SLC June 19 2019 packet
Parks, Recreation, and Community Enhancement Committee. Jun 19, 2019.
This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
7 pages have little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
SILVER LAKE COMMISSION
June 26, 2019
5:30 PM at Dover City Hall
Caucus Room
AGENDA
1. Welcome/Call to order
2. Approval of March 2019 meeting minutes
3. Security Upgrades update
4. Coordination with Parks and Rec Committee as a Whole
5. Budget update‐ SL park master plan funding
6. Public Works Updates
7. Senator Bikeway
8. Mayor’s Canoe/Kayak Event/Paddles, Sneakers and Treasures!
9. New Business
10. Next meeting date
11. Adjournment
Page 2
Silver Lake Commission
March 13, 2019
5:30 PM, Conference Room
Dover City Hall
** DRAFT **
Members Present Others In Attendance
Tricia Arndt Carolyn Courtney, Parks & Recreation Staff
Zach Carter Jason Lyon, Public Works Staff
Kirby Hudson Andrew Howard, DNREC Staff
Marie Kozel
Mike Lewis
WELCOME & CALL TO ORDER: 5:30 P M
INTRODUCTIONS
The chair noted we have new people and started off with introductions.
AGENDA
The chair presented the agenda for acceptance. The motion was made and seconded for approval. The agenda
passed without objection.
APPROVAL OF SEPTEMBER 2018 MINUTES
T
The chair presented the minutes for acceptance with one change, “Mr.” Arndt to “Mrs.”. The motion top accept
the minutes was then accepted without objection.
AF
The chair noted we have one vacancy to fill.
PUBLIC WORKS UPDATE
Mr. Lyon since the September meeting, there is now a Parks & Recreation maintenance crew. General park
maintenance has now been shifted to this new parks crew. Number 2, the area’s along the river’s edge. We are
making sure we treat this the proper way and not knock down vegetation that should be left alone. For
clarification, Mr. Carter asked if the park maintenance crew would be mowing. Mr. Hudson, no they are going to
D
work on athletic fields and “curb” appeal types of projects with assistance from Public Works. During periods of
snow our crew will be pulled to assist with snow removal. He invited the group to visit Dover Park and see the
R
improvements that have been done to date. The idea now is to keep it cleaned up and get the public to start
coming back to this park. Number 3, fertilize, lime, etc. ‐ looking the the budget and fertilizing with in‐house staff.
We will get on this project. Number 4, bottom of boat ramp problems have been addressed with filling in the
whole and under the dock areas. Number 5, the Silver Lake Dam inspection noted overall the dam is in good
condition without the need for immediate remedial actions.
The ponding on the sidewalk adjacent to the footbridge. We had provided proposals for imperious pavement that
was not accepted by this commission so we looked at infrastructure (see attach). Our grounds division then went
out cut the swale, trying to get the water to flow away from the sidewalk however due to the grading no matter
which way we we tried to cut the swale ponding continued. The next options are presented here as Option 1 and
2. Two different alignments, we are going to raise the sidewalk up and the water can dissipate then off to the side.
Just adding concrete is not going to work. The Master Plan for Silver Lake has been pushed out to FY21 at this time
and then a few years to actually do anything. Mr. Lyons options are the most viable for correcting this problem.
Mr. Carter motioned to accept Option 2, with a second the motion passed without objection.
Last item, the Silver Lake draw down went well in 2018, generally the same time every year. Ms. Courtney will
send out notices around August and reminders as the date gets closer. Following the same schedule,
approximately Oct. 7 – 18, 2019. Mr. Ridgeway ground supervisor will assist in opening/closing and monitoring the
draw down effects.
The Public Works Update is attached.
BOLLARD REPLACEMENT
Mr. Hudson reported that Ducks Fencing has completed the bollard replacements. We had an ORPT grant 50/50
match. The project costs was $18,000, ORPT covered $9,000 and the city covered the balance of the fee.
Page 3
MAYOR’S KAYAK/CANOE
Ms. Courtney shared a letter from Fran Riddle form the Bicycle and Pedestrian Subcommittee. We had a good
turn‐out for the 2018 event that was partnered with an open streets event. We are looking to do this again this
year on Labor Day weekend. We are adding some walking loops and other fun activities. Ms. Riddle will be invited
to our next meeting to share more details as they develop. The chair noted she liked the August idea, as October
was very cold for the last one. Members were supportive of the event those that are in town were invited to
attend.
NEW BUSINESS
Mr. Howard shared the preliminary results of the Mirror Lake testing. There was some improvement on the water
quality. Resident fish showed improvement over all with PCBs. He will continue to share updates with us.
(Presentation attached)
Mr. Howard is planning a wetlands clean up in May on the sand bar. All were invited.
NEXT MEETING DATE
June 12, September 11 and December 11 were chosen for the next meeting dates.
ADJOURNMENT
With no further business, the meeting adjourned at 6:10 PM.
T
AF
DR
Page 5
Battelle Conference on Remediation and Management of Contaminated Sediments
February 12 2019
Upal Ghosh, Eli Patmont – University of Mar yland Baltimore County
John Cargill and Rick Greene – Delaware Department of Natural Resources and Environmental Control
Page 6
~90 mi2 in central DE; drains to Del
Bay; mainstem dammed at Silver
Lake; 10 mi. non‐tidal, 12 mi. tidal.
Median Q = 21 cfs. Flat.
Land use/cover: Forested wetlands
in upper; urban/commercial in
middle; tidal wetlands in lower. Ag
throughout.
Features: City of Dover (Capital);
Dover Air Force Base
Sources: Waste sites, current & past
point source discharges, stormwater
runoff, atmospheric deposition,
contaminated sediments.
Page 7
Mirror Lake (~3.5 acres, 3’ deep) is part of the Saint Jones watershed (empties
to Delaware Bay).
It’s located at the gateway to historic Dover, DE. It’s impacted by
sedimentation, stormwater runoff, chemical contaminants, excess nutrients,
invasive plant species and bacteria.
Page 8
Mirror Lake/St. Jones River COCs
include PCBs, dioxins & furans, OC
pesticides, mercury and PAHs.
o Fish consumption advisories have existed in this
area of the St. Jones River since 1988
o Lacked ecological diversity and functionality
o Radiodated sediment cores collected downstream of
Mirror Lake indicated conditions improving.
However, model forecasts indicated decades for
recovery.
o In-place contaminated sediments controlled the
recovery time.
DNREC, in cooperation with several
partners, implemented the Mirror Lake
Remediation & Restoration Project in
the fall of 2013.
Page 9
Remediate the sediments in place to prevent
contaminants from entering the food chain, allowing the
fish advisory to be lifted or reduced in a matter of years,
not decades. Activated carbon (SediMite™) was chosen
as the preferred remedial alternative.
Restore habitat and improve the visual appeal of the lake.
Not discussed in this presentation.
Page 10
SediMite™ is a pellet made up of activated carbon (binds
contaminants), sand (aids sinking), and clay (temporarily
holds the pellet together).
79 tons of SediMite™ were incorporated into 5 acres of
lake bottom and downstream channel sediments over 10
days. Three main application methods were used.
This was the largest application of SediMite™ in the U.S.
This was the first State‐led project of its kind in the
nation.
Page 11
Bioaccumulation Application of AC Reduced Bioaccumulation
Page 12
Telebelt
Air Horn from Land Air Horn from Boat Air Horn at Low Tide
Page 13
Total = $0.94 million (includes planning, design,
construction, and monitoring for 3+ years)
$0.68 million from State HSCA program
$124.6K (local legislators, transportation funds)
$73.8K Fed NPS grant for restoration activities
$63K DNREC to develop plans & specs
Labor was largely volunteer and included:
61 total volunteers from DNREC, Brightfields,
AmeriCorps, Delaware Boot Camp, and the Interfaith
Mission.
551 hrs contributed from DNREC; 770 hrs from others.
Page 14
Bulk Sediment
Passive Samplers – Sediment Pore Water & Water Column
High Vol Water (XAD2 and Filters)
Sediment Bioaccumulation Study
Fish Tissue
Shallow Sediment Cores
Page 15
Carbon in sediment during low tide
4”
1”
After 1 month
Bioturbators
After 1 month After 1 year
Page 17
• Optimum dose of 3 – 5%
met
Optimum Dose
• Sediment/AC deposited
into thicker layer in low
flow region of lake
Page 18
Deploy for 30+ Days. Retrieve & extract contaminants from polymer. Results reflect
longer‐term avg. concentration of freely dissolved (bioavailable) contaminant.
Page 20
Freely dissolved PCB in the
sediment pore water dropped
~ 61% over 3 years.
Freely dissolved PCB in the
water column dropped ~80%
over the same period.
Station‐to‐station variability
explained by pond
hydrogeomorphology
Delaware & EPA human
health water quality criterion
= 64 pg/L
Page 21
Brown Bullhead
White Perch
Largemouth Bass Bluegill Golden Shiner
Blueback Herring
Page 22
48% ‐ 87% reduction in
resident fish (brown bullhead
and bluegill, respectively);
27% reduction in migratory
white perch
43% increase in migratory
blueback herring
Page 23
% reduction in porewater and water column dissolved phase PCB
(61% and 80%, respectively) is very similar to % reduction in PCB in
resident fish species (48% to 87%).
% reduction was slightly less than anticipated (70% ‐ 90%). This is
likely due to residual transport of PCB into Mirror Lake from
upstream and downstream (investigated by DNREC and UMBC/
currently negotiating remedy).
Project was recognized locally, regionally and nationally for its
innovative approach and demonstrated results.
Monitoring will continue periodically to track long term performance.
Page 24
2014: State of Delaware Governor’s Team Excellence Award
2015: American Academy of Environmental Engineers & Scientists Honor Award
2016: Water Resources Association of the Delaware River Basin Government Award
Page 25
Dr. Rick Greene, DNREC, Watershed Assessment Section
John G. Cargill, DNREC, Site Investigation & Restoration Section
Eli Patmont, AnchorQEA, formerly UMBC
AmeriCorps
Energizer Personal Care
Biohabitats
Frazier’s Restaurant
Brightfields
Interfaith Mission
City of Dover
Meadville Land Services, Inc.
Colonial Investment & Management Company
Pinelands Nursery, Inc.
Delaware National Estuarine Research Reserve
Portadam, Inc.
Delaware Office of Management and Budget
Ransome Rents
Delaware Representative Darryl Scott
Sediment Solutions
Delaware Senator Brian Bushweller
Silver Lake Commission
DNREC Office of the Secretary
Sussex County Conservation District
DNREC Division of Fish & Wildlife
Sussex County Correctional Boot Camp
DNREC Division of Parks & Recreation
US Army Corps of Engineers
DNREC Division of Waste & Hazardous Substances
VOLUNTEERS, VOLUNTEERS, VOLUNTEERS!
DNREC Division of Water
Wistar Equipment, Inc.
DNREC Division of Watershed Stewardship (esp.
the Shoreline and Waterway Section)
Page 27
On May 23, 2018, DWS staff and DWHS Director Marjorie Crofts, along with assistance from City of
Dover staff, completed a supplemental clean‐up and planting of the Mirror Lake wetland and adjacent
buffer. The activities were organized by DWS staff after an April 30, 2018 meeting with Senator
Bushweller, during which he expressed dissatisfaction with the overall appearance of the wetland.
Approximately 25 participants removed invasive plant species, last year’s senesced plant material, and
trash. To enhance the appearance, an additional 120 flowering wetland plants were planted amongst
the existing native plants. This effort will further increase the wetlands ability to improve water quality
and provide valuable wildlife habitat. Staff discussed the potential need to make this cleanup and
annual exercise based upon the location of the wetland at the gateway to historic downtown Dover.
DWS staff plan to meet with City of Dover staff to formulize a maintenance agreement for the project,
as well. Some photos from the clean‐up are attached.
.