CITY OF DOVER HISTORIC DISTRICT COMMISSION
AGENDA
THURSDAY, February 21, 2019 - 3:00 P.M.
City Hall – Conference Room
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES OF MEETING on November 15, 2018
COMMUNICATIONS & REPORTS
1. Summary of Activity
a. Summary of Applications 2017-2018
b. Summary of Architectural Review Certifications for 2018
c. Summary of Architectural Review Certifications for 2019
2. Architectural Review Certification Process
a. Copies of Zoning Ordinance, Article 3 §21 and Article 10 §3
3. Department of Planning & Inspections Update
NEW APPLICATIONS
NEW BUSINESS
1. HI-19-01 Information on Downtown Dover Mural Project – Presentation on Downtown
Mural Project from the Design Committee of the Downtown Dover Partnership. And
including consultation regarding preparation of the South Bradford Street elevation (east
wall) of 109-113 W. Loockerman Street owned by Harrington Center City, LLC.
2. Review of Permits Referred to Commission
3. Certified Local Government (CLG) Program
a. Update on FFY2018 CLG Grant Application
4. Project for Dover’s 2019 Comprehensive Plan
a. Update on Project Activities
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSION.
Agenda Posted: February 12, 2019
Page 2
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
November 15, 2018
The Regular Meeting of the City of Dover Historic District Commission was held on Thursday,
November 15, 2018 at 3:00 PM with Chairman McDaniel presiding. Members present were Mr.
Czerwinski, Mr. Street, Chairman McDaniel and Ms. Mason. Ms. Horsey was absent.
Planning Office Staff members present were Mrs. Melson-Williams, Mr. Julian Swierczek and
Mrs. Savage-Purnell.
APPROVAL OF AGENDA
Mr. Czerwinski moved for approval of the agenda, seconded by Ms. Mason and the motion was
unanimously carried 4-0. Ms. Horsey was absent.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF AUGUST 16, 2018
Mr. Czerwinski moved for approval of the meeting minutes of August 16, 2018, seconded by Mr.
Street and the motion was unanimously carried 4-0. Ms. Horsey was absent.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF SEPTEMBER 20, 2018
Mr. Czerwinski moved for approval of the meeting minutes of September 20, 2018, seconded by
Mr. Street and the motion was unanimously carried 4-0. Ms. Horsey was absent.
COMMUNICATIONS & REPORTS
Summary of Applications for 2017 and 2018
Mrs. Melson-Williams stated that the architect working on the Governor’s Café Kitchen Addition
has been working with the City’s Fire Marshal Office and the Building Inspector to sort out
some things related to what will be their Building Permit submission and the discussion of Building
Codes.
For 2018, the Referral of the Fence Permit at 401 South Governors Avenue was approved based
on the discussion at the meeting, but she does not believe the Permit has been issued. She is not
aware of the status at the current time. It was a potential new business at that location.
Chairman McDaniel asked if it was the Doggy Daycare business. Mrs. Melson-Williams replied
yes.
Summary of Architectural Review Certifications for 2018
Mrs. Melson-Williams stated with the Architectural Review Certifications there were 37 Permits
through October 31, 2018 in the Historic District. There were nine (9) building exterior, six (6)
Roof Permits, five (5) signs/temporary signs, and four (4) fence permits, one (1) demolition and
one (1) siding, and eleven (11) others.
Mrs. Melson-Williams stated that one of the permits appeared before the Historic District
Commission as an update. Most of the permits were for projects that were eligible for Staff review
Page 3
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2018
of the permit or in the cases of about nine (9) of the permits did not require Architectural Review
Certification because they were strictly an interior renovation project or where the project work
was being done is not visible from the public way.
Chairman McDaniel asked where 19 North American Avenue was located. Mrs. Melson-Williams
replied is a half of a duplex in the first block of North of Division Street.
Mr. Czerwinski asked about Permit #18-471 at 25 West Loockerman Street that included
replacement of siding, windows, a new metal roof on pent roof, removal of shutters and removal
of projecting box sign. He was concerned and had a problem that in his opinion Staff was
exceeding their approval limits. This is the second time since the corner building that we have had
a major façade change to a building without it coming in front of the Historic District Commission.
He mentioned that he had a major problem with that. There were a lot of changes made to the
building. He did not have a problem with the building and thinks it looks nice and they did a great
job, but his problem is that a major renovation was done of the façade of the building without it
coming before the Historic District Commission. If you look at the siding it is vinyl and very well
done but is not necessarily accurate to the building. He has a problem with the Staff approval
because these are major renovations to the façade of the building. The Golden Fleece Tavern made
changes that the Historic District Commission was not informed about and now the Dover News
Stand as well as the corner lot of State and Loockerman Street (the changes of the lawyer’s office).
He considers these major events.
Chairman McDaniel asked what triggers a permit to come before the Historic District Commission
verses Staff approval. Mrs. Melson-Williams replied the Zoning Ordinance actually describes in
Article 10 Section 3.2 which deals with the Historic District Commission and Architectural
Review Certification the levels of review. She will make sure the Commission has a copy of the
Zoning Ordinance. She stated that the Code outlines the specific classes of Building Permits that
the City Planner can do regarding the Architectural Review Certification. The next step is the type
of things that require the Historic District Commission and the third level is involving the Planning
Commission.
Chairman McDaniel mentioned that he would like to have a copy. If they wanted to change
anything what would be the steps? Mrs. Melson-Williams replied if the Commission wanted to
change any of the review thresholds that is an Amendment to the Zoning Ordinance. It is an
Ordinance Amendment process where the Commission could put forth suggestions and
amendments and then it would go through review of public hearing by the Planning Commission
and City Council.
Chairman McDaniel mentioned that he would like to know more. He would like to see a copy of
the Ordinance as previously mentioned and once they have had a chance to review the Ordinance
then the Commission can have a discussion. Mrs. Melson-Williams mentioned that she will give
copies to the members before the next meeting. She mentioned that Ordinance can also be accessed
on-line.
There was a brief discussion of the Ordinance and what permits should come before the Historic
District Commission and which Permits should be approved by Staff as discussed in previous
2
Page 4
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2018
meetings. There were on-going concerns regarding projects having major changes in the Historic
District that did not come before the Commission for any input.
Department of Planning & Inspections Update
Mrs. Melson-Williams stated that Staff have been working on the Comprehensive Plan and will
discuss this later in the meeting. She stated that overall in the Department there is a vacancy in the
Code Enforcement Division, but a new person will be starting shortly. However, one of our front
office staff, Courtney Kenton, took on a new position close to her field with Child Care Licensing
with the State of Delaware. Currently, the Office Assistant II position is posted.
NEW BUSINESS
Review of Permits Referred to Commission.
Mrs. Melson-Williams stated that there was no review of Permits referred to Commission. She
stated that there is a Permit in for review for 316 South Governors Avenue, the Old Brick Church.
It had a roof project that was already underway. There were some repointing and HVAC
improvements, repairs, and replacements. She stated that she just received a Permit for a project
at the Murphey School, but it was nothing that needed to be referred to the Commission.
Mr. McDaniel commented that the roof looks nice.
Annual Meeting Historic District Commission
Election of Chairman and Vice Chairman
Mrs. Melson-Williams briefly discussed the By-Laws for the Historic District Commission. Mr.
McDaniel became Chairman of the Historic District Commission in August 2016 and the Vice-
Chairman has the same 6-year term limit. Ms. Horsey has served for 3 years as the Vice-
Chairman.
Mr. McDaniel mentioned that he and Ms. Horsey would be willing to run again; however, if
anyone else would like to take one of those positions that would be fine.
Mr. Czerwinski moved to reelect by acclamation Mr. McDaniel as Chairman for the Historic
District Commission. The motion was seconded by Mr. Street and unanimously carried 4-0.
Mr. Czerwinski moved to reelect by acclamation Ms. Horsey as Vice Chairman for the Historic
District Commission. The motion was seconded by Mr. Street and unanimously carried 4-0.
Meeting & Deadline Draft Schedule for 2019
Mrs. Melson-Williams stated that the meeting date will remain as the third (3rd) Thursday of each
month at 3:00pm. The deadline date to file an application has to be at least 30 days prior to the
meeting date. The Meeting and Deadline Schedule for 2019 was provided to all members. The By-
laws state that the Historic District Commission meeting must meet quarterly.
3
Page 5
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2018
Mr. McDaniel asked if the Historic District Commission had to meet quarterly. He questioned if it
was necessary to meet quarterly if there were no applications. Mrs. Melson-Williams replied yes, the
Historic District Commission is required to meet quarterly. The Commission agenda must be set ten
days prior to your meeting date. If there is any sense that we are going to have a Permit that needs to
be referred to the Commission or anticipate one coming in, they will probably post the agenda as a
meeting.
Mr. McDaniel mentioned that he believes in quick turnaround and being available to the applicants.
Mr. Czerwinski asked about the changing of the meeting date. Mrs. Melson-Williams replied that
it has not been looked at extensively. There are opportunities in the next calendar year where the
Historic District Commission meeting date will fall before the Planning Commission. It is possible
that it may be looked at through the Comprehensive Plan on how the meeting is structured.
Mr. McDaniel asked when the Planning Commission met. Mrs. Melson-Williams replied the third
Monday of each month. The By-Laws does allow for Special Meetings to be called, but there are
limitations on actions that can be taken due to the requirements of public notice involvement.
Ms. Mason asked if a member should let Staff know if they do not plan to attend a meeting. Mrs.
Melson-Williams replied yes, if we have an application, we want to make sure there is a quorum.
Ms. Mason mentioned that she will not be able to attend the meeting on December 20, 2018.
Certified Local Government (CLG) Program
Update on Submission of FFY2018 CLG Grant Application
Mrs. Melson-Williams stated that the grant application is related to preparation of the Historic
Preservation Chapter of the Comprehensive Plan. Staff continues to work on it, but we still do
not have a Grant Agreement in hand. With the CLG Program, the grant typically runs from July
through June.
Project for Dover’s 2019 Comprehensive Plan
a) Update on Project Activities
b) Update on Working Group Meeting for “Partners in Preservation: Planning for the
Future” - Delaware’s Historic Preservation Plan 2018-2022
c) Review of Preliminary Draft of Goals and Recommendations
d) Continued Discussion of Historic Preservation Chapter
Update on Project Activities
Mrs. Melson-Williams stated that Staff gave an update to the City Council Committee of the
Whole last night. In September, City Staff had the opportunity to present to a class at Wesley
College about the Comprehensive Plan and do some interaction with the college students and
others.
Mr. McDaniel asked if Staff thought they received some meaningful comments from Wesley
College. Mrs. Melson-Williams replied yes, they mentioned an Internet Café (as an idea). Mrs.
Melson-Williams felt the Café would have a captive audience.
4
Page 6
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2018
Mrs. Melson-Williams mentioned that Staff have been constantly meeting with various City
Departments and State Agencies to gather information about particular topic areas. Staff have
sent letters and begun conversations with our adjacent municipalities part of the
intergovernmental coordination requirement. Staff have meet with the Town of Cheswold, and
Town of Little Creek. There are also ongoing conversations with the Town of Camden and Kent
County. Staff has not heard from the Town of Wyoming.
Mrs. Melson-Williams mentioned that the thing of note specifically is a copy of the Preliminary
Draft Goals and Recommendations for the Comprehensive Plan have been released. They are
doing a Staff review because each chapter have been written by someone on our Staff.
Update on Working Group Meeting for “Partners in Preservation: Planning for the Future” -
Delaware’s Historic Preservation Plan 2018-2022
Mrs. Melson-Williams mentioned that since the last meeting she participated in a Working
Group Meeting for “Partners in Preservation: Planning for the Future” - Delaware’s Historic
Preservation Plan. They convened a variety group of individuals that are somehow tied to
Historic Preservation. They looked at implementing the State’s Historic Preservation Plan.
Copies of that document were given to members of the Historic District Commission.
Review of Preliminary Draft of Goals and Recommendations
Mrs. Melson-Williams stated that included in the packet were the goals. The document is posted
on the City’s website. She asked if there were any questions. If members had not reviewed the
document, she asked that they review the document for any questions or discussion. There are
also two map series that have been issued. The maps are related to Land Development Plan and
Annexation areas.
Review of Preliminary Draft of Goals and Recommendations
Continued Discussion of Historic Preservation Chapter
Mr. Czerwinski stated that he reviewed the Historic Preservation section and he thought it was
very well written. He did not have anything to add or take away from it. He liked the document.
Mr. McDaniel commented on the Tax Credit Program for Historic Properties. He talked to a few
people who are just not aware that such a program exists and of course you need approvals
before you start the construction. When someone comes to the office for a Permit in the Historic
District, does anyone mention the program?
Mrs. Melson-Williams and Mr. Czerwinski replied that this was previously discussed that the
information could be on the Permit application highlighting the Tax Credit information within
the Historic District.
Mr. McDaniel asked the question because his neighbors Schmittinger & Rodriguez did extensive
work to a building in the Historic District and they were not aware of the Tax Credit.
5
Page 7
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2018
Ms. Mason mentioned that normally this information is provided in your paperwork by the
mortgage company or the person doing the title search or the attorney handling the settlement
when you go to closing on a property.
Mr. McDaniel mentioned that in this case there were two (2) examples of attorneys in the
Historic District who were not aware of the Tax Credit.
Mrs. Melson-Williams mentioned if you look under the Tax Credit information provided on page
5 Goal #2 which is to provide and promote incentives for preservation activities.
Recommendation #7 is the Tax Credit Program for Historic Properties. The first thing is to
continue the program we have and promote awareness of the program. You will find in the
preservation section that there is more emphasis on the public outreach that falls into Goal #3.
We found that the outreach was one of the things that needed to happen. There are brochures for
the Historic Tax Credit Program that also talks about the Downtown Development District area
which has another whole set of incentives. Some of them may not be in the District but the Tax
Credit information is being passed along. Typically, when a Permit comes in the office it is
submitted by the contractor; it is not the property owner. The property owner is the one that can
claim all the Tax Credit. Anytime there is a big project it is an opportunity for Staff to mention
the Tax Credit programs for the City, State and Federal. Even at the State level they have had the
same issue of people not knowing about the program.
Mr. McDaniel mentioned that the State has tightened up the process.
Mrs. Melson-Williams mentioned that the State program has had some procedural changes. She
would imagine with that becoming finalized they may go out with some type of outreach effort
for the new requirements for the State program.
Mr. McDaniel mentioned that Joan Larivee was very good, but she is now retired.
Mr. McDaniel asked if the Façade Program was still available. Mrs. Melson-Williams replied
yes, and it is getting good use. 25 West Loockerman Street is a participant of the program and its
called the Downtown Dover Partnership Façade Improvement Grant Program. She believes that
Schmittinger & Rodriguez was also a part of that grant program.
Mr. McDaniel mentioned again the Façade Improvement Program has to be approved before you
start the project. He recalls receiving funds for improvements to a building from the Façade
Improvement Grant program. He stated that he likes the way the program is written; it is just the
execution.
Mr. Czerwinski suggested that it be a requirement that the owner of the property sign a briefing
sheet regarding the benefits.
Mr. Street asked how long does the approval take for a grant application? Mrs. Melson-Williams
replied that the Tax Credit Program application is now Staff Review process. In the past, it had
to come before the Historic District Commission. It was changed in 2008.
6
Page 8
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2018
Mr. Street asked if it was a 30-day turn around? Mrs. Melson-Williams replied no, for the
program there is an authorization that happens up front before you start the project. The second
step is submission that the project is completed, and this is the exact amount of money I spent
because then the exact credit has to be calculated and forwarded to the Tax Assessor office.
Ms. Mason asked what would happen to the contractors if we sent them all something. I know it
would be time consuming. Mrs. Melson-Williams replied that the list of contractors in the City is
huge, over 1000.
Mr. Czerwinski mentioned perhaps the homeowners email address could be provided so that
when the contractor comes in and gets the Permit, then we can send an alert email with the Tax
Credit information to the homeowner.
Mrs. Melson-Williams stated that with the Preservation Chapter a lot of the hard work of doing
all these series of goals was actually done in previous Comprehensive Plans. It really has not
been totally rewritten but updated. She suggested that the Commission members also take a look
at the Economic Development section because there are some recommendations that are very
specific to areas of the City that include the Historic District area.
Mr. McDaniel asked what happens when this changes from Draft to actual. Mrs. Melson-
Williams replied that this is the Preliminary Draft so that we could get the Goals and
Recommendations out there because it is really the meat of the Comprehensive Plan along with
the two (2) sets of maps that have been issued at this point. The chapter writings are more facts
and information that explains things a little bit such as giving background on this particular topic.
The philosophy comes into play for the City. There have been some questions about who is
going to do all of this and who is going to fund all of this. It is meant to be a vision plan. We
worked on some of it from the 2008 Plan. It really depends on in the next 10 years how things
evolve.
Mr. Czerwinski asked if there will be another run through. Mrs. Melson-Williams mentioned that
this is a Preliminary Draft. If you have any markups or comments or read something in another
section and it makes absolutely no sense to you that is what we want to hear so that we can make
it a good document. At this point we are anticipating that a Draft of the Comprehensive Plan will
be issued in early 2019. Once there is a Draft issued there will be more public outreach and then
we will be moving into what is the formal public hearing review process that will need to happen
with Planning Commission and City Council to get to final adoption.
Mr. McDaniel asked what the goal for the final adoption was. Mrs. Melson-Williams replied that
as of today the deadline is February 9, 2019. We have a request for an extension of that
certification date and hope to be finished before summer.
Mr. McDaniel asked if Council meets in December. Mrs. Melson-Williams replied that Council
only holds one meeting in December. As of early this week, Council cancelled their second
meetings in November and December.
Again, Mrs. Melson-Williams encouraged the members to read the entire Preliminary Draft.
7
Page 9
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2018
Continued Discussion of Historic Preservation Chapter
Mrs. Melson-Williams mentioned that at this point there is not a Preliminary Draft to be issued.
It continues to be a work in progress. She was not sure if there will be anything for a December
meeting, but certainly would anticipate a January meeting and see a complete chapter at that
point.
Mr. McDaniel asked if it would be adopted in February. Mrs. Melson-Williams replied no.
Mr. Street moved to adjourn the meeting, seconded by Ms. Mason and unanimously carried 5-0.
Meeting adjourned at 3:58 PM
Sincerely,
Maretta Savage-Purnell
Secretary
8
Page 10
City of Dover Historic District Commission
Summary of Applications 2017
Updated thru December 31, 2018
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-17-01 CLG Grant Certified Local Information File Notice of Eligibility for Grant 3/1/2017; Grant Application submitted; Formal Award
Application for Government FFY2017 CLG Grant Application Letter received with Grant Agreement;
FFY2017 Application for Grant submitted 4/28/2017 to SHPO Grant Timeframe to cover 7/6/17-6/30/18;
Funding Grant Withdrawn
HI-17-02 Referral of 305 South Governors Building Permit for Permit #17-949 referred to HDC by City Permit Application received 6/6/2017;
Building Permit Avenue Renovations to Planner for Architectural Review Permit to be issued subject to conditions of
#17-949 Apartment Building Certification consultation; Considered at Architectural Review Certification; No
6/15/2017 HDC Meeting Action
HI-17-03 Referral of Sign 115 West Sign Permit: Wall Permit #17-1484 referred to HDC by City Permit Application received 8/16/2017;
Permit #17-1484 Loockerman Street Sign Planner for Architectural Review Permit issued for installation of wall sign.
Certification consultation; Considered at Applicant seeks to allow back-lit sign.
9/21/2017 HDC Meeting; Appealed to Determination by City Planner of
Planning Commission and considered on prohibiting the back-lit sign remained in
10/16/2017 place after two failed motions by the HDC.
Applicant appealed the decision of the HDC
to the PC. PC took action to approve
Architectural Review Certification to allow
backlighting of the sign.
HI-17-04 Governors Café 144 Kings Highway One story addition to 12/21/2017 Public Hearing and Review Project proposal to add a one-story building
Kitchen Addition SW kitchen with the Historic District Commission. addition to rear wing of the existing
Conditional Approval granted of building to expand the kitchen area. Project
Architectural Review Certification. received Conditional Use approval from the
Planning Commission (Application C-18-01).
Final Plan Approval granted 7/26/2018.
Building Permit #18-2072 issued 1/7/2019
per ARC.
Page 11
City of Dover Historic District Commission
Summary of Applications 2018
Updated thru December 31, 2018
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-18-01 CLG Grant Certified Local Information File Notice of Eligibility for Grant Grant Application received; awaiting
Application for Government 3/15/2018; FFY2018 CLG Grant Formal Award Letter and Letter of
FFY2018 Application for Application submitted 5/11/2018 to Agreement; Grant Timeframe to be 7/1/18-
Grant Funding SHPO 6/30/19
HI-18-02 Referral of 12 Kings Highway Demolition Permit - Permit #18-1104 referred to HDC by Permit Application received 6/25/2018;
Demolition NE, Elizabeth W. Accessory Structure City Planner 7/5/2018 for consultation Additional Information received 7/9/2018
Permit #18-1104 Murphey School on Architectural Review Certification; enabled ArchRevCert to be granted: Permit
Accessory Applicant provided additional issued 7/10/2018; Update on Status to
Structure information to Planner; Planner HDC on 7/19/2018; Structure Demolished
issued ArchRevCert 7/10/2018
HI-18-03 Referral of Fence 401 South Fence Permit Permit #18-1207 referred to HDC by Permit application received 7/13/2018;
Permit #18-1207 Governors Avenue City Planner 7/18/2018 for HDC authorizes fence height and
consultation on Architectural Review recommends materials; Permit to be
Certification; Considered at issued subject to conditions of
7/19/2018 HDC Meeting - approval Architectural Review Certification
granted for 6 ft. height with
recommendations on fence material
Page 12
City of Dover Code of Ordinances
Appendix B: Zoning Ordinance
Article 3 - District Regulations
Section 21. - Historic district (H).
21.1 Purpose. The purpose of this historic district regulation is to preserve and enhance
that unique character and value of the old portion of Dover as an area of special charm and
interest. It is particularly intended that the regulations prevent, in the historic district, any
change of conditions that would be deemed to be a disfigurement or degradation of the
present unique visual and architectural qualities of the district.
21.2 [Use and bulk requirements.] In the historic district, use[s] and bulk shall be governed
by those provisions of this ordinance related to the zone designation of each property, except
those aspects of building height, bulk and setback that are subject to architectural review as
set forth in article 10, section 3 of this ordinance.
21.3 [Architectural review certificate.] An architectural review certificate shall be required for
the demolition, construction, reconstruction, alteration or restoration of any new or existing
structure or where general exterior repairs are made within the historic district, as provided in
article 10, section 3 of this ordinance.
21.4 [Amendments, supplements and repeals.] The city council shall not take any action to
amend, supplement, or repeal the historic district in accordance with article 10, section 5,
amendments, without a report by the historic district commission in accordance with article
10, section 3.3, unless the historic district commission fails to render such a report within 75
days after its regularly scheduled meeting following referral by the city council.
21.5 [[Signs.] Signs shall meet the regulations found in article 5, section 4, supplementary
sign regulations.
(Ord. of 3-24-1986; Ord. of 7-26-1993; Ord. of 2-12-2001)
Page 13
City of Dover Code of Ordinances
Appendix B: Zoning Ordinance
Article 10 – Planning Commission
Section 3. - Historic district commission and architectural review.
3.1 Historic district commission established.
3.11 Creation and purpose. There shall be a historic district commission for the
purpose of assisting the planning commission and city planner in reviewing
applications for architectural review certifications as specified in subsection 3.2; and
for making recommendations for designation of historic district zones; and for
establishing guidelines for the preservation and conservation of historic district
zones; and for advising other officials and departments in the City of Dover in matters
concerning historic preservation; and for reviewing all proposed National Register
nominations in the City of Dover; and for acting as a liaison on behalf of the City of
Dover to individuals and organizations concerned with historic preservation; and for
carrying out programs of historic preservation education in the City of Dover.
3.12 Appointment. The commission shall consist of five members nominated by the
mayor and approved by the city council, who are residents of the City of Dover and
who have demonstrated special interest, experience, or knowledge in history,
architecture, or historic preservation. Two of the members, to the extent available,
shall be professional members representing the professions of architecture, history,
archaeology, planning, historic preservation or related disciplines. At least two
members shall be residents of the district, and at least one shall represent the
business within the district.
3.13 Term. The members of the commission shall serve for three-year staggered
terms. Vacancies shall be filled within 60 days in accordance with subsection 3.12.
3.14 Organization. The commission shall meet at least four times per year in a
place that is advertised in advance and open to the public and shall keep minutes of
its meetings that are available to the public. All review decisions shall be made in
public. The commission shall establish bylaws for its general procedure, which shall
include a section addressing conflicts of interest. The commission shall produce an
annual report of its activity that is kept on file for public review with the city planning
office.
3.2 Architectural review certification.
3.21 Effect of architectural review certificate. No building permit or certificate of
occupancy may be issued for any structure in the historic district until an architectural
review certificate is issued as required under article 3, section 21, subsection 21.3 for
the historic district.
3.22 Architectural review certification by the city planner.
(A) An architectural review certificate for specific classes of building permits,
including fences, signs, siding, window and door replacement, roofing, the
addition or replacement of decorative features, minor demolition, residential
additions, and other construction of a minor nature, may be issued by the city
planner, after a review and determination that the proposed construction is in
general accordance with the standards set forth in subsection 3.25.
Page 14
(B) The city planner may refer any permit application for demolition or
construction in the historic district for consultation with commission.
(C) All decisions of the city planner pursuant to this subsection shall be
documented on the building permit. When the city planner grants a
conditional approval under this section, all conditions of approval shall be set
forth in writing on the building permit. In the event of a denial, the reasons for
such denial shall be documented in a written notice of decision which shall
identify all elements of the application found to be contrary to the provisions
or intent of this section.
(D) An applicant may appeal the decision of the city planner to the historic
district commission and such appeal shall be considered as an architectural
review certification application to the historic district commission and shall
meet all of the requirements set forth in subsection 3.23.
3.23 Architectural review certification by the historic district commission.
(A) The historic district commission shall issue architectural review
certificates for the construction or demolition of single-family and two-family
homes, and nonresidential structures or additions involving a gross floor area
of 3,000 square feet or less, after review of the proposed construction and
after a determination that the construction is in general accordance with the
standards set forth in subsection 3.25 below.
(B) All applications to the historic district commission for architectural review
certification shall be subject to the procedures set forth in subsection 3.26.
(C) All decisions of the historic district commission pursuant to this
subsection shall be formalized in a written notice of decision. When the
commission grants a conditional approval under this subsection, all
conditions of approval shall be set forth in writing in the notice of decision. In
the event of a denial, the notice of decision shall state the reasons for denial
and shall identify all elements of the application found to be contrary to the
provisions or intent of this subsection.
(D) An applicant may appeal the decision of the historic district commission
to the planning commission, and such appeal shall be considered as an
architectural review certification application to the planning commission and
shall meet all of the requirements set forth in subsection 3.24 and subsection
3.26.
3.24 Architectural review certification by the planning commission.
(A) The planning commission shall issue architectural review certificates
referred or appealed to it, upon review of the recommendations of the historic
district commission and upon a determination that the proposed construction
is in accordance with the standards set forth in subsection 3.25.
(B) All applications to the planning commission for architectural review
certification shall be subject to the procedures set forth in subsection 3.26.
(C) All decisions of the planning commission pursuant to this subsection
shall be formalized in a written notice of decision. When the planning
commission grants a conditional approval under this subsection, all
conditions of approval shall be set forth in writing in the notice of decision. In
the event of a denial, the notice of decision shall state the reasons for denial
Page 15
and shall identify all elements of the application found to be contrary to the
provisions or intent of this subsection.
3.25 Architectural review standards.
(A) An architectural review certificate may be issued if it is found that the
architectural style, general design, height, bulk and setbacks, arrangement,
location and materials and structures affecting the exterior appearance are
generally in harmony with neighboring structures and complementary to the
traditional architectural standards of the historic district as set forth in the
historic district design guidelines and standards adopted by the planning
commission and as set forth in the United States Secretary of the Interior's
Standards for Rehabilitation.
(B) The city planner, historic district commission or planning commission
shall not consider normal maintenance and repair (see Definitions, article
12), interior arrangement, or building features not subject to public view.
3.26 Procedures for an architectural review by the historic district commission
and/or planning commission.
(A) Architectural preapplication meeting. Prior to action on any application
for an architectural review certificate, the applicant shall meet in person with
the city planner or his delegated representative. The purpose of such
conference shall be to discuss the proposed construction or other action
requiring the certificate in order to determine what information is useful in the
determination of conformity with the provisions and intent of the historic
district regulation as expressed in this article.
(B) Application and fee. The application to the historic district commission for
an architectural review certificate and related information shall be submitted
to the city planner at least 30 days prior to the historic district commission
meeting at which review is requested and shall be accompanied by a fee as
provided for in Appendix F—Fees and Fines.
(C) Public hearing. Prior to the review and action on an architectural review
certification, the historic district commission shall hold a public hearing
subject to the following public notification procedures:
(1) The applicant shall advertise the public hearing newspaper of
general circulation at least 15 days prior thereto.
(2) The applicant shall notify, by mail, all property owners within 200
feet of the extreme limits of the subject property as their names
appear on the municipal tax record at least 15 days prior thereto.
(3) The applicant shall post a notice outlining the date, time, place,
and nature of the hearing in a conspicuous location on the
property. Such notice shall be designed in accordance with
standards set forth by the planning commission.
(4) The applicant shall provide the planning office with a copy of the
notice, verification of newspaper publication, a date-stamped photo of
the property posting, and post office mail receipts indicating date of
mailing for all letters on or before the meeting date.
(5) Said notices shall state the date, time, and place of the hearings
before the historic district commission, a brief description of the
Page 16
project and shall state that a copy of the application and plan is on file
with the planning office for public review.
(6) If the planning commission is reviewing a project in accordance
with other sections of this article, then the public hearing notice on
those applications must also give notice of architectural review
certification.
(D) Application information. The applicant shall provide such information and
documents listed below which will satisfactorily illustrate the proposed action
as indicated in the architectural preapplication meeting required in subsection
3.26(A):
(1) All plan elements required in subsection 2.5.
(2) Plans and specifications indicating existing and proposed
development, including structures, architectural elevation
drawings, trees and any other landscaping, existing and
proposed, including the general design, location and orientation
of structures in relation to curb line, right-of-way line and
neighboring buildings, colors, and materials to be used on
exterior surfaces, detailed plans for any signs, photographs of the
existing site and neighboring buildings, and such other
information as will enable the historic district commission or
planning commission to determine conformity with the ordinance.
(E) City planner report. For each application to the planning commission the
city planner shall issue a report to the planning commission including
comments from other agencies detailing how the application conforms to the
requirements of the zoning ordinance and other provision of city and state
codes. This report shall not be deemed to represent a comprehensive list of
all city and state code requirements. The city planner shall transmit copies of
the proposed site development plan and the city planner's report at least
seven days prior to the date of the meeting at which approval of the site
development plan is to be requested.
(F) Historic district commission action. The historic district commission shall
act to review and render a recommendation to approve any such application
within 45 days of transmittal to the commission or within such additional time
as may be consented to by the applicant. The recommendation of the historic
district commission shall be forwarded to the planning commission and acted
upon by the planning commission in conjunction with action on the
associated site development plan. If a site development plan application is
not filed in accordance with the provisions of subsection 2.4 of this article
within one year of recommendation, the recommendation shall expire. The
historic district commission may grant a one-year extension of its
recommendation upon written request by the applicant. Such request shall be
made in writing to the planning office at least thirty days prior to the expiration
of the historic district commission's recommendation.
(G) Substantial amendments. Substantial amendments to an application or
an architectural review certificate shall be acted upon in the same manner as
the original plan.
(H) Expiration of architectural review certification issued by the historic
district commission.
Page 17
(1) Architectural review certification approval shall expire on the last
day of the 12th month after the date of approval if construction of
the work authorized or use permitted has not started or unless an
extension of time is applied for by the applicant and granted by
the historic district commission. Approval shall also expire if the
construction of work authorized has stopped for a period of one
year unless an extension of time is applied for and granted by the
historic district commission.
(2) Request for extension of approval shall be made no later than 30
days prior to the final approval expiration date. Upon receipt of
such request, the matter shall be considered at the next regularly
scheduled meeting of the historic district commission.
(3) In considering a request for an extension of approval, the historic
district commission shall consider, but not be limited to, the
following:
(a) Whether the project has been delayed for reasons
beyond the control of the applicant, excluding economic
or financial reasons.
(b) Whether the applicant has made substantial progress
toward obtaining final approvals.
(c) Whether there have been any significant changes in the
surrounding neighborhood.
(d) Whether there has been any related amendments to the
zoning map or text, or the comprehensive plan, or if any
waivers or variances have been granted.
(4) Requests for extensions shall be submitted in writing to the
planning office.
(5) Under no circumstances shall the historic district commission
grant extensions beyond 24 months from the date of first
approval.
3.3 Historic district amendments.
3.31 Historic district commission review required. Any motion or petition to amend,
supplement, or repeal a historic district by the city council in accordance with section
5, Amendments, shall require a report by the historic district commission as set forth
in article 3, subsection 21.4.
3.32 Review criteria for placing individual structures in a historic district. The historic
district commission may recommend that an individual structure or property be
placed in an existing contiguous historic district or be placed in a historic district
specifically created for the property or structure upon considering the following
criteria and factors:
(A) Significant value as part of the historical, cultural, artistic, social, ethnic or
other heritage of the nation, state or community;
(B) Association with an important person or event in national, state, or local
history.
(C) Representative of the distinguishing characteristics of an architectural
type inherently valuable for the study of a period, style, craftsmanship,
method of construction or use of indigenous material;
Page 18
(D) Notable work of a master builder, designer, architect, or artist whose
individual genius has influenced an era;
(E) The desire of the owner to have the property designated;
(F) Increased potential of economic or community development.
3.33 Review criteria for amendments or creation of new historic districts. The
historic district commission may recommend amendments to an existing historic
district, recommend repeal of an existing historic district or recommend the creation
of a new historic district upon considering the following criteria:
(A) Any criteria listed in subsection 3.32.
(B) Distinctive character or homogeneity of architectural design or dates of
construction throughout the area.
(C) Identifiable by clear and distinctive boundaries.
(D) Repetition of distinguishing architectural or land use characteristics
throughout the area.
3.34 Public hearing required. For all proposed amendments to the boundary of the
historic district, the historic district commission shall hold a public hearing subject to
the following public notification procedures:
(A) The planning office shall advertise the public hearing in a newspaper of
general circulation at least 15 days prior thereto.
(B) The planning office shall notify, by mail, all directly affected property
owners and all property owners within 200 feet of the extreme limits of
the properties proposed for addition to or removal from the district as
their names appear on the municipal tax record at least 15 days prior
thereto.
3.4 Demolition by neglect.
3.41 Responsibility of property owners. Property owners of properties within the
historic districts shall not allow their buildings to be demolished by neglect (see
Definitions, article 12) by failing to provide ordinary maintenance or repair.
3.42 Responsibility of the historic district commission. The historic district
commission shall monitor the condition of historic properties and existing buildings in
the historic district to determine if they are being demolished by neglect by failing to
provide ordinary maintenance and repair (see Definitions, article 12). In the event
that the commission determines a demolition by neglect is occurring, it shall carry out
the following:
(A) Determine and set forth steps required to remedy the situations or
defects.
(B) Direct the city planner to inform the property owners of its findings,
determination, and recommended remedies.
(C) In the event that the property owners fail to commence work within the
reasonable time allotted by the commission, the commission may direct
the building inspector to begin proceedings under chapter 22, buildings,
and building regulations, article XI, dangerous buildings, of the Code of
Ordinances for the City of Dover to bring about the repair or demolition of
the building.
Page 19
3.43 Responsibility of the city planner. The city planner shall notify the historic
district commission of buildings within the historic district that have been referred to
him by the building inspector that meet the definition of dangerous buildings under
the provisions of chapter 22 Buildings and Building Regulations, article XI Dangerous
Buildings, of the Code of Ordinances for the City of Dover. In such cases the
commission shall determine if the building is being demolished by neglect. Before
referring a property to the commission for consideration as demolition by neglect, the
city planner shall give written notice to the owner, occupant, mortgagee, lessee,
agent, and all other persons having an interest in said building, as shown by the
records of the recorder of deeds of the county, to appear before historic district
commission at the time, date and location specified.
(Ord. No. 2011-14, 8-8-2011)
Section 4. - Development information requirements.
4.1 In order to more effectively evaluate the probable impact of proposed development and
thereby to carry out the purposes of this ordinance when making decisions and recommendations
regarding development proposals, the planning commission, historic district commission, or city
planner may adopt a standard set of information requirements, which may be updated from time to
time as necessary.
4.2 The information requirements shall be administered by the city planner and shall be a
part of submission requirements for all applications to the planning commission.
(Ord. No. 2011-14, 8-8-2011)
Page 20
City of Dover Code of Ordinances
Appendix B: Zoning Ordinance
Excerpt of Definitions associated with Historic District activities.
Article 12 - Definitions
Unless otherwise expressly stated, the following terms shall, for the purpose of this
ordinance, have the following meanings. Words used in the present tense include the future.
The singular includes the plural and the plural includes the singular. The word "person"
includes a corporation, association or partnership, as well as an individual. The word "lot"
includes the word "plot." The term "occupied" or "used," as applied to any building, shall be
construed as though followed by the words "or intended, arranged or designed to be
occupied or used":
Accessory building: A building or use clearly incidental or subordinate to, and
customar[il]y in connection with, the principal building or use on the same lot.
Applicant: A landowner or developer, as hereinafter defined, who has filed
application for development, including his heirs, successors and assigns.
Architectural review certificate: A signed and dated document indicating the approval
of the City of Dover Planning Commission, or the historic district commission, or city planner
upon the authority of the historic district commission, for alteration, construction, relocation,
or demolition within the historic district.
Building: Any combination of materials forming a construction. The term "building" is
not intended to include underground construction which permits the use of the ground above
as if no construction existed. The term "building" shall include the term "structure," as well as
the following:
(a) Signs;
(b) Fences;
(c) Walls, except retaining walls projecting above the ground not more than three
feet at the higher ground level and not more than 6½ feet at the lower ground
level;
(d) Radio and television antennae, except for such antennae installed on the roof of
a building and extending not more than 15 feet above the highest level of the roof
of such building; and
(e) Porches, carports, bins and other similar structures;
(f) All areas used for outdoor display and storage of products for sale on the site for
more than 14 consecutive days or 21 days in a calendar year. Excluded from this
definition are approved motor vehicle, boat and trailer sales establishments;
contractors' yards; nurseries and landscaping material sales (where the sale of
these materials is the primary use on the lot); wholesale building supply stores
and lumber yards; or similar uses.
Demolition by neglect: Improper maintenance or lack of maintenance of a building,
structure or object which results in substantial and widespread deterioration of the building,
structure or object which threatens the likelihood of preservation and which presents a threat
to the public safety, health and welfare of the immediate community.
Page 21
Historic district: The geographic areas of Dover that have been designated by the
City of Dover, and graphically illustrated on the official zone map of the City of Dover, as
possessing a significant concentration of properties, buildings, structures or objects
associated with and representative of the historical development of Dover and which meet at
least one of the following criteria:
(a) Exemplifies or reflects the broad cultural, political, economic, or social history of
Dover, Kent County, the State of Delaware, or the United States of America; or
(b) Is associated with the lives of persons of historic importance or with events of
historic significance to Dover, Kent County, the State of Delaware, or the United
States of America; or
(c) Embodies distinguishing architectural characteristics which are invaluable
resources for the study, understanding and appreciation of periods, styles,
society, methods of construction, craftsmanship and the use of indigenous
materials; or
(d) Represents the notable work of master builders, designers or architects whose
designs, construction and craftsmanship have been recognized as distinctive and
whose work has influenced the period of time in which they lived.
Historic district design guidelines and standards: The document adopted by the City
of Dover Planning Commission as being the source reference document for construction and
maintenance of buildings, structures and additions within the Dover Historic District and
which is the guiding document for the historic district commission and city planner in their
review of applications for architectural review certification.
National Register of Historic Places: A federal list of cultural resources worthy of
preservation, authorized under the National Historic Preservation Act of 1966 as part of a
national program to coordinate and support public efforts to identify, evaluate, and protect
the nation's historic and archaeological resources. The national register program is
administered by the state historic preservation office and by the National Park Service under
the department of the interior.
Ordinary maintenance and repair: Work performed to prevent deterioration of a
building, structure or object, or any part thereof, by restoring the building, structure or object
as nearly as practical to its original condition prior to such deterioration or damage by using
replacement materials and applications, wherever possible, of the kind used in original
construction.
Public view: That which can be seen readily from a public street, public building or
public property, excluding views from alley rights-of-way.
Page 22
Summary of Permit Applications with Architectural Review Certification
2018 - Updated Thru 12-31-2018
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
1/23/2018 18-15 14 Loockerman Plaza, The Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for conversion
House of Coffi Renovations & Exterior required for interior work. of space to coffee shop. Exterior
Renovations work involves exterior finish repairs
and painting, construction of brick
paver patio entry with black metal
fence. Complete.
1/22/2018 18-135 29 Kent Avenue, Murphey Roof Permit Staff Approval. Replacement of roof.
School - Maintenance
Building
2/1/2018 18-42 2 Kings Highway NE Building Permit - Interior Staff Approval with No ArchRevCert Interior renovations for residential
Renovations required for interior work. elevation and kitchen remodeling.
Replacement of kitchen windows at
rear of house.
2/16/2018 18-167 111 West Loockerman Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for new tenant -
Street, Barber Shop Renovations required for interior work. barber shop.
2/12/2018 18-202 313 South State Street, Law Sign Permit Staff Approval. Projecting sign on metal bracket.
Office of Sean Lynn (Annex) Installed.
2/16/2018 18-222 410 Legislative Avenue, Administrative Permit Staff Approval. Memorial/Public Art installation for
Legislative Mall Volunteer Firefighters Memorial on
southwest corner of Legislative
Mall.
2/28/2018 18-321 116 West Water Street, Sign Permit Staff Approval. Replacement wall sign for law
Parkowski, Guerke & office. Installed.
Swayze
2/27/2018 18-325 54 South State Street, Temporary Sign Permit Staff Approval. Installation of vinyl banner 3/19/18-
Presbyterian Church 4/2/18.
3/8/2018 18-147 206 West Loockerman Building Permit - Interior Staff Approval. No ArchRevCert Repair of drywall after sprinkler
Street, Bayard Apartments Renovations required for interior work. damage.
3/29/2018 18-345 9 West Loockerman Street, Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for addition of
My Roots Renovations required for interior work. hair salon area/chair.
Page 23
Summary of Permit Applications with Architectural Review Certification
2018 - Updated Thru 12-31-2018
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
3/5/2018 18-369 14 Loockerman Plaza, The Fence Permit Staff Approval. Installation of 3 ft. black metal
House of Coffi fence around outside patio of
restaurant. Installed.
4/4/2018 18-426 131 West Loockerman Building Permit - Interior Staff Approval. No ArchRevCert Interior renovation for tenant fit out
Street, Caviar Beauty Bar Renovations required for interior work. of personal service establishment.
4/9/2018 18-450 304 South State Street, Sign Permit Staff Approval. Installation of wall sign for office
Gwinn Homes (Office) tenant.
4/4/2018 18-471 25 West Loockerman Street Building Permit - Exterior Staff Approval. Replacement of siding, windows, a
Renovations new metal roof on pent roof.
Removal of shutters and removal of
projecting box sign. Project
5/29/2018 18-663 410 South State Street, Building Permit - Exterior Staff Approval. Repointing and select brick
Offices of Schmittinger & Renovations replacement project. Complete.
Rodriguez
5/25/2018 18-685 150 Martin Luther King Jr Roof Permit Staff. No ArchRevCert required. Replacement/Repair of flat roof
Boulevard South, Tatnall area that is not visible.
Building
5/3/2018 18-718 523 South State Street, Temporary Sign Permit Staff Approval. Vinyl Banner installed on decorative
Christ Church posts. Installation period 5/1/18-
8/1/18.
5/25/2018 18-843 54 South State Street, Roof Permit Staff Approval. Replacement of existing asphalt
Presbyterian Church shingle roof with new roof.
7/11/2018 18-1104 12 Kings Highway NE, Demolition Permit Staff Approval after submission of Demolition of accessory structure.
Murphey School additional information. Originally referred to HDC (HI-18-
02). Additional information allowed
Staff to complete Review; updated
HDC on 7/19/2018. Permit issued
and building demolished.
7/17/2018 18-1117 6 Elm Terrace Roof Permit Not reviewed by Planning Staff. Replacement of roof. Later review
Issued by Admin Staff. shows house as asphalt shingle roof
already.
Page 24
Summary of Permit Applications with Architectural Review Certification
2018 - Updated Thru 12-31-2018
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
7/25/2018 18-1193 410 South State Street, Building Permit - Exterior Staff Approval Rehabilitation and repair of front
Offices of Schmittinger & Renovations porch and porch floor & ceiling.
Rodriguez
7/20/2018 18-1244 132 W Loockerman Street, Siding Permit - Fascia Not reviewed by Planning Staff. Repair of fascia and gutter.
The Golden Fleece Issued by Admin Staff.
8/10/2018 18-1203 108 E Water Street Building Permit - Interior and Staff Approval. No ArchRevCert Interior work to reconfigure office
Exterior Renovations required for interior work. space areas. Accessibility Ramp at
rear of building being
reconstruction; limited visibility due
to location and landscaping.
8/8/2018 18-1271 228 W Loockerman Street, Building Permit - Interior and Staff Approval. No ArchRevCert Interior work on floor and joist
Commercial Building Exterior Renovations required for interior work. system due to water damage.
Exterior work is brick repointing in
select areas related to roof repairs.
8/17/2018 18-1298 25 Kent Avenue, Elizabeth Building Permit - Exterior Staff Approval. Construction of round brick walled
W. Murphey School Renovations planter near Sanford Cottage.
8/2/2018 18-1349 321 & 323 S Governors Fence Permit Staff Approval. Establishment of outdoor patio area
Avenue on side of building fenced in by
black metal fence. Installed.
8/6/2018 18-1377 535 S State Street Roof Permit Not reviewed by Planning Staff. Replacement of existing porch roof.
Issued by Admin Staff.
8/28/2018 18-1567 124 S State Street, Verizon Siding Permit - Repointing Staff Approval. Patch repointing of select area of
Building brick wall.
9/13/2018 18-1523 148 S Bradford Street, Law Sign Permit Staff Approval. Installation of new post sign.
Office
9/14/2018 18-1563 111 West Loockerman Building Permit - Exterior Staff Approval. Renovations of rear entrance
Street (Rear) Renovations vestibule to relocation existing door
system and enclose vestibule area.
9/19/2018 18-1576 403 W Loockerman St Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for new tenant
Renovations required for interior work. fit-out.
Page 25
Summary of Permit Applications with Architectural Review Certification
2018 - Updated Thru 12-31-2018
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
18-1636 304 S Governors Ave, Reith Roof Permit Not reviewed by Planning Staff. Roof replacement project.
9/13/2018 Hall Issued by Admin Staff.
9/7/2018 18-1659 113 S Bradford Street Administrative Permit Not reviewed by Planning Staff. Foundation (brick and concrete
Issued by Inspection Staff. block) repair due to flood damage.
9/13/2018 18-1661 211 W Loockerman Street, Fence Permit Staff Approval. Replacement of fence/gate system
Janaid's between buildings.
10/8/2018 18-1204 19 N American Avenue Building Permit - Exterior Staff Approval. Repairs to Front Porch posts and
Renovations railing systems; keeping decorative
brackets. Replacement of siding.
10/8/2018 18-1206 19 N American Avenue Fence Permit Staff Approval. No ArchRevCert Replacement of portion of rear
required due to lack of visibility. fence.
10/2/2018 18-1690 147 S Governors Avenue, Sign Permit Staff Approval Wall sign on north wall and
Sweet & Treats projecting sign on front façade.
11/13/2018 18-1892 136 W Loockerman St, Sign Permit Staff Approval. Window sign
Brooks Men's Salon
11/20/2018 18-1893 316 S Governors Avenue, Building Permit - Exterior & Staff Approval Brickwork - Repair and repointing
Old Brick Church Interior Renovations and MEP Improvements
11/1/2018 18-1932 140 S State St, Grey Fox Window Permit Not reviewed by Planning Staff; Window work.
Grille Issued by Administrative Staff.
11/21/2018 18-1934 29 Kent Avenue, Murphey Building Permit - Interior Staff Approval Interior Renovations related to
School - Maintenance Renovations Boiler Room/Storage Area level to
Building infill space.
11/9/2018 18-1964 225 S State St, HJJF Law Roof Permit Not reviewed by Planning Staff; Research shows that project was
Offices Issued by Administrative Staff. replacement of existing asphalt
shingle roof with same.
11/15/2018 18-1988 54 South State Street, Temporary Sign Permit Staff Approval Installation of vinyl banner 12/3-
Presbyterian Church 12/26/18.
11/28/2018 18-2038 8 W Loockerman St, Citizens Roof Permit Not reviewed by Planning Staff; Replacement of old roof with new
Bank Building Issued by Administrative Staff. roof. Research shows a flat roof
building so it is not visible.
Page 26
Summary of Permit Applications with Architectural Review Certification
2018 - Updated Thru 12-31-2018
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
11/28/2018 18-2043 6 Elm Terrace Window Permit Not reviewed by Planning Staff; Window and door replacement
Issued by Administrative Staff. project.
12/3/2018 18-1991 4 The Green Sign Permit Staff Approval Wall mounted blade-style sign
facing South State Street.
12/6/2018 18-2045 15 Kings Hwy NE, Building Permit - Exterior & Staff Approval Repair and replacement of west
Professional Offices Interior Renovations sunroom windows; select shiplap
siding replacement; and
reinforcement of floor joist systems.
12/11/2018 18-2063 2 N State St, Paradee Building Permit - Interior Staff Approval Interior wall, ceiling, and floor
Financial Offices Renovations finishes repaired due to water leak
damage.
Page 27
Summary of Permit Applications with Architectural Review Certification
2019 - Updated Thru 1-31-2019
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
1/7/2019 18-2072 144 Kings Hwy SW, Building Permit - Building HDC Approval with Conditions on Construction of Kitchen Addition on
Governors Café Addition ARC 12/21/07: Application HI-17-04: west elevation. Project also subject
Staff Approval per ARC to Conditional Use C-18-01. Permit
issued.
Page 28
HI-19-01 Information on Downtown Dover Mural Project –
Presentation on Downtown Mural Project from the Design
Committee of the Downtown Dover Partnership. And including
consultation regarding preparation of the South Bradford Street
elevation (east wall) of 109-113 W. Loockerman Street owned
by Harrington Center City, LLC.
The following information is provided:
• Aerial Map of West Loockerman Street vicinity
• Information Packet:
o Cover Letter/Narrative of Project
o Street Map
o Photograph of South Bradford Street elevation (east
wall of 109-113 W. Loockerman Street
o Example Postcards (3)
o Mural Design Sketches
o Mural Design Idea Mock-ups (on wall elevation)
o Mural Examples from other cities
Page 41
P
lan
nin
g&In
spe
ctio
nsV
iewM
ap
2
/12
/20
19,1
1:1
4:5
2AM 1
:1,1
28
0 0
.01 0
.02 0
.04m
i
P
arc
e lsO
uts
ideD
over
D
overP
arc
e ls 0 0
.01 0
.03 0
.06k
m
Source:E sri, D
igita
lGlo
be,Ge
oE ye,Earth
sta
rGeog
raphic
s,CN
ES /
A
irb
u sD S,U S
D A ,U SGS,Aero
G RID
, IG N,a
nd th
eG ISUs
e r
Comm u
n ity
C
ityo
fDo
ver,D
ela
w a la
re-P nn
ingD e
p artme nt
Sta
teofDe
laware
,M ic
ro s
o ft|