Page 1
SPECIAL COUNCIL MEETING - BUDGET REVIEW AGENDA
CITY HALL COUNCIL CHAMBERS, 15 LOOCKERMAN PLAZA, DOVER, DELAWARE
REVISED BY CANCELING THE MAY 31ST AND JUNE 1ST MEETINGS
PUBLIC COMMENTS ARE WELCOMED ON ANY ITEM AND WILL BE PERMITTED AT APPROPRIATE TIMES. WHEN
POSSIBLE, PLEASE NOTIFY THE CITY CLERK (736-7008 OR E-MAIL AT CITYCLERK@DOVER.DE.US) SHOULD
YOU WISH TO BE RECOGNIZED.
AGENDA ADDITIONS/DELETIONS
MAY 30, 2017 - 6:00 P.M.
1. INTRODUCTION AND PRESENTATION OF FISCAL YEAR 2018 RECOMMENDED BUDGET
2. HIGHLIGHTS OF OVERALL BUDGET
3. ELECTRIC FUND POWER COST ADJUSTMENT (PCA) CREDIT
4. SANITATION COST OF SERVICE RECOMMENDATION
5. PUBLIC SAFETY FEE RECOMMENDATION
6. RETIREMENT BENEFITS
BREAK.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (7:15 - 7:30 P.M.)
7. OPERATING DEPARTMENT AND DIVISION SUMMARIES
8. FUND SUMMARIES AND RESERVE ACCOUNTS
9. REVIEW OF CAPITAL INVESTMENT PLAN SUMMARIES
10. RECESS BY 9:00 P.M.
MAY 31, 2017 - 6:00 P.M. (CANCELED)
JUNE 1, 2017 - 6:00 P.M. (CANCELED)
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\COUNCIL-AGENDAS\2017\05-30-2017 SPECIAL COUNCIL-BUDGET REVIEW-REVISED 05-31-2017.WPD
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(E)(2), THIS
AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE
SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Page 3
FY 2017 – 2018 Draft Budget for the City of Dover, Delaware
Table of Contents
City Manager’s Letter............................................................................................. 3
City of Dover Vision ............................................................................................... 4
City Organizational Chart...................................................................................... 5
Highlights of Overall Budget ............................................................................. 7
Major Rate & Fee Trends ....................................................................... 22
Electric Fund PCA Credit .................................................................................... 23
Sanitation Cost of Service Recommendation ................................................. 31
Police Extra Duty Cost of Service Recommendation ..................................... 36
Public Safety Fee Recommendation ................................................................ 39
Retirement Benefits............................................................................................ 41
Budget Review FY 2017-2018 ............................................................................ 45
General Fund ......................................................................................... 47
Water/Wastewater Fund ...................................................................... 75
Electric Fund .......................................................................................... 80
All Funds Summary ............................................................................................. 89
Cash Receipt Summary .......................................................................... 90
Expense Summary................................................................................... 91
Governmental Capital Projects ............................................................................ 96
Water/Wastewater ................................................................................................. 97
Electric ..................................................................................................................... 102
Sec. 44 – Annual Budget ....................................................................................... 108
Financial Policies .................................................................................................... 109
Budget Administration Guidelines ...................................................................... 118
i
Page 4
FY 2017 – 2018 Draft Budget for the City of Dover, Delaware
Table of Contents
Personnel Table ..................................................................................................... 122
Personnel Cost Summary ..................................................................................... 123
FY15 through FY18 Comparison .......................................................... 124
Total City Summary ............................................................................................... 127
Funding Source Summary FY18-FY22 ............................................................... 129
Projects by Department FY18-FY22 ................................................................... 130
Funding Source Summary FY18-FY22 ............................................................... 154
Projects by Department FY18-FY22 ................................................................... 155
Funding Source Summary FY18-FY22 ............................................................... 178
Projects by Department FY18-FY22 ................................................................... 179
General FY18-FY22 ............................................................................................... 223
Water/WW FY18-FY22 .......................................................................................... 227
Electric FY18-FY22................................................................................................. 230
Legal Debt Margin ................................................................................................ 233
Projected Debt Service ........................................................................................ 234
Water/WW Revenue Bonds................................................................................. 235
Electric Revenue Fund ......................................................................................... 237
Mayor....................................................................................................................... 241
City Council ............................................................................................................. 243
City Manager........................................................................................................... 245
City Clerk ................................................................................................................. 247
Customer Services ................................................................................................. 249
Finance .................................................................................................................... 251
Procurement & Inventory ..................................................................... 252
Fire ........................................................................................................................... 254
Human Resources.................................................................................................. 256
Information Technology ....................................................................................... 258
Parks & Recreation ................................................................................................ 260
Library...................................................................................................................... 262
Police........................................................................................................................ 264
ii
Page 5
FY 2017 – 2018 Draft Budget for the City of Dover, Delaware
Table of Contents
Tax Assessor ........................................................................................................... 267
Planning/CDBG ....................................................................................................... 269
Life Safety ............................................................................................................... 270
Code Enforcement ................................................................................................. 271
Inspections .............................................................................................................. 272
Administration........................................................................................................ 274
Public Works Engineering ..................................................................................... 275
Facilities Management .......................................................................................... 276
Fleet Maintenance ................................................................................................. 277
Grounds................................................................................................................... 278
Sanitation ................................................................................................................ 279
Street ....................................................................................................................... 280
Water/WW Engineering ......................................................................................... 284
Water Management ............................................................................................... 285
Wastewater Management .................................................................................... 286
Water Treatment Plant.......................................................................................... 287
Power Plant Operations ........................................................................................ 290
Power Supply .......................................................................................................... 291
Transmission & Distribution ................................................................................ 292
Electric Engineering ............................................................................................... 293
Administration........................................................................................................ 294
Meter Reading ........................................................................................................ 295
System Operations ................................................................................................ 296
Municipal Street Aid .............................................................................................. 298
Realty Transfer Tax ................................................................................................ 299
Worker's Compensation ....................................................................................... 300
Community Transportation .................................................................................. 301
Library Grants......................................................................................................... 302
Police Grants........................................................................................................... 303
Electric Red Light Program ................................................................................... 304
Community Development Block Grant (CDBG) ................................................. 305
Substance Abuse Prevention Program ............................................................... 306
iii
Page 8
(!IiiHaf ,paber
May 17,2016
May 17, 2017
Honorable Mayor & Members of City Council
Cityof Dover
Dover, DE 19901
RE:
FiscalYear2017-2018
Proposed
BudgetOperating
Department
& Division
Summaries
DearMayor & Members of City Council:
Enclosedis the proposedFiscalYear2017-2018City of DoverBudgetfor your consideration.The City staff provided
agreat deal of assistance
in meeting the challengeswe facedwith the presentmentof a balancedand policy
compliantbudget.Theproposedbudget reflects our continuedcommitment to providing cost-effective,efficient,
basicmunicipal servicesfor our citizens,visitors and businesscommunity.
Thetotal financialprogramfor FY-2018is proposedto be 5143,079,600(this includesan operatingbudget of
S130,522,000 anda capitalinvestmentsbudgetof S12,557,600). TheFY-2018financialprogramrepresentsan
increaseof 3.3%over the originalFY-2017financialprogram(S138,472,000).
Thebudgetrecommendation includescostof servicerate increasesfor sanitationoperationsandpoliceextraduty
services.Past
discussionsregardinga public safety fee for tax exemptpropertieshas beenaddressedwith a
recommendation
for discussion
andapproval.
Finally,a distribution
of FY16
excess
earnings
for theElectric
Utility
isrecommended
asaPCACreditof S.00855.
Thisrepresents
a56.2millionor 5.5%of revenuefor theutility.Sample
billsare included by customer classto demonstrate the savingsto the customers.
Thepresentations
that followthe Organization
Chartin the IntroductorySectionof the budgetdocument
summarizes all the key factors that influencedthis budget and the end results. TheBudget Workshopwill be
conductedwith emphasison the materials in these documents. Long-term forecasting has not been included in
thedocument and will be presented during the month of August to the Council Committee of the Whole. The
presentationdocuments for the City of Dover FiscalYear 2018 RecommendedBudget are as follows -
Highlightsof Overall Budget
BudgetReview - Operating Department & Division Summaries
CapitalInvestment Plan - FundingSource& Project Summaries
Thebudget document includes a format change with the addition of two new columns on the Fund Summaries and
theDepartments/Division
pages.The new formatrelaysthe amountsrequested,CityManager"s
Recommendation,
anda CouncilApprovedcolumn.We Iookforwardto presentingtheFiscalYear2017-2018Cityof DoverBudgeton
May 30, 2017.
Respectfully,
!,
5,,,,,.
Donna S. Mitchell
Acting City Manager
dmitchell@dover.de.us
(302) 736-7005
P.0. Box 475, Dover, DE 19903-0475
Community Excellence Through Quality Service
3
Page 9
FY 2018 DRAFT ANNUAL OPERATING BUDGET – DOVER, DELAWARE
VISION
The City of Dover is a place where people want to live! Through the team effort of its elected
officials, employees, and citizens, Dover is a clean and safe community, with a future of
balanced growth and opportunity where all citizens are heard, enjoy a high quality of life, and
diversity is valued.
4
Page 10
FY 2018 ANNUAL OPERATING BUDGET – DOVER, DELAWARE
CITY OF DOVER
FISCAL YEAR 2018 ORGANIZATION CHART
CITIZENS OF DOVER
MAYOR & COUNCIL
MAYOR COUNCIL
POLICE CITY SOLICITOR
PLANNING & COMMUNITY
CITY MANAGER CITY CLERK FINANCE FIRE TAX ASSESSOR
ENHANCEMENT SERVICES
ASSISTANT CITY MANAGER LIFE SAFETY
PROCUREMENT/INVENTORY
CUSTOMER SERVICES CODE ENFORCEMENT
CUSTOMER SERVICE INSPECTIONS/
PUBLIC WORKS PERMITTING
METER READING
PUBLIC WORKS
INFORMATION PLANNING
ADMINISTRATION
TECHNOLOGY
ENGINEERING & INSPECTIONS
LIBRARY COMMUNITY
DEVELOPMENT
GROUNDS LIBRARY
SANITATION HUMAN RESOURCES PARKS & RECREATION
STREETS ELECTRIC
FACILITIES MANAGEMENT ELECTRIC
ADMINISTRATION
FLEET MAINTENANCE
WATER/WASTEWATER SYSTEM OPERATIONS
ENGINEERING
WASTEWATER
MANAGEMENT ELECTRIC ENGINEERING
WATER MANAGEMENT
WATER TREATMENT ELECTRIC TRANSMISSION &
DISTRIBUTION 5
Page 12
City of Dover
Fiscal Year 2018
Recommended Budget
Highlights of Overall Budget
May 2017
7
Page 13
General Fund
Public Safety, General & Community Services
Police * Fire * Life Safety * Code Enforcement
Planning * Public Inspections * Library * Recreation
Streets * Sanitation * Tax Assessor
Support Services for all City Operations
Mayor * City Council * City Clerk * City Manager
Finance * Customer Service * Human Resources
Information Technology * Procurement & Inventory
Public Works Administration * Grounds
Facilities Management * Fleet Maintenance
8
Page 14
Water/Wastewater Utility
Engineering & Inspection
Water Distribution & Well Maintenance
Wastewater Distribution & Pump Station Maintenance
Water Treatment Plant
Capital Project Management
Electric Utility
Administration
Engineering & Inspection
Transmission & Distribution Maintenance
System Operations
Metering
Capital Project Management
9
Page 15
Policy Compliance
• Revenue Policy
• #7 – The City will project current revenues on a conservative basis so the actual revenues will
consistently meet or exceed budgeted revenues. Revenues greater or less than the original
budget will flow through to the audited Ending Budget Balance.
• Expenditure Policy
• #2 – The City will adopt a balanced budget, by fund, for all funds maintained by the City, in
which total anticipated revenues must equal or exceed the budgeted expenditures. The
Beginning Budget Balance will not be considered a revenue source.
• Budget Balance Policy – General Fund
• #1 – The City will strive to maintain a minimum Budget Balance, of at least 8% and no greater
than 12% of the current year operating revenues for the General Fund, excluding the carry
forward balance. (8.33% = 1 month, 12% = 45 days)
• Budget Balance Policy – Water & Wastewater Fund
• #1 – The City will strive to maintain a minimum Budget Balance, of at least 8% and no greater
than 17% of the current year operating revenues for the Water/Wastewater, excluding the
carry forward balance. (17% = 2 months)
• Budget Balance Policy – Electric Fund
• #1 – The City will strive to maintain a minimum Budget Balance, of at least 12% of the current
year operating revenues for the Electric Fund, excluding the carry forward balance.
10
Page 16
Policy Compliance (continued)
General Water Wastewater Water/Wastewater Electric
Fund Utility Utility Fund Fund *
Revenues $42,811,600 $6,573,200 $8,865,800 $15,439,000 $81,874,200
Expenses (42,793,000) (6,318,400) (8,783,700) (15,102,100) (80,947,000)
Surplus/(Deficit) $18,600 $254,800 $82,100 $336,900 $927,200
Ending Budget Balance $4,615,700 $1,585,700 $1,248,900 $2,834,600 $9,840,700
% of Revenue 10.8% 24.1% 14.1% 18.4% 12.0%
Beginning Budget Balance $4,597,100 $1,330,900 $1,166,800 $2,497,700 $20,290,200
Less PCA Credit (6,176,700)
Less Transfer to RSR (5,200,000)
Adjusted Budget Balance $8,913,500
Revenue Policy #7
Budget Balance Policy #1
Expenditure Policy #3
* The Electric Fund Revenues do not include the distribution of prior year's earnings $6.2 million from the FY17 Beginning Budget
Balance as rebated through a Power Cost Adjustment (PCA) credit; nor does it reflect $5.2 million of FY17 projected savings that
are recommended to be transferred to the Rate Stabilization Reserve until such time the Rate Design analysis is completed.
11
Page 17
City Revenue – Rates & Fees
• General Fund
Sanitation rate increase recommended from $17 to $21 a 23.5 %
increase to cover cost of service
Extra Duty Rate increases to cover cost of service
Development of a Public Safety Fee for mid-year consideration
• Water/Wastewater Fund
No proposed changes
• Electric Fund
Distribution of FY16 Excess Earnings to rate payers will be
processed as a Power Cost Adjustment Credit - $.00855 or 5.5%
12
Page 18
All Major Operating Funds
Personnel
• Pay increases in accordance with collective bargaining agreements
• Total Headcount
• Increased 4 full-time positions: 1 Budget Analyst & 3 Customer Service positions.
• Reduced 10 part-time positions: 5 Police cadets, 1 IT position, 2 Customer Service
positions, 4 City Manager positions offset by an increase for 2 Library positions.
• Personnel Cost Increases – $648,400 over the original FY17 budget
• Salary and wages increased $132,700
• Employer’s benefit cost increased $515,700 as follows
• FICA $9,900
• Health Care Premiums ($12,800) (includes Life, Indemnity & Disability premiums)
• Worker’s Compensation $51,900 (Last year of 3 year phase in of higher rates)
• Pension ($169,800) Other Post Employment Benefits (retirement medical) $636,500
• Aggregates all vacation sell-back and education assistance in Other Employment
Expenses
• Retirement payouts are recommended to be absorbed by attrition and new hires
on hold until such time the budget will cover the position. Exceptions will be
reviewed by the City Manager, Controller/Treasurer and Department Head.
• Cadet program does not have the grant funding to continue the program for all
six cadets, funding was secured for one 19 hour position at $13,500. Needed to
fund the five positions removed would be $67,500 (plus uniforms, etc.).
13
Page 19
Personnel Continued
• Discussion and potential action items
• Non-Bargaining pay increases
• Based on the CPI a 2% pay increase is recommended for Non-
Bargaining employees; The total wages and benefits equates to
approximately $88,400 across all Funds.
• Vacation Sell-Back
• The City has had a long standing personnel policy that permits
employees to sell back up to 80 vacation hours in the month of
November based on years of service.
• In FY17 the cost of this benefit was $303,800 with load
• 40 hours or less was $77,400
• Over 40 hours up to 80 hours was $226,400
• Discontinuance of this benefit requires inclusion in the collective
bargaining negotiations and Council action for non-bargaining
employees.
• Non-bargaining employee cost of this benefit was $56,300 in FY17 across
all Funds.
14
Page 20
General Fund Revenues
• Revenue increased as compared to the FY17 Original Budget
• $588,100 or 1.4%
• Major increases/(decreases) affecting revenues
• Transfer Taxes ($463,400)
• Reflects a potential rate change from 1.5% to 1.25%
• Extra Duty Grant Revenue ($198,600)
• Planning/Inspections Permits & Fees $293,900
• ($191,000 in Building Permits)
• Fines & Police Revenue ($84,700)
• Investment Income $48,000
• Sanitation Fees $542,100
• Recommended fee increase
• Court of Chancery $250,000
• Property Taxes $130,000 (growth related)
• Police Pension Grant ($85,000)
15
Page 21
General Fund Expenditures
• Expense increase over FY17 Original Budget – $569,500 or 1.3%
• Major increases/(decreases) affecting expenditures
(see Division summaries for details)
• Wages & Benefits $859,500
• Police Extra Duty ($223,600)
• Offset by revenue decrease
• Sanitation contractual services $428,600
• Insurance $35,000
• Increased fleet maintenance cost $50,000
• Other personnel cost & retiree medical $52,600
• Other operational cost increases and bank fees $43,000
• Debt Service ($242,200)
• Appropriation to Police Pension Grant ($85,000)
• Offset by revenue decrease
• Appropriation to Police Pension Fund $91,500
• Transfer to General Pension for COLA $48,400
• Transfer to the Capital Project Fund ($452,300)
• Transfer to Uncollectible Expense for demolitions $50,000
Note – list does not reflect adjustments to individual division budgets in order to balance this budget.
16
Page 22
FY18 Proposed Budget - General Fund Program Receipts & Expenditures
Outlays and Receipts (Property Taxes in as Public Safety) for Governmental Activities
Receipts Outlays
$25
$21.16
$20
$17.13
$15
Millions
$10
$8.41
$4.46
$5 $3.74
$2.89 $2.74 $2.60
$2.11
$1.07 $1.44
$0.58 $0.96
$0
General Public Safety Public Works Library & Central Services Financial Other Post
Government Recreation Administration Employment
Benefits
For the Year Ended June 30, 2018
17
Page 23
Property Taxes
PROPERTY ASSESSMENT PROJECTION
2015 BASE YEAR
TAXABLE ASSESSED VALUE AS OF APRIL 7 2017 $ 3,118,072,200.00
Annual Appeals (Exemption Requests that have been submitted) Estimate Only $ (318,200.00)
Annual Appeals Estimate of Appeals Estimate Only $ (5,000,000.00)
Senior Citizen/Disability Exemption Estimate Only $ (22,000,000.00)
TOTAL TAXABLE ASSESSED VALUE $ 3,090,754,000.00
CITY OF DOVER
PROJECTED PROPERTY TAX RECEIPTS
ACCRUAL METHOD OF ACCOUNTING
7/01/17 - 6/30/18
Using a tax of $0.405 per $100 of assessment, the estimated gross 7/01/17 billing will be: $ 12,517,553.70
Penalties $ 70,000.00
Estimated Quarterly Billing $ 28,000.00
PROJECTED PROPERTY TAX RECEIPT SUBTOTAL $ 12,615,600.00
Pay In Lieu of Taxes
Luther Towers $27,227; State of Delaware $312,243.52; Milford Housing $7,500 410,000
Delaware State Housing Authority $13,000; Dover Housing Authority $50,000
PROJECTED PROPERTY TAX RECEIPTS FOR FY 2017 $ 13,025,600.00
$0.01 of tax rate equates to: $ 309,075.40
18
Page 24
City of Dover, Delaware
Computation of Legal Debt Margin
General Obligation Bonds
(amounts expressed in thousands)
Estimated Estimated
2018 2017 2016 2015 2014 2013 2012
Debt Limit $ 154,538 $ 152,627 $ 155,396 $ 158,485 $ 157,995 $ 159,075 $ 158,465
Net (Taxable) Assessed Value on Books 3,090,754 3,052,549 3,107,912 3,169,707 3,159,894 3,181,496 3,169,308
Total net debt applicable to limit 5,877 6,210 6,783 7,337 4,050 4,479 1,550
Legal Debt Margin $ 148,661 $ 146,417 $ 148,613 $ 151,148 $ 153,945 $ 154,596 $ 156,915
Total Net Debt applicable to limit
as a percentage of debt limit 3.80% 4.07% 4.36% 4.63% 2.56% 2.82% 0.98%
Legal Debt Margin Calculation for Fiscal Year 2017
Net (Taxable) Assessed Value on Books $ 3,090,754 $ 3,052,549 $ 3,107,912 $ 3,169,707 $ 3,159,894 $ 3,181,496 $ 3,169,308
Debt Limit - 5 Percent of Total Assessed Value $ 154,538 $ 152,627 $ 155,396 $ 158,485 $ 157,995 $ 159,075 $ 158,465
DEBT
(For which the City's full faith and credit has been pledged)
Gross Bonded Debt 5,877 6,210 6,783 7,337 4,050 4,479 1,550
LEGAL DEBT MARGIN $ 148,661 $ 146,417 $ 148,613 $ 151,148 $ 153,945 $ 154,596 $ 156,915
IMPORTANT NOTE: The Total Net Debt applicable to the debt limit includes the remaining Series 2014 A Bonds (PNC) and the 2012 Bonds (PNC)
Source: City of Dover Financial Reports, City of Dover Charter, Section 50(b), and Tax Assessor's Office
New Bonds without referendum cannot exceed 1/4 of 1% of taxable assessed value and shall not cause the total aggregate principal outstanding at any one time to
exceed 1% of total taxable assessment for a general tax at the time of issue or $7,726,900 based on the 2018 Estimate.
19
Page 25
Water/Wastewater Fund
• Revenue decrease over FY17 Original Budget ($28,200) or -.2%
• Expense increase over FY17 Original Budget $934,100 or 6.5%
• Major increases/(decreases) affecting revenues
• Water Service fees $114,600
• Wastewater Service Fees ($32,000)
• Wastewater Treatment Fees ($47,100)
• Groundwater Inflow Adjustment ($38,300)
• Water Tank Space Leasing $25,200
• Impact Fees ($40,000)
• Major increases/(decreases) affecting expenses
• Wages & Benefits $55,000
• Water Treatment Plant contractual services $24,000
• Kent County Treatment fees ($203,500)
• Internal service allocations $46,000
• Debt Service – ($89,800) Deferred SRF Loans until projects are ready
• Transfer to Electric Fund – ($231,200)
• Transfers to reserves ($170,000)
• Increased Wastewater transfer to General Fund $25,000
• Capital Project Appropriations $1,200,000
20
Page 26
Electric Fund
• Revenue increase over FY17 Original Budget $647,600 or .8%
• Expense increase over FY17 Original Budget $1,925,500 or 2.4%
• Exclusive of transfer to the Rate Stabilization Reserve of $5.2 million for FY17 projected savings
• Major increases/(decreases) affecting revenues
• Customer sales increase $664,800
• Other revenue decreased ($17,200)
• Major increases/(decreases) affecting expenses
• Power Supply & Generation ($79,100)
• Wages & Benefits $17,600
• Operating expenses decreased ($176,000)
• Legal expenses and consulting services budgeted at $125,000 were moved to Other
Expenses for RFP’s and Legal services associated with power supply and generation
• Retiree health care $220,300 due to retirements
• Internal service allocations $60,100
• OPEB Appropriation towards unfunded liability $1.0 million
• Pension Appropriation towards unfunded liability $1.0 million
• Transfers to other accounts as follows
• Transfer to Rate Stabilization Reserve $5.2 million of projected favorability in FY17 Electric
Fund budget; to be incorporated into a potential phase in of the Rate Design Analysis to be
completed in FY18.
21
Page 27
City of Dover
Major Rate & Fee Trends
Actual Actual Actual Actual Actual Actual Actual Actual Budget Budget
GENERAL FUND 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18
Rolled Back/(Up) Property Tax Rate @ 100% value $0.3108 $0.3499
Property Tax Rate Approved $0.3300 $0.3300 $0.3378 $0.3378 $0.3378 $0.3378 $0.3378 $0.4050 $0.4050 $0.4050
Property Tax Rate Increase Proposed for revenue requirement $0.0551
Property Tax Rate Increase/(Decrease) (excluding 100% rollback/up) $0.0270 $0.0121
Trash Fees (in City) - implemented FY2000 $5.85 $5.85 $11.70 $11.70 $17.00 $17.00 $17.00 $17.00 $17.00 $21.00
Trash Fees (outside City) $29.00 $29.00 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $54.00
Transfer from Electric Utility 6.6% 6.5% 8.0% 8.0% $8 million $8 million $10 million $10 million $10 million $10 million
% of Electric Fund Revenues 8.3% 9.6% 12.5% 12.2% 12.3% 12.2%
% of General Fund Revenues 22.3% 22.5% 25.7% 23.9% 23.7% 23.4%
Transfer from Water/Wastewater Utility 5.0% 4.5% 0.0% 4.5% $500,000 $500,000 $500,000 $850,000 $875,000 $900,000
% of Water/Wastewater Fund Revenues 3.7% 3.6% 3.4% 5.7% 5.7% 5.8%
% of General Fund Revenues 1.4% 1.4% 1.3% 2.0% 2.1% 2.1%
WATER/WASTEWATER FUND
Water per 1,000 gal $2.45 $2.70 $3.00 $3.00 $3.00 $3.00 $3.00 $3.00 $3.00 $3.00
Water per 1,000 gal (Outside City) $3.68 $4.05 $4.50 $4.50 $4.50 $4.50 $4.50 $4.50 $4.50 $4.50
Water Flat Rate Charge (new source) $1.25 $1.25 $1.25 $1.25 $1.25 $1.25 $2.50 $2.50 $2.50 $2.50
Wastewater per 1,000 gal. Charge $2.10 $2.10 $2.65 $2.65 $2.65 $2.65 $2.65 $2.65 $2.65 $2.65
Wastewater per 1,000 gal (Outside City) $3.15 $3.15 $3.98 $3.98 $3.98 $3.98 $3.98 $3.98 $3.98 $3.98
Wastewater Flat Rate Charge (new source) $1.25 $1.25 $1.25 $1.25 $1.25 $1.25 $2.50 $2.50 $2.50 $2.50
Kent County Sewer Treatment Fee - Rate set by County $2.34 $2.34 $2.34 $2.34 $2.34 $2.34 $2.34 $2.34 $2.34 $2.34
Kent County Sewer Adjustment (new source for I & I - City) $1.05 $1.05 $1.05 $1.05 $1.50 $1.50 $1.50 $1.50
ELECTRIC FUND
Residential Rate Changes (includes any PCA adj.) $0.1450 $0.1450 $0.1407 $0.1364 $0.1316 $0.1204 $0.1204 $0.1203 $0.1203 $0.1203
Increase % 8.0% 0.0% -3.0% -3.1% -3.5% -8.5% 0.0% -0.1% 0.0% 0.0%
Power Cost Adjustment ($0.00252) ($0.00855)
Electric Fund Customer Charge $5.00 $5.00 $5.00 $5.00 $5.00 $5.00 $5.00 $7.50 $8.50 $8.50
Reconnect Fees $50 - $100 $50 - $100 $50 - $100 $50 - $100 $50 - $100 $50 - $100 $50 - $100 $50 - $100 $50 - $100 $50 - $100
Return Check Fees $25 $25 $25 $25 $25 $25 $25 $40 $40 $40
22
Page 28
City of Dover
Budget Workshop
Fiscal Year 2017-2018
Electric Fund PCA Credit
23
Page 29
Electric Fund – PCA Credit
• Recommended distribution of earnings $6,176,700 or
approximately 5.5% of revenue, result of lower cost of service
than projected for FY16.
• Key factors –
• Higher customer sales $.6 million
• Lower cost of power supply $7.4 million
• Higher generation cost $.6 million
• PCA Credit ($.00855) by customer class
• Monthly bill samples as follows
24
Page 30
Proposed
Units Current Billing Billing Adjustment Adjustment
Dover Air Force Base -$- -$- -$- -% -
Customer Charge - $/mo. - $ - $ - $ - 0.00%
Energy Charge - $/kWh - $ 0.06350 $ 0.06350 $ - 0.00%
Demand Charge - $/kW-mo. - $ 10.50 $ 10.50 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 0.00% 0.00%
Average Monthly Energy - kWh - 4,371,250 4,371,250
Average Monthly Billing Demand - kW - 8,283 8,283
Average Monthly Load Factor -% - 73.30% 73.30%
Customer Charge -$- $ - $ - $ - 0.00%
Energy Charges -$- $ 277,574.38 $ 277,574.38 $ - 0.00%
Demand Charges -$- $ 86,971.50 $ 86,971.50 $ - 0.00%
Subtotal - Base Rates $ 364,545.88 $ 364,545.88 $ - 0.00%
Purchased Power Adjustment -$- $ (11,015.55) $ (37,374.19) $ (26,358.64) 239.29%
Green Energy Fund Charges -$- $ 778.08 $ 778.08 $ - 0.00%
Utility Tax -$- $ - $ - $ - 0.00%
Total Bill $ 354,308.41 $ 327,949.77 $ (26,358.64) -7.44%
Proposed
Units Current Billing Billing Adjustment Adjustment
First State Power Mgmt. (NRG) -$- -$- -$- -% -
Customer Charge - $/mo. - $ 3,680.00 $ 3,680.00 $ - 0.00%
Energy Charge - $/kWh - $ 0.06370 $ 0.06370 $ - 0.00%
Demand Charge - $/kW-mo. - $ 10.50 $ 10.50 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 2.00% 2.00%
Average Monthly Energy - kWh - 163,117 163,117
Average Monthly Billing Demand - kW - 1,475 1,475
Average Monthly Load Factor -% - 15.36% 15.36%
Customer Charge -$- $ 3,680.00 $ 3,680.00 $ - 0.00%
Energy Charges -$- $ 10,390.55 $ 10,390.55 $ - 0.00%
Demand Charges -$- $ 15,487.50 $ 15,487.50 $ - 0.00%
Subtotal - Base Rates $ 29,558.05 $ 29,558.05 $ - 0.00%
Purchased Power Adjustment -$- $ (411.05) $ (1,394.65) $ (983.60) 239.29%
Green Energy Fund Charges -$- $ 29.03 $ 29.03 $ - 0.00%
Utility Tax -$- $ 583.52 $ 563.85 $ (19.67) -3.37%
Total Bill $ 29,759.55 $ 28,756.29 $ (1,003.27) -3.37%
25
Page 31
Proposed
Units Current Billing Billing Adjustment Adjustment
Kraft -$- -$- -$- -% -
Customer Charge - $/mo. - $ - $ - $ - 0.00%
Energy Charge - $/kWh - $ 0.06370 $ 0.06370 $ - 0.00%
Demand Charge - $/kW-mo. - $ 10.50 $ 10.50 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 2.00% 2.00%
Average Monthly Energy - kWh - 3,867,108 3,867,108
Average Monthly Billing Demand - kW - 6,642 6,642
Average Monthly Load Factor -% - 80.86% 80.86%
Customer Charge -$- $ - $ - $ - 0.00%
Energy Charges -$- $ 246,334.78 $ 246,334.78 $ - 0.00%
Demand Charges -$- $ 69,741.00 $ 69,741.00 $ - 0.00%
Subtotal - Base Rates $ 316,075.78 $ 316,075.78 $ - 0.00%
Purchased Power Adjustment -$- $ (9,745.11) $ (33,063.77) $ (23,318.66) 239.29%
Green Energy Fund Charges -$- $ 688.35 $ 688.35 $ - 0.00%
Utility Tax -$- $ 6,140.38 $ 5,674.01 $ (466.37) -7.60%
Total Bill $ 313,159.39 $ 289,374.36 $ (23,785.03) -7.60%
Proposed
Units Current Billing Billing Adjustment Adjustment
White Oak Solar -$- -$- -$- -% -
Customer Charge - $/mo. - $ - $ - $ - 0.00%
Energy Charge - $/kWh - $ 0.06370 $ 0.06370 $ - 0.00%
Demand Charge - $/kW-mo. - $ 10.50 $ 10.50 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 0.00% 0.00%
Average Monthly Energy - kWh - 18,092 18,092
Average Monthly Billing Demand - kW - 408 408
Average Monthly Load Factor -% - 6.16% 6.16%
Customer Charge -$- $ - $ - $ - 0.00%
Energy Charges -$- $ 1,152.46 $ 1,152.46 $ - 0.00%
Demand Charges -$- $ 4,284.00 $ 4,284.00 $ - 0.00%
Subtotal - Base Rates $ 5,436.46 $ 5,436.46 $ - 0.00%
Purchased Power Adjustment -$- $ (45.59) $ (154.69) $ (109.09) 239.29%
Green Energy Fund Charges -$- $ 3.22 $ 3.22 $ - 0.00%
Utility Tax -$- $ - $ - $ - 0.00%
Total Bill $ 5,394.09 $ 5,284.99 $ (109.09) -2.02%
26
Page 32
Proposed
Units Current Billing Billing Adjustment Adjustment
Procter & Gamble -$- -$- -$- -% -
Customer Charge - $/mo. - $ - $ - $ - 0.00%
Energy Charge - $/kWh - $ 0.06370 $ 0.06370 $ - 0.00%
Demand Charge - $/kW-mo. - $ 10.50 $ 10.50 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 2.00% 2.00%
Average Monthly Energy - kWh - 1,210,083 1,210,083
Average Monthly Billing Demand - kW - 1,950 1,950
Average Monthly Load Factor -% - 86.19% 86.19%
Customer Charge -$- $ - $ - $ - 0.00%
Energy Charges -$- $ 77,082.29 $ 77,082.29 $ - 0.00%
Demand Charges -$- $ 20,475.00 $ 20,475.00 $ - 0.00%
Subtotal - Base Rates $ 97,557.29 $ 97,557.29 $ - 0.00%
Purchased Power Adjustment -$- $ (3,049.41) $ (10,346.21) $ (7,296.80) 239.29%
Green Energy Fund Charges -$- $ 215.39 $ 215.39 $ - 0.00%
Utility Tax -$- $ 1,894.47 $ 1,748.53 $ (145.94) -7.70%
Total Bill $ 96,617.74 $ 89,175.00 $ (7,442.74) -7.70%
Proposed
Units Current Billing Billing Adjustment Adjustment
Small Commercial-1 Phase -$- -$- -$- -% -
Customer Charge - $/mo. - $ 7.50 $ 7.50 $ - 0.00%
Energy Charge - $/kWh - $ 0.10040 $ 0.10040 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 4.25% 4.25%
Average Monthly Energy - kWh - 836 836
Customer Charge -$- $ 7.50 $ 7.50 $ - 0.00%
Energy Charges -$- $ 83.93 $ 83.93 $ - 0.00%
Subtotal - Base Rates $ 91.43 $ 91.43 $ - 0.00%
Purchased Power Adjustment -$- $ (2.11) $ (7.15) $ (5.04) 239.29%
Green Energy Fund Charges -$- $ 0.15 $ 0.15 $ - 0.00%
Utility Tax -$- $ 3.80 $ 3.59 $ (0.21) -5.63%
Total Bill $ 93.28 $ 88.02 $ (5.26) -5.63%
27
Page 33
Proposed
Units Current Billing Billing Adjustment Adjustment
Small Commercial-3 Phase -$- -$- -$- -% -
Customer Charge - $/mo. - $ 22.50 $ 22.50 $ - 0.00%
Energy Charge - $/kWh - $ 0.10040 $ 0.10040 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 4.25% 4.25%
Average Monthly Energy - kWh - 1,313 1,313
Customer Charge -$- $ 22.50 $ 22.50 $ - 0.00%
Energy Charges -$- $ 131.83 $ 131.83 $ - 0.00%
Subtotal - Base Rates $ 154.33 $ 154.33 $ - 0.00%
Purchased Power Adjustment -$- $ (3.31) $ (11.23) $ (7.92) 239.29%
Green Energy Fund Charges -$- $ 0.23 $ 0.23 $ - 0.00%
Utility Tax -$- $ 6.43 $ 6.09 $ (0.34) -5.23%
Total Bill $ 157.68 $ 149.42 $ (8.25) -5.23%
Proposed
Units Current Billing Billing Adjustment Adjustment
Medium Commercial-1 Phase -$- -$- -$- -% -
Customer Charge - $/mo. - $ 7.50 $ 7.50 $ - 0.00%
Energy Charge - $/kWh - $ 0.06770 $ 0.06770 $ - 0.00%
Demand Charge - $/kW-mo. - $ 13.95 $ 13.95 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 4.25% 4.25%
Average Monthly Energy - kWh - 4,852 4,852
Average Monthly Billing Demand - kW - 18 18
Average Monthly Load Factor -% - 37.44% 37.44%
Customer Charge -$- $ 7.50 $ 7.50 $ - 0.00%
Energy Charges -$- $ 328.48 $ 328.48 $ - 0.00%
Demand Charges -$- $ 251.10 $ 251.10 $ - 0.00%
Subtotal - Base Rates $ 587.08 $ 587.08 $ - 0.00%
Purchased Power Adjustment -$- $ (12.23) $ (41.48) $ (29.26) 239.29%
Green Energy Fund Charges -$- $ 0.86 $ 0.86 $ - 0.00%
Utility Tax -$- $ 24.47 $ 23.22 $ (1.24) -5.08%
Total Bill $ 600.18 $ 569.68 $ (30.50) -5.08%
28
Page 34
Proposed
Units Current Billing Billing Adjustment Adjustment
Medium Commercial-3 Phase -$- -$- -$- -% -
Customer Charge - $/mo. - $ 22.50 $ 22.50 $ - 0.00%
Energy Charge - $/kWh - $ 0.06770 $ 0.06770 $ - 0.00%
Demand Charge - $/kW-mo. - $ 13.95 $ 13.95 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 4.25% 4.25%
Average Monthly Energy - kWh - 7,086 7,086
Average Monthly Billing Demand - kW - 23 23
Average Monthly Load Factor -% - 42.79% 42.79%
Customer Charge -$- $ 22.50 $ 22.50 $ - 0.00%
Energy Charges -$- $ 479.72 $ 479.72 $ - 0.00%
Demand Charges -$- $ 320.85 $ 320.85 $ - 0.00%
Subtotal - Base Rates $ 823.07 $ 823.07 $ - 0.00%
Purchased Power Adjustment -$- $ (17.86) $ (60.59) $ (42.73) 239.29%
Green Energy Fund Charges -$- $ 1.26 $ 1.26 $ - 0.00%
Utility Tax -$- $ 34.28 $ 32.46 $ (1.82) -5.30%
Total Bill $ 840.75 $ 796.21 $ (44.54) -5.30%
Proposed
Units Current Billing Billing Adjustment Adjustment
Large Commercial -$- -$- -$- -% -
Customer Charge - $/mo. - $ 22.50 $ 22.50 $ - 0.00%
Energy Charge - $/kWh - $ 0.06770 $ 0.06770 $ - 0.00%
Demand Charge - $/kW-mo. - $ 13.90 $ 13.90 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 4.25% 4.25%
Average Monthly Energy - kWh - 30,147 30,147
Average Monthly Billing Demand - kW - 90 90
Average Monthly Load Factor -% - 46.52% 46.52%
Customer Charge -$- $ 22.50 $ 22.50 $ - 0.00%
Energy Charges -$- $ 2,040.95 $ 2,040.95 $ - 0.00%
Demand Charges -$- $ 1,251.00 $ 1,251.00 $ - 0.00%
Subtotal - Base Rates $ 3,314.45 $ 3,314.45 $ - 0.00%
Purchased Power Adjustment -$- $ (75.97) $ (257.76) $ (181.79) 239.29%
Green Energy Fund Charges -$- $ 5.37 $ 5.37 $ - 0.00%
Utility Tax -$- $ 137.86 $ 130.14 $ (7.73) -5.60%
Total Bill $ 3,381.71 $ 3,192.20 $ (189.51) -5.60%
29
Page 35
Proposed
Units Current Billing Billing Adjustment Adjustment
Primary -$- -$- -$- -% -
Customer Charge - $/mo. - $ 15.00 $ 15.00 $ - 0.00%
Energy Charge - $/kWh - $ 0.06760 $ 0.06760 $ - 0.00%
Demand Charge - $/kW-mo. - $ 11.25 $ 11.25 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 2.00% 2.00%
Average Monthly Energy - kWh - 368,131 368,131
Average Monthly Billing Demand - kW - 918 918
Average Monthly Load Factor -% - 55.70% 55.70%
Customer Charge -$- $ 15.00 $ 15.00 $ - 0.00%
Energy Charges -$- $ 24,885.66 $ 24,885.66 $ - 0.00%
Demand Charges -$- $ 10,327.50 $ 10,327.50 $ - 0.00%
Subtotal - Base Rates $ 35,228.16 $ 35,228.16 $ - 0.00%
Purchased Power Adjustment -$- $ (927.69) $ (3,147.52) $ (2,219.83) 239.29%
Green Energy Fund Charges -$- $ 65.53 $ 65.53 $ - 0.00%
Utility Tax -$- $ 687.32 $ 642.92 $ (44.40) -6.46%
Total Bill $ 35,053.31 $ 32,789.09 $ (2,264.23) -6.46%
Proposed
Units Current Billing Billing Adjustment Adjustment
Residential -$- -$- -$- -% -
Customer Charge - $/mo. - $ 7.50 $ 7.50 $ - 0.00%
Energy Charge - $/kWh - $ 0.12030 $ 0.12030 $ - 0.00%
Purchased Power Adjustment - $/kWh - $ (0.00252) $ (0.00855) $ (0.00603) 239.29%
Green Energy Fund Charge - $/kWh - $ 0.00018 $ 0.00018 $ - 0.00%
Utility Tax Rate -% - 0.00% 0.00%
Average Monthly Energy - kWh - 816 816
Customer Charge -$- $ 7.50 $ 7.50 $ - 0.00%
Energy Charges -$- $ 98.16 $ 98.16 $ - 0.00%
Subtotal - Base Rates $ 105.66 $ 105.66 $ - 0.00%
Purchased Power Adjustment -$- $ (2.06) $ (6.98) $ (4.92) 239.29%
Green Energy Fund Charges -$- $ 0.15 $ 0.15 $ - 0.00%
Utility Tax -$- $ - $ - $ - 0.00%
Total Bill $ 103.75 $ 98.83 $ (4.92) -4.74%
30
Page 36
City of Dover
Budget Workshop
Fiscal Year 2017-2018
Sanitation Cost of Service Recommendation
31
Page 37
CITY OF DOVER
DEPARTMENT OF PUBLIC WORKS
FY 2017 / FY 2018 SANITATION RATE COMPARISON
KENT COUNTY, DELAWARE AND DOVER, DELAWARE COMPARISON
KENT COUNTY CITY OF DOVER (In City) CITY OF DOVER (Out of City)
SERVICE DESCRIPTION FY 2017 FY 2018 % FY 2017 FY 2018 % FY 2017 FY 2018 %
(monthly) (monthly) INCREASE (monthly) (monthly) INCREASE (monthly) (monthly) INCREASE
Trash
weekly
Recycling
$ 18.58 $ 23.75 27.83% n/a n/a n/a n/a n/a n/a
weekly
Bulk
4 items weekly
Trash
weekly
Recycling
weekly
$ 21.25 $ 26.04 22.54% n/a n/a n/a n/a n/a n/a
Yard Waste Can
weekly (in season)
Bulk
4 items weekly
Trash
weekly
Recycling
every other week
Yard Waste Can
n/a n/a n/a $ 17.00 $ 21.00 23.53% $ 42.75 $ 54.00 26.32%
weekly
Yard Waste Bulk
every other week
Household Bulk
every other week
32
Page 38
Private Company Rates
• Waste Management
• No Yard Waste Pickup
• Quarterly rates by location; $92.10 - $104.10 or
• $30.70 - $34.70 monthly
• Independent Disposal Services
• $35.00 non-refundable delivery charge for trach and recycle cans;
Bulk yard waste at an additional charge
• $23.00 monthly or $69.00 quarterly with one year service
contract
• Republic Services
• No Yard Waste Pickup
• Quarterly rate $79.00 or $26.33 monthly
33
Page 39
City of Dover
Sanitation Department
Scenario for Covering Full Cost
FY 2011 FY 2012 FY 2016 FY 2017 FY 2018 FY 2019
REVENUES Actual Actual Actual Budget Recommended Projection
Trash Revenue 2,172,700 $ 1,903,600 $ 2,527,500 $ 2,538,300 $ 3,080,400 $ 3,080,400
Revenue Adjustment - - - - - -
Total Revenues 2,172,700 1,903,600 2,527,500 2,538,300 3,080,400 3,080,400
EXPENDITURES
Personnel Costs 667,500 603,200 664,900 732,900 771,300 790,600
Materials & Supplies 48,800 88,400 27,400 24,700 33,800 34,100
Administrative Expenditures 181,600 175,500 121,900 117,400 109,700 110,800
Contractual Services 1,283,000 1,219,100 1,278,900 1,157,800 1,649,100 1,682,100
Overhead Charges (5%) 276,200 280,300 276,200 276,200 276,200 280,300
Depreciation Expense 185,300 185,300 199,700 225,400 225,400 225,400
Total Expenditures 2,642,400 2,551,800 2,569,000 2,534,400 3,065,500 3,123,300
Gain/(Loss) (469,700) (648,200) (41,500) 3,900 14,900 (42,900)
Budget FTE Headcount 13 12 10 10 10 10
Capital Outlay 212,500 120,600 402,500 261,500 - -
Current Rates & Revenues Required Rates & Revneues
Rate # of Accts. Monthly Annual Rate Monthly Annual
In City Rates $17.00 9,915 $168,600.00 $2,023,200.00 $21.00 $208,200.00 $2,498,400.00
Rates vary depending on size of can $19.00 285 5,400.00 64,800.00 $24.00 6,800.00 81,600.00
and number of pickups/cans $34.00 13 400.00 4,800.00 $43.00 600.00 7,200.00
$57.00 238 13,600.00 163,200.00 $72.00 17,100.00 205,200.00
$68.00 3 200.00 2,400.00 $85.00 300.00 3,600.00
$114.00 31 3,500.00 42,000.00 $143.00 4,400.00 52,800.00
Out of City Rates $42.75 184 7,900.00 94,800.00 $54.00 9,900.00 118,800.00
$142.50 2 300.00 3,600.00 $179.00 400.00 4,800.00
$0.00 - - - $0.00 - -
10,671 $199,900.00 $2,398,800.00 $621.00 $247,700.00 $2,972,400.00
Bulk Pick Up $11,625.00 $139,500.00 $9,000.00 $9,000.00 $108,000.00
$211,525.00 $2,538,300.00 $9,621.00 $256,700.00 $3,080,400.00
Average Revenue per account $19.82 $237.87 Residential w/ 1 can = $48.00 per year
Average Revenue needed to cover cost of service $24.90 $298.78
% Increase 25.6% 125.6%
34
Page 40
CITY OF DOVER
DEPARTMENT OF PUBLIC WORKS
FY 2018 SANITATION AND STREETS BUDGET ITEM PROPOSAL
STREET SWEEPING DEBRIS, LEAF MULCH, WOOD CHIPS AND YARD WASTE DISPOSAL
SANITATION - CONTRACTUAL SERVICES - 110-1800-555.30-31
2017-2018 2017-2018 2017-2018 2017-2018
LINE ITEM DETAIL COMMENTS
REQUESTED RECOMMENDED PROPOSAL PROPOSAL PHASED
DSWA 11,900 TONS @ $70.00/TON (DOMESTIC WASTE) $ 833,000 $ 833,000 $ 833,000 $ 833,000
RECYCLING SERVICES (9,400 CON @ 1.21 PER @ 26 WKS) $ 295,800 $ 295,800 $ 295,800 $ 295,800 1
YARD WASTE DISPOSAL (RESIDENTIAL COLLECTION) $ 80,000 $ 80,000 $ 170,000 $ 170,000 2, 3, 10
ALLIED WASTE DOWNTOWN DUMPSTER $ 11,700 $ 11,700 $ 11,700 $ 11,700
STREET SWEEPING DEBRIS DISPOSAL (ANNUAL) $ - $ - $ 50,400 $ 50,400 4, 10
STREET SWEEPING DEBRIS DISPOSAL (STOCKPILE) $ - $ - $ 158,200 $ 79,100 5, 10
LEAF MULCH DISPOSAL (ANNUAL) $ - $ - $ 85,000 $ 85,000 6, 10
LEAF MULCH DISPOSAL (STOCKPILE) $ - $ - $ 170,000 $ 85,000 7, 10
WOOD CHIP AND BULK TREE DISPOSAL (ANNUAL) $ - $ - $ 8,500 $ 8,500 8, 10
WOOD CHIP AND BULK TREE DISPOSAL (STOCKPILE) $ - $ - $ 61,200 $ 30,600 9, 10
$ 1,220,500 $ 1,220,500 $ 1,843,800 $ 1,649,100
1 - Recycling Services RFP will not be back in time to address any changes in the FY 2018 Budget (proposals due 5-9-17)
2 - Yard Waste Disposal - FY 2018 Requested based upon EZ Mulch using 800 loads @ $100 per load
3 - Yard Waste Disposal - FY 2018 Proposal based upon DSWA using 2,000 tons @ $85.00/ton
4 - Street Sweeping Debris Annual Disposal - FY 2018 Proposal based upon DSWA using 60 tons/month @ $70.00/ton
5 - Street Sweeping Debris Stockpile Disposal - FY 2018 Proposal based upon DSWA using 2,260 tons @ $70.00/ton (Phased = 2 years)
6 - Leaf Mulch Annual Disposal - FY 2018 Proposal based upon DSWA using 1,000 tons (1 pile) @ $85.00/ton
7 - Leaf Mulch Stockpile Disposal - FY 2018 Proposal based upon DSWA using 2,000 tons (2 piles) @ $85.00/ton (Phased = 2 years)
8 - Wood Chip Annual Disposal - not previously budgeted for - FY 2018 Proposal based upon DSWA using 100 tons @ $85.00/ton
9 - Wood Chip Stockpile Disposal - stockpile created over many years by Electric tree contractor and Grounds Division, Electric Department will need to
budget for material disposal - FY 2018 Proposal based upon DSWA using 720 tons @ $85.00/ton (Phased = 2 years)
10 - all volumes and weights have been estimated by DPW staff to the best of their ability - values are not exact
35
Page 41
City of Dover
Budget Workshop
Fiscal Year 2017-2018
Police Extra Duty Cost of Service Recommendation
36
Page 42
Extra Duty Rates
Background
• In August 2016 the City increased
the Extra Duty Rates to capture 2016/17
the increased cost of service for Actual to date
the program. Special events are
provided a lower rate due to POLICE EXTRA DUTY (369-16) (351-17 = FY13) $ 187,803
lower overhead with the premise POLICE E.D. RELATED GRANTS (362.71 = FY13) 211,385
that the non-special event rates TOTAL RELATED REVENUES 399,188
and vehicle charges will offset
any revenue shortfall. Finance
POLICE EXTRA DUTY (Division 544) (407,543)
performed an analysis through
March 2017 to determine if the
revised rates were covering the NET EXTRA DUTY REVENUE/(EXPENSE) $ (8,355)
cost of service. This analysis
includes extra duty billings for
March, not recorded until April.
• This shortfall does not reflect the
cost of dispatchers and other
overheads, officers pay only.
37
Page 43
Recommended Rates 6/30/17
City of Dover
Billing Rates for Special Events (Spectator’s over 5,000)
Officer Total
Billing Overhead Hourly
Rate Rate Rate
Special Event Rate – Officers $62.00 $64.00 $3.00 $4.00 $65.00 $68.00
Special Event Rate – Dispatchers S/T $23.00 $24.00 $3.00 $4.00 $26.00 $28.00
Special Event Rate – Dispatchers O/T $34.00 $35.00 $3.00 $4.00 $37.00 $39.00
City of Dover
Officer Extra Duty Billing Rates for Non-Special Events
Officer Total
Billing Overhead Hourly
Rate Rate Rate
Extra Duty Rate $59.00 $61.00 $8.00 $9.00 $67.00 $70.00
Vehicles Actively Used on Extra Duty Jobs - Hourly Rate $ 16.25
38
Page 44
City of Dover
Budget Workshop
Fiscal Year 2017-2018
Public Safety Fee Recommendation
39
Page 45
Public Safety Fee
• Tax exempt properties • Revenue
• Billed monthly or • Based on current tax rolls
annually • State, Schools, & Non-Profits
• Rate @ $.01 = $128,500
• Rate to be approved by
• Non-State $99,800
City Council • State $28,700
• Public Hearings
• Rate @ $.03 = $385,700
• Ordinance
• Non-State $299,500
Development • State $86,200
• Adoption by 01/01/18
40
Page 46
City of Dover
Budget Workshop
Fiscal Year 2017-2018
Retirement Benefits
41
Page 47
Recommended COLA – General Employee Plan Retirees
Financial Impact of Ad-Hoc Cost of Living Increase
Date of Most Recent Actuarial Valuation - 7/1/2016
Effective 7/1/2017 for Those Retired as of 7/1/2016
Increase Total General W/WW Electric
% Cost Fund Fund Fund
Option 1 - Fully Fund in Year of Increase 1.00% $413,635 $227,176 $35,049 $151,410
(Increase in Liability) 1.50% $620,452 $340,766 $52,572 $227,114
2.00% $827,268 $454,355 $70,095 $302,818
Option 2 - Amortize Liability Increase 1.00% $43,990 $24,160 $3,728 $16,102
(15 year amortization) 1.50% $65,986 $36,240 $5,592 $24,154
2.00% $87,982 $48,322 $7,455 $32,205
42
Page 48
Health Care Premium Trends
Increase Increase Increase Increase
(decrease) (decrease) (decrease) (decrease)
over prior over prior over prior over prior
7/1/2017 year 7/1/2016 year 7/1/2015 year 7/1/2014 year 7/1/2013
BC/BS First State Basic Plan First State Employ $ 732.84 0.000% $ 732.84 5.305% $ 695.92 20.067% $ 579.61 0.374% $ 577.45
First State Employ & Spouse $ 1,513.32 0.000% $ 1,513.32 5.313% $ 1,436.98 20.115% $ 1,196.34 0.373% $ 1,191.89
First State Employ & Child $ 1,112.59 0.000% $ 1,112.59 5.310% $ 1,056.49 20.099% $ 879.68 0.373% $ 876.41
First State Employ & Family $ 1,891.05 0.000% $ 1,891.05 5.316% $ 1,795.60 20.124% $ 1,494.79 0.373% $ 1,489.23
Aetna CDH Gold Aetna Gold Employ $ 758.37 0.000% $ 758.37 5.306% $ 720.16 20.069% $ 599.79 0.372% $ 597.57
Aetna Gold Employ & Spouse $ 1,569.55 0.000% $ 1,569.55 5.315% $ 1,490.34 20.115% $ 1,240.76 0.374% $ 1,236.14
Aetna Gold Employ & Child $ 1,157.25 0.000% $ 1,157.25 5.310% $ 1,098.90 20.101% $ 914.98 0.373% $ 911.58
Aetna Gold Employ & Family $ 1,993.25 0.000% $ 1,993.25 5.316% $ 1,892.63 20.125% $ 1,575.55 0.375% $ 1,569.66
BC/BS CDH Gold BC/BS Gold Employ $ 758.37 0.000% $ 758.37 5.306% $ 720.16 20.069% $ 599.79 0.372% $ 597.57
BC/BS Gold Employ & Spouse $ 1,569.55 0.000% $ 1,569.55 5.315% $ 1,490.34 20.115% $ 1,240.76 0.374% $ 1,236.14
BC/BS Gold Employ & Child $ 1,157.25 0.000% $ 1,157.25 5.310% $ 1,098.90 20.101% $ 914.98 0.373% $ 911.58
BC/BS Gold Employ & Family $ 1,993.24 0.000% $ 1,993.24 5.316% $ 1,892.63 20.125% $ 1,575.55 0.375% $ 1,569.66
Aetna HMO Aetna Employ $ 764.94 0.000% $ 764.94 5.303% $ 726.42 20.069% $ 605.00 0.373% $ 602.75
Aetna Employ & Spouse $ 1,609.82 0.000% $ 1,609.82 5.314% $ 1,528.59 20.118% $ 1,272.57 0.375% $ 1,267.82
Aetna Employ & Child $ 1,168.76 0.000% $ 1,168.76 5.310% $ 1,109.83 20.101% $ 924.08 0.375% $ 920.63
Aetna Employ & Family $ 2,008.02 0.000% $ 2,008.02 5.314% $ 1,906.69 20.127% $ 1,587.23 0.374% $ 1,581.31
BC/BS BlueCARE HMO Blue Care HMO Employ $ 765.56 0.000% $ 765.56 5.301% $ 727.02 20.073% $ 605.48 0.371% $ 603.24
Blue Care HMO Employ & Spouse $ 1,614.90 0.000% $ 1,614.90 5.314% $ 1,533.42 20.117% $ 1,276.60 0.374% $ 1,271.84
Blue Care HMO Employ & Child $ 1,169.92 0.000% $ 1,169.92 5.310% $ 1,110.93 20.101% $ 925.00 0.373% $ 921.56
Blue Care HMO Family $ 2,014.16 0.000% $ 2,014.16 5.315% $ 1,912.51 20.126% $ 1,592.09 0.375% $ 1,586.14
BC/BS Comp PPO Comp PPO Employ $ 836.26 0.000% $ 836.26 5.305% $ 794.13 20.079% $ 661.34 0.372% $ 658.89
Comp PPO Employ & Spouse $ 1,732.42 0.000% $ 1,732.42 5.316% $ 1,644.97 20.120% $ 1,369.44 0.374% $ 1,364.34
Comp PPO Employ & Child $ 1,287.34 0.000% $ 1,287.34 5.312% $ 1,222.41 20.106% $ 1,017.78 0.375% $ 1,013.98
Comp PPO Employ & Family $ 2,165.08 0.000% $ 2,165.08 5.316% $ 2,055.80 20.129% $ 1,711.32 0.374% $ 1,704.94
Medicfill With Prescription $ 485.06 7.640% $ 450.63 7.260% $ 420.13 9.818% $ 382.57 6.887% $ 357.92
Without Prescription $ 256.66 0.004% $ 256.65 7.219% $ 239.37 9.798% $ 218.01 6.841% $ 204.05
43
Page 49
Medicare B Trends
Eligible to receive • Recommendation to
Medicare Part B cap Medicare B
Reimbursements premiums for all
• Non-union and AFSCME eligible recipients at
employees hired prior to $200 per month.
7/28/09
• IBEW employees who Medicare Part B Standard Rates
retired prior to 7/1/09 Year New Enrollee % Incr Currently Enrolled % Incr
• DOE employees who 2017 $
2016 $
134.00 10.0% $
121.80 16.1% $
109.00 3.9%
104.90 0.0%
retired prior to 1/31/10 2015 $ 104.90 $ 104.90
• FOP employees who
2014 $ 104.90 $ 104.90
2013 $ 104.90 $ 104.90
retired prior to 9/30/06
44
Page 50
BUDGET REVIEW
Fiscal Year 2017-2018
Operating Department & Division Summaries
May 2017 – Budget Review Hearing
45
Page 51
What You Need to Know
• Percentage changes are calculated on FY17 Original Budgets
• All Department budgets reflect the following in personnel expenses:
– Vacation sell-back and education assistance are budgeted in a separate fund expense
account in order to reduce the overall amount budgeted for personnel expenses.
– Overall net benefit cost increased by $515,700 in the proposed budget.
– Health Insurance premiums remain the same.
– OPEB rates significantly increased with the inclusion of two years of premium increases of
approximately 25% in the latest actuary valuation.
– Pension cost decreased for the General Fund and Electric Fund, and increased for the
Water/Wastewater Fund. This is a result of actuary recommended increases offset by
General Pension Plan employee’s retirements combined with new hires with the 401a
benefit. In essence, retiree cost is going up and active employee cost is going down.
– Actuarial determined contribution for the OPEB and pension liabilities are included in the
pension contribution percentage.
– Worker’s Compensation Rates increased.
46
Page 52
GENERAL FUND
BUDGET REVIEW
Fiscal Year 2017-2018
47
Page 53
Mayor
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 57,300 57,300 57,300 - 0%
Materials & Supplies 300 300 300 - 0%
Administrative Exp 16,400 16,300 16,300 - -1%
Total Operating Exp $ 74,000 $ 73,900 $ 73,900 $ - 0%
Highlights:
Personnel costs remained constant.
Materials and Supplies remained constant.
Administrative Expenses remained about the same with a small decrease in gasoline.
There has been no increase in the Mayor’s budget for Economic Development at this
time.
48
Page 54
City Council
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 91,000 91,000 91,000 - 0%
Materials & Supplies 300 300 1,300 - 333%
Administrative Exp 49,800 52,800 62,800 - 26%
Total Operating Exp $ 141,100 $ 144,100 $ 155,100 $ - 10%
Highlights:
Personnel Costs remained constant.
Materials and Supplies increased $1000 for the purchase of 2 iPads.
Administrative Expenditures increased $13,000; $3,000 for discretionary funds
for Council Members and $10,000 for a Diversity Study.
49
Page 55
City Manager
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 503,300 511,300 558,200 - 11%
Materials & Supplies 8,400 14,500 13,800 - 64%
Administrative Exp 280,700 176,300 175,500 - -37%
Total Operating Exp 792,400 702,100 747,500 - -6%
Highlights:
Personnel Costs have increased $54,900 overall for a Budget Analyst position
offset by reduction of 4 part-time temporary positions.
Materials and supplies increased by $5,400 which included an increase in
expenses of $7,100 for maintenance and warranty on the new video & production
equipment offset by decreases in printing and computer hardware.
Administrative Expenditures budget decreased by $105,200. Legal expenses
$9,000, economic development cost $90,400 and contractual services $5,000.
50
Page 56
City Clerk
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 372,800 382,400 382,400 - 3%
Materials & Supplies 9,200 15,000 12,200 - 33%
Administrative Exp 30,300 42,000 35,300 - 17%
Total Operating Exp 412,300 439,400 429,900 - 4%
Highlights:
Personnel Costs increased $9,600 for benefit cost increases.
Materials and supplies expense has a small increase of $3,000 due to increases in
computer software (4 Word Perfect upgrades) and office supplies.
Administrative expenditures has a net increase of $5,000 due to an increase of
$16,500 for agenda management software offset by a decrease of $9,000 in election
related expenses and small decreases in training, office equipment/repairs and
subscriptions and dues.
51
Page 57
Customer Services
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 1,077,200 1,154,400 1,111,400 - 3%
Materials & Supplies 32,600 35,800 32,300 - -1%
Administrative Exp 34,000 35,600 22,500 - -34%
Total Operating Exp 1,143,800 1,225,800 1,166,200 - 2%
Highlights:
Personnel costs had a net increase of $34,200 due recruitment of 3 full-time and 2
part-time positions.
Materials and supplies has a small decrease of $300 in computer software.
Administrative expenses has a decrease of $11,500 due to a reduction in credit card
fees which are now budgeted in bank fees.
52
Page 58
Finance
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 811,600 833,200 833,200 - 3%
Materials & Supplies 2,700 5,600 4,200 - 56%
Administrative Exp 196,800 199,300 191,700 - -3%
Total Operating Exp 1,011,100 1,038,100 1,029,100 - 2%
Highlights:
Personnel costs increased by $21,600 mainly attributed to benefit cost increases.
Materials and supplies increased $1,500 mainly due to a PC replacement.
Administrative expenses had a net decrease of $5,100 due to reduction in cost for audit
offset by increase in cost for ADP fees due to a contract increase and additional
headcount.
53
Page 59
Procurement & Inventory
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 314,000 330,000 330,000 - 5%
Materials & Supplies 13,900 17,200 16,000 - 15%
Administrative Exp 257,200 257,100 256,500 - 0%
Total Operating Exp 585,100 604,300 602,500 - 3%
Highlights:
Personnel costs increased $16,000 due to benefit cost increases.
Materials and Supplies had a net increase of $2,100 due to an increase of $2,700 for
building repairs and fences offset by small decreases in computer software, office
supplies and furniture/fixtures.
Administrative expenditures had a net decrease of $700.
54
Page 60
Fire
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 437,700 442,300 442,400 - 1%
Administrative Exp 284,000 367,500 332,500 - 17%
Total Operating Exp 721,700 809,800 774,900 - 7%
Capital Outlay 145,700 184,100 184,100 - 26%
Total Expenditures $ 867,400 $ 993,900 $ 959,000 $ - 11%
Highlights:
Personnel Costs increased $4,700 due to increases in benefits costs.
Administrative Expenditures increased $48,500 due to administrative and maintenance
increases.
Capital Expenses totaled $184,100 for the annual loan payment on Ladder 1 and the
replacement of Engine 7.
55
Page 61
Human Resources
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 345,100 362,700 362,700 362,700 5%
Materials & Supplies 29,400 36,300 29,000 29,000 -1%
Administrative Exp 18,000 102,500 38,600 38,600 114%
Total Operating Exp 392,500 501,500 430,300 430,300 10%
Highlights:
Personnel Costs have increased overall by $17,600 due to benefit cost increases.
Materials and Supplies had a net decrease of $400.
Administrative Expenditures increased $20,600 due to an increase of $14,400 in
advertisement expense and $7,500 for diversity training offset by small decreases in
subscriptions and dues and in-house training.
Please, note Advertisement Expense was requested at $76,000 and Diversity Training was requested at $15,000.
These requests were in light of City Council discussions for broadening our employment advertisements and
concerns expressed on our diversity efforts.
56
Page 62
Information Technology
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 441,400 454,700 436,700 - -1%
Materials & Supplies 98,700 97,500 94,800 - -4%
Administrative Exp 176,200 175,700 242,700 - 38%
Total Operating Exp 716,300 727,900 774,200 - 8%
Capital Outlay - 50,600 36,600 - 0%
Total Expenditures $ 716,300 $ 778,500 $ 810,800 $ - 13%
Highlights:
Personnel Costs decreased due to the combination of eliminating the AS400
programmer, Administrative Assistant, and taking the LAN Tech from a part-time
position to a full-time position.
Materials and supplies had a net decrease of $3,900 in various accounts.
Administrative Expenditures increased $66,500 mainly in contractual services for a
trainer to help with ERP implementation in lieu of hiring a programmer.
Capital Outlay includes $36,600 for a Backup and Recovery System with software
$15,000 and Network infrastructure $21,600.
57
Page 63
Library
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 1,369,000 1,420,700 1,418,800 - 4%
Materials & Supplies 58,900 75,600 83,800 - 42%
Administrative Exp 207,100 223,600 207,100 - 0%
Total Operating Exp 1,635,000 1,719,900 1,709,700 - 5%
Highlights:
Personnel Costs increased by $49,800 mainly due to recruitment of 2 part-time positions
and a net increase in benefits costs. The projected cost of the passport operations is offset
by projected revenue. Currently the recommended budget has this operation as breakeven.
Materials & Supplies increased overall by $24,900 mainly for increases of $18,800 in books
and $8,500 for passport supplies offset by decreases in security/safety materials and
water/sewer expense.
Administrative expenditures remained constant.
Note – There is the possibility that the Library Grant may be affected by the State’s budget. This is another $200K plus
accounted for the in the Library Grant Fund and not reflected above.
58
Page 64
Parks & Recreation
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 499,500 512,700 512,700 - 3%
Materials & Supplies 57,000 59,000 57,700 - 1%
Administrative Exp 194,400 202,300 192,500 - -1%
Total Operating Exp 750,900 774,000 762,900 - 2%
Capital Outlay 165,000 241,000 271,000 - 64%
Total Expenditures $ 915,900 $ 1,015,000 $ 1,033,900 $ - 13%
Highlights:
Personnel Costs increased $13,200 mainly due to benefit cost increases.
Materials & Supplies expenditures have increased overall by $700 due to increases in computer
hardware and software offset by decreases printing and maintenance supplies.
Administrative Expenditures decreased overall by $1,900 due to a reduction in electricity and
gasoline offset by increases in contractual services, training and telephone expense.
Capital Outlay totaled $271,000 for park and playground improvements. Matching Grant $33K.
Note – Park Master Plans that have not had cost estimates developed are not included in the recommended
budget and will require a budget amendment if the project can be completed in the fiscal year. The source of
funds will be the Parkland Reserve.
59
Page 65
Police
Budget Requested Recommended Approved Change
Personnel Costs 15,630,200 15,898,000 15,806,900 - 1%
Materials & Supplies 370,600 385,000 340,500 - -5%
Administrative Exp 874,400 954,100 828,500 - -4%
Total Operating Exp 16,875,200 17,237,100 16,975,900 - 1%
Capital Outlay 299,800 2,218,400 379,900 - 20%
Total Expenditures 17,175,000 19,455,500 17,355,800 - 2%
Highlights:
Personnel Costs increased by $176,700 due to an increase in wages and benefits as follows – Civilian
Division $10,600; Law Enforcement $104,100; offset by a decrease Extra Duty $197,800.
Materials and Supplies had a net decrease of $30,100 for reductions in computer hardware and
software due to fewer vehicle purchases, CI petty cash disbursements, medical supplies and
physicals, books, security/safety materials, animal care, computer software and water/sewer offset
by increases in furniture/fixtures, printing, custodial services and City Bldg. Maintenance supplies.
Administrative Expenses had a net decrease of $45,900 due to reductions in contractual services,
training, gasoline, postage, electricity and heating oil/gas offset by increases in subscriptions, office
equipment repairs/maintenance and radio equipment.
Capital Outlay of $379,900 includes a roof repair $53,100, impound lot $51,000 and purchase of
vehicles $275,800.
60
Page 66
Tax Assessor
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 217,900 209,000 209,000 - -4%
Materials & Supplies 2,500 3,500 3,400 - 36%
Administrative Exp 23,600 24,800 24,400 - 3%
Total Operating Exp 244,000 237,300 236,800 - -3%
Capital Outlay - 18,200 - - 0%
Total Expenditures $ 244,000 $ 255,500 $ 236,800 $ - -3%
Highlights:
Personnel decreased $8,900 due to wage and net benefit cost decreases (Health
insurance decrease $12,800 and OPEB & Pension increases $5,700).
Materials and Supplies had a small increase of $900 in computer hardware for a
desktop.
Administrative Expenses had an overall increase of $800 in contractual services and
subscription and dues.
Note – A vehicle purchased in the City Manager’s department in FY16 with limited
usage was transferred to the Assessor and the requested vehicle was removed.
61
Page 67
Planning/Inspections &
Community Development
62
Page 68
Planning
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 513,100 532,300 532,300 - 4%
Materials & Supplies 13,300 14,600 12,300 - -8%
Administrative Exp 20,400 19,800 16,900 - -17%
Total Operating Exp 546,800 566,700 561,500 - 3%
Capital Outlay - 16,000 - - 0%
Total Expenditures $ 546,800 $ 566,700 $ 561,500 $ - 3%
Highlights:
Personnel Costs increased by $19,200 due to wage $400 and benefit increases
$18,700.
Materials & Supplies expenditures decreased $1,000 in computer hardware.
Administrative expenditures decreased $3,500 for training and subscription and
dues offset by a small increase in telephone expense.
63
Page 69
Inspections & Permitting
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 503,600 526,700 526,700 - 5%
Materials & Supplies 2,200 3,700 2,200 - 0%
Administrative Exp 192,100 491,300 192,100 - 0%
Total Operating Exp 697,900 1,021,700 721,000 - 3%
Capital Outlay - 16,000 - - 0%
Total Expenditures $ 697,900 $ 1,037,700 $ 721,000 $ - 3%
Highlights:
Personnel Costs increased $23,100 due to wage increases and higher benefit costs.
Materials & Supplies remains constant to FY17.
Administrative Expenses remains constant to FY17.
Note – The Planner originally included a $300,000 increase in demolition expenses
to partner with Central Delaware Habitat for Humanity on their Strong
Neighborhood Housing Fund.
64
Page 70
Code Enforcement
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 396,300 420,300 420,300 - 6%
Materials & Supplies 18,300 21,100 20,600 - 13%
Administrative Exp 6,500 7,500 6,800 - 5%
Total Operating Exp 421,100 448,900 447,700 - 6%
Capital Outlay - 23,800 - - 0%
Total Expenditures $ 421,100 $ 472,700 $ 447,700 $ - 6%
Highlights:
Personnel Costs increased $24,000 due to wage $6,400 and benefit cost increases.
Materials & Supplies increased $2,300 for vest replacements with expiration dates.
Administrative Expenditures had a net increase of $300 due to a $1,400 increase for
phone lines for tablets offset by decreases in contractual services and gasoline.
65
Page 71
Life Safety
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 231,600 232,800 232,800 - 1%
Materials & Supplies 300 10,800 10,300 - 3333%
Administrative Exp 253,300 257,200 254,800 - 1%
Total Operating Exp 485,200 500,800 497,900 - 3%
Capital Outlay 29,500 - - - -100%
Total Expenditures $ 514,700 $ 500,800 $ 497,900 $ - -3%
Highlights:
Personnel Costs increased $1,200 due to lower wages attributed to staff changes
$10,200 offset by benefit increases.
Materials & Supplies increased $10,000 for security/safety materials for turn out gear
and vests with expiration dates, as well as increases in program expenses/supplies and
code books.
Administrative Expenses increased $1,500 for telephone/fax, subscriptions and dues
and training for new inspector.
66
Page 73
Public Works Admin
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 661,600 687,700 682,900 - 3%
Materials & Supplies 6,900 11,400 9,400 - 36%
Administrative Exp 11,500 18,800 18,800 - 63%
Total Operating Exp 680,000 717,900 711,100 - 5%
Highlights:
Personnel Costs increased by $21,300 due to wage and benefit increases,
particularly pension and OPEB costs.
Materials & Supplies increased $2,500 in computer hardware and furniture and
fixtures offset by a small decrease in computer software.
Administrative Expenditures increased $7,300 mainly due to an increase in
contractual services for $7,000 for ARGIS software support that renews every other
year.
68
Page 74
Facilities Management
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 459,500 483,700 483,700 - 5%
Materials & Supplies 24,400 26,200 22,500 - -8%
Administrative Exp 123,200 129,700 123,500 - 0%
Total Operating Exp 607,100 639,600 629,700 - 4%
Capital Outlay 27,700 25,100 25,100 - -9%
Total Expenditures $ 634,800 $ 664,700 $ 654,800 $ - 3%
Highlights:
Personnel Costs increased $24,200 due to wage and benefit cost increases.
Materials and Supplies decreased $1,900 in city building maintenance supplies and
water/sewer.
Administrative Expenditures increased $300 due an increase of $6,500 in contractual services
for an HVAC contract offset by decreases in electricity and heating oil/gas.
Capital outlay includes $25,100 for purchase of a vehicle.
69
Page 75
Fleet Maintenance
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 466,200 494,600 494,600 - 6%
Materials & Supplies 304,100 290,600 337,900 - 11%
Administrative Exp 6,000 6,100 4,200 - -30%
Total Operating Exp 776,300 791,300 836,700 - 8%
Capital Outlay 31,000 27,000 - - -100%
Total Expenditures $ 807,300 $ 818,300 $ 836,700 $ - 4%
Highlights:
Personnel Costs increased $28,400 due to wages and benefit costs.
Materials and Supplies increased $33,800 due to a $50,000 increase in program
expenses/supplies offset by decreases in small tools, uniforms, security/safety
materials, and computer hardware and software.
Administrative Expenses decreased $1,800 in training/travel, radio repairs and
maintenance, contractual services and telephone expense.
Note – Program expenses and supplies is the account all parts and maintenance items are charged to for the City’s
vehicles and equipment. This account has run over budget for the past several years and the $50,000 adjustment
is to bring the budget in line with the historical cost of service, rather than continue budget overages.
70
Page 76
Grounds
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 953,400 907,900 905,400 - -5%
Materials & Supplies 53,200 55,400 45,900 - -14%
Administrative Exp 194,700 199,200 189,300 - -3%
Total Operating Exp 1,201,300 1,162,500 1,140,600 - -5%
Capital Outlay 58,200 62,500 62,500 - 7%
Total Expenditures $ 1,259,500 $ 1,225,000 $ 1,203,100 $ - -4%
Highlights:
Personnel Costs decreased $48,000 as a result of attrition offset by a net decrease in
benefit costs, particularly health insurance and pension costs related to attrition.
Materials & Supplies decreased $7,300 due to reductions in program expenses/supplies,
custodial expenses, uniforms and water/sewer expenses.
Administrative Expenditures decreased by $5,400 due to reductions in maintenance
equipment repairs, telephone and heating oil/gas offset by small increases in
subscriptions and dues and environmental expenses.
Capital expenses includes a new mower and utility tractor.
71
Page 77
Sanitation
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 732,900 771,300 771,300 - 5%
Materials & Supplies 24,700 34,400 33,800 - 37%
Administrative Exp 1,275,200 1,337,900 1,758,800 - 38%
Total Operating Exp 2,032,800 2,143,600 2,563,900 - 26%
Capital Outlay 261,500 435,100 - - -100%
Total Expenditures $ 2,294,300 $2,578,700 $ 2,563,900 $ - 12%
Highlights:
Personnel Costs increased $38,400 due to wages and benefit increases, mainly pension
and OPEB costs.
Materials & Supplies increased $9,100 due to a $10,000 increase in program
expenses/supplies for trash cans offset by a small decrease in uniforms.
Administrative Expenses increased $483,600 mainly due to an increase of $491,300 in
contractual services along with small increases in telephone and radio repairs and
maintenance offset by decreases in gasoline and environmental expenses.
72
Page 78
Streets
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 589,000 656,500 656,500 - 11%
Materials & Supplies 247,000 427,700 198,000 - -20%
Administrative Exp 327,500 322,600 263,900 - -19%
Total Operating Exp 1,163,500 1,406,800 1,118,400 - -4%
Capital Outlay 1,026,000 5,110,500 1,070,000 - 4%
Total Expenditures $ 2,189,500 $ 6,517,300 $ 2,188,400 $ - 0%
Highlights:
Personnel costs increased $67,500 due to wages and benefits, mainly pension and OPEB costs.
Materials and supplies have decreased by $49,000 mostly in program expenses.
Administrative expenses decreased $63,600 mainly in contractual services along with decreases
in gasoline and consulting fees offset by increases in temp help, telephone and training.
Capital Outlay includes $950,000 for street and alley program, $70,000 for miscellaneous storm
sewer repairs, and $50,000 for Dover Library conveyance system improvements.
73
Page 79
Public Works - Engineering
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 203,600 222,100 255,500 - 25%
Materials & Supplies 900 1,300 900 - 0%
Administrative Exp 2,500 20,400 20,100 - 704%
Total Operating Exp 207,000 243,800 276,500 - 34%
Highlights:
Personnel costs increased $51,900 due to having a full year budget for all three
positions versus 10 months in the prior year.
Materials and supplies remained constant.
Administrative expenditures increased $17,600 mainly in contractual services for
the Silver Lake Dam annual inspection and a small increase in training offset by
small decreases in telephone and gasoline.
74
Page 80
WATER/WASTEWATER FUND
BUDGET REVIEW
Fiscal Year 2017-2018
May 2017 – Budget Review Hearing
75
Page 81
Water/Wastewater Engineering
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 453,600 443,700 450,100 - -1%
Materials & Supplies 16,300 16,900 16,600 - 2%
Administrative Exp 46,600 60,600 47,300 - 2%
Total Operating Exp 516,500 521,200 514,000 - 0%
Capital Outlay 30,400 - - - -100%
Total Expenditures $ 546,900 $ 521,200 $ 514,000 $ - -6%
Highlights:
Personnel costs decreased $3,500 with wage increases $5,400, overtime decrease
$500 and net benefit decreases of $8,400.
Materials & Supplies had a minimal increase of $300 with small changes in
computer hardware, security/safety materials, small tools and books.
Administrative expenditures had a small increase of $700 with an increase in
training of $6,400 offset by decreases in gasoline, contractual services $5,000
and telephone/fax.
76
Page 82
Water Management
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 527,400 528,100 528,100 - 0%
Materials & Supplies 71,800 73,400 67,500 - -6%
Administrative Exp 56,200 52,900 37,800 - -33%
Total Operating Exp 655,400 654,400 633,400 - -3%
Capital Outlay 1,338,800 1,685,700 1,608,400 - 20%
Total Expenditures $ 1,994,200 $ 2,340,100 $ 2,241,800 $ - 12%
Highlights:
Personnel costs had a small increase of $700 with an increase in wages offset by a net decrease in
benefit costs.
Materials & Supplies decreased by $4,300 due to small decreases in water/sewer system supplies,
computer hardware, security/safety materials and uniforms offset by an increase of $2,300 in
small tools.
Administrative Expenditures decreased $18,400 for gasoline, consulting fees $2,000, contractual
services $15,000, and maintenance equip repairs offset by increases in training and subscriptions.
Capital Expenses totaled $1,608,400 and includes projects for water quality improvements, meter
replacement, wellhead redevelopment, miscellaneous emergency water repairs and purchases in
maintenance equipment. Miscellaneous project funds were reduced to reflect historical trend.
77
Page 83
Wastewater Management
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 654,400 668,400 668,400 - 2%
Materials & Supplies 88,200 90,400 82,200 - -7%
Administrative Exp 219,800 222,600 212,200 - -3%
Total Operating Exp 962,400 981,400 962,800 - 0%
Capital Outlay 2,021,200 2,468,500 1,543,000 - -24%
Total Expenditures $ 2,983,600 $ 3,449,900 $ 2,505,800 $ - -16%
Highlights:
Personnel costs increased $14,000 due to increase in wages and net benefit cost increases.
Materials & Supplies decreased $6,000 in pumping station and water/sewer supplies,
security/safety materials, uniforms, computer hardware and chemicals and additives and small
increases for small tools and water/sewer.
Administrative Expenses decreased $22,200 in gasoline, electricity, and radio repairs and
maintenance.
Capital Expenses totaled $1,543,000 which includes projects for the meter replacement
program, SCADA equipment, inflow/infiltration removal, Lepore Road sewer upgrade and
Puncheon Run pumping station improvements. Miscellaneous project funds were reduced to
reflect historical trends. Projects not fully engineered and designed were moved out to the next
year. 78
Page 84
Water Treatment
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 1,040,100 1,083,900 1,083,900 - 4%
Materials & Supplies 159,800 171,400 160,900 - 1%
Administrative Exp 527,500 568,500 534,000 - 1%
Total Operating Exp 1,727,400 1,823,800 1,778,800 - 3%
Capital Outlay 1,200,000 1,598,100 - - -100%
Total Expenditures $ 2,927,400 $ 3,421,900 $ 1,778,800 $ - -39%
Highlights:
Personnel costs increased $43,800 for wages and net benefit cost increase.
Materials & Supplies had a small increase of $1,100 which included $5,000 for
siding replacement on well houses and decreases in uniforms, small tools and
computer hardware.
Administrative Expenditures increased $6,500 due to UCMR monitoring
requirement of $24,000 offset by a decrease of $15,000 in electricity and various
other expenses.
Note – The Water Treatment Plant rehabilitation project has been moved to FY19 until such time the forecast
model can be updated to reflect the budgetary increase and how the capital cost will be financed and the
potential affects on water rates. 79
Page 85
ELECTRIC FUND
BUDGET REVIEW
Fiscal Year 2017-2018
May 2017 – Budget Review Hearing
80
Page 86
Electric Administration
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 479,700 477,600 473,200 - -1%
Materials & Supplies 149,500 150,600 167,900 - 12%
Administrative Exp 300,500 302,600 153,700 - -49%
Total Operating Exp 929,700 930,800 794,800 - -15%
Capital Outlay - 1,183,700 8,500 - 0%
Total Expenditures $ 929,700 $ 2,114,500 $ 803,300 $ - -14%
Highlights:
Personnel Costs decreased $2,100 due to reduction in salaries for 2 positions offset by a net increase in benefit
costs.
Materials and Supplies increased $18,400 mainly due to an $18,700 increase in city building maintenance on
Weydandt Hall.
Administrative expenses decreased by $146,800 due to a decrease in legal expenses of $125,000 (moved to a fund
expense $25,000), and consulting fees of $25,000 offset by an increase in contractual services of $4,000.
Capital Outlay increased $8,500 for piping and thermostat wiring for heat pumps in the Administrative Office
Building.
Note – The requested budget included the replacement of the HVAC equipment at Weyandt Hall. Once building
assessments and pricing are completed this item may be presented at a later date.
81
Page 87
Electric T&D
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 2,652,500 2,670,900 2,689,100 - 1%
Materials & Supplies 434,600 453,600 422,600 - -3%
Administrative Exp 518,600 525,300 487,900 - -6%
Total Operating Exp 3,605,700 3,649,800 3,599,600 - 0%
Capital Outlay 1,975,000 2,428,000 1,725,500 - -13%
Total Expenditures $ 5,580,700 $ 6,077,800 $ 5,325,100 $ - -5%
Highlights:
Personnel costs increased $36,600 due to step increases in accordance with the labor
agreement.
Materials & Supplies decreased $12,000 due to $26,200 decrease in electric
materials/supplies offset by an increase of $14,000 to compensate for DAFB solar
project.
Administrative Expenses decreased $30,700 in contractual services.
Capital Outlay is for New Developments, meter test bench replacement, switchgear
replacement, a pickup truck and a knuckleboom replacement.
82
Page 88
Electric Engineering
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 941,500 924,900 923,600 - -2%
Materials & Supplies 61,000 72,000 62,500 - 2%
Administrative Exp 245,400 306,200 237,000 - -3%
Total Operating Exp 1,247,900 1,303,100 1,223,100 - -2%
Capital Outlay 910,700 3,680,700 1,315,000 - 44%
Total Expenditures $ 2,158,600 $ 4,983,800 $ 2,538,100 $ - 18%
Highlights:
Personnel Costs decreased $17,900 overall due to the retirement of an employee that was in the
employee pension plan offset by wage increases for step increases and net benefit decreases.
Materials & Supplies increased by $1,500 mainly due to an increase in computer hardware of
$10,800 which includes 3 Dell Toughbooks offset by a reduction of $9,000 in electric
materials/supplies.
Administrative Expenses decreased by $8,400 in training, equip/radio repairs, and gasoline.
Capital Outlay includes advanced metering infrastructure, distribution upgrades, and various
other projects totaling $1,315,000.
83
Page 89
Meter Reading
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 350,600 419,100 363,000 - 4%
Materials & Supplies 14,900 16,500 14,200 - -5%
Administrative Exp 13,100 13,900 13,800 - 5%
Total Operating Exp 378,600 449,500 391,000 - 3%
Capital Outlay 41,800 - - - -100%
Total Expenditures $ 420,400 $ 449,500 $ 391,000 $ - -7%
Highlights:
Personnel costs increased by $12,400 for benefit costs.
Materials and Supplies remained about the same with a small decrease in tools.
Administrative Expenses remained about the same with small increases in other
equipment repairs/maintenance and radio repairs/maintenance.
84
Page 90
Systems Operations
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 651,700 644,700 644,700 - -1%
Total Expenditures $ 651,700 $ 644,700 $ 644,700 $ - -1%
Highlights:
Personnel Costs decreased due to decreases in benefit costs offset by wage
increases.
85
Page 91
Power Plant Operations
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
Personnel Costs 3,654,000 3,598,400 3,516,900 - -2%
Materials & Supplies 244,200 315,500 231,000 - 29%
Administrative Exp 2,317,500 2,572,800 2,398,600 - 11%
Total Operating Exp 6,215,700 6,486,700 6,146,500 - 4%
Capital Outlay 1,842,800 2,990,000 2,328,000 - 62%
Total Expenditures $ 8,058,500 $ 9,476,700 $ 8,474,500 $ - 18%
Highlights:
Personnel Costs decreased for wages and burden due to retirement of units 1 & 2 and the
burden cost adjusted downward to be reflective of historical cost .
Materials & Supplies decreased by $69,200 due to decreases in computer hardware, city
building maintenance expense and Water/Sewer expense.
Administrative Expenses increased by $81,100 with large variations in many line items,
most notable increases of $65,000 for Operator insurance, $42,500 environment
expenses offset by a decreases in training $12,500 and fire protection system $12,500.
Capital Outlay increased and includes 8 projects totaling $2,328,000 for McKee Run and
Van Sant plants.
86
Page 92
Power Supply
2016-2017 2017-2018 2017-2018 2017-2018 %
Budget Requested Recommended Approved Change
65 Series Supply Mgmt and Incentive Fees 996,000 835,000 960,000 - -4%
95 Series Purchases, Capacity, and PJM Charges 41,639,900 40,628,300 41,276,200 - -1%
98 Fuel 302,600 1,614,600 817,400 - 170%
Total Expenditures $ 42,938,500 $ 43,077,900 $ 43,053,600 $ - 0%
Highlights:
The budget includes power supply & risk management services, estimated power supply and
fuel costs for Fiscal 2018. It is recommended that the associated contractual services and
legal expenses for power supply and generation be transferred into this division from the
Administrative division.
87
Page 93
Final Discussion and Wrap-Up
88
Page 94
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
City of Dover
All Funds Summary
Fiscal 2018 Proposed Recommended Budget
Fund or Beginning Revenues/ Expenses/ Ending
Reserve Account Balances Transfers In Transfers Out Balances
1 General Fund
2 Operating Fund $ 4,597,100 $ 42,811,600 $ (42,793,000) $ 4,615,700
3 Contingency Account 743,600 10,800 - 754,400
4 Capital Project Fund 412,900 2,071,700 (2,029,200) 455,400
5 Capital Asset Reserve 1,525,700 (399,800) - 1,125,900
6 Parkland Reserve 376,300 4,900 (205,000) 176,200
7 Total General Fund 7,655,600 44,499,200 (45,027,200) 7,127,600
8 Water/Wastewater Fund
9 Operating Fund 2,497,700 15,439,000 (15,102,100) 2,834,600
10 Contingency Account 527,800 9,600 - 537,400
11 I & E Fund 3,237,100 3,293,200 (3,151,400) 3,378,900
12 Capital Asset Reserve 1,053,200 15,300 - 1,068,500
13 Impact Fee Reserve 3,159,300 46,300 - 3,205,600
14 Total Water Fund 10,475,100 18,803,400 (18,253,500) 11,025,000
15 Electric Fund
16 Operating Fund * 14,113,500 81,874,200 (86,147,000) 9,840,700
17 Contingency Account 863,500 13,800 - 877,300
18 Insurance Reserve 775,800 12,400 - 788,200
19 Rate Stabilization Reserve 10,635,500 5,370,200 - 16,005,700
20 I & E Fund 6,600,300 5,479,800 (6,877,000) 5,203,100
21 Depreciation Reserve 13,042,800 208,700 - 13,251,500
22 Future Capacity Reserve 13,197,700 211,200 - 13,408,900
23 Total Electric Fund 59,229,100 93,170,300 (93,024,000) 59,375,400
24 Less:
25 Interfund Operating Transfers (10,900,000) 10,900,000
Capital and Reserve Transfers (9,812,100) 9,812,100
26 Interfund Allocations 5,324,800 (5,324,800)
28 Subtotal Major Operating Funds 77,359,800 141,085,600 (140,917,400) 77,528,000
29 Workers Compensation 1,487,800 926,800 (739,800) 1,674,800
30 Community Transportation Fund 85,200 500,000 (500,000) 85,200
31 Police Grants 72,400 358,000 (421,500) 8,900
32 Library Grants - 284,200 (284,200) -
33 CDBG 2,100 216,700 (216,700) 2,100
34 Total All Funds & Reserves $ 79,007,300 $ 143,371,300 $ (143,079,600) $ 79,299,000
Notes: Special Revenue Funds with receipts that pass over to the General Fund are not individually included.
These are Municipal Street Aid, Civil Traffic Penalties, and Transfer Taxes.
* The Electric Fund Revenues do not include the distribution of prior year's earnings $6.2 million from the FY17
Beginning Budget Balance as rebated through a Power Cost Adjustment (PCA) credit; nor does it reflect $5.2
million of FY17 projected savings that are recommended to be transferred to the Rate Stabililzation Reserve
until such time the Rate Design analysis is completed.
89
Page 95
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GENERAL FUND
CASH RECEIPT SUMMARY
2016/17 $ DIFFERENCE % CHG
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET FY17 VS
1 BEGINNING BALANCE 4,820,414 4,493,900 5,424,800 4,597,100 4,597,100 - 103,200 2.3%
2 FINES AND POLICE REVENUE 659,418 763,300 605,900 740,600 678,600 - (84,700) -11.1%
3 LIBRARY REVENUES 67,078 70,300 98,200 65,000 100,000 - 29,700 42.2%
4 KENT COUNTY BOOK REIMBURSEMENT 352,599 312,600 269,900 300,000 300,000 - (12,600) -4.0%
5 BUSINESS LICENSES 1,475,794 1,467,000 1,460,000 1,467,000 1,467,000 - - 0.0%
6 PERMITS AND OTHER FEES 1,756,849 1,662,100 1,771,700 1,831,000 1,956,000 - 293,900 17.7%
7 MISCELLANEOUS CHARGES 60,626 56,800 80,500 57,000 57,000 - 200 0.4%
8 POLICE EXTRA DUTY 559,929 525,000 525,000 500,000 500,000 - (25,000) -4.8%
9 PROPERTY TAXES 12,846,772 12,895,100 12,926,100 13,025,600 13,025,600 - 130,500 1.0%
10 RECREATION REVENUE 183,174 150,000 177,700 150,000 150,000 - - 0.0%
11 FRANCHISE FEE 684,540 680,000 686,700 688,100 688,100 - 8,100 1.2%
12 SANITATION FEES 2,527,478 2,538,300 2,513,300 2,510,700 3,080,400 - 542,100 21.4%
13 RENT REVENUE - GARRISON FARM 93,858 94,500 95,700 96,900 96,900 - 2,400 2.5%
14 COURT OF CHANCERY FEES 1,239,300 1,100,000 1,305,600 1,350,000 1,350,000 - 250,000 22.7%
15 INVESTMENT INCOME 171,806 90,000 148,400 138,000 138,000 - 48,000 53.3%
16 RECEIPTS SUBTOTAL 22,679,221 22,405,000 22,664,700 22,919,900 23,587,600 - 1,182,600 5.3%
17 INTERFUND SERVICE RECEIPTS
18 INTERFUND SERVICE RECEIPTS W/WW 1,426,018 1,653,800 1,673,400 1,706,000 1,699,800 - 46,000 2.8%
19 INTERFUND SERVICE RECEIPTS ELECTRIC 3,640,969 3,564,900 3,625,900 3,640,900 3,625,000 - 60,100 1.7%
20 INTERFUND SERVICE RECEIPTS SUBTOTAL 5,066,987 5,218,700 5,299,300 5,346,900 5,324,800 - 106,100 2.0%
21 GRANTS:
22 POLICE RELATED/EXTRA DUTY 159,017 258,600 258,600 60,000 60,000 - (198,600) -76.8%
23 POLICE PENSION GRANT 415,128 500,000 415,200 415,000 415,000 - (85,000) -17.0%
24 GREEN ENERGY GRANT 98,500 98,500 98,500 98,500 98,500 - - 0.0%
25 MISC GRANT REVENUE 8,933 25,000 3,800 25,000 25,000 - - 0.0%
26 CABLE FRANCHISE GRANT 50,000 - - - - - - 0.0%
27 HISTORIC DISTRICT GRANT - - - 6,500 6,500 - 6,500 0.0%
28 GRANTS SUBTOTAL 731,578 882,100 776,100 258,600 605,000 - (277,100) -31.4%
29 TRANSFERS FROM:
30 TRANSFER TAX 2,188,634 1,672,700 1,457,000 1,672,700 1,209,300 - (463,400) -27.7%
31 MUNICIPAL STREET AID 673,377 673,100 673,100 673,100 673,100 - - 0.0%
32 CIVIL TRAFFIC PENALTIES 468,793 496,900 470,000 511,800 511,800 - 14,900 3.0%
33 WATER/WASTEWATER 850,000 875,000 875,000 900,000 900,000 - 25,000 2.9%
34 ELECTRIC 10,000,000 10,000,000 10,000,000 10,000,000 10,000,000 - - 0.0%
35 OTHER RESERVES 15,911 - - - - - 0.0%
36 TRANSFERS FROM SUBTOTAL 14,196,715 13,717,700 13,475,100 13,757,600 13,294,200 - (423,500) -3.1%
37 TOTAL REVENUES 42,674,501 42,223,500 42,215,200 42,283,000 42,811,600 - 588,100 1.4%
38 TOTAL BEGINNING BALANCE & REVENUE 47,494,915 46,717,400 47,640,000 46,880,100 47,408,700 - 691,300 1.5%
90
Page 96
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GENERAL FUND
EXPENSE SUMMARY
2016/17 $ DIFFERENCE % CHG
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET FY17 VS
1 DEPARTMENT EXPENSES:
2 CITY CLERK 370,101 412,300 416,200 439,400 429,900 - 17,600 4.3%
3 COUNCIL 100,129 141,100 141,100 144,100 155,100 - 14,000 9.9%
4 TAX ASSESSOR 237,364 244,000 247,400 237,300 236,800 - (7,200) -3.0%
5 FIRE 686,947 721,700 721,700 809,800 774,900 - 53,200 7.4%
6 GROUNDS MAINTENANCE 1,056,855 1,201,300 1,201,300 1,162,500 1,140,600 - (60,700) -5.1%
7 LIBRARY 1,430,640 1,635,000 1,666,700 1,719,900 1,709,700 - 74,700 4.6%
8 RECREATION 713,462 750,900 757,300 774,000 762,900 - 12,000 1.6%
9 LIFE SAFETY 491,402 485,200 488,200 500,800 497,900 - 12,700 2.6%
10 CODE ENFORCEMENT 396,097 421,100 425,100 448,900 447,700 - 26,600 6.3%
11 PLANNING 516,303 546,800 552,800 566,700 561,500 - 14,700 2.7%
12 INSPECTIONS 726,661 697,900 701,000 1,021,700 721,000 - 23,100 3.3%
13 ECONOMIC DEVELOPMENT 240,057 - - - - - - 0.0%
14 POLICE 15,951,661 16,091,600 16,298,300 16,677,000 16,415,900 - 324,300 2.0%
15 POLICE EXTRA DUTY 683,859 783,600 804,500 560,100 560,000 - (223,600) -28.5%
16 STREETS 667,574 1,163,500 1,166,100 1,406,800 1,118,400 - (45,100) -3.9%
17 SANITATION 2,093,043 2,032,800 2,036,400 2,143,600 2,563,900 - 531,100 26.1%
18 CITY MANAGER 917,201 792,400 796,400 702,100 747,500 - (44,900) -5.7%
19 INFORMATION TECHNOLOGY 603,226 716,300 720,000 727,900 774,200 - 57,900 8.1%
20 FINANCE 979,550 1,011,100 1,017,600 1,038,100 1,029,100 - 18,000 1.8%
21 PUBLIC WORKS - ADMINISTRATION 552,815 680,000 682,300 717,900 711,100 - 31,100 4.6%
22 FACILITIES MANAGEMENT 665,827 607,100 610,500 639,600 629,700 - 22,600 3.7%
23 PUBLIC WORKS - ENGINEERING 166,579 207,000 207,000 243,800 276,500 - 69,500 33.6%
24 PROCUREMENT & INVENTORY 558,220 585,100 585,100 604,300 602,500 - 17,400 3.0%
25 FLEET MAINTENANCE 791,913 776,300 777,600 791,300 836,700 - 60,400 7.8%
26 CUSTOMER SERVICE 1,037,886 1,143,800 1,244,300 1,225,800 1,166,200 - 22,400 2.0%
27 HUMAN RESOURCES 366,812 392,500 401,400 501,500 430,300 - 37,800 9.6%
28 MAYOR 74,861 74,000 74,000 73,900 73,900 - (100) -0.1%
29 DEPARTMENT SUBTOTALS 33,077,045 34,314,400 34,740,300 35,878,800 35,373,900 - 1,059,500 3.1%
30 OTHER EXPENDITURES:
31 DEBT SERVICE 672,389 685,300 685,300 443,100 443,100 - (242,200) -35.3%
32 CONTRIBUTION TO DDP 70,000 150,000 150,000 150,000 150,000 - - 0.0%
33 MISCELLANEOUS GRANT RELATED EXP - 25,000 25,000 25,000 25,000 - - 0.0%
34 INSURANCE 680,148 700,000 700,000 735,000 735,000 - 35,000 5.0%
35 RETIREES HEALTH CARE 1,567,700 2,039,700 2,039,700 2,063,000 2,063,000 - 23,300 1.1%
36 OTHER EMPLOYMENT EXPENSES - 400,700 95,800 490,000 430,000 - 29,300 7.3%
37 BANK & CREDIT CARD FEES 7,346 15,000 15,000 21,000 21,000 - 6,000 40.0%
38 UNCOLLECTIBLES - TRASH AND OTHER 350,000 50,000 50,000 100,000 100,000 - 50,000 100.0%
39 STREET LIGHTS 804,246 804,000 804,000 810,000 810,000 - 6,000 0.7%
40 NEW PROPERTIES ACQUISITIONS 240,362 - - - - - - 0.0%
41 OTHER EXPENSE SUBTOTAL 4,392,191 4,869,700 4,564,800 4,837,100 4,777,100 - (92,600) -1.9%
42 TRANSFERS
43 TRANSFER TO CAPITAL ASSET RESERVE 229,600 - 253,400 - - - - 0.0%
44 TRANSFER TO CAPITAL FUND - PROJECTS 2,625,400 1,859,400 2,304,400 8,255,300 1,407,100 - (452,300) -24.3%
45 APPROP. TO THE POLICE PENSION FUND 415,128 670,000 670,000 761,500 761,500 - 91,500 13.7%
46 APPROP. POLICE PENSION - STATE GRANT 676,500 500,000 500,000 415,000 415,000 - (85,000) -17.0%
47 APPROP. TO THE GENERAL PENSION FUND 594,300 - - - 48,400 - 48,400 0.0%
48 TRANSFER TO ELECTRIC I & E FUND - - - 322,300 - - - 0.0%
49 TRANSFER TO OTHER/CABLE FRANCHISE RESV 50,000 - - - - - - 0.0%
50 TRANSFER TO INVENTORY WRITE-OFFS 10,000 10,000 10,000 10,000 10,000 - - 0.0%
51 TRANSFERS SUBTOTAL 4,600,928 3,039,400 3,737,800 9,764,100 2,642,000 - (397,400) -13.1%
52 TOTAL EXPENDITURES 42,070,164 42,223,500 43,042,900 50,480,000 42,793,000 - 569,500 1.3%
53 BUDGET BALANCE 5,424,751 4,493,900 4,597,100 (3,599,900) 4,615,700 - 121,800 2.7%
54 TOTAL BUDGET BALANCE & EXPENDITURES 47,494,915 46,717,400 47,640,000 46,880,100 47,408,700 - 691,300 1.5%
55 EXCEEDS/(REMAINS)TO MEET REQUIREMENT 2,010,800 1,116,000 1,219,900 (6,982,500) 1,190,800 -
2016/17 $ DIFFERENCE
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS
56 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET POLICY
57 CONTINGENCY 732,833 741,000 743,600 754,400 754,400 - 13,400 $700K
91
Page 97
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2017/2018
General Fund Revenue
GRANTS
3.0%
COURT OF
CHANCERY FEES
POLICE FINES & 3.2%
FEES
LICENSES & 3.9% FRANCHISE FEES
PERMITS 1.6%
8.0%
LIBRARY &
TRANSFER TAXES RECREATION FEES
2.8% 1.3%
OTHER
SANITATION FEES MISCELLANEOUS
7.2% RECEIPTS
0.7%
INTERFUND
SERVICE FEES
12.4%
PROPERTY TAXES
30.4%
UTILITY TRANSFERS
25.5%
92
Page 98
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2017/2018
General Fund Expenditures
By Major Function
TRANSFER TO
CAPITAL PROJECTS
3.3%
DEBT SERVICE INSURANCE CITY
1.0% 1.7% ADMINISTRATION
STREET LIGHTS OTHER 4.3%
1.9% 1.4% LIBRARY &
RETIREE PENSION RECREATION
CONTRIBUTIONS 5.8%
2.9% PLANNING &
INSPECTIONS
RETIREE MEDICAL 5.2%
CONTRIBUTIONS
4.8%
PUBLIC WORKS
17.0%
FINANCIAL
ADMINISTRATION
9.2% POLICE & FIRE
41.5%
Several General Fund Departments service all City operations. The General Fund bills the utility funds
services provided. The receipts are reported as revenue in the General Fund and not netted against the
expenditures.
93
Page 99
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2017/2018
General Fund Expenditures
By Expenditure Category
RETIREE PENSION
CONTRIBUTIONS STREET LIGHTS DEBT SERVICE
2.9% 1.9% 1.1%
INSURANCE
RETIREE MEDICAL 1.8%
CONTRIBUTIONS
4.9% CAPITAL
ADMINISTRATIVE 3.4%
EXPENSES
7.0% OTHER
0.7%
MATERIALS &
SUPPLIES
3.3%
PERSONNEL SERVICES
73.1%
94
Page 100
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PROJECTED COST PER CAPITA BY FUNCTION
Fiscal Year 2017-2018
OTHER $16.38
TRANSFER TO CAPITAL PROJECTS $37.48
INSURANCE $19.58
DEBT SERVICE $11.80
STREET LIGHTS $21.58
RETIREE PENSION CONTRIBUTIONS $32.63
RETIREE MEDICAL CONTRIBUTIONS $54.95
PUBLIC WORKS $193.84
FINANCIAL ADMINISTRATION $104.68
$472.85
POLICE & FIRE
PLANNING & INSPECTIONS $59.35
LIBRARY & RECREATION $65.87
$48.93
CITY ADMINISTRATION
$0.00 $100.00 $200.00 $300.00 $400.00 $500.00
Total per capita based on population estimate of 37,540 = $1,139.93
95
Page 101
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GOVERNMENTAL CAPITAL PROJECTS FUND SUMMARY
2016/17 $ DIFFERENCE % CHG
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET FY17 VS
1 BEGINNING BALANCE - PROJECTS 2,926,738 383,900 1,472,100 412,900 412,900 - 29,000 7.6%
2 REVENUES
3 STATE GRANTS - Other 63,890 105,000 31,400 158,000 33,000 - (72,000) -68.6%
4 INCOME FROM SALE OF ASSETS 180,401 - 70,100 - - - - 0.0%
5 MISCELLANEOUS RECEIPTS 77,663 - 16,700 - - - - 0.0%
6 INTEREST EARNINGS 5,427 5,000 13,600 8,300 8,300 - 3,300 66.0%
7 TRANSFER FROM GENERAL FUND 2,625,400 1,859,400 2,304,400 8,255,300 1,407,100 - (452,300) -24.3%
8 TRANSFER FROM COM TRANSP FUND - - - - - - - 0.0%
9 TRANSFER FROM MUNICIPAL STREET AID - CAP - - - - - - - 0.0%
8 TRANSFER FROM PARKLAND RESERVE - 80,000 - 50,000 205,000 - 125,000 156.3%
9 TRANSFER FROM CAPITAL ASSET RESERVE - - - 418,300 - 418,300 0.0%
9 TRANSFER FROM CABLE FRANCHISE RESV - - 155,400 - - - - 0.0%
10 SUBTOTAL CAPITAL PROJECT FUNDING SOURCES 2,952,781 2,049,400 2,591,600 8,471,600 2,071,700 - 22,300 1.1%
11 TOTAL FUNDING SOURCES 2,952,781 2,049,400 2,591,600 8,471,600 2,071,700 - 22,300 1.1%
12 TOTAL BEGINNING BALANCE & FUNDING SOURCE 5,879,519 2,433,300 4,063,700 8,884,500 2,484,600 - 51,300 2.1%
13 EXPENDITURES
14 CITY CLERK - - 155,400 - - - - 0.0%
15 TAX ASSESSOR - - - 18,200 - - - 0.0%
16 FIRE 445,594 145,700 145,700 184,100 184,100 - 38,400 26.4%
17 GROUNDS 68,352 58,200 153,800 62,500 62,500 - 4,300 7.4%
18 LIBRARY - - 15,000 - - - - 0.0%
19 RECREATION 70,514 165,000 - 241,000 271,000 - 106,000 64.2%
20 LIFE SAFETY 56,411 29,500 29,500 - - - (29,500) -100.0%
21 CODE ENFORCEMENT - - - 23,800 - - - 0.0%
22 PLANNING - - - 16,000 - - - 0.0%
23 INSPECTIONS - - - 16,000 - - - 0.0%
24 POLICE 268,501 299,800 299,800 2,218,400 379,900 - 80,100 26.7%
25 STREETS 2,918,713 1,026,000 1,988,600 5,110,500 1,070,000 - 44,000 4.3%
26 SANITATION 402,484 261,500 261,500 435,100 - - (261,500) -100.0%
27 CITY MANAGER - - 502,800 - - - - 0.0%
28 INFORMATION TECHNOLOGY - - - 50,600 36,600 - 36,600 0.0%
29 FACILITIES MANAGEMENT - 27,700 27,700 25,100 25,100 - (2,600) -9.4%
30 FLEET MAINTENANCE 84,234 31,000 31,000 27,000 - - (31,000) -100.0%
31 DEPARTMENT SUBTOTAL 4,314,803 2,044,400 3,610,800 8,428,300 2,029,200 - (15,200) -0.7%
32 TRANSFERS & MISCELLANEOUS EXPENSES
33 TRANSFER TO PARKLAND RESERVE - - 40,000 - - - - 0.0%
34 TRANSFER TO CAPITAL ASSET RESERVE 92,700 - - - - - - 0.0%
35 TRANSFERS & MISCELLANEOUS SUBTOTAL 92,700 - 40,000 - - - - 0.0%
36 TOTAL EXPENDITURES 4,407,503 2,044,400 3,650,800 8,428,300 2,029,200 - (15,200) -0.7%
37 BUDGET BALANCE 1,472,016 388,900 412,900 456,200 455,400 - 66,500 17.1%
38 TOTAL BUDGET BALANCE & EXPENDITURES 5,879,519 2,433,300 4,063,700 8,884,500 2,484,600 - 51,300 2.1%
$ DIFFERENCE
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS
39 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET POLICY
40 CAPITAL ASSET RESERVE 1,253,780 1,266,300 1,525,700 1,544,200 1,125,900 - (140,400) Min $500K
41 PARKLAND/RECREATION 326,364 247,900 376,300 366,200 176,200 - (71,700) N/A
96
Page 102
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER/WASTEWATER FUND SUMMARY
2016/17 $ DIFFERENCE % CHG
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET FY17 VS
1 BEGINNING BALANCE - WATER 1,072,915 566,500 881,300 1,330,900 1,330,900 - 764,400 134.9%
2 BEGINNING BALANCE - WASTEWATER 206,894 663,200 719,200 1,166,800 1,166,800 - 503,600 75.9%
3 TOTAL BEGINNING BALANCES 1,279,809 1,229,700 1,600,500 2,497,700 2,497,700 - 1,268,000 103.1%
4 BASE REVENUE:
5 WATER SERVICES 5,457,061 5,800,000 5,716,600 5,914,600 5,914,600 - 114,600 2.0%
6 WASTEWATER SERVICES 3,745,497 3,800,000 3,724,000 3,768,000 3,768,000 - (32,000) -0.8%
7 WASTEWATER TREATMENT SERVICES 2,936,831 3,000,000 2,940,000 2,952,900 2,952,900 - (47,100) -1.6%
8 GROUNDWATER INFLOW ADJUSTMENT 1,878,057 1,938,000 1,879,900 1,899,700 1,899,700 - (38,300) -2.0%
9 WATER TANK SPACE LEASING 337,989 366,200 366,200 391,400 391,400 - 25,200 6.9%
10 WATER IMPACT FEES 238,030 252,000 584,000 231,000 231,000 - (21,000) -8.3%
11 WASTEWATER IMPACT FEES 207,516 228,000 519,600 209,000 209,000 - (19,000) -8.3%
12 INTEREST - WATER 2,171 10,000 5,700 5,700 5,700 - (4,300) -43.0%
13 INTEREST - WASTEWATER 2,170 10,000 5,700 5,700 5,700 - (4,300) -43.0%
14 MISCELLANEOUS SERVICE FEE 69,555 63,000 74,400 61,000 61,000 - (2,000) -3.2%
15 TOTAL REVENUES 14,874,877 15,467,200 15,816,100 15,439,000 15,439,000 - (28,200) -0.2%
16 TOTAL BEGINNING BALANCE & REVENUES 16,154,686 16,696,900 17,416,600 17,936,700 17,936,700 - 1,239,800 7.4%
17 DIRECT EXPENSES:
18 ENGINEERING & INSPECTION 499,239 516,500 521,900 521,200 514,000 - (2,500) -0.5%
19 WATER DEPARTMENT 618,876 655,400 677,400 654,400 633,400 - (22,000) -3.4%
20 WASTEWATER DEPARTMENT 774,075 962,400 983,500 981,400 962,800 - 400 0.0%
21 WATER TREATMENT PLANT 1,647,253 1,727,400 1,736,800 1,823,800 1,778,800 - 51,400 3.0%
22 DIRECT EXPENDITURE SUBTOTAL 3,539,443 3,861,700 3,919,600 3,980,800 3,889,000 - 27,300 0.7%
23 OTHER EXPENSES:
24 DEBT SERVICE - WATER 516,941 590,300 590,300 524,600 524,600 - (65,700) -11.1%
25 DEBT SERVICE - WASTEWATER 608,966 636,900 636,900 612,800 612,800 - (24,100) -3.8%
26 RETIREES HEALTH CARE 60,200 192,400 192,400 242,200 242,200 - 49,800 25.9%
27 OTHER EMPLOYMENT EXPENSES - 21,200 3,300 37,000 33,700 - 12,500 59.0%
28 OPEB UNFUNDED LIABILITY - - 101,800 - - - - 0.0%
29 KENT COUNTY TREATMENT CHARGE 3,894,341 4,130,000 4,130,000 3,926,500 3,926,500 - (203,500) -4.9%
30 INTERFUND SERVICE FEES 1,426,018 1,653,800 1,673,400 1,706,000 1,699,800 - 46,000 2.8%
31 BANK & CREDIT CARD FEES 23,559 25,000 25,000 26,000 26,000 - 1,000 4.0%
32 BOND ISSUANCE COSTS - 40,000 40,000 40,000 40,000 - - 0.0%
33 OTHER EXPENSES SUBTOTAL 6,530,025 7,289,600 7,393,100 7,115,100 7,105,600 - (184,000) -2.5%
34 TRANSFER TO:
35 GENERAL FUND FROM WATER 550,000 500,000 500,000 500,000 500,000 - - 0.0%
36 GENERAL FUND FROM WASTEWATER 300,000 375,000 375,000 400,000 400,000 - 25,000 6.7%
37 WATER IMP AND EXT 1,800,000 1,000,000 980,000 3,283,800 1,600,000 - 600,000 60.0%
38 WASTEWATER IMP AND EXT 1,500,000 1,000,000 980,000 2,038,500 1,600,000 - 600,000 60.0%
39 CONTINGENCY RESERVE WATER 32,000 110,000 131,100 - - - (110,000) -100.0%
40 CONTINGENCY RESERVE WASTEWATER - 60,000 60,000 - - - (60,000) -100.0%
41 ELECTRIC IMP AND EXT - 231,200 231,200 263,000 - - (231,200) -100.0%
42 GENERAL EMPLOYEES PENSION 248,400 - - - 7,500 - 7,500 0.0%
43 TRANSFER TO SUBTOTAL 4,484,789 3,276,200 3,257,300 6,485,300 4,107,500 - 831,300 25.4%
44 TOTAL EXPENSES 14,554,257 14,427,500 14,570,000 17,581,200 15,102,100 - 674,600 4.7%
45 BUDGET BALANCES
46 BUDGET BALANCE WATER 881,297 1,103,100 1,330,900 (431,700) 1,585,700 - 482,600 43.7%
47 BUDGET BALANCE WASTEWATER 719,132 1,166,300 1,166,800 787,200 1,248,900 - 82,600 7.1%
48 BUDGET BALANCE SUBTOTALS 1,600,429 2,269,400 2,497,700 355,500 2,834,600 - 565,200 24.9%
49 TOTAL BUDGET BALANCES & EXPENSES 16,154,686 16,696,900 17,067,700 17,936,700 17,936,700 - 1,239,800 7.4%
50 EXCEEDS/(REMAINS)TO MEET REQMNT 1,600,429 1,032,000 1,232,400 (879,700) 1,599,400 (1,235,200)
2016/17 $ DIFFERENCE
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS
51 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED BUDGET FY17 BUDGET POLICY
52 CONTINGENCY - WATER 117,894 249,000 251,600 255,100 255,100 - 6,100 $250K
53 CONTINGENCY - WATER/WASTEWATER 214,629 253,100 276,200 282,300 282,300 - 29,200 $250K
97
Page 103
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2017/2018
Water/Wastewater Fund
Revenue
WATER TANK SPACE
LEASING
GROUNDWATER 2.5%
INFLOW
IMPACT FEES
ADJUSTMENT
2.8% MISCELLANEOUS
12.3%
SERVICE FEE
0.5%
WASTEWATER
TREATMENT
WATER SERVICES
SERVICES
38.3%
19.1%
WASTEWATER
SERVICES
24.4%
98
Page 104
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
2017/2018 Budget
Water/Wastewater Fund Expenses
By Major Function
INTRAFUND
SERVICE FEES TRANSFER TO
11.5% GENERAL FUND
6.0%
TRANSFER TO
CAPITAL PROJECTS
21.3%
TRF TO
CONTINGENCY
WATER
0.0%
ENGINEERING &
KENT COUNTY
INSPECTION
TREATMENT FEES
3.4%
26.1%
WATER
CONSTRUCTION
0.0%
WATER
DEBT SERVICE DEPARTMENT
WATER TREATMENT 4.2%
7.6%
PLANT
RETIREE MEDICAL
12.0%
CONTRIBUTIONS
1.6%
WASTEWATER
DEPARTMENT
6.4%
99
Page 105
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
2017/2018 Budget
Water/Wastewater Fund Expenses
By Expense Category
INTRAFUND
SERVICE FEES
TRANSFER TO
11.2%
GENERAL FUND
5.9%
TRANSFER TO
CAPITAL PROJECTS
21.0%
KENT COUNTY
TREATMENT FEES
25.8%
PERSONNEL
SERVICES
17.6%
MATERIALS &
RETIREE MEDICAL SUPPLIES
CONTRIBUTIONS DEBT SERVICE
2.3%
1.6% 7.5%
ADMINISTRATIVE
EXPENSES
7.3%
100
Page 106
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER/WASTEWATER IMPROVEMENT & EXTENSION FUND SUMMARY
2016/17 $ DIFFERENCE % CHG
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET FY17 VS
1 BEGINNING BALANCE - WATER 4,990,310 1,179,900 3,584,500 2,042,000 2,042,000 - 862,100 73.1%
2 BEGINNING BALANCE - WASTEWATER 4,551,722 952,600 3,129,800 1,195,100 1,195,100 - 242,500 25.5%
3 TOTAL BEGINNING BALANCES 9,542,032 2,132,500 6,714,300 3,237,100 3,237,100 - 1,104,600 51.8%
4 REVENUES
5 STATE LOAN FUND - WATER - 2,400,000 2,400,000 - - - (2,400,000) -100.0%
6 STATE LOAN FUND - WASTEWATER - 884,000 884,000 250,000 - - (884,000) -100.0%
7 TRANS FR OPERATING FUND - WATER 1,800,000 1,000,000 980,000 3,283,800 1,600,000 - 600,000 60.0%
8 TRANS FR OPERATING FUND - WW 1,500,000 1,000,000 980,000 2,038,500 1,600,000 - 600,000 60.0%
9 TRANSFER FR WATER IMPACT FEE 20,800 190,800 190,800 - - - (190,800) -100.0%
10 TRANSFER FR WASTEWATER IMPACT FEE - 211,200 211,200 180,000 - - (211,200) -100.0%
11 FEDERAL/STATE GRANTS 18,952 - - - - - - 0.0%
12 PROCEEDS FROM SALE OF ASSETS 16,479 - - - - - - 0.0%
13 INTEREST INCOME 119,442 20,000 92,000 93,200 93,200 - 73,200 366.0%
14 MISCELLANEOUS RECEIPTS 70,247 - - - - - - 0.0%
15 TOTAL REVENUES 3,545,920 5,706,000 5,738,000 5,845,500 3,293,200 - (2,412,800) -42.3%
16 TOTAL BEGINNING BALANCES & REVENUES 13,087,952 7,838,500 12,452,300 9,082,600 6,530,300 - (1,308,200) -16.7%
17 EXPENSES
18 W/WW ENGINEERING - 30,400 30,400 - - - (30,400) -100.0%
19 WATER 1,810,487 1,338,800 3,908,100 1,685,700 1,608,400 - 269,600 20.1%
20 WASTEWATER 3,045,887 2,021,200 4,004,700 2,468,500 1,543,000 - (478,200) -23.7%
21 WATER TREATMENT PLANT 246,052 1,200,000 1,200,000 1,598,100 - - (1,200,000) -100.0%
22 TRANSFER TO IMPACT FEE RESV - WW 1,271,343 - - - - - - 0.0%
23 TOTAL EXPENSES 6,373,769 4,590,400 9,143,200 5,752,300 3,151,400 - (1,439,000) -31.3%
24 BUDGET BALANCE - WATER 3,584,464 2,226,700 2,042,000 2,088,600 2,080,200 - (146,500) -6.6%
25 BUDGET BALANCE - WASTEWATER 3,129,719 1,021,400 1,195,100 1,241,700 1,298,700 - 277,300 27.1%
26 TOTAL ENDING BUDGET BALANCES 6,714,183 3,248,100 3,237,100 3,330,300 3,378,900 - 130,800 4.0%
27 TOTAL BUDGET BALANCES & EXPENSES 13,087,952 7,838,500 12,380,300 9,082,600 6,530,300 - (1,308,200) -16.7%
2016/17 $ DIFFERENCE
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS
28 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET POLICY
29 CAPITAL ASSET RESERVE-WATER 519,543 518,500 527,200 534,900 534,900 - 16,400 MIN $500K
30 CAPITAL ASSET RESERVE-WASTEWATER 518,354 517,300 526,000 533,600 533,600 - 16,300 MIN $500K
31 IMPACT FEE RESERVE - WATER 434,156 243,200 249,800 254,000 254,000 - 10,800 20% of Rev.
32 IMPACT FEE RESERVE - WASTEWATER 3,075,416 1,391,800 2,909,500 2,951,600 2,951,600 - 1,559,800 20% of Rev.
101
Page 107
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC REVENUE FUND SUMMARY
2016/17 $ DIFFERENCE % CHG
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET FY17 VS
1 BEGINNING BALANCE 8,337,466 13,302,200 19,896,400 20,290,200 20,290,200 - 6,988,000 52.5%
2 DISTRIBUTION OF EARNINGS - PCA CREDIT - (1,798,000) (1,851,300) (6,176,700) (6,176,700) - (4,378,700) 243.5%
3 BEGINNING BALANCE - ADJUSTED 8,337,466 11,504,200 18,045,100 14,113,500 14,113,500 - 2,609,300 22.7%
4 BASE REVENUE:
5 DIRECT SALES TO CUSTOMER 77,844,937 78,991,200 81,373,900 78,851,100 79,656,000 - 664,800 0.8%
6 UTILITY TAX 1,309,701 1,287,900 1,306,200 1,222,700 1,236,200 - (51,700) -4.0%
7 MISCELLANEOUS REVENUE 842,163 548,600 479,100 596,600 531,200 - (17,400) -3.2%
8 RENT REVENUE 238,862 223,000 104,500 104,500 104,500 - (118,500) -53.1%
9 GREEN ENERGY 126,593 128,000 130,000 130,000 130,000 - 2,000 1.6%
10 INTEREST EARNINGS 64,340 47,900 205,800 216,300 216,300 - 168,400 351.6%
11 TRANSFER FROM RATE STABILIZATION 750,000 - - - - - - 0.0%
12 TOTAL REVENUES 81,176,596 81,226,600 83,599,500 81,121,200 81,874,200 - 647,600 0.8%
13 TOTAL BEGINNING BALANCE & REVENUES 89,514,062 92,730,800 101,644,600 95,234,700 95,987,700 - 3,256,900 3.5%
14 EXPENSES:
15 POWER SUPPLY 23,610,686 16,557,600 19,489,500 22,807,900 22,807,900 - 6,250,300 37.7%
16 SOLAR ENERGY 2,280,044 2,313,900 2,454,200 2,661,300 2,661,300 - 347,400 15.0%
17 SOLAR RENEWAL ENERGY CREDITS 344,577 363,400 359,500 371,200 371,200 - 7,800 2.1%
18 POWER SUPPLY MANAGEMENT 996,000 996,000 835,000 835,000 835,000 - (161,000) -16.2%
19 REC'S (Renewable Energy Credits) 586,169 673,400 673,200 578,300 578,300 - (95,100) -14.1%
20 RGGI 66,080 129,300 41,400 64,000 64,000 - (65,300) -50.5%
21 PJM CHARGES - ENERGY 2,960,596 12,357,900 6,783,900 6,024,400 6,024,400 - (6,333,500) -51.3%
22 PJM CHARGES - TRANSMISSION & FEES 5,247,660 7,603,800 6,036,700 6,900,200 6,900,200 - (703,600) -9.3%
23 CAPACITY CHARGES 10,574,198 10,160,600 10,428,800 10,482,500 10,482,500 - 321,900 3.2%
24 SUB-TOTAL POWER SUPPLY 46,666,010 51,155,900 47,102,200 50,724,800 50,724,800 - (431,100) -0.8%
25 PLANT OPERATIONS 5,734,855 6,215,700 6,280,700 6,486,700 6,146,500 - (69,200) -1.1%
26 GENERATIONS FUELS 1,339,688 302,600 1,256,300 1,614,600 817,400 - 514,800 170.1%
27 PJM SPOT MARKET ENERGY (1,002,972) (804,900) (1,391,800) (1,606,000) (958,100) - (153,200) 19.0%
28 PJM CREDITS (617,904) (360,000) (584,500) (535,400) (535,400) - (175,400) 48.7%
29 CAPACITY CREDITS (9,827,426) (7,355,100) (7,364,400) (7,120,100) (7,120,100) - 235,000 -3.2%
30 GENERATION SUBTOTAL (4,373,759) (2,001,700) (1,803,700) (1,160,200) (1,649,700) - 352,000 -17.6%
31 POWER SUPPLY & GENERATION SUBTOTAL 42,292,251 49,154,200 45,298,500 49,564,600 49,075,100 - (79,100) -0.2%
32 DIRECT EXPENDITURES
33 TRANSMISSION/DISTRIBUTION 3,279,685 3,605,700 3,616,800 3,649,800 3,599,600 - (6,100) -0.2%
34 ELECTRICAL ENGINEERING 1,065,980 1,247,900 1,250,900 1,303,100 1,223,100 - (24,800) -2.0%
35 ADMINISTRATION 711,397 929,700 933,700 930,800 794,800 - (134,900) -14.5%
36 METER READING 358,571 378,600 379,600 449,500 391,000 - 12,400 3.3%
37 SYSTEMS OPERATIONS 593,428 651,700 662,100 644,700 644,700 - (7,000) -1.1%
38 DIRECT EXPENDITURE SUBTOTALS 6,009,061 6,813,600 6,843,100 6,977,900 6,653,200 - (160,400) -2.4%
39 OTHER EXPENSES:
40 UTILITY TAX 1,309,701 1,287,900 1,306,200 1,222,700 1,236,200 - (51,700) -4.0%
41 ALLOW FOR UNCOLLECTIBLES 200,000 250,000 250,000 250,000 250,000 - - 0.0%
42 CONTRACTUAL SERVICES - RFP'S - - - - 100,000 - 100,000 0.0%
43 LEGAL EXPENSES - - - - 25,000 25,000
44 RETIREES HEALTH CARE 57,700 600,000 600,000 820,300 820,300 - 220,300 36.7%
45 OTHER EMPLOYMENT EXPENSES - 58,900 29,400 49,800 110,700 - 51,800 87.9%
46 PENSION UNFUNDED LIABILITY - - - - 1,000,000 - 1,000,000 0.0%
47 OPEB UNFUNDED LIABILITY - - 109,300 - 1,000,000 - 1,000,000 0.0%
48 GREEN ENERGY PAYMENT TO DEMEC 126,593 128,000 128,000 130,000 130,000 - 2,000 1.6%
49 INTERFUND SERVICE FEES 3,640,969 3,564,900 3,625,900 3,640,900 3,625,000 - 60,100 1.7%
50 INTEREST ON DEPOSITS 18,283 21,000 21,000 21,000 21,000 - - 0.0%
51 BANK & CREDIT CARD FEES 258,500 275,000 275,000 295,000 295,000 - 20,000 7.3%
52 DEBT SERVICE 1,621,463 1,618,000 1,618,000 1,605,500 1,605,500 - (12,500) -0.8%
53 OTHER EXPENSES SUBTOTAL 7,233,209 7,803,700 7,962,800 8,035,200 10,218,700 - 2,415,000 30.9%
54 TRANSFER TO:
55 IMPROVEMENT & EXTENSION 3,665,375 2,500,000 2,500,000 4,500,000 5,000,000 - 2,500,000 100.0%
56 GENERAL FUND 10,000,000 10,000,000 10,000,000 10,000,000 10,000,000 - - 0.0%
57 TRANSFER TO FUTURE CAPACITY RESERVE - 750,000 2,750,000 - - - (750,000) -100.0%
58 TRANSFER TO DEPRECIATION RESERVE - 750,000 2,750,000 - - - (750,000) -100.0%
59 TRANSFER INSURANCE RESERVE 10,000 - - - - - - 0.0%
60 TRANSFER CONTINGENCY RESERVE 13,000 - - - - - - 0.0%
61 RATE STABILIZATION RESERVE 394,800 1,250,000 3,250,000 6,500,000 5,200,000 - 3,950,000 316.0%
62 TRANSFER TO SUBTOTAL 14,083,175 15,250,000 21,250,000 21,000,000 20,200,000 - 4,950,000 32.5%
63 TOTAL EXPENSES 69,617,696 79,021,500 81,354,400 85,577,700 86,147,000 - 7,125,500 9.0%
64 BUDGET BALANCE - WORKING CAPITAL 19,896,366 13,709,300 20,290,200 9,657,000 9,840,700 - (3,868,600) -28.2%
65 TOTAL BUDGET BALANCE & EXPENSES 89,514,062 92,730,800 101,644,600 95,234,700 95,987,700 - 3,256,900 3.5%
66 EXCEEDS/(REMAINS)TO MEET REQUIREMENT 10,402,366 4,116,700 10,415,000 69,200 164,100 -
2016/17 $ DIFFERENCE
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS
67 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET POLICY
68 CONTINGENCY RESERVE 849,980 848,300 863,500 877,300 877,300 - 29,000 $750K
69 INSURANCE RESERVE 763,515 762,000 775,800 788,200 788,200 - 26,200 $750K
70 RATE STABILIZATION RESERVE 7,269,177 8,511,900 10,635,500 16,005,700 16,005,700 - 7,493,800 10% - 20%
102
Page 108
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Electric Fund
Fiscal Year 2017/2018
Revenue
DIRECT SALES TO
CUSTOMER
97.3%
TRANSFER FROM
RATE STABILIZATION
0.0%
UTILITY TAX
1.5%
MISCELLANEOUS
REVENUE
1.2%
103
Page 109
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Electric Fund
Fiscal Year 2017/2018
Expense by Function
ADMINISTRATION METER READING
1.0% 0.5%
ENGINEERING SYSTEMS
1.5% OPERATIONS
T&D 0.8%
4.5%
TRANSFER TO
GENERAL FUND
12.5%
TRANSFER TO
CAPITAL PROJECTS
6.3%
INTERFUND
SERVICE FEES
4.5%
DEBT SERVICE
2.0%
POWER SUPPLY &
GENERATION
61.5% RETIREE MEDICAL
CONTRIBUTIONS
2.3%
MISCELLANEOUS
EXPENSES
1.0%
STATE UTILITY
TAXES
1.5%
104
Page 110
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Electric Fund
Fiscal Year 2017/2018
Expense by Category
POWER SUPPLY &
GENERATION
60.9%
TRANSFER TO
GENERAL FUND
12.4%
ADMINISTRATIVE
EXPENSES
1.4%
TRANSFER TO
MATERIALS & CAPITAL PROJECTS
SUPPLIES 6.2%
0.8%
PERSONNEL DEBT SERVICE
SERVICES 2.0% INTERFUND
7.0% SERVICE FEES
4.5%
RETIREE MEDICAL
CONTRIBUTIONS
2.3%
MISCELLANEOUS STATE UTILITY
EXPENSES TAXES
1.0% 1.5%
105
Page 111
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC IMPROVEMENT & EXTENSION FUND SUMMARY
2016/17 $ DIFFERENCE % CHG
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET FY17 VS
1 BEGINNING BALANCE 7,095,270 5,540,500 9,314,400 6,600,300 6,600,300 - 1,059,800 19.1%
2 REVENUES
3 TRANSFER FROM ELECTRIC 3,665,375 2,500,000 2,500,000 4,500,000 5,000,000 - 2,500,000 100.0%
4 TRANSFER FROM WATER/WASTEWATER - 231,200 231,200 263,000 - - (231,200) -100.0%
5 TRANSFER FROM GENERAL FUND - - - 322,300 - - - 0.0%
6 BOND ISSUE PROCEEDS 1,942,628 - - - - - - 0.0%
7 GENERAL SERVICE BILLING 327,453 900,000 900,000 900,000 370,000 - (530,000) -58.9%
8 DEVELOPMENT GRANTS - 5,000 5,000 - - - (5,000) -100.0%
9 INCOME FROM SALE OF ASSETS 6,200 - 28,000 - - - - 0.0%
10 INTEREST EARNINGS 92,608 40,000 105,300 109,800 109,800 - 69,800 174.5%
11 TOTAL REVENUES 6,034,264 3,676,200 3,769,500 6,095,100 5,479,800 - 1,803,600 49.1%
12 TOTALS 13,129,534 9,216,700 13,083,900 12,695,400 12,080,100 - 2,863,400 31.1%
13 EXPENSES
14 ELECTRIC ADMINISTRATION - - 23,000 1,183,700 8,500 - 8,500 0.0%
15 ELECTRIC GENERATION 964,880 1,842,800 2,389,100 2,990,000 2,328,000 - 485,200 26.3%
16 TRANSMISSION AND DISTRIBUTION 1,109,450 1,975,000 2,175,000 2,428,000 1,725,500 - (249,500) -12.6%
17 ELECTRICAL ENGINEERING 1,740,853 910,700 1,731,700 3,680,700 1,315,000 - 404,300 44.4%
18 METER READING - 41,800 64,800 - - - (41,800) -100.0%
19 ERP SYSTEM - 1,000,000 100,000 1,360,000 1,500,000 - 500,000 50.0%
20 TOTAL EXPENSES 3,815,183 5,770,300 6,483,600 11,642,400 6,877,000 - 1,106,700 19.2%
21 BUDGET BALANCE 9,314,351 3,446,400 6,600,300 1,053,000 5,203,100 - 1,756,700 51.0%
22 TOTAL BUDGET BALANCE & EXPENSES 13,129,534 9,216,700 13,083,900 12,695,400 12,080,100 - 2,863,400 31.1%
2016/17 $ DIFFERENCE
2015/16 ORIGINAL 2016/17 2017/18 2017/18 2017/18 FY18 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY17 BUDGET POLICY
23 RESERVE BALANCES
24 DEPRECIATION RESERVE 10,130,667 10,910,200 13,042,800 13,251,500 13,251,500 - 2,341,300 Min $10M
25 FUTURE CAPACITY RESERVE 10,283,292 10,961,700 13,197,700 13,408,900 13,408,900 - 2,447,200 Min $10M
106
Page 113
FY 2018 DRAFT ANNUAL OPERATING BUDGET – DOVER, DELAWARE
Sec. 44. - Annual budget.
On or before the second Monday of May of each year, the city manager shall prepare and submit to
the council, a budget, presenting a financial plan for conducting the affairs of the city for the ensuing fiscal
year. The total of proposed expenditures shall not exceed the total of anticipated income.
The budget shall include the following information:
1. A detailed statement showing the expenses of conducting each department and office of the
city for the current year and last preceding fiscal year.
2. A detailed estimate of the expenses of conducting each department and office of the city for the
ensuing fiscal year with reasons for the increases and decreases recommended.
3. The amount of the debt of the city together with a schedule of maturities of bond issues.
4. A statement showing the amount required for interest on the city debt and for paying off any
bonds maturing during the year and the amount required for the sinking fund.
5. An itemized statement of all anticipated income of the city with a comparative statement of the
amounts received by the city from each of the same or similar sources for the last preceding and
current fiscal years.
6. An estimate of the amount of money to be received from taxes.
7. Such other information as the city manager may think desirable or as may be required by the
council.
The council shall on or before the second Monday in the month of June in each year adopt a budget
for the succeeding fiscal year. The council shall, so far as possible, adhere to the budget so adopted in the
making of appropriations.
(Amd. of 7-12-2005 (S.B. 126))
108
Page 114
CITY OF DOVER
FINANCIAL POLICIES
Amended October 12, 2015
109
Page 115
CITY OF DOVER, DELAWARE
FINANCIAL POLICIES
The purpose of these policies is to present a standardized set of principles that the City follows in
managing its financial and budgetary affairs. These are general statements of policies, which
represent long-standing principles, traditions, and practices that will be used to guide the City in
maintaining financial stability. It will be the responsibility of the Finance Department to ensure the
financial objectives of these policies are maintained.
Revenue Policy
1. The City will strive to maintain a broad and diversified revenue base that will equitably
distribute the burden of supporting City services and will protect the City from short-term
fluctuations in any one revenue source.
2. The City will actively support economic and industrial development recruitment and
retention efforts to provide for a solid revenue base.
3. The City will maintain timely collection systems and implement necessary enforcement
strategies to collect revenues from available sources.
4. The City will establish user fees and charges for services, when feasible, at levels related to
the cost of providing the services. The City will review the fees and charges every three to
five years to determine modifications needed to keep pace with the cost of providing the
services. Property Tax Rates are set annually
5. The City will establish, when feasible, self-supporting enterprise funds and intergovernmental
service funds in which a relationship between revenues and expenditures clearly exists.
6. The City will project current revenues on a conservative basis so the actual revenues will
consistently meet or exceed budgeted revenues. Revenues greater or less than the original
budget will flow through to the audited Ending Budget Balance.
7. The City will maintain a budgetary control system and will prepare reports, which compare
actual revenues to budgeted amounts.
8. The City will limit the designation of General Fund revenues for specified purposes to
maximize flexibility in budgeting and revenue utilization.
9. The City will review annually and revise, where necessary, its cost allocation formulas, i.e.
internal service departments.
10. Upon satisfying all rate covenants the City will provide operating transfers to the General
Fund. From the Water/Wastewater Utility no greater than $1,000,000 and from the Electric
Utility no greater than $10,000,000.
110
Page 116
Expenditure Policy
1. Basic and essential services provided by the City will receive first priority for funding, i.e.
Public Safety & Health, Utilities, Streets, & Sanitation.
2. A report of the expenses of the Public Safety categories that have been identified will be
presented to City Council two (2) times; once upon delivery of the proposed budget in May
and the other upon the adoption of the budget in July. The report will map the revenues that
have been identified to support the expenses, how much of a gap there is, and what the trend is
for closing the gap over a 20 year period. The revenues will be the direct revenues of those
programs and the Property Tax Revenue, excluding BID taxes.
3. The City will adopt a balanced budget, by fund, for all funds maintained by the City, in which
total anticipated revenues must equal or exceed the budgeted expenditures for each fund. The
Beginning Budget Balance will not be considered a revenue source.
4. The City will maintain a budgetary control system to ensure adherence to the original adopted
budget and will prepare reports, which compare actual expenditures to budgeted amounts.
Expenditures greater or less than the original adopted budget will flow through the audited
Ending Budget Balance.
5. The City will restrict the use of appropriations as follows:
• Funds appropriated for personnel expenses shall be restricted to use as personnel
expenses; Any personnel savings at the end of each fiscal year will be re-appropriated in
the next fiscal year to be transferred to the City’s unfunded retirement liabilities;
• Funds appropriated as capital expenses shall be restricted to use as capital expenses;
• Funds appropriated as operating expenses shall be restricted to use as operating
expenses;
• All requests for additional personnel shall be accompanied with a five-year estimate on
the costs of such position(s), including salaries and other employment costs (OEC’s);
6. The City will refrain from budgeting revenues derived from infrequent and unanticipated
transactions for ongoing expenses. These revenues will be set aside for asset replacement or
as otherwise directed by Council.
7. The City will provide access to medical, dental, vision, life, AD & D, and short-term disability
insurance for its employees. The cost for these benefits will be a shared responsibility
between the City and its employees as outlined in the City Personnel Handbook or collective
bargaining agreements
8. The City will provide access to medical and dental insurance for its retirees and their families.
The cost for these benefits will be a shared responsibility between the City and its retirees as
outlined in the City Personnel Handbook or collective bargaining agreements.
9. The City will provide access to appropriate retirement plans for its employees. The City will
make contributions for eligible employees at the actuarial determined percentage defined for
each of the respective retirement plans.
111
Page 117
10. The City will establish an Other Post-Employment Benefit Fund (OPEB). The City will make
contributions for eligible employees and retirees at the actuarial determined rates or
percentages to fund future retiree medical benefits.
Debt Policy
1. The City will maintain a debt management policy and full disclosure on financial reports.
2. The City will maintain communications with bond rating agencies and continue to strive for
improvements in the City’s bond rating.
3. The City will adhere to its debt covenants.
4. The City will review its debt capacity every three (3) years.
5. The City will pay for all capital projects and capital improvements on a pay-as-you-go basis
using current revenues if possible. If a project or improvement cannot be financed with current
revenues, long-term debt or use of reserves will be recommended.
6. The City will refrain from issuing long-term debt for a period in excess of the expected useful
life of the capital project.
7. The City will use special assessment revenue or other self-supporting bonds instead of general
obligation bonds, when practical.
8. The City will seek refinancing of outstanding debt if it is determined that the City will benefit
by reduced interest expense over the remaining life of the bonds.
Budget Balance/Reserve Policy – General Fund
1. The City will strive to maintain a minimum Budget Balance, of at least 8% and no greater than
12% of the current year operating revenues for the General Fund, excluding the carry forward
balance. The purpose of the budget balance is to meet temporary fluctuations in cash flows and
to provide a cushion for loss of revenues until operating changes can be implemented. If the
final Budget Balance exceeds the amount as approved in the budget ordinance, such funds shall
be used to provide for unfunded retirement liabilities or as otherwise designated by City
Council. The City may use monies in the Budget Balance only in times of fiscal and economic
hardship.
2. Once achieved, at no time should the City’s budget balances fall below their specified
percentages. If a shortfall occurs in the budget balance and immediately restoring the balances
to the specified percentage would cause an extreme burden on the taxpayers, the budget balance
may, with the City Council’s approval, be restored to the specified percentage within one (1)
year, but in any case, no longer than three (3) years.
3. The City will maintain a minimum reserve, in a contingency account, of at least $700,000. The
City may only use monies in the contingency accounts to cover emergencies of a non-recurring
nature that are over and above the normal course of operations. Examples are uninsured losses,
112
Page 118
storms or hurricane damages. The Contingency Reserve will not be used to balance the
operating budget.
4. The total of the General Fund budget and contingency balances shall not exceed 17% (~ 2
months) of Budgeted Operating Revenues.
5. The City will create a Capital Asset Replacement account for Governmental Fund asset
procurements. Optimally, the amount set aside for future asset replacements should equal the
annual depreciation of the current assets. (Annual Depreciation is approximately $2.5 million
per year) The City will appropriate excess (amounts greater than budgeted) revenues to fund
this account, or if the balance is less than the $500,000 minimum, $200,000 per annum until
such time the minimum balance is replenished.
6. The City will create a General Capital Project Fund to account for all General Government asset
procurements and projects. The City will provide operating fund transfers and/or debt proceeds
for each fiscal year’s Capital Investment Plan. All vehicle and equipment purchases under
$25,000 will be budgeted on a pay as you go basis.
Budget Balance/Reserve Policy – Water/Wastewater Fund
1. The City will strive to maintain a minimum Budget Balance, of at least 8% and no greater than
17% (two months) of the current year operating revenues for each of the Water & Wastewater
Utility Funds, excluding the carry forward balance. The purpose of the budget balance is to
meet temporary fluctuations in cash flows and to provide a cushion for loss of revenues until
operating changes can be implemented. If the final Budget Balance exceeds the amount as
approved in the budget ordinance, such funds shall be used to provide for unfunded retirement
liabilities or as otherwise designated by City Council. The City may use monies in the Budget
Balance only in times of fiscal and economic hardship.
2. Once achieved, at no time should the City’s budget balances fall below their specified
percentages. If a shortfall occurs in the budget balance and immediately restoring the balances
to the specified percentage would cause an extreme burden on the ratepayers, the budget balance
may, with the City Council’s approval, be restored to the specified percentage within one (1)
year, but in any case, no longer than three (3) years.
3. The City will maintain a minimum reserve, in a contingency account, of at least $250,000 for
each the Water & Wastewater Fund. The City may only use monies in the contingency accounts
to cover emergencies of a non-recurring nature that are over and above the normal course of
operations. Examples are uninsured losses, storms or hurricane damages. The Contingency
Reserve will not be used to balance the operating budget.
4. The total of the combined Water & Wastewater Fund budget and contingency balances shall not
exceed 25% (3 months) of Budgeted Operating Revenues.
5. The City will maintain a Capital Asset Replacement account to cover replacement or
procurement of assets of the utility. Optimally, the amount set aside for future asset
replacements should equal the annual depreciation of the current assets. The City will maintain
a minimum balance of $500,000 for each utility for Capital Asset Replacements. The City will
113
Page 119
appropriate excess revenues to fund this account, or if the balance is less than the minimum
$100,000 per annum for each utility until such time the minimum balance is achieved.
6. The City established by ordinance on December 17, 1996 the Wastewater Impact Fee Reserve to
provide for future expansion of the City’s wastewater system due to increased demand. The
ordinance further provides for debt service payments attributed to wastewater expansion
projects to be funded by the current year’s collection of Impact Fees and the remainder to be
deposited into the reserve account. The City shall maintain a minimum of 20% of wastewater
revenues in the Impact Fee Reserve account. Amounts used to finance projects shall be
replenished by the operating revenues of the Wastewater Fund over the succeeding seven years
of any project completion.
7. The City established by ordinance on February 1, 2008 the Water Impact Fee Reserve to
provide for future expansion of the City’s water system due to increased demand. The
ordinance further provides for debt service payments attributed to water system expansion
projects to be funded by the current year’s collection of Impact Fees and the remainder to be
deposited into the reserve account. The City shall maintain a minimum of $1.5 million of water
revenues in the Impact Fee Reserve account. Amounts used to finance projects shall be
replenished by the operating revenues of the Water Fund over the succeeding seven (7) years of
any project completion.
8. The Water & Wastewater Improvement & Extension Fund budget balance shall be no less than
$200,000 of the current fiscal year’s appropriation for water and wastewater projects to allow
for project variances and change orders; a 10% contingency shall be included in project budgets
greater than $250,000 if the Department Head determines it to be appropriate. All vehicle and
equipment purchases under $25,000 will be budgeted on a pay as you go basis. The City
Manager shall make the necessary budget amendments in accordance with the City of Dover
Purchasing & Budget Amendment Policies.
Budget Balance/Reserve Policy – Electric Revenue Fund
1. The City will strive to maintain a minimum Budget Balance, of at least 12% (45 days) of the
current year operating revenues for the Electric Revenue Fund, excluding the carry forward
balance and power cost adjustments. The purpose of the budget balance is to meet temporary
fluctuations in cash flows and to provide a cushion for loss of revenues until operating changes
can be implemented. If the final Budget Balance exceeds the amount as approved in the budget
ordinance, such funds shall be used to provide for unfunded retirement liabilities or as otherwise
designated by City Council. The City may use monies in the Budget Balance only in times of
fiscal and economic hardship.
2. Once achieved, at no time should the City’s budget balances fall below their specified
percentages. If a shortfall occurs in the budget balance and immediately restoring the balances
to the specified percentage would cause an extreme burden on the ratepayers, the budget balance
may, with the City Council’s approval, be restored to the specified percentage within one year,
but in any case, no longer than three years.
3. The City will maintain a minimum reserve, in a contingency account, of at least $750,000 for
the Electric Revenue Fund. The City may only use monies in the contingency accounts to cover
emergencies of a non-recurring nature that are over and above the normal course of operations.
114
Page 120
Examples are uninsured losses, storms or hurricane damages. The Contingency Reserve will
not be used to balance the operating budget.
4. The total of the combined Electric Revenue Fund budget and contingency balances shall not
exceed 25% (3 months) of Budgeted Operating Revenues.
5. The City has established by bond covenant an account to cover insurance deductibles on the
electric transmission and distribution system or the generating plants. The City shall maintain a
minimum balance of $750,000 to cover various deductibles.
6. Recognizing price fluctuations in the wholesale power markets the City has established a rate
stabilization reserve. The purpose of using such a reserve is to level off the fluctuations in the
wholesale power supply market and in turn provide stable rates to our customers. In those
instances where the actual cost of power supply and generation are less/more than the budgeted
cost of power supply and generation, the City will transfer the difference to/from the Rate
Stabilization Reserve. The balance shall be maintained at a minimum of 10% not to exceed
20% of the purchase power cost in any given year. If the reserve balance exceeds the 20%
maximum, a credit will be applied to the power cost adjustment.
7. The Electric Improvement & Extension Fund budget balance shall be no less than $200,000 of
the current fiscal year’s appropriation for electric system projects to allow for project variances
and change orders; a 10% contingency shall be included in project budgets greater than
$250,000 if the Department Head determines it to be appropriate. All vehicle and equipment
purchases under $25,000 will be budgeted on a pay as you go basis. The City Manager shall
make the necessary budget amendments in accordance with the City of Dover Purchasing &
Budget Amendment Policies.
8. The City has established an account to provide for capital financing of Future Capacity or
system expansion. The City shall maintain a balance equivalent to the value of 10% growth in
capacity at any given time, or no less than $10,000,000. Amounts used to finance projects shall
be replenished by the operating revenues of the Electric Revenue Fund over the succeeding
seven years of any project completion.
9. The City has established an account to provide for replacement or procurement of utility system
assets, otherwise known as Depreciation Reserve. Optimally, the amount set aside for future
asset replacements should equal the annual depreciation of the current assets. The City will
maintain a minimum balance of $10,000,000. The primary purpose of this account is to provide
partial or all financing of major capital projects and minimize debt service payments. The
account is also intended to cover unforeseen capital replacements due to equipment breakdowns,
storms or hurricane damages. Amounts used to finance projects shall be replenished by the
operating revenues of the Electric Revenue Fund over the succeeding seven (7) years of any
project completion
10. The total of the combined Electric Revenue and Electric Improvement & Extension Fund budget
and reserve balances shall be benchmarked at 50% Budgeted Operating Revenues. Operating
Fund Budget Balance and Reserves shall be adjusted to appropriate levels through adjustments
in the operating budget. Improvement & Extension Fund Budget Balance and Reserves shall be
adjusted in accordance with the Capital Improvement Plan.
115
Page 121
Investment and Cash Management Policy
1. The City will deposit all receipts on a timely basis in interest bearing accounts.
2. The City will strive to maximize the return on its investment portfolio without jeopardizing
principal amounts.
3. The City will limit its investments to the types of securities provided for by Delaware statutes.
4. The City will diversify its investments by maturity date to protect against market fluctuations.
5. The City will purchase securities from qualified institutions based on competitive bids in an
effort to obtain the highest available rates.
6. The City will maintain an Investment Policy based on prudent investment practices and will
monitor all investment managers’ compliance with policy objectives.
Capital Improvement Policy
1. The City will prepare and update, as needed a five-year Capital Improvements Program (CIP)
which will provide for the orderly maintenance, replacement, and expansion of capital assets.
2. The CIP will identify long-range capital projects and capital improvements of all types, which
will be coordinated with the annual operating budget to maintain full utilization of available
revenue sources.
3. When preparing the CIP, the City will seek to identify all viable capital projects and capital
improvements required during the subsequent five-year period. These projects and
improvements will be prioritized by year and by funding source.
4. Every attempt will be made to match projects and improvements with available funding sources.
Future operating costs and savings associated with a project or an improvement will also be
given consideration in the establishment of priorities.
5. When appropriate, the City will seek Federal, State, and other funding to assist in financing
capital projects and capital improvements.
6. The City will incorporate the reasonable findings and recommendations of other cities’ Boards,
Commissions, Committees, and Citizen Task Forces, as they relate to capital projects and
improvements.
7. The City will seek input from the public by holding public hearings in relation to the
establishment of projects and project priorities.
Financial Reporting Policy
1. The City’s accounting system will maintain records in accordance with accounting standards
and principles outlined by the Governmental Accounting Standards Board (GASB), Financial
Accounting Standards Board (FASB), and the State of Delaware.
116
Page 122
2. The City will employ an independent accounting firm to perform an annual audit of the City’s
finances and make the annual audit available to all required and interested parties.
3. The City will produce monthly and quarterly financial statements reporting the current periods’
activity for all funds maintained by the City.
4. The City will prepare an annual budget document that provides a basic understanding of the
City’s planned financial operations for the coming fiscal year. Copies of the proposed and final
budget will be made available to all interested parties and opportunities will be provided for
citizen input prior to final decisions on the budget.
5. The City will place continued emphasis on review and maintenance of an accounting system
which provides strong internal budgetary and accounting controls designed to provide
reasonable assurance, but not absolute, assurance regarding:
(a) the safeguarding of assets against loss from unauthorized use or disposition and,
(b) the reliability of financial records for preparing financial statements and reports, and the
maintaining accountability for assets.
6. The City will seek annual renewal of the Government Finance Officers Association’s (GFOA)
Certificate of Achievement for Excellence in Financial Reporting.
7.
Adoption:
Approval by City Council: January 28, 2002
Most recent amendments:
1. Amended by City Council on June 11, 2014
2. Amended by City Council on September 8, 2014
3. Amended by City Council on October 12, 2015
117
Page 123
CITY OF DOVER
DEPARTMENT OF FINANCE
POLICY MANUAL
TITLE: Budget Administration – Policy
for Operating Departments DATE: September 8, 2014
Each Department Head is responsible for managing their overall budgets for account variances
created by routine operating expenses. This policy is intended to permit the redistribution of funds in
departmental budgets when unexpected events or transactions occur. It establishes the procedure to
be followed when the approval of a supplemental appropriation is requested. It restricts the
redistribution of personnel and capital outlay accounts. All redistributions are to be rounded to the
nearest hundred dollars (no cents).
1. Definitions, as used in this policy:
“Fund”: In governmental accounting, a fund is a fiscal and accounting entity with a self-
balancing set of accounts, created and maintained for a particular purpose and having
transactions subject to legal or administrative restrictions. A separate budget is provided for
each fund.
“Department”: Departments are the major organizational sub-divisions. They have a broad
overall purpose. The City of Dover is organized into twelve (12) departments: City Clerk,
City Manager, Customer Services, Electric, Information Services, Finance and Procurement
& Inventory, Human Resources, Planning & Inspections and Parks & Recreation & Library,
Police, Public Works, and Tax Assessor.
“Division”: Is the major operational areas of the City. Each Division has been assigned to
one of the Departments listed above according to the type of activity it performs. For
example, the Electric Engineering Division is part of the Electric Department.
“Category”: Within each division, each expenditure line item is grouped into a category of
related expenditures. The budget for each line item is listed by categorical total. Examples of
a category include personnel services, materials & supplies, administrative expenditures,
capital outlay, project accounts, and depreciation.
2. Department Managers may redistribute monies “within” a group of accounts in a particular
category, except salary/benefits, and capital outlay accounts to address unexpected events or
transactions. Form COD #98 shall be used to request the transfer of funds. The monies shall
not be encumbered until the Controller/Treasurer has returned a copy of Form COD #98
advising the manager that the redistribution has been entered into the budget software.
3. Transfers between categories material/supplies and administrative are permitted.
4. Transfers from salary and benefit accounts are permitted upon the approval of the City
Council to cover unanticipated expenses created by vacancies. Budget savings from these
line items will transferred to the pension and OPEB funds towards the City’s unfunded
liability.
118
Page 124
Budget Administration – Policy for Operating Departments
5. The redistribution request must be submitted to the Finance Department for verification and
confirmation, and then Finance will forward to the City Manager. Confirmation of the change
will be made to the originating department by the Finance Department once the change has
been approved.
6. No funds authorized in capital outlay may be encumbered unless said purchase was detailed
in the “approved” budget.
Any Capital Improvement Project (CIP) deferrals due to cost over-runs in other CIP items
shall be communicated to the Council and the Controller/Treasurer.
The City Manager may approve transfers of savings from completed CIP items to non-
completed CIP items. Any transfers that cause the particular item or project to exceed its
original budget 10% or greater will be communicated to Council and the Controller/Treasurer.
To request an exception in capital outlay or project categories, submit a written memorandum
explaining the request and attach a copy of the original budget submission. The memorandum
must explain the reason for not purchasing the authorized items. A copy noting the action
taken on the request by the City Manager will be returned to the respective department.
Council and the Controller/Treasurer will be copied on all exception request approvals.
All capital outlay change requests must be accompanied by a Capital Improvement Project
worksheet in the following instances:
- Scrap a CIP and create a new CIP
- Reduce approved CIP and create a new CIP
- New funded CIP (grant)
The Controller/Treasurer will adjust project budgets each year to include prior year project
balances before finalizing the Carry Forward Budget Balances for multi-year projects or
projects not completed due to unforeseen circumstances. This process will be followed only
on projects that were approved by City Council in a prior year CIP.
7. The City Manager may approve intra-fund transfers (i.e., within the General Fund) of up to
five percent per annum, Form COD #98, with the exception of line items associated with
salary and benefits.
8. All personnel positions will receive and be adhered to, the documented increases as approved
through the budget process. Any exceptions require Council approval.
9. Budget amendments exceeding that authorized above or that affect budget balances shall be
referred to the City Council.
119
Page 125
CITY OF DOVER
COST CENTER REQUEST FOR BUDGET AMENDMENT
Department: Fiscal Year:
From Account #: Date of Request:
To Account #: (Check Only One)
Change Within Budget
Supplemental Appropriation
By: Departmental Transfers
(Signature)
Net Current Requested
Element Account Original Previous Revised Change or Adjusted YTD
Object Name Budget Changes Budget Supplement Budget Expense
FROM
TO
1 2 3 4 5 6 7 8
Request Justification:
Instructions: Complete all appropriate items. Figures in columns four and seven must be preceded by a "plus"
or a "minus" sign. Round all figures to nearest one hundred dollar. Use the reverse side of this form if additional
space is needed to justify request. Form must bear the live signature(s) of cost center manager(s). Before
submitting request to Finance Department for consideration, obtain verification from the accounting department that
all figures are correct. Submit copy of request to the City Manager. A copy will be returned noting the action taken.
Approval:
City Manager Controller/Treasurer
Date of Action:
Approved as: Requested Approved as Modified Denied
Deferred Until:
For Finance Department Use Only Processed: By:
COD FINANCE FORM 98
120
Page 127
FY 2018 DRAFT ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
City of Dover
Fiscal Year 2018 Budget
Personnel Table
2015‐2016 2016‐2017 2017‐2018
DEPT/DIVISION
BUDGET BUDGET BUDGET CHANGE
CITY CLERK 4.0 4.0 4.0 0.0
CITY MANAGER 4.0 4.0 5.0 1.0
CODE ENFORCEMENT 5.0 5.0 5.0 0.0
CUSTOMER SERVICES 14.0 13.0 16.0 3.0
ECONOMIC DEVELOPMENT 3.0 0.0 0.0 0.0
FACILITIES MANAGEMENT 7.0 5.0 5.0 0.0
FINANCE 8.0 8.0 8.0 0.0
FIRE DEPARTMENT 5.0 5.0 5.0 0.0
FLEET MAINTENANCE 6.0 6.0 6.0 0.0
GROUNDS 13.0 13.0 13.0 0.0
HUMAN RESOURCES 3.0 3.0 3.0 0.0
INFORMATION TECHNOLOGY 4.0 4.0 4.0 0.0
INSPECTIONS 6.0 6.0 6.0 0.0
LIBRARY 13.0 13.0 13.0 0.0
LIFE SAFETY 3.0 3.0 3.0 0.0
MAYOR 1.0 1.0 1.0 0.0
PARKS AND RECREATION 5.0 5.0 5.0 0.0
PLANNING 6.0 6.0 6.0 0.0
POLICE ‐ TOTAL* 134.0 134.0 134.0 0.0
PROCUREMENT AND INVENTORY 3.0 3.0 3.0 0.0
PUBLIC WORKS ‐ ADMINISTRATION 6.0 6.0 6.0 0.0
PUBLIC WORKS ‐ ENGINEERING 3.0 3.0 3.0 0.0
SANITATION 10.0 10.0 10.0 0.0
STREETS 8.0 8.0 8.0 0.0
TAX ASSESSOR 3.0 3.0 3.0 0.0
GENERAL FUND AND CDBG TOTAL 277.0 271.0 275.0 4.0
ELECTRIC ADMINISTRATION 4.0 5.0 5.0 0.0
ELECTRIC SYSTEM OPERATIONS 5.0 5.0 5.0 0.0
ELECTRIC ENGINEERING 10.0 10.0 10.0 0.0
ELECTRIC T & D 24.0 24.0 24.0 0.0
METER READING ‐ CUSTOMER SERVICE 4.0 4.0 4.0 0.0
ELECTRIC FUND TOTAL 47.0 48.0 48.0 0.0
WATER/WASTEWATER ENGINEERING 5.0 5.0 5.0 0.0
WATER MANAGEMENT 6.0 6.0 6.0 0.0
WASTEWATER MANAGEMENT 11.0 11.0 11.0 0.0
WATER TREATMENT PLANT 13.0 13.0 13.0 0.0
WATER/WASTEWATER FUND TOTAL 35.0 35.0 35.0 0.0
TOTAL FULL‐TIME PERSONNEL 359.0 354.0 358.0 4.0
*101 Officers; 33 Civilians ‐ 134 Total Employees
2015‐2016 2016‐2017 2017‐2018
DEPT/DIVISION
BUDGET BUDGET BUDGET CHANGE
PART‐TIME PERSONNEL
CITY COUNCIL COMMITTEES 17.0 17.0 17.0 0.0
CITY MANAGER 4.0 4.0 0.0 (4.0)
PLANNING COMMISSION 14.0 14.0 14.0 0.0
FIRE (5 On Call Dispatchers) 3.0 5.0 5.0 0.0
PARKS AND RECREATION 14.0 14.0 14.0 0.0
LIBRARY 19.0 19.0 21.0 2.0
PROCUREMENT AND INVENTORY 1.0 1.0 1.0 0.0
CUSTOMER SERVICES 4.0 4.0 2.0 (2.0)
METER READING ‐ CUSTOMER SERVICE 0.0 0.0 1.0 1.0
FINANCE 1.0 0.0 0.0 0.0
INFORMATION TECHNOLOGY 1.0 1.0 0.0 (1.0)
ELECTRIC ENGINEERING 0.0 1.0 1.0 0.0
SUBSTANCE ABUSE GRANT 10.0 10.0 10.0 0.0
POLICE CADET ‐ GRANT 6.0 6.0 1.0 (5.0)
TOTAL PART‐TIME PERSONNEL 94.0 96.0 87.0 (9.0)
TOTAL PERSONNEL 453.0 450.0 445.0 (5.0)
122
Page 128
FY 2018 DRAFT ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
City of Dover
Fiscal Year 2018 Budget
Fiscal Year 2018
Total City by Fund
Dept/Div Division Base Pay Bonus/Allow./SD Overtime Part Time/Temp Total Total Total
Number Title 10‐11 On Call 10‐11 10‐12 10‐13 Wages Benefits Personnel
1100‐511 City Clerk $ 228,300 $ ‐ $ ‐ $ ‐ $ 228,300 $ 154,100 $ 382,400
1200‐512 City Council ‐ ‐ ‐ 84,300 84,300 6,700 91,000
1300‐513 Assessor 130,500 ‐ ‐ ‐ 130,500 78,500 209,000
1400‐514 Fire 214,500 600 35,000 25,000 275,100 167,300 442,400
1500‐522 Grounds 484,800 2,200 10,000 ‐ 497,000 408,400 905,400
1500‐523 Library 614,400 ‐ 3,700 305,000 923,100 495,700 1,418,800
1500‐525 Recreation 235,600 ‐ 1,600 122,800 360,000 152,700 512,700
1600‐531 Life Safety 138,900 9,700 8,000 ‐ 156,600 76,200 232,800
1600‐532 Code Enforcement 228,400 700 2,500 ‐ 231,600 188,700 420,300
1600‐533 Planning 380,700 (36,000) 1,000 15,000 360,700 171,600 532,300
1600‐534 Building Inspections 282,600 ‐ 2,000 ‐ 284,600 242,100 526,700
1700‐542 Civilian Police 1,478,200 26,100 69,200 ‐ 1,573,500 1,178,200 2,751,700
1700‐543 Law Enforcement 7,398,800 209,100 460,000 ‐ 8,067,900 4,427,300 12,495,200
1700‐544 Police Extra Duty 492,000 ‐ ‐ ‐ 492,000 68,000 560,000
1800‐554 Streets 323,500 1,700 7,900 ‐ 333,100 323,400 656,500
1800‐555 Sanitation 393,500 1,300 17,500 ‐ 412,300 359,000 771,300
2100‐515 City Manager 386,000 ‐ 1,500 ‐ 387,500 170,700 558,200
2200‐516 Information Technology 247,300 ‐ ‐ ‐ 247,300 189,400 436,700
2300‐517 Finance 517,200 ‐ ‐ ‐ 517,200 316,000 833,200
2400‐551 Public Works Admin 373,500 500 ‐ ‐ 374,000 308,900 682,900
2500‐552 Facilities 241,300 700 6,400 ‐ 248,400 235,300 483,700
2600‐553 Public Works Engineering 151,900 400 500 ‐ 152,800 102,700 255,500
2700‐571 Procurement & Inventory 168,700 ‐ 1,000 22,500 192,200 137,800 330,000
2800‐572 Fleet Maintenance 288,000 3,300 6,700 ‐ 298,000 196,600 494,600
2900‐529 Customer Service 638,100 ‐ ‐ 39,100 677,200 434,200 1,111,400
3100‐518 Human Resources 187,100 ‐ ‐ ‐ 187,100 175,600 362,700
3200‐519 Mayor 45,000 ‐ ‐ ‐ 45,000 12,300 57,300
Total General Fund $ 16,268,800 $ 220,300 $ 634,500 $ 613,700 $ 17,737,300 $ 10,777,400 $ 28,514,700
Dept/Div Division Base Pay Bonus/Allow./SD Overtime Part Time/Temp Total Total Total
Number Title 10‐11 On Call 10‐11 10‐12 10‐13 Wages Benefits Personnel
2600‐553 Engineering $ 316,300 $ 900 $ 500 $ ‐ $ 317,700 $ 132,400 $ 450,100
6800‐568 Water 287,600 8,200 12,000 ‐ 307,800 220,300 528,100
6900‐569 Wastewater 393,500 13,200 25,000 ‐ 431,700 236,700 668,400
7600‐576 Water Treatment 602,700 6,000 30,000 ‐ 638,700 445,200 1,083,900
Total Water/Wastewater Fund $ 1,600,100 $ 28,300 $ 67,500 $ ‐ $ 1,695,900 $ 1,034,600 $ 2,730,500
Dept/Div Division Base Pay Bonus/Allow./SD Overtime Part Time/Temp Total Total Total
Number Title 10‐11 On Call 10‐11 10‐12 10‐13 Wages Benefits Personnel
8200‐562 T&D $ 1,593,800 $ 49,200 $ 106,800 $ ‐ $ 1,749,800 $ 939,300 $ 2,689,100
8300‐563 Engineering 616,200 10,800 10,000 10,600 647,600 276,000 923,600
8400‐564 Administration 337,500 ‐ ‐ ‐ 337,500 135,700 473,200
8500‐565 Meter Reading 184,100 8,100 19,100 12,500 223,800 139,200 363,000
8600‐526 System Operators 352,000 5,200 72,900 ‐ 430,100 214,600 644,700
Total Electric Fund $ 3,083,600 $ 73,300 $ 208,800 $ 23,100 $ 3,388,800 $ 1,704,800 $ 5,093,600
Dept/Div Division Base Pay Bonus/Allow./SD Overtime Part Time/Temp Total Total Total
Number Title 10‐11 On Call 10‐11 10‐12 10‐13 Wages Benefits Personnel
9900‐596 CDBG $ ‐ $ 36,000 $ ‐ $ ‐ $ 36,000 $ ‐ $ 36,000
9900‐542 Police Cadet Program ‐ ‐ ‐ 11,900 11,900 1,600 13,500
1500‐581 Substance Abuse Grant ‐ ‐ ‐ 62,700 62,700 5,000 67,700
Total Grant Funds $ ‐ $ 36,000 $ ‐ $ 74,600 $ 110,600 $ 6,600 $ 117,200
GRAND TOTAL $ 20,952,500 $ 357,900 $ 910,800 $ 711,400 $ 22,932,600 $ 13,523,400 $ 36,456,000
123
Page 129
FY 2018 DRAFT ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
CITY OF DOVER
OVERTIME COMPARISON
FISCAL YEAR 2015 THROUGH 2018
2015 2016 2017 THROUGH APRIL 2018
DEPARTMENT Orig. Budget Actual Variance % To Date Orig. Budget Actual Variance % To Date Orig. Budget Actual Variance % To Date Proposed
TAX ASSESSOR ‐ ‐ ‐ ‐‐‐ ‐ ‐ ‐ ‐‐‐ ‐ 42 (42) ‐‐‐ ‐
FIRE 32,000 43,706 (11,706) 136.6% 43,000 32,036 10,964 74.5% 43,000 28,040 14,960 65.2% 35,000
GROUNDS 11,100 12,002 (902) 108.1% 8,300 12,687 (4,387) 152.9% 12,200 5,566 6,634 45.6% 10,000
PARKS & RECREATION ‐ 398 (398) ‐‐‐ 1,500 1,710 (210) 114.0% 1,600 1,370 230 85.6% 1,600
LIBRARY 3,900 3,714 186 95.2% 5,600 2,892 2,708 51.6% 3,700 3,762 (62) 101.7% 3,700
LIFE SAFETY 7,600 8,683 (1,083) 114.2% 8,600 8,308 292 96.6% 8,000 2,432 5,568 30.4% 8,000
CODE ENFORCEMENT 2,000 1,891 109 94.5% 5,000 2,063 2,937 41.3% 2,500 1,930 570 77.2% 2,500
PLANNING ‐ 282 (282) ‐‐‐ 700 856 (156) 122.3% 1,000 2,287 (1,287) 228.7% 1,000
PUBLIC INSPECTIONS 1,800 2,084 (284) 115.8% 1,800 3,722 (1,922) 206.8% 2,000 3,059 (1,059) 153.0% 2,000
POLICE CIVILIAN 50,000 82,711 (32,711) 165.4% 66,400 87,113 (20,713) 131.2% 70,900 63,077 7,823 89.0% 69,200
POLICE LAW ENFORCEMENT 400,000 433,344 (33,344) 108.3% 445,000 426,556 18,444 95.9% 450,600 342,117 108,483 75.9% 460,000
STREET 4,700 7,574 (2,874) 161.1% 4,100 7,457 (3,357) 181.9% 7,900 3,309 4,591 41.9% 7,900
SANITATION 12,100 17,988 (5,888) 148.7% 12,100 17,945 (5,845) 148.3% 17,500 12,328 5,172 70.4% 17,500
CITY MANAGER 2,000 517 1,483 25.9% 2,000 1,192 808 59.6% 2,000 658 1,342 32.9% 1,500
FINANCE ‐ 37 (37) ‐‐‐ ‐ 12 (12) ‐‐‐ ‐ 165 (165) ‐‐‐ ‐
PW ADMINISTRATION ‐ ‐ ‐ ‐‐‐ ‐ ‐ ‐ ‐‐‐ ‐ 209 (209) ‐‐‐ ‐
FACILITIES MANAGEMENT 10,500 11,771 (1,271) 112.1% 10,500 8,673 1,827 82.6% 6,400 1,803 4,597 28.2% 6,400
PROCUREMENT & INVENTORY 1,600 756 844 47.2% 1,000 489 511 48.9% 1,000 1,059 (59) 105.9% 1,000
VEHICLE MAINTENANCE 1,000 6,302 (5,302) 630.2% 1,000 6,582 (5,582) 658.2% 6,700 3,983 2,717 59.4% 6,700
CUSTOMER SERVICES ‐ ‐ ‐ ‐‐‐ 200 123 77 61.6% ‐ 226 (226) ‐‐‐ ‐
HUMAN RESOURCES ‐ ‐ ‐ ‐‐‐ ‐ 159 (159) ‐‐‐ ‐ ‐ ‐ ‐‐‐ ‐
WATER ENGINEERING 1,600 943 657 58.9% 800 ‐ 800 0.0% 1,500 1,825 (325) 121.7% 1,000
CONSTRUCTION & MAINT 7,100 6,743 357 95.0% ‐ ‐ ‐ ‐‐‐ ‐ ‐ ‐ ‐‐‐ ‐
WATER 9,100 8,632 468 94.9% 13,400 13,151 249 98.1% 12,000 9,395 2,605 78.3% 12,000
WASTE‐WATER 27,000 23,559 3,441 87.3% 27,000 14,596 12,404 54.1% 25,000 18,133 6,867 72.5% 25,000
WATER TREATMENT PLANT 34,800 26,750 8,050 76.9% 32,300 45,843 (13,543) 141.9% 30,000 39,079 (9,079) 130.3% 30,000
TRANSMISSION/DISTRIBUTION 115,000 111,864 3,136 97.3% 115,000 112,131 2,869 97.5% 106,800 99,547 7,253 93.2% 106,800
ELECTRIC ENGINEERING 11,000 7,792 3,208 70.8% 11,000 5,337 5,663 48.5% 11,100 3,507 7,593 31.6% 10,000
ELECTRIC ADMINISTRATION 2,000 91 1,909 4.6% 2,000 ‐ 2,000 0.0% ‐ ‐ ‐ ‐‐‐ ‐
ELECTRIC METERING 5,000 13,155 (8,155) 263.1% 11,100 15,739 (4,639) 141.8% 19,100 11,377 7,723 59.6% 19,100
ELECTRIC SYSTEMS OPERATIONS 50,000 77,426 (27,426) 154.9% 50,000 70,385 (20,385) 140.8% 72,900 72,812 88 99.9% 72,900
TOTAL 802,900 910,713 (107,813) 113.4% 879,400 897,757 (18,357) 102.1% 915,400 733,098 182,302 80.1% 910,800
ELECTRIC PLANT OPERATIONS 198,700 230,378 (31,678) 115.9% 209,200 238,400 (29,200) 114.0% 185,500 203,601 (18,100.77) 109.8% 185,500
POLICE EXTRA DUTY 633,300 478,834 154,466 75.6% 529,200 609,839 (80,639) 115.2% 689,800 382,425 307,374.61 55.4% 560,000
124
Page 131
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
FUNDING SOURCE SUMMARY
Source FY 18 FY 19 FY 20 FY 21 FY 22 Total
Capital Asset Reserve 418,300 418,300
DE Sewer Revolving Loan Fund 250,000 250,000
Developer Contribution 620,000 620,000 620,000 620,000 620,000 3,100,000
Electric I & E Fund 2,882,200 2,882,200
Electric Revenue 3,324,800 6,878,400 3,639,000 3,300,000 2,940,000 20,082,200
Future Capacity Reserve Fund 6,000,000 6,000,000
General Fund 1,372,900 8,136,800 9,849,600 5,642,900 3,740,700 28,742,900
Impact Fee Reserve 555,200 52,800 27,600 460,000 1,095,600
Parkland Reserve Fund 205,000 15,000 50,000 15,000 40,000 325,000
State Grant 33,000 35,000 33,000 40,000 141,000
Water/Wastewater Fund 3,051,400 5,764,500 5,546,200 3,021,500 5,552,000 22,935,600
GRAND TOTAL 11,907,600 22,219,900 25,792,600 12,660,000 13,392,700 85,972,800
Friday, May 12, 2017
126
Page 132
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
DEPARTMENT SUMMARY
Department FY 18 FY 19 FY 20 FY 21 FY 22 Total
Code Enforcement 23,800 17,000 40,800
Electric Admin 8,500 1,175,200 1,183,700
Electric Engineering 1,315,000 3,386,700 8,320,000 2,210,000 2,050,000 17,281,700
Electric T & D 1,675,500 1,280,500 1,250,000 1,160,000 1,180,000 6,546,000
Facilities Management 25,100 28,800 32,200 86,100
Finance 1,500,000 500,000 506,000 2,506,000
Fire/Robbins Hose 184,100 298,600 229,700 229,700 229,700 1,171,800
Fleet Maintenance 27,000 60,000 87,000
Information Technology 36,600 35,600 41,600 81,600 21,600 217,000
Parks and Recreation 271,000 15,000 85,000 81,000 80,000 532,000
Permtting and Inspections 16,000 34,000 50,000
Police 379,900 832,600 3,365,400 417,000 452,700 5,447,600
Power Plant 2,328,000 1,656,000 689,000 550,000 330,000 5,553,000
Public Works - Grounds 62,500 188,000 153,000 151,000 52,000 606,500
Public Works - Sanitation 435,100 427,100 204,900 807,700 1,874,800
Public Works - Streets 1,070,000 6,043,100 5,304,200 4,400,500 2,177,000 18,994,800
Public Works Admin 42,000 42,000
W/WW Engineering 23,000 32,900 28,900 38,000 122,800
Wastewater Management 1,493,000 3,462,100 1,563,500 1,443,100 2,676,100 10,637,800
Water Management 1,558,400 1,443,500 2,184,100 1,577,100 3,297,900 10,061,000
Water Treatment Plant 1,378,100 1,552,300 2,930,400
TOTAL 11,907,600 22,219,900 25,792,600 12,660,000 13,392,700 85,972,800
Friday, May 12, 2017
127
Page 134
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
FUNDING SOURCE SUMMARY
Source FY 18 FY 19 FY 20 FY 21 FY 22 Total
Capital Asset Reserve 104,100 104,100
General Fund 1,139,600 6,080,800 7,975,400 4,019,600 1,421,600 20,637,000
Parkland Reserve Fund 205,000 15,000 50,000 15,000 40,000 325,000
State Grant 33,000 35,000 33,000 40,000 141,000
GRAND TOTAL 1,481,700 6,095,800 8,060,400 4,067,600 1,501,600 21,207,100
Wednesday, May 10, 2017
129
Page 135
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
PROJECTS BY DEPARTMENT
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
Information Technology
Back Up & Recovery System with Software IT1800 1 15,000 15,000
Network Infrastrucure IT1801 2 21,600 21,600 21,600 21,600 21,600 108,000
Server Lifecycle IT1900 3 14,000 20,000 60,000 94,000
Information Technology Total 36,600 35,600 41,600 81,600 21,600 217,000
Parks and Recreation
Park and Playground Improvement Program PR1800 3 66,000 66,000 132,000
Small Park Improvements PR1801 4 15,000 15,000 15,000 15,000 60,000
Schutte Park Land Improvements PR1802 1 190,000 190,000
Silver Lake Park - Master Plan&Plan Implementation PR2000 1 70,000 80,000 150,000
Parks and Recreation Total 271,000 15,000 85,000 81,000 80,000 532,000
Police
Police Station Roof Repair PD1800 n/a 53,100 53,100
Police Station Impound Lot PD1801 n/a 51,000 51,000
Server Consolidation PD1900 1 66,000 66,000
Evidence Room Asbestos Abatement PD1901 n/a 20,000 20,000
Police Station Chiller Replacement PD1902 n/a 250,000 250,000
New Evidence Facility PD2003 n/a 3,000,000 3,000,000
Police Total 104,100 336,000 3,000,000 3,440,100
Public Works - Streets
Street, Concrete and Alley program ST1801 1 950,000 1,001,200 1,867,800 936,000 1,168,000 5,923,000
Miscellaneous Emergency Storm Sewer Repairs ST1802 2 70,000 73,000 76,000 79,000 82,000 380,000
Meeting House Branch Improvements ST1803 3 2,740,000 2,740,000 2,740,000 8,220,000
Redevelopment of Schutte Park ST1804 4 1,800,000 1,800,000
Dover Library Conveyance System Improvements ST1805 4 50,000 200,000 250,000
Water Street Flooding Improvements ST1906 6 50,000 100,000 150,000
Brine Manufacturing System ST1907 6 45,000 45,000
The Greens of Dover/Lamplighter Ln Strmwtr Impr ST2005 6 50,000 150,000 200,000
Reed Street Flooding Improvements ST2104 4 50,000 50,000
Public Works - Streets Total 1,070,000 5,709,200 4,933,800 3,905,000 1,400,000 17,018,000
GRAND TOTAL 1,481,700 6,095,800 8,060,400 4,067,600 1,501,600 21,207,100
Wednesday, May 10, 2017
130
Page 136
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Information Technology
City of Dover, Delaware Contact IT Director
Type Technology
Project # IT1800
Useful Life 5 years
Project Name Back Up & Recovery System with Software Category Information Technology
New Project: Yes Account Number: 147-2200-516.40-28 Priority 1
Time-Line: FY18 Status Active
Total Project Cost: $15,000
Description
Due to exponential growth in and dependence on data, the City has out grown its backup and recovery capabilities. The equipment in place was
purchased in 2013 and was sized to account for growth. Since its purchase, City Department’s use of Fortis document imaging has expanded to
consume 400% more disk space. Additionally, several departments rely more and more on video/graphic evidence resulting in significant increases
due to pictures and video.
To save money on server license fees and hardware replacement, the IT Department has virtualized many of its servers. This has reduced the
number of physical servers and licenses required. It has also increased efficiency to deliver necessary services to the end users. We have gone from
having 19 physical servers to having seven. Two of those servers are hosts for over 20 virtual servers. Although the virtual servers save on physical
space and electricity, it is a lot more to manage and they still need to be backed up.
Justification
Our backup process is very complicated. Due to time constraints, we modified the backups to do a complete backup on the weekends with
incremental backups during the week. During the week, we’re backing up the changes that have been made since the last full backup. The backup
is stored locally on the backup server and duplicated to a tape. The full backups start on Friday evening and do not complete until mid-day on
Monday. There’s not enough time in the day to get the backup duplicated to tape prior to Monday’s backup starting. Additionally, due to the size
or the backup jobs, our ability to store multiple versions of the backup locally have been greatly reduced. Whereas a week’s worth of data used to
be stored locally, we can save only one to two days’ worth of data. This does not provide the City with sufficient backup or disaster recovery peace
of mind. The backup server does not provide any available scalability to add additional storage space.
I recommend the purchase of a new backup appliance and backup software that can grow with the City’s data. I’m recommending a Dell DL1300
appliance with 4TB of storage. The unit is scalable to as much as 18TB. The cost of the unit inclludes five years of licensed software. For the near
term, the City has storage capacity to replicate the backup to a different location for disaster recovery. As the technology and prices continue to
improve, it may be beneficial to replicate our backup to a cloud provider for improved disaster recovery.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 15,000 15,000
Total 15,000 15,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 15,000 15,000
Total 15,000 15,000
Budget Impact/Other
Friday, May 12, 2017
131
Page 137
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Information Technology
City of Dover, Delaware Contact IT Director
Type Technology
Project # IT1801
Useful Life 10 years
Project Name Network Infrastrucure Category Information Technology
New Project: Account Number: 147-2200-516.40-28 Priority 2
Time-Line: Status Active
Total Project Cost: $108,000
Description
The City's netwok infrastrucure (switches and routers) were installed as part of the telephone upgrade in 2006. It consists of approximately 18
switches, 6 routers. All of this equipment is at or nearing Cisco's End of Support/End of Life requiring a phased replacement plan.
Justification
Vital network switching and routing equipment allow for communication between servers, computers, printers, telephones, etc.. A loss of any one
piece of equipment will prevent up to 48 devices to stop communicating. With no support for the current equipment, it could be an extended
outage while completing an unplanned purchase. This plan is critical to maintaining the level of communication and support expected by all users.
It calls for a 20% replacement schedule across 5 years until all equipment is replaced and supported.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 21,600 21,600 21,600 21,600 21,600 108,000
Total 21,600 21,600 21,600 21,600 21,600 108,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 21,600 21,600 21,600 21,600 21,600 108,000
Total 21,600 21,600 21,600 21,600 21,600 108,000
Budget Impact/Other
Friday, May 12, 2017
132
Page 138
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Information Technology
City of Dover, Delaware Contact IT Director
Type Technology
Project # IT1900
Useful Life 3 - 5 Years
Project Name Server Lifecycle Category Information Technology
New Project: Account Number: 147-2200-516.40-28 Priority 3
Time-Line: Status Active
Total Project Cost: $94,000
Description
As with the computer lifecycle, the servers are on a lifecycle and require planned replacements. When a server is up for replacement, it is evaluated
for continued use beyond the lifecycle timeframe. As long as it's viable and service can be extended, its service life will be extended. This plan
includes the replacement of DOVERDC1 and the SQL server in FY18, two HyperV servers in FY19, and the Storage Area Network (SAN) in
FY20
Justification
Due to the City's growing need and dependency on data, servers and storage requirements iincrease. The increased demands on equipment and
storage makes it necessary to replace aging equipment. Obtaining extended warranties may be used when possible, but it can be more cost effective
to replace with newer technology. Servers and associated equipment listed in this plan are to ensure continued 99.999% availability.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 14,000 20,000 60,000 94,000
Total 14,000 20,000 60,000 94,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 14,000 20,000 60,000 94,000
Total 14,000 20,000 60,000 94,000
Budget Impact/Other
Friday, May 12, 2017
133
Page 139
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Parks and Recreation
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # PR1800
Useful Life 10-15 years
Project Name Park and Playground Improvement Program Category General
New Project: No Account Number: 147-1500-525.40-31 Priority 3
Time-Line: FY17-FY20 Status Active
Total Project Cost: $132,000
Description
This project provides for a regular replacement of playground equipment and other park amenities throughout the park system. It could also
potentially include installation of playground equipment in parks without equipment. This is important to ensure that equipment is replaced as old
equipment deteriorates and becomes less safe. All newly installed equipment will meet the standards of the Consumer Product Safety Commission.
Justification
As equipment ages it deteriorates and can become unsightly and/or unsafe. Replacement of dated equipment is important to ensure that our parks
meet the needs of the population and provides a safe play environment.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 66,000 66,000 132,000
Total 66,000 66,000 132,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 33,000 33,000 66,000
State Grant 33,000 33,000 66,000
Total 66,000 66,000 132,000
Budget Impact/Other
Friday, May 12, 2017
134
Page 140
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Parks and Recreation
City of Dover, Delaware Contact Parks & Recreation Director
Type Improvement
Project # PR1801
Useful Life 10-15 years
Project Name Small Park Improvements Category General
New Project: No Account Number: 147-1500-525.40-31 Priority 4
Time-Line: FY17-FY20 Status Active
Total Project Cost: $60,000
Description
Under this project, the City would fund small capital improvements in parks citywide. This could include improvements to pavilions, fencing and
other structures in the park that require investment over time but exceed the thresholds for non-capital investments.
Justification
There are a number of amenities in the City’s park that deteriorate over time and require small capital investments to be safe and attractive. As our
park investments age, we need to make sure that we are maintaining the properties, which may require small capital projects.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 15,000 15,000 15,000 15,000 60,000
Total 15,000 15,000 15,000 15,000 60,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Parkland Reserve Fund 15,000 15,000 15,000 15,000 60,000
Total 15,000 15,000 15,000 15,000 60,000
Budget Impact/Other
$5K donated from Councilman Hosfelt toward Bicentennial Village Park for benches and other amenities (Discretionary funds FY2017)
Friday, May 12, 2017
135
Page 141
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Parks and Recreation
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # PR1802
Useful Life 50 years
Project Name Schutte Park Land Improvements Category General
New Project: No Account Number: 147-1500-525.40-31 Priority 1
Time-Line: FY18 Status Active
Total Project Cost: $190,000
Description
This project includes a plan to develop multipurpose fields on the lands on the west side of the park and to complete the multipurpose pathway
around the park’s perimeter. It will also include other amenities that are consistent with the Recreation Needs Assessment. Once plans are
complete, the improvements will be constructed in FY 18.
Justification
Currently, the Schutte Park addition is unusable. There is constant demand for field space, and we have 14 acres of unusable space.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 190,000 190,000
Total 190,000 190,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Parkland Reserve Fund 190,000 190,000
Total 190,000 190,000
Budget Impact/Other
Friday, May 12, 2017
136
Page 142
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Parks and Recreation
City of Dover, Delaware Contact Parks & Recreation Director
Type Improvement
Project # PR2000
Useful Life
Project Name Silver Lake Park - Master Plan&Plan Implementation Category General
New Project: No Account Number: 147-1500-525.40-31 Priority 1
Time-Line: FY18-FY20 Status Active
Total Project Cost: $150,000
Description
Hire a consultant to develop a master plan for Silver Lake Park that includes a vegetation management plan and lighting plan, and also addresses
the needs identified in the Recreation Needs Assessment, including paths, restrooms, a splash pad, and other general park improvements such as
parking lot improvements and delineation and preservation of the African American Cemetery on the property. The Silver Lake Commission and
DNREC would be part of the planning process.
Justification
The plan for Silver Lake Park needs to be updated based on current need as identified in the Recreation Needs Assessment.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 70,000 80,000 150,000
Total 70,000 80,000 150,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Parkland Reserve Fund 35,000 40,000 75,000
State Grant 35,000 40,000 75,000
Total 70,000 80,000 150,000
Budget Impact/Other
Friday, May 12, 2017
137
Page 143
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Police
City of Dover, Delaware Contact Police Chief
Type Maintenance
Project # PD1800
Useful Life
Project Name Police Station Roof Repair Category General
New Project: Yes Account Number: 147-1700-541.40-31 Priority n/a
Time-Line: FY18 Status Active
Total Project Cost: $53,100
Description
The Police Department has been experiencing recurring roof leaks over the past several years. Over time, we determined the leaks have to be
coming from the flat roof sections of the building. As a result, we have made several attempts to correct the problems. However, with every windy
rain storm that occurs additional leaks are discovered. It is troublesome to determine where exactly the least are occurring because the water flows
from the roof over the pipes and structure in the attic areas before they drip through to the second-floor office areas. As a result, we consulted with
Mike Hamlett, the city facilities maintenance section chief and he suggested that we obtain an estimate from a contractor to provide a foam seal
coat over all of the flat areas of the roof.
As a result, I contacted Bel Air Roofing in the Baltimore, Maryland area since they have done a lot of similar work for Dover AFB. The estimate
includes 40 mil & 20 year warranty on all three sections of our flat roof. It also includes additional 15% pricing for contingencies.
Justification
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 53,100 53,100
Total 53,100 53,100
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Capital Asset Reserve 53,100 53,100
Total 53,100 53,100
Budget Impact/Other
Friday, May 12, 2017
138
Page 144
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Police
City of Dover, Delaware Contact Police Chief
Type Unassigned
Project # PD1801
Useful Life 20 years
Project Name Police Station Impound Lot Category General
New Project: Account Number: Priority n/a
Time-Line: Status Active
Total Project Cost: $51,000
Description
Originally 120,000. Transferred 51,000 to PD1800.
Justification
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 51,000 51,000
Total 51,000 51,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Capital Asset Reserve 51,000 51,000
Total 51,000 51,000
Budget Impact/Other
Friday, May 12, 2017
139
Page 145
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Police
City of Dover, Delaware Contact Capt Stump
Type Technology
Project # PD1900
Useful Life 5 years
Project Name Server Consolidation Category Information Technology
New Project: Yes Account Number: 147-1700-541.40-26 Priority 1
Time-Line: FY18-FY19 Status Active
Total Project Cost: $66,000
Description
The Police Department regular server hardware currently consists of 9 physical server computers, with one of them serving as a virtualized host of
3 virtualized servers, totaling 11 windows server environments. This number is dynamic as the need for separate servers changes every few years.
The cost of an individual server includes both the physical hardware as well as the operating system installed on such servers, and licenses for
clients to connect to each of those operating systems. The idea behind virtualized server environments is to reduce operating costs over time by
purchasing one robust physical server which can handle the virtualized load of operating systems normally housed on individual and less robust
server hardware. The initial cost of the robust virtual host is a fraction of what would be spent in multiple years of physical server costs. This,
combined with a Datacenter Edition of Windows Server allows for unlimited licenses of virtual servers, limited only by the hardware capabilities of
that one robust host. There will be exceptions where a physical machine is required by a vendor or is necessary due to workload (such as SQL
database host), but most environments can be of a virtual type.
Justification
The City’s IT Department is also migrating the rest of the city computer systems to this type of set-up so we would like to follow their example. In
addition, this project will simplify the internal server structure by:
1.Reducing the number of physical servers
2.Reducing costs of operating systems purchased over time
3.Reducing costs of multiple physical server purchases
4.Reducing electrical use of physical servers which in turn reduces electrical costs as well as increasing the run-time on our server battery backup
unit
5.Reducing the amount of heat generated otherwise by multiple physical servers which in turn requires more cooling of server room
6.Reduces the necessary cabling/wiring necessary to control and network multiple servers
7.Allows us to duplicate the virtual machines to a future, identical machine to facilitate redundancy, reducing or eliminating downtime of server
maintenance (FY18)
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 66,000 66,000
Total 66,000 66,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 66,000 66,000
Total 66,000 66,000
Budget Impact/Other
The purchase price above includes a five year warranty period, which is the expected life cycle for these servers. As a result, we would hope to
replace them every five years so there are no expected recurring budget costs for this project. However, it may be possible to extend the life of the
systems, but maintenance costs would be incurred for additional years to keep the systems operational. We do not know what the maintenance cost
would be for that point in time.
Friday, May 12, 2017
140
Page 146
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Police
City of Dover, Delaware Contact Police Chief
Type Improvement
Project # PD1901
Useful Life 20 years
Project Name Evidence Room Asbestos Abatement Category General
New Project: Account Number: Priority n/a
Time-Line: Status Active
Total Project Cost: $20,000
Description
This project integrates with FY18-19 project for the new evidence storage facility. However the following information is provided as background
for this request.
Within the past few years, the Police Department has been experiencing issues with the air quality in the building. As a result, Compliance
Environmental was contracted to perform air quality sampling in the building. Several areas in the building were found to have elevated levels of
mold and other particulates in the air samples. Although the levels present in the samples were not toxic, they were high enough that the experts
recommended recurring samples be taken to monitor the levels to assure the safety of the people working in the building. The mold particles were
found to be much higher in the air handling unit that services the main evidence storage area and the 911 Communications Supervisor’s office.
The problems for this unit were found to be caused by the insufficient air flow present in the main evidence storage room. In addition, it was
discovered that the ventilation for the evidence room, especially for the interior storage room for drugs/narcotics, was not vented properly to
provide negative air flow in these areas. As a result, the odor of the drugs and narcotics stored in this room were being recirculated within the air
handler unit, so other areas of the building were being exposed to the noxious odors.
The air quality study also made several recommendations that would help alleviate the odor issues in the building. The first step was to remove
and dispose of the carpeting in the main evidence room and replace it with hard flooring to reduce the amount of contamination from the air.
Before the carpeting could be removed, Compliance Environmental tested the flooring under the areas where the carpeting was to be removed. A
portion of the main evidence room is located within the boundaries of the original building footprint, so the flooring in that area is much older than
the flooring in other parts of the room which are located in the new section of the building. Samples were taken in all parts of the room and the
testing revealed the presence of asbestos tile under the carpet. Removal of the carpeting in this area will require specialized equipment and process
for removing the asbestos in the room and will also require the removal of all of the evidence property stored in the room, however, the temporary
relocation of evidence to another area in the building is not possible because of the storage security requirements prescribed by police accreditation
standards.
As a result, the timing for this project is requested to coincide with the timing for the construction of the new evidence facility. The cost estimate
for this project was provided by Compliance Environmental.
Justification
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 20,000 20,000
Total 20,000 20,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 20,000 20,000
Total 20,000 20,000
Budget Impact/Other
Friday, May 12, 2017
141
Page 147
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Police
City of Dover, Delaware Contact Police Chief
Type Equipment
Project # PD1902
Useful Life
Project Name Police Station Chiller Replacement Category General
New Project: Account Number: Priority n/a
Time-Line: Status Active
Total Project Cost: $250,000
Description
This project integrates with FY2020 project for the new evidence storage facility. However, the following information is provided as background
for this request.
The Police Impound lot is currently located off-site at a location in Schutte park. Although the lot is fenced in, there have been recurring problems
with break-ins and damage to the vehicles stored in the lot. The lot was originally located on the police station lot adjacent to the location of the
old warehouse, before it was torn down and replaced. When the lot was located on the police station property, there was more visibility of the lot
and the vehicles located there so there were no security issues.
The timing for this project should coincide with the construction of the new evidence facility, so it should happen towards the end of the project or
immediately after its completion.
As a result, the timing for this project is requested to coincide with the timing for the construction of the new evidence facility. The cost for this
facility was calculated using engineering cost estimates used by Dover AFB civil engineers for parking lots; $10/square foot for paved areas plus
$100/linear foot for the fencing which includes outrigging on the fencing.
Justification
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Miscellaneous 250,000 250,000
Total 250,000 250,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 250,000 250,000
Total 250,000 250,000
Budget Impact/Other
Friday, May 12, 2017
142
Page 148
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Police
City of Dover, Delaware Contact Capt Stump
Type Unassigned
Project # PD2003
Useful Life 50 years
Project Name New Evidence Facility Category General
New Project: Yes Account Number: 147-1700-541.40-31 Priority n/a
Time-Line: Status Active
Total Project Cost: $3,000,000
Description
There is currently insufficient space for managing evidence property within the Police Department. As criminal activities increase throughout the
city, additional space is needed to store all the items taken into custody for the increasing workload. In addition, there are several locations
throughout the police station and police warehouse that are currently being used for evidence storage. The main evidence storage facility is located
on the first floor in the center of the police station and it houses the storage of the smaller current evidence articles and also contains another
secured room inside of this area for the storage of illegal drugs.
Within the past few years, the Police Department has been experiencing issues with the air quality in the building. As a result, Compliance
Environmental was contracted to perform air quality sampling in the building. Several areas in the building were found to have elevated levels of
mold and other particulates in the air samples. Although the levels present in the samples were not toxic, they were high enough that the experts
recommended recurring samples be taken to monitor the levels to assure the safety of the people working in the building. The mold particles were
found to be much higher in the air handling unit that services the main evidence storage area and the 911 Communications Supervisor’s office.
The problems for this unit were found to be caused by the insufficient air flow present in the main evidence storage room. In addition, it was
discovered that the ventilation for the evidence room, especially for the interior storage room for drugs/narcotics, was not vented properly to
provide negative air flow in these areas. As a result, the odor of the drugs and narcotics stored in this room were being recirculated within the air
handler unit, so other areas of the building were being exposed to the noxious odors.
As a result, the cost to make all the modifications needed to the existing space most likely prove to be costlier and cause more complications, so
building the new facility would be much easier and more effective.
The cost for this facility was calculated using engineering cost estimates used by Dover AFB civil engineers for vaulted buildings, garage areas and
parking lots. A more defined cost and plans for the building would have to be procured from an engineering/design firm which would be provided
at a significant cost.
Justification
This project will simplify the evidence storage dilemma:
1.Enhance the health and safety of the police station environment by removing the problematic evidence storage area to a separate location.
2.Provide for increased space for efficient storage without temporary relocation of the evidence storage area.
3.Provide the additional evidence storage space that is needed for future expansion.
4.Free up space in the police station for additional manpower and functions that are needed to accommodate the rise in crime.
5.Consolidate all evidence storage in one area to make management of these items easier and more efficient.
6.Adding the new facility could also make the movement of the vehicle impound lot back to an area on the police property more feasible and
efficient since the vehicles in the lot would be observable from the police station, warehouse and new evidence facility.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 3,000,000 3,000,000
Total 3,000,000 3,000,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 3,000,000 3,000,000
Total 3,000,000 3,000,000
Budget Impact/Other
Initial air quality sampling was completed in FY16 ($7,150). Asbestos testing in the main evidence area was completed in early FY17 ($700). The
recheck of air quality in two areas was performed in January 2017 ($1,890) and recurring air quality testing was recommended to be performed
semi-annually. As a result, $2,000 was budgeted for each testing occurrence starting in FY18 at a cost of $4,000/year.
Friday, May 12, 2017
143
Page 149
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST1801
Useful Life 20-25 years
Project Name Street, Concrete and Alley program Category General
New Project: No Account Number: 147-1800-554.40-31 Priority 1
Time-Line: FY18-FY22 Status Active
Total Project Cost: $5,923,000
Description
This project will rehabilitate approximately three to five percent (3-5%) of the street and alley network each year. The estimated capital
maintenance costs are $33.7 million over a 20-year planning horizon in Fiscal Year 2005 dollars. This estimate is based on the needs survey
conducted by Public Services in Fiscal Year 2004. Continuous maintenance on these assets will prevent costlier reconstruction in the future. This
project combines the former Street Resurfacing Program, the Alley Program and the Barrier Free Access Ramp Program. Locations will be
determined by the priority listing and by potential legislator contributions. Additionally, this program replaces and rehabilitates deteriorated
sidewalks and curbs throughout the City using in-house labor and private contractors. This is in accordance with the ADA. Delaying or eliminated
the project will result in continued complaints and insurance claims from citizens and visitors. In addition, further deterioration of the sidewalk
network will occur.
Justification
The program identifies maintenance costs for the 83.01 miles of streets and 15.93 miles of alleys. Replacement of deteriorated curbs, gutters, and
sidewalks provides improved use, drainage, and the appearance of the pavement section. The Street and Alley Program schedule is driven by
funding and road ratings. Total street mileage is growing as more roads and alleys are dedicated for public maintenance due to growth.
Additionally, this program promotes the interconnection of the sidewalk network to conform to ISTEA (Intermodal Surface Transportation
Efficiency Act) and rehabilitates sidewalks that have root damage from City street trees. This program also facilitates compliance with the
Americans with Disabilities Act as it relates to the pedestrian network as well as improving localized drainage issues.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 950,000 1,001,200 1,867,800 936,000 1,168,000 5,923,000
Total 950,000 1,001,200 1,867,800 936,000 1,168,000 5,923,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 950,000 1,001,200 1,867,800 936,000 1,168,000 5,923,000
Total 950,000 1,001,200 1,867,800 936,000 1,168,000 5,923,000
Budget Impact/Other
Friday, May 12, 2017
144
Page 150
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST1802
Useful Life 50-80
Project Name Miscellaneous Emergency Storm Sewer Repairs Category General
New Project: Yes Account Number: 147-1800-554.40-31 Priority 2
Time-Line: FY17-FY21 Status Active
Total Project Cost: $380,000
Description
This project will repair failing storm sewer infrastructure. The work will focus on emergency repair situations on City owned infrastructure. No
specific locations for this work have been identified.
Justification
This project is necessary to address failing or deteriorated infrastructure in the City. If these repairs are not conducted, significant impacts to
property, life and environment could arise. Delaying these repairs could result in road failure, sink holes and environmental impacts.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 70,000 73,000 76,000 79,000 82,000 380,000
Total 70,000 73,000 76,000 79,000 82,000 380,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 70,000 73,000 76,000 79,000 82,000 380,000
Total 70,000 73,000 76,000 79,000 82,000 380,000
Budget Impact/Other
Friday, May 12, 2017
145
Page 151
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST1803
Useful Life 90+ years
Project Name Meeting House Branch Improvements Category General
New Project: No Account Number: 147-1800-554.40-31 Priority 3
Time-Line: FY18-FY20 Status Active
Total Project Cost: $8,220,000
Description
Due to the environmental concerns, the Meeting House Branch site (also known as PWII) will be redeveloped to improve stormwater quality
entering Silver Lake. This project will also decrease the flooding in the area. The site will be converted to a stabilized park with water quality
improvements for stormwater.
Estimates provided by AECOM, Corp., Consulting Engineer.
Justification
Stringent environmental regulations will require improvements on the site. Improved stormwater control will enhance affected area.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 2,740,000 2,740,000 2,740,000 8,220,000
Total 2,740,000 2,740,000 2,740,000 8,220,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 2,740,000 2,740,000 2,740,000 8,220,000
Total 2,740,000 2,740,000 2,740,000 8,220,000
Budget Impact/Other
Friday, May 12, 2017
146
Page 152
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST1804
Useful Life 90+ years
Project Name Redevelopment of Schutte Park Category General
New Project: No Account Number: 147-1800-554.40-31 Priority 4
Time-Line: FY18-FY19 Status Active
Total Project Cost: $1,800,000
Description
In conjunction with the PW 2 site improvements, operations will be relocated to Schutte Park. The improvements include relocating the
greenhouse, grounds office, equipment garage (including small engine repair).
Estimates provided by AECOM, Corp., Consulting Engineer.
Justification
Relocation of existing city facility to Schutte Park will create a centralized location for divisions and increase operational efficiency.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 1,800,000 1,800,000
Total 1,800,000 1,800,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 1,800,000 1,800,000
Total 1,800,000 1,800,000
Budget Impact/Other
Friday, May 12, 2017
147
Page 153
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST1805
Useful Life 50 years
Project Name Dover Library Conveyance System Improvements Category General
New Project: Yes Account Number: 147-1800-554.40-31 Priority 4
Time-Line: FY18-FY19 Status Active
Total Project Cost: $250,000
Description
This project, identified by staff, will upgrade the existing stormwater infrastructure that begins in the northeast corner of the Dover Public Library
parking lot and travels due east to mirror lake and eventually St. Jones River.
Justification
This will provide improved capacity and conveyance of stormwater from the City owned parking lot. Failure to improve this system will result in
continued flooding in the area.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 50,000 50,000
Construction/Maintenance 200,000 200,000
Total 50,000 200,000 250,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 50,000 200,000 250,000
Total 50,000 200,000 250,000
Budget Impact/Other
Friday, May 12, 2017
148
Page 154
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST1906
Useful Life 50 years
Project Name Water Street Flooding Improvements Category General
New Project: Yes Account Number: 147-1800-554.40-31 Priority 6 --
Time-Line: FY19-FY20 Status Active
Total Project Cost: $150,000
Description
This project, identified by staff, will upgrade the existing stormwater infrastructure that is in Water Street, near the intersection of Governors
Avenue. This area consistently floods with a moderate rain event in the City.
Justification
This will provide improved capacity and conveyance of stormwater from this intersection. Failure to improve this system will result in continued
flooding in the area.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 50,000 50,000
Construction/Maintenance 100,000 100,000
Total 50,000 100,000 150,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 50,000 100,000 150,000
Total 50,000 100,000 150,000
Budget Impact/Other
Friday, May 12, 2017
149
Page 155
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST1907
Useful Life 50 years
Project Name Brine Manufacturing System Category General
New Project: Yes Account Number: 147-1800-554.40-31 Priority 6 --
Time-Line: FY18 Status Active
Total Project Cost: $45,000
Description
This project, identified by staff, will convert dry rock salt into liquid for pre-wetting or anti-icing roadways prior to inclement weather. The use of
brine salt lowers the freezing point of snow and ice. The location of this system will be at Schutte Park.
Justification
This will provide a cost effective way to pre-treat the City of Dover roadways to enhance safety during snow and ice events.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 45,000 45,000
Total 45,000 45,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 45,000 45,000
Total 45,000 45,000
Budget Impact/Other
Friday, May 12, 2017
150
Page 156
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST2005
Useful Life 50 years
Project Name The Greens of Dover/Lamplighter Ln Strmwtr Impr Category General
New Project: Yes Account Number: 147-1800-554.40-31 Priority 6 --
Time-Line: FY20-FY21 Status Active
Total Project Cost: $200,000
Description
This project, identified by staff, will upgrade the existing stormwater infrastructure that is behind Lamplighter Lane, near the Greens of Dover. The
existing forty-two inch (42”) stormwater pipe has a temporary repair to handle the stormwater.
Justification
This will provide improved capacity and conveyance of stormwater from this area. Failure to improve this system will result in a future failure of
the infrastructure and property damage.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 50,000 50,000
Construction/Maintenance 150,000 150,000
Total 50,000 150,000 200,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
General Fund 50,000 150,000 200,000
Total 50,000 150,000 200,000
Budget Impact/Other
Friday, May 12, 2017
151
Page 157
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Public Works - Streets
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # ST2104
Useful Life 50 years
Project Name Reed Street Flooding Improvements Category General
New Project: Yes Account Number: 147-1800-554.40-31 Priority 4
Time-Line: FY21-FY22 Status Active
Total Project Cost: $150,000
Description
This project, identified by staff, will upgrade the existing stormwater infrastructure that is within Reed Street, near the intersection of Bradford
Street. The current infrastructure is undersized.
Justification
This will provide improved capacity and conveyance of stormwater from this street. Failure to improve this system will result in continued
flooding in the area.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total Future
Planning/Design 50,000 50,000 100,000
Total 50,000 50,000 Total
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total Future
General Fund 50,000 50,000 100,000
Total 50,000 50,000 Total
Budget Impact/Other
Friday, May 12, 2017
152
Page 159
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
FUNDING SOURCE SUMMARY
Source FY 18 FY 19 FY 20 FY 21 FY 22 Total
DE Sewer Revolving Loan Fund 250,000 250,000
Impact Fee Reserve 555,200 52,800 27,600 460,000 1,095,600
Water/Wastewater Fund 2,895,100 4,708,800 4,859,000 2,732,600 5,126,000 20,321,500
GRAND TOTAL 2,895,100 5,514,000 4,911,800 2,760,200 5,586,000 21,667,100
Wednesday, May 03, 2017
154
Page 160
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
PROJECTS BY DEPARTMENT
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
Wastewater Management
Meter Replacement Project WW1800 n/a 216,100 229,000 229,000 229,000 229,000 1,132,100
Inflow/Infiltration Removal WW1801 1 1,071,900 651,000 888,900 832,100 861,000 4,304,900
Miscellaneous Emergency Sanitary Sewer Repairs WW1802 2 100,000 155,000 160,000 165,000 170,000 750,000
SCADA Equipment Technology Upgrade WW1803 3 35,000 36,000 37,000 38,000 39,000 185,000
Puncheon Run Pump Station Improvements WW1805 6 70,000 250,000 320,000
Delaware Tech Pump Station Replacement WW1900 5 450,000 450,000
Tar Ditch Interceptor WW1901 7 250,000 250,000
Silver Lake Pump Station Replacement WW1902 5 462,000 462,000
Walker Woods Pump Station Replacement WW1903 4 476,000 476,000
College Road Pump Station Replacement WW2000 5 65,000 570,000 635,000
Turnberry Pump Station Replacement WW2001 5 67,000 580,000 647,000
Heatherfield Pump Station Replacement WW2100 5 69,000 69,000
Lepore Road Sanitary Sewer Upgrade WW2206 6 33,100 33,100
Wastewater Management Total 1,493,000 2,959,000 1,446,900 1,333,100 2,482,100 9,714,100
Water Management
Meter Replacement Program WD1800 n/a 216,100 222,500 229,200 236,100 243,400 1,147,300
Wellhead Redevelopment Program WD1801 1 55,000 90,000 92,500 95,000 97,500 430,000
Futrure Well Installation WD1901 5 635,000 635,000 1,270,000
Denneys Road 1.0 MG Elevated Water Storage Tank WD2005 5 84,000 1,495,000 1,579,000
Water Quality Improvements WQ1801 2 425,000 425,000
Water Quality Improvements WQ1802 2 621,000 219,500 863,200 1,002,000 1,171,000 3,876,700
Miscellaneous Emergency Water Repairs WQ1803 3 85,000 88,000 91,000 94,000 97,000 455,000
Water Management Total 1,402,100 1,255,000 1,994,900 1,427,100 3,103,900 9,183,000
Water Treatment Plant
Water Treatment Plant Process Improvements WD1902 4 1,300,000 1,470,000 2,770,000
Water Treatment Plant Total 1,300,000 1,470,000 2,770,000
GRAND TOTAL 2,895,100 5,514,000 4,911,800 2,760,200 5,586,000 21,667,100
Wednesday, May 03, 2017
155
Page 161
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1800
Useful Life 20 years
Project Name Meter Replacement Project Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-25 Priority n/a
Time-Line: FY18-FY22 Status Active
Total Project Cost: $1,132,100
Description
This project will be an ongoing project to replace our aged water meters in the system. A portion of water meters will be replaced each year. A
majority of the water meters have exceeded their life expectancy of 15-20 years. The industry standard is to replace 20% of the meter inventory for
five years. The City will benefit from this project by having a more efficient system which will recover maximum revenue to the water utility.
Additionally, expenses of maintaining, stocking and operating the out dated meters are greatly reduced.
Justification
This project will provide the City of Dover with accurate readings of our water users, thus creating accurate revenue from the customers. Delaying
or eliminating this project would result in the age of the water meters increasing, and consequently the meters will not read the correct volume of
water being consumed. Additionally, older water meters typically require more maintenance.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 216,100 229,000 229,000 229,000 229,000 1,132,100
Total 216,100 229,000 229,000 229,000 229,000 1,132,100
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 216,100 229,000 229,000 229,000 229,000 1,132,100
Total 216,100 229,000 229,000 229,000 229,000 1,132,100
Budget Impact/Other
Wednesday, May 03, 2017
156
Page 162
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1801
Useful Life 50-80
Project Name Inflow/Infiltration Removal Category Water/Wastewater
New Project: No Account Number: 417-6900-569.40-31 Priority 1
Time-Line: FY18-FY22 Status Active
Total Project Cost: $4,304,900
Description
This project identifies and corrects areas in the sanitary sewer collection system that are deteriorating and allowing groundwater to enter the
sanitary sewer system through cracked pipes and/or joints. Video investigations of the lines are performed by in-house crews to determine the
condition of subject pipes which may also help with the identification of sump pumps and other illicit connections to the system which will have to
be removed by individual property owners. Investigations are occurring systematically through the sewer basins to establish projects for the
following year. Sanitary sewer lines are also being inspected in conjunction with water quality improvement project areas to determine main
condition. Smoke testing, pipe relining and or replacement are to occur each year. The wet weather which was experienced in both 2003 and
2009/2010/2011, exemplified the fact that the aging and deteriorating sanitary sewer system allows groundwater and rain water to enter the
system. This in turn results in higher treatment charges from Kent County. In FY 2011 a new groundwater inflow adjustment charge was
established as a result. It is critical to continue making improvements on a regular and planned basis to improve the integrity of the wastewater
system. Weather occurs in a cyclical fashion and discrepancies between fees collected and charges received will likely happen again when
groundwater and precipitation levels rise. FY 17 projects include continuation of rehabilitating the White Oak Farms Basin #5, North State Street
Repair and South State Street Repair. FY 18 projects include: approximately 20,700 linear feet of root control throughout the City, various pipe
relining in various areas of the City and continuation of White Oak Farms Basin #5.
Justification
The wet weather experienced in both 2003 and 2009/2010/2011, highlighted the fact that we have an aging wastewater system that requires more
attention to the condition of the old pipe network and more monitoring of illicit connections to the system. Inflow and infiltration are problems that
all customers pay for since they are costs that are not assigned to an individual customer. Therefore, all customers are affected by expenses related
to inflow and infiltration. Delaying or eliminating this project will result in continued higher treatment charges for wastewater flow to Kent
County than is necessary. In addition, the reduction in available capacity in the City and county systems due to inflow and infiltration will reduce
the capacity available for future growth.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 1,071,900 651,000 888,900 832,100 861,000 4,304,900
Total 1,071,900 651,000 888,900 832,100 861,000 4,304,900
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 1,071,900 651,000 888,900 832,100 861,000 4,304,900
Total 1,071,900 651,000 888,900 832,100 861,000 4,304,900
Budget Impact/Other
Wednesday, May 03, 2017
157
Page 163
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1802
Useful Life 50-80
Project Name Miscellaneous Emergency Sanitary Sewer Repairs Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-31 Priority 2
Time-Line: FY18-FY22 Status Active
Total Project Cost: $750,000
Description
This project will repair failing sanitary sewer infrastructure. The work will focus on emergency repair situations on City owned infrastructure. No
specific locations for this work have been identified.
Justification
This project is necessary to address failing or deteriorated infrastructure in the City. If these repairs are not conducted, significant impacts to
property, life and environment could arise. Delaying these repairs could result in road failure, sink holes and environmental contamination.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 100,000 155,000 160,000 165,000 170,000 750,000
Total 100,000 155,000 160,000 165,000 170,000 750,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 100,000 155,000 160,000 165,000 170,000 750,000
Total 100,000 155,000 160,000 165,000 170,000 750,000
Budget Impact/Other
Wednesday, May 03, 2017
158
Page 164
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1803
Useful Life 10 years
Project Name SCADA Equipment Technology Upgrade Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-25 Priority 3
Time-Line: FY18-FY22 Status Active
Total Project Cost: $185,000
Description
This project involves the replacement of antiquated and / or obsolete remote terminal units (RTU’s) at wastewater pump stations with new up-to-
date SCADA equipment. A new module will be installed at each station. This module will be utilized as the reporting equipment that will report
real time data that depicts the status of alarms at the City’s stations. The new module will utilize cellular service to transit all information through a
web based program, which will allow multiple City personnel to access the information remotely. The City will replace six existing RTU’s per
year until the entire inventory of pump stations have been replaced.
Justification
Replace failing and antiquated equipment with completely new alarm reporting equipment to provide reliable SCADA system reporting to prevent
the need for costly non-budgeted emergency repairs. Additionally, the current RTU maintenance contract will be retiring soon, putting the City at
risk of securing a costly contract to provide repairs.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 35,000 36,000 37,000 38,000 39,000 185,000
Total 35,000 36,000 37,000 38,000 39,000 185,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 35,000 36,000 37,000 38,000 39,000 185,000
Total 35,000 36,000 37,000 38,000 39,000 185,000
Budget Impact/Other
Wednesday, May 03, 2017
159
Page 165
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1805
Useful Life 20 years
Project Name Puncheon Run Pump Station Improvements Category Water/Wastewater
New Project: No Account Number: 417-6900-569.40-31 Priority 6 --
Time-Line: FY18-FY19 Status Active
Total Project Cost: $320,000
Description
This project, identified by staff, will replace a failing grit removal system that is located within the Puncheon Run Pump Statoin. The existing
infrastructure is failing and is need of upgrades. Estimates provided by JMT, Consulting Engineer.
Justification
Delaying these upgrades will reduce the efficiently of the pump station mentioned above, additionally, operational costs will continue to increase
for the above mentioned pump stations.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 70,000 70,000
Construction/Maintenance 250,000 250,000
Total 70,000 250,000 320,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 70,000 250,000 320,000
Total 70,000 250,000 320,000
Budget Impact/Other
Wednesday, May 03, 2017
160
Page 166
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1900
Useful Life 20-25 years
Project Name Delaware Tech Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: 417-6900-569.40-31 Priority 5
Time-Line: FY18 Status Active
Total Project Cost: $450,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1975 in order to handle the increased flows from
the area. The station has exceeded its life anticipated expectancy of 20-25 years and is in need of a capacity upgrade due to anticipated increase
flow. Estimates provided by JMT, Consulting Engineer
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation, thus reducing pump
failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable, and
replacement of equipment is costly. Design in Fiscal 2018; construction in Fiscal 2019
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 450,000 450,000
Total 450,000 450,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Impact Fee Reserve 180,000 180,000
Water/Wastewater Fund 270,000 270,000
Total 450,000 450,000
Budget Impact/Other
Wednesday, May 03, 2017
161
Page 167
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # WW1901
Useful Life 20-25 years
Project Name Tar Ditch Interceptor Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-31 Priority 7 --
Time-Line: FY18 Status Active
Total Project Cost: $250,000
Description
This project, identified in the 2009 Wastewater Master Plan, requires approximately 300 linear feet of fifteen (15”) gravity sanitary sewer
replacement. It has been identified that the subject pipe is flowing with a reverse slope, which can cause a surcharge during peak flow periods.
Estimates provided by AECOM, Corp., Consulting Engineer.
Justification
Delaying this project will result in preventing growth, as well as environmental issues with sewage surcharging onto the ground. Additionally, not
addressing this issue could result in sewage backups to residences. Construction in Fiscal 2019.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 250,000 250,000
Total 250,000 250,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
DE Sewer Revolving Loan 250,000 250,000
Fund
Total 250,000 250,000
Budget Impact/Other
The construction phase of this project has a potential to be funded by a Clean Water State Revolving Fund Loan.
Wednesday, May 03, 2017
162
Page 168
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1902
Useful Life 20-25 years
Project Name Silver Lake Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: 417-6900-569.40-31 Priority 5
Time-Line: FY17-FY19 Status Active
Total Project Cost: $462,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1982 in order to handle development in the area,
as well as completely rehabilitate the wet well side of the pump station using a poly-triplex system liner. The station has exceeded its life
expectancy of 20-25 years and is in need of a capacity upgrade to handle anticipated growth in the basin. Estimates provided by JMT, Consulting
Engineer.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation, thus reducing pump
failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable and
replacement of equipment is costly. Design in Fiscal 2017; construction in Fiscal 2019.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 462,000 462,000
Total 462,000 462,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Impact Fee Reserve 184,800 184,800
Water/Wastewater Fund 277,200 277,200
Total 462,000 462,000
Budget Impact/Other
Wednesday, May 03, 2017
163
Page 169
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW1903
Useful Life 20-25 years
Project Name Walker Woods Pump Station Replacement Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-31 Priority 4
Time-Line: FY20 Status Active
Total Project Cost: $476,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1989 in order to handle development in the area,
as well as completely rehabilitate the wet well side of the pump station using a poly-triplex system liner. The station has exceeded its life
expectancy of 20-25 years and is in need of a capacity upgrade to handle anticipated growth in the basin. Estimates provided by JMT, Consulting
Engineer.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation, thus reducing pump
failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable and
replacement of equipment is costly. Design in Fiscal 2017; construction in Fiscal 2020.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 476,000 476,000
Total 476,000 476,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Impact Fee Reserve 190,400 190,400
Water/Wastewater Fund 285,600 285,600
Total 476,000 476,000
Budget Impact/Other
Wednesday, May 03, 2017
164
Page 170
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW2000
Useful Life 20-25 years
Project Name College Road Pump Station Replacement Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-31 Priority 5
Time-Line: FY20-FY21 Status Active
Total Project Cost: $635,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1987 in order to handle development in the area,
as well as completely rehabilitate the wet well side of the pump station using a poly-triplex system liner. The station has exceeded its life
expectancy of 20-25 years and is in need of a capacity upgrade to handle anticipated growth in the basin. Estimates provided by Pennoni
Associates,Consulting.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation. Pump failure
resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable and
replacement of equipment is costly. Design and bid in Fiscal 2020; construction in Fiscal 2021.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 65,000 570,000 635,000
Total 65,000 570,000 635,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Impact Fee Reserve 26,000 228,000 254,000
Water/Wastewater Fund 39,000 342,000 381,000
Total 65,000 570,000 635,000
Budget Impact/Other
Wednesday, May 03, 2017
165
Page 171
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW2001
Useful Life 20-25 years
Project Name Turnberry Pump Station Replacement Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-31 Priority 5
Time-Line: FY21-FY22 Status Active
Total Project Cost: $647,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1989 in order to handle development in the area,
as well as completely rehabilitate the wet well side of the pump station using a poly-triplex system liner. The station has exceeded its life
expectancy of 20-25 years and is in need of a capacity upgrade to handle anticipated growth in the basin. Estimates provided by Pennoni
Associates, Consulting.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation, thus reducing pump
failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable and
replacement of equipment is costly. Design and bid in Fiscal 2021; construction in Fiscal 2022.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 67,000 580,000 647,000
Total 67,000 580,000 647,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Impact Fee Reserve 26,800 232,000 258,800
Water/Wastewater Fund 40,200 348,000 388,200
Total 67,000 580,000 647,000
Budget Impact/Other
Wednesday, May 03, 2017
166
Page 172
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW2100
Useful Life 20-25 years
Project Name Heatherfield Pump Station Replacement Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-31 Priority 5
Time-Line: FY22 Status Active
Total Project Cost: $69,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1985 in order to handle development in the area,
as well as completely rehabilitate the wet well side of the pump station using a poly-triplex system liner. The station has exceeded its life
expectancy of 20-25 years and is in need of a capacity upgrade to handle anticipated growth in the basin. Estimates provided by Pennoni
Assovciates, Consulting.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation, thus reducing pump
failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable and
replacement of equipment is costly. Design and bid in Fiscal 2022; construction in Fiscal 2026.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 69,000 69,000
Total 69,000 69,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Impact Fee Reserve 27,600 27,600
Water/Wastewater Fund 41,400 41,400
Total 69,000 69,000
Budget Impact/Other
Wednesday, May 03, 2017
167
Page 173
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Wastewater Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WW2206
Useful Life 90+ years
Project Name Lepore Road Sanitary Sewer Upgrade Category Water/Wastewater
New Project: Yes Account Number: 417-6900-569.40-31 Priority 6 --
Time-Line: FY22 Status Active
Total Project Cost: $33,100
Description
This project calls for the replacement of approximately 374 linear feet of 8-inch gravity sewer main. Currently, the sewer main operates in a
reverse slope condition, which overloads the pipe. The proposed upgrade will provide slope and adequate capacity for current flow to be carried to
discharge. Estimates provided by Pennoni Associates, Consulting Engineer.
Justification
This project will allow for proper capacity and slope to handle the current flow. Delaying or eliminating this project could result in overflow of
wastewater material. Design in FY 2022; construction will be scheduled for FY 2024.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 33,100 33,100
Total 33,100 33,100
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 33,100 33,100
Total 33,100 33,100
Budget Impact/Other
The construction phase of this project has a potential to be funded by a Clean Water State Revolving Fund Loan.
Wednesday, May 03, 2017
168
Page 174
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WD1800
Useful Life 20 years
Project Name Meter Replacement Program Category Water/Wastewater
New Project: Yes Account Number: 417-6800-568.40-25 Priority n/a
Time-Line: FY18-FY22 Status Active
Total Project Cost: $1,147,300
Description
This project will be an ongoing project to replace our aged water meters in the system. A portion of water meters will be replaced each year. A
majority of the water meters have exceeded their life expectancy of 15-20 years. The industry standard is to replace 20% of the meter inventory for
five years. The City will benefit from this project by having a more efficient system which will recover maximum revenue to the water utility.
Additionally, expenses of maintaining, stocking and operating the out dated meters are greatly reduced.
Justification
This project will provide the City of Dover with accurate readings of our water users, thus creating accurate revenue from the customers. Delaying
or eliminating this project would result in the age of the water meters increasing, and consequently the meters will not read the correct volume of
water being consumed. Additionally, older water meters typically require more maintenance.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 216,100 222,500 229,200 236,100 243,400 1,147,300
Total 216,100 222,500 229,200 236,100 243,400 1,147,300
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 216,100 222,500 229,200 236,100 243,400 1,147,300
Total 216,100 222,500 229,200 236,100 243,400 1,147,300
Budget Impact/Other
Over time, the capabilities of a water meter to read accurate volumes of water deteriorates, typically registering less water than actually being
consumed. With installation of new meters, accurate readings will increase the actual revenue from this utility.
Wednesday, May 03, 2017
169
Page 175
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WD1801
Useful Life 20-25 years
Project Name Wellhead Redevelopment Program Category Water/Wastewater
New Project: No Account Number: 417-6800-568.40-31 Priority 1
Time-Line: FY18-FY22 Status Active
Total Project Cost: $430,000
Description
This project will provide for rehabilitation and repair of each deep wellhead in an effort to maintain operations and/or increase/maintain the yield
of each well as it relates to the permitted allocation. FY 2008; total well inspection and testing performed. FY 2009: Motors at Wells #6A and #9
were rebuilt, and wells #13R and #15 were redeveloped. FY 2010: Well #10. FY 2011: Well #4 redevelopment and well piping improvements at
various well locations, as well as continued well testing. FY 2012: Well #1 redevelopment. FY2013: complete repair of Well #10. FY2014:
complete repair of well #14. FY2015 inspected: 2, 3, 11, 13R, 15, PW2 & PW4B. FY 2016 inspected: 4, 6, 8R, 9, 10, PW6A & PW8A. FY
2017 scheduled to be inspected: 1, 10 & 4B. FY 2018 tentative schedule: 7, PW6A, 14, PW5.
Justification
The well screening and gravel pack requires cleaning over time due to a buildup of mineral deposits and foreign materials such as clay and silt.
This maintenance effort is critical to ensure that production can continue to meet demand. It is also necessary to maintain the operational aspects of
each well and provide repairs as needed to minimize downtime to maintain system capacity. Delaying or eliminating this project would result in
the continued deterioration of the well screen, gravel pack, and well yield over time. It would also result in increased well downtime, emergency
repairs, and decreased capacity. These issues can lead to increased flow pattern changes and water quality concerns.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 55,000 90,000 92,500 95,000 97,500 430,000
Total 55,000 90,000 92,500 95,000 97,500 430,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 55,000 90,000 92,500 95,000 97,500 430,000
Total 55,000 90,000 92,500 95,000 97,500 430,000
Budget Impact/Other
Wednesday, May 03, 2017
170
Page 176
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WD1901
Useful Life 100
Project Name Futrure Well Installation Category Water/Wastewater
New Project: Yes Account Number: 417-6800-568.40-31 Priority 5
Time-Line: FY19-FY20 Status Active
Total Project Cost: $1,270,000
Description
The proposed project, identified by staff will drill a new well to increase production capacity for the water distribution system. Estimates provided
by AECOM Corp., Consulting Engineer.
Justification
To meet increased water demand and fire suppression requirements. Delaying or eliminating this project would result in the continued reduction in
our production capabilities under our permitted allocation, as well as limiting the City’s growth. Initial planning was conducted in FY16, design
scheduled for FY17 and construction in both FY19 and FY20.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 635,000 635,000 1,270,000
Total 635,000 635,000 1,270,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 635,000 635,000 1,270,000
Total 635,000 635,000 1,270,000
Budget Impact/Other
Electrical costs will increase in the Operations Budget
Wednesday, May 03, 2017
171
Page 177
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WD2005
Useful Life 100
Project Name Denneys Road 1.0 MG Elevated Water Storage Tank Category Water/Wastewater
New Project: Yes Account Number: 417-6800-568.40-31 Priority 5
Time-Line: FY20, FY22-FY23 Status Active
Total Project Cost: $3,074,000
Description
The proposed project, identified by staff and confirmed by the 2004 Water Master Plan Update, will construct a new 1.0 million gallon elevated
storage tank within the distribution system. The City has a pending memorandum of understanding with the property owners of Stonebrook East to
construct the tank on their property.
Justification
This project was determined necessary by the 2004 Water Mater Plan update in order to meet future storage volume requirements based upon
demands and to aid in reducing low pressure areas and enhance fire suppression capability. The design and land purchase is scheduled for FY20
and construction is scheduled to begin in FY22 and conclude in FY23.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total Future
Planning/Design 50,000 50,000 1,495,000
Land Acquisition 34,000 34,000
Total
Construction/Maintenance 1,495,000 1,495,000
Total 84,000 1,495,000 1,579,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total Future
Water/Wastewater Fund 84,000 1,495,000 1,579,000 1,495,000
Total 84,000 1,495,000 1,579,000 Total
Budget Impact/Other
Electrical costs will increase in the Operations Budget
Wednesday, May 03, 2017
172
Page 178
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WQ1801
Useful Life 90+ years
Project Name Water Quality Improvements Category Water/Wastewater
New Project: No Account Number: 417-6800-568.40-31 Priority 2
Time-Line: FY18-FY22 Status Active
Total Project Cost: $425,000
Description
This project was first identified by staff and the 2006 Water Master Plan Update, and has since become further refined with the FY 2006 Water
Quality Evaluation. Projects to be included under this category primarily consist of replacement or relining of old unlined cast iron water main
within the City’s water distribution system; system upgrades to improve system control; and utilization of a consultant to provide additional design
and evaluation services, as needed. Recent research and data collection has produced a Water Main Rehabilitation Priority List, based on several
criteria to identify water mains that are in need of replacement or relining. Pipes will be upgraded according to the severity of the pipe condition,
as well as coordination with the City of Dover’s Public Services Street Rehabilitation Program. Between FY 2008 and FY 2010, the deep well
contact chambers were designed and installed. Between FY 2008 and FY 2011 the water mains that were replaced include, Washington Street,
Pennsylvania Avenue, South Street, Pear Street, West Street, Hazel Road, Maryland Avenue, American Avenue, Bayard Avenue, Greenhill
Avenue, Bayard Avenue Alley and Loockerman Street. Operational efforts, such as flushing, will continue to occur on a routine basis. FY 2012
improvements include, N. Pennsylvania Ave., American Ave. Ext., Madison St., Rodney Rd., New Street, Ross Street and Bradford Street (near
Wesley College). FY 2013 improvements included North Street. As part of the Water Main Rehabilitation Priority List, water lines were
identified throughout the City that requires replacement/relining. FY 2017 planned roads include: New Street (Water St. to Loockerman),
Bradford Street (Loockerman St. to Division St.) and William Street (Pear St. to State St.). FY 2018 scheduled roads are the following:
-WQ1801 - Bradford Street (Loockerman Street to Division Street) - $425,000
-WQ1802 - William Street (Pear Street to State Street) - $621,000
Justification
Water quality complaints have eroded consumer confidence in the City’s water supply as the water is perceived to be aesthetically unpleasant. In
order to reduce complaints and potentially alleviate this problem, it is necessary to implement the improvements identified by staff, the 2006 Water
Master Plan Update, and the FY 2006 Water Quality Evaluation. Delaying or eliminating this project will prolong customer dissatisfaction and
further erode confidence in the City’s water supply. In addition, main rehabilitation and replacement, ensuring pipes do not significantly exceed
the expected life cycle, is critical to provide a reliable supply of water for our customers and for fire suppression. Water leaks and breaks on older
lines can have a significant impact on our ability to serve over time. Addressing the brown water and associated water quality concerns of the
City’s water system will not only require capital improvements to the system but also operational changes. Some operation changes will result in
no net effect on the operating budget, while others will need to be addressed in the development of future operating budgets. Such items include
tools and supplies necessary to improve system sampling and monitoring as well as tools and supplies necessary to improve system-wide flushing
operations.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Miscellaneous 425,000 425,000
Total 425,000 425,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 425,000 425,000
Total 425,000 425,000
Budget Impact/Other
Wednesday, May 03, 2017
173
Page 179
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WQ1802
Useful Life 90+ years
Project Name Water Quality Improvements Category Water/Wastewater
New Project: No Account Number: 417-6800-568.40-31 Priority 2
Time-Line: FY18-FY22 Status Active
Total Project Cost: $3,876,700
Description
This project was first identified by staff and the 2006 Water Master Plan Update, and has since become further refined with the FY 2006 Water
Quality Evaluation. Projects to be included under this category primarily consist of replacement or relining of old unlined cast iron water main
within the City’s water distribution system; system upgrades to improve system control; and utilization of a consultant to provide additional design
and evaluation services, as needed. Recent research and data collection has produced a Water Main Rehabilitation Priority List, based on several
criteria to identify water mains that are in need of replacement or relining. Pipes will be upgraded according to the severity of the pipe condition,
as well as coordination with the City of Dover’s Public Services Street Rehabilitation Program. Between FY 2008 and FY 2010, the deep well
contact chambers were designed and installed. Between FY 2008 and FY 2011 the water mains that were replaced include, Washington Street,
Pennsylvania Avenue, South Street, Pear Street, West Street, Hazel Road, Maryland Avenue, American Avenue, Bayard Avenue, Greenhill
Avenue, Bayard Avenue Alley and Loockerman Street. Operational efforts, such as flushing, will continue to occur on a routine basis. FY 2012
improvements include, N. Pennsylvania Ave., American Ave. Ext., Madison St., Rodney Rd., New Street, Ross Street and Bradford Street (near
Wesley College). FY 2013 improvements included North Street. As part of the Water Main Rehabilitation Priority List, water lines were
identified throughout the City that requires replacement/relining. FY 2017 planned roads include: New Street (Water St. to Loockerman),
Bradford Street (Loockerman St. to Division St.) and William Street (Pear St. to State St.). FY 2018 scheduled road is North State Street and
portions of West Street West Alley (Walker Road to William Street).
-WQ1801 - Bradford Street (Loockerman Street to Division Street) - $425,000
-WQ1802 - William Street (Pear Street to State Street) - $621,000
Justification
Water quality complaints have eroded consumer confidence in the City’s water supply as the water is perceived to be aesthetically unpleasant. In
order to reduce complaints and potentially alleviate this problem, it is necessary to implement the improvements identified by staff, the 2006 Water
Master Plan Update, and the FY 2006 Water Quality Evaluation. Delaying or eliminating this project will prolong customer dissatisfaction and
further erode confidence in the City’s water supply. In addition, main rehabilitation and replacement, ensuring pipes do not significantly exceed
the expected life cycle, is critical to provide a reliable supply of water for our customers and for fire suppression. Water leaks and breaks on older
lines can have a significant impact on our ability to serve over time. Addressing the brown water and associated water quality concerns of the
City’s water system will not only require capital improvements to the system but also operational changes. Some operation changes will result in
no net effect on the operating budget, while others will need to be addressed in the development of future operating budgets. Such items include
tools and supplies necessary to improve system sampling and monitoring as well as tools and supplies necessary to improve system-wide flushing
operations.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Miscellaneous 621,000 219,500 863,200 1,002,000 1,171,000 3,876,700
Total 621,000 219,500 863,200 1,002,000 1,171,000 3,876,700
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 621,000 219,500 863,200 1,002,000 1,171,000 3,876,700
Total 621,000 219,500 863,200 1,002,000 1,171,000 3,876,700
Budget Impact/Other
Wednesday, May 03, 2017
174
Page 180
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Management
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # WQ1803
Useful Life 50-80
Project Name Miscellaneous Emergency Water Repairs Category Water/Wastewater
New Project: Yes Account Number: 417-6800-568.40-31 Priority 3
Time-Line: FY18-FY22 Status Active
Total Project Cost: $455,000
Description
This project will repair failing water infrastructure. The work will focus on emergency repair situations on City owned infrastructure. No specific
locations for this work have been identified.
Justification
This project is necessary to address failing or deteriorated infrastructure in the City. If these repairs are not conducted, significant impacts to
property, life and environment could arise. Delaying these repairs could result in road failure, sink holes and environmental impacts.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 85,000 88,000 91,000 94,000 97,000 455,000
Total 85,000 88,000 91,000 94,000 97,000 455,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 85,000 88,000 91,000 94,000 97,000 455,000
Total 85,000 88,000 91,000 94,000 97,000 455,000
Budget Impact/Other
Wednesday, May 03, 2017
175
Page 181
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Water Treatment Plant
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # WD1902
Useful Life 20-25 years
Project Name Water Treatment Plant Process Improvements Category Water/Wastewater
New Project: Yes Account Number: 417-7600-576.40-31 Priority 4
Time-Line: FY18 Status Active
Total Project Cost: $2,770,000
Description
This project, identified in the 2006 Water Master Plan Update, proposes process improvements to the existing Water Treatment Plant. Due to
limitations with the Ozone Contactors, the capacity at the Water Treatment Plant is not producing 5.0 million gallons per day, as originally
designed. A consultant was secured to determine the best means and improvements necessary to rehabilitate the infrastructure. The design of the
improvements will change the treatment system and have an output of 3.0 million gallons per day; construction to begin in Fiscal Year 2018 and
scheduled to complete in Fiscal Year 2019.
Estimates provided by AECOM, Corp., Consulting Engineer.
Justification
This project is necessary to address failing or deteriorated infrastructure in the City. If these repairs are not conducted, significant impacts to
property, life and environment could arise. Delaying these repairs could result in road failure, sink holes and environmental impacts.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 1,300,000 1,470,000 2,770,000
Total 1,300,000 1,470,000 2,770,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 1,300,000 1,470,000 2,770,000
Total 1,300,000 1,470,000 2,770,000
Budget Impact/Other
The construction phase of this project has a potential to be funded by a Drinking Water State Revolving Fund Loan.
Wednesday, May 03, 2017
176
Page 183
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
FUNDING SOURCE SUMMARY
Source FY 18 FY 19 FY 20 FY 21 FY 22 Total
Developer Contribution 620,000 620,000 620,000 620,000 620,000 3,100,000
Electric I & E Fund 2,882,200 2,882,200
Electric Revenue 2,989,300 6,384,900 3,214,000 2,990,000 2,610,000 18,188,200
Future Capacity Reserve Fund 6,000,000 6,000,000
General Fund 237,000 239,800 476,800
Water/Wastewater Fund 263,000 266,200 529,200
GRAND TOTAL 6,491,500 7,504,900 10,340,000 3,610,000 3,230,000 31,176,400
Friday, May 12, 2017
178
Page 184
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
PROJECTS BY DEPARTMENT
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Admin
Refrig Piping & Thermostat Wire for Heat Pumps EE1818 1 8,500 8,500
Reed Street HVAC Major Overhaul EE1819 1 1,175,200 1,175,200
Electric Admin Total 8,500 1,175,200 1,183,700
Electric Engineering
Townpoint Development ~ Distribution Feeders EE1513 1 350,000 350,000 350,000 350,000 1,400,000
Garrision Oak / Sun Park Substation EE1801 5 50,000 6,000,000 6,050,000
Ann Avenue Underground Upgrade EE1802 2 133,000 133,000
Beechwood Avenue Underground Upgrade EE1803 3 83,000 83,000
Advanced Metering Infrastructure (AMI) EE1804 1 150,000 1,300,000 1,300,000 1,300,000 1,300,000 5,350,000
Manor Drive Upgrades EE1805 3 51,000 51,000
Hirsch Industries Upgrades EE1806 3 59,000 59,000
McKee Run Plant Alternate Power EE1807 1 100,000 100,000
North Street Substation Sewer Repair EE1808 2 50,000 50,000
Fiber Mapping EE1809 2 69,000 69,000
Fault Indicators EE1810 2 10,000 10,000 10,000 30,000
Transmission Line Maintenance Program EE1814 2 50,000 50,000 50,000 50,000 200,000
Lighting Project and Rehabilitation EE1815 1 100,000 50,000 50,000 50,000 250,000
Distribution Capacitors and Controls EE1816 2 35,000 35,000 35,000 35,000 140,000
Ampacity Standardization EE1817 2 25,000 25,000 25,000 25,000 100,000
System Operations Voice Recorder EE1900 1 18,000 18,000
Farmview Underground Upgrade EE1901 2 113,000 113,000
The Greens Underground Upgrade EE1902 3 92,000 92,000
Derby Estates Upgrade EE1903 1 130,000 130,000
69 kV Cable Replacement North Street EE1904 1 480,700 480,700
Substation Relay Upgrade EE1905 2 150,000 75,000 225,000
College Road Consolidation EE1906 6 120,000 120,000
System Automation EE1907 4 150,000 150,000 150,000 150,000 600,000
Distribution Upgrades EE1908 1 250,000 250,000 250,000 600,000 1,350,000
Electric Engineering Total 1,315,000 3,323,700 8,295,000 2,210,000 2,050,000 17,193,700
Electric T & D
Meter Test Bench Replacement EE 1811 1 40,000 40,000
ABB Switchgear Replacement EE1812 1 450,000 450,000
New Developments EE1813 1 850,000 850,000 850,000 850,000 850,000 4,250,000
Electric T & D Total 1,340,000 850,000 850,000 850,000 850,000 4,740,000
Finance
Enterprise Resource Planning (ERP) Solution FN1701 1 1,500,000 500,000 506,000 2,506,000
Finance Total 1,500,000 500,000 506,000 2,506,000
Power Plant
Friday, May 12, 2017
179
Page 185
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
Van Sant Unit 11 Major Overhaul EG1701 1 1,548,000 150,000 1,698,000
McKee Run Unit #3 Boiler Systems EG1702 1 100,000 299,000 80,000 235,000 175,000 889,000
McKee Run Unit 3 Auxiliary System Components EG1707 2 100,000 277,000 213,000 55,000 65,000 710,000
McKee Run Building Equipment Replacement EG1800 8 20,000 27,000 66,000 45,000 50,000 208,000
Plant Systems Safety & Compliance Improvements EG1801 6 70,000 140,000 210,000
McKee Run & VanSant - Preservation of Structures EG1802 9 55,000 100,000 125,000 125,000 405,000
VanSant Fire Suppression System Upgrade EG1803 3 235,000 235,000
Unit #3 Fast Start Upgrade (Accelerated Startup) EG1804 7 200,000 200,000
Unit #3 Large Equipment Inventory EG1900 1 170,000 110,000 280,000
Van Sant Unit 11 Component Replacements EG1901 1 55,000 70,000 90,000 40,000 255,000
McKee Run Unit 3 Turbine Repairs Intercept Valves EG1902 2 438,000 25,000 463,000
Power Plant Total 2,328,000 1,656,000 689,000 550,000 330,000 5,553,000
GRAND TOTAL 6,491,500 7,504,900 10,340,000 3,610,000 3,230,000 31,176,400
Friday, May 12, 2017
180
Page 186
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Admin
City of Dover, Delaware Contact Electric Director
Type Maintenance
Project # EE1818
Useful Life Unknown
Project Name Refrig Piping & Thermostat Wire for Heat Pumps Category Electric
New Project: Yes Account Number: 487-8400-564.40-31 Priority 1
Time-Line: FY18 Status Active
Total Project Cost: $8,500
Description
Replace refrigerant piping and thermostat wire for heat pumps at Electric Administration, 860 Buttner Place.
Justification
Ongoing failures resulting in multiple "BandAid" repairs resulting in significant bills impacting the operating budget.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 8,500 8,500
Total 8,500 8,500
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 8,500 8,500
Total 8,500 8,500
Budget Impact/Other
Friday, May 12, 2017
181
Page 187
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Admin
City of Dover, Delaware Contact
Type Improvement
Project # EE1819
Useful Life Unknown
Project Name Reed Street HVAC Major Overhaul Category Electric
New Project: Yes Account Number: 487-8400-564.40-31 Priority 1
Time-Line: FY18 Status Active
Total Project Cost: $1,175,200
Description
The failing HVAC system at Reed Street will need a major overhaul. We are waiting on firm estimates as of 2.15.2017
Justification
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 1,175,200 1,175,200
Total 1,175,200 1,175,200
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 1,175,200 1,175,200
Total 1,175,200 1,175,200
Budget Impact/Other
Friday, May 12, 2017
182
Page 188
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1513
Useful Life 20-25 years
Project Name Townpoint Development ~ Distribution Feeders Category Electric
New Project: Yes Account Number: 487-8300-563.90-25 Priority 1
Time-Line: Multi-year Status Active
Total Project Cost: $2,350,000
Description
FY17 - This project will continue to remove troublesome overhead distribution wiring and replace with underground installations. Current plan is
broken into 4 phases dependent on rate structure of boring, electrician services and landscaping fees and was initially approved for a four year
completion. Due to changes in prices, this request will be for a funding out to 2021 at the same $350,000 per year allocated. Current activity has
completed 75% of the first of five phases planned across the next five years (FY17-21). Phases will be completed as funding dictates during the
associated FY accounting for contractor costs and associated expenses.
FY16 - This project involves the systemic replacement of overhead lines with underground lines. Whenever services are being moved, wire is
damaged, trees cause a high number of outages, or development is in progress, and when it is beneficial to the Utility to convert to underground.
This can involve a single line section or an entire residential neighborhood. Annual outage records are reviewed and selected areas are scheduled
for upgrade to underground service. Additionally, this program funds the replacement of existing underground conductors and equipment that
have reached their useful life and have started failing and require replacement.
Justification
FY17 - The conversion from overhead to underground will improve reliability and stability of electric service to the residents of the subdivision.
FY16 - The number of storm and tree-related outages has been greatly reduced under this program and further improvements can be made to insure
the most reliable electric service possible. Reliability has become one of most important factors to electric customers, second only to safety. The
utility has responded by attempting to provide the most reliable system possible. Underground cable replacements are necessary as the useful,
reliable, life of the original underground cable was 20-30 years. By proactively replacing this cable we will minimize outages and improve system
reliability. In addition to cable replacement, overhead lines are replaced with underground to minimize outages caused by tree growth or animal
contact. Lastly, overhead lines that have reached the end of their useful life are replaced with underground instead of rebuilding the overhead.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Continued outages lead to increased complaints from our customers
and will lead to customer dissatisfaction. There will be increased costs for repairs made under outage conditions as well as loss of electric revenue.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
950,000 Construction/Maintenance 350,000 350,000 350,000 350,000 1,400,000
Total Total 350,000 350,000 350,000 350,000 1,400,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
950,000 Electric Revenue 350,000 350,000 350,000 350,000 1,400,000
Total Total 350,000 350,000 350,000 350,000 1,400,000
Budget Impact/Other
FY17 - Previously approved for $1,350,000 over 4 years starting FY2015 ($250,000/$350,000/$350,000/$350,000) with approximately $600,000
spent on initial installation and phased in progress through the development. This request would extend initial request from 4 years to 7 years for
an additional $1,050,000 in funding from FY 2019-2021.
Friday, May 12, 2017
183
Page 189
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Equipment
Project # EE1801
Useful Life 30 Years
Project Name Garrision Oak / Sun Park Substation Category Electric
New Project: Yes Account Number: 487-8300-563.70-60 Priority 5
Time-Line: FY18-FY20 Status Active
Total Project Cost: $6,050,000
Description
FY18 - Requested funding for initial planning and engineering for design and construction of a new electric substation located at Garrison Oak
Park. Amount includes $50,000 for engineering service and associated costs with design and estimation of layout and capabilities of new
substation.
Justification
FY18 - As occupancy of Garrison Oak Technology Park increases, the amount of power drawn will exceed the capabilities of the current City of
Dover Transmission and Distribution system. We currently have 2 megawatts of reserve power for contingency situations for Calpine and we
estimate approximately 500 to 2000 kilowatts of demand per lot. This additional load will not be attainable without a new substation to dedicate to
the park and allow distribution to a limited amount of customers outside the park in residential areas.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 50,000 50,000
Construction/Maintenance 6,000,000 6,000,000
Total 50,000 6,000,000 6,050,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 50,000 50,000
Future Capacity Reserve Fund 6,000,000 6,000,000
Total 50,000 6,000,000 6,050,000
Budget Impact/Other
Friday, May 12, 2017
184
Page 190
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1802
Useful Life 15-20 years
Project Name Ann Avenue Underground Upgrade Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 2
Time-Line: FY18 Status Active
Total Project Cost: $133,000
Description
Replace the original underground primary cabling in the Ann Avenue Development and convert from direct bury to bored installation.
Justification
This project will replace the original direct buried primary cable and replace it with new cable installed by boring. The underground wiring and
equipment has been in place for over 15 years and is direct buried. Utilizing boring the new cable will be placed in conduit and better protected
from the elements and unintentional damage. The original cable also has an external neutral wrapped around the cable while the new cable has the
neutral internal to the cable offering a more stable and dependable system to the customer.
FY17 Increase from $126,000 to $133,000 requested due to price increases for materials
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 133,000 133,000
Total 133,000 133,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 133,000 133,000
Total 133,000 133,000
Budget Impact/Other
Friday, May 12, 2017
185
Page 191
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1803
Useful Life 15-20 years
Project Name Beechwood Avenue Underground Upgrade Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 3
Time-Line: FY18 Status Active
Total Project Cost: $83,000
Description
Replace the original underground primary cabling in the Beechwood Development and convert from direct bury to bored installation.
Justification
This project will replace the original direct buried primary cable and replace it with new cable installed by boring. The underground wiring and
equipment has been in place for over 15 years and is direct buried. Utilizing boring the new cable will be placed in conduit and better protected
from the elements and unintentional damage. The original cable also has an external neutral wrapped around the cable while the new cable has the
neutral internal to the cable offering a more stable and dependable system to the customer.
FY17 Increase from $80,000 to $83,000 requested due to price increases for materials
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 83,000 83,000
Total 83,000 83,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 83,000 83,000
Total 83,000 83,000
Budget Impact/Other
Friday, May 12, 2017
186
Page 192
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1804
Useful Life 20 years
Project Name Advanced Metering Infrastructure (AMI) Category Electric
New Project: Yes Account Number: 487-8300-563.60.46 Priority 1
Time-Line: FY18-FY23 Status Active
Total Project Cost: $6,650,000
Description
Design and installation of an advanced metering infrastructure encompassing both electric and water meters throughout the city.
Justification
This system will give the city the ability to read and totalize billing for primary billed customers. It would also eliminate on-site reconnects and
disconnects which would reduce wear and tear on vehicles and reduce overtime by allowing these actions to be accomplished using a computer
terminal. This system also allows quicker identification of outages, manage peak loads, give better ability to regulate voltages in the system,
predictive outage management vs. reactive and load control and rate adjustment data. This system could also save revenues due to better theft
protection and when fully implemented drastically reduce the reading time of the 109 total routes driven by the meter readers. Existing meter
readers would be utilized in more of a maintenance function to respond to any outages or failures in the system when fully implemented. Project
will continue through 2023.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total Future
Construction/Maintenance 150,000 1,300,000 1,300,000 1,300,000 1,300,000 5,350,000 1,300,000
Total 150,000 1,300,000 1,300,000 1,300,000 1,300,000 5,350,000 Total
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total Future
Electric Revenue 150,000 1,300,000 1,300,000 1,300,000 1,300,000 5,350,000 1,300,000
Total 150,000 1,300,000 1,300,000 1,300,000 1,300,000 5,350,000 Total
Budget Impact/Other
Friday, May 12, 2017
187
Page 193
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1805
Useful Life 20-30 years
Project Name Manor Drive Upgrades Category Electric
New Project: Yes Account Number: 487-8300-563.90-25 Priority 3
Time-Line: FY18 Status Active
Total Project Cost: $51,000
Description
Replacement of antiquated underground power cables, damaged transformer pads and live front transformers on Manor Drive.
Justification
Infrastructure was installed in the 1970s and is reaching the end of its serviceable life expectancy. Additionally, live front transformers are
installed in the area and aside from the age of the equipment, these transformers pose a safety hazard to maintenance personnel.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 51,000 51,000
Total 51,000 51,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 51,000 51,000
Total 51,000 51,000
Budget Impact/Other
Friday, May 12, 2017
188
Page 194
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1806
Useful Life 20 years
Project Name Hirsch Industries Upgrades Category Electric
New Project: Yes Account Number: 487-8300-563.90-25 Priority 3
Time-Line: FY18 Status Active
Total Project Cost: $59,000
Description
Replacement of antiquated underground power cables and switchgear supplying power to Hirsch Industries.
Justification
Presently installed equipment has reached the end of its life expectancy. Additionally, there has been a recent issue with the old metering cabinet
installed on the property that leads us to believe replacement is the best course of action. This will be done in conjunction with direct buried cable,
switchgear and concrete work to restore areas we will need to excavate.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 59,000 59,000
Total 59,000 59,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 59,000 59,000
Total 59,000 59,000
Budget Impact/Other
Friday, May 12, 2017
189
Page 195
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Maintenance
Project # EE1807
Useful Life 20 years
Project Name McKee Run Plant Alternate Power Category Electric
New Project: Yes Account Number: 487-8300-563.90-25 Priority 1
Time-Line: FY18 Status Active
Total Project Cost: $100,000
Description
Re-design of the McKee Run plant 22 kV bus work to provide an alternate power source for unit 3.
Justification
Current configuration of the substation yard adjacent to the McKee Run plant does not facilitate an alternate source of power to the plant. Should a
failure occur, as it did August 2nd 2016, the plant will lose house power and power to the substation. This condition does not allow any control of
the protection circuitry and prevents the plant from supplying power to the generator. During mandated run days, this would result in an
unplanned outage and could result in penalties from PJM for failure to provide contracted power.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 100,000 100,000
Total 100,000 100,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 100,000 100,000
Total 100,000 100,000
Budget Impact/Other
Friday, May 12, 2017
190
Page 196
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Maintenance
Project # EE1808
Useful Life 20 years
Project Name North Street Substation Sewer Repair Category Electric
New Project: Yes Account Number: 487-8300-563.90-25 Priority 2
Time-Line: FY18 Status Active
Total Project Cost: $50,000
Description
Repair of the North Street Substation sewer lateral providing sewer service to the North Street and General Scott substation yard.
Justification
The sewer lateral under the North Street Substation building has collapsed and is in need of repair. Given the current condition of the lateral, fluid
collects in the collapsed line and does not allow the complete evacuation of sewer gasses. This not only causes a bad odor in the substation but the
collection of methane gas could cause a hazard with the operation of electrical equipment in the building.
Estimates were requested by the list of contractors provided by Public Works and they ranged from $25,000 to $50,000. Amount of $50,000
requested would be a high end estimate and a bidding process would be accomplished to select the lowest bidder.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 50,000 50,000
Total 50,000 50,000
Budget Impact/Other
Friday, May 12, 2017
191
Page 197
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Technology
Project # EE1809
Useful Life Ongoing Updates
Project Name Fiber Mapping Category Electric
New Project: Yes Account Number: 487-8300-563.60-64 Priority 2
Time-Line: FY18 Status Active
Total Project Cost: $69,000
Description
Utilize current fiber contractor to perform a 100% inventory and mapping of the city’s fiber system.
Justification
During recent projects involving fiber and the growth of dark fiber leases to outside sources, certain areas of the City’s fiber network are becoming
congested. There has not been an accurate oversight and evaluation of the fiber system in many years and there have been many discrepancies
discovered in our drawings. Due to increasing regulatory requirements from compliance and governing agencies, the ability to use and forecast
additions to the fiber infrastructure are critical. This project will allow us to determine our limitations and capabilities and to develop expansion
plans in the future.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 69,000 69,000
Total 69,000 69,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 69,000 69,000
Total 69,000 69,000
Budget Impact/Other
Expense type. Not an asset.
Friday, May 12, 2017
192
Page 198
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1810
Useful Life 15-20 years
Project Name Fault Indicators Category Electric
New Project: Yes Account Number: 487-8300-563.90-25 Priority 2
Time-Line: FY16-FY20 Status Active
Total Project Cost: $40,000
Description
Replacing fault indicators for overhead and underground primaries.
Justification
Aids in restoring power during an outage and finding the causes of said outages.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
10,000 Construction/Maintenance 10,000 10,000 10,000 30,000
Total Total 10,000 10,000 10,000 30,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
10,000 Electric Revenue 10,000 10,000 10,000 30,000
Total Total 10,000 10,000 10,000 30,000
Budget Impact/Other
Friday, May 12, 2017
193
Page 199
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Maintenance
Project # EE1814
Useful Life 20-25 years
Project Name Transmission Line Maintenance Program Category Electric
New Project: No Account Number: 487-8300-563.70-35 Priority 2
Time-Line: On Going Maint. Status Active
Total Project Cost: $275,000
Description
FY17 Note – While there has been no major maintenance required this FY due to higher priority projects, this funding can be critical to restoration
of power due to storm loss or catastrophic component failure. Certain areas have 795 ASCR cable in overhead applications and have one wire per
phase. Unit of issue for the wire is by the spool and each spool is 3,470 feet so to replace 3 phases of 795 cable across 3,470 feet would cost
approximately $18,600 not including associated hardware.
FY16 - Replace aging porcelain insulators and related components on the transmission system with new polymer insulators and components.
Justification
IInsulators have a defined equipment life due to sun and weather conditions breaking down the porcelain and base bonding cement. Insulators
installed in 1960's and 1970's are due for replacement because of this deterioration. We have experienced several transmission outages due to
insulator failure. Replacing the insulators should extend the life an additional 30 years.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Outages may occur if insulators are not replaced and fail due to
deterioration.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
75,000 Construction/Maintenance 50,000 50,000 50,000 50,000 200,000
Total Total 50,000 50,000 50,000 50,000 200,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
75,000 Electric Revenue 50,000 50,000 50,000 50,000 200,000
Total Total 50,000 50,000 50,000 50,000 200,000
Budget Impact/Other
Friday, May 12, 2017
194
Page 200
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Maintenance
Project # EE1815
Useful Life 10-12 years
Project Name Lighting Project and Rehabilitation Category Electric
New Project: No Account Number: 487-8300-563.50-76 Priority 1
Time-Line: Continuous Status Active
Total Project Cost: $300,000
Description
FY17 - Continual replacement of existing lighting and upgrade of lighting to more energy efficient LED lights. There were 25 lights on RT 13 that
were converted to LED. Coordinating with Dover Police Department to install LEDs in several alleys to provide better lighting for residents and
emergency responders.
FY16 -This fund was developed to replace and repair existing street lights or install new lights upon customer request.
COMMENTS: This fund will remain active as long as there are improvements to be made. Private area lighting requests are a source of revenue for
the City. Areas completed are White Oak Apartments, Westfield, Fairview, Cranberry Run, Millcreek, Independence Village and Governors
Avenue (South 100 Block), Deerfield, Central Middle School, Fox Hall, Hidden Oaks, a portion of North Governors Ave, The Meadows,
Turnberry, Baltray,
Bicentennial, The Overlook and Woodcrest. Areas to be completed this budget year include Old Mill Acres and Eagles Nest.
Justification
FY17 -radual conversion of existing lights to LED lights will provide a longer useful life and reduce replacement costs as well as monthly electric
consumption for the City.
FY16 - The Electric Division receives numerous requests for lighting improvements. These requests are due to the lights aging, and as they age
they put out less light and become unreliable. There are many developments that are in need of street light improvements. This fund would also
provide funding for new private security light requests.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Constant complaints of poor street lighting and multiple failures due to
antiquated lights.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
50,000 Construction/Maintenance 100,000 50,000 50,000 50,000 250,000
Total Total 100,000 50,000 50,000 50,000 250,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
50,000 Electric Revenue 100,000 50,000 50,000 50,000 250,000
Total Total 100,000 50,000 50,000 50,000 250,000
Budget Impact/Other
Friday, May 12, 2017
195
Page 201
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1816
Useful Life 15-20 years
Project Name Distribution Capacitors and Controls Category Electric
New Project: No Account Number: 487-8300-563.60-82 Priority 2
Time-Line: Continuous Status Active
Total Project Cost: $190,000
Description
Install distribution capacitors throughout the system to correct poor power factor on distribution circuits. Install capacitor controllers capable of
two-way communication to provide real-time monitoring and remote control operation. These controllers will be capable of switching the
capacitors on and off to comply with system requirements. This project will also replace outdated substation equipment, capable of advanced
metering such as power factor and harmonics to further analyze system performance remotely. Lastly, distribution line recorders will be purchased
and installed to provide power factor recordings to fine tune this operation.
COMMENTS: The required substation equipment installation will be completed in two phases. FY2016 will upgrade the required communication
equipment installed 20 years ago. FY2017 will install equipment capable of extracting system data, for enhanced performance analyzing. The
completion of these two phases will ultimately reduce engineering time and costs because of remote access to all substations. In addition to this
advanced metering, event report extraction and analysis, relay settings review and installation, and advancements to our 24 hour system operation
center will be also be realized. FY2016 -FY2020 will be the addition of capacitor banks and controllers into the distribution system.
Justification
Additional capacitance is required in order to meet system power factor requirements at the Delmarva Power and Light interchange point. This was
substantiated through a load-flow study conducted by Shaw in early 2004 and distribution study by Wilson & Wilson in 2006. The current
capacitor controls are not providing the granularity required to turn them off and on as required to meet both the power quality requirements of our
customers and DP&L requirements. Additional controls are required to fine tune the systems operation.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Without the additional capacitor banks and more importantly controls,
the City may experience a low/high voltage problem at the customer level and/or the possibility of having to pay power factor penalties to
Delmarva Power and Light.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
50,000 Construction/Maintenance 35,000 35,000 35,000 35,000 140,000
Total Total 35,000 35,000 35,000 35,000 140,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
50,000 Electric Revenue 35,000 35,000 35,000 35,000 140,000
Total Total 35,000 35,000 35,000 35,000 140,000
Budget Impact/Other
Friday, May 12, 2017
196
Page 202
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1817
Useful Life 15-20 years
Project Name Ampacity Standardization Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 2
Time-Line: FY17-FY21 Status Active
Total Project Cost: $125,000
Description
Standardize the primary overhead and underground distribution wiring to allow consistent ampacity throughout the City’s feeders.
Justification
This project will replace segments of overhead and underground wiring to allow for a consistent ampacity rating throughout the City. Currently
there are several sections of primary distribution wiring that lower the overall ampacity of the circuit which can hinder growth, cause equipment
failure and cause outages due to increased demand. This project will be worked in conjunction with other projects to increase reliability and
stability of the City’s infrastructure.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
25,000 Construction/Maintenance 25,000 25,000 25,000 25,000 100,000
Total Total 25,000 25,000 25,000 25,000 100,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
25,000 Electric Revenue 25,000 25,000 25,000 25,000 100,000
Total Total 25,000 25,000 25,000 25,000 100,000
Budget Impact/Other
Friday, May 12, 2017
197
Page 203
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Equipment
Project # EE1900
Useful Life 5-10 years
Project Name System Operations Voice Recorder Category Electric
New Project: Yes Account Number: 487-8300-563.40-25 Priority 1
Time-Line: FY19 Status Active
Total Project Cost: $18,000
Description
Replace aging System Operations voice recorder
Justification
The voice recorder is used to tape all System Operations phone calls and radio traffic. These recordings contain switching schedule and outage
radio traffic which may be required for litigation purposes.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 18,000 18,000
Total 18,000 18,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 18,000 18,000
Total 18,000 18,000
Budget Impact/Other
Friday, May 12, 2017
198
Page 204
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1901
Useful Life 15-20 years
Project Name Farmview Underground Upgrade Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 2
Time-Line: FY19 Status Active
Total Project Cost: $113,000
Description
Replace the original underground primary cabling in the Farmview Development and convert from direct bury to bored installation.
Justification
This project will replace the original direct buried primary cable and replace it with new cable installed by boring. The underground wiring and
equipment has been in place for over 15 years and is direct buried. Utilizing boring the new cable will be placed in conduit and better protected
from the elements and unintentional damage. The original cable also has an external neutral wrapped around the cable while the new cable has the
neutral internal to the cable offering a more stable and dependable system to the customer.
FY17 Increase from $110,000 to $113,000 requested due to price increases for materials
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 113,000 113,000
Total 113,000 113,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 113,000 113,000
Total 113,000 113,000
Budget Impact/Other
Friday, May 12, 2017
199
Page 205
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1902
Useful Life 15-20 years
Project Name The Greens Underground Upgrade Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 3
Time-Line: FY19 Status Active
Total Project Cost: $92,000
Description
Replace the original underground primary cabling in the Greens Development and convert from direct bury to bored installation.
Justification
This project will replace the original direct buried primary cable and replace it with new cable installed by boring. The underground wiring and
equipment has been in place for over 15 years and is direct buried. Utilizing boring the new cable will be placed in conduit and better protected
from the elements and unintentional damage. The original cable also has an external neutral wrapped around the cable while the new cable has the
neutral internal to the cable offering a more stable and dependable system to the customer.
FY17 Increase from $90,000 to $92,000 requested due to price increases for materials
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 92,000 92,000
Total 92,000 92,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 92,000 92,000
Total 92,000 92,000
Budget Impact/Other
Friday, May 12, 2017
200
Page 206
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1903
Useful Life Unknown
Project Name Derby Estates Upgrade Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 1
Time-Line: FY19 Status Active
Total Project Cost: $130,000
Description
Replace aging infrastructure that has been installed for 25 + years.
Justification
Current equipmetn and cable have been installed for over 25 years and have reached the end of their life expectancy. This will replace all pedestals,
transformers and cables while also removing the old direct bury cable and replacing with conduit to provide increased protection and reliability of
the equipment.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 130,000 130,000
Total 130,000 130,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 130,000 130,000
Total 130,000 130,000
Budget Impact/Other
Friday, May 12, 2017
201
Page 207
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1904
Useful Life 30+ years
Project Name 69 kV Cable Replacement North Street Category Electric
New Project: No Account Number: 487-8300-563.50-83 Priority 1
Time-Line: FY15-FY18 Status Active
Total Project Cost: $615,700
Description
Replace the aging 69 KV underground cables from North Street switching yard to Kraft’s and Proctor & Gamble’s (customer owned) substations.
TIME-LINE/CURRENT STATUS: Engineering is scheduled for FY15/FY16 with completion in FY18.
COMMENTS: Proactively replacing cables that have reached their anticipated life.
Justification
Proctor & Gamble and Kraft are two (2) of the City of Dover’s 69 KV customers and it is our obligation to provide them with adequate and
reliable service. The cables were installed in 1973 and have had two repairs. The first repair was in 1986 and the second repair was in 1992.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Customer outages due to failing conductor. Additionally, the limited
capacity of a single circuit could restrict the possible generation of NRG and the production of Proctor & Gamble and Kraft Foods. This project
will take some time as the old cable is buried in concrete which will require rerouting.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
135,000 Construction/Maintenance 480,700 480,700
Total Total 480,700 480,700
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
135,000 Electric Revenue 480,700 480,700
Total Total 480,700 480,700
Budget Impact/Other
Friday, May 12, 2017
202
Page 208
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1905
Useful Life 25 - 30 years
Project Name Substation Relay Upgrade Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 2
Time-Line: FY17 - FY19 Status Active
Total Project Cost: $350,000
Description
Replacement of selected relay components to standardize the entire COD system by converting to an all Schweitzer relaying and protection
configuration. Replace out dated substation Relaying (protection) equipment and upgrade RTAC (Real-Time Automation Controller)
Justification
This upgrade will greatly improve the monitoring capabilities of the city’s distribution system and add the capability of monitoring power factor at
all substations. This upgrade will also help in analyzing the fault and determining the causes of outages and anomalies. It will also improve the
system reliability with the upgrade to the RTAC by providing more dependable and real time monitoring of the COD power grid through the
SCADA system.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
125,000 Planning/Design 50,000 50,000
Construction/Maintenance 100,000 75,000 175,000
Total
Total 150,000 75,000 225,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
125,000 Electric Revenue 150,000 75,000 225,000
Total Total 150,000 75,000 225,000
Budget Impact/Other
Friday, May 12, 2017
203
Page 209
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1906
Useful Life 25 - 30 years
Project Name College Road Consolidation Category Electric
New Project: Yes Account Number: 487-8300-563.40-31 Priority 6 --
Time-Line: FY18 Status Active
Total Project Cost: $120,000
Description
The high-side of the substation will be upgraded to include transmission line protection breakers.
Justification
This project will consolidate the College Road substation into one existing building instead of the current configuration taking up two buildings.
The metal clad switchgear has eight distribution circuits breakers and all the distribution protection relays. All the 69kv transmission line
protection relays are in the old College Road building, which is about 25 years old. We would like to move the 69kv transmission line protection
relays in to the metal clad switchgear with all the other relays so we will have all the protection relays in one location. By keeping all the relays in
one location, this will help us reduce the restoration time during an outage as well as cut down the maintenance cost by eliminating the extra
building. Subsequent removal of the unused building will also allow for further expansion of the substation as required.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 60,000 60,000
Construction/Maintenance 60,000 60,000
Total 120,000 120,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 120,000 120,000
Total 120,000 120,000
Budget Impact/Other
Friday, May 12, 2017
204
Page 210
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1907
Useful Life 5-10 years
Project Name System Automation Category Electric
New Project: Yes Account Number: 487-8300-563.70-28 Priority 4
Time-Line: FY18-FY21 Status Active
Total Project Cost: $600,000
Description
Design, develop, and install a self-healing or "smart" distribution system.
Justification
This project will include an engineering study to be performed using a system model to develop a scheme that will allow the distribution system to
be self-healing in the event of a fault. Following the study, automation equipment will be purchased to detect problems on the system, isolate the
affected area, and reenergize lines not affected. This will improve the reliability of the city’s local electric grid, minimize customer outages, and
increase customer satisfaction.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Planning/Design 150,000 150,000 150,000 150,000 600,000
Total 150,000 150,000 150,000 150,000 600,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 150,000 150,000 150,000 150,000 600,000
Total 150,000 150,000 150,000 150,000 600,000
Budget Impact/Other
Friday, May 12, 2017
205
Page 211
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric Engineering
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1908
Useful Life 20-25 years
Project Name Distribution Upgrades Category Electric
New Project: No Account Number: 487-8300-563.90-25 Priority 1
Time-Line: On Going Maint. Status Active
Total Project Cost: $1,350,000
Description
This project involves the systemic replacement of overhead lines with underground lines whenever services are being moved, wire is damaged,
trees cause a high number of outages, or development is in progress, and when it is beneficial to the Utility to convert to underground. This can
involve a single line section or an entire residential neighborhood. Annual outage records are reviewed and selected areas are scheduled for
upgrade to underground service. Additionally, this program funds the replacement of existing underground conductors and equipment that have
reached their useful life and have started failing and require replacement.
This account is used to upgrade any trouble areas during the year.
Justification
The number of storm and tree-related outages have been greatly reduced under this program and further improvements can be made to insure the
most reliable electric service possible. Reliability has become one of most important factors to electric customers, second only to safety. The utility
has responded by attempting to provide the most reliable system possible. Underground cable replacements are necessary as the useful, reliable, life
of the original underground cable was 20-30 years. By proactively replacing this cable we will minimize outages and improve system reliability. In
addition to cable replacement, overhead lines are replaced with underground to minimize outages caused by tree growth or animal contact. Lastly,
overhead lines that have reached the end of their useful life are replaced with underground instead of rebuilding the overhead.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: Continued outages lead to increased complaints from our customers
and will lead to customer dissatisfaction. There will be increased costs for repairs made under outage conditions as well as loss of electric revenue.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 250,000 250,000 250,000 600,000 1,350,000
Total 250,000 250,000 250,000 600,000 1,350,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 250,000 250,000 250,000 600,000 1,350,000
Total 250,000 250,000 250,000 600,000 1,350,000
Budget Impact/Other
Friday, May 12, 2017
206
Page 212
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric T & D
City of Dover, Delaware Contact Electric Director
Type Equipment
Project # EE 1811
Useful Life 10 years
Project Name Meter Test Bench Replacement Category Electric
New Project: Yes Account Number: 487-8200-562.40-25 Priority 1
Time-Line: FY18 Status Active
Total Project Cost: $40,000
Description
Automated singel / three phase meter test system bench.
Justification
Current test bench is failing and the equipment is no longer supported for repairs.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 40,000 40,000
Total 40,000 40,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 40,000 40,000
Total 40,000 40,000
Budget Impact/Other
Friday, May 12, 2017
207
Page 213
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric T & D
City of Dover, Delaware Contact Electric Director
Type Improvement
Project # EE1812
Useful Life 20 years
Project Name ABB Switchgear Replacement Category Electric
New Project: Yes Account Number: 487-8200-562.60-34 Priority 1
Time-Line: FY18 Status Active
Total Project Cost: $450,000
Description
Replacement of habitually failing switchgear (ABB, manufactured 2009 & 2012) in service throughout the city plus associated elbows and other
items found defective.
Justification
There are currently 21 switchgears in service that will require replacement under this CIP, 13 PME-9 and 8 PME-11. The city has replaced
approximately 6 of these switchgears over the last year after they experienced catastrophic failure. Some of those replaced were done so proactively
prior to failure. We have determined the most likely cause of the failure is due to accumulation of moisture in this particular manufacturer and date
of manufacture. This company no longer offers this product on the market and we have no more in our warehouse. We have not experienced a
similar failure rate with other manufacturers in service around the city.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Equip/Vehicle/Furnishings 450,000 450,000
Total 450,000 450,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 450,000 450,000
Total 450,000 450,000
Budget Impact/Other
Friday, May 12, 2017
208
Page 214
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Electric T & D
City of Dover, Delaware Contact Public Works Director
Type Improvement
Project # EE1813
Useful Life 30+ years
Project Name New Developments Category Electric
New Project: No Account Number: 4878200-562.Several Priority 1
Time-Line: Continuous Status Active
Total Project Cost: $4,250,000
Description
This project purchases materials and equipment that are used to provide electric service to new housing developments, businesses, and industrial
developments. Additionally, a portion of this expense is offset by the extension payments whereby new developers pay a $1,600 per residential lot
connection fee, or business and industrial developers pay the total material expense for line extensions.
This is an ongoing project and affects three separate accounts:
487-8200-562.60-31
487-8200-562.60-34
487-8200-562.60-46
COMMENTS: Not all new development projects are known during budget preparation, as some will arise during the year.
Justification
During the course of each budget year, new developers request line extensions for new electric projects. Some are new projects, while other
projects may have received plan approval previously but were not completed for any number of reasons.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 850,000 850,000 850,000 850,000 850,000 4,250,000
Total 850,000 850,000 850,000 850,000 850,000 4,250,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Developer Contribution 620,000 620,000 620,000 620,000 620,000 3,100,000
Electric Revenue 230,000 230,000 230,000 230,000 230,000 1,150,000
Total 850,000 850,000 850,000 850,000 850,000 4,250,000
Budget Impact/Other
Friday, May 12, 2017
209
Page 215
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Finance
City of Dover, Delaware Contact Controller/Treasurer
Type Technology
Project # FN1701
Useful Life 10 years
Project Name Enterprise Resource Planning (ERP) Solution Category Electric
New Project: Yes Account Number: 480-9900-582.90-23 Priority 1
Time-Line: FY17-FY21 Status Active
Total Project Cost: $2,606,000
Description
This project involves consulting services and purchase of Enterprise Resource Planning (ERP) Solution to support the business processes of the
City of Dover.
Justification
The City's current ERP software is Sungard Public Sector's Select/Naviline version 8.0.2.0. It is an IBM System powered environment (iSeries).
This system is a legacy system that came out of the Y2K era, when previous systems were not programmed for the year 2000. The Sungard Public
Sector system was purchased in April 1997.
The technology for ERP systems have evolved from mainframe based systems (AS400) to Personal Computer (PC) based systems either hosted by
the software provider through the internet or hosted by the customer on file servers. The industry trend is to drive access to customers with web
and app based delivery models.
Project Strategy & Objectives:
- The City requires an integrated environment where any user can access the data they need.
- The City will emphasize a self-service environment with technology enabling and not hindering the users to easily access data with the proper
controls at the point of data entry.
- The City desires to utilize rational data base technology plus easy report and query writing tools to accomplish this.
- The City realizes that this goal will not be accomplished through new technology alone but also requires extensive process changes and
organizational support.
- Management requires better access to data, information and reporting that is currently unavailable or significantly restricted.
- As a result of current limitations to functionallity and access to data, City personnel have developed work-around processes that are impacting
City business.
- Third-party software integrations with the current system are extremely difficult, limited or unvailable.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
100,000 ERP System 1,500,000 500,000 506,000 2,506,000
Total Total 1,500,000 500,000 506,000 2,506,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
100,000 Electric I & E Fund 1,500,000 1,500,000
General Fund 237,000 239,800 476,800
Total
Water/Wastewater Fund 263,000 266,200 529,200
Total 1,500,000 500,000 506,000 2,506,000
Budget Impact/Other
Annual Operating impact is being evaluated to determine the net difference with the current ERP/ancillary systems and support versus the
recommended solution. The current estimate for the new fully integrated ERP solution is approximately $300,000 annuallly. Current cost is being
evaluated as above.
Friday, May 12, 2017
210
Page 216
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Improvement
Project # EG1701
Useful Life 20 years
Project Name Van Sant Unit 11 Major Overhaul Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 1
Time-Line: FY17 - FY19 Status Active
Total Project Cost: $2,098,000
Description
This project will perform a major overhaul on the turbine generator based on Original Equipment Manufacturer (OEM) recommended repair
frequency which is based on factored starts of the Unit from first commissioning and from last inspection / repair interval. This project will be
implemented in 2017 with long lead material purchases and spare parts (fuel nozzles) refurbishment in 2017 and the open, inspection and repair of
the combustion turbine during the 2018 budget year.
Justification
This project is required to fund the purchase of all parts needed to perform a major overhaul on the unit based on estimated factored starts since
unit was first commissioned and since last the Hot Gas Path inspection. This project will span the course of two years. In Year 1, the majority of
the long lead parts will be purchased and spare parts (fuel nozzles) refurbishment. Services will be identified in year 2 and the actual installation
will be performed in Year 2. Extended equipment and /or unit outage time will result from lack of funding this project. This will have a direct
effect on the cost of energy during the extended outage time as well as increase future energy capacity charges. In addition, gradual degradation of
the unit’s output could occur which would have a negative effect on the capacity rating of the unit and reliability of the unit.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
400,000 Construction/Maintenance 1,548,000 150,000 1,698,000
Total Total 1,548,000 150,000 1,698,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
400,000 Electric I & E Fund 602,200 602,200
Electric Revenue 945,800 150,000 1,095,800
Total
Total 1,548,000 150,000 1,698,000
Budget Impact/Other
Friday, May 12, 2017
211
Page 217
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1702
Useful Life Unknown
Project Name McKee Run Unit #3 Boiler Systems Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 1
Time-Line: Multi-year Status Active
Total Project Cost: $1,393,800
Description
This Project was developed to perform inspections and repairs to the Unit 3 boiler on a predetermined frequency based on unit operating hours,
required regulatory inspection intervals, and known equipment condition. In general, most work activities are those requiring planned outages and
therefore will be scheduled to coincide with planned outages. The work identified includes the following:
Replacement of water wall tubes as needed. Replace burner throat refractory.
OEM inspection to include super heater and re-heater sections. HEP and FAC program to inspect and repair critical piping / hangers. (2019-2020)
Replacement of super heater and re-heater boiler clips. Air preheater inspection and repairs. De-aerator heater and storage tank inspection.
Feed water heater shell inspections including relief valve testing.
Replace CEMS sample line every 5 years – regulatory requirement.
Note: Project costs in years beyond 2018 are shown for expense planning purposes and represent future projects related to this equipment that are
anticipated based on expected operation.
Justification
Critical system equipment represents components that, if they fail, will result in loss of generation and or capacity. Routine evaluation of the
condition of critical components will allow for proper prioritization of maintenance activities and resources. Delaying this project could result in
the failure of critical unit equipment and subsequent loss of generation and or capacity. More importantly, component failure could also result in
safety risk to personnel.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
504,800 Construction/Maintenance 100,000 299,000 80,000 235,000 175,000 889,000
Total Total 100,000 299,000 80,000 235,000 175,000 889,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
504,800 Electric I & E Fund 100,000 100,000
Electric Revenue 299,000 80,000 235,000 175,000 789,000
Total
Total 100,000 299,000 80,000 235,000 175,000 889,000
Budget Impact/Other
Friday, May 12, 2017
212
Page 218
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1707
Useful Life
Project Name McKee Run Unit 3 Auxiliary System Components Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 2
Time-Line: Multi-year Status Active
Total Project Cost: $838,000
Description
This project will perform inspections and repairs of Unit 3 auxiliary system components focusing on critical components. Components identified
that will be addressed in 2018 include the #3 and 4 service water pumps, heat exchanger and piping safety valves.
#3 and #4 service water pump inspections and refurbishment / replacement.
Air compressor inspections and repairs.
Unit #3 boiler feed pump inspections.
Unit #3 circulating water pumps rebuild – pump end.
#1 and #2 hot water boiler inspections – refractory and tube inspection.
Note: Project costs in years beyond 2018 are shown for expense planning purposes and represent future projects related to this equipment that are
anticipated based on expected operation.
Justification
Critical auxiliary systems components are those components that, if they were to fail, their failure could result in unit load reduction or outage with
consequential loss of capacity and / or generation although they would not individually affect the long range financial viability of the unit.
Addressing these assets in a systematic fashion will result in minimizing forced outages and eliminating major maintenance expenses associated
with component failure. Performing work as scheduled will also levelize maintenance expenditures. Delaying this project could result in the failure
of critical unit equipment and subsequent loss of generation and/ or capacity.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
128,000 Construction/Maintenance 100,000 277,000 213,000 55,000 65,000 710,000
Total Total 100,000 277,000 213,000 55,000 65,000 710,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
128,000 Electric I & E Fund 100,000 100,000
Electric Revenue 277,000 213,000 55,000 65,000 610,000
Total
Total 100,000 277,000 213,000 55,000 65,000 710,000
Budget Impact/Other
Friday, May 12, 2017
213
Page 219
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1800
Useful Life Unknown
Project Name McKee Run Building Equipment Replacement Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 8 --
Time-Line: Multi-year Status Active
Total Project Cost: $267,000
Description
This project includes the replacement of certain building support systems that are expected to reach the end of their useful life. The specific
building systems to be addressed in 2016 include:
Supervisor’s Office roof top Air Conditioners
Contractor rebuild for the 2A Air Compressor
Administrative Building heating and cooling systems.
Roof repairs.
DI Room modifications.
Replace hot water heaters as needed.
Note: Project costs in years beyond 2018 are shown for expense planning purposes and represent future projects related to this equipment that are
anticipated based on expected operation.
Justification
This project is required to fund the replacement of equipment that has reached the end of its design life. Continued increases in the costs to
maintain this equipment will result if the listed equipment is not kept up to date or replaced in a timely manner. In addition, critical temperature
control is necessary to keep plant instrumentation located in the control room at acceptable operating conditions. Replacement of the control room
air conditioners is scheduled for 2017. Waiting for the air conditioning to fail and allowing the temperatures in the control room to exceed control
conditions could contribute to reduced control equipment life and reduced unit reliability.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
59,000 Construction/Maintenance 20,000 27,000 66,000 45,000 50,000 208,000
Total Total 20,000 27,000 66,000 45,000 50,000 208,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
59,000 Electric I & E Fund 20,000 20,000
Electric Revenue 27,000 66,000 45,000 50,000 188,000
Total
Total 20,000 27,000 66,000 45,000 50,000 208,000
Budget Impact/Other
Friday, May 12, 2017
214
Page 220
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1801
Useful Life Unknown
Project Name Plant Systems Safety & Compliance Improvements Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 6 --
Time-Line: Multi-year Status Active
Total Project Cost: $322,000
Description
This project will install video cameras to replace outdated cameras and upgrade installed security cameras at McKee Run. The project will also
install cameras at VanSant Generating Station where there are no current cameras installed. Additionally, the project will include replacement of
outdated radios and replace deteriorating boundary fencing at the McKee Run and VanSant Generating Stations. The installation of this equipment
will aid in improving plant security at both sites and improve personnel safety at both sites.
Justification
This project is required to improve overall surveillance coverage and security at both McKee Run and VanSant generating plant sites. Currently,
VanSant Generating Station does not have any video surveillance and the installed cameras at McKee Run are old and antiquated. Boundary line
fencing is original and deteriorated.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
112,000 Construction/Maintenance 70,000 140,000 210,000
Total Total 70,000 140,000 210,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
112,000 Electric I & E Fund 70,000 70,000
Electric Revenue 140,000 140,000
Total
Total 70,000 140,000 210,000
Budget Impact/Other
Friday, May 12, 2017
215
Page 221
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1802
Useful Life Unknown
Project Name McKee Run & VanSant - Preservation of Structures Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 9 --
Time-Line: Multi-year Status Active
Total Project Cost: $536,000
Description
This project involves the preservation of plant structures in order to prevent deterioration of building structural steel and equipment subject to
corrosion due to the past operations and environment. Refurbishment costs include be the sandblasting and painting of identified structures and
equipment, along with the removal or demolition of equipment that has been retired in place. This work is an ongoing effort spanning multiple
years. Work identified includes the following:
2018 – Unit #3 boiler support beams, sandblast, prime and paint.
2018 – Unit #3 condenser inlet piping inspection and refurbishment or repairs based on inspection findings.
Note: Project costs in years beyond 2018 are shown for expense planning purposes and represent future projects related to this equipment that are
anticipated based on expected operation.
Justification
Structural steel painting is needed in various areas throughout the plant proper as well as various outbuildings on the plant property to maintain the
physical building structures and equipment in an acceptable condition and prevent further deterioration. This project represents a minimum
preservation and maintenance of structures consistent with the expected life of the stations. Consequences of delaying or eliminating this project
will result in the accelerated deterioration of plant structures and larger future costs associated with structural repairs.
Prior Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
131,000 Construction/Maintenance 55,000 100,000 125,000 125,000 405,000
Total Total 55,000 100,000 125,000 125,000 405,000
Prior Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
131,000 Electric I & E Fund 55,000 55,000
Electric Revenue 100,000 125,000 125,000 350,000
Total
Total 55,000 100,000 125,000 125,000 405,000
Budget Impact/Other
Friday, May 12, 2017
216
Page 222
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1803
Useful Life Unknown
Project Name VanSant Fire Suppression System Upgrade Category Electric
New Project: Yes Account Number: 487-8101-591.40-31 Priority 3
Time-Line: FY17 Status Active
Total Project Cost: $235,000
Description
This project is to replace the installed CARDOX® fire suppression system for the Van Sant combustion turbine generator. The current system has
been installed since original commercial operation began in 1991.This system has been inadvertently activated three times since installation and
there have been many improvements including more reliable fire suppression systems. The system selected is a water misting system and is the one
of the newer preferred suppression systems using a water mist/injection as the extinguishing agent instead of CO2.
Justification
This critical system can directly impact the Unit operation. Its failure to operate would result in a loss of generation and capacity due to the damage
incurred from a fire. Upgrading this system will result in reduced system maintenance costs, and eliminating major maintenance expenses
associated with the system or component failure.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 235,000 235,000
Total 235,000 235,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric I & E Fund 235,000 235,000
Total 235,000 235,000
Budget Impact/Other
Friday, May 12, 2017
217
Page 223
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1804
Useful Life
Project Name Unit #3 Fast Start Upgrade (Accelerated Startup) Category Electric
New Project: Yes Account Number: 487-8101-591-40-31 Priority 7 --
Time-Line: FY18 Status Active
Total Project Cost: $200,000
Description
An alternative engineered method for starting up the unit 3 steam turbine generator in a reduced start time will reduce start up time and costs. The
benefits are reduced start up time, increased revenue through faster online times, potential increased unit dispatch, reduced startup costs, increased
equipment life, reduced maintenance (both O&M and Capital) and reduced environmental impact.
Justification
Major objective is to increase the number of starts on the unit while minimizing start-up costs, reduce the time to dispatch the unit, reduce boiler
degradation due to differential temperature induced stress on thick walled system and equipment components.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 200,000 200,000
Total 200,000 200,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric I & E Fund 200,000 200,000
Total 200,000 200,000
Budget Impact/Other
Friday, May 12, 2017
218
Page 224
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1900
Useful Life 10 years
Project Name Unit #3 Large Equipment Inventory Category Electric
New Project: Yes Account Number: 487-8101-591.40-31 Priority 1
Time-Line: FY18-FY19 Status Active
Total Project Cost: $280,000
Description
This capital improvement project item is to purchase those few spare motors for inventory that would allow for having a spare motor “on the shelf”
which can be replaced in as little as a day and significantly reduce the loss of capacity or availability due to that failed motor. The motors would be
stored in the McKee Run Generating Station warehouse and be readily accessible if needed any day or night of the week for the staff to replace.
This would allow for a very short return to full capacity and availability of Unit #3 boiler.
Induced Draft Fan Motor approximate costs - $75,000
Forced Draft Fan Motor approximate costs - $35,000
Circulating Water Pump Motor approximate costs – $125,000
Unit #3 Generator Field Breaker approximate costs - $45,000
Justification
The City inventory does not have major equipment spare parts (motors) that if the motor for these particular pieces of equipment failed the loss of
capacity payments from the potential de-rate or loss of a unit motor would amount to a loss of capacity revenue in as little as two weeks due to that
loss of availability.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 170,000 110,000 280,000
Total 170,000 110,000 280,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 170,000 110,000 280,000
Total 170,000 110,000 280,000
Budget Impact/Other
Friday, May 12, 2017
219
Page 225
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1901
Useful Life Unknown
Project Name Van Sant Unit 11 Component Replacements Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 1
Time-Line: Multi-year Status Active
Total Project Cost: $255,000
Description
This fund was developed to perform inspections and repairs to the VanSant Unit 11 auxiliary equipment on a predetermined frequency based on
unit operating hours, required regulatory inspection intervals, and known equipment condition. Work to be performed would include the following
equipment:
Refurbish exhaust frame blower “B” and motor refurbishment
Injection water pump and motor refurbishment, “A” exhaust frame blower and motor refurbishment
Replace leaking DI system carbon filter vessel.
Water injection pumps inspections and rebuilds.
B Cooling Water pump and motor.
Fogging system inspections and repairs.
Note: Project costs in years beyond 2018 are shown for expense planning purposes and represent future projects related to this equipment that are
anticipated based on expected operation.
Justification
This project is required to fund the replacement of capital items that are expected to reach their useful life and will need to be replaced or
refurbished to maintain plant system and unit reliability. Extended equipment and /or unit outage time will result from lack of funding this project.
This will have a direct effect on the cost of energy during the extended outage time as well as increase future energy capacity charges.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 55,000 70,000 90,000 40,000 255,000
Total 55,000 70,000 90,000 40,000 255,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 55,000 70,000 90,000 40,000 255,000
Total 55,000 70,000 90,000 40,000 255,000
Budget Impact/Other
Friday, May 12, 2017
220
Page 226
FY 2018 Capital Investment Plan FY 18 thru FY 22 Department Power Plant
City of Dover, Delaware Contact Power Plant Manager
Type Maintenance
Project # EG1902
Useful Life Unknown
Project Name McKee Run Unit 3 Turbine Repairs Intercept Valves Category Electric
New Project: No Account Number: 487-8101-591.40-31 Priority 2
Time-Line: FY19-FY20 Status Active
Total Project Cost: $463,000
Description
This project will inspect the Unit 3 turbine control and stop valves and auxiliary equipment. This inspection is scheduled on a predetermined
frequency based on Unit operating hours, required regulatory intervals, original equipment manufacturer and insurance company
recommendations. In 2018 all turbine control, stop, and intercept valves will be fully disassembled, inspected and repaired if needed.
Note: Project costs in years beyond 2018 are shown for expense planning purposes and represent future projects related to this equipment that are
anticipated based on expected operation and insurance company recommendations.
Justification
The valve inspections included in the scope are all related to the normal and emergency turbine generator control and shutdown systems. Industry
standard inspection guidelines are followed in order to minimize the risk of mechanical failure which could result in extended forced outage of the
unit, or the potential indefinite loss of unit availability.
Expenditures FY 18 FY 19 FY 20 FY 21 FY 22 Total
Construction/Maintenance 438,000 25,000 463,000
Total 438,000 25,000 463,000
Funding Sources FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 438,000 25,000 463,000
Total 438,000 25,000 463,000
Budget Impact/Other
Friday, May 12, 2017
221
Page 228
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
FUNDING SOURCE SUMMARY
Source FY 18 FY 19 FY 20 FY 21 FY 22 Total
Capital Asset Reserve 314,200 314,200
General Fund 233,300 1,819,000 1,634,400 1,623,300 2,319,100 7,629,100
GRAND TOTAL 547,500 1,819,000 1,634,400 1,623,300 2,319,100 7,943,300
Wednesday, May 10, 2017
223
Page 229
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
PROJECTS BY DEPARTMENT
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
Code Enforcement
1998 Ford Crown Victoria 19Veh# 11 n/a 23,800 23,800
2007 Dodge Pick Up 21Veh# 17 n/a 17,000 17,000
Code Enforcement Total 23,800 17,000 40,800
Facilities Management
2003 Dodge Van (438) 18Veh# 438 n/a 25,100 25,100
2004 Ford Van #439 20Veh# 439 3 28,800 28,800
2005 Ford F150 #433 21Veh#433 n/a 32,200 32,200
Facilities Management Total 25,100 28,800 32,200 86,100
Fire/Robbins Hose
Engine 7 - 1997 Pierce Dash Pumper FR1800 1 38,400 76,800 76,800 76,800 76,800 345,600
Ladder 1 - 2011 Pierce Quantum PUC FR1801 1 145,700 145,700 0 0 0 291,400
Engine 3 - 2003 Pierce Lance Pumper FR1900 1 76,100 76,100 76,100 76,100 304,400
Engine 6 - 2003 Pierce Lance Pumper FR2000 1 76,800 76,800 76,800 230,400
Fire/Robbins Hose Total 184,100 298,600 229,700 229,700 229,700 1,171,800
Fleet Maintenance
2001 Dodge Ram 1500 #131 19Veh #131 n/a 27,000 27,000
2003 Chevrolet 1500 HD Flat Bed #119 20Veh# 119 n/a 60,000 60,000
Fleet Maintenance Total 27,000 60,000 87,000
Permtting and Inspections
2005 Ford F150 19Veh# 13 n/a 16,000 16,000
2001 Dodge Pick Up 21Veh# 19 n/a 17,000 17,000
2001 Dodge Pick Up 21Veh# 22 n/a 17,000 17,000
Permtting and Inspections Total 16,000 34,000 50,000
Police
2010 Ford Crown Victoria PPV (203) 18Veh# 203 n/a 28,900 28,900
2002 Ford Taurus (206) 18Veh# 206 n/a 24,500 24,500
2012 Chevy Tahoe PPV (223) 18Veh# 223 n/a 28,900 28,900
2008 Ford Crown Victoria PPV (238) 18Veh# 238 n/a 28,900 28,900
2011 Ford Crown Victoria PPV (252) 18Veh# 252 n/a 28,900 28,900
2007 Ford Fusion Admin (261) 18Veh# 261 n/a 24,500 24,500
2012 Dodge Charger PPV (272) 18Veh# 272 n/a 28,900 28,900
2006 Ford Crown Victoria PPV (274) 18Veh# 274 n/a 24,500 24,500
2012 Dodge Charger PPV (276) 18Veh# 276 n/a 28,900 28,900
2005 Ford F150 Pick Up PPV (276) 18Veh# 279 n/a 28,900 28,900
2013 Ford Fusion (200) 19Veh# 200 n/a 24,500 24,500
2012 Dodge Charger PPV (205) 19Veh# 205 n/a 31,900 31,900
Wednesday, May 10, 2017
224
Page 230
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
2011 Ford Crown Victoria PPV (208) 19Veh# 208 n/a 31,900 31,900
2010 Dodge Charger PPV (209) 19Veh# 209 n/a 24,500 24,500
2000 Ford Taurus Admin (210) 19Veh# 210 n/a 24,500 24,500
2006 Dodge Charger (214) 19Veh# 214 n/a 24,500 24,500
2007 Ford Crown Victoria PPV (227) 19Veh# 227 n/a 31,900 31,900
2010 Ford Fusion Admin (231) 19Veh# 231 n/a 24,500 24,500
2000 Ford Crown Victoria PPV (234) 19Veh# 234 n/a 31,900 31,900
2010 Ford Fusion Admin (237) 19Veh# 237 n/a 24,500 24,500
2013 Dodge Charger PPV (250) 19Veh# 250 n/a 31,900 31,900
2008 Harley FLHTP (257) 19Veh# 257 n/a 23,300 23,300
2007 Ford Fusion Admin (260) 19Veh# 260 n/a 24,500 24,500
2009 HD Motorcycle FHP (266) 19Veh# 266 n/a 23,300 23,300
2011 Harley FLHTP (267) 19Veh# 267 n/a 23,300 23,300
2010 Ford Crown Victoria PPV (273) 19Veh# 273 n/a 31,900 31,900
2007 Ford Crown Victoria (280) 19Veh# 280 n/a 31,900 31,900
2010 Ford Crown Victoria PPV (285) 19Veh# 285 n/a 31,900 31,900
2011 Chev Silverado (215) 20Veh# 215 n/a 20,900 20,900
2011 Ford Fusion Admin (218) 20Veh# 218 n/a 24,500 24,500
2008 Ford Fusion Admin (221) 20Veh# 221 n/a 24,500 24,500
2011 Chevy Tahoe PPV (222) 20Veh# 222 n/a 31,900 31,900
2012 Ford Fusion Admin (225) 20Veh# 225 n/a 24,500 24,500
2011 Chevy Tahoe PPV (226) 20Veh# 226 n/a 31,900 31,900
2008 Ford Fusion Admin (230) 20Veh# 230 n/a 24,500 24,500
2012 Ford Fusion Admin (233) 20Veh# 233 n/a 24,500 24,500
2011 Ford Fusion Admin (240) 20Veh# 240 n/a 24,500 24,500
2014 Dodge Charger PPV (241) 20Veh# 241 n/a 31,900 31,900
2011 Ford Crown Victoria PPV (255) 20Veh# 255 n/a 31,900 31,900
2011 Ford Fusion Admin (286) 20Veh# 286 n/a 24,500 24,500
2012 Ford Fusion Admin (287) 20Veh# 287 n/a 24,500 24,500
2002 Dodge Ram 1500 (296) 20Veh# 296 n/a 20,900 20,900
2014 Dodge Charger (201) 21Veh# 201 n/a 24,500 24,500
2014 Dodge Charger PPV (219) 21Veh# 219 n/a 31,900 31,900
2014 Dodge Charger PPV (220) 21Veh# 220 n/a 31,900 31,900
2014 Dodge Charger PPV (232) 21Veh# 232 n/a 31,900 31,900
2010 Ford Fusion Admin (235) 21Veh# 235 n/a 24,500 24,500
2014 Dodge Charger PPV (242) 21Veh# 242 n/a 31,900 31,900
2014 Dodge Charger Admin (243) 21Veh# 243 n/a 24,500 24,500
2014 Dodge Charger Admin (249) 21Veh# 249 n/a 24,500 24,500
2014 Dodge Charger PPV (258) 21Veh# 258 n/a 31,900 31,900
2014 Dodge Charger PPV (262) 21Veh# 262 n/a 31,900 31,900
2014 Dodge Charger PPV (263) 21Veh# 263 n/a 31,900 31,900
2014 Dodge Charger PPV (264) 21Veh# 264 n/a 31,900 31,900
2014 Dodge Charger PPV (265) 21Veh# 265 n/a 31,900 31,900
2014 Dodge Charger PPV (282) 21Veh# 282 n/a 31,900 31,900
2013 Dodge Charger Admin (204) 22Veh# 204 n/a 24,500 24,500
2014 Harley FLHTP (211) 22Veh# 211 n/a 23,300 23,300
2013 Dodge Charger PPV (216) 22Veh# 216 n/a 31,900 31,900
2015 Chevy Tahoe PPV (229) 22Veh# 229 n/a 31,900 31,900
2013 Dodge Charger PPV (236) 22Veh# 236 n/a 31,900 31,900
2015 Harley FLHTP (268) 22Veh# 268 n/a 23,300 23,300
2013 Dodge Charger PPV (269) 22Veh# 269 n/a 31,900 31,900
2014 Dodge Charger (278) 22Veh# 278 n/a 24,500 24,500
2014 Dodge Charger PPV (283) 22Veh# 283 n/a 31,900 31,900
2014 Dodge Charger PPV (284) 22Veh# 284 n/a 31,900 31,900
2014 Dodge Charger PPV (290) 22Veh# 290 n/a 31,900 31,900
2015 Chevy Tahoe PPV (293) 22Veh# 293 n/a 31,900 31,900
2005 Ford E250 (295) 22Veh# 295 n/a 70,000 70,000
Wednesday, May 10, 2017
225
Page 231
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
2013 Dodge Charger (297) 22Veh# 297 n/a 31,900 31,900
Police Total 275,800 496,600 365,400 417,000 452,700 2,007,500
Public Works - Grounds
2003 Ex-Mark 52" Zero Turn Mower (568) 18Veh# 568 3 8,800 8,800
2004 Kubota Tractor w/Front Loader/Backhoe #572 18Veh# 572 3 53,700 53,700
1995 International Bucket Truck #589 19Veh#589 2 188,000 188,000
2001 Dodge Ram 2500 Truck #580 20 VEH#580 n/a 33,000 33,000
2006 Kubota Mower #581 20Veh #581 n/a 60,000 60,000
2009 Toro Mower #561 20Veh#561 n/a 60,000 60,000
1994 Vermeer Chipper #588 21Veh #588 n/a 89,000 89,000
2012 Toro Mower #562 21Veh#562 n/a 62,000 62,000
2010 Torob Zero Turn Mower w/bager 22Veh#563 n/a 12,000 12,000
1987 Case Tractor w/mower 22Veh#571 n/a 40,000 40,000
Public Works - Grounds Total 62,500 188,000 153,000 151,000 52,000 606,500
Public Works - Sanitation
2008 Intn't Rear Loader (445) 19Veh# 445 4 169,300 169,300
2010 Peterbilt Automated Trash Truck #455 19Veh# 455 3 265,800 265,800
2009 International Bulk Trash Truck #446 20Veh# 446 3 155,100 155,100
2003 Peterbilt Automated Trash Truck #444 20Veh#444 n/a 272,000 272,000
2008 Ford F150 #440 21Veh#440 n/a 32,200 32,200
2008 International Rear Loader #452 21Veh#453 n/a 172,700 172,700
2012 Kenworth Bulk Trash Truck #447 22Veh#447 n/a 178,400 178,400
2011 Peterbilt Automated Trash Truck #450 22Veh#450 n/a 332,000 332,000
2008 International Rear Loader Trash Truck #452 22Veh#452 n/a 295,000 295,000
2002 Hurst Trailer #453 22Veh#453 n/a 2,300 2,300
Public Works - Sanitation Total 435,100 427,100 204,900 807,700 1,874,800
Public Works - Streets
2001 Case Front-End Loader #316 19Veh #316 2 163,700 163,700
1992 International Dump Truck (326) 19Veh# 326 1 142,200 142,200
2003 Chevrolet Silverado 1500 #330 19Veh#330 n/a 28,000 28,000
2001 Case Front-End Loader #312 20Veh #312 2 136,200 136,200
2001 Int'l Dump Truck (322) 20Veh# 322 2 137,600 137,600
2002 Airman Air Compressor (382) 20Veh# 382 2 26,600 26,600
2002 Old Dominion Leaf Vac #361 20Veh#361 n/a 70,000 70,000
2001 Int'l Dump Truck (324) 21Veh# 324 2 140,400 140,400
2001 Case Front-End Loader 21Veh#312 n/a 175,100 175,100
2006 International Sweeper #356 21Veh#356 n/a 180,000 180,000
1969 Caterpillar Grader #301 22Veh#301 n/a 477,000 477,000
2006 Sterling Vac Track #350 22Veh#350 n/a 300,000 300,000
Public Works - Streets Total 333,900 370,400 495,500 777,000 1,976,800
Public Works Admin
2008 Toyota Camry Hybrid #6 21Veh# 6 n/a 42,000 42,000
Public Works Admin Total 42,000 42,000
GRAND TOTAL 547,500 1,819,000 1,634,400 1,623,300 2,319,100 7,943,300
Wednesday, May 10, 2017
226
Page 232
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
FUNDING SOURCE SUMMARY
Source FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water/Wastewater Fund 156,300 792,700 421,000 288,900 426,000 2,084,900
GRAND TOTAL 156,300 792,700 421,000 288,900 426,000 2,084,900
Wednesday, May 03, 2017
227
Page 233
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
PROJECTS BY DEPARTMENT
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
W/WW Engineering
2008 Dodge Avenger (427) 19Veh# 427 n/a 23,000 23,000
2008 Ford F150 Pick-Up (420) 20Veh# 420 1 32,900 32,900
2008 Dodge Avenger SE #5 21Veh#5 n/a 28,900 28,900
2013 Ford F 150 Pick up Ext Cab 4WD #418 22Veh#418 n/a 38,000 38,000
W/WW Engineering Total 23,000 32,900 28,900 38,000 122,800
Wastewater Management
2008 Case 590 Backhoe #672 (Split) 19Veh #672 n/a 59,400 59,400
2008 International Dump Truck 14' #681 (Split) 19Veh #681 n/a 78,000 78,000
2009 Chevrolet CUES Camera Truck #684 19Veh #684 5 300,000 300,000
2008 Ford 1-Ton Utility Truck with crane #665 19Veh#665 n/a 51,500 51,500
2008 Ford 1/2 Ton Utility Truck #698 (split) 19Veh#698 n/a 14,200 14,200
2006 Sidekick Easement Machine (690) 20Veh# 690 n/a 38,200 38,200
2005 Case Backhoe #682 (split) 20Veh#682 n/a 61,900 61,900
2012 Chevrolet Silverado 1500 WT #695(split) 20Veh#695 n/a 16,500 16,500
2013 Ford 1-Ton Utilty Truck with Crane #655 21Veh#655 n/a 55,000 55,000
2013 Ford 1-Ton Utility Truck with crane 21Veh#664 n/a 55,000 55,000
2013 Ford F150 Pickup Ext Cab (split) 22Veh#661 n/a 19,000 19,000
2013 Vacoon Jet Truck #692 (split) 22Veh#692 n/a 175,000 175,000
Wastewater Management Total 503,100 116,600 110,000 194,000 923,700
Water Management
1995 Caterpillar Loader #402 18Veh#402 n/a 156,300 156,300
2008 Case 590 Backhoe #672 (Split) 19Veh #672-1 n/a 59,400 59,400
2008 International Dump Truck 14' #681 (Split) 19Veh #681-1 n/a 78,000 78,000
2009 Wacker RT820 Vibratory Trench Roller #401 19Veh#401 n/a 36,900 36,900
2008 Ford 1/2 Ton Utility Truck #698 (split) 19Veh#698-2 n/a 14,200 14,200
2005 Case Backhoe #682 (Split) 20Veh# 682 n/a 61,900 61,900
2012 Ford F250 Super Duty XL #403 20Veh#403 n/a 40,000 40,000
2008 Ingersoll Air Compressor #407 20Veh#407 n/a 30,800 30,800
2012 Ford F250 Super Duty XL #426 20Veh#426 n/a 40,000 40,000
2012 Chevrolet Silverado 1500 WT #695 (split) 20Veh#695-2 n/a 16,500 16,500
1995 Caterpillar Excavator #400 21Veh#400 n/a 125,000 125,000
1997 Kruger Trailer #415 21Veh#415 n/a 25,000 25,000
2013 Ford F150 Pickup Ext. Cab #661n (split) 22Veh#661-2 n/a 19,000 19,000
2013 Vaccon Jet Truck #692 (split) 22Veh#692-2 n/a 175,000 175,000
Water Management Total 156,300 188,500 189,200 150,000 194,000 878,000
Water Treatment Plant
2007 Kohler Generator Trailer Mounted (604) 19Veh# 604 n/a 50,000 50,000
2008 GMC Cargo Van (662) 19Veh# 662 n/a 28,100 28,100
2010 Ford 1-Ton Utility Truck w/ Gate 3620 20Veh# 620 n/a 56,300 56,300
2011 Ford Ranger #621 20Veh#621 n/a 26,000 26,000
Wednesday, May 03, 2017
228
Page 234
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
Water Treatment Plant Total 78,100 82,300 160,400
GRAND TOTAL 156,300 792,700 421,000 288,900 426,000 2,084,900
Wednesday, May 03, 2017
229
Page 235
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
FUNDING SOURCE SUMMARY
Source FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Revenue 335,500 493,500 425,000 310,000 330,000 1,894,000
GRAND TOTAL 335,500 493,500 425,000 310,000 330,000 1,894,000
Wednesday, May 03, 2017
230
Page 236
City of Dover, Delaware
FY 2018 Capital Investment Plan
FY 18 thru FY 22
PROJECTS BY DEPARTMENT
Department Project # Priority FY 18 FY 19 FY 20 FY 21 FY 22 Total
Electric Engineering
2008 Dodge Avenger (7) Veh# 007 n/a 25,000 25,000
2007 Dodge Pickup (9) Veh# 009 n/a 33,000 33,000
2008 Ford Escape Veh#701 n/a 30,000 30,000
Electric Engineering Total 63,000 25,000 88,000
Electric T & D
2006 Terex Backhoe (#722) Veh #722 n/a 130,000 130,000
1995 Case Backhoe (733) Veh #733 1 105,000 105,000
2004 International Altec Aerial Device Veh #751 1 150,000 150,000
2002 Chevrolet Dump Truck Veh #753 1 150,000 150,000
2006 International Bucket Truck Veh #759 1 160,000 160,000
2007 Dodge Pick Up Veh #771 1 33,000 33,000
2008 International Dueco Line Truck Veh #772 1 250,000 250,000
2001 Freightliner Knuckleboom Veh #776 1 251,400 251,400
2008 Ford Dump F350 (796) Veh #796 1 51,100 51,100
2001 Freightliner (750) Veh# 750 1 300,000 300,000
2005 Ford Pick Up Truck Veh# 770 1 25,500 25,500
Digger Derrick Veh#718 n/a 200,000 200,000
Electric T & D Total 335,500 430,500 400,000 310,000 330,000 1,806,000
GRAND TOTAL 335,500 493,500 425,000 310,000 330,000 1,894,000
Wednesday, May 03, 2017
231
Page 238
FY 2018 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
City of Dover, Delaware
Computation of Legal Debt Margin
General Obligation Bonds
(amounts expressed in thousands)
Estimated Estimated
2018 2017 2016 2015 2014 2013 2012
Debt Limit $ 154,538 $ 152,627 $ 155,396 $ 158,485 $ 157,995 $ 159,075 $ 158,465
Net (Taxable) Assessed Value on Books 3,090,754 3,052,549 3,107,912 3,169,707 3,159,894 3,181,496 3,169,308
Total net debt applicable to limit 5,877 6,210 6,783 7,337 4,050 4,479 1,550
Legal Debt Margin $ 148,661 $ 146,417 $ 148,613 $ 151,148 $ 153,945 $ 154,596 $ 156,915
Total Net Debt applicable to limit
as a percentage of debt limit 3.80% 4.07% 4.36% 4.63% 2.56% 2.82% 0.98%
Legal Debt Margin Calculation for Fiscal Year 2017
Net (Taxable) Assessed Value on Books $ 3,090,754 $ 3,052,549 $ 3,107,912 $ 3,169,707 $ 3,159,894 $ 3,181,496 $ 3,169,308
Debt Limit - 5 Percent of Total Assessed Value $ 154,538 $ 152,627 $ 155,396 $ 158,485 $ 157,995 $ 159,075 $ 158,465
DEBT
(For which the City's full faith and credit has been pledged)
Gross Bonded Debt 5,877 6,210 6,783 7,337 4,050 4,479 1,550
LEGAL DEBT MARGIN $ 148,661 $ 146,417 $ 148,613 $ 151,148 $ 153,945 $ 154,596 $ 156,915
IMPORTANT NOTE: The Total Net Debt applicable to the debt limit includes the remaining Series 2014 A Bonds (PNC) and the 2012 Bonds (PNC)
Source: City of Dover Financial Reports, City of Dover Charter, Section 50(b), and Tax Assessor's Office
New Bonds without referendum cannot exceed 1/4 of 1% of taxable assessed value and shall not cause the total aggregate principal outstanding at any one time to
exceed 1% of total taxable assessment for a general tax at the time of issue or $7,726,900 based on the 2018 Estimate.
233
Page 239
FY 2018 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
City of Dover
General Fund
Projected Debt Service
2012 $3,660,000 Green Energy
Fiscal Year Total Debt Net Debt
Tax- Exempt 2014 Series A Debt Service
Ending Service Service
Loan (1) Bonds Contribution
6/30/2018 (2) $ 224,700 $ 204,000 $ 428,700 $ (98,500) $ 330,200
6/30/2019 224,700 204,000 428,700 (98,500) 330,200
6/30/2020 224,700 204,000 428,700 (98,500) 330,200
6/30/2021 224,700 204,000 428,700 (98,500) 330,200
6/30/2022 224,700 204,000 428,700 (98,500) 330,200
6/30/2023 224,700 204,000 428,700 (98,500) 330,200
6/30/2024 224,700 204,000 428,700 (98,500) 330,200
6/30/2025 224,700 204,000 428,700 (98,500) 330,200
6/30/2026 224,700 204,000 428,700 (98,500) 330,200
6/30/2027 224,700 204,000 428,700 (98,500) 330,200
6/30/2028 224,700 204,000 428,700 (98,500) 330,200
6/30/2029 224,700 204,000 428,700 (98,500) 330,200
6/30/2030 224,700 204,000 428,700 (98,500) 330,200
6/30/2031 224,700 204,000 428,700 (98,500) 330,200
6/30/2032 224,700 204,000 428,700 (98,500) 330,200
6/30/2033 205,800 204,000 409,800 (98,500) 311,300
6/30/2034 - 204,000 204,000 - 204,000
6/30/2035 - 204,000 204,000 - 204,000
Totals $ 3,576,300 $ 3,672,000 $ 7,248,300 $ (1,576,000) $ 5,672,300
Library & Garrison Farm Library
Streets & Equipment
(1) Annual Debt Service for the 2012 Loan does not reflect any reduction for the sale of the current Library
(2) Does not inlcude new debt service for the Meeting House Branch storm water or Schutte Park redevelopment projects
in the FY18 Capital Plan; The City Manager is working on obtaining other funding sources for partial financing.
234
Page 240
FY 2018 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
City of Dover
Water/Wastewater Revenue Bonds
Current Debt Service - Table 1
Series 2013
Series 2013 Revenue Total
Fiscal Year Series 2000 Series 2009 Series 2010 Series 2011 Revenue Bonds - Total Water Wastewater Total Debt
Ending Wastewater Wastewater Water Wastewater Bonds - Water Wastewater Debt Service Debt Service Service
6/30/2018 $ 53,000 $ 347,100 $ 161,300 $ 58,200 $ 355,800 $ 151,800 $ 517,100 $ 610,100 $ 1,127,200
6/30/2019 53,000 347,100 161,300 58,200 359,100 153,100 520,400 611,400 1,131,800
6/30/2020 53,000 347,100 161,300 58,200 355,100 151,400 516,400 609,700 1,126,100
6/30/2021 - 347,100 161,300 58,200 357,900 152,600 519,200 557,900 1,077,100
6/30/2022 - 347,100 161,300 58,200 356,900 152,200 518,200 557,500 1,075,700
6/30/2023 - 347,100 161,300 58,200 355,700 151,700 517,000 557,000 1,074,000
6/30/2024 - 347,100 161,300 58,200 357,700 152,600 519,000 557,900 1,076,900
6/30/2025 - 347,100 161,300 58,200 214,400 91,500 375,700 496,800 872,500
6/30/2026 - 347,100 161,300 58,200 213,300 91,000 374,600 496,300 870,900
6/30/2027 - 347,100 161,300 58,200 211,800 90,300 373,100 495,600 868,700
6/30/2028 - 347,100 161,300 58,200 213,300 91,000 374,600 496,300 870,900
6/30/2029 - 347,100 161,300 58,200 214,000 91,300 375,300 496,600 871,900
6/30/2030 - 347,100 161,300 58,200 214,000 91,300 375,300 496,600 871,900
6/30/2031 - 347,100 80,700 58,200 214,400 91,500 295,100 496,800 791,900
6/30/2032 - 173,600 - 29,100 213,200 90,900 213,200 293,600 506,800
6/30/2033 - - - - 212,300 90,600 212,300 90,600 302,900
6/30/2034 - - - - 211,100 90,000 211,100 90,000 301,100
Total $ 159,000 $ 5,033,000 $ 2,177,600 $ 843,900 $ 4,630,000 $ 1,974,800 $ 6,807,600 $ 8,010,700 $ 14,818,300
235
Page 241
FY 2018 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
City of Dover
Water/Wastewater Revenue Bonds
Projected Debt Service - Table 2
New State of Delaware Revolving Fund Loans
Total Tables 1 & 2
Fiscal Year Series 2017 Series 2017 Series 2018 Series 2019 Total Water Wastewater Total Debt
Ending Water Wastewater Wastewater Wastewater Debt Service Debt Service Service
6/30/2018 146,200 53,900 12,100 - 146,200 66,000 $ 1,339,400
6/30/2019 146,200 53,900 24,200 12,500 146,200 90,600 $ 1,368,600
6/30/2020 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,375,300
6/30/2021 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,326,300
6/30/2022 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,324,900
6/30/2023 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,323,200
6/30/2024 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,326,100
6/30/2025 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,121,700
6/30/2026 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,120,100
6/30/2027 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,117,900
6/30/2028 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,120,100
6/30/2029 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,121,100
6/30/2030 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,121,100
6/30/2031 146,200 53,900 24,200 24,900 146,200 103,000 $ 1,041,100
6/30/2032 146,200 53,900 24,200 24,900 146,200 103,000 $ 756,000
6/30/2033 146,200 53,900 24,200 24,900 146,200 103,000 $ 552,100
6/30/2034 146,200 53,900 24,200 24,900 146,200 103,000 $ 550,300
6/30/2035 146,200 53,900 24,200 24,900 146,200 103,000 $ 249,200
6/30/2036 146,200 53,900 24,200 24,900 146,200 103,000 $ 249,200
6/30/2037 73,100 26,900 24,200 24,900 73,100 76,000 $ 149,100
6/30/2038 - - 12,100 24,900 - 37,000 $ 37,000
6/30/2039 - - - 12,400 - 12,400 $ 12,400
Total $ 2,850,900 $ 1,051,000 $ 484,000 $ 498,000 $ 2,850,900 $ 2,033,000 $ 19,702,200
236
Page 242
FY 2018 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
City of Dover
Electric Revenue Fund
Projected Debt Service
Electric Revenue Fund
Fiscal Year 2008 Revenue Bonds Total Debt
6/30/2018 730,000 883,954 1,613,954
6/30/2019 765,000 847,454 1,612,454
6/30/2020 800,000 815,706 1,615,706
6/30/2021 840,000 781,706 1,621,706
6/30/2022 880,000 746,006 1,626,006
6/30/2023 925,000 707,506 1,632,506
6/30/2024 970,000 665,881 1,635,881
6/30/2025 1,015,000 622,231 1,637,231
6/30/2026 1,065,000 576,555 1,641,555
6/30/2027 1,120,000 527,300 1,647,300
6/30/2028 1,175,000 475,500 1,650,500
6/30/2029 1,230,000 416,750 1,646,750
6/30/2030 1,290,000 355,250 1,645,250
6/30/2031 1,355,000 290,750 1,645,750
6/30/2032 1,420,000 223,000 1,643,000
6/30/2033 1,485,000 152,000 1,637,000
6/30/2034 1,555,000 77,750 1,632,750
Total $ 18,620,000 $ 9,165,299 $ 27,785,299
237
Page 245
FY 2018 Annual Operating Budget—Dover, Delaware
Mayor
Fiscal Year 2018 Organizational Chart
Citizens of Dover
Mayor
Police
Department
*Economic Development was dissolved in FY17
240
Page 246
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
MAYOR
110-3200-519
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 45,346 $ 45,000 $ 45,000 $ 45,000 $ 45,000 $ - 0%
10-14 FICA TAXES 3,255 3,400 3,400 3,400 3,400 - 0%
10-15 HEALTH INSURANCE 7,992 8,500 8,500 8,500 8,500 - 0%
10-16 L I D INSURANCE 334 300 300 300 300 - 0%
10-17 WORKERS COMPENSATION 147 100 100 100 100 - 0%
PERSONNEL COSTS 57,074 57,300 57,300 57,300 57,300 - 0%
20-22 OFFICE SUPPLIES 82 100 100 100 100 - 0%
20-23 PRINTING AND DUPLICATING 56 200 200 200 200 - 0%
MATERIALS & SUPPLIES 138 300 300 300 300 - 0%
30-21 TELEPHONE/FAX 392 500 500 500 500 - 0%
30-25 ADVERTISEMENT 1,439 1,500 1,500 1,500 1,500 - 0%
30-27 SUBSCRIPTIONS AND DUES 175 3,500 3,500 3,500 3,500 - 0%
30-35 COMMUNITY RELATIONS EXP 10,226 5,500 5,500 5,500 5,500 - 0%
30-37 OTHER EXPENSES 5,416 5,000 5,000 5,000 5,000 - 0%
30-62 GASOLINE - 300 300 200 200 - -33%
30-63 AUTO REPAIRS/MAINTENANCE - 100 100 100 100 - 0%
ADMINISTRATIVE EXPENDITURES 17,648 16,400 16,400 16,300 16,300 - -1%
OPERATING EXPENDITURES 74,861 74,000 74,000 73,900 73,900 - 0%
TOTAL EXPENDITURES $ 74,861 $ 74,000 $ 74,000 $ 73,900 $ 73,900 $ - 0%
REVENUES
GENERAL FUND $ 74,861 $ 74,000 $ 74,000 $ 73,900 $ 73,900 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 1.0 1.0 1.0 1.0 1.0
241
Page 247
FY 2018 Annual Operating Budget—Dover, Delaware
City Council
Fiscal Year 2018 Organizational Chart
CITIZENS OF DOVER
MAYOR AND COUNCIL
At-Large
Timothy A. Slavin
1st District 2nd District
Councilman Councilman
Matthew J. Lindell William F. Hare
Councilman Councilman
Tanner Wm. Polce Brian E. Lewis
3rd District 4th District
Councilman Councilman
Scott W. Cole David L. Anderson
Councilman Councilman
Fred A. Neil Roy Sudler, Jr.
updated: 5/19/2017
242
Page 248
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY COUNCIL
110-1200-512
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-13 TEMPORARY HELP $ 76,756 $ 84,300 $ 84,300 $ 84,300 $ 84,300 $ - 0%
10-14 FICA TAXES 5,872 6,400 6,400 6,400 6,400 - 0%
10-17 WORKERS COMPENSATION 248 300 300 300 300 - 0%
PERSONNEL COSTS 82,875 91,000 91,000 91,000 91,000 - 0%
20-22 OFFICE SUPPLIES 33 - - - - - 0%
20-23 PRINTING AND DUPLICATING 95 300 300 300 300 - 0%
20-38 COMPUTER HARDWARE - - - - 1,000 - 0%
MATERIALS & SUPPLIES 128 300 300 300 1,300 - 333%
30-21 TELEPHONE/FAX 183 200 200 200 200 - 0%
30-27 SUBSCRIPTIONS AND DUES 11,293 11,500 11,500 11,500 11,500 - 0%
30-29 CONSULTING SERVICES - - - - 10,000 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 813 9,600 9,600 9,600 9,600 - 0%
30-35 COMMUNITY RELATIONS EXP 3,973 3,500 3,500 3,500 3,500 - 0%
30-37 DISCRETIONARY FUNDS - 22,000 22,000 25,000 25,000 - 14%
30-92 HRC-OFFICE SUPPLIES 865 3,000 3,000 3,000 3,000 - 0%
ADMINISTRATIVE EXPENDITURES 17,126 49,800 49,800 52,800 62,800 - 26%
OPERATING EXPENDITURES 100,129 141,100 141,100 144,100 155,100 - 10%
TOTAL EXPENDITURES $ 100,129 $ 141,100 $ 141,100 $ 144,100 $ 155,100 $ - 10%
REVENUES
GENERAL FUND $ 100,129 $ 141,100 $ 141,100 $ 144,100 $ 155,100 $ -
PERSONNEL
PP/COUNCIL 9.0 9.0 9.0 9.0 9.0
PP/TEMP COMMITTEES 8.0 8.0 8.0 8.0 8.0
243
Page 249
FY 2018 ANNUAL OPERATING BUDGET – DOVER, DELAWARE
City Manager
Fiscal Year 2018 Organization Chart
CITY COUNCIL
CITY MANAGER*
1
Assistant City Manager
1 HUMAN RESOURCES
CUSTOMER INFORMATION
LIBRARY
SERVICE TECHNOLOGY
PUBLIC WORKS
Public Affairs & Emergency
Management Coordinator
1
Administrative Assistant
ELECTRIC
1
*Appointed by Council
244
Page 250
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY MANAGER
110-2100-515
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 353,732 $ 351,500 $ 355,200 $ 351,500 $ 386,000 $ - 10%
10-12 OVERTIME 1,192 2,000 2,000 2,000 1,500 - -25%
10-13 TEMPORARY 10,806 11,500 11,500 11,500 - - -100%
10-14 FICA TAXES 26,117 27,900 28,200 27,000 29,600 - 6%
10-15 HEALTH INSURANCE 47,538 52,500 52,500 48,200 61,400 - 17%
10-16 L I D INSURANCE 1,917 2,000 2,000 2,000 2,300 - 15%
10-17 WORKERS COMPENSATION 1,185 1,700 1,700 1,100 1,300 - -24%
10-19 PENSION 20,361 20,700 20,700 20,700 23,200 - 12%
10-20 OPEB 40,154 33,500 33,500 47,300 52,900 - 58%
PERSONNEL COSTS 503,003 503,300 507,300 511,300 558,200 - 11%
20-22 OFFICE SUPPLIES 666 700 700 700 700 - 0%
20-23 PRINTING AND DUPLICATING 2,834 3,300 3,300 3,300 2,900 - -12%
20-26 PROGRAM EXPENSES/SUPPLIES 1,800 1,800 1,800 8,900 8,900 - 394%
20-37 COMPUTER SOFTWARE - - 300 300 - - 0%
20-38 COMPUTER HARDWARE - 2,600 2,600 1,300 1,300 - -50%
MATERIALS & SUPPLIES 5,300 8,400 8,700 14,500 13,800 - 64%
30-21 TELEPHONE/FAX 644 800 800 800 800 - 0%
30-27 SUBSCRIPTIONS AND DUES 4,182 4,500 4,500 4,500 3,800 - -16%
30-28 TRAINING/CONF/FOOD/TRAVEL 3,229 2,200 2,200 2,200 2,200 - 0%
30-31 CONTRACTUAL SERVICES 94,895 5,000 5,000 - - - -100%
30-32 LEGAL EXPENSES 304,361 159,000 153,700 150,000 150,000 - -6%
30-35 COMMUNITY RELATIONS EXP 1,559 200 5,200 200 200 - 0%
30-37 OTHER EXPENSES - 90,400 89,400 - - - -100%
30-62 GASOLINE 28 100 100 100 - - -100%
30-91 ECONOMIC DEVELOPMENT - 18,500 18,500 18,500 18,500 - 0%
ADMINISTRATIVE EXPENDITURES 408,898 280,700 279,400 176,300 175,500 - -37%
OPERATING EXPENDITURES 917,201 792,400 795,400 702,100 747,500 - -6%
40-22 AUTOMOBILES - PURCHASE - - 17,800 - - - 0%
40-31 CONSTRUCTION - PURCHASE - - 434,600 - - -
CAPITAL OUTLAY - - 452,400 - - - 0%
TOTAL EXPENDITURES $ 917,201 $ 792,400 $ 1,247,800 $ 702,100 $ 747,500 $ - -6%
REVENUES
GENERAL FUND $ 917,201 $ 792,400 $ 795,400 $ 702,100 $ 747,500 $ -
GOV. CAPITAL PROJECT FUND - - 452,400 - - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 4.0 4.0 4.0 4.0 5.0
BUDGETED PART-TIME POSITIONS 4.0 4.0 4.0 4.0 -
245
Page 251
FY 2018 ANNUAL OPERATING BUDGET – DOVER, DELAWARE
City Clerk
Fiscal Year 2018 Organizational Chart
CITY COUNCIL
CITY CLERK
CITY CLERK, DIRECTOR OF COUNCIL AFFAIRS AND
CONSTITUENT SERVICES/ASSISTANT TREASURER*
1
ASSISTANT CITY CLERK, DEPUTY
DIRECTOR OF COUNCIL AFFAIRS &
CONSTITUENT SERVICES/ASSISTANT
TREASURER*
1
ASSISTANT TO THE DIRECTOR OF
COUNCIL AFFAIRS & CONSTITUENT
SERVICES
1
ADMINISTRATIVE ASSISTANT
1
*Appointed by Council
246
Page 252
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY CLERK
110-1100-511
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 222,136 $ 228,300 $ 231,900 $ 228,300 $ 228,300 $ - 0%
10-14 FICA TAXES 16,525 17,500 17,800 17,500 17,500 - 0%
10-15 HEALTH INSURANCE 35,977 42,800 42,800 41,600 41,600 - -3%
10-16 L I D INSURANCE 1,475 1,600 1,600 1,600 1,600 - 0%
10-17 WORKERS COMPENSATION 720 700 700 700 700 - 0%
10-19 PENSION 43,869 59,800 59,800 61,400 61,400 - 3%
10-20 OPEB 25,585 22,100 22,100 31,300 31,300 - 42%
PERSONNEL COSTS 346,287 372,800 376,700 382,400 382,400 - 3%
20-22 OFFICE SUPPLIES 1,081 1,400 1,400 2,200 2,200 - 57%
20-23 PRINTING AND DUPLICATING 2,031 2,700 2,700 2,700 2,700 - 0%
20-37 COMPUTER SOFTWARE 507 500 500 1,100 2,700 - 440%
20-38 COMPUTER HARDWARE - 4,600 4,600 9,000 4,600 - 0%
MATERIALS & SUPPLIES 3,619 9,200 9,200 15,000 12,200 - 33%
30-21 TELEPHONE/FAX 490 500 500 500 500 - 0%
30-25 ADVERTISEMENT 996 1,000 1,000 1,000 1,000 - 0%
30-27 SUBSCRIPTIONS AND DUES 735 700 700 500 500 - -29%
30-28 TRAINING/CONF/FOOD/TRAVEL 3,569 2,900 2,900 8,000 1,300 - -55%
30-31 CONTRACTUAL SERVICES 11,638 15,000 15,000 31,500 31,500 - 110%
30-34 ELECTION RELATED EXPENSES 194 9,200 9,200 200 200 - -98%
30-61 OFF EQUIP/REPAIRS & MAINT 2,572 1,000 1,000 300 300 - -70%
ADMINISTRATIVE EXPENDITURES 20,195 30,300 30,300 42,000 35,300 - 17%
OPERATING EXPENDITURES 370,101 412,300 416,200 439,400 429,900 - 4%
40-25 OTHER EQUIP - PURCHASE - - 155,400 - - - 0%
CAPITAL OUTLAY - - 155,400 - - - 0%
TOTAL EXPENDITURES $ 370,101 $ 412,300 $ 416,200 $ 439,400 $ 429,900 $ - 4%
REVENUES
GENERAL FUND $ 370,101 $ 412,300 $ 416,200 $ 439,400 $ 429,900 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 4.0 4.0 4.0 4.0 4.0
247
Page 253
FY 2018 ANNUAL OPERATING BUDGET – DOVER, DELAWARE
Customer Service
Fiscal Year 2018 Organization Chart
CITY MANAGER
ASSISTANT CITY
MANAGER
CUSTOMER SERVICE
Customer Service Director
1
Office Assistant
1
BILLING / COLLECTIONS CUSTOMER SERVICES
Billing Supervisor – Full-Time Customer Services Supervisor – Full-Time
1 1
Account Clerk II – Full-Time Account Clerk I – (3) Full-Time
2 Account Clerk II – (3) Full-Time
Account Clerk II – Full-Time Account Clerk II – Part-Time (Call Center)
1 2
CASHIERS METER READING
Account Clerk III – Full-Time Field Service Representative III – Full-Time
1 1
Account Clerk II – Full-Time Field Service Representative II – Full-Time
3 4
248
Page 254
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CUSTOMER SERVICES
110-2900-529
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 548,364 $ 556,100 $ 618,100 $ 658,600 $ 638,100 $ - 15%
10-12 OVERTIME 123 - - - - - 0%
10-13 TEMPORARY HELP 46,658 82,700 82,700 39,100 39,100 - -53%
10-14 FICA TAXES 43,820 48,800 57,500 53,300 51,800 - 6%
10-15 HEALTH INSURANCE 123,999 133,700 157,200 184,900 168,100 - 26%
10-16 L I D INSURANCE 3,038 3,200 3,200 3,800 3,700 - 16%
10-17 WORKERS COMPENSATION 1,928 2,100 2,500 2,300 2,200 - 5%
10-19 PENSION 139,540 196,700 202,600 122,200 121,000 - -38%
10-20 OPEB 63,116 53,900 53,900 90,200 87,400 - 62%
PERSONNEL COSTS 970,586 1,077,200 1,177,700 1,154,400 1,111,400 - 3%
20-21 FURNITURE/FIXTURES 378 400 400 400 400 - 0%
20-22 OFFICE SUPPLIES 12,897 13,600 13,600 13,700 13,600 - 0%
20-23 PRINTING AND DUPLICATING 14,914 15,000 15,000 15,000 15,000 - 0%
20-37 COMPUTER SOFTWARE 10 300 300 500 - - -100%
20-38 COMPUTER HARDWARE 11,417 3,300 3,300 6,200 3,300 - 0%
MATERIALS & SUPPLIES 39,615 32,600 32,600 35,800 32,300 - -1%
30-21 TELEPHONE/FAX 4,506 5,100 5,100 5,200 5,100 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 1,000 1,000 1,000 2,500 1,000 - 0%
30-31 CONTRACTUAL SERVICES 12,321 12,500 12,500 12,500 1,000 - -92%
30-61 OFF EPUIP/REPAIRS & MAINT 9,858 15,400 15,400 15,400 15,400 - 0%
ADMINISTRATIVE EXPENDITURES 27,685 34,000 34,000 35,600 22,500 - -34%
OPERATING EXPENDITURES 1,037,886 1,143,800 1,244,300 1,225,800 1,166,200 - 2%
TOTAL EXPENDITURES $ 1,037,886 $ 1,143,800 $ 1,244,300 $ 1,225,800 $ 1,166,200 $ - 2%
REVENUES
GENERAL FUND $ 1,037,886 $ 1,143,800 $ 1,244,300 $ 1,225,800 $ 1,166,200 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 14.0 13.0 18.0 17.0 16.0
BUDGETED PART-TIME POSITIONS 4.0 4.0 2.0 2.0 2.0
249
Page 255
FY 2018 ANNUAL OPERATING BUDGET – DOVER, DELAWARE
Finance
Fiscal Year 2018 Organizational Chart
CITY COUNCIL
Controller/Treasurer*
1
PROCUREMENT/
FINANCE
INVENTORY
Assistant Controller/Treasurer Contract & Procurement Manager
1 1
Payroll Specialist Storekeeper/Buyer II
1 2
Account Clerk II
1 Mail Clerk
1
Financial Reporting & Accounting
Manager
1
Accountant II
2
Administrative Assistant
1
* Appointed by Council
250
Page 256
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FINANCE
110-2300-517
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 518,474 $ 515,800 $ 520,700 $ 517,200 $ 517,200 $ - 0%
10-12 OVERTIME 12 - - - - - 0%
10-14 FICA TAXES 37,031 39,400 39,800 39,500 39,500 - 0%
10-15 HEALTH INSURANCE 95,736 104,000 104,000 99,900 99,900 - -4%
10-16 L I D INSURANCE 2,734 2,900 2,900 3,000 3,000 - 3%
10-17 WORKERS COMPENSATION 1,680 1,700 1,700 1,700 1,700 - 0%
10-18 EDUCATIONAL ASSISTANCE 4,640 - 1,200 - - - 0%
10-19 PENSION 74,700 97,800 97,800 101,000 101,000 - 3%
10-20 OPEB 59,825 50,000 50,000 70,900 70,900 - 42%
PERSONNEL COSTS 794,832 811,600 818,100 833,200 833,200 - 3%
20-22 OFFICE SUPPLIES 690 800 800 800 700 - -13%
20-23 PRINTING AND DUPLICATING 2,598 1,900 1,900 2,200 2,200 - 16%
20-38 COMPUTER HARDWARE - - - 2,600 1,300 - 0%
MATERIALS & SUPPLIES 3,288 2,700 2,700 5,600 4,200 - 56%
30-21 TELEPHONE/FAX 1,380 1,400 1,400 1,900 1,900 - 36%
30-25 ADVERTISEMENT 171 200 200 300 200 - 0%
30-27 SUBSCRIPTIONS AND DUES 1,463 1,200 1,200 1,200 1,200 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 2,556 2,200 2,200 5,000 2,500 - 14%
30-31 CONTRACTUAL SERVICES 173,659 188,100 188,100 187,200 182,200 - -3%
30-61 OFF EQUIP/REPAIRS & MAINT 2,200 3,700 3,700 3,700 3,700 - 0%
ADMINISTRATIVE EXPENDITURES 181,429 196,800 196,800 199,300 191,700 - -3%
OPERATING EXPENDITURES 979,550 1,011,100 1,017,600 1,038,100 1,029,100 - 2%
TOTAL EXPENDITURES $ 979,550 $ 1,011,100 $ 1,017,600 $ 1,038,100 $ 1,029,100 $ - 2%
REVENUES
GENERAL FUND $ 979,550 $ 1,011,100 $ 1,017,600 $ 1,038,100 $ 1,029,100 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 8.0 8.0 8.0 8.0 8.0
BUDGETED PART-TIME POSITIONS 1.0 - - - -
251
Page 257
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PROCUREMENT & INVENTORY
110-2700-571
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 162,890 $ 165,800 $ 165,800 $ 168,700 $ 168,700 $ - 2%
10-12 OVERTIME 489 1,000 1,000 1,000 1,000 - 0%
10-13 TEMPORARY HELP 10,658 21,400 21,400 22,500 22,500 - 5%
10-14 FICA TAXES 13,091 14,400 14,400 14,700 14,700 - 2%
10-15 HEALTH INSURANCE 14,680 15,700 15,700 15,700 15,700 - 0%
10-16 L I D INSURANCE 899 1,000 1,000 1,000 1,000 - 0%
10-17 WORKERS COMPENSATION 3,313 6,100 6,100 6,900 6,900 - 13%
10-18 EDUCATIONAL ASSISTANCE 5,739 - - - - - 0%
10-19 PENSION 51,986 72,500 72,500 76,400 76,400 - 5%
10-20 OPEB 19,044 16,100 16,100 23,100 23,100 - 43%
PERSONNEL COSTS 282,788 314,000 314,000 330,000 330,000 - 5%
20-21 FURNITURE/FIXTURES - 300 300 300 - - -100%
20-22 OFFICE SUPPLIES 214 400 400 300 300 - -25%
20-23 PRINTING AND DUPLICATING 3,511 3,600 3,600 3,600 3,600 - 0%
20-26 PROGRAM EXPENSES/SUPPLIES 992 1,000 1,000 1,000 1,000 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 634 900 900 900 900 - 0%
20-31 BOOKS - - - 300 - - 0%
20-32 SECURITY/SAFETY MATERIALS - 500 500 500 500 - 0%
20-37 COMPUTER SOFTWARE 50 200 200 200 - - -100%
20-38 COMPUTER HARDWARE 516 1,800 1,800 2,200 1,800 - 0%
20-46 CITY BLDG MAINT SUPPLIES 12,714 2,200 2,200 4,900 4,900 - 123%
20-58 WATER/SEWER 2,271 3,000 3,000 3,000 3,000 - 0%
MATERIALS & SUPPLIES 20,902 13,900 13,900 17,200 16,000 - 15%
30-21 TELEPHONE/FAX 1,395 1,400 1,400 1,400 1,400 - 0%
30-22 POSTAGE 148,931 150,000 150,000 150,000 150,000 - 0%
30-23 ELECTRICITY 62,439 65,000 65,000 65,000 64,000 - -2%
30-24 HEATING OIL/GAS 28 100 100 100 100 - 0%
30-25 ADVERTISEMENT 2,909 2,500 2,500 2,500 2,500 - 0%
30-27 SUBSCRIPTIONS AND DUES 515 600 600 700 700 - 17%
30-28 TRAINING/CONF/FOOD/TRAVEL 250 2,700 2,700 1,600 1,000 - -63%
30-31 CONTRACTUAL SERVICES 18,566 24,500 24,500 25,300 26,300 - 7%
30-43 ENVIRONMENTAL EXPENSES 2,580 3,500 3,500 3,500 3,500 - 0%
30-61 OFF EPUIP/REPAIRS & MAINT 4,534 5,000 5,000 5,000 5,000 - 0%
30-62 GASOLINE 1,208 1,500 1,500 1,500 1,500 - 0%
30-66 OTHER EPUIP REPAIRS/MAINT 519 200 200 300 300 - 50%
30-67 RADIO REPAIRS/MAINTENANCE 83 200 200 200 200 - 0%
ADMINISTRATIVE EXPENDITURES 243,958 257,200 257,200 257,100 256,500 - 0%
OPERATING EXPENDITURES 547,648 585,100 585,100 604,300 602,500 - 3%
TOTAL EXPENDITURES $ 547,648 $ 585,100 $ 585,100 $ 604,300 $ 602,500 $ - 3%
REVENUES
GENERAL FUND $ 547,648 $ 585,100 $ 585,100 $ 604,300 $ 602,500 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 3.0 3.0 3.0 3.0 3.0
BUDGETED PART-TIME POSITIONS 1.0 1.0 1.0 1.0 1.0
252
Page 258
FY 2018 Annual Operatin g Budget —Dover, Delaware
Dover Fire Department
Fiscal Year 2018 Organizational Chart
CITY COUNCIL
DOVER FIRE DEPARTMENT
Fire Chief
Deputy Fire Chief Fire Chief’s Assistant
1 (Volunteer) 1 P/T
Assistant Fire Chief Fire Dispatcher
4 (Volunteer) 5 F/T
Fire Line Captain
2 (Volunteer)
253
Page 259
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FIRE DEPARTMENT
110-1400-514
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 160,598 $ 208,100 $ 186,300 $ 215,100 $ 215,100 $ - 3%
10-12 OVERTIME 32,036 43,000 43,000 35,000 35,000 - -19%
10-13 TEMPORARY HELP 47,557 37,100 42,900 25,000 25,000 - -33%
10-14 FICA TAXES 18,138 22,000 22,000 20,900 21,000 - -5%
10-15 HEALTH INSURANCE 34,947 39,000 39,000 45,800 45,800 - 17%
10-16 L I D INSURANCE 913 1,100 1,100 1,100 1,100 - 0%
10-17 WORKERS COMPENSATION 773 900 900 900 900 - 0%
10-19 PENSION 39,512 66,400 66,400 69,100 69,100 - 4%
10-20 OPEB 20,505 20,100 20,100 29,400 29,400 - 46%
PERSONNEL COSTS 354,979 437,700 421,700 442,300 442,400 - 1%
30-28 TRAINING/CONF/FOOD/TRAVEL - 1,000 1,000 1,000 1,000 - 0%
30-31 CONTRACTUAL SERVICES 332,500 283,000 299,000 366,500 331,500 - 17%
ADMINISTRATIVE EXPENDITURES 332,500 284,000 300,000 367,500 332,500 - 17%
OPERATING EXPENDITURES 687,479 721,700 721,700 809,800 774,900 - 7%
40-25 OTHER EQUIP - PURCHASE 445,594 145,700 145,700 184,100 184,100 - 26%
40-31 CONSTRUCTION - PURCHASE - - - - - - 0%
CAPITAL OUTLAY 445,594 145,700 145,700 184,100 184,100 - 26%
TOTAL EXPENDITURES $ 1,133,074 $ 867,400 $ 867,400 $ 993,900 $ 959,000 $ - 11%
REVENUES
GENERAL FUND $ 687,479 $ 721,700 $ 721,700 $ 809,800 $ 774,900 $ -
GOV. CAPITAL PROJECT FUND 445,594 145,700 145,700 184,100 184,100 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 5.0
BUDGETED PART-TIME POSITIONS 3.0 5.0 5.0 5.0 5.0
254
Page 260
FY 2018 ANNUAL OPERATING BUDGET— DOVER, DELAWARE
Human Resources
Fiscal Year 2018 Organizational Chart
CITY
MANAGER
HUMAN RESOURCES DIRECTOR
1
HUMAN RESOURCES COORDINATOR ADMINISTRATIVE ASSISTANT
1 1
255
Page 261
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
HUMAN RESOURCES
110-3100-518
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 190,880 $ 187,100 $ 194,300 $ 187,100 $ 187,100 $ - 0%
10-12 OVERTIME 159 - - - - - 0%
10-14 FICA TAXES 13,923 14,300 14,800 14,300 14,300 - 0%
10-15 HEALTH INSURANCE 33,650 39,600 39,600 47,400 47,400 - 20%
10-16 L I D INSURANCE 1,229 1,300 1,300 1,300 1,300 - 0%
10-17 WORKERS COMPENSATION 619 600 600 600 600 - 0%
10-18 EDUCATIONAL ASSISTANCE 2,414 - 1,200 - - - 0%
10-19 PENSION 59,911 84,100 84,100 86,400 86,400 - 3%
10-20 OPEB 21,977 18,100 18,100 25,600 25,600 - 41%
PERSONNEL COSTS 324,762 345,100 354,000 362,700 362,700 - 5%
20-21 FURNITURE/FIXTURES - - 1,000 1,000 - - 100%
20-22 OFFICE SUPPLIES 716 800 800 800 800 - 0%
20-23 PRINTING AND DUPLICATING 3,198 3,000 3,000 3,000 3,000 - 0%
20-26 PROGRAM EXPENSES/SUPPLIES 298 400 400 400 400 - 0%
20-28 MEDICAL SUP & PHYSICALS 14,318 14,000 14,000 16,000 14,000 - 0%
20-31 BOOKS 571 500 500 - - - -100%
20-32 SECURITY/SAFETY MATERIALS 248 300 300 300 300 - 0%
20-37 COMPUTER SOFTWARE - 400 400 - - - -100%
20-38 COMPUTER HARDWARE 2,715 - - 2,800 1,500 - 0%
20-48 PERSONNEL RELATED SUP 9,558 10,000 10,000 12,000 9,000 - -10%
MATERIALS & SUPPLIES 31,621 29,400 30,400 36,300 29,000 - -1%
30-21 TELEPHONE/FAX 457 500 500 500 500 - 0%
30-25 ADVERTISEMENT 2,640 5,600 5,600 76,000 20,000 - 257%
30-27 SUBSCRIPTIONS AND DUES 719 900 900 800 600 - -33%
30-28 TRAINING/CONF/FOOD/TRAVEL 2,959 2,500 2,500 4,500 2,500 - 0%
30-29 CONSULTING FEES - - - 15,000 7,500 - 0%
30-31 CONTRACTUAL SERVICES - 1,000 1,000 1,000 1,000 - 0%
30-39 IN-HOUSE TRAINING 680 1,500 1,500 700 500 - -67%
30-41 UNEMPLOYMENT COMP EXPENSE 2,975 6,000 6,000 4,000 6,000 - 0%
ADMINISTRATIVE EXPENDITURES 10,429 18,000 18,000 102,500 38,600 - 114%
OPERATING EXPENDITURES 366,812 392,500 402,400 501,500 430,300 - 10%
TOTAL EXPENDITURES $ 366,812 $ 392,500 $ 402,400 $ 501,500 $ 430,300 $ - 10%
REVENUES
GENERAL FUND $ 366,812 $ 392,500 $ 402,400 $ 501,500 $ 430,300 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 3.0 3.0 3.0 3.0 3.0
256
Page 262
FY 2018 Annual Operating Budget—Dover, Delaware
Information Technology
Fiscal Year 2018 Organization Chart
City Manager
Assistant City Manager
Information Technology
Information Technology Director
1
AS400 System Administrator
1 (Vacant)
LAN Analyst
2 (1 Vacant)
Senior Programmer Analyst
1
Administrative Assistant
1
257
Page 263
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
INFORMATION TECHNOLOGY
110-2200-516
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 210,688 $ 250,200 $ 253,600 $ 250,200 $ 247,300 $ - -1%
10-13 TEMPORARY - 13,800 13,800 13,800 - - -100%
10-14 FICA TAXES 15,765 20,200 20,500 20,200 18,900 - -6%
10-15 HEALTH INSURANCE 19,641 33,500 33,500 34,300 35,000 - 4%
10-16 L I D INSURANCE 1,026 1,300 1,300 1,300 1,300 - 0%
10-17 WORKERS COMPENSATION 683 900 900 900 800 - -11%
10-18 EDUCATIONAL ASSISTANCE 5,259 - - - - - 0%
10-19 PENSION 68,018 97,200 97,200 99,700 99,500 - 2%
10-20 OPEB 23,735 24,300 24,300 34,300 33,900 - 40%
PERSONNEL COSTS 344,815 441,400 445,100 454,700 436,700 - -1%
20-22 OFFICE SUPPLIES 517 1,100 1,100 1,000 600 - -45%
20-34 DATA PROCESSING SUPPLIES 597 1,000 1,000 900 600 - -40%
20-37 COMPUTER SOFTWARE 80,826 83,000 85,000 86,000 86,000 - 4%
20-38 COMPUTER HARDWARE 5,936 13,600 13,600 9,600 7,600 - -44%
MATERIALS & SUPPLIES 87,875 98,700 100,700 97,500 94,800 - -4%
30-21 TELEPHONE/FAX 1,899 2,300 2,300 2,500 2,000 - -13%
30-27 SUBSCRIPTIONS AND DUES 195 200 200 700 700 - 250%
30-28 TRAINING/CONF/FOOD/TRAVEL 1,342 1,500 1,500 1,500 1,500 - 0%
30-31 CONTRACTUAL SERVICES 34,099 34,800 34,800 31,100 101,100 - 191%
30-39 IN-HOUSE TRAINING 6,200 6,400 6,400 6,400 6,400 - 0%
30-61 OFF EPUIP/REPAIRS & MAINT 126,732 130,900 128,900 133,400 130,900 - 0%
30-62 GASOLINE 68 100 100 100 100 - 0%
ADMINISTRATIVE EXPENDITURES 170,535 176,200 174,200 175,700 242,700 - 38%
OPERATING EXPENSES 603,226 716,300 720,000 727,900 774,200 - 8%
40-28 COMPUTER HARDWARE/CAPITAL - - - 50,600 36,600 - 0%
CAPITAL OUTLAY - - - 50,600 36,600 - 0%
TOTAL EXPENDITURES $ 603,226 $ 716,300 $ 720,000 $ 778,500 $ 810,800 $ - 13%
REVENUES
GENERAL FUND $ 603,226 $ 716,300 $ 720,000 $ 727,900 $ 774,200 $ -
GOV. CAPITAL PROJECT FUND - - - 50,600 36,600 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 4.0 4.0 4.0 4.0 4.0
BUDGETED PART-TIME POSITIONS 1.0 1.0 1.0 1.0 -
258
Page 264
FY 2018 Annual Operating Budget—Dover, Delaware
Parks & Recreation
Fiscal Year 2018 Organization Chart
Parks & Recreation
Planning & Community Development Director
1 (Consultant)
Administrative Assistant
1
Recreation Specialist
1
Playground Leader I
T/P 20
Playground Leader II
T/P 2
Sports Coordinator
1
Recreation Center Coordinator
1
Office Assistant
1
Building Supervisor
2 P/P (1 Vacant)
Service Center Clerk
2 P/P
259
Page 265
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
RECREATION
110-1500-525
2017-2018
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 % Subs Abuse
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE BUDGET
10-11 SALARIES $ 234,936 $ 234,400 $ 240,300 $ 235,600 $ 235,600 $ - 1% $ -
10-12 OVERTIME 1,710 1,600 1,600 1,600 1,600 - 0% -
10-13 TEMPORARY HELP 81,555 122,100 122,100 122,800 122,800 - 1% 62,700
10-14 FICA TAXES 23,561 27,400 27,900 27,500 27,500 - 0% 4,800
10-15 HEALTH INSURANCE 47,867 51,400 51,400 51,400 51,400 - 0% -
10-16 L I D INSURANCE 1,479 1,200 1,200 1,200 1,200 - 0% -
10-17 WORKERS COMPENSATION 1,027 1,100 1,100 1,200 1,200 - 9% 200
10-19 PENSION 29,554 37,600 37,600 39,100 39,100 - 4% -
10-20 OPEB 27,061 22,700 22,700 32,300 32,300 - 42% -
PERSONNEL COSTS 448,749 499,500 505,900 512,700 512,700 - 3% 67,700
20-22 OFFICE SUPPLIES 1,998 2,000 2,000 2,000 2,000 - 0% -
20-23 PRINTING AND DUPLICATING 3,798 3,000 3,000 3,000 2,500 - -17% -
20-26 PROGRAM EXPENSES/SUPPLIES 61,724 43,000 43,000 43,000 43,000 - 0% 35,000
20-32 SECURITY/SAFETY MATERIALS - 500 500 500 500 - 0% -
20-37 COMPUTER SOFTWARE 2,700 2,700 2,700 3,200 2,900 - 7% -
20-38 COMPUTER HARDWARE 3,461 - - 1,500 1,500 - 0% -
20-46 CITY BLDG MAINT SUPPLIES 4,142 5,000 5,000 5,000 4,500 - -10% -
20-58 WATER/SEWER 776 800 800 800 800 - 0% -
MATERIALS & SUPPLIES 78,600 57,000 57,000 59,000 57,700 - 1% 35,000
30-21 TELEPHONE/FAX 2,264 2,100 2,100 2,300 2,300 - 10% -
30-23 ELECTRICITY 55,538 62,000 62,000 62,000 57,000 - -8% -
30-24 HEATING OIL/GAS 3,433 6,000 6,000 6,000 6,000 - 0% -
30-27 SUBSCRIPTIONS AND DUES 2,368 2,100 2,100 2,100 2,100 - 0% -
30-28 TRAINING/CONF/FOOD/TRAVEL 195 500 500 1,700 1,200 - 140% -
30-31 CONTRACTUAL SERVICES 121,182 119,500 119,500 126,300 122,000 - 2% -
30-61 OFF EQUIP/REPAIRS & MAINT 161 1,000 1,000 1,000 1,000 - 0% -
30-62 GASOLINE 971 1,200 1,200 900 900 - -25% -
ADMINISTRATIVE EXPENDITURES 186,113 194,400 194,400 202,300 192,500 - -1% -
OPERATING EXPENDITURES 713,462 750,900 757,300 774,000 762,900 - 2% 102,700
40-25 OTHER EQUIP - PURCHASE 7,850 - - - - - 0% -
40-31 CONSTRUCTION - PURCHASE 62,664 165,000 - 241,000 271,000 - 64% -
CAPITAL OUTLAY 70,514 165,000 - 241,000 271,000 - 64% -
TOTAL EXPENDITURES $ 783,976 $ 915,900 $ 757,300 $ 1,015,000 $ 1,033,900 $ - 13% $ 102,700
REVENUES
GENERAL FUND $ 713,462 $ 750,900 $ 757,300 $ 774,000 $ 762,900 $ - $ -
GOV. CAPITAL PROJECT FUND 70,514 165,000 - 241,000 271,000 - -
GRANT FUNDS - - - - - - 102,700
PERSONNEL
BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 5.0 -
PP/TEMP 14.0 14.0 14.0 14.0 14.0 10.0
260
Page 266
FY 2018 Annual Operating Budget—Dover, Delaware
Dover Public Library
Fiscal Year 2018 Organization Chart
Assistant City Manager
Library Administrative Asst BTOP/Inspiration Space
Library Director Coordinator
1 1 1
Assistant Library Director
1
Adult Services Technical Services
Librarian II Head of Technical Svcs Lib I
1 1
Library Assistant
Librarian I 1
2 PT
Library Assistant Circulation Services
1
Library Clerk II
Library Assistant 1
1 P/P
Library Clerk I
1
Youth Services
Library Clerk I
Librarian II (6) P/P
1
Library Pages
Librarian I 4 P/P
1
Librarian I
1 P/P Dover Police Cadets
3 PT
Library Assistant
1
Passport Clerk
2 PT Pilot Program
Library Assistant
2 P/P
Library Assistant
1
261
Page 267
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
LIBRARY
110-1500-523
2017-2018
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 % GRANTS
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE BUDGET
10-11 SALARIES $ 562,167 $ 616,300 $ 633,700 $ 615,800 $ 614,400 $ - 0% $ -
10-12 OVERTIME 2,892 3,700 3,700 3,700 3,700 - 0% -
10-13 TEMPORARY HELP 224,690 271,200 271,200 305,000 305,000 - 12% -
10-14 FICA TAXES 57,156 68,100 70,000 70,700 70,500 - 4% -
10-15 HEALTH INSURANCE 156,510 182,700 182,700 167,800 167,800 - -8% -
10-16 L I D INSURANCE 3,028 2,500 2,500 2,600 2,600 - 4% -
10-17 WORKERS COMPENSATION 6,604 9,200 9,600 10,400 10,400 - 13% -
10-19 PENSION 109,604 155,500 155,500 160,300 160,200 - 3% -
10-20 OPEB 65,390 59,800 59,800 84,400 84,200 - 41% -
PERSONNEL COSTS 1,188,041 1,369,000 1,388,700 1,420,700 1,418,800 - 4% -
20-21 FURNITURE/FIXTURES - - 9,000 - - - 0% 1,500
20-22 OFFICE SUPPLIES 1,500 1,500 2,500 1,500 1,500 - 0% 30,000
20-26 PROGRAM EXPENSES/SUPPLIES 600 - - - 8,500 - 0% 23,500
20-31 BOOKS 53,999 35,200 35,200 54,000 54,000 - 53% 126,400
20-32 SECURITY/SAFETY MATERIALS 2,589 3,300 3,300 1,000 1,000 - -70% -
20-37 COMPUTER SOFTWARE 499 500 500 500 400 - -20% 2,100
20-38 COMPUTER HARDWARE 1,100 1,000 1,000 1,200 1,100 - 10% 1,000
20-46 CITY BLDG MAINT SUPPLIES 10,571 15,000 15,000 15,000 15,000 - 0% -
20-47 AUDIO VISUAL SUPPLIES - - - - - - 0% 74,700
20-58 WATER/SEWER 2,274 2,400 2,400 2,400 2,300 - -4% -
MATERIALS & SUPPLIES 73,133 58,900 68,900 75,600 83,800 - 42% 272,200
30-21 TELEPHONE/FAX 4,106 4,000 4,000 4,000 4,000 - 0% -
30-22 POSTAGE - - - - - - 0% 100
30-23 ELECTRICITY 93,077 93,000 93,000 93,000 89,000 - -4% -
30-24 HEATING OIL/GAS 6,998 6,000 6,000 6,000 7,000 - 17% -
30-27 SUBSCRIPTIONS AND DUES 11,000 11,000 11,000 11,000 11,000 - 0% -
30-28 TRAINING/CONF/FOOD/TRAVEL 500 - - - - - 0% 2,500
30-31 CONTRACTUAL SERVICES 49,986 89,300 89,300 90,800 89,300 - 0% -
30-61 OFF EQUIP/REPAIRS & MAINT 3,800 3,800 3,800 18,800 6,800 - 79% 4,900
30-69 OFFICE EQUIPMENT/LEASE - - 2,000 - - - 0% 2,000
ADMINISTRATIVE EXPENDITURES 169,467 207,100 209,100 223,600 207,100 - 0% 9,500
OPERATING EXPENDITURES 1,430,640 1,635,000 1,666,700 1,719,900 1,709,700 - 5% 281,700
40-31 CONSTRUCTION - PURCHASE - - 15,000 - - - 0% -
CAPITAL OUTLAY - - 15,000 - - - 0% -
20-26 FEDERAL PROG EXP/SUPPLIES - - - - - - 0% 2,500
TOTAL EXPENDITURES $ 1,430,640 $ 1,635,000 $ 1,681,700 $ 1,719,900 $ 1,709,700 $ - 5% $ 284,200
REVENUES
GENERAL FUND $ 1,430,640 $ 1,635,000 $ 1,666,700 $ 1,719,900 $ 1,709,700 $ - $ -
GOV. CAPITAL PROJECT FUND - - 15,000 - - - -
GRANT FUNDS - - - - - - 284,200
PERSONNEL
BUDGETED FULL-TIME POSITIONS 13.0 13.0 13.0 13.0 13.0
BUDGETED PART-TIME POSITIONS 19.0 19.0 21.0 21.0 21.0
262
Page 268
FY 2018 ANNUAL OPERATING Budget - DOVER, DELAWARE
DOVER POLICE DEPARTMENT ORGANIZATIONAL CHART
March 2017
MAYOR
City of Dover
CHIEF OF POLICE
1 Sworn (vacant)
Administrative Assistant Chaplain
1 Civilian 3 (Appointed Volunteer Civilians)
SORT Commander Deputy Chief Internal Affairs
(not an additional position) 1 Sworn 1 Sworn
CNT Commander
(not an additional position)
Operations Division Cmdr Administrative Division Cmdr
1 Sworn 1 Sworn
Police Resource Manager
Criminal Investigations Cmdr Patrol Unit Cmdr Special Enforcement 1 Civilian
1 Sworn 1 Sworn Unit Commander
1 Sworn
Central Services Coordinator
1 Civilian
Criminal Investigations “A” Platoon Special Enforcement
Supervisor 11 Sworn Supervisor (1 Sworn)
1 Sworn Building Craftsperson
1 Civilian (vacant)
“B” Platoon
Detectives Section Motorcycle Section
11 Sworn
7 Sworn 4 Sworn Evidence Technician and
Photographer
“C” Platoon 1 Civilian
Crime Scene Investigations Parking Enforcement
13 Sworn
2 Sworn Section
2 Civilians Records Administrator
“D” Platoon 1 Civilian
Sex Offender Section 11 Sworn Animal Control Section
2 Civilians 1 Civilian Records Unit
5 Civilians
Public Affairs
1 Sworn Police Cadets (part-time)
DVOC Supervisor 6 Civilians (5 vacant) Planning and Training
1 Sworn 2 sworn
911 Manager
1 Civilian Community Policing
DVOC Section Section (3 Sworn) Planning and Training
4 Sworn
Firearms Training Unit (1 Sworn)
Communications Section Police Athletic League (PAL)
TAC Section 12 Civilians 1 Sworn Police Academy- 1 Recruit Officer
1 Sworn Field Training- 2 Officers
Full-time on Staff
Juvenile Section and
Gang Intelligence 98 Sworn School Resource Officers Crime Analysis/ Accreditation Section
1 Sworn 31 Civilians 5 Sworn 1 Civilian
130 Employees
2 Civilians
Part-time on Staff
Street Crimes Supervisor Victim Services
1 Sworn 4 Civilians 1 Civilian
Vacancies
Street Crimes Initiative LAN Analyst
6 Sworn 3 Sworn, 1 Fulltime and
1 Full-time Civilian 263 1 Part time Civilian (vacant)
6 Part-time Civilians
Page 269
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
POLICE - CIVILIAN
110-1700-542
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 1,439,499 $ 1,493,700 $ 1,509,000 $ 1,504,300 $ 1,504,300 $ - 1%
10-12 OVERTIME 87,113 70,900 60,400 69,200 69,200 - -2%
10-14 FICA TAXES 109,924 119,600 120,800 120,300 120,300 - 1%
10-15 HEALTH INSURANCE 301,442 325,900 325,900 374,600 374,600 - 15%
10-16 L I D INSURANCE 7,122 7,200 7,200 7,300 7,300 - 1%
10-17 WORKERS COMPENSATION 11,537 7,200 7,300 7,600 7,600 - 6%
10-18 EDUCATIONAL ASSISTANCE 1,839 - 5,000 - - - 0%
10-19 PENSION 337,525 426,800 426,800 465,900 465,900 - 9%
10-20 OPEB 166,415 142,400 142,400 202,500 202,500 - 42%
PERSONNEL COSTS 2,462,415 2,593,700 2,604,800 2,751,700 2,751,700 - 6%
POLICE - LAW ENFORCEMENT
110-1700-543
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES 7,685,685 7,503,800 7,651,000 7,647,900 7,607,900 - 0%
10-12 OVERTIME 426,556 450,600 440,200 460,000 460,000 - 0%
10-14 FICA TAXES 593,904 608,300 619,600 617,000 617,000 - 0%
10-15 HEALTH INSURANCE 1,315,472 1,480,100 1,480,100 1,476,600 1,450,600 - 0%
10-16 L I D INSURANCE 26,762 28,400 28,400 28,400 28,400 - 0%
10-17 WORKERS COMPENSATION 401,507 473,000 481,800 497,800 497,800 - 0%
10-18 EDUCATIONAL ASSISTANCE 11,055 - 5,600 - - - 0%
10-19 PENSION 987,066 1,004,100 1,004,100 844,900 819,900 - 0%
10-20 OPEB 822,987 704,600 704,600 1,013,600 1,013,600 - 0%
PERSONNEL COSTS 12,270,993 12,252,900 12,415,400 12,586,200 12,495,200 - 2%
POLICE - EXTRA DUTY
110-1700-544
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES 609,839 689,800 710,700 492,100 492,000 - -29%
10-14 FICA TAXES 47,521 52,800 52,800 37,600 37,600 - -29%
10-17 WORKERS COMPENSATION 26,500 41,000 41,000 30,400 30,400 - -26%
PERSONNEL COSTS 683,859 783,600 804,500 560,100 560,000 - -29%
TOTAL PERSONNEL COSTS $ 15,417,267 $ 15,630,200 $ 15,824,700 $ 15,898,000 $ 15,806,900 $ - 1%
POLICE - CADET PROGRAM IN POLICE GRANT FUND
710-1700-545
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-13 TEMPORARY HELP 67,850 71,400 71,400 71,400 11,900 - -83%
10-14 FICA TAXES 5,191 5,500 5,500 5,500 900 - -84%
10-17 WORKERS COMPENSATION 3,383 4,200 4,200 4,400 700 - -83%
PERSONNEL COSTS 76,423 81,100 81,100 81,300 13,500 - -83%
PERSONNEL
BUDGETED FULL-TIME POSITIONS 134.0 134.0 134.0 134.0 134.0
BUDGETED PART-TIME POSITIONS - GRANT 6.0
FUNDED 6.0 6.0 6.0 1.0
264
Page 270
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
POLICE - ADMINISTRATION
110-1700-541
2017-2018
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 % GRANTS
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE BUDGET
20-14 CI PETTY CASH DISBURSEMTS $ 41,367 $ 8,000 $ 8,000 $ 1,000 $ 1,000 $ - -88% $ -
20-21 FURNITURE/FIXTURES - - - 4,000 4,000 - 0% -
20-22 OFFICE SUPPLIES 6,083 7,000 7,000 7,000 7,000 - 0% -
20-23 PRINTING AND DUPLICATING 19,135 14,000 14,000 17,000 17,000 - 21% -
20-24 PHOTOGRAPHIC 1,371 1,500 1,000 3,500 1,500 - 0% -
20-25 CUSTODIAL 4,247 4,500 5,600 8,000 7,000 - 56% -
20-26 PROGRAM EXPENSES/SUPPLIES 89,981 67,000 67,000 79,500 67,000 - 0% 312,000
20-28 MEDICAL SUP & PHYSICALS 35,540 32,000 32,000 32,000 30,000 - -6% -
20-29 UNIFORMS/UNIFORM ALLOW 107,117 82,000 82,000 89,100 82,000 - 0% -
20-31 BOOKS - 3,000 2,700 500 - - -100% -
20-32 SECURITY/SAFETY MATERIALS 1,105 1,500 1,500 1,500 1,200 - -20% -
20-36 ANIMAL CARE EXPENSES 13,216 17,000 17,000 17,000 3,000 - -82% -
20-37 COMPUTER SOFTWARE 11,231 16,700 16,700 15,200 13,500 - -19% -
20-38 COMPUTER HARDWARE 96,834 82,300 82,300 65,500 62,500 - -24% -
20-46 CITY BLDG MAINT SUPPLIES 52,277 31,400 36,400 41,500 41,500 - 32% -
20-58 WATER/SEWER 2,125 2,700 2,700 2,700 2,300 - -15% -
MATERIALS & SUPPLIES 481,630 370,600 375,900 385,000 340,500 - -8% 312,000
30-21 TELEPHONE/FAX 50,387 52,900 52,900 54,600 52,900 - 0% 20,000
30-22 POSTAGE 80 100 100 1,100 - - -100% -
30-23 ELECTRICITY 82,598 85,000 85,000 85,000 79,000 - -7% -
30-24 HEATING OIL/GAS 6,985 12,800 10,800 12,800 10,800 - -16% -
30-25 ADVERTISEMENT 480 1,000 700 1,000 1,000 - 0% -
30-26 INSURANCE 41,888 30,000 30,000 30,000 30,000 - 0% -
30-27 SUBSCRIPTIONS AND DUES 6,727 5,000 5,000 5,300 5,300 - 6% -
30-28 TRAINING/CONF/FOOD/TRAVEL 49,769 71,000 71,000 92,000 50,000 - -30% 15,000
30-29 CONSULTING FEES/AUDIT FEES 11,716 10,400 10,400 10,400 10,400 - 0% 1,000
30-31 CONTRACTUAL SERVICES 85,112 192,600 192,600 172,400 172,400 - -10% -
30-61 OFF EPUIP/REPAIRS & MAINT 33,512 38,200 38,200 56,200 50,400 - 32% -
30-62 GASOLINE 126,792 135,000 132,000 135,000 117,700 - -13% -
30-63 AUTO REPAIRS/MAINTENANCE 211,487 217,400 217,400 261,500 217,600 - 0% -
30-67 RADIO REPAIRS/MAINTENANCE 20,561 22,500 22,500 25,500 22,500 - 0% -
30-68 RADIO EPUIPMENT/LEASE 8,528 500 500 11,300 8,500 - 1600% -
ADMINISTRATIVE EXPENDITURES 736,622 874,400 869,100 954,100 828,500 - -5% 36,000
OPERATING EXPENDITURES 16,635,520 16,875,200 17,069,700 17,237,100 16,975,900 - 1% 348,000
40-21 OFFICE EPUIPMENT PURCHASE - - - 10,000 - - 0% -
40-22 AUTOMOBILES - PURCHASE 248,601 287,300 287,300 392,400 275,800 - -4% -
40-25 OTHER EPUIP - PURCHASE - 12,500 - 66,000 - - -100% -
40-31 CONSTRUCTION - PURCHASE 19,900 - 12,500 1,750,000 104,100 - 0% -
50-01 TRANSFER TO GENERAL FUND - - - - 0% 60,000
CAPITAL OUTLAY 268,501 299,800 299,800 2,218,400 379,900 - 27% 60,000
TOTAL EXPENDITURES $ 16,904,021 $ 17,175,000 $ 17,369,500 $ 19,455,500 $ 17,355,800 $ - 1% $ 408,000
REVENUES
GENERAL FUND $16,635,520 $16,875,200 $ 17,069,700 $ 17,237,100 $ 16,975,900 $ -
GOV. CAPITAL PROJECT FUND 268,501 299,800 299,800 2,218,400 379,900 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 134.0 134.0 134.0 134.0 134.0 -
BUDGETED PART-TIME POSITIONS - GRANT 6.0
FUNDED 6.0 6.0 6.0 1.0 6.0
265
Page 271
FY 2018 ANNUAL OPERATING BUDGET— DOVER, DELAWARE
Fiscal Year 2018 Organization Chart
CITY
COUNCIL
TAX
ASSESSOR
City Assessor*
1
Administrative Assistant
1
Residential Assessment Tech.
1
* Appointed by Council
266
Page 272
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
TAX ASSESSOR
110-1300-513
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 131,468 $ 132,200 $ 135,400 $ 130,500 $ 130,500 $ - -1%
10-14 FICA TAXES 9,340 10,100 10,300 10,000 10,000 - -1%
10-15 HEALTH INSURANCE 31,736 34,100 34,100 21,300 21,300 - -38%
10-16 L I D INSURANCE 804 800 800 800 800 - 0%
10-17 WORKERS COMPENSATION 574 700 700 700 700 - 0%
10-18 EDUCATIONAL ASSISTANCE 3,231 - - - - - 0%
10-19 PENSION 20,541 27,200 27,200 27,800 27,800 - 2%
10-20 OPEB 15,336 12,800 12,800 17,900 17,900 - 40%
PERSONNEL COSTS 213,029 217,900 221,300 209,000 209,000 - -4%
20-22 OFFICE SUPPLIES 2,678 2,300 2,600 2,300 2,300 - 0%
20-23 PRINTING AND DUPLICATING 81 200 200 200 200 - 0%
20-37 COMPUTER SOFTWARE 50 - - 100 - - 0%
20-38 COMPUTER HARDWARE - - 900 900 - 0%
MATERIALS & SUPPLIES 2,808 2,500 2,800 3,500 3,400 - 36%
30-21 TELEPHONE/FAX 1,147 1,300 1,300 1,300 1,300 - 0%
30-25 ADVERTISEMENT 763 1,000 1,000 1,000 1,000 - 0%
30-27 SUBSCRIPTIONS AND DUES 1,097 800 800 900 900 - 13%
30-28 TRAINING/CONF/FOOD/TRAVEL 4,780 7,500 7,500 7,500 7,500 - 0%
30-31 CONTRACTUAL SERVICES 13,265 12,400 12,200 13,100 13,100 - 6%
30-62 GASOLINE 476 600 500 1,000 600 - 0%
ADMINISTRATIVE EXPENDITURES 21,527 23,600 23,300 24,800 24,400 - 3%
OPERATING EXPENDITURES 237,364 244,000 247,400 237,300 236,800 - -3%
40-22 AUTOMOBILE/PURCHASE - - - 18,200 - - 0%
CAPITAL OUTLAY - - - 18,200 - - 0%
TOTAL EXPENDITURES $ 237,364 $ 244,000 $ 247,400 $ 255,500 $ 236,800 $ - -3%
REVENUES
GENERAL FUND $ 237,364 $ 244,000 $ 247,400 $ 237,300 $ 236,800 $ -
GOV. CAPITAL PROJECT FUND - - - 18,200 - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 3.0 3.0 3.0 3.0 3.0
267
Page 273
FY 2018 Annual Operating Budget—Dover, Delaware
Planning & Inspections
Fiscal Year 2018 Organization Chart
City Council
Planning & Inspections
Director of Planning & Community
Development Director
1 (Consultant)
Planning Life Safety Code Enforcement Inspections & Permitting
Secretary II Fire Marshal Inspector III Chief Building Inspector
1 1 1 1
Principal Planner Deputy Fire Marshal/ Inspector II Inspector II
1 Inspector II 1 2
1
Planner I Deputy Fire Marshal/ Inspector I Inspections/Licensing
2 (1 Vacantt) Inspector I 3
1
Licensing & Permitting
Planner I/Community Dev. Supervisor
1 1
Office Assistant II
2
268
Page 274
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PLANNING
110-1600-533
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 362,343 $ 380,300 $ 385,900 $ 380,700 $ 380,700 $ - 0%
10-12 OVERTIME 856 1,000 1,000 1,000 1,000 - 0%
10-13 TEMPORARY HELP 13,765 15,000 15,000 15,000 15,000 - 0%
10-14 FICA TAXES 27,600 30,300 30,700 30,300 30,300 - 0%
10-15 HEALTH INSURANCE 52,386 60,200 60,200 64,100 64,100 - 6%
10-16 L I D INSURANCE 1,903 2,200 2,200 2,200 2,200 - 0%
10-17 WORKERS COMPENSATION 2,057 1,200 1,200 1,300 1,300 - 8%
10-19 PENSION 20,632 22,000 22,000 21,500 21,500 - -2%
10-20 OPEB 41,745 36,900 36,900 52,200 52,200 - 41%
10-21 COSTS ALLOCATED TO CDBG (39,938) (36,000) (36,000) (36,000) (36,000) - 0%
PERSONNEL COSTS 483,348 513,100 519,100 532,300 532,300 - 4%
20-22 OFFICE SUPPLIES 4,662 4,000 4,000 4,500 4,000 - 0%
20-23 PRINTING AND DUPLICATING 8,128 6,000 6,000 6,000 6,000 - 0%
20-31 BOOKS 737 700 700 900 700 - 0%
20-37 COMPUTER SOFTWARE 1,480 - - 200 - - 0%
20-38 COMPUTER HARDWARE - 2,600 2,600 3,000 1,600 - -38%
MATERIALS & SUPPLIES 15,007 13,300 13,300 14,600 12,300 - -8%
30-21 TELEPHONE/FAX 1,455 1,300 1,300 2,100 1,700 - 31%
30-25 ADVERTISEMENT 2,063 2,000 2,000 2,000 2,000 - 0%
30-27 SUBSCRIPTIONS AND DUES 4,030 2,900 2,900 1,900 1,900 - -34%
30-28 TRAINING/CONF/FOOD/TRAVEL 4,254 4,200 4,200 3,800 1,300 - -69%
30-31 CONTRACTUAL SERVICES 6,147 10,000 10,000 10,000 10,000 - 0%
ADMINISTRATIVE EXPENDITURES 17,949 20,400 20,400 19,800 16,900 - -17%
OPERATING EXPENDITURES 516,303 546,800 552,800 566,700 561,500 - 3%
40-23 TRUCKS-PURCHASE - - - 16,000 - - 0%
CAPITAL OUTLAY - - - 16,000 - - 0%
TOTAL EXPENDITURES $ 516,303 $ 546,800 $ 552,800 $ 582,700 $ 561,500 $ - 3%
REVENUES
GENERAL FUND $ 476,366 $ 510,800 $ 516,800 $ 530,700 $ 525,500 $ -
CDBG GRANT 39,938 36,000 36,000 36,000 36,000 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 6.0 6.0
PP/TEMP/COMMITTEES 14.0 14.0 14.0 14.0 14.0
269
Page 275
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
LIFE SAFETY
110-1600-531
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 144,478 $ 158,800 $ 160,000 $ 148,600 $ 148,600 $ - -6%
10-12 OVERTIME 8,308 8,000 8,000 8,000 8,000 - 0%
10-14 FICA TAXES 11,274 12,800 12,900 12,000 12,000 - -6%
10-15 HEALTH INSURANCE 22,610 25,700 25,700 31,700 31,700 - 23%
10-16 L I D INSURANCE 766 800 800 1,000 1,000 - 25%
10-17 WORKERS COMPENSATION 734 1,000 1,000 1,100 1,100 - 10%
10-19 PENSION 8,779 9,900 9,900 11,400 11,400 - 15%
10-20 OPEB 15,465 14,600 14,600 19,000 19,000 - 30%
PERSONNEL COSTS 212,415 231,600 232,900 232,800 232,800 - 1%
20-26 PROGRAM EXPENSES/SUPPLIES 1,425 - - 1,500 1,500 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 92 300 300 300 300 - 0%
20-31 BOOKS - - - - 600 - 0%
20-32 SECURITY/SAFETY MATERIALS 36 - - 9,000 7,900 - 0%
20-37 COMPUTER SOFTWARE 770 - - - - - 0%
20-38 COMPUTER HARDWARE 2,489 - - - - - 0%
MATERIALS & SUPPLIES 4,811 300 300 10,800 10,300 - 3333%
30-21 TELEPHONE/FAX 1,895 1,900 1,900 1,900 2,100 - 11%
30-27 SUBSCRIPTIONS AND DUES 1,421 1,300 1,300 3,700 1,900 - 46%
30-28 TRAINING/CONF/FOOD/TRAVEL 3,718 1,500 1,500 3,000 2,200 - 47%
30-31 CONTRACTUAL SERVICES 263,791 245,000 245,000 245,000 245,000 - 0%
30-62 GASOLINE 2,745 3,000 3,000 3,000 3,000 - 0%
30-63 AUTO REPAIRS/MAINTENANCE - 1,700 - - - 0%
30-67 RADIO REPAIRS/MAINTENANCE 606 600 600 600 600 - 0%
ADMINISTRATIVE EXPENDITURES 274,176 253,300 255,000 257,200 254,800 - 1%
OPERATING EXPENDITURES 491,402 485,200 488,200 500,800 497,900 - 3%
40-22 AUTOMOBILE/PURCHASE 56,411 29,500 29,500 - - - -100%
CAPITAL OUTLAY 56,411 29,500 29,500 - - - -100%
TOTAL EXPENDITURES $ 547,813 $ 514,700 $ 517,700 $ 500,800 $ 497,900 $ - -3%
REVENUES
GENERAL FUND $ 491,402 $ 485,200 $ 488,200 $ 500,800 $ 497,900 $ -
GOV. CAPITAL PROJECT FUND 56,411 29,500 29,500 - - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 3.0 3.0 3.0 3.0 3.0
270
Page 276
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CODE ENFORCEMENT
110-1600-532
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 211,054 $ 222,700 $ 223,800 $ 229,100 $ 229,100 $ - 3%
10-12 OVERTIME 2,063 2,500 2,500 2,500 2,500 - 0%
10-13 TEMPORARY HELP 6,685 - - - - - 0%
10-14 FICA TAXES 16,012 17,200 17,300 17,700 17,700 - 3%
10-15 HEALTH INSURANCE 51,446 55,700 55,700 59,600 59,600 - 7%
10-16 L I D INSURANCE 1,160 1,200 1,200 1,300 1,300 - 8%
10-17 WORKERS COMPENSATION 1,038 1,300 1,300 1,600 1,600 - 23%
10-18 EDUCATIONAL ASSISTANCE 5,472 - 4,500 - - - 0%
10-19 PENSION 56,972 74,100 74,100 77,200 77,200 - 4%
10-20 OPEB 24,272 21,600 21,600 31,300 31,300 - 45%
PERSONNEL COSTS 376,176 396,300 402,000 420,300 420,300 - 6%
20-26 PROGRAM EXPENSES/SUPPLIES 13,345 18,000 16,300 18,000 18,000 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 272 300 300 300 300 - 0%
20-32 SECURITY/SAFETY MATERIALS 29 - - 2,300 2,300 - 0%
20-38 COMPUTER HARDWARE - - - 500 - - 0%
MATERIALS & SUPPLIES 13,645 18,300 16,600 21,100 20,600 - 13%
30-21 TELEPHONE/FAX 1,807 700 700 2,200 2,100 - 200%
30-27 SUBSCRIPTIONS AND DUES 15 200 200 200 200 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 785 1,000 1,000 1,000 1,000 - 0%
30-31 CONTRACTUAL SERVICES 1,541 1,600 1,600 1,600 1,000 - -38%
30-62 GASOLINE 2,128 3,000 3,000 2,500 2,500 - -17%
ADMINISTRATIVE EXPENDITURES 6,276 6,500 6,500 7,500 6,800 - 5%
OPERATING EXPENDITURES 396,097 421,100 425,100 448,900 447,700 - 6%
40-22 AUTOMOBILES- PURCHASE - - - 23,800 - - 0%
CAPITAL OUTLAY - - - 23,800 - - 0%
TOTAL EXPENDITURES $ 396,097 $ 421,100 $ 425,100 $ 472,700 $ 447,700 $ - 6%
REVENUES
GENERAL FUND $ 396,097 $ 421,100 $ 425,100 $ 448,900 $ 447,700 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 5.0
271
Page 277
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
INSPECTIONS
110-1600-534
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 266,005 $ 277,500 $ 280,400 $ 282,600 $ 282,600 $ - 2%
10-12 OVERTIME 3,722 2,000 2,000 2,000 2,000 - 0%
10-14 FICA TAXES 19,578 21,400 21,600 21,800 21,800 - 2%
10-15 HEALTH INSURANCE 59,655 69,900 69,900 71,000 71,000 - 2%
10-16 L I D INSURANCE 1,238 1,200 1,200 1,400 1,400 - 17%
10-17 WORKERS COMPENSATION 1,155 1,400 1,400 1,600 1,600 - 14%
10-19 PENSION 72,615 103,300 103,300 107,600 107,600 - 4%
10-20 OPEB 30,760 26,900 26,900 38,700 38,700 - 44%
PERSONNEL COSTS 454,728 503,600 506,700 526,700 526,700 - 5%
20-26 PROGRAM EXPENSES/SUPPLIES 10 - - - - - 0%
20-29 UNIFORMS/UNIFORM ALLOW 224 200 200 200 200 - 0%
20-31 BOOKS 338 2,000 2,000 2,600 1,100 - -45%
20-38 COMPUTER HARDWARE 3,487 - - 900 900 - 0%
MATERIALS & SUPPLIES 4,059 2,200 2,200 3,700 2,200 - 0%
30-21 TELEPHONE/FAX 2,899 3,000 3,000 2,700 3,000 - 0%
30-27 SUBSCRIPTIONS AND DUES 575 600 600 600 600 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 1,034 1,000 1,000 1,000 1,000 - 0%
30-31 CONTRACTUAL SERVICES 6,249 6,000 6,000 6,000 6,000 - 0%
30-33 DEMOLITION EXPENSES 250,683 175,000 175,000 475,000 175,000 - 0%
30-61 OFF EPUIP/REPAIRS & MAINT 2,885 3,000 3,000 3,000 2,900 - -3%
30-62 GASOLINE 3,550 3,500 3,500 3,000 3,600 - 3%
ADMINISTRATIVE EXPENDITURES 267,874 192,100 192,100 491,300 192,100 - 0%
OPERATING EXPENSES 726,661 697,900 701,000 1,021,700 721,000 - 3%
40-22 AUTOMOBILES- PURCHASE - - 16,000 - - 0%
CAPITAL OUTLAY - - 16,000 - - 0%
TOTAL EXPENDITURES $ 726,661 $ 697,900 $ 701,000 $ 1,037,700 $ 721,000 $ - 3%
REVENUES
GENERAL FUND $ 726,661 $ 697,900 $ 701,000 $ 1,021,700 $ 721,000 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 6.0 6.0
272
Page 278
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY MANAGER
DEPARTMENT OF PUBLIC WORKS - GENERAL FUND
FISCAL YEAR 2018 ORGANIZATION CHART
PUBLIC WORKS DIRECTOR / CITY ENGINEER
1 (accounted for in Public Works Administration)
FLEET FACILITIES SANITATION STREET & STORMWATER GROUNDS & PARKS PUBLIC WORKS GENERAL FUND
MAINTENANCE MANAGEMENT MAINTENANCE MAINTENANCE ADMINISTRATION ENG. & INSPECTIONS
PUBLIC WORKS OPERATIONS MANAGER WATER / WASTEWATER MANAGER
1 (accounted for in Public Works Administration) 1 (accounted for in Water / Wastewater Eng. & Insp.)
FLEET, FACILITIES & SANITATION FIELD SUPERVISOR II STREETS FIELD SUPER. I GROUNDS FIELD SUPER. II ADMINISTRATIVE ASSIST. CIVIL ENGINEER I
1 (accounted for in Fleet Maintenance) 1 1 2 1
MECHANIC II CRAFTSPERSON II CREW LEADER CREW LEADER CREW LEADER GIS MANAGER ENVIRON. SCIENTIST
2 2 1 1 1 1 1
MECHANIC I CRAFTSPERSON I MOTOR EQUIP. OPER. III LEAD LABORER ARBORIST GIS TECHNICIAN CONSTRUCTION MGR.
3 1 3 1 2 1 1 (in W/WW Eng. & Insp.)
6 ELECTRICIAN II MOTOR EQUIP. OPER. II MOTOR EQUIP. OPER. II GARDENER II 6 PUBLIC WORKS INSPECT.
1 2 2 1 1
CUSTODIAN II MOTOR EQUIP. OPER. I MOTOR EQUIP. OPER. I GARDENER I 3
1 4 2 1
5 10 SIGN / STREET PAINTER LEAD LABORER
1 2
8 LABORER II
1
MOTOR EQUIP. OPER. II
3
SMALL ENGINE MECH. I
1
51
13
273
Page 279
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PUBLIC WORKS - ADMINISTRATION
110-2400-551
2015-2016 2016-2017 2015-2016 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 307,353 $ 371,000 $ 373,100 $ 376,700 $ 374,000 $ - 1%
10-14 FICA TAXES 22,509 28,400 28,600 28,800 28,600 - 1%
10-15 HEALTH INSURANCE 55,635 74,500 74,500 74,500 74,500 - 0%
10-16 L I D INSURANCE 1,701 2,000 2,000 2,100 2,100 - 5%
10-17 WORKERS COMPENSATION 1,137 1,200 1,200 1,200 1,200 - 0%
10-19 PENSION 103,990 148,600 148,600 152,900 151,300 - 2%
10-20 OPEB 35,776 35,900 35,900 51,500 51,200 - 43%
PERSONNEL COSTS 528,100 661,600 663,900 687,700 682,900 - 3%
20-21 FURNITURE/FIXTURES - - - 200 200 - 0%
20-22 OFFICE SUPPLIES 3,526 3,500 3,500 3,500 3,500 - 0%
20-23 PRINTING AND DUPLICATING 3,001 3,000 3,000 3,000 3,000 - 0%
20-37 COMPUTER SOFTWARE 150 400 400 400 - - -100%
20-38 COMPUTER HARDWARE 4,293 - - 4,300 2,700 - 0%
MATERIALS & SUPPLIES 10,970 6,900 6,900 11,400 9,400 - 36%
30-21 TELEPHONE/FAX 2,116 1,900 1,900 2,000 2,000 - 5%
30-27 SUBSCRIPTIONS AND DUES 840 4,400 4,400 4,600 4,600 - 5%
30-28 TRAINING/CONF/FOOD/TRAVEL 4,266 4,000 4,000 3,500 3,500 - -13%
30-31 CONTRACTUAL SERVICES 5,080 - - 7,000 7,000 - 0%
30-62 GASOLINE 778 500 500 1,000 1,000 - 100%
30-67 RADIO REPAIRS/MAINTENANCE 664 700 700 700 700 - 0%
ADMINISTRATIVE EXPENDITURES 13,744 11,500 11,500 18,800 18,800 - 63%
OPERATING EXPENDITURES 552,815 680,000 682,300 717,900 711,100 - 5%
TOTAL EXPENDITURES $ 552,815 $ 680,000 $ 682,300 $ 717,900 $ 711,100 $ - 5%
REVENUES
GENERAL FUND $ 552,815 $ 680,000 $ 682,300 $ 717,900 $ 711,100 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 6.0 6.0
274
Page 280
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PUBLIC WORKS ENGINEERING
110/147-2600-553
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 114,807 $132,800 $ 132,800 $126,400 $152,300 $ - 15%
10-12 OVERTIME - 500 500 500 500 - 0%
10-14 FICA TAXES 8,336 10,200 10,200 9,700 11,700 - 15%
10-15 HEALTH INSURANCE 18,191 38,900 38,900 59,400 59,400 - 53%
10-16 L I D INSURANCE 497 900 900 900 1,200 - 33%
10-17 WORKERS COMPENSATION 1,056 400 400 400 500 - 25%
10-19 PENSION 5,843 7,100 7,100 7,500 9,100 - 28%
10-20 OPEB 13,139 12,800 12,800 17,300 20,800 - 63%
PERSONNEL COSTS 161,870 203,600 203,600 222,100 255,500 - 25%
20-29 UNIFORMS/UNIFORM ALLOW 182 200 200 200 200 - 0%
20-32 SECURITY/SAFETY MATERIALS 168 200 200 200 100 - -50%
20-33 SMALL TOOLS 100 100 100 500 400 - 300%
20-37 COMPUTER SOFTWARE 162 400 400 400 200 - -50%
20-38 COMPUTER HARDWARE 1,209 - - - - - 0%
MATERIALS & SUPPLIES 1,821 900 900 1,300 900 - 0%
30-21 TELEPHONE/FAX 286 500 500 500 300 - -40%
30-28 TRAINING/CONF/FOOD/TRAVEL 888 500 500 1,600 1,600 - 220%
30-31 CONTRACTUAL SERVICES 717 - - 16,800 16,800 - 0%
30-62 GASOLINE 995 1,500 1,500 1,500 1,400 - -7%
ADMINISTRATIVE EXPENDITURES 2,887 2,500 2,500 20,400 20,100 - 704%
OPERATING EXPENDITURES 166,578 207,000 207,000 243,800 276,500 - 34%
TOTAL EXPENDITURES $ 166,578 $ 207,000 $ 207,000 $ 243,800 $ 276,500 $ - 34%
REVENUES
GENERAL FUND $ 166,578 $ 207,000 $ 207,000 $ 243,800 $ 276,500 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 3.0 3.0 3.0 3.0 3.0
275
Page 281
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FACILITIES MANAGEMENT
110-2500-552
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 252,887 $ 235,600 $ 238,600 $ 242,000 $ 242,000 $ - 3%
10-12 OVERTIME 8,673 6,400 6,400 6,400 6,400 - 0%
10-14 FICA TAXES 19,168 18,500 18,700 19,000 19,000 - 3%
10-15 HEALTH INSURANCE 50,833 47,500 47,500 47,500 47,500 - 0%
10-16 L I D INSURANCE 1,195 1,100 1,100 1,100 1,100 - 0%
10-17 WORKERS COMPENSATION 10,610 12,200 12,400 13,700 13,700 - 12%
10-19 PENSION 80,655 115,400 115,400 120,900 120,900 - 5%
10-20 OPEB 28,103 22,800 22,800 33,100 33,100 - 45%
PERSONNEL COSTS 452,124 459,500 462,900 483,700 483,700 - 5%
20-25 CUSTODIAL 8,497 8,500 8,500 10,000 8,500 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 1,102 2,300 2,300 2,300 2,300 - 0%
20-32 SECURITY/SAFETY MATERIALS 189 200 200 200 200 - 0%
20-33 SMALL TOOLS 2,606 1,500 1,500 1,500 1,500 - 0%
20-38 COMPUTER HARDWARE 326 - - - - - 0%
20-46 CITY BLDG MAINT SUPPLIES 5,498 8,000 8,000 8,300 6,300 - -21%
20-58 WATER/SEWER 1,347 1,700 1,700 1,700 1,500 - -12%
20-61 ELEC MATERIALS/SUPPLIES 2,551 2,200 2,200 2,200 2,200 - 0%
MATERIALS & SUPPLIES 22,117 24,400 24,400 26,200 22,500 - -8%
30-21 TELEPHONE/FAX 1,241 1,200 1,200 1,200 1,200 - 0%
30-23 ELECTRICITY 62,242 65,000 65,000 65,000 60,000 - -8%
30-24 HEATING OIL/GAS 5,087 6,400 6,400 6,400 5,200 - -19%
30-27 SUBSCRIPTIONS & DUES 100 100 100 100 100 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 200 100 100 100 100 - 0%
30-31 CONTRACTUAL SERVICES 119,476 47,000 47,000 53,500 53,500 - 14%
30-62 GASOLINE 2,908 3,000 3,000 3,000 3,000 - 0%
30-67 RADIO REPAIRS/MAINTENANCE 332 400 400 400 400 - 0%
ADMINISTRATIVE EXPENDITURES 191,586 123,200 123,200 129,700 123,500 - 0%
OPERATING EXPENDITURES 665,827 607,100 610,500 639,600 629,700 - 4%
40-23 TRUCKS-PURCHASE - 27,700 27,700 25,100 25,100 - -9%
CAPITAL OUTLAY - 27,700 27,700 25,100 25,100 - -9%
TOTAL EXPENDITURES $ 665,827 $ 634,800 $ 638,200 $ 664,700 $ 654,800 $ - 3%
REVENUES
GENERAL FUND $ 665,827 $ 607,100 $ 610,500 $ 639,600 $ 629,700 $ -
GOV. CAPITAL PROJECT FUND - 27,700 27,700 25,100 25,100 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 7.0 5.0 5.0 5.0 5.0
276
Page 282
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FLEET MAINTENANCE
110-2800-572
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 264,173 $ 283,400 $ 284,500 $ 291,300 $ 291,300 $ - 3%
10-12 OVERTIME 6,582 6,700 6,700 6,700 6,700 - 0%
10-14 FICA 19,778 22,200 22,300 22,800 22,800 - 3%
10-15 HEALTH INSURANCE 57,240 65,000 65,000 65,000 65,000 - 0%
10-16 LID 1,387 1,500 1,500 1,600 1,600 - 7%
10-17 WORKERS COMPENSATION 11,036 14,500 14,600 16,300 16,300 - 12%
10-19 PENSION 48,123 45,700 45,700 51,400 51,400 - 12%
10-20 OPEB 30,636 27,200 27,200 39,500 39,500 - 45%
PERSONNEL COSTS 438,955 466,200 467,500 494,600 494,600 - 6%
20-26 PROGRAM EXPENSES/SUPPLIES 320,259 275,000 275,000 275,000 325,000 - 18%
20-29 UNIFORMS/UNIFORM ALLOW 1,083 1,400 1,400 1,300 1,200 - -14%
20-31 BOOKS - 600 600 600 600 - 0%
20-32 SECURITY/SAFETY MATERIALS 253 400 400 400 300 - -25%
20-33 SMALL TOOLS 16,798 15,000 15,000 5,000 2,500 - -83%
20-37 COMPUTER SOFTWARE 5,604 5,100 5,100 2,800 2,800 - -45%
20-38 COMPUTER HARDWARE - 1,100 1,100 - - - -100%
20-46 CITY BLDG MAINT SUPPLIES 5,491 5,500 5,500 5,500 5,500 - 0%
MATERIALS & SUPPLIES 349,488 304,100 304,100 290,600 337,900 - 11%
30-21 TELEPHONE/FAX 614 1,100 1,100 1,200 800 - -27%
30-28 TRAINING/CONF/FOOD/TRAVEL 774 2,000 2,000 2,000 1,000 - -50%
30-31 CONTRACTUAL SERVICES 40 500 500 500 100 - -80%
30-43 ENVIRONMENTAL EXPENSES 200 200 200 200 200 - 0%
30-62 GASOLINE 1,594 1,800 1,800 1,800 1,800 - 0%
30-67 RADIO REPAIRS/MAINTENANCE 249 400 400 400 300 - -25%
ADMINISTRATIVE EXPENDITURES 3,470 6,000 6,000 6,100 4,200 - -30%
OPERATING EXPENDITURES 791,913 776,300 777,600 791,300 836,700 - 8%
40-23 TRUCKS - PURCHASE 84,234 31,000 31,000 27,000 - - -100%
CAPITAL OUTLAY 84,234 31,000 31,000 27,000 - - -100%
TOTAL EXPENDITURES $ 876,147 $ 807,300 $ 808,600 $ 818,300 $ 836,700 $ - 4%
REVENUES
GENERAL FUND $ 791,913 $ 776,300 $ 777,600 $ 791,300 $ 836,700 $ -
GOV. CAPITAL PROJECT FUND 84,234 31,000 31,000 27,000 - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 6.0 6.0
277
Page 283
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GROUNDS
110-1500-522
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 428,650 $ 495,400 $ 468,300 $ 487,000 $ 487,000 $ - -2%
10-12 OVERTIME 12,687 12,200 12,200 12,200 10,000 - -18%
10-14 FICA TAXES 31,944 38,800 38,800 38,200 38,000 - -2%
10-15 HEALTH INSURANCE 117,830 165,000 165,000 141,700 141,700 - -14%
10-16 L I D INSURANCE 2,232 2,800 2,800 2,800 2,800 - 0%
10-17 WORKERS COMPENSATION 18,022 25,500 25,500 27,500 27,400 - 7%
10-19 PENSION 126,278 165,900 165,900 132,100 132,100 - -20%
10-20 OPEB 47,968 47,800 47,800 66,400 66,400 - 39%
PERSONNEL COSTS 785,610 953,400 926,300 907,900 905,400 - -5%
20-25 CUSTODIAL 12 300 300 300 200 - -33%
20-26 PROGRAM EXPENSES/SUPPLIES 36,270 41,000 40,700 41,000 35,000 - -15%
20-29 UNIFORMS/UNIFORM ALLOW 2,200 3,400 3,400 3,100 2,800 - -18%
20-32 SECURITY/SAFETY MATERIALS 848 1,600 1,600 1,600 1,600 - 0%
20-33 SMALL TOOLS 2,433 3,000 3,000 5,500 3,000 - 0%
20-38 COMPUTER HARDWARE 197 - 300 - - - 0%
20-44 SAND AND SALT - 400 400 400 400 - 0%
20-46 CITY BLDG MAINT SUPPLIES 328 500 500 500 500 - 0%
20-58 WATER/SEWER 2,297 3,000 3,000 3,000 2,400 - -20%
MATERIALS & SUPPLIES 44,586 53,200 53,200 55,400 45,900 - -14%
30-21 TELEPHONE/FAX 822 1,100 1,100 1,200 900 - -18%
30-23 ELECTRICITY 3,650 4,000 4,000 4,000 4,000 - 0%
30-24 HEATING OIL/GAS 3,204 6,000 6,000 6,000 3,200 - -47%
30-27 SUBSCRIPTIONS AND DUES 272 500 500 700 700 - 40%
30-28 TRAINING/CONF/FOOD/TRAVEL 1,872 1,600 1,600 1,600 1,600 - 0%
30-31 CONTRACTUAL SERVICES 151,422 112,800 139,900 116,600 112,800 - 0%
30-43 ENVIRONMENTAL EXPENSES 3,585 3,700 3,700 4,100 4,100 - 11%
30-44 AGENCY BILLING-TEMP HELP 33,280 31,000 31,000 31,000 31,000 - 0%
30-62 GASOLINE 15,336 18,000 18,000 18,000 18,000 - 0%
30-65 MAINT EQUIP REPAIRS/MAINT 12,220 15,000 15,000 15,000 12,000 - -20%
30-67 RADIO REPAIRS/MAINTENANCE 996 1,000 1,000 1,000 1,000 - 0%
ADMINISTRATIVE EXPENDITURES 226,658 194,700 221,800 199,200 189,300 - -3%
OPERATING EXPENSES 1,056,855 1,201,300 1,201,300 1,162,500 1,140,600 - -5%
40-23 TRUCKS - PURCHASE - 31,200 126,800 - - - -100%
40-24 MAINT EQUIP - PURCHASE 68,352 27,000 27,000 62,500 62,500 - 131%
CAPITAL OUTLAY 68,352 58,200 153,800 62,500 62,500 - 7%
TOTAL EXPENDITURES $ 1,125,207 $ 1,259,500 $ 1,355,100 $ 1,225,000 $ 1,203,100 $ - -4%
REVENUES
GENERAL FUND $ 1,056,855 $ 1,201,300 $ 1,201,300 $ 1,162,500 $ 1,140,600 $ -
GOV. CAPITAL PROJECT FUND 68,352 58,200 153,800 62,500 62,500 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 13.0 13.0 13.0 13.0 13.0
278
Page 284
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
SANITATION
110-1800-555
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 371,659 $ 382,100 $ 385,300 $ 394,800 $ 394,800 $ - 3%
10-12 OVERTIME 17,945 17,500 17,500 17,500 17,500 - 0%
10-14 FICA TAXES 28,526 30,500 30,700 31,500 31,500 - 3%
10-15 HEALTH INSURANCE 86,550 111,000 111,000 106,500 106,500 - -4%
10-16 L I D INSURANCE 1,822 1,700 1,700 2,000 2,000 - 18%
10-17 WORKERS COMPENSATION 15,872 20,100 20,300 22,800 22,800 - 13%
10-19 PENSION 101,240 133,100 133,100 142,300 142,300 - 7%
10-20 OPEB 41,211 36,900 36,900 53,900 53,900 - 46%
PERSONNEL COSTS 664,826 732,900 736,500 771,300 771,300 - 5%
20-26 PROGRAM EXPENSES/SUPPLIES 23,664 20,000 25,000 30,000 30,000 - 50%
20-29 UNIFORMS/UNIFORM ALLOW 1,804 2,900 2,900 2,600 2,000 - -31%
20-32 SECURITY/SAFETY MATERIALS 929 1,000 1,000 1,000 1,000 - 0%
20-33 SMALL TOOLS 330 300 300 300 300 - 0%
20-38 COMPUTER HARDWARE 197 - - - - - 0%
20-46 CITY BLDG MAINT SUPPLIES 498 500 500 500 500 - 0%
MATERIALS & SUPPLIES 27,423 24,700 29,700 34,400 33,800 - 37%
30-21 TELEPHONE/FAX 422 300 300 300 500 - 67%
30-25 ADVERTISEMENT 710 700 700 700 700 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 427 100 100 100 100 - 0%
30-31 CONTRACTUAL SERVICES 1,278,818 1,157,800 1,152,800 1,220,500 1,649,100 - 42%
30-43 ENVIRONMENTAL EXPENSES 1,445 5,000 5,000 5,000 2,000 - -60%
30-44 AGENCY BILLING-TEMP HELP 64,163 35,000 35,000 35,000 35,000 - 0%
30-62 GASOLINE 53,481 75,000 75,000 75,000 70,000 - -7%
30-67 RADIO REPAIRS/MAINTENANCE 1,328 1,300 1,300 1,300 1,400 - 8%
ADMINISTRATIVE EXPENDITURES 1,400,794 1,275,200 1,270,200 1,337,900 1,758,800 - 38%
OPERATING EXPENSES 2,093,043 2,032,800 2,036,400 2,143,600 2,563,900 - 26%
40-23 TRUCKS - PURCHASE 402,484 261,500 261,500 435,100 - - -100%
CAPITAL OUTLAY 402,484 261,500 261,500 435,100 - - -100%
TOTAL EXPENDITURES $2,495,527 $2,294,300 $ 2,297,900 $ 2,578,700 $ 2,563,900 $ - 12%
REVENUES
GENERAL FUND $ 2,093,043 $ 2,032,800 $ 2,036,400 $ 2,143,600 $ 2,563,900 $ -
GOV. CAPITAL PROJECT FUND 402,484 261,500 261,500 435,100 - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 10.0 10.0 10.0 10.0 10.0
279
Page 285
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
STREET
110-1800-554
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 256,296 $ 308,500 $ 310,800 $ 325,200 $ 325,200 $ - 5%
10-12 OVERTIME 7,457 7,900 7,900 7,900 7,900 - 0%
10-14 FICA TAXES 18,776 24,200 24,400 25,500 25,500 - 5%
10-15 HEALTH INSURANCE 80,748 118,700 118,700 126,500 126,500 - 7%
10-16 L I D INSURANCE 1,402 1,800 1,800 1,800 1,800 - 0%
10-17 WORKERS COMPENSATION 10,752 15,900 16,000 18,400 18,400 - 16%
10-19 PENSION 47,390 82,200 82,200 106,900 106,900 - 30%
10-20 OPEB 29,641 29,800 29,800 44,300 44,300 - 49%
PERSONNEL COSTS 452,462 589,000 591,600 656,500 656,500 - 11%
20-26 PROGRAM EXPENSES/SUPPLIES 56,683 186,900 194,600 358,400 139,700 - -25%
20-29 UNIFORMS/UNIFORM ALLOW 1,473 2,000 2,000 1,900 1,900 - -5%
20-32 SECURITY/SAFETY MATERIALS 1,131 1,500 1,500 1,500 1,100 - -27%
20-33 SMALL TOOLS 1,894 2,500 2,500 12,500 7,500 - 200%
20-38 COMPUTER HARDWARE 197 1,100 1,100 - - - -100%
20-41 STREET REPAIRING MATERIAL 9,196 10,000 10,000 10,000 10,000 - 0%
20-42 STREET CLEANING SUPPLIES 2,850 3,000 3,000 3,000 3,000 - 0%
20-43 STREET SIGNS/MARKING 14,648 16,000 16,000 16,400 14,600 - -9%
20-44 SAND AND SALT 9,667 13,800 13,800 13,800 12,500 - -9%
20-46 CITY BLDG MAINT SUPPLIES 173 200 200 200 200 - 0%
20-62 STORM SEWER SUPPLIES 5,841 10,000 10,000 10,000 7,500 - -25%
MATERIALS & SUPPLIES 103,752 247,000 254,700 427,700 198,000 - -20%
30-21 TELEPHONE/FAX 1,021 800 800 800 1,000 - 25%
30-25 ADVERTISEMENT 1,449 700 700 700 700 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 482 100 100 200 200 - 100%
30-29 CONSULTING FEES 765 1,500 2,800 1,500 1,000 - -33%
30-31 CONTRACTUAL SERVICES 580 264,900 255,900 259,900 204,500 - -23%
30-43 ENVIRONMENTAL EXPENSES 1,718 2,000 2,000 2,000 2,000 - 0%
30-44 AGENCY BILLING-TEMP HELP 19,598 15,000 15,000 15,000 20,000 - 33%
30-62 GASOLINE 26,672 38,000 38,000 38,000 30,000 - -21%
30-65 MAINT EPUIP REPAIRS/MAINT 4,932 3,000 3,000 3,000 3,000 - 0%
30-67 RADIO REPAIRS/MAINTENANCE 1,577 1,500 1,500 1,500 1,500 - 0%
30-99 SNOW EMERGENCY 52,564 - - - - - 0%
ADMINISTRATIVE EXPENDITURES 111,359 327,500 319,800 322,600 263,900 - -19%
OPERATING EXPENDITURES 667,574 1,163,500 1,166,100 1,406,800 1,118,400 - -4%
40-23 TRUCKS - PURCHASE - - 46,000 170,200 - - 0%
40-25 OTHER EPUIPMENT PURCHASE - - - 163,700 - - 0%
40-31 CONSTRUCTION - PURCHASE 2,918,713 1,026,000 1,796,600 4,776,600 1,070,000 - 4%
CAPITAL OUTLAY 2,918,713 1,026,000 1,842,600 5,110,500 1,070,000 - 4%
TOTAL EXPENDITURES $ 3,586,286 $ 2,189,500 $ 3,008,700 $ 6,517,300 $ 2,188,400 $ - 0%
REVENUES
GENERAL FUND $ 667,574 $ 1,163,500 $ 1,166,100 $ 1,406,800 $ 1,118,400 $ -
GOV. CAPITAL PROJECT FUND 2,918,713 1,026,000 1,842,600 5,110,500 1,070,000 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 8.0 8.0 8.0 8.0 8.0
280
Page 288
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY MANAGER
DEPARTMENT OF PUBLIC WORKS - WATER / WASTEWATER FUND
FISCAL YEAR 2018 ORGANIZATION CHART
PUBLIC WORKS DIRECTOR / CITY ENGINEER
1 (accounted for in Public Works Administration)
WATER WASTEWATER WATER TREATMENT WATER / WASTEWATER
MANAGEMENT MANAGEMENT & PRODUCTION ENG. & INSPECTIONS
PUBLIC WORKS OPERATIONS MANAGER WATER / WW MANAGER
1 (accounted for in Public Works Administration) 1
WATER / WASTEWATER MAINTENANCE SUPERVISOR WATER PROD. SUPER. CIVIL ENGINEER II
1 (accounted for in Water Management) 1 2
UTIL. CON. CREW LEADER UTILITY MAINT. MECH. II WATER TR. PLANT OP. II CONSTRUCTION MGR.
1 3 4 1
CREW LEADER UTILITY MAINT. MECH. I UTILITY MAINT. MECH. II PUBLIC WORKS INSPECT.
1 3 1 1
HEAVY EQUIP. OPER. I WATER SERVICE PERSON WATER TR. PLANT OP. I 5
1 1 7
MOTOR EQUIP. OPER. III MOTOR EQUIP. OPER. II 13
1 2
MOTOR EQUIP. OPER. II MOTOR EQUIP. OPER. I
1 2
35
6 11
283
Page 289
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER/WASTEWATER ENGINEERING
412/417-2600-553
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 310,405 $ 311,800 $ 316,800 $ 311,800 $ 317,200 $ - 2%
10-12 OVERTIME - 1,000 1,000 500 500 - -50%
10-14 FICA TAXES 23,003 23,900 24,300 23,900 24,300 - 2%
10-15 HEALTH INSURANCE 48,506 52,000 52,000 46,700 46,700 - -10%
10-16 L I D INSURANCE 1,628 1,900 1,900 2,000 2,000 - 5%
10-17 WORKERS COMPENSATION 1,366 1,300 1,300 1,400 1,500 - 15%
10-19 PENSION 45,943 49,900 49,900 50,600 50,900 - 2%
10-20 OPEB 18,019 11,800 11,800 6,800 7,000 - -41%
PERSONNEL COSTS 448,870 453,600 459,000 443,700 450,100 - -1%
20-22 OFFICE SUPPLIES 3,674 2,700 2,700 2,700 2,700 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 200 200 200 200 200 - 0%
20-31 BOOKS 48 800 800 800 500 - -38%
20-32 SECURITY/SAFETY MATERIALS - 300 300 200 200 - -33%
20-33 SMALL TOOLS 92 100 100 500 500 - 400%
20-37 COMPUTER SOFTWARE 9,851 9,800 9,800 9,800 9,800 - 0%
20-38 COMPUTER HARDWARE 197 2,400 2,400 2,700 2,700 - 13%
MATERIALS & SUPPLIES 14,062 16,300 16,300 16,900 16,600 - 2%
30-21 TELEPHONE/FAX 1,238 1,700 1,700 1,700 1,300 - -24%
30-27 SUBSCRIPTIONS AND DUES 570 4,100 4,100 4,100 4,100 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 1,110 1,100 1,100 14,800 7,500 - 582%
30-31 CONTRACTUAL SERVICES 28,584 35,000 35,000 35,000 30,000 - -14%
30-39 IN-HOUSE TRAINING 1,706 1,500 1,500 1,800 1,500 - 0%
30-62 GASOLINE 2,849 2,800 2,800 2,800 2,500 - -11%
30-67 RADIO REPAIRS/MAINTENANCE 249 400 400 400 400 - 0%
ADMINISTRATIVE EXPENDITURES 36,307 46,600 46,600 60,600 47,300 - 2%
OPERATING EXPENDITURES 499,239 516,500 521,900 521,200 514,000 - 0%
40-23 TRUCKS - PURCHASE - 30,400 30,400 - - - -100%
CAPITAL OUTLAY - 30,400 30,400 - - - -100%
TOTAL EXPENDITURES $ 499,239 $ 546,900 $ 552,300 $ 521,200 $ 514,000 $ - -6%
REVENUES
WATER/WASTEWATER FUND $ 499,239 $ 516,500 $ 521,900 $ 521,200 $ 514,000 $ -
WATER/WASTEWATER I & E FUND - 30,400 30,400 - - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 5.0
284
Page 290
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER MANAGEMENT
412/417-6800-568
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 281,445 $ 289,200 $ 291,000 $ 295,800 $ 295,800 $ - 2%
10-12 OVERTIME 13,151 12,000 12,000 12,000 12,000 - 0%
10-14 FICA TAXES 21,306 23,000 23,100 23,500 23,500 - 2%
10-15 HEALTH INSURANCE 76,661 78,000 78,000 67,700 67,700 - -13%
10-16 L I D INSURANCE 1,463 1,600 1,600 1,600 1,600 - 0%
10-17 WORKERS COMPENSATION 11,990 15,200 15,300 17,100 17,100 - 13%
10-19 PENSION 98,158 97,700 97,700 104,100 104,100 - 7%
10-20 OPEB 21,829 10,700 10,700 6,300 6,300 - -41%
PERSONNEL COSTS 526,004 527,400 529,400 528,100 528,100 - 0%
20-28 MEDICAL SUP & PHYSICALS 175 2,500 2,500 2,500 2,500 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 1,171 1,400 1,400 1,300 1,200 - -14%
20-32 SECURITY/SAFETY MATERIALS 403 1,300 1,300 1,300 1,000 - -23%
20-33 SMALL TOOLS 5,084 5,500 5,500 8,300 7,800 - 42%
20-38 COMPUTER HARDWARE 99 1,100 1,100 - - - -100%
20-51 WATER/SEWER SYSTEM SUP 39,963 50,000 50,000 50,000 45,000 - -10%
20-53 METERS/METER SUPPLIES 9,998 10,000 30,000 10,000 10,000 - 0%
20-54 PUMPING STATION SUPPLIES 215 - - - - - 0%
MATERIALS & SUPPLIES 57,108 71,800 91,800 73,400 67,500 - -6%
30-21 TELEPHONE/FAX 4,320 4,000 4,000 4,000 4,000 - 0%
30-25 ADVERTISEMENT 2,684 2,500 2,500 2,500 2,500 - 0%
30-27 SUBSCRIPTIONS AND DUES 2,964 2,900 2,900 3,000 3,000 - 3%
30-28 TRAINING/CONF/FOOD/TRAVEL 2,683 1,800 1,800 3,400 2,800 - 56%
30-29 CONSULTING FEES - 2,000 2,000 2,000 - - -100%
30-31 CONTRACTUAL SERVICES 5,092 25,000 25,000 20,000 10,000 - -60%
30-62 GASOLINE 13,670 16,000 16,000 16,000 14,000 - -13%
30-64 TRUCK REPAIRS/MAINTENANCE 3,079 - - - - - 0%
30-65 MAINT EQUIP REPAIRS/MAINT 417 1,000 1,000 1,000 500 - -50%
30-67 RADIO REPAIRS/MAINTENANCE 855 1,000 1,000 1,000 1,000 - 0%
ADMINISTRATIVE EXPENDITURES 35,764 56,200 56,200 52,900 37,800 - -33%
OPERATING EXPENDITURES 618,876 655,400 677,400 654,400 633,400 - -3%
40-23 TRUCKS - PURCHASE 59,832 132,200 178,300 186,500 - - -100%
40-24 MAINT EQUIP - PURCHASE - 12,800 12,800 - 156,300 - 1121%
40-25 OTHER EQUIP - PURCHASE - 200,000 200,000 229,000 216,100 - 8%
40-31 CONSTRUCTION - PURCHASE 1,750,655 993,800 3,467,000 1,270,200 1,186,000 - 19%
40-91 ECON. DEVEL PROJECTS - - 50,000 - 50,000 - 0%
CAPITAL OUTLAY 1,810,487 1,338,800 3,908,100 1,685,700 1,608,400 - 20%
TOTAL EXPENDITURES $ 2,429,363 $ 1,994,200 $ 4,585,500 $ 2,340,100 $ 2,241,800 $ - 12%
REVENUES
WATER/WASTEWATER FUND $ 618,876 $ 655,400 $ 677,400 $ 654,400 $ 633,400 $ -
WATER/WASTEWATER I & E FUND 1,810,487 1,338,800 3,908,100 1,685,700 1,608,400 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 6.0 6.0
285
Page 291
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WASTEWATER MANAGEMENT
412/417-6900-569
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 280,222 $ 396,100 $ 397,100 $ 406,700 $ 406,700 $ - 3%
10-12 OVERTIME 14,596 25,000 25,000 25,000 25,000 - 0%
10-14 FICA TAXES 20,826 32,200 32,300 33,000 33,000 - 2%
10-15 HEALTH INSURANCE 68,910 123,000 123,000 113,000 113,000 - -8%
10-16 L I D INSURANCE 1,434 2,000 2,000 2,200 2,200 - 10%
10-17 WORKERS COMPENSATION 11,491 21,200 21,200 23,800 23,800 - 12%
10-19 PENSION 37,893 40,300 40,300 56,000 56,000 - 39%
10-20 OPEB 21,239 14,600 14,600 8,700 8,700 - -40%
PERSONNEL COSTS 456,610 654,400 655,500 668,400 668,400 - 2%
20-28 MEDICAL SUP & PHYSICALS - 4,200 4,200 4,200 4,200 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 2,054 3,000 3,000 2,900 2,200 - -27%
20-32 SECURITY/SAFETY MATERIALS 996 3,600 3,600 3,600 2,500 - -31%
20-33 SMALL TOOLS 4,954 5,000 5,000 7,800 6,800 - 36%
20-35 CHEMICALS & ADDITIVES 1,378 2,000 2,000 2,000 1,500 - -25%
20-37 COMPUTER SOFTWARE 3,600 3,600 3,600 3,600 3,600 - 0%
20-38 COMPUTER HARDWARE 99 1,100 1,100 600 600 - -45%
20-46 CITY BLDG MAINT SUPPLIES 372 500 500 500 500 - 0%
20-51 WATER/SEWER SYSTEM SUP 10,841 16,000 16,000 16,000 14,000 - -13%
20-53 METERS/METER SUPPLIES 9,960 10,000 30,000 10,000 10,000 - 0%
20-54 PUMPING STATION SUPPLIES 35,964 38,000 38,000 38,000 35,000 - -8%
20-58 WATER/SEWER 1,330 1,200 1,200 1,200 1,300 - 8%
MATERIALS & SUPPLIES 71,549 88,200 108,200 90,400 82,200 - -7%
30-21 TELEPHONE/FAX 4,396 4,000 4,000 5,500 5,000 - 25%
30-23 ELECTRICITY 146,981 145,000 145,000 145,000 140,000 - -3%
30-24 HEATING OIL/GAS 1,172 - - - - - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 70 100 100 1,400 1,000 - 900%
30-29 CONSULTING FEES 412 2,000 2,000 2,000 - - -100%
30-31 CONTRACTUAL SERVICES 79,254 52,500 52,500 52,500 52,500 - 0%
30-62 GASOLINE 12,138 15,000 15,000 15,000 12,500 - -17%
30-64 TRUCK REPAIRS/MAINTENANCE 27 - - - - - 0%
30-65 MAINT EQUIP REPAIRS/MAINT 801 600 600 600 600 - 0%
30-67 RADIO REPAIRS/MAINTENANCE 664 600 600 600 600 - 0%
ADMINISTRATIVE EXPENDITURES 245,915 219,800 219,800 222,600 212,200 - -3%
OPERATING EXPENDITURES 774,075 962,400 983,500 981,400 962,800 - 0%
40-23 TRUCKS - PURCHASE 245,819 - - 30,200 - - 0%
40-24 MAINT EQUIP REPAIRS/MAINT 64,223 47,200 47,200 - - - -100%
40-25 OTHER EQUIPMENT - 200,000 200,000 264,000 251,100 - 26%
40-31 CONSTRUCTION - PURCHASE 2,735,845 1,774,000 3,707,500 2,174,300 1,241,900 - -30%
40-91 ECON. DEVEL PROJECTS - - 50,000 - 50,000 - 0%
CAPITAL OUTLAY 3,045,887 2,021,200 4,004,700 2,468,500 1,543,000 - -24%
TOTAL EXPENDITURES $ 3,819,962 $ 2,983,600 $ 4,988,200 $ 3,449,900 $ 2,505,800 $ - -16%
REVENUES
WATER/WASTEWATER FUND $ 774,075 $ 962,400 $ 983,500 $ 981,400 $ 962,800 $ -
WATER/WASTEWATER I & E FUND 3,045,887 2,021,200 4,004,700 2,468,500 1,543,000 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 11.0 11.0 11.0 11.0 11.0
286
Page 292
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER TREATMENT PLANT
412/417-7600-576
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 545,165 $ 589,400 $ 597,800 $ 608,700 $ 608,700 $ - 3%
10-12 OVERTIME 45,843 30,000 30,000 30,000 30,000 - 0%
10-14 FICA TAXES 42,680 47,400 48,000 48,800 48,800 - 3%
10-15 HEALTH INSURANCE 159,266 189,600 189,600 185,000 185,000 - -2%
10-16 L I D INSURANCE 2,806 3,200 3,200 3,200 3,200 - 0%
10-17 WORKERS COMPENSATION 24,095 31,200 31,600 35,400 35,400 - 13%
10-19 PENSION 124,118 127,100 127,100 159,500 159,500 - 25%
10-20 OPEB 43,713 22,200 22,200 13,300 13,300 - -40%
PERSONNEL COSTS 987,688 1,040,100 1,049,500 1,083,900 1,083,900 - 4%
20-25 CUSTODIAL 693 600 600 600 600 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 4,044 5,100 5,100 4,800 4,500 - -12%
20-32 SECURITY/SAFETY MATERIALS 1,565 2,000 2,000 2,000 2,000 - 0%
20-33 SMALL TOOLS 3,965 4,500 4,500 4,500 4,300 - -4%
20-35 CHEMICALS & ADDITIVES 124,713 130,000 130,000 140,000 130,000 - 0%
20-38 COMPUTER HARDWARE 197 3,100 3,100 - - - -100%
20-46 CITY BLDG MAINT SUPPLIES 2,135 2,500 2,500 7,500 7,500 - 200%
20-49 WELL SUPPLIES/REHAB 11,907 12,000 12,000 12,000 12,000 - 0%
MATERIALS & SUPPLIES 149,220 159,800 159,800 171,400 160,900 - 1%
30-21 TELEPHONE/FAX 460 500 500 500 500 - 0%
30-23 ELECTRICITY 429,648 440,000 440,000 455,000 425,000 - -3%
30-24 HEATING OIL/GAS 4,802 6,000 6,000 6,000 5,000 - -17%
30-25 ADVERTISEMENT 836 500 500 500 - - -100%
30-27 SUBSCRIPTIONS AND DUES 600 700 700 700 700 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 549 700 700 700 700 - 0%
30-31 CONTRACTUAL SERVICES 56,069 59,800 59,800 83,800 83,800 - 40%
30-62 GASOLINE 6,100 9,000 9,000 9,000 8,000 - -11%
30-66 OTHER EQUIP REPAIRS/MAINT 11,115 10,000 10,000 12,000 10,000 - 0%
30-67 RADIO REPAIRS/MAINTENANCE 166 300 300 300 300 - 0%
ADMINISTRATIVE EXPENDITURES 510,345 527,500 527,500 568,500 534,000 - 1%
OPERATING EXPENDITURES 1,647,253 1,727,400 1,736,800 1,823,800 1,778,800 - 3%
40-23 TRUCKS - PURCHASE - - - 28,100 - - 0%
40-31 CONSTRUCTION PURCHASES 246,052 1,200,000 1,200,000 1,570,000 - - -100%
CAPITAL OUTLAY 246,052 1,200,000 1,200,000 1,598,100 - - -100%
TOTAL EXPENDITURES $ 1,893,305 $ 2,927,400 $ 2,936,800 $ 3,421,900 $ 1,778,800 $ - -39%
REVENUES
WATER/WASTEWATER FUND $ 1,647,253 $ 1,727,400 $ 1,736,800 $ 1,823,800 $ 1,778,800 $ -
WATER/WASTEWATER I & E FUND 246,052 1,200,000 1,200,000 1,598,100 - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 13.0 13.0 13.0 13.0 13.0
287
Page 294
FY2018 ANNUALOPERATING BUDGET— DOVER, DELAWARE
Electric Division
Fiscal Year 2018 Organizational Chart
City Manager
Electric
Electric Director Key Accounts Representative
1 1
Electric Transmission
Administration System Operations Electric Engineering & Distribution Generation
Administrative Assistant System Ops Crew Leader Eng Svcs & System Ops Super. Line Crew Superintendent Generation Manager
1 1 1 1 1
Electric Meter Tech Crew Leader/Foreman
Account Clerk II System Operators II Electrical Engineer I 1
1 4 1
Electric Meter Tech II
Electrical Engineer I 1
1
Electric Meter Tech I
1
SCADA Tech
1 Journeyman-1st Class Lineman
8
Substation Tech. Crew Leader
1
Lineman Second Class
5
Substation Technician II
2
Lineman Third Class
Electric Draftsman III 2
1
Lineman Crew Leader
Engineering Crew Leader 3
1
Groundworker
Engineering Fieldworker 1
2
T & D/Engineering Coordinator
Electric Intern 1
1
289
Page 295
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
POWER PLANT OPERATIONS
480/487-8101-591
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES & WAGES $ 2,203,821 $ 2,400,400 $ 2,350,400 $ 2,350,800 $ 2,350,800 $ - -2%
10-12 OVERTIME 238,400 185,500 215,500 264,500 185,500 - 43%
10-18 EDUCATIONAL ASSISTANCE - 2,500 2,500 2,500 - - 0%
10-24 BURDEN @ 40% 688,243 1,065,600 1,035,600 980,600 980,600 - -8%
PERSONNEL COSTS 3,130,464 3,654,000 3,604,000 3,598,400 3,516,900 - -2%
20-22 OFFICE SUPPLIES/SUBSCRIPT 7,017 7,000 7,000 7,000 7,000 - 0%
20-23 PRINTING & DUPLICATING 4,277 2,500 2,500 2,500 2,500 - 0%
20-25 JANITORIAL SERV/SUPPLIES 35,754 35,000 35,000 37,000 35,000 - 6%
20-28 MEDICAL SUPPLIES - 2,400 2,400 2,400 2,400 - 0%
20-29 UNIFORMS/UNIFORM ALLOW 15,290 10,000 10,000 12,000 12,000 - 20%
20-32 SECURITY/SAFETY MATERIALS 8,034 13,200 13,200 12,200 12,200 - -8%
20-33 SMALL TOOLS 1,663 1,900 1,900 1,900 1,900 - 0%
20-35 WATER TREATMENT CHEMICALS 37,378 31,900 31,900 30,900 30,900 - -3%
20-37 COMPUTER SOFTWARE 8,245 9,100 9,100 9,800 9,100 - 8%
20-38 COMPUTER HARDWARE 3,744 4,700 4,700 5,800 - - 23%
20-46 CITY BUILDING MAINTENANCE 36,798 42,500 42,500 54,000 34,000 - 27%
20-58 WATER/SEWER 45,987 84,000 134,000 140,000 84,000 - 67%
MATERIALS & SUPPLIES 204,188 244,200 294,200 315,500 231,000 - 29%
30-19 OPERATOR INSURANCE 409,055 405,500 470,500 479,900 470,500 - 18%
30-21 TELEPHONE 6,199 9,000 9,000 9,000 9,000 - 0%
30-22 POSTAGE 8,253 9,000 9,000 9,000 9,000 - 0%
30-23 ELECTRICITY 546,417 550,000 550,000 630,000 550,000 - 15%
30-24 HEATING OIL/GAS 43,893 40,000 40,000 45,000 40,000 - 13%
30-28 TRAINING/CONF/FOOD/TRAVEL 53,195 66,500 66,500 93,800 54,000 - 41%
30-31 CONTRACTUAL SERVICES 156,109 76,300 76,300 83,000 80,500 - 9%
30-43 ENVIRONMENT EXPENSES 114,807 104,000 104,000 166,500 146,500 - 60%
30-45 OPERATOR MANAGEMENT FEE 800,696 781,300 781,300 792,700 792,700 - 1%
30-47 HOME OFFICE LABOR 31,800 15,000 15,000 20,000 15,000 - 33%
30-51 RIGHT OF WAY/PERMITS 36,650 36,900 36,900 36,900 36,900 - 0%
30-62 GASOLINE 1,597 2,000 2,000 2,000 2,000 - 0%
30-66 OTHER EQUIPT/MAINTENANCE 45,567 41,700 41,700 41,700 41,700 - 0%
30-67 RADIO REPAIRS/MAINTENANCE 496 6,500 6,500 3,500 3,500 - -46%
30-80 AUXILLARY SYSTEMS 53,169 44,600 44,600 44,600 44,600 - 0%
30-81 BOILER SYSTEMS 29,065 47,000 47,000 47,000 47,000 - 0%
30-82 CONTINUOUS EMISSIONS MONI 1,527 4,000 4,000 4,000 4,000 - 0%
30-83 DCS CONTROL SYSTEM 1,866 9,700 9,700 9,700 9,700 - 0%
30-84 FIRE PROTECTION SYSTEM 7,750 22,500 22,500 14,500 10,000 - -36%
30-85 COOLING TOWER 3,202 5,000 5,000 5,000 5,000 0%
30-86 FUEL OIL/GAS SYSTEMS 191 3,000 3,000 3,000 3,000 - 0%
30-87 COMBUSTION TURBINE MAINT 37,612 18,000 18,000 12,000 12,000 - -33%
30-88 POWER DISTRIBUTION SYSTEM 6,539 10,000 10,000 10,000 7,000 - 0%
30-89 TURBINE GENERATOR SYSTEMS 4,550 10,000 10,000 10,000 5,000 - 0%
ADMINISTRATIVE EXPENDITURES 2,400,203 2,317,500 2,382,500 2,572,800 2,398,600 - 11%
OPERATING EXPENDITURES 5,734,855 6,215,700 6,280,700 6,486,700 6,146,500 - 4%
40-23 TRUCK - PURCHASES - 65,800 65,800 - - - -100%
40-25 OTHER EQUIP-PURCHASE - 59,000 59,000 - - - -100%
40-31 CONSTRUCTION-PURCHASE 964,880 1,718,000 2,264,300 2,990,000 2,328,000 - 74%
CAPITAL OUTLAY 964,880 1,842,800 2,389,100 2,990,000 2,328,000 - 62%
TOTAL EXPENDITURES $ 6,699,736 $ 8,058,500 $ 8,669,800 $ 9,476,700 $ 8,474,500 $ - 18%
REVENUES
ELECTRIC FUND - OPERATING $ 5,734,855 $ 6,215,700 $ 6,280,700 $ 6,486,700 $ 6,146,500 $ -
ELECTRIC I & E FUND - CIP 964,880 1,842,800 2,389,100 2,990,000 2,328,000 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 27.0 27.0 27.0 27.0 27.0
290
Page 296
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
POWER SUPPLY
480/487-8102-592
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
30-31 CONTRACTUAL SERVICES $ - $ - $ - $ - $ 100,000 $ - 0%
30-32 LEGAL EXPENSES - - - - 25,000 - 0%
65-44 OPERATOR/SUPPLY MGMT FEE 996,000 996,000 835,000 835,000 835,000 - -16%
65 SERIES TOTAL 996,000 996,000 835,000 835,000 960,000 - -4%
95-48 3RD PARTY HEDGE PURCHASES 23,610,686 16,557,600 19,489,500 22,807,900 22,807,900 - 38%
95-49 CAPACITY CHARGES 10,574,198 10,160,600 10,428,800 10,482,500 10,482,500 - 3%
95-50 CAPACITY CREDITS (9,827,426) (7,355,100) (7,364,400) (7,120,100) (7,120,100) - -3%
95-58 SOLAR POWER SUPPLY 2,280,044 2,313,900 2,454,200 2,661,300 2,661,300 - 15%
95-59 SOLAR RENEWAL ENERGY CREDIT 344,577 363,400 359,500 371,200 371,200 - 2%
95-60 RENEWABLE ENERGY CREDITS 586,169 673,400 673,200 578,300 578,300 - -14%
95-61 REGIONAL GREENHOUSE GAS 66,080 129,300 41,400 64,000 64,000 - -51%
95-90 PJM CHARGES - TRANS. & FEES 5,247,660 7,603,800 6,036,700 6,900,200 6,900,200 - -9%
95-91 PJM CHARGES - ENERGY 2,960,596 12,357,900 6,783,900 6,024,400 6,024,400 - -51%
95-92 PJM CREDITS (617,904) (360,000) (584,500) (535,400) (535,400) - 49%
95-93 PJM SPOT MARKET ENERGY (1,002,972) (804,900) (1,391,800) (1,606,000) (958,100) - 19%
95 SERIES TOTAL 34,221,708 41,639,900 36,926,500 40,628,300 41,276,200 - -1%
98-90 RENEWABLE ENERGY CHARGES 27,180 - - - - - 0%
98-91 GAS FUEL 362,132 302,600 1,255,200 1,614,600 817,400 - 170%
98-93 NO. 2 FUEL OIL 950,376 - 1,100 - - - 0%
98 SERIES TOTAL 1,339,688 302,600 1,256,300 1,614,600 817,400 - 170%
OPERATING EXPENDITURES 36,557,396 42,938,500 39,017,800 43,077,900 43,053,600 - 0%
TOTAL EXPENDITURES $ 36,557,396 $ 42,938,500 $ 39,017,800 $ 43,077,900 $ 43,053,600 $ - 0%
REVENUES
ELECTRIC FUND $ 36,557,396 $ 42,938,500 $ 39,017,800 $ 43,077,900 $ 43,053,600 $ -
291
Page 297
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC TRANSMISSION & DISTRIBUTION
480/487-8200-562
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 1,456,833 $ 1,562,500 $ 1,575,900 $ 1,628,000 $ 1,643,000 $ - 5%
10-12 OVERTIME 112,131 106,800 106,800 106,800 106,800 - 0%
10-14 FICA TAXES 115,919 127,700 128,700 132,700 133,800 - 5%
10-15 HEALTH INSURANCE 229,955 283,500 283,500 256,800 256,800 - -9%
10-16 L I D INSURANCE 5,967 6,400 6,400 6,600 6,700 - 5%
10-17 WORKERS COMPENSATION 63,978 84,100 84,800 96,100 96,900 - 15%
10-19 PENSION 393,330 451,200 451,200 412,300 413,200 - -8%
10-20 OPEB 26,096 30,300 30,300 31,600 31,900 - 5%
PERSONNEL COSTS 2,404,211 2,652,500 2,667,600 2,670,900 2,689,100 - 1%
20-29 UNIFORMS/UNIFORM ALLOW 15,008 23,000 23,000 23,000 23,000 - 0%
20-32 SECURITY/SAFETY MATERIALS 20,202 18,000 18,000 18,000 18,000 - 0%
20-33 SMALL TOOLS 19,980 25,000 25,000 25,000 25,000 - 0%
20-38 COMPUTER HARDWARE 13,658 12,000 13,300 12,000 12,000 - 0%
20-53 METERS/METER SUPPLIES 13,782 24,000 44,000 38,000 38,000 - 58%
20-58 WATER/SEWER 500 300 300 300 500 - 67%
20-61 ELEC MATERIALS/SUPPLIES 316,958 332,300 306,100 337,300 306,100 - -8%
MATERIALS & SUPPLIES 400,087 434,600 429,700 453,600 422,600 - -3%
30-21 TELEPHONE/FAX 1,204 1,400 1,800 1,400 1,400 - 0%
30-23 ELECTRICITY 437 600 600 600 500 - -17%
30-24 HEATING OIL/GAS 3,777 6,000 6,000 6,000 6,000 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 11,450 8,900 8,900 15,600 10,200 - 15%
30-31 CONTRACTUAL SERVICES 366,614 410,900 410,900 410,900 381,000 - -7%
30-43 ENVIRONMENTAL EXPENSES 30,456 28,000 28,000 28,000 28,000 - 0%
30-51 RIGHT OF WAY 5,955 6,000 6,000 6,000 6,000 - 0%
30-62 GASOLINE 28,856 32,000 32,000 32,000 30,000 - -6%
30-64 TRUCK REPAIRS/MAINTENANCE 16,140 15,000 15,000 15,000 15,000 - 0%
30-66 OTHER EQUIP REPAIRS/MAINT 7,055 7,500 7,500 7,500 7,500 - 0%
30-67 RADIO REPAIRS/MAINTENANCE 3,443 2,300 2,300 2,300 2,300 - 0%
ADMINISTRATIVE EXPENDITURES 475,387 518,600 519,000 525,300 487,900 - -6%
OPERATING EXPENDITURES 3,279,685 3,605,700 3,616,300 3,649,800 3,599,600 - 0%
40-23 TRUCKS - PURCHASE 399,941 - - 328,000 335,500 - 0%
40-25 OTHER EQUIP - PURCHASE - 25,000 175,000 150,000 40,000 - 60%
40-31 CONSTRUCTION - PURCHASE - 450,000 - - - - -100%
40-91 UTILITY CONNECTION ASSISTANCE - - 50,000 - 50,000 - 0%
60-31 UG TRANSFORMERS 200,874 500,000 500,000 500,000 285,000 - -43%
60-34 UG CONDUCTORS/DEVICES 479,709 900,000 1,350,000 1,350,000 963,000 - 7%
60-46 METERS 28,927 100,000 100,000 100,000 52,000 - -48%
CAPITAL OUTLAY 1,109,450 1,975,000 2,175,000 2,428,000 1,725,500 - -13%
TOTAL EXPENDITURES $ 4,389,135 $ 5,580,700 $ 5,791,300 $ 6,077,800 $ 5,325,100 $ - -5%
REVENUES
ELECTRIC FUND $ 3,279,685 $ 3,605,700 $ 3,616,300 $ 3,649,800 $ 3,599,600 $ -
ELECTRIC I & E FUND 1,109,450 1,975,000 2,175,000 2,428,000 1,725,500 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 24.0 24.0 24.0 24.0 24.0
292
Page 298
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC ENGINEERING
480/487-8300-563
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 570,599 $ 616,000 $ 618,700 $ 627,000 $ 627,000 $ - 2%
10-12 OVERTIME 5,337 11,100 11,100 11,100 10,000 - -10%
10-13 TEMPORARY HELP - 10,600 10,600 10,600 10,600 - 0%
10-14 FICA TAXES 42,222 48,000 48,200 48,800 48,700 - 1%
10-15 HEALTH INSURANCE 96,876 124,100 124,100 117,800 117,800 - -5%
10-16 L I D INSURANCE 2,209 2,800 2,800 2,800 2,800 - 0%
10-17 WORKERS COMPENSATION 14,100 22,900 23,000 25,700 25,600 - 12%
10-19 PENSION 84,404 93,900 93,900 68,800 68,800 - -27%
10-20 OPEB 12,133 12,100 12,100 12,300 12,300 - 2%
PERSONNEL COSTS 827,881 941,500 944,500 924,900 923,600 - -2%
20-21 FURNITURE/FIXTURES - - 600 - - - 0%
20-29 UNIFORMS/UNIFORM ALLOW 4,005 7,000 7,000 7,000 7,000 - 0%
20-31 BOOKS 119 200 200 200 200 - 0%
20-32 SECURITY/SAFETY MATERIALS 2,272 4,600 4,600 4,600 4,600 - 0%
20-33 SMALL TOOLS 182 2,000 2,000 2,000 1,500 - -25%
20-37 COMPUTER SOFTWARE 2,516 10,600 10,600 10,800 10,800 - 2%
20-38 COMPUTER HARDWARE 3,348 2,600 2,600 13,400 13,400 - 415%
20-61 ELEC MATERIALS/SUPPLIES 17,077 34,000 33,400 34,000 25,000 - -26%
MATERIALS & SUPPLIES 29,520 61,000 61,000 72,000 62,500 - 2%
30-21 TELEPHONE/FAX 19,431 20,000 20,000 20,000 20,000 - 0%
30-23 ELECTRICITY 1,086 1,700 1,700 1,700 1,600 - -6%
30-27 SUBSCRIPTIONS AND DUES 352 400 400 400 400 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 7,148 20,000 20,000 20,000 15,000 - -25%
30-31 CONTRACTUAL SERVICES 98,211 126,000 126,000 186,800 126,000 - 0%
30-43 ENVIRONMENTAL EXPENSES 70,357 60,000 60,000 60,000 60,000 - 0%
30-62 GASOLINE 7,604 10,000 10,000 10,000 9,000 - -10%
30-66 OTHER EQUIP REPAIRS/MAINT 3,644 6,000 6,000 6,000 4,000 - -33%
30-67 RADIO REPAIRS/MAINTENANCE 747 1,300 1,300 1,300 1,000 - -23%
ADMINISTRATIVE EXPENDITURES 208,579 245,400 245,400 306,200 237,000 - -3%
OPERATING EXPENDITURES 1,065,980 1,247,900 1,250,900 1,303,100 1,223,100 - -2%
40-22 AUTOMOBILES - PURCHASE - - - 25,000 - - 0%
40-23 TRUCKS - PURCHASE - 33,200 33,200 - - - -100%
40-25 OTHER EQUIP - PURCHASE 1,200 35,000 35,000 - - - -100%
40-31 CONSTRUCTION - PURCHASE 183,546 167,500 167,500 511,000 241,000 - 44%
50-76 LIGHTING IMPROVEMENTS - 50,000 50,000 50,000 100,000 - 100%
50-83 UG CABLE REPLACEMENT - - 135,000 480,700 - - 0%
50-85 WIRE REPLACEMENT 69KV - - 250,600 - - - 0%
60-46 METERS - AMI - - - 150,000 150,000 - 0%
60-64 FIBER OPTIC ELECTRONIC EQ - - - 69,000 69,000 - 0%
60-82 CAPACITOR INSTALLATIONS - 50,000 50,000 50,000 35,000 - -30%
70-28 DISTRIBUTION AUTOMATION - - - 150,000 - - 0%
70-35 TRANSMISSION/SWITCHES 824,133 75,000 75,000 75,000 50,000 - -33%
70-60 GARRISON SUBSTATION - - - 50,000 50,000 - 0%
80-38 UPGRADE SCADA - 150,000 150,000 - - - -100%
90-25 DISTRIBUTION UPGRADES 426,916 350,000 785,400 2,070,000 620,000 - 77%
90-78 WHITEOAK 69KV REBUILD 169,076 - - - - - 0%
CAPITAL OUTLAY 1,604,872 910,700 1,731,700 3,680,700 1,315,000 - 44%
TOTAL EXPENDITURES $ 2,670,851 $ 2,158,600 $ 2,982,600 $ 4,983,800 $ 2,538,100 $ - 18%
REVENUES
ELECTRIC FUND $ 1,065,980 $ 1,247,900 $ 1,250,900 $ 1,303,100 $ 1,223,100 $ -
ELECTRIC I & E FUND 1,604,872 910,700 1,731,700 3,680,700 1,315,000 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 10.0 10.0 10.0 10.0 10.0
293
Page 299
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC ADMINISTRATION
480/487-8400-564
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 203,222 $ 346,700 $ 346,700 $ 337,500 $ 337,500 $ - -3%
10-14 FICA TAXES 14,915 26,500 26,500 25,800 25,800 - -3%
10-15 HEALTH INSURANCE 32,529 60,500 60,500 69,400 69,400 - 15%
10-16 L I D INSURANCE 1,091 1,800 1,800 1,900 1,900 - 6%
10-17 WORKERS COMPENSATION 659 1,100 1,100 1,100 1,100 - 0%
10-19 PENSION 22,166 33,000 33,000 30,700 30,700 - -7%
10-20 OPEB 3,725 10,100 10,100 11,200 6,800 - -33%
PERSONNEL COSTS 278,306 479,700 479,700 477,600 473,200 - -1%
20-22 OFFICE SUPPLIES 1,015 1,000 1,500 1,000 1,000 - 0%
20-23 PRINTING AND DUPLICATING 8,103 9,000 9,000 9,300 9,000 - 0%
20-28 MEDICAL SUP & PHYSICALS 92 100 100 100 100 - 0%
20-32 SECURITY/SAFETY MATERIALS 4,863 - - - - - 0%
20-37 COMPUTER SOFTWARE 100 200 200 1,000 - - -100%
20-38 COMPUTER HARDWARE 2,419 2,000 5,100 2,000 2,000 - 0%
20-46 CITY BLDG MAINT SUPPLIES 150,555 136,300 136,300 136,300 155,000 - 14%
20-58 WATER/SEWER 743 900 900 900 800 - -11%
MATERIALS & SUPPLIES 167,890 149,500 153,100 150,600 167,900 - 12%
30-21 TELEPHONE/FAX 1,057 1,000 1,900 1,100 1,900 - 90%
30-23 ELECTRICITY 15,337 17,000 17,000 17,000 15,000 - -12%
30-27 SUBSCRIPTIONS AND DUES 64,874 67,300 67,300 67,300 67,300 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL 2,103 2,500 2,500 4,500 3,000 - 20%
30-29 CONSULTING FEES - 25,000 25,000 25,000 - - -100%
30-31 CONTRACTUAL SERVICES 78,048 59,700 59,700 59,700 63,700 - 7%
30-32 LEGAL EXPENSES 103,688 125,000 125,000 125,000 - - -100%
30-35 COMMUNITY RELATIONS EXP - 2,500 2,500 2,500 2,500 - 0%
30-62 GASOLINE 93 500 500 500 300 - -40%
ADMINISTRATIVE EXPENDITURES 265,201 300,500 301,400 302,600 153,700 - -49%
OPERATING EXPENDITURES 711,397 929,700 934,200 930,800 794,800 - -15%
40-25 OTHER EQUIP - PURCHASE - - 13,000 - - - 0%
40-31 CONSTRUCTION - PURCHASE - - 10,000 1,183,700 8,500 - 0%
CAPITAL OUTLAY - - 23,000 1,183,700 8,500 - 0%
TOTAL EXPENDITURES $ 711,397 $ 929,700 $ 957,200 $ 2,114,500 $ 803,300 $ - -14%
REVENUES
ELECTRIC FUND $ 711,397 $ 929,700 $ 934,200 $ 930,800 $ 794,800 $ -
ELECTRIC I & E FUND - - 23,000 1,183,700 8,500 -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 4.0 5.0 5.0 5.0 5.0
294
Page 300
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
METER READING
480/487-8500-565
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 186,073 $ 193,200 $ 194,100 $ 223,100 $ 192,200 $ - -1%
10-12 OVERTIME 15,739 19,100 19,100 24,700 19,100 - 0%
10-13 TEMPORARY HELP 5,787 12,500 12,500 12,500 12,500 - 0%
10-14 FICA TAXES 15,101 17,200 17,300 19,900 17,100 - -1%
10-15 HEALTH INSURANCE 51,688 55,500 55,500 63,400 51,000 - -8%
10-16 L I D INSURANCE 883 1,000 1,000 1,200 1,000 - 0%
10-17 WORKERS COMPENSATION 8,152 8,000 8,000 10,600 8,700 - 9%
10-19 PENSION 45,440 40,400 40,400 59,400 57,700 - 43%
10-20 OPEB 3,324 3,700 3,700 4,300 3,700 - 0%
PERSONNEL COSTS 332,185 350,600 351,600 419,100 $ 363,000 - 4%
20-21 FURNITURE/FIXTURES 331 - - - - - 0%
20-29 UNIFORMS/UNIFORM ALLOW 3,675 4,700 4,700 6,300 4,700 - 0%
20-32 SECURITY/SAFETY MATERIALS - 100 100 100 100 - 0%
20-33 SMALL TOOLS 5,318 6,100 5,400 6,100 5,400 - -11%
20-55 METER READING SUPPLIES 4,601 4,000 4,000 4,000 4,000 - 0%
MATERIALS & SUPPLIES 13,924 14,900 14,200 16,500 14,200 - -5%
30-21 TELEPHONE/FAX 2,036 2,100 2,100 2,100 2,100 - 0%
30-28 TRAINING/CONF/FOOD/TRAVEL - 500 500 500 500 - 0%
30-62 GASOLINE 4,959 5,000 5,000 5,000 5,000 - 0%
30-66 OTHER EQUIP REPAIRS/MAINT 5,300 5,300 6,000 6,000 5,900 - 11%
30-67 RADIO REPAIRS/MAINTENANCE 166 200 200 300 300 - 50%
ADMINISTRATIVE EXPENDITURES 12,461 13,100 13,800 13,900 13,800 - 5%
OPERATING EXPENDITURES 358,571 378,600 379,600 449,500 391,000 - 3%
40-23 TRUCKS - PURCHASE - 41,800 64,800 - - - -100%
CAPITAL OUTLAY - 41,800 64,800 - - - -100%
TOTAL EXPENDITURES $ 358,571 $ 420,400 $ 444,400 $ 449,500 $ 391,000 $ - -7%
REVENUES
ELECTRIC FUND $ 358,571 $ 378,600 $ 379,600 $ 449,500 $ 391,000 $ -
ELECTRIC I & E FUND - 41,800 64,800 - - -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 4.0 4.0 4.0 5.0 4.0
295
Page 301
FY 2018 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
SYSTEM OPERATIONS
480/487-8600-526
2015-2016 2016-2017 2016-2017 2017-2018 2017-2018 2017-2018 %
ACCT DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED APPROVED CHANGE
10-11 SALARIES $ 341,401 $ 344,000 $ 353,400 $ 357,200 $ 357,200 $ - 4%
10-12 OVERTIME 70,385 72,900 72,900 72,900 72,900 - 0%
10-14 FICA TAXES 29,980 31,900 32,600 32,900 32,900 - 3%
10-15 HEALTH INSURANCE 72,389 92,800 92,800 74,600 74,600 - -20%
10-16 L I D INSURANCE 1,340 1,300 1,300 1,400 1,400 - 8%
10-17 WORKERS COMPENSATION 13,033 21,000 21,300 23,800 23,800 - 13%
10-19 PENSION 58,704 81,000 81,000 74,900 74,900 - -8%
10-20 OPEB 6,194 6,800 6,800 7,000 7,000 - 3%
PERSONNEL COSTS 593,428 651,700 662,100 644,700 644,700 - -1%
TOTAL EXPENDITURES $ 593,428 $ 651,700 $ 662,100 $ 644,700 $ 644,700 $ - -1%
REVENUES
ELECTRIC FUND $ 593,428 $ 651,700 $ 662,100 $ 644,700 $ 644,700 $ -
PERSONNEL
BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 5.0
296
Page 303
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
MUNICIPAL STREET AID FUND
CASH RECEIPTS
$ DIFFERENCE % CHG
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS FY18 VS
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET FY17 VS
BEGINNING BALANCE 135 100 100 100 - 0.0%
STATE GRANT 673,128 673,100 673,100 673,100 - 0.0%
INTEREST EARNED 214 - - - - 0.0%
TOTALS 673,477 673,200 673,200 673,200 - 0.0%
BUDGET SUMMARY
$ DIFFERENCE % CHG
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS FY18 VS
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET FY17 VS
TRANSFER TO GENERAL FUND 673,377 673,100 673,100 673,100 - 0.0%
CURRENT YEAR BALANCE 100 100 100 100 - 0.0%
TOTALS 673,477 673,200 673,200 673,200 - 0.0%
298
Page 304
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
REALTY TRANSFER TAX
CASH RECEIPTS
$ DIFFERENCE % CHG
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS FY18 VS
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET FY17 VS
BEGINNING BALANCE 9 - - - - 0.0%
REALTY TRANSFER TAXES 2,191,915 1,672,700 1,457,000 1,209,300 (463,400) 0.0%
INTEREST EARNED 437 - - - - 0.0%
TOTALS 2,192,361 1,672,700 1,457,000 1,209,300 (463,400) 0.0%
BUDGET SUMMARY
$ DIFFERENCE % CHG
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS FY18 VS
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET FY17 VS
PROGRAM EXPENDITURES 2,550 - - - - 0.0%
TRANSFER TO GENERAL FUND 2,188,634 1,672,700 1,457,000 1,209,300 (463,400) 0.0%
CURRENT YEAR BALANCE 1,177 - - - - 0.0%
TOTALS 2,192,361 1,672,700 1,457,000 1,209,300 (463,400) 0.0%
299
Page 305
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WORKER'S COMPENSATION FUND 662
OPERATING REVENUES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
BEGINNING BALANCE 1,248,164 1,256,300 1,251,900 1,487,800 231,500 18.4%
INTEREST INCOME 23,653 25,000 25,000 22,500 (2,500) -10.0%
PREMIUM FROM CITY 679,064 855,400 855,400 904,300 48,900 5.7%
MISCELLANEOUS REVENUE 9,489 - - - - 0.0%
TOTALS 1,960,370 2,136,700 2,132,300 2,414,600 277,900 13.0%
OPERATING EXPENSES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
PROGRAM EXPENSE - CLAIMS 561,086 475,000 475,000 565,000 90,000 18.9%
INSURANCE 105,416 105,500 105,500 110,800 5,300 5.0%
STATE OF DEL - SELF INSURANCE TAX 38,041 39,000 39,000 39,000 - 0.0%
CONTRACTUAL SERVICES 4,000 25,000 25,000 25,000 - 0.0%
TOTAL EXPENSES 708,543 644,500 644,500 739,800 - 14.8%
CURRENT YEAR BALANCE 1,251,827 1,492,200 1,487,800 1,674,800 182,600 12.2%
TOTALS 1,960,370 2,136,700 2,132,300 2,414,600 277,900 13.0%
300
Page 306
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
COMMUNITY TRANSPORTATION IMPROVEMENT FUND
OPERATING REVENUES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
PRIOR YEAR BALANCE 57,798 92,100 90,700 85,200 (6,900) -7.5%
GRANTS REVENUE 577,284 500,000 500,000 500,000 - 0.0%
INTEREST INCOME 145 - - - - 0.0%
TOTALS 635,227 592,100 590,700 585,200 (6,900) -1.2%
OPERATING EXPENSES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
PROGRAM EXP. GRANT RELATED 544,528 500,000 505,500 500,000 - 0.0%
CURRENT YEAR BALANCE 90,699 92,100 85,200 85,200 (6,900) -7.5%
TOTALS 635,227 592,100 590,700 585,200 (6,900) -1.2%
301
Page 307
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
LIBRARY GRANT
OPERATING REVENUES
$ DIFFERENCE
2015/2016 ORIGINAL ORIGINAL 2017/18 FY18 VS $
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
PRIOR YEAR BALANCE 30,571 17,300 37,600 - (17,300) -100.0%
STATE GRANT 293,835 305,500 297,100 281,700 (23,800) -7.8%
FEDERAL GRANT 2,500 2,500 2,500 2,500 - 0.0%
TOTALS 326,906 325,300 337,200 284,200 (41,100) -12.6%
OPERATING EXPENSES
$ DIFFERENCE
2015/2016 ORIGINAL ORIGINAL 2017/18 FY18 VS $
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
STATE GRANTS
FURNITURE/FIXTURES 9,827 10,500 12,500 1,500 (9,000) -85.7%
OFFICE SUPPLIES 24,413 30,800 30,800 30,000 (800) -2.6%
PRINTING AND DUPLICATING 12,306 12,500 14,000 13,000 500 4.0%
PROGRAM EXPENSES/SUPPLIES 25,436 27,500 30,000 23,500 (4,000) -14.5%
BOOKS 129,687 150,600 150,300 126,400 (24,200) -16.1%
COMPUTER SOFTWARE - - 1,000 2,100 2,100 0.0%
COMPUTER HARDWARE - - 4,400 1,000 1,000 0.0%
AUDIO VISUAL SUPPLIES 74,703 77,200 77,200 74,700 (2,500) -3.2%
POSTAGE 43 100 200 100 - 0.0%
TRAINING/CONF/FOOD/TRAV 3,303 5,300 6,000 2,500 (2,800) -52.8%
CONTRACTUAL SERVICES - - - - - 0.0%
OFF EQP/REPAIRS & MAINT 5,314 6,300 6,300 4,900 (1,400) -22.2%
OTHER EQUIP - PURCHASE - - - - - 0.0%
OTHER EQUIP - LEASE 1,849 2,000 2,000 2,000 - 0.0%
SUBTOTAL EXPENSES STATE GRANTS 286,881 322,800 334,700 281,700 (41,100) -12.7%
FEDERAL GRANTS
PROGRAM EXPENSES/SUPPLIES 2,500 2,500 2,500 2,500 - 0.0%
SUBTOTAL EXPENSES FEDERAL GRANT 2,500 2,500 2,500 2,500 - 0.0%
GRAND TOTAL EXPENSES 289,381 325,300 337,200 284,200 (41,100) -12.6%
CURRENT YEAR BALANCE 37,525 - - - - 0.0%
TOTALS 326,906 325,300 337,200 284,200 (41,100) -12.6%
302
Page 308
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
POLICE GRANTS
OPERATING REVENUES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
PRIOR YEAR BALANCE 154,944 295,300 513,000 72,400 (222,900) -75.5%
GRANTS RECEIVED 956,712 319,000 519,200 358,000 39,000 12.2%
INTEREST INCOME 2,022 - - - - 0.0%
TOTALS 1,113,678 614,300 1,032,200 430,400 (183,900) -29.9%
OPERATING EXPENSES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
EXPENDITURES
PERSONNEL EXPENDITURES
CADET PROGRAM SALARIES 67,850 71,400 - 11,900 (59,500) -83.3%
CADET PROGRAM FICA 5,191 5,400 5,500 900 (4,500) -83.3%
CADET PROGRAM W/COMP 3,382 4,200 4,200 700 (3,500) -83.3%
MATERIALS AND SUPPLIES
POLICE EQUIPT & PROG SUPP 177,889 284,000 591,000 312,000 28,000 9.9%
TECHNOLOGY EQUIPMENT 2,825 - - - - 0.0%
ADMINISTRATIVE EXPENDITURES
CELL PHONE CHARGES 19,690 16,000 16,000 20,000 4,000 25.0%
TRAINING 74,203 17,000 58,100 15,000 (2,000) -11.8%
AUDIT FEES - 1,000 - 1,000 - 0.0%
CONTRACTUAL SERVICES 90,714 5,000 11,000 - (5,000) -100.0%
TOTAL EXPENDITURES 441,744 404,000 685,800 361,500 (42,500) -10.5%
OTHER FINANCING USES
OPERATING TRANSFERS-OUT 159,017 82,000 274,000 60,000 (22,000) -26.8%
TOTAL FINANCING USES 159,017 82,000 274,000 60,000 (22,000) -26.8%
CURRENT YEAR BALANCE 512,917 128,300 72,400 8,900 (119,400) -93.1%
TOTALS 1,113,678 614,300 1,032,200 430,400 (183,900) -29.9%
THE ABOVE BUDGET INCLUDES THE POLICE GRANTS FUND, USDOJ
BYRNE GRANTS FUND AS WELL AS THE OTHER FEDERAL POLICE
GRANTS FUND.
303
Page 309
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC RED LIGHT PROGRAM
CASH RECEIPTS
$ DIFFERENCE % CHG
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS FY18 VS
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET FY17 VS
BEGINNING BALANCE 100 100 100 100 - 0.0%
POLICE FINES 468,793 496,900 496,900 511,800 14,900 0.0%
TOTALS 468,893 497,000 497,000 511,900 14,900 0.0%
BUDGET SUMMARY
$ DIFFERENCE % CHG
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS FY18 VS
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET FY17 VS
TRANSFER TO GENERAL FUND 468,793 496,900 496,900 511,800 14,900 0.0%
CURRENT YEAR BALANCE 100 100 100 100 - 0.0%
TOTALS 468,893 497,000 497,000 511,900 14,900 0.0%
304
Page 310
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
OPERATING REVENUES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
PRIOR YEAR BALANCE CDBG 2,013 2,100 2,100 2,100 - 0.0%
PRIOR YEAR BALANCE NSP 85,277 - - - - 0.0%
CDBG GRANTS RECEIVED 231,161 236,500 279,700 216,700 (19,800) -8.4%
REVENUE FROM NSP 25,501 - - - - 0.0%
TOTALS 343,952 238,600 281,800 218,800 (19,800) -8.3%
OPERATING EXPENSES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
Prior year Closing cost/down payment program 892 - 900 - - 0.0%
Prior year Ncall Research Inc. - - 1,000 - - 0.0%
Prior year Connection Supp Program - - 2,500 - - 0.0%
Prior year MHDC emergency home repair - - 22,300 - - 0.0%
Prior year Habitat for Humanity 5,500 - 3,000 - - 0.0%
Prior year Milford housing H/O rehab - - 13,400 - - 0.0%
Current year closing cost/down payment program 59,108 50,000 50,000 60,000 10,000 20.0%
Current year Connection Comm Supp program 4,952 7,200 7,300 3,000 (4,200) -58.3%
Current year Dover interfaith ministry 27,000 22,000 22,000 24,000 2,000 9.1%
Current year MHDC emergency home repair 12,990 25,000 25,000 25,000 - 0.0%
Current year Habitat for Humanity 37,047 30,000 30,000 21,300 (8,700) -29.0%
Current year MHDC homeowner rehab. 39,506 55,000 55,000 40,000 (15,000) -27.3%
Current year Peoples Place 6,722 - - - - 0.0%
Current year admin expense 37,444 47,300 47,300 43,400 (3,900) -8.2%
NSP program expenditures 95,453 - - - - 0.0%
CURRENT YEAR BALANCE CDBG 2,013 2,100 2,100 2,100 - 0.0%
CURRENT YEAR BALANCE NSP 15,325 - - - - 0.0%
TOTALS 343,952 238,600 281,800 218,800 (19,800) -8.3%
305
Page 311
FY 2017 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
SUBSTANCE ABUSE PREVENTION PROGRAM
OPERATING REVENUES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
PRIOR YEAR BALANCE 98,181 60,300 99,500 45,300 (15,000) -24.9%
GRANTS REVENUE 28,030 28,000 28,000 28,000 - 0.0%
RECREATION REVENUE 65,145 33,000 33,000 33,000 - 0.0%
TOTALS 191,356 121,300 160,500 106,300 (15,000) -12.4%
OPERATING EXPENSES
$ DIFFERENCE
2015/2016 ORIGINAL 2016/17 2017/18 FY18 VS %
ACTUAL BUDGET PROJECTED APPROVED FY17 BUDGET CHANGE
TEMPORARY HELP/BENEFITS 57,228 60,200 60,200 67,700 7,500 12.5%
PROGRAM EXPENSES/SUPPLIES 34,675 55,000 55,000 35,000 (20,000) -36.4%
CURRENT YEAR BALANCE 99,453 6,100 45,300 3,600 (2,500) -41.0%
TOTALS 191,356 121,300 160,500 106,300 (15,000) -12.4%
306