CITY OF DOVER PLANNING COMMISSION
AGENDA
Monday, November 20, 2017 – 7:00 P.M.
City Hall, City Council Chambers
15 Loockerman Plaza, Dover, Delaware
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF AGENDA
ADOPTION OF MINUTES OF REGULAR MEETING of October 16, 2017
COMMUNICATIONS & REPORTS
1) The Annual Meeting of the Planning Commission typically held in July including the
election of Chairman and Vice Chairman will be scheduled for a future meeting upon
completion of the appointment process for Commission members.
2) Reminder: The next Planning Commission regular meeting is scheduled for MONDAY,
December 18, 2017 at 7:00pm in the City Council Chambers.
3) Notice: The Planning Commission Quarterly Workshop scheduled in November 2017 has
been canceled.
4) Update on City Council Actions
5) Update from Planning Office
OPENING REMARKS CONCERNING APPLICATIONS
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval: None
NEW APPLICATIONS
1) C-17-05 Loockerman Coffee Shop at 14 Loockerman Plaza – Public Hearing and Review of
Application for Conditional Use to permit conversion of an existing 820 SF 1 1/2-story
structure into a restaurant (coffee shop). The subject site consists of two parcels totaling an
15,191.66 S.F. +/- (0.139 +/- acres). The property is zoned RGO (General Residence and
Office Zone) and is within the H (Historic District Zone). The property is located on the
south side of Loockerman Plaza and east of South State Street. The owner of record is The
New Parsonage, LLC and the lessee is Kristin Stonesifer. Location Address: 14 Loockerman
Plaza. Property Addresses: 203 and 205 South State Street. Tax Parcels: ED-05-077.09-05-
01.00-000 and ED-05-077.09-05-01.01-000. Council District 4.
Page 2
City of Dover Planning Commission Agenda
Public Hearing: November 20, 2017
Page 2 of 2
2) S-17-28 Multiplex at 299 College Road – Public Hearing and Review of a Site
Development Plan application to permit construction of a three (3) unit multiplex
residential building (multi-family dwelling) with adjoining parking spaces. The property
consists of a 18,244 S.F. +/- parcel (0.42 +/- acres) and is zoned RM-2 (Medium Density
Residence Zone). The property is located on the northwest side of College Road and
adjacent to Conwell Street. The owner of record is Stephen E. Lumor (Enyam, LLC).
Property Address: 299 College Road. Tax Parcel: ED-05-067.00-02-26.00-000. Council
District 4.
3) S-17-29 Delaware State University Residence Hall at 1200 N. DuPont Highway: Master
Plan – Public Hearing and Review of a Site Development Master Plan to permit phased
construction of a new 190,000 S.F. five-story Student Residence Hall. The project phases
consist of the following: Phase 1- Relocation of Utilities, Phase 2 - Construction of
Residence Hall (600 Beds) and Demolition of Laws Hall, and Phase 3 - Demolition of
Tubman Hall. The subject project area consists of 209,088 +/- S.F. (4.80 +/- acres) internal
to the Delaware State University Campus of 287.32 +/- acres. The property is zoned IO
(Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection Overlay
Zone) – Tier 3: Excellent Recharge Area. The campus is location west of North DuPont
Highway and north of College Road. The owner of record is State of Delaware c/o
Delaware State University. Property Address: 1200 North DuPont Highway. Tax Parcels:
ED-05-057.00-01-19.00-000, ED-05-057.00-01-20.00-000, and ED-05-057.00-01-21.00-
000. Council District 4.
4) MI-17-03 Text Amendments: Adult Day Care Facilities – Public Hearing and Review for
recommendation to City Council on a series of Text Amendments to the Appendix B:
Zoning Ordinance, Article 3 – District Regulations, Article 5 – Supplementary Regulations,
and Article 12 - Definitions. The proposed Ordinance establishes provisions for Adult Day
Care facilities allowing them to be permitted in any zoning district provided that state
licensing and city code requirements have been met. Other amendments update references
and definitions to make the distinction between Child Day Care facilities and Adult Day
Care facilities. Ordinance #2017-13.
A copy of the Proposed Ordinance #2017-13 is available on the City’s website
www.cityofdover.com under the Government Heading: Ordinances, Resolutions &
Tributes. https://www.cityofdover.com/ordinances-and-resolutions
The Legislative, Finance, and Administration Committee reviewed the proposed Text
Amendments on September 25, 2017 and the First Reading before City Council
occurred on October 9, 2017. The Public Hearing before the Planning Commission is
set for November 20, 2017and Public Hearing and Final Reading before City Council
is on December 11, 2017.
NEW BUSINESS
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Posted Agenda: November 9, 2017
Page 3
CITY OF DOVER PLANNING COMMISSION
OCTOBER 16, 2017
The Regular Meeting of the City of Dover Planning Commission was held on Monday, October
16, 2017 at 7:00 PM in the City Hall Council Chambers with Chairman Mr. Tolbert presiding.
Members present were Mr. Holden, Mr. Roach, Ms. Edwards, Mr. Holt, Mr. Baldwin, Mrs.
Welsh, Ms. Maucher and Mr. Tolbert. Dr. Jones was absent.
Staff members present were Mr. Dave Hugg, Mrs. Dawn Melson-Williams, Mr. Eddie Diaz, Mr.
Julian Swierczek and Mrs. Kristen Mullaney. Also present were Mr. Alex Schmidt, Mr. Sam
Chick, Mr. Garth Jones, Mr. Conny Malmberg, Mr. Jamie Sedler and Mr. Brian Finnegan.
APPROVAL OF AGENDA
Mrs. Welsh moved to approve the agenda as submitted, seconded by Mr. Holt and the motion
was unanimously carried 8-0 with Dr. Jones absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF
SEPTEMBER 18, 2017
Mr. Holt moved to approve the Planning Commission Meeting minutes of September 18, 2017,
seconded by Mrs. Welsh and the motion was unanimously carried 8-0 with Dr. Jones absent.
COMMUNICATIONS & REPORTS
Mr. Hugg stated the Annual Meeting of the Planning Commission which would normally be held
in July that would have included the election of the Chairman and Vice Chairman will be
rescheduled for a future meeting upon completion of the appointment process. We are still
waiting for Council’s action he believes.
Mr. Hugg stated that the next Planning Commission regular meeting is scheduled for Monday,
November 20, 2017 at 7:00pm in the City Council Chambers.
Mr. Hugg stated that the Planning Commission Quarterly Workshop scheduled in November
2017 has been canceled. They do not have a date for another meeting at this time.
Mr. Hugg provided an update on the regular City Council and various Committee meetings held
on September 25 & 26, 2017 and October 9 & 10, 2017.
Mrs. Melson-Williams stated that the Planning Office did meet this past week to do some type of
long range planning for the Planning Office. They will certainly be bringing a number of items
forward to the Planning Commission as a result of these various studies, research and Ordinance
writing in the upcoming year.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the
meeting.
OLD BUSINESS
1
Page 4
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
1) Requests for Extensions of Planning Commission Approval: None
2) Revisions to Applications:
A. S-17-19 Bay Road Office Park Master Plan: Revised Plan – Update on Plan Revisions to
a Site Development Master Plan conditionally approved by the Planning Commission on
July 17, 2017. The Revised Plan for the construction of Bay Road Office Park is now
proposed to consist of three buildings and a stormwater management facility in three
phases. The buildings proposed include three office buildings; the previously proposed
flex/warehouse building has been replaced with a stormwater management facility. The
subject properties consist of a 5.00 acre +/- parcel and a 1.46 acre +/- parcel. The
properties are zoned C-4 (Highway Commercial Zone). The property is located on the
southwest side of Bay Road and south of Miller Drive with access from Cowgill Street
and Martin Street. The owner of record is Bay Road One, LLC. Property Address: 550
Bay Road. Tax Parcels: ED-05-077.00-01-10.01-000 and ED-05-077.00-01-11.00-000.
Council District 2.
Representatives: Mr. Alex Schmidt, Century Engineering
Mrs. Melson-Williams stated that this is an update on what was a Master Plan that was reviewed
by the Planning Commission in July 2017. That proposal for the Bay Road Office Park consisted
of a project that was to be four buildings in four phases. The engineer has continued to work on
the refinement of the site design for this project and as such, has communicated to the Planning
Office that there are some proposed revisions. Specifically, there are two main things that have
happened. In testing the soils on the site, it has turned out that they will need a very large
stormwater management facility. They have chosen to locate that on the far western portion of
the property which was the location of the proposed Building 4 which was to be a flex
warehouse space. Phase 4 Building 4 is no more and there is a stormwater management facility
that will likely be constructed in the early phases of the project in that location instead. Secondly,
the applicant has worked to include a cross access connection from this main parcel to the parcel
to the south. That is a requirement of some of their workings with DelDOT in regards to the
project site. This site’s location on Bay Road requires Entrance Plan approval with DelDOT and
the cross-access connection is now being shown on the plan. It is an item of information and if
there are questions, they can certainly try to address those. With it being a Master Plan, the
Master Plan appeared before the Planning Commission and then with that approval, it makes the
project eligible for the Planning Office’s Administrative Site Plan review process for each phase.
Mr. Schmidt stated that the overview sounded good to him and he is happy to answer any
questions that the Commissioners may have. He agrees with the comments and will work with
Staff.
Mr. Holden questioned if the Kent Conservation District is allowing them to claim quality
treatment and stormwater with a wet pond? Responding to Mr. Holden, Mr. Schmidt stated that
they are. Under the new revisions to the stormwater regulations, if you provide 48 hour extended
detention in the wet pond they will allow that to be considered quality treatment.
2
Page 5
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
Mrs. Welsh moved to approve S-17-19 Bay Road Office Park Master Plan Revised Plan,
seconded by Mr. Holt and the motion was carried 8-0 by roll call vote. Mr. Holden voting yes;
it’s a change required due to site considerations that doesn’t cause any impingement upon the
original plan. Mr. Roach voting yes. Ms. Edwards voting yes; based on the reasons previously
stated. Mr. Holt voting yes; based on the reasons previously stated. Mr. Baldwin voting yes;
based on the reasons previously stated. Mrs. Welsh voting yes; the change is due to
environmental conditions that have been addressed quite well. Ms. Maucher voting yes; for the
reasons previously stated. Mr. Tolbert voting yes; the revision is a necessity and will facilitate
the progress of this application.
NEW BUSINESS
1) HI-17-03 Sign Permit #17-1484: Wall Sign at 115 West Loockerman Street– Appeal of the
Historic District Commission’s Review of the Architectural Review Certification for Sign
Permit application #17-1484 pertaining to the installation of an internally lit wall sign at
Puffster Smoke Vape Lounge. The property is zoned C-2 (Central Commercial Zone) and is
subject to the H (Historic District Zone). The property is located on the north side of West
Loockerman Street between South Governors Avenue and South Bradford Street. The
owners of record are Samuel G. and Nicole M. Chick. Property Address: 115 West
Loockerman Street. Tax Parcel: ED-05-077.09-02-07.00-000. This application was referred
by the City Planner to Historic District Commission for their meeting on September 21,
2017.
Representatives: Mr. Sam Chick, Owner
Mrs. Melson-Williams stated that this application is a Sign Permit specifically related to a wall
sign at 115 West Loockerman Street. This is an appeal of the Historic District Commission
action regarding this Sign Permit. Provided in the Commission’s packet is the Architectural
Review Report and a number of attachments pertaining to this item. This project started with a
Sign Permit application, Permit #17-1484 that was submitted for review. The property at 115
West Loockerman Street is located within the Historic District and as such, any exterior
improvements are subject to the Architectural Review Certification process. Typically with Sign
Permits, they are a type of application that can be reviewed by Planning Staff as part of the
permit process. This Sign Permit started with that review and ultimately was issued on
September 9, 2017 with conditions specific to that Architectural Review Certification. The wall
sign that was approved is a sign that is mounted on the front façade of the building between the
awning and the second floor windows on that building. The specific details of the Sign Permit
application are actually included in the packet. Staff had a series of findings in review of that
Sign Permit application specifically outlined in the Report that address sign format, its location
and size. The specific question then relates to sign materials and the illumination of the sign. The
permit was issued with the caveat that the sign could not be internally illuminated. Staff found
that that was not in keeping with the Design Standards and Guidelines of the Historic District
Zone which is the guiding document for review of exterior work in the district. Staff did refer the
Sign Permit to the Historic District Commission so that they could consider that proposal for the
installation of what would be an internally light wall sign and to deal with that portion of the
sign. The Historic District Commission met at their meeting of September 21, 2017. They were
3
Page 6
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
provided the Sign Permit application materials as well as a reference report of the Staff’s
findings and the references to the Design Standards and Guidelines. Specifically in the Design
Standards and Guidelines there is a section of Chapter 5 that deals with signage specifically.
They have provided that excerpt from the Design Standards and Guidelines to the Commission.
At the Historic District Commission meeting, there were four members present. There were two
motions. Both motions failed in that they resulted in tie votes of the members present. The first
motion was to not recommend the backlighting of the sign; that motion failed. The second
motion was to allow the lighting of that sign and that motion also failed as a result of the 2-2
vote. Therefore, coming out of the Historic District Commission, there was no additional action
so the decision of the City Planner that the Architectural Review Certification was not issued for
the internal illumination of the wall sign stood. At the Historic District meeting, Staff did
identify a number of options for the applicant in that they could seek to defer action with the
Historic District Commission seeking a full complement of their members being present or they
could make an appeal to the Planning Commission. They verbally expressed an interest to appeal
the decision on this Architectural Review Certification to the Planning Commission. The
Planning Commission is charged with determining if the proposal for internal illumination of the
wall sign should be granted Architectural Review Certification. Tonight, the packet includes the
initial letter of referral to the applicant that sent the permit initially to the Historic District
Commission and a copy of the Sign Permit application materials including the permit copy as
issued for the installation of the sign with the no illumination condition placed upon it. There is
also the excerpt on signage from the Design Standards and Guidelines as well as a copy of the
Draft Meeting Minutes from the Historic District Commission meeting. This evening is the
opportunity for the Planning Commission to determine if the proposal should be granted an
Architectural Review Certificate in order to illuminate the sign internally.
Mr. Holt questioned what alternative the applicant would have for his sign? He has got to be able
to show off his business and people have to be able to see his sign and know where the business
is.
Ms. Edwards questioned if any of the other businesses in Downtown Dover that have box signs
have the ability and permission to light internally? Responding to Ms. Edwards, Mrs. Melson-
Williams stated that there are a number of box signs that exist along the Loockerman Street
corridor. Some of them pre-date the existence of the Design Standards and Guidelines for the
Historic District. They are allowed to be refaced. She is not sure how many of them may include
internal illumination. For example, there are some that very clearly date from at least the 1960’s
such as the one that was most recently for the Brunch N Lunch. The Zuha Trend is a more recent
reface of those box signs for that tenant. She is not sure if they are actually illuminated in the
evening. Most illumination of signs in the district occurs by what they call the indirect lighting.
They are externally illuminated through a light fixture that then shines down on the wall surface
for the sign. The other sign of note related to internal illumination or external illumination came
with the Family Dollar development a number of years ago. If you look at those signs, they look
like the regular sign that could be internally lit; however, as part of their approval process
through the Historic District Commission they were only allowed to be externally lit. You can
see the goose neck lamps over those letters. When you get further down to the gas station
facility, certainly some of that is somewhat internally illuminated but in the case of that site there
4
Page 7
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
have been some applications that dealt with the signage and the lighting on that property. It’s a
mixed situation.
Mrs. Welsh stated that she would like to tag on to the issue of the Brunch N Lunch, the Family
Dollar and the Suds Bar signs. She did check those signs out in the evening and they are not
internally lit.
Ms. Maucher questioned if “Inappropriate” was a defined term in the Ordinance? Responding to
Ms. Maucher, Mrs. Melson-Williams stated that the Design Standards and Guidelines setup a
series of practices. There are Recommended practices, Not Recommended practices and
Inappropriate. Specifically in the Design Standards and Guidelines in Chapter 3 it kind of gives
some definition to those terms; they call them types of treatments and they are grouped under the
categories of Recommended, Not Recommended and Inappropriate. The Design Standards and
Guidelines states: “Guidelines that are Recommended represent the best preservation practice
that is those treatments that are most respectful of existing historic fabric. Projects that follow
Recommended guidelines should receive Architectural Review Certificate with little or no
comment. Projects that employ treatments that are Not Recommended, may or may not receive
an Architectural Review Certificate depending upon the valuation and determination by the
Historic District Commission of the overall impact of those treatments on the character of the
structure and the Dover Historic District Zone as a whole. Project that employ Inappropriate
treatments should not receive an Architectural Review Certificate unless there are extenuating
circumstances that warrant approval.”
Mr. Chick stated that he would like to start by saying that this is a decision about whether Dover
wants to be pro-business or anti-business. For as long as he can remember and for the last few
decades, Dover has been trying to re-invigorate Downtown. For a commercial business, part of
that is signage. They have a business that is open during the day and also at night. They are open
on Friday and Saturday until 1:00AM. It is imperative that they have a lit up internally
illuminated sign. They have already had many customers come in and tell us that they thought
that they were closed because the sign was off. This is costing them money; it’s their living and
it’s a very important issue for them. Within a block of their location there are seven other signs
that are internally illuminated and there is another one that is not included on the hand out which
is the Suds Bar. The Suds Bar has the ability to illuminate although they are not open at night.
The Brunch N Lunch did illuminate in the morning; they were not open in the evenings
obviously because it’s a breakfast establishment. Two doors down from their location is Irish
Mike’s with a sign that is much larger and brighter than what they have.
They made a video about this and posted it online to get support from the community. Over 350
people commented on that video that they agreed and that this sign should be illuminated.
Mr. Chick read several comments from a Facebook post.
Mr. Chick asked that the Commission please let them turn the sign on. He got a great deal on it,
he found it at a business that was re-doing their sign. It only costed him $100 and then another
$1,100 to get it refaced. $1,200 for a sign like this is a fantastic deal. As a business person,
especially with a new business, he has to save money where he can. The option of having to look
5
Page 8
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
at several thousand dollars for an alternative sign is not appealing to him. For the Family Dollar,
they decided not to take this to appeals like he did and he thinks that it looks ridiculous. They
have little curly lamps that come over top of the Family Dollar. It looks way out of character.
They were forced to spend money on that that they didn’t need to spend. In the very same letter
that Mr. Diaz sent to him that rejected the permit in the first place, also said that his sign was too
large. Thankfully Mr. Hugg sided on him with this because the Code allowed 64 SF. Originally,
they said that this sign would be out of character for the area because it was too large even
though there is a sign that is two doors away that was larger. Also, inside his building there is an
old wall sign that went up the entire height of the building that was an old advertisement. By
these very same Historic District Guidelines today, that sign would not be allowed. How can you
tell them that there is a sign on this building that pre-existed these guidelines and somehow that
sign is not historical enough for whatever some architect thinks is the proper appeal for
Downtown?
Ms. Edwards stated that she rode down West Loockerman Street at night and she looked at all of
the signs. Her biggest concern here is whether or not there were other signs and businesses in the
area along this corridor that can turn on backlight fluorescent lights. Irish Mike’s sign is very
softly lit. That was one of the questions that she had was how is that sign lit because it’s a very
soft light? She is imagining that the sign for Puffsters is going to be very bright since it’s
fluorescent and back lit. Responding to Ms. Edwards, Mr. Chick stated that Irish Mike’s is
fluorescent lit as well; it will be about the same brightness as Irish Mike’s.
Mr. Roach questioned what the hours of operation are for the business other than Friday and
Saturday night? Responding to Mr. Roach, Mr. Chick stated that they are closed on Sundays and
Mondays, open 11AM-7PM on Tuesdays, Wednesdays and Thursdays so that means that now
that we are going into winter the sign is going to come on at 5PM and then they are open on
Fridays and Saturdays until 1AM. During OktDoverFest he lost tons of business because people
thought that he was closed because they looked at the sign and it was off.
Mr. Holden stated that he thinks in the City they have been challenged sometimes to both desire
a Loockerman Street that looked like the Loockerman Street that some remember and also
wanting a Loockerman Street that is currently active in terms of the business sense and have
people that are frequenting those businesses so it’s tough balance that we seek. To Mr. Chick,
Codes change and signs that were allowed before may not be allowed now. The Codes that
existed when the sign that you spoke of in your store may have been different. The manner in
which you bring requests to the City, he thinks is important. He noted in his (Mr. Chick’s)
testimony to the Historic District Commission that he had bought the sign before he was aware
of what the guidelines were and that he was intent to put a sign out front saying that “Dover is
bad for business.” He thinks that those are notable statements. Some of these things are
sometimes a challenge to move forward but he thinks that the manner in which you move
forward with them is also important and sets an important statement. Have you explored the
financial cost to front light the sign versus back light the sign? Responding to Mr. Holden, Mr.
Chick stated no he hasn’t and frankly he is not interested in front lighting the sign because it just
would look right with the little lights going over it. He is not sure exactly what he will do if this
Commission rejects it and then City Council rejects it and then he has to go to court and it’s shut
down. He is not sure what he will do at that point.
6
Page 9
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
Mr. Holden further questioned if Mr. Chick was exploring permitting pathways to place the
“Dover is bad for business” sign in front of the business? Responding to Mr. Holden, Mr. Chick
stated that he doesn’t think that he needs a permit to do that.
Ms. Maucher moved to approve HI-17-03 Sign Permit #17-1484: Wall Sign at 115 West
Loockerman Street to include back lighting of the sign, seconded by Mr. Roach and the motion
carried 7-1 by roll call vote with Dr. Jones absent. Mr. Holden voting yes; he thinks that they
need to be cognizant to allow pathways that may differ from some of our historical preferences
and that having viable businesses Downtown is important to us. Mr. Roach voting yes; being a
person in Dover that frequents Downtown he knows hundreds of people that say that they would
love to see a vape lounge in the Downtown Dover area. He also agrees that the signage looks
very conducive with the nature of the Downtown Dover District. He also agrees that turning
around situations pertaining to backlighting and signage is a major issue but he feels as though
the preservation of things that we don’t have in the area is more important than technicalities at
certain times. He does agree with Mr. Holden that sometimes you have to be a little more
careful. He understands being a business owner but at the same time, they have steps. He loves
the signage and Mr. Chick is right. He rode down Loockerman Street today and he did not even
see the business. Ms. Edwards voting yes; based on the fact that there are already existing
businesses in Downtown Dover, especially Irish Mike’s two doors down, that already have lit
signage. Mr. Holt voting yes; other signs are near him and he thinks that the business end of it is
very important for Downtown Dover. Mr. Baldwin voting yes; for the reasons stated. It is an
improvement; however, he does think that we should be aware of the number of illumens that
will be coming from this sign so that it doesn’t stand out over and above the other existing signs.
Mrs. Welsh voting yes; she does have reservations and she is in agreement with some of the
comments from Mr. Holden regarding the pro-activeness that she sees in the minutes as far as
not there not being an attempt to find out what sign could be put up before ordering the sign. But
she does understand that there is a business aspect and there are other signs like this one
existing in the Downtown. Ms. Maucher voting yes; for the reasons previously stated. It’s a
changing Downtown and it needs to be kept current and people look for that. She finds it far less
offensive than some of the neon lights that she sees in the store windows when she goes by. Mr.
Tolbert voting no; the area is the historic area of Dover and the historic area of any city is very
important for financial reasons and other reasons. It’s a major attraction for the City. It brings
in a number of visitors into the City. It enhances the appeal of the City. When you start to
compromise your Historic District with all of the new technology, it loses its attractiveness. He
hates to see Dover lose its attractiveness at this time. We are moving right ahead with new
businesses all the time and he doesn’t like to see us go backwards.
NEW APPLICATIONS
1) MI-17-07 Request for Street Name Change: Krisko Circle to Energy Lane– Review for
Recommendation of a Request for a Street Name Change for the remaining segment of
Krisko Circle which runs in a west-east direction from Stover Boulevard just east of Bay
Road. The new street name proposed is Energy Lane. The request was filed in accordance
with Dover Code of Ordinances, Chapter 98, Article II, Section 98-45 Street name change
procedure which also references Appendix A: Land Subdivision Regulations, Article VI,
7
Page 10
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
Section A. Streets. The name change procedure requires review and comments by the
Development Advisory Committee (DAC) and review by the Planning Commission prior to
public hearing and consideration by the City Council.
Representatives: Mr. Garth Jones, Chesapeake Utilities
Mrs. Melson-Williams stated that this is a request for a street name change. The provisions for
how that process works are actually laid out in the main part of Dover Code in Chapter 98. As
part of that process, any requests for name change is referred first to the Development Advisory
Committee for comments from the various agencies that participate in that process and then it is
forwarded to the Planning Commission for review and recommendation. There is not a
requirement for a public hearing in front of the Planning Commission. The public hearing comes
later once this request proceeds to the City Council level. This evening we are talking about what
is the remaining segment of Krisko Circle. It is a road segment that runs east to west from Stover
Boulevard. It is part of what is now known as the North Gate Center. The project area of Stover
Boulevard and Krisko Circle was originally part of the Stover Professional Campus. It was an
industrial park that was laid out a number of years ago with a series of twelve lots for
development. The hotel was constructed and there were some concepts for other development in
the park; however, what has transpired most recently was first the abandonment of the southern
half of Krisko Circle and the consolidation of a series of lots there which has led to the current
construction of the Chesapeake Utilities/Eastern Shore Natural Gas headquarters and warehouse
location. That was the subject of a Site Plan approval that came before this body back in 2016.
With that consolidation of properties, Krisko Circle is no longer a circle and the road segment
ends in a cul-de-sac. The applicant has requested the name change to something that is maybe a
little more appropriate given the current condition of the road that is no longer a circle. They are
proposing the street name of Energy Lane. It does follow the guidelines for naming of streets in
that short curving roads are either lanes or circles; so a lane makes sense from that perspective.
Planning Staff is recommending approval of the name Energy Lane. The comments from the
various DAC agencies (the Public Works Office, the Fire Marshal’s Office, DelDOT and the
Kent Conservation District) are indicating no objection to this request for name change. As
mentioned, the Planning Commission is a recommending body. This has to move forward to the
City’s Utility Committee and onto City Council.
Mr. Holden abstained from discussion and voting on this application as the applicant is his
employer.
Mr. Jones stated that he has read through the DAC Report and there are no comments and they
have no objections.
Mr. Holt stated that he can see where Eastern Shore Natural Gas is a big energy source so he can
see why they want to change the name to Energy Lane from Krisko Circle.
Mr. Holt moved to recommend approval to City Council for MI-17-07 Street Name Change from
Krisko Circle to Energy Lane, seconded by Ms. Edwards and the motion was carried 7-0 with
Mr. Holden abstained and Dr. Jones absent. Mr. Roach voting yes; we can’t go around calling
streets circles when it’s not. Ms. Edwards voting yes. Mr. Hold voting yes; he thinks that it’s a
8
Page 11
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
very appropriate name change. Mr. Baldwin voting yes; for the reasons stated. Mrs. Welsh
voting yes; for the reasons previously stated. Ms. Maucher voting yes; the applicant has followed
the required methodology to change a street name and it’s a fine fit. Mr. Tolbert voting yes; for
the reasons previously stated.
2) S-17-25 Development of 219-229 Beiser Boulevard: Lots 2A and 3 at Enterprise Business
Park – Public Hearing and Review of a Site Development Plan outlining four phases of
construction for parking lot areas and two (2) 19,304 S.F. two-story office building along
with the associated site improvements on two separate parcels adjoining one another. The
properties are zoned IPM (Industrial Park Manufacturing Zone). The adjoining properties are
located on the northwest side of Beiser Boulevard and are part of the Enterprise Business
Park, a planned industrial park. The owner of record is Del-Homes Catalog Group, LLC.
Property Addresses: Lot 2A is addressed as 219 Beiser Boulevard and Lot 3 is addressed as
229 Beiser Boulevard. Lot 2A Tax Parcel: ED05-076.11-01-46.00-000. Lot 3 Tax Parcel:
ED05-076.15-01-03.08-000. Council District 1. The project location was previously the
subject of Minor Subdivision Plan SB-12-02 recorded in December 2012 creating the two
lots; and also Site Plan S-07-23 Office Buildings at Enterprise Business Park which has
expired.
Representatives: Mr. Conny Malmberg, Young & Malmberg, PA
Mr. Swierczek stated that this is a Site Development Plan to permit the construction of two
19,304 SF office buildings on two adjoining sites; Lots 2A and 3 within the Enterprise Business
Park. The two sites are addressed as 219 and 229 Beiser Boulevard and both are zoned IPM
(Industrial Park and Manufacturing Zone) with the Planned Industrial Park Option. There are two
previous applications for this site. One dating to 2007 which is pretty much the same proposal
but when the two sites were previously joined. There was also an application from 2012; a Minor
Subdivision Plan for a lot in the Enterprise Business Park creating Lots 2A and 3 as we see them
now. The proposal before the Commission today is a four-phased construction process including
two identical office buildings and accompanying parking lot areas. Phase 1 is planned to be the
parking lot of Lot 3 which is the southern site with Phase 2 being its office building. Phase 3
would be the parking lot for Lot 2A on the northern side followed by Phase 4 which is to be the
office building for Lot 2A. Both parcels of land are located along the western/northern edges of
Beiser Boulevard within the Business Park.
Under the parking requirements for the IPM (Industrial Park and Manufacturing Zone) any office
building is required to have one parking space for every 800 SF of office space. Whereas any
medical office usage is required to have one parking space for every 300 SF of space. The Code
also sets a maximum limit for parking spaces at 125%. There was some issue early on with the
applicants that there may have been too many parking spaces on the plans but in further
discussions with the applicant, they have indicated that the plans for Lot 2A are intended to
contain 50% medical offices and 50% office space. Lot 3 plans to contain 100% medical office
spaces. This would put the parking lot scheme as we see now in compliance with Code. There is
also a requirement for parking spaces for bicycles. That will need to be calculated and added to
future plans by the applicants.
9
Page 12
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
In terms of access, there is an unnamed access drive already along the northern property line
(towards the left of the screen) that’s connecting to the adjacent property to the west. The plan
also shows a two-way access point from this unnamed access road at the northern edge of Lot
2A. The main access point to both Lots 2A and 3 appears to be a full movement entrance from
Beiser Boulevard. There is also an access point at the southwest corner of Lot 3 to the
neighboring site. They also indicated in the plans a five-foot-wide sidewalk along the Beiser
Boulevard frontage.
There were no building elevations provided; however, the applicants had previously commented
that they would bring them up at a future Planning Commission meeting. The Site Plan indicates
that they are well within compliance with tree planting and landscaping requirements. Other
agencies have reviewed the plans and have not voiced any significant objections or concerns.
Mr. Malmberg stated that he is principal of the owning entity of this project. The back story is
that this was an approved Subdivision Plan back in 2007. The crash came and his company
bought the property. When they bought it, it had been partially constructed and the problem is
that it was never really was finally stabilized. They really don’t know that they are going to end
up with two 20,000 SF buildings but they want to go in there and clean it up, put the parking lot
in and have it more presentable than it has been and also more environmentally sound. That is
why they presented this application in four phases. They want to keep their options open. They
have to go through some kind of process and the easiest process right now is to have the
Planning Commission bless Phase 1 and then they will be back with architecture or at least
façade elevations and any tweaking to the plans once they know a little more.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Holden moved to approve S-17-25 Development of 219-229 Beiser Boulevard: Lots 2A and 3
at Enterprise Business Park as presented as it follows City Ordinance and would be nice infill
development in a critical area of our City, seconded by Mr. Holt and the motion was carried 8-0
by roll call vote with Dr. Jones absent. Mr. Holden voting yes; for reasons previously stated. Mr.
Roach voting yes; for reasons previously stated. Ms. Edwards voting yes; for reasons previously
stated. Mr. Holt voting yes; he thinks that it is going to be a real plus for that area and will help
the site get cleaned up and moving along to have some better looking buildings in that location.
Mr. Baldwin voting yes; for the reasons previously stated. Mrs. Welsh voting yes; for the reasons
previously stated. Ms. Maucher voting yes; for reasons previously stated. Mr. Tolbert voting yes;
the area in which this project is being developed is needed there. It will fill up some empty space
and will look nice.
3) US-17-01 Capital Station Development Unified Comprehensive Sign Plan – Public
Hearing and Review of a Unified Comprehensive Sign Plan for Capital Station, a
shopping center including five (5) future buildings and a series of freestanding signs and
wall signs to identify the complex and its tenants. The property consists of 9.34 acres and
is located on the west side of DuPont Highway, north of Division Street, and south of
Maple Parkway. The property is zoned SC-1 (Neighborhood Shopping Center Zone) and
subject to the SWPOZ (Source Water Protection Overlay Zone – Tier 1: Secondary
10
Page 13
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
Wellhead Protection Area). The owner of record is Capital Station Dover LLC. Property
Address: 50 North DuPont Highway. Tax Parcel: ED05-077.06-01-02.00-000. Council
District 2. The associated Site Plan S-17-12 Revised Capital Station Dover was granted
conditional approval by the Planning Commission in June 2017.
Representatives: Mr. Jamie Sedler, DDF, Inc; Mr. Brian Finnegan, Capital Station Dover LLC
Mr. Diaz stated that this is an application for a Comprehensive Sign Plan for Capital Station.
This is a 65,000 SF shopping center proposed for North DuPont Highway. The property is zoned
SC-1 (Neighborhood Shopping Center Zone). The shopping center was conditionally approved
by the Planning Commission in June 2017. It consists of five buildings including ALDI grocery
store which is Building 5 near the intersection of North DuPont Highway and Division Street. It
also includes a restaurant which is Building 4 near the intersection of North DuPont Highway
and Maple Parkway on the northern end of the site. It includes three other buildings each of
which may potentially be a single tenant building or multi-tenant buildings. This project qualifies
for a Comprehensive Sign Plan because it will have at least three primary structures under
common management on a single property. There are two primary purposes to a Comprehensive
Sign Plan. The first is to allow for the increased signage needs of large complexes which may not
be adequately addressed by standard sign regulations. The second is to establish alternative
regulations that ensure architectural harmony between the signs as well as the buildings of the
complex and to keep the overall amount of signage from being excessive. This particular
Comprehensive Sign Plan is a bit different from ones that have been seen in the past because
they don’t know how many tenants will be in the shopping center or who most of those tenants
will be. That means that they don’t know what most of the signs will look like in the end. What
this sign plan does rather than ask for specific signs for specific tenants, is to establish rules for
where tenant signs can go. Those rules are divided into rules for placement of tenant panels on
the complex’s proposed free-standing signs and there are also rules for placement of the tenant’s
individual wall signs. For the free-standing signs, there are four main proposed free standing
signs for the property. There are two pylon signs proposed to be 150 SF each, labeled Pylons A
and B. The first pylon is at the location labeled A on the Site Plan on the DuPont Highway
frontage. The second is at the location labeled B on the plan at the intersection of DuPont
Highway and Maple Parkway. Each of these signs would be limited to a maximum of ten tenant
panels. There are limits on the variations in the number of panel sizes and the positioning of
these panels on the sign with the larger ones being required to be on top. All of these rules are
detailed on Page 2 of the Plan Book. There may be one additional fifth free-standing sign at the
intersection of DuPont Highway and Division Street that would just identify the property as a
whole as Capital Station and not include any type of (tenant) panels. Construction of this sign
would be at the applicant’s discretion.
For the wall signs, the primary rule would be that every building elevation would be limited to
having 15% of its wall area taken up by signage. This is different from the typical Sign
Regulations where each individual sign is limited to 15% of the area of the wall that it’s on.
Another important rule would be that tenants would be limited to two primary signs for frontage
and they would be allowed secondary signs that are subordinate in nature to the primary signs.
Evaluating whether the secondary signs are subordinate will be part of the Sign Permit
application process for individual tenants moving into the shopping center. The third rule is that
11
Page 14
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
the sides of the buildings would not be for individual tenants but instead would be for multiple
tenants with the owner or manager of the shopping center having some discretion over which
tenants would be allowed signage on the side elevations. These elevations would still be subject
to the 15% limitation and the two primary signs limitation. These rules are also on Page 2 of the
Plan Book. The applicants have worked pretty extensively with Planning Staff to come up with a
signage scheme that met the design guidelines for Comprehensive Sign Plans. For that reason,
Staff is recommending approval of the Comprehensive Sign Plan. There were some comments
from the Public Works Department through DAC on the placement of these signs relative to
underground utilities on the site. That is for the signs to not be within ten feet of any
underground utilities. For that reason, they are also recommending that the Commission approve
the applicant’s request to reduce the required setback for the pylon signs along North DuPont
Highway from the typically required thirty-one feet to not less than 15 feet with the exact setback
for the pylon signs to be determined as the plan moves forward and the utility locations are more
closely defined.
Mr. Holt stated that it looks like they are kind of jumping the gun on the signage for this property
since it hasn’t really been developed yet. Once they get it developed maybe the different business
entities in the property would want different types of signs than what’s proposed here.
Responding to Mr. Holt, Mr. Diaz stated that their discussions with the applicants really took
into account the fact that they don’t know what’s going in here and they don’t know what kind of
signs the tenants will ultimately want. That’s why they want to establish a set of rules as he
previously described that will govern the placement and number of these signs. There are
flexible rules so certainly the tenants when they come in will have a lot of options as to what size
signs they will have and what the placement will be. Some of them may also have directional
signs on the ground. Those could be permitted under this Comprehensive Sign Plan. But at the
same time, it will keep the overall amount of signage in the center to a reasonable amount
through the wide area of limitations which are more strict than what is typically allowed by
Code.
Mr. Roach questioned if page number 17 was confirmed? Responding to Mr. Roach, Mr.
Finnigan stated that it is not official yet. He spoke to the national tenant who was okay in
providing this information to the City of Dover. The City asked for the architectural elevations to
be part of the package going forward. They didn’t get in trouble with it but it was a little off-
setting to ALDI when they saw their name before they had signed the lease. He checked with
Red Robin on this one and they are on the one yard line with them. As part of that, he put their
architecture in here also because as a stipulation of their last time they were in front of the
Planning Commission, they wanted to see their architecture again. This is the standard
architecture that they will come in for when it comes time for them to go forth. With all the
signage that comes with the site, they also have to come in and go back through for the sign
permitting as well. He wants to thank the Planning Commission. Mrs. Melson-Williams’ team
was very helpful in working with them to make sure that they understood the latitude that was
given in the current Code. It helps them to work with tenants to come out to the site. They can
give them the latitude that they can work in for their signage package. A lot of these firms are
difficult to deal with because they have very strict guidelines that they want to follow to get their
branded signage up. It’s very important for them to know what their left and right limit is. This
way, at least they have a good idea of what they can offer them coming to the site so it’s very
12
Page 15
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
helpful in the planning process for them.
Mr. Finnigan stated that they went through the Staff notes that were provided and they are
absolutely willing to work with Staff going forward.
Mr. Tolbert stated that when a motion is made, it needs to include that the applicant cooperates
with Staff.
Mr. Finnigan stated that he would like the motion to also state that the architecture for that
Building 4 was taken under consideration per their previous visit. He doesn’t know if that is
appropriate to be tacked on to something like this but it would save us from coming back
together again. If anyone has any commentary towards that architecture they could speak to it
now and maybe kill two birds with one stone.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Roach stated that he wanted to say that he appreciates the applicant given so many different
examples in regards to different signage around Dover. It kind of goes along with the overall feel
and gives an accurate depiction in regards to how you may be planning on doing it as the
examples were taken from existing structures. He appreciates the thoroughness and detail in
regards to this packet. It gave him a very clear idea of what they are going for.
Mr. Holden stated that relative to Building 4 and the provided architecture for Red Robin, is that
an item that is up for our review and approval this evening in addition to the Comprehensive
Signage Plan? Responding to Mr. Holden, Mrs. Melson-Williams stated that it is presented in the
packet. Typically, the architecture would probably come back more specifically. She doesn’t
think that Staff looked at it that closely for architecture. They were more concerned about their
opportunities for signage around that building because all four sides are very visible. The process
for bringing the architecture back to the Commission is fairly easy. It would be considered an
item of Old Business and it’s not subject to the hearing process. They could certainly easily
accommodate a future presentation specific to that once the tenant is formerly nailed down for
the site at Building 4. It really wasn’t presented to our DAC members that it also had the
architecture for the building. They didn’t know what it was going to look like before. She thinks
that it’s easy enough to come back before the Commission when they are ready for that. They are
moving through the Site Development Plan Check Print review process for the entire site so she
thinks that timingwise they are not at a crunch time yet. She thinks that it is certainly something
that could be “thank you for presenting it to us this evening but we look forward to the more
formal submission of it in the future.”
Mr. Tolbert asked what affect that would have on the motion tonight? Can they approve it with
that condition? Responding to Mr. Tolbert, Mrs. Melson-Williams stated that the Commission
can certainly make refence to the architecture for Building 4 in the motion noting that it was
included in this Comprehensive Sign Plan as an informational piece. But they could express that
they still want to see it in the future to confirm the tenant since they haven’t signed on the dotted
line. You would not have to defer the Comprehensive Sign Plan because that’s what it is here
13
Page 16
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2017
tonight. It establishes a sign package or rules for how signage would be placed on the building;
whether it’s the tenant that is potentially shown here or a future tenant.
Mr. Holt questioned what the story was on the old water tower? Is that going to remain or will it
be coming down? Responding to Mr. Holt, Mr. Finnigan stated that the water tower would be
coming down shortly. They have a company out of Michigan that comes to take the tower over a
two-day period. That is all that the company does; they travel around the country removing
towers like this. They are actually going to cut it into sections and lower them. He thinks that
right now they are working with the public safety people from the City of Dover. They wanted to
do that work off of theirs and having all of those people on top of that tank in the dark was a
concern of the applicant. He thinks that they are trying to make sure that DelDOT and everybody
is on the same sheet of paper with that. They are going to be removing that tower.
Ms. Maucher stated that because the building architecture was not publicly noticed to be
consideration tonight would it even be appropriate to include it? Responding to Ms. Maucher,
Mr. Diaz stated that the architecture for this building would be coming back as an item of old
business relative to the original approval of the Site Development Plan which was approved in
June 2017 together with the architecture for all of the rest of the buildings. Because it was being
covered as an item of Old Business he believes that it would not require a public hearing.
Mr. Holden moved to approve US-17-01 Capital Station Development Unified Comprehensive
Sign Plan as submitted requiring that the applicant continue to work with Staff and follow Staff
and DAC comments, seconded by Mr. Holt and the motion as carried 8-0 by roll call vote with
Dr. Jones absent. Mr. Holden voting yes; supporting that a signage plan complies with our
Signage Ordinance and will support the redevelopment of a critical parcel in the City. Mr.
Roach voting yes; he thinks the signage will look very nice in an area that definitely needs to be
handled and hopefully we punch that ball in on the one yard line. Ms. Edwards voting yes; the
presentation tonight was very well done and it’s esthetically coordinated and she likes the idea
that there is some flexibility built in for the future tenants. Mr. Holt voting yes; he thinks that it’s
a real plus for the area and it’s long been needed and he is anxious to see the whole thing get
along with it. He thinks the sign plan is a good way to go. Mr. Baldwin voting yes. Mrs. Welsh
voting yes; the plan is very professionally presented and well thought out. Ms. Maucher voting
yes; based on reasons previously stated as well as the added flexibility to the future tenants. Mr.
Tolbert voting yes; the applicant has the willingness to work cooperatively with Staff and adhere
to the DAC comments and concerns. The project itself will be an asset to the City of Dover.
Meeting adjourned at 8:26 PM.
Sincerely,
Kristen Mullaney
Secretary
14
Page 17
City of Dover
DATA SHEET FOR CONDITIONAL USE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF NOVEMBER 8, 2017
PLANNING COMMISSION MEETING OF NOVEMBER 20, 2017
Plan Title: Loockerman Coffee Shop at 14 Loockerman Plaza, C-17-03
Plan Type: Conditional Use Review
Property Location: South side of Loockerman Plaza, east of South State street
Property Address: 14 Loockerman Plaza
Owner: The New Parsonage, LLC
Applicant (Lessee): Kristin Stonesifer
Tax Parcels: ED-05-077.09-05-01.00-000 and ED-05-077.09-05-01.01-000
Present Zoning: RGO (General Residence and Office Zone)
H (Historic district Zone)
Site Area: 0.129 ac. +/-
Present Use: Vacant (previous: office building)
Proposed Use: Restaurant (Coffee shop)
Building Area: 820 S.F.
Off Street Parking: Required – 0 spaces
Existing – 0 spaces
Sewer & Water: City of Dover
Waivers Requested: none
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 18
City of
Dover
CITY OF DOVER DEVELOPMENT ADVISORY Planning
Office
COMMITTEE APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: November 8, 2017
APPLICATION: Loockerman Coffee Shop at 14 Loockerman Plaza: Conditional Use
FILE #: C-17-05 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Julian Swierczek, Planner I PHONE #: (302) 736-4442
I. PLAN SUMMARY:
This is an Application for Conditional Use Review to permit conversion of an existing 820 SF
1 1/2-story structure into restaurant (coffee shop) use. The site in question consists of two (2)
parcels which, combined, consist of 15,191.66 SF +/- or (0.139 acres). The property is zoned
RGO (General Residence and Office Zone) and is subject to the H (Historic District Zone). The
property is located on the south side of Loockerman Plaza and east of South State Street. The
owner of record is the New Parsonage, LLC and the lessee is Kristin Stonesifer. Property
Address: 14 Loockerman Plaza. Tax Parcels: ED-05-077.09-05-01.00-000 and ED-05-077.09-
05-01.01-000. Council District 4.
II. PROJECT DESCRIPTION
The project proposes the conversion of the existing structure from office space to a restaurant
(coffee shop). According to the Zoning Ordinance, “restaurants” are an acceptable Conditional
Use in a RG-O Zone when the property is located in the Historic District Zone, as stipulated in
Zoning Ordinance, Article 3, Section 9.14 (b).
III. ZONING REVIEW
RG-O Zoning District: The property is zoned RG-O (General Residence and Office Zone) which
includes an allowance for restaurant use, meaning the intended conversion is allowed to be
considered through the Conditional Use process (Article 3, Section 9.14 (b)). The property is
also subject to the H (Historic District Zone).
Historic District Zone
The parcels involved with this application are within the H (Historic District Zone). The Zoning
Ordinance details the requirements of the Historic District Zone in Article 3, Section 21 and its
subsections. The purpose of the Historic District Zone regulation is to preserve and enhance the
unique character and value of the old portion of Dover as an area of special charm and interest. It
is particularly intended that the regulations prevent, in the historic district, any change of
conditions that would be deemed to be a disfigurement or degradation of the present unique
visual and architectural qualities of the district. To this end, more stringent standards are applied
Page 19
C-17-05 Loockerman Coffee Shop at 14 Loockerman Plaza
DAC Report for November 8, 2017
Page 3 of 7
to development taking place in this zone.
The Zoning Ordinance notes that an Architectural Review Certificate shall be required for the
demolition, construction, reconstruction, alteration or restoration of any new or existing structure
or where general exterior repairs are made within the historic, as provided in Article 10, Section
3 of this ordinance. No alterations to building architecture proposed except for maybe fresh
paint. A new patio and new landscape plantings are also proposed. The Architectural Review
Certification for the new outside patio can be reviewed by Staff through the Building Permit
application process for its construction.
Conditional Use Review
With Conditional Use Applications, the Planning Commission reviews the proposed project to
determine whether or not the intended use is appropriate in type and scale for the immediate
neighborhood. The Commission must also consider whether or not the proposed use will have an
adverse impact on the future orderly development of the surrounding area. The following
sections of the Zoning Ordinance which relate to the role of the Commission in reviewing
Conditional Use applications are particularly relevant when reviewing this application:
ARTICLE 10. PLANNING COMMISSION
Section 1. - Approval of conditional uses.
On application and after public notice and hearing, the commission may authorize
the issuance by the city planner of permits for any of the conditional uses for which this ordinance
requires, in the district in which such use is proposed to be located. In approving any such use, the
planning commission shall take into consideration the public health, safety and welfare, the comfort and
convenience of the public in general and of the residents of the immediate neighborhood in particular,
and may prescribe appropriate conditions and safeguards as may be required in order that the results of
its action may, to the maximum extent possible, further the expressed intent of this ordinance and the
accomplishment of the following objectives in particular:
1.1 Accessibility for emergency response. That all proposed structures, equipment or
material shall be readily accessible for fire, ambulance, police, and other emergency response;
1.2 Harmony of location, size and character. That the proposed use shall be of such location,
size and character that, in general, it will be in harmony with the appropriate and orderly
development of the zone in which it is proposed to be situated and will not be detrimental to the
orderly development of adjacent properties in accordance with the zoning classification of such
properties;
1.3 Residential zones. That, in addition to the above, in the case of any use located in, or
adjacent to, a residential zone:
1.31 The location and size of such use, the nature and intensity of operations
involved in or conducted in connection therewith, its site layout and its relation to
access streets shall be such that both pedestrian and vehicular traffic to and from
the use and the assembly of persons in connection therewith will not be hazardous
or inconvenient to, or incongruous with, the said residential district or conflict with
the normal traffic of the neighborhood; and
1.32 The location and height of buildings, the location, nature and height of walls
and fences, the nature and extent of landscaping, and other improvements on the
Page 20
C-17-05 Loockerman Coffee Shop at 14 Loockerman Plaza
DAC Report for November 8, 2017
Page 4 of 7
site shall be such that the use will not hinder or discourage the appropriate
development and use of adjacent land and buildings.
If the Planning Commission approves a Conditional Use, the use is granted as a Conditional
Use Permit. Such permits may be permanent, subject to limitations outlined in Zoning
Ordinance, Article 10 §1.41, or be required by the Commission to undergo periodic renewal,
using the procedure described in Article 10 §1.42. Any Conditional Use Permit, permanent or
not, may be revoked using the procedure described in Article 10 §1.43 if the conditions
prescribed by the Commission in conjunction with the issuance of the Conditional Use Permit
have not been, or are no longer being complied with.
IV. BUILDING ARCHITECTURE
The project photographs provided show the existing building architecture and the applicant has
confirmed that there will be no major alterations to the building’s appearance. The 1 1/2-story
frame portion of the building is covered in a light colored horizontal siding for the eastern
portion of the façade, and in red brick for the western portion of the building’s north elevation.
There is a shingle roof and two (2) windows on the east side of the main door along with a pent
roof-overhang. The western portion further contains two windows on the first floor, a dormer
window at the second floor level. The windows at the front further contain decorative shutters.
The applicant shows a proposed new planting scheme of small scale shrubs and a new brick
patio providing direct access to the main door.
V. PARKING SUMMARY
The Planning Office has determined the nature of the proposed use as the Loockerman Coffee
Shop to be similar to a retail use, as the applicant has indicated that there will be very little
seating and no wait staff. Under Article 3, Section 9, a retail spaces being established through
the Conditional Use process in the Historic District Zone does not require off-street parking.
The Zoning Ordinance requires that restaurants provide parking based on seat count. The
existing site conditions limit the ability to proposed construction of any off-street parking at this
location. The general area includes on-street parking spaces (two-hour parking and permit
parking) and other managed and municipal parking lots within walking distance of the location.
There is an established sidewalk network for the blocks surrounding the location.
SITE CONSIDERATIONS
Access
There is no vehicular access to this site, nor is there any available space to create one. There
will be pedestrian only access via a new pervious foot path leading to the building from the
Loockerman Plaza frontage sidewalk.
Sidewalks
The Zoning Ordinance, Article 5, Section 18 requires sidewalks to be installed along the public
street frontages of a property. The site has an existing sidewalk approximately nine (9) feet
wide along the frontage of Loockerman Plaza. The applicant has indicated in their application
that they will build a new pervious footpath from Loockerman Plaza to the main entrance of the
Page 21
C-17-05 Loockerman Coffee Shop at 14 Loockerman Plaza
DAC Report for November 8, 2017
Page 5 of 7
coffee shop. They have also stated they will build a new pervious patio area along the front of
the eastern portion of the building in question for future seating. The applicant has further
indicated their intent to construct a new fence to separate the patio area from the public
sidewalk and has expressed their willingness to work with the Planning Office to ensure that the
fence would satisfy the City’s requirements for construction in the Historic District.
VI. TREE PLANTING AND LANDSCAPE PLAN
The tree planting requirements are based on the project property or the project’s development
area. Article 5, Section 16.62 states that “[a] lot shall attain or exceed a tree density of one tree
per 3,000 square feet of lot area or fraction thereof.” The site appears to contain four (4) fully
grown trees on the involved parcels of +/- 15,199.66 SF. A site of this size would require six (6)
trees, meaning this would make this site overall non-compliant. Article 5, Section 16.2 offers
the option of the applicant defining a development area within the overall site for the purposed
of tree planting calculations. If the applicant makes the proposed development area from a line
along the western edge of the coffee shop straight to Loockerman Plaza, east, then the newly
defined “development site are would be approximately 3,343 SF, bringing the current number
of trees in that same area of two, compliant with code requirments.
VII. CITY AND STATE CODE REQUIREMENTS
The subject proposal has been reviewed for code compliance, plan conformity, and
completeness in accordance with this agency’s authority and area of expertise. The following
items have been identified as elements which need to be addressed by the applicant:
1) The Final Plan must include considerations and specifications for Historic District Zone (H)
requirements. Also list Historic District Zone as part of the zoning of the property.
2) The Final Plan must include notes indicating the action taken by the Planning Commission
listing any conditions of approval for the Conditional Use. The plan must be revised to
reflect all changes recommended by the Planning Commission.
3) The Final Plan must include a plan sheet with a specific “Development Area” designated
within the overall parcels. The designation of a “Development Area” will be utilized to
calculate the tree planting requirements. Identifying the existing trees in the Development
Area will likely satisfy the tree planting requirement
VIII. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO
MEET CODE OBJECTIVES
In accordance with the Zoning Ordinance, Article 10 §1, the Planning Commission in
considering and acting upon Conditional Use Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
Page 22
C-17-05 Loockerman Coffee Shop at 14 Loockerman Plaza
DAC Report for November 8, 2017
Page 6 of 7
in subsections 1.1 to 1.3.
1) Staff recommends, pursuant to Article 10, Section 1.2 on “Harmony of location, size and
character,” that it would be beneficial to the surrounding community if the applicant were
to provide bicycle rack facilities along the sidewalk on the Loockerman Plaza frontage or
on the property. The Planning Office recommends that the applicant install a bicycle rack
accommodating at least two bicycle parking spaces as a condition of approval. There is
no bicycle rack provided on the south side of the block in which the site is located. The
applicant has indicated that they are happy to work with the Planning Office on creating
an aesthetically pleasing bike rack for the site.
IX. ADVISORY COMMENTS TO THE APPLICANT:
1) In the event, that major changes and revisions to the plan occur in its finalization,
contact the Planning Office. Examples include relocation of site components, and
increases in floor area. These changes may require resubmittal for review by the
Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations in regards to the plan.
2) In the event, that there are changes to the architecture, building footprints, layout or
square footage of the buildings contact the Planning Office. These changes may require
review by the Planning Commission.
3) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
4) Following Planning Commission approval of the Conditional Use Plan, the Plan must be
revised to meet all conditions of approval from the Development Advisory Committee or
as otherwise noted.
5) For new uses in an existing building, the requirements of the building code and the fire
code must be complied with. Consult with the Chief Building Inspector and City of
Dover Fire Marshal for these requirements. The resolution of these items may impact the
site design including such items as building dimensions and height, building openings,
and fire protection needs, etc.
6) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate Plan approvals, site inspections and permits are required.
7) The applicant shall be aware that Conditional Use approval does not represent a
Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 23
C-17-05 Loockerman Coffee Shop at 14 Loockerman Plaza
DAC Report for November 8, 2017
Page 7 of 7
Page 24
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOVEMBER 1, 2017
APPLICATION: Loockerman Coffee Shop at 14 Loockerman Plaza
FILE #: C-17-05
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: ELECTRIC - 302-736-7072 PUBLIC WORKS – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Owner is responsible for locating all water, sewer, and storm sewer lines.
2. Owner is responsible for site and/or street lighting.
3. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
4. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
5. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
6. All Engineering and design for Dover Electric will be engineered upon receipt of final approved plans. All Engineering
work will be furnished by the City’s Electric Engineering Department.
WATER
1. Our office has no objection to the conditional use proposed for the subject property.
2. Due to the fact that this property is changing uses, water usage projections (peak demand or plumbing fixtures) must
be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for
the building. These projections must be submitted prior to approval so the meter size can be placed on the final site
plan, if an upgrade is required. The proposed water meter must be installed in a pit per City of Dover requirements
and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
WASTEWATER
1. Our office has no objection to the conditional use proposed for the subject property.
2. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings)
showing that velocity and all other requirements are met. All proposed wastewater utility components must meet the
requirements of the Public Utilities Water Wastewater Handbook, effective date March 22, 2010. Please contact our
office for more information.
Page 25
Loockerman Coffee Shop at 14 Loockerman Plaza
File #: C-17-05
November 1, 2017
Page 2 of 3
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office. If a plan is not required by KCD, the City of Dover will
require a Stormwater/Erosion and Sediment Control Plan.
SANITATION/GROUNDS
1. None
STREETS
1. Final site plan approval will not be granted until a copy of the approved plan, signed by DelDOT is submitted to our
office.
GENERAL
1. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format) and Adobe
Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
STREETS / WATER / WASTEWATER / STORMWATER / GROUNDS / GENERAL
1. None
SANITATION
1. This site is currently being serviced by the City of Dover. If a change to the service is required, please contact our
office to discuss options.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. Water impact fees may be associated with this project.
2. This lot shall be served by a single water service line, which shall be furnished and installed by the property owner. In
the event a property contains multiple principal structures, the property shall be served by a single water main where
a water service line may be provided to each principle structure. Each structure, which is capable of being offered for
sale, shall have its own separate water facilities.
WASTEWATER
1. Wastewater impact fees may be associated with this project.
2. This lot shall be served by a single sanitary sewer lateral, which shall be furnished and installed by the property
owner. In the event a property contains multiple principal structures, the property shall be served by a single sanitary
sewer main where a sanitary sewer lateral may be provided to each principle structure. Each structure, which is
capable of being offered for sale, shall have its own separate wastewater facilities.
STORMWATER/SANITATION/STREETS/GROUNDS/GENERAL
1. None
GENERAL
Page 26
Loockerman Coffee Shop at 14 Loockerman Plaza
File #: C-17-05
November 1, 2017
Page 3 of 3
1. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 27
C F
C-17-05 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: November 1, 2017 D S
O H
V A
E L
R
APPLICATION: 14 Loockerman Plaza; Loockerman Coffee Shop
FILE #: C-17-05 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Matthew Brown, Deputy Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is Restaurant (Coffee House).
2. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms. Dimensions of bollards. Bollards shall be a minimum of six-inch
diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36
inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The
bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any
deviation of the stated requirements must be approved by the fire marshal and/or chief building
inspector. The above dimensions shall serve as the requirement for installation; however, the fire
marshal and/or chief building inspector shall have the authority to require more stringent
dimensions to fit the needs of devices warranting impact protection. Color of bollards. Bollards
should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or
have a reflective coating. Any deviation of the stated requirements must be approved by the fire
marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)
3. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following: One-family and two-family residential structures, height, the number shall measure a
minimum of four inches in height, location, the number shall be placed on the house above or to
the left or right of the front entrance, color, the number shall be contrasting to the background
color, Arabic numerals, all numbers shall be Arabic numerals. Multiple-family dwellings, measurements,
Page 28
the number shall measure a minimum of six inches when identifying individual apartments with
exterior doors, and 12 inches when identifying buildings with apartment complexes where there
are two or more buildings not assigned street addresses. Individual buildings with street
addresses shall have numbers measuring six inches, location, numbers shall be placed either in the
center of the building or on the street end of the building so as to be visible from either the public
or private street or from the parking lot, color, numbers shall be contrasting to the background
color, Arabic numerals, all numbers used shall be Arabic numerals. Commercial, industrial and office
buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, property line or
driveway, should the building be located far enough from a public or private road so that the
numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building, color; each building, numbers shall
be contrasting to the background color and shall be placed on each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals, Shopping centers. Shopping centers
consisting of two or more stores shall have a tenant or suite number affixed to the front of the
tenant space and on the outside of the rear door which corresponds with that tenant space.
Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)
4. All required means of egress shall have an exit discharge consisting of a non-slip surface, and
leading to and terminating at a public way.
5. Project to be completed per approved Site Plan.
6. Full building and fire plan review is required.
7. Construction or renovations cannot be started until building plans are approved.
8. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire marshal’s Office. This work cannot be started until the permit is approved.
9. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Construction of wall will require a permit.
2. Proposed use is Business to Business.
3. No grease laden vapors shall be produced. If so addition requirements will apply.
4. Future Tenants of the building may require separation and additional requirements.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 29
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: November 1, 2017 T
===============================================================
APPLICATION: Loockerman Coffee Shop at 14 Loockerman Plaza
FILE#: C-17-05 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no objection to the proposed Coffee Shop.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 30
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
November 2017
APPLICATION: Loockerman Coffee Shop at 14 Loockerman Plaza
FILE #: C-17- 05
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Jessica L. Verchick, EIT PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE
FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE
APPLICANT:
Source: 2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. The Kent Conservation District has no objection to the conditional use approval of the above referenced
site.
ADVISORY COMMENTS TO THE APPLICANT:
1. If at any time expansion or earth disturbing activity (clearing, grubbing tree clearing etc.) takes place and
exceeds 5000 square feet; a detailed Sediment and Stormwater Management Plan must be submitted to,
reviewed by and approved by The Kent Conversation District.
Page 31
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF November 8, 2017
PLANNING COMMISSION MEETING OF November 20, 2017
Plan Title: College Road Multiplex at 299 College Road, S-17-28
Plan Type: Site Development Plan
Location: At the northeast corner of College Road and Conwell Street
Tax Map #: ED-05-067.00-02-26.00-000
Owner/Applicant: Enyam, LLC c/o Stephen Lumor
Site Area: 0.42 acres +/- (18,244 SF)
Zoning: RM-2 (Medium Density Residence Zone)
Prior Use: Vacant
Proposed Use: Multiplex of three (3) units
Building Footprint: 1,105 SF per unit for a total of 3,315 SF footprint
Dwelling Units: 3
Off Street Parking: Required – 6 spaces (maximum 7 by Code)
Proposed – 6 spaces
Sewer & Water: City of Dover
Waivers Elimination of bicycle parking requirement
Requested: Relaxation of pathway location requirements
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 32
City of
Dover
CITY OF DOVER
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: November 8, 2017
APPLICATION: College Road Multiplex at 299 College Road, Dover
FILE #: S-17-28 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Eddie Diaz, Planner I PHONE #: (302) 736-7196
I. PLAN SUMMARY
Review of a Site Development Plan application to permit construction of a three (3) unit
multiplex residential building (multi-family dwelling) with adjoining parking spaces. The
property consists of a 18,244 S.F. +/- parcel (0.42 +/- acres) and is zoned RM-2 (Medium
Density Residence Zone). The property is located on the northwest side of College Road and
adjacent to Conwell Street. The owner of record is Stephen E. Lumor (Enyam, LLC). Property
Address: 299 College Road. Tax Parcel: ED-05-067.00-02-26.00-000. Council District 4.
II. PROJECT DESCRIPTION
The property is located on the north side of College Road, adjacent and to the east of a right-of-
way known as Conwell Street. It is bound on the north and east by an enclave of land in Kent
County which is used as a residential area. To the west across Conwell Street from the property
is a one-family residence. To the south across College Road from the property is another section
of Conwell Street which serves the Delaware State University’s Courtyard Apartments. Other
streets in the area include Raymond Street and Mishoe Street, and other land uses in the area
include mostly one-family residences, apartments, and manufactured homes. There is also a
transitional housing complex east of the site and a cemetery southwest of it.
The Site Plan proposes three (3) residential units in a single multiplex building. It appears the
units are arranged in a townhouse-like fashion, with their fronts facing College Road. Other
proposed site improvements include a six (6) space parking lot which takes access from College
Road, a front entrance walk for each unit, rear patios, and landscaping.
On November 8, 2017, the applicant provided together with the waiver requests for this project a
“waiver request display” which shows a slightly updated version of the site plan. Differences on
this plan from the initial submission include a larger turnaround in the parking area, a DelDOT
permanent easement 15 feet in width instead of 10 feet, and a landscape buffer 15 feet in width
instead of 20 feet.
Page 33
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 2
III. ZONING REVIEW
RM-2: Medium Density Residence Zone
The property’s proposed multiplex use is permitted in the RM-2 zoning district. Based on the
number of units and the 0.42-acre size of the lot, the density of the lot is approximately
equivalent to 7.1 units per acre. This complies with the zone’s maximum of eight (8) units per
acre. However, based on the size of the lot the development is limited to three (3) dwelling units.
Multiplex
A multiplex is given the following definition within the Zoning Ordinance Article 12:
Multiplex: A detached structure containing three to five attached dwelling units, with each
unit having independent outside access and at least two exposures.
The proposed structure meets this definition of the Zoning Ordinance. A Multiplex is a type of
multi-family dwelling or multiple dwelling where the building contains more than two dwelling
units. Multiplexes are not a defined type of dwelling within the City’s Building Code or Fire
Code, and the proposed structure will have to be defined as townhouse units or apartment units
within those codes depending on the type of construction.
IV. PARKING SUMMARY
Off-street parking in the RM-2 zone must be provided for multiplexes at a rate of two (2) spaces
per unit. Based on this ratio six (6) parking spaces are required. The applicant has provided the
six required parking spaces at the front of the units.
The parking area may be considered a kind of shared-use driveway under zoning requirements. It
does not meet the definition of a parking lot specified in Zoning Ordinance Article 12, which
states that a parking lot is a parking area provided for ten or more vehicles in the open.
Based on building code requirements, one of the parking spaces may be required to be ADA-
accessible. If this is the case the parking area may need to expand to accommodate the additional
width needed by one of the spaces.
Loading Spaces
No loading spaces are required for this site.
Bicycle Parking
Bicycle parking is required at a ratio of one space for every twenty parking spaces. If the site is
to be served by 6 parking spaces, one (1) bicycle parking spaces is required. No bicycle parking
is currently shown on the plan. It should be noted that there is not a requirement for bicycle
parking spaces to be located on an impervious surface.
Waiver Request: Elimination of Bicycle Parking
In accordance with Zoning Ordinance Article 6 §3.10, the Planning Commission may waive the
requirement for bicycle parking if it is demonstrated that bicycle parking would not be
appropriate for safety reasons or due to the nature of the use of the site. A waiver request has
been submitted for consideration.
V. SITE CONSIDERATIONS
Page 34
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 3
Site Entrance and adjacent Rights-of-Way
College Road is a State-maintained road and the design of the site entrance onto it is subject to
DelDOT approval. While typically DelDOT seeks to have access taken from side streets where
possible rather than the main road corridor, in order to minimize points of access on such
corridors, it appears direct access to College Road will be approved for this site, subject to
DelDOT’s review and approval. There is a previous driveway access from College Road to this
parcel which will be removed.
A right-of-way named Conwell Street runs along the west property line of the subject parcel; it is
not currently improved to City street standards and portions of the right-of-way as it continues
north are not located within the boundaries of the City of Dover. The portion of the right-of-way
immediately adjacent to the site is not located within the City boundaries.
The drive aisle leading from the site entrance to the parking spaces is shown as 20 feet in width.
This complies with the requirements of the Zoning Ordinance for minimum aisle width outlined
in Article 6, §3.5. However, the applicant has stated that DelDOT will require the aisle to be
expanded to 24 feet in width. Fire code requirements may also impact the width of the aisle. On
the updated site plan (the “waiver request display”), the aisle is shown partially inside the
DelDOT permanent easement, which has expanded to 15 feet. The drive aisle will have to be
moved to the north so as to be outside the easement, potentially moving other site elements as
well.
Impervious Surface Coverage
The maximum impervious area for multiplex dwellings in the RM-2 Zone is 35%. For the
project’s 18,244 SF site, the maximum impervious area is 6,385 SF. At present, 6,384 SF of
impervious surface are listed on the site plan. However, the applicant has indicated that there are
sufficient requirements across the reviewing agencies that the amount of impervious surface will
need to increase. The applicant has indicated they will seek a variance from the Board of
Adjustment to increase the allowed amount of impervious surface. If this variance is not
granted, the applicant will have to revise the design of the project so that all design requirements
can be met within the 35% coverage limit.
Setbacks and Separation Requirements
The building location as proposed meets the required setbacks for multiple dwellings within the
RM-2 Zone, as outlined in Zoning Ordinance Article 4 §4.8. The project also meets the required
separation distance between multi-family dwellings and parking areas established in Zoning
Ordinance Article 6 §5.3. The required separation distance is 15 feet. This section of the Zoning
Ordinance was recently amended under Ordinance #2017-12 (approved by City Council on
October 9, 2017; MI-17-02); however, in this case the requirement would be the same both
before and after the ordinance change.
Pedestrian and Bicycle Considerations
The site is currently served by frontage sidewalk along College Road. However, this frontage
sidewalk does not appear to be built to City sidewalk standards, and there is also no sidewalk along
the Conwell Street frontage. Under the recently adopted Ordinance #2017-12, Zoning Ordinance,
Article 5 §18 was amended to include the provision that new buildings developed on sites with
Page 35
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 4
sidewalk are required to upgrade the sidewalk to the City standard. There is also the requirement
that new buildings developed on sites without sidewalk on one or more frontages are required to
provide sidewalk along the public street frontages and private street frontages; this would apply
to the Conwell Street side of the property.
There is one pedestrian route into the site from the College Road street frontage, which leads into
the parking area. Additional sidewalk on the north side of the parking lot leads into the residential
units.
The site is somewhat lacking in adjacent bicycle facilities. Immediately to the west of the site
College Road has wide paved shoulders, which taper off right in front of the site. Residents of the
site can bicycle west on these shoulders as far as College Park Drive. To the east on College Road
there are bike lanes which tie into the City’s wider bicycle network via North DuPont Highway.
These bike lanes start about 300 feet to the east of the site. This section of College Road is not
specifically addressed in the City’s 2015 Bicycle Plan or the Dover/Kent County MPO’s 2017
Regional Bike Plan, and it is not clear what site-specific improvements would improve bicycling in
the area.
Waiver Request: Relaxation of Pathway Location Requirements
In accordance with Zoning Ordinance Article 5 §18.5, the Planning Commission may waive
some or all of the pathway location requirements, including the requirement to upgrade the
frontage sidewalk and the requirement to put sidewalk along Conwell Street. The applicant’s
waiver request must demonstrate that the property is isolated from the existing pathway network,
that the proposed use would not generate additional pedestrian, bicycle, or other non-motorized
trips, or that installation of sidewalk would be impractical or impossible. The applicant has
submitted a waiver request for consideration; based on the “waiver request display” the applicant
is asking to waive the requirements for both College Road and Conwell Street.
Emergency Rear Access Requirements
Zoning Ordinance Article 5 §17(5)(a) specifies rear emergency access requirements for various
types of residential units. Multiplexes are not specifically listed here as a type of residential use
requiring emergency rear access; therefore, if the requirements of the Fire Marshal are met with
regard to fire protection, no emergency rear access will be required. The applicant has stated that
the building may have sprinklers, which would satisfy the Fire Marshal’s requirements. If
sprinklers are not provided other fire protection requirements may apply.
Lighting
No lighting is currently shown on the site. For this residential building, lighting should be sufficient
to light the site while also not being detrimental to conditions inside the units at night.
Dumpsters
The plan specifies that trash will be collected by a private hauler; however, after being told by the
City’s Public Works Department that public trash pickup was available for this site, the applicant
stated they would seek to use the City service instead. For City pickup, 90-gallon trash and
recycling cans would be used. It is not clear from the plan where the trash receptacles will be stored.
Page 36
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 5
The trash receptacles cannot be stored in either front yard (along College Road or Conwell Street)
and may need some form of screening to hide them from adjacent properties.
VI. BUILDING ARCHITECTURE
The applicant submitted an architectural template from a designer of stock buildings as
architectural information for the building. The template shows a four-unit multiplex, and the
design shown will have to be adapted to the three-unit multiplex on the plan. This adaptation will
primarily occur on the exterior of the building, as the floor plan of each unit is identical.
The multiplex is designed so that the units will appear to be a single large structure, rather than
individual townhouse-like units. A single large hipped roof covers all the units. It is not clear
from the elevation provided what the material on the exterior walls will be, but it appears to be a
kind of siding. The units may or may not have some distinction from each other based on the
color of the siding. Window boxes, small covered porches/entryways, and patios are provided for
each unit.
Only one elevation of the building is shown; it is not yet known what the rest of the elevations
will look like.
The occupancy classification of the building (townhouses or apartments) is not yet known, as
“multiplex” is not a defined building type within the Building Code. The classification does have
implications for the site design, including on emergency access and on the need for ADA
parking.
VII. RECREATION AND OPEN SPACE
Residential projects are typically required to provide Active Recreation Area under Zoning
Ordinance, Article 5 §10.1. Due to the property size and unit density, this project qualifies for an
active recreation area exemption for small developments under Zoning Ordinance, Article 5
§10.511. Article 5 §10.511 specifies that developments with less than five acres of land and less
than ten dwelling units shall be exempt from land dedication requirements, which include a
10,000 SF minimum Active Recreation Area.
However, the applicant will be required to make a cash donation to the City’s Parks and
Recreation fund in lieu of dedicating the required recreation area. The value of the donation
will be ten percent of the appraised value of the property’s gross land area.
The Parks, Recreation and Community Enhancement Committee will need to consider this Cash-
in-lieu of Recreation Area payment and the Planning Office must prepare an Active Recreation
Area Report outlining the amount of the cash donation; the appraisal information must be
provided. The next meeting of the Parks, Recreation and Community Enhancement
Committee will be on December 12, 2017. The Planning Commission must act to accept the
cash-in-lieu donation as part of any motion regarding this project, or as a separate motion if
necessary.
VIII. TREE PLANTING AND LANDSCAPE PLAN
The submitted plan set includes a concept for the Landscaping Plan. The total lot area is 18,244
Page 37
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 6
SF; based on this area, seven (7) trees are required to meet the tree density requirements of the
site. The applicant proposes to meet this requirement with seven existing trees. The existing trees
include three (3) Black Cherry trees, two (2) Black Walnut trees, one (1) Tulip Poplar tree, and
one (1) Sweet Gum tree. Five of the trees are located at the rear of the site and two are located
near the western edge of the site. It appears that the rest of the existing vegetation on the site
(mostly wild brush and shrubs) will be appropriately cleared to make way for the development.
Infill Landscaping Standards and Parking Lot Screening
Zoning Ordinance Article 5 §10.3 specifies that residential lots developed in infill areas shall
include landscaping, with plants and shrubs, along the portions of the house that front a public
street. The two trees along Conwell Street and the proposed 15-foot wide landscape buffer may
be sufficient to fulfill this requirement. However, to be sure this requirement is met more
information is needed on the type of proposed landscaping within the landscape buffer. Trees
and shrubs would be sufficient to meet the requirement while grass alone would not.
Zoning Ordinance Article 6 §5.43 also specifies that landscaping is required whenever a parking
lot is located across the street from a residential use. Specifically, a thick hedge is required
parallel to the street between the street and the parking. However, a hedge will not be required
the parking area on this property as it does not meet the definition of a parking lot specified in
Zoning Ordinance Article 12, which states that a parking lot is a parking area provided for ten or
more vehicles in the open.
IX. CITY AND STATE CODE REQUIREMENTS
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with this agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) A Record Plan sheet is required to show the dedication of a 15-foot wide permanent
easement to DelDOT along the College Road frontage. The dedication cannot be
accomplished with the Site Plan sheets.
2) The sidewalk along College Road shall be upgraded to City sidewalk standards, and sidewalk
shall be provided along the Conwell Street frontage, unless a waiver is granted by the
Planning Commission. A waiver request was submitted for review.
3) One (1) bicycle space shall be provided in accordance with the Zoning Ordinance unless a
waiver is granted by the Planning Commission. This bicycle parking space is not required to
be located on impervious surface. A waiver request was submitted for review.
4) An appraisal of the property to be utilized for determining the value of the required
cash-in-lieu donation must be submitted to the Planning Office. The Planning Office will
prepare an Active Recreation Area report for review by the Parks, Recreation, and
Community Enhancement Committee and the Planning Commission based on the
information provided.
Page 38
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 7
5) Additional information is required regarding the proposed trash collection strategy. The
storage location of the trash receptacles must be specified, and if in an outdoor location, the
method of screening the receptacles from right-of-way and adjacent properties must also be
specified.
6) Please show any proposed site lighting on the plan, including location, direction, power, and
time of use, or specify that lighting will be building-mounted only.
7) If required by the Building Code, redesign one of the six parking spaces so it is ADA van
accessible.
8) Sheet C100/Cover Sheet:
a. Under the City of Dover utility notes, please add a note specifying that all new utilities
constructed on the site shall be constructed at the expense of the developer.
9) Sheet C102/Existing Conditions and Demolition Plan:
a. Please label on this plan the area of existing vegetation to be cleared for construction.
b. Please provide lengths and bearings of the property lines of the site so that the site
boundaries may be precisely defined.
10) Sheet C106/Landscape Plan:
a. Under the Tree Density Calculations, please change the 0.42 acres of “non-woodland
area” to 0.42 acres of “development area.” This is to comply with the new method of
calculating tree density requirements established under Ordinance #2017-12, passed by
City Council on October 9, 2017. Please note that for this property the required number
of trees remains at seven under the new calculation method.
b. Please provide details on the plantings to be placed in the 15-foot wide landscape buffer
area. These plantings must be sufficient to meet the infill lot landscaping standards of
Zoning Ordinance Article 5 §10.3.
11) Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval
by the Kent Conservation District must reflect the Site Plan layout and design conditionally
approved by the Planning Commission and be in compliance with the Zoning Ordinance and
technical review requirements of other agencies.
12) Any signs are subject to a separate review and approval process in the City of Dover.
13) The Final Plan set must include notes documenting any action taken by the Planning
Commission with regard to requested waivers, and must list any additional conditions of
approval.
X. RECOMMENDED ADDITIONAL CONSIDERATIONS TO MEET CODE OBJECTIVES
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
Page 39
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 8
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Waiver Request: Elimination of Bicycle Parking Requirement: In accordance with
Zoning Ordinance, Article 10 §2.21, related to safety and convenience of vehicular,
transit, bicycle, and pedestrian traffic, Staff recommends the Commission deny the
waiver request to eliminate the bicycle parking requirement. As established in the
“Pedestrian and Bicycle Considerations” section of this Report, bicycle facilities to
access the site are somewhat deficient but still present. The applicant states that the
tenants and their visitors are anticipated to keep their bicycles inside, but the preferences
of the tenants cannot be definitively known at this time. The units lack garages that would
be the logical place to store a bicycle, as opposed to keeping them in, for instance, the
living room. If at least one tenant might prefer to store their bicycle outside, the Bicycle
Parking Requirement should be maintained.
2) Waiver Request: Relaxation of Pathway Requirements: In accordance with Zoning
Ordinance, Article 10 §2.21, related to safety and convenience of vehicular, transit,
bicycle, and pedestrian traffic, Staff recommends the Commission partially approve the
waiver request to relax pathway requirements for the site. Specifically, Staff recommends
the Commission eliminate the requirement to construct sidewalk along Conwell Street.
Staff concurs with the applicant that constructing sidewalk along this right-of-way would
result in an isolated pathway with no access benefits. In addition, the sidewalk would
likely have to be reconstructed if Conwell Street was ever updated.
The applicant did not make an argument in favor of relaxing code requirements for
College Road. The only point where it is mentioned in the waiver request is when it is
stated to be consistent with the sidewalk along the frontage of surrounding properties on
College Road. While this is true, the whole sidewalk is deficient with respect to current
City standards, and should be upgraded wherever possible. A sidewalk immediately
adjacent to the curb is more dangerous to pedestrians than one at a 5-foot wide remove. A
sidewalk separated from the street, however, is both safer and perceived to be safer,
encouraging more people to use it. This is particularly important for residential
properties.
3) Alterations to Pathway Design standards: With the passage of Ordinance #2017-12 on
October 9, 2017, the Planning Commission gained the ability to require standard City
sidewalk be upgraded to an alternative pathway type in order to improve multi-modal
access to a site. However, in accordance with Zoning Ordinance, Article 10 §2.21, related
to safety and convenience of vehicular, transit, bicycle, and pedestrian traffic, Staff
recommends the Commission not require the provision of a multi-use path or other
facility upgrades for this site. There are options for residents of the site to reach the
eastbound bike lane on College Road tying into the City’s wider bicycle network. A
multi-use path constructed across the property’s short 100-foot College Road frontage
would not tie into any other multimodal facilities, and is unlikely to be linked to in the
foreseeable future as the neighborhood is not a developing area. The area also has no
Page 40
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 9
specific recommendations related to it in the City’s 2015 Bicycle Plan or the Dover/Kent
County MPO’s 2017 Regional Bike Plan. This recommendation does not preclude DelDOT
from requiring facility upgrades.
Other agencies may recommend additional considerations to meet code objectives in accordance
with their areas of expertise. Action on all considerations identified in this section and by other
agencies is at the discretion of the Planning Commission.
XI. ADVISORY COMMENTS TO THE APPLICANT
1) The Planning Commission should act upon any waiver requests as part of any motion to
approve this Site Plan, or as a separate motion if necessary. Note: The recommendations
for these waivers are at the discretion of the Planning Commission. The Commission may
approve or deny waiver requests.
2) The applicant should be advised that getting a variance from the impervious surface
coverage requirements of the site is a separate process through the Board of Adjustment.
A separate application and separate public hearing is required. Conditional approval of
the project by the Planning Commission does not guarantee the granting of a variance.
3) In the event that major changes and revisions to the Site Development Plan occur in the
finalization of the Plan, contact the Planning Office. Examples include reorientation of
the complex/buildings, relocation of site components like stormwater management areas
and site entrances, and increases in floor area. These changes may require resubmittal for
review by the Development Advisory Committee, Planning Commission, or other
agencies and commissions making recommendations in regards to the plan.
4) In the event that there are changes to the architecture, building footprints, layout or
square footage of the buildings contact the Planning Office. These changes may require
review by the Planning Commission.
5) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
6) Following Planning Commission approval of the Site Development Plan, the Plan must
be revised to meet all conditions of approval from the Development Advisory Committee
or as otherwise noted.
7) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, parking requirements, etc.
8) The applicant/developer shall be aware that prior to any ground disturbing activities on
Page 41
S-17-28 College Road Multiplex at 299 College Road
DAC Report of November 8, 2017
Page 10
the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections
and permits are required.
9) Construction may have an effect on the adjacent property owners. Any work requiring
the closing or rerouting of residents or visitors should be coordinated as to offer the least
amount of inconvenience.
10) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or
building identification sign may require a Sign Permit from the City of Dover prior to
placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
11) The applicant shall be aware that Site Plan approval does not represent a Building Permit
and associated construction activity permits. A separate application process is required
for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 42
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOVEMBER 1, 2017
APPLICATION: Multiplex at 299 College Road
FILE #: S-17-28
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 43
Multiplex at 299 College Road
File #: S-17-28
November 1, 2017
Page 2 of 5
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
b. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7025 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Sheet C107, General Utility Note #6- All water services shall be type ‘K’ copper tubing coils for services one inch to
two inch (1” to 2”), or SDR9 (poly tubing) for services two inches (2”) or greater.
5. Water service lines shall be installed five feet (5’) to the right of the sewer lateral as viewed from the centerline of the
street.
6. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be
submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must be
installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is
required downstream of the meter.
7. Curb stops shall be installed one foot (1’) outside of the right-of-way or easement line for each lot in a non-traffic
bearing location.
8. A master water meter shall be installed outside, in a meter pit or vault, on the domestic water service, in a non-traffic
bearing location.
9. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the
building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap
and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is
recommended.
10. The Department of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The
blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange
must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve
shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the
floor to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through
walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
Page 44
Multiplex at 299 College Road
File #: S-17-28
November 1, 2017
Page 3 of 5
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other
requirements are met. Any projected future flow requirement must be clearly identified.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. Sheet C107, General Utility Note #2- All sanitary sewer pipe shall be SDR35 for depths up to twelve feet (12’) and
SDR 26 for depths from twelve feet to eighteen feet (12’ to 18’).
8. Proposed sanitary sewer laterals shall be connected directly to the existing main, not manholes, unless impracticable,
as determined by the Department of Public Works.
9. The proposed sanitary sewer services shall be contained on the lot.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office. If a plan is not required by KCD, the City of Dover will
require a Stormwater/Erosion and Sediment Control Plan.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted
to our office.
2. The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This
standard was administratively revised to meet ADA and FHA compliance with cross slope requirements and to
prevent cars from scrapping at driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five
feet (5’) wide grass strip behind the curb.
3. The City of Dover does not own Conwell Street; therefore there is no City of Dover right-of-way. Please revise on
plans.
SANITATION
1. Every person occupying a residence or duplex and every owner of an apartment shall provide such premises with a
sufficient number of solid waste containers to provide adequate capacity for the solid waste placed out for collection
without overloading the capacity of the containers.
GROUNDS
1. No street tree shall be planted closer than 30 feet to any street corner and no closer than ten feet to any fireplug.
2. Only trees listed as small to medium shall be planted under power lines; and no trees shall be planted within ten feet
of any underground water line, sewer line, transmission line or other utility.
3. It shall be unlawful and a nuisance for any person to plant any vegetation in any public right-of-way. Upon receipt of
notice from the city to remove any vegetation located in a public right-of-way, the owner of the abutting property shall
remove such vegetation at his own expense within the time limit provided in such notice.
Page 45
Multiplex at 299 College Road
File #: S-17-28
November 1, 2017
Page 4 of 5
4. It shall be unlawful and a nuisance for any person to plant any tree, shrub or bush within 16 feet of the curbline. Upon
receipt of notice from the city to remove any tree, shrub or bush which is located within 16 feet of the curbline, the
owner of the property upon which such tree, shrub or bush is located shall remove the same at his own expense
within the time limit fixed in such notice.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
3. Sheet C100
a. City of Dover Utility Note #2- The City of Dover Construction Manager contact number is 302-736-7025,
b. City of Dover Utility Note #5- Please replace the Public Utilities Department with Department of Public Works
c. City of Dover Utility Note #6- Please replace “ny” with “by”.
4. Sheet C102- Please provide the City of Dover with the referenced deed in General Note #2.
5. Sheet C108 is blank. Please revise to show utility profiles.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER
1. None.
STORMWATER
1. It is recommended to relocate the proposed sanitary sewer service away from the proposed perimeter swale.
STREETS / SANITATION / GROUNDS
1. None.
GENERAL
1. It is recommended to provide the following note for the Contractor on sheet C100: Contractor shall notify “Miss Utility”
(1-800-282-8555) at least 48 hours prior to excavation to have existing underground utilities located and marked.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1.
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking
Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan
sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the
Office of Drinking Water until review has been completed by our office.
Page 46
Multiplex at 299 College Road
File #: S-17-28
November 1, 2017
Page 5 of 5
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
4. Water impact fees may be required for this proposed site plan.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water
Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for
providing all application fees, completed forms and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm
sewer crossings must be shown on the profiles.
4. Wastewater impact fees may be required for this proposed site plan.
STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 47
C F
S-17-28 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 11/08/17 D S
O H
V A
E L
R
APPLICATION: Multiplex at 299 College Rd
FILE #: S-17-28 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Matthew Brown, Deputy Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
Routine Comments:
1. Proposed building is residential townhomes.
2. Perimeter access shall be 25% and clearly shown on the plans. Perimeter Access minimum width
shall be 15 feet measured from the face of the building at grade with a maximum slope of ten
percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall
be permitted within the perimeter access, and shall not interfere with emergency services fire
ground operations. If a physical barrier (fence, pond, steep slope, etc) prevents access, that
portion of the building perimeter shall not be included in the calculation of Percent of Perimeter
Access. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3)
3. Fire lanes shall cover 25% of the proposed building. Fire lanes are required to be 24 feet wide and
run along the front of the building as determined by the primary entrance(s). In cases where
there is more than one primary entrance(s), each shall be served by a fire lane even if this exceeds
the percentage as required. The closest edge of fire lanes shall not be located closer than ten (10)
feet to the exterior wall and the closest edge of fire lanes shall not be located further than 50 feet
from the exterior wall if one or two stories in height; 40 feet if three or four stories in height, or
30 feet if over four stories in height. (2015 Delaware State Fire Prevention Regulations, 705,
Chapter 5)
4. Where parking is located between the building and the fire lane, parking shall not be located
closer than 15 feet to the exterior wall. (2015 Delaware State Fire Prevention Regulations, 705,
Chapter 5, 6.4.1)
5. All Fire Lanes shall be marked as follows: both the inner and outer edges of the fire lane shall be
marked, where curbs are present, the top and face of the curb shall be painted yellow, where no
Page 48
curbs are present, a four inch (4”) solid yellow demarcation line shall mark the edge(s) of the fire
lane. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
6. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
7. Fire lane signs shall be located as follows: see Figure 5-16 – Approved Sign For Marking Fire
Lanes, fire lane signs shall be spaced at 150 foot intervals maximum, all fire lane signs shall be
located no less than six feet (6’) and no higher than eight feet (8’) above the pavement, signs shall
be placed at each end of the fire lane, and signs shall face all oncoming traffic. Where parking is
not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire lane
signs, and shall conform to the specifications of 7.6. (2015 Delaware State Fire Prevention
Regulations, 705, Chapter 5, 7)
8. Emergency access to rear building areas compliant with City of Dover Code (Article 5-
Supplementary Regulations, Section 17); all four stories and greater buildings require 24ft fire
lane at the rear. All two to three story apartment structures require an 18ft Secondary Fire Lane
at the rear. All townhouses (3-8 units) with no fire protection require a 16ft alley at the rear.
9. Speed Reduction Devices must be approved, please see City of Dover Ordinance 98-10 in
reference to this process.
10. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation
and as illustrated by the appropriate figures of this regulation. All fire hydrants shall have
minimum of four inch (4") solid yellow demarcation lines to define specific areas, where fire
hydrants are located along a curb line with permitted parking, the area between the fire hydrant
and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words
"NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and
extend for a distance 15 feet on both sides. Where fire hydrants are located in parking lots or
other areas susceptible to blockage by parked vehicles they shall be treated as follows: fire
hydrants shall be protected in all directions for a distance of seven feet (7') with barriers or
curbing, Minimum four inch (4") diameter steel bollards filled with concrete and marked yellow
shall be installed at the outermost corners of the fire hydrant demarcation area. The minimum
height of the bollard shall be 36 inches above the finished grade of the adjacent surface, and the
steamer connection of all fire hydrants shall be positioned so as to be facing the edge of the street,
or traffic lane. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
11. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel
under the top flange, hydrant bonnets shall be color coded based on the following criteria: class
AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 -
999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM -
painted black. (2015 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
12. Sprinkler system required. System is to be monitored by an approved Fire Alarm System. This
chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are
modified by more than 50% after the effective date of these Regulations. The 50% figure shall be
Page 49
calculated utilizing the gross square footage of the building, structure, marine vessel, premises
and conditions as to arrive at the correct application.
13. Fire Department Connection is to be a 5 inch stortz connection on a 30 degree elbow located
within 50 feet of main entrance. Fire Department Connection shall be located at the nearest
point of fire department apparatus accessibility (front of the building) or at a location approved
by the AHJ. Access to the Fire Department Connection must be clear unobstructed access as
defined by the AHJ.
14. Parking and/or obstructions shall be prohibited in front of fire department connections for a
distance measuring from the center line and extending four feet on both sides. (2015 Delaware
State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
15. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
16. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow
demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from
the center line of the connection and extend for a distance of four feet (4') on both sides, and
where parking is allow between the building and the street or fire lane the solid yellow
demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane
(Markings shall not be required on the sidewalk surface). All fire department connections
(standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT.
CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite
letters on white scotchlite background. The sign shall be clearly visible from the fire lane or
roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2015
Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover
Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire
department connections shall be not less than three feet nor more than five feet in height above
finished grade. The fire marshal shall have the authority to require more stringent
requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)
17. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms. Dimensions of bollards. Bollards shall be a minimum of six-inch
diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36
inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The
bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any
deviation of the stated requirements must be approved by the fire marshal and/or chief building
inspector. The above dimensions shall serve as the requirement for installation; however the fire
marshal and/or chief building inspector shall have the authority to require more stringent
dimensions to fit the needs of devices warranting impact protection. Color of bollards. Bollards
Page 50
should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or
have a reflective coating. Any deviation of the stated requirements must be approved by the fire
marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)
18. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following: One-family and two-family residential structures, height, the number shall measure a
minimum of four inches in height, location, the number shall be placed on the house above or to
the left or right of the front entrance, color, the number shall be contrasting to the background
color, Arabic numerals, all numbers shall be Arabic numerals. Multiple-family dwellings, measurements,
the number shall measure a minimum of six inches when identifying individual apartments with
exterior doors, and 12 inches when identifying buildings with apartment complexes where there
are two or more buildings not assigned street addresses. Individual buildings with street
addresses shall have numbers measuring six inches, location, numbers shall be placed either in the
center of the building or on the street end of the building so as to be visible from either the public
or private street or from the parking lot, color, numbers shall be contrasting to the background
color, Arabic numerals, all numbers used shall be Arabic numerals. Commercial, industrial and office
buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, property line or
driveway, should the building be located far enough from a public or private road so that the
numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building, color; each building, numbers shall
be contrasting to the background color and shall be placed on each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals, Shopping centers. Shopping centers
consisting of two or more stores shall have a tenant or suite number affixed to the front of the
tenant space and on the outside of the rear door which corresponds with that tenant space.
Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)
19. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system
that is monitored off-site, or any occupancy that contains an automatic sprinkler system. (2015
Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new
or existing building where a fire alarm or sprinkler system is being installed. It shall be the
responsibility of the owner or occupant to keep a set of keys in the secured key box that are
current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard
service shall be exempt from this subsection. Location. The secured key system shall be
located as close to the main entrance as possible. Should the building design not allow the
secured key system to be located by the main entrance, the fire marshal and fire chief shall
come to an agreement as to an alternate location for the key box. A secured key system, once
installed, shall not be obstructed from view or obstructed by any means that would delay
the fire department access to the box. Required keys. Keys to be secured in the key box shall
include keys to all points of ingress or egress, whether on the interior or exterior of the
building, and keys to locked mechanical rooms, electrical rooms, elevator rooms, fire alarm
and sprinkler controls and any area protected by automatic fire detection. Keys to individual
residential apartment units are not required. Ordering responsibility. It shall be the
responsibility of the general contractor to order the key box for new buildings. It shall be
Page 51
the responsibility of the owner or tenant to order the key box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted
before the installation of a key box. (City Code of Ordinances 46-127)
20. All required means of egress shall have an exit discharge consisting of a non-slip surface, and
leading to and terminating at a public way.
21. Project to be completed per approved Site Plan.
22. Full building and fire plan review is required.
23. Construction or renovations cannot be started until building plans are approved.
24. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire marshal’s Office. This work cannot be started until the permit is approved.
25. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
ADDITIONAL / SPECIFIC COMMENTS:
1. Clarify what residential type is proposed.
2. Proposed building is sprinklered.
3. Hydrant required within 300ft of FDC
4. Fire Lanes installed correctly per item #3-7
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 52
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: November 1, 2017 T
===============================================================
APPLICATION: Multiplex at 299 College Road
FILE#: S-17-28 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
The site access on College Road must be designed in accordance with DelDOT’s
Development Coordination Manual. A copy of the Manual is available at
http://www.deldot.gov/information/business/subdivisions/changes/index.shtml
The entrance throat appears to be narrower than 24’ which is our standard.
The manual addresses that there should be a 15’ permanent easement beyond the
right-of-way. On the plans you are only proposing a 10’ PE. In order to allow this, you
must request a written waiver from the Development Coordination section.
Pursuant to Section P.3 of the Manual, a Pre-submittal meeting is required before plans
are submitted for review. The form needed to request the meeting and guidance on
what will be covered there/ how to prepare for it is located at
http://www.deldot.gov/information/business/subdivisions/Meeting_Request_Form.pdf
.
Page 53
Section P.5 of the manual addresses fees that are assessed for the review of the
development proposals. DelDOT anticipates collecting the Initial Stage Fee when the
record plan is submitted for review.
In accordance with Section 3.4 of the Manual, a record plan shall be prepared prior to
issuing “Letter of No Objection” review:
Initial Stage Fee Calculation Form
Initial Stage Review Fee
Gate-Keeping Checklist – Site Plan
Design Checklist – Record Plan
Sight Distance Spreadsheet
Owners and Engineers’ name and e-mail address
Record Plan
Conceptual Entrance Plan
Submission of the Area – Wide Study Fee (If applicable)
Referring to Section 3.4.2.1 of the Manual, the following items, among other things are
required on the Record Plan:
A Traffic generation Diagram. See 3.4.2-a for the required format and content.
Depiction of all existing entrances within 600 feet of the proposed entrance.
Notes identifying the type of off-site improvements, agreements (signal, letter)
contributions and when the off-site improvements are warranted.
In accordance with Section 3.5.4.2.A.3 of the Manual, DelDOT will require construction
of a sidewalk/ Shared Use Path along the property frontage of College Road. If the intent
is to leave the existing sidewalk, then we will need to confirm its ADA compliance. If it
does not meet regulation it will need to be replaced.
Referring to Section 4.3 of the Manual, an entrance plan shall be prepared prior to
issuing entrance approval. The following information will be required for Entrance Plan
review:
Construction Stage Fee Calculation Form
Construction Review Fee
Gate-Keeping Checklist – Entrance Plan
Design Checklist – Entrance Plan
Auxiliary Lane Spreadsheet
Entrance Plan
Pipe/ Angle Spreadsheet (If Applicable)
SWM Report and Calculations (If Applicable)
Page 54
In accordance with Section 5.2.5.6 of the Manual, Turning Movement Diagrams shall be
provided to verify vehicles can safely enter and exit the site entrance. As per Section
5.2.3 of the
Manual, the entrance shall be designed for the largest vehicle using the entrance.
In accordance with Section 5.2.9 of the Manual, the Auxiliary Lane Worksheet should be
used to determine whether auxiliary lanes are warranted at the site entrance and how
long those lanes should be. The worksheet can be found at
http://www.deldot.gov/information/business/subdivisions/auxiliary_lane_worksheet.xl
s.
In accordance with Section 5.4 of the Manual, sight distance triangles are required and
shall be established in accordance with American Association of State Highway and
Transportation Officials (AASHTO) standards. A spreadsheet has been developed to
assist with this task. It can be found at
http://www.deldot.gov/information/business/subdivisions/Intersection-Sight-
Distance.xls.
In accordance with Section 5.14 of the manual, all existing utilities must be shown on
the plan and a utility relocation plan will be required for any utilities that need to be
relocated.
Section 7.7.2 of the Manual addresses the need to provide 20-foot wide drainage
easements for all storm drainage systems open or closed, that fall outside the existing
right-of-way or the drainage/ utility easement. In accordance with this section, metes
and bounds and total areas need to be shown for any drainage easements. The
easements should be shown and noted on the record plan.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 55
City of Dover
DATA SHEET FOR SITE DEVELOPMENT MASTER PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF November 8, 2017
PLANNING COMMISSION MEETING OF November 20, 2017
Plan Title: Delaware State University Residence Hall: Master Plan, S-17-29
Plan Type: Site Development Master Plan
Property Location: North side of College Road, west side of North DuPont Highway
Property Address: 1200 North DuPont Highway
Tax Parcels: Portion of ED-05-057.00-01-21.00-000
ED-05-057.00-01-20.00-000
ED-05-057.00-01-19.00-000
Owner: State of Delaware c/o Delaware State University
Site Area: 287.32 acres +/- (Total of 240.29 acres North of College Road)
Project Area: 4.80 acres +/- (209,088 S.F.) considered to be Development Area
Existing/Proposed Use: University campus
Project Area Existing Use: Open Area and existing Residence Halls
Project Area Proposed Use: Residence Hall (600 beds) and Dining Facility
Building Areas: New Building: 190,000 S.F.
Existing Building (to be demolished)/ Laws Hall: 18,532 S.F.
Existing Building (to be demolished)/Tubman Hall: 14,281 S.F.
Off Street Parking: 1,650 spaces required for Campus (Established by BOA in 2009)
2,243 spaces provided on Campus
31 spaces removed by project development
200 spaces required for New Residence Hall (Dormitory)
Impervious Surfaces: Campus (North area) Existing: 73.38 acres (33.97%)
Campus (North area) Proposed: 74.48 acres (34.48%)
Net Increase in Project Area of 1.10 acres (48,060 S.F.)
Sewer & Water: City of Dover
Zoning Classification: IO (Institutional and Office Zone)
SWPOZ (Source Water Protection Overlay Zone)
For Consideration: Demonstration of Loading Space needs
Waiver Requested: Partial Elimination of Sidewalk (segment of College Road)
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 56
City of
Dover
CITY OF DOVER
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: November 8, 2017
APPLICATION: Delaware State University Residence Hall: Site Development Master Plan
FILE #: S-17-29 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: (302) 736-7196
I. PLAN SUMMARY:
This is a Site Development Master Plan to permit phased construction of a new 190,000 S.F.
five-story Student Residence Hall at Delaware State University. The project phases consist of
the following: Phase 1- Relocation of Utilities, Phase 2 - Construction of Residence Hall (600
Beds) and Demolition of Laws Hall, and Phase 3 - Demolition of Tubman Hall. The subject
project area consists of 209,088 +/- S.F. (4.80 +/- acres) internal to the Delaware State University
Campus of 287.32 +/- acres. The property is zoned IO (Institutional and Office Zone) and subject
to the SWPOZ (Source Water Protection Overlay Zone) – Tier 3: Excellent Recharge Area. The
campus is location west of North DuPont Highway and north of College Road. The owner of
record is State of Delaware c/o Delaware State University. Property Address: 1200 North DuPont
Highway. Tax Parcels: ED-05-057.00-01-19.00-000, ED-05-057.00-01-20.00-000, and ED-05-
057.00-01-21.00-000. Council District 4.
Current Application
Preliminary Land Use Services Review (PLUS)
The application was evaluated for the necessity of Preliminary Land Use Services Review. This
project met the project size threshold established in the City of Dover’s Memorandum of
Understanding (MOU) that requires completion of the PLUS Review process prior to application
submission. However, for this Site Development Master Plan, a waiver of the requirement for
PLUS Review process was sought and received from the Office of State Planning Coordination
via a letter dated October 3, 2017 citing its location within an existing developed campus and
that the proposed new construction was to replace two existing dormitory facilities.
II. PROJECT DESCRIPTION
The Site Development Master Plan proposes three (3) phases of the project for the Delaware
State University Student Residence Hall. Overall, the project involves the following:
Phase 1: Relocation of Utilities (water, sanitary sewer, stormwater, gas, etc.) within the
project area to accommodate the location of a new building.
Phase 2: Construction of new Student Residence Hall as five stories and 190,000 S.F. to
include 600 beds and associated dining facilities. Project area location in southwestern
portion of campus between Loockerman Hall and Warren & Franklin Hall. Phase also
includes the demolition of Lydia P. Laws Hall, an existing dormitory building.
Page 57
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 2
Phase 3: Demolition of Harriet Tubman Hall, an existing dormitory building.
The project also includes the associated site improvements related to sidewalks to interconnect
the building with the existing network on campus, stormwater management facilities, and
landscaping. In the project development area, an existing parking lot of thirty-one (31) parking
spaces will be removed.
III. ZONING REVIEW
SWPOZ (Source Water Protection Overlay Zone)
The site is located within the SWPOZ (Tier 3: Excellent Recharge Area) and subject to Article 3
Section 29.7 of the Zoning Ordinance. The proposed use as a university campus with residential
and dining facilities is not prohibited in the SWPOZ. For Tier 3: Excellent Recharge Areas, the
maximum lot coverage for the site is 30% unless infiltration is utilized then the maximum lot
coverage is 60%. The plan indicates that the campus has an existing impervious coverage of
33.97%. The lot coverage was calculated by utilizing the portions of the three university parcel
areas located north of College Road. With this project, the lot coverage for the campus is proposed
to increase to 34.48%. The project will be required to utilize infiltration practices; two potential
options for underground infiltration systems are shown in the plan set. In the SWPOZ, the
differential volume of stormwater between the 30% and 60% lot coverage must utilize infiltration.
Thus the stormwater resulting from the increase in the lot coverage from 33.97% to 34.48%
(increase of 0.51% in lot coverage) must be infiltrated. If infiltration is not a viable option the site
shall comply with the existing lot coverage; this would require elimination of impervious surfaces.
IO Zoning District
The Delaware State University campus property is zoned IO (Institutional and Office Zone) and
subject to the regulations of Zoning Ordinance, Article 3 Section 10 and Article 4 Section 4.15.
The proposed use as a residence hall and dining facility are expected building types found at a
university, which is a permitted use in the zoning district.
Site Development Master Plan
The plan for this project is submitted for review under the Site Development Master Plan process
(See Zoning Ordinance, Article 10 §2.44 listed below). This process allows for a series of
construction phases to be outlined in a Master Plan for Planning Commission review and
approval. Prior to each Phase of construction, a Site Plan specific to that phase is submitted for
Administrative Site Plan review.
Article 10 §2.44 Site development master plans. Conceptual site development master plans shall
be reviewed by the planning commission in accordance with the provisions of subsection 2.43.
Conceptual site development master plans shall depict a site development proposal that reflects
general compliance with the provisions of the zoning ordinance and shall also reflect the following
information on the plan:
(A) Conceptual Master Plan. Conceptual Master Plan shall include the proposed general
layout of building, streets, parking, open space, landscape concepts, and stormwater
management areas.
(1) Detailed site construction plans, details, and specifications are not required as
part of a site development master plan submission.
(2) The plan shall illustrate distinct phase boundaries for each proposed construction
phase and shall depict proposed construction and site improvements planned for
each phase. Bulk quantities and area totals for each construction phase, and for
the total site, shall be tabulated in a data column on the plan.
Page 58
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 3
(3) Each construction phase shall be enumerated in sequential order on the site
development master plan according to the order of construction contemplated by
the plan. Phases shall be implemented in accordance with the approved site
development master plan unless the city planner approves an alternate phasing.
(4) Each construction phase represented on the master plan shall be planned and
designed to function independent of construction and site improvements
contemplated in future construction phases in all respects, including but not
limited to bulk area provisions of the zoning district in which the site is located,
off-street parking requirements, site entrances, emergency access requirements,
site utilities, and stormwater management improvements except where the
requirements and needs of a later phase are met and remain met by a previous
phase of completed construction.
(5) Any special agreements or conditions of approval relative to the overall
development that have been specified by regulatory agencies shall be
documented on the site development master plan.
(B) Phased site plan approval. Individual phased components of the Conceptual Master
Plan are to be reviewed and approved as an Administrative Site Plan. Final site
construction plans, including detailed site grading, paving, utilities, stormwater
management, and tree planting and preservation plans shall be submitted for final
approval by the city planner and/or authorized designee, and to other agencies
having jurisdiction, on a phase by phase basis in accordance with the approved site
development master plan, and all regulations of the City of Dover governing the
approval of site plans as set forth in subsection 2.4 and 2.5.
IV. PARKING SUMMARY
The parking requirement for a university is one (1) parking space for every five (5) seats in the
auditorium or cafeteria. The Board of Adjustment set the required number of parking spaces
needed for the Delaware State University Campus at 1,650 parking spaces per Article 6 Section
3.8 of the Zoning Ordinance on April 15, 2009 (V-08-19).1 At the time the campus had 2,256
parking spaces exceeding the required 1,650 required by 606 parking spaces. Construction
activities on campus since 2009 have revised the number of existing parking spaces to 2,243
spaces (following S-09-09). Then construction activities with the Applied Optics Research
facility building (S-12-12 and S-13-02 Phase 2) required 93 parking spaces; these were satisfied
by the “excess” parking spaces available on campus.
With this project, the parking requirement for the new Residence Hall when based on the
dormitory parking rate of one space per three beds would require 200 parking spaces for its 600
beds. This plan claims the parking space credits available from the existing spaces on campus. In
addition, this plan will reduce the available parking by 31 spaces through the elimination of a
parking lot located in the project area. As a result, the campus parking will stand at 2,212
existing parking spaces remaining (which is in compliance with the 1,650 parking space required
as set by the Board of Adjustment in 2009 and the subsequent construction activities) and the
increase in parking needs of the new Residence Hall Building is covered by the excess parking
available on campus.
Loading Spaces (Consideration of Loading Space Justification)
For buildings in excess of 150,000 S.F., loading spaces are required to be sufficient for the use and
must be demonstrated in writing during the plan submission. The plan shows two loading spaces on
1
The provisions of Zoning Ordinance, Article 6 – Off Street Parking, Driving and Loading Facilities has since been
amended. Currently, Article 6 §3.8 Combined spaces allows the Planning Commission to establish the parking
requirements for lots having multiple uses through review of a campus parking plan.
Page 59
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 4
the west side of the building presumably near the dining facility portion of the building. The Zoning
Ordinance also recognizes joint facilities usage of loading spaces. As a campus, the University may
also function with a centralized receiving/processing facility. A written description of the loading
spaces needs specific to the building and describing the campus procedures for receiving was
submitted for consideration by the Planning Commission.
Bicycle Parking
The site is required to provide bicycle parking. The bicycle parking calculation is one for every
twenty parking spaces. The number of bicycle parking spaces on the overall Delaware State
University campus is unknown. Based on the 200 parking spaces specifically required for this
new Residence Hall building, at least ten (10) bicycle parking spaces are required for the project
area and must be identified on the plan.
V. SITE CONSIDERATIONS
Entrance
The entrances to the Delaware State University campus from the local road network remain
unchanged with this project with the main entrance to campus from North DuPont Highway and
several entrances from College Road. The project site for the development of the new Residence
Building is in the campus area of the existing dormitory buildings of Lydia P. Laws Hall and
Harriet Tubman Hall, both of which will be demolished at points during the phased project. The
project site is in the block north of Old College Road to the north of Warren & Franklin Hall and
south of Loockerman Hall and other buildings. The westernmost campus entrance from College
Road is to the southwest of the project development area.
Waiver Request: Partial Elimination of Sidewalks (Pathways)
Sidewalks are required along all street frontages of a property (Zoning Ordinance, Article 5
Section 18) for development proposals subject to Site Development Master Plan review by the
Planning Commission.2 Review of the Delaware State University campus properties (located
north of College Road) shows sidewalks along the North DuPont Highway frontage of the
properties and for portions of the College Road frontage. The segment of College Road located
east of the westernmost entrance does not included street frontage sidewalk.
A written waiver request was submitted for consideration by the Planning Commission for the
segment of College Road which does not have existing sidewalk. The applicant cites the physical
characteristics of that frontage (drainage swale, grade differences, and mature evergreen trees) as
reasons for elimination of the sidewalk. In addition, they discuss on-going pedestrian circulation
planning efforts on the campus. The Planning Commission should act on this waiver request as
part of their review of the Site Development Master Plan; see the following Zoning Ordinance
citation on waivers of pathways. Sidewalks are a type of pathway.
Article 15 §18.5 Waiver of pathway locations requirements. The property owner or developer may
request a waiver from the planning commission or city planner, according to the type of plan
review required by article 10 of this ordinance, under the following circumstances in order to
reduce or eliminate the requirements for pathway installation:
2
Article 5 Section 18 pertaining to sidewalks was retitled Article 5 Section 18 – Pedestrian, bicycle, and multi-
modal access requirements and the requirements were amended by Ordinance #2017-12 adopted by City Council on
October 9, 2017.
Page 60
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 5
a) When the property is isolated from the existing pathway network, with no existing
pathways within the immediate vicinity of the property.
b) When the proposed use would not generate or attract additional pedestrian, bicycle, or
other non-motorized trips.
c) When physical characteristics of the property are such that pathway installation is
impractical or impossible.
The project development area is internal to the campus and contains a system of
sidewalks/pathways linking the adjacent buildings to the new building. The New Residence Hall
is shown to have a series of wide pathways (brick and concrete) to serve pedestrians and also as
the require fire lane access for the new building.
Curbing
The upright curbing for parking lots and drive aisles is required the requirements of Article 6
Section 3.6(b) of the Zoning Ordinance. This curb type appears to be utilized throughout the
project area (due to existing conditions) and with what is likely depressed curbing at the
necessary access points to the wide pathway sidewalks that serve as fire lanes. Under recent
Code amendments, the City Planner can consider requests to eliminate curbing when there is a
demonstrated need related to stormwater management.
Dumpsters
The institutional buildings are required to have two (2) dumpster pads based on the size of the
institutional building at a rate of two per the first 80,000 SF with one required for each additional
40,000 S.F.3 Thus it requires five dumpsters for this building. The plan notes that the University
has a centralized trash pick-up and disposal process for the campus. However, locations for these
dumpster pads must be reserved at a location on campus for future potential use. A location for a
reserved dumpster pad area is shown on the plan with a note stating that the dumpsters shall be
constructed if determined to be necessary by the Planning Director.
VI. BUILDING ARCHITECTURE
Conceptual Renderings and Elevation Drawings were submitted for the New Residence Hall
Building. The building is proposed as a five story building with what a flat roof with taller
parapet walls at the edge. Each building elevation includes a series of changes in the wall plane
by section and other projections i.e. an upper floor projecting over a lower floor. The building
includes the exterior finishes of brick masonry with detailing in the brickwork and with the
placement of cast stone or precast trim in select locations. The windows there are details at the
sills and headers and window openings of glass surrounded by metal panels or fiber cement
panel infills. The exterior finish of the fifth floor is fiber cement panels rather than brick
masonry. The first floor of the building and select vertical areas include larger areas of aluminum
glass storefront window systems of spandrel and frosted glass.
VII. TREE PLANTING AND LANDSCAPE PLAN
The submitted plan includes the Landscaping approach for the overall project. Zoning
Ordinance, Article 5, Section 16.62 offers the option of the applicant defining a “Development
Area” within the overall property for the purpose of tree planting calculations. Planning Staff is
equating the delineated project area shown on the plan as the “Development Area” since the
3
The Dumpster requirements of Article 5 Section 6 – Dumpsters for trash and recycling were amended by
Ordinance #2017-12 adopted by City Council on October 9, 2017.
Page 61
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 6
project location is within the central area of the campus (i.e. not adjacent to property lines). The
Development Area of 4.8 acres (209,088 S.F.) requires seventy (70) trees. The Landscape Plan is
providing a mixture of trees (appears to be at least three types from the graphic depiction) to
provide a total of seventy (70) trees; the specific tree species will be identified in the
Administrative Site Plans for Phases 2 and 3.
Arterial Street Buffer
North DuPont Highway (U.S Route 13) is considered as a principal arterial and requires a thirty (30)
foot landscape buffer along the road frontage known as an Arterial Street Buffer. The buffer is
measured from the edge of the right-of-way. The University campus provides this required thirty
(30) foot landscape buffer along DuPont Highway which includes tree plantings, landscape
plantings of shrubs and annuals, and a brick wall. Activities of this Site Development Master Plan
do not impact the Arterial Street Buffer.
VIII. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with this agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) A written justification of the loading space needs for the building (and any campus-wide
receiving procedures) was submitted for consideration by the Planning Commission in order
to determine if the proposed number of loading spaces is sufficient. The project proposed
proposes construction of two (2) new loading spaces.
2) Upright curbing shall be provided in accordance with the Zoning Ordinance. A waiver may
be granted by the City Planner if necessary for stormwater management. Such requests
should be identified with the Administrative Site Plan submissions.
3) Sidewalks are required along all street frontages of a property subject to this review process;
currently there is not sidewalk along a portion of College Road. A written waiver request was
received for consideration by the Planning Commission.
4) Cover Sheet, Sheet C-001:
a. Site Data column, Item 11: Explain the Total Area at Completion. If the new
Residence Hall building is 190,000 SF in size isn’t this the total area at completion
as that number doesn’t include the two dormitories to be demolished.
b. Site Data column, Item 15: This is not a waiver but a ‘justification’ for
determination.
c. General Notes, Items 26 and 28: The same note is repeated.
5) Plan drawings: Clarify the square footage listing on the existing buildings as footprint only.
If known add listing of total floor area of building.
6) A system of bollards, etc. may be necessary to limit non-authorized use of the wide
pathway/sidewalk areas, especially at the connection points to the campus’ internal street
network. Consult with Fire Marshal’s Office on format.
Page 62
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 7
7) Landscape Plan, Sheet L1.00:
a. Ensure tree planting locations and landscaping maintain the required spacing
distances or access provisions from utility lines, fire hydrants, etc.
b. Additional information on the selected tree species, size, details, and tree planting
calculations will need to be provided as part of the Administrative Site Plan
submissions.
8) The Master Plan set will need to be updated to document and reflect any changes
recommended or approvals or waivers granted by the Planning Commission.
9) A separate Record Plan sheet may need to be prepared to record and document any proposed
easements, right-of-way dedications, etc. for the project activities.
10) Any Sediment & Stormwater Management Plans granted approval by DNREC must reflect
the Site Plan layout and design conditionally approved by the Planning Commission and be
in compliance with the Zoning Ordinance and technical review requirements of other
agencies.
IX. RECOMMENDED ADDITIONAL CONSIDERATIONS TO MEET CODE
OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Loading Spaces: In accordance with Article 10 subsections 2.21 and 2.27 and the loading
space requirements of Article 6, Section 4, Staff recommends approval that this building
project can be sufficiently serviced by two (2) loading spaces. This finding is based on the
uses and functions of the building and the on-campus procedures for receiving and
distribution activities of goods and trash management as described in the applicant’s Loading
Space Justification document dated November 7, 2017.
2) Waiver Request: Partial Elimination of Sidewalks: In accordance with Article 10 subsection
2.21 and Article 5 Section 18.5, Staff recommends approval of the waiver request to
eliminate the requirement for the construction of sidewalks along a segment of the north side
of College Road. This is based on the findings that the physical characteristics of this
frontage area with existing drainage swales, grading, and mature evergreen trees (as
screening) would be impactful to the design and construction of the sidewalk. Also this is a
segment unlikely to be traveled by pedestrians as there are pedestrian circulation systems
(sidewalks and pathways) internal to the campus setting which traverse the area connecting
buildings and parking lots.
3) Pedestrian Connections: In accordance with Article 10 subsection 2.21 related to safety and
Page 63
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 8
convenience of vehicular, transit, bicycle, and pedestrian traffic, Staff recommends the
following pedestrian access improvements:
a) Ensure campus entrance from College Road (westernmost) and the nearby Old College
Road and Loop Road intersection include the required accessibility ramps and pedestrian
crosswalk markings to maintain a viable pedestrian connectivity.
b) Consider implementation of bollard systems at points of connection of the wide
pathway/sidewalks surrounding the new building with the adjacent vehicular road system
internal to the campus.
c) Provide several locations for bicycle parking as the new Residence Hall has multiple
approaches. The design of the building may also provide opportunities for covered
bicycle parking as well.
Other agencies may recommend additional conditions and safeguards in accordance with
their areas of expertise. The Recommended Additional Considerations to Meet Code
Objectives may be accepted or rejected by the Planning Commission.
X. ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers
are at the discretion of the Planning Commission. The Commission may approve or deny
waiver requests.
2) The U.S. Route 13 Circulation Study and the 2008 Comprehensive Plan discuss concepts
for implementation of a connector road which continues Crawford Carroll Avenue to the
south for new interconnections with North DuPont Highway and through the Delaware
State University campus to College Road. Discussion of the appropriate timing of right-
of-way designation will need to occur between the City, DelDOT, and Delaware State
University. This transportation network planning element should be incorporated into the
University’s on-going efforts of master planning of the campus.
3) In the event, that major changes and revisions to the Master Plan occur in the finalization
of the Master Plan or during the Administrative Site Plan process contact the Planning
Office. Examples include reorientation of or size changes of the buildings, relocation of
site components, etc. These changes may require resubmittal for review by the
Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations in regards to the plan.
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) The site is located within the SWPOZ (Tier 3: Excellent Recharge Area) and the Planning
Office and DNREC will coordinate to ensure compliance.
6) Following Planning Commission approval of the Site Development Master Plan, the Plan
must be revised to document all conditions of approval from the Development Advisory
Page 64
S-17-29 Delaware State University Residence Hall: Master Plan
DAC Report of November 8, 2017
Page 9
Committee or as otherwise noted. The Site Plan of each construction phase/project area
must be submitted for Administrative Site Plan Review by the Planning Office and other
agencies. Zoning Ordinance, Article 10 §2.44 (D) sets forth the construction timing in
relation to approvals.
Article 10 §2.44
(D) Expiration of planning commission approval. For projects which are reviewed and
approved by the planning commission as conceptual master plans, approval of the
conceptual master plan shall remain valid for a period not to exceed five years from the
date of planning commission approval, provided that the authorized construction or use
has commenced within two years of approval and is proceeding toward completion. In
addition, the time between the completion of one phase and the initiation of the next
phase shall not exceed a period of two years.
7) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
8) The applicant/developer shall be aware that prior to any development or ground
disturbing activities on the site the appropriate site inspections and permits are required.
9) Construction may have an effect on the adjacent campus areas. Any work requiring the
closing or rerouting of employees, students, or visitors to adjacent areas should be
coordinated to address construction safety, continual fire protection needs, etc.
10) It is noted that the nearby Loockerman Hall building is listed on the National Register of
Historic Places (Delaware Cultural Resource Survey #K-112). Such properties are given
protection under the National Historic Preservation Act of 1966 and need to be
considered if project activities include Federal actions (i.e. funding, permitting).
11) The appropriate permits (as regulated by DNREC) will be required for the removal of the
fuel storage tanks noted on the plan drawing.
12) The applicant shall be aware that Master Plan approval does not represent a Sign Permit,
nor does it convey permission to place any sign on the premises. Any proposed site or
building identification sign may require a Sign Permit from the City of Dover prior to
placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
13) The applicant shall be aware that Master Plan approval does not represent a Building
Permit and associated construction activity permits. A separate application process is
required for issuance of a Building Permit from the City of Dover.
a. An Administrative Building Permit will be required for the Phase 1: Utility
Relocation activities as a project tracking mechanism.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 65
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOVEMBER 1, 2017
APPLICATION: Delaware State University Residence Hall at 1200
N. DuPont Highway- Master Plan
FILE #: S-17-29
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 66
Delaware State University Residence Hall at 1200 N. DuPont Highway- Master Plan
File #: S-17-29
November 1, 2017
Page 2 of 4
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
c. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7025 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must
be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must
be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is
required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the
building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap
and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is
recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The
Department of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind
flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must
be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall
be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor
to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls
and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
Page 67
Delaware State University Residence Hall at 1200 N. DuPont Highway- Master Plan
File #: S-17-29
November 1, 2017
Page 3 of 4
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings)
showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County
ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the
proposed location, must be provided on the plan.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from DNREC is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted
to our office.
SANITATION / GROUNDS
1. None.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
3. Sheet C-001, General Notes
a. Note #12 and #19- Please replace Public Utilities Department with Department of Public Works
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / SANITATION / GROUNDS / GENERAL /STREETS
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
Page 68
Delaware State University Residence Hall at 1200 N. DuPont Highway- Master Plan
File #: S-17-29
November 1, 2017
Page 4 of 4
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking
Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan
sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the
Office of Drinking Water until review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
4. Water impact fees may be required for this proposed site plan.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Prior to plan approval, the sanitary sewer system plans may be required to be submitted to the DNREC, Division of
Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible
for providing all application fees, completed forms and plan sets directly to DNREC.
3. Wastewater impact fees may be required for this proposed site plan.
STORMWATER / GROUNDS / STREETS
1. None.
SANITATION
1. This building shall be served by a private solid waste removal company.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 69
C F
S-17-29 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 11/08/17 D S
O H
V A
E L
R
APPLICATION: Delaware State University Residence Hall 1200 N DuPont Hwy
FILE #: S-17-29 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Matthew Brown, Deputy Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
Routine Comments:
1. Proposed building is Residential (Residence and Dining).
2. Building Access shall be no further than 50 feet from a primary entrance, where buildings are
provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall
be no further than 100 feet from the primary entrance. (2015 Delaware State Fire Prevention
Regulations, 705, Chapter 5, 3)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times
the width of the door(s) or for 10 feet, whichever is greater. (2015 Delaware State Fire Prevention
Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 100% and clearly shown on the plans. Perimeter Access minimum
width shall be 15 feet measured from the face of the building at grade with a maximum slope of
ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.)
shall be permitted within the perimeter access, and shall not interfere with emergency services
fire ground operations. If a physical barrier (fence, pond, steep slope, etc.) prevents access, that
portion of the building perimeter shall not be included in the calculation of Percent of Perimeter
Access. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3)
5. Fire lanes shall cover 75% of the proposed building. Fire lanes are required to be 24 feet wide and
run along the front of the building as determined by the primary entrance(s). In cases where
there is more than one primary entrance(s), each shall be served by a fire lane even if this exceeds
the percentage as required. The closest edge of fire lanes shall not be located closer than ten (10)
feet to the exterior wall and the closest edge of fire lanes shall not be located further than 50 feet
from the exterior wall if one or two stories in height; 40 feet if three or four stories in height, or
Page 70
30 feet if over four stories in height. (2015 Delaware State Fire Prevention Regulations, 705,
Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located
closer than 15 feet to the exterior wall. (2015 Delaware State Fire Prevention Regulations, 705,
Chapter 5, 6.4.1)
7. All Fire Lanes shall be marked as follows: both the inner and outer edges of the fire lane shall be
marked, where curbs are present, the top and face of the curb shall be painted yellow, where no
curbs are present, a four inch (4”) solid yellow demarcation line shall mark the edge(s) of the fire
lane. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows: see Figure 5-16 – Approved Sign For Marking Fire
Lanes, fire lane signs shall be spaced at 150 foot intervals maximum, all fire lane signs shall be
located no less than six feet (6’) and no higher than eight feet (8’) above the pavement, signs shall
be placed at each end of the fire lane, and signs shall face all oncoming traffic. Where parking is
not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire lane
signs, and shall conform to the specifications of 7.6. (2015 Delaware State Fire Prevention
Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over
any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be
provided and the portion of the building perimeter which contains overhangs, canopies,
balconies, or any other building features shall not apply towards the fire lane accessibility
requirements of Section 4.0, Table 5-1 in this chapter. (6.8.4) (2015 Delaware State Fire
Prevention Regulations, 705, Chapter 5, 6.8)
11. Emergency access to rear building areas compliant with City of Dover Code (Article 5-
Supplementary Regulations, Section 17); all four stories and greater buildings require 24ft fire
lane at the rear.
12. Multiple Access Roads shall be provided when a fire department access road (fire lane) is
determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain,
climatic conditions, or other factors that could limit access such as placement of fire hose from
fire equipment.
13. Street width shall be in accordance with City of Dover Code of Ordinances, Article VII, Section
A. 13, 24 feet wide with no parking, 30 feet wide with parking on one side, or 36 feet wide with
parking on both sides Or 24 feet wide with no parking, 28 feet wide with parking on one side, or
34 feet wide with parking on both sides Any dead end road more than 300 feet in length shall be
provided with a turnaround or cul-de-sac as outlined in the 2015 Delaware State Fire Prevention
Regulations 705,chapter 5, 2.3.
14. Speed Reduction Devices must be approved, please see City of Dover Ordinance 98-10 in
reference to this process.
Page 71
15. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual. An automated system shall consist of one manual and one automated
means to open the gate. The owner or their representative shall meet with the Fire Marshal prior
to submission to agree on the system. A letter of agreement shall be created, and signed by both
parties. The letter shall include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to
open. A letter of agreement shall be created, and signed by both parties. The letter shall include a
detailed description of the manual means to open. To be considered accessible for fire
department apparatus the actual clear openings shall be not less than 14 feet, the paved surface
through the gate shall be not less than 12 feet, and the gate shall be setback from the
perpendicular street by at least 50 feet. (2015 Delaware State Fire Prevention Regulations 705,
Chapter 5, 2.6)
16. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation
and as illustrated by the appropriate figures of this regulation. All fire hydrants shall have
minimum of four inch (4") solid yellow demarcation lines to define specific areas, where fire
hydrants are located along a curb line with permitted parking, the area between the fire hydrant
and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words
"NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and
extend for a distance 15 feet on both sides. Where fire hydrants are located in parking lots or
other areas susceptible to blockage by parked vehicles they shall be treated as follows: fire
hydrants shall be protected in all directions for a distance of seven feet (7') with barriers or
curbing, Minimum four inch (4") diameter steel bollards filled with concrete and marked yellow
shall be installed at the outermost corners of the fire hydrant demarcation area. The minimum
height of the bollard shall be 36 inches above the finished grade of the adjacent surface, and the
steamer connection of all fire hydrants shall be positioned so as to be facing the edge of the street,
or traffic lane. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
17. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel
under the top flange, hydrant bonnets shall be color coded based on the following criteria: class
AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 -
999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM -
painted black. (2015 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
18. Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal, and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code. Fire alarm
system required. Any existing occupancy or portion of an existing occupancy determined to be a
place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the
assessed value of the building and is capable of receiving an occupant load 75 persons or greater
or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to
install a complete fire alarm system in accordance with NFPA codes governing the installation of
fire alarms and the National Electrical Code. Public mode audible requirements. To ensure that audible
Page 72
public mode signals are clearly heard by occupants of a structure, they shall have a sound level at
least 15 decibels (dB) above the average ambient sound level or five decibels (dB) above the
maximum sound level having a duration of at least 60 seconds, whichever is greater, measured
five feet (1.5m) above the floor in the area required to be served by the system using the A-
weighted scale dBA. In the event the stated requirement cannot be met a shunt trip
relay/switches shall be the approved method of meeting the intent of this section of the Code.
(City Code of Ordinances 46-171)
19. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
Places of assembly shall be sprinklered throughout in accordance with the most recently
adopted edition of NFPA 13 when the following apply: All new indoor places of assembly with
an occupant load of 150 persons or greater. Any interior renovations of 50 percent or more to an
existing place of assembly with an occupant load greater than 150 persons. Any additions or
increase in interior size to an existing place of assembly that would create an occupant load of
150 persons or greater. Places of assembly where alcohol is served for consumption on the
premises shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13 when the following apply: All new indoor places of assembly with an
occupant load of 100 persons or greater and where alcohol will be served for consumption on
the premises. Any interior renovation of 50 percent or more to an existing place of assembly
with an occupant load greater than 100 persons and where alcohol will be served for
consumption on the premises. Any additions or increase in interior size to an existing place of
assembly which would create an occupant load of 100 persons or greater and where alcohol
will be served for consumption on the premises. New educational occupancies of 5,000 square
feet or greater shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13. (City of Dover Code of Ordinances 46-162)
20. Fire Department Connection is to be a 5 inch stortz connection on a 30 degree elbow located within
50 feet of main entrance. Fire Department Connection shall be located at the nearest point of fire
department apparatus accessibility (front of the building) or at a location approved by the AHJ.
Access to the Fire Department Connection must be clear unobstructed access as defined by the
AHJ.
21. Parking and/or obstructions shall be prohibited in front of fire department connections for a
distance measuring from the center line and extending four feet on both sides. (2015 Delaware
State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
22. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
23. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow
demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from
the center line of the connection and extend for a distance of four feet (4') on both sides, and
where parking is allow between the building and the street or fire lane the solid yellow
demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane
(Markings shall not be required on the sidewalk surface). All fire department connections
(standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT.
CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite
letters on white scotchlite background. The sign shall be clearly visible from the fire lane or
Page 73
roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2015
Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
24. Standpipes shall be provided in all areas and buildings as required in the codes and standards
listed in Regulation 701 as well as the following areas or buildings: In all Class A and Class B
places of assembly and institutional occupancies two (2) stories or 25 feet in height or over, In
any building over three (3) stories, In any building over 35 feet in height, In any building that has
a floor above the first floor over 10,000 square feet gross floor area, In all buildings where the 1st
floor exceeds 60,000 gross square feet, a Class I horizontal standpipe system installed in
accordance with the applicable codes and standards listed in Regulation 701 of these Regulations
shall be provided. All standpipe systems shall be installed in accordance with the applicable
codes and standards listed in Regulation 701.The standpipe system shall be carried up with each
floor and shall be installed and ready for use as each floor progresses. Standpipes shall not be
more than one floor below the highest forms of staging, The 2½-inch of hose connections on
Class I systems shall be provided in the following locations, At the highest intermediate landing
between floor levels in every required exit stairway, Where intermediate landing are not
provided, hose connections shall be permitted to be located at the main floor landings in exit
stairways when approved by the authority having jurisdiction, Where the local fire department
has the capability of providing the required pressure, hydraulically designed standpipe systems
in fully sprinklered, non-highrise buildings shall be designed to provide the required waterflow
rate. A sign shall be provided at each landing, in all interior stairways, designating the floor level.
(2015 Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover
Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire
department connections shall be not less than three feet nor more than five feet in height above
finished grade. The fire marshal shall have the authority to require more stringent
requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)
25. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms. Dimensions of bollards. Bollards shall be a minimum of six-inch
diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36
inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The
bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any
deviation of the stated requirements must be approved by the fire marshal and/or chief building
inspector. The above dimensions shall serve as the requirement for installation; however the fire
marshal and/or chief building inspector shall have the authority to require more stringent
dimensions to fit the needs of devices warranting impact protection. Color of bollards. Bollards
should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or
have a reflective coating. Any deviation of the stated requirements must be approved by the fire
marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)
26. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
Page 74
with the following: One-family and two-family residential structures, height, the number shall measure a
minimum of four inches in height, location, the number shall be placed on the house above or to
the left or right of the front entrance, color, the number shall be contrasting to the background
color, Arabic numerals, all numbers shall be Arabic numerals. Multiple-family dwellings, measurements,
the number shall measure a minimum of six inches when identifying individual apartments with
exterior doors, and 12 inches when identifying buildings with apartment complexes where there
are two or more buildings not assigned street addresses. Individual buildings with street
addresses shall have numbers measuring six inches, location, numbers shall be placed either in the
center of the building or on the street end of the building so as to be visible from either the public
or private street or from the parking lot, color, numbers shall be contrasting to the background
color, Arabic numerals, all numbers used shall be Arabic numerals. Commercial, industrial and office
buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, property line or
driveway, should the building be located far enough from a public or private road so that the
numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building, color; each building, numbers shall
be contrasting to the background color and shall be placed on each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals, Shopping centers. Shopping centers
consisting of two or more stores shall have a tenant or suite number affixed to the front of the
tenant space and on the outside of the rear door which corresponds with that tenant space.
Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)
27. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system
that is monitored off-site, or any occupancy that contains an automatic sprinkler system. (2015
Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new
or existing building where a fire alarm or sprinkler system is being installed. It shall be the
responsibility of the owner or occupant to keep a set of keys in the secured key box that are
current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard
service shall be exempt from this subsection. Location. The secured key system shall be
located as close to the main entrance as possible. Should the building design not allow the
secured key system to be located by the main entrance, the fire marshal and fire chief shall
come to an agreement as to an alternate location for the key box. A secured key system, once
installed, shall not be obstructed from view or obstructed by any means that would delay
the fire department access to the box. Required keys. Keys to be secured in the key box shall
include keys to all points of ingress or egress, whether on the interior or exterior of the
building, and keys to locked mechanical rooms, electrical rooms, elevator rooms, fire alarm
and sprinkler controls and any area protected by automatic fire detection. Keys to individual
residential apartment units are not required. Ordering responsibility. It shall be the
responsibility of the general contractor to order the key box for new buildings. It shall be
the responsibility of the owner or tenant to order the key box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted
before the installation of a key box. (City Code of Ordinances 46-127)
28. All required means of egress shall have an exit discharge consisting of a non-slip surface, and
leading to and terminating at a public way.
Page 75
29. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position.
Where two or more new passenger elevators are located in a single hoist way and serve all or the
same portion of the building, only one elevator car that provides a car sized to accommodate an
ambulance cot 24 inches by 84 inches in its horizontal position for each hoist way shall be
required. Elevator cars required to comply with 15.1 or 15.2 shall be identified by the international
symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches
(76 mm) in height and shall be placed inside on both sides of the hoist way door frame.
Firefighter recall keys shall be provided in a manner acceptable to the local fire department.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
30. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO.
31. Project to be completed per approved Site Plan.
32. Full building and fire plan review is required.
33. Construction or renovations cannot be started until building plans are approved.
34. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire marshal’s Office. This work cannot be started until the permit is approved.
35. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
ADDITIONAL / SPECIFIC COMMENTS:
1. Fire Department Connection not shown on plans. To be located at front entrance with Fire
Hydrant
2. Fire lane markings not shown on plan.
3. Fire command center to be required.
4. Access to all buildings will be required during all phases of this project.
5. Clarification of underground fuel tank. Will it be removed?
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 76
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: November 1, 2017 T
===============================================================
APPLICATION: Delaware State University Residence Hall at 1200N. DuPont Highway
Master Plan
FILE#: S-17-29 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
This project will need to be submitted to DelDOT for formal review. An analysis of the
site will need to be completed to verify that the proposed increase in trips generated are
being adequately handled by the entrance. Additionally, concerns have been expressed in
regards to pedestrian improvements that may be needed along and near this site to handle
the large volume of foot traffic. An analysis should be looked into to see if the pedestrian
facilities are adequately accommodating the pedestrian traffic the site creates.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 77
DEPARTMENT OF NATURAL RESOURCES
AND ENVIRONMENTAL CONTROL
DIVISION OF WATERSHED STEWARDSHIP
89 KINGS HIGHWAY
DOVER, DELAWARE 19901
OFFICE OF THE PHONE: (302) 739-9921
DIRECTOR FAX: (302) 739-6724
Memorandum
DATE: October 30, 2017
TO: Dawn Melson-Williams, Principal Planner
City of Dover, Department of Planning & Inspections
FROM: Elaine Z. Webb, P.E., Engineer IV
Sediment & Stormwater Program
RE: Development Advisory Committee (DAC)
S-17-29 Delaware State University Residence Hall at 1200 N. DuPont Highway:
Master Plan
CC: Jamie Rutherford, Program Manager
Randy Greer, Engineer VI
J.D. Bartlett, Delaware State University
Gregg Moore, Becker Morgan Group
DNREC Sediment and Stormwater Program reviewed the site plan provided with the DAC
agenda. In addition, DNREC Sediment and Stormwater Program conducted a project application
meeting with representataives from Delaware State University and Becker Morgan Group on
Friday, October 27, 2017. The project application meeting discussion and agreement items
document is attached for reference.
A Sediment and Stormwater Management Plan must be approved by DNREC Sediment and
Stormwater Program prior to any land disturbance taking place on site. In addition a Notice of
Intent (NOI) for Stormwater Discharges Associated with Construction Activity must be
submitted with the $195 NOI fee prior to plan approval. It is anticipated that utility relocation in
advance of the full demolition and construction project will be approved through the Minor
Linear Utility Disturbances Standard Plan.
Stormwater will be managed through infiltration in a StormTech system sized to manage the
Sediment and Stormwater Program’s Resource Protection Event requirements in addition to the
City of Dover’s recharge requirements. Infiltration is feasible and an acceptable approach for
this project.
Management of the Conveyance and Flooding Events (10-year and 100-year) will be through
watershed location. The discharges from this project will be allowed to discharge directly to
Delaware’s good nature depends on you!
Page 78
Fork Branch at the upper end of Silver Lake because those discharges will far preceed the peak
of the watershed into Silver Lake.
Construction Site Stormwater Management controls will be implemented during construction to
prevent discharges of sediment and other pollutants.
If you should have any questions, please do not hesitate to contact me at (302) 739-9921 or
Elaine.Webb@state.de.us.
Page 79
Srrro or DnlawrRn
Exucurrvp Dnp¿,RrunNr
Opnrcn on Srnre Pl¿.NNrNc CooRorN¡,rroN
October 3,2017
Mr. David S. Hugg, III
Interim Planning Director, City of Dover
15 E. Loockerman Street
P.O. Box 475
Dover, DE 19903
RE: PLUS for the New Student Dormitory within Delaware State University
Dear Mr
D¡e"'þ
I am writing to inform you that I have waived the PLUS process for the above referenced project
pursuant to your request.
The new dormitory project will replace two existing outdated dormitories, which will be
demolished. The Delaware State University is a fully developed campus with infrastructure in
place to support the new building.
It is also noted that the City of Dover's Development Advisory Committee provides a more
stringent review process than is offered through PLUS. I am confident that all of the relevant
State agencies will be included in the review of this dormitory project.
This waiver has been granted at my discretion according to the provisions of Title 29, Chapter
92, S 9205 of the Delaware Code. Please do not hesitate to contact me if I can be of any further
assistance.
AICP
Director
Office of State Planning Coordination
122 William Penn Street .Third Floor. Dover, DE 1990L
Phone (302)739-3090 . Fax (302) 739-5661.. www. stateplanning.delaware.gov
Page 80
@ity of Þober
September 29,2017
Constance Holland, AICP
Director, Office of State Planning Coordination
Dover DE
Via Email: connie.holland@state.de.us and david.edeell@state.de.us
RE Request for Waiver of PLUS Review
Delaware State University: On-Campus New Student Dormitory Project
Dear Connie:
The City of Dover Planning Office recently met with representatives of Delaware State
University and the Becker Morgan Group regarding an on-campus new Student Dormitory
project. This is a public-private partnership effort to improve campus housing options for
students. The project anticipates filing a Site Development Plan application on Friday, October 6,
2017 in order for the Plan to be scheduled to be heard at the Planning Commission meeting on
November 20,2017 .
The proposed project would meet the threshold for PLUS review; however, the City believes that
it is not necessary to submit the proposal for PLUS Review process.
l. The project location is internal to the campus of Delaware State University where the
area is fully developed with infrastructure in place to support the buildings. This is
essentially an infill project on the existing campus.
2. The construction will ultimately replace two existing dormitory facilities (Lydia P. Laws
Hall and Harriet Tubman Hall) with a modern dormitory facility built to current building
code standards.
3. The Site Development Plan will be reviewed through the City of Dover's Development
Advisory Committee (D.A.C.), which includes DNREC and DelDOT. The City works
very close with these departments on development projects. As the Delaware State
University campus is located within an Excellent Recharge Area, the City will work to
ensure that the requirements of the SWPOZ (Source Water Protection Overlay Zone) will
be addressed through the Sediment and Stormwater Management Plan, which will be
reviewed and ultimately approved by DNREC. The applicant has already indicated their
intent to proactively discuss the project with these agencies.
Attached to this letter is a copy of a letter and information on the proposed project requesting a
determination that a Waiver from standard review is available, as identified in the Memorandum
of Understanding for the Preliminary Land Use Services (PLUS). I feel that a waiver appropriate
given the location of the project internally to the campus and its proposalto replace existing
campus facilities.
If there is potential for such a waiver, I support your consideration of this request. As always, I
am available to discuss, please contact the Planning Office at (302)736-7196.
P. O. Box 475 Dover, DE 19903
Page 81
Letter Re: Request for PLUS Waiver for Delaware State University On-Campus Student Housing Project
September 29,2017
Page2 of2
Sincerely,
David S. Hugg, III, Interim Planning Director
City of Dover, Delaware
DSH/demw
CC via Email:
David Edgell, AICP, Office of State Planning Coordination
Dawn Melson-Williams, AICP, Principal Planner
Gregory V. Moore, P.E. Becker Morgan Group gmoore@beckermorgan.com
J.D. Bartlett, Delaware State University ibartlett@desu.edu
MichaelCipriano, American Campus Communities mcipriano@americancampus.com
Page 82
September 12,2017
ARCHITICTURI
ENGTNE!RING Mr. David Hugg,lll
City of Dover
P.O. Box 475
Dover, DE 19903-0475
PL\NNING OUR
RE DELAWARE STATE UNIVERSITY
CLIE¡üfs' SuccESS Dover, Delaware
2017185.00
Dear Mr. Hugg:
I am writing on behalf of Delaware State University as it relates to a new student dormitory
proposed for the campus. I am attaching concepts of the new building addition which details
location of the new building and demolition of existing. The plan is to demolish two (2) existing
outdated facilities, Lydia P. Laws Hall and Harriet Tubman Hall, and replace them with a new
modem dormitory located in the same location as the existing. We are hereby requesting the
PLUS process be waived for this project due to the following:
1. The Delaware State University is a fully developed campus with infrastructure in place to
support the new building; recent projects include the Oscar Building.
2. The new building is located on the site where two (2) existing dorms will be demolished
Lydia P. Laws Hall and Harriet Tubman Hall will berazed as neither have air
conditioning nor meet cunent building code standards.
3. The city uses an advanced Development Advisory Committee (DAC), and provides a
more stringent review process than PLUS offers and includes additional affected agencies
like local school districts and Dover Air Force Base along with state and city agencies.
4. Delaware State University and Becker Morgan Group, Inc. will be meeting with
DelDOT, DNREC, and all affected city agencies to discuss requirements for the building
prior to submission to the City of Dover.
BECKER MoRGAN GRoUP, INC.
We plan on making site plan submission to the city on October 6th to facilitate a November 20th
ARCH ITECTURE & Ë,NGINEERING
Planning Commission Public Hearing. Please advise.
3o9 SomH GovERNoRs AVENUE
DovER, DEhwÀRE 19904 Thank you for your cooperation. We look forward to hearing ftom you.
3o2.734.7950
F!d.3o2.T94.7965
Sincerely,
RlrrENHousE STATIoN
25o SourH MArN STREET, Su[E 1o9
BECKER n¿o#eN GRouP , [NC.
(t^^
NEWARK, DELAShRE 19Z1r
3o2A69SZoo
PoRl ExcHANcE
912 WESTMATN SÎREm, SunE 3oo
SALISBURY, MARYIAND 218o1 Moore, P.E
410.546.9too Vice President
F.Ax 41o.546.s824
ARcHITECTURE & PI,ANNING GVM/rlh
g2oS RÀND.{LL PAR(wAY, SurrE 21r
WILMINSTON, NoR'tï CAROUNA 28403 Cc: J.D. Bartlett, Delaware State University fibartlett@desu.edu)
9ro.34t.76oo Michael Cipriano, American Campus Communities (mcipriano@americancampus.com)
FAx 910.341.7S06
www.beckermorgan.com 20 I 7 I 8500ad-ltr-COD.doc
Page 83
Development Approach
Project Phasing
Ç
Page 84
PETITION TO AMEND ZONING ORDINANCE TEXT
Report to the
Dover Planning Commission
November 20, 2017
Proposed Changes: Text Amendments to the following:
Zoning Ordinance, Article 3 – District Regulations
o Section 1 – One-family residence zones
o Section 10 – Institutional and office zone
Zoning Ordinance, Article 5 -Supplementary Regulations
o Section 14 – Child Day Care Facilities (edits)
o Section 22 – Adult Day Care Facilities (new section)
Zoning Ordinance, Article 12 - Definitions.
Summary of Amendment: The proposed amendment establishes provisions for Adult Day
Care facilities allowing them to be permitted in any zoning district
provided that State licensing and City code requirements have been
met. Other amendments update references and definitions to make
distinction between Child Day Care facilities and Adult Day Care
facilities.
Key features of the Provisions:
Identifies a distinction between child day care facilities and
adult day care facilities
Defines adult day care facilities, small adult day care
facility, and large adult day care facility
Establishes the review processes for each type of facility
depending on zoning of the subject property
Establishes requirements for parking, signage, and
licensing
Adds allowances for after school care of children in Family
Day Care Home – Children and Large Family Day Care
Home - Children
Process: The Legislative, Finance, and Administration Committee reviewed
the proposed Text Amendments on September 25, 2017 and the
First Reading on October 9, 2017. A Public Hearing before the
Planning Commission is scheduled for November 20, 2017 and a
Public hearing and Final Reading before City Council is scheduled
for December 11, 2017.
Ordinance Number: Proposed Ordinance #2017-13
File Number: MI-17-03
Page 85
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOVEMBER 1, 2017
APPLICATION: Text Amendments: Adult Day Care Facilities
FILE #: MI-17-03
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: ELECTRIC - 302-736-7070 PUBLIC WORKS – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. No objections to proposed amendments.
WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. Our office has no objections to the proposed text amendments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT
P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 86
C F
MI-17-03 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: November 1, 2017 D S
O H
V A
E L
R
APPLICATION: Text Amendments: Adult Day Care
FILE #: MI-17-03 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Matthew Brown, Deputy Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. No objections.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 87
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: November 1, 2017 T
===============================================================
APPLICATION: Text Amendment: Adult Day Care Facilities
FILE#: MI-17-03 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no advisory comments at this time.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 88
FIRST READING
CITY OF DOVER ORDINANCE #2017-13
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3
4 That Appendix B – Zoning, Article 3 – District Regulations, Section 1 – One-Family Residence Zones,
5 of the Dover Code be amended by inserting the text indicated in bold, blue font as follows:
6
7 ARTICLE 3. - DISTRICT REGULATIONS
8
9 Section 1. - One-family residence zones [(R-20, R-15, R-10, R-8 and R-7)].
10 (R-20, R-15, R-10, R-8, R-7.) (See also article 5, Supplementary Regulations; and article 6, Off-Street
11 Parking, Driveways and Loading Facilities.)
12 1.1 Uses permitted. In a one-family residence R-20, R-15, R-10, R-8 and R-7 zones, no building or
13 premises shall be used and no building or part of a building shall be erected or altered which is
14 arranged, intended or designed to be used, in whole or in part, for any uses except the following:
15 1.11 The raising of field and garden crops, vineyards and orchard farming, the maintenance of
16 nurseries, and the seasonal sale of the products thereof, provided no building is erected and
17 signs conform with article 5, section 4.
18 1.12 One-family detached dwellings, not to exceed one such dwelling per lot.
19 1.13 Public buildings, structures and uses, including parks and playgrounds, subject to
20 approval of site plans by the planning commission in accordance with article 10, section 2.
21 1.14 The following uses are permitted, conditional upon the approval of the planning
22 commission in accordance with the procedures and subject to the general conditions set forth in
23 section 10.1 and to any specified requirements set forth below:
24 (a) Places of worship, including parish houses; [and] schools, including nursery schools,
25 kindergartens and day care centers in accordance with article 5, Supplementary
26 Regulations, section 14. Child Dday care facilities; philanthropic and eleemosynary
27 institutions; hospitals and sanitariums for general medical care; and funeral homes
28 subject to the following requirements:
29 i. Any school permitted under this paragraph [subsection 1.14(a)] shall be a
30 nonprofit organization within the meaning of the Internal Revenue Act and shall
31 be registered effectively as such thereunder.
32 ii. Any school permitted under this paragraph [subsection 1.14(a)], other than a
33 kindergarten, nursery school, or day care center, shall occupy a lot with an area of
34 not less than two acres, plus one acre for each 100 pupils for which the building is
35 designed.
36 iii. Any kindergarten or nursery school permitted under this paragraph [subsection
37 1.14(a)] shall be limited to a maximum of 50 children in zones R-8 thru R-20 and
38 a maximum of 100 children in all other zones. At least 100 square feet of outdoor
39 play space per child shall be provided. Outdoor play space shall be fenced or
40 otherwise enclosed on all sides and shall not include driveways, parking areas, or
41 land unsuited by other usage or natural features for children's active play space.
Page 89
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 2
42 Fencing or other enclosures shall be a minimum height of four feet. The minimum
43 lot area for each ten, or remainder over the multiple of ten, children shall be the
44 same as the minimum lot area requirement for each dwelling unit in the districts
45 in which such uses are to be located.
46 iv. No such building or part thereof shall be erected with less than a 50-foot front
47 yard or nearer than 25 feet from any other street or property line.
48 v. The sum of all areas covered by all principal and accessory buildings shall not
49 exceed 20 percent of the area of the lot.
50 vi. Courts shall conform to the requirements of article 5, section 3 hereof.
51 (b) Railroad and public utility rights-of-way and structures necessary to serve areas
52 within the city, subject to such conditions as the planning commission may impose in
53 order to protect and promote the health and safety and general welfare of the
54 community and the character of the neighborhood in which the proposed structure is to
55 be constructed.
56 (c) Country clubs or other annual membership clubs, catering exclusively to members
57 and their guests, and accessory private playgrounds, golf courses, swimming pools,
58 tennis courts and recreation buildings not conducted as business enterprises, provided
59 that the following operations shall be prohibited:
60 i. Outdoor entertainment, live or mechanical;
61 ii. The use of outdoor public address systems for any purpose; and
62 iii. Exterior lighting producing glare at the lot line other than that essential for the
63 safety of the users of the premises.
64 No building erected under the provisions of this paragraph [subsection 1.14(c)] shall
65 be so erected nearer than 50 feet to any street or property line.
66 (d) Adult day care facilities in accordance with Article 5 – Supplementary
67 Regulations, Section 22 – Adult Day Care Facilities.
68
69 1.15 Accessory uses, limited to the following:
70 (a) Professional office or studio of an artist, dentist, musician, teacher, or physician, but
71 not including veterinarians, provided that:
72 i. Such office or studio is incidental to the residential use of the premises and is
73 carried on by a resident thereon with not more than one nonresident assistant; and
74 ii. Such office or studio shall occupy not more than 30 percent of the area of one
75 floor of the main building.
76 iii. Studios where dancing or music instruction is offered to groups in excess of four
77 pupils at one time or where concerts or recitals are held are prohibited.
78 iv. Medical centers, barbershops, beauty parlors, real estate offices, funeral homes
79 or similar uses shall not be considered permitted accessory uses.
Page 90
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 3
80 (b) Garden house, tool house, playhouse, greenhouse or pool incidental to the residential
81 use of the premises and not operated for gain.
82 (c) Private garage, provided that, in the case of a one-family dwelling, such garage shall
83 have a capacity of not more than three passenger automobiles. One such space may be
84 leased to a person not [a] resident on the premises.
85 (d) Keeping domestic animals as pets, provided not more than three (3) dogs over six
86 months old, shall be permitted.
87 (e) Keeping of chickens for individual domestic purposes subject to the following
88 restrictions:
89 i. Keeping of chickens shall not be permitted on lots smaller than 10,890 square feet
90 in lot area.
91 ii. No more than five (5) chickens shall be permitted on a residential lot.
92 iii. Chickens shall be registered with the Delaware Department of Agriculture.
93 iv. Chickens shall be penned in a coop that shall be at least four (4) square feet per
94 chicken.
95 v. All chicken coops shall be located in a rear yard and shall be a minimum of 20
96 feet from side and rear property lines.
97 vi. Any odor associated with the chickens shall not be discernable from property
98 lines.
99 vii. Keeping of roosters shall be prohibited.
100 viii. Any lot with chickens shall either comply with these requirements by June 1,
101 2016 or remove the chickens.
102 (f) Dormitories accessory to schools, provided that such dormitories conform to the bulk
103 regulations of the RG-1 zone. For purposes of computing bulk requirements, each four
104 rooms shall be considered one dwelling unit. Parking shall be calculated as identified
105 in Article 6—Off-Street Parking, Section 3—Required off-street parking spaces,
106 Paragraph 3.1—Schedule of requirements.
107 (g) Customary home occupations, provided that:
108 i. No display of products, goods and/or signs shall be visible from the street.
109 ii. Such home occupation shall be incidental and secondary to the residential use of
110 the premises and shall be conducted in the principal building by the resident or
111 residents that reside therein.
112 iii. Nonresident assistants or co-workers shall be prohibited.
113 iv. Such home occupation shall not occupy more than 30 percent of the area of one
114 floor in the principal building.
115 v. There shall be no exterior effect such as noise, traffic, odor, dust, smoke, gas,
116 fumes, radiation, or electromagnetic interference.
Page 91
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 4
117 1.16 [1.2] Site development plan approval. Site development plan approval in accordance with
118 article 10, section 2 hereof shall be required prior to the issuance of building permits for the erection
119 or enlargement of all structures and related accessory structures. Such approval shall also be
120 required prior to the issuance of certificates of occupancy for a change of use.
121 1.17 [1.3] Performance standards. All uses are subject to performance standards as set forth in
122 article 5, section 8.1.
123 1.18 [1.4] [ Closed zone. ] Zone R-7 is a closed zone in accordance with article 10, section 5.19.
124 1.19 [1.5] [ Signs. ] Signs shall meet the regulations found in article 5, section 4, supplementary
125 sign regulations.
126 (Ord. of 1-8-1979; Ord. of 5-14-1990; Ord. of 12-14-1992(2); Ord. of 7-10-2000; Ord. of 2-12-2001;
127 Ord. No. 2009-12, 9-14-2009; Ord. No. 2011-21, 10-10-2011; Ord. No. 2016-01, 4-11-2016 )
128 BE IT FURTHER ORDAINED:
129 That Appendix B – Zoning, Article 3 – District Regulations, Section 10 – Institutional and Office Zone
130 of the Dover Code be amended by inserting the text indicated in bold, blue font and deleting the text
131 indicated in red strikeout as follows:
132
133 Section 10. - Institutional and office zone (IO).
134
135 10.1 Uses permitted. In an institutional and office zone (IO), no building or premises shall be used,
136 and no building or part of a building shall be erected, which is arranged, intended, or designed to be
137 used, in whole or in part, for any purpose, except the following:
138 (a) Business, professional, or governmental offices.
139 (b) Banks.
140 (c) Research, design, and development laboratories.
141 (d) Public and institutional uses including hospitals, medical clinics, libraries, police stations,
142 courthouses, transit centers, schools, colleges, universities, places of public assembly,
143 philanthropic and charitable institutions, parks, playgrounds, public indoor recreation
144 centers, athletic fields.
145 (e) Public utility rights-of-way and structures necessary to serve areas within the city.
146 (f) Child Dday care centers, provided they are established in accordance with all applicable
147 state regulations pertaining to child care and provided that they are established and
148 maintained in accordance with article 5, section 14 of this ordinance.
149 (g) Emergency shelters and transitional housing.
150 (h) Adult day care facilities provided they are established in accordance with all
151 applicable state regulations pertaining to adult care and provided that they are
152 established and maintained in accordance with article 5, section 22 of this ordinance.
Page 92
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 5
153 10.2 Conditional uses. The following uses are permitted, conditional upon the approval of the
154 planning commission in accordance with the procedures and subject to the general conditions set
155 forth in article 10, section 1:
156 (a) Firearm ranges, prisons, and correctional facilities.
157 (b) Public incinerators.
158 (c) Hotels and restaurants.
159 10.3 Accessory uses. The following uses shall be permitted accessory to other permitted uses on a
160 lot.
161 (a) Clinics, cafeterias, and recreational facilities.
162 (b) Motor vehicle storage and repair facilities accessory to a public or institutional use.
163 (c) Restaurants that are on a campus and intended to support users of the campus.
164 10.4 Uses prohibited. The following uses are prohibited:
165 (a) Landfills, dumps.
166 10.5 Enclosed buildings. All permitted uses and all storage accessory thereto, other than offstreet
167 parking, shall be carried on in buildings fully enclosed on all sides, except for outdoor eating areas
168 associated with restaurants approved by the city planner.
169 10.6 Performance standards. All uses are subject to performance standards as set forth in article 5,
170 section 8.1.
171 10.7 Site development plan approval. Site development plan approval in accordance with article
172 10, section 2 hereof shall be required prior to the issuance of building permits for the erection or
173 enlargement of all structures and prior to the issuance of certificates of occupancy for any change of
174 use.
175 (Ord. of 10-24-1983; Ord. of 12-14-1992; Ord. of 7-12-1993, § 7; Ord. of 4-25-1994; Ord. of 10-12-
176 1998; Ord. of 7-10-2000; Ord. of 2-12-2001; Ord. of 4-23-2007(1); Ord. of 4-23-2007(2); Ord. No.
177 2014-08, 7-14-2014 )
178
179 BE IT FURTHER ORDAINED:
180
181 That Appendix B – Zoning, Article 5 –Supplementary Regulations, Section 14 – Day Care Facilities of
182 the Dover Code be amended by inserting the text indicated in bold, blue font and deleting the text
183 indicated in red strikeout as follows:
184
185 Section 14. -– Child Dday care facilities.
186
187 14.1 General. In order to promote the development of quality child care outside of the home (day care
188 facilities), the following two basic assumptions have been made:
189
190 14.11 The establishment of child day care services and facilities, wherever there is a need, is a
Page 93
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 6
191 necessary public objective; and
192
193 14.12 Day care programs for children shall be treated as community facilities and shall be
194 permitted to locate in any zoning district, provided that need has been demonstrated, state
195 licensing requirements have been met and no physical hazard to children can be reasonably
196 anticipated.
197
198 14.2 Definitions.
199
200 Child Dday care facility. For the purposes of this ordinance, the facilities described furnishing
201 care, supervision and guidance of a child or group of children unaccompanied by a parent or
202 guardian, for periods of less than 24 hours per day shall be defined as follows:
203
204 14.21 Child Dday care center.
205
206 (a) Any place, other than an occupied residence, which receives children for
207 compensation for day care or large family day care home; and
208
209 (b) Any occupied residence which receives 13 or more children for compensation for
210 day care.
211
212 Child Dday care centers shall be required to obtain conditional use approval by the planning
213 commission in accordance with the procedures and subject to the general conditions set forth in
214 article 10 and to any specified requirement set forth in subsection 14.3 below, except in zoning
215 districts where listed as a permitted use.
216
217 14.22 Family day care home-children. An occupied residence in which a person provides care
218 for children other than his/her own family and the children of close relatives for compensation.
219 Such care in a family day care home is limited to that care given to six or fewer children with a
220 maximum of three children allowed for after school care. Such child care facility shall be
221 permitted as an accessory use in all residential zones and shall be exempt from obtaining a
222 conditional use permit and site plan approval.
223
224 14.23 Large family day care home-children . A facility which provides child care for more than
225 six, but less than 13 children with a maximum of three children allowed for after school care.
226 This care may be offered in a private home or in a property converted to the purpose of providing
227 child day care. This form of day care facility requires the submission of a site plan application in
228 accordance with the procedures and subject to article 10, section 2 of the zoning ordinance. If a
229 large family day care home is not to be located in an occupied residence, then a conditional use
230 site plan application shall be required in accordance with article 10 section 1 of the zoning
231 ordinance.
232
233 14.3 Zoning criteria.
234
235 14.31 Number of children. Day care centers shall be limited to a maximum of 50 children in all
236 residential zones.
Page 94
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 7
237
238 14.32 Outdoor play area. Must meet the state requirement for day care centers.
239
240 14.33 Off-street parking/loading. One space per each adult attendant, plus one space for every
241 ten children.
242
243 14.34 Signs in all residential zones. Signage shall be limited as follows:Signage for child day
244 care facilities
245
246 (a) Signs in residential zones.
247
248 (a) i. Family day care homes-children and large family day care homes-children. One
249 wall-mounted sign limited to two square feet.
250
251 (b) ii. Child Dday care center. One sign, wall-mounted or freestanding, limited in area
252 to 12 square feet. The planning commission shall consider the location of such sign as part of the
253 conditional use review and may approve a lesser amount of sign area if deemed necessary by the
254 commission to protect the general health, safety and welfare of the public in general and the residents of
255 the immediate neighborhood in particular.
256
257 (b) Signs in nonresidential zones. Child Dday care centers within nonresidential zoning
258 districts shall be governed by the sign regulations in effect for the particular
259 nonresidential zoning district in which the day care center is located.
260
261 14.35 Licensing requirements. Child Dday care facilities must meet state licensing standards,
262 and a license from the state shall be submitted to the department of planning and inspections
263 prior to the issuance of and must be inspected by the City of Dover Fire Marshal’s Office.
264 aA City of Dover Business License and a Public Occupancy Permit is required.
265
266 (Ord. of 5-14-1990; Ord. of 4-25-1994; Ord. of 4-23-2007(3))
267
268 Editor's note— The subsections of this section have been numbered by the editor to retain format.
269
270 BE IT FURTHER ORDAINED:
271
272 That Appendix B – Zoning, Article 5 –Supplementary Regulations of the Dover Code be amended by
273 inserting a new Section 22 – Adult Day Care Facilities, as follows:
274
275 Section 22. – Adult day care facilities
276 Adult day care facilities shall be permitted to locate in any zoning district provided that state
277 licensing requirements have been met and such facilities are subject to the following
278 requirements:
279
280 22.1 Definitions
Page 95
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 8
281 Adult day care facilities apply to any program that provides health, social and related support
282 services for four or more functionally impaired adults who requires supervision due to
283 cognitive or physical impairment or who cannot independently perform one or more activities
284 of daily living. These services are provided to adults for a period of less than 12 hours during
285 the day and are provided in a setting other than a participant’s home or the residence of the
286 facility operator.
287 Small adult day care facility. A facility that provides services for four adult participants but
288 less than 16 adult participants.
289 Large adult day care facility. A facility that provides services for 16 or more adult participants.
290 22.2 Review Process
291 (a) Adult day care facilities are permitted as accessory uses to existing facilities that provide
292 services to adult participants.
293 (b) Residential zones. A conditional use site plan application shall be required in accordance
294 with Appendix B-Zoning, Article 10-Planning Commission section 1 for adult day care
295 facilities in residential zones.
296 (c) Non-residential zones.
297 i. Site development plan approval in accordance with Appendix B-Zoning, article 10,
298 section 2 hereof shall be required for small adult day care facilities.
299 ii. A conditional use site plan application shall be required in accordance with
300 Appendix B-Zoning, article 10 section 1 for large adult day care facilities.
301 22.3 Zoning criteria
302 22.31 Off-street parking. One space per each adult attendant, plus one space for every four
303 adult participants.
304 22.32 Signage for adult day care facilities
305 (a) Signage in a residential zone. One sign, wall-mounted or freestanding, limited in
306 area to 12 square feet. The planning commission shall consider the location of such
307 sign as part of the conditional use review and may approve a lesser amount of sign
308 area if deemed necessary by the commission to protect the general health, safety and
309 welfare of the public in general and the residents of the immediate neighborhood in
310 particular.
311
312 (b) Signs in nonresidential zones. Adult day care facilities within nonresidential zoning
313 districts shall be governed by the sign regulations in effect for the particular
314 nonresidential zoning district in which the day care facility is located.
Page 96
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 9
315 22.33 Licensing requirements. Adult day care facilities must meet state licensing standards
316 and must be inspected by the City of Dover Fire Marshal’s Office. A City of Dover Business
317 License and a Public Occupancy Permit are required.
318 BE IT FURTHER ORDAINED:
319
320 That Appendix B - Zoning, Article 12 – Definitions of the Dover Code be amended by inserting the
321 following new definition in its correct alphabetical order:
322
323 Adult day care facilities: Apply to any program that provides health, social and related support
324 services for four or more functionally impaired adults who require supervision due to cognitive or
325 physical impairment or who cannot independently perform one or more activities of daily living.
326 These services are provided to adults for a period of less than 12 hours during the day and are
327 provided in a setting other than a participant’s home or the residence of the facility operator.
328
329 (a) Small adult day care facility: A facility that provides services for four adult
330 participants but less than 16 adult participants.
331 (b) Large adult day care facility: A facility that provides services for 16 or more adult
332 participants.
333
334 BE IT FURTHER ORDAINED:
335
336 That Appendix B - Zoning, Article 12 – Definitions – Day care facility of the Dover Code be amended
337 by inserting the text indicated in bold, blue font and deleting the text indicated in red strikeout as
338 follows:
339
340 Day care facility: For the purposes of this ordinance, the facilities described furnishing care, supervision and
341 guidance of a child or group of children unaccompanied by [a] parent or guardian for periods of less than 24
342 hours per day shall be defined as follows:
343 Child Dday care facility: For the purposes of this ordinance, the facilities described furnishing care,
344 supervision and guidance of a child or group of children unaccompanied by a parent or guardian for periods of less
345 than 24 hours per day shall be defined as follows:
346 (a) Child Dday care center:
347 i. Any place, other than an occupied residence, which receives children for day care or large family
348 day care home; and
349 ii. Any place, including an occupied residence, which receives 13 or more children for day care.
350
351 (b) Family day care home-children: An occupied residence in which a person provides day care for children
352 other than his/her own family and the children of close relatives. Such care in a family day care home is
353 limited to that care given to six or fewer children with a maximum of three children allowed for after
354 school care. Such child care shall be permitted as an accessory use in all residential zones and shall be
355 exempt from obtaining a conditional use permit and site plan approval.
356
357 (c) Large family day care home-children: A facility which provides child care for more than six, but less
358 than 13 children with a maximum of three children allowed for after school care. This care may be
359 offered in a private home or in a property converted to the purpose of providing child day care.
Page 97
Proposed Ordinance #2017-13-Appendix B–Zoning, Art. 3–District Regulations
Page | 10
360 ADOPTED: *
361
362
363
364 SYNOPSIS
365 The proposed ordinance Article 5 section 22 will be a new section added to the Zoning Ordinance to
366 allow Adult day care facilities to be permitted in any zoning district provided that state licensing and
367 city code requirements have been met. The proposed amendment under Article 5 section 14 of the
368 Zoning Ordinance are revisions to the existing ordinance that identifies Child day care facilities. Other
369 amendments revise references and definitions pertaining to these uses.
370
371 (SPONSORS: NEIL AND HUGG)
372
373
374 Actions History:
375 10/09/17 - Scheduled for First Reading – City Council