CITY OF DOVER PLANNING COMMISSION
AGENDA
Monday, April 15, 2019 – 7:00 P.M.
City Hall, City Council Chambers
15 Loockerman Plaza, Dover, Delaware
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF AGENDA
1) The Re-evaluation Review of Conditional Use Application C-17-04 House of Pride Office at
45 S. New Street will not be heard by the Planning Commission on April 15, 2019 due to
incomplete public notice. This Re-evaluation Review and its Public Hearing will be
rescheduled for a future Planning Commission meeting and will be subject to Public Notice
requirements for the new meeting date.
ADOPTION OF MINUTES OF MEETING of March 18, 2019
COMMUNICATIONS & REPORTS
1) Reminder: The next Planning Commission regular meeting is scheduled for MONDAY, May
20, 2019 at 7:00pm in the City Council Chambers.
2) Update on City Council Actions
3) Department of Planning & Inspections Updates
a. Education and Training Opportunities
OPENING REMARKS CONCERNING MEETING PROCEDURES
OLD BUSINESS
1) Request for Extensions of Planning Commission Approval: None
NEW APPLICATIONS
1) SB-19-01 Minor Subdivision Plan Lands of Kraft Foods Group Inc. at 1250 W. North Street –
Public Hearing and Review of a Minor Subdivision Plan application to permit the subdivision of
105.6689 +/- acres of land into: the new Lot 1 of 16.3949 acres and the Residual of 89.2740
acres. The property is located on the south side of West North Street and west of POW-MIA
Parkway. The property is zoned IPM (Industrial Park Manufacturing Zone). The owner of record
is General Foods Corp. (Kraft Foods Group, Inc.) Property Address: 1250 West North Street.
Tax Parcels: ED-05-076.00-01-12.00-000 and ED-05-076.00-01-10.00-000. Council District 2.
2) S-19-07 Retail Facility at 515 South DuPont Highway – Public Hearing and Review of a Site
Development Plan Application to permit construction of a one-story 8,050 SF retail building
and accompanying site improvements. The site is currently vacant. The subject area is 0.91
+/- acres located on the east side of South DuPont Highway south of Cowgill Street and
north of Public Safety Boulevard. The property is zoned C-4 (Highway Commercial Zone).
The owner of record is Kent Del Properties, LLC. Property Address: 515 South DuPont
Highway. Tax Parcel: ED-05-077.00-01-12.00-000. Council District 2. The site was subject
of Site Plan S-08-08 Nastatos Office Building granted conditional approved by the Planning
Page 2
City of Dover Planning Commission Agenda
Public Hearing: April 15, 2019
Page 2 of 2
Commission at their March 2008 meeting; it did not achieve Final Plan approval and has
since expired. Waivers Requested: Reduction in Number of Loading Spaces: Reduction of the
Arterial Street Buffer; Elimination of Fence Component of Opaque Barrier Requirement.
NEW BUSINESS
1) Project for Dover’s 2019 Comprehensive Plan
a. Update on Project Activities
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Posted Agenda: April 5, 2019
Page 3
CITY OF DOVER PLANNING COMMISSION
MARCH 18, 2019
The Regular Meeting of the City of Dover Planning Commission was held on Monday, March
18, 2019 at 7:00 PM in the City Hall Council Chambers with Vice-Chairwoman Dr. Jones
presiding. Members present were Mr. Adams, Mr. Roach, Mr. Holt, Mr. Baldwin, Dr. Jones, and
Ms. Maucher. Ms. Edwards, Mrs. Welsh and Mr. Tolbert were absent.
Staff members present were Mr. Dave Hugg, Mrs. Dawn Melson-Williams, Mr. Jason Lyon, Mr.
Julian Swierczek, Mr. Eddie Diaz, Mrs. Kristen Mullaney and Deputy City Solicitor Mr.
Williams Pepper.
APPROVAL OF AGENDA
Ms. Maucher moved to approve the agenda as submitted, seconded by Mr. Holt and the motion
was unanimously carried 6-0 with Ms. Edward, Mrs. Welsh and Mr. Tolbert absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF
FEBRUARY 19, 2019
Mr. Holt moved to approve the Planning Commission Meeting minutes of February 19, 2019,
seconded by Mr. Adams and the motion was unanimously carried 6-0 with Ms. Edward, Mrs.
Welsh and Mr. Tolbert absent.
COMMUNICATIONS & REPORTS
Mr. Hugg stated that the next Planning Commission regular meeting is scheduled for Monday,
April 15, 2019 at 7:00pm in the City Council Chambers.
Mr. Hugg provided an update on the regular City Council and various Committee meetings held
on February 25 & 26, 2019 and March 11 & 12, 2019.
Mrs. Melson-Williams stated that the University of Delaware’s Institute for Public
Administration continues their training series. They do have one scheduled for Friday morning of
this week, March 22, 2019. It is titled “Advanced Land-Use and Development Administration.”
If any of the Commissioners are interested in attending that training please see Planning Staff
and they will see if there is any space available for that training. In the future, they are planning
another class related to “Creating a Flood Ready Community.” When they have the actual date
for that class, they will pass it along.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the
meeting.
OLD BUSINESS
1) Request for Extensions of Planning Commission Approval:
a. S-17-02 Mitten Industrial Park at 141 Lafferty Lane (Revised 2/28/2017) – Request for
One Year Extension of the Planning Commission conditional approval granted March 20,
1
Page 4
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
2017 for a Site Development Plan application to permit construction of a 9,600 S.F.
building, an equipment processing & storage area, and associated site improvements. The
40.09 acre+/- subject site is located on the east side of Lafferty Lane north of the Kings
Cliffe Manufactured Home Park. The property is zoned IPM (Industrial Park
Manufacturing Zone) and MH (Manufactured Housing Zone) and is partly subject to the
AEOZ (Airport Environs Overlay Zone: Accident Potential Zone I and Noise Zone A).
The project is subject to Performance Standards Review Application. The owner of
record is Matthew E. Mitten. Property Address: 141 Lafferty Lane. Tax Parcels: part of
ED-05-077.00-01-26.00-000, ED-05-077.00-01-27.00-000, and part of ED-05-086.00-01-
08.00-000. Council District 2.
Representatives: Mr. Matt Mitten, Owner
Mrs. Melson-Williams stated that this is a request for an extension of Planning Commission
approval. This application was reviewed by the Planning Commission back in March 2017. With
that action taken by the Planning Commission in March 2017, they had two years to finalize the
plans and commence construction of the project. With a letter of February 27, 2019, they are
asking for a one-year extension of that approval. The letter submitted by Merestone Consultants,
who is now the engineer of record working on the project, has been working to complete the
engineering and final site approvals necessary from the various agencies. They took over the
project according to their letter in September 2018. Their letter goes on to outline the progress
that has been made with submittals to DelDOT, the Kent Conservation District, and the City’s
Public Works Office with submittals forthcoming to the City’s Fire Marshal’s Office and
Planning Office, once landscape designs are finalized.
Mr. Mitten stated that they have no statements at this time.
Ms. Maucher moved to approve S-17-02 Mitten Industrial Park for the request for a one year
extension, seconded by Mr. Holt and the motion carried 6-0 by voice vote with Ms. Edward, Mrs.
Welsh and Mr. Tolbert absent.
b. S-17-06 Secure Storage Revised Site Plan, Phases 2 & 3 – Request for a One Year
Extension of the Planning Commission conditional approval granted March 20, 2017 for
a Site Development Plan application to permit construction of Phases 2 & 3 of a mini-
storage facility consisting of five (5) storage buildings, on a site already containing 14
storage buildings (Phase 1), for a total of 19 buildings. The new buildings total 94,500
S.F. Associated improvements including a boat and RV parking area and a second site
entrance are also proposed. The project is subject to Performance Standards Review
Application. The 18.68-acre subject site is located on the north side of Lafferty Lane, east
of South Bay Road. The property is zoned IPM (Industrial Park Manufacturing Zone).
The owner of record is Secure Storage LLC. Property address: 640 Lafferty Lane. Tax
Parcel: ED05-077.00-01-25.00-000. Council District 2. The Final Site Plan approval was
granted October 16, 2017.
Representatives: None
2
Page 5
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Mrs. Melson-Williams stated that this is a request for a one-year extension. This application was
also heard at the March 2017 meeting of the Planning Commission and at the time was approved
for what is Phases 2 and 3 of the Secure Storage Mini-Storage Facility project to add five storage
buildings on the site continuing what was a build-out from Phase 1. The project ultimately has
moved through the plan approval process. They received Final Plan Approval in October 2017.
In doing so and achieving approvals from the agencies, the plan was ultimately revised from five
buildings to four buildings as a design refinement that did not require its appearance back before
Planning Commission. All of the agencies granted approvals at that time and the project is
eligible to pull Building Permits; however, while they are anticipating a late Spring or early
Summer start in 2019 because they will not be underway by the end of March, they are seeking a
one-year extension of this Site Plan Application. That is presented to the Planning Commission
for consideration by their letter dated February 12, 2019.
Mr. Holt moved to approve S-17-06 Secure Storage Revised Site Plan, Phases 2 & 3 for a one-
year extension, seconded by Mr. Baldwin and the motion carried 6-0 by voice vote with Ms.
Edward, Mrs. Welsh and Mr. Tolbert absent.
2) Continued Review of New Application:
a. S-19-01 Tommy Car Wash at 656 North DuPont Highway – Continued Review of a
Site Development Plan Application to permit construction of a new 5,194 SF Car
Wash structure and accompanying site improvements. The previous structures on the
site have been demolished, and the site is now vacant. The property consists of a total
0.940+/- acres and is located on a site bounded by North DuPont Highway to the
northeast, and Lepore Road to the southeast. The property is zoned C-4 (Highway
Commercial Zone) and is partly subject to the SWPOZ (Source Water Protection
Overlay Zone). The owner of record is Kathleen J. Gray. The equitable owner is
Manpreet Mattu. Property Address: 656 North DuPont Highway. Tax Parcel: ED-05-
068.09-01-09.01-000. Council District 3. Waiver Request: Reduction of Arterial
Street Buffer. The Public Hearing and Review of Application S-19-01 began at the
February 19, 2019 Planning Commission Meeting; it was tabled seeking additional
information.
Representatives: Mr. John Paradee, Baird, Mandalas and Brockstedt; Mr. Kevin Minnich,
Minnich Engineering; Mr. Matt Dehahn, Tommy Car Wash
Ms. Maucher moved to lift application S-19-01 Tommy Car Wash at 656 North DuPont Highway
from the table, seconded by Mr. Holt and the motion was carried 6-0 by voice vote with Ms.
Edwards, Mrs. Welsh and Mr. Tolbert absent.
Mr. Adams has recused himself from deliberations on this application due to previous business
interactions with one of the speakers who provided public testimony in February.
Mrs. Melson-Williams stated that there continue to be five members of the Planning Commission
present. That is a quorum in order for the Commission to conduct business.
3
Page 6
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Mr. Paradee stated that he represents Blue Sky Dover Properties, LLC dba Tommy Car Wash.
With him tonight is Mr. Kevin Minnich who is the engineer for the project as well as Mr. Matt
Dehahn from Tommy Car Wash. He is an equipment and component sales manager for the
company and he is available to answer any technical questions about the facility that you might
have. Also, the principals are here along with Realtor Mr. Carl Kaplan.
He has handed on a copy of a supplemental submission that he would like to submit for the
record. Rather than bore you by reading it, he will try to summarize it quickly. It is his
understanding that some of the people who testified in opposition at the last hearing had
submitted a letter as well and he would like to briefly address that letter in his response.
The first important point that the Commission should take note of is that under Delaware Law,
competitors such as the gentleman who spoke to the Commission last month in opposition of this
application have no legal standing to object. In this particular case, if you think about it, it makes
sense because the people who spoke in opposition before you don’t own any property anywhere
near the site. They haven’t articulated any specific or particularized injury that would show how
their property would be impacted if this application were approved. Instead they were motivated
perhaps by concerns about competition and tried to raise some issues that frankly they don’t
believe would have standing to raise. They questioned the Planning Director’s interpretation of
some language in the SWPOZ (Source Water Protection Overlay Zone) and they also challenged
the Commission’s ability to grant a waiver request. First, the Planning Staff got it right as they
most always do. Delaware Law provides that an administrator’s interpretation of their own
regulations is entitled to some difference. These are the professionals who deal with the Code
every day; they helped draft it and they understand how it works. When they interpret it and tell
you that they think it mean this, you should listen to them. Secondly, Delaware courts have
repeatedly held that if there are two reasonable alternative interpretations of a statute, the
interpretation that favors the land owner controls. In other words in the event of a tie, if it is
ambiguous or vague and you are not really sure, you give the benefit of the doubt to the property
owner. Here, they submit that the Department’s interpretation of Article 3 Section 29.5 of the
City’s Zoning Ordinance is not only entitled to a presumption of validity but the burden of
rebutting that presumption rests on the party who would challenge it. His submission goes into
all of the reasons why they think the Planning Department got it right. He won’t belabor that
except he will come back and rebut some of the things that the opposition had said.
There is another legal doctrine that is at play here. It has a really funny sounding Latin name
called “ejusdem generis” and he almost always butchers it. What it really means is that where
general words follow an enumeration of things or items by words of a more particular and
specific meaning. The general words are not to be construed in their widest extent but are to be
held as applying only to things of the same general kind or class as those specifically mentioned.
In Article 3 Section 29.5, you have the words “automobile service station” following the phrase
“gas station”. The point is that “automobile service stations” are limited to those things which are
a subset of gas stations. It is an important point; probably not something that you will stay up late
tonight worrying about but it is an important point. In the letter dated March 12, 2019 from Mr.
Shawn Tucker, he respectfully submits that Mr. Tucker is simply wrong when he says that the
use of the property as a car wash constitutes a “motor vehicle service station”. He then talks
about whether or not there are definitions in the Code that may help you here. For example, in
4
Page 7
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Section 26-31 of the City Code, the definition of car wash is “operating a continuing business of
cleaning, washing or waxing motor vehicles for profits.” It doesn’t say anything about repairing
them or reconditioning them in any way. By contrast, in Section 26-31 of the Code, although
there is no definition for “motor vehicle service station”, there is a definition for “motor vehicle
serviceman” because that job requires a Business License under the City Code. It defines motor
vehicle serviceman as “every person operating a business of repairing, rebuilding, repainting or
otherwise reconditioning motor vehicles or their parts.” That is a very different definition than
car wash. There is really no interaction or interplay between the two. If you look at the structure
of the Zoning Ordinance, you realize that motor vehicle repair or service is very tightly regulated
under the City Zoning Ordinance. There are many instances where it is addressed as a permitted
use subject to conditions or a prohibited use outright. For example, it is an accessory use in the
IO (Institutional and Office Zone) and it’s prohibited in C-1 (Neighborhood Commercial Zone),
C-1A (Limited Commercial Zone) and C-2 (Central Commercial Zone) but it’s permitted in C-3
(Service Commercial Zone) and C-4 (Highway Commercial Zone) subject to several qualifying
conditions dealing with things like hydraulic jacks and that kind of stuff. All of the stuff that
talks about service stations and nothing to do with car washes. Of course motor vehicle service is
prohibited in the shopping center district. There are plenty of places in the Code that talk about
what motor vehicle service repair means and then you have a definition of car wash and they are
distinctly two different things. That is the point that he wanted to make in response to Mr.
Tucker’s letter.
With regard to the waiver request, respectfully Mr. Tucker’s letter is wrong when he says that we
or the staff has failed to articulate how they satisfy the four criteria. His letter addresses those
four criteria so he won’t belabor that. But it is interesting that Mr. Tucker admits that they meet
Numbers 1 and 4. He disputes whether they meet 2 or 3 but he will submit to you that they very
easily meet Number 2 which is that the character of the surrounding built environment, that it is
the other properties adjacent to them don’t have any buffers at all. The Staff Report addresses all
of those criteria very carefully and he would defer to Staff and suggest that they do the same.
They got it right on the waiver request.
Mr. Tucker’s reliance in his letter on the NEPA vs. City of Lewes case is simply unfounded and it
sounds nice to cite it but it’s really not on point. That case deal with a Board of Adjustment case
in the City of Lewes. The City of Lewes had given its Board of Adjustment some powers that
were greater than the General Assemblies had given to Boards of Adjustment under Title 22
Chapter 3. That case simply stands for the proposition that the City couldn’t give greater powers
to the Board of Adjustment than the General Assembly did; therefore, the Court found that any
reliance on that additional authority was inappropriate because it conflicted with the State statue.
You don’t have that here. What you have here is the City of Dover has said in the Zoning
Ordinance that you can have certain uses and certain uses are prohibited. There are some uses
that the Planning Commission is empowered to grant waivers for. You have the legislative body,
the authority of the City government saying these are all of the rules for the Zoning Ordinance
and by the way we are going to condition this one slightly because we are going to let the
Planning Commission grant waivers. That is an expressed delegation by the City of Dover to the
Planning Commission that is not violated by any provision in the Delaware Code whatsoever.
He will submit to the Commission that there are multiple jurisdictions (he can’t think of any that
don’t have this ability), other municipalities in the State of Delaware similarly give their
5
Page 8
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Planning Commission the ability to grant waivers for certain things. It’s permissible and the
exercise of that waiver here is appropriate. This is a Site Plan application; it is not a Rezoning
and it meets all of the Code requirements. They would respectfully request that the Planning
Commission grant approval.
Mr. Swierczek stated that this is the continued review of S-19-01 Tommy Car Wash at 656 North
DuPont Highway. The review of this application was tabled at the February 19, 2019 meeting.
The application is to permit construction of a 5,194 SF car wash facility on the site previously
occupied by Kirby and Holloway Family Restaurant. Along with the Site Plan application, the
applicant had submitted a waiver request from the requirements of the Arterial Street Buffer
mainly to reduce it from thirty feet to ten feet. The available area for the buffer was reduced
since a portion of the property on this frontage area is being dedicated as right-of-way to Route
13. Staff continues to recommend approval of this waiver request. A public hearing on this
application was opened and closed at the February meeting of the Planning Commission. During
that meeting, members of the public had challenged the City’s interpretation of Code, mainly
Article 3 Section 29.5 which specifically lists prohibited uses in the SWPOZ (Source Water
Protection Overlay Zone) as well as the City being able to administratively approve the waiver of
the arterial street buffer. For these reasons, the body moved to table the review of this
application. In the packets, all members of the Planning Commission should have received a
memo updating the status of this application from the Planning Office. The Director of Planning,
Mr. Dave Hugg consulted with the City Solicitor who agreed with the interpretation of the
Planning Office in stating that the use of a car wash was not prohibited in the SWPOZ – Tier 3
Excellent Recharge Area (Source Water Protection Overlay Zone). The waiver request can be
reviewed by the Planning Commission directly. For these reasons, Planning Staff continues to
support approval of Application S-19-01 under the conditions as stated in the DAC Report of
February 6, 2019. In the motion, the members of the Planning Commission should act according
to the recommendations as described in the DAC Report and agency comments from February 6,
2019. Specifically, the DAC Report lists three recommendations found on Pages 6 and 7.
Number 1 that in an effort to eliminate any potential question of compliance, Planning Staff had
recommended that the applicant either move and/or condense the building so that all car wash
activities contained within the structure are located outside the boundary of the SWPOZ (Source
Water Protection Overlay Zone). Number 2 for the waiver request, Staff had recommended
approval of the waiver request as related to the Arterial Street Buffer reducing the requirement of
thirty feet to ten feet in width. The plan proposes a landscaped area with tree and shrub plantings
between the on-site drive aisle and the new street frontage sidewalk. The available area for the
buffer was reduced again since a portion of the property on the frontage area was being dedicated
as right-of-way to Route 13. Number 3 is regarding the historic sign. To further subsection 2.28
related to architectural characteristics of proposed buildings, Staff had recommended that the
Planning Commission request that the applicant keep, maintain and refurbish the historic Kirby
and Holloway sign in its current location on the property. The architectural characteristics of this
pylon sign including the shapes and arrangements of the five sign panels and the curving arrow
are unique and should be kept; however, the sign panels may otherwise be refaced to suit the
needs of the new business as part of the sign refurbishment. The motion should refer to act upon
these three items.
6
Page 9
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Mr. Paradee stated that the NEPA Case is actually on appeal to the Delaware Supreme Court and
oral arguments are scheduled for next week. That is another reason to not pay attention to that
case.
Mr. Holt questioned if the retention of the wastewater was satisfactory with Mr. Hugg and the
City? Is that going to be satisfactory to prohibit leakage into the groundwater? Responding to
Mr. Holt, Mr. Hugg stated that he would defer to Public Works but the short answer is that they
would meet all of the requirements necessary for addressing runoff or surface water.
Mr. Lyon questioned if Mr. Holt was referring to stormwater or wastewater? Responding to Mr.
Lyon, Mr. Holt stated that he was referring to wastewater.
Mr. Lyon stated that the City of Dover is a contract user for the Kent County Wastewater
Treatment Plant so we have to follow any rules that they have with regards to the discharge of
the effluent waste that goes into the system. The applicant will have to make sure that they get
the approval for that before they satisfy the Department of Public Works approval. Typically,
this is something that gets allowed into the system.
Ms. Maucher questioned if conditions are legally binding if the Commission makes a motion to
approve with conditions and those conditions aren’t met? Or can they not move forward unless
those conditions are met? Responding to Ms. Maucher, Mrs. Melson-Williams stated that as part
of the DAC Report, the Planning Staff always looks to the series of objectives that are outlined in
the Code for Planning Commission when considering Site Development Plans and they add
recommendations. The section is titled “Recommended Additional Considerations to Meet Code
Objectives.” In this section is where we typically relate Staff’s opinion on any waiver requests
and any other conditions or safeguards that as the Code recalls are related to public health, safety
and welfare; comfort and convenience of the public; and dealing with residents in the immediate
area. The safeguards or conditions are meant to further express the intent of the Zoning
Ordinance and in this case there are three items that they identified. The first one is related to the
building’s position versus the SWPOZ (Source Water Protection Overlay Zone). Right now a
piece of the building is within the SWPOZ (Source Water Protection Overlay Zone). The second
item deals with the Arterial Street Buffer request where Staff is recommending approval of that.
The third item is the historic sign. The sign that is on the property has been designated a “historic
or significant sign” in the City’s Sign Provisions. Those sign provisions do not indicate what the
long term of that sign should be. Basically, the designation as a historic or significant sign
allowed it to not be considered an abandoned sign meaning it could stay in place even though the
business that it was advertising was not there. For Recommendation 3, Staff is recommending
that the applicant keep, maintain and refurbish this existing sign. They think it has some
advantages that new signage cannot place; both related to size and location and that it is
somewhat fitting with the architectural design of the overall car wash. They think that it could be
refaced and be an asset to their location. In this recommendations section, the Planning
Commission can pick and choose or add others that they may feel are necessary to meet the
objectives of the whole public health, safety and welfare of the project.
Mr. Hugg stated that when the Commission makes their motion on this project, they do need to
address each of those recommendations and include or exclude them specifically from the
7
Page 10
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
recommendation. Otherwise, if they are included they do become a binding condition of the
approval.
Ms. Maucher stated that there is a fourth condition for internal sidewalks.
Mr. Paradee stated that they have no objection to three out of the four suggested conditions. The
one that is problematic for them is moving the building. If you have to move the building back at
all you start to compromise the circulation and the safety of the operation. There is just not
enough room to push the building back in the other direction and at most they would be able to
move it maybe five feet. The point really is, why should you move it at all because the legal
conclusion is that this use is permitted in the SWPOZ (Source Water Protection Overlay Zone).
Whether it’s five feet of the building in it or all of the building in it, it’s permitted. They are
going to minimize it but they simply can’t move the building far enough to move it all the way
out. Their request would respectfully be that they comply with all of the conditions except that
one.
Ms. Maucher questioned the applicant’s position on the sign? Responding to Ms. Maucher, Mr.
Paradee stated that they intend to work with Staff to refurbish the sign. They think it’s a really
neat and cool thing and they would love to see it stay. They will incorporate it into their design
and retain the structure and shape. Their commitment is to work with Staff to make that happen.
Mr. Holt stated that if they are going to keep the sign maybe they can change the name of the car
wash to Kirby and Holloway Car Wash or something that would make more sense and would go
along with the sign that is there now.
Mr. Roach stated that he didn’t know if because they tabled it and brought it, do they give the
opportunity for the public to make comments. Responding to Mr. Roach, Dr. Jones stated no not
tonight. The public hearing on this application was conducted at last month’s meeting so
therefore there is no public hearing tonight.
Ms. Maucher moved to approve S-19-01 Tommy Car Wash at 656 North DuPont Highway and
the requested waiver (Arterial Street Buffer) and with the sign condition and the interior
sidewalk condition, seconded by Mr. Holt and the motion was carried 5-0 with Mr. Adams
recused and Ms. Edwards, Mrs. Welsh and Mr. Tolbert absent. Ms. Maucher voting yes; based
on Staff recommendations and the clarification from the City Planner. Mr. Roach voting yes; due
to the clarification from the City Solicitor saying this wasn’t a use that wasn’t specific to this
actual location. Mr. Holt voting yes; based on the City of Dover. Mr. Baldwin voting yes; based
on Staff recommendations to this application. Dr. Jones voting yes; based on the comments
already made and the clarification on some issues that were unresolved.
Mr. Adams has returned to participate in the meeting.
NEW APPLICATIONS
1) Z-19-04 Lands of Beauregard at 878 South State Street – Public Hearing and Review for
Recommendation to City Council on a rezoning application for a parcel of land totaling
8
Page 11
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
9,600 SF +/- located at 878 South State Street. The property is zoned R-8 (One-Family
Residence Zone). The proposed zoning is C-1 (Neighborhood Commercial Zone). The
property is located on the west side of South State Street, north of Wyoming Avenue and
south of Gooden Avenue. The owners of record are Andre M. and Jane J. Beauregard.
Property Address: 878 South State Street. Tax Parcel: ED-05-077.17-03-51.00-000. Council
District 2. Ordinance #2019-08.
Representatives: Mr. Lance Mears, Hunter Creek Homes
Mrs. Melson-Williams stated that this is a Rezoning application in regards to the property at 878
South State Street. This is located on the west side of South State Street in the block between
Wyoming Avenue and Gooden Avenue. It is a property of 9,600 SF. Currently, there is a one-
story existing building that is located on the property. There is a driveway that leads from South
State Street to the rear of the property where there is a parking area and the property also has
access off a rear alley to that parking area. The current zoning of the property is R-8 (One-
Family Residence Zone) and they are proposing of the property to C-1 (Neighborhood
Commercial Zone). This is an area of South State Street where the zoning is fairly mixed; so for
example, the adjoining property to the north where there is an existing day care facility is zoned
R-8 (One-Family Residence Zone). The building to the south of the subject site is zoned RGO
(General Residence and Office Zone) originally also constructed as a house but has most recently
been utilized as office space which is allowed under the RGO (General Residence and Office
Zone). Across the street we find another multi-tenant office building on lands that are zoned C-
1A (Limited Commercial Zone) and then also the YMCA facility that is zoned IO (Institutional
and Office Zone). The subject site was the subject of the Conditional Use application back in
2008 to establish a church in the building and that was approved by the Planning Commission.
The church was located there for a number of years but then most recently has reverted to a
single-family dwelling.
With any Rezoning, we have to look to the Comprehensive Plan and what that tells us about the
property. The Land Development Plan of the Comprehensive Plan identifies this property as the
Residential Medium Density land use classification and with that land use classification there are
a series of zones that comply with that land use classification. Most of them are very specifically
residential; however, it does include C-1 (Neighborhood Commercial Zone) which this property
is requesting. In the Zoning Ordinance when talking about Neighborhood Commercial Zone,
there are a number of specific uses that are permitted in the zone. They include retail stores,
personal service establishments, service establishments, restaurants and then some residential
uses. There are a number of things that are specifically prohibited, meaning that a property that is
zoned C-1 (Neighborhood Commercial Zone) cannot have the following prohibited uses: fuel
pumps, motor vehicle storage sales or repairs, drive throughs, liquor stores, fire arm sales and
tobacco shops. The other thing that is unique to the C-1 (Neighborhood Commercial Zone) is
that the floor area of any one establishment in that zone is limited to 2,500 SF. Planning Staff is
recommending approval of the Rezoning from R-8 (One-Family Residence Zone) to C-1
(Neighborhood Commercial Zone) as requested. They find that it is consistent with the
Comprehensive Plan for the land use classification. The Comprehensive Plan also talks about the
ability to have small scale commercial in residential areas. This area of South State Street is
adjacent to a number of buildings where residential buildings have been altered to then be used
9
Page 12
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
alternatively as non-residential uses. The DAC Reports from the other agencies basically have no
objections to the Rezoning. A number of them do provide information about should a change of
use be proposed, some advisory notes about how to establish that use appropriately and the
requirements therefore are identified.
Dr. Jones opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Holt moved to recommend approval to City Council for Z-19-04 Lands of Beauregard at 878
South State Street from R-8 to C-1, seconded by Ms. Maucher and the motion was carried 6-0
with Ms. Edwards, Mrs. Welsh and Mr. Tolbert absent. Mr. Adams voting yes. Mr. Roach voting
yes. Mr. Holt voting yes. Mr. Baldwin voting yes. Ms. Maucher voting yes. Dr. Jones voting yes.
2) S-19-02 Boardwalk Apartments at 127, 129, 133, 135 Roosevelt Avenue – Public Hearing
and Review of a Site Development Plan Application to permit construction of a three-story
19,824 SF apartment building consisting of 18 units, four covered parking buildings, and
accompanying site improvements. The previous structures on the sites will be demolished.
The subject area consists three (3) parcels totaling 0.828 +/- acres located on the north side of
Roosevelt Avenue east of North DuPont Highway (US Rt. 13). The property is zoned RG-2
(General Residence Zone). The owner of record is Miller Investments, LLC. Property
Addresses: 127, 129, 133, and 135 Roosevelt Avenue. Tax Parcels: ED-05-077.18-02-71.00-
000, ED-05-077.18-02-72.00-000, and ED-05-077.18-02-73.00-000. Council District 2. For
Consideration: Cash-in-lieu of Active Recreation Area Construction. Project is associated
with variance application V-18-11.
Representatives: Mr. Brendan Diener, Pennoni; Mr. David Miller, owner
Mr. Swierczek stated that this is a review of a Site Development Plan to permit construction of a
three-story apartment building containing eighteen units and four covered parking buildings and
accompanying site improvements. The previous structures on the sites will be demolished. The
subject area currently consists of three parcels totaling 0.828 acres located on the north side of
Roosevelt Avenue east of North DuPont Highway. There are two previous applications of note
related to the sites. In 2018, the applicant for this project submitted to the Planning Office an
application for Rezoning of 127, 129, 133 and 135 Roosevelt Avenue. This was application Z-
18-01. The Rezoning application proposed changing the zoning for these properties from the
then designation of R-8 (One Family Residence Zone) to the new designation of RG-2 (General
Residence Zone). The Planning Commission held a public hearing for the Rezoning application
on September 17, 2018 and recommended the Rezoning to City Council for approval. At their
January 23, 2019 meeting, the Board of Adjustment reviewed application V-18-11 which sought
the following three variances. Number 1 was to exceed the RG-2 (General Residence Zone)
maximum lot coverage of 60% and allow the lot coverage to go up to 65.4%. Number 2 was to
allow the accessory buildings to take up to 38% of the side and rear yards exceeding the typical
limit of 30%. Number 3 was to allow parking within fifteen feet of a wall belonging to a multi-
family dwelling. All three variances were approved by the Board of Adjustment and it is with
these approved Variances that this application is presented to the Planning Commission for
review.
10
Page 13
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
The three parcels containing four buildings addressed as 127, 129, 133 and 135 Roosevelt
Avenue currently contain a mix of one-family and multi-family residences all operated as rental
units. The applicant proposes to increase the number of dwelling units onsite from ten to
eighteen units by demolishing the four existing structures, consolidating the three parcels into
one and then building the new apartment building. The new building would be accompanied by
forty-one onsite parking spaces to meet the minimum parking requirements of the Zoning
Ordinance. Four accessory buildings are also proposed which are intended to turn thirty-one of
the parking spaces into covered parking. The remaining ten parking spaces would be located in
an alcove on the first floor of the apartment thus ensuring that they are also covered by the
building’s second floor. The residential projects are typically required to provide Active
Recreation Area under Zoning Ordinance, Article 5 Section 10.1. Due to the properties size and
unit density, this project qualifies for an Active Recreation Area exemption for small
developments. The Planning Commission will need to determine if the construction of some or
all of the required Active Recreation Area is not practical or desirable and therefore will require
a full or partial cash-in-lieu donation for the portion of the Active Recreation Area determined as
not practical or desirable. Staff recommends that the Commission consider their relatively
limited availability of land on this site when considering if the applicant should proceed with the
cash-in-lieu option as described in Section 7 of the Report. Staff also recommends that some type
of screening should be required in between the parking provided and the neighboring residential
properties. The relatively close proximity of the accessory parking structures to the property lines
may necessitate consideration of increased landscape plantings and/or fencing. It should also be
noted that it appears that there may be existing fencing on adjacent residential properties.
Mr. Diener stated that they do not have any statements at this time.
Mr. Adams stated that his question relates to the large-scale plans that were provided. He is
curious to know and perhaps he just missed it, but he was looking for the easement that they
discussed at the last meeting and wanted to see where the easement went through the property as
demonstrated on these plans. Responding to Mr. Adams, Mr. Swierczek stated that there is a
separate proposal for an apartment building also on Roosevelt Avenue and also by Miller
Investments. These are two separate applications.
Mr. Roach stated that it was stated that they believe there is fencing. Do you know if it is directly
adjacent to the other properties and what type of fencing is it? Responding to Mr. Roach, Mr.
Swierczek stated that it would appear in the plans and also viewing it on Google Maps that there
is fencing on neighboring properties, but it is because of the close proximity of the accessory
garage structures that Staff recommended that.
Mr. Miller stated that they will be making sure that there is fencing for them. They want the site
to be very secure. He talked to Mr. Swierczek about the cash-in-lieu at their meeting. Has Staff
found out any information on the particulars of that? Is that something that they deal with
moving forward after this or is it part of this decision tonight? Responding to Mr. Miller, Mrs.
Melson-Williams stated that dealing with Active Recreation in the City is a little confusing at
times. Residential developments require Active Recreation and there is an area amount per
dwelling unit that must be provided. In certain instances, there are some exemptions and it
11
Page 14
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
appears that this project could qualify for one of the two different exemptions. Depending on
which one you pick is then how the cash-in-lieu is calculated. In one instance, the cash-in-lieu
amount is based on a percentage of the appraised value of the entire property and in another case
the cash-in-lieu amount is based on what a per acre cost would be for the area that you are not
providing. The short answer is tonight what the Planning Commission should be focused on is
should they provide Active Recreation Area or should the cash-in-lieu option be pursed. If the
cash-in-lieu option is to be pursued, then they have to receive from the applicant an appraisal and
that appraisal is utilized to calculate what exactly the amount it. At that time, they can do both
calculations and determine which one may be more appropriate given the property. That cash in
lieu amount will have to be reviewed by the Parks, Recreation and Community Enhancement
Committee as well as back to the Planning Commission to accept the specific dollar amount. The
decision tonight is to either provide Active Recreation Area or provide cash-in-lieu. The amount
of cash-in-lieu is yet to be determined.
Mr. Miller questioned if the permitting process for the building can run sequentially at the same
time that this is happening or does it have to be prior to permitting? Responding to Mr. Miller,
Mrs. Melson-Williams stated that if you are utilizing the cash-in-lieu option, the cash-in-lieu
payment must be made prior to the Building Permit being issued. So as part of the process to
finalize the Site Plan, that is when they would need to be moving through that process to finalize
what the cash-in-lieu amount is and get it back before the appropriate bodies to act on.
Mr. Holt questioned if there is another Active Recreation Area nearby for kids in this area within
a short walking distance of this site? Responding to Mr. Holt, Mrs. Melson-Williams stated that
in the general area there are ways that you could walk to other places that may be considered
Active Recreation Areas but there is not a specific City park in the general vicinity of Roosevelt
Avenue. There are either areas that would involve driving to them or walking on what is a
somewhat noncontiguous pedestrian way to get to trail systems that would then lead you to park
areas.
Mr. Holt stated that he knows that the City has a number of small Active Recreation Parks
around the City, but he just wondered if one of those was in this area.
Mr. Roach questioned how difficult it would be to make it come to fruition if they did not
approve the cash in lieu just for the fact that he has the same question and concern in regards to
that are with the car wash, the Mazda dealership, River Chase, and the project that is going to go
down the street. There is absolutely nothing on that side in regards to activities for kids.
Responding to Mr. Roach, Mr. Miller stated that if he is talking about the financial viability of
the project, it wouldn’t happen.
Dr. Jones opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Roach questioned how close the covered parking garages are on the back side? Are they
right next to each other or is there any space in between each of them when you come around the
whole building? Responding to Mr. Roach, Mr. Miller stated that there are individual buildings
so at the corner there are no buildings and then there are two more.
12
Page 15
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Dr. Jones questioned if the applicant is in agreement with the DAC Report and the
recommendations from Staff? Responding to Dr. Jones, Mr. Diener stated yes.
Ms. Maucher moved to approve S-19-02 Boardwalk Apartments at 127, 129, 133, 135 Roosevelt
Avenue with the cash-in-lieu requirement as well as the screening requirement, seconded by Mr.
Holt and the motion carried 6-0 by roll call vote. Ms. Maucher voting yes; based on Staff
recommendations. Mr. Adams voting yes. Mr. Roach voting yes. Mr. Holt voting yes. Mr.
Baldwin voting yes. Dr. Jones voting yes; based on Staff recommendations.
3) S-19-03 Retail Center at 747 N. DuPont Highway: Master Plan – Public Hearing and
Review of a Site Development Master Plan to permit phased construction of a retail center
to consist of four buildings totaling 62,260 SF in three phases. The buildings proposed
include three retail structures of 19,200 SF, 19,975 SF, and 11,900 SF respectively. There is
also a restaurant of 11,185 SF. The property is zoned SC-2 (Community Shopping Center
Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone). The property is
located on the east side of North DuPont Highway and south of Leipsic Road. The owner
of record is Rojan 15 DD, LLC. Property Address: 747 North DuPont Highway. Tax Parcel:
ED-05-068.05-01-15.01-000. The project also involves reconfiguration of the property and
parking for the hotel located at 764 Dover Leipsic Road. This adjacent property is zoned C-4
(Highway Commercial Zone) and is subject to the SWPOZ (Source Water Protection
Overlay Zone). The owner of record is Delmarva Hotels LLC. Tax Parcel: ED-05-068.05-
01-14.00-000. Council District 3. PLUS #2018-02-02. This site was subject to a Minor
Subdivision Application SB-18-01 as approved by the Planning Commission on February
20, 2018 and granted a one-year extension on February 19, 2019. The Subdivision proposed
dividing the existing parcel of 25.01 +/- acres into two parcels of 10.007 +/- acres and
15.004 +/- acres. This proposal deals exclusively with the 10.007 +/- acre parcel to the
south.
Representatives: Mr. James Taylor Jr., Duffield Associates
Mr. Diaz stated that this project is to create a new shopping center at 747 North DuPont
Highway. This location is sometimes called the old Berry Van Lines site. It’s at the corner of
Dover Leipsic Road and North DuPont Highway. This center would consist of three new retail
buildings and a new restaurant. The center would also connect to an existing hotel that is
adjacent at 764 Dover Leipsic Road through a land swap that would occur between the two
properties. This project has been through several steps to get to where we are now. One of
those has been through State PLUS Review. Just today the applicant submitted responses to the
State comments which were placed on the Commissioner’s desks this evening. They have also
been through a Traffic Impact Study with DelDOT which he has been told that it’s in its final
stages and on its way to approval. It went through a Subdivision Application with the City last
year that is SB-18-01. It was reviewed originally in February 2018 and given an extension
approval in February 2019. This latest step is submission of a Site Development Master Plan
Application. A Site Development Master Plan allows applicants to submit a conceptual plan of
a project for the Planning Commission’s review and approval and then subsequently to submit
13
Page 16
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
detailed plans for individual phases which would undergo administrative review by the
Planning Office. The process gives them an extended timeline for construction of the shopping
center. It is a useful tool to have for large and complex projects. For this project, Phase 1 would
consist of the restaurant, one retail building that is sized 11,900 SF, all of the site entrances and
most of the stormwater management areas identified for the site. Phase 2 would consist of one
more retail building sized 19,975 SF and then Phase 3 would consist of the last retail building
sized 9,200 SF and the last largest stormwater management area which is located to the east of
the center at the top of the plan shown.
There are a few issues that Planning Staff worked on with the applicant during review of this
project. One was the implications of the zoning. The shopping center property is currently
zoned SC-2 (Community Shopping Center Zone) while the hotel is zoned C-4 (Highway
Commercial Zone). The land swap that would occur between the two properties would cause
both properties to become split zoned which has a number of code ramifications which Staff
examined closely to make sure that both properties will remain compliant with the base zoning.
Both properties are also subject to the SWPOZ (Source Water Protection Overlay Zone) which
limits the amount of impervious surface which can be constructed onsite. In the case of the site
Development Master Plan specifically that limit is 75% if the project receives certification from
the City Engineer for Superior Stormwater Infiltration Design. The applicant stated that they
will work with Kent Conservation District and the City’s Public Works Department to pursue
that certification. Another issue that we are working on is the architecture of the new buildings.
Initially, the applicants provided photographs which served as examples of what the buildings
might look like and those are photos of existing buildings in other cities. Since then they have
provided Staff with one rendering of the restaurant building that is specific to this site. It shows
a Golden Corral Restaurant and that is what the building is supposed to look like; however,
they have not seen renderings of the other sides of the building only the front side. They
informed the applicants that they would need to bring the architecture of all of the buildings on
the site to future meetings of the Planning Commission for a detailed review. There are a few
other minor issues that they are working on related to bike parking, dumpsters, landscaping and
making sure that the wastewater from the site can be handled by the nearest City pump station.
They expect to handle all of these issues during the administrative review phase of the project.
They have a couple of Staff recommendations for conditions of approval which are related to
improving the architecture of the complex and also improving the pedestrian facilities onsite.
These are outlined in Section 9 of the Planning Staff portion of the DAC Report. Specifically,
the first recommendation is for architecture. Staff is recommending that the Planning
Commission request that the future architecture submitted for the site be carefully reviewed by
the applicant before submission to make sure that there are no blank walls that would appear on
the building facades. The second one is related to pedestrian facilities. Staff is recommending a
few specific improvements to the onsite pedestrian network that they feel would improve the
walking experience for visitors to the site, in particular the addition of crosswalks and an
additional sidewalk from Dover Leipsic Road. The Commissioners should act on each of these
recommended conditions either including them or not including them in the motion as
necessary.
14
Page 17
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Mr. Taylor stated that they have been working extensively with the Planning Staff and plan to
continue to work with Planning Staff as well as DelDOT and Kent Conservation District to get
all of the approvals necessary in order to develop this property.
Mr. Roach questioned if Mr. Taylor had any issues with the recommendations from the
Planning Staff? Responding to Mr. Roach, Mr. Taylor stated no, the Planning Staff has been
great and they have worked through some of them. They understand the architectural
requirement and at this point in the stage with a Master Plan, you are kind of early on in the
stage of planning. As Mr. Diaz mentioned, the restaurant is proposed to be a Golden Corral
which the architectural shows. The plan is for the remainder of the architecture of the Golden
Corral to look similar to that but they will provide renderings for all four sides of the building
at a later Planning Commission meeting.
Dr. Jones opened a public hearing.
Mr. Matt Groves - PO Box 285 Dover, DE 19903
Mr. Groves stated that he just found out about all of this about a week ago that it was going to
get developed and he had a different idea. He is for the restaurant but what he wanted to do was
have it looked at to make it a drag track to tie in with Dover Downs. He has contacted Dover
Downs but hasn’t heard anything yet and he is going to contact NASCAR and see what they
say.
Dr. Jones stated that they have to consider the application as it is tonight but perhaps he can
engage in conversation later with the concerned parties.
Mr. George Wambold – 885 Dover Leipsic Road Dover, DE 19901
Mr. Wambold stated that he lives almost across from Lot 1 at Dover Downs. He is curious on
how far down the shopping center is going to come towards his house. Responding to Mr.
Wambold, Mr. Taylor stated that the existing hotel is on the top left corner (referring to the plan
visual on the screens.) Right now there is an access drive behind the hotel and the plan is to
improve that.
Mr. Wambold stated that he was under the understanding that they were going to put apartment
buildings in this area. Responding to Mr. Wambold, Mr. Taylor stated that at one point in time
there was the proposal to put apartments there but right now the only thing that is planned for
development is the shopping center.
Mr. Wambold stated that he is all for it.
Dr. Jones closed the public hearing.
Mr. Hugg stated that he would remind the Commission that there are Staff recommended
conditions and they need to be clear as to whether they are including them or not including them
in the motion.
15
Page 18
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Mr. Adams moved to approve S-19-03 Retail Center at 747 N. DuPont Highway: Master Plan as
submitted with the accompanying Staff recommendations, seconded by Mr. Holt and the motion
was carried 6-0 by roll call vote with Ms. Edwards, Mrs. Welsh and Mr. Tolbert absent. Mr.
Adams voting yes. Mr. Roach voting yes. Mr. Holt voting yes. Mr. Baldwin voting yes. Ms.
Maucher voting yes. Dr. Jones voting yes.
NEW BUSINESS
1) Project for Dover’s 2019 Comprehensive Plan
a. Update on Project Activities
b. Review of Preliminary Draft #2A – Goals and Recommendations
Mrs. Melson-Williams stated that the Planning Staff continues to be very busy. They actually
have initial drafts of about five or six chapters. What was included in the packet tonight is what
they call “Preliminary Draft #2A of the Goals and Recommendations. This is the series of Goals
and Recommendations for the main chapters of the plan. Last Spring they started with how do
you like the existing Goals and Recommendations and now they are through drafting what are
the new set of Goals and Recommendations. They are providing them to the Commission for the
initial review. They would like to hear and comments or feedback on them. You do not have to
take specific action this evening on them; they just wanted to keep you in the loop of what is
going on. With these in fairly good shape, they are moving to working on the text of the various
chapters and delving back into the series of maps that also must accompany the Comprehensive
Plan. Good news for them is that last week they received the extension of the timeframe needed
to complete the Comprehensive Plan. The current Comprehensive Plan was set to expire in early
February. The State Cabinet Committee on State Planning Issues formally granted the extension
at their meeting last week. They had actually asked for the extension back in the Fall. This is
continued work on the Comprehensive Plan. If you have thoughts please visit the City’s website
that they have dedicated to the Comprehensive Plan so that you can see the most recent
information that they have posted. They will be in the next week, posting this information for the
public to start reviewing and to remind them that they are doing a Comprehensive Plan since it’s
been a while since we had an Open House in August 2018. The other thing that they have been
doing is meeting with their adjacent jurisdictions. They met with Kent County, the Towns of
Camden, Little Creek as well as Cheswold and they are still trying to get the meeting lined up
with the Town of Wyoming. They continue to make progress and certainly within the next few
months they will be seeing what will be the draft document to begin the formal review process
for it.
Meeting adjourned at 8:33 PM.
Sincerely,
Kristen Mullaney
16
Page 19
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2019
Secretary
17
Page 20
The Institute for Public Administration presents
Introduction to Real Estate Development
for Local Government Officials
COURSE INSTRUCTOR COURSE INSTRUCTOR
Paul Bryant Sean O’Neill, AICP
Founding Partner Policy Scientist, IPA
SB Real Estate University of Delaware
This new IPA training course will introduce the real
estate development process from the perspective of
may 3, 2019 the real estate professional. Attendees will learn the ins
and outs of what it takes to get development projects
designed, funded, built, and completed. This course will
9:00 a.m. to NOON
Check-in begins at 8:30 a.m.
give local government officials a better understanding
of their role in the development process and how land
use decisions and regulations can guide the growth of
their communities in the future.
The Duncan Center
500 Loockerman Street, Dover, DE 19904 Course topics will include:
• The Real Estate Development Project Lifecycle
$55 Registration Fee • Market Research
Includes refreshments • Site Selection
Registration Deadline
May 2, 2019 • Real Estate Financing
• Asset Management
Register online • The Role of the Public Sector
www.bidenschool.udel.edu/ This session qualifies for certificate credit in the
Academy for Excellence in Local Government
ipa/events/upcoming Leadership.
Page 21
City of Dover
DATA SHEET FOR MINOR SUBDIVISION PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF April 3, 2019
PLANNING COMMISSION MEETING OF April 15, 2019
Plan Title: Minor Subdivision Plan for Kraft Foods Group, Inc, SB-19-01
Plan Type: Minor Subdivision Plan
Applicant/Owner: General Foods Corp. (Kraft Foods Group, Inc.)
Property Location: South side of West North Street and west of POW-MIA Parkway
Property Address: 1250 W. North Street, Dover DE
Tax Parcels: ED-05-076.00-01-12.00-000
ED-05-076.00-01-10.00-000
Existing Site Area: 105.6689 acres +/-
Parcels to be Created: Lot 1: 16.3949 acres +/-
Residual: 89.2740 acres +/-
Zoning: IPM (Industrial Park Manufacturing Zone)
Current Use: Manufacturing facility (food products)
Sewer & Water: City of Dover
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 22
City of
Dover
CITY OF DOVER
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: April 3, 2019
APPLICATION: Minor Subdivision Plan for Lands of Kraft Foods Group Inc. at 1250 W. North
Street
FILE #: SB-19-01 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP, Principal Planner
PHONE #: (302) 736-7196
I. PLAN SUMMARY:
This application is the Review of a Minor Subdivision Plan to permit subdivision of 105.6689
+/- acres of land into the new Lot 1 of 16.3949 acres and the Residual of 89.2740 acres. The
property is located on the south side of West North Street and west of POW-MIA Parkway. The
property is zoned IPM (Industrial Park Manufacturing Zone). The owner of record is General
Foods Corp. (Kraft Foods Group, Inc.) Property Address: 1250 West North Street. Tax Parcels:
ED-05-076.00-01-12.00-000 and ED-05-076.00-01-10.00-000. Council District 2.
Existing Property
The property is the site of the Kraft Heinz manufacturing facility. The development of the food
production facility began in the 1960s and includes a rail-line spur that approaches the main
building from the south. Access to the site is from West North Street with parking and truck
parking areas in the northeast portion of the site. With the recent development of the POW-MIA
Parkway (West Dover Connector project), the location now has street frontage along the
Parkway. The site is enclosed by fencing (chain-link).
II. PROJECT DESCRIPTION
This Minor Subdivision Plan proposes to subdivide the property into (2) separate parcels. See the
following Table for summary of the parcels.
Proposed
Site Building Area
Acreage
Lot 1 Open Area 16.3946 acres
Existing
Residual (portions of two parcels) Building & Site 89.2740 acres
Improvements
Total 105.6689 acres
Lot 1 is the new parcel being created by subdivision an existing unimproved area of the property
Page 23
SB-19-01 Minor Subdivision Plan for Lands of Kraft Foods Group Inc.
DAC Report of April 3, 2019
Page 2
on the southeast side of the facility site. This large open area has frontage on the POW-MIA
Parkway; however, no specific access point has been determined. The remaining land area (the
Residual) is the existing location of the manufacturing building, vehicle and truck parking areas,
and a rail-line spur (railroad track).
III. ZONING REVIEW
IPM Zoning District
The property is zoned IPM (Industrial Park Manufacturing Zone) and is subject to the regulations
of Zoning Ordinance, Article 3 §20 and Article 4 §4.16 as a conventional individual lot
development. The following table highlights some of the lot design standards for the IPM Zone:
Minimum Required IPM
(Conventional
Planned)
For All Permitted Uses:
Lot Area 2 1/2 acres
Lot width (ft.) 200
Lot depth (ft.) 300
Front Yard 60
Side yard (ft.) 40
Rear yard (ft.) 40
Side or rear yard which adjoins a residential zone (ft.) 100
Off-street parking space:
Per 800 sq. ft. of floor area 1
Per employee, per largest working shift (if greater than the requirement under
the floor area calculation 1
Maximum Permitted
Building Height:
Stories Not limit
Feet Equal to distance to
nearest lot line
Floor Area Ratio 0.5
Lot Coverage 75%
The proposed subdivision appears to comply with the IPM bulk standards of Article 4 §4.16 as
outlined for the existing development (buildings). Site compliance with the IPM parking
requirements could not be confirmed. Any future development of Lot 1 will be subject to these
bulk standards.
As part of the review process, Planning Staff made a determination regarding the question of the
bulk standard requirements for height. See the following statement from email of 2/28/2019:
Thank you for the additional information about the existing building height. The following
determination addresses the question of the bulk standard requirement for height:
For the IPM zone, in Zoning Ordinance, Article 4 Section 4.16 (the bulk standards) list the
maximum permitted Building Height as “Not limited” for the number of stories and as “Equal to
distance to nearest lot line.” Thus, the Building Height is limited to the proximity (distance) to
the lot lines. The Zoning Ordinance, Article 12 defines Height: The vertical distance measured
Page 24
SB-19-01 Minor Subdivision Plan for Lands of Kraft Foods Group Inc.
DAC Report of April 3, 2019
Page 3
from the average elevation of the finished grade at the front of the building to the highest point
of the roof for flat and mansard roofs and to the mean height between [the] eave and ridge for
other types of roofs.
The Code does not provide guidance on how to specifically address Building Height when a
Building has multiple roof heights for different sections of the building. Planning Staff has
determined that the Building Height is limited by the distance of the specific building
element/section to the lot line (property line). For example, a tower element being taller than
the general building would require that the height of the tower is limited to the tower’s distance
from the property line and the general building is limited in height to the distance the general
building is from the property line.
For the proposed project described below, it appears that the conceptual plan to create a new
property line approximately 84 feet from the east side of the existing building would be in
compliance (per our determination above). The taller tower-like sections of the building comply
in Height to the distance of the element from the property line. Please include the height
information and distance measurements gathered in the application/plan submission.
V. SITE CONSIDERATIONS
Site Access
The Residual parcel includes the existing main entrance/exit and a secondary access to West
North Street. It has no access onto the POW-MIA Parkway. There are no existing access points
to the POW-MIA Parkway for Lot 1.
Parking/ Bicycle Parking
The minimum parking requirements for the existing facility are based on floor area or on an
employee count of the largest shift. The Zoning Ordinance also requires minimum bicycle
parking of one (1) bike space for every twenty (20) parking spaces. The facility was originally
construction under different code requirements and may be non-conforming. The existing
property also includes several parking areas devoted to truck parking and loading facilities which
comply with the loading berth requirements. A detail parking space count of vehicle and bicycle
parking was not provided.
Sidewalks & Pathways
According to Zoning Ordinance, Article 5 §18, sidewalks or other pathways required along all
street frontages of the properties with certain types of development reviews; however, a Minor
Subdivision Plan submission is a type that does not require construction of sidewalks/pathways.
The subject site includes an existing multi-use pathway along the West North Street frontage and
a ten-foot width paved path along a portion of the POW/MIA Parkway frontage.
Landscaping and Tree Planting
Landscaping requirements are subject principally to the regulations found in Zoning Ordinance,
Article 5 Sections 15 and 16 and are also addressed in other various sections of code related to
buffering, screening, and open space. There are existing tree plantings and woodland areas on the
Residual parcels. The future development activity on Lot 1 will be subject to these provisions.
Flood Hazard Areas/Wetland Areas
The Zoning Ordinance, Article 5 §11 includes limitations on development in Flood Hazard
Page 25
SB-19-01 Minor Subdivision Plan for Lands of Kraft Foods Group Inc.
DAC Report of April 3, 2019
Page 4
Areas (100-year floodplains) and in/and near Wetland Areas. In the southwest areas of the
Residual (parcels) are impacted by the Flood Hazard Area and a wetland area. The new Lot 1 is
not impacted by these areas.
VI. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with this agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Sheet 1:
a. Update number of existing lots to be two (2) and the total number proposed to (3) if
Residual is to remain as two tax parcels. This accounts for the separate parcel that
exists along the western property line. However, as part of this Plan this second parcel
(parcel 10.00) can be combined into the Residual (parcel 12.00).
b. Update Item #13 – Bulk Standards to the IPM requirements for a conventional lot
development. Currently, listed are the provisions for a Planned Industrial Park: this is
not a Planned Industrial Park.
2) Provide any available information on counts of vehicle and bicycle parking spaces.
3) Any existing easements recorded should be shown on the plan along with any new easements
that are currently proposed with this subdivision. Ensure plan notes or labels with the
easements provide their reference sources.
4) The formal Record Plan will need to be recorded upon completion of the approval process
with any corrections identified by the reviewing agencies.
5) The Final Record Plat submitted must include requirements described in Dover Code of
Ordinances, Appendix A: Land Subdivision Regulations, Article IV, C. Plat.
VII. RECOMMENDED ADDITIONAL CONSIDERATIONS TO MEET CODE
OBJECTIVES:
The Land Subdivision Regulations, Article I. Purpose, indicates that the regulations are adopted
in order to promote and protect the public health, safety, convenience and general welfare;
ensure the orderly growth and development of the City, the conservation, protection and proper
use of land, and adequate provision for housing, recreation, circulation, utilities and services; and
safeguard the City from undue future expenditure for the maintenance of streets and public
spaces. Similar safeguards are also in the expressed intent of the Zoning Ordinance, and in the
Site Development Plan objectives listed in subsections Article 10 §2.21 to 2.28.
1) This Minor Subdivision Plan creates a new parcel with a Residual (two parcels); the areas
remain zoned IPM. The Subdivision Plan complies with the Land Subdivision Regulations.
Other agencies may recommend additional conditions and safeguards in accordance with their
areas of expertise. The Recommended Additional Considerations to Meet Code Objectives are
offered for consideration by the Planning Commission.
Page 26
SB-19-01 Minor Subdivision Plan for Lands of Kraft Foods Group Inc.
DAC Report of April 3, 2019
Page 5
VII. ADVISORY COMMENTS TO THE APPLICANT:
1) In the event, that major changes and revisions to the Minor Subdivision Plan occur in the
finalization of the Plan contact the Planning Office. These changes may require resubmittal
for review by the Development Advisory Committee, Planning Commission, or other
agencies and commissions making recommendations in regards to the plan.
2) Following Planning Commission approval of the Minor Subdivision Plan, the Plan must be
revised to meet all conditions of approval from the Development Advisory Committee or as
otherwise noted. A Check Print must be submitted for review by Planning Office Staff. Upon
determination that the Plan is complete and all agency approvals have been received, copies
of the Plan may be submitted for final endorsement prior to recordation at the Kent County
Recorder of Deeds Office.
3) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
4) The engineer or surveyor signing and certifying the Plan is required to have a City of Dover
Business License. Contact the Permitting & Licensing Section at 736-7010 for more
information.
5) The applicant shall be aware that Minor Subdivision Plan approval does not represent a Sign
Permit, nor does it convey permission to place any sign on the premises. Any proposed site
or building identification sign may require a Sign Permit from the City of Dover prior to
placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
6) The applicant shall be aware that Minor Subdivision Plan approval does not represent a
Building Permit and associated construction activity permits. A separate application process
is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 27
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 27, 2019
APPLICATION: Minor Subdivision Plan Lands of Kraft Foods
Group Inc. at 1250 W. North Street
FILE #: SB-19-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 28
Minor Subdivision Plan Lands of Kraft Foods Group Inc. at 1250 W. North Street
File #: SB-19-01
March 29, 2019
Page 2 of 2
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. No objection to the subdivision of this property.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / GROUNDS / GENERAL / STREETS / SANITATION
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. Easements may need to be completed again due to parcel ID changes from this application.
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Each property shall be served by a single water service line which shall be furnished and installed by the property
owner when developed.
3. Hydrant flow testing is currently only performed two (2) times per year during system wide flushing operations. The
applicant must call the Department of Public Works directly to schedule these tests. This applies to both existing
hydrants as well as those proposed for the site.
4. Impact fees may be required for this project when developed. It is the responsibility of the applicant to provide
documentation that there were existing dwellings on this site connected to the City’s sanitary sewer and water system.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Each property shall be served by a single sanitary sewer lateral which shall be furnished and installed by the property
owner when developed.
3. Impact fees may be required for this project when developed. It is the responsibility of the applicant to provide
documentation that there were pervious dwellings existing on this site connected to the City’s sanitary sewer and
water system.
STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 29
C F
SB-19-01 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 03/27/19 D S
O H
V A
E L
R
APPLICATION: Minor Subdivision Plan Lands of Kraft Group Inc. at 1250 W North St
FILE #: SB-19-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposal: Minor subdivision (Lot 1 16.39 acres and Residual 89.27 acres, Food Production Plant
to manufacturing) This office has no objections.
2. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four
inches in height, location, the number shall be placed on the house above or to the left or right of
the front entrance, color, the number shall be contrasting to the background color, Arabic numerals,
all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings
with apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, color, numbers shall
be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic
numerals.
Page 30
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the
street end of the building so as to be visible from either the public or private street or from the
parking lot,
property line or driveway, should the building be located far enough from a public or private road so
that the numbers are not clearly visible from the street, then the street address shall also be
posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on
each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
3. Project to be completed per approved Site Plan.
4. Full building and fire plan review is required.
5. Separate building permits/plans submission will be required for each building and/or tenant fit
out. If the permit submission is for a “shell” a Certificate of Occupancy will not be issued.
Separate plans and permits submissions will be required for each “tenant fit out” at which time a
Certificate of Occupancy will be issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for
the “shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.
6. Construction or renovations cannot be started until building plans are approved.
7. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire Marshal’s Office. This work cannot be started until the permit is approved.
8. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 31
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 27, 2019 T
===============================================================
APPLICATION: Kraft Food Group, Inc. (1250 W. North Street)
FILE#: SB-19-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Joshua Schwartz PHONE#: 302-760-2768
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. The parcel will be required to obtain a Letter of No Objection for the Site/Record Plan and Entrance
Plan approval from DelDOT for the proposed development.
2. The developer and the engineer shall submit a pre-submittal meeting request through the PDCA to
begin the plan review process.
Page 32
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
APRIL 2019
APPLICATION: Kraft Foods Group Inc. at 1250 W. North St FILE #: SB-19-01
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Jessica L. Verchick, EIT PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE
FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE
APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. Kent Conservation District has no objection to the minor subdivision of the above referenced site.
ADVISORY COMMENTS TO THE APPLICANT:
1. A detailed Sediment and Stormwater Management Plan must be approved by our office prior to any land
disturbing activity (i.e. clearing, grading, filling, etc.) over 5000 square feet.
2. This site is located within the Puncheon Run watershed. It will require overmanagement of stormwater on
the site.
Page 33
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF April 3, 2019
PLANNING COMMISSION MEETING OF April 15, 2019
Plan Title: Retail Facility, S-19-07
Plan Type: Site Development Plan
Location: East side of South DuPont Highway south of Cowgill Street and north
of Public Safety Boulevard
Address: 515 South DuPont Highway
Tax Parcel: ED-05-077.00-01-12.00-000
Owner/Applicant: Kent Del Properties, LLC
Site Area: 0.91 acres +/-
Zoning: C-4 (Highway Commercial Zone)
Present Use: Vacant parcel
Proposed Use: Retail building
Building Area: 8,050 SF
Parking Required: 27 spaces
Parking Proposed: 32 spaces
Sewer & Water: City of Dover
Waivers Requested: Reduction of Arterial Street Buffer
Elimination of Loading Space Requirement
Fencing Component of the Opaque Barrier Requirement
Page 34
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 2
City of
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: April 3, 2019
APPLICATION: Retail Facility at 515 South DuPont Highway
FILE #: S-19-07 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Julian Swierczek, Planner I PHONE #: (302) 736-7196
I. PLAN SUMMARY
Review of a Site Development Plan Application to permit construction of a one-story 8,050 SF
retail building and accompanying site improvements. The site is currently vacant. The subject
area is 0.91 +/- acres located on the east side of South DuPont Highway south of Cowgill Street
and north of Public Safety Boulevard. The property is zoned C-4 (Highway Commercial Zone).
The owner of record is Kent Del Properties, LLC. Property Address: 515 South DuPont
Highway. Tax Parcel: ED-05-077.00-01-12.00-000. Council District 2.
Previous Applications
In March 2008, the Planning Commission granted conditional approval of a Site Development
Plan for the construction of an office building (Application #S-08-08) on this property. The
application was originally heard at the February 2008 meeting of the Planning Commission, but
was tabled so that the applicant could address concerns as to the orientation and overall
architecture of the proposed building. The project was revised, and it is this revised application
that the Commission conditionally approved. The plan never achieved Final Plan approval and
has since expired.
II. PROJECT DESCRIPTION
The Site Development Plan shows one main structure to be utilized as a Retail Building, along
with associated site improvements. The property is located on the east side of South DuPont
Highway. The properties along both sides of South DuPont Highway to the north and south are
all zoned C-4 (Highway Commercial Zone) as well. The property immediately adjacent to the
north is a motor vehicle service facility. Immediately adjacent to the south (the parcel from
which this parcel will be accessed) is a lumber warehouse and retail facility. Across South
DuPont Highway to the west are located the Delaware Division of Public Health Offices and a
restaurant. The northeast corner of the subject property abuts a small residential area of
predominately single family residences zoned RG-1 (General Residence Zone).
The applicant has submitted a letter describing their requests for three waivers. The first is a
Waiver Request from Article 5 Section 7.33 for the Arterial Street Buffer Requirements, asking
that they be permitted a 0 ft. Arterial Street Buffer along South DuPont Highway, whereas Code
Page 35
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 3
requires a minimum 30 foot Arterial Street Buffer. The second Waiver Request asked for by the
applicant is to establish no loading berths on-site, whereas Article 6 Section 4.24 requires that a
retail building of 8,000 – 25,000 SF provide a minimum of one (1) loading berth. Finally, the
applicant is requesting a waiver from the requirements of Article 5 Section 7.2 pertaining to the
fence component of the Opaque Barrier requirements.
III. ZONING REVIEW
C-4 (Highway Commercial Zone) and Lot & Bulk Standards
The development site is zoned C-4 (Highway Commercial Zone) and is subject to the regulations
of Zoning Ordinance, Article 3 §16 and Article 4 §4.15. Retail is a permitted use in the C-4
Zoning District. The proposed development meets the setback and Lot Coverage requirements of
the C-4 zone; the C-4 zone has a maximum lot coverage of 75%. The standards for C-4,
compared with the project proposal, are listed below:
Table 1: Required and Proposed Bulk Standards
C-4 (Highway Commercial
Applicant's Project
Zone)
Lot area - 0.91 acres (39,523 SF)
Lot width (ft.) 150 158.66
Lot depth (ft.) 150 250
Front yard (ft.) 20 75.1
Side yard (ft.) 15 15
Rear yard (ft.) 10 or equal to bldg. height 91.4
Side or rear yards which adjoin a 30
91.4
Residence zone (ft.)
Off-street parking spaces
Per 300 sq. ft. floor area or 1 27
Per employee (whichever is greater) 1 N/A
Stories 6 1
Lot Coverage 75% 74.4%
IV. PARKING SUMMARY
Off-street parking in the C-4 zone (as noted above in Table 1) must be provided at a rate of one
(1) space per 300 SF of floor area or one (1) space per employee, whichever is greater. As the
number of employees is not yet determined, this would place the requirement for parking spaces
for the 8,050 SF building at twenty-seven (27) spaces. The applicant is proposing thirty-two (32)
parking spaces.
Waiver Request: Loading Spaces
For buildings with retail sales of at least 8,000 SF to 25,000 SF, one loading berth is required.
For this project with a total building area of 8,050 SF, the requirement is one (1) loading berths.
The plans submitted by the applicant show that no loading berths are proposed for this building.
In accordance with the Zoning Ordinance, Article 6 §4.4, the applicant has submitted a written
waiver request from the requirements for loading facilities for consideration by the Planning
Page 36
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 4
Commission.
Bicycle Parking
Bicycle parking is required at a ratio of one (1) space for every twenty (20) parking spaces.
Based on the proposed (32) regular spaces, two (2) bicycle parking spaces must be provided. The
plan indicates that two (2) bicycle spaces will be provided on the west side of the retail building.
V. SITE CONSIDERATIONS
Site Entrance
No new access is proposed to South DuPont Highway but rather use of a shared access easement
is noted with the existing entrance at the southwest corner. The entrance is to be shared with the
neighboring 84 Lumber property. The applicant is showing that a single drive aisle is proposed.
It is full access and circles around the building to the north to access the rear parking and
dumpsters at the eastern end of the site.
Pedestrian Considerations
The site is currently served by an existing frontage sidewalk along South DuPont Highway. The
Applicant is proposing a new sidewalk to run from South DuPont Highway into the site, providing
connected access to the building.
Lighting
Article 5 §7.1 stipulates that lighting shall provide no less than 1.5 footcandles at grade. Light
shall also be deflected away from adjacent residential areas and shall not be distracting to traffic
on adjacent roads. The plans indicate that lighting is planned for the exterior of the building from
four (4) light posts, two (2) at the front (west) of the building, and two (2) at the rear (east).
Curbing
The upright curbing for the parking lots and drive aisles are subject to the requirements of Article
6 Section 3.6(b) of the Zoning Ordinance. This curb type appears to be utilized throughout the
site layout.
Dumpsters
The plan identifies a location for two (2) dumpster pads but does not indicate the number of
dumpster units to be provided or the type of enclosure to be built. Article 5 Section 6.12 requires
that a retail building of less than 50,000 SF provide a minimum of two (2) dumpsters for the first
16,000 SF of gross floor area, and one (1) additional dumpster for each additional 16,000 SF of
gross floor area thereafter. As the building is proposed to be 8,050 SF a minimum of two (2)
dumpster units will need to be provided.
A Dumpster enclosure is required to screen the dumpster from view whenever these units are
situated so that they will be visible from any public right-of-way or from an adjacent property, as
identified in Article 5 Section 6.11. No details for any such enclosure for either dumpster pad is
provided.
Page 37
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 5
Signage
A separate Sign Permit application is required to be submitted for review prior to the installation
of signage on the property pertaining to the building/site.
VI. BUILDING ARCHITECTURE
The applicant has submitted some architectural information for the building in the forms of one
elevation drawing and one rendering. The Retail Facility is one-story in height and topped by a
flat roof. The front (west) elevation seems to indicate the capacity for up to six (6) retail spaces,
each with their own entrance. The façade appears to be a combination of materials, with a red
brick watertable running along the bottom, and being utilized in six pillar-like vertical elements.
The doors and windows are surrounded by a grey siding and capped by six (6) individual red
awnings spanning each storefront. Above the awnings, in the place where the signs would be
located, is a vertical beige siding. The specific materials of the siding are not identified. The
north and south elevations are similarly composed of the red brick watertable at the bottom, with
the grey horizontal siding above, and capped with the beige vertical siding at the top. The side
(north and south) wall elevations do not contain any windows, doors or similar features, but are
left blank.
VII. TREE PLANTING AND LANDSCAPE PLAN
The submitted plan set includes a concept for the Landscaping Plan. The total lot area is 39,523
SF; based on this area, fourteen (14) trees are required to meet the tree density requirements of
the site. The applicant currently is showing that twelve (12) trees including three (3) Village
Green Zelkovas at the front and rear of the site, as well as nine (9) Armstrong Red Maples along
the southern edge of the property. The applicant has indicated that there are fifty-nine (59) “plant
units” proposed, but only twelve (12) are identified as trees, the remainder being a mixture of
shrubs and grasses.
Waiver Request: Arterial Street Buffer
South DuPont Highway (U.S. Route 13) is considered as a principal arterial street and requires a
thirty (30) foot landscape buffer along the road frontage known as an Arterial Street Buffer. The
buffer is measured from the edge of the right-of-way. This plan does not provide the required
thirty (30) foot wide landscape buffer along DuPont Highway; the proposed parking is
immediately adjacent to the right-of-way along DuPont Highway. In accordance with the Zoning
Ordinance, Article 5 §7.33, the applicant has submitted a written waiver request from the
requirements of the Arterial Street Buffer for consideration of the Planning Commission.
Waiver Request: Opaque Barrier – Fence Component
The Zoning Ordinance requires a buffer between a residential use and a non-residential use
(Article 5 Section 7.2). The buffer has two components: an opaque barrier consisting of a
wooden fence, a masonry wall or an earthen berm and a landscape component. For this project,
a buffer is required along a segment of the northeast property line of the parcel. The plan
currently does not show either component of the opaque barrier requirement. The applicant has
submitted a written waiver request from the fencing component of the Opaque Barrier
requirements for the consideration of the Planning Commission.
Page 38
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 6
IX. CITY AND STATE CODE REQUIREMENTS
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with this agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) The loading space requirement shall be complied with unless a waiver is granted by the
Planning Commission for the elimination of the loading space. A written waiver request was
submitted for consideration by the Planning Commission.
2) An Arterial Street Buffer shall be provided in accordance with the Zoning Ordinance unless a
waiver is granted by the Planning Commission. A written waiver request was submitted for a
reduction in the Arterial Street Buffer to be considered by the Planning Commission.
3) An Opaque Barrier shall be provided in accordance with the provisions of the Zoning
Ordinance as described in Article 5 Section 7. The Planning Commission may only waive
the opaque barrier (fence, wall or berm) portion of the buffer; the continuous 6-foot-tall
landscape component shall be planted along all residential boundaries. A written waiver
request was submitted by the applicant for review by the Planning Commission.
4) Planning Staff is concerned about the site layout and the potential implications on design
related to the Arterial Street Buffer, fire protection requirements, and stormwater
management compliance.
5) Sheet C-001/Cover Sheet:
a. Please include tree density calculations.
b. Please change the tax parcel number to read: ED-05-077.00-01-12.00-000
c. Please note the width of South DuPont Highway.
d. Please include the Floor Area Ratio calculation.
e. Please include the title of the signee.
6) Sheet C-201/Site Development Plan
a. Please note the width of the green space provided between the Right of Way and the
parking lot.
b. Please include details as to the direction, power and time of use for the proposed outdoor
lighting
c. Please include further detail as to the placement and number of dumpster units to be
provided.
d. Please include details of the dumpster enclosure, noting the height and material.
e. Please include details of the Opaque Barrier requirement along the neighboring
residential properties.
7) Sheet L-101/Landscape and Lighting Plan:
a. Please include the Developer’s name, address and telephone number
b. Please note that the requirement in Code is not for “Plant Units” but for “Trees,” so it
should be corrected to read “Trees” Provided, and not “Plant Units” provided. Please also
correct the count accordingly as 14 trees are required, and currently only 12 are shown.
Page 39
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 7
c. Please note the total acreage of the site.
d. Ensure tree plantings do not conflict with Utility lines (underground or overhead line).
e. Please show the fencing and landscaping as required for the Opaque Barrier along the
residential properties.
f. Please ensure that the entry/exit of the two parking spaces at the rear southeastern corner
of the park lot (one facing south, one facing east) do not conflict with one another.
8) Ensure project design continues to comply with maximum impervious lot coverage limit of
75%. Design changes to meet agency requirements may impact impervious lot coverage.
X. RECOMMENDED ADDITIONAL CONSIDERATIONS TO MEET CODE OBJECTIVES
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Waiver Request – Elimination of Loading Spaces: In accordance with Article 6 Section 4.23
related to loading berths required, Staff recommends approval of the request to eliminate the
loading space requirement for the retail building. Staff acknowledges that the proposed
square footage is just 50 SF over the minimum requirement to provide a loading berth and
concurs that the rear parking area would be sufficient for loading activities. Large vehicles
(tractor trailers) would not be anticipated to need access for delivery of goods to the site.
2) Waiver Request – Arterial Street Buffer: In accordance with subsection 2.25 related to
landscaping, Planning Staff suggests that the Planning Commission consider a partial waiver
from the requirements of the Arterial Street Buffer. The applicant should provide landscaping
in place of some of the parking spaces at the front of the proposed parking lot, nearest to
South DuPont Highway. As the applicant is providing thirty-two (32) parking spaces, which
is five (5) more than the required twenty-seven (27), staff believes that some enhanced
landscaping can be provided at the front of the building, without requiring the full buffer to
be provided for the entire width of the parcel along the south DuPont Highway frontage. The
expansion of existing proposed islands or additional islands with trees/plantings will help to
fill the requirements of the Arterial Street Buffer. Staff notes that neighboring properties have
limited buffer areas on their properties and likely rely on the grass area within the right-of-
way.
3) Waiver Request – Fencing Component of the Opaque Barrier: In accordance with Article 5
Section 7, regarding the Opaque Barrier Requirements, Staff recommends approval of the
request to eliminate the fence component. Staff concurs with the assessment of the applicant
in that landscaping would be a desirable alternative for this segment of the rear property line.
4) Architecture: To further subsection 2.28 related to architectural characteristics of proposed
buildings, Staff recommends that the southern and northern elevations include some of the
Page 40
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 8
architectural features of the front (western) elevation. The inclusion of some vertical
elements to break the horizontal features, like including the red brick pillars found on the
front façade or simulated window elements, would help to increase the visual appeal. This
would be particularly true of the southern elevation which is highly visible from South
DuPont Highway and the neighboring properties.
Other agencies may recommend additional considerations to meet code objectives in accordance
with their areas of expertise. Action on all considerations identified in this section and by other
agencies is at the discretion of the Planning Commission.
XI. ADVISORY COMMENTS TO THE APPLICANT
1) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers
are at the discretion of the Planning Commission. The Commission may approve or deny
waiver requests.
2) In the event that major changes and revisions to the Site Development Plan occur in the
finalization of the Plan, contact the Planning Office. Examples include reorientation of
the complex/buildings, relocation of site components like stormwater management areas
and site entrances, and increases in floor area. These changes may require resubmittal for
review by the Development Advisory Committee, Planning Commission, or other
agencies and commissions making recommendations in regards to the plan.
3) In the event that there are changes to the architecture, building footprints, layout or
square footage of the building contact the Planning Office. These changes may require
review by the Planning Commission.
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) Following Planning Commission approval of the Site Development Plan, the Plan must
be revised to meet all conditions of approval from the Development Advisory Committee
or as otherwise noted.
6) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, parking requirements, etc.
7) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections
and permits are required.
Page 41
S-19-07 Retail Facility at 515 South DuPont Highway
DAC Report of April 3, 2019
Page 9
8) Construction may have an effect on the adjacent property owners. Any work requiring
the closing or rerouting of residents or visitors should be coordinated as to offer the least
amount of inconvenience.
9) The applicant shall be aware that Site Plan approval does not represent a Building Permit,
Demolition Permits, and associated construction activity permits. A separate application
process is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 42
Duffield Associates, Inc.
5400 Limestone Road
Wilmington, DE 19808
Phone: 302.239.6634
Fax: 302.239.8485
duffnet.com
April 4, 2019
Via Email
Ms. Dawn E. Melson-Williams, AICP
Principal Planner
City of Dover
15 Loockerman Plaza
Dover, DE 19901
RE: Project No. 12000.CA (Duffield)
Waiver Request – 515 S. Dupont Highway
Tax Parcel No. 2-05-077.00-01-12.00-00001
Dover, Kent County, DE
Dear Ms. Melson-Williams:
Duffield Associates, Inc. (Duffield) is pleased to submit our Waiver Request associated with the
Site Development Plan for 515 South DuPont Highway. We are hereby requesting the following
waivers be granted by the Planning Commission:
Loading Spaces
For buildings with retail sales of at least 8,000 SF to 25,000 SF, one loading berth is required per
Article 6 Section 4.23 of the Zoning Code. For this project with a total building area of 8,050 SF,
the requirement is one (1) loading berths.
We are requesting that the Planning Commission grant a waiver from the loading berth for the
following reasons:
1) The square footage is slightly over the 8,000 sf for requirement.
2) It is intended that deliveries would be made at the rear of the building in the drive aisle.
Thirty feet has been provided for the drive aisle compared to the typical twenty-four feet.
The additional 6 feet should allow for vehicles not to be blocked in the parking lot.
3) It is not anticipated that large vehicles will be accessing the site (due to the size of the
property). Deliveries should be made by box trucks vs. tractor trailers.
Arterial Street Buffer
South DuPont Highway (U.S Route 13) is considered as a principal arterial street and requires a thirty
(30) foot landscape buffer along the road frontage known as an Arterial Street Buffer according to
Article 5 Section 7.3 of the Zoning Code.
Enhancing our community one project at a time.
Page 43
Ms. Dawn E. Melson-Williams
RE: Project No. 12000.CA (Duffield)
515 S. DuPont Highway (App #S-19-07)
April 4, 2019
Page 2
We are requesting that the Planning Commission grant the waiver to eliminate the thirty (30) foot
landscape buffer for the following reasons as listed in Article 5 Section 7.33 of the Zoning Code:
1) The site is only 1 acre in size. For a small sized lot, to enforce a 30 foot landscape buffer
would reduce the buildable area and could make the project unfeasible.
2) The surround properties have parking directly adjacent to the right-of-way. By providing the
required buffer or any buffer along the frontage, it would be inconsistent with the surrounding
built environment.
3) Between the arterial street and the property line is 39 feet, which can contribute to the buffer.
Opaque Barrier
The City of Dover Zoning Code requires a buffer between a residential use and a non-residential use
(Article 5 Section 7.2). The buffer has two components: an opaque barrier consisting of a wooden
fence, a masonry wall or an earthen berm and a landscape component. For this project, a buffer is
required along a segment of the northeast property line of the parcel. The plan currently does not
show either component of the opaque barrier requirement.
According to Zoning Code, Article 5 Section 7.24, the Planning Commission can consider a waiver
request to eliminate the opaque barrier (fence component) and require only landscaping in cases
where noise is not a concern and the vegetation alone is considered a desirable aesthetic alternative.
We are requesting that the Planning Commission grant the waiver to eliminate the fencing
component of the opaque barrier requirement. The portion of the property directly adjacent to the
residential use is 23.98 feet. A fence currently exists on that property separating the two properties.
Landscaping in the form of a durable and continuous evergreen planted screen, or a hedge will be
provided as required by Article 5 Section 7.24 of the Zoning Code.
Please do not hesitate to contact us, if you have any questions or comments with regard to the above
items. We appreciate your review of this project and consideration of the requested waivers.
Very truly yours,
DUFFIELD ASSOCIATES, INC.
K. James Taylor, Jr., P.E.
Project Manager
KJT:acj
12000CA.0419-Dover-WaiverRequest.COR
Page 44
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 27, 2019
APPLICATION: Retail Facility 515 S. DuPont Highway
FILE #: S-19-07
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 PUBLIC Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
WATER
Page 45
Retail Facility at 515 S. DuPont Highway
File #: S-19-07
March 29, 2019
Page 2 of 4
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
c. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7025 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must
be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must
be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is
required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside
of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the
domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow-up detail of this layout is
recommended.
6. The proposed water tap on the existing City of Dover water main shall be completed by wet tap using a tapping sleeve
manufactured by Powerseal, model number 3490AS.
7. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The
Department of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind
flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and de-chlorination. The flange
must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve
shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the
floor to the ninety-degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through
walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
8. The water meter shall be installed outside, in a meter pit or vault, on the domestic water service, in a non-traffic
bearing location.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
Page 46
Retail Facility at 515 S. DuPont Highway
File #: S-19-07
March 29, 2019
Page 3 of 4
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures, including cleanouts.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other
requirements are met. Any projected future flow requirement must be clearly identified.
6. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings)
showing that velocity and all other requirements are met.
7. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
8. If kitchen facilities are proposed a minimum 1,000-gallon, two chamber grease trap, meeting all Kent County
ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the
proposed location, must be provided on the plan.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted
to our office.
SANITATION / GROUNDS
1. None.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The proposed pylon sign shall be placed a horizontal distance of ten feet (10’) away from underground utilities and
stormwater infrastructure.
3. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13111.pdf.
WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
Page 47
Retail Facility at 515 S. DuPont Highway
File #: S-19-07
March 29, 2019
Page 4 of 4
ELECTRIC
1. Please provide estimated load sheets for proper sizing and type of service and proposed Utility plan.
2. There may be possible existing pole and equipment movement required and those costs will be incurred by applicant.
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking
Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan
sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the
Office of Drinking Water until review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
4. Water impact fees may be required for this proposed site plan.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Prior to plan approval, the sanitary sewer system plans may be required to be submitted to the DNREC, Division of
Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible
for providing all application fees, completed forms and plan sets directly to DNREC.
3. Wastewater impact fees may be required for this proposed site plan.
4. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm
sewer crossings must be shown on the profiles.
STORMWATER / GROUNDS / STREETS
1. None.
SANITATION
1. Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide
adequate capacity for the solid waste placed out for collection without overloading the capacity of the containers. The
City of Dover shall provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2)
90-gallon recycling containers.
2. Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
3. Any commercial customer requiring more containers, or larger containers than provided above, must utilize private
service.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 48
C F
S-19-07 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 03/27/19 D S
O H
V A
E L
R
APPLICATION: Retail Facility at 515 South DuPont Highway
FILE #: S-19-07 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is retail facility (mercantile, if other please advise).
2. Building Access shall be no further than 50 feet from a primary entrance
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times
the width of the door(s) or for 10 feet, whichever is greater.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 50% (25% if sprinklered) and clearly shown on the plans.
Perimeter Access minimum width shall be 15 feet measured from the face of the building at grade
with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser
units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere
with emergency services fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3)
5. Fire lanes shall cover TBD of the proposed building.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by
the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be
served by a fire lane even if this exceeds the percentage as required.
Page 49
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and
the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one
or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in
height.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located
closer than 15 feet to the exterior wall.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top
and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid
yellow demarcation line shall mark the edge(s) of the fire lane.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150
foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher
than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and
signs shall face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in
lieu of fire lane signs and shall conform to the specifications of 7.6.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over
any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall
be provided and the portion of the building perimeter which contains overhangs, canopies,
balconies, or any other building features shall not apply towards the fire lane accessibility
requirements of Section 4.0, Table 5-1 in this chapter.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. Multiple Access Roads shall be provided when a fire department access road (fire lane) is
determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain,
climatic conditions, or other factors that could limit access such as placement of fire hose from
fire equipment.
12. Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article
VII, Section A. 13,
Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides
Page 50
Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides
Alley
12 feet wide
Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-sac
as outlined in the 2015 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
13. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10
in reference to this process.
14. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The
owner or their representative shall meet with the Fire Marshal prior to submission to agree on the
system. A letter of agreement shall be created and signed by both parties. The letter shall include
a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to open.
A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not
less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate
shall be setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
15. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation
and as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4")
demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the
center line of the fire hydrant and extend for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel
bollards filled with concrete and marked yellow shall be installed at the outermost corners of the
fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the
finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be
positioned so as to be facing the edge of the street, or traffic lane.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
Page 51
The owner is responsible if the hydrant is private.
16. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel
under the top flange, hydrant bonnets shall be color coded based on the following criteria: class
AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 -
999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM -
painted black.
(2015 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
17. Fire Alarm System TBD per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy
determined to be a place of assembly by the fire marshal, and is undergoing renovations in excess
of 50 percent of the assessed value of the building and is capable of receiving an occupant load 75
persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall
be required to install a complete fire alarm system in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard
by occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the
average ambient sound level or five decibels (dB) above the maximum sound level having a
duration of at least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in
the area required to be served by the system using the A-weighted scale dBA. In the event the
stated requirement cannot be met a shunt trip relay/switches shall be the approved method of
meeting the intent of this section of the Code.
(City Code of Ordinances 46-171)
18. Sprinkler system TBD (plans show 6” fire service on construction details) System is to be
monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions
which are modified by more than 50% after the effective date of these Regulations. The 50%
figure shall be calculated utilizing the gross square footage of the building, structure, marine
vessel, premises and conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval for
a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square
footage of a non-sprinklered building, may not have another such project for the same building submitted
for review and approval any sooner than three (3) years after the date of the final inspection unless
sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing,
processing, display or sale of combustible goods, wares, merchandise, products, or materials when more
than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
Page 52
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding
two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment
buildings storage areas except individual unit closets that are located within individual residential living
units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as
adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under
the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler
Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or private
school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such
dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant
load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an
occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13 when the following
apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where
alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant
load greater than 100 persons and where alcohol will be served for consumption on the premises.
Any additions or increase in interior size to an existing place of assembly which would create an
occupant load of 100 persons or greater and where alcohol will be served for consumption on the
premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in
accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
19. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located
within 50 feet of main entrance. Access to the Fire Department Connection must be clear
unobstructed access as defined by the AHJ.
20. Parking and/or obstructions shall be prohibited in front of fire department connections for a
distance measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
21. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
Page 53
22. If there is any type of rack storage, the following will be required: 1) a diagram showing the
layout and type of rack system 2) a list and quantity of items being stored 3) a letter from an
authorized/licensed fire suppression contractor stating that in rack sprinklers are or are not
needed. If in rack sprinklers are not needed, a letter may be requested from an authorized/licensed
fire suppression contractor to ensure that the sprinkler system is adequate for the storage
presented.
23. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in separate
protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete.
The bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in
concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
inches (four ft.) in height above the finish grade elevation. Any deviation of the stated
requirements must be approved by the fire marshal and/or chief building inspector. The above
dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief
building inspector shall have the authority to require more stringent dimensions to fit the needs of
devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors
shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must
be approved by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
24. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum
of four inches in height, location, the number shall be placed on the house above or to the left or
right of the front entrance, color, the number shall be contrasting to the background color, Arabic
numerals, all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches
when identifying individual apartments with exterior doors, and 12 inches when identifying
buildings with apartment complexes where there are two or more buildings not assigned street
addresses. Individual buildings with street addresses shall have numbers measuring six inches,
location, numbers shall be placed either in the center of the building or on the street end of the
building so as to be visible from either the public or private street or from the parking lot, color,
numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be
Arabic numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12
inches in height, location generally, numbers shall be placed either in the center of the building or
on the street end of the building so as to be visible from either the public or private street or from
the parking lot,
Page 54
property line or driveway, should the building be located far enough from a public or private
road so that the numbers are not clearly visible from the street, then the street address shall also
be posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed
on each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
25. TBD A lock box (Knox) containing any and all means necessary for fire department access shall
be provided at the following occupancies: any occupancy that contains a fire alarm signaling
system that is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2015 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for
any new or existing building where a fire alarm or sprinkler system is being installed. It shall
be the responsibility of the owner or occupant to keep a set of keys in the secured key box
that are current to the locks of the protected occupancy. Buildings with 24-hour staffing or
guard service shall be exempt from this subsection.
Location. The secured key system shall be located as close to the main entrance as possible.
Should the building design not allow the secured key system to be located by the main
entrance, the fire marshal and fire chief shall come to an agreement as to an alternate
location for the key box. A secured key system, once installed, shall not be obstructed from
view or obstructed by any means that would delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or
egress, whether on the interior or exterior of the building, and keys to locked mechanical
rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area
protected by automatic fire detection. Keys to individual residential apartment units are not
required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the
key box for new buildings. It shall be the responsibility of the owner or tenant to order the
key box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted
before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
26. All required means of egress shall have an exit discharge consisting of a non-slip surface and
leading to and terminating at a public way.
27. Project to be completed per approved Site Plan.
28. Full building and fire plan review is required.
Page 55
29. Separate building permits/plans submission will be required for each building and/or tenant fit
out. If the permit submission is for a “shell” a Certificate of Occupancy will not be issued.
Separate plans and permits submissions will be required for each “tenant fit out” at which time a
Certificate of Occupancy will be issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems
(for the “shell”) must be accepted into service prior to any “tenant fit out” fire permits being
issued.
30. Construction or renovations cannot be started until building plans are approved.
31. Fire alarm systems, fire suppression systems, hoods, and hood suppression systems require a fire
permit from the Fire marshal’s Office. This work cannot be started until the permit is approved.
32. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Ensure item # 4 listed above is followed regarding perimeter access
2. Ensure item # 6 listed above is followed if Fire Lanes are required
3. Item # 12 listed above has the following noted: Any dead-end road more than 300
feet in length shall be provided with a turnaround or cul-de-sac as outlined in the
2015 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3. It appears that
the road to the rear of the building is approximately 360’.
4. Plans show 6” fire service into the building on construction details. If a sprinkler is
provided or is required ensure item #’s 18-22 listed above are followed (believe that a
fire hydrant is on the highway in front of the proposed building)
5. Ensure item # 23 listed above is followed regarding impact protection
6. Ensure item # 24 listed above is followed regarding properly labeling the
address/suites
7. Ensure item # 25 listed above is followed if a FAS or FSS is provided
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2015 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2015 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2013 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2013 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2015 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 56
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 27, 2019 T
===============================================================
APPLICATION: Kent Del Properties (515 South DuPont Highway)
FILE#: S-19-0 7 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Joshua Schwartz PHONE#: 302-760-2768
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. The parcel will be required to obtain a Letter of No Objection for the Site/Record Plan and Entrance
Plan approval from DelDOT for the proposed development.
2. The developer and the engineer shall submit a pre-submittal meeting request through the PDCA to
begin the plan review process.
Page 57
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
APRIL 2019
APPLICATION: Retail Facility at 515 S. DuPont Hwy FILE #: S-19-07
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Jessica L. Verchick, EIT PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE
FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE
APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan
must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of plan
submittal to our office. Construction inspection fees based on developed area and stormwater facility maintenance
inspection fees based on the number of stormwater facilities are due prior to the start of construction.
2. The following notes must appear on the record plan:
• The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
• The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment control
measure, as it deems necessary.
• A clear statement of defined maintenance responsibility for stormwater management facilities must be provided
on the Record Plan.
3. A soils investigation in the proposed Stormwater facility area(s) is required to determine impacts of the seasonal high
groundwater level and soils for any Best Management Practice (BMP) design.
ADVISORY COMMENTS TO THE APPLICANT:
1. A pre-application meeting was held on March 20, 2019.
2. Green Technologies (infiltration, bio retention, bio swales, filter strips etc.) must be implemented to comply with the
Delaware Sediment and Stormwater Regulations.
3. The preferred methods of Stormwater management are those practices that maximize the use of the natural features of
a site, promote recharge and minimize the reliance on structural components.
4. It is recommended that the stormwater management areas be incorporated into the overall landscape plan to enhance
water quality and to make the stormwater facility an attractive community amenity.
5. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management plan
has been approved.
Page 58
City of Dover, Delaware
2019 Comprehensive Plan
Project Update April 2019
Overview
The current Comprehensive Plan for the City of Dover is the 2008 Comprehensive Plan (as
amended) as adopted February 9, 2009 and certified.
The development of the 2019 Comprehensive Plan is a major goal of the Planning Office
(Department of Planning, Inspections & Community Development) for 2018-2019. This project
is being completed in-house by City Staff consisting of the Planning Staff who began meeting in
February 2018 to initiate work on the project. The last formal Update on the Project to City
Council was presented in October 2018.
See the 2019 Comprehensive Plan Webpage for project information and the links under
“Additional Resources” for documents issued.
o https://www.cityofdover.com/2019-comprehensive-plan
Project Schedule
The Comprehensive Plan was due to the State for Certification on or before February 9, 2019. In
order to achieve Certification, the Comprehensive Plan must complete the PLUS Review process
and be adopted by the Planning Commission and City Council. In September 2018, the Planning
Staff requested an Extension (of the plan submission deadline). On March 12, 2019, the Cabinet
Committee on State Planning Issues approved a comprehensive plan extension; with this action,
the City’s plan will need to be certified on or before February 2020.
The project schedule consists of five basic phases: Information Gathering, Plan & Map
Development, Consideration of Plan Recommendations, Formal Review & Adoption Process,
and Plan Implementation. The project is in the Plan & Map Development phase. The Plan &
Map Development Phase involves Chapter Writing, Review & Preparation of the Map Set, and
Development of Goals, Recommendations & Actions. Information Gathering and Consideration
of Plan Recommendations are also occurring with various Engagement Events.
The continued Consideration of Plan Recommendations Phase involving the General
Endorsement of a DRAFT Plan by the Planning Commission and City Council, PLUS Review,
and then the Formal Review & Adoption Process are anticipated for Summer 2019.
Tasks to Date
As part of the Information Gathering Phase and Plan & Map Development Phase, the following
tasks occurring from October 2018 through April 2019 are noted:
2019 Comprehensive Plan: Project Update April 2019 Page 1|3
Page 59
• Biweekly and weekly meetings of the Project Team: Involving review and development
of plan text, discussion of Plan elements, review of Maps
• Meetings with the City Departments and Divisions as needed
• Meetings/Information Gathering with the State Agencies and Other Groups as needed:
• Updates and Discussions on Plan with Planning Commission and Historic District
Commission at monthly meetings.
• Intergovernmental meetings held with Kent County, Camden, Cheswold, and Little
Creek. Staff is working to schedule a meeting with the Town of Wyoming.
• Release of Preliminary Drafts of select Maps (in October 2018) with on-going review and
refinement of Maps.
• Release of Preliminary Draft #2A Goals & Recommendations. Released to Planning
Commission and Historic District Commission. Also, to be posted on Project Website.
Engagement Activities
Events & Activities (2018-2019):
• Reporting on Evaluation of Goals & Recommendations from 2008 Plan: Reporting of the
results of the evaluation task assignment to members of Planning Commission and
Historic District Commission.
• Survey Questionnaire: A Questionnaire was available June-July 2018 in on-line and
paper copy formats. There were over 511 respondents.
• Event: “Dover Economic Development Forum: An Economist Vision of Dover” on June
13, 2018, 10:00am-1:00pm at Wilmington University. A panel presentation and
discussion on the future of Dover’s economy.
• Event: “Understanding Housing Market Trends: Discussion with Realtors and
Homebuilders” held on July 11, 2018 at Economic Development Committee Meeting.
• Open House Event on the Comprehensive Plan held on August 23, 2018 from 3:00pm to
7:00pm with presentations at 3:30pm and 5:30pm. Over 65 attendees. Presentations,
hands-on activities, maps on display for review.
• Event: Presentation to Wesley College class and guests held on September 27, 2018 upon
request of Adjunct Professor Dr. Tony DePrima. Presentation on Comprehensive Plan
process and then interactive discussion on Dover as a “College Town.”
• Discussion with City’s Economic Development Committee at multiple meetings in
Winter 2019.
• Intergovernmental Meetings with Cheswold, Little Creek, Camden, and Kent County.
Information Sources:
• City’s website includes the 2008 Comprehensive Plan document (plan text and map
series).
• Created page on City’s website for the 2019 Comprehensive Plan Project. Information is
posted on survey results, presentations, and Preliminary Draft documents and maps.
o Preliminary DRAFT Land Development Plan Map Series (4 Maps Quadrants
A-D: Released 8/23/2018) showing land use classifications for all properties in
the City.
2019 Comprehensive Plan: Project Update April 2019 Page 2|3
Page 60
o Preliminary DRAFT Annexation Plan Map Series (2 Maps Released
10/5/2018) showing Potential Annexation Areas and Potential Land Uses for
Annexation Areas.
• Email Activated to receive comments on Comprehensive Plan
• Ongoing guidance and assistance from the Office of State Planning Coordination
• Various information and assistance received from City Department and State Agencies
• Received Delaware Population Consortium Annual Projection Series issued October 2018
To Be Scheduled Activities and Outgoing Tasks:
• Follow-up/Meetings with City Departments as needed
• Follow-up/Meetings with relevant State agencies as needed
• Release of Preliminary Draft documents to City Council Committee of the Whole, the
Historic District Commission, and other groups for review
• Intergovernmental coordination meeting to discuss Plan to be scheduled with Wyoming.
• Continue work tasks on Chapter Writing and Map Development
• Release of Preliminary Draft #2A Goals & Recommendations document
• Preparation of Draft Plan document and Maps
• Planning for next Outreach opportunities to public and stakeholders
• Review Processes: PLUS Review Submission and formal review processes with Planning
Commission and City Council
For Review:
Preliminary Draft Document #2A Goals and
Recommendations
The following Preliminary DRAFT Document has been released for review, discussion and
comment. See attached item. While the Planning Staff Project Team continues to development
the Comprehensive Plan, we are seeking input and comments from various groups,
stakeholders, and the public.
The City Council and Council Committee of the Whole are encouraged to review this Preliminary
DRAFT documents and be prepared for discussion with any comments and questions.
• Preliminary DRAFT #2A Goals & Recommendations (Dated 2/28/2018) from the topic
chapters.
o Chapters include: Natural Resources & Environmental Protection; Historic
Preservation; Public Utilities & Infrastructure; Community Services & Facilities;
Transportation; Economic Development; and Housing & Community
Development.
2019 Comprehensive Plan: Project Update April 2019 Page 3|3