Page 1
-CITY OF DOVER BOARD OF ADJUSTMENT
AGENDA
Wednesday, August 21, 2019 at 9:00 AM
City Hall, Council Chambers
15 Loockerman Plaza, Dover, Delaware
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES of July 17, 2019 Meeting
COMMUNICATIONS & REPORTS
1. Reminder: The next Board of Adjustment regular meeting is scheduled for September 18, 2019
at 9:00am in the City Council Chambers.
NEW BUSINESS
Applicant #V-19-07
805 and 815 Forest Street, and 726 West Division Street. Victor Giangrant has requested a variance
from the requirements of the Zoning Ordinance, Article 4 §4.15 pertaining to the maximum lot coverage
in the C-3 (Service Commercial) Zone, and Article 3 §27.67 pertaining to the lot coverage, front, side
and rear yard setbacks/landscaping requirements for the Corridor Overlay Zone (COZ-1). They are
requesting the above variances to be able to utilize the entirety of the two lots addressed as 815 Forest
Street and 726 West Division Street for their expanded car wash facilities, namely thirteen (13) new
parking spaces with vacuum stations. Subject properties are zoned C-3 (Service Commercial Zone) and
are subject to the COZ-1 (Corridor Overlay Zone). Tax Parcels: ED-05-076.08-01-40.00-000, ED-05-
076.08-01-38.00-000, ED-05-076.08-01-39.00-000. The owners of record are Clean Cars Inc. and
Melinda F. Giangrant.
ADJOURN
29 Del. C. § 10004(e)(2)
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS
SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS,
INCLUDING EXECUTIVE SESSIONS.
Page 2
CITY OF DOVER
BOARD OF ADJUSTMENT MINUTES
July 17, 2019
A Regular Meeting of the City of Dover Board of Adjustment was held on Wednesday, July 17,
2019 at 9:00 A.M. with Chairman Sheth presiding. Members present were Chairman Sheth, Mr.
Keller, Mr. Hufnal, Colonel Ericson and Mr. Senato.
Staff members present were Mr. Diaz, Mr. Hugg, City Solicitor Mr. Rodriguez, Code
Enforcement Officer Ronald Coburn and Mrs. Savage-Purnell.
APPROVAL OF AGENDA
Mr. Hufnal moved to approve the agenda as submitted. The motion was seconded by Mr. Keller
and unanimously carried 5-0.
APPROVAL OF THE REGULAR BOARD OF ADJUSTMENT MEETING MINUTES
OF MAY 15, 2019
Mr. Keller moved to approve the meeting minutes of May 15, 2019 with the necessary
corrections. The motion was seconded by Mr. Senato and unanimously carried 5-0.
OPENING REMARKS CONCERNING APPLICATIONS
Mr. Dave Hugg, Planning Director stated that the meeting today will be conducted in accordance
with the Agenda. There is one (1) application on the agenda under New Business. Each Application
file will be read, and the floor will be opened for questions of the applicant by the Board and for
public testimony. If the Board needs to consult the City Solicitor, they will recess to discuss legal
matters. If the applicant must leave, they can contact the Planning Office at 736-7196 to learn of
the Board’s decision. A formal notice of the decision will be mailed to the applicants. Approved
variances expire after one year if the approved project has not commenced.
All public notice for the new application on this agenda was completed in accordance with Code
requirements. The meeting agenda was posted in accordance with Freedom of Information Act
requirements.
COMMUNICATIONS & REPORTS
The next Board of Adjustment regular meeting is scheduled for August 21, 2019 at 9:00am in the
City Council Chambers.
NEW BUSINESS
Applicant #V-19-06
623 Fulton Street. Harrington Commercial LLC c/o Michael H. Harrington, Sr. has requested a
variance from the requirements of Article 6 §3.6 of the Zoning Ordinance related to surfacing of
parking areas and access drives, in order to extend a previously approved 2015 variance from the
same requirements. Reapproval of the variance would allow the continued use of the existing
gravel parking lot on the property past the year 2020. Subject property is zoned IPM (Industrial
Park Manufacturing Zone). The Tax Parcel is ED-05-076.08-01-13.00-000. The owner of record
Page 3
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
is Harrington Commercial LLC. The previous variance, V-15-06, was approved by the Board of
Adjustment on March 18, 2015, with the condition that the approved variance would expire after
five years.
Exhibits for the Record: Staff Report, Zoning Exhibit, and statement and plans submitted by the
applicant. Legal Notice was published in the Delaware State News on July 7, 2019. The public
was notified in accordance with regulations.
Chairman Sheth questioned if there was any member present who had a conflict of interest and
there was none.
Mr. Diaz gave a summary presentation of the Variance Application Request regarding
requirements of Article 6 §3.6 of the Zoning Ordinance related to surfacing of parking areas and
access drives, in order to extend a previously approved 2015 variance from the same
requirements. Reapproval of the variance would allow the continued use of the existing gravel
parking lot on the property past the year 2020. The previous variance, V-15-06, was approved by
the Board of Adjustment on March 18, 2015, with the condition that the approved variance
would expire after five years.
Mr. Keller asked with regards to the Planning Commission’s approval or lack thereof, is there
any step that should have been taken in the interim by the applicant which would have delayed
the Planning Commission’s approval? Mr. Diaz replied that the applicant submitted to Planning
Commission a plan that showed not what they currently have which is a gravel parking lot but a
plan showing an improved parking lot (a hard surfacing, parking striping, lights, landscaping,
etc.) Even though they gained conditional approval from the Planning Commission to construct
what they were showing in that plan, there were not any of the subsequent steps taken needed to
finalize the plan so that they could actually construct it. Those steps would include getting
approval from the individual reviewing agencies of the Development Advisory Committee
including the Public Works Department, Kent Conservation District and Fire Marshal. They
would have had to submit a Final Plan to the Planning Office that contained all the requirements
that were identified as part of the Planning Commission review.
Mr. Hufnal asked if the Planning Commission decision or requirement to have something done
by September 30, 2019 takes precedent over the Board of Adjustment variance approval to
March 2020. Mr. Diaz replied that he believed the reason that the applicant is asking for the
reauthorization now instead of in 2020 when the variance is due to expire is that once the
Planning Commission approval expires then the applicant will need to resubmit to the Planning
Commission. What their submission will look like will depend on whether they get a variance or
not. If the variance is approved, the applicant can submit a new application that shows just the
gravel parking lot. If they are denied, then their new application will have to show an improved
parking lot again.
Mr. Keller asked if the application process to the Planning Commission can be made and if
everything is in order to have a subsequent approval prior to the expiration of the variance that
was approved 5 years ago. Mr. Diaz replied if the applicant came forward with an application to
the Planning Commission that showed just the gravel parking lot and they did not receive a
2
Page 4
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
variance from the Board of Adjustment then they could still only have the gravel parking lot for
one more year even though the applicant had a successful Planning Commission application
because the variance had expired.
Mr. Senato questioned when the applicant went before the Planning Commission in 2016 it did
not depict the parking lot in its current state, but rather it showed asphalt, paving, stripping, etc.
on the proposed plan. Mr. Diaz replied that is correct. Mr. Senato asked if the applicant received
approval from the Planning Commission to move forward at that time. Mr. Diaz replied that is
correct. So, the applicant is back before the Board of Adjustment requesting another variance
which is basically the same temperament as roughly 5 years ago. Mr. Diaz replied that the
argument that was given by the applicant in the required responses had a few differences but was
more of the same.
Mr. Senato asked if the variance was approved today what procedure would be followed, and if
the owner of the property would go forward with the improvements to the parking lot rather than
sticking to another 5-year plan and not proceeding again. Mr. Diaz replied if the variance is
approved then the applicant would need to submit a new application to the Planning Commission
that shows the plan that just has the gravel parking lot in order to come into compliance. There
may be some other items that may need to be addressed in order to meet other agency
requirements such as stormwater on the property for Kent Conservation District. They would be
allowed to use the gravel parking lot with a reapproved variance.
Mr. Hugg asked Mr. Diaz to clarify that having the applicant come before the Board of
Adjustment today is because their Planning Commission approval expires prior to the 5-year
period expiration date. Mr. Hugg asked if this was correct? Mr. Diaz replied that is correct. The
applicant did not speak to Planning Office Staff about the application beforehand; they just
submitted the application.
Mr. Hugg asked if the Board of Adjustment (or should the Board of Adjustment) grants a 5-year
extension that really trumps their need to have a Final Planning Commission approval in place.
Or would their Final Planning Commission approval still be conditioned as it was originally? Mr.
Diaz replied that no matter whether you approve or deny a variance, the applicant will still need
to go to the Planning Commission and get a new plan. Whether the Board of Adjustment
approves or denies the variance, it just affects what they will be able to show on the plan,
whether it is gravel or asphalt.
Colonel Ericson stated that he would totally be against a 5-year extension. There has been no
history where the property owner has made any attempt to solve the problem. He could see a
year extension if there is serious thought and he would like to see a 30-day report on how they
are progressing. This has gone on long enough.
Mr. Keller asked if there was roughly 8-months remaining on the original variance. Chairman
Sheth replied yes. Mr. Keller asked if that seemed to be a reasonable time within which to
complete an application process or finalization of the matters that should otherwise be held
before the Planning Commission. Mr. Diaz replied if the applicant had not come before the
Board of Adjustment today what the applicant could have directly done within 8 months would
3
Page 5
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
be to file a new application to the Planning Commission to have a gravel parking lot and get
approved and then immediately expire because the variance would expire.
Mr. Senato asked if it could take more than 8 months. Mr. Diaz replied that it could, but if it did
not take more than 8 months the applicant would essentially be in compliance for a very short
period of time, maybe 3-4 months at most before the variance expired and then they would
probably have to pave the lot.
Colonel Ericson asked Staff if the lot could be paved before September 30th meeting the Code
requirements, then the variance would not be needed. Chairman Sheth replied that the question
could be asked of the applicant.
Mr. Senato mentioned that it is not the Board of Adjustment but Planning Commission that can
approve lighting and curbing. It states very specifically in Article 6 the requirements that must be
followed regarding parking lots. During this 5-year period why there was no compliance.
Chairman Sheth replied that to his understanding that the Staff denial was based upon the
applicant asking for a 5-year extension. Chairman Sheth asked Mr. Diaz if this was correct. Mr.
Diaz replied that the applicant did not specifically request a 5-year extension or any length of
time. They just started looking for approval of the variance. If the Board approved the variance
unconditionally, then they would be able to use the parking lot as gravel for as long as they liked
if they get Planning Commission approval.
Colonel Ericson mentioned that he recalled that the Board of Adjustment did the amendment for
limitations and the person that gave the testimony stated they could get it done in 5 years.
Chairman Sheth questioned if there was any member present who had a conflict of interest and
there was none.
Representative: Mr. Michael H. Harrington Sr., Owner and Mr. Troy L. Adams, Engineer,
Mountain Consulting Inc., Vice President.
Mr. Michael H. Harrington Sr. and Mr. Troy L. Adams were sworn in by Mr. Rodriguez.
Mr. Harrington Sr. testified that to start it is a matter of economics of why it had not been
developed. He serves on the Board of the DDP and they are working extensively on developing
the property east of the railroad tracks and whole area. In the future, you will see office buildings
being designed. He stated that he owns the property where Gede Insulation is a tenant which is
zoned Industrial. There is no real residential activity; it almost sits on an island by itself. He
mentioned this for general information as he practically owns the whole block. He also owns the
single-family home on Fulton Street. There was a house on this particular piece of land, but it was
damaged by fire then demolished. Next to that is the Primecare site which was the City’s
ambulance service for five or more years. Primecare lost their City contract and now the building
is vacant. Gede Insulation has roughly 50 employees. Their parking is for their employees only.
One of the problems with the property is the City of Dover does not have proper sewer ability to
handle stormwater management on that side of town. Throughout the years, we have had a lot of
drainage problems and flooding on that side of town. It would be less expensive if you could tie
4
Page 6
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
into a stormwater management system in that area. In order to make a parking lot of out this, he
would need to put in his own drainage system to handle all the water and the cost to do this would
be over $150,000 for a parking lot. He sees the future and he thought the future would be that
Primecare would ask for an expansion to service the City of Dover and that the property would be
developed. Primecare is a 24/7 operation. He took the Primecare property and retrofitted it for the
ambulance service. This included electrical hookups for their trucks and a sprinkler system inside
the building, but they are no longer there. Again, it is a matter of economics. If he gives this parking
lot up and does not use it at all or develop it into a parking lot, there is a good chance he will lose
Gede Insulation who has 50 employees because they would be forced to park in awkward ways.
At the current time, that area is fenced in for security purposes (parking their trucks). He also has
Toll Electric in that area and on Division Street there is Connections Community which is a
homeless service. From his parking lot standpoint, $150,000 is a lot of money. He would have to
abandoned it he guesses. He is asking the Board of Adjustment to consider what he is faced with
and consider the employment of 50 employees in the City of Dover and have a heart to work with
a businessman that is trying to make it work.
Chairman Sheth asked Mr. Adams if he had done work on Kent County stormwater system and if
he knew how big the pond was or if the whole parking lot was required as a drainage or partial that
can act like a drainage. How much of a stormwater system is required? Mr. Adams replied yes,
back when they were looking at it preliminarily the first time, they did an infiltration test. The land
does perk, which means water will drain down into the ground. Given the situation of not having
a public stormwater system to tie directly into then the system would have to be on-site. Some type
of infiltration technology would be best situated for this type of application.
Chairman Sheth asked what would happen if you had ¾ of ground finished and ¼ of the ground
was lower level can it be used as a drainage and remain as gravel? He asked Mr. Adams if he had
tried it that way? Mr. Adams replied that he had not tried it that way but getting back to economics,
this type of system by Code is over 5000 square feet so a letter of no objection would be required
from Kent Conservation District whether it is gravel or pavement.
Chairman Sheth mentioned that he was not questioning Mr. Adams’ judgement, he was asking if
¾ of the ground was finished and ¼ of the ground was lower level. He gave an example of when
he had a bowling alley. They had a gravel parking lot where they were able to park on one tenth
of an acre or less and it was fine. He is not saying that all grounds are the same, but how can you
save money and be respectful and helpful to the audience. So, if you have a partially finished
parking lot how can you satisfy the requirements of City of Dover and Kent Conservation District.
The suggestion of Colonel Ericson is that you cannot have an unlimited variance until you find
someone to do something so that the issue can be resolved.
Mr. Adams mentioned that he thinks what he is hearing that Chairman Sheth is asking if part of
the area could be paved and another portion be gravel. Chairman Sheth replied right; what Mr.
Harrington suggested and what Mr. Adams mentioned is the problem is financial because of the
requirement of the stormwater system. Mr. Adams replied correct. Chairman Sheth stated that was
his question, can a partial be done? Mr. Adams replied that it could be done; and he gets what
Chairman Sheth is saying in theory but to adhere to the Kent Conservation District requirements
they look at gravel the same as pavement. It is still an impervious surface and the calculations
5
Page 7
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
would come out the same. From their standpoint its 5000 square foot of disturbance that has been
done. Pavement and gravel are the same and same results when you run the calculations and count.
Chairman Sheth asked how large was the disturbance area? Mr. Adams replied the disturbed area
is a little over 1/3 of an acre which is 15,700 square feet. We could reduce the size of this parking
area.
Chairman Sheth asked from a previous statement that Mr. Harrington stated all the tenants could
leave. Mr. Adams replied they could. Chairman Sheth mentioned the option of the tenant helping
with the cost. Mr. Adams replied that we could talk with Gede Insulation; that is an option.
Chairman Sheth mentioned if Gede Insulation compromises and the Board agrees to give some
extension as suggested by Colonel Ericson, would that give you enough time and if by that time
nothing works then that would be the next course of action.
Mr. Keller asked Chairman Sheth with your discussion regarding the questions posed to Mr.
Adams, if he was talking in terms of having a portion of that lot fully paved and allowing the
balance of the lot area being constructed in a fashion somewhat similar to a water retention pond.
Chairman Sheth replied something like that to solve the issue. The question arises is do we need
to pave the parking lot which is a requirement. Mr. Harrington replied that the point of this subject
is when all 50 employees are there the lot is pretty much full. As much as he does not want to go
into the opposite direction, if they just did a small portion of the lot, it would not accommodate the
cars. Previously, until he brought the property the employees parked up and down Fulton Street
and on both sides of Ridgley Street. It was an ugly mess. If he is forced to shut this lot down, then
it will come back to employees parking on the street which is not good for fire and pedestrian
reasons or any reason. Economically, he truly believes that a purpose will come along that he will
be able to dedicate that property to economic development whether it be an office building or for
homeless, but the property will have a use in the future. Just to spend $150,000 to finish a parking
lot there would be a total waste of an opportunity for the future because it would probably be dug
up in the future if economic development present itself. In that area there is not a single thing that
is paved anywhere. In other words, not in his parking lot with Gede or the parking lot next to me.
Behind me the weeds and grass are very tall. This would be the only paved lot in the entire block.
He repeated, economically he would not be able to do it. He would just have to abandon the lot.
Chairman Sheth asked as he referred to paragraph two on page 6 of the Board of Adjustment
Report, how long it would take the applicant to prepare a development plan? Mr. Harrington
replied he did not know what he wanted to do with that piece of land. It would not make any sense
to try to develop the land. At the current time, he is not talking with anyone that has an interest
even in renting the Primecare building which is currently vacant. He has been doing a lot of
advertising. He is doing everything he can think of find a tenant and he is hoping to find a tenant
that would want to take the whole place and then we could do the whole thing and do a nice project
verses putting in a parking lot only for someone to tear it up.
Colonel Ericson stated that what bothers him the most is the parking lot was put in with no Building
Permit. Why was this done? Mr. Harrington replied that Gede Insulation against his will was just
parking on the empty lot just to get off the street. He really did not go to any big extent. With the
6
Page 8
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
ruts and holes where they were parking, he went to Gede Insulation telling them they could not
park. They ended up taking down the barriers and pulled into the lot to park. He just tried to keep
them from getting stuck.
Colonel Ericson asked the applicant if he knew it was not within Code when he put the gravel
down. Mr. Harrington replied no, he did not think that he could not put down gravel. He stated that
he was from Harrington, Delaware and where he comes from you are able to accommodate your
business needs. He did not think he needed a Permit and he apologized for it after he found out he
had done wrong.
Mr. Keller asked Mr. Harrington if he owned the Gede Insulation property? Mr. Harrington replied
yes.
Mr. Keller asked Mr. Harrington if he also owned what was known as Primecare Medical
Transport/support mechanic shop property? Mr. Harrington replied yes.
Mr. Keller asked Mr. Harrington if he also owned residential property on the left side of the gravel
parking lot? Mr. Harrington replied yes. He replied that he pretty much own everything in that
whole block. There are a couple of properties on the corner of Division Street that he does not
own.
Mr. Keller asked if he could presume that the Gede Insulation property is an income producing
property. Mr. Harrington replied yes.
Mr. Keller asked if he could presume that the Harrington ownership of Primecare Medical
Transport was under a former lease producing income. Mr. Harrington replied yes, he lost about
$3500 a month when they left.
Mr. Keller mentioned as he referred to Exhibit B of the Report and photos of the gravel parking
on the Fulton Street, Ridgley Street and Primecare Medical Transport properties. He could not
help but notice with the discussion about trying to overcome stormwater management if the lot
was paved. Photo #2 shows Fulton Street with curbing and gutter, Ridgley Street with a manhole
in the middle of the street at the intersection with Fulton Street and curbing and gutter in front of
the Primecare Medical Transport property which would tell him typically that there is stormwater
management along that series of streets and intersections with curbing and gutters and stormwater
in ground. He asked if that was the case. Mr. Harrington replied that he asked Mr. Adams why
they could not get any storm sewer for stormwater management and Mr. Adams told him that it
was over capacity. Mr. Adams replied that not only has he worked with them on this project but
also the Ridgley Street property that is north of this property that is vacant. He did preliminary
work on it when Mr. Shank was with us and in that system the pipes are very small, shallow, and
not deep at that end of town. The water does not run up hill. It is hard to get a system that we will
produce for a project like this to tie into it. So, between the pipes being small and they can only
carry but so much water and they struggle to carry the water that is presented to them at this point,
we would not be able to add to it.
7
Page 9
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
Mr. Keller asked with that being said have you calculated the runoff if this lot was paved as shown
on Exhibit A which shows all the gravel. Mr. Adams replied they have looked at that and yes it
has been calculated.
Mr. Keller asked Mr. Adams if he had taken the initiative to formally submit that to stormwater
management. Mr. Adams replied that they have not gotten to the point to submit it to Kent
Conservation District. He has had discussions with Mr. Jared Adkins at the Kent Conservation
District and they both agree that the system cannot handle the water that would be produced on
this project. That is why early on we did an infiltration test in preparation to put the water back
into the groundwater table.
Colonel Ericson asked Mr. Adams if he built infiltration system to put the water back into the
groundwater table. Mr. Adams replied it is possible although it is expensive.
Mr. Senato asked since the first approval almost 4½ years ago for the parking lot, what was the
capacity of the rental properties at that time and at what point did you start losing money. Mr.
Harrington replied at the time when it was previously approved, he had an agreement signed with
Primecare to move into that property. He was of the opinion that the ambulance service for Dover
would need to grow, so that started to design a building that would accommodate them. Even to
go one step further during that 5-year time period, he brought the house on the next property. He
thought the house on that property would later be torn down and the property would become a
parking lot for the expanded emergency ambulance service. Economically, it did not turn out that
way. He thought it was going to happen and that is what he was working towards. You cannot
control economics.
Chairman Sheth mentioned supposed he followed Colonel Ericson and the Board granted a one-
year extension that would give you 20-months to review the plans and go before the Planning
Commission before coming back before the Board of Adjustment. Suppose you find out that
nothing can be done (he is not saying that it is approved or disapproved) he is just debating.
Mr. Hufnal asked City Solicitor Mr. Rodriguez if the Board was to grant a one-year extension what
does that do to the Planning Commission’s conditional approval for September 30, 2019. It would
seem to him that they would have precedent over the Board of Adjustment decision and if the
Board of Adjustment granted an extension over their already deadline, what happens to that? Mr.
Rodriguez replied that the applicant would have to go back to the Planning Commission again and
get an extension like they did before of the September 30, 2019 deadline. He did not really
understand it but that is the requirement.
Mr. Hufnal questioned that it expires on September 30, 2019. Chairman Sheth replied yes, in the
next two months. Mr. Keller replied that September is the Planning Commission deadline for plan
approval. The Board of Adjustment variance deadline is March 31, 2020. He was initially curious
in this as to why the Board of Adjustment was addressing the issue when there is 8-months
remaining within what time you can initiate your approved variance application. He sees somewhat
how it is tied into the deadline imposed by the Planning Commission. He would hope that it is not
procrastination as mentioned by the Board on the part of Harrington Realty. It does seem to be an
excessive amount of time to have resolved the gravel parking area. It may come to a time even if
8
Page 10
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
there was an interim extension granted by the Board this morning that there has to be some hard
initiative taken to try to bring about your satisfaction with other tenants or reconstruction of the
Primecare facility or something. Because otherwise he does not see or personally would not be in
favor of approval of an allowance of that violation of a gravel parking area forever. It might come
to the point Mr. Harrington where you have to bite the bullet and pave the parking lot if you are
going to accommodate your tenant Gede Insulation and/or Primecare Medical Transport or other
development that takes place within that immediate area.
Chairman Sheth mentioned that after the September Planning Commission meeting, they will
come into the holiday season and you are not aware of the length of time for Kent Conservation
District approval. That is the reason that 20-months should be good enough to make a business,
intellectual and realistic decision for Mr. Harrington.
Colonel Ericson asked Mr. Harrington if one more year extension would be realistic from your
perspective. Mr. Harrington replied that it would give him a chance to really dig in and find out
the intricate problems he may face with doing that. Who knows, God might be good to him in
finding a good tenant and a reason to build on that lot. Again, economically it is difficult.
Colonel Ericson mentioned that he thinks everyone would like to see the parking lot for the people
working in that area as well as it is needed. He would like to see it developed because it does not
look like a lot of work has been put into it in the past from the Board’s perspective.
Chairman Sheth mentioned if the Board approves a one-year extension then very likely the
Planning Commission will give them an extension because it expires at the end of September.
Mr. Hufnal mentioned if the Board of Adjustment grants a one-year extension the Planning
Commission may want to coincide with the Board of Adjustment decision as well and have them
all expire at the same time. Chairman Sheth mentioned that makes sense.
Chairman Sheth asked the applicant if he was agreeable and clear on the suggestion. Mr.
Harrington replied it would give him a chance to make it happen; that’s what Realtors do, make it
happen. It is better than shutting him down and putting him in an economic difficult situation.
Colonel Ericson asked how the applicant gets the City to extend the (storm) sewer and if there was
any movement towards doing that someday. Mr. Rodriguez replied that he was not sure, but he
would probably go back to the Planning Commission and hopefully get an extension. As he
understood it, when the applicant went before the Planning Commission before he had it laid out
as a developed parking lot with everything. Mr. Keller replied that is correct and to include the
asphalt paving. That is the matter pending before the Planning Commission right now showing the
fully developed parking lot.
Mr. Hugg wanted to clarify that the issue is not sewer, it is stormwater in this area. Mr. Adams
was correct in what he stated. This whole portion of the central western side of Downtown Dover
is subject to a lot of flooding issues of undersized pipes, channelization of natural drainage ways.
There are a lot of capacity issues that will be addressed at some point by the City. If you come
downstream, the water that ends up in the parking lot in Water Street area when they flood is all
9
Page 11
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
part of this same drainage system that is very constrained. Whatever he does on the site, Kent
Conservation District will ultimately determine what approach he will need to take and very likely
that will involve some type of infiltration system and on-site solution because there is no capacity
in a public system that would resolve this issue. It is not uncommon anymore to see asphalt parking
lots that have underground infiltration below them because there is no other place to dispose of the
water.
Chairman Sheth mentioned if the Board grants an extension it would expire on March 31, 2021.
Mr. Rodriguez mentioned that the extension date if granted was correct.
Mr. Keller asked in the ownership of the lot to the west (left) Exhibit A gravel parking area if Mr.
Harrington owned the lot where a single-family house formally stood that burnt down. Exhibit A
shows 123 feet to Ridgley Street, so he presumes that the frontage of that lot is another 120 plus
or minus feet. Would it involve separate applications if you cut the gravel parking as shown on
Exhibit A in half and then put the front portion of the AVA Commercial property in covered
parking area as well? It would free up at least ½ of the lot currently under question for stormwater
runoff. He did not know if the City would view those as less impacted applications per lot as
opposed to the total gravel parking area shown on this one property that is now under question.
Mr. Diaz stated if Mr. Harrington wanted to do a parking area on both lots he would have to go
before the Planning Commission. The benefit to doing it as stated is the open space on both lots
for stormwater management. From what he has seen on other plans, you could do a dry or wet
pond instead of an underground system which would a lot more expensive than the other two
options.
Mr. Keller asked if it was water rention basin on each of those two lots it would be relatively small
and yet perhaps accommodate the runoff of two separate lots of paving for parking. Mr. Diaz
replied that is what he would think, yes.
Chairman Sheth mentioned it was a great suggestion, but the question is to make a business
decision. Mr. Harrington would need to develop alternate plans and consider the plans that was
suggested.
Mr. Hugg stated that he would remind the Board that at the end of the day the lots still have to be
paved in order to meet the Planning and Zoning requirements. Whether there are two lots of 4900
square feet which avoids the 5000 square feet threshold or whatever, they ultimately need to be
paved parking lots as part of the development plan. The Planning Department would like to see a
plan developed for this group of properties so that you could address the question of where the
stormwater plan is. Is it one big lot, two little lots, and where is the building going to essentially
be located? He cannot speak for what Mr. Harrington’s original intent was when he was discussing
this as being in transition and doing a development plan. He suspects that as he has acquired
properties, he must have given some thought of what this would look like eventually. We may not
be at a point where “eventually” is able to be defined but dividing the lots does not ultimately
resolve the paved parking lot problem.
10
Page 12
CITY OF DOVER BOARD OF ADJUSTMENT JULY 17, 2019
Mr. Keller mentioned that he made the comment earlier that the owner Mr. Harrington will
eventually have to pave the area for parking for his tenants Gede Insulation. If there was some
way that the parking areas could be extended westerly at a shallower depth. Perhaps it will facilitate
an easing of the pain of the parking matter. Perhaps this is something that Mr. Adams can look
into as well. Mr. Harrington replied that he thinks that it is a good idea; he had not thought about
that possibly. He was not sure if it would be approved, but we could take part of the property where
the house is located and design it for parking without having to put in a stormwater management
system and then take a part of the parking lot that we are talking about and put in stormwater.
Again, that is a good idea. He stated that the big cost is not the black top; it is the stormwater
management.
Chairman Sheth opened the public hearing.
Chairman Sheth closed the public hearing after seeing no one wishing to speak.
Chairman Sheth questioned if there was any additional correspondence for the record. There
was none.
Colonel Ericson moved to approve variance application V-19-06 for a one-year extension to
expire on March 31, 2021 based upon the Staff Report and testimony given. The motion was
seconded by Mr. Senato. The motion unanimously carried 5-0.
Mr. Hugg reminded the applicant to make a new application to the Planning Commission and
address their deadline.
Mr. Diaz mentioned if the applicant wanted to do a half parking lot in each lot that would
require a new application. Otherwise, if the applicant wants to do the gravel parking lot on the
whole lot that would still require a new application because the one that you have now shows the
improved parking lot.
Mr. Harrington stated message received.
The meeting was adjourned by Mr. Senato and seconded by Mr. Hufnal at 10:19 A.M.
Sincerely,
Maretta Savage-Purnell
Secretary
11
Page 13
City of Dover
Board of Adjustment
August 21, 2019
V-19-07
Location: 805 and 815 Forest Street, and 726 West Division Street
Applicant/Owner: Victor Giangrant/
Clean Cars Inc. and Melinda F. Giangrant
Tax Parcels: ED-05-076.08-01-40.00-000, ED-05-076.08-01-38.00-000, ED-05-
076.08-01-39.00-000
Application Date: June 14, 2019 (postponed until the August 2019 meeting)
Present Zoning: C-3 (Service Commercial Zone)
COZ-1 (Corridor Overlay Zone)
Present Use: Commercial (West Side Car Wash)
Two (2) one-family structures no longer occupied
Proposed Use: Expansion of West Side Car Wash (drive aisles and additional
parking/ service spaces)
Reviewed By: Julian Swierczek, Planner I
Variance Type: Area Variance
Variances Requested: Increase the maximum Impervious Lot Coverage in the C-3 Zone
Increase Impervious Lot coverage in the COZ-1 Overlay Zone,
Decrease minimum front, side and rear yard setbacks in the COZ-1
Project Description
The applicant is requesting variances from the Zoning Ordinance, Article 4 §4.15, pertaining to
the maximum lot coverage allowed in the C-3 (Service Commercial Zone), and Article 3 §27.67
pertaining to lot coverage, front, side and rear yard setback requirements of the COZ-1 zone.
These are being requested as the applicant is planning to demolish the two (2) existing structures
on the properties addressed as 726 West Division Street and 815 Forest Street. Then the two lots
would be paved in their entirety to allow for an additional lane for the car wash, a drive aisle and
thirteen (13) parking spaces that would each contain one (1) umbrella-like structure and vacuum
equipment.
Page 14
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 2 of 10
A plot plan of the demolition and subsequent site improvements is provided by the applicant in
Exhibit B. The applicant has also submitted a series of renderings and photos showing the
features proposed for the site as Exhibit C. It should be noted that the Application for Variances
as submitted by the applicant also notes a requested variance from Article 5 §1.1 as related to
Accessory Structures. However, the above referenced section of Code only relates to Accessory
Structures in a Residential Zone. This does not apply to these lots as zoned, so it is not included
in this Report for consideration.
This project has not yet been reviewed by the Planning Commission; submission and approval of
a Site Development Plan application would be needed before the proposed site improvements
could be implemented. The three parcels currently addressed as 805 and 815 Forest Street, and
726 West Division Street would be consolidated as part of the Site Development Plan.
Adjacent Zoning and Land Use
A Zoning Map Exhibit (Exhibit A) prepared by staff is attached to this report showing the
properties and surrounding zoning. The applicant has also provided Exhibit B showing the
boundary of the property and surrounding properties. The properties are located on the south side
of West Division Street, north of Forest Street and east of Weston Drive.
The subject parcels are zoned C-3 (Service Commercial Zone) and subject to the COZ-1
(Corridor Overlay Zone). The adjacent properties have a mix of various commercial and
industrial uses distributed among three (3) different zoning designations, as well as residential
uses. The properties to the east of the subject property, addressed as 630 and 650 West Division
Street, are zoned C-3 (Service Commercial Zone) as well, containing a Church and a mini-
storage facility. Immediately adjacent to the west of the site is a property zoned C-1A (Limited
Commercial Zone) and contains a service establishment (Laundromat and Cleaners).
To the north across Division Street are properties zoned C-2A (Limited Central Commercial
Zone) containing a Funeral Home and IO (Institutional and Office Zone). The properties to the
south, across Forest Street from the site, are zoned RG-1 (General Residence Zone) and are
occupied by a series of detached one-family residences.
Code Citations
It is the interpretation of the Planning Office that the use of a Car Wash is considered a “service
establishment” which is listed as a permitted use according to Zoning Ordinance, Article 3 §15.
It should further be noted that C-3 also lists as a permitted use “Motor vehicle, boat, or farm
equipment sales or service, subject to regulations.” The use as a Car Wash is therefore a
permitted use.
C-3 (Service Commercial Zone)
Table 1 below lists the Zoning Bulk and Parking Regulations for the C-3 zoning district which
are found in Zoning Ordinance, Article 4 §4.15.
Page 15
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 3 of 10
C-3
Minimum required:
Lot area
Lot width (ft.) 100
Lot depth (ft.) 100
Front yard (ft.) 20
Side yard (ft.) 15
Rear yard (ft.) 10
Side or rear yards which adjoin a
30
residence zone (ft.)
Off-street parking
Per 300 sq. ft. floor area or 1
Per employee (whichever is greater) 1
Maximum permitted:
Building height
Stories 6
Feet 75
Floor area ratio 4.0
Lot coverage 80%
COZ-1 (Corridor Overlay Zone)
The subject properties and surrounding properties are also within the COZ-1 (Corridor Overlay
Zone). This overlay zone includes additional provisions related to building design, landscaping,
parking layout, and height among other criteria. Among these requirements for this site are:
• A front yard setback of between 20-30 feet
The COZ-1 also lists lot coverage limitations and a series of requirements for Open Space and
Landscaping from which the applicant is requesting variances as found in Article 3 §27.67:
(a) Lot coverage. Each lot shall have a minimum of 25 percent of the lot area dedicated to be
landscaped open space. A lesser amount of landscaped open space may be permitted when it
can be demonstrated to the satisfaction of the planning commission, through the site plan review
process, that, due to lot configuration and existing built conditions, the required minimum is
impractical.
(b) Frontage. Each lot shall have a landscaped open space of at least 25 feet in width, measured
from the back of curb along the entire frontage of the lot, except at points of site access. Trees
shall be provided along the frontage perimeter at a minimum rate of one tree for each 50 linear
feet of frontage.
Page 16
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 4 of 10
(c) Side and rear yards. A minimum of 15 feet of landscaped open space shall be provided along
all side and rear lot lines when abutting a residential use and a minimum of five feet when
abutting a nonresidential use. Tree plantings shall be provided along all nonfrontage perimeters
at a minimum rate of one tree for each 75 linear feet.
As with parking regulations, there are instances where bulk standards or other dimensional
criteria (such as setbacks) are stated in various sections within the Zoning Ordinance, such as in
the base zoning, overlays, or supplemental regulations. In cases where multiple standards are
given, the more stringent standard applies.
Exceptional Practical Difficulties Tests
Zoning Ordinance Article 9 §2 dictates the specific powers and duties of the Board of
Adjustment with regard to granting variances. Specifically the Board must determine:
2.1 Variance – The board shall have the authority to authorize variances from provisions of the
Zoning Ordinance that are not contrary to public interest where the board determines that a literal
interpretation of the Zoning Ordinance would result in undue hardship or exceptional practical
difficulties to the applicant. In granting variances, the board shall determine that the spirit of the
Zoning Ordinance is observed and substantial justice is done.
2.11 Area Variance. A variance shall be considered an area variance if it relates to bulk
standards, signage regulations, and other provisions of the Zoning Ordinance that address lot
layout, buffers, and dimensions. In considering a request for an area variance, the board shall
evaluate the following criteria and document them in their findings of fact:
(a) the nature of the zone in which the property lies;
(b) the character of the immediate vicinity and the contained uses therein;
(c) whether, if the restriction upon the applicant’s property were removed, such removal
would seriously affect neighboring properties and uses; and
(d) whether, if the restriction is not removed, the restriction would create unnecessary
hardship or exceptional practical difficulty for the owner in his efforts to make normal
improvements in the character of that use of the property that is a permitted use under
the provisions of the Zoning Ordinance.
Review of Application
As part of the application, the applicant was asked to summarize how the requested variance
relates to the above criteria. The applicant’s response is provided below along with a staff
assessment of the application in accordance with the required criteria.
1. The nature of the zone in which the property lies.
Applicant Response:
“All three properties are existing C-3 zoned. Upon acceptance of the variances, the
dwellings on 815 Forest St. and 726 W. Division St. will be demolished and all 3 parcels
will be consolidated into one property. We will then submit all engineered drawings.”
Staff Response:
The existing Car Wash use of the properties is a permitted use in the C-3 zone. Both
Service Establishments and Motor Vehicle Services are listed as permitted, and all
proposed site improvements are in line with the permitted uses.
Page 17
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 5 of 10
The site is also subject to the requirements of the COZ-1 (Corridor Overlay Zone) which
adds further bulk standards, landscaping and architectural requirements in an effort to
promote a more visually appealing street frontage. It should be noted that the requested
variances are inconsistent with the requirement of the COZ-1 Zone.
2. The character of the immediate vicinity and the contained uses therein.
Applicant Response:
“The character of the immediate vicinity is predominately commercially zoned. The
parcels in question are flanked to the west by the Emerald City Laundromat, E&J Liquors
to the south, Bennie Smith Funeral Home, 806 Hair Salon, and El Nopal restaurant are all
on the north and a mini storage, self-service carwash and Kingdom Church sit directly to
the east. 731 and 801 W. Division Street on the north side are currently zoned C-2A.
There are two residential properties on the south side adjacent to the property.
Subsequent rezoning will complement existing business in the immediate vicinity as well
as the west gateway to Downtown Dover.
We would like to offer our customers the option of vacuuming out their own vehicles. By
expanding our facility, we will be installing 13 new self-service vacuum stations
complete with trashcan and mat holders. Each station will also be softly illuminated. The
vacuum stations are only operable during business hours. It will have one centrally
located vacuum. The new third lane and 13 vacuum stations will help alleviate traffic
congestion on Forest St.”
Staff Response:
Staff agrees with the assessment of the neighboring uses as provided by the applicants.
Staff notes however, that a majority of the southern frontage faces residential properties
zoned RG-1 (General Residence Zone) and containing primarily one-family, detached
dwelling units.
This general area was developed prior to the inclusion of the COZ-1 provisions which
were adopted into the Zoning Ordinance in 1992. New development and redevelopment
along corridors subject to the COZ-1 must conform to the provisions which address
character defining design items related to landscaping, building and parking placements,
and design.
This area is also the subject to two studies related to redeveloping and improving the west
side of Downtown Dover. The first is the 2000 Strategic Development Plan for the West
Side, which lays out additional guidelines and goals for this site and the surrounding area
with the aim of improving the overall quality of the area and better integrating it into the
overall downtown fabric of the City of Dover. Secondly, is the Division Street/ Forest
Street Dover Capital Gateway Plan which similarly sets up guidelines for improving the
physical quality of the west end of both Forest Street and Division Street as a gateway
into the Downtown Dover area from the west. Staff believes that requested variances do
not respect the integrity of the goals as laid out in both studies.
Page 18
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 6 of 10
3. Whether, if the restriction upon the applicant’s property were removed, such removal
would seriously affect neighboring properties and uses.
Applicant Response:
“If the restriction is removed it would not negatively affect the neighboring properties
and their uses in any way. Since our area is primarily commercial, we would be
complementing the neighborhood. The vacuum station will be a beautiful addition to our
primarily commercialized area. In fact, it would relive the congestion of traffic that builds
up on Forest St. At this time, we can currently stack 20 cars in our two lanes. With the
addition of the new, third lane and the 13 self-service vacuum stations we will be
stacking and additional 10 cars in the new third lane and 13 cars in the vacuum stations
reducing approximately 300 feet of traffic off Forest St.”
Staff Response:
The variances requested by the applicant would in effect completely ignore the guidelines
set out in the COZ-1 (Corridor Overlay Zone) as well as the maximum lot coverage of the
C-3 at 80%. The requested variances, if approved as proposed would reduce existing
green space on the two lots to the west, impacting stormwater management. Finally,
while traffic stacking on Forest Street may be reduced, the overall traffic circulation on-
site and entry/exit points are of concern to staff.
Staff also notes that the neighborhood was subject of a corridor planning study in 2015
which resulted in the Division Street/ Forest Street: Dover Capital Gateway Plan and
Design Book. This plan includes various recommendations for revitalizing the Division
Street corridor, including ones related to urban design and land use. On page 12 of the
Plan, one of the Guiding Principles and Objectives laid out states:
Create an aesthetically pleasing, welcoming, and vibrant gateway to the Capitol
District that has a defined sense of place and attracts positive activity.
To achieve this objective, a series of action items are proposed:
-Increase habitable, inhabited properties and reduce dilapidated, vacant
properties
-Increase community and economic activity in the area
-Improve comfort and safety of visitors and residents
-Expand and improve greenspace / recreational facilities that provide
opportunities during and outside of daylight hours
-Create visually attractive streetscapes through landscaping, utilities, signage,
and other infrastructure
-Provide a visual landmark/monument
Page 19
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 7 of 10
In consideration of both the residential properties immediately across the street to the
south as well as the Area Studies which include items focusing on the aesthetic
improvements including landscaping, there may be other site designs that achieve better
compliance with the lot coverage and landscape buffer requirements. Staff is concerned
about paving the entirety of the two lots to the west which currently contain considerable
green space. This would detract from the overall quality of the surrounding area. Staff
would recommend design considerations that retain green space. Potential options
include elimination of the parking spaces at either end of the proposed row of vacuum
stations, instead utilizing those areas to contain landscaping and green space.
4. Whether, if the restriction is not removed, the restriction would create unnecessary
hardship or exceptional practical difficulty for the owner in his efforts to make normal
improvements in the character of that use of the property that is a permitted use under the
provisions of the Zoning Ordinance.
Applicant Response:
“If the restrictions are not removed it will restrict us from maintaining a profitable
organization which will jeopardize our entire company. It will not be feasible to proceed
with our proposed additions. Without the modernization of the newest technology which
is rapidly taking the carwash industry by storm our business most certainly faces failure.
Not only for the Giangrant family, who owns and operates Westside Carwash, but also
the 120+ employees we employ annually and their families. Without these variances
lifted we will not be able to operate a modern facility for our customers. We need every
foot of the property to add a new third lane and the 13 vacuum stations to make it
operable in a safe and orderly fashion. Westside Carwash has been a family owned and
operated local business for 38 years and through four generations. We employ 120+ local
employees per year and we would like to continue this trend. With the addition of the
vacuum stations we will be creating additional jobs in the community. Without this
modernization our full-service carwash will become obsolete in the face of both new and
current competition creating not only a hardship for us, but also current employees, their
families and any future employees we hope to have. These proposed changes will keep
our facility updated. We would like to maintain our competitive edge in the carwash
industry as it is always changing. The vacuum station is the newest innovation in car
washing technology and it will help move our business into the future.”
Staff Response:
Staff recognizes the desire of the applicant to accommodate an ambitious scheme of site
improvements so as to remain competitive, noting that not having the ability to improve
and expand their business may lead to hardship on the part of the applicant. Staff also
acknowledges that the Westside Carwash opened for business at this location prior to the
implementation of the COZ-1 overlay, the regulations from which are the primary reason
they are requesting these variances.
However, Staff believes that accommodation can be made to allow for some of the
proposed site improvements while still trying to respect the integrity of the zoning as well
Page 20
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 8 of 10
as previous are studies with the aim of improving the physical quality of this area of the
City.
Variance Recommendations
The variances requested by the applicants pertain to the two properties currently addressed as
726 West Division Street and 815 Forest Street, not the main parcel containing West Side Car
Wash at 805 West Division Street. The applicant would have to go through the Site Plan
Application process with the Planning Commission where they would submit plans to demolish
the two existing houses on the two properties and consolidate both properties into the main
parcel currently containing West Side Car Wash at 805 Forest Street. The applicant would then
propose to redevelop the two parcels. They are seeking variances regarding the following bulk
standards and COZ-1 provisions:
COZ-1 Proposal (Variances Requested)
Side Yard (landscaped) 5 feet 0 feet
Frontage (landscaped) 25 feet 0 feet
Lot coverage 75% (80% for C-3) 100%
Staff recommends denial of the variances as requested (summarized above) for reasons as
follows:
• Previous Area Studies for the west end of Downtown Dover emphasize the
importance of landscaping and providing a tree canopy. The requested variances
would largely ignore the COZ-1 lot coverage/ landscaping provisions and the Area
Studies. Staff believes granting the variances in full would not be beneficial to the
wider community.
• The width of the proposed drive aisle and proposed lane 3 between the existing
second drive lane and proposed parking spaces for the vacuum station is shown as 22
feet and 16 feet respectively. Staff believes the width of these circulation areas may
be reduced to accommodate the 5 foot landscape buffer required along the western
edge of the sites property lines.
• The reduction in the number of proposed parking spaces for use of the vacuum
cleaning stations from thirteen (13), may allow for landscape areas at either end of the
parking along the West Division Street and Forest Street frontages so as to
accommodate in part the landscape buffer required along both frontages.
• Staff acknowledges both the desire of the applicant to remain competitive as well as
the fact that their business opened at this location prior to the implementation of the
COZ-1 overlay as well as the adoption of the area studies, however the two lots
subject to the variance requests are new redevelopments and should comply as strictly
as possible to the zoning provisions applicable.
Page 21
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 9 of 10
Advisory Comments to the Applicant
• If granted, variances become null and void if work has not commenced within one (1)
year of the date the variance was granted. At present there is no provision for
extension.
• Improvements to, and consolidation of the properties are subject to Site Development
Plan approval processes through the Planning Commission, and appropriate permits
from the City of Dover Department of Planning & Inspections and other agencies.
• Both West Division Street and Forest Street are state maintained roads and plan
submission will have to receive approval from the Delaware Department of
Transportation regarding site entrance location and/ or right of way improvements
(removal of curb cuts, sidewalk improvements, etc.).
Page 22
V-19-07 West Side Car Wash at 805 and 815 Forest Street, and 726 West Division Street
Board of Adjustment Report
Page 10 of 10
GUIDE TO ATTACHMENTS
Exhibit Description/Author # Pages
A Zoning Map Exhibit 1
(Staff)
B Site Plan of Proposed improvements dated 1
6/12/2019
(Applicant)
C Series of photos showing proposed features 7
(Applicant)
D Applicant Responses 3
(Applicant)
Page 23
City of Dover Exhibit A
Application No.: V-19-07
Department of Planning & Inspections
IPM
M
C-3
C-3 C-3
t
ely S
M
Ridg
r
ton D
Wes C-2A
IO
IO
C-2A ion S
t
Divis
Site C-3
C-1A
Fore
st St
C-1
C-1A
RG-1
RG-1 IO
C-3
Lincoln St
IO
Cherry St
C-3
Davis Cir
RG-1
R-8 RG-1
R-8
Title: Westside Car Wash Expansion
Addresses: 805, 815 Forest St and 26 W Division St
Parcel IDs: ED-05-076.08-01-40.00-000, ED-05-076.08-01-38.00-000, ED-05-076.08-01-39.00-000
Zoning: C-3 (Service Commercial Zone)
COZ-1 (Corridor Overlay Zone) Legend
Owner: Clean Cars Inc. & Melinda F. Giangrant
Subject Property
Date: 08/07/2019
Dover Parcels
Zoning
2012 Buildings
« 0 100 200 400 Feet
Kent County Parcels
Dover Boundary