Page 1
REGULAR COUNCIL MEETING
AGENDA
February 22, 2010 - 7:30 P.M. - Council Chambers - City Hall - City of Dover
OPEN FORUM - 15 MINUTES PRIOR TO OFFICIAL MEETING (7:15 P.M.)
INVOCATION BY CHAPLAIN WALLACE DIXON
PLEDGE OF ALLEGIANCE
AGENDA ADDITIONS/DELETIONS
* CONSENT AGENDA
Those items on the Council Agenda which are considered routine and non-controversial shall be marked
with an asterisk (*) and will be acted upon by a single roll call vote of the Council. There will be no
separate discussion of these items unless a member of Council so requests, in which event the matter shall
be removed from the Consent Agenda and considered a separate item.
* 1. Adoption of Minutes - Regular Council Meeting of January 25, 2010
2. Presentations
A. Certificate of Appreciation - Snow Storm Workers
B. Recognition of Service - Brian E. Lewis - Dover Human Relations Commission -
October 13, 2008 through February 1, 2010
C. Contribution to the Capital Campaign of the Dover Public Library Building Fund - Becker
Morgan Group
3. Proclamation - Black History Month
4. Proposed Resolutions
A. Apology for Slavery in Delaware (Dover Human Relations Commission)
B. Resolution #2009-21 Authorizing the Issuance and Sale of up to $2,404,017 Water and
Sewer Revenue Bonds (Delaware Drinking Water State Revolving Loan Fund)
5. Rescheduling of Public Hearing/Final Reading - Rezoning
Property located at 1051 College Road, owned by Lands of JNK, LLC, consisting of 4.32+/-
acres, less a street right-of-way area consisting of 0.55+/- acres that divides the original tract into
two pieces. These properties are currently zoned R-8 (One-family Residence) and the proposed
zoning is RG-2 (General Residence) The First Reading of proposed Ordinance #2009-29 was
accomplished during the Council Meeting of November 23, 2009. This item was tabled by the
Planning Commission until March 15, 2010. It is recommended that the Public Hearing/Final
Reading be rescheduled for April 12, 2010.
Page 2
Council Agenda
February 22, 2010 Page 2
6. Utility Committee Report - January 25, 2010
A. White Oak Solar Project
* a-1. Energy Land Lease
(Committee Recommended Authorizing the City Manager to Execute the Ground
Lease Agreement with White Oak Solar Energy, LLC, as per the Terms Outlined in
the Lease)
* a-2. Energy Interconnection Agreement
(Committee Recommended Authorizing the City Manager to Execute the Small
Generator Interconnection Agreement with White Oak Solar Energy, LLC, as per the
Terms Outlined in the Agreement)
* a-3. Energy Transmission Tariff
(Committee Recommended Adoption of the Tariff Titled 69 KV Delivery Service
Classification to the Grid for White Oak Solar Energy, LLC, and to Recognize this
as a Standard City of Dover Electric Tariff)
* B. PACE/NAES Monthly Report (November)
(Committee Recommended Acceptance of the Report)
7. Legislative, Finance, and Administration Committee Report - January 25, 2010
* A. Review and Recommendations - Filling Critical Positions
a-1. Fire Chief’s Assistant
(Committee Recommended Approval of Hiring Request)
a-2. Assistant to the Community Development Manager (Temporary/Part-time
Employee CDBG - Grant Funded)
(Committee Recommended Approval of the Request to Recruit for a Temporary, Part-
Time Employee to Assist with the Housing Rehabilitation Program and the
Neighborhood Stabilization Program, in an Amount Not to Exceed $10,000)
B. Review of Extension - Title V Criminal Justice Council Grant - Girls Circle
(Committee Recommended Approval of the Submission of a Formal Application for the
Third Year of Funding for the Title V Grant Through the Criminal Justice Council)
* C. Proposed Ordinance #2010-05 - Chapter 2 - Administration, Article VI - Other
Post-Employment Benefits Fund, Section 2-505 - Medicare Part B Premium
Reimbursements (See Item #11-A)
(Committee Recommended Adoption of Ordinance #2010-05)
* D. Discussion - Requirement that Council, Committee, Commission, and Board
Members Step Down When Running for Other Office
(Committee Tabled this Item for Further Discussion)
* E. Final Report - Revenue/Cost Saving Ideas Submitted for Consideration
(Committee Deferred Due to Time Constraints)
Page 3
Council Agenda
February 22, 2010 Page 3
* 8. Safety Advisory and Transportation Committee Report - January 27, 2010
A. Request for Amendment to Chapter 18 - Animals, Section 18-16 - Keeping Bees
(Committee Action Not Required)
B. Central Delaware Chamber of Commerce Transportation Recommendations
(Committee Recommended That the City Encourage the Chamber of Commerce to
Continue with this Process and Look Forward to the Final Recommendations)
C. Waiver Request to Allow for the Creation of a Lot Without Public Street Frontage
- Garrison Oak Technical Park
(Committee Recommended Approval of the Request for Waiver from the Street Frontage
Requirements for the Garrison Oak Solar Park Lot 15, as Recommended by the Planning
Commission)
D. Discussion - Alcohol Related Issues
(Committee Recommended That Staff Be Authorized to Begin the Process of Drafting
Ordinances to Address the Concerns of the Community)
E. Briefing on Delaware Department of Transportation (DelDOT) Projects
(Committee Action Not Required)
F. Briefing on City of Dover Projects
(Committee Action Not Required)
G. Briefing on Dover/Kent County Metropolitan Planning Organization (MPO) Projects
(Committee Action Not Required)
* 9. Monthly Reports - December 2009
A. Budget Report
B. Chief of Police Report
C. City Assessor Report
D. City Manager’s Report
E. City Planner’s Report
F. Dover Fire Department Report
G. CIP Report
* 10. Annual Report - Dover Human Relations Commission
11. Evaluation of Bids
A. Substation Potential Transformers (PT) and Current Transformers (CT) Purchase
B. Construction Documents - Dover Public Anchor Library
12. Retail Voluntary Customer Demand Response Tariff
13. Letter in Opposition to House Bill #194 - Addition of New Gambling Venues in Delaware
14. Selection of Polling Places for 2010 Regular Municipal Election
Page 4
Council Agenda
February 22, 2010 Page 4
* 15. Appointments
A. Ad-Hoc Health Benefits Committee
a-1. Thomas J. Leary, Council Member
a-2. Beverly C. Williams, Council Member
a-3. Anthony J. DePrima, City Manager (Ex Officio)
a-4. Kimberly D. Hawkins, Human Resources Director
a-5. Donna S. Mitchell, Controller/Treasurer
a-6. David Spicer, FOP Representative
a-7. Paul M. Simon, IBEW Representative
a-8. Kenneth Clendaniel, IUE/CWA Representative
a-9. Stephen A. Enss, Non-Bargaining Representative
B. OPEB Trust Fund Board
b-1. Kenneth L. Hogan, Council Member
b-2. James G. McGiffin, Jr., Council Member
b-3. Anthony J. DePrima, City Manager
b-4. Donna Mitchell, Controller/Treasurer
b-5. Kimberly D. Hawkins, Human Resources Director
16. Rezoning Request/First Reading (Recommended for referral to the Planning Commission on
March 15, 2010 and that a Public Hearing be set for April 12, 2010 at 7:30 p.m.)
A. Property located on the south side of White Oak Road, 1,340+/- feet west of Long Point
Road, owned by TLFD Management, LLC. The property, consisting of 12.73+/- acres,
is currently zoned R-20 (One Family Residence) subject to SWPOZ (Source Water
Protection Overlay Zone) and the proposed zoning is R-8 (One Family Residence)
subject to SWPOZ (Source Water Protection Overlay Zone)
17. First Reading - Proposed Ordinance #2010-05 with Proposed Amendment No. 1
The First Reading is offered on the following proposed ordinance. Final action by Council
will take place during the Second Reading of the ordinance on March 8, 2010. Copies of
all proposed ordinances are available at the entrance of the Council Chambers or can be
obtained from the City Clerk's Office.
A. CHAPTER 2 - ADMINISTRATION , ARTICLE VI - OTHER POST -EMPLOYMENT BENEFITS
FUND , SECTION 2-505 - MEDICARE PART B PREMIUM REIMBURSEMENTS
(Legislative, Finance, and Administration Committee)
18. Final Reading - Proposed Ordinance #2010-03
The First Reading of the Proposed Ordinance was accomplished during the Council
Meeting of January 25, 2010. Copies of the proposed ordinance are available at the
entrance of the Council Chambers.
A. FY 2009 BUDGET BALANCES AND PROJECTED CARRY FORWARD BALANCES
19. Council Members Announcements
/tm
S:\ClerksOffice\PACKETS\2010\Council\02-22-2010\02-22-2010.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 5
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on January 25, 2010 at 7:30 p.m. with Council President
Williams presiding. Council members present were Mr. Leary, Mrs. Russell, Mr. McGlumphy,
Mr. Slavin, Mr. McGiffin, Mr. Hogan, Mr. Salters, and Mr. Ruane.
Council staff members present were Police Chief Horvath, Ms. Russell, Mrs. Mitchell,
Mrs. Townshend, Fire Chief Christiansen, Mr. DePrima, City Solicitor Rodriguez, Mrs. McDowell,
and Mayor Carey.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Williams declared the Open Forum in session and reminded those present that
Council is not in official session and cannot take formal action.
There was no one present wishing to speak during the Open Forum.
The invocation was given by Chaplain Dixon, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. McGiffin moved for approval of the agenda as presented, seconded by Mr. Leary and
unanimously carried.
Mr. McGlumphy moved for approval of the consent agenda, seconded by Mr. McGiffin and
carried by a unanimous roll call vote.
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF JANUARY 11, 2010
The Minutes of the Regular Council Meeting of January 11, 2010 were unanimously approved
by motion of Mr. McGlumphy, seconded by Mr. McGiffin and bore the written approval of
Mayor Carey.
C ER T I F I C A T E O F A P PR E C I A T I O N A N D C O N G R A T U L AT I ON S -
CHARLES WASHINGTON, JR.
The following Certificate of Appreciation and Congratulations was read into the record by Mayor
Carey:
CERTIFICATE OF APPRECIATION AND CONGRATULATIONS
Be It Hereby Known To All That
The Mayor and Council Commend
CHARLES WASHINGTON, JR.
for dedicated service to the City of Dover
March 1992 - January 2010
17 Years of Service
The Mayor and Council Extend Sincere
Appreciation and Congratulations
Page 6
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 2
Mayor Carey presented the Certificate to Mr. Washington and relayed appreciation for the dedicated
service he provided during his employment to the City of Dover and the residents.
Ms. Sharon Duca, Water/Wastewater Manager, explained how critical it is to maintain the City’s
infrastructure and that part of the maintenance is to provide protection of the infrastructure. She
stated that Mr. Washington has played an important role in protecting the City’s infrastructure and
thanked him for the services provided.
Mr. Washington thanked God, his family, and the City of Dover for giving him the opportunity to
serve and for the experience.
PRESENTATION - HOLZMAN MOSS - DESIGN DEVELOPMENT REPORT - DOVER
ANCHOR LIBRARY
Mr. Doug Moss of Holzman Moss introduced those that are integral to the design development for
the Dover Anchor Library, as follows: Mr. Gregg Moore, Becker Morgan Group (Landscape
Architecture, Civil Engineering, and local liaison); Mr. Jerry Dougherty, EDIS (Project Manager);
and Mr. Brian DiSabitino, Principle with EDIS.
Mr. Moss and Mr. Dougherty reviewed a Presentation entitled “Dover ‘Anchor’ Public Library”
(Exhibit #1).
Ms. Marjory Cyr, Library Director, referred to the “Fundraising” phase of this project and advised
members that the State of Delaware will match eligible construction costs for new libraries at 50%;
therefore, it is anticipated that the State will contribute $10.6M to this project. She stated that the
City has already received a commitment from the State in the amount of $5.1M and that the City has
submitted an additional request for $5M for the remainder of the State’s contribution. She expressed
the importance of moving forward with the project and for the City to show that the funds that have
been committed are spent and ensure the State that the remaining $5M funds requested will be spent.
Ms. Dorothy Snyder, President of the Dover Public Library Advisory Commission, advised members
that, approximately 20 years ago, the City Council authorized the creation of the Dover Public
Library Advisory Commission and she introduced some of its original members: Mr. John Hindman,
Mrs. Goldie Legates, Mr. Lee Carey, and Dr. Ed Goate (unable to attend) and current members:
Mr. David Lewis and Ms. Lois Dunning.
Ms. Cyr requested all other Library supporters in attendance at the meeting to stand (it is noted that
several in attendance stood).
Ms. Donna Stone, Chair of the Capital Campaign for the Dover Anchor Library, expressed her
enthusiasm for this project since its inception. It is her belief that the new library will enhance the
quality of life for the City and the community. Referring to a quote by Lady Bird Johnson, “there
is perhaps no more democratic place in any community than the public library. The only entrance
requirement is interest”, Ms. Stone advised members that over 1,100 people per day exhibit their
interest in entering the Dover Public Library and that this number will continue to grow. With the
Page 7
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 3
vision and leadership of City Council and the citizens of Dover, she felt assured that the new library
would become a reality for our community.
Ms. Anne Norman, State Librarian, addressed members on behalf of First Lady Carla Markell and
Secretary of State Jeff Bullock to convey their continued support for the Dover Public Library and
express appreciation for the City of Dover’s leadership in providing quality, professional, library
services from the Capital of the State for more than 100 years. She stated that the State has
acknowledged this leadership in recent years by designating the Dover Public Library as an anchor
library. The State contributes additional funds each year to support the Dover Public Library in
providing services to residents throughout the County. Ms. Norman indicated that the Dover Public
“Anchor” Library project has been the number one priority of the Delaware Division of Libraries and
also the Council on Libraries since the release of the 2005 Master Plan for Libraries, actually this
entire decade. Throughout this decade, the severe space challenges have significantly limited the
services that can be provided. Many more services could be provided in a new larger facility that
is not only environmentally friendly but designed for the evolution of library technologies. She
noted that the City and State are having to make very difficult decisions in the tough economic times,
and are limiting expenses to essentials and those that will deliver a return on investment. For those
projects that are ready for construction, the State is recommending several million of the very scarce
capital dollars to meet the State’s construction obligations; therefore, she explained that the State’s
commitment is contingent on the City’s endorsement for moving forward with this project.
Ms. Norman explained that libraries are the reflection of the aspirations of a community and, as the
capital City, the Dover Public Library reflects the aspirations of the State. She requested that all
continue with the courage and conviction that this investment in the library will enable the residents
of Dover, Kent County, and Delaware to achieve their highest potential.
Ms. Cyr announced that today was the “kick off” day for the Capital Campaign, which is a very
ambitious campaign, and she felt confident that it will be successful. Before the campaign actually
began, she advised members that $90,024 in pledges and gifts have been received.
Mr. Ruane relayed appreciation for the presentation and thanked everyone for their enthusiasm in
regards to this project, feeling that it has reinforced the dedication shown by the community during
the past 20 years. He thanked everyone for their continued efforts and noted that he supports the
project moving forward.
Mr. Slavin also thanked everyone who has participated in this project. With regards to the value of
the project, he noted that this project would improve economic development, downtown
revitalization, etc. and that it is projected to carry no debt. Of all the projects presented to the City,
it was his opinion that this project has been one of the most creative projects as it relates to finance
and design. Considering that this is a $20M project and the City’s contribution is $3.7M, Mr. Slavin
calculated that for every dollar put aside for this project, staff has leveraged an additional $5. Should
members be interested in the effect such a project has had on other communities, he suggested that
they visit Newark and Milford to observe what the funding has done for their libraries and what their
libraries have done for their communities. He concurred with a previous statement made by
Mr. Moss regarding the magnitude of change that will come to this community. Mr. Slavin relayed
his full support and endorsement and encouraged everyone to move forward with this project.
Page 8
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 4
Mr. Salters stated that there is a cultural aspect involved with the proposed library facility and that
the community could benefit from the additional space.
Council President Williams relayed appreciation for everyone coming forward to show their support
for this project.
Mr. McGiffin indicated his 100% support and enthusiasm for this project.
PRESENTATION - TYLER TECHNOLOGIES - REVALUATION
Mrs. Russell, City Assessor, introduced Mr. Paul Miller of Tyler/CLT, who was hired to conduct a
City-wide property tax revaluation, which began in January 2009. Mr. Miller reviewed a
Presentation of the Revaluation Project (Exhibit #2). Members were also provided a copy of the
Notice of Property Revaluation that will be sent to property owners (Exhibit #3).
In response to Mr. Ruane regarding the “lag” time between the most recent sales data and the
property tax revaluation, Mr. Miller explained that the residential review was conducted in
December and that the reviewer would have utilized sales data from mid-November; however, this
information is constantly being reviewed and updated accordingly. When there is a sale, he stated
that he utilizes the information to compare it with the predicted value on the property. Mr. Miller
advised members that every commercial property was visited and valued.
Responding to Mr. DePrima, Mr. Miller confirmed that, although there has been a trend down for
sales, the current property values have not gone below the 2005 values established in 2005, which
was the base year.
PROPOSED RESOLUTION #2009-22 - APPROVING STREET ABANDONMENT -
PORTION OF GALAXY DRIVE (Tabled on November 23, 2009)
During their Regular Meeting of November 23, 2009, City Council held a public hearing to consider
abandonment of a 600-foot unimproved portion of Galaxy Drive lying between Lot 12 and Lot 22
in the Kent County Aeropark. The matter was tabled at that time at the request of the applicant.
Mr. Salters moved to remove the matter from the table, seconded by Mr. Leary and
unanimously carried.
Mr. DePrima, City Manager, reminded members that the proposed abandonment is for a “paper
street” - a street that was platted but never constructed. The street platted consists of a 600-foot
portion of Galaxy Drive that was originally designed to accommodate the needs of lots 11, 12, 21,
and 22 in the Kent County AeroPark. That portion of the road was never constructed and, in 1994,
lots 11 and 21 were consolidated to land associated with the former Sunroc building. Access to the
building and land was accomplished via Starlifter Boulevard. The AeroPark Authority, on behalf
of Kent County, would like to consolidate lots 12 and 22 in order to add value to the park and
improve their ability to sell the lots. Abandonment of the 600-foot portion of Galaxy Drive would
allow for the lots to be larger.
Page 9
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 5
Mr. DePrima reminded members that the street abandonment was considered by the Utility
Committee during their meeting of October 26, 2009 and it was determined that the abandonment
would not impact the service of utilities to the remaining lots in the Aeropark. The Planning
Commission and Utility Committee recommended approval of the requested abandonment,
stipulating that utility easements be reserved for the City.
Mr. DePrima noted that, during the public hearing held by Council, members were requested to table
the matter to provide the Aeropark Authority the opportunity to work out issues with a neighboring
property owner who had objected to the abandonment. Although it was his understanding that the
issues have been resolved and an agreement has been made for alternative access to lots 12 and 22
that do not involve public right-of-way, he suggested that members re-open the public hearing. He
assured members that the objecting party was made aware of the meeting being held this evening.
Mr. McGiffin moved to reopen the public hearing, seconded by Mr. Hogan and unanimously
carried.
Council President Williams declared the public hearing open. There being no one present wishing
to speak, Council President Williams declared the public hearing closed.
Responding to Mr. Ruane, Mr. DePrima stated that, with the exception of emails he has received,
there is no other documentation to indicate that the issues have been resolved. It was his hope that
the objecting party would be in attendance and would provide public testimony regarding this matter.
Mr. Hogan moved for approval of the request to abandon a 600-foot unimproved portion of Galaxy
Drive lying between Lot 12 and Lot 22 in the Kent County Aeropark, seconded by Mr. Salters.
Mr. Ruane relayed concern with taking such action, explaining that the public hearing was re-opened
to allow for some representation to assure members that the issues have been resolved.
Mr. McGlumphy noted that since this matter has been before City Council since November 23, 2009,
if the parties involved were not in agreement, they would have been present to speak in opposition
to the request. It was his feeling that their absence is an indication that Council should move forward
with the matter.
The motion to approve the request to abandon a 600-foot unimproved portion of Galaxy Drive
lying between Lot 12 and Lot 22 in the Kent County Aeropark was carried by a roll call vote
of eight (8) yes, and one (1) no (Mr. Ruane) and Council Resolution No. 2009-22 was adopted,
as follows:
A RESOLUTION VACATING AND ABANDONING A PORTION OF A CERTAIN STREET
SITUATED IN THE CITY OF DOVER.
BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
Page 10
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 6
Section 1. The Council of the City of Dover hereby vacates and abandons the following street:
All that certain parcel of land situated in the City of Dover, East Dover Hundred,
Kent County, Delaware and being a portion of Galaxy Drive, being a 60-foot wide
right-of-way of the Kent County Industrial Park by Whitman, Requardt and
Associates, Engineers, dated September 1987 and filed in the Kent County Recorder
of Deeds Office as Plot Book 21, page 16 and being more particularly described as
follows:
Beginning at a point on the westerly right-of-way of Galaxy Drive, a 60-foot wide
right-of-way, said point being the northeasterly corner of Lot 12 of said Industrial
Park now or formerly belonging to Kent County and filed for record at the Kent
County Recorder of Deeds Office in Deed Book O 29, page 282 and the lands herein
described.
Thence easterly across the right-of-way of said Galaxy Drive the following course
and distance; South 83° 31’ 43” East 60.01 feet to a point.
Thence binding on the easterly right-of-way of Galaxy Drive along Lot 22 of said
Industrial Park now or formerly belonging to Kent County and filed for record at the
Kent County Recorder of Deeds Office in Deed Book O 29, page 282 the following
course and distance; by and with a curve to the left having a radius of 470.00 feet, an
arc length of 592.47 feet and subtended by the chord bearing South 29° 38’ 30” East
554.02 feet to a point on curvature.
Thence southerly across the right-of-way of said Galaxy Drive the following course
and distance; South 17° 10’ 49” West 60.41 feet to a point.
Thence binding on the westerly right-of-way of Galaxy Drive along aforesaid Lot 12
of said Industrial Park the following course and distance; by and with a curve to the
right having a radius of 530.00 feet, an arc length of 675.55 feet and subtended by the
chord bearing North 30° 02’ 37” West 630.74 feet to the point of beginning.
Containing 0.873acres of land, more or less.
Section 2. Since no person has been deprived of property by the vacating and abandoning of the
aforesaid street, no compensation is awarded.
Section 3. All costs of conveyance shall be borne by the property owners.
Section 4. This resolution shall be effective upon the filing of a revised plot plan of the aforesaid
street.
ADOPTED: JANUARY 25, 2010
Page 11
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 7
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE REPORT -
JANUARY 11, 2010
The Parks, Recreation, and Community Enhancement Committee met on January 11, 2010 with
Chairwoman Russell presiding.
PRESENTATION - SALVATION ARMY
Due to the absence of a representative from the Salvation Army, no presentation was provided.
UPDATE ON 2009 YOUTH EMPLOYMENT PROGRAM
Mr. William Neaton, Economic Development Director, explained that the Dover Housing Authority
(DHA) is administering the Youth Employment Program and that 33 applications have been
received, 18 from applicants living in DHA developments, five (5) from west Dover, four (4) from
the downtown area, and four (4) from east Dover. He added that 17 applications were received from
residents of Camden but were ineligible for consideration due to non-residency. He noted that
selectees would undergo a one-week training program in general job skills conducted by the DHA
with the assistance of Aid in Dover. He noted that originally ten (10) businesses had expressed
interest in utilizing youths, and that figure has since grown to 29. He stated that 20 young people
will be hired at the minimum wage rate and will work for 16 weeks and that applicants were solicited
by the DHA through flyers, phone calls, and personal contact.
In response to Mr. Hogan, Mr. Neaton explained that selections will be made by the DHA with
assistance from the Downtown Dover Partnership (DDP). He also noted that the DDP wished to
rescind their request to the Committee that the grant be amended to name the DHA as grant
administrator and recipient.
Responding to Mr. Ruane, Mr. Neaton indicated that the City has a Memorandum of Understanding
(MOU) with the DHA to administer the program and train the youths selected, and DDP will review
their efforts. He stated that all Community Development Block Grant (CDBG) funds for the
program are dedicated to wages, and the DHA will bill the City for this cost. He noted that there are
no other administrative fees associated with the program.
In response to Mrs. Horsey, Mrs. Tracey Harvey, Community Development Manager, noted that low-
to-moderate income participants were identified by the use of a sliding scale based on income and
family size.
Mrs. Russell felt that opportunities for low income youth should have been distributed City-wide.
She questioned why a large percentage of participants were selected from the DHA housing
developments since she stated that the program was financed through approximately $42,000 from
CDBG funds and approximately $10,000 from the DHA. She felt that there were a number of
potential candidates for the program in the downtown area.
Page 12
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 8
Mr. Neaton noted that applications were broadly distributed and that the downtown area was
canvassed by word of mouth and flyers.
Mr. Hogan expressed disagreement, stating that unless the program was designed specifically so that
funds were designated for specific neighborhoods, attempts to distribute selection would amount to
artificially imposing a quota. He felt that if applications were made widely available, the most
qualified candidates should be selected.
Concurring with Mrs. Russell, Mr. Ruane stated that it would be important to avoid the perception
that selection for the program is localized to those in assisted housing areas. He felt that if there
were a number of equally qualified applicants on the selection list, effort should be made to
distribute opportunities City-wide. He noted that the response to the program exceeded available
resources and suggested that this program be considered during the next CDBG application period.
Mrs. Russell requested that the applicants from Camden be sent a letter of appreciation for their
interest with an explanation of the reason for non-consideration.
The committee recommended acceptance of the report.
By consent agenda, Mr. McGlumphy moved for approval of the committee’s recommendation,
seconded by Mr. McGiffin and carried by a unanimous roll call vote.
Puncheon Run Watershed Action Team Update
Mr. Scott Koenig, Public Services Manager, stated that he had spoken with Mr. Jared Adkins,
Sediment and Stormwater Program Manager/Engineer, Kent Conservation District, who indicated
that the District is planning to submit a concept plan for a stream modification project to the
Delaware Clean Water Advisory Council. Mr. Koenig believed this would occur in February. If the
project receives a favorable recommendation from the Advisory Council, the District will develop
a more specific scope of work and contact the property owners involved. At that point, Mr. Koenig
stated, the City will act as a local sponsor for the project.
Mr. Koenig suggested that the Committee support a future channel modification project if State
funding is available.
In response to Mr. Ruane, Mr. Koenig explained that the City allocated $5,000 in the current budget
to fund submission of a Letter of Map Revision to potentially alter the flood plain map in the
Puncheon Run area. He explained that a proposal has been received from URS Engineering for the
initial phase of the work at a cost of $8,700 and that Senator Brian Bushweller and Representative
Brad Bennett have indicated they would be willing to fund this phase of the project. However,
Mr. Koenig noted that the proposal from URS Engineering to complete the additional funding for
the Letter of Map Revision exceeds the $5,000 that the City has allocated. He stated that two options
are being considered: 1) to contact URS Engineering to renegotiate their proposal, or 2) to seek
consulting requests from other firms to prepare the Letter of Map Revision.
Page 13
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 9
Mr. Ruane stressed the importance of moving forward expeditiously on this matter, stating that a
hardship is being created for residents in the area who are paying, in some cases, over $1,000
annually for flood insurance because the old map indicates that they are in the flood plain. He noted
that the issue creates additional difficulties for property owners who want to sell or refinance their
homes.
The committee recommended that the City of Dover write a letter in support of the Kent
Conservation District’s request to the Clean Water Council to fund a stream modification project at
Puncheon Run.
By consent agenda, Mr. McGlumphy moved for approval of the committee’s recommendation,
seconded by Mr. McGiffin and carried by a unanimous roll call vote.
Planning and Funding for New Library
Ms. Margery Cyr, Library Director, stated that Holzman-Moss Architects will visit Dover on
January 25, 2010, to make a presentation to City Council regarding the conclusion of the
Design/Development Phase of the project and to discuss budget issues. Holzman-Moss will also
meet with potential major donors for the capital campaign at that time. She noted that Horizon
Philanthropic is working with the Library Committee to manage the campaign, and that the Capital
Campaign Committee is chaired by Mrs. Donna Stone, with First Lady Carla Markell serving as
Honorary Chair. She noted that there are four “points” to the campaign as follows: 1) a Major Donor
Committee, also chaired by Mrs. Stone, 2) a Medical Committee chaired by Mrs. Terri Nellans
Brown with Dr. Ralph Zaragoza as Honorary Chair; 3) a Business Committee chaired by
Mr. K. C. Sheth with Mayor Carey as the Honorary Chair; and 4) an Events Committee co-chaired
by Mrs. Julie Eaby and Ms. Denise Gast. She noted that solicitation training will begin
January 21, 2010, and solicitation will begin immediately thereafter, with the largest potential donors
being approached first. She indicated that part of the large donor solicitation will be for donors to
purchase naming rights to parts of the building or the building itself, and the opportunity to make
multi-year pledges will also be provided.
Ms. Cyr stated that during the week of January 4, 2010, several sizeable donations were received,
including a request to purchase a naming right to the children’s computer area for $12,500, $5,000
from a local business, and $5,000 which was bequeathed by a community member in his will. In
addition, she indicated that a pledge to donate $1,000 per year over a three-year period was received
from one of the committee members and was accompanied by an initial $1,000 payment.
Ms. Cyr stated that the group will meet with There DuPont of the Longwood Foundation in early
February to provide an update on the project and obtain feedback about the most opportune timing
for grant submission. She noted that grant submission deadlines are March 15, 2010, and
September 15, 2010.
Ms. Cyr explained that arrangements are being made to host a breakfast for State and local legislators
in February in preparation for State Bond Bill hearings scheduled in March. She noted that a request
has been submitted to the State for $5 million. Ms. Cyr mentioned that she attended a meeting
during the week of January 4, 2010, where Mr. Rick Geisenberger, Assistant Secretary of State,
Page 14
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 10
indicated that he anticipated that the first two (2) to three (3) projects recommended by the Delaware
Division of Libraries would be funded, and she noted that Dover’s library project is first on that list.
In response to Mr. Ruane, Ms. Cyr stated that there has been a great deal of public support for library
construction throughout the history of the project. She explained that the Steering Committee has
guided the project overall, and that this committee is comprised of the chairs of various supporting
committees formed several years ago. She noted that the composition of this group is reflective of
the library population, as it is composed of both City of Dover and Kent County residents. She
explained that the work of the previous supporting committees has been completed and these
members are now serving on the new Capital Campaign committees, with 7-10 participants actively
working on each subcommittee.
In response to Mr. Hogan, Ms. Cyr estimated that more than 200 people have had an active role in
the project, in addition to those who have attended monthly public meetings. She indicated that over
5,000 individuals have signed petitions in favor of the library, and that the list of supporters
continues to grow. She stated she would try to gather more precise information for the Committee
relating to public support for the project.
CDBG Program
Mrs. Tracey Harvey, Community Development Manager, provided an update on CDBG Projects as
follows:
Fiscal Year 2008
Dover Interfaith Ministry - Mrs. Harvey stated that Dover Interfaith Ministry to the
Homeless has begun submitting bills for renovations for the shelter at 684 Forrest
Avenue, has signed a lease with the Downtown Dover Partnership, and has applied
for a building permit for minor demolition of the some of the interior, which will not
be included in CDBG funding.
Fiscal Year 2009
Homeowner Rehabilitation Program - Mrs. Harvey indicated that three (3) homes
have been completed (49 S. Kirkwood Street, 420 Court Street, 720 Carol Street).
She explained that the waiting list for housing renovations will open on
January 21, 2010, at City Hall. The first 20 qualified applications will be accepted,
and the remaining 2009 funding will be utilized to rehabilitate homes of the first
four (4) to five (5) families on the list.
Homeownership Assistance Program - Mrs. Harvey reported that one (1) family has
purchased a home, closing documents were recently received for two (2) additional
families to close by the end of January and mid-February, and one family will be
closing in mid-March.
Page 15
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 11
Elizabeth W. Murphey School - Mrs. Harvey noted that the State Historic
Preservation Office (SHPO) denied approval for the replacement of existing windows
with vinyl windows at the Murphey School. The Executive Director submitted bids
and a scope of work to replace the steam lines to heat buildings 12-48 instead of the
window replacement project, and this request has been approved by SHPO.
In response to Mr. Ruane, Mrs. Ann Marie Townshend, Director of Planning and Community
Development, indicated that this administrative change was approved by the representative from the
U. S. Department of Housing and Urban Development, as both projects are classified as
rehabilitation programs.
RC & D Emergency Home Repairs - Mrs. Harvey stated that emergency home
repairs have been completed on homes at 38 North Kirkwood Street, 117 Quail
Hollow Drive, 722 Forest Street, and 893 Schoolhouse Lane.
Housing and Recovery Act of 2008 (Neighborhood Stabilization Program) Program
Mrs. Harvey explained that six (6) properties have been purchased under this program and $822,255
has been expended in Neighborhood Stabilization Program (NSP) funding to date. She stated that
one (1) home is under renovation and the next round of renovations is expected to begin in
mid-February or early March.
In response to Mr. Ruane, Mrs. Harvey indicated that, in addition to advertising through legal
notices, the program has been publicly promoted on residential electric bills beginning in
December 2009, which has resulted in approximately 10-15 calls per day from interested parties.
She also stated that the program was mentioned at the second public hearing for the preparation of
the 2010 CSBG Consolidated Plan, which was held on January 7, 2010.
In response to Mr. Ruane, Mrs. Harvey stated that approximately $1.5 million was received in NSP
funding and approximately $823,000 has been spent. She noted that ten (10) houses were originally
scheduled for purchase, but she believed that eight (8) total properties will be purchased and the
remaining funds will be used for renovations. She believed that this program was a one-time
opportunity from the federal government.
Mrs. Harvey stated that the Request for Proposals (RFP) to solicit applications under the FY 2010
CDBG will be issued on January 14, 2010.
Responding to Mr. Ruane, Mrs. Harvey stated that FY 2010 funding levels for the CDBG Program
were anticipated to be similar to FY 2009, but possibly decreased in the category of program income
because repayments from home sales/refinancing have not been coming in. Mrs. Harvey stated she
would provide information regarding the FY 2010 program at the next Committee meeting.
Youth Advisory Committee
Mrs. Russell stated that the Youth Advisory Committee remains active and that members are
planning for upcoming Committee elections.
Page 16
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 12
By consent agenda, Mr. McGlumphy moved for acceptance of the Parks, Recreation, and
Community Enhancement Committee Report, seconded by Mr. McGiffin and carried by a
unanimous roll call.
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
JANUARY 11, 2010
The Legislative, Finance, and Administration Committee met on January 11, 2010 with Chairman
McGlumphy presiding.
Review and Analysis
Vacant Positions Report
Mr. Anthony DePrima, City Manager, advised members that the vacant positions report is one (1)
of three (3) similar reports that he monitors each month. He explained that these reports were
created to measure the pulse in this difficult economic time and the report will change as positions
are filled.
Responding to Mr. McGlumphy, Mr. DePrima stated that the City is in the second year of a hiring
freeze and, as with last year, there will be some positions that will be eliminated from the budget
permanently.
Overtime Report
Mr. DePrima advised members this report is used to monitor overtime usage by department. He
noted that the report was created to insure that employees are not making up lost income from
furloughs with overtime and, to date, any overtime has been justified.
In response to Mr. Ruane, Mr. DePrima stated that the increase in overtime in the Transmission and
Distribution section of the Electric Department is from evening and weekend preparation for the
Governor’s Avenue Project.
Responding to Mr. McGlumphy, Mr. DePrima stated that the reports are compiled by department,
not by person, and that the next report will include totals.
Furlough Report
Mr. DePrima advised members that employees are abiding by the furlough, which was adopted by
City Council.
In response to Mr. McGlumphy, Mrs. Teresa Tieman, Senior City Administrator, explained that there
are no monies saved, as there were no monies budgeted, for furloughs. She noted that there was a
“cost avoidance”.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of the Hiring Freeze
for Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review and
approval of the Legislative, Finance, and Administration Committee and City Council. It was
Page 17
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 13
suggested that there be a “standing” agenda item to consider the filling of critical positions and, if
there are no positions to consider, the item could be removed.
Police Officer
Police Chief Jeffrey Horvath explained that, with the recent retirement of Captain Ray Sammons,
a new vacancy was created. He reminded members that the Police Department’s authorized strength
is currently 91 officers and that the vacant position would need to be filled in order for the City of
Dover to remain compliant with the staffing provisions of the Community Oriented Policing Services
(COPS) grant that was approved by Council on September 14, 2009. Filling this position would
allow the Police Department to maintain 91 officers on duty and Chief Horvath explained its
necessity in order for the City to continue to provide security and safety for the citizens of Dover.
He mentioned that there will be a small savings, as the person he would like to hire is not a certified
police officer and will have to go through the Policy Academy in March or June.
The committee recommended that staff be granted permission to recruit for the position of Police
Officer, as requested by staff.
By consent agenda, Mr. McGlumphy moved for approval of the committee’s recommendation,
seconded by Mr. McGiffin and carried by a unanimous roll call vote.
Proposed Ordinances
Ordinance #2010-01 - Chapter 102 – Taxation, Article I - In General, Section 102-1 - Annual
Valuation and Assessment
Ms. Cheryl Russell, City Assessor, advised members that Ordinance #2010-01 is being brought back
to revert the ordinance to its original intent and to strike out the amendments made by Mayor Carey,
and approved by City Council, on December 14, 2009. The purpose of the amendment is to follow
the recommendations resulting from a June 2008 audit performed by Mr. Frederick Chmura and
Mr. William Ford of the International Association of Assessing Officers (IAAO).
Ms. Russell explained that the recommendation was to prorate the values of properties as of the
annual assessment date of January 1.
Mr. Salters advised members that he does not believe it is fair to tax incomplete properties that are
not making a profit due to the current economic conditions.
Responding to Dr. Jones, Ms. Russell explained that there are two (2) properties that would be
subject to taxation based on the percentage complete after 90 days without construction under the
proposed ordinance changes.
Mr. Anthony DePrima, City Manager, advised members that in order for Ms. Russell to enforce the
90-day window, she would have to visit properties every day to witness that no construction is taking
place.
Page 18
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 14
Mr. Philip McGinnis, McGinnis Commercial Real Estate Company, advised members that he is an
appraiser and has been involved in property tax assessment appeals with the City of Dover for a
number of years. Mr. McGinnis stated that while a building is under construction it generates no
income; therefore, there is no value from an income standpoint, yet the land is still rightfully taxed.
He felt that this ordinance would place a burden on the developer with an unfinished building and
would be unfair to any taxpayer. He further noted that if a building is vacant for a period of time,
the City Planning Department enforces the vacant building ordinance.
Mr. Ruane stated that when a property is under construction it must be insured, so to indicate that
a property under construction has no value is disingenuous. He further explained that although the
City uses three approaches to assess properties (sales, cost, and market) it does not use any single
one, and, although allowed, the approaches are not necessarily applied. He further indicated that
to be fair and equitable, all properties should be assessed equally and justly, stating that waiting until
the building is complete is not normal, accepted practice in the industry.
In response to Council President Williams, Mr. McGinnis stated that the bank requires insurance
during the construction phase in case there is a hazard, so that some repayment of the debt can take
place. Mrs. Williams advised members that the function of the insurance is to protect the capital
investment, which has nothing to do with the value of the property once the certificate of occupancy
has been issued, and that these two issues are separate and should not be compared.
Responding to Mrs. Williams, Mr. McGinnis stated that he knows of no other municipality or
assessing group that taxes properties during construction.
Mr. Tom Burns, Burns and Ellis REALTORS®, 490 N. DuPont Highway, stated that he is not
familiar with the legislation passed by the State of Kansas, which was mentioned in the letter from
Mr. Fred Chmura; however, he felt that the proposed ordinance was a disguised tax increase. He
stated that the City had not presented a reason why additional funds were needed. He advised that
he believes this ordinance will deter developers from building in the City of Dover and that the City
should be more user-friendly to developers. He further noted that insurance on vacant buildings is
nominal and that the bulk of insurance is for liability.
Mr. Ruane stated that although insurance premiums may be low, if the building caught on fire the
policy holder would expect enough funds to be able to rebuild the building to its level of completion
before it burned. He further explained that the intent of the amendment is not to raise taxes but to
conform with national standards. Currently, property under construction in the City of Dover cannot
be taxed until the Certificate of Occupancy is issued. He stated that the common practice in other
states is to assess as of the status on the assessment date. He read into record a recommendation
from the IAAO which states “Valuation of Property as of the Assessment Date: Clarify that all
property is valued as of its ownership and current market value as of the January 1st assessment
date. Currently property under construction cannot be placed on the tax rolls until a Certificate of
Occupancy is issued. This is not common practice in the assessment profession in other states. The
general practice is that all property is assessed as of its status on the assessment date. For example,
if a building is under construction as of January 1st and is 50% complete on that date, then the
assessor values the property as its 50% complete status and places this partial value on the annual
Page 19
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 15
assessment roll. Then the Certificate of Occupancy is issued, the assessor then reassesses the
building and adds the additional increased assessment as a supplemental assessment on the next
quarterly supplemental assessment date. Property receiving a change in zoning or specific use
would also be adjusted based upon the assessment date”.
Mr. Scott Kidner, lobbyist for the Delaware Association of REALTORS®, expressed concern that
there will be legal issues, as the owner of the property might not agree with the percentage of
completion valued by the Assessor’s Office. He further requested that the real estate community be
given notice when issues of importance such as this come before the Committee.
Responding to Mr. McGlumphy, Mr. Kidner stated that if the City decides to approve this
amendment, he would recommend that the City of Dover and the regulating community get together
to address issues that may arise from this matter.
Mr. Hogan stated that, as the policy is currently written, it is almost impossible for the Assessor’s
Office to enforce.
Dr. Jones stated that the City of Dover should encourage development and operate in a manner of
goodwill. She felt that the Assessor’s Office and concerned others should work together to develop
a workable plan.
Ms. Jennifer Casey, Executive Vice President for the Homebuilders Association of Delaware and
resident of the City of Dover, stated that this amendment will increase the cost of residential
construction and will impact affordable housing. She further noted that the Economic Development
Office brainstorms on how to bring businesses in and this ordinance amendment is unfair to
long-term residents of this city when they are investing their money during difficult economic times.
Ms. Casey stated that if the City of Dover is the only place in Delaware with this ordinance, investors
and homebuyers will not come, which she felt would negate the small increase in the budget.
Mr. Mike Harrington, Harrington ERA Realty, Inc., stated that everyone has worked very hard to
promote the City of Dover. He believes that the City of Dover is sending a negative message to the
community, which will single the city out. He expressed confidence that City Council will make the
right decision.
Dr. Jones stated that she would like to see research conducted so that factual information can be
provided to the Committee.
Mr. McGlumphy stated that he would like to see what is done in the State of Delaware, not other
states, as the recommendations stated. He suggested a middle ground can be found during
discussion.
The committee recommended that the City Assessor’s Office, the City Manager’s Office and the
Real Estate Community meet to attain a workable solution within 90 days.
By consent agenda, Mr. McGlumphy moved for approval of the committee’s recommendation,
seconded by Mr. McGiffin and carried by a unanimous roll call vote.
Page 20
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 16
Ordinance #2010-02 - Adoption of 2009 ICC Codes (Building Codes)
The committee recommended to table Ordinance #2010-02 - Adoption of 2009 ICC Codes (Building
Codes) to allow the development community time to review.
By consent agenda, Mr. McGlumphy moved for approval of the committee’s recommendation,
seconded by Mr. McGiffin and carried by a unanimous roll call vote.
Health Benefits Committee
Mr. Anthony DePrima, City Manager, advised members that in order to manage the OPEB liability
and annual cost of health benefits, the City Administration is recommending the formation of a
Health Benefits Committee, as appointed by City Council. He further advised that the Committee
membership would consist of the following positions and that meetings would take place during
normal City business hours:
Council Members - two (2) appointed by City Council
City Manager (Ex Officio)
Human Resources Director
Controller/Treasurer
FOP – one (1) representative as appointed by the Union
IBEW – one (1) representative as appointed by the Union
IUE/CWA – one (1) representative as appointed by the Union
Non-Bargaining – one (1) volunteer
Mr. DePrima advised members that the goal of the Health Benefits Committee would be to research
alternative health care plans, alternative vendors, health savings accounts, policy/procedure changes,
or any other options to assist the City in reducing its health care liability and annual cost. In doing
so, the Committee shall maintain quality health insurance that is affordable for the City employees,
customers, and taxpayers. The Committee shall provide their recommendations to City Council by
January 31, 2011.
Mr. DePrima stated that the Committee would not discuss Medicare Part B, as Council will have
made a ruling on this matter and it will be respected.
Mr. DePrima indicated that the Health Benefits Committee may, at times, need to hire consultants
to explain or cost out various options and, in this event, the Committee will be responsible for
developing RFP’s, selecting vendors, and submitting to Council the approval of recommended
vendors, as promulgated by the Purchasing Policy. He further explained that all costs will be paid
from the OPEB Trust Fund.
In response to Mr. Salters, Mr. DePrima stated that the January 31, 2011, date was given to allow
considerable research to take place. He further advised that the meetings would take place once or
twice a month and would be scheduled during normal business hours to eliminate the need for
overtime.
Page 21
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 17
Mr. Ruane stated that he believes excluding any health benefit from discussion is a mistake.
Mr. McGlumphy advised members that he believes that sometimes decisions are made that are not
beneficial in the long-run but can be corrected when revisited.
The committee recommended approval of the formation of a Health Benefits Committee and
appointment of two council members to serve on the Committee, with the understanding that
meetings will be conducted during City business hours.
By consent agenda, Mr. McGlumphy moved for approval of the committee’s recommendation,
seconded by Mr. McGiffin and carried by a unanimous roll call vote.
Proposed Ordinance #2010-03 - FY 2009 Budget Balances and Projected Carry Forward
Balances
Mrs. Donna Mitchell, Controller/Treasurer, advised members that the draft budget ordinance
Amendment #1 is to incorporate into the FY10 budget the final budget balances and project budget
balances carried forward from FY09.
Mrs. Mitchell stated that the General Fund changes incorporate the loss of $775,200 in Municipal
Street Aid funds, which was offset by the adjustment to the beginning budget balance of $812,127.
The Municipal Street Aid Fund has been adjusted, as well, for the $775,200. FY09 encumbrances
have been included for the Police Department and Human Resources Department.
Mrs. Mitchell noted that the Water and Wastewater Fund had a negative beginning budget balance
adjustment in aggregate, which was all attributed to Kent County sewer treatment fees exceeding the
City’s revenues for treatment fees ($497,667).
Mrs. Mitchell advised members that the Electric Revenue Fund had a positive beginning budget
balance adjustment of $3.1 million and that she and the City Manager will discuss the possibility of
eliminating the budgeted $3 million transfer-in from the Rate Stabilization Reserve in the mid-year
review in order to maintain the current reserve balance to address any needs in the FY11 Budget.
She stated that the balance as of June 30, 2009 is $4.7 million. Mrs. Mitchell further explained that
the policy minimum is 3% of budgeted purchased power cost and the maximum is 10% ($2.5 million
to $8.3 million).
Mrs. Mitchell stated that, for the first time in several years, the Worker’s Compensation Fund had
a negative adjustment to the beginning budget balance of $126,345 since expenses exceeded
contributions in FY09. However, she indicated that the fund still remains in a good financial
position with a budget balance of $1.4 million.
Mrs. Mitchell advised that other changes are the elimination of the budget for the Other Post
Employment Benefits Fund as this is now a trust, as adopted by Council in May 2009, and no longer
a governmental fund. In addition, she stated that a $50,000 adjustment was made to the Community
Transportation Fund for the transfer-in as a correction to the budget, and the CDBG Fund budget was
added.
Page 22
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 18
Responding to Mr. Ruane, Mrs. Mitchell confirmed that the revenue projections to keep the budget
balanced have not changed in any significant manner. She further advised that the City Manager
would bring forward any necessary budget adjustments at the mid-year review.
In response to Mr. McGlumphy, Mrs. Mitchell explained that the carry forward balance is $812,127,
and the $775,220 is the loss of the Municipal Street Aid, with the net amount of $36,927 going
toward the ending budget balance.
Responding to Mr. Ruane, Mrs. Mitchell confirmed that the $775,220 will be used to fund the
Municipal Street Aid Program and that any other adjustments would be made during the mid-year
review during the first meeting in March.
The committee recommended adoption of Proposed Ordinance #2010-03, FY 2009 Budget Balances
and Projected Carry Forward Balances.
By consent agenda, Mr. McGlumphy moved for approval of the committee’s recommendation,
seconded by Mr. McGiffin and carried by a unanimous roll call vote. (The First Reading of the
ordinance will take place during the latter part of the meeting).
By consent agenda, Mr. McGlumphy moved for acceptance of the Legislative, Finance, and
Administration Committee Report, seconded by Mr. McGiffin and carried by a unanimous
roll call vote.
QUARTERLY REVENUE REPORT
Mrs. Mitchell, Controller/Treasurer, reviewed the Revenue Report as of December 2009.
Mr. McGlumphy moved for acceptance of the Quarterly Revenue Report as of December 2009,
seconded by Mr. Salters and unanimously carried.
CONFIRMATION OF POLICE PENSION ELECTION - RET. LT. WILLIAM KNOTTS -
THREE YEAR TERM TO EXPIRE JANUARY 31, 2013
The term of office on the Police Pension Board of Ret. Lieutenant William Knotts expires on
January 31, 2010. Pursuant to Section 18-47 of the Pension Plan, notice of an election was given
to all plan members. Only one nomination was received, therefore, no election was held. Chief
Horvath nominated Ret. Lt. William Knotts to serve a three (3) year term, to expire on
January 31, 2013.
By consent agenda, Mr. McGlumphy moved for approval of the nomination of
Ret. Lt. William Knotts to serve on the Police Pension Board, with a three (3) year term to
expire on January 31, 2013. The motion was seconded by Mr. McGiffin and carried by a
unanimous roll call vote.
Page 23
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 19
APPOINTMENT RECOMMENDED BY MAYOR CAREY - BOARD OF ADJUSTMENT -
JAMES KELLER (TO FILL UNEXPIRED TERM OF ED GOATÉ - TERM TO EXPIRE
JULY 2012)
Mayor Carey recommended the appointment of Mr. James Keller to serve on the Board of
Adjustment for a term to expire May July 2012 (to fill the unexpired term of Ed Goaté).
By consent agenda, Mr. McGlumphy moved for approval of the appointment of
Mr. James Keller to the Board of Adjustment, as recommended by Mayor Carey. The motion
was seconded by Mr. McGiffin and carried by a unanimous roll call vote.
APPOINTMENTS - YOUTH ADVISORY COMMITTEE - ONE (1) YEAR TERMS TO
EXPIRE JANUARY 24, 2011
Members were provided recommendations for the appointments to serve on the Youth Advisory
Committee for a one (1) year term to expire January 24, 2011, as follows: Kenny Anderson,
George Antoniou, Amber Draper, Joiya Goldsboro, Meghan Harris, Sarah Harris, Joshua Martin,
Melissa Micek, Briana Mitchell, Amanda Mullnack, Joseph Napolitano, Vi Nguyen, and
Michael Simpkiss.
By consent agenda, Mr. McGlumphy moved for approval of the recommended appointments
to the Youth Advisory Committee for a one (1) year term to expire January 24, 2011. The
motion was seconded by Mr. McGiffin and carried by a unanimous roll call vote.
FIRST READING - PROPOSED ORDINANCE
Council President Williams reminded the public that copies of the proposed ordinance are available
at the entrance of the Council Chambers or can be obtained from the City Clerk's Office. Final
action by Council on the proposed ordinances will take place during the Council Meeting of
February 8, 2010.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of the
Ordinance Amendment as read by the City Clerk, by title only, as follows:
ORDINANCE #2010-03 - FY 2009 BUDGET BALANCES AND PROJECTED CARRY FORWARD BALANCES
COUNCIL MEMBERS ANNOUNCEMENTS
Mr. McGiffin reminded members to mark their calendar for June 26, 2010 for the next African
American Festival.
Mr. Leary moved for adjournment, seconded by Mr. McGlumphy and unanimously carried.
Meeting Adjourned at 9:03 P.M.
Page 24
CITY COUNCIL MEETING OF JANUARY 25, 2010 PAGE 20
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
January 25, 2010, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM/jg
S:\ClerksOffice\Agendas&Minutes\Council-Minutes\2010\01-25-2010.wpd
Exhibits Attached to Original Minutes and File Copy
Exhibit #1 - Presentation entitled "Dover ‘Anchor' Public Library"
Exhibit #2 - Presentation - Revaluation Project
Exhibit #3 - Notice of Property Revaluation
Page 25
WHEREAS, the City of Dover experienced two major winter storms during the month of February 2010, resulting in total
snow accumulations of approximately 34 inches, wind gusts up to 50 miles per hour, and blizzard conditions; and
WHEREAS, the City of Dover staff implemented an Incident Command Structure, which included Mr. Anthony DePrima,
City Manager; Mrs. Kay Dietz-Sass, Public Affairs Coordinator; Mr. Scott Koenig, Public Services Manager;
Mr. Wayne Hutchison, Emergency Management Coordinator; and Mayor Carleton Carey; who worked tirelessly to
coordinate staff efforts to protect the safety and well-being of the residents of the City of Dover; and
WHEREAS, City staff established and maintained an Emergency Call Center manned by employees who offered to work;
Council Members James McGiffin, Sophia Russell, and Beverly Williams; and Mayor Carleton Carey, which operated
for over 90 hours during the snow events, processing over 1375 calls and 28 requests for urgent service during this period;
and
WHEREAS, Public Services Department crews worked twelve (12) hour shifts over a period of six and half days to
remove snow from over 100 miles of City streets and alleys in extremely adverse weather conditions, and staff members
worked to clear sidewalks and City-owned parking areas; and
WHEREAS, the Fire Marshal’s Office responded to fire calls and monitored road conditions to ensure emergency access
during the snow events; and
WHEREAS, Public Utilities staff worked steadfastly to maintain power for City residents during the storms, resulting
in minimal power outages, and to ensure access to streets, wells, and pump stations under conditions including driving
snow and high winds; and
WHEREAS, 54 police officers and dispatchers responded to calls and requests for assistance during the period when City
offices were closed due to inclement weather, and eight (8) of these individuals resided in local hotels during the
emergency because of adverse road conditions; and
WHEREAS; special commendation is due for the hard work and dedication demonstrated by City employees.
THEREFORE; it is deemed an honor and privilege to present this Certificate of Appreciation to the City of Dover
Employees for their diligent efforts and service on behalf of the community.
With Sincere Appreciation from the Mayor and Council
February 22, 2010
CARLETON E. CAREY, SR. BEVERLY C. WILLIAMS
MAYOR COUNCIL PRESIDENT
Page 26
CERTIFICATE OF APPRECIATION
Presented to
Brian E. Lewis
Dover Human Relations Commission
October 13, 2008 - February 1, 2010
Your public service, selflessness, and talents
have increased the quality of life for your
neighbors, and all of Dover
February 22, 2010
CARLETON E. CAREY, SR. BEVERLY C. WILLIAMS
MAYOR COUNCIL PRESIDENT
Page 27
PROCLAMATION
WHEREAS, after centuries of unreciprocated labor as slaves, African Americans gained their
freedom and found themselves in the struggle to make a living; and
WHEREAS, government codes often prevented blacks from owning land in towns and cities,
and in the countryside they were often denied the opportunity to purchase land; and
WHEREAS, pushing against the odds, African Americans became landowners, skilled
workers, small businessmen and women, professionals, and ministers; and
WHEREAS, to fight segregation from the economy, they started their own unions and
professional associations; as a result, in both the late-nineteenth and early twentieth century
we witnessed an unparalleled degree of racial unity and organization; and
WHEREAS, in 1910, a group of dedicated reformers, black and white, gathered to create an
organization now known as the National Urban League to address the needs of African
Americans as they migrated to the cities of the United States; and
WHEREAS, during the month of February the nation proudly celebrates the
accomplishments, contributions, and history of African-Americans. The theme for 2010 Black
History Month is the History of Black Economic Empowerment.
NOW THEREFORE I, CARLETON E. CAREY, SR., MAYOR OF THE CITY OF DOVER,
DELAWARE do hereby proclaim February 2010 as
BLACK HISTORY MONTH
and encourage all citizens to celebrate the contributions of African-Americans to our great
society.
_______________________________________
Carleton E. Carey, Sr.
Mayor
Page 28
SLAVERY APOLOGY RESOLUTION*
"Whereas, human beings were enslaved and forcibly abducted from Africa and other
parts of the world to North America, including Delaware;
"Whereas, Delaware legalized slavery and practiced it throughout its colonial period;
'Whereas, Delaware maintained the inhuman and immoral institution of slavery from the
time the State ratified the Federal Constitution until slavery was outlawed in 1865 by the
13th Amendment to the Constitution, which Delaware voted to reject that year;
"Whereas, Delaware continued to discriminate against those of color by approving
segregation of education in its 1897 State Constitution, a practice that lasted until Brown
v. Board of Education in 1954;
"Whereas, Delaware passed and enforced Jim Crow laws to deny the rights of African
American citizens for much of the 20th century;
“Whereas, Delaware today has to deal with the lasting legacy of slavery: an ongoing
tension between races;
"Whereas, acknowledgment and apology are the first steps in the healing process;
"Be it Therefore Resolved that the Dover Human Relations Commission urges the
Delaware General Assembly to pass a resolution acknowledging and expressing its
profound apology for the State's practice of slavery and for the historic wrongs
committed against all persons who suffered discrimination and injustice under this
dehumanizing system;
"Be it Further Resolved that the DHRC recommends that the Delaware General
Assembly recognize the need to address and educate the citizenry regarding the social
stigma, stereotyping, racial bias and discrimination which prevail in the state today as
vestiges of the institution of slavery;
"Be it Finally Resolved that the DHRC implores all citizens of the State of Delaware to
be tolerant and understanding of one another so as to eliminate all bias, prejudice, and
discriminatory behavior."
·Passed unanimously by the Dover Human Relations Commission on Wednesday, January 27, 2010
Page 29
DOVER HUMAN RELATIONS COMMISSION
Minutes for January 27, 2010
City Hall Council Chambers
PRESENT: Dr. Samuel B. Hoff, Chair, Ms. Ellen O. Wasfi, Mr. Mark Monroe, Ms. Dawn
Allen‐Pyne, Mr. Paul Fleming, Mr. Ivan Finney, And Mr. Roy Sudler, Jr.
I: The meeting was called to order at 7:08 p.m. and there was a moment of silence.
II: There was a motion by Commissioner Wasfi to approve the agenda, and a second
from Commissioner Fleming. All voted in favor, and it was approved.
III: There was a motion by Commissioner Monroe to approve the minutes of the
December 16, 2009 meeting, and Commissioner Allen‐Pyne seconded it. After some
discussion and 2 corrections, all approved it.
The minutes of the January 18, 2010 public forum on the apology for slavery were
brought up for adoption. Dr. Hoff expressed his appreciation for the quick turn
around time made by Contractual Assistant, Mary Walson in typing up the minutes.
Commissioner Allen‐Pyne moved to approve the minutes, and Commissioner
Fleming seconded. There was discussion of the wording of Mr. Brooks statement on
the bottom of page 2, and it was corrected to read “others thought” not that “he
thought” we should let bygones be bygones. All approved this corrected version of
the minutes.
IV: Comments from the Community: Michael L. Baker from Camden, came
forward and read an article he had written last November about the slavery apology.
He wants to look to the future, not the past.
Mr. EShed Alston presented a “written objection, complaint and demand to be
heard” which he read to the DHRC. Copies of this document were supplied to all
commissioners and for the record.
Mr. Fred Tolbert, of Dover, who spoke at the last meeting, expressed his feelings
again tonight that it is appropriate for the State of Delaware, which has such a long
history of adverse race relations, especially below the C&D Canal, to apologize for its
role in slavery. He urged DHRC to push for the apology to help end the adverse
relations between the races.
Mr. Ken Dryden, from Newark, also spoke at the Jan. 18 meeting. Tonight he said he
thought the apology for slavery issue brought up a very touchy subject especially for
Caucasians who do not understand the Black’s anger. He mentioned that he found
records of his ancestors who were listed with pigs & hogs owned by the wealthy
slave owners. He spoke of a monetary obligation, and reparations, that he feels he is
owed because he lost his rightful inheritance.
Page 30
2
V: Chair’s Report:
A: Activities by DHRC Members: Commissioner Sudler spoke to students at the
Dover High School about race relations. He also went to the Martin Luther King Day
prayer breakfast.
Chair Hoff was contacted by the Congressional Quarterly Press and invited to submit
articles on the history of American slavery and segregation, and segregation in
Delaware.
Commissioner Monroe reported that he would be attending an event sponsored by
the Delaware Workforce Diversity Group. They will have General Stacey Harris as
speaker at the event.
B: Status of Filling Vacancies on the DHRC: 3 positions need to be filled, those of
Anlee Baccio‐Walker, Saundra Sutton, and Brian Lewis. Chair Hoff’s job is to be sure
to fill the DHRC with a diverse contingent of commissioners from Dover. He wishes
to have the City post an ad in the newspapers (about $100). Commissioner Monroe
made a motion to approve $ for an ad, and Commissioner Alley‐Pyne seconded. All
approved it. Commissioner Wasfi suggested contacting the papers to see if they
want to do a story about the DHRC, and also see if the local radio would run
something. Possibly the City’s web site could be used to advertise the vacancies.
Commissioner Sudler expressed his concern over the dedication of some of the
commissioners who consistently miss 3 or more consecutive meetings. He wants to
closely monitor who is missing and who is excused.
VI: Committee Reports:
A: Intake Screening: There has been an intake filing at City Hall. Chair Hoff met
with the person in early January. The process has started, and may take place in
February. The role of the DHRC is to formulate resolutions and request the City
Council to assist in resolving the issues. The State HRC will be invited to this
hearing.
B: Community Programs: Commissioner Sudler has been conducting a survey of
race relations issues at Dover High. He will work with Commissioner Wasfi on the
project to get the teachers on board in an after school program.
C: School Programs: Commissioner Wasfi was having some difficulty with logistics
and scheduling of her school programs. She will work with Commissioner Sudler as
stated above.
D: Nominating Committee: Commissioner Monroe has not received nominations
for the open seats yet. He will take nominations from the floor at next meeting.
Page 31
3
VII: Unfinished Business:
A: Slavery Apology: Chair Hoff gave an overview of the process beginning in April
2007 when the resolution was tabled by the City Council so that more discussion
from the public could be obtained. DHRC picked up the issue in earnest in 2009
having 2 more public meetings hearing 80 to 90 people in all. The resolution now
has revisions due to the views and comments from the community. An
overwhelming number of people support the resolution, but it is not unanimous.
There is some split between Caucasian and Black. The only controversy is over
what we do, not over the facts of slavery. The House and Senate have apologized,
and many States as well. DHRC has no monopoly on morality; DHRC represents the
majority of the people in the city of Dover in taking up this resolution. There was a
motion by Commissioner Monroe to approve the resolution, and Commissioner
Sudler seconded it. There ensued a discussion of wording, and comments were
heard from the public on a few aspects of the resolution. After changes to the
document were made and read, a vote was taken to approve the amended version of
the resolution. All in favor were: Commissioner Allen‐Pyne, Commissioner Fleming,
Commissioner Finney, Commissioner Wasfi, Commissioner Monroe, and
Commissioner Sudler.
B: Bylaws & Mission Statement: There was no discussion on either.
VII: New Business: No new business.
IX: Announcements: Next DHRC meeting scheduled for February 24, 2010.
X: Adjournment: The meeting ended at 9:05 p.m.
Page 33
35 planning, constructing, acquiring and equipping the Projects or any portion thereof; interest on the Bonds
36 and any interim financing during the construction period and for a period of up to one year following the
37 estimated date of completion; the costs of issuance of the Bonds and any interim financing; the repayment
38 of temporary loans incurred with respect to the Projects; and the reimbursement of authorized costs
39 previously expended by the City from other funds.
40 Section 3. Terms of the Bonds. The Bonds shall be sold to the Delaware Drinking Water State
41 Revolving Fund (the “SRF Fund”) administered by the State of Delaware Department of Health and
42 Social Services pursuant to the terms of its commitment letter dated January 15, 2010 (the “Commitment
43 Letter”), a copy of which is appended hereto as Exhibit B, and the other terms and conditions to be
44 contained in a Financing Agreement between the City and the SRF Fund (the “Financing Agreement”).
45 It is anticipated that the interest rate for the Loan will be based on the SRF Fund Interest Rate
46 Policy.
47 Section 4. Security for the Bonds. The principal, interest and premium, if any, on the Bonds
48 shall be payable solely from the City’s Net Operating Revenue which is hereby pledged to secure the
49 Bonds on a parity with the Outstanding Bonds. The full faith and credit of the City shall not be pledged
50 to pay principal and interest on the Bonds.
51 Section 5. Rate Covenant. The City covenants that it will fix and collect rates, fees and other
52 charges for the use of and for services furnished or to be furnished by the System, and will from time to
53 time revise such rates, fees and other charges so that in each Fiscal year the Net Operating Revenue
54 available to pay debt service on the Bonds will equal at least the principal and interest requirements for
55 the Bonds. If, for any reason, the revenues are insufficient to satisfy the foregoing covenant, the City
56 shall within ninety (90) days adjust and increase its rates, fees and other charges or reduce its Operating
57 Expenses so as to provide sufficient Net Operating Revenue to satisfy such requirement.
58 Section 6. Details of the Bonds. The Mayor and City Treasurer are authorized to determine the
59 details of the Bonds including the following: the date or dates of the Bonds; provisions for either serial or
60 term bonds; sinking fund or other reserve fund requirements; due dates of the interest thereon; the form of
61 the Bonds; the denominations and designations of the Bonds; registration, conversion and transfer
62 provisions; provisions for the receipt, deposit and investment of the proceeds of the Bonds; provisions for
63 the replacement of a lost, stolen, mutilated or destroyed Bonds; and provisions for issuing uncertificated
64 obligations and all procedures appropriate for the establishment of a system of issuing uncertificated debt.
65 The Bonds shall be executed by the manual or facsimile signature of the Mayor and City Treasurer, shall
66 contain an impression of the City Seal of a facsimile thereof and shall be attested by the manual signature
67 of the City Clerk.
68 Section 7. Further Action. The Mayor, the President of the City Council, the City Treasurer, the
69 City Manager and the City Clerk are authorized and directed to take such other action on behalf of the
70 City, as may be necessary or desirable to effect the adoption of this Resolution and the issuance and sale
71 of the Bonds and to provide for their security and to carry out the intent of this Resolution, including the
72 publication of notices and advertisements and the execution and delivery of customary closing
73 certificates.
74 Section 8. Effective Date. This Resolution shall become effective immediately upon its passage.
75 The City Clerk is hereby directed to publish once in a newspaper published in the City a notice in
76 substantially the following form:
2
Page 34
77 “NOTICE IS HEREBY GIVEN that the City Council of The City of Dover, Delaware on
78 __________, 2010 pursuant to Chapter 111, Volume 52, Delaware Laws, as amended, adopted a
79 resolution entitled as follows:
80 “RESOLUTION AUTHORIZING THE ISSUANCE AND SALE OF UP TO $2,404,017
81 WATER AND SEWER REVENUE BONDS OF THE CITY OF DOVER FOR THE CONSTRUCTION
82 OF CERTAIN WATER AND SEWER PROJECTS AND AUTHORIZING ALL NECESSARY
83 ACTION IN CONNECTION THEREWITH”
84 “The purpose of the issuance and sale of said bonds is to provide funds (approximately
85 $2,404,017) to pay a portion of the costs of certain projects including, but not limited to: [(1) Bayard
86 Avenue Water Quality Improvements; (2) Route 13 Water Quality Improvements; (3) East side
87 North State Street.]
88 “Any action or proceeding to contest the validity of said resolution or any of its provisions must
89 be commenced within thirty (30) days after publication of this notice. After expiration of such period of
90 limitation, no right of action or defense founded upon the invalidity of said resolution or any of its
91 provisions shall be asserted, nor shall the validity of said resolution or any of its provisions be open to
92 question in any court upon any ground whatsoever, except in an action or proceeding commenced within
93 such period.”
94 By order of the City Council of the City of Dover.
95 City Clerk
96 ADOPTED this __ day of _______, 2010.
97 CITY OF DOVER, DELAWARE
98 Attest:
99 Clerk, Dover City Council President, Dover City Council
100 APPROVED by the Mayor of the City of Dover on the __ day of ________________, 2010.
101 Mayor
3
Page 35
Exhibit A
Estimated Costs of Projects
Project # Description Project Estimate
WQ0905 Bayard Avenue Water Quality Improvements $ 533,510
WQ0907 Route 13 Water Quality Improvements 1,023,700
WQ0906 East side North State Street 846,807
Total Project Estimates $ 2,404,017
4
Page 36
Exhibit B
Commitment Letter
5
Page 39
MEMORANDUM
Department of Public Services – Planning Office
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
Date: February 3, 2010
To: City Council
From: Ann Marie Townshend, AICP
RE: Rezoning of Lands of JNK, LLC
On January 19, 2010, the Planning Commission held a public hearing on the rezoning of lands of JNK, LLC,
located at 1051 College Road. Following public testimony expressing concerns regarding the requested zoning of
RG-2 (General Residence Zone), the Planning Commission voted to table the application, requesting that the
applicant determine if the project would be feasible if the project were capped at 8 dwelling units per acre (as with
RM-2 Zoning) and that Staff determine the requirements for the road connection through the site to Emerald Point.
Because the dates have been set by City Council, this tabling requires that the date for public hearing and final
action by City Council be rescheduled.
The Planning Staff met with the applicant following the Planning Commission meeting, and the applicant has
requested that the matter remain on the table until the March 15, 2010 Planning Commission meeting, and that the
public hearing and final action by City Council be rescheduled for April 12, 2010.
According to the Zoning Ordinance, Article 10 Planning Commission, Section 5 Amendments:
The city council shall not take action on any such amendment without a report from the planning
commission unless the planning commission fails to render such a report within 75 days after its
regularly scheduled meeting following such referral.
The dates requested by the applicant are consistent with this code citation.
Page 40
UTILITY COMMITTEE
The Utility Committee Meeting was held on January 25, 2010 at 5:00 p.m. with Chairman Ruane
presiding. Members present were Mr. Hogan, Mr. McGiffin, Major Kosior, and Mr. Snaman.
Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Hogan moved for approval of the agenda, seconded by Mr. Snaman and unanimously
carried.
White Oak Solar Project
During their meeting of July 27, 2009, City Council approved the Utility Committee’s
recommendation to authorize the City Manager to execute the Solar Energy Purchase Agreement
with White Oak Solar Energy, LLC, as per the terms outlined in the Agreement. During the
Committee’s consideration of this agreement (meeting of July 13, 2009), members were advised that
the agreement presented was the first agreement to be considered from the negotiation process and,
if approved, the agreement would be followed by a Land Lease Agreement and an Interconnection
Agreement for consideration.
Members were provided the additional agreements for their consideration, as follows:
Energy Land Lease
Mr. Ron Lunt, Public Utilities Director, reminded members that the approved Solar Energy Purchase
Agreement is between White Oak Solar Energy, LLC and the City of Dover for the energy, capacity,
and Renewable Energy Credits generated from a solar photovoltaic electric generation facility
located on the Garrison Tract. He submitted a proposed land lease that will be used to construct the
10 Mw (approximated) solar facility.
Mr. Lunt advised members that the leased lot is currently identified as Lot 15, which is located in
the north-west corner of the Garrison Tract. It is approximately 103.5 acres, of which 96.5 acres is
useable land; the remaining seven (7) acres will be reforested at the City’s request to provide a buffer
between the solar facility and the Wild Meadows development. Since the Renewable Energy Credits
will be purchased by Delmarva Power, Sustainable Energy Utility, Delaware Municipal Electric
Corporation, and the City of Dover, Pace Global recommended that a non-Delaware firm perform
the land valuation to ensure a global view of the property. Pace had worked with Alvarez and Marsal
Real Estate Advisory Services (Alvarez) on a similar project and recommended that staff use them
for this project. The City of Dover contracted with Alvarez and Marsal who performed a complete
land valuation and prepared the Garrison Tract Estimated Land Valuation Report. It was noted that
Alvarez and Marsal recommended that the City collect between $45,000 to $55,000 annually for a
100 acre lot.
Mr. Lunt reviewed highlights of the Energy Land Lease, as follows:
A. The proposed lease will collect $55,000 annually and include a two and one-half
percent annual increase once the construction commences, which is anticipated
to be late spring.
B. From the date of the lease execution until construction begins, White Oak will
pay a monthly rent of $1,000.
Page 41
UTILITY COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 2
C. The lease is for twenty-eight (28) years from the date the facility starts producing
energy, which is anticipated to be in December 2010.
D. White Oak may extend the term in one (1) year increments five (5) times for a
total of five (5) years.
E. White Oak will be responsible for all Real Property Taxes levied by the
appropriate taxing authorities.
F. They have an option of leasing up to an additional ten (10) acres during
construction for forty-six dollars per acre per month to be used as a construction
staging area.
G. The adjoining lots will have a solar easement to ensure that no structures are
constructed that will cause shading on the solar panels. These setbacks are as
follows:
a. Lots to the east and west – forty feet of horizontal distance for every ten
feet of structure or tree height; and
b. Lots to the north and south – twenty-five feet of horizontal distance for
every ten feet of structure or tree height.
H. At the end of the lease White Oak will be required, at its expense, to remove all
the equipment, foundations, structures, and similar facilities and backfill any
holes created by the removal process. This will be financed through a letter of
credit or bond in year fifteen of the Lease.
Mr. Lunt assured members that the Ground Lease had been reviewed by the City’s attorney,
Mr. Kirk Betts of Betts and Holt, and he approved the document in its final form. Staff
recommended that the City Manager be authorized to execute the presented Ground Lease
Agreement with White Oak Solar Energy, LLC, as per the terms outlined in the Lease.
Noting that the Garrison Tract Estimated Land Valuation Report has a report date of May 22, 2009,
Mr. Ruane stated that the fifth and sixth paragraphs (bullets) on page 2, state that: “According to
current city zoning regulations, this classification permits the semi-conductor industry as an
approved use without further review, meaning that a company could receive a building permit after
having their site plan accepted.”; and that “The minimum lot size is presently set at 50 acres.”. For
record purposes, he noted that on October 12, 2009, the City adopted Ordinance #2009-18 that added
electric generation as a permitted use on the site and amended the minimum lot size to 10 acres. The
ordinance has been incorporated in the City Code, Appendix B, Section 20A, Article 4.16 - Zoning
Bulk. He stated that the new reference in the Code to this zoning classification is IPM-2.
Mr. Ruane provided members with a copy of the “Dover SUN Park (DSP) – A Solar Milestone for
Delawareans” and referred to the timeline provided on page 4 (Attachment #1). He noted that on
February 16, 2010, the Planning Commission will be conducting a site plan review for this project
and that each parcel of the tract will be reviewed.
Mr. Hogan moved to recommend that the City Manager be authorized to execute the presented
Ground Lease Agreement with White Oak Solar Energy, LLC, as per the terms outlined in the
Lease (Attachment #2), as recommended by staff. The motion was seconded by Mr. Snaman
and unanimously carried.
Page 42
UTILITY COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 3
Energy Interconnection Agreement
Members were provided a Small Generator Interconnection Agreement between the City of Dover
and White Oak Solar Energy, LLC, for their review. Mr. Lunt explained that in order for White Oak
Solar Energy to transmit the power from the site, it will be necessary for them to interconnect to the
City’s 69kV distribution system. The Agreement outlines the methods and expectations of the
interconnection, notices of outages, construction standards, etc. Mr. Lunt reviewed the provisions
of the Interconnection Agreement as follows:
A. White Oak will construct the facility according to national standards as
recognized by the industry.
B. White Oak will own and install the metering and will be required to test the
meter every three (3) years.
C. White Oak is required to maintain a 98.5% power factor (which is the same
requirement that Dover has with Delmarva Power).
D. Dover will be notified of any testing and may witness this testing to ensure that
the new system will operate properly and not adversely affect the Dover
distribution system.
E. White Oak will be authorized to operate the generation in parallel with the Dover
system.
F. The Term of the agreement is twenty (20) years from commercial operation date
and White Oak may extend this period annually until such time as they terminate
the interconnection.
G. There is no compensation to Dover since Dover is purchasing all the energy
under a separate Solar Energy Purchase Agreement.
H. Dover agrees to not disconnect the generation for routine maintenance during the
months of June, July, August, or September.
I. White Oak will be financially responsible for all of the expenses related to
modifying the existing 69 kV system to allow the interconnection of the
generation. White Oak will also be responsible for the construction and
maintenance of the interconnection substation located on the generation site.
J. In conjunction with the project there will be a 69 kV overhead line extension,
approximately one-half mile long, constructed from the existing 69 kV line to the
generation site. White Oak will construct this line and turn it over to Dover; this
will allow Dover to use the poles for any 12 kV services that they choose.
K. Dover supplied White Oak with a detailed Technical Requirements Attachment
that specifies the equipment and communication requirements for all the
components and systems that could impact Dover’s 69 kV network. White Oak
will be required to comply with these requirements.
Mr. Lunt assured members that the Agreement has been reviewed by the City’s attorney,
Mr. Kirk Betts of Betts and Holt, and that he has approved the document in its final form.
Mr. Hogan moved to recommend that the City Manager be authorized to execute the presented
Small Generator Interconnection Agreement with White Oak Solar Energy, LLC, as per the
terms outlined in the Agreement (Attachment #3). The motion was seconded by Mr. Snaman
and unanimously carried.
Page 43
UTILITY COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 4
Energy Transmission Tariff
Mr. Ron Lunt, Public Utilities Director, advised members that White Oak Solar Energy
(White Oak), LLC, has requested the development of a standard tariff for the delivery of energy and
capacity to the PJM grid through the Delmarva Power and Light transmission network. He explained
that the tariff would be required, should the City default on the Solar Energy Purchase Agreement,
or at the end of the Agreement. Realistically, he stated that the only occasion that the tariff would
be used is if the City were to no longer take power from the solar facility, in which case the City
would be in default for the first 20 years of the Agreement, which would be highly unlikely but
possible. After the 20 years, Mr. Lunt stated that the City may or may not choose to take energy
from the facility and that will be determined at that time.
Mr. Lunt reviewed a summary of the provisions contained in the recommended Tariff, as follows:
A. This tariff limits the transmission of energy at 10 Mw AC.
B. White Oak would be required to reserve capacity of the 69 kV system on an
annual basis.
C. The City of Dover would not be required to facilitate any required
interconnection or other agreements; this would be White Oak’s responsibility.
D. The City of Dover would not be required to expand capacity on the network to
facilitate this reservation; however, White Oak could request expansion at its
own expense.
E. White Oak is required to maintain a 98.5% power factor (which is the same
requirement that Dover has with Delmarva Power).
F. The rate for this tariff is $0.23 per kW-month which is consistent with the tariff
titled 69 kV Transmission Service Classification for Transmission Service for 16
Mw EWG Unit operated by NRG Energy. Should White Oak exceed the
reservation request the penalty rate will be $1.00 per kW-month for the penalty
month. Line losses will be recovered by reducing the Net generation by
one-percent, which is also consistent with the existing NRG tariff.
G. The City of Dover reserves the right to adjust this tariff from time-to-time to
reflect changes in the cost of service.
Mr. Lunt indicated that White Oak Solar Energy has reviewed the proposed Tariff and agrees that
it is fair and acceptable. In addition, he assured members that the Tariff has been reviewed by the
City’s attorney, Mr. Kirk Betts of Betts and Holt, and that he approved this Tariff in its final form.
Staff recommended the adoption of the Tariff titled 69 kV Delivery Service Classification to the Grid
for White Oak Solar Energy, LLC, and to recognize this as a standard City of Dover Electric Tariff.
Mr. Hogan moved to recommend approval of staff’s recommendation (Attachment #4),
seconded by Mr. McGiffin and unanimously carried.
At the request of Mr. Ruane, Mr. Lunt reviewed the “Dover SUN Park (DSP) – A Solar Milestone
for Delawareans” document (see Attachment #1).
Page 44
UTILITY COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 5
PACE/NAES Monthly Report (November)
Members were provided the PACE/NAES Monthly Report for November. The report was provided
to allow members the opportunity to monitor what is being sold in electric and the revenues received,
which will give members a better understanding of any fluctuations and make improvements if
deemed necessary. Although it was not staff’s intention to make a presentation of the report, they
welcomed any questions.
Mr. McGiffin moved to recommend acceptance of the report, seconded by Mr. Hogan and
unanimously carried.
Mr. Hogan moved for adjournment, seconded by Mr. McGiffin and unanimously carried.
Meeting Adjourned at 5:34 P.M.
Respectfully submitted,
Eugene B. Ruane
Chairman
EBR/JS/jg/tm
S:\ClerksOffice\Agendas&Minutes\Committee-Minutes\2010\01-25-2010 UTILITY.wpd
Attachments
Attachment #1 - “Dover SUN Park (DSP) – A Solar Milestone for Delawareans”
Attachment #2 - Ground Lease Agreement with White Oak Solar Energy, LLC
Attachment #3 - Small Generator Interconnection Agreement with White Oak Solar Energy, LLC
Attachment #4 - Tariff titled 69 kV Delivery Service Classification to the Grid for White Oak Solar Energy, LLC
Page 45
ATTACHMENT #1
Utiility Committee Meeting of 1/25/2010
Dover SUN Park (DSP) – A Solar Milestone for Delawareans
103.5 acres leased (96.5 useable) and provides • Largest solar plant in the
an anchor project region - community-scale 10
MW AC
• Most competitive photovoltaic
technology
• Distributed - connects directly
into the Dover distribution
system
• Creates 150 local construction
jobs
• Supplies clean power for
ATTACHMENT #1
~1,300 homes
• RPS requires 2% by 2019,
public power is exempt for
now
Utiility Committee Meeting of 1/25/2010
The Power of Integration
Page 46
Dover SUN Park - Continued
• 1400+ seedling
reforestation
plus evergreen
buffer
• Timber harvest
to improve
solar efficiency
• Landscaped
along future
industrial park
road frontage
• Unmanned
operations
• Low traffic
• Good neighbor
The Power of Integration
Page 47
Solar Provides Significant Benefits with Negligible Costs
• Dover SUN Park provides significant environmental and other benefits
– Reduces hazardous air pollutants and other pollution
– Reduces Green House Gases
– Provides taxes and lease revenues
– Construction jobs for 2010
– Provides positive press and an expected catalyst to future development at Garrison Tract
– Provides stable, attractive energy pricing for the next twenty years
– Electricity is produced during daytime hours when electric demand is high – peak energy
• However, solar photovoltaic energy costs more than other forms of energy and that added
cost is paid for by the value in the Solar Renewable Energy Credit (SREC) – the SREC is a
compliance certificate that certifies that solar energy was produced.
– For every Mega Watt Hour a SREC is created that will be sold to the DE utilities including Dover
• Dover will purchase 15% of the SREC’s produced from the facility
• The cost of these SRECs will represent seven-tenths of one percent of Dover’s projected
power supply costs (wholesale costs)
• The SREC cost represents a significant discount compared to the penalty for failure to
comply with legislated requirements.
• Finally, the cost of solar will have a smaller impact on the Dover rate payers than a six cent
increase in natural gas prices.
The Power of Integration
Page 48
Projected Timeline
Site Plan review by
Commissioning /
Dover Planning
testing of solar
Commission
facility
Racking, inverters, &
Utility
Committee Notice to proceed issued PV module installation
to EPC contractor
1/20 1/25 2/8 2/16 Jun Jul Aug Sep Oct Nov Dec 2010
City
Engineering, site Construction of
Council
work & underground interconnection facilities
Joint Signing
and distribution upgrades
Event facilities
DEMEC Board
Meeting Commercial operations
The Power of Integration
Page 49
ATTACHMENT #2
Utiility Committee Meeting of 1/25/2010
GROUND LEASE
by and between
THE CITY OF DOVER, DELAWARE
and
WHITE OAK SOLAR ENERGY, LLC
THIS GROUND LEASE (the “Lease”) made as of the ____________day of
____________, 2010 (the “Effective Date”), by and between the City of Dover,
Delaware, having an address at 15 E. Loockerman Street, Dover, Delaware 19903
(“Dover”) and White Oak Solar Energy, LLC, a Delaware limited liability company,
having an address at c/o LS Power, Two Tower Center, 11th Floor, East
Brunswick, New Jersey 08816 (“Lessee”).
WITNESSETH
WHEREAS, Dover wishes to enter into an agreement with a power
producing company that will develop, construct, own, and operate a solar
photovoltaic electric generating facility with a nameplate rating of approximately 10
MW and ancillary or related services and facilities thereto (the “Facility”); and
WHEREAS, Dover issued an RFP seeking power producers able and willing
to develop, construct, own and operate such a facility, and after reviewing the
proposals received in response to the RFP, Dover selected Lessee to develop,
construct, own and operate the Facility at the site in Dover, Delaware known as the
Garrison Tract (as hereinafter defined); and
WHEREAS, concurrently herewith, Dover is entering into a Solar Energy
Purchase Agreement (“SEPA”) with Lessee pursuant to which Lessee will develop,
construct, improve, repair replace, own and operate the Facility and sell the
energy, capacity, and certain related products to Dover pursuant to the terms of the
SEPA; and
WHEREAS, Dover, for and in consideration of the rents, covenants and
agreement hereinafter mentioned, does hereby lease to Lessee, and Lessee does
hereby lease from Dover, that certain real property described on Exhibit A annexed
hereto and made a part hereof (the “Leased Land”), and all (1) of Dover’s interest
in all property in the nature of buildings, structures and fixtures now and hereafter
situated on such land and constituting parts of the Leased Land, and (2) rights,
interests, powers, licenses, easements, rights-of-way, privileges, hereditaments
and franchises now or hereafter situate thereon or appertaining thereto the Leased
Land or otherwise necessary for development, construction, ownership, operation
and maintenance of the Facility in Lessee’s reasonable discretion (collectively
referred to as the “Premises”).
1
Page 50
WHEREAS, capitalized terms used and not defined in this Lease have the
meanings given to them in Exhibit B hereto.
NOW, THEREFORE, the parties hereto, in consideration of the premises and
covenants herein set forth, and for other good and valuable consideration, receipt
of which is hereby acknowledged, each intending to be legally bound, hereby agree
as follows:
ARTICLE I
LEASE OF THE LAND; RENT; TERM OF LEASE; RENEWAL
Section 1.01. Premises. Dover hereby leases the Premises to Lessee and
Lessee hereby leases the Premises from Dover, subject to and upon the terms,
conditions and undertakings hereinafter set forth.
Section 1.02. Term. The term (as it may be extended or sooner terminated, the
“Term”) of this Lease shall commence on the Effective Date and shall expire on the
twenty-eighth (28th) anniversary of the Commercial Operations Date, subject to the
renewal terms and early termination rights set forth herein (the “Termination Date”);
provided, however, that this Lease shall terminate earlier on the date that is twelve (12)
months after the Effective Date if the Construction Start Up Date has not occurred by
such date, subject to Force Majeure Delays. In the event of any Force Majeure Delays,
any performance date or deadline applicable to Lessee (including, but not limited to, the
Termination Date) shall be extended by the same duration (on a day for day basis) as
the duration of such Force Majeure Delays. Dover grants Lessee five (5) irrevocable
options (each, an “Option” and together, the “Options”)(to be exercised in Lessee’s sole
discretion) to extend the Term by one (1) year for each Option (i.e., 5 years total) by
delivering written notice thereof to Dover not less than nine (9) months prior the then-
scheduled Expiration Date. In addition, at any time prior to the Commercial Operations
Date and after the expiration or early termination of the SEPA, Lessee shall have the
right to terminate this Lease upon not less than three (3) months prior notice to Dover.
Any extension of the term of the SEPA shall not cause an extension of the Term unless
otherwise agreed upon in writing by Lessee and Dover.
Section 1.03. Rent. Lessee shall pay Dover Rent in four (4) equal quarterly
installments, which shall be due on the first Business Day of January, April, July,
and October of each year during the Term, except that the first installment shall be
due thirty (30) days after the Effective Date. For purposes of this Lease, “Rent”
means:
(a) From the Effective Date until the Construction Start Up Date,
the monthly Rent shall be One Thousand Dollars ($1,000.00) per month.
(b) Following the Construction Start Up Date, the annual Rent shall
be Fifty-Five Thousand dollars and no cents ($55,000.00), which shall
2
Page 51
increase by two and one-half percent (2.5%) on each anniversary of such
date.
Section 1.04. Proration. Lessee’s obligation to pay the first and last
installments of Rent under the preceding clauses (a) and (b) of Section 1.03 shall
be prorated on a per diem basis.
ARTICLE II
WARRANTIES
Section 2.01. Warranties of Dover. Dover hereby represents, warrants and
covenants:
(a) That Dover has good and marketable title to the Leased Land, full
power and authority to execute and deliver this Lease, to perform its obligations
hereunder and to grant the rights granted to Lessee hereunder, and duly
authorized the forgoing.
(b) Dover has not received written notice from any governmental
authority pertaining to the violation of any law or regulation pertaining to the
Premises.
(c) Except for Permitted Encumbrances, there are and shall be no
liens, encumbrances, restrictions, covenants, easements or conditions, or other
title defects of record or otherwise, which would adversely affect Dover’s title to
the Leased Land or Lessee’s use or financing of the Leased Land for the Facility;
(d) That all Real Property Taxes and Other Property Taxes of any kind
with respect to the Leased Land, if any, or payments in lieu thereof, have been
paid in full; and
(e) That Dover makes no warranty or representation, express or
implied, as to whether the past uses of the Leased Land complied with federal,
Delaware, or local environmental laws.
Section 2.02. Warranties of Lessee. Lessee represents and warrants to and
covenants with Dover that Lessee has full power and authority to adopt, enter into,
execute and deliver this Lease, and to perform all of its obligations hereunder, and has
duly authorized the foregoing.
ARTICLE III
TAXES
Section 3.01. Taxes.
3
Page 52
(a) Real Property Taxes. Provided that Dover causes all applicable
Real Property Tax bills to be delivered to Lessee not later than thirty (30) days
prior to the applicable due date, Lessee shall pay, prior to delinquency, the Real
Property Taxes, if any, levied or assessed (i) against the Leased Land or (ii) the
Garrison Tract if not a separately taxed parcel (however, Lessee shall only pay
(A) a pro rata amount of such Garrison Tract Real Property Taxes based on the
acreage of unimproved land on the Premises as it bears in relation to the
acreage of unimproved land on the Property) and (B) the Real Property Taxes
levied or assessed with respect to the Facility, in each case for the period
commencing on the Effective Date and ending on the Expiration Date.
(b) Other Property Taxes. Lessee shall pay directly to the taxing
authority any Other Property Taxes levied or assessed against the Premises
(accruing from and after the Construction Start Up Date and before the Expiration
Date) prior to delinquency provided Dover delivers an invoice therefor not later
than thirty (30) days prior to the due date.
(c) Contesting Taxes. Lessee may, at its sole cost and expense,
contest by appropriate legal proceedings conducted in good faith and with due
diligence, the amount or validity or application, in whole or in part, of any taxes or
assessments. Dover management agrees to reasonably cooperate with such
efforts. Dover agrees to promptly cause the Leased Land to be separated as a
legal parcel out of the Garrison Tract if Lessee reasonably believes that its share
of Real Estate Taxes or Other Property Taxes would be less if the Leased Land
was a separately taxed parcel.
ARTICLE IV
ASSIGNMENT AND SUBLETTING OF THE LEASED LAND
Section 4.01. Lessee Assignment. Lessee shall not assign without obtaining
Dover’s written consent for the same. Notwithstanding the foregoing, Lessee may: (i)
assign this Lease without the consent of Dover to any Affiliate of Lessee; (ii) assign,
pledge, hypothecate or otherwise transfer, as and for, among other purposes, collateral
security, in connection with any financing-related or sale-leaseback transaction; and (iii)
grant licenses with respect to the Premises on a temporary basis in connection with the
development, construction, repair, improvement, repowering, operation or replacement
of the Facility (or related improvements). Dover agrees to execute a written consent to
such financing-related or sale-leaseback assignment as may be reasonably requested
from time to time. If such written consent is not requested, Lessee shall notify Dover of
any such assignment no later than thirty (30) days after the assignment. In evaluating a
proposed assignee or sublessee, Dover’s consent shall be deemed unreasonably
withheld if such consent is denied to a party (a) with substantially similar
creditworthiness or valuation as Lessee, and (b) that has at least similar experience as
Lessee in the operation of power generation facilities. Dover shall respond in writing
accepting or denying a proposed assignee or sublettee within 15 days after Lessee’s
request therefor, otherwise Dover’s consent shall be deemed granted.
4
Page 53
ARTICLE V
EASEMENTS; ADDITIONAL SPACE DURING CONSTRUCTION;
QUIET USE AND ENJOYMENT
Section 5.01. Granting Easements. Dover shall grant (and shall reasonably
cooperate with Lessee in obtaining grants from third parties of) such easements,
licenses, rights-of-way or other rights in the Leased Land and adjacent property
owned by Dover, in such form and substance as are determined by Lessee to be
reasonably necessary to construct, maintain, replace, repower, improve, own and
finance the Facility, and the foregoing shall become part of the Premises.
Section 5.02. Permitting and Approvals. Dover shall reasonably cooperate
with Lessee in, and shall support (and not publicly oppose) Lessee’s applications
for, all entitlements (including, but not limited to, all zoning changes or variances,
site plan approvals, building permits, regulatory approvals, interconnection rights
and other licenses, permits and approvals) reasonably required to develop,
construct, replace, repower, improve and operate the Facility.
Section 5.03. Notice of Start of Construction. Lessee shall provide Dover
thirty (30) days notice prior to commencing construction.
Section 5.04. Additional Space During Construction. During the course of
construction of the Facility, Dover, upon thirty days notice by Lessee, shall use its best
efforts to set aside such additional land adjacent to the Premises ( in an amount not to
exceed ten (10) acres) as is reasonably requested by Lessee for the efficient
construction of the Facility. Lessee shall use its commercially reasonable efforts to
minimize interference with the operations of Dover and any other authorized user of the
land adjacent to the Leased Land during the period of construction of the Facility. Once
Dover makes available this additional space, Lessee shall pay Dover forty-six dollars
($46.00) per acre per month or any portion of a calendar month.
Section 5.05. Quiet Use and Enjoyment. Subject to the terms of this Lease,
Lessee shall enjoy the peaceful and quiet use, possession and enjoyment of the
Premises without hindrance or disturbance by Dover or any persons claiming by,
through or under Dover. Dover agrees to warrant and forever defend Lessee’s
exclusive right to such occupancy, use, and enjoyment and the title to the Leased Land
against the claims of any and all persons whomsoever lawfully claim the same, or any
part thereof, by, through or under Dover.
Section 5.06. Setbacks and Shading. Dover shall enforce setbacks on adjoining
uses of the Garrison Tract such that structures and landscaping must be setback from
the Leased Land at (i) a minimum of forty (40) feet of horizontal distance for every ten
(10) feet of structure or tree height for uses that are located to the east or west of any
property line of the Leased Land and (ii) a minimum of twenty-five (25) feet of horizontal
5
Page 54
distance for every ten (10) feet of structure or tree height for uses that are located to the
north or south of any property line of the Leased Land. Dover understands that this
setback is essential to prevent and minimize shading on the Facility and thus maximize
energy production from the Facility, and Lessee and the Facility would be harmed
otherwise. Lessee is hereby permitted to trim and remove trees on the Leased Land in
accordance with local and state ordinances.
ARTICLE VI
USE; SURRENDER; ASSIGNMENT; CONDEMNATION; INSPECTIONS
Section 6.01. Use of the Leased Land. Lessee shall use the Leased Land
solely for the purpose of the development, construction, installation, ownership,
maintenance and operation of the Facility. In addition, at any time and from time to
time during the Term, Lessee may perform such alteration, renovation, repair,
refurbishment, replacement, improvement, repowering, removal, and other work
with regard to any of Lessee’s improvements on the Leased Land (including, but
not limited to, the Facility) as Lessee may elect.
Section 6.02. Surrender of the Leased Land.
(a) Lessee, upon the termination of this Lease, shall surrender
the Leased Land to Dover free and clear of all liens and encumbrances, except
Permitted Encumbrances and those approved by Dover during the Term.
Except as set forth in, and subject to the provisions of the SEPA, upon
termination of the Lease for any reason or upon Lessee’s desertion, vacation,
abandonment of or eviction from the Premises, (1) Lessee shall, at its sole cost
and expense, (i) remove all of its personal property, equipment, fixtures, goods or
other personal property maintained within or on the Premises, (ii) remove any
appurtenances, including foundations, footers, supports, and structures
(including the Facility) placed on the Premises by Lessee and (iii) backfill any
holes or excavations with clean fill material that occur from the removal of the
items in the preceding clause (ii) (“Restoration”), and (2) the Term shall remain in
effect for not more than nine (9) months after such termination (with rent
continuing to be due and payable by Lessee in the amount provided in Section
1.03(b)) in order to permit Lessee to complete its obligations under the preceding
clause (1); provided, however, that Lessee may, upon notice to Dover, terminate
this Lease at any time prior to the expiration of the nine (9) month period
provided Lessee has completed its obligations set forth in the preceding clause
(1).
(b) In order to secure the Restoration obligation, fifteen (15)
years after the Construction Start Up Date, Lessee shall provide Dover with a
letter of credit or bond (“Surety”) in the amount of the estimated costs to
complete the Restoration (“Restoration Costs”). To determine the amount of the
Restoration Costs, Lessee shall provide Dover with a list of at least four
6
Page 55
contractors qualified to provide estimates for the costs of the Restoration and
Dover shall approve at least three of the contractors within (30) Business Days
after receipt of the list. In the event, that Dover does not approve at least three
contractors, Dover shall provide its reasons of disapproval and offer alternative
contractors that are acceptable to Lessor. Lessor shall have three approved
contractors each prepare an estimate of the costs to complete the Restoration
and the average amount of the estimates prepared by the three contractors shall
be the amount of the Restoration Costs for purposes of this Section 6.02(b). The
costs of any such contractors shall be borne by Lessor. On each full calendar
year thereafter, the security for the Restoration Costs shall be increased by an
annual escalation rate of two and one-half percent (2.5%). The Surety is to
remain in effect until the appropriate phase of decommissioning is complete and
all associated costs have been paid in full, free from all liens and claims of
contractors, subcontractors, mechanics, laborers, and materialmen. Lessee shall
provide Dover with information and documentation to confirm the existence and
maintenance of such security in favor of Dover within thirty (30) days of each
anniversary of the date the original Surety is established.
Section 6.03. Assignment by Dover. In no event shall Dover sell or assign
Dover’s interest in the Leased Land unless Lessee has consented to said assignment or
sale in writing and the transferee has fully assumed all of the obligations of Dover under
this Lease.
Section 6.04. Condemnation.
(a) The parties represent and warrant that it is their intention that
neither the Premises, Facility, nor any portion of the foregoing, shall be subject to
a condemnation action or proceeding by the City for the purpose of seizing
property for a public use at anytime during the Term. However, the balance of
the provisions of this Section 6.04 apply in the event that circumstances
affecting the Premises and/or Facility substantially change in the future to the
extent that a condemnation action or proceeding affecting the Premises and/or
Facility becomes necessary.
(b) If any portion of the Premises is taken pursuant to condemnation,
eminent domain, or exercise of a similar power, or transfer under threat of such
compulsory transfer or taking by a governmental authority having jurisdiction
(other than Dover), then this Lease shall terminate as to such portion. Upon a
taking of any portion of the Premises, Rent shall be reduced by an amount equal
to the product of the (a) Rent otherwise payable under this Lease, multiplied by
(b) a fraction, the numerator of which is the square footage of the Premises taken
and the denominator of which is the square footage of Premises immediately
prior to such taking. If the remaining portion of the Premises is insufficient for
Lessee’s use as determined by Lessee in Lessee’s sole and absolute discretion,
Lessee shall have the right to terminate this Lease upon providing thirty (30)
7
Page 56
days’ written notice thereof to Dover. In the event of a complete taking, this
Lease shall terminate and be of no further force or effect.
(c) Both Lessee and Dover shall have the right to participate in any
condemnation proceeding. Each shall notify the other promptly of any
contemplated or threatened condemnation proceeding of which it shall become
aware and shall keep the other informed of developments with respect thereto.
Section 6.05. Compliance Inspections. Dover shall have the right to enter the
Premises (a) at any time, in the case of an emergency, and (b) otherwise at reasonable
times upon not less than five (5) Business Days prior written notice and during normal
business hours, in each case for the purpose of inspecting the condition of the Leased
Land and for verifying compliance by Lessee with this Lease and all applicable laws
and required permits. Lessee may require any parties entering upon the Premises to
adhere to Lessee’s rules and regulations relating to the safety and operation of the
Facility other than in the event of emergencies where adherence to such rules and
regulations would be impracticable.
ARTICLE VII
INSURANCE AND INDEMNIFICATION
Section 7.01. General Liability Insurance. Lessee shall, at its sole cost and
expense, keep and maintain in full force and effect through the Term Comprehensive
General Liability Insurance, and such policy shall name Dover as an additional insured.
Lessee shall also, at its sole cost and expense, keep and maintain in full force and
effect through the Term Workers' Compensation Insurance, as required by law.
Section 7.02. Certificates of Insurance. Upon Dover's request, Lessee shall
deliver to Dover a certificate evidencing such insurance coverage. All insurance
policies shall provide for thirty (30) days advance notice in writing to Dover prior to
modification or cancellation. The insurance required under this Article VII shall be
issued by a solvent company or companies having at the time of issue or reissue a
financial size category of not less than XII and with general policy holders' ratings of not
less than A, as rated in the most current available "Best's" insurance reports.
Section 7.03. Indemnification by Lessee. Lessee shall save, defend, indemnify
and hold harmless Dover and its officials, officers and employees in their official and
personal capacities (collectively, the “Dover Parties”), from all losses, fines, penalties,
costs, suits, proceedings, liabilities, damages, claims and actions of any kind
(collectively, “Liabilities”) arising out of Lessee’s use and occupancy of the Premises or
any buildings or other improvements thereon during the Term hereof; provided,
however, that Lessee’s foregoing shall not extend to any Liabilities relating to (a) any
condition on or under the Premises not caused by Lessee or (b) the negligence or willful
misconduct of any Dover Party. This indemnification shall extend to all claims by any
person or party for death or injury to persons and damage to any property, and to legal
8
Page 57
expense, including reasonable attorneys' fees and court costs. The provisions of this
Article shall survive the termination of this Lease.
Section 7.04. Indemnification by Dover. Dover shall save, defend, indemnify and
hold harmless Lessee, its officials, officers, members, managers, agents and
employees, in their official and personal capacities, from all Liabilities arising out of
Lessee’s use and occupancy of the Premises or any buildings or other improvements
thereon during the Term hereof. This indemnification shall extend to all claims by any
person or party for death or injury to persons and damage to any property, and to legal
expense, including reasonable attorneys' fees and court costs, to the extent that the
same arise from any negligence or willful misconduct of Dover, its contractors or any of
the other Dover Parties. The provisions of this Article shall survive the termination of
this Lease.
ARTICLE VIII
UTILITIES
Section 8.01. Lessee’s Obligations. Unless otherwise provided in the SEPA,
Dover shall have no obligation to pay any utility meter, connection and service charges,
including those for gas, sewer, electricity, water or standby sprinkler and/or any
deposits required by utility suppliers with respect to the Premises. Dover shall
cooperate with Lessee in obtaining any easements from third parties for utility services,
including the execution and delivery of any easement agreements. Lessee may
arrange for and provide such utility and other services to or for the benefit of the
Premises as Lessee deems appropriate and may execute, deliver and record such
agreements in furtherance thereof as Lessee deems appropriate.
ARTICLE IX
ENVIRONMENTAL COMPLIANCE
Section 9.01. No Hazardous Materials. Lessee shall not cause or knowingly
permit any hazardous materials or substances (as such terms are defined in any
environmental laws, rules or regulations) ("Hazardous Materials") to be generated,
produced, brought upon, used, stored, treated, discharged, released, spilled or
disposed of on, in, under or about the Premises in violation of applicable laws by
Lessee, its affiliates, agents, employees, contractors, sublessees, assignees or
invitees. Notwithstanding the foregoing, Lessee shall be permitted to bring upon, use
and store certain Hazardous Materials customarily used in the construction,
maintenance, operation, repairing, improving, replacing and decommissioning of the
Facility by Lessee provided Lessee complies with all environmental laws in connection
therewith.
Section 9.02. Indemnification for Hazardous Materials. Lessee shall indemnify,
defend and save harmless Dover from all Liabilities connected with any spills or
discharges of Hazardous Materials at or on the Premises which occur during the Term
in breach of Lessee’s obligation as set forth in Section 9.01 above (other than with
9
Page 58
respect to matters for which Lessee is liable). Nothing contained herein shall preclude
Lessee’s right to contest, by appropriate proceedings, the validity, or applicability to the
Premises, of any law or requirement of any public authority, or direction of any public
officer. Dover, at Dover's sole cost and expense, shall cooperate fully with Lessee in
any environmental action taken by Lessee with respect to the Premises in furtherance
of Lessee’s obligations under this Lease, including, without limitation, executing and
delivering to Lessee any submissions to, providing information to, and complying with
all requirements of, the Delaware Natural Resources Commission.
Dover shall indemnify, defend and save harmless Lessee, its officials, officers
and employees, in their official and personal capacities, from all losses, fines, penalties,
costs, suits, proceedings, liabilities, damages, claims and actions of any kind arising
out of or in any way connected with any costs, losses or liability arising out of spills or
discharges of Hazardous Materials, violations of Environmental Laws or other
conditions of the Premises which occurred, or were in existence, prior to the
commencement or after the end of the Term or are otherwise caused by Dover.
Section 9.03. Survival of Provisions. The provisions of this Article shall survive
the expiration or termination of this Lease.
ARTICLE X
EVENT OF DEFAULT BY LESSEE
Section 10.01. Default. Lessee shall be in default under this Lease only if,
during the Term, Lessee shall fail to observe any requirement, obligation (including
payment of Rent), agreement, covenant or condition of this Lease, and any such failure
shall continue for thirty (30) days after written notice from Dover specifying the basis for
such default (each, an "Event of Default"); provided, however, that in the event such
failure cannot reasonably be remedied by Lessee within thirty (30) days, no Event of
Default shall occur if Lessee commences to remedy the default within the thirty (30)
day time period and prosecutes the same to completion with diligence.
Section 10.02. Notice, Opportunity to Cure. Subject to the provisions of Article
XI, (1) upon an Event of Default (or for so long as such Event of Default continues),
Dover, without waiving any other rights available to Dover at law or in equity, may
either (a) give Lessee thirty (30) days` written notice of termination of this Lease or (b)
without terminating this Lease, give Lessee notice of Dover's intention to re-enter and
take possession of the Premises pursuant to legal process, and (2) the giving of either
of such notices to Lessee shall precede the termination of Lessee’s right to possession
of the Premises under this Lease, and give rise to the rights of Dover to exercise all
other available legal remedies without discharging Lessee from any of its liabilities or
obligations hereunder, except those that cannot be satisfied in the absence of
possession of the Premises by Lessee.
ARTICLE XI
LESSEE’S FINANCING
Section 11.01. Lessee’s Right to Encumber. Lessee may, from time to time and
at any time, without Dover’s consent or joinder, encumber its interest in this Lease and
the leasehold estate hereby created with one or more deeds of trust, mortgages, or other
10
Page 59
lien instruments to secure any borrowings or obligations of Lessee or Lessee’s affiliates.
Any such mortgages, deeds of trust, and/or other lien instruments, and the indebtedness
secured thereby, provided that Dover has been given notice thereof as set forth in
Section 12.05, are herein referred to as “Permitted Mortgages,” and the holder or other
beneficiary thereof are herein referred to as “Permitted Mortgagees.” No lien of Lessee
upon its interest in this Lease and the leasehold estate hereby created shall encumber or
affect in any way the interest of Dover hereunder or in and to the Leased Property,
except insofar as Dover is obligated to take certain actions as to Permitted Mortgagees
as provided in this Article 11. The Facility and the leasehold estate created hereby shall
at all times remain separate and apart from the title to the Leased Land for all purposes
relating to the interests of any mortgagees of Dover and Lessee.
Section 11.02. Mortgagee Protective Provisions. If Lessee encumbers its
interest in this Lease and the leasehold estate hereby created with liens as above
provided, then Lessee shall notify Dover thereof, providing with such notice the name
and mailing address of the Permitted Mortgagee in question, Dover shall, upon request,
acknowledge receipt of such notice, and for so long as the Permitted Mortgage in
question remains in effect the following shall apply:
(a) Dover shall give to the Permitted Mortgagee a duplicate copy of
any and all notices which Dover gives to Lessee pursuant to the terms hereof,
including notices of default, and no such notice shall be effective until such
duplicate copy is actually received by such Permitted Mortgagee, in the manner
provided in Section 12.05.
(b) There shall be no cancellation, surrender, or modification of this
Lease by joint action of Dover and Lessee without the prior written consent of the
Permitted Mortgagee.
(c) if an Event of Default should occur hereunder, then Dover
specifically agrees that:
(1) Dover shall not enforce or seek to enforce any of its rights,
recourses, or remedies, including but not limited to termination of this Lease
or Lessee’s right to possession hereunder, until a notice specifying the
Default and the event giving rise to such Default has been received by the
Permitted Mortgagee, in the manner provided in Section 12.05, and if the
Permitted Mortgagee proceeds to cure the Event of Default within a period of
30 days after the later of receipt of such notice or the occurrence of such
Event of Default, as to Events of Default which Permitted Mortgagee cannot
reasonably cure within such time period, the Permitted Mortgagee, to the
extent it is reasonably able to do so, commences curing such Event Default
within such time period and thereafter diligently pursues such cure to
completion, then any payments made and all things done by the Permitted
Mortgagee to effect such cure shall be as fully effective to prevent the
exercise of any rights, recourses, or remedies by Dover as if done by Lessee;
11
Page 60
(2) if the Event of Default is a nonmonetary default that a
Permitted Mortgagee cannot reasonably cure without being in possession of
the Premises, then for so long as the Permitted Mortgagee is diligently
attempting to secure possession of the Premises (whether by foreclosure or
other procedures), provided the Permitted Mortgagee cures any monetary
Events of Defaults as well as any other Events of Defaults that are reasonably
susceptible of then being cured by the Permitted Mortgagee, then Dover shall
allow the Permitted Mortgagee such time as may be reasonably necessary
under the circumstances to obtain possession of the Premises in order to
cure such Event of Default, and during such time Dover shall not enforce or
seek to enforce any of its rights, remedies or recourses hereunder; and
(3) if the Event of Default is a non monetary default of such a
nature that it is not reasonably susceptible of being cured by the Permitted
Mortgagee, then Dover shall not enforce or seek to enforce any of its rights,
remedies, or recourses hereunder so long as Permitted Mortgagee pays all
Rent then due and thereafter keeps the monetary obligations of Lessee
hereunder current and complies with those other provisions of this Lease
which, by their nature, Permitted Mortgagee may then reasonably comply
with.
(d) Should the Lease be terminated for any reason other than
expiration of the stated Term, then the Permitted Mortgagee shall have the right
and option, exercisable by delivering notice to Dover not later than 60 days after
receipt from Dover of written notice of such termination (which notice Dover
agrees to give) to elect to receive, in its own name or in the name of its nominee
or assignee, a new lease of the Premises for the unexpired balance of the Term
on the same terms and conditions as herein set forth, having the same priority as
this Lease, and Dover agrees to execute such new lease provided such
Permitted Mortgagee shall undertake forthwith to remedy any then uncured
Event of Default reasonably susceptible by its nature of being remedied by such
Permitted Mortgagee, including the payment of any amount due hereunder.
(e) No Permitted Mortgagee shall be or become liable to Dover as an
assignee of this Lease until such time as such Permitted Mortgagee, by
foreclosure or other procedures, shall either acquire the rights and interests of
Lessee under this Lease or shall actually take possession of the Premises, and
upon such Permitted Mortgagee’s assigning such rights and interests to another
party or upon relinquishment of such possession, as the case may be, such
Permitted Mortgagee shall have no further such liability.
(f) From time to time during the Term, Dover shall, within ten (10)
Business Days after receipt, execute and deliver to a Permitted Mortgagee, or a
prospective Permitted Mortgagee, any estoppel, nondistrubance agreement,
recognition agreement, consent, lien waiver or other commercially reasonable
document requested by any Permitted Mortgagee or prospective Permitted
Mortgagee, in each case in form and substance reasonably acceptable to Dover.
12
Page 61
(g) Dover shall not encumber the Premises (or any interest therein)
without obtaining Lessee’s prior written consent. Lessee may condition its
consent to any encumbrance on fee title to the Leased Land on the execution by
the fee lender of a subordination agreement or a nondisturbance/recognition
agreement in form and substance acceptable to all Permitted Mortgagees.
11.03. Modifications. If any prospective Permitted Mortgagee requires
modifications to this Lease as a condition to granting a Permitted Mortgage, Dover shall
not unreasonably withhold its consent to such modifications, provided that Dover shall
not be required to consent to any such modification pertaining to Rent, the Term, or any
other material economic provision of this Lease, nor to any modification which would
materially decrease Dover’s rights or increase its burdens or obligations hereunder. Any
out of pocket cost incurred by Dover in connection with any such proposed modification
shall be borne by Lessee.
ARTICLE XII
MISCELLANEOUS
Section 12.01. Amendments. The parties hereto may amend this Lease only in
writing. Without limiting the generality of the foregoing, the term of this Lease shall be,
and is hereby, extended to coincide with any extension of the terms of the SEPA.
Section 12.02. Severability. If any term or provision of this Lease, or the
application thereof to any person or circumstances shall to any extent, be invalid or
unenforceable, the remainder of this Lease or the application of such term or provision
to persons or circumstances other than those as to which it is invalid or unenforceable,
shall not be affected thereby, and each term and provision of this Lease shall be valid
and enforceable to the fullest extent permitted by law.
Section 12.03. Waiver. The waiver by either party of any breach of this Lease
shall not be deemed to be a waiver of a subsequent breach of the same or any other
covenant, condition or term of this Lease.
Section 12.04. Merger. This Lease, including all exhibits attached hereto,
constitutes the entire agreement between the parties, and all prior understandings,
agreements and representations have been merged herein.
Section 12.05. Notices and Demands. Notices required by this Lease shall be
addressed to the other Party at the addresses noted in Exhibit C as either Party updates
them from time to time by written notice to the other Party. Any notice, request,
consent, or other communication required or authorized under this Lease to be given by
one Party to the other Party shall be in writing. It shall either be hand delivered or
mailed via overnight service with signature required upon receipt, to the representative
of said other Party. If delivered, the notice, request, consent or other communication
shall be simultaneously sent by facsimile or other electronic means. Any such notice,
13
Page 62
request, consent, or other communication shall be deemed to have been received by
the close of the Business Day on which it was hand delivered or transmitted
electronically (unless hand delivered or transmitted after such close in which case it
shall be deemed received at the close of the next Business Day). Real-time or routine
communications concerning Facility operations shall be exempt from this Section.
Section 12.06. Mutual Waiver of Subrogation. Each party hereby waives any
and all claims which arise or which may arise in its favor and against the other party
hereto during the Term or any extension or renewal thereof for any and all loss of, or
damage to, any of its property located within or upon or constituting a part of the
Facility, to the extent that such loss or damage is recovered under an insurance policy
or policies and to the extent such policy or policies contain provision permitting such
waiver of claims. Each party agrees to request its insurers to issue policies containing
such provisions and if any extra premium is payable therefor, the party which would
benefit from the provision shall have the option to pay such additional premium in order
to obtain such benefit.
Section 12.07. Standard of Approvals. If and to the extent the consent, approval
or similar action of a party is required under this Lease, such consent, approval or
similar action shall not be unreasonably withheld, conditioned or delayed unless
otherwise expressly provided in the terms of this Lease.
Section 12.08. Estoppel Certificate. Dover and Lessee shall execute and deliver
to each other, within 15 Business Days after request therefor by the other party, or by
any Permitted Mortgagee, a certificate addressed as indicated by the requesting party
and stating:
(a) whether or not this Lease is in full force and effect;
(b) whether or not this Lease has been modified or amended in any
respect, and submitting copies of such modifications or amendments;
(c) whether or not there are any existing defaults or Events of Default
hereunder known to the party executing the certificate, and specifying the nature
thereof;
(d) whether or not any particular Article, Section, or provision of this
Lease has been complied with; and
(e) such other matters as may be reasonably requested by the
requesting party.
Section 12.09. Binding Effect. This Lease shall inure to the benefit of and shall
be binding upon Lessee and Dover and their respective successors and assigns.
14
Page 63
Section 12.10. Counterparts. This Lease may be executed in counterparts, each
of which shall constitute original documents, but all of which together shall constitute
one and the same instrument.
Section 12.11. Applicable Law. This Lease shall be interpreted and enforced in
accordance with the laws of Delaware.
Section 12.12. Recording. A memorandum of this Lease shall be recorded by
Lessee, and Dover agrees to execute and acknowledge such memorandum promptly
following Lessee’s request therefor.
Section 12.13. Headings. The headings of the several sections hereof are
inserted for convenience only and shall not control or affect the interpretation of the
provisions hereof.
Section 12.14. Force Majeure. If Dover or Lessee shall be delayed, hindered in
or prevented from the performance of any acts required hereunder, other than the
payment of Rent, by reason of a Force Majeure Delay, then performance of such acts
shall be excused for the period of the delay and the period for the performance of any
such act shall be extended for a period equal to the period of such delay.
Section 12.15. Brokerage. Lessee and Dover each represents and warrants to
the other that it knows of no person who is entitled to a real estate brokerage
commission or sum in lieu thereof in connection with the execution of this Lease or the
creation of the tenancy effected by this Lease and each agrees to save, defend and
indemnify the other from and against any claims, costs or damages attributable to any
misrepresentation or breach of warranty by the indemnitor hereunder.
Section 12.16. No Joint Venture. Nothing contained in this Lease shall be
interpreted as creating a joint venture, partnership, or any other relationship between
the parties, other than the relationship described in this Lease.
Section 12.17 Legal Representation. The provisions of and exhibits to this
Lease have been prepared, examined, negotiated and revised by each party and their
respective lawyers, and no implication shall be drawn and no provision shall be
construed against any party hereto by virtue of the purported identity of the drafter of
the Lease or any portion thereof.
Section 12.18. Recitals Incorporated. The above recitals are incorporated herein
by this reference as part of this Agreement.
Section 12.19. Integration. This Lease and the SEPA constitute the entire
agreement of the parties hereto with respect to its subject matter, and all prior
agreements (whether written or oral) with respect thereto are merged herein. Any
agreements entered into between Dover and Lessee of even date herewith are not,
however, merged herein. Notwithstanding anything to the contrary in this Lease, if and
15
Page 64
to the extent any terms of this Lease conflict with the terms of the SEPA (or any of
them), the terms of the SEPA shall control.
Section 12.20. Attorneys’ Fees. If litigation is ever instituted by either party
hereto to enforce, interpret, or to seek damages for the breach of, any provision hereof,
the prevailing party therein shall be promptly reimbursed by the other party for all
attorneys’ fees and expenses reasonably incurred by the prevailing party in connection
with such litigation.
Section 12.21. Dispute Resolution. It is the intent of the parties that disputes
involving construction or operation of the Facility on the Premises shall be resolved as
quickly as possible.
[remainder of page intentionally left blank – signature page follows]
16
Page 65
IN WITNESS WHEREOF, the parties hereto have executed this Lease as of the
date first above written.
Attest: CITY OF DOVER, DELAWARE
By:_______________________________ By:
Title:______________________________
Attest: WHITE OAK SOLAR ENERGY, LLC
By:_______________________________ By:
Title:______________________________
17
Page 66
EXHIBIT A - LEGAL DESCRIPTION OF LEASED PREMISES
Page 67
EXHIBIT B
CERTAIN DEFINITIONS
1. “Affiliate” shall have the meaning set forth in the SEPA.
2. “Business Day” or “Business Days” shall have the meaning set forth in the
SEPA.
3. Commercial Operations Date” shall have the same meaning set forth in the
SEPA.
4. “Comprehensive General Liability Insurance” means commercial general
liability insurance with a limit of liability shall not be less than $1,000,000 per
occurrence.
5. “Construction Start Up Date” means the date upon which Lessee provides
notice to its engineering, procurement and construction contractor to start
construction of the Facility.
6. “Force Majeure Delay” means a cause or event that actually and proximately
prevents either Party, in whole or in part, from performing any of its
obligations under this Lease including, acts of God; unusually severe actions
of the elements such as floods, inundation, landslides, earthquake, lightning,
hurricanes, or tornadoes; unusually severe weather; terrorism; war (whether
or not declared); sabotage, acts or threats of terrorism, riots or public
disorders; delays in obtaining necessary permits, regulatory approvals and
other entitlements from a Governmental Authority (as defined in the SEPA),
utility or quasi-governmental; strikes or labor disputes not expressly excluded
below; actions or failures to act of an unaffiliated third party supplier of goods
or services (to the extent caused by an event which would meet the definition
of Force Majeure); actions or failures to act of any Governmental Authority
(including the failure to issue permits, blockade, embargo, military or
governmentally usurped power, expropriation or requisition) to the extent
preventing or delaying the performance of the Party claiming Force Majeure;
any delay or extension in the initial Commercial Operations Date permitted
under the SEPA; any delay reasonably necessary in order to achieve
Financial Closing (as defined in the SEPA); and any other event beyond the
reasonable control of the Party claiming Force Majeure, whether or not
foreseeable, but only to the extent the Party claiming Force Majeure is unable
to prevent, avoid or overcome such event through the exercise of
commercially reasonable efforts, and such event is not the result of the fault
or negligence of the Party claiming Force Majeure.
7. “Garrison Tract” means the property identified on Exhibit A .
Page 68
8. “Other Property Taxes” means taxes, other than Real Property Taxes,
assessed or levied against the Leased Land.
9. “Permitted Encumbrances” means:
(a) Real Property Taxes and Other Property Taxes to the extent not
past due or payable;
(b) title encumbrances and matters reasonably acceptable to the
parties, as confirmed in writing by the parties; and
(c) such other easements, reservations, covenants, rights of way and
other title matters that may be caused from time to time by Lessee in order to
facilitate the development, financing, installation and//or operation of the
Facility.
10. “Real Property Taxes” means the real property taxes assessed or levied
against the Leased Land.
11. “Workers’ Compensation Insurance” means workers’ compensation insurance
as to Lessee’s employees involved in the construction, operation, or
maintenance of the Facility in compliance with applicable laws.
Page 69
EXHIBIT C
NOTICE ADDRESSES
FOR DOVER:
Registered/Notice Address:
City Manager
City of Dover Attn: Mr. Anthony DePrima
15 E. Loockerman St. Email: tdeprima@dover.de.us
Dover, DE 19903 Phone: (302) 736-7005
Fax: (302) 736-7002
Copy to:
Public Utilities Director Attn: Mr. Ronald Lunt
860 Buttner Pl. Email: rlunt@dover.de.us
Dover, DE 19904 Phone: (302) 736-7070
Wire Transfer Information - US
Bank:
Account Name: To be provided
Bank Name:
Bank City and State:
ABA# (9 digits):
Account #:
Page 70
FOR LESSEE:
Registered/Notice Address: Attn: David Haden
Two Tower Center, 11th Floor Email: dhaden@LSPower.com
East Brunswick, NJ 08816 Phone: 732-867-5852
Fax: 732-249-7290
Confirmation Address: Attn: David Haden
Two Tower Center, 11th Floor Email: dhaden@LSPower.com
East Brunswick, NJ 08816 Phone: 732-867-5852
Fax: 732-249-7290
cc All invoices and notices to:
Billing Address: Attn: Srinivasan Sridharan
Two Tower Center, 11th Floor Email: ssridharan@LSPower.com
East Brunswick, NJ 08816 Phone: 732-867-5882
Fax: 732-249-6750
Credit Address: Attn: Scott Tansey
Two Tower Center, 11th Floor Email: stansey@LSPower.com
East Brunswick, NJ 08816 Phone: 732-867-5881
Fax: 732-249-7290
Legal Address Attn: David Sass
Two Tower Center, 11th Floor Email: dsass@LSPower.com
East Brunswick, NJ 08816 Phone: 732-867-5853
Fax: 732-249-7290
Operations/Scheduling Notifications Facility Manager
Phone: TBD
Email: TBD
Plant Control Room: TBD
Wire Transfer Information - US
Bank:
Account Name: To be provided
Bank Name:
Bank City and State:
ABA# (9 digits):
Account #:
Page 71
ATTACHMENT #3
Utiility Committee Meeting of 1/25/2010
SMALL GENERATOR
INTERCONNECTION AGREEMENT
Between the City of Dover, Delaware
and
White Oak Solar Energy, LLC
(For Generating Facilities No Larger Than 20 MW)
Page 72
TABLE OF CONTENTS
Page No.
Article 1. Scope and Limitations of Agreement. ................................................................... - 1 -
1.1 Applicability ....................................................................................................... - 1 -
1.2 Purpose................................................................................................................ - 1 -
1.3 No Agreement to Purchase or Deliver Power ..................................................... - 1 -
1.4 Limitations .......................................................................................................... - 2 -
1.5 Responsibilities of the Parties ............................................................................. - 2 -
1.6 Parallel Operation Obligations ............................................................................ - 3 -
1.7 Metering .............................................................................................................. - 3 -
1.8 Reactive Power ................................................................................................... - 4 -
Article 2. Inspection, Testing, Authorization, and Right of Access ..................................... - 4 -
2.1 Equipment Testing and Inspection...................................................................... - 4 -
2.2 Authorization Required Prior to Parallel Operation. .......................................... - 5 -
2.3 Right of Access ................................................................................................... - 5 -
Article 3. Effective Date, Term, Termination, and Disconnection ...................................... - 6 -
3.1 Effective Date ..................................................................................................... - 6 -
3.2 Term of Agreement ............................................................................................. - 6 -
3.3 Termination ......................................................................................................... - 6 -
3.4 Temporary Disconnection................................................................................... - 7 -
3.4.1 Emergency Conditions ............................................................................ - 7 -
3.4.2 Routine Maintenance, Construction, and Repair .................................... - 7 -
3.4.3 Forced Outages ....................................................................................... - 8 -
3.4.4 Adverse Operating Effects ...................................................................... - 8 -
3.4.5 Modification of the Small Generating Facility ....................................... - 8 -
3.4.6 Reconnection........................................................................................... - 8 -
Article 4. Cost Responsibility for Interconnection Facilities and Distribution Upgrades - 9 -
4.1 Interconnection Facilities .................................................................................... - 9 -
4.2 Distribution Upgrades ......................................................................................... - 9 -
Article 5. Cost Responsibility for Network Upgrades .......................................................... - 9 -
5.1 Applicability ....................................................................................................... - 9 -
5.2 Network Upgrades .............................................................................................. - 9 -
5.3 Special Provisions for Affected Systems .......................................................... - 10 -
5.4 Rights Under Other Agreements ....................................................................... - 10 -
Article 6. Billing, Payment, Milestones, and Financial Security ....................................... - 10 -
6.1 Billing and Payment Procedures and Final Accounting ................................... - 10 -
6.2 Milestones. ........................................................................................................ - 11 -
6.3 Financial Security Arrangements ...................................................................... - 11 -
-i-
Page 73
Article 7. Assignment, Liability, Indemnity, Force Majeure, Consequential Damages,
and Default .................................................................................................................. - 12 -
7.1 Assignment ....................................................................................................... - 12 -
7.2 Limitation of Liability....................................................................................... - 13 -
7.3 Indemnity .......................................................................................................... - 13 -
7.4 Consequential Damages .................................................................................... - 14 -
7.5 Force Majeure. .................................................................................................. - 14 -
7.6 Default............................................................................................................... - 15 -
Article 8. Insurance ................................................................................................................ - 16 -
Article 9. Confidentiality ....................................................................................................... - 17 -
Article 10. Disputes ................................................................................................................ - 18 -
Article 11. Taxes ..................................................................................................................... - 19 -
Article 12. Miscellaneous ....................................................................................................... - 19 -
12.1 Governing Law, Regulatory Authority, and Rules ........................................... - 19 -
12.2 Amendment ....................................................................................................... - 19 -
12.3 No Third-Party Beneficiaries ............................................................................ - 19 -
12.4 Waiver ............................................................................................................... - 20 -
12.5 Entire Agreement .............................................................................................. - 20 -
12.6 Multiple Counterparts. ...................................................................................... - 20 -
12.7 No Partnership .................................................................................................. - 20 -
12.8 Severability ....................................................................................................... - 20 -
12.9 Security Arrangements...................................................................................... - 21 -
12.10 Environmental Releases .................................................................................... - 21 -
12.11 Subcontractors................................................................................................... - 21 -
Article 13. Notices .................................................................................................................. - 21 -
13.1 General .............................................................................................................. - 22 -
13.2 Billing and Payment .......................................................................................... - 22 -
13.3 Alternative Forms of Notice ............................................................................. - 23 -
13.4 Designated Operating Representative ............................................................... - 23 -
13.5 Changes to the Notice Information ................................................................... - 23 -
Article 14. Signatures............................................................................................................. - 24 -
Attachment 1 – Glossary of Terms
Attachment 2 – Description and Costs of the Interconnection Facilities and Metering
Equipment
Attachment 3 – One-line Diagram Depicting the Small Generating Facility, Interconnection
Facilities, Metering Equipment, and Upgrades
Attachment 4 – Milestones
Attachment 5 – Interconnection Requirements and Additional Operating Requirements for
the Interconnection Provider's Distribution System and Affected Systems Needed to Support
- ii -
Page 74
the Interconnection Customer’s Needs
Attachment 6 – Interconnection Provider's Description of its Upgrades and Best Estimate of
Upgrade Costs
Attachment 7 – Rate for Use of Interconnection Provider Distribution System
- iii -
Page 75
This Interconnection Agreement ("Agreement") is made and entered into this
________ day of ________________, 2010, by City of Dover Municipal Electric
Department on behalf of the City of Dover, Delaware ("Interconnection Provider"), and
White Oak Solar Energy, LLC ("Interconnection Customer") each hereinafter sometimes
referred to individually as "Party" or both referred to collectively as the "Parties."
Interconnection Provider Information
City of Dover Public Utilities Department
Attention: Ron Lunt
860 Buttner Place
Dover, DE 19904
Phone: 302-736-7070
Fax: 302-736-7081
email: rlunt@Dover.de.us
Interconnection Customer Information
White Oak Solar Energy, LLC
Attention: David Haden
Address: Two Tower Center, 11th Floor
City: East Brunswick, NJ 08816
Phone: 732-867-5852
Fax: 732-249-7290
Email: dhaden@LSPower.com
In consideration of the mutual covenants set forth herein, the Parties agree as follows:
Article 1. Scope and Limitations of Agreement
1.1 This Agreement shall be used for all Interconnection Requests for Interconnection
Customer’s Small Generating Facility.
1.2 This Agreement governs the terms and conditions under which the Interconnection
Customer’s Small Generating Facility will interconnect with, and operate in parallel
with, the Interconnection Provider's Distribution System.
1.3 This Agreement does not constitute an agreement to purchase or deliver the
Interconnection Customer's power. The purchase or delivery of power and other
services of the Interconnection Customer are covered under a separate Solar Energy
Purchase Agreement between Interconnection Customer and the Interconnection
Small Generator Interconnection Agreement -1-
Page 76
Provider.
1.4 Nothing in this Agreement is intended to affect any other agreement between the
Interconnection Provider and the Interconnection Customer.
1.5 Responsibilities of the Parties
1.5.1 The Parties shall perform all obligations of this Agreement in accordance with
all Applicable Laws and Regulations, Operating Requirements, and Good
Utility Practice.
1.5.2 The Interconnection Customer shall construct, interconnect, operate and
maintain its Small Generating Facility and construct, operate, and maintain its
Interconnection Facilities in accordance with the applicable manufacturer's
recommended maintenance schedule, and in accordance with this Agreement,
and with Good Utility Practice.
1.5.3 The Interconnection Provider shall construct, operate, and maintain its
Distribution System and Interconnection Facilities in accordance with this
Agreement, and with Good Utility Practice.
1.5.4 The Interconnection Customer agrees to construct its facilities or systems in
accordance with applicable specifications that meet or exceed those provided
by the National Electrical Safety Code, the American National Standards
Institute, IEEE, Underwriter's Laboratory, and Operating Requirements in
effect at the time of construction and other applicable national and state codes
and standards. The Interconnection Customer agrees to design, install,
maintain, and operate its Small Generating Facility so as to reasonably
minimize the likelihood of a disturbance adversely affecting or impairing the
system or equipment of the Interconnection Provider and any Affected
Systems.
1.5.5 Each Party shall operate, maintain, repair, and inspect, and shall be fully
responsible for the facilities that it now or subsequently may own unless
otherwise specified in the Attachments to this Agreement. Each Party shall be
responsible for the safe installation, maintenance, repair and condition of their
respective lines and appurtenances on their respective sides of the point of
change of ownership. The Interconnection Provider and the Interconnection
Customer, as appropriate, shall provide Interconnection Facilities that
adequately protect the Interconnection Provider's Distribution System,
personnel, and other persons from damage and injury. The allocation of
responsibility for the design, installation, operation, maintenance and
ownership of Interconnection Facilities shall be delineated in the Attachments
to this Agreement.
Small Generator Interconnection Agreement -2-
Page 77
1.5.6 The Interconnection Provider shall coordinate with all Affected Systems to
support the interconnection.
1.6 Parallel Operation Obligations
Once the Small Generating Facility has been authorized to commence parallel
operation, the Interconnection Customer shall abide by all rules and procedures
pertaining to the parallel operation of the Small Generating Facility in the applicable
control area, including, but not limited to: 1) the rules and procedures concerning the
operation of generation set forth in the City of Dover Interconnection Requirements
or by the applicable system operator(s) for the Interconnection Provider's Distribution
System and; 2) the Operating Requirements set forth in Attachment 5 of this
Agreement.
1.7 Metering
The Interconnection Customer shall be responsible for the Interconnection Provider's
reasonable and necessary cost for the purchase, installation, operation, maintenance,
testing, repair, and replacement of metering and data acquisition equipment specified
in Attachments 2 and 3 of this Agreement, including meters required by Affected
Parties. The Interconnection Customer's metering (and data acquisition, as required)
equipment shall conform to applicable industry rules and Operating Requirements.
1.7.1 A meter of revenue quality and associated equipment shall be installed at or
near the Point of Interconnection and readings shall be available to the
Interconnection Provider, Interconnection Customer, and PJM at all times.
1.7.2 The meter(s) shall be tested by Interconnection Customer according to Good
Utility Practice but no less than every three (3) years or upon request by either
Party. A written report shall be prepared by Interconnection Customer and
provided to Interconnection Provider. The Parties may be present during any
testing of the meter. The Party requesting the test shall be responsible for the
costs of such testing if performed outside of the normal periodic testing
criteria stated in article 1.7.4.
1.7.3 Each Party shall have the right to install back up metering. Back up metering,
if it is ever to be relied upon for revenue, shall be of the same manufacturer
and model as the primary revenue meter. Back up metering shall be tested
according to the same procedures and standards as the primary metering.
1.7.4 A meter shall be deemed inaccurate if it is inaccurate by more than +/- 1%. If
a meter is found to be inaccurate, the Parties may use the back up metering, if
any, if it has been tested regularly according to the same protocols as the
primary metering. If back up metering is not available or if it is also found to
be inaccurate, the Parties shall estimate the amount of the necessary
adjustment on the basis of deliveries during a period of similar operating
conditions when the primary meter was registering accurately.
Small Generator Interconnection Agreement -3-
Page 78
1.7.5 In the event that the Parties cannot agree on a period during which the
inaccurate measurements were made, the period during which the
measurements are to be adjusted shall be the shorter of (i) the last one-half of
the period from the least previous test of the electric metering device, or (ii)
the one hundred eighty (180) days immediately preceding the test that found
the meter was inaccurate.
1.8 Reactive Power
1.8.1 The Interconnection Customer shall design its Small Generating Facility to
maintain a continuous rated power output at the Point of Interconnection at a
power factor of equal to 98.5% or better unless the Interconnection Provider
has established different requirements that apply to all similarly situated
generators in the control area on a comparable basis.
1.8.2 The Interconnection Provider is required to pay the Interconnection Customer
for reactive power that the Interconnection Customer provides or absorbs from
the Small Generating Facility when the Interconnection Provider requests the
Interconnection Customer to operate its Small Generating Facility outside the
range specified in article 1.8.1.
1.9 Fee for the Use of the System. The Interconnection Customer shall pay the
Interconnection Provider for the use of the System in accordance with the
Interconnection Provider’s Tariff when the Interconnection Customer uses the
Interconnection Providers System to transmit electricity to another Transmission
System.
1.10 Capitalized terms used herein shall have the meanings specified in the Glossary of
Terms in Attachment 1 or the body of this Agreement.
Article 2. Inspection, Testing, Authorization, and Right of Access
2.1 Equipment Testing and Inspection
2.1.1 The Interconnection Customer shall test and inspect its Small Generating
Facility and Interconnection Facilities prior to interconnection in accordance
with the Dover Interconnection Requirements. In addition, periodic testing is
required in accordance with the Dover Interconnection Requirements. The
Interconnection Customer shall notify the Interconnection Provider of such
activities no fewer than five Business Days (or as may be agreed to by the
Parties) prior to such testing and inspection. Testing and inspection shall
occur on a Business Day. The Interconnection Provider may, at its own
expense, send qualified personnel to the Small Generating Facility site to
Small Generator Interconnection Agreement -4-
Page 79
inspect the interconnection and observe the testing. The Interconnection
Customer shall provide the Interconnection Provider a written test report when
such testing and inspection is completed.
2.1.2 The Interconnection Provider shall provide the Interconnection Customer
written acknowledgment that it has received the Interconnection Customer's
written test report. Such written acknowledgment shall not be deemed to be
or construed as any representation, assurance, guarantee, or warranty by the
Interconnection Provider of the safety, durability, suitability, or reliability of
the Small Generating Facility or any associated control, protective, and safety
devices owned or controlled by the Interconnection Customer or the quality of
power produced by the Small Generating Facility.
2.2 Authorization Required Prior to Parallel Operation
2.2.1 Interconnection Provider has attached the Dover Interconnection
Requirements as Attachment 5 of this Agreement. Interconnection Provider
shall notify the Interconnection Customer of any changes to these
requirements as soon as they are adopted.; provided, however, that other than
changes as may be required by Applicable Laws and Regulations,
Interconnection Provider shall not, without Interconnection Customer’s prior
written approval, change the attached Dover Interconnection Requirements in
a manner that would adversely affect the Interconnection Customer.
Interconnection Provider shall make Reasonable Efforts to cooperate with the
Interconnection Customer in meeting requirements necessary for the
Interconnection Customer to commence parallel operations by the in-service
date.
2.2.2 The Interconnection Customer shall not operate its Small Generating Facility
in parallel with the Interconnection Provider's Distribution System without
prior written authorization of the Interconnection Provider. The
Interconnection Provider will provide such authorization once the
Interconnection Provider receives notification that the Interconnection
Customer has complied with all commissioning tests and applicable parallel
operation requirements. Such authorization shall not be unreasonably
withheld, conditioned, or delayed.
2.3 Right of Access
2.3.1 Upon reasonable notice, the Interconnection Provider may send a qualified
person to the premises of the Interconnection Customer at or immediately
before the time the Small Generating Facility first produces energy to inspect
the interconnection, and observe the commissioning of the Small Generating
Facility (including any required testing), startup, and operation for a period of
up to three Business Days after initial start-up of the unit. In addition, the
Small Generator Interconnection Agreement -5-
Page 80
Interconnection Customer shall notify the Interconnection Provider at least
forty-eight hours prior to conducting any on-site verification testing of the
Small Generating Facility.
2.3.2 Following the initial inspection process described above, at reasonable hours
and upon reasonable notice, or at any time without notice in the event of an
emergency or hazardous condition, the Interconnection Provider shall have
access to the Interconnection Customer's premises for any reasonable purpose
in connection with the performance of the obligations imposed on it by this
Agreement or if necessary to meet its legal obligation to provide service to its
customers.
2.3.3 Each Party shall be responsible for its own costs incurred to comply with this
article.
Article 3. Effective Date, Term, Termination, and Disconnection
3.1 Effective Date
This Agreement shall become effective upon execution by the Parties.
3.2 Term of Agreement
This Agreement shall become effective on the Effective Date and shall remain in
effect for a period of twenty years from the commercial operation date of the Small
Generating Facility, or such other longer period as the Interconnection Customer may
request, and shall be automatically renewed for each successive one-year period
thereafter, unless terminated earlier in accordance with article 3.3 of this Agreement.
3.3 Termination
No termination shall become effective until the Parties have complied with all
Applicable Laws and Regulations applicable to such termination; provided, however,
that the Parties understand and agree that this Agreement is not jurisdictional to the
Federal Energy Regulatory Commission.
3.3.1 The Interconnection Customer may terminate this Agreement at any time by
giving the Interconnection Provider twenty (20) Business Days written notice.
3.3.2 Either Party may terminate this Agreement after Default pursuant to article
7.6.
3.3.3 Upon termination of this Agreement, the Small Generating Facility will be
disconnected from the Interconnection Provider's Distribution System. All
costs required to effectuate such disconnection shall be borne by the
terminating Party, unless such termination resulted from the non-terminating
Party’s Default of this Agreement or such non-terminating Party otherwise is
Small Generator Interconnection Agreement -6-
Page 81
responsible for these costs under this Agreement.
3.3.4 The termination of this Agreement shall not relieve either Party of its
liabilities and obligations, owed or continuing at the time of the termination.
3.3.5 This provisions of this article shall survive termination or expiration of this
Agreement.
3.4 Temporary Disconnection
Temporary disconnection shall continue only for so long as reasonably necessary
under Good Utility Practice.
3.4.1 Emergency Conditions -- "Emergency Condition" shall mean a condition or
situation: (1) that in the judgment of the Party making the claim is
imminently likely to endanger life or property; or (2) that, in the case of the
Interconnection Provider, is imminently likely (as determined in a non-
discriminatory manner) to cause a material adverse effect on the security of,
or damage to, the Distribution System, the Interconnection Provider's
Interconnection Facilities or the Affected Systems to which the Distribution
System is directly connected; or (3) that, in the case of the Interconnection
Customer, is imminently likely (as determined in a non-discriminatory
manner) to cause a material adverse effect on the security of, or damage to,
the Small Generating Facility or the Interconnection Customer's
Interconnection Facilities. Under Emergency Conditions, the Interconnection
Provider may immediately suspend interconnection service and temporarily
disconnect the Small Generating Facility. The Interconnection Provider shall
notify the Interconnection Customer promptly when it becomes aware of an
Emergency Condition that may reasonably be expected to affect the
Interconnection Customer's operation of the Small Generating Facility. The
Interconnection Customer shall notify the Interconnection Provider promptly
when it becomes aware of an Emergency Condition that may reasonably be
expected to affect the Interconnection Provider's Distribution System or any
Affected Systems. To the extent information is known, the notification shall
describe the Emergency Condition, the extent of the damage or deficiency, the
expected effect on the operation of both Parties' facilities and operations, its
anticipated duration, and the necessary corrective action.
3.4.2 Routine Maintenance, Construction, and Repair
The Interconnection Provider may interrupt interconnection service or curtail
the output of the Small Generating Facility and temporarily disconnect the
Small Generating Facility from the Interconnection Provider's Distribution
System when necessary for routine maintenance, construction, and repairs on
the Interconnection Provider's Distribution System; provided, however, that
Interconnection Provider may not schedule maintenance during the months of
June, July, August, or September unless agreed to in writing by the
Small Generator Interconnection Agreement -7-
Page 82
Interconnection Customer, or unless such maintenance outages can be
performed at night and do not affect the Small Generating Facility’s
operations during the day. The Interconnection Provider will provide
Interconnection Customer three months advance notice of scheduled
maintenance that could impact the Small Generating Facility. The
Interconnection Provider shall use Reasonable Efforts to coordinate such
reduction or temporary disconnection with the Interconnection Customer, and
shall take into account any reasonable requests by Interconnection Customer
to adjust any scheduled maintenance outage.
3.4.3 Forced Outages
During any forced outage, the Interconnection Provider may suspend
interconnection service to effect immediate repairs on the Interconnection
Provider's Distribution System. The Interconnection Provider shall use
Reasonable Efforts to provide the Interconnection Customer with prior notice.
If prior notice is not given, the Interconnection Provider shall, upon request,
provide the Interconnection Customer written documentation after the fact
explaining the circumstances of the disconnection.
3.4.4 Adverse Operating Effects
The Interconnection Provider shall notify the Interconnection Customer as
soon as practicable if, based on Good Utility Practice, operation of the Small
Generating Facility may cause disruption or deterioration of service to other
customers served from the same electric system, or if operating the Small
Generating Facility could cause damage to the Interconnection Provider's
Distribution System or Affected Systems. Supporting documentation used to
reach the decision to disconnect shall be provided to the Interconnection
Customer upon request. If, after notice, the Interconnection Customer fails to
remedy the adverse operating effect within a reasonable time, the
Interconnection Provider may disconnect the Small Generating Facility. The
Interconnection Provider shall provide the Interconnection Customer with five
Business Day notice of such disconnection, unless the provisions of article
3.4.1 apply.
3.4.5 Modification of the Small Generating Facility
The Interconnection Customer must receive written authorization from the
Interconnection Provider before making any change to the Small Generating
Facility that may have a material impact on the safety or reliability of the
Distribution System. Such authorization shall not be unreasonably withheld.
Modifications shall be done in accordance with Good Utility Practice. If the
Interconnection Customer makes such modification without the
Interconnection Provider's prior written authorization, the latter shall have the
right to temporarily disconnect the Small Generating Facility.
3.4.6 Reconnection
Small Generator Interconnection Agreement -8-
Page 83
The Parties shall cooperate with each other to restore the Small Generating
Facility, Interconnection Facilities, and the Interconnection Provider's
Distribution System to their normal operating state as soon as reasonably
practicable following a temporary disconnection.
Article 4. Cost Responsibility for Interconnection Facilities and Distribution Upgrades
4.1 Interconnection Facilities
4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection
Provider’s study and Interconnection Facilities itemized in Attachment 2 of
this Agreement. The Interconnection Provider shall provide a best estimate
cost, including overheads, for the purchase and construction of its
Interconnection Facilities and provide a detailed itemization of such costs.
Costs associated with Interconnection Facilities may be shared with other
entities that may benefit from such facilities by agreement between the
Interconnection Customer and such other entities.
4.1.2 The Interconnection Customer shall be responsible for all reasonable
expenses, including overheads, associated with (1) owning, operating,
maintaining, repairing, and replacing its own Interconnection Facilities, and
(2) operating, maintaining, repairing, and replacing the Interconnection
Provider's Interconnection Facilities, and an interconnection study.
4.2 Distribution Upgrades
The Interconnection Provider shall design, procure, construct, install, and own the
Distribution Upgrades described in Attachment 6 of this Agreement. If the
Interconnection Provider and the Interconnection Customer agree, the Interconnection
Customer may construct Distribution Upgrades that are located on land owned by the
Interconnection Customer. The actual cost of the Distribution Upgrades, including
overheads, shall be directly assigned to the Interconnection Customer.
Article 5. Cost Responsibility for Network Upgrades
5.1 Applicability
No portion of this article 5 shall apply unless the interconnection of the Small
Generating Facility requires Network Upgrades.
5.2 Network Upgrades
The Interconnection Provider shall design, procure, construct, install, and own the
Network Upgrades described in Attachment 6 of this Agreement. If the
Interconnection Provider and the Interconnection Customer agree, the Interconnection
Customer may construct Network Upgrades that are located on land owned by the
Small Generator Interconnection Agreement -9-
Page 84
Interconnection Customer. Unless the Interconnection Provider elects to pay for
Network Upgrades, the actual cost of the Network Upgrades, including overheads,
shall be borne initially by the Interconnection Customer.
5.2.1. If the Small Generating Facility fails to achieve commercial operation, but it
or another generating facility is later constructed and requires use of the
Network Upgrades, the Interconnection Provider and Affected System
operator shall at that time reimburse the Interconnection Customer for the
amounts advanced for the Network Upgrades. Before any such
reimbursement can occur, the Interconnection Customer, or the entity that
ultimately constructs the generating facility, if different, is responsible for
identifying the entity to which reimbursement must be made.
5.3 Special Provisions for Affected Systems
Unless the Interconnection Provider provides under this Agreement for the repayment
of amounts advanced to any applicable Affected System operators for Network
Upgrades, the Interconnection Customer and Affected System operator shall enter
into an agreement that provides for such repayment. The agreement shall specify the
terms governing payments to be made by the Interconnection Customer to Affected
System operator as well as the repayment by Affected System operator.
5.4 Rights Under Other Agreements
Notwithstanding any other provision of this Agreement, nothing herein shall be
construed as relinquishing or foreclosing any rights, including but not limited to firm
transmission rights, capacity rights, transmission congestion rights, or transmission
credits, that the Interconnection Customer shall be entitled to, now or in the future,
under any other agreement or tariff as a result of, or otherwise associated with, the
transmission capacity, if any, created by the Network Upgrades, including the right to
obtain cash reimbursements or transmission credits for transmission service that is not
associated with the Small Generating Facility.
Article 6. Billing, Payment, Milestones, and Financial Security
6.1 Billing and Payment Procedures and Final Accounting
Within three months of completing the construction and installation of the
Interconnection Provider's Interconnection Facilities and/or Upgrades described in the
Attachments to this Agreement, the Interconnection Provider shall provide the
Interconnection Customer with a final accounting report of any difference between
(1) the Interconnection Customer's cost responsibility for the actual cost of such
facilities or Upgrades, and (2) the Interconnection Customer's previous aggregate
payments to the Interconnection Provider for such facilities or Upgrades. If the
Interconnection Customer's cost responsibility exceeds its previous aggregate
payments, the Interconnection Provider shall invoice the Interconnection Customer
for the amount due and the Interconnection Customer shall make payment to the
Small Generator Interconnection Agreement - 10 -
Page 85
Interconnection Provider within 15 calendar days. If the Interconnection Customer's
previous aggregate payments exceed its cost responsibility under this Agreement, the
Interconnection Provider shall refund to the Interconnection Customer an amount
equal to the difference within 15 calendar days of the final accounting report.
6.2 Milestones
The Parties shall agree on milestones for which each Party is responsible and list
them in Attachment 4 of this Agreement. A Party's obligations under this provision
may be extended by agreement; however, the Interconnection Customer may elect, in
its sole discretion, to delay the commercial operations date of the Small Generating
Facility by up to 6 months upon written notice to the Interconnection Provider. If the
Interconnection Customer provides such notice, the Parties will amend other
milestones, as appropriate. If a Party anticipates that it will be unable to meet a
milestone for any reason other than a Force Majeure Event, it shall immediately
notify the other Party of the reason(s) for not meeting the milestone and (1) propose
the earliest reasonable alternate date by which it can attain this and future milestones,
and (2) requesting appropriate amendments to Attachment 4. The Party affected by
the failure to meet a milestone shall not unreasonably withhold agreement to such an
amendment unless (1) it will suffer significant uncompensated economic or
operational harm from the delay, (2) attainment of the same milestone has previously
been delayed, or (3) it has reason to believe that the delay in meeting the milestone is
intentional or unwarranted notwithstanding the circumstances explained by the Party
proposing the amendment.
6.3 Financial Security Arrangements
At least twenty (20) Business Days prior to the commencement of the design,
procurement, installation, or construction of a discrete portion of the Interconnection
Provider's Interconnection Facilities and Upgrades, the Interconnection Customer
shall provide the Interconnection Provider, at the Interconnection Customer's option,
cash, or in lieu thereof, a guarantee, a surety bond, letter of credit or other form of
security that is reasonably acceptable to the Interconnection Provider and is consistent
with the Delaware Uniform Commercial Code. Such security for payment shall be in
an amount sufficient to cover the costs for constructing, designing, procuring, and
installing the applicable portion of the Interconnection Provider's Interconnection
Facilities and Network Upgrades and shall be reduced on a dollar-for-dollar basis for
payments made to the Interconnection Provider under this Agreement during its term.
In addition:
6.3.1 The guarantee must be made by an entity that meets the creditworthiness
requirements of the Interconnection Provider, and contain terms and
conditions that guarantee payment of any amount that may be due from the
Interconnection Customer, up to an agreed-to maximum amount.
6.3.2 The letter of credit or surety bond must be issued by a financial institution that
is a U.S. commercial bank or the licensed U.S. branch of a foreign commercial
Small Generator Interconnection Agreement - 11 -
Page 86
bank having a Senior Debt Rating equivalent to A- or better as determined by
at least two (2) rating agencies, one of which must be either Standard &
Poor’s or Moody’s or insurer reasonably acceptable to the Interconnection
Provider and must specify a reasonable expiration date.
Article 7. Assignment, Liability, Indemnity, Force Majeure, Consequential Damages,
and Default
7.1 Assignment
7.1.1 Except as permitted in this article 7.1.2, neither Party shall assign this
Agreement or any portion thereof, without the prior written consent of the
other Party, which consent shall not be unreasonably withheld if (i) the
assignor provides at least thirty (30) Days prior notice of any such assignment
to the other Party; (ii) the assignee shall expressly assume the assignor’s
obligations hereunder; (iii) assignment shall not relieve the assignor of its
obligations hereunder in the event the assignee fails to perform; (iv)
assignment shall not impair any security given by Interconnection Customer
hereunder; and (v) the assignee first obtains such approvals as may be
required by all Applicable Laws and Regulations.
7.1.2 Notwithstanding article 7.1.1, Interconnection Customer may: (i) assign this
Agreement without the consent of Interconnection Provider to any Affiliate of
Interconnection Provider; and (ii) assign, pledge, hypothecate or otherwise
transfer, as and for, among other purposes, collateral security, in connection
with any financing or the refinancing of the Facility, including a sale of this
Agreement, together with a sale of the Facility, combined with the lease back
to Interconnection Customer of the Agreement and Facility, as part of a sale-
leaseback financing transaction. In connection with any such permitted
transfer by Interconnection Customer, Interconnection Provider agrees to
execute a written consent to such collateral assignment as may be reasonably
requested, which collateral assignment may include, among other terms,
Interconnection Provider’s agreement not to terminate this Agreement on
account of any Event of Default without written notice to the Financing
Parties and first providing the Financing Parties with such opportunity to cure
such Event of Default. If such written consent is not requested,
Interconnection Customer shall notify Interconnection Provider of any such
assignment to the Financing Parties no later than ten (10) Business Days after
the assignment. Interconnection Customer may subcontract its duties or
obligations under this Agreement without the prior written consent of
Interconnection Provider, provided, that no such subcontract shall relieve
Interconnection Customer of any of its duties or obligations hereunder.
Small Generator Interconnection Agreement - 12 -
Page 87
7.1.3 Any attempted assignment that violates this article is void and ineffective.
Assignment shall not relieve a Party of its obligations, nor shall a Party's
obligations be enlarged, in whole or in part, by reason thereof. An assignee is
responsible for meeting the same financial, credit, and insurance obligations
as the Interconnection Customer. Where required, consent to assignment will
not be unreasonably withheld, conditioned or delayed.
7.2 Limitation of Liability
Each Party's liability to the other Party for any loss, cost, claim, injury, liability, or
expense, including reasonable attorney's fees, relating to or arising from any act or
omission in its performance of this Agreement, shall be limited to the amount of
direct damage actually incurred. In no event shall either Party be liable to the other
Party for any indirect, special, consequential, or punitive damages, except as
authorized by this Agreement.
7.3 Indemnity
7.3.1 This provision protects each Party from liability incurred to third parties as a
result of carrying out the provisions of this Agreement. Liability under this
provision is exempt from the general limitations on liability found in article
7.2.
7.3.2 The Parties shall at all times indemnify, defend, and hold the other Party
harmless from, any and all damages, losses, claims, including claims and
actions relating to injury to or death of any person or damage to property,
demand, suits, recoveries, costs and expenses, court costs, attorney fees, and
all other obligations by or to third parties, arising out of or resulting from the
other Party's action or failure to meet its obligations under this Agreement on
behalf of the indemnifying Party, except in cases of gross negligence or
intentional wrongdoing by the indemnified Party.
7.3.3 If an indemnified person is entitled to indemnification under this article as a
result of a claim by a third party, and the indemnifying Party fails, after notice
and reasonable opportunity to proceed under this article, to assume the
defense of such claim, such indemnified person may at the expense of the
indemnifying Party contest, settle or consent to the entry of any judgment with
respect to, or pay in full, such claim.
7.3.4 If an indemnifying party is obligated to indemnify and hold any indemnified
person harmless under this article, the amount owing to the indemnified
person shall be the amount of such indemnified person's actual loss, net of any
insurance or other recovery.
7.3.5 Promptly after receipt by an indemnified person of any claim or notice of the
commencement of any action or administrative or legal proceeding or
Small Generator Interconnection Agreement - 13 -
Page 88
investigation as to which the indemnity provided for in this article may apply,
the indemnified person shall notify the indemnifying party of such fact. Any
failure of or delay in such notification shall not affect a Party's
indemnification obligation unless such failure or delay is materially
prejudicial to the indemnifying party.
7.4 Consequential Damages
Other than as expressly provided for in this Agreement, neither Party shall be liable
under any provision of this Agreement for any losses, damages, costs or expenses for
any special, indirect, incidental, consequential, or punitive damages, including but not
limited to loss of profit or revenue, loss of the use of equipment, cost of capital, cost
of temporary equipment or services, whether based in whole or in part in contract, in
tort, including negligence, strict liability, or any other theory of liability; provided,
however, that damages for which a Party may be liable to the other Party under
another agreement will not be considered to be special, indirect, incidental, or
consequential damages hereunder.
7.5 Force Majeure
7.5.1 As used in this article, a Force Majeure Event shall mean a cause or event that
actually and proximately prevents either Party, in whole or in part, from
performing any of its obligations under this Agreement including, acts of God;
unusually severe actions of the elements such as floods, inundation,
landslides, earthquake, lightning, hurricanes, or tornadoes; unusually severe
weather; terrorism; war (whether or not declared); sabotage, acts or threats of
terrorism, riots or public disorders; delays in obtaining necessary permits and
regulatory approvals; strikes or labor disputes not expressly excluded below;
actions or failures to act of an unaffiliated third party supplier of goods or
services (to the extent caused by an event which would meet the definition of
Force Majeure); and actions or failures to act of any Governmental Authority
(including the failure to issue permits, blockade, embargo, military or
governmentally usurped power, expropriation or requisition) to the extent
preventing or delaying the performance of the Party claiming Force Majeure;
or any other event beyond the reasonable control of the Party claiming Force
Majeure, whether or not foreseeable, but only to the extent the Party claiming
Force Majeure is unable to prevent, avoid or overcome such event through the
exercise of commercially reasonable efforts, and such event is not the result of
the fault or negligence of the Party claiming Force Majeure. “Force Majeure”
shall not include: (i) any failure of, or delay in performance, or any full or
partial curtailment in the electric output of the Small Generation Facility that
is caused by a labor dispute or strike by Interconnection Customer’s
employees or any employees of Interconnection Customer’s contractors
employed at the Small Generation Facility (except to the extent arising out of
a strike or labor action not directed specifically at the Interconnection
Small Generator Interconnection Agreement - 14 -
Page 89
Customer or the Facility, including without limitation, a national or regional
strike), (ii) market changes in, or that otherwise effect, the price of energy,
capacity or environmental attributes, or (iii) any change in Applicable Law or
Regulations that effects the value or existence of environmental attributes.
7.5.2 If a Force Majeure Event prevents a Party from fulfilling any obligations
under this Agreement, the Party affected by the Force Majeure Event
(Affected Party) shall promptly notify the other Party, either in writing or via
the telephone, of the existence of the Force Majeure Event. The notification
must specify in reasonable detail the circumstances of the Force Majeure
Event, its expected duration, and the steps that the Affected Party is taking to
mitigate the effects of the event on its performance. The Affected Party shall
keep the other Party informed on a continuing basis of developments relating
to the Force Majeure Event until the event ends. The Affected Party will be
entitled to suspend or modify its performance of obligations under this
Agreement (other than the obligation to make payments) only to the extent
that the effect of the Force Majeure Event cannot be mitigated by the use of
Reasonable Efforts. The Affected Party will use Reasonable Efforts to resume
its performance as soon as possible.
7.6 Default
7.6.1 Any of the following shall constitute a Default:
a) A Party’s dissolution or liquidation;
b) A Party’s filing of a voluntary petition in bankruptcy or insolvency or
for reorganization or arrangement under the bankruptcy laws of the
United States or under any insolvency law of any State, or
Interconnection Provider voluntarily taking advantage of any such law
by answer or otherwise.
c) Interconnection Customer’s failure to establish and maintain the
funding of the Security in accordance with Article 6.3.
d) Interconnection Customer’s failure to make any payment due
hereunder that is not cured within ten (10) Days of the date on which
such payment is due shall constitute an Event of Default.
e) A Party’s failure to achieve milestones for which each Party is
responsible as set forth in Attachment 4 of this Agreement.
f) A Party’s failure to comply with any other material obligation under
this Agreement.
7.6.2 No Default shall exist where such failure to discharge an obligation (other
Small Generator Interconnection Agreement - 15 -
Page 90
than the payment of money) is the result of a Force Majeure Event as defined
in this Agreement or the result of an act or omission of the other Party. Upon
a Default, the non-defaulting Party shall give written notice of such Default to
the defaulting Party. Except as provided in article 7.6.1 (d) or for failure to
pay for the services of the Interconnection Provider under its tariffs, the
defaulting Party shall have thirty (30) calendar days from receipt of the
Default notice within which to cure such Default; provided however, if such
Default is not capable of cure within thirty (30) calendar days, the defaulting
Party shall commence such cure within ten (10) calendar days after notice and
continuously and diligently complete such cure within forty-five (45) days
from receipt of the Default notice; and, if cured within such time, the Default
specified in such notice shall cease to exist.
7.6.3 If a Default is not cured as provided in this article, or if a Default is not
capable of being cured within the period provided for herein, the non-
defaulting Party shall have the right to terminate this Agreement by written
notice at any time until cure occurs, and be relieved of any further obligation
hereunder and, whether or not that Party terminates this Agreement, to recover
from the defaulting Party all amounts due hereunder, plus all other damages
and remedies to which it is entitled at law or in equity. The provisions of this
article will survive termination of this Agreement.
Article 8. Insurance
8.1 The Interconnection Customer shall, at its own expense, maintain in force general
liability insurance without any exclusion for liabilities related to the interconnection
undertaken pursuant to this Agreement as set forth in Article XVI of the Solar Energy
Purchase Agreement. The amount of such insurance shall be sufficient to insure
against all reasonably foreseeable direct liabilities given the size and nature of the
generating equipment being interconnected, the interconnection itself, and the
characteristics of the system to which the interconnection is made. Such insurance
shall be obtained from an insurance provider authorized to do business in the State of
Delaware. Certification that such insurance is in effect shall be provided upon
request of the Interconnection Provider, except that the Interconnection Customer
shall show proof of insurance to the Interconnection Provider no later than ten (10)
Business Days prior to the anticipated commercial operation date and annually
thereafter
8.2 The Interconnection Provider agrees to maintain general liability insurance or self-
insurance consistent with the Interconnection Provider’s commercial practice. Such
insurance or self-insurance shall not exclude coverage for the Interconnection
Provider's liabilities undertaken pursuant to this Agreement.
8.3 The Parties further agree to notify each other whenever an accident or incident occurs
Small Generator Interconnection Agreement - 16 -
Page 91
resulting in any injuries or damages that are included within the scope of coverage of
such insurance, whether or not such coverage is sought.
Article 9. Confidentiality
9.1 Confidential Information shall mean any confidential and/or proprietary information
provided by one Party to the other Party that is clearly marked or otherwise
designated "Confidential".
9.2 Confidential Information does not include (i) information which is or becomes
generally available to the public other than as a result of a disclosure or other act by
the Receiving Party or its receiving Party’s Representatives (as defined below); (ii)
information which can be shown by the receiving Party to have been already known
to the receiving Party on a non-confidential basis prior to being furnished to the
receiving Party by the disclosing Party; and (iii) information that becomes available
to the receiving Party on a non-confidential basis from a source other than the
disclosing Party or a representative of the disclosing Party if to the knowledge of the
receiving Party such source was not subject to any prohibition against transmitting the
information to the receiving Party.
9.3 If a receiving Party or its Representatives are requested or required (by a FOIA
request, oral question, interrogatories, requests for information or documents,
subpoena, civil investigative demand or similar process, or by applicable law) to
disclose any Confidential Information, the receiving Party shall promptly notify the
disclosing Party of such request or requirement, if that notification can be made
without violating the terms of such compelled disclosure, so that the disclosing Party
may seek an appropriate protective order or waive compliance with this article 9.3
with respect to such disclosure. If, in the absence of a protective order or the receipt
of a waiver hereunder, the receiving Party or its receiving Party’s Representatives are,
in the opinion of their legal counsel, compelled to disclose the Confidential
Information, the receiving Party and its Representatives may disclose only such of the
Confidential Information to the party compelling disclosure as is required by law and,
in connection with such compelled disclosure, the receiving Party and its
Representatives shall use their reasonable efforts to obtain from the party to whom
disclosure is made written assurance that confidential treatment will be accorded to
such portion of the Confidential Information as is disclosed. Notwithstanding the
foregoing, if a receiving Party believes that it is necessary to disclose Confidential
Information in any proceeding before any applicable Governmental Authority relating
to this Agreement in order to enforce this Agreement, it shall be entitled to make such
disclosure but only if the receiving Party (i) takes all reasonable steps to limit the
scope of any disclosure of Confidential Information; and (ii) uses its best efforts
to make such disclosure of Confidential Information in an executive session or under
a protective order or other similar procedure.
Small Generator Interconnection Agreement - 17 -
Page 92
9.4 Except as otherwise provided for herein, each Party receiving Confidential
Information shall hold such information in confidence and shall not disclose it to any
third party without the prior written authorization from the disclosing Party.
Notwithstanding the foregoing, Confidential Information may be disclosed by the
receiving Party to its affiliates and any of their respective directors, officers,
employees, financial advisors, financing parties, legal counsel, accountants,
purchasers from the Interconnection Customer’s Small Generating Facility,
authorized agents of the receiving Party identified in writing to the Disclosing Party,
and current and potential investors (collectively, " Representatives"), but only if such
Representatives need to know the Confidential Information in connection with this
PPA. The Parties agree that (i) such Representatives will be informed by the
Receiving Party of the confidential nature of the Confidential Information and the
requirement and the limitations of its use, (ii) such Representatives will be required to
agree to and be bound by the terms of this article 9.4 as a condition of receiving the
Confidential Information, and (iii) in any event, the receiving Party will be
responsible for any disclosure of Confidential Information, or any other breach of
confidentiality provisions of this Agreement, by any of its Representatives. Each
Party shall employ at least the same standard of care to protect Confidential
Information obtained from the other Party as it employs to protect its own
Confidential Information.
Article 10. Disputes
10.1 The Parties agree to attempt to resolve all disputes arising out of the interconnection
process according to the provisions of this article.
10.2 In the event of a dispute, either Party shall provide the other Party with a written
Notice of Dispute. Such Notice shall describe in detail the nature of the dispute.
10.3 Any dispute concerning interpretation or clarification of this Agreement, or the
acceptable performance thereof by a Party (“Dispute”), shall be immediately
submitted in writing for resolution to the Interconnection Provider. All
determinations, instructions, and clarifications of the Interconnection Provider shall be
final and conclusive, unless the Interconnection Customer files with Interconnection
Provider a written protest stating clearly and in detail the basis thereof within ten (10)
Business Days after the Interconnection Provider notifies the Interconnection
Customer of any such determination, instruction, or clarification. Interconnection
Provider shall respond to such protest within twenty (20) Business Days of its receipt.
10.4 In the event that use of the procedures set forth in article 10.3 does not lead to
satisfactory resolution of the Dispute, either Party may send a Notice of Dispute to the
other Party and request a conference for resolution of such dispute. Within three (3)
Business Days after delivery of such notice, each Party shall nominate a senior officer
of its management to meet at the Interconnection Provider’s office, or at any other
Small Generator Interconnection Agreement - 18 -
Page 93
mutually agreed location, to resolve the dispute, which conference shall be convened
within ten (10) Business Days after exchange of such nominations unless the parties
mutually agree to another date. In the event the Parties are unable to resolve the
Dispute through the procedures set forth in this article 10.4, either Party shall have the
right to pursue the remedies in accordance with the procedures set forth in article 10.5.
10.5 With respect to any Dispute or claim arising out of or related to this Agreement, or
breach thereof, which cannot be resolved amicably, the Parties consent to the
exclusive jurisdiction of, and venue in, the state or federal courts located in
Wilmington, Delaware.
10.6 During the pendency of any dispute, the Parties will continue to perform the
obligations imposed upon them under this Agreement to the fullest extent possible,
without prejudice to their respective positions in dispute.
Article 11. Taxes
11.1 The Parties agree to follow all applicable tax laws and regulations, consistent with
Internal Revenue Service and Delaware requirements.
11.2 Each Party shall cooperate with the other to maintain the other Party's tax status.
Nothing in this Agreement is intended to adversely affect the Interconnection
Provider's tax exempt status with respect to the issuance of bonds including, but not
limited to, local furnishing bonds.
Article 12. Miscellaneous
12.1 Governing Law, Regulatory Authority, and Rules
The validity, interpretation and enforcement of this Agreement and each of its
provisions shall be governed by the laws of the state of Delaware, without regard to
its conflicts of law principles. This Agreement is subject to all Applicable Laws and
Regulations. Each Party expressly reserves the right to seek changes in, appeal, or
otherwise contest any laws, orders, or regulations of a Governmental Authority.
12.2 Amendment
The Parties may amend this Agreement by a written instrument duly authorized and
executed by both Parties.
12.3 No Third-Party Beneficiaries
This Agreement is not intended to and does not create rights, remedies, or benefits of
any character whatsoever in favor of any persons, corporations, associations, or
entities other than the Parties, and the obligations herein assumed are solely for the
use and benefit of the Parties, their successors in interest and where permitted, their
assigns.
Small Generator Interconnection Agreement - 19 -
Page 94
12.4 Waiver
12.4.1 The failure of a Party to this Agreement to insist, on any occasion, upon strict
performance of any provision of this Agreement will not be considered a
waiver of any obligation, right, or duty of, or imposed upon, such Party.
12.4.2 Any waiver at any time by either Party of its rights with respect to this
Agreement shall not be deemed a continuing waiver or a waiver with respect
to any other failure to comply with any other obligation, right, or duty of this
Agreement. Termination or default of this Agreement for any reason by
Interconnection Customer shall not constitute a waiver of the Interconnection
Customer’s legal rights to obtain an interconnection from the Transmission
Provider. Any waiver of this Agreement shall, if requested, be provided in
writing.
12.5 Entire Agreement
This Agreement, including all Attachments, constitutes the entire agreement between
the Parties with reference to the subject matter hereof, and supersedes all prior and
contemporaneous understandings or agreements, oral or written, between the Parties
with respect to the subject matter of this Agreement. There are no other agreements,
representations, warranties, or covenants which constitute any part of the
consideration for, or any condition to, either Party's compliance with its obligations
under this Agreement.
12.6 Multiple Counterparts
This Agreement may be executed in two or more counterparts, each of which is
deemed an original but all constitute one and the same instrument.
12.7 No Partnership
This Agreement shall not be interpreted or construed to create an association, joint
venture, agency relationship, or partnership between the Parties or to impose any
partnership obligation or partnership liability upon either Party. Neither Party shall
have any right, power or authority to enter into any agreement or undertaking for, or
act on behalf of, or to act as or be an agent or representative of, or to otherwise bind,
the other Party.
12.8 Severability
If any provision or portion of this Agreement shall for any reason be held or adjudged
to be invalid or illegal or unenforceable by any court of competent jurisdiction or
other Governmental Authority, (1) such portion or provision shall be deemed separate
and independent, (2) the Parties shall negotiate in good faith to restore insofar as
practicable the benefits to each Party that were affected by such ruling, and (3) the
remainder of this Agreement shall remain in full force and effect.
Small Generator Interconnection Agreement - 20 -
Page 95
12.9 Security Arrangements
Infrastructure security of electric system equipment and operations and control
hardware and software is essential to ensure day-to-day reliability and operational
security. The Parties will comply with the recommendations offered by the
President's Critical Infrastructure Protection Board and, eventually, best practice
recommendations from the electric reliability authority. All public utilities are
expected to meet basic standards for system infrastructure and operational security,
including physical, operational, and cyber-security practices.
12.10 Environmental Releases
Each Party shall notify the other Party, first orally and then in writing, of the release
of any hazardous substances, any asbestos or lead abatement activities, or any type of
remediation activities related to the Small Generating Facility or the Interconnection
Facilities, each of which may reasonably be expected to affect the other Party. The
notifying Party shall (1) provide the notice as soon as practicable, provided such Party
makes a good faith effort to provide the notice no later than 24 hours after such Party
becomes aware of the occurrence, and (2) promptly furnish to the other Party copies
of any publicly available reports filed with any governmental authorities addressing
such events.
12.11 Subcontractors
Nothing in this Agreement shall prevent a Party from utilizing the services of any
subcontractor as it deems appropriate to perform its obligations under this
Agreement; provided, however, that each Party shall require its subcontractors to
comply with all applicable terms and conditions of this Agreement in providing such
services and each Party shall remain primarily liable to the other Party for the
performance of such subcontractor.
12.11.1 The creation of any subcontract relationship shall not relieve the hiring
Party of any of its obligations under this Agreement. The hiring Party
shall be fully responsible to the other Party for the acts or omissions
of any subcontractor the hiring Party hires as if no subcontract had
been made; provided, however, that in no event shall the
Interconnection Provider be liable for the actions or inactions of the
Interconnection Customer or its subcontractors with respect to
obligations of the Interconnection Customer under this Agreement.
Any applicable obligation imposed by this Agreement upon the hiring
Party shall be equally binding upon, and shall be construed as having
application to, any subcontractor of such Party.
12.11.2 The obligations under this article will not be limited in any way by any
limitation of subcontractor’s insurance.
Article 13. Notices
Small Generator Interconnection Agreement - 21 -
Page 96
13.1 General
Unless otherwise provided in this Agreement, any written notice, demand, or request
required or authorized in connection with this Agreement ("Notice") shall be deemed
properly given if delivered in person, delivered by recognized national currier service,
or sent by first class mail, postage prepaid, to the person specified below:
If to the Interconnection Customer:
White Oak Solar Energy, LLC
Attention: Asset Manager
Address: Two Tower Center, 11th Floor
City: East Brunswick State: NJ Zip: 08816
Phone: 732-249-6750
Fax: 732-249-7290
With a copy to:
White Oak Solar Energy, LLC
Attention: Eric Crawford
Address 5000 Hopyard Road, Suite 480
City: Pleasanton State: CA Zip: 94588
Phone: 925-201-5234
Fax: 925-201-5230
If to the Interconnection Provider:
City of Dover Public Utilities Department
Attention: Ron Lunt
Address: 860 Buttner Place
City: Dover State: DE Zip: 19904
Phone: 302-736-7070
Fax: 302-736-7081
13.2 Billing and Payment
Billings and payments shall be sent to the addresses set out below:
Interconnection Customer:
White Oak Solar Energy, LLC
Attention: David Haden
Address: Two Tower Center, 11th Floor
City: East Brunswick, NJ 08816
Phone: 732-867-5852
Fax: 732-249-7290
Small Generator Interconnection Agreement - 22 -
Page 97
If to the Interconnection Provider:
City of Dover Finance Department
Attention: Controller - Donna Mitchell
Address: P.O. Box 475
City: Dover State: DE Zip: 19903-0475
Phone: 302-736-7018
Fax: 302-736-7177
13.3 Alternative Forms of Notice
Any notice or request required or permitted to be given by either Party to the other
and not required by this Agreement to be given in writing may be so given by
telephone, facsimile or e-mail to the telephone numbers and e-mail addresses set out
above.
13.4 Designated Operating Representative
The Parties shall designate operating representatives to conduct the communications
which may be necessary or convenient for the administration of this Agreement. This
person will also serve as the point of contact with respect to operations and
maintenance of the Party’s facilities.
Interconnection Customer’s Operating Representative:
Interconnection Customer:
White Oak Solar Energy, LLC
Attention: Asset Manager
Address: Two Tower Center, 11th Floor
City: East Brunswick State: NJ Zip: 08816
Phone: 732-249-6750
Fax: 732-249-7290
Interconnection Provider’s Operating Representative:
Interconnection Provider:
City of Dover Public Utilities Department
Attention: Steve Enss
Address: 860 Buttner Place
City: Dover State: DE Zip: 19904
Phone: 302-736-7086
Fax: 302-736-7081
Email: sEnss@dover.de.us
13.5 Changes to the Notice Information
Either Party may change this information by giving five Business Days written notice
prior to the effective date of the change.
Small Generator Interconnection Agreement - 23 -
Page 98
Article 14. Signatures
IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by their
respective duly authorized representatives.
For the Interconnection Provider
Name: ___________________________________________
Title: ___________________________________________
Date: ___________________
For the Interconnection Customer
Name: ___________________________________________
Title: ___________________________________________
Date: ___________________
Small Generator Interconnection Agreement - 24 -
Page 99
Attachment 1
Glossary of Terms
Affected System – An electric system other than the Interconnection Provider's Distribution
System that may be affected by the proposed interconnection.
Applicable Laws and Regulations – All duly promulgated applicable federal, state and
local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or
administrative orders, permits and other duly authorized actions of any Governmental
Authority.
Business Day – Any calendar Day that is not a Saturday, a Sunday, or a NERC, state and/or
federal recognized holiday where banks in Delaware are permitted or authorized to close.
Default – The failure of a breaching Party to cure its breach under the Small Generator
Interconnection Agreement.
Dover Interconnection Requirements means the Technical Requirements for
Interconnection of White Oak Solar Energy, LLC 10 MW Photovoltaic Plant to the City of
Dover Electric Transmission System, of even date herewith.
Distribution System – The Interconnection Provider's facilities and equipment used to
transmit electricity to ultimate usage points such as homes and industries directly from
nearby generators or from interchanges with higher voltage transmission networks which
transport bulk power over longer distances.
Distribution Upgrades – The additions, modifications, and upgrades to the Interconnection
Provider's Distribution System at or beyond the Point of Interconnection to facilitate
interconnection of the Small Generating Facility. Distribution Upgrades do not include
Interconnection Facilities.
Good Utility Practice – Any of the practices, methods and acts engaged in or approved by a
significant portion of the electric industry during the relevant time period, or any of the
practices, methods and acts which, in the exercise of reasonable judgment in light of the facts
known at the time the decision was made, could have been expected to accomplish the
desired result at a reasonable cost consistent with good business practices, reliability, safety
and expedition. Good Utility Practice is not intended to be limited to the optimum practice,
method, or act to the exclusion of all others, but rather to be acceptable practices, methods, or
acts generally accepted in the region.
Governmental Authority – Any federal, state, local or municipal governmental body; any
governmental, quasi-governmental, regulatory or administrative agency, commission, body
or other authority exercising or entitled to exercise any administrative, executive, judicial,
legislative, policy, regulatory or taxing authority or power; or any court or governmental
Glossary of Terms -1-
Page 100
tribunal.
Interconnection Customer – White Oak Solar Energy, LLC.
Interconnection Facilities – The Interconnection Provider's Interconnection Facilities and
the Interconnection Customer's Interconnection Facilities. Collectively, Interconnection
Facilities include all facilities and equipment between the Small Generating Facility and the
Point of Interconnection, including any modification, additions or upgrades that are
necessary to physically and electrically interconnect the Small Generating Facility to the
Interconnection Provider's Distribution System. Interconnection Facilities are sole use
facilities and shall not include Distribution Upgrades or Network Upgrades.
Interconnection Provider – City of Dover Municipal Electric Department on behalf of the
City of Dover, Delaware.
Interconnection Request – The Interconnection Customer's request, in accordance with
Interconnection Provider’s procedures, to interconnect a new Small Generating Facility, or to
increase the capacity of, or make a Material Modification to the operating characteristics of,
an existing Small Generating Facility that is interconnected with the Interconnection
Provider’s Distribution System.
Material Modification – A modification that has a material impact on the cost or timing of
any Interconnection Request with a later queue priority date.
Network Upgrades – Additions, modifications, and upgrades to the Interconnection
Provider's Distribution System required at or beyond the point at which the Small Generating
Facility interconnects with the Interconnection Provider’s Distribution System to
accommodate the interconnection of the Small Generating Facility with the Interconnection
Provider’s Distribution System. Network Upgrades do not include Distribution Upgrades.
Operating Requirements – Any operating and technical requirements that may be
applicable due to Regional Transmission Organization, Independent System Operator,
control area, or the Interconnection Provider's requirements, including those set forth in the
Small Generator Interconnection Agreement.
Party or Parties – The Interconnection Provider, and/or Interconnection Customer.
Point of Interconnection – The point where the Interconnection Facilities connect with the
Interconnection Provider's Distribution System.
PJM means PJM Interconnection, LLC, or any successor organization thereto.
Reasonable Efforts – With respect to an action required to be attempted or taken by a Party
under the Small Generator Interconnection Agreement, efforts that are timely and consistent
with Good Utility Practice and are otherwise substantially equivalent to those a Party would
Glossary of Terms -2-
Page 101
use to protect its own interests.
Small Generating Facility – The Interconnection Customer's device for the production of
electricity identified in the Interconnection Request, but shall not include the Interconnection
Customer's Interconnection Facilities.
Tariff – The Interconnection Provider or Affected System's Tariff through which
Interconnection Service is offered, as amended or supplemented from time to time, or any
successor tariff.
Upgrades – The required additions and modifications to the Interconnection Provider's
Distribution System at or beyond the Point of Interconnection. Upgrades may be Network
Upgrades or Distribution Upgrades. Upgrades do not include Interconnection Facilities.
Glossary of Terms -3-
Page 102
Attachment 2
Description and Costs of the
Interconnection Facilities and Metering Equipment
Interconnection Customer’s Interconnection Facilities:
Description Section Reference in
Technical
Requirements
69 kV Interface Transformer G
Fiber Optic Interface K.2
Fiber Patch/Splice Panel K.2, K.3
Conduit for fiber optic cable and power and control circuits K.4
Metering Equipment (GE KV2 C+ or similar) L
RTU – Siemens Station Manager 2 in NEMA 2 enclosure M
Recording equipment N
69 kV Breaker and protective relays P
Interconnection Provider’s Interconnection Facilities:
Description Cost Estimate
None
Attachment 5 - Technical Requirements -4-
White Oak Solar Energy, LLC 10 MW
Page 103
Attachment 3
One-line Diagram Depicting the Small Generating Facility, Interconnection
Facilities, Metering Equipment, and Upgrades
Typical One-Line Diagram
Attachment 5 - Technical Requirements -5-
White Oak Solar Energy, LLC 10 MW
Page 104
Attachment 4
Milestones
In-Service Date: 12/31/2010
Critical milestones and responsibility as agreed to by the Parties:
Milestone Date Responsible Party
(1) Small Generating Facility Site Plan Approval by 4/30/2010 IC
Dover Planning Commission
(2) Financial Security Posting (pursuant to article 6.3 of 4/30/2010 IC
IA)
(3) Specifications for the IP’s Interconnection Facilities 5/31/2010 IP
and Distribution Upgrades major equipment to be
procured by IC
(4) Notice to Proceed issued to EPC Contractor for Small 6/30/2010 IC
Generating Facility
(5) Major equipment ordered for Distribution Upgrades 7/15/2010 IC
(6) Major equipment ordered by IC for IP Interconnection 10/15/2010 IC
Facilities and Distribution Upgrades delivered and turned
over to IP
(7) IP commences construction of IP’s Interconnection 10/20/2010 IP
Facilities and Distribution Upgrades
(8) Completion of IP’s Interconnection Facilities and 11/15/2010 IP
Distribution Upgrades
(9) Commissioning/Testing of Small Generating Facility 12/1/2010 IC
(10) Commercial Operations Date of Small Generating 12/31/2010 IC
Facility
IC = Interconnection Customer, IP = Interconnection Provider
Agreed to by:
For the Interconnection Provider: Date:
For the Interconnection Customer: Date:
Attachment 5 - Technical Requirements -6-
White Oak Solar Energy, LLC 10 MW
Page 105
Attachment 5
Technical Requirements for Interconnection of White Oak Solar Energy, LLC 10
MW Photovoltaic Plant to the City of Dover Electric Transmission System
A. General
1) This Technical Considerations Document describes the minimum design requirements and operating
procedures necessary for the safe and effective interconnection of parallel Customer owned generation.
The Generator Owner’s design must meet or exceed the requirements outlined in these Technical
Considerations and also meet any applicable Tariff requirements. Some aspects of the Generator owner’s
design and operation may also be required to meet PJM, MAAC and NERC requirements.
2) The Customer’s generation Facility must meet all applicable national, state and local construction,
safety and electrical codes. City approval to interconnect indicates only that the minimum requirements
for parallel operation outlined in this document have been satisfied. Such approval does not imply that the
generator Owner‘s Facility meets all federal, state and local standards and regulations.
3) All equipment, circuit breakers and other current interrupting devices at the Generator Owner’s Facility
must be capable of interrupting the maximum available fault current at the site including any contribution
from the Facility’s generator. Fault current contributions from the City of Dover Electric Transmission
System at the proposed point of interconnection are detailed under the heading “System Information at
Point of Interconnection”.
4) All equipment and insulation must be capable of continuous operation at the specified voltage ratings
at the Point of Interconnection. Voltage ratings for the City of Dover Electric Transmission System at the
proposed point of interconnection are detailed under the heading “System Information at Point of
Interconnection”.
5) The three-way switch will be the isolation point for both parties; however, the Generation Owner may
elect to install additional disconnect switches within the interconnection substation.
6) This agreement is only for the interconnection to the Transmission System, station service information
and requirements are addressed in the Electric Service Handbook.
7) The three-way motor operated disconnect switch and pole required to interconnect the Generation
Owner and City of Dover transmission line will be specified, purchased, installed and owned by the City of
Dover. All expenses related to this installation/modification shall be the financial responsibility of the
Generation Owner.
8) All expenses incurred by the City of Dover for staff, contractors, consultants and engineering services
related to the installation of the interconnection facility will be reimbursed to the City of Dover. For
example these expenses could be related to design, reviews, installation, and commissioning, to name a
few.
B. Definitions
Various terms as utilized in this document are defined below. Whenever used in the document with initial
capitalization, the following terms have the meanings specified in this Section.
City – The City of Dover, Delaware.
City of Dover Electric Transmission System – The electric transmission system belonging to the City of
Dover, Delaware, typically operating at a voltage of 69kV.
Attachment 5 - Technical Requirements -7-
White Oak Solar Energy, LLC 10 MW
Page 106
Customer - Any adult person, partnership, association, corporation, or other entity: (i) in whose name a
service account is listed, (ii) who occupies or is the ratepayer for a premises, building, structure, etc., and
(iii) who is primarily responsible for payment of bills. Multiple premises or sites under the same name are
considered multiple Customers.
Interface Transformer - A transformer which interconnects a privately owned generation source with the
City of Dover Electric Transmission System.
Facility (or Facilities) (or Generator) – The Customer owned generating equipment and all associated or
ancillary equipment, including Interconnection Equipment, on the Customer’s side of the Point of
Interconnection.
Generator Owner – The owner of the Facility that is interconnected to the City.
Grid – The interconnected arrangement of lines, transformers and generators including, but not limited to,
those that make up the City of Dover Electric Transmission System.
Interconnection – The physical connection of Customer owned generation to the City of Dover Electric
Transmission System in accordance with these technical considerations so that parallel operation can
occur.
Interconnection Equipment - That equipment necessary to interconnect the Facility to the City of Dover
Electric Transmission System, including any and all relaying, interrupting, metering or communication
equipment needed to protect the Facility and the City of Dover Electric Transmission System and to
control and safely operate the Facility in parallel with the City of Dover Electric Transmission System.
Inverter – A static power converter with control, protection and filtering functions that converts Direct
Current (DC) input to Alternating Current (AC) output. Inverters connected to the City of Dover Electric
Transmission System must be of the non-islanding type.
Island – A portion of the City of Dover Electric Transmission System containing both load and Customer
owned generation that is electrically isolated from the remainder of the City of Dover Electric
Transmission System.
MAAC -Mid-Atlantic Area Council. One of ten Regional Reliability Councils which form the North
American Electric Reliability Council (NERC). MAAC is responsible for the mid-Atlantic region, including
all or parts of the states of Pennsylvania, New Jersey, Delaware, Maryland, Virginia and the District of
Columbia.
NERC -North American Electric Reliability Council. The purpose of NERC is to ensure the adequacy,
reliability and security of the bulk electric supply systems through coordinated operations and planning of
generation and transmission facilities.
Parallel Operation – Any electrical connection between the City of Dover Electric Transmission System
and the Generator Owner’s generation source.
PJM - PJM Interconnection, L.L.C. The Independent System Operator for the Pennsylvania, New Jersey
Maryland area of the Northeast U.S. whose members include electric utilities and independently owned
generating resources. The organization is responsible for dispatching generation, operating the bulk
transmission system within its service area and operating a buy/sell market for member’s generation.
Point of Interconnection – Also known as the Point of Common Coupling (or PCC). The point where the
electrical conductors of the City of Dover Electric Transmission System are connected to the Generator
Owner’s conductors and where any transfer of electric power between the Customer and the City of
Dover Electric Transmission System takes place.
RTU - Remote Terminal Unit. The remote unit of a supervisory control system used to telemeter operating
data, provide device status/alarms and to provide remote control of equipment at a substation or
generator site. The unit communicates with a master unit at the System Control Center.
Stabilized – The state of the City’s system following a disturbance which returns to the normal range of
voltage and frequency for approximately 5 seconds or longer as determined by the City. The City may
require a longer time period if necessary to ensure the safety and reliability of the City of Dover Electric
Transmission System.
System Control Center – The City office that monitors and has direct control over the operation of the City
of Dover Electric Transmission System.
System Emergency – An imminent or occurring condition on the City of Dover Electric Transmission
System, the PJM System, the system of a neighboring utility, or in the Facility, that is likely to impair
system reliability, quality of service, or result in significant disruption of service, or damage, to any of the
foregoing, or is likely to endanger life, property or the environment.
Transmission System – The City of Dover 69kv distribution circuit(s) and associated poles, conductors,
insulators, and related equipment.
Attachment 5 - Technical Requirements -8-
White Oak Solar Energy, LLC 10 MW
Page 107
C. Background Information and Need for Protection
1) The City of Dover Electric Transmission System is subject to a variety of natural and man-made
hazards. Among these are lightning, wind, snow, animals, vehicular accidents, vandalism and human
error. These same hazards are present in residential and commercial electric systems but to a lesser
degree due to the smaller size and protected environment of these systems.
2) The electric problems that can result from the preceding hazards are principally short circuits,
grounded conductors and broken or open conductors. All of these problems require that the affected
equipment be de-energized as quickly as possible to minimize equipment damage, to protect Grid
security, to lessen the adverse impact on Customers and to remove any hazard to the public and City
personnel.
3) The Generator Owner has the responsibility to protect both his own Facility and the impact of his
Facility on the Grid.
D. Basic Protection Goals
The protection system at the Point of Interconnection should be designed and operated with the
following desired goals in mind:
1) Protect the City of Dover Electric Transmission System from the adverse impacts of the parallel
generator.
2) Protect the parallel generator from faults or other disturbances in the City of Dover Electric
Transmission System.
3) Disconnect the parallel generator from the City of Dover Electric Transmission System for
abnormal operating conditions.
4) Permit the desired range of power transfer without false operation.
E. Protection General Requirements
1) The generator and Point of Interconnection protection schemes shall be continuously monitored
and in a functional state. The generator shall immediately be disconnected from the City of Dover
Electric Transmission System for any condition that would make the protection scheme inoperable.
2) The operating power for the generator and Point of Interconnection protection schemes and the
control power used to disconnect the generator from the City of Dover Electric Transmission System
must not be directly dependent on City of Dover Electric Transmission System power.
3) The generator protection shall be designed to automatically and immediately disconnect the
generator from the City of Dover Electric Transmission System if the source circuit from the City is
lost, irrespective of connected loads or other generators on the circuit.
4) The generator shall be equipped with protective equipment (hardware or software) to prevent the
generator from energizing a de-energized City of Dover Electric Transmission circuit.
5) Parallel operation must cease immediately and automatically for abnormal operating voltage,
frequency, harmonic content or power flow. Parallel operation must also cease for loss of a phase or
improper phase sequence. Voltage sensing shall be performed on all three phases.
6) Protection at the Point of Interconnection must detect and isolate the Facility from the City of Dover
Page 108
Electric Transmission System for a fault condition in the Generation Owner’s Facility.
7) Protection at the Point of Interconnection must detect and isolate from the City of Dover Electric
Transmission System the Generation Owner’s Facility for a fault condition on the City of Dover
Electric Transmission System circuit that supplies the generator site.
8) The protection scheme should permit the desired range of power transfer without false operation.
The protection scheme should also prevent excessive or unnecessary tripping that would adversely
affect the City’s service reliability to other Customers or Generator Owners.
9) The generator protection or protection at the Point of Interconnection must insure that the
generator is disconnected from the City of Dover Electric Transmission System before any automatic
re-energizing of the City of Dover Electric Transmission System supply circuit.
10) The protection at the Facility must recognize and disconnect the Generator from the City of Dover
Electric Transmission System if the generator is islanded with other Customer load.
11) Any automatic re-connection of the generator to the Grid following a loss and subsequent
restoration of the City of Dover Electric Transmission System source must occur only after the City of
Dover Electric Transmission System has stabilized.
Note: This preceding list of design requirements is not intended to be all-inclusive. Other hazards and
conditions may need to be taken into consideration by the design engineer based upon the
circumstances, the specific site, the Generation Owner’s needs and other appropriate criteria.
F. Grid Interconnection Point Information
1) The proposed 10MW Solar Photovoltaic Generation Facility is to be located in the northern portion
of the Garrison Tract located on the north side of White Oak Road and east of US Highway 1, in the
City of Dover, Kent County, Delaware. This places the proposed 69 kV tap (new 3-way switch and
pole) on the Cartanza – Dover Downs 69kV Line approximately halfway between Cartanza
Substation and Dover Downs Substation. This Cartanza-Dover Downs line is also referred to as line
9080. From the new 69 kV tap, approximately ½ mile of aboveground 69 kV line will be built to the
Facility’s substation. The actual physical Point of Interconnection is defined as the 69 kV line
conductor tail (the portion of the conductor that extends through the dead-end shoe), excluding the
connector, located on the Facility installed dead-end structure at the interconnection substation. .
The Facility will own the connection, and hardware connecting the Facility to the conductor tail. Some
details on the City of Dover Electric Transmission System are noted below to assist the Generator
Owner in the design of their Facility.
The City of Dover Electric Transmission System consists of multiple 69kV circuits, substations, local
generation, and a 230kV interconnection to Delmarva Power and Light. The System is solidly
grounded wye at the larger generators and at the 230kV interconnection.
System Information at Point of Interconnection:
Type 3 Phase, 60 Hz AC, Solidly grounded wye
Nominal Operating Voltage 69,000 Volts Phase-Phase
Maximum Operating Voltage 72,500 Volts Phase-Phase
Basic Impulse Level 350kV
Surge Arrester Rating 42kV MCOV
Max Available Fault Current 15,241 Amps 3 Phase (with no Solar Farm contribution)
9,880 Amps Phase-Gnd (with no Solar Farm contribution)
2) Most distribution and transmission lines have automatic line restoration following a line trip. The
Page 109
majority of faults (short circuits) are temporary in nature such as a flashed insulator or a tree limb that
brushed against a line. Once the fault has been detected and the affected circuit de-energized, the
circuit can normally be successfully re-energized. This re-energization or automatic reclose could
occur after the line has been dead for 0.20 second, up to a minute or more. The net result of
automatic line restoration is to restore the integrity of the Grid and to reduce any Customer outage
time. The Generator Owner will have to take into account the impact of automatic circuit restoration in
the design and operation of their Facility.
3) The Generator Owner may request the City to delay any high speed reclosing on the City of Dover
Electric Transmission System supply circuit to allow the Parallel Operation generator sufficient time to
remove itself from an islanded or de-energized circuit prior to automatic reclose. Since delaying the
automatic reclose time degrades the level of service to other Customers on the circuit, the City may
limit any delay of the automatic reclose to a few seconds or less. Alternatively, the Generator Owner
may request that a direct transfer trip scheme be added to remove the interconnected generator from
service prior to automatic reclosing by using communication equipment between the Generator
Owner’s site and the City. Similarly, the Generator Owner may request that a synchronizing check or
reclose-blocking scheme be installed on the City’s source circuit to prevent out of phase reclosing.
The Generator owner is responsible for all costs associated with the installation and maintenance of
these requested modifications.
G. Interface Transformer
1) In most cases, an Interface Transformer will be required to interconnect the Generator Owner’s
Facility to the City of Dover Electric Transmission System voltage. In addition to matching the proper
voltage level, this Interface Transformer will decrease possible voltage variations seen by other City
Customers, attenuate any possible harmonics and reduces the effects of fault currents.
2) The proposed 10MW Solar Photovoltaic Generation Facility Interface Transformer should be
configured for nominal 69kV operation with a de-energized tap changer ranging from -5% to +5% of
nominal in 2.5% steps. The transformer should be connected in Delta on the 69kV winding. A
special zero-sequence/over/under voltage detection scheme will be required for this configuration
(see details under heading “Protection Scheme Details”). The Transformer must be sized to support
maximum anticipated power transfers to and from the City of Dover Electric Transmission System.
H. Power Quality Considerations
1) The Generator Owner’s Facility shall be designed and operated in such a manner that there are no
noticeable adverse impacts to system voltage, frequency, harmonics etc.
2) The parallel generator shall not cause excessive voltage flicker on the City of Dover Electric
Transmission System. (Voltage flicker is defined as variations in system voltage magnitude and
duration sufficient to allow visual observation of a change in electric light source intensity.) Any flicker
shall not exceed the “Borderline of Irritation” Curve, Fig. 10.3, as defined in IEEE Std. 519-1992,
Recommended Practices and Requirements for Harmonic Control in Electric Power Systems. The
City reserves the right to require tighter flicker control in situations where other Customer’s equipment
or operations (computers, instrumentation, process controls, etc.) are impacted.
3) The parallel generator could introduce harmonics distortion into the City of Dover Electric
Transmission System if equipment such as DC to AC inverters are used in the Facility. (Harmonic
distortion is defined as continuous distortion of the normal 60 Hz. sine wave typically caused by
nonlinear loads or by inverters, measured in total harmonic distortion, THD.) Any voltage harmonic
distortion shall not exceed the limitation as defined in IEEE Std. 519-1992, Recommended Practices
and Requirements for Harmonic Control in Electric Power Systems, Table 11.1. The limits vary
dependent on the voltage. In addition, the level of harmonic current that the Generator Owner shall
Page 110
inject into the City of Dover Electric Transmission System should not exceed the level specified in
Table 10.3 in IEEE Std. 519-1992.
4) Any DC to AC inverter should not inject DC current greater that 0.5% of the rated inverter capacity
into the Point of Interconnection during both normal and abnormal operation.
I. Power Factor Considerations
1) A parallel generator shall not adversely impact the power factor of the City of Dover Electric
Transmission System at or near the Point of Interconnection. The generator type impacts the power
factor. The inverters of most DC generators are designed to operate close to unity power factor.
Induction generators absorb VARs from the City of Dover Electric Transmission System.
Synchronous generators can either absorb or produce VARs thus having a varying power factor
depending upon excitation control.
2) The City of Dover Electric Transmission System requires that the power factor of the Facility at the
point of Interconnection be maintained in the range of 98.5% lagging to 98.5% leading.
J. Inverter Considerations
1) The Generator Owner must use a non-islanding type inverter as defined in IEEE 929 2000, IEEE
Recommended Practices for Utility Interface of Photovoltaic (PV) Systems.
2) Non-islanding type inverters are inherently designed to automatically disconnect from the Grid if
the Generator Owner’s site becomes isolated from the City of Dover Electric Transmission System.
This type inverter also prevents the Generator owner from inadvertently supplying other City
Customers in an isolated Island situation.
3) The inverter output specifications must meet the power quality considerations detailed under
heading “Power Quality Considerations”.
K. Communication Facilities Considerations
1) The City will provide and install optical fiber for data communication purposes. The city will install
a 48 fiber count ADSS splice case near the location of the existing fiber. The City will install a 24
strand ADSS fiber optic cable from this splice case to a 24 strand patch panel with ST connections
provided by Generation owner at the substation. The Generation Owner will incorporate this
communication system during design and construction. Additional fiber will be required at the
Dover Downs substation. The city will install a 48 ADSS fiber strand cable from DuPont Hwy to the
Dover Downs substation. The existing 24 strand patch panel will be replaced with a 48 strand patch
panel to incorporate the pilot wire relaying. All cost of this installation incurred by the City will be
paid by Generation Owner.
a. No voice circuits will be provided and this data communication will be limited to City of
Dover facilities only. No interconnection with other voice/data sources will be allowed.
2) The Facility shall provide the following equipment:
Fiber Optic Interface RFL IMUX 2000 Mini-DACS, Model 2000CCM with 1300NM single
mode fiber optic interface
Fiber Patch/Splice Panel Corning Cable Systems – Qty 1 Closet connector
housing Part # CCH-02U; Qty 4 Closet connector
Page 111
housing panels Part # CCH-CP06-19T; Qty 4
Buffer tube fan-out kits Part # FAN-BT25-06; Qty 2
Buffer tube fan-out kits Part # FAN-BT25-12
Qty 26 Anaerobic-Cure connectors Part # 95-201-52-SP
3) RFL IMUX 2000, fiber patch and splice panel and accessories and commissioning services after
final installation is complete, must be purchased from:
RFL Electronics Inc.
353 Powerville Road
Boonton Twp., NJ 07005-9151
IMUX 2000, Fiber Patch and Splice Panel and accessories:
Attention: Mike Reinhold
Email: Mike.Reinhold@rflelect.com
Phone: (973) 334-3100 Ext. 239 – Fax: (973) 334-3863
Reference: IMUX 2000 New Node
Quotation No: CQ-51457-A
Commissioning Services:
Attention: Marko Stieber
Email: Marko.Stieber@rflelect.com
Phone: (973) 334-3100 Ext. 211 – Fax: (973) 334-3863
Reference: RFL IMUX 2000/ILS Commissioning Adding a new
ILS/MUX Node
Quotation No: CQ-52458
4) The following items will be supplied by the facility:
a) Conduit from interconnection substation to riser pole for the fiber optic cable;
b) Conduits for the power and control circuits for the 3-way motor operated disconnect
switches including materials and installation of the appropriate controls, cabling and
circuits; and
c) Exact number and sizing to be determined during design.
L. Interval (Revenue) Metering Considerations
1) All paralleled generator Facilities shall be metered in accordance with applicable tariffs and
specifications provided in approved City publications or other contractual documents related to this
project as appropriate. As a minimum, the following interval data is required:
a) MWhr and MVARhr Input/Output at the Point of Interconnection
2) The Facility shall provide, at a minimum, the following metering equipment:
a) The City of Dover would prefer that a GE KV2 C+ be installed in this application.
b) The Facility shall provide the RS-232 connection from the meter to the RFL IMUX.
3) Interval Data requires the Generator Owner to supply communication facilities which allows the
City to retrieve the interval data remotely. Specific requirements will be determined on a case-by-case
basis.
4) All metering equipment will be owned and maintained by the Generation Owner.
5) Unless otherwise mutually agreed upon by the City and the Generator Owner, the Generation
Page 112
Owner shall have ownership of the equipment and supply all inspection, reading, maintenance and
testing of all metering equipment for the Generator Owner’s Facility, at the Generator Owner's cost.
The Generator Owner shall install the metering PTs (potential transformers) and CTs (current
transformers) on the 69kv side of the transformer.
6) Revenue metering combined current transformer (CT) and potential transformer (PT) units shall
have the following minimum specifications; however, the final design and potential light load of the
Generator Owner’s equipment during non-generation hours may require modification to this
specification:
Type Metering CT
Ratio 100/5
Accuracy Class 0.3 B1.8
Type Inductive PT
Ratio 40,250 – 115/67.08 Volts
Accuracy/Burden 0.3 O,W,X,M,Y,Z,ZZ
7) The City shall require interval metering of the generator output to the extent reasonably necessary
to provide the City with the data needed to administer its tariffs and to operate and plan the City of
Dover Electric Transmission System.
8) The Point of Interconnection interval metering shall be bi-directional so that power deliveries to and
from the Generator Owner’s site can be separately recorded. The Point of Interconnection metering
shall not be equipped with detents.
9) The Generator Owner may, at its sole option and cost, install or request to have the City install
additional metering equipment to meet any special needs that the Generator Owner may have.
M. Monitoring and Control Considerations
1) The Generator Owner shall purchase and install a Remote Terminal Unit (RTU) per the
specifications below to enable the City to monitor the status of the data points listed in below at the
Generator Owner’s site and to control certain breakers, if required. This RTU shall utilize DNP 3.0
protocol, or other such protocol compatible with the existing Supervisory Control System at the City.
Siemens 5700 Station Manager 2 mounted in NEMA 2 enclosure
RTU must be purchased from:
Siemens Energy Management and Automation
7000 Siemens Road
Wendell, NC 27591
Attention: Kelly Roberson
Email: kelly.roberson@siemens.com
Phone: (877) 217-4943 – Fax: (877) 217-4945
Reference: TG5700 RTU
Quotation No:?
Seller to contact above for further details on the RTU.
2) The following SCADA points shall be provided to the City:
Indication:
1: 69kV GCB Loss of DC Control Power
Page 113
2: 69kV GCB Breaker Status
3: 69kV GCB Discharged Spring Alarm
4: 69kV GCB Low SF6 Pressure
5: 69kV GCB Breaker In Local
6: 69kV GCB Breaker Lockout
7: 69kV Relays Common Alarm
8: Transformer information as appropriate and agreed upon by both parties
Control:
1. Breaker Control (trip & close) – 69kV Breaker
2. Individual control for MOD switches located on 3-way switch pole.
Analog:
1. 69kV Instantaneous MW
2. 69kV Instantaneous MVAR
3. 69kV MW-hrs
4. 69kV MVAR-hrs
5. 69kV A ph Amps
6. 69kV B ph Amps
7. 69kV C ph Amps
8. 69kV A ph Volts
9. 69kV B ph Volts
10. 69kV C ph Volts
RS-485:
1. All 69kV Relays
2. All 69kV Power Meters
3) City personnel shall be responsible for programming the RTU and Master Station. All costs will be
borne by the Generation Owner.
N. Event Recording Considerations
1) The Generator Owner shall purchase and install recording equipment to monitor the performance
of their protection and control equipment for those parallel generator sites interconnected with the
City of Dover Electric Transmission System.
2) The City reserves the right to specify the voltages, currents, device status, etc. to be monitored and
recorded by this event recording equipment. At a minimum, these are:
1. 69kV Amps
2. 69kV Volts
3. 69kV Breaker and Alarm Statuses
3) Event information may be recorded by features internal to microprocessor type protective relays,
by separate digital fault/event recorders or by a combination of these two methods.
4) The City shall have remote access to any recorded information for use in analyzing the
performance of the overall Electric System.
5) The Generator Owner will supply communication facilities for the event recording equipment for
remote access of the data and this data shall be sent to a SEL 2030. SEL 2030 shall be provided by
Generation owner, connected to the IMUX, and required inputs will be determined by the City during
design.
Page 114
6) Digital fault recording equipment should be time synchronized to a reference traceable to the
National Institute of Standards and Technology.
O. Performance Considerations
1) The interconnection of parallel generation with the City of Dover Electric Transmission System is
permissible only if the system voltage, frequency and current flow at the Point of Interconnection are
within normal limits. Parallel operation must cease immediately and automatically for abnormal
voltage, frequency, or current flow as defined below.
2) Parallel operation must also cease automatically for operation outside the power quality limitations
detailed in Technical Design Considerations, Section VIII - G.
3) The Generator Owner’s equipment shall be operated in such a manner that the voltage levels on
the City’s Grid remain within the operating limits defined by ANSI C84.1.
4) The generator must immediately and automatically cease parallel operation and disconnect from
the City of Dover Electric Transmission System if the voltage at the Point of Interconnection exceeds
the limits defined below:
DC Generating Systems with Non-Islanding Inverters
a) Trip in 0.1 Second for V < 50%
b) Trip within 0.1 to 30 Seconds for 50% = V < 88%
c) Trip within 0.1 to 30 Seconds for 106% < V < 137%
d) Trip in 0.03 Second for 137% = V (Specific voltage and time delay set points will be
determined for each generator installation)
Notes:
a) Trip time refers to the time between when the abnormal voltage condition occurs and the
generator being disconnected from the City of Dover Electric Transmission System.
b) Three-phase voltage sensing shall be used.
5) The Generator may reconnect automatically to the Grid after a 60 seconds has elapsed if both the
system voltage has returned to normal range and the Grid is stabilized..
6) The generator must immediately and automatically cease parallel operation and disconnect from
the City of Dover Electric Transmission System if the operating frequency exceeds the limits defined
below:
DC Generating Systems with Non-Islanding Inverters
a) Trip in 0.1 Second for F < 59.3 Hz.
b) Trip in 0.1 Second for F > 60.5 Hz. (Set points taken from IEEE Std. 929.)
8) The inverters of DC generating systems shall obtain their commutation reference from the City of
Dover Electric Transmission System and thus synchronization will not be an issue.
9) The generator must automatically and immediately disconnect from the City of Dover Electric
Transmission System if the source from the Grid is lost. This separation must occur irrespective of
connected load or other generators on the circuit.
10) The generator must be disconnected from the City of Dover Electric Transmission System before
any automatic reclose or re-energization of the City source.
11) For a fault condition on the City source circuit that interconnects with the Generator Owner’s
Facility, the Generator Owner must have protective relaying to detect this condition and disconnect
Page 115
the generator from the Grid. The required operating time of the protection scheme is dependent on
many variables such as voltage class, generator stability concerns, primary vs. backup relaying,
coordination requirements with City relaying scheme, etc. The City will work with the Generator
Owner and ascertain the performance requirements on a case by case basis.
12) In cases where clearing time from the Generator Site is critical, transfer trip from the City end of
the circuit to the Generator Owner’s site may be required.
13) For a fault condition within the Generator Owner’s Facility, the Generator Owner must have
protective relaying to detect and isolate the fault from the City of Dover Electric Transmission System.
The required clearing time of the Facility’s protection schemes is dependent on many variables such
as voltage class and the operating time of any City protection schemes that reach into the Facility.
The City will review the proposed operating time of the Facility’s protection schemes and ascertain
the performance requirements on a case by case basis.
P. Protection Scheme Details
1) Protective relays shall be microprocessor type with integral trip record and fault recording, self-
checking and remote communications. Remote communications should be provided through a digital
switching device to allow a single communication line to service multiple protective 69kv relays.
2) All protective relays must have the desired sensitivity and speed for its intended application and be
of utility grade. The City can provide feedback to the Generator Owner in this regard.
3) All equipment, lines and busses operating at 69kV shall be protected by two independent
protective schemes.
4) Primary and backup protection schemes shall be supplied via independent current/potential circuits
and independently protected DC control circuits. Potential circuits will be considered independent if
they emanate from different windings from the same potential transformer.
5) DC circuits supplying protective relaying schemes shall be continuously monitored and fused
separately from any other DC control circuits. Loss of any control power bus including DC trip and
close busses of each breaker shall also be monitored and alarmed to a manned location so that
corrective action can be taken. Relay failure alarms shall be handled in a similar manner. See section
M. Monitoring and Control Considerations for duplicate alarms that are required by Dover.
6) All protective relay systems, equipment, design, operation and maintenance shall be in accordance
with all applicable Federal, State and Local requirements, National and Regional Reliability Criteria
and Industry Recognized Standards and Guidelines.
7) Primary 69kV line protection shall be provided by a SEL-311L line differential relay. This will
communicate via optical fiber to both remote line end relays (at Carranza and Dover Downs) to form a
3-terminal line differential scheme. On-board transfer trip capabilities will be used to enable tripping
of the local 69kV and intermediate voltage breakers (e.g. 12 or 34.5 kV, based on the final Facility
design) breakers despite the weak infeed inherent with an inverter source.
8) Additional weak infeed protection shall be provided by a logical “and” condition when both remote
line end breakers are open. “b” contact status from both of these breakers will be provided via the
communications capabilities onboard the SEL-311L scheme to trip the local 69kV and intermediate
voltage breakers when both line ends are open. This will help protect against an islanding condition
and force synchronization back to the plant.
9) Local 69kV breaker and intermediate voltage breaker shall use auxiliary contacts such that the
intermediated voltage breaker will trip and be inhibited from closing whenever the 69kV breaker is
Page 116
open.
10) Backup line protection shall be provided by a SEL-351 relay. Logic inside the relay will be
configured to provide undervoltage protection, overvoltage protection, and zero-sequence voltage
protection.
11) Transformer protection shall be provided by a transformer differential relay and a separate
overcurrent relay. SEL-587 and SEL-551 relays are recommended. Fault pressure relay protection
should also be provided.
12) Local 69kV breaker closing shall be supervised by a Hot Line Dead Bus (Dead Customer)
scheme.
13) Bushing Current transformers (CTs) used for protective relaying on the 69kV side should have the
following minimum specifications:
Type Multi-ratio bushing CT
Ratio 1200/5
Accuracy Class C800
14) Potential Transformers (PTs) used for protective relaying on the 69kV side should have the
following minimum specifications:
Type CCVT dual winding
Ratio 40,250 – 115/67.08 Volts
Accuracy/Burden 0.6 MWXYZ 200 VA
15) 69kV Breaker Minimum Specifications are below. A Siemens type SP2 is recommended to
maintain consistency with the City of Dover Electric Transmission System.
Rated Maximum Voltage 72.5 kV
Rated Continuous Current 1200 A
Frequency 60 HZ
Rated Short Circuit Current 40 kA
Full Wave Impulse Withstand 350 kV
Rated Interrupting Time 3.0 cycles
16) Line Protection relay settings will be provided by the City of Dover prior to commissioning.
Transformer and bus relay/differential settings will be the responsibility of the Generation Owner;
however, the City of Dover will be provided the settings and they may review these settings to
evaluate any potential impact on the transmission system.
Q. Maintenance requirements
1) Proper maintenance of electrical equipment is important to ensure a safe and reliable electrical
system.
2) Electrical equipment in the Interconnect substation should be maintained, at a minimum, per the
requirements in the latest edition of ANSI/NETA MTS-XXXX, including appendix B “frequency of
Maintenance Tests”. The current edition is ANSI/NETA MTS-2007. Generation owner will provide
the City of Dover a detailed 5-year maintenance schedule prior to facility commissioning and will
update annually.
3) Revenue Metering Maintenance – will be performed by the Generation Owner.
R. City of Dover Approvals
1) All designs and components of the 69kv system shall be approved by the City of Dover prior
to purchase/installation.
Page 117
2) The City of Dover shall approve all third-party testing company(ies) prior to the
commencement of work on any component/system related to the 69kv equipment. Such
approval shall not be unreasonably withheld.
3) Commissioning tests will require an outage on the interconnection line segment; Dover
reserves the right to mandate the days and times that this can be scheduled.
4) The Facility will develop a comprehensive commissioning test plan/procedure (plan) and
submit this to the City of Dover for approval at a minimum of 30 days prior to the work. Dover
will review and approve/disapprove this plan for any component/system that could directly
impact the 69kv system, such approval shall not be unreasonably withheld. The Facility will
be responsible for modifications to the plan until Dover accepts the plan. This shall be
completed prior to commissioning.
5) During Dover’s design review other considerations/concerns may require additional
components; Generator Owner will modify the Facility to incorporate these changes.
Page 118
S. Typical One-Line Diagram
Page 119
T. References
The references and standards listed below can provide technical requirements, support and
insight into the safe, reliable interconnection of parallel generation with the City of Dover
Electric Transmission system. It is suggested that those individuals and firms contemplating
operation of parallel generation with the City review these references for applicability to their
installation. This listing is not intended to be all-inclusive.
• IEEE C2, National Electric Safety Code® (NESC®)
• NFPA 70, National Electric Code® (NEC®)
• IEEE Std. 493-1997, IEEE Recommended Practice for Design of Reliable Industrial and
Commercial Power Systems (IEEE Gold Book)
• IEEE Std. 519-1992, IEEE Recommended Practice and Requirements for Harmonic
Control in Electric Power Systems
• IEEE Std. 242-1986, IEEE Recommended Practice for Protection and Coordination of
Industrial and Commercial Power Systems (IEEE Buff Book)
• ANSI Std. C84.1-1995, Electric Power Systems and Equipment – Voltage Ratings
• IEEE Std. 1159-1995, IEEE Recommended Practice for Monitoring Power Quality
• IEEE Std. 929-2000, IEEE Recommended Practice for Utility Interface of Photovoltaic
(PV) Systems
• ANSI/IEEE Std. C37.1-1994, Standard Definitions, Specifications and Analysis of Systems
Used for Supervisory Control, Data Acquisition and Automatic Control
• IEEE Std. C37.2-1991, IEEE Standard Electric Power System Device Function Numbers
• IEEE Std. C37.90-1989, Standard for Relays and Relay Systems Associated with Electric
Power Apparatus
• IEEE Std. C37.90.1-1989, Standard Surge Withstand Capability (SWC) Tests for Protective
Relays and Relay Systems
• IEEE Std. C37.91-1985 (Reaff 1990), Guide for Protective Relay Application to Power
Transformers
• IEEE Std. C37.93-1987, IEEE Guide for Power System Protective Relay Applications of
Audio Tones over Telephone Channels
• IEEE Std. C37.95-1989, IEEE Guide for Protective Relaying of Utility Consumer
Interconnections
• IEEE Std. C37.97-1979 (Reaff 1990), Guide to Protective Relay Applications to Power
System Buses
• IEEE Std. C37.101-1985, (Reaff 1990) Guide for Generator Ground Protection
• IEEE C37.102-1987, (Reaff 1990) Guide for AC Generator Protection
• IEEE C37.103-1990, Guide for Differential and Polarizing Relay Circuit Testing
• IEEE C37.106-1987, Guide for Abnormal Frequency Protection of Power Generating
Plants
• IEEE Std. C37.110-1996, Guide for the Application of Current Transformers Used for
Protective Relaying Purposes
• IEEE Std. C37.113-1999, Guide for Protective Relaying Applications to Transmission
Lines
• IEEE Std. C57.13.1-1981 (Reaff 1986) Guide to Field Testing of Relaying Current
Transformers
• IEEE Std. C57.13.2-1986 Standard Conformance Test Procedures for Instrument
Page 120
Transformers
• IEEE Std. C57.13.3-1983 (Reaff 1990) Guide for the Grounding of Instrument Transformer
Secondary Circuits and Cases
• IEEE Std. 100-1996, IEEE Standard Dictionary of Electrical and Electronics Terms
• IEEE Std. 141-1993, Recommended Practice for Electric Power Distribution for Industrial
Plants (IEEE Red Book)
• IEEE Std. 1001-1988, Guide for Interfacing Dispersed Storage and Generation Facilities
with Electric Utility Systems
• IEEE Std. 1021-1988, IEEE Recommended Practices for Utility Interconnection of Small
Wind Energy Conversion Systems
• IEEE Std. P1547 Draft, Standard for Distributed Resources Interconnected with Electric
Power Systems
• PJM Protective Relaying Philosophy and Design Standards
• PJM Relay Testing and Maintenance Practices
• PJM Transmission Substation and Line Design, Application and Maintenance Guidelines
• MAAC Protective Relaying Philosophy and Design Standards
• NERC Planning Standards
Page 121
Attachment 6
Interconnection Provider's Description of its Upgrades
and Best Estimate of Upgrade Costs
Distribution Upgrades:
Description Responsible Party for Cost Estimate
Design & Construction
69 kV line tap (3 way switch, steel pole, Interconnection $365,000
conductor, etc) Provider1
Approx. ½ mile of aboveground 69 kV Interconnection n/a
line from the 69 kV tap to A-frame Customer to build and
structure transfer ownership to
Interconnection Provider
Optical fiber installation at Dover Interconnection Provider $24,700
Downs
Optical fiber installation at Garrison Interconnection Provider $54,450
Tract
1
Interconnection Customer to procure major equipment based on Interconnection Provider’s design and
equipment specifications.
Network Upgrades:
None
Page 122
Attachment 7
Rate for Use of Interconnection Provider Distribution System
[Dover to insert rate or reference to a tariff here if applicable]
Page 123
ATTACHMENT #4
Utiility Committee Meeting of 1/25/2010
69 KV DELIVERY SERVICE CLASSIFICATION TO THE GRID
FOR WHITE OAK SOLAR ENERGY, LLC
AVAILABILITY
This tariff is available to the solar electric generating station owned by White Oak Solar Energy, LLC (“White
Oak”) to transmit up to 10 MW AC of associated energy from the Point of Interconnection as defined by the
Technical Requirements Exhibit to the Interconnection Agreement between White Oak Solar Energy, LLC and
the City of Dover (“City”)(“White Oak/Dover Interconnection Point”) to the point of interconnection that the City
maintains with Delmarva Power & Light (“DP&L”) pursuant to the Interconnection Agreement between DP&L
and the City of Dover, Delaware dated September 12, 2004 (“Dover/DP&L Interconnection Point”). The City
affirms and White Oak confirms that nothing in this tariff authorizes White Oak to make retail sales in the City’s
service territory. The service provided under the tariff shall be electrically isolated from any other electric
service, including retail supply provided to White Oak by the City under a different tariff. This tariff is available
to provide access to the City’s networked system only for delivery of up to 10 MW AC to the Dover/DP&L
Interconnection Point and is not available for service on other City non-networked facilities.
This tariff shall apply to White Oak when service under this tariff is requested by White Oak. To request
service, White Oak shall provide written notice to Dover no less than thirty (30) days prior to the date when it
requires service. The reservation term shall be one year, subject to renewal annually by giving written notice to
Dover no less than thirty (30) days prior to the expiration of the term.
CHARACTER OF SERVICE
The City is providing firm service on its networked system only under this tariff, which is normally operated as a
three phase, sixty cycle, alternating current system at a nominal voltage of sixty-nine thousand (69,000) volts,
line to line.
The parties expressly agree that the City shall have no responsibility to White Oak for securing any necessary
interconnection or other agreement(s) for the use of facilities beyond the City’s networked system, i.e., DP&L or
the PJM Interconnection, LLC.
The City shall own, operate, maintain and repair its system in accordance with Prudent Utility Practices. White
Oak shall operate its electric generating facilities and interconnection facilities in accordance with Prudent
Utility Practices. White Oak shall use the City’s networked system in accordance with Prudent Utility Practices.
The City shall have no obligation to expand the capacity of its system to accommodate this transaction or to
provide any new interconnection facilities of any kind, provided, however, that changes to the system or
interconnection requested and fully paid for by White Oak may be made by the City, subject to design, safety,
and system security considerations.
REACTIVE POWER AND VOLTAGE CONTROL
White Oak shall provide sufficient reactive capability and voltage control facilities to meet its reactive power
requirements and adequately maintain voltage levels and stability. White Oak shall provide sufficient facilities
to maintain a unity (1.0 per unit) power factor at the White Oak/Dover Interconnection Point, based upon
projected peak reactive demand measured at the Metering Point and subject to the criteria in the following
paragraph.
White Oak shall operate so as to maintain a power factor at the Metering Point that is comparable to the
average power factor that Dover maintains in its service area, but in no case shall the White Oak monthly peak
one-hour interval power factor fall below 98.5%. If White Oak fails to meet this power factor requirement,
Dover may install, at White Oak’s cost, capacitors or other equipment to maintain a unity power factor at the
White Oak/Dover Interconnection Point.
RATES
The rate for services hereunder shall be $0.23 per kW-month of service requested for up to 10,000 kW per
month, plus charges imposed for reactive power and voltage regulation as provided above, plus Line Losses,
commencing when service under this tariff is requested by White Oak. The monthly rate shall be set for a
one year period starting with the first day of the month for which this service is requested. The first and
Page 124
last month’s service shall be prorated on a daily basis whereby White Oak shall pay only for those
contiguous days for which the service is requested.
If White Oak exceeds the kW reservation of service requested in the notice, the rate for service shall be
$1.00 per kW-month for the month in which the reservation was exceeded.
LOSSES
Line Losses. White Oak shall bear responsibility for line losses from the White Oak/Dover Interconnection
Point to the Dover/DP&L Interconnection Point at the rate of 1%. Losses shall be taken by adjusting the
quantities at the White Oak/Dover Interconnection Point (Metering Point quantities net of Interconnection
Facilities Losses) and multiplying the kW and kWh quantities for purposes of reporting White Oak Generating
Station quantities to the PJM Interconnection, LLC and DP&L.
All revenue metering equipment, including the revenue meter, the metering CTs and VTs are owned by White
Oak. These quantities are compensated by the meter to incorporate the Line Losses that are a part of this tariff
such that the Solar Unit output quantities reported to DP&L and PJM at the DP&L/Dover Interconnection Point
are net of losses. White Oak shall provide pulse outputs for metering and adequate space for meters and/or
communications facilities to report on Solar Unit operations.
PURCHASE POWER ADJUSTMENT
This tariff shall not be subject to the Purchase Power Adjustment.
PUBLIC UTILITY TAX
In addition to the charges for this service classification, a surcharge will apply to recover any tax imposed by
governmental authority upon provision of transmission services for electricity.
RATE CHANGES
The rates stated may be adjusted from time to time by Dover to reflect changes in the cost of service provided
under this tariff.
RULES AND REGULATIONS/MUNICIPAL ORDINANCES
The General Rules and Regulations of the City of Dover for electric service which are published in the Dover
Electric Service Handbook shall apply to service rendered under this service classification.
OPERATING CONDITIONS
Service provided under this tariff requires the following additional conditions.
1. White Oak shall communicate and coordinate with the City system dispatch office at all times and
especially when the Solar Unit is dispatched, synchronized, operated, and released.
2. The City has an RTU for its SCADA system installed at the Solar Unit to receive real time generating
station net MW output information (analog transducer) at its dispatch center. This quantity is one of
the values used to produce a real time value for City of Dover net system load. Any changes in the
current SCADA system reporting methods or equipment required by DP&L, PJM, the City, or White
Oak, must be compatible with existing or new City of Dover SCADA requirements, DP&L, and PJM
requirements. The cost of such changes shall be paid by White Oak.
3. White Oak shall cooperate when emergency procedures are implemented by the PJM Interconnection,
LLC, or when required under the DP&L/Dover Interconnection Agreement.
4. Subject to the Interconnection Agreement between White Oak and Dover, the City shall have the right
to direct White Oak to reduce or increase the output of the Solar Unit, including the temporary
shutdown or start-up of the Solar Unit, as necessary for system emergencies and to preserve the
City’s system security and reliability, or for the City to perform maintenance, facilities construction or
system expansion, or any modification that requires facility outages. The City shall provide White Oak
reasonable notice of any such directive.
Page 125
LEGISLATIVE, FINANCE AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held on January 25, 2010, at
6:00 p.m. with Chairman McGlumphy presiding. Members present were Mr. Salters, Mr. Leary,
Mr. Shevock, and Dr. Jones. Members of Council present were Mrs. Williams, Mr. Hogan,
Mr. McGiffin, Mr. Ruane, Mr. Slavin (arrived at 6:53 p.m.), and Mrs. Russell (arrived at 6:53 p.m.). Mayor
Carey was also present.
AGENDA ADDITIONS/DELETIONS
Dr. Jones moved for approval of the agenda, seconded by Mr. Leary and unanimously carried.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of the Hiring Freeze
for Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review and
approval of the Legislative, Finance, and Administration Committee and City Council. It was
suggested that there be a “standing” agenda item to consider the filling of critical positions and, if
there are no positions to consider, the item could be removed.
Fire Chief’s Assistant
Mr. Sean Christiansen, Fire Chief, stated that the proposal is to create a new position entitled Fire
Chief's Assistant. He noted that the position was originally established as an Administrative
Assistant in 1993 and was occupied by Mrs. Pat Braun from that time until 2000 and was
subsequently held by Mr. Carter Knotts until his retirement in March 2009. Chief Christiansen noted
that Mr. Knotts was a dispatcher and he kept this title while in the position, although he assumed an
administrative role. He explained that the incumbent of the new position will work on a daily basis
with the Chief, supervise five (5) dispatchers, handle administrative and budgetary functions, and
perform other duties as assigned by the Fire Chief. He noted that the position is currently budgeted
at $23,000 for the remaining four (4) months of the fiscal year and for a salary range of $34,959 to
$54,960 for the following fiscal year.
In response to Dr. Jones, Chief Christiansen noted that the position would include some clerical
duties, many administrative functions that the Fire Chief would normally handle on a day-to-day
basis, and direct supervision, including scheduling and training, of the dispatchers. He stated that
the position was considered by the Human Resources Department to be a “super secretary”.
Mr. McGlumphy inquired if the previous position was under the Pay for Performance (PFP) plan and
if the new position would be. Chief Christiansen stated that it previously was not. Feeling that
Mr. Christiansen might not be familiar with the PFP, Mr. McGlumphy requested
Mr. Anthony DePrima, City Manager, come forward.
Mr. McGlumphy inquired if Mrs. Braun and Mr. Knotts were members of a union.
Mr. DePrima stated that he believed that Mrs. Braun was employed as a Secretary III, which was a
non-bargaining position. He stated that Mr. Knotts stepped into the vacancy as a dispatcher, did not
change his title, and was in a union position. He stated that Mr. Knotts’ title remained Dispatcher,
but he did not perform dispatch duties for many years. Mr. DePrima indicated that the position is
now reverting to a non-bargaining position, mostly due to the supervisory duties. Mr. DePrima
stated that he would not call the position a “super secretary”, but a supervisor of the dispatchers who
Page 126
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 2
is providing a lot of administrative assistance to the chief, similar to the work performed by
administrative assistants in other departments with the additional responsibility of supervision and
authority over technical people. He indicated that it is a non-bargaining position primarily because
of these supervisory responsibilities.
McGlumphy noted that the wording led to some confusion and inquired if the salary will remain the
same as when Mr. Knotts retired. Mr. DePrima stated this would depend on the level at which the
person is hired because there is a hiring range, but the rate could potentially be lower than
Mr. Knotts’ salary. Mr. McGlumphy mentioned that the paperwork states the intention to hire at
midpoint. Mr. DePrima stated that the position is budgeted at midpoint for estimating purposes and
that if an individual can be hired lower than midpoint they will be. He stated that the purpose of the
midpoint is just to provide a figure for the budget.
Mr. McGlumphy questioned when the word “midpoint” was adopted, stating that this term was still
being discussed. Mr. DePrima stated that the term “halfway point” would be appropriate.
Mr. McGlumphy inquired whether this referred to the market rate. Mr. DePrima stated that it is the
halfway point which was derived from taking the high and low figures from the salary range to the
middle of the scale and using that figure for budgetary reasons.
Mr. McGlumphy inquired if the position would be classified in the 117 category and Mr. DePrima
confirmed that it would be. Mr. McGlumphy asked if the person hired would be required to have
experience, noting that other employees classified in the 117 category have many years of experience
and when new employees are hired at midpoint they are brought in at a higher level. He stated his
understanding that additional administrative duties were involved in the proposed position.
Mr. DePrima stated that if an employee was hired at midpoint (noting that this was only a possibility
as the midpoint figure was used for budgetary purposes) the expectation would be that the selectee
would have experience.
Mr. McGlumphy asked if it was known at what level the employee would be selected. Mr. DePrima
noted that it will be up to Chief Christiansen to sort through the job applications to find the best
candidate. Mr. McGlumphy noted that when an individual is placed at midpoint in a class that
contains many others who are below midpoint, this can cause friction. Mr. DePrima noted that this
possibility exists with all non-bargaining positions. He reiterated that the midpoint was used only
for estimating purposes and stated that using a lower figure would be “low-balling”.
Mrs. Williams asked if an organizational level rating had been placed on the matrix for the proposed
position. Mr. DePrima stated that Mrs. Kimberly Hawkins, Human Resources Director, and
Chief Christiansen had ranked the position. He did not recall, but believed that there was no
organizational score. Mrs. Williams asked if this meant that the position was assigned a value of
“0”. Mr. DePrima stated that he believed that this was the score that Mrs. Hawkins had assigned.
Mrs. Williams questioned that rating, stating that if the category of organizational level or value was
to be added to the City’s rating system, the fact that an employee is being hired would indicate the
organizational value to be at least a “1”.
Page 127
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 3
Mr. DePrima stated that he felt that Mrs. Hawkins’ rationale for not putting a value on the
organizational level rating was that there are very few employees who have an assigned value.
Mrs. Williams stated that there are 13 positions that have organizational value assigned.
Mr. DePrima indicated that this would be 13 positions out of approximately 80 non-bargaining
employees.
Mrs. Williams felt that the purpose of assigning organizational value was to give certain people
raises. Mr. DePrima stated his disagreement with that supposition.
Staff recommended that the Committee forward the request to recruit for the position of Fire Chief’s
Assistant to Council with a favorable recommendation.
Mr. Leary moved to recommend approval of the request to recruit for the position of Fire
Chief’s Assistant, seconded by Mr. Salters and unanimously carried.
Assistant to the Community Development Manager (Temporary/Part Time Employee - CDBG -
Grant Funded)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, explained that the
City of Dover’s five (5) year Consolidated Plan is due to the Department of Housing and Urban
Development (HUD) by May 15, 2010 and the preparation of the plan is a very extensive process.
In addition, she stated that the City has received federal recovery funds through the Neighborhood
Stabilization Program (NSP) and the Housing Rehabilitation Program. She explained that managing
these programs results in a significant increase in the workload for the one (1) person office
responsible. She stated that the proposal is to hire a temporary, part-time employee to work
specifically on the housing rehabilitation program and NSP reporting and specifications. She noted
that the position would be entirely grant funded and charged to the housing rehabilitation line of the
program rather than the program administration line. Her expectation was that the employee would
assist Mrs. Tracey Harvey, Community Development Manager, until summer when the workload
is expected to return to normal levels.
In response to Mr. Shevock, Mrs. Townshend indicated that the position will end when grant funds
terminate. She stated that Mrs. Harvey had indicated that there are a number of retirees from the
Delaware State Housing Authority or other housing organizations who may be interested in the
position. She noted that these individuals would have experience in the area of housing and would
likely have no expectations of long-term employment.
In response to Dr. Jones, Mrs. Townshend stated that because the position was temporary and part-
time, she did not believe there was an obligation to advertise. She stated that Mrs. Harvey intended
to approach retired individuals who have expressed interest and who have a background in housing.
She stated her willingness to advertise the position if the Committee advised it, but indicated that
if this occurs, the position will not be filled by February 16, 2010, which was the goal stated on the
Committee Action Form.
Page 128
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 4
In response to Mr. Ruane, Mrs. Townshend stated that she did not believe that a job classification
was required for a temporary, part-time position. Mrs. Townshend stated that the pay rate for the
position was determined by comparing proposed duties to existing positions within the City. It was
determined that the duties were closest to existing employees in the Administrative Assistant
category and, therefore, the proposed salary was established based on the hourly rate of this job
classification. In addition, she felt the administrative duties and the requirement of a housing
background seemed to bring the position into the Administrative Assistant category.
Mr. DePrima believed that temporary part-time positions may be classified. He stated that this
position was “tagged” as an Administrative Assistant and an hourly salary would be tagged to that
range.
In response to Mr. Ruane, Mrs. Townshend stated that, although the programs are well underway,
monitoring and reporting requirements remain significant. Due to the fact that the NSP program is
running in tandem with the preparation of the CDBG Consolidated Plan, and the fact that spring is
the time when the CDBG action plan is prepared for the following grant year, she indicated there is
a 50% or more increase in the office workload.
In response to Mr. McGlumphy, Mr. DePrima stated that some permanent part-time positions have
been advertised and others have not, depending upon the position. He stated he had assumed this
position would be advertised.
Mr. Salters felt that there would not be a large number of qualified candidates for the part-time
position and felt advertising would cause delay. Mrs. Townshend stated that if the Committee
recommended approval of the position, it could be advertised prior to bringing the matter before
Council. Tentative selection could then be made pending Council’s granting permission to hire.
Staff recommended that the request to hire a temporary part-time employee to assist the Community
Development Manager be forwarded to Council with a favorable recommendation.
Mr. Salters moved to recommend approval of the request to recruit for a temporary, part-time
employee to assist with the Housing Rehabilitation Program and the Neighborhood
Stabilization Program, in an amount not to exceed $10,000, seconded by Mr. Leary and
unanimously carried.
Review of Extension - Title V Criminal Justice Council Grant - Girls Circle
Mrs. Ann Marie Townshend, Director of Planning and Community Development, explained that in
the fall of 2007, the City became the municipal recipient of a three (3) year grant through the
Criminal Justice Council aimed at providing programming for at-risk pre-teen girls. She indicated
that the City applied for and has administered this grant for the last two (2) years in partnership with
Aid in Dover, who provides the services through an after school program called “Girls Circle”. The
program is aimed at at-risk female youths and works to raise self-esteem and teach life skills.
Mrs. Townshend noted that the program has had good success in the first two (2) years,
demonstrating positive statistics and feedback from participants, and the Criminal Justice Council
Page 129
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 5
has been very pleased with it. She stated that the application is being brought to the Committee in
accordance with the City’s grant policy to receive City Council approval before submitting formal
application for the third year of funding for the program. She noted that all funds are passed through
Aid in Dover to provide the Girls Circle program and that the City of Dover incurs no direct
expenses for the program, aside from the staff time involved in grant administration.
In response to Mr. Salters, Mrs. Williams stated that the program is administered by
Mr. Mark Harmon, Instructor, and Ms. Lauren Mincy, Project Director, from Aid in Dover. She
stated that her position as Executive Director of Aid in Dover creates no conflict of interest because
no grant funds go toward her salary, she has no connection with the grant, and, as Council President,
has not participated in any votes related to this matter.
Mrs. Williams noted that this is the first time that the grant has been awarded outside of the City of
Wilmington.
Staff requested that the Committee forward the request to City Council with a favorable
recommendation.
Mr. Leary moved to recommend approval of the submission of a formal application for the
third year of funding for the Title V Grant through the Criminal Justice Council, seconded
by Mr. Salters and unanimously carried.
Proposed Ordinance #2010-05 - Chapter 2 - Administration, Article VI - Other
Post-Employment Benefits Fund, Section 2-505 - Medicare Part B Premium Reimbursements
Mrs. Donna Mitchell, Controller/Treasurer, explained that during the City Council meeting of
July 27, 2009, Council considered four (4) alternatives regarding the elimination of Medicare Part B.
At that time, Council approved one (1) of the alternatives: the elimination of Medicare Part B for
new hires. Mrs. Mitchell explained that during the City Council meeting of January 11, 2010,
Council decided to retain Medicare Part B reimbursement for current employees and retirees as it
currently exists and to eliminate this benefit for new hires. Mrs. Mitchell stated that the City
Solicitor recommended adoption of the proposed ordinance to document this decision.
Responding to Mr. Leary, Mrs. Mitchell verified that this ordinance in no way changes the policies
adopted by Council, but merely institutionalizes and formalizes what has already been decided.
Responding to Mr. Ruane, Mrs. Mitchell stated she was unsure which fund was referred to in Lines
16 and 17 of the draft proposed ordinance, which state that “the fund for payment of the costs of such
premium reimbursement shall be continued as in the past”. Mr. Ruane requested that Mrs. Mitchell
identify with a memorandum the fund to which this refers and assure Council that, as stated in the
City’s charter, “the fund for the payment of costs for such benefits shall be established and
identified.”
Page 130
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 6
Mr. Lester Blakeman, 209 Falmouth Way, retiree from the City of Dover Electric Department, stated
he had several points of concern regarding the draft ordinance, citing the following provisions:
1) Line 11-12 - “provided that it is clearly stated and understood that the
decision of Council, if approved by Council, is not vested and can be changed
or eliminated at any time”; and
2) Lines 15-16 - “provided that this is not to be considered a vested right and
can be changed or eliminated by Council at any time by ordinance or
resolution enacted to that effect.”
Mr. Blakeman agreed that Medicare Part B is not a vested employee right as he stated it is not
mentioned specifically in the Employee Handbook; however, he read into the record a selection from
the 2004 Handbook which he stated specifically addresses retirement benefits (Article XII, Section 2)
as follows:
“The City shall make available to full-time employees working at least thirty-seven
and a half (37.5) hours per week a City Retirement Plan. All employees hired after
July 1, 1991 shall be required as a condition of employment to join a plan.
Employees shall remain members until their employment with the City ceases, retires
or pass away. Pension benefits shall be provided through one of the following:
(A) Police Pension Plan (Sponsored either by the City of Dover or State of
Delaware)
(B) General Employee Pension Plan
(C) Defined Contribution Plan
The City shall provide group hospital, surgical and health insurance coverage for
retired employees and their families. The City pays 100% of each retiree’s individual
coverage and 75% of the cost of dependent coverage. This applies to all retirees,
unless otherwise specified in employee labor agreements.”
Mr. Blakeman believed that if the City stops paying Medicare Part B, responsibility for paying
medical insurance would be transferred to a very small, select group of retirees, those who are not
represented by unions. He believed these employees were being singled out and treated differently
than other employees. He stated that, although Medicare Part B is not institutionalized, 100%
payment of medical retirement health care is stated in the handbook as a benefit to employees.
Mr. Blakeman provided members with information regarding Retiree Medical Insurance Cost at
Age 65 (Attachment #1). He stated that upon retirement, employees enrolled in all plans would
revert to the PPO Special Medicfill rate listed on Page 2 of the handout. Referring to the rates listed
on Page 1 of the handout, Mr. Blakeman stated that if the City made payments for retirees at the
Page 131
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 7
Medicfill rate, the City would incur an additional cost of $5.62 for employees on the First State Basic
Plan; however, savings would be realized for employees on the three (3) other health care plans
listed.
Mr. Leary stated he did not understand the connection between the cost sheet provided and the
discussion regarding the proposed ordinance. He indicated that the proposed ordinance would make
it more difficult to eliminate Medicare Part B for non-represented employees.
Mr. Blakeman felt that preserving the language in the ordinance that would allow Council to revisit
this issue in the future would amount to having a “sword over the head” of non-bargaining
employees.
Mr. Salters explained that Council had voted to retain the Medicare Part B benefit for non-bargaining
employees, but felt that the City cannot be held to what may happen in the future.
After a lengthy discussion, Mr. Blakeman summarized by stating that he began working in the City
with the understanding that he would perform his job and the City would perform what it promised
to do as well. He believed that the proposed ordinance states that this is no longer true.
Mr. Scott Koenig, Public Services Manager, stated his appreciation for the City’s effort to try to
memorialize the discussions on this issue over the past few months. He felt some concerns might
be eased if some changes were made in the language of the ordinance as follows:
1) Line 16 - Mr. Koenig suggested that the statement that the provision of
Medicare Part B can be changed by “ordinance or resolution” be changed by
striking the word “resolution”. He believed that the passing of an ordinance
requires a public hearing and a higher standard of consideration.
2) Line 16 - Mr. Koenig felt that the phrase “at any time” could cause concern
whenever an agenda is posted, which he felt becomes a detriment to the
relationship between the City and current employees and retirees. He
proposed amending the language to have this decision be evaluated on an
annual basis as part of the budget process.
3) Mr. Koenig felt that everyone who is currently eligible or receiving Medicare
Part B should be provided a 90-day written notice by the Council if this issue
is going to be considered in the future so that those out of the area or
unavailable would have ample time to respond.
4) Mr. Koenig’s final concern related to the three (3) distinct groups of
employees he believed were affected by the ordinance, which he explained
were current non-bargaining employees, those just retired but not receiving
the benefit yet, and those who are retired and receiving the benefit. He
Page 132
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 8
questioned whether it was Council’s intent to consider all of these employees
equally if this matter were to be examined again in the future.
In response to Mr. Hogan, Mr. Koenig stated he would be willing to incorporate language into the
ordinance to conform with his proposed changes.
Mr. DePrima indicated his preference that consideration of this matter not be linked to a budget, as
this would place a burden on the City Manager to review this issue every year during budget
preparation. He felt another time would be appropriate. In addition, he stated that ordinances do not
always require a public hearing, and that public hearing and notification procedures mentioned
should be written into the ordinance if it was Council’s intent to require them.
Mr. Salters felt that the notification process could become cumbersome and suggested Mr. Koenig
include an easy way to accomplish this in any proposal prepared for Mr. Hogan.
Mr. Ruane stated that the language in the ordinance prepared by Mr. Rodriguez appears to echo the
existing language in the City Charter, which states that the “authority to provide benefits on the part
of the City shall be evidenced by an ordinance or resolution duly adopted”. He felt that eliminating
the word “resolution” would necessitate an amendment of the Charter.
Mr. Salters moved to recommend adoption of Proposed Ordinance #2010-05 - Chapter 2 -
Administration, Article VI - Other Post-Employment Benefits Fund, Section 2-505 - Medicare
Part B Premium Reimbursements (Attachment #2), as recommended by staff, seconded by
Mr. Leary and unanimously carried.
Discussion - Requirement that Council, Committees, Commission, and Board Members Step
Down When Running for Other Office
Mr. Hogan explained that during their Regular Meeting of December 14, 2009, members of Council
considered a request from the Dover Human Relations Commission (DHRC) to remove the
requirement that members resign prior to running for other office. Although the recommendation
was denied, as recommended by the Legislative, Finance, and Administration Committee,
Councilmen Leary and Hogan suggested the possibility of instituting this requirement for all
committees and commissions of the City of Dover, as alternatively recommended by the DHRC.
Mr. Hogan noted that the DHRC and the Ethics Commission are the only committees in the City that
have this requirement. He felt this to be discriminatory and believed all committees and
commissions should have the same set of rules. Mr. Hogan recommended that Council, committee,
commission, and board members be required to resign prior to running for other office and direct
staff to prepare necessary ordinances to effect the change, and Mr. Leary stated his support for this
action.
In response to Mrs. Williams, Mr. Leary explained that, under this proposal, if an individual files
papers for an elected office, they would be considered resigned from their current Council,
committee, or commission position. He added that he would like to include the Mayor’s position
as well and felt that a Council person should be required to resign before running for Mayor.
Page 133
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 9
Mr. Hogan stated that when citizen members of committees file for City Council seats, conflicts of
interest can arise. He also believed that if an individual occupies one office while running for
another, it is difficult to perform their primary function.
Mr. Ruane felt that this action would step beyond the limitations of the charter and the municipality.
He stated that the qualifications for offices are set by the City Charter and Code, and by State law.
He felt that the focus should be kept on limiting the right to return to an office or appointment
already held. In addition, he stated that the nature of the City’s appointments vary broadly, citing
examples of the Awards Committee, 4th of July Committee, and Planning Commission. He felt it
was important to distinguish between the types of appointees by City government and that the
prohibition on running for office should be limited to those positions that have been delegated
authority for implementing City ordinances or exercising proscriptive duty specified elsewhere in
the Code versus ad hoc committees.
Mr. Leary explained that in approximately 1992, three (3) members of Council sought other elected
offices which turned out to be “mildly disruptive”, as campaign issues entered into municipal
discussions which became “uncomfortable”. At that time, he stated, he and some of his colleagues
sponsored a similar piece of legislation applying to the Mayor and members of Council. He stated
that a Charter Amendment was put forth at that time which passed the State House of
Representatives but failed in the State Senate. He stated the City can proscribe the activities of its
own officials if the Charter is amended and the State accepts this.
Mr. McGiffin disagreed with the proposed ordinance, stating that he felt the State or District-level
voters should have the authority to determine whether an appointee can handle the responsibility of
serving while running for office. In addition, he believed it would be a mistake to prohibit those who
serve on committees from running for Council office, since he felt that committees are the natural
ground from which candidates arise to run for Council. He felt this prohibition would dissuade
citizens from running for Council or serving on committees and urged that the prohibition not be
expanded.
Mr. Leary moved to table this item for further discussion, seconded by Mr. Salters and
unanimously carried.
Final Report - Revenue/Cost Saving Ideas Submitted for Consideration
This item was deferred until the Committee Meeting of February 8, 2010, due to time constraints.
Mr. Salters moved for adjournment, seconded by Mr. Leary and unanimously carried.
Page 134
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF JANUARY 25, 2010 PAGE 10
Meeting Adjourned at 7:05 P.M.
Respectfully submitted,
William P. McGlumphy
WPM/JS/TAM/rr
S:\ClerksOffice\PACKETS\2010\Council\02-08-2010\01-25-2010 LF&A REVISED.wpd
Attachments
Attachment #1 - Retiree Medical Insurance Cost at Age 65
Attachment #2 - Proposed Ordinance #2010-05 - Chapter 2 - Administration, Article VI - Other Post-Employment
Benefits Fund, Section 2-505 - Medicare Part B Premium Reimbursements
Page 135
ATTACHMENT #1
LF&A Committee Meeting of 1/25/2010
Page 137
ATTACHMENT #2
LF&A Committee Meeting of 1/25/2010
CITY OF DOVER PROPOSED ORDINANCE #2010-05
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Chapter 2 - Administration, Article VI - Other Post-Employment Benefits Fund, be amended
4 by inserting a new Section 2-505 - Medicare Part B Premium Reimbursements, as follows:
5 Sec. 2-505. Medicare Part B Premium Reimbursements
6 On July 27, 2009, Counci1 approved the recommendation of the Legislative, Finance, and
7 Administration Committee's recommendation not to provide for Medicare Part B premium
8 reimbursement for all non-bargaining employees which applied only to new hires after July 27, 2009.
9 The City currently provides Medicare Part B premium reimbursement for all other non-bargaining
10 employees and the Legislative, Finance, and Administration Committee recommends that this
11 practice be continued provided that it is clearly stated and understood that the decision of Council,
12 if approved by Council, is not vested and can be changed or eliminated at any time.
13 The City of Dover shall continue to provide Medicare Part B premium reimbursements for all
14 non-bargaining employees other than those new hires after July 27, 2009, as it has done in the past,
15 provided that this is not to be considered a vested right and can be changed or eliminated by Council
16 at any time by ordinance or resolution enacted to that effect and, further, that as required by the
17 Charter, Section 3, the fund for payment of the costs of such premium reimbursement shall be
18 continued as in the past.
19 SYNOPSIS
20 The City in the past has provided to all non-bargaining employees Medicare Part B
21 premium reimbursement. On July 27, 2009, Council adopted an ordinance that
22 terminated such premium reimbursement for non-bargaining employees hired on or
23 after July 27, 2009. The effect of this ordinance is to reaffirm the position of the City
24 to continue to provide Medicare Part B premium reimbursement for all
25 non-bargaining employees hired previous to July 27, 2009, with the complete and
26 absolute understanding that this decision of Council does not convey or establish any
27 vested right to non-bargaining employees to receive this premium reimbursement in
28 the future and that such decision of premium reimbursement may be changed or
29 eliminated by Council at any time.
30 ADOPTED: *
31 S:\ClerksOffice\Ordinances\2010\Draft Ordinances\Ordinance 2010-05.wpd
32 Actions History
33 January 25, 2010 - Scheduled for Consideration by the Legislative, Finance, and Administration Committee
Page 138
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee Meeting was held on January 27, 2010, at
6:00 p.m. with Councilman Hogan presiding in the absence of Chairman Slavin. Members present
were Mr. Hogan, Mrs. Russell, Mr. Davis, and Mr. Harmon (arrived at 6:10 p.m.). Members of Council
present were Mr. Leary and Mr. Ruane.
AGENDA ADDITIONS/DELETIONS
Mr. Davis moved for approval of the agenda, seconded by Mrs. Russell and unanimously
carried.
Request for Amendment to Chapter 18 - Animals, Section 18-16 - Keeping Bees
Members were provided a letter received from Mr. Bill Benton requesting an amendment to
Chapter 18 - Animals, Section 18-16 - Keeping Bees. Mr. Benton advised members that the honey
bee is endangered and explained the devastating effect this could have on the food supply. He also
explained the benefits of having bees in urban areas and noted that many other cities are now
allowing the keeping of bees within city limits. Members were provided with an article, “Bee Bill
Creates a Buzz”, regarding action taken during the Denver City Council Meeting in November 2008.
He assured members that the bees are bred for gentleness and that most bee stings are caused by
other types of bees, such as wasps.
Referring to the City’s current ordinance regarding the keeping of bees, Mr. Hogan noted that the
City allows for the keeping of bees; however, there are set-back requirements.
Mr. Bob Volkomer, Vice President of the Kent County Beekeepers Association (also member of the
Frederica Town Council and past Mayor), advised members that he is a suburban beekeeper, residing
within town limits, and maintains approximately eight (8) colonies of bees on a 60’ x 100’ lot.
Being a beekeeper for 35 years, Mr. Volkomer stated that he has not received a single complaint
from any neighbors nor complaints to town hall. He advised members that his eight (8) year old
grandson works with the bees. Mr. Volkomer stated that bees are essential to the environment,
explaining that bees are responsible for 1/3 of the world’s food supply and that there is a movement
to encourage bee keeping. He indicated that bees provide benefits to residents, such as pollination
of gardens and shrubs, and that managed bees are gentle. He assured members that as a beekeeper,
he has received only positive comments from his neighbors. With regards to the City of Dover’s
current ordinance, he advised members that the set-back requirements are such that they disqualify
most residents within the City limits. He requested that members consider amending the ordinance
in such a manner that would allow beekeepers to keep bees on the suburban lots within the City
limits.
Responding to Mr. Hogan, Mr. Volkomer stated that there were two (2) City of Dover residents at
a recent Beekeepers course, including Mr. Benton, and that he is aware of three (3) beekeepers
within the City of Dover limits. He stated that no members of the Kent County Beekeepers
Association are from the City of Dover.
Responding to Mr. Davis, Mr. Volkomer referred to an article he provided to members titled
“Backyard Beekeeping” (Attachment #1) and suggested that, in addition to setbacks, there would
be additional amendments necessary to the City’s ordinance. He also suggested that members review
the “Model Beekeeping Ordinance” (Attachment #2) for developing possible amendments to the
City’s ordinance.
Page 139
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 2
Mr. Robert Mitchell, State Apiarist, Plant Industries Section, Delaware Department of Agriculture,
advised members that the Department of Agriculture encourages the keeping of honey bee colonies.
He noted that many beekeepers live within city/town limits and they do not experience problems,
are good neighbors, etc. It was his opinion that beekeeping should be permitted in the City of Dover
and, from a biological perspective, the keeping of bees in urban areas is a wise choice. Based on
USDA research, Mr. Mitchell advised members that when an area is saturated with the genetics
preferred, which would be managed European bee colonies, when the event of Africanized bees does
occur, the amount of genetic material in the area will alleviate many of the problems. Although the
genetic material is one resource, he advised members that another resource is the beekeepers
themselves. Mr. Mitchell advised members that a minimum of 200 calls per year have been received
regarding honey bee swarms in Dover. He assured members that the majority of these swarms are
generated from people in the City. Mr. Mitchell stated that nature abhors a vacuum and there will
be something needed to fill it, which will be bees of some type. When the Africanized bees arrive,
if the domestic bees are abundant and remain well managed through requeening, the Africanized
strain will soon become domesticated and its impact will be minimal. Mr. Mitchell encouraged
members to consider less stringent requirements and setbacks with regards to beekeeping. With
regards to safety and security concerns, Mr. Mitchell advised members that there is a colony of honey
bees at the U.S. White House.
Responding to Mr. Harmon, Mr. Mitchell stated that there are voluntary programs for beekeepers
and regional beekeepers associations that administer tests for beekeepers to become master
beekeepers. In Delaware, the only requirement for beekeepers is that they register their honeybee
colonies.
With reference to the City’s current ordinance, Mr. Leary advised members that there was a
beekeeper whose neighbors complained about the keeping of the bees, explaining that they were a
nuisance. The 150’ setback was established as a compromise by allowing the keeping of bees while
not infringing upon their neighbors. Since there have not been any concerns or complaints since, he
encouraged members to consider this history in their consideration of any amendments to the
ordinance.
In response to Mr. Leary’s comments, Mr. DePrima also recalled that the immediate next door
neighbor to the beekeeper had a child that was allergic to bees and was unable to use their backyard
due to the bees. However, he stated that he did not recall any discussions regarding fencing, water,
or other requirements that could alleviate some of the concerns of residents.
Mr. Hogan suggested that if Mr. Mitchell was willing to draft proposed ordinance amendments, the
committee would be willing to consider such amendments at a future meeting.
Central Delaware Chamber of Commerce Transportation Recommendations (Frank Fantini)
Mr. Frank Fantini, Chair of the Central Delaware Chamber of Commerce Transportation Committee,
explained that transportation is an extraordinarily important economic development issue. He
reviewed the Delaware Central Chamber Transportation recommendations that were provided to
members.
Page 140
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 3
Mr. Ray Harbeson, Member of the Central Delaware Chamber of Commerce Transportation
Committee noted that many of the project priorities for the Chamber of Commerce are also project
priorities that were submitted to DelDOT by the City of Dover. He reviewed the revenue generating
concepts being considered for the Transportation Trust Fund to allow some of the projects to begin.
Although the recommendations have not been approved by the Chamber of Commerce Board, they
have authorized the committee to discuss the issues to determine consensus.
Mr. Davis relayed concern with the idea of instituting additional taxes to users during the current
economic times and, although he felt that the requests were not unreasonable, additional information
would be necessary prior to making any final decision in support of the recommendations.
Responding, Mr. Harbeson stated that economists have shown that for every dollar put into a
transportation program, an additional transportation infrastructure job is created, and for every
infrastructure job that is created, an additional 1.7 jobs are created in the local economy.
Mr. Ruane felt that there was a great opportunity for the City to partner with the Chamber of
Commerce, noting that the coincidence of priorities is incredible, being practically the same list
developed by the committee and approved by City Council. With the Chamber’s support, he felt that
the City would have a better opportunity for drawing attention to the priorities and support from the
Delaware Department of Transportation (DelDOT) level. With regards to the funding arrangements,
it was Mr. Ruane’s opinion that the recommendations presented are a general notion of items to be
further considered and that the committee is not being requested to take a position on the items at
this time. The City of Dover, as a municipality, is being provided an opportunity to “lead the way”
as the Chamber approaches other municipalities to obtain support. He urged members to adopt the
recommendations as presented.
In response to Mr. Hogan, Mr. Harbeson explained that the recommendations are ideas that were
presented to the Chamber of Commerce Board and that they gave authorization to work with other
Chambers, the Committee of 100, the Delaware Contractors Association, etc. to determine if there
is support on a consensus on what revenues should be advanced. Although they are not expecting
action by the City on the list of recommendations, they welcomed any additional suggestions to be
considered for inclusion in the recommendations. Mr. Harbeson indicated that once the
presentations have been made to the various groups, a final presentation will be made to the
Chamber of Commerce Board for final approval of the recommendations.
Mr. Hogan clarified that, at this time, it is being requested that the committee support the Central
Delaware Chamber of Commerce Transportation Committee and encourage the continuation of the
process of presenting the recommendations to other groups.
Mrs. Russell moved to recommend that the City encourage the Chamber of Commerce to
continue with this process and look forward to the final recommendations. The motion was
seconded by Mr. Davis and unanimously carried.
Page 141
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 4
Waiver Request to Allow for the Creation of a Lot Without Public Street Frontage - Garrison
Oak Technical Park
Members considered a request for waiver from the street frontage requirements for the Garrison Oak
Solar Park Lot 15. In accordance with Article 6, Section E of the City of Dover Subdivision Code,
all lots in a subdivision shall have frontage on a public street. The solar park would like to begin
construction prior to completion of the Garrison Oak Technical Park. In order to develop the solar
park on lot 15, it is necessary for the City to provide a 60’ wide access easement from White Oak
Road. This lot would later comply with the street frontage requirements once the Garrison Oak
Technical Park is built. Because of this peculiar condition, staff believes the necessary requirements
to waive the street frontage requirement have been met.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, provided members
a revised Waiver Report (Attachment #3), and stated that the Planning Commission granted
conditional approval on January 19, 2010 of the Site Plan to permit the construction of a
photovoltaic electric generating facility on a portion of the total 103.54 +/- acres of Lot #15. The site
(Lot #15) is within the Garrison Oak Technical Park and is zoned IPM-2 (Industrial
Park/Manufacturing Technology Center) and SWPOZ (Source Water Protection Overlay Zone) Tier 2.
The property is located on the northwest side of White Oak Road, east of Route 1, owned by the City
of Dover. The property address is 1499 White Oak Road (Tax Parcels: ED05-068.00-01-01-00 and
LC05-068.00-01-03.00).
Mrs. Townshend advised members that the proposed subdivision of Garrison Technical Park is
subject to the requirements of the Land Subdivision Regulations, specifically Article VI, Subdivision
- General Requirements and Design Standards. In Article VI, §E - Lots, item 5 requires “All lots in
a subdivision shall have frontage on a public street”. The proposed parcel configuration to subdivide
Lot #15 does not result in the lot having frontage on a public street; therefore, the applicant has
requested a waiver under the provisions of Article VII, Special Provisions, Section A - Variance and
Waiver.
Mrs. Townshend explained that access to Lot #15 would be via a 60 foot wide cross access easement
through the Garrison Oak Technical Park site to connect to White Oak Road. This access easement
and waiver from the required road frontage will not be necessary once the remainder of the Technical
Park is completed and the associated roads for the park are constructed. With the completed
Technical Park, the proposed roadway through it will provide Lot #15 with the required frontage.
As requested, the waiver will allow the Solar Park to proceed in its development prior to the overall
Garrison Oak Technical Park.
Staff recommended approval of the waiver request to create a lot (Lot #15) without public street
frontage, recognizing the development of this area as a Solar Park. The Garrison Oak Technical Park
will follow closely behind the development of the Solar Park and this access easement is meant to
be a temporary measure to allow the Solar Park to move forward in accordance with its design needs.
In order to achieve any street frontage for the proposed Lot #15, the Solar Park would require an odd
property line configuration and the need to reconfigure the Garrison Oak Technical Park once that
application comes before the Planning Commission. The configuration for Lot #15, as presented
with the waiver of the requirement for lot frontage as a temporary measure, is the better option for
clarity.
Page 142
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 5
During their meeting of January 19, 2010, the Planning Commission reviewed the proposed waiver
request as part of its review of the Dover Solar Park at Lot #15 of the Garrison Oak Technical Park
and recommended approval of the waiver to allow the creation of a lot (Lot #15) without public
street frontage, recognizing that this is a temporary measure until the remainder of the Garrison Oak
Technical Park is completed.
Mr. DePrima reminded members that there is a land lease from the City and, for financing purposes,
the solar company needs their facility to be located on a separate legal lot, which created an issue.
Mr. Davis moved to recommend approval of the requested waiver, as recommended by the
Planning Commission, seconded by Mr. Harmon and unanimously carried.
Discussion - Alcohol Related Issues
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that over the last year, downtown Dover has experienced increased problems associated with crowds
during late hours when bars close. Problems have included nuisance complaints, such as public
urination, loitering, and vandalism, and more serious complaints such as fights involving weapons.
On a number of occasions, fights in the downtown area have required significant police response
involving the entire shift to respond, as well as units from neighboring police departments.
Currently, the City is limited in its ability to hold businesses accountable for controlling the crowds
in their establishments, especially once these crowds leave. In the downtown area, as soon as patrons
leave the building they are in the public right-of-way and not a private parking lot controlled by the
business owner. Fights may start inside an establishment and spill out into the street. In cases where
the business is not responsive to requests to better manage the situation, there is currently nothing
in Dover Code that allows the City to require that the business be responsive.
During the Downtown Dover Partnership (DDP) Board Meeting held in December 2009,
Mrs. Townshend stated that there were a number of downtown business owners in attendance
requesting that the Partnership and the City provide assistance to improve the situation before it
jeopardizes their businesses. In early January, the Executive Committee (officers and committee
chairs) of the Downtown Dover Partnership met to discuss how this issue could be addressed. The
Planning Office and Police Department presented some potential ideas for Code changes that would
give the City tools to address the problems and hold businesses accountable for managing their
crowds.
Mrs. Townshend advised members that the idea that meeting attendees believed had the most
potential was to create a license for establishments that serve alcohol that would include certain
conditions that mirror State Alcoholic Beverage Control Commission rules. She stated that an
ordinance could be drafted in this regard and brought forward through the City’s process for
adoption. Before bringing such an ordinance through the City Council process, staff would work
with the DDP and other affected communities to ensure that it addresses the issues appropriately.
Before investing significant time and resources into this effort, staff felt it was important to get the
concurrence of City Council, through this Committee, that such an ordinance is desired. Part of the
ordinance development process will include researching provisions that other Delaware
municipalities have in place to address such issues.
Page 143
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 6
Staff requested that the committee provide direction in terms of drafting ordinances to address
concerns from the community about the impact of bar crowds.
Mr. Eric Wilke, business owner and resident of downtown Dover, read a statement into the record
(Attachment #4). He advised members that this statement was also read to the Downtown Dover
Partnership Board a couple of months ago and that the attention provided to him, as a resident and
merchant, by the City through the Partnership has been tremendous. He thanked staff for their efforts
in their attempts to address these problems. He suggested that members visit downtown late in the
evening to observe the problems mentioned in his statement.
Mr. Harmon concurred with the concerns relayed and noted that there is a lack of police
representation. It was his feeling that more police representation, both foot patrol and riding through,
would deter many of the problems that have been expressed. He questioned the current situation for
police presence on Loockerman Street.
Responding, Mrs. Townshend stated that foot patrol is provided through police extra duty and that
there is no dedicated foot patrol for Loockerman Street. With grant funds, she stated that foot patrol
has been provided and that the quality of life unit, consisting of four (4) officers, has spent a
considerable amount of time along Loockerman Street; however, with the current economic situation
and furloughs, these officers have been rotated to patrol.
Mr. Ruane felt that the City had the necessary ordinances to prohibit the undesired actions that have
been described and have been occurring. He suggested that the issue is with the enforcement of
these ordinances, which would require additional policing. Although he felt that businesses should
be held responsible for actions that take place on their premises and parking lots, he relayed concern
with the development of legislation that would hold a business responsible for the behavior of
“customers off premises”. Should additional legislation be drafted, Mr. Ruane suggested that, in
addition to the Police Department, staff should include the merchants in the development of any
ordinances.
In response to businesses being responsible for behavior of “customers off premises”,
Mrs. Townshend explained that there are certain behaviors, such as an individual who walks out of
an establishment with an open container. In accordance with current laws, the police only have the
ability to cite the individual and there is no law that would require a business to be responsible for
protecting their entrance by prohibiting the individual from walking out with an open container.
Mr. Davis indicated that other municipalities, such as Philadelphia, do hold a business, as well as
bartenders, responsible for the actions of customers off premises. Although the City of Dover may
not be interested in this consideration, he advised members that other cities have such ordinances.
Mrs. Russell moved to recommend that staff be authorized to begin the process of drafting
ordinances to address the concerns of the community, seconded by Mr. Harmon and
unanimously carried.
Page 144
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 7
Briefing on Delaware Department of Transportation (DelDOT) Projects - Gary Laing
Mr. Gary Laing, Community Relations Officer for the Delaware Department of Transportation
(DelDOT) and Public Relations Liaison, referred to the previous discussion regarding the Central
Delaware Chamber of Commerce Transportation Recommendations, and assured members that
DelDOT has been internally reviewing ways to be more efficient and reduce costs. As an example,
he stated that Department of Transportation Secretary Wicks recently announced the merging of the
toll operations with the Division of Motor Vehicles. In addition, the office hours for the E-Z Pass
Office are currently 24-7, which will be reduced. He advised members that the Smyrna rest stop is
currently staffed 24-7 and that DelDOT will be reducing the hours the facility will be staffed;
however, he indicated that customers will still be able to use restroom facilities and vending
machines.
Mr. Laing provided members a briefing on DelDOT Projects, as follows:
West Dover Connector
Mr. Laing stated that there is no further information regarding the West Dover Connector. The
project is currently at a standstill, partly due to a funding issue and partly due to the legal processes.
South Governors Avenue Improvements
Mr. Laing reported that there has not been much work on the improvements to South Governors
Avenue recently due to the weather, noting that, since November, there has been rain, a major snow
storm, and more rain. Due to this moisture, the ground is extremely saturated. Even if conditions
improve to the point that would allow work on the improvements, Mr. Laing stated that, due to the
time of year, necessary materials are not available, explaining that asphalt plants close during certain
periods of the year.
Water Street Railroad Crossover
Mr. Laing reminded members that the Water Street Railroad Crossover is a long-term project, noting
that an agreement with the Railroad and General Assembly will be required. Once the agreement
is reached with Northfolk Southern, he indicated that DelDOT will need the concurrence of the
General Assembly before a crossing can be closed anywhere in the State. At that time, Mr. Laing
stated that DelDOT will need the City’s support in convincing the legislators that it needs to be
accomplished.
Responding to Mr. DePrima, Mr. Laing assured members that DelDOT has staff working on this
project.
North State Street Paving and Rehabilitation
Mr. Laing reminded members that during a previous meeting, there was much discussion, regarding
the proposal for conducting overnight work on the North State Street Paving and Rehabilitation
Project. He stated that much of the jackhammer work can now be done during daylight hours. He
advised members that an agreement has been reached with the City for the milling and paving
operations, which DelDOT preferred to have completed during the evening hours. Mr. Laing
advised members that this work should only take four (4) evenings, two (2) for milling and two (2)
for paving, and is a “rolling” operation; therefore, they would not be in front of a residence all
Page 145
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 8
evening. Due to work being performed by Chesapeake Utilities, DelDOT has had to delay this work.
He assured members that the work will begin in the spring and that residents will be notified in
advance of this work beginning.
Briefing on City of Dover Projects
Mr. Tony DePrima, City Manager, provided a briefing on City of Dover Projects, as follows:
Wyoming Mill Road Project
Mr. DePrima indicated that although the Wyoming Mill Road Relocation Project is a DelDOT
project, it is being managed by the City of Dover. He advised members that there have been
discussions with Ms. Carolann Wicks, Secretary of the Department of Transportation, and that she
has indicated an agreement for assuming the management of the project. He explained that the
project is more expensive than anticipated and that more match money would be required.
Secretary Wicks has also agreed to look for additional dollars from savings from other projects.
Mr. DePrima stated that many of the residents were not notified of the realignment of the roadway
and that, as a result, there will be more outreach and community discussions regarding the project.
Mr. DePrima advised members that a request was submitted by a legislator requesting the installation
of a traffic signal at Wyoming Mill Road and North Street. The City is discouraging the approval
of this request since there would be a substantial expense for temporary matter. Mr. Laing assured
members that due to the costs and the knowledge of there being a realignment, DelDOT will not be
taking any action regarding the installation of the requested traffic signal.
Briefing on Dover/Kent County Metropolitan Planning Organization (MPO) Projects -
James Galvin
Mr. James Galvin, Principal Planner, Dover/Kent County MPO, explained that the Dover/Kent
County MPO is currently redoing the Transportation Improvement Projects (TIP) and has begun the
process of identifying the projects in the Comprehensive Transportation Program (CTP). He
reminded members that the Loockerman Street/Forest Street Project was removed from the CTP last
year and that the project has been relisted in the CTP; however, it is listed for an out-year and is not
a part of the TIP.
Mr. Galvin reminded members that the MPO will be considering a Regional Bicycle Plan for the
County and that it is hoped that the plan will include connections for the City of Dover to regional
facilities, as well as for other municipalities. He assured members that public input and involvement
will be planned.
Mr. Galvin stated that the MPO is currently assisting the County with their Transportation
Investment District Plan, which goes along with their Comprehensive Plan and its relationship to
Transportation Projects. There has been consideration of a corridor around the transit center, running
along Water Street from West Street to the Capitol. This concept will be presented to City staff, as
well as the Downtown Partnership, in an attempt to obtain support.
Page 146
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF JANUARY 27, 2010 PAGE 9
Responding, Mr. DePrima felt that the North Street corridor, from the Railroad tracks to the
Townsend Building, needs as much attention as Water Street and requested consideration.
Mr. Davis moved for adjournment, seconded by Mr. Harmon and unanimously carried.
Meeting Adjourned at 8:02 P.M.
Respectfully submitted,
Kenneth L. Hogan
Acting Chairman
KLH/RR/jg/js/tm
S:\ClerksOffice\Agendas&Minutes\Committee-Minutes\2010\01-27-2010 SA&T.wpd
Attachments to Original Minutes and File Copy:
Attachment #1 - “Backyard Beekeeping” Article
Attachment #2 - "Model Beekeeping Ordinance"
Attachment #3 - Revised Waiver Report - Street Frontage Requirements for the Garrison Oak Solar Park Lot 15
Attachment #4 - Open Letter from Eric Wilke
Page 147
CITY OF DOVER
FINANCE DEPARTMENT
MONTHLY BUDGET REPORT
DECEMBER 2009
PREPARED BY: FINANCE DEPARTMENT
PLEASE NOTE – THIS REPORT PROVIDES TOP LINE INFORMATION ON THE THREE MAJOR
OPERATING FUNDS. IF YOU WOULD LIKE ADDITIONAL INFORMATION, PLEASE FEEL
FREE TO CONTACT THE FINANCE DEPARTMENT.
Page 148
Page 2 of 7
City of Dover
Finance Department
Monthly Budget Report
December 2009
S
Strategic Objectives for Fiscal Year 2009 – 2010
1. Coordinate audit program with the Legislative, Finance & Administrative Committee. Meet all
deadlines as established in the audit program.
2. Fortis training and implementation for Payroll and Accounts Payable.
3. Each staff member will take three (3) in house Sungard training sessions.
ACTIVITY LEVELS
FY09 YTD FY10 YTD
BANK TRENDS
Number of Deposits Made 760 584
Total Amount of All Deposits $ 75,084,279 $ 72,750,137
PAYROLL
Hours % Amount Hours % Amount
Gross wages per registers 464,726 100.0% $ 10,473,654 517,606 100.0% $ 11,305,766
Wages and Hours Worked
Regular 396,562 85.3% $ 8,518,464 416,233 80.4% $ 8,770,111
All over time 16,117 3.5% $ 643,107 19,183 3.7% $ 769,482
Other Paid or Unpaid Wages and Hours
Vacation 31,877 6.9% $ 815,527 33,925 6.6% $ 889,530
Sick 10,888 2.3% $ 235,917 10,307 2.0% $ 228,779
Furlough - 0.0% $ - 12,659 2.4% $ -
Terminal Leave - Retiree Vacation/Sick Payout 1,274 0.3% $ 34,694 10,225 2.0% $ 345,717
Comp Time (Police) 1,977 0.4% $ 50,348 3,175 0.6% $ 96,572
Personal 568 0.1% $ 14,883 589 0.1% $ 15,699
Leave Without Pay 4 0.0% $ - 2,811 0.5% $ -
Other (description below) 5,460 1.2% $ 159,732 8,452 1.6% $ 190,189
Other includes: pay adjustments, military differential pay, committee meetings, worker compensation tracking/adjustments, etc.
Other Activity
Number of Pay Periods 13 14
Number of Payroll Checks Issued 5,779 6,131
Number of Pension Checks Issued 1,339 20,879
Total Pension Benefits Paid - Defined Benefit Plan $ 2,063,272 $ 2,150,664
ACCOUNTS PAYABLE
Number of Check Vouchers 4,438 3,794
Number of EFT Vouchers 1,004 862
Vouchers Dollar Amount Disbursed $ 68,273,232 $ 59,208,433
Page 149
Page 3 of 7
City of Dover
Finance Department
Monthly Report – December 2009
General Fund Summary
50% of
Budget YTD Balance Budget
Receipts
Beginning Balance $ 2,816,763 $ 3,628,890 $ (812,127) 128.8%
Court of Chancery Fees 745,000 213,530 531,470 28.7%
Fines & Police Revenues 965,000 398,948 566,052 41.3%
Franchise Fees 486,000 119,436 366,564 24.6%
Grants 734,000 159,045 574,955 21.7%
Intrafund Services 4,475,714 2,053,113 2,422,601 45.9%
Library & Recreation Revenues 668,008 308,534 359,474 46.2%
Licenses & Permits 2,334,000 1,879,101 454,899 80.5%
Property Taxes (Includes BID Revenue) 10,237,938 9,977,289 260,649 97.5%
Sanitation Revenues 1,420,000 748,224 671,776 52.7%
Other Miscellaneous Revenues 348,785 105,094 243,691 30.1%
Transfers-In from Other Accounts & Utilities
Civil Traffic Penalties 700,000 196,107 503,893 28.0%
Municipal Street Aid Fund 775,200 - 775,200 0.0%
Transfer Taxes 1,400,000 367,337 1,032,663 26.2%
Water/Wastewater Fund 548,020 548,020 - 100.0%
Electric Fund 6,758,100 6,758,100 - 100.0%
Total $ 35,412,528 $ 27,460,768 $ 7,951,760 77.5%
Expenditures
City Clerk & Council $ 403,264 $ 169,047 $ 234,217 41.9%
Mayor, City Manager & Human Resources 1,074,989 509,009 565,980 47.4%
Police & Police Extra Duty 12,188,986 6,456,971 5,732,015 53.0%
Public Services 4,532,477 2,086,995 2,445,482 46.0%
Central Services 2,520,269 1,103,155 1,417,114 43.8%
Planning & Inspections 1,970,626 938,320 1,032,306 47.6%
Finance, Info Tech & Customer Services 2,557,920 1,290,442 1,267,478 50.4%
Library & Recreation 1,906,183 907,183 999,000 47.6%
Fire Department 750,445 337,957 412,488 45.0%
Assessor 572,526 262,455 310,071 45.8%
Debt Service 328,410 295,960 32,450 90.1%
Insurance 600,000 306,141 293,859 51.0%
Retirees' Health Care 1,014,820 446,741 568,079 44.0%
Street Lights 985,000 468,358 516,642 47.5%
Loss on sale of asset - 42,993 (42,993) 0.0%
Transfer to CDBG 11,000 - 11,000 0.0%
Provision for Uncollectible 10,000 10,000 - 100.0%
Transfers Out
Capital Projects Fund 344,802 344,802 - 100.0%
Police Pension Fund 620,000 101,733 518,267 16.4%
Budget Bal-Working Capital 3,020,811 - 3,020,811 0.0%
Total $ 35,412,528 $ 16,078,262 $ 19,334,266 45.4%
Reserve Balances
Contingency $ 645,254 $ 756,235
Encumbrances FY 09:
Police - Lawmen Supply Co of NJ for Bullet Proof Vests $ 30,215
Human Resources - Pike Associates for actuary services 4,000
$ 34,215
Page 150
Page 4 of 7
City of Dover
Finance Department
Monthly Report – December 2009
Water/Wastewater Fund Summary
50% of
Budget YTD Balance Budget
Revenue
Beginning Bal-Water $ 662,079 $ 659,584 $ 2,495 99.6%
Beginning Bal-Wastewater 307,112 327,614 (20,502) 106.7%
Beginning Bal-Kent Co Sewer Adj. 100,194 (397,473) 497,667 -396.7%
Water Fees 4,499,000 2,249,977 2,249,023 50.0%
Wastewater Fees 3,045,560 1,544,192 1,501,368 50.7%
Kent County Treatment Fees 3,435,390 1,590,160 1,845,230 46.3%
Water Tank Leases 293,669 127,659 166,010 43.5%
Miscellaneous 149,600 37,180 112,420 24.9%
Impact Fees - Water 475,000 182,400 292,600 38.4%
Impact Fees - Wastewater 280,000 130,900 149,100 46.8%
Total $ 13,247,604 $ 6,452,193 $ 6,795,411 48.7%
Expenses
Engineering & Inspection $ 697,783 $ 337,643 $ 360,140 48.4%
Water 458,333 199,324 259,009 43.5%
Water Treatment Plant 1,517,663 713,221 804,442 47.0%
Wastewater 988,455 433,554 554,901 43.9%
Water Meter Reading 72,533 33,804 38,729 46.6%
Construction & Inspection 410,338 206,721 203,617 50.4%
Kent County Treatment Fees 3,435,430 1,845,970 1,589,460 53.7%
Retiree’s Health Care 134,680 63,706 70,974 47.3%
Debt Service 832,951 229,680 603,271 27.6%
Intrafund Services 1,262,456 538,716 723,740 42.7%
Transfers Out
General Fund 548,020 548,020 - 100.0%
Water/Wastewater I & E Fund 700,000 350,000 350,000 50.0%
Impact Fee Reserve 110,062 - 110,062 0.0%
Budget Bal-Working Capital - Water 1,136,086 - 1,136,086 0.0%
Budget Bal-Working Capital - WW 842,660 - 842,660 0.0%
Budget Bal-Working Capital - KSA 100,154 - 100,154 0.0%
Total $ 13,247,604 $ 5,500,359 $ 7,747,245 41.5%
Reserve Balances
Contingency-Water $ 122,431 $ 120,581
Contingency-Wastewater $ 136,910 $ 134,859
Impact Fee Reserve - Sewer NO BUDGET $ 3,558,319
Impact Fee Reserve - Water $ 126,000
Bond Coverage Ratio (Covenant 1.20) 3.22 2.45
Page 151
Page 5 of 7
City of Dover
Finance Department
Monthly Report – December 2009
Electric Revenue Fund Summary
50% of
Budget YTD Balance Budget
Revenue
Beginning Balance $ 8,219,350 $ 11,415,737 $ (3,196,387) 138.9%
Sales to Customers 99,533,042 49,667,282 49,865,760 49.9%
Utility Tax 1,781,500 995,488 786,012 55.9%
Weyandt Hall Rents 186,816 101,583 85,233 54.4%
Miscellaneous Revenues 1,621,284 974,028 647,256 60.1%
Intrafund Service Receipts Water/Wasterwater 270,626 82,500 188,126 30.5%
Total $ 111,612,618 $ 63,236,618 $ 48,376,000 56.7%
Expenses
Power Supply & Generation
Power Supply $ 55,619,481 $ 28,963,202 $ 26,656,279 52.1%
Power Supply Management/Incentive 3,000,000 1,509,969 1,490,031 50.3%
Capacity Charges 13,469,528 6,852,435 6,617,093 50.9%
Rate Stabilization Credit (3,000,000) - (3,000,000) 0.0%
PJM Charges - Load 13,943,413 3,066,611 10,876,802 22.0%
Total Power Supply 83,032,422 40,392,217 42,640,205 48.6%
Plant Operations 5,798,710 2,367,073 3,431,637 40.8%
Generation Fuels 1,275,251 109,636 1,165,615 8.6%
Capacity Credits (12,133,285) (6,134,508) (5,998,777) 50.6%
PJM Credits (1,701,066) (244,647) (1,456,419) 14.4%
Total Generation (6,760,390) (3,902,446) (2,857,944) 57.7%
Total Power Supply & Plant 76,272,032 36,489,771 39,782,261 47.8%
Electric Operating Divisions
Transmission/Distribution 3,318,622 1,541,124 1,777,498 46.4%
Electrical Engineering 1,500,012 637,712 862,300 42.5%
Administration 640,535 364,305 276,230 56.9%
Meter Reading 289,103 142,386 146,717 49.3%
Systems Operations 624,520 209,952 414,568 33.6%
Utility Tax 1,781,500 995,488 786,012 55.9%
Interest on Deposits 54,500 18,601 35,899 34.1%
Retirees Health Care 567,430 256,748 310,682 45.2%
Green Energy Payment to DEMEC 137,600 67,877 69,723 49.3%
Intrafund Services 3,483,884 1,596,897 1,886,987 45.8%
Accounts Receivable Write-Offs 135,000 135,000 - 100.0%
Inventory Write-Offs 175,000 175,000 - 100.0%
Contractual Services 2030 Committee 497,250 16,884 480,366 3.4%
Debt Service 3,956,600 2,034,305 1,922,295 51.4%
Transfers Out
Electric Improvement & Extension Fund 2,500,000 2,500,000 - 100.0%
General Fund 6,758,100 6,758,100 - 100.0%
Contingency Reserve 83,500 - 83,500 0.0%
Budget Bal. - Work. Capital 8,837,430 - 8,837,430 0.0%
Total $ 111,612,618 $ 53,940,150 $ 57,672,468 48.3%
Reserve Balances
Contingency Reserve $ 1,036,069 $ 942,822
Insurance Reserve $ 395,002 $ 390,978
Rate Stabilization Reserve $ 1,718,613 $ 4,711,732
Bond Coverage Ratio (Covenant 1.25) 1.60 0.05
Megawatt Hours Sold & Purchased
Sales to Customers MWh (excluding Street Lights) 747,193 368,273
Sales per MWh $ 135.594 $ 137.569
Purchased/Generated MWh 788,808 383,409
All In MWh Supply & Generation $ 96.693 $ 95.172
Page 152
Page 6 of 7
City of Dover
Finance Department
Monthly Report – December 2009
General Capital Project Fund Summary
50% of
Budget YTD Balance Budget
Revenue
Beginning Balance - Projects $ 375,408 $ 462,693 $ (87,285) 123.3%
Transfer from General Fund for Projects 344,802 344,802 - 100.0%
Recreation Grant - 470 (470) 0.0%
State Grant - Library 4,000,000 163,057 3,836,943 4.1%
Miscelleanous Receipts - 25,000 (25,000) 0.0%
Library Bond Issue/Contributions 1,912,433 - 1,912,433 0.0%
Transfer from Library Reserve 3,000,000 - 3,000,000 0.0%
Interest Earnings 2,700 7,009 (4,309) 259.6%
Income from Sale of Assets - 29,528 (29,528) 0.0%
Total $ 9,635,343 $ 1,032,559 $ 8,602,784 10.7%
Expenditures
Fire $ 292,210 $ 222,452 $ 69,758 76.1%
Library 8,912,433 333,574 8,578,859 3.7%
Recreation - 28,734 (28,734) 0.0%
Police 73,700 33,022 40,678 44.8%
Streets 350,000 1,119 348,881 0.3%
Public Services - Administration 7,000 - 7,000 0.0%
Central Services - 544 (544) 0.0%
Total $ 9,635,343 $ 619,445 $ 9,015,898 6.4%
Reserve Balances
Capital Asset Replacement Reserve $ 242,074 $ 245,657
Library Reserve $ 3,426,400 $ 3,608,301
Parkland/Recreation $ 192,735 $ 221,575
Encumbrances & Project Carry-forwards for FY 09:
Library - Holzman Moss Architecture LLP $ 15,042
Library - Holzman Moss Architecture LLP 345,427
Recreation - Daisy Construction Basketball Court 30,000
Police - Warnock Automotive 1 Police Car equipped 21,006
$ 411,475
Page 153
Page 7 of 7
City of Dover
Finance Department
Monthly Report – December 2009
Water/Wastewater Improvement & Extension Fund Summary
50% of
Budget YTD Balance Budget
Revenue
Beginning Balance-Water 1 $ 431,400 $ 1,631,844 $ (1,200,444) 378.3%
Beginning Balance-Wastewater 1 219,375 625,152 (405,777) 285.0%
Income from Sale of Assets - 2,821 (2,821) 0.0%
Interest Earned - 23,995 (23,995) 0.0%
State Loan-Water 2,404,017 - 2,404,017 0.0%
State Loan-Wastewater 5,942,481 - 5,942,481 0.0%
Transfer from Water Operating Fund for Water 500,000 250,000 250,000 50.0%
Transfer from Wastewater Operating Fund for Wastewater 200,000 100,000 100,000 50.0%
Transfer from Impact Fee Reserve 518,230 - 518,230 0.0%
Total $ 10,215,503 $ 2,633,812 $ 7,581,691 25.8%
Expenses
Water $ 2,987,317 $ 259,280 $ 2,728,037 8.7%
Wastewater 6,539,110 123,214 6,415,896 1.9%
Water Construction 39,000 38,793 207 99.5%
Budget Bal-Working Capital - Water 309,100 - 309,100 0.0%
Budget Bal-Working Capital - Wastewater 340,976 - 340,976 0.0%
Total $ 10,215,503 $ 421,287 $ 9,794,216 4.1%
Reserve Balances
Capital Asset Replacement - Water $ 184,698 $ 208,748
Capital Asset Replacement - Wastewater $ 87,357 $ 65,545
(1) Includes FY 09 project balances that will be completed in FY 10.
City of Dover
Finance Department
Monthly Report – December 2009
Electric Improvement & Extension Fund Summary
50% of
Budget YTD Balance Budget
Revenue
Beginning Balance 1 $ 1,461,547 $ 2,625,760 $ (1,164,213) 179.7%
Beginning Balance Bond Proceeds 1 1,378,257 4,240,034 (2,861,777) 307.6%
Bond Proceeds 1,958,107 2,861,777 (903,670) 146.2%
Interest Earnings 33,700 11,474 22,226 34.0%
Transfer from Electric Revenue Fund 2,500,000 2,500,000 - 100.0%
State Reimbursement for Projects - 2,950 (2,950) 0.0%
DEMA Grant for Security System - 33,724 (33,724) 0.0%
Total $ 7,331,611 $ 12,275,719 $ (4,944,108) 167.4%
Expenses
Power Plant $ 1,254,000 $ 149,823 $ 1,104,177 11.9%
Transmission/Distribution 1,127,147 394,008 733,139 35.0%
Electrical Engineering 3,525,536 1,707,259 1,818,277 48.4%
Budget Bal. - Work. Capital 1,424,928 - 1,424,928 0.0%
Total $ 7,331,611 $ 2,251,090 $ 5,080,521 30.7%
Reserve Balances
Depreciation Reserve $ 7,991,763 $ 7,908,837
Future Capacity Reserve $ 8,900,651 $ 8,897,568
(1) Includes FY 09 project balances that will be completed in FY 10.
Page 154
Dover Police Department
Monthly Report
To
Mayor & City Council
“To Protect and Serve”
December 2009
Page 155
January 20, 2010
Honorable Carleton E. Carey, Sr., Mayor
Members of Dover City Council
City Hall
Dover, DE 19901
Mayor Carey and Council Members:
The following is the report on Police Department activities for the month of December 2009:
COMPLAINTS
Total complaints received through December 31st 36,000
numbered 28,440. This is a decrease of 973 30,133 30,482 29,632 29,413 28,440
complaints over the same time period for last year. 30,000
24,000
18,000
12,000
6,000
0
2005 2006 2007 2008 2009
CRIMINAL INVESTIGATIONS
20
Cases Reported in
December
11
10 Cases Cleared in
December
5 4 Cases Cleared from
2 2 2 Previous Months
1 1
0
0
Burglary Robbery Rape
Page 156
Report to Mayor and Council
December 2009
Page 2
QUALITY OF LIFE TASK SECTION
ENFORCEMENT ACTION ARRESTS
ABANDONED VEHICLES 0
ALCOHOL VIOLATIONS 1
ASSIST OTHER 36
WARRANTS ON FILE 0
BIKE ON SIDEWALK 0
CITY PARK VIOLATIONS 0
CRIMINAL ARRESTS 6
DRUG RELATED ARRESTS 22
LOUD MUSIC 1
MISCELLANEOUS VIOLATIONS 4
PARKING VIOLATIONS 23
COLLECTION OF DELINQUENT DCO’S 0
PEDDLER 0
PROSTITUTION 0
WANTED CHECKS/CPC’S 11
WARNINGS/TRAFFIC ARRESTS 33
FUGITIVE 14
TOTAL ARRESTS 151
TRAFFIC ARRESTS
24,000 19,224 19,969
The department issued 19,969 traffic citations through this 18,664 18,112 18,314
reporting period. This is an increase of 1,655 citations over 18,000
the number issued during the same period last year.
12,000
6,000
0
2005 2006 2007 2008 2009
TRAFFIC CRASHES
Through December 31st, Dover Police investigated *** traffic
crashes. This is a decrease of ** traffic crashes investigated
2,400
during the same period last year.
1,800
1,200
600
0
2005 2006 2007 2008 2009
Page 157
Report to Mayor and Council
December 2009
Page 3
911 CENTER
20%
During the month of December, our 911 Center handled a
911 Cell phone total of 11,087 calls averaging 358 calls per day.
Dispatchers handled 2,210 calls on the 911 cell phone
11% 911 Landline lines, an average of 72 calls per day and 1,222 on the 911
landlines, an average of 40 calls per day.
Administrative
69% Calls
CITY ORDINANCE SUMMONS 12,000 10,538
10,052 9,953
9,101
st 8,214
Through December 31 , we issued 8,214 city ordinance 7,570 7,135
summons, a decrease of 887 summons over December of 8,000 6,943
6,116
last year. *Note: of those summonses issued in December, 5,439
30 were issued for handicapped parking violations, 14 for
fire lane parking violations, 100 for false alarms (60 for 3- 4,000
5 alarms, 25 for 6-9 alarms, 10 for 10-15 alarms, and 5 for
16 or more alarms) and 8 for noise violations (5 for
vehicle violations and 3 for residence violations). 0
2005 2006 2007 2008 2009
ISSUED PAID
Listed below are the major crimes and activities that occurred during the month of December:
• On Thursday, December 03, 2009, members of the Quality of Life Section conducted a traffic stop on West Division
Street just west of North West Street. During the course of the traffic stop, the defendant was found to be in possession of
19.2 grams of crack cocaine and 17.1 grams of marijuana both packaged for sale.
• On Thursday, December 03, 2009, Dover officers conducted a traffic stop on South State Street just south of West
Division Street. When officers made contact with the defendants, they detected a strong odor of marijuana emitting from
the vehicle. A subsequent search of the vehicle found the defendants to be in possession of 234.6 grams of marijuana
packaged for sale, $1400.00 in US currency, drug paraphernalia and a .22 caliber handgun.
• On Saturday, December 5, 2009, Dover officers responded to a robbery in the area of Paul Street and Davis Circle.
Investigation revealed that one defendant agreed to meet another defendant at this location to illegally purchase
prescription pills. The first defendant then drove to the area with her two young children in her vehicle. The second
defendant pulled out a knife and demanded money. The first defendant was robbed and received a cut to her arm during
the robbery. Both defendants were arrested and the children were not hurt during the incident.
• On Monday, December 16, 2009, Dover officers responded to a report of a fire at a residence on Sackarackin Avenue. It
was reported that the elderly resident was handicapped and was unable to retreat from the residence. As officers arrived
they immediately began rescue attempts and also attempted to extinguish the fire. The resident was removed by the
officers who themselves had to escape due to the fire becoming even larger. Units from Robbins Hose arrived on scene
and were able to extinguish the fire after using additional equipment. The resident was transported to Kent General
Hospital and was released after being evaluated for smoke inhalation.
Page 158
Report to Mayor and Council
December 2009
Page 4
Major crimes and activities that occurred during the month of December continued:
• On December 22, 2009, a male subject was arrested for Unlawful Sexual Contact 1st of a 7 year old relative. He was also
arrested for failure to re-register as a sex offender when he changed his address.
• On Wednesday December 23, 2009, a sixty-six year old male victim exited his vehicle in the parking lot of Home Depot
at which time he was approached from behind by three subjects. Two of the subjects grabbed the victim and held him
while the third subject removed his wallet from his person. The subjects then fled on foot to a vehicle that was also parked
in the parking lot of Home Depot. The victim was not injured as a result of the incident.
• Between December 24, 2009 and December 25, 2009, an unknown suspect used an object to break out a window on the
south side of Mel's Tattoo's to gain entry into the business. Once inside the suspect removed an undetermined amount of
USC and a 46" flat screen television. The suspect also removed approximately 55 tattoo guns before fleeing the business.
• On Monday, December 28, 2009, two subjects were observed shoplifting items from the Boscov’s Department store. One
subject was located and detained by store security and contacted Dover Police. After the officer arrived the second
suspect, was observed on camera at the exit of Boscov’s. The officer then contacted the subject and detained him. A
loaded 9 mm handgun was then found on the second subject, as well as crack cocaine.
Respectfully Submitted,
Jeffrey Horvath
Chief of Police
Page 159
Monthly Report
December 2009
Office of City Assessor
Page 160
Assessor’s Report
Major Updates
Oct‐09 Nov‐09 Dec‐09
Assessment Change ‐$219,300 ‐$2416,200 $5,791,000
Residential Sales Ratio Report
Sales in Study Total Assessed Value Total Sale Price Ratio PRD
9 $1,213,100 $1,357,835 0.89 1.00
Ratio – Assessed Value divided by Sale Price.
PRD – Mean – A PRD above 1.03 tends to indicate assessment regressivity – high valued properties are under
appraised relative to low valued properties. A PRD below .98 tends to indicate assessment progressivity – high
valued properties are relatively over appraised.
Page 161
Assessor’s Report
Points of Interest
Scanning & Filing
‐ All new deeds are being scanned and attached to the CAMA software for easy retrieval.
‐ All appeal documents and correspondence are being scanned and attached to the CAMA software for easy retrieval.
‐ All deeds from 2006 through current day are scanned and attached to our software.
‐ Hard Copies of original property record cards are being scanned and attached to the CAMA software for easy retrieval
of previous years history.
City Wide Revaluation
‐ Tyler Technologies is finalizing the review of residential and commercial properties.
(Please see attached Project Status report from Tyler Technologies)
Page 162
City of Dover Sales Ratio Report for December 2009
PARID Address Total Assesesed Val. Sales DT Price ASR
22-Dec-09
11-Dec-09
0.68
0.87
0.99
4-Dec-09
17-Dec-09
0.82
15-Dec-09
0.95
0.91
0.80
4-Dec-09
3-Dec-09
1.26
108,000
180,000
1,500
165,000
200,500
182,215
183,665
,055
159,900
ED05-068.15-04-08.00 137
936
462
418
412
208
349 BETH
MONROE
TEA
ANN
186 N
226 PL
PART TER
TRL
MOORE
BARRISTERPL
ORTHDOWN
PENNSYLVANIA
KIRKWOOD ST
STAVE
DR
93,700
167,700
178,600
172,500
165,100
61,800
136,000
128,300
109,400
1,213,100 1,357,835 8.10
Page 163
MEMO
PROJECT STATUS
DOVER, DE
To: Cheryl Russell, Assessor
From: Steve Beccio – Project Supervisor
Date: 12/18/2009
Staff currently assigned:
Project Supervisor: Steve Beccio
Clerical Support: Nicole Colbert
Residential Final Review: Janice Kraynak; Ryan Zuck
Commercial Final review: Wes Graham; Rick Arrowood; Gynt Grube
PROJECT START UP
. Refer to Status Rpts 1/16/09 and 1/30/09.
Office space
The Assessor has provided Tyler/CLT office space within the Assessor’s office.
Address: Tyler Technologies/CLT
C/O City of Dover Assessor’s Office
P.O. Box 457
Dover, DE 19903
Phone: 302-760-4927 Fax: 302-736-4450
Photography
Photos have been attached to parcel records.
Van View has been implemented.
Routing
All maps have been routed and routing numbers have been entered into an Excel spreadsheet
for importing into IAS Total: (11,753). Planned units to date: (11,757).
Public Information
All pre list information mailers have been printed and mailed.
Approximately 9100 Residential Data mailers have been delivered to the City of Dover for bulk mailing as of
July 22nd. As of 10/09/09, 707 Data Mailers have been returned by property owners from which 84 incorrect
photos have been identified by property owners.
Press release updating public on the status of the revaluation program to be published in City of Dover’s
Quarterly News Letter within the next several weeks and will appear min the Dover Post in December.
Residential Data Collection: As of 9/25/09; (9,149) first calls had been made.
Planned units to date: (9,200)
Page 164
Total Refusals: 170 6% of Contact
Interior Refusals (Interior Information & Exterior): 1490 51.5% of Contact
Interior Refusals (No Interior Information & Exterior): 58 2% of Contact
Interior Inspections: 1175 40.5% of Contact
Estimated: 759 8% of the time
Vacant Bldg.: (259 unoccupied;13 abandoned) 272 3% of the time
No One at Home: 5224 57% of the time.
Contact: 2892 32% of the time.
Approximately 60 properties that were classed as residential on the 2008 Roll were flagged during residential
data collection as being commercial conversions. Once commercial data collection has been completed these
will have been resolved.
Commercial Data Collection: As of 11/20/09: units to date: 1205*
Planned units to date: (1205)*
Exempt Data Collection: As of 11/6202009: units to date: 425*
Planned units to date: (425)*
Residential Pre-Review: As of 11/20/2009: 9,149 units completed. Planned units to date (9,200)*
Data Entry: As of 11/20/09: 11,758 properties had been entered into the IAS World 2009 file.
Planned units to date: (11,758)*
* Planned units to date reflect numbers extracted from IAS after the 2008-2009 rollover. Apart
from the total number of occurrences of active(current) parcel identifiers, the parcel counts within the individual
categories of Commercial, Exempt and Residential were determined by counting the number of “CLASS”
occurrences; C, E, R, assuming these classifications represented parcels improved with buildings and excluded
vacant land parcels. In the end the actual number of improved parcels will differ from those assumed in the
“units to date” category above since many parcels assumed to be improved turned out to be vacant.
To avoid this confusion in the future, all vacant land parcels have been assigned the classification of
“V”. The distinction between Exempt and non-Exempt is addressed in the Land Use Code; [(LUC). ---
E00 and C00 respectively)].
Income and Expense Request: The Assessor’s Office has mailed Income and Expense forms to all
commercial properties. As of 11/20/09, 775 had been returned. Of the 774, 353 are either owner occupied or
exempt and 422 have supplied income data, of which 390 have been entered into spreadsheets that will be
utilized in developing income models.
Outstanding Issues: Resolution of lot size discrepancies. The lot size for any parcel in IAS is calculated
from the Land record and is displayed in the CALCACRES field of the Parcel record rather than being a fixed
field. There are 2,478 parcels with no land size in the CALCACRES field of IAS that do have land size records
in the Kent Co. property record data base. There are 2,451 parcels with CALCACRES in IAS that differ from
the Kent Co. records by 4% or more. The 4% was chosen as an arbitrary threshold because the Kent Co. land
record apparently rounds lot size. This threshold could be recast at a higher rate subject to the Assessor’s
review.
Additionally there are a number of parcels (473) in IAS that have no lot size nor any match in the Kent Co. GIS
data base. These have been given to the Assessor for resolution. As of 11/6/2009, approximately 1300 lot size
discrepancies have been resolved.
Land valuation will proceed. Any changes made to lot sizes in IAS by the Assessor’s office will be
communicated to Tyler so as to track changes to value.
Page 165
VALUATION
Land Formatting:
All land1 will be classified as either Primary or Residual according to whether it
meets the zoning threshold. All land less than 1 acres will be formatted in square feet otherwise in
acres.
1. That is the majority of land. Other land types to be employed; Secondary; Waterfront; Waste.
Residential land models have been tested and loaded into IAS. Residential cost factors have been
been updated and tested. Land and residential building cost have been applied to the residential
data- base and tested against the sales data- base2.
MRA(Multiple Regression)
MRA modeling has been completed and applied to the residential subject data-base. The MRA
Model was derived from an analysis of sales and plotted back to the sales data-base. The following
ratio statistics summarize the application of both Cost and MRA to the sales data-base.
Median ratio of Market Estimate and Cost
estimate to time adjusted sales price.
Mean ratio of Market estimate and Cost
estimate to time adjusted sales price. MARKET COST
Agg. Total market value of sales divided
by total value of time adjusted sales prices. Median 0.96 0.95
Total cost value of sales divided by total Mean 0.97 0.97
value of time adjusted sales price.
PRD. Price Related Differential. Mean Agg 0.96 0.95
Ratio divided by Agg ratio for both Mkt. PRD 1.016 1.013
and Cost. A measure of assessment pro- COD 6.75 8.19
gressivity or regressivity.
COD. Coefficient of Dispersion. The
average percentage deviation from the
Median ratio.
The statistics enumerated above are all well within the standards established by the IAAO.
Once final review is complete these statistics will be recalculated as there will be changes
resulting from the review.
Final review of residential values will begin the week of November 9, 2009.
Sales Database: Because of market conditions, only sales for 2008 and 2009 (mid Sept.)
will be used as the comparable sales set. It is possible that sales for the year, 2007 could be
added back to the sales base. It’s desirable to have at least 10% of the improved residential
base be sale properties and it is common in mass appraisal practice to use sales from the three
years prior to the valuation date, provided those sales are adjusted for time (market conditions).
The trend analysis done by Genie Flynn demonstrates a gradual decline in sales prices over
the period beginning January, 2007 and ending November, 2009. At issue was the determination
of how abrupt the decline has been over the three year period and public perceptions about that
decline. The evidence shows that there is no risk to accuracy by employing the 2007 sales.
Page 166
ind
MONTH AVG ASR TREND MONTH SUGG TREND DIFF
2009 NOV 0.902 1.00 NOV 1.00 0.00
OCT 0.904 1.00 OCT 0.99 0.01
SEP 0.883 0.98 SEP 0.98 0.00
AUG 0.872 0.97 AUG 0.97 0.00
JUL 0.834 0.93 JUL 0.96 -0.03
JUN 0.853 0.95 JUN 0.95 0.00
MAY 0.794 0.88 MAY 0.95 -0.07
APR 0.829 0.92 APR 0.94 -0.02
MAR 0.837 0.93 MAR 0.94 -0.01
FEB 0.87 0.97 FEB 0.93 0.04
JAN 0.89 0.99 JAN 0.93 0.06
2008 DEC 0.852 0.95 DEC 0.92 0.03
NOV 0.83 0.92 NOV 0.91 0.01
OCT 0.822 0.91 OCT 0.9 0.01
SEP 0.789 0.88 SEP 0.89 -0.01
AUG 0.819 0.91 AUG 0.88 0.03
JUL 0.773 0.86 JUL 0.87 -0.01
JUN 0.776 0.86 JUN 0.86 0.00
MAY 0.769 0.85 MAY 0.85 0.00
APR 0.787 0.87 APR 0.85 0.02
MAR 0.766 0.85 MAR 0.85 0.00
FEB 0.752 0.84 FEB 0.84 0.00
JAN 0.794 0.88 JAN 0.84 0.04
2007 DEC 0.798 0.89 DEC 0.84 0.05
NOV 0.761 0.85 NOV 0.84 0.01
OCT 0.754 0.84 OCT 0.84 0.00
SEP 0.78 0.87 SEP 0.84 0.03
AUG 0.746 0.83 AUG 0.84 -0.01
JUL 0.753 0.84 JUL 0.84 0.00
JUN 0.759 0.84 JUN 0.84 0.00
MAY 0.774 0.86 MAY 0.83 0.03
APR 0.764 0.85 APR 0.83 0.02
MAR 0.728 0.81 MAR 0.82 -0.01
FEB 0.726 0.81 FEB 0.81 0.00
JAN 0.766 0.85 JAN 0.81 0.04
SUGG TREND
1.20
1.00
0.80
Page 167
Residential Final Review: As of 12/18/2009, 9,200* residential properties have been reviewed.
Planned Units to Date: 9200
Commercial/ Exempt Final review: As of 12/18/2008: 225 Commercials; 15 Exempt
Informal Hearings: Once final review is complete, property owners will be notified of the new tentative
assessments. These letters of notification should be mailed no later than January 29, 2010.
Property owners will have the opportunity be meet informally with representatives of
Tyler Technologies, if they have questions concerning their new assessment(s).
The Archeology Museum at the corner of North St. and South Governors will be the
location for the hearings.
Action Item
• Continue final review of residential values.
• Resolve land size discrepancies.
• Complete Final Review of Commercial / Exempt properties.
Sincerely,
Steve Beccio, Project Supervisor
CC:
PMF
EHF
PM
TLP
Page 168
CITY MANAGER’S
MONTHLY REPORT
December 2009
City Manager’s Monthly Report, December 2009
Page 169
Customer Services
1,162 payments were processed online or by telephone as of December 31, 2009.
City of Dover property taxes were due August 31, 2009 and as of December 31, 2009 the delinquent
property taxes total $597,981.62. Our collection efforts include sending a delinquent statement, mak‐
ing phone calls, and enforcing the Clean Hands Act. The Inspection and Planning Departments have
been providing assistance in collecting these outstanding debts. In November the properties over one
year delinquent will be selected to process for the monition sale.
Budget and Program Development
Plan‐IT, a Microsoft Access based program, has been purchased and will be used to enter CIP projects.
Human Resources
All employees were invited to participate in a Diversity Forum to share thoughts on enhancing recruit‐
ing efforts.
Information Technology
TAC meetings held with key departments.
Parks, Recreation, & Library
The Library recorded 507 people attending 20 children’s programs.
Caroling on the Green was held with approximately 300 in attendance.
The Annual Food Drive provided food for local food banks.
Staff provided logistics for the annual First Night festivities.
Public Services
The contractual work for the Fiscal 2010 Concrete Replacement Program has been completed.
Public Utilities
Water / Wastewater and Construction crews assisted the Streets Division with the snow emergency.
Electric crews cleared snow at the Substations and Public Utilities Building .
2 City Manager’s Monthly Report, December 2009
Page 170
CITIZEN ACTION CENTER
Aug Sept Oct Nov Dec
2009 2009 2009 2009 2009
Number of Frequently Asked Questions Per Month 495 521 304 253 314
This is where citizens can view answers to some of the most asked questions. By having this information available online it
allows citizens to access the information regardless of the time; day or night.
Total Number of Complaints Registered
200
175
150
125
100
75
50
25
0
Aug‐09 Sep‐09 Oct‐09 Nov‐09 Dec‐09
Aug 09 Sep 09 Oct 09 Nov 09 Dec 09
Site Admin/Other 1 2 1 1 3
Public Utilities 3 3 1 1 1
Public Services/Public Works 2 1 3 0 1
Police 1 1 3 2 3
Planning/Inspections 84 61 38 17 14
Average Days Open
Planning and Inspections: 7 days
Police: 2 days
Public Utilities: 0.50 days
Site Administrator: 6 days
City Manager’s Monthly Report, December 2009 3
Page 171
CENTRAL SERVICES
Fleet Operations & Maintenance Costs Items on Hand with no Usage over 36 Months
$80,000 140 $1,000,000
$70,000 120
Total Work Orders
$60,000 $800,000
100
Total Dollars
$50,000
80
$40,000 $600,000
60
$30,000
40
$20,000 $400,000
$10,000 20
$0 0 $200,000
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Dec- Jan- Feb- Mar - Apr - May- Jun- Jul- Aug- Sep- Oct - Nov- Dec-
08 09 09 09 01 09 09 09 09 09 09 09 09 08 09 09 09 09 09 09 09 09 09 09 09 09
Tot al Dollars Total Work Orders Electric Water General
Work Orders: 103 Electric: $456,902.00
Fleet Maintenance: $ 181.04 (excludes Melvin’s Sunoco) Water: $ 24,333.21
Fuel: $42,529.45 General: $ 46,968.52
Stock Purchases by Fund Contingency & Warehouse Stock
$4,500,000 2,700
2,600
$425,000
$4,000,000 2,500
2,400
$325,000
Total Line Items
$3,500,000 2,300
Total Dollars
2,200
$225,000 $3,000,000 2,100
2,000
$125,000 $2,500,000 1,900
1,800
$2,000,000 1,700
$25,000
Dec Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec
Dec- Jan- Feb- M ar- Apr- M ay- Jun- Jul- Aug- Sep- Oct - Nov- Dec-
08 09 09 09 09 09 09 09 09 09 09 09 09
08 09 09 09 09 09 09 09 09 09 09 09 09
Electric Water General Tot al Dollar Value Tot al Line Items
Electric: $76,371.18 Total Dollar Value: $3,447,300
Water: $ 2,567.77 Total Line Items: 1,996
General: $ 7,582.54
Major Program Updates
MEASURE DECEMBER 2009 DECEMBER 2008 DIFFERENCE
Issue Effectiveness (>90%)
How often the warehouse has what cus‐
100% 99.6% 0.36%
tomers need when it’s needed.
[issues / (issues + back orders)] * 100
Turn Over Rate (4‐5 per yr.)
Indicates that the material stocked is the 1 every 43.08 years 1 every 11.55 years 31.53 years
material being used.
Bids for non‐inventory items converted to
5 of 5 Bids 20 of 20 Bids
purchase orders within timeframe ‐
100% 100%
(Quantity and Percentage)
Sealed bids prepared, received & distrib‐
20 of 20 Bids 30 of 20 Bids
uted within 7 working days of receipt ‐
100% 100%
(Quantity and Percentage)
Scheduled Preventative Maintenance
20 of 30 appointments kept 24of 24 appointments kept
appointments being kept. (Quantity and ‐32.4%
66.6% 100%
Percentage)
Mail receiving lowest discounted rate 29,938 pieces 29,306 pieces
0.03%
(Quantity and Percentage) 96.9% 96.8%
Routine work orders completed within 5 21 work orders completed 31 work orders completed
2.07%
days (Quantity and Percentage) 95.4% 88.5%
Emergency work orders completed within 1 work order completed 1 work order completed
‐
2 days (Quantity and Percentage) 100% 100%
4 City Manager’s Monthly Report, December 2009
Page 172
CUSTOMER SERVICES
WORK ORDERS PROCESSED EXTENSIONS OF CREDIT
720 738
800 708 698
3,500 3,164 657
700 621
557 556 568
3,000 600 535 542
2,500
1,875 1,848
500
1,784 1,803 1,841
1,737 352 356
2,000
1,519 1,581 1,487 1,516
1,382
400
1,355
1,500 300
1,000 200
500 100
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2008 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2008 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009
Write‐Offs / Electric & Trash Bills
The electric write‐off for outstanding electric bills with dates ranging mainly from October 2007 until December 2007 . The
proposed write‐off of $23,844.90 includes $1,342.16 from accounts that filed for bankruptcy. The $23,844.90 is the second
write‐off for Fiscal 2010 and is .10 percent of the revenue ($23,096,594) for the write‐off period. In other words, the City
collected 99.90% of all bills for the write‐off period. For every $100 dollars of revenue the City billed in the write‐off period,
$0.10 was not collected.
The trash write‐off for outstanding trash bills with dates ranging mainly from October 2007 until December 2007. The
proposed write‐off of $527.24 includes $17.55 from accounts that filed bankruptcy. The $527.24 is the second write‐off for
Fiscal 2010 and is $0.18 percent of the revenue ($291,469) for the write‐off period. In other words, the City collected 99.82% of
all bills for the write‐off period. For every $100 of revenue the City billed in the write‐off period, $0.18was not collected.
According to the APPA, the industry standard for collections among publicly held utilities of similare size is 99.74% of total
electric revenue. The accounts are currently assisgned to our collection agency and will remain there even when they have
been written off. A complete list of accounts is available upon request.
FY 2010 FY 2009
Major Program Updates Dec 2009 Dec 2008 Difference
Year‐to‐Date Year‐to‐Date
Number of Customers Served 22,794 29,146 (6,352) 148,576 165,833
Final Bills 529 581 (52) 3,813 3,856
Estimated Bills 150 145 5 850 970
Penalties Posted $ 17,002 $ 17,479 $ (477) $ 109,732 $ 106,456
Extensions of Credit ‐ Amount Extended $ 134,521 $ 127,116 $ 7,405 $ 779,572 $ 957,359
Balance Transfers $ 460 $ 10,303 $ (9,843) $ 23,838 $ 40,522
Utility Collections $ 15,768 $ 177,184 $ (161,416) $ 133,533 $ 363,847
Special Assessments $ 110 $ 417 $ (308) $ 32,446 $ 2,203
Miscellaneous Billings $ 235,586 $ 174,773 $ 60,813 $ 746,088 $ 395,737
CNP through Disconnect Collars ‐ 15 (15) 98 174
Court Cases ‐ ‐ ‐ ‐ ‐
Tamperings 3 12 (9) 21 18
Taxes Levied $ ‐ $ 27,612 $ (27,612) $ 9,821,008 $9,624,085
Billing Adjustments $ 103 $ 1,278 $ (1,175) $ 1,278 $1,278
Total Taxes Collected $ 101,959 $ 139,860 $ (37,902) $ 9,275,549 $8,936,170
Taxes Outstanding $ 496,126 $ 458,831 $ 37,294 $ 458,831 $458,831
Payments in Lieu $ 1,500 $ ‐ $ 1,500 $ 9,000 $20,000
Billing Accuracy (on schedule billings) 99.9% 99.0% ‐ 99.4% 99.0%
Bills Published on Schedule 99.9% 99.9% ‐ 99.2% 99.8%
Meters Read on Schedule 99.9% 99.9% ‐ 99.9% 99.9%
Customer Satisfaction Rating 99.8% 99.7% ‐ 99.7% 99.7%
Deliquent Accounts Collected 99.7% 99.7% ‐ 99.7% 99.7%
City Manager’s Monthly Report, December 2009 5
Page 173
HUMAN RESOURCES
Customer Service Contacts Payroll Hours
300 9,000
8,000
250
7,000
200 6,000
5,000
150
4,000
100 3,000
2,000
50
1,000
0 0
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
08 09 09 09 09 09 09 09 09 09 09 09 09 Dec Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec
08 09 09 09 09 09 09 09 09 09 09 09 09
Citizens Assisted 30 25 20 25 68 75 75 60 50 41 73 54 83
Employees Assisted 65 75 37 70 97 150 80 70 65 59 84 91 62 Overtime 1,564 3,29 1,556 1,412 1,602 1,064 1,375 1,977 1,196 1,727 1,145 1,549 3,543
Applications Processed 0 0 35 0 2 0 0 0 125 1 15 0 105 Sick 2,018 4,83 2,173 3,32 1,969 2,115 2,06 1,776 1,470 1,584 1,473 1,241 1,763
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Category Total
08 09 09 09 09 09 09 09 09 09 09 09 09
*
Caucasian 343 345 344 343 342 342 332 331 327 324 325 323 322 N/A
*
Minorities 64 61 60 59 59 61 63 62 62 60 60 61 61 N/A
Hired 1 2 1 ‐ ‐ 2 ‐ ‐ ‐ 1 2 1 1 11
Terminated/Resigned/
‐ 2 3 2 1 ‐ 1 2 4 6 1 2 2 26
Retired
**
Promoted ‐ ‐ ‐ ‐ ‐ ‐ 1 1 ‐ 1 ‐ 1 ‐ 4
Jobs Posted ‐ ‐ 1 ‐ 1 ‐ ‐ ‐ 1 1 1 ‐ 3 8
Workers Comp. Injuries 4 2 3 6 3 2 6 4 3 3 1 1 ‐ 38
Workers Comp. Hours 553 385 64 17 126 350 194 323 417 283 103 25 26 2,866
Insurance Claims 2 1 6 2 6 7 4 5 9 1 2 5 2 48
*A review has been completed to ensure the accuracy of the Caucasian and Minority employees. The figures for June 2009 reflect the revised and updated
numbers. Workers’ Comp. hours may not be the result of injuries that occurred during the current month. ** Employee was promoted in July, however not
indicated on report.
Full‐time Employees: 367
Part‐time Employees: 16 (4 Pitts Center, 1 Recreation, 11 Library)
Numbers do not reflect, temporary, seasonal, relief fire dispatchers, committee or council members.
Jobs Posted: T & D Engineering Coordinator, Storekeeper/Buyer II and Librarian II, Head of Adult Services
Employee (s) Hired: Police Officer
Employee (s) Retired: 2 Police Officers
Unfilled/Open Positions Jul Aug Sep Oct Nov Dec
By Department 09 09 09 09 09 09
Public Utilities 5 5 9 8 8 8
Public Services ‐ ‐ ‐ 1 1 2
Police 1 1 3 3 3 3
All Other Departments 6 8 8 8 9 9
Totals 12 14 20 20 21 22
* Individuals on terminal leave (not included in Chart) : Library‐1; Public Services‐1
One vacant position filled with temp position (included in chart): Central Services
6 City Manager’s Monthly Report, December 2009
Page 174
HUMAN RESOURCES
Feb Mar Apr May June July Aug Sep Oct Nov Dec
Bonus Program Category Total
09 09 09 09 09 09 09 09 09 09 09
Stop Program‐Sensibly Taking Off
8 11 12 13 8 17 4 20 57 ‐ 13 163
Pounds(weigh‐ins)
Pays‐Program Awarding Your
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Suggestions (submissions)
On the Case‐Cost And Savings
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Excavation (submissions)
Caught Doing it Right‐Promotes
employees productivity & creativity 1 ‐ 6 ‐ ‐ 7 ‐ 1 2 2 2 21
(submissions)
Breathe Program‐Rewards for ending
‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 ‐ ‐ 2 3
tobacco use (submissions)
Ducs in a Row‐Doing Useful Community
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Service (submissions)
Workers Comp Injuries
7
6
5
4
3
2
1
0
Dec‐ Ja n‐ Feb‐ Ma r‐ Apr‐ Ma y‐ Jun‐ Jul ‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐
08 09 09 09 09 09 09 09 09 09 09 09 09
Public Utilit ies Public Services Police All Other Dept s
Public Utilities: 0 Public Services: 0 Police: 0 All Other Depts: 0
Workers Comp Hours
600
500
400
300
200
100
0
Dec‐ Jan‐ Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐
08 09 09 09 09 09 09 09 09 09 09 09 09
Public Ut ilities Public Services Police All Ot her Depts
Public Utilities: 0 Public Services: 25 Police: 0 All Other Depts: 1
City Manager’s Monthly Report, December 2009 7
Page 175
INFORMATION TECHNOLOGY
Service Requests Resolved Citizen Action Center
500 150
118
118
123
125 123
400 102
102
100 81
81 73
300 73
224 226 75
219 212 203 216 211
40
36 53
190
43
178
43 53
162 161
36
36 40
200 50 53 41
132
51 36
123
57
57 36
100
25
0
0 Dec- Jan- Feb- M ar- Apr- M ay- Jun- Jul- Aug- Sep- Oct- Nov- Dec-
08 09 09 09 09 09 09 09 09 09 09 09 09
Dec- Jan- Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec-
08 09 09 09 09 09 09 09 09 09 09 09 09 New Issues Customers w/ New Issues
Supported PCs CityofDover.com Visitors
500 100,000
77,138
450
400
66,744
352
65,415
350 345 348 342
333 75,000
60,065
350 318
287 291 294 295 295 295
53,304 52,462
50,109
300
45,740 47,989 47,278
44,905 45,054
250
50,000
200
150
*
100 25,000
Dec‐ Jan‐ Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ ‐Dec ‐Jan ‐Feb ‐Mar ‐Apr ‐May ‐Jun ‐Jul ‐Aug ‐Sep ‐Oct ‐Nov ‐Dec
08 09 09 09 09 09 09 09 09 09 09 09 09 08 09 09 09 09 09 09 09 09 09 09 09 09
*Moved the site from Linux to larger Windows resource. Unable to obtain stat for
month of July.
Performance Indicators Current Month Last Month Same Month Last Year
iSeries Availability 100.0% 100.0% 100.0%
Server Availability 100.0% 100.0% 100.0%
Programming Rqsts Completed 15 9 13
AS/400 connections 4% 34% 37%
concurrent/authorized users
PCs Supported 342 352 287
Scheduled PCs Replaced ‐ ‐ ‐
Servers Supported 16 16 16
People Trained 9 34 25
(A vailability statistics based o n 7:00 a.m. to 5:00 p.m. M -F)
8 City Manager’s Monthly Report, December 2009
Page 176
PARKS, RECREATION & LIBRARY
Library
Adult Services Children Services
3500 1200
3000
1000
2500
800
2000
600
1500
400
1000
500 200
0 0
Dec- Jan- Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Dec- Jan- Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec-
08 09 09 09 09 09 09 09 09 09 09 09 09 08 09 09 09 09 09 09 09 09 09 09 09 09
Reference Reader's A dviso ry Outreach Electro nic A ssistance Reference Reader's A dviso ry Outreach Electro nic A ssistance
Reference: 150 Reader’s Advisory: 33 Reference: 49 Reader’s Advisory: 34
Outreach: 0 Electronic Assistance: 143 Outreach: 124 Electronic Assistance: 11
CIRCULATION DEC 09 FYTD 10 DEC 08 FYTD 09
Dover residents 13,335 96,240 15,749 105,629
Kent residents* 12,172 92,675 15,575 101,862
Non‐county residents 976 7,148 1,254 8,187
REGISTRATIONS
Dover residents 155 1,387 168 1,872
Kent residents* 97 882 100 896
Non‐county residents 20 107 4 88
OTHER
Visiting Patrons 29,111 199,659 30,052 204,116
Meeting Room Usage 340 1,280 120 920
Photocopier Usage 1,491 9,788 1,042 7,592
Dial‐A‐Story 832 8,712 999 9,104
Computer Usage 4,103 29,740 4,615 29,836
Holds (Total) 3,031 32,948 4,026 29,685
*Breakout of Kent County Residential Statistics
Circulation Registrations
Harrington: 100 Harrington: 1
Smyrna: 775 Smyrna: 4
Milford: 81 Milford: 2
Outside City Limits: 13,590 Outside City Limits: 128
Total Registered Users: (Card Holders)
City: 14,776 County: 12,775 New Castle & Sussex Counties: 821
Other: 4,520
Other Points of Interest:
Interlibrary: 2,550 items loaned out Technical services: 1,150 items added
2,360 items borrowed 515 items deleted
Volunteers: 65.5 hours of service completed
City Manager’s Monthly Report, December 2009 9
Page 177
Parks and Recreation
Recreation Revenue Recreation Revenue Breakdown
$30,000
$22,518
$ 25,000 $21,826
$20,131
$25,000
$15,970
$ 20,000 $20,000
$12,109 $12,413
$15,000
$10,734
$ 15,000
$9,160
$7,919
$10,000
$7,447
$6,466
$ 10,000
$5,343
$3,829
$5,000
$ 5,000
$0
Dec- Jan- Feb- M ar- Apr- M ay- Jun- Jul- Aug- Sep- Oct- Nov- Dec-
$0 08 09 09 09 09 09 09 09 09 09 09 09 09
Dec- Jan- Feb- M ar- Apr- M ay- Jun- Jul- Aug- Sep- Oct - Nov- Dec-
08 09 09 09 09 09 09 09 09 09 09 09 09 General Rental Payments Sport s Leagues Trips
General: $1,885 Rental Payments: $5,844 Sports: $1,419
Leagues: $1,975 Trips: $1,290
RENTALS DECEMBER 09 FYTD 10 DECEMBER 08 FYTD 09
Baseball/Softball Field Rentals* - 108 - 158
Dover Park Pavilions (2) - 18 - 24
Multipurpose/Field Hockey Field Rentals* - 44 - 28
Recreation Center – Dover Park 11 69 11 81
Silver Lake Pavilions (2) / Schutte (1) 1 30 1 25
Soccer Field Rentals* - 10 - 14
Stage 3 16 3 13
*These numbers reflect groups that utilized our facilities during DECEMBER.
PROGRAM ATTENDANCE* DECEMBER 09 FYTD 10 DECEMBER 08 FYTD 09
Soul to Sole Line Dancing 2 10 Not Offered
*These numbers reflect activities that ended/ took place in DECEMBER at Dover Park. (Not included on the JWP report).
Pitts Center ‐ Total Program Attendence FREE Open Gym Registration Cards* ‐ through 12/31/2009
Total Cards Issued: 2,980
8,873
City Residents: 1,405 ‐ (47%)
10,000
8,000
Non‐City Residents: 1,575 ‐ (53%)
8,000 ‐ Kent County: 1,1233 ‐ (41%)
5,935 6,082 ‐ Sussex County: 106 ‐ (4%)
# of people
‐ New Castle County: 76‐ (3%)
4,352
6,000
3,975
3,335
‐ Out of State: 160 ‐ (6%)
2,966 2,761 2,492 2,431
4,000
1,175 1,315
*The cards permit entrance to the facility during sched‐
2,000 uled Public Gym Periods at no charge.
0
Dec- Jan- Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec-
08 09 09 09 09 09 09 09 09 09 09 09 09
10 City Manager’s Monthly Report, December 2009
Page 178
PUBLIC SERVICES
Administration
Administrative review and inspection services continued on all residential and commercial developments.
The following residential subdivisions are in various phases of construction:
Oak Shadows Emerald Pointe Lexington Glenn
Village of Westover (Phase VI) Seskinore Nottingham Meadows
Stoney Creek (Phase II) Clearview Meadows Village of Cannon Mill
Somerset Park Patriot Village Eden Hill (Residential)
Farthing Woods
Sanitation
Monthly Total Refuse (Tons) Sanitation Hours
1,106 1,118 1,078 1109
1155
1,200 1,044 1,032 1,012 1,041 1200
987
893 928
1,000 831 833 1000
777
778
800 800 706
531
600 474 442
412 410 426 419 600 486
358 376
319 318 401
400 240 224 400
200
200
38.0 63
20
‐ 8
0
Dec Jan Feb Mar April May June July Aug Sept Oct Nov Dec Bulk Collection Mechanized Hand Trash Collection Container Electronic Goods
08 09 09 09 09 09 09 09 09 09 09 09 09 Collection Repair/Delivery Pickup
Bulk Automated December 09 December 08
DECEMBER 09 FYTD10 DECEMBER 08 FYTD 09
Tons Dry Waste Collected 83.81 901.79 86.42 913.26
Tipping Fee Savings Realized $1,634.30 $17,584.91 $1,685.19 $17,808.56
Trips to DSWA Sandtown Landfill 241 1,451 291 1,612
Total Tonnage to DSWA 1,305.16 8,133.56 1,464.33 8,517.34
90‐Gallon Containers Delivered 33 186 26 216
300‐Gallon Containers Delivered ‐ 22 6 48
Total Man Hours Containers Delivered 38 224 63.0 337
CURBSIDE TOTAL # OF HOUSEHOLDS
WEIGHT/LBS. % PICKED UP
RECYCLING STATS HOUSEHOLDS PICKED UP
Nov 2009* 15,376 10,118 214,202 66%
*Numbers are reported one month behind
City Manager’s Monthly Report, December 2009 11
Page 179
DECEMBER 09 FYTD10 DECEMBER 08 FYTD 09
Signed Installed 4 111 39 211
Signs Repaired 19 80 20 71
Curbs Painted Yellow (feet) ‐ 240 ‐ 2,491
New Post Installed 3 100 6 23
Storm Catch Basins Cleaned ‐ 59 ‐ ‐
Storm Catch Basin Cleaning (Hrs.) ‐ 11 ‐ ‐
Hot Mix Patching (Tons) ‐ 651 0 283
Cold Mix Patching Hrs.) 32 132 17 151
Concrete Work (Hrs) ‐ 150 ‐ 216
Concrete Patching (Cubic Yards) ‐ 12 ‐ 25
Street and Alley Maintenance (Hrs) 157 862 17 808
Street Sweeping (Miles) 159 6,033 620 5,942
Street Sweeping (Cubic Yards) 37 1,033 72 1,110
Leaves Collected (Cubic Yards) 1,300 10,586 2,425 9,625
Leaf Collection (Miles) 830 5,134 1,666 5,282
GROUNDS
Arborist Crew DECEMBER 09 DECEMBER 08
Trees Removed 16 18
Trees Trimmed 38 37
Stumps Removed 1 ‐
Root Pruning 18 ‐
Trees Planted 6 12
Beautification Crew
– Planted thousands of tulips, hyacinths and daffodils in the annual beds and containers.
Grounds Maintenance/Mowing Crews
– Worked on leaf collection in the parks and around City buildings.
– Snow removal from sidewalks after an 18.5” snowfall on December 18‐20, 2009.
Special Projects Crew
– Planted at total of six trees; one as a replacement on Loockerman Street, two at the Firehouse and three
on North Bradford Street.
– Assisted with placing Christmas trees on the lakes and set up for First Night.
– Assisted with planting of spring bulbs.
– Applied nine gallons of Roundup herbicide on weeds in flower beds and mulched areas on the Plaza.
12 City Manager’s Monthly Report, December 2009
Page 180
LIFE SAFETY
Inspections DECEMBER 09 FYTD10
Fire and Safety Inspections 11 154
Fire Code Inspections 63 411
Certificate of Occupancy 7 56
Office 122 685
Meetings 42 253
Plan Review 60 349
Training ‐ 362
Fire Education 28 42
Fire Investigations 45 175
Accidental $190,000 $341,000
Incendiary ‐ $132,500
Undetermined $10,000 $29,000
PERMITTING AND LICENSING
Permits Issued DECEMBER 09 FYTD10 DECEMBER 08 FYTD 09
Building Addition/Renovation Permits 24 270 32 294
Building Permits 2 59 10 66
Demolition Permits 3 24 2 15
Fence Permits ‐ 48 2 68
Fire Prevention Permits 7 42 12 54
Mechanical Permits 12 227 25 330
Plumbing Permits 27 291 28 372
Sign Permits 11 136 21 119
Swimming Pool Permits ‐ 1 ‐ 9
Business Licenses 56 1,132 24 1,618
Merchant Licenses 2 271 1 327
Contractor Licenses 20 688 4 869
Lodging House Licenses 24 25 20 21
Mobile Homes ‐ 346 6 358
Public Occupancy 165 184 175 194
Rental Dwelling 664 766 598 713
BUILDING INSPECTIONS
Permits Issued DECEMBER 09 FYTD10 DECEMBER 08 FYTD 09
Building 393 2,390 298 1,726
Plumbing/Mechanical 161 1,730 217 1,226
Certificate of Occupancy 16 158 18 144
City Manager’s Monthly Report, December 2009 13
Page 181
PUBLIC UTILITIES
ELECTRIC
System Peak Total System Load
161.1
180.0 100,000
147.2 90,000 78,500
133.8
160.0
122.0 127.6 71,603
64,790 66,117
140.0 80,000
107.5 111.5 109.4 106.0 110.2
60,634 63,350
103.7
57,892 58,013 59,833
99.1
55,311 56,420
120.0 70,000
98.2
53,597 54,029
100.0 60,000
80.0 50,000
60.0 40,000
40.0 30,000
20.0 20,000
0.0 10,000
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
08 09 09 09 09 09 09 09 09 09 09 09 09 08 09 09 09 09 09 09 09 09 09 09 09 09
Outages Customers of Gained/Lost
20 25,000
35 32
18
16 20,000 30
14 23
25
Outages Customers
12 15,000
20 17 17
10
15 15 15
8 10,000 15
10 11
6
10 7 7
4 5,000 6
4
2 5
0 0 0
Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
08 09 09 09 09 09 09 09 09 09 09 09 09
08 09 09 09 09 09 09 09 09 09 09 09 09
Outages Customers
Outages: 7 Customers: 152
ELECTRIC OUTAGE REPORT
# OF
OUTAGE # DATE TIME OUT TIME IN LOCATION DEVICE ACTION
CUST
1 12/2 08:04 PM 10:30 PM 113 S Governors Boulevard Blown Fuse 93 Replaced Fuse
2 12/09 07:50 AM 08:33 PM 2054 Horsepond Road Blown Fuse 26 Replaced Fuse
3 12/14 10:14 AM 12:35 PM 1133 S Little Creek Road Blown Fuse 24 Replaced Fuse
4 12/15 08:12 PM 11:08 PM 3634 S Little Creek Road Bad Transformer 2 Replaced Transformer
5 12/22 03:52 PM 08:07 PM 966 Sunset Terrace Bad Triplex 4 Replaced Wire
6 12/26 01:19 PM 04:28 PM 1100 Janes Road Limb on Line 1 Removed Limb
7 12/30 11:54 AM 01:37 PM 1360 Donas Landing Blown Fuse 2 Replaced Fuse
14 City Manager’s Monthly Report, December 2009
Page 182
ENGINEERING SERVICES
Completed Projects Active Projects / % Completed Projects in Design / % Completed
Schoolview Development Grandview Mobile Home Park ‐ 80% Wawa Bay Court Plaza Redesign ‐ 90%
South Shore Drive Lexington Glenn ‐ 80% Cahne Medical Building ‐ 0%
Clearview Phase 1, 2, 3 ‐ 50% North Street Improvements ‐ 50%
Tall Pines, Dover Kenton Road ‐ 10% Cannon Mill, Phase III ‐ 100%
Nottingham Meadows ‐ 50% Chick Filet ‐‐0%
Cannon Mill, Phase II ‐ 90% Wawa Court Street ‐ 100%
Kent Acres Rehab ‐ 95% Kesselring Farm ‐ 100%
SR1/SR9 Rebuild ‐ 1% Culligan Complex, Saulsbury Road ‐ 40%
Stover Professinal Center 508 ‐ 90% Dover Transit ‐ 0%
Dove View Development ‐ 30% 1600 N. Little Creek Road ‐ 0%
Governors Avenue Phase I ‐ 90% Spence’s Bazzar ‐ 0%
Patriot Village ‐ 20% Brentwood ‐ 100%
State of Delaware I/T ‐ 99% Kent General Hospital ‐ 100%
O’Brien Building ‐ 90% Kent 8 Building ‐ 100%
DAFB Feeder ‐ 85% Walgreens Dupont Highway ‐ 0%
Eden Hill Residential ‐ 15% Silver Lake Blvd Townhouses ‐ 100%
12707‐12206 Tie ‐ 50% W. Riley Brown ‐ 0%
Cross Gates Development ‐ 50% Governors Lighting Fulton‐State St ‐ 100%
Buchanon Acres ‐ 50% Dover Crossroads ‐ 100%
Village of Blue Hen ‐ 10% CVS Forrest Street ‐ 100%
Fairfield Farms Lighting ‐ 100%
Candlewicke Lighting ‐ 100%
Garrison Fiber ‐ 0%
Vernon Woods ‐ 40%
The Arbors Senior Center ‐ 0%
Eden Hill Commercial ‐ 10%
Farthing Woods ‐ 100%
L & W Insurance ‐ 100%
Fiber‐Robbins Hose ‐ 0%
Fiber‐DEDO ‐ 100%
Public Library ‐ 0%
Fiber‐ Dover Downs ‐ 10%
Fiber‐Garrison ‐ 10%
Riley Brown ‐ 5%
Dover Animal Hospital ‐ 100%
McDonalds ‐ 0%
TRANSMISSION AND DISTRIBUTION
Underground Work % Completed Overhead Work % Completed
Clearview Meadows Ongoing Overhead Maintenance Ongoing
Lexington Glenn Ongoing Maintenance of City lighting Ongoing
Nottingham Meadows Ongoing
Capitol Park upgrade to underground 85%
Seskinore Development 95%
Ridgley Street Storage 60%
Stover Professional Center 90%
Kent Acres 99%
City Manager’s Monthly Report, December 2009 15
Page 183
MAJOR PROGRAM
DEC 09 DEC 08 DIFFERENCE FY10 YTD FY09 YTD
UPDATES
Tree Trimming 177 209 32 1143 1166
5‐Yr Pole Testing &
Program Not Active
Repair Program
Annual Infra‐Red
Completed
Testing
Annual Substation Oil
Completed
Testing
Track the amount of
spills, clean‐ups, equip.
‐ ‐ ‐ 15 20
sales, & environmental
disposals.
New Professional Work
Chop Saw Safety &
Practices & Procedures; ‐ ‐ ‐ ‐
Usage
Implemented
Universal
safety/security training,
as mandated by federal, ‐ ‐ ‐ ‐ ‐
state, & local
regulations, completed
Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
METER STATS 08 09 09 09 09 09 09 09 09 09 09 09 09
Radio Read Meter Installations 36 20 43 42 38 53 53 122 119 41 50 64 52
Meters Tested 39 1 107 50 59 ‐ ‐ 235 97 159 57 96 170
Meters Junked ‐ ‐ 59 ‐ ‐ ‐ ‐ 86 ‐ 102 32 ‐ 74
Meters Removed 15 2 22 9 11 10 10 12 8 8 0 13 4
Meter Changes 10 2 24 13 20 24 24 91 77 13 13 36 35
New Services 11 11 8 15 10 16 16 13 23 13 21 15 5
Services Retired 1 ‐ ‐ 2 ‐ 1 1 4 ‐ 5 1 ‐ 5
Switching schedules 14 9 10 10 14 12 20 7 3 6 4 11 2
Work orders 289 289 263 263 277 279 526 861 1,047 303 286 1,107 249
Miss Utility tickets called back 1,884 1,788 1,713 1,713 2,283 1,947 2,277 2,022 1,724 2,416 2,118 1,370 1,478
Tickets located 285 1,774 1,701 1,911 2,256 2,145 2,206 912 873 1,638 1,388 1,091 739
SUBSTATION RELAY
Substation Status
Lebanon Relay Upgrade
Mid City Foundation Construction
DAFB Relay Synchronizing
16 City Manager’s Monthly Report, December 2009
Page 184
WATER/WASTEWATER
Water Production/Billed Consumption/Flow to Kent County
200
150
Million Gallons
100
50
0
Dec 08 Jan 09 Feb 09 Mar 09 Apr 09 May 09 June 09 July 09 Aug 09 Sep 09 Oct 09 Nov 09 Dec 09
Total Water Production Billed Consumption Total Flow to Kent County City Readings
Water Production: 101,207,000 Billed Consumption: 113,106,000
Total Flow to Kent County: 154,603,000 * City Readings: 178,066,000
*Billing behind one month
DECEMBER 09 DECEMBER 08
Water Production – Daily Average 3,264,742 3,758,161
Fire Hydrants – Flushed ‐ ‐
Fire Hydrants – Tested 1 ‐
Final Readings 98 95
Cutoffs 20 45
Turn‐on’s 10 23
New Inspections 6 13
Curb Boxes Located 51 68
Curb Boxes Adjusted 3 2
Water Service Lines Repaired 1 4
Water Meters Repaired 30 21
Radio Technology Installations 8 475
New Meters Added 9 4
Total Water Meters in City Distribution System 13,764 13,582
DECEMBER 09 DECEMBER 08
L.F. Sewer Lines Flushed 82,352 104,305
Sewer Lines Inspected ‐ ‐
Feet Sewer Mains Videotaped ‐ 295
Manholes Inspected 468 602
Manholes Cleaned 468 584
City Manager’s Monthly Report, December 2009 17
Page 185
Major Program Updates DECEMBER 09 DECEMBER 08 DIFF FY10 YTD FY09 YTD
State and Federal Violations 0 violations 0 violations ‐ ‐ ‐
Water Quality Complaints 5 3 2 350 382
Infrastructure Repairs (Water 28 repairs 40 repairs
4 repairs reported 0 repairs reported 4
Distribution) reported reported
Infrastructure Repairs 15 repairs 25 repairs
1 repairs reported 0 repairs reported ‐1
(Wastewater Transmission) reported reported
Water System Flushing
0% 0% 100% 100%
Completed (on schedule)
Percentage of Flow Sent to Kent
County vs. Gallons Billed 130% 87% 43% 100% 85%
(inflow/Infiltration monitoring)
Plan Review Completed within
13 plans 6 plans 7 plans
30 days of Submission 98% 96%
100% 100%
Inspection Response within 48
100% ‐ 100% ‐
hours of Request
18 City Manager’s Monthly Report, December 2009
Page 186
CITY PLANNER’S
MONTHLY REPORT
Public Services Group
P.O. Box 475
Dover, DE 19903
Phone: (302) 736-7010 Fax (302) 736-4217
December 2009
PERSONNEL
On December 15, 2009 Dawn Melson-Williams, Janelle Cornwell, and Michael Albert attended the DE/MD
APA conference committee meeting.
EDEN HILL FARM TND
In December, construction of the townhouse units continued in the Residential District of Eden Hill Farm
Traditional Neighborhood Design. Four townhouses received Temporary Certificates of Occupancy, and one
received a final Certificate of Occupancy. Staff began review of building permits of another six-pack of two-
story townhouses known as the Mediterranean during late December. In December, there was no specific
activity associated with the Professional Office, Medical & Financial District. The Revised Implementation
Plan (March 2009) for Neighborhood Commercial District is in the Check Print review process working
towards Final Plan approval; no plan resubmissions for review were received in December.
COMPREHENSIVE PLAN IMPLEMENTATION
Comprehensive Rezoning Project 2009/Comprehensive Plan Amendments: After the City Council adopted the
Comprehensive Plan Amendments and 2009 Comprehensive Rezoning, staff prepared notices of decisions and
the various final publication documents.
Other Activities: In December, Planning Staff began to focus efforts on other short term implementation items
identified in the 2008 Comprehensive Plan, including working with the Economic Development Office on the
Garrison Oak Conceptual Subdivision Plan. This was slated to be reviewed by the Planning Commission in
December but was delayed until January 2010 due to weather conditions. (The Planning Commission Meeting
in December was cancelled.) Staff also began to make preparations for the beginning of updating the
Environmental Protections within the Zoning Ordinance, a process which will begin in January.
CODE ENFORCEMENT
Case Type # cases # cases % staff % staff
current month YTD initiated initiated YTD
current month
No valid rental permit 4 122 100% 96%
No valid building permit 1 60 0% 90%
Tall grass and weeds 1 648 0% 75%
Unregistered vehicle 2 67 100% 78%
Abandoned vehicle 10 92 50% 71%
Annual Housing 196 958 98% 97%
Inspection
Page 187
CO Inspection – 0 88 0% 100%
Planning
Property Maintenance – 38 755 76% 71%
Exterior
Electric Termination 19 267 0% 1%
Dover Code of 45 1049 80% 75%
Ordinances
Zoning 9 282 78% 84%
Basketball goal 1 30 0% 80%
Total Cases 326 4433
Total # of Inspections 717
COMMUNITY DEVELOPMENT
FISCAL YEAR 2008
Dover Interfaith Ministry to the Homeless
Site plans and architectural and structural proposals have been submitted to the city for renovations for the shelter at
684 Forrest Avenue. Dover Interfaith has applied for a building permit for minor demolition of the some of the
interior which will not be included in CDBG funding.
FISCAL YEAR 2009
Homeowner Rehabilitation Program
Three (3) homes have been completed (49 S. Kirkwood St., 420 Court St., 720 Carol St.) and the waiting list for
housing renovations will open on January 21, 2010 to accept applications for the first 20 qualified applicants at City
Hall. The remaining 2009 funding will be utilized to rehab homes of the first four to five families on the waiting list.
Homeownership Assistance Program (Down Payment Assistance)
One family has purchased a home. One family will be closing in late January, and one family will be closing in mid
March.
Elizabeth W. Murphey School
The State Historic Preservation Office (SHPO) has denied approval for the replacement windows at the Murphey
School. They would not allow the existing windows to be replaced with vinyl windows. The Executive Director has
submitted bids and a scope of work to replace the steam lines for buildings 12-48 which is currently under review by
SHPO.
RC & D Emergency Home Repairs
Emergency home repairs have been completed on the following homes:
38 North Kirkwood, 117 Quail Hollow Drive, 722 Forest Street and 893 Schoolhouse Lane
Neighborhood Stabilization Program (NSP)
Six properties have been purchased and $822,255 has been expended in NSP funding year to date. Before
renovations can begin on any of the properties, the Memorandums of Understandings must be amended for the NSP
partners to follow the CDBG procurement process.
Dover Community Partnership properties: 343 Mimosa Avenue, 907 Woodcrest Drive, 218 Ann Avenue
Diamond State Community Land Trust properties: 337 North Governors Avenue, 302 Stonebrook Place
Connections Community Support Program: 1430 S. Hancock Avenue
Page 188
MEETING REPORTS
Board of Adjustment:
The Board of Adjustment met at a special meeting held on December 2, 2009 and took the following actins: The
next Board of Adjustment meeting is scheduled for January 20, 2010.
1. Applicant #V-09-13 - 229 S Governors Ave: Action Tire – Moved to deny because the trailer was
placed there without any approval; however, given the owner until the meeting in March to come up
with an alternative solution. If there is no alternative solution, then the trailer would have to be
removed.
2. Applicant #V-09-14 - 508 S State St: Yozima, LLC – Moved to approved based upon Staff
recommendation and testimony received.
3. Applicant #V-09-15 - 211 Delaware Ave – Moved to approve as the Board agrees with the
recommendations of Staff and the testimony given; furthermore, in their opinion it looks like this is part
of the architecture of the building and is for institutional community use.
Downtown Dover Partnership: (Now reported as part of the Public Services Director’s Monthly Report)
Economic Development: (Now reported as part of the Public Services Director’s Monthly Report)
Historic District Commission:
The Historic District Commission did not meet on December 19, 2009 due to the lack of quorum. The next
regularly scheduled meeting for the Historic District Commission is January 21, 2010. Discussion is ongoing
regarding updating the Historic District Guidelines.
Planning Commission
The Planning Commission did not meet on December 21, 2009 due to inclement weather. The next scheduled
Planning Commission meeting is scheduled for January 19, 2010.
Submitted by:
Ann Marie Townshend, AICP
Planning & Community Development Director
Page 189
January 29, 2010
Mayor and Council
City of Dover
P.O. Box 475
Dover DE 19904
Mayor Carey and Members of Council,
On behalf of the officers and members of the Dover Fire Department I would like to
thank City Council and Mr. DePrima for the thoughtful gifts presented at our company
meeting December 7th. The continued support of the City of Dover provides our members
with the training and equipment needed to maintain the best fire / rescue service in the
state of Delaware.
The DFD was involved in several community events during the month of December. Our
tractor drawn ladder truck was used to bring Santa into town for the Festival of Lights,
and Home for the Holidays parade sponsored by the Downtown Dover Partnership. The
DFD also had our annual Operation Santa scheduled for the December 20 -23. Operation
Santa was started in 2002 to help spread Christmas cheer throughout the greater Dover
area know some children may never get to see Santa, we bring him to them. Firefighters
drive Santa through all the neighborhoods handing out candy canes to over 6,000 children
in the four nights. The annual event continues to grow and has had a large impact on our
community over the past seven years. The DFD often gets request for Santa to visit sick
children, and sometimes even adults. Unfortunately this year Operation Santa was
canceled due to the snow and poor road conditions. The members of the DFD are looking
forward to next year.
The Fire Officers for 2010 were sworn by Mayor Carey on December 16th at city hall. I
would like to thank Mayor Carey for his time and kind words.
During the month of December the DFD responded to 99 fire / rescue emergencies.
Thirty incidents were during the snow storm December 19 and 20. I have attached a
report on the DFDs preparation, response, and problems found during the storm, with
solutions.
I have attached the December finical report. Please contact me with any questions.
Page 190
The Dover Fire Department continues to provide the greater Dover area with superior fire
/ rescue service. There is nothing stronger than the heart of a volunteer; our members are
dedicated to protect our neighbors and anyone visiting our great city.
Incidents of Interest
12/05 Motor Vehicle Crash Rt. 1 SB / Exit 104
The DFD, Kent County ALS, and BLS 63 were alerted to an MVC with entrapment on
Rt. 1 SB / Exit 104. Units arrived to find a single vehicle into the trees with two subjects
trapped. Members stabilized the truck, and began to remove the doors and roof of
vehicle. The two patients were transported to Kent General Hospital with non-life
threatening injuries. While on scene several DFD units were diverted to other MVC’s on
Rt. 1. All crashes were due to the poor road conditions. Del-Dot closed Rt. 1 at Exit 104
until salt and sand could be laid for traction.
12/05 Building Fire 195 Commerce Way Capitol Cleaners
DFD was alerted with Kent County ALS, BLS 63, and Hartly Fire Co. for the Rapid
Invention Team (RIT) to 195 Commerce Way for a building fire. Units arrived to find an
active fire in the center of the building. Crews forced the door and made entry to the
building and were able to quickly extinguish the fire. Other crews searched the building
and reported negative results. Crews remained on scene a short time assisting the City
Fire Marshal.
12/07 Motor Vehicle Crash W. North St. Eden Hill
DFD was alerted with Kent County ALS, and BLS 63 to an MVC with entrapment on W.
North St, in front of Eden Hill Medical Center. Crews arrived to find a minor MVC with
the driver trapped. Crews removed the driver’s door and assisted EMS with patient
removal. The patient was transported by EMS to Kent General Hospital with minor
injuries.
12/11 Assist House Fire Asbury Ave / DuPont Hwy. Camden
DFD was alerted for a Ladder and Engine to assist Camden-Wyoming Fire Co. on a
house fire Asbury Ave. / DuPont Hwy. Crews arrived to find fire on the second floor of a
vacant house that was on fire the day before. Crews preformed an exterior attack, due to
the instability of the house. The fire was brought under control and units cleared.
12/14 House Fire 36 Sackarackin Ave.
DFD was alerted for a house fire at 36 Sackarackin Ave. Crews arrived to find smoke
coming from the front door. Crews advanced a hand line in the front door and found a
small fire in the dishwasher. Crews quickly extinguished the fire and used positive
pressure fans to remove lingering smoke from the residents.
Page 191
12/22 House Fire 411 N. Bradford St.
DFD, Kent County ALS, BLS 41, and Little Creek Fire Co for the RIT were alerted to
411 N. Bradford St, for smoke coming from the front door. Units arrived to find heavy
smoke coming from the first floor with and active fire in the rear of the house. Crews
placed a hand line in service for fire attack. There were only two units responding and a
second alarm was sounded. The fire was knocked down but it had worked its way into the
walls. Additional crews entered and opened the ceiling and walls exposing the fire. The
fire was placed under control and crews remained on scene assisting the City Fire
Marshal. The second alarm was sounded due to lack of manpower. Members contribute
their slow response to the poor road conditions in the city.
12/27 House Fire 134 N. American Ave.
DFD, Kent County ALS, BLS 63, and Little Creek Fire Co for the RIT were alerted to
134 N. American Ave. for a fire in the kitchen. Units arrived to find smoke coming from
the front door and the eves of the house. Crews placed a hand line in service and found a
fire in the kitchen and hallway. Crews quickly knocked down the fire and completed a
search of the residents finding and removing two cats. Crews remained on scene assisting
the City Fire Marshal.
Respectfully,
Sean P.M. Christiansen
Chief of Department
Page 192
4:41 PM Robbins Hose Company # 1, Inc.
01/28/10 Profit & Loss Detail
Accrual Basis December 2009
Type Date Num Name Memo Clr Split Amount Balance
Ordinary Income/Expense
Expense
Apparatus Repairs & Maintenance
Gasoline
Check 12/6/2009 89 City of Dover Diesel Fuel City Fund Acco... 958.20 958.20
Total Gasoline 958.20 958.20
Other Equipment Repairs
Check 12/6/2009 93 Southeastern Emerg... Inv 304383 City Fund Acco... 91.17 91.17
Check 12/19/2009 96 Pugh's Service, Inc. Inv-K2123198... City Fund Acco... 110.68 201.85
Total Other Equipment Repairs 201.85 201.85
Uniforms
Check 12/6/2009 91 Dover Army-Navy St... Invoice 17043 City Fund Acco... 82.00 82.00
Total Uniforms 82.00 82.00
Apparatus Repairs & Maintenance - Other
Check 12/6/2009 92 Hitchens Tire Service Inv 224023- E... City Fund Acco... 105.00 105.00
Check 12/19/2009 97 Singer Associates Inv MORO22... City Fund Acco... 1,792.94 1,897.94
Total Apparatus Repairs & Maintenance - Other 1,897.94 1,897.94
Total Apparatus Repairs & Maintenance 3,139.99 3,139.99
Building Utilities
Electricity
Check 12/6/2009 90 City of Dover Electric for No... City Fund Acco... 2,966.50 2,966.50
Check 12/12/2009 95 City of Dover Electric Charg... City Fund Acco... 565.18 3,531.68
Total Electricity 3,531.68 3,531.68
Heating Expenses
Check 12/6/2009 88 Chesapeake Utilities Station 2 Gas City Fund Acco... 187.55 187.55
Total Heating Expenses 187.55 187.55
Telephone
Check 12/6/2009 89 City of Dover Telephone- V... City Fund Acco... 788.61 788.61
Check 12/6/2009 94 Verizon Wireless November Ch... City Fund Acco... 5.67 794.28
Total Telephone 794.28 794.28
Water/Sewer
Check 12/6/2009 90 City of Dover Water & Sew... City Fund Acco... 190.64 190.64
Check 12/12/2009 95 City of Dover Water/Sewer ... City Fund Acco... 16.78 207.42
Total Water/Sewer 207.42 207.42
Total Building Utilities 4,720.93 4,720.93
Page 1
Page 193
4:41 PM Robbins Hose Company # 1, Inc.
01/28/10 Profit & Loss Detail
Accrual Basis December 2009
Type Date Num Name Memo Clr Split Amount Balance
Office Supplies
Check 12/6/2009 89 City of Dover Postage City Fund Acco... 13.64 13.64
Total Office Supplies 13.64 13.64
Total Expense 7,874.56 7,874.56
Net Ordinary Income -7,874.56 -7,874.56
Net Income -7,874.56 -7,874.56
Page 2
Page 194
FY 09-10 City Funded Account Balance Sheet
ACCOUNT BUDGET SPENT BALANCE
Apparatus Repairs & Maintenance $ 60,500.00 $ 36,026.08 $ 24,473.92
Gasoline $ 21,000.00 $ 4,164.91 $ 16,835.09
Medical Supplies $ 700.00 $ 639.60 $ 60.40
Other Equipment Repairs $ 4,000.00 $ 837.99 $ 3,162.01
Program Expenses $ 36,630.00 $ 5,798.82 $ 30,831.18
Radio Repairs $ 2,000.00 $ 484.55 $ 1,515.45
Safety & Security $ 3,150.00 $ 1,135.05 $ 2,014.95
Small Tools $ 4,800.00 $ 1,300.00 $ 3,500.00
Uniforms & Firefighting Gear $ 26,100.00 $ 6,216.78 $ 19,883.22
Building Expenses- Electricity $ 53,820.00 $ 23,983.85 $ 29,836.15
Building Maintenance Supplies $ 1,950.00 $ 1,950.00
Heating Expenses- Gas $ 20,000.00 $ 1,777.92 $ 18,222.08
Telephone $ 19,340.00 $ 5,428.36 $ 13,911.64
Water & Sewer $ 2,150.00 $ 1,237.38 $ 912.62
Contractual Services $ 16,587.00 $ - $ 16,587.00
Training & Travel $ 8,365.00 $ 810.00 $ 7,555.00
Pension $ 3,500.00 $ - $ 3,500.00
Office Supplies $ 200.00 $ 87.77 $ 112.23
Balance as of: 12/31/09
Page 195
Dover Fire Department
Response Report
Snow Storm December 2009
Page 197
On Saturday December 19, 2009 a major snow storm moved across the Mid‐Atlantic States. The storm
brought over 18.0” of snow, and gusty winds to the greater Dover area over a period of 36 hours. The
Dover Fire Department (DFD) faced several challenges during the storm. This report gives details of the
DFD preparation and operation over the period of three days and the issues we faced. This early storm
has brought to light problems in the within city departments.
On Tuesday December 15th I received a group email from the Delaware Volunteer Firefighters
Association (DVFA) President advising of the possibility of a large storm to be in our area later in the
week. This was information provided by the Delaware Emergency Management Agency (DEMA). There
were several emails to follow during the week giving updates, including time track, and predicted
accumulations.
The Fire Officers of the DFD were assigned duties for preparation of the storm on Wednesday December
16th. I routinely briefed the officers with the information obtained from DEMA by email. Over the next
two days all 14 pieces of apparatus were topped off with diesel fuel, gas powered tools were run, and
serviced. The bunkrooms at both stations were made to accommodate ten firefighters each, and food
was purchased for three days. Members were contacted for their availability for the duration of the
storm. I contacted the Fire Dispatchers for their availability if the need for a second dispatcher is needed
due to call volume. Late Friday I was contacted by EMC Hutchison who advised me of the approaching
storm and possible accumulation. I advised him of the preparations made by the DFD and crews would
be in place at both station 7 am Saturday. I also offered the assistance of the DFD if it should be needed
during the storm.
I was contacted by Fire Dispatcher Osika at 5 am who advised the snow is accumulating a roads are
covered with more than 2”. Dispatcher Osika was advised to call the established crews and have them
report to their assigned stations. At 6am the DFD had crews in service at both stations. The Fire Officers
met and created an Organizational Chart using an ICS 207 form. This chart would be used a guide for the
chain of command for the duration of operation. Other ICS forms were completed for the operation and
are attached.
Over the course of three days the DFD responded to 30 fire/rescue emergencies and over 30 public
assist for stranded motorist in the greater Dover area. Most weather related incidents, including several
possible structural collapses due to the weight of the snow on roofs. During the storm and the days after
the DFDs four wheel drive Field Piece was used to assist the city’s Basic Life Support unit (BLS). The unit
and crew drove ahead of the BLS unit to make tracks in unplowed developments, assisted with getting
the patient to the unit and used the wench to pull the BLS unit if needed. Early Saturday night I was
contacted by the EMC and asked if the city BLS units could stage at the fire stations due to large snow
drifts on off of S. Little Creek Rd. The BLS units were in place at both stations by 7pm.
We continued to staff both stations until 7am Monday, and a single crew was placed in service during
the day at station 1. Temperatures were expected to be below freezing Monday night, and road
conditions were poor throughout the city. It was decided to place crews in both stations at 7pm and
they were released 7am Tuesday. The members of the DFD logged 828 man hours during the storm.
Page 198
Tuesday night December 22 at 6:30pm the DFD was alerted to a house on fire in the 400 block of N.
Bradford St. The on duty Assistant Chief arrived to find heavy smoke coming from the first floor of the
two story duplex. The first piece of apparatus to arrive was E2 which responded from station 2 on
Kenton Rd. E4 was delayed due to the road conditions on Governors Ave. The fire went quickly to a
second alarm due to the lack of manpower on scene. The second alarm brought an additional engine, 2
ladders and a rescue. After the fire was extinguished units returned to station 1. Members advised the
officers they responded on the first alarm but were unable to get to the station due to the roads. One
member relayed it took him 20 minutes to get from Pine St. to station 1 on Reed St. This fire was three
days after the snow fell.
The Fire Officers have identified these problems and offered solutions for future storms.
1. Lack of communication on local level, weather updates, key points in preparation, action plan.
a. Conference calls between key departments that will be utilized during the storm. Fire,
Police, Utilities, Electric, City Manager.
2. Lack of access to both fire stations throughout the storm for members and fire apparatus. On
several attempts calls were made for the plows to clear the apparatus ramps at both stations.
We were told “we will get there when we can” at 7pm on Saturday we had 5” of snow on the
ramp of station 2. DelDot cleared the parking lot and ramps of station 2 late Tuesday. Reed St.
was finally cleared of loose snow late Tuesday afternoon.
a. Fire, Police, and EMS are a part of public safety and should be given priority over all
other task. These areas should be taken care of on a regular schedule insuring
emergency vehicles can respond.
3. Fire apparatus and BLS units had limited to no access to developments throughout the city.
Unplowed snow created road blocks causing delayed responses and hampered efforts of first
responders. We traveled through four neighborhoods west of the railroad tracks that had not
been touched as of 5pm Sunday night. We contacted dispatch for the plow crews and were told
“we’re working on it” 10:30pm the first plow came through Mallard Pond.
a. A plow or frontend loader should be dedicated to each fire station to drive in front of
emergency vehicles to clear the way. This has been done in the past and worked well.
4. Crews on scene of a partial roof collapse requested a building inspector to the scene structural
damage. We were not able to make contact with a building inspector after trying all our contact
numbers. Mr. DePrima responded and condemned the home to.
a. On call Building Inspectors with proper contact numbers issued to the DFD, DPD.
5. Fire apparatus had trouble driving through several inches of snow. Apparatus on‐spot chains
were ineffective.
a. DFD has obtained information on snow chains for the entire fleet. This may not be cost
effective at this time.
6. Apparatus response times were hampered due to vehicles stuck in the snow. Cars without four
wheel drive could not pass through the snow causing road blocks.
a. Provide DPD four wheel drive vehicles to enforce driving restrictions during snow
storms.
7. There was no plan (that the DFD was privy to) of how the city was going to deal with this storm.
a. A plan of action of how the city is going to respond should be developed and
implemented before the storm arrives to include outside resources. This could be done
using NIMS ICS forms.
8. The seemed to be no organization within the city during the storm. The DFD and DPD have a
command structures that are followed every day.
Page 199
a. A NIMS ICS 207 form should be completed for the entire city. From top to bottom. One
for daily operations and one for emergency operations to include Unified Command.
Every employee is educated in ICS 100 & ICS 700, and would understand how this chart
works. Span of control is five to seven people; this chart would simplify who is
responsible for what and who they report to.
9. Lack of information to the public from the city. I understand the city PIO is out sick and hope
she is doing well, but this is a role that needed to be filled to inform the public of the efforts of
the city, information on safety during the storm, and any other valuable information that the
Unified Command wanted to disperse
a. The city waited too long to address the citizen of Dover. The local media would have
played a key role in informing residents to stay indoors, and allow time for the plows to
get to the roads. Reverse 911 could have been used. One person needs to fill the role of
the PIO and put the information out.
The Dover Fire Departments preparation and operation during the storm was similar to storms of the
past. We were able to staff crews at both stations for 72 hours. The volunteers who stayed countless
hours away from their families, homes, and jobs are dedicated to protect the lives and property of the
citizens of the greater Dover area. The problems the DFD encountered during the storm were associated
with the operations of other city departments. This storm should be used as a learning experience to
better the service we provide to the citizens of Dover.
Respectfully,
Sean P.M. Christiansen
Chief of Department
Page 200
Organization Assignment List, ICS Form 203
1. INCIDENT NAME 2. DATE PREPARED 3. TIME PREPARED
ORGANIZATION ASSIGMENT LIST Snow 12/09 12/18/09 21:00
POSITION Fire Chief NAME Sean Christiansen 4. OPERATIONAL PERIOD (DATE/TIME)
12/19/09 0700 -
5. INCIDENT COMMAND AND STAFF 9. OPERATIONS SECTION
INCIDENT COMMANDER Sean Christiansen CHIEF Cole Enright
DEPUTY Cole Enright DEPUTY
SAFETY OFFICER Sean Christiansen a. BRANCH I- DIVISION/GROUPS
INFORMATION OFFICER Sean Christiansen BRANCH DIRECTOR
LIAISON OFFICER Sean Christiansen DEPUTY
DIVISION/GROUP Station 1 David Hiser
6. AGENCY REPRESENTATIVES DIVISION/ GROUP Engine 4
AGENCY NAME DIVISION/ GROUP Brush 9
DIVISION/GROUP Ladder 2
DIVISION /GROUP
b. BRANCH II- DIVISIONS/GROUPS
BRANCH DIRECTOR
DEPUTY
DIVISION/GROUP Station 2 Carl Troubertaris
7. PLANNING SECTION DIVISION/GROUP Engine 2
CHIEF DIVISION/GROUP Utility 1
DEPUTY DIVISION/GROUP
RESOURCES UNIT
SITUATION UNIT c. BRANCH III- DIVISIONS/GROUPS
DOCUMENTATION UNIT BRANCH DIRECTOR
DEMOBILIZATION UNIT DEPUTY
TECHNICAL SPECIALISTS DIVISION/GROUP
DIVISION/GROUP
DIVISION/GROUP
8. LOGISTICS SECTION d. AIR OPERATIONS BRANCH
CHIEF Walt Slezak A&M AIR OPERATIONS BR. DIR.
DEPUTY AIR TACTICAL GROUP SUP.
AIR SUPPORT GROUP SUP.
HELICOPTER COORDINATOR
a. SUPPORT BRANCH AIR TANKER/FIXED WING CRD.
DIRECTOR
SUPPLY UNIT
FACILITIES UNIT
GROUND SUPPORT UNIT 10. FINANCE/ADMINISTRATION SECTION
CHIEF Terry Witham
DEPUTY
b. SERVICE BRANCH TIME UNIT
DIRECTOR PROCUREMENT UNIT
COMMUNICATIONS UNIT Fire Dispatcher COMPENSATION/CLAIMS UNIT
MEDICAL UNIT Mike O’Connor COST UNIT
FOOD UNIT Ray Osika
PREPARED BY (RESOURCES UNIT)
Page 201
Assignment List, ICS Form 204
1. BRANCH 2. DIVISION/GROUP
Station 1 ASSIGNMENT LIST
3. INCIDENT NAME 4. OPERATIONAL PERIOD
Snow 12/09 DATE 12/19/09 TIME 0700 -
5. OPERATIONAL PERSONNEL
OPERATIONS CHIEF Enright DIVISION/GROUP SUPERVISOR Hiser
BRANCH DIRECTOR AIR TACTICAL GROUP SUPERVISOR
6. RESOURCES ASSIGNED TO THIS PERIOD
DROP
NUMBER TRANS. PICKUP
STRIKE TEAM/TASK FORCE/ OFF
PERSONS NEEDED PT./TIME
RESOURCE DESIGNATOR EMT LEADER PT./TIME
Engine 4 1 Hiser 5 N/A N/A N/A
Ladder 2 1 O’Connor 5 N/A N/A N/A
Brush 9 0 Mullaney 2 N/A N/A N/A
7. CONTROL OPERATIONS
8. SPECIAL INSTRUCTIONS
9. DIVISION/GROUP COMMUNICATIONS SUMMARY
FUNCTION FREQ. SYSTEM CHAN. FUNCTION FREQ. SYSTEM CHAN.
LOCAL N/A 800 Doverfir LOCAL N/A 800 Doverfir
COMMAND SUPPORT
REPEAT REPEAT
DIV./GROUP GROUND
TACTICAL TO AIR
PREPARED BY (RESOURCE UNIT LEADER) APPROVED BY (PLANNING SECT. CH.) DATE TIME
Page 202
Assignment List, ICS Form 204
1. BRANCH 2. DIVISION/GROUP
Station 2 ASSIGNMENT LIST
3. INCIDENT NAME 4. OPERATIONAL PERIOD
Snow 12/09 DATE 12/19/09 TIME 0700 -
5. OPERATIONAL PERSONNEL
OPERATIONS CHIEF Enright DIVISION/GROUP SUPERVISOR Troubertaris
BRANCH DIRECTOR AIR TACTICAL GROUP SUPERVISOR
6. RESOURCES ASSIGNED TO THIS PERIOD
DROP
NUMBER TRANS. PICKUP
STRIKE TEAM/TASK FORCE/ OFF
PERSONS NEEDED PT./TIME
RESOURCE DESIGNATOR EMT LEADER PT./TIME
Engine 2 1 Troubertaris 5 N/A N/A N/A
Utility 1 0 Small 2 N/A N/A N/A
7. CONTROL OPERATIONS
8. SPECIAL INSTRUCTIONS
9. DIVISION/GROUP COMMUNICATIONS SUMMARY
FUNCTION FREQ. SYSTEM CHAN. FUNCTION FREQ. SYSTEM CHAN.
LOCAL N/A 800 Doverfir LOCAL N/A 800 Doverfir
COMMAND SUPPORT
REPEAT REPEAT
DIV./GROUP GROUND
TACTICAL TO AIR
PREPARED BY (RESOURCE UNIT LEADER) APPROVED BY (PLANNING SECT. CH.) DATE TIME
Page 203
1. Incident Name 2. Date Prepared 3. Time Prepared 4. Operational Period
MEDICAL PLAN Snow 12/09 12/18/09 21:00 0700 -
5. Incident Medical Aid Station
Paramedics
Medical Aid Stations Location
Yes No
Fire Station 1 103 S. Governors Ave. X
Fire Station 2 911 Kenton Rd X
Kent General ER S. State St. X
6. Transportation
A. Ambulance Services
Paramedics
Name Address Phone
Yes No
A63 Fire Station 1 X
B63 Fire Station 2 X
B. Incident Ambulances
Paramedics
Name Location
Yes No
A43 Cheswold X
A41 Camden X
7. Hospitals
Travel Time Helipad Burn Center
Name Address Phone
Air Ground Yes No Yes No
Kent General Dover 5m 10m X X
Milford Milford 10m 20m X X
Christiana Newark 20m 40m X X
Crozer Chester PA 30m 60m X X
Chester
8. Medical Emergency Procedures
Treat with basic first aid and call Dover Fire Dispatch for EMS response.
Page 205
City of Dover
Capital Investment Plan
Project Tracking Report
December 31, 2009
Points to Remember -
* Original Project Budget = Original Total Project Budget initially included in approved annual budget.
* Latest Project Budget = Revised Total Project Budget included in most recent approved annual budget or one of the following:
bond resolution, revolving fund loan agreement, Council approved budget amendment, or City Manager approved amendment as per
the Budget Amendment Procedure.
* Current Fiscal Year - Revised Fiscal Year Budget = Current Year approved project budgets plus carry forward balances of unspent
budgets in the prior fiscal year. Project Carry Forward balances will be submitted to City Council for amendment in January 2010.
Can also be amended with City Manager approval per the Budget Amendment Procedure.
* Water Quality, Inflow/Infiltration, Distribution Upgrades and New Development projects are budgeted as a blanket project and once
individual projects are identified and estimated they are created using an allocation of the overall budgeted amount.
Examples are Water Quality - Pear Street; New Developments - Kent County Lighting; Distribution Upgrades - Crossgates;
* The FY10 Budget for Community Transportation & Streets $350,000 is expected to change based on the State of the City Review.
* Status and Comments provided by City Manager.
* For Finance purposes projects are considered completed when placed in service and all charges have been processed.
Community Water & Total
Current Year Budget Funding Sources General Transportation Wastewater Electric CIP
Beginning Budget Balance $ 375,408 $ - $ 699 $ 36,619 $ 412,726
Federal &/or State Grants 4,180,234 1,000,000 45,248 240,875 5,466,357
Revolving Fund Loans - - 8,346,498 - 8,346,498
Bond Proceeds 1,912,433 - - 4,240,034 6,152,467
Impact Fees - - 518,230 - 518,230
State Funds (FY09 Carry Forward Gov Ave) - - - 710,318 710,318
Parkland Reserve 40,000 - - - 40,000
Library Reserve & Contributions 3,180,235 - 3,180,235
Transfer from Operating Funds 344,802 472,690 700,000 886,012 2,403,504
Interest Earned 2,700 - - 33,700 36,400
Project Carry Forward Balances 51,006 - 1,094,697 2,652,769 3,798,472
Total Funding Sources (Unaudited) $ 10,086,818 $ 1,472,690 $ 10,705,372 $ 8,800,327 $ 31,065,207
Page 206
City of Dover
General Fund - Major CIP Projects
December, 2009
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
FY2008
M Park Improvement Program $ 30,000 $ 30,000 $ 28,734 $ 1,266 95.8% $ - $ 30,000 $ 28,734 0.0% Complete Basketball Court repaved.
Totals - FY08 $ 30,000 $ 30,000 $ 28,734 $ 1,266 95.8% $ - $ 30,000 $ 28,734 0.0%
FY2009
M/G New Library Project $ 18,200,000 $ 24,679,934 $ 1,070,640 $ 23,609,294 4.3% $ 8,912,433 $ 9,272,902 $ 333,574 3.7% Started Finished Design Development.
Totals - FY09 $ 18,200,000 $ 24,679,934 $ 1,070,640 $ 23,609,294 4.3% $ 8,912,433 $ 9,272,902 $ 333,574 3.7%
FY2010
Vehicles & Equipment $ 372,910 $ 372,910 $ 255,474 $ 117,436 68.5% $ 372,910 $ 393,916 $ 255,474 68.5% Started Includes DFD payment & Police Grants.
Contractor complete, will do some in house
Concrete Program 50,000 50,000 1,119 48,881 2.2% 50,000 50,000 1,119 2.2% Complete repairs.
Pitts Center Addition 50,000 50,000 - 50,000 0.0% - 40,000 - 0.0% Started Council approved.
Transfer to CT Fund 300,000 300,000 - 300,000 0.0% 300,000 300,000 - 0.0% N/A
Totals - FY10 $ 772,910 $ 772,910 $ 256,593 $ 516,317 33.2% $ 722,910 $ 783,916 $ 256,593 35.5%
Grand Totals $ 19,002,910 $ 25,482,844 $ 1,355,967 $ 24,126,877 5.3% $ 9,635,343 $ 10,086,818 $ 618,901 6.4%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
G = Grant funded project
Page 207
City of Dover
Community Transportation & General Fund Street Funds - Major CIP Projects
December, 2009
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Type Description Budget Budget Expenses Balance Spent Budget Budget (1) Expenses Spent Status Comments
FY 2002
North Street Sidewalk $ 80,416 $ 80,416 $ - $ 80,416 0.0% $ - $ 80,416 $ - 0.0% Not started Work on hold pending Collegiate decision.
Totals $ 80,416 $ 80,416 $ - $ 80,416 0.0% $ - $ 80,416 $ - 0.0%
FY 2005
Dover Little League Parking Lot Awaiting DELDOT/staff decision on re-
Phase II $ 14,906 $ 14,906 $ 3,332 $ 11,574 22.4% $ - $ 11,574 $ - 0.0% Done appropriation of available funds.
Totals $ 14,906 $ 14,906 $ 3,332 $ 11,574 22.4% $ - $ 11,574 $ - 0.0% -
FY 2006
M Lincoln Park Center $ 400,000 $ 400,000 $ 256,311 $ 143,689 64.1% $ - $ 147,275 $ 3,586 0.0% Started Ongoing.
Totals $ 400,000 $ 400,000 $ 256,311 $ 143,689 64.1% $ - $ 147,275 $ 3,586 0.0% - -
FY 2007
10% received from State, not part of street
program. Separate contract due to nature
E. Water Street Brick Sidewalk $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ - $ 65,000 $ - 0.0% Not started of work.
Totals $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ - $ 65,000 $ - 0.0%
FY 2009
Spruance Road - White Oak to
Maple Parkway $ 141,000 $ 141,000 $ 101,464 $ 39,536 72.0% $ - $ 101,465 $ 101,464 0.0% Started Work in progress.
Spruance Road - Maple
Parkway to East Division 125,400 125,400 120,309 5,091 95.9% - 120,309 120,309 0.0% Started Work in progress.
Various FY09 Streets 225,000 225,000 185,000 40,000 82.2% - 85,000 45,000 0.0% Started Independence & Greenway started.
Schutte Park 21,950 21,950 - 21,950 0.0% - 21,950 - 0.0% Not Started Scheduled FY 2009.
Woodsedge Road 75,000 75,000 113,234 (38,234) 151.0% - 113,234 113,234 0.0% Not Started Scheduled FY 2009.
Various Streets 206,287 206,287 - 206,287 0.0% - 206,287 - 0.0% Not Started
Westover Landscaping 2,500 2,500 1,451 1,049 58.0% - 2,500 1,451 0.0% Work is done
Totals $ 797,137 $ 797,137 $ 521,458 $ 275,679 65.4% $ - $ 650,745 $ 381,458 0.0%
FY 2010
Street & Alley Program $ 350,000 $ 522,690 $ 30,895 491,795 5.9% $ 350,000 $ 472,690 $ 30,895 8.8% Not Started Original Budget should be $300,000.
Budgeted CT Agreements FY10 1,000,000 1,000,000 - 1,000,000 0.0% 1,000,000 44,990 - 0.0% Not Started No fiscal FY10 agreements signed.
Totals $ 1,350,000 $ 1,522,690 $ 30,895 $ 1,491,795 2.0% $ 1,350,000 $ 517,680 $ 30,895 2.3%
Grand Totals $ 2,707,459 $ 2,880,149 $ 811,996 $ 2,068,153 28.2% $ 1,350,000 $ 1,472,690 $ 415,939 30.8%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
Page 208
City of Dover
Water/Wastewater Improvement & Extension Fund - Major CIP Projects
December, 2009
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Approved Revised Fiscal %
Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget
Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
FY 2008
South Governors Ave. Water Main Upgrade $ 200,000 $ 200,000 $ - $ 200,000 0.0% $ - $ 200,000 $ - 0.0% Started Construction North of Wyoming Ave.
M 1.0 MG Elevated Water Storage Tower 4,196,600 2,590,000 4,830 2,585,170 0.2% 200,000 196,255 1,085 0.6% Started Selecting Tank Model & Site; FY11 = Constr.
Test Well at Schutte Successful; FY11 = Constr.
M Piney Point Well 398,800 665,000 52,475 612,525 7.9% - 185,455 22,930 12.4% Started
M South Governors Ave. Sewer Main 300,000 291,000 10,514 280,486 3.6% - 281,088 602 0.2% Started Construction North of Wyoming.
M/SL US 13 East Sanitary Sewer Interceptor 2,376,800 3,409,641 226,667 3,182,974 6.6% 3,201,480 3,201,480 18,506 0.6% Started Pre-construction meeting set
M Lafferty Lane Package P/S Replacement 230,000 374,369 418,833 (44,464) 111.9% - - 26,269 0.0% Completed In service. O/S Encumbrance $26,269.
Totals - FY08 $ 7,702,200 $ 7,530,010 $ 713,319 $ 6,816,691 9.5% $ 3,401,480 $ 4,064,278 $ 69,392 1.7%
FY2009
Washington Street $ 492,800 $ 310,100 $ 310,063 $ 37 100.0% $ - $ - $ - 0.0% Completed
Pear Street 759,100 653,804 424,145 229,659 64.9% - 331,900 102,241 30.8% Started Pear Street Done, working on West St.
South Street 120,800 79,800 37,802 41,998 47.4% - - 333 0.0% Completed
Contact Chambers - residual analyzers 100,000 113,800 95,484 18,316 83.9% - - - 0.0% Completed
M/SL Bayard Avenue 590,910 590,910 6,490 584,420 1.1% 533,510 584,420 - 0.0% Started Waiting for State financing approval.
M/SL East side N. State Street 868,707 876,703 29,003 847,700 3.3% 846,807 847,700 - 0.0% Started Waiting for State financing approval.
M/SL Route 13 Water Main 1,058,700 1,091,797 102,152 989,645 9.4% 1,023,700 1,024,400 34,755 3.4% Started Waiting for State financing approval.
R Water Quality Improvements FY09 $ 3,991,017 $ 3,716,914 $ 1,005,139 $ 2,711,775 27.0% $ 2,404,017 $ 2,788,420 $ 137,329 34.2% Started
M/SL DE State University Pumping Station Repl. 386,400 386,400 33,504 352,896 8.7% 336,400 360,473 7,577 2.1% Started Preconstruction Meeting set.
M/SL Fox Hall/Retreat Force Main Rerouting 133,100 139,245 38,009 101,236 27.3% 107,200 107,200 5,964 5.6% Started Preconstruction meeting set.
M/SL Acorn Lane Pump Station Replace. 386,400 386,400 34,223 352,177 8.9% 336,400 359,823 7,646 2.1% Started Preconstruction meeting set.
Totals - FY09 $ 4,896,917 $ 4,628,959 $ 1,110,875 $ 3,518,084 24.0% $ 3,184,017 $ 3,615,916 $ 158,516 4.4%
FY2010
Vehicles & Equipment $ 55,600 $ 55,600 $ 48,648 $ 6,952 87.5% $ 55,600 $ 55,600 $ 48,648 87.5% Completed Vehicles and Equipment in service.
M Water Quality - Walker Road 200,000 200,000 - 200,000 0.0% 200,000 200,000 - 0.0% Started In Design-survey only, in house design.
R Wellhead Redevelopment Program 55,000 70,250 70,238 12 100.0% 55,000 70,250 70,238 100.0% Completed Done.
Remote Control & Monitor Wells 55,000 55,000 23,104 31,896 42.0% 55,000 55,000 23,104 42.0% Started Radio in, installation next.
R Misc. Distribution System Replacements 65,000 49,750 - 49,750 0.0% 65,000 49,750 - 0.0% Not Started Ongoing, as needed.
R Inflow/Infiltration Removal - Phase II 1,800,000 1,800,000 - 1,800,000 0.0% 1,800,000 1,800,000 - 0.0% Started No bidders, relooking at spec's, have to rebid.
R Scada Technology Equip Upgrade 79,300 79,300 51,389 27,911 64.8% 79,300 79,300 51,389 64.8% Started RTU's in, installation started.
M Del. State Univ. Force Main Rerouting 137,700 137,700 - 137,700 0.0% 26,800 26,800 - 0.0% Started Design only, awarded to Braun Engineering.
M Fox Hall Pump Station 427,900 427,900 - 427,900 0.0% 52,000 52,000 - 0.0% Started Design only, awarded to Braun Engineering.
M Heatherfield Pumping Station Upgrade 220,400 220,400 - 220,400 0.0% 40,000 40,000 - 0.0% Started Design only, awarded to Braun Engineering.
I Tar Ditch Interceptor Upgrade 518,230 518,230 - 518,230 0.0% 518,230 518,230 - 0.0% Started Design only, awarded to Braun Engineering.
R Misc. Sewer System Improvements 33,000 33,000 - 33,000 0.0% 33,000 33,000 - 0.0% Not Started Ongoing, as needed.
Department of Energy Grant 45,248 45,248 - 45,248 0.0% - 45,248 - 0.0% Started Grant approved, ordering will begin.
Totals - FY10 $ 3,692,378 $ 3,692,378 $ 193,379 $ 3,498,999 5.2% $ 2,979,930 $ 3,025,178 $ 193,379 6.4%
Grand Totals $ 16,291,495 $ 15,851,347 $ 2,017,572 $ 13,833,775 12.7% $ 9,565,427 $ 10,705,372 $ 421,287 3.9%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
SL = State Loan Project - construction phase is financed
I = Impact Fee Financed Project
Page 209
City of Dover
Electric Improvement & Extension Fund - Major CIP Projects
December, 2009
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Current Revised Fiscal %
Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget
Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
FY 2006
M/B 69 KV feeders 3 and 4 $ 11,060,000 $ 8,250,382 $ 8,509,840 $ (259,458) 103.1% $ - $ 94,459 $ 353,917 374.7% Done In service.
Completed south of Wyoming.
M/S Governor's Avenue Rebuild 1,268,450 2,068,260 453,246 1,615,014 21.9% - 1,629,658 14,644 0.9% Started Working north of Wyoming.
Totals - FY06 $ 12,328,450 $ 10,318,642 $ 8,963,086 $ 1,355,556 86.9% $ - $ 1,724,117 $ 368,561 21.4%
FY 2008
Unit 3 Turb Bearing Fire Protect Deluge Selecting vendor.
$ 50,000 $ 50,000 $ - $ 50,000 0.0% $ - $ 50,000 $ - 0.0% Started
M/B Horsepond Road Substation 1,020,000 1,039,000 1,029,397 9,603 99.1% - 9,603 - 0.0% Completed In service.
McKee Run Unit 3 Pollution
M/B Done
Remediation & Fuel Testing 3,000,000 3,120,555 2,733,099 387,456 87.6% - 506,225 118,769 23.5% Completed
M/B St. Jones Substation 5,376,068 6,151,195 5,952,326 198,869 96.8% - 275,009 76,140 27.7% Completed In service.
Totals - FY08 $ 9,446,068 $ 10,360,750 $ 9,714,822 $ 645,928 93.8% $ - $ 840,837 $ 194,909 23.2%
FY2009
Equipment ordered. Should be
Danner Farm Transformer $ 45,000 $ 45,000 $ 25,304 $ 19,696 56.2% $ - $ 21,417 $ 1,721 8.0% Started done by March.
Distribution Upgrades - Schoolview 100,000 175,000 173,134 1,866 98.9% - 16,398 14,532 88.6% Started On-going.
McKee & VanSant Arc Flash 50,000 50,000 - 50,000 0.0% - 50,000 - 0.0% Started 90% Complete.
Totals - FY09 $ 195,000 $ 270,000 $ 198,438 $ 71,562 155.2% $ - $ 87,815 $ 16,253 0.0%
FY2010
Vehicles & Equipment $ 347,042 $ 347,042 $ 305,394 $ 41,648 88.0% $ 347,042 $ 452,765 305,394 67.5% Started Truck in service.
B Vansant CT Mark IV Control (Replmnt) 700,000 700,000 28,299 671,701 4.0% 700,000 700,000 28,299 4.0% Started Project kick off meeting held.
B Plant Driveway 240,000 240,000 - 240,000 0.0% 240,000 240,000 - 0.0% Not Started
R Misc. Upgrades 51,000 51,000 2,671 48,329 5.2% 51,000 51,000 2,671 5.2% Started Ongoing, as needed.
McKee Run Smoke/Heat Detection 55,000 55,000 - 55,000 0.0% 55,000 55,000 - 0.0% Started Bid Awarded.
Work Mgmt. System Replacement 85,000 85,000 83 84,917 0.1% 85,000 85,000 83 0.1% Started Out to Bid.
Unit 3 Remove Cyclone Separators 51,000 51,000 - 51,000 0.0% 51,000 51,000 - 0.0% Started Design and Permitting.
Unit 2 Remove Cyclone Separators 36,000 36,000 - 36,000 0.0% 36,000 36,000 - 0.0% Started Design and Permitting.
Unit 1 Remove Cyclone Separators 36,000 36,000 - 36,000 0.0% 36,000 36,000 - 0.0% Started Design and Permitting.
Department of Energy Grant 135,152 135,152 - 135,152 0.0% - 135,152 - 0.0% Started Bidding.
R UG Transformers 156,570 156,570 32,696 123,874 20.9% 156,570 156,570 32,696 20.9% Started Ongoing, as needed.
R UG Conductors 457,780 457,780 124,359 333,421 27.2% 457,780 457,780 124,359 27.2% Started Ongoing, as needed.
R Kent County Lighting Project 216,950 216,950 24,190 192,760 11.2% 216,950 216,950 24,190 11.2% Started Working in Fairfield.
R Single & 3 Phase Meters 50,000 50,000 10,854 39,146 21.7% 50,000 50,000 10,854 21.7% Started Ongoing as needed.
Total New Developments 881,300 881,300 192,099 689,201 21.8% 881,300 881,300 192,099 21.8%
R Lighting Improvements & Rehab 50,000 50,000 37,561 12,439 75.1% 50,000 50,000 37,561 75.1% Started Finishing Govs aven.
R Replacement of 69KV Breakers 183,000 183,000 155,642 27,358 85.1% 183,000 183,000 155,642 85.1% Started Breakers Received.
R Replace SS Equipment (as required) 40,000 40,000 - 40,000 0.0% 40,000 40,000 - 0.0% Started Ongoing, as needed.
R Distribution Capacitors 120,000 120,000 16,992 103,008 14.2% 120,000 120,000 16,992 14.2% Started Out to Bid.
Under construction. May
15.1%
M/B Mid City Substation 1,488,461 1,593,461 240,733 1,352,728 15.1% 1,593,461 1,593,461 240,733 Started completion planned.
R PT & CT Replacement 260,880 260,880 - 260,880 0.0% 260,880 260,880 - 0.0% Started Going to Council.
R Transmission & Switches 23,000 23,000 10,332 12,668 44.9% 23,000 23,000 10,332 44.9% Started Ongoing as needed.
R Upgrade Trans., Distr. Lines 351,096 351,096 149,868 201,228 42.7% 351,096 351,096 149,868 42.7% Started Ongoing as needed.
B Crossgates 396,904 396,904 260,062 136,842 65.5% 396,904 396,904 260,062 65.5% Started Line burial on going.
B Buchanan Acres 406,000 406,000 271,375 134,625 66.8% 406,000 406,000 271,375 66.8% Started Line burial ongong.
Total Distribution Upgrades 1,154,000 1,154,000 681,305 472,695 59.0% 1,154,000 1,154,000 681,305 59.0% In Kent Acres & S. of Dover.
Totals - FY10 $ 5,936,835 $ 6,041,835 $ 1,671,111 $ 4,370,724 27.7% $ 5,906,683 $ 6,147,558 $ 1,671,111 27.2%
Grand Totals $ 27,906,353 $ 26,991,227 $ 20,547,457 $ 6,443,770 76.1% $ 5,906,683 $ 8,800,327 $ 2,250,834 25.6%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
B = Bonded Project
S = State fully or partially reimbursed project
Page 210
DOVER HUMAN RELATIONS COMMISSION
ANNUAL REPORT OF ACTIVITIES
February 2009-February 2010
The Dover Human Relations Commission (DHRC) had a very busy and
productive year from February 2009 through January 2010. This report details the
activities and achievements of the DHRC over the latter period.
The DHRC continued its advocacy role by revisiting the Slavery Apology
Resolution, which was originally passed unanimously by the Commission in April
2007. Thanks to the initiative of Commissioner Mark Monroe, the DHRC
undertook an extensive study of similar resolutions passed by the U.S. Congress
and by at least six states throughout America. As a result of this study, and with
the renewed interest in the topic by members of the Commission and citizens alike,
the DHRC held public forums in November 2009 and January 2010, both of which
garnered overwhelming support for the resolution. After revising the original
Slavery Apology Resolution, the DHRC passed the resolution unanimously for the
second time in less than three years. The resolution was forwarded to Dover
City Council for action.
While the latter issue resulted in strong support among members of the
Dover community, the Gay Marriage Resolution did not. This resolution was
initiated by Chairman Dr. Sam Hoff at the request of persons living and working in
Dover. After a very well attended community forum on the topic, it was apparent
that a vast majority of citizens opposed granting full marriage rights to gay men
and women. The Commission subsequently rejected the latter resolution.
However, the DHRC’s attention to the issue may have influenced the direction of
General Assembly passage of anti-discrimination legislation designed to prevent
bias in the public sector within the State of Delaware.
The DHRC continued its commitment to assisting the homeless population
within the City of Dover. In March 2009, two members of the Commission shared
dinner with homeless men at one of the shelters established by the Interfaith Task
Force, itself an outgrowth of the DHRC. The Commission followed immediately
with a meeting at the shelter, where problems and challenges confronting the
homeless were expressed. Subsequently, the Interfaith Task Force was able to
acquire a separate building for use by homeless men together with other resources
which will help to alleviate this recurrent problem.
Page 211
DHRC ANNUAL REPORT FOR 2009 Page 2
During 2009, the DHRC began a review of its mission and bylaws. The
purpose was to make sure that all members of the Commission understood and
agreed with the objectives of the group. Further, because a comprehensive review
of the bylaws had not taken place since 2004, it was deemed necessary to by
Commissioners update the rules. This process will continue during 2010.
At the request of DHRC member Brian Lewis, the Commission passed a
motion requesting the Dover City Council to change its charter to permit sitting
Commissioners to remain on the DHRC if they decide to pursue elective office. In
unanimously endorsing the latter motion, the Commission understood that while it
has a quasi-judicial function with the intake process, the DHRC should not be
singled out for such treatment. Further, the case was made that the run-and-resign
rule had already led to the removal of two Commissioners, thereby negatively
affecting the membership stability of the DHRC. Despite a compromise offered by
Chairman Hoff—which would require a DHRC member to suspend membership
during a campaign for elective office but rejoin the group after the election—the
Dover City Council rejected the motion by a 7-2 vote.
The Commission was indebted to DHRC member Ellen Wasfi, who led a
five-week Study Circle training session for Commissioners on the topic of race.
These meetings, which were held at Dover Police Headquarters and Kent General
Hospital among other venues, encouraged DHRC members to explore their views
and emotions on the topics of bias, prejudice, and racism.
The Commission was aided in its training by Dr. Donald Blakey, a Delaware
State University professor and member of the State House of Representatives.
In January 2010, Chairman Dr. Sam Hoff traveled to Newark, Delaware at
the request of the City Council there in order to outline the steps necessary for
establishing a local Human Relations Commission. The presentation featured a
review of how the DHRC was created and evolved.
At present, the DHRC has five active committees, which are listed below
with the chairs of each:
--Intake Screening: Gregory Bunkley, Chair
--Community Programs: Roy Sudler, Jr., Chair
--School Programs: Ellen Wasfi, Chair
--Assessment: Dr. Phyllis Edamatsu, Chair
--Election Committee: Mark Monroe, Chair
Page 212
DHRC ANNUAL REPORT FOR 2009 Page 3
Other members of the Commission, all of whom have taken an active part in
meetings and activities of the group, are Catherine Gregory, Dawn Allen-Pyne,
Paul Fleming, Ivan Finney. As of the end of January 2010, the Commission had
five vacancies. DHRC members Brian Lewis and Katrina Brumble stepped down
at the end of their regular term. Three other members who served on the
Commission for most or all of 2009—Nauleen Perry, Dr. Saundra Sutton, and
Anlee Baccio-Walker—resigned as well.
The Commission will work with the Mayor and City Council President to
ensure that these openings are filled so that the DHRC may fully represent the
citizens of Dover in 2010 and beyond.
>Composed and submitted by Dr. Sam Hoff, DHRC Chair, on
February 15, 2010.
Page 213
ACTION FORM
PROCEEDING: City Council AGENDA ITEM NO.:
DEPARTMENT OF ORIGIN: Public Utilities – Electric Eng. DATE SUBMITTED: 1-29-2010
PREPARED BY: Ronald H. Lunt, Public Utilities Director
SUBJECT: Evaluation of Proposals – Substation PT & CT Replacement
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: City Manager, Controller
EXHIBITS: Evaluation Summary
EXPENDITURE REQUIRED: $196,345.80 AMOUNT BUDGETED: $260,880
FUNDING SOURCE (Substation PT & CT Replacement): Page 211 in Public Utilities – Electric
Engineering, Substation PT & CT Replacement Project, Account 487-8300-563-70-27, Project # EE1006.
TIMETABLE: Contract to be awarded upon Council approval.
RECOMMENDED ACTION: Staff recommends awarding the proposals to HD Supply for the total amount
of $196,345.80 as outlined in the table below.
BACKGROUND AND ANALYSIS
This project will be replacing aging metering/system protection equipment in the older substations. The
equipment to be replaced includes the Potential Transformers (PT’s) which measures the line voltage and
reduces it to a voltage level the relays can interpret and the Current Transformers (CT’s) which reduces the
current to a level that can safely be measured by the relays and meters; all of which provide electric system
protection. Additionally, the lightning arrestors will be replaced which protects the equipment during
lightning strikes. All of the existing components have exceeded their useful life and are subject to failure,
which could be catastrophic.
A Request for proposals (RFP 10‐0027DPU) was sent out and advertised according to the Purchasing policy by
the City’s Purchasing Agent. We received proposals from three vendors; one vendor included five different
options and manufactures to choose from. Since this was a Request for Proposal staff evaluated the seven
submissions based on the price, reputation of the product, compliance with specifications and delivery.
A point system analysis was performed by three staff members from the Engineering Division to adequately
and impartially evaluate the proposals; with the goal of providing the best product and to serve the interest of
the City of Dover. We have attached a summary of the evaluations for each item.
It should be noted that not all recommended purchases are to the low bidder as the bid award is based on the
evaluations. The following is a summary of the staff recommendation:
Vendor Unit $ Quantity Total $ Eval. Score
69 KV PT HD Supply/Ritz $4,526.32 30 $135,789.60 117
69 KV CT HD Supply/Ritz $4,210.53 8 $33,684.24 117
15 KV PT HD Supply/GE $636.00 7 $4,452.00 112
15 KV CT HD Supply/GE $726.00 3 $2,178.00 112
54 KV Lightning Arrestor HD Supply/Siemens $573.68 30 $17,210.40 103
9 KV lightning Arrestor HD Supply/Siemens $168.42 18 $3,031.56 110
Total Bid Award Value $196,345.80
Page 214
Recommended Proposal WESCO TRENCH HD / GE HD / RITZ HD / COOPER HD / ITEC HD / SIEMENS
Unit $ Quantity Total $ Eval. Score Unit $ Quantity Total $ Eval. Score Unit $ Quantity Total $ Eval. Score Unit $ Quantity Total $ Eval. Score Unit $ Quantity Total $ Eval. Score Unit $ Quantity Total $ Eval. Score Unit $ Quantity Total $ Eval. Score
69 KV PT $4,558.00 30 136,740.00 97 $5,175.00 30 $155,250.00 81 $8,369.00 30 $251,070.00 85 $4,526.32 30 $135,789.60 117 $4,186.58 30 $125,597.40 90
69 KV CT $5,469.00 8 43,752.00 101 $5,750.00 8 $46,000.00 83 $6,549.00 8 $52,392.00 103 $4,210.53 8 $33,684.24 117 $4,691.58 8 $37,532.64 90
15 KV PT $842.00 7 5,894.00 100 $636.00 7 $4,452.00 112 $700.00 7 $4,900.00 111
15 KV CT $802.00 3 2,406.00 102 $726.00 3 $2,178.00 112 $773.68 3 $2,321.04 111
54 KV Lightning Arrestor $405.00 30 $12,150.00 58 $531.00 30 $15,930.00 66 $542.98 30 $16,289.40 67 $573.68 30 $17,210.40 103
9 KV lightning Arrestor $176.00 18 3,168.00 110 $261.00 18 $4,698.00 106 $194.18 18 $3,495.24 102 $168.42 18 $3,031.56 110
Total of all yellow highlighted cells: $196,345.80
Page 215
ACTION FORM
PROCEEDING: Council
DEPARTMENT OF ORIGIN: Parks, Recreation & Library DATE SUBMITTED: February 1, 2010
PREPARED BY: Zachery Carter
SUBJECT: Construction Documents – Dover Public Anchor Library
REFERENCE: N/A
RELATED PROJECT: Design Development Phase Dover Public Anchor Library
REVIEWED BY: City Manager and Controller
EXHIBITS: N/A
EXPENDITURE REQUIRED: $955,275 AMOUNT BUDGETED: $8,912,433
FUNDING SOURCE (Dept./Page in CIP & Budget): Library Reserve & State Grant Parks, Recreation &
Library CIP page 161
TIMETABLE: Construction Document Phase begins March 2010 and completed by November 2010.
RECOMMENDED ACTION: Award the Professional Services contract Construction Document Phase for
the Dover Public Anchor Library to Holzman Moss Bottino Architecture firm for the amount of $955,275.
This amount covers the total expenses and estimated 10 percent project reimbursable expenses.
BACKGROUND AND ANALYSIS
The architectural firms of Holzman Moss Bottino (HMBA) completed the Dover Public Anchor Library Design
Development Phase in January 2010. With the completion of the Design Development Phase, the Library
steering committee is ready to start the next step for the library project.
This is the Construction Development Phase which will include furthering the design development documents
into the final construction documents. This phase will continue the development and coordination of the full-set
of documents including architectural, structural, civil, landscape, mechanical, electrical plumbing and fire
protection engineering documents.
The Construction Document is third and final phase of the design process and is a continuation of the work that
HMBA completed with the Design Development.
Holzman Moss Bottino has done an outstanding job with the building progress, Schematic Design and Design
Development. We recommend to City Council that the proposal for the Professional Services Contract for the
Construction Document Phase for the Dover Public Anchor Library to HMBA for the total (including
reimbursables) sum of $955,275 be accepted and authorization granted to the City Manager to enter into the
contractual agreement.
Page 216
ACTION FORM
U U
PROCEEDING: Utility Committee AGENDA ITEM:
DEPARTMENT OF ORIGIN: Public Utilities DATE SUBMITTED: 1/28/10
PREPARED BY: Ron Lunt, Public Utilities Director
SUBJECT: Retail Customer Demand Response Tariff
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: City Manager, Controller
EXHIBITS: Tariff
EXPENDITURE REQUIRED: $ N/A AMOUNT BUDGETED: $ N/A
FUNDING SOURCE (Dept./Page in CIP & Budget):
TIMETABLE: N/A
RECOMMENDED ACTION: Staff recommends the adoption of the tariff titled Retail Customer
Demand Response Tariff and recognize this as a standard City of Dover Electric Tariff.
BACKGROUND AND ANALYSIS
The Federal Energy Regulatory Commission issued Order No. 719 which attempts in part to remove barriers to
demand response programs operated by Regional Transmission Organizations such as PJM Interconnection,
LLC (PJM). Of specific interest to the City of Dover is a requirement that utilities that sell less than four
million MWh’s must have the relevant electric retail regulatory authority (City Council) approve the
participation of their retail customers in the program. To document and prove that the City of Dover approves
participation in this program staff has created a tariff to allow this action.
The tenets of the PJM operated Demand Response Program (DSP) are to compensate customers that reduce
their consumption during periods of tight energy supply or high usage. The reduction of load also ensures
electric grid reliability and helps alleviate costs associated with new generation plants and transmission
upgrades. Both of which are a concern on the Delmarva Peninsula.
In calendar year 2009, approximately five customers participated in the DSP through various Curtailment
Service Providers’ (CSP) that are registered with PJM. These customers have been removed from the program
by PJM until such time as Dover approves their participation. The City of Dover does not provide the CSP
services; however, the retail customers may choose from a list of registered CSP’s from the PJM website.
The proposed tariff has been reviewed by the City of Dover attorney, Kirk Betts, Betts and Holt, and he
approves this tariff in its final form.
Page 217
RETAIL CUSTOMER DEMAND RESPONSE
AVAILABILITY
The Dover Electric Utility (“Dover”) or its authorized designee is the sole entity permitted to bid demand response
directly into the PJM Interconnection, L.L.C. (“PJM”) (“DR Program”) on behalf of retail customers served by Dover.
Customers served by Dover that intend to bid their DR into PJM prior to that date may do so, provided that such
participation conforms to the terms and conditions in this tariff. No Customer may participate in a DR program of
any other entity unless such entity is a licensed Third Party Demand Response Provider (“DR Provider”).
Dover or its authorized designee may allow a Customer to bid DR into PJM’s ancillary services market for energy
imbalance, spinning reserves, supplemental reserves, reactive power and voltage control, or regulation and
frequency response ancillary services, subject to the same terms and conditions.
.
DR programs may reduce electric service costs for the Customer, provide enhanced usage data, reduce emissions
from electric generation, and provide demand flexibility.
CONTENTS OF APPLICATION
Customer shall submit to Dover a written request to participate that includes the following: 1) Copy of DR Provider
license or certification and a contract between the DR Provider and Customer; 2) Name of the DR program and
evidence of regulatory approval; 3) Metering requirements for participation; and 4) The DR contract must include
the following provision: “This contract shall terminate without penalty on no less than one year’s written notice from
Dover to the Customer stating that Dover or its authorized designee will assume DR Program management.”
Dover’s approval of the application shall be granted within fourteen (14) days.
EFFECT OF APPLICATION AND PARTICIPATION IN DR PROGRAM
Dover’s receipt and review of any documentation submitted by a Customer shall not constitute approval of such DR
Provider or a guarantee of performance or payment by a DR Provider, nor shall Dover be liable for ANY damages
sustained by the Customer.
RIGHT TO TERMINATE PARTICIPATION IN DR PROGRAM
Dover reserves the right to disapprove a request to participate in a DR program or to terminate participation by a
Customer when, in Dover’s sole discretion, Dover determines that participation by the Customer will be detrimental
to another customer or to the City of Dover.
SPECIAL METERING REQUIREMENTS
If Customer requires special metering equipment or devices to participate in the DR program, Customer shall
provide the specifications for such equipment or devices in writing to the Dover Electric Department at the time of
application or promptly thereafter. Within fourteen (14) days thereafter, Dover will provide the Customer with an
estimate of the cost of the special metering equipment or devices and an estimate of the cost of providing special
meter reading data. The cost of any special metering equipment or device shall be the responsibility of the
Customer and shall be paid prior to the scheduled installation date. All costs for data or special readings shall be
billed to Customer monthly.
Page 218
1
2
3 LETTER IN OPPOSITION OF HOUSE BILL #194
4
5
6 February XX, 2010
7
8
9 Name
10 Address
11 City
12
13
14 Dear Legislator,
15
16 I am writing to express strong opposition to the addition of new gambling venues in the state of Delaware, as
17 proposed by House Bill #194. As a concerned voter, businessperson, and civic leader in The Greater Dover
18 Committee, I urge you to reject the proposal, as it would be detrimental not only to Kent County, but to Delaware as
19 a whole.
20
21 Expanding the number of Delaware gaming venues would negatively impact employees at all three racinos in our
22 state and only serve to cut the same size pie into smaller pieces. In essence, it would dilute an already watered-down
23 revenue stream for the state, while harming the long-term viability of the existing racinos and the establishments that
24 rely on them. The overall quality of life in Harrington and the greater Dover community would surely suffer as a
25 result of Bill #194.
26
27 Most alarmingly, the legislation could lead to a catastrophic collapse of Harrington Raceway and Casino, the city’s
28 biggest employer and one of the largest organizations in Kent County. The addition of new venues would only
29 exacerbate the financial difficulties Harrington Raceway and other local businesses currently face; potentially
30 forcing them to close shop, trim operations or move elsewhere. Passing HB #194 could also lead to the reduction of
31 contributions by the Mid-Del Charitable Foundation, which supports many important Delaware organizations and
32 activities, and have an impact on the Delaware State Fair, which attracted 282,000 attendees in 2009.
33
34 As a member of the Greater Dover Committee, I passionately oppose HB #194. Our Committee is a non-
35 profit membership organization created by CEO and top business executives in the greater Dover area to
36 identify emerging community issues and to take on projects that will improve the quality of life for the
37 residents of greater Dover. With that said, our organization feels obligated to take a strong and informed
38 stand against this measure.
39
40 The addition of new gambling venues would not just impact the Harrington and Dover area businesses negatively,
41 however. The entire state of Delaware would suffer as a result of this proposed Bill. These new gaming facilities
42 represent a short-sighted stop gap measure and do not provide the long-term strategy required to solve Delaware’s
43 budgetary issues. With more gaming facilities, the market as we know it will become oversaturated and lead to
44 diminished returns for everyone involved. This Bill stands to benefit no one.
45
46 The Business leaders of Dover, your constituents, do not support this bill. Thank you for your time and careful
47 consideration of these issues.
48
49 Respectfully, Respectfully,
50
51
52
53 Carleton E. Carey, Sr. Beverly C. Williams
54 Mayor Council President
55
56
57
Page 219
PETITION TO AMEND AND ZONING DISTRICT
First Reading before the Dover City Council
February 22, 2009
Applicants/Owners: TLFD Management, LLC
Location: White Oak Road
Tax Parcel ID #: ED-05-068.00-01-18.00-000
Size: 12.78+/- acres
Present Use: Vacant
Proposed Use: Residential
Comprehensive
Plan Designation: Residential Low Density
Present Zoning: R-20 (One Family Residence Zone)
Proposed Zoning: R-8 (One Family Residence Zone)
Reason for Request: To construct single family residential dwellings
File Number: Z-10-01
Page 220
City of Dover Application No.: Z-10-01
Department of Planning & Inspections
IPM
R-8
IPM-2
Site
R-20
RM-2
A
Plan Title: Lands of JNK, LLC
Location: White Oak Road Legend
Plan Type: Rezoning Dover Boundary
Tax Parcel: ED-05-068.00-01-18.00-000
Zoning: R-20 current, R-8 proposed Dover Parcels
Owner: TLFD Management, LLC
Zoning
Date: 2-17-10
SWPOZ Tier 2
0 250 500 1,000 Feet
«
Page 221
FIRST READING
CITY OF DOVER
PROPOSED ORDINANCE #2010-04
1 AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
2 CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
3 ON THE SOUTH SIDE OF WHITE OAK ROAD, SOUTH OF MOURNING DOVE LANE
4 (LC05-068.00-01-18.00-000).
5 WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property within
6 the limits of the City of Dover; and
7 WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use of
8 property described below from R-20 (One Family Residence Zone) and SWPOZ (Source Water
9 Protection Overlay Zone) to R-8 (One Family Residence Zone) and SWPOZ (Source Water
10 Protection Overlay Zone).
11 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
12 DOVER, IN COUNCIL MET:
13 1. That from and after the passage and approval of this ordinance the Zoning Map and Zoning
14 Ordinance of the City of Dover have been amended by changing the zoning designation from
15 R-20 (One Family Residence Zone) and SWPOZ (Source Water Protection Overlay Zone)
16 to R-8 (One Family Residence Zone) and SWPOZ (Source Water Protection Overlay Zone)
17 on that property located on the south side of White Oak Road, south of Mourning Dove Lane
+/
18 (LC05-068.00-01-18.00-000) consisting of 12.78 acres, owned by TLFD Management, LLC.
19
20 ADOPTED: *
21 S:\ClerksOffice\Rezonings\2010\White Oak Road - South Side\Ordinance-White Oak Road-South Side-1st Rdg.wpd
22
Page 222
FIRST READING
CITY OF DOVER PROPOSED ORDINANCE #2010-05 WITH AMENDMENT NO. 1
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Chapter 2 - Administration, Article VI - Other Post-Employment Benefits Fund, be amended by
4 inserting a new Section 2-505 - Medicare Part B Premium Reimbursements, as follows:
5 Sec. 2-505. Medicare Part B Premium Reimbursements
6 On July 27, 2009, Counci1 approved the recommendation of the Legislative, Finance, and
7 Administration Committee's recommendation not to provide for Medicare Part B premium
8 reimbursement for all non-bargaining employees which applied only to new hires after July 27, 2009.
9 The City currently provides Medicare Part B premium reimbursement for all other non-bargaining
10 employees and the Legislative, Finance, and Administration Committee recommends that this practice
11 be continued provided that it is clearly stated and understood that the decision of Council, if approved
12 by Council, is not vested and can be changed or eliminated at any time can be reevaluated annually
13 for changes or elimination.
14 The City of Dover shall continue to provide Medicare Part B premium reimbursements for all
15 non-bargaining employees other than those new hires after July 27, 2009, as it has done in the past,
16 provided that this is not to be considered a vested right and can be changed or eliminated by Council
17 at any time by ordinance,with a public hearing, or resolution and with a 90-day written notice to those
18 employees who are currently receiving or who are eligible for Medicare Part B Reimbursement,
19 enacted to that effect and, further, that as required by the Charter, Section 3, the fund for payment of the
20 costs of such premium reimbursement shall be continued as in the past.
21 SYNOPSIS
22 The City in the past has provided to all non-bargaining employees Medicare Part B
23 premium reimbursement. On July 27, 2009, Council adopted an ordinance that
24 terminated such premium reimbursement for non-bargaining employees hired on or after
25 July 27, 2009. The effect of this ordinance is to reaffirm the position of the City to
26 continue to provide Medicare Part B premium reimbursement for all non-bargaining
27 employees hired previous to July 27, 2009, with the complete and absolute
28 understanding that this decision of Council does not convey or establish any vested right
29 to non-bargaining employees to receive this premium reimbursement in the future and
30 that such decision of premium reimbursement may be changed or eliminated by Council
31 at any time.
32 ADOPTED: *
33 S:\ClerksOffice\PACKETS\2010\Council\02-08-2010\Ordinance 2010-05 with Amend No. 1.wpd
34 Actions History
35 January 25, 2010 - Legislative, Finance, and Administration Committee
Page 223
36 SUBPART A - CHARTER, ARTICLE I - POWERS OF THE CITY, SECTION 3 - EMPLOYEE
37 PENSION, BENEFIT AND RETIREMENT SYSTEMS AUTHORIZED
38 (Provided for Reference Only)
39 Sec. 3. Employee pension, benefit and retirement systems authorized.
40 The City of Dover is hereby authorized, empowered and permitted to establish a system of pensions or
41 benefits through group insurance or otherwise as may be found proper and necessary, providing for life,
42 accident, health, hospitalization and death benefits, or any or either of them, for the regular employees
43 of the said "City of Dover." The said "City of Dover" is hereby authorized, empowered and permitted
44 to enter into an agreement or agreements with one or more insurance companies to provide a group
45 insurance plan or plans, as may be required or proper to carry out such system of pensions or benefits.
46 The election to exercise such authority on the part of the city shall be evidenced by an ordinance or
47 resolution duly adopted by the council of the City of Dover as other ordinances or resolutions are
48 adopted, and the same shall be recorded in the official minutes of the said council. Such ordinance or
49 resolution shall provide for and establish a fund for the payment of the costs of such pension system or
50 benefits by making appropriations out of the treasury of the said "City of Dover," or by requiring
51 contributions payable from time to time by the employees included in such plan or plans, or by a
52 combination of both, or by any other method not prohibited by law. The participation in any plan
53 adopted shall be deemed to be mandatory by the City of Dover and made a condition of employment
54 and continuing employment.
55 The city council shall have power to enact ordinances for a pension or retirement system for the police
56 of the City of Dover, and to set aside a special fund for that purpose which fund shall be administered
57 in accordance with ordinances made and provided in that behalf and the laws of the State of Delaware.
58 Notwithstanding any statute to the contrary, the City of Dover shall have the power by ordinance to
59 impose and collect a tax, to be paid by the transferor or transferee as determined by council, upon the
60 transfer of real property within the city not to exceed one and one-half percent or as amended by state
61 law of the value of the real property as represented by the document transferring the property. The
62 provisions of Section 5401 and Section 5403 of Chapter 54, Title 30 of the Delaware Code (30 Del. C.
63 §§ 5401, 5403) shall apply with respect to any realty transfer tax imposed by the City of Dover pursuant
64 to the authority granted herein. The council of the City of Dover may adopt an ordinance or ordinances
65 to provide for the effective administration and regulation of any tax adopted pursuant to the authority
66 conferred herein. If the taxing power and authority granted herein shall be exercised by way of a stamp
67 affixed to a document, the recorder of deeds in and for Kent County shall not receive for record
68 documents subject to said tax unless stamps provided by the City of Dover are affixed thereto showing
69 payment of the tax.
70 (Amd. of 7-12-2005 (S.B. 126); Amd. of 7-8-2009 (S.B. 165, § 4))
Page 224
FINAL READING
CITY OF DOVER PROPOSED ORDINANCE #2010-03
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
2 The amounts hereinafter named in various City funds are changed from the currently approved
3 revenues/receipts and appropriations to the revised revenues/receipts and revised appropriations for use
4 by the various departments of the Municipal Government for:
5 2009 - 2010 BUDGET ORDINANCES
6 GENERAL FUND
7 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
8 Info Only Revised
9 2009/10 2009/10
10 CASH RECEIPTS ESTIMATES BUDGET BUDGET
11 PRIOR YEAR BALANCE 2,816,763 3,628,890
12 FINES AND POLICE REVENUE 620,000 620,000
13 911 FEE 45,000 45,000
14 INVESTMENT INCOME 253,000 253,000
15 LIBRARY REVENUES 66,508 66,508
16 KENT COUNTY BOOK REIMBURSEMENT 460,000 460,000
17 BUSINESS LICENSES 1,430,000 1,430,000
18 PERMITS AND OTHER LICENSES 904,000 904,000
19 MISCELLANEOUS CHARGES 54,250 54,250
20 POLICE EXTRA DUTY 300,000 300,000
21 PROPERTY TAXES 10,185,246 10,185,246
22 BID REVENUE 52,692 52,692
23 RECREATION REVENUE 141,500 141,500
24 FRANCHISE FEE 486,000 486,000
25 TRASH FEES 1,260,000 1,260,000
26 DSWA TRASH FEE REBATE 160,000 160,000
27 RENT REVENUE - GARRISON FARM 41,535 41,535
28 COURT OF CHANCERY FEES 745,000 745,000
29 INTRAFUND SERVICE RECEIPTS W/WW 991,830 991,830
30 INTRAFUND SERVICE RECEIPTS ELECTRIC 3,483,884 3,483,884
31 GRANTS:
32 POLICE RELATED 40,000 40,000
33 POLICE PENSION GRANTS 620,000 620,000
34 CAPITAL SCHOOL DISTRICT REVENUE 74,000 74,000
35 TRANSFERS FROM:
36 TRANSFER TAX 1,400,000 1,400,000
37 MUNICIPAL STREET AID 775,200 -
38 CIVIL TRAFFIC PENALTIES 700,000 700,000
39 WATER/WASTEWATER 548,020 548,020
40 ELECTRIC 6,758,100 6,758,100
41 TOTALS 35,412,528 35,449,455
Page 225
Page 2 of 16 FINAL READING
42 2009 - 2010 BUDGET ORDINANCES
43 GENERAL FUND - CONTINUED
44 Info Only Revised
45 EXPENDITURE SUMMARY 2009/10 2009/10
46 BUDGET BUDGET
47 DEPARTMENT EXPENSES:
48 CITY CLERK 290,580 290,580
49 COUNCIL 112,684 112,684
50 TAX ASSESSOR 572,526 572,526
51 FIRE 750,445 750,445
52 GROUNDS MAINTENANCE 1,119,611 1,119,611
53 LIBRARY 1,148,716 1,148,716
54 RECREATION 757,467 757,467
55 LIFE SAFETY 422,029 422,029
56 CODE INFORCEMENT 378,092 378,092
57 PLANNING 409,335 409,335
58 INSPECTIONS 517,316 517,316
59 ECONOMIC DEVELOPMENT 243,854 243,854
60 POLICE 11,739,470 11,769,685
61 POLICE EXTRA DUTY 449,516 449,516
62 STREETS 857,422 857,422
63 SANITATION 2,200,285 2,200,285
64 CITY MANAGER 553,130 553,130
65 INFORMATION TECHNOLOGY 883,075 883,075
66 FINANCE 781,791 781,791
67 PUBLIC SERVICES - ADMINISTRATION 355,159 355,159
68 FACILITIES MANAGEMENT 1,042,498 1,042,498
69 CENTRAL SERVICES 778,095 778,095
70 FLEET MAINTENANCE 699,676 699,676
71 CUSTOMER SERVICES 893,054 893,054
72 HUMAN RESOURCES 451,960 455,960
73 MAYOR 69,899 69,899
74 OTHER EXPENDITURES:
75 DEBT SERVICE 328,410 328,410
76 INSURANCE 600,000 600,000
77 RETIREES HEALTH CARE 1,014,820 1,014,820
78 UNCOLLECTIBLES - TRASH AND OTHER 10,000 10,000
79 STREET LIGHTS 985,000 985,000
80 TRANSFER TO CAPITAL PROJECT FUND 344,802 344,802
81 TRANSFER TO PENSION TRUST 620,000 620,000
82 TRANSFER TO CDBG FUND 11,000 11,000
83 CURRENT YEAR BALANCE 3,020,811 3,023,523
84 TOTALS 35,412,528 35,449,455
Page 226
Page 3 of 16 FINAL READING
85 2009 - 2010 BUDGET ORDINANCES
86 GENERAL CONTINGENCY FUND
87 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
88 Info Only Revised
89 2009/10 2009/10
90 CASH RECEIPTS ESTIMATES BUDGET BUDGET
91 BEGINNING BALANCE 645,254 744,871
92 TOTALS 645,254 744,871
93 EXPENDITURE ESTIMATES
94 CARRY FORWARD TO NEXT YEAR 645,254 744,871
95 TOTALS 645,254 744,871
96 2009 - 2010 BUDGET ORDINANCES
97 GOVERNMENTAL CAPITAL PROJECTS FUND
98 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
99 Info Only Revised
100 2009/10 2009/10
101 CASH RECEIPTS ESTIMATES BUDGET BUDGET
102 BEGINNING BALANCE 375,408 462,693
103 STATE GRANTS 4,000,000 4,180,234
104 INTEREST EARNINGS 2,700 2,700
105 BOND PROCEEDS 1,912,433 1,912,433
106 TRANSFER FROM GENERAL FUND 344,802 344,802
107 TRANSFER FROM LIBRARY RESERVE 3,000,000 3,180,235
108 TOTALS 9,635,343 10,083,097
109 EXPENDITURE SUMMARY
110 FIRE 292,210 292,210
111 LIBRARY 8,912,433 9,272,902
112 RECREATION - 70,000
113 POLICE 73,700 94,706
114 STREETS 350,000 350,000
115 INFORMATION TECHNOLOGY 7,000 7,000
116 CURRENT YEAR BALANCE - (3,721)
117 TOTALS 9,635,343 10,083,097
Page 227
Page 4 of 16 FINAL READING
118 2009 - 2010 BUDGET ORDINANCES
119 GENERAL CAPITAL ASSET REPLACEMENT RESERVE
120 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
121 Info Only Revised
122 2009/10 2009/10
123 CASH RECEIPTS ESTIMATES BUDGET BUDGET
124 BEGINNING BALANCE 235,074 327,369
125 INTEREST EARNINGS 7,000 7,000
126 TOTALS 242,074 334,369
127 EXPENDITURE ESTIMATES
128 CARRY FORWARD TO NEXT YEAR 242,074 334,369
129 TOTALS 242,074 334,369
130 2009 - 2010 BUDGET ORDINANCES
131 WATER/WASTEWATER FUND
132 REVENUES AND EXPENSES FOR 2009 - 2010
133 Info Only Revised
134 2009/10 2009/10
135 REVENUE ESTIMATES BUDGET BUDGET
136 PRIOR YEAR BALANCE - WATER 662,079 659,584
137 PRIOR YEAR BALANCE - WASTEWATER 307,112 327,614
138 PRIOR YEAR BALANCE - KCSA 100,194 (397,473)
139 WATER FEES 4,499,000 4,499,000
140 WASTEWATER FEES 3,045,560 3,045,560
141 WASTEWATER ADJUSTMENT FEES 3,435,390 3,435,390
142 WATER TANK SPACE LEASING 293,669 293,669
143 SEWER IMPACT FEES 475,000 475,000
144 WATER IMPACT FEES 280,000 280,000
145 INTEREST EARNINGS - WATER 35,370 35,370
146 INTEREST EARNINGS - WASTEWATER 43,230 43,230
147 MISCELLANEOUS SERVICE FEE 71,000 71,000
148 TOTALS 13,247,604 12,767,944
Page 228
Page 5 of 16 FINAL READING
149 2009 - 2010 BUDGET ORDINANCES
150 WATER/WASTEWATER FUND - CONTINUED
151 Info Only Revised
152 EXPENSE SUMMARY 2009/10 2009/10
153 BUDGET BUDGET
154 DIRECT EXPENSES:
155 ENGINEERING & INSPECTION 697,783 697,783
156 WATER CONSTRUCTION 410,338 410,338
157 WATER DEPARTMENT 458,333 458,333
158 WATER TREATMENT PLANT 1,517,663 1,517,663
159 WASTEWATER DEPARTMENT 988,455 988,455
160 METER READING 72,533 72,533
161 KENT COUNTY TREATMENT CHARGE 3,435,430 3,435,430
162 DIRECT EXPENDITURE SUBTOTALS 7,580,535 7,580,535
163 OTHER EXPENSES:
164 DEBT SERVICE - WATER 468,013 468,013
165 DEBT SERVICE - WASTEWATER 364,938 364,938
166 RETIREES HEALTH CARE 134,680 134,680
167 INTRAFUND SERVICE FEES 1,262,456 1,262,456
168 TRANSFER TO:
169 GENERAL FUND FROM WATER 231,459 231,459
170 GENERAL FUND FROM WASTEWATER 316,561 316,561
171 WATER IMP AND EXT 500,000 500,000
172 WASTEWATER IMP AND EXT 200,000 200,000
173 SEWER IMPACT FEE RESERVE 110,062 110,062
174 CURRENT YEAR BALANCE WATER 1,136,086 1,133,591
175 CURRENT YEAR BALANCE WASTEWATER 842,660 863,162
176 CURRENT YEAR BALANCE KCSA 100,154 (397,513)
177 OTHER EXPENSES SUBTOTALS 3,588,169 3,588,169
178 TOTALS 13,247,604 12,767,944
Page 229
Page 6 of 16 FINAL READING
179 2009 - 2010 BUDGET ORDINANCES
180 WATER/WASTEWATER CONTINGENCY RESERVE
181 SOURCES AND USES OF FUNDS 2009 - 2010
182 Info Only Revised
183 2009/10 2009/10
184 SOURCE OF FUNDS BUDGET BUDGET
185 PRIOR YEAR BALANCE - WATER 118,292 118,780
186 PRIOR YEAR BALANCE - WASTEWATER 132,279 132,821
187 INTEREST EARNINGS 8,770 8,770
188 TOTALS 259,341 260,371
189 USE OF FUNDS
190 CURRENT YEAR BALANCE - WATER 122,431 122,919
191 CURRENT YEAR BALANCE - WASTEWATER 136,910 137,452
192 TOTALS 259,341 260,371
193 2009 - 2010 BUDGET ORDINANCES
194 WATER/WASTEWATER IMPROVEMENT & EXTENSION FUND
195 REVENUES AND EXPENSES FOR 2009 - 2010
196 Info Only Revised
197 2009/10 2009/10
198 REVENUE ESTIMATES BUDGET BUDGET
199 PRIOR YEAR BALANCE - WATER 431,400 1,631,844
200 PRIOR YEAR BALANCE - WASTEWATER 219,375 625,152
201 TRANS FR WATER OPERATING FUND 500,000 500,000
202 TRANS FR WASTEWATER OPERATING FUND 200,000 200,000
203 TRANS FR WASTEWATER IMPACT FEE RESERVE 518,230 518,230
204 WATER - STATE REVOLVING LOAN PROCEEDS 2,404,017 2,404,017
205 WASTEWATER - STATE REVOLVING LOAN PROCEEDS 5,942,481 5,942,481
206 FEDERAL/STATE GRANTS - 45,248
207 TOTALS 10,215,503 11,866,972
208 EXPENSE SUMMARY
209 WATER 2,987,317 3,753,430
210 WASTEWATER 6,539,110 6,912,942
211 WATER CONSTRUCTION 39,000 39,000
212 CURRENT YEAR BALANCE - WATER 309,100 753,431
213 CURRENT YEAR BALANCE - WASTEWATER 340,976 408,169
214 TOTALS 10,215,503 11,866,972
Page 230
Page 7 of 16 FINAL READING
215 2009 - 2010 BUDGET ORDINANCES
216 WATER/WASTEWATER CAPITAL ASSET RESERVE ACCOUNT
217 SOURCES AND USES OF FUNDS FOR 2009 - 2010
218 Info Only Revised
219 2009/10 2009/10
220 SOURCE OF FUNDS BUDGET BUDGET
221 BEGINNING BALANCE WATER 178,452 205,611
222 BEGINNING BALANCE WASTEWATER 84,403 64,560
223 INTEREST EARNINGS - WATER 6,246 6,246
224 INTEREST EARNINGS - WASTEWATER 2,954 2,954
225 TOTALS 272,055 279,371
226 USE OF FUNDS
227 CARRY FORWARD TO NEXT YEAR WATER 184,698 211,857
228 CARRY FORWARD TO NEXT YEAR WASTEWATER 87,357 67,514
229 TOTALS 272,055 279,371
230 2009 - 2010 BUDGET ORDINANCES
231 ELECTRIC REVENUE FUND
232 REVENUES AND EXPENSES FOR 2009 - 2010
233 Info Only Revised
234 2009/10 2009/10
235 REVENUE ESTIMATES BUDGET BUDGET
236 PRIOR YEAR BALANCE 8,219,350 11,415,737
237 DIRECT SALES TO CUSTOMER 99,533,042 99,533,042
238 UTILITY TAX 1,781,500 1,781,500
239 GREEN ENERGY 137,600 137,600
240 MISCELLANEOUS REVENUE 1,051,184 1,051,184
241 RENT REVENUE 186,816 186,816
242 EMISSION CREDIT SALES 274,000 274,000
243 INTRAFUND SERVICE RECEIPTS W/WW FUND 270,626 270,626
244 INTEREST EARNINGS 158,500 158,500
245 TOTALS 111,612,618 114,809,005
Page 231
Page 8 of 16 FINAL READING
246 2009-2010 BUDGET ORDINANCES
247 ELECTRIC REVENUE FUND - CONTINUED
248 Info Only Revised
249 EXPENSE SUMMARY 2009/10 2009/10
250 BUDGET BUDGET
251 DIRECT EXPENSES:
252 POWER SUPPLY 55,619,481 55,619,481
253 POWER SUPPLY MANAGEMENT 3,000,000 3,000,000
254 PJM CHARGES - LOAD 13,943,413 13,943,413
255 CAPACITY CHARGES 13,469,528 13,469,528
256 RATE STABILIZATION CREDIT (3,000,000) (3,000,000)
257 SUBTOTAL POWER SUPPLY 83,032,422 83,032,422
258 PLANT OPERATIONS 5,798,710 5,848,710
259 GENERATIONS FUELS 1,275,251 1,275,251
260 PJM CREDITS (1,701,066) (1,701,066)
261 CAPACITY CREDITS (12,133,285) (12,133,285)
262 GENERATION SUBTOTAL (6,760,390) (6,710,390)
263 POWER SUPPLY & GENERATION SUBTOTAL 76,272,032 76,322,032
264 TRANSITION COSTS
265 TRANSMISSION/DISTRIBUTION 3,318,622 3,318,622
266 ELECTRICAL ENGINEERING 1,500,012 1,500,012
267 ADMINISTRATION 640,535 640,535
268 METER READING 289,103 289,103
269 SYSTEMS OPERATIONS 624,520 624,520
270 UTILITY TAX 1,781,500 1,781,500
271 DIRECT EXPENSE SUBTOTALS 84,426,324 84,476,324
272 OTHER EXPENSES:
273 ALLOW FOR UNCOLLECTIBLES 135,000 135,000
274 RETIREES HEALTH CARE 567,430 567,430
275 GREEN ENERGY PAYMENT TO DEMEC 137,600 137,600
276 INTRAFUND SERVICE FEES 3,483,884 3,483,884
277 INTEREST ON DEPOSITS 54,500 54,500
278 INVENTORY WRITE OFFS 175,000 175,000
279 POWER SUPPLY STUDY 497,250 497,250
280 DEBT SERVICE 3,956,600 3,956,600
281 TRANSFER TO:
282 IMPROVEMENT & EXTENSION 2,500,000 2,500,000
283 GENERAL FUND 6,758,100 6,758,100
284 CONTINGENCY RESERVE 83,500 83,500
285 CURRENT YEAR BALANCE 8,837,430 11,983,817
286 TOTALS 111,612,618 114,809,005
Page 232
Page 9 of 16 FINAL READING
287 2009 - 2010 BUDGET ORDINANCES
288 ELECTRIC UTILITY IMPROVEMENT AND EXTENSION FUND
289 REVENUES AND EXPENSES FOR 2009 - 2010
290 Info Only Revised
291 2009/10 2009/10
292 REVENUE ESTIMATES BUDGET BUDGET
293 PRIOR YEAR BALANCE 1,461,547 2,625,760
294 PRIOR YEAR BALANCE BOND PROCEEDS 1,378,257 4,240,034
295 INTEREST EARNINGS 33,700 33,700
296 STATE REIMBURSEMENT FOR GOVS AVE - 710,318
297 STATE GRANTS - 105,723
298 FEDERAL GRANTS - 135,152
299 BOND ISSUE 2008 1,958,107 -
300 TRANSFER FROM ELECTRIC 2,500,000 2,500,000
301 TOTALS 7,331,611 10,350,687
302 EXPENSE SUMMARY
303 ELECTRIC GENERATION 1,254,000 1,875,290
304 TRANSMISSION AND DISTRIBUTION 1,127,147 1,127,147
305 ELECTRICAL ENGINEERING 3,525,536 5,642,167
306 ELECTRICAL ADMINISTRATION - 105,723
307 CURRENT YEAR BALANCE 1,424,928 1,600,360
308 CURRENT YEAR BALANCE -BOND - -
309 TOTALS 7,331,611 10,350,687
310 2009 - 2010 BUDGET ORDINANCES
311 ELECTRIC CONTINGENCY RESERVE ACCOUNT
312 SOURCES AND USES OF FUNDS FOR 2009 - 2010
313 Info Only Revised
314 2009/10 2009/10
315 SOURCE OF FUNDS BUDGET BUDGET
316 BEGINNING BALANCE 927,869 928,654
317 INTEREST EARNINGS 27,700 27,700
318 TRANSFER FROM ELECTRIC REVENUE FUND 83,500 83,500
319 TOTALS 1,039,069 1,039,854
320 USE OF FUNDS
321 CARRY FORWARD TO NEXT YEAR 1,039,069 1,039,854
322 TOTALS 1,039,069 1,039,854
Page 233
Page 10 of 16 FINAL READING
323 2009 - 2010 BUDGET ORDINANCES
324 ELECTRIC DEPRECIATION RESERVE ACCOUNT
325 SOURCES AND USES OF FUNDS FOR 2009 - 2010
326 Info Only Revised
327 2009/10 2009/10
328 SOURCE OF FUNDS BUDGET BUDGET
329 PRIOR YEAR BALANCE 7,701,763 7,789,990
330 INTEREST EARNINGS 290,000 290,000
331 TOTALS 7,991,763 8,079,990
332 USE OF FUNDS
333 CURRENT YEAR BALANCE 7,991,763 8,079,990
334 TOTALS 7,991,763 8,079,990
335 2009 - 2010 BUDGET ORDINANCES
336 FUTURE CAPACITY RESERVE ACCOUNT
337 SOURCES AND USES OF FUNDS FOR 2009 - 2010
338 Info Only Revised
339 2009/10 2009/10
340 SOURCE OF FUNDS BUDGET BUDGET
341 PRIOR YEAR BALANCE 8,640,651 8,763,863
342 INTEREST EARNINGS 260,000 260,000
343 TOTALS 8,900,651 9,023,863
344 USE OF FUNDS
345 CURRENT YEAR BALANCE 8,900,651 9,023,863
346 TOTALS 8,900,651 9,023,863
Page 234
Page 11 of 16 FINAL READING
347 2009 - 2010 BUDGET ORDINANCES
348 INSURANCE STABILIZATION RESERVE ACCOUNT
349 SOURCES AND USES OF FUNDS FOR 2009 - 2010
350 Info Only Revised
351 2009/10 2009/10
352 SOURCE OF FUNDS BUDGET BUDGET
353 PRIOR YEAR BALANCE 383,502 385,103
354 INTEREST EARNINGS 11,500 11,500
355 TOTALS 395,002 396,603
356 USE OF FUNDS
357 CURRENT YEAR BALANCE 395,002 396,603
358 TOTALS 395,002 396,603
359 2009 - 2010 BUDGET ORDINANCES
360 ELECTRIC RATE STABILIZATION RESERVE ACCOUNT
361 SOURCES AND USES OF FUNDS FOR 2009 - 2010
362 Info Only Revised
363 2009/10 2009/10
364 SOURCE OF FUNDS BUDGET BUDGET
365 PRIOR YEAR BALANCE 4,642,013 4,652,527
366 INTEREST EARNINGS 76,600 76,600
367 TOTALS 4,718,613 4,729,127
368 BUDGET SUMMARY
369 TRANSFER TO ELECTRIC FUND 3,000,000 3,000,000
370 CURRENT YEAR BALANCE 1,718,613 1,729,127
371 TOTALS 4,718,613 4,729,127
Page 235
Page 12 of 16 FINAL READING
372 2009 - 2010 BUDGET ORDINANCES
373 MUNICIPAL STREET AID FUND
374 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
375 Info Only Revised
376 2009/10 2009/10
377 CASH RECEIPTS ESTIMATES BUDGET BUDGET
378 BEGINNING BALANCE 107 428
379 STATE GRANT 775,000 -
380 INTEREST EARNED 200 -
381 TOTALS 775,307 428
382 EXPENDITURE ESTIMATES
383 TRANSFER TO GENERAL FUND 775,200 -
384 CURRENT YEAR BALANCE 107 428
385 TOTALS 775,307 428
386 2009 - 2010 BUDGET ORDINANCES
387 WORKER'S COMPENSATION FUND
388 REVENUES AND EXPENSES FOR 2009 - 2010
389 Info Only Revised
390 2009/10 2009/10
391 REVENUE ESTIMATES BUDGET BUDGET
392 PRIOR YEAR BALANCE 1,404,956 1,278,611
393 INTEREST INCOME 46,300 46,300
394 PREMIUM FROM CITY 753,822 753,822
395 TOTALS 2,205,078 2,078,733
396 EXPENSE ESTIMATES
397 PROGRAM EXPENSES - CLAIMS 450,000 450,000
398 INSURANCE 93,400 93,400
399 BANK FEES 1,300 1,300
400 STATE OF DEL - SELF INSURANCE TAX 50,000 50,000
401 CONTRACTUAL SERVICES 37,000 37,000
402 CURRENT YEAR BALANCE 1,573,378 1,447,033
403 TOTALS 2,205,078 2,078,733
Page 236
Page 13 of 16 FINAL READING
404 2009 - 2010 BUDGET ORDINANCES
405 OTHER POST EMPLOYMENT BENEFITS FUND (Closed with annual audit)
406 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
407 In May 2009 Council adopted a OPEB Trust - all assets were transferred to the Trust
408 Info Only Revised
409 2009/10 2009/10
410 CASH RECEIPTS ESTIMATES BUDGET BUDGET
411 PRIOR YEAR BALANCE 4,752,552 -
412 INTEREST INCOME 135,000 -
413 TOTALS 4,887,552 -
414 EXPENDITURE ESTIMATES
415 CURRENT YEAR BALANCE 4,887,552 -
416 TOTALS 4,887,552 -
417 2009 - 2010 BUDGET ORDINANCES
418 COMMUNITY TRANSPORTATION IMPROVEMENT FUND
419 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
420 Info Only Revised
421 2009/10 2009/10
422 CASH RECEIPTS ESTIMATES BUDGET BUDGET
423 PRIOR YEAR BALANCE 108,812 270,803
424 GRANTS REVENUE - STATE LEGISLATORS 1,000,000 1,000,000
425 TRANSFER FROM GOVT CAP PROJECTS FUND 350,000 300,000
426 INTEREST INCOME 2,800 2,800
427 TOTALS 1,461,612 1,573,603
428 EXPENDITURE ESTIMATES
429 PROGRAM EXPENSES 1,350,000 1,472,690
430 CURRENT YEAR BALANCE 111,612 100,913
431 TOTALS 1,461,612 1,573,603
Page 237
Page 14 of 16 FINAL READING
432 2009 - 2010 BUDGET ORDINANCES
433 PARKLAND/RECREATION RESERVE ACCOUNT
434 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
435 Info Only Revised
436 2009/10 2009/10
437 SOURCE OF FUNDS BUDGET BUDGET
438 PRIOR YEAR BALANCE 192,735 218,245
439 TOTALS 192,735 218,245
440 USES OF FUNDS
441 CURRENT YEAR BALANCE 192,735 218,245
442 TOTALS 192,735 218,245
443 2009 - 2010 BUDGET ORDINANCES
444 LIBRARY RESERVE ACCOUNT
445 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
446 Info Only Revised
447 2009/10 2009/10
448 SOURCE OF FUNDS BUDGET BUDGET
449 PRIOR YEAR BALANCE 3,309,400 3,554,078
450 INTEREST INCOME 117,000 117,000
451 TOTALS 3,426,400 3,671,078
452 USE OF FUNDS
453 TRANSFER TO CAPITAL PROJECT FUND 3,000,000 3,180,235
454 CURRENT YEAR BALANCE 426,400 490,843
455 TOTALS 3,426,400 3,671,078
Page 238
Page 15 of 16 FINAL READING
456 2009 - 2010 BUDGET ORDINANCES
457 LIBRARY GRANTS
458 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
459 Info Only Revised
460 2009/10 2009/10
461 RECEIPT ESTIMATES BUDGET BUDGET
462 PRIOR YEAR BALANCE 133 16,336
463 STATE GRANT 247,801 247,801
464 TOTALS 247,934 264,137
465 EXPENDITURE ESTIMATES
466 STATE GRANTS:
467 PROGRAM EXPENSES & SUPPLIES 41,935 41,935
468 BOOKS 107,216 107,216
469 AUDIO VISUAL SUPPLIES 55,000 55,000
470 TRAINING/CONF/FOOD/TRAVEL 5,000 5,000
471 CONTRACTUAL SERVICES 18,650 18,650
472 COMPUTUER HARDWARE 20,000 20,000
473 SUBTOTAL STATE GRANTS 247,801 247,801
474 FEDERAL GRANTS:
475 CURRENT YEAR BALANCE 133 16,336
476 TOTALS 247,934 264,137
Page 239
Page 16 of 16 FINAL READING
477 2009 - 2010 BUDGET ORDINANCES
478 COMMUNITY DEVELOPMENT BLOCK GRANT FUND
479 CASH RECEIPTS AND EXPENDITURES FOR 2009 - 2010
480 Info Only Revised
481 2009/10 2009/10
482 RECEIPT ESTIMATES BUDGET BUDGET
483 PRIOR YEAR BALANCE - 104,742
484 GENERAL FUND APPROPRIATION 11,000 11,000
485 FEDERAL GRANT 269,548 269,548
486 TOTALS 280,548 385,290
487 EXPENDITURE SUMMARY
488 COMMUNITY DEVELOPMENT DIVISION 56,109 56,109
489 CLOSING COST/DOWN PAYMENT PROGRAM 30,000 37,157
490 DOVER INTERFAITH MINISTRY 60,000
491 COMMUNITY REHAB ASSISTANCE 60,000 97,535
492 FAIR HOUSING COUNSELING 50
493 FIRST STATE RESOURCE CONSERVATION 35,000 35,000
494 GEM PROPERTIES 217 - 219 W REED ST 6,956 6,956
495 MURPHY SCHOOL 50,483 50,483
496 DOWNTOWN DOVER PARTNERSHIP 42,000 42,000
CURRENT YEAR BALANCE - -
497 TOTALS 280,548 385,290