Page 1
REGULAR COUNCIL MEETING
AGENDA
April 12, 2010 - 7:30 P.M. - Council Chambers - City Hall - City of Dover
OPEN FORUM - 15 MINUTES PRIOR TO OFFICIAL MEETING (7:15 P.M.)
INVOCATION BY CHAPLAIN WALLACE DIXON
PLEDGE OF ALLEGIANCE
AGENDA ADDITIONS/DELETIONS
* CONSENT AGENDA
Those items on the Council Agenda which are considered routine and non-controversial shall be marked
with an asterisk (*) and will be acted upon by a single roll call vote of the Council. There will be no
separate discussion of these items unless a member of Council so requests, in which event the matter shall
be removed from the Consent Agenda and considered a separate item.
* 1. Adoption of Minutes - Regular Council Meeting of March 22, 2010
2. Certificate of Appreciation - Friends of the Library
3. Certificate of Recognition and Congratulations - Richard Hudson - September 1989 -
March 2010
4. Proclamations
A. Duke Ellington Month
B. National Library Week
C. Scots-Irish Month
5. Public Hearing - Violation of the Dangerous Building Ordinance - 225 North Bradford
Street (D & S Investments CO, LLP)
6. Rescheduling of Public Hearing/Final Reading - Rezoning
Property located on the south side of White Oak Road, 1,340+/- feet west of Long Point
Road, owned by TLFD Management, LLC. The property, consisting of 12.73+/- acres, is
currently zoned R-20 (One Family Residence) subject to SWPOZ (Source Water
Protection Overlay Zone) and the proposed zoning is R-8 (One Family Residence) subject
to SWPOZ (Source Water Protection Overlay Zone). The First Reading of Proposed
Ordinance #2010-04 was accomplished during the Council Meeting of February 22, 2010.
This item was tabled by the Planning Commission on March 15, 2010. It is recommended
that the Public Hearing be Rescheduled for Monday, May 24, 2010 at 7:30 p.m.
Page 2
Council Agenda
April 12, 2010 Page 2
7. Public Hearing/Final Reading - Rezoning
Property located at 1051 College Road, owned by Lands of JNK, LLC, consisting of
4.32+/- acres, less a street right-of-way area consisting of 0.55+/- acres that divides the
original tract into two (2) pieces. These properties are currently zoned R-8 (One-family
Residence) and the proposed zoning is RG-2 (General Residence). The First Reading of
Proposed Ordinance #2009-29 was accomplished during the Council Meeting of
November 23, 2009. Due to inclement weather, the Planning Commission was unable to
consider this item on December 21, 2009. On January 19, 2010, this item was tabled by the
Planning Commission until March 15, 2010, and on February 22, 2010, the Public
Hearing/Final Reading before City Council was rescheduled for April 12, 2010 at 7:30 p.m.
* 8. Utility Committee Report - March 22, 2010
A. Extension of Recycling Contract and Option for the Future
(Committee Recommended Authorizing the City Manager to Execute the Addendum for
Curbside Recycling with the Delaware Solid Waste Authority, with the Terms Outlined in
the Agreement)
B. Review of Utility Related CIP’s (Electric and Water/Wastewater)
(Committee Recommended Acceptance of the Report)
C. FY 2011 Five-Year Capital Investment Plan (CIP)
(Committee Recommended Acceptance of the FY 2011 Five-Year Capital Investment Plan
(CIP) Report)
* 9. Legislative, Finance, and Administration Committee Report - March 22, 2010
A. Review and Recommendation - Filling Critical Positions
(Committee Action Not Required)
B. Presentation - Summary of Pay for Performance (PFP) Employee Meetings
(Committee Recommended that this Matter Be Tabled until the next Legislative, Finance,
and Administration Committee Meeting and that the Chair Do His Best to Assure this is
an Agenda Item to Allow for Discussion at that Time)
C. Latest Estimate (LE) for Fiscal Year 2010 Budget
(Committee Action Not Required)
D. Presentation - Comprehensive Annual Financial Report (CAFR) - Fiscal Year Ended
June 30, 2009
(Deferred by Committee Due to Time Constraints)
E. FY 2011 Five-Year Capital Investment Plan (CIP)
(Deferred by Committee Due to Time Constraints)
* 10. Special Parks, Recreation, and Community Enhancement Committee Report -
March 24, 2010
A. Community Development Block Grant (CDBG) Application Review
(Committee Recommended Approval of the Distribution of the CDBG Grant Monies Based
on the Scoring of the Grant Applications Conducted by the Committee)
Page 3
Council Agenda
April 12, 2010 Page 3
11. Safety Advisory and Transportation Committee Report - March 24, 2010
A. Truck Route Traffic: West of Dover through Bicentennial Village
(Committee Recommended Approval of the Actions Presented by Staff and Requested Staff
to Provide an Update During the April 12, 2010 City Council Meeting)
* B. FY 2011 Five-Year Capital Investment Plan (CIP)
(Committee Recommended Acceptance of the Report)
* C. Update on Wyoming Mill Road Project (Gary Laing)
(Committee Action Not Required)
* D. Discussion - Concerns Related to New Traffic Light on Route 13 (at Gena’s Steaks
and Kirby & Holloway Crossover)
(Committee Action Not Required)
* 12. Monthly Reports - February 2010
A. Budget Report
B. Chief of Police Report
C. City Assessor Report
D. City Manager’s Report
E. City Planner’s Report
* 13. Appointment of Judges - Robbins Hose Company Special Election - April 19, 2010
A. John Hurd
B. Jack Mitchell
C. Nancy Auten (Alternate)
14. Final Reading - Proposed Ordinance #2010-05
The First Reading of Proposed Ordinance #2010-05 was accomplished during the
Council Meeting of March 22, 2010. Copies of the proposed ordinances are available
at the entrance of the Council Chambers.
A. PROPOSED ORDINANCE #2010-05 AMENDING CHAPTER 2 - ADMINISTRATION ,
ARTICLE VI - OTHER POST-EMPLOYMENT BENEFITS FUND , SECTION 2-505 -
MEDICARE PART B PREMIUM REIMBURSEMENTS
15. Council Members Announcements
/tm
S:\PACKETS\2010\Council\04-12-2010\04-12-2010.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 4
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on March 22, 2010 at 7:30 p.m. with
Council President Williams presiding. Council members present were Mr. Leary, Mrs. Russell,
Mr. McGlumphy, Mr. McGiffin, Mr. Hogan, Mr. Salters, and Mr. Ruane. Mr. Slavin was absent.
Council staff members present were Police Chief Horvath, Ms. Russell, Mrs. Mitchell,
Mrs. Townshend, Fire Chief Christiansen, Mr. DePrima, City Solicitor Rodriguez, and
Mrs. McDowell. Mayor Carey was also present.
OPEN FORUM
The Open Forum was held at 7:16 p.m., prior to commencement of the Official Council Meeting.
Council President Williams declared the Open Forum in session and reminded those present that
Council is not in official session and cannot take formal action.
Mrs. Sara Herbert, 223 N. Bradford Street, serving as spokesperson for several neighbors in
attendance, relayed their concern regarding the deterioration of the community due to irresponsible
landlords. She distributed pictures (as on file in the Office of the City Clerk) and read a statement
into the record (Exhibit #1).
Ms. Patricia Patterson, 218 N. State Street, stated that the trash pile at 225 N. Bradford Street can
be viewed from her residence and is higher than her height. She advised members that there are
dilapidated lawn mowers chained to a tree that are under the trash pile. She requested that the City
take action to remedy this problem, which she stated has been ongoing for more than six (6) years.
Council President Williams assured the residents that the appropriate staff members would be
contacting them to address the issues.
The invocation was given by Chaplain Dixon, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. McGiffin moved for approval of the agenda as presented, seconded by Mr. McGlumphy
and unanimously carried.
Mr. McGlumphy moved for approval of the consent agenda, seconded by Mr. Leary and
carried by a unanimous roll call vote (Mr. Slavin absent).
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF MARCH 8, 2010
The Minutes of the Regular Council Meeting of March 8, 2010 were unanimously approved
by motion of Mr. McGlumphy, seconded by Mr. Slavin and bore the written approval of
Mayor Carey.
PROCLAMATION - LIGHTS OUT DELAWARE - EARTH HOUR
The City Clerk read the following Proclamation into the record:
WHEREAS, our nation's use of energy continues to increase, resulting in detrimental effects on the
world's climate; and
Page 5
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 2
WHEREAS, it has been estimated that turning non-essential lights out in America for one hour could
save as much as 15% of the energy consumed on an average Saturday night; and
WHEREAS, the energy savings will reduce carbon emissions into our air, preserve the natural
resources used to produce this energy, set a positive precedent for the rest of the nation, and result
in ongoing reduced costs for the taxpayers and businesses of the City of Dover; and
WHEREAS, participation in Lights Out America - Earth Hour will provide the residents of the City
of Dover with insight into the impact of light pollution and allow them to witness firsthand the
benefits of regulating outdoor lighting.
NOW THEREFORE I, CARLETON E. CAREY, SR., MAYOR OF THE CITY OF DOVER,
DELAWARE support the recognition of LIGHTS OUT AMERICA - EARTH HOUR on
March 27, 2010, by recommending that the residents and businesses of the City of Dover participate
by turning out non-essential lights from 8:30 p.m. to 9:30 p.m.
Mayor Carey presented the Proclamation to Mr. Ron Zink, of the Sierra Club, in appreciation for
their efforts to conserve energy. Mr. Zink relayed appreciation for the recognition and support of
their efforts.
ANNOUNCEMENT BY MAYOR CAREY - RETIREMENT OF POLICE CHIEF
JEFFREY HORVATH
Mayor Carey announced that he received a letter of retirement from Police Chief Jeffrey Horvath
after 26 years of service to the City of Dover, having served as Police Chief for the past nine (9)
years. He commended Chief Horvath for his outstanding service to the community and outstanding
leadership in moving the Police Department forward. He stated that it was with mixed emotions that
he accepted Chief Horvath’s letter of retirement to become effective April 3, 2010.
Mayor Carey introduced Major James Hosfelt, who has been employed with the City of Dover Police
Department for 21 years, and who will assume the position of Police Chief. He announced that there
would be a Change of Command Ceremony on April 1, 2010.
Police Chief Horvath stated that nine (9) years ago, when he was appointed Police Chief by
Mayor Hutchison, he was advised that one of the Police Chief’s most important responsibilities was
to put the proper people in place to take charge when he retired. He assured members that he has
accomplished that task and that Major Hosfelt will serve the City well as Police Chief. He thanked
everyone for all the support provided to the Police Department and relayed appreciation for the
dedication of the Mayor, Council, City Solicitor, and City staff. He indicated that it has been his
pleasure and honor to work for the City of Dover.
Major Hosfelt thanked the Mayor for the support provided in his appointment as Police Chief. He
stated that he has had the pleasure of working under the leadership of Chief Horvath for the past
22 years and looks forward to working with the City and his extended family, which are the members
of the Dover Police Department, in this new capacity.
Page 6
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 3
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE REPORT -
MARCH 8, 2010
The Parks, Recreation, and Community Enhancement Committee met on March 8, 2010 with
Chairwoman Russell presiding.
PRESENTATIONS
Beautification Partnership Project - Dover Housing Authority and Habitat for Humanity
Ms. Jocelyn McBride, Executive Director of the Central Delaware Habitat for Humanity, provided
members with an information sheet (attached to Committee minutes) detailing a “1-2-3 = ABC
Community Event” being sponsored by the Dover Housing Authority and the Central Delaware
Habitat for Humanity, with the support of Senator Carper’s office and Wesley College.
Ms. McBride explained that the proposed project is a one-day community clean-up scheduled for
August 21, 2010 from 8:00 a.m. to 3:00 p.m. and will focus on improving curb appeal and
streetscape in a 20-block area of Downtown Dover, from West Street to Governors Avenue between
Mary and Loockerman Streets. She stated that over 400 volunteers will be involved, including a
large number of Wesley College freshmen who will participate as part of their student orientation.
She explained that a group of volunteers will be assigned to each street to perform trash pick-up,
raking, and curb painting. In addition, homeowners in the target area will be given an opportunity
to submit applications to have minor home repairs completed free of charge. Each group working
on homes will have a skilled maintenance person present to supervise repairs. She noted that
donations will be solicited for materials and supplies. Ms. McBride mentioned that the downtown
area will be promoted during this event, and merchants in the area will be given an opportunity to
sponsor beautification projects and provide discount coupons to participants. Ms. McBride
requested support from the City in identifying and assessing properties to be targeted, assisting with
permitting, providing trash pick-up service, allowing access to fire hydrants to be used in pressure
washing homes, providing police presence as needed, and assisting with other event-related needs.
Mr. William Neaton, Economic Development Director and Director of the Downtown Dover
Partnership, stated that he applauded the efforts of the organizers and fully endorses the project.
Mr. Ruane suggested that the project planning team contact Ms. Pamela Sapco, Executive Director
of the Delaware Center for Horticulture, who administers a State-wide program that includes
development of horticultural projects such as community gardens, public landscapes, and tree
programs, for a possible tie-in with this event.
In response to Mr. Lewis, Ms. McBride noted that Wesley College has volunteered their athletic
fields as the primary location for volunteers to congregate.
Responding to Mrs. Russell, Ms. McBride indicated that income level will not be considered when
evaluating home repair applications, although information will be collected regarding how many
people are in each household and how many families are being served.
Ms. Ami Sebastian-Hauer, Executive Director of Dover Housing Authority, noted that a kickoff for
the event is being planned for the middle of April and applications will be received from
May 1, 2010 through June 1, 2010.
Page 7
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 4
Mr. Anthony DePrima, City Manager, stated his support for the project and indicated that the City
would definitely like to participate. He commended the Dover Housing Authority and the Habitat
for Humanity for collaborating on the joint undertaking. Mr. DePrima stated that accessing fire
hydrants would be difficult to arrange because of potential problems with the water system. He
suggested that a City of Dover representative be appointed to the event planning committee to serve
as a point of contact.
Ms. Sebastian-Hauer noted Wesley College’s support in the form of contributing T-shirts, supplies,
volunteers, and the use of athletic fields.
The Committee recommended acceptance of the report and that the City of Dover provide support
for the event in every way possible.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
Overview of Salvation Army Programs
Captain Jeny Shurtleff, Salvation Army Corps Commander, reviewed a presentation regarding the
Salvation Army (attachment to Committee minutes). The presentation included information on the
history of the organization, the extent of the Salvation Army’s influence, both nationally and
internationally, and the structure of the organization. She mentioned features that make the
organization unique, including its spiritual and social service functions, its emphasis on music, the
publications that the organization produces, and its quasi-military format. She noted that the
Salvation Army in Dover provides a number of community services including spiritual services and
a variety of youth programs, including after-school programs for Booker T. Washington, Central
Middle School, and William Henry students. She noted that staff includes a full-time caseworker
who assists with crisis alleviation, resume writing, and personal budgeting, and a part-time cook who
prepares food for the soup kitchen and for youth in the afterschool program. She added that the
organization participates in a kettle drive, which begins with an annual kick-off at City Hall during
the Christmas season and is supplemented with a Christmas in July drive. Captain Shurtleff stated
that she and her husband have been directing the program in Dover since July of 2008 and have been
working since then to improve the exterior and interior of the building. An open house was held
recently to showcase improvements made to the facility and volunteers were recognized. She
emphasized that there are always opportunities for volunteers in the organization, specifically in the
soup kitchen, assisting with the kettle drive, and working with children.
In response to Mr. Ruane, Captain Shurtleff noted that approximately 50 individuals are fed on days
when the soup kitchen is in operation.
In response to Mr. DePrima, Captain Shurtleff explained that Mr. Walter Bagley serves on the Board
of Directors for Dover Interfaith Mission for Housing and the Salvation Army Council and is,
therefore, in a position to communicate information between the two (2) groups. She further
explained that it is possible that the Salvation Army could provide emergency shelter for homeless
individuals on cold nights if the Interfaith Mission runs out of space, but volunteers would be needed
to staff the facility.
Page 8
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 5
Responding to Mrs. Russell, Captain Shurtleff indicated that one of the organizations goals is to
open the Salvation Army’s gym for youth basketball, and to provide the facility as a safe
environment for Friday night dances for young people. She noted that the building may be rented
out to generate income for other programs.
Mr. Ruane expressed his appreciation for the work the Salvation Army is doing in the community.
Silver Lake Revitalization
Mr. Zachery Carter, Director of Parks and Recreation, provided members with a schematic drawing
of Proposed Landscape and Stormwater Improvements for Silver Lake Park (attachment to
Committee minutes), noting that the diagram represents the area of the park that is accessed from
Kings Highway. He explained that the Silver Lake Commission has been working on ideas to
improve the water quality of the St. Jones River and Silver Lake and has discussed the proposal with
the State and with neighbors of the park. Mr. Carter introduced Ms. Laura Allison, the new St. Jones
Watershed Coordinator, who will be working closely with the Silver Lake Commission to discuss
possible improvements. Mr. Carter pointed out areas that are planned for native meadow plantings
to help filter water runoff and reduce the need to mow. He explained that an area between the road
and the river currently consists of dirt with exposed tree roots that are being eroded and will be
replaced with wetland plantings and large, level, boulders will be placed at the edge of the water to
create access to the river for fisherman. Walkways will also be provided to grant access through the
wetland area. Parking will be relocated to the east side of the roadway, and the roadway will be
moved 15-18 feet to the east. He noted that the area east of the road will remain turf grass, and a
stretch of native meadow grasses will be added to the eastern border of the area. Mr. Carter
explained that additional improvements are proposed to improve water drainage from the south end
of the target area.
Mr. Carter noted that the Silver Lake Commission endorsed the plan at their last meeting. He
explained that the proposal was developed so that the group would be prepared to move forward if
stimulus money becomes available.
In response to Mr. Ruane, Mr. Carter estimated the cost of the project at $150,000 to $300,000 and
noted that the State Department of Natural Resources and Environmental Control may also be able
to help with funding.
Responding to Mr. Ruane, Mr. Carter noted that the proposal encompasses Phase 2 of an
improvement plan, and that Phase 1, which involved the establishment of native grasses by the bank
of the river near Division Street, has been completed. He also mentioned that State funds have been
designated to improve the water flow of the ditch that drains Washington Street on the west side of
the Park. Mr. Carter stated that consideration will also be given to how Dover High School and
Delaware Technical and Community College can improve drainage on their properties, which flows
into Silver Lake.
In response to Mr. Ruane, Mr. Carter stated that there is no funding in the City’s Capital
Improvement Plan for the project at this time, but that stimulus fund opportunities are being sought.
Page 9
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 6
The Committee recommended supporting the plan as presented.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
Library Bid Package A
Mr. Zachery Carter, Director of Parks and Recreation, explained that, with the completion of the
Design Development Phase of the Dover Anchor Public Library, the Library Steering Committee is
ready to proceed with completing Construction Documents for Bid Package A, which will allow for
construction of the exit road to Innovation Way from the existing City Hall parking lot, the
relocation of the existing electric utility lines and transformers in this area, and construction of a
retaining wall. These documents will be completed and bid as a separate package to allow this work
to start prior to the library building and overall site construction. Mr. Carter explained that Holzman
Moss Bottino Architecture has been selected to perform this work at a cost of $25,300, which will
cover total expenses and an estimated 10 percent project reimbursables.
In response to Mr. Ruane, Mr. Carter explained that funding for this portion of the project will come
from the Library Reserve Fund and matching funds will be received from a State grant. Mr. Carter
stated the importance of moving forward with this “groundbreaking” project to demonstrate to the
State of Delaware the City’s commitment to the project.
Staff recommended that the Professional Services Contract for Dover Anchor Public Library Bid
Package A – Early Site Package for the Construction Documents, Bidding and Negotiation, and
Construction Administration for the exit road to Innovation Way and the relocation of utilities in this
area be awarded to Holzman Moss Bottino Architecture for the amount of $25,300 (including
reimbursables) and that authorization be granted to the City Manager to enter into this contractual
agreement.
The Committee recommended approval of staff’s recommendation.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation
to award the Professional Services Contract for Dover Anchor Public Library Bid Package A
– Early Site Package for the Construction Documents, Bidding and Negotiation, and
Construction Administration for the exit road to Innovation Way and the relocation of utilities
in this area to Holzman Moss Bottino Architecture for the amount of $25,300 (including
reimbursables) and that authorization be granted to the City Manager to enter into this
contractual agreement. The motion was seconded by Mr. Leary and carried by a unanimous
roll call vote (Mr. Slavin absent).
Construction Manager and Construction Documents
Mr. Zachery Carter, Director of Parks and Recreation, indicated that EDiS Company was selected
as the Construction Management firm for the Dover Anchor Library project in July 2009. They have
completed the work on the Design Development Phase, and the project is now entering the
Construction Documents phase. He explained that this is the final phase before the bidding process
Page 10
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 7
begins for the Dover Anchor Library and is a continuation of work that EDiS completed during the
Design Development Phase. Mr. Carter explained that, under this proposal, EdiS will review all
documents to ensure that all elements follow the City’s desires for the project, as determined in the
Design Development Phase, and that the City obtains a good value for dollars expended.
In response to Mr. Ruane, Mr. Carter noted that EDiS reviewed the initial documents and was able
to reduce the overall budget for the project from approximately $24 million to $22 million. He also
noted that the funds for these services will be allocated from the City’s Library Reserve Fund with
matching funds from the State of Delaware.
Staff recommended that EDiS Company be hired as the Construction Management firm for
pre-construction for the Dover Public Anchor Library and that the City Manager be authorized to
enter into a contractual agreement for the Construction Document Services in the amount of $38,500
(including reimbursables).
The Committee recommended approval of staff’s recommendation.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation
to approve hiring EDiS Company as the Construction Management firm for pre-construction
for the Dover Public Anchor Library and that the City Manager be authorized to enter into
a contractual agreement for the Construction Document Services in the amount of $38,500
(including reimbursables). The motion was seconded by Mr. Leary and carried by a
unanimous roll call vote (Mr. Slavin absent).
After-school Grant - Capital School District
Mr. Zachery Carter, Director of Parks and Recreation, stated that the Capital School District
currently pays the City of Dover to administer recreational after-school programs at Towne Point and
Central Middle Schools. He indicated that the School District has an opportunity to apply for
additional grant funding to expand the program to add 6-8 week recreational sessions in the fall and
winter at Dover High School. Under this proposal, the Parks and Recreation Department would
develop sports and recreational programs, hire skilled employees to provide age and socially
appropriate recreation activities, and engage a part-time individual to oversee the program. If the
School District receives the grant, approximately $25,060 will be available to cover all costs and
fund the program.
In response to Mr. Lewis, Mr. Carter stated that the part-time position would likely be advertised;
however, he noted that the Capital School District may have a qualified individual. He indicated
that sports officials and instructors will probably be contracted.
The Committee recommended that the City of Dover assume oversight responsibility for an
after-school program at Dover High school if the Capital School District receives grant funding.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
Page 11
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 8
UPDATES
Puncheon Run Watershed Action Team Update
No update was provided due to the absence of Mr. Scott Koenig, Public Services Director, during
this portion of the meeting.
Planning and Funding for New Library
Ms. Margery Cyr, Library Director, stated that she met with Mr. There DuPont of the Longwood
Foundation on March 8, 2010, and established that a grant request for $1 million should be submitted
to the Foundation in time to meet Longwood’s March 15, 2010 deadline. She explained that a
request for $1 million dollars in Federal appropriations has been submitted, with the help of
Ms. Lori James from Senator Tom Carper’s office, and noted that the request was sent to
Senator Carper, Senator Ted Kaufman, and Congressman Mike Castle.
Ms. Cyr noted a Library Foundation reception has been scheduled at the Governor’s House on
May 6, 2010 from 5:00 - 7:00 p.m. The event will be hosted by Mrs. Carla Markell and all former
Delaware First ladies will be invited. She explained that this will be an informational event for
potential large donors and will be the lead-in to a large fundraising event to be scheduled soon after.
Ms. Cyr explained that the Library will host a reception on March 16, 2010 for the candidates for
Mayor and City Council to ensure that all those running for office are fully informed of the details
of the Library Anchor Library Project.
Community Development Block Grant (CDBG) Program
Members reviewed a report of the Status of FY 2008-2009 Community Development Block Grant
(CDBG) Projects. Mrs. Ann Marie Townshend, Director of Planning and Community Development,
offered to respond to any questions that members might have regarding the submitted report.
In response to Mr. Ruane, Mrs. Townshend stated that additional funds may have been expended by
First State Resource Conservation and Development Council, Inc. (RC & D) since the Status of
FY 08-09 Program Funds Spent Report was submitted, and she felt confident that all grant funds
would be expended.
Housing and Recovery Act of 2008 Funds (Neighborhood Stabilization Fund)
Members reviewed a report on the Status of FY 2008-2009 Program Funds Spent - Fiscal Year
7/1/09-6/30/10. Mrs. Ann Marie Townshend, Director of Planning and Community Development,
offered to respond to any questions that members may have regarding the report submitted.
Responding to Mr. Ruane, Mrs. Townshend noted that a total of $1.5 million in funds was received,
six (6) properties have been purchased, and a seventh purchase will be closed in the near future. The
goal for the program is to purchase eight (8) properties. Mr. Ruane requested that this type of
information be included in future reports to provide benchmarks for reference.
In response to Mr. Ruane, Mrs. Townshend explained that the Dover Community Partnership, the
Diamond State Community Land Trust, and Connections Community Support Programs are the three
(3) partner agencies that are purchasing the properties. The City of Dover is passing through the
Page 12
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 9
funds, developing the specifications for any rehabilitation that needs to take place, and providing
down payment assistance.
In response to Mr. Ruane, Mrs. Townshend stated that properties being purchased are distributed
throughout the City.
Comprehensive Plan Implementation Status Report
Mrs. Ann Marie Townshend, Director of Planning and Community Development, stated that her staff
has been working on several projects related to the implementation of the Comprehensive Plan,
including a Master Plan for Garrison Oak, Environmental Protections, Evaluation and Update of
Historic Guidelines, and Open Space Zones.
In response to Mrs. Horsey, Mrs. Townshend indicated that staff attends Historic District
Commission monthly meetings where portions of the Historic District Guidelines are reviewed. She
noted the group is attempting to clarify historic standards as they relate to areas such as Loockerman
Street and The Green.
Mrs. Townshend stated that the two (2) largest projects related to the Comprehensive Plan that staff
is addressing are the environmental ordinances and the Open Space Zone. She stated that staff has
had two (2) meetings with stakeholders, including the Department of Natural Resources and
Environmental Control and the Sierra Club. She noted that work continues with the Open Space
Zone and that staff expects to bring a draft of the Open Space Zone to the April Committee meeting.
Referring to the Open Space Zone, Mr. Ruane inquired whether there was a need for change in the
code to include provisions for open space in the event of developer bankruptcies. During the City
Council meeting of April 12, 2004, City Council approved an Open Space Plan for the Nottingham
Meadows Subdivision at a cost in excess of $500,000. Mr. Ruane noted that the implementation of
the plan is now in question due to financial difficulties encountered by the builder.
Mrs. Townshend noted that if remaining lots in Nottingham Meadows are purchased, the active
recreation area will have to be constructed before building permits can be issued. In response to
Mrs. Donna Mitchell, Controller/Treasurer, she noted that open space requirements are listed on
development plans, and any prospective purchaser would therefore be aware of this requirement.
Mr. DePrima noted that there is no provision for residents already in the community who purchased
homes with the expectation of open space being included in the development. Mr. DePrima noted
that the subdivision ordinance includes the requirement of performance bonds for street programs
and suggested that consideration be given to the institution of similar provisions for community
buildings and park areas to fund construction in case of default.
Mrs. Townsend noted there are some municipalities in Delaware that have established this
requirement for open space. Under this approach, she explained that the developer is required to
obtain a letter of credit from a bank which the municipality could call to pay for construction in the
event of default.
Page 13
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 10
The Committee recommended that staff explore ways of requiring additional performance bonding
related to the Open Space Creation Program.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
Youth Advisory Committee
Mrs. Russell explained that the Youth Advisory Committee will hold a special meeting on
March 18, 2010, to prepare for a clothing drive. The Committee is also discussing membership
requirements and replacement of members who are departing for college in the fall.
By consent agenda, Mr. McGlumphy moved for acceptance of the Parks, Recreation, and
Community Enhancement Committee Report, seconded by Mr. Leary and carried by a
unanimous roll call vote (Mr. Slavin absent).
UTILITY COMMITTEE REPORT - MARCH 8, 2010
The Utility Committee met on March 8, 2010 with Chairman Ruane presiding.
Garrison Energy Center
Mr. Ronald Lunt, Director of Public Utilities, introduced Mr. Jim Rexroad, principal party with
Garrison Energy Center, and reminded members that since May 2007, the Dover 2030 Committee
has been meeting regularly to review the PJM Market, evaluate the capacity/energy requirements of
the electric system, and generally develop and evaluate plans to provide low-cost, reliable power to
Dover’s citizens today and in the future. He noted that after extensive discussions on the market
capacity and energy shortfalls, it was decided to solicit the energy/power plant development market
to gain knowledge of what options are available to the City through a Request for Qualifications
process. Mr. Lunt explained that the goal was to assess options presented by the developers. This
concept was outlined at several Utility Committee Meetings. The City then completed Phase II of
the project, which was the evaluation of the proposals and the selection of four (4) options in which
to enter negotiations. Mr. Lunt stated that the agreement presented to members is the second to be
considered from the negotiations process and will be for a land lease option to a power plant
developer that is considering building a 150-300 megawatt (Mw) natural gas combined cycle
generation facility (plant). He explained that the City would have the option of attaining power from
the developer through a Power Purchase Agreement (PPA). If approved, Mr. Lunt stated that the
developer will have the sole right to execute a long term land lease.
Mr. Lunt advised members that the proposed option is currently identified as Lot 7, which is located
in the northeast corner of the Garrison Tract and consists of approximately 36.8 acres of useable
land. He stated that, in addition to Lot 7, the developer is requesting an option for approximately
10.5 acres for a construction lay-down area, and 28.3+/- acres of buffer land, which is not able to be
developed due to wetland issues. Mr. Lunt stated that the proposed option is for one year with an
automatic one (1) year extension, should the developer decide to execute. He explained that an
additional year may be added, for a total of three (3) years, provided that the developer files an
interconnection with PJM, an air permit application, and a national gas interconnection, and requests
an extension from the City. Mr. Lunt stated the developer will compensate the City $2,800 per year
Page 14
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 11
for the right to develop in the future and that the City would continue to receive income from the
agricultural operations.
The City contracted with Alvarez and Marsal Real Estate Advisory Services to perform a
comprehensive land valuation. It was noted that Alvarez and Marsal recommended that the City
collect between $450 to $550 annually for each acre; however, if the developer decides to construct
the power plant and executes the lease, the City would collect $700 per acre plus annual inflation
adjustments.
Mr. Lunt assured members that the option to lease Garrison Tract has been viewed by the City’s
attorney, Mr. Kirk Betts of Betts and Holt, and he approved the document in its final form. Staff
recommended that the City Manager be authorized to execute the lease agreement with Garrison
Energy, LLC, as per the terms outlined in the lease.
It was noted that some proprietary information has been redacted from the presented option
agreement and that this information was shared with City Council during the Executive Session held
earlier this evening.
Responding to Mr. Ruane, Mr. Lunt stated that the advantages of having a tenant on the property
include:
• Income from the lease.
• Property would be taxable.
• Use of water if a plant were built.
• Bringing natural gas into Garrison Tract, which could possibly be used by other tenants on the
property.
• Generation asset located within the City of Dover.
• If a Power Purchase Agreement (PPA) is executed, the generator could be interconnected
directly into the City’s system; however, this would be negotiated in the PPA since there are
additional costs; therefore, it would have to be negotiated.
• If approved through PJM, the generator will interconnect into Delmarva’s 230 kV system
(Cartanza Substation), which will aid in congestion costs and options on the Delmarva
Pennisula. Mr. Lunt explained that with reduced congestion, the Locational Marginal Pricing
(LMP) may also decrease.
• Decommissioning clause allows the City to get the property back into its original condition.
• Provides a collaboration between the City and developer.
In response to Mr. Hogan, Mr. Lunt explained that NRG has closed two (2) plants in Indian River
and has agreed to close an additional plant; therefore, the City will be losing more capacity than the
proposed plant will be bringing in. Mr. Lunt advised members that RE units 1 and 2 are near the end
of their life cycle, and at some point they will be retired and the City will lose an additional 37
megawatts (Mw).
Responding to Mrs. Williams, Mr. Lunt stated that retired units will likely be held in place for the
time being in the unlikely event that there is a change that would make re-powering them
worthwhile. He noted that recycling the scrap metal would be labor intensive and, therefore,
probably not profitable.
Page 15
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 12
In response to Mr. Ruane, Mr. Lunt stated that the City has a letter of intent for the Blue Water Wind
project and that the renewable portfolio will be secure if it is built.
The Committee recommended that the City Manager be authorized to execute the lease agreement
with Garrison Energy, LLC, as per the terms outlined in the agreement and with final approval of
City Council.
By consent agenda, Mr. McGlumphy moved to authorize the City Manager to execute the lease
agreement with Garrison Energy, LLC (Exhibit #2), as recommended by the Committee. The
motion was seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin
absent).
Discussion - Green Energy Grant Program
On January 22, 2007, City Council adopted the Municipal Utilities’ Green Energy Fund Program
Caps and Regulations. The program was developed by the Delaware Municipal Electric
Corporation, Inc. (DEMEC) and allows for the City to provide comparable grant limits and
regulations to most other municipal and investor-owned utilities within Delaware.
Mr. Anthony DePrima, City Manager, reminded members that under this program, a small portion
of the bills of municipal and Delaware Electric Cooperative electric users is paid into a Green Energy
Fund which is used to fund grants for green energy projects. He noted that currently municipalities
are finding that the amount of grant funds requested exceeds available funds, resulting in lengthy
waiting lists. He noted that the City currently has a seven (7) month waiting list and is requesting
that individuals who wish to enter the program sign an agreement acknowledging that they may not
receive their grant money for several months. Mr. DePrima stated that the City of New Castle, Town
of Smyrna, and Town of Clayton have discontinued accepting applications for green energy projects
due to this problem. He explained that these municipalities are planning to place this money toward
projects that would benefit the entire system, such as conservation programs for public buildings and
increasing efficiency in the utility systems, rather than financing individual projects. He noted that
municipalities will begin this process by paying off pending grants and discontinuing initiating new
grants.
Mr. DePrima suggested that the City consider discontinuing the program until it is caught up and
then possibly re-evaluate it, due to the extensive waiting lists. He also noted that the program was
approved to fund demand-side management, energy efficiency, and green energy programs, and
suggested that it might be more appropriate to target system-wide improvements that would benefit
all users. In addition, he stated the State Energy Office will be providing programs similar to those
currently being financed through this fund, and there is a tax credit available for green energy
projects, so applicants may have access to other funding options.
Mr. Hogan suggested that the City place a moratorium on accepting new applications until the list
is reduced. However, he advocated an eventual return to funding individual projects as well,
possibly reserving half of the funds for system-wide improvements and the other half for individual
and commercial projects.
Page 16
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 13
Mr. McGiffin felt that the implementation of green energy changes by individual consumers is
beneficial to everyone.
Mr. DePrima noted that placing a moratorium would allow time to receive information from the
State Office of Energy regarding the distribution of funds that may be made available either to
municipalities or to consumers to fund green energy projects.
Mr. McGiffin stated that, during the Utility Committee meeting of February 22, 2010, it was noted
that the City had $111,518 pending in grant applications.
Mr. DePrima explained that the City receives approximately $10,000 per month in revenue from the
Green Energy Rate. In addition, he noted that many of the grant applicants are commercial users
rather than individuals, and that the City itself is an applicant for a geothermal project planned for
the new library.
In response to Mr. Snaman, Mr. DePrima stated that the City would continue to receive the federal
tax credit.
Responding to Mr. Ruane, Mr. DePrima stated that he believed that there were eight (8) or nine (9)
projects on the waiting list and that staff would provide members with a detailed report at a future
meeting.
PACE/NAES Monthly Report (January)
Members were provided the PACE/NAES Monthly Report for January. The report was provided
to allow members the opportunity to monitor what is being sold in electric and the revenues received,
which will give members a better understanding of any fluctuations and make improvements if
deemed necessary. Although it was not staff’s intention to make a presentation of the report, they
welcomed any questions.
Mr. Anthony DePrima, City Manager, advised members that the budget was reset as part of the
mid-year review process. He further mentioned that, due to the cold weather, January’s actual usage
was above the projected low. Mr. DePrima noted the Environmental Protection Agency (EPA) has
requested that the plant be turned on in June for testing, which will cost the City approximately
$500,000 in fuel and operating expenses. He stated that the testing would increase emissions by 1/3
and that he will be meeting and corresponding with the Congressional delegation to brief them on
this issue.
The Committee recommended acceptance of the report.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
By consent agenda, Mr. McGlumphy moved for acceptance of the Utility Committee Report,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
Page 17
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 14
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
MARCH 8, 2010
The Legislative, Finance, and Administration Committee met on March 8, 2010 with Chairman
McGlumphy presiding.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of the Hiring Freeze
for Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review and
approval of the Legislative, Finance, and Administration Committee and City Council. It was
suggested that there be a “standing” agenda item to consider the filling of critical positions and, if
there are no positions to consider, the item could be removed.
Inspector I - Code Enforcement
Mrs. Ann Marie Townshend, Director of Planning and Community Development, stated that the
employee who anticipated military deployment has informed her that deployment is not planned at
this time; therefore, the request is no longer necessary and no further action is required.
Utility Maintenance Mechanic I - Public Utilities
Mr. Ronald Lunt, Public Utilities Director, explained that, due to the transfer of an employee, it is
necessary to hire a Utility Maintenance Mechanic I in the Public Utilities Department. He advised
members that three (3) of six (6) departmental employees have left due to retirement or transfer, and
if this position is not filled, the City will no longer be able to maintain systems as necessary.
Responding to Dr. Jones, Mr. Lunt indicated that advertisement for vacant positions is handled by
the Human Resources Department; however, he stated that it may be necessary to advertise in the
Wilmington News Journal, particularly for the Utility Maintenance Mechanic II position (see next
agenda item), due to the amount of experience required.
The Committee recommended that staff be granted permission to recruit for the position of a Utility
Maintenance Mechanic I - Public Utilities, as requested by staff.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
Utility Maintenance Mechanic II - Public Utilities
Mr. Lunt explained that, due to the retirement of an employee, it is necessary to hire a Utility
Maintenance Mechanic II in the Public Utilities Department. He advised members that three (3) of
six (6) departmental employees have left due to retirement or transfer, and if this position is not
filled, the City will no longer be able to maintain systems as necessary.
The Committee recommended that staff be granted permission to recruit for the position of a Utility
Maintenance Mechanic II - Public Utilities, as requested by staff.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent).
Page 18
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 15
Proposed Ordinance Amendment No. 1 to Proposed Ordinance #2010-05 - Chapter 2 -
Administration, Article VI - Other Post-Employment Benefits Fund, Section 2-505 - Medicare
Part B Premium Reimbursements
During their meeting of January 25, 2010, the Committee recommended adoption of Proposed
Ordinance #2010-05 - Chapter 2 - Administration, Article VI - Other Post-Employment Benefits
Fund, Section 2-505 - Medicare Part B Premium Reimbursements, as recommended by staff.
During the First Reading of Proposed Ordinance #2010-05 at the Regular Council Meeting of
February 22, 2010, members were presented Amendment No. 1 for their consideration. During this
meeting, Mr. Hogan stated that since the Committee meeting was held, a member of City staff
submitted some suggested language which he felt would make the ordinance more appropriate and
agreeable. Members were provided the ordinance with the proposed amendments that are reflective
of the suggestions, as follows: amendment of lines 12 and 13, by eliminating “can be changed or
eliminated at any time” and inserting “can be reevaluated annually for changes or elimination”;
and lines 17 and 18, by eliminating “or resolution” and inserting,” with a public hearing,” and “and
with a 90-day written notice to those employees who are currently receiving or who are eligible for
Medicare Part B Reimbursement,”. Mr. Hogan explained that the ordinance presented for
consideration at this time had been amended since the Legislative, Finance, and Administration
Committee made its recommendation.
After much discussion, Council referred Amendment #1 to Ordinance #2010-05 back to the
Legislative, Finance, and Administration Committee for their review and recommendation.
The Committee recommended reaffirming the Committee action of January 25, 2010 for adoption
of Ordinance #2010-05 with the original language.
By consent agenda, Mr. McGlumphy moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote (Mr. Slavin absent). (The
First Reading of the ordinance will take place during the latter part of the meeting).
By consent agenda, Mr. McGlumphy moved for acceptance of the Legislative, Finance, and
Administration Committee Report, seconded by Mr. Leary and carried by a unanimous roll
call vote (Mr. Slavin absent).
MONTHLY REPORTS - JANUARY 2010
By motion of Mr. McGlumphy, seconded by Mr. Leary, the following monthly reports were
accepted by consent agenda:
CIP
Dover Fire Department Report
EVALUATION OF BIDS - UNDERGROUND UTILITY LOCATING SERVICES
Mr. Anthony DePrima, City Manager, stated that the Public Utilities Department is a member of
Utilities Service Protection Center of Delmarva, Inc., also known as Miss Utility, which is a call
center that receives excavation requests from all parties and notifies the Utilities of utility locating
requests in our service area. He advised members that, historically, the City of Dover Public Utilities
Department has performed the locating function with staff employees; however, both staff utility
Page 19
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 16
locators recently retired. To determine the lowest cost alternative, staff evaluated the cost of
in-house personnel versus contracting out the locating service for electric, water, wastewater and
communication facilities. Mr. DePrima stated that the City would save $2,300 - $8,800 annually by
contracting this service. He noted that ticket requests decline during the winter months, and it is
expected that two (2) contracted employees will not be needed during this time; therefore, staff is
confident that there will be an increased savings.
Mr. DePrima indicated that proposals were solicited and advertised according to City Policy by the
City’s Contract and Procurement Manager under RFP #10-0029DPU, and submissions were received
from five (5) contractors. The proposals were evaluated based on experience, response time,
geographic knowledge, ticket management, and cost, and the highest evaluated proposal was also
the lowest cost proposal received from Underground Locating Services (ULS). Mr. DePrima noted
that the contractor will be responsible for locating underground utilities owned by the City of Dover
and will be liable for any utilities damaged due to incorrect locating. Additionally, the contractor
will manage the Miss Utility ticket process, which includes receiving the tickets directly from
Miss Utility, marking the involved utilities, and entering the information in the web-based reporting
system. The City of Dover will be responsible for providing the contractor with periodic updated
prints and files of newly installed utilities.
Mr. DePrima stated that the proposed contract from Underground Locating Services (ULS) is for a
period of three (3) years, with two (2) one-year extensions, and includes an annual increase of 2%
the second year, 1% the third year, 2% the fourth year, and 1% the fifth year. He noted that the
Public Utilities Department has been using ULS for a few months, and their performance to date has
been very good.
Staff recommended awarding a three (3) year contract with two (2) one-year extensions to
Underground Locating Services, LLC.
Mr. Hogan moved for approval of staff’s recommendation, seconded by Mr. Leary and carried
by a unanimous roll call vote (Mr. Slavin absent).
APPOINTMENT OF BOARD OF ASSESSMENT APPEALS COMMITTEE
In accordance with Section 102-181, Board of Assessment Appeals, of the Dover Code, the
following appointments were submitted for consideration:
Three-Year Terms to Expire March 2013
Thomas Burns (Real Estate Brokerage or Sales)
James Galvin (Undesignated)
William Garfinkel (Undesignated)
Four-Year Terms to Expire March 2014
John Kelly (Accounting)
Todd Stonesifer (Real Estate Brokerage or Sales)
James Welsh (Property Appraisal/Assessments)
Responding to Mr. Ruane, Ms. Cheryl Russell, City Assessor, advised members that there were
previously three (3) members who served on the Appeals Committee. She stated that the ordinance
Page 20
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 17
requires no less than three (3) members, and since the majority of the members have full-time
employment and may not be able to attend every meeting, the six (6) members would help assure
that the minimum number of members would be in attendance. She also advised members that the
six (6) individuals submitted had requested the opportunity to serve on the Committee. Although
there are members who are active in the real estate community, Ms. Russell did not feel there would
be any potential conflicts. She assured members that a meeting would be held with the Board prior
to the review of any appeals and that she would explain the requirement for abstaining from voting
if there are any conflicts of interest.
Mr. Hogan felt that with six (6) members there is a possibility of having tie votes and also noted the
difficulty of filling a large number of vacancies on the Committee when the terms expire. He
suggested appointing five (5) members, with one (1) member being appointed for a one (1) year
term, one (1) member for a two (2) year term, one (1) member for a three (3) year term, and two (2)
members for a four (4) year term. This would ease the transition for new appointees and present the
need to only make one (1) or two (2) appointments each year.
Mr. Leary moved for approval of the appointments to the Board of Assessment Appeals Committee
as submitted, seconded by Mr. McGlumphy.
In response to Mr. Salters and others who relayed concerns regarding the even number of Board
members and what was perceived to be an excessive number of appointees from the real estate
industry, Mr. Leary questioned the reluctance to have highly qualified volunteers from a particular
field serving on a Board since they have expertise in the subject.
After speaking with the City Solicitor, Mr. Anthony DePrima, City Manager, explained that,
although there will be six (6) members serving on the Board, staff would not have to empanel all
members for all hearings. Assuming all members could make the hearing, he suggested that one (1)
member would be requested to “sit out” and that the members could be rotated in this manner. This
could be accomplished simply by the City Assessor having an understanding that there would be only
five (5) members serving at a hearing.
For clarification, Council President Williams stated that the City Solicitor indicated that an
amendment to the motion would not be required to request the City Assessor to empanel only five
(5) members for each hearing.
Mr. Leary moved for a call for the question, seconded by Mrs. Russell and carried by a roll
call vote of seven (7) yes, two (2) no (Mr. McGiffin and Mr. Ruane), and one (1) absent
(Mr. Slavin).
The motion for approval of the appointments to the Board of Assessment Appeals Committee
as submitted was carried by a roll call vote of five (5) yes, three (3) no (Mr. McGiffin,
Mr. Salters, and Mr. Ruane), and one (1) absent (Mr. Slavin).
REZONING REQUESTS/FIRST READINGS
Requests were received to rezone the following properties. Prior to amending the zoning ordinances
and zoning map of the City of Dover, a public hearing is required.
Page 21
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 18
Property Located at 1059 Horsepond Road, Owned by David and Sherry Blake
A rezoning request for property located at 1059 Horsepond Road (east side of Horsepond Road, south
of Lafferty Lane), consisting of 1.8612+/- acres, owned by David and Sherry Blake. The property is
currently zoned M (Manufacturing) and AEOZ (Airport Environs Overlay Zone). The proposed
zoning is C-3 (Service Commercial) and AEOZ.
By motion of Mr. McGlumphy, seconded by Mr. Salters, Council unanimously referred the
following rezoning request to the Planning Commission on April 19, 2010 and set a public
hearing before City Council for May 24, 2010 at 7:30 p.m.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
Proposed Zoning Ordinance #2010-09 as read by the City Clerk, by title only, as follows:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 1059 HORSEPOND ROAD.
Property Located at 1169 South State Street, Owned by Young Men’s Christian Association
of Delaware, Inc. (YMCA)
A rezoning request for property located at 1169 South State Street (east side of South State Street, north
of Roosevelt Avenue/Wyoming Avenue), consisting of 0.6899+/- acres, owned by Young Men’s
Christian Association of Delaware, Inc. (YMCA). The property is currently zoned RG-O (General
Residence and Office) and the requested zoning is IO (Institutional and Office).
By motion of Mr. McGlumphy, seconded by Mr. Hogan, Council unanimously referred the
following rezoning request to the Planning Commission on April 19, 2010 and set a public
hearing before City Council for May 24, 2010 at 7:30 p.m.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
Proposed Ordinance #2010-10 as read by the City Clerk, by title only, as follows:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 1169 SOUTH STATE STREET.
FIRST READING - PROPOSED ORDINANCE #2010-05
Council President Williams reminded the public that copies of the proposed ordinance are available
at the entrance of the Council Chambers or can be obtained from the City Clerk's Office. Final
action by Council on the proposed ordinance will take place during the Council Meeting of
April 12, 2010.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
Proposed Ordinance #2010-05 as read by the City Clerk, by title only, as follows:
CHAPTER 2 - ADMINISTRATION , ARTICLE VI - OTHER POST -EMPLOYMENT BENEFITS
FUND , SECTION 2-505 - MEDICARE PART B PREMIUM REIMBURSEMENTS
Page 22
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 19
FINAL READING - PROPOSED ORDINANCES
The First Reading of the following proposed ordinances was accomplished during the Council
Meeting of March 8, 2010.
Proposed Ordinance #2010-06 Amending Chapter 102 - Taxation, Article VI - Exemptions;
Board of Assessments, Section 102-183 - Tax Exemptions for Senior Citizens, Subsection (B) -
Qualifications, Paragraph (3) - Exclusions from Income
Mr. Hogan moved that the Final Reading of the proposed ordinance be acknowledged by title
only, seconded by Mr. McGiffin and unanimously carried.
By motion of Mr. McGiffin, seconded by Mr. Leary, Council, by a unanimous roll call vote
(Mr. Slavin absent), adopted Ordinance #2010-06 as follows:
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Chapter 102 - Taxation, Article VI - Exemptions; Board of Assessment Appeals, Section
102-183 - Tax Exemptions for Senior Citizens, Subsection (b) - Qualifications, Subsection (3) -
Exclusions from Income, be amended to read as follows:
Sec. 102-183. Tax exemption for senior citizens.
(a) Authority. This section is adopted to implement 22 Del. C. § 1001 et seq., granting
exemptions from municipal taxation on real property for persons 65 years of age or over.
Compliance must be made with such chapter 10 and this section in order to qualify for such
exemption.
(b) Qualifications. The exemption shall be for real property owners 60 years of age or over.
If qualified, their real property shall be exempt from municipal taxation to the extent of the
first $50,000.00 of assessed valuation. This exemption shall be subject to the following:
(1) Owner resides alone. If the income of a property owner who resides alone exceeds
the sum of $15,851.00 (2008) for the income tax year immediately preceding the date of
making an application for the exemption, then the exemption shall not be granted. The
maximum income limit stated in the preceding sentence shall increase each year by the
same percentage as the cost of living adjustment granted to recipients of Social Security
retirement benefits.
(2) Spouses reside together. If the income of a property owner and spouse who reside
together exceeds the sum of $22,192.00 (2008) for the income tax year immediately
preceding the date of making an application for the exemption, then the exemption shall
not be granted. The maximum income limit stated in the preceding sentence shall
increase each year by the same percentage as the cost of living adjustment granted to
recipients of Social Security retirement benefits.
Page 23
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 20
(3) Exclusion from income. In computing income of the property owner in order to
determine entitlement for the deduction, Social Security benefits; railroad pensions and
federal civil service retirement (not to exceed the sum of $35,190 (2010) - 150 % of the
Social Security maximum benefit. The civil service retirement income exclusion shall
be based each year on the maximum Social Security benefit at 150%), shall not be
considered as income.
ADOPTED: MARCH 22, 2010
Proposed Ordinance #2010-07 Amending Chapter 98 - Streets, Sidewalks and Other Public
Places, Chapter 110 - Utilities, Article III - Water Service, Chapter 110 - Utilities, Article IV -
Sewer Service, and Appendix F - Fees and Fines
Mr. Salters moved that the Final Reading of the proposed ordinance be acknowledged by title
only, seconded by Mr. Leary and unanimously carried.
By motion of Mr. McGlumphy, seconded by Mr. Salters, Council, by a unanimous roll call vote
(Mr. Slavin absent), adopted Ordinance #2010-07 as follows:
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Chapter 98 - Streets, Sidewalks and Other Public Places, be re-titled as Streets, Sidewalks,
Storm Sewers and Other Public Places.
BE IT FURTHER ORDAINED THAT:
That Chapter 98 - Streets, Sidewalks and Other Public Places, Article I - In General, Section 98-1
- Street department created; purpose, be amended to read as follows:
ARTICLE I. IN GENERAL
Sec. 98-1. Street department created; purpose.
There is hereby created a street department under the general supervision and authority of the
city manager, which shall superintend and have authority over the use, construction, condition and
lighting of city streets, sidewalks, storm sewers and public places.
BE IT FURTHER ORDAINED THAT:
That Chapter 98 - Streets, Sidewalks and Other Public Places, be amended by inserting a new Article
V - Storm Sewers and Excavations, to read as follows:
Page 24
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 21
ARTICLE V. STORM SEWERS
Sec. 98-161. Definitions.
The following words, terms and phrases, when used in this ordinance, shall have the
meanings ascribed to them in this article, except where the context clearly indicates a different
meaning:
Drain means any pipe which carries water in a drainage system.
Private storm sewer means any storm sewer not owned by the city.
Public storm sewer means any storm sewer owned by the city.
Storm sewer means any system used for conveying rain water, stormwater, surface water,
condensate, cooling water or similar liquid wastes, exclusive of sewage.
Sec. 98-162. Connections.
(a) It shall be unlawful for any person to tap or to have tapped any public storm sewer
without a permit from the city manager.
(b) It shall be unlawful for any person other than the city to tap any public storm sewer. The
city shall tap the sewer as described in the permit, and the permittee shall pay the fees and
charges based upon unit prices as the city incurs.
Sec. 98-163. Public storm sewer design and construction.
Public storm sewers shall be designed and constructed according to city specifications, three
copies of which shall be on file in the city clerk's office.
Sec. 98-164. Prohibited discharges into system.
(a) Injurious substances. It shall be unlawful for any person or group of persons to throw,
place, or deposit, or attempt to throw, place or deposit, or cause to be thrown, placed or
deposited, any article, object or substance in any of the storm sewers or into any of the inlets
into the storm sewers of the city, or into any of the streets, lanes, alleys, or gutters of the
streets in the city from which such article, object, or substance would be likely to enter into
or run into the storm sewers of the city, which object, or substance would injure in any
manner said storm sewer system or area into which such storm sewers empty.
(b) Definition. Wherever the term "system" is used, such term shall be taken to include, in
addition to any other meaning herein indicated, any conduits, reservoirs, ditches, grates, catch
basins, storm manholes, gauges, and building or buildings and the attachments thereto
wherein any such machinery or parts thereof are kept or stored.
(c) Tar, petroleum, etc. It shall be unlawful to pour, drain or run into the storm sewers of
Page 25
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 22
the city, by any method whatsoever, any tar or tar product, or petroleum or petroleum
product, or any inflammable substance or material.
(d) Protection of equipment. It shall be unlawful to pour or drain into or permit the
drainage into any of the storm sewers or storm sewer system of the city any substance or
chemical which would hinder the proper functioning of the storm sewer system or in any way
negatively impact any related permits held by the city.
(e) Garbage, etc. It shall be unlawful to deposit or throw, or cause to be deposited or
thrown into any receptacle connected with a public or private storm sewer of the city, any
garbage, ashes, cinders, rags, waste of any kind whatsoever or to discharge or permit to be
discharged into any private or public storm sewer within the city, anything that will injure
such storm sewer or will obstruct the use and operation thereof.
Sec. 98-165. Authority to enter and inspect private property.
The city manager and his authorized agents shall have the authority to enter upon any lands
as may reasonably be necessary to discharge their duties pursuant to this article. Pursuant to the
entry, the city manager and his authorized agents shall properly discharge their duties, which may
include inspection, conveyance or removal of materials necessary for construction upon the land or
improvement or repair of any drain, gutter, storm sewer, manhole or natural watercourse.
Sec. 98-166. Violations.
(a) Notice. Whenever the city manager or his authorized agents shall determine that a
condition exists which violates any portion of this article, the city manager or his authorized
agents shall notify the property owner or occupant of the specific violation.
(b) Action by city. Unless the condition is remedied within ten days after notice is given,
the city may cause the condition to be remedied and assess the cost thereof against the
property owner.
(c) Payment of cost. Any person violating any of the provisions of this article shall, upon
conviction therefore, pay to the city the cost of any of the repairs resulting from the violation
and be subject to the penalty provided in section 1-17.
Secs. 98-167--98-220. Reserved
BE IT FURTHER ORDAINED THAT:
Chapter 98 - Streets, Sidewalks and Other Public Places, be amended by renumbering Article V -
Excavations as Article VI, renumbering Division 1 - Generally, Sections 98-161 through 98-190 as
98-221 through 98-250 respectively, and renumbering Division 2 - Permit, Sections 98-191 through
98-220 as 98-251 through 98-280 respectively.
Page 26
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 23
BE IT FURTHER ORDAINED THAT:
Chapter 98 - Streets, Sidewalks and Other Public Places, be amended by re-numbering Article VI
- Parades as Article VII, renumbering Division 1 - Generally, Sections 98-221 through 98-240 as
98-281 through 98-300 respectively, and renumbering Division 2 - Permit, Sections 98-241 through
98-280 as 98-301 through 98-340 respectively.
BE IT FURTHER ORDAINED THAT:
Chapter 98 - Streets, Sidewalks and Other Public Places, be amended by renumbering Article VII
- Numbering of Buildings as Article VIII, and renumbering Sections 98-281 through 98-286 as
98-341 through 98-346 respectively.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article III - Water Service, Division 1 - Generally, be amended to read as
follows:
Chapter 110 UTILITIES
ARTICLE III. WATER SERVICE*
__________
*Charter references: Power of council to operate water plans, subpart A, § 25.
__________
DIVISION 1. GENERALLY
Sec. 110-61. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings
ascribed to them in this section, except where the context clearly indicates a different meaning:
Customer means any person supplied with water service by the city.
Service line means a water line connected to the water main for the purposes of serving a
customer.
Water main means any public water line, other than a service line.
Water service fees means water use fees.
Water tap means the connection of a service line to a water main.
(Code 1968, § 32-1; Ord. of 4-8-1974; Code 1981, § 22-177)
Page 27
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 24
Sec. 110-62. Water department created.
There is hereby created a water department.
(Code 1968, § 2-76; Code 1981, § 22-176)
Sec. 110-63. Water handbook incorporated by reference.
The City of Dover Municipal Water Department's Water Handbook is hereby incorporated
by reference into the laws of the city. A copy of the aforesaid handbook shall be filed in the city
clerk's office and available to the public for inspection.
Sec. 110-64. Sprinkling limitation.
When an emergency to the water supply exists, the city manager shall order public water
users to limit or stop sprinkling streets, grass or other vegetation.
(Code 1968, § 32-12; Ord. of 4-8-1974; Code 1981, § 22-182)
Sec. 110-65. Supplying nonusers with city water.
It shall be unlawful for any customer purchasing water from the city to supply such water to
persons who are not customers or who have no water connections with the public mains.
(Code 1968, § 32-19; Ord. of 4-8-1974; Code 1981, § 22-185)
Sec. 110-66. Deposit for customers who purchase water for redistribution.
Those customers who purchase water for redistribution shall pay a deposit in an amount to
be determined by the city manager.
(Mo. of 4-8-1974, § X; Code 1981, § 22-186)
Sec. 110-67. Private wells.
(a) When authorized. It shall be unlawful, and a nuisance for any person to dig, drill or
otherwise excavate any well more than 150 feet below the surface of the ground within the
city, or one mile thereof, without the permission of the city council given by resolution. No
permission shall be given for a well on any property where a potable water supply is
available.
(b) Shallow wells. Shallow wells may be drilled into and water withdrawn from the
unconfined aquifers within the limits of the city, subject to the following:
(1) All wells shall require a permit from the state department of natural resources
and environmental control or other regulatory agency and the approval of the city
setting forth construction details, design yield, and withdrawal rates.
Page 28
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 25
(2) All wells must have the approval of the state board of health or other similar
regulatory agency for their intended use.
(3) A detailed plan showing the well location, well construction, piping plan and
connection details shall be submitted with the application.
(4) All wells shall be metered by an approved device and daily pumping records
maintained.
(5) All water derived from shallow wells shall be used only for boiler makeup,
cooling water use, and underground irrigation systems.
(6) Any revisions, changes or deviations from the original permit must be in the
same manner as the original permit.
(7) There shall be no interconnection with any public water supply, nor shall the
shallow well be used as a potable water supply for human consumption.
(8) Private irrigation systems shall be completely underground, with no connections
or outlets that could be used for human consumption. Irrigation shall be by sprinkler
heads.
(Code 1968, § 32-14; Ord. of 4-8-1974; Ord. No. 2-78, 4-24-1978; Code 1981, § 22-188)
Secs. 110-68--110-190. Reserved.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article III - Water Service, be amended by deleting Division 2 - Service
Lines, Division 3 - Taps, Division 4 - Meters, and Division 5 - Fire Hydrants, in their entirety.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article III - Water Service, Division 6 - Rates, Charges and Billing
Procedures, be renumbered as Division 2 and amended to read as follows:
DIVISION 2. RATES, CHARGES AND BILLING PROCEDURES
Sec. 110-191. Water use fees generally.
(a) Payment. All water service fees, three copies of which are on file in the city clerk's
office, shall be payable to the city manager.
(b) Penalty. A penalty as provided for in Appendix F--Fees and Fines shall be added to all
water service fees which shall be in arrears for a period in excess of 30 days after the date of
rendering the water service bill.
Page 29
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 26
Sec. 110-192. Charge for discontinuing or restoring water service.
(a) Maintenance and repair. There will be no charge for turning on or off any service for
maintenance and repair purposes if done during normal working hours. There will be a
charge as provided for in Appendix F--Fees and Fines, for all service calls after normal
working hours.
(b) Nonpayment. There will be a service charge as provided for in Appendix F--Fees and
Fines paid, together with all current and overdue charges, prior to turning on any service
discontinued for nonpayment.
(Mo. of 4-8-1974, § IX; Code 1981, § 22-256; Ord. of 8-14-1995)
Secs. 110-193--110-205. Reserved.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article III - Water Service, Division 7 - Water Impact Fees, be amended by
re-numbering it as Division 3.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article IV - Sewer Service be renamed Article IV - Sanitary Sewer Service.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article IV - Sanitary Sewer Service, Division 1 - Generally, be amended to
read as follows:
DIVISION 1. GENERALLY
Sec. 110-231. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings
ascribed to them in this section, except where the context clearly indicates a different meaning:
Customer means any person supplied with wastewater service by the city.
Dwelling means any single or multiple residence or apartment, including those located over
business or commercial establishments. Such term shall not include any hotel, motel or rooming
house.
Lateral means a sanitary sewer line connected to the sanitary sewer main for the purposes
of serving a customer.
Private sanitary sewer means any sanitary sewer not owned by the city.
Page 30
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 27
Public sanitary sewer means any sanitary sewer owned by the city.
Sanitary sewer means a pipe or conduit for carrying sewage and wastewater to which
stormwater, surface water and groundwater are not intentionally admitted.
Sewage means any combination of liquid and water-carried wastes originating in buildings.
Sewer main means any sewer line, other than a sewer lateral, including but not limited to sewer lines
commonly called "interceptors" and "feeders."
Wastewater means the liquid and water-carried industrial or domestic wastes, whether treated
or untreated, from dwellings, commercial buildings, industrial facilities and institutions, together
with any stormwater, surface water and groundwater that may be present though not intentionally
admitted, which is contributed into or permitted to enter the sanitary sewer.
Wastewater system and sanitary sewer system shall be interchangeable for the purposes of
this code.
(Code 1968, § 27-1; Code 1981, § 22-127)
Sec. 110-232. Wastewater department created.
There is hereby created a wastewater department.
(Code 1968, § 2-78; Code 1981, § 22-126)
Sec. 110-233. Wastewater handbook incorporated by reference.
The City of Dover Municipal Wastewater Department's Wastewater Handbook is hereby
incorporated by reference into the laws of the city. A copy of the aforesaid handbook shall be filed
in the city clerk's office and available to the public for inspection.
Sec. 110-234. Rates and charges.
(a) Copies on file. Three copies of the wastewater use rates shall be on file in the city
clerk's office.
(b) Wastewater Fees. All users of the public wastewater system shall be liable for
wastewater fees. Bills for wastewater system usage shall be rendered in conjunction with
bills for city water service for those persons using both city water and wastewater systems.
(c) Water rules apply. Discounts, service charges, payment of service charges,
discontinuance of service and penalties applying to city water rates shall also apply to public
wastewater rates and service.
(Code 1968, §§ 27-8--27-10; Code 1981, § 22-133; Ord. of 4-27-1992)
Page 31
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 28
Secs. 110-235--110-260. Reserved.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article IV - Sanitary Sewer Service, Division 2 - Private Sewage Disposal
Systems, be amended to read as follows:
DIVISION 2. PRIVATE SEWAGE DISPOSAL SYSTEMS
Sec. 110-261. Abandonment.
It shall be unlawful for any person to abandon any cess pool, septic system, drainage field,
or the like except in the manner approved by the State of Delaware Department of Natural Resources
and Environmental Control. Compliance with the abandonment procedure shall occur within 30
days after any notice to abandon and in the manner in which it is to be accomplished.
(Code 1968, § 27-14; Code 1981, § 22-146)
Sec. 110-262. Correction of unsanitary conditions.
It shall be unlawful and a nuisance for the owner or occupant of any property, after the
expiration of three days' notice given by a city inspector based upon his inspection and declaration
that the owner or occupant's cess pool, septic system, drainage field, or the like is overly full, is in
an offensive and noisome condition, to fail to clean and correct those conditions as are set out in the
notice. Any cess pool, septic system, drainage field, or the like that is determined to be in a state of
disrepair must be addressed in accordance with the State of Delaware Department of Natural
Resources and Environmental Control.
(Code 1968, § 27-15; Code 1981, § 22-147)
Secs. 110-263--110-280. Reserved.
BE IT FURTHER ORDAINED THAT:
Chapter 110 - Utilities, Article IV - Sanitary Sewer Service, Division 3 - Wastewater Collection
Impact Fees, Section 110-282 - Establishment of equivalent dwelling units, Paragraph B -
Determination for nonresidential establishments, be amended to read as follows:
(b) Determination for nonresidential establishments. Whenever the city imposes or
assesses wastewater collection and transmission charges or fees on the basis of EDUs, the
number of EDUs to be charged shall be determined using the appropriate specific assessment
as defined in the most recent impact fee ordinance adopted by the Levy Court of the county.
When users propose to discharge wastewater under circumstances other than the specific
assessments defined by the county, the city's impact fee shall be calculated by the city
engineer based on flow in GPD. In such cases where the impact fee is calculated by flow,
each EDU shall be equal to 250 GPD.
Page 32
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 29
BE IT FURTHER ORDAINED THAT:
Appendix F - Fees and Fines, Chapter 110 - Utilities, Article III - Water Service, Division 6 - Rates,
Charges, and Billing Procedures, be amended to read as follows:
Chapter 110 - Utilities, Article III - Water Service, Division 2 - Rates, Charges and
Billing Procedures
Sec. 110-191 Water use fees generally
A penalty of 1 1/2
percent or $1.00,
whichever is greater, per
month shall be added to
all water service fees
Subsec. (b) Penalty
which shall be in arrears
for a period in excess of
30 days after the date of
rendering the water
service bill
Sec. 110-192 Charge for discontinuing or restoring water service
No charge for turning on
or off any service for
maintenance and repair
purposes if done during
Subsec. (a) Maintenance and repair
normal working hours;
$50.00 for all service
calls after normal
working hours
There will be a service
charge of $50.00 paid,
together with all current
Subsec. (b) Nonpayment and overdue charges,
prior to turning on any
service discontinued for
nonpayment
Chapter 110--Utilities, Article III--Water Service, Division 3--Water Impact Fees
ADOPTED: MARCH 22, 2010
Page 33
CITY COUNCIL MEETING OF MARCH 22, 2010 PAGE 30
Council Members Announcements
Mr. McGiffin reminded members to mark their calendars for June 27, 2009 for the next African
American Festival.
Mr. Ruane advised members that there will be a public workshop on the Wyoming Mill Road
Re-Alignment Project held by the Delaware Department of Transportation (DelDOT) at the John
Pitts Center at Schutte Park on Wednesday, April 21, 2010 between 4:00 p.m. and 7:00 p.m. The
purpose of the workshop is to obtain public input on the realignment of the road that will result in
the fully signalized intersection located west of the current intersection of Wyoming Mill and
Hazlettville Road. He stated that this is an important project for the City and encouraged the public
to attend.
On behalf of himself, as well as Mr. McGiffin, Mr. Ruane, Mr. Leary, and the Irish Society,
Mr. McGlumphy stated that he was requested to mention to the Mayor that they missed the Irish flag
flying on St. Patrick’s Day.
Mr. Leary moved for adjournment, seconded by Mr. McGlumphy and unanimously carried.
Meeting Adjourned at 8:04 P.M.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
March 22, 2010, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM/jg
S:\PACKETS\2010\Council\04-12-2010\03-22-2010.wpd
Exhibits Attached to Original Minutes and File Copy
Exhibit #1 - Statement read by Mrs. Sara Herbert
Exhibit #2 - Lease Agreement with Garrison Energy, LLC
Page 35
MAYOR AND COUNCIL
Be It Hereby Known To All That
The Mayor and Council Commend
RICHARD HUDSON
for Dedicated Service to the City of Dover
September 1989 - March 2010
20 Years of Service
The Mayor and Council Extend Sincere
Appreciation and Congratulations
_________________________ __________________________
Mayor Council President
Page 39
ACTION FORM
PROCEEDING: Council AGENDA ITEM
DEPARTMENT OF ORIGIN: Public Services DATE SUBMITTED: March 30, 2010
PREPARED BY: Scott D. Koenig, P.E., Public Services Manager;
Ann Marie Townshend, AICP, Director of Planning and Community Development
SUBJECT: 225 N. Bradford Street, Dover, DE 19901 – Violation of Dangerous Building Ordinance.
REFERENCE: Chapter 22 – Buildings and Building Regulations, Article XI – Dangerous Buildings, Sec. 22-388 –
Emergency Cases Case #10-767
RELATED PROJECT: N/A
APPROVALS: City Manager, Controller/Treasurer
EXHIBITS: PowerPoint Presentation and File Photos to be presented at the Council meeting.
EXPENDITURE REQUIRED: Preliminary estimate is $5,000 -10,000.
AMOUNT BUDGETED: $50,000 (All demolitions City-wide). $15,000 remaining in current fiscal year.
FUNDING SOURCE (Dept./Page in CIP & Budget): 110-1600-534-30-33, page 400 of the 2010 Operating
Budget.
TIMETABLE: As soon as possible.
RECOMMENDED ACTION:
1. Declare this accessory building dangerous.
2. Order the property repaired or demolished by May 12, 2010 by the owner or equity owner at their own risk.
3. Order the Building Inspector to cause the repair or demolition of the structure if not completed by the owner
within (10) days of the date set by Council.
4. Order the City Manager with the assistance of the City Solicitor to cause the cost of repairs or demolition to be
charged against the land on which the building exists as a municipal lien or cause such cost to be added to the
tax duplicate as an assessment, or to be levied as a special tax, or to be recovered in a suit at law against the
owner.
BACKGROUND AND ANALYSIS
This property has been the subject of a number of code violations in recent years. Currently, staff is bringing
forward the rear accessory barn structure for violation of the Dangerous Building Ordinance in accordance with
Chapter 22 – Buildings and Building Regulations, Article XI – Dangerous Buildings, Sec. 22-388 – Emergency
Cases. This is considered an “emergency case” due to the testimony presented by neighbors of the property at
the public forum prior to the March 22, 2010 City Council meeting. According to the testimony, parts of the
barn structure are considerably tilted, the structure is packed with junk and trash, and the structure represents a
potential public safety and fire hazard to the neighboring properties. Additionally, neighbors indicated that the
structure is occupied by a resident who will on occasion utilize electricity from neighboring garages to power
electric heaters and lights. The neighbors’ testimony also included concerns about the stockpiling of garbage in
the yard. Staff has visited the property and verified all of the above concerns except the use of electricity since
this appears to be is an intermittent use. To date, the garbage has been removed, but additional junk and debris
continues to be stored in the yard. The storage of junk, debris and garbage has also attracted rats to the
property.
Due to the evidence of fire hazard, public health and safety violations, and suspected illegal habitation of the
structure, staff recommends the immediate demolition of the structure to remedy the situation.
Page 40
MEMORANDUM
Department of Public Services – Planning Office
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
Date: March 26, 2010
To: City Council
From: Ann Marie Townshend, AICP
RE: Rezoning of Lands of TLFD Management, LLC
On March 15, 2010, the Planning Commission held a public hearing on the rezoning of lands of TLFD
Management, LLC, located at White Oak Road. Following public testimony regarding wet soil conditions and
lacking the State of Delaware PLUS comments, the Planning Commission voted to table the application. Planning
Commission requested that prior to making a decision on the matter; the PLUS comments should be available to
them. Because the dates have been set by City Council, this tabling requires that the date for public hearing and
final action by City Council be rescheduled.
The application has been tabled to the April 19, 2010 Planning Commission meeting. The requested date for this
application to have a public hearing and final reading before City Council is May 24, 2010.
According to the Zoning Ordinance, Article 10 Planning Commission, Section 5 Amendments:
The city council shall not take action on any such amendment without a report from the planning
commission unless the planning commission fails to render such a report within 75 days after its
regularly scheduled meeting following such referral.
The dates set by Planning Commission and proposed for the public hearing at City Council are consistent
with this code citation.
Page 41
PETITION TO AMEND AND ZONING DISTRICT
Public Hearing before the Dover City Council
April 12, 2010
Applicants/Owners: JNK, LLC
Location: 1051 College Road
North Side of College Road, West of McKee Road
Tax Parcel ID #: ED-05-067.00-01-35.03-000
Size: 4.32+/- acres
Present Use: Vacant – Previously approved for Senior Citizen PND
Proposed Use: Residential – Garden Apartments
Comprehensive
Plan Designation: Residential Medium Density
Present Zoning: R-8 (One Family Residence Zone)
Proposed Zoning: RG-2 (General Residence Zone)
Reason for Request: To construct medium density residential dwellings without age
restriction
Recommendation of Following a public hearing before the Planning Commission on
Planning Commission March 15, 2010, Planning Commission moved 6-0 to
recommend approval of the rezoning request.
File Number: Z-09-05
Page 42
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 2
Existing Property
The property is currently zoned R-8 (One Family Residence Zone). It was previously approved
by the Planning Commission as The Arbors: Planned Neighborhood Design - Senior Citizen
Housing Option (C-07-05). As a part of this approval, a road right-of-way was recorded through
the site, connecting College Road with Topaz Circle in Emerald Pointe.
Surrounding Land Uses:
The property is surrounded to the north, west and east by residential uses. To the southeast,
across College Road, there is a church. Emerald Pointe, to the north is zoned R-8 (One Family
Residence Zone), and Hidden Oaks, to the west, is zoned R-10 (One Family Residence Zone).
The adjacent parcel to the east is zoned R-8 (One Family Residence Zone) has an existing
residential use.
Comprehensive Plan:
The 2008 Comprehensive Plan depicts the subject area as Residential Medium Density land use
on the Land Development Plan Map. The requested zoning classification of RG-2 is consistent
with the 2008 Comprehensive Plan.
Request for RG-2 (General Residence Zone)
The following description of the RG-2 zoning district is provided from Article 3 §2 of the Zoning
Ordinance.
Section 2. General residence zones (RG-1 and RG-2).
2.1Uses permitted. In a general residence zone, no building or premises shall be
used, and no building or part of a building shall be erected, which is arranged,
intended or designed to be used, in whole or in part, for any purpose, except the
following:
2.11 Any use permitted in one-family residence zones, except that:
Not more than one professional office or studio, other than accessory to a use
otherwise permitted, shall be permitted for each 25 dwelling units or major fraction
thereof on the lot. Such office or studio shall be only on the street floor of any
building and on the floor immediately above the street floor only if there [shall] be
direct access to such office or studio from outside the building.
2.12 Garden apartments limited to placement within the RG-2 district only.
2.13 Off-street parking accessory to uses located within the central commercial C-2
zone, provided that:
(a) Such parking is situated not more than 150 feet from the C-2 zone.
(b) Parking areas are screened by landscaping from adjoining properties used for
residence.
(c) Illumination of parking areas is shielded from the view of adjoining properties
used for residence.
2.14 Reserved.
2.2Performance standards. All uses are subject to performance standards as set
forth in article 5, section 8.1.
Page 43
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 3
2.3Site development plan approval. Site development plan approval in accordance
with article 10, section 2 hereof shall be required prior to the issuance of building
permits for the erection or enlargement of all structures and related accessory
structures. Such approval shall also be required prior to the issuance of certificates of
occupancy for a change of use.
2.4[Conditional uses.] Conditional uses permitted upon the approval of the planning
commission in accordance with the procedures and general conditions set forth in
article 10, section 1 of this ordinance:
(a) [Omitted, as it only applies to RG-1]
(b) Student homes subject to the following siting and bulk criteria:
i. No student home shall be located closer than 500 feet from any other
student home.
ii. The maximum allowable occupancy shall be four persons or the
occupancy limit as determined by the building and fire codes adopted by the
City of Dover, whichever is less.
iii. Two off-street parking spaces shall be provided per dwelling unit.
iv. A student home shall not be permitted to be established within any semi-
detached dwelling, duplex dwelling, group dwelling, or townhouse dwelling
unit.
v. Buildings or groups of buildings on the same lot with 15 or more units on
the lot shall not be subject to the student home regulations.
vi. Student homes shall be licensed under chapter 10, Housing Code
[chapter 22, Buildings and Building Regulations], article V [X], Rental
Dwellings, of the Code of Ordinances.
vii. Student homes shall be subject to the provisions of chapter 10, Housing
Code [chapter 22, Buildings and Building Regulations], article III [VIII],
Leases, of the Code of Ordinances.
(c) Multiple dwellings subject to the following restrictions:
i. Conversions of single-family dwellings to multi-family residential dwellings
shall be limited to the RG-2 district.
The RG-2 district permits a higher density and a wider range of housing styles than the R-8
district.
Recommendation of the Planning Staff and Planning Commission:
In recommendation to the Planning Commission, the Planning Staff expressed concerns about the
proposal for RG-2 (General Residence) zoning. Staff recommended that RM-2 (Medium Density
Residence) zoning might be more appropriate, as it permits a wider variety of housing styles
(such as one-family detached dwellings, duplex dwellings, apartments, townhouses, and garden
apartments) and a density cap of eight (8) dwelling units per acre. RG-2 zoning does not include
a density cap, and would permit more than eight (8) dwelling units per acre of RM-2. The
surrounding residential subdivisions, Hidden Oaks and Emerald Pointe, are one-family residential
developments.
Page 44
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 4
Planning Staff recommendations are made prior to public testimony on the application.
Following public testimony where members of the public expressed concern about the requested
RG-2 zoning classification, as well as the RM-2 recommended by Staff, the Planning
Commission voted on March 15, 2010 to recommend to City Council that the property be rezoned
to RG-2 in accordance with the applicant’s request.
Excerpt from Minutes of January 19, 2010 and March 15, 2010 Planning Commission
Meetings:
A transcription of the testimony presented at the Planning Commission meeting on January 19,
2010 is below:
Representatives: Mr. Doug Berry, Pennoni Associates; Mr. John Paradee, Prickett,
Jones, & Elliott; and Mr. Jordan Ashburn, Ashburn Homes.
Mrs. Townshend presented and overview of the application.
Mr. Berry stated that this property was subject to an age restricted condominium
application that was approved by the City of Dover in 2009 and known as the Arbors
Senior Condominium project. Due to market constraints, the developer wishes to
remove the age restricted designation. In order to do that the property must be rezoned
to RG-2, which would be consistent with the most recent Comprehensive Plan. There
are no changes to the building foot print, site considerations, or the development density
of 11.11 that is proposed. At this time, a rendering was passed out of the previous
application. We recognize that in the Staff report they had some concerns with regards
to the RG-2 zoning due to a theoretical maximum density of twenty-five (25) dwelling
units per acre for the site. We did a density analysis and presented it to Staff and at this
time, that analysis was handed out to Commission members for overview.
Mr. Berry further stated that how Staff came up with twenty-five (25) units per acre was
to take the minimum required lot area of 1,700 square feet per dwelling unit and divided
it by the total square footage of the property to come out to 110 dwelling units. If you
look at the rendering of the previous application, a lot of this site acreage would come
out of that developable acreage. A public thoroughfare was required to connect the
Emerald Point subdivision to College Road. The right-of-way on that road was
approximately 6/10th’s of an acre which would render this undevelopable. The west side
of the road which is called Senior Way is not developable either because of the building
setbacks required which would render 9/10th’s of an acre undevelopable. Of the
remaining acreage, .4 acres were reserved for stormwater management; therefore,
there was only 2.5 acres rendered feasible for development. Of that 2.5 acres, the site
was laid out in a fashion where the buildings, the parking areas, landscaping, required
active recreation space, and if you take these areas that were set aside for
development, the net developable acreage is approximately 2.5 acres.
Mr. Berry further stated that if you look at the building footprint expansion in any
direction it is not feasible. If you go to the west you are in the stormwater management
Page 45
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 5
area and if you go to the south you are in an arterial buffer that is required by Code. If
you expand to the east you would be in someone’s yard. If you expand to the north you
are in the active space that is required for the application. Expansion vertically is not
feasible because the height limitation is forty (40) feet. According to the developer it is
not practical to reduce the size of the individual dwelling units within the building;
therefore, the maximum number of units that could be constructed would be forty-eight
(48) units. A greater density would not be feasible for the property.
Mr. Hemmig stated that he noticed that on one of the bullets on the handout there is a
statement regarding height variance being permissible without a height variance for
height restriction, does that go to the Board of Adjustment? Responding to Mr.
Hemmig, Mrs. Townshend stated that it would go to the Board of Adjustment and it
would be a very difficult argument to achieve a height variance.
Mr. Nichols questioned with regards to the right-of-way, originally the right-of-ways were
sixty (60) feet then some of them dropped down to fifty (50) feet and now we are down
to forty-six (46) feet. Where do we stand on this issue? Responding to Mr. Nichols, Mr.
Berry stated that this was previously recorded as part of the Arbors Senior
Condominiums and is a recorded right-of-way.
Also responding to Mr. Nichols, Mr. Koenig stated that the right-of-way was reduced to
forty-six (46) feet for this project and was approved by City Council because waiver
requirements go to City Council for final approval.
Mrs. Townshend stated that Mr. Berry has done an analysis for density and has showed
you the site plan. Anything you recommend to City Council for approval, and is
approved, does not get tied to a Site Plan; however, in the RG-2 zoning district
apartments are a Conditional Use so you would have more flexibility to review the plan.
The RM-2 zoning district is capped at 8 dwelling units per acre and RG-2 does not.
What the applicant is demonstrating is they probably could not get much more than 11
units per acre and this is what they would like to do with the property.
Mr. Friedman opened a public hearing.
Mrs. Lisa Whiteman – 11 Pin Oak Drive – Stated that her concerns are basically that
this is her backyard. The easement that is the passage way for a road is her backyard
that they are talking about. When she bought this house, just like others, she bought it
with the intention that it would stay at the value she bought it or increase in value. She
is very afraid that with the implementation of these buildings, this in fact would not
happen. She knows that it is labeled Senior Way and you want to put up homes for
seniors or the intent is to put up homes for seniors; however, she has three major
concerns. First, is there guaranteed funding that this would be completed? She can
see by the description the mention that it is for senior housing and that there is a need
for it and that is apparent because she also teaches within the district and there is
senior housing that has started to be built between the corner of Route 8 and Saulsbury
Road that is now stopped. (Mr. Friedman interrupted to state that this is not for
Page 46
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 6
approval of senior housing; however, with the rezoning request it would not be required
to be senior housing).
Mrs. Whiteman further stated that if it was not going to be senior housing than she
would like to know if the rezoning was going to risk the dwellings being turned into
section 8 housing. Because if this happens she knows that the value of her home
would go down and she would have to share her back yard with whatever is going on.
Her other concern is if this does go up, is there a plan in force to fence it in or
structurally separate it from the neighborhoods that we paid a lot of money to move into
and we want to keep that value up. There would be extra traffic and noise and it is
already pretty loud on College Road.
Mr. Bruce Shamir – 23 Pin Oak Drive – Stated that he also has the same concerns as
his neighbor who just spoke. As he recalls, from the last public hearing that was held
on this application, that the right-of-way for the roadway in-between Emerald Point and
the Arbors was a restricted use right-of-way for fire vehicles and not for open traffic.
Responding to Mr. Shamir, Mrs. Townshend stated that this was to be dedicated as a
public street at the 2007 hearing.
Mr. Shamir further stated that this is his third time addressing this issue and each time it
has gotten smaller. If we keep delaying it maybe we will get it to single family housing
where he would like to keep it. He does not want to see this big structure in his
backyard. The argument he had the last time is that none of you live there. He has to
look at it all the time and you do not. As far as the traffic analysis adding forty-eight (48)
more units and trying to get out onto College Road during rush hour, it is not the easiest
task in the world. There was also mention with regards to garden apartments and if
your definition of garden apartments is the same as his, where he grew up it was two
stories is that still in fact? Responding to Mr. Shamir, Mrs. Townshend stated that with
regards to garden apartments, the primary issue relates to direct access to open space
so that it would not be surrounded by a parking lot and would allow for three stories with
a maximum height of forty (40) feet. The definition in the Code book for garden
apartments does not state the number of stories that is driven by bulk standards.
Mr. Richard McKee – 1021 W. State College Road – Stated that he is the owner of
the property to the east where this project is planned. He shares the sentiment of the
previous two speakers. If this is not going to be for senior housing that it was originally
planned to be then he would prefer it to be single family detached dwellings. His
second concern is the access road because of traffic. If you have ever tried to get out
onto College Road during rush hour traffic you cannot do it. He understands the desires
for a connecting road between the southern portion of Emerald Point and College Road;
however, he firmly believes that this must be an emergency use connector only and
should not be general public access 24/7. If it is kept that way, there is going to be
multiple accidents just waiting to happen and we already have enough of them.
Mr. Friedman read into record a letter received on January 19, 2010 from Mrs. Betsy
Duncan, 19 Pin Oak Drive who was unable to be at the meeting this evening.
“Unfortunately, I am unable to attend the hearing scheduled tonight, however, ask you
Page 47
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 7
take my concerns into consideration. As a resident of Hidden Oak Subdivision, I have
an interest in the rezoning of the above property. Per discussion with your office, I
understand the rezoning request would include single family homes as well as garden
apartments. This property is surrounded by single family homes, and we believe the
property should be consistent with the area. We are concerned with the adverse effects
an apartment building will have on our property values as well as to our neighborhood.
We knew when we bought our property there eventually would be construction;
however, we were confident our City would protect our neighborhood and would not
allow a building that would degrade, or be invasive, and overbearing. I understand the
rezoning is on the table tonight; however, I am asking that you take our concerns into
consideration and understand the surrounding properties are single family homes and
wish to preserve the integrity of our area that includes our property and personal values.
Thank you for your time and consideration.”
Mr. Friedman closed the public hearing after seeing no one else wishing to speak.
Mr. Paradee stated that he would like to allay what seems to be some concerns in the
room that this is going to somehow change dramatically what has already been
approved for this property. It is important for you to understand that this project is
already approved for 48 condominium units. The only reason that the developer is here
tonight is because he wants to change it from condominiums to apartments due to
changing market conditions. Condominium units are simply not marketable. The
developer is committed to keeping the building exactly the same with the same footprint
and number of units. Staff expressed some concern with the change in zoning that
theoretically there could be an increase in density. The developer is willing to go on
record and does hereby go on the record as committing that he will not change anything
about the building as it will not be section 8, any taller, and will be the same footprint
and same number of units.
Mr. Ashburn stated that he would like to reiterate that there are a lot of faces that have
seen this go from two buildings to one building because of market constraints. Prior to
us coming back this would not have been possible due to the fact of the different
Comprehensive Plan and now that the Comprehensive Plan has changed, it does
permit this change. He has spent a lot of money with architectural design on this
building and he has engineered this site for the second time. He would really like not to
have to spend any more additional money funds on a new architectural design. The
intent is to just be able to bring this back to you for Site Plan approval less the age
restriction. With the economic constraints with the aged qualified residents, they have a
higher rate of vacancy in this building and seniors are having less of an ability to be able
to pay a higher rent rate.
Mrs. Townshend stated that she would like to clarify a few things. When a number of
people who spoke asked some questions that are design oriented, those issues would
be taken up at a later date if the rezoning is approved and they come back with a
development application. In terms of the RG-2 (General Residence Zone), the
permitted uses are essentially one family residence uses and the things that are allowed
in that zone as well as garden apartments. Multiple dwellings which would be
Page 48
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 8
apartments that are not considered garden apartments would be a Conditional Use. In
some ways the RG-2 zoning classification has more restrictions such as not being able
to do townhouses and duplexes. The RM-2 zoning classification would allow for a wider
range of housing styles included townhouses and does cap the density.
Mr. Hemmig stated that Senior Way has been recorded as a dedicated street; however,
can this be changed with an application that comes back before this Commission?
Responding to Mr. Hemmig, Mrs. Townshend stated that the recordation can change in
the future as part of a future application.
Colonel Welsh stated that originally this was going to be the Ashburn Construction
Company, then it was going to be single family homes, and then senior apartments and
now it is a building. He has heard some of the neighbor’s concerns with what will
ultimately end up here and he can understand why they would have these concerns.
One of the things that bothers him is that you received approval for senior housing with
a three story building that was Conditional Use with R-8 zoning for single family homes.
Now you are asking to remove the only thing that allowed you to do that and that is the
fact that it was senior housing. If you had come to us and asked to build a three story
apartment building with R-8 zoning we would have never approved it. One side of this
building is bordered by a major artery known as State College Road and two of the
other sides of the building are single family homes. On the other side of the building
there is a small single story shopping center to the east. What you are talking about is
building a three story building so he can understand how the people who have invested
money in those homes are going to be upset.
Colonel Welsh further questioned if this were to be used for some other purpose, the
recordation of Senior Way from the development out to State College Road, does it
have to be designed the way it is or does it just have to be an access point?
Responding to Colonel Welsh, Mrs. Townshend stated that it would have to be an
access point because the site constraints made it what it is. Code requires that they
have two access points to a public street.
Mr. Hemmig questioned what the applicant would do if this was approved as an RM-2
zoning classification? Responding to Mr. Hemmig, Mr. Ashburn stated that honestly he
was not sure because of the fact that there are two stub streets there already, which
really limits him to how he can develop the property.
Mr. Tolbert questioned if it would be feasible to recommend tabling this application to
give the applicant time to get their thoughts together on this project? Responding to Mr.
Tolbert, Mr. Friedman stated that this application will move forward to City Council who
will make the final decision regarding zoning for the property.
Mr. Ashburn stated that the building, as it is, if we had kept it as a parking lot we could
have made it work as garden apartments. The public road as a public thoroughfare
sinks this project as it currently is.
Page 49
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 9
Colonel Welsh questioned what it is that drives the requirement for the roadway?
Responding to Colonel Welsh, Mr. Koenig stated that back in the planning of Emerald
Point of 150 units there was a requirement for access to two public streets. They have
a stub street that goes over to the back of Hidden Oakes and would connect into Hidden
Oakes if there ever was an extension of that development. There are environmental
constraints in this area and that connection will likely not happen. For the public
hearings for Emerald Point it was made very clear that this stub street would extend
across this property and he thought that the owner of this property who was not
Ashburn at that time was represented at those hearings. The alignment of this stub
street was not objected to by the property owner at that time. The developer of Emerald
Point picked the location of this stub street which from this developer’s standpoint has
constrained his property. The stub street was recorded prior to the purchase of this
property so the constraint has been there the entire time.
Mr. Hemmig questioned if Senior Way did not exist and you did not have to put a street
through there, how would that change what you could do with this property in its current
form or with an RM-2 zoning classification? Responding to Mr. Hemmig, Mr. Ashburn
stated that what that would allow them to do is be able to utilize more of the property. It
is a higher standard when you have to build to a street standard rather than just a
parking lot standard as you have different pavement widths and additional
requirements.
Mr. Hemmig stated that he feels that they do need to table this application because we
need to look at this street requirement and if it has to be built because he does not feel
that it is necessary. He feels that it was planned as a second entrance for Emerald
Point; however, Emerald Point has been there several years now. He also feels that the
developer needs to look at that if this street was not developed, how could they utilize
the land without going to a density higher than eight (8) units per acre and make it
feasible before we go forward with this application. It would seem that there are too
many problems with this that need to be addressed with this application and if we
approve it with this rezoning request then we are opening ourselves up to basically
anything because we have approved other things that then do not get built and gets
changed several times.
Mr. Hemmig moved to table Z-09-05 Lands of JNK, LLC located at 1051 College Road
until the next Planning Commission meeting and in the mean time he would like the
Planning Commission and Staff to discuss the requirement for the Senior Way Road
access and would make it incumbent upon the developer to come back and make a
good faith effort to figure out what they could do with this property within eight (8)
dwellings per acre restriction without the access road that would be more in keeping
with the neighboring properties of single family homes that surround this property,
seconded by Mr. Nichols and the motion was unanimously carried 8-0.
Mr. Ashburn questioned if this was something they could look at the economic feasibility
of keeping this property at its current zoning with the PND or senior option and
decrease the standards for the road and turn it more into a private driveway so that he
Page 50
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 10
does not have to scrap the architectural drawings and the money that he has spent on
them?
Responding to Mr. Ashburn, Mr. Hemmig stated that their problem is that it was planned
for a senior community, we thought that this was an appropriate development and would
be something that would fit within the neighborhood that would not be a possible
problematic situation. As an open apartment complex, it presents a more problematic
situation than a senior complex would. Additionally, when you open it up to any age
restriction then the density also becomes something that we look at a little more closely
than we would with a senior complex. We are looking at either keeping it as a senior
complex or reducing the density and at the same time making it something more
compatible with the neighborhood.
Mrs. Townshend stated that if Mr. Ashburn wishes to keep the rezoning at what it
currently is, he would need to request to withdraw the rezoning application if he feels
this is the most feasible solution and then submit a subsequent application.
A transcription of the testimony presented at the Planning Commission meeting on March 15,
2010 is below:
Colonel Welsh moved to lift from the table Z-09-05 Lands of JNK, LLC at 1051 College
Road, seconded by Mr. Baldwin and the motion was unanimously carried 6-0 with Mr.
Shomo, Mr. Hemmig and Mr. Ambruso absent.
Representatives: Mr. Jordan Ashburn, Ashburn Homes; and Mr. Douglas Berry,
Pennoni Associates.
Mrs. Townshend provided an update of the application.
Mr. Berry stated that this application was tabled on January 19, 2010 in order to allow
the developer some additional time to determine if the project would be feasible under
and RM-2 designation rather than the RG-2 requested designation with the
understanding that the College Road entrance and the public improvements between
that and the building would be removed. Since that meeting we have met with City Staff
and DelDOT to determine if the entrance could be removed at all and while we have
been directed that it can be moved, there is secondary EMS access that would have to
be addressed. In addition, there may be some improvements to the Emerald Point
entrance adjacent to McKee Road. While it will help to remove the entrance in the
public right-of-way, this project is economically feasible to the developer only under the
RG-2 Zoning designation. We ask that you consider the development density of 11.11
that was approved for the Arbors Senior Condominiums will not be jeopardized. They
would be proposing a new development with an equal or less development density than
that proposed under that application.
Colonel Welsh questioned what has been gained by the two months delay other than
your coordination with the City of Dover Planning Commission? Responding to Colonel
Welsh, Mr. Berry stated that they had the opportunity to meet with the City after the
Page 51
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 11
business meeting and DelDOT we did not meet with until three weeks after that and
then the snowstorm occurred so they had to wait an additional two weeks to have the
meeting so it was necessary that we table the application to tonight. DelDOT has stated
that the entrance can be removed and if that is the case, they have no jurisdiction over
entrance improvements to this subdivision because access would be entirely via a City
street and we would have to coordinate with the City to determine if any improvements
would be required.
Mrs. Townshend stated that one of the things that was discussed was eliminating
access off of College Road entirely and coming through Emerald Point. Their
discussion with DelDOT was to find out how they would feel about that. DelDOT
indicated because their access would be from a City street that they would not have any
requirements or objections to that.
Colonel Welsh questioned that access would be through Emerald Point only and
eliminating access off of College Road. Responding to Colonel Welsh, Mrs. Townshend
stated that yes it would be eliminating; however, having some type of emergency
access in the event of emergency apparatus.
Colonel Welsh questioned what Staff’s position would be on this issue? Responding to
Colonel Welsh, Mr. Koenig stated that Staff’s position at this point would be that they
would have to come back through the process because there is a recorded right-of-way
at this time that is undedicated; however, it would solve the transportation problem that
would possibly be created by additional development on College Road by eliminating
the access on College Road. The only problem is that it will place some additional
burdens on the entrance off of McKee Road and those improvements have not been
discussed publicly at a public hearing so we do not have any type of public comment at
this point.
Colonel Welsh further questioned what the status was for the application? Responding
to Colonel Welsh, Mrs. Townshend stated that what you are looking at now is whether
or not currently the zoning is R-8 and the request is to change it to RG-2. At one point
staff had suggested that RM-2 maybe more appropriate. You heard public testimony
about the rezoning at the January meeting and essentially, at this point, the applicant is
stating that they want to proceed forward with the RG-2 request and are not interested
in RM-2 zoning which would cap the density at eight (8) dwelling units per acre. They
have approximately eleven (11) dwelling units per acre under the Senior PND that they
have now. Senior Housing did not require rezoning what they want to be able to do is
lift the senior age restriction and build the same product; however, cannot do that in the
R-8 zoning district.
Mr. Ashburn stated that as a reminder with the RG-2 zoning it has some fairly restrictive
design criteria that you can place on this to make sure that we are doing what we say
we are going to do. Responding to Mr. Ashburn, Mrs. Townshend stated that you
cannot necessary hold him to anything that is promised this evening; however, because
in RG-2 apartments are a Conditional Use and not a permitted use you are able to place
conditions on that.
Page 52
Z-09-05 Lands of JNK, LLC
Report to City Council – April 12, 2010
Page 12
Colonel Welsh stated that he still had reservations on this because the original
application was for increased density as senior housing which was approved and no
action was ever taken on it. He realizes that there were some circumstances that drove
this; however, if we can eliminate one access point and keep the traffic level down on
Baltustrol Road then we can proceed forward.
Colonel Welsh moved to forward approval to City Council Z-09-05 Lands of JNK, LLC at
1051 College Road to RG-2 (General Residence Zone), seconded by Mr. Nichols and
the motion was unanimously carried 6-0 with Mr. Shomo, Mr. Hemmig and Mr. Ambruso
absent.
Page 53
City of Dover Application No.: Z-09-05
Department of Planning & Inspections
CPO RG-5
AD
O
R-8
R
OLL
EG
E IO
R-20 C
E
AR
C-2A
U
SQ
OLL
EG
M
PIN
E
CK
EE
O C
AK
Site
D RO
AD
R
IVE
RE
D
OA
K
DR
IV
E
ME
R IO R-10
RG-3
N RO OAKMONT D RI
VE
AD
D
OA
EKR
E
CR
S T
FO
RE
Plan Title: Lands of JNK, LLC Legend
Location: 1151 College Road
Plan Type: Rezoning Dover Parcels
Tax Parcel: ED-05-076.12-04-02.00-000
Zoning
Zoning: R-8 current, RG-2 proposed
Owner: JNK, LLC
Date: 12-13-09
0 190 380 760 Feet
«
Page 54
FINAL READING
CITY OF DOVER
PROPOSED ORDINANCE #2009-29
1 AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
2 CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
3 AT 1051 COLLEGE ROAD.
4 WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property within
5 the limits of the City of Dover; and
6 WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use of
7 property described below from R-8 (One Family Residence Zone) to RG-2 (General Residence
8 Zone).
9 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
10 DOVER, IN COUNCIL MET:
11 1. That from and after the passage and approval of this ordinance the Zoning Map and Zoning
12 Ordinance of the City of Dover have been amended by changing the zoning designation from
13 R-8 (Single Family Residence Zone) to RG-2 (General Residence Zone) on that property
14 located at 1051 College Road, consisting of 4.32+/- acres, less a street right-of-way area
15 consisting of 0.55+/- acres that divides the original tract into two (2) pieces, owned by
16 JNK, LLC.
17
18 ADOPTED: *
19 S:\ClerksOffice\Rezonings\2009\1051 College Road\Ordinance-1051 College Road-Final Rdg (revised02-23-2010).wpd
20 Actions History
21 April 12, 2010 - Proposed Public Hearing/Final Reading - Council
22 March 15, 2010 - Review - Planning Commission
23 February 22, 2010 - Public Hearing/Final Reading Rescheduled - Council
24 January 19, 2010 - Tabled by Planning Commission
25 January 11, 2010 - Public Hearing/Final Reading Rescheduled - Council
26 December 21, 2009 - Proposed Review - Planning Commission (canceled due to inclement weather)
27 November 23, 2009 - First Reading - Council
Page 55
UTILITY COMMITTEE
The Utility Committee Meeting was held on March 22, 2010 at 5:00 p.m. with Chairman Ruane
presiding. Members present were Mr. Hogan, Mr. McGiffin, and Mr. Snaman. Major Kosior was
absent. Mayor Carey was also present (arrived at 5:05).
AGENDA ADDITIONS/DELETIONS
Mr. McGiffin moved for approval of the agenda, seconded by Mr. Hogan and unanimously
carried.
Extension of Recycling Contract and Option for the Future
Mr. Anthony DePrima, City Manager, advised members that the City of Dover’s contract agreement
for curbside recycling with Delaware Solid Waste Authority (DSWA) expired on February 15, 2010.
He stated that bids were solicited for recycling services in the Fall of 2009 and that DSWA was not
the lowest bidder. He stated that $1.74 per pick up, which is based on 26 pick ups per year, per
account, was the lowest proposal the City received. He noted that, based on the fee of $1.74 and the
estimated number of average customers (7,740) per month, the cost to provide curbside recycling
services using a contractor is $350,158 for FY 2011. Mr. DePrima also noted that DSWA recently
informed the City of their intention to discontinue operating the trucks that pick up recyclables;
however, they have agreed to extend their contract from March 1, 2010 until June 30, 2010. He
stated that the existing price of $1 per pick up ($2.00 per month) per account will remain in effect
during this time and that the estimated cost to extend the program is $61,324.00.
It was Mr. DePrima’s feeling that recycling services could be provided by the City at a substantially
lower cost if the work force in this area were expanded by a maximum of four (4) new employees;
therefore, staff does not recommend awarding a contract to the lowest bidder. He advocated
continuing recycling service in the future, as it is supported by many residents and conserves landfill
space. Mr. DePrima also noted that Governor Jack Markell recently announced his intention to
propose legislation that would mandate recycling in Delaware and require municipalities to operate
under the new legislation by September 2011. He advised members that he is working with the
Controller/Treasurer, Mrs. Donna Mitchell, on preparing a detailed cost analysis for the City of
Dover to run its own recycling program. A side-by-side comparison will be provided to members
during their next meeting.
Staff recommended authorizing the City Manager to execute the contract extension with DSWA.
Mr. Ruane requested that, in addition to the cost analysis, staff also provide members with an outline
of the proposed recycling legislation during their next meeting.
Responding to Mr. Hogan, Mr. DePrima stated that some of the recycling fees collected by the State
will be used to establish grants and loans for municipalities. He also noted that the State of Delaware
will be required to give the existing recycling containers to municipalities and that the City has been
discussing the option of purchasing equipment from DSWA.
In response to Mr. Ruane, Mr. Scott Koenig, Public Services Manager/Director of Public Works,
stated that 85% percent of residents currently participate in the recycling program; however, the
program has not been extended to apartment complexes and parts of the downtown area did not
receive containers in the initial roll out.
Page 56
UTILITY COMMITTEE MEETING OF MARCH 22, 2010 PAGE 2
Referring to the Report on Recycle Tracking for FY 2010, Mr. Koenig stated that the City has
avoided $58,000 in landfill charges by operating the curbside recycling program and that 945 tons
were pure recycling.
Mr. McGiffin moved to recommend authorizing the City Manager to execute the addendum
for Curbside Recycling with the Delaware Solid Waste Authority, with the terms outlined in
the agreement (Attachment #1). The motion was seconded by Mr. Hogan and unanimously
carried.
Review of Utility Related CIP’s (Electric and Water/Wastewater)
Members were provided the Water/Wastewater Capital Investment Plan Project Tracking Report (as
of January 31, 2010) and Major CIP Project Reports for the General Fund, Community
Transportation and General Fund Street Funds, Water/Wastewater Improvement and Extension
Fund, and Electric Improvement and Extension Fund.
Mr. Anthony DePrima, City Manager, advised members that the City has recently resolved the water
loans. He also noted that a number of electric and water/wastewater projects have been started and
that great progress is being made.
With regards to the Inflow and Infiltration (I & I) Removal Project, Mr. Ronald Lunt, Public Utilities
Director, stated that the project is funded through the revolving loan fund and bids were previously
solicited; however, because the Davis-Bacon Federal Wage provision was not included in the
original contract, the City will have to re-bid the project. He explained that the bidding process will
be a minimum of three (3) months.
In response to Mr. Ruane, Mr. Lunt explained that the cost of the project is unknown until the City
receives the bid proposals, and it is anticipated that the cost of labor will increase; however, the
increase will be offset by savings and interest.
Mr. Hogan moved to recommend acceptance of the report, seconded by Mr. Snaman and
unanimously carried.
FY 2011 Five-Year Capital Investment Plan (CIP)
Members were provided the Five (5) Year Capital Investment Plan for FY 2011 (Attachment #2).
Mr. Anthony DePrima, City Manager, noted that new projects were highlighted in yellow.
Responding to Mr. Ruane, Mr. Ronald Lunt, Public Utilities Director, stated that most of the projects
listed in Wastewater Management were for pump stations and work on a force main that is 30-40
years old and has exceeded its life cycle. He stated that the City currently uses a program to evaluate
the lift stations. Mr. Lunt explained that the Master Plan did not discuss lift stations unless related
to capacity issues; therefore, the City is following the recommendations of staff.
In regards to the Electric Engineering Transmission Relay and Coordination Project, Mr. Lunt
advised members that, with the recent 69Kv system expansion, the City has experienced
mis-operations within the system. He stated that the system is extremely complex; therefore, the
Page 57
UTILITY COMMITTEE MEETING OF MARCH 22, 2010 PAGE 3
City has neither the equipment nor resources to review the settings to rectify the problems in-house.
Mr. Lunt explained that staff proposes hiring an outside firm to review each relay so that the problem
may be resolved.
Responding to Mr. Snaman, Mr. Lunt stated that there are two (2) facets associated with the cost of
the project, including purchasing an internal program to review impedances (less than half of the
expense), and hiring a contractor to examine each wire and relay setting. He stated that it is
anticipated that the project will take at least one (1) year to complete.
In response to Mr. Ruane, Mrs. Donna Mitchell, Controller/Treasurer, stated that Capital
Improvement Plan (CIP) assumptions and rate structures have been operated through financial
models that have been used in the past. She noted that the model is lacking the departmental budget
for Fiscal Year 2011. Mrs. Mitchell explained that these improvements were originally modeled at
$3M and are now being modeled at $4M, due to the addition of projects. As a result, Operating
Funds have been transferred to Capital Funds. Mrs. Mitchell also noted that funds were transferred
from the Operating Fund to the Improvement and Extension fund for Plant Engineering and
Transmission and Distribution (T&D) projects. Mrs. Mitchell advised members that there are
sufficient funds in the Operating Fund; therefore, the City is able to transfer $4M without financing.
Mr. DePrima advised members that a life study analysis was conducted on units 1, 2, and 3 of the
power plant and that the results of the study would be brought to the Committee at a later date.
Responding to Mr. Ruane, Mr. Lunt stated that the analysis examined the cost and the anticipated
revenue of the units. He explained that the revenue from the Capacity Market exceeds the expense
outlined. Mr. Lunt noted that the analysis included a 20-year projection and that the anticipated
revenues were favorable, especially on Unit 3. He stated that the term of the Capacity Market is
three (3) years; therefore, the City's revenue is known during the three (3) year period, and the
revenue for years four (4) and five (5) could be reasonably projected. However, he cautioned that,
due to the instability in the market, further projections are very difficult, and after five (5) years the
Capacity Market is based on assumption. Mr. Lunt stated that he was confident that the City would
receive compensation for generation far beyond three (3) years.
In response to Mr. Hogan, Mr. Lunt stated that, although Indian River has recently closed some of
their plants, it is unlikely that the City will increase operations due to the units’ inefficiency;
however, if the load were to expand, then operations would increase. He noted that the primary
purpose is to maintain capacity. Mr. Lunt advised members that the City is currently at 100% of the
available capacity payment. He stated that capacity payments are as follows:
FY 2010-2011 - $11.3M ($2.3M for units 1 and 2)
FY 2011-2012 - $6.9M ($1.3M for units 1 and 2)
FY 2010-2013 - $14M ($2.7M for units 1 and 2)
Mr. DePrima advised members that the new power plant was classified as a gas plant; therefore, the
City is exempt from performing a test that would have cost $500,000 in fuel.
Page 58
UTILITY COMMITTEE MEETING OF MARCH 22, 2010 PAGE 4
Mrs. Mitchell stated that the City has stressed to PACE the importance of ensuring that investments
provide a return. She noted that some projects were re-evaluated and scaled down for this reason.
Responding to Mr. Snaman, Mr. Lunt stated that the new gas power plant will be nearly twice as
efficient as the existing units. He noted that the heat rate on the existing units is 13,500 to
14,000 BTU/kWh and would be 7,200 BTU/kWh on the new plant. Mr. Lunt explained that the
current plant operates 2 percent of the time, and that the new plant would operate 40-50 percent of
the time. He noted that the operation of the plant would increase to 60 percent in the out years.
Mr. Lunt stated that it is anticipated that units 1 and 2 will eventually be retired.
Mr. Hogan moved to recommend acceptance of the FY 2011 Five-Year Capital Investment
Plan (CIP) report, seconded by Mr. Snaman and unanimously carried.
Mr. Hogan moved for adjournment, seconded by Mr. McGiffin and unanimously carried.
Meeting Adjourned at 5:52.
Respectfully submitted,
Eugene B. Ruane
Chairman
EBR/JS/ac/tm/rr
S:\PACKETS\2010\Council\04-12-2010\03-22-2010 UTILITY.wpd
Attachments
Attachment #1 - Addendum to Curbside Recycling Agreement with the Delaware Solid Waste Authority
Attachment #2 - FY 2011 Five-Year Capital Investment Plan (CIP)
Page 59
ATTACHMENT #1
Utility Committee Meeting of 03/22/10
Page 60
ATTACHMENT #2
Utility Committee Meeting of 03/22/10
City of Dover, Delaware New projects are highlighted
Fiscal 2011 Five-Year Capital Investment Plan
FY 11 thru FY 15
PROJECTS BY DEPARTMENT
Department Project# Priority FY 11 FY 12 FY 13 FY 14 FY 15 Total
Public Utilities-Wastewater Mg
Inflow/Infiltration Removal 11-WWW-02 2 900,000 1,000,000 1,279,400 1,600,000 1,600,000 6,379,400
SCADA Equipment Technology Upgrade 11-WWW-03 3 82,100 84,900 87,900 254,900
Del. State/Del. Tech Force Main Rerouting 11-WWW-04 4 286,500 286,500
Fox Hall Pump Station Replacement 11-WWW-05 5 375,900 375,900
Heatherfield Force Main Upgrade 11-WWW-06 6 229,200 229,200
Dover East Pump Station Abandonment & Sewer Line 11-WWW-08 7 40,000 213,800 253,800
Brandywine Pump Station Replacement 11-WWW-08-2 8 52,000 350,000 402,000
Lepore Road Pump Station Replacement 11-WWW-09 9 52,000 350,000 402,000
Miscellaneous Sewer System Improvements 11-WWW-10 1 35,000 37,000 39,000 41,000 43,000 195,000
Baltray Pump State Replacement 12-WWW-07 7 25,000 100,000 125,000
Dover Brook Gardens Pump Station Upgrade 12-WWW-08 8 15,000 50,000 65,000
Rolling Acres Pump Station Replacement 12-WWW-09 9 52,000 350,000 402,000
McKee Road Pump Station Communator Replacement 12-WWW-10 10 10,000 45,000 55,000
Hazlettville Road Interceptor 13-WWW-08 8 30,000 740,000 770,000
Delaware Tech Pump Station Replacement 13-WWW-09 9 52,000 440,000 492,000
Westover Pump Station and Force Main Upgrade 13-WWW-10 10 65,000 703,800 768,800
Lakeview Drive Pump Station Replacement 14-WWW-06 6 52,000 450,000 502,000
Silver Lake Pump Station Replacement 14-WWW-07 7 52,000 375,000 427,000
McKee Road Force Main Rerouting 15-WWW-05 5 15,000 15,000
Walker Woods Pump Station Replacement 15-WWW-06 6 52,000 52,000
Retreat Pump Station Replacement 15-WWW-07 7 52,000 52,000
US Rt. 113 Sanitary Sewer Extension 15-WWW-08 8 42,000 42,000
US 13 Pump Station Upgrade 15-WWW-09 9 200,000 200,000
Public Utilities-Wastewater Mg Total 2,052,700 2,137,700 2,098,300 3,628,800 2,829,000 12,746,500
Public Utilities-Water Mgmnt
Miscellaneous Distribution System Improvements 11-WWW-01 1 70,000 75,000 80,000 85,000 90,000 400,000
Wellhead Redevelopment Program 11-WWW-20 2 60,000 65,000 70,000 75,000 80,000 350,000
Water Quality Improvements 11-WWW-30 3 1,000,000 1,750,000 2,452,350 3,197,200 3,208,200 11,607,750
Piney Point Well 11-WWW-40 4 450,000 450,000
1.0 MG Elevated Water Storage Tower 12-WWW-04 4 2,390,000 2,390,000
Emergency Generators (Wells) 12-WWW-05 5 80,000 80,000 80,000 240,000
Water Treatment Plant Process Improvements 13-WWW-05 5 150,000 450,000 450,000 1,050,000
Future Columbia Well Installation 14-WWW-06-2 6 25,000 171,400 196,400
SCADA Equipment Technology Upgrade 15-WWW-06-1 6 80,000 80,000
Public Utilities-Water Mgmnt Total 1,580,000 4,360,000 2,832,350 3,912,200 4,079,600 16,764,150
GRAND TOTAL 3,632,700 6,497,700 4,930,650 7,541,000 6,908,600 29,510,650
Produced using the Plan-It Capital Planning Software 1
Page 61
City of Dover, Delaware
Fiscal 2011 Five-Year Capital Investment Plan
FY 11 thru FY 15
FUNDING SOURCE SUMMARY
Source FY 11 FY 12 FY 13 FY 14 FY 15 Total
W/WW Bond Financing 2,390,000 2,390,000
Water/Wastewater Fund 3,632,700 4,107,700 4,930,650 7,541,000 6,908,600 27,120,650
GRAND TOTAL 3,632,700 6,497,700 4,930,650 7,541,000 6,908,600 29,510,650
Produced using the Plan-It Capital Planning Software 2
Page 62
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-02
Useful Life Unknown
Project Name Inflow/Infiltration Removal Category Water/Wastewater
New Project: No Account Number: Priority 2
Time-Line:
Total Project Cost: $10,404,400
Description
This project will identify and correct areas in the sanitary sewer collection system that are deteriorating and allowing groundwater to enter the
sanitary sewer system through cracked pipes and/or joints. Video investigations of the lines will be performed in-house to determine the condition
of subject pipes which may help with the identification of sump pumps and other illicit connections to the system which will have to be removed
by individual property owners. In conjunction with the Water Quality Improvement Projects, sanitary sewer lines within the project areas will be
video inspected to determine main condition. A work plan will be developed based on the results of the investigation.
Justification
The wet weather experienced in 2003, highlighted the fact that we have an aging wastewater system that requires more attention to the condition of
the old pipe network and more monitoring of illicit connections to the system. Inflow and infiltration are problems that all customers pay for since
they are costs that are not assigned to an individual customer. Therefore, all customers are affected by expenses related to inflow and infiltration.
Delaying or eliminating this project will result in continued higher treatment charges for wastewater flow to Kent County than is necessary. In
addition, the reduction in available capacity in the City and county systems due to inflow and infiltration will reduce the capacity available for
future growth.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
2,425,000 Construction/Maintenance 900,000 1,000,000 1,279,400 1,600,000 1,600,000 6,379,400 1,600,000
Total Total 900,000 1,000,000 1,279,400 1,600,000 1,600,000 6,379,400 Total
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
2,425,000 Water/Wastewater Fund 900,000 1,000,000 1,279,400 1,600,000 1,600,000 6,379,400 1,600,000
Total Total 900,000 1,000,000 1,279,400 1,600,000 1,600,000 6,379,400 Total
Budget Impact/Other
The project will reduce the operating budget over time due to the reduction in costs for sewage treatment paid to Kent County. All savings are
cumulative. The wet weather which was experienced in 2003, exemplified the fact that the aging and deteriorating sanitary sewer system allows
groundwater and rain water to enter the system. This in turn results in higher treatment charges from Kent County. In FY 2004, the Kent County
Treatment Charge was approximately $89,000 greater than the Wastewater Adjustment Fee on average per month. In FY 2005, City Council
approved a $0.45/Tgal rate increase on the City’s sewer rate ($0.25/Tgal in FY 2005 and $0.20/Tgal in FY 2006) to compensate for this problem.
As a result of this increase, approximately $2.77 million has been transferred to the Wastewater Adjustment Fee fund, between FY 2006 and FY
2009, to reduce the deficit associated with this problem. Although this transfer is not continuing in FY 2010 it is critical to continue making
improvements on a regular and planned basis to improve the integrity of the wastewater system. Weather occurs in a cyclic fashion and
discrepancies between fees collected and charges received will likely happen again when groundwater and precipitation levels rise.
Produced using the Plan-It Capital Planning Software 3
Page 63
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-03
Useful Life Unknown
Project Name SCADA Equipment Technology Upgrade Category Water/Wastewater
New Project: No Account Number: Priority 3
Time-Line:
Total Project Cost: $484,800
Description
This project involves the replacement of antiquated and/or obsolete remote terminal units (RTUs) at sewage pumping stations with new up-to-date
serviceable SCADA equipment. Microwave radios, antennas, and enclosures would be upgraded as needed. The RTU and radio are the reporting
equipment for the SCADA system (Supervisory Control and Data Acquisition) which reports, on a constant basis, the status of alarms at the City's
pumping stations. The RTUs that are being replaced are outdated and unable to be repaired. Most of the equipment is installed in two steel cabinets
mounted outside and are corroding. The new equipment is installed within a single fiberglass NEMA 4 enclosure. This is an ongoing project that
started in FY 2008, and will be completed in FY 2013
Justification
Replace failing antiquated equipment with completely new alarm reporting equipment to provide reliable SCADA system reporting and to prevent
the need for costly non budgeted emergency repairs. Lack of alarms resulting in costly sewer backup claims. An RTU or radio failure would
provide no advance warning of a failure and could result in costly sewer backup claims or sewage overflows into waterways. Equipment would
become old, not supported, and obsolete. : Each Year: order equipment and construct cabinets and back-plates by December; complete installation
by June. Stations being completed in FY 2010: Schoolview Pump Station, Lakeview Pump Station, Dover Post Pump Station, Hunters Pointe
Pump Station, Silver Lake Pump Station and McKee Road Pump Station.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
229,900 Construction/Maintenance 15,500 16,000 16,600 48,100
Miscellaneous 66,600 68,900 71,300 206,800
Total
Total 82,100 84,900 87,900 254,900
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
229,900 Water/Wastewater Fund 82,100 84,900 87,900 254,900
Total Total 82,100 84,900 87,900 254,900
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 4
Page 64
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-04
Useful Life Unknown
Project Name Del. State/Del. Tech Force Main Rerouting Category Water/Wastewater
New Project: No Account Number: Priority 4
Time-Line:
Total Project Cost: $313,300
Description
This project was identified in the 2009 Wastewater Master Plan and the Kent County Central Transmission Bypass planning. It will reroute
approximately 2,750 linear feet of eight-inch force main exiting from the Delaware State University Pump Station. The new force main will
discharge into the upstream end of the new Rt. 13 Sanitary Sewer Interceptor at the end of West Rustic Lane. This project will entail the
installation of approximately 750 feet of new eight-inch force main. Due to the requirements of this project, it will also include the rerouting of the
Delaware Tech. force main through reverse flow utilizing the existing force main.
Justification
Rerouting the existing force main from the Delaware State University P/S will significantly reduce the total length of force main from the station
and will reroute flows to City of Dover infrastructure. Flows from the pump station will no longer discharge into Kent County Station #2,
however, the flows will deposit into the Kent County Central Transmission Bypass. This partially fulfills a city commitment made in FY 2003.
Delaying or eliminating this project would result in continued stress on downstream infrastructure
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
26,800 Construction/Maintenance 286,500 286,500
Total Total 286,500 286,500
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
26,800 Water/Wastewater Fund 286,500 286,500
Total Total 286,500 286,500
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 5
Page 65
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-05
Useful Life 20-25 years
Project Name Fox Hall Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: Priority 5
Time-Line:
Total Project Cost: $427,900
Description
This project will completely rehabilitate the wet well side of the pump station using the poly-triplex system liner. In addition, it will include the
replacement of the pump station to a wet well mounted package pump station. This station was constructed in 1971 and has exceeded its life
expectancy of 20-25 years
Justification
The wet well has deteriorated due to age and is subject to groundwater infiltration. This project was identified in the 2009 Wastewater Master
Plan. Replace the aged station to prevent the need for costly repairs to maintain operation. Delaying or eliminating this project will result in the
continued deterioration of the station and increased costs of Kent County treatment charges due to groundwater infiltration. Pump failure resulting
in a sewage spill into waterways or backup in a residence. Because of the age of the pump station, certain parts are no longer obtainable and
replacement of equipment is costly.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
52,000 Construction/Maintenance 375,900 375,900
Total Total 375,900 375,900
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
52,000 Water/Wastewater Fund 375,900 375,900
Total Total 375,900 375,900
Budget Impact/Other
This project will slightly reduce the operating budget by reducing inflow/infiltration into the wet well. Inflow/infiltration reduction equates to a
reduction in our treatment costs with Kent County due to a reduced quantity of flow.
Produced using the Plan-It Capital Planning Software 6
Page 66
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-06
Useful Life Unknown
Project Name Heatherfield Force Main Upgrade Category Water/Wastewater
New Project: No Account Number: Priority 6 --
Time-Line:
Total Project Cost: $269,200
Description
This project calls for replacement of approximately 1,200 linear feet of existing four-inch force main with six-inch force main and modifying the
pump station components to increase the capacity of the station to over 200 gallons per minute.
Justification
Upgrade the force main to meet the capacity requirements incurred by the previous extension and development of the collection basin. Pump
station overload may result in a sewage spill into waterways or backup in a residence. The capacity of the pumping station was exceeded with the
connection of the Heatherfield East, Cranberry Run, and a portion of Fox Hall West Addition subdivisions. The current capacity utilization is 125
percent. The force main improvements will lower the utilization to 75 percent. The force main upgrade needs to be completed prior to replacement
of the aged station in the upcoming out years.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
40,000 Construction/Maintenance 229,200 229,200
Total Total 229,200 229,200
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
40,000 Water/Wastewater Fund 229,200 229,200
Total Total 229,200 229,200
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 7
Page 67
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-08
Useful Life Unknown
Project Name Dover East Pump Station Abandonment & Sewer Line Category Water/Wastewater
New Project: No Account Number: Priority 7 --
Time-Line:
Total Project Cost: $253,800
Description
The proposed project includes the abandonment and removal of the existing Smith & Loveless package capsular pumping station. This scope of
work will also include the removal of the existing wet well. The station will be eliminated due to the construction to occur on the Rojan Meadows
Subdivision site. East Dover MHP will connect to the new Rojan Meadows pump station by installing approximately 400 lf of 12” gravity sanitary
sewer. The existing Dover East station has exceeded its anticipated life expectancy of 20-25 years and the removal of this station can be justified
because of the pump station being constructed at the Rojan Meadows Subdivision site. The pump station at Rojan Meadows will be sized to
handle the Dover East wastewater and will discharge directly into the Central Transmission Bypass
Justification
The removal of the existing pump station will prevent the need for maintenance, and costly repairs to the system. The gravity sanitary sewer line
will be beneficial to the City of Dover because of the low maintenance costs compared to the costs of maintaining and operating the existing pump
station. Consequences of delaying or eliminating this project include the maintenance and expense for operating a station that is no longer
required. This station was installed with the development of the East Dover Mobile Home Park in 1973.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 40,000 40,000
Construction/Maintenance 213,800 213,800
Total 40,000 213,800 253,800
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 40,000 213,800 253,800
Total 40,000 213,800 253,800
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 8
Page 68
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-08-2
Useful Life
Project Name Brandywine Pump Station Replacement Category Water/Wastewater
New Project: Account Number: Priority 8 --
Time-Line:
Total Project Cost: $402,000
Description
The proposed project includes the replacement of the Smith & Loveless package pumping station installed in 1977. The station has exceeded its
life anticipated expectancy of 20-25 years and is in need of a capacity upgrade due to the increased growth in the basin
Justification
Replace the aged station with a completely new station to prevent the need for costly non budgeted repairs to maintain operation. Consequences of
delaying or elminating this project could inlcude pump failure resulting in a sewage spill into waterways or backup in a residence. Because of the
age of the pump station, certain parts are no longer obtainable, and replacement of equipment is costly. Design and bid in FY 2011; construction in
FY 2012.
This station was installed for the Dover Country Club Apartments when City sewer was made available to this area. The site was previously
outside the City's service area and had its own on site sewer treatment system. Over the life span of this station, it has seen increased flows with the
construction of Mallard Pond, Marsh Creek, and Westwind Meadows, and the extension of service to Fox Hall Drive and possible infiltration.
Based on the monthly runtime hours, the station is currently operating at 130 percent of desired capacity. Staff has observed numerous pump clogs
and failures in the past years. The Dover Country Club and Brandywine Condo sewer lines are old and possibly influenced by infiltration.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 52,000 52,000
Construction/Maintenance 350,000 350,000
Total 52,000 350,000 402,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 52,000 350,000 402,000
Total 52,000 350,000 402,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 9
Page 69
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-09
Useful Life Unknown
Project Name Lepore Road Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: Priority 9 --
Time-Line:
Total Project Cost: $402,000
Description
A replacement of this station was identified in the 2009 Wastewater Master Plan, and the current proposal is to completely replace the aging station
with a new Smith & Loveless Station.
Justification
The existing pumps are oversized and inefficient. Therefore, new pumps will be sized for the correct capacity of the wet well. The brick wet well is
subject to the groundwater infiltration. Delaying or eliminating this project would result in the continued deterioration of the infrastructure
necessitating the need for more extensive repairs in the future. Delaying or eliminating this project would result in the continued deterioration of
the infrastructure necessitating the need for more extensive repairs in the future.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 52,000 52,000
Construction/Maintenance 350,000 350,000
Total 52,000 350,000 402,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 52,000 350,000 402,000
Total 52,000 350,000 402,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 10
Page 70
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-10
Useful Life Unknown
Project Name Miscellaneous Sewer System Improvements Category Water/Wastewater
New Project: Account Number: Priority 1
Time-Line:
Total Project Cost: $414,500
Description
This project will primarily address emergency sanitary sewer infrastructure repairs including sanitary sewer mains and laterals within major
roadways, major pump station and force main failures and associated appurtenances. These funds can also be used to partner with private
developers to oversize future mains or to install associated improvements to meet the long term goals of the utility.
Justification
Due to the age of the sanitary sewer system, it can be expected that system failures will occur resulting in capital expenses to repair or replace the
failed component(s). In addition, missing opportunities to oversize or reroute mains will result in higher construction costs in the future. Delaying
or eliminating this project would result in reduced ability to properly address system failures and missed opportunities to expand the system. This
is an ongoing annual program. Emergency repairs are addressed as they occur. Emergency repairs are performed by private contractors or in-house
crews as dictated by the scope of work. All costs for over sizing will be paid through negotiated cost and public utilities agreements.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
174,500 Construction/Maintenance 35,000 37,000 39,000 41,000 43,000 195,000 45,000
Total Total 35,000 37,000 39,000 41,000 43,000 195,000 Total
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
174,500 Water/Wastewater Fund 35,000 37,000 39,000 41,000 43,000 195,000 45,000
Total Total 35,000 37,000 39,000 41,000 43,000 195,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 11
Page 71
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-WWW-07
Useful Life Unknown
Project Name Baltray Pump State Replacement Category Water/Wastewater
New Project: No Account Number: Priority 7 --
Time-Line:
Total Project Cost: $125,000
Description
The proposed project includes the in kind replacement of the grinder pumping station installed with the construction of the Baltray Subdivision in
1988. The station is approaching its anticipated life expectancy of 20-25 years. The grinder pumps, rail system, and electric controls will be
replaced.
Justification
Replace the aging station with a completely new station to prevent the need for costly non budgeted repairs to maintain operation. Pump failure
resulting in a sewage spill into waterways or backup in a residence. Because of the age of the pump station, certain parts are no longer obtainable,
and replacement of equipment is costly. Grinder pumps require periodic repairs and replacement to maintain efficient operation. During previous
pump removal, staff has noticed leaking seals and instability in the rail system for the pumps due to corrosion. Although grinder pumps are less
costly than standard pumps used elsewhere, they are only appropriate under certain conditions. As a grinder pump is still effective at this location,
it will be replaced in kind.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 25,000 25,000
Construction/Maintenance 100,000 100,000
Total 25,000 100,000 125,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 25,000 100,000 125,000
Total 25,000 100,000 125,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 12
Page 72
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-WWW-08
Useful Life Unknown
Project Name Dover Brook Gardens Pump Station Upgrade Category Water/Wastewater
New Project: No Account Number: Priority 8 --
Time-Line:
Total Project Cost: $65,000
Description
This project would construct a force main priming loop to insure that adequate back pressure is provided to the check valves to maintain prime on
the vacuum primed Smith & Loveless pumps and upgrade to maintain or increase capacity. The loop is to create a high point in the force main
above the pumps to provide a column of water against the check valves. The existing force main was originally installed with a constant slope
away from the station to the receiving gravity sewer manhole. The force main drains by gravity away from the check valves providing very little
static water pressure to hold check valves closed.
Justification
Reduce maintenance time of cleaning check valves weekly and on-call or overtime pay when the pumps lose prime. Pump prime failure could
result in a sewage spill into waterways or backup in a residence. Staff has observed numerous high wet well alarms due to pump loss of prime.
Construction to be provided by in-house crew.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 15,000 15,000
Construction/Maintenance 50,000 50,000
Total 15,000 50,000 65,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 15,000 50,000 65,000
Total 15,000 50,000 65,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 13
Page 73
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-WWW-09
Useful Life Unknown
Project Name Rolling Acres Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: Priority 9 --
Time-Line:
Total Project Cost: $402,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1973 in order to handle the commercial areas from
Harrington Realty Shopping Center to the Howard Johnson Hotel. The station has exceeded its life anticipated expectancy of 20-25 years and is in
need of a capacity upgrade due to the high peak inflow rates.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation. Pump failure
resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable, and
replacement of equipment is costly. This station experiences periods of high inflow rates due to the hotel occupancy and is susceptible to possible
inflow/infiltration. Staff has observed numerous pump high wet well alarms due to high inflows and increased runtimes during wet months.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 52,000 52,000
Construction/Maintenance 350,000 350,000
Total 52,000 350,000 402,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 52,000 350,000 402,000
Total 52,000 350,000 402,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 14
Page 74
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-WWW-10
Useful Life Unknown
Project Name McKee Road Pump Station Communator Replacement Category Water/Wastewater
New Project: No Account Number: Priority 10 --
Time-Line:
Total Project Cost: $55,000
Description
The proposed project includes the replacement of the communator at the influent line to the pumping station installed in 1995. This acts as a
screen/grinder at the influent side of the station, cutting or stopping large debris from entering the wet well and clogging the pumps. The
communator motor has run 24/7 since the initial startup of the pumping station.
Justification
Replace the aging equipment to prevent the need for costly unbudgeted repairs to maintain operation. Unbudgeted costly repairs to communator
and damage to a pump when failure occurs. Pump failure resulting in a sewage spill into waterway or backup in a residence. Due to the age of the
station, certain parts are no longer obtainable, and replacement of equipment is costly
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 10,000 10,000
Construction/Maintenance 45,000 45,000
Total 10,000 45,000 55,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 10,000 45,000 55,000
Total 10,000 45,000 55,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 15
Page 75
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 13-WWW-08
Useful Life Unknown
Project Name Hazlettville Road Interceptor Category Water/Wastewater
New Project: Yes Account Number: Priority 8 --
Time-Line:
Total Project Cost: $770,000
Description
This project, identified in the 2009 Wastewater Master Plan, identified sections of 15” gravity wastewater main as being overloaded in peak
conditions, due to a negative slope in the pipe. This project calls for the upgrade of roughly 1,320 linear feet of wastewater main. The proposed
upgrade will install 21” main at proper slope to provide adequate capacity and allow for future growth in the basin.
Justification
This project has been identified by staff that the section of pipes is flowing nearly full, due to negative slope. This project will allow for proper
capacity to handle current flow as well to allow for growth. Delaying or eliminating this project would result in overflow of wastewater material. In-
house design in FY 2013; construction in FY 2014.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 30,000 30,000
Construction/Maintenance 740,000 740,000
Total 30,000 740,000 770,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 30,000 740,000 770,000
Total 30,000 740,000 770,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 16
Page 76
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 13-WWW-09
Useful Life Unknown
Project Name Delaware Tech Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: Priority 9 --
Time-Line:
Total Project Cost: $492,000
Description
The proposed project includes the replacement of the Smith & Loveless package capsular pumping station and wet well replacement/relocation
installed in 1975. The below-grade capsular station will be replaced with a wet well mounted package pumping station eliminating a confined
space entry requirement. The station is located at the rear of the Delaware Tech campus on the corner of Scarborough Road and Crawford Carroll
Avenue. The station has exceeded its anticipated life expectancy of 20-25 years.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation. Pump failure
resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable, and
replacement of equipment is costly. This station was installed by Kent County to serve the Delaware Tech and Delaware State University campuses
in the mid 1970s and transferred to the City in the late 1990s. The pumping station handles the Delaware Tech Terry Campus complex. Design and
bid in FY 2013; construction in FY 2014.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 52,000 52,000
Construction/Maintenance 440,000 440,000
Total 52,000 440,000 492,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 52,000 440,000 492,000
Total 52,000 440,000 492,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 17
Page 77
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 13-WWW-10
Useful Life Unknown
Project Name Westover Pump Station and Force Main Upgrade Category Water/Wastewater
New Project: No Account Number: Priority 10 --
Time-Line:
Total Project Cost: $768,800
Description
The proposed project includes the upgrade of the Smith & Loveless pumping station and force main installed in 1994. The pump station's available
capacity will be consumed with the build out of the Village of Cannon Mills and will be in need of additional capacity in order to be able receive
additional flow from the west. The project will include replacement of interior six-inch suction and discharge piping with eight-inch pipe, upgrade
1,400 feet of six-inch force main to 12-inch diameter pipe from the station to Electric Avenue.
Justification
Provide adequate capacity to receive additional sewage flow from the immediate vicinity due to development and annexation. Possible pipe rupture
due to high head pressures and water hammer. A rupture could cause the station to flood, damaging the motors and controls or spilling raw sewage
into the Puncheon Run stream. Design and bid in FY 2013; construction in FY 2014.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 65,000 65,000
Construction/Maintenance 703,800 703,800
Total 65,000 703,800 768,800
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 65,000 703,800 768,800
Total 65,000 703,800 768,800
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 18
Page 78
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 14-WWW-06
Useful Life Unknown
Project Name Lakeview Drive Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: Priority 6 --
Time-Line:
Total Project Cost: $502,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1971. The station has exceeded its life anticipated
expectancy of 20-25 years and is need of a capacity upgrade due to high peak inflow rates.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation. Pump failure
resulting in a sewage spill into waterway or backup in a residence. Due to the age of the station, certain parts are no longer obtainable and
replacement of equipment is costly. Design and bid in FY 2014; construction in FY 2015. This station is located within the roadway of Lakeview
Drive. The design portion of this project is to address the relocation of this station.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 52,000 52,000
Construction/Maintenance 450,000 450,000
Total 52,000 450,000 502,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 52,000 450,000 502,000
Total 52,000 450,000 502,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 19
Page 79
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 14-WWW-07
Useful Life Unknown
Project Name Silver Lake Pump Station Replacement Category Water/Wastewater
New Project: No Account Number: Priority 7 --
Time-Line:
Total Project Cost: $427,000
Description
This project calls for replacement of the Smith & Loveless package pumping station installed in 1982 in order to handle development in the area,
as well as completely rehabilitate the wet well side of the pump station using the poly-triplex system liner. The station has exceeded its life
expectancy of 20-25 years and is in need of a capacity upgrade to handle anticipated growth in the basin.
Justification
Replace the aged station with a completely new station to prevent the need for costly unbudgeted repairs to maintain operation. The wet well has
deteriorated due to age and is subject to groundwater infiltration. Pump failure resulting in a sewage spill into waterways or backup in a residence.
Because of the age of the pump station, certain parts are no longer obtainable and replacement of equipment is costly. Design and bid in FY 2014;
construction in FY 2015.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 52,000 52,000
Construction/Maintenance 375,000 375,000
Total 52,000 375,000 427,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 52,000 375,000 427,000
Total 52,000 375,000 427,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 20
Page 80
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-WWW-05
Useful Life Unknown
Project Name McKee Road Force Main Rerouting Category Water/Wastewater
New Project: Yes Account Number: Priority 5
Time-Line:
Total Project Cost: $65,000
Description
This project was identified in the 2009 Wastewater Master Plan and will reroute approximately 200 linear feet of existing force main from Kent
County Pump Station #2 to the Kent County Central Transmission Bypass line, which will eventually flow into the Route 13 Sanitary Sewer
Interceptor.
Justification
Rerouting the McKee force main will reroute flows to the City of Dover infrastructure. Flows from the McKee Road Pump Station will no longer
discharge into Kent County Pump Station #2. Delaying or eliminating this project would result in continued stress on downstream infrastructure.
Route 13 Sewer Interceptor, Delaware State University/Delaware Tech. Force Main Reroute, Kent County Central Transmission Bypass. Design in
FY 2015; construction in FY 2016.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 15,000 15,000 50,000
Total 15,000 15,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Water/Wastewater Fund 15,000 15,000 50,000
Total 15,000 15,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 21
Page 81
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-WWW-06
Useful Life Unknown
Project Name Walker Woods Pump Station Replacement Category Water/Wastewater
New Project: Yes Account Number: Priority 6 --
Time-Line:
Total Project Cost: $402,000
Description
The proposed project includes the replacement of the Smith & Loveless package pumping station installed in 1989. The station has exceeded its
life expectancy of 20-25 years and is in need of a capacity upgrade due to the increased growth in the basin.
Justification
Replace the aged station with a completely new station to prevent the need for costly non budgeted repairs to maintain operation. Pump failure
resulting in a sewage spill into waterways or backup in a residence. Because of the age of the pump station, certain parts are no longer obtainable
and replacement of equipment is costly. Design in FY 2015; construction in FY 2016.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 52,000 52,000 350,000
Total 52,000 52,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Water/Wastewater Fund 52,000 52,000 350,000
Total 52,000 52,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 22
Page 82
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-WWW-07
Useful Life Unknown
Project Name Retreat Pump Station Replacement Category Water/Wastewater
New Project: Yes Account Number: Priority 7 --
Time-Line:
Total Project Cost: $402,000
Description
The proposed project includes the replacement of the Smith & Loveless package pumping station installed in 1978. The station has exceeded its
life expectancy of 20-25 years and is in need of a capacity upgrade due to the increased growth in the basin.
Justification
Replace the aged station with a completely new station to prevent the need for costly non budgeted repairs to maintain operation. Pump failure
resulting in a sewage spill into waterways or backup in a residence. Because of the age of the pump station, certain parts are no longer obtainable
and replacement of equipment is costly. Design in FY 2015; construction in FY 2016.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 52,000 52,000 350,000
Total 52,000 52,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Water/Wastewater Fund 52,000 52,000 350,000
Total 52,000 52,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 23
Page 83
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-WWW-08
Useful Life Unknown
Project Name US Rt. 113 Sanitary Sewer Extension Category Water/Wastewater
New Project: Yes Account Number: Priority 8 --
Time-Line:
Total Project Cost: $897,000
Description
This project will entail the installation of 1500 linear feet of ten-inch gravity sewer main. This will eliminate the need for the force main that is
currently in Route 113.
Justification
The growth of the area determines that a gravity sewer main is needed for proper infrastructure utilization. The current force main will not be able
to handle the projected load. Delaying or eliminating this project would result in continued stress on downstream infrastructure. Design in FY
2015; construction in FY 2016.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 42,000 42,000 855,000
Total 42,000 42,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Water/Wastewater Fund 42,000 42,000 855,000
Total 42,000 42,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 24
Page 84
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Wastewater M
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-WWW-09
Useful Life Unknown
Project Name US 13 Pump Station Upgrade Category Water/Wastewater
New Project: Yes Account Number: Priority 9 --
Time-Line:
Total Project Cost: $1,200,000
Description
This project will entail the upgrade to the existing pump station. Parts that are anticipated for upgrade include, but are not limited to, controls,
internal piping and pumps. Additionally, a structural relining application will be needed on the wet well.
Justification
Upgrading the aged station with new parts to prevent the need for costly non budgeted repairs to maintain operation. Consequences of delaying or
eliminating this project could cause pump failure resulting in a sewage spill into waterways or backup in a residence. Due to the increased flows
directed to this station through the Route 13 Interceptor, Delaware State University/Delaware Tech. Force Main Reroute and McKee Force Main
Routing, upgrading this station is imperative to avoid sewer overflows.Design in FY 2015; construction in FY 2016
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 200,000 200,000 1,000,000
Total 200,000 200,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Water/Wastewater Fund 200,000 200,000 1,000,000
Total 200,000 200,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 25
Page 85
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-01
Useful Life Unknown
Project Name Miscellaneous Distribution System Improvements Category Water/Wastewater
New Project: No Account Number: Priority 1
Time-Line:
Total Project Cost: $953,948
Description
This project will primarily address emergency distribution system infrastructure repairs including water mains and services within major roadways
and associated appurtenances. This project will also install improvements identified by the flushing program such as valve insertions and hydrant
installations. These funds can also be used to partner with private developers to oversize future mains or to install associated improvements to
meet the long term goals of the utility.
Justification
Due to the age of the water system, it can be expected that system failures will occur resulting in capital expenses to repair or replace the failed
component(s). Implementing improvements identified by the flushing program will aide in improved operational control of the system. In
addition, missing opportunities to oversize or reroute mains will result in higher construction costs in the future. Delaying or eliminating this
project would result in reduced ability to properly address system failures and missed opportunities to expand the distribution system. This is an
ongoing annual program. Emergency repairs are addressed as they occur. Emergency repairs are performed by private contractors or in-house
crews as dictated by the scope of work. All costs for over sizing will be paid through negotiated cost and public utilities agreements.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
458,948 Construction/Maintenance 70,000 75,000 80,000 85,000 90,000 400,000 95,000
Total Total 70,000 75,000 80,000 85,000 90,000 400,000 Total
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
458,948 Water/Wastewater Fund 70,000 75,000 80,000 85,000 90,000 400,000 95,000
Total Total 70,000 75,000 80,000 85,000 90,000 400,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 26
Page 86
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-20
Useful Life Unknown
Project Name Wellhead Redevelopment Program Category Water/Wastewater
New Project: No Account Number: Priority 2
Time-Line:
Total Project Cost: $770,962
Description
This project will provide for rehabilitation and repair of each deep wellhead in an effort to maintain operations and/or increase the yield of each
well as it relates to the permitted allocation.
Justification
The well screening and gravel pack requires cleaning over time due to a buildup of mineral deposits and foreign materials such as clay and silt.
This maintenance effort is critical to ensure that production can continue to meet demand. It is also necessary to maintain the operational aspects of
each well and provide repairs as needed to minimize downtime to maintain system capacity. Delaying or eliminating this project would result in the
continued deterioration of the well screen, gravel pack, and well yield over time. It would also result in increased well downtime, emergency
repairs, and decreased capacity. These issues can lead to increased flow pattern changes and water quality concerns. Improved operating
efficiencies at the wellhead will slightly reduce power costs, but this savings has not been quantified. FY 2008; total well inspection and testing
performed. FY 2009: Motors at Wells #6A and #9 were rebuilt, and wells #13R and #15 were redeveloped. FY 2010: Well #10. FY 2011:
Well #4 redevelopment and well piping improvements at various well locations.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 60,000 65,000 70,000 75,000 80,000 350,000
Total 60,000 65,000 70,000 75,000 80,000 350,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 60,000 65,000 70,000 75,000 80,000 350,000
Total 60,000 65,000 70,000 75,000 80,000 350,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 27
Page 87
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-30
Useful Life Unknown
Project Name Water Quality Improvements Category Water/Wastewater
New Project: No Account Number: Priority 3
Time-Line:
Total Project Cost: $11,607,750
Description
This project was first identified by staff and the 2006 Water Master Plan Update, and has since become further refined with the FY 2006 Water
Quality Evaluation. Projects to be included under this category primarily consist of replacement or relining of old unlined cast iron water main
within the City’s water distribution system; system upgrades to improve system control; and utilization of a consultant to provide additional design
and evaluation services, as needed. Recent research and data collections have produced a Water Main Rehabilitation Priority List, based on
several criterions to identify water mains that are in need of replacement or relining. Pipes will be upgraded according to the severity of the pipe
condition, as well as coordination with the City of Dover’s Public Services Street Rehabilitation Program.
In FY 2008 and FY 2009, the deep well contact chamber designs were completed and installed completed. Water mains have been replaced over
this time frame in Washington Street, Pennsylvania Avenue, South Street and Pear Street. Operational efforts, such as flushing, will occur on a
continuous basis. As part of the Water Main Rehabilitation Priority List, water lines were identified throughout the City that requires
replacement/relining. Using this as a guide the following water line rehabilitation projects are scheduled for FY 2011: Walker Road (phase 1
construction), Columbia Avenue Design, William Street Design, Ross Street Design, and West Street West Alley Design.
Justification
Water quality complaints have eroded consumer confidence in the City’s water supply as the water is perceived to be aesthetically unpleasant. In
order to reduce complaints and potentially alleviate this problem, it is necessary to implement the improvements identified by staff, the 2006 Water
Master Plan Update, and the FY 2006 Water Quality Evaluation. Delaying or eliminating this project will prolong customer dissatisfaction and
further erode confidence in the City’s water supply. In addition, main rehabilitation and replacement, ensuring pipes do not significantly exceed
the expected life cycle, is critical to provide a reliable supply of water for our customers and for fire suppression. Water leaks and breaks on older
lines can have a significant impact on our ability to serve over time.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 70,000 90,000 385,000 300,000 380,000 1,225,000
Construction/Maintenance 930,000 1,660,000 2,067,350 2,897,200 2,828,200 10,382,750
Total 1,000,000 1,750,000 2,452,350 3,197,200 3,208,200 11,607,750
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 1,000,000 1,750,000 2,452,350 3,197,200 3,208,200 11,607,750
Total 1,000,000 1,750,000 2,452,350 3,197,200 3,208,200 11,607,750
Budget Impact/Other
Addressing the brown water and associated water quality concerns of the City’s water system will not only require capital improvements to the
system but also operational changes. Some operation changes will result in no net effect on the operating budget, while others will need to be
addressed in the development of future operating budgets. Such items include tools and supplies necessary to improve system sampling and
monitoring as well as tools and supplies necessary to improve system-wide flushing operations.
Produced using the Plan-It Capital Planning Software 28
Page 88
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-WWW-40
Useful Life Unknown
Project Name Piney Point Well Category Water/Wastewater
New Project: Account Number: Priority 4
Time-Line:
Total Project Cost: $645,000
Description
This project, identified by staff and confirmed by the 2006 Water Master Plan Update, proposes the drilling of a new Piney Point Aquifer
Production Well to increase production capacity up to our current permitted allocation as well as increase system pressure and stabilize the
chlorine residuals of the City.
Justification
A reduction in long-term yield from our Piney Point Well is causing a greater reliance on our more costly aquifers. Delaying or eliminating this
project would result in the continued reduction in our production capabilities under our permitted allocation, as well as our ability to meet
projected demand increases. Planning is proposed for FY 2009. Design and site procurement are planned for FY 2010. Construction to be
completed in FY 2011. The specific location of a proposed wellhead has not been determined at this time. The yield from a new production well
may allow us to abandon some of our poorly performing wells. Costs identified in the 2006 Water Master Plan Update have been increased based
upon 3.5 percent per year.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
195,000 Construction/Maintenance 450,000 450,000
Total Total 450,000 450,000
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
195,000 Water/Wastewater Fund 450,000 450,000
Total Total 450,000 450,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 29
Page 89
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-WWW-04
Useful Life Unknown
Project Name 1.0 MG Elevated Water Storage Tower Category Water/Wastewater
New Project: Account Number: Priority 4
Time-Line:
Total Project Cost: $3,085,000
Description
The proposed project, identified by staff and confirmed by the 2006 Water Master Plan Update, will construct a new 1.0 million gallon elevated
storage tank within the distribution system.
Justification
This project was determined necessary by the 2006 Water Mater Plan Update in order to meet future storage volume requirements based upon
demands and to aid in reducing low pressure areas and enhance fire suppression capability. Delaying or eliminating this project will result in
preventing growth within the system, particularly, fire suppression measures will be compromised. Construction is planned for FY 2012. Original
project costs were provided in the 2006 Water Master Plan based upon 2005 dollars. Out-year costs have been increased by 3.5 percent per year.
The planning, site selection and land acquisition will be conducted with in-house staff, while contractual services will be required to assist with
design and construction
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
695,000 Construction/Maintenance 2,390,000 2,390,000
Total Total 2,390,000 2,390,000
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
695,000 W/WW Bond Financing 2,390,000 2,390,000
Total Total 2,390,000 2,390,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 30
Page 90
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 12-WWW-05
Useful Life Unknown
Project Name Emergency Generators (Wells) Category Water/Wastewater
New Project: No Account Number: Priority 5
Time-Line:
Total Project Cost: $240,000
Description
This project, identified in the 2006 Water Master Plan Update, would provide emergency generators for large production wells.
Justification
This project will provide emergency power to wells for continued water production and reliability in the event of power disruptions or other
emergencies. Portable or fixed generators are currently not available to most of the deep wells. The Water Treatment Plant is equipped with a fixed
generator. All generators purchased will be permanent fixtures at each site. Generator purchased in FY 2012 will support Well #2, FY 2013 will
support Well #6 and FY 2014 will support Well #10. Currently, a portable generator is stationed at Well #10, after installation of permanent
generator at Well #10; the portable generator will be used at medium sized production wells as needed
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 80,000 80,000 80,000 240,000
Total 80,000 80,000 80,000 240,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 80,000 80,000 80,000 240,000
Total 80,000 80,000 80,000 240,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 31
Page 91
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 13-WWW-05
Useful Life Unknown
Project Name Water Treatment Plant Process Improvements Category Water/Wastewater
New Project: Account Number: Priority 5
Time-Line:
Total Project Cost: $1,050,000
Description
This project, identified in the 2006 Water Master Plan Update, proposes process improvements to the existing Water Treatment Plant. Due to
limitations with the Ozone Contactors, the capacity at the Water Treatment Plant is limited to 4.0 Million Gallons per day, as opposed to 5.0
Million Gallons per day, as originally designed. A consultant will be utilized to determine the best means and improvements necessary to increase
the capacity. This project is to be performed in conjunction with the future Columbia Well installation.
Justification
Process improvements will allow for capacity enhancements as well as improved ability to meet regulatory requirements. Delaying or eliminating
this project can result in production capacity decreases, which could limit growth, and/or regulatory incompliance. Planning is proposed for FY
2013. Construction to begin in FY 2014.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 150,000 150,000
Construction/Maintenance 450,000 450,000 900,000
Total 150,000 450,000 450,000 1,050,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 150,000 450,000 450,000 1,050,000
Total 150,000 450,000 450,000 1,050,000
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 32
Page 92
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 14-WWW-06-2
Useful Life Unknown
Project Name Future Columbia Well Installation Category Water/Wastewater
New Project: Account Number: Priority 6 --
Time-Line:
Total Project Cost: $605,300
Description
This project, identified by staff and confirmed by the 2006 Water Master Plan Update, proposes the drilling of new shallow well to increase
production capacity at the Water Treatment Plant to design levels of 5.0 Million Gallons per Day. This project is to be completed in conjunction
with the Water Treatment Plant Process Improvements.
Justification
To meet increased water demand and fire suppression requirements. Delaying or eliminating this project would result in the continued reduction in
our production capabilities under our permitted allocation, as well as limiting the City’s growth. Planning is proposed for FY 2014. Design and site
procurement are planned for FY 2015. Construction to be completed in FY 2016. The specific location of a proposed wellhead has not been
determined at this time. The location will be selected in the planning and design phase. In addition, the yield from a new production well may
allow us to abandon some of our poorly performing wells. Costs identified in the 2006 Water Master Plan Update have been increased based upon
3.5 percent per year. Land costs are based upon the need of 1/2 acre of land for the project
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 25,000 98,800 123,800 408,900
Land Acquisition 72,600 72,600
Total
Total 25,000 171,400 196,400
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Water/Wastewater Fund 25,000 171,400 196,400 408,900
Total 25,000 171,400 196,400 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 33
Page 93
Fiscal 2011 Five-Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Water Mgmnt
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 15-WWW-06-1
Useful Life Unknown
Project Name SCADA Equipment Technology Upgrade Category Water/Wastewater
New Project: Account Number: Priority 6 --
Time-Line:
Total Project Cost: $240,000
Description
This project involves the replacement of antiquated and/or obsolete equipment related to the SCADA (Supervisory Control and Data Acquisition)
system, which controls water production. This equipment includes, but not limited to, Remote Telemetry Units (RTUs), Master Telemetry Unit
(MTU) and Radios. SCADA is used for reporting, on a constant basis, the status of the City of Dover’s water production wells as well as the
Water Treatment Plant. The equipment being replaced would be outdated, or unable to be repaired.
Justification
Replace failing and antiquated equipment to improve monitoring ability and system control to comply with regulatory and reporting requirements
and to prevent the need for costly non budgeted emergency repairs. Due to the age of some of the equipment, only used parts are available.
Consequences of delaying or eliminating this project are the lack of alarms regarding problems at water production wells and the water treatment
plant. Failures would provide no advance warnings of failures in the field at water production sites. It is estimated that upgrades will be made at
each of the deep well sites and to the master, as part of this program
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Miscellaneous 80,000 80,000 160,000
Total 80,000 80,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Water/Wastewater Fund 80,000 80,000 160,000
Total 80,000 80,000 Total
Budget Impact/Other
Produced using the Plan-It Capital Planning Software 34
Page 94
City of Dover, Delaware
Water/Wastewater - Vehicle Replacement Schedule
FY 11 thru FY 15
PROJECTS BY DEPARTMENT
Department Project# Priority FY 11 FY 12 FY 13 FY 14 FY 15 Total
Public Utilities-Wastewater Mg
2001 Dodge Pick Up Truck (661-2) 11Veh# 661-2 n/a 10,900 10,900
2002 Ford 1-Ton Utility Truck with Crane (664) 11Veh# 664 n/a 41,000 41,000
2001 Dodge Pick Up Truck (695-2) 11Veh# 695-2 n/a 10,900 10,900
2003 Chevrolet Pick-Up (655) 12Veh# 655 n/a 43,000 43,000
2002 Dodge Pick- Up (668-2) 12Veh# 668-2 n/a 15,850 15,850
2001 Dodge 1-Ton Utility Truck (680-2) 12Veh# 680-2 n/a 19,550 19,550
2000 Airman Air Compressor (683-2) 12Veh# 683-2 n/a 8,800 8,800
2002 Dodge Pick Up Truck (663-2) 13Veh# 663-2 n/a 16,650 16,650
2002 Sterling L7500 Dump Truck (671-2) 13Veh# 671-2 n/a 54,300 54,300
2003 Sterling Truck Jet (691) 13Veh# 691 n/a 200,400 200,400
1987 Empire Generator (601) 14Veh# 601 n/a 29,200 29,200
1987 Empire Generator (602) 14Veh# 602 n/a 29,200 29,200
1987 Empire Generator (603) 14Veh# 603 n/a 29,200 29,200
1997 New Holland 575E Backhoe (674-2) 14Veh# 674-2 n/a 63,700 63,700
2005 Case Backhoe (682-2) 15Veh# 682-2 n/a 56,300 56,300
2008 Ford Pick Up (698-2) 15Veh# 698-2 n/a 16,350 16,350
Public Utilities-Wastewater Mg Total 62,800 87,200 271,350 151,300 72,650 645,300
Public Utilities-Water Constr
2001 Dodge 1-Ton Utility Truck (426) 11Veh# 426 n/a 30,100 30,100
1999 Dodge, 1-Ton Utility Truck (403) 12Veh# 403 n/a 39,100 39,100
2001 Dodge Pick-Up (419) 12Veh# 419 n/a 22,200 22,200
1991 International 40S (422) 12Veh# 422 n/a 75,200 75,200
1995 Caterpillar Dozer (408) 13Veh# 408 n/a 98,700 98,700
1995 Caterpillar Loader (402) 14Veh# 402 n/a 182,300 182,300
2004 Ford 1-Ton Dump Truck (417) 14Veh# 417 n/a 61,600 61,600
2000 Caterpillar 416CH (405) 15Veh# 405 n/a 135,600 135,600
1995 John Deere Broom Tractor (406) 15Veh# 406 n/a 44,300 44,300
2002 Sterling STE Dump Truck (424) 15Veh# 424 n/a 129,500 129,500
Public Utilities-Water Constr Total 30,100 136,500 98,700 243,900 309,400 818,600
Public Utilities-Water Mgmnt
2001 Dodge Pick Up Truck (661) 11Veh# 661 n/a 10,900 10,900
2001 Dodge Pick Up Truck (695) 11Veh# 695 n/a 10,900 10,900
2002 Dodge Pick-Up (668) 12Veh# 668 n/a 15,850 15,850
2001 Dodge, 1-Ton Utility Truck (680) 12Veh# 680 n/a 19,550 19,550
2000 Airmen Air Compressor (683) 12Veh# 683 n/a 8,800 8,800
2002 Dodge Pick-Up (663) 13Veh# 663 n/a 16,650 16,650
2002 Sterling L7500 (671) 13Veh# 671 n/a 54,300 54,300
1997 New Holland 575E Backhoe (674) 14Veh# 674 n/a 63,700 63,700
2005 Case Backhoe (682) 15Veh# 682 n/a 56,300 56,300
2008 Ford Pick-Up (698) 15Veh# 698 n/a 16,350 16,350
Produced using the Plan-It Capital Planning Software 35
Page 95
Department Project# Priority FY 11 FY 12 FY 13 FY 14 FY 15 Total
Public Utilities-Water Mgmnt Total 21,800 44,200 70,950 63,700 72,650 273,300
Public Utilities-Water Trea Pl
1992 Dodge Van 12Veh# 621 n/a 22,900 22,900
2001 Dodge Pick Up (660) 12Veh# 660 n/a 22,900 22,900
2007 Ford 1-Ton Utlity (622) 15Veh# 622 n/a 45,200 45,200
Public Utilities-Water Trea Pl Total 45,800 45,200 91,000
Public Utilities-WWW Eng
2003 Chevrolet Pick-Up (418) 12Veh# 418 n/a 22,200 22,200
2001 Chevrolet HHR (742) 14Veh# 742 n/a 18,800 18,800
Public Utilities-WWW Eng Total 22,200 18,800 41,000
GRAND TOTAL 114,700 335,900 441,000 477,700 499,900 1,869,200
Produced using the Plan-It Capital Planning Software 36
Page 96
City of Dover, Delaware
Water/Wastewater - Vehicle Replacement Schedule
FY 11 thru FY 15
FUNDING SOURCE SUMMARY
Source FY 11 FY 12 FY 13 FY 14 FY 15 Total
Water/Wastewater Fund 114,700 335,900 441,000 477,700 499,900 1,869,200
GRAND TOTAL 114,700 335,900 441,000 477,700 499,900 1,869,200
Produced using the Plan-It Capital Planning Software 37
Page 97
New projects are
City of Dover, Delaware highlighted
Fiscal 2011 Five Year Capital Investment Plan
FY 11 thru FY 15
PROJECTS BY DEPARTMENT
Department Project# Priority FY 11 FY 12 FY 13 FY 14 FY 15 Total
Public Utilities- Electric Eng
Transmission Relay and Coordination 11-ELENG-01 1 500,000 500,000
Distribution Upgrades 11-ELENG-02 2 400,000 500,000 500,000 500,000 500,000 2,400,000
Substation PT & CT Replacement 11-ELENG-03 3 256,218 267,715 523,933
Equipment Replacement 11-ELENG-04 4 40,000 40,000 40,000 40,000 40,000 200,000
Replacement of 69 kV Breakers 11-ELENG-05 5 100,000 100,000
Lighting Project and Rehabilitation 11-ELENG-06 6 100,000 50,000 50,000 50,000 50,000 300,000
Walker Road Overhead Conversion 11-ELENG-10 10 350,511 282,601 633,112
Generataor Replacement 12-ELENG-02 2 50,000 50,000
Frazier Substation Reliability Upgrade 12-ELENG-03 3 155,000 610,247 765,247
Distribution Feeder Replacement Program 12-ELENG-06 6 377,510 377,510 377,510 377,510 1,510,040
Distribution Capacitors and Controls 12-ELENG-07 7 100,000 100,000 100,000 100,000 400,000
Transmission Line Maintenance Program 12-ELENG-08 8 75,000 75,000 75,000 75,000 300,000
Outage Management & Automatic Voice Reponse 13-ELENG-03 3 250,000 250,000
69 kV Substation Switch Replacement 13-ELENG-04 4 80,000 80,000 80,000 240,000
Horsepond Substation Reliability Upgrade 13-ELENG-06 6 170,000 591,812 761,812
General Scott Switchgear 14-ELENG-05 5 544,700 544,700
Horsepond to Cartanza 69 kV Rebuild 15-ELENG-01 1 330,467 330,467
System Automation 15-ELENG-02 2 300,000 300,000
McKee Run Yard Rebuild 15-ELENG-03 3 450,000 450,000
69 kV Cable Replacement North Street 15-ELENG-04 4 85,000 85,000
System Operations Monitoring 15-ELENG-05 5 30,000 30,000
Division Street Substation Fence 15-ELENG-07 7 50,000 50,000
Public Utilities- Electric Eng Total 1,746,729 1,897,826 2,252,757 2,359,022 2,467,977 10,724,311
Public Utilities-Electric T&D
New Developments 11-ELT&D-01 1 700,000 914,881 932,179 949,823 949,823 4,446,706
Public Utilities-Electric T&D Total 700,000 914,881 932,179 949,823 949,823 4,446,706
Public Utilities-Power Plant
Unit 3 Cooling Tower Life Extension 11-ELPWR-01 1 353,338 40,000 809,390 189,290 1,392,018
Units 1 & 2 Cooling Tower Life Extension 11-ELPWR-02 2 218,730 25,410 37,260 91,000 372,400
McKee Run Unit 3 Turbine Inspection 11-ELPWR-03 3 348,000 673,000 1,021,000
McKee Run Unit 3 Auxillary System Components 11-ELPWR-04 4 113,000 143,000 261,000 25,000 542,000
Miscellaneous Capital Equipment Relacements 11-ELPWR-05 5 71,000 70,000 70,000 70,000 70,000 351,000
Unit 3 FD & ID Fan Control Damper Upgrade 11-ELPWR-06 6 45,000 45,000
Unit 3 DCS Computers & Software Upgrades 11-ELPWR-07 7 30,000 30,000
McKee Run Unit 3 Stack Repairs 11-ELPWR-08 8 25,000 50,000 75,000
Units 1 & 2 Life Extension 11-ELPWR-09 9 276,000 118,000 257,000 32,000 149,000 832,000
McKee Run Demineralizer Control Replacement 12-ELPWR-02 2 65,000 65,000
McKee Run Unit 3 Boiler Systems 12-ELPWR-03 1 130,000 143,000 80,000 353,000
Van Sant Unit 11 Component Replacements 12-ELPWR-04 1 50,000 97,000 147,000
McKee Run Preservatoion of Structures 12-ELPWR-05 6 38,000 42,000 80,000
Unit 3 Cooling Waterline Life Extension 12-ELPWR-06 4 25,000 350,000 375,000
Produced using the Plan-IT Capital Planning Software 1
Page 98
Department Project# Priority FY 11 FY 12 FY 13 FY 14 FY 15 Total
McKee Run Units 1 & 2 Stack Repairs 13-ELPWR-01 1 75,000 75,000
McKee Run Unit 3 High Energy Piping Inspection 14-ELPWR-01 n/a 40,000 360,000 400,000
Van Sant Unit 11 Major Overhaul/Inspection 14-ELPWR-02 n/a 150,000 850,000 1,000,000
McKee Run Hot Water Boilers 14-ELPWR-05 5 70,000 70,000
Public Utilities-Power Plant Total 1,480,068 1,234,410 1,534,650 1,472,290 1,504,000 7,225,418
GRAND TOTAL 3,926,797 4,047,117 4,719,586 4,781,135 4,921,800 22,396,435
Produced using the Plan-IT Capital Planning Software 2
Page 99
City of Dover, Delaware
Fiscal 2011 Five Year Capital Investment Plan
FY 11 thru FY 15
FUNDING SOURCE SUMMARY
Source FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 3,426,797 4,047,117 4,719,586 4,781,135 4,921,800 21,896,435
Electric Revenue 500,000 500,000
GRAND TOTAL 3,926,797 4,047,117 4,719,586 4,781,135 4,921,800 22,396,435
Produced using the Plan-IT Capital Planning Software 3
Page 100
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-ELENG-01
Useful Life Unknown
Project Name Transmission Relay and Coordination Category Electric
New Project: Yes Account Number: Priority 1
Time-Line:
Total Project Cost: $500,000
Description
To field verify and evaluate and improve the City of Dover’s existing transmission line protection scheme. This project will be completed in FY
2011.
Justification
The City of Dover has recently experienced unnecessary electric outages resulting from issues involving transmission line protection. This project
will examine the transmission system model; relay settings, coordination, and wiring. Utilizing a third party to conduct the field verification will
ensure existing problems are identified in order to mitigate future outages. The field investigation will test CT ratios, equipment inputs, wiring and
trip scheme. The field evaluations will be lead by highly skilled and experienced technical engineers insuring the reliability and safety of the City
of Dover’s local electric grid. Additionally, the Public Utilities will purchase an electric system modeling software, enabling city staff to build a
distribution model to add to this “corrected” transmission model. This modeling software will allow City staff to conduct system studies, which
will decrease dependency of contracted firms. Consequences of delaying or eliminating this project include Continual electrical outages due to
undiscovered problems.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 500,000 500,000
Total 500,000 500,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric Revenue 500,000 500,000
Total 500,000 500,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 4
Page 101
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-ELENG-02
Useful Life Unknown
Project Name Distribution Upgrades Category Electric
New Project: Account Number: Priority 2
Time-Line:
Total Project Cost: $4,054,000
Description
This project involves the systemic replacement of overhead lines with underground lines whenever services are being moved, wire is damaged,
trees cause a high number of outages, or development is in progress, and when it is beneficial to the Utility to convert to underground. This can
involve a single line section or an entire residential neighborhood. Annual outage records are reviewed and selected areas are scheduled for
upgrade to underground service. Additionally, this program funds the replacement of existing underground conductors and equipment that have
reached their useful life and have started failing and require replacement. This project will be ongoing over the 12 months of the budget year. This
account is used to upgrade any trouble areas during the year. The following developments are to be upgraded: Crossgates, Buchanan Acres,
Greenview, and Blades
Justification
The number of storm and tree-related outages has been greatly reduced under this program and further improvements can be made to insure the
most reliable electric service possible. Reliability has become one of most important factors to electric customers, second only to safety. The utility
has responded by attempting to provide the most reliable system possible. Underground cable replacement is necessary as the useful, reliable, life
of the original underground cable was 20–30 years. By proactively replacing this cable we will minimize outages and improve system reliability. In
addition to cable replacement, overhead lines are replaced with underground to minimize outages caused by tree growth or animal contact. Lastly,
overhead lines that have reached the end of their useful life are replaced with underground instead of rebuilding the overhead. : Continued outages
lead to increased complaints from our customers and will lead to customer dissatisfaction. There will be increased costs for repairs made under
outage conditions as well as loss of electric revenue.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 400,000 500,000 500,000 500,000 500,000 2,400,000
Total 400,000 500,000 500,000 500,000 500,000 2,400,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 400,000 500,000 500,000 500,000 500,000 2,400,000
Total 400,000 500,000 500,000 500,000 500,000 2,400,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 5
Page 102
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELENG-03
Useful Life Unknown
Project Name Substation PT & CT Replacement Category Electric
New Project: No Account Number: Priority 3
Time-Line:
Total Project Cost: $784,813
Description
This project replaces aging metering/system protection equipment in the older substations. The equipment to be replaced measures the line voltage
and current which is then interpreted by the relays for system protection. Additionally, the lightning arrestors will be replaced which protects the
equipment during lightning strikes.
Justification
This equipment has a normal 30-year life and has exceeded that in all of our substations except the newest substations. By replacing the equipment
during normal scheduled maintenance shut downs, it will prevent larger outages due to equipment failure. Such equipment has caused large
outages by faulting due to its age. Additionally, many of the current components have not been tested for PCB’s which could result in expensive
cleanup charges should they fail. Materials to be bid in November 2009. Equipment will start arriving in the Spring 2010 and be installed during
the regular scheduled substation maintenance schedules until the project is completed in FY 2012.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
260,880 Construction/Maintenance 256,218 267,715 523,933
Total Total 256,218 267,715 523,933
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
260,880 Electric I & E Fund 256,218 267,715 523,933
Total Total 256,218 267,715 523,933
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 6
Page 103
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 11-ELENG-04
Useful Life Unknown
Project Name Equipment Replacement Category Electric
New Project: No Account Number: Priority 4
Time-Line:
Total Project Cost: $240,000
Description
Replacement of capital equipment valued between $5,000 and $25,000.
Justification
Extended equipment and/or unit outage time will result from lack of funding this project. This will have a direct effect on the cost of energy during
the extended outage time as well as increase future energy capacity charges.
This project is required to fund the replacement of capital items that are expected to reach their useful life and will need to be replaced to maintain
system reliability
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
40,000 Equip/Vehicle/Furnishings 40,000 40,000 40,000 40,000 40,000 200,000
Total Total 40,000 40,000 40,000 40,000 40,000 200,000
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
40,000 Electric I & E Fund 40,000 40,000 40,000 40,000 40,000 200,000
Total Total 40,000 40,000 40,000 40,000 40,000 200,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 7
Page 104
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELENG-05
Useful Life Unknown
Project Name Replacement of 69 kV Breakers Category Electric
New Project: No Account Number: Priority 5
Time-Line:
Total Project Cost: $908,443
Description
This is an ongoing project that involves the replacement of 69 KV breakers. Locations for the breakers to be installed include the following
substations: Frazier and Danner Farm.
Implementation of this project will allow for the replacement of several old and unreliable breakers allowing full utilization of the new 230 KV
substation. The expected total project cost of $908,443 was spread out over a six-year timetable with completion in FY 2011 by replacing the last
two units.
Justification
The 69 KV breakers in the transmission system vary in age and reliability. Currently there are 39 of these breakers in the transmission system.
Installation of the 230 KV substation placed the breakers in a higher fault current environment than they are rated to safely operate in. This project
will replace the most vulnerable breakers first and will eventually replace all of the oil-filled breakers with SF6 gas-filled breakers designed to
handle the higher fault current. Additionally, at the time the breakers are replaced the control wiring and relays will also be replaced to bring the
installation into current standards.
Since these breakers have reached the end of their expected life, failure to replace them will result in miss-operation and either cause larger outages
than necessary or cause greater damage to protected equipment. If the breaker failed on an interconnected customer, this failure could result in
greater liability exposure.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
808,443 Construction/Maintenance 100,000 100,000
Total Total 100,000 100,000
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
808,443 Electric I & E Fund 100,000 100,000
Total Total 100,000 100,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 8
Page 105
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELENG-06
Useful Life Unknown
Project Name Lighting Project and Rehabilitation Category Electric
New Project: No Account Number: Priority 6 --
Time-Line:
Total Project Cost: $650,000
Description
This fund was developed to replace and repair existing street lights or install new lights upon customer request.This fund will remain active as long
as there are improvements to be made. Private area lighting requests are a source of revenue for the City. Areas completed are Greens of Dover,
Farmview, Twelve Oaks, Old Mill Acres I, White Oak Apartments, Westfield, Fairview, Cranberry Run, Millcreek, Independence Village and
Governors Avenue (South 100 Block). Areas to be completed this year are: Deerfield, Central Middle School, Fox Hall, Hidden Oaks, and a
portion of North Governors Ave. An additional $50,000 was added to this year to make additional progress to North Governors Ave.
Justification
The Electric Division receives numerous requests for lighting improvements. These requests are due to the lights aging, and as they age they put
out less light and become unreliable. There are many developments that are in need of street light improvements. This fund would also provide
funding for new large security light requests. Consequences of delaying or eliminating this project include constant complaints of poor street
lighting and multiple failures due to antiquated lights.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
300,000 Construction/Maintenance 100,000 50,000 50,000 50,000 50,000 300,000 50,000
Total Total 100,000 50,000 50,000 50,000 50,000 300,000 Total
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
300,000 Electric I & E Fund 100,000 50,000 50,000 50,000 50,000 300,000 50,000
Total Total 100,000 50,000 50,000 50,000 50,000 300,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 9
Page 106
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-ELENG-10
Useful Life Unknown
Project Name Walker Road Overhead Conversion Category Electric
New Project: Account Number: Priority 10 --
Time-Line:
Total Project Cost: $633,112
Description
This project will be constructed in conjunction with the water main upgrade planned for this section of Walker Road. The Electric Division will
install conduit, cable and equipment, and remove the overhead power lines as the Water Division installs the new water main. This project will be
in conjunction with the water main project. Therefore, if the water main is delayed this project will also be delayed.
Justification
The installation of the new power lines will increase the power capacity and improve the reliability to the customers by decreasing the exposure of
the system to weather events. Additionally, the existing overhead requires upgrading to increase the capacity of the electric system. The aging pole
line will require the replacement of new poles and overhead wire. Leaving the overhead line in service increases the chances of weather related
damages.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 117,901 117,901
Other 164,700 164,700
Miscellaneous 350,511 350,511
Total 350,511 282,601 633,112
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 350,511 282,601 633,112
Total 350,511 282,601 633,112
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 10
Page 107
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 12-ELENG-02
Useful Life Unknown
Project Name Generataor Replacement Category Electric
New Project: Yes Account Number: Priority 2
Time-Line:
Total Project Cost: $50,000
Description
Replace the existing Public Utilities Administration Building’s back-up generator.This project will be completed in FY 2012.
Justification
This building houses the 24 hour system operations facility, for the city’s electric and water/wastewater infrastructure. The existing 1975 back-up
generator has reached its mechanical limits and is now requiring numerous unplanned cost, to ensure that it is operational. the Public Utilities
building were to experience an electrical outage and this back-up generator were to fail, the electric and water/wastewater departments would not
be able to monitor or remotely control their respective systems or communicate with customers and staff.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Equip/Vehicle/Furnishings 50,000 50,000
Total 50,000 50,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 50,000 50,000
Total 50,000 50,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 11
Page 108
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-ELENG-03
Useful Life Unknown
Project Name Frazier Substation Reliability Upgrade Category Electric
New Project: No Account Number: Priority 3
Time-Line:
Total Project Cost: $765,247
Description
The high side of the substation will be upgraded to include transmission line protection breakers as well as the transformer breaker.
Justification
When the transmission line experiences a fault this substation loses power until the short circuit is found and the appropriate switching is
accomplished. With the installation of the two new line breakers the faulted transmission line will be isolated from the substation and the
customers will not experience an interruption of service. Consequences of delaying or eliminating thie project will be accepting the outages in the
northwest section of the system during transmission line faults. The design will begin in July 2011; materials will be ordered in July 2012 and
construction to be completed by June 2013.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 155,000 155,000
Construction/Maintenance 610,247 610,247
Total 155,000 610,247 765,247
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 155,000 610,247 765,247
Total 155,000 610,247 765,247
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 12
Page 109
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-ELENG-06
Useful Life Unknown
Project Name Distribution Feeder Replacement Program Category Electric
New Project: No Account Number: Priority 6 --
Time-Line:
Total Project Cost: $1,887,550
Description
Substation feeders are defined as the three-phase lines that carry the load from the substations to the customers’ neighborhood. They interconnect
to other substations to provide load redundancy should there be a failure of an adjacent substation. Many of the older substation feeders have
smaller conductors that cannot carry the load that is required during system peaks and emergency situations. This project would systematically
upgrade these conductors to increase the capacity of the feeders as well as ultimately reducing system losses. Lastly, many of the feeder
components have reached the end of their useful life and require substantial maintenance.
Justification
Due to the age and condition of the current feeders, delaying this systematic maintenance/upgrade program will result in reduced system utilization
as well as detrimentally impacting future reliability.
These lines are typically older, smaller, and are reaching the end of their life. This program will provide the needed systematic maintenance to the
conductors, cross arms, switches, and insulators, as well as increasing system capacity hence resulting in more efficient operations by reducing line
losses.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Construction/Maintenance 377,510 377,510 377,510 377,510 1,510,040 377,510
Total 377,510 377,510 377,510 377,510 1,510,040 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 377,510 377,510 377,510 377,510 1,510,040 377,510
Total 377,510 377,510 377,510 377,510 1,510,040 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 13
Page 110
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-ELENG-07
Useful Life Unknown
Project Name Distribution Capacitors and Controls Category Electric
New Project: No Account Number: Priority 7 --
Time-Line:
Total Project Cost: $864,995
Description
Install distribution capacitors throughout the system to correct poor power factor on distribution circuits. Install capacitor controllers capable of
two-way communication to provide real-time monitoring and remote control operation. These controllers will be capable of switching the
capacitors on and off to comply with system requirements. This project will also replace outdated substation meters with units capable of advanced
metering such as power factor and harmonics to further analyze system performance. Lastly, distribution line recorders will be purchased and
installed to provide power factor recordings to fine tune this operation.
Justification
Additional capacitance is required in order to meet system power factor requirements at the Delmarva Power and Light interchange point. This was
substantiated through a load-flow study conducted by Shaw in early 2004 and distribution study by Wilson & Wilson in 2006. The current
capacitor controls are not providing the granularity required to turn them off and on as required to meet both the power quality requirements of our
customers and DP&L requirements. Additional controls are required to fine tune the systems operation. Without the additional capacitor banks and
more importantly controls, the City may experience a low/high voltage problem at the customer level and/or the possibility of having to pay power
factor penalties to Delmarva Power and Light.
Prior Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
464,995 Construction/Maintenance 100,000 100,000 100,000 100,000 400,000
Total Total 100,000 100,000 100,000 100,000 400,000
Prior Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
464,995 Electric I & E Fund 100,000 100,000 100,000 100,000 400,000
Total Total 100,000 100,000 100,000 100,000 400,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 14
Page 111
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 12-ELENG-08
Useful Life Unknown
Project Name Transmission Line Maintenance Program Category Electric
New Project: Account Number: Priority 8 --
Time-Line:
Total Project Cost: $375,000
Description
Replace aging porcelain insulators on the transmission pole lines with new polymer insulators.
Justification
Insulators have a defined equipment life due to sun and weather conditions breaking down the porcelain and base bonding cement. Insulators
installed in 1960's and 1970's are due for replacement because of this deterioration. We have experienced several transmission outages due to
insulator failure. Replacing the insulators should extend the life an additional 30 years. Outages may occur if insulators are not replaced and fail
due to deterioration.
Beginning in FY 2012 through FY 2017, we will replace the insulators on the older transmission lines.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Miscellaneous 75,000 75,000 75,000 75,000 300,000 75,000
Total 75,000 75,000 75,000 75,000 300,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 75,000 75,000 75,000 75,000 300,000 75,000
Total 75,000 75,000 75,000 75,000 300,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 15
Page 112
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 13-ELENG-03
Useful Life Unknown
Project Name Outage Management & Automatic Voice Reponse Category Electric
New Project: Yes Account Number: Priority 3
Time-Line:
Total Project Cost: $250,000
Description
To implement an outage management system that overlays the public utilities newly installed GIS mapping system. This project will be completed
in FY 2013.
Justification
This outage management system will increase the electric department’s efficiency in managing outages. The system will provide the operators a
precise troubleshooting algorithm, to allow for nearly immediate identification of the outage causes and quick dispatch of restoration personnel.
The system will also provide an automatic voice response to manage the inrush of telephone calls, when an outage is being experienced.
Therefore, additional public utilities’ staff will no longer be required to postpone their work obligations, to relocate to the system operation center
or assist in receiving telephone calls.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 250,000 250,000
Total 250,000 250,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 250,000 250,000
Total 250,000 250,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 16
Page 113
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 13-ELENG-04
Useful Life Unknown
Project Name 69 kV Substation Switch Replacement Category Electric
New Project: Account Number: Priority 4
Time-Line:
Total Project Cost: $480,000
Description
This project will be replacing obsolete 69kV switches in the substation/transmission system.
Justification
Switch replacement will begin in FY 2013 and will be completed in FY 2018
The majority of the switches are very old, making for difficult operation and frequent maintenance to ensure operation as needed. Delaying this
program will result in switch failure possibly resulting in wide spread power outages. The system has experienced more frequent switch failures in
recent years.
The new switches will be gang operated switches which are electrically better to operate and most importantly increase safety to the operator. The
switches that are to be replaced have reached the life expectancy and have a potential of failure if not replaced.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Miscellaneous 80,000 80,000 80,000 240,000 240,000
Total 80,000 80,000 80,000 240,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 80,000 80,000 80,000 240,000 240,000
Total 80,000 80,000 80,000 240,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 17
Page 114
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 13-ELENG-06
Useful Life Unknown
Project Name Horsepond Substation Reliability Upgrade Category Electric
New Project: Account Number: Priority 6 --
Time-Line:
Total Project Cost: $761,812
Description
The high-side of the substation will be upgraded to include two transmission line protection breakers.
Justification
When the transmission line experiences a fault this substation loses power until the short circuit is found and the appropriate switching is
accomplished. With the installation of the line breakers the faulted transmission line will be isolated from the substation and the customers will not
experience an interruption of service. Consequences of delaying or eliminating this project will result in accepting the outages in the southeast
section of the system during transmission line faults. The design and long lead time materials will be completed in FY 2013 and the majority of the
materials will be purchased and construction completed in FY 2014.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 70,000 60,000 130,000
Construction/Maintenance 100,000 531,812 631,812
Total 170,000 591,812 761,812
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 170,000 591,812 761,812
Total 170,000 591,812 761,812
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 18
Page 115
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 14-ELENG-05
Useful Life Unknown
Project Name General Scott Switchgear Category Electric
New Project: No Account Number: Priority 5
Time-Line:
Total Project Cost: $544,700
Description
This project will recondition the metal clad switchgear and replace the distribution breakers as they have reached the end of their useful life.
Justification
This station carries the industrial and residential load on the west side of Dover. The station distribution switch gear was installed in 1985 and the
reconditioning of the switch gear should extend the life of the equipment to 2033. Additionally, the breakers have numerous moving parts,
including plastic components that tend to fail with age resulting in mis-operation of the breaker. General Scott’s switchgear is aging and
reconditioning will extend the life of the switchgear, and replacing the breakers will facilitate correct fault operation. Equipment order and work
will be completed in FY 2014.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 544,700 544,700
Total 544,700 544,700
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 544,700 544,700
Total 544,700 544,700
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 19
Page 116
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-ELENG-01
Useful Life Unknown
Project Name Horsepond to Cartanza 69 kV Rebuild Category Electric
New Project: Yes Account Number: Priority 1
Time-Line:
Total Project Cost: $330,467
Description
This project will replace the poles, conductor, and insulators from Horsepond Substation to Long Point Road.This project will begin and reach
completion in FY 2015.
Justification
Currently, the conductor size from Horsepond substation to Long Point rd limits the capacity that can be carried on feeder 4. An upgrade from the
existing 636 ACSR to 795 ACSR would lift this limit and match the conductor from Cartanza Substation to Horsepond Substation. The poles have
nearly reached the life expectancy. The batch of poles from Horsepond to Long Point Road have been known to have numerous problems with
woodpecker destruction. The annual pole testing program has noted deficiencies in the above ground condition of these poles. Aging poles and
hardware may fail causing outage in east Dover.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 75,000 75,000
Construction/Maintenance 225,425 225,425
Other 30,042 30,042
Total 330,467 330,467
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 330,467 330,467
Total 330,467 330,467
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 20
Page 117
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-ELENG-02
Useful Life Unknown
Project Name System Automation Category Electric
New Project: Yes Account Number: Priority 2
Time-Line:
Total Project Cost: $450,000
Description
This project will engineer and install a self healing or "smart" distribution system. This project will begin in FY 2015 and reach completion in FY
2020.
Justification
This project will include an engineering study to be performed using a system model to develop a scheme that will allow the distribution system to
be self healing in the event of a fault. Following the study, automation equipment will be purchased to detect problems on the system, isolate the
affected area, and reenergize lines not affected. This will improve the reliability of the city’s local electric grid, minimize customer outages, and
increase customer satisfaction.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 300,000 300,000 150,000
Total 300,000 300,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 300,000 300,000 150,000
Total 300,000 300,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 21
Page 118
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-ELENG-03
Useful Life Unknown
Project Name McKee Run Yard Rebuild Category Electric
New Project: Yes Account Number: Priority 3
Time-Line:
Total Project Cost: $1,150,000
Description
The purpose of this project is to refurbish McKee Run switching yard. The engineering will be completed in FY 2015. Construction will be the
following year, FY 2016.
Justification
The City of Dover’s electrical system has undergone a complete conversion to a 69KV transmission network. Hence, eliminating the old 22KV
transmission network. Therefore, the 22KV system located at McKee Run Generating Plant should also be eliminated and a second 12470/69 KV
step-up transformer should be installed, provided that Units 1 & 2 are still in operation. The estimate is based on using the old Mid City Step up
transformer.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 250,000 250,000 700,000
Miscellaneous 200,000 200,000
Total
Total 450,000 450,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 450,000 450,000 700,000
Total 450,000 450,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 22
Page 119
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-ELENG-04
Useful Life Unknown
Project Name 69 kV Cable Replacement North Street Category Electric
New Project: Yes Account Number: Priority 4
Time-Line:
Total Project Cost: $1,565,710
Description
This project will replace the aging 69 KV underground cables from North Street switching yard to Kraft’s and Proctor & Gamble’s (customer
owned) substations.
Justification
Proctor & Gamble and Kraft are two (2) of the City of Dover’s 69 KV customers and it is our obligation to provide them with adequate and
reliable service. The cables were installed in 1973 and have had two repairs. The first repair was in 1986 and the second repair was in 1992.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 85,000 85,000 1,480,710
Total 85,000 85,000 Total
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 85,000 85,000 1,480,710
Total 85,000 85,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 23
Page 120
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 15-ELENG-05
Useful Life Unknown
Project Name System Operations Monitoring Category Electric
New Project: Yes Account Number: Priority 5
Time-Line:
Total Project Cost: $30,000
Description
This project will replace the system operations monitoring screens.Completion is schedule for FY2015.
Justification
This project replaces the existing monitoring screens in system operations, with projection screens. City staff uses an array of these devices to
view and operate the electric system and the lift stations. Additionally, the Public Utilities recently added 6 security cameras surrounding its
facility and 2 security cameras at the interconnecting substation, which is our connection to the bulk electric system. These monitoring screens are
also utilize in these security hardening measures.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Equip/Vehicle/Furnishings 30,000 30,000
Total 30,000 30,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 30,000 30,000
Total 30,000 30,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 24
Page 121
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities- Electric Eng
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 15-ELENG-07
Useful Life Unknown
Project Name Division Street Substation Fence Category Electric
New Project: Yes Account Number: Priority 7 --
Time-Line:
Total Project Cost: $50,000
Description
This project will replace the existing fence at the Division Street Substation.
Justification
This project will replace the existing fence at Division Street Substation with a decorative fence, similar to the fence that was erected at St. Jones
Substation. The existing fence no longer meets the National Electric Safety Code height requirements and is generally in poor condition. Existing
structure does not meet the National Electric Safety Code (NESC).
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Other 50,000 50,000
Total 50,000 50,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 50,000 50,000
Total 50,000 50,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 25
Page 122
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Electric T&D
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-ELT&D-01
Useful Life Unknown
Project Name New Developments Category Electric
New Project: No Account Number: Priority 1
Time-Line:
Total Project Cost: $5,481,506
Description
This project purchases materials and equipment that are used to provide electric service to new housing developments, businesses, and industrial
developments. Additionally, a portion of this expense is offset by the extension payments whereby new developers pay a $1,200 per residential lot
connection fee, or business and industrial developers pay the total material expense for line extensions. This is an ongoing project.
Justification
During the course of each budget year, new developers request line extensions for new electric projects. Some are new projects, while other
projects may have received plan approval previously but were not completed for any number of reasons. Coonsequences of delaying or eliminating
this project include developers would not be able to receive electric service to new facilities.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 700,000 914,881 932,179 949,823 949,823 4,446,706
Total 700,000 914,881 932,179 949,823 949,823 4,446,706
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 700,000 914,881 932,179 949,823 949,823 4,446,706
Total 700,000 914,881 932,179 949,823 949,823 4,446,706
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 26
Page 123
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELPWR-01
Useful Life Unknown
Project Name Unit 3 Cooling Tower Life Extension Category Electric
New Project: Yes Account Number: Priority 1
Time-Line:
Total Project Cost: $1,392,018
Description
This project will repair the cooling tower decking, mechanical and internal structure on Unit 3 Cooling Tower. The repairs/replacements include a
new design on Unit 3 Cooling Tower to improve heat transfer and assure that the discharge temperature of the cooling tower continues to meet
regulatory requirements. This is significantly important to the upcoming discharge limit that is being proposed by the Delaware River Basin
Committee (DRBC). Inspection of the tower was completed in 2009. Engineering and bid cycle to be completed in 2010 within the operations
budget. The installation work to be completed in 2011, 2012 and 2013. This repair / replacement work will extend the service life of the towers
five to ten years.
Justification
The cooling tower is nearing the end of life its serviceable life and is expected to impact the cooling tower performance to an extent that it will also
affect unit performance and will limit the unit full load capability. In order to extend the life of the plant, these repairs/ replacements will be
required as well as aid in meeting the discharge temperature limitations that is being actively sought by the DRBC. The integrity of the cooling
tower decking and main structure frame work has become an issue. Continued deterioration of the cooling tower wood members and fan decking
could result in an employee related accident or equipment failure. Also continued deterioration of the cooling tower performance will lead to load
reductions on the unit during periods of high ambient temperatures. This will occur during the time period when generation costs are at their peak.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 353,338 40,000 809,390 189,290 1,392,018
Total 353,338 40,000 809,390 189,290 1,392,018
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 353,338 40,000 809,390 189,290 1,392,018
Total 353,338 40,000 809,390 189,290 1,392,018
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 27
Page 124
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELPWR-02
Useful Life Unknown
Project Name Units 1 & 2 Cooling Tower Life Extension Category Electric
New Project: Yes Account Number: Priority 2
Time-Line:
Total Project Cost: $372,400
Description
This project will repair the cooling tower decking, mechanical and internal structure on Unit 1 and 2 Cooling Tower. This is significantly
important to the upcoming discharge limit that is being proposed by the Delaware River Basin Committee (DRBC).This repair / replacement work
will extend the service life of the towers five to ten years. Inspection of the tower was completed in 2009. Engineering and bid cycle to be
completed in 2010 within the operations budget. The installation work to be completed in 2011, 2012 and 2013.
Justification
The cooling tower decking has reached its serviceable life and is in need of immediate replacement in order to maintain its current thermal
efficiency as well as its structural integrity. Continued deterioration of the tower will affect unit performance and will limit the unit full load
capability. In order to extend the life of the plant, these repairs/ replacements will be required. Additionally this will aid in meeting the discharge
temperature limitations that is being actively sought by the DRBC (Delaware river Basin Commission).
The integrity of the cooling tower decking and main structure frame work has become an issue. Continued deterioration of the cooling tower wood
members and fan decking could result in an employee related accident or equipment failure. Also continued deterioration of the cooling tower
performance will lead to load reductions on the unit during periods of high ambient temperatures. This will occur during the time period when
generation costs are at their peak.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 218,730 25,410 37,260 91,000 372,400
Total 218,730 25,410 37,260 91,000 372,400
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 218,730 25,410 37,260 91,000 372,400
Total 218,730 25,410 37,260 91,000 372,400
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 28
Page 125
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Services Director
Type Maintenance
Project # 11-ELPWR-03
Useful Life Unknown
Project Name McKee Run Unit 3 Turbine Inspection Category Electric
New Project: No Account Number: Priority 3
Time-Line:
Total Project Cost: $1,021,000
Description
This project will inspect turbine, generator, and auxiliary equipment to determine repairs needed to keep the unit operational and to assess
remaining life of the unit. Assess repair quotes, if repairs are needed, to determine best available options. This project will be completed in two
phases, an initial limited inspection followed by an extensive detailed inspection and repair planned outage. The first phase will utilize borescope
equipment to determine condition of components that can be observed through limited access locations along the turbine casing and through
turbine inlet valve/s. This inspection will provide a general condition assessment of a portion of the highly stress components of the turbine and
may provide insight into the extent of replacement parts needed to successfully execute phase 2. Phase 2 to be completed one year later will
include a full disassembly and inspection of the turbine and auxiliary equipment and a limited disassembly of the Generator.
Scheduled for spring of 2011 for phase 1 and spring of 2012 for phase 2.
This project was previously in the 5 year plan as a 2014 project. The project price is an estimated cost based on budgetary vendor pricing and does
not include the cost of any major turbine component parts.
Justification
An assessment of the unit needs to be performed to determine condition of the highly stressed turbine components to assure continued reliability.
Documented condition of rotor blading during last inspection noted deterioration of 9th stage blades and temporary repairs performed. A
significant probability that the blades should be replaced. Additionally, high pressure rotor bore has never been inspected and should be performed
per industry standards. Consequences of delaying or eliminating this project include possible catastrophic equipment failure and indefinite loss of
unit availability.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 256,000 467,000 723,000
Other 32,000 111,000 143,000
Miscellaneous 60,000 95,000 155,000
Total 348,000 673,000 1,021,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 348,000 673,000 1,021,000
Total 348,000 673,000 1,021,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 29
Page 126
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELPWR-04
Useful Life Unknown
Project Name McKee Run Unit 3 Auxillary System Components Category Electric
New Project: Yes Account Number: Priority 4
Time-Line:
Total Project Cost: $598,000
Description
This project will perform inspections and repairs of Unit auxiliary system components that have been identified as critical through the plant life
assessment study. Critical auxiliary systems components are those components that could result in unit load reduction or outage with consequential
loss of capacity and / or generating although they would not individually affect the long range financial viability of the unit. Components identified
include Boiler feed pumps and motors, condensate pumps and motors, circulating water pumps and motors, feedwater heater #5. This project
captures the costs of the replacement/ refurbishment multiple components.This is a multi-year project beginning in 2011 and continuing into 2015.
Justification
Critical system components that, if they fail, will result in loss of generation and or capacity. Addressing these assets in a systematic fashion will
result in minimizing forced outages and eliminating major maintenance expenses associated with component failure. Performing work work as
scheduled will also levelize maintenance expenditures. Delaying this project could result in the failure of critical unit equipment and subsequent
lose of generation and or capacity.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Construction/Maintenance 75,000 80,000 130,000 24,000 309,000 56,000
Other 3,000 6,000 6,000 1,000 16,000
Total
Miscellaneous 35,000 57,000 125,000 217,000
Total 113,000 143,000 261,000 25,000 542,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 113,000 143,000 261,000 25,000 542,000 56,000
Total 113,000 143,000 261,000 25,000 542,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 30
Page 127
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 11-ELPWR-05
Useful Life Unknown
Project Name Miscellaneous Capital Equipment Relacements Category Electric
New Project: No Account Number: Priority 5
Time-Line:
Total Project Cost: $351,000
Description
Replace or procure capital equipment valued between $5,000 and $25,000.
Equipment includes the following:
HVAC and process equipment motors and breakers (2011) - $12,000 and (2012) - $ 21 ,000
Station critical system pumps (2011) - $20,000 and (2012) - $20,000
Unit 1-2 Cooling tower fan drives (2011) - $6,000 and (2012) - $ 6,000
Boiler system safety and control valves (2011) - $8,000 and (2012) - $8,000
Boiler benchboard controls and field instrumentation (2011) - $5,000 and (2012) - $5000
#1 and #3 elevator mechanical components (2011) - $20,000 and (2013) - $20,000
Units 1,2 and 3 Pilot gas piping and flow instrumentation component inspections (2013) - $50,000
Items listed above are not inclusive of all years but represent the first two years of the project.
This project will begin in Fiscal 2011.
Justification
This project is required to fund the replace of capital items that are expected to reach their useful life in 2011 and beyond that have not been
identified in other Capital projects and will need to be replaced to maintain plant system and unit reliability.
Extended equipment and /or unit outage time will result from lack of funding this project. This will have a direct effect on the cost of energy during
the extended outage time as well as increase future energy capacity charges.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 71,000 70,000 70,000 70,000 70,000 351,000
Total 71,000 70,000 70,000 70,000 70,000 351,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 71,000 70,000 70,000 70,000 70,000 351,000
Total 71,000 70,000 70,000 70,000 70,000 351,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 31
Page 128
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-ELPWR-06
Useful Life Unknown
Project Name Unit 3 FD & ID Fan Control Damper Upgrade Category Electric
New Project: Yes Account Number: Priority 6 --
Time-Line:
Total Project Cost: $45,000
Description
Replace the 4 existing pneumatic Forced Draft (FD) & Induced Draft (ID) Fan control operators with electric drive operators.
Justification
To have a more repeatable control of the fan control damper position and a more reliable controller. Extreme weather conditions have affected the
operability and repeatability of these large pneumatic controllers. Additionally, parts for the existing controllers are becoming hard to find. The
electric drive operators will not be affected by weather and they will provide repeatable control with far less hysteresis than the pneumatic drives.
This will provide greater capability to tune the boiler combustion process resulting in improved unit efficiency and stack emissions. Completing
this project will result in a more reliable system that will improve the efficiency of the fans and boiler and will help ensure compliance with our
current air permits.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 45,000 45,000
Total 45,000 45,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 45,000 45,000
Total 45,000 45,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 32
Page 129
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 11-ELPWR-07
Useful Life Unknown
Project Name Unit 3 DCS Computers & Software Upgrades Category Electric
New Project: Yes Account Number: Priority 7 --
Time-Line:
Total Project Cost: $30,000
Description
This project will replace the 7 existing Digital Control System (DCS) computers (servers-4, clients-2 and logic developer-1) and upgrade the ABB
software that is being used to control the Boiler Master/ Electro Hydraulic Control (EHC) System and the Burner Management System that are
located in Unit 3 control room (clients) and in the Net 90 control room (server and logic developer). This will ensure that when Unit 3 is called
upon to operate that the plants staff will be able to start on bring Unit 3 on line with no outages.
The project is estimated to be completed in 2011.
The computer and ABB controls upgrade would allow the system to operate faster and be more reliable. Additionally, life cycle of these computer
systems is typically 5 to 6 years.
Justification
The DCS computers were installed in March of 2003 as part of the Over-Fired Air Project. These computers are in service 24/7 and due to their
run time and the life expectancy of the computers, the need to change out the computer and upgrade the ABB control system is consistent with
COD IT protocol of changing out computers after five years. By upgrading the computers and the control software, the plant will have a more
reliable system. Included in the software upgrade is an improvement in the redundancy of the EHC Computers. Due to the age of the computers,
one of the computers could crash resulting in Unit 3 not be available to run when called upon.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 30,000 30,000
Total 30,000 30,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 30,000 30,000
Total 30,000 30,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 33
Page 130
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELPWR-08
Useful Life Unknown
Project Name McKee Run Unit 3 Stack Repairs Category Electric
New Project: Yes Account Number: Priority 8 --
Time-Line:
Total Project Cost: $75,000
Description
An inspection will be made and assessment will be made from the inspection to determine the remaining life of the stack and also provide cost of
any repairs required to extend the life of the stack for 15 to 20 yrs. Repairs to the stack lining and exterior will be made in order to allow continued
operation of Unit 3. The current expectation is to perform the repairs in fiscal year 2014/15. A determination for the necessity of repairs to Unit 3
stack will be performed on an annual basis. An internal and external inspection will be performed by outside consultant in 2010.
Justification
Current plans are to contract for an external and internal inspection in 2011 to develop an action plan to extend the life of the stack as well as
develop costs for the repairs of the stack by outside contractors. We will perform in-house inspections of the stack on an annual basis until 2015 at
which time we will contract for needed repairs as determined by the 2011 and subsequent yearly inspections. Delaying necessary repairs could lead
to more costly repairs in the future, unplanned forced outage on Unit 3, fall out of internal material upon the surrounding community and potential
injury to employees. Earnings from the sale of capacity may also be affected.
Due to the reduced operation of Unit 3, the plan is to inspect the stack in fiscal year 2010/11. The repair portion of the project has been moved out
to fiscal year 2014 /15. The plan is to perform regular assessments of the internal condition to the stack, then determine when repairs may be
necessary. Severe damage may move the repairs to an earlier date however the reduced run time of Unit 3 may afford an ability to postpone repairs
to a later date.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 25,000 50,000 75,000
Total 25,000 50,000 75,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 25,000 50,000 75,000
Total 25,000 50,000 75,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 34
Page 131
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 11-ELPWR-09
Useful Life Unknown
Project Name Units 1 & 2 Life Extension Category Electric
New Project: Yes Account Number: Priority 9 --
Time-Line:
Total Project Cost: $832,000
Description
Replace or procure capital equipment valued between $5,000 and $75,000. Equipment includes the following:
Boiler Inspection (2013)-$150,000
Turbine Valve and first stage turbine Inspection. (2011) -$170,000
Oil Lubricating system components (2011)- $10,000
Condensate and Feed Water system components (2011) -$30,00 and (2012) -$62,000 and (2013) - $20,000
Circulating water system components (2012) - $8,000, (2013) - $32,000 and (2014) - $32,000
Boiler duct work and air flow system components (2011) - $66,000 and (2012) - $48,000 and (2013) -$55,000
Critical piping inspections and boiler feed pumps (2015) - $149,000
This project will implemented in 2011and be completed in 2015
Justification
This project is required to fund the replace of capital items that are expected to reach their useful life in 2011 to 2014 and will need to be replaced
to maintain plant system and unit reliability. Extended equipment and /or unit outage time will result from lack of funding this project. This will
have a direct effect on the cost of energy during the extended outage time as well as increase future energy capacity charges.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 276,000 118,000 257,000 32,000 149,000 832,000
Total 276,000 118,000 257,000 32,000 149,000 832,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 276,000 118,000 257,000 32,000 149,000 832,000
Total 276,000 118,000 257,000 32,000 149,000 832,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 35
Page 132
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 12-ELPWR-02
Useful Life Unknown
Project Name McKee Run Demineralizer Control Replacement Category Electric
New Project: Yes Account Number: Priority 2
Time-Line:
Total Project Cost: $65,000
Description
This project will replace the existing demineralizer control system with a state of the art solid state programmable controller. Replacement to be
completed in 2012.
The system has been reliable over its operating life, but parts are getting harder to find, and maintenance of the system controls is increasing. The
cost identified assumes the replacement of the controls only.
Justification
The existing demineralizer system is a 1960’s vintage. Replacing of the existing controls on the system would improve reliability. Replacement
parts for our current system are becoming obsolete and hard to locate.
If we were to have a major problem with the demineralizer system, it could impact the unit run time and could result in a forced outage. Repairs
requiring an extended outage of the demineralizer system would require having a portable demineralizer brought in and temporarily hooked up
until the repairs were made and the system put back in service.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 65,000 65,000
Total 65,000 65,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 65,000 65,000
Total 65,000 65,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 36
Page 133
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 12-ELPWR-03
Useful Life Unknown
Project Name McKee Run Unit 3 Boiler Systems Category Electric
New Project: Yes Account Number: Priority 1
Time-Line:
Total Project Cost: $510,000
Description
This project will perform inspections of boiler systems to evaluate the remaining life of critical boiler and supporting system components.
Subsequent to those inspections, repair/ replacement costs will be developed for the major boiler components. Additionally, major critical
equipment of supporting systems which have already been identified as needing replacement or refurbishment will be addressed in this project.
Major equipment includes the following: Boiler, ID and FD fans and motors, boosted overfire air fan and motor. This is a multi-year project
beginning in 2012 and continuing into 2017. In general, most work activities will require planned outages and therefore will be scheduled to
coincide with planned outages.
Justification
Critical system equipment represent components that, if they fail, will result in lose of generation and or capacity. Identifying the condition of
critical components will allow for proper prioritization of maintenance activities and resources. Delaying this project could result in the failure of
critical unit equipment and subsequent loss of generation and or capacity. More importantly, component failure could also result in safety risk to
personnel
This project will performed concurrently with several other projects intended to determine the condition of the all McKee Run Unit 3 critical
equipment. Reference McKee Run Unit 3 Turbine Inspection Project and McKee Run Unit 3 Auxiliary System Component Project.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Construction/Maintenance 90,000 93,000 70,000 253,000 157,000
Other 10,000 15,000 25,000
Total
Miscellaneous 30,000 35,000 10,000 75,000
Total 130,000 143,000 80,000 353,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 130,000 143,000 80,000 353,000 157,000
Total 130,000 143,000 80,000 353,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 37
Page 134
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 12-ELPWR-04
Useful Life Unknown
Project Name Van Sant Unit 11 Component Replacements Category Electric
New Project: Yes Account Number: Priority 1
Time-Line:
Total Project Cost: $147,000
Description
Replace or procure capital equipment valued between $5,000 and $25,000. Equipment includes the following:
Process equipment motors (2012) - $22,000 and (2014) - $7,000
Station critical system pumps and blowers (2012) - $15,000 and (2014) - $30,000
Cooling/Circulating Water pumps and motors (2012) - $13,000 and (2014) - $10,000
Rebuild of Black Start- Starting Diesel Engine (2014) - $30,000
Air Intake System Filtration System (2014) - $20,000
This project will be implemented in 2012.
Justification
This project is required to fund the replace of capital items that are expected to reach their useful life in 2012 and beyond and will need to be
replaced or refurbished to maintain plant system and unit reliability.
Extended equipment and /or unit outage time will result from lack of funding this project. This will have a direct effect on the cost of energy during
the extended outage time as well as increase future energy capacity charges.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Equip/Vehicle/Furnishings 50,000 97,000 147,000
Total 50,000 97,000 147,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 50,000 97,000 147,000
Total 50,000 97,000 147,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 38
Page 135
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 12-ELPWR-05
Useful Life Unknown
Project Name McKee Run Preservatoion of Structures Category Electric
New Project: Yes Account Number: Priority 6 --
Time-Line:
Total Project Cost: $80,000
Description
This project includes sandblasting and painting the plant structures along with the retirement of equipment placed out of service. This work will be
completed over several fiscal year budgets starting in 2012 and completing in 2014
Justification
Structural steel painting is needed in various areas throughout the plant proper as well as various outbuildings on the plant property to maintain the
physical building structures and equipment in an acceptable condition and prevent further deterioration. This project represents a minimum
preservation and maintenance of structures consistent with the expected life of the station. Consequences of delaying or eliminating this project
will result in the acceleration of deterioration of plant structures and larger future costs associated with strutual repairs.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Construction/Maintenance 38,000 42,000 80,000
Total 38,000 42,000 80,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 38,000 42,000 80,000
Total 38,000 42,000 80,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 39
Page 136
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 12-ELPWR-06
Useful Life Unknown
Project Name Unit 3 Cooling Waterline Life Extension Category Electric
New Project: No Account Number: Priority 4
Time-Line:
Total Project Cost: $375,000
Description
This project will inspect and repair the underground cooling water line from the Unit 3 condenser to the cooling tower. A condition assessment and
life evaluation will be performed on this pipe in 2012 to develop a repair/replace action plan to address the suitability for continued operation as
well as extending the life of the piping beyond 2015. The actual repairs will be completed in 2015. The condition assessment will be completed in
2011 with the repair/construction work to be completed in 2015.
The results of the condition assessment will determine what action plan will be developed. The budgeted costs assume repairs of the lines (2) from
the cooling tower to the plant exterior wall.
Justification
The condition of the underground cooling water line has required numerous repairs over the life of the plant and is expected to reach its useful life
in the 2012-2015 time period. It is expected that the repair frequency will accelerate over the next several years as the internal pipe coating
continues to degrade.
Delaying this project beyond 2015 will increase the risk of a failure causing an extended unit outage to repair or replace the failed pipe as well
incur water spillage to the ground. Additional budget dollars will need to be allocated to repair/ replace sections of piping.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Other 25,000 25,000
Miscellaneous 350,000 350,000
Total 25,000 350,000 375,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 25,000 350,000 375,000
Total 25,000 350,000 375,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 40
Page 137
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 13-ELPWR-01
Useful Life 15-20 years
Project Name McKee Run Units 1 & 2 Stack Repairs Category Electric
New Project: No Account Number: Priority 1
Time-Line:
Total Project Cost: $75,000
Description
Repairs to the stack lining and exterior will be made in order allow continued operation of these units. In addition, an assessment will be made to
determine the remaining life of the stack and also provide cost of any repairs required to extend the life of the stack for another 15 to 20 yrs. Due to
the reduced operation of Units 1 & 2, the project has been moved out to fiscal year 2013. Plans to perform regular assessments of the internal
damage to the common stack will determine when future repairs may be necessary. Severe damage may move the repairs to an earlier date however
the reduced run time of Units 1 & 2 may continue to afford the plant the ability to postpone repairs to a later date past the proposed.
The current expectation is to perform the repairs in fiscal year 2013.
A determination for the necessity of repairs to Units 1 & 2 common stack will be performed on an annual basis. An internal and external inspection
will be performed by outside consultant in 2011.
Justification
Current plans are to perform in-house inspections of the stack on an annual basis and to contract the repairs of the stack by outside contractors.
Delaying necessary repairs could lead to more costly repairs in the future, simultaneous unplanned forced outages on both Units 1 & 2, fall out of
internal material upon the surrounding community and potential injury to employees. Earnings from the sale of capacity may also be affected.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 75,000 75,000
Total 75,000 75,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 75,000 75,000
Total 75,000 75,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 41
Page 138
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Maintenance
Project # 14-ELPWR-01
Useful Life
Project Name McKee Run Unit 3 High Energy Piping Inspection Category Electric
New Project: Yes Account Number: Priority n/a
Time-Line:
Total Project Cost: $400,000
Description
This project will develop and implement a high energy piping inspection program for the Unit 3 piping systems. Included will be the main steam,
hot and cold reheat lines as well as feed water and condensate piping. This program is intended to prevent any long term stress or flow induced
pipe failures from occurring. Program development will be completed in the fall of 2014. The inspections will be completed during the spring 2005
planned outage.
Justification
High energy piping systems are subject to service related structural failure due to the high temperature service under which they operate.
Additionally, lower temperature piping systems are subject to accelerated corrosion rates due to flow characteristics. Identifying any such piping
before failures occur will prevent extended forced outage to make emergency repairs/replacement. Delaying this project could result in the failure
of critical piping systems and subsequent lose of generation and or capacity. More importantly, component failure could also result in safety risk
to personnel.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Planning/Design 40,000 40,000 80,000
Construction/Maintenance 280,000 280,000
Other 40,000 40,000
Total 40,000 360,000 400,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 40,000 360,000 400,000
Total 40,000 360,000 400,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 42
Page 139
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Improvement
Project # 14-ELPWR-02
Useful Life Unknown
Project Name Van Sant Unit 11 Major Overhaul/Inspection Category Electric
New Project: Yes Account Number: Priority n/a
Time-Line:
Total Project Cost: $2,000,000
Description
This project will perform major overhaul on unit due to OEM recommended repair frequency based on factored starts of the unit from first
commissioning and from last inspection/repair interval. This project will be implemented in 2014 with long lead material purchases and installation
in 2016.
Justification
This project is required to fund the purchase of all parts needed to perform a major overhaul on the unit based on estimated factored starts since
unit was first commissioned and since last the Hot Gas Path. This project will span the course of two years. In Year 1, the majority of the parts
will be purchased and services will be lined up for the actual installation on the unit in Year 2. Extended equipment and /or unit outage time will
result from lack of funding this project. This will have a direct effect on the cost of energy during the extended outage time as well as increase
future energy capacity charges. In addition, gradual degradation of the unit’s output could occur which would have a negative effect on the
capacity rating of the unit and could result in catastrophic failure of the unit.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Planning/Design 100,000 100,000 1,000,000
Miscellaneous 150,000 750,000 900,000
Total
Total 150,000 850,000 1,000,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total Future
Electric I & E Fund 150,000 850,000 1,000,000 1,000,000
Total 150,000 850,000 1,000,000 Total
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 43
Page 140
Fiscal 2011 Five Year Capital Investment FY 11 thru FY 15 Department Public Utilities-Power Plant
City of Dover, Delaware Contact Public Utilities Director
Type Equipment
Project # 14-ELPWR-05
Useful Life Unknown
Project Name McKee Run Hot Water Boilers Category Electric
New Project: No Account Number: Priority 5
Time-Line:
Total Project Cost: $70,000
Description
This project will replace the 2 existing hot water boilers with smaller more efficient (90 percent or better) boilers. This project will tie in the Units
1 and 2 plant heating system to the hot water system. This project was originally set up for 2011. The plant Hot water boilers would only be
supplying heat to the plant. The existing hot water boilers are 36 yrs old and have an efficiency of less than 85%.
Justification
A result of the conversion from residual to distillate oil as part of the pollution remediation project, the existing hot water boilers will no longer be
needed to heat oil. Therefore the only load on the hot water system will be for plant heating. The existing hot water boilers are grossly oversized
for this application and not suited for this seasonal operating mode. Additionally, the boilers are 36 years old and approaching end of life.
Replacing the existing boilers with properly sized boilers will reduce costs on monthly gas usage and reduced maintenance on existing boilers.
Installing more efficient boilers will also result in reducing the carbon footprint of the plant. The boilers are approaching end of life and are
requiring more frequent maintenance. Repalcing these in 2014 will reduce the potential for experiencing system outages and more expensive
repairs. Additionally, the sooner we replace the current boilers with the more efficient units the sooner we will realize payback on investment.
Expenditures FY 11 FY 12 FY 13 FY 14 FY 15 Total
Miscellaneous 70,000 70,000
Total 70,000 70,000
Funding Sources FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 70,000 70,000
Total 70,000 70,000
Budget Impact/Other
Produced using the Plan-IT Capital Planning Software 44
Page 141
City of Dover, Delaware
Electric - Vehicle Replacement Schedule
FY 11 thru FY 15
PROJECTS BY DEPARTMENT
Department Project# Priority FY 11 FY 12 FY 13 FY 14 FY 15 Total
Public Utilities- Electric Eng
2000 Dodge Utility Truck (784) 11Veh# 784 n/a 30,600 30,600
2000 Dodge Utility Truck (786) 11Veh# 786 n/a 30,600 30,600
2000 Dodge Pick Up Truck (731 14Veh# 731 n/a 19,000 19,000
2005 Ford SUV (741) 14Veh# 741 n/a 19,000 19,000
2005 Dodge Stratus (8) 14Veh# 8 n/a 18,000 18,000
Relay Bucket Truck 15Veh# NEW n/a 90,000 90,000
Public Utilities- Electric Eng Total 61,200 56,000 90,000 207,200
Public Utilities-Electric T&D
LM-42 Plow/Trencher 11Veh# 705 n/a 39,000 39,000
Trencher/Hoe (702) 12Veh# 702 n/a 45,000 45,000
2001 Doge Pick Up (740) 13Veh# 740 n/a 17,000 17,000
Public Utilities-Electric T&D Total 39,000 45,000 17,000 101,000
GRAND TOTAL 100,200 45,000 17,000 56,000 90,000 308,200
Produced using the Plan-IT Capital Planning Software 45
Page 142
City of Dover, Delaware
Electric - Vehicle Replacement Schedule
FY 11 thru FY 15
FUNDING SOURCE SUMMARY
Source FY 11 FY 12 FY 13 FY 14 FY 15 Total
Electric I & E Fund 100,200 45,000 17,000 56,000 90,000 308,200
GRAND TOTAL 100,200 45,000 17,000 56,000 90,000 308,200
Produced using the Plan-IT Capital Planning Software 46
Page 143
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held on March 22, 2010 at
6:00 p.m. with Chairman McGlumphy presiding. Members present were Mr. Leary, Mr. Salters,
Dr. Jones, and Mr. Shevock. Members of Council present were Mr. McGiffin, Mr. Hogan,
Mr. Ruane (arrived at 6:03 p.m.), and Council President Williams. Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Leary moved for approval of the agenda, seconded by Mr. Shevock and unanimously
carried.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of the Hiring Freeze
for Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review and
approval of the Legislative, Finance, and Administration Committee and City Council. It was
suggested that there be a “standing” agenda item to consider the filling of critical positions and, if
there are no positions to consider, the item could be removed.
Mr. McGlumphy noted that there were no critical positions to be considered; therefore, no further
action was required.
Presentation - Summary of Pay for Performance (PFP) Employee Meetings
Council President Williams reminded members that when the MAG overview of recommendations
was presented to the Committee during their meeting of November 23, 2009, staff was requested to
schedule dates for members of Council to meet with employees to assure their understanding and
provide them with an opportunity to comment before the plan is presented to Council. Further
discussion of the MAG Study was tabled until these employee meetings were held. She noted that
all members of Council were invited to attend the meetings.
After meeting with the employees, Council President Williams indicated that employee comments
were returned to the department to verify accuracy, submitted to the City Clerk, and then forwarded
to City Council.
Council President Williams reviewed a Presentation of the Summary of Pay for Performance (PFP)
Employee Meetings (Attachment #1).
Referring to the statement in the Presentation that “employees are told that Council is responsible
for current methodology”, Mr. McGiffin inquired what that methodology was.
Responding, Council President Williams explained that this refers to the fact that Council
implemented “across the board” pay increases, even though the pay for performance evaluation
system was being used. She indicated that the same methodology for pay increases was provided
for all employees regardless of whether or not employee goals were achieved.
Council President Williams stated that increases were considered during the budget hearings, and
a fixed rate increase for all employees was implemented to “correct” budgetary issues. She felt that
Council was not given information regarding the effect this would have on employees. She indicated
that, as a member of Council, she was not aware that employees who had completed a majority of
their goals, or in some cases all of them, would be treated the same as those employees who did not
complete their goals.
Page 144
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MARCH 22, 2010 PAGE 2
Mr. McGlumphy explained that some employees stated that they understood that the methodology
originally established was to provide pay increases based on performance, and they felt that the
methodology was changed by Council when across the board increases were provided. As a result,
he advised members that a majority of the employees relayed opposition.
It was Mr. McGiffin’s understanding that Council took the action to provide across the board pay
increases as a compromise measure due to the City’s economic situation at the time and that he was
aware of the effect of Council’s action in this regard; therefore, the results were clearly Council’s
responsibility.
In response, Council President Williams stated that when she voted in favor of the increase, it was
her understanding that the total 3.5% increase would be doled out according to pay for performance
procedures. When employees questioned the across the board raise, staff indicated that this was the
result of Council’s action and that they would need to talk to Council regarding this matter.
Mr. Hogan stated that his interpretation of Council’s action was the same as that of Mr. McGiffin.
He requested further explanation regarding the statement that “many executive decisions are
conducted without awareness or knowledge of Council”. Responding, Council President Williams
stated that employees provided information and data regarding executive decisions that were made
without the knowledge of herself, Mr. McGlumphy, or other members of Council who were present
at the meetings; however, the employees were advised that these decisions were vetted through
Council. She reiterated that she is serving as a messenger of information provided by employees and
assured members that she could review her notes to provide more specifics regarding this matter.
Dr. Jones questioned the supervisory authority/responsibility of the Human Resources Director based
on the correspondence and information regarding Mr. Peter Gregg (see Attachment #1) and on the
presentation under goal setting, bullet number two (2). Responding, Mr. DePrima, City Manager,
indicated that there is some confusion regarding the term “pay for performance”, which refers to the
evaluation system, but is being used in discussions which go beyond the evaluation. With regards
to Mr. Gregg, he explained that the concern is with the overall compensation system and not pay for
performance. Unfortunately, he stated, the term “pay for performance” has been used to discuss both
systems. Mr. DePrima advised members that there is an appeal process for the pay for performance
evaluation process. He stated that there is no appeal process for the compensation system, which
is relevant to the concerns relayed by Mr. Gregg. The compensation system is conducted by
consultants and is outlined in a report to the committee; therefore, there is no employee appeal
process. The compensation system addresses compensation points and has nothing to do with
Mr. Gregg’s evaluation.
With regards to the role of the Human Resources Department, Mr. DePrima stated that this
department is responsible for determining whether the grade indicated on an evaluation is justified
by the language provided. This justification is required for both high and low grades. In addition,
Mr. DePrima stated that the Human Resources Department is also responsible for assuring that the
goals are detailed (strategic, measured, attainable, realistically high, and time bound). The only role
the Human Resources Department has with the compensation system is to assure that the data
provided to the consultant is accurate.
Page 145
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MARCH 22, 2010 PAGE 3
Mr. McGlumphy suggested that Mr. DePrima review the presentation provided and respond to the
committee within the next month.
Responding, Mr. DePrima stated that there is an expectation among employees that Council will be
taking action regarding this matter. He reminded members that staff presented the MAG overview
of recommendations to the Committee in November 2009 and that there were 21 recommendations
for improvements to the pay for performance system, there was a policy presented, and that
employees have waited for four (4) months for action. It was his feeling that to delay action for
another month would be unfair and requested that the MAG overview of recommendations be
discussed at the next Legislative, Finance, and Administration Committee meeting.
Mr. Leary moved to recommend that this matter be tabled until the next Legislative, Finance,
and Administration Committee meeting and that the Chair do his best to assure this is an
agenda item to allow for discussion at that time. The motion was seconded by Mr. Salters and
unanimously carried.
Latest Estimate (LE) for Fiscal Year 2010 Budget
Mrs. Teresa Tieman, Senior City Administrator, reviewed the Latest Estimate (LE) for the Fiscal
Year 2010 Budget. She advised members that the purpose of the report is to provide City Council
with a recent estimate of the City’s Budget for FY 2010. Mrs. Tieman explained that the report
contains a series of revisions that were made to the City’s Budget, which include the Prior Year
Balance, Loss of Municipal Street Aid, impact of the Fraternal Order of Police (FOP) Settlement,
and revised expenses for power supply and generation that positively impact the Electric Fund. She
also noted that during the City Council meeting of January 25, 2010, members were provided with
the Quarterly Revenue Report as of December 2009, which included deductions in revenue as well
as any changes to the Utility Forecast models and have been reflected in the latest estimate.
Mrs. Tieman also indicated that the impact of the reduced number of furlough days for non-
bargaining, FOP, IUE, and IBEW employees from 11 to 9 days is detailed in the report. Hiring
freeze reductions, which include reductions in benefits, are also reflected in this update. A second
shift of ambulance coverage and the estimate for the winter snowstorms of 2010 are also included
in this latest estimate.
Mrs. Tieman advised members that the General Fund balance projection will not meet the financial
policy criteria. She explained that the fund balance is equal to approximately 7.87% of revenues and,
while not compliant, it is close to the policy of 8% of revenues. Mrs. Tieman stated that the Water
and Wastewater Fund balance exceeds policy guidelines of 12%: Water is 25% ($676,265 in
excess) of revenues and Wastewater is 27.6% ($533,562 in excess) of revenues. She indicated that
the Electric Fund balance is in compliance with policy, noting that the current fund level is 11.6%
of the fund balance.
Responding to concerns of Mr. Ruane, Mr. Anthony DePrima, City Manager, stated that most of the
Water/Wastewater projects are being financed this year through loans and bonds. He noted that the
biggest expense in the Wastewater fund is the Inflow and Infiltration (I&I) expenses. Mr. DePrima
stated that the City would have to take action to address the shortfall in revenues and reminded
Page 146
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MARCH 22, 2010 PAGE 4
members that this was mentioned during the Council Retreat on January 25, 2010. He assured
members that departments are taking every action available to reduce expenses; however, he noted
that although the large decrease in expenses is necessary, it is difficult when all capital projects have
been eliminated.
Presentation - Comprehensive Annual Financial Report - Fiscal Year Ended June 30, 2009
Due to time constraints, Mr. McGlumphy stated that the Presentation of the Comprehensive Annual
Financial Report (CAFR) for Fiscal Year Ended June 30, 2009 would be deferred until the next
meeting.
FY 2011 Five-Year Capital Investment Plan (CIP)
Due to time constraints, Mr. McGlumphy stated that the FY2011 Five-Year Capital Investment Plan
(CIP) would be deferred until the next meeting.
Mr. Salters moved for adjournment, seconded by Mr. Leary and unanimously carried.
Meeting adjourned at 6:59 P.M.
Respectfully submitted,
William P. McGlumphy
Chairman
WPM/JS/jg/ac/rr/tm
S:\PACKETS\2010\Council\04-12-2010\03-22-2010 LF&A.wpd
Attachments
Attachment #1 - Presentation - Summary of Pay for Performance (PFP) Employee Meetings
Page 147
ATTACHMENT #1
LF&A Committee Meeting of 03/22/2010
Summary of Employee
Concerns
Pay For Performance
LF&A Committee Meeting of 03/22/2010
ATTACHMENT #1
Page 148
Quarterly Evaluations
Complicated
“Kicked Back” by HR due to high ratings
Excessive
Supervisors/managers believe if they are
doing their job, they are not needed
Time Consuming
May take as long as 1 – 5 hours
Page 149
Goal Setting
Goals are not coordinated or detailed
Between departments and throughout organization
Goals between managers and employees
Complicated by HR
Unnecessary wordiness
Redundancy in goal setting
“Kick Back” to HR due to high ratings
Goals are not always obtainable
Project goals are not eliminated when completed
or achieved
Page 150
Pay Increases
Job performance should not be rated by
“across the board” measures
Motion made during budget hearings without
deliberation and/or debate
Employees are told that Council is
responsible for current methodology
Many executive decisions are conducted
without awareness/knowledge of Council
Page 151
Hiring Promises
Ability to “catch up”, if hired below market
Inconsistent employment practices
Not given credit for job experience when transferring
between departments
Not given credit for previous job experience and/or
job training
Certified employees are not upgraded
Page 152
History of Pay for Performance
Instituted to save money
Awards best performers higher than others
Used to attract employees “below market” with
the expectation that they could rise quickly to
market level through performance ratings
Amended in 2002 to reduce larger salaries and
reclassify others
Set the stage for manipulation of Employee
Classification System in 2007
Page 153
Point Factor Analysis System
(Self Evaluating Questionnaire)
Factor Level
DATA RESPONSIBILITY 10
PEOPLE RESPONSIBLILITY 10
ASSETS RESPONSIBILITY 10
VOCATIONAL/EDUCATION PREPARATION 9
EXPERIENCE 9
MATHMATICAL REQUIREMENTS 9
COMMUNICATION REQUIREMENTS 9
JUDGEMENT 10
COMPLEXITY 9
IMPACT OF ERRORS 9
PHYSICAL REQUIREMENTS 9
EQUIPMENT USAGE 9
UNAVOIDABLE HAZARDS 9
SAFETY OF OTHERS 9
Multi-Dimensional Evaluation Criteria©, Quick Reference Guide Managerial Advisory Group, Inc. Page 2
Page 154
Revised Classification System
2007
Employees did not “self evaluate”
Employees were not interviewed by consultants
or senior management
Positions were downgraded without notification
A “generic memo” was issued with no avenue
for appeal
Although classification system was posted on the
website, employees were not told and found the
documentation under “Council Packets”
Page 155
Change in Revised 2007 System
Organization Value Criteria Added – 2007
Title Value
TRAINEE/APPRENTICE 0
EMPLOYEE 1
LEAD WORKER/OFFICE MANAGER 2
SUPERVISOR/COORDINATOR/FIRST LINE MANAGER 3
GROUP OR UNIT MANAGER - SMALL 4
GROUP OR UNIT MANAGER - LARGE 5
DEPARTMENT MANAGER/ADMINISTRATOR 6
SECOND LEVEL DIRECTOR- SUPERTINENDENT 7
DIRECTOR 8
DIRECTOR REPORTING TO CEO 9
OTHER (Describe) 10
Multi-Dimensional Evaluation Criteria©, Quick Reference Guide Managerial Advisory Group, Inc. Page 3
Page 156
Change in Revised 2007 System
No public presentation or employee notification
Only two employees knew – CM and HR
Only 10 employees were rated higher than zero
CM rated himself as zero (position is not affected by
rating because of contractual nature of employment)
Weighted unfairly to upgrade and/or promote chosen
personnel
Upgrades made only to employees reporting to CM
Other council appointed positions not upgraded in the same way
CM/HR/Consultants never knew about the specificity of
jobs because employees were never consulted
Two (2) positions remain unclassified – IT and FM
Page 157
Newest PFP Change - 2009
Replaces “Market” methodology
Not defined – employee lack of understanding
“Average of Range” not clear or documented
Every upgrade results in another range change
Four upgrade requests were presented from
7/21/8 to 2/23/09
The number of upgrade requests started at 24,
then 22, then 17, and finally, 3 employees
City Manager position is in all of these requests
Page 158
Conclusions
Require written descriptive evaluations
For all performance scores of 1, 4, or 5
Eliminate Organizational Level in the
Classification System
Require a Correction Plan
Establish Council Oversight Committee
Funding unsustainable if upgrading
continues with salary increases
Page 161
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE
A Special Parks, Recreation, and Community Enhancement Committee meeting was held on
March 24, 2010, at 10:00 a.m. with Chairwoman Russell presiding. Members present were
Mr. Ruane, Mr. Hogan (departed at 11:35 a.m.), Mrs. Horsey, and Mr. Lewis.
AGENDA ADDITIONS/DELETIONS
Mr. Hogan moved for approval of the agenda, seconded by Mr. Ruane and unanimously
carried.
Community Development Block Grant (CDBG) Application Review
Mrs. Harvey, Community Development Manager, noted that members would be serving as the
Community Development Block Grant (CDBG) Review Panel for the CDBG Applications for Fiscal
Year 2010. As such, members were provided a list of applicants and staff reports summarizing each
application, a CDBG interview schedule, a breakdown of Federal resources available for use and the
total amount of grant funds requested, CDBG scoring criteria, and a CDBG Grant Application
Review Sheet for each applicant. She requested that members summarize their evaluation of each
application on the CDBG Grant Application Review Sheet and provide a score based on information
presented. Mrs. Harvey explained that the numbers in parenthesis next to each measure indicate the
maximum score for a given category and that the maximum total points is 100.
Mrs. Harvey advised members that the total grant available for activities is $227,434 and explained
the allocation requirements of the grant, as follows:
CDBG Funds Allocation $274,000
Anticipated Program Income $ 10,292
Total CDBG Funds $284,292
20% of the grant must be allocated for $284,292
Program Administration x.20
$56,858
Grant Funds Available for Activities $227,434
Total Grant Funds Requested $433,938.37
Mrs. Harvey cautioned that, according to CDBG requirements, public service activities cannot
exceed 15% of the total grant amount ($42,643).
Oral Presentations
Each applicant was provided an opportunity to make oral presentations before the committee, as
follows:
GEM Properties - 217-219 West Reed Street - $14,350
Mr. David Pierson and Mr. Matthew Davis, Principals for GEM Properties, reviewed the grant
application, in the amount of $14,350. Mr. Pierson explained that the request is to introduce
Americans with Disabilities Act (ADA) upgrades to two (2), first-floor, one (1) bedroom apartment
Page 162
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2010 PAGE 2
units. Mr. Pierson stated that plans for the project include: 1) creation of two (2) ADA compliant
ramps on either side of the apartment house; 2) installation of new wooden gates at the front of the
apartment dwelling on both the left and right sides to facilitate ease of access to the dwelling units;
3) construction of a fence to divide the common backyard into two (2) distinct backyard areas;
4) installation of two (2) new ADA compliant back doors; and 5) creation of a “garbage can keeper”
on the front, left side of the building. He noted that the dwelling currently houses four (4) low to
moderate income residents.
In response to Mrs. Russell, Mr. Pierson noted that on-street parking is available for the dwelling and
there is no curb cut-out at the present time; however, the proposed ramps will provide gradual access
from the existing sidewalk. He noted that the purpose of the proposed gate would be to provide
security and that a gradual slope will be provided to grant access to the building entrance.
Mrs. Harvey indicated that, because the property is located in the Historic District, the project would
require review by the State Office of Historic Preservation.
First State Resource Conservation & Development Council, Inc. (RC&D) - $40,000
Ms. Christine L. Stillson, Project Director for the First State Resource Conservation & Development
Council, Inc. (RC & D) Emergency Home Repair Project, reviewed the grant application, in the
amount of $40,000, to make repairs to homes in Dover which are owned by very low income
homeowners. Members were provided a memo dated March 24, 2010, summarizing Ms. Stillson’s
remarks (Attachment #1). She stated that projects undertaken by her organization typically include
repairs of an emergency nature which involve heating systems, electrical work, plumbing, and roof
repairs, as well as smaller requests such as window replacement and construction of ramps for
handicapped individuals. Ms. Stillson noted that, to date, eight (8) homes within the corporate limits
of Dover have been repaired with the CDBG funds received last year. Over the past five (5) years,
RC & D has repaired 38 homes as a grant sub-recipient at an average cost of $2,500 per home. She
noted that the homeowners served represent a diverse population. Ms. Stillson stated that the funds
requested would provide repairs to an estimated ten (10) to fifteen (15) homes and the average repair
would be approximately $3,200. She noted that the organization strives to preserve the existing
stock of homes in Dover by supporting rehabilitation of owner-occupied, low income homes. She
emphasized that the need in this area continues to be great.
Connections Community Support Program - $15,000
Ms. Sarah Weimer, Grant Manager, and Ms. Leslie Catts, Director of Homeless Services, reviewed
the grant application, in the amount of $15,000, stating that funds are being requested to finance
motel stays for homeless people in Delaware. Ms. Weimer explained that there is frequently a
transitional period before homeless individuals can be accommodated in local shelters or permanent
supportive housing, and the provision of hotel vouchers helps to bridge that gap. She noted that two
(2) years ago, Connections received a $15,000 CDBG grant and, over a five (5) month period, was
able to assist 69 homeless people.
In response to Mr. Lewis, Ms. Weimer indicated that most clients are accommodated for a one (1)
week period at an average rate of $250-275 per week.
Page 163
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2010 PAGE 3
In response to Mr. Hogan, Ms. Weimer indicated that very few clients are repeat users, estimating
that out of the 69 clients served during the previous year, one (1) or two (2) returned for additional
services.
People’s Place II, Inc. - $9,338.37
Mr. Del Failing, Associate Director, People’s Place II, reviewed the grant application, in the amount
of $9,338.37, and advised members that the funding request is to upgrade the heating/ventilation/air
conditioning system at the Ruth Dorsey Emergency Homeless Shelter. He noted that this upgrade
will improve the energy efficiency of the HVAC system and will result in lower propane and electric
bills.
Responding to Mr. Hogan, Mr. Failing explained that People’s Place II, which is based in Milford,
was established in the 1970's and provides services as far north as Townsend and as far south as
Millsboro. He noted that the organization combats domestic violence by providing a variety of
services such as counseling, a 24-hour hotline, psycho-educational groups for batterers, treatment
for victims of violence, including youth and adults, and programs for veterans. Mr. Failing also
noted that the organization operates residential shelters and foster care homes. He stated that
People’s Place II assumed ownership and operation of the Whatcoat Shelter in Dover in October of
2009 and is performing a number of renovations to this site.
Responding to Mr. Ruane, Mr. Failing stated that the organization has not explored State or Federal
funding sources for grants related to projects that promote energy efficiency; however, he concurred
that this would be a good option to explore for other planned projects.
Central Delaware Habitat for Humanity (CDHFH) - $40,000
Ms. Jocelyn McBride, Executive Director, Central Delaware Habitat for Humanity (CDHFH),
reviewed the grant application, in the amount of $40,000, and explained that the request is to
rehabilitate the property located at 101 Jefferson Court in Dover. She explained that, in 2006, the
City of Dover declared this dwelling to be a dangerous property and began an environmental clean-
up. At the completion of the clean-up, the property was boarded up and, due to the economy, the
City was unable to sell the property until October 2009, when CDHFH purchased the property. The
property was completely gutted by the City, and the integrity of the structure remains solid.
Ms. McBride noted that it is the goal of CDHFH to renovate the dwelling to be a simple, decent,
affordable home for a moderate-income family. She stated that this project will benefit the
surrounding property owners, as well as the family who will occupy the home. Ms. McBride read
into the record a statement submitted by Mrs. Renai Comstock, one of the prospective property
owners, as follows:
“Hello, my name is Renai Comstock, and my family was selected as a partner family
with Habitat for Humanity. We chose a home to be rehabbed in the City of Dover,
101 Jefferson Court, to be exact. We chose this location because my husband works
in Cheswold and I work in Dover, so it is kind of in the middle for us. Also, my
children go to school in the Caesar Rodney School District, and it is important for us
to reside in Dover because Dover has been very welcoming to our family since we
moved here in March of 2008. We will not only have the opportunity to purchase our
Page 164
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2010 PAGE 4
own house, we will now finally have a home - a place for our children to feel safe
and have no more worries for our future. Habitat has been a Godsend to our family.
So, in closing, I would like to just say thank you to Habitat for this generosity, and
to the City of Dover for having such a beautiful city to call home.”
Ms. McBride stressed that CDHFH has operated very successfully in the area, having built 12 homes
within Dover City limits, none of which have been foreclosed on and two (2) of which have been
paid off. She indicated that this project would be the first renovation project for the organization,
noting that typically their dwellings are constructed from the ground up.
Diamond State Community Land Trust (DSCLT) - $40,000
Mr. Van Temple, Executive Director of the Diamond State Community Land Trust (DSCLT),
reviewed the grant application, in the amount of $40,000, and advised members that the request
would allow for the purchase and thorough renovation of one (1) single-family home in Northwest
Dover Heights, Lincoln Park, or surrounding areas for a low-income family. He noted that one of
the criteria for selecting the home will be the roof orientation and size, so that solar panels can be
installed to provide energy for solar hot water and possibly electricity generation to achieve
maximum benefit from these renewable energy investments. Mr. Temple provided members with
a cost breakdown for the Dover Community Development Block Grant (CDBG) Request
(Attachment #2) for review.
In response to Mr. Hogan, Mr. Temple indicated that, under this program, the homeowner will
purchase the home; however, DSCLT will retain ownership of the land. The homeowner will sign
a 99-year renewable lease for exclusive rent of the land for a set, below-market fee of $40 per month.
Mr. Temple explained that the rental fees collected by DSCLT help to fund the organization. In
addition, he stated that, under this model, DSCLT homes are affordable not only for the first time
buyer but for future buyers of the property as well.
In response to Mr. Ruane, Mr. Temple explained that CDBG funds would be used for the purchase
of the land rather than for renovations. Mrs. Harvey confirmed that this is an eligible use of CDBG
funds.
Mr. Hogan suggested that pictures of properties and a map with a description of the location would
be useful in evaluating applications in the future.
Tolano and Cathy Anderson - 301-305 West Loockerman Street - $62,500
Due to the failure of the applicant to appear, Mr. Ruane moved to recess the meeting until
12:30 p.m., seconded by Mr. Lewis and unanimously carried.
Meeting recessed at 11:35 A.M.
There being no objections, Mrs. Russell reconvened the meeting at 12:35 P.M.
Page 165
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2010 PAGE 5
Mrs. Ann Marie Townshend, Director of Planning and Community Development, stated that
Mr. Hogan would not be present for the afternoon portion of the meeting and noted that he had
provided a score for all applications reviewed during the morning session.
City of Dover Streets Project - $100,000
Mr. Anthony DePrima, City Manager, and Mr. Scott Koenig, Public Services Manager/Director of
Public Works, reviewed the grant application, in the amount of $100,000. Mr. DePrima reminded
members that the Community Development Block Grant (CBDG) program was created by the
Federal government to assist local governments in providing for the needs of low and moderate
income residents. He explained that municipalities are often shouldered with providing
infrastructure repairs such as street, sewer, and sidewalk work, in neighborhoods where property
values are not high and there is not a great amount of tax income. For this reason, he stated, the
Federal government incorporated a category for public infrastructure improvements within the
CDBG program. Mr. DePrima explained that the City of Dover is facing reduced revenues and
increased costs and needs funds for street improvements in low and moderate income
neighborhoods. In addition, he reminded members that three (3) to five (5) years ago, the Committee
made a commitment to fund street improvements over a series of years and, as a result, new
sidewalks were constructed and repaving was done in the area north of Loockerman Street on New,
Queen, Kirkwood, and West Streets. He noted that, if funds were approved, target areas would likely
include Mitscher Road or other streets where a majority of residents are low or moderate income,
or streets located in a low or moderate income census track. He added that the downtown area south
of Loockerman Street should also be addressed at some point.
Mr. Koenig explained that the City of Dover manages just over 100 miles of streets and alleys and
this network is growing. He noted that there are a number of streets throughout the City which are
aging and the past winter has been very hard on pavement. He explained that street funding is
typically drawn from the City’s General Fund as part of an annual appropriation request received
from area legislators under the Community Transportation Program (discretionary funds that
legislators can use for transportation-related projects), or has been funded through CDBG grants.
Mr. Koenig noted that receiving CDBG funds would allow staff to leverage additional funds for an
overall City street program. He advised members that a large number of individuals would benefit
from the program.
In response to Mr. Ruane, Mr. DePrima noted that South Queen and South New Streets are both in
very bad condition, but neither are in a low to moderate income census track; therefore, residents on
these streets would have to be surveyed to prove a majority of low and moderate income.
Mr. Koenig stated that South New Street from Loockerman Street down to Water Street is the third
worst pavement section on the project list and was last paved in 1982. He estimated the cost of the
project at between $225,000 and $250,000.
He requested the opportunity to return to the Committee with a proposal for an allocation for the
streets program from future CDBG allocations. Mr. DePrima noted that receiving a multi-year
commitment from the Committee to address a particular area, possibly the South New and South
Page 166
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2010 PAGE 6
Queen Street area, would enable staff to develop an area-wide strategy to present to legislators and
City Council in order to leverage funds from the General Fund and discretionary funds.
Mr. Ruane stated that if funds were allocated to the Streets Project, his preference would be to know
specifically which area would be targeted.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, indicated that
some City streets are located in an approved low to moderate income census track and, therefore,
automatically meet CDBG requirements, whereas other areas would potentially require a survey.
She noted that the 2010 census data should be available next year and could alter the requirement
for a survey.
City of Dover - Housing Rehabilitation Program - $60,000
Mrs. Tracey Harvey, Community Development Manager, reviewed the grant application, in the
amount of $60,000, and explained that the request is for funds to be used in the City of Dover’s
Housing Rehabilitation Program to rehabilitate up to five (5) houses. She noted that the program’s
2008 waiting list has been depleted and all applicants have been served. In January, the waiting list
was reopened and 20 applicants have been placed on that list. Mrs. Harvey stated that remaining
funds from last year’s program will be used to repair four (4) to five (5) homes, and another four (4)
to five (5) homes are planned for renovation in the fall, so a total of eight (8) to ten (10) homes will
be rehabilitated during the year. She noted that the program has been very successful and there is
a great demand for it.
Mrs. Horsey stated her support for this program as it assists in bringing houses up to code and allows
residents to continue to occupy their dwellings.
Home Ownership Assistance Program (City of Dover Community Development Project) - $50,000
Mrs. Tracey Harvey, Community Development Manager, reviewed the grant application, in the
amount of $50,000, and explained that the request is for funds to provide five (5) first time home
buyers with down payment assistance or closing costs to purchase affordable housing in the City of
Dover. She noted that there is a great need for this program, that all FY 2009 project funding has
been expended, and that she has received numerous calls of interest from potential homeowners and
housing providers in Dover.
Review/Scoring of Community Development Block Grant (CDBG) Applications
Members reviewed and discussed the various CDBG grant applications to develop a score for each
applicant.
Mr. Ruane moved that the application for grant funds for 301-305 West Loockerman Street
not be reviewed any further by the Committee, due to the failure of the applicant to appear
for the interview, although staff provided him with a letter notifying him of the date and time
of the scheduled CDBG review and discussed this further with him by telephone. The motion
was seconded by Mrs. Horsey and unanimously carried.
Page 167
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2010 PAGE 7
Mr. Ruane suggested that future application packages contain a statement indicating that a time and
date will be set for application review by the Committee and that failure to attend will result in
withdrawal from consideration.
Mr. Lewis suggested that the package include a request to the applicant to return a written
acknowledgment of receipt.
Mr. Ruane expressed his support for the City of Dover Streets Project; however, felt that targeted
areas should be identified so that funds are not blended into the General Fund.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, explained that
funds could not go into the general program and must be spent on an eligible street. She noted that
the Committee could request by motion that staff provide a list of recommendations of targeted
areas; however, she noted the challenges of the timeframe involved since there is no way to
anticipate what legislators will allocate for streets during the next fiscal year.
After a period of discussion, members conducted a review of each grant application and provided
individual scores on the CDBG Grant Application Scoring Sheet for all applicants (as on file in the
Office of the City Clerk), and staff tallied the scoring sheets. Members agreed to fund the First State
Resource Conservation District (RC&D), Connections Community Support Program, Central
Delaware Habitat for Humanity, and the City of Dover Housing Rehabilitation Program at 80% of
the requested level, and to allocate the remaining funds to the City of Dover Streets Program.
Based on the scoring of the grant applications, it was noted that the Committee supports the
distribution of the CDBG grant monies, as follows:
Amount Amount
Applicant Requested Recommended
First State Resource Conservation
and Development Council (RC & D) $ 40,000 $ 32,000
Connections Community Support Program $ 15,000 $ 12,000
Central Delaware Habitat for Humanity $ 40,000 $ 32,000
City of Dover Streets Program $ 100,000 $ 63,434
City of Dover Community Development Projects:
Housing Rehabilitation Program $ 50,000 $ 48,000
Homeownership Assistance Program $ 50,000 $ 40,000
Mr. Ruane moved to recommend approval of the distribution of the Community Development
Block Grant (CDBG) monies based on the scoring of the grant applications conducted by the
Committee. The motion was seconded by Mr. Lewis and unanimously carried.
Mrs. Horsey moved for adjournment, seconded by Mr. Lewis and unanimously carried.
Meeting Adjourned at 2:11 P.M.
Page 168
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2010 PAGE 8
Respectfully submitted,
Sophia R. Russell
Chairwoman
SR/JS/ac/tm/rr
S:\PACKETS\2010\Council\04-12-2010\03-24-2010 SPECIAL PR&CE.wpd
Attachments
Attachment #1 - Memo dated March 24, 2010 -Grant Request for Community Development Block Grant 2010-11
Attachment #2 - Cost Breakdown - Dover CDBG Grant Request
Page 169
ATTACHMENT #1
PR & CE Committee Meeting of 03/24/10
Date: March 24, 2010
To: Parks, Recreation and Community Enhancement Committee
City of Dover
From: Christine L. Stillson, Housing Programs Director
Emergency Home Repair Project
First State Resource Conservation and Development Council, Inc.
1221 College Park Drive, Suite 100, Dover, DE 19904
RE: GRANT REQUEST FOR COMMUNITY DEVELOPMENT BLOCK
GRANT, 2010-2011
The Emergency Home Repair Project’s umbrella organization is the First State
Resource Conservation and Development Council, Inc., otherwise known simply as
RC&D.
The RC&D Council is a 501 ( c )( 3) nonprofit organization. The Emergency Home
Repair Project is one of several programs of the Council. I have enclosed in your
packet more information about the RC&D Council and its ongoing programs.
I am here today in support of our funding request for a CDBG Sub-recipient grant
for the coming Fiscal Year 2011. We are requesting $40,000.00 for the Council’s
Emergency Home Repair Project to address repair issues of homes located in the
City of Dover.
The Project assists very low income homeowners to make repairs to eliminate a
housing condition considered to be an immediate health or safety hazard. There is
no cost to the homeowner, but the homeowner is encouraged to participate in the
repairs or the solution to the repair problem. The homeowner must qualify as low
income as defined by HUD income quidelines. We use total household income when
qualifying homeowners for assistance. ( ie: home with 3 persons: $26,800)
We have been working quietly in Dover (and throughout Kent and Sussex Counties,
for that matter) for many years, but as the need and the cost of repairs have
increased we looked for partnerships—in this case, with the City of Dover through
the CDBG grant program. We have very much appreciated being a partner and
recipient of CDBG grant funds for the past five years.
Page 170
SOME FACTS
To date, over the past five years, thirty – eight (38) homes have received repairs
through the CDBG sub-recipient grant funding to the RC&D Emergency Home
Repair Project. Eight (8) homes have received repairs so far this year through this
year’s grant ( during the period July through March, 2010).
Repairs have traditionally averaged approximately $ 2,500 per home, with a range
this year from $ 985 to $4,700. The higher cost repairs involved roofs.
Over the years, typical repairs included: replacement of furnaces, electrical repairs,
plumbing repairs, construction of entrance steps and wheelchair ramps, modifying
bathrooms for safety and accessibility, replacement of broken windows, roof repairs
or replacements, and the installation of hardwired smoke/co detectors. The repaired
38 homes were located throughout the city, including addresses on the following
streets:
South Kirkwood West Bradley
North Kirkwood Forest Forest Creek
North Governors Carvel Drive Barrister Place
North Queen Ann Crawford
North West Court Bertrand
North New Carol Spruance
South Hancock South Little Creek River
Quail Hollow Drive Primrose Court
Homes receiving repairs this year to date were located on Schoolhouse Lane, Quail
Hollow Drive, Primrose Court, Forest Street, Carol Street, North Kirkwood, and
North Governors.
COMMENTS REGARDING DOVER’S COMMUNITY DEVELOPMENT
STRATEGIC PLAN
In reference to the current goals of Dover’s Community Development Strategic
Plan, the RC&D Council is in full support of the Plan and its housing goals,
specifically to “preserving the existing housing stock.”
To the point, the RC&D Council supports the rehabilitation of owner occupied
homes of families who are low income.
And as a current sub-recipient of CDBG funds, we can attest to the need for
continued funding to make repairs and bring substandard housing up to code
whenever possible.
We look forward to your continued support in making homes safer within the city
limits of Dover.
Page 171
ATTACHMENT #2
PR & CE Meeting of 03/08/10
Diamond State CLT March 24, 2010
DOVER CDBG GRANT REQUEST
AFFORDABLE HOMEOWNERSHIP, PERMANENT AFFORDABILITY
Project: one single-family home in Northwest Dover Heights, Lincoln Park.
Thoroughly renovated with energy-efficiencies including solar hot-water &
solar panels.
Homebuyer: family at 60% Area Median Income (AMI) or below ($35,700
or less for a family of four using HUD 2009 figures).
Economics:
Acquisition $100,000
Rehabilitation, Holding, misc. $29,500
Renewable Energy Investment $20,000
Total Development Cost: $149,500
CLT Sales Price $95,000 affordable to
50% AMI
Interim GAP: $54,500
Dover CDBG - requested $40,000
Other Sources - requested $14,500
Final GAP: $0
Timing:
Acquisition planned for August/September 2010
Rehabilitation & energy enhancements - October-November
Sale period - December-January
Relationship with owner-occupant - continuing
THANKS FOR CONSIDERING OUR REQUEST!
363 Saulsbury Road Dover, DE 19904
Page 172
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee Meeting was held on March 24, 2010, at
6:00 p.m. with Chairman Slavin presiding. Members present were Mr. Hogan, Mrs. Russell (arrived
at 6:10 p.m.) , Mr. Davis, and Mr. Harmon (arrived at 6:06 p.m.) . Councilman Ruane was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Davis requested the addition of Item #4, Discussion - Concerns Related to New Traffic Light
on Rt. 13 (at Gena’s Steaks and Kirby & Holloway Crossover).
Mr. Hogan moved for approval of the agenda, as amended, seconded by Mr. Davis and
unanimously carried.
Truck Route Traffic: West of Dover through Bicentennial Village
Mr. Scott Koenig, Public Services Manager/Director of Public Works, advised members that a
complaint was received from a resident regarding noise and danger to pedestrians due to commercial
trucks traveling on residential roads, including Walker Road and Independence Boulevard extending
to Superfresh/Ace Hardware. The complainant requested that signs prohibiting trucks over
5,000 lbs., except for local deliveries, be placed in these areas. Mr. Koenig stated that this request
was approved and that signs would be installed on Walker Road and just past the northbound
entrance of Superfresh by March 26, 2010.
Mr. Koenig stated that the same resident requested the installation of similar signs on Walker Road
from Saulsbury Road to Kenton Road, on College Road from Saulsbury Road to Kenton Road, and
on Fire School Road. He indicated that a letter to the Delaware Department of Transportation
(DelDOT) has been drafted and, if approved, City-maintained signs will be installed at those
locations as well.
Mr. Koenig further mentioned that there might be a need for signs to warn drivers that truck traffic
is prohibited on certain streets to help police with enforcement.
Mr. Koenig stated that another component of the complaint was noise from motorcycles and loud
mufflers; however, he noted that these issues cannot be addressed by the Public Services
Department.
Police Chief Jeffrey Horvath stated that after the signs have been installed, soft enforcement, with
the issuance of warnings, will be in effect for up to two (2) weeks. He further mentioned that the
noise complaints are city-wide and will be enforced with tickets; no warnings will be issued.
Responding to Mr. Gary Laing, DelDOT Community Relations Officer and Public Relations Liaison,
Mr. Anthony DePrima, City Manager, stated that the sign verbage “Local Deliveries Only” is
acceptable to eliminate the need for custom signs.
In response to Mr. Harmon, Chief Horvath stated that information regarding “local deliveries only”
could be placed on the bottom of electric bills and on the City’s website. Mr. DePrima noted that
notifications would be sent out to the tenants at Greentree Shopping Center.
Page 173
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MARCH 24, 2010 PAGE 2
Mr. Hogan moved to recommend approval of the actions presented by staff and requested staff
to provide an update during the April 12, 2010 City Council Meeting. The motion was
seconded by Mr. Harmon and unanimously carried.
FY 2011 Five-Year Capital Investment Plan (CIP)
Members reviewed the FY 2011 Five-Year Capital Investment Plan (CIP). Mr. Anthony DePrima,
City Manager, offered to respond to any questions that members might have regarding the submitted
report.
Responding to Mr. Slavin, Mr. DePrima stated that the road life of a police vehicle is approximately
four (4) to five (5) years.
In response to Mr. Hogan, Mr. DePrima stated that the engine and rescue trucks for the Fire
Department are on a three (3) year cycle and the ladder trucks are on a fifteen year cycle.
Mr. DePrima advised members that he will hold a meeting with Fire Chief Sean Christiansen,
Mrs. Teresa Tieman, Senior City Administrator; and Mrs. Donna Mitchell, Controller/Treasurer, to
discuss longer finance terms on fire vehicles and fire vehicle replacement cycles.
Mr. Hogan moved to recommend acceptance of the report, seconded by Mr. Davis and
unanimously carried.
Update on Wyoming Mill Road Project (Gary Laing)
Mr. Gary Laing, DelDOT Community Relations Officer and Public Relations Liaison, advised
members that a public workshop to discuss the Wyoming Mill Project would be held at the Pitts
Center on April 21, 2010 from 4:00 p.m. to 7:00 p.m.
Mr. Koenig advised members that all phases of the construction project are fully funded and that no
additional matching funds would be required. He noted that utility construction will begin in the Fall
of 2010.
Mr. Laing noted the following:
• DelDOT has approved a request from the Dover/Kent County Metropolitan
Planning Organization (MPO) to prohibit left turns from westbound North
Street unto southbound West Street.
• Construction for the four (4) way traffic signal at the entrance/exit to Eden
Hill on North Street will begin as early as April.
• Construction on the transit hub will begin shortly and is funded through
Recovery Act monies in the amount of $4.4 M; buses from that location
should begin running as early as December 2010.
Page 174
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MARCH 24, 2010 PAGE 3
Responding to Mr. Slavin, Mr. Laing stated that the North State Street repaving project should begin
sometime in April.
In response to Mr. Ruane, Mr. Laing advised members that paving on south Governors Avenue
should begin in mid-to-late April; however, this has not been confirmed.
Discussion - Concerns Related to New Traffic Light on Rt. 13 (at Gena’s Steaks and Kirby &
Holloway Crossover)
Members were provided a letter from Mr. Clive Sadler regarding the traffic light installed at the
intersection of Route 13 and Lepore Road, between Kirby & Holloway and Gena’s Steaks
(Attachment #1). Mr. Slavin advised members that since this item was added to the agenda, no
action would be taken; however, the topic would be open to discussion.
Mr. Laing advised members that prior to the installation of the light, motorists were making poor
decisions, resulting in severe accidents, including side collisions and fatalities. The light was
installed to give motorists a safe amount of time to make a left turn.
Mr. Slavin requested that copies of any correspondence regarding this matter be forwarded to the
City of Dover.
Mr. Davis moved for adjournment, seconded by Mr. Hogan and unanimously carried.
Meeting Adjourned at 6:32 P.M.
Respectfully submitted,
Timothy A. Slavin
Chairman
TAS/RMR/js/ac/tm
S:\PACKETS\2010\Council\04-12-2010\3-24-2010 SA&T.wpd
Attachments
Attachment #1 - Letter from Mr. Clive Sadler
Page 175
ATTACHMENT #1
SA&T Committee Meeting of 03/24/10
Page 176
CITY OF DOVER
FINANCE DEPARTMENT
MONTHLY BUDGET REPORT
FEBRUARY 2010
PREPARED BY: FINANCE DEPARTMENT
PLEASE NOTE – THIS REPORT PROVIDES TOP LINE INFORMATION ON THE THREE MAJOR
OPERATING FUNDS. IF YOU WOULD LIKE ADDITIONAL INFORMATION, PLEASE FEEL
FREE TO CONTACT THE FINANCE DEPARTMENT.
Page 177
Page 2 of 7
City of Dover
Finance Department
Monthly Budget Report
February 2010
S
Strategic Objectives for Fiscal Year 2009 – 2010
1. Coordinate audit program with the Legislative, Finance & Administrative Committee. Meet all
deadlines as established in the audit program.
2. Fortis training and implementation for Payroll and Accounts Payable.
3. Each staff member will take three (3) in house Sungard training sessions.
ACTIVITY LEVELS
FY09 YTD FY10 YTD
BANK TRENDS
Number of Deposits Made 968 752
Total Amount of All Deposits $ 94,976,793 $ 90,965,032
PAYROLL
Hours % Amount Hours % Amount
Gross wages per registers 648,487 100.0% $ 14,509,363 667,463 100.0% $ 14,548,024
Wages and Hours Worked
Regular 556,316 85.8% $ 11,825,529 538,286 80.6% $ 11,348,826
All over time 22,547 3.5% $ 891,276 27,895 4.2% $ 1,071,027
Other Paid or Unpaid Wages and Hours
Vacation 40,102 6.2% $ 1,018,887 39,466 5.9% $ 1,019,082
Sick 15,085 2.3% $ 327,017 13,182 2.0% $ 297,058
Furlough - 0.0% $ - 15,780 2.4% $ -
Terminal Leave - Retiree Vacation/Sick Payout 4,107 0.6% $ 119,761 15,001 2.2% $ 447,669
Comp Time (Police) 3,180 0.5% $ 84,815 3,947 0.6% $ 120,772
Personal 1,522 0.2% $ 39,720 1,165 0.2% $ 31,242
Leave Without Pay 196 0.0% $ - 3,536 0.5% $ -
Other (description below) 5,434 0.8% $ 202,359 9,155 1.4% $ 212,347
Other includes: pay adjustments, military differential pay, committee meetings, worker compensation tracking/adjustments, etc.
Other Activity
Number of Pay Periods 18 18
Number of Payroll Checks Issued 7,973 7,800
Number of Pension Checks Issued 1,785 1,835
Total Pension Benefits Paid - Defined Benefit Plan $ 2,757,198 $ 2,894,563
ACCOUNTS PAYABLE
Number of Check Vouchers 4,312 3,638
Number of EFT Vouchers 1,304 1,164
Vouchers Dollar Amount Disbursed $ 88,824,523 $ 76,757,138
Page 178
Page 3 of 7
City of Dover
Finance Department
Monthly Report – February 2010
General Fund Summary
67% of
Revised Revised
Budget Budget YTD Balance Budget
Receipts
Beginning Balance $ 2,816,763 $ 3,628,890 $ 3,628,890 $ - 100.0%
Court of Chancery Fees 745,000 745,000 327,790 417,210 44.0%
Fines & Police Revenues 965,000 965,000 510,570 454,430 52.9%
Franchise Fees 486,000 486,000 250,566 235,434 51.6%
Grants 734,000 734,000 196,696 537,304 26.8%
Intrafund Services 4,475,714 4,475,714 2,715,504 1,760,210 60.7%
Library & Recreation Revenues 668,008 668,008 425,090 242,918 63.6%
Licenses & Permits 2,334,000 2,334,000 2,159,740 174,260 92.5%
Property Taxes (Includes BID Revenue) 10,237,938 10,237,938 9,999,675 238,263 97.7%
Sanitation Revenues 1,420,000 1,420,000 945,480 474,520 66.6%
Other Miscellaneous Revenues 348,785 348,785 190,161 158,624 54.5%
Transfers-In from Other Accounts & Utilities
Civil Traffic Penalties 700,000 700,000 433,742 266,258 62.0%
Municipal Street Aid Fund 775,200 - - - 0.0%
Transfer Taxes 1,400,000 1,400,000 493,413 906,587 35.2%
Water/Wastewater Fund 548,020 548,020 548,020 - 100.0%
Electric Fund 6,758,100 6,758,100 6,758,100 - 100.0%
Total $ 35,412,528 $ 35,449,455 $ 29,583,437 $ 5,866,018 83.5%
Expenditures
City Clerk & Council $ 403,264 $ 403,264 $ 219,517 $ 183,747 54.4%
Mayor, City Manager & Human Resources 1,074,989 1,078,989 655,691 423,298 60.8%
Police & Police Extra Duty 12,188,986 12,219,201 8,327,598 3,891,603 68.2%
Public Services 4,532,477 4,532,477 2,926,826 1,605,651 64.6%
Central Services 2,520,269 2,520,269 1,540,243 980,026 61.1%
Planning & Inspections 1,970,626 1,970,626 1,275,381 695,245 64.7%
Finance, Info Tech & Customer Services 2,557,920 2,557,920 1,633,546 924,374 63.9%
Library & Recreation 1,906,183 1,906,183 1,177,567 728,616 61.8%
Fire Department 750,445 750,445 469,980 280,465 62.6%
Assessor 572,526 572,526 367,134 205,392 64.1%
Debt Service 328,410 328,410 328,410 - 100.0%
Insurance 600,000 600,000 428,039 171,961 71.3%
Retirees' Health Care 1,014,820 1,014,820 641,355 373,465 63.2%
Street Lights 985,000 985,000 632,785 352,215 64.2%
Loss on sale of asset - - 42,993 (42,993) 0.0%
Transfer to CDBG 11,000 11,000 - 11,000 0.0%
Provision for Uncollectible 10,000 10,000 10,000 - 100.0%
Transfers Out
Capital Projects Fund 344,802 344,802 344,802 - 100.0%
Police Pension Fund 620,000 620,000 101,733 518,267 16.4%
Budget Bal-Working Capital 3,020,811 3,023,523 - 3,023,523 0.0%
Total $ 35,412,528 $ 35,449,455 $ 21,123,600 $ 14,325,855 59.6%
Reserve Balances
Contingency $ 645,254 $ 744,871 $ 759,098
Page 179
Page 4 of 7
City of Dover
Finance Department
Monthly Report – February 2010
Water/Wastewater Fund Summary
67% of
Revised Revised
Budget Budget YTD Balance Budget
Revenue
Beginning Bal-Water $ 662,079 $ 659,584 $ 659,584 $ - 100.0%
Beginning Bal-Wastewater 307,112 327,614 327,614 - 100.0%
Beginning Bal-Kent Co Sewer Adj. 100,194 (397,473) (397,473) - 100.0%
Water Fees 4,499,000 4,499,000 2,888,061 1,610,939 64.2%
Wastewater Fees 3,045,560 3,045,560 2,019,961 1,025,599 66.3%
Kent County Treatment Fees 3,435,390 3,435,390 2,077,904 1,357,486 60.5%
Water Tank Leases 293,669 293,669 184,060 109,609 62.7%
Miscellaneous 149,600 149,600 43,710 105,890 29.2%
Impact Fees - Water 280,000 280,000 133,500 146,500 47.7%
Impact Fees - Wastewater 475,000 475,000 207,100 267,900 43.6%
Total $ 13,247,604 $ 12,767,944 $ 8,144,021 $ 4,623,923 63.8%
Expenses
Engineering & Inspection $ 697,783 $ 697,783 $ 460,558 $ 237,225 66.0%
Water 458,333 458,333 261,628 196,705 57.1%
Water Treatment Plant 1,517,663 1,517,663 956,773 560,890 63.0%
Wastewater 988,455 988,455 587,441 401,014 59.4%
Water Meter Reading 72,533 72,533 43,811 28,722 60.4%
Construction & Inspection 410,338 410,338 285,257 125,081 69.5%
Kent County Treatment Fees 3,435,430 3,435,430 2,851,604 583,826 83.0%
Retiree’s Health Care 134,680 134,680 88,997 45,683 66.1%
Debt Service 832,951 832,951 298,851 534,100 35.9%
Intrafund Services 1,262,456 1,262,456 720,744 541,712 57.1%
Transfers Out
General Fund 548,020 548,020 548,020 - 100.0%
Water/Wastewater I & E Fund 700,000 700,000 700,000 - 100.0%
Impact Fee Reserve 110,062 110,062 - 110,062 0.0%
Budget Bal-Working Capital - Water 1,136,086 1,133,591 - 1,133,591 0.0%
Budget Bal-Working Capital - WW 842,660 863,162 - 863,162 0.0%
Budget Bal-Working Capital - KSA 100,154 (397,513) - (397,513) 0.0%
Total $ 13,247,604 $ 12,767,944 $ 7,803,684 $ 4,964,260 61.1%
Reserve Balances
Contingency-Water $ 122,431 $ 122,919 $ 121,034
Contingency-Wastewater $ 136,910 $ 137,452 $ 135,374
Impact Fee Reserve - Sewer NO BUDGET NO BUDGET $ 3,569,909
Impact Fee Reserve - Water NO BUDGET NO BUDGET $ 126,000
Bond Coverage Ratio (Covenant 1.20) 3.22 3.28 1.48
Page 180
Page 5 of 7
City of Dover
Finance Department
Monthly Report – February 2010
Electric Revenue Fund Summary
67% of
Revised Revised
Budget Budget YTD Balance Budget
Revenue
Beginning Balance $ 8,219,350 $ 11,415,737 $ 11,415,737 $ - 100.0%
Sales to Customers 99,533,042 99,533,042 65,644,617 33,888,425 66.0%
Utility Tax 1,781,500 1,781,500 1,298,260 483,240 72.9%
Weyandt Hall Rents 186,816 186,816 125,299 61,517 67.1%
Miscellaneous Revenues 1,621,284 1,621,284 1,083,831 537,453 66.9%
Intrafund Service Receipts Water/Wasterwater 270,626 270,626 117,808 152,818 43.5%
Total $ 111,612,618 $ 114,809,005 $ 79,685,552 $ 35,123,453 69.4%
Expenses
Power Supply & Generation
Power Supply $ 55,619,481 $ 55,619,481 $ 37,945,558 $ 17,673,923 68.2%
Power Supply Management/Incentive 3,000,000 3,000,000 2,007,266 992,734 66.9%
Capacity Charges 13,469,528 13,469,528 9,049,738 4,419,790 67.2%
Rate Stabilization Credit (3,000,000) (3,000,000) - (3,000,000) 0.0%
PJM Charges - Load 13,943,413 13,943,413 4,391,998 9,551,415 31.5%
Total Power Supply 83,032,422 83,032,422 53,394,560 29,637,862 64.3%
Plant Operations 5,798,710 5,848,710 3,325,152 2,523,558 56.9%
Generation Fuels 1,275,251 1,275,251 118,693 1,156,558 9.3%
Capacity Credits (12,133,285) (12,133,285) (8,099,324) (4,033,961) 66.8%
PJM Credits (1,701,066) (1,701,066) (314,556) (1,386,510) 18.5%
Total Generation (6,760,390) (6,710,390) (4,970,035) (1,740,355) 74.1%
Total Power Supply & Plant 76,272,032 76,322,032 48,424,525 27,897,507 63.4%
Electric Operating Divisions
Transmission/Distribution 3,318,622 3,318,622 1,948,690 1,369,932 58.7%
Electrical Engineering 1,500,012 1,500,012 862,123 637,889 57.5%
Administration 640,535 640,535 472,658 167,877 73.8%
Meter Reading 289,103 289,103 185,716 103,387 64.2%
Systems Operations 624,520 624,520 325,612 298,908 52.1%
Utility Tax 1,781,500 1,781,500 1,298,260 483,240 72.9%
Interest on Deposits 54,500 54,500 22,997 31,503 42.2%
Retirees Health Care 567,430 567,430 350,074 217,356 61.7%
Green Energy Payment to DEMEC 137,600 137,600 89,676 47,924 65.2%
Intrafund Services 3,483,884 3,483,884 2,112,568 1,371,316 60.6%
Accounts Receivable Write-Offs 135,000 135,000 135,000 - 100.0%
Inventory Write-Offs 175,000 175,000 175,000 - 100.0%
Contractual Services 2030 Committee 497,250 497,250 28,152 469,098 5.7%
Debt Service 3,956,600 3,956,600 2,712,073 1,244,527 68.5%
Transfers Out
Electric Improvement & Extension Fund 2,500,000 2,500,000 2,500,000 - 100.0%
General Fund 6,758,100 6,758,100 6,758,100 - 100.0%
Contingency Reserve 83,500 83,500 83,500 - 100.0%
Budget Bal. - Work. Capital 8,837,430 11,983,817 - 11,983,817 0.0%
Total $ 111,612,618 $ 114,809,005 $ 68,484,724 $ 46,324,281 59.7%
Reserve Balances
Contingency Reserve $ 1,036,069 $ 1,039,854 $ 1,029,895
Insurance Reserve $ 395,002 $ 396,603 $ 392,458
Rate Stabilization Reserve $ 1,718,613 $ 1,729,127 $ 4,728,951
Bond Coverage Ratio (Covenant 1.25) 1.60 1.81 1.91
Megawatt Hours Sold & Purchased
Sales to Customers MWh (excluding Street Lights) 747,193 747,193 487,017
Sales per MWh $ 135.594 $ 135.594 $ 137.455
Purchased/Generated MWh 788,808 788,808 504,232
All In MWh Supply & Generation $ 96.693 $ 96.756 $ 96.036
Page 181
Page 6 of 7
City of Dover
Finance Department
Monthly Report – February 2010
General Capital Project Fund Summary
67% of
Revised Revised
Budget Budget YTD Balance Budget
Revenue
Beginning Balance - Projects $ 375,408 $ 462,693 $ 462,693 $ - 100.0%
Transfer from General Fund for Projects 344,802 344,802 344,802 - 100.0%
Recreation Grant - - 470 (470) 0.0%
State Grant - Library 4,000,000 4,180,234 177,869 4,002,365 4.3%
Miscelleanous Receipts - - 25,000 (25,000) 0.0%
Library Bond Issue/Contributions 1,912,433 1,912,433 - 1,912,433 0.0%
Transfer from Library Reserve 3,000,000 3,180,235 166,769 3,013,466 5.2%
Interest Earnings 2,700 2,700 8,940 (6,240) 331.1%
Income from Sale of Assets - - 29,200 (29,200) 0.0%
Total $ 9,635,343 $ 10,083,097 $ 1,215,743 $ 8,867,354 12.1%
Expenditures
Fire $ 292,210 $ 292,210 $ 225,750 $ 66,460 77.3%
Library 8,912,433 9,272,902 381,434 8,891,468 4.1%
Recreation - 70,000 28,734 41,266 41.0%
Police 73,700 94,706 34,653 60,053 36.6%
Streets 350,000 350,000 40,314 309,686 11.5%
Information Technology 7,000 7,000 - 7,000 0.0%
Facilities Management - - 544 (544) 0.0%
Budget Balance - Projects - (3,721) - (3,721) 0.0%
Total $ 9,635,343 $ 10,083,097 $ 711,429 $ 9,371,668 7.1%
Reserve Balances
Capital Asset Replacement Reserve $ 242,074 $ 334,369 $ 246,586
Library Reserve $ 3,426,400 $ 3,671,078 $ 3,454,625
Parkland/Recreation $ 192,735 $ 218,245 $ 222,414
Page 182
Page 7 of 7
City of Dover
Finance Department
Monthly Report – February 2010
Water/Wastewater Improvement & Extension Fund Summary
67% of
Revised Revised
Budget Budget YTD Balance Budget
Revenue
Beginning Balance-Water $ 431,400 $ 1,631,844 $ 1,631,844 $ - 100.0%
Beginning Balance-Wastewater 219,375 625,152 625,152 - 100.0%
Department of Energy Grant - 45,248 - 45,248 0.0%
Income from Sale of Assets - - 2,821 (2,821) 0.0%
Interest Earned - - 29,773 (29,773) 0.0%
State Loan-Water 2,404,017 2,404,017 - 2,404,017 0.0%
State Loan-Wastewater 5,942,481 5,942,481 - 5,942,481 0.0%
Transfer from Water Operating Fund for Water 500,000 500,000 500,000 - 100.0%
Transfer from Wastewater Operating Fund for Wastewater 200,000 200,000 200,000 - 100.0%
Transfer from Impact Fee Reserve 518,230 518,230 - 518,230 0.0%
Total $ 10,215,503 $ 11,866,972 $ 2,989,590 $ 8,877,382 25.2%
Expenses
Water $ 2,987,317 $ 3,753,430 $ 389,371 $ 3,364,059 10.4%
Wastewater 6,539,110 6,912,942 130,352 6,782,590 1.9%
Water Construction 39,000 39,000 38,793 207 99.5%
Budget Bal-Working Capital - Water 309,100 753,431 - 753,431 0.0%
Budget Bal-Working Capital - Wastewater 340,976 408,169 - 408,169 0.0%
Total $ 10,215,503 $ 11,866,972 $ 558,516 $ 11,308,456 4.7%
Reserve Balances
Capital Asset Replacement - Water $ 184,698 $ 211,857 $ 209,538
Capital Asset Replacement - Wastewater $ 87,357 $ 67,514 $ 65,793
City of Dover
Finance Department
Monthly Report – February 2010
Electric Improvement & Extension Fund Summary
67% of
Revised Revised
Budget Budget YTD Balance Budget
Revenue
Beginning Balance $ 1,461,547 $ 2,625,760 $ 2,625,760 $ - 100.0%
Beginning Balance Bond Proceeds 1,378,257 4,240,034 4,240,034 - 100.0%
Bond Proceeds 1,958,107 - - - 0.0%
Interest Earnings 33,700 33,700 12,510 21,190 37.1%
Transfer from Electric Revenue Fund 2,500,000 2,500,000 2,500,000 - 100.0%
State Reimbursement for Projects - 710,318 257,885 452,433 36.3%
DEMA Grant for Security System - 105,723 33,724 71,999 31.9%
Green Energy Grant for Photovoltaic System - 135,152 - 135,152 0.0%
Total $ 7,331,611 $ 10,350,687 $ 9,669,913 $ 680,774 93.4%
Expenses
Power Plant $ 1,254,000 $ 1,875,290 $ 180,022 $ 1,695,268 9.6%
Transmission/Distribution 1,127,147 1,127,147 464,364 662,783 41.2%
Electrical Engineering 3,525,536 5,642,167 2,105,090 3,537,077 37.3%
Administration - 105,723 - 105,723 0.0%
Budget Bal. - Work. Capital 1,424,928 1,600,360 - 1,600,360 0.0%
Total $ 7,331,611 $ 10,350,687 $ 2,749,476 $ 7,601,211 26.6%
Reserve Balances
Depreciation Reserve $ 7,991,763 $ 8,079,990 $ 7,938,776
Future Capacity Reserve $ 8,900,651 $ 9,023,863 $ 8,931,250
Page 183
Dover Police Department
Monthly Report
To
Mayor & City Council
“To Protect and Serve”
February 2010
Page 184
March 16, 2010
Honorable Carleton E. Carey, Sr., Mayor
Members of Dover City Council
City Hall
Dover, DE 19901
Mayor Carey and Council Members:
The following is the report on Police Department activities for the month of February 2010:
COMPLAINTS
Total complaints received through February 28th, 6,000
numbered 4,264. This is an increase of 221 4,724
complaints over the same time period for last year. 4,525 4,544 4,264
4,043
4,000
2,000
0
2006 2007 2008 2009 2010
CRIMINAL INVESTIGATIONS
12
Cases Reported in
7
8 February
Cases Cleared in
3 3 3 February
4 Cases Cleared from
2
1 1 1 Previous Months
0
0
Burglary Robbery Rape
Page 185
Report to Mayor and Council
February 2010
Page 2
QUALITY OF LIFE TASK SECTION
ENFORCEMENT ACTION ARRESTS
ABANDONED VEHICLES 2
ALCOHOL VIOLATIONS 0
ASSIST OTHER 80
WARRANTS ON FILE 0
BIKE ON SIDEWALK 7
CITY PARK VIOLATIONS 0
CRIMINAL ARRESTS 16
DRUG RELATED ARRESTS 7
LOUD MUSIC 0
MISCELLANEOUS VIOLATIONS 1
PARKING VIOLATIONS 13
COLLECTION OF DELINQUENT DCO’S 0
MEETINGS 0
PROSTITUTION 0
WANTED CHECKS/CPC’S 9
WARNINGS/TRAFFIC ARRESTS 35
FUGITIVE 6
TOTAL ARRESTS 176
TRAFFIC ARRESTS
6,000
The department issued 3,175 traffic citations through this
reporting period. This is a decrease of 530 citations over the 3,343 3,705
number issued during the same period last year. 4,000 3,020 3,175
2,739
2,000
0
2006 2007 2008 2009 2010
TRAFFIC CRASHES
400
322 331 301 299
280 Through February 28th, Dover Police investigated 299 traffic
300 crashes. This is an increase of 19 accidents investigated during
the same period last year.
200
100
0
2006 2007 2008 2009 2010
Page 186
Report to Mayor and Council
February 2010
Page 3
911 CENTER
10%
During the month of February, our 911 Center handled a
total of 10,181 calls averaging 364 calls per day.
18% 911 Landline Dispatchers handled 1,840 calls on the 911 wireless lines,
911 Wireless an average of 66 calls per day and 1,012 calls on the 911
landlines, an average of 37 calls per day.
Administrative
72%
CITY ORDINANCE SUMMONS 2,400
1,732 1,523 1,693
Through February 28th, we issued 1,094 city ordinance 1,800
1,317 1,238
summons, a decrease of 144 summons over February of
1,065 1,049 1,094
last year. *Note: of those summonses issued in February, 1,200 882
21 were issued for handicapped parking violations, 19 for 686
fire lane parking violations, 28 for false alarms (21 for 3-5
600
alarms, 6 for 6-9 alarms, 1 for 10-15 alarms, and 0 for 16
or more alarms) and 7 for noise violations (4 for vehicle
violations and 3 for residence violations). 0
2006 2007 2008 2009 2010
ISSUED PAID
Listed below are the major crimes and activities that occurred during the month of February:
• On February 1, 2010 an indictment was returned against two parents charging them each with Murder by Abuse or
Neglect in the First Degree, Endangering the Welfare of a Child – Felony, and Abusing a Corpse. They were both taken
into custody on those charges today by Dover Police Department Detectives. The initial charges now pending in the Court
of Common Pleas will be terminated and the matter will proceed forward in the Superior Court.
• On Thursday, February 4, 2010, Detectives investigated the robbery of the Shore Stop Convenience Store located on
Forrest Avenue. The robbery occurred when two unknown black male suspects entered the store wearing ski masks and
one of the suspects brandished a handgun. The suspects demanded cash from the clerk.
• On Thursday, February 4, 2010, Officers from the Drugs, Vice, & Organized Crime Section and Safe Streets Section
executed a traffic stop on a vehicle and located a total of 1783.6 grams of marijuana, drug paraphernalia, and a loaded .45
caliber handgun.
• On Tuesday, February 9, 2010, a female victim was at WT Smithers using the ladies bathroom when the defendant, who
is not known to the victim, forced his way into her bathroom stall. The defendant then began to punch the victim in the
face and also struck her in the arm with a beer bottle. The victim was able to escape from the defendant and fled from the
bathroom. The defendant then fled from WT Smithers and two of the victim’s male acquaintances were able to give foot
pursuit. The acquaintances were able to catch the defendant and held him until police officers from Dover PD arrived on
scene. A further investigation revealed that the defendant had grabbed two other female's buttocks in WT Smithers prior
to assaulting the victim.
Page 187
Report to Mayor and Council
February 2010
Page 4
Major crimes and activities that occurred during the month of February continued:
• On Monday, February 22, 2010, an unknown black male approximately 6'00" wearing a black pullover Hooded
Sweatshirt entered an apartment at Brandywine Court and produced a handgun. The suspect then removed several
electronics and USC before fleeing in an unknown direction.
• On Monday, February 22, 2010, an unknown white male approximately 6'00" 190 lbs entered the business and grabbed a
30 pack of beer. He then exited the store without paying and when the clerk confronted him outside, the suspect produced
a handgun and fled.
• On Friday, February 26, 2010, a black male suspect shot another subject after the two were involved in a physical
altercation inside the Loockerman Exchange. The 27 year old victim was transported to Bay Health with a single gunshot
wound to the abdomen and is listed in stable condition. The suspect was later identified and arrested.
• On Friday, February 26, 2010, Detectives investigated an afternoon robbery of the WSFS Bank branch located in the
Dover Mart Shopping Center. Investigation revealed a lone subject approached a teller and handed her a note demanding
money. The teller turned over an undisclosed amount of money and the subject fled the bank.
• On Saturday, February 27, 2010, Dover Officers arrested a suspect for a rape and burglary which occurred in April of last
year. Follow up investigation and some of the stolen property from the incident, led detectives to the identity the
defendant. He was apprehended in Liberty Court and taken into custody without incident.
Respectfully Submitted,
Jeffrey Horvath
Chief of Police
Page 188
Monthly Report
February 2010
Office of City Assessor
Page 189
Assessor’s Office
Number of Deeds Stamped for the Month Transfer Tax Dollar Amount for the
of Feb. 2009/2010 Month of Feb. 2009/2010
19 40 30
20 14
Thousands
11 18
15 20
7 5 7 6 10
10
1 0 0 0 0 2 2009
5 0 0 2009
0
0 2010
2010
First Time Buyer for Month of Feb. Feb. 2009/2010 Realty Property Sales
2009/2010 in Dollars Received Prior to Recording
11 1,866
2,000
12
Thousands
1,500 1,206 1,345
10 833
7 7 Res. Non‐First 1,000
8 5 150
Time Buyers 2009 500 0 0
6 0
0
4 Res. First Time 2010
2 Buyers
0
2009 2010
Major Updates
Dec‐09 Jan‐10 Feb‐10
Assessment Change $5,791,000 $5,736,300 $1,844,900
Residential Sales Ratio Report
Sales in Study Total Assessed Value Total Sale Price Ratio PRD
10 $1,486,800 $1,561,200 0.95 0.87
Ratio – Assessed Value divided by Sale Price.
PRD – Mean – A PRD above 1.03 tends to indicate assessment regressivity – high valued properties are under
appraised relative to low valued properties. A PRD below .98 tends to indicate assessment progressivity – high
valued properties are relatively over appraised.
Page 190
Assessor’s Office
Points of Interest
Scanning & Filing
‐ All new deeds are being scanned and attached to the CAMA software for easy retrieval.
‐ All appeal documents and correspondence are being scanned and attached to the CAMA software for easy retrieval.
‐ All deeds from 2006 through current day are scanned and attached to our software.
‐ Hard Copies of original property record cards are being scanned and attached to the CAMA software for easy retrieval
of previous years history.
City Wide Revaluation
‐ New Value letters have been mailed!
Assessor’s Office
‐ Finalizing site for Appeal Hearings. Begin taking phone calls for Tyler Technologies.
Page 192
MEMO
PROJECT STATUS
DOVER, DE
To: Cheryl Russell, Assessor
From: Steve Beccio – Project Supervisor
Date: 2/26/2010
Staff currently assigned:
Project Supervisor: Steve Beccio
Clerical support: Nicole Colbert
PROJECT START UP
. Refer to Status Rpts 1/16/09 and 1/30/09.
Office space
The Assessor has provided Tyler/CLT office space within the Assessor’s office.
Address: Tyler Technologies/CLT
C/O City of Dover Assessor’s Office
P.O. Box 457
Dover, DE 19903
Phone: 302-760-4927 Fax: 302-736-4450
Photography
Photos have been attached to parcel records.
Van View has been implemented.
Routing
All maps have been routed and routing numbers have been entered into an Excel spreadsheet
for importing into IAS Total: (11,753). Planned units to date: (11,757).
Public Information
All pre list information mailers have been printed and mailed.
Approximately 9100 Residential Data mailers have been delivered to the City of Dover for bulk mailing as of
July 22nd. As of 10/09/09, 707 Data Mailers have been returned by property owners from which 84 incorrect
photos have been identified by property owners.
Press release updating public on the status of the revaluation program to be published in City of Dover’s
Quarterly News Letter within the next several weeks and will appear min the Dover Post in December.
Residential Data Collection: As of 9/25/09; (9,149) first calls had been made.
Planned units to date: (9,200)
Page 193
Total Refusals: 170 6% of Contact
Interior Refusals (Interior Information & Exterior): 1490 51.5% of Contact
Interior Refusals (No Interior Information & Exterior): 58 2% of Contact
Interior Inspections: 1175 40.5% of Contact
Estimated: 759 8% of the time
Vacant Bldg.: (259 unoccupied;13 abandoned) 272 3% of the time
No One at Home: 5224 57% of the time.
Contact: 2892 32% of the time.
Approximately 60 properties that were classed as residential on the 2008 Roll were flagged during residential
data collection as being commercial conversions. Once commercial data collection has been completed these
will have been resolved.
Commercial Data Collection: As of 11/20/09: units to date: 1205*
Planned units to date: (1205)*
Exempt Data Collection: As of 11/6202009: units to date: 425*
Planned units to date: (425)*
Residential Pre-Review: As of 11/20/2009: 9,149 units completed. Planned units to date (9,200)*
Data Entry: As of 11/20/09: 11,758 properties had been entered into the IAS World 2009 file.
Planned units to date: (11,758)*
* Planned units to date reflect numbers extracted from IAS after the 2008-2009 rollover. Apart
from the total number of occurrences of active(current) parcel identifiers, the parcel counts within the individual
categories of Commercial, Exempt and Residential were determined by counting the number of “CLASS”
occurrences; C, E, R, assuming these classifications represented parcels improved with buildings and excluded
vacant land parcels. In the end the actual number of improved parcels will differ from those assumed in the
“units to date” category above since many parcels assumed to be improved turned out to be vacant.
To avoid this confusion in the future, all vacant land parcels have been assigned the classification of
“V”. The distinction between Exempt and non-Exempt is addressed in the Land Use Code; [(LUC). ---
E00 and C00 respectively)].
Income and Expense Request: The Assessor’s Office has mailed Income and Expense forms to all
commercial properties. As of 11/20/09, 775 had been returned. Of the 774, 353 are either owner occupied or
exempt and 422 have supplied income data, of which 390 have been entered into spreadsheets that will be
utilized in developing income models.
Outstanding Issues: Resolution of lot size discrepancies. The lot size for any parcel in IAS is calculated
from the Land record and is displayed in the CALCACRES field of the Parcel record rather than being a fixed
field. There are 2,478 parcels with no land size in the CALCACRES field of IAS that do have land size records
in the Kent Co. property record data base. There are 2,451 parcels with CALCACRES in IAS that differ from
the Kent Co. records by 4% or more. The 4% was chosen as an arbitrary threshold because the Kent Co. land
record apparently rounds lot size. This threshold could be recast at a higher rate subject to the Assessor’s
review.
Additionally there are a number of parcels (473) in IAS that have no lot size nor any match in the Kent Co. GIS
data base. These have been given to the Assessor for resolution. As of 11/6/2009, approximately 1300 lot size
discrepancies have been resolved.
Land valuation will proceed. Any changes made to lot sizes in IAS by the Assessor’s office will be
communicated to Tyler so as to track changes to value.
Page 194
VALUATION
Land Formatting:
All land1 will be classified as either Primary or Residual according to whether it
meets the zoning threshold. All land less than 1 acres will be formatted in square feet otherwise in
acres.
1. That is the majority of land. Other land types to be employed; Secondary; Waterfront; Waste.
Residential land models have been tested and loaded into IAS. Residential cost factors have been
been updated and tested. Land and residential building cost have been applied to the residential
data- base and tested against the sales data- base2.
MRA(Multiple Regression)
MRA modeling has been completed and applied to the residential subject data-base. The MRA
Model was derived from an analysis of sales and plotted back to the sales data-base. The following
ratio statistics summarize the application of both Cost and MRA to the sales data-base.
Median ratio of Market Estimate and Cost
estimate to time adjusted sales price.
Mean ratio of Market estimate and Cost
estimate to time adjusted sales price. MARKET COST
Agg. Total market value of sales divided
by total value of time adjusted sales prices. Median 0.96 0.95
Total cost value of sales divided by total Mean 0.97 0.97
value of time adjusted sales price.
PRD. Price Related Differential. Mean Agg 0.96 0.95
Ratio divided by Agg ratio for both Mkt. PRD 1.016 1.013
and Cost. A measure of assessment pro- COD 6.75 8.19
gressivity or regressivity.
COD. Coefficient of Dispersion. The
average percentage deviation from the
Median ratio.
The statistics enumerated above are all well within the standards established by the IAAO.
Once final review is complete these statistics will be recalculated as there will be changes
resulting from the review.
Final review of residential values will begin the week of November 9, 2009.
Sales Database: Because of market conditions, only sales for 2008 and 2009 (mid Sept.)
will be used as the comparable sales set. It is possible that sales for the year, 2007 could be
added back to the sales base. It’s desirable to have at least 10% of the improved residential
base be sale properties and it is common in mass appraisal practice to use sales from the three
years prior to the valuation date, provided those sales are adjusted for time (market conditions).
The trend analysis done by Genie Flynn demonstrates a gradual decline in sales prices over
the period beginning January, 2007 and ending November, 2009. At issue was the determination
of how abrupt the decline has been over the three year period and public perceptions about that
decline. The evidence shows that there is no risk to accuracy by employing the 2007 sales.
ind
MONTH AVG ASR TREND MONTH SUGG TREND DIFF
Page 195
2009 NOV 0.902 1.00 NOV 1.00 0.00
OCT 0.904 1.00 OCT 0.99 0.01
SEP 0.883 0.98 SEP 0.98 0.00
AUG 0.872 0.97 AUG 0.97 0.00
JUL 0.834 0.93 JUL 0.96 -0.03
JUN 0.853 0.95 JUN 0.95 0.00
MAY 0.794 0.88 MAY 0.95 -0.07
APR 0.829 0.92 APR 0.94 -0.02
MAR 0.837 0.93 MAR 0.94 -0.01
FEB 0.87 0.97 FEB 0.93 0.04
JAN 0.89 0.99 JAN 0.93 0.06
2008 DEC 0.852 0.95 DEC 0.92 0.03
NOV 0.83 0.92 NOV 0.91 0.01
OCT 0.822 0.91 OCT 0.9 0.01
SEP 0.789 0.88 SEP 0.89 -0.01
AUG 0.819 0.91 AUG 0.88 0.03
JUL 0.773 0.86 JUL 0.87 -0.01
JUN 0.776 0.86 JUN 0.86 0.00
MAY 0.769 0.85 MAY 0.85 0.00
APR 0.787 0.87 APR 0.85 0.02
MAR 0.766 0.85 MAR 0.85 0.00
FEB 0.752 0.84 FEB 0.84 0.00
JAN 0.794 0.88 JAN 0.84 0.04
2007 DEC 0.798 0.89 DEC 0.84 0.05
NOV 0.761 0.85 NOV 0.84 0.01
OCT 0.754 0.84 OCT 0.84 0.00
SEP 0.78 0.87 SEP 0.84 0.03
AUG 0.746 0.83 AUG 0.84 -0.01
JUL 0.753 0.84 JUL 0.84 0.00
JUN 0.759 0.84 JUN 0.84 0.00
MAY 0.774 0.86 MAY 0.83 0.03
APR 0.764 0.85 APR 0.83 0.02
MAR 0.728 0.81 MAR 0.82 -0.01
FEB 0.726 0.81 FEB 0.81 0.00
JAN 0.766 0.85 JAN 0.81 0.04
SUGG TREND
1.20
1.00
0.80
0.60
SUGG TREND
Page 196
Residential Final Review: As of 12/18/2009, 9,200* residential properties have been reviewed.
Planned Units to Date: 9200
Commercial/ Exempt Final review: As of 1/29/2010: 1205 properties have been reviewed.
Notice to taxpayers: Residential value notices were mailed 1/29/2010. This mailing was sent “Standard”
which has delayed delivery. The date by which property owners may respond in
order to schedule an informal hearing has been extended to March 1, 2010 from
February 26, 2010.
Commercial/Exempt value notices were delivered to the City’s mailroom Friday A.M.,
February 12, 2010; to be mailed 1st. Class.
Informal Hearings:
Property owners will have the opportunity be meet informally with representatives of
Tyler Technologies, if they have questions concerning their new assessment(s).
The Archeology Museum at the corner of North St. and South Governors will be the
location for the hearings. Hearings are scheduled to begin 2/4/2010.
Scheduled Hearings:
Through 2/27/2010: 115 Residential. Cancelled or no-show: 37
Through 3/1/2010: 96 Commercial. Cancelled or no show: 13
The number of hearings conducted will exceed the number scheduled. Several
commercial property owners with multiple properties have brought value notices
for all their properties to the hearing and on second thought decided to declare
information they deem relevant for some or all of those properties not originally
scheduled.
Action Item
Conduct and resolve Informal Hearings.
Sincerely,
Steve Beccio, Project Supervisor
Page 197
CC:
PMF
EHF
PM
TLP
Page 198
CITY MANAGER’S
MONTHLY REPORT
February 2010
City Manager’s Monthly Report, February 2010
Page 199
Customer Services
1,121 payments were processed online or by telephone in February 2010.
City of Dover property taxes were due August 31, 2009 and as of February 28, 2010 the delinquent prop‐
erty taxes total $398,233.89. Our collection efforts include sending a delinquent statements, making
phone calls, and enforcing the Clean Hands Act. The Planning and Inspections Departments have been
providing assistance in collecting these outstanding debts.
Budget and Program Development
Continued meetings with departments to review Fiscal 2011 CIP projects.
Human Resources
Preparations began for the IUE‐CWA labor contract negotiations.
Information Technology
Initial Cyber Security Planning meeting was held in preparation for the March 31 Greater Dover Area Exer‐
cise.
Set up telephones in the Call Center during the February snow storms.
Reduced expenses by establishing connectivity with a cheaper internet provider at the Power Plant.
Parks, Recreation, & Library
The Library recorded 437 people attending 17 children’s programs.
Twenty teenagers participated in two Young Writer’s Workshops.
A public workshop was held to get public input on the revitalization project at Silver Lake Park. Fourteen,
lake side property owners attended and shared their input. A presentation regarding this workshop was
given during Parks, Recreation and Community Enhancement committee meeting on March 8, 2010.
Public Services
Refined and implemented Snow Removal Plan and Call Center procedures.
Document preparation began for the 2010 Street Program.
Public Utilities
All divisions participated in snow removal efforts.
Electric division had very minimal service interruptions during the snow events.
Water/Wastewater personnel attended the Annual Delaware Rural Water Association Training in Harring‐
ton.
2 City Manager’s Monthly Report, February 2010
Page 200
CITIZEN ACTION CENTER
Aug Sept Oct Nov Dec Jan Feb
2009 2009 2009 2009 2009 2010 2010
Number of Frequently Asked Questions 495 521 304 253 314 249 222
Citizens view answers to some of the most asked questions. Having this information available online it allows citizens to access the
information regardless of the time; day or night.
Total Number of Complaints Registered
200
175
150
125
100
75
50
25
0
Aug‐09 Sep‐09 Oct‐09 Nov‐09 Dec‐09 Ja n‐10 Feb‐10
Aug 09 Sep 09 Oct 09 Nov 09 Dec 09 Jan10 Feb 10
Site Admin/Other 1 2 1 1 3 0 11
Public Utilities 3 3 1 1 1 4 0
Public Services/Public Works 2 1 3 0 1 0 0
Police 1 1 3 2 3 0 2
Planning/Inspections 84 61 38 17 14 24 14
Average Time to Close
Planning and Inspections: Property Code Violations—8.5 days
Police: Community Policing—16.75 days
Site Admin/Other: Account Set Up, Employee Compliment & General Inquires—0.77 days
City Manager’s Monthly Report, February 2010 3
Page 201
CENTRAL SERVICES
Fleet Operations & Maintenance Items on Hand with no Usage over 36 Months
80000 120 1000000
70000
100
Total Work Orders
60000 800000
Total Dollars
80
50000
40000 60 600000
30000
40
20000 400000
20
10000
0 0 200000
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Feb- M ar- Apr- M ay- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb-
09 09 01 09 09 09 09 09 09 09 09 10 10 09 09 09 09 09 09 09 09 09 09 09 10 10
Tot al Dollars Total Work Orders Electric Water General
Work Orders: 108 Electric: $375,824.70
Fleet Maintenance: $56.95(excludes Melvin’s Sunoco) Water: $ 25,603.36
Fuel: $41,961.63 General: $ 44,839.64
Stock Purchases by Fund Contingency & Warehouse Stock
$500,000 $4,500,000 2,700
2,600
$400,000 $4,000,000 2,500
Total Line Items
2,400
$300,000 $3,500,000 2,300
Total Dollars
2,200
$3,000,000 2,100
$200,000
2,000
$2,500,000 1,900
$100,000
1,800
$2,000,000 1,700
$0 Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Jan Feb
Feb- M ar- Apr- M ay- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- 09 09 09 09 09 09 09 09 09 09 09 10 10
09 09 09 09 09 09 09 09 09 09 09 10 10
Tot al Dollar Value Tot al Line Items
Electric Wat er General
Electric: $ 7,938.73 Total Dollar Value: $3,5439,019.71
Water: $ 3,406.67 Total Line Items: 1,935
General: $ 6,404.02
Major Program Updates
MEASURE FEBRUARY 2010 FEBRUARY 2009 DIFFERENCE
Issue Effectiveness (>90%)
How often the warehouse has what cus‐
100% 99.7% .22%
tomers need when it’s needed.
[issues / (issues + back orders)] * 100
Turn Over Rate (4‐5 per yr.)
Indicates that the material stocked is the 1 every 29.43 years 1 every 16.61 years 12.82 years
material being used.
Bids for non‐inventory items converted to
6 of 6 Bids 31 of 36 Bids
purchase orders within timeframe 14%
100% 86%
(Quantity and Percentage)
Sealed bids prepared, received & distrib‐
25 of 25 Bids 43 of 46 Bids
uted within 7 working days of receipt 6.5%
100% 93.5%
(Quantity and Percentage)
Scheduled Preventative Maintenance
9 of 32 appointments kept 35 of 39 appointments kept
appointments being kept. ‐61.74%
28% 89.7%
(Quantity and Percentage)
Mail receiving lowest discounted rate 31,432 pieces 30,176 pieces
‐0.34%
(Quantity and Percentage) 97.1% 97.4%
Routine work orders completed within 5 32 work orders completed 25 work orders completed
1.98%
days (Quantity and Percentage) 91.4% 92.6%
Emergency work orders completed within 6 work order completed 2 work order completed
‐
2 days (Quantity and Percentage) 100% 100%
4 City Manager’s Monthly Report, February 2010
Page 202
CUSTOMER SERVICES
WORK ORDERS PROCESSED EXTENSIONS OF CREDIT
3,500
738
800 708 698
657
3,000 700 621 613
557 556 568
600 542
2,500
468
1,803 1,875 1,848 1,841
1,784 1,737
500
1,581 1,516 1,526 356
1,487
352
2,000
1,382 1,355 1,399 400
1,500
300
1,000 200
100
500
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2010 2010
2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2010 2010
CUTS FOR NON PAYMENT
CUSTOMER PAYMENT USAGE
108,994 109,282
$1,800,000
120,000 $1,600,000
100,000 $1,400,000 $1,229,532
$1,137,331
80,000 $1,200,000
49,072
42,699
60,000 $1,000,000
22,812 20,614
$800,000
15,775 16,027
40,000
11,151 $600,000
20,000
85 $400,000
0 $161,151 $184,230
$200,000
Drive‐Thru Over the Mail, Drop Credit Cards Bank Drafts
Window Counter Box $‐
2010 YTD 2009 YTD February 2010 February 2009 FYTD10 FYTD09
FY 2010 FY 2009
Major Program Updates Feb 2010 Feb 2009 Difference
Year‐to‐Date Year‐to‐Date
Number of Customers Served 22,473 21,881 592 191,432 209,613
Final Bills 512 591 (79) 4,813 5,796
Estimated Bills 165 148 17 1,147 1,271
Penalties Posted $ 17,731 $ 1,856 $ 15,875 $ 142,487 $ 141,970
Extensions of Credit ‐ Amount Extended $ 157,538 $ 108,569 $ 48,969 $ 1,109,203 $ 1,277,559
Balance Transfers $ 3,377 $ 66,334 $ (62,958) $ 32,030 $ 119,277
Utility Collections $ 18,687 $ 14,810 $ 3,877 $ 172,200 $ 407,684
Special Assessments $ 110 $ 110 $ ‐ $ 32,666 $ 2,423
Miscellaneous Billings $ 26,408 $ 15,175 $ 11,233 $ 811,279 $ 465,331
CNP through Disconnect Collars ‐ 21 (21) 98 228
Court Cases ‐ ‐ ‐ ‐ ‐
Tamperings 2 3 (1) 25 33
Taxes Levied $ ‐ $ 26,096 $ (26,096) $ 9,821,008 $ 9,650,181
Billing Adjustments $ 774 $ 138 $ 636 $ 138 $ 138
Total Taxes Collected $ 63,618 $ 40,176 $ 23,443 $ 9,379,880 $ 9,016,293
Taxes Outstanding $ 398,234 $ 419,456 $ (21,222) $ 419,456 $ 419,456
Payments in Lieu $ 1,500 $ 1,500 $ ‐ $ 12,000 $ 56,802
Billing Accuracy (on schedule billings) 99.0% 99.0% ‐ 99.5% 99.1%
Bills Published on Schedule 99.9% 99.9% ‐ 99.9% 99.9%
Meters Read on Schedule 99.9% 99.9% ‐ 99.9% 99.9%
Customer Satisfaction Rating 99.7% 99.7% ‐ 99.8% 99.7%
Deliquent Accounts Collected 99.7% 99.7% ‐ 99.7% 99.7%
City Manager’s Monthly Report, February 2010 5
Page 203
HUMAN RESOURCES
Customer Service Contacts Payroll Hours
300 7,000
250
6,000
5,000
200
4,000
150
3,000
100
2,000
50
1,000
0 0
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Jan Feb
09 09 09 09 09 09 09 09 09 09 09 10 10
09 09 09 09 09 09 09 09 09 09 09 10 10
Citizens Assisted 20 25 68 75 75 60 50 41 73 54 83 95 83
Employees Assisted 37 70 97 150 80 70 65 59 84 91 62 74 67 Overtime 1,556 1,412 1,602 1,064 1,375 1,977 1,196 1,727 1,145 1,549 3,543 1,948 5,097
Applications Processed 35 0 2 0 0 0 125 1 15 0 105 81 6 Sick 2,173 3,32 1,969 2,115 2,06 1,776 1,470 1,584 1,473 1,241 1,763 1,656 1,220
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Category Total
09 09 09 09 09 09 09 09 09 09 09 10 10
*
Caucasian 344 343 342 342 332 331 327 324 325 323 322 320 320 N/A
*
Minorities 60 59 59 61 63 62 62 60 60 61 61 61 61 N/A
Hired 1 ‐ ‐ 2 ‐ ‐ ‐ 1 2 1 1 1 ‐ 9
Terminated/Resigned/
3 2 1 ‐ 1 2 4 6 1 2 2 4 ‐ 28
Retired
**
Promoted ‐ ‐ ‐ ‐ 1 1 ‐ 1 ‐ 1 ‐ 1 2 7
Jobs Posted 1 ‐ 1 ‐ ‐ ‐ 1 1 1 ‐ 3 1 3 12
Workers Comp. Injuries 3 6 3 2 6 4 3 3 1 1 ‐ 4 2 38
Workers Comp. Hours 64 17 126 350 194 323 417 283 103 25 26 23 50 2,001
Insurance Claims 6 2 6 7 4 5 9 1 2 5 2 1 10 60
*A review has been completed to ensure the accuracy of the Caucasian and Minority employees. The figures for June 2009 reflect the revised and updated
numbers. Workers’ Comp. hours may not be the result of injuries that occurred during the current month. ** Employee was promoted in July, however not
indicated on report.
Full‐time Employees: 365
Part‐time Employees: 16 (4 Pitts Center, 1 Recreation, 11 Library)
Numbers do not reflect, temporary, seasonal, relief fire dispatchers, committee or council members.
Jobs Posted: Fire Chief’s Assistant, Admin. Assistant (Grant Funded, Part‐Time, Community Development), Motor
Equipment Operator (Lateral Transfer)
Employee (s) Hired: Police Officer
Promotions: T&D Coordinator (Electric) , and Motor Equipment Operator III (Sanitation)
Unfilled/Open Positions Jul Aug Sep Oct Nov Dec Jan Feb
By Department 09 09 09 09 09 09 10 10
Public Utilities 5 5 9 8 8 8 9 10
Public Services ‐ ‐ ‐ 1 1 2 43 3
Police 1 1 3 3 3 3 4 4
All Other Departments 6 8 8 8 9 9 10 10
Totals 12 14 20 20 21 22 27 26 27
January 2010 Public Services was overstated by 1.
Individuals on terminal leave (not included in Chart) : Library‐1;
Public Utilities: Utility Maintenance Mechanic I, promoted
6 City Manager’s Monthly Report, February 2010
Page 204
HUMAN RESOURCES
continued
Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan Feb
Bonus Program Category Total
09 09 09 09 09 09 09 09 09 09 09 10 10
Stop Program‐Sensibly Taking
8 11 12 13 8 17 4 20 57 ‐ 13 20 ‐ 183
Off Pounds(weigh‐ins)
Pays‐Program Awarding Your
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Suggestions (submissions)
On the Case‐Cost And Savings
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Excavation (submissions)
Caught Doing it Right‐
Promotes employees
1 ‐ 6 ‐ ‐ 7 ‐ 1 2 2 2 1 ‐ 22
productivity & creativity
(submissions)
Breathe Program‐Rewards for
ending tobacco use ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 ‐ ‐ 2 1 ‐ 4
(submissions)
Ducs in a Row‐Doing Useful
Community Service ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
(submissions)
Workers Comp Injuries
7
6
5
4
3
2
1
0
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
09 09 09 09 09 09 09 09 09 09 09 10 10
Public Utilit ies Public Services Police All Other Dept s
Public Utilities: 0 Public Services: 1 Police: 1 All Other Depts.: 0
Workers Comp Hours
450
400
350
300
250
200
150
100
50
0
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
09 09 09 09 09 09 09 09 09 09 09 10 10
Public Ut ilities Public Services Police All Ot her Depts
Public Utilities: 0 Public Services: 26 Police: 24 All Other Depts.: 0
City Manager’s Monthly Report, February 2010 7
Page 205
INFORMATION TECHNOLOGY
Service Requests Resolved Citizen Action Center
150
118 123
250 226 118 123
212 216 211 125 102
203 102
190
200 178 100
170
81
162 161
81 73
153 75 57
73
132
150 53 57 53
123 51 53
40
50 36
36 41 36
36
34 32
34 32
100 25
0
50 Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb-
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐ 09 09 09 09 09 09 09 09 09 09 09 10 10
09 09 09 09 09 09 09 09 09 09 09 10 10
New Issues Customers w/ New Issues
Supported PCs CityofDover.com Visitors
500 100,000
77,138
450
400
65,415 66,744 65,764
350 345 348 352 342 342 341
333 75,000
61,049
Pages Viewed
60,065
350 318
294 295 295 295
53,304 52,462
50,109
300
47,278 45,054
250
50,000 44,905
200
150
100 *
25,000
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐ ‐Feb ‐Mar ‐Apr ‐May ‐Jun ‐Jul ‐Aug ‐Sep ‐Oct ‐Nov ‐Dec ‐Jan ‐Feb
09 09 09 09 09 09 09 09 09 09 09 10 10 09 09 09 09 09 09 09 09 09 09 09 10 10
*Moved the site from Linux to larger Windows resource. Unable to obtain stat for
July 2009.
Same
Current
Performance Indicators Last Month Month
Month
Last Year
iSeries Availability 100% 100% 100%
Server Availability 100% 100% 100%
Programming Requests
12 21 14
Completed
AS/400 Connections
39% 37% 35%
(concurrent/authorized users)
PCs Supported 341 342 294
Scheduled PCs Replaced ‐ ‐ ‐
Servers Supported 16 16 16
People Trained 7 18 17
Availability Statistics based on 7:00 AM until 5:00 PM Monday—Friday
8 City Manager’s Monthly Report, February 2010
Page 206
PARKS, RECREATION & LIBRARY
Library
Adult Services Children Services
3500 1200
3000
1000
2500
800
2000
600
1500
400
1000
500 200
0 0
Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb- Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb-
09 09 09 09 09 09 09 09 09 09 09 10 10 09 09 09 09 09 09 09 09 09 09 09 10 10
Reference Reader's A dviso ry Outreach Electro nic A ssistance Reference Reader's A dviso ry Outreach Electro nic A ssistance
Reference: 58 Reader’s Advisory: 13 Reference: 53 Reader’s Advisory: 24
Outreach: 708 Electronic Assistance: 101 Outreach: 15 Electronic Assistance: 89
CIRCULATION FEBRUARY 10 FYTD 10 FEBRUARY 09 FYTD 09
Dover residents 13,240 124,200 16,376 137,773
Kent residents* 13,741 120,536 16,372 135,435
Non‐county residents 1,295 9,828 1,206 10,628
REGISTRATIONS
Dover residents 168 1,837 176 2,255
Kent residents* 93 1,117 136 1,173
Non‐county residents 7 132 18 116
OTHER
Visiting Patrons 27,498 257,913 29,271 264,625
Meeting Room Usage 360 2,040 140 1,260
Photocopier Usage 1,682 12,879 1,145 9,907
Dial‐A‐Story 1,118 11,633 1,638 12,068
Computer Usage 3,409 37,683 4,450 39,055
Holds (Total) 3,592 42,468 5,540 40,622
*Breakout of Kent County Residential Statistics
Circulation Registrations
Harrington: 104 Harrington: 0
Smyrna: 778 Smyrna: 5
Milford: 98 Milford: 0
Outside City Limits: 12,761 Outside City Limits: 88
Total Registered Users: (Card Holders)
City: 15,288 County: 12,993 New Castle & Sussex Counties: 844
Other: 5,084
Other Points of Interest:
Interlibrary: 2,143 items loaned out Technical services: 1,379 items added
2,422 items borrowed 461 items deleted
Volunteers: 21.25 hours of service completed
City Manager’s Monthly Report, February 2010 9
Page 207
Parks and Recreation
Recreation Revenue Recreation Revenue Breakdown
$30,000
$ 25,000 $25,000
$20,000
$ 20,000
$15,000
$ 15,000
$10,000
$ 10,000
$5,000
$ 5,000 $0
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
$0 09 09 09 09 09 09 09 09 09 09 09 10 10
Jan‐ Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐09 Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
09 09 09 09 09 09 09 09 09 09 09 10 10 General Rental Payments Sport s Leagues Trips
General: $725 Rental Payments: $1,616 Sports: $869
Leagues: $1,270 Trips: $473
RENTALS FEBRUARY 10 FYTD 10 FEBRUARY 09 FYTD 09
Baseball/Softball Field Rentals* ‐ 108 ‐ 158
Dover Park Pavilions (2) ‐ 18 ‐ 24
Multipurpose/Field Hockey Field Rentals* ‐ 44 ‐ 28
Recreation Center – Dover Park 11 88 13 94
Silver Lake Pavilions (2) / Schutte (1) ‐ 31 1 26
Soccer Field Rentals* ‐ 10 ‐ 14
Stage – Mobile Platform ‐ 16 1 14
*These numbers reflect groups that utilized our facilities during February.
PROGRAM ATTENDANCE* FEBRUARY 10 FYTD 10 FEBRUARY 09 FYTD 09
No classes ended at Dover Park for February ‘10. N/A 10 N/A 15
*These numbers reflect activities that ended/ took place in February at Dover Park. (Not included on the JWP report).
Pitts Center ‐ Total Program Attendence
FREE Open Gym Registration Cards* ‐ through 2/28/2010
Total Cards Issued: 3,235
12,043
15,000 City Residents: 1,494 ‐ (46%)
Non‐City Residents: 1,741 ‐ (54%)
‐ Kent County: 1,380 ‐ (43%)
8,000
7,374
10,000 ‐ Sussex County: 113 ‐ (4%)
# of people
6,082 ‐ New Castle County: 79‐ (2%)
4,352 3,975
‐ Out of State: 169 ‐ (5%)
3,335 2,966 2,761 2,492 2,431
5,000
1,175 1,315 *The cards permit entrance to the facility during sched‐
uled Public Gym Periods at no charge.
0
Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb-
09 09 09 09 09 09 09 09 09 09 09 10 10
10 City Manager’s Monthly Report, February 2010
Page 208
PUBLIC SERVICES
Administration
Administrative review and inspection services continued on all residential and commercial developments.
The following residential subdivisions are in various phases of construction:
Oak Shadows Emerald Pointe Lexington Glenn
Village of Westover (Phase VI) Seskinore Nottingham Meadows
Stoney Creek (Phase II) Clearview Meadows Village of Cannon Mill
Somerset Park Patriot Village Eden Hill (Residential)
Farthing Woods
Sanitation
Monthly Total Refuse (Tons) Sanitation Hours
1,118 1,078
1,044 1,032 1,041
1200
1,200 1,012 987
893 928 1000 887
1,000 833 815 777
777
800
800 636 632
531
600 474 442
600 450
412 410 426 419
376 388
319 318
400 224 233 400 269
167
200 200
21.0 78
2 3
‐ 0
Feb Mar April May June July Aug Sept Oct Nov Dec Jan Feb Bulk Collection Mechanized Hand Trash Container Electronic Goods
Collection Collection Repair/Delivery Pickup
09 09 09 09 09 09 09 09 09 09 09 10 10
Bulk Automated February 10 February 09
FEBRUARY 10 FYTD10 FEBRUARY 09 FYTD 09
Tons Dry Waste Collected 43.91 1,004.44 71.13 1,052.20
Tipping Fee Savings Realized $856.25 $19,586.59 $1,387.04 $20,517.90
Trips to DSWA Sandtown Landfill 163 1,840 220 2,073
Total Tonnage to DSWA 802.08 9,983.82 1,000.79 10,589.42
90‐Gallon Containers Delivered 11 229 38 274
300‐Gallon Containers Delivered 1 24 5 61
Total Man Hours Containers Delivered 21 294 78 477
CURBSIDE TOTAL # OF HOUSEHOLDS
WEIGHT/LBS. % PICKED UP
RECYCLING STATS HOUSEHOLDS PICKED UP
January 2010* 15,420 10,213 247,340 66%
*Numbers are reported one month behind
City Manager’s Monthly Report, February 2010 11
Page 209
FEBRUARY 10 FYTD10 FEBRUARY 09 FYTD 09
Signed Installed 10 144 14 265
Signs Repaired 6 104 18 124
Curbs Painted Yellow (feet) ‐ 240 ‐ 2,552
New Post Installed 3 111 6 39
Storm Catch Basins Cleaned ‐ 124 1,382 1,454
Storm Catch Basin Cleaning (Hrs.) ‐ 171 ‐ 164
Hot Mix Patching (Tons) ‐ 651 ‐ 283
Cold Mix Patching Hrs.) 48 252 28 221
Concrete Work (Hrs) ‐ 150 ‐ 216
Concrete Patching (Cubic Yards) ‐ 12 1 26
Street and Alley Maintenance (Hrs) 120 1,050 152 1,120
Street Sweeping (Miles) 126 6,540 1,344 7,936
Street Sweeping (Cubic Yards) 225 1,293 252 1,476
GROUNDS
Arborist Crew FEBRUARY 10 FEBRUARY 09
Trees Trimmed 79 442
Trees Removed 12 196
Cleared back several alleys for the Sanitation Division.
Beautification Crew
– Began sowing seeds of annuals/perennials in the Greenhouse. Started potting up the seedlings.
– Repaired annual beds damaged by snow removal equipment.
– Assisted with snow removal, alley clearance, and chipping brush in the parks.
Grounds Maintenance/Mowing Crews
– Extensive snow/ice removal from three snow events. Used walk‐behind snow blowers on the flat roof of the
Warehouse.
– Assisted Arborist crew with dead tree removals in Dover Park and storm damaged trees in the parks.
Special Projects Crew
– Repaired a number of yards from snow plow damage.
– Repaired the area on the Green and Legislative Mall damaged by the poles for the peace sign and the ball drop
pole from First Night.
– Assisted with snow removal, clearing back alleys and dead trees in the parks.
12 City Manager’s Monthly Report, February 2010
Page 210
ECONOMIC DEVELOPEMENT
UNEMPLOYMENT RATES DEC 09 JAN 10 FEB 10
City of Dover 8.8% 9.0% PENDING
National & State averages (US‐9.7% & State‐9.0%)
Source: State of Delaware Department of Labor
Number of contacts made with small businesses and with out‐of‐town companies interested in locating to Dover.
TYPE YTD Contacts Made
Small Businesses 9
Out‐of‐town Companies 7
A Presentation regarding the Dover Sun Park, and partnership opportunities, was given at Delaware State Uni‐
versity. A subsequent meeting was held with the Interim Dean of the College of Mathematics, Natural Sciences
and Technology and the Chair of the Technology Department to provide more details.
Economic Development is taking the lead in exploring the possibilities of a public/private partnership to erect a
building at the Dover Transit Center. A small sub‐committee has be established to assist with this project. Meet‐
ings have been held with two contractors and possible future tenants.
Meeting was held with the local representative of Evergreen LED, and local business men, at the Enterprise
Park to discuss the future fit‐out for a distribution center.
DOWNTOWN DOVER PARTNERSHIP
The Design Committee awarded a grant to the Greater Dover Committee for exterior painting at the Greater
Dover Foundation Community Building. This is the fifth award given under the revamped Façade Improve‐
ment Program. The committee also finalized arrangements for a Downtown Dover Clean Up Day to be held
in March.
An application has been prepared and submitted for an Arts grant to supplement programming for First Fri‐
days.
Staff participated as panelists at the Annual Entrepreneurship and Small Business Conference at Delaware
Technical and Community College. Staff also served as panelists at the USDA sponsored Jobs and Economic
Growth Forum at Dover Downs.
Remodeling at 680 Forest Street has been completed and Vee’s Hair Braiding has been successfully relocated
to 680B Forest Street. The Dover Interfaith Housing Coalition can now proceed with renovations.
Orientation was completed for the CDBG funded Youth Employment Program, being administered by the
Dover Housing Authority. Staff attended the Meet & Greet with participating students and employers.
City Manager’s Monthly Report, February 2010 13
Page 211
LIFE SAFETY
Inspections FEBRUARY 10 FYTD10
Fire and Safety Inspections 40 206
Fire Code Inspections 47 471
Certificate of Occupancy 6 65
Office 126 856
Meetings 35 308
Plan Review 85 454
Training 14 376
Fire Education ‐ 42
Fire Investigations 84 284
Accidental $11,800 $353,800
Incendiary $1,000 $134,300
Undetermined $14,000 $53,000
PERMITTING AND LICENSING
Permits Issued FEBRUARY 10 FYTD10 FEBRUARY 09 FYTD 09
Building Addition/Renovation Permits 17 310 22 343
Building Permits 10 81 2 76
Demolition Permits 5 32 4 20
Fence Permits ‐ 52 ‐ 75
Fire Prevention Permits 3 51 9 68
Mechanical Permits 17 279 15 366
Plumbing Permits 22 338 38 466
Sign Permits 18 183 21 152
Swimming Pool Permits ‐ 1 1 10
Business Licenses 17 1,192 20 1,662
Merchant Licenses 4 282 2 330
Contractor Licenses 14 736 24 925
Lodging House Licenses 1 41 10 47
Mobile Homes 8 719 3 367
Public Occupancy 34 284 29 286
Rental Dwelling 588 2,341 648 2,441
BUILDING INSPECTIONS
Permits Issued FEBRUARY 10 FYTD10 FEBRUARY 09 FYTD 09
Building 247 2,922 448 2,468
Plumbing/Mechanical 92 1,900 372 1,826
Certificate of Occupancy 6 170 32 200
14 City Manager’s Monthly Report, February 2010
Page 212
PUBLIC UTILITIES
ELECTRIC
System Peak Total System Load
200.0 100,000
90,000 78,500
161.1
71,603
147.2 66,117
80,000
63,350 63,373
133.8 57,892 58,013 59,833
127.6 55,311 56,420 56,857
150.0 70,000
122.0 53,597 54,029
109.4 110.2
60,000
106.0 103.7 107.0 104.0
99.1 98.2 50,000
100.0 40,000
30,000
20,000
50.0 10,000
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
09 09 09 09 09 09 09 09 09 09 09 10 10 09 09 09 09 09 09 09 09 09 09 09 10 10
Outages Customers of Gained/Lost
20 25,000 35 32
20,000 30
15
25 23
Customers
15,000
Outages
10 20 17 17
10,000 15 15 15
15
5
11
5,000 10 7 7
4 5
0 0 5 3
Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan Feb 0
09 09 09 09 09 09 09 09 09 09 09 10 10
Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan Feb
Outages Customers 09 09 09 09 09 09 09 09 09 09 09 10 10
Outages: 9 Customers: 3,845
ELECTRIC OUTAGE REPORT
# OF
OUTAGE # DATE TIME OUT TIME IN LOCATION DEVICE ACTION
CUST
1 02/02 02:35 PM 02:58 AM 21 Lotus Street Blown Fuse 152 Replaced Fuse
2 02/02 04:31 PM 05:23 PM 617 E. Division St Blown Fuse 10 Replaced Fuse
3 02/06 01:56 AM 04:48 AM 39 Huntley Circle Blown Fuse 20 Replaced Fuse
4 02/07 11:50 AM 03:13 PM 116 Greenhill Ave Bad Triplex 1 Replaced
5 02/10 10:25 AM 11:25 AM 449 Pickering Beach Rd Wire Down 347 Repaired
6 02/10 12:11 PM 01:59 PM 635 Crawford Ave Bad Elbow 809 Replaced Elbow
7 02/10 06:05 PM 08:01 PM Horsepond Substation Broken Insulator 2,504 Replaced
8 02/17 06:40 AM 07:40 AM 760 Townsend Blvd Meter Pan Down 1 Repaired
9 02/26 01:50 AM 03:15 am 1080 Silverlake Blvd Blown Fuse 1 Replaced Fuse
City Manager’s Monthly Report, February 2010 15
Page 213
ENGINEERING SERVICES
Completed Projects Active Projects / % Completed Projects in Design / % Completed
Wawa Bay Court Plaza Redesign ‐ 90%
Grandview Mobile Home Park ‐ 80%
Lexington Glenn ‐ 90% Cahne Medical Building ‐ 0%
Clearview Phase 1, 2, 3 ‐ 50% North Street Improvements ‐ 50%
Tall Pines, Dover Kenton Road ‐ 10% Cannon Mill, Phase III ‐ 100%
Chick Filet ‐ 0%
Nottingham Meadows ‐ 50%
Cannon Mill, Phase II ‐ 90% Wawa Court Street ‐ 100%
Stover Professinal Center 508 ‐ 90% Kesselring Farm ‐ 100%
Culligan Complex, Saulsbury Road ‐ 40%
Dove View Development ‐ 30%
Patriot Village ‐ 20% Dover Transit ‐ 0%
State of Delaware I/T ‐ 99% 1600 N. Little Creek Road ‐ 0%
DAFB Feeder ‐ 90% Spence’s Bazzar ‐ 0%
Brentwood ‐ 100%
Eden Hill Residential ‐ 15%
12707‐12206 Tie ‐ 50% Kent General Hospital ‐ 100%
Cross Gates Development ‐ 70% Kent 8 Building ‐ 100%
Walgreens Dupont Highway ‐ 0%
Buchanon Acres ‐ 55%
Silver Lake Blvd Townhouses ‐ 100%
Village of Blue Hen ‐ 10%
Governors Ave Phase II ‐ 10% Governors Lighting Fulton‐State St ‐ 100%
Farthing Woods ‐ 100% Dover Crossroads ‐ 100%
CVS Forrest Street ‐ 100%
Riley Brown ‐ 50%
Garrison Fiber ‐ 0%
Vernon Woods ‐ 40%
The Arbors Senior Center ‐ 0%
Eden Hill Commercial ‐ 10%
L & W Insurance ‐ 100%
Public Library ‐ 0%
Dover Animal Hospital ‐ 100%
McDonalds ‐ 0%
Wyoming Rd Relocation ‐ 0%
Dover Retail ‐ 100%
Fiber Danner to Blue Hen ‐ 5%
TRANSMISSION AND DISTRIBUTION
U nd ergr ou nd W o rk % Co mp let ed O ve rh ead W ork % Com pleted
Cle ar view M ea do w s On go in g Ove rh ea d M a in ten an ce On go in g
Le xin gto n G len n On go in g M ain te na n ce o f City lig htin g On go in g
No ttin g ha m M ea d ow s On go in g
Ca pito l Pa rk U p gra d e to 85 %
Un d er gro u n d
Ses kin ore D e velo p me n t 95 %
Ridg ley Stree t Stora ge 60 %
Sto ver P ro fe ss io na l Cen te r 90 %
Ke nt Acre s 99 %
16 City Manager’s Monthly Report, February 2010
Page 214
MAJOR PROGRAM
FEB 10 FEB 09 DIFFERENCE FY10 YTD FY09 YTD
UPDATES
Tree Trimming 113 337 224 1424 1728
5‐Yr Pole Testing &
Program Not Active
Repair Program
Annual Infra‐Red
Completed ‐ ‐ ‐ ‐
Testing
Annual Substation Oil
Completed ‐ ‐ ‐ ‐
Testing
Track the amount of
spills, clean‐ups, equip.
2 ‐ 2 17 20
sales, & environmental
disposals.
New Professional Work
Confined Space
Practices & Procedures; ‐ ‐ ‐ ‐
Training
Implemented
Universal
safety/security training,
as mandated by federal, ‐ ‐ ‐ ‐ ‐
state, & local
regulations, completed
Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan Feb
METER STATS 09 09 09 09 09 09 09 09 09 09 09 10 10
Radio Read Meter Installations 43 42 38 53 53 122 119 41 50 64 52 62 21
Meters Tested 107 50 59 ‐ ‐ 235 97 159 57 96 170 66 48
Meters Junked 59 ‐ ‐ ‐ ‐ 86 ‐ 102 32 ‐ 74 66 ‐
Meters Removed 22 9 11 10 10 12 8 8 ‐ 13 4 5 3
Meter Changes 24 13 20 24 24 91 77 13 13 36 35 51 22
New Services 8 15 10 16 16 13 23 13 21 15 5 4 2
Services Retired ‐ 2 ‐ 1 1 4 ‐ 5 1 ‐ 5 2 ‐
Switching schedules 10 10 14 12 20 7 3 6 4 11 2 6 6
Work orders 263 263 277 279 526 861 1,047 303 286 1,107 249 242 236
Miss Utility tickets called back 1,713 1,713 2,283 1,947 2,277 2,022 1,724 2,416 2,118 1,370 1,478 1,210 712
Tickets located 1,701 1,911 2,256 2,145 2,206 912 873 1,638 1,388 1,091 739 605 356
SUBSTATION RELAY
Substation Status
Danner Farm Replacing Breaker/Transformer/Relays
City Manager’s Monthly Report, February 2010 17
Page 215
WATER/WASTEWATER
Water Production/Billed Consumption/Flow to Kent County
250,000,000
200,000,000
150,000,000
100,000,000
50,000,000
0
Feb 09 Mar 09 Apr 09 May 09 Jun 09 Jul 09 Aug 09 Sep 09 Oct 09 Nov 09 Dec 09 Jan 10 Feb 10
Total Water Prod. Billed Consumpt. Total Flow to County City Readings
Water Production: 106,432,000 Billed Consumption: 108,479,000
Total Flow to Kent County: * City Readings: 92,929,150
*Billing behind one month
FEBRUARY 10 FEBRUARY 09
Water Production – Daily Average 3,801,143 3,955,464
Fire Hydrants – Flushed ‐ ‐
Fire Hydrants – Tested ‐ ‐
Final Readings 65 561
Cutoffs 6 18
Turn‐on’s 0 15
New Inspections 0 26
Curb Boxes Located 19 59
Curb Boxes Adjusted 0 7
Water Service Lines Repaired 0 2
Water Meters Repaired 30 30
Radio Technology Installations 1 245
New Meters Added 1 10
Total Water Meters in City Distribution System 13,772 13,620
FEBRUARY 10 FEBRUARY 09
L.F. Sewer Lines Flushed 7,192 17,933
Sewer Lines Inspected ‐ ‐
Feet Sewer Mains Videotaped ‐ ‐
Manholes Inspected 34 154
Manholes Cleaned 34 106
18 City Manager’s Monthly Report, February 2010
Page 216
Major Program Updates FEBRUARY 10 FEBRUARY 09 DIFF FY10 YTD FY09 YTD
State and Federal Violations 0 violations 0 violations ‐ ‐ ‐
Water Quality Complaints 8 14 ‐6 369 409
Infrastructure Repairs (Water 32 repairs 42 repairs
1 repairs reported 1 repairs reported ‐
Distribution) reported reported
Infrastructure Repairs 19 repairs 32 repairs
0 repairs reported 2 repairs reported ‐2
(Wastewater Transmission) reported reported
Water System Flushing
0% 0% ‐ 100% 100%
Completed (on schedule)
Percentage of Flow Sent to Kent
County vs. Gallons Billed 151% 136% 15% 124% 99%
(inflow/Infiltration monitoring)
Plan Review Completed within
19 plans 12 plans 7 plans
30 days of Submission 96% 97%
84% 100%
Inspection Response within 48
100% ‐ 100% ‐
hours of Request
City Manager’s Monthly Report, February 2010 19
Page 217
CITY PLANNER’S
MONTHLY REPORT
Public Services Group
P.O. Box 475
Dover, DE 19903
Phone: (302) 736-7010 Fax (302) 736-4217
February 2010
PERSONNEL
Several members of the Planning Staff were involved in the City’s Emergency Management Center and Call
Center operations during the two February snow events.
The 2009 Annual Report for the Department focusing on Planning, Community Development, Code
Enforcement, and Economic Development was prepared and forwarded for review at a March City Council
meeting.
The Planning Office participated in a Staff Retreat held at the Community Services Building on February 19,
2010. Topics covered education and training opportunities, general office operations, and projects and priorities
for the coming year.
EDEN HILL FARM TND
For the Residential District of Eden Hill Farm Traditional Neighborhood Design, no new Building Permits were
filed in February. Following the issuance of review comments on February 19th, Staff is awaiting resubmittal of
the Final Minor Lot Line Adjustment Plan with revisions to Lots 2F, 2G, and 2H of the Residential District. In
February, there was no specific activity associated with the Professional Office, Medical & Financial District.
The Revised Implementation Plan (March 2009) for Neighborhood Commercial District remains in the Check
Print review process working towards Final Plan approval; no plan resubmissions for review were received in
February.
COMPREHENSIVE PLAN IMPLEMENTATION
In February, Planning Staff continued to focus efforts on other short term implementation items identified in the
2008 Comprehensive Plan. Now under the lead of the Economic Development Office, the Garrison Oak
Technical Park is required to file a Preliminary Subdivision Plan for review as the next step. An associated Site
Plan for the development of Dover Sun Park on Lot 15 was granted conditional approval by the Planning
Commission on February 16th. Staff conducted the second working group meeting as part of the process to
update the Environmental Protections within the Zoning Ordinance. The Planning Staff met on February 19th to
develop the annual work plan for the office which will continue to address the Comprehensive Plan
implementation items. Some of the next tasks will focus on development of an Open Space Zone, continued
work on the Historic District Design Guidelines, the development of incentives for annexation, and assisting
with the NPDES Permit.
PERMITTING AND LICENSING REVIEW
The Planning Staff is part of the Building Permit review process. Our activities involving reviewing specific
types of permit applications for compliance with the Zoning Ordinance and for compliance with any conditions
of approval from the Planning Commission, Board of Adjustment, or Historic District Commission.
Page 218
Permits Reviewed January-10 February-10 #
(Issued) Reviewed
(Issued)
YTD
Building 16 15 31
Additions/Renovations
Permits
Building Permits 12 10 22
Demolition Permits 3 5 8
Fence Permits 4 0 4
Sign Permits 12 10 22
Temporary Sign Permits 7 3 10
Swimming Pool Permits 0 0 0
Certificate of Occupancy 6 6 12
Total # Permits 60 49 109
Reviewed (Issued)
*January 2010 amount is number of C/O’s issued.
Planning Staff also reviews new applications for Business Licenses, Rental Dwelling Permits, and Construction
Trailer Placement Permits.
CODE ENFORCEMENT
Case Type # cases # cases % staff % staff
current month YTD initiated initiated YTD
current month
No valid rental permit 3 5 100% 100%
No valid building permit 1 1 100% 100%
Tall grass and weeds 1 1 100% 100%
Unregistered vehicle 6 19 100% 68%
Abandoned vehicle 1 11 100% 64%
Annual Housing 38 156 89% 96%
Inspection
CO Inspection – 1 1 100% 100%
Planning
Property Maintenance – 12 73 92% 79%
Exterior
Electric Termination 4 14 0% 14%
Dover Code of 30 87 73% 69%
Ordinances
Zoning 5 31 100% 87%
Basketball goal 1 1 100% 100%
Total Cases 103 400
Total # of Inspections 207
Page 219
COMMUNITY DEVELOPMENT
FISCAL YEAR 2008
Dover Interfaith Ministry to the Homeless
Demolition has begun to the interior of the building. Site plans have been submitted to the Planning Department for
approval, and renovations are underway.
FISCAL YEAR 2009
Homeowner Rehabilitation Program
Three (3) homes have been completed (49 S. Kirkwood St., 420 Court St., and 720 Carol St.) Bids are expected to go
out in late March and renovations are expected to be underway in early April.
Homeownership Assistance Program (Down Payment Assistance)
Three (3) families have purchased homes and all funding for this project has been expended.
Elizabeth W. Murphey School
The installation of the underground steam pipes is 50% complete in restoring the buildings heating source.
RC & D Emergency Home Repairs
Emergency home repairs have been completed on six (6) homes eliminating health and safety hazards.
Neighborhood Stabilization Program (NSP)
Six properties have been purchased and $822,255 has been expended in NSP funding year to date. Bids for
renovations are expected to go out early March and renovations are expected to begin in early April.
Dover Community Partnership properties: 343 Mimosa Avenue, 907 Woodcrest Drive, and 218 Ann
Avenue
Diamond State Community Land Trust properties: 337 North Governors Avenue, 302 Stonebrook Place
Connections Community Support Program: 1430 S. Hancock Avenue
MEETING REPORTS
Board of Adjustment:
The Board of Adjustment met on February 24, 2010 and took the following actions: The next Board of
Adjustment meeting is scheduled for March 17, 2010.
1. Applicant #V-10-02 - 560 & 600 Bay Road, S.H.E. Holdings, LLC – Moved to table until next
month’s meeting.
Historic District Commission:
The Historic District Commission met on February 18, 2010 and took the actions listed below. The next
regularly scheduled meeting for the Historic District Commission is March 18, 2010. Discussion is ongoing
regarding updating the Historic District Guidelines.
1. HI-10-02 Law Enforcement Officers Memorial – Informational Item Only no action required.
Planning Commission
The Planning Commission met on February 16, 2010 and took the actions listed below. The next scheduled
Planning Commission meeting is scheduled for March 15, 2010.
Page 220
1. S-09-01 South Governors Avenue Animal Hospital at 1002, 1008 South Governors Avenue and
210 and 218 Wyoming Avenue – Moved to approve a one year extension.
2. S-04-20 Seskinore Development – Moved to approve removal of age restriction.
3. Z-09-05 Lands of JNK, LLC at 1051 College Road – Application deferred to next month’s meeting.
4. S-10-01 Dover Sun Park at Lot 15 Garrison Oak Technical Park – Moved to approve w/conditions.
5. S-10-02 Dover Transit Center at 422, 426, 430, 434, 440, 444, 446, and 450 West Water Street –
Moved to approve w/conditions.
6. MI-10-01 Proposed Amendments to the Zoning Ordinance: Race Weekend Parking: - Moved to
forward to City Council approval with amendments.
7. MI-10-02 Proposed Amendments to the Zoning Ordinance: Off-Street Parking Requirements -
Moved to forward to City Council approval.
Submitted by:
Ann Marie Townshend, AICP
Planning & Community Development Director
Page 222
FINAL READING
CITY OF DOVER PROPOSED ORDINANCE #2010-05
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Chapter 2 - Administration, Article VI - Other Post-Employment Benefits Fund, be amended
4 by inserting a new Section 2-505 - Medicare Part B Premium Reimbursements, as follows:
5 Sec. 2-505. Medicare Part B Premium Reimbursements
6 On July 27, 2009, Counci1 approved the recommendation of the Legislative, Finance, and
7 Administration Committee's recommendation not to provide for Medicare Part B premium
8 reimbursement for all non-bargaining employees which applied only to new hires after July 27, 2009.
9 The City currently provides Medicare Part B premium reimbursement for all other non-bargaining
10 employees and the Legislative, Finance, and Administration Committee recommends that this
11 practice be continued provided that it is clearly stated and understood that the decision of Council,
12 if approved by Council, is not vested and can be changed or eliminated at any time.
13 The City of Dover shall continue to provide Medicare Part B premium reimbursements for all
14 non-bargaining employees other than those new hires after July 27, 2009, as it has done in the past,
15 provided that this is not to be considered a vested right and can be changed or eliminated by Council
16 at any time by ordinance or resolution enacted to that effect and, further, that as required by the
17 Charter, Section 3, the fund for payment of the costs of such premium reimbursement shall be
18 continued as in the past.
19 SYNOPSIS
20 The City in the past has provided to all non-bargaining employees Medicare Part B
21 premium reimbursement. On July 27, 2009, Council adopted an ordinance that
22 terminated such premium reimbursement for non-bargaining employees hired on or
23 after July 27, 2009. The effect of this ordinance is to reaffirm the position of the City
24 to continue to provide Medicare Part B premium reimbursement for all
25 non-bargaining employees hired previous to July 27, 2009, with the complete and
26 absolute understanding that this decision of Council does not convey or establish any
27 vested right to non-bargaining employees to receive this premium reimbursement in
28 the future and that such decision of premium reimbursement may be changed or
29 eliminated by Council at any time.
30 ADOPTED: *
31 S:\ORDINANCES\2010\Draft Ordinances\Ordinance 2010-05 Final Rdg.wpd
32 Actions History
33 March 22, 2010 - First Reading at City Council
34 March 8, 2010 - Legislative, Finance, and Administration Committee Recommended Reaffirming the Committee
35 Action of January 25, 2010 for Adoption of Ordinance #2010-05 with the Original Language
36 February 22, 2010 - Referred by City Council Back to Legislative, Finance, and Administration Committee
37 January 25, 2010 - Legislative, Finance, and Administration Committee