DRAFT
Bicycle Pedestrian Sub‐Committee
Dover City Hall Large Conference Room
Dover, DE
October 2, 2018
*** DRAFT ***
Members Present: Others Present:
Chris Asay, Jayce Lesniewski, Dave Moses, Gerry Carolyn Courtney, Margie Cyr,
Pennington, Fran Riddle, Eddie Diaz, Helen Wiles
INTRODUCTIONS
CALLED TO ORDER: Meeting opened at 5:01 P.M.
CHAIR
Chairman Pennington introduced himself as the newly appointed Chair with the resignation of Mr. Hutchison. The group
welcomed him as chair and offered their support.
Mrs. Cyr introduced Helen Wiles of the MPO. Mrs. Wiles is the Public Outreach Manager for the Kent County MPO
replacing Kate Layton. She was welcomed by the members.
AGENDA
Chair Pennington asked for approval of the Agenda. Mr. Moses asked to have time for a Glo Rides on the Agenda. It’s a
night time ride other communities are doing such as Milford. It was noted to add to the November agenda.
Mr. Asay asked if the Agenda and minutes have to be posted a certain amount of time before a meeting. Answer stated
was 7 days for the agenda and packet information is 48 hours.
The Agenda was then accepted without objection.
MINUTES
Chair asked for an approval of the minutes of September minutes as presented. With no changes, the minutes were
approved and accepted without objection.
MS. WILES ASKED IF THE MPO WAS A VOTING MEMBER OS THIS COMMITTEE? MS. ASAY NOTED SHE SERVES AS STAFF SIMILAR TO JOHN FIORI
WITH DELDOT.
OLD BUSINESS
DELAWARE BICYCLE COUNCIL INNOVATION GRANT
In Mr. Fiori’s absence, Mrs. Cyr recited an email update on this project. (Attachment 1)
Delaware Bicycle Council Innovation Grant
On September 19th, I e‐mailed Margie the following: The working group met on September 18th to determine a
nomination for the grant. I am unable to say who but Dover was not ranked first. However there were residual
funds in which the working group could make a second nomination. On the application $20,000.00 was requested
and during the field meeting it was indicated that the feasibility study could range from $8,000 ‐ $25,000+ since
an actual estimate for the study has not been determined. If awarded a partial grant amount;
Would the City be able to find additional funding to cover the cost? Understand that it will
depend on the grant amount and the actual estimate for the study.
Is there a bare minimum grant amount the City could accept and still keep the study moving
forward?
Would the City be able to secure the additional funding and spend that grant amount on that
study prior to the deadline of June 30, 2019? Any grant awarded must be spent prior to the end
of the State Fiscal Year. Keep in mind the money must be spent, the study does not need to be
completed.
Page 2
DRAFT
This information is needed prior to the October 3rd council meeting in order for the Council to vote on the grant.
Mrs. Cyr noted the answers to the questions based on the City Manager’s response is:
1) No, the City could not cover the additional costs.
2) There is not bare minimum in the budget to keep the project moving.
3) No, the City would not be able to secure the additional funding.
Mr. Asay asked which fiscal year the City Manager was referring FY18, FY19? Mrs. Cyr noted the current which is FY19.
This grant must be spent prior to June 30, 2019. If we want to apply for a grant for next year, we need to include this in
the City Capital Budget requests. I will include this in the budget request. I will tell you, we have been told there is no
extra money. I am not optimistic this will be funded.
Mr. Asay said the President of the MPO made the suggestion if we were unable to get funding from the city, we could
come to the MPO and that’s one possibility we might want to look into. Now that of course, would not mean 2019
funding but 2020 funding, because the MPO has finalized their 2019 funding. Mrs. Cyr noted she could reach out to Mr.
MacMillan on this possibility. Also, on the Delaware Bike Council grant, in the past like a dozen communities applied for
grants but for 2018 there were only four, one of the four was bicycle racks. The commission is not really interested in
that, so there only 3. Two were tied for first and we were third. So, if John is saying other funding might be available
maybe the second community is taking the money. I will talk to them to see why our application was lower than the
other two.
CONSTRUCTION UPDATES
Mrs. Cyr recited the emailed update from Mr. Fiori:
Construction Projects (DelDOT)
I have no revised updates from the last meeting but would like to add the following: The open end contract has
completed construction for repaving the shared‐use path along north side of Forrest Avenue from Kenton Road to
Saulsbury Road; along the west side of Saulsbury/McKee Road from Forrest Avenue to College Road; and along
the south side of Hazlettville Road from P.O.W./MIA Parkway to Schutte Park. Also the 640’ section of 5’ wide
sidewalk along the east side of Saulsbury Road beginning at Royal Farms has been widened to 10’ to match the
sidewalk to the north and south.
If any subcommittee member is interested, the ribbon cutting ceremony for the Brecknock Park shared‐use path
from the park entrance to P.O.W./MIA Parkway is scheduled for Wednesday October 3rd at 3:00 p.m.
Mr. Asay asked about the flashing beacons as he thought they would be done by the end of September? Mrs. Cyr noted
nothing was mentioned on that project.
DOVER TREASURE HUNT
Ms. Riddle noted we had our meeting with interested parties to see if this is still a good idea and no one showed up other
than our planning group. So there is a sign, that support may not be there. The eight of us had a great meeting and
bounced new ideas on how to go forward with a scaled back version. We will be meeting again to discuss how to move
this forward on November 8 at 4 pm, at the Grey Fox.
Mrs. Cyr noted, I think the Open Streets program has taken a lot time and energy from a lot of people. It might be that
there was some solidity of planning and people are just overwhelmed. Ms. Riddle noted, I totally agree, Open Streets
has taken a lot of energy. Again, we are going to meeting November and see where we go from there. Other comments
noted while Open Streets has been a good program, it has taken a lot of energy.
BIKE FIX‐IT STATION
Ms. Courtney noted we are working with our Public Work department on getting the concrete poured. We hope before
the weather gets to cold.
Page 3
DRAFT
DOVER DUATHLON
Ms. Courtney noted the Duathlon Committee met recently. We are going to start rolling out Save the Date post cards,
and sponsor solicitation. April 6, 2019 is the date.
PEDESTRIAN ISSUES
Mrs. Cyr noted Public Works is working on the tree issue. This is a report, on page 5 there is a page ranking on how the
sidewalk are ranked and the other handout is a form for reporting sidewalk issues. Attachment 2.
Discussion on how to find this on the city website and the form for reporting issues such as sidewalks in need of repair or
overgrowth of vegetation. Mrs. Cyr will look into how visible this is for the public. I got it because I asked.
Public Comment and Response Form, Department of Public Works is the form’s proper name. Some discussion took
place on funding these projects. Mrs. Cyr noted while it is city budget, she did not how Public Works allocated funding to
these projects. Mr. Diaz reported, go to the public works page, on the side bar you will see the link: American with
Disabilities Act Transition Plan Response and Sidewalk Form.
Ms. Asay asked Mr. Lesniewski if the vegetation issues he brought up previously had been addressed. Mr. Lesniewski
responded, no. The thing that gets him, is by the city building on Kings Highway. (Section between Reed Street and old
library). Mrs. Cyr noted that is included in this year’s funding list. Mr. Moses noted vegetation is a problem that is how
my wife broke her hand, because of vegetation and a stump protruding on the sidewalk. This could cause something to
into traffic or cause injury. Mr. Lesniewski noted in particular on Division Street (north side of Division, between
Pennsylvania & Maple is a problem, because it really does force you on the street. Mr. Moses felt there are a lot of areas
not just here referring to the Kings Highway and Division. Discussion lead into land owner verses city for maintenance
and enforcement of the city code.
Mr. Lesniewski noted the Green sidewalks seem difficult for wheelchair access. It seems the curbs are pretty tall. Is that
something the city would look at for accessibility? I feel this could be a problem for handicaps. I know the Capital Station
Development is coming. I noticed the sidewalk is closed. Will it be closed until spring? Mrs. Cyr thinks probably as for
safety issues until they are completed.
DOVER PAL
Mrs. Cyr noted the memo received from Officer Smith, memo included as a packet item. She also shared the following
from Mr. Fiori:
Dover PAL – Bicycle Program Update
Officer Smith and I discussed this morning and he is going to use the DelDOT bikes to determine how many
students know how to ride a bike. He is going to borrow the bikes for October 3rd, 4th and the 18th. He will be able
to get an idea how many students can ride and to see if this is a viable program to continue.
ANNOUNCEMENTS
Mr. Asay noted the bicycle fatality on Rt13 and College Road. I’ve asked for Dover Police to give us a report. Mrs. Cyr
noted they have noted this is an active investigation and they will not report to us during their investigation. Mr. Asay
wants to have this on agenda in the future once the police are ready.
Ms. Wiles noted they are working on getting updates on all projects to get a handle on all the bike and pedestrian plans
that are currently out there. Mike Ward was also hired as our GIS man. We are working on interactive maps, one is
planned to a comprehensive Kent County bike map. Please include us on these plans as we moved.
ADJOURNMENT
With no further business, we adjourned at 6:05 pm
Page 4
DRAFT
Courtney, Carolyn
From: Fiori, John (DelDOT) <John.Fiori@state.de.us>
Sent: Tuesday, October 02, 2018 1:51 PM
To: Courtney, Carolyn
Subject: RE: Bicycle and Pedestrian Subcommittee: Tuesday, October 2, 2018
Hi Carolyn,
I had something come up at the last minute and will not be able to attend tonight’s meeting. The following are
updates I have for “Old Items”;
Delaware Bicycle Council Innovation Grant
On September 19th, I e-mailed Margie the following: The working group met on September 18th to determine a
nomination for the grant. I am unable to say who but Dover was not ranked first. However there were residual
funds in which the working group could make a second nomination. On the application $20,000.00 was
requested and during the field meeting it was indicated that the feasibility study could range from $8,000 -
$25,000+ since an actual estimate for the study has not been determined. If awarded a partial grant amount;
Would the City be able to find additional funding to cover the cost? Understand that it will depend
on the grant amount and the actual estimate for the study.
Is there a bare minimum grant amount the City could accept and still keep the study moving
forward?
Would the City be able to secure the additional funding and spend that grant amount on that study
prior to the deadline of June 30, 2019? Any grant awarded must be spent prior to the end of the
State Fiscal Year. Keep in mind the money must be spent, the study does not need to be
completed.
This information is needed prior to the October 3rd council meeting in order for the Council to vote on the grant.
Construction Projects (DelDOT)
I have no revised updates from the last meeting but would like to add the following: The open end contract has
completed construction for repaving the shared-use path along north side of Forrest Avenue from Kenton Road
to Saulsbury Road; along the west side of Saulsbury/McKee Road from Forrest Avenue to College Road; and
along the south side of Hazlettville Road from P.O.W./MIA Parkway to Schutte Park. Also the 640’ section of
5’ wide sidewalk along the east side of Saulsbury Road beginning at Royal Farms has been widened to 10’ to
match the sidewalk to the north and south.
If any subcommittee member is interested, the ribbon cutting ceremony for the Brecknock Park shared-use path
from the park entrance to P.O.W./MIA Parkway is scheduled for Wednesday October 3rd at 3:00 p.m.
Dover PAL – Bicycle Program Update
Officer Smith and I discussed this morning and he is going to use the DelDOT bikes to determine how many
students know how to ride a bike. He is going to borrow the bikes for October 3rd, 4th and the 18th. He will be
able to get an idea how many students can ride and to see if this is a viable program to continue.
Since I will not be able to attend… who is the new Chair?
Thanks,
1
Page 5
DRAFT
City of Dover
Americans with Disabilities Act Transition Plan:
Pedestrian Facilities in the Public Right-of-Way
Public Works Department
Effective Date: TBD
Page 6
DRAFT
City of Dover Public Works Department www.dover.de.us
Table of Contents
Introduction 3
Legal Requirements 3
I. Obstacles to the Public Right-of-Way 4
A. Barrier Removal Priorities 4
1. Location Priority 4
2. Accessibility Condition 4
3. Priority Rank 5
B. Public Complaint Process 5
C. New Construction and Alterations 5
II. Schedule 6
III. Responsible Individual 6
IV. Public Input 7
V. Attachments 7
2 ADA Transition Plan Effective Date: TBD
Page 7
DRAFT
City of Dover Public Works Department www.dover.de.us
Introduction
The purpose of this plan is to ensure that the City of Dover creates reasonable, accessible
paths of travel in the City owned and State owned right-of-ways for everyone, including
people with disabilities. The City of Dover has made a significant and long-term commitment
to improving the accessibility of their pedestrian facilities. The purpose of the Transition Plan
is to identify physical barriers and prioritize improvements that should be made throughout
the City of Dover. This Transition Plan describes the existing policies and programs to
enhance the overall pedestrian accessibility.
Legal Requirements
The federal legislation known as the American with Disabilities Act (ADA), enacted on July 26,
1990, provides comprehensive civil rights protections to persons with disabilities in the areas
of employment, state and local government services, and access to public accommodations,
transportation, and telecommunications.
Title II specifically applies to "public entities" (state and local governments) and the programs,
services, and activities they deliver. Title II Article 8, requires public entities to take several
steps designed to achieve compliance. The plan shall, at a minimum include:
1. A list of the physical barriers in a public entity's facilities that limit the accessibility
of its programs, activities, or services to individuals with disabilities.
2. A detailed outline of the methods to be utilized to remove these barriers and make
the facilities accessible.
3. The schedule for taking the necessary steps to achieve compliance with Title II.
4. The name of the official responsible for the plan's implementation.
Transition plans provide a method for a public entity to schedule and implement ADA
required improvements to existing streets and sidewalks. Following the acceptance of the
Transition Plan, an ADA Policy Statement will be distributed to the public, as depicted in
Attachment D.
3 ADA Transition Plan Effective Date: TBD
Page 8
DRAFT
City of Dover Public Works Department www.dover.de.us
I. Obstacles to the Public Right-of-Way
The City of Dover will identify and assess obstacles in the public right-of-way through the use
of our Graphical Information System software by June 30, 2018. This will be updated on a
regular basis.
In order to remove these identified barriers to accessibility, the City of Dover utilizes many
different approaches in removing barriers in the public right-of-way, including proactively
identifying and eliminating the barrier, responding to public complaints, and ensuring the
appropriate design and build-out of new construction following the most recent design
guidelines.
A. Barrier Removal Priorities
The City of Dover bases barrier removal priorities on two factors: location and the
accessibility condition of the intersection.
1. Location Priority
The City of Dover has identified its location priority as follows:
1. Intersections serving government buildings, schools, medical facilities and
parks.
2. Intersections serving commercial buildings, employment centers and the
Downtown Development District.
3. Intersections serving other areas.
2. Accessibility Condition
Using the data collected from the Graphical Information System software, an
accessibility condition barrier is to be determined as follows:
1. No ramp where one is needed.
2. Sidewalk width less than 36”.
3. No truncated domes.
4. Poor slope = cross slope >3%, running slope > 8.33% (1” on 12”).
5. Sidewalk connectivity not present.
4 ADA Transition Plan Effective Date: TBD
Page 9
DRAFT
City of Dover Public Works Department www.dover.de.us
3. Priority Rank
In order to determine the overall priority of an intersection, the following
matrix will be used.
Location Priority
1 2 3
Locations serving Locations serving
Access Locations serving
Government Commercial &
Condition Other Areas
Facilities * Employment Centers**
Red 1 2 3
Yellow 1 2 3
Green 1 2 3
Government Buildings, Schools, Medical Facilities, Parks.
** Commercial Buildings, Employment Centers, Downtown Development District.
The priority of improvements is based on identifying which of the intersections are in a
high, medium, or low priority locations and the amount of accessibility conditions found
that need to be removed. The accessibility condition barriers will be designated as follows:
Red - Two or more barriers
Yellow - One barrier
Green - Compliant
B. Public Complaint Process
The public complaint process is an integral part of the Transition Plan. Public complaints,
or requests, may often drive the prioritization of improvements. To file a complaint, or a
request regarding accessibility of a sidewalk, or curb ramp, contact the ADA Coordinator in
writing and describe the issue in detail, including the location. The ADA Coordinator will
route this information to the appropriate City of Dover Department of Public Works
Division for inspection and possible action. That Division will then respond to the ADA
Coordinator with its findings and the ADA Coordinator will record the formal response and
reply to the complainant/requestor with the action that will occur. All complaints, or
requests will be kept on file and will include the response. The complaints procedure is
referenced in Attachment D, the ADA Policy Statement.
C. New Construction and Alterations
In order to ensure the correct design of curb ramps, sidewalks, and crosswalks in
new construction and alterations, the City of Dover follows the latest version o f DelDOT
5 ADA Transition Plan Effective Date: TBD
Page 10
DRAFT
City of Dover Public Works Department www.dover.de.us
design specifications. Whenever there is an intersection improvement project, new
construction project, or repaving project, any affected curb ramps, sidewalks, and
crosswalks will be rebuilt to these ADA design guidelines, where feasible and reasonable.
II. Schedule
As opportunity allows, the City of Dover will make efforts to improve the ADA Accessibility of
pedestrian facilities in the public right-of-way. At this time, the City of Dover has a capital
improvement program in place whereby each road that is improved will include the repair of
any ADA deficiencies. Note that this repair schedule is flexible, as changes may occur due to
additional funding availability, improvements due utility companies, etc. There will be times
when it is technically infeasible to provide compliance, such cases include, but are not limited
to, when there is not enough flat area available for handicap movements at the top of the
ramp because it is obstructed by a building, or the slope of a hill is so steep that it would
prevent an adjacent sidewalk to be constructed to ADA compliance. In matters such as these,
the city will reach out to the DelDOT ADA Coordinator for a variance.
Additionally, given a sidewalk inventory as broad and comprehensive as the City’s pedestrian
network, the City will follow the concept of Program Access under Title II of the ADA.
Essentially, this concept allows the City the ability to not install a sidewalk at a specific
location as long as a reasonable path of travel is available.
III. Responsible Individual
The Department of Public Works will manage this Transition Plan. The ADA Coordinator
responsible for the implementation of the City of Dover’s ADA Transition Plan for the
pedestrian facilities in the public right-of-way is:
Paul Thompson
Construction Manager
Phone: (302)-736-7029
Fax: (302)-736-4217
Email: pthompson@dover.de.us
6 ADA Transition Plan Effective Date: TBD
Page 11
DRAFT
City of Dover Public Works Department www.dover.de.us
IV. Public Input
The City of Dover provided opportunities for individuals to comment on this Transition Plan,
which included:
Document copies available and notices sent to the Dover Public Library.
Document made available on the City's website and in the City Clerk’s Office.
The City of Dover published legal notices in the local newspaper, The Dover Post, starting on
TBD. The advertisement provided instructions regarding the timetable for comments and
where to send them (see Attachment B). Public comments were accepted for a period of no
less than thirty (30) days, and will be accepted throughout the life of this Transition Plan. The
public comment form is available on Attachment C. Formal adoption of the Transition Plan
took place on TBD.
7 ADA Transition Plan Effective Date: TBD
Page 12
DRAFT
City of Dover Public Works Department www.dover.de.us
V. Attachments
A. Current List of Barriers for Removal in Priority Schedule Order
B. Advertisement for Public Feedback
C. Public Comment and Response Form
D. ADA Policy Statement
8 ADA Transition Plan Effective Date: TBD
Page 13
DRAFT
Attachment A – Current List of Barriers for Removal in Priority Schedule Order
Page 14
Attachment B – Advertisement for Public Feedback
DRAFT
SOLICITING PUBLIC FEEDBACK – ADA TRANSITION PLAN
CITY OF DOVER
Please take notice that the City of Dover is in the process of compiling an ADA (American with
Disabilities Act) Transition Plan. The City of Dover invites the public to become involved in this
process through written comments. The Public Comment and Response Form is available on the City
of Dover’s website; www.cityofdover.com. The City Manager has appointed Paul Thompson,
Construction Manager, as ADA Coordinator of the City of Dover ADA Transition Plan for pedestrian
facilities in the public right-of-way. He can be reached at 302-736-7029, by fax at 302-736-4217,
email: pthompson@dover.de.us, or by filing the Public Comment and Response Form, which will be
provided at the Department of Public Works, 15 Loockerman Plaza, Dover, DE, 19901.
Date: TBD
Page 15
DRAFT
Attachment C – Public Comment and Response Form
CITY OF DOVER DEPARTMENT OF PUBLIC WORKS
PO Box 475
Phone: 302-736-7025
Dover, DE 19903
Fax: 302-736-4217
Date of Comment: _____________________________________________________________________
Location of Complaint:__________________________________________________________________
Name of Person: _______________________________________________________________________
Address:______________________________________________________________________________
Phone Number:________________________________________________________________________
Email Address:_________________________________________________________________________
Comment: ____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Response: ____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Page 16
Attachment D – ADA Policy Statement
DRAFT
CITY OF DOVER
15 Loockerman Plaza
Dover, Delaware 19901
Americans with Disabilities Act Transition Plan (ADA): Pedestrian Facilities in the Public Right-of Way
Introduction:
The purpose of this plan is to ensure that the City of Dover creates reasonable, accessible paths of
travel in the public right-of-way for everyone, including people with disabilities. The City of Dover has
made a significant and long-term commitment to improving the accessibility of their pedestrian
facilities. The Transition Plan will identify physical barriers and prioritize improvements that should
be made throughout the City of Dover. This Transition Plan will describe the existing policies and
programs to enhance the overall pedestrian accessibility.
Legal Requirements:
The federal legislation known as the American with Disabilities Act (ADA) enacted on July 26, 1990
provides comprehensive civil rights protections to persons with disabilities in areas of employment,
state and local government services, and access to public accommodations, transportation and
telecommunications.
Title II specifically applies to "public entities" (state and local governments) and the programs,
services and activities they deliver. Title II Article 8, requires public entities to take several steps
designed to achieve compliance. The City plan will, at a minimum include:
1. A list of the physical barriers in a public entity’s facilities that limit the accessibility of its
programs, activities, or services to individuals with disabilities.
2. A detailed outline of the methods to be utilized to remove these barriers and make the
facilities accessible.
3. The schedule for taking the necessary steps to achieve compliance with Title II.
4. The name of the official responsible for the plan’s implementation.
The City is in the process of identifying and assessing obstacles in the public right of way through the
use of Geographic Information Systems software. Barrier Removal Priorities based on location
priority and accessibility conditions will be a part of the inventory process. It is very important that
the public be aware that their involvement in this plan is a valuable component to the City in
compiling a workable plan of compliance. Your involvement is solicited in developing the ADA
Transition Plan.
Page 17
Public Complaint
DRAFT
Public complaint, suggestions and comments can also be an integral part of the Transition Plan. Public
comments may often drive the prioritization of improvements. The Public Comment and Response
Form, which is available at the Department of Public Works, 15 Loockerman Plaza, Dover, DE 19901
and at our website; www.cityofdover.com should be completed. The form should be delivered to the
ADA Coordinator, Paul Thompson, Construction Manager for the City of Dover, at City of Dover, 15
Loockerman Plaza, Dover, DE 19901, or via email pthompson@dover.de.us.
Public Input:
Public Comment and Response Forms are available on the City of Dover website,
www.cityofdover.com. The City of Dover welcomes your participation and unique outlook as to how
the City can meet and exceed ADA requirements and recommendations. Public involvement in the
City’s ADA plan has been a valuable component to the City in compiling a workable plan of
compliance. We continue to solicit your additions to the ADA Transition Plan.
An inventory of the City of Dover intersections will be included with this Transition Plan, upon
completion.
The plan to complete the ADA requirements is through the annual Department of Public Works
operational budget and the capital improvement plan budget and will bring the pedestrian network
into compliance.
As stated above, the City will annually include ADA compliance with our paving projects.
Donna Mitchell, Acting City Manager
Dover City Council
TBD
Page 18
DRAFT
Attachment C – Public Comment and Response Form
CITY OF DOVER DEPARTMENT OF PUBLIC WORKS
PO Box 475
Phone: 302-736-7025
Dover, DE 19903
Fax: 302-736-4217
Date of Comment: _____________________________________________________________________
Location of Complaint:__________________________________________________________________
Name of Person: _______________________________________________________________________
Address:______________________________________________________________________________
Phone Number:________________________________________________________________________
Email Address:_________________________________________________________________________
Comment: ____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Response: ____________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Page 19
Dover Police P.A.L.
DRAFT
To Bicycle and Pedestrian Subcommittee:
Re: Capital after school “Pilot” bike program
Date: September 19, 2018
Hello,
On September 18, 2018, I met with members of Capital School District in reference to our “Pilot Bike
Program.” The details of the purposed program were greatly accepted and we are now moving to the next
step of setting the foundation for the program.
When I need assistance with the program, I will contact the subcommittee with details and program needs.
Sincerely,
Patrolman First Class Anthony Smith
Dover P.A.L. Coordinator
Employer Identification Number: 81‐5218410
400 SOUTH QUEEN STREET, DOVER, DELAWARE 19904
T: 302-242-2091
ANTHONY.SMITH@CJ.STATE.DE.US WWW.DOVERPOLICE.ORG/PAL