Page 1
CITY OF DOVER PLANNING COMMISSION
AGENDA
Tuesday, February 20, 2018 – 7:00 P.M.
City Hall, City Council Chambers
15 Loockerman Plaza, Dover, Delaware
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF AGENDA
ADOPTION OF MINUTES OF REGULAR MEETING of December 18, 2017
COMMUNICATIONS & REPORTS
1) Reminder: The next Planning Commission regular meeting is scheduled for MONDAY, March
19, 2018 at 7:00pm in the City Council Chambers.
2) Notice: The Planning Commission Quarterly Workshop scheduled in February 2018 has been
canceled.
3) Update on City Council Actions
4) Update from Planning Office
a. Educational and Training Opportunities
OPENING REMARKS CONCERNING APPLICATIONS
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval: None
2) Revisions to Applications:
A. S-17-29 Delaware State University Residence Hall at 1200 N. DuPont Highway: Master
Plan – Update on Revisions to Site Plan and Building Architecture associated with the
Site Development Master Plan application for the Residence Hall project approved by the
Planning Commission on November 20, 2017. The Site Development Master Plan has
been Revised to consist of a new 192,141 S.F. five-story Student Residence Hall of 620
Beds (increased from 600 Beds and including refinement of building footprint with
increase in building size) and architectural changes to exterior finishes. The project
phases consist of the following: Phase 1- Relocation of Utilities, Phase 2 - Construction
of Residence Hall and Demolition of Laws Hall, and Phase 3 - Demolition of Tubman
Hall. The subject project area is internal to the Delaware State University Campus of
287.32 +/- acres. The property is zoned IO (Institutional and Office Zone) and subject to
the SWPOZ (Source Water Protection Overlay Zone) – Tier 3: Excellent Recharge Area.
The campus is location west of North DuPont Highway and north of College Road. The
owner of record is State of Delaware c/o Delaware State University. Property Address:
1200 North DuPont Highway. Tax Parcels: ED-05-057.00-01-19.00-000, ED-05-057.00-
01-20.00-000, and ED-05-057.00-01-21.00-000. Council District 4. The associated
Administrative Site Plans are S-17-31 Phase 1, S-17-33 Phase 2, and S-17-34 Phase 3.
Page 2
City of Dover Planning Commission Agenda
Public Hearing: February 20, 2018
Page 2 of 3
NEW APPLICATIONS
1) C-18-01 Governors Café Kitchen Addition at 144 Kings Highway SW – Public Hearing and
Review of Conditional Use Site Plan Application to permit the construction of a one-story, 344
SF addition to the kitchen for the Governors Cafe. The Governors Café is located within the
existing building at 144 Kings Highway SW. The property consists of 0.7419 +/- acres and is
located at the southernmost intersection of American Avenue and Kings Highway. The property
is zoned RG-O (General Residence and Office Zone) and is subject to the H (Historic District
Zone). The owner of record is Cahall Properties, LLC. Address: 144 Kings Highway SW. Tax
Parcel: ED-05-077.05-04-40.00-000. Council District 2. Application HI-17-04 was reviewed by
the Historic District Commission on December 21, 2017.
2) S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street – Public Hearing and
Review of a Site Development Plan Application to permit construction of a two-story, 71,775 SF
office and warehouse complex and adjoining parking spaces. The property consists of a 5.01 +/-
acres and is located on the north side of North Street, east of Mifflin Road and west of
Commerce Way. The property is zoned IPM (Industrial Park and Manufacturing Zone). The
submission is subject to Review of a Performance Standards Review Application. The owner of
record is DGKP North Street LLC. Address: 1351 West North Street. Tax Parcel: ED-05-076.14-
01-07.00-000. Council District 1. Waivers Requested: Elimination of Opaque Barrier (Opaque
Component) and Partial Elimination of Upright Curbing. Consideration of Performance
Standards Review Application.
3) SB-18-01 Minor Subdivision Plan for 747 North DuPont Highway – Public Hearing and Review
of a Minor Subdivision Plan application to permit the subdivision of a 25.01 +/- acre parcel into:
Lot 1 of 10.007 acres and Lot 2 of 15.004 acres. The property is located on the northeast side of
North DuPont Highway and south of Leipsic Road. The property is zoned SC-2 (Community
Shopping Center: Shopping Center Development Zone) and subject to the SWPOZ (Source
Water Protection Overlay Zone – Tier 3: Excellent Recharge Area). The owner of record is
Rojan DD 15 LLC. Property Addresses: 747 North DuPont Highway. Tax Parcel: ED-05-068.05-
01-15.00-000. Council District 3.
4) MI-18-01 Text Amendments: Zoning Ordinance, Article 3 Section 28 for Fuel Pumps as
Conditional Use in TND zone - Public Hearing and Review for Recommendation to City
Council on Text Amendments to the Appendix B: Zoning Ordinance, Article 3 – District
Regulations. The proposed Ordinance is to amend Section 28 - Traditional Neighborhood Design
Zone (TND), Subsection 28.52 – Neighborhood Commercial District. The proposed text revision
seeks to allow fuel pumps as Conditional Use as accessory to a convenience retail store and
subject to the requirements of Article 10, Section 1 – Approval of Conditional Uses. Ordinance
#2017-16. The City Council Public Hearing on this Text Amendment request is scheduled for
March 12, 2018.
A copy of the Proposed Ordinance #2017-16 is available on the City’s website
www.cityofdover.com under the Government Heading: Ordinances, Resolutions &
Tributes. https://www.cityofdover.com/ordinances-and-resolutions
The Legislative, Finance, and Administration Committee reviewed the proposed Text
Amendments on December 12, 2017 and the First Reading before City Council
occurred on January 8, 2018. The Public Hearing before the Planning Commission is
set for February 20, 2018 and Public Hearing and Final Reading before City Council
is on March 12, 2018.
Page 3
City of Dover Planning Commission Agenda
Public Hearing: February 20, 2018
Page 3 of 3
NEW BUSINESS
1) S-17-28 Multiplex at 299 College Road: Review of Cash-in-lieu of Active Recreation Area
Payment – Review of the payment amount for Cash-in-lieu of Active Recreation Area
construction as associated with the Site Development Plan to permit construction of a three
(3) unit multiplex residential building (multi-family dwelling) with adjoining parking spaces.
The property consists of a 18,244 S.F. +/- parcel (0.42 +/- acres) and is zoned RM-2
(Medium Density Residence Zone). The property is located on the northwest side of College
Road and adjacent to Conwell Street. The owner of record is Stephen E. Lumor (Enyam,
LLC). Property Address: 299 College Road. Tax Parcel: ED-05-067.00-02-26.00-000.
Council District 4. Cash-in-lieu amount of $4,000 was accepted by the Parks, Recreation &
Community Enhancement Committee on December 12, 2017 and by City Council on January
8, 2018.
2) Update on Appointment of the Architectural Review Oversight Subcommittee of Planning
Commission (in accordance with Zoning Ordinance, Article 10 §2.28)
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Posted Agenda: February 9, 2018
Page 4
CITY OF DOVER PLANNING COMMISSION
DECEMBER 18, 2017
The Regular Meeting of the City of Dover Planning Commission was held on Monday,
December 18, 2017 at 7:00 PM in the City Hall Council Chambers with Chairman Mr. Tolbert
presiding. Members present were Mr. Holden, Mr. Roach, Ms. Edwards, Mr. Holt, Mr. Baldwin,
Dr. Jones, Mrs. Welsh, Ms. Maucher and Mr. Tolbert.
Staff members present were Mr. Dave Hugg, Mrs. Dawn Melson-Williams, Mr. Eddie Diaz, Mr.
Jason Lyon and Mrs. Kristen Mullaney. Also present were Mr. Mark Strickland, Mr. Mark
Parker and Mrs. Kim Diehl.
APPROVAL OF AGENDA
Mr. Holt moved to approve the agenda as submitted, seconded by Mrs. Welsh and the motion
was unanimously carried 9-0.
Mrs. Melson-Williams stated that she just wanted to make sure that the members of the audience
are aware that the Conditional Use Application C-17-06 Pride of Dover Elks Lodge at 217 North
Kirkwood Street will not be heard this evening by the Planning Commission at the request of the
applicant. The applicant wished to defer consideration of that application. The application and
it’s public hearing will be rescheduled for a future meeting of the Planning Commission and
there will have to be public notice completed again for that specific meeting. There may have
been some members of the public that saw the initial public notice for the hearing on that
application that was at one point scheduled to be heard this evening.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF
NOVEMBER 20, 2017
Mrs. Welsh moved to approve the Planning Commission Meeting minutes of November 20, 2017,
seconded by Mr. Baldwin and the motion was unanimously carried 9-0.
COMMUNICATIONS & REPORTS
Mr. Hugg stated that the next Planning Commission regular meeting is scheduled for Tuesday,
January 16, 2018 at 7:00pm in the City Council Chambers.
Mr. Hugg provided an update on the regular City Council and various Committee meetings held
on November 27 & 28, 2017 and December 11 & 12, 2017.
Mrs. Melson-Williams stated that Mr. Dave Hugg is officially the City Planning Director. City
Council took action as a result of their meetings on December 11, 2017 to make that appointment
permanent from an “acting” status. Staff has been working on their schedule of deadlines and
meetings for 2018. The schedules pertaining to the types of applications that the Planning
Commission considers has been placed on the Commissioner’s desks. Any application that
would be appearing before the Planning Commission is subject to a process for applying for that
application which starts with a pre-application meeting with Planning Staff that can be scheduled
at any time and then they can file an application. These are the schedules related to Conditional
Uses, Site Plans, Subdivisions, Rezoning and Annexation.
1
Page 5
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
Mr. Tolbert took a moment to congratulate Mr. Hugg as being the Director of Planning. He
doesn’t think that they could have gotten a better, more experienced person and we are going to
do everything to make his appointment a pleasant one.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the
meeting.
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval: None
2) Revisions to Applications:
A. S-16-24 Advantech at 151 Garrison Oak Drive, Garrison Oak Technical Park Lot #13 –
Revised Plan & Architecture – Update on Revisions to Site Plan and Building
Architecture associated with the Site Development Plan application for Advantech
approved by the Planning Commission on November 21, 2016 with Final Plan approval
granted June 16, 2017. The size and configuration of the building has been reduced in
size to 14,700 S.F. from a 15,989 S.F. office building and light manufacturing facility.
Associated revisions are also proposed for the outdoor loading and parking areas and
other site improvements. The Performance Standards Review Application was previously
approved indicating the project as conforming to the applicable performance standards as
outlined in Zoning Ordinance, Article 5 §8 Performance Standards. The subject property
consists of 10.06 acres and is located on the east side of Garrison Oak Drive north of
White Oak Road; also known as Lot 13 of the Garrison Oak Technical Park. The property
is zoned IPM-2 (Industrial Park Manufacturing Zone - Technology Center). The owner of
record is Protective Properties, LLC. Property Address: 151 Garrison Oak Drive. Tax
Parcel: LC-05-068.00-02-13.00-000. Council District 3.
Representative: Mr. Mark Strickland, Century Engineering, Inc
Mrs. Melson-Williams stated that this is the project known as S-16-24 Advantech. It’s a proposal
for an office and light manufacturing facility to be located in the Garrison Oak Technical Park.
What is seen on the screen is the architecture of the building that was presented a little over a
year ago, specifically at the Planning Commission’s November 21, 2016 meeting. The Planning
Commission, at that point, did grant conditional approval of the architecture of the building as
well as the Site Plan for the project. Ultimately, the project moved through the process to achieve
Final Site Plan approval. Final Site Plan approval for the project was granted in June 2017. Over
time, there have been some design revisions to the building architecture and the Site Plan. What
you see on the screen now is the revised architecture for this building. Specifically, the building
footprint has been reduced in size from what was originally proposed at 15,989 SF to a building
of 14,700 SF. By doing that, they also have simplified the building architecture. The main entry
still remains on what is the southwest side of the building that faces Garrison Oak Drive but the
overall massing of the building has slightly changed in the roof configuration as well as the
exterior finish materials for the project. You see a slightly different roof form with the front part
of the building being the office area and then the rear of the building is more of the
manufacturing type facility with the larger roll up doors on the sides of the facility.
2
Page 6
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
The Site Plan did achieve Final Site Plan approval. Basically, you can see from Garrison Oak
Drive that there are two entry points into the site with circulation across the front of the building
and then parking on either side of the building including the larger area which was more of a
loading and work yard area surrounding the building. The building itself that the Planning
Commission saw and what ultimately had Final Site Plan approval was more of a “T” shaped
building. The next slide shows that while the entrances from Garrison Oak Drive and the general
location of parking remains relatively the same, the shape of the building has changed. It’s more
of a standard rectangular shape at this point. In reducing the building footprint, there has been a
reduction in the total impervious cover of the site. They have basically maintained the general
grading on the site because of the stormwater management that was already done at the facility.
There are a number of changes to some of the parking locations; some of which provide a better
accessibility and alignment to getting into those spaces and also to react to the changes in the
building itself.
This evening, they bring this Revised plan and the building architecture as an update to the
project. What the applicant will need to be doing now is updating the plans in order to once again
achieve Final Site Plan approval because of the changes to the site and the building information.
It is not subject to public hearing. The applicant submitted a detailed cover letter and then the
series of plans and elevations that they just ran through. She’s sure that they can identify any
additional things that she has missed with what has changed with the project. This is an
informational item brought to the Planning Commission to make them aware of the changes in
order to get Final Site Plan approval. For the Revised plan, Planning Staff will be confirming
compliance with the Zoning Ordinance for things like parking and any of the changes that may
have been triggered by the reduction in the building size.
Mr. Tolbert questioned if the changes that are proposed will substantially change what the
applicant originally wanted to do? Responding to Mr. Tolbert, Mr. Strickland stated no, not at
all.
Mr. Strickland stated that he thinks Mrs. Melson-Williams covered everything pretty well. If
anyone has any more questions about the specific details of it, he will be glad to go into more
detail but he doesn’t want to repeat everything that she just said. The site is going to be the exact
same purpose. The building is just a little smaller because they are trying to do cost saving and
value engineering and reduce the overall cost of the project. They brought in the parking areas
around the building to accommodate the small building so that there was not a big open space
between the parking areas and the building. They shifted a few parking spaces around to better
use the layout of the site with the smaller building. The purpose of the project is exactly the
same.
Mr. Tolbert questioned if the applicant was in agreement with Mrs. Melson-Williams’ overview
of the application? Responding to Mr. Tolbert, Mr. Strickland stated yes.
Mr. Holt questioned the reason for the change in the roofing material from asphalt to metal?
Responding to Mr. Holt, Mr. Strickland stated that he is not the architect who did that but the
3
Page 7
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
whole purpose of the architectural changes was all cost reduction. He is going to assume that it
was a cost reduction measure but he is not 100% positive.
Mr. Tolbert stated that Mr. Hugg says that there is a longer life involved with a metal roof.
Mr. Hugg stated that he is just speculating but he would assume that compared to an asphalt roof
you have at least twice as much life and much less maintenance. Wasn’t a portion of the original
building metal roofed to begin with? Responding to Mr. Hugg, Mr. Strickland stated yes; a
portion of the warehouse was going to be metal roofed to begin with.
Mr. Hugg stated that this is a change but it’s not a significant change. Responding to Mr. Hugg,
Mr. Strickland stated that the office building up front is now going to be all metal.
Mr. Holden questioned if this application needs a motion to approve or is this advisory?
Responding to Mr. Holden, Mrs. Melson-Williams stated that this is brought to the Commission
as an advisory update on the project. The Commission could certainly accept the revision and
direct the applicant to continue to work with Staff in achieving a Revised Site Plan Approval.
Mr. Holden moved to approve S-16-24 Advantech at 151 Garrison Oak Drive, Garrison Oak
Technical Park Lot #13-Revised Plan & Architecture, to grant Planning Commission approval
of this advisory plan and to require the applicant to continue to work with Planning Staff
towards Final Site Plan Approval, seconded by Mr. Holt and the motion was carried 9-0 by roll
call vote. Mr. Holden voting yes; the plan retains compliance with Code and the Performance
Standards and they are going to be a welcomed addition in the Technical Park for the City. Mr.
Roach voting yes; for all of the reasons previously stated. Ms. Edwards voting yes; based on all
of the reasons previously stated. Mr. Holt voting yes; he thinks that it’s going to be a nice
addition to the Technical Park. Mr. Baldwin voting yes; based on the reasons previously stated.
Dr. Jones voting yes; based on previous reasons stated. Mrs. Welsh voting yes; for all for the
reasons previously stated. Mrs. Maucher voting yes; for reasons previously stated. Mr. Tolbert
voting yes; for all of the reasons stated and they can appreciate the work that’s being done there.
The changes and revisions are not substantially changing the original plan.
NEW APPLICATIONS
1) US-17-02 Chesapeake Utilities Dover Campus Unified Comprehensive Sign Plan – Public
Hearing and Review of a Unified Comprehensive Sign Plan for the campus of Chesapeake
Utilities and Eastern Shore Natural Gas consisting of a series of freestanding signs, wall signs,
and canopy signs to identify the various aspects of the campus. The campus consists of an
office building, warehouse building, vehicle and material storage areas, compressed natural gas
dispensers and associated site improvements of parking and landscaping. The property consists
of 20.57 +/- acres and is located on the south side of Krisko Circle between Bay Road and
State Route 1. The property is zoned IPM (Industrial Park Manufacturing Zone) and is partially
subject to the SWPOZ (Source Water Protection Overlay Zone). The owner of record is
Eastern Shore Natural Gas. Property Addresses: 500 and 600 Krisko Circle. Tax Parcel: ED05-
077.00-03-06.00-000. Council District 2. The campus is currently under development as per
Site Plan S-16-11. Also under review is a Request for a Street Name Change (MI-17-07) which
4
Page 8
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
seeks to have the name of Krisko Circle changed to Energy Lane.
Representatives: Mr. Mark Parker, Eastern Shore Natural Gas; Mrs. Kim Diehl, Kent Sign Co.
Mr. Diaz stated that this is a Unified Comprehensive Sign Plan for Chesapeake Utilities and
Eastern Shore Natural Gas. They are building a new complex in the Stover Professional Campus
that is just off of Bay Road. That area is zoned IPM (Industrial Park Manufacturing Zone). This
property was previously addressed as 500 and 600 Krisko Circle but as of last Monday, is now
addressed as 500 and 600 Energy Lane after a successful reading at City Council.
This property qualifies for a Unified Comprehensive Sign Plan because it contains four principle
structures that are under common ownership and in this case, an office building towards the
north of the site, a warehouse building that is towards the east, a truck shelter at the south portion
of the site and then a gas station in the very southwest portion of the site. As a reminder,
Planning Commission approval of a Unified Comprehensive Sign Plan supersedes the standard
Sign Regulations of the Zoning Ordinance so that the applicant is no longer held to the typical
standards of size, number or type of signs. They are instead held to what the approved
Comprehensive Sign Plan allows.
The display slides show the specific signs that the applicant has asked for. They instead have two
monument signs labeled “A” and “B”, three wall signs labeled “C” and “D” and six gas station
canopy signs labeled “E1” and “E2”. There is a total of 297 SF and the applicant’s sign book
contains the specifics of all of the signs that they are asking for. Monument sign A is about 24 SF
of signage with the structure being a bit larger than that. Monument sign B is also on a relatively
large structure. Another rendering shows two of the wall signs; one is a “Customer Care” that is
just over their entrance and then two copies of a bird logo that would be mounted on the second
floor. Finally, they have an example of the gas canopy signage with the specific labels that they
would like to adhere to that canopy.
In the process of reviewing the application, they came across a few uncertainties. They couldn’t
get a good look at the bird logo sign that was on the east side of the building and they weren’t
sure how that would be mounted. They also weren’t sure whether the “Customer Care” letters
were a wall sign or a roof sign. But they did learn from the applicant that the bird sign on the
eastern side would be mounted at the same height and would have the same lighting scheme as
the bird sign that you see on the slide shown on the display. They learned that the “Customer
Care” letters would be a roof sign. Roof signs aren’t typically permitted but they can be allowed
through a Comprehensive Sign Plan. They also learned that the bird signs would be with a halo
affect rather than the face of it being lit up which does make them a bit dimmer than they first
thought they would be. They were a little leery at first about the amount of signage on the gas
canopy because this gas station is right next to Route 1. They typically try to limit the amount of
private signage that’s visible from Route 1 but they worked with the applicant to reduce the
signage to what they believe is an acceptable level. Staff thinks that the rest of the signage is
appropriate to the nature of the use and the size of the campus so their recommendation now is
just that the Planning Commission approve the Unified Comprehensive Sign Plan as presented.
Mr. Parker stated that there are no further comments at this time.
5
Page 9
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
Mr. Tolbert questioned if the applicant was willing to cooperate and work with the Planning
Staff regarding the signage? Responding to Mr. Tolbert, Mr. Parker stated yes.
Ms. Maucher questioned if the fueling station would be operating 24/7? Responding to Ms.
Maucher, Mr. Parker stated that it likely will be. It’s a natural gas fueling station; it’s a
destination location and he thinks that the intention is to have it available for 24/7 operation.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mrs. Welsh moved to approve US-17-02 Chesapeake Utilities Dover Campus Unified
Comprehensive Sign Plan inclusive of all of the DAC Comments, seconded by Ms. Edwards and
the motion was carried 8-0 by roll call vote with Mr. Holden recused. Mr. Roach voting yes. Ms.
Edwards voting yes; based on Staff recommendations. Mr. Holt voting yes; he will know where
to go when he goes to pay his bill. Mr. Baldwin voting yes; based on Staff recommendations. Dr.
Jones voting yes; based upon previous discussion and the applicant’s willingness to work with
the Planning Staff and consider the DAC Comments. Mrs. Welsh voting yes; the proposal is well
thought out and well done. Ms. Maucher voting yes; for the reasons previously stated. Mr.
Tolbert voting yes; the signage presents no problem and is very tastefully done.
Mrs. Melson-Williams noted for the record that Mr. Holden recused himself because he is an
employee of said applicant.
NEW BUSINESS
1) Nomination and Election of Officers (Chairman and Vice-Chairman)
Mrs. Melson-Williams stated that a copy of the By-laws of the Planning Commission was on
their desks. The officers of the Commission consist of a Chairman and a Vice-Chairman. The
Chairman shall preside at the meetings and hearings of the Planning Commission and shall have
the duties usually conferred upon a presiding officer. He/She continues to exercise the perogative
of an individual member of the Planning Commission while performing their duties of presiding
officer. Meaning that they could make motions if they so choose. The Vice-Chairman is the
presiding officer in the absence of the Chairman. The By-laws in Section 6 go on to explain how
the election of the officers is to occur. The officers are supposed to be elected by the
Commission at the annual organizational meeting which is typically scheduled in July of each
calendar year. However, because of the continued delay for fully appointing the Commission,
they pushed the annual meeting until this evening. The By-laws do note that the election of
officers shall be held by secret ballot once the nominations are put forth. A motion to suspend
rules can be made if the Commission doesn’t feel that a secret ballot is necessary. Obviously,s
the candidate receiving the majority vote of the entire membership is declared elected and serves
for a period of one year until their successor takes office. The Chairman and Vice-Chairman are
limited to three consecutive one year terms in that office. Once you have held either of those
positions for three consecutive terms, you have to vacate the position for at least one year before
you could be elected again. Mr. Tolbert was elected Chairman in July 2015 and then again in
July 2016 so as of today he would be finishing up his second term and is eligible for re-election
6
Page 10
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
to the Chairman position for one additional year.
Nominations for Chairman were opened to the floor.
Dr. Jones nominated Mr. Tolbert to serve as the Chairman.
Mr. Holt moved that the nominations for Chairman be closed on the said name, seconded by Mr.
Roach.
Mr. Holden moved to suspend the secret ballot confident that they have one very qualified
applicant nominated and nominations have been closed, seconded by Mr. Roach and the motion
was unanimously carried.
Mr. Tolbert will serve as Chairman.
Nominations for Vice-Chairman were opened to the floor.
Mr. Roach nominated Mr. Holden to serve as the Vice-Chairman, seconded by Ms. Maucher.
Mr. Roach moved that the nomination for Vice-Chairman be closed on the said name and to
suspend the secret ballot, seconded by Mrs. Welsh and the motion was unanimously carried.
Mr. Holden will serve as Vice-Chairman.
2) Appointment of the Architectural Review Oversight Subcommittee of Planning Commission
(in accordance with Zoning Ordinance, Article 10 §2.28)
Mrs. Melson-Williams stated that included in the packets is the one page summary that gives the
Code citation from the Zoning Ordinance in regards to this Subcommittee of Planning
Commission. It is very specific in its membership in that two of the members are to be Planning
Commission members, two additional people are to be design professionals and then the Mayor
has seat on that Committee or his designee. There is also the opportunity to provide for alternates
for the design professional positions. The one page sheet includes the current appointees as of the
July 18, 2016 seating of the Subcommittee. This evening, the Planning Commission needs to
address the membership of this Subcommittee. It only meets and is called upon if you so choose
to refer the architecture of a particular application to that Committee for some additional
consultation. In her experience here, they have had that happen at least once. It is something that
is allowed in the Code and as part of the Planning Commission’s annual meeting activities, the
Commission needs to set the membership of that Subcommittee.
Mr. Tolbert questioned if the people who are currently serving on the Subcommittee could no
longer serve on the Committee? Responding to Mr. Tolbert, Mrs. Melson-Williams stated that
there is no guidance given to the Planning Commission membership of this Subcommittee. They
could continue to serve if the Commission so desires.
Mr. Tolbert questioned if they should have nominations for this Subcommittee?
7
Page 11
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
Mr. Roach questioned if they should entertain the idea of asking the two Planning Commission
members if they want to continue serving in that role before we decide to re-elect them or vote
for someone else? Responding to Mr. Roach, Mr. Tolbert stated that they certainly can. The
members from the Planning Commission who are involved are Mrs. Welsh and Mr. Holden. If
we want them to continue, we can state that. If you want to nominate other members, we can do
that as well.
Mr. Tolbert asked if Mrs. Welsh and Mr. Holden would still want to continue on the
Subcommittee. Responding to Mr. Tolbert, Mr. Holden stated that he would be pleased to still
serve if desired by the Commission.
Mr. Holt questioned how many times they have been called upon to render their opinions on
architecture? Responding to Mr. Holt, Mrs. Melson-Williams stated that she can think of one
project where the Committee did meet. It’s probably been over five years now. It was the school
building project at the Seventh Day Adventist Church that is on Wyoming Avenue. That project
was referred to the Subcommittee to look at the architecture of that new building proposed on
that site. That is the only one that readily comes to mind.
Mr. Holden mentioned that the other two individuals, Mrs. Keiffer and Dr. Chandler joined the
Architectural Review Board when Mrs. Welsh and himself did and he believes that it was about
a year and a half ago. They had been willing at that time but he is not sure if they need to address
their positions as well. If they were interested before and haven’t had to serve, if we would like
to keep them we should probably check back with them just to be sure. Responding to Mr.
Holden, Mrs. Melson-Williams stated that Planning Staff has not reached out to them. She
knows that Mrs. Keiffer is still in her position as the Director with Kent County. She is not sure
if Dr. Chandler is still with Delaware Tech but he certainly has the background. If the
Commission would like those individuals to continue to serve, Planning Staff could certainly
confirm that for you. If they are unwilling, then Planning Staff could come back to the
Commission to seek other alternative appointments if necessary.
Mr. Tolbert questioned if the Commission has to vote on those positions too? Responding to Mr.
Tolbert, Mrs. Melson-Williams stated yes, the Zoning Ordinance says that the Subcommittee is
appointed by the Commission so that would include these two design professionals. You also
have the opportunity to appoint alternative design professionals as well.
Mr. Tolbert questioned if they are also supposed to vote on the Mayor’s designee? Responding to
Mr. Tolbert, Mrs. Melson-Williams stated that the Mayor serves by name or he may designate
somebody. She thinks that typically it is just listed as the Mayor. It would be in the best interest
if you did have alternative design professionals. She thinks that they are placed as alternates in
the instance where one or both of the other appointed design professional members are
unavailable for a meeting of the Subcommittee.
Mr. Holden stated that he believes that what they did last time so that after the meeting where
Mrs. Welsh and himself were put forth, they sought out and got some buy in from Mrs. Keiffer
and Dr. Chandler and then brought them back at a later time.
8
Page 12
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
Mr. Roach questioned if they could vote on the Planning Commission members and then table
Mrs. Keiffer and Dr. Chandler until we reach out to them on their willingness to continue to
serve on the Subcommittee and also have time to reach out for alternates? Responding to Mr.
Roach, Mrs. Melson-Williams stated that you could certainly do that. If there are alternates that
you have in mind, Planning Staff could certainly check as to their availability.
Mr. Holden stated that as an alternative, they could nominate Mrs. Keiffer and Dr. Chandler and
if they wanted out then they could address that later too.
Mr. Tolbert stated that he is a little confused as to what they should be doing at this point. They
are sure of Mrs. Welsh and Mr. Holden but they can’t be sure of Mrs. Keiffer and Dr. Chandler.
Dr. Jones questioned if it would be more important to reach out to those individuals and then
come back to vote or must we complete this process this evening? Responding to Dr. Jones, Mr.
Tolbert stated that he would like to see the Planning Staff reach out to the members first and then
they will know what they are doing.
Mrs. Melson-Williams stated that they could consider that proposal. It needs to be in the form of
a motion so that we can move forward with something.
Ms. Maucher questioned if we could also ask Staff to make recommendations for the alternate?
Responding to Ms. Maucher, Mrs. Melson-Williams stated that you could certainly ask Staff to
do that as well.
Dr. Jones moved to approve that the Commission withhold any action on appointing the Design
Professionals until Staff has reached out to the individuals, Ms. Keiffer and Dr. Chandler to
determine whether or not that are willing to serve again and also that Staff be in the position to
offer a name of a Design Professional as an alternate member of the Architectural Review
Subcommittee, seconded by Mr. Holt.
Mr. Tolbert questioned if that included getting the name from the Mayor? Responding to Mr.
Tolbert, Mr. Roach stated that Dr. Jones included the alternates.
Dr. Jones stated that she thinks that in her motion she did not included that based upon what Mrs.
Melson-Williams had indicated about the Mayor’s person.
Mr. Tolbert stated that he is aware of what Mrs. Melson-Williams said. They are going to reach
out to Ms. Keiffer and Dr. Chandler but while they are reaching out, they can ask the Mayor as
well. He may have an answer or he may not. But when they come back to the Commission, they
will have whatever information that they have at that time which will certainly be more than
what we have now.
Dr. Jones moved to approve that the Commission withhold any action on appointing the Design
Professionals until Staff has reached out to the individuals, Ms. Keiffer and Dr. Chandler to
determine whether or not that are willing to serve again and also that Staff be in the position to
offer a name of a Design Professional as an alternate member of the Architectural Review
9
Page 13
CITY OF DOVER PLANNING COMMISSION DECEMBER 18, 2017
Subcommittee, seconded by Mr. Holt and the motion was unanimously carried 9-0.
Mr. Roach stated that he didn’t think that the Commission had officially done a vote to nominate
Mr. Holden and Mrs. Welsh.
Mrs. Melson-Williams stated that she is not sure that Dr. Jones addressed the Planning
Commission membership so if someone would like to make a motion to nominate the two
Planning Commission members of the Subcommittee they could since you have some indication
of willingness to serve.
Mr. Holt moved to approve that the Planning Commission members, Mr. Holden and Mrs. Welsh
be appointed to the Architectural Review Subcommittee if they are willing to serve, seconded by
Dr. Jones and the motion was unanimously carried 9-0.
Meeting adjourned at 7:58 PM.
Sincerely,
Kristen Mullaney
Secretary
10
Page 16
MEMORANDUM
Department of Planning & Inspections
P.O. Box 475
Dover, DE 19903
Phone: (302) 736-7196 Fax (302) 736-4217
DATE: February 9, 2018
TO: Members of the Planning Commission
FROM: Planning Office
SUBJECT: S-17-29 Delaware State University Residence Hall at 1200 N. DuPont
Highway: Master Plan: Revised Site Plan & Building Architecture
At its November 20, 2017 meeting, the Planning Commission granted conditional approval for
Site Development Master Plan Application for the Delaware State University Residence Hall
project. The project phases consist of the following: Phase 1- Relocation of Utilities, Phase 2 -
Construction of Residence Hall and Demolition of Laws Hall, and Phase 3 - Demolition of
Tubman Hall. The subject project area is internal to the Delaware State University Campus of
287.32 +/- acres. The property is zoned IO (Institutional and Office Zone) and subject to the
SWPOZ (Source Water Protection Overlay Zone) – Tier 3: Excellent Recharge Area. The campus
is located west of North DuPont Highway and north of College Road. The owner of record is
State of Delaware c/o Delaware State University. Property Address: 1200 North DuPont
Highway. Tax Parcels: ED-05-057.00-01-19.00-000, ED-05-057.00-01-20.00-000, and ED-05-
057.00-01-21.00-000.
As the project design has progressed in the Administrative Site Plan review process for each
Phase, there have been design and programmatic changes. The Administrative Site Plan S-17-31
for Phase 1 – Relocation of Utilities achieved Final Plan approval on January 16, 2018 and this
construction activity is underway. Administrative Site Plans for S-17-33 Phase 2: Residence Hall
and Demolition of Laws Hall and S-17-34 Phase 3: Demolition of Tubman Hall are currently
under review. A recent submission for Phase 2 identified changes to the proposed Residence Hall.
The Site Development Master Plan (and associated Administrative Site Plan S-17-33) are
proposed for Revision to consist of a new 192,141 S.F. five-story Student Residence Hall of 620
Beds and with architectural changes to exterior finishes. The communication from the
Applicants highlights the following changes to the Site Plan and the Building Architecture:
1. Increase in the total square footage of the Residence Hall building from the approved
190,000 SF to 192,141 SF.
2. The total bed count of the Residence Hall building has increased from the approved 600
beds to a total of 620 beds. (Achieved through re-programming of first floor areas.)
3. Revisions in appearance of the Building Architecture include changes to exterior finish
materials in certain areas and the refinement of building footprint and wall projections.
Attached are copies of the Revised Site Plans and a series of color renderings of the Revised
Building Architecture. The information is presented to the Planning Commission as an update on
the project and as a revision to the approved Master Plan. The applicant will be working with
Planning Staff and the various other agencies to seek approval of the associated Administrative
Site Plans which will incorporate the revisions.
Page 17
City of Dover
DATA SHEET FOR CONDITIONAL USE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF February 07, 2018
PLANNING COMMISSION MEETING OF February 20, 2018
Plan Title: Governors Café Kitchen Addition at 144 Kings Highway SW,
C-18-01
Plan Type: Conditional Use Site Plan
Property Location: Southern intersection of American Avenue and Kings Highway
Property Address: 144 Kings Highway SW, Dover
Owner: Cahall Properties, LLC
Applicant (Lessee): Raymond R. Searles
Tax Parcel: ED-05-077.05-04-40.00-000
Present Zoning: RG-O (General Residence and Office Zone)
H (Historic District Zone)
Site Area: 0.7419 +/- acres
Present Use: First Floor: Restaurant (cafe)
Upper Floors: Offices
Proposed Addition Use: First floor: Restaurant (cafe) with expanded kitchen area
Addition Area: 344 S.F.
Parking: Required – None required for café; parking spaces required for
office square footage
Existing – 13 off-street spaces
18 on-street spaces adjacent to property
Sewer & Water: City of Dover
Waivers Requested: None
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 18
City of
Dover
CITY OF DOVER DEVELOPMENT ADVISORY Planning
Office
COMMITTEE APPLICATION REVIEW
COMMENTARY
D.A.C. MEETING DATE: February 7, 2018
APPLICATION: Governors Café Kitchen Addition at 144 Kings Highway SW: Conditional
Use Site Plan
FILE #: C-18-01 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Julian Swierczek, Planner I PHONE #: (302) 736-4442
I. PLAN SUMMARY:
This is a Conditional Use Site Plan Application to permit the construction of a one-story, 344 SF
addition to the kitchen for the Governors Cafe. The Governors Café is located within the existing
building at 144 Kings Highway SW. The property consists of 0.7419 +/- acres and is located at
the southernmost intersection of American Avenue and Kings Highway. The property is zoned
RG-O (General Residence and Office Zone) and is subject to the H (Historic District Zone). The
owner of record is Cahall Properties, LLC. Address: 144 Kings Highway SW. Tax Parcel: ED-
05-077.05-04-40.00-000. Council District 2.
Previous Applications
At its December 21, 2017 meeting, the Historic District Commission granted approval of the
Architectural Review Certificate for HI-17-04 Governors Café Kitchen Addition at 144 Kings
Highway. The application included the current plans for the 344 SF, one-story addition to the
kitchen at the Governors Café.
The restaurant was initially established following the Planning Commission action to approve
Conditional Use Application C-11-03 at its June 20, 2011 meeting which established the
restaurant (café) use in the building used for offices. At its meeting of August 20, 2012, the City
of Dover Planning Commission moved to approve the Revised Conditional Use application
allowing the applicant to operate as a restaurant with the capacity to serve beverages with
alcohol. The approval allows for the use as a café/sandwich shop with the sale of alcohol on the
first floor of the existing building located at 144 Kings Highway. The Planning Commission
moved to approve the continuation of the Condition Use Permit at its August 19, 2013 meeting.
II. PROJECT DESCRIPTION
The applicants are proposing a kitchen addition to the restaurant located within the existing
structure. According to the Zoning Ordinance, “restaurants” are an acceptable Conditional Use in
Page 19
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 3 of 7
a RG-O Zone when the property is in the Historic District Zone, as stipulated in Zoning
Ordinance, Article 3, Section 9.14 (b).
The plans submitted by the applicant further identify an area for a “special events tent” with
seating for 56 people, as well as a further 24 seats outside the designated tent area for special
events seating around an existing fountain. The applicant states that this event space would only
be erected on Saturdays during business hours for special events and would be dismantled at the
end of the day when no longer needed, so as to cause no inconvenience to neighbors. They also
plan to provide porta-potties for the use of guests of the special event tent.
III. ZONING REVIEW
RG-O Zoning District: The property is zoned RG-O (General Residence and Office Zone) which
includes an allowance for restaurant use, meaning the present use as a cafe is permitted under a
Conditional Use Permit (Article 3, Section 9.14 (b)). The property is also subject to the H
(Historic District Zone). This application is required as the restaurant use is expanding.
Historic District Zone
The parcel involved with this application is within the H (Historic District Zone). The Zoning
Ordinance details the requirements of the Historic District Zone in Article 3, Section 21 and its
subsections. The purpose of the Historic District Zone regulation is to preserve and enhance the
unique character and value of the old portion of Dover as an area of special charm and interest. It
is particularly intended that the regulations prevent, in the historic district, any change of
conditions that would be deemed to be a disfigurement or degradation of the present unique
visual and architectural qualities of the district. To this end, more stringent standards are applied
to development taking place in this zone.
The Zoning Ordinance notes that an Architectural Review Certificate shall be required for the
demolition, construction, reconstruction, alteration or restoration of any new or existing structure
or where general exterior repairs are made within the Historic District, as provided in Article 10,
Section 3 of this ordinance. The proposed architecture for the building addition has been
reviewed by the Historic District Commission. See the Historic District Commission Report on
Architectural Review Certification.
Conditional Use Review
With Conditional Use Applications, the Planning Commission reviews the proposed project to
determine whether or not the intended use is appropriate in type and scale for the immediate
neighborhood. The Commission must also consider whether or not the proposed use will have an
adverse impact on the future orderly development of the surrounding area. The following
sections of the Zoning Ordinance which relate to the role of the Commission in reviewing
Conditional Use applications are particularly relevant when reviewing this application:
ARTICLE 10. PLANNING COMMISSION
Section 1. - Approval of conditional uses.
Page 20
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 4 of 7
On application and after public notice and hearing, the commission may authorize
the issuance by the city planner of permits for any of the conditional uses for which this ordinance
requires, in the district in which such use is proposed to be located. In approving any such use, the
planning commission shall take into consideration the public health, safety and welfare, the comfort and
convenience of the public in general and of the residents of the immediate neighborhood in particular,
and may prescribe appropriate conditions and safeguards as may be required in order that the results of
its action may, to the maximum extent possible, further the expressed intent of this ordinance and the
accomplishment of the following objectives in particular:
1.1 Accessibility for emergency response. That all proposed structures, equipment or
material shall be readily accessible for fire, ambulance, police, and other emergency response;
1.2 Harmony of location, size and character. That the proposed use shall be of such location,
size and character that, in general, it will be in harmony with the appropriate and orderly
development of the zone in which it is proposed to be situated and will not be detrimental to the
orderly development of adjacent properties in accordance with the zoning classification of such
properties;
1.3 Residential zones. That, in addition to the above, in the case of any use located in, or
adjacent to, a residential zone:
1.31 The location and size of such use, the nature and intensity of operations involved
in or conducted in connection therewith, its site layout and its relation to access streets
shall be such that both pedestrian and vehicular traffic to and from the use and the
assembly of persons in connection therewith will not be hazardous or inconvenient to,
or incongruous with, the said residential district or conflict with the normal traffic of the
neighborhood; and
1.32 The location and height of buildings, the location, nature and height of walls and
fences, the nature and extent of landscaping, and other improvements on the site shall
be such that the use will not hinder or discourage the appropriate development and use
of adjacent land and buildings.
If the Planning Commission approves a Conditional Use, the use is granted as a Conditional
Use Permit. Such permits may be permanent, subject to limitations outlined in Zoning
Ordinance, Article 10 §1.41, or be required by the Commission to undergo periodic renewal,
using the procedure described in Article 10 §1.42. Any Conditional Use Permit, permanent or
not, may be revoked using the procedure described in Article 10 §1.43 if the conditions
prescribed by the Commission in conjunction with the issuance of the Conditional Use Permit
have not been, or are no longer being complied with.
IV. BUILDING ARCHITECTURE
The applicant has submitted color architectural elevations showing the proposed kitchen
addition at the rear of the existing building. The one-story addition to the building is covered in
a light colored horizontal siding on the northern and western facades, and the base is clad in a
red brick veneer to match the existing brick of the building. There is a flat roof with a new
parapet to match the existing architecture of the building. There is also a set of concrete steps
with black aluminum railing leading to a new 6-panel door, in the same light color of the siding.
Page 21
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 5 of 7
V. PARKING SUMMARY
Article 3 Section 9.14 (v) states that no parking shall be required for a retail user on a site that is
zoned RG-O (General Residence and Office Zone) in the H (Historic District Zone). The use of
a restaurant is here considered a “retail use,” meaning no off-street parking is required. The site
however still proposes to maintain the current thirteen (13) off-street parking spaces, including
one (1) handicapped parking space. It should also be noted that the existing structure includes a
parking garage for two (2) vehicles.
The second and third floors of the building are noted as being office space which is still
required to have one parking space per 300 square feet of floor space as noted in Article 4,
Section 4.15. With the office space noted as totaling 4,338 SF, that would put the off-street
parking requirement for the site at 15 spaces, exceeding the currently existing total of 13 off-
street parking spaces on the site. However, Article 6, Section 3.9 (a) states that site plan
proposals within the Downtown Redevelopment Target Area may be granted a 20 percent
reduction in the amount of off-street parking normally required due to the availability of mass
transit, municipal parking and existing pedestrian amenities. This parking reduction would put
the required off-street parking for the site at 12 spaces, making the proposed parking layout
complaint with code.
VI. SITE CONSIDERATIONS
Access
Vehicular Access to the site is via a drive at the front that connects to both Kings Highway SW
to the southeast and American Avenue to the west. There is also vehicle access to the site from
the rear alley. There is also pedestrian only access via a sidewalk leading to the building from
the Kings Highway frontage. This plan includes no changes to the current accessibility of the
site. An opportunity for bicycle parking is known to exist on the site.
Sidewalks
The Zoning Ordinance, Article 5, Section 18 requires sidewalks to be installed along the public
street frontages of a property. The site has an existing sidewalk approximately four (4) feet wide
along the frontage of Kings Highway SW as well as American Way. This application proposes
no changes to the sidewalks on the site.
VII. TREE PLANTING AND LANDSCAPE PLAN
The tree planting requirements are based on the project property or the project’s development
area. Article 5, Section 16.62 states that “[a] lot shall attain or exceed a tree density of one tree
per 3,000 square feet of development area or fraction thereof.” Based on this, the lot’s size of
32,315 SF would require a minimum of 11 trees. No changes are planned to the current
landscaping or tree count; therefore, the site’s current count of 20 trees will remain compliant
with code.
VIII. CITY AND STATE CODE REQUIREMENTS
The subject proposal has been reviewed for code compliance, plan conformity, and
completeness in accordance with this agency’s authority and area of expertise. The following
items have been identified as elements which need to be addressed by the applicant:
Page 22
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 6 of 7
1) The Final Plan must include considerations and specifications for Historic District Zone (H)
requirements. Also list Historic District Zone as part of the zoning of the property.
2) The Plan must include the current location and capacity for bicycle parking.
3) The Final Plan must include notes indicating the action taken by the Planning Commission
listing any conditions of approval for the Conditional Use. The plan must be revised to
reflect all changes recommended by the Planning Commission.
4) Identify the location, direction, power and time of use for any proposed outdoor lighting, as
found in Article 10, Section 2.54 (h).
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO
MEET CODE OBJECTIVES
In accordance with the Zoning Ordinance, Article 10 §1, the Planning Commission in
considering and acting upon Conditional Use Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 1.1 to 1.3.
1) The building addition is subject to the Architectural Review Certification as approved
by the Historic District Commission (HI-17-04).
X. ADVISORY COMMENTS TO THE APPLICANT:
1) Chapter 46, Article IV of the Dover Code of Ordinances states that “No person shall use or
permit to be used any public occupancy structure which does not comply with the most
currently published edition of NFPA Life Safety Code 101.” The applicant should therefore
note that before special events may be held in any temporary structure on the site, they
should first ensure that they are compliant with the NFPA Life Safety Code 101. This
review process for Special Event Activities is administered by the Office of the Fire
Marshal.
2) In the event, that major changes and revisions to the plan occur in its finalization,
contact the Planning Office. Examples include relocation of site components, and
increases in floor area. These changes may require resubmittal for review by the
Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations regarding the plan.
3) In the event, that there are changes to the architecture, building footprints, layout or
square footage of the buildings contact the Planning Office. These changes may require
review by the Planning Commission.
Page 23
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 7 of 7
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) Following Planning Commission approval of the Conditional Use Plan, the Plan must be
revised to meet all conditions of approval from the Development Advisory Committee or
as otherwise noted.
6) For new uses in an existing building, the requirements of the building code and the fire
code must be complied with. Consult with the Chief Building Inspector and City of
Dover Fire Marshal for these requirements. The resolution of these items may impact the
site design including such items as building dimensions and height, building openings,
and fire protection needs, etc.
7) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate Plan approvals, site inspections and permits are required.
8) The applicant shall be aware that Conditional Use approval does not represent a
Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 24
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 31, 2018
APPLICATION: Governor’s Café Kitchen Addition at 144 Kings
Highway SW
FILE #: C-18-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: ELECTRIC - 302-736-7072 PUBLIC WORKS – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Owner is responsible for locating all water, sewer, and storm sewer lines.
2. Owner is responsible for site and/or street lighting.
3. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
4. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
5. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
6. All Engineering and design for Dover Electric will be engineered upon receipt of final approved plans. All Engineering
work will be furnished by the City’s Electric Engineering Department.
WATER / WASTEWATER
1. Should this site be redeveloped, which includes modifications to the use, the applicant / developer will be responsible
for all costs associated with providing the appropriate meter / service / main to this site based upon the use including
any necessary system upgrades or extensions. The appropriateness and adequacy of electric, water and sewer
services and meters will be assessed at that time. (Please note that each water meter registered with the City of
Dover must have a separate service line.) Should the existing water and sanitary sewer services no longer be
required based upon the proposed use, they must be properly abandoned at the mains in accordance with all City of
Dover Department of Public Works standards and specifications.
2. Any redevelopment shall adhere to the City of Dover Water/Wastewater Handbook, the Specifications, Standards &
Procedures for City of Dover Public Works requirements, and the City of Dover’s Electric Service Handbook.
3. Please note that renovations and or change of use projects must ensure that the water and wastewater service is
brought up to current requirements. This may include relocating the water meter outside or changing service line
sizes. Please ensure you schedule a meeting with the Department of Public Works during the planning phase for this
site. Additional impact fees may apply for future development.
Page 25
Governors Café Kitchen Addition at 144 Kings Highway SW
File #: C-18-01
January 31, 2018
Page 2 of 2
STORMWATER
1. If there is any excavation or earth disturbance during construction activity for this project a Stormwater/Erosion and
Sediment Control Plan shall be submitted to the City of Dover for review and approval.
SANITATION/GROUNDS/STREETS
1. None
GENERAL
1. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format) and Adobe
Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
STREETS / WATER / WASTEWATER / STORMWATER / GROUNDS / GENERAL
1. None
SANITATION
1. This site is currently being serviced by the City of Dover. If a change to the service is required, please contact our
office to discuss options.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. Water impact fees may be associated with this project.
2. This lot shall be served by a single water service line, which shall be furnished and installed by the property owner. In
the event a property contains multiple principal structures, the property shall be served by a single water main where
a water service line may be provided to each principle structure. Each structure, which is capable of being offered for
sale, shall have its own separate water facilities.
WASTEWATER
1. Wastewater impact fees may be associated with this project.
2. This lot shall be served by a single sanitary sewer lateral, which shall be furnished and installed by the property
owner. In the event a property contains multiple principal structures, the property shall be served by a single sanitary
sewer main where a sanitary sewer lateral may be provided to each principle structure. Each structure, which is
capable of being offered for sale, shall have its own separate wastewater facilities.
STORMWATER/SANITATION/STREETS/GROUNDS/GENERAL
1. None
GENERAL
1. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 26
C F
C-18-01 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 02/07/18 D S
O H
V A
E L
APPLICATION: Governors Café Kitchen Addition 144 SW Kings Hwy
R
FILE #: C-18-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is mixed use/assembly.
2. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
3. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate.
The owner or their representative shall meet with the Fire Marshal prior to submission to agree
on the system. A letter of agreement shall be created, and signed by both parties. The letter shall
include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to
open. A letter of agreement shall be created, and signed by both parties. The letter shall include a
detailed description of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not
less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate
shall be setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
4. Fire Alarm System required per occupancy code requirements.
Page 27
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal, and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined
to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50
percent of the assessed value of the building and is capable of receiving an occupant load 75
persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall
be required to install a complete fire alarm system in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area
required to be served by the system using the A-weighted scale dBA. In the event the stated
requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting
the intent of this section of the Code.
(City Code of Ordinances 46-171)
5. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in
concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
inches (four ft.) in height above the finish grade elevation. Any deviation of the stated
requirements must be approved by the fire marshal and/or chief building inspector. The above
dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief
building inspector shall have the authority to require more stringent dimensions to fit the needs
of devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors
shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must
be approved by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
6. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four
inches in height, location, the number shall be placed on the house above or to the left or right of
Page 28
the front entrance, color, the number shall be contrasting to the background color, Arabic numerals,
all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings
with apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, color, numbers shall
be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic
numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the
street end of the building so as to be visible from either the public or private street or from the
parking lot,
property line or driveway, should the building be located far enough from a public or private road so
that the numbers are not clearly visible from the street, then the street address shall also be
posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on
each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
7. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system
that is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for
any new or existing building where a fire alarm or sprinkler system is being
installed. It shall be the responsibility of the owner or occupant to keep a set of keys
in the secured key box that are current to the locks of the protected occupancy.
Buildings with 24-hour staffing or guard service shall be exempt from this
subsection.
Location. The secured key system shall be located as close to the main entrance as
possible. Should the building design not allow the secured key system to be located
by the main entrance, the fire marshal and fire chief shall come to an agreement as to
an alternate location for the key box. A secured key system, once installed, shall not
Page 29
be obstructed from view or obstructed by any means that would delay the fire
department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of
ingress or egress, whether on the interior or exterior of the building, and keys to
locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler
controls and any area protected by automatic fire detection. Keys to individual
residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order
the key box for new buildings. It shall be the responsibility of the owner or tenant to
order the key box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be
conducted before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
8. All required means of egress shall have an exit discharge consisting of a non-slip surface, and
leading to and terminating at a public way.
9. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO. This must be scheduled in advance with Delaware State
Communications.
10. Project to be completed per approved Site Plan.
11. Full building and fire plan review is required.
12. Construction or renovations cannot be started until building plans are approved.
13. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire marshal’s Office. This work cannot be started until the permit is approved.
14. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Need to know if this will be an occupied renovation.
2. Need to know if the existing kitchen stays as is.
3. When building plans are submitted to the Chief Building Inspector, ensure that the occupant
load is calculated properly. This may result in additional comments especially if the occupant
load is over 100.
4. A shunt trip switch may be required as outlined in item #4 above.
5. Hood exhaust location must be code compliant.
6. Public Health approval will be needed.
Page 30
7. A hood may be needed for the smoker.
8. The hood will require a hood suppression system which will need to be tied to the fire alarm
panel.
9. Impact protection may be required as outlined in item #5 above.
10. Tent portion
a. This would require a City of Dover special event permit for each function.
b. Public Health approval will be needed.
c. ABC approval will be needed.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 31
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: January 31, 2018 T
===============================================================
APPLICATION: Governor’s Café Kitchen Addition
FILE#: C-18-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Joshua J. Schwartz PHONE#: 760-2768
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
The site does not have access from a state maintained roadway.
Page 32
KENT CONSERVATION DISTRICT
800 BAY ROAD SUITE 2 • DOVER, DELAWARE • 19901 •(302) 741-260
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
January 2018
APPLICATION: Governors Café Kitchen Addition at 144 Kings Highway SW FILE #: C-18-01
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Jessica L. Verchick, EIT PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO
BE ADDRESSED BY THE APPLICANT:
Source: Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. The proposed site improvements are less than 5000 square feet, the site is therefore exempt from
stormwater management requirements.
ADVISORY COMMENTS TO THE APPLICANT:
1. If at any time expansion or earth disturbing activity (clearing, grubbing tree clearing etc.) takes place and
exceeds 5000 square feet; a detailed Sediment and Stormwater Management Plan must be submitted and
approved to the Kent Conversation District.
Page 38
City of
Dover
CITY OF DOVER DEVELOPMENT ADVISORY Planning
Office
COMMITTEE APPLICATION REVIEW
COMMENTARY
D.A.C. MEETING DATE: February 7, 2018
APPLICATION: Governors Café Kitchen Addition at 144 Kings Highway SW: Conditional
Use Site Plan
FILE #: C-18-01 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Julian Swierczek, Planner I PHONE #: (302) 736-4442
I. PLAN SUMMARY:
This is a Conditional Use Site Plan Application to permit the construction of a one-story, 344 SF
addition to the kitchen for the Governors Cafe. The Governors Café is located within the existing
building at 144 Kings Highway SW. The property consists of 0.7419 +/- acres and is located at
the southernmost intersection of American Avenue and Kings Highway. The property is zoned
RG-O (General Residence and Office Zone) and is subject to the H (Historic District Zone). The
owner of record is Cahall Properties, LLC. Address: 144 Kings Highway SW. Tax Parcel: ED-
05-077.05-04-40.00-000. Council District 2.
Previous Applications
At its December 21, 2017 meeting, the Historic District Commission granted approval of the
Architectural Review Certificate for HI-17-04 Governors Café Kitchen Addition at 144 Kings
Highway. The application included the current plans for the 344 SF, one-story addition to the
kitchen at the Governors Café.
The restaurant was initially established following the Planning Commission action to approve
Conditional Use Application C-11-03 at its June 20, 2011 meeting which established the
restaurant (café) use in the building used for offices. At its meeting of August 20, 2012, the City
of Dover Planning Commission moved to approve the Revised Conditional Use application
allowing the applicant to operate as a restaurant with the capacity to serve beverages with
alcohol. The approval allows for the use as a café/sandwich shop with the sale of alcohol on the
first floor of the existing building located at 144 Kings Highway. The Planning Commission
moved to approve the continuation of the Condition Use Permit at its August 19, 2013 meeting.
II. PROJECT DESCRIPTION
The applicants are proposing a kitchen addition to the restaurant located within the existing
structure. According to the Zoning Ordinance, “restaurants” are an acceptable Conditional Use in
Page 39
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 3 of 7
a RG-O Zone when the property is in the Historic District Zone, as stipulated in Zoning
Ordinance, Article 3, Section 9.14 (b).
The plans submitted by the applicant further identify an area for a “special events tent” with
seating for 56 people, as well as a further 24 seats outside the designated tent area for special
events seating around an existing fountain. The applicant states that this event space would only
be erected on Saturdays during business hours for special events and would be dismantled at the
end of the day when no longer needed, so as to cause no inconvenience to neighbors. They also
plan to provide porta-potties for the use of guests of the special event tent.
III. ZONING REVIEW
RG-O Zoning District: The property is zoned RG-O (General Residence and Office Zone) which
includes an allowance for restaurant use, meaning the present use as a cafe is permitted under a
Conditional Use Permit (Article 3, Section 9.14 (b)). The property is also subject to the H
(Historic District Zone). This application is required as the restaurant use is expanding.
Historic District Zone
The parcel involved with this application is within the H (Historic District Zone). The Zoning
Ordinance details the requirements of the Historic District Zone in Article 3, Section 21 and its
subsections. The purpose of the Historic District Zone regulation is to preserve and enhance the
unique character and value of the old portion of Dover as an area of special charm and interest. It
is particularly intended that the regulations prevent, in the historic district, any change of
conditions that would be deemed to be a disfigurement or degradation of the present unique
visual and architectural qualities of the district. To this end, more stringent standards are applied
to development taking place in this zone.
The Zoning Ordinance notes that an Architectural Review Certificate shall be required for the
demolition, construction, reconstruction, alteration or restoration of any new or existing structure
or where general exterior repairs are made within the Historic District, as provided in Article 10,
Section 3 of this ordinance. The proposed architecture for the building addition has been
reviewed by the Historic District Commission. See the Historic District Commission Report on
Architectural Review Certification.
Conditional Use Review
With Conditional Use Applications, the Planning Commission reviews the proposed project to
determine whether or not the intended use is appropriate in type and scale for the immediate
neighborhood. The Commission must also consider whether or not the proposed use will have an
adverse impact on the future orderly development of the surrounding area. The following
sections of the Zoning Ordinance which relate to the role of the Commission in reviewing
Conditional Use applications are particularly relevant when reviewing this application:
ARTICLE 10. PLANNING COMMISSION
Section 1. - Approval of conditional uses.
Page 40
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 4 of 7
On application and after public notice and hearing, the commission may authorize
the issuance by the city planner of permits for any of the conditional uses for which this ordinance
requires, in the district in which such use is proposed to be located. In approving any such use, the
planning commission shall take into consideration the public health, safety and welfare, the comfort and
convenience of the public in general and of the residents of the immediate neighborhood in particular,
and may prescribe appropriate conditions and safeguards as may be required in order that the results of
its action may, to the maximum extent possible, further the expressed intent of this ordinance and the
accomplishment of the following objectives in particular:
1.1 Accessibility for emergency response. That all proposed structures, equipment or
material shall be readily accessible for fire, ambulance, police, and other emergency response;
1.2 Harmony of location, size and character. That the proposed use shall be of such location,
size and character that, in general, it will be in harmony with the appropriate and orderly
development of the zone in which it is proposed to be situated and will not be detrimental to the
orderly development of adjacent properties in accordance with the zoning classification of such
properties;
1.3 Residential zones. That, in addition to the above, in the case of any use located in, or
adjacent to, a residential zone:
1.31 The location and size of such use, the nature and intensity of operations involved
in or conducted in connection therewith, its site layout and its relation to access streets
shall be such that both pedestrian and vehicular traffic to and from the use and the
assembly of persons in connection therewith will not be hazardous or inconvenient to,
or incongruous with, the said residential district or conflict with the normal traffic of the
neighborhood; and
1.32 The location and height of buildings, the location, nature and height of walls and
fences, the nature and extent of landscaping, and other improvements on the site shall
be such that the use will not hinder or discourage the appropriate development and use
of adjacent land and buildings.
If the Planning Commission approves a Conditional Use, the use is granted as a Conditional
Use Permit. Such permits may be permanent, subject to limitations outlined in Zoning
Ordinance, Article 10 §1.41, or be required by the Commission to undergo periodic renewal,
using the procedure described in Article 10 §1.42. Any Conditional Use Permit, permanent or
not, may be revoked using the procedure described in Article 10 §1.43 if the conditions
prescribed by the Commission in conjunction with the issuance of the Conditional Use Permit
have not been, or are no longer being complied with.
IV. BUILDING ARCHITECTURE
The applicant has submitted color architectural elevations showing the proposed kitchen
addition at the rear of the existing building. The one-story addition to the building is covered in
a light colored horizontal siding on the northern and western facades, and the base is clad in a
red brick veneer to match the existing brick of the building. There is a flat roof with a new
parapet to match the existing architecture of the building. There is also a set of concrete steps
with black aluminum railing leading to a new 6-panel door, in the same light color of the siding.
Page 41
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 5 of 7
V. PARKING SUMMARY
Article 3 Section 9.14 (v) states that no parking shall be required for a retail user on a site that is
zoned RG-O (General Residence and Office Zone) in the H (Historic District Zone). The use of
a restaurant is here considered a “retail use,” meaning no off-street parking is required. The site
however still proposes to maintain the current thirteen (13) off-street parking spaces, including
one (1) handicapped parking space. It should also be noted that the existing structure includes a
parking garage for two (2) vehicles.
The second and third floors of the building are noted as being office space which is still
required to have one parking space per 300 square feet of floor space as noted in Article 4,
Section 4.15. With the office space noted as totaling 4,338 SF, that would put the off-street
parking requirement for the site at 15 spaces, exceeding the currently existing total of 13 off-
street parking spaces on the site. However, Article 6, Section 3.9 (a) states that site plan
proposals within the Downtown Redevelopment Target Area may be granted a 20 percent
reduction in the amount of off-street parking normally required due to the availability of mass
transit, municipal parking and existing pedestrian amenities. This parking reduction would put
the required off-street parking for the site at 12 spaces, making the proposed parking layout
complaint with code.
VI. SITE CONSIDERATIONS
Access
Vehicular Access to the site is via a drive at the front that connects to both Kings Highway SW
to the southeast and American Avenue to the west. There is also vehicle access to the site from
the rear alley. There is also pedestrian only access via a sidewalk leading to the building from
the Kings Highway frontage. This plan includes no changes to the current accessibility of the
site. An opportunity for bicycle parking is known to exist on the site.
Sidewalks
The Zoning Ordinance, Article 5, Section 18 requires sidewalks to be installed along the public
street frontages of a property. The site has an existing sidewalk approximately four (4) feet wide
along the frontage of Kings Highway SW as well as American Way. This application proposes
no changes to the sidewalks on the site.
VII. TREE PLANTING AND LANDSCAPE PLAN
The tree planting requirements are based on the project property or the project’s development
area. Article 5, Section 16.62 states that “[a] lot shall attain or exceed a tree density of one tree
per 3,000 square feet of development area or fraction thereof.” Based on this, the lot’s size of
32,315 SF would require a minimum of 11 trees. No changes are planned to the current
landscaping or tree count; therefore, the site’s current count of 20 trees will remain compliant
with code.
VIII. CITY AND STATE CODE REQUIREMENTS
The subject proposal has been reviewed for code compliance, plan conformity, and
completeness in accordance with this agency’s authority and area of expertise. The following
items have been identified as elements which need to be addressed by the applicant:
Page 42
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 6 of 7
1) The Final Plan must include considerations and specifications for Historic District Zone (H)
requirements. Also list Historic District Zone as part of the zoning of the property.
2) The Plan must include the current location and capacity for bicycle parking.
3) The Final Plan must include notes indicating the action taken by the Planning Commission
listing any conditions of approval for the Conditional Use. The plan must be revised to
reflect all changes recommended by the Planning Commission.
4) Identify the location, direction, power and time of use for any proposed outdoor lighting, as
found in Article 10, Section 2.54 (h).
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO
MEET CODE OBJECTIVES
In accordance with the Zoning Ordinance, Article 10 §1, the Planning Commission in
considering and acting upon Conditional Use Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 1.1 to 1.3.
1) The building addition is subject to the Architectural Review Certification as approved
by the Historic District Commission (HI-17-04).
X. ADVISORY COMMENTS TO THE APPLICANT:
1) Chapter 46, Article IV of the Dover Code of Ordinances states that “No person shall use or
permit to be used any public occupancy structure which does not comply with the most
currently published edition of NFPA Life Safety Code 101.” The applicant should therefore
note that before special events may be held in any temporary structure on the site, they
should first ensure that they are compliant with the NFPA Life Safety Code 101. This
review process for Special Event Activities is administered by the Office of the Fire
Marshal.
2) In the event, that major changes and revisions to the plan occur in its finalization,
contact the Planning Office. Examples include relocation of site components, and
increases in floor area. These changes may require resubmittal for review by the
Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations regarding the plan.
3) In the event, that there are changes to the architecture, building footprints, layout or
square footage of the buildings contact the Planning Office. These changes may require
review by the Planning Commission.
Page 43
C-18-01 Governor Café Kitchen Addition at 144 Kings Highway SW
DAC Report for February 07, 2018
Page 7 of 7
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) Following Planning Commission approval of the Conditional Use Plan, the Plan must be
revised to meet all conditions of approval from the Development Advisory Committee or
as otherwise noted.
6) For new uses in an existing building, the requirements of the building code and the fire
code must be complied with. Consult with the Chief Building Inspector and City of
Dover Fire Marshal for these requirements. The resolution of these items may impact the
site design including such items as building dimensions and height, building openings,
and fire protection needs, etc.
7) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate Plan approvals, site inspections and permits are required.
8) The applicant shall be aware that Conditional Use approval does not represent a
Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 44
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 31, 2018
APPLICATION: Governor’s Café Kitchen Addition at 144 Kings
Highway SW
FILE #: C-18-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: ELECTRIC - 302-736-7072 PUBLIC WORKS – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Owner is responsible for locating all water, sewer, and storm sewer lines.
2. Owner is responsible for site and/or street lighting.
3. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
4. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
5. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
6. All Engineering and design for Dover Electric will be engineered upon receipt of final approved plans. All Engineering
work will be furnished by the City’s Electric Engineering Department.
WATER / WASTEWATER
1. Should this site be redeveloped, which includes modifications to the use, the applicant / developer will be responsible
for all costs associated with providing the appropriate meter / service / main to this site based upon the use including
any necessary system upgrades or extensions. The appropriateness and adequacy of electric, water and sewer
services and meters will be assessed at that time. (Please note that each water meter registered with the City of
Dover must have a separate service line.) Should the existing water and sanitary sewer services no longer be
required based upon the proposed use, they must be properly abandoned at the mains in accordance with all City of
Dover Department of Public Works standards and specifications.
2. Any redevelopment shall adhere to the City of Dover Water/Wastewater Handbook, the Specifications, Standards &
Procedures for City of Dover Public Works requirements, and the City of Dover’s Electric Service Handbook.
3. Please note that renovations and or change of use projects must ensure that the water and wastewater service is
brought up to current requirements. This may include relocating the water meter outside or changing service line
sizes. Please ensure you schedule a meeting with the Department of Public Works during the planning phase for this
site. Additional impact fees may apply for future development.
Page 45
Governors Café Kitchen Addition at 144 Kings Highway SW
File #: C-18-01
January 31, 2018
Page 2 of 2
STORMWATER
1. If there is any excavation or earth disturbance during construction activity for this project a Stormwater/Erosion and
Sediment Control Plan shall be submitted to the City of Dover for review and approval.
SANITATION/GROUNDS/STREETS
1. None
GENERAL
1. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format) and Adobe
Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
STREETS / WATER / WASTEWATER / STORMWATER / GROUNDS / GENERAL
1. None
SANITATION
1. This site is currently being serviced by the City of Dover. If a change to the service is required, please contact our
office to discuss options.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. Water impact fees may be associated with this project.
2. This lot shall be served by a single water service line, which shall be furnished and installed by the property owner. In
the event a property contains multiple principal structures, the property shall be served by a single water main where
a water service line may be provided to each principle structure. Each structure, which is capable of being offered for
sale, shall have its own separate water facilities.
WASTEWATER
1. Wastewater impact fees may be associated with this project.
2. This lot shall be served by a single sanitary sewer lateral, which shall be furnished and installed by the property
owner. In the event a property contains multiple principal structures, the property shall be served by a single sanitary
sewer main where a sanitary sewer lateral may be provided to each principle structure. Each structure, which is
capable of being offered for sale, shall have its own separate wastewater facilities.
STORMWATER/SANITATION/STREETS/GROUNDS/GENERAL
1. None
GENERAL
1. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 46
C F
C-18-01 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 02/07/18 D S
O H
V A
E L
APPLICATION: Governors Café Kitchen Addition 144 SW Kings Hwy
R
FILE #: C-18-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is mixed use/assembly.
2. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
3. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate.
The owner or their representative shall meet with the Fire Marshal prior to submission to agree
on the system. A letter of agreement shall be created, and signed by both parties. The letter shall
include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to
open. A letter of agreement shall be created, and signed by both parties. The letter shall include a
detailed description of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not
less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate
shall be setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
4. Fire Alarm System required per occupancy code requirements.
Page 47
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal, and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined
to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50
percent of the assessed value of the building and is capable of receiving an occupant load 75
persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall
be required to install a complete fire alarm system in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area
required to be served by the system using the A-weighted scale dBA. In the event the stated
requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting
the intent of this section of the Code.
(City Code of Ordinances 46-171)
5. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in
concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
inches (four ft.) in height above the finish grade elevation. Any deviation of the stated
requirements must be approved by the fire marshal and/or chief building inspector. The above
dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief
building inspector shall have the authority to require more stringent dimensions to fit the needs
of devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors
shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must
be approved by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
6. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four
inches in height, location, the number shall be placed on the house above or to the left or right of
Page 48
the front entrance, color, the number shall be contrasting to the background color, Arabic numerals,
all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings
with apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, color, numbers shall
be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic
numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the
street end of the building so as to be visible from either the public or private street or from the
parking lot,
property line or driveway, should the building be located far enough from a public or private road so
that the numbers are not clearly visible from the street, then the street address shall also be
posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on
each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
7. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system
that is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for
any new or existing building where a fire alarm or sprinkler system is being
installed. It shall be the responsibility of the owner or occupant to keep a set of keys
in the secured key box that are current to the locks of the protected occupancy.
Buildings with 24-hour staffing or guard service shall be exempt from this
subsection.
Location. The secured key system shall be located as close to the main entrance as
possible. Should the building design not allow the secured key system to be located
by the main entrance, the fire marshal and fire chief shall come to an agreement as to
an alternate location for the key box. A secured key system, once installed, shall not
Page 49
be obstructed from view or obstructed by any means that would delay the fire
department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of
ingress or egress, whether on the interior or exterior of the building, and keys to
locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler
controls and any area protected by automatic fire detection. Keys to individual
residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order
the key box for new buildings. It shall be the responsibility of the owner or tenant to
order the key box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be
conducted before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
8. All required means of egress shall have an exit discharge consisting of a non-slip surface, and
leading to and terminating at a public way.
9. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO. This must be scheduled in advance with Delaware State
Communications.
10. Project to be completed per approved Site Plan.
11. Full building and fire plan review is required.
12. Construction or renovations cannot be started until building plans are approved.
13. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire marshal’s Office. This work cannot be started until the permit is approved.
14. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Need to know if this will be an occupied renovation.
2. Need to know if the existing kitchen stays as is.
3. When building plans are submitted to the Chief Building Inspector, ensure that the occupant
load is calculated properly. This may result in additional comments especially if the occupant
load is over 100.
4. A shunt trip switch may be required as outlined in item #4 above.
5. Hood exhaust location must be code compliant.
6. Public Health approval will be needed.
Page 50
7. A hood may be needed for the smoker.
8. The hood will require a hood suppression system which will need to be tied to the fire alarm
panel.
9. Impact protection may be required as outlined in item #5 above.
10. Tent portion
a. This would require a City of Dover special event permit for each function.
b. Public Health approval will be needed.
c. ABC approval will be needed.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 51
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: January 31, 2018 T
===============================================================
APPLICATION: Governor’s Café Kitchen Addition
FILE#: C-18-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Joshua J. Schwartz PHONE#: 760-2768
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
The site does not have access from a state maintained roadway.
Page 52
KENT CONSERVATION DISTRICT
800 BAY ROAD SUITE 2 • DOVER, DELAWARE • 19901 •(302) 741-260
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
January 2018
APPLICATION: Governors Café Kitchen Addition at 144 Kings Highway SW FILE #: C-18-01
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Jessica L. Verchick, EIT PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO
BE ADDRESSED BY THE APPLICANT:
Source: Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. The proposed site improvements are less than 5000 square feet, the site is therefore exempt from
stormwater management requirements.
ADVISORY COMMENTS TO THE APPLICANT:
1. If at any time expansion or earth disturbing activity (clearing, grubbing tree clearing etc.) takes place and
exceeds 5000 square feet; a detailed Sediment and Stormwater Management Plan must be submitted and
approved to the Kent Conversation District.
Page 53
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF February 07, 2018
PLANNING COMMISSION MEETING OF February 20, 2018
Plan Title: DGKP Property: Office/Warehouse at 1351 West North Street
Plan Type: Site Development Plan
Location: On the north side of North Street, east of Mifflin Road and west of
Commerce Way
Tax Map #: ED-05-076.14-01-07.00-000
Applicant/Owner: DGKP North Street LLC
Site Area: 5.01 +/- acres
Zoning: IPM (Industrial Park and Manufacturing Zone)
Current Use: Vacant
Proposed Use: Office/ Warehouse
Building Area: 71,775 SF
Off Street Parking: Required – Building 1: 47 (maximum 59)
Building 2: 120 (maximum: 150)
Total: 167 (maximum: 209)
Proposed – Building 1: 58
Building 2: 150
Total: 208
Sewer & Water: City of Dover
Waivers Requested: Elimination of Opaque Barrier (Fence Component)
Partial Elimination of Upright Curbing Requirement
For Consideration: Performance Standards Review Application
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 54
City of
Dover
CITY OF DOVER
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: February 7, 2018
APPLICATION: DGKP Property: Office/Warehouse at 1351 West North Street
FILE #: S-18-01 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Julian Swierczek, Planner I PHONE #: (302) 736-7196
I. PLAN SUMMARY
Review of a Site Development Plan application to permit construction of a two-story, 71,775 SF
office and warehouse complex and adjoining parking spaces. The property consists of a 5.01 +/-
acre parcel and is zoned IPM (Industrial Park Manufacturing Zone). The property is located on
the north side of North Street, east of Mifflin Road and west of Commerce Way. The owner of
record is DGKP North Street LLC. Property Address: 1351 West North Street. Tax Parcel: ED-
05-076.14-01-07.00-000. Council District 1.
Previous Applications
In January 2006, the Planning Commission granted conditional approval to project S-06-03 West
North Street Mini-Storage at this property and then a one-year extension in January 2007.
However, when the plan was not finalized and no development activity occurred the plan expired
in January 2008.
Then Site Plan Application S-08-02 was filed proposing the construction of an administrative
office building with a total of 41,372 S.F. of space, a 16,280 S.F. utility yard, and associated site
improvements. Consideration of Application S-08-02 was deferred on 1/22/2008 by the Planning
Commission at the request of the applicant; following no further action to proceed, the project file
was closed for lack of activity.
In January of 2011, Application S-11-01 for development of the site as a mini-storage facility by
owner Data Center, LLC did not proceed to Planning Commission review because project was
required to complete PLUS Review prior to the application proceeding with the local review
process. Following PLUS Review in 2012, a new application was filed.
The Planning Commission granted conditional approval to Site Plan S-12-06 West North Street
Mini-Storage on April 26, 2012. The Final Site Plan approval of S-12-06 was granted on January
16, 2014. A one-year extension was granted setting the plan expiration date for April 2015.
In May of 2015 the Planning Commission moved to grant conditional approval to the most recent
application for the site, file S-15-05 West North Street Mini-Storage. This was a Site Plan to
Page 55
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 2
permit the construction of a self-storage facility consisting of three (3) buildings totaling 108,940
SF. These were to include an office building and two (2) storage buildings with 519 units with boat
and RV storage parking and associated site improvements. The applicant had also requested a
waiver for the partial elimination of the curbing requirements. An Extension of Approval was
applied for and granted by the Planning Commission in their May 2017 meeting and will expire in
May 2018.
II. PROJECT DESCRIPTION
The property has street frontage on the north side of West North Street and lies between Mifflin
Road to the west and Commerce Way to the east. The large parcel of land immediately south of
this site is zoned IPM (Industrial Park and Manufacturing Zone) and contains a factory owned by
Proctor & Gamble. The site to the immediate east is also zoned IPM and contains offices owned
by the Capital School District. The land immediately to the west is zoned R-8 (One-Family
Residence Zone) and the site to the north is zone RG-2 (General Residence Zone).
The Site Development Plan proposes two (2) new buildings with accompanying site
improvements. Building 1 is one story and 37,125 SF, while Building 2 is two-stories and is
34,650 SF and intended to be the main Dover office space for the Delaware Department of
Insurance. The two (2) new buildings proposed to adjoin one another with Building 1 located to
the north and Building 2 located to the south. The plan proposes a total of 208 off-street parking
spaces and 4 loading spaces. The trash enclosure would be located at the rear of the buildings,
towards the north end of the parking lot. Drive access to the site would be via a full access
entrance on the south side of the site from West North Street.
III. ZONING REVIEW
IPM (Industrial Park Manufacturing Zone)
The property is zoned IPM (Industrial Park Manufacturing Zone) and subject to the regulations
of Zoning Ordinance, Article 3 Section 20 and Article 4 Section 4.16. The proposed uses of
professional offices and warehouse are permitted uses in the IPM Zone under Article 3, Section
20.
PERFORMANCE STANDARDS REVIEW
Uses in the IPM zone are subject to the Performance Standards Procedure set forth in the Zoning
Ordinance, Article 5, Section 8.1 and 8.2 and referenced sections.
Article 5 §8.1 Dangerous and objectionable elements. No land or building in any zone shall
be used or occupied in any manner so as to cause any one or more of the following
conditions to exist and to be dangerous, injurious, noxious or offensive beyond the
boundaries of such premises in such a manner or in such amount as to adversely affect the
reasonable use of the surrounding area or adjoining premises: Fire, explosive or other
hazard; noise, or vibration; smoke, dust, odor or other form of air pollution; heat, cold,
dampness or electromagnetic disturbance; glare, liquid or solid refuse or waste; traffic
congestion causing roadways or intersections in the surrounding highway network to fall
below acceptable levels of comfort and convenience; or other substance, condition or
element (referred to hereinafter as "dangerous or objectionable elements"), provided that any
use permitted or not expressly prohibited by this ordinance may be undertaken and
maintained if it conforms to the regulations of this section limiting dangerous and
objectionable elements at the point of the determination of their existence.
Page 56
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 3
The project’s compliance with a series of performance standards for the “dangerous and
objectionable elements” is to be considered by the Planning Commission. The “dangerous and
objectionable elements” are as follows:
Fire and explosion hazards (activities with and storage of)
Radioactivity or electromagnetic disturbance
Noise (sound pressure level)
Vibration
Smoke
Odors (Odorous gases or odorous matter)
Fly ash, dust, fumes, vapors, gases and other forms of air pollution
Glare (from lighting or high temperature processes)
Liquid or solid wastes
Traffic congestion (Level of Service E)
The project cannot cause the above conditions to exist so that they adversely affect the
surrounding areas or adjoining properties. The specific limits of each performance standard are
described in the Zoning Ordinance. Where the performance standards conflict with regulations
established by other state or local agencies such as the Delaware Department of Natural
Resources and Environmental Control (DNREC), the more restrictive regulations apply.
As part of this procedure, a separate Performance Standard Review Application is required to
accompany the application for Site Plan approval. The applicant has submitted a Performance
Standard Review Application letter (dated February 9, 2018) indicating the intended uses and
how the proposed development is not likely to involve the emission of dangerous and
objectionable elements detailed in Zoning Ordinance, Article 5, Section 8.5. The letter provides
details on the intended tenants of the office and office/warehouse buildings. The Planning
Commission may refer the Application to expert consultants for review if deemed necessary. The
Planning Commission is charged with determining if the proposed use conforms to the
applicable performance standards.
IV. PARKING SUMMARY
According to Zoning Ordinance Article 4 §4.16, off-street parking in the IPM zone must be
provided at a rate of one (1) space per 800 square feet of floor area or one (1) space per
employee, whichever is greater. A letter has been provided by the applicant attesting that they
will intend to employ approximately 120 employees in Building 2. The number of employees in
Building 1 is approximately 8-10 persons. Article 4 §4.16 of the Zoning Ordinance specifies a
parking requirement for offices in the IPM Zone as being one (1) space per 800 square feet of
floor area. The parking requirement based on the building square footage for Building 1 would
therefore be 47 spaces. The following chart shows the parking requirements as stated in the
Zoning Ordinance for both sets of guidelines.
Page 57
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 4
PARKING (IN IPM ZONE) MINIMUM MAXIMUM PROPOSED
Building 1 (based on square 47 59 58
footage)
Building 2 (based on employee 120 150 150
count)
Total Combined 167 209 208
According to Zoning Ordinance Article 6 §3.11, all uses have a maximum parking allowance
25% over the minimum requirement. With this maximum allotment of parking spaces and the
provided letter stipulating the number for employees expected in Building 2, the proposed
number of parking spaces of 208 is permitted by code.
Loading Space Requirement
According to Article 6, Section 4.16, for buildings up to 150,000 SF a maximum of three (2)
loading berths will be required. Additional loading berths are permitted if need by the property
owner or tenant. The applicant has indicated four (4) off-street loading berths. Article 6, Section
4.11 further indicated that one required off-street loading berth shall have minimum dimensions
of 12 feet wide and 60 feet long. Any further loading berths may have minimum dimensions of
12 feet wide and 40 feet long. Of the 4 loading berths proposed by the applicant, 3 will be 12 feet
wide and 60 feet long, and the fourth loading berth will be 12 feet wide and 40 feet long. The
proposed loading berths are therefore permitted by code.
Bicycle Parking
Bicycle parking is required at a ratio of one space for every twenty parking spaces. If the site is
to be served by 208 parking spaces, eleven (11) bicycle parking spaces are required. The Site
Plan as proposed does not feature any bicycle parking spaces.
V. SITE CONSIDERATIONS
Traffic Circulation
Full-access movement is proposed between the parking lot and West North Street. West North
Street is a DelDOT maintained street, and therefore the proposed entrance configuration is
subject to DelDOT review.
Sidewalks/Pedestrian Circulation
Article 5 Section 18 sets the guidelines for sidewalks. The site currently has a sidewalk along the
West North Street frontage. There is a multi-use trail on the south side of West North Street. There
is no existing access from the sidewalk along the West North Street frontage to the site itself, nor is
one proposed. Sidewalks are indicated on the site in the proposed plan immediately surrounding
Buildings 1 and 2, but show no handicap accessible ramps.
Waiver Requested: Partial Elimination of Curbing
The Zoning Ordinance, Article 6 §3.6(b) requires upright curbing for all parking areas and access
drives. The plan does not include curbing for the outer perimeter of the parking lot areas to
facilitate proposed stormwater management. A written waiver request for the elimination of
curbing on the outside of the parking lot was submitted to the Planning Office for consideration by
the City Planner.
Page 58
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 5
Lighting
Article 5 §7.1 stipulates that lighting shall provide no less than 1.5 footcandles at grade. Light
shall also be deflected away from adjacent residential areas and shall not be distracting to traffic
on adjacent roads. There is a note included in the plans that indicate lighting is planned for both the
exterior of the building and from light posts, and that the light will be facing inwards and
downwards so as not to disturb any neighboring properties. The plans do not however indicate any
specific locations for new lighting.
Dumpsters
Article 5 §6.12 states that Office & Retail greater than 50,000 SF requires two (2) dumpsters for the
first 50,000 SF, and one (1) is required for each additional 24,000 SF. With 71,775 SF, this would
mean that three (3) dumpsters are required for the site. The Plans as presented identify a dumpster
pad with an enclosure at the northern end of the side, but does not specify the number of dumpsters
or method of trash collection. The City will not pick up trash and/or recycling from this site. The
applicants must ensure that both the trash collection and recycling needs of the site are met.
VI. BUILDING ARCHITECTURE
The applicant has provided a color rendering showing the western side elevation of the building.
The building has a flat roof and is shown to have two sections. The southern portion of the
building, facing West North Street is Building 2. It is a two-story building, with four (4)
windows on each floor. There is an entrance with a roof structure over it, and a two story
“window wall.” The northern portion, or Building 1, is one story and shows 8 windows as well
as its own entrance with a similar roof covering as is found on Building 2.
The two (2) buildings overall present a cohesive façade of red brick on the first level, and a grey/
beige stucco-like material on the upper level, marked as an “Exterior Insulation System” or
EIFS. There is also a white colored cornice presented at the roofline.
VII. TREE PLANTING AND LANDSCAPE PLAN
The submitted plan set includes a concept for the Landscaping Plan. The total lot area is 5.01 +/-
acres (218,235.6 SF); based on this area, 73 trees are required to meet the tree density
requirements of the site. The applicant proposes to meet this requirement with twenty-five (25)
October Glory Maples to be planted primarily in the central median of the parking lot, thirty-four
(34) Willow Oaks along the main entrance drive and West North Street Frontage, and fourteen
(14) Greenspire Linden trees that are planned to be planted along the western and southern sides
of the buildings. Various shrub plantings are also proposed around the site.
Waiver Request: Opaque Barrier Requirement Alternative Format
Article 5 §7.2 states that visual and sound screening shall be provided on a non-residential use when
abutting a residential use, except in front yard areas. Article 5 §7.22 goes on to require that any
opaque barrier must be accompanied by a durable or continuous evergreen planted screen or a
hedge that will grow to a height of at least six (6) ft. at maturity. The opaque barrier component can
consist of a fence, wall, or berm. The applicant has requested a waiver from the Planning
Commission regarding the opaque barrier requirements of the Zoning Ordinance to eliminate of
fence requirement and to utilize site grading (berm-like) with the required landscaping.
Page 59
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 6
VIII. CITY AND STATE CODE REQUIREMENTS
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with this agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Review and Approval of the Performance Standards Review Application is required for
the property development in accordance with Zoning Ordinance, Article 5 §8.6. A Letter
as the Performance Standards Review Application was submitted for consideration by the
Planning Commission.
2) Eleven (11) bicycle parking spaces shall be provided for the site in accordance with the
requirements of the Zoning Ordinance. Please identify on the plans where such bicycle
parking will be provided.
3) Please indicate the number of dumpsters to be provided within the dumpster enclosure as
well as the method of trash and recycling removal. Details on the requirements for
dumpsters can be found in Article 5, Section 6.12 of the Zoning Ordinance.
4) Pedestrian access into the site must be provided, as well as handicap accessibility to the
sidewalks providing access to the building itself. Details for the Pedestrian access/
sidewalk requirement can be found in Article 5, Section 18 of the Zoning Ordinance.
5) The Applicant must indicate on the plans where any lighting features are planned. Details
for lighting requirements can be found in Article 5, Section 7.1 of the Zoning Ordinance.
6) Identify the curbing type that will be the utilized. Details for curbing requirements can be
found in Article 6, Section 3.6 (b) of the Zoning Ordinance.
7) Sheet 1 (Cover Sheet):
a. In the General Construction Notes column, or in another appropriate notes
column, please add a note indicating that all new utilities to be constructed on site
will be constructed at the expense of the developer.
b. In the General Notes column, for maximum number of parking spaces required,
please correct the figure given from 208 to 209 spaces.
c. Provide the dimension measure on the plan from the building to the nearest
property line.
8) Sheet 4 (Landscape Plan)
a. Clarify the status of the existing trees on the site by identifying their location and
type.
b. Clarify the system proposed to meet the opaque barrier requirement and the
proposed landscaping element (i.e. existing trees or new tree and hedge
plantings).
9) The Applicant has indicated in the general notes that they are aware signs are subject to a
Page 60
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 7
separate review and approval process with the Planning Office. However, the applicant
may identify where on the site the monument sign is/ will be located to assist in design
planning of the site.
10) Any Erosion & Sediment Control Plans and Stormwater Management Plans granted
approval by the Kent Conservation District must reflect the Site Plan layout and design
conditionally approved by the Planning Commission and be in compliance with the
Zoning Ordinance and technical review requirements of other agencies.
11) The Final Plan set must include notes documenting any action taken by the Planning
Commission with regard to requested waivers, and must list any additional conditions of
approval.
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon site development plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Staff recommends, pursuant to Article 10, Section 2.25 on “Landscaping of the site” that
the applicant vary the planting of the tree species. The applicant identifies three (3)
different tree types (25 October Glory Maples, 34 Willow Oaks, and 14 Greenspire
Lindens) to be planted on the site, but has them grouped together based on tree species.
Planning Staff recommends that for the health of the tree species, the tree species be more
varied in their location as a condition of approval.
2) Partial Elimination of Curbing: The City Planner grants approval of the partial
elimination of curbing on the outside of the parking lot area as it will facilitate the
management of stormwater. The Plan should indicate the installation of parking bumpers
at the head of parking spaces lacking upright curbing the area west of the truck parking
canopy.
3) Waiver Request for the Opaque (fence, wall, or berm) Component of the Opaque Barrier
Requirement: Staff recommends approval of the waiver of the opaque barrier component,
as the applicant has indicated in their plans to construct an earth berm along the property
lines that border neighboring residential areas. There is a minimum height requirement of
the berm for full compliance; therefore, this waiver is sought. They have further indicated
their intention to add landscaping on the residential side of the earth berm. The applicant
must identify the intended location of the landscaping on their plans and comply with the
landscape planting of evergreen trees or a hedge with trees in accordance with Zoning
Ordinance, Article 5 §7.22.
Page 61
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 8
4) Performance Standard Review Application: Staff recommends the Commission affirm
that the site’s proposed use as an office building and warehouse building will conform to
all the applicable performance standards of the Zoning Ordinance, Article 5, Section 8.
The proposed use is not expected to generate excessive dangerous or objectionable
elements or emissions.
For a number of the performance standards that are related to air quality, there are state or
federal level permitting requirements that ensure the compliance both during construction
and operation of certain types of facilities, thus limiting impacts to air quality resources.
Some of the performance standards are governed by regulations and policies adopted and
enforced by various City Departments such by fire protection regulations administered by
the City of Dover Fire Marshal and liquid and solid waste disposal which are subject to
the City’s Water/Wastewater Regulations administered by the Department of Public
Works in conjunction with other agencies.
Other agencies may recommend additional conditions and safeguards in accordance with their
areas of expertise. The Recommendations Suggested as Conditions of Approval to Meet Code
Objectives may be accepted or rejected by the Planning Commission.
X. ADVISORY COMMENTS TO THE APPLICANT
1) The Planning Commission should act upon any Waiver Requests as part of any motion to
approve this Site Plan, or as a separate motion if necessary. Note: The recommendations
are at the discretion of the Planning Commission. The Commission may approve or deny
waiver requests.
2) In the event that major changes and revisions to the Site Development Plan occur in the
finalization of the Plan, contact the Planning Office. Examples include reorientation of
the building, relocation of site components like stormwater management areas, and
increases in floor area count. These changes may require resubmittal for review by the
Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations in regards to the plan.
3) In the event that there are changes to the architecture, building footprint, layout or square
footage of the building contact the Planning Office. These changes may require review by
the Planning Commission.
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) Following Planning Commission approval of the Site Development Plan, the Plan must
be revised to meet all conditions of approval from the Development Advisory Committee
or as otherwise noted.
Page 62
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
DAC Report of February 7, 2018
Page 9
6) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
7) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections
and permits are required.
8) Construction may have an effect on adjacent property owners. Any work requiring street
closing or rerouting of residents or visitors should be coordinated as to offer the least
amount of inconvenience.
9) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or
building identification sign may require a Sign Permit from the City of Dover prior to
placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
10) The applicant shall be aware that Site Plan approval does not represent a Building Permit
and associated construction activity permits. A separate application process is required
for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
project contact person or the Planning Office as soon as possible.
Page 63
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 31, 2018
APPLICATION: DGKP Property: Office/Warehouse at 1351 West
North Street
FILE #: S-18-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 64
DGKP Property: Office / Warehouse at 1351 West North Street
File #: S-18-01
January 31, 2018
Page 2 of 4
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
c. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7025 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must
be submitted prior to approval so the meter size can be placed on the final site plan.
5. The proposed water meter must be installed in a pit per City of Dover requirements and manufacturer’s
recommendations. Also, a dual check valve is required downstream of the meter.
6. In the event a property contains multiple principle structures, the property shall be served by a single water main
where a water service line may be provided to each principle structure. Each structure, which is capable of being
offered for sale, shall have its own separate water facilities. A master meter will be required. If a technical infeasibility
exists, please submit a letter to the Department of Public Works for review. A waiver to this requirement may be
granted.
7. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the
building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap
and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is
recommended.
8. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The
Department of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind
flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must
be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall
be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor
to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls
and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
Page 65
DGKP Property: Office / Warehouse at 1351 West North Street
File #: S-18-01
January 31, 2018
Page 3 of 4
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings)
showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County
ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the
proposed location, must be provided on the plan.
8. Sheet #3: The proposed sanitary sewer line connection to the existing manhole at West North Street shall have an
invert at the manhole matching the manhole flow channel.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from KCD is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted
to our office.
SANITATION
1. None.
GROUNDS
1. Only trees listed as small to medium shall be planted under power lines; and no trees shall be planted within ten feet
of any underground water line, sewer line, transmission line or other utility.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. Profiles of all utility crossings, including services, must be provided with the construction plans. All water, sanitary
sewer and storm sewer crossings must be shown on the profiles. Eighteen inches (18”) of cover is the minimum
allowable vertical separation.
3. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
Page 66
DGKP Property: Office / Warehouse at 1351 West North Street
File #: S-18-01
January 31, 2018
Page 4 of 4
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / SANITATION / GROUNDS / GENERAL /STREETS
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. Electric will need projected load requirements to calculate Primary fees.
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Prior to plan approval, the water system plans may be required to be submitted to the Division of Public Health, Office
of Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms
and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be
submitted to the Office of Drinking Water until review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
4. Water impact fees may be required for this proposed site plan.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Prior to plan approval, the sanitary sewer system plans may be required to be submitted to the DNREC, Division of
Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible
for providing all application fees, completed forms and plan sets directly to DNREC.
3. Wastewater impact fees may be required for this proposed site plan.
STORMWATER / GROUNDS / STREETS
1. None.
SANITATION
1. This building shall be served by a private solid waste removal company.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 67
C F
S-18-01 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 02/07/18 D S
O H
V A
E L
R
APPLICATION: Office/Warehouse at 1351 W North St
FILE #: S-18-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is office/warehouse.
2. Building Access shall be no further than 50 feet from a primary entrance
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times
the width of the door(s) or for 10 feet, whichever is greater.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 50% (if warehouse) and clearly shown on the plans.
Perimeter Access minimum width shall be 15 feet measured from the face of the building at grade
with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser
units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere
with emergency services fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3)
5. Fire lanes shall cover 25% of the proposed building.
Page 68
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by
the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be
served by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and
the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one
or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in
height.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located
closer than 15 feet to the exterior wall.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top
and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid
yellow demarcation line shall mark the edge(s) of the fire lane.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150
foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher
than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and
signs shall face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in
lieu of fire lane signs, and shall conform to the specifications of 7.6.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
11. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate.
The owner or their representative shall meet with the Fire Marshal prior to submission to agree
on the system. A letter of agreement shall be created, and signed by both parties. The letter shall
include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to
Page 69
open. A letter of agreement shall be created, and signed by both parties. The letter shall include a
detailed description of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not
less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate
shall be setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
12. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation
and as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4")
demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the
center line of the fire hydrant and extend for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel
bollards filled with concrete and marked yellow shall be installed at the outermost corners of the
fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the
finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be
positioned so as to be facing the edge of the street, or traffic lane.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
13. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel
under the top flange, hydrant bonnets shall be color coded based on the following criteria: class
AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 -
999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM -
painted black.
(2015 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
14. Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal, and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined
to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50
percent of the assessed value of the building and is capable of receiving an occupant load 75
persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall
be required to install a complete fire alarm system in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Page 70
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area
required to be served by the system using the A-weighted scale dBA. In the event the stated
requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting
the intent of this section of the Code.
(City Code of Ordinances 46-171)
15. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and
conditions which are modified by more than 50% after the effective date of these
Regulations. The 50% figure shall be calculated utilizing the gross square footage of the
building, structure, marine vessel, premises and conditions as to arrive at the correct
application.
Any proposal that is presented to the Office of the State Fire Marshal for review and
approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of
the gross square footage of a non-sprinklered building, may not have another such project for the
same building submitted for review and approval any sooner than three (3) years after the date
of the final inspection unless sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling,
manufacturing, processing, display or sale of combustible goods, wares, merchandise, products,
or materials when more than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and
exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment
buildings storage areas except individual unit closets that are located within individual
residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA
101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high
hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the
Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or
private school or public or private institution of higher education. (16 Del.C. Ch. 88) This
Page 71
applies to all such dormitories regardless if new or existing. (2015 State of Delaware fire
Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently
adopted edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an
occupant load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would
create an occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be
sprinklered throughout in accordance with the most recently adopted edition of NFPA 13
when the following apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and
where alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an
occupant load greater than 100 persons and where alcohol will be served for consumption
on the premises.
Any additions or increase in interior size to an existing place of assembly which would
create an occupant load of 100 persons or greater and where alcohol will be served for
consumption on the premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
16. Fire Department Connection is to be a 5-inch stortz connection on a 30 degree elbow
located within 50 feet of main entrance. Access to the Fire Department Connection must
be clear unobstructed access as defined by the AHJ.
17. Parking and/or obstructions shall be prohibited in front of fire department connections
for a distance measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
18. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
19. If there is any type of rack storage, the following will be required: 1) a diagram showing
the layout and type of rack system 2) a list and quantity of items being stored 3) a letter
from an authorized/licensed fire suppression contractor stating that in rack sprinklers
are or are not needed. If in rack sprinklers are not needed, a letter may be requested from
Page 72
an authorized/licensed fire suppression contractor to ensure that the sprinkler system is
adequate for the storage presented.
20. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow
demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from
the center line of the connection and extend for a distance of four feet (4') on both sides, and
where parking is allow between the building and the street or fire lane the solid yellow
demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane
(Markings shall not be required on the sidewalk surface). All fire department connections
(standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT.
CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite
letters on white scotchlite background. The sign shall be clearly visible from the fire lane or
roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2015
Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
21. Standpipes shall be provided in all areas and buildings as required in the codes and standards
listed in Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25
feet in height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and
standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems
shall be installed in accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use
as each floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations,
At the highest intermediate landing between floor levels in every required exit stairway,
Where intermediate landing are not provided, hose connections shall be permitted to be located
at the main floor landings in exit stairways when approved by the authority having jurisdiction,
Where the local fire department has the capability of providing the required pressure,
hydraulically designed standpipe systems in fully sprinklered, non-high-rise buildings shall be
designed to provide the required waterflow rate.
A sign shall be provided at each landing, in all interior stairways, designating the floor level.
(2015 Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
Page 73
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover
Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire
department connections shall be not less than three feet nor more than five feet in height above
finished grade. The fire marshal shall have the authority to require more stringent
requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)
22. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in
concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
inches (four ft.) in height above the finish grade elevation. Any deviation of the stated
requirements must be approved by the fire marshal and/or chief building inspector. The above
dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief
building inspector shall have the authority to require more stringent dimensions to fit the needs
of devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors
shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must
be approved by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
23. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four
inches in height, location, the number shall be placed on the house above or to the left or right of
the front entrance, color, the number shall be contrasting to the background color, Arabic numerals,
all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings
with apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, color, numbers shall
be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic
numerals.
Page 74
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the
street end of the building so as to be visible from either the public or private street or from the
parking lot,
property line or driveway, should the building be located far enough from a public or private road so
that the numbers are not clearly visible from the street, then the street address shall also be
posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on
each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
24. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system
that is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for
any new or existing building where a fire alarm or sprinkler system is being
installed. It shall be the responsibility of the owner or occupant to keep a set of keys
in the secured key box that are current to the locks of the protected occupancy.
Buildings with 24-hour staffing or guard service shall be exempt from this
subsection.
Location. The secured key system shall be located as close to the main entrance as
possible. Should the building design not allow the secured key system to be located
by the main entrance, the fire marshal and fire chief shall come to an agreement as to
an alternate location for the key box. A secured key system, once installed, shall not
be obstructed from view or obstructed by any means that would delay the fire
department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of
ingress or egress, whether on the interior or exterior of the building, and keys to
locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler
controls and any area protected by automatic fire detection. Keys to individual
residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order
the key box for new buildings. It shall be the responsibility of the owner or tenant to
order the key box for existing buildings.
Page 75
Installation before testing. No acceptance test for sprinklers or fire alarms shall be
conducted before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
25. All required means of egress shall have an exit discharge consisting of a non-slip surface, and
leading to and terminating at a public way.
26. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position.
Where two or more new passenger elevators are located in a single hoist way and serve all or the
same portion of the building, only one elevator car that provides a car sized to accommodate an
ambulance cot 24 inches by 84 inches in its horizontal position for each hoist way shall be
required. Elevator cars required to comply with 15.1 or 15.2 shall be identified by the international
symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches
(76 mm) in height and shall be placed inside on both sides of the hoist way door frame.
Firefighter recall keys shall be provided in a manner acceptable to the local fire department.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
27. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO. This must be scheduled in advance with Delaware State
Communications.
28. Project to be completed per approved Site Plan.
29. Full building and fire plan review is required.
30. Construction or renovations cannot be started until building plans are approved.
31. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire marshal’s Office. This work cannot be started until the permit is approved.
32. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Need to clarify if this is office buildings or office/warehouse.
2. If any of the current concrete area is going to be utilized, please contact the Chief
Building Inspector in regard to the same.
3. Need to show the hydrant locations.
4. Need to ensure parking is in compliance with item #6 listed above.
5. Fire alarm system required.
6. Sprinkler system required.
7. Standpipe system required.
a. See item #’s 15, 16, 18, 20, and 21 above in reference to 5, 6, 7).
8. Two Knox boxes required, see item # 24 listed above.
9. Please refer to item # 19 listed above in reference to rack storage.
10. Please refer to item #27 above in reference to required state radio testing
Page 76
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 77
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: January 31, 2018 T
===============================================================
APPLICATION: DGKP Property
FILE#: S-18-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Joshua Schwartz PHONE#: 760-2768
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
The proposed development of the property will need to be analyzed by DelDOT. A pre-
submittal meeting has been held at DelDOT. The submitted plans to DelDOT for review shall
reflect the discussions of this meeting
Additionally, I offer the following general comments to provide guidance as you come
through the DelDOT Record Plan and Entrance Plan process:
The site access on West North Street must be designed in accordance with DelDOT’s
Development Coordination Manual.
A Traffic Impact Study (TIS) will be required for this project, since the proposed
development exceeds 50 VPH (Vehicle per Hour) or 500 VPD (Vehicle per Day). When
the study is completed, DelDOT will review it and send the recommendations of the
improvements to the City. The improvements contained in the study will be implemented
by the developer per DelDOT's discretion. To set up a scoping meeting for this project,
please contact Mr. Troy Brestel at (302) 760-2167 or via e-mail at
Page 78
Troy.Brestel@state.de.us. In addition, if the site generates between 500 and 2000 VPD
and does not exceed 200 VPH the department will allow the proposed development to
make a payment towards an Area-Wide Study Fee in lieu of performing the TIS. The
Area-Wide Study Fee is calculated at $10 per daily trip, and it would be payable to
DelDOT prior to the issuance of a Letter of No Objection. Payment of the TIS would
exempt the developer from performing the study, but would not exempt them from
participation in off-site improvements or a Traffic Operational Analysis if one is required
during the review of the entrance plans. If the developers would like to pay the fee in
lieu of doing a TIS, the developer should contact me at (302) 760-2768.
Section P.5 of the manual addresses fees that are assessed for the review of the
development proposals. DelDOT anticipates collecting the Initial Stage Fee when the
record plan is submitted for review.
In accordance with Section 3.4 of the Manual, a record plan shall be prepared prior to
issuing “Letter of No Objection” review:
Initial Stage Fee Calculation Form
Initial Stage Review Fee
Gate-Keeping Checklist – Site Plan
Design Checklist – Record Plan
Sight Distance Spreadsheet
Owners and Engineers’ name and e-mail address
Record Plan
Conceptual Entrance Plan
Submission of the Area – Wide Study Fee (If applicable)
Referring to Section 3.4.2.1 of the Manual, the following items, among other things are
required on the Record Plan:
A Traffic generation Diagram. See 3.4.2-a for the required format and content.
Depiction of all existing entrances within 300 feet of the proposed entrance.
Notes identifying the type of off-site improvements, agreements (signal, letter)
contributions and when the off-site improvements are warranted.
In accordance with Section 3.5.4.2.A.3 of the Manual, DelDOT will require construction
of a sidewalk/ Shared Use Path along the property frontage of West North Street.
Referring to Section 4.3 of the Manual, an entrance plan shall be prepared prior to issuing
entrance approval. The following information will be required for Entrance Plan review:
Construction Stage Fee Calculation Form
Construction Review Fee
Gate-Keeping Checklist – Entrance Plan
Page 79
Design Checklist – Entrance Plan
Auxiliary Lane Spreadsheet
Entrance Plan
Pipe/ Angle Spreadsheet (If Applicable)
SWM Report and Calculations (If Applicable)
In accordance with Section 5.2.5.6 of the Manual, Turning Movement Diagrams shall be
provided to verify vehicles can safely enter and exit the site entrance. As per Section
5.2.3 of the
Manual, the entrance shall be designed for the largest vehicle using the entrance.
In accordance with Section 5.2.9 of the Manual, the Auxiliary Lane Worksheet should be
used to determine whether auxiliary lanes are warranted at the site entrance and how long
those lanes should be.
In accordance with Section 5.4 of the Manual, sight distance triangles are required and
shall be established in accordance with American Association of State Highway and
Transportation Officials (AASHTO) standards. A spreadsheet has been developed to
assist with this task.
In accordance with Section 5.14 of the manual, all existing utilities must be shown on the
plan and a utility relocation plan will be required for any utilities that need to be
relocated.
Section 7.7.2 of the Manual addresses the need to provide 20-foot wide drainage
easements for all storm drainage systems open or closed, that fall outside the existing
right-of-way or the drainage/ utility easement. In accordance with this section, metes and
bounds and total areas need to be shown for any drainage easements. The easements
should be shown and noted on the record plan.
Section 5.8 requires Stormwater facilities to be a minimum of 20 feet from the edge from
the required Right-Of-Way per the roads functional classification.
If you have any questions or need to discuss any of the above comments, please call the above
contact person and the planning department as soon as possible.
Page 80
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW
2017
APPLICATION: DGKP Property: Office/Warehouse at 1351 West North Street
FILE #: S-18-01
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Jessica L. Verchick, EIT PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE
FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE
APPLICANT:
Source:
2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. Kent Conservation District has no objection to the approval of and/or issuing of permits for the above
referenced site.
ADVISORY COMMENTS TO THE APPLICANT:
1. Davis, Bowen, and Friedel has already held a pre-application to discuss stormwater requirements.
Page 81
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
APPLICATION REVIEW COMMENTARY Planning
D.A.C. MEETING DATE: Organization
APPLICATION: DGKP Property: Office/Warehouse at 1351 West North Street
FILE # S-18-01: REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Jim Galvin, AICP PHONE #: (302) 387-6030
The Dover/Kent County MPO has participated in the State’s Preliminary Land Use Services (PLUS) process for
several months. The MPO requested the opportunity to bring the recommendations on issues of our concern to the
City as well. The MPO will limit comments to projects to development proposals and applications that may lead to
new development. Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by
shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and
pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all
applications, not to be waived.
City of Dover Planning Commission 2/20/2018
Project Review
S-18-01 DGKP Property: Office/Warehouse at 1351 West North Street
The MPO has been asked by the Kenton Road improvement Project Managers to consider a new
DE 8 study to evaluate from Saulsbury Road to Artis Drive given the significant changes to the
corridor over the past 10 years, including the construction of the Dover High School between
Mifflin Road and Artis Drive. It is currently being prioritized among the studies proposed and
will likely be considered in the next few UPWP’s/work programs.
The property has an existing sidewalk at the road frontage and a multiuse path across the street
that serves from Wyoming Mill Road to the DELMARVA Central Railroad tracks at West
Street. However, there is no existing or proposed connection from the frontage into the site
parking lot or building entrance. Please add such a connection.
I saw no bicycle parking or access to the site. As stated above, the City of Dover’s bicycle-
related standards are sufficient for both and should be applied without relief.
The proposal includes office space There is a potential, therefore, for employees to use transit
service to get to the site. The nearest transit stop is at Commerce Way and West North Street
and is connected by sidewalks. I will provide a copy of this report to DART route planners to
consider route expansion.
Page 82
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 83
From: Jamie Sechler
To: Swierczek, Julian D.
Subject: S-18-01 DGKP Property: Office/ Warehouse at 1351 West North Street
Date: Wednesday, February 07, 2018 7:51:46 AM
Julian,
The applicant would like to request a waiver for the upright concrete curbing Article 6, 3.6(b) to
allow for the parking areas and drive aisle to properly drain into adjacent swales. The applicant is
proposing upright curbing around the building, entrance and landscaped islands.
Thank you for your consideration,
Jamie Sechler, P.E. | Associate | Davis, Bowen & Friedel, Inc.
1 Park Avenue | Milford , DE 19963 | www.dbfinc.com
Office: 302-424-1441| Fax: 302-424-0430 | Email: jls@dbfinc.com
Page 84
From: Jamie Sechler
To: Swierczek, Julian D.
Subject: S-18-01 DGKP Property: Office/ Warehouse at 1351 West North Street
Date: Tuesday, February 06, 2018 11:22:24 AM
Julian,
The applicant would like to request a waiver for the opaque requirement for this site. (Article 5,
Section 7.2) The applicant is proposing a landscaped buffer with berm and would like to remove the
fence or wall component of the requirement.
Thank you for your consideration,
Jamie Sechler, P.E. | Associate | Davis, Bowen & Friedel, Inc.
1 Park Avenue | Milford , DE 19963 | www.dbfinc.com
Office: 302-424-1441| Fax: 302-424-0430 | Email: jls@dbfinc.com
Page 85
City of Dover
DATA SHEET FOR MINOR SUBDIVISION PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF February 7, 2018
PLANNING COMMISSION MEETING OF February 20, 2018
Plan Title: Minor Subdivision Plan for 747 North DuPont Highway, SB-18-01
Plan Type: Minor Subdivision Plan
Property Location: East side of North DuPont Highway and south side of Leipsic
Road
Property Addresses: 747 North DuPont Highway
Tax Parcel: ED-05-068.05-01-15.00-000
Existing Site: 25.01 +/- acres
Parcels to be Created: Lot 1: 10.007 acres (435,905 SF)
Lot 2: 15.004 acres (653,574 SF)
Owner: Rojan DD 15 LLC
Zoning Classification: SC-2 (Community Shopping Center Zone)
SWPOZ (Source Water Protection Overlay Zone- Tier 3: Excellent
Recharge Area)
Present Uses: Vacant
Sewer & Water: City of Dover
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 86
City of
Dover
CITY OF DOVER
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: February 7, 2018
APPLICATION: Minor Subdivision Plan for at 747 North DuPont Highway
FILE #: SB-18-01 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Eddie Diaz, Planner I PHONE #: (302) 736-7196
I. PLAN SUMMARY:
Review of a Minor Subdivision Plan application to permit the subdivision of a 25.01 +/- acre
parcel into: Lot 1 of 10.007 acres and Lot 2 of 15.004 acres. The property is located on the
northeast side of North DuPont Highway and south of Leipsic Road. The property is zoned SC-2
(Shopping Center Development Zone) and subject to the SWPOZ (Source Water Protection
Overlay Zone – Tier 3: Excellent Recharge Area). The owner of record is Rojan DD 15 LLC.
Property Addresses: 747 North DuPont Highway. Tax Parcel: ED-05-068.05-01-15.00-000.
Council District 3.
Previous Applications
This property most recently was the subject of a proposal to build a Golden Corral Restaurant.
On February 18, 2015, the Board of Adjustment moved to grant Variance Application V-15-04
to eliminate the maximum parking requirements of the site. The applicant did not follow up with
an application to the Planning Commission, and the Variance has since expired.
The property was rezoned from C-4 (Highway Commercial Zone) to SC-2 (Community
Shopping Center Zone) as part of Rezoning Application Z-07-05. The rezoning was
recommended for approval by the Planning Commission on March 21, 2007 and approved by
City Council on April 9, 2007. The rezoning was followed later that year by Site Development
Plan Application S-07-39 for a 216,650 SF shopping center known as “Dover Crossroads.” This
plan was granted conditional approval by the Planning Commission on August 20, 2007, but has
since expired. The associated Comprehensive Sign Plan US-08-01 for Dover Crossroads also
expired.
This property became subject to the SWPOZ with the adoption of the provisions for the SWPOZ
in 2007 and 2008. In 2011-2012, the property was part of an area that underwent re-evaluation of
its Source Water Protection Overlay Zone status (project #MI-11-16). As a result of the study,
the boundary of the SWPOZ: Tier 3 area was adjusted and approved through application MI-12-
06 Comprehensive Rezoning: SWPOZ Tier 3- Route 13 at Leipsic Road. This Comprehensive
Rezoning was recommended for approval by the Planning Commission in May 2012, and was
approved by City Council on June 11, 2012 (Ordinance #2012-11).
Page 87
SB-18-01 Minor Subdivision Plan at 747 North DuPont Highway
DAC Report of February 7, 2018
Page 2
II. PROJECT DESCRIPTION
This Minor Subdivision Plan proposes to subdivide the main parcel at 757 North DuPont
Highway into (2) separate parcels. See the following Table for summary of the parcels.
Site Proposed Acreage Square Feet
Lot 1 10.007 acres 435,905 SF
Lot 2 15.004 acres 653,574 SF
Total 25.01 acres 1,089,479 SF
Lot 1 is at the southeast end of the overall property and has frontage on North DuPont Highway.
Lot 2 is at the northwest end and has frontage on Leipsic Road. The division will be made by one
new property line struck diagonally across the site. Both proposed lots are currently vacant, with
Lot 1 largely being taken up by parking surfaces and building foundations for the former Berry
Van Lines site and Lot 2 largely being taken up by grass field parking often used for motorsports
and festival events.
III. ZONING REVIEW
SC-2 Zoning District
The property is zoned SC-2 (Community Shopping Center Zone) and is subject to the regulations
of Zoning Ordinance, Article 3 §17 and Article 4 § 4.15. According to Article 3 §17.4, the
design standards of the SC-2 Zone are the same as those for the C-4 (Highway Commercial)
Zone, unless specifically excepted in Article 3 §17 or waived by the Planning Commission. The
following table highlights some of the lot design standards for the SC-2 Zone:
Minimum Required SC-2
Lot Width (ft.) 150
Lot Depth (ft.) 150
Setback from Street ROW (ft.) 50
Setback from Nonresidential Zone (ft.) 50
Setback from Residential zone (ft.) 100
Off-Street Parking Spaces
Per 300 sq. ft. gross leasable area 1
Maximum Permitted SC-2
Building Height:
Stories 6
Feet 75
Floor Area Ratio 4.0
Zoning Ordinance, Article 3 §17.2 states that no area shall be zoned SC-2 unless it is at least 15
acres in size. When the property was rezoned to SC-2 in 2007 it met this criterion. Following the
Page 88
SB-18-01 Minor Subdivision Plan at 747 North DuPont Highway
DAC Report of February 7, 2018
Page 3
proposed subdivision, Lot 1 will be too small to be considered a Community Shopping Center on
its own. Therefore, the subdivision must be accompanied by provisions which link the two
parcels together, by recording cross access and entrance easements, establishing bulk standards
requirements held in common between the parcels, and addressing all other requirements of the
SC-2 Zone for the development as a whole, in order to ensure the two parcels will attain a
unified character in their eventual development.1
SWPOZ (Source Water Protection Overlay Zone)
The entirety of Lot 1 and a portion of Lot 2 are located within the SWPOZ (Tier 3: Excellent
Recharge Area) and are subject to Article 3 Section 29 of the Zoning Ordinance. For Tier 3:
Excellent Recharge Areas, the maximum lot coverage for the portion of the site within the SWPOZ
is 30% unless infiltration is utilized, in which case the maximum lot coverage allowable is 60%.
Any future Site Development Plan submitted for either of the two parcels will need to demonstrate
that the requirements of the SWPOZ are met. The current impervious surface coverage of the site is
unknown.
V. SITE CONSIDERATIONS
Easements
The plan states that a blanket cross access and entrance easement will be recorded with the
subdivision in order to ensure the unified character of the parcels. In addition, the plan depicts
several utility easements originally created for the previous proposed development of the
property (Plat Book Volume 100 Page 84). These easements never had City utilities constructed
in them, and the applicant has stated an intention to extinguish them. According to the City’s
Public Works Department, a number of older utility easements dating to 1994 not currently
shown on the plan are also on the property, and these do contain utilities (Plat Book Volume R54
Page 19). The older, not shown easements cannot be extinguished unless the associated utilities
are also removed, or new easements are recorded.
Setbacks
As the property does not adjoin any residential zones, uniform 50-foot setbacks are proposed on
all lot lines. The plan does not currently specify which of the yards are front yards, side yards, or
rear yards.
Entrances
At present, there are entrances to the site from both North DuPont Highway and Leipsic Road.
Following subdivision, each lot will have at least one entrance. Upon development of the
properties however, the entrances will likely need to be relocated and redesigned to meet the
needs of the new development and DelDOT requirements.
Parking
Article 3 Section 17.5 notes that all shopping centers shall have no less than one parking space
for every 300 square feet of gross leasable area. The parking requirements for the two lots will be
determined when they are proposed for development.
1
A Zoning Verification Letter containing the Planning Office’s interpretation of the SC-2 Zone, with regard to
whether the “contiguous area” had to be one parcel or could be several adjoining parcels, was issued to the applicant
on January 3, 2018. It is from this interpretation that the requirements for cross-access and other linkages come.
Page 89
SB-18-01 Minor Subdivision Plan at 747 North DuPont Highway
DAC Report of February 7, 2018
Page 4
Pedestrian and Bicycle Considerations
According to Zoning Ordinance, Article 5 §18, sidewalks will be required along all street
frontages of the properties upon their redevelopment. The site is currently bicycle accessible,
featuring a bicycle lane along the North DuPont Highway frontage and a wide shoulder along the
Leipsic Road frontage. Both of these tie into the City’s wider bicycle network. DelDOT also has
a multi-use path in design for the North DuPont Highway frontage, which will need to be
accounted for in any future development.
Landscaping and Tree Planting
Landscaping requirements are subject principally to the regulations found in Zoning Ordinance
Article 5 Sections 15 and 16, and are also addressed in other various sections of code related to
buffering, screening, and open space. Based on the 435,905 SF in Lot 1 and the 653,574 SF in
Lot 2, and a required planting rate of one tree per 3,000 SF of development area, the tree planting
requirements of the property could be as high as 146 trees for Lot 1 and 218 trees for Lot 2,
depending on how much of each lot is developed. The properties will be required to provide
landscaping and tree planting when they are developed.
VI. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with this agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) On the plan drawing, please label the yards of each lot as follows:
a. Lot 1:
i) North DuPont Highway frontage: front yard
ii) Curve C2 and newly struck property line: rear yards
iii) All other property lines: side yards
b. Lot 2:
i) Leipsic Road frontage: front yard
ii) Curve C1 and southeastern property line: rear yards
iii) All other property lines: side yards
2) Because the width of the adjacent roads varies, please show the center line of each road, or
other roadway information, in order to confirm compliance with Right-of-Way
requirements. DelDOT may require dedication of additional right-of-way with this plan.
3) Please list the Lands of Dover International Speedway as being zoned RC (Recreation and
Commercial Zone) instead of CPO (Commercial and Professional Office Zone). The
adjoining property was rezoned from CPO to RC on May 9, 2016.
4) Please provide the total square footage of the property in addition to the total acreage.
5) Please provide the square footage and percentage of Lot 2 that falls within the SWPOZ.
6) Please move the note about the site partially being in the SWPOZ from the Notes column to
the Site Data column.
Page 90
SB-18-01 Minor Subdivision Plan at 747 North DuPont Highway
DAC Report of February 7, 2018
Page 5
7) There appears to be one unlabeled existing easement on the property, running along the
southwestern property line of Lot 2, along the northwestern property line of Lot 1, and
cutting across Lot 1 to Lot 1’s southeastern property line.
8) If possible, please provide more information on the existing utility easements, including date
of recordation, whether in currently in use and by whom, and whether they are proposed for
continued usage. Ensure all existing easements are shown on the plan, and specify which
ones are to be extinguished with this plan.
9) Please add the project’s application number, SB-17-02, to the plan sheet.
10) This Record Plan sheet will need to record and document any currently proposed easements,
right-of-way dedications, etc.
11) The Final Plat submitted must include requirements described in Dover Code of Ordinances,
Appendix A: Land Subdivision Regulations, Article IV, C. Plat.
VII. RECOMMENDED ADDITIONAL CONSIDERATIONS TO MEET CODE
OBJECTIVES:
The Land Subdivision Regulations, Article I. Purpose, indicates that the regulations are adopted
in order to promote and protect the public health, safety, convenience and general welfare;
ensure the orderly growth and development of the City, the conservation, protection and proper
use of land, and adequate provision for housing, recreation, circulation, utilities and services; and
safeguard the City from undue future expenditure for the maintenance of streets and public
spaces. Similar safeguards are also in the expressed intent of the Zoning Ordinance, and in the
Site Development Plan objectives listed in subsections Article 10 §2.21 to 2.28.
1) This Minor Subdivision Plan creates two parcels out of one, both zoned SC-2. The
Subdivision Plan complies with the Land Subdivision Regulations. The Subdivision Plan also
includes adequate safeguards to ensure the two parcels will maintain a cohesive character as
a single community shopping center.
Other agencies may recommend additional conditions and safeguards in accordance with their
areas of expertise. The Recommended Additional Considerations to Meet Code Objectives are
offered for consideration by the Planning Commission.
VII. ADVISORY COMMENTS TO THE APPLICANT:
1) This property is potentially impacted by the Dover/Kent County MPO’s 2007 US Route 13
Circulation Study, which proposes several road improvements in the immediate vicinity of
the site. Information on the Study may be found on the MPO’s website at
https://doverkentmpo.delaware.gov/north-dover-study/
2) In the event, that major changes and revisions to the Minor Subdivision Plan occur in the
finalization of the Plan contact the Planning Office. These changes may require resubmittal
for review by the Development Advisory Committee, Planning Commission, or other
Page 91
SB-18-01 Minor Subdivision Plan at 747 North DuPont Highway
DAC Report of February 7, 2018
Page 6
agencies and commissions making recommendations in regards to the plan.
3) Following Planning Commission approval of the Minor Subdivision Plan, the Plan must be
revised to meet all conditions of approval from the Development Advisory Committee or as
otherwise noted. A Check Print must be submitted for review by Planning Office Staff. Upon
determination that the Plan is complete and all agency approvals have been received, copies
of the Plan may be submitted for final endorsement prior to recordation at the Kent County
Recorder of Deeds Office.
4) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
5) A separate Site Development Plan application to the Planning Commission will be required
for future development of either parcel. Any future property line alterations not recorded with
the current application will also be subject to Planning Commission review.
6) Development of the parcels may require review through the Preliminary Land Use Service
(PLUS) process. If the proposed development includes 125 or more residential units or
75,000 square feet or greater of non-residential use, review through the PLUS process is
required prior to submitting an application for Site Development Plan.
7) The applicant shall be aware that Minor Subdivision Plan approval does not represent a Sign
Permit, nor does it convey permission to place any sign on the premises. Any proposed site
or building identification sign may require a Sign Permit from the City of Dover prior to
placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
8) The applicant shall be aware that Minor Subdivision Plan approval does not represent a
Building Permit and associated construction activity permits. A separate application process
is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 92
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 31, 2018
APPLICATION: Minor Subdivision Plan for 747 North DuPont
Highway
FILE #: SB-18-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 93
Minor Subdivision Plan for 747 North DuPont Highway
File #: SB-18-01
January 31, 2018
Page 2 of 2
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
GENERAL
1. Unless the applicant will be utilizing the referenced utility easement areas from Plot Book 100-84 on the site plan, the
applicant shall formally extinguish these lines as there are currently no existing City of Dover Department of Public
Works maintained utilities located in the referenced easement areas. The applicant shall revise the site plan to show
the 1994 recorded easement between the Dover Development Co., Inc and the City of Dover, Volume R54 Page 19,
or extinguish and submit a new easement plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / GROUNDS / GENERAL / STREETS / SANITATION
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 94
C F
SB-18-01 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 02/07/18 D S
O H
V A
E L
R
APPLICATION: Minor Subdivision Plan for 747 N DuPont Hwy
FILE #: SB-18-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. This office has no objections
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 95
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: January 31, 2018 T
===============================================================
APPLICATION: 747 North DuPont Highway (Minor Plan)
FILE#: SB-18-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Joshua Schwartz PHONE#: 760-2768
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
1. Per Section 3.2.5 of the Development Coordination Manual Adopted April,
2016, the Kent County Classification Maps, KCR 007 (North DuPont Hwy) is
classified as a multi lane minor arterial road. If the existing right-of-way does
not have the proper width along the frontage of the site, the department will
require 30 feet of right-of-way from outermost edge of the through lane for
public use.
2. Per Section 3.6.5 of the Development Coordination Manual Adopted April,
2016, an 80-foot wide right-of-way (40-feet from the centerline) is required
for a two-lane minor arterial. According to the Kent County Classification
Maps, KCR 088 (Leipsic Road) is classified as a minor arterial road. If the
existing right-of-way does not have the proper width along the frontage of the
site, the department will require 40-feet of right-of-way dedication from the
physical centerline of road, for public use.
Page 96
3. When development is proposed, this project should be submitted to DelDOT
for a formal review. The site access points on North DuPont Highway and
Leipsic Road must be designed in accordance with DelDOT’s Development
Coordination Manual.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 97
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
2018
APPLICATION: Minor Subdivision Plan for 747 North DuPont Highway
FILE #: SB-18-01
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Jessica L. Verchick, EIT PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN
IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source: 2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. Kent Conservation District has no objection to the minor subdivision of the above referenced site.
ADVISORY COMMENTS TO THE APPLICANT:
1. A detailed Sediment and Stormwater Management Plan must be approved by our office prior to any land
disturbing activity (i.e. clearing, grading, filling, etc.) over 5000 square feet.
Page 98
PETITION TO AMEND ZONING ORDINANCE TEXT
Report to the
Dover Planning Commission
February 20, 2018
Proposed Changes: Text Amendments to the following:
Zoning Ordinance, Article 3 – District Regulations
o Section 28 – Traditional Neighborhood Design Zone
(TND)
28.52 Neighborhood Commercial District,
subsections 28.521 and 28.523
Summary of Amendment: The proposed amendment to allow fuel pumps as a Conditional Use
as accessory to a convenience retail store in the Neighborhood
Commercial District of the Traditional Neighborhood Design Zone
(TND).
Key features of the Provisions:
To allow for fuel pumps as an accessory use to convenience
retail stores in the Neighborhood Commercial District of the
TND zone.
Establishes the review process for this accessory use to be
review by the Planning Commission as a Conditional Use per
Zoning Ordinance, Article 10, Section 1 – Approval of
Conditional Uses.
Eliminates the exclusion of gasoline filing stations as a type
of service establishment.
Request for Amendment: This Request for a Text Amendment was received by City Council
from a constituent request. The associated Ordinance to adopt such
Text Amendment is sponsored by Councilman Cole, Councilman
Lindell, and Councilman Polce.
Process: The Legislative, Finance, and Administration Committee reviewed
the proposed Text Amendment on December 12, 2017 and the First
Reading occurred on January 8, 2018. A Public Hearing before the
Planning Commission is scheduled for February 20, 2018 and a
Public Hearing and Final Reading before City Council is scheduled
for March 12, 2018.
Ordinance Number: Proposed Ordinance #2017-16
File Number: MI-18-01
Page 99
MI-18-01 Text Amendment: Zoning Ordinance Article 3 Section 28 for Fuel Pumps as Conditional Use in TND Zone
DAC Report Summary
Page 2 of 8
Request for Text Amendment
The initiation of a proposed Text Amendment to the Zoning Ordinance can occur in several ways
as per Article 10 §5. Proposals for Zoning Text Amendment can be initiation by the City Planner
or can be under the sponsorship of three members of City Council. This proposed Text
Amendment was a constituent request to City Council received from John W. Paradee on behalf of
Pettinaro; three members of City Council are sponsoring the request.
Process for Review of Proposed Text Amendments
As text amendments are proposed to the Zoning Ordinance, a Public Hearing and
Recommendation by the Planning Commission is required. Then City Council will conduct a
Public Hearing and take Final Action on the proposed Ordinance #2017-16 at their meeting of
March 12, 2018. The Zoning Ordinance also outlines the requirements for a report evaluating the
proposed amendment. See Code excerpt below.
Article 10 Section 5. Amendments
5.2 Procedure for zoning text amendments in accordance with subsection 5.11.
5.21 Public hearing and notice. An amendment to the ordinance text shall be
subject to public hearing before the planning commission and city council prior to
adoption. Such hearing shall be advertised in a newspaper of general circulation at
least 15 days prior to the planning commission hearing. Such notices shall state the
date, time and place of the planning commission and city council hearings and a brief
description of the proposed zoning text amendment, and specify that documents are
available in the planning office for review.
5.22 City planner report. For each proposed zoning text amendment, the city
planner shall issue a report to the planning commission and city council, including
comments from other reviewing agencies, that evaluates the following factors:
(A) Whether such change is consistent with the aims and principles
embodied in the ordinance as to the particular zones concerned; and
(B) Whether such proposed amendment is consistent with the aims of the
comprehensive plan of the city.
5.23 Report of the planning commission. Regarding each proposed amendment to
the ordinance text, the planning commission shall provide a report to the city council
stating a recommended action with regards to the proposed amendment, along with
the commission's evaluation of the following factors:
(A) Whether such change is consistent with the aims and principles
embodied in the ordinance as to the particular zones concerned; and
(B) Whether such proposed amendment is consistent with the aims of the
comprehensive plan of the city.
Consideration of Text Amendment by the City Planner
This Text Amendment is a proposed amendment to the Traditional Neighborhood Design (TND)
zoning district. The following provides some background information on this unique zoning
district.
Page 100
MI-18-01 Text Amendment: Zoning Ordinance Article 3 Section 28 for Fuel Pumps as Conditional Use in TND Zone
DAC Report Summary
Page 3 of 8
Traditional Neighborhood Design (TND) Zone
History of Development of the TND Zoning District and Its Provisions
The development of the Traditional Neighborhood Design Ordinance began circa 2002-2004 with
discussions of the future of the Eden Hill Farm property. A working group involved the property
owners, DelDOT, the Office of State Planning, the City of Dover, consultant WRT (Wallace,
Roberts & Todd), and others. During the same timeframe, the City’s 2003 Comprehensive Plan
included a goal to create a new zoning district for a Mixed Use Traditional Development Zone
focused on a mixed commercial, residential, and employment uses which are developed in a
traditional town pattern (commonly known as “neo-traditional” or “new urbanism.” Following
collaboration of the City Planning Office, the consultant, and others, the resulting draft Ordinance
for a new zoning district (TND) was reviewed and recommended by the Planning Commission in
Summer-Fall 2004.
On November 8, 2004 the Dover City Council approved an amendment to the City of Dover Code,
Appendix B: Zoning Ordinance, Article 3 - District Regulations creating Article 3, Section 28:
Traditional Neighborhood Design Zone (TND). (Application MI-04-05) The amendment
established the development criteria, uses, and procedure for the Traditional Neighborhood Design
Zone (TND). The first step of the Traditional Neighborhood Design Zone is an application for
rezoning to TND which includes review of a Master Plan. The subsequent steps in the process for
development of a TND include review of the Implementation Plan and Site Plans/Subdivision
Plans.
As the Zoning Ordinance states, “the intent of the Traditional Neighborhood Design (TND) zone is
to create a walkable and pedestrian-friendly, economically viable professional, commercial and
mixed use residential neighborhood for people of different ages and incomes that draw from the
best architectural and community design features of Delaware and the Delmarva Peninsula from its
colonial past to the mid-20th century. Its intent is also to preserve and enhance the natural
landscape, celebrate the history of the site, and buffer the development from adverse external
influences.” The TND zone intends to encourage greater integration of land-uses and diversity of
lot sizes than is permitted under other provisions of the Land Subdivision Regulations and Zoning
Ordinance of the City of Dover.
The first area (and currently the only area) of Dover to be rezoned to the Traditional Neighborhood
Design (TND) zone is the Eden Hill Farm property. In 2005, it was rezoned to TND with Rezoning
Application Z-05-03. The Eden Hill Farm TND has approved Implementation Plans for a
Residential District, a Neighborhood Commercial District, and a Professional Office, Medical &
Financial District. Development activities have occurred in each district area and development is
subject to Comprehensive Design Standards Manuals (Pattern Books).
2008 Comprehensive Plan
In the 2008 Comprehensive Plan, Chapter 12: Land Development Plan discusses Mixed Use
Areas. Table 12-1 Land Use and Zoning Matrix outlines the possible zoning categories for each of
the land use classifications (2008 Comprehensive Plan, page 162). The Traditional Neighborhood
Zone zoning district is found in only the Land Use Category of Mixed Use. See excerpt below.
Page 101
MI-18-01 Text Amendment: Zoning Ordinance Article 3 Section 28 for Fuel Pumps as Conditional Use in TND Zone
DAC Report Summary
Page 4 of 8
Excerpt of Table 12-1 Land Use and Zoning Matrix
2008 Comprehensive Plan (as amended), page 162
Land Use Category Zoning District
C-2 (Central Commercial) (Downtown Target Area Only)
C-2A (Limited Central Commercial)
TND (Traditional Neighborhood Design)
C-1 (Neighborhood Commercial)
C-1A (Limited Commercial)
RGO (General Residence and Office) (Downtown Target
Area Only)
Mixed-Use R-8 (One Family Residence)
R-10 (One Family Residence)
RG-1 (General Residence)
RG-2 (General Residence)
RG-4 (Multi-Story Apartments)
C-3 (Service Commercial)
CPO (Commercial/Professional Office)
IO (Institutional and Office)
In addition, the 2008 Comprehensive Plan discusses the area of Eden Hill Farm. Specifically, the
Comprehensive Plan identifies the following goal in Chapter 12:
Excerpt from Chapter 12: Land Development Plan
2008 Comprehensive Plan (as amended), page 149
Eden Hill Farm
Eden Hill Farm is the City’s first Traditional Neighborhood Design development.
Construction of this mixed-use community is currently underway and will continue to
move forward during this five year planning horizon. Eden Hill Farm comprises 272 acres
of land including a medical/professional office district, commercial district, residential
district, and open space areas. The overall Master Plan for the TND and implementation
plans for each district are complete. It will be important for the City to ensure that the
intent of the Master Plan Comprehensive Design Standards Manual (Pattern Book) and
Traditional Neighborhood Design concept remain in the forefront as the various phases
unfold.
Goal: Eden Hill Farm
1. Continue to facilitate project development processes for construction in accordance
with approved Master Plan Pattern Book and TND concept.
2. Support efforts to implement the road and walking trail connections linking Eden Hill
Farm TND to the existing circulation network.
3. Encourage quality architecture within the development in accordance with the Pattern
Book and intent of the TND Ordinance.
4. Participate in the planning for the project’s open space areas including the area of the
historic farm complex, alleys, and southern portion of the project near Puncheon Run.
Page 102
MI-18-01 Text Amendment: Zoning Ordinance Article 3 Section 28 for Fuel Pumps as Conditional Use in TND Zone
DAC Report Summary
Page 5 of 8
Review of Zoning Ordinance Provisions
The intent of the Zoning Ordinance is “to provide for the orderly and desirable development and
use of land” with the ordinance “providing the specifications, procedures and a precise plan to
guide new development while improving, conserving or facilitating desirable change in the
existing portions of the City.” Article 1 §2 outlines a series of objectives to further the purpose of
protecting and promoting the general welfare.
Traditional Neighborhood Design (TND) Zone
The Traditional Neighborhood Design (TND) Zone also begins with a purpose and intent
statement.
Article 3
Section 28. - Traditional Neighborhood Design Zone (TND).
28.1 Purpose and intent. The intent of the Traditional Neighborhood Design (TND) zone is to
create a walkable and pedestrian-friendly, economically viable professional, commercial and
mixed use residential neighborhood for people of different ages and incomes that draw from the
best architectural and community design features of Delaware and the Delmarva Peninsula from
its colonial past to the mid 20th century. Its intent is also to preserve and enhance the natural
landscape, celebrate the history of the site, and buffer the development from adverse external
influences. The provisions of this section are intended to encourage greater integration of land -
uses and diversity of lot sizes than is permitted under other provisions of the Land Subdivision
Regulations and Zoning Ordinance of the City of Dover. Lastly, it may provide locations for other
uses that will aid in the fulfillment of the City of Dover's Comprehensive Plan and allow people to
live near their work.
Comparison of Uses in Commercial Zoning Districts
In the evaluation of the proposal for Fuel Pumps as a Conditional Use in the Neighborhood
Commercial District of the TND zoning district, the following summary of uses in comparable
commercial zoning districts is given. The focus is on the commercial (non-residential) uses in each
zoning districts, but the complete listing of uses can be found in the various sections of Zoning
Ordinance, Article 3. The evaluation only looks at the commercial zoning districts that are also
identified in the Mixed Use Land Use Category.
Zoning Permitted Uses Conditional Uses Prohibited Uses
District
C-1 Retail stores* ---- Fuel pumps
Personal Service establishments* Motor vehicle storage,
Restaurants* sales, or repairs
Drive-throughs
* Uses are limited in size to 2,500 SF per Liquor stores
establishment Fire arm sales
Tobacco shops
C-1A Retail stores Drive-throughs Fuel pumps
Personal Service establishments accessory to a Motor vehicle storage,
Service establishments permitted use sales, or repairs
Restaurants
Business, professional & government
offices
C-2 Retail stores Parking Lot and Fuel pumps
Restaurants Parking Structures Motor vehicle storage,
Hotels, bed & breakfast inns as principal use sales, or repairs
Art galleries and studios Places of public
Page 103
MI-18-01 Text Amendment: Zoning Ordinance Article 3 Section 28 for Fuel Pumps as Conditional Use in TND Zone
DAC Report Summary
Page 6 of 8
Service Establishments assembly
Business, professional & government Manufacturing with
offices conditions
C-2A Retail Stores Parking Lot and ----
Business, professional & government Parking Structures
offices as principal use
Personal service establishments Fuel pumps
Restaurants accessory to
Service establishments permitted use
Hotels
Places of public assembly
Drive-throughs
C-3 Service establishments Crematory subject ----
Personal service establishments to requirements
Business, professional & governmental
offices
Retail uses accessory to permitted use
Drive-through accessory to permitted
use
Wholesale, storage and warehousing
establishments
Indoor Recreation and amusement
establishments
Motor vehicle, boat, or farm equipment
sales or service subject to regulations
Manufacturing with conditions
Mini-storage facilities subject to
regulations
CPO Business, professional & government Conditional use
offices accessory to
Banks permitted use on lot:
Medical Laboratories cafeteria, restaurant,
Drive-in Facilities accessory to barbershop,
permitted use beautyshop, copy
center, office supply,
retail store,
newsstand, spa &
health club,
associated
laboratories
TND Neighborhood Commercial District: ---- Drive-through
Civic uses restaurants
Convenience retail stores (drug stores, Gasoline filing stations
grocery stores, restaurants, variety Motor vehicle storage,
stores) repair or service
Drive-through drugstores with
conditions
Personal service stores (barber shops,
beauty parlors, laundry/dry cleaning
establishments)
Service establishments furnishing
services other than personal nature
Business, professional & government
offices
Banks
Drive-through banks with conditions
Philanthropic or not-for-profits offices
Financial Institutions
Page 104
MI-18-01 Text Amendment: Zoning Ordinance Article 3 Section 28 for Fuel Pumps as Conditional Use in TND Zone
DAC Report Summary
Page 7 of 8
Review of these commercial zones shows that the uses of the TND: Neighborhood Commercial
District are most comparable to the uses in the C-2 and C-2A zoning districts. In comparison, the
use of fuel pumps is specifically prohibited in the C-2 zone while the C-2A zone allows fuel
pumps as an accessory to a permitted use through the Conditional Use process.
The Conditional Use process is outlined in Zoning Ordinance, Article 10 §1. With Conditional Use
Applications, the Planning Commission reviews the proposed project to determine whether or not
the intended use is appropriate in type and scale for the immediate neighborhood. The Commission
must also consider whether or not the proposed use will have an adverse impact on the future
orderly development of the surrounding area. It outlines a series of objectives for consideration of
a Conditional Use including such items as accessibility for emergency response and the harmony
of location, size and character.
Agency Review of Text Amendment
As part of review by Development Advisory Committee (DAC) members, the Planning Office
received comments from the Department of Public Works, Office of the Fire Marshal, and
DelDOT.
City Planner’s Recommendation Regarding Text Amendment
The City Planner’s recommendation must address the following factors as noted in Zoning
Ordinance, Article 10 §5.22:
(A) Whether such change is consistent with the aims and principles embodied in the
ordinance as to the particular zones concerned; and
(B) Whether such proposed amendment is consistent with the aims of the comprehensive
plan of the city.
The Traditional Neighborhood Design (TND) zone allows for a mix of uses from residential to
commercial with the intent to create a mixed-use community neighborhood. A variety of
commercial uses are permitted in the Neighborhood Commercial District of the TND zone. A
review of the types of commercial uses in the TND zoning district with similar commercial
districts like the C-2 and C-2A zones show comparable uses. While this review shows that fuel
pumps are specifically prohibited in C-2 zone, fuel pumps can be considered through a Conditional
Use process when they are accessory to a permitted use in the C-2A zone. This amendment
proposing fuel pumps as an accessory use to a permitted use and to require review as a Conditional
Use in the TND zone would be consistent with the C-2A zone which is also part of the Land Use
Category of Mixed Use as found in the Land Development Plan of the 2008 Comprehensive Plan.
This amendment would only allow the fuel pump use to be established in the Neighborhood
Commercial District of the TND and not within the Residential District or the Professional Office,
Medical & Financial District TND. In addition, it could not be the primary use but must be an
accessory use that is incidental to a primary use.
The requirement for review of the fuel pump use as a Conditional Use is important as during that
review process the compliance with the intent and development provisions of the Traditional
Neighborhood Design zone can be carefully analyzed and the appropriate conditions added to
ensure compatibility with the neighborhood. This review process will assist in safeguarding the
goals established for the Eden Hill Farm in the 2008 Comprehensive Plan. This amendment adding
an accessory use to the commercial uses will continue to facilitate opportunities for development
Page 105
MI-18-01 Text Amendment: Zoning Ordinance Article 3 Section 28 for Fuel Pumps as Conditional Use in TND Zone
DAC Report Summary
Page 8 of 8
in the TND zone while ensuring construction is completed in accordance in the General Overall
Master Plan/Implementation Plan and the Comprehensive Design Standards Manual (Pattern
Book) for the specific Traditional Neighborhood Design project. The ongoing review of the types
of commercial uses permitted is a necessity to reflect a changing economy and market conditions.
This also corresponds with the 2008 Comprehensive Plan’s Land Development Plan goal for
Commercial Land Uses to provide citizens “with convenient access to needed goods and services
through well designed and spaced community and neighborhood commercial centers.”
Advisory Comments
The applicants shall be aware that recommendations and/or approval of a text amendment to the
Traditional Neighborhood Design Zone does not represent approval of a development plan or use.
A specific application process must be completed prior to commencement of construction
activities.
Page 106
CITY OF DOVER
APPLICATION REVIEW COMMENTARY
JANUARY 31, 2018
APPLICATION: Text Amendment Zoning Ordinance, Article 3
Section 28 for Fuel Pumps as Conditional Use in
TND zone
FILE #: MI-18-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. No objections to the proposed amendments.
WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
2. Our office has no objections to the proposed text amendments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
GENERAL
1. Convenience retail stores shall be required to follow all federal and state guidelines when installing fuel pumps to their
site.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. None
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 107
C F
MI-18-01 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 02/07/18 D S
O H
V A
E L
R
APPLICATION: Text Amendment Zoning Ordinance Article 3 Section 28 Fuel Pumps
FILE #: MI-18-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. This office has no objections.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 108
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: January 31, 2018 T
===============================================================
APPLICATION: Text Amendments: Zoning Ordinance, Article 3 Section 28
FILE#: MI-18-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Joshua Schwartz PHONE#: 760-2768
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no comments
If you have any questions, please call the above contact person and the planning
department as soon as possible.
Page 109
FIRST READING
CITY OF DOVER ORDINANCE #2017-16
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3
4 That Appendix B - Zoning, Article 3 - District Regulations, Section 28 - Traditional Neighborhood
5 Design Zone (TND), Subsection 28.52 – Neighborhood Commercial District, of the Dover Code, be
6 amended by inserting the text indicated in bold, blue font and deleting the text indicated in red strikeout
7 as follows:
8
9 28.52 Neighborhood commercial district: Additional uses permitted in this district include the following
10 subject to the requirements set forth in subsection 28.7:
11 28.521 Convenience retail stores such as, but not limited to, drug stores, grocery stores,
12 restaurants, variety stores, or combinations thereof. Fuel pumps accessory to a convenience
13 retail store may be permitted as a conditional use, upon the approval of the Planning
14 Commission in accordance with the procedures and subject to the general conditions set
15 forth in article 10, section 1. Drive through drug stores shall be allowed if they are of superior
16 design and screening consistent with the intent of the TND zone. There shall be no drive-through
17 restaurants.
18 28.522 Personal service stores such as, but not limited to, barber shops, beauty parlors, and
19 laundry/dry cleaning establishments.
20 28.523 Service establishments furnishing services other than of a personal nature, but excluding
21 gasoline filling stations and motor vehicle storage, repair, or service.
22 28.524 Business, professional, and government offices, banks, philanthropic or not-for-profit
23 offices, and financial institutions. Drive through banks shall be allowed if they are of superior design
24 and screening consistent with the intent of the TND zone.
25 28.525 Any of these uses mixed with residential uses in the same building.
26
27 ADOPTED: *
28 S:\ORDINANCES\2017\DRAFT\ORDINANCE #2017-16 APPDX B, ART 3, SEC 28 (TND), SEC 28.52 - NEIGHBORHOOD COMMERCIAL DIST\ORDINANCE #2017-16 APPDX B, ART 3.doc
29
30
31 SYNOPSIS
32 This Ordinance would allow the Planning Commission to approve a convenience retail store with fuel
33 pumps as a conditional use in the Traditional Neighborhood Design (TND) Zone.
34
35 (SPONSORS: COLE, LINDELL, AND POLCE)
36
37
38 Actions History
39 01/08/2017 - Scheduled for First Reading – City Council
40 12/12/2017 - Introduction – Council Committee of the Whole/Legislative, Finance, and
41 Administration Committee
Page 110
Appointment of the Architectural Review Oversight Subcommittee of
Planning Commission
As part of the Annual Meeting of the Planning Commission, one of the responsibilities of the
Planning Commission is to appoint the Architectural Review Oversight Subcommittee. The
following excerpt from the Zoning Ordinance is provided.
Appendix B: Zoning Ordinance, Article 10 Section 2. Site development plan approval.
2.28 Consideration shall be given to the physical orientation and architectural characteristics
of proposed buildings, the relationship of proposed buildings to existing buildings and to
other proposed buildings, and their contributions to the overall image of the immediate
vicinity by considering the building and architectural design guidelines as set forth in article
5, section 19. Design characteristics of proposed buildings and building additions shall not
detract or devalue existing buildings in the immediate vicinity.
(A) If the planning commission determines that the proposed physical orientation and
architectural characteristics of the proposed buildings do not meet the intent and
objectives of this section, then the planning commission shall refer the proposal to
the architectural review oversight subcommittee for review and comment.
(B) The subcommittee shall meet and review the proposal with the applicant, and return
its comments to the planning commission by the next regularly scheduled meeting.
(C) The architectural review oversight subcommittee shall be appointed by the
commission at its annual meeting, and membership shall consist of two planning
commission members, and two design professionals with experience in construction,
and the mayor or the mayor's designee. Two alternate design professionals with
experience in construction shall also be appointed.
As part of the Annual Meeting of the Planning Commission shall appoint the membership of the
Architectural Review Oversight Subcommittee. This is an opportunity to consider individuals to
serve on this subcommittee.
At the Annual Meeting of the Planning Commission on December 18, 2017, the following
individuals were appointed to the Architectural Review Oversight Subcommittee of Planning
Commission.
o Kathleen Welsh, Planning Commission member
o Dean Holden, Planning Commission member
o Mayor or Mayor’s designee
The Planning Commission directed Planning Staff to contact other the previous Subcommittee
members to determine their willingness to continue as a member.
o Ms. Sarah Keifer, Director of Planning Services for Kent County, Design Professional
o Dr. R.G. Chandler, former Director of Architecture at DelTech Community College,
Design Professional
o Alternates (Design Professionals): To Be Determined
Update on Architectural Review Oversight Subcommittee of the Planning Commission 2-9-2018