This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
Page 1
COUNCIL COMMITTEE OF THE WHOLE
The Council Committee of the Whole met on September 12, 2017 at 6:01 p.m., with Council
President Slavin presiding (departed at 7:12 p.m. and returned at 7:15 p.m.). Members of Council
present were Mr. Anderson, Mr. Sudler, Mr. Neil, Mr. Lewis, Mr. Cole, Mr. Polce (departed at
6:15 p.m. and returned at 6:16 p.m.; departed at 7:12 p.m. and returned at 7:14 p.m.), Mr. Hare, and
Mr. Lindell (arrived at 6:07 p.m.; departed at 7:08 p.m. and returned at 7:12 p.m.).
Mayor Christiansen was also present (departed at 7:28 p.m.). Civilian members present for their
Committee meetings were Mr. Shevock and Dr. Stewart (Legislative, Finance, and Administration),
and Mr. Caldwell and Dr. Warfield (Parks, Recreation, and Community Enhancement).
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee met with Chairman Hare presiding.
AGENDA ADDITIONS/DELETIONS
Mr. Lewis moved for approval of the agenda, seconded by Mr. Neil and unanimously carried.
Evaluation of Requests for Proposals (RFP) - Enterprise Resources Planning (ERP)
Mr. Kirby Hudson, Assistant City Manager, reminded members that the Finance Department had
solicited proposals (RFP # 16-039FN) for consulting services to assist the City with an Enterprise
Resource Planning (ERP) project. The City selected Berry Dunn McNeil & Parker, LLC
(BerryDunn) as the consultant to successfully guide the City through the initial project of Phase I
which included the ERP needs assessment, software development, vendor selection for Phase II
consultant, and contract negotiations with the ERP vendor selected.
Mr. Hudson advised that proposals were solicited for an ERP solution that would best meet the City's
requirements in March 2017, and two (2) entities responded to the Request for Proposal - ERP
System Selection Project: Edmunds and Associates, and Tyler Technologies. He stated that, after
staff's due diligence and with the technical assistance of BerryDunn, it was staff’s recommendation
that the Cities enter into an Enterprise Resource Planning Technology Implementation Contract with
Tyler Technologies. Mr. Hudson noted that the Tyler proposal provided the best in class
functionality and would provide the City with a long-term solution.
Mr. Hudson informed members that City staff selected the City-Hosted Deployment as the ERP
solution at an estimated one-time cost of $2,193,832 and an annual maintenance cost of $200,220.
He explained that maintenance cost will start upon the installation of each module as the City works
through the three-year project schedule. Mr. Hudson stated that the City has requested to price in
the E-Notify services (annual cost $24,200) for customer alerts/notifications and the ECitation for
Police Code enforcement operations. He advised that these items are being included in the final
contract negotiations, so the final pricing will vary but will remain within budget.
Mr. Hudson stated that staff was also requesting authorization to retain the services of BerryDunn
to assist with the implementation phase of this project. He advised that their proposal for that service
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 2
was $186,665, which was within $5,000 of two (2) proposals submitted in the original consulting
RFP.
Staff recommended authorization for the Acting City Manager to enter into a contract with Tyler
Technologies for the purpose of acquiring an Enterprise Resource Planning system and authorization
to retain the services of BerryDunn to assist staff with the implementation phase of this project.
Total cost not to exceed the authorized budget unless otherwise approved by City Council.
Responding to Mr. Sudler, Mr. Hudson explained that if the E-Notify module is obtained, Customer
Service staff would ask new customers and existing customers who come in to pay their bills for cell
phone and email information, which would be needed to contact customers by text and email. He
indicated that staff would explain why they were asking for the information, stating his belief that
customers would want to provide their information because this service would benefit them.
Mr. Hudson noted that ECitation relates to law enforcement and is a separate module.
In response to Mr. Anderson, Mr. Hudson advised that staff did not personally test these solutions.
He explained that BerryDunn gave Edmunds and Associates and Tyler Technologies each two-and-a-
half days to go through all of their modules, and a number of department heads and staff attended
these presentations. Mr. Hudson indicated that staff was able to explain how the current systems
work, ask if the companies’ modules could perform those functions, and ask questions. He stated
that staff was able to get their individual needs addressed and pinpoint some of the things that the
City would like to see for particular departments. Mr. Hudson noted that each department looked
at modules from their own standpoint, and staff overwhelmingly stated that they liked the Tyler
Technologies proposal much better than Edmunds and Associates.
Mr. Anderson asked how system information would be backed up. Responding, Mr. Hudson
explained that staff recommended the City-Hosted Deployment, so everything would be located
on-site.
In response to Mr. Anderson, Mr. Hudson stated that the annual cost would be lower with the new
system, if approved, and that the City still had to enter into the negotiation phase. He noted that
BerryDunn negotiates with governments, school systems, and colleges and, as a consultant,
BerryDunn had worked with Tyler and many other entities. Mr. Hudson stated that staff believed
that, coupled with BerryDunn, they should be able to get the price down.
Responding to Mr. Anderson, Mrs. Donna Mitchell, Acting City Manager, stated that the Town of
Georgetown uses the full Tyler Technologies suite, and the City of Newark uses the general
ledger (GL) side but not the utility billing. She noted that the City of Newark had another firm doing
their utility billing but then had to integrate and experienced a lot of difficulties, and the City of
Dover’s staff did not want to go down that path. Mrs. Mitchell advised that staff wanted to have
one (1) company so that everything would be fully integrated. (City Clerk’s Office Note: Subsequent
to the meeting, Mr. Hudson clarified that it was Sussex County, rather than the Town of Georgetown
that uses the full Tyler Technology Suite.)
Page 3
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 3
Mr. Neil noted the large difference of $2M versus $531,000 in price and asked why staff felt the
Tyler software was so superior to Edmunds. Responding, Mr. Hudson stated that this could be
described as driving a Mercedes Benz and then getting into a Yugo. He advised that every
department head and staff member involved believed that the Tyler system was easier to understand,
view screens, and work with for their particular module.
Mrs. Mitchell advised that Tyler has much more functionality than Edmunds and, while Edmunds
would get the City partway into the 21st century, Edmunds would bring it all the way there. She
explained that the Tyler system covers every office that the City has, and the ECitation module for
police fines could be integrated as a separate PC system. Mrs. Mitchell stated that the Tyler system
covered the whole gamut of everything staff could imagine would be needed for the City’s system,
including every type of billing, inspections, planning, and code. She indicated that Edmunds was
not able to do everything to get the City where it needed to be for the long term, and this was the
driving force for staff’s recommendation to select Tyler Technologies.
In response to Mr. Lewis, Mr. Hudson indicated that if the proposed system was implemented, staff
intended to go forward with the project, rather than doing a trial run, because staff had the
opportunity for approximately the last six (6) months to review and test it. He noted that staff had
not necessarily been at terminals using the system but they had watched Tyler perform things that
were closely related to what staff does on a daily basis.
Mr. Lewis asked how much advance notice customers would be given regarding their billing cycle
if the system were approved. Responding, Mr. Hudson advised that staff could tailor the notice,
explaining that a robo-call could be issued with a drop-dead date, or alerts could be issued some time
before implementation. Mr. Lewis asked if this would be optional for customers. Responding,
Mr. Hudson stated that staff would let customers know that the City has a feature that is going to
benefit them; however, staff could not make someone provide their information if they do not want
to. He indicated that he was unsure why customers would not want to have a reminder that would
eliminate the typical excuses that staff frequently hears from customers regarding not paying their
bills because they forgot or were away on vacation.
Ms. Slavin stated that he had a little experience with such implementations. He advised software
typically comes with standard functionality, and requirements are then mapped into the standard
functionality. Mr. Slavin explained that a gap exists, and there is an option to modify the system and
have it meet everything that the agency currently does or modify business practices so that they meet
the system. He indicated that there is typically an 80/20 rule, whereby 80% is the out-of-the box
system and there is a 20% gap between the requirements and the system. Mr. Slavin asked if staff
had looked at the gap analysis between the City’s requirements and the capability of the software in
general terms. Responding, Mr. Hudson stated that the whole idea behind having department heads
and staff attend sessions was to come up with ideas, and this was discussed repeatedly. He stated
that BerryDunn would also allow staff to submit questions at a later date if things came up at the last
minute. Mr. Slavin cautioned that there would be an additional one-time cost for each modification
made to the system and, although some of the cost may be included in the customization,
modifications may increase the out-year maintenance cost. He advised that the City would be forced
into upgrades on the software and would have to upgrade modifications each time as well.
Page 4
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 4
Mr. Slavin stated his assumption that the City would not run ADP and the new system as parallel
systems but would have a cut-over date. He stated his belief that what Mr. Lewis had been hinting
at was the fact that there would probably be a fairly rigorous acceptance testing to ensure that things
are being done correctly, people are being paid the right amount, and bills are being issued for the
right amount. Mr. Slavin asked what dates were driving the decision for the cut-over, noting that
sometimes it is a fiscal year and sometimes a pay cycle. Responding, Mr. Hudson stated that one (1)
of the reasons that BerryDunn was being asked to be the City’s consultant and to assist staff with the
implementation phase was that they have a lot more experience. Mr. Slavin advised that, although
staff may think that the system can be turned on and go live as soon as they get through testing, they
would find that they will only have four (4) available dates for any year when this can be done so that
everything syncs up.
Mr. Sudler asked if staff had compared success rates for neighboring cities in regard to this system.
Responding, Mr. Hudson stated that he had a list of municipalities throughout the country which
were very close to Dover in size, with some a little larger; however, none of them were in Delaware.
He explained that staff used a scoring method to compare the companies that presented, noting that
BerryDunn helped with this process. Mr. Hudson stated that both systems were scored twice and
the results were clearly on the side of Tyler, rather than Edmunds and Associates.
Responding to Mr. Sudler, Mr. Hudson stated that, as a whole, staff did not come across any
negatives for the Tyler system. He noted that Edmunds was not able to provide some things that
staff would have liked to have seen but they indicated that they may be looking to do them in the
future.
Mr. Sudler stated his belief that, if the system were implemented, retaining contact information
would have to be mandatory for total success. He advised that it would be a good idea to make it
mandatory for customers to provide contact information when they sign up to let them know that
their bill may or may not be late. Mr. Hudson advised that staff would be asking all new customers
for their contact information and it would not be optional. He indicated that the option would be for
existing customers from whom staff would have to ask for additional information.
In response to Mr. Shevock, Mr. Hudson stated that the City’s current hardware would not be
capable of running the functionality of the new system and new hardware equipment would be
needed, in addition to the software.
Mr. Shevock noted that a little more than $2M was budgeted for the current year and asked if the
other funds would be budgeted next year to cover everything. Responding, Mr. Hudson stated that
the figures that the Committee was reviewing would apply to the implementation of the system. He
reminded members that the two (2) additional modules that were added in for Customer Service and
the Police Department would be negotiated. Mr. Hudson stated that staff felt that the current price
was a sticker price and could still be negotiated.
Mrs. Mitchell reminded members that this project started in September of 2016 when vendors were
brought in with demos, and they showed staff what new systems would look like and piqued their
interest. She explained that staff set up a process and an RFP was completed to select a vendor to
Page 5
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 5
help staff select an ERP system. Mrs. Mitchell stated that she had sent a milestone chart to Council
a couple of times letting them know where staff was on the project. She noted that staff had been
following the project plan all along and the ERP had been in the Capital Improvement Plan (CIP)
for the last two (2) years. Mrs. Mitchell advised that the total funds for this project had been
included in the CIP over three (3) years and noted that the timing for paying the fees may be
different. She stated that the process took into account the demos that Mr. Hudson had discussed,
and staff went through scoring sheets. Mrs. Mitchell estimated that BerryDunn had been to Dover
probably three (3) times having seminars with staff, writing seminars, scoring the products, and
doing a needs assessment. Mrs. Mitchell explained that staff went through a very long needs
assessment and all departments had to fill out forms regarding their needs to make sure that the
system would meet the needs.
Mrs. Mitchell explained that staff was being told that the system would not be a customizable
solution but a standard package, and the City would need to change its processes to meet the system.
She advised that staff was not looking to do a lot of modifications and customizations because they
would be outside of the regular license and maintenance fees. Mrs. Mitchell stated, in regard to
customer files, that staff had been told that they could cross modules for taxes, utilities, permits,
clean hands, etc., that staff deals with every day. She indicated that when a customer is brought up,
everything for that person would be provided, noting that currently the information for each module
type was in a silo and the customer’s name was entered differently.
Mrs. Mitchell stated that staff met last week and planned to start with the GL, and other functions
would be phased in. She advised that the utility billing would be at the end of the three-year time
frame. Mrs. Mitchell stated that they met with the tax office, permitting and inspections, and utility
billing and told them of the need to get their files matched up. She explained that staff had been told
that this could be done before or after the fact, and she did not want to do it after the fact because it
would not get done, and she wanted the system to work the way it is supposed to work.
Mrs. Mitchell advised members that staff would be starting with the tax system because it is the main
system that includes lot numbers and tax information. She stated that she had her monthly
meeting with Mrs. Cheryl Bundek, Tax Assessor, earlier in the day, and Mrs. Bundek and
Ms. Patricia Marney, Customer Service Director, had already developed a checklist of all the
information that staff has to take from each customer and input, to ensure that the same information
is available to everyone who needs to access it. She indicated that staff was already being trained
that the City has to change the way it does business.
Mrs. Mitchell stated that this would be a really big project, the consultants had advised that it would
take approximately 30% of the time of the key people involved, and staff was being told that they
must gear up for it. She expressed her hope that interns could be brought in to help with routine
tasks if there were funds left over; however, she did not know if there would be enough funds to do
this. Mrs. Mitchell explained that funds were getting close because she was asking to add ECitation
to make things easier on the police. She advised that staff was trying to manage to the budget and
make sure that everyone is educated on how the project would work and what the expectations are.
Page 6
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 6
Mrs. Mitchell stated that, after reviewing the scope of work from Tyler, she was thinking about
relocating a staff member to the former office space of Mr. William Neaton, with the sole
responsibility of making sure that everybody stays on track. She noted that she had not yet talked
to this staff member. Mrs. Mitchell advised that staying on track would affect the City’s pricing, and
she stated her belief that an allowance of approximately 250 hours of leeway would be given and the
City would have to pay more for anything over that. She stated that staff understood that this project
was a big step for the City; however, the City has had the current system for 20 years and there was
a need to move into the future.
Mr. Anderson asked if Edmunds would require the City to use ADP. Responding, Mrs. Mitchell
explained that Edmunds has a payroll system but not time and attendance. Mr. Anderson noted that
this was another flaw with Edmunds. Mrs. Mitchell advised that staff was trying to keep everything
moving into a fully integrated system so there would not be silos, like the City currently has. She
stated that staff was trying to get all the pieces communicating and working together.
Dr. Stewart noted that City-Hosted Deployment would be cheaper than Vendor-Hosted and asked
if the City has the staff and technical background to actually manage the system once the vendor
wraps it up and walks away. Mrs. Mitchell responded yes, stating that the City has an IT
programmer for its HTE system who is on an IBM AS400 and is somewhat familiar with SQL. She
indicated that staff chose City-Hosted Deployment, and the additional hardware cost of
approximately $62,000 was included in the $2,444,000 in the recap of the budget. Mrs. Mitchell
noted that the system would take an SQL programmer, and the $2,444,000 included $70,000 for an
SQL programmer consultant to help with the project and to train the City’s current programmer how
to do the job in the future. She noted that she had received the RFP for the consultant earlier in the
day. Mrs. Mitchell stated that, rather than telling the current employee that they are not qualified for
the job anymore, the City will get the employee qualified for the job by having the consultant train
them at the same time they are helping with the project.
Mr. Neil moved to recommend approval of staff’s recommendation to authorize the Acting
City Manager to enter into a contract with Tyler Technologies for the purpose of acquiring
an Enterprise Resource Planning system and authorization to retain the services of BerryDunn
to assist staff with the implementation phase of this project. Total cost not to exceed the
authorized budget unless otherwise approved by City Council. The motion was seconded by
Mr. Anderson and unanimously carried.
Proposed City of Dover Ethics Initiative
Mr. Polce stated that, in order for Councilmembers, Council-appointments, Mayoral-appointments
and the Mayor to better serve the constituents of the City of Dover in an open, transparent fashion
and to further be held accountable for any conflicts of interest, the proposed Ethics and Financial
Disclosure Initiative was brought forward for consideration. He reviewed the Initiative as follows:
Page 7
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 7
The following actions shall be taken by each of the designated persons:
1. Councilmembers shall file financial disclosures annually with the Public Integrity
Commission. Councilmembers shall submit proper and necessary documentation
by August 1st of each calendar year.
2. Committee and Commission appointees shall sign an acknowledgment decree of
the ethics policies of the City of Dover. The document shall be read, reviewed,
and signed by all appointees by the time of their appointment or re-appointment.
3. Councilmembers, Council-appointments, Mayoral-appointments, the Mayor and
all city employees shall undergo and receive annual training on the City of
Dover's ethics policies and procedures.
Mr. Polce noted that the City currently has an Ethics Commission that was put in place before his
time on Council. In regard to recommendation #1, he stated that Council members should be held
accountable by filing an annual financial disclosure form to the Public Integrity Commission (PIC)
that would clearly delineate Council members’ personal holdings and highlight any personal
conflicts of interest that could arise throughout normal business.
Mr. Polce moved to recommend that the recommendations be forwarded to full Council, seconded
by Mr. Lindell.
Mr. Anderson advised that he liked the idea of point #2 and thanked Mr. Polce for bringing the
subject up. Responding to Mr. Anderson, Mr. Polce stated that he was open to clarification
regarding point #3 and that the annual refresher training was something that could be done online
or by paper rather than holding a meeting for that purpose. Mr. Anderson indicated that he would
like to see this clarification put in the amendments.
Mr. Anderson asked why members would file disclosures with the PIC, noting that this is not
required in the City’s Charter and the City is governed under its own ethics. He indicated that he
was a bit skeptical of this recommendation, as someone who had been a longtime privacy advocate.
Mr. Anderson stated that this requirement would be enough to be intrusive but not enough to do any
good at the State level, and he did not see how that would change at the City level.
Mr. Polce expressed appreciation for Mr. Anderson’s support for points #2 and #3. He stated that,
in regard to point #1, he had filed a PIC disclosure form directly after he was elected, and he knew
that other current and past members of Council had filed as well. Mr. Polce noted that this is an easy
process, explaining that the form asks where your sources of income are coming in from and at what
amounts. He indicated that this document keeps you true to know where your financial interests lie.
Mr. Polce stated that this is a level of transparency for the general public and a way to hold members
and their constituency accountable for actions of potential impropriety.
Mr. Anderson asked if a conflict of interest was not governed already under the ethics code.
Responding, Mr. Polce stated that the major concern was that a conflict would not be disclosed,
Page 8
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 8
noting that currently the Ethics Commission does not require disclosure of financial holdings and
vested interests by Council. He noted that members could recuse themselves; however, this would
be based on a Council member’s personal actions. Mr. Polce advised that his recommendation
would: 1) streamline the process; 2) create equity among all Council members, specifically with
financial interests; and 3) open the doors for full and open transparency as much as possible.
Mr. Anderson asked if Mr. Polce had any particular reason for the suggestion, or statistical or other
background regarding this issue being a problem. In response, Mr. Polce advised that, nationally,
numerous municipalities around the same size as the City have financial disclosure documentation.
He indicated that Delaware's situation is unique in that it has a State-wide entity whose sole job is
to receive these documentations, reconcile them, and be the public watchguard of potential conflicts
of interest. Mr. Polce stated that he was pretty sure that not a single municipality or town had taken
this step in Delaware, based on his limited research in the State, and the City of Dover would be the
first. He advised that there is potential impropriety happening in some of the municipalities across
the State, noting that it is seen quite often in the newspaper that council members’ discretionary
funds, and their personal vested interest in those discretionary funds, raise questions and alarm. He
indicated that the recommendation would be a way to create an even playing field for all members
to be proactive, disclose their interests, and have transparency to their constituency, which hopefully
would allow members to perform better government.
Mr. Sudler stated that, in regard to point #1, he did not have a problem disclosing who he works for
and some of his interests, but did have a problem with disclosing how much money he makes. He
indicated that this was personal, noting that some things should remain personal and some public,
and he did not think disclosing how much he makes or does not make is the public’s view.
Mr. Sudler advised that the IRS can provide information if someone was really inquisitive as to his
finances or if this was an issue; however, he did not think this was necessary. He indicated that he
did believe it necessary to provide a member’s employer or what other jobs they may have for
conflict of interest. Mr. Sudler stated that he did not appreciate the kind of legislation that pries into
his personal income. He noted that members are public officials and open to scrutiny; however, they
also have a right to privacy.
Mr. Slavin stated that Mr. Sudler had offered a valid concern and, for clarification, Mr. Slavin
explained that the PIC filing does not ask for level of income but asks where the individual is
receiving income from over a certain amount and who the individual is in debt to over a certain
amount so that they know what entanglements the individual may have.
Responding to Mr. Hare, Mr. Polce explained that individuals are asked if they have any holdings
above a certain amount. Mr. Hare asked if individuals are asked about property or business
ownership, for example, if someone was a 90% equity owner of a company. Responding, Mr. Slavin
stated that a business ownership level over a certain amount would be disclosed; however, he did
not believe that individuals are asked for disclosure on real property. Mr. Polce advised that if
members owned several homes held in an LLC, they would have to report that information because
it is a business entity; however, they would not have to report their personal domicile.
Page 9
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 9
Mr. Hare asked if an individual would have to disclose that they own property that they are trying
get the City to do something with, that the City may not want to do, for example annexation.
Responding, Mr. Polce stated that this would technically not have to be disclosed.
Mayor Christiansen stated that he appreciated Mr. Polce bringing this forward since
Mayor Christiansen was one of the people who originally brought the City’s Ethics Commission to
fruition. He indicated that he agreed with some of Mr. Sudler’s points; however, when there is
mischief outside of the City, it is reassuring that Council is addressing these issues.
Mayor Christiansen advised that he would be supportive. He indicated that he also agreed with
Mr. Anderson, noting that committee members and Council appointees are all on tight schedules and
have other lives; therefore, an online option or paper copy should be available. Mayor Christiansen
advised that he thought it really important that the public have trust that the members of Council, the
Mayor, and City staff are above reproach, and the City owes this to the public. He stated that he
appreciated the Legislative, Finance, and Administration Committee and members of Council for
being candid in their discussions.
Mr. Slavin stated that he believed very strongly in this proposal and appreciated that it was being
brought forward. He advised that this would correct a deficiency that the City has, stating that
members receive little to no real guidance on ethics on a one-time or annual basis, through no fault
of their own, simply because they do not pay attention to it. Mr. Slavin indicated that members know
what is in the ordinance and Code; however, they have other responsibilities as well, and leaving
ethics to a case-by-case basis makes for difficulty sometimes. He stated that the recommendation
would allow members to be very proactive and would align them with a practice that is already in
place for hundreds of public officials of the State, and this is a standard that he thought members
should shoot for. Mr. Slavin advised that this would correct a deficiency, which he stated was not
meant as a slight to the members of the City’s Ethics Commission. He stated that he thought that
members of the Ethics Commission would perhaps agree with the statement that when they are
nominated by the Mayor and confirmed by Council, they are then in a delicate position when a
member of Council has to come before them. Mr. Slavin explained that the recommendation would
take the elected officials out of the Ethics Commission’s purview but would leave everyone else, so
the Commission would be dealing with appointees and staff.
Mr. Slavin stated, in regard to Mr. Anderson’s concern, that PIC filings, which Mr. Slavin had been
filing for over 20 years as a public official in Delaware, are eligible under the Freedom of
Information Act (FOIA), but they are not published. He noted that when an individual hits the send
button, the filing does not go to a website that lets everyone see it.
Mr. Sudler asked, in regard to point #3, if PIC would step in and be the deciding factor for an ethics
complaint or issue regarding the Mayor or Council. Responding, Mr. Polce stated that this would
apply to the entirety of his recommendations and not specifically to item #3.
Mr. Polce withdrew the motion to recommend that the recommendations be forwarded to full
Council, in order to accept amendments to the proposed Ethics and Financial Disclosure Initiative
document.
Page 10
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 10
Mr. Sudler stated that he would like to work with Mr. Polce regarding council members and mayor
concerns going to the PIC rather than the Ethics Commission. He indicated that he thought this was
a great idea.
Mr. Polce stated that he appreciated Mr. Sudler’s comment and was committed to adopting feedback
from this conversation to ensure members get it right. He indicated that it was a pivotal point that
probably lacked clarity within the document that PIC would be the proper channel for recourse for
all three (3) points. Mr. Sudler thanked Mr. Polce for his hard work and answering his questions.
Mr. Lewis thanked Mr. Polce for bringing this issue forward, noting that he was a big proponent of
transparency. He asked where the training would come from and whether an attorney from PIC
would be called in to give members a course. Responding, Mr. Polce indicated that he was
committed to making sure that, moving forward to Council, there is clarification in the document.
He advised that his commitment was to making sure that the modality is best fitted for the individual,
so online training or a written test, as suggested by Mayor Christiansen, would be completely
acceptable. Mr. Polce advised that numerous initiatives across the nation have several forms of
ethics training, which is most often offered in an online platform that takes a few hours to complete
and certification is given. He noted that the State currently requires annual ethics training.
Mr. Lewis asked how technical members would get and if they would reveal 401(k)s and pensions.
In response, Mr. Polce advised that, anecdotally, the PIC form is very easy to submit. He noted that
it asks where the individual’s income is coming from and if they have any vested interests in
stocks/bonds, over a certain threshold. Mr. Polce stated that it did not ask how an individual is
vested, such as if the majority share of a rolling Roth is in real estate or not, but does ask very direct,
simple questions about financial interests, records them, and holds the individual accountable.
Mr. Slavin stated, for clarification, that if holdings were in a mutual or retirement fund, the
individual is only required to name the fund. For example, he advised that the State has a Voya
retirement fund, and if you are in that, you just state Voya retirement.
Mr. Anderson stated that he would like to get working toward an amendment so that members could
move this forward, as he thought it was worthwhile. He asked how members wanted to word the
amendments, for instance an amendment regarding the annual training and another regarding the
PIC. Responding, Mr. Hare suggested that members let Mr. Polce take the proposal back, tweak it,
and bring it back at the next Committee meeting, and Mr. Anderson and Mr. Polce agreed. Mr.Polce
thanked his colleagues for their feedback, and promised to incorporate the Committee’s
recommendations and revisit the subject at the next Legislative, Finance, and Administration
Committee meeting.
Mr. Hare stated that this item would be placed on the agenda for the next Legislative, Finance, and
Administration Committee meeting and Mr. Polce would have the changes made.
Updated Memorandum of Understanding (MOU) for Preliminary Land Use Services (PLUS)
Review
Mr. David Hugg, Acting Director of Planning and Community Development, informed members
that, in 2004, the State adopted the Preliminary Land Use Service (PLUS), which is a process at the
Page 11
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 11
State level where large projects that have the potential to have impacts beyond the local jurisdiction
or of a somewhat regional nature go through a review and comment period separate from local
government. He explained that the law that enacted PLUS requires that those projects be submitted
by a local government to the PLUS process.
Mr. Hugg informed members that, in 2004, the City adopted a Memorandum of Understanding
(MOU) with the Office of State Planning Coordination (OSPC) that sets thresholds and provides
baselines for how the process will work. He indicated that since 2004, approximately 6% of all of
the land use change/land development applications filed with the City had raised to the level where
a PLUS review was needed. Mr. Hugg explained that examples of projects requiring PLUS review
were a residential development of more than 125 houses and a commercial or industrial project of
more than 75,000 square feet.
Mr. Hugg advised that the City has a certified and adopted Comprehensive Plan from 2009, which
is one (1) of the requirements for allowing a jurisdiction to exempt itself from PLUS. Additionally,
he advised that the City has its own review process in the Development Advisory Committee,
explaining that if a City has a review process that is equal to or more stringent than the State, it can
seek a waiver. Mr. Hugg noted that the provisions of the PLUS process can be avoided for situations
such as a very incidental or minor rezoning that requires a de minimis Comprehensive Plan
amendment. He explained that the new MOU, developed by the City’s Planning Staff and OSPC
Staff, clarifies these understandings. Mr. Hugg reviewed the MOU, noting, in particular, that it
clarified that projects at Garrison Technical Park do not require PLUS review except in very limited
circumstances, raised the threshold limit on residential projects to 125 or more dwelling units, and
added in the minor projects waiver provisions. Mr. Hugg advised members that the City’s Planning
Commission reviewed the MOU at its Quarterly Workshop on August 23, 2017.
Mr. Neil moved to recommend approval of the Memorandum of Understanding (MOU) for
Preliminary Land Use Services (PLUS), as recommended by staff. The motion was seconded
by Mr. Sudler and unanimously carried.
Proposed Code Enforcement Policy and Vacant Building Ordinance Changes
Mr. David Hugg, Acting Director of Planning and Community Development, stated that, as a result
of increasing concerns about the time associated with resolution of code enforcement actions, the
difficulty in collecting on fines or alternatively causing buildings to be brought into compliance, and
the implications of the various exemptions to the vacant building ordinance (VBO), staff had
reviewed their authority and proposed changes to procedure and code provisions. He reviewed the
proposed changes to Code Enforcement Policy and the VBO, noting that this was the first part of a
two-part process that related to policy. Mr. Hugg stated that he had been given the advice that even
though he, as Acting Director, can impose policy as long as it is consistent with the underlying code,
which this policy was, it should come before the Legislative, Finance, and Administration
Committee to be discussed or endorsed. He noted that he had not included in the document that
there is a provision in the fee structure in the Dover Code that the City can double fines if corrective
action is not taken; therefore, an even greater penalty is available. Mr. Hugg advised that the second
piece of the policy would be a rewrite of the VBO to eliminate some of the waivers and loopholes,
which would probably come before members in October. He noted that it did not make any sense
Page 12
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 12
to him to exempt all the vacant storefronts downtown if they have somebody living upstairs above
them, stating that there was no disincentive for the property owner to make improvements.
Mr. Hugg indicated that he wanted to make members aware of these policy changes and ensure that
they did not have any major concerns.
Mr. Slavin thanked Mr. Hugg and his staff, as well as Mrs. Donna Mitchell, Acting City Manager;
Ms. Lori Peddicord, Acting Controller/Treasurer; Mr. Kirby Hudson, Assistant City Manager, and
everyone in City government, stating that this spirit of finding and fixing things was contagious. He
stated that the City had turned the corner and was now addressing all of these things that were
weighing it down. Mr. Slavin stated that this was a good example of seeing something that is wrong
with the ordinance, knowing how to fix it, and doing so. He thanked Mr. Hugg for bringing this
matter, and other things, forward.
Responding to Mr. Slavin regarding the particular fines he was discussing, Mr. Hugg advised that
fines would be primarily for property maintenance kinds of code violations. He indicated that there
is a fee structure associated with grass cutting, which is a separate category of violations. Mr. Hugg
explained that grass cutting has its own notice provisions and ability to follow up by having the grass
cut if needed. He explained that examples of these violations are cars parked on the grass, trash,
buildings with broken windows that do not rise to the level of being a dangerous building but clearly
are violations, or something that needs to be addressed.
Mr. Neil congratulated Mr. Hugg and the staff and everyone else who had worked on the policy. He
asked if the City or the violator would have to pay court and legal costs. Responding, Mr. Hugg
advised that if the City brings an action, part of that action can be a request for recovery of costs if
the City is successful. He stated that the thinking behind this was that the most critical thing is to
get the building and code violation issues corrected and not necessarily recovery of the money,
noting that Mrs. Mitchell might have a different thought. Mr. Hugg advised that, in his experience,
when a jurisdiction goes to court, very often the magistrate or Justice of the Peace will waive the
financial penalties, noting that they do not have a history in Delaware of being in favor of fining
people for code and planning violations, etc. Mr. Hugg stated that the City could say, "We're taking
Mr. Anderson to court because he refuses to fix his property and we want $500 plus our court costs,"
which would be nice; however, at the end of the day the owner would still have a building that has
not been fixed up. He indicated that if the City was going to cure some of the blight conditions that
it is dealing with, it was much more important to get the property addressed and risk that all of the
penalty money might not be paid. Mr. Neil stated that he would like to see it included in the
document that the City could do this so that the City would have another tool, and Mr. Hugg stated
that he would address this.
Mr. Anderson stated his belief that, in accordance with the ordinance, people are first notified. He
noted that the proposed change would associate the warning with a fine and questioned if it would
really be a warning if it comes with a fine. Responding, Mr. Hugg stated that this would be like the
fine he would probably receive if he ran a red light. He advised that the code officer has discretion
and, for example, if there was an issue with debris in the front yard of Mr. Anderson’s house, the
code officer could say, "Hey, how about picking this up? I don't really want to give you a citation."
Mr. Hugg stated that this would be the end of the discussion, a new case would not be opened, and
Page 13
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 13
nothing would really happen. He advised that part of the reason he wanted to reduce the penalty to
$25 was that the City was expending some cost in sending a person out and writing a citation, and
he did not want to just say, "Oh sorry, don't do it again." Mr. Hugg indicated that a little pain should
be associated with the violation, which was why it was structured this way.
Mr. Hare stated that a code enforcement officer had advised someone that they were not allowed to
park their car on the grass in their front yard and asked them to move it so they did not get a
violation. He stated that three (3) days later the employee came back, the car was parked in the
grass, and he issued a first violation. Mr. Hare stated the car was moved and had not been there
since. He commended the Mr. Phillip Lewis, Code Enforcement Officer, who had done a very good
job and was very nice. Mr. Hugg noted that the code enforcement staff has that discretion.
Responding to Mr. Lewis, Mr. Hugg stated that he did not know the percentage of fines that are
collected; however, most of the initial fines, such as $100 or $250, are collected but fines above that
level are not. He noted, in addition, that traditionally penalties for certain kinds of exterior property
management violations had not been added as a tax lien because staff was under the impression that
they could not do this. Mr. Hugg advised that, after reading the State law carefully with
Mr. William Pepper, Deputy City Solicitor, staff would be amending that procedure so a penalty for
a property maintenance issue, for a violation such as a sagging front porch, could be applied as a tax
lien. Mr. Lewis requested Mr. Hugg to email him with the percentage of fines that are collected.
He stated that he concurred with Mr. Hugg regarding liens being implemented on taxes and
commended him for integrating this.
Mr. Hare stated that he was unsure if any action was needed on this matter, stating his understanding
that it was Mr. Hugg’s option to make these changes and he was just presenting them to members
for discussion. Mr. Slavin stated that staff was informing members of this action but it was clearly
at staff’s level to do this.
Mr. Neil moved for adjournment of the Legislative, Finance, and Administration Committee
meeting. The motion was seconded by Mr. Shevock and unanimously carried.
Meeting adjourned at 7:12 p.m.
PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE
The Parks, Recreation, and Community Enhancement Committee met with Chairman Sudler
presiding.
AGENDA ADDITIONS/DELETIONS
Mr. Neil moved for approval of the agenda, seconded by Mr. Lindell and unanimously carried.
Page 14
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 14
Request for Dog Park and Passive Playground - Acorn Farms
Members reviewed a request from Ms. Mahala Duffy, 104 Teak Court, for consideration to build a
dog park and passive playground, as well as a petition requesting a dog park and playground for
Acorn Farms Park at 1 Acacia Place.
Mr. Sudler acknowledged that members had received correspondence from Ms. Mary E. Bradley,
dated September 11, 2017, expressing her strong opposition to the request for a dog park and passive
playground in Acorn Farms (Attachment #1).
Ms. Duffy advised that members of the community were present to advocate on behalf of the Acorn
Farms community.
Ms. Sandra Taylor, 36 Acacia Place, indicated that the Acorn Farms community had talked about
a dog park and a playground approximately ten years ago; however, it did not go forward because
they thought that they would be liable for any accidents. She noted that they had been told that it
would be at the person's discretion, and if they fell, it would not come on the homeowners; therefore,
they brought the matter up again and came up with the dog park and playground. Mr. Sudler asked
if Ms. Taylor was in support of a dog park or not, and she stated that she was in support.
Mr. Anderson expressed his thanks that this issue had been brought up, noting that there had been
a number of requests for dog parks around the City. He asked if the area was currently owned by the
City or would be ceded to the City. Responding, Ms. Duffy stated that the area was currently owned
by the City and this was why the request was brought to the City. She explained that she had created
a petition and drafted a letter regarding having a City park put into this zoned off area.
In response to Mr. Slavin, Ms. Taylor explained that the Acorn Farms Homeowners Association
(HOA) was the underlying property owner; however, during their HOA meeting in July, it was
brought to her attention that there was currently a City of Dover sign posted there. She indicated that
she did not know what was going on, stating that she thought it was common ground owned by the
Acorn Farms HOA. Mr. Slavin suggested that the City might be able to clarify who owns the
property.
Mr. Hare stated his understanding that they wanted to put a dog park there at their expense, and not
the City’s expense, if the land is HOA land. Responding, Ms. Duffy explained that the request was
brought for the City to incorporate a dog park. She stated that the area is zoned off to the City and
the HOA is no longer a part of owning the area. Mr. Hare asked if they would want to put in a dog
park if the City was to give the area back to the HOA. Responding, Ms. Duffy stated that this would
have to be discussed within the HOA.
Mr. Hare advised that he had driven through the area and there were quite a few yards with grass that
was approximately two (2) feet tall. He asked if the HOA monitors this and calls the City to come
and issue summonses. In response, Ms. Taylor advised that they do not monitor this because they
do not have the numbers to do so and there is no volunteerism. Mr. Sudler stated, as a point of order,
that this was not the issue being discussed.
Page 15
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 15
Responding to Mr. Sudler, Ms. Duffy stated that the request was to convert the park to a dog park.
Mr. Sudler advised that he had gone to the park and noted that the area may be open space; however,
he had seen "City of Dover Property", and he stated that the City of Dover owns it. He thanked
Ms. Duffy and Ms. Taylor for coming out and expressing their concerns and suggested, if there were
additional concerns, that a conversation be held outside of Council Chambers with Mr. David Hugg,
Acting Director of Planning and Community Development.
Mr. Slavin expressed his thanks that the request was brought forward to members. He explained that
this is how parks are born in the City, when people come forward saying that there is a need for
recreation, etc. Mr. Slavin noted that he had no idea what it takes to put a dog park in; however,
Mr. Hugg's office would be able to identify that. He indicated that there are key questions about who
owns the land and how much land, and there would be issues about parking, etc. Mr. Slavin stated
that they should understand that a unique park, like a dog park, would likely attract more vehicular
traffic from people outside the neighborhood and this would be a consideration.
Mr. Matt Rooney, 118 Linden Court, stated that he had resided there for ten years. He advised that
he was for the dog park, which would do nothing but help the community, bring it together, and do
good things for it.
Ms. Paula Duffy, 104 Teak Court, stated that she is a homeowner and had been a resident there for
20 years. She advised that she thought that it was imperative and a good cause to see if the project
could come into effect. Ms. Duffy indicated that it would be nice to have some place in their
community for dogs to go, stay off the property, and have a place to run. She noted that they were
talking about dogs, but it is a family community and it would be nice to have a place for the children
to be able to play as well.
Ms. Mary E. Bradley, 209 Mahogany Place, stated that she had written the letter strongly opposing
the dog park. She asked if members had read the letter or were aware of its points. Responding,
Mr. Slavin noted that the letter had been emailed to members and paper copies were provided during
the meeting.
Mr. Anderson thanked everyone for their opinions and engagement.
Mr. Cole advised that the dog park issue was something that he had always been interested in, stating
that he had met with Officer Christopher Hermance and the K-9 officer from the Dover Police
Department approximately one (1) year ago. He indicated that the Police Department was looking
at writing grants and different things to try to find funds, as well as where to put a dog park.
Mr. Cole stated that he was unsure where the Police Department was with following through and
recommended that Mr. Hugg, Mrs. Donna Mitchell, Acting City Manager, or whoever is moving
forward with this matter match up with the Police Department.
Mr. Anderson moved to recommend acceptance of the petition and the letter, seconded by
Mr. Sudler.
Page 16
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 16
Responding to Mr. Slavin's request for clarification on the motion, Mr. Anderson stated that the
motion would accept the petition and letter into the record. Mr. Slavin requested an amendment to
accept and refer the matter to Mr. Hugg for further development of the proposal.
Mr. Anderson moved to recommend acceptance of the petition and letter and referral of the matter
to Mr. Hugg, seconded by Mr. Sudler.
Mr. Slavin stated that this matter would come back to the Committee for full vetting once the
property ownership issue, space requirements, etc., are understood. He noted that he wanted to be
clear that the request was not approved and that members were just recommending approval to have
a dialog about it.
Mr. Sudler thanked everyone, whether for or against the proposal, for coming forward and stating
their opinions.
The motion to recommend acceptance of the petition and letter, and referral of the matter to
Mr. Hugg was unanimously carried.
Mr. Hugg advised that he would look into whether the Acorn Farms park area was City property or
not. He stated that he believed that it was owned, operated, and managed by the HOA.
Proposed Resolution No. 2017-11 In Support of Delaware Outdoor Recreation, Parks and
Trails (ORPT) Grant Application - Dover Park Master Plan and Schutte Park Phase I
Improvements
Mr. David Hugg, Acting Director of Planning and Community Development, stated that, in May or
June 2017, he advised Council that the City had been invited to submit pre-applications for possible
park development grants from the State. He noted that this was done, in accordance with State
deadlines, and the City was asked to submit formal applications for two (2) of the three (3) projects
applied for. Mr. Hugg informed members that, as of September 8, 2017, applications were submitted
for 50% matching funds for the Dover Park Master Plan and approximately 35% matching funds for
the improvements at Schutte Park. He indicated that the amount of money that the City was able to
obtain was less than the actual cost of the improvements that staff wanted to carry out. Mr. Hugg
stated that both projects were pending final approval and staff hoped to hear the results soon. He
advised that one (1) of the requirements for funding would be adoption of a resolution by Council
authorizing Mr. Hugg as the appropriate City official to accept the grant applications and funding,
and to manage the projects.
Staff recommended adoption of Resolution No. 2017-11.
Mr. Anderson asked if the covenant restrictions that the City would enter into would apply only to
the improvements and if the restrictions would interfere with putting in or expanding indoor facilities
at these locations. Responding, Mr. Hugg advised that all of the properties that the City acquires
using federal or State recreation funds have an associated covenant that the improvement or property
shall be used in perpetuity for outdoor recreation, or for whatever the purposes were. He reminded
members that the City had been working on a transfer of land with Capitol Baptist Church in
Page 17
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 17
Mayfair, noting that the City acquired a piece of property there with State funds many years ago and
was trying to work out a land swap with the church. Mr. Hugg explained that the covenant would
be limited to the things that are actually being funded and would go with the property, noting that
if the City were to do something different later, this would have to be addressed. He advised that
it would not restrict the City in terms of anything else it does unless the City applies for grant funds
for that purpose.
Mr. Lewis asked if the funds would be put toward existing issues and repairs rather than anything
new. Responding, Mr. Hugg stated that the funds were for continued improvements. He explained
that the funds for Dover Park would be used to develop a master plan, like the plan completed last
year for Schutte Park. Mr. Hugg advised that Mr. Eddie Diaz, Planner I, would be the project lead
and the City would contribute in-kind services for a substantial majority of its share of the 50/50
matching grant. He indicated that Schutte Park funding would be used to begin implementing the
master plan that Council adopted earlier in the year. Mr. Hugg stated that the funds would be used
to continue one (1) of the loop trails, explaining that the trail would extend along the road that goes
to Wyoming Mill Road, cut back across the park south of the fields, and go back to the Pitts Center.
He advised that the grant would also provide for drainage improvements for the parking lots and
grading, design, and seeding of new playing fields in the north quadrant. Mr. Hugg indicated that
these new improvements were consistent with the capital budget items that were approved as part
of the current and previous year budgets. He explained that the improvements in Dover Park could
be the subject of a later application, and if it was desired to do a management process for the wooded
area, remove and re-align some of the parking, or put in new facilities, the City could go back and
seek additional State funding for that purpose.
In response to Mr. Anderson, Mr. Hugg stated that these expenses were budgeted in the current year.
He noted that the capital program has a couple of levels of funding specifically for large and small
park development projects that would be used. He indicated that there were also funds in the
Parkland Reserve Fund, which was a separate fund.
Mrs. Donna Mitchell, Acting City Manager, explained that $15,000 was included in this year’s
budget for small park improvements, which Mr. Hugg had gotten underway, and $66,000 for more
park improvements, $33,000 of which were matching funds from the State. Mr. Hugg advised that
some of these funds would be used for Continental Park.
Mrs. Mitchell stated that approximately $190,000 was budgeted for Schutte Park improvements
based on pre-conceptuals from the master plan designed by Mr. Diaz. She noted that the preliminary
set of numbers was based on the conceptual opinion of the engineer and not fine tuned.
Mrs. Mitchell explained that the total master plan engineering costs were $9M, which the City does
not have; however, Mr. Hugg was trying to get in pieces of the plan as he could. She indicated that
the plan includes laying everything over with sod, and has a lot of components, and there was a need
to make determinations regarding what would be done and what the City can afford to do at the park.
Mrs. Mitchell noted that there were still other parks to be done. She advised that the $190,000
would come from the reserve. Mrs. Mitchell noted that the reserve balance was approximately
$300,000 last year and she would have to get a new balance; however, it was being depleted and
would not have a lot of money in it next year.
Page 18
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 18
Mr. Neil moved to recommend adoption of Resolution No. 2017-11 (Attachment #2), as
recommended by staff. The motion was seconded by Mr. Anderson and unanimously carried.
Mr. Hugg reminded members that staff had applied for an AARP Community Challenge Program
grant that was competitive nationwide, and he announced that the City of Dover’s project was
one (1) of 89 projects nationwide, and the only project in Delaware, that was awarded funds. He
noted that AARP had already sent $2,000 for promoting and starting signage for the re-opening of
the bicycle and pedestrian pathway system along North Street, from the railroad extending to where
construction had been undertaken. Mr. Hugg advised that the project must be completed by
November 1st and that he was very pleased to get it. He thanked Mr. Diaz, who put the application
together in approximately an hour and submitted it, and he noted that there should be an
announcement in the newspaper soon.
Update - Continental Park
During the Regular City Council Meeting of August 14, 2017, members received the Continental
Park’s Workshop Update and accepted the July 2017 Chair’s Report. During their August 14, 2017
meeting, members also considered a Back to School Giveaway and Rib-Off Fundraiser Initiative for
Dover Park and Continental Park and endorsed the project and made it a City-sponsored event.
Mr. David Hugg, Acting Director of Planning and Community Development, provided members
with a proposal and quote from Cunningham Recreation for a play area in Continental Park for
children aged two (2) to five (5) (Attachment #3), and advised members that they were able to get
the original price of $17,000 reduced to slightly more than $15,000 for the project. Referring to the
drawing for the Continental Park Proposed Playground for Ages 2-5, Mr. Hugg indicated that the
play area would be placed in Bicentennial Village around the corner from the existing park. He
noted that it would start to meet some of the recreational needs in the community and send the
community a signal that the City heard and listened to them and would respond with an area for
young children to play.
Mr. Hugg informed members that two (2) park benches that had been located near the PNC fountain
were sent to the Public Works Department to be rehabbed and installed on Independence Boulevard
in the existing Continental Park, once road improvements are finished there.
Update - City of Dover Partnership with NCALL - Pop-Up Parks
Mr. David Hugg, Acting Director of Planning and Community Development, informed members that
approximately a month ago staff was approached by the National Council on Agricultural Life and
Labor Research (NCALL) with a request for funds for disposable, consumable items for a pop-up
park program that NCALL does periodically in the City. He noted that this concept has also been
referred to as a play in the streets or street playground and is a one-morning or one-day program
where the street is blocked and play equipment is brought in for an ad hoc park for the kids in the
neighborhood. Mr. Hugg advised that Mr. Slavin had generously authorized Mr. Hugg to give
NCALL some funding to buy equipment. He noted that funds would be used to buy play equipment
instead of helping to buy items like sodas and hot dogs. Mr. Hugg stated that staff had been a little
delayed in getting this project off the ground; however, they found NCALL some storage space in
the City warehouse for the items, since security and a storage place were concerns. He advised that
Page 19
COUNCIL COMMITTEE OF THE WHOLE MEETING
OF SEPTEMBER 12, 2017 PAGE 19
NCALL was hoping to hold one (1) more pop-up park before the end of the warm weather and that
he would make sure that Council and Committee members are made aware of it as soon as he knows
when it will occur.
Mr. Sudler welcomed Dr. Warfield as a new member of the Parks, Recreation, and Community
Enhancement Committee and thanked her for accepting the challenge and filling out an application.
He noted that he had previously had the pleasure of serving with Dr. Warfield on the Dover Human
Relations Commission and knew that she would be a great contributor.
Mr. Neil moved for adjournment of the Parks, Recreation, and Community Enhancement
Committee meeting. The motion was seconded by Mr. Cole and unanimously carried.
Meeting adjourned at 7:43 p.m.
Mr. Anderson moved for adjournment of the Council Committee of the Whole meeting. The
motion was seconded by Mr. Hare and unanimously carried.
Meeting adjourned at 7:43 p.m.
Timothy A. Slavin
Council President
TAS/TM//js/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2017\09-12-2017 CCW.wpd
Attachments
Attachment #1 - Correspondence from Ms. Mary E. Bradley, dated September 11, 2017, regarding Acorn Farms
Attachment #2 - Proposed Resolution No. 2017-11
Attachment #3 - Quote #125942 from Cunningham Recreation - City of Dover Continental Park - Ages 2-5 Play Area,
provided by Mr. David Hugg, Acting Director of Planning and Community Development
Page 20
ATTACHMENT #1
Council Committee of the Whole Meeting of 09/12/2017
From: Bradley, Mary E. (Student)
To: City Clerks Office
Cc: mary.e.bradley@state.de.us
Subject: September 12 - Acorn Farms
Date: Monday, September 11, 2017 9:36:41 AM
Attachments: City of Dover Council 9.12.17.pdf
Dear City of Dover Council Committee,
I am writing to express my concern with the agenda item for the Request for Dog Park and
Passive Playground in Acorn Farms. I am strongly opposed to this request for the following
reasons.
When I purchased my home in Acorn Farms 14 years ago, the Homeowner Association
fee had just increased to $100 annually. Since then, it has increased in $20 increments
about every 3 years. ($120; $140; to $160 and due to the state budget crunch, it is on
the table for yet another increase). The residents of Acorn Farms get absolutely nothing
for this annual cost except for very poor quality grass cutting service in the common
areas. If a dog park and passive playground are established, this will increase the
Homeowners Association fee substantially. The majority of the homeowners in this
duplex development are single women, retirees, and young couples just starting out.
The turnover of these young couples with children is very frequent. The substantial
increase due to the cost to build the dog park and playground, the cost to maintain
the area and playground equipment, and increase in liability insurance will cause a
substantial burden on the single, mature, and permanent residents of the
community.
There is a new dog park and playground area exactly 3 miles east of Acorn Farms
behind the Little Creek Post Office.
Who will maintain the dog park and playground? Many of the residents don’t even
maintain their own homes and lawns. There are more important issues that need to be
addressed and improved upon within the neighborhood without the addition of a dog
park and playground.
People do not cut their grass, trim, or weed on a regular basis. They do not keep
their porches and walkways neat and clean. They do not keep their (shared) rain
gutters clear of debris causing potential damage and injury. Those whose houses
face north do not pressure wash their houses often enough to prevent mold from
developing.
There is a problem of random trees reseeding behind the properties, in the
common areas, and in the drainage system. These trees are a nuisance.
People do not cut and clear reseeded trees, weeds, and brush from behind their
properties which is not only unsightly, but breeds mosquitos, unwelcome habitat,
and have blocked the drainage system. (Should there be a storm causing major
flooding, the water will back-up into their property if not in their homes and cause
damage. Of course these residents will not accept responsibility and will more
Page 21
likely blame the Homeowners Association for not maintaining the drain - possibly
bringing suit against the Association for cost recovery of damages.)
(Homeowners Association rules clearly state that the residents are responsible for
maintaining property located behind their homes, for keeping the drainage system
clear, and maintaining the right of way in front of their homes to include
sidewalks and mailboxes).
Many residents do not contain their dogs and cats. Cats have been a
nuisance and dogs have often run loose throughout the development. Even
when being walked by the owner, often the dogs are not leashed. Stray dogs
running loose has been a common and ongoing problem along North Little
Creek Road and Acorn Lane for many years. A dog park will add to this
problem. A play ground will be unsafe from dog bites/attacks for children
unsupervised.
Unsupervised children have been a problem in the past.
There are registered sex offenders in the neighborhood. I accidentally
discovered this information when searching ownership of a home I thought was a
rental when actually the sex offenders are the owners and occupy the house (205
Mahogany Place). Residents were not made aware of this. How many other
sex offenders live in the community that we are not aware of?
There is often suspicious activity in the neighborhood such as cars parked at the
entrance and circling around certain houses that have had suspected drug activity.
Careless driving and speeding is another issue within the development causing an
unsafe environment for dogs and children playing.
In summary, I understand that there was a petition circulated through the neighborhood and
those who initiated the possibility of a dog park and playground may have had good
intentions. However, having lived in Acorn Farms for as many years as I have, having
experienced and witnessed what I have, this is not a safe neighborhood and has too many
issues that need attention. Without proper supervision, funding, and maintenance care, the
dog park and playground will not be safe and will eventually become nothing more than an
eye sore and an attraction for undesirable activity.
Sincerely,
Mary E. Bradley
209 Mahogany Place
Dover, DE 19901
(302) 672-9481
Page 22
ATTACHMENT #2
Council Committee of the Whole Meeting of 09/12/2017
City of Dover
MAYOR AND COUNCIL
1 PROPOSED COUNCIL RESOLUTION NO. 2017-11
2 A RESOLUTION IN SUPPORT OF DELAWARE OUTDOOR RECREATION, PARKS AND
3 TRAILS (ORPT) GRANT APPLICATION - DOVER PARK MASTER PLAN AND SCHUTTE
4 PARK PHASE I IMPROVEMENTS
5 WHEREAS, the City of Dover has worked with residents in the Dover Park neighborhood to begin a
6 process to restore Dover Park to its Anchor Park status and has approved and adopted a master plan for the
7 future development of Schutte Park; and
8 WHEREAS, the City of Dover has filed ORPT Grant pre-applications with the Delaware Division of Parks
9 and Recreation for both purposes and has been authorized to submit formal ORPT applications in the
10 amount of $30,000 for the development of a Master Plan for Dover Park, and $70,000 for Phase I
11 improvements at Schutte Park and the City has set aside funds in the Parkland Reserve and General Fund
12 to support these efforts; and
13 WHEREAS, the City of Dover designates David S. Hugg III, interim Director of Planning and Community
14 Development and Parks and Recreation to manage the project and coordinate ORPT Program requirements
15 for reporting and reimbursement; and
16 WHEREAS, the City understands that these improvements funded through the ORPT Grant Program will
17 remain in outdoor recreation uses in perpetuity.
18 NOW, THEREFORE BE IT RESOLVED by the Mayor and Council of the City of Dover that the
19 application for ORPT Grant funding for Dover Park and Schutte Park is authorized and the City of Dover
20 shall abide by all the requirements of the ORPT Grant Program for reimbursements and stewardship
21 responsibilities.
22 ADOPTED: *
23 S:\RESOLUTIONS-PROCLAMATIONS-TRIBUTES\2017\DRAFT\RESOLUTION NO. 2017-11 DELAWARE OUTDOOR RECREATION, PARKS AND TRAILS (ORPT) GRANT APPLICATION\Resolution
24 No. 2017-11 IN SUPPORT OF DELAWARE OUTDOOR RECREATION, PARKS AND TRAILS (ORPT) GRANT APPLICATION.wpd
25
26 ROBIN R. CHRISTIANSEN TIMOTHY A. SLAVIN
27 MAYOR COUNCIL PRESIDENT
28 Actions History
29 09/12/2017 - Scheduled for Introduction - Council Committee of the Whole/Parks, Recreation, and Community Enhancement
30 Committee
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 23
ATTACHMENT #3
Cunningham Recreation
Council Committee of the Whole Meeting of 09/12/2017
PO Box 487 QUOTE
Queenstown, MD 21658 #125942
800-233 -0529 FAX 410-827-8855
09/07/2017
City of Dover - Continental Park - Ages 2-5 Play Area
City of Dover Dept. of Parks and Recreation Project#: P89529
Attn: Wayne Voshell Ship To Zip: 19701
P.O. Box 475
Dover, DE 19903
Phone: 302-674-7541
Fax: 302-678-2674
WV oshell@dover.de. us
GSS16641 Cunningham Recreation - State of Delaware
Playground and Recreation Equipment and
Accessories Contract -
• Contract Number: GSS16641 -
Playground
• Contract Tenn: August 1, 2016 tbru July
31,2018.
RDU GameTime - Custom PrimeTime Modular $8,253 .00 $8,253.00
Play Structure for Ages 2-5
[Basic:_ _ _ __,
[Deck:Pvc: _ _ _---=--=' [Roof _ _ _ -=-_,
[Accent: [Arch:_ _ _ __,
[Roto Plastic:_ __ __J
(4) 12027 -- 3 112" Uprt Ass'Y Alum 12'
(1) 18200 -- 36" Sq Punched Deck PIT 1.3125
(1) 18671 -- Shingle Roof
(1) 19013 -- Transfer Platform WI Barrier (3')
(1) 19035 -- Optional Access Step (3' & 5')
(1) 19047 -- Tree (3; & 3'6")
(1) 19122 -- Wave Zip Slide (2'-6" & 3')
(1) 19158 -- Zoo Panel
(1) 19247 -- How Tall Am I
5032 GameTime - 2-5 Age Appropriate Fiberglass $1, l 01.00 $1 ,101.00
Sign [Basic: _ _ _ _ _,
2 28009 GameTi.me - 6' PIS Bench WIBack Inground $540.00 $1,080.00
[Basic: [Coated
Site:_ __ _ _,
19 4862 GameTime - Playground Border $48.00 $912.00
1 4858 GameTime -Access Playcurb-WIAdap $495.00 $495.00
178749 GameTime - Owner'S Kit $50.00 $50.00
1 MISC GameTime - Owner's Kit (No Charge) ($50.00) ($50.00)
88 INSTALL PSP - Receive, Inspect, Deliver and Install $42.00 $3,696.00
Playground Equipment, Sign and Benches
Page 1 of3
Page 24
Cunningham Recreation
PO Box 487 QUOTE
Queenstown, MD 21658 #125942
800-233-0529 FAX 410-827-8855
09/07/2017
Ct ..,. : . ..... i • J•t \,,.
City of Dover - Continental Park - Ages 2-5 Play Area
1l • 11
6 INSTALL PSP - Receive, Inspect, Deliver and Install $42.00 $252.00
Border System
3 INSTALL PSP - Supply and Install Fabric under Safety $42 .00 $126.00
Surfacing
15 INSTALL PSP - Receive, Inspect, Deliver and Install (2) $42.00 $630.00
4' Benches for the Community (not shown on
plans)
Safety Surfacing to be quoted seaparetly under Delaware State SubTotal: $16,545.00
Contract GSSJ 6583-MULCH. Discount: ($754.02)
Total Amount: $15,790.98
Site must be clear, level, free of obstruction and accessible. Site work
is not included in the proposal, unless stated otherwise, and will be the
responsibility of the owner.
Pricing: Prices are firm for 30 days unless otherwise noted. Above costs assume one shipment and one installation unless otherwise noted. Taxes
will be shown as a separate line item if included. Any applicable taxes not shown will be applied to final invoice.
Lead Time/Shipment: Standard orders shipped 4 weeks after receipt of order and acceptance of your purchase order, color selections, approved
submittals,(ifrequired)unless otherwise noted. Custom equipment and shades may require a longer lead time. Surfacing lead time is
approximately 2 weeks after scheduling request. It is the responsibility of the owner to offload and inventory equipment, unless other
arrangements have been made. Missing or damaged equipment must be reported within 60 days of acceptance of delivery. Equipment may be
sent in multiple shipments based on point of origin.
Pavment Terms: Net 30 days subject to approval by Credit Manager. A signed P.O. made out to Cunningham Recreation or this signed
quotation is required for all orders unless otherwise noted. A 1.5% per month finance charge will be imposed on all past due accounts. Equipment
shall be invoiced separately from other services and shall be payable in advance of those services and project completion. Checks should be made
payable to Cunningham Recreation unless otherwise directed.
Acceptance of this proposal indicates your agreement to the terms and condition stated herein.
Site should be clear, level and allow for unrestricted access of trucks and machinery. Customer is responsible for providing a secure
location to off-load and store the equipment during the installation process. The customer is responsible for theft or damage of the
equipment from the time the equipment is off-loaded until the installation of the equipment is complete, unless other arrangements are
made and noted on the quotation. Price includes ONLY what is stated in this quotation. If additional site work or equipment is needed
then the price is subject to change. Customer shall be responsible for unknown conditions such as buried utilities (public & private), tree
stumps, rock, or any concealed materials or conditions that may result in additional labor or materials cost. Customer will be billed
hourly or per job for any additional costs.
Acceptance of quotation:
Accepted By ( p r i n t e d ) : - - - - - - - - - - - - - - - Date:-- - - -- -- - - - -- -
Title: P.O. No: _ _ _ __ __ _ _ __ ~
- - - - - - - - - - - - - -- - - -- --
Telephone: ·_ - - - - -- - - - - - - -- - - - - Fax:
- -- - -- -- - - - -- -
Purchase Amount: $15,790.98
SALES TAX EXEMPTION CERTIFICATE#:
---------------~
(PLEASE PROVIDE A COPY OF CERTIFICATE)
Salesman Signature Customer Signature
Page 2 of3
Page 25
Cunningham Recreation
PO Box 487 QUOTE
Queenstown, MD 21658 #125942
800-233-0529 FAX 410-827-8855
09/07/2017
Q..,.~ , • n.~-~ • iii'L/' 1'
City of Dover - Continental Park - Ages 2-5 Play Area
ORDER INFORMATION:
Bill to: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ship to: - -- - -- -- - - - -- - -
Contact:
- - - - - - - - - - - - - - - Contact: --------------~
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Address: _ __ _ _ _ _ _ _ _ __ _ __
Address:
- - - - - - - - - - - - - - - Address: - - - -- -- - - - - -- - -
City, State, Zip: _ _ _ _ __ _ _ _ _ __ _ City, State, Z i p : - - - - - - - - - - - -
Tel: _ _ _ _ _ __ __ Fax: _ _ _ _ _ _ _ Tel : _ _ _ _ _ _ _ _ Fax: _ _ _ _ _ __
Page 3 of3