Page 1
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on March 8, 2010 at 7:30 p.m. with
Council President Williams presiding. Council members present were Mr. Leary, Mrs. Russell,
Mr. Slavin, Mr. McGiffin, Mr. Hogan, Mr. Salters, and Mr. Ruane. Mr. McGlumphy was
absent.
Council staff members present were Police Captain Getek, Ms. Russell, Mrs. Mitchell,
Mrs. Townshend, Fire Chief Christiansen, Mr. DePrima, City Solicitor Rodriguez,
Mrs. McDowell, and Mayor Carey.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Williams declared the Open Forum in session and reminded those present that
Council is not in official session and cannot take formal action.
There was no one present wishing to speak during the Open Forum.
The invocation was given by Chaplain Dixon, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Council President Williams noted that, due to the absence of Ms. Brumble, item #2, Recognition
of Service - Dover Human Relations Commission - Katrina Brumble, should be deleted from the
agenda.
Mr. McGiffin moved for approval of the agenda as amended, seconded by Mr. Salters and
unanimously carried.
Mr. Slavin moved for approval of the consent agenda, seconded by Mr. Salters and carried
by a unanimous roll call vote (Mr. McGlumphy absent).
ADOPTION OF MINUTES - COUNCIL RETREAT OF JANUARY 29, 2010
The Minutes of the Council Retreat of January 29, 2010 were unanimously approved by
motion of Mr. Slavin, seconded by Mr. Salters and bore the written approval of
Mayor Carey.
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF FEBRUARY 22,
2010
The Minutes of the Regular Council Meeting of February 22, 2010 were unanimously
approved by motion of Mr. Slavin, seconded by Mr. Salters and bore the written approval
of Mayor Carey.
PUBLIC HEARING/FINAL READING - PROPOSED ZONING TEXT AMENDMENTS -
ORDINANCE #2009-28 AMENDING APPENDIX B - ZONING, ARTICLE 6 -
OFF-STREET PARKING, DRIVEWAYS AND LOADING FACILITIES, SECTION 5 -
SUPPLEMENTARY REGULATIONS FOR PARKING AND LOADING FACILITIES,
Page 2
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 2
SUBSECTION 5.5 - RACE WEEKEND PARKING
A public hearing was duly advertised for this time and place to consider approval of proposed
zoning text amendments to Article 6 - Off-Street Parking, Driveways and Loading Facilities,
Section 5 - Supplementary Regulations for Parking and Loading Facilities, Subsection 5.5 - Race
Weekend Parking, within the Zoning Code. The proposed amendments would establish
standards for motor vehicle and recreational vehicle parking for motor sports events. It would
codify the existing policy that ensures that such parking is compatible with emergency access
needs. The proposed amendment establishes a fee schedule for a permit to park more than five
(5) recreational vehicles during a motorsports racing event.
The proposed ordinance was reviewed by the Parks, Recreation, and Community Enhancement
Committee during their meeting of December 14, 2009 and approved by City Council during
their meeting of January 11, 2010, at which time the First Reading of the proposed amendments
was accomplished. Since the ordinances will amend the zoning text, a public hearing is required.
Mr. Salters moved that the Final Reading of the proposed zoning text amendment be
acknowledged by title only, seconded by Mr. McGiffin and unanimously carried. (The First
Reading of Ordinance No. 2009-28 was accomplished during the Council Meeting of
January 11, 2010).
Mrs. Townshend, Director of Planning and Community Development, briefly reviewed the
petition to amend the zoning text. She advised members that the Planning Commission
recommended adoption of the proposed amendment (Ordinance #2009-28) to the Zoning
Ordinance, including proposed Staff Amendment #1 (included in the First Reading), proposed
Staff Amendment #2, and Planning Commission Amendment #1. Their motion also included a
recommendation that City Council consider a lower permit fee for non-profit organizations.
Mrs. Townshend noted that an amendment was not prepared in this regard, since the motion was
not specific as to a fee, and requested Council=s consideration of a lower permit fee. She stated
that it was staff=s opinion that the fee schedule that was developed is reasonable and would not
cause any undue burden. She stated that the fees are reflective of the resources required by the
City for managing the operations, etc.
Council President Williams declared the hearing open.
There being no one present wishing to speak during the public hearing, Council President
Williams declared the hearing closed.
Mrs. Russell moved for approval of Planning Commission Amendment #1, seconded by
Mr. Salters and carried by a unanimous roll call vote (Mr. McGlumphy absent).
Mr. Hogan moved for approval of Staff Amendment #2, seconded by Mrs. Russell and
carried by a unanimous roll call vote (Mr. McGlumphy absent).
By motion of Mr. Salters, seconded by Mr. Hogan, Council, by a unanimous roll call vote
Page 3
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 3
(Mr. McGlumphy absent), adopted Ordinance #2009-28, as follows:
Page 4
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 4
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Appendix B - Zoning, Article 6 - Off-street Parking, Driveways and Loading Facilities,
Section 5 - Supplementary Regulations for Parking and Loading Facilities, Subsection 5.5 - Race
weekend parking, be deleted in its entirety and inserting, in lieu thereof, the following:
5.5 Parking for Motorsports Racing. During any ten (10)day period prior to or two (2) day
period following an auto racing event the following provisions shall apply:
5.51 Automobile parking
a. Property located within a residential zone may be used for
fee-based parking of motor vehicles. Fee-based parking shall not include
parking of commercial vehicles for use by commercial vendors and sales
representatives.
b. Unimproved surfaces may be used for automobile parking. Such
areas shall be reviewed by the Fire Marshal to ensure adequate emergency
access. No stormwater management areas or other preserved open space
shall be used for automobile parking.
c. Automobile parking shall in no case obstruct fire lanes, parking lot
drive aisles, emergency access, fire protection equipment, or cross access
easements between properties.
5.52 Recreational vehicle parking. Recreational vehicle parking shall be permitted
within all zones subject to the following requirements:
a. No more than three (3) recreational vehicles shall be parked on a
residential lot.
b. Property owners wishing to provide parking for more than five (5)
recreational vehicles shall apply for a permit from the licensing and
permitting division a minimum of 60 days prior to the race event. Fees for
the permit will be charged in accordance with Appendix F. Prior to
issuance of a permit, the property owner or his agent must submit a legible
diagram of the camping area to the licensing and permitting division. The
diagram shall show recreational vehicle parking location, emergency
access, drive aisles, entrance and exit, number of proposed recreational
vehicles to be parked, location of power lines, and location of restroom
facilities.
c. Recreational vehicles shall not be parked within 25 feet of power
lines as measured from the center of the utility pole. Vertical extensions
Page 5
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 5
from recreational vehicles shall not be closer than 25 feet to power lines as
measured from any point on the vertical extension.
d. Recreational vehicles shall not be parked closer than ten (10) feet
to other recreational vehicles, buildings or other structures, as measured
from the long side of the vehicle; nor closer than two (2) feet from other
recreational vehicles, buildings or other structures, as measured from the
front or rear of the vehicle. The required ten (10) feet shall exclude any
bump-outs or other protrusions from the side of the vehicle.
e. Recreational vehicle parking areas shall have drivable surfaces
engineered to hold the weight of recreational vehicles, fire equipment, and
other emergency response equipment in all types of weather.
f. Any changes to the layout of recreational vehicle parking areas
shall be required to be submitted to the licensing and permitting division
at least 30 days prior to the race event.
g. The Fire Marshal's Office may grant an exception to any provision
of section 5.52 if it can be demonstrated that equivalent means of public
safety and fire protection are being provided.
h. The Fire Marshal's Office shall develop policy guidance on the
implementation of this section.
BE IT FURTHER ORDAINED:
That Appendix F - Fees and Fines, Appendix B - Zoning, be amended by inserting a new Article
6 - Off-street Parking, Driveways and Loading Facilities, immediately following Appendix
B--Zoning, Article 5--Supplementary Regulations, as follows:
Fees and Fines
Description
(in dollars)
Appendix B--Zoning, Article 6--Off-street Parking, Driveways and Loading Facilities
Sec. 5 Supplementary Regulations for Parking and Loading Facilities
Subsec. 5.5 Parking for Motorsports Racing
Subsec. 5.52(b) 1-5 Recreational vehicles No fee
6-25 Recreational vehicles $25.00
26-50 Recreational vehicles $50.00
51-100 Recreational vehicles $100.00
>100 Recreational vehicles $150.00
ADOPTED: MARCH 8, 2010
Page 6
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 6
PUBLIC HEARING/FINAL READING - PROPOSED ZONING TEXT AMENDMENTS -
ORDINANCE #2009-30 CORRECTION TO APPENDIX B - ZONING, ARTICLE 6 -
OFF-
STREET PARKING, DRIVEWAYS AND LOADING FACILITIES
A public hearing was duly advertised for this time and place to consider approval of proposed
land and zoning text amendments that would clarify that uses in existing buildings within the C-2
(Central Commercial) zone would not be required to construct new parking spaces.
The proposed ordinance was reviewed by the Parks, Recreation, and Community Enhancement
Committee during their meeting of December 14, 2009 and approved by City Council during
their meeting of January 11, 2010, at which time the First Reading of the proposed amendment
was accomplished. Since the ordinance will amend the zoning text, a public hearing is required.
Mr. Salters moved that the Final Reading of the proposed zoning text amendment be
acknowledged by title only, seconded by Mr. Hogan and unanimously carried. (The First
Reading of Ordinance #2009-30 was accomplished during the Council Meeting of
January 11, 2010).
Mrs. Townshend, Director of Planning and Community Development, briefly reviewed the
petition to amend the zoning text. She advised members that the Planning Commission
recommended adoption of proposed Ordinance #2009-30.
Council President Williams declared the hearing open.
There being no one present wishing to speak during the public hearing, Council President
Williams declared the hearing closed.
By motion of Mr. Salters, seconded by Mr. Hogan, Council, by a unanimous roll call vote
(Mr. McGlumphy absent), adopted Ordinance #2009-30, as follows:
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Appendix B - Zoning, Article 6 - Off-Street Parking, Driveways and Loading Facilities,
Section 3 - Required Off-Street Parking Spaces, be amended to read as follows:
3.1 Schedule of requirements. Accessory off-street parking spaces, open or
enclosed, shall be provided for any lot as specified in article 4, zone bulk and
parking regulations or as specified below for each use in any zone, whichever is
greater, except for existing buildings within the C-2 Zoning District, where
Article 4, Section 4.14, zoning bulk and parking regulations governing the C-2
Zoning District shall prevail.
Page 7
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 7
ADOPTED: MARCH 8, 2010
PUBLIC HEARINGS - VIOLATION OF THE DANGEROUS BUILDING ORDINANCE -
NOTTINGHAM MEADOWS SUBDIVISION - 433 BEUVALE LANE, AND 312, 328, AND
329 GILLIBROOK LANE - OWNED BY STOVER HOMES, LLC
A public hearing was duly advertised for this time and place to consider a violation of the
Dangerous Building Ordinance at 433 Beuvale Lane, and 312, 328, and 329 Gillibrook Lane,
owned by Stover Homes, LLC.
Mr. Scott Koenig, Public Services Manager, stated that each property is under construction for a
single family home. The City of Dover has received an informal notice that the developer,
Stover Homes, LLC, is no longer operating; therefore, these structures are currently unsecured
and represent a potential danger to the health, safety, and general welfare of the community.
Several neighbors have complained that people are entering the unsecured structures. Staff
intends to board up the open garages since doors have not been installed. In addition, staff will
either board the entry doors to the homes or place locks on the doors to secure the structures. No
other work is intended to be done at this time.
Mr. Koenig assured members that these properties meet several definitions of a dangerous
building under Chapter 22, including but not limited to Section 22-381 - Definitions (12) -
Unoccupied Buildings. Since these properties are unsecured and there is no property owner to
notify, he explained that it would be appropriate to use the emergency provision under Section
288 of the Dover Code waiving the public notice requirements and the order to repair.
Staff recommended that City Council: 1) declare the property dangerous; 2) order the Building
Inspector to have the properties immediately secured; and 3) order the City Manager, with the
assistance of the City Solicitor, to cause the cost of securing these structures to be charged
against the land on which the building exists as a municipal lien or cause such cost to be added
to the tax duplicate as an assessment, or to be levied as a special tax, or to be recovered in a suit
of law against the owner. Mr. Koenig provided an estimate to secure the properties at a cost of
less than $600.
Responding to Mr. Salters, Mr. Koenig stated that staff will contact the bank, which has an
interest in the properties, regarding the City=s action. He was not aware of the process or length
of time involved in a foreclosure.
Council President Williams declared the public hearing open.
Mr. Alex Martin, 121 Derbyshire Avenue in Nottingham Meadows, advised members that the
residents have held meetings and, since the beginning of the year, they were provided
notification that Stover Homes is no longer in business, which is why the residents are in favor
of the City=s proposed action. He noted that the properties are not secured and that children are
Page 8
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 8
able to access them, which he explained could pose a danger. He also relayed concern with the
properties being accessed and vandalized.
Mr. Richard Scott, 216 Saxtondale Lane in Nottingham Meadows, urged members to approve the
requested action. He advised members that he has observed children accessing the properties
and that it is a dangerous situation. He also relayed concern with vandals accessing the
properties.
There being no one else wishing to speak, Council President Williams declared the public
hearing closed.
Mr. Ruane moved for approval of staff=s recommendation and that action, in regards to the
structures located at 433 Beuvale Lane, and 312, 328, and 329 Gillibrook Lane, owned by
Stover Homes, LLC, be taken, as follows: 1) declare the property dangerous; 2) order the
Building Inspector to have the properties immediately secured; and 3) order the City
Manager, with the assistance of the City Solicitor, to cause the cost of securing these
structures to be charged against the land on which the building exists as a municipal lien or
cause such cost to be added to the tax duplicate as an assessment, or to be levied as a special
tax, or to be recovered in a suit of law against the owner. The motion was seconded by
Mr. Leary and carried by a unanimous roll call vote (Mr. McGlumphy absent).
PLANNED NEIGHBORHOOD DESIGN - BAY VILLAGE GENERAL SKETCH PLAN -
LOCATED ON THE SOUTH SIDE OF WHITE OAK ROAD EAST OF STATE ROUTE
1
The Planning Office received a proposal to establish a Planned Neighborhood Development on
76.72+/- acres of land located on the south side of White Oak Road, east of SR 1, owned by Bay
Village, LLC.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, briefly
reviewed the application and advised members that the applicant is requesting to construct 462
residential units on approximately 76.72 acres known as Bay Village, south of White Oak Road
and east of State Route 1. She reminded members that Bay Village was the subject of another
Planned Neightborhood Development application in 2004, but this application included 224
acres and was proposing to utilize the Senior Citizen Housing Option.
Mrs. Townshend noted that in accordance with Article 3, Section 24.1.a of the Zoning
Ordinance, there is a three (3) step review and approval process for Planned Neighborhood
Design (PND), which is intended to "... encourage superior residential environments through a
unified planning process...". In the first step, the developer shall submit a general sketch plan to
City Council for their consideration in determining whether or not the proposed project is of such
a design and type that warrants further review by the Planning Commission. If Council
determines that further review is warranted, then the project shall proceed to the second step,
which is a more detailed Conditional Use Site Plan review and public hearing before the
Planning Commission.
Page 9
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 9
Mr. Ruane relayed concern with making a determination, explaining that the only information
provided was the general sketch plan, which appears to depict a full build-out plan/concept and
does not appear to allow for other requirements, such as well-head protection areas, etc. He
noted that there is no criteria provided in the Code to give guidance to members of Council with
regards to determining superior residential environments and design.
Responding to Mr. Ruane, Mrs. Townshend stated that the Code encourages a mix of uses of
housing style and type, which the proposed plan provides. She explained that at this time,
certain detailed requirements are not provided; however, she assured members that the open
space plan and the active recreation plan would require review by the Parks, Recreation, and
Community Enhancement Committee for their recommendation to City Council. In response to
the concerns regarding the PLUS comments, Mrs. Townshend assured members that the
applicant will be required to respond to each of the comments prior to submitting an application
to the Planning Commission.
Mr. Hogan also relayed concern with the general sketch plan, explaining that it depicts a very
crowded and congested neighborhood. He questioned the location of the wetlands which must
be protected. Responding, Mrs. Townshend stated that in any case where there are wetlands on a
State map, the City would require a wetlands delineation prior to any development application.
In response to Mr. Leary, Mrs. Townshend explained that if Council refers the PND to the
Planning Commission, the first step would be for the applicant to submit a conditional use
application to the Planning Commission, at which time the wetlands delineation, their concept
for active recreation, landscaping, building architecture, etc. would be reviewed, so that by the
time the matter is presented to the Planning Commission, much more information would be
provided. The Planning Commission would hold a public hearing, and afterwards a decision
would be made on the conditional use portion of the application. She stated that the plan design
presented will probably be changed substantially prior to submission to the Planning
Commission and that it could and probably would be changed again by the Planning
Commission.
Mr. McGiffin moved to forward the Planned Neighborhood Design Application for Bay Village,
General Sketch Plan, to the Planning Commission, seconded by Mr. Leary.
Mr. Ruane moved that the applicant be required to have responses to the PLUS comments
contained in the package provided to Council when submitting documents to the City Planning
Department. The motion was seconded by Mr. Slavin.
Responding to Mr. Salters, Mrs. Townshend reiterated that the applicant will be required to
respond to each of the PLUS comments prior to submitting an application to the Planning
Commission.
Mr. Ruane explained his understanding was that the response to the PLUS comments are not
required until the second stage of the design review. His motion suggests that the response be
required when the application is presented to staff, during the initial review.
Mr. McGiffin felt that the City had a process in place and that the process should not be changed
Page 10
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 10
on an ad-hoc basis.
The motion that the applicant be required to have responses to the PLUS comments contained in
the package provided to Council when submitting documents to the City Planning Department
failed by a roll call vote of six (6) no, two (2) yes (Mr. Slavin and Mr. Ruane), and one (1) absent
(Mr. McGlumphy).
The motion to forward the Planned Neighborhood Design Application for Bay Village,
General Sketch Plan, to the Planning Commission was carried by a roll call vote of six (6)
yes, two (no) (Mr. Hogan and Mr. Ruane), and one (1) absent (Mr. McGlumphy).
SPECIAL PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE REPORT - FEBRUARY 22, 2010
A Special Parks, Recreation, and Community Enhancement Committee meeting was held on
February 22, 2010 with Chairwoman Russell presiding.
Presentation - by Greater Dover Committee - Kent Sports Complex
Ms. Linda Parkowski, Director, Delaware Economic Development Office, Tourism Division,
explained that her office had received a number of Requests for Proposals to hold sporting events
in Delaware and that these requests involved a significant amount of money. She subsequently
met with Cindy Small, Executive Director, Kent County & Greater Dover Delaware Convention
and Visitors Bureau, to discuss the possibility of locating such a facility in Delaware. Ms.
Parkowski reviewed a presentation regarding a proposal for the construction of a sports complex
in Kent County. She indicated that the complex could potentially include 15 multipurpose fields
that could host "long-field" sports such as soccer, lacrosse, and field hockey, as well as other
tournaments, and would also include a lighted turf stadium which could seat 1,000 people. She
estimated that such a facility could result in an economic impact of as much as $30 million in
one (1) year for Kent County. Ms. Parkowski noted that there is a need for more athletic fields
in Kent County and that such a facility could alleviate problems stemming from the overuse of
existing fields in the area. She anticipated that the facility would be organized through a
public/private partnership and identified various potential stakeholders in the project. She
reviewed a map of the proposed complex, which she explained would occupy 100 acres. She
noted that Kent County donated a 600-acre site and offered effluent water from a nearby sewage
treatment plant to irrigate the sports complex fields.
Mr. Gregg Moore, President of the Greater Dover Committee (GDC), explained that his
organization has adopted this project, believing that it could be a great enhancement to the
community and a very strong economic development opportunity for Kent County and its
municipalities. He explained that a consultant will be commissioned to perform a feasibility
study to determine whether the proposed location, type of facility, number of fields, and
connection with Route 1 are viable options. The study will also provide information regarding
how other competing facilities operate, as well as who the owner and operator of the complex
should be.
Page 11
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 11
He reviewed a map of the project=s proposed location, stating that the complex was originally
considered for a location in central Dover; however, there were no properties large enough to
accommodate 15-20 fields. However, the County had 600 acres of property which they were
willing to donate. Mr. Moore stated the Delaware Department of Transportation (DelDOT) is
planning to eliminate crossings on Route 1 to expedite traffic south and has designed an
interchange directly at the proposed site, which is scheduled for construction in 2013. He felt
that the high speed highway connection to Dover and the beaches is a key factor in the plan,
stating that this would be a great asset to the project in terms of both accessibility and visibility,
and projected a very positive economic impact for Dover, as families attending sporting events
would be drawn to Dover lodging and attractions.
In response to Mr. Anthony DePrima, City Manager, Mr. Moore identified the area in discussion
as being positioned off Route 1 near the bridge that crosses the Murderkill River, southeast of
Frederica, and near the sewage treatment plant. He explained that Kent County had purchased
the property surrounding the plant to prevent housing development in that area.
Responding to Mr. Hogan, Ms. Parkowski explained that one option that is being considered as a
funding source to help sustain the facility is a "room booking engine" which is an approach that
is sometimes used by similar facilities. Under this system, when hotel rooms are booked for a
tournament event, a rebate goes directly to the facility. She explained that this results in a user
fee that is charged only to those who use the facility, as opposed to a general, overall tax.
In response to Mr. Hogan, Mr. Moore stated that most Dover hotels are within 15-16 miles of the
proposed site, which is similar to the situation in Downingtown, Pennsylvania, where a sports
facility is currently operating successfully. He noted that this complex would be Dover=s closest
competitor. He stated that Harrington hotels were approximately ten (10) miles from the site, but
believed that the municipality of Dover would be the biggest beneficiary from users due to the
availability of hotels and restaurants in close proximity to shopping in the City.
Responding to Mr. Hogan, Ms. Parkowski stated that the proposed feasability study should
provide recommendations to help identify an owner/operator for the facility, and that
possibilities include a partnership arrangement or a non-profit group that hires a professional
sports operator or management company.
In response to Mr. Hogan, Mr. Moore indicated that baseball is not being proposed at the
complex at this time because there are competing facilities presently both in northern Delaware
and in southern Delaware. However, he stated that various types of offerings to be available at
the site will also be considered in the feasibility study.
Mr. DePrima provided a brief history of his involvement with the project, noting that it was first
proposed for the City=s Garrison Tract. He stated this was ruled out as an option for various
reasons, including zoning issues and the need to proceed with energy goals established by the
City=s 2030 committee. He indicated that there was an attempt at that time to partner with
Delaware State University for the project, but this was unsuccessful.
Page 12
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 12
In response to Mr. DePrima, Mr. Zachery Carter, Director of Parks and Recreation, confirmed
that fields at Schutte Park are overused due to both league demands and utilization of the site for
practice and "pick-up" games.
Responding to Mr. Ruane, Ms. Parkowski stated that it is believed that, in order to be successful,
the facility must operate 12-15 tournaments per year, but presumably could be used by the
community the rest of the time. She emphasized that the feasibility study should provide
information on which uses could be both economic generators and serve the community.
In response to Mr. Ruane, Mr. Moore stated that the Central Delaware Soccer Association
(CDSA) has been involved in the discussion regarding the facility and is interested in
participating.
Responding to Mrs. Russell, Mr. Moore stated that he hopes the facility would operate at no cost
to the taxpayers. However; he noted that the GDC plans to approach a number of different
sources for money, including the State, Kent County, the City of Dover, other Kent County
municipalities, and any outside entities who want to help build, fund, and operate the facility.
Mr. Ruane noted that City of Dover taxpayer money is already at stake in that City residents
contribute $2.5 million per year in County taxes and have, therefore, contributed to funds used to
purchase the land.
In response to Mrs. Russell, Mr. Carter stated he felt the facility would not impact use of Schutte
Park, as local teams will still need a place to play, and the proposed complex would host large
tournaments with entry fees of approximately $500-$700 per team.
Responding to Mrs. Russell, Mr. Moore stated that he is currently hoping to raise funds for the
feasibility study, which is estimated to cost from $50,000-$100,000. He noted that he had
recently received proposals from five (5) firms, one of which is the Ripken Baseball Group of
Maryland, which has had success operating a similar facility in Baltimore.
In response to Mrs. Russell, Mr. Moore stated that the feasibility study would provide
projections for the number of jobs that could be created in both construction and operation of the
facility; however, he felt that the greatest potential benefit to Dover will be the thousands of
people who will be drawn to the City, resulting in increased jobs in local hotels, restaurants, and
stores.
Responding to Mr. Lewis, Mr. Moore projected that the feasibility study could take
approximately three (3) months and that he anticipates the planning stage to continue for 12-18
months.
Mr. Moore requested the City=s support for the project.
No further action was taken by the committee.
Page 13
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 13
During the Council Meeting, Mr. Moore and Mrs. Parkowski provided a Presentation - Kent
County Sport Facility: Making a Dream a Reality (Exhibit #1).
Responding to Mr. Salters, Mr. Moore stated that neither basketball nor baseball were mentioned
in the presentation. He advised members that one of the reason for pursuing the feasibility study
is to make sure that the decisions being made are right in this regard. He explained that it was
felt that baseball facilities are offered in communities throughout Delaware and there is not quite
as much traveling involved in baseball, as with some of the other sports, reminding members that
it is felt that this project will bring people in from other areas for the traveling sports, such as
soccer and lacrosse. He noted that basketball, unless held inside, would not bring people in from
other areas since tournaments are typically held inside. He stated that it is felt that there would
not be available the necessary revenue required for basketball.
In response to Mr. Ruane, Mr. Moore stated that there has been communication with the Central
Delaware Soccer Association (CDSA); however, there have been no further discussions since
their last committee meeting. Mrs. Parkowski advised members that the CDSA indicated their
interest in participation and utilizing the facility and that they are very supportive of the efforts.
Once the results of the feasibility study are obtained, she stated that further meetings with the
CDSA will be held.
Mr. Moore assured members that the Greater Dover Committee is considering all the comments
being made and that updates would be provided as they move forward. He requested that the
City of Dover become a partner and leader with the Greater Dover Committee and that the City
include a financial contribution in their budget for the upcoming year.
Statistics Regarding Jobs and Businesses Gained and Lost in the City of Dover since July
2009
Mr. William Neaton, Economic Development Director, reviewed a report listing employment
statistics on the 12 largest employers in the Dover area and explained that his office has
established relationships with the management and human resources departments of these
companies in order to track job growth or decline. He stated that he plans to update the
Committee and Council with this information on a semi-annual basis.
Mr. Hogan noted that Dover Downs is planning to hire approximately 200 people and that
Wal-Mart is planning to leave Dover, which will result in job loss.
In response to Mr. Ruane, Mr. Neaton stated that December statistics indicate a decline in the
unemployment rate in Dover.
Mr. Ruane noted that the Committee would benefit from information regarding specific
employment sectors such as construction, manufacturing, and finance and noted that some of the
smaller businesses are being hurt the most.
Page 14
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 14
Mr. DePrima noted that the report is "organic" and will improve over time. He noted that the
report is a good starting point and has value, as it allows staff to monitor employment trends. He
felt that some decisions should be made on the boundaries to be included, noting that Comcast is
not within City of Dover limits and that Wal-Mart will move outside City limits but will not
result in job loss for residents of Dover. In addition, he suggested that statistics from Dover Air
Force Base (civilian, uniformed, and active duty personnel) be added to the report.
Mr. Neaton stated that information on the Air Force Base is readily available and will be
provided to members.
Benchmarks Established for the Economic Development Office
Mr. William Neaton, Economic Development Director, reviewed a report on benchmarks
established by the Economic Development Office. He explained that the Downtown Dover
Partnership (DDP) recently partnered with an informal association of Bar, Restaurant, and
Tavern owners in the downtown area, who will bring in three (3) or four (4) Friday night events
to the area. He provided a verbal update to the report, stating that a total of three (3) new
businesses have recently relocated to the downtown target area, resulting in the filling of three
(3) vacant commercial tenant spaces.
Mr. Neaton provided members an updated version of the Downtown Dover Partnership Vacant
Building Inventory/Update (attachment to committee minutes) for review. He noted that the
format was revised to include property profiles, asking price, and contact information so that this
information is readily available to interested parties.
Mr. Ruane suggested that the achievements of the Downtown Dover Partnership be reflected in
the report, including the good work done in assembling land parcels and assuming responsibility
for
managing DDP-owned parcels.
Statistics Regarding the Percentage of Pitts Center Users Who Are Non-Dover Residents
Mr. Zachery Carter, Director of Parks and Recreation, reviewed the John W. Pitts Recreation
Center Report of Participant Use, noting that 39% of all users are City residents, 53% non-City,
and 8% are under age 12 or visitors. He indicated that non-revenue generating users consist of
41% City residents, 50% non-City, and 9% under 12 or visitors. He added that statistics for
league play reflect that 20% of participants are City residents and 80% are from outside the City,
and 33% of league sponsors are located in the City compared to 67% outside the City.
In response to Mr. Hogan, Mr. Carter stated that access to the Open Gym varies by season and
that there is sometimes no access available on Saturdays due to youth basketball and field
hockey leagues.
Mr. Hogan expressed frustration that the City is providing a "tremendous amount" of recreational
opportunities for those residing outside of City limits. He felt that at some point, fees for
non-City residents should be considered.
Mr. Ruane suggested that the report be provided to the County and that they be encouraged to
proceed with building an additional indoor recreation facility, as they had stated their intention to
Page 15
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 15
partner with the City in meeting this need for area residents.
In response to Mr. Ruane, Mr. DePrima indicated that he intends to share this information with
Mr. Michael Petit de Mange, Kent County Administrator.
UPDATES
Puncheon Run Watershed Action Team Report
Mr. Scott Koenig, Public Services Manager, stated that he had no further information to report at
the current time.
Planning and Funding for New Library
Mr. Zachery Carter, Parks and Recreation Director, stated that the Library Fundraising
Campaign is active and $100,000 has been raised to date. He noted that approval to hire an
architectural firm to prepare construction documents for the new library will be considered by
City Council on February 22, 2010.
Comprehensive Plan for Implementation Status Report
A written report was submitted by Mrs. Ann Marie Townshend, Director of Planning and
Community Development.
Skate Park Committee
Mr. Chris Asay, member of the Skate Park Committee, stated that after receiving permission
from the Committee to proceed with a temporary skate park, Skate Park Committee members
evaluated the site of the former water treatment plant south of Legislative Hall, determined it
would be adequate, and met with neighborhood residents who granted conditional approval
pending more details. However, he explained that after meeting with Mr. DePrima and Mr.
Carter at the site, it was determined that the location had drawbacks, including limited visibility
for monitoring purposes, and would also require fencing, which would cost over $10,000. It was
the conclusion of the Skate Park Committee that a temporary skate park was not a viable option
and that the City is continuing to leave skateboarders on their own to find non-sanctioned
surfaces for practicing their sport.
Mr. Asay stated that the Skate Park Committee requests that the City: 1) incorporate a modest
allocation in the Parks Department budget for in-house construction of "skate spots", which are
small concrete areas within larger parks in the city that could be built immediately; and 2)
finalize a site to be designated for a larger, permanent regional skate park. He stated that it is the
Skate Park Committee=s hope that this permanent project be incorporated in the master plan for
Schutte Park. He noted that taking these steps would demonstrate the City=s commitment to
providing local skateboarders with legitimate places to skate and allow the group to begin
fundraising efforts. He stated that Kent County has expressed an interest in participating and
requested that the Committee support these two (2) ideas.
Page 16
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 16
In response to Mrs. Horsey, Mr. Carter stated that Dover Park, Silver Lake, and a small area at
Schutte Park are being considered for the addition of skate spots, which would provide locations
in central Dover, as well as on the east and west sides.
Mrs. Horsey expressed her support for these recommendations in view of the problems the City
is currently experiencing due to unmonitored skateboarding activities.
Mr. DePrima stated that the Skate Park project, which includes identifying three locations for
skate spots and preparing a proposed concept, budget, and design for a major park, is one of Mr.
Carter=s evaluation goals. He stated the Skate Park Committee could assist in this process by
producing a document that would outline its recommendations for Mr. Carter=s consideration.
In response to Mr. Ruane=s request that funds for skate spots be included in the budget for the
next fiscal year, Mr. DePrima stated that he and Mr. Carter were discussing both skate parks and
spray parks but did not feel both could be funded simultaneously. He stated that he would like to
get a recommendation from the Committee regarding their priorities.
Youth Advisory Committee
Mrs. Russell stated that the previous Youth Advisory Committee meeting was canceled due to
inclement weather, but the group remains active.
Mr. Leary moved for acceptance of the Special Parks, Recreation, and Community
Enhancement Committee Report, seconded by Mr. McGiffin and unanimously carried.
UTILITY COMMITTEE REPORT - FEBRUARY 22, 2010
The Utility Committee met on February 22, 2010 with Chairman Ruane presiding.
Water/Wastewater Service Handbook and Related Proposed Ordinance #2010-07
Mr. Ron Lunt, Public Utilities Director, informed members that the Public Utilities Department
identified a need for an up-to-date document that outlined the standards and requirements of the
water and wastewater utilities and associated infrastructure. He further mentioned that,
historically, the various codes, rules, regulations, standards, specifications, requirements, and
practices were not located or referenced within a single document. To rectify this situation, Staff
developed a new document complete with several appendices and related ordinance
amendments. Mr. Lunt stated that the primary goal of this handbook is to have all of the
information in one document, benefitting property owners, customers, developers, consultants,
contractors, and City of Dover staff. Mr. Lunt thanked Ms. Sharon Duca, Water/Wastewater
Manager, and Mr. Jeremy Johnson, Electrical Engineer I, for their hard work on this project.
Ms. Duca reviewed the Water/Wastewater Service Handbook and Related Proposed
Ordinance #2010-07.
Mr. Ruane commended the Public Utilities staff for their efforts on the handbook.
Page 17
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 17
Mr. Hogan suggested that the authors of the handbook should be listed on the document and that
a copy of the handbook should be kept at the Library.
Responding to Mr. Hogan, Ms. Duca stated that she was unsure if a double trap would be needed
if an irrigation system was installed at a location where only one trap exists.
In response to Mr. McGiffin, Ms. Duca stated that the handbook would be used for answers
regarding installation and would be adopted along with the Ordinance.
Major Kosior requested that the changes and updates be incorporated into a separate, condensed
document to be used as a quick reference guide.
Responding to Mr. Ruane, Ms. Duca concurred that separate, subject-specific handouts will
continue to be provided at the entrance of the Public Utilities Department.
In response to Mr. Ruane, Ms. Duca stated that, although new construction requires two (2)
cleanouts, only the one outside of the right-of-way or easement line is the jurisdiction of Public
Utilities; the cleanout located near the house is the responsibility of the Planning and Inspections
Department. Ms. Duca further mentioned that the handbook is not meant for code enforcement
on existing buildings but for use on new projects.
Responding to Mr. Ruane, Ms. Duca stated that the section stating that no trees may be planted
within ten feet (10=) of water and wastewater utility refers to the main line, not the lateral.
In response to Mr. Ruane, Ms. Duca stated that, because the City is a contract user of Kent
County, the City must adhere to the sewer section of the County code. Mr. Ruane suggested that
a pamphlet be created to explain the codes related to sewer. In addition, he suggested that the
City offer caps free of charge to residents to aid in the elimination of illegal discharges to the
sanitary sewer system, similar to the City=s smoke detector giveaway, and requested that Staff
research the cost of caps.
Mr. Anthony DePrima, City Manager, thanked those involved in putting this document together.
The committee recommended approval of the Water/Wastewater Service Handbook and Related
Proposed Ordinance #2010-07.
By consent agenda, Mr. Slavin moved for approval of the committee=s recommendation for
approval of the Water/Wastewater Service Handbook (Exhibit #2) and related proposed
Ordinance #2010-07. The motion was seconded by Mr. Salters and carried by a unanimous
roll call vote (Mr. McGlumphy absent). (The First Reading of the ordinance will take place
during the latter part of the meeting).
Review of Utility Related CIP=s (Electric and Water/Wastewater) (December 2009)
Members were provided the Capital Investment Plan Project Tracking Report (as of
Page 18
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 18
December 31, 2009) and Major CIP Project Reports for the General Fund, Community
Transportation and General Fund Street Funds, Water/Wastewater Improvement and Extension
Fund, and Electric Improvement and Extension Fund.
Mr. Anthony DePrima, City Manager, advised members that the CIP Report has been returned to
the previous format, as it is more comprehensive. He stated that all of the electric projects have
been started and that great progress is being made on the water/wastewater projects.
Responding to Mr. Hogan, Mr. DePrima stated that the City received a substantial Federal grant
for the Lincoln Park Center project, which involves the extension of Clarence Street from North
Street to Forest Street and includes the redevelopment of the industrial land on those streets.
In response to Mr. Ruane, Mr. DePrima stated that the water tower project might be delayed due
to a decrease in growth projections; however, three (3) potential sites for the tower are being
considered.
The committee recommended acceptance of the report.
By consent agenda, Mr. Slavin moved for approval of the committee=s recommendation,
seconded by Mr. Salters and carried by a unanimous roll call vote (Mr. McGlumphy
absent).
Update - Green Energy Funding and Programming
Mr. Anthony DePrima, City Manager, advised members that the City received notification from
the Federal Government that the $180K for the Energy Efficiency Community Block Grant can
now be expended. He further advised members that the contract for the Solar Project at the
power plant has started, the specification process for the LED Project is underway, and the
wastewater motor replacement is ready for the bidding process.
Responding to Mr. Hogan, Mr. DePrima stated that the LED replacement lights will continue to
work on a sensor as they currently do and advised members to report any flickering lights.
In response to Mr. Ruane, Mr. DePrima stated that he has not received any word regarding the
State distribution of $9M of Federal funds allocated for green energy projects.
Responding to Mr. Ruane, Mr. DePrima confirmed that the Department of Natural Resources
and Environmental Control (DNREC) is an electric customer of the City of Dover that received a
$30K Green Energy Grant award.
In response to Mr. Ruane, Mr. Ron Lunt, Public Utilities Director, stated that a recipient can be
awarded more than one (1) grant if applying for different technologies, such as geothermal and
solar. He further advised that there is a seven (7) month delay in grant awards, as there are more
applications than available funds.
Page 19
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 19
The committee recommended acceptance of the Update on Green Energy Funding and
Programming Report.
By consent agenda, Mr. Slavin moved for approval of the committee=s recommendation,
seconded by Mr. Salters and carried by a unanimous roll call vote (Mr. McGlumphy
absent).
PACE/NAES Monthly Report (December)
Members were provided the PACE/NAES Monthly Report for December. The report was
provided to allow members the opportunity to monitor what is being sold in electric and the
revenues received, which will give members a better understanding of any fluctuations and make
improvements if deemed necessary. Although it was not staff=s intention to make a presentation
of the report, they welcomed any questions.
Mr. Anthony DePrima, City Manager, advised members that the budget was reset as part of a
mid-
year review process. He further mentioned that December was the coldest month on record and
that there were no run time or accidents. Mr. DePrima noted that CO2 credits were added in the
amount of $6K. The Environmental Protection Agency (EPA) has requested that the plant be
turned on for testing, and when this occurs there will be costs involved.
The committee recommended acceptance of the PACE/NAES Monthly Report for December.
By consent agenda, Mr. Slavin moved for approval of the committee=s recommendation,
seconded by Mr. Salters and carried by a unanimous roll call vote (Mr. McGlumphy
absent).
By consent agenda, Mr. Slavin moved for acceptance of the Utility Committee Report,
seconded by Mr. Salters and carried by a unanimous roll call vote (Mr. McGlumphy
absent).
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
FEBRUARY 22, 2010
The Legislative, Finance, and Administration Committee met on February 22, 2010 with
Councilman Salters presiding in the absence of Chairman McGlumphy.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of the Hiring
Freeze for Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review
and approval of the Legislative, Finance, and Administration Committee and City Council. It
was suggested that there be a "standing" agenda item to consider the filling of critical positions
and, if there are no positions to consider, the item could be removed.
Page 20
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 20
Temporary/Part-Time Account Clerk III
Mrs. Mitchell, Controller/Treasurer, explained that due to the increased workload in the payroll
office, it is necessary to hire a temporary/part-time Account Clerk III and briefly reviewed the
hiring justification provided to members. She advised members that the position would be filled
through Accountemps Agency for 22 weeks, beginning March 1, 2010 through July 31, 2010.
Responding to Mr. Leary, Mrs. Mitchell indicated that an extra position has been budgeted for to
help with the workload in next fiscal year=s budget and that staff is also reviewing the possibility
of outsourcing as an alternative.
The committee recommended that staff be granted permission to recruit for the position of a
temporary/part-time Account Clerk III, as requested by staff.
By consent agenda, Mr. Slavin moved for approval of the committee=s recommendation,
seconded by Mr. Salters and carried by a unanimous roll call vote (Mr. McGlumphy
absent).
Proposed Amendment to the United Way Land Lease
Mr. DePrima advised members that in 1985, the City of Dover leased excess land located on
United Way Drive to the United Way for one ($1) dollar. The purpose was to give the United
Way an opportunity to build an office building on the property. The terms of the lease allowed
the United Way to lease the property as long as it was used for its purposes. One condition of
the lease was that the United Way could not sublease the property without approval from the
City of Dover. The United Way constructed a building on the lot and has occupied it in
accordance with the lease since 1986.
Mr. DePrima stated that the United Way of Delaware now wishes to relocate its Kent County
Office to the new Community Service building, which is a more central location that will put the
organization in closer contact with the many nonprofit groups it serves. The Community
Services building is operated by the Greater Dover Committee at 101 W. Loockerman Street,
Suite 2B. The United Way wants to make its existing facility available to its nonprofit partners
that may need the space to provide direct services to the people of Kent County. These services
might include job training programs, financial assistance programs, youth services, and other
related initiatives that would be especially meaningful in the present economy.
Under the current lease, Mr. DePrima explained that the United Way would have to seek City
Council approval each time it wishes to sublease its property to one of its partners. As an
alternative, a lease amendment has been prepared to give the United Way the flexibility to
sublease its properties to partner organizations. He stated that it is staff=s opinion that the City
has no need for the land, and the lease amendment preserves the spirit of the original lease.
Members were provided with the original land lease, as well as the proposed amendment.
Staff recommended approval of the proposed amendment that will allow the United Way to
sublease property to partnership organizations.
Page 21
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 21
Responding to Dr. Jones, Ms. Michelle A. Taylor (President and Chief Executive Officer for
United Way of Delaware) indicated that there is already one (1) potential partner who works
with the Unemployment Office and State Service Centers and provides some workforce
development services, such as conducting training, rebuilding competency skills, etc.
In response to Mr. Leary, Mr. DePrima stated that, should the committee recommend its
approval, he would request the City Solicitor to review the proposed amendment prior to the
committee=s recommendation being considered by City Council on March 8, 2010.
The committee recommended approval of the proposed lease amendment that will allow the
United Way to sublease property to partnership organizations, contingent upon the City
Solicitor=s review. (City Clerk=s Office Note: The lease amendments have been reviewed and
approved by City Solicitor Rodriguez).
By consent agenda, Mr. Slavin moved for approval of the proposed lease amendment
(Exhibit #3), as recommended by the committee. The motion was seconded by Mr. Salters
and carried by a unanimous roll call vote (Mr. McGlumphy absent).
Final Report - Revenue/Cost Saving Ideas Submitted for Consideration
During their meeting of May 19, 2009, Council reviewed the budget for Fiscal Year 2009/2010
which included a budget shortfall in the amount of $986,781 (across all three (3) funds). In light
of the shortfall, Mr. Kenneth Clendaniel, along with the IUE, provided a list of suggestions to
save money and increase revenue throughout the City of Dover. Mr. McGlumphy had noted that
the 30 suggestions would be considered by members 10 at a time. During their meeting of July
13, 2009, members began their review of a list (items #1-#10) of revenue/cost saving ideas
developed by employees (items #11-#20 were reviewed during their meeting of August 10, 2009;
items #21-#30 were reviewed during their meeting of September 14, 2009; and items #31-#48
were reviewed during their meeting of October 12, 2009).
During the committee meeting of October 12, 2009, staff was directed to provide the Committee
with a more detailed analysis on all suggestions for further discussion. It was estimated that it
would take at least a month for staff to research and analyze findings before reporting back to the
Committee.
Mr. DePrima, City Manager, submitted a report that provided the recommendation/status as well
as the estimated revenue decrease/increase regarding the Revenue/Cost Saving Ideas Submitted
by City Employees.
The committee recommended acceptance of the reports submitted, List of Ideas for the City to
Save Money or Bring in Revenue and City Wide Ideas to Save Money.
Mr. Leary reiterated appreciation for the ideas that were brought forward by Mr. Clendaniel and
other employees throughout the City.
Page 22
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 22
By consent agenda, Mr. Slavin moved for approval of the committee=s recommendation for
acceptance of the reports submitted, List of Ideas for the City to Save Money or Bring in
Revenue and City Wide Ideas to Save Money. The motion was seconded by Mr. Salters
and carried by a unanimous roll call vote (Mr. McGlumphy absent).
Proposed Ordinance #2010-06 - Amending Chapter 102 - Taxation, Article VI -
Exemptions; Board of Assessment Appeals, Section 102-183 - Tax Exemptions for Senior
Citizens, Subsection (b) - Qualifications, Subsection (3) - Exclusions from Income
Members were provided Proposed Ordinance #2010-06 that would place a cap on the excluded
amount allowed for Civil Service Pension. Ms. Russell, City Assessor, advised members that
when an ad hoc committee was formed in October 2007 to discuss property tax reductions for
senior citizens, a major topic was the addition of an exclusion for Federal Civil Service
Retirement. It was reported that former federal retirees participate in this retirement plan as an
alternative to Social Security. The Federal Civil Service Retirement was approved as an
exclusion and became effective for the July 2008 Billing. She stated that during the past two (2)
years, the Assessor=s Office has noticed that there are approximately 16 senior citizens who
benefit from the new exclusion. The purpose of this ordinance amendment is to implement an
income cap for federal retirees as is currently in effect for Social Security retirees. Mrs. Russell
indicated that if the amendment is adopted, approximately five (5) senior citizens would not
qualify for the Senior Reduction in taxes because of the significant amount of income that is
received from the Civil Service Pension.
Staff recommended approval of Proposed Ordinance #2010-06, amending Chapter 102 -
Taxation, Article VI - Exemptions; Board of Assessment Appeals, Section 102-183 - Tax
Exemptions for Senior Citizens, Subsection (b) - Qualifications, Subsection (3) - Exclusions
from Income.
The committee recommended adoption of Proposed Ordinance #2010-06.
By consent agenda, Mr. Slavin moved for approval of the committee=s recommendation,
seconded by Mr. Salters and carried by a unanimous roll call vote (Mr. McGlumphy
absent). (The First Reading of the ordinance will take place during the latter part of the
meeting).
By consent agenda, Mr. Slavin moved for acceptance of the Legislative, Finance, and
Administration Committee Report, seconded by Mr. Salters and carried by a unanimous
roll call vote ( Mr. McGlumphy absent).
MONTHLY REPORTS - JANUARY 2010
By motion of Mr. Slavin, seconded by Mr. Salters, the following monthly reports were
accepted by consent agenda:
Budget Report
Page 23
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 23
Chief of Police Report
City Assessor Report
City Manager's Report
City Planner=s Report
LETTER IN OPPOSITION TO HOUSE BILL #194 - ADDITION OF NEW GAMBLING
VENUES IN DELAWARE
During their Regular Meeting of February 22, 2010, members considered a request for the
submission of a letter in opposition to the addition of new gambling venues in Delaware (House
Bill #194). After much discussion, members requested that the letter be redrafted in a format
that is appropriate for the City of Dover and that House Bill #194 and other appropriate materials
be provided and resubmitted at the next City Council Meeting for further consideration.
Council President Williams noted that members have been provided with a revised letter as well
as House Bill #194 and its amendments.
Mr. McGiffin moved for approval of the letter as drafted, seconded by Mr. Hogan.
Mr. Hogan stated his concurrence with the concept as included in the letter, indicating his feeling
that three (3) casinos is adequate for Delaware. His only concern with the draft letter is with the
reference of a "catastrophic collapse" as mentioned in line 25. He suggested that line 25 of the
letter be amended to replace "lead to catastrophic collapse of" to "could create serious financial
damage to".
Mr. Ruane suggested that there are other exaggerations in the letter; however, he relayed his
concurrence with the general concept.
Mr. Hogan moved that line 25 of the letter be amended to replace "lead to catastrophic
collapse of" to "could create serious financial damage to". The motion was seconded by
Mr. McGiffin and unanimously carried.
The motion for approval of the letter as amended (Exhibit #4) was unanimously carried.
SETTING OF PROPERTY ASSESSMENT APPEALS
Ms. Russell, City Assessor, requested that the 2010 Property Assessment Appeals be scheduled
for May 3, 2010 through May 7, 2010, and May 24, 2010 through June 11, 2010 between the
hours of 9:00 a.m. and 4:00 p.m.
Mr. Slavin moved to set the property assessment appeals as recommended by staff. The
motion was seconded by Mr. Hogan and unanimously carried.
ANNUAL REPORTS - PLANNING AND COMMUNITY DEVELOPMENT AND
POLICE DEPARTMENT
By consent agenda, Mr. Slavin moved for acceptance of the Annual Reports of the Planning
and Community Development and the Police Departments (as on file in the Office of the
City Clerk), seconded by Mr. Salters and carried by a unanimous roll call vote (Mr.
McGlumphy absent).
REZONING REQUEST/FIRST READING - NOTTINGHAM MEADOWS - SOUTH
Page 24
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 24
SIDE OF HAZLETTEVILLE ROAD, WEST OF WYOMING MILL ROAD
A request was received to rezone properties located on the south side of Hazlettville Road, west
of Wyoming Mill Road, consisting of 88.10+/- acres, owned by multiple individual property
owners. The property is currently zoned RM-1 (Medium Density Residence) and the requested
zoning is R-8 (One Family Residence).
Prior to amending the zoning ordinances and zoning map of the City of Dover, a public hearing
is required.
By motion of Mr. Ruane, seconded by Mr. Slavin, Council unanimously referred the
request to the Planning Commission on April 19, 2010 and set a public hearing for May 24,
2010 at 7:30 p.m.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
the Zoning Ordinance Amendment as read by the City Clerk, by title only, as follows:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY
LOCATED ON THE SOUTH SIDE OF HAZLETTVILLE ROAD, WEST OF WYOMING
MILL ROAD.
FIRST READING - PROPOSED ORDINANCES
Council President Williams reminded the public that copies of the proposed ordinances are
available at the entrance of the Council Chambers or can be obtained from the City Clerk's
Office. Final action by Council on the proposed ordinances will take place during the Council
Meeting of March 22, 2010.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
the Ordinance Amendment as read by the City Clerk, by title only, as follows:
< PROPOSED ORDINANCE #2010-07 AMENDING CHAPTER 98 - STREETS, SIDEWALK
AND OTHER PUBLIC PLACES, CHAPTER 110 - UTILITIES, ARTICLE III - WATER
SERVICE, CHAPTER 110 - UTILITIES, ARTICLE IV - SEWER SERVICE, AND
APPENDIX F - FEES AND FINES (REFERRED BY THE UTILITY COMMITTEE)
< PROPOSED ORDINANCE #2010-06 AMENDING CHAPTER 102 - TAXATION,
ARTICLE VI - EXEMPTIONS; BOARD OF ASSESSMENT APPEALS, SECTION 102-183
- TAX EXEMPTIONS FOR SENIOR CITIZENS, SUBSECTION (B) - QUALIFICATIONS,
SUBSECTION (3) - EXCLUSIONS FROM INCOME (REFERRED BY THE LEGISLATIVE,
FINANCE, AND ADMINISTRATION COMMITTEE)
COUNCIL MEMBERS ANNOUNCEMENTS
Mr. McGiffin reminded members to mark their calendar for June 26, 2010 for the next African
American Festival.
Mr. Ruane reminded members that the St. Patrick=s Day Parade will be held on Saturday.
Page 25
CITY COUNCIL MEETING OF MARCH 8, 2010 PAGE 25
Mr. DePrima advised members that they were provided information on the latest estimate
(known as the mid-year review). This review has always been held during the first meeting in
March; however, it has been decided to postpone this review until the second meeting in March
since the Chairman of the Legislative, Finance, and Administration Committee wanted time to
discuss the Pay-for-Performance. He reiterated that the information has been provided in the
time frame that it is usually provided and that if there are any questions or concerns, he
suggested that members contact staff.
Mr. Salters moved for adjournment, seconded by Mr. Hogan and unanimously carried.
Meeting Adjourned at 8:59 P.M.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
March 8, 2010, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM/jg
mag2C1B.wpd
Exhibits Attached to Original Minutes and File Copy
Exhibit #1 - Presentation - Kent County Sport Facility: Making a Dream a Reality
Exhibit #2 - Water/Wastewater Service Handbook
Exhibit #3 - Lease Amendment - United Way Land Lease
Exhibit #4 - Letter in Opposition to House Bill #194
Page 26
EXHIBIT #1
Regular Council Meeting of 03/08/2010
Kent County Sport Facility:
Making a Dream a Reality
EXHIBIT #1
Greater Dover Committee
Regular Council Meeting of 03/08/2010
Page 27
Questions?
• What can meet the wants and needs of the
majority of youth in Kent County area?
• What can serve as an economic generator
by attracting visitors to Kent County?
• What is somewhat recession proof?
• What is healthy and receives parental
support?
• What can enhances overall quality of life for
everyone in Kent County?
Page 28
ANSWER
Sport
&
A Sport Facility
•
Page 29
IMAGINE
• 15 multipurpose fields hosting soccer, lacrosse,
field hockey and football.
• A lighted, Turf stadium seating for up to 1000,
• A concession stand and pro shop.
• Locker rooms, meeting rooms, and restrooms.
• Thousands of children and adults from Kent
County using the facility
• Thousands of outside visitors in Kent County
because of the facility
Page 30
IMAGINE
United Sports Training Center Downingtown, PA
Page 31
Benefits of Kent County Sport
Facility
• Economic Impact
• Increased Visitors/Tourist to County
• Improved Quality of Life in Kent County
• Recreational Outlet for Youth
• Increased Property Values and taxes
• Increased County and State Visibility
• Effective Use of County Land Bank
• Could host State Championships
Page 32
Benefits of Kent County Facility
• Allows Kent County and State to pursue bids
to host more youth sport events
• Increased Revenues for Hotels, Restaurants
and Shopping
• Job creation
• Better ROI than other possible facilities
• Brings people from different backgrounds
together
Page 33
Economic Impact Facts
• Amateur Sport
– Estimated $3.3 billion to $4 billion in direct spending at amateur
sports events in the United States.
– That's more than 10 times the estimated
economic impact of the 2005 Super Bowl.
• The Greater Chattanooga Sports and Events Committee
– estimated that economic impact generated from sporting events held
in Chattanooga in 2005, surpassed the $23.8 million mark.
Page 34
Economic Impact Facts
• U.S. Youth Soccer Region 1 Championships
• Charlestown, West Virginia
• Provided over $ 12 million in economic
impact
• Over 20,000 people in 5 days
Page 35
Why Tournaments?
• The visitors shop in our stores
• Eat in our restaurants
• Stay in our hotelspay accommodations tax
• Buy groceries and snacks
• Buy gas and pay tolls
• ** All with out-of-state money**
Page 36
To Host Tournaments
Selection criteria for tournament site
committees includes:
• At least 14 fields in one location
• Minimum number of Hotels in close proximity
• Variety of Restaurants in close proximity.
• Central geographic location for individuals
and or teams participating.
Page 37
Tournaments
• Imagine a permanent home for the
Tournament of Bands
• 10,000 participants plus 7,000 spectators
every year in November
• Economic impact to Kent County
$ 4 million
Page 38
Tournaments
• Imagine 4-6 regional tournaments for each of the
sports listed with economic impact of $2.5 million
each annually
• Imagine 2-4 national tournaments with economic
impact between $3-6 million dollars each.
• Imagine Tournament of Bands $4 million annually
• That’s an estimated economic impact of
$30 million in one year!!!
Page 39
Lost Business in 12 Weeks:
• US Lacrosse 2009 U-15 National Championships
– 64 Teams - July 2009 - 3000 attendees - 5 days
– Estimated economic impact = $ 2.7 million
– Needed 15 Lacrosse fields
• AY Football Regional Tournament November 2009
– 36 Teams - November 2009 - 3 days
– Estimated economic impact = $ 1.8 million
– Needed 6 Football Fields
• Tournament of Bands
– November every year needs a Football stadium
– Economic impact $ 4 million
Total Economic Loss = $ 8.5M in 12 weeks
Page 40
Example of Economic Impact to
Kent County
US Lacrosse U15 National Championship
Out of Town Average Length of
Item Visitors Spending/Day Stay (days) Multiplier Total
Spectators 5,000 $215 5 1.5 $8,062,500
Participants 1,536 $115 5 1.5 $1,324,800
Economic
Impact $9,387,300.00
Page 41
Delaware Sports Commission
“To bid, recruit, and host regional and national
sporting events at all levels of competition in the
State for the purpose of utilizing sports facilities in
the State, enhancing the economic development of
the State, and promoting Delaware as a destination
for amateur and professional sports.”
Goal: Attract sporting events to the State
for economic development
Page 42
We Need the Business
• Economic Recession has had a severe
effect on numerous Delaware businesses
• Hotel occupancy rates have dropped
dramatically in the past few years
• More and more hotels have been built, which
has flooded the market increasing inventory
by 40%
• Kent County Sport Facility can bring
business to the area
Page 43
Excess Demand for Fields
• With thousands of youth players participating
in sports, grass fields are being overused
and destroyed
• The overuse of these fields leads to a poor
quality playing surface LESS SAFETY
• Decreasing number of quality fields in
Delaware
• Kent County Sports Facility would alleviate
these problems
Page 44
Growth in Longfield Sports in
Delaware
2000 2008 13%of
Rate
Increase
Soccer 10,000 11,500 13%
Field 1372 1511 9%
Hockey
Lacrosse 400 960 42%
Page 45
Closest Competing Facilities:
• United States Training Facility in Downingtown PA
• Maryland Soccer Plex Germantown, MD
• Virginia Beach SportsPlex
Page 46
Could be this…
Maryland SoccerPlex Germantown, MD
Page 47
Or This…
Maryland SoccerPlex Germantown, MD
Page 48
Proposed Intersection
Page 51
Public/Private Partnership
• Public (Kent County)
– Land Bank
– Infrastructure
– Bonds and or Taxes
• Private (Sport Club)
– Expertise in Running
– Revenue Generation
– Secure Capital
Page 52
Stakeholders/Partners
• State Tourism Office
• Kent County Levy Court
• Kent County Convention and Visitors Bureau
• Greater Dover Committee
• Local Sport Organizations
• Members of the Local Community
Page 53
Path Forward
• Feasibility Study to include site evaluation
• Fund the study
• GDC has agreed to issue RFP
• GDC will fundraise for the project
Page 54
THANK YOU!
Copy of the presentation:
www.greaterdovercommittee.org
Page 55
EXHIBIT #2
Regular Council Meeting of 03/08/2010
City of Dover
Water/Wastewater
Handbook
Public Utilities Department
Effective Date: ?/??/2010
Page 56
City of Dover Public Utilities Department www.dover.de.us
Table of Contents
Introduction and Contact Information 5
I. Definitions 8
II. Process Outline 11
A. Applicable Projects 11
1. Renovation to Existing Building or Developed Site 11
2. Site Development 11
3. Subdivision 12
B. Waivers and Extensions 12
1. Administrative Waivers 12
2. Administrative Extensions 12
C. Approvals Required 13
D. Time Line 14
III. Plan Requirements 16
A. General Plan Data 16
B. Utility Plan Data 17
C. Standard Water / Wastewater Notes and Requirements 18
IV. Design and Installation Standards 20
A. General 20
B. Water 20
1. Design Requirements 20
2. Infrastructure Components 22
3. Installation Requirements 26
C. Wastewater 28
1. Design Requirements 28
2. Infrastructure Components 30
3. Installation Requirements 35
D. Wastewater – Pumping Stations 37
1. Design Requirements 37
2. Infrastructure Components 37
3. Installation Requirements 47
2 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 57
City of Dover Public Utilities Department www.dover.de.us
V. Construction Phase 50
A. Pre-Construction Meeting and Requirements 50
1. Scheduling 50
2. Submittals 50
3. Notice to Proceed 51
B. Inspection Requirements 51
1. Accessibility and Notification 51
2. Authority and Inspections 53
C. Water Testing Requirements 56
1. Pressure Testing 56
2. Sterilization Testing 57
D. Water Meter Inspections 58
E. Wastewater Testing Requirements 58
1. Air Testing 58
2. Hydrostatic Testing 59
3. Infiltration Inspections 60
4. Video Inspections 60
F. Tracer Wire and Identification Tape Verification 61
G. Final Inspection, Request for Acceptance and Dedication 62
1. Final Inspection 62
2. Request for Public Infrastructure Acceptance 62
3. Public Infrastructure Dedication 63
VI. Operations and Maintenance 64
A. Water 64
1. General 64
2. Repairs and Replacement 66
3. Water Distribution System Flushing Program 67
4. Fire Hydrant Flow Testing and Fire Suppression System Testing 68
5. Fire Hydrants 69
6. Water Meters 70
7. Backflow Prevention 71
8. Concerns and Problems 71
B. Wastewater 72
1. General 72
2. Repairs and Replacement 73
3. Maintenance 75
4. Sanitary Sewer Main Jetting Program 76
5. Wastewater Meters 76
6. Prohibited Discharges 77
7. Concerns and Problems 78
3 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 58
City of Dover Public Utilities Department www.dover.de.us
VI. Operations and Maintenance con.
C. Customer Services 78
1. Application for Service 78
2. Transference, Discontinuance and Suspension of Service 79
3. Water and Wastewater Rates and Tariffs 81
4. Billing 81
5. Payments 83
6. Tampering 84
APPENDIX A: Water / Wastewater Initial Plan Submission Checklist A1
APPENDIX B: Water / Wastewater Final Plan Submission Checklist B1
APPENDIX C: Water / Wastewater Pre-Construction Meeting Checklist C1
APPENDIX D: Acceptable Water Materials Checklist D1
APPENDIX E: Acceptable Wastewater Materials Checklist E1
APPENDIX F: Acceptable Wet Well/Dry Well Pump Station Materials Checklist F1
APPENDIX G: Acceptable Vacuum Primed Pump Station Material Checklist G1
APPENDIX H: Standard Details H1
APPENDIX I: Operations and Maintenance Exhibits I1
4 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 59
City of Dover Public Utilities Department www.dover.de.us
Introduction and Contact Information
Dear Customer:
The City of Dover Public Utilities Department provides public water and wastewater services to our
customers within the City limits and to some customers just outside the City limits. As of the effective
date of this Handbook, we currently register over 13,000 water accounts and over 11,500 wastewater
accounts. In order to ensure that our current and future customers, as well as developers and
consultants, are informed of our policies and procedures, we are pleased to provide this Handbook
which details design, construction and operation and maintenance aspects of both the water and
wastewater systems.
The City of Dover operates and maintains all components of the water system. The determined safe
capacity for the water system is currently 10.64 MGD (million gallons per day). In addition, staff
performs over 1,800 routine analyses per month to ensure the provided water meets all State and
Federal requirements.
The infrastructure elements of the City of Dover water system as of the effective date of this Handbook
include the following:
Fifteen (15) deep production wells (micro-plants) which deliver potable water directly to the
distribution system.
A shallow well field consisting of seven (7) production wells that supply water to the water
treatment plant. The water treatment plant in turn delivers potable water directly to the
distribution system.
Six (6) elevated storage tanks with a combined capacity of 3.75 million gallons.
Approximately 195 miles of water main ranging in size from one and one-half inches (1-1/2”) to
sixteen-inches (16”).
The distribution system also contains over 1,600 fire hydrants and 1,800 division valves.
The City of Dover operates and maintains all components of the wastewater collection system. The
wastewater that is collected is then sent to the Kent County wastewater system for treatment. The
average daily flow from the City of Dover system to the Kent County system is approximately 4.5 MGD
(million gallons per day). Industrial waste lab analyses are performed to ensure compliance with Kent
County regulations for treatment. The County has established regulations, which are herein adopted by
reference, prohibiting various discharges to the system, that could threaten protect public safety and
5 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 60
City of Dover Public Utilities Department www.dover.de.us
the physical integrity of the system, violate any of its permit requirements or preclude the use of the
most cost-effective alternatives for treatment and disposal.
The infrastructure elements of the City of Dover wastewater system as of the effective date of this
Handbook include the following:
Forty-one (41) pumping stations.
Approximately 185 miles of gravity sanitary sewer main and force main ranging in size from
four-inches (4”) to thirty-six inches (36”).
Due to the extent of the City of Dover’s water and wastewater system, we hope that this Handbook will
assist customers, developers, contractors and consultants in understanding the policies and procedures
associated with the water and wastewater utility systems. In turn, this will help make it easier for you to
do business with the City of Dover Public Utilities Department. If you have any questions, please don’t
hesitate to contact us through our website, www.dover.de.us, or by phone, at 302.736.7070. Additional
contact information is also provided on the following page for your use.
Thank you for your interest in the City of Dover and for allowing us to serve your needs.
Sincerely,
Ronald Lunt Sharon Duca, P.E.
Public Utilities Director Water/Wastewater Manager
6 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 61
City of Dover Public Utilities Department www.dover.de.us
WATER / WASTEWATER UTILITY CONTACT INFORMATION
CUSTOMER SERVICE Customers can contact this Department to obtain
5 East Reed Street information regarding rates, billing questions, meter costs,
Dover, DE 19901 deposits, credit information, and application for service.
302.736.7035
MISS UTILITY Contractors must contact Miss Utility prior to performing
800.282.8555 or 811 excavation to ensure that utilities are field located.
PLANNING & ZONING Owners, developers and consultants can contact this
City Hall – The Plaza Department regarding site development and subdivision
P.O. Box 475 plans, the administrative review and Development
Dover, DE 19903 Advisory Committee process and related issues.
302.736.7010
PUBLIC SERVICES – INSPECTIONS Owners, developers, consultants and contractors can
City Hall – The Plaza contact this Department regarding plumbing permits,
P.O. Box 475 building permits, impact fees and related issues.
Dover, DE 19903
302.736.7010
PUBLIC UTILITIES – DISPATCH Customers can contact this Division of the Public Utilities
Emergency Service – 24/7 Department 24 hours a day, 7 days a week to report water
302.736.7060 leaks, sewer backups or other concerns or service
problems.
PUBLIC UTILITIES – WATER TREATMENT & Customers can contact this Division of the Public Utilities
PRODUCTION Department regarding the annual water quality report and
860 Buttner Place other aspects of the City’s drinking water.
Dover, DE 19904
302.736.7070
PUBLIC UTILITIES – WATER / WASTEWATER Owners, developers, consultants, contractors and
CONSTRUCTION & INSPECTIONS customers can contact this Division of the Public Utilities
860 Buttner Place Department regarding projects currently under
Dover, DE 19904 construction by the Department as well as private
302.736.7070 construction projects.
PUBLIC UTILITIES – WATER / WASTEWATER Owners, developers, consultants, contractors and
ENGINEERING customers can contact this Division of the Public Utilities
860 Buttner Place Department regarding any aspect of this Handbook,
Dover, DE 19904 particularly the plan review process.
302.736.7070
PUBLIC UTILITIES – WATER / WASTEWATER Customers and contractors can contact this Division of the
MAINTENANCE Public Utilities Department regarding existing water and
860 Buttner Place wastewater infrastructure including repairs and other
Dover, DE 19904 maintenance activities.
302.736.7070
7 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 62
City of Dover Public Utilities Department www.dover.de.us
I. Definitions
Acceptable Materials Checklists – Checklists provided in Appendices D through G which must be
completed and submitted in conjunction with the Water / Wastewater Pre-Construction Meeting
Checklist. The Acceptable Materials Checklists contain materials which have been approved for use by
projects involving work related to the water utility system and/or wastewater utility system as well as
projects proposing wet well mounted or recessed wet well mounted pump stations. When the notation
“Full Specification Required” or similar language appears within the Acceptable Materials Checklists, or
when required materials do not appear within said lists, complete shop drawing submittals are required
for review by Public Utilities Department personnel.
Administrative Review Process – Site development projects which do not require submission to the
Planning Commission, as determined by the City Planner, shall be subject to the Administrative Review
Process. This process is administered through the City of Dover Planning Department and is not subject
to review through the Development Advisory Committee.
Business Day - Shall mean any day except Saturday or Sunday, a legal holiday prescribed by statute, or
recognized operator holidays. A business day begins at 7:00 a.m. and ends at 3:30 p.m.
Check Print - Plan submitted for any proposed renovation, site development or subdivision project
subsequent to the initial plan submission. One (1) complete set of construction plans, the scope of
which may vary depending upon the scale of the proposed project, must be submitted to the Water /
Wastewater Manager of the Public Utilities Department for review. Plans must meet all requirements of
the Water / Wastewater Handbook.
Development Advisory Committee (DAC) Review Process – Projects which require submission to
the Planning Commission, as determined by the City Planner, shall be subject to the Development
Advisory Committee (DAC) Review Process. This process is administered through the City of Dover
Planning Department.
Final Inspection - Following the completion of all work, the developer shall request a final inspection
through the Public Services Manager or Public Utilities Construction & Inspections Manager as
established through the pre-construction meeting. The final inspection will be scheduled within five (5)
to ten (10) days of the request. At the final inspection, all items of work, if any, which must be
completed, replaced or repaired, will be identified.
Final Plan Submittal - Upon receipt of notification from the Public Utilities Department, four (4)
complete sets of plans, signed and sealed by either a Delaware licensed Professional Engineer, or
8 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 63
City of Dover Public Utilities Department www.dover.de.us
Delaware licensed Professional Land Surveyor, as per Delaware State Code, in addition to a digital copy
of the plans compatible with AutoCAD in addition to all current City GIS requirements, and a digital copy
of the plans in .pdf format shall be submitted to the Water / Wastewater Manager for water and
wastewater utility plan approval. The Water / Wastewater Final Plan Submission Checklist shall also be
submitted in this package, this checklist can be found in Appendix B. Final plan approval is typically
provided from the Public Services and Planning & Zoning Departments.
Initial Plan - Initial plan submitted for any proposed renovation, site development or subdivision
project. Plans requiring Administrative review or Development Advisory Committee review are
submitted through the City of Dover Planning & Zoning Department. All other plans are submitted
directly to the Water / Wastewater Manager of the Public Utilities Department. One (1) complete set of
plans must be submitted for review.
Notice to Proceed - The Public Services Manager or Public Utilities Construction & Inspections
Manager, in accordance with the pre-construction meeting requirements, will issue a Notice to Proceed
for the project once all requirements established in the pre-construction meeting have been met. All
water and wastewater utility work must be scheduled directly with the Public Utilities Construction &
Inspections Manager.
Pre-Application Meeting (Public Utilities) – Unless waived by the Public Utilities Department,
developers / owners shall meet with Departmental staff to discuss utility availability and approval
requirements prior to the filing of an application and/or the submission of plans for review.
Pre-Construction Meeting - Following the receipt of all approvals, the developer shall request a Pre-
Construction Meeting through the Public Services Manager. This meeting will be scheduled to ensure
the attendance of all relevant City staff including Public Utilities Department personnel, the Developer,
his/her Engineer and Contractor, utility firms and other agencies as may be deemed appropriate. All
requirements set forth in the meeting must be met prior to the start of construction. A minimum of five
(5) business days notice is required to schedule this meeting for typical projects. A minimum of ten (10)
business days notice is required to properly schedule this meeting for large projects. Projects which do
not meet the project scope and scale requirements of a typical pre-construction meeting will be
identified in the Water / Wastewater Utility Plan Approval letter. These projects must schedule the pre-
construction meeting with the Public Utilities Construction & Inspections Manager.
Public Infrastructure Dedication - The Public Infrastructure Dedication procedure shall commence
upon satisfactory completion of every prior step and receipt of recommendations to accept
infrastructure from the Public Services and Public Utilities Departments. City Council shall grant final
approval of dedication. This approval will authorize the acceptance and ownership of all public
infrastructure associated with the project.
9 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 64
City of Dover Public Utilities Department www.dover.de.us
Renovation - A renovation project, for the purposes of this Handbook, consists of any project which
proposes to change the character of the water and/or wastewater service at the subject location.
Examples of such changes include, but are not limited to, changes in plumbing fixture quantity, changes
to the size of the water line serving the location, changes to the size of the sanitary sewer line serving
the location, and/or relocation of the water meter, water line and/or sewer line serving the location.
Request for Public Infrastructure Acceptance – The Request for Public Infrastructure is required for
all projects which contain components which are to be dedicated to the City of Dover. Upon completion
of the final inspection, and when all resulting punch list items have been completed to the satisfaction
of the Public Utilities Department, the Developer shall submit a written Request for Public Infrastructure
Acceptance to the Public Services Manager with copy to the Water / Wastewater Manager. This request
will be reviewed by the Public Services and Public Utilities Departments.
Site Development - The improvement of one or more parcels of land for residential, commercial or
industrial structures or groups of structures.
Subdivision - A division, or redivision, or any tract of land into two or more lots, plots, sites or parcels
for immediate or future sale or for building development.
Water / Wastewater Initial Plan Submission Checklist - Checklist provided in Appendix A that must
be submitted with all initial plan submissions. The checklist provides a listing of all principle
requirements that must be included as part of the plan set, or supplemental design material, that must
be submitted for review.
Water / Wastewater Pre-Construction Meeting Checklist - Checklist provided in Appendix C that
must be submitted to the Public Utilities Department representative at the pre-construction meeting.
All supplemental materials noted within the checklist must be included with the submission.
Water / Wastewater Utility Plan Approval - Approval granted by the Public Utilities Department
following receipt of final plans. This approval is valid for two (2) years.
10 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 65
City of Dover Public Utilities Department www.dover.de.us
II. Process Outline
A. Applicable Projects
1. Renovation to Existing Building or Developed Site
i. All renovation projects are required to bring the component of the water and/or
wastewater service to be changed up to current standards and specifications as
part of the proposed project.
ii. All projects requiring review through the Administrative review process or
through the DAC (development advisory committee) review process must
submit a plan for review. Plans shall be submitted in accordance with the
appropriate process requirements. For all other projects, the Water /
Wastewater will evaluate whether a plan is required or not based upon the size
and scope of the project. Should a plan be required, it shall be submitted
directly to the Water / Wastewater Manager.
iii. Approval for the water and/or wastewater utilities must be obtained from the
Water / Wastewater Manager prior to the start of work.
iv. Plumbing permit and building permit applications will be assessed for
applicability through the use of forms or similar means provided to the applicant
in conjunction with the appropriate application. These forms will be forwarded
to the Public Utilities Department to allow a representative of the Department
to contact the applicant directly regarding specific requirements and additional
information that may be required. All requirements will be provided under
separate cover to the applicant from the Water / Wastewater Manager and
copied to the Public Services Department in order to confirm completion with
the Public Utilities Department prior to final inspection by the Public Services
Department. All projects subject to these requirements shall not be closed out
until all requirements have been met.
2. Site Development
i. A plan must be submitted for any site development project proposed.
ii. These plans may be submitted directly to the Water / Wastewater Manager,
through the Administrative review process or through the DAC (development
advisory committee) review process, as applicable.
iii. Plan approval for the water and wastewater utilities must be obtained from the
Water / Wastewater Manager prior to the start of work.
11 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 66
City of Dover Public Utilities Department www.dover.de.us
3. Subdivision
i. A plan shall be submitted for any subdivision proposed.
ii. These plans may be submitted directly to the Water / Wastewater Manager,
through the Administrative review process or through the DAC (development
advisory committee) review process, as applicable.
iii. Plan approval for the water and wastewater utilities must be obtained from the
Water / Wastewater Manager prior to the start of work.
B. Waivers and Extensions
1. Administrative Waivers
i. The Public Utilities Director and/or Water / Wastewater Manager may waive the
requirements of this Handbook for any project when such requirements are
clearly not applicable for a project due to the project scope.
ii. The Public Utilities Director and/or Water / Wastewater Manager may accept,
for review, waiver requests from requirements within this Handbook when
implementation infeasibilities exist. They must ensure, however, that the
alternatives proposed are technically superior for the subject location, in no way
negate the overall intent of this Handbook, and represent options that are in
the best interest of the utility and the public in order to grant approval to such
requests.
iii. All waiver requests, other than those referenced in II.B.1.i., must be submitted
in writing with justification and alternatives provided.
2. Administrative Extensions
i. Water and wastewater utility approval is valid for two (2) years from the date of
issuance.
ii. All projects which have not started prior to the expiration date of the approval
must submit a request for an extension prior to the expiration date.
Justification for the request must be provided.
iii. All projects with expired approvals are subject to resubmission for review and
approval.
12 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 67
City of Dover Public Utilities Department www.dover.de.us
C. Approvals Required
In addition to approval from the Water / Wastewater Manager for the water and wastewater
utilities, approval from the following agencies may be required prior to the start of work,
depending on the scope of work for the project.
1. City of Dover Public Services and Planning & Zoning Departments - Approval from
the City of Dover Public Services and Planning & Zoning Departments is required for all
projects requiring Administrative plan review / approval or Development Advisory
Committee (DAC) / Planning Commission review / approval as per the City of Dover
Code. Approval from the Public Services and Planning & Zoning Departments,
respectively, is typically obtained after receiving approval from the Water / Wastewater
Manager.
2. State of Delaware Health and Social Services, Division of Public Health, Office of
Drinking Water - After all Public Utilities Department comments have been addressed,
and prior to water and wastewater utility approval, the water system plans must be
submitted to the Office of Drinking Water for review and approval. The
owner/developer will be responsible for providing all completed forms and plan sets, as
required, to the Public Utilities Department for submission to the Office of Drinking
Water. Plans will not be submitted to the Office of Drinking Water until review has been
completed by the Public Utilities Department. Applicability of this requirement will be
determined by the Public Utilities Department during the initial plan review.
3. State of Delaware Department of Natural Resources and Environmental Control
(DNREC), Division of Water Resources, Surface Water Discharges Section - Prior to
water and wastewater utility approval, the sanitary sewer system plans must be
submitted to the Surface Water Discharges Section for review and approval. The
owner/developer is responsible for providing all application fees, completed forms and
plan sets directly to the Surface Water Discharges Section. Applicability of this
requirement will be determined by the Public Utilities Department during the initial plan
review.
4. State of Delaware Department of Transportation (DelDOT) District Public Works
Section - All water and/or wastewater utility work proposed within State roads requires
a utility permit to be issued by the District Public Works Section of the Department of
Transportation. All completed forms and plan sheets required must be submitted to the
Public Utilities Department representative at the Pre-Construction Meeting. All utility
permit applications must be submitted directly by the utility.
13 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 68
City of Dover Public Utilities Department www.dover.de.us
5. The owner / developer is responsible for obtaining all permits necessary to complete
the work required by the project. These include, but are not limited to, DNREC
subaqueous lands / wetlands permits, US Army Corps 404 permits, sediment and
stormwater permits and railroad crossing permits.
D. Time Line
The following chart is an organizational tool to better understand the process from pre-
application meeting to plan approval through construction and dedication of utilities.
PROJECT TIME LINE
ACTION BY TIME FRAME
1. Pre-Application Meeting (Public Utilities) Developer Recommended
2. Application and Initial Plan Submission Developer n/a
Water / Wastewater Initial Plan Submission Checklist
(Appendix A - required with all initial plan submissions)
Public Utilities submission;
Administrative review submission; or
Development Advisory Committee (DAC) submission
3. Initial Plan Review Public Utilities 4 weeks
4. Check Print Submission Developer n/a
Public Utilities submission
5. Check Print Review Public Utilities 4 weeks
6. Final Plan Submission Developer n/a
Water / Wastewater Final Plan Submission Checklist
(Appendix B – required with all final plan submissions)
Public Utilities submission
7. Final Plan Approval Public Utilities 2 weeks
Public Services (Public
Planning & Utilities
Zoning only)
(as required)
8. Pre-Construction Meeting Request Developer n/a
14 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 69
City of Dover Public Utilities Department www.dover.de.us
PROJECT TIME LINE (continued)
ACTION BY TIME FRAME
9. Pre-Construction Meeting Public Services 1-2 weeks
Submit Water / Wastewater Pre-Construction or
Meeting Checklist and Acceptable Materials Public Utilities
Checklists to Public Utilities personnel at meeting (as required)
10. Notice to Proceed Public Services n/a
Upon completion of all pre-construction meeting or
requirements. Public Utilities
11. Construction Developer n/a
12. Inspections and Testing Public Utilities 48 hours
The Contractor must provide a minimum two (2)
business days notification.
13. Final Inspection Request Developer n/a
14. Final Inspection Public Services 1-2 weeks
or
Public Utilities
(as required)
15. Request for Public Infrastructure Acceptance Developer n/a
Submit request and all required materials to the
Public Services Manager and Water / Wastewater
Manager
16. Public Infrastructure Dedication Public Services upon
Public Utilities completion
City Council of all
requirements
15 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 70
City of Dover Public Utilities Department www.dover.de.us
III. Plan Requirements
All plan submissions shall be neat and legible. The following are minimum requirements to be
instituted for each plan submission and are subject to change. The Water / Wastewater
Manager may waive certain plan requirements for certain projects if warranted by the scope of
the project. In an effort to ensure complete plan submissions a checklist has been created to
assist the submitter with meeting plan requirements. The Water / Wastewater Initial Plan
Submission Checklist provided in Appendix A must be submitted with all initial plan submissions.
Subsequent plan submissions will not be reviewed unless all previous comments have been
clearly addressed within the plan set and accordingly identified within an itemized response
letter.
A. General Plan Data
1. Sheet dimensions shall be no larger than twenty-four (24) by thirty-six (36) inches.
2. Plan sheets shall be at a scale no smaller than 1” = 60’. Index sheets shall be at a scale
no smaller than 1” = 200’. (Whenever two (2) or more sheets are used to illustrate the
plan view, an index sheet is required, illustrating the entire project on one (1) sheet.)
3. Location map at a scale of 1” = 400’.
4. Title block.
5. Plan date and all revisions dates.
6. North arrow, scale, datum and benchmark.
7. Name and address of owner, developer (if applicable) and engineer or surveyor.
8. Seal and license number of the professional engineer or surveyor including a
certification as to the accuracy of the plan and survey.
9. Property lines of abutting land including property address and name of owner.
10. Existing and proposed boundaries of the property including easements and rights-of-
way.
11. Existing and proposed contours at intervals of one foot or less as well as significant
existing features. Finish floor elevations shall be included.
16 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 71
City of Dover Public Utilities Department www.dover.de.us
B. Utility Plan Data
1. A seven and one-half feet (7.5’) wide public utility easement shall be provided along all
side lot lines, to be unoccupied by buildings or other structures.
2. A fifteen feet (15’) wide public utility easement shall be provided along all rear lot lines,
to be unoccupied by buildings or other structures.
3. A ten feet (10’) wide public utility easement shall be provided along all front lot lines, to
be unoccupied by buildings or other structures.
4. All water and wastewater mains not located in the right-of-way shall be located within
five feet (5’) of the center of a twenty feet (20’) wide public utility easement.
5. A master phasing plan must be provided for all projects to be constructed in phases.
The phasing plan must be reflected throughout the plan set.
6. The size, type and location of all existing and proposed water mains, service lines,
valves, fire hydrants and other appurtenances must be shown on the plan.
7. The size, length, slope, type, flow direction and location of all existing and proposed
sanitary sewer mains and laterals must be shown on the plan. The size, type and
location of all existing and proposed sanitary structures (including manholes, cleanouts,
and pumping stations) must be shown on the plan. Rim and invert elevations must be
labeled on all sanitary structures.
8. Profiles of all sanitary sewer mains must be provided on the plans. All water, sanitary
sewer and storm sewer crossings, including services, must be shown on the profiles.
9. The proposed location of grease traps, if applicable, must be provided on the plans. In
addition, a construction detail for the structure proposed must also be provided.
10. A materials listing table for all proposed water and wastewater utility infrastructure
(including, but not limited to, water mains and services, fire hydrants, valves, sanitary
sewer mains and laterals, and manholes) must be provided on the plan.
11. Utility schedules for all wastewater utility infrastructure and storm water infrastructure
must be provided on the construction plans. At a minimum, the following must be
included:
i. Sanitary Sewer Manhole Schedule: manhole number, rim elevation, diameter,
depth, invert(s) in, and invert out.
ii. Sanitary Sewer Pipe Schedule: pipe number, size, material, length, slope, invert
in, and invert out.
17 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 72
City of Dover Public Utilities Department www.dover.de.us
iii. Storm Drain Manhole Schedule: manhole number, rim elevation, diameter,
depth, invert(s) in, and invert out.
iv. Catch Basin Schedule: catch basin number, inlet box type or size, cover slab
size, top unit type, frame/grate type, grate elevation, invert(s) in, and invert out.
v. Storm Drain Pipe Schedule: pipe number, size, material, length, slope, invert in,
and invert out.
12. A public infrastructure dedication table listing all proposed water and wastewater utility
infrastructure, storm water infrastructure, streets and alleys to be dedicated to the City
of Dover must be provided on the construction plan. At a minimum, the following must
be included:
i. Length, material and size of water and sanitary sewer mains.
ii. Quantity, length, material and size of water services and sanitary sewer laterals
(as measured to the right-of-way).
iii. Quantity of fire hydrants.
iv. Quantity and size of valves.
v. Quantity, size and vertical feet of manholes.
vi. Length, material and size of storm drain lines.
vii. Quantity, size and vertical feet of storm drain manholes and catch basins.
viii. Streets and alleys with stationing.
C. Standard Water / Wastewater Notes and Requirements
1. Hydrant connections by the contractor are prohibited. This method may not be utilized
during any phase of the project.
2. The site contractor shall contact the City of Dover Public Utilities Construction &
Inspections Manager at (302) 736-7070 prior to the start of construction. A
representative from the City of Dover Public Utilities Department must observe and
approve all water and sanitary sewer interconnections and testing. All water taps and
sanitary sewer connections must be performed by a City of Dover approved contractor.
The proposed location for the connection may need to be adjusted in the field due to
conditions of the existing main. Possible conditions that would require tapping /
connection relocation include proximity to pipe joints, other taps, concrete
encasements, conflict with other utilities, and the like. Test holes must be performed by
the contractor to determine the best tapping / connection location. The City of Dover
will not be held responsible for field conditions requiring adjustment of the tapping /
18 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 73
City of Dover Public Utilities Department www.dover.de.us
connection location or for any work required by the contractor to make an appropriate
and lawful connection.
3. All water and wastewater utility construction and materials shall meet all City of Dover
standards and specifications as well as current requirements and practices.
4. All existing utilities shall be field verified prior to the start of construction.
5. All existing utilities shall be adjusted to grade, and repaired or replaced when deemed
necessary by the Public Utilities Department, in all areas of disturbance associated with
construction.
6. Any existing water or wastewater utility lines not to be utilized by the proposed project
shall be properly abandoned at the mains by the developer / owner.
7. All non-metallic water lines (mains and services) shall be installed with a tracer wire and
identification tape. The wire shall be a minimum of twelve (12) gauge blue coated solid
copper wire, wrapped around the pipe, and extending up into all valve and curb boxes.
The identification tape shall be six-inches (6”) wide, laid one foot (1’) above the pipe,
with the following text: “Caution: Buried Water Line Below”.
8. All non-metallic wastewater lines (mains and laterals) shall be installed with a tracer
wire and identification tape. (Tracer wire is not required on gravity mains.) The wire
shall be a minimum of twelve (12) gauge green coated solid copper wire, wrapped
around the pipe. The identification detector tape shall be six-inches (6”) wide, laid one
foot (1’) above the pipe, with the following text: “Caution: Buried Sewer Line Below”.
9. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that
“No person shall discharge or cause to be discharged any stormwater, surface water,
uncontaminated groundwater, roof runoff, subsurface drainage, uncontaminated
noncontact cooling water or unpolluted industrial process waters to any sanitary
sewer”, this shall include condensate. Section 110-231 of the City of Dover Code defines
storm sewer as “…any system used for conveying rain water, surface water, condensate,
cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer,
owner and designers shall ensure during construction that no illegal discharges to the
sanitary sewer system are created as a result of the site improvements.
10. No trees may be planted within ten feet (10’) of water and wastewater utility
infrastructure.
11. No structures, including permanent signage, may be located within ten feet (10’) of
water and wastewater utility infrastructure.
12. Water and wastewater lines may not be located near any potential source of
contamination.
19 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 74
City of Dover Public Utilities Department www.dover.de.us
IV. Design and Installation Standards
A. General
All water and wastewater utility construction and materials shall meet all City of Dover
standards and specifications as well as current requirements and practices. In addition to the
standards and specifications contained herein, the following are incorporated by reference. In
the event of a conflict, the most stringent requirement shall apply.
1. City of Dover, Delaware Code of Ordinances and Charter, as revised
2. American Water Works Association (AWWA) Standards, as revised
3. Recommended Standards for Water Works, as revised (Ten States Standards)
4. Recommended Standards for Wastewater Facilities, as revised (Ten States Standards)
5. Delaware Department of Transportation Utilities Manual, as revised
6. Kent County, Delaware Code of Ordinances, Part II, Chapter 180 Sanitary Standards, as
revised
7. State of Delaware Administrative Code, Title 7, Section 7200 Surface Water Discharge
Section, as revised
8. State of Delaware Administrative Code, Title 16, Section 4462 Public Drinking Water
Systems, as revised
9. Delaware State Fire Prevention Regulations, as applicable, as revised
10. American National Standards Institute (ANSI) standards, as applicable, as revised
11. American Society for Testing and Materials (ASTM) / ASTM International standards, as
applicable, as revised
B. Water
1. Design Requirements
i. Sizing calculations must be submitted for all water mains, as required by the
Public Utilities Department.
ii. Design Capacities
In general, water lines shall be designed for the estimated contributory
demand to be served in the future as defined by the Public Utilities
Department.
20 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 75
City of Dover Public Utilities Department www.dover.de.us
Provisions shall be made to extend water service / mains to all adjoining
properties, parcels or lots, regardless of ownership or control of
adjoining properties, parcels or lots, as required by the Public Utilities
Department.
The design of extensions to the existing water system shall be based on
data if adequate records are available. In the event that adequate
records are not available, or when new systems are being established,
the design criteria shall not be less than 250 gpd per equivalent dwelling
unit (EDU).
iii. Sizing calculations must be submitted for all water service lines greater than
one-inch (1”).
iv. Water usage projections (peak flows and plumbing fixture data) must be
submitted for all uses other than single-family dwellings. Projections for
domestic use and irrigation (if applicable) must be provided. All meters will be
sized by the Public Utilities Department. Meter sizes must be provided on all
plans prior to approval.
v. Any other data determined during review to be necessary to justify the design.
vi. All water mains located within public right-of-ways shall be offered for
dedication to the City of Dover and thereafter will be maintained by the City of
Dover.
vii. The owner / developer is responsible for all costs associated with all water
infrastructure upgrades or extensions required to provide adequate fire and
domestic service and capacity in relation to the project proposed.
viii. Connections and Taps
All connections / taps to existing water mains shall be performed by the
Public Utilities Department or by an approved utility contractor.
All connections / taps required for Site Plan and Subdivision projects
shall be completed by the Developer, at his / her expense, through an
approved utility contractor in accordance with the approved plans.
All connections / taps required for existing, developed residential lots
shall be performed by the Public Utilities Department, or by an
approved utility contractor, as determined by the Department. When
work is to be performed by the Public Utilities Department, the property
owner shall submit the necessary funds, prior to installation, to the City
of Dover for all labor, material and equipment required to install new
connections from the main to the curb stop. The charge for making a
21 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 76
City of Dover Public Utilities Department www.dover.de.us
water tap and installing a service line to and including the curb box shall
be in accordance with a schedule set by City Council and set forth in the
rules and regulations of the water system. These charges shall be due
and payable prior to installation.
2. Infrastructure Components
i. All materials shall be in conformance with the Acceptable Water Materials
Checklist provided in Appendix D.
ii. Water Mains
The minimum size for all water mains shall be eight-inches (8”).
Larger mains may be required to meet service requirements. This shall
be determined by the Public Utilities Department and conveyed during
the plan review process.
All water mains shall be cement lined Class 52 ductile iron pipe. All
ductile iron pipe shall be in accordance with AWWA C151, latest
revision (ANSI A21.51) and shall be in eighteen to twenty feet (18’-20’)
lengths with single rubber gasket (push-on) joints in accordance with
AWWA C111, latest revision (ANSI A21.11). All Class 52 ductile iron pipe
shall be in accordance with AWWA C150, latest revision (ANSI A21.50).
A minimum of forty-eight inches (48”) of cover shall be provided over all
water mains.
Water mains shall be located under the street, a minimum of four feet
(4’) horizontally from the face of the curb.
A minimum ten feet (10’) horizontal and eighteen-inch (18”) vertical
separation, as measured from the outside of each pipe, shall be
provided for all water mains from sanitary sewer (gravity lines and force
mains). This shall be the case whether the water main is above or
below the sewer. Wherever possible the sewer shall be beneath the
water main. Crossings shall be arranged so that the sewer joints will be
equidistant and as far as possible from the water main joints.
A minimum eighteen-inch (18”) vertical separation, as measure from
the outside of each pipe, shall be provided for all water mains from
storm sewer. Due to the limiting width of some streets, the horizontal
separation between all water mains and storm sewer shall be provided
to the maximum extent possible. When feasible, a minimum ten feet
(10’) horizontal separation, as measured from the outside of each pipe,
22 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 77
City of Dover Public Utilities Department www.dover.de.us
shall be provided for all water mains from storm sewers in accordance
with Ten States Standards.
Water mains shall have a minimum of eighteen-inch (18”) clearance
from electric lines, gas mains, and all other utilities.
No water line (mains, services, etc.) shall pass through or come in
contact with any part of a sewer manhole.
All water mains must be looped. Dead end mains are not permitted.
The utility plan must incorporate the appropriate termination valves on
the water system between construction phases.
iii. Division Valves and Boxes
The maximum spacing between division valves shall be 800 feet.
Valves shall be provided at all water main intersections. The quantity of
valves shall be as determined necessary by the Public Utilities
Department to properly maintain and operate the water system.
Sufficient valves shall be provided to ensure that inconvenience and
hazards are minimized during repairs and to allow for effective flushing
and other maintenance practices.
All valves shall be right hand, resilient wedge gate valves.
Valve stem extensions shall have a two-inch (2”) square operating nut
and self-centering rock plate support. Valves with an operating nut
more than four feet (4’) below grade shall have a valve stem extension
to raise the operating nut to within three feet (3’) of the ground surface.
Valves shall be set vertical with a cast iron valve box provided for each
valve.
Valve boxes shall be centered and plumbed over the operating nut. The
valve box may not transmit shock or stress to the valve. All valve boxes
shall be set to the required grade (final grade).
Screw type adjustable valve boxes shall be adjusted to final grade by
excavating around the valve box, as necessary, and turning it to achieve
the required grade. Drop in valve box riser rings are not allowed.
iv. Fire Hydrants
The minimum size for all fire hydrant leads shall be six-inches (6”).
The maximum spacing between fire hydrants shall be 600 feet, as
measured along the curb.
23 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 78
City of Dover Public Utilities Department www.dover.de.us
Fire hydrants shall be placed between the curb and sidewalk at
intersections or centered on lot lines.
The minimum spacing between fire hydrants and hydrant valves shall be
fifteen feet (15’). (See construction detail W-3.)
All hydrant valves shall be right hand, resilient wedge gate valves.
Fire hydrants shall be set to stand plumb with the nozzles parallel with
or at right angles to the curb. The steamer nozzle shall face the curb.
v. Fire Mains
All structures requiring provision of a sprinkler system shall be served
with a combined, minimum eight-inch (8”) fire/domestic service.
The domestic water service shall be tapped off the fire/domestic service
line within five to ten feet (5’-10’) of the building. (This distance may be
expanded to allow adequate room for meter installation.)
A valve must be provided at the tee on the domestic water service line
to isolate it from the fire main.
The proposed restraining system for the fire main located within the
buildings must be clearly shown on the plans. The Public Utilities
Department will test and inspect all fire mains to a blind flange located
inside the buildings. The blind flange with tap is used for hydrostatic
pressure testing (200 psi for two (2) hours) and dechlorination. The
flange must be restrained in the direction of the pipe entering the
building. A pipe entering horizontally through a wall sleeve shall be
restrained with rods through the wall. A pipe entering vertically
through a slab shall be restrained through the floor to the ninety degree
(90 ) bend and thrust block. All rods shall be a minimum of ¾” all
thread. All pipes through walls and slabs must be Class 52 cement lined
ductile iron pipe.
vi. Service Lines
The minimum size of all water service lines shall be one-inch (1”).
Water service lines, from the main to the meter pit, shall extend
perpendicular to the main.
Water service lines shall be installed five feet (5’) to the right of the
sewer lateral as viewed from the center line of the street (or as per the
most recent Plumbing Code adopted by the City of Dover). This
requirement may be waived by the Water / Wastewater Manager for
non-residential applications if deemed appropriate.
24 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 79
City of Dover Public Utilities Department www.dover.de.us
Each property shall be served by a single water service line which shall
be furnished and installed by the property owner. In the event a
property contains multiple principle structures, such as shopping
centers or apartment complexes, the property shall be served by a
single water main where a water service line may be provided to each
principle structure. Each structure, which is capable of being offered for
sale, shall have its own separate water facilities.
vii. Curb Stops and Boxes
Curb stops shall be installed one foot (1’) outside of the right-of-way or
easement line for each lot, in a non-traffic bearing location.
Curb boxes shall be centered and plumbed over the curb stop. The curb
box may not transmit shock or stress to the curb stop. All curb boxes
shall be set to the required grade (final grade).
viii. Water Meters
Each water service line from the main to a property or principle
structure shall be metered by a single water meter so as to control the
entire domestic supply.
The Public Utilities Department shall determine the size, location, and
type of meter to be used for all applications.
All water meters shall be installed outside, in a meter pit or vault, on the
domestic water service, in a non-traffic bearing location (which includes
vehicular, bicycle and pedestrian traffic). Meter pits shall be located
within two feet (2’) of the right-of-way or easement line. In cases where
water mains are not located along the street frontage, or in non-
residential settings, the location of the meter pit or vault shall be
determined by the Public Utilities Department. The size, type and
dimensions of the pit or vault shall be approved by the Public Utilities
Department and shall give adequate access to the meter and permit its
installation, removal and maintenance.
All meter pits and vaults shall be set to the required grade (final grade).
All meter vaults shall be pre-cast or cast-in-place reinforced concrete.
Appropriate piping support and an access hatch centered over the
meter must be provided. All vaults deeper than four feet (4’) must also
be provided with a ladder.
All water meters, regardless of location, shall be accessible to the Public
Utilities Department and City of Dover meter reading personnel, at all
25 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 80
City of Dover Public Utilities Department www.dover.de.us
times. This requirement applies to all meters, existing and proposed,
regardless of location prior to the effective date of this Handbook. All
meters shall have a minimum clear area around the meter of three feet
long by three feet wide by six feet high (3’L x 3’W x 6’H) for accessibility
purposes. Existing non-pit meters shall not be blocked from access by
walls, equipment or any other materials.
All water meters must be installed per manufacturer’s
recommendations. All interior installations, should interior meter
replacement be permitted by the Public Utilities Director, shall be in a
horizontal position with the register upright and not more than twenty-
four inches (24”) above the floor line. (New interior meter installations
are not permitted.) All meter pit or vault installations shall have the
meter register located not more than twelve-inches (12”) or less than
six-inches (6”) below finished grade. The Water / Wastewater Manager
may approve additional distance between the meter register and finish
grade only if determined necessary due to the size of the meter.
In the event that an irrigation system is to be installed at a property, a
dual meter pit shall be required to house both the irrigation service and
the domestic service.
All meters shall be installed with backflow prevention. At a minimum,
this shall consist of an angle ball valve at the inlet and an angle cartridge
dual check valve at the outlet. Vault meters shall be provided with an
outside screw and yoke (OS&Y) valve at the inlet and a dual check valve
at the outlet. In addition, all installations, regardless of location, shall
include the most current remote metering devices in use by the City at
the time of installation.
3. Installation Requirements
i. All installations shall be in conformance with the Construction Details provided
in Appendix H.
ii. All existing utilities shall be field verified prior to the start of construction.
iii. All existing utilities shall be adjusted to grade, and repaired or replaced when
deemed necessary by the Public Utilities Department, in all areas of disturbance
associated with construction.
iv. Any existing water utility lines not to be utilized by the proposed project shall be
properly abandoned at the mains by the developer / owner.
26 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 81
City of Dover Public Utilities Department www.dover.de.us
v. Excavation and Trenching
The bottom of the trench shall be cut true and even so the barrel of the
pipe will have a bearing for the full length to provide a minimum cover
of four feet (4’) from finished grade and shall be excavated to such a
depth as will provide pipe elevations as indicated on the plans.
The Contractor shall keep all excavation free from water or other liquids
during the progress of the work.
The trenches for water service connections shall be excavated to the
minimum standard depth or to such depth as required to connect to
existing mains or service pipes.
No water service lines shall be laid in the same trench with gas pipe,
storm drain or sanitary sewer pipe or within three feet (3’) of any open
excavation or vault.
vi. Bedding
Continuous and uniform bedding shall be provided in the trench for all
buried pipe. Stones found in the trench shall be removed for a depth of
at least six inches (6”) below the bottom of the pipe.
The pipe shall be laid in the trench and secured in place with compacted
backfill up to the crown of the pipe thus ensuring adequate support for
the entire circumference of the pipe. Twenty-four inches (24”) of
uncompacted backfill cover shall then be laid above the pipe to
adequately protect the pipe before further compaction layers. Trench
backfill shall then be placed and compacted in eight-inch (8”) minimum
and twelve-inch (12”) maximum lifts.
Trench compaction shall be 95% maximum dry density. Compaction
shall be tested once per lift for each run of pipe.
vii. Installation of Pipe and Fittings
The laying and jointing of water main shall be in accordance with all
applicable standards and manufacturer’s recommendations.
All pipe and fittings shall be thoroughly cleaned before laying and shall
be kept clean until acceptance of work.
At the end of each work day, the end of the pipe shall be tightly closed
to prevent dirt, foreign substances or small animals from entering the
line.
Pipe and fittings shall be carefully handled and lowered into the trench.
Special care shall be taken to make sure all pipes are well bedded on a
27 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 82
City of Dover Public Utilities Department www.dover.de.us
solid foundation. Any defects due to settlement shall be corrected by
the Contractor at his/her expense.
Where the manufacturer’s recommended pipe joint deflection is
exceeded, mechanical joint bends shall be required and installed to the
satisfaction of the Public Utilities representative.
Thrust blocks of Portland Cement Concrete Class B of adequate size and
weight shall be used on all pressure piping for all fittings and all bends,
including and in excess of eleven and one-quarter degrees (11-1/4°)
unless specifically called for otherwise on the plan. Thrust blocks
(buttresses) shall conform to the details shown on the plan and/or
construction details contained herein.
All tapping sleeves, tees, bends, plugs and hydrants shall be provided
with reaction blocking, tie rods and retainer glands designed to prevent
movement.
No pipe shall be laid upon a foundation into which frost has penetrated,
nor at any time when the Public Utilities representative shall deem
there is danger of frost penetration at the bottom of the excavation,
unless all requirements as to the minimum length of open trench and
promptness of refilling are observed.
C. Wastewater
1. Design Requirements
i. Sizing (flow) calculations must be submitted for all sanitary sewer mains
showing that velocity and all other requirements are met. Any projected future
flow requirements must be clearly identified.
ii. Design Capacities
In general, sewer lines shall be designed for the estimated contributory
population to be served in the future, plus adequate allowance for
infiltration, institutional and industrial flows for the basin as defined by
the Public Utilities Department.
Provisions shall be made to extend sewer service to all adjoining
properties, parcels or lots, regardless of ownership or control of
adjoining properties, parcels or lots.
The maximum hourly quantity of domestic wastewater, maximum
hourly quantity of wastewater from industrial plants and groundwater
28 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 83
City of Dover Public Utilities Department www.dover.de.us
infiltration shall be considered in determining the capacities of sanitary
sewers.
The design of extensions to existing wastewater collection systems shall
be based on data if adequate records are available. In the event that
adequate records are not available, or when new systems are being
established, the design criteria shall not be less than 250 gpd per
equivalent dwelling unit (EDU).
Laterals shall be designed, when flowing full, assuming flow equivalent
to three (3) times the average daily flow. Main sewers shall be designed
based on Ten States Standards as represented by the following
equation:
Qpeak hourly/Qdesign avg = (18 + [P]1/2) / (4 + [P]1/2)
where: Qpeak hourly = maximum rate of wastewater flow
(peak hourly flow)
Qdesign avg = design average daily wastewater flow
P = population in thousands
iii. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other
than for single-family dwellings) showing that velocity and all other
requirements are met.
iv. Any other data determined during review to be necessary to justify the design.
v. All sanitary sewer mains located within public roadways shall be offered for
dedication to the City of Dover and thereafter will be maintained by the City of
Dover.
vi. The owner / developer is responsible for all costs associated with all wastewater
infrastructure upgrades or extensions required to provide adequate service and
capacity in relation to the project proposed.
vii. Connections and Taps
All connections / taps to existing sanitary sewer mains shall be
performed by the Public Utilities Department or by an approved utility
contractor.
All connections / taps required for Site Plan and Subdivision projects
shall be completed by the Developer, at his / her expense, through an
approved utility contractor in accordance with the approved plans.
All connections / taps required for existing, developed residential lots
shall be performed by the Public Utilities Department, or by an
29 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 84
City of Dover Public Utilities Department www.dover.de.us
approved utility contractor, as determined by the Department. When
work is to be performed by the Public Utilities Department, the property
owner shall submit the necessary funds, prior to installation, to the City
of Dover for all labor, material and equipment required to install new
connections from the main to the cleanout. The charge for making a
sanitary sewer tap and installing a lateral to and including the cleanout
shall be in accordance with a schedule set by City Council and set forth
in the rules and regulations of the wastewater system. These charges
shall be due and payable prior to installation.
2. Infrastructure Components
i. All materials shall be in conformance with the Acceptable Wastewater Materials
Checklist provided in Appendix E.
ii. Sanitary Sewer Mains
The minimum size for all sanitary sewer mains shall be eight-inches (8”).
All sanitary sewer mains shall be designed and constructed to give mean
velocities, when flowing full or half full, of not less than two feet per
second (2 ft/s) as per Ten States Standards. Full flow velocities shall not
exceed ten feet per second (10 ft/s).
The minimum slopes for sanitary sewer mains shall be as follows (or as
revised by current Ten States Standards):
Nominal Sewer Size Minimum Slope (feet/foot)
Eight-inch (8”) 0.0040
Ten-inch (10”) 0.0028
Twelve-inch (12”) 0.0022
Fifteen-inch (15”) 0.0015
Eighteen-inch (18”) 0.0012
Twenty-one inch (21”) 0.0010
Twenty-four inch (24”) 0.0008
Twenty-seven inch (27”) 0.00067
Thirty-inch (30”) 0.00058
Thirty-six inch (36”) 0.00046
30 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 85
City of Dover Public Utilities Department www.dover.de.us
Larger mains may be required to meet service requirements. This shall
be determined by the Public Utilities Department and conveyed during
the plan review process.
Main sewers shall be designed at minimum slope and maximum depth.
A minimum of three feet (3’) of cover shall be provided over all sanitary
sewer mains.
Sanitary sewer mains shall be located under the street, a minimum of
four feet (4’) horizontally from the face of curb.
A minimum ten feet (10’) horizontal and eighteen-inch (18”) vertical
separation, as measured from the outside of each pipe, shall be
provided for all water mains from sanitary sewer (gravity lines and force
mains). This shall be the case whether the water main is above or
below the sewer. Wherever possible the sewer shall be beneath the
water main. Crossings shall be arranged so that the sewer joints will be
equidistant and as far as possible from the water main joints.
Sanitary sewer mains shall have a minimum of eighteen-inch (18”)
clearance from drains, electric lines, gas mains, and all other utilities.
Poly Vinyl Chloride (PVC) pipe shall be used for gravity sanitary sewer
eight-inch (8") through fifteen-inch (15") diameter with a maximum
cover of eighteen feet (18'). PVC pipe shall conform to the size,
standard dimension ratio (SDR) and strength requirements of ASTM D-
3034 and ASTM F-679. The grade used shall be resistant to aggressive
soils or corrosive substances in accordance with the requirements of
ASTM D-543. SDR35 pipe shall be used for depths to twelve feet (12’).
SDR26 pipe shall be used for depths from twelve feet to eighteen feet
(12’ – 18’).
All PVC gravity sanitary sewer pipe and related fittings shall be
manufactured in accordance with ASTM C3034, SDR 35 and/or SDR 26,
Type PSM polyvinyl chloride wastewater pipe and fittings. PVC gravity
sewer pipe shall be supplied in twelve and one-half feet (12.5’) lengths
with bell-and-spigot joints. All fittings shall use rubber gaskets which
conform to the requirements of ASTM F477.
Ductile iron pipe (DIP) shall be used for all sanitary sewer lines with a
maximum cover greater than eighteen feet (18’). The DIP and fittings
used in sanitary sewer construction shall be mechanical joint and
conform to the applicable dimensions and tolerances of ANSI A21.50
and A21.51. Unless otherwise specified, DIP shall conform to ANSI
31 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 86
City of Dover Public Utilities Department www.dover.de.us
A21.51 standard thickness class 53. Every pipe and fitting shall be tar
coated on the outside and shall be cement lined on the inside. Cement
mortar lining shall be in accordance with ANSI A21.4. An approved
water stop gasket shall be used at manhole connections as directed by
the Public Utilities representative. DIP shall be grade 60-42-10 with
40/90 metal strength and shall be tested in accordance with ASTM
A339. Fittings for ductile iron pipe shall conform to ANSI A21.10.
Twelve-inch (12”) lines and smaller shall be Class 250. Sixteen-inch
(16”) lines and larger shall be Class 150.
All DIP shall be supplied in eighteen to twenty feet (18’-20’) lengths with
single rubber gasket (push-on) joints in accordance with ANSI
A21.11/AWWA C111.
iii. Manholes
One-tenth of a foot (0.1’) drop must be provided across all manholes.
The maximum spacing between manholes shall be 400 feet.
Manholes shall be placed at the points of all changes in alignment,
grade or size of sewer, intersection of sewers, and junction of streets.
Watertight manholes are required at all times.
Manhole frame covers may only be adjusted to finish grade with a
maximum of twelve-inches (12”) of non-porous, “red sewer” brick
above the manhole cone. Additional adjustment will require the
replacement of manhole sections or reconstruction of the cone.
Adjustable rings may not be used.
Flow channels shall be made to conform as closely as possible to the
shape of the connecting sewers to not obstruct maintenance, inspection
or flow in the sewers. Concrete channels shall be smooth and semi-
circular in section. When brick channels are used, the invert shall be
brick laid on edge. Precast channels may be utilized with the approval
of the Public Utilities Director with the understanding that if the
alignment of flow is off, the channel must be removed and a brick
channel installed to correct the flow alignment.
All manhole frames and covers shall be installed flush to the pavement,
or to final grade if located outside of the roadway.
Manholes shall be State of Delaware Department of Transportation
certified. Manholes shall be manufactured in accordance with ASTM
C478-80 and shall be precast with monolithic base and eccentric cone.
32 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 87
City of Dover Public Utilities Department www.dover.de.us
All manholes with a four foot (4’) inside diameter shall have five-inch
(5”) thick walls. All manholes with a five foot (5’) inside diameter shall
have six-inch (6”) thick walls.
Manholes shall be waterproofed on the exterior with a bituminous
coating. Inlet and outlet pipes shall be joined to the manhole with a
gasketed flexible watertight connection or any watertight connection
arrangement that allows differential settlement of the pipe and
manhole wall to take place. Connections to existing manholes shall be
made by core drilling and a water tight pipe to manhole connector must
be used.
A drop manhole should be provided for a sewer entering a manhole at
an elevation of twenty-four inches (24”) or more above the manhole
invert. If the drop is less than twenty-four inches (24”), the invert
should be filleted to prevent the deposit of solids.
All manholes over fourteen feet (14’) deep (top of rim to lowest point)
shall be at least five feet (5’) in diameter. All manholes with twenty-one
inch (21”) or larger pipes shall be at least five feet (5’) in diameter. The
standard joint shall be sealed with hydraulic cement meeting ASTM
C109 specifications. “O” ring joints shall conform to the requirements
of ASTM C443. A neoprene rubber flexible gasket shall be cast in the
manholes to tie the pipe to the manhole, in new manhole applications.
All manholes deeper than four feet (4’) shall have steps. Manhole steps
will be press set plastic, or approved equal. Steps will also be provided
on the outside of raised manholes when the top elevation is greater
than three feet (3’) above the existing ground elevation. Raised
manholes shall also be provided with a slab top to provide adequate
work area for access, maintenance and inspection purposes.
All industrial discharges shall provide an easily accessible monitoring
manhole. All discharge from the property must pass through one
monitoring manhole before entering the public sewer system.
Manholes in flood plains shall extend two feet (2’) above the 100-year
flood elevation or be provided with sealed covers.
All manhole frames and covers for new installations shall be of the
hinged, locking variety.
“Dog house” manholes are not permitted. In the event a manhole is
required on an existing line, a standard manhole must be installed on
the line in conjunction with bypass pumping operations.
33 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 88
City of Dover Public Utilities Department www.dover.de.us
iv. Laterals
The minimum size of all sanitary sewer laterals shall be six-inch (6”).
The minimum slope for all sanitary sewer laterals shall meet the current
plumbing standard accepted by the City of Dover, typically 0.0104
feet/foot for a six-inch (6”) sewer lateral.
Sanitary sewer laterals, from the main to the first cleanout located one-
foot (1’) outside the right-of-way or easement line, shall extend
perpendicular to the main.
Sanitary sewer laterals shall be installed to the center of each lot. This
requirement may be waived by the Water / Wastewater Manager for
non-residential applications if deemed appropriate.
Sanitary sewer laterals shall be connected directly to the main, not
manholes, unless impracticable, as determined by the Public Utilities
Department.
Sewer laterals are to be installed to one foot (1’) beyond the right-of-
way line at a typical depth of three feet (3’), preferably not exceeding
five feet (5’).
Each property shall be served by a single sanitary sewer lateral which
shall be furnished and installed by the property owner. In the event a
property contains multiple principle structures, such as shopping
centers or apartment complexes, the property shall be served by a
single sanitary sewer main where a sanitary sewer lateral may be
provided to each principle structure. Each structure, which is capable of
being offered for sale, shall have its own separate wastewater facilities.
v. Cleanouts
Cleanouts must be installed on sanitary sewer laterals within five feet
(5’) of the building, one foot (1’) outside of the right-of-way and at all
bends. The maximum spacing between cleanouts shall be 100 feet.
All cleanouts shall be constructed with a wye connection. Tee
connections are not acceptable.
A supporting, twelve-inch (12”) diameter concrete collar must be
provided in accordance with the Standard Details.
Cleanouts located within a traffic bearing location shall be installed with
a heavy duty cast iron frame and cover to prevent damage to the
cleanout and lateral. Applicable material is provided by East Jordan Iron
Works, part number 1566.
34 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 89
City of Dover Public Utilities Department www.dover.de.us
vi. Grease Traps
All structures containing food service facilities require the installation of
a minimum 1,000 gallon, two chamber grease trap.
All grease traps shall meet all current Kent County, Delaware Code of
Ordinances requirements (Article III, § 180-13)
3. Installation Requirements
i. All installations shall be in conformance with the Construction Details provided
in Appendix H.
ii. All existing utilities shall be field verified prior to the start of construction.
iii. All existing utilities shall be adjusted to grade, and repaired or replaced when
deemed necessary by the Public Utilities Department, in all areas of disturbance
associated with construction.
iv. Any existing wastewater utility lines not to be utilized by the proposed project
shall be properly abandoned at the mains by the developer / owner.
v. Excavation and Trenching
The bottom of the trench shall be cut true and even so the barrel of the
pipe will have a bearing for the full length to provide a minimum cover
of three feet (3’) from finished grade and shall be excavated to such a
depth as will provide pipe elevations as indicated on the plans.
The Contractor shall keep all excavation free from water or other liquids
during the progress of the work.
The trenches for sanitary sewer lateral connections shall be excavated
to the minimum standard depth or to such depth as required to connect
to existing mains or service pipes.
vi. Bedding
Continuous and uniform bedding shall be provided in the trench for all
buried pipe. Stones found in the trench shall be removed for a depth of
at least six inches (6”) below the bottom of the pipe.
The pipe shall be laid in the trench and secured in place with compacted
backfill up to the crown of the pipe thus ensuring adequate support for
the entire circumference of the pipe. Twenty-four inches (24”) of
uncompacted backfill cover shall then be laid above the pipe to
adequately protect the pipe before further compaction layers. Trench
35 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 90
City of Dover Public Utilities Department www.dover.de.us
backfill shall then be placed and compacted in eight-inch (8”) minimum
and twelve-inch (12”) maximum lifts.
Trench compaction shall be 95% maximum dry density. Compaction
shall be tested once per lift for each run of pipe.
vii. Installation of Pipe and Fittings
All sanitary sewer mains shall terminate at manholes between
construction phases. This may require sewer lines to extend beyond
proposed phase lines to the next manhole.
For any connection to an existing sanitary sewer manhole, the manhole
must be core drilled and a water tight pipe to manhole connector must
be used. The connector must be approved by the Public Utilities
Department prior to installation. The existing manhole flow channel
shall be reconstructed accordingly.
The laying and jointing of sanitary sewer main shall be in accordance
with all applicable standards and manufacturer’s recommendations.
All pipe and fittings shall be thoroughly cleaned before laying and shall
be kept clean until acceptance of work.
At the end of each work day, the end of the pipe shall be tightly closed
to prevent dirt, foreign substances or small animals from entering the
line.
Pipe and fittings shall be carefully handled and lowered into the trench.
Special care shall be taken to make sure all pipes are well bedded on a
solid foundation. Any defects due to settlement shall be corrected by
the Contractor at his/her expense.
No pipe shall be laid upon a foundation into which frost has penetrated,
nor at any time when the Public Utilities representative shall deem
there is danger of frost penetration at the bottom of the excavation,
unless all requirements as to the minimum length of open trench and
promptness of refilling are observed.
When making a lateral connection directly to an existing main line, the
following shall apply: on PVC main, cut hole in pipe using appropriate
saw, glue and Geneco (or approved equal) service saddle over hole.
36 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 91
City of Dover Public Utilities Department www.dover.de.us
D. Wastewater – Pumping Stations
1. Design Requirements
i. The Public Utilities Department shall determine during the initial plan review
phase as to whether pumping stations are to be offered for dedication to the
City of Dover or remain private. All stations dedicated to the City will be
maintained by the City of Dover and shall be turned over to the City
immediately following final acceptance.
ii. A hydraulic system analysis shall be provided for each pumping station including
force mains. It shall include the calculation of the system-head curves and the
use of these curves in conjunction with the characteristic curves of available
pumps. The criteria provided in C.1.ii. for average and peak flow shall be used
to determine the influent peak flow.
iii. Any other data determined during review to be necessary to justify the design.
iv. The owner / developer is responsible for all costs associated with all wastewater
infrastructure upgrades or extensions required to provide adequate service and
capacity in relation to the project proposed.
2. Infrastructure Components
i. All materials shall be in conformance with the Acceptable Wastewater Materials
Checklist provided in Appendix E, the Acceptable Wet Well/Dry Well Pump
Station Materials Checklist provided in Appendix F, and the Acceptable Vacuum
Primed Pump Station Materials Checklist provided in Appendix G.
ii. General
In the selection of a site for a pumping station, consideration shall be
given to its accessibility and its potential nuisance aspects. The station
shall not be subject to flooding. The 100-year flood plain elevation and
stormwater management pond elevation must be shown on the plan
when adjacent to the station. All equipment, electrical and mechanical
structures shall be located above the 100-year elevations. The station
shall be accessible during all types of weather with mobile equipment.
Stations shall be located at the lowest elevation including adjoining
areas. Adequate provisions must be made for continuous operation,
and for emergency treatment or storage of the wastewater in the event
of an unanticipated breakdown of the pumping station facilities or
power failures.
37 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 92
City of Dover Public Utilities Department www.dover.de.us
All pump stations to be dedicated to the City of Dover shall be located
on lots to be dedicated to the City of Dover. Stations may be located
within permanent public utility easements if site limitations exist with
approval from the Public Utilities Director.
All pump station sites shall include a paved driveway, fencing along the
perimeter of the site with a twelve feet (12’) double gate, and either
stone covering of entire site or landscaping as determined appropriate
by the Water / Wastewater Manager based upon the size of the station.
In general, all pumping stations shall be Wet Well / Dry Well Stations or
Smith & Loveless Vacuum Primed Stations. Grinder pump stations shall
be reserved primarily for single-family dwellings. Exceptions may be
made with the approval of the Water / Wastewater Manager. Ejector
stations are not permitted.
Ventilation shall be provided for all pumping stations, including both
wet wells and dry wells. Mechanical ventilation shall be provided for all
dry wells where equipment is located. The ventilating system and lights
shall be turned on by a switch located near the entrance, as well as
automatic, when feasible. The ventilation system of the wet well and
dry well of the station should be entirely separate, provide positive
ventilation and conform to Ten State Standards. All openings for pipes
or electric cables shall be caulked gastight. All pumping stations, except
those entirely below ground, shall be supplied with automatically
controlled heaters to prevent freezing in cold weather.
On stations pumping a minimum of 500,000 gpd, a channel grinder shall
be provided prior to the wastewater being pumped. The Muffin
Monster by JCM Environmental, or approved equal, shall be specified.
A bypass channel with a manually cleaned bar screen with openings not
exceeding two and one-half inches (2-1/2”) shall be provided where
channel grinders are utilized to provide screening while maintenance is
performed on the channel grinder. Manually cleaned screens should be
provided with stairway access, adequate lighting and ventilation, and
convenient and adequate means for removing screenings. If there is
not adequate room in the wet well for a channel grinder, a separate
station should be used.
Three (3) copies of station manuals and all other equipment manuals for
operations and maintenance shall be provided to the City of Dover.
38 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 93
City of Dover Public Utilities Department www.dover.de.us
iii. Pumps and Valves
Except where grinder pumps are used in order to minimize clogging,
open impeller or non-clog-type pumps capable of passing spheres of at
least three-inches (3”) in diameter shall be provided.
At least two (2) pumps shall be provided at all pumping stations. If no
more than two (2) pumps are provided, both should have the same
capacity and each shall be capable of pumping the maximum flow with
the standby pump out of service. It is desirable for three (3) or more
pumps to be provided which are designed for actual flow conditions and
of such capacity that with any one (1) pump out of service, the
remaining will be of sufficient capacity to handle maximum flows.
Each pump shall have an individual flow intake and suction line. Wet
well design should be such as to avoid turbulence near the intake.
Intake piping shall be a minimum of four-inches (4”) and shall be as
straight and short as possible.
Full-closing shutoff valves shall be placed on the suction line of each
pump except on vacuum primed pumps. Suitable shutoff and check
valves shall be placed on the discharge line of each pump. The check
valve shall be located between the shutoff valve and the pump. Valves
shall be capable of withstanding normal pressure and water hammer.
Valves shall not be located in the wet well.
In the event that all pumps are inoperable and must be pulled for
service a shutoff valve shall be provided downstream of the discharge
header and a blind flange provided on the discharge header or between
this shutoff valve and the individual pump shutoff valves.
iv. Electrical and Emergency Power Supply
Three-phase, two-hundred-and-eight-volt (3P, 120/208V Grounded Y)
service is recommended for use at stations requiring less than forty
horsepower (40 hp) motors. Where the stations have higher
horsepower requirements, three-phase, four-hundred-eighty-volt (3P,
277/480V Grounded Y) service is required.
The power panel shall typically include the meter pan, main breaker,
transfer switch (based upon generator type), generator hook-up (based
upon generator type), and a separate breaker for the RTU and radio to
be fed by normal power only.
All stations shall have a minimum ninety-five percent (95%) power
factor.
39 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 94
City of Dover Public Utilities Department www.dover.de.us
All pumping stations, except for single-family dwelling grinder pump
stations, shall be provided with emergency power supply. Portable
generator hookups and manual transfer switches and electric outlets
will be accepted for stations with a capacity of less than fifty (50) gpm.
Larger stations shall be provided with on-site emergency power
generation equipment and an automatic transfer switch. The automatic
transfer switch shall be provided with a bypass to allow for service of
the switch without shutting down the station. All on-site emergency
power generation equipment shall be provided with diesel engines and
comply with all federal, state and local regulations. Generator fuel
storage tanks shall be double walled, above ground and sized for forty-
eight (48) hours of operation at full load. The fuel tank shall be filled
prior to acceptance and a diesel fuel stabilizer added when appropriate
for the size of the tank. The on-site emergency power generation
equipment shall also be provided with a critical silencer / muffler,
weatherproof housing, battery charger, block heater and standard
monitoring and control panel. The installation shall be on a concrete
pad and in accordance with the manufacturer’s written requirements
and recommendations.
v. SCADA and Alarms
All stations shall be provided with a remote telemetry unit (RTU) that
shall be a panel-mount TG5700 RTU TELEGYR 5700.
The RTU Station Manager shall be equipped with RS232 Master Station
communication port equipped with TG6500 communication protocol,
RS485 I/O LAN communication port, and maintenance/diagnostic
communication port.
The RTU Combination Controller Card shall consist of eight (8)
status/SOE/accumulator input points, six (6) bipolar DC analog input
points, and four (4) trip/close point of on board (expandable to thirty-
two (32) with add-on relay assemblies).
General requirements of the RTU shall also include: SBO controller for
management of communications on I/O LAN; 125 VDC/120 VAC power
converter (100 watts); a 120 VAC battery charger with battery cables
and two (2) twelve volt (12V), seventeen amp hour (17AH) batteries;
mounting panel measuring twenty-inches high by twenty-inches wide
(20”H x 20”W); null modem cable to connect Station Manager to MDS
radio; and configuration/maintenance hardware manual.
40 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 95
City of Dover Public Utilities Department www.dover.de.us
The radio shall be a Microwave Data Systems MDS 9710, 900 mHz
SCADA radio. A battery charger with a twelve volt (12V), seven amp
hour (7AH) battery shall be provided. An antenna shall be mounted on
a pole of sufficient height to allow reliable communications with the
Public Utilities Department’s master station.
The RTU cabinet shall be a NEMA 4X cabinet, thirty-six inches high by
thirty-inches wide by eleven-inches deep (36”H x 30”W x 11”D). The
cabinet shall include a communications/power interface panel and
heater.
The alarm system shall be activated in cases of power failure, pump
failure or any cause of pump station malfunction as determined by the
Public Utilities Department. Alarms shall be connected to Public Utilities
System Operations.
vi. Metering and Controls
A magnetic flow meter and a seven-day circular, or strip, chart recorder
shall be provided at all pumping stations deemed necessary by the
Public Utilities Department. The flow meter shall provide flow
totalization and digital instantaneous flow rate in gpm. The flow tube
shall be sealed and suitable for continuous submergence. The magnetic
flow meter primary device shall not be located in the wet well. The
primary device shall be located in the dry well, above ground structure,
valve pit or separate metering pit. A separate sump pump shall be
provided to drain the flow meter location. The primary device shall be
located the appropriate number of straight upstream pipe diameters
from any bend, valve, "T" or other turbulence producing fitting as
required / recommended by the manufacturer. The primary device
shall be located where the pipe remains full at all times and shall not be
located on a vertical downward flowing pipe. The primary device shall
be provided with a bypass. Shutoff valves shall be provided on the
bypass and upstream and downstream of the primary device. The chart
recorder shall be located in an enclosure adjacent to the SCADA
enclosure.
The wet well must be large enough so that excessive pump starting and
stopping will not take place, which may result in overheating of motors
and controls. For constant speed pumps the minimum time interval at
peak flow between pump stop and lead pump start shall be five (5)
minutes. Soft starts shall be provided for all pumps of twenty
horsepower or greater and/or with peak flows greater than 500 gpm.
41 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 96
City of Dover Public Utilities Department www.dover.de.us
Variable speed pumps and variable frequency drive controls shall be
provided for all pumps discharging into a shared or transmission force
main or as deemed necessary by the Water / Wastewater Manager.
Except with suction lift pumps, the high-water level should never be
below the top of the pump casing and the impeller to ensure that the
pump will prime. The low-level setting should be twice the diameter of
the suction pipe but not be less than six-inches (6”) above the suction
pipe.
Control systems shall be of the encapsulated-float type or the
electronic-transducer type. Float-tube type and bubbler type controls
are not permitted. These devices shall be located so that they will not
be affected by flow currents created by the entering sewage or pump
suctions. Provision shall also be made to prevent floating material in
the wet well from interfering with the operation of the controls. The
pump control unit shall automatically alter the pumps in use and
provided with a manual override. The pump control cabinet shall be
provided with on-off-automatic switches and a green run light
(preferred) for each pump.
vii. Wet Well / Dry Well Stations
Pumps shall be of the centrifugal type, capable of passing a three-inch
(3”) sphere, located in the vertical position. They shall be self-cooling
(sewage cooled not preferred) and provided with covers for the volutes
for use during repairs. Extended shaft configurations are not preferred.
Full flow OS&Y resilient wedge gate valves shall be provided on the
suction piping and discharge side of the check valve. Check valves shall
be weighted swing arm types that accept air cushion and oil control
devices.
Support structures, thrust blocking and restraining systems shall be
provided for all piping and equipment. The motor control room and dry
well shall be climate controlled by an HVAC system. Dehumidification
must also be provided. Coatings and wall finishes shall be appropriately
selected based upon the application. All grating shall be non-skid
fiberglass material. An above grade pump around connection, station
bypass, must also be provided.
Wet wells shall be provided with sloped bottoms (minimum 1 to 1) to
prevent the buildup of grit and debris. The pump intake basin should be
long and narrow trench type to facilitate self cleaning. A fixed catwalk
42 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 97
City of Dover Public Utilities Department www.dover.de.us
shall be provided for easy cleaning of the wet well. Fall protection
devices shall be included in the wet well design. A wet well lining
system, poly-triplex or approved equal, shall be provided to prevent
deterioration of the wet well. Surface coatings and paint will not be
permitted.
The wet well and dry well shall be separated by a watertight and gas-
tight wall with separate entrances provided to each. Equipment
requiring regular or routine inspection and maintenance shall not be
located in the wet well.
A separate sump pump shall be provided for removal of leakage or
other water from the dry well floor. The sump pump shall be capable of
delivering twenty gallons per minute (20 gpm) discharge. The pump
shall discharge into the wet well with two check valves and ball valve on
discharge side of the check valve.
Stairwells shall be provided for dry well and wet well access, to allow
for inspection and maintenance of equipment, when station size
permits. Ladders may be provided in small stations where it is
impractical to install stairways. Manhole steps are not acceptable.
Wet well ventilation duct work shall be PVC and all mounting hardware
shall be corrosion resistant stainless steel. Wet well ventilation shall be
controlled by a percentage timer and hatch activated limit switch or
activated by the wet well light switch. Dry wells and motor control
rooms shall be ventilated to the outside supplied by fresh air.
All heavy equipment, in excess of 100 pounds shall be accessible for
removal or lifting by a crane or hoist. Hoists shall be positioned to allow
access to all major pump station equipment. Hatches in the floor shall
be positioned above the dry well to allow for easy removal of each
pump and other large equipment. Structural beams shall be provided in
the drywell where the lifting of equipment is out of reach from a hoist.
Cranes, hoists and lifting devices shall be electrically operated. Where
possible cranes shall extend to the exterior of the building for easy
loading of equipment on to a truck.
Lights and switches will be properly provided for all stations. All fixtures
shall be located so that they are easily accessible for maintenance with
a ladder. Adequate lighting shall be provided for convenience and
safety of operation.
43 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 98
City of Dover Public Utilities Department www.dover.de.us
Exterior security lighting shall be provided to function on a photo-cell or
timer. Additional lighting to operate manually should be provided
anywhere work might need to be performed (i.e. bypass connection,
loading dock, generator, etc.).
Interior lighting shall be come on instantly (high pressure sodium are
not preferred). Switches shall be located at all access points. At least
two light fixtures shall be provided at all interior locations no matter
what the size of the room. Lighting shall provide illumination for all
areas in the station and control panels. In dry wells lighting fixtures
shall be provided at different elevations to prevent shadowing from
structural supports and stairways. Wall mounted lights shall be
provided six feet (6’) above the floor level to provide additional
illumination at the floor. A vapor tight light fixture with lamp guard and
a one-hundred-watt incandescent bulb shall be installed in wet wells.
All lighting located where gases exist shall be explosion proof.
One-inch (1”) water service hose connections shall be provided at all
locations where cleaning may be required. Proper backflow prevention
and vacuum breaks (above flood level) shall be provided. A bathroom
with toilet and washing facilities shall be provided when station size
permits.
The level of noise control shall be considered based on the location of
the station. The safety of the worker and nuisance to neighbors should
be taken into consideration during the design. All combustion engines
such as generator sets and standby pumps shall be provided with a
minimum of Type 2 critically silenced enclosures and exhaust systems.
Noise reduction measures shall include specifying the quietest
equipment and installing sound proofing materials, acoustical linings
and enclosures.
viii. Vacuum Primed Stations
Wet well mounted vacuum primed package pump stations may be used
for up to eighteen and one-half feet (18-1/2’) of suction pipe. Recessed
wet well mounted vacuum primed package pump stations may be used
for over eighteen and one-half feet (18-1/2’) of suction pipe.
All wet wells shall have a minimum diameter of eight feet (8’). Wet
wells shall be provided with sloped bottoms (minimum 1 to 1) to
prevent the buildup of grit and debris. A wet well lining system, poly-
44 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 99
City of Dover Public Utilities Department www.dover.de.us
triplex or approved equal, shall be provided to prevent deterioration of
the wet well. Surface coatings and paint will not be permitted
Standard Equipment to be incorporated in the vacuum primed package
pump station shall include: automatic alternator, vacuum pumps,
duplex 120V GFI receptacle, spare Smith & Loveless mechanical seal,
control circuit breaker, three (3) original copies of the Smith & Loveless
operations and maintenance manuals, spare volute and seal gaskets,
and ventilation fan with thermostat.
Pre-Engineered Options to be incorporated in the vacuum primed
package pump station shall include: phase monitor relay, auxillary
heater, running time meter (totalizing and individual), NEMA starters, 3
KVA transformer (where required), selector switch (either Auto, Base 1
or Base 2), wet well blower, pump running lights, insulated hood,
separate pump valves for each pump (preferred if available), and timer
with two (2) second delay for electrode relay. Wet well mounted
stations shall also be provided with a wet well ladder to extend to the
normal wastewater level. Recessed wet well mounted stations shall
also be provided with a recessed wet well manway ladder, to extend to
the normal wastewater level, with ladder assist extensions and a
dehumidifier.
Special Modifications to be incorporated in the vacuum primed package
pump station shall include: remote contacts (pump #1 run, pump #2
run, high water alarm, lead pump (FS/LL), lag pump (FS/HL), and phase
monitor relay), additional one and one-quarter inch (1-1/4”) auxiliary
conduit, additional float switch for redundant high water alarm, and
spare sonic start probe and relay (if sonic start specified). Recessed wet
well mounted stations shall also be provided with an eight and one-half
feet (8’-6”) diameter layout, a shell height two feet (2’) above grade and
a switch in the manway entrance hatch that will turn on the wet well
blower when the hatch is opened.
Additional components to be included on the site shall include the
following: a one-inch (1”) water service as per standard details for the
cleaning of wet wells and other infrastructure, security/work light with
photo eye and manual override, flush mount safety equipment for wet
and dry well access and four-inch (4”) bypass pump hook-up with valves
as per standard details.
45 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 100
City of Dover Public Utilities Department www.dover.de.us
ix. Force Mains
All force mains shall be appropriately sized based upon the design
requirements for the pump station. All force mains four-inches (4”) and
larger shall be ductile iron pipe including an epoxy lining meeting all
current Kent County Department of Public Works requirements. Non-
metallic force main shall be AWWA C-900, minimum SDR18, or HDPE
DR11 (directional drilling applications) when warranted by the
application and approved by the Water / Wastewater Manager. The
following values of "C" are recommended for use in the Hazen-Williams
equation for computing the friction losses in a force main for design
conditions:
C Value Pipe Characteristics
Unlined cast iron, ductile iron and steel pipe: twenty-
100
four inches (24”) and larger (existing).
Unlined cast iron, ductile iron and steel pipe: twelve-
96
inches (12”) and larger (existing).
Unlined cast iron, ductile iron and steel pipe: four-
89
inches (4”) and larger (existing).
120 Cement-lined ductile iron pipe.
130 Various types of gasketed plastic pipe.
140 HDPE pipe.
For friction loss in pipe fittings the Hazen-Williams Minor Loss
Coefficients (K) are to be used as a multiplier of the velocity head
evaluated at the downstream velocity.
The minimum velocity shall not be less than two feet per second (2 fps)
for force main design. In general force main velocities shall not exceed
five and one-half feet per second (5-1/2 fps) for force main design. If
the total dynamic head at the pump discharge exceeds 100 feet, a larger
diameter force main will be used, provided that a velocity of two feet
per second (2 fps) can be maintained. Air release valves shall be
provided on lines at all high points in the profile. Blowoff valves shall be
provided at all low points in the profile. Grinder pump force mains shall
be laid on a rising profile as proceeding downstream. Where force
mains are constructed of material which might cause the force main to
46 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 101
City of Dover Public Utilities Department www.dover.de.us
be confused with potable water mains, the force main shall be
appropriately identified.
A minimum ten feet (10’) horizontal and eighteen-inch (18”) vertical
separation, as measured from the outside of each pipe, shall be
provided for all water mains from sanitary sewer (gravity lines and force
mains). This shall be the case whether the water main is above or
below the sewer. Wherever possible the sewer shall be beneath the
water main. Crossings shall be arranged so that the sewer joints will be
equidistant and as far as possible from the water main joints.
Force mains shall have a minimum of eighteen-inch (18”) clearance
from drains, electric lines, gas mains, and all other utilities.
All ductile iron pipe shall be in accordance with AWWA C151, latest
revision (ANSI A21.51) and shall be in eighteen to twenty feet (18’-20’)
lengths with single rubber gasket (push-on) joints in accordance with
AWWA C111, latest revision (ANSI A21.11). All Class 52 ductile iron pipe
shall be in accordance with AWWA C150, latest revision (ANSI A21.50).
3. Installation Requirements
i. All installations shall be in conformance with the Construction Details provided
in Appendix H.
ii. All existing utilities shall be field verified prior to the start of construction.
iii. All existing utilities shall be adjusted to grade, and repaired or replaced when
deemed necessary by the Public Utilities Department, in all areas of disturbance
associated with construction.
iv. Any existing wastewater utility lines not to be utilized by the proposed project
shall be properly abandoned at the mains by the developer / owner.
v. Excavation and Trenching
The bottom of the trench shall be cut true and even so the barrel of the
pipe will have a bearing for the full length to provide a minimum cover
of four feet (4’) from finished grade and shall be excavated to such a
depth as will provide pipe elevations as indicated on the plans.
The Contractor shall keep all excavation free from water or other liquids
during the progress of the work.
The trenches for water service connections shall be excavated to the
minimum standard depth or to such depth as required to connect to
existing mains or service pipes.
47 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 102
City of Dover Public Utilities Department www.dover.de.us
vi. Bedding
Continuous and uniform bedding shall be provided in the trench for all
buried pipe. Stones found in the trench shall be removed for a depth of
at least six inches (6”) below the bottom of the pipe.
The pipe shall be laid in the trench and secured in place with compacted
backfill up to the crown of the pipe thus ensuring adequate support for
the entire circumference of the pipe. Twenty-four inches (24”) of
uncompacted backfill cover shall then be laid above the pipe to
adequately protect the pipe before further compaction layers. Trench
backfill shall then be placed and compacted in eight-inch (8”) minimum
and twelve-inch (12”) maximum lifts.
Trench compaction shall be 95% maximum dry density. Compaction
shall be tested once per lift for each run of pipe.
vii. Installation of Pipe and Fittings
The laying and jointing of force main shall be in accordance with all
applicable standards and manufacturer’s recommendations.
All pipe and fittings shall be thoroughly cleaned before laying and shall
be kept clean until acceptance of work.
At the end of each work day, the end of the pipe shall be tightly closed
to prevent dirt, foreign substances or small animals from entering the
line.
Pipe and fittings shall be carefully handled and lowered into the trench.
Special care shall be taken to make sure all pipes are well bedded on a
solid foundation. Any defects due to settlement shall be corrected by
the Contractor at his/her expense.
Where the manufacturer’s recommended pipe joint deflection is
exceeded, mechanical joint bends shall be required and installed to the
satisfaction of the Public Utilities representative.
Thrust blocks of Portland Cement Concrete Class B of adequate size and
weight shall be used on all pressure piping for all fittings and all bends,
including and in excess of eleven and one-quarter degrees (11-1/4°)
unless specifically called for otherwise on the plan. Thrust blocks
(buttresses) shall conform to the details shown on the plan and/or
construction details contained herein.
All tees, bends and plugs shall be provided with reaction blocking, tie
rods and retainer glands designed to prevent movement.
48 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 103
City of Dover Public Utilities Department www.dover.de.us
No pipe shall be laid upon a foundation into which frost has penetrated,
nor at any time when the Public Utilities representative shall deem
there is danger of frost penetration at the bottom of the excavation,
unless all requirements as to the minimum length of open trench and
promptness of refilling are observed.
49 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 104
City of Dover Public Utilities Department www.dover.de.us
V. Construction Phase
A. Pre-Construction Meeting and Requirements
1. Scheduling
i. Following the receipt of all approvals, as outlined in this Handbook (Section II,
B), the developer shall request a Pre-Construction Meeting.
For all projects which require final approval from the Public Services
Department the developer shall request a Pre-Construction Meeting
through the Public Services Manager.
For all projects which only require water / wastewater utility plan
approval from the Public Utilities Department the developer shall
request a Pre-Construction Meeting through the Public Utilities
Construction & Inspections Manager.
ii. The Public Services Manager or Public Utilities Construction & Inspections
Manager, as per the above, will schedule the Pre-Construction meeting to
ensure the attendance of all relevant City staff, the Developer, his/her Engineer
and Contractor, utility firms and other agencies as may be deemed appropriate.
A representative from the Public Utilities Department must be in attendance for
all projects which have received Water / Wastewater final plan approval.
iii. A minimum of five (5) business days notice is required to schedule this meeting
for typical projects. A minimum of ten (10) business days notice is required to
properly schedule this meeting for large projects.
iv. All requirements set forth in the meeting must be met prior to the start of
construction.
2. Submittals
i. The Water / Wastewater Pre-Construction Meeting Checklist provided in
Appendix C shall be completed in its entirety and submitted to the Public
Utilities Department representative at the pre-construction meeting.
ii. In conjunction with the Water / Wastewater Pre-Construction Meeting
Checklist, the following items must be submitted:
Construction schedule.
List of subcontractors including contact information, as applicable.
50 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 105
City of Dover Public Utilities Department www.dover.de.us
Completed DelDOT Utility Construction Permit Application including 8-
1/2” x 11” drawing, as applicable. This application must be submitted to
DelDOT by the Public Utilities Department.
Completed Acceptable Water Materials Checklist provided in Appendix
D. This checklist must be completed for all projects involving work
related to the water utility system.
Completed Acceptable Wastewater Materials Checklist provided in
Appendix E. This checklist must be completed for all projects involving
work related to the wastewater utility system.
Completed Acceptable Wet Well/Dry Well Pump Station Materials
Checklist provided in Appendix F. This checklist must be completed for
all projects proposing a wet well mounted pump station.
Completed Acceptable Vacuum Primed Pump Station Materials
Checklist provided in Appendix G. This checklist must be completed for
all projects proposing a recessed wet well mounted pump station.
When the notation “Full Specification Required” or similar language
appears within the Acceptable Materials Checklists, or when required
materials do not appear within said lists, complete shop drawing
submittals are required for review by Public Utilities Department
personnel.
3. Notice to Proceed
i. The Public Services Manager or Public Utilities Construction & Inspections
Manager, in accordance with the pre-construction meeting requirements, will
issue a Notice to Proceed for the project once all requirements established in
the Pre-Construction Meeting have been met.
ii. All water and wastewater utility work must be scheduled directly with the Public
Utilities Construction & Inspections Manager.
B. Inspection Requirements
1. Accessibility and Notification
i. The Developer shall provide the Public Utilities Construction & Inspection
Manager or his/her representative (herein after referred to as Public Utilities
representative), access to all parts of the work and furnish such information and
assistance as is required to make a complete and detailed inspection.
51 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 106
City of Dover Public Utilities Department www.dover.de.us
ii. During construction, the Developer shall provide the Public Utilities
representative with at least two (2) working days notice prior to commencing all
major constructions activities at (302) 736-7070. Contractors are subject to
work stoppages and/or having work rejected if proper notification is not
provided. Activities requiring notification shall include, but are not limited to,
the following:
Installation of water or wastewater utilities.
Scheduling and testing of water or wastewater utility systems.
Restoration of utility trenches.
Placement of paving material. Underground utilities must be installed
and utility permits closed out prior to placement of paving and seeding.
iii. The site contractor shall contact the City of Dover Public Utilities Construction &
Inspections Manager at (302) 736-7070 prior to the start of construction. A
representative from the City of Dover Public Utilities Department must observe
and approve all water and sanitary sewer interconnections and testing. All
water taps and sanitary sewer connections must be performed by a City of
Dover approved contractor. The proposed location for the connection may
need to be adjusted in the field due to conditions of the existing main. Possible
conditions that would require tapping / connection relocation include proximity
to pipe joints, other taps, concrete encasements, conflict with other
utilities, and the like. Test holes must be performed by the contractor to
determine the best tapping / connection location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping /
connection location or for any work required by the contractor to make an
appropriate and lawful connection.
iv. All work requiring inspections shall be performed during the normal working
hours of 7:00 a.m. to 3:30 p.m., Monday through Friday, excluding holidays. If it
is required that work be performed outside this time frame, a request must be
made in writing to the Public Utilities Construction & Inspections Manager a
minimum of two (2) working days in advance. Approval must be received in
advance of scheduling work. The Contractor is responsible for reimbursement
to the City for all costs incurred as a result of providing the necessary Public
Utilities representative(s) on site for such work outside of normal working
hours.
52 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 107
City of Dover Public Utilities Department www.dover.de.us
2. Authority and Inspections
i. Public Utilities representatives shall ensure that all work is completed in
compliance with all local, state and federal requirements and the approved
plans. The Public Utilities representatives shall have the authority to require
any changes necessary to ensure all local, state and federal requirements are
met, including any changes necessary to the approved plans.
ii. Public Utilities representatives shall have the authority, but not the obligation,
to require changes in work practices, up to and including the stoppage of work,
if determined to be in the best interest of public safety and welfare.
iii. All plans shall have been prepared based upon the best available information.
Should existing facilities vary in size or any other characteristic from that shown
on the plans when exposed, the Contractor shall provide the necessary fitting,
or any other appurtenance necessary to connect and install the water or
wastewater line at their expense. All modifications in work, and proposed
appurtenance, shall be approved by the Public Utilities representative prior to
use.
iv. All existing water or wastewater lines, which are to be abandoned and are
located within the limits of excavation, shall be removed and become the
property of the Contractor after removal, unless otherwise noted. Pipe
openings due to abandoned pipes shall be plugged as required by the Public
Utilities Department.
v. Proper and adequate implements, tools, and facilities satisfactory to the Public
Utilities representative shall be provided and used by the Contractor for the safe
and convenient implementation of work. During the process of unloading, all
pipe and accessories shall be inspected by the Contractor for damage. The
Contractor shall notify the Public Utilities representative of all material found to
have cracks, flaws or other defects. The Public Utilities representative shall
inspect the damaged materials and have the right to reject any materials found
to be unsatisfactory. The Contractor shall promptly remove all rejected material
from the site. All materials shall be handled carefully, so as to prevent damage
to protective coatings, linings, and joint fillings; preclude contamination of
interior areas; and avoid jolting contact, dropping, or dumping. All work and
materials are subject to tests by the Public Utilities Department at such
frequency as may be deemed appropriate. While suspended and before being
lowered into laying position, each pipe section and appurtenant unit shall be
inspected by the Contractor to detect damage or unsound conditions that may
need corrective action or be cause for rejection. The Contractor shall inform the
53 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 108
City of Dover Public Utilities Department www.dover.de.us
Public Utilities representative of any defects discovered. The Public Utilities
representative may require corrective actions or order rejection as deemed
appropriate. Immediately before placement, the joint surfaces of each pipe
section and fitting shall be inspected for the presence of foreign matter, coating
blisters, rough edges or projections, and any imperfections so detected shall be
corrected by cleaning, trimming, or repair as needed.
vi. Trench excavation and bedding preparations shall proceed ahead of pipe
placement to permit proper laying and joining of the pipe units at the
prescribed grade and alignment without unnecessary deviation or hindrance.
All foreign matter or dirt shall be removed from the inside of the pipe and
fittings before they are lowered into position in the trench and they shall be
kept clean by approved means during and after laying. Materials shall be
carefully lowered into laying position by the use of suitable restraining devices.
Under no circumstances shall the pipe be dropped into the trench. At the time
of pipe placement, the bedding conditions shall be such as to provide uniform
and continuous support for the pipe between bell holes. Bell holes shall be
excavated as necessary to make the joint connections, but they shall be no
larger than would be adequate to support the pipe throughout its length. No
pipe material shall be laid in water or when the trench or bedding conditions are
otherwise unsuitable or improper. When in the Public Utilities representative's
opinion, placement or handling precautions prove inadequate, the Contractor
shall provide and install suitable plugs or caps effectively closing the open ends
of each pipe section before it is lowered into laying position, and they shall
remain so covered until removal is necessary for connection of an adjoining
unit. Unless otherwise permitted by the Public Utilities representative, bell and
spigot pipe shall be laid with the bell ends facing upgrade and the laying shall
start on the downgrade end and proceed upgrade. As each length of bell and
spigot pipe is placed in laying position, the spigot end shall be centered in the
bell and the pipe forced home and brought to correct line and grade. The pipe
shall be secured in place with approved backfill material, which shall be
thoroughly compacted by tamping around the pipe to a height of at least
twelve-inches (12”) above the top with hand operated mechanical tamping
devices or by hand. Trench compaction shall be 95% of AASHTO T180.
Compaction shall be tested once per lift for each run of pipe. The joint areas
shall remain exposed and precautions shall be taken to prevent the soil from
entering the joint space, until the joint seal is effective. Backfill in the bell area
shall be left loose until the next section of pipe is placed. Connection of pipe to
existing lines or previously constructed manholes shall be accomplished as
54 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 109
City of Dover Public Utilities Department www.dover.de.us
shown in the plans or as otherwise approved by the Public Utilities
representative. Where necessary to make satisfactory closure or produce the
required curvature, grade or alignment deflections at joints shall not exceed
that which will assure tight joints and comply with any limitations
recommended by the pipe manufacturer. Entrance of foreign matter into
pipeline openings shall be prevented at all times to the extent that suitable
plugs or coverings can be kept in place over the openings without interfering
with the installation operations.
vii. Public Utilities representatives shall have the right to limit the amount of trench
opened in advance of pipe laid, and the amount of pipe laid in advance of
backfilling, in order to ensure proper coordination of work and that all efforts
are in the best interest of the public.
viii. Public Utilities representatives shall be empowered at any time to require the
refilling of open trenches over completed pipelines if, in their judgment, such
action is necessary. The Contractor shall, therefore, have no claims for extra
compensation, even though to accomplish such refilling, he/she is compelled to
temporarily stop excavation or any other work.
ix. If work is stopped on any trench or excavation for any reason and the
excavation is left open for any unreasonable length of time in advance of
construction, in the opinion of the Public Utilities representative, the Contractor
shall, if so directed, refill such trench or excavation at his/her own expense and
shall not again open said trench until he/she is ready to complete the work
therein.
x. The terms "auger", "boring", "jack", "jacking", and "tunneling" in the plans
refers only to non-open cut construction. A Public Utilities representative must
be on site while this work is taking place. The Contractor shall inspect and verify
soil conditions to his own satisfaction in order to determine the type of
construction to employ. During the construction, the Contractor shall be
responsible for protecting all existing utilities above or below the pipe invert.
The minimum inside diameter of the casing pipe shall be four-inches (4”) greater
than the outside diameter of the bell of the carrier pipe. For any installation
beneath a railroad, the top of the casing pipe shall not be closer than the
specified dimensions indicated in the railroad permit. No jacking/augering of
pipe will be allowed below the water table unless the water table has been
lowered sufficiently to keep the water below the pipe being installed. The use
of water under pressure (jetting) will not be permitted to facilitate
jacking/augering operations. If any installation is augered, the head shall be
55 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 110
City of Dover Public Utilities Department www.dover.de.us
approved by the Public Utilities representative and the auger shall be located
six-inches (6”) behind the lead edge of the casing or carrier pipe. Casing chocks
shall be used as necessary to install the carrier pipe to the proper line and grade
inside the casing pipe. Voids between carrier and casing pipes shall be filled
with sand and the casing pipe sealed at both ends with a suitable material to
prevent water or debris from entering the casing pipe.
xi. Directional boring/drilling installation shall be accomplished where required on
the plans to minimize disturbance of existing surface improvements. A Public
Utilities representative must be on site while this work is taking place. The
installer shall have a minimum of three (3) years of experience in this method of
construction and have installed at least 1,000 feet of eight-inch (8”) or larger
diameter pipe to specified grades. The field supervisor employed by the
Contractor shall have at least three (3) years of experience, shall be at the site
at all times during the boring/drilling installation, and shall be responsible for all
of the work. The Contractor shall submit boring/drilling pit locations to the
engineer before beginning construction. The drilling equipment shall be
capable of placing the pipe as shown on the plans. The installation shall be by a
steerable drilling tool capable of installing continuous runs of pipe, without
intermediate pits, a minimum distance of 200 feet. The guidance system shall
be capable of installing pipe within one and one-half inches (1-1/2”) of the plan
vertical dimensions and two-inches (2”) of the plan horizontal dimensions. The
Contractor shall be required to remove and reinstall pipes which vary in depth
and alignment from these tolerances. Pull back forces shall not exceed the
allowable pulling forces for the pipe being installed. Drilling fluid shall be a
mixture of water and bentonite clay and shall be designed to meet existing soil
conditions. Disposal of excess fluid and spoils shall be the responsibility of the
Contractor.
C. Water Testing Requirements
1. Pressure Testing
i. Water main installations shall be pressure tested by the Contractor, utilizing
individuals qualified to perform the testing, and approved by the Public Utilities
representative. All pressure testing shall be performed under the Public Utilities
representative’s observation. All equipment and labor required to perform the
tests shall be furnished by the Contractor.
ii. The test shall be in accordance with AWWA C-600 and a pressure of 165 psi
shall be maintained for two (2) hours with no variation. Fire mains shall be
56 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 111
City of Dover Public Utilities Department www.dover.de.us
tested to the blind flange located inside the building. Fire mains shall be tested
at a pressure of 200 psi maintained for two (2) hours with no variation.
iii. The Contractor shall install any taps required at all high points on the line to
expel trapped air prior to conducting the pressure tests. Following the tests, all
such taps shall be tightly plugged with suitable threaded brass plugs. All costs of
tapping and plugging the line for this purpose shall be borne by the Contractor.
iv. Water for testing purposes shall be furnished by the City unless a fill tank is
required. The Contractor shall furnish and install adequate pumping and
gauging equipment to develop the required hydrostatic pressure and to
measure the pressure and amount of water lost by leakage. Duration of the
pressure test shall not be less than two (2) hours. All visible leaks shall be
repaired regardless of total leakage as shown by test.
v. If inspection or test shows defects, including visible leaks, such defective work
or material, shall be replaced at the expense of the Contractor, and inspection
and tests shall be repeated. All repairs shall be made with new material; failure
to meet the tests specified above will be sufficient cause to reject the work until
the defects are satisfactorily repaired. All expenses and costs incurred in
carrying out the specified tests shall be borne by the Contractor. The Public
Utilities Department shall have sole authority and responsibility to determine if
the tests are acceptable.
2. Sterilization Testing
i. Prior to the final connection of the newly installed pipe into the existing water
main, and with plugs used in the pressure test still in place on the installed pipe,
the entire system shall be sterilized, using the procedures as specified in AWWA
Standard C601-54 and as required by the Public Utilities representative.
Dechlorination of super-chlorinated lines shall be the responsibility of the
contractor.
ii. All disinfection procedures shall be in accordance with AWWA C-652. The
preferred method of chlorination is the installation of the appropriate amount
of H.T.H. 65%-35% granular chloride during the installation of the water main.
iii. Before the final connection is made, all surfaces of the relocated line, and the
existing water main that are to become part of the closing joint, including all
gaskets and glands, shall be thoroughly cleaned and shall be treated with a five
percent (5%) solution of Sodium Hypochlorite. Extreme care is to be exercised
in order to prevent the entrance of any contaminants into the main.
57 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 112
City of Dover Public Utilities Department www.dover.de.us
iv. The Contractor shall provide an adequate blow-off for use in flushing of the
main. The Public Utilities representative will collect water samples, for
bacteriological tests, from the blow-off. All samples will be delivered to the
Delaware State Laboratory by the Public Utilities representative for analysis.
Each section of water main shall receive approval from the Public Utilities
Department and Office of Drinking Water prior to being placed in service.
v. If testing results do not meet the requirements necessary, the Contractor shall
repeat sterilization procedures, and any other work determined necessary, as
directed by the Public Utilities representative, and tests shall be repeated.
Failure to pass the tests specified above will be sufficient cause to reject the
work until satisfactory results have been obtained. The Public Utilities
Department shall have sole authority and responsibility to determine if the tests
are acceptable.
vi. All expenses and costs incurred in carrying out the specified sterilization work
and tests shall be borne by the Contractor.
D. Water Meter Inspections
1. All water meter installations shall be inspected by a Public Utilities representative to
ensure compliance with all installation requirements, including completion of finish
grading. (See construction detail W-1.)
2. Requests for a meter inspection shall be made to the Public Utilities Department
providing at least two (2) working days notice.
3. Water service will not be turned on to the property or structure until the installation has
passed meter inspection.
E. Wastewater Testing Requirements
1. Air Testing
i. Sanitary sewer main installations shall be air tested by the Contractor, utilizing
individuals qualified to perform the testing, and approved by the Public Utilities
representative. All air testing shall be performed under the Public Utilities
representative’s observation. Copies of the testing results must be provided to
the Public Utilities representative. All equipment and labor required to perform
the tests shall be furnished by the Contractor.
ii. Air testing shall be completed after all the utility pipes have been installed in the
area to be tested and prior to commencement of the street construction.
58 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 113
City of Dover Public Utilities Department www.dover.de.us
iii. Air testing shall be performed on each section of sanitary sewer main, including
sewer laterals. A pressure of four (4) psi shall be maintained for five (5) minutes
with no variation.
iv. Disposal of any wastewater or test water into the City’s sanitary sewer system is
subject to charges in accordance with current wastewater rates and user fees.
Discharge requests must be submitted in writing to the Water / Wastewater
Manager. Written approval must be obtained prior to the occurrence of any
discharge to the system.
v. If inspection or test shows defects or testing failure, such defective work or
material, shall be replaced at the expense of the Contractor, and inspection and
tests shall be repeated. All repairs shall be made with new material; failure to
meet the tests specified above will be sufficient cause to reject the work until
the defects are satisfactorily repaired. All expenses and costs incurred in
carrying out the specified tests shall be borne by the Contractor. The Public
Utilities Department shall have sole authority and responsibility to determine if
the tests are acceptable.
2. Hydrostatic Testing
i. Sanitary sewer force main installations shall be hydrostatically tested by the
Contractor, utilizing individuals qualified to perform the testing, and approved
by the Public Utilities representative. All hydrostatic testing shall be performed
under the Public Utilities representative’s supervision. Copies of the testing
results must be provided to the Public Utilities representative. All equipment
and labor required to perform the tests shall be furnished by the Contractor.
ii. Hydrostatic testing shall be completed after all the utility pipes have been
installed in the area to be tested and prior to commencement of the street
construction.
iii. During the hydrostatic testing of force mains, a pressure of seventy-five (75) psi
shall be maintained for two (2) hours with no variation.
iv. Disposal of any wastewater or test water into the City’s sanitary sewer system is
subject to charges in accordance with current wastewater rates and user fees.
Discharge requests must be submitted in writing to the Water / Wastewater
Manager. Written approval must be obtained prior to the occurrence of any
discharge to the system.
v. If inspection or test shows defects or testing failure, such defective work or
material, shall be replaced at the expense of the Contractor, and inspection and
tests shall be repeated. All repairs shall be made with new material; failure to
59 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 114
City of Dover Public Utilities Department www.dover.de.us
meet the tests specified above will be sufficient cause to reject the work until
the defects are satisfactorily repaired. All expenses and costs incurred in
carrying out the specified tests shall be borne by the Contractor. The Public
Utilities Department shall have sole authority and responsibility to determine if
the tests are acceptable.
3. Infiltration Inspections
i. Each manhole, wet well or similar structure installed within the sanitary sewer
system shall be inspected for infiltration by the Public Utilities representative.
ii. If inspections show any defects or signs of infiltration, such defective work or
material, shall be repaired or replaced at the expense of the Contractor, and
inspection shall be repeated. All repairs shall be made with new material;
failure to prohibit infiltration into wastewater utility system will be sufficient
cause to reject the work until the defects are satisfactorily repaired or replaced.
4. Video Inspections
i. Within three (3) months of the Request for Public Infrastructure Acceptance, all
sanitary sewer lines and manholes shall be televised. All lines must be flushed
and cleaned by the Contractor prior to televising.
ii. Video inspection reports shall be reviewed with the Public Utilities
representative. Workmanship and cleanliness of the installation will be
checked. All video inspection reports shall be compatible with current Public
Utilities Department video inspection software and shall include the following:
All video inspections shall be performed utilizing the NASSCO PACP
(National Association of Sewer Service Companies Pipeline Assessment
Certification Program) methodology.
Reference the start and end of each video segment as it begins, by
clearly identifying the manhole number where the video segment
begins and the manhole number where the video segment ends.
Footages along the sewer line must be shown on the video report and
zeroed out at the beginning of each segment starting from the center of
the manhole.
The video camera shall be guided forward at a moderate to slow pace
along the bottom of the pipe as per PACP guidelines.
iii. If the video inspection shows any defects, such defective work or material shall
be replaced at the expense of the Contractor, and the video inspection and any
other required tests shall be repeated. All repairs shall be made with new
60 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 115
City of Dover Public Utilities Department www.dover.de.us
material; failure to meet testing requirements will be sufficient cause to reject
the work until the defects are satisfactorily repaired. All expenses and costs
incurred in carrying out the specified tests and video inspections shall be borne
by the Contractor. No sanitary sewer infrastructure will be accepted by the City
of Dover until all defects have been corrected. The Public Utilities Department
shall have sole authority and responsibility to determine if the tests are
acceptable.
F. Tracer Wire and Identification Tape Verification
1. All non-metallic water lines (mains and services) shall be installed with a tracer wire and
identification tape. The wire shall be a minimum of twelve (12) gauge blue coated solid
copper wire, wrapped around the pipe, and extending up into all valve and curb boxes.
The identification tape shall be six-inches (6”) wide, laid one foot (1’) above the pipe,
with the following text: “Caution: Buried Water Line Below”.
2. All non-metallic wastewater lines (mains and laterals) shall be installed with a tracer
wire and identification tape. (Tracer wire is not required on gravity mains.) The wire
shall be a minimum of twelve (12) gauge green coated solid copper wire, wrapped
around the pipe. The identification tape shall be six-inches (6”) wide, laid one foot (1’)
above the pipe, with the following text: “Caution: Buried Sewer Line Below”.
3. Within three (3) months of the Request for Public Infrastructure Acceptance, all mains,
laterals, and services requiring tracer wire and identification tape shall be verified for
the functionality of the same by a Public Utilities representative.
4. Requests for tracer wire and identification tape verification shall be made to the Public
Utilities Department providing at least two (2) working days notice.
5. If the tracer wire and identification tape verification identifies any defects or non-
functioning areas, such defective work or material shall be replaced at the expense of
the Contractor, and the tracer wire and detector tape verification and any other
required tests shall be repeated. All re-testing expenses shall be charged to the
Contractor by the Department. All repairs shall be made with new material; failure to
meet testing requirements will be sufficient cause to reject the work until the defects
are satisfactorily repaired. All expenses and costs incurred in carrying out the specified
tests shall be borne by the Contractor. No water or wastewater infrastructure will be
accepted by the City of Dover until all defects have been corrected. The Public Utilities
Department shall have sole authority and responsibility to determine if the tests are
acceptable.
61 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 116
City of Dover Public Utilities Department www.dover.de.us
G. Final Inspection, Request for Acceptance and Dedication
1. Final Inspection
i. The Developer shall request a final inspection when all work is complete. This
request shall be made to the Public Services Manager or Public Utilities
Construction & Inspections Manager as established through the pre-
construction meeting.
ii. The final inspection will be scheduled within five (5) to ten (10) days of the
request.
iii. The final inspection will be conducted by all relevant City staff. City staff shall
be accompanied by the Developer, and/or his/her representative, and inspect
the site. All items of work, if any, which must be completed, replaced or
repaired, will be identified.
iv. The Public Utilities Construction & Inspection Manager will provide the Public
Services Manager or the Developer, in accordance with F.1.i. above, a punch list
of the remaining work to be completed within ten (10) working days of the final
inspection. The punch list will include information required under Request for
Acceptance.
v. Should the Developer fail to request a final inspection, the Public Utilities
Construction & Inspection Manager may provide the Developer with a punch list
of all remaining work to be completed for the project at his/her discretion.
2. Request for Public Infrastructure Acceptance
i. A Request for Public Infrastructure Acceptance is required for all projects which
contain components which are to be dedicated to the City of Dover.
ii. Upon completion of the final inspection, and when all resulting punch list items
have been completed to the satisfaction of the Public Utilities Department, the
Developer shall submit a written Request for Public Infrastructure Acceptance
to the Public Services Manager with copy to the Water / Wastewater Manager.
iii. In conjunction with the written request, the following items must be included:
As-Built Infrastructure Plans including strike through corrections to the
materials listing table, utility schedules, and public infrastructure
dedication table.
Final Sanitary Sewer Line and Manhole Video Inspection Reports. Video
inspections and reports can be submitted on CD-ROM or DVD-ROM. The
video report will be used to view the condition of the sanitary sewer
62 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 117
City of Dover Public Utilities Department www.dover.de.us
pipe prior to acceptance. All defects shall be repaired by the Contractor
prior to submission. All video inspection reports shall become the
property of the City of Dover.
Release from Unpaid Bills (To be submitted to Public Services Manager
only.)
Ten percent (10%) Maintenance Bond (To be submitted to Public
Services Manager only.)
Verification of Installation of Street Signs (To be submitted to Public
Services Manager only.)
Verification of Installation of Permanent Monuments (To be submitted
to Public Services Manager only.)
iv. The Request for Public Infrastructure Acceptance will be reviewed by the Public
Services and Public Utilities Departments.
v. The Water / Wastewater Manager will provide a recommendation to accept or
deny acceptance of the water and wastewater utility infrastructure associated
with the Request for Public Infrastructure Acceptance to the Public Services
Manager.
3. Public Infrastructure Dedication
i. The Public Infrastructure Dedication procedure shall commence upon
satisfactory completion of every prior step and receipt of recommendations to
accept infrastructure from the Public Services and Public Utilities Departments.
ii. The Public Services Manager shall be responsible for all necessary forms and
documentation to be submitted to the appropriate Council Committee and to
City Council to request dedication of public infrastructure.
iii. City Council shall grant final approval of dedication. This approval will authorize
the acceptance and ownership of all public infrastructure associated with the
project. In addition, private infrastructure will also be identified. Private
infrastructure shall be maintained by others in accordance with any special
conditions associated with the project.
iv. Until dedication approval is granted by City Council, the Developer is
responsible for all costs associated with the repair and maintenance of all public
infrastructure. This includes, but is not limited to, reimbursement to the City for
repairs and maintenance performed when determined to be in the best interest
of public health, safety and welfare.
63 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 118
City of Dover Public Utilities Department www.dover.de.us
VI. Operations and Maintenance
A. Water
1. General
i. The City does not guarantee any special service, pressure, capacity or facility
other than is permitted by the ordinary and changing operating condition of the
City's water system, as the same exists from day to day. The city shall be free
and exempt from any and all claims for injury to any person or property damage
by reason of fire, water, and failure to supply water pressure or capacity.
ii. In case of breakdown, emergency or for any other unavoidable cause, the City
shall have the right to cut off the water supply temporarily in order to make
necessary repairs or connections. In such case, the City shall not be liable for
any damage or inconvenience suffered by the customer; or any claim against it
at any time for interruption in service, lessening of supply, inadequate pressure,
poor water quality, or any cause beyond its control. The same rule shall apply if
the City discontinues service pursuant to any other provision of this Handbook
or the City Code.
iii. The Public Utilities Department shall maintain all water utility facilities
dedicated to the City of Dover. All dedicated facilities shall be located within a
public right-of-way, public utility easement, or on City of Dover Property.
iv. It shall be unlawful for any person, other than Public Utilities Department
personnel, to open or close any curb stop or valve on the public water mains or
service lines.
v. The property owner shall maintain all water utility facilities that have not been
dedicated to the City of Dover.
vi. The City of Dover shall have the power to regulate all water utility
infrastructure, whether dedicated or undedicated, including that located on
private property at the present time and all infrastructure to be located on
private property in the future. Public Utilities Department and/or Fire Marshal’s
Office shall periodically inspect water utility infrastructure located on private
property, or undedicated, to see that it is functioning properly. If any defects
are discovered, the property owner shall be directed to correct such defects or
make such improvements, additions or alterations as deemed necessary to
64 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 119
City of Dover Public Utilities Department www.dover.de.us
make the water utility infrastructure functional at his/her expense. The
property owner shall be provided with a set time within which such repairs shall
be made. If the property owner shall fail to comply with the directive, water
service shall be discontinued until such time as the location reaches compliance
to the satisfaction of the Public Utilities Department, but in no event shall water
supply to fire hydrant(s) be discontinued. The Public Utilities Director may
proceed with the necessary repairs utilizing Department personnel or other
authorized independent contractors, if determined in the best interest of public
health, safety, and welfare. The property owner shall be billed for the work and
labor performed and materials and equipment furnished. In the event that the
property owner fails to pay said bills or expenses within 30 days from the date
the same are mailed to the owner, then such bills shall be entered in the
municipal lien docket as a lien owing the City and the same may be turned over
to the city solicitor for collection.
vii. Water service shall be resumed after discontinuance only when the conditions
under which such service was discontinued are corrected to the satisfaction of
the Public Utilities Department and upon the payment of all proper charges or
amounts. The customer or property owner shall pay a fee covering service
charges incident to discontinuance and resumption of water service.
viii. The City Manager and his/her authorized agents shall have the authority to
enter any building or premises within the City or service territory at reasonable
times to inspect all pipes, valves, spigots or other attachments or to make
necessary and reasonable tests consistent with good engineering practice to
determine condition or to determine if any violations of this Handbook or City
Code exist.
ix. The Public Utilities Department shall be responsible for the operations of all
water utility facilities to ensure that all local, state and federal laws and
requirements are met, including Drinking Water Standards.
In the event maintenance activities, repairs, replacements or upgrades
are determined necessary to dedicated facilities in order to meet the
requirements noted above, such activities shall be completed within the
time frame required.
When such activities are required of undedicated facilities, the property
owner shall perform such activities as directed by the Public Utilities
Department within the time frame required at his/her expense. If the
property owner shall fail to comply with the directive, all response shall
occur in accordance with Section VI.A.1.vi.
65 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 120
City of Dover Public Utilities Department www.dover.de.us
x. The customer will give immediate written notice to the Water / Wastewater
Manager of any proposed substantial increase or decrease in demand, or
change of use or purpose of the customer’s location. The water service
connection, sanitary sewer lateral connection and water meters for each
customer have a maximum capacity and no additional demand will be permitted
except by the written consent of the Department. Failure to give notice to
additions or changes will render the customer liable for upgrades required or
performed by the Department on behalf of the location.
xi. No trees may be planted within ten feet (10’) of water utility infrastructure.
xii. No structures, including permanent signage, may be located within ten feet
(10’) of water utility infrastructure.
xiii. Water lines may not be located near any potential source of contamination.
2. Repairs and Replacement
i. Public Utilities Department Responsibilities
The Public Utilities Department will immediately repair all water utility
infrastructure, including water mains, valves and fire hydrants,
dedicated to the City of Dover whenever leaks, breaks or other failures
are identified.
The Public Utilities Department will repair water services between the
main and the curb stop (when installed within one foot (1’) of the right-
of-way or easement line as per requirements), whenever leaks, breaks
or other failures are identified. For all other water service cases, repairs
or replacement shall be made to the right-of-way or easement line only.
The Public Utilities Department reserves the right to charge any party
responsible for damage to water utility infrastructure for labor,
equipment, materials and other expenses incurred due to the repair of
such facilities.
The Public Utilities Department will replace water utility infrastructure
dedicated to the City of Dover only when determined appropriate by
the City.
ii. Property Owner Responsibilities
The property owner shall immediately repair all undedicated water
utility infrastructure, including but not limited to water mains, valves,
fire hydrants, fire mains and service lines whenever leaks, breaks or
other failures are identified at his/her expense. Inspections shall be
66 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 121
City of Dover Public Utilities Department www.dover.de.us
performed by a Public Utilities representative in accordance with all
requirements of this Handbook. All said facilities, including fixtures and
other attachments furnished by the customer or property owner on the
property, shall be maintained in good order and condition and free from
leaks. The City shall in no event be responsible for maintaining any
portion of the water utility infrastructure owned by the customer
(infrastructure located outside of the right-of-way or easement), or for
damage done by water escaping there from.
The property owner shall have seventy-two (72) hours to complete all
repairs required to a standard water service line. Repairs required to all
other water utility infrastructure components (such as water mains)
shall be initiated within two (2) hours. If the Public Utilities Department
is aware of an issue, notice shall be provided at the property directly to
either the property owner or customer. If the property owner shall fail
to comply with the directive, all response shall occur in accordance with
Section VI.A.1.vi.
The property owner shall be responsible for the replacement and
maintenance of undedicated water utility infrastructure at his/her
expense. All replacement activities shall meet the requirements of this
Handbook including plan development.
3. Water Distribution System Flushing Program
i. Water system flushing is performed on a regular basis as a critical part of normal
system maintenance. The goal of this program is to ensure water quality is
maintained at its optimal level.
ii. Water mains are typically sized to allow adequate and safe flows for fire
protection. Under normal demand conditions, water moves through the mains
at a low velocity. This slow movement allows mineral deposits, to build up and
accumulate in pipes over time. The buildup can restrict water flow in the pipes
and contributes to corrosion, water color problems, and inadequate fire flow.
iii. The Public Utilities Department systematically utilizes fire hydrants, and other
outlets, throughout the system to perform the Water Distribution System
Flushing Program. This allows water to move through a water main at a high
velocity, creating a scouring action. The water is discharged through the
hydrant, or other outlet, which in turn removes settled particles, such as iron,
from the system. System evaluation is also performed during the flushing
operation.
67 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 122
City of Dover Public Utilities Department www.dover.de.us
iv. All water system flushing operations shall be scheduled by the Water /
Wastewater Manager to ensure the water distribution system is optimally
maintained based upon current practices.
v. Water system flushing shall be performed on all dedicated water mains on a
regular basis. Water system flushing on water mains which are not dedicated to
the City of Dover is the responsibility of the property owner. The City reserves
the right to require water system flushing to be performed, upon request, by
the owner / operator. Public Utilities Department personnel will perform
private system flushing, in conjunction with regular flushing operations, upon
request. Requests must be made in writing to the Water / Wastewater
Manager. The property owner shall reimburse the Public Utilities Department
for labor, materials and equipment perform water system flushing. The City
shall be free and exempt from any and all claims due infrastructure defects that
may be identified or repairs which may be required as a result of flushing
operations. Should the property owner opt to utilize an independent contractor
to perform flushing, these operations must be scheduled with the Water /
Wastewater Manager in conjunction with regular flushing operations.
4. Fire Hydrant Flow Testing and Fire Suppression System Testing
i. The Public Utilities Department performs fire hydrant flow testing to determine
the flow pressure and volume of water that is expected from each hydrant.
Flow testing is one of the ways the Department uses to ensure that hydrants are
operable and to determine any system limitations that may need addressed. All
hydrants are color coded following testing so Fire Department personnel can
identify what water flow a certain fire hydrant can deliver during an emergency
situation. Flow testing results are also utilized by sprinkler system designers to
ensure a system for a structure is appropriately designed.
ii. Flow testing on fire hydrants dedicated to the City of Dover shall be performed
by Public Utilities Department personnel only.
iii. Flow testing on fire hydrants which are not dedicated to the City of Dover is the
responsibility of the property owner. The City reserves the right to require flow
testing to be performed, upon request, by the owner / operator. Public Utilities
Department personnel will perform these tests upon request. Requests must be
made in writing to the Water / Wastewater Manager. The property owner shall
reimburse the Public Utilities Department for labor, materials and equipment to
flow test and appropriately mark the hydrant. Should the property owner opt
to utilize an independent contractor to perform these tests, the testing
operations must be scheduled with the Water / Wastewater Manager and flow
68 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 123
City of Dover Public Utilities Department www.dover.de.us
testing results must be submitted for review within five (5) business days of
testing completion.
iv. Sprinkler system designers may also request flow testing data through the
Public Utilities Department. Should more recent testing data be required, the
flow test shall be scheduled by the Water / Wastewater Manager.
v. All fire hydrant flow testing, whether performed by the Public Utilities
Department or through an independent contractor for dedicated and
undedicated facilities, shall be scheduled through the Water / Wastewater
Manager in order to maintain the integrity of the system and minimize system
disturbance. All requests to perform fire hydrant flow testing on undedicated
facilities by an independent contractor must be submitted in writing to the
Water / Wastewater Manager.
vi. Fire suppression systems are inspected and tested by an independent
contractor for the building owner or occupant. Testing activities to be
performed on systems connected to the water system, that will required water
usage, must be scheduled through the Water / Wastewater Manager in order to
maintain the integrity of the system and minimize system disturbance.
Scheduling requests must be made in writing. Within five (5) business days of
testing completion, a water usage report, including calculations must be
submitted to the Water / Wastewater Manager.
5. Fire Hydrants
i. It shall be unlawful for any person other than members of a Fire Department
engaged in the performance of their duties, any person in the event of an
emergency endangering life or property, or the Public Utilities Department for
authorized purposes to open, use or take water from any fire hydrant.
ii. Fire hydrants shall not be used for the filling of swimming pools. This shall be
accomplished only through the metered supply that serves the property.
iii. Fire hydrant connections by contractors are prohibited. This method may not
be utilized during any phase of a construction project.
iv. Fire hydrants shall not be used for the filling of tank trucks. The City has
provided a filling station for such use at the William Street municipal facility. All
tank trucks shall use this facility. Tickets can be purchased at 5 East Reed Street
for use of this service.
69 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 124
City of Dover Public Utilities Department www.dover.de.us
6. Water Meters
i. All water meters, regardless of location, shall be accessible to the Public Utilities
Department and City of Dover meter reading personnel, at all times. This
requirement applies to all meters, existing and proposed, regardless of location
prior to the effective date of this Handbook. All meters shall have a minimum
clear area around the meter of three feet long by three feet wide by six feet
high (3’L x 3’W x 6’H) for accessibility purposes. Existing non-pit meters shall
not be blocked from access by walls, equipment or any other materials.
ii. The Public Utilities Department shall maintain all water meters within the
system as far as ordinary wear and tear are concerned.
iii. All water meters should be routinely tested by the Public Utilities Department.
Should a customer contest the results of a routine test, all costs to retest the
meter shall be incurred by the customer. Should a customer desire to have
their meter tested before its next scheduled test date and the meter is found to
be correct within established tolerances as identified in this Handbook, all costs
to test the meter shall be incurred by the customer.
iv. Damage to any non-pit meter or radio read due to external causes due to
negligence, freezing, or hot water, or to any pit or vault meter or radio read due
to external causes due to negligence, shall be the responsibility of the property
owner. The owner shall reimburse the Public Utilities Department for labor,
materials and equipment required to repair or replace the meter or radio read.
v. All water meters and appurtenances shall be purchased by the customer
through the City of Dover. For all non City stocked meter sizes, the meters shall
be purchased by the customer through an approved vendor as directed by the
City. All new and replacement meters require authorization from the Water /
Wastewater Manager or his/her designated representative prior to purchase to
ensure appropriate sizing and location of the meter. (The customer shall be
responsible for the purchase and installation of the initial meter for a site as
well as any replacement meter that may be required due to a change in
demand. The Public Utilities Department will be responsible for the purchase
and installation of any replacement meter due to age or normal wear and tear.)
vi. Once water service is established through the initial service application, all
water meters registered with the City of Dover shall become the property of the
City.
vii. The City of Dover reserves the right to relocate water meters from inside a
facility or structure to outside the facility or structure. Said meters will be
70 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 125
City of Dover Public Utilities Department www.dover.de.us
installed within a meter pit or vault in accordance with the provisions of this
Handbook. This shall include the provision that each property or principle
structure shall be metered by a single water meter so as to control the entire
domestic supply.
7. Backflow Prevention
i. Backflow prevention is required at all connections to the City of Dover water
utility system to prevent contamination of the public water system from
backflow.
ii. All backflow prevention shall be provided through the use of dual check valves
to prevent against backsiphonage and backpressure. The dual check valve shall
be manufactured in full conformance with the standards established by the
American Water Works Association titled AWWA C510-07 (Standard for Double
Check Valve Backflow Prevention Assembly).
iii. Backflow prevention shall be provided on all domestic supply lines through the
installation of a dual check valve at the meter.
iv. Backflow prevention is required on all Class 3, Class 4, Class 5 and Class 6 fire
protection systems. Backflow prevention can be waived by the Water /
Wastewater Manger on Class 1 and Class 2 fire protections systems if all AWWA
requirements are met.
v. In all cases backflow prevention shall be installed before the first branch line
leading off the service line.
vi. The property owner shall be responsible for the testing, maintenance, repair
and replacement of all backflow prevention devices.
vii. Locations identified without the required backflow prevention assembly, or with
assemblies which do not function properly, will be provided written notice to
install / replace said device as per the requirements of this Handbook. The
property owner shall have fourteen (14) business days to complete all work
required. If the property owner shall fail to comply with the directive, all
response shall occur in accordance with Section VI.A.1.vi.
8. Concerns and Problems
i. Customers may contact the Public Utilities Department during the normal
working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, excluding
holidays, at 302-736-7070 with any questions or concerns regarding the City of
Dover Water Utility.
71 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 126
City of Dover Public Utilities Department www.dover.de.us
ii. Customers may contact the Public Utilities Department System Operations at
302-736-7060 or 302-736-7086 (twenty-four (24) hours a day, seven (7) days a
week) with any problems or emergencies relating to the City of Dover Water
Utility.
iii. The customer shall immediately notify the Public Utilities Department of
damage to or malfunction of the water meter as soon as it comes to his/her
knowledge.
B. Wastewater
1. General
i. The Public Utilities Department shall maintain all wastewater utility facilities
dedicated to the City of Dover. All dedicated facilities shall be located within a
public right-of-way, public utility easement, or on City of Dover Property.
ii. The property owner shall maintain all wastewater utility facilities that have not
been dedicated to the City of Dover.
iii. The City of Dover shall have the power to regulate all wastewater utility
infrastructure, whether dedicated or undedicated, including that located on
private property at the present time and all infrastructure to be located on
private property in the future. Public Utilities Department shall periodically
inspect wastewater utility infrastructure located on private property, or
undedicated, to see that it is functioning properly. If any defects are discovered,
the property owner shall be directed to correct such defects or make such
improvements, additions or alterations as deemed necessary to make the
wastewater utility infrastructure functional at his/her expense. The property
owner shall be provided with a set time within which such repairs shall be
made. If the property owner shall fail to comply with the directive, water
service shall be discontinued until such time as the location reaches compliance,
but in no event shall water supply to fire hydrant(s) be discontinued. The Public
Utilities Director may proceed with the necessary repairs utilizing Department
personnel or other authorized independent contractors, if determined in the
best interest of public health, safety, and welfare. The property owner shall be
billed for the work and labor performed and materials and equipment
furnished. In the event that the property owner fails to pay said bills or
expenses within 30 days from the date the same are mailed to the owner, then
such bills shall be entered in the municipal lien docket as a lien owing the City
and the same may be turned over to the city solicitor for collection.
72 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 127
City of Dover Public Utilities Department www.dover.de.us
iv. The City Manager and his/her authorized agents shall have the authority to
enter any premises within the City or service territory at reasonable times to
inspect, repair or replacement wastewater utility infrastructure or to make
necessary and reasonable tests consistent with good engineering practice to
determine condition or to determine if any violations of this Handbook or City
Code exist.
v. The Public Utilities Department shall be responsible for the operations of all
wastewater utility facilities to ensure that all local, state and federal laws and
requirements are met.
In the event maintenance activities, repairs, replacements or upgrades
are determined necessary to dedicated facilities in order to meet the
requirements noted above, such activities shall be completed within the
time frame required.
When such activities are required of undedicated facilities, the property
owner shall perform such activities as directed by the Public Utilities
Department within the time frame required at his/her expense. If the
property owner shall fail to comply with the directive, all response shall
occur in accordance with Section VI.B.1.iii.
vi. No trees may be planted within ten feet (10’) of wastewater utility
infrastructure.
vii. No structures, including permanent signage, may be located within ten feet
(10’) of wastewater utility infrastructure.
viii. Wastewater lines may not be located near any potential source of
contamination.
2. Repairs and Replacement
i. Public Utilities Department Responsibilities
The Public Utilities Department will repair all wastewater utility
infrastructure, including sanitary sewer gravity lines, force mains,
manholes and pumping stations, dedicated to the City of Dover
whenever breaks or other failures are identified.
The Public Utilities Department will repair sanitary sewer laterals
between the main and the cleanout (when installed within one foot (1’)
of the right-of-way or easement line as per requirements), whenever
breaks or other failures are identified. In the event a cleanout is not
available, the property owner is responsible for installing said cleanout
73 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 128
City of Dover Public Utilities Department www.dover.de.us
as required by this Handbook. Once the cleanout has been installed,
the location of any failures or defects can then be identified.
The Public Utilities Department reserves the right to charge any party
responsible for damage to wastewater utility infrastructure for labor,
equipment, materials and other expenses incurred due to the repair of
such facilities.
The Public Utilities Department will replace wastewater utility
infrastructure dedicated to the City of Dover only when determined
appropriate by the City.
ii. Property Owner Responsibilities
The property owner shall repair all undedicated wastewater utility
infrastructure, including but not limited to sanitary sewer gravity lines,
force mains, manholes, sanitary sewer laterals, cleanouts, grease traps
and pumping stations whenever breaks or other failures are identified
at his/her expense. Inspections shall be performed by a Public Utilities
representative in accordance with all requirements of this Handbook.
All cleanouts are the full responsibility of the property owner. All said
facilities, including fixtures and other attachments furnished by the
customer or property owner on the property, shall be maintained in
good order and condition. The City shall in no event be responsible for
maintaining any portion of the wastewater utility infrastructure owned
by the customer (infrastructure located outside of the right-of-way or
easement), or for damage done by or penalties resulting from
wastewater escaping there from.
The property owner shall have seventy-two (72) hours to complete all
non-critical repairs. All critical repairs shall be initiated within two (2)
hours. If the Public Utilities Department is aware of an issue, notice
shall be provided at the property directly to either the property owner
or customer. If the property owner shall fail to comply with the
directive, all response shall occur in accordance with Section VI.B.1.iii.
The property owner shall be responsible for the replacement and
maintenance of undedicated wastewater utility infrastructure at his/her
expense. All replacement activities shall meet the requirements of this
Handbook including plan development.
74 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 129
City of Dover Public Utilities Department www.dover.de.us
3. Maintenance
i. Public Utilities Department Responsibilities
The Public Utilities Department shall clean and maintain all sanitary
sewer gravity lines, manholes and pumping stations dedicated to the
City of Dover (see also Sanitary Sewer Main Jetting Program) on a
regular basis to ensure a functioning wastewater system.
The Public Utilities Department shall video inspect all sanitary sewer
gravity lines and manholes dedicated to the City of Dover on a regular
basis to analyze pipe and manhole condition.
ii. Property Owner Responsibilities
The property owner shall clean and maintain all undedicated
wastewater utility infrastructure, including but not limited to sanitary
sewer gravity lines, manholes, sanitary sewer laterals, cleanouts, grease
traps and pumping stations on a regular basis to ensure a functioning
wastewater system at his/her expense.
All dedicated / undedicated sanitary sewer gravity lines shall be cleaned
and maintained to the point of connection to the City of Dover sanitary
sewer main line. Any blockage occurring in a dedicated / undedicated
sanitary sewer gravity main or lateral, to the point of connection at the
main, shall be the sole responsibility of the property owner unless a
blockage is found within the City of Dover sanitary sewer main line.
All sanitary sewer laterals shall be cleaned and maintained from the
structure receiving wastewater service to the point of connection to the
City of Dover sanitary sewer main line by the property owner. The
property owner is responsible for ensuring adequate cleanouts are
located on the lateral, including one (1) cleanout one foot (1’) outside
the right-of-way or easement line as per this Handbook, to allow for
proper maintenance in conformance with the requirements of this
Handbook. Any blockage occurring in a sanitary sewer lateral, to the
point of connection at the sewer main, shall be the sole responsibility of
the property owner unless a blockage is found within the City of Dover
sanitary sewer main line.
In the event repairs are required to the sanitary sewer lateral within the
right-of-way or easement, the Public Utilities Department shall perform
such repairs only after obtaining first hand evidence that the problem is
located within the right-of-way and that the problem requires repair or
75 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 130
City of Dover Public Utilities Department www.dover.de.us
replacement of the lateral. This shall ensure that the City road or right-
of-way is restored properly.
4. Sanitary Sewer Main Jetting Program
i. Sanitary sewer main jetting is performed on a regular basis as a critical part of
normal system maintenance. The goal of this program is to remove debris,
grease and other deposits to ensure a functioning wastewater system.
ii. Sanitary sewer mains are typically sized to allow adequate conveyance of peak
flow conditions. Flow occurring under non-peak conditions can move through
the mains at lower velocities resulting in material deposits and build up in pipes.
The buildup can restrict flow in pipes and if not removed can contribute to line
blockages.
iii. The Public Utilities Department utilizes a jetting truck at manholes throughout
the system to perform the Sanitary Sewer Main Jetting Program. The jet truck
sends water through the main at a high velocity, creating a scouring action,
which removes build up within the lines.
iv. All sanitary sewer main jetting operations shall be scheduled by the Water /
Wastewater Manager to ensure the wastewater system is optimally maintained
based upon current practices.
v. Sanitary sewer main jetting shall be performed on all dedicated sanitary sewer
mains on a regular basis.
5. Wastewater Meters
i. Wastewater meters shall be permitted only with approval from the Public
Utilities Director.
ii. Design calculations, installation and site plans must be submitted to the Water /
Wastewater Manager for review and approval prior to receiving final approval
from the Public Utilities Director.
iii. All wastewater meters shall be installed outside in a pit or vault as appropriate.
All wastewater meters, regardless of location, shall be accessible to the Public
Utilities Department at all times for inspection. All meters shall have a
minimum clear area around the meter of three feet long by three feet wide by
six feet high (3’L x 3’W x 6’H) for accessibility purposes. Existing non-pit meters
shall not be blocked from access by walls, equipment or any other materials.
iv. The property owner shall be responsible for maintaining, repairing and replacing
individual wastewater meters at his/her expense. Certificates of calibration,
76 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 131
City of Dover Public Utilities Department www.dover.de.us
meeting NIST (National Institute of Standards and Technologies) requirements,
shall be submitted to the Water / Wastewater Manager annually.
v. The City of Dover reserves the right to discontinue direct read wastewater
billing service in the event the property owner is not properly maintaining the
wastewater meters.
6. Prohibited Discharges
i. It shall be unlawful for any person or group of persons to throw, place, or
deposit, or attempt to throw, place or deposit, or cause to be thrown, placed or
deposited, any article, object or substance into any wastewater utility
infrastructure, which object, or substance would injure, damage or curtail flow
in any manner in said wastewater system or pumping station into which
wastewater utility infrastructure empties.
ii. It shall be unlawful to pour, drain or run into the wastewater utility
infrastructure of the City, by any method whatsoever, any tar or tar product, or
petroleum or petroleum product, or any flammable substance or material.
iii. It shall be unlawful to pour or drain into or permit the drainage into the
wastewater utility infrastructure of the City any substance or chemical which
would damage the machinery or equipment, or hinder the proper functioning or
flow of the wastewater system or of pumping stations, owned and operated by
the City.
iv. Prohibited discharges shall include that contained within Part II, Chapter 180,
Article III, Section 180-10 of the Code of Kent County, as revised. This Code
requires that “No person shall discharge or cause to be discharged any
stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted
industrial process waters to any sanitary sewer”. This shall include condensate
as Section 98-161 of the City of Dover Code defines storm sewer as “…any
system used for conveying rain water, stormwater, surface water, condensate,
cooling water or similar liquid wastes, exclusive of sewage”.
v. Trucks carrying sanitary sewer waste may discharge into the sanitary sewer
system, in accordance with this Section, only upon approval by the Public
Utilities Director or Water / Wastewater Manager. Requests shall be submitted
in writing and reviewed on a case by case basis. All waste proposed to be
discharged must have been generated by a customer of the City of Dover
Wastewater System and meet all requirements of this section.
77 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 132
City of Dover Public Utilities Department www.dover.de.us
7. Concerns and Problems
i. Customers may contact the Public Utilities Department during the normal
working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, excluding
holidays, at 302-736-7070 with any questions or concerns regarding the City of
Dover Wastewater Utility.
ii. Customers may contact the Public Utilities Department System Operations at
302-736-7060 or 302-736-7086 (twenty-four (24) hours a day, seven (7) days a
week) with any problems or emergencies relating to the City of Dover
Wastewater Utility.
C. Customer Services
1. Application for Service
i. In order to receive water and/or wastewater service, each customer is required
to apply at the Customer Service Department and if approved the customer
shall enter into a contract with the City for water and/or wastewater service, as
appropriate for the location, which is subject to the terms of service. Any prior
outstanding debts to the City of Dover will result in service not being granted
until the debt is paid in full.
ii. When requesting service, individuals need to complete an application for utility
service at least twenty four (24) hours or one (1) business day before the
requested service date. The City requires a signed lease agreement or proof of
ownership, a Social Security card, and one form of photo identification. The City
will obtain credit reports to determine the amount of a deposit, if required.
Charges for water and/or wastewater service, as applicable for the account,
shall begin at the time service is made available to the customer.
iii. The application form must be completed and approved to engage in a contract
for service. This Handbook and any Rules and Regulations adopted by the City
shall be part of every contract for water and/or wastewater service.
iv. The City Manager is empowered to create and enforce all rules and regulations
in order to maintain and operate the City’s water and wastewater systems. The
City Manager, or designee, is authorized to review every contract for water
and/or wastewater service. Additional information regarding policies and
regulations may be obtained by contacting the City of Dover’s Customer Service
Department.
v. The City may reject any application for service if the applicant does not meet all
the requirements of the City.
78 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 133
City of Dover Public Utilities Department www.dover.de.us
vi. The City does not charge a service fee to establish or discontinue service.
However, the City reserves the right to charge a service fee to process changes
or cancelations to any type of work order requests. An individual requesting to
establish service without providing the required notice shall be subject to a
service fee according to the published connect and disconnect service fees.
vii. The City may require a service deposit for all utility (electric, water and/or
wastewater) accounts. This amount varies depending on the customer’s credit
rating. The requested deposit can be as much as three times the average
monthly bill at the residence in question or as little as zero. Service deposits are
held in an interest bearing account. Interest is paid on the deposit at a rate set
by the City Council. When the customer account is terminated the deposit will
be applied to the final bill. Any credit remaining on the account after the final
bill is satisfied will be refunded to the customer once it has been determined
that the customer has no other outstanding balances with the City of Dover.
viii. As long as a residential customer (owner or renter) maintains a good credit
standing, they will never be asked for an additional deposit. A customer who
fails to pay their bill and has services disconnected or who has a returned check,
and either occurs twice in a twelve month period, will be charged an additional
deposit. Additional deposits may be required for any reason the City may deem
appropriate.
2. Transference, Discontinuance and Suspension of Service
i. When requesting a service transfer, individuals must apply at Customer Service
and complete an application for utility service. A signed lease document or
proof of ownership, a Social Security card, and one form of photo identification
is required.
ii. Establishment of water and/or wastewater service to a customer at a new
location or transference of water and/or wastewater service to a new location
shall be rendered only when all City of Dover outstanding debts are paid in full.
Any delinquent balance must be paid in full and the account must be brought
current in order to have service established at another location. At this time,
the deposit for both locations will be reviewed. Any deposits will be transferred
and an additional deposit may be required. The final bill is due and payable
when rendered.
iii. The customer shall give the City at least (1) business day, or twenty-four (24)
hours, written notice to discontinue water and/or wastewater service unless
otherwise agreed upon and shall be liable for water and/or wastewater service
79 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 134
City of Dover Public Utilities Department www.dover.de.us
used, as applicable for the account, until the meter is disconnected or final
reading is recorded.
iv. If, by reason of any act, neglect or default of a customer, the City’s water and/or
wastewater service is suspended or the City is prevented from supplying water
and/or wastewater service in accordance with the terms of any water and/or
wastewater service contract it shall have entered into, the minimum charge for
the unexpired portion of the water and/or wastewater service contract term
shall become due and payable immediately as liquidated damages in lieu of the
anticipated returns from the water and/or wastewater contract.
v. Regular meter readings shall be made monthly for all customers, by City
personnel, during normal working hours. Failure to have meter accessible for
this purpose could result in termination of service.
vi. Water and/or wastewater service may be disconnected by the City pursuant to
this Handbook and shall be reconnected only upon advance payment of
published service fees in addition to all arrearage due under the customer's
utility service contract.
There will be no charge for turning on or off any service for
maintenance or repair purposes if done during normal working hours.
Service calls after normal working hours are subject to charges at the
rate approved by City Council.
Prior to turning on any service discontinued for nonpayment, a service
charge at the rate approved by City Council must be paid, together with
all current and overdue charges.
vii. The City reserves the right to discontinue water and/or wastewater service
without notice for the following reasons:
For shortages or interruptions in the City’s source of water supply or in
other cases of emergency such as the performance of repairs as
referenced in VI.A.1., VI.A.2., IV.B.1. and IV.B.2.
Whenever an unsafe condition, or condition that may affect public
health, safety and welfare, is found to exist on the customer’s premise
that is related to or would be affected by water and/or wastewater
service. (For example, if a site is discharging wastewater from the site
due to a sewer backup or other cause the City may turn off water
service to the site to prevent further wastewater discharge from the site
in the interest of public health, safety and welfare until the necessary
repairs are performed.)
80 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 135
City of Dover Public Utilities Department www.dover.de.us
viii. The City may discontinue water and/or wastewater service to a customer with
notice upon a determination by the City Manager, or designee, that the Notice
of Termination is correct or that the customer has waived his right to dispute
the Notice of Termination for the following reasons:
Failure to repair conditions having a detrimental effect on the City’s
water and/or wastewater service or public health, safety and welfare as
referenced in VI.A.1., VI.A.2., IV.B.1. and IV.B.2.
Violation or noncompliance with this Water / Wastewater Handbook
and/or Federal, State, or Local rules and regulations.
Nonpayment of water / wastewater bill upon a determination by the
City Manager, or designee, following the regulation as adopted by the
City which may follow the guidelines as adopted by the Public Service
Commission of the State of Delaware.
3. Water and Wastewater Rates, Tariffs and Charges
i. Copies of the Water and Wastewater Rates, Tariffs and all rules and regulations
adopted by City Council are available for the public review at the Customer
Service Center, Public Utilities Department, City Clerk’s office and on the City of
Dover website. The rules and regulations apply to every customer or applicant
for utility service. Revisions and amendments may occur from time to time, and
customers are encouraged to contact the City for updates.
ii. The failure by the City of Dover to enforce any of the provisions of the Tariffs
shall not be deemed a waiver of its right to do so.
4. Billing
i. Deduction meters, for irrigation or any other purpose, are not permitted.
ii. All water service connections must be metered. The water meter will be utilized
to generate both water and wastewater usage. A separate meter may be
utilized for irrigation purposes which will not generate a wastewater billing. All
meter planning questions should be directed to the Public Utilities Department.
iii. Meter readings are obtained by the City’s meter reading staff on a monthly
basis on a pre-determined route. The area of the service address determines
the date the meter is read, billed and due and requests for a specific billing date
cannot be accommodated. The water and/or wastewater bill, as applicable for
the account, shall be due and payable within twenty-one (21) days after the
water and/or wastewater bill is dated.
81 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 136
City of Dover Public Utilities Department www.dover.de.us
iv. When the City’s meter reader is, at any regular meter reading date unable to
gain access to the customer’s premises the City may render an estimated utility
bill based on prior usage.
v. When terminating services, the customer must make a request to the City one
(1) business day, or twenty-four (24) hours, prior to the termination date. The
final bill will be due and payable when rendered. Any service deposit on file will
be applied to the final bill. If unpaid, the City may refer the account to a
collection agency. The customer will be responsible for any fees, penalties, legal
expenses and attorney fees incurred during the collection process.
vi. The City Manager, or his/her authorized agents, are hereby authorized to
discontinue the water supply to any premises for nonpayment of water and/or
wastewater service fees, as applicable to the account, thirty-six (36) days after a
statement of the amount due shall have been mailed to the owner or occupant
of the premises. The overdue water and/or wastewater service fees shall be
entered in the municipal lien docket as a lien against property owned by the
chargeable.
vii. When demands are reassessed as the result of an investigation made at the
customer's request or by routine inspection when it is found that the customer
has been miss-billed for any reason, the City has the option to render corrected
bills to the customer. The corrections will begin with the month when it is
established the error occurred, but will not exceed twelve (12) billings.
viii. A billing adjustment will be made when a water meter is tested and found to be
in excess of five percent (5%) fast / slow.
A meter that tests fast – the City will either credit or refund the
customer any amount equal to the excess Tgal (thousand gallons) usage,
for water and/or wastewater, as applicable for the account, for a period
not to exceed the three (3) previous monthly billing periods unless the
time at which the error first developed or occurred can be definitively
identified. In this case, the estimated Tgals overcharged will be based
on that date but will in no case be retroactive beyond a twelve (12)
month period.
For a meter that tests slow – the customer may be charged any amount
equal to the under-registered Tgal (thousand gallons) usage, for water
and/or wastewater as applicable for the account, for a period not to
exceed the three (3) previous monthly billing periods unless the time at
which the error first developed or occurred can be definitively
identified. In this case, the estimated Tgals under-charged will be based
82 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 137
City of Dover Public Utilities Department www.dover.de.us
on that date but will in no case be retroactive beyond a twelve (12)
month period.
ix. A billing adjustment will be made for stopped water meters, jammed registers
or non-functioning water meters. The customer’s consumption for water
and/or wastewater, as applicable for the account, will be estimated based on
the customer’s usage during similar periods. The estimate will cover only the
period subsequent to the last recorded meter consumption.
x. Sewer (wastewater) meters are permitted to the benefit of the customer and as
such the appropriate function and calibration of the meter is the responsibility
of the customer. Should it be determined that the sewer meter is
malfunctioning or cannot be read for any other reason the wastewater bill will
either be estimated based upon the customer’s usage during similar periods or
be based upon the water meter reading as most appropriate for the subject
location as deemed appropriate by the Public Utilities Department and
Customer Service Department.
xi. A billing adjustment for water and/or wastewater, as applicable for the account,
will be made when water meter tampering and/or theft of service occurs. The
usage will be based on the recorded registration of the meter if it is determined
that all illegal usage went through the meter. If the usage was not recorded
through the meter, the usage will be estimated based on the consumption
during similar periods. In cases that only part of the usage passed through the
meter, both metered and estimated usages will be used to calculate the total
consumption.
5. Payments
i. To better serve our customers the City of Dover offers a variety of payment
options. Cash, checks, money orders, cashier’s check, certified checks, credit
cards, and bank drafting are some accepted forms of payment. Payments can
be mailed, brought to the office during normal business hours (8:30 AM to 5:00
PM, Monday through Friday), or placed in the drop box located at Customer
Service. Cash payments cannot be accepted in the drop box. For complete
details on payment options, please contact Customer Services.
ii. It is important to maintain a good payment record. Payment is due (21) twenty-
one days from the billing date indicated on the bill. Before disconnecting water
and/or wastewater service for nonpayment, a disconnection notice shall be
mailed to the customer giving an additional (14) days to make the payment or
make arrangements with Customer Service, if the customer meets eligibility
83 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 138
City of Dover Public Utilities Department www.dover.de.us
requirements. Delinquent balances are subject to penalties at the percentage
approved by City Council. More details on the City’s credit policy are available
by contacting Customer Service.
iii. All property owners shall be responsible for the fees for water and/or
wastewater service, as applicable, on their property and shall not be relieved of
the payment of water and/or wastewater service fees because of any
agreement between themselves and any tenants in possession. Should a tenant
become in arrears for water and/or wastewater service, as applicable for the
account, the property owner is ultimately responsible for the payment of the
water and/or wastewater bills for the property. Due to this obligation, the
property owner may call the Customer Service Department to determine if any
water and/or wastewater account for the subject property is in arrears.
iv. The City will charge an established service fee for any check or electronic funds
transfer returned unpaid for any reason from the bank. In the event the item
returned was used for the payment of reconnection of water and/or
wastewater service the City may terminate the water and/or wastewater
service, without written notice, until the matter is resolved. All returned check
payments must be made in cash, credit card or money order at Customer
Service, during normal business hours. If the returned check resulted in water
and/or wastewater service interruption, an additional service fee will apply. To
be reconnected after hours contact the City of Dover Public Utilities Dispatch
Center. Only money orders or cashier’s checks will be accepted.
v. An equalized payment plan will be permitted for residential customers, property
owners only, meeting the requirements. Monthly payments for the service
address will be based on the estimated cost of total consumption for the eleven
month period October through August, with additional billing being made in the
remaining one (1) month. Adjustments in monthly payments may be made
after each quarterly review, and may indicate that the original estimate
consumption was too high or too low. Additional information can be obtained
by contacting Customer Service.
6. Tampering
i. Tampering with the infrastructure, appurtenances or equipment of the water
and wastewater systems of the City of Dover Public Utilities Department is
prohibited.
ii. It is unlawful for any person to tamper or interfere with the City’s water meter.
It is unlawful for any person, except a duly authorized representative of the City,
84 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 139
City of Dover Public Utilities Department www.dover.de.us
to make any modifications to the City’s meter. The City is not liable for any
injury or damage as a result of unlawful activity.
iii. In the event that the City's water meters or other property are tampered or
interfered with, the customer receiving service through that equipment shall
pay the amount which the City estimates is due for water and/or wastewater
service, but not registered on the City's water meter, for any repairs or
replacements required, and for changes in the customer's installation that the
City may require.
iv. The City may file Criminal or Civil charges against the responsible party and the
customer is subject to arrest for tampering and/or theft of service. Before the
service can be restored, all repairs must be made with inspections obtained (if
necessary) and full payment for all monies owed the City must be made,
including any additional security deposits that may be required. In cases where
it cannot be determined who was being supplied, the owner of the property
may be held responsible for the tampering/theft.
85 Water/Wastewater Handbook Effective Date: ?/??/2010
Page 140
Appendix A: Water / Wastewater Initial Plan
Submission Checklist
Page 141
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
WATER / WASTEWATER INITIAL PLAN SUBMISSION CHECKLIST
This form is intended for use by the owner, developer or design consultant for Renovation to Existing Building or
Developed Site projects, Site Development projects or Subdivision projects. This form must be submitted with all initial
plan submissions. An authorized representative of the owner / developer shall fill out this form in its entirety (including
the checklist which starts on Page A2) and sign the certification statement below. If an item is not required as part of the
project scope please note Not Applicable in the appropriate project description column. If a particular design aspect is
not currently complete, but will be provided in the check print phase, please note Check Print in the appropriate project
description column (typically pertains to DAC projects). Public Utilities Department personnel will review this form and all
attachments. Review comments and/or approval will be provided under separate cover.
PROJECT NAME: _____________________________________ SUBMISSION DATE: _________ CODPU #: _______
(Provided by City of Dover)
DESCRIPTION OF PROJECT: ______________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
OWNER/DEVELOPER/APPLICANT INFORMATION CONSULTANT INFORMATION
Name (Company) Name (Company)
Contact Person / Title Contact Person / Title
Mailing Address Mailing Address
City, State, Zip City, State, Zip
Telephone / FAX Telephone / FAX
E-mail Address E-mail Address
I hereby certify that to the best of my knowledge the attached plans meet all City of Dover Public Utilities Department
standards and specifications including all applicable local, state and federal requirements.
_____________________________________ _____________________________________ _________________
Printed Name of Authorized Representative Signature of Authorized Representative Date
Page 142
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT WATER / WASTEWATER INITIAL PLAN SUBMISSION CHECKLIST
PROJECT NAME: ______________________________________________________________________________
Site Public Utilities
Item Renovation Subdivision
Development Comments
Sheet dimensions shall be no larger than twenty-
four (24) by thirty-six (36) inches.
Plan sheet scale shall be no smaller than 1” = 60’.
Index sheet scale shall be no smaller than 1” =
200’. (Index sheet provided whenever two (2) or
more sheets are used to illustrate the plan view.)
Location map at a scale of 1” = 400’.
Title block.
Plan date and all revisions dates.
North arrow, scale, datum and benchmark.
Name and address of owner, developer (if
applicable) and engineer or surveyor.
Seal and license number of the professional
engineer or surveyor including a certification as to
the accuracy of the plan and survey.
Property lines of abutting land including property
address and name of owner.
Existing and proposed boundaries of the property
including easements and rights-of-way.
Existing and proposed contours at intervals of one
foot or less as well as significant existing features
including finish floor elevations.
A seven and one-half feet (7.5’) wide public utility
easement provided along all side lot lines.
A fifteen feet (15’) wide public utility easement
provided along all rear lot lines.
A ten feet (10’) wide public utility easement
provided along all front lot lines.
All water and wastewater mains not located in the
right-of-way located within five feet (5’) of the
center of a twenty feet (20’) wide public utility
easement.
A master phasing plan provided for all projects to
be constructed in phases. Phasing plan reflected
throughout the plan set.
Page A2
Page 143
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT WATER / WASTEWATER INITIAL PLAN SUBMISSION CHECKLIST
PROJECT NAME: ______________________________________________________________________________
Site Public Utilities
Item Renovation Subdivision
Development Comments
The size, type and location of all existing and
proposed water mains, service lines, valves, fire
hydrants and other appurtenances shown.
The size, length, slope, type, flow direction and
location of all existing and proposed sanitary sewer
mains and laterals shown. The size, type and
location of all existing and proposed sanitary
structures (including manholes, cleanouts, and
pumping stations) shown. Rim and invert
elevations labeled on all sanitary structures.
Profiles of all sanitary sewer mains provided. All
water, sanitary sewer and storm sewer crossings,
including services, shown.
The proposed location of grease traps, if
applicable, provided on the plans. A construction
detail for the structure proposed provided.
A materials listing table for all proposed water and
wastewater utility infrastructure provided.
Utility schedules for all wastewater utility
infrastructure and storm water infrastructure
provided on the construction plans.
A public infrastructure dedication table listing all
proposed water and wastewater utility
infrastructure, storm water infrastructure, streets
and alleys to be dedicated to the City of Dover
provided on the construction plans.
Standard Water / Wastewater notes provided.
Sizing calculations for all water mains provided
including design capacities.
Sizing calculations for all water service lines greater
than one-inch (1”) provided.
Water usage projections (average and peak flows
and plumbing fixture data) for domestic use and
irrigation provided. (Irrigation only must be
submitted for single-family dwellings.)
Page A3
Page 144
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT WATER / WASTEWATER INITIAL PLAN SUBMISSION CHECKLIST
PROJECT NAME: ______________________________________________________________________________
Site Public Utilities
Item Renovation Subdivision
Development Comments
Sizing (flow) calculations provided for all sanitary
sewer mains showing that velocity, design
capacities and all other requirements are met. Any
projected future flow requirements must be clearly
identified.
Sizing (flow) calculations provided for all sanitary
sewer laterals showing that velocity and all other
requirements are met. (Must be submitted for all
uses other than single-family dwellings.)
Hydraulic system analysis provided for each
pumping station including force mains. Calculation
of the system-head curves and the use of these
curves in conjunction with the characteristic curves
of available pumps included. Criteria provided in
C.1.ii. for average and peak flow used to determine
the influent peak flow.
Pumping station site requirements provided
including: power requirements and panels, one-
inch (1”) water service as per standard details,
security/work light with photo eye and manual
override, flush mount safety equipment for wet
well access, steps/ladder within wet well to extend
to normal wastewater level, four-inch (4”) bypass
pump hook-up with valves, flow meter / chart
recorder (to be located in pit with bypass and
associated valving), sump pump and electrical
hook-up in flow meter pit with manual switch, pole
and antenna for RTU, paved driveway, fencing with
twelve feet (12’) double gate along perimeter of
site, and stone covering of entire site.
Standard water details provided.
Standard wastewater details provided.
Page A4
Page 145
Appendix B: Water / Wastewater Final Plan
Submission Checklist
Page 146
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
WATER / WASTEWATER FINAL PLAN SUBMISSION CHECKLIST
This form is intended for use by the owner, developer or design consultant for Renovation to Existing Building or
Developed Site projects, Site Development projects or Subdivision projects. This form must be submitted with all final
plan submissions. An authorized representative of the owner / developer shall fill out this form in its entirety (including
the checklist which starts on Page B2) and sign the certification statement below. If an item is not required as part of the
project scope please note Not Applicable in the appropriate project description column. Public Utilities Department
personnel will review this form and all attachments. Review comments and/or approval will be provided under separate
cover.
PROJECT NAME: _____________________________________ SUBMISSION DATE: _________ CODPU #: _______
(Provided by City of Dover)
DESCRIPTION OF PROJECT: ______________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
OWNER/DEVELOPER/APPLICANT INFORMATION CONSULTANT INFORMATION
Name (Company) Name (Company)
Contact Person / Title Contact Person / Title
Mailing Address Mailing Address
City, State, Zip City, State, Zip
Telephone / FAX Telephone / FAX
E-mail Address E-mail Address
I hereby certify that to the best of my knowledge the attached plans meet all City of Dover Public Utilities Department
standards and specifications including all applicable local, state and federal requirements.
_____________________________________ _____________________________________ _________________
Printed Name of Authorized Representative Signature of Authorized Representative Date
Page 147
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT WATER / WASTEWATER FINAL PLAN SUBMISSION CHECKLIST
PROJECT NAME: ______________________________________________________________________________
Site Public Utilities
Item Renovation Subdivision
Development Comments
Four complete sets plans. Signed by owner and
signed and sealed by either a Delaware licensed
Professional Engineer or Delaware licensed
Professional Land Surveyor as per Delaware State
Code.
Digital copy of the plans compatible with AutoCAD
in addition to all current City of Dover GIS
requirements and digital copy of the plans in .pdf
format.
Public Utilities Department meter sizing /
verification completed.
State of Delaware Health and Social Services,
Division of Public Health, Office of Drinking Water
Plan Approval received (water).
State of Delaware Department of Natural
Resources and Environmental Control (DNREC),
Division of Water Resources, Surface Water
Discharges Section Plan Approval received
(wastewater).
State of Delaware Department of Transportation
Plan Approval received with copy attached.
Kent Conservation District Sediment and
Stormwater Plan Approval received with copy
attached.
Page B2
Page 148
Appendix C: Water / Wastewater Pre-Construction
Meeting Checklist
Page 149
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
WATER / WASTEWATER PRE-CONSTRUCTION MEETING CHECKLIST
This form is intended for use by the developers or contractors constructing water or sewer facilities within the City of Dover service area. An authorized representative of
the developer shall fill out this form in its entirety (including the checklist on Page C2 and all associated forms) and sign the certification statement below. If an item is
not required as part of the project scope please note Not Applicable in the appropriate project description column. Public Utilities Department personnel will review this
form and all attachments. Review comments and/or approval will be provided under separate cover.
PROJECT NAME: _________________________________________ SUBMISSION DATE: ____________ SUBMITTAL #: ______ CODPU PROJECT #: ___________
(Provided by City of Dover)
DEVELOPER INFORMATION CONTRACTOR INFORMATION SUPPLIER INFORMATION
Name of Developer (Company) Name of Contractor (Company) Name of Supplier (Company)
Contact Person Contact Person Contact Person
Mailing Address Mailing Address Mailing Address
City, State, Zip City, State, Zip City, State, Zip
Telephone Telephone Telephone
FAX FAX FAX
E-Mail Address E-Mail Address E-Mail Address
I hereby certify that the specific products indicated within the attached Acceptable Materials Checklists represent a true list of materials to be used within the project indicated above, and I
acknowledge understanding of the requirements that follow. Any and all specified requirements detailed in the Water / Wastewater Handbook shall apply to all materials proposed for use
on this project. When the notation “Full Specifications Required” or similar language appears within the attached Acceptable Materials Checklists, or when required materials do not appear
within said lists, complete shop drawings submittals are required. All materials supplied to the job site shall conform in all ways to the requirements of the Water / Wastewater Handbook.
_____________________________________________ _____________________________________________ __________________ ____________________
Printed Name of Developer or Contractor Representative Signature of Developer or Contractor Representative Date Telephone
Page 150
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT WATER / WASTEWATER PRE-CONSTRUCTION MEETING CHECKLIST
PROJECT NAME: __________________________________________________________________________________ SUBMITTAL #: _________________
Item Renovation Site Development Subdivision Public Utilities Comments
Construction Schedule
List of Subcontractors including contact information
Completed DelDOT Utility Construction Permit Application including 8-
1/2” x 11” drawing
Completed Acceptable Water Materials Checklist (Appendix E)
Completed Acceptable Wastewater Materials Checklist (Appendix F)
Completed Acceptable Wet Well Mounted Pump Station Materials
Checklist (Appendix G)
Completed Acceptable Recessed Wet Well Mounted Pump Station
Materials Checklist (Appendix H)
Shop Drawing Submittals for Approval
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
Page C2
Page 151
Appendix D: Acceptable Water Materials Checklist
Page 152
x
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
ACCEPTABLE WATER MATERIALS CHECKLIST
This form is intended for use by the developers or contractors constructing water facilities within the City of Dover service area. An authorized representative of the
developer shall fill out this form in its entirety and submit it in conjunction with the Water / Wastewater Pre-Construction Meeting Checklist. Please check a single
selection box per item for materials to be used in conjunction with the project. If an item is not required as part of the project scope please note Not Applicable in the
Comments section. Please contact the Public Utilities Department if part numbers or models indicated are no longer available.
PROJECT NAME: _________________________________________ SUBMISSION DATE: ____________ SUBMITTAL #: ______ CODPU PROJECT #: ___________
(Provided by City of Dover)
Item Description Manufacturer Selection Comments
Compression Connector Adapter
ANSI/AWWA C800, I.P.T. to CTS O.D.tubing Mueller 110 Compression Adapter o
Corporation Stop
ground key corporation valve, ANSI/AWWA C800, inlet - 1"; Mueller, H-15008 o
AWWA taper (Mueller cc) thread, outlet - Mueller 110
conductive compression connection for CTS O.D.
tubing
Corporation Stop
Ori-Corp corporation valve, ANSI/AWWA C800, inlet - 1-1/4" to 2"; Mueller, H-15013 o
AWWA taper (Mueller cc) thread, outlet - Mueller 110
conductive compression connection for CTS O.D.
tubing
Curb Stop Valve
ANSI/AWWA C800 1" to 2", Mueller Oriseal, H-10291 F.I.P. o
(requires Mueller 110 compression
connectors adapters to connect to CTS
tubing)
Page 153
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE WATER MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Fire Hydrants
AWWA C502 and UL236, 5-1/4" opening, 200 psi Darling Co. B-62-B Breakaway o
rating, 2-1/2" hose nozzles (2 ea.), 4-1/2" pumper
nozzle (1 ea.), caps and operating nut shall have the
"DOVER SPECIAL" taper
Fittings
ductile iron, full body, 350 psi rating, ANSI/AWWA American Pipe o
A21.10/C110 U.S. Pipe o
Tyler Union o
Other (Full Specifications Required) o
Gate Valves
resilient wedge, epoxy coated, 250 psi rating, domestic Mueller (A-2360) o
manufactured IAW ANSI/AWWA C509 / C515, NSF 61 AFC 2500 series o
Certified (right hand valves)
Kennedy 8571 o
Other (Full Specifications Required) o
Retainer Glands
manufactured of high strength ductile iron conforming Tyler Union o
to the requirements of ASTM A536, Grade 65-45-12; US Pipe o
wedging mechanisms shall be manufactured of ductile
EBBA Iron o
iron, heat treated to a hardness of 370 BHN minimum;
dimensions of the gland shall be conforming to the
Other (Full Specifications Required) o
requirements of ANSI/AWWA A21.11/C111 and
ANSI/AWWA A21.53/C153; the mechanical joint
restraining device shall have a water working pressure
rating of 350 psi minimum (in sizes 4" thru 16") with a
safety factor of at least 2:1
Page D2
Page 154
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE WATER MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Service Valve (Curb) Box
cast iron, ASTM A-48/AASHTO H20 wheel load, Tyler Union 6500, Cast Iron Screw Type o
domestic manufactured W/WATER lid
Street Valve Box
cast iron, three piece, 5-1/4" shaft, screw type, Tyler Union (6860 3-piece, #6 Base) o
domestic manufactured Other (Full Specifications Required) o
Tapping Sleeve
Type 304 (18-8) stainless steel per AWWA C115, Powerseal 3490AS o
Fabrications: Type 304 (18-8) Stainless Steel per ASTM
A240, Bolts & Nuts: Type 304 (18-8) Stainless Steel per
ASTM A193 and A194 for sleeves with stainless steel
flange.
Tapping Valve
resilient wedge, epoxy coated, 250 psi rating, domestic Mueller (A-2360T) o
manufactured IAW ANSI/AWWA C509 / C515, NSF 61 AFC 2500 series o
Certified
Kennedy 8572 o
Other (Full Specifications Required) o
Tracer Wire and Detector Tape
tracer wire shall be a minimum of 12 gauge blue Calpico Type 1 o
coated solid copper wire; detector tape Empire Level o
(warning/identification tape) shall be non-detectable,
Proline Safety o
6" wide, colored blue, with continuous warning
Other (Full Specifications Required) o
"CAUTION: BURIED WATER LINE BELOW."
Water Mains
ductile iron, cement lined, Tyton joint, Class 52, U.S. Pipe o
domestic manufactured IAW ANSI/AWWA A21.5/C151, Atlantic States o
A21.4/C104
Tyler Union o
Other (Full Specifications Required) o
Page D3
Page 155
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE WATER MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Water Service
type 'K' copper tubing coils, 1" to 2", ASTM B88, SPECIFY DOMESTIC SUPPLIER o
minimum 1"
Water Service
SDR9 (poly tubing), permitted for use instead of 2" SPECIFY DOMESTIC SUPPLIER o
copper
Page D4
Page 156
Appendix E: Acceptable Wastewater Materials
Checklist
Page 157
x
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
ACCEPTABLE WASTEWATER MATERIALS CHECKLIST
This form is intended for use by the developers or contractors constructing wastewater facilities within the City of Dover service area. An authorized representative of the
developer shall fill out this form in its entirety and submit it in conjunction with the Water / Wastewater Pre-Construction Meeting Checklist. Please check a single selection
box per item for materials to be used in conjunction with the project. If an item is not required as part of the project scope please note Not Applicable in the Comments
section. Please contact the Public Utilities Department if part numbers or models indicated are no longer available.
PROJECT NAME: _________________________________________ S UBMISSION DATE: ____________ SUBMITTAL #: ______ CODPU PROJECT #: ___________
(Provided by City of Dover)
Item Description Manufacturer Selection Comments
Casing End Seal
1/4" thick styrene butadiene rubber sheet end seal, Advance Products & Systems o
use 1" wide stainless steel bands, zippered end seals Pipeline Seal & Insulator o
with stainless steel bands may also be used
Powerseal o
Other (Full Specifications Required) o
Casing Spacer
stainless steel casing spacer center restrained position Advance Products & Systems o
type with PVC liner and non-metallic anti-friction Pipeline Seal & Insulator o
runners
Powerseal o
Other (Full Specifications Required) o
Cleanout Frame and Cover
10" nominal diameter cast iron frame and cover per East Jordan Iron Works, #00156601 o
ASTM A48, Class 30; cover: 14 lbs; frame: 39 lbs; Other (Full Specifications Required) o
marked with "S"
Coupling, Flexible
made of an elastomeric compound that meets the Calder o
requirements of ASTM D5926, C1173 and applicable DFW/HPI o
portions of ASTM C443 / C425 / C564 / CSA B602 / Fernco o
D1869; leak-proof, root-proof and are resistant to
Other (Full Specifications Required) o
chemicals, ultraviolet rays, fungus growth, and normal
sewer gases; stainless steel clamps are corrosion-
resistant and rust-proof
Page 158
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE WASTEWATER MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Damp-Proofing
Kop-Coat Bitumastic Super Service Black o
Other (Full Specifications Required) o
Fittings, PVC
gasketed sewer fittings, wall thickness SDR 35/26, Certainteed o
ASTM D-3034.D1784 / D3212 / F-477 Harco o
J-M Pipe o
Other (Full Specifications Required) o
Liner System
felt or fiberglass liner system for lining of precast No Manufacturer Specified o
manholes and sewer pipe (Full Specifications Required)
Manhole Frame and Cover
31-1/2" nominal diameter cast iron frame and cover East Jordan Iron Works, #00196012 o
per ASTM A48, Class 30, with machined seats; inner (frame), #00196029 (cover)
cover: 152 lbs; frame: 165 lbs; marked with "CITY OF Other (Full Specifications Required)
o
DOVER"
Manhole Frame and Cover, Hinged / Locking
31-1/2" nominal diameter cast iron frame and cover East Jordan Iron Works, #NCR08-1856F1 o
per ASTM A536, Class 30, with machined seats and Other (Full Specifications Required) o
bronze lock lugs; hinge to have 120 degree opening
radius; marked with "CITY OF DOVER"
Manhole Frame and Cover, Locking
31-1/2" nominal diameter cast iron frame and cover East Jordan Iron Works, #NCR08-1856C o
per ASTM A48, Class 30, with machined seats and Other (Full Specifications Required) o
bronze lock lugs; inner cover: 152 lbs; frame: 165 lbs;
marked with "CITY OF DOVER"
Manhole Joint Sealant Compound
pre-formed, rubber gasket to form a watertight seal A-Lok o
between manhole sections, ASTM C443 D-Lok o
Other (Full Specifications Required) o
Page E2
Page 159
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE WASTEWATER MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Manhole Pipe Connector (Existing Precast and Non-Precast Manholes)
provides a flexible, watertight, environmentally safe Press-Boot o
joint that exceeds ASTM C923 specifications; (breaking Kor-N-Seal o
into existing manholes) Other (Full Specifications Required) o
Manhole Pipe Connector (Precast Manholes)
rubber flexible type connector for pipe to manhole A-Lok X-Cell o
connection for precast manholes meeting ASTM C443 Z lok o
Other (Full Specifications Required) o
Manhole, Precast Concrete
access manholes for sewer mains; cones, risers, and Atlantic Concrete Products o
bases designed for H-20 highway loading ASTM C478; Gillespie Precast o
exterior coating finish: 2 coats of Koppers bitumastic Other (Full Specifications Required) o
300M water epoxy at 8.0-mil dry thickness (200 SFPG)
per coat
Pipe, Ductile Iron
cement lined, Tyton joint, Class 50, 51, or 52; domestic American Pipe o
manufactured; IAW ANSI/AWWA A21.5/C151, Atlantic States o
A21.4/C104; for use on wastewater gravity and force U.S. Pipe
o
mains
Tyler Union o
Other (Full Specifications Required) o
Pipe, PVC
for sewers between 6" and 15", ASTM D 3034, SDR 35 Diamond Plastics o
and SDR 26 sewer pipe Certainteed o
Johns-Manville o
Other (Full Specifications Required) o
Rock, Crushed
Delaware 57 stone used for bedding sewer lines DELDOT Approved (Provide Source) o
(Full Specifications Required)
Page E3
Page 160
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE WASTEWATER MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Service Saddle
6" minimum, used for connecting new sewer lateral to GENECO o
existing sanitary sewer mains, Sealtite Sewer stainless Other (Full Specifications Required) o
steel, Sealtite as manufactured by GENECO
Tracer Wire and Detector Tape
tracer wire shall be a minimum of 12 gauge green Calpico Type 1 o
coated solid copper wire; detector tape Empire Level o
(warning/identification tape) shall be non-detectable,
Proline Safety o
6" wide, colored green, with continuous warning
Other (Full Specifications Required) o
"CAUTION: BURIED SEWER LINE BELOW."
Page E4
Page 161
Appendix F: Acceptable Wet Well/Dry Well Pump
Station Materials Checklist
Page 162
x
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
ACCEPTABLE WET WELL/DRY WELL PUMP STATION MATERIALS CHECKLIST
This form is intended for use by the developers or contractors constructing wet well/dry well pump stations within the City of Dover service area. An authorized representative
of the developer shall fill out this form in its entirety and submit it in conjunction with the Water / Wastewater Pre-Construction Meeting Checklist. Please note that all
selections under each item are required. Please contact the Public Utilities Department if components indicated are no longer available.
PROJECT NAME: _________________________________________ SUBMISSION DATE: ____________ SUBMITTAL #: ______ CODPU PROJECT #: ___________
(Provided by City of Dover)
Item Description Manufacturer Selection Comments
Cabinet
NEMA 4X cabinet, (Hoffman UU1008030 4X Enclosure) Hoffman (Full Specifications Required) o
36"H x 30"W x 11"D with communications/power Other (Full Specifications Required) o
interface panel and heater
Chart Recorder
Single Pen Chart Recorder (Honeywell DR4500 Trueline Honeywell o
12" Circular Chart Recorder) or Multipen Chart Recorder Other (Full Specifications Required) o
(Honeywell DPR100 Multipen Strip Chart Recorder)
Flow Meter
located in pit with bypass and associated valving; Siemens o
Siemens Flowmeter Mag 5100W Nema 6P and Siemens
Convertor Mag 6000
Pump Station
pump station specifications shall include the following: Smith & Loveless o
General (IV.D.2.ii) (Full Specifications Required)
Pumps and Valves (IV.D.2.iii) Other (Full Specifications Required) o
Electrical and Emergency Power Supply (IV.D.2.iv)
Metering and Controls (IV.D.2.vi)
- unless otherwise specified
Wet Well/Dry Well Stations (IV.D.2.vii)
Page 163
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE WET WELL/DRY WELL PUMP STATION MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Radio
MDS 9710, 900 mHz SCADA radio; battery charger with Microwave Data Systems o
12V, 7AH battery (Full Specifications Required)
Remote Telemetry Unit (RTU)
TG5700 RTU TEKEGYR 5700; RTU specifications shall SIEMENS o
include the following as per IV.D.2.v: (Full Specifications Required)
Station Manager
Combination Controller Card
General Requirements
Safety Equipment
flush mount for wet and dry well access; DBI Sala flush DBI Sala o
floor mounted sleeve c/w pins for fresh concrete, mild
steel (Model #8510311); and DBI Sala sleeve cap, heavy
duty, zinc plated, mild steel (Model #8510826)
Security/Work Light
with photo eye and manual override; Hubbell Miniliter Hubbell o
IV (Catalog #MHS-Y150S-568-1); Hubbell Slipfitter Other (Full Specifications Required) o
(Catalog #4024C); and Hubbell Pole (Catalog #SSS-10-40-
1-XX-XX)
Page F2
Page 164
Appendix G: Acceptable Vacuum Primed
Pump Station Materials
Checklist
Page 165
x
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
ACCEPTABLE VACUUM PRIMED PUMP STATION MATERIALS CHECKLIST
This form is intended for use by the developers or contractors constructing vacuum primed pump stations within the City of Dover service area. An authorized
representative of the developer shall fill out this form in its entirety and submit it in conjunction with the Water / Wastewater Pre-Construction Meeting Checklist. Please
note that all selections under each item are required. Please contact the Public Utilities Department if components indicated are no longer available.
PROJECT NAME: _________________________________________ S UBMISSION DATE: ____________ SUBMITTAL #: ______ CODPU PROJECT #: ___________
(Provided by City of Dover)
Item Description Manufacturer Selection Comments
Cabinet
NEMA 4X cabinet, (Hoffman UU1008030 4X Enclosure) Hoffman (Full Specifications Required) o
36"H x 30"W x 11"D with communications/power Other (Full Specifications Required) o
interface panel and heater
Chart Recorder
Single Pen Chart Recorder (Honeywell DR4500 Trueline Honeywell o
12" Circular Chart Recorder) or Multipen Chart Other (Full Specifications Required) o
Recorder (Honeywell DPR100 Multipen Strip Chart
Recorder)
Flow Meter
located in pit with bypass and associated valving; Siemens o
Siemens Flowmeter Mag 5100W Nema 6P and Siemens
Convertor Mag 6000
Pump Station
pump station specifications shall include the following: Smith & Loveless o
General (IV.D.2.ii) (Full Specifications Required)
Pumps and Valves (IV.D.2.iii) Other (Full Specifications Required) o
Electrical and Emergency Power Supply (IV.D.2.iv)
Metering and Controls (IV.D.2.vi)
- unless otherwise specified
Vacuum Primed Stations (IV.D.2.viii)
Page 166
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT ACCEPTABLE VACUUM PRIMED PUMP STATION MATERIALS CHECKLIST
PROJECT NAME: __________________________________________________________________________________ S UBMITTAL #: _________________
Item Description Manufacturer Selection Comments
Radio
MDS 9710, 900 mHz SCADA radio; battery charger with Microwave Data Systems o
12V, 7AH battery (Full Specifications Required)
Remote Telemetry Unit (RTU)
TG5700 RTU TEKEGYR 5700; RTU specifications shall SIEMENS o
include the following as per IV.D.2.v: (Full Specifications Required)
Station Manager
Combination Controller Card
General Requirements
Safety Equipment
flush mount for wet and dry well access; DBI Sala flush DBI Sala o
floor mounted sleeve c/w pins for fresh concrete, mild
steel (Model #8510311); and DBI Sala sleeve cap, heavy
duty, zinc plated, mild steel (Model #8510826)
Security/Work Light
with photo eye and manual override; Hubbell Miniliter Hubbell o
IV (Catalog #MHS-Y150S-568-1); Hubbell Slipfitter Other (Full Specifications Required) o
(Catalog #4024C); and Hubbell Pole (Catalog #SSS-10-
40-1-XX-XX)
Page G2
Page 167
Appendix H: Standard Details
Table of Contents
Water Details
W-1 Residential Water Service & Meter Pit Installation
W-2 Valve Box-Screw Type
W-3 Fire Hydrant & Valve Box Detail
W-4 Fire Hydrant & Valve Box Detail without Curb and Gutter
W-5 2” Blow-Off Assembly for Water Mains
W-6 Buttresses for Water Mains
W-7 Domestic and Fire Service Connection
W-8 Fire Main Pipe Restraint
Wastewater Details
WW-1 Residential Sewer Lateral Depth up to 8’
WW-2 Residential Deep Sewer Lateral Depth Greater than 8’
WW-3 Manhole Type I
WW-4 Manhole Type II
WW-5 Manhole Type III
WW-6 Manhole Type Plan View
WW-7 Flow Channel Patterns
WW-8 Manhole Steps
WW-9 Sanitary Sewer Cleanout Detail
WW-10 Manhole Frame
WW-11 Manhole Cover
WW-12 Manhole Cover Locking
WW-13 Hinged Manhole
WW-14 Cast Iron Saddle for 6” Building Sewer Connection
WW-15 Trench Pavement Width
WW-16 Special Bedding and Embedment for PVC Sanitary Sewer Pipe
WW-17 Special Bedding for Ductile Iron Pipe
WW-18 Directional Drill Detail
WW-19 Casing Installation
WW-20 Outside Drop Manhole Type A & B
WW-21 Reliner Inside Drop System Manhole Detail (5’ Diameter)
WW-22 Force Main Discharge Manhole Detail
WW-23 2” Air Release Valve Assembly
WW-24 Combination Sewage Air Release/Vacuum Relief Valve and Manhole
Detail-Paved/Traffic Areas
WW-25 Combination Sewage Air Release/Vacuum Relief Valve and Manhole
Detail-Grass/Non-Traffic Areas
WW-26 Emergency Pumping Connection Detail
WW-27 Sanitary Sewage Pumping Station Electric and Water Service
WW-28 Standard Sanitary Sewer Marker
Water / Wastewater Details
WWW-1 Utility Conflict Relocation Detail
Page 186
R
We "Cover the Infrastructure"
Page 205
Appendix I: Operation and Maintenance Exhibits
Table of Contents
OM-1 Typical Water Service Repair and Replacement Responsibilities
OM-2 Typical Sanitary Sewer Lateral Repair and Replacement Responsibilities
OM-3 Typical Sanitary Sewer Maintenance Responsibilities
Page 209
CITY OF DOVER PUBLIC UTILITIES DEPARTMENT
WATER / WASTEWATER HANDBOOK
EXECUTIVE SUMMARY
BACKGROUND
The City of Dover Public Utilities Department identified a need for an up to date document that
outlined the standards and requirements of the water and wastewater utilities and associated
infrastructure. To this point the water and wastewater utilities have been governed by the City of
Dover Code of Ordinances, the Department of Public Works Specifications, Kent County Code of
Ordinances, the Code of the State of Delaware (particularly through DNREC and the Office of Drinking
Water), federal requirements, AWWA and Ten States Standards, and past Department of Public
Works and Public Utilities Department policies and practices. Although it was never the intent to
duplicate codes or standards it was considered critical to streamline the key standards, specifications,
requirements and practices associated with the City of Dover water and wastewater utilities. As a
result, the City of Dover Public Utilities Department Water / Wastewater Handbook was developed.
GOALS and FRAMEWORK
The primary goal of the handbook was to develop a single, “user-friendly” document that would be
useful to not only City of Dover staff but also property owners, customers, developers, consultants
and contractors. In order to do this, the handbook was divided into the following sections:
INTRODUCTION AND CONTACT INFORMATION: This section provides an overview of the City
of Dover’s water and wastewater utilities. In addition, a table containing contact information
for various Departments and services that may be useful when working with the utility on
various issues, as well as a summary of staff’s expertise is included to explain whom to contact
for the various issues that may arise is provided.
DEFINITIONS: This section provides the definitions of key terms used within the document.
PROCESS OUTLINE: This section provides an overview of projects that would require review
by the Public Utilities Department and the process involved. A table is included to help clarify
the process, Departments involved and associated time frames.
PLAN REQUIREMENTS: This section provides the detailed requirements of plans submitted for
review. In addition, the Water / Wastewater Initial Plan Submission Checklist and Water /
Wastewater Final Plan Submission Checklist have been provided in Appendices A and B
respectively to help expedite the process.
DESIGN AND INSTALLATION STANDARDS: This section provides the specific design,
infrastructure and installation standards required for the City of Dover’s water and
wastewater utilities. Additional applicable codes, standards and regulations are also listed for
reference. In addition, the Acceptable Water Materials Checklist, the Acceptable Wastewater
Materials Checklist, the Acceptable Wet Well / Dry Well Pump Station Materials Checklist and
the Acceptable Vacuum Primed Pump Station Materials Checklist have been provided in
Appendices D, E, F and G respectively to help streamline and clarify the requirements.
February 8, 2010 Page 1
Page 210
Standard Details have been provided in Appendix H for use in plan submissions and to clarify
the requirements.
CONSTRUCTION PHASE: This section provides the specific requirements for the pre-
construction meeting, water and wastewater utility inspections, and request for public
infrastructure acceptance and dedication. The Water / Wastewater Pre-Construction Meeting
Checklist has been provided in Appendix C to assist in the startup of construction projects.
OPERATIONS AND MAINTENANCE: This section provides City of Dover and property owner
responsibilities regarding maintenance, repairs and replacement of public and private utilities
and services. In order to clarify these responsibilities the Operations and Maintenance
Exhibits in Appendix I have been provided. In addition, the section provides information on
key water and wastewater utility programs and service related components such as water
distribution system flushing, fire hydrant flow testing, sanitary sewer main jetting, fire hydrant
operation, water and wastewater meters, backflow prevention, prohibited discharges to the
wastewater system and Customer Services Department issues.
CHANGES OR UPDATES TO CURRENT PRACTICE
While developing the handbook, staff identified various areas that required additional clarification in
order to aide one, or a number of parties, that may refer to the handbook for information. In
addition, some changes or updates to current practice were also identified; primarily to assist in
maintaining uniformity of practice throughout the handbook, to address concerns or issues that have
occurred in the past or to ensure that best interests of the water and wastewater systems are
maintained. A summary of the changes or updates is provided below, including those proposed to
the City of Dover Code of Ordinances.
WATER / WASTEWATER HANDBOOK
Renovations to existing buildings or developed sites is now included under applicable projects
requiring approval. All projects which will be changing the character of the existing water
and/or wastewater service must bring it up to current standards and specifications.
A provision has been made for administrative waivers and plan approval extensions.
A pre-application meeting with the Public Utilities Department is recommended prior to plan
submission.
An EDU is defined as 250 gpd, which is consistent with Kent County.
A minimum clearance of eighteen-inches (18”) is required between all water / wastewater
lines and all drains, electric lines, gas mains and all other utilities.
All manhole frames and covers for new installations shall be of the hinged, locking variety.
Video inspections of sanitary sewer mains are required within three (3) months of request for
public infrastructure acceptance.
Tracer wire and identification tape verification is required within three (3) months of request
for public infrastructure acceptance.
Each water service line from the main to a property or principle structure shall be metered by
a single water meter to control the entire domestic supply.
February 8, 2010 Page 2
Page 211
All water meters shall be installed outside.
The City reserves the right to relocate a water meter from inside a facility to outside a facility.
All water meters registered with the City of Dover shall become the property of the City once
water service is established.
The Public Utilities Department is responsible for routinely testing water meters.
The property owner must submit certificates of calibration annually for wastewater meters.
When a wastewater meter is not functioning, estimates from similar periods or the water
meter reading will be used as deemed appropriate for the location.
The property owner must initiate critical repairs to undedicated water or wastewater
infrastructure within two (2) hours.
The property owner is responsible for testing, maintenance, repair and replacement of all
backflow prevention devices.
As maintenance, repair and replacement of undedicated mains is the responsibility of the
property owner; it is clarified that this includes water system flushing. The City may charge
for this service.
Fire suppression system testing is to be scheduled with the City and water usage data
submitted.
CITY OF DOVER CODE OF ORDINANCES
CHAPTER 110 – UTILITIES, ARTICLE III – WATER SERVICE: Incorporated the handbook by
reference and consolidated the code. Sections of the code were moved to the handbook.
CHAPTER 110 – UTILITIES, ARTICLE IV – SANITARY SEWER SERVICE: Incorporated the
handbook by reference and consolidated the code. Sections of the code were moved to the
handbook. An EDU is defined as 250 gpd.
CHAPTER 98 – STREETS, SIDEWALKS, STORM SEWERS AND OTHER PUBLIC PLACES: Moved
storm sewer related sections from Chapter 110 to Chapter 98.
APPENDIX F FEES AND FINES: Service charge increase from $35.00 to $50.00.
SUMMARY
The Public Utilities Department has develop a single, “user-friendly” document to assist in conveying
standards and specifications related to the City of Dover’s water and wastewater utilities. Having this
information in one location will make communication and implementation simpler for all involved
parties.
It is expected that this will be a “living” document and reviewed on a regular basis to ensure it is kept
up to date with current practices and that any suggestions for improvement are analyzed. When
deemed necessary, the appropriate Committees and Council will be presented the necessary
modifications for consideration before the policies are implemented.
Staff will continue to work with the Customer Service, Planning & Zoning and Public Services
Departments moving forward to ensure the interests of the water and wastewater utilities and
stakeholders are met.
February 8, 2010 Page 3
Page 212
EXHIBIT #3
Regular Council Meeting of 03/08/2010
Amendment to Lease – 5 Dated 8/30/85
New Section 3: Use of Premise. The premises shall be used by Tenant
exclusively for the purpose of handling its charitable business and for
no other purpose than such charitable business is known and
established as of the date of this lease. No part of the premises shall be
sublet, nor shall this Lease be assigned without prior written consent of
the Landlord, unless Tenant chooses to assign the Lease and or sublet
to a partner agency (another 501(c) (3) organization) that is aligned
with carrying out Tenants mission to maximize the community
resources to improve the quality of life for all Delawareans.
New Section 6f. That Tenant will not assign this lease nor sublet the
premises or any part thereof without first obtaining consent of the
Landlord, unless Tenant chooses to assign the Lease and or sublet to a
partner agency (another 501(c) (3) organization) that is aligned with
carrying out Tenants mission to maximize the community resources to
improve the quality of life for all Delawareans.
Page 213
EXHIBIT #4
Regular Council Meeting of 03/08/2010
LETTER IN OPPOSITION OF HOUSE BILL #194
March XX, 2010
Name
Address
City
Dear Legislator,
We are writing to express strong opposition to the addition of new gambling venues in the state of Delaware, as
proposed by House Bill #194. As civic leaders in the City of Dover, we urge you to reject the proposal, as it would
be detrimental not only to Kent County, but to Delaware as a whole.
Expanding the number of Delaware gaming venues would negatively impact employees at all three racinos in our
state and only serve to cut the same size pie into smaller pieces. In essence, it would dilute an already watered-down
revenue stream for the state, while harming the long-term viability of the existing racinos and the establishments that
rely on them. The overall quality of life in the greater Dover community would surely suffer as a result of Bill #194.
Most alarmingly, the legislation could create serious financial damage to Dover International Speedway and Casino,
one of not only the city’s biggest employers, but also one of the largest organizations in Kent County. The addition
of new venues would only exacerbate the financial difficulties Dover International Speedway and Casino and other
local businesses currently face; potentially forcing them to close shop, trim operations or move elsewhere. Passing
HB #194 could also lead to the reduction of contributions by the Mid-Del Charitable Foundation, which supports
many important Delaware organizations and activities.
As elected officials of the City of Dover, we passionately oppose HB #194. The addition of new gambling venues
would not just impact the Dover area businesses negatively; the entire state of Delaware would suffer as a result of
this proposed Bill. These new gaming facilities represent a short-sighted stop gap measure and do not provide the
long-term strategy required to solve Delaware’s budgetary issues. With more gaming facilities, the market as we
know it will become oversaturated and lead to diminished returns for everyone involved. This Bill stands to benefit
no one.
The Business leaders of Dover, your constituents, do not support this bill.
Thank you for your time and careful consideration of these issues.
Respectfully, Respectfully,
Carleton E. Carey, Sr. Beverly C. Williams
Mayor Council President