Construction Code Appeals Committee Minutes
Construction Code Board of Appeals. Mar 24, 2016.
This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
Page 1
CONSTRUCTION CODE APPEALS COMMITTEE
The Construction Code Appeals Committee meeting was held on March 24, 2016 at 4:15 p.m. with
Chairman Sudler presiding. Members present were Mr. Lewis and Mr. Koenig.
AGENDA ADDITIONS/DELETIONS
By unanimous consent, the agenda was adopted as presented.
Reconsideration of Appeal of Requirement for Places of Assembly to be Sprinklered
(Chapter 46 - Fire Prevention and Protection, Article IV - Public Occupancies, Section 46-162 -
Sprinkler Requirements) - 518 and 524 South Bay Road (Proverbs 356 Properties, LLC)
The Construction Code Appeals Committee previously considered this matter during their meeting
of February 23, 2016, and no action was taken by the Committee.
Mr. Timothy Mullaney, Fire Marshal, advised members that on March 14, 2005, the City adopted
the sprinkler requirements in Chapter 46-162 of the Dover Code in an effort to make public
assemblies safer. He explained that the new requirements were more stringent than those mandated
by the National Fire Protection Association (NFPA) at that time. Mr. Mullaney noted that he had
not been working in the Fire Marshal’s Office when the new requirements were introduced, and this
decision was made by Mr. David Truax, former City of Dover Fire Marshal. Mr. Mullaney indicated
that the intent was to get water on fires more quickly to save lives and ensure that people in public
assemblies with large occupant loads would be able to exit safely. He noted that the City of Dover
Fire Department is a volunteer organization. Mr. Mullaney indicated that, as Fire Marshal, he
supported the requirements, stating that he deals with fire protection and places with large
occupancies on a daily basis, and sprinkler systems are needed to allow occupants to exit facilities
under their protection.
In response to Mr. Lewis, Mr. Mullaney stated that the building does not currently have a sprinkler
system.
Noting that this business had changed hands multiple times since the Code amendment
took effect in 2005, Mr. Lewis questioned why the Code had not been enforced. Responding,
Mrs. Ann Marie Townshend, Director of Planning and Community Development, indicated that
when ownership had changed previously, the building remained a restaurant. She explained that
there had been no change in the occupancy classification and no major renovations; therefore,
nothing in the Code would have triggered the requirement for Code compliance. In the current case,
the use would change from a restaurant to a different occupancy classification and there would be
renovations, both of which would trigger enforcement of the Code.
Mr. Sudler asked if this was a non-conforming use or if the property had been grandfathered.
Responding, Mrs. Townshend advised that when the building became a restaurant, a sprinkler system
was not required. It was continuously used as a restaurant, so the type of use did not change.
Mrs. Townshend noted that when an occupancy classification is changed or modifications are made
to a building, the new requirements come into effect. She noted that although the term
“grandfathered” is not typically used, this was essentially the case. Mrs. Townshend advised that
the building had been under the old regulations until there were significant changes to the building
and the type of use.
Page 2
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 2
Mr. Evan Smith, owner of the properties at 518 and 524 South Bay Road, asked if the sprinkler
requirement was due to a change of use or building construction. Responding, Mrs. Townshend
stated that both were factors.
Mr. Sudler stated his understanding that an upgrade of 50% would require that a property be brought
up to Code.
Mr. Smith asked what would happen if the property remained in the state in which he bought it.
Responding, Mr. Sudler explained that the change in use would also make him accountable to the
current Code.
Mr. Lewis expressed concern that the restaurant did not have a sprinkler system when it was open.
Mr. Sudler noted that during the Construction Code Appeals Committee meeting of
February 23, 2016, there had been discussion about construction measures that could be
implemented or substituted for the sprinkler system. He stated that a legal opinion had been sought
and Deputy City Solicitor William Pepper indicated that the City would not be liable if a waiver were
granted and a fatality occurred, and this liability would be on Mr. Smith’s insurance provider.
Mr. Sudler expressed his opinion that, from the City’s perspective, this was the major concern, apart
from the Code.
In response to Mr. Sudler’s request for his input, Mr. Gregory Akers, Chief Building Inspector,
advised that there was a change in the occupancy classification from A2, which includes banquet and
night clubs, restaurants, taverns, and bars, to A3, which has five (5) sub-categories of assembly. As
result, the existing building is required to meet the minimum requirements for the new occupancy
class. Mr. Akers advised that the proposed construction exceeded 50% of the aggregate floor area
and it was proposed to locate an apartment above the funeral parlor. He informed members that the
engineer had demonstrated the flame spread ratings and different materials for separation between
the floors on the contract documents. Mr. Akers stated that staff makes people aware of construction
alternatives as opposed to sprinkler systems. He felt that such an alternative would be achievable;
however, he stated that nine (9) times out of ten (10), a sprinkler system will prevail due to cost. Mr.
Akers explained whatever is not done with sprinklers must be made up for with non-combustible
materials, and this presents challenges, for example, fire-rated plywood is much more expensive than
regular plywood. He indicated that if the engineer was able to present a plan that is equal to a
sprinkler system, this could be considered; however, this would not change the Code.
Mr. Scott Koenig, City Manager, questioned if the sprinkler system would be required if the
occupancy load was 149. Responding, Mr. Akers stated that the Code indicates that all new indoor
places of assembly with an occupant load of 150 persons or greater require a sprinkler system.
Mr. Davidson stated, to his recollection, that their model was based on an occupancy of 220 on the
first floor.
Page 3
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 3
Mr. Koenig noted that Mr. Davidson had indicated that the funeral home would possibly be occupied
by 229 people once per day during the previous meeting.
Mr. Koenig questioned if the occupancy load was the only factor driving the sprinklering of the
building or if the 50% renovation issue was also an issue. In response, Mr. Akers indicated that both
factors were in play. He advised that the Code states that places of assembly shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA #13 when the following
apply:
1) All new indoor places of assembly with an occupant load of 150 persons or
greater.
2) Any interior renovations of 50 percent or more to an existing place of assembly
with an occupant load greater than 150 persons.
3) Any additions or increase in interior size to an existing place of assembly that
would create an occupant load of 150 persons or greater.
Mr. Akers noted that this building would change from occupancy class A2 to A3 and the renovations
would exceed 50%.
Mr. Mullaney advised that staff typically goes by the information presented to the City from an
architect that indicates the amount of space and the calculations, and staff must adhere to the
requirements presented in the Code.
Mr. Akers indicated that occupancy is based on calculations, not what it is stated to be.
In response to Mr. Sudler, Mr. Smith stated his belief that there are four (4) or five (5) funeral homes
in Dover.
Mr. Sudler questioned if any of these funeral homes had caught fire in the last two (2) to three (3)
years. Responding, Mr. Mullaney stated that he did not know if the Dover Fire Department had
responded to fires at these locations but could check records. He stated that he was aware of two (2)
funeral homes that were sprinklered.
Mr. Sudler questioned the likelihood of a fire in a funeral home. Responding, Mr. Mullaney
indicated that this is a “what if” question that he could not answer. He believed that the last fire at
a funeral home in Delaware had occurred in Lewes.
Mr. Jim Davidson, Fire Protection Engineer, stated that most of the time he believes that sprinklers
are needed for public and life safety; however, after the Construction Code Appeals Committee
meeting of February 23, 2016, he performed calculations on probability and occurrence.
Mr. Davidson stated that the NFPA indicated there were 495,000 fires in the United States each year
between 2007 and 2013, only 70 of which were in funeral homes. This equated to a probability of
one (1) in 7115. Mr. Davidson indicated that in a real-life situation, this would occur just between
the probability of an individual being struck by lightning in their lifetime and the probability of
Page 4
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 4
knowing someone who is struck by lightning. The probability would be slightly more likely than
an individual being accidentally shot by a firearm or dying in an air or space transportation vehicle
accident. Mr. Davidson noted that the possibility of looking into smoke detection systems had been
discussed, and he proposed a Very Early Smoke Detection Apparatus (VESDA) system, which is
used in very high-end, smoke sensitive environments. He indicated that with this system, a laser is
put in a cloud chamber, counts the number of smoke particles, and sounds an alarm. Mr. Davidson
indicated that the VESDA is very accurate and is nearly false alarm proof. He explained that in
smoke obscurity, most smoke detectors work at 2% obscuration per foot; however, the VESDA
detector operates at 0.002% obscuration per foot. Mr. Davidson advised that the device would sound
a fire alarm before smoke can be seen and is designed to start picking up the particulate of the
products of combustion just as an area is beginning to heat up, such as in wiring, insulation, or
fabric, by the scientific principles of a Wilson cloud chamber. He informed members that when
systems are used side by side, a VESDA detector can sound an alarm three (3) minutes before a
smoke detector and five (5) minutes before a sprinkler head goes off, because a sprinkler head needs
to have heat up at the ceiling and a smoke detector needs to see the smoke. Mr. Davidson stated that
the VESDA system has a small pipe hidden behind construction with a small blower motor that
sucks air samples from all points in the building into its monitoring system. It actively sees the
products of combustion and ensures that it is sampling all of the air and is not waiting for the air to
get up into the detector.
In response to Mr. Smith regarding how quickly the building could be evacuated, Mr. Davidson
advised members that modeling indicated that it would take 1.6 minutes to evacuate 150 people and
2.0 minutes to evacuate 220 people.
Responding to Mr. Mullaney regarding whether he had assumed in the modeling that all occupants
were capable of self-preservation, Mr. Davidson indicated that he did make this assumption;
however, he reduced the number of feet per second that NFPA calls for by 80% due to the possibility
of elderly people. He had assumed that people would go out more slowly than in a standard NFPA
analysis.
Mr. Mullaney questioned if Mr. Davidson could run an analysis that included a percentage of people
not capable of self-preservation. Responding, Mr. Davidson indicated that the term “not capable of
self-preservation” refers to people who cannot get out. Mr. Mullaney indicated that he was interested
in people in wheelchairs who would need to be pushed out by someone else, and Mr. Davidson
stated that this could be done. He advised that wheelchairs would slow down egress; however, he
thought, as an engineer, that the VESDA system would give people very early warning to look for
the problem.
Mr. Mullaney indicated that staff had not seen a VESDA system in the City; therefore, he was not
familiar with it. Mr. Davidson advised that the system was developed by the National Aeronautics
and Space Administration (NASA) and was used to monitor space capsules on the ground to provide
the earliest possible warning. He indicated that it was now being used in juvenile detention centers
Page 5
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 5
because sprinklers are not allowed in the sleeping quarters of these facilities since the Federal
Correctional Institute had stated that water on juveniles is an unusual punishment. Mr. Davidson
stated that the Delaware County Juvenile Detention Center in Media, Pennsylvania removed
sprinklers and installed VESDA systems. He explained that they are fairly new, have been used
since the mid-1970s or early 1980s, and are getting better. Mr. Davidson indicated that these
systems are becoming more cost effective and more widely used.
Mr. Smith believed that the Code was very broad and used with a wide ink brush, noting that the Fire
Marshal does not have the ability to look at individual situations and make a determination. He felt
that the cost of the sprinkler system outweighed its life safety. Mr. Smith indicated that the sprinkler
system would not alert anyone to the presence of a fire since, once the smoke detector goes off and
everyone is alerted, people will have evacuated the building before the sprinkler system activates.
Mr. Smith advised that he was investing his money and trying to be a good neighbor. He felt that
he was being stopped by Code regulations that require him to install something on his property, and
no one from the City was trying to assist him to figure out a variance to make sure people are safe
and also open his business and be a blessing to the residents of Dover.
Mr. Mullaney stated that staff had met with Mr. Smith plenty of times and had advised him early on
that this needed to be looked into. When City staff were invited to come to Mr. Smith’s property to
walk through it with Mr. Smith and the individuals who were representing him, Mr. Smith’s architect
stated that he had missed this requirement. Mr. Mullaney understood what Mr. Smith had stated
about being tied to meeting the requirement; however, he believed that the opportunity to figure this
out early on was presented to the people involved.
Mr. Smith stated that they had met early on, when a walkthrough was done and the use of the
property was explained. He noted that the need for a smoke detector or sprinkler system was never
mentioned, and that a witness now present had been with Mr. Smith and could attest to this. What
was mentioned was that there would probably not be a need, not that there would be a need or that
it had to be assessed. Mr. Smith advised that the meeting that City staff had with the contractor and
Mr. Davidson was months after the original meeting, and that was when the sprinkler system and
whether they had missed its requirement came up in the conversation.
As the plans reviewer, Mr. Akers advised that the sprinkler requirement was mentioned twice on the
corrections list with the first and second set of documents that were submitted, and it was also stated
during two (2) different meetings onsite; however, it never appeared on the drawings. Mr. Akers
stated, with respect, that if what Mr. Smith was saying were true, the sprinkler system would be on
the drawings and the current meeting would not be held. Mr. Akers agreed with Mr. Smith’s point
regarding the broad brush in terms of how the Code reads today; however, he stated that neither Mr.
Akers nor Mr. Mullaney can change the Code.
Responding to Mr. Sudler regarding the categories of assembly in the Code, Mr. Akers stated that
the original Code addressed four (4) specific occupancy classes: 1) dance halls, 2) discotheques,
Page 6
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 6
3) night clubs, and 4) assembly occupancies with festival seating. He noted that the Assembly 2
category now covers those four (4) classes. Mr. Akers explained that a funeral home would not fall
into any of these original Code categories. He stated that the modified Code covers all assembly
occupancies, whether a church, funeral home, or restaurant, and simply specifies assembly.
Mr. Akers advised that current Code has five (5) categories and approximately 56 sub-categories
for assembly.
Responding to Mr. Lewis, Mrs. Townshend stated that an occupancy of 149 or below would be
exempt from the sprinkler requirement.
In response to Mr. Davidson, Mr. Mullaney stated that the threshold under the NFPA code and State
fire regulations is 300.
Mr. Akers stated that the Dover Code had cut this figure in half to save more lives.
Mr. Davidson noted that the International Fire Code and International Building Code both specify
the use of sprinklers for an occupancy of 300; however, the City of Dover had changed this to 150.
He stated that in today’s Code, the four (4) specific original classifications had been lowered to an
occupancy of 100 in the International Building Code and the NFPA 101. Mr. Davidson advised that
if the City went back to the national standards, church social halls and meetinghouses would not be
included in the same assembly uses that specify an occupancy of 150.
Mr. Davidson stated that, by national consensus, standards in the new codes had been changed due
to concerns regarding the original four (4) categories. He noted that up-to-date codes require
sprinklers for places of assembly with an occupancy load of 100 or more and include such uses as
dance halls, bars, and certain restaurants and places where there is consumption of alcohol. He
noted that the new code was more stringent for these specific categories, which are the highest life
hazard categories due to people present who are cognitively unaware of what is going on around
them. Mr. Davidson noted that attendees at a fraternity house party who are fine at 9:00 p.m. may
be falling off a roof at 2:00 a.m. because they think they can fly. He recalled that Mr. Truax had
questions regarding certain party assembly occupancies in Dover and was worried about venues that
were not technically set up for that type of thing. The limit of 150 was deemed an easy solution to
address them. Mr. Davidson noted that this was a long time ago, and Mr. Mullaney concurred.
Responding to Mr. Lewis regarding how much work had been completed on the project, Mr. Smith
stated that it had been completely demoed, a brand new roof had been installed, plumbing had been
started, and some framing had been done on the interior.
In response to Mr. Mullaney regarding internal work, Mr. Smith indicated that the demo, framing,
plumbing, and electrical work had been done. He noted the property had sat for a long time but was
now secure and had an alarm system, so that no one would be squatting on the property.
Page 7
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 7
In response to Mr. Sudler regarding the percentage of construction that had been completed,
Mr. Smith indicated that, from a dollar perspective, he had made a significant investment in a
building that sat in Dover for a while and was a public nuisance. He estimated that roughly 50% had
been completed.
Mr. Lewis stated his understanding that there would be an upstairs apartment. Responding,
Mr. Smith indicated that there would not be such an apartment.
Stating his understanding of cost issues, Mr. Lewis questioned if there could be a reasonable
compromise between Mr. Smith and the City. Responding, Mr. Smith advised that after the first
meeting regarding his appeal, they contacted two (2) sprinkler system companies, Bear Industries,
Inc. and Sobieski Life Safety, to get an idea of the cost. The cost to install equipment inside the
building would be $20,000 - $25,000, which Mr. Smith indicated was relatively inexpensive;
however, the cost to dig from the property to the water line, obtain the permits, and install the line
would be approximately $100,000 - $140,000.
In response to Mr. Lewis, Mr. Smith stated that the water would come directly from the City.
Responding to Mr. Lewis, Mr. Sudler reiterated that Mr. William Pepper, Deputy City Solicitor, had
indicated that if the project proceeded without the sprinkler system, the City would not be liable if
anything were to occur. Mr. Smith’s insurance provider would be liable. He was unsure if this
opinion was in writing, but stated that this could be verified with Mrs. Traci McDowell, City Clerk.
Mr. Koenig stated that the City Solicitor had indicated that the City would not incur any additional
liability. This did not mean that the City could not be sued. If the Code were waived, the City would
not be incurring additional liability.
Mr. Koenig questioned what permits had been issued for this property to date and what work those
permits covered. In response, Mr. Akers indicated that, to his knowledge, a demolition permit had
been issued to allow the property owner to get started on the project and to allow roof repairs.
Mr. Koenig questioned if this would include the replacement of a roof. Responding, Mr. Akers
indicated that it would if this was part of the repairs.
Mr. Koenig expressed concern about the statement that 50% of the work had been done, which led
him to believe that more work had been done than had been authorized by the City. Referring to the
City of Dover Building Permit Application for the property, Mr. Koenig noted that the permit was
dated September 24, 2015, so this had been an issue for some time. He noted that during the
previous meeting, Mr. Smith had indicated that his attorney contacted the City, and the engineer did
not get involved until the permits were submitted. Mr. Koenig did not believe that the City was in
a position to comment about something that was or was not needed on the property because he did
not see how those conversations actually took place. He stated that Mr. Smith indicated that his
Page 8
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 8
lawyer called the City before the building was purchased; however, was unsure who the lawyer
talked to. Mr. Koenig reiterated that this project had been pending for a long time.
Mr. Koenig advised that the project could be done with an occupancy load of under 149 people
without a requirement to sprinkler the building. The architect would have to lay out the interior of
the building so that the load would equate to 149 people or less. Mr. Koenig realized that this was
expensive and that people do not like the Code in place; however, he stated that the Code had been
adopted and staff had been working with it for the past 11 years. He thought that there were options
for the applicant to reduce the occupant load of the building and conduct business.
Mr. Mullaney stated that he had received a phone call from a contractor for the project, which
typically occurs when contractors are trying to determine from the City what is needed when they
are bidding jobs. Mr. Mullaney indicated that an option would be to research some type of tank
system, stating that these types of systems are called 13R and 13D and could be better explained by
the project engineer.
Mr. Davidson noted that they would have to ask the City for an equivalency if this approach was
used.
Mr. Mullaney indicated that they would have to ask him, as Fire Marshal, if he would support a tank
system. He explained that this is basically an onsite tank that provides a certain amount of water
pressure and water to the sprinkler system to allow sufficient time for people to exit. Mr. Mullaney
noted that this would not have lines running directly from the outside, which would reduce the cost.
He stated that he had told the contractor that he was willing to explore this as an option if Mr. Smith
was willing to do so. Mr. Mullaney advised that this type of sprinkler system is used more in
residential buildings and, although it is not 100% what the Code says, it is a type of sprinkler system
that he believed he had the leeway to allow in order to work with the owner to make sure that he
would still be abiding by requirements. He indicated that this approach would be a version of
NFPA 13 and would provide fire suppression in the building.
Mr. Davidson asked if Mr. Akers, as the engineer and building code specialist, agreed with the
concept of allowing the use of a UL-listed 13R system, with the tank size equivalent to a NFPA 13
light hazard quick response head. He stated the desire to confirm the concept before putting
everything on paper and giving it to Mr. Mullaney and Mr. Akers. Responding, Mr. Akers stated
that if the Fire Marshal was willing to accept this, he would support him 100%.
Mr. Smith stated that he did not understand why he had to come to an appeals meeting to find out
that there was something equivalent that he could do. Responding, Mr. Davidson indicated that
technically Mr. Mullaney’s hands are tied until the Committee gives him the approval to do what is
called an equivalent.
Page 9
CONSTRUCTION CODE APPEALS COMMITTEE
MEETING OF MARCH 24, 2016 PAGE 9
Mr. Mullaney stated he was contacted by the contractor after the first appeal and Mr. Mullaney had
no knowledge that the appeal would be reconsidered.
Mr. Sudler explained that the reason that this matter was reconsidered was because the Code states
that the Construction Code Appeals Committee has three (3) members and only two (2) members
were present at the previous meeting. As Chairman, Mr. Sudler felt this was unfair to Mr. Smith.
Mr. Koenig questioned if the applicant could submit this equivalent outside of the Code appeals
process. Responding, Mr. Mullaney indicated that architects know the parameters of the Code and
can ask for this. He stated that he had received many similar requests.
Mr. Koenig questioned if the Committee had to vote to uphold Mr. Mullaney’s decision or override
his decision for an equivalent. Mr. Mullaney indicated that he did not believe so.
Mr. Lewis questioned if authorization was needed from a higher power. Responding, Mr. Mullaney
stated that a fire suppression system is required and the equivalent discussed would be a type of fire
suppression system.
In response to Mr. Lewis as to whether he would be in agreement with the alternative, Mr. Smith
stated that he would; however, he indicated that he did not know how much it would cost, which was
important to him.
Mr. Sudler asked whether Mr. Smith would like the Committee to make a decision today regarding
this matter or if he would work with the Fire Marshal on suppression without knowing the cost.
Responding, Mr. Smith stated that he wanted the Committee to make a decision today.
Mr. Sudler moved to waive the Code requirement for a sprinkler system. The motion failed for lack
of a second.
Mr. Lewis moved for adjournment, seconded by Mr. Sudler and unanimously carried.
Meeting adjourned at 5:03 p.m.
Roy Sudler, Jr.
Chairman
RS/JS/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Misc-Minutes\CONSTRUCTION CODE APPEALS COMMITTEE\03-24-2016 Construction Code Appeals Committee -
MR.wpd