabilitation EE1202 4 100,000 50,000 50,000 50,000 50,000 300,000
Frazier Substation Reliability Upgrade EE1205 9 610,200 610,200
Distribution Feeder Replacement Program EE1206 8 277,500 277,510 120,510 277,510 277,510 1,230,540
Distribution Capacitors and Controls EE1207 10 125,000 60,000 50,000 50,000 50,000 335,000
Transmission Line Maintenance Program EE1208 7 75,000 75,000 75,000 75,000 75,000 375,000
SCADA Master Hardware Replacement EE1209 6 75,000 75,000
69 kV Substation Switch Replacement EE1301 n/a 55,000 80,000 135,000
Horsepond Substation Reliability Upgrade EE1302 n/a 170,000 591,812 761,812
Division Street Substation Fence EE1304 n/a 70,000 70,000
General Scott Switchgear EE1400 n/a 50,000 800,000 300,000 1,150,000
Horsepond to Cartanza 69 kV Rebuild EE1500 n/a 330,467 330,467
69 kV Cable Replacement North Street EE1502 n/a 85,000 480,710 565,710
System Operations Monitoring EE1503 n/a 30,000 30,000
College Road to McKee Substation Feeders EE1504 n/a 307,000 307,000
McKee Run Yard Rebuild EE1600 n/a 450,000 700,000 1,150,000
Electric Engineering Total 1,932,700 2,334,322 1,747,977 1,783,220 1,627,510 9,425,729
Electric T & D
New Developments EE1212 1 450,000 450,000 450,000 450,000 450,000 2,250,000
Electric T & D Total 450,000 450,000 450,000 450,000 450,000 2,250,000
Power Plant
Units 1 & 2 Cooling Tower Repairs EG1102 8 37,300 37,300
McKee Run Unit 3 Boiler Systems EG1202 2 129,000 144,000 344,000 617,000
McKee Run Unit 3 Auxillary System Components EG1203 4 55,000 188,500 45,000 6,000 34,000 328,500
Van Sant Unit 11 Component Replacements EG1207 4 75,000 75,000 143,000 78,000 371,000
McKee Run & VanSant Preservation of Structures EG1209 n/a 42,000 165,000 142,000 349,000
McKee Run Unit 3 Turbine Repairs EG1212 1 115,000 1,031,000 10,000 1,156,000
McKee Run Units 1 & 2 Component Repairs EG1304 4 52,000 100,000 44,000 172,000 234,000 602,000
McKee Run Turbine Level Window Modification EG1306 6 85,000 85,000
McKee Run Unit 3 Air Heater Expansion Joint EG1307 7 80,000 80,000
McKee Run Unit 3 Stack Repairs EG1309 9 27,000 50,000 77,000
McKee Run Units 1 & 2 Stack Repairs EG1310 10 75,000 75,000
Van Sant Capacity Increase EG1311 n/a 550,000 550,000
McKee Run Unit 3 Generator Repairs EG1312 1 236,000 236,000
Units 1 & 2 Boiler Repairs EG1401 2 18,000 20,000 29,000 67,000
Unit 3 Cooling Tower Repairs EG1402 1 571,000 52,000 138,000 761,000
Unit 3 Cooling Water Line Repairs EG1403 n/a 240,000 240,000
McKee Run High Energy Piping Repairs EG1406 1 80,000 80,000
Metering System Upgrades EG1407 6 25,000 125,000 150,000
McKee Run Building Equipment Replacement EG1601 n/a 110,000 50,000 160,000
Van Sant Unit 11 Major Overhaul/Inspection EG1701 3 900,000 900,000
Monday, May 14, 2012
Page 96
Department Project# Priority FY 13 FY 14 FY 15 FY 16 FY 17 Total
Power Plant Total 1,441,300 1,849,500 1,024,000 677,000 1,930,000 6,921,800
GRAND TOTAL 3,824,000 4,633,822 3,221,977 2,910,220 4,007,510 18,597,529
Monday, May 14, 2012
Page 97
City of Dover, Delaware
Fiscal 2013 DRAFT Capital Investment Plan
FY 13 thru FY 17
FUNDING SOURCE SUMMARY
Source FY 13 FY 14 FY 15 FY 16 FY 17 Total
Depreciation Reserve 250,000 250,000 250,000 750,000
Electric I & E Fund 3,274,000 4,383,822 2,971,977 2,660,220 4,007,510 17,297,529
Future Capacity Reserve Fund 550,000 550,000
GRAND TOTAL 3,824,000 4,633,822 3,221,977 2,910,220 4,007,510 18,597,529
Monday, May 14, 2012
Page 98
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1200
Project Name Distribution Upgrades
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority 1
New Project: No Account Number: 487-8300-563.90-25
Time-Line:
Description Total Project Cost: $4,554,000
This project involves the systemic replacement of overhead lines with underground lines whenever services are being moved, wire is damaged,
trees cause a high number of outages, or development is in progress, and when it is beneficial to the Utility to convert to underground. This can
involve a single line section or an entire residential neighborhood. Annual outage records are reviewed and selected areas are scheduled for
upgrade to underground service. Additionally, this program funds the replacement of existing underground conductors and equipment that have
reached their useful life and have started failing and require replacement.
This account is used to upgrade any trouble areas during the year. The following developments are to be upgraded in FY2013: Capitol Park,
Dover East, and Morris Estates II.
Justification
The number of storm and tree-related outages have been greatly reduced under this program and further improvements can be made to insure the
most reliable electric service possible. Reliability has become one of most important factors to electric customers, second only to safety. The
utility has responded by attempting to provide the most reliable system possible. Underground cable replacements are necessary as the useful,
reliable, life of the original underground cable was 20-30 years. By proactively replacing this cable we will minimize outages and improve
system reliability. In addition to cable replacement, overhead lines are replaced with underground to minimize outages caused by tree growth or
animal contact. Lastly, overhead lines that have reached the end of their useful life are replaced with underground instead of rebuilding the
overhead.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Continued outages lead to increased complaints from our customers
and will lead to customer dissatisfaction. There will be increased costs for repairs made under outage conditions as well as loss of electric
revenue.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 400,000 400,000 400,000 400,000 400,000 2,000,000
Total 400,000 400,000 400,000 400,000 400,000 2,000,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Depreciation Reserve 250,000 250,000 250,000 750,000
Electric I & E Fund 400,000 150,000 150,000 150,000 400,000 1,250,000
Total 400,000 400,000 400,000 400,000 400,000 2,000,000
Budget Impact/Other
Monday, May 14, 2012
Page 99
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1202
Project Name Lighting Project and Rehabilitation
Type Maintenance Department Electric Engineering
Useful Life 10-12 years Contact Electric Director
Category Electric Priority 4
New Project: No Account Number: 487-8300-563.50-76
Time-Line:
Description Total Project Cost: $750,000
This fund was developed to replace and repair existing street lights or install new lights upon customer request.
COMMENTS: This fund will remain active as long as there are improvements to be made. Private area lighting requests are a source of revenue
for the City. Areas completed are White Oak Apartments, Westfield, Fairview, Cranberry Run, Millcreek, Independence Village and Governors
Avenue (South 100 Block), Deerfield, Central Middle School, Fox Hall, Hidden Oaks, a portion of North Governors Ave, The Meadows,
Turnberry, Baltray, and Bicentennial. Areas to be completed this budget year include Old Mill Acres, Overlook, Fox Hall West, and Woodcrest.
$50,000 was added to FY2013 to include lights on the north bound side of Route 13.
Justification
The Electric Division receives numerous requests for lighting improvements. These requests are due to the lights aging, and as they age they put
out less light and become unreliable. There are many developments that are in need of street light improvements. This fund would also provide
funding for new private security light requests.
ONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Constant complaints of poor street lighting and multiple failures due
to antiquated lights.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
450,000 Construction/Maintenance 100,000 50,000 50,000 50,000 50,000 300,000
Total Total 100,000 50,000 50,000 50,000 50,000 300,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
450,000 Electric I & E Fund 100,000 50,000 50,000 50,000 50,000 300,000
Total Total 100,000 50,000 50,000 50,000 50,000 300,000
Budget Impact/Other
Monday, May 14, 2012
Page 100
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1205
Project Name Frazier Substation Reliability Upgrade
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority 9 --
New Project: No Account Number: 487-8300-563.70-27
Time-Line:
Description Total Project Cost: $765,200
The high side of the substation will be upgraded to include transmission line protection breakers as well as the transformer breaker.
TIME-LINE/CURRENT STATUS: The design began in July 2011; materials will be ordered in July 2012 and construction to be completed by
February 2013.
COMMENTS: The completion date is dependent on material lead times, such as steel. Winter weather could also be a factor, if the above lead
times cause a late fall start.
Justification
When the transmission line experiences a fault this substation loses power until the short circuit is found and the appropriate switching is
accomplished. With the installation of the two new line breakers the faulted transmission line will be isolated from the substation and the
customers will not experience an interruption of service.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Accepting the outages in the northwest section of the system during
transmission line faults.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
155,000 Construction/Maintenance 610,200 610,200
Total Total 610,200 610,200
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
155,000 Electric I & E Fund 610,200 610,200
Total Total 610,200 610,200
Budget Impact/Other
Monday, May 14, 2012
Page 101
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1206
Project Name Distribution Feeder Replacement Program
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority 8 --
New Project: No Account Number: 487-8300-563.90-25
Time-Line:
Description Total Project Cost: $1,608,050
Substation feeders are defined as the three-phase lines that carry the load from the substations to the customers’ neighborhood. They
interconnect to other substations to provide load redundancy should there be a failure of an adjacent substation. Many of the older substation
feeders have smaller conductors that cannot carry the load that is required during system peaks and emergency situations. This project would
systematically upgrade these conductors to increase the capacity of the feeders as well as ultimately reducing system losses. Lastly, many of the
feeder components have reached the end of their useful life and require substantial maintenance.
COMMENTS: The average cost to run one mile of underground equates to $135,400 per mile; the average cost to run one mile of overhead
equates to $21,342. It is the departments’ goal to run two miles of underground and five miles of overhead per year. The project began by
increasing the capacity from College Road Substation to General Scott Substation. Feeders to be upgraded in FY13 include sections of Route 9
and Persimmon Tree Road.
Justification
These lines are typically older, smaller, and are reaching the end of their life. This program will provide the needed systematic maintenance to the
conductors, cross arms, switches, insulators, and related components as well as increasing system capacity hence resulting in more efficient
operations by reducing line losses.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Due to the age and condition of the current feeders, delaying this
systematic maintenance/upgrade program will result in reduced system utilization as well as detrimentally impacting future reliability.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
377,510 Construction/Maintenance 277,500 277,510 120,510 277,510 277,510 1,230,540
Total Total 277,500 277,510 120,510 277,510 277,510 1,230,540
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
377,510 Electric I & E Fund 277,500 277,510 120,510 277,510 277,510 1,230,540
Total Total 277,500 277,510 120,510 277,510 277,510 1,230,540
Budget Impact/Other
Monday, May 14, 2012
Page 102
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1207
Project Name Distribution Capacitors and Controls
Type Improvement Department Electric Engineering
Useful Life 15-20 years Contact Electric Director
Category Electric Priority 10 --
New Project: No Account Number: 480-8300-563.60-82
Time-Line:
Description Total Project Cost: $899,995
Install distribution capacitors throughout the system to correct poor power factor on distribution circuits. Install capacitor controllers capable of
two-way communication to provide real-time monitoring and remote control operation. These controllers will be capable of switching the
capacitors on and off to comply with system requirements. This project will also replace outdated substation equipment, capable of advanced
metering such as power factor and harmonics to further analyze system performance remotely. Lastly, distribution line recorders will be
purchased and installed to provide power factor recordings to fine tune this operation.
COMMENTS: The required substation equipment installation will be completed in two phases. FY2013 will upgrade the required
communication equipment installed 20 years ago. FY2014 will install equipment capable of extracting system data, for enhanced performance
analyzing. The completion of these two phases will ultimately reduce engineering time and costs because of remote access to all substations. In
addition to this advanced metering, event report extraction and analysis, relay settings review and installation, and advancements to our 24 hour
system operation center will be also be realized. FY2015 -FY2017 will be the addition of capacitor banks and controllers into the distribution
system.
Justification
Additional capacitance is required in order to meet system power factor requirements at the Delmarva Power and Light interchange point. This
was substantiated through a load-flow study conducted by Shaw in early 2004 and distribution study by Wilson & Wilson in 2006. The current
capacitor controls are not providing the granularity required to turn them off and on as required to meet both the power quality requirements of
our customers and DP&L requirements. Additional controls are required to fine tune the systems operation.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Without the additional capacitor banks and more importantly
controls, the City may experience a low/high voltage problem at the customer level and/or the possibility of having to pay power factor penalties
to Delmarva Power and Light.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
564,995 Construction/Maintenance 125,000 60,000 50,000 50,000 50,000 335,000
Total Total 125,000 60,000 50,000 50,000 50,000 335,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
564,995 Electric I & E Fund 125,000 60,000 50,000 50,000 50,000 335,000
Total Total 125,000 60,000 50,000 50,000 50,000 335,000
Budget Impact/Other
Monday, May 14, 2012
Page 103
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1208
Project Name Transmission Line Maintenance Program
Type Maintenance Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority 7 --
New Project: No Account Number: 487-8300-563.70-35
Time-Line:
Description Total Project Cost: $450,000
Replace aging porcelain insulators and related components on the transmission system with new polymer insulators and components.
COMMENTS: 69kV transmission line segments Horsepond Road to Lafferty Lane and the NRG leased line (from North Street substation to
DP&L’s Kent substation) are scheduled for FY13.
Justification
Insulators have a defined equipment life due to sun and weather conditions breaking down the porcelain and base bonding cement. Insulators
installed in 1960's and 1970's are due for replacement because of this deterioration. We have experienced several transmission outages due to
insulator failure. Replacing the insulators should extend the life an additional 30 years.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Outages may occur if insulators are not replaced and fail due to
deterioration.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
75,000 Construction/Maintenance 75,000 75,000 75,000 75,000 75,000 375,000
Total Total 75,000 75,000 75,000 75,000 75,000 375,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
75,000 Electric I & E Fund 75,000 75,000 75,000 75,000 75,000 375,000
Total Total 75,000 75,000 75,000 75,000 75,000 375,000
Budget Impact/Other
Monday, May 14, 2012
Page 104
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1209
Project Name SCADA Master Hardware Replacement
Type Improvement Department Electric Engineering
Useful Life 5 years Contact Electric Director
Category Electric Priority 6 --
New Project: Yes Account Number: 487-8300-563.80-38
Time-Line:
Description Total Project Cost: $75,000
This project will replace the Master Station hardware. The Master Station receives all the analog data, alarms and control for all electrical
substations and wastewater lift stations. The Master Station in comprised of Dual Host Servers, Dual Operator consoles, paging system, web
server, 2-Firewalls for DMZ and One remote access/support firewall.
TIME-LINE/CURRENT STATUS: Equipment will be ordered and replaced during the FY 17 budget year.
Justification
The equipment will reach the end of its expected life. It should be noted that this computer system operates 24/7. The additional firewalls are
required to meet required NERC CIP Cyber Security Standards.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: If the system fails we will not be able to monitor or control electrical
substations and we will not be able to view alarms for wastewater lift stations. This failure could result in electrical outages or wastewater
overflows.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 75,000 75,000
Total 75,000 75,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 75,000 75,000
Total 75,000 75,000
Budget Impact/Other
Monday, May 14, 2012
Page 105
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1301
Project Name 69 kV Substation Switch Replacement
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number: 487-8300-563.70-35
Time-Line:
Description Total Project Cost: $135,000
This project will be replacing obsolete 69kV switches in the substation/transmission system.
COMMENTS: The substations to be completed in FY13 are Danner and Lebanon and FY2014 is the Dover Air Force Base.
Justification
The new switches will be gang operated switches which provide more system stability when operated and more importantly increase operator
safety. The switches to be replaced have reached the life expectancy and the utility has started to experience several switch failures each year
over the past few years due to component fatigue.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: The majority of the switches in the older substations are showing
signs of fatigue resulting in difficult operation (failure to open or close when required), frequent maintenance, and component obsolescence.
Delaying this program will result in continued switch failure possibly resulting in wide-spread power outages.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 55,000 80,000 135,000
Total 55,000 80,000 135,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 55,000 80,000 135,000
Total 55,000 80,000 135,000
Budget Impact/Other
Monday, May 14, 2012
Page 106
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1302
Project Name Horsepond Substation Reliability Upgrade
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number: 487-8300-563.70-27
Time-Line:
Description Total Project Cost: $761,812
The high-side of the substation will be upgraded to include two transmission line protection breakers.
The design and long lead time materials will be completed in FY 2013 and the majority of the materials will be purchased and construction
completed in FY 2014.
Justification
When the transmission line experiences a fault this substation loses power until the short circuit is found and the appropriate switching is
accomplished. With the installation of the line breakers the faulted transmission line will be isolated from the substation and the customers will
not experience an interruption of service.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Accepting the outages in the southeast section of the system during
transmission line faults.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 70,000 60,000 130,000
Construction/Maintenance 100,000 531,812 631,812
Total 170,000 591,812 761,812
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 170,000 591,812 761,812
Total 170,000 591,812 761,812
Budget Impact/Other
Monday, May 14, 2012
Page 107
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1304
Project Name Division Street Substation Fence
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number: 487-8300-563.70-27
Time-Line:
Description Total Project Cost: $70,000
Replace the existing fence at Division Street Substation.
TIME-LINE/CURRENT STATUS: FY 2013
COMMENTS: The existing fence does not meet the National Electric Safety Code (NESC) and is in poor condition. Division Street substation is
located in a populated area with heavy foot traffic. As this structure continues to deteriorate, the safety concern steadily increases. Entrance into
the substation by an unauthorized person, can be deadly!
Justification
This project will replace the existing fence at Division Street Substation with a decorative fence, similar to the fence that was erected at St. Jones
Substation.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Existing structure does not meet the National Electric Safety Code
(NESC).
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 70,000 70,000
Total 70,000 70,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 70,000 70,000
Total 70,000 70,000
Budget Impact/Other
Monday, May 14, 2012
Page 108
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1400
Project Name General Scott Switchgear
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number:
Time-Line:
Description Total Project Cost: $1,150,000
This project will replace the metal clad switchgear and replace the distribution breakers as they have reached the end of their useful life.
Justification
This station carries the industrial and residential load on the west side of Dover. The station distribution switch gear was installed in 1985.
Additionally, the breakers have numerous moving parts, including plastic components that tend to fail with age resulting in mis-operation of the
breaker.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: General Scott’s switchgear is aging and replacing it will reduce the
possibility of outages due to aged equipment failure. Additionally, another feeder will be added to the substation to provide a 12 kV feed to a
large commercial customer. Due to the rate tariffs, this 12kV feed will increase revenue should it become the primary feed, which is currently in
discussion.
TIME-LINE/CURRENT STATUS: Engineering will be completed in FY13. Construction of the new metal clad switchgear in FY14.
Installation and commissioning completed in FY 2015.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 50,000 50,000
Construction/Maintenance 800,000 300,000 1,100,000
Total 50,000 800,000 300,000 1,150,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 50,000 800,000 300,000 1,150,000
Total 50,000 800,000 300,000 1,150,000
Budget Impact/Other
Monday, May 14, 2012
Page 109
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1500
Project Name Horsepond to Cartanza 69 kV Rebuild
Type Improvement Department Electric Engineering
Useful Life 20-25 years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number: TBD
Time-Line:
Description Total Project Cost: $330,467
Replace the poles, conductor, and insulators from Horsepond Substation to Long Point Road.
COMMENTS: Alternative pole materials will be explored to minimize future woodpecker damage to the new segment.
Justification
Currently, the conductor size from Horsepond substation to Long Point Road limits the capacity that can be carried on Feeder 4. Upgrading the
existing 636 ACSR to 795 ACSR will increase the capacity and result in a standard conductor size from Cartanza Substation to Horsepond
Substation. Additionally the poles have nearly reached the life expectancy due to numerous problems with woodpecker destruction. The annual
pole testing program has noted deficiencies in the above ground condition of this line segment.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Aging poles and hardware may fail causing outages in east Dover.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 75,000 75,000
Construction/Maintenance 255,467 255,467
Total 330,467 330,467
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 330,467 330,467
Total 330,467 330,467
Budget Impact/Other
Monday, May 14, 2012
Page 110
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1502
Project Name 69 kV Cable Replacement North Street
Type Improvement Department Electric Engineering
Useful Life 30+ years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number: TBD
Time-Line:
Description Total Project Cost: $565,710
Replace the aging 69 KV underground cables from North Street switching yard to Kraft’s and Proctor & Gamble’s (customer owned) substations.
COMMENTS: Proactively replacing cables that have reached their anticipated life.
Justification
Proctor & Gamble and Kraft are two (2) of the City of Dover’s 69 KV customers and it is our obligation to provide them with adequate and
reliable service. The cables were installed in 1973 and have had two repairs. The first repair was in 1986 and the second repair was in 1992.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Customer outages due to failing conductor. Additionally, the
limited capacity of a single circuit could restrict the possible generation of NRG and the production of Proctor & Gamble and Kraft Foods.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 85,000 85,000
Construction/Maintenance 480,710 480,710
Total 85,000 480,710 565,710
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 85,000 480,710 565,710
Total 85,000 480,710 565,710
Budget Impact/Other
Monday, May 14, 2012
Page 111
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1503
Project Name System Operations Monitoring
Type Improvement Department Electric Engineering
Useful Life 5 years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number:
Time-Line:
Description Total Project Cost: $30,000
Replace the system operations monitoring screens.
Justification
This project replaces the existing monitoring screens in system operations, with projection screens. City staff uses an array of these devices to
view and operate the electric system and the lift stations. Additionally, the Public Utilities recently added 6 security cameras surrounding its
facility and 2 security cameras at the interconnecting substation, which is our connection to the bulk electric system. These monitoring screens
are also utilize in these security hardening measures.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Equip/Vehicle/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 30,000 30,000
Total 30,000 30,000
Budget Impact/Other
Monday, May 14, 2012
Page 112
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1504
Project Name College Road to McKee Substation Feeders
Type Maintenance Department Electric Engineering
Useful Life Contact
Category Electric Priority n/a
New Project: Yes Account Number:
Time-Line:
Description Total Project Cost: $307,000
PROJECT DESCRIPTION: This project will be constructed in conjunction with the water main upgrade planned for this section of Walker Road.
The Electric Division will install conduit, cable and equipment, as the Water Division installs the new water main.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: The aging pole line will require the replacement of overhead wire.
Leaving the overhead line in service increases the chances of weather related damages. Additionally, if this project isn’t constructed in
conjunction with the water main upgrade, the cost of installation significantly increases.
TIME-LINE/CURRENT STATUS: Design will be completed in FY 2014. Material procurement and construction will be completed FY 2015.
COMMENTS: This project will be in conjunction with the water main project. Therefore, if the water main is delayed this project will also be
delayed.
Justification
NEED, JUSTIFICATION, BENEFIT: The installation of the new power lines will provide McKee Run power with improved reliability, because
of the decreased exposure of the feeder to weather events.
THIS PROJECT IS RELATED TO THE FOLLOWING: Walker Road Water Main Upgrade (Water Division)
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 307,000 307,000
Total 307,000 307,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 307,000 307,000
Total 307,000 307,000
Budget Impact/Other
Monday, May 14, 2012
Page 113
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1600
Project Name McKee Run Yard Rebuild
Type Improvement Department Electric Engineering
Useful Life 25+ years Contact Electric Director
Category Electric Priority n/a
New Project: No Account Number: TBD
Time-Line:
Description Total Project Cost: $1,150,000
Refurbish McKee Run switching yard.
TIME-LINE/CURRENT STATUS: The purchase of equipment with long lead times and engineering will be completed in FY 2016.
Construction will be the following year, FY 2017.
Justification
The City of Dover’s electrical system has undergone a complete conversion to a 69KV transmission network. Hence, eliminating the old 22KV
transmission network. Therefore, the 22KV system located at McKee Run Generating Plant should also be eliminated and a second 12470/69
KV step-up transformer should be installed, provided that Units 1 & 2 are still in operation.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 250,000 250,000
Construction/Maintenance 200,000 700,000 900,000
Total 450,000 700,000 1,150,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 450,000 700,000 1,150,000
Total 450,000 700,000 1,150,000
Budget Impact/Other
Monday, May 14, 2012
Page 114
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EE1212
Project Name New Developments
Type Improvement Department Electric T & D
Useful Life 30+ years Contact Electric Director
Category Electric Priority 1
New Project: No Account Number: 4878200-562.Several
Time-Line:
Description Total Project Cost: $4,484,800
This project purchases materials and equipment that are used to provide electric service to new housing developments, businesses, and industrial
developments. Additionally, a portion of this expense is offset by the extension payments whereby new developers pay a $1,100 per residential lot
connection fee, or business and industrial developers pay the total material expense for line extensions.
This is an ongoing project and affects three separate accounts:
487-8200-562.60-31 - $ 70,536
487-8200-562.60-34 - $ 479,464
487-8200-562.60-46 - $ 500,000
COMMENTS: Not all new development projects are known, as some will arise during the year. Village of Maple Dale, Clearview Meadows,
M&L Ventures Storage, Bayard Plaza, Nottingham Meadows, Brentwood Place, 215 Walker Rd, and Bayhealth are project known to be moving
forward in FY13.
Justification
During the course of each budget year, new developers request line extensions for new electric projects. Some are new projects, while other
projects may have received plan approval previously but were not completed for any number of reasons.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 450,000 450,000 450,000 450,000 450,000 2,250,000
Total 450,000 450,000 450,000 450,000 450,000 2,250,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 450,000 450,000 450,000 450,000 450,000 2,250,000
Total 450,000 450,000 450,000 450,000 450,000 2,250,000
Budget Impact/Other
Monday, May 14, 2012
Page 115
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1102
Project Name Units 1 & 2 Cooling Tower Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Electric Director
Category Electric Priority 8 --
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $389,440
This project was developed to repair mechanical and structural components of the Units 1 and 2 cooling tower. The project scope has been
developed through inspections performed in 2009 & 2010, and represents a systematic approach to maintaining the reliability and efficiency of
the tower components. Specific activities scheduled for Fiscal 2013 include the replacement of the towers structural support members located at
the base of the tower.
Justification
This project is needed to maintain the structural integrity of the cooling tower and the continued reliability of the cooling systems mechanical
components. Also, the continued deterioration of the cooling towers performance will lead to load reductions on the unit during periods of high
ambient temperatures. This will occur during the time period when generation costs are at their peak. Additonally, this will aid in meeting the
discharge temperature limitation that is being required by the DRBC (Delaware Rivier Basin Commission)
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
199,140 Miscellaneous 37,300 37,300 153,000
Total Total 37,300 37,300 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
199,140 Electric I & E Fund 37,300 37,300 153,000
Total Total 37,300 37,300 Total
Budget Impact/Other
Monday, May 14, 2012
Page 116
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1202
Project Name McKee Run Unit 3 Boiler Systems
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority 2
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $1,049,000
This fund was developed to perform inspections and repairs to the Unit 3 boiler on a predetermined frequency based on unit operating hours,
required regulatory inspection intervals, and known equipment condition. In general, most work activities are those requiring planned outages and
therefore will be scheduled to coincide with planned outages. Work identified includes the following:
2013 - Boiler safety valve refurbishment and adjustments, Forced draft fan and motor refurbishments, Induced draft fan motor refurbishment
2015 - Boiler safety valve refurbishment and adjustments, Forced draft and induced draft fan and motor refurbishments, feedwater heater repairs
2017 - Major boiler repairs to waterwall, superheater, and reheater tubes, air heater steam coil replacement
Justification
Critical system equipment represents components that, if they fail, will result in loss of generation and or capacity. Routine evaluation of the
condition of critical components will allow for proper prioritization of maintenance activities and resources. Delaying this project could result in
the failure of critical unit equipment and subsequent loss of generation and or capacity. More importantly, component failure could also result in
safety risk to personnel.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
130,000 Construction/Maintenance 129,000 144,000 344,000 617,000 302,000
Total Total 129,000 144,000 344,000 617,000 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
130,000 Electric I & E Fund 129,000 144,000 344,000 617,000 302,000
Total Total 129,000 144,000 344,000 617,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 117
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1203
Project Name McKee Run Unit 3 Auxillary System Components
Type Maintenance Department Power Plant
Useful Life Unknown Contact Electric Director
Category Electric Priority 4
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $772,500
This project will perform inspections and repairs of unit 3 auxillary system components that have been identified as critical through the plant life
assessment study. Critical auxillary sysem components are those that could result in unit load reduction or outage with consequential loss of
capacity and/or generation although they would not individually affect the long range financial viability of the unit. Components identified will be
addressed in 2013 inlcude the 3B condensate pump and motor. Components scheduled for 2014 include boiler feed pumps and motors, condenser
circulator pumps and motors Components scheduled for 2015 include condensate pump and motor. Components scheduled for 2016 include
service water pump. Components scheduled for 2017 include circulating water booster pump and motor.
Justification
Critical system components that, if they fail, will result in the loss of generation and/or capacity. Addressing these assets in a systematic fashion
will result in minimize forced outages and eliminate major maintenance expenses associated with component failure. Performing work as
scheduled will also levelize maintenance expenditures. Delaying this project could result in the failure of critical unit equipment and subsequent
loss of generation and/or capacity.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
113,000 Construction/Maintenance 55,000 188,500 45,000 6,000 34,000 328,500 331,000
Total Total 55,000 188,500 45,000 6,000 34,000 328,500 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
113,000 Electric I & E Fund 55,000 188,500 45,000 6,000 34,000 328,500 331,000
Total Total 55,000 188,500 45,000 6,000 34,000 328,500 Total
Budget Impact/Other
Monday, May 14, 2012
Page 118
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1207
Project Name Van Sant Unit 11 Component Replacements
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority 4
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $821,000
This fund was developed to perform inspections and repairs to the VanSant Unit 11 auxiliary equipment on a predetermined frequency based on
unit operating hours, required regulatory inspection intervals, and known equipment condition. Work to be performed to include the following
equipment:
2014 - Refurbish Exhaust frame blower B and motor, B Cooling Water pump and motor, B injection water pump motor
2015 - Replace inlet guide vanes
2016 - Generator inspection and repair
2017 - Injection water pump and motor refurbishment, A Exhaust frame blower and motor refurbishment
Justification
This project is required to fund the replace of capital items that are expected to reach their useful life and will need to be replaced or refurbished
to maintain plant system and unit reliability. Extended equipment and /or unit outage time will result from lack of funding this project. This will
have a direct effect on the cost of energy during the extended outage time as well as increase future energy capacity charges.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
50,000 Construction/Maintenance 75,000 75,000 143,000 78,000 371,000 400,000
Total Total 75,000 75,000 143,000 78,000 371,000 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
50,000 Electric I & E Fund 75,000 75,000 143,000 78,000 371,000 400,000
Total Total 75,000 75,000 143,000 78,000 371,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 119
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1209
Project Name McKee Run & VanSant Preservation of Structures
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority n/a
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $527,000
This project involves the preservation of plant structures in order to prevent deterioration of building structural steel and equipment subject to
corrosion due to the working environment. Included will be the sandblasting and painting of identified structures and equipment along with the
removal of equipment that has been retired in place. This work is an ongoing effort spanning multiple years. Work identified includes the
following:
2014 - Paint the radiator support structure and diesel cooling water tank at VanSant, Repair and paint the exterior of the circulating water piping
at the base of the Unit 3 condenser, Paint all structural steel bolted connections at grade on Unit 3 boiler.
2016 - Paint Unit 3 stack, replace portions of the stack grounding system
2017 - Paint city water and outside demineralized water storage tank
Justification
Structural steel painting is needed in various areas throughout the plant proper as well as various outbuildings on the plant property to maintain
the physical building structures and equipment in an acceptable condition and prevent further deterioration. This project represents a minimum
preservation and maintenance of structures consistent with the expected life of the station. Consequences of delaying or eliminating this project
will result in the acceleration of deterioration of plant structures and larger future costs associated with structural repairs.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
38,000 Construction/Maintenance 42,000 165,000 142,000 349,000 140,000
Total Total 42,000 165,000 142,000 349,000 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
38,000 Electric I & E Fund 42,000 165,000 142,000 349,000 140,000
Total Total 42,000 165,000 142,000 349,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 120
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1212
Project Name McKee Run Unit 3 Turbine Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority 1
New Project: Account Number:
Time-Line:
Description Total Project Cost: $1,760,000
This project will inspect the Unit 3 turbine and auxiliary equipment to determine repairs needed to keep the unit reliable and to assess remaining
life of the unit. This project will be completed in two phases, an initial limited inspection followed by an extensive detailed inspection and repair
planned outage. The first phase that will be completed in 2012 under Project EG1212 and will utilize borescope equipment to determine
condition of components that can be observed through limited access locations along the turbine casing and through turbine inlet valves. This
inspection will provide a general condition assessment of a portion of the highly stress components of the turbine and may provide insight into
the extent of replacement parts needed to successfully execute phase 2. Phase 2 to be completed later in 2014 will include a full disassembly and
inspection of the turbine and auxiliary equipment. Expenditures in 2013 are for long lead material procurement. Phase 2 costs have been revised
to reflect the need to replace 9th stage blading on the turbine.
Justification
An assessment of the unit needs to be performed to determine condition of the highly stressed turbine components to assure continued reliability.
Documented condition of rotor blading during last inspection noted deterioration of 9th stage blades and temporary repairs performed. A
significant probability that the blades should be replaced. Consequences of delaying or eliminating this project include possible catastrophic
equipment failure and indefinite loss of unit availability.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
348,000 Construction/Maintenance 115,000 1,031,000 10,000 1,156,000 256,000
Total Total 115,000 1,031,000 10,000 1,156,000 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
348,000 Electric I & E Fund 115,000 1,031,000 10,000 1,156,000 256,000
Total Total 115,000 1,031,000 10,000 1,156,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 121
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1304
Project Name McKee Run Units 1 & 2 Component Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Electric Director
Category Electric Priority 4
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $3,116,500
This project will inspect and repair capital equipment associated with the Units 1 and 2 turbine generator and Boiler equipment. Components
identified that will be addressed include the following:
2013- Refurbishment of 2A condensate pump and motor and replacement of heater exchanger level controllers.
2014 - Inspection of turbine nozzles
2015 - Unit 2 boiler feed pump and motor refurbishments
2016 - Major boiler component inspections and repairs.
2017 - Replacement of boiler feed recirculation valves, circulating water pump refurbishment, replacement of steam air heater coils
Justification
This project is required to fund the repair and /or replace of capital items that are expected to reach their useful life and will need to be repaired
or replaced to maintain plant system and unit reliability. Extended equipment and /or unit outage time will result from lack of funding this
project. This will have a direct effect on the cost of energy during the extended outage time as well as increase future energy capacity charges.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
364,000 Construction/Maintenance 52,000 100,000 44,000 172,000 234,000 602,000 2,150,500
Total Total 52,000 100,000 44,000 172,000 234,000 602,000 Total
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
364,000 Electric I & E Fund 52,000 100,000 44,000 172,000 234,000 602,000 2,150,500
Total Total 52,000 100,000 44,000 172,000 234,000 602,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 122
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1306
Project Name McKee Run Turbine Level Window Modification
Type Improvement Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority 6 --
New Project: Yes Account Number:
Time-Line:
Description Total Project Cost: $85,000
PROJECT DESCRIPTION: Install equipment for safety of plant personnel and to maintain reliability of plant equipment in the event of an
explosion at the McKee Run switchyard.
Equipment includes the following:
System Design (2013) - $5k
Purchase of window blocking materials (2013) - $20k
Purchase of Fire Shutters for windows (2013) - $20k
Installation (2013) - $40k
Justification
This project is a result of an insurance inspection and recommendation to install equipment or window blocking materials for the protection of
plant personnel and plant equipment in the event of an explosion of electrical distribution equipment in the McKee Run switchyard.
Consequences of delaying or eliminating this project will be the continued risk of personal injury or damage to electrical distribution equipment.
In addition, no benefit to, or even an increase of, insurance company premium costs could result due to not acting on insurance company
recommendations.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 5,000 5,000
Construction/Maintenance 80,000 80,000
Total 85,000 85,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 85,000 85,000
Total 85,000 85,000
Budget Impact/Other
Monday, May 14, 2012
Page 123
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1307
Project Name McKee Run Unit 3 Air Heater Expansion Joint
Type Maintenance Department Power Plant
Useful Life Unknown Contact Electric Director
Category Electric Priority 7 --
New Project: Yes Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $215,000
This project will replace the Unit 3 boiler air heater, hot air outlet expansion joint closest to the air heater which has reached the end of its’ useful
life. This replacement is the last expansion joint to be replaced in the hot gas duct from the boiler to the air heater. The work is scheduled to be
completed in the fall of 2013. This work was previously scheduled for 2017 but was accelerated due to its’ deteriorated condition.
Justification
This expansion joint has failed in multiple locations, allowing hot air to escape from the ductwork exiting the boiler. This has a direct impact on
the performance of the Unit, limiting capacity and reducing efficiency. Replacement of this expansion joint is necessary in order to recover unit
efficiency. This project will be completed in 2013.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
135,000 Construction/Maintenance 80,000 80,000
Total Total 80,000 80,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
135,000 Electric I & E Fund 80,000 80,000
Total Total 80,000 80,000
Budget Impact/Other
Monday, May 14, 2012
Page 124
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1309
Project Name McKee Run Unit 3 Stack Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Electric Director
Category Electric Priority 9 --
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $102,000
An inspection and assessment will be made to determine the condition of the stack and also provide cost of any repairs required to extend the life
of the stack for 15 to 20 yrs. Repairs to the stack lining and exterior will be made in order to allow continued operation of Unit 3. A determination
for the necessity of repairs to Unit 3 stack will be performed on an annual basis. An internal and external inspection will be performed by outside
consultant in 2012.
Justification
Current plans are to contract for an external and internal inspection in 2013 to develop an action plan to extend the life of the stack as well as
develop costs for the repairs of the stack by outside contractors. We will contract for needed repairs as determined by the 2013 and subsequent
yearly inspections. Delaying necessary repairs could lead to more costly repairs in the future, unplanned forced outage on Unit 3, fall out of
internal material upon the surrounding community and potential injury to employees. Earnings from the sale of capacity may also be affected.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
25,000 Miscellaneous 27,000 50,000 77,000
Total Total 27,000 50,000 77,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
25,000 Electric I & E Fund 27,000 50,000 77,000
Total Total 27,000 50,000 77,000
Budget Impact/Other
Monday, May 14, 2012
Page 125
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1310
Project Name McKee Run Units 1 & 2 Stack Repairs
Type Maintenance Department Power Plant
Useful Life 10-15 years Contact Electric Director
Category Electric Priority 10 --
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $75,000
Repairs to the stack lining and exterior will be made in order allow continued operation of these units. In addition, an assessment will be made to
determine the remaining life of the stack and also provide cost of any repairs required to extend the life of the stack for another 10 to 15 yrs. The
current expectation is to perform limited repairs in fiscal year 2013. An evaluation of future repairs will also be made.
Justification
This stack has been in service past its expected life and repairs are needed to ensure continued operation for the remaining life of the Units.
Should this stack need to be taken out of service, it will necessitate taking both Units 1 and 2 offline. Delaying necessary repairs could lead to
more costly repairs in the future, simultaneous unplanned forced outages on both Units 1 & 2, fall out of internal material upon the surrounding
community and potential injury to employees. Earnings from the sale of capacity will also be affected.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Miscellaneous 75,000 75,000
Total 75,000 75,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 75,000 75,000
Total 75,000 75,000
Budget Impact/Other
Monday, May 14, 2012
Page 126
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1311
Project Name Van Sant Capacity Increase
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority n/a
New Project: Yes Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $550,000
This project will increase the electric generation output of the VanSant Unit 11 gas turbine generator by installing technology specifically
designed to decrease the air inlet temperatures to the gas turbine during high ambient air temperature days. This project is dependent on obtaining
favorable payback as determined by an evaluation of available technologies conducted as part of a strategically budgeted initiative that will
determine the most cost effective technology to utilize. This initiative is contained in the 2012 Strategic level of the Power Plant O&M budget.
The project is estimated to be completed in 2013. Multiple technologies to achieve the increased generator output will be evaluated in 2012.
Justification
This project will provide a positive cash flow within 5 years of installation as the City of Dover will benefit through additional capacity and
generation sales. Each year this project is delayed will result in lost revenue opportunity to the City of Dover.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 75,000 75,000
Construction/Maintenance 475,000 475,000
Total 550,000 550,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Future Capacity Reserve Fund 550,000 550,000
Total 550,000 550,000
Budget Impact/Other
Monday, May 14, 2012
Page 127
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1312
Project Name McKee Run Unit 3 Generator Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority 1
New Project: No Account Number:
Time-Line:
Description Total Project Cost: $236,000
This project will inspect the Unit 3 turbine generator, and auxiliary equipment to determine repairs needed to keep the generator operational and
to assess remaining life of the unit. This project will include a full disassembly and inspection of the generator and auxiliary equipment. Extensive
electrical testing of the generator will be performed.
Justification
An assessment of the generator needs to be performed to determine mechanical and electrical condition of the internal turbine components to
assure continued reliability. This unit has not been inspected since 2000 and Industry maintenance practices recommend inspection intervals not
exceeding 10 years. Consequences of delaying or eliminating this project include a possible equipment failure and extended or indefinite loss of
unit availability.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Construction/Maintenance 236,000 236,000
Total 236,000 236,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 236,000 236,000
Total 236,000 236,000
Budget Impact/Other
Monday, May 14, 2012
Page 128
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1401
Project Name Units 1 & 2 Boiler Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority 2
New Project: Yes Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $407,000
This fund was developed to perform inspections and repairs to the Units 1 and 2 boilers on a predetermined frequency based on unit operating
hours, required regulatory inspection intervals, and known equipment condition. In general, most work activities are those requiring planned
outages and therefore will be scheduled to coincide with planned outages.
Work scheduled includes the following:
2014 - Boiler safety valve refurbishment and inspections.
2015 - Boiler air heater inspection and repair
2016 - Boiler safety valve refurbishment and inspections
Justification
This project is required to fund the repair/replacement of capital items that are expected to reach their useful life. Critical system equipment
represents components that, if they fail, will result in loss of generation and or capacity. Routine evaluation of the condition of critical
components will allow for proper prioritization of maintenance activities and resources. Delaying this project could result in the failure of critical
unit equipment and subsequent loss of generation and or capacity. More importantly, component failure could also result in safety risk to
personnel.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Construction/Maintenance 18,000 20,000 29,000 67,000 340,000
Total 18,000 20,000 29,000 67,000 Total
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Electric I & E Fund 18,000 20,000 29,000 67,000 340,000
Total 18,000 20,000 29,000 67,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 129
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1402
Project Name Unit 3 Cooling Tower Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Electric Director
Category Electric Priority 1
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $1,159,338
This project was developed to repair mechanical and structural components of the Unit 3. The project scope has been developed through
inspections performed in 2009 and 2010 and represents a systematic approach to maintaining the reliability and efficiency of the tower
components. Specific activities scheduled for 2015 include installing new tower fill which will recover or improve the heat transfer efficiency of
the tower and assure that the discharge temperature of the cooling tower continues to meet regulatory requirements. Work scheduled for 2016
includes cooling fax gear box refurbishments. Work scheduled for 2017 includes replacing cooling fan motors and replacing tower wall casing.
Justification
This project is needed to maintain the structural integrity of the cooling tower and the continued reliability of cooling system mechanical
components. Also continued deterioration of the cooling tower performance will lead to load reductions on the unit during periods of high
ambient temperatures. This will occur during the time period when generation costs are at their peak.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
398,338 Construction/Maintenance 571,000 52,000 138,000 761,000
Total Total 571,000 52,000 138,000 761,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
398,338 Electric I & E Fund 571,000 52,000 138,000 761,000
Total Total 571,000 52,000 138,000 761,000
Budget Impact/Other
Monday, May 14, 2012
Page 130
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1403
Project Name Unit 3 Cooling Water Line Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority n/a
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $265,000
This project will inspect and repair the underground cooling water line from the Unit 3 condenser to the cooling tower. An inspection of the pipe
condition will be performed on this pipe in the fall of 2013 to develop a repair/replace action plan to address the suitability for continued
operation as well as extending the life of the piping beyond 2013. The actual repairs will be completed in the spring of 2014.. Completion of the
project as scheduled will eliminate the need to add additional O&M funding for emergency repairs in future years. The budgeted costs assume
only repairs of the lines (2) from the cooling tower to the plant exterior wall.
Justification
The condition of the underground cooling water line has required numerous repairs over the life of the plant and is expected to reach its useful
life in the 2015-2020 time period. It is expected that the repair frequency will accelerate over the next several years as the internal pipe coating
continues to degrade. Delaying this project beyond 2014 will increase the risk of a failure causing an extended unit outage to repair or replace the
failed pipe as well incur water spillage to the surrounding ground. Additional budget dollars will need to be allocated to make the repairs of the
failed piping.
Prior Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
25,000 Miscellaneous 240,000 240,000
Total Total 240,000 240,000
Prior Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
25,000 Electric I & E Fund 240,000 240,000
Total Total 240,000 240,000
Budget Impact/Other
Monday, May 14, 2012
Page 131
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1406
Project Name McKee Run High Energy Piping Repairs
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority 1
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $80,000
This project will address deficiencies in highly stressed piping systems at the McKee Run Generating Station found during inspections conducted
on those piping systems. The inspections are scheduled for early 2013. Included will be the main steam, hot and cold reheat lines as well as feed
water and condensate piping of all units. This work is intended to repair or replace piping and pipe supports that are found to be defective before
any long term stress or flow induced pipe failures occur.
Justification
High energy piping systems are subject to service related structural failure due to the high temperature service under which they operate.
Additionally, lower temperature piping systems are subject to accelerated corrosion rates due to flow characteristics. Identifying and correcting
any such piping degradation before failures occur will prevent extended forced outages to make emergency repairs/replacement. Delaying this
project could result in the failure of critical piping systems and subsequent loss of generation and or capacity. Most importantly, component
failure could also result in serious safety risk to personnel. This project is one that is required to meet insurance company recommendations.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 80,000 80,000
Total 80,000 80,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 80,000 80,000
Total 80,000 80,000
Budget Impact/Other
Monday, May 14, 2012
Page 132
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1407
Project Name Metering System Upgrades
Type Maintenance Department Power Plant
Useful Life Unknown Contact Electric Director
Category Electric Priority 6 --
New Project: Yes Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $150,000
This project involves the replacement of all the meters (15) in the COD system that are currently tied to the metering computer at McKee Run
Generating Station. In addition, costs associated with the replacement of the Metering computer (PC) at McKee Run and an alternate demark for
the telephone line that the NRG meter uses to communicate data to the McKee Run computer is included in this project. A metering computer
would also be installed at the City of Dover dispatch center for use. At the present time, there are annual maintenance costs associated with
keeping the reliability of the meters and the metering software current. In addition, a software maintenance fee is included in the annual budget.
Activities scheduled for 2014 include planning and design. Installation and purchase to be completed in 2015.
Justification
The meters are 14 years old and the metering computer is 4 years old and nearing the end of their recommended service life. The metering system
provides the City of Dover, T.E.A, NAES, PJM, NRG and Delmarva Power with accurate data for revenue metering, cost metering, load
scheduling and forecasting and for generator capacity rating verification purposes. Submission of this data/information is also an important part
of compliance with various NERC standards. Non-compliance with NERC Standards could result in fines and other penalties. Delaying or
eliminating this project could have a substantial effect on the City of Dover electric bill. Failures to the meters or computers would force the City
of Dover to rely on DPL metering, NRG metering and/or other methods of determining load usage costs and generation revenues. In addition,
costs associated with the manual documentation and submission of the information would be labor intensive and could become extremely costly.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total
Planning/Design 25,000 25,000
Construction/Maintenance 125,000 125,000
Total 25,000 125,000 150,000
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total
Electric I & E Fund 25,000 125,000 150,000
Total 25,000 125,000 150,000
Budget Impact/Other
Monday, May 14, 2012
Page 133
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1601
Project Name McKee Run Building Equipment Replacement
Type Maintenance Department Power Plant
Useful Life Unknown Contact Plant Manager
Category Electric Priority n/a
New Project: Yes Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $330,000
This project includes the replacement of certain building support systems that are expected to reach their useful life. The specific building systems
to be addressed include:
Supervisors Office Roof top Air Conditioners – 2016-$30,000
#3 elevator refurbishment- 2016- $60,000
Turbine roof exhaust fans- 2016 - $20,000
Control Room rooftop air Conditioning Unit – 2017 - $50,000
Justification
This project is required to fund the replacement of roof top air conditioners and exhaust fans starting in 2016. In addition, the #3 elevator is
expected to require significant rebuilding to maintain its reliability. Major maintenance was performed last in 1999. Continuing increase in the
costs to maintain this equipment will result from the lack of funding this project. In addition, critical temperature control is necessary to keep
plant instrumentation located in the control room at acceptable operating conditions. Allowing the temperature to exceed design conditions could
contribute to reduced control equipment life and possible reduced unit reliability.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Construction/Maintenance 110,000 50,000 160,000 170,000
Total 110,000 50,000 160,000 Total
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Electric I & E Fund 110,000 50,000 160,000 170,000
Total 110,000 50,000 160,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 134
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # EG1701
Project Name Van Sant Unit 11 Major Overhaul/Inspection
Type Improvement Department Power Plant
Useful Life 20 years Contact Electric Director
Category Electric Priority 3
New Project: No Account Number: 487-8101-591.40-31
Time-Line:
Description Total Project Cost: $1,941,000
This project will perform a major overhaul on the turbine generator based on Original Equipment Manufacturer (OEM) recommended repair
frequency which is based on factored starts of the unit from first commissioning and from last inspection/repair interval. This project will be
implemented in 2017 with long lead material purchases and installation in 2018.
Justification
This project is required to fund the purchase of all parts needed to perform a major overhaul on the unit based on estimated factored starts since
unit was first commissioned and since last the Hot Gas Path inspection. This project will span the course of three years. In Year 1, the majority of
the long lead parts will be purchased. Services will be identified in year 2 and the actual installation will be performed in Year 2. Extended
equipment and /or unit outage time will result from lack of funding this project. This will have a direct effect on the cost of energy during the
extended outage time as well as increase future energy capacity charges. In addition, gradual degradation of the unit’s output could occur which
would have a negative effect on the capacity rating of the unit and could result in catastrophic failure of the unit.
Expenditures FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Construction/Maintenance 900,000 900,000 1,041,000
Total 900,000 900,000 Total
Funding Sources FY 13 FY 14 FY 15 FY 16 FY 17 Total Future
Electric I & E Fund 900,000 900,000 1,041,000
Total 900,000 900,000 Total
Budget Impact/Other
Monday, May 14, 2012
Page 135
1 of 5
City of Dover
Capital Investment Plan
Project Tracking Report
April 30, 2012
Points to Remember -
* Original Project Budget = Original Total Project Budget initially included in approved annual budget.
* Latest Project Budget = Revised Total Project Budget included in most recent approved annual budget or one of the following:
bond resolution, revolving fund loan agreement, Council approved budget amendment, or City Manager approved amendment as per
the Budget Amendment Procedure.
* Current Fiscal Year - Revised Fiscal Year Budget = Current Year approved project budgets plus carry forward balances of unspent
budgets in the prior fiscal year. Project Carry Forward balances will be submitted to City Council for amendment in January 2010.
Can also be amended with City Manager approval per the Budget Amendment Procedure.
* Water Quality, Inflow/Infiltration, Distribution Upgrades and New Development projects are budgeted as a blanket project and once
individual projects are identified and estimated they are created using an allocation of the overall budgeted amount.
* Status and Comments provided by City Manager.
* For Finance purposes projects are considered completed when placed in service and all charges have been processed.
Community Water & Total
Current Year Budget Funding Sources General Transportation Wastewater Electric CIP
Budget Balance $ 77,000 $ 118,588 $ 430,591 $ 360,333 $ 986,512
Library Funding - FY11 Budget Balance 100,962 - - 87,045 188,007
Federal and/or State Grants 7,422,183 1,400,000 - - 8,822,183
Library Green Energy/Bridge Loan 2,700,000 - - - 2,700,000
Friends of the Library Donation 210,000 - - - 210,000
Kent County Library Contribution 1,000,000 - - - 1,000,000
Library Reserve 2,590,784 - - - 2,590,784
Construction Loan 274,961 - - - 274,961
Community Transportation Fund - FY11 Balances - 678,612 - - 678,612
Revolving Fund Loans - - 4,309,821 - 4,309,821
Transfer from Capital Reserves - - - 370,730 370,730
Impact Fees - - 867,032 - 867,032
Loan Proceeds - Streets & City Hall 1,970,000 - - - 1,970,000
Transfer Loan Proceeds to CT Fund - Streets - 875,000 - - 875,000
Transfer from Operating Funds 623,847 - 1,750,000 3,500,000 5,873,847
Interest Earned 10,900 2,800 - 38,400 52,100
Total Funding Sources (Unaudited) $ 16,980,637 $ 3,075,000 $ 7,357,444 $ 4,356,508 $ 31,769,589
Page 136
City of Dover
General Fund - Major CIP Projects
2 of 5
April, 2012
Hide TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY2009
Bid Pack A - Done.
2 LB0901 M/G New Library Project $ 18,200,000 $ 20,469,080 $ 11,911,051 $ 8,558,029 58.2% $ 11,195,009 $ 14,298,890 $ 7,740,861 54.1% Started Bid Pack B - 40% Complete/Construction
3 Totals - FY09 $ 18,200,000 $ 20,469,080 $ 11,911,051 $ 8,558,029 58.2% $ 11,195,009 $ 14,298,890 $ 7,740,861 54.1%
4
5 FY2012
6 --- Ann FD Truck Payment $ 244,820 $ 257,720 $ 258,456 $ (736) 100.3% $ 244,820 $ 257,720 $ 258,456 100.3%
Sweeper received February 2012;
7 --- Vehicles & Equipment 377,927 364,027 353,551 10,476 97.1% 377,927 364,027 353,551 97.1% 99% Sanitation Bulk Truck due in April 2012
Roof Replacement @
8 PR1201 Dover Park 30,000 30,000 - 30,000 0.0% 30,000 30,000 - 0.0%
Concrete work complete on
Independence Boulevard and Hazel
Road. Site work initiated on North Street
Roudabout. Wesley State Street entrance
9 CT Fund B/L Streets & Alleys Program 1,000,000 1,750,000 - 1,750,000 0.0% 1,000,000 1,750,000 - 0.0% 35% complete.
10 ST1202 Concrete Program 30,000 30,000 - 30,000 0.0% 30,000 30,000 - 0.0% 0% Bids distributed and returned in March
Streets Dump Truck
11 ST1203 Refurbishment 30,000 30,000 10,751 19,249 35.8% 30,000 30,000 10,751 35.8% 33% One Dump Truck refurbished out of three.
12 City Hall Sprinkler System - 220,000 - 220,000 0.0% - 220,000 - 0.0%
13 Totals - FY12 $ 1,712,747 $ 2,681,747 $ 622,758 $ 2,058,989 23.2% $ 1,712,747 $ 2,681,747 $ 622,758 23.2%
14
15 Grand Totals $ 19,912,747 $ 23,150,827 $ 12,533,808 $ 10,617,019 54.1% $ 12,907,756 $ 16,980,637 $ 8,363,618 49.3%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
G = Grant funded project
B/L = To be financed through bonds or commercial loan; Projects will be completed through CT Fund, therefore the loan proceeds will be transferred from Capital Fund into the Community Transportation Fund
Page 137
City of Dover
Community Transportation & General Fund Street Funds - Major CIP Projects
3 of 5
April, 2012
Hide TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY 2007
2 CT0708 M E. Water Street Brick $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ - $ 65,000 $ - 0.0% Specialty contract needed.
3 Totals $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ - $ 65,000 $ - 0.0%
4
5 FY 2009
6 CT0977 M Schutte Parking Lot $ 21,950 $ 21,950 $ - $ 21,950 0.0% $ - $ 21,950 $ - 0.0% Deferred
7 CT1165 M Rte. 13,N. State -Kings Hwy 591,662 591,662 - 591,662 0.0% - 591,662 - 0.0%
CT1162 M Library Access Road - 68,000 68,000 - 0.0% - 68,000 68,000 100.0% State paid for whole paving proj
8 Totals $ 613,612 $ 681,612 $ 68,000 $ 613,612 10.0% $ - $ 681,612 $ 68,000 10.0%
9
10 FY2012
Concrete work on Independence
11 CT M Street Projects - State Funds $ 950,000 $ 800,000 $ 9,135 $ 790,865 1.1% $ 950,000 $ 53,388 $ 9,135 17.1% 35% Boulevard complete.
Concrete work on Hazel
12 Various B/L Street Projects - General Fund 350,000 1,750,000 88,990 1,661,010 5.1% 350,000 875,000 88,990 35% complete.
13 CT1201 M North Street Roundabout - 500,000 - 500,000 0.0% - 500,000 - 0.0% 35% Site work initiated.
14 TE1201 M Lincoln Park Center 900,000 900,000 6,211 893,789 0.0% 900,000 900,000 6,211 0.7% Started
15 Totals $ 2,200,000 $ 3,950,000 $ 104,336 $ 3,845,664 2.6% $ 2,200,000 $ 2,328,388 $ 104,336 4.7%
16
17 Grand Totals $ 2,878,612 $ 4,696,612 $ 172,336 $ 4,524,276 3.7% $ 2,200,000 $ 3,075,000 $ 172,336 7.8%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
C = Project funded by combination of CT Funds and General Fund
B/L = To be financed through bonds or commercial loan; Projects will be completed through CT Fund, therefore the loan proceeds will be transferred from Capital Fund into the Community Transportation Fund;
Page 138
City of Dover
Water/Wastewater Improvement & Extension Fund - Major CIP Projects
4 of 5
April, 2012
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Approved Revised Fiscal % Status /
Project Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget %
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Complete Comments
1 FY 2008
Option to purchase land agreement
2 WD0804 M
1.0 MG Elevated Water Storage $ 4,196,600 $ 2,590,000 $ 31,861 $ 2,558,139 1.2% $ - $ 178,916 $ 10,777 6.0% Started under review
3 WD0805 M
Piney Point Well 398,800 665,000 71,643 593,357 10.8% - 62,319 3,961 6.4% Started DNREC permitting ongoing
US 13 East Sanitary Sewer
4 WW0810 M/SL Interceptor 2,376,800 3,022,562 3,232,228 (209,666) 106.9% - 295,722 286,629 96.9% 100.0% Complete
5 Totals - FY08 $ 6,972,200 $ 6,277,562 $ 3,335,732 $ 2,941,830 53.1% $ - $ 536,957 $ 301,367 56.1%
6
7 FY2009
8 WQ0905 M/SL Bayard Avenue $ 590,910 $ 490,910 $ 537,400 $ (46,490) 109.5% $ - $ 259,121 $ 250,610 96.7% 98.0% Final connection scheduled for May.
Constr complete; retainage/change
9 WQ0907 M/SL Route 13 Water Main 1,058,700 2,282,682 1,960,959 321,723 85.9% - 1,899,872 1,548,149 81.5% 99.0% orders pending.
10 Totals - FY09 $ 1,649,610 $ 2,773,592 $ 2,498,359 $ 275,233 90.1% $ - $ 2,158,993 $ 1,798,759 83.3%
11
12 FY2010
13 WW1001 M/SL Inflow/Infiltration Removal $ 1,800,000 $ 2,122,536 $ 1,761,684 $ 360,852 83.0% $ 1,800,000 $ 766,201 $ 404,128 52.7% 100.0% Complete
Pump station delivered; installation
14 WW1007 M/SL Fox Hall Pump Station 427,900 392,044 67,389 324,655 17.2% - 360,687 17,176 4.8% 70.0% underway.
Construction complete; closeout
15 WW1008 M/SL Heatherfield F/M Rerouting 220,400 324,916 210,351 114,565 64.7% - 237,506 161,656 68.1% 99.0% documents pending.
16 WW1010 I Tar Ditch Interceptor Upgrade 518,230 518,230 28,014 490,216 5.4% - 495,359 5,143 1.0% Started Easement request sent to residents
17 Totals - FY10 $ 2,966,530 $ 3,357,726 $ 2,067,438 $ 1,290,288 61.6% $ 1,800,000 $ 1,859,753 $ 588,103 31.6%
18
19 FY2011
20 WQ1103 WQI - Ross Street - 71,840 - 71,840 0.0% 71,840 - - 0.0% --- Canceled
Design and construction work
21 WW1101 M/SL Inflow/Infiltration Removal 500,000 500,000 446,169 53,831 89.2% - 457,601 403,769 88.2% 100.0% complete; final bills pending.
22 WW1104 SL Lepore Road P/S Replacement 52,000 402,000 72,918 329,082 18.1% 350,000 350,000 17,382 5.0% Started Out to bid, due May 22
23 Totals - FY11 $ 552,000 $ 973,840 $ 519,087 $ 454,753 53.3% $ 421,840 $ 807,601 $ 421,151 52.1%
24
25 FY2012
All four vehicles received and
26 --- Vehicles & Equipment $ 115,000 $ 115,000 $ 110,514 $ 4,486 96.1% $ 115,000 $ 115,000 $ 110,514 96.1% 100.0% processed by the end of January.
27 WD1201 Pay-As-You-Go Water Station 30,240 30,240 - 30,240 0.0% 30,240 30,240 - 0.0% Started Specs being developed
28 WD1202 R Misc. Distribution Upgrades 60,000 60,000 5,706 54,294 9.5% 60,000 60,000 5,706 9.5% 25.0% Misc. repairs or emergencies
Deep Well #1 and #9 complete; Well
29 WD1203 R Wellhead Redevelopment Program 65,000 65,000 44,371 20,629 68.3% 65,000 65,000 44,371 68.3% 50.0% #10 rehab.
30 WD1204 R Emergency Generators 80,000 80,000 - 80,000 0.0% 80,000 - - 0.0% Grant dependent
31 WQ1201 WQI - Wesley Campus 51,200 51,200 262.50 50,938 0.5% 51,200 106,200 263 0.2% Started Project to start April 9, 2012.
Initial design complete; under staff
32 WQ1202 WQI - New Street 97,120 97,120 9,600.00 87,520 9.9% 97,120 113,960 9,600 8.4% Started review.
Rodney Road complete.
Pennsylvania Avenue started.
Madison and American Avenues
33 WQ1203 WQI - Silver Lake 279,840 279,840 129,655.70 150,184 46.3% 279,840 279,840 129,656 46.3% 40.0% pending.
Design somplete. Bid package ready
34 WW1201 M/SL Inflow/Infiltration Removal 1,000,000 1,000,000 28,354 971,646 2.8% 1,000,000 1,000,000 28,354 2.8% Started for April bid.
35 WW1202 R SCADA Equipment Replacement 84,900 84,900 76,384 8,516 90.0% 84,900 84,900 76,384 90.0% 100.0% Complete
36 WW1203 R Misc. Sewer System Improve 37,000 37,000 9,935 27,065 26.9% 37,000 37,000 9,935 26.9% 50.0% Misc. repairs or emergencies
BALTRAY PS not WIL. UNIV. Initial
37 WW1204 M Wilmington College Pump Station 25,000 25,000 18,708 6,292 74.8% 25,000 25,000 18,708 74.8% 60.0% design complete; staff reviewing.
38 WW1205 M Dover Brook Gardens P/S Replace 15,000 15,000 7,744.42 7,256 51.6% 15,000 15,000 7,744 51.6% 60.0% Initial design complete; staff review.
39 WW1206 M Brandywine Pump Station Replace 52,000 52,000 29,483.57 22,516 56.7% 52,000 52,000 29,484 56.7% 60.0% Initial design complete; staff review.
McKee Rd Pump Station Initial design complete; staff review
40 WW1207 M Communator Replacement 10,000 10,000 7,197.05 2,803 72.0% 10,000 10,000 7,197 72.0% 60.0%
41 $ 2,002,300 $ 2,002,300 $ 477,914.42 $ 1,524,386 0.0% $ 2,002,300 $ 1,994,140 $ 477,914 24.0%
42
43 Grand Totals $ 14,142,640 $ 15,385,020 $ 8,898,531 $ 6,486,489 57.8% $ 4,224,140 $ 7,357,444 $ 3,587,295 48.8%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
SL = State Loan Project - construction phase is financed
I = Impact Fee (partially) financed project
Page 139
City of Dover 5 of 5
Electric Improvement & Extension Fund - Major CIP Projects
April, 2012
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Current Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY2011
2 EG1102 M Units 1 & 2 Cooling Tower 372,400 199,140 134,538 64,602 67.6% 25,410 25,410 400 1.6% Work deferred to 2012
Work suspended, awaiting
3 EG1107 M Units 1 & 2 Life Extension 802,000 409,000 308,968 100,032 75.5% 184,000 196,331 96,299 49.0% In process decision on units 1&2 operation
4 EG1112 M Unit 3 Heat Expansion Joint - 150,000 143,508 6,492 95.7% 70,000 82,807 76,315 92.2% Complete
5 EG1113 Units 1 & 2 Control Modifications - 150,000 141,033 8,967 94.0% - 25,700 16,732 65.1% In process Complete w/Spring outage
6 EG1114 Unit 3 Gas Line Modification - 60,000 39,516 20,484 65.9% - 36,207 15,723 43.4% Complete
7 $ 1,174,400 $ 968,140 $ 767,563 $ 200,577 79.3% $ 279,410 $ 366,455 $ 205,470 56.1%
8
9 FY2012
10 --- Vehicles & Equipment $ 168,828 $ 168,828 $ 105,971 $ 62,857 62.8% $ 168,778 $ 168,778 $ 105,971 62.8% All vehicles received
11 EE1201 Substation PT & CT Replacement 267,715 267,715 218,527 49,188 81.6% 267,715 267,715 218,527 81.6% In process 75% materials received
12 EE1202 R Lighting Project & Rehabilitation 50,000 50,000 49,832 168 99.7% 50,000 50,000 49,832 99.7% Complete
13 EE1203 R Equipment Replacement 40,000 40,000 10,525 29,475 26.3% 40,000 40,000 10,525 26.3% In process Equipment ordered
14 EE1204 Generator Replacement 50,000 50,000 30,961 19,039 61.9% 50,000 50,000 30,961 61.9% Complete
15 EE1205 M Frazier Substation Upgrade 765,247 155,000 153,359 1,641 98.9% 155,000 155,000 153,359 98.9% In process Materials ordered
16 EE1206 R Disb. Feeder Replacement 377,510 377,510 241,201 136,309 63.9% 377,510 353,060 241,201 68.3% In process On-going
17 EE1207 R Disb. Capacitors & Controls 100,000 100,000 27,064 72,936 27.1% 100,000 100,000 27,064 27.1% In process Materials ordered
18 EE1208 R Transmission Line Maintenance 75,000 75,000 75,002 (2) 100.0% 75,000 75,000 75,002 100.0% Started Materials ordered
Scada Master Hardware
19 EE1209 Replacement 75,000 75,000 73,845 1,155 98.5% 75,000 75,000 73,845 98.5% Started Materials ordered
20 EE1210 Substation Battery - 24,500 24,686 (186) 100.8% 24,500 24,500 24,686 100.8% In process 60% materials received
21 EE1212 R UG Transformers 70,536 70,536 69,302 1,234 98.2% 70,536 70,536 69,302 98.2% In process On-going
22 EE1212 R UG Conductors 479,464 479,464 286,636 192,828 59.8% 479,464 479,464 286,636 59.8% In process On-going
23 EE1212 R Meters 50,000 50,000 17,652 32,348 35.3% 50,000 50,000 17,652 35.3% In process On-going
24 EG1201 Unit 3 Boiler Air Heater 440,000 440,000 265,932 174,068 60.4% 440,000 440,000 265,932 60.4% In process Will complete Spring outage;
25 EG1202 M Unit 3 Boiler Systems 390,000 130,000 61,643 68,357 47.4% 130,000 130,000 61,643 47.4% In process Will complete Spring outage;
Unit 3 FD & ID Fan Control Damper
26 EG1203 Upgrade 92,000 92,000 56,878 35,122 61.8% 92,000 92,000 56,878 61.8% In process Will complete Spring outage;
Unit 3 DCS Computers & Software
27 EG1204 Upgrades 85,000 85,000 - 85,000 0.0% 85,000 85,000 - 0.0% In process To be completed by 6/3012;
28 EG1205 R Misc. Equipment Replacement 70,000 70,000 21,280 48,720 30.4% 70,000 70,000 21,280 30.4% In process On-going; 50% complete
Demineralizer Control Replace @
29 EG1206 McKee Run 65,000 65,000 114 64,886 0.2% 65,000 65,000 114 0.2% In process Bids in Feb; Complete by June
Unit 11 Component Replacement @
30 EG1207 M Van Sant 50,000 50,000 44,915 5,085 89.8% 50,000 50,000 44,915 89.8% In process To be completed by 6/3012;
Switchyard Blast Walls @ McKee
31 EG1208 Run 50,000 50,000 5,442 44,558 10.9% 50,000 50,000 5,442 10.9% In process To be completed by 6/3012;
32 EG1209 M Building Preservation @ McKee Run 38,000 38,000 32,461 5,539 85.4% 38,000 38,000 32,461 85.4% In process Completion 6/12
Unit 3 Cooling Water Line Life
33 EG1210 M Extension 25,000 25,000 - 25,000 0.0% 25,000 25,000 - 0.0% Defer to FY13
34 EG1211 M Unit 3 Stack Repairs 25,000 25,000 9,693 15,307 38.8% 25,000 25,000 9,693 38.8% In process Completion 6/12
35 EG1212 M Unit 3 Turbine Inspection 1,021,000 348,000 198,962 149,038 57.2% 348,000 348,000 198,962 57.2% In process Will complete Spring outage;
Work complete, transferred
36 EG1213 M Unit 3 Aux System Components 542,000 113,000 47,682 65,318 42.2% 113,000 113,000 47,682 42.2% In process funding to EG1212
37 EU1201 R Distribution Upgrades 500,000 500,000 354,770 145,230 71.0% 500,000 500,000 354,770 71.0% In process On-going
38 $ 5,962,300 $ 4,014,553 $ 2,484,331 $ 1,530,222 0.0% $ 4,014,503 $ 3,990,053 $ 2,484,331 62.3%
39
40 Grand Totals $ 7,136,700 $ 4,982,693 $ 3,251,894 $ 1,730,799 17.3% $ 4,293,913 $ 4,356,508 $ 2,689,801 61.7%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
B = Bonded Project
S = State fully or partially reimbursed project
Page 140
FUND SUMMARY
Total Collected
$770,211.46
DEMEC Admin Fee Paid $30,215.03
State Admin Fee Paid $17,752.88
Grants Paid $506,767.00
Customer Only Grants/Fees Reserved and Amount Owed $22,415.50
Community Project Funds Requested $367,050.00
Energy Depot Paid $36,596.21
Efficiency Programs Paid $34,068.34
Solar Electric Power Association (SEPA) Fee $2,158.81
*Unencumbered Funds Available $2,811.22
Funding Shortfall
Current Grant Payment Delay (Months) 0.0
* As of 06/05/2012
GRANTS PAID
Grant Amount Review Fee Amount
Date Grant Paid Applicant Type
Paid Paid Owed
9/21/2007 Laura Drew Kelly Geo - Res $ 3,000.00 $ 225.00 $ -
12/5/2007 Domingo Reye Solar - Res $ 12,762.50 $ 750.00 $ -
4/16/2008 Lakeland Commercial Group Geo - Comm $ 10,800.00 $ 750.00 $ -
6/19/2008 & 08/25/2008 L.D. Shank - Triad Farms Solar - Comm $ 30,000.00 $ 750.00 $ -
10/6/2008 City of Dover Solar - Comm $ 40,820.00 $ 750.00 $ -
10/21/2008 Robert & Cynthia Hartman Geo HP- Res $ 1,800.00 $ 135.00 $ -
10/21/2008 Robert Varipapa Geo HP- Res $ 2,400.00 $ 180.00 $ -
2/27/2009 David Jump Solar - Res $ 15,000.00 $ 750.00 $ -
2/27/2009 Jakob Seren Solar - Res $ 15,000.00 $ 750.00 $ -
2/27/2009 William Sweet Solar - Res $ 15,000.00 $ 750.00 $ -
3/31/2009 LD Shank - Triad Farms Solar WH-Comm $ 3,000.00 $ 225.00 $ -
3/31/2009 Warren & Joan Seaver Geo HP- Res $ 3,000.00 $ 225.00 $ -
4/22/2009 William Sweet Solar HW $ 3,000.00 $ 225.00 $ -
4/28/2009 State of DE/DNREC - DE National Solar - Comm $ 30,000.00 $ 750.00 $ -
4/29/2009 Delaware Primary Care, LLC Solar - Comm $ 30,000.00 $ 750.00 $ -
9/11/2009 NCALL Solar - Comm $ 30,000.00 $ 750.00 $ -
9/11/2009 D. Brian Beckman Geo HP- Res $ 2,000.00 $ 150.00 $ -
9/21/2009 LKSC Dover, LLC Kids Cottage Solar - Comm $ 29,925.00 $ 750.00 $ -
10/5/2009 Mark F. Boller Geo HP- Res $ 3,000.00 $ 225.00 $ -
10/5/2009 John Welgan Solar - Res $ 15,000.00 $ 750.00 $ -
11/4/2009 LKSC Dover, LLC Kids Cottage Geo - Comm $ 12,000.00 $ 750.00 $ -
3/25/2010 Minaxi Patel Solar - Res $ 15,000.000 $ 750.000 $ -
3/23/2010 J. McGiffin Jr. & K. Doyle Geo HP- Res $ 3,000.000 $ 225.000 $ -
5/28/2010 Nancy Warner Geo HP- Res $ 1,200.000 $ 90.000 $ -
6/2/2010 David Teel Geo HP - Res $ 1,800.000 $ 135.000 $ -
6/2/2010 Dewey J. Barich Geo HP- Res $ 2,400.00 $ 180.000 $ -
7/12/2010 Mike & Sharonb Laverty Solar - Res $ 5,105.000 $ 382.880 $ -
8/19/2010 James Grilli Geo HP- Res $ 1,800.00 $ 135.000 $ -
8/19/2010 Michael Noble Solar - Res $ 15,000.000 $ 750.000 $ -
9/17/2010 David Teel Solar - Res $ 7,500.000 $ 562.500 $ -
3/8/2011 Michael & Carol Apgar Solar - Res $ 7,500.000 $ 562.500 $ -
3/17/2011 Elizabeth Murphey School Geo HP - Comm $ 9,200.000 $ 690.000 $ -
5/24/2011 Richard Avant Geo HP - Res $ 2,400.000 $ 180.000 $ -
6/23/2011 Charles Messina Plumbing Solar - Comm $ 10,000.000 $ 750.000 $ -
10/4/2011 Charles Bounds Geo HP - Res $ 1,800.000 $ 135.000 $ -
3/29/2011 Psychiatric Access Central DE Solar - Comm $ 13,187.500 $ 750.000 $ -
7/8/2011 Michael J. Kopp Geo - Res $ 2,300.000 $ 135.000 $ -
10/17/2011 City of Dover ** Geo HP $ 48,267.000 $ -
3/7/2012 Ruth Ann Piper Geo - Res $ 1,200.000 $ 90.00
3/7/2012 Robert Hall Geo - Res $ 3,000.000 $ 225.00
3/7/2012 Elizabeth Murphey School Geo - Comm $ 13,800.000 $ 750.00
3/7/2012 Elizabeth Murphey School Geo - Comm $ 12,000.000 $ 750.00
3/7/2012 Elizabeth Murphey School Geo - Comm $ 5,400.000 $ 405.00
3/7/2012 Elizabeth Murphey School Geo - Comm $ 1,800.000 $ 135.00
3/7/2012 Elizabeth Murphey School Geo - Comm $ 10,200.000 $ 750.00
3/7/2012 Frank Daniels Geo - Res $ 4,400.000 $ 330.00
(**$$ still available for future apps.)
Total $ 506,767.00 $ 17,752.88 $ 3,435.00
ARRA RELIEF GRANTS PAID
6/10/2011 Arturo Sanchez Solar - PV $ 7,500.00
10/19/2011 John Diamond Enterprise LLC Solar - PV - Com $ 30,000.00
10/19/2011 John Diamond Enterprise LLC Geo HP - Com $ 10,000.00
Total $ 47,500.00
PENDING APPLICATIONS
Applicant Grant Reservation
Date Reserved Type
Request Review Fee
Reservation Approval Pending ABRA Associates, LLC Solar - PV - Com $10,770.00 $750.00
Reservation Approval Pending Delaware Tech Solar - PV - Com $6,940.00 $520.50
Total $ 17,710.00 $1,270.50
ENERGY DEPOT FEES
3/3/2008 Start-up Fees $5,872.50
4/15/2008 Start-up Fees $1,957.50
4/15/2008 Mar, Apr, May 2008 $1,692.13
Page 141
7/22/2008 June, July, Aug 2008 $1,692.13
10/10/2008 Sept, Oct, Nov 2008 $1,692.13
1/2/2009 Dec 08, Jan, Feb 2009 $1,692.13
4/3/2008 Mar, Apr, May 2009 $1,692.13
7/1/2009 June, July, Aug 2009 $1,692.13
9/11/2009 Sept, Oct, Nov 2009 $1,692.13
1/4/2010 Dec 09, Jan, Feb 2010 $1,692.13
3/29/2010 Mar, April, May 2010 $1,692.13
6/30/2010 June, July, Aug 2010 $1,692.13
10/4/2010 Sept, Oct, Nov 2010 $1,692.13
1/3/2011 Dec 2010, Jan, Feb 2011 $1,692.13
4/5/2011 Mar, Apr, May 2011 $1,692.13
7/8/2011 June, July, Aug 2011 $1,692.13
10/4/2011 Sept, Oct, Nov, 2011 $1,692.13
1/3/2012 Dec 2011; Jan, Feb 2012 $1,692.13
4/5/2012 Mar, Apr, May 2012 $1,692.13
Total Paid $36,596.21
ENERGY EFFICIENCY CAMPAIGNS/EDUCATION PROGRAMS
1,500 CFL Campaign & Educational
10/21/2008 Literature $5,012.29
12/11/2008 Reimbursement for Green $3,459.12
Thermal Imager for Home Audits
3/31/2009 Program $5,581.12
Eco @ Home Energy Conserv.
1/4/2011 Calendars $20,015.81
Total $34,068.34
Dover Library Commuity Grant Project
Collections
$5,021.15 1/2 of Oct 2009 GEF Payment
$4,783.94 1/2 of Nov 2009 GEF Payment
$4,813.23 1/2 of Dec 2009 GEF Payment
$5,454.02 1/2 of Jan 2010 GEF Payment
$5,147.49 1/2 of Feb 2010 GEF Payment
$4,897.69 1/2 of March 2010 GEF Payment
$3,976.14 1/2 of April 2010 GEF Payment
$5,638.90 1/2 of May 2010 GEF Payment
$5,645.35 1/2 of June 2010 GEF Payment
$6,590.60 1/2 of July 2010 GEF Payment
$7,786.09 1/2 of August 2010 GEF Payment
$6,415.31 1/2 of Sept 2010 GEF Payment
$5,327.96 1/2 of Oct 2010 GEF Payment
$4,787.73 1/2 of Nov 2010 GEF Payment
$4,939.75 1/2 of Dec 2010 GEF Payment
$5,452.55 1/2 of Jan 2011 GEF Payment
$5,410.35 1/2 of Feb 2011 GEF Payment
$4,646.32 1/2 of March 2011 GEF Payment
$4,742.22 1/2 of April 2011 GEF Payment
$4,702.48 1/2 of May 2011 GEF Payment
$5,664.97 1/2 of June 2011 GEF Payment
$6,430.15 1/2 of July 2011 GEF Payment
$6,916.50 1/2 of Aug 2011 GEF Payment
$6,149.31 1/2 of Sept 2011 GEF Payment
$5,243.92 1/2 of Oct 2011 GEF Payment
$4,829.91 1/2 of Nov 2011 GEF Payment
$4,531.81 1/2 of Dec 2011 GEF Payment
$4,990.50 1/2 of Jan 2012 GEF Payment
$5,071.81 1/2 of Feb 2012 GEF Payment
$4,828.32 1/2 of March 2012 GEF Payment
$4,857.07 1/2 of April 2012 GEF Payment
$0.00 1/2 of May 2012 GEF Payment
1/2 of June 2012 GEF Payment
1/2 of July 2012 GEF Payment
1/2 of Aug 2012 GEF Payment
1/2 of Sept 2012 GEF Payment
1/2 of Oct 2012 GEF Payment
1/2 of Nov 2012 GEF Payment
1/2 of Dec 2012 GEF Payment
$165,693.47 Total Collections
Total Dover Lib. Draws to Date
$48,267.00 10/17/2011
$117,426.47 Total Funds Available for Draw