COUNCIL COMMITTEE OF THE WHOLE
The Council Committee of the Whole Meeting was held on March 28, 2017 at 6:00 p.m., with
Council President Slavin presiding. Members of Council present were Mr. Anderson (arrived at
6:13 p.m.), Mr. Neil, Mr. Cole, Mr. Hare, and Mr. Hutchison. Mr. Sudler and Mr. Lewis were absent.
Mayor Christiansen was also present (departed at 7:41 p.m. and returned at 7:52 p.m.). Civilian members
present for their Committee meetings were Ms. Arndt and Mr. Blakeman (Utility), Mr. Caldwell
(Parks, Recreation, and Community Enhancement), Mr. Keller and Mr. Shelton (Safety Advisory
and Transportation), and Mr. Shevock and Dr. Stewart (Legislative, Finance, and Administration).
Mrs. Horsey (Parks, Recreation, and Community Enhancement) was absent.
UTILITY COMMITTEE
The Utility Committee meeting was held with Chairman Cole presiding.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda, seconded by Mr. Blakeman and
unanimously carried.
Presentation by Central Delaware Chamber of Commerce - Vision 2020 for Dover - Item #7
Members were provided a letter from Ms. Janie Libby, Chairman of the Board, Central Delaware
Chamber of Commerce (CDCC) dated February 22, 2017 regarding the Electric Utility
(Attachment #1). Ms. Judy Diogo, President, CDCC, advised that the letter asked for a specific task
force to be developed to review the opportunity or options for the City to possibly sell its electric
utility. She explained that, in 2009, some members of the CDCC who were large utility users
expressed concern with their electric rates and met with the leadership of the City, including former
Mayor Carleton Carey; Mr. Tony DePrima, former City Manager; and Mrs. Beverly Williams,
former City Council Representative. Ms. Diogo indicated that the CDCC hosted workshops at
which the Delaware Electric Cooperative presented their option of buying the utility from the City.
She noted that shortly after that presentation, the CDCC signed up with a company called CQI and
began allowing those members who could to become part of a small electric cooperative through the
CDCC to save money. Ms. Diogo estimated that approximately 17 members signed up for that
program. She explained that currently the CDCC has a different program with Infinity Energy
Services, and seven (7) members are currently signed up in that small electric cooperative.
Ms. Diogo explained that the initiative taken in 2009 or 2010 lost its momentum, and in 2015 some
members who were large users approached the CDCC with concerns about their rates. She stated
that the CDCC met with Mr. Scott Koenig, former City Manager, and Mr. Harry Maloney, Electric
Director, set up a small electric buying group, and started meeting with the City on a regular basis
to try to determine how to help these members and the City, noting that they were trying to find a
win-win situation. She explained that these meetings had continued, and meetings with Mr.
Maloney and the City’s Key Accounts associate occur approximately three (3) times per year. Ms.
Diogo advised that positive things had come out of the meetings, noting that people had come to do
electrical inspections and surveys. She stated that members had tried to change things, such as light
fixtures or operation hours, so that they are not using the bulk of their energy during the peak time
for the City.
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 2
Ms. Diogo indicated that the CDCC’s purpose for being present was to try to move forward their
recommendation to establish some type of task force to assist the City in looking at opportunities
for the utility.
Ms. Janie Libby, Chairman of the Board, Central Delaware Chamber of Commerce, advised
members that she is the Vice President of Human Resources for Dover Downs Hotel and Casino and
Dover International Speedway. She indicated that the energy consumption for Dover Downs and
Dover Speedway is enormous, and they are extremely interested in anything that they can do to
reduce their expenses. Ms. Libby stated that, with the highest casino tax rate in the nation, Dover
Downs must do everything they can to be prudent about expenses so that they can compete with the
neighboring states of Pennsylvania, Maryland, and New Jersey. She noted that in 2016 their electric
bill exceeded $2.1M, stating that it was no secret that Dover’s electric rates are significantly higher
than those of any of their neighbors, including the other two (2) casinos in Delaware with which they
compete. Ms. Libby stated that this increases their operating expenses, leaving less money to
reinvest in their facility. She indicated that, in order to stay competitive, they must invest in capital
improvements, and their hotel is in need of refreshing. Ms. Libby advised that this is typically done
every five (5) years and they were now past eight (8) years, noting that the carpeting, painting,
linens, draperies, and operating systems needed to be upgraded, refreshed, or repaired. She
explained that if they do not provide an attractive place to visit, customers will be less inclined to
come because they have other options. Ms. Libby stated that Dover Downs employs hundreds of
Dover residents and hopes to continue doing so; however, labor needs are directly related to business
levels, and lowering electric rates would go a long way toward helping them stay competitive and
successful.
Mr. Scott Kidner, Vice Chair, Legislative Affairs, CDCC, advised that they had been present when
City Council had a working group a few months ago, and the CDCC was there to begin a
conversation as to whether the City of Dover should remain in the electric utility business. He noted
that this issue was not without controversy or a fair amount of concern and recognized that the City
of Dover had a lot invested within this silo. Mr. Kidner advised that the Chamber’s point of view
was twofold, and the first was to offer the CDCC as an opportunity to help facilitate a movement
forward to look at whether the sale of the utility to a third party should be considered. He indicated
that it was not the Chamber’s job to become a complete advocate or to say that the sale must be
done, and only City Council and the leadership of this City could make that decision. He stated that
the CDCC was present to ask the City to form the group referenced in Ms. Libby’s letter with the
players that were identified. Mr. Kidner stated that the Chamber’s second request was that this
process begin soon, while recognizing the City’s issues with internal timing related to the loss of the
City Manager and upcoming loss of the Director of Planning. He indicated that, nonetheless, the
Chamber thought that now was the time to put the interested parties together to allow them to help
facilitate and open a broad discussion about whether this would make sense for the City of Dover.
Mr. Kidner stated that there were many players and various interests, and some thought this was a
bad idea for the City while others thought that this was direction the City must go.
Mr. Kidner explained that the utility issue being discussed tonight was just one (1) of several
recommendations from the CDCC covering a multitude of issues, as contained in the Vision 2020
document. He stated that the CDCC was available to help facilitate, answer questions, enter a
Page 3
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 3
broader discussion, or set up a potential opportunity to come before members again in a different
light.
Mr. Neil stated that he was a great supporter of Dover Downs, noting that they are a great neighbor
in every respect and stated the desire to lower their rates, as had been done with programs for Kraft
and others. He indicated that, unless the State of Delaware would let Dover Downs keep profits, the
life of Dover Downs would not change. Mr. Neil advised that the City could help, but this would
not be all the help the organization would need. He expressed the need to keep some of their profits,
the more the better. Mr. Neil stated that he did not know how to provide not only for business but
for the residents, who have some of the lowest rates and sometimes the lowest rates in the State, and
that he would make sure that the City has the capacity to do this. He advised that he would look to
protect the people of this community to keep the rates low and also do what he could to help the
businesses and keep their rates low.
Mr. Kidner stated that this was understood and that this is why the CDCC started this conversation.
He reiterated that ultimately the decision belongs in Council’s plans. He indicated that, from Dover
Downs’ point of view, he did not disagree, stating that this had been discussed at Legislative Hall.
Mr. Kidner noted that Dover Downs’ tax rate was clearly the most significant issue they were facing;
however, if there was an opportunity for the City of Dover to reduce their cost or somehow add to
their ability to be competitive, this was what the Chamber was asking. He asked that members take
this under serious debate and consideration, not only for Dover Downs, but for the Chamber’s many
other business members who purchase electricity from the City. Mr. Kidner indicated that this issue
had been discussed and backed away from a number of times, and they were standing before
members to ask them to not back away and to make a decision. He reiterated that Council would
ultimately be making the decision.
Mr. Slavin expressed appreciation for the dialogue, stating that dialogue proves healthy, regardless
of the outcome, if everyone agrees that they will be sincere, ethical, and transparent about how to
proceed with the dialogue, and he expected that they would. He noted that the decision to get into
the electric utility by the City of Dover when rural electrification was making its way down the
Peninsula was a 100-year good decision. Mr. Slavin advised that the City adopted this decision for
the residents; however, someone who was visionary realized that if the City sold to more people than
were living in the City, it would balance taxes out and the City would have a very low tax rate. He
indicated that this good decision had been echoed a few times since then, noting that
Mayor Christiansen had been serving as Council President at a time when energy was coming into
the City. Mr. Slavin indicated that this had been another generational good moment and a good deal
for the City. He explained that the utility at that time generated electricity and the City transmitted
it; however, in the current 21st century model for the municipal utility, the City does very little
generation. Mr. Slavin advised that the City is in a very complicated market, and buying futures and
buying prices is a very complex and delicate business that can be very risky if the City is not up to
the challenge. He stated that he was glad for the dialogue and supported it; however, he asked the
CDCC to understand that there will be multiple bottom lines for the City. Mr. Slavin noted that the
City’s financial bottom line is that if the City gets out of the utility business and sells it, it would
have to net enough so that property taxes would not be affected. He noted that it would be of no
value to anyone to pay a lower electric bill and a higher tax bill that nets out more. Mr. Slavin stated
Page 4
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 4
that the City is on the dole for a $10M transfer each year from the electric utility that offsets
property taxes, so this must be figured out somewhere in the calculations coming out on the other
end.
Mr. Slavin advised that there is also a human capital or a people bottom line, noting that Council
Chambers was full of men and women who put their lives on the line to do electric work, and they
had done this outside his home a few times. He cited an incident when a tree fell down at 2:00 a.m.
and knocked out power to his entire neighborhood when it was very cold, and staff worked all
through the night. Mr. Slavin expressed the need to begin with the principle that no employees
would be harmed and they would have positions at the end of the day if a path is chosen.
Mr. Slavin noted that there is also a social bottom line in that the City must communicate this issue
from this moment forward and be transparent, the issue must be understood, and the position chosen
must be defensible, and if this is done he thought there would be a healthy dialogue.
Ms. Diogo clarified that the CDCC was present tonight to see if a task force could be developed so
that an investigative process could be started. She stated that they were not asking for decisions but
to see if this step could be taken. Ms. Diogo indicated that this would be a beneficial step for
everyone because it would provide information to Council, the community, and the users of
electricity. She reiterated that they were asking for a potential motion this evening to move forward
in establishing a task force to do the investigation.
Mr. Slavin expressed his understanding, stating that a journey of 1,000 miles begins with a first step.
Mr. Anderson stated that he was on board with nine (9) of the 10 proposals that the CDCC had
provided but was not in favor of this proposal at this time unless someone had enough interest with
enough money, noting that anything is for sale as far as he is concerned. He advised that he has a
friend in an engineering firm who does this type of work for a living, and who looked at the public
information available and did an evaluation for Mr. Anderson as a favor. He indicated that this
individual came back a few days later with some numbers, which Mr. Anderson did not want to state
publicly and start a negotiation; however, his friend had noted that the offers out there were not
worth doing now and would not work financially. Mr. Anderson stated that his friend advised that
the concept was not unreasonable, but the numbers must be at least 50% above what everybody was
talking about because it would not make sense otherwise, noting that this was true all over the world.
Mr. Anderson indicated that the City had a study that cost hundreds of thousands of dollars that
came back with basically the same numbers that his friend provided on the back of an envelope,
which made Mr. Anderson wonder about doing more studies.
Mr. Anderson expressed concern about moving forward now until the City knows what the changes
are in the regulatory environment. He noted that Washington, DC is currently changing the dynamic
that had existed just a year ago, and the President had just signed some executive orders earlier in
the day that would change the viability of keeping the utility more toward the City’s favor.
Mr. Anderson indicated that, with the current dynamic, he would personally want to see things shake
out for at least a year to see what regulations are developed for these executive orders. He stated
Page 5
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 5
that, without this, the City would be shooting in the dark, and he did not see a point to any studies
until that information is available.
Mr. Kidner stated that Mr. Anderson’s example could be used as a reason to start now, noting that
the regulatory environment was changing, and this would require the City to be flexible, nimble and
aggressive in understanding what those changes are, and he believed that now was the time to start
to examine whether this should be done. Mr. Kidner noted that the conclusion may be that this
would not be worth it and there are no third party providers out there or utilities willing to pay the
numbers needed; however, it would be nice to get to the table, have paper moving back and forth
between the two (2) bodies, and begin an earnest negotiation.
Mayor Christiansen expressed appreciation for the CDCC’s effort in being present; however, he
stated that he had reservations, noting that he had been through this before. He noted that there were
a lot of people and jobs, and the future of the City was riding on what transpires from this
Committee and on which direction the City goes. Mayor Christiansen advised that former Mayor
Crawford Carroll was a great advocate of the City of Dover being in the utility business and having
enterprise funds which subsidized the City, and out of respect for him, Mayor Christiansen stated
that he thought this was something that should be looked at. He was unsure if the CDCC’s
committee would be the right direction, noting that there was a mechanism that had been used in the
last go-round when he was serving as Council President. Mayor Christiansen stated that, whatever
direction was chosen, several models should be looked at before proceeding so that there is a fair
and just assessment of the direction the City needs to go. He advised that the City would take into
account that the Chamber stepped forward and offered to help. Mayor Christiansen expressed the
need to act very deliberately, noting the desire not to damage any of the CDCC’s members or the
City of Dover today or in the future.
Mr. Hutchison thanked the Chamber, stating that he could not think of anyone he would rather be
partners with than the CDCC when looking to the future of what is in the best interest of the City
of Dover. He indicated that the City had some in-house issues to deal with before beginning this
relationship, noting the need to get a management team in place, hold an election in April, and hold
a special election in May. Mr. Hutchison urged that the City get its team in place so that there could
be a vision and understanding of where to go; however, he advised that he could not say enough
about looking at partnership between the CDCC and the City of Dover on this very critical issue.
Mr. Kidner indicated that if only a couple more weeks were needed, the Chamber would accept that.
Mr. Hare stated that he thought the task force list was fine and good; however, there was a lot more
to this issue, noting that there were two (2) separate parts that included transmission and distribution.
He explained that he had grown accustomed to having his lights, heat, and air come on when he
needs them. Mr. Hare stated, in regard to generation, that the City pays a very high price to have
someone run the plant, and he had never been a big advocate of this because he thought there were
people capable of running the plant that could save $7M. He indicated that the plant does not
generate enough electricity to supply power to the City if the grid went down, and a lot of people
would be out of electricity. Mr. Hare noted that he likes having his lights on, and the employees do
a good job of this.
Page 6
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 6
Mr. Hare stated that he thought the City was pouring good money after bad in regard to generation,
and was waiting for an accident to happen that would cost an arm and a leg. He indicated that there
were a lot of things to look at before making a decision on what would be done. Mr. Hare advised
that if the City was going to be in the electric business, it should be in the electric business and not
pay someone $7M to run an operation when the City has people that could do this.
Ms. Diogo reiterated that the CDCC was not present to advocate for the sale of the utility but to
advocate for research to take a look at it, and they were also present because the City of Dover is
a member of the Chamber. She stated that an important part of the reason that the CDCC prepared
the Vision 2020 was because they want to protect and be a good partner for the City. Ms. Diogo
reiterated that there were nine (9) different recommendations, and this was just one (1). She noted
that this matter was being brought to the Utility Committee; however, they would be happy to talk
with City Council about the recommendations. Ms. Diogo explained that the CDCC was trying to
make Dover as economically viable as possible, so that the companies that are here and the
businesses that they were trying to attract could be competitive in today's market.
Mr. Neil stated that during the City Council Retreat of January 6, 2017, he had two (2) top long-term
items, and the second was what would be done about electricity, because a decision must be made.
He stated that he was more concerned about how to lower the cost, as opposed to whether the City
gets rid of it or runs it. Mr. Neil noted he was very impressed by the CDCC’s report and that the
City has to make things better for them and for people coming in, stating the desire to get more
people in so that they can spend more money. He noted that the economic issue was his other
concern during the Retreat. Mr. Neil stated that he had served as press officer for the Mayor during
the renaissance of the City of Baltimore, people had come to Baltimore, and he wanted the same for
the City of Dover. He indicated that he is a supporter of the Chamber; however, he was unsure if
their proposal would be the way to go. Mr. Neil advised that much of what they had included was
well thought out and had to be done, and there was no question about this having to be done in
partnership. He indicated that there were many good ideas included; however, he agreed with
Mr. Anderson’s concern. Mr. Neil stated that if a way could be found to get rates down, it would
be better for the Chamber and for the City, and he would do anything he could to help Dover Downs.
Mr. Blakeman commented that there had been discussion about finances and costs, noting that
Mr. Hare had mentioned reliability, and asked if there were any other underlying issues.
Responding, Ms. Diogo advised that the CDCC had primarily heard about cost, which comes down
to competition with other companies, particularly in the manufacturing industry. She noted that
companies may have a plant in Dover and a plant in South Carolina and, when sitting down at their
corporate table looking at operating expense, they find expenses that are out of line. Ms. Diogo
stated that the question arises about whether Dover is the place they really want to be if they are
looking to invest more money in a plant and, since Dover’s expense size has increased, they may
consider going to South Carolina. She indicated that the CDCC was trying to assist them by doing
what they can to lower rates or find out how they can be served in Dover and make it possible to be
more competitive within their own corporations.
Mr. Blakeman questioned if they had developed a target cost that they needed to have within that
structure, or a range that they needed. In response, Ms. Diogo advised that this is part of what the
Page 7
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 7
CDCC had done with the electric group, noting that some of those seated at the table could provide
the rate they are paying in another state and what they are looking for. She stated that these people
had been worked with and she thought they would be willing to share this information with
members. Ms. Diogo stated they were unsure if they could share information in a public forum, but
they could do so with the Utility Committee, and she noted that Mr. Harry Maloney, Electric
Director, would also know this information, as he had attended those meetings. She stated that
Mr. Maloney had been helpful in finding members grant money, some had been helped with audits,
and Dover Downs went through a tremendous refit on all their lighting fixtures, so these ways of
helping were being exhausted. Ms. Diogo indicated that the Chamber was trying to find out if there
was another way that would be beneficial to businesses, the City, and to everyone else.
Mr. Cole stated that it was realized that the commercial rate issue was the driving force.
Mrs. Donna Mitchell, Acting City Manager, expressed the desire to provide context to the
conversation and noted that Dover’s utility transfer is 12.3% of electric revenues and 23.7% of
General Fund revenues. She explained that every one (1) cent of a tax increase equals 2.5% in a
property tax billing increase, and 30% of the tax space is tax exempt. Mrs. Mitchell noted that the
City’s current Power Cost Adjustment (PCA) credit was approximately 2.2%, or $1.8M in electric
revenues that were credited back to the customers. She stated that from FY 2011 through FY 2014,
electric rates were reduced by approximately 18.2% outside of the PCA credit, mostly attributed to
the reduction the City is getting in power supply cost.
Mrs. Mitchell advised that the local government has the ability to direct both physical and financial
resources for the betterment of the community and its customers through providing reliable power,
excellent customer service, and managed cost. Mrs. Mitchell indicated that the City has local
employment, which provides economic benefits to the local businesses, and local control helped
Council to develop a business retention rate in the last year. She advised that the public utility
provides several benefits to the customers that are not quantified in the cost of service, such as the
in-kind contributions listed on page 14 of the article entitled “Benefits of Public Power.”
Mrs. Mitchell noted that this list reflected the same services that the City’s electric utility provides
to Dover residents. She indicated that, in order to address concerns by the City’s customers, she
proposed to complete the Organizational Analysis and Benchmarking study by an independent
consultant to ensure the utility’s future success. Mrs. Mitchell advised that this proposed study was
the next item on the evening’s agenda and would provide accountability and transparency to the
customers. She noted that the customers are the utility, and it was preferable to her to see if a
benchmarking study with a similar demographic profile to the City of Dover could be found.
Mrs. Mitchell indicated that an updated full cost of service study would address any customer load
profile changes and regulatory and energy market changes since the last time a full study was
completed. She stated that this would ensure equity among the customer classes based on customer
usage.
Mrs. Mitchell advised that one cannot just say that the City’s rate study is based on the revenue
requirement. She stated that, if the City goes forward based on today’s revenue requirement and it
is seen that there are concerns about the demand charges to the commercial customers being high,
this would shift the revenue requirement to another customer class, which would result in another
Page 8
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 8
customer class coming before members. Mrs. Mitchell explained that this was why she was
proposing that the studies be done.
Mrs. Mitchell advised that the City took its first step in looking at the future of the utility operations
with approval of the Integrated Resource Plan (IRP) to analyze future power supply needs. She
noted that Council approved inclusion in the task order for The Energy Authority (TEA) the
following:
Whereas, Dover desires to obtain the professional services of TEA for the purpose
of evaluating the City's existing generation resources and power supply contracts,
demographics, consumption patterns, and significant regulations impacting electric
utilities in order to prepare a comprehensive economic assessment in the form of an
Integrated Resource Plan ("IRP");
Whereas, Dover desires for TEA to prepare and present the IRP to assist the City in
providing reliable, competitively priced supply of electricity to its customers, as well
as provide economic benefits to the City;
Mrs. Mitchell explained that she had run the numbers for the budget in the last few years, and some
of them had impacted Dover Downs, who had concerns about their electric charges. She indicated
that the last time the City was ready to do a slight rate increase, she ran a comparative analysis for
the Chief Financial Officer at Dover Downs to show them what a tax increase would be versus an
electric rate increase. Mrs. Mitchell advised that, because of their massive land holdings, a tax
increase would have cost Dover Downs more than an electric rate increase.
Mr. Cole opened the floor for public comment.
Mr. Harry Maloney, Electric Director, informed members that he had been in the electric business
for 40 years, since attending college. He advised that last year the City received an award for utility
reliability, and he stated that he saluted the people seated behind him in the Council Chambers who
were able to provide that service to the customers of the City. Mr. Maloney advised that they know
what they are doing and are doing an excellent job. He explained that he came to the City out of
retirement to help the City move ahead for the future, and one (1) thing he did not have to worry
about was the lights staying on. Mr. Maloney indicated that the City has an excellent
interconnection and transmission system, noting that the distribution system is 60% underground,
and growing every day as the City gets rid of backyard construction. He stated that no one had
fences or sheds in their backyards when the system was built in the 50s and 60s, and now one cannot
even walk down where the pole lines are. Mr. Maloney advised that replacements are needed, and
through budget appropriation, staff was continuing to improve reliability and put the system
underground and move it out front to the street.
Mr. Maloney stated that the City has an aging generation facility and a fairly new jet engine and the
City can restore power if the transmission goes down. He noted that the unit will start up in a black
start and is tested occasionally, and once that unit is on the City can restore 40 MW. Mr. Maloney
indicated that today they could probably put half the load back within 15 minutes. He noted that it
Page 9
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 9
takes a little more time to do switching, but as soon as the 100 MW unit comes up online, within
eight (8) hours they could restore the rest of the power to the City. Mr. Maloney advised that for
a few hours in the summer with the load at approximately 150 MW, the City might be short a little
bit, but 99% of the year the City is fine. He indicated that in an area just north of the City in New
York and in the Great Lakes area power went down for days in 2003.
Mr. Maloney stated that the City has a good utility. In regard to what the CDCC had said, he
indicated that if the utility had terrible reliability, the rates were through the roof, the infrastructure
needed millions in improvements, and the plant was falling apart, it would be time to stop rather than
investing $150M in the system. Mr. Maloney advised that this was not the case and revenues were
healthy. He stated that, in March, $6M in revenue was transferred into reserve accounts and $5M
of Other Post-Employment Benefits (OPEB) obligation was transferred from the City’s General
Fund to the utility, noting that some of the OPEB obligations were for City employees who work
for the utility. Mr. Maloney advised that he had gone through the rate study with Mrs. Mitchell and
the City has flat rates. He noted that most utilities have summer and winter inversion rates, time of
day rates had been around for 20 plus years, and more can be done with this with new metering. Mr.
Maloney stated that the Co-op does not have a demand rate but has a different daytime/nighttime
rate, which to him was like a demand rate in consumption. Mr. Maloney advised that all of these
things would be looked at.
In regard to revenue, Mr. Maloney indicated that the City was doing very well this year and
revenues were outpacing expenses, so the City had the clay to model something to help what was
being asked for once the first draft of the IRP is received. He informed members that
President Trump had signed documents indicating that the Clean Air Act would be forgotten, and
this would be a factor. Mr. Maloney stated that staff had not wanted to do all the studies assuming
that the Clean Air Act was going to occur and then have all the studies become obsolete. He advised
that the IRP would be a process, with a mechanism to constantly go through a decision tree and
revisit the plan, and noted that most IRPs are revisited every two (2) years.
Mr. Maloney reminded members that the City had made a power purchase with Calpine of capacity
for five (5) years starting next June 1st. He indicated that this would give time to analyze, see how
things move, and harvest the value of the capacity. Mr. Maloney estimated that Unit #3, a 100 MW
unit, had approximately 10 more years, noting that it had just been overhauled and was running and
doing well. He advised that the combustion turbine (CT), which was a 1992 or 1993 unit, was due
for its first major overhaul in 25 years, based on starts and run times, noting that there had been
small overhauls here and there. Mr. Maloney reiterated that the utility was very healthy and he
thought that there was enough material to work with on rates to begin to get competitive. He stated
his understanding that 30% or as high as 40% of the City’s tax base is non-taxable and questioned
where to reach out to cover capital expenses. Mr. Maloney stated that it is nice to be the State
capital; however, this is expensive, as had been seen through supplies, support, and police, and he
questioned where to go for revenue. He reiterated that the electric utility had been healthy and asked
members to imagine if the City had only one (1) pot to pull money from, noting that this much
money could not be taken from water utilities because the City could not pump this much water.
Page 10
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 10
Mr. Maloney stated that when the City has a good draft or final IRP, it should reach out to
constituents; however, it does not have this yet, noting that models were being run now. He
indicated that the City should have something shortly; however, two (2) or three (3) weeks were lost
due to the holidays, President Trump’s actions, and a hurricane that came up the coast. Mr. Maloney
expressed the need to work ahead and for employees to know if they will have a job tomorrow or
if the City will let the utility go. He noted that if this is dragged on, it will be difficult to hire and
to keep people with the City because they will want to know how stable the utility is. He questioned
Mr. Hare why it was necessary to not fill positions that are vacant for six (6) months without
approval, and asked how jobs would be filled if people were being chased away. He indicated that
the City cannot have all these poles up in the air and expressed the need to settle down, pick a path,
be firm with it, and move forward, and he stated that he thought the City could get there.
Mr. Maloney advised that everyone was invited to attend a Delaware Municipal Electric Corporation
(DEMEC) rate presentation on April 22, 2017, noting that the presenter had spoken previously, was
very good, and had done municipal rates. He indicated that this would provide a feel for what would
happen and how to move ahead and would allow CDCC to move forward and bring the concerns
of their consumers.
Mr. Anderson stated that there had been discussions in executive and special sessions, so
unfortunately he did not know if everyone knew how concerned Council had been with the need to
update commercial rates. He indicated that this was one (1) of the charges of Council due to
concerns that the City was not as competitive with rates in the C2 to C4 commercial area as it should
be, although it was very competitive in other areas and even had some of the lowest rates in the
State. Mr. Anderson expressed his hope that members of the CDCC would look over these rates and
hear these concerns, stating that he thought there would have to be an adjustment in order for the
City’s economic competitiveness to be what it should.
Mr. Maloney stated that when a cost of service study is done, it starts with a blank piece of paper
and the question is asked what it costs to serve a customer of a certain size. He indicated that the
wires, capacity, and load profile are reviewed. He noted that the peak occurs on July 15th, and this
is where capacity cost comes into play. Mr. Maloney stated that the costs of serving a small
customer, a Wawa store, or a little bigger industrial place, such as Uzin Utz, are each classified. He
advised that the number of hours for people in the call centers are determined, which helps to know
where the utility stands and if everybody is covering their weight. Mr. Maloney indicated that the
question can then be asked if residential service is getting a free ride from commercial. He stated
that most municipalities lay it on the commercial customers and take it easy on the residential,
noting that he was unsure if this is true in Dover and that the load was pretty heavy compared to
surrounding utilities.
Mr. Maloney advised that when the balance analysis is done, there will be no favoritism and the
costs will be determined and laid out. He advised that Mrs. Mitchell had a good Request for
Proposals (RFP) put together and the numbers would be reviewed to determine the cost. He
indicated that if there had to be movement, this would not be done in one (1) year. Mr. Maloney
explained that solar was another concern since the City would begin to lose revenue as solar
penetrates more, so the City would have to recover wire charges. He stated that solar users should
not get a free ride and should have to pay for basic wire service. Mr. Maloney indicated that the
Page 11
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 11
City had made the first move approximately 1½ or two (2) years ago and changed the basic
residential rate customer charge from $5.00 to $7.50, noting that it could go a lot higher in most
places, and the kWh would be lowered since this is revenue neutral. He noted that the solar users
pay a basic fee to have wires hooked to their houses so they can have power at night, and this is
buried in the kWh rate. Mr. Maloney advised that where he came from they now have over 35 MW
of solar, 16MW of it behind the meter, and the same size load of 150 MW peak load during the
summer. He stated that this hurts their revenue, but they are dealing with it and have a plan in place.
Mr. Cole thanked Mr. Maloney for helping to guide him and the Committee, noting that
Mr. Maloney had been fully able to answer any questions.
Mr. Scott Koenig, former City Manager, 243 Great Geneva Drive, stated that he had been a
residential customer of the City of Dover since June 1990, except for one (1) four-month period
when he lived with his in-laws. He noted that he is also an equity partner in a small business in the
City limits and, in his opinion, the City of Dover’s municipal utility is by far the best in the State.
Mr. Koenig advised that, with all of the issues in front of members, the advantages of having
generation, the quality of the system, and the quality of the personnel working for the City, the City
has the best utility right now and, with a few more improvements, the City would take a few more
steps to being even better than the competition around it. He indicated that he did not think that
there was anything that could be done in the decision-making process that would make the
discussion of the utility less complex. Mr. Koenig stated that the discussion to actually evaluate the
utility was probably even more complex than running the utility. In his opinion, what the Chamber
had asked was a significant waste of time and would distract the City from continuing to provide a
very high level of service, not just to the residential customers, but also to the business customers.
Mr. Koenig noted that the electric rate is really a simple function of the numbers for many business
customers and does not drive whether someone will start or give up a business in the City. He
advised that many service businesses like Wawa are driven primarily by traffic, the zip code, and
the amount of cars running in front of the piece of land, and not so much by the electric rates.
Mr. Koenig stated that a few businesses are extremely sensitive to the electric rate and expressed
the need to address them; however, he stated that they would be addressed by the efforts in the cost
of service study. He stated that he thought the answer to the Chamber’s request should be simply,
no, thank you.
Mr. Cole thanked the Chamber for their presentation and everyone for their comments.
Proposed Studies for the Electric Utility
Mrs. Donna Mitchell, Acting City Manager, advised that two (2) proposed studies were being
considered: 1) an Organizational Analysis and Benchmarking Study by an independent consultant
to include the best practices and possible areas for improvement; 2) an updated full Cost of Service
study to include rate design and street lighting with recommendations on changes to the current
components of the City’s electric rates. She explained that both of these studies would take place
in unison, and one (1) of the reasons that she proposed the Organizational Analysis and
Benchmarking Study was based on conversation and research from the American Public Power
Association (APPA). Mrs. Mitchell explained that they had stated that if a utility is not competitive,
there is a need to find out why. She stated that, from her prior comments earlier in the evening, she
had heard the customers loud and clear, noting that they had come to the City for the last three (3)
Page 12
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 12
or four (4) years. Mrs. Mitchell indicated the desire to ensure the success of the utility and thought
these two (2) items were necessary to take a deeper dive into what is done to run the business every
day, and to see if improvements can be made and recommended actions can be taken to control this
cost. She noted that one of the biggest cost drivers would probably be the General Fund transfer;
however, she did not know if this would be the only thing and stated the need to find this out.
Mrs. Mitchell indicated that this should be done with complete transparency for everyone’s benefit,
and doing these things would be acceptable to her if Council chose.
Staff recommended authorizing the Acting City Manager to solicit interest for Utility Professional
Services.
Mr. Anderson stated that he was skeptical about paying another six (6) figures for another set of
studies, noting that this had been done a lot recently and asked why this would be different. In
response, Mrs. Mitchell stated that the first study done by GAI Consultants, Inc. was a valuation of
the utility if it were sold and not a review of benchmarking and operations. She indicated that rate
studies had been done in the past but were not fully updated, noting that the rate study was updated
based on cost each year and not at all on the design. Mrs. Mitchell advised that this study would be
not only an update of the cost but also of the design, and would look at what is driving the load
profile by customer to make sure the design is equitable among customer classes and relevant to the
customer usage.
Mrs. Mitchell explained that she had contacted four (4) consultants and, from her discussions with
them, this was the high end cost. She indicated that if the cost was any more than this when the IRP
was done, she would bring it back to Council for approval. Mrs. Mitchell stated that Council would
still have a future opportunity to say no because she was planning to bring it back to Council.
Mr. Neil advised that, in light of the discussions this evening, he thought it would be extremely
worthwhile to have additional information that is transparent, and to make sure that everybody
understands what is being done and that Council is doing something and not just sitting on their
hands.
Mr. Neil moved to recommend authorizing the Acting City Manager to solicit interest for Utility
Professional Services, seconded by Mr. Hutchison.
Mr. Blakeman asked how the transfer from the Electric Department would be incorporated in the
rate study and if this was an integral part of the study. Responding, Mrs. Mitchell stated that this
was in the current study and would also be included in the next study. In regard to rates, she
explained that when a cost of service study is done it is not done just on the cost of service for
operations but includes the transfer, debt service, and depreciation, because assets must be replaced.
Mrs. Mitchell stated that all those variables are included and there is also a need to make sure at the
end of the day that revenues and expenses meet bond covenants. She noted that, while rates can be
reduced and money pulled from reserves, the revenues then are not meeting bond covenants because
they do not meet expenses. She stated the need to live within the means each physical year and that
this was something to keep in mind when preparing the budget.
Page 13
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 13
Mr. Blakeman asked if The Energy Authority (TEA) was doing the IRP study for the City and if
they are the City’s power supply contractor. Responding, Mrs. Mitchell indicated that they were.
Mr. Blakeman asked if they were evaluating themselves. In response, Mrs. Mitchell advised that
they were; however, she indicated that this argument had already been made and decided. She noted
that the City was involved on all sides of it; therefore, there were some checks and balances with
staff involved. In response to Mr. Blakeman, she stated that staff was reviewing how TEA reviews
this.
Ms. Arndt stated that she supported the idea of a comprehensive assessment from an independent
party to get information and looking for cost savings and efficiencies. She questioned if
Mrs. Mitchell had indicated that she did a Request for Proposals (RFP) and there were four (4)
consultants. In response, Mrs. Mitchell indicated that she did not do an RFP but contacted four (4)
consultants to determine what the pricing was for these two (2) studies. She stated that the
companies she contacted were UFS, Plante Moran, Baker Tilly, and Burns & McDonnell.
Noting that Mrs. Mitchell had talked to four (4) vendors, Mayor Christiansen questioned why a firm
RFP was not put out. Responding, Mrs. Mitchell advised that she did not want to put out a firm RFP
unless she knew Council wanted to move forward with this path.
Mayor Christiansen asked if these prices were negotiable once they come in or if Mrs. Mitchell had
leeway. Responding, Mrs. Mitchell indicated that if it were an RFP this would be negotiable. She
noted that there were two (2) components and she would take the approach that they could be split
if the vendors would provide a separate price; therefore, she may end up with two (2) different
consultants.
Mr. Hare asked if the four (4) companies that she had talked to had any ties to the City, and
Mrs. Mitchell responded that the only one with ties was Burns & McDonnell, who had done a cost
of service study in the past. She indicated that this did not mean that the City would have to use
them again.
The motion to recommend authorizing the Acting City Manager to solicit interest for Utility
Professional Services was carried with Mr. Anderson voting no.
Request for Alley Abandonment (Unimproved/Paper) - Between 29 North Kirkwood Street
and 434, 440, 442, 444, and 452 Fulton Street
Mrs. Donna Mitchell, Acting City Manager, advised that the City Clerk’s Office had received a
request from Central Delaware Habitat for Humanity for the abandonment of an unimproved alley
located between 29 North Kirkwood Street and 434, 440, 442, 444 and 452 Fulton Street extending
west to east from North Kirkwood Street to North Queen Street West Alley. Mrs. Mitchell
explained that the right-of-way for the unimproved alley is 10 feet wide, and half of the
right-of-way, or five (5) feet, would be conveyed to the owners of 29 North Kirkwood Street. She
noted that letters were sent to adjacent property owners to see if they were interested in participating
in the abandonment, and only one (1) owner of property adjacent to the northern portion of the alley
was interested. Mrs. Mitchell advised that abandoning the northern portion would create a difficult
maintenance task; therefore, abandonment of this portion was not recommended until all property
owners agree to the abandonment. She indicated that staff had no objection to the abandonment of
Page 14
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 14
the southern five (5) feet of right-of-way and recommended conveyance of five (5) feet of the
right-of-way to the property in conjunction with the provision of a public utility easement for each
parcel. Mrs. Mitchell advised that if other adjacent property owners expressed interest in the future,
staff would return to recommend abandonment of the northern side of the alley.
Staff recommended the following actions should the Committee be in favor: 1) abandonment of the
subject right-of-way with conveyance of the southerly five (5) feet of said right-of-way adjacent to
29 North Kirkwood Street, due to maintenance concerns; 2) the northern five (5) feet should not be
abandoned until all property owners agree to accept the land; and 3) adoption of a resolution by
Council setting a public hearing regarding the proposed abandonment for April 24, 2017.
Mr. Neil asked if there was a cost for abandonment and if the City would save any money.
Responding, Mrs. Mitchell indicated that there would be a cost savings because the City would not
have the inconvenience of going in on either side of the alley to try to maintain half of it. She
advised that abandoning one-half of the alley would be easier and more straightforward and would
avoid potential problems between property owners because one (1) has an additional five (5) feet
and the others do not.
Mr. Blakeman moved to recommend approval of staff’s recommendation, seconded by Mr. Neil.
Mr. Anderson stated that there were other locations in this area where the City owned only half of
unimproved alleys, and he did not think that it worked in the long run. He noted that eventually
there are complaints from people wanting to improve the alley or complaints about criminal
elements and other activity occurring. Mr. Anderson indicated that this never seemed to work and
that he would much rather see an all or nothing approach.
Mrs. Mitchell stated that she shared Mr. Anderson’s concern. She indicated that this matter was new
to her; however, abandonments had been done this way in the past. Mrs. Mitchell advised that she
was looking at staff efficiencies and had taken this approach for that reason. She concurred that this
had not been beneficial in the past; however, since one (1) property owner wanted the whole length
of the alley, she did not see a problem with abandoning that part of it.
Mr. Hare stated his understanding that property owners did not want to pay to abandon the northern
half of the alley. Responding, Mrs. Mitchell advised that there would be deed changes and legal
costs that she believed would be less than $500. Mr. Hare questioned if it would be more beneficial
for the City to pay for this and give the property owners this land so that the City would no longer
have to worry about it. He indicated that if the alley was split in half, the City would still have to
somehow get down it to maintain it. Responding, Mrs. Mitchell explained that if the City paid, this
would be setting a precedent and the City would then have to do this for everyone requesting an
abandonment.
Mr. Dan Simpson, Executive Director, Central Delaware Habitat for Humanity, stated that he had
been in his new job for only 30 days and did not know what was typical, allowed, or could be done;
however, speaking as a representative for Habitat for Humanity, they would certainly entertain
absorbing the entire thing. Mr. Simpson advised that if this could not be done because it would be
unfair to the other owners who did not want to absorb the cost, Habitat would also entertain the
Page 15
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 15
possibility of absorbing their costs to help the City, because the City does a lot for Habitat.
Mr. Simpson explained that Habitat owns the properties at 21, 23, and 29 South Kirkwood Street,
and 23 South Kirkwood Street is very narrow. He stated that they had just obtained a permit to start
work on 21 South Kirkwood Street and it is beneficial for everyone when they can impact an entire
block at one (1) time and work on multiple houses at once. Mr. Simpson advised that Habitat hoped
to do a minor lot line adjustment later so that the shapes of 23 and 29 would be consistent with one
another. He indicated that for them to absorb the entire alleyway, they would also absorb the cost
of the entire alleyway if it would be a viable possibility because they hoped to make two (2)
similarly adjusted and shaped lots to help two (2) future homeowners in the City.
Mr. Don Grower, Donald G. Grower, Inc., advised that he was doing land survey work for Habitat
for Humanity in this area and had found that the alley was only six (6) feet wide, although it was
originally supposed to be 10 feet wide. He indicated the alley had gotten squeezed over the years
to fit in the properties on this block. Mr. Grower pointed out that the alley has large trees growing
in it, so it had never been opened or used, and it appeared that the area that the parcel encumbers on
the south side of the parcel owned by Habitat comes up to the tree line. He noted that the alley being
discussed was only a total of six (6) feet wide. Mr. Grower reiterated that he was working with
Habitat and offered to prepare any documents or mapping wanted to ease the situation.
Mrs. Mitchell stated that she was unsure whether the code specified that alleys are split in half with
property owners on both sides. She advised that letters were sent out to all property owners;
however, one (1) property owner in the middle was interested; therefore, she was unsure if this could
be done. Mrs. Mitchell indicated that she was unfamiliar with this and would have to research this
matter.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised that
splitting alleys between adjacent property owners had been a practice of the City. She stated that,
to her knowledge, this was not required in the code, unless it had just recently been included;
therefore, there were options.
Mrs. Mitchell advised that she would also have to check with Public Works Department staff
regarding the statement that the alley was six (6) feet wide rather than 10 feet, noting that her
information indicated that it was 10 feet wide.
Mr. Neil stated that he would be willing to table this matter to find out what the legalities were
because he thought whether this could be done was a legal issue at this point. He stated that if
Habitat wanted to do this, he would love to have them do it.
Mr. Neil and Mr. Blakeman withdrew their motion to recommend approval of staff’s
recommendation.
Mr. Neil moved to recommend referring this request back to staff, seconded by Mr. Anderson.
Mr. Slavin noted that an issue had been raised about the width of the alleys. He stated, as someone
who lives downtown where the alleys were defined a long time ago, that the markers for his alley
are in other people’s yards or the aprons of driveways. Mrs. Mitchell stated that alleys had been
encroached upon.
Page 16
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 16
Mr. Hutchison asked if referring this request back to staff would work within Mrs. Mitchell’s
timetable. Responding, Mrs. Mitchell advised that she would prefer to bring this matter back to
make sure that the City gets it right.
The motion to recommend referring this request back to staff was unanimously carried.
Amendment to Contract User Agreement with Kent County
Mrs. Donna Mitchell, Acting City Manager, informed members that the City of Dover is currently
a contract user of the Kent County Levy Court for transmission and treatment of sewage discharge.
Members were advised that Kent County treats the sewage that is transmitted from the City
transmission system prior to re-entry into the environment. Due to future expansion, and existing
conditions being altered since the last agreement was executed, multiple changes to the agreement
are necessary.
Staff recommended authorizing the Acting City Manager to execute the amendment to the contract
user agreement with Kent County.
Ms. Arndt commented that it appeared that the changes to the agreement were just corrections.
Responding, Mrs. Mitchell indicated that there were only administrative changes.
Mr. Neil moved to recommend authorizing the Acting City Manager to execute the
amendment to the contract user agreement with Kent County. The motion was seconded by
Mr. Anderson and unanimously carried.
Mr. Neil moved for adjournment of the Utility Committee meeting, seconded by Mr.
Hutchison and unanimously carried.
Meeting adjourned at 7:17 p.m.
SPECIAL PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE
The Special Parks, Recreation, and Community Enhancement Committee meeting was held with
Council President Slavin presiding in the absence of Chairman Sudler.
AGENDA ADDITIONS/DELETIONS
Mr. Hare moved for approval of the agenda, seconded by Mr. Anderson and unanimously
carried.
Page 17
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 17
Request for Benches - Continental Park
Mrs. Ann Marie Townshend, Director of Planning and Community Development advised members
that a request for benches in Continental Park had been received from Retired Colonel Tom Dix.
Members were provided an email from Colonel Dix dated March 12, 2017 with the subject “For the
Record Park Benches for Continental Park” (Attachment #2).
Colonel Tom Dix, 664 Independence Boulevard, stated that he wanted to nail down the location of
two (2) park benches for Continental Park and requested that they be located near the intersection
of Independence Boulevard and the southernmost extension of Lamplighter Lane, noting that
Lamplighter Lane is U-shaped. Colonel Dix advised that this would be near the center of a new,
re-aligned intersection on Independence Boulevard. Referring to the aerial view of the area, he
pointed out dots that reflected the potential location for the benches, which he noted lined up almost
with the crosswalk. Colonel Dix pointed out the streetlight, which he stated was numbered S13,
between the curb and sidewalk and a maple tree to the east. He expressed the desire to place two (2)
strong, four-foot-wide benches to the right and left of the tree and referred members to the
information regarding sample benches. Colonel Dix indicated that if the benches were properly
installed into two (2) pipes, they could be pulled up when the lawn is cut or for repairs and advised
that if they were sturdy benches without cross-bracing underneath, a lawnmower could get under
them. Colonel Dix advised that there had been quite a bit of traffic on the neighborhood’s Facebook
page, including references to a playground and other things. He explained that he was not
suggesting a playground but benches to accommodate elderly ladies walking to Liberty Court from
Redner's with their groceries. Colonel Dix noted that with a newly realigned intersection, this would
become a safe, protected area and a major place to cross Independence Boulevard. He explained
that there are a lot of people who meander down the road wanting to get rides, and this was a good
halfway point. Colonel Dix indicated that in the past he had asked Mrs. Townshend to possibly put
a wastebasket there because it also seemed to be a halfway point between McDonald’s and Liberty
Court, and he sometimes finds McDonald’s wrappers on his front lawn.
Colonel Dix noted that there is also a problem with people not picking up after their dogs, and
suggested that placing a wastebasket for dog waste would encourage more people to pick up after
their dogs. He noted that Dr. Dina Vendetti, Principal, St. John’s Lutheran School, had noted that
the school does a sweep for dog waste before their annual field day at the park, and she had also put
up anti-dog waste signs. Colonel Dix asked the City to spend $1,000 for park benches and suggested
being careful where they are purchased from, noting that they are very heavy and the freight cost
was expensive.
Mr. Slavin advised that sometimes when benches are put in they are used for purposes other than
what they were intended for, and he encouraged staff to look at partitions for the benches so they
do not become beds. Responding, Colonel Dix explained that this was why he wanted them to be
four (4) feet long.
Mr. Dana Shelton, 133 Red Oak Drive, advised he owns property at 22 Lamplighter Lane and has
an issue with putting benches in that area. He noted that, as President Slavin had indicated, benches
would bring people that are not wanted into the neighborhood to hang out, and he did not want to
see the property values at his townhouse decrease. Mr. Shelton did not think the benches were a
great idea and stated the need to find some other way to help people get from one place to another.
Page 18
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 18
He advised that putting park benches at this location would create a lot of problems, noting that there
a lot of people hanging out there already without park benches. Mr. Shelton stated that he serves
as the Vice President of The Greens of Dover Homeowners Association, although he was not present
to represent this organization. He indicated that the benches would be a problem for other residents,
although they had not discussed this.
Colonel Dix noted that this was why had suggested benches in a well-lit area at the westernmost
point of Continental Park near a light pole in full view of the world, not in the hidden reaches of the
park. He stated that kids currently hang out on the utility boxes across the street from this location,
and he did not mind this since this is what he thought a park is for.
Mr. Slavin asked if this had been vetted with the neighborhood association. Responding,
Colonel Dix advised that they did not have a homeowners association, but they have a Bicentennial
Village Association that does not have a president or any such structure.
Mr. Slavin noted that there is a very active Facebook page and suggested posting this matter.
Responding, Colonel Dix indicated that this had been done, there had been quite a discussion, and
great hordes of mostly women indicated that they wanted a playground there. He stated that these
women were expecting him to talk about putting in a playground; however, he did not want a
playground but just a place where people could stop and rest when walking from Redner’s to Liberty
Court. Colonel Dix asked if Mr. Shelton agreed, and Mr. Shelton indicated that he did not.
Mr. Caldwell asked if the single purpose of the request was for people to sit down and walk from
Redner's to Liberty Court. Colonel Dix noted that people could look at the trees. Mr. Caldwell
stated his thought that people should find other means of transportation if they were having trouble
walking from Redner's to Liberty Court, and if this was the only purpose being discussed, he had
a problem spending $1,000 or $2,000 for two (2) benches. Responding, Colonel Dix advised that
the cost of the benches was $500 apiece.
Mr. Anderson stated that quite a few people had expressed interest in benches and that they may
serve one (1) valuable purpose but also many more because parks need both active and passive
recreation, and this would be part of the passive recreation in Continental Park. He indicated that
the benches would be valuable for people walking back and also allow people with young families
to watch their children playing in the park. Mr. Anderson stated that this would allow more adult
supervision and more family utilization in the park. He advised that many of those who want
benches were people with children, noting that there are benches in many parks and crime is not
centered around park benches but off in the woods or darker areas. Mr. Anderson stated that
benches such as these encourage the opposite effect, such as more neighborhood involvement,
activity, and eyes.
Mr. Anderson stated that this was valuable and that former Councilman Hosfelt was setting aside
$1,000in discretionary funds for this purpose. Mr. Anderson noted that requests had gone to many
members of Council, including himself who is not in this district, as well as the State legislature.
He indicated that it was a valuable thing to do, the requests were from multiple people, and the
notice for this on the Bicentennial site was seen by over 140 people; therefore, there was a lot of
interaction and it was something worthy to do.
Page 19
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 19
Ms. Nicole Carey, 21 Patriot Drive, advised that she loves the City of Dover, graduated from Wesley
College, stayed here, married locally, and she will have lived at her current location for three (3)
years in May. She stated that when park benches were brought up, she put a post on Facebook
questioning why there was no playground in the neighborhood, which generated a lot of
conversation. Ms. Carey stated that during the day she takes her two-year-old to Wyoming Park
because Silver Lake is crowded and the park by New Street is too close to her work. She indicated
that there is no riffraff at Wyoming Park, and her two-year-old likes to feed the ducks. Ms. Carey
advised that it would be nice for her and her neighbors to walk to a playground in their
neighborhood, noting that it is great to have a swingset in the backyard but even better to have social
interaction with young children in the neighborhood. She indicated that when Colonel Dix brought
up park benches, she looked at this in a positive way, and that if the City was able to do the park
benches now, hopefully down the road there could be a playground for the young kids in the
neighborhood. Ms. Carey indicated that a park bench would be useful for women who are
breastfeeding or have diaper bags and other items and did not care where it was put, although she
thought it would be good to have a light there. Ms. Carey expressed her hope that this would be a
starting point for kids to have interaction together and for a playground within the park.
Mr. Neil stated that this problem should be directed to Parks and Recreation to look at whether there
should be a playground and benches. He indicated that members were not ready to make a decision
because the cry was for a playground, which would be useful in the neighborhood. Mr. Neil advised
that he was unsure if there was money or what the design would be.
Mr. Neil moved to recommend referring this matter to the Parks and Recreation Department to look
at creating a playground, seconded by Mr. Hutchison.
Mr. Cole advised that there is a playground and two (2) benches in his neighborhood, noting that
he has a six-year-old and they use it all the time. He stated that if there was money, he was in favor
of a workshop or referring this matter to Parks and Recreation.
Mr. Slavin advised that he had been involved in playground design at Silver Lake Park and Dover
Park and recalled a process by which the local community is engaged to pick and choose what is
wanted and this is then developed into a budget. He asked how long it takes to schedule such a
workshop. Responding, Mrs. Townshend indicated that this could happen later in the spring. She
noted that something similar was done at Mallard Pond approximately a year-and-a-half ago and
there is now a playground there. Mrs. Townshend explained that this is a community effort, and a
vendor comes out with books and allows kids to draw pictures of what they want. Mr. Slavin
advised that this is a very positive experience, and Mrs. Townshend noted that this approach gets
the community to buy in.
Mr. Slavin stated that the spirit of the motion would be to make sure this takes place this spring, and
suggested having a placeholder amount to plug into the budget hearings in May to get this done next
year.
Mr. Anderson stated that he had planned to try to amend the motion so that it would be a community
project patterned on the Mallard Pond model, bringing people together with hearings in the
community. He recommended that it not just include Bicentennial but also The Greens.
Page 20
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 20
Mr. Caldwell stated that he agreed with the discussion, noting that it had started with benches and
moved to a playground. He indicated that his concern was about having two (2) benches there, with
people loitering for any reason that they wanted to be there. Mr. Caldwell favored the park being
studied and evaluated.
The motion to recommend referring this matter to the Parks and Recreation Department to
look at creating a playground was unanimously carried.
Community Development Block Grant (CDBG) Application Review
Mrs. Tracey Harvey, Planner I, advised members that the Planning Staff had provided the proposed
Community Development Block Grant (CDBG) allocation recommendations for the FY17 CDBG
grant renewal and that proposed grant funding recommendations would be allocated to the
sub-grantees that were awarded multi-year grants from the approved 2015-2019 Consolidated Plan.
Mrs. Harvey reviewed a brief description of the programs proposed by the City's Community
Development Office for funding, stating that allocations were recommended by Staff as follows:
Current Recommended
2017 Grant Projects Grant Request
Amount Amount
$50,000 100%
Homeownership Assistance Program $60,000 $60,000
of funds spent
$47,301
Program Administration $43,312 45% of funds $43,312
spent
$22,000
Dover Interfaith Mission for Housing $24,000 75% of funds $24,000
spent
$7,208
Connections Community Support $15,000 $3,000
$0 spent
$25,000
Milford Housing Development Corporation
$40,000 30% of funds $25,000
(Emergency Home Repairs)
spent
Milford Housing Development Corporation $55,000
$60,000 $40,000
(Homeowner Rehabilitation) $0 spent
$30,000
Central Delaware Habitat for Humanity $40,000 $21,245
$0 spent
Total $282,312 $236,509 $216,557
Mr. Anderson noted that some applications for rehabilitation grants were still out and some were in
process. He asked what percentage of applications would be taken if all of the applications came
in and passed the evaluation. Responding, Mrs. Harvey explained that the waiting list was still open.
She noted that Milford Housing Development Corporation (MHDC) was previously having trouble
finding qualified homebuyers, and there had been issues with those whose taxes were not paid or
did not have home insurance.
Page 21
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 21
In regard to minor home repairs, Mr. Anderson noted that 30% of the funds had been spent and
asked how much of the $40,000 this amounted to. Responding, Mrs. Harvey advised that $25,000
had been spent, and Mr. Anderson noted that this would amount to 60%. Mrs. Harvey explained
that part of the amount had been combined with a rollover from the previous year; therefore,
technically only 30% of the funds had been spent.
Mr. Anderson recalled that there had been a problem with turnover in a previous year with the
Milford Housing Authority and there had been funds that could not be spent. In response,
Mrs. Harvey advised that, in 2014, Milford Housing Authority failed to spend the allocation in that
year and were not awarded funds the next year for that reason.
Mrs. Harvey noted that Central Delaware Habitat for Humanity still had funding available from the
previous year, and her recommendation was to allocate an additional $30,000 to the Homeownership
Program, since 100% of those funds had been spent already and there was a demand for this
program.
Mr. Neil moved to recommend approval of the Community Development Block Grant (CDBG)
allocations, as recommended by staff. The motion was seconded by Mr. Hutchison and
unanimously carried.
Mr. Neil moved for adjournment of the Special Parks, Recreation, and Community
Enhancement Committee meeting, seconded by Mr. Cole and unanimously carried.
Meeting adjourned at 7:49 p.m.
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee meeting was held with Chairman Hutchison
presiding.
AGENDA ADDITIONS/DELETIONS
Mr. Cole moved for approval of the agenda, seconded by Mr. Keller and unanimously carried.
Quarterly Update - Bicycle/Pedestrian Subcommittee
During the Regular City Council Meeting of February 13, 2017, Council considered the Bicycle and
Pedestrian Subcommittee Recommendations regarding the Walk21 International Charter for
Walking and Proposed Resolution No. 2017-01 - Complete Streets and referred these items back to
the Bicycle/Pedestrian Subcommittee. Mr. Jim Hutchison, Chair, Bicycle/Pedestrian Subcommittee,
advised that the Subcommittee had previously recommended authorizing staff to sign the Walk21
International Charter for Walking on behalf of the City of Dover. He noted that this Charter
provides a common framework that helps cities focus policies and activities to create a culture where
people choose to walk. Mr. Hutchison advised that Council had questioned whether it was in the
City's best interest to sign the Charter. He explained that, while the Bicycle/Pedestrian
Subcommittee believed that the Charter had good intentions, they did not want their work to be
controversial in any way; therefore, they withdrew the request to sign the Charter.
Page 22
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 22
Mr. Hutchison indicated that the Subcommittee would like Proposed Resolution No. 2017-01 -
Complete Streets to be moved forward, noting that this Resolution was an acknowledgment of
existing regulations and practices, and it seemed important to provide appropriate and safe street
infrastructure for all traffic using streets.
Mr. Hutchison stated members that the Subcommittee had continued to follow the West Dover
Connector project and its implications on bicycling and pedestrian activity. He explained that a
shared use path would cross the West Dover Connector at Ridgely Boulevard. Mr. Hutchison
advised that the Subcommittee members had been informed through a Delaware Department of
Transportation (DelDOT) presentation that the crossing would not be built as planned and, as
currently being put forward by DelDOT, would not be protected in any way. Mr. Hutchison
indicated that the Subcommittee had a strong concern about the safety of this crossing, noting that,
according to DelDOT, the West Dover Connector would be heavily used. He indicated that
members thought consideration of some type of protection at the crossing, such as a rapid flash
beacon or some other type of control device, was warranted. Mr. Hutchison explained that DelDOT
had advised that the first step for consideration of protection would be completion of a pedestrian
traffic study. He advised that the Subcommittee was asking that a letter be sent to DelDOT
requesting a traffic study where the shared use path and the West Dover Connector cross each other.
Councilman Hutchison asked if Planning Department staff had looked at the safety issue regarding
the bike path. Responding, Mrs. Ann Marie Townshend, Director of Planning and Community
Development, stated that staff, along with the Subcommittee, had looked at this issue, noting that
the project manager from DelDOT had attended the last Subcommittee meeting. She stated that, in
DelDOT's view, the warrants at Ridgely Boulevard and the West Dover Connector were not met to
signalize that intersection. Mrs. Townshend explained that, although there would be only one (1)
lane of traffic to be crossed and a center median to stop at in the middle, there was concern because
this would be a 40-mile per hour road. She indicated that she had learned through her previous
experience with the Dover High School project that DelDOT would not put any type of signal or
rapid flash beacon at the location unless there was a study and warrants were met. Mrs. Townshend
indicated that a study should be requested from DelDOT once the road is up and running.
Chairman Hutchison stated his understanding that the City would need to put together a letter to
DelDOT to request a study, and Mrs. Townshend confirmed this, stating that if the Committee was
interested, she could make sure that this goes into the next meeting packet.
Mr. Neil moved to recommend sending a letter to the Delaware Department of Transportation
(DelDOT) to request a traffic study at the crossing of the shared use path at Ridgely Boulevard
and the West Dover Connector (Attachment #3). The motion was seconded by Mr. Cole and
unanimously carried.
In regard to Proposed Resolution No. 2017-01 - Complete Streets Policy, Mrs. Townshend advised
that after the Resolution was sent back to the Subcommittee, members discussed it and felt that it
was important to move it forward because it was forward focused and related specifically to the
policies and practices in place in Dover. She noted that this Resolution would take things that were
spread throughout a variety of documents and put them together into one (1) Resolution.
Page 23
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 23
In response to Chairman Hutchison, Mrs. Townshend advised that she supported the Resolution.
Mr. Slavin moved to recommend placing Proposed Resolution No. 2017-01 - Complete Streets
Policy, back on an agenda for consideration by the Safety Advisory and Transportation Committee,
seconded by Mr. Cole.
Colonel Tom Dix, 664 Independence Boulevard, stated that he had attended a DelDOT function
regarding bicycling a few weeks ago at the Dover Public Library and also attended a meeting of the
Metropolitan Planning Organization (MPO) that the Mayor had chaired. He advised that a bicycle
path was planned that would run east and west on the north side of Forrest Avenue that would
somehow have to get to the south side of Forrest Avenue to get over to the high school. Colonel Dix
had questioned how bicycles would jump from the north side of Forrest Avenue to the south side
and how they would get around the Kenton Road/Forrest Avenue intersection. He indicated that
those present appeared surprised by his question and noted that he did not think they had a plan.
Mr. Hutchison advised that he could not answer Colonel Dix’s specific question; however, there was
a plan for the pathway.
The motion to recommend placing Proposed Resolution No. 2017-01 - Complete Streets Policy
back on an agenda for consideration by the Safety Advisory and Transportation Committee
was unanimously carried.
Mr. Neil moved for adjournment of the Safety Advisory and Transportation Committee
meeting, seconded by Mr. Keller and unanimously carried.
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held with Chairman Hare
presiding.
AGENDA ADDITIONS/DELETIONS
By unanimous consent, the agenda was approved as presented.
Request for Incentives - Nail Spa by TR
During their meeting of March 1, 2017, the Economic Development Committee recommended
forwarding the Request for Incentives - Nail Spa by TR to Council and to present an amendment to
the ordinance to the Legislative, Finance, and Administration Committee, along with a retroactive
date and the number of other permits and properties that the amendment would apply to, so that
there would be a sense of what the amendment would do to the revenue that had already been
collected. City Council approved this recommendation during their Regular Meeting of March 13,
2017.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised that a
request had been received from the owner of Nail Spa by TR to expand the Downtown Development
District (DDD) incentives to a larger area. She explained that Ms. TR Rowe had recently opened
Page 24
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 24
a business in the City and was not eligible for the incentives. Mrs. Townshend indicated that the
DDD was a very geographically focused program and, under the State’s program, the City was
limited to 225 acres. She indicated that there was not a good way to expand the incentives beyond
that area; however, there was an incentive in Appendix E of the Dover Code of Ordinances for
commercial and industrial building redevelopment. Mrs. Townshend indicated that this incentive
requires a minimum of 5,000 square feet of floor area and allows for a waiver of half of the building
permit fees and half of the impact fees, as well as tax abatement for 10 years on the value of the
improvements. She noted that Nail Spa by TR occupies less than that 5,000 square foot threshold;
therefore, it did not qualify for this incentive. Mrs. Townshend advised that, during the Economic
Development Committee meeting, members discussed bringing forward an amendment to strike the
language in Appendix E regarding the minimum 5,000 square foot floor area so that smaller areas
would qualify for the incentives. She indicated that another aspect discussed was making the
amendment retroactive so that this particular business owner would be able to receive the incentives.
Mrs. Townshend stated that she had explained that, in order to be fair, there would be a need to look
at other businesses that did not get the incentive because of their size. She indicated that she had
offered to review this matter and bring forward what the costs would be; however, it was determined
that the permit was issued for renovations for Nail Spa by TR in July 2015, the Certificate of
Occupancy was granted in September 2015, and the funds were collected in a prior fiscal year.
Mrs. Townshend explained that if the amendment was made retroactively, it would apply to many
locations and it would require a great amount of staff time to comb through all of the building
permits to determine how widely applicable it would be. In addition, she noted that typically money
is not refunded from prior fiscal years and thought this was a bad precedent to set. Mrs. Townshend
indicated that there were two (2) things coming out of Committee: 1) the retroactivity which she
would not recommend, based on the datedness of the permits and the renovations that were
completed; and 2) changing the ordinance going forward to remove the 5,000 square feet of floor
area, which would make very small tenant spaces and shopping centers eligible for the incentives.
She noted that this would be a benefit on the business side of things; however, there would be a cost
on the revenue side of things. Mrs. Townshend stated that it seemed fair to remove the threshold
given that 5,000 square feet was not a magic number.
Mr. Anderson stated that he agreed with Mrs. Townshend and did not see any reason to give any
money back retroactively. He asked if it would be acceptable to take the July 1, 2015 date and allow
businesses to apply for their 10-year exemption 10 years forward from the year that it is approved.
Responding, Mrs. Townshend advised that this would be a middle ground position that would not
require researching of back permits and refunding money from prior years.
Mr. Anderson stated that this would put the responsibility on the property owner, noting that the City
would provide public notice on the City’s website, possibly by placing a small legal ad in the
newspapers, and through the Chamber. This would put the responsibility on the property owner to
do the application, rather than on staff to research, and would not take money from other taxpayers.
He questioned if this would be a way to achieve the objective and Mrs. Townshend stated that she
thought that it would.
Mr. Hare questioned if the City would still be refunding money. In response, Mrs. Townshend
stated that it would not, and this would be tax abatement going forward 10 years from the time of
application rather than going backward.
Page 25
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 25
Mr. Neil asked how much money the tax abatement would be for a small building with 2,500 square
feet. Responding, Mrs. Mitchell indicated that this would depend on the current assessed value.
Mrs. Townshend noted that this could vary depending on the location of the property in the City and
its condition.
Mr. Anderson noted that the project has to be at least $15,000.
Dr. Stewart stated her understanding that the request was to eliminate the 5,000 square foot
minimum; however, it was unknown how much this would cost in the future if businesses that did
not previously qualify could qualify going forward, and this was confirmed by Mrs. Townshend.
In response to Dr. Stewart regarding the location of the property, Mrs. Townshend indicated that it
was located just before the Arby’s on Route 8.
Mr. Hare asked if the downtown development incentives would be expanded, and Mrs. Townshend
responded that they would not. She stated that incentives had been developed for vacant commercial
properties on Route 13, industrial buildings, and industrial parks to encourage their reuse.
Mrs. Townshend advised that these incentives had been used for the Walmart redevelopment and
Mission Barbecue projects. She noted that this was a lesser incentive than those in the downtown
area but was nonetheless an incentive. She reiterated that the request was to remove the 5,000
square foot threshold.
Mr. Hare questioned if the 5,000 square foot threshold could be left and another threshold could be
established with a little less incentive, and Mrs. Townshend indicated that this could be done.
Mr. Neil expressed his opinion that members did not have enough information to know what
approving this would cost and stated the need for more information.
Mr. Slavin asked if the City had any kind of modeling for incentives that would indicate, if the City
is giving on the revenue side, what the gain would be in economic impact of the business on the
community. He noted that everyone wanted to be pro-business but, at the same time, he would not
want another Council 10 years from now to question this amendment and have to undo it.
Mrs. Townshend stated that she did not know that there was a specific model; however, typically,
incentives are targeted to address a specific problem. She stated that a number of fairly large
businesses were leaving or vacant, such as Walmart and K-Mart, which was causing concern.
Mrs. Townshend noted that these incentives were put in place to address a specific problem. She
did not know that the proposal would necessarily solve a problem. She questioned if expanding the
incentive would be solving a problem that does not exist or if the whole purpose was to be business
friendly. She stated that it was known that businesses would not happen in the downtown area
without these incentives and noted that the variety of incentives through the State, County, and City
were making it worthwhile for people to invest. Mrs. Townshend indicated that she was unsure that
the problem exists outside of the downtown area. She stated her belief that the incentive should be
targeted to a problem that the City is trying to solve, noting that she was not convinced that there
was necessarily a problem, other than wanting to be more friendly to business.
Mr. Shevock asked if the incentive for 5,000 square feet was the same for 10,000 square feet.
Responding, Mrs. Townshend stated that it was; however, she noted that there were permit fee and
Page 26
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 26
impact fee partial waivers; therefore the value of the incentive would change. She advised that the
costs and permit fees for renovating a very large space would be more; therefore, the savings would
be more. She noted that this would be proportionate. Mr. Shevock asked, if this would
proportionately go up, whether the fees could proportionately come down for someone with lesser
square footage, and Mrs. Townshend stated that it would. Mr. Shevock indicated that this would
be the thing to do, noting that everyone would then be equal. Mrs. Townshend agreed and noted that
there would still be a $15,000 minimum of construction value.
Mr. Anderson stated that it was important not just to be friendly to business but to maintain the flow
of business. He noted that businesses come and go, and business places become empty, and the
value of them goes down. Mr. Anderson advised that it was found that if incentives are put in place,
people invest and increase the value of the property. He noted that this incentive does not lower the
amount of taxes collected from a property but increases taxes collected; however, it temporarily
increases the amount collected at a lower rate. Mr. Anderson indicated that it encourages people to
improve the value of the property, so it provides in the long run a higher tax base and more tax
revenue. He stated that in the short run it provides more revenue, fees, and economic activity and
is designed to bring in more business activity and generate more revenue. Mr. Anderson noted that
this design does not have any value difference, noting that there are small empty spaces and that
filling five (5) 2,000 or 2,500 square foot office or store spaces is just as valuable as filling one (1)
of the bigger stores. Mr. Anderson advised that small business cannot be left out anymore and the
City must be friendly to them, not only to the medium and larger businesses.
Mr. Slavin indicated the desire to approach this issue with some science behind it. He expressed the
desire to be as business friendly as possible, especially to small businesses, and indicated that this
was not necessarily a bad idea; however, he was not convinced with the information provided that
the City would be getting a benefit.
Mr. Hare stated that, based on what he was hearing, any small business could come to the City and
receive a 10-year tax exemption, just like Ross or Big Lots. Mrs. Townshend clarified that all these
businesses would receive tax abatement. Mr. Hare noted that a business such as a massage parlor
could shut down, reopen with a new owner, and get 10 years in tax abatement. Responding,
Mrs. Townshend indicated that they would have to demonstrate that they had $15,000 worth of
construction value in renovations for tax abatement.
Mr. Hare stated that he did not think that members had enough information to make an educated
decision.
Mr. Anderson pointed out that it would not lower the taxes that are currently paid and is not a tax
abatement on the property but a tax abatement on the improvement. He noted that it is designed to
give a partial tax abatement on the increased value for a period of time if more money is invested.
Mr. Anderson indicated that it would not pay someone to shut their business down and reopen it
because it would not change their taxes. He explained that it was not designed to create more taxes
in property in the City of Dover, but to increase the amount of taxable property in the City of Dover,
and to provide a partial abatement on the improvement value of the property.
Page 27
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 27
Mr. Hare asked, when the Walmart center reopened, if they were still paying 100% of the property
taxes that they were paying. Mrs. Townshend responded yes and noted that they were also paying
the increased value on the outbuildings; however, they were receiving an abatement on the main
building. She explained that if their taxes had increased from $5,000 to $7,500, they would still be
paying only $5,000 over the next 10 years.
Mr. Hare asked if the individual from Nail Spa by TR was requesting just an abatement.
Responding, Mrs. Townshend advised that her letter had indicated that she wanted the downtown
incentives. She indicated that she was unsure if Ms. Rowe was the property owner and, if not, what
the structure of her lease was. Mrs. Townshend advised that she did not know if Ms. Rowe was
paying the taxes or if the landlord was paying them.
Mr. Hare expressed his opinion that expanding the downtown incentives would be opening up a can
of worms and questioned how far out the incentives would be extended. He stated that businesses
outside the DDD should be treated like the Big Lots property or anyone else, and Mrs. Townshend
agreed. He expressed the need to come back with a plan before this issue could be addressed.
Mayor Christiansen advised that Mrs. Traci McDowell, City Clerk, had pointed out that the
ordinance had a sunset date of December 31, 2018, and he recommended taking it back and
massaging it prior to its being sunset.
Mr. Neil moved to recommend that Staff come back with a recommendation with regard to
buildings with less than 5,000 square feet, what the impact would be, and whether or not the
time could be increased for a smaller building to have the abatement. The motion was
seconded by Mr. Anderson and unanimously carried.
Page 28
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF MARCH 28, 2017 PAGE 28
Search to Fill Vacant Positions
Mr. Slavin noted that the City had to begin the process for a search for two (2) key positions.
City Manager
Mr. Slavin proposed accepting and reaffirming the City Manager job description that was approved
in 2013 without change and reviewed Staff’s suggested recruitment resources for the position.
Mr. Slavin indicated that he would recommend stopping just short of the suggestion to utilize an
executive recruiting firm. He asked that members also authorize the Human Resources Director to
advertise locally, on Monster.com, and social media, and that the process begin immediately.
Mr. Slavin moved to recommend acceptance and reaffirmation of the City Manager job
description that was approved in 2013 without change, and authorizing the Human Resources
Director to advertise as Staff recommended, through the International City/County
Management Association, Delaware City Manager Association, Delaware League of Local
Governments, Sussex County Association of Towns, Maryland Municipal League, and colleges
with MPA programs, as well as locally, on Monster.com and social media, and that the process
begin immediately. The motion was seconded by Mr. Anderson and unanimously carried.
City Planner
Mr. Slavin expressed the hope that there was someone who could come in and operate the Planning
Office, stating that he would like, after approximately a 90-day period, for this person to provide an
assessment of some of the duties involved with the office and a recommendation of organizational
structure. He noted that this would then inform what the position description and search might be
for the search. Mr. Slavin stated his belief that there was no action to be taken, other than to
acknowledge this, and for everyone to understand that they would be waiting on initiating that
search.
Mr. Hutchison moved for adjournment of the Legislative, Finance, and Administration
Committee meeting. The motion was seconded by Mr. Shevock and unanimously carried.
Meeting adjourned at 8:23 p.m.
By unanimous consent the Council Committee of the Whole meeting was adjourned at
8:23 p.m.
Timothy A. Slavin
Council President
TAS/TM/js/dd/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2017\03-28-2017 CCW (revised 05-26-2017 - typographical errors) - JS.wpd
Attachments
Attachment #1 - Letter from Ms. Janie Libby, Central Delaware Chamber of Commerce (CDCC), dated
February 22, 2017 regarding the Electric Utility
Attachment #2 - Email from Colonel DIX dated March 12, 2017, Subject: “For the Record Park Benches for
Continental Park”
Attachment #3 - Draft Letter to the Delaware Department of Transportation (DelDOT) Requesting a Traffic Study at
the Crossing of the Shared use Path at Ridgely Boulevard and the West Dover Connector
Page 29
ATTACHMENT #1
Council Committee of the Whole Meeting of 03/28/2017
Central Delaware
Chamber of Commerce
February 22, 2017
Chair The Honorable Timothy Slavin
Janie M. Libby President
First Vi ce Chair City Council
Sean M. Mace
City of Dover
Vice Chair 15 Loockerman Plaza
Econom ic Development
Shane E. Breakie Dover, DE 19901
Vice Chair
Organizational Deve lopm ent
Adrienne Hawes
Re : Electric Utility
Vice Chair
Commu nity Affairs Dear Councilman Slavin;
Evans Armantrading, Jr.
Vice Chair As you and members of Council are aware, the Central Delaware Chamber of
Legislative Affa irs
C. Scott Kid ner Commerce (CDCC) has long been interested in a number of issues as it relates to
Vic e Chair
the growth of our members here in the City.
Military Affairs
Lynne S. Schaefer
At a recent "workshop" of City Council and senior leadership of city government,
Treasurer
Christina M. Lessard the CDCC submitted for the record and brief testimony our Vision 2020,
providing nine different areas of interest reiated to economic development.
Vice Chair
Smyrna/Clayton Some of the comments were directed at creating support mechanisms in the
Dana F. Wattay
City that help business owners to navigate the permitting system, while another
Past Chair was to create a new sponsorship program for our city parks.
Tammy J. Ordway
Directors
Alexander J. Guardi One issue the CDCC believes is paramount to the future health and growth of
Je sse C. Keleher our city is the current ownership and management of the city's electric utility.
Jenny R. Mabu s
Stephanie J. 5. Preece We think Dover's electric rates are not as competitive as they should be, and in
Peter M. Renzi
John D. Shevock cases where use is significant, it becomes a competitive disadvantage for the
Dr. Lisa J. Strusowski user. Generation and distribution of electricity has become extremely
Dr. Dina C. Vendetti
Robert R. Ware complicated, and it is now time we examine Dover's role in owning and
Kevin D. Yingling
managing this complex system or should it be sold and managed by another
Honorary Board Members
Honorable Bradley S. Eaby
party.
Col. Ethan C. Griffin
President Based upon our Vision 2020 document and conversations with City leaders and
Judy Diogo, CFRE, IOM
other interested parties, we hereby submit for Council's consideration the
Staff following "CDCC Electric Utility Task Force" (TF) made up of the following
Cri sta I R. Brenneman
Lori L. Ewald potential membership:
Kendra D. Friel
Kristi J. Osborn
Heather L. Patosky
Heather M. Pleasants
' 'UNftf.D STATF..'; CUA~WER OF COMMERCE "Th e CDCC is the leading resource essential to business growth in Central Delaware"
435 N. Dupont Highway · Dover, Delaware 19901
302.734.7513 · fax 302.678.0189
www.cdcc.net · email: info@cdcc.net
Page 30
1. President, City Council
2. Chairman, City Council Utility Committee
3. City Council Member, appointed by the Mayor
4. City Manager (who will act as Vice-Chair of this TF)
5. Director, City of Dover Electric Department
6. Chairman of the CDCC (who will act as Chair of this TF)
7. Two members of the CDCC appointed by the Chairman of the
Chamber, one of whom will be familiar with purchasing and sale
of energy
8. One residential property owner in the City appointed by the
Mayor
9. One commercial property owner in the City appointed by City
Council President
10. One industrial property owner in the City appointed by the
Chair of the Utility Committee
We ask that all Task Force appointments be completed so the first meeting may
occur on or before 15 March 2017 . All meetings shall be at the call of the Chair.
The TF will produce an Executive Summary on or before 15 June and to present
their findings to City Council. Technical support and staffing will come from the
CDCC and the City as required.
Overall, it is the intention of the CDCC to form this Task Force to explore facts
both pro and con as to whether the sale of the city's distribution/generation
system and facilities to a 3rd party has merit. The information provided to the
Task Force shall be provided by users, city management, potential purchasers,
and if possible, an independent source that operates within the utility business.
However, the facts both for and against the sale of the electric utility to a
potential purchaser cannot be made by this Task Force. Its objective is to
provide all the facts and details as to whether a sale of the electric utility is
beneficial to all the citizens of the City. Any decision on the sale of the system
must be made by City Council, and to be done in a transparent fashion.
The CDCC is hopeful the outcome of this Task Force will provide City Council and
the citizens of the City with the necessary information to make a deliberative
and thoughtful decision.
Thank you for this opportunity to serve, and we look forward to starting the
"Electric Utility Task Force" as soon as practical.
Respectfully,
Janie Libby
Chair of the Board, CDCC
Page 31
ATTACHMENT #2
Council Committee of the Whole Meeting of 03/28/2017
thomas j. dix
From: thomas j . dix < kathytomrn@verizon.net >
Sent: Sunday, March 12, 2017 1:23 PM
To: 'A Townshend@dover.de.us'
Subject: FOR THE RECORD PARK BENCHES FOR CONTINENTAL PARK
Ann Marie Townshend
Director, Planning and inspections
City Hall
15 loockerman Plaza
Dover, de 19903
March 12, 2017
Dear Ann Marie,
I just wanted to nail down the location of the two park benches for Continental Park.
I am requesting that they be located near the intersection of Independence Blvd . and
Lamplighter Lane. Since Lamplighter is "U" shaped, the southern most intersection.
This will also be near the center of the new realigned intersection on Independence Blvd.
It will offer the best place to cross Independence Blvd. There is a street light pole numbered as
S-13 between the curb and side walk. Proceed east a few feet to the nearest tree . Place the two
benches three feet to the left and right of the tree with the benches running in line with the row of
the trees and facing the park. Very sturdy 4 foot wide benches would be the best.
My purpose for the benches is accommodate the little old ladies who are walking back to Liberty
Court from Redners. It is a good half way point.
I do want to thank you for your interest in Bicentennial Village.
Page 33
expanded Metal Park Benches I Thermoplastic Coated I Park Bench~s.. I.Belsotr·0tttcl-o-ors·-._. Page 2 of 3
.,;.;.•.;;;;;:•-"';;.• »· . . . .. ·~~. ··•·· •.
I : ,_..L· ~
Expanded Steel
Round Corners
·· ..
Matching Products
Expanded Expanded 1 R -·
l'
Thermoplastic Coated Thermoplastic C
Park Bench 15' Park Benches ·
Model R8WB-I
' •,. , , '• . t.,f p l _. , o··""''_./'/ " -
v C(i1?ri:)fj ,Tii~ls"'(a~·;; il;; blfJ.Jr~61,t;li sot·-rt f tii ·i~l1 on ·1:·
marine r• mystic !L blue green• y(;IJC<w r.Jra!){ii:!
raa • burgurdy cmple bk~ (.ik. gr<J~· clay
browr>•· wit ite .;:- teal ·>
'f' Item Specific Details Available on Linked Model Numbers Below Tweet G+l
Thermoplastic Coated Expanded Steel Park Style Benches 1 4' Length Qty
... ,.-R4WB-P
::::::::::::::, Portable lBack/Seat .s;olor vI Frame Color v j (84 lbs) $426.00 ,
.-R4\NB:J]) In-ground [Back/Seat Color vI Frame Color ~ (80 lbs) $426 .00 :
~R Optional ~vers- One Set of 2 Covers Required Per Bench- $50/Set 0 No 0 Yes
R4WB-S Surface Mount Back/Seat Color vI Frame Color v] (80 lbs) $426.00
1
SMSCOVER Optional Covers - One Set of 2 Covers Required Per Bench - $50/Set 0 No () Yes
Thermoplastic Coated Expanded Steel Park Style Benches 1 6' Length Qty
R6WB-P Portable [&iCk!Seat Color vI Fram~ Color V] (113 lbs) $394.00
---'--'-----""'::
R6WB-I In-ground ~ac~_t};eat Color vI Frame Co.lor ~J (113 lbs) $394.00
SMSCOVER Optional Covers- One Set of 2 Covers Required Per Bench- $50/Set 0 No 0 Yes
R6WB-S Surface Mount l§~cktSeat Color vI Frame Colo-r --- -v] (113 lbs) $394.00 '·
SMSCOVER Optional Covers- One Set of 2 Covers Required Per Bench- $50/Set 0 No 0 Yes
Thermoplastic Coated Expanded Steel Park Style Benches 1 8' Length Qty
R8WB-P Portable ~~~~.§~~atcoior vI FrameColor vl (170 lbs) $439.00
http://www.belson.com/Traditional-Style-Park-Benches-with-Steel-Frame?q=r4wb-i 3/10/2017
Page 34
ATTACHMENT #3
Council Committee of the Whole Meeting of 03/28/2017
TIMOTHY A. SLAVIN 24 Hazel Road
Councilman - At Large Dover, DE 19901
Council President
City of Dover (302) 270-6192 - Cell
(302) 736-7006 - City Office
*Date
Secretary Jennifer Cohan
Delaware Department of Transportation
P.O. Box 778
Dover, DE 19903
Dear Secretary Cohan:
We are excited to see the progress on the construction of the West Dover Connector, and we look forward to
the new road opening to traffic. One matter of concern has come to our attention regarding this road, and we would
like to share our concern with you. The West Dover Connector includes a multi-use path along the alignment. In the
area of Eden Hill Farm, the path parallels the west side of the roadway as it travels north to Ridgely Boulevard. At
Ridgely Boulevard, the path on the west side of the roadway ends, and cyclists and pedestrians are forced to cross the
road to where the path continues on the east side of the roadway. Under current conditions, traffic volumes from
Ridgely Boulevard do not meet the warrants for a traffic signal. The speed limit for this segment of roadway is 40 mph.
As we understand, pedestrians and cyclists will cross one lane of traffic in each direction with a landscaped median
in the center.
Due to the speeds of traffic expected on the West Dover Connector, we are seriously concerned that there is no
traffic control (such as a signal or a rapid flash beacon) proposed for this location. We do not believe that an
uncontrolled crossing for pedestrians on a roadway with a posted speed of 40 mph is safe. We request that the
Department of Transportation revisit this specific design aspect of the roadway. If some sort of controlled crossing
cannot be installed initially, we request that the Department initiate studies to determine if a traffic control device is
justified as soon as the roadway and multi-use path become open to the public.
We enthusiastically support efforts to add the bicycle and pedestrian amenities with the new roadway, but we
ask you to do what you can to ensure the safety of motorists, pedestrians and cyclists who use the West Dover Connector
and associated multi-use path.
If you have any questions, please do not hesitate to contact me at (302) 270-6192.
Sincerely,
Timothy A. Slavin
Council President
TAS/js
S:\Correspondence\Council Meeting\2017\04-10-2017 DRAFT Letter to DelDOT - West Dover Connector Crossing.wpd
cc: Mr. Dave Hugg, Acting Director of Planning and Community Development
Mr. James Hutchison, Chair, Bicycle/Pedestrian Subcommittee
P.O. Box 475 ˜ Dover, Delaware ˜19903
Community Excellence Through Quality Service