CITY OF DOVER PLANNING COMMISSION
AGENDA
Monday, March 21, 2016 – 7:00 P.M.
City Hall Council Chambers
15 Loockerman Plaza, Dover, Delaware
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF AGENDA
ADOPTION OF MINUTES OF REGULAR MEETING of February 16, 2016
COMMUNICATIONS & REPORTS
1) Reminder: The next Planning Commission regular meeting is scheduled for MONDAY,
April 18, 2016 at 7:00pm in the City Council Chambers.
2) Update on City Council Actions
3) Update on Planning activities
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval:
A. S-14-08 Woodland Tree Clearing Plan of 560 Bay Road – Request for one year extension
of Planning Commission approval granted on April 21, 2014 to the Site Development
Plan to permit the clearing of approximately 7.45 acres +/- of trees (woodland) on a 12.67
acre +/- parcel. This included approval of the waiver request to permit the tree clearing to
exceed 50% of the woodland on the property at 560 Bay Road and to accept the
Woodland (Tree) Mitigation Plan to create a minimum of 4.65 acres of new woodland at
an off-site location. No buildings or paving were proposed. This is associated with the
Woodland Tree Mitigation Plan at the Anne McClements Woodland Tract (Fork Branch
Nature Preserve) previously approved by the Planning Commission on April 19, 2010
with Application S-10-03 South Dover Plaza. The Woodland Mitigation Plan was
implemented and completed by October 2013. The property is zoned C-4 (Highway
Commercial Zone). The property is located on the southwest side of Bay Road. The
owner of record is S H E Holdings, LLC. Property Address: 560 Bay Road. Tax Parcel:
ED-05-077.00-01-10.00-000. Council District 2.
2) Revised Plan Information:
A. C-13-11 Dover Christian Church at 1738 Forrest Avenue – Information on Revisions to
Conditional Use Site Plan for construction of one story 9,600 SF place of worship
(church building) and associated site improvements. The proposed Revisions consist of
reduction of building size, reduction of number of parking spaces, reduction of
impervious coverage, revision to type of stormwater management facility and revisions to
building architecture and materials. The existing residence on the property is proposed
Page 2
City of Dover Planning Commission Agenda
Public Hearing: March 21, 2016
Page 2 of 4
for demolition. The property is 1.5576 acres and is zoned R-10 (One Family Residential
Zone) and subject to the COZ-1 (Corridor Overlay Zone). The property is located on the
south side of Forrest Avenue and west of Dover High Drive. The owner of record is
Dover Christian Church, Inc. Address: 1738 Forrest Avenue. Tax Parcel: ED-05-
075.00-01-04.00-000. Council District 1. The Planning Commission granted conditional
approval of the Conditional Use Site Plan on October 21, 2013 and a one year extension
on August 17, 2015; Final Plan approval is still pending.
NEW BUSINESS
1) S-16-04 Dover Behavioral Health Systems: Phase I, 4-Bedroom Addition at 725 Horsepond
Road: Waiver Request – Review and Consideration of a Waiver Request for parking
reduction as associated with the Administrative Site Plan for construction of a 1,400 +/- sq.
ft. addition at the rear of the existing building to consist of four bedrooms. This
Administrative Site Plan review will precede a future Site Plan Application for a 9,800 sq. ft.
Phase II addition. The project is located on the east side of Horsepond Road north of Lafferty
Lane and is adjacent to the City Line. The property is zoned IO (Institutional and Office
Zone) and is subject to the AEOZ (Airport Environs Overlay Zone). The owner of the
property is UHS of Dover LLC. Tax Parcel: ED-05-078.00-01-08.00-000. Council District 2.
NEW DEVELOPMENT APPLICATIONS
1) AX-16-01 Lands of Capitol Cleaners & Launderers, Inc. at 1102 South State Street – Public
Hearing and Review for Recommendation to City Council of an Annexation Request and
Rezoning Request for one parcel of land totaling 6,331 S.F. +/- located at 1102 South State
Street. The property is currently zoned BG (General Business District) in Kent County. The
proposed zoning for the property is C-2A (Limited Central Commercial Zone). The property
is located west of South State Street and north of State Street Road and South DuPont
Highway. The annexation category according to Dover’s 2008 Comprehensive Plan is
Category 1: High Priority Annexation Area and the land use classification is Commercial.
The owner of record is Capitol Cleaners & Launderers, Inc. Address: 1102 South State
Street. Tax Parcel: ED-00-086.05-01-46.02-000.
2) C-16-03 Duplexes at W. Reed Street and South Kirkwood Street – Public Hearing and
Review of a Conditional Use application to construct three duplex buildings for a total of six
dwelling units. The project includes a Minor Subdivision Plan to reconfigure the existing lot
fronting on Reed Street and the two lots fronting on South Kirkwood Street into six lots
fronting on Reed Street. Each of the six main lots is proposed to be between 1,673 S.F. and
2,345 S.F. in area. The total property area is 10,781 S.F. (0.247 acres) and is zoned RG-1
(General Residence Zone). The property is located on the east side of South Kirkwood Street
just south of Reed Street. The owner of record is Mautiste Investment Group. Property
Addresses: 420 W. Reed Street, 105 South Kirkwood Street, and 107 South Kirkwood Street.
Tax Parcels: ED-05-076.12-02-65.00-000, ED-05-076.12-02-64.00-000, and ED-05-076.12-
02-63.00-000. Council District 4. This application is associated with Application V-16-01
variance requests related to RG-1 bulk standards as approved by the Board of Adjustment on
February 17, 2016.
3) US-16-01 Delaware Technical Community College Comprehensive Sign Plan – Public
Hearing and Review of a Unified Comprehensive Signage Plan application to amend the
Page 3
City of Dover Planning Commission Agenda
Public Hearing: March 21, 2016
Page 3 of 4
applicant’s existing approved Signage Plan (US-13-02) to permit additional banners totaling
418 S.F., to be placed on multiple buildings on the Delaware Technical Community College
campus. The property is zoned IO (Institutional and Office Zone). The property is located on
the west side of North DuPont Highway between West Denneys Road and Scarborough
Road. The owner of record is State of Delaware - Delaware Technical & Community
College. Address: Delaware Tech Terry Campus, 100 Campus Drive. Tax Parcel: ED-05-
057.00-01-01.00-000. Council District 3. This application is associated with US-13-02
approved by the Planning Commission on December 16, 2013 with Final Plan approval on
January 14, 2015.
4) US-16-02 Winner Ford Comprehensive Sign Plan – Public Hearing and Review of a Unified
Comprehensive Signage Plan application which would supersede the applicant’s existing
approved Signage Plan (US-02-01) and permit the construction and implementation of new
signage for multiple buildings of the motor vehicle sales and service facility. The new
signage would consist of a pylon sign, wall signs, and post and panel directional signs. The
subject property is a total of 9.94 acres +/- and is zoned C-4 (Highway Commercial Zone).
The property is located on the east side of South DuPont Highway just to the north of Public
Safety Boulevard. The owner of record is 591 DuPont Highway LLC. Property Address: 591
South DuPont Highway. Tax Parcel: ED-05-077.00-01-12.05-000. Council District 2. This
application will supersede US-02-01 approved by the Planning Commission on January 22,
2002.
5) S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road –
Public Hearing and Review of a Site Development Master Plan application to permit
construction in six phases consisting of three building additions and a parking lot expansion.
The building additions would total 20,857 S.F. +/-. The Plan also proposes demolition of a
1,485 S.F. +/- building near the western edge of the site. The total building area on site after
completion of the Plan would be 43,307 S.F +/-. The property is zoned IO (Institutional and
Office Zone) and is subject to the COZ-1 (Corridor Overlay Zone). The property is located
on the west side of McKee Road south of College Road. The owner of record is Grace
Presbyterian Church, Inc. Address: 350 McKee Road. Tax Parcel: ED-05-067.14-01-70.01-
000. Council District 4. Waivers Requested: Elimination of Opaque Barrier Fence
Component and Partial Elimination of Curbing. This application is associated with
Application V-15-15 a variance request to exceed the maximum number of parking spaces as
approved by the Board of Adjustment on December 16, 2015.
6) S-16-07 The Arbors Senior Garden Apartments at 1051 College Road – Public Hearing and
Review of a Site Plan application to permit construction of a 48-unit senior garden apartment
complex. The project consists of a proposed three-story 55,350 S.F. residential building and
associated site improvements, including construction of an improved public street (Senior
Way) on existing right-of-way connecting College Road and Topaz Circle. The parcel is
divided into two discontinuous areas on either side of the right-of-way and totals 3.77 acres.
It is zoned RG-2 (General Residence Zone).The property is located on the north side of
College Road and west of McKee Road. The owner of record is Shree Ganesh LLC. Address:
1051 College Road. Tax Parcel: ED-05-067.00-01-35.03-000. Council District 1. Waivers to
be Requested: Partial Elimination of Curbing. Project includes review of an Active
Recreation Plan. A previous Conditional Use Site Plan C-10-02 The Arbors Condominiums
was reviewed by Planning Commission in August 2010 but has since expired.
Page 4
City of Dover Planning Commission Agenda
Public Hearing: March 21, 2016
Page 4 of 4
7) MI-16-02 Text Amendment: Keeping of Domestic Animals and Keeping of Chickens–
Public Hearing and Review for Recommendation to City Council on a series of Text
Amendments to Zoning Ordinance, Article 3 - District Regulations, Section 1.15d. The
proposed Ordinance revisions would amend the accessory uses of the One Family Residence
Zones regarding the provisions of keeping of domestic animals and add Article 3, Section
1.15e pertaining to the keeping of chickens and the associated restrictions. Staff Substitute #1
for Ordinance #2016-01. The Public Hearing and Final Reading before City Council on
April 11, 2016.
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE
SESSIONS.
Posted Agenda: posted x
Page 5
CITY OF DOVER PLANNING COMMISSION
February 16, 2016
The Regular Meeting of the City of Dover Planning Commission was held on Tuesday, February
16, 2016 at 7:00 PM with Chairman Mr. Tolbert presiding. Members present were Mr. Holden, Mr.
Cregar, Colonel Welsh, Mr. Holt, Mr. Baldwin, Dr. Jones, Ms. Still and Mr. Tolbert. Mr. Ambruso
was absent.
Staff members present were Mrs. Ann Marie Townshend, Mr. Jason Lyon, Mr. Bill Cook, Mrs.
Dawn Melson-Williams, Mrs. Tracey Harvey, Mr. Eddie Diaz and Mrs. Mullaney. Also present
were Mr. Jack Kling, Mr. Michael Braun, Ms. Donna Bullock, Mr. William Grimes, Mr. Tolano
Anderson, Mr. John Sigler, Mr. Sean Keblen, Mr. Gregory Moore, Mr. Bob MacLeish, Mr. Steve
Hutchison and Mr. David Kuklish. Speaking from the public was Mr. William Heinz.
APPROVAL OF AGENDA
Colonel Welsh moved to approve the agenda as submitted, seconded by Mr. Holt and the motion
was unanimously carried 8-0 with Mr. Ambruso absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF JANUARY
19, 2016
Ms. Still moved to approve the Planning Commission Meeting minutes of January 19, 2016,
seconded by Dr. Jones and the motion was unanimously carried 8-0 with Mr. Ambruso absent.
COMMUNICATIONS & REPORTS
Mrs. Townshend stated that the Planning Commission Quarterly Workshop is scheduled for
Wednesday, February 17, 2016 at noon in the City Hall Conference Room. If you can let Staff
know if you will be attending that way they can plan accordingly.
Mrs. Townshend stated that the next Planning Commission meeting is scheduled for Monday,
March 21, 2016 at 7:00pm in the City Council Chambers.
Mrs. Townshend provided an update on the regular City Council and Utility Committee meetings
held on January 25 & 26, 2016 and February 8 & 9, 2016.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Townshend presented the audience information on policies and procedures for the meeting.
OLD BUSINESS
1. Requests for Extensions of Planning Commission Approval: None
NEW DEVELOPMENT APPLICATIONS
1. MI-16-01 Comprehensive Plan Amendments 2016 – Public Hearing and Review for
Recommendations to City Council on a series of Amendments to the 2008 Comprehensive
Plan, as amended. The Amendments include consideration of the following: two requests
for amendment of Map 12-1: Land Development Plan to revise the Land Use Classification
1
Page 6
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
of properties as associated with rezoning application Z-16-02 and with rezoning application
Z-16-03, and a request for amendment of Map 12-1: Land Development Plan to revise the
Land Use Classification of properties associated with the Woodlands Area of Dover
International Speedway. Ordinance #2016-01. A Public Hearing and Final Reading are
scheduled for action before the City Council on March 14, 2016.
A. Consideration of Amendment to Map 12-1: Land Development Plan Map – Request for a
parcel located on the west side of New Burton Road and west of the railroad corridor to
revise the Land Use Classification from Residential Low Density to Industrial and Public
Utilities on Map 12-1: Land Development Plan Map. Property Addresses: 37.2 acres New
Burton Road & 1436 New Burton Road. This is associated with rezoning application Z-16-
02.
B. Consideration of Amendment to Map 12-1: Land Development Plan Map – Request for a
parcel located on the west side of South State Street south of Gooden Avenue to revise the
Land Use Classification from Residential Medium Density to Office and Office Parks on
Map 12-1: Land Development Plan Map. Property Address: 834 South State Street. This is
associated with rezoning application Z-16-03.
C. Consideration of Amendment to Map 12-1: Land Development Plan Map – Request for
properties owned by Dover International Speedway Inc. located east of Delaware Route 1 on
the north side and south side of Persimmon Tree Lane to revise the Land Use Classification
from Active Agriculture to Commercial. Property Addresses: 75 Pit Stop Lane and 599
Persimmon Tree Lane. This amendment is proposed to facilitate the consistent zoning of the
Woodlands Area, which is the location of the Firefly music festival.
Representatives: None
Mrs. Townshend stated that each year the City allows members of the public to request amendments
to the Comprehensive Plan. Typical, these are done in conjunction with Rezoning requests and Staff
also evaluates conditions to determine if Staff needs to also bring forward proposed amendments at
that time. The annual deadline for these applications is December 15th and there are two
applications this year and then one plan amendment being proposed by Staff. All of the
amendments for this evening are amendments to Map 12-1 which is the Land Development Plan
Map.
The first two are associated with Rezoning applications that are on this evening’s agenda. The
decision the Commission makes on the Comprehensive Plan amendment needs to also inform the
decision that they will make about that particular Rezoning application.
The first of these is a request to amend the Comprehensive Plan regarding a 37.2 acre parcel located
on the west side of New Burton Road, west of the railroad corridor. It would revise the Land Use
Classification from Residential Low Density to Industrial and Public Utilities. In this case, the West
Dover Connector has cut a pretty large squath through this Kesselring Farm which is a property that
again is currently zoned R-20 (One Family Residence Zone) and was depicted as Residential Low
Density in the Comprehensive Plan. The construction of the road and the associated right of way
does significantly change the character of the area and leaves this piece of land bound by the new
2
Page 7
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
road and the railroad tracks. It does make it certainly less desirable for residential development. The
request by this applicant is to amend the Land Development Plan Map to change it from Residential
Low Density to Industrial and Public Utilities.
The second of these requests is for a parcel of land located on the west side of South State Street,
south of Gooden Avenue. The request is to revise the Land Use Classification from Residential
Medium Density to Office and Office Parks. Again, when you look at that particular stretch of
South State Street you have the old Steele’s Pharmacy which is commercial and the immediately
adjacent property to the south is zoned RGO (General Residence and Office Zone) and is developed
as on office building. Additionally, what the Land Development Plan Map does not show is the
parcel located on Bradford Street; it’s the Medical Arts Building. While that shows as residential
land use on the Comprehensive Plan, it is zoned RGO (General Residence and Office Zone) and has
an office building on it. Again, in looking at the specific circumstances surrounding this property, it
is consistent with the land use pattern in the area. This Land Development Plan amendment is
associated with a Rezoning for that same property.
The third of the plan amendments is an amendment to the Land Development Plan Map to take
lands that are owned by Dover International Speedway located east of Route 1 on the north and
south side of Persimmon Tree Lane to revise the classification from Active Agriculture to
Commercial. We are currently in the process of working with Dover International Speedway to
annex the balance of the property where they have the festivals into the City. As you recall, there
were changes made to the RC (Recreational and Commercial Zone) that would specifically address
the festivals and the associated camping and other types of temporary events. They wanted to
change the Comprehensive Plan so that all of these properties can brought under the same zoning
for consistency with how it’s regulated. The Comprehensive Plan amendments are required under
State Law to go to the State under PLUS review. This did go to the State for PLUS review; they do
not have the comments in hand at this point. She does know at least what was conveyed to her
verbally is that they will probably have some caveats related to the change of the Speedway
property from Agricultural to Commercial in the Comprehensive Plan but she doesn’t have detailed
comments yet. She thinks their concern is principally about how it develops over time and at this
point it’s a festival and they want to make sure that we understand that if it is changed to
Commercial and rezoned accordingly that other things other than the festivals could happen there.
She thinks the way they structured the RC (Recreational and Commercial Zone) changes was in
anticipation of having all of the Speedway under one umbrella, all within the City and all under the
same zone so it’s all part of this Master Plan related to the Speedway. There are comments from the
other agencies, mainly standard comments.
Mr. Tolbert has indicated that he would like to recuse himself on any discussion or vote related to
the Speedway Plan Amendment. Typically in the past, they have held a public hearing on each and
after all of the public hearings they would make a motion on each so that it’s very clear how they
are voting on each of the amendments. They will be able to accept one, two or three of them but
they are not bound under one action.
Mr. Holden recused himself from Item C due to the fact that his employer has worked with the
applicant and also since it was initiated by Staff.
Mr. Cregar stated in looking at the proposed designation for the State Street property and he is
3
Page 8
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
looking at the individual yellow spot on the display map next to the commercial and the office;
should they not have looked at extending the amendment to include that property as well?
Responding to Mr. Cregar, Mrs. Townshend stated that the way they do it when it’s applicant
initiated they look specifically at that piece. She would say with the update the Comprehensive Plan
which they plan to work on next year that they need to look at that particular piece at that point.
Mr. Cregar stated that because they don’t have the comments regarding Dover Downs, he is curious
how they proceed with that because their comments may be important. Responding to Mr. Cregar,
Mrs. Townshend stated that they could certainly defer action on that specific item.
Mr. Cregar questioned if there were any Staff suggestions? Responding to Mr. Cregar, Mrs.
Townshend stated that she has been very open with the State Planning Office that this Plan
Amendment is very important to the overall way the City deals with the music festival. Staff
recognizes that when you zone something, other things can happen. She thinks, one the economy
isn’t such that anything is likely to happen in the near term but she also is not entirely sure that it
would be a detriment if something happened there as long as it was well planned.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Colonel Welsh moved to recommend approval to City Council for MI-16-01 Comprehensive Plan
Amendments 2016 Item A: Consideration of Amendment to Map 12-1: Land Development Plan Map
for a parcel located on the west side of New Burton Road to be changed from Residential Low
Density to Industrial and Public Utilities, seconded by Ms. Still and the motion was carried 8-0 by
roll call vote with Mr. Ambruso absent. Mr. Holden voting yes as the other land changes currently
in the surrounding area supports the conversion. Mr. Cregar voting yes, because of the way the
road configuration has cut that piece of property; it really is not logical for residential and he
thinks it meets what they would like to see for an industrial public utility area. Colonel Welsh
voting yes, it’s a good revision to the Land Use Classification as has been stated. Mr. Holt voting
yes, it’s a good use of the land and it works in well with the whole development there as far as
bringing it into the 20th century for the City of Dover. Mr. Baldwin voting yes, it conforms with the
newly constructed roadway in that area. Dr. Jones voting yes, for all of the aforementioned reasons.
Ms. Still voting yes, it’s an appropriate change to the Land Use Classification in light of all the
changes in that area. Mr. Tolbert voting yes, for all the reasons stated and it does maximize land
uses.
Ms. Still moved to recommend approval to City Council for MI-16-01 Comprehensive Plan
Amendments 2016 Item B: Consideration of Amendment to Map 12-1: Land Development Plan Map
for a parcel (834 South State Street) located on the west side of South State Street south of Gooden
Avenue to be changed from Residential Medium Density to Office and Office Parks, seconded by
Dr. Jones and the motion was carried 8-0 by roll call vote with Mr. Ambruso absent. Mr. Holden
voting yes, the slow conversion of land use in that area and also due to Staff and other advisory
comments. Mr. Cregar voting yes, as they look at updating the Comprehensive Plan they should
look at this property and several other properties along that area because of the nature of that area
has changed considerably. Colonel Welsh voting yes, because of the reasons previously stated. Mr.
Holt voting yes, because of reasons previously stated. Mr. Baldwin voting yes, for the
aforementioned reasons. Dr. Jones voting yes, she thinks it’s a good idea to move forward with the
4
Page 9
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
consistency with the land uses in that area. Ms. Still voting yes, in concurrence with all of the
previously mentioned reasons. Mr. Tolbert voting yes, he concurs with all of the statements made
concerning the approval of this part of the plan.
Colonel Welsh moved to recommend approval to City Council for MI-16-01 Comprehensive Plan
Amendments 2016 Item C: Consideration of Amendment to Map 12-1: Land Development Plan Map
for properties owned by Dover International Speedway Inc. located east of Delaware Route 1 on
the north side and south side of Persimmon Tree Lane to revise the Land Use Classification from
Active Agriculture to Commercial, seconded by Mr. Holt and the motion was carried 5-0 by roll
call vote with Mr. Holden and Mr. Tolbert recused, Mr. Cregar not voting and Mr. Ambruso absent.
Mr. Cregar abstained from voting only for the reason that he still does not feel comfortable going
ahead with this without the comments that the State would provide. It’s a big chunk of land; it has
the potential for a considerable amount of re-development at some point in time and he just feels
like he doesn’t want to vote in favor or against without having all of the pieces yet. Colonel Welsh
voting yes, he thinks it’s an appropriate land use and he thinks it will serve the City and Dover
Downs quite well. Mr. Holt voting yes, he thinks it’s a good use of the land and it will be a benefit
to Dover Downs. Mr. Baldwin voting yes, he thinks it’s an appropriate fit for the activities that will
be taking place there. Dr. Jones voting yes, for the aforementioned reasons and also based upon the
comfort level of Staff. Ms. Still voting yes, for the aforementioned reasons.
2. Z-16-02 Lands of Kesselring Company, LLC near New Burton Road: Rezoning from R-20
to IPM – Public Hearing and Review for Recommendation to City Council on a rezoning
application for a 37.2 acre ± parcel. The property is zoned R-20 (One Family Residence
Zone). The proposed zoning is IPM (Industrial Park Manufacturing Zone). The property is
located on the west side of New Burton Road and west of the railroad corridor and
surrounded by the right-of-way for the West Dover Connector. The owners of record are
Kesselring Company, LLC & Others and Larry Kesselring. Addresses: 37.2 acres New
Burton Road & 1436 New Burton Road. Tax Parcels: ED-05-085.00-01-07.00-000 and ED-
05-085.00-01-07.00-001. Council District 2. Ordinance #2016-03. Associated with request
(MI-16-01A) for Comprehensive Plan Amendment as a land use classification revision to
Map 12-1. A Public Hearing and Final Reading are scheduled for action before the City
Council on March 14, 2016.
Representatives: Mr. Jack Kling, Remax Horizons
Mrs. Townshend stated that this is a rezoning application for 37.2 acres of land on New Burton
Road. Again, this is associated with the first part of the Comprehensive Plan Amendment that the
Commission just recommended in favor of. This is a rezoning request to take the vacant land that is
left now caught between the road and the rail line from R-20 (One Family Residence Zone) to IPM
(Industrial Park Manufacturing Zone). The reasons are previously stated but it there are any
questions she would be glad to answer them.
Mr. Kling stated that he is here on behalf of the Kesselring family to answer any questions. They
made the request for rezoning of that property for obvious reasons. The bypass connector route
basically made it much more feasible as an industrial property than a residential property. At least
that was his opinion in the beginning and why it was brought before the Commission.
5
Page 10
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Holden moved the recommend approval to City Council for Z-16-02 Lands of Kesselring
Company, LLC near New Burton Road: Rezoning from R-20 to IPM due to the fact that the changes
in the area and changes in land use support the conversion and it would be a good use; residential
is not necessarily a good use anymore, seconded by Ms. Still and the motion was carried 8-0 by roll
call with Mr. Ambruso absent. Mr. Holden voting yes, due to Staff comments. Mr. Cregar voting
yes, for all of the previous reasons that were discussed with the change to the Comprehensive Plan
and due to Mr. Holden’s comments. Colonel Welsh voting yes, for all of the same reasons. Mr. Holt
voting yes, for the previous reasons discussed. Mr. Baldwin voting yes, for the reasons previously
discussed. Dr. Jones voting yes, for all of the same reasons. Ms. Still voting yes, for all of the same
reasons. Mr. Tolbert voting yes, for all of the same reasons; the recommendation is good for the
City.
3. Z-16-03 Lands of Michael W. & Winifred M. Braun at 834 South State Street: Rezoning
from R-8 to CPO – Public Hearing and Review for Recommendation to City Council on a
rezoning application for a 17,000 S.F. ± parcel. The property is zoned R-8 (One Family
Residence Zone). The proposed zoning is CPO (Commercial and Professional Office Zone).
The property is located on the west side of South State Street and south of Gooden Avenue.
The owner of record is Michael W. & Winifred M. Braun. Address: 834 South State Street.
Tax Parcel: ED-05-077.17-03-45.00-000. Council District 2. Ordinance #2016-04.
Associated with request (MI-16-01B) for Comprehensive Plan Amendment as a land use
classification revision to Map 12-1. A Public Hearing and Final Reading are scheduled for
action before the City Council on March 14, 2016.
Representatives: Mr. Michael Braun, Owner
Mrs. Townshend stated that this is a rezoning request that is associated with the Comprehensive
Plan amendment request that was just considered. This is for a 17,000 square foot piece of property
located at 834 South State Street. The request is to rezone the property from R-8 (One Family
Residence Zone) to CPO (Commercial and Professional Office Zone). She would go back to the
same reasons supporting the Comprehensive Plan amendment. She would also note that the house
on the property has been vacant for some time and has had some issues with the repair of it. The
conversion to an office could definitely be an improvement as you would have an investment in the
property that would detract from any of the nuisance that would be part of dealing with a vacant
building.
Mr. Braun stated that the comment that he was about to make was addressed by Mrs. Townshend.
That property has a number of physical characteristics that don’t make it particularly useful as a
residence and lend themselves to converting it to an office. Not only is the area changing, the
physical nature of the property itself sort of pushes towards a commercial operation.
Mr. Holden stated that he was curious what characteristics of the property other than the location
are changing the character of the neighborhood. Responding to Mr. Holden, Mr. Braun stated that
the kitchen is poorly laid out. It would not be useful as a kitchen; it would require a complete
renovation. Conversely, it’s fine for an office break room. The bathroom that would be for the two
6
Page 11
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
bedrooms on the second floor is off the kitchen meaning the occupants of that bedroom would have
to come down the stairs to the back of the house to access the bathroom. The bedrooms are small,
the closets are tiny, they would have to be expanded which would make the bedrooms even smaller
but they are fine in an office environment. Those sorts of things are what he sees as he looks at this
property.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Dr. Jones moved to recommend approval to City Council for Z-16-03 Lands of Michael W. &
Winifred M. Braun at 834 South State Street: Rezoning from R-8 to CPO, seconded by Ms. Still and
the motion carried 8-0 by roll call vote with Mr. Ambruso absent. Mr. Holden voting yes, due to
Staff comments and other discussion. Mr. Cregar voting yes, supporting the change to the
Comprehensive Plan that was also supported and the nature of the area and how it’s changed to an
office area. Colonel Welsh voting yes, agreeing with previously stated comments. Mr. Holt voting
yes, because the nature of the area has changed considerably. Mr. Baldwin voting yes, for the
aforementioned statements. Dr. Jones voting yes, in view of previous discussion regarding the
Comprehensive Plan. Ms. Still voting yes, in concurrence with all of the previous statements. Mr.
Tolbert voting yes, for all of the previous statements made and he thinks it’s going to make better
use of that particular piece of property.
4. C-16-01 The Gathering Place Large Family Day Care at Solid Rock Baptist Church at 113
North West Street – Public Hearing and Review of a Conditional Use application to
establish a large family day care serving seven children within an existing building. The
property is 0.558 acres and is zoned RG-1 (General Residence Zone). The property is
located on the east side of North West Street just north of Fulton Street. The owner of record
is the Solid Rock Baptist Church. Property Address: 113 North West Street. Tax Parcel: ED-
05-076.08-03-02.00-000. Council District 4.
Representatives: Ms. Donna Bullock, The Gathering Place; Pastor William Grimes, Solid Rock
Baptist Church
Mrs. Harvey stated that the Conditional Use Site Plan is to permit a large family day care in the
community room of an existing building utilized as a church at 113 North West Street to be known
as The Gathering Place. The property is zoned RG-1 (General Residence Zone). The owner of
record is Solid Rock Baptist Church and the leasee is Donna Bullock.
Conditional Use Site Plan application C-13-07 for the construction of a two story community center
also on the property but addressed as 109 North West Street was approved by the Planning
Commission on August 19, 2013. It is adjacent to the existing place of worship. The parking lot and
the tree planting requirements were also included and approved in the Site Plan application. The
project proposal for seven (7) children and three (3) attendants will be classified as a large family
day care by the Zoning Ordinance. Day care facilities also require licensing through the State of
Delaware. The number of children permitted in a day care facility is determined by the State of
Delaware along with mandated child to attendant ratios. The applicant provided a copy of the
requirements from the State Office of Child Care Licensing with regards to the requirements of
Rule 265 for an outdoor play area located within a safe walking distance. The applicant indicated
7
Page 12
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
that the day care intends to utilize the play area located on the corner of West Division Street and
North Kirkwood Street. The applicant will need to provide approval for this site from Child Care
Licensing.
Based on the square footage of the new community building and the existing use as a place of
worship, the total number of parking spaces required for these uses are fifty (50) parking spaces.
With the previous application C-13-07, the Planning Commission considered and approved two (2)
waivers for an overall reduction in the number of off-street parking spaces and the utilization of the
combined parking spaces outlined in the Zoning Ordinance Article 6, Section 3.9 which allows the
Planning Commission to reduce the overall number of off-street parking spaces. The applicant’s
request for the reduction of overall number of parking spaces to twenty-six (26) was approved. Four
(4) parking spaces are required in the Zoning Ordinance for a large family day care which meets the
requirement for the parking on the site.
Based on the total site area of 24,298 square feet, nine (9) trees will be required. There are a total of
ten (10) trees located on the site which met the tree planting requirements for Conditional Use Site
Plan application C-13-07.
Ms. Bullock stated that she was in complete agreement with everything stated by Mrs. Harvey.
Mr. Tolbert questioned what the relationship was between her organization and the church?
Responding to Mr. Tolbert, Ms. Bullock stated that there is no affiliation; her organization is a
separate entity.
Dr. Jones stated that she thinks she read that there will be no worship services when the day care is
in operation. Responding to Dr. Jones, Ms. Bullock stated that was correct.
Dr. Jones questioned if that would be Monday through Friday? Responding to Dr. Jones, Ms.
Bullock stated yes.
Dr. Jones further questioned if this would create an issue for services held on Good Friday or on
other days during the week? Responding to Dr. Jones, Pastor William Grimes stated that there will
never be any services that will need to be held in the sanctuary when the day care is open. If they
needed to do anything it would be in the community outreach center next door to the church.
Mr. Tolbert stated that it’s described as a large family day care, what services will they provide?
Responding to Mr. Tolbert, Ms. Bullock stated that they would provide minimal fee day care for
children ages infant to two (2) years old.
Mr. Tolbert stated that large “family” day care threw him off; he didn’t realize that the services
would be for children. Responding to Mr. Tolbert, Mrs. Townshend stated that’s the Zoning
Ordinance classification.
Mr. Cregar stated the hours of operation listed were 7:30am to 5:30pm and may vary. How would
they vary? Responding to Mr. Cregar, Ms. Bullock stated that the only change in hours of operation
would be if a parent was late picking up a child.
8
Page 13
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Tolbert questioned if Ms. Bullock has had experience with running day cares? Responding to
Mr. Tolbert, Ms. Bullock stated yes, she was the director for Mom’s House on South State Street for
almost nine years.
Dr. Jones questioned if this was a contractual relationship with the church? Responding to Dr.
Jones, Pastor Grimes stated yes.
Mr. Holt questioned if the day care would be open to the general public or if they would have to be
a member of the church? Responding to Mr. Holt, Ms. Bullock stated that they would not have to be
a member of the church but they are trying to offer the service to low income mothers or families,
preferably single parents how are working and trying to better themselves. With the cost of day care
today, it’s very high. When she worked at Mom’s House, it was a free day care. She can’t do a free
day care but she can do a very cheap day care.
Mr. Holt questioned if the expense of the day care would be because they would have to provide
food to the children? Responding to Mr. Holt, Ms. Bullock stated that there are programs where
they can get food to feed the children. The overall cost at some point will be to pay rent and utilities
for the property and also to cover the cost of staff. The three (3) of them are not looking to get rich;
they are looking to offer a service.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Holden stated that for infants to two (2) year olds, he doesn’t know that there will be a lot of
playground use but he is curious on distance and ownership of the playground and if Planning Staff
views that as a potential conflict or is that addressed by other regulatory authority? Responding to
Mr. Holden, Mrs. Harvey stated that would be addressed by Child Care Licensing.
Mrs. Townshend stated that the property that they look to use is a City park just across the street.
Mr. Holden questioned if from a City standpoint that would be an issue? Responding to Mr. Holden,
Mrs. Townshend stated no.
Colonel Welsh moved to approve C-16-01 The Gathering Place Large Family Day Care at Solid
Rock Baptist Church at 113 North West Street, he thinks it’s a good thing for the community and
that it’s a very good thing that Ms. Bullock is doing. The motion was seconded by Mr. Holt and
unanimously carried 8-0 by roll call vote. Mr. Holden voting yes; he thinks that affordable child
care is a very important thing in our community and he appreciates the efforts. He thinks the area,
use and impacts to the community are reasonable. Mr. Cregar voting yes; he likes the idea that the
church and citizens are working together to provide this less expensive day care. He thinks it’s a
good use of the building and a good mixed use to allow for people with lower incomes to have child
care. Colonel Welsh voting yes, for all of the previously stated comments. Mr. Holt voting yes; he
feels like it’s a good asset for the community and also for the church. Mr. Baldwin voting yes, for
the reasons stated; it’s a much needed service and he applauds the applicant. Dr. Jones voting yes,
she commends Pastor Grimes and his congregation for the vision of outreach in a high need area.
She is familiar with Mom’s House and looks forward to the same level of quality of child care in an
area of high need. Ms. Still voting yes; she thinks it’s a very appropriate Conditional Use for the
9
Page 14
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
area and she thinks it’s a good opportunity for people to have low cost day care. Mr. Tolbert voting
yes, for all of the reasons previously stated. He is particularly impressed with what Ms. Bullock
stated about the cost of services at her facility. There is no question that day care today is a very
costly thing for a lot of parents and she is going to try to help as many people as they can with that
cost and he appreciates that.
5. C-16-02 Residential Treatment Facility on property of Healing Wings Christian Center –
Public Hearing and Review of a Conditional Use application to establish a residential
treatment facility as a philanthropic use within an existing building previously approved for
use as a homeless veterans shelter under Application C-11-01. The use is proposed for the
westernmost building (rear building) on the property which is constructed in a dormitory
format. The property is 3.32 acres and is zoned R-8 (One Family Residence Zone) and
subject to the COZ-1 (Corridor Overlay Zone). The property is located on the southwest side
of McKee Road, north of the Emerald Pointe subdivision. The owner if record is Healing
Wings Christian Center. Address: 1420 McKee Road. Tax Parcel: ED-05-067.00-01-20.00-
000. Council District 1. This application is associated with C-11-01 approved by the
Planning Commission on April 18, 2011 with Final Plan approval on October 28, 2011.
Representatives: Mr. Tolano Anderson, Owner of Because We Care; Mr. John Sigler, Esq. General
Counsel for Psychotherapeutic Services Inc; Mr. Sean Keblen, Psychotherapeutic Services Inc
Mr. Cook stated that this Conditional Use review is to establish a residential treatment facility as
philanthropic use within an existing building which was previously approved for use as a homeless
veterans shelter under application C-11-01. The project area consists of a portion of one parcel of
land located at 1420 McKee Road. The building where the activity will take place is in the rear of
the property where the existing dormitory facilities are located. The application as submitted
proposes no changes to the existing site or structures. The conditional use review is to review the
change of use from what was specifically approved in the previous application.
In the DAC Report of February 3, 2016, there were a few things commented upon by Planning Staff
as well as some of the other agencies. The existing structure includes fourteen (14) beds. Staff noted
in the report that the parking requirement has been met; there are fifty-four (54) spaces provided
and fifty-two (52) spaces required. Some of the other physical requirements of the site are in place
such as a loading area. Dumpsters are located on the site. There are sidewalks located along the
public road frontage but he doesn’t believe that there is connecting sidewalk on either adjacent
parcel. There are fences existing along property lines and at various places within the site. There is
also lighting provided throughout the parking lot on a series of poles.
The two (2) story building has fourteen (14) beds and fourteen (14) rooms. The residential rooms
are located on the second floor and the first floor has common areas, offices, a full kitchen and
utilities on-site. There is a requirement for tree planting and landscaping. They did not submit a
landscape plan with the application so the receipt of a landscape plan and verification of planting is
a condition of the Site Plan approval. The tree planting requirements will be verified at the time of a
Certificate of Occupancy inspection.
The property is zoned R-8 (One Family Residence Zone) which is one of the reasons why it’s
coming in for conditional review again. It’s also subject to the COZ-1 (Corridor Overlay Zone). The
10
Page 15
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
applicable portions of that Code relate to tree planting. Staff did provide some comments to the
applicant regarding some corrections that they will be working to make on the submitted plan
before Final Plan approval is granted by Staff. The total tree count required was forty-five (45)
trees; they estimate that a good portion of those are already on the site and they just have to verify
them on the plan.
In terms of recommendations suggested as conditions of approval, there were questions from the
Fire Marshal’s Office and the Planning Office regarding the exact nature of the activities and
services being provided on the site which they would like a detailed description of that in writing.
Also, for the Commission’s consideration in terms of their motion, recommended that the
Commission consider recommending an overnight resident occupancy maximum. This was done
with the previous use and that was for fourteen (14) rooms and fourteen (14) beds. Also in Article
10 Section 1.42, as they have done in the past with some Conditional Use applications, Staff
recommended that the Planning Commission approval be conditioned upon the requirement for a
review in one (1) year to confirm compliance with the conditions of approval and to see if further
review is required.
Mr. Anderson stated that he was here to speak on behalf of this application. They are here to resolve
a technicality. The Commission approved this project as a veteran’s home years ago and as a result
of that it limited the use of the facility to military veterans only. Having served in the U.S. Army for
twenty-four (24) years, he can appreciate that consideration; however, it’s not really practical. They
are here to resolve that issue simply in terms of allowing non-military veterans to also use the
facility. There are no planned changes, no changes to the site, and no changes to the building. They
simply want to make a change to the people that are being served to be more than U.S. military
veterans.
They have had a visit from the Fire Marshal, who has received the letter with the information that
Mr. Cook has referenced. They are also expecting sixteen (16) beds. The difference between
fourteen (14) and sixteen (16) would not be a change that he is aware of from a previous application
but they actually look forward to moving forward with this. They are excited and eliminating that
limitation or discriminator from military veterans, really helps them to move forward.
Mr. Tolbert questioned what Mr. Anderson considers non-military veteran? Responding to Mr.
Tolbert, Mr. Anderson stated any individual that needs help and support. It could be a veteran or
not. Veterans are absolutely appreciated and welcome but those who have not served in the military
would also be welcome as well.
Colonel Welsh stated that in 2011 this property was approved as a veteran’s shelter, now you are
seeking approval as a residential treatment facility. That kind of indicates perhaps a different
operation; is it basically a different operation not just a different name? Responding to Colonel
Welsh, Mr. Anderson stated that it basically is the same operation, it would allow for people that
haven’t served in the military to utilize the facility.
Colonel Welsh questioned if they would be using it as a shelter or as some type of drug or alcohol
treatment center? Responding to Colonel Welsh, Mr. Anderson stated that it would be residential
treatment center. Basically the same services provided to the veterans; they have very many of the
11
Page 16
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
same issues, problems and concerns as those on the civilian side. So it would simply open this
location up to those who are non-military.
Mr. Holt questioned if they charge a fee? Responding to Mr. Holt, Mr. Anderson stated that there is
no fee charged the individual attending.
Mr. Sigler stated that he is an attorney in the City of Dover and is also General Counsel for the
organization that is working with Mr. Anderson’s organization to provide these services. Yes, there
is a charge. This is an addictions treatment program for adult females who have already been
detoxified who are already in recovery and this is there next step. They will be in residence for no
more than ninety (90) days. Some will be private pay; they could be our neighbors, friends or family
members. Others may be Medicaid, Medicare or other government subsides.
Mr. Tolbert questioned if Mr. Sigler stated that the treatment center would be just for females?
Responding to Mr. Tolbert, Mr. Sigler stated this is a female addictions treatment program licensed
by the State of Delaware.
Mr. Tolbert stated that this facility was originally a program for veterans, now it would be for
anyone. Is there a shortage of veterans? Responding to Mr. Tolbert, Mr. Anderson stated no, they
expect the population of veterans to certainly be in attendance or clients at this facility. He doesn’t
want this issue to be lost. If we specifically say females at this point for this Commission then they
will once again be limited in the future to only being able to help females, just like they are limited
now to only being able to help veterans. He would like to not have that distinction although this
particular program is catering particularly to these women; he doesn’t want that to be a limitation so
that they can serve men and women in the future.
Mr. Tolbert questioned if Mr. Anderson planned on serving men in the future? Responding to Mr.
Tolbert, Mr. Anderson stated that he doesn’t want a limitation of not being able to serve males in
the future.
Mr. Tolbert questioned what the limit of beds was that can be at this location? Responding to Mr.
Tolbert, Mr. Anderson stated sixteen (16).
Mr. Tolbert stated that it shouldn’t be too difficult to fill the sixteen (16) beds. Responding to Mr.
Tolbert, Mr. Anderson stated no, not with the needs of our community.
Dr. Jones questioned if there was proper notification to the public? Is this one of those situations
where the public has to be notified? Responding to Dr. Jones, Mrs. Townshend stated yes, they did
meet the public notice requirements.
Dr. Jones stated that she thinks she has received a little bit more information because residential
treatment was just a little bit vague for her. She thinks they have some additional information but
she sees that one of the conditions of the application was to provide more clarity on the services
being provided. Responding to Dr. Jones, Mrs. Townshend stated, yes and to date the Planning
Office do not have that in hand.
12
Page 17
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Dr. Jones stated that she is a little bit uncomfortable with the vacillation. She knows that the
applicant stated that they don’t want to be pinned in but as a Commissioner she is a little
uncomfortable with it. Responding to Dr. Jones, Mr. Anderson stated that that’s exactly the point;
not wanting to be pinned in. This particular program that they are working with right now is for
females but that doesn’t mean that from this point forward that it would just be limited to females.
That’s the distinction that we wanted to make; not just veterans, not just women but human beings
in need of the services.
Mr. Sigler stated that the information that is apparently not in the packet was submitted by letter on
February 9, 2016 to the Fire Marshal. It is a full description of the service to be rendered as well as
the staffing. He provided a copy of the letter to the Commission.
Subsequent to that letter, he had the privilege of speaking with the Fire Marshal and he informed
him that he had looked at the submission and it met with all the requirements. The contract that they
will have to provide these services is a five (5) year contract and it is female only during that five
(5) years.
Mr. Tolbert questioned if they had a contract with the State? Responding to Mr. Tolbert, Mr. Sigler
stated that they have a contract with the State and with Mr. Anderson’s organization for five years.
Mr. Tolbert stated that the applicant says there will be sixteen (16) beds; do they plan to enlarge that
facility? Responding to Mr. Tolbert, Mr. Sigler stated that they have absolutely no plans to enlarge
and sixteen (16) is a maximum number not a minimum number. That number cannot go above
sixteen (16) at any given time.
Dr. Jones questioned who Mr. Sigler was representing? Responding to Dr. Jones, Mr. Sigler stated
that he is General Counsel for a licensed provider by the name of Psychotherapeutic Services Inc.
They have been providing these services in the State of Delaware since 1988. This is something that
they know how to do and he is also a retired police officer in this town and he can tell you that they
need this type of service for these people. This is something that is very important; addiction is a
problem that unfortunately they are re-visiting since his days in the 1970’s and it’s a very ugly
thing. Unfortunately, we as a State don’t look at a female addicted person the same way as a male
addicted person and it’s time that we did so and that’s what this program is.
Mr. Cregar stated that he needs clarification on exactly what is going on in that building today.
Responding to Mr. Cregar, Mr. Sigler stated that the building is empty and has been empty for
years.
Mr. Cregar questioned that it has not provided services to homeless veterans? Responding to Mr.
Cregar, Mr. Anderson stated no, the programs for Veteran’s Administration due to government
budgeting constraints has always been an issue because of continuing resolutions or other budget
issues and so forth with the Veteran’s Administration. They have has several meetings with them
and have come close several times but they are not able to complete the transaction because of
budget constraints on the Veteran’s Administration side. That also was one of the reasons for lifting
this restriction or limitation to veterans only because it did not make it a practical program in order
to use this facility with just military veterans only; it basically tied their hands.
13
Page 18
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Cregar stated to explain to him exactly what this building will be used for now with these
female addictions people. Responding to Mr. Cregar, Mr. Sigler stated that he is not the clinical
person but he has the person here who is the clinical person, Mr. Sean Keblen.
Mr. Keblen stated that there will be female specific treatment because issues that females come in
with are often different than male clientele which was stated earlier. The female population has
often been not looked at as having as severe of an issue or needing as severe of treatment. There
will be treatment that is gender specific for females like parenting, different adult living skills that
will help them be successful, it will be a trauma informed cognitive behavior therapy model which
is a national trend and empirically based as to be what is most effective in dealing with addictions at
this point in time. It will also be a person centered model which helps deal with an individual rather
than the group of people as a whole. They will go through individual counseling, they will have
group counseling, they’ll have family counseling, vocational services to help them locate jobs, they
will have educational opportunities like GED to help them with educational progress that they will
need, help finding them placement when they have completed the program and they are ready for
discharge to help them be successful in their sobriety and maintain their sobriety in linking them to
the appropriate community based resources.
Mr. Cregar questioned if this was a locked facility? Responding to Mr. Cregar, Mr. Keblen stated it
was locked from the outside. From the outside you can’t enter but you can exit.
Mr. Sigler stated that he thinks Mr. Cregar was asking if this is a secure facility. This is not a secure
facility; this is a voluntary treatment program. It will have security but it is not a secure facility.
Mr. Cregar questioned if any of these residents that could participate in this program have criminal
charges? Responding to Mr. Cregar, Mr. Keblen stated yes, they possibly could. They could be
referred through the court system as having a need for treatment.
Mr. Cregar questioned Staff if when this was advertised, when we say residential treatment does the
neighborhood really know what’s being proposed? Responding to Mr. Cregar, Mrs. Townshend
stated that she believes that the advertisement said residential treatment so it may not have had the
specific details. That’s part of the reason why Staff requested the details. She believes that it’s more
than just a technicality that it’s not a veteran’s home anymore because there was no reference in the
previous Conditional Use to providing substance abuse treatment services or any of those things.
From her perspective, this is a change in the Conditional Use that had been previously granted so
that’s why it is back to the Planning Commission.
Mr. Sigler stated that the answer that was just given to Mr. Cregar was partially correct and very
misleading. The people who will be referred to this program may or may not be there as a result of a
court commitment. It is possible that they could be but that is not one of the requirements. They
have the absolute ability and responsibility to reject anyone who does not fit the model. These
people have to be socially, physically and emotional capable of being in the community. They have
the ability and they will reject anybody with a history of violence, fire setting or any of that.
According to their contract with the State, they have the ability to keep these people out if they
don’t fit their model. The answer that was just received from Mr. Keblen was correct; they may
have had criminal justice impact record but it won’t be serious because they won’t accept them and
are not required to accept them.
14
Page 19
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Anderson stated that he wanted to clarify whether or not people are going to receive treatment
because of addictions. He doesn’t view that as something that wasn’t shared openly from the very
beginning. The term residential treatment facility in itself to some extent indicates that these are
people that are receiving treatment for this issue in terms of addictions. In terms of his dialogue
with Planning Staff he doesn’t remember any time were that wasn’t open and apparent. He thinks
that the fact of the matter is and he remembers discussing this with the Councilman for that district,
Mr. Hosfelt who came to the facility, who toured the facility and who walked through and talked
about specifically what they were going to be doing and how much the community needed it. He
appreciated the fact of the good paying jobs that are going to be brought into the community and
that this particular group of people in our community that really need help were actually going to
have an opportunity to be helped in a facility over 6,300 square feet that has been sitting there
waiting to be put into service to help the City and to help this community and to help those
individuals that is literally languishing there. His appreciation for that and his consideration for it
and the discussions with Planning Staff on the specifics of it, made it very apparent to him of what
it is that they are trying to do, what they think is of benefit and he just doesn’t want there to be any
misunderstanding of that particular aspect. They have no opposition from the neighborhood. This
particular building as it’s referenced in the packet is several hundred feet off of the road. It is almost
four hundred (400) feet off the road on a fenced property. This is a dormitory building that’s
designed almost perfectly for this purpose and it’s no secret what needs to be accomplished there
and what these people need.
Dr. Jones questioned if she understood that the duration of a stay is ninety (90) days? Responding to
Dr. Jones, Mr. Sigler stated yes, no more than ninety (90) days. It’s probable that most of these
people will have gotten to the point where they can move to the next step in their rehabilitation;
return to their families and jobs probably prior to the ninety (90) days but ninety (90) days is the
maximum in this program. Remember that the patients will have already been through detox, they
will already be stable and they will have been deemed by the Division to be ready for this kind of
program. After this program, they will go into other programs that are not residential.
Dr. Jones questioned what division he was referring to? Responding to Dr. Jones, Mr. Sigler stated
the Division of Mental Health and Substance Abuse.
Mr. Anderson stated that because the question of possible criminal background or having a record
was raised, he wants to make it clear that many of their military veterans do have those interactions
with the police departments. They do have records; they do have criminal backgrounds in many
cases as a result of their substance abuses. That’s why they would fully expect veterans to not only
use this facility as well as civilians but that should not necessarily be a discriminator. Part of the
problem that these people have brings them in to contact with law enforcement.
Mr. Holden stated that substance abuse treatment is needed; he doesn’t doubt that female substance
abuse treatment is a much needed service in our community. He has concern over the fact that here
in this area we are gaining a better understanding of what is sought by the Conditional Use, but his
real concern is that the general public doesn’t have benefit of this prior. In a procedural sense, what
are the Commissioner’s options? He is not comfortable supporting this moving forward without the
airing of what they have learned here to allow the public to understand. They are surrounded by
residential neighborhoods and an elementary school across the street and he thinks the public needs
15
Page 20
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
the benefit of the knowledge that they have gained here tonight to choose if they want to come to
support or to speak in opposition of them. What options do they have? He doesn’t want to shut the
door but he doesn’t feel comfortable supporting it tonight either. Responding to Mr. Holden, Mrs.
Townshend stated just to reiterate in response to Mr. Holden’s question and Mr. Cregar’s earlier
question, the public notice states Conditional Use review for a residential treatment facility. The
whole idea of substance abuse treatment was not a surprise to Staff, that’s been the discussion all
along. What they did not know and what this letter handed out tonight helps to clarify is what that
means. In terms of substance abuse treatment, there is kind of a continuum of care as Mr. Sigler
stated, detox into transitioning back into the residential setting. If the Planning Commission is not
comfortable that residential treatment facility is descriptive enough for the adjacent property owners
to truly know what is being proposed here, it could be deferred with a hearing set for next month
and then re-advertised.
Mr. Holden questioned if it would be deferred by motion of the Commission? Responding to Mr.
Holden, Mrs. Townshend stated yes.
Mr. Holden stated that the Site Plan shows that there is partial fencing there, not full fencing. They
don’t have benefit of the aerial to understand. He wants the applicant to hear that he doesn’t know
that this is not an appropriate use but he thinks the public needs to see the full record; the packet
that’s available to the public needs to be complete for the Commission to appropriately address
what they are being asked to do tonight. He would be more in favor of deferring it to allow that
process to happen and see where we get to. Responding to Mr. Holden, Mr. Anderson stated that the
primary issue being dealt with for the veterans occupying that facility is the same problem which is
substance abuse. The second thing was that the public notice requirements are very specific and
they are very detailed. They have met all of their obligations, the public notice was printed in the
newspapers, they posted the property within the time frame necessary, they sent letters to every
property owner within two hundred (200) feet and they’ve met with their obligation. They are not
here to do anything that is adverse to the community. The property is fenced, there is an entrance on
the roadway and the entire property is fenced. It’s several hundred feet to the back of the property.
It’s almost ideally suited for this particular purpose, as he mentioned Mr. Hosfelt’s comments
earlier. Having met their obligations, he is not asking the Commission to do something that they are
uncomfortable with but he is thinking in terms of what they have done. The applicant met with the
Development Advisory Committee and they answered all of their questions and they were very
specific. They were specifically asked questions by Staff and by all of the other agencies that were
there. They have met with the Fire Marshal and he has been on to the property as well. This is
essentially where they stand right now. There is a serious problem for them if the Commission
doesn’t consider the application; this program could very well be torpedoed altogether if they are
not granted a Conditional Use. He just wants to make sure it’s clear that they did meet all of the
public notice requirements and they did meet every obligation with the DAC, and they have done
everything that they were asked to do up to this point in time. To be in this position now is a little
precarious.
Colonel Welsh stated that he initially asked for the distinction between what was homeless
veteran’s shelter and now a residential treatment facility. Quite honestly, it seemed that you tapped
danced around it a little. You said that you just wanted to make it open to everybody not just
veterans. It wasn’t until after there was more questions asked, it came out that it was going to be a
treatment facility; a drug and alcohol abuse treatment facility or people with behavioral issues. That
16
Page 21
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
is needed in the community and he doesn’t think anyone can deny that. He thinks Mr. Holden was
very eloquent in his comments that we need to have that. His concern is the same as Mr. Holden’s;
did the public know that there are going to be people there receiving treatment for drug and alcohol
abuse or perhaps even a criminal record? Responding to Colonel Welsh, Mr. Anderson stated that
what they had in their proposal to the Veteran’s Administration was very specific. The primary
elements were the drug and alcohol abuse counseling, social adjustment counseling, transportation
for off-site counseling for various mental and/or drug related and medical appointments and there
was in-house counseling and off-site counseling. It’s essentially a mirror of what’s happening here
just with a different population. The original program was also residential, the veterans lived there
and they were also cared for there. They had treatment and appointments there but they were also
being transported off-site to other appointments for their abuse issues and being brought back to the
facility. That was the scope of the contract with the VA.
Colonel Welsh stated that was the contract with the VA and the VA certainly knows it but does the
surrounding public know that? In the notification letters that were sent to them, did they spell that
out, that there were going to be people there potentially with criminal backgrounds or with drug and
alcohol abuse issues that are going to be undergoing counseling? Responding to Colonel Welsh, Mr.
Anderson stated that they didn’t specify that there would be people there with criminal backgrounds
because they actually don’t know if there will be anyone there with a criminal background. That’s a
probability and a possibility but to specify that that’s what’s going to be the makeup of clientele he
thinks would be inappropriate.
Colonel Welsh stated that the possibility exists. Responding to Colonel Welsh, Mr. Anderson stated
that the possibility existed with the veterans as well. When the Commission approved the
application last time that was apparent, these were veterans and we know what the issues are with
our military veterans. If you look at any of the homeless or veterans shelters now, you can see that
there is a certain effort to support them in their abuse issues.
Colonel Welsh stated again they have gone from a veteran’s shelter, with thirty-five (35) years in
the military he understands that there is a desperate need for it. He is sure there is need for
counseling and drug and alcohol abuse treatment but again, he goes back to the same concern that
Mr. Holden had and that’s the reason that he asked this question. Did the notification that went to
the neighbors spell that out? Responding to Colonel Welsh, Mr. Sigler stated that as an attorney in
this area he can tell you that 42 CFR Part 2 tells them that they cannot tell the public that these
people in fact are receiving treatment for addictions because that violates federal law. That
identifies them and by identifying them if they had put that in the notice, they would be subject to
federal penalties.
Mr. Holden stated that in his view, there’s some kind of nebulous shifts here. The original
Conditional Use for a veteran’s home and code purple shelter, he wasn’t here for that application so
he doesn’t know if that was described as a veteran’s treatment facility that could include substance
abuse or if that’s inherently understood. He did not understand it that way and so that’s a bit of a
change. Anytime you see a multitude of changes in these discussions it raises some concern. The
fact that the information that was provided to the Commission tonight that was not in the public
packet and available to the public is his greater concern. He is comfortable with denying the
application or deferring the application because of those reasons. He understands that that’s a
challenge in the business sense that there are issues there that they have been struggling with the
17
Page 22
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
VA and he also thinks that the citizen’s rights and the Conditional Use hurdles are onerous for good
reason. Responding to Mr. Holden, Mr. Sigler stated that they are in a position and he has shared
this with Staff as well, that if they don’t have this program open and up and running in that facility
or another facility and there is no other facility in Dover or Kent County to hold this, then this will
not happen in Kent County this year and it may not happen in Kent County at all. He doesn’t make
that as a threat; this is the pressure that they have been working under. Mrs. Townshend and Mr.
Cook know that this is one of the reasons why they are here tonight because they are trying to get
this thing done and they are trying to get this done in such a fashion that these people can get the
treatment that they are entitled to, that they deserve and that they need. The fact of the matter is that
the State of Delaware is going to cancel their contract if they do not open by April 1, 2016. That’s
not a threat, it’s a fact. It’s not just a business fact, it’s a fact that they will pull this contract and
give it to someone else somewhere else.
Mrs. Townshend stated that one point that she did make with the applicant during the pre-
application meeting was the reason for the Conditional Use process. It’s because this is a residential
zone so that’s the purpose of the scrutiny, not to say that uses aren’t desirable in Dover or desirable
at this location but it’s to allow for the input and allow for the Planning Commission to place the
appropriate conditions based on the factual information and the knowledge of the ordinance to
protect this use as it relates to the zone. She doesn’t want to take away from the need but she wants
to correct the one thing that was stated previously, that this was a technicality. She never saw it as a
technicality; she sees it as a Conditional Use in a residential zone regardless of the fact that it’s
setup like a dormitory building. There is the possibility when they do the Comprehensive Plan
updates to look at the zoning and see if there is a more appropriate zoning classification but right
now this is what they are left with. From the applicant’s perspective, if you believe that the Planning
Commissioners are asking a lot of hard questions it’s because they are here to maintain a standard
and again the R-8 (One Family Residence Zone) is a very common residential zone. If we are
saying this is appropriate here then we are saying it’s good in many of our neighborhoods. Again,
the issue is about consistency, fairness and transparency. She thinks those are the issues that
Commissioners have raised. That’s part of the reason that they did want more information on the
record about the types of services being provided so that they had the information for them to have
in your deliberation. Responding to Mrs. Townshend, Mr. Sigler stated that if you go look at this
property you will see that it’s isolated. There is nowhere else in the City that he is aware of, where it
would be appropriate for this type of facility. If you don’t have this kind of facility there then that
building is absolutely useless; it has no other use except as a residential facility of some sort. That’s
why it was built to begin with he would assume. To be very frank, behind it is woods. This is about
as isolated as it can get and although it’s not a secure facility, it might as well be because you can’t
get to it from anywhere. This is about as good as it gets in the City of Dover for this kind of facility.
He thinks everyone would be a lot more comfortable if they went to this property to see it. You
would see that this is absolutely ideal and there is no one around it to be impacted.
Colonel Welsh questioned how many notices went out? Responding to Colonel Welsh, Mr.
Anderson stated that there were six (6) notices sent out.
Colonel Welsh stated that there are six (6) neighbors that are within two-hundred (200) feet that
could be impacted. Responding to Colonel Welsh, Mr. Anderson stated that they made it a point
through their individuals who are associated with the church to get a sense of whether or not the
neighbors would have any issues and the reason that you don’t see them here tonight is for that
18
Page 23
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
specific reason. There is a fourteen (14) acre parcel that completely surrounds this parcel except for
the street. To the rear, because of the wetlands located behind it and on both sides the land can
never be utilized of developed. That individual as they understand it has no issues with their use.
The adjacent property to it is another church and between the two (2) properties is over twenty-five
(25) acres of property. Yes, this is a residential zone but the reason that the notice was only sent to
six (6) people is because there aren’t very many homes there. This is so isolated and so remote in
terms of unless you drive several hundred feet down the drive, you can’t even tell that the building
is there necessarily. He knows the Planning Staff relatively well; they have been through a lot of
projects with the City. He has worked with Downtown Dover Development Corporation. They have
done their part; they have invested and tried to help the community and they are in process of doing
it right now on several fronts. They have been designated as a brownfield developer. They are
looking at blighted areas. They have done several projects in the Downtown area and other parts of
the City. They are not here to make a problem for the City or for their neighbors. It’s all about
working together and improving the community and improving our environment. They would never
do something that would be negative or adversely impact on them or their property values or their
ability to enjoy their properties. For this particular project, they have gone through great lengths to
make sure that it would have an adverse impact. He just wanted to let the Commission know that he
appreciates all of their questions and concerns. They have the same concerns as well. He
understands that they have got to make a decision but the fact of the matter is, they are in this
together to make this a better community and to make Dover a better place. This is not just
business, this is actually making a difference because we care.
Mr. Tolbert asked if the residents would only be able to stay there for ninety (90) days? Responding
to Mr. Tolbert, Mr. Anderson stated yes, ninety (90) days and he doesn’t know if that can be
reinstated but there’s a ninety (90) day time frame. This is the best part of the program, before they
get into the part of the program that actually re-introduces them to help them with placement, with
jobs and with things that are going to help them become productive members of the community
again.
Mr. Tolbert questioned what about the females that have children? How will that be handled?
Responding to Mr. Tolbert, Mr. Anderson stated that there are other programs that deal with women
with children but as of right now these are single women without children at this particular facility.
Mr. Sigler stated that is not correct. There is the possibility that there will be women with children.
That’s one of the reasons why this property was chosen, one of the reasons why the State has
decided to license this facility. Up to four (4) women can have children there but at no time will
there be more than four (4) children on the property. The minimum age for the children is three (3)
years old.
Colonel Welsh questioned if that was a State requirement? Responding to Colonel Welsh, Mr.
Sigler stated yes, that is a State requirement in the contract and it’s no more than four (4) children at
any given time and no more than four (4) women with children. The children will be housed with
the mothers and the mothers will be taking care of the children. In response to the question before of
is this a secure facility, it’s a staff secure facility. A minimum of two (2) trained individuals will be
there 24/7 plus the treatment staff during the day makes it even more than that.
19
Page 24
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Cregar questioned how long this contract has been negotiated? Responding to Mr. Cregar, Mr.
Sigler stated that they bid this contract last year.
Mr. Cregar further questioned if that contract was made available to City staff, which spelled out all
of the parameters of this program? Responding to Mr. Cregar, Mr. Sigler stated that City staff did
not ask for it, they asked for a synopsis and that’s what we gave them. It can be provided if it needs
to be.
Mrs. Townshend stated just going back to the public notice, as Mr. Anderson stated there were six
(6) addresses on the mailing list. Three (3) of those properties are churches and three (3) of them are
residences so it is half church and half residences.
Dr. Jones stated the churches are there but are the residences occupied? She believes that one
residence is not occupied. Responding to Dr. Jones, Mrs. Townshend stated that she believes that
Dr. Jones is correct just given her knowledge of the area. It looks like at least one may be but she
can’t tell for sure.
Mr. Tolbert stated that because of the ninety (90) day restriction and the limitation of females and
the restrictions on children, do they anticipate having to turn many women away because of that
requirement? Responding to Mr. Tolbert, Mr. Sigler stated that the State makes the referrals to them
and then they review those referrals to see which ones are appropriate and which ones are not
appropriate.
Mr. Tolbert questioned if the women couldn’t come straight to the facility to apply for the program?
Responding to Mr. Tolbert, Mr. Sigler stated they cannot, even private pay insurance has to go
through the process.
Colonel Welsh stated that it was a coordinated process through the State. Responding to Colonel
Welsh, Mr. Sigler stated yes, it’s a coordinated process through the State and overseen by the State.
He can guarantee based on his experience with the Division, they are going to be in there more than
he is, looking at them and they should be. They welcome them and will be prepared for them.
Colonel Welsh stated that it’s a much needed service and he thinks he would feel that perhaps he
hasn’t been responsible if they turned the applicant away. He was concerned about whether it was a
drug and alcohol treatment facility versus a veteran’s home. But it is a Conditional Use; it’s
something that the Commission can allow to happen, they can get their licensing, they can establish
their contract with the State of Delaware and during the course of that year if they have issues and
problems with the neighbors they can deal with it. Would the Commission have to wait one year
before dealing with it? Responding to Colonel Welsh, Mrs. Townshend stated if the Commission
sets conditions and they do not comply with the conditions then Staff can bring it back to the
Planning Commission.
Colonel Welsh stated that is kind of his thought process. He doesn’t want to deny people who need
the service. He is not an attorney but he kind of disagrees with the HIPPA law. Responding to
Colonel Welsh, Mr. Sigler stated that it is not HIPPA; this is the federal statute and the federal
regulations dealing with specifically with drug and alcohol. If you identify to the public what the
20
Page 25
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
facility is doing or identifying the people there as addicts then therefore you are in violation of 42
CFR Part 2.
Colonel Welsh questioned if you would be in violation if you say “they may be undergoing
treatment for drug and alcohol abuse?” Responding to Colonel Welsh, Mr. Sigler stated that is
correct because you have identified them.
Colonel Welsh stated that he finds that kind of hard to believe because he thinks a neighbor has a
right to know what’s going on there. How do you serve notice to that neighbor without violating
this Code that he is addressing? Responding to Colonel Welsh, Mr. Sigler stated that until he started
this particular path down his practice of law he would have agreed with Colonel Welsh 100%.
Having said that, he has appeared in court at every county of the State at every trial level on 42 CFR
Part 2 to protect the identity of and/or the fact they that were in treatment and the records of drug
and alcohol clients.
Colonel Welsh questioned even if you are not addressing specific individuals, just anybody that
comes and goes from there may be coming and going for drug and alcohol treatment? Responding
to Colonel Welsh, Mr. Sigler stated if they identify it as substance abuse treatment center which is
what it is then they have identified the occupants as people in need of substance abuse treatment and
we are in violation of 42 CFR Part 2.
Mr. Anderson stated that he is not an attorney; he is a practical person. He loves people, he is a
Christian that’s where his heart is and he appreciates Colonel Welsh’s consideration. This has been
a long year going through this process and it’s been very difficult. If the Commission would in fact
consider something to that effect they will meet whatever obligations are necessary in order to
provide this service to the community with whatever restrictions necessary. He thinks everyone will
see the benefit of it in the future and then whatever restrictions, limitations or conditions are set they
will be able to certainly see that is met. This is not your typical neighborhood. Within the twenty-
five (25) or twenty-eight (28) acre area there’s the three (3) churches and a couple houses. This is
not something that you are going into a neighborhood and splashing down this center.
Mr. Holt questioned how often can the City go out and inspect a facility like this? Can we go every
so many week or so many months? Responding to Mr. Holt, Mrs. Townshend stated that she
doesn’t know exactly what they would be inspecting it for. In terms of the care that they deliver, she
knows that City Staff is not qualified to inspect it for the quality of care. The only things that she
can think of that Staff would do routine inspections for are fire or building code issues. That’s
typically a once a year inspection.
Colonel Welsh stated that he was referring to the Conditional Use. The State is going to do the
inspection to make everything in the program is okay. His concern with the Conditional Use is if
they have neighbors who are complaining about activities that are going on there that otherwise
shouldn’t be going on there then they have the opportunity to review and revoke the Conditional
Use and they shutter their doors. Responding to Colonel Welsh, Mr. Sigler stated that one of the
things that they do when they have a program such as this is they try to put together a group of
neighbors although neighbors are a little scarce in this area. The neighbors know that they are
providing treatment; they don’t tell them what kind of treatment because they can’t. They may
guess, we may say too much and they may conclude but we don’t tell them. What we do tell them is
21
Page 26
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
that we want to be good neighbors and if they have problems this is who to call. Mr. Mark Hester is
his risk manager and he is also for a lack of better terms he is a complaint internal affairs
investigator. Every single complaint that they get becomes something that he has to investigate and
that they have to report. It’s reported to the State and also internally. Part of what they do is try to be
good neighbors. They understand that the general public doesn’t understand what they are doing
and has fears. All of us have trepidations about things that we don’t understand. They will have an
advisory group that will be there. It’s part of what they are required to do under contract but it also
makes business sense; that you go in and introduce yourself and give them a point of contact. One
of the reasons why they took Councilman Hosfelt out to see the property is so that he could see
what was going on with the property and what they were doing. He thinks that he can represent to
the Commission that Councilman Hosfelt was comfortable with what they were doing.
Mr. Anderson stated that all of the Commissioners are welcome to come to the site any time; it will
be a Class A operation and it will be effective. They won’t just be doing something they will be
making a difference.
Mr. Baldwin stated that he appreciates the fact that this is a much needed service. At the end of this
five (5) year contract, what are our options? Responding to Mr. Baldwin, Mrs. Townshend stated
that she would say that it relates specifically to the conditions that the Commission places on the
approval. If the Commission approves the Conditional Use permit subject to the statements made in
the letter sent by Psychotherapeutic Services Inc dated February 9, 2016, that has very specific
criteria and it does specify women as the clients that they are serving and specifying the number of
beds in the motion. That way at the end of the five (5) years, if the nature of the services changes
beyond what ever conditions the Commission set it would come back. So if the Commission set a
condition that it be for substance abuse services for women then in order to expand the services to
men, it would need to come back. If you don’t specify that in the motion as a condition then it
would not need to come back. That’s really at the purview of the Commission to determine what
specific conditions they want to put to make sure that they are comfortable with the approval.
Mr. Tolbert stated that they can’t state in the literature to the public that you are serving people who
are suffering from drug abuse. Aren’t there other terms that can be used without stating that they are
addicted to drugs like social problems, societal problems or some other terminology without saying
drug addictions but it would compass drug addiction? Responding to Mr. Tolbert, Mr. Sigler stated
that places them in a rather precarious position in that these people are not psychiatric so they can’t
say that they are. Which takes us out of 42 CFR Part 2 and puts us into HIPPA and there is no
violation there. These people are not psychotic, they are addicted. Saying that it is a residential
treatment center facility is about as far as they can go and still be honest with the people that they
are trying to tell. They are between a rock and a hard place. If he thought it would solve it, they
would do it but he knows he can’t allow his people to do it. He is not Mr. Anderson’s attorney but
he is not going to allow his people to do it.
Mr. Cregar stated that Mr. Sigler is now on the public record as saying that this is a drug and
alcohol treatment facility. Responding to Mr. Cregar, Mr. Sigler stated that is correct.
Mr. Cregar questioned if they have just violated 42 CFR Part 2? Responding to Mr. Cregar, Mr.
Sigler stated maybe; they will find out if somebody sues.
22
Page 27
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Cregar stated that this is a little nebulosus. Responding to Mr. Cregar, Mr. Sigler stated that this
is the real world that Colonel Welsh referred to earlier; they are between a rock and a hard place.
Mr. Cregar stated that it has just been identified in a public forum as a drug and alcohol
rehabilitation facility. It is out there and the paper wanted to write an article about it tomorrow they
could. Responding to Mr. Cregar, Mr. Sigler stated that is correct but they would hope that the
paper would not because they would be getting a violation from him stating that they are in
violation of CFR 42 Part 2.
Mr. Cregar questioned how the paper could be in violation if it was addressed in a public forum?
Responding to Mr. Cregar, Mr. Sigler stated that it doesn’t matter how you get the information, if
you disseminate the information you are in violation of 42 CFR Part 2.
Mr. Cregar stated that they have a land use decision that they have to make. Responding to Mr.
Cregar, Mr. Sigler stated that he understands and he is trying desperately to be helpful.
Mr. Cregar stated that need is not necessarily the issue that they have to address. They have to
address whether this facility in this area is in harmony with the character or what is there and
whether those churches and those other residents understand what is getting ready to take place.
That is the decision that he feels he has to make.
Mr. Sigler thanked the Commissioners and apologized for muddying the waters.
Mr. Tolbert opened the hearing to the public and after seeing no one wishing to speak, closed the
public hearing.
Mr. Baldwin questioned if they needed to specify that it is a treatment facility for females?
Responding to Mr. Baldwin, Colonel Welsh stated that he didn’t but they probably should specify
that.
Mrs. Townshend stated that Colonel Welsh made it subject to the correspondence of February 9,
2016 to Tim Mullaney Jr which specifies women. It also specifies that the number of beds can be up
to sixteen (16) but it does not specify a one year review.
Mrs. Townshend questioned if the DAC comments were also going to be accepted as conditions?
Responding to Mrs. Townshend, Colonel Welsh stated yes, he assume that the applicant is
accepting all of the DAC comments.
Colonel Welsh moved to approve C-16-02 Residential Treatment Facility on property of Healing
Wings Christian Center at 1420 McKee Road for a Conditional Use application to establish a
residential treatment facility emphasizing that it is conditional and that they comply with all of the
conditions that were set forth in the letter from Psychotherapeutic Services Inc to Timothy P.
Mullaney Jr. and now the Planning Commission is in receipt of and to include a review by the
Planning Commission of the Conditional Use in one year and the DAC comments, seconded by Mr.
Holt. The motion was carried 5-3 by roll call vote. Mr. Holden voting no, he is uncomfortable with
a number of factors. He thinks it’s a bit disingenuous to introduce a signed letter into the public
record and state at the same time that the information can’t be shared with public. He is
23
Page 28
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
uncomfortable that it’s been stated that it’s been used as a treatment facility when it’s Conditional
Use doesn’t support it and he is uncomfortable with what the public has had available to them so
that they knew whether to come in opposition or support of this application. Mr. Cregar voting no,
with all the reasons stated by Mr. Holden. Colonel Welsh voting yes, for the reasons that he stated
earlier. The community is in desperate need of a facility like this and the only question that the
Commission seems to have is perhaps one of public notification. We can’t answer one way or the
other if they do or do not know but he thinks fact that it is a Conditional Use allows the Commission
to at any time, terminate that Conditional Use. Mr. Holt voting yes, since it is a Conditional Use
and he feels that it is much needed in the community. Mr. Baldwin voting yes, it is a much needed
service and also because it’s a Conditional Use where the Commission can address any problems
that may come up in the future. Dr. Jones voting no, for several reasons. She has been on a
rollercoaster experience with the presentation. She was just not totally clear that all of the
presenters were on the same page in terms of what this project is about. She is a little bit concerned
about the inconsistent comments about the population being served. She is very uncomfortable with
it. Ms. Still voting yes, in reviewing everything stated in the February 9, 2016 letter she feels that
it’s a needed project and the fact that the Conditional Use can be terminated at any time in
conjunction with a one year review. Mr. Tolbert voting yes, because of the need for the services.
This Commission serves the right to oversee this application again so that gives them some control
over what happens and he is comfortable to a great extent with that.
The Commissioners recessed at 9:10PM for five (5) minutes.
The Commissioners returned at 9:15PM.
6. S-16-01 Lighthouse Construction Inc. Enterprise Office Building at 285 Beiser Boulevard –
Public Hearing and Review of a Site Plan application to permit the construction of a two
story 43,700 S.F. office building and associated site improvements. The project includes a
Minor Lot Line Adjustment Plan to increase Lot 2 from 1.578 acres to 3.294 acres with the
adjoining Lot 1 to be 21.744 acres. The submission includes the Performance Standards
Review Application. The property is zoned IPM (Industrial Park Manufacturing Zone) and
is part of the Enterprise Business Park. The property is located on the north side of Beiser
Boulevard east of Enterprise Place. The owners of record are Eric and Maria Tamesis and
the Del-Homes Catalog Group LLC; an equitable owner is Lighthouse Construction Inc.
Address: 285 Beiser Boulevard. Tax Parcels: ED-05-076.15-01-03.01-000 and a portion of
ED-05-076.15-01-03.00-000. Council District 1. Waiver Requested: Increase Impervious
Surface Coverage of Lot 1.
Representatives: Mr. Gregory Moore, Becker Morgan Group; Mr. Bob MacLeish, Lighthouse
Construction, Inc.
Mr. Holden recused himself from this application due to his employer being the engineer/architect
of record.
Mr. Diaz stated that this Site Plan is for a two story 43,700 square foot medical office building at
285 Beiser Boulevard in the Enterprise Business Park. The lot is in the IPM (Industrial Park
Manufacturing Zone). This application also includes a Minor Lot Line Adjustment Plan to increase
the size of the lot to 1.5 acres to 3.2 acres with the additional land coming from the neighboring lot
24
Page 29
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
at 1 Commerce Way to the north. The Lot Line Adjustment expands the lot so that it takes up the
full block that is bound by Beiser Boulevard, Enterprise Place and Commerce Way to the north.
Previously, it was about half the size of this block. The expansion also brings into the lot an existing
parking lot and a stormwater management pond that previously belonged to 1 Commerce Way.
Use of his existing parking lot ensures that the medical office building exactly meets its parking
requirements. They have a need for one hundred forty-six (146) parking spaces and have that
number provided in both the existing lot and the amount they are proposing to add.
One small issue that they had was that the Minor Lot Line Adjustment Plan slightly increased the
percent impervious surface coverage on 1 Commerce Way. The applicant has requested a waiver for
this increase in impervious surface coverage. Staff is recommending approval of the waiver because
while the percentage is increasing because of the Lot Line Adjustment, there isn’t any actual
construction of impervious surface on 1 Commerce Way.
The applicants are planning a varied façade on all four (4) sides of the building so there is visual
interest from all of the right-of-ways. All four facades are within the packet. Because the
development is in the IPM (Industrial Park Manufacturing Zone) it required a Performance
Standards Review Application. Staff is recommending that the Commission affirm that the site’s
proposed use meets the City’s performance standards because as an office building it will not
generate the hazards or the other objectionable elements that are expected of industrial uses. You
can also find that application in the packet.
The more detailed comments can be found in the DAC Report. There are comments from Public
Works, the Fire Marshal’s Office, DelDOT and Kent Conservation District. The two main things
that Staff would like the Commission to act on are the waiver request for additional lot coverage on
1 Commerce Way as part of the Lot Line Adjustment Plan and to review the Performance Standards
Review Application which is asking for affirmation that the office building will meet the City’s
performance standards.
Mr. Moore stated they are fine with everything that was stated by Mr. Diaz.
Mr. Welsh stated that this was a very attractive design.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Moore stated that they are fine with the DAC comments as presented with exception of
DelDOT. DelDOT actually indicated that they may consider a Traffic Impact Study for this
property and they don’t believe that a Traffic Impact Study will be beneficial because of the
construction of the new West Dover Connector. Mr. MacLeish and he had actually worked on a
larger project on the other side of Dover, directly adjacent to the same West Dover Connector and
DelDOT did not require a Traffic Impact Study for that project. They had done a study of the entire
region that covered the property and he believes that this property falls in the same category. The
improvements that will be made by that roadway will greatly benefit the intersections that affect this
property and they believe that a study being done before that road is finished, which is about twelve
(12) months out, would be a complete waste of money.
25
Page 30
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Tolbert questioned if the applicant had spoken to DelDOT about their concerns? Responding to
Mr. Tolbert, Mr. Moore stated that DelDOT did not appear at the DAC meeting so they were unable
to speak about this there. They would ask that Mrs. Townshend join them in making their voice
known to DelDOT in terms of their belief in lack of use of a study.
Mrs. Townshend stated that she and Mr. Jason Lyon have discussed it and he has had some follow
up with DelDOT. The other issue is that they property is located on a City street. They want to work
with DelDOT but they understand the applicant’s position so they will work through it.
Colonel Welsh stated that under Recommendations, Suggestions and Conditions of Approval to
meet the Code, Staff recommended that the outside HVAC equipment be designed to minimize
impact. Where is the HVAC equipment going to be placed? Responding to Colonel Welsh, Mr.
MacLeish stated that it will all be mounted on the roof.
Colonel Welsh stated that’s what he was hoping to hear and asked if it would not be visible.
Responding to Colonel Welsh, Mr. MacLeish stated that you try hiding these units the best as you
can. When you get to some of the ERV units and depending on what exactly that final system looks
like, they are centered in the building. The building is pretty wide but you may see a portion of it
but they do their best to hide it.
Colonel Welsh further questioned that it wouldn’t take over the architecture of the building?
Responding to Colonel Welsh, Mr. MacLeish stated no.
Mr. Cregar questioned if there were any green technologies being incorporated into the construction
of this project? Responding to Mr. Cregar, Mr. MacLeish stated yes, there are a number of green
technologies that they are working into it. This building will be very similar to the building that they
just created on New Burton Road.
Mr. Moore stated that in addition they use a parking lot that’s already there for another building that
actually is no longer there. It was a 70,000 square foot building that failed in a snow storm and
never got rebuilt. They are also reusing the stormwater facilities that were implemented for that
building and that property.
Ms. Still moved to approve S-16-01 Lighthouse Construction Inc. Enterprise Office Building at 285
Beiser Boulevard and to affirm that the proposed use as a medical office conforms to the
Performance Standards of the Zoning Ordinance and is not expected to generate excessive or
dangerous objectionable emissions and also to include the waiver for impervious surface coverage.
Colonel Welsh questioned if that waiver was required? He noticed in the comments that it states
that it’s going to be below the amount granted to Lot 1. Responding to Colonel Welsh, Mrs.
Melson-Williams stated that it’s actually an increase to what was previously approved. It’s over the
Code and it’s over the previous waiver that was granted.
Ms. Still moved to approve S-16-01 Lighthouse Construction Inc. Enterprise Office Building at 285
Beiser Boulevard and to affirm that the proposed use as a medical office conforms to the
Performance Standards of the Zoning Ordinance and is not expected to generate excessive or
dangerous objectionable emissions and also to include the waiver for impervious surface coverage,
26
Page 31
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
seconded by Mr. Cregar and the motion carried 7-0 by roll call vote with Mr. Holden recused and
Mr. Ambruso absent.
Mr. Cregar questioned if the applicant was okay working with Mrs. Townshend to work out
anything with DelDOT? Responding to Mr. Cregar, Mr. Moore stated yes.
Mr. Cregar further questioned if Mrs. Townshend feels comfortable in being able to help facilitate
that? Responding to Mr. Cregar, Mrs. Townshend stated yes.
Mr. Cregar voting yes, in accordance with the DAC comments and the review process that this Site
Plan is undergoing. Colonel Welsh voting yes, for reasons previously stated. Mr. Holt voting yes,
for all of the previous reasons stated. Mr. Baldwin voting yes, for the reasons previously stated. Dr.
Jones voting yes, for the aforementioned comments. Ms. Still voting yes, in accordance with her
comments in the motion. Mr. Tolbert voting yes; he is very well satisfied that the applicant will work
cooperatively with Staff.
7. S-16-02 Capital Commons at 505 & 515 North DuPont Highway – Public Hearing and
Review of a Site Plan application to permit the retrofitting of an existing vacant commercial
building (previous Kmart location) into two tenant spaces of 55,020 S.F. and 29,456 S.F.
and to permit the future use of two future restaurant/retail pad sites with buildings of 6,400
S.F. and 6,083 S.F. The overall building area totals 96,000 S.F. ± for the location to be
known as Capital Commons. Consisting of two parcels, the total property area is 9.079
acres. It is zoned C-4 (Highway Commercial Zone) with a portion of the property is located
on the northeast side of North DuPont Highway north of Townsend Boulevard. The owner
of record is Dover, DE Retail LLC. Addresses: 505 & 515 North DuPont Highway. Tax
Parcels: ED-05-068.09-01-35.00-000 & ED05-068.09-01-34.00-000. Council District 3.
Waivers Requested: Reduction in Arterial Street Buffer, Partial Elimination of Curbing,
Opaque Barrier Alternative Format
Representatives: Mr. Steve Hutchison, The DDR Corp; Mr. David Kuklish, Bohler Engineering
Mrs. Melson-Williams stated that this was a Site Plan application for the re-development for the
former Kmart site at 515 North DuPont Highway. The project actually involves two (2) parcels of
land which includes the corner property at 505 North DuPont Highway which was previously a
bank location. The property is zoned C-4 (Highway Commercial Zone) and there is a portion of it,
the northern part of the property, that is subject to the SWPOZ (Source Water Protection Overlay
Zone). The project today is primarily focusing on what is the re-development of the existing vacant
commercial building that exists on the site along with some associated site improvements for that
project. Because of the level of the site improvements and its adjacency to portions of the Towne
Pointe residential neighborhood, it is before the Planning Commission. The site improvements
include improvements to the parking lot itself, most specifically and probably most noticeably the
re-alignment and re-configuration of the entrance off of Townsend Boulevard which currently is an
angle. With this project, it will re-align that drive aisle entrance to the T typed intersection and
make some adjustments to the adjacent property in the parking lot areas.
First, she wants to focus on the SWPOZ (Source Water Protection Overlay Zone). With re-
development, there is a need to reduce impervious cover that exists within the SWPOZ (Source
27
Page 32
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Water Protection Overlay Zone). The Code establishes some thresholds for that. Currently, the
project is still working to achieve compliance with that aspect of the reduction of impervious
surface coverage in that area. There are a number of options that can be utilized to address that and
Staff’s fairly comfortable that as moving through the finalization of a Site Plan that they can get to
compliance with that through a number of ways. This project while focusing on the re-development
of the existing commercial building, could have utilized what they call the Site Development Master
Plan process to actually tell them all of the details about the two (2) pad site locations which are at
this point really serving as placeholders. The current bank building is proposed for demolition and
then a future building will be built at that location and then a second pad site location in the
northern corner of the site along Route 13. The applicant gave Staff some preliminary numbers for
sizing of those buildings and Staff has utilized some of that to test the parking that’s being proposed
on the site. But ultimately because they are not using that Site Development Master Plan process,
each of those pad site buildings will have to come back through a Site Development Plan review
with the Planning Commission and subject to a hearing when they actually have a tenant and a
formal design for each of those buildings.
Specifically, for this project because they are utilizing the existing building, there is no architecture
that’s required to be presented. The plan indicates at this point that they are seeking to divide that
large commercial building into multiple tenant spaces. At this point, it’s looking like two (2) tenant
spaces. Specifically with the parking, they do see somewhat of a reduction than what is currently on
the site available for parking with this project and the redesign. They go from an angled parking
scenario to the more standard format for parking. With this project, based just on the floor area
calculations for the buildings on the site, the minimum number of parking spaces required for the
project is three hundred twenty-four (324) parking spaces giving the maximum allowable by Code
to be four hundred five (405) parking spaces. The plan is currently showing three hundred eighty-
two (382) parking spaces so they are within the realm of parking. Should the pad site buildings
develop differently, different sizing, different uses with different parking calculations then the
parking in the future may need to be re-evaluated at that time.
The property is providing a series of loading areas to the rear of the main commercial building and
has indicated that bicycle parking will also be made available with the strategy of placing racks at
each of the building locations with more details to follow. With this project, they are seeing a
significant change in the sidewalk network that serves this property. For the sidewalk along
Townsend Boulevard, there is some improvement in that area. Specifically, along the Route 13
frontage this project will be constructing a ten (10) foot wide shared use path across that frontage
that is currently not there today. They are also starting to show the beginnings of connections from
these street frontage sidewalks into the site. There’s some clarity that needs to happen with that but
they are certainly making some progress in that realm as well.
Regarding waivers for this project, the first one is related to curbing and it’s a request for the partial
elimination of curbing. There are areas of the existing parking lot that do not contain upright
curbing and they would like to recognize that existing condition as improvements to those areas of
the parking lot are not anticipated. There’s a portion of what they call the north pad site area that is
currently a paved area that will turn into a green space in the intervening time which will also not
have curbing until ultimately its final design. There are kind of two (2) aspects for the partial
elimination of curbing. They are showing dumpster information. The other significant items with
the project are related to landscaping. There is a tree planting requirement and since they are
28
Page 33
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
focused on the main building, Staff is suggesting utilizing a project site area that focuses just on that
building and its parking lot areas. Basically by pulling out the two (2) pad site areas, those areas
will be addressed in the future for those tree planting requirements. With that said, the project still
for what’s presented today requires one hundred ten (110) trees. Their initial plan that was
submitted showed significantly less than that but the applicant has indicated their willingness to
continue to work on finding homes for trees on their site. One of those potential homes of course
would be along the arterial street buffer that is required along the Route 13 Corridor. This is where
the second waiver is found. That arterial street buffer is required to be thirty (30) feet in width. It is
proposed at thirty (30) feet for the most part; however, there are areas in the parking lot that reduce
down to twenty (20) feet so the applicant is seeking a reduction in the width of the arterial street
buffer. The third waiver is related to an alternative format of the opaque component of the opaque
barrier. The opaque barrier is required along the east property line where this non-residential project
is adjacent to the residential area. There is an existing chain link fence with slats in that area which
if accepted, can count towards meeting the opaque barrier aspect and then they will also have to
address a landscape planting component along that property line.
There will be some opportunities for green space and recognizing that the two (2) pad sites are kind
of placeholders at this point in time. The Planning Office has identified a series of comments with
the project. Specifically, they provided recommendations on all three (3) of the waiver requests and
they are in support of them. They are noting that they are continuing to evaluate pedestrian
circulation and how that system of sidewalks throughout the site from the street frontage sidewalks
can occur. As always with the Development Advisory Committee Report, there are comments from
other agencies including the Department of Public Works and Electric for the City and the City’s
Fire Marshal’s Office. They have already been working with DelDOT since Route 13 is State
maintained road and actually did perform a Traffic Operational Analysis which has helped push the
concept of changing the entrance configuration along Townsend Boulevard even though it is a City
street. They have also been working with the Kent Conservation District.
Mr. Kuklish stated that they did have two (2) comments. They do agree with everything that was
mentioned by Mrs. Melson-Williams. Secondly, on February 9, 2016 he, Mr. Steve Hutchinson and
they DDR Corp met with the White Oak Farm/Towne Pointe Association behind them at the
elementary school. They reviewed the project, spoke through questions and comments and they (the
community) were very much in support of the project, very happy to hear about the entrance getting
realigned and the pedestrian connections getting extended on both Route 13 and Townsend
Boulevard.
Mr. Cregar questioned if they could share who might be going in the building? Responding to Mr.
Cregar, Mr. Kuklish stated that they could not discuss tenants at this time. They can safely state that
they are in final negotiations with two (2) national retail tenants. Once those leases are final they
will be able to state who there are.
Mr. Cregar further questioned that it is two (2) tenants? Responding to Mr. Cregar, Mr. Kuklish
stated yes.
Colonel Welsh thanked the applicant for taking over an eyesore for the City from the past several
years since Kmart has shut their doors. Even before they closed it wasn’t a particularly attractive
building. Are there any plans for architecture modifications to at least the external portion of the
29
Page 34
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
building? He knows there will be modifications on the inside. Responding to Colonel Welsh, Mr.
Kuklish stated yes, plans for the two (2) proposed tenants will be to put new facades or faces on the
building with new entrance features for both tenants.
Colonel Welsh stated that a really nice model is the old Walmart location. He was by that location
today and they have done such a great job with that project. The way they have staggered the roof
line and the way they have staggered the frontage of the buildings. He knows they the applicant
probably won’t be able to do that but if they could do something with the façade to dress that up so
that they don’t have a flat roof, long building with no windows. He is a little disappointed that they
don’t have elevations and he would ask Staff why there are no architectural requirements for the
Commission to review when this application comes forward. Responding to Colonel Welsh, Mrs.
Melson-Williams stated that in this case it’s really the site improvements that are generating the
need to be here in front of the Commission. If they were making no changes to the parking lot at all
it could be reviewed through a zoning review of the Building Permit. It’s the impacts to the site that
they are doing in changing the entrance and the site disturbance activities that brings it in front of
the Planning Commission because of it being adjacent to residential.
Colonel Welsh stated that perhaps they need to look at changes that can be made because one of the
charges that they have is to ensure that it is architecturally pleasing and in compliance with the rest
of the neighborhood. They have a chance to make a big difference here and take what he has always
thought to be an eyesore in the City of Dover, especially on the main corridor through Dover and
dressing it up a little bit making a significant improvement. He thinks that’s part of their
responsibility to ensure that happens. Responding to Colonel Welsh, Mrs. Townshend stated that
they were going to be talking about architectural review tomorrow at the Planning Commission
Workshop.
Colonel Welsh stated that it wasn’t required of the applicant tonight but he would appeal to their
community responsibilities and good citizenship to do what they can to make it an attractive
building. He’s sure the new buildings are going to be attractive buildings but that old Kmart
building needs a lot of work.
Mr. Tolbert questioned if the applicant had an architectural rendering of some sort from an architect
on what the final building is going to look like? Responding to Mr. Tolbert, Mr. Kuklish stated that
they have conceptual renderings at this time; they do not have anything that’s final.
Mr. Cregar questioned if this came up at the public meeting? Did the public ask what the building
was going to look like? Responding to Mr. Cregar, Mr. Kuklish stated yes; they had concerns about
what the building was going to look like.
Mr. Cregar further questioned if they were able to share at least conceptually with them what the
building will look like? Responding to Mr. Cregar, Mr. Kuklish stated yes; they do have conceptual
elevations that he can share.
Mr. Cregar stated that he was sitting in the parking lot of Safeway and he is looking at the trees
planted in the parking lot and looking at the trees that are no longer in the tree plantings in the
parking lot. He knows how frequently they re-plant, they take down or they get bent. What are the
options for these developers to try to come up with one hundred ten (110) trees? Responding to Mr.
30
Page 35
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Cregar, Mrs. Melson-Williams stated that they have some opportunities along the perimeters of the
site. There is also a portion of the site that’s in the SWPOZ (Source Water Protection Overlay Zone)
which can’t be impervious so there are certainly opportunities there. Often times with the parking
lot re-developments they see the creation of islands, not the diamond shaped islands that tend to
mean the tree gets hit like in the Safeway lot. These are larger type islands that would give the tree
more protection and it potentially helps the circulation patterns of the parking lot in general as well.
Mr. Holt stated that looking at the chain-link fence that’s up in the back of the site; those things get
pretty ratty looking. He feels like a landscape of some kind, whether it is a hedge or trees, it would
like a lot more attractive. They are proposing to add evergreens along the fence.
Mr. Holt stated that he thinks that would help improve a lot. Those chain-link fences after a few
years get really ratty and nobody seems to be able to correct and it looks bad for a long period of
time.
Colonel Welsh asked to look at the conceptual renderings.
The applicant handed out copies of the conceptual elevation for the main building to the Planning
Commissioners.
Mrs. Melson-Williams stated that it appears that there is certainly an entrance element added for
each of the tenant spaces.
Colonel Welsh stated that it’s certainly an improvement. If they could do something with the ends
of the buildings to maybe raise the roof line a little bit and maybe break that up a little bit.
Responding to Colonel Welsh, Mr. Kuklish stated that those are conceptual; they are still working
on things.
Mr. Holden questioned if the applicant planned to re-surface the parking lot? Responding to Mr.
Holden, Mr. Kuklish stated that their plan right now is to re-seal and re-stripe.
Mr. Hutchison stated that its one way circulation now and they are going to re-stripe the parking to
increase efficiency.
Mr. Holden further questioned if they have come to a proposed path to address source water
protection and maybe how that rolls into stormwater? Responding to Mr. Holden, Mr. Kuklish
stated that looking at a number of things, there’s currently existing parking spaces in the northeast
corner of the site furthest from the front door; not many customers will park their and use the store
entrance. Those parking spaces are in the SWPOZ (Source Water Protection Overlay Zone). They
are looking at making that a green area, not only for adding pervious but also for tree opportunities.
There may also be some opportunity to skinny up the drive aisle of the truck circulation to again
add pervious area.
Mr. Tolbert opened a public hearing.
Mr. William Heinz – GPM Investments, LLC 410 Monmouth Place Newark DE 19702
31
Page 36
CITY OF DOVER PLANNING COMMISSION FEBRUARY 16, 2016
Mr. Heinz stated that he represents the landlord of the Valero gas station across the street. He wants
to know more about the pad sites; it’s listed as retail or restaurant. Responding to Mr. Heinz, Mr.
Kuklish stated that they are only place holders at this point.
Mr. Heinz stated that’s what he thought and then some point in the future when they do have
something more definite then it will be re-opened so it can be looked at again? Responding to Mr.
Heinz, Mr. Kuklish stated yes.
Mr. Tolbert closed the public hearing.
Mr. Tolbert questioned when they approve or disapprove the application, what are they voting on?
Responding to Mr. Tolbert, Mrs. Townshend stated that the pad sites are not before the
Commission, it’s the larger site. The pad sites will come back to the Commission.
Mr. Holt moved to approve S-16-02 Capital Commons at 505 & 515 North DuPont Highway to
include the waivers for reduction in arterial street buffer, partial elimination of curbing and opaque
barrier alternative format, seconded by Ms. Still and the motion was unanimously carried 8-0 by
roll call vote with Mr. Ambruso absent. Mr. Holden voting yes; it’s great to see some redevelopment
at this site and it looks like a good plan. He also appreciates the applicant bringing back the pad
sites in the future without knowing what they are going to be now. Mr. Cregar voting yes; it meets
the DAC requirements and they have done an excellent job of trying to re-develop this property
because it’s needed and it will benefit the community. Colonel Welsh voting yes; he thinks that it’s a
welcomed improvement to the City of Dover and he trusts that the developer is going to do to
everything that he can to make it a beautiful store. Mr. Holt voting yes; the re-development is much
needed and will be a big asset to the City of Dover. Mr. Baldwin voting yes; it’s good to see some
movement on the old Kmart building. Dr. Jones voting yes; it’s a much welcomed addition to that
area. Ms. Still voting yes; she thinks it will be a great improvement. She has lived in White Oak
since 1965 and Kmart hasn’t changed since it was built so she will be looking forward to a really
exciting new look there. Mr. Tolbert voting yes; the old Kmart is an eye sore on the main roadway
in Dover and what they are looking at is going to be an asset to the area and it’s going to be a
welcomed site.
Meeting adjourned at 9:56 PM.
Sincerely,
Kristen Mullaney
Secretary
32
Page 37
MEMORANDUM
Department of Planning & Inspections
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
DATE: March 3, 2016
TO: Planning Commission
FROM: Planning Office
SUBJECT: S-16-04 Dover Behavioral Health Systems: Phase I, 4-Bedroom Addition at 725
Horsepond Road
Parking Waiver Request
Background
Application S-16-04 was submitted to the Planning & Inspections Department on February 1, 2016 for
administrative review. The project proposes a 1,400 S.F. four bedroom addition to the Dover
Behavioral Health building at 725 Horsepond Road. Under the Zoning Ordinance, Article 10 §2.14 this
project qualified for Administrative Site Plan Review due to the small size of the building addition
versus the existing building.
Based on Zoning Ordinance, Article 6 §3, parking for this site is calculated based on number of beds or
based on building square footage as specified in Article 4 – Zoning Bulk and Parking Regulations,
whichever is greater. In this case, the calculation based on building square footage yields a greater
number of required parking spaces. The existing building on site is 59,105 S.F, which calls for a total of
198 spaces at a rate of one space per 300 S.F of floor area. The applicant is currently in possession of a
waiver from the Planning Commission dated December 7, 2011 to allow the building to be served by
161 spaces currently on site.
The size of the building addition would require the site to be served by an additional four (4) parking
spaces. The applicant has requested a new waiver to allow the site to continue to be served by 161
parking spaces. This waiver cannot be processed administratively.
Recommendation
Staff recommends the Planning Commission waive the requirement for four additional parking spaces
on site and allow the site to continue to be served by 161 parking spaces. The applicant has submitted
documentation indicating that the parking currently on site is well in excess of the facility’s current
needs. Additional demand for parking generated by the building addition will be met by parking
spaces currently unused on site.
Per Zoning Ordinance, Article 6 §3.9, an area of open space on the site plan has been designated as a
reserved parking area. The area reserved is adequate to accommodate the four additional parking
spaces if in the future the Planning Commission determines there is a need for the spaces to be built.
Page 38
MEMORANDUM
Department of Planning & Inspections
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196
DATE: March 4, 2016
TO: Planning Commission
FROM: Planning Office
SUBJECT: Revised Plan Information
C-13-11 Dover Christian Church at 1738 Forrest Avenue, Dover
Tax Parcel: ED-05-075.00-01-04.00-000
This Conditional Use Site Plan application C-13-11 Dover Christian Church is presented to the
Planning Commission as information regarding a series of proposed plan revisions including a
reduction in building size, reductions in the number of parking spaces, reduction of impervious
surface coverage, revision to type of stormwater management facility, and building architecture and
materials changes.
The Dover Christian Church property is located on the south side of Forrest Avenue and west of
Dover High Drive. Initially on October 21, 2013, the City of Dover Planning Commission granted
conditional approval of the Conditional Use Site Plan for construction of a one-story 9,600 SF place
of worship (church building) in accordance with the conditions of approval including the Staff
Recommendations outlined in the Development Advisory Committee (D.A.C.) Report dated
October 9, 2013. At its meeting of August 17, 2015, the City of Dover Planning Commission
granted one-year extension for the Conditional Use Site Plan Application C-13-11. As a result of
this extension, the plan approval for this project will expire on October 31, 2016.
For the Dover Christian Church project, the applicant has provided a summary letter listing the
proposed revisions and copies of the Revised Site Plan and Landscape Plan along with the revised
building renderings. The applicant continues to work with Planning Staff and the other review
agencies in the Check Print Review process to achieve Final Plan approval in order to commence
construction.
Page 39
March 1, 2016
Mrs. Dawn Melson-Williams, AICP
City of Dover
PLANNING OUR Department of Planning and Inspections
CLIENTS’ SUCCESS P.O. Box 475
Dover, DE 19903-0475
RE: Conditional Use Approval Update
PROPOSED DOVER CHRISTIAN CHURCH
Dover, Delaware
2012072.02
Dear Mrs. Melson-Williams:
On behalf of our client, Dover Christian Church, we are hereby submitting revised plans for the
previously approved Conditional Use Application. This is submitted for consideration at the March
21st Planning Commission Meeting, under old business. It is our understanding that the changes we
discussed in a meeting on July 23, 2015 and as outlined below will not require the project to go back
through the public hearing process, however we would like the Planning Commission to be informed
of the changes that were made. We are providing the following:
1. Fifteen (15) copies of the Site Plan and Landscape Plan (Sheets C-001 and L-101)
2. Fifteen (15) copies of the building renderings.
3. A CD containing PDF’s of the plan sheets and architectural renderings.
Due to stormwater limitations of the site and overall budget concerns, the following changes have been
made to the plans:
a. Building square footage was reduced from 9,600 to 3,850 (approximate). In addition, the
building was shifted to the west to accommodate a stormwater facility since it was found that
an underground stormwater infiltration system was not feasible as previously shown.
b. Parking was reduced from 67 spaces to 40 spaces.
BECKER MORGAN GROUP, INC.
c. Impervious coverage was reduced from 62.9% to 48.2%.
d. The exterior materials of the building was generally revised from masonry and metal paneling
A RCHITECTURE & E NGINEERING to brick and siding.
309 SOUTH GOVERNORS AVENUE
DOVER, DELAWARE 19904 Please feel free to contact me if you require any additional information.
302.734.7950
FAX 302.734.7965 Sincerely,
RITTENHOUSE STATION
250 SOUTH MAIN STREET, SUITE 109 BECKER MORGAN GROUP, INC.
NEWARK, DELAWARE 19711
302.369.3700
PORT EXCHANGE
312 WEST MAIN STREET, SUITE 300 Jon S. Falkowski
SALISBURY, MARYLAND 21801 Associate
410.546.9100
FAX 410.546.5824
RJM/jsf
A RCHITECTURE & PLANNING
3205 RANDALL PARKWAY, SUITE 211
Cc: Waldberge Bryant – Dover Christian Church, Inc.
WILMINGTON, NORTH CAROLINA 28403
910.341.7600 201207202as-ltr.doc
FAX 910.341.7506
www.beckermorgan.com
Page 40
PETITION TO ANNEX AND REZONE PROPERTY
Public Hearing Before the
Dover Planning Commission
March 21, 2016
Applicants/Owners: Capitol Cleaners & Launderers Inc.
Property Address: 1102 South State Street
Tax Parcel ID #: ED-00-086.05-01-46.02-000
Size: 6,331 SF
Present Use: Commercial
Proposed Use: Commercial
Comprehensive Plan Designation: Category 1 – High Priority Annexation Areas
Comprehensive Plan Land Use Designation: Commercial
Present Zoning: BG (General Business)
Proposed Zoning: C-2A (Limited Central Commercial)
Utility Availability: The property is currently served by City of Dover Electric and
Water. There is sanitary sewer service available to the north of this
property, specifically within the property of 1074 South State
Street, to serve this property, private easement agreements will be
required from 1074 and 1086 South State Street. The property
owner would be responsible for the costs associated with tapping
the sanitary sewer mains extending services to the property,
payment of impact fees, costs of all private easements and
obtaining permits associated with such improvements.
File Number: AX-16-01
Page 41
AX-16-01- Lands of Capitol Cleaners and Launderers Inc.
DAC Report – March 9, 2016
Page 2 of 3
This application is for the annexation and rezoning of property located at 1102 South State
Street. The property is owned by Capitol Cleaners and Launderers Inc. The Tax Parcel
Identification Number is ED-00-086.05-01-46.02-000.
Existing Property:
The property consists of one parcel located on South State Street, north of the intersection with
South DuPont Highway. The parcel includes the front portion of an existing building. The
property line goes through the building. The rear portion of the building (on a separate lot) has a
different owner and is not proposed for annexation.
Surrounding Land Uses:
The surrounding uses are commercial properties. Surrounding properties located in
unincorporated Kent County are zoned BG (General Business). The properties located
immediately north of the subject property are zoned C-2A in the City of Dover. The properties
across South State Street are zoned C-4 (Highway Commercial) and SC-2 (Community Shopping
Center).
Comprehensive Plan:
In the 2008 Comprehensive Plan, this property is identified as a Category 1 (High Priority)
Annexation Area with a land use classification of Commercial.
Request for C-2A (Limited Central Commercial Zone)
The types of permitted uses in the C-2A (Limited Central Commercial Zone) are given Article 3
§14 of the Zoning Ordinance, and include the following: retail stores; business, professional or
governmental offices; personal service establishments; restaurants; service establishments;
hotels; places of public assembly; drive-throughs; one family residences, including attached and
semi-detached dwellings, complying with the bulk standards of the RG-1 (General Residence)
zone; apartments and multi-family dwellings. The following are permitted as conditional uses,
subject to approval by the Planning Commission: parking lots and structures; and fuel pumps
accessory to a permitted use.
Recommendation of the Planning Staff:
Staff recommends that annexation of the property and the rezoning to C-2A (Limited Central
Commercial) be approved as submitted. The subject property is in the City’s Category 1 (High
Priority) Annexation Area. The proposed zoning classification is consistent with the
Comprehensive Plan and with the zoning of the immediate area.
This recommendation is being made without that benefit of hearing the comments of surrounding
landowners and residents. A public hearing is required on this matter and the Planning
Commission should give those comments consideration.
ADVISORY COMMENTS TO THE APPLICANT:
1) The applicant shall be aware that approval of any rezoning application does not represent Site
Development Plan or Record Plan approval. A separate Site Development Plan must be
submitted and approved if development activities are proposed on the property. A separate
Record Plan must be submitted and approved if changes to existing property lines are
Page 42
AX-16-01- Lands of Capitol Cleaners and Launderers Inc.
DAC Report – March 9, 2016
Page 3 of 3
proposed.
2) The applicant shall be aware that approval of any rezoning application does not represent a
Building Permit or other construction activity permit approval. A separate application
submission showing all improvements is required before issuance of permits by the City of
Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Office as soon as possible.
Page 43
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 2, 2016
APPLICATION: LANDS OF CAPITOL CLEANERS & LAUNDERERS,INC.
AT 1102 SOUTH STATE STREET
FILE #: AX-16-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. Our office has no objections to the proposed annexation of tax parcel ED-00-086.05-01-46.02-000
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. None
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER
1. None.
WATSTEWATER
1. As per the Petition to Annex and Rezone Property, as heard by the City of Dover Utility Committee, February 22,
2016, please find the following:
a. The property is currently served by City of Dover Electric and Water. There is sanitary sewer service available to
the north of this property, specifically within the property of 1074 South State Street, to serve this property, private
easement agreements will be required from 1074 and 1086 South State Street. The property owner would be
responsible for the costs associated with tapping the sanitary sewer mains extending services to the property,
payment of impact fees, costs of all private easements and obtaining permits associated with such improvements.
Wastewater infrastructure must be installed in accordance with the requirements of the City of Dover Water /
Wastewater Handbook.
Page 44
Lands of Capitol Cleaners & Launderers, Inc., 1102 South State Street
File #: AX-16-01
March 2, 2016
Page 2 of 2
SANITATION
1. The City of Dover will only provide sanitation service to residential properties. Therefore, this property shall be served
by a private contractor.
STORMWATER / STREETS / GROUNDS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 45
C F
I I
AX-16-01 T R
Y E
CITY OF DOVER
O M
DEVELOPMENT ADVISORY COMMITTEE F A
R
APPLICATION REVIEW COMMENTARY
D S
th
D.A.C. MEETING DATE: March 9 , 2016
O H
V A
E L
R
APPLICATION: Lands of Capitol Cleaners & Launderers, Inc. at 1102 South State Street
FILE #: AX-16-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Timothy P. Mullaney Jr., Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. This office has no objection to the annexation or rezoning.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2012 NFPA Life Safety Code (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2012 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 46
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 2, 2016 T
===============================================================
APPLICATION: Lands of Capitol Cleaners & Launderers, Inc. at 1102 South State
Street.
FILE#: AX-16-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no advisory comments at this time.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 47
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
March 2016
APPLICATION: Lands of Capital Cleaners & Launders Inc.
FILE #: AX-16-01
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE
FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE
APPLICANT:
Source: 2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. Kent Conservation District has no objection to the annexation and rezoning of the above referenced site.
ADVISORY COMMENTS TO THE APPLICANT:
1. If at any time expansion or earth disturbing activity (clearing, grubbing tree clearing etc.) takes place and
exceeds 5000 square feet; a detailed Sediment and Stormwater Management Plan must be submitted and
approved to the Kent Conversation District.
Page 48
City of Dover Application No.: AX-16-01
Department of Planning & Inspections
C-2A
SC-2
Sta te St
Site
C-4
d
tR
ree
St
a te
St
y
t Hw
p on
Du
C-4
Title: Lands of Capitol Cleaners & Launderers
Legend
Address: 1102 South State Street Dover Boundary
Parcel ID: ED-00-086.05-01-46.02-000
Proposed Zoning: C-2A (Limited Central Commercial Zone) Zoning
Owner: Capitol Cleaners & Launderers, Inc. Dover Parcels
Date: 2/2/2016
Kent County Parcels
Subject Property
« 0 60 120 240 Fee t
2012 Buildings
Page 50
City of Dover
DATA SHEET FOR CONDITIONAL USE SITE PLAN
DEVELOPMENT ADVISORY COMMITTEE MEETING OF March 9, 2016
PLANNING COMMISSION MEETING OF March 21, 2016
Plan Title: Duplexes at West Reed and South Kirkwood Streets (C-16-03)
Plan Type: Conditional Use Site Plan with Minor Subdivision Plan
Property Location: On the east side of South Kirkwood Street just south of West Reed Street
Property Addresses: 420 W. Reed Street, 105 South Kirkwood Street, 107 South Kirkwood
Street
Applicant: MauTiste Investment Group c/o Michael Maupin
Tax Parcel: ED-05-076.12-02-65.00-000, ED-05-076.12-02-64.00-000, ED-05-
076.12-02-63.00-000
Zoning: RG-1 (General Residence Zone)
Proposed Lots: 6 home lots
1,673 SF to 2,345 SF
Proposed DU: 6 duplex units (3 structures)
Site Area: Project Total: 10,781 SF +/- (0.2474 ac. +/-)
Sewer & Water: City of Dover
Related Application: V-16-01 related to setbacks, lot area, and lot coverage in RG-1
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 51
City of
Dover
CITY OF DOVER
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: March 9, 2016
APPLICATION: Duplexes at West Reed and South Kirkwood Streets
FILE #: C-16-03 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Bill Cook, Planner PHONE #: (302) 736-7196
PLAN SUMMARY
This is Review of a Conditional Use application to construct three (3) duplex buildings for a total
of six (6) dwelling units. The project includes a Minor Subdivision Plan to reconfigure the
existing lots fronting on South Kirkwood Street into six (6) lots fronting on Reed Street. Each of
the six lots is proposed to be between 1,673 SF and 2,345 SF in area. The total property is 10,781
SF (0.247 acres) and is zoned RG-1 (General Residence Zone). The property is located on the
east side of South Kirkwood Street just south of Reed Street. The owner of record is MauTiste
Investment Group. Property Addresses: 420 W. Reed St., 105 S. Kirkwood St., 107 S. Kirkwood
St. Tax Parcels: ED-05-076.12-02-65.00-000, ED-05-076.12-02-64.00-000, ED-05-076.12-02-
63.00-000.
The property at 420 West Reed Street has an existing building formerly known as the Square
Club which is planned for demolition by the applicant in preparation for redevelopment.
Related Applications
Application V-16-01 was approved by the Board of Adjustment at its meeting of February 17,
2016 to approve a variance from the requirements of Zoning Ordinance, Article 4 §4.2 pertaining
to the minimum lot dimensions, minimum setbacks, and maximum lot coverage for duplex/one-
family semi-detached dwellings in the RG-1 zone.
The subject properties are located within the boundaries of the city’s Downtown Development
District, making a variety of incentives available for construction projects that promote
investment within the district. They are also within the Restoring Central Dover study area. Both
Restoring Central Dover and the Downtown Development District designations place a priority
on improving housing stock and increasing home ownership. This project has received a large-
project grant reserve through the Downtown Development District program.
CONDITIONAL USE:
The proposed use as duplex/one-family semi-detached dwellings is permitted as a Conditional
Use subject to Planning Commission approval in the RG-1 zone as outlined in Zoning Ordinance
Article 3 §2.4.b. (excerpted):
Page 52
C-16-03 Duplexes at W. Reed St. and S. Kirkwood St.
DAC Report of March 9, 2016
Page 2
Article 3, Section 2
2.4 Conditional uses. The following uses are permitted, conditional upon the approval of the
planning commission in accordance with the procedures and subject to the general conditions set
forth in article 10, section 1:
(a) Townhouses subject to the following restrictions:
i. No more than one dwelling unit shall be permitted upon a lot.
ii. No more than four dwelling units shall be permitted in a group of townhouses.
iii. Each group of townhouses shall be physically separated from another by no less than
two dwelling units of a different housing type from other groups of townhouses on the
same side of the street.
iv. Townhouse groups shall be designed to minimize points of access to the public street
and to take access from an alley or other shared access where such access is available.
(b) Duplex dwellings subject to the following restrictions:
i. No more than one dwelling unit shall be permitted upon a lot
ii. Duplex dwellings shall be designed to minimize points of access to the public street and
to take access from an alley or other shared access where such access is available.
Recent Zoning Ordinance amendments (Ordinance #2015-13, adopted October 12, 2015) made
townhouses and duplexes permitted dwelling types in the RG-1 and RG-2 zones, subject to
Conditional Use approval and specific restrictions.
Guidelines for infill development were also included in the amendments to direct the design of
façade orientation, sidewalks and landscaping as noted in Zoning Ordinance Article 5 §1.12:
Article 5, Section 1
1.12 Infill Standards. In locations where a lot or group of lots lies within a developed area, the
following standards shall apply to the development of the infill lots:
(a) Sidewalks. Standard City of Dover sidewalk, per chapter 98, shall be required to be
installed along public street frontage of every infill property by the property owner
or developer.
(b) Landscaping. Infill structures shall be designed to minimize the impact on existing,
mature trees when practical. All residential lots shall include landscaping to include
plants and shrubs along the portions of the house that front a public street. No form
of vegetation shall be planted on a property in a way that blocks more than half of the
front façade(s) from public view.
(c) Primary facade. All buildings shall include a primary entry along the property’s
street frontage, and shall also include a porch or other entry feature.
SITE CONSIDERATIONS
Parking
Zoning Ordinance Article 4 §4.2 "Zoning Bulk and Parking Regulations" for RG-1 requires a
minimum of one (1) off-street parking space per dwelling unit. The proposed lots for this
subdivision include driveways at the front of each lot with a parking space that meets the
required size for one (1) parking space.
Surfacing is not specified on the plan. Per requirements of Zoning Ordinance Article 6 §3,
surfaces must be "paved asphalt, concrete or other hard, paved, dust-free surface." Other
departments may require detail sheet(s) related to paving.
Page 53
C-16-03 Duplexes at W. Reed St. and S. Kirkwood St.
DAC Report of March 9, 2016
Page 3
Trash
Trash pickup will be from Reed Street. Code requires screening of trash receptacles from the
public right of way. The submitted plan shows shared enclosures between dwelling units, located
in the front of each building straddling the common wall lot line. The enclosures should consist
of sturdy materials that complement the architecture of the primary structures and appear
consistent with expectations for a residential neighborhood.
Sidewalks
Sidewalks are required along the property’s street frontages on South Kirkwood Street and Reed
Street. There is existing sidewalk along the Kirkwood Street frontage, but the condition and state
of any curb cuts is unknown at present. Sidewalks must be shown on the final plan. Other
departments may require detail sheet(s) related to paving & curbing. Refer to Zoning Ordinance
Article 5 §18 for requirements and references to construction standards.
BUILDING LAYOUT AND SITING
Architecture
The proposed two-story buildings have two dwelling units per building. Each dwelling unit has 3
bedrooms, 1 bathroom and 2 half-bathrooms. A rendering of the building model is provided. The
structures are conventional wood frame buildings with siding and asphalt shingle roofs.
Infill standards found in Zoning Ordinance, Article 5 §1.12 related to the development of infill
lots require the primary façade to be placed to face the property's street frontage, and shall also
include a porch or other entry feature. The renderings presented show entry porches over the
front doors. Such structures are permitted encroachments into required setbacks if they meet size
conditions found in Zoning Ordinance, Article 5 §1.5.
Site Design
Zoning Ordinance, Article 3 §2.4.b related to duplex dwellings as a Conditional Use states that
“duplex dwellings shall be designed to minimize points of access to the public street and to take
access from an alley or other shared access where such access is available.”
The initial plan submission for this project placed the structures close to the front lot line with
parking located in the rear, accessed by a 12-foot driveway/alley entered from South Kirkwood
Street which was planned to be dedicated to the City. Following discussions with the applicant,
Planning Department and other City departments, the siting of the project was modified to
eliminate the rear access drive, move the houses farther back from the front lot line, and provide
parking in the front of the dwellings.
The segment of Reed Street in front of the project site is one-way heading west towards South
Kirkwood Street. Parking will not be permitted on the street.
Zoning Ordinance Article 6 §5.3 related to supplementary parking regulations states as follows:
Article 6, Section 5.3
Supplementary parking regulations for multiple dwellings, including duplexes, multiplexes, and
apartments. No parking space shall be located in any front yard or within three feet of any lot line in
side or rear yards. The parking of motor vehicles within 15 feet of any wall or portion thereof, which
Page 54
C-16-03 Duplexes at W. Reed St. and S. Kirkwood St.
DAC Report of March 9, 2016
Page 4
wall contains legal windows (other than legal bathroom or kitchen windows) with a sill height of less
than eight feet above the level of the said parking space is prohibited. No service of any kind shall be
permitted to be extended to users of the lot, including automobile service, repair or fueling, and no
gasoline, oil, grease, or other supplies shall be stored or sold in any such lot or in any garage on
such lot.
The ordinance currently prohibits parking in the front yard setbacks of the proposed project. A
text amendment is being introduced at the Legislative, Finance, and Administration Committee
meeting on March 15, 2016 to eliminate duplexes from that provision. This would make the
regulation consistent with other provisions throughout the Zoning Ordinance which do not
include duplexes when referencing multi-family dwellings.
Lot Standards
Application V-16-01 was approved by the Board of Adjustment at its meeting of February 17,
2016 to approve a variance from the requirements of Zoning Ordinance, Article 4 §4.2 pertaining
to the minimum lot dimensions, minimum setbacks, and maximum lot coverage for duplex/one-
family semi-detached dwellings in the RG-1 zone.
The approved variances are outlined in Table 1. Due to the subsequent change in the subdivision
plan that eliminated the rear alley/driveway, the lot dimensions have been modified. Staff will be
taking case to the Board of Adjustment at its April 20, 2016 meeting as “old business” to modify
the requested variances.
Table 1: Zoning Requirements and Approved Bulk Standards
C-16-03 Duplexes at W Reed St and S Kirkwood St
V-16-01 Lands of MauTiste Investment Group
RG-1 (General Residence Zone)
For All Permitted Uses:
Duplex/One-Family Semi-Detached Dwellings
Minimum Required: REQUIRED APPROVED [1]
P6 P5 P4 P3 P2 P1
Lot area (sq. ft.) 5,000 1,446 1,399 1,396 1,394 1,391 1,949
Lot width (ft.)
25 23 23 23 23 23 32
per dwelling unit (DU)
Lot depth (ft.) 100 59 59 59 59 59 58
Front yard (ft.) 15 6 6 6 6 6 6, 11.5
Side yard (ft.) 10 3.17 2.5 2.5 2.5 2.5 [2]
Rear yard (ft.) 30 25 25 25 25 25 25
Off-street parking
1 1 1 1 1 1 1
spaces/DU
Maximum Permitted:
Building height
Stories 2½ 2 2 2 2 2 2
Feet 35 -- -- -- -- -- --
Lot Coverage 50% 64% 66% 67% 67% 67% 48%
Notes:
[1] Criteria requiring variance are in italics .
[2] Corner lots have two front yards
Page 55
C-16-03 Duplexes at W. Reed St. and S. Kirkwood St.
DAC Report of March 9, 2016
Page 5
TREE PLANTING AND LANDSCAPE PLAN
All developments in non-woodland areas requiring approval of the Planning Commission are
required to submit a tree preservation and planting plan as set forth in Article 5 §16.6. The
submitted plan does not include the required Landscaping details.
Required tree density is one (1) tree per 3,000 SF of lot area or fraction thereof. Refer to the
ordinance for definitions and standards for new trees. Based on the total 10,781 SF area of the
proposed Minor Subdivision, four (4) trees are required.
Infill standards in Article 5 §1.12 require landscaping to include plants and shrubs along portions
of the house that front a public street. Additionally, refer to landscape guidelines found in Article
5 §15. Any existing trees planned for removal should be identified on the required tree
preservation, planting, and selective clearing plan as specified in Article 5 §16.8.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) Continue to work with Staff in completing the plan for Final Plan Approval.
2) The following information should be included on the Cover Sheet, or on other sheets as
appropriate (code reference Zoning Ordinance Art. 10 §1.7 and §2.5):
a. Other existing development such as fences.
b. Proposed grading, screening and other landscaping.
c. Paved surface for driveways is not specified. Per code requirements, a hard dust-
free surface is required. All paved surfaces including steps, pads, etc. should be
shown on the plan.
d. Public sidewalks must be constructed in accordance with City code.
3) Cover Sheet: Please add/correct the following:
a. Show scale and scale bar.
b. Add a note to the data column with the off-street parking required and the parking
provided.
c. Add a note to the data column with a brief narrative description of the proposed
Conditional Use.
d. Add a note to the data column referencing approved variances, with the date of
decision.
e. Show impervious surface calculation for each lot.
4) Record Plan- Lot Lines to Extinguish:
a. Name and address of the owner of record.
5) Record Plan- New Lot Lines:
Page 56
C-16-03 Duplexes at W. Reed St. and S. Kirkwood St.
DAC Report of March 9, 2016
Page 6
a. Name and address of the owner of record.
b. Label names and existing widths of adjacent street rights-of-way and curb lines.
Full width of the rights-of-way should be shown.
c. Remove the proposed buildings. This plan should show only lot lines and
easements.
d. Add a note to the data column referencing approved variances, with the date of
decision
6) Utility/Stormwater Plan:
a. Consult with Kent Conservation District and Department of Public Works.
7) Landscape Plan: A Tree Planting and Preservation Plan demonstrating compliance with
requirements for tree planting is required:
a. Submission of the plan is required prior to Final Plan approval.
b. Compliance with the plan will be confirmed by site inspection prior to approval of
a permanent Certificate of Occupancy.
c. As an advisory comment to the applicant, no Building Permit can be issued prior to
Final Plan approval.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) Staff recommends that a 3-foot wide sidewalk connect the driveway with the front steps
of each unit. The sidewalk should project forward of the steps towards the street then
form a 90-degree angle to connect to the driveway.
2) Enclosures have been added to the front of the units to screen trash receptacles.
Enclosures should be sized to accommodate trash and recycling containers.
3) Staff recommends that siding colors vary among the structures.
4) Staff recommends that the Landscape Plan to be submitted consider additional plantings
in the yard of lot P1 facing South Kirkwood. Plant materials should vary in height, be
hardy and low-maintenance, and include a mix of evergreen and deciduous plants,
shrubs, and trees.
5) Staff recommends that driveways and sidewalks be surfaced in concrete.
ADVISORY COMMENTS TO THE APPLICANT:
1) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
2) Following Planning Commission approval of the Conditional Use Site Plan and Minor
Subdivision Plan, the Plan must be revised to meet all conditions of approval from the
Page 57
C-16-03 Duplexes at W. Reed St. and S. Kirkwood St.
DAC Report of March 9, 2016
Page 7
Development Advisory Committee or as otherwise noted. A Check Print must be submitted
for review by Planning Office Staff. Upon determination that the Plan is complete and all
agency approvals have been received, copies of the Plan may be submitted for final
endorsement.
3) In the event that major changes and revisions to the Site Plan occur in the finalization of the
plan contact the Department of Planning and Inspections. Examples include reorientation of
building, relocation of site components like stormwater management areas, and increases in
floor area. These changes may require resubmittal for review by the Development Advisory
Committee, Planning Commission, or other agencies and commissions making
recommendations in regards to the plan.
4) All design professionals signing/sealing the plan are required to have a City of Dover
Business License. Contact the Permit & Licensing Section at (302)-736-7010 regarding the
licensing procedures.
5) Two-hour fire separation is required between attached units to comply with building code
requirements.
6) Construction activities will have an effect on the adjacent property owners and to travel lanes
and/or shoulder area of the adjacent roadway. Any work requiring the closing or rerouting of
potential residents or visitors to adjacent properties should be coordinated as to offer the least
amount of inconvenience to the adjacent property owners and the roadway.
7) For building new construction, the requirements of the building code and the fire code must
be complied with. Consult with the Chief Building Inspector and City of Dover Fire Marshal
for these requirements. The resolution of these items may impact the site design including
such items as building dimensions and height, building openings, and fire protection needs,
etc.
8) The applicant/developer shall be aware that prior to any ground disturbing activities on the
site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and
permits are required.
9) The applicant shall be aware that Site Plan approval does not represent a Building Permit and
associated construction activity permits. A separate application process is required for
issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 58
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 2, 2016
APPLICATION: Duplexes at W. Reed Street and South Kirkwood
Street
FILE #: C-16-03
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 59
Duplexes at W. Reed Street and South Kirkwood Street
File #: C-16-03
March 2, 2016
Page 2 of 4
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
c. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7025 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Water service lines shall be shown for each residential lot meeting the following requirements: The water services
shall be one-inch (1”) diameter Type K copper tubing, and installed five feet (5’) to the right of the sewer lateral as
viewed from the center line of the street. Curb stops shall be installed one foot (1’) outside of the right-of-way for each
lot. A water meter and meter pit must be installed on the domestic water service, in a non-traffic bearing location just
downstream of the curb stop.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
4. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures.
5. Sanitary sewer laterals shall be shown for each residential lot meeting the following requirements: The sewer laterals
shall be six-inch (6”) diameter schedule 35 PVC and, where practicable, installed to the center of each lot. Sewer
laterals shall be connected directly to the main, not manholes, unless impracticable. Sewer laterals are to be installed
one foot (1’) beyond the right-of-way line at a typical depth of three feet (3’), preferably not exceeding five feet (5’).
Cleanouts shall be installed one foot (1’) outside of the right-of-way for each lot. The City of Dover has a sanitary
sewer main located in Reed Street, the laterals shall connect to this infrastructure.
Page 60
Duplexes at W. Reed Street and South Kirkwood Street
File #: C-16-03
March 2, 2016
Page 3 of 4
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office. If Kent Conservation District does not require an
approved plan, an erosion and sediment control plan shall be submitted to our office for review and approval. This is
required for the City of Dover to maintain compliance with our MS4 permit.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This
standard was administratively revised to meet ADA and FHA compliance with cross slope requirements and to
prevent cars from scrapping at driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five
feet (5’) wide grass strip behind the curb.
2. The curb cuts for the driveway entrances shall strictly adhere to the Department of Public Works driveway detail.
SANITATION
1. Every person occupying a residence or duplex and every owner of an apartment shall provide such premises with a
sufficient number of solid waste containers to provide adequate capacity for the solid waste placed out for collection
without overloading the capacity of the containers.
GROUNDS
1. None.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / GROUNDS / GENERAL
1. None.
STREETS
1. Eliminate the proposed alley way in the rear of the proposed lots. Please provide access to the properties from Reed
Street.
SANITATION
1. The sanitation containers for the residents shall be placed on the north side of Reed Street, since the road is one way.
Page 61
Duplexes at W. Reed Street and South Kirkwood Street
File #: C-16-03
March 2, 2016
Page 4 of 4
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
3. Impact fees may be required for this project.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Prior to plan approval, the sanitary sewer system plans may be required to be submitted to the DNREC, Division of
Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible
for providing all application fees, completed forms and plan sets directly to DNREC.
3. Impact fees may be required for this project.
STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 62
C F
I I
C-16-03 T R
Y E
CITY OF DOVER
O M
DEVELOPMENT ADVISORY COMMITTEE F A
R
APPLICATION REVIEW COMMENTARY
D S
D.A.C. MEETING DATE: March 9 , 2016 th O H
V A
E L
R
APPLICATION: Duplexes at W. Reed Street and South Kirkwood Street
FILE #: C-16-03 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Timothy P. Mullaney Jr., Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is Residential. Primary fire lanes are required to be 24 feet wide and cover the
side of the building that has the primary entrance and exit. Fire lanes can be no closer than 10
feet to the building and no farther than 50 feet from the building. Fire Lanes are not required
on this project.
2. Emergency access to rear building areas compliant with City of Dover Code (Article 5-
Supplementary Regulations, Section 17); all four stories and greater buildings require 24ft fire
lane at the rear. All two to three story apartment structures require an 18ft Secondary Fire Lane
at the rear. All townhouses (3-8 units) with no fire protection require a 16ft alley at the rear. Rear
Emergency Access is not required on this project.
3. The closest edge of fire lanes shall not be located further than 50ft from the exterior wall if one or
two stories in height; 40ft if three or four stories in height; or 30ft if over four stories in height.
4. Building Access shall be no further than 50 feet from a primary entrance. Where buildings are
provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall
be no further than 100 feet from the primary entrance.
5. Speed Reduction devices or any other like device used to reduce vehicle speed are prohibited per
City of Dover Code of Ordinances.
6. Fire Lanes shall have an unobstructed vertical clearance of not less than 13ft 6in.
7. All Fire Lanes shall be marked in accordance with the adopted Delaware State Fire Prevention
Regulations. All fire lane markings shall be in the color of “yellow”.
Page 63
8. Perimeter Access minimum width shall be 15ft measured from the face of the building at grade
with a maximum slope of 10%. Plantings and utility services shall be permitted within the
perimeter access and shall not interfere with emergency services fire ground operations.
9. Address numbers of at least 12 inches in height must be placed on the street side of the building
visible from the street. Label all suites if applicable.
10. Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection per
City of Dover Code of Ordinances.
11. Full building and fire plan review is required.
12. Building cannot be occupied or construction or renovations started until completion of building
and fire plan review.
13. All required means of egress shall have an exit discharge consisting of a non slip surface, and
leading to and terminating at a public way.
14. As building is over 100,000 square feet, building shall meet the requirements of Large Area
Buildings per Delaware State Fire Prevention Regulations 2009.
15. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
16. Sprinklers required in basements over 2500 sq. ft.
17. Fire Department Connection is to be located within 50 feet of main entrance. Access to the Fire
Department Connection must be clear unobstructed access as defined by the AHJ.
18. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
19. Fire Alarm System required per occupancy code requirements.
20. Knox Box required at all tenant spaces. Please contact this office in regards to Knox Box location.
21. Standpipes required.
22. Smoke control required.
23. Elevator cars to meet the interior dimensions set forth in the Delaware State Fire Prevention
Code.
24. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO.
25. Gates are to be operational with Fire Department Opti-Con Systems approved by Delaware
Department of Transportation. All gates are required to have one manual and one automated
means for opening. To be considered accessible for fire department apparatus the actual clear
openings shall be not less than 14ft, the paved surface through the gate shall be not less than 12ft
and the gate shall be setback from the perpendicular street by at least 50ft.
Page 64
26. Project to be completed per approved Site Plan.
27. Multiple Access Roads shall be provided when a fire department access road (fire lane) is
determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain,
climatic conditions, or other factors that could limit access such as placement of fire hose from
fire equipment.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
The use is classified as a “Residential” Use. Per NPFA Life Safety Code the use as a residential
dwelling unit, is classified as a one and two-family dwelling unit as a Duplex; meaning one-family
dwelling unit attached to an adjacent one-family unit.
Per the Accessibility Tables within the Delaware State Fire Prevention Regulations, there is no
requirement for accessibility for the proposed use.
Please confirm or deny whether Fire Protection Systems are provided. Codes do not require Fire
Suppression Systems in one and two family dwelling as defined by Delaware State Fire
Prevention Regulations when the dwelling units are separated by two hour rated construction.
Please confirm if Fire Protection is being provided. If fire protection is provided, this may cause
for further review.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2012 NFPA Life Safety Code (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2012 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 65
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 2, 2016 T
===============================================================
APPLICATION: Duplexes at West Reed Street and South Kirkwood Street
FILE#: C-16-03 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no comments regarding city & state code at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no advisory comments at this time.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 66
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
March 2016
APPLICATION: Duplexes W. Reed St. & S. Kirkwood St.
FILE #: C-16-03
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN
IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source:
2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan
must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of
plan submittal to our office. Construction inspection fees based on developed area and stormwater facility
maintenance inspection fees based on the number of stormwater facilities are due prior to the start of construction.
2. The following notes must appear on the record plan:
The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment
control measure, as it deems necessary.
A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
3. A soils investigation in the proposed stormwater facility area(s) is required to determine impacts of the seasonal high
groundwater level and soils for any Best Management Practice (BMP) design.
4. A SAS (Stormwater Assessment Study) submittal is required for review and approval. An SAS meeting will be
scheduled after the submittal has been approved.
ADVISORY COMMENTS TO THE APPLICANT:
1. A Stormwater management design was not provided in the submittal for review.
2. The Developer should consider alternative methods of compliance such as fee in lieu.
3. Green Technologies (bio retention, bio swales, filter strips etc.) must be implemented to comply with the 2014
Delaware Sediment and Stormwater Regulations.
4. The preferred methods of stormwater management are those practices that maximize the use of the natural features
of a site, promote recharge and minimize the reliance on structural components.
5. It is recommended that the stormwater management areas be incorporated into the overall landscape plan to enhance
water quality and to make the stormwater facility an attractive community amenity.
6. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management
plan has been approved.
Page 67
City of Dover Application No.: C-16-03
Department of Planning & Inspections
New
St
RG-1
C-2A
RG-1
Kirkw
RG-1 ood
t
Wes
St
St
C-3
RG-1
C-3 d St
Ree Site
IO
RG-1
en
Que
C-2A
St
C-2
For
est
St C-2
C-2
ilr
C-3 Ra
oa d
Ave IO
St
rman C-2
a Loock e
Jerus
C-2
ay
lem W
IO
RG-1
Title: Lands of MauTiste Investment Group
Address: 420 W Reed St, 105 & 107 S Kirkwood St Legend
Parcel ID: ED-05-076.12-02-65.00-000
ED-05-076.12-02-64.00-000, ED-05-076.12-02-63.00-000 Dover Parcels
Zoning: RG-1 Zoning
Owner: MauTiste Investment Group
Historic District
Date: 2/25/2016
SWPOZ Tier 3
« 0 100 200 400 Feet
2012 Buildings
Page 68
City of Dover
DATA SHEET FOR UNIFIED COMPREHENSIVE SIGNAGE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF March 9, 2016
PLANNING COMMISSION MEETING OF March 21, 2016
Plan Title: Delaware Technical Community College
US-16-01
Plan Type: Unified Comprehensive Signage Plan
Property Location: West side of North DuPont Highway between West Denneys Road
and Scarborough Road
Property Addresses: 100 Campus Drive
Tax Parcels: ED-05-057.00-01-01.00-000
ED-05-057.01-01-06.00-000
ED-05-057.01-01-07.00-000
ED-05-057.00-01-08.00-000
Owners: State of Delaware
Delaware Technical & Community College
Project Professional: Unknown
Site Area: 112 acres ±
Existing Signs: Five (5) monument signs including one sign with changeable copy
(LED Monochromatic panel)
Proposed Signs: Three (3) banners at approved locations as an amendment to
existing Unified Comprehensive Sign Plan
Zoning Classification: IO (Institutional Office Zone)
Roadway Classifications: N. DuPont Highway – Urban Principal Arterial
West Denneys Road – Urban Local Collector
Scarborough Road – Urban Minor Arterial
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 69
C P
I L
CITY OF DOVER T A
Y N
DEVELOPMENT ADVISORY COMMITTEE N
O I
APPLICATION REVIEW COMMENTARY F N
G
D.A.C. MEETING DATE: March 9, 2016 D
O
V
APPLICATION: Delaware Technical & Community College Comprehensive E
Signage Plan R
FILE #: US-16-01 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Bill Cook, Planner I PHONE #: (302) 736-7196
PLAN SUMMARY:
Review of a Unified Comprehensive Signage Plan application which would amend the
applicant’s existing approved Signage Plan (US-13-02) to permit additional banners totaling 418
S.F., to be placed on three (3) buildings on the Delaware Technical Community College campus.
The property is zoned IO (Institutional and Office Zone). The property is located on the west
side of North DuPont Highway between West Denneys Road and Scarborough Road. The owner
of record is State of Delaware - Delaware Technical & Community College. Addresses: 100
Campus Drive. Tax Parcels: ED-05-057.00-01-01.00-000, ED-05-057.01-01-06.00-000, ED-05-
057.01-01-07.00-000, ED-05-057.01-01-08.00-000.
This plan includes three (3) banners placed on three different buildings on the campus. The
banners commemorate the anniversary of the institution. The applicant desires to place the
banners for the duration of calendar year 2016. Banners are typically permitted under the Zoning
Ordinance Article 5 §4.9.D provisions relating to temporary signs, however the following is
noted:
• Temporary signs have a limit on placement for 90 days in a calendar year.
• Temporary signs have a limit on area (100SF total) and number (2 signs).
• A Temporary Sign Permit (#16-03) was issued for 90 days beginning January 1, 2016
and termination April 13, 2016.
• The City Planner may extend the time period for placement an additional 30 days for
"grand openings" as well as the size, type, and number of signs.
• Therefore the maximum possible number of days that the three (3) banners could be
placed is 120 days.
There are provisions in the Zoning Ordinance that allow amendments to approved Unified
Comprehensive Signage Plans without returning to the Planning Commission for re-approval if
the total sign area for the plan would not increase more than 15%. The banners that the applicant
proposes exceed this limit.
Page 70
US-16-01 Delaware Technical Community College Comprehensive Signage Plan
DAC Report – March 9, 2016
Page 2
Staff determined that the solution that would comply with the ordinance would be to amend
existing Unified Comprehensive Sign Plan US-13-02 to include the banners. Additionally, the
applicant would be able to utilize the approved locations for any other banners in the future, such
as for special events, etc., without having to apply for temporary sign permits.
Previous Application
At its meeting of December 16, 2013, the City of Dover Planning Commission moved to grant
conditional approval of the Unified Comprehensive Signage Plan for the Delaware Technical
Community College Terry Campus (US-13-02). Final Plan approval was granted on January 14,
2015, and a Building Permit for installation of the signs was issued on May 21, 2015 (#15-576).
A summary of the signs approved with application US-13-02 is found on Table 1 appearing later in
this report.
SIGNAGE REGULATIONS
Temporary Signs
This application pertains to the use of vinyl mesh banners. Such banners are generally considered
“temporary signs” by the Zoning Ordinance definition:
Temporary sign: A sign intended to display either commercial or noncommercial
messages of a transitory or temporary nature. Any sign not permanently embedded in
the ground, or not permanently affixed to a building or sign structure that is permanently
embedded in the ground, is considered a temporary sign.
Temporary signs have a limit on placement for 90 days in a calendar year. Temporary signs have
a limit on area (100SF total) and number (2 signs) for a property. The intent of the applicant is to
display the banners to commemorate the anniversary of the college. By including the banners as
part of an approved Unified Comprehensive Sign Plan, the locations and sizes are approved so
that other banners of equal or lesser size may be placed at the approved locations in the future.
Street Classification
The subject site includes frontage on three (3) different types of roads. The standard Sign
Regulations allow for different sign types and sizes for each type of road and as related to the use
of adjacent properties. The Sign Table, with streets and classifications for this project noted, is
included as Appendix A for reference.
Appendix A presents the traditional sign regulations for the property based on its road frontages.
Under the provisions for Comprehensive Signage Plans for unified campuses and complexes
found in Zoning Ordinance, Article 5 §4.8 of the Sign Regulations, an applicant may request the
Planning Commission to grant additional signage and sign area than would be permitted under
the traditional sign regulations.
Unified Comprehensive Signage Plans
The campus consists of seven buildings. The project area meets multiple criteria to qualify for a
Unified Comprehensive Sign Plan because the site has three (3) or more principal structures
under common management on continuous property, and has more than 400 linear feet on a
Urban Principal Arterial roadway (North DuPont Highway) per Article 5 §4.8A of the Zoning
Ordinance.
Page 71
US-16-01 Delaware Technical Community College Comprehensive Signage Plan
DAC Report – March 9, 2016
Page 3
However, in considering a Unified Comprehensive Signage Plan, “the number type and size of
sign proposed may not be excessive and must be in proportion to the scale of the building and the
uses on the site.” For the Unified Comprehensive Signage Plans, there shall be architectural
harmony and unity of signs within a unified campus or complex. Sign type, color scheme, size,
and illumination within the site shall be coordinated and shall be compatible with the architecture
of the center and the surrounding area. All Comprehensive Signage Plans must comply with the
design guidelines found in Zoning Ordinance, Article 5 §4.4. The design requirements focus on
freestanding signs, the material and craftsmanship of signs, wall sign placement, illumination,
and changeable signs.
DESIGN GUIDELINES AND OBJECTIVES FOR COMPREHENSIVE SIGNAGE PLANS
In reviewing the overall sign package, each of the sign locations must be reviewed individually
and as a whole. The Planning Commission must take into consideration the public health, safety
and welfare, the comfort and convenience of the public in general and of the residents, business
and property owners of the immediate neighborhood in particular and shall ensure that the Site
has adequate but not excessive signage.
The Sign Ordinance specifically spells out the guidelines for the Planning Commission to use to
approve or disapprove a Unified Comprehensive Signage Plan (Zoning Ordinance, Article 5 §
4.8 B and C). The pertinent design guidelines and objectives are as follows:
B. Design guidelines for unified comprehensive signage plans.
1. Unified campuses and complexes applying for a unified comprehensive signage plan
may not be held to the height, size, number and area regulations for signs found in other
subsections of this section. However, the number, type and size of signs proposed may
not be excessive, and must be in proportion to the scale of the buildings and the uses on
the site.
2. All unified comprehensive signage plans must comply with all design guidelines found
in subsection 4.4-Design requirements of this section, as well as all specific design
guidelines found in this section.
3. Building signs shall be in harmony with the overall architectural concept for the site,
and be compatible with each other and the building facades.
4. The freestanding signs identifying shopping centers and other unified campuses and
complexes shall identify the name of the campus or complex and no more than three
separate tenants within the campus or complex unless otherwise approved by the
planning commission.
5. There shall be architectural harmony and unity of signs within a unified campus or
complex. Sign type, color scheme, size, and illumination within the site shall be
coordinated and shall be compatible with the architecture of the center and the
surrounding area.
C. Planning commission duties. In reviewing and approving comprehensive signage plans, the
planning commission shall take into consideration the public health, safety and welfare, the
comfort and convenience of the public in general and of the residents, businesses, and property
owners of the immediate neighborhood in particular, and shall ensure that unified campuses and
complexes have adequate, but not excessive, signage. Specifically, the following objectives shall
guide the commission when reviewing such plans:
Page 72
US-16-01 Delaware Technical Community College Comprehensive Signage Plan
DAC Report – March 9, 2016
Page 4
1. That the size and complexity of the campus or complex warrants the need for extra
signage under the provisions of this section;
2. That, in respect to the number and type of entrances, the placement of signage at or
near those entrances provides superior visibility in order to ensure the safety of the
driving public;
3. That the proposed signs are adequate in number to safely direct the public to the use
or uses on the site;
4. The proposed signs must not have an adverse impact on the visibility of adjacent
signs, and shall be consistent with, or an improvement over, the prevailing type and style
of signage in the general area;
5. That the proposed signs will be of a style and color which will complement the
architecture of the site, and the area in general.
SUMMARY OF EXISTING AND PROPOSED SIGNS
Table 1 outlines the existing free standing monument signs on the site as approved in US-13-02,
and the proposed banners pertaining to this application.
Table 1: Existing and Proposed Signage
US-16-01; Delaware Technical and Community College
100 Campus Drive
PROPOSED SIGNS
Sign
Location Description Area
Corner of Building 200 facing southbound U.S. 13 traffic 12' x 14' Mesh banner 168
Above front entrance of Building 400 facing Campus Dr. 50' 5" x 48"' Mesh banner 202
Wall left of front entrance to Building 700 facing West Denneys Rd. 6' x 8' Mesh banner 48
Subtotal 418
EXISTING SIGNS (US-13-02)
Sign
Location Description Area
Monument Sign with large curved brick
NW Corner of North DuPont Highway and Scarborough Road 103.28
wall with piers
Monument Sign of LED Monochromatic
East side of the Scarborough Road entrance Panel (Double-sided) with brick base 47.29
and pier
Monument Sign with curved brick wall
West side of Scarborough Road entrance 64.47
with piers
Monument Sign with brick base and
West Denneys Road entrance 47.29
pier
Monument Sign with curved brick wall
SW Corner of West Denneys Road and North DuPont Highway 64.47
with piers
Subtotal 326.8
SUMMARY
Sign
Description Number of Signs Area
Existing momument/entrance signs (US-13-02) 5 326.8
Proposed Banners 3 418.0
Total, All Signs 8 744.8
Percentage Increase in Sign Area 127.9%
Page 73
US-16-01 Delaware Technical Community College Comprehensive Signage Plan
DAC Report – March 9, 2016
Page 5
The proposed banners as part of this application are all mesh vinyl banners to be attached to the
buildings with cables. The design of the signs, locations on the site, and building faces to which
they are proposed to be attached is included on a page submitted by the applicant. The page
design replicates the approved “Sign Book” for approved US-13-02, and this page would simply
be added as an additional page, if approved. 1
The signs are summarized by building location. While considered “temporary signs” in the
Zoning Ordinance, staff reviewed the signage using the size limits for “wall signage” in order to
evaluate the proposed signage in terms of the design Guidelines for Comprehensive Signage
Plans related to sign area, surrounding context, and determining whether the proposed signage is
“excessive.” Staff made estimates of wall area since wall dimensions were not requested or
provided.
Building 200
This 168 SF banner is located on the corner of the building and faces southbound North DuPont
Highway traffic. The street classification of the property frontage in this location is Urban
Principal Arterial. Temporary signs are limited to two (2) per property, maximum 100 SF in area.
Wall signs would be limited to two (2), maximum 15% of the wall area. The proposed sign
would be approximately 75 feet from the property frontage. Staff notes that by definition in the
code, this sign would exceed the 15% wall area limit if considered under the standard Sign
Regulations for wall signs.
Building 400
This 202 SF banner is located on the entrance of the building facing Campus Drive, a private
street. The wall on which it is placed is perpendicular to the Scarborough Road frontage, which
is classified as Urban Minor Arterial. Temporary signs are limited to two (2) per property,
maximum 100 SF in area. Wall signs would be limited to the lesser of 15% of the wall area or
64SF. The proposed sign would be nearly 400 feet from the property frontage. Staff notes by
definition in the code, this sign would exceed the 64SF limit if considered under the standard
Sign Regulations for wall signs.
Building 700
This 48 SF banner is located on the building corner that faces West Denney’s Road. The street
classification of the property frontage in this location is Local Collector, and by definition the
property is considered “adjacent to residential.” Temporary signs are limited to two (2) per
property, maximum 100 SF in area. Wall signs would be limited to the lesser of 15% of the wall
area or 32SF. The proposed sign would be nearly 400 feet from the property frontage. Staff notes
by definition in the code, this sign would exceed the 32SF limit if considered under the standard
Sign Regulations for wall signs.
1
Approved Sign Book for US-13-02 is available for review at the Planning Office, or a copy in .PDF format can be
emailed upon request. Contact Bill Cook at wcook@dover.de.us for a copy.
Page 74
US-16-01 Delaware Technical Community College Comprehensive Signage Plan
DAC Report – March 9, 2016
Page 6
RECOMMENDATIONS
Staff recommends approval to amend US-13-02 to include three (3) banners in the proposed
locations, and offers the following comments relating to the purpose and design guidelines for
Unified Comprehensive Signage Plans:
• The signage presents a harmonious concept incorporating colors and other design
elements that relate to the college logo and institutional identity.
• The number, type, and size of signs are appropriate and proportional to the building size,
distances from the public roadways, and to the different street classifications as defined in
the Zoning Ordinance.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) No comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) No Comments.
ADVISORY COMMENTS TO THE APPLICANT:
1) Staff requires a final submittal of the Unified Comprehensive Signage Plan, including any
revisions and conditions of Planning Commission approval, to be reviewed administratively
before applications for Sign Permits will be accepted. For this case, reprinting the “Sign
Book” for US-13-02 is not required. If no changes to the proposal are warranted, Staff will
amend the proposed page to the existing .PDF file and return a copy to the applicant
electronically.
2) Staff notes that existing building signs are not included in the Unified Comprehensive
Signage Plan. Contact staff in the event of new construction or proposed changes to building
signage to determine if future amendments are required.
3) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
4) The applicant shall be aware that Unified Comprehensive Signage Plan approval does not
represent a Sign Permit. Any proposed site or building identification sign shall require a Sign
Permit from the City of Dover prior to placement of any such sign.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 75
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 2, 2016
APPLICATION: DELAWARE TECHNICAL COMMUNITY COLLEGE
COMPREHENSIVE SIGN PLAN
FILE #: US-16-01
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric 302-736-7070, Public Works 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Signs should be placed in a manner that meets NESC requirements.
WATER / WASTEWATER / STORMWATER/ STREETS / SANITATION / GROUNDS
1. The City of Dover Department of Public Works has no objection to the proposed sign plan, due to the fact that the
signs are not located within ten feet (10’) of underground utility infrastructure.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT
P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 76
C F
I I
US -16-01 T R
Y E
CITY OF DOVER
O M
DEVELOPMENT ADVISORY COMMITTEE F A
R
APPLICATION REVIEW COMMENTARY
D S
th
D.A.C. MEETING DATE: March 9 , 2016
O H
V A
E L
R
APPLICATION: Delaware Technical Community College Comprehensive Sign Plan
FILE #: US-16-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Timothy P. Mullaney Jr., Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
No objection to Comprehensive Sign Plan.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2012 NFPA Life Safety Code (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2012 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 77
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 2, 2016 T
===============================================================
APPLICATION: Delaware Technical Community College Comprehensive Sign Plan
FILE#: US-16-01 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no advisory comments at this time.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 78
Appendix A: Sign Table
Zoning Ordinance , Article 5 §4.7
SIGN TABLE
Use Road Type Permitted Signs
Specific Sign Type Number Max. Size Max. % of Total Setback Exclusion
Permitted Height Wall Area (R.O.W.) Zone
Single-Family Detached Signs permitted in § 4.5 only
Residential Uses and
All Streets
Semi-Detached
Professional Office Post or 1/entrance 12 S.F. 7 feet N/A 5 feet 20 feet
Nonresidential Uses in
Subdivisions Monument
Wall 1/frontage 16 S.F. N/A < = 15% N/A N/A
All Streets
Multi-Family Residential Uses Wall & 1/frontage 32 S.F. N/A < = 15% N/A N/A
Residential Districts Monument or 2/entrance 32 S.F. 7 feet N/A 5 feet 20 feet
Manufactured Home Parks Post and Panel
Places of Worship Wall & 2/frontage 32 S.F. N/A < = 15% N/A N/A
Monument or 1/entrance 32 S.F. 7 feet N/A 10 feet 20 feet
Daycare Centers Post and Panel
Urban Principal OR
Nonresidential Uses Adjacent to
Arterial
Approved Conditional Uses Post** & 1/frontage 16 S.F. 7 feet N/A 5 feet 5 feet
Educational/ Institutional Pylon* 1/frontage 32 S.F. 30 feet N/A 30 feet 50 feet
Wall & 2/frontage 32 S.F. N/A < = 15% N/A N/A
Monument or 1/entrance 32 S.F. 7 feet N/A 5 feet 20 feet
Urban Minor
Post and Panel
All Other Approved Arterial
OR
Residential Districts or Uses
Nonresidential Uses Post** 1/frontage 16 S.F. 7 feet N/A 5 feet 10 feet
Wall & 2/frontage 32 S.F. N/A < = 15% N/A N/A
West Dennys Rd
Urban Local/ Monument or 1/entrance 32 S.F. 7 feet N/A 5 feet 20 feet
Collector Post and Panel
OR
Post** 1/frontage 16 S.F. 7 feet N/A 5 feet 10 feet
Wall & 2/frontage No max N/A < = 15% N/A N/A
N DuPont Hwy Monument or 1/entrance 100 S.F. 10 feet N/A 10 feet 20 feet
Urban Principal Post and Panel
Arterial &
Pylon OR * 1/frontage 100 S.F. 30 feet N/A 15 feet 50 feet
Nonresidential Uses in
Pylon* 1/frontage 150 S.F. 30 feet N/A 31 feet 50 feet
Scarborough Rd Wall & 2/frontage 64 S.F. N/A < =15% N/A N/A
Monument or 1/entrance 64 S.F. 7 feet N/A 5 feet 20 feet
Urban Minor
Nonresidential Uses Post and Panel
Arterial
OR
Nonresidential Districts
Post** 1/frontage 16 S.F. 7 feet N/A 5 feet 10 feet
Wall & 2/frontage 32 S.F. N/A < = 15% N/A N/A
Urban Local/ Monument or 1/entrance 32 S.F. 7 feet N/A 5 feet 20 feet
Collector Post and Panel
OR
Post** 1/frontage 16 S.F. 7 feet N/A 5 feet 10 feet
* Denotes that an additional wall sign may be permitted/added in lieu of a freestanding pylon sign.
** Post sign would be in lieu of a monument sign or post and panel sign.
Page 79
City of Dover
DATA SHEET FOR UNIFIED COMPREHENSIVE SIGNAGE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF March 9, 2016
PLANNING COMMISSION MEETING OF March 21, 2016
Plan Title: Winner Ford (US-16-02)
Plan Type: Unified Comprehensive Signage Plan
Property Location: Located on the east side of South DuPont Highway just to the
north of Public Safety Boulevard.
Property Addresses: 591 South DuPont Highway
Tax Parcels: ED-05-077.00-01-12.05-000
Owners: 591 DuPont Highway LLC
Project Professional: First State Signs, c/o Dale McAlister
Site Area: 9.94 acres +/-
Existing Signs: Three (3) pylon signs 277 SF total, 14 wall signs 634 SF total,
seven (7) directional signs 53 SF total
Proposed Signs: Four (4) pylon signs 391 SF total, 15 wall signs 686 SF total, five
(5) directional signs 62 SF total .
Zoning Classification: C-4 (Highway Commercial Zone)
Roadway Classification: North DuPont Highway – Urban Principal Arterial
(per Sign Regulations) Public Safety Boulevard – Urban Local Collector
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 80
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 1
C P
I L
CITY OF DOVER T A
Y N
DEVELOPMENT ADVISORY COMMITTEE N
O I
APPLICATION REVIEW COMMENTARY F N
G
D.A.C. MEETING DATE: March 9, 2016 D
O
V
APPLICATION: Winner Ford Comprehensive Signage Plan E
R
FILE #: US-16-02 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Bill Cook, Planner PHONE #: (302) 736-7196
PLAN SUMMARY
Public Hearing and Review of a Unified Comprehensive Signage Plan application which would
supersede the applicant’s existing approved Signage Plan (US-02-01) and permit the
construction and implementation of new signage for multiple buildings of the motor vehicle sales
and service facility. The new signage would consist of a pylon sign, wall signs, and post and
panel directional signs. The subject property is a total of 9.94 acres +/- and is zoned C-4
(Highway Commercial Zone). The property is located on the east side of South DuPont Highway
just to the north of Public Safety Boulevard. The owner of record is 591 DuPont Highway LLC.
Property Address: 591 South DuPont Highway. Tax Parcel: ED-05-077.00-01-12.05-000.
Council District 2. This application will supersede US-02-01 approved by the Planning
Commission on January 22, 2002.
The plan includes the construction and implementation of wall signage for the newly constructed
Winner Ford showroom and the existing service building located behind it. Wall signage for the
separate Hyundai showroom is unchanged. An additional pylon sign is planned, bringing the
total pylon signs on the site to four (4).
Related Actions
Site Development Plan S-14-02 for a new Ford showroom and service facility was approved by the
Planning Commission at its meeting of February 18, 2014 with Final Plan approval by staff on
October 2, 2014. Building permits were issued and construction is nearing completion.
This plan will replace US-02-01 which was approved by the Planning Commission at its meeting of
January 22, 2002. Sign Permits were subsequently issued after the approval of that plan in
accordance with provisions that allow increases in sign area (within limits) for approved Unified
Comprehensive Sign Plans without the requirement to return to the Planning Commission. Sign
Permit #16-262 for two (2) wall signs for the Ford showroom were recently issued and approved
Page 81
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 2
under the standard Sign Regulations. Those two signs are included in this plan and will be added to
the total sign area for the plan.
SIGNAGE REGULATIONS
Street Classification
The subject site has frontage on South DuPont Highway, an Urban Principal Arterial street, as
well as Public Safety Boulevard which is classified as an Urban/Local Collector street.
Table 1 lists the requirements and limits for signs permitted under the Sign Regulations of the
Zoning Ordinance for the subject property’s location.
Table 1: "Sign Table"
Zoning Ordinance, Article 5 §4.7 (excerpt)
Location Use Road Type Perm itted Signs
Num ber Max. % of Total Setback Exclusion
Sign Type Perm itted Max. Size Height Wall Area (R.O.W.) Zone
Wall & 2/frontage No max N/A < = 15% N/A N/A
Monument or 1/entrance 100 S.F. 10 feet N/A 10 feet 20 feet
Urban
Post and Panel
Principal
&
Nonresidential Arterial
Pylon OR * 1/frontage 100 S.F. 30 feet N/A 15 feet 50 feet
Uses in Nonresidential
Pylon* 1/frontage 150 S.F. 30 feet N/A 31 feet 50 feet
Nonresidential Uses
Districts Wall & 2/frontage 32 S.F. N/A < = 15% N/A N/A
Monument or 1/entrance 32 S.F. 7 feet N/A 5 feet 20 feet
Urban Local/
Post and Panel
Collector
OR
Post** 1/frontage 16 S.F. 7 feet N/A 5 feet 10 feet
* Denotes that an additional w all sign may be permitted/added in lieu of a freestanding pylon sign.
Table 1 presents the conventional sign regulations for the property based on its road frontages.
Under the provisions for Comprehensive Signage Plans for unified campuses and complexes
found in Zoning Ordinance, Article 5 §4.8 of the Sign Regulations, an applicant may request that
the Planning Commission grant additional signage and sign area than would be permitted under
the conventional sign regulations.
Unified Comprehensive Signage Plans
The property consists of four (4) buildings. The project area qualifies for the Unified
Comprehensive Sign Plan process because the site will have three (3) or more principal
structures under common management located on a contiguous property, and also has 400 linear
feet or greater of frontage on an Urban Principal Arterial Street, as defined in Article 5 §4.8 and
4.3 of the Zoning Ordinance.
In considering a Unified Comprehensive Signage Plan, “the number type and size of sign
proposed may not be excessive and must be in proportion to the scale of the building and the
uses on the site.” For Unified Comprehensive Signage Plans, there shall be architectural
Page 82
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 3
harmony and unity of signs within a unified campus or complex. Sign type, color scheme, size,
and illumination within the site shall be coordinated and shall be compatible with the architecture
of the complex and the surrounding area. All Comprehensive Signage Plans must comply with
the design guidelines found in Zoning Ordinance, Article 5 §4.4. The design requirements focus
on freestanding signs, the material and craftsmanship of signs, wall sign placement, illumination,
and changeable signs.
DESIGN GUIDELINES AND OBJECTIVES FOR COMPREHENSIVE SIGNAGE PLANS
In reviewing the overall sign package, each of the sign locations must be reviewed individually
and as a whole. The Planning Commission must take into consideration the public health, safety
and welfare, the comfort and convenience of the public in general and of the residents, business
and property owners of the immediate neighborhood in particular and shall ensure that the Site
has adequate, but not excessive signage.
The Sign Ordinance specifically spells out the guidelines for the Planning Commission to use to
approve or disapprove a Unified Comprehensive Signage Plan (Zoning Ordinance, Article 5 §
4.8 B and C). The pertinent design guidelines and objectives are as follows:
B. Design guidelines for unified comprehensive signage plans.
1. Unified campuses and complexes applying for a unified comprehensive signage plan
may not be held to the height, size, number and area regulations for signs found in other
subsections of this section. However, the number, type and size of signs proposed may
not be excessive, and must be in proportion to the scale of the buildings and the uses on
the site.
2. All unified comprehensive signage plans must comply with all design guidelines found
in subsection 4.4-Design requirements of this section, as well as all specific design
guidelines found in this section.
3. Building signs shall be in harmony with the overall architectural concept for the site,
and be compatible with each other and the building facades.
4. The freestanding signs identifying shopping centers and other unified campuses and
complexes shall identify the name of the campus or complex and no more than three
separate tenants within the campus or complex unless otherwise approved by the
planning commission.
5. There shall be architectural harmony and unity of signs within a unified campus or
complex. Sign type, color scheme, size, and illumination within the site shall be
coordinated and shall be compatible with the architecture of the center and the
surrounding area.
C. Planning commission duties. In reviewing and approving comprehensive signage plans, the
planning commission shall take into consideration the public health, safety and welfare, the
comfort and convenience of the public in general and of the residents, businesses, and property
owners of the immediate neighborhood in particular, and shall ensure that unified campuses and
complexes have adequate, but not excessive, signage. Specifically, the following objectives shall
guide the commission when reviewing such plans:
Page 83
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 4
1. That the size and complexity of the campus or complex warrants the need for extra
signage under the provisions of this section;
2. That, in respect to the number and type of entrances, the placement of signage at or
near those entrances provides superior visibility in order to ensure the safety of the
driving public;
3. That the proposed signs are adequate in number to safely direct the public to the use
or uses on the site;
4. The proposed signs must not have an adverse impact on the visibility of adjacent
signs, and shall be consistent with, or an improvement over, the prevailing type and style
of signage in the general area;
5. That the proposed signs will be of a style and color which will complement the
architecture of the site, and the area in general.
SUMMARY OF EXISTING AND PROPOSED SIGNS
The Plan Book submitted outlines the dimension, placement, and design details for each sign.
Building façade elevations are provided to demonstrate the relationship of signage to each
building and the proportion of sign area to wall area. Proposed and existing signage as of the
present begins on Page 11 of the Plan Book.
Table 2 outlines existing and proposed signs for the Winner Ford/Winner Hyundai site.
Pylon Signs
Three (3) pylon signs exist on the site: "Ford", "Ford Pre-Owned", and "Hyundai." The locations
of the pylon signs are found on Page 11 of the Plan Book and on the separate Site Plan sheet.
The applicant is requesting an additional 114 SF pylon sign ("Quick Lane") to be placed in the
southwest corner of the site at setbacks of 25 feet setback from South Dupont Highway and 21
feet from Public Safety Boulevard. This sign would advertise and identify the entry location for
automotive services not specific to any brand.
Details of the proposed "Quick Lane" sign are found on Plan Book pages 11-13. The sign is 20
feet tall and 6' 7" wide. Staff notes that the total area shown in the Plan Book and in Table 2 (114
SF) is the total face dimension of one side of the sign. While the sign is similar in scale and five
(5) feet shorter than the existing Hyundai pylon sign, the total "sign area" for the Quick Lane
sign is greater because there is more content that is calculated as "sign area."
The standard sign regulations of Zoning Ordinance Article 5 §4 regulate the permitted signage
according to its property frontage. The property has frontages on both an Urban Principal
Arterial and an Urban/Local Collector street. One (1) pylon is permitted per frontage for Urban
Principal Arterial. Pylon signs are not a permitted type on Urban/Local Collector streets. When a
sign is planned for the corner of a property with frontage on different classes of streets, the more
stringent standard applies. The existing and proposed signs meet the "exclusion zone" provisions
of the sign regulations that require a minimum distance between freestanding signs.
Page 84
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 5
Table 2: Proposed Signage
US-16-02; Winner Ford
591 South DuPont Highway
FREESTANDING SIGNS
Sign
No. Planbook Page New Description Sign Face Dimensions Height Setback Area
Pylon Signs
11,12 N Ford 8'3.5" x 19'11" 32' 52 165
11,12 N Ford Pre-Owned 5'9" x 10'5" 20' 53 60
11,12 N Hyundai 6' x 8' and 25' 18' 52
11,12,13 Y Quick Lane 17'10" x 6'7" 20' 25' 114
Subtotal: 391
Directional Signs*
D1 11,26 Y Directional D1 30" x 60" 8' 12.5
D2 11,26 Y Directional D2 46" x 38" 8' 12.4
D3 11,26 Y Directional D3 46" x 38" 8' 12.4
D4 11,26 Y Directional D4 46" x 38" 8' 12.4
D5 11,26 N Directional D5 46" x 38" 8' 12.4
Subtotal: 62.1
Total, Freestanding Signs: 9 Total Square Feet, Freestanding Signs: 453.1
BUILDING SIGNS
Sign
No. Planbook Page New Description Sign Face Dimensions Area
Hyundai Showroom
H1 15, 25 N Winner 2' x 8'4" 17
H2 15, 25 N Hyundai Front 7'7" x 13' 100
H3 15, 25 N Hyundai Side 7'7" x 13' 100
H4 15, 25 N Hyundai Front Entry Logo 2' x 3' 6
Subtotal: 223
Ford Showroom
F1 14, 15, 16, 18 Y Ford Oval Logo 9'7" x 4'2" 40
F2 14, 15, 16, 19 Y Ford Tower Logo 8' x 3'6" 28
F3 14, 15, 16, 20 Y Winner Letters 3'3" x 24' 78
F4 14, 15, 17, 21 Y Service Letters 3' x 12' 36
F5 14, 15, 17, 22 Y Quick Lane 5' x 25' 125
F6 14, 15, 17, 23 Y Quick Lane Wall Sign 5' x 3' 15
Subtotal: 322
Service & Body Shop
F7 14, 15, 24 Y Body Shop 2' x 14' 28
F8 14, 15, 24 Y Service 2' x 10' 20
F9 14, 15, 24 Y Parts & Service 3' x 8' 24
F10 14, 15, 24 Y Fast Lube 3' x 8' 24
F11 14, 15, 24 Y Hyundai Service 3' x 15' 45
Subtotal: 141
Total, Wall Signs: 15 Total Square Feet, Building Signs: 686
Total Square Feet, All Signs: 1139.1
* All signs internally illuminated except for directional signs
Page 85
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 6
When analyzed under the provisions of the standard sign regulations, staff notes the following:
• The property is proposed to have a total of four (4) pylon signs, which is greater than
permitted based on frontage which is one (1) pylon sign. However, the number of pylon
signs on the property has been reduced compared to the number approved in the earlier
2002 plan which was six (6).
• Existing "Ford" sign is over the maximum sign area, but has a 21-foot greater setback
than required.
• Proposed "Quick Lane" sign would be over the maximum sign area for signs at the
proposed setback. Staff notes that a taller pylon was formerly located near this corner
("Mitsubishi") but was subsequently removed since the 2002 plan.
Wall Signs
The applicant is requesting a total of 15 wall signs for the Winner Ford property. The Hyundai
showroom has four (4) existing wall signs totaling 223 SF and no changes are proposed.
Ford Showroom & Quick Lane
Six (6) wall signs totaling 322 SF are planned for the new Ford showroom, three (3) on the front
and three (3) on the side. Details of the signs are found on Plan Book pages 14-20. All are
internally illuminated.
The signs on the front façade consist of two Ford logos. Sign F1 is a 40 SF logo located on the
north end of the wall near the roofline. Sign F2 is a 28 SF logo over the entry doors to the
showroom. Sign F3 consists of a channel letter sign identifying the dealer name to be placed on
the south end of the wall near the roofline.
The signs on the side façade relate to the entrance for the “Quick Lane” service area. Sign F4 is a
36 SF channel letter sign identifying the drive-in service bay. Sign F5 is a 125 SF sign over the
entry door. Sign F6 is a 15 SF wall sign adjacent to the entry door.
Service and Body Shop
Five (5) wall signs totaling 141 SF are planned for the service and body shop, which is located
behind the Ford showroom. Signs F7 and F8 are letter signs identifying the service bay. Signs
F9, F10 and F11 are located on the wall to the right of the service bay and identify services
offered and the Hyundai brand logo..
The standard sign regulations of Zoning Ordinance Article 5 §4 regulate the permitted signage
according to its property frontage. The property has frontages on both an Urban Principal
Arterial and an Urban/Local Collector street. When a property has frontages on different classes
of streets, past practice and code interpretation has allowed the establishment to place signage on
any building wall, subject to the sign area and number that the establishment is entitled to. For
multi-tenant properties or properties with multiple buildings, the sign regulations state each
tenant is “permitted to have at least one wall sign” per unit. Past practice has permitted two (2)
wall signs per tenant or building.
Page 86
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 7
When analyzed under the provisions of the standard sign regulations, staff notes the following:
• The Ford showroom has frontages on an Urban Principal Arterial and an Urban/Local
Collector street and would be allowed four wall (4) signs. Two would be limited to 15%
of the wall area, and two would be a maximum of 32 SF. The applicant proposal has six
(6) wall signs.
• The total number and area of wall signs for the entire property has slightly increased
since the 2002 plan, but there have been significant building and site changes since then.
• Wall area dimensions were not provided or requested, but staff estimates the total area of
signage for wall signs to be under 15% of the wall area.
• Visibility of the wall signs for the service and body shop has not been “field checked”,
but the sign regulations do not require sign permits for signs that cannot be seen from
“any public right-of-way or adjacent property.”
Directional Signs
The applicant is requesting a total of five (5) directional signs totaling 62 SF. One is an existing
sign that shall remain. Four (4) directional signs are new, and of those two are double-sided. All
are eight (8) feet in height and just over 12 SF in sign area.
The locations of the directional signs are shown on Plan Book page 11, and dimensions are
shown on page 26.
When analyzed under the provisions of the standard sign regulations, staff notes the following:
• Directional signs less than five (5) square feet in area do not require a permit. As defined
in the ordinance, directional signs are limited in height to four (4) feet.
• The proposed number of directional signs has decreased but the total area has slightly
increased when compared to the 2002 plan.
RECOMMENDATIONS
Staff recommends approval of US-16-02 to include 1,139 SF of total signage as described in the
submitted plan, and offers the following comments relating to the purpose and design guidelines
for Unified Comprehensive Signage Plans.
Pylon Signs
• Staff recommends approval of the additional "Quick Lane" pylon sign. While standard code
would allow for one (1) pylon sign only, the property has significant frontage, and also has
additional frontage on Public Safety Boulevard which does not permit pylon signs.
• The use of pylon signs and the proposed scale is appropriate for the use of the property as an
automobile dealership representing more than one brand, and the number and size are
consistent with other automobile dealers in the area.
Wall Signs
• Staff finds that the proposed sign plan presents a coordinated concept for the property and
provides signage that provides identity to the structures and aids safe wayfinding to the
Page 87
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 8
general public.
• Staff finds the increases in sign area and sign number compared to the standard sign
regulations to be appropriate for the property and its use as well as the building scale and
setbacks from the right-of-way.
• Coincidentally both brands represented on the site have logos and branding in similar shades
of blue.
Directional Signs
• The decrease in the number of directional signs is noted, and the consistent design is a visual
improvement that will also guide wayfinding on the property.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
The following revisions and corrections to the Comprehensive Signage Plan submission
documents are listed:
1) Plan Book, Page 11:
a) Staff confirmed with the applicant that the "Quick Lane" pylon sign location is more
accurately depicted on the included Becker-Morgan site plan sheet.
2) Plan Book, Page 26:
i) Staff confirmed with the applicant the dimensions of D1, included in Table 2 in the
report.
ii) Adjust total sign to 62 SF.
iii) Staff notes that city code related to "sign area" counts one side of double-sided signs
as the sign area.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) The total signage area will be noted in the Final Plan Approval letter upon completion of
corrections to the Final Plan. This total will form the baseline and “originally approved sign
area” per Zoning Ordinance, Article 5 §4.8.E as related to future new or revised signs for the
buildings and signs on the final approved plan.
ADVISORY COMMENTS TO THE APPLICANT:
1) Staff notes that the auto body shop located off Public Safety Boulevard is not included in
Page 88
US-16-02 Winner Ford Comprehensive Signage Plan
Final DAC Report – March 9, 2016
Page 9
this plan and that the building is planned for demolition.
2) The applicant shall be aware that Unified Comprehensive Signage Plan approval does not
represent a Sign Permit. Any proposed freestanding or wall sign shall require a Sign
Permit from the City of Dover prior to placement of any such sign.
3) Staff requires a final submittal and approval of the Unified Comprehensive Signage Plan,
including any revisions and conditions of Planning Commission approval, before Sign
Permits will be issued.
4) Window signage is subject to regulations in Zoning Ordinance, Article 5 §4.9.A and
require separate permits.
5) Applicant is advised to consult Zoning Ordinance, Article 5 §4.6 related to prohibited
signs, which include pennants, streamers, balloons, “flutter flags”, and other types.
6) Applicant is advised to consult Zoning Ordinance, Article 5 §4.9.D in its entirety related
to temporary signs, which include banners, and provisions related to grand openings.
7) In the event that major changes and revisions to the Signage Plan occur in the finalization
of the signage plan contact the Department of Planning and Inspections. Examples
include reorientation of signage, relocation of signs, changes in sign area, etc. These
changes may require resubmittal for review by the Development Advisory Committee,
Planning Commission, or other agencies and commissions making recommendations in
regards to the plan.
8) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
9) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections and permits are required.
10) Signs should be placed in a manner that meets National Electrical Safety Code (NESC)
requirements.
11) Be advised that the City of Dover, Public Works Department does not permit signs to be
installed within ten (10) feet of existing or proposed water lines.
12) Be advised that the City of Dover, Public Works Department does not permit signs to be
installed within ten (10) feet of existing or proposed sanitary sewer lines.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 89
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 2, 2016
APPLICATION: WINNER FORD COMPREHENSIVE SIGN PLAN
FILE #: US-16-02
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric 302-736-7070, Public Works 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Signs should be placed in a manner that meets NESC requirements.
WATER / WASTEWATER / STORMWATER/ STREETS / SANITATION / GROUNDS
1. The City of Dover Department of Public Works has no objection to the proposed sign plan, due to the fact that the
signs are not located within ten feet (10’) of underground utility infrastructure.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT
P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 90
C F
I I
US-16-02 T R
Y E
CITY OF DOVER
O M
DEVELOPMENT ADVISORY COMMITTEE F A
R
APPLICATION REVIEW COMMENTARY
D S
th
D.A.C. MEETING DATE: March 9 , 2016
O H
V A
E L
R
APPLICATION: Winner Ford Comprehensive Sign Plan
FILE #: US-16-02 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Timothy P. Mullaney Jr., Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
No objection to Comprehensive Sign Plan.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2012 NFPA Life Safety Code (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2012 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 91
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 2, 2016 T
===============================================================
APPLICATION: Winner Ford Comprehensive Sign Plan
FILE#: US-16-02 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no advisory comments at this time.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 92
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
March 2016
APPLICATION: Winner Ford
FILE #: US-16-02
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE
FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE
APPLICANT:
Source:
2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. Kent Conservation District has no objection to the signage plan for the above referenced site.
ADVISORY COMMENTS TO THE APPLICANT:
The Following comments are advisory and apply to the development of a detailed site plan for this project.
The proposed disturbance is less than 5000 square feet and is therefore exempt from stormwater
regulations and will not require permitting from the Conservation District.
A detailed Sediment and Stormwater Management Plan must be reviewed and approved if ay anytime the
disturbance exceeds 5000 square feet.
Page 93
City of Dover
DATA SHEET FOR SITE MASTER PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF March 9, 2016
PLANNING COMMISSION MEETING OF March 21, 2016
Plan Title: Grace Presbyterian Church Site Development Master Plan, S-16-06
Plan Type: Site Development Master Plan
Location: West side of McKee Road south of College Road
350 McKee Road
Tax Map #: ED-05-067.14-01-70.01-000 (to be confirmed)
Owner/Applicants: Grace Presbyterian Church, Inc.
Site Area: 9.23 acres +/-
Zoning: IO (Institutional and Office Zone) and COZ-1 (Corridor Overlay
Zone)
Present Use: Place of Worship
Proposed Use: Place of Worship
Building Areas: Existing Church Building 22,450 S.F.
Existing House (to be demolished)
Proposed Church Addition (Phase 2) 4,212 S.F.
Proposed Church Addition (Phase 3) 9,945 S.F.
Proposed Interior Church Addition (Phase 5) 3,200 S.F.
Proposed Church Addition (Phase 6) 3,500 S.F.
TOTAL 43,307 S.F.
Off Street Parking: Required – 217 spaces (Maximum 272 spaces by Code)
Proposed – 245 spaces
Sewer & Water: City of Dover
Waivers Requested: Partial Elimination of Curbing
Elimination of Opaque Barrier - Fence Component
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 94
City of
Dover
CITY OF DOVER
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: March 9, 2016
APPLICATION: Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
FILE #: S-16-06 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Eddie Diaz, Planner I PHONE #: (302) 736-7196
PLAN SUMMARY
This Site Development Master Plan Review is for the Grace Presbyterian Church to permit
construction in six phases consisting of three building additions and a parking lot expansion. The
building additions would total 20,857 S.F. +/-, partially on two floors. The plan also proposes
demolition of a 1,485 S.F. +/- building near the western edge of the site. The total building area
on site after completion of the plan would be 43,307 S.F. +/-. The area of the site consists of 9.23
acres +/-. The property is zoned IO (Institutional and Office Zone) and is subject to the COZ-1
(Corridor Overlay Zone). The property is located on the west side of McKee Road south of
College Road. The owner of record is Grace Presbyterian Church, Inc. Property Address: 350
McKee Road. Tax Parcel: ED-05-067.14-01-70.01-000. Council District #4.
Previous Applications
On November 15, 2010, Application Z-10-08 went before the Planning Commission requesting
rezoning of a portion of the subject property. At the time the portion consisted of two separate
parcels, located at 1016 and 1022 College Road. The Planning Commission recommended
approval of the rezoning from CPO (Commercial and Professional Office Zone) to IO and the
rezoning was subsequently approved by City Council. This rezoning unified the four parcels on
the subject property under a single zoning classification.
On March 22, 2011, the Planning & Inspections Department approved administratively a Parcel
Consolidation Plan merging 1016 College Road, 1022 College Road, and the two parcels at 350
McKee Road. This Consolidation Plan was intended to unite the four parcels on the subject
property into one parcel. However, it does not appear that the Kent County Recorder of Deeds
has recognized the consolidation. This report will interpret the subject property to be one parcel
instead of four, but the applicant must submit documentation indicating the consolidation has
taken place prior to final plan approval of the current Site Development Master Plan.
In early 2014 Grace Presbyterian Church submitted Site Plan application S-14-09 for
administrative review, proposing to construct an accessory pavilion on the subject property. The
Planning & Inspections Department determined that Administrative Site Plan review was not
required for accessory structures and approved the pavilion with a Building Permit on June 5,
Page 95
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 2
2014. No changes to the pavilion are proposed as part of the current Site Development Master
Plan.
On December 16, 2015, case V-15-15 went before the Board of Adjustment requesting a
variance to increase the maximum number of allowable parking spaces on the subject property,
in connection with the current Site Development Master Plan. In granting the variance, the Board
of Adjustment wrote that the variance would allow additional parking spaces in accordance with
each phase of this Plan’s proposed construction, with the final variance at the completion of
Phase 6 to allow a total of 245 parking spaces, or a variance of 51 parking spaces in excess of the
maximum permitted under the Zoning Code. When the Plan went before the Board of
Adjustment, it proposed a final building area on site of 30,833 S.F. and the maximum number of
parking spaces was 194 spaces. Because the current Plan proposes a final building area of 43,307
S.F., which permits a maximum of 272 spaces, the variance is no longer required at the end of
Phase 6. However, the variance is still required until the completion of Phase 3, because the
majority of the parking spaces proposed to be built on site will be built in Phase 1, earlier than
the building additions requiring them.
SITE DEVELOPMENT MASTER PLAN
The plan for this project is submitted for review under the Site Development Master Plan process
(See Zoning Ordinance, Article 10 §2.44 listed below). This process allows for a series of
construction phases to be outlined in a Master Plan for Planning Commission review and
approval. Prior to each Phase of construction a Site Plan specific to that phase is submitted for
Administrative Site Plan review.
Article 10 §2.44 Site development master plans. Conceptual site development master plans shall
be reviewed by the planning commission in accordance with the provisions of subsection 2.43.
Conceptual site development master plans shall depict a site development proposal that reflects
general compliance with the provisions of the zoning ordinance and shall also reflect the following
information on the plan:
(A) Conceptual Master Plan. Conceptual Master Plan shall include the proposed general
layout of building, streets, parking, open space, landscape concepts, and stormwater
management areas.
(1) Detailed site construction plans, details, and specifications are not required as
part of a site development master plan submission.
(2) The plan shall illustrate distinct phase boundaries for each proposed construction
phase and shall depict proposed construction and site improvements planned for
each phase. Bulk quantities and area totals for each construction phase, and for
the total site, shall be tabulated in a data column on the plan.
(3) Each construction phase shall be enumerated in sequential order on the site
development master plan according to the order of construction contemplated by
the plan. Phases shall be implemented in accordance with the approved site
development master plan unless the city planner approves an alternate phasing.
(4) Each construction phase represented on the master plan shall be planned and
designed to function independent of construction and site improvements
contemplated in future construction phases in all respects, including but not
limited to bulk area provisions of the zoning district in which the site is located,
off-street parking requirements, site entrances, emergency access requirements,
site utilities, and stormwater management improvements except where the
requirements and needs of a later phase are met and remain met by a previous
phase of completed construction.
Page 96
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 3
(5) Any special agreements or conditions of approval relative to the overall
development that have been specified by regulatory agencies shall be
documented on the site development master plan.
(B) Phased site plan approval. Individual phased components of the Conceptual Master
Plan are to be reviewed and approved as an Administrative Site Plan. Final site
construction plans, including detailed site grading, paving, utilities, stormwater
management, and tree planting and preservation plans shall be submitted for final
approval by the city planner and/or authorized designee, and to other agencies
having jurisdiction, on a phase by phase basis in accordance with the approved site
development master plan, and all regulations of the City of Dover governing the
approval of site plans as set forth in subsection 2.4 and 2.5.
PROJECT DESCRIPTION
The Site Development Master Plan proposes six (6) project phases for the Grace Presbyterian
Church expansion. The project involves construction of a 4,212 S.F. two story hospitality
addition in Phase 2; a 9,945 S.F. sanctuary addition in Phase 3; and a 3,500 S.F. multi-purpose
room addition in Phase 6. The project also involves construction of parking lot improvements to
replace an existing unmarked gravel lot, new entrance and exit drives, and stormwater
management facilities in Phase 1; demolition of a 1,485 S.F. (house) building near the western
edge of the site in Phase 4; conversion of a two-story interior space to two floors in Phase 5
(adding a further 3,200 S.F of floor area); and additional parking lot improvements in Phase 6.
IO Zoning District
The project’s existing and proposed use as a Place of Worship is a permitted use in the IO
(Institutional and Office) Zone.
COZ-1 Overlay District
The purpose of the Corridor Overlay Zone (Article 3 §27) is to promote superior development
and a high quality built environment along the City of Dover’s urban corridors. Because of this it
sets standards for landscaping and architectural design in excess of those required by underlying
zoning districts, and sets bulk standards which supersede those outlined in the Zoning
Ordinance, Article 4. The existing Grace Presbyterian Church building does not meet several of
the standards of the COZ. However, the proposed additions and site improvements will abate this
nonconformity. Further descriptions of how the project meets the standards of the COZ or must
act to meet the standards of the COZ are included in the sections below.
BUILDING ARCHITECTURE
The applicant has submitted elevation drawings for the northern facade of the building (fronting
on McKee Road) and for the eastern facade of the building, depicting concepts for the building
appearance after the completion of Phase 2 and the completion of Phase 6. The building
elevation fronting on McKee Road, one of the primary corridors in the COZ, is known as the
“corridor elevation” under the Zoning Ordinance, Article 3 §27.69 and is subject to special
requirements. Specifically, corridor elevations are typically required to include several features,
including functioning windows; a primary entrance door; a primary entrance feature; and either
landscaping integrated into the building design concept, architectural or urban design elements
linking adjacent structures, or architectural relief.
Page 97
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 4
The corridor elevation includes several large functioning windows to let light into the sanctuary
space, multi-purpose room, and hospitality addition. It also includes banded horizontal and
vertical features to create strong architectural relief on the façade. Proposed shrubbery in front
appears to coincide in height with the lowest banding course, integrating this landscaping into
the building design concept. Proposed materials on the façade include brick on the lower
portions and stucco above. The majority of the roof is to be covered with architectural
dimensional shingles, although a few portions are to be covered with standing seam metal.
At the completion of Phase 2 the building will have a primary entrance on the corridor elevation.
This entrance is no longer present at the end of Phase 6. The applicant is encouraged to include
in the Phase 6 corridor elevation a primary entrance door and a primary entrance feature, but if
these cannot be successfully integrated into the building design concept the existing legal
nonconforming primary entrance at the rear of the building will stand as a substitute.
A maximum of two stories and 35 feet of height is allowable by the COZ. The elevation
drawings reveal that the existing multi-purpose room has a legal nonconforming height of 42
feet. Forty-two (42) feet is therefore the maximum allowable height for all portions of the church
building; anything higher would increase the building’s nonconformity to the provisions of the
COZ. The corridor elevation includes a decorative roof element of unclear height marking the
building as a church. The applicant must ensure that the top of this element does not exceed 42
feet in height.
Conceptual elevation drawings for the southern and western facades are not required at this time
because these facades are either substantially unchanged from existing conditions or mostly
invisible from the public right-of-way. Final elevation drawings for all facades will be evaluated
by Planning Staff during the Administrative Site Plan review for each individual phase of the
project.
SITE CONSIDERATIONS
Access to the existing church building is currently provided from McKee Road. The alignment
of this entrance drive is proposed to be changed in Phase 1. There is also a separate driveway
from W. State College Road used to access the church-owned house near the western edge of the
property. A second access onto W. State College Road is proposed for the site, providing exit-
only service from the church parking lot. Because the site is located in the COZ, there is a
minimum spacing requirement between curb cuts. For W. State College Road, this minimum
spacing is 150 feet. Due to the shape of the site it is impossible to locate the proposed exit so that
it is adequately spaced from the existing driveway. The existing driveway from W. State College
Road must therefore be removed when the new exit is built.
The COZ also requires a minimum 12 foot buffer between buildings and any new parking lot and
drive areas. Currently, the buffer requirement is not met on the eastern edge of the site where a
new drive aisle and parking is proposed next to the Phase 3 sanctuary addition. Staff notes that
changes made to the drive and parking areas as a result of City requirements may increase the
total amount of proposed impervious surface coverage on site. However, this increase is not
expected to be enough to place the site over the maximum lot coverage allowed by the IO zone.
Page 98
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 5
Non-residential buildings in the COZ along McKee Road are typically required to have a front
yard setback of at least 40 feet and no more than 50 feet. A front yard setback of 186 feet is
proposed. However, because the existing front yard setback is over 280 feet, the proposed
setback is permitted under Article 7 §1.3 of the Zoning Ordinance because it will further abate
the nonconformity of the building to the setback requirements of the ordinance.
PARKING SUMMARY
The minimum off-street parking requirement for a Place of Worship is at least one (1) space per
200 square feet of floor area, but not less than one (1) space for each four (4) seats, where
provided (Article 6 §3.1). The number of seats currently on site and the number to be added in
this project are unknown.
Accounting for the proposed ultimate build out of the site, the minimum number of parking
spaces required based on floor area is 217 parking spaces, and the maximum number of parking
spaces allowable is 272 parking spaces. The proposed Site Plan shows 245 parking spaces
including handicap parking spaces. The following summary table describes the parking proposed
to be constructed in each phase.
Phase Building/ Parking Cumulative Parking Cumulative
Addition Required per Parking Provided by Parking
Size S.F. Requirement Phase Provided
EX 23,935 S.F. 120 spaces 120 spaces 116 spaces + 116 spaces +
unmarked unmarked
gravel areas gravel areas
1 0 S.F. 0 spaces 120 spaces 85 spaces 201 spaces
2 4,212 S.F. 22 spaces 142 spaces 0 spaces 201 spaces
3 9,945 S.F. 50 spaces 191 spaces 0 spaces 201 spaces
4 -1,485 S.F. 0 spaces 184 spaces 0 spaces 201 spaces
5 3,200 S.F. 16 spaces 200 spaces 0 spaces 201 spaces
6 3,500 S.F. 17 spaces 217 spaces 44 spaces 245 spaces
TOTAL 43,307 S.F. 217 spaces 245 spaces
It is the applicant’s intention to construct most of the parking needed for the church expansion in the
first phase, rather than construct it as needed in each phase based on the size of the individual
building additions. As such the cumulative parking provided until the completion of Phase 3 is in
excess of the maximum allowable under the Zoning Ordinance. The applicant has received a
variance from the Board of Adjustment to permit excess parking spaces during the phases of the
Plan.
The applicant proposes to light the expanded parking lot with light poles that are in the existing
parking lot. No new light poles are shown on the plan. The applicant must ensure that the expanded
parking lot is adequately lighted to make it safe for pedestrians at night.
Loading Spaces
Loading spaces are not required for Places of Worship.
Page 99
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 6
Bicycle Parking
The minimum bicycle parking required is one (1) bike space for every twenty (20) regular
vehicle parking spaces. Based on the number of parking spaces, thirteen (13) bicycle parking
spaces are required. The Site Plan has an area set aside for bicycle parking on the south side of
the building, but it is not clear how many spaces are provided in it.
Sidewalks
The site is served by an 8 foot wide multi-use trail along McKee Road and a 5 foot wide sidewalk
along W. State College Road. An existing sidewalk leading from McKee Road to the church
building is proposed to be partially retained and partially relocated so it continues to serve the
building. No sidewalk is proposed to connect to W. State College Road; however, one is proposed
to connect to the parking lot on the neighboring lands of Kays Enterprises, LLC to the northwest of
the site. The church has a standing agreement with the businesses on these properties to use their
parking lots for overflow parking.
Per Article 3 §27.63 (c) of the Zoning Ordinance, the twelve foot wide buffer between the building
and new parking lot and drive areas which is required by the COZ must contain a sidewalk of at
least six feet width but no more than eight feet width. Most of the new sidewalks proposed within
the buffer zone appear to be five feet in width. A sidewalk should also extend the full 135 foot
length of the parking lot addition proposed in Phase 6.
Waiver Request: Partial Elimination of Curbing
Article 6 § 3.6 (b) requires curbing for all parking areas. The Plan locates upright curbing around
the parking islands, a portion of the drop-off area in front of the existing building, along a portion of
the relocated entrance drive from McKee Road, around the rear perimeter of the expanded Phase 1
parking lot, and along the new exit drive onto W. State College Road.
The applicant is requesting a waiver from installing curbing around the remaining perimeter of the
parking lot and drive areas. The waiver is requested to facilitate sheet flow of stormwater across the
parking lot to the site’s stormwater management facilities. These are proposed to include filter strips
to the north and west of the Phase 6 parking lot expansion, a filter strip to the northeast of the
relocated entrance drive, a biofiltration swale running along the western and northern edges of the
site, and a bioretention facility in the eastern corner of the site.
Dumpsters
Based on the site’s institutional use and square footage, the building requires two (2) Dumpsters. A
Dumpster pad and enclosure is proposed to be located on the western edge of the Phase 1 parking
lot near the entrance to the exit drive aisle; this enclosure as depicted only contains one Dumpster. A
second Dumpster pad is not required to be constructed if one Dumpster is adequate to meet the
institution’s needs. However, the Site Plan must reserve a location on site for a second Dumpster
pad if in the future the City determines there is a need for its construction.
The method of trash collection (front load or side load) has not been specified for the one proposed
Dumpster; if this Dumpster requires front load collection it is not clear that there is adequate
maneuvering space for the collection truck. The Dumpster enclosure may need to be reoriented or
relocated.
Page 100
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 7
TREE PLANTING AND LANDSCAPE PLAN
The submitted plan set includes a concept for the Landscaping Plan. The total lot area is 9.23
acres and there are 1.34 acres of existing woodlands on the site. The applicant is proposing to
clear 0.08 acres of woodland in order to accommodate the southern corner of the Phase 1 parking
lot. The proposed tree removal meets the selective clearing requirements of Article 5 §16.5 of the
Zoning Ordinance.
The area of the lot not in the woodland area is 7.97 acres. Based on this non-woodland area, 116
trees are required to meet the tree density requirements of the site. The applicant proposes to
meet this requirement with new tree plantings of London Plane Tree, Fraser Fir, Atlantic White
Cedar, and Green Giant Arborvitae, as well as with existing trees. The trees are proposed to be
distributed around all the non-woodland edges of the site as well as within the parking lot
islands. There are some small discrepancies between the trees presented on the Landscape Plan
and the data column summarizing them; the data column states that twenty four (24) existing
trees together with ninety six (96) new trees will result in one hundred twenty (120) tree
plantings on site. However, the Landscape Plan appears to depict twenty five (25) existing trees
together with ninety two (92) new trees resulting in one hundred seventeen (117) tree plantings
on site. The tree planting requirements are met, but the applicant must confirm which numbers
represent the intentions of the project.
Staff notes that the proposed Common Nine Bark shrubs will not count toward the tree planting
requirement. Staff also notes that trees must be limbed to twelve feet or above at maturity in
order to allow for visual surveillance of the site.
Waiver Request: Elimination of Opaque Barrier – Fence Component
An opaque barrier is required when a non-residential use abuts a residential use (Zoning Ordinance,
Article 5 §7.2). For this project, the southwestern property line abuts a residential use, the R-10
zoned lands of The Liberty Church. An opaque barrier consists of an opaque component at least six
(6) feet in height (a wooden fence, masonry wall or earthen berm) and a landscape component
consisting of either a continuous evergreen planted screen at least six (6) feet in height when
planted, or a hedge that will grow to be at least six feet. The landscape portion of the buffer is
required to be planted on the residential side of the opaque barrier.
The applicant is requesting a waiver from installing a fence on the southwestern property line. This
property line is currently forested, on the subject property side in the southernmost portion and on
The Liberty Church’s side in the northern portion. Along the northern portion, the applicant
proposes to plant additional evergreen screening on the subject property side. The existing forest
can serve as the landscape component of the opaque barrier.
The Liberty Church has sent a letter to the Planning Commission expressing its support of the
waiver request.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
Page 101
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 8
CITY AND STATE CODE REQUIREMENTS:
1) The City of Dover requests that the applicant submit on separate plan sheets drawings
indicating which site and building improvements are to be completed in each phase.
Currently, the boundary between the Phase 2 and Phase 3 improvements is unclear.
2) All comments provided by Planning Staff in this report are predicated on the site
consisting of one parcel of land. The applicant must provide documentation indicating
that the four parcels previously on site have been properly consolidated. Staff notes that
the site consisted of four parcels as recently as the Board of Adjustment meeting of
December 15, 2015. Planning Staff has also been working to address this issue of
consolidation.
3) Remove the existing residential driveway leading to the house proposed to be demolished in
Phase 4 prior to the construction of the exit drive onto W. State College Road.
4) Ensure there is a minimum twelve foot wide buffer between all new parking and drive areas
and the existing building and its additions. All new sidewalks constructed within this buffer
must be a minimum of six feet wide and a maximum of eight feet wide.
5) Add a second Dumpster pad, or reserve a location for its placement. Specify the type of trash
pickup to be used on site (side load or front load) and ensure the dumpster enclosure is
properly designed, located, and oriented to facilitate trash pickup.
6) Ensure that the expanded parking lot is adequately lighted to make it safe for pedestrians at
night.
7) Ensure that no element of the building elevations extends above 42 feet in height. Staff notes
that architectural drawings will be further evaluated with the Administrative Site Plan
submission for each phase. The architecture may be required to come before the Planning
Commission for additional review if the submission for any phase includes significant design
changes to the additions’ exterior finishes in form and materials.
8) Upright curbing shall be provided around all parking and drive areas in accordance with the
Zoning Ordinance unless a waiver is granted by the Planning Commission. A waiver request
was submitted for consideration.
9) The opaque barrier requirement shall be provided in accordance with the Zoning Ordinance
unless a waiver is granted by the Planning Commission. A waiver request was submitted for
consideration.
10) Sheet M1.0: The data on this cover sheet currently present only the footprint of the
existing buildings and additions to be built. Because portions of the building are two
stories or to be built to two stories, the data must also present the floor area of the
existing buildings and additions.
Page 102
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 9
a. Update the “maximum build out” data column so that in the places it currently says
“existing building” or “proposed building,” it instead says “existing building footprint” or
“proposed building footprint.” In addition, add to this data column an item 3 called
“building breakdown,” listing the square footage of the “existing floor area”, (22,450
S.F.) the “proposed floor area” (20,857 S.F.) , and the total of the two (43,307 S.F.), all as
separate lines in the manner of items 1 and 2.
b. Update the “parking rationale” data column so that all the figures are based on floor area
rather than building footprint.
11) Sheet M1.1:
a. Change the zoning listed on lands belonging to the City of Dover to the southeast. The
correct zoning is ROS (Recreational and Open Space Zone) not RG-3 (Group Housing
Zone).
12) Sheet M1.2:
a. See 11(a) above.
b. Include in the “phasing breakdown” data column both the building footprint and the total
floor area of Phase 2. Phase 5 should read “Interior renovations adding 3,200 S.F.”
c. Indicate in the “phasing breakdown” data column the number of parking spaces and total
impervious surface area to be constructed in Phase 1 and Phase 6.
d. Indicate how many bicycle parking spaces are proposed to be constructed in the bicycle
parking area.
13) Landscape Plan:
a. The Plan must be prepared or certified by a landscape design professional.
b. Update the Plant List data column to ensure it accurately reflects the number proposed of
each kind of tree on site. All trees should have a caliper dimension. It appears there is
some discrepancy between the common names and botanical names provided. The data
column should also have separate fields for height at planting and height at maturity.
c. Clarify the number and location of existing trees. The Plan should not include individual
trees outside of the property lines or any trees inside parking spaces.
d. Include information indicating the spacing of new trees from one another and existing
trees.
14) Any Erosion & Sediment Control Plans and the Stormwater Management Plans granted
approval by the Kent Conservation District must reflect the Site Master Plan layout and
design conditionally approved by the Planning Commission and be in compliance with the
Zoning Ordinance and technical review requirements of other agencies.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) Waiver Requests: The following are the Staff Recommendations regarding the waiver
requests:
a. Partial Elimination of Curbing: Staff recommends approval of the request to
eliminate upright curbing requirements around those portions of the parking lot
Page 103
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 10
and drive aisles not proposed to have upright curbing. There is a demonstrated
need to convey stormwater to the site’s proposed stormwater management
facilities, and curbing is proposed to be eliminated in locations where its removal
will enable sheet flow of water to these facilities. Staff recommends as a condition
of approval that the applicant install parking bumpers on all parking spaces not
adjacent to an upright curb.
b. Elimination of Opaque Barrier – Fence Component: Staff recommends approval
of the request to eliminate requirement of a fence component for the opaque
barrier on the southwestern property line of the site. The existing woodland edge
along this property line is an adequate existing barrier. The applicant is proposing
to plant additional evergreen screening along the norther portion of the property
line, which will serve as a barrier if The Liberty Church or its successors ever
clear the woodland on their side of the property line.
2) Staff recommends that any outside HVAC Equipment be designed to minimize the
impact on adjacent property owners, adequately screened from public view and the
overall visible impact. Consideration must also be given to equipment placement in
proximity to loading areas and public facades of the buildings.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the waiver requests as part of any motion to
approve this Site Plan, or as a separate motion if necessary. Note: The recommendations
for these waivers are at the discretion of the Planning Commission. The Commission may
approve or deny waiver requests.
2) In the event that major changes and revisions to any Site Plan occur in the finalization of
the Master Plan, contact the Planning Office. Examples include reorientation of the
complex/buildings, relocation of site components like stormwater management areas, and
increases in floor area count. These changes may require resubmittal for review by the
Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations in regards to the plan.
3) In the event that there are changes to the architecture, building footprints, layout or
square footage of the buildings contact the Planning Office. These changes may require
review by the Planning Commission.
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) Following Planning Commission approval of the Site Development Master Plan, the Plan
must be revised to meet all conditions of approval from the Development Advisory
Committee or as otherwise noted. These revisions are to be depicted as part of the
Administrative Site Plan submissions which are required to progress to construction. The
Page 104
S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
DAC Report of March 9, 2016
Page 11
Site Plan of each construction phase/project area must be submitted for Administrative
Site Plan Review by the Planning Office and other agencies. Zoning Ordinance, Article
10 §2.44 (D) sets forth the construction timing in relation to approvals.
Article 10 §2.44
(D) Expiration of planning commission approval. For projects which are reviewed and
approved by the planning commission as conceptual master plans, approval of the
conceptual master plan shall remain valid for a period not to exceed five years from the
date of planning commission approval, provided that the authorized construction or use
has commenced within two years of approval and is proceeding toward completion. In
addition, the time between the completion of one phase and the initiation of the next
phase shall not exceed a period of two years.
6) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
7) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections
and permits are required.
8) Construction may have an effect on the adjacent property owners and visitors to existing
facilities on the property. Any work requiring the closing or rerouting of residents or
visitors should be coordinated as to offer the least amount of inconvenience.
9) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or
building identification sign may require a Sign Permit from the City of Dover prior to
placement of any such sign in accordance with Zoning Ordinance Article 5 §4.
10) The applicant shall be aware that Site Plan approval does not represent a Building Permit
and associated construction activity permits. A separate application process is required
for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 105
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 2, 2016
APPLICATION: Grace Presbyterian Church Site Development
Master Plan at 350 McKee Road
FILE #: S-16-06
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 106
Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
File #: S-16-06
March 2, 2016
Page 2 of 5
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
c. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7070 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be
submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must be
installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is
required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the
building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap
and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is
recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The
Department of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind
flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must
be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall
be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor
to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls
and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
7. No trees may be planted within ten feet (10’) of water utility infrastructure.
8. No structure shall be installed within ten feet (10’) of water utility infrastructure.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
Page 107
Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
File #: S-16-06
March 2, 2016
Page 3 of 5
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures, including cleanouts.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings)
showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County
ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the
proposed location, must be provided on the plan.
8. Each property shall be served by a single sanitary sewer lateral which shall be furnished and installed by the property
owner. In the event a property contains multiple principle structures, such as shopping centers or apartment
complexes, the property shall be served by a single sanitary sewer main where a sanitary sewer lateral may be
provided to each principle structure. Each structure, which is capable of being offered for sale, shall have its own
separate wastewater facilities. If a technical infeasibility exists, a waiver may be granted from this requirement.
9. Please provide more information on the connection to the City owned sanitary sewer main. Further comments may
be required upon next submission.
10. Calculations shall be provided for the proposed sewer pump for this site. The calculations shall show that velocity and
all other requirements are met.
11. No structure shall be installed within ten feet (10’) of wastewater utility infrastructure.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted
to our office.
SANITATION / GROUNDS
1. None
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
Page 108
Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
File #: S-16-06
March 2, 2016
Page 4 of 5
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / SANITATION / GROUNDS / GENERAL / STREETS
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking
Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan
sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the
Office of Drinking Water until review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
4. Water impact fees may be required for this proposed site plan.
5. The City of Dover will not maintain the water service within the property.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Prior to plan approval, the sanitary sewer system plans may be required to be submitted to the DNREC, Division of
Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible
for providing all application fees, completed forms and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm
sewer crossings must be shown on the profiles.
4. Wastewater impact fees may be required for this proposed site plan.
5. The City of Dover will not maintain the sanitary sewer infrastructure beyond the existing property lines.
STORMWATER / GROUNDS / STREETS
1. None.
SANITATION
1. The City of Dover will continue to provide the current level of trash service to this address. If additional trash service
is required, the owner shall secure a private company to take over the sanitation service. The location and orientation
of the dumpster enclosure shall meet the Department of Public Works requirements.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
Page 109
Grace Presbyterian Church Site Development Master Plan at 350 McKee Road
File #: S-16-06
March 2, 2016
Page 5 of 5
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 110
C F
I I
S-16-06 T R
Y E
CITY OF DOVER
O M
DEVELOPMENT ADVISORY COMMITTEE F A
R
APPLICATION REVIEW COMMENTARY
D S
D.A.C. MEETING DATE: March 9 , 2016 th O H
V A
E L
R
APPLICATION: Grace Presbyterian Church Site Development Master Plan at 350 McKee Rd
FILE #: S-16-06 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Timothy P. Mullaney Jr., Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is use is Assembly. Primary fire lanes are required to be 24 feet wide and cover
the side of the building that has the primary entrance and exit. Fire lanes can be no closer than 10
feet to the building and no farther than 50 feet from the building.
2. Emergency access to rear building areas compliant with City of Dover Code (Article 5-
Supplementary Regulations, Section 17); all four stories and greater buildings require 24ft fire
lane at the rear. All two to three story apartment structures require an 18ft Secondary Fire Lane
at the rear. All townhouses (3-8 units) with no fire protection require a 16ft alley at the rear.
3. The closest edge of fire lanes shall not be located further than 50ft from the exterior wall if one or
two stories in height; 40ft if three or four stories in height; or 30ft if over four stories in height.
4. Building Access shall be no further than 50 feet from a primary entrance. Where buildings are
provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall
be no further than 100 feet from the primary entrance.
5. Speed Reduction devices or any other like device used to reduce vehicle speed are prohibited per
City of Dover Code of Ordinances.
6. Fire Lanes shall have an unobstructed vertical clearance of not less than 13ft 6in.
7. All Fire Lanes shall be marked in accordance with the adopted Delaware State Fire Prevention
Regulations. All fire lane markings shall be in the color of “yellow”.
Page 111
8. Perimeter Access minimum width shall be 15ft measured from the face of the building at grade
with a maximum slope of 10%. Plantings and utility services shall be permitted within the
perimeter access and shall not interfere with emergency services fire ground operations.
9. Address numbers of at least 12 inches in height must be placed on the street side of the building
visible from the street. Label all suites if applicable.
10. Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection per
City of Dover Code of Ordinances.
11. Full building and fire plan review is required.
12. Building cannot be occupied or construction or renovations started until completion of building
and fire plan review.
13. All required means of egress shall have an exit discharge consisting of a non slip surface, and
leading to and terminating at a public way.
14. As building is over 100,000 square feet, building shall meet the requirements of Large Area
Buildings per Delaware State Fire Prevention Regulations 2009.
15. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
16. Sprinklers required in basements over 2500 sq. ft.
17. Fire Department Connection is to be located within 50 feet of main entrance. Access to the Fire
Department Connection must be clear unobstructed access as defined by the AHJ.
18. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
19. Fire Alarm System required per occupancy code requirements.
20. Knox Box required at all tenant spaces. Please contact this office in regards to Knox Box location.
21. Standpipes required.
22. Smoke control required.
23. Elevator cars to meet the interior dimensions set forth in the Delaware State Fire Prevention
Code.
24. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO.
25. Gates are to be operational with Fire Department Opti-Con Systems approved by Delaware
Department of Transportation. All gates are required to have one manual and one automated
means for opening. To be considered accessible for fire department apparatus the actual clear
openings shall be not less than 14ft, the paved surface through the gate shall be not less than 12ft
and the gate shall be setback from the perpendicular street by at least 50ft.
Page 112
26. Project to be completed per approved Site Plan.
27. Multiple Access Roads shall be provided when a fire department access road (fire lane) is
determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain,
climatic conditions, or other factors that could limit access such as placement of fire hose from
fire equipment.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1) Please provide documentation of Building Height for all buildings. The Delaware State Fire
Prevention Regulations Accessibility Table requires certain percentages as it relates to Fire
Lane Coverage which is dictated by building use and building height. Please provide this
information so this office can determine the Fire Lane Coverage needed for the project.
2) Please provide documentation of Building Height for all buildings. The Delaware State Fire
Prevention Regulations Accessibility Table requires certain percentages as it relates to
Perimeter Access Coverage which is dictated by building use and building height. Please
provide this information so this office can determine the Perimeter Access Coverage needed
for the project.
3) Fire Department Connection location will need to be relocated to the Canopy area of Phase
2 as a result of our conversation concerning access issues.
4) All Fire Lanes will need to be clearly marked in compliance with the current Delaware State
Fire Prevention Regulations. Markings shall be shown on the plans.
5) Confirm the Proposed Canopy height. It shall have a clear unobstructed clearance of 13ft 6
inches per the current Delaware State Fire Prevention Regulations. Height shall be clearly
shown on the plans.
6) The 18’ drive isle on the south side of the proposed Phase 3 building will need to provide
more access per our conversation concerning fire department access.
7) The 20’ drive lane to the north of the Existing Building that Phase 6 will attach to needs to
be a fire lane with the width of 24’ to meet the coverage for fire department access to that
side of the building. Turning radius for the most demanding fire apparatus will need to be
shown on the drawings to ensure access is provided.
8) This office will need to discuss the need for fire department access (fire lanes) when
connecting the existing building to Phase 3, as the fire lane access may require Phase 6
parking lot addition to occur in coordination with Phase 1 per our conversation.
9) Please show building exit locations to ensure that the exit discharge are to a non slip
surface, and leading to and terminating at a public way.
10) The closest edge of fire lanes shall not be located further than 50ft from the exterior wall if
one or two stories in height; 40ft if three or four stories in height; or 30ft if over four stories
in height. Measurements must be shown on the plans.
Page 113
11) Building Access shall be no further than 50 feet from a primary entrance. Where buildings
are provided with an automatic sprinkler system installed in accordance with NFPA 13,
access shall be no further than 100 feet from the primary entrance. Measurements must be
show on plans.
12) Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO. Please provide total square footage to determine if a
radio performance test is required.
13) Current Fire Hydrant location and any proposed natural or LP gas bottles, meters, values,
regulators, etc., must have impact protection per City of Dover Code of Ordinances.
At the completion of compliance with the above, a second review of the proposed plan will
be conducted to ensure the corrections have not created any other code related issues. This
office suggestions an additional meeting when the second review takes place.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2012 NFPA Life Safety Code (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2012 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 114
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 2, 2016 T
===============================================================
APPLICATION: Grace Presbyterian Church Site Development Master Plan at 350
McKee Road
FILE#: S-16-06 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city & state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
This project has already been reviewed by DelDOT and has been issued comments on
2/2/2016 (Amended 2/9/2016). Once the comments have been addressed, the project can
be resubmitted to DelDOT for further review. Should the applicant have any questions
regarding the comments issued, please contact Jonathan Moore at 302-760-2145.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no advisory comments at this time.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 115
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
March 2016
APPLICATION: Grace Presbyterian Church
FILE #: S-16-06
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN
IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source:
2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan
must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of
plan submittal to our office. Construction inspection fees based on developed area and stormwater facility
maintenance inspection fees based on the number of stormwater facilities are due prior to the start of construction.
2. The following notes must appear on the record plan:
The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment
control measure, as it deems necessary.
A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
ADVISORY COMMENTS TO THE APPLICANT:
1. The Stormwater management plans are currently under review.
2. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management
plan has been approved.
Page 117
City of Dover Application No.: S-16-06
Department of Planning & Inspections
IO
CPO
Wes
CPO tm
D
st er
in
RG-5
r
Topaz Cir
R-8
C-2A
IO
CPO
RG-2 M
d
cK
R
ee
ge
ol
Rd
le
C
Site IPM
IO
RG-3
est Creek D
F or r
RG-3
R-10 R-7
R-8
ROS
D r
r Qu
Fo
ge
a il H
Old ollo
wD
R-8 r
R-8
R-8 R-8 ROS
Title: Grace Presbyterian Church Legend
Address: 350 McKee Road
Parcel ID: ED-05-067.14-01-69.00-000, ED-05-067.14-01-69.01-000, Zoning
ED-05-067.14-01-70.01-000, ED-05-067.14-01-71.01-000 Dover Parcels
Zoning: IO (Institutional and Office Zone) and
COZ-1 (Corridor Overlay Zone) Kent County Parcels
Owner: Grace Presbyterian Church, Inc. Corridor Overlay Zone
Date: 2/25/2016
2012 Buildings
« 0 175 350 700 Feet
Subject Property
Page 118
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF March 9, 2016
PLANNING COMMISSION MEETING OF March 21, 2016
Plan Title: The Arbors Senior Garden Apartments (S-16-07)
Previous Plans: The Arbors Condominiums (C-10-02)
The Arbors: Planned Neighborhood Design – Senior Housing Option (C-07-05)
College Road Garden Apartments: Planned Neighborhood Design - Senior
Housing Option (C-05-01)
Plan Type: Site Plan
Owner/Equitable Owner: Shree Ganesh LLC
Site Area: 3.77 acres +/-
(Previously 4.32 acres with 0.55 acres dedicated for street
right-of-way)
Present Use: Vacant land
Proposed Use: Garden Apartment Building
Number of Dwelling Units: Total – 48 dwelling units
Density: 12.73 dwelling units per acre (48 DU/ 3.77 acres)
Impervious Areas: Proposed – 54%
Off Street Parking: Required: 108 parking spaces (2.25 per dwelling unit)
Proposed: 108 parking spaces
Sewer & Water: Proposed City of Dover
Zoning Classification: RG-2 (General Residence Zone)
Waivers Requested: Partial elimination of curbing
Reduction of 10 (ten) parking spaces
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 119
City of
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: March 9, 2016
APPLICATION: The Arbors Senior Garden Apartments
FILE #: S-16-07 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: (302) 736-7196
PLAN SUMMARY:
This is Review of a Site Plan application to permit construction of a 48-unit senior garden
apartment complex to be known as The Arbors Senior Garden Apartments. The project consists
of a proposed three-story 55,350 S.F. residential building and associated site improvements,
including construction of an improved public street (Senior Way) on existing right-of-way
connecting College Road and Topaz Circle. The parcel is divided into two discontinuous areas
on either side of the right-of-way and totals 3.77 acres. It is zoned RG-2 (General Residence
Zone).The property is located on the north side of College Road and west of McKee Road. The
owner of record is Shree Ganesh LLC. Address: 1051 College Road. Tax Parcel: ED-05-067.00-
01-35.03-000.
Previous Applications:
This property has been the subject of multiple applications. The most recent application for
development was a Conditional Use Site Development Plan C-10-02 which proposed The Arbors
Condominiums as an apartment building with forty-eight (48) units. It was conditionally
approved by the Planning Commission on August 16, 2010; however, C-10-02 expired on
August 31, 2013 without the plan being finalized and no construction commenced. This parcel
was able to pursue the Conditional Use application for apartments following rezoning of the
property to RG-2. The Planning Commission reviewed a rezoning request (Z-09-05) for the
property at 1051 College Road (Lands of JNK, LLC) from R-8 (One Family Residence Zone) to
RG-2 (General Residence Zone) on March 15, 2010 and City Council approved the rezoning
request on April 12, 2010.
Prior to rezoning, the project was previously reviewed under the provisions of the Planned
Neighborhood Design – Senior Citizen Housing Option in order to construction an apartment
style building. Applications included C-07-05 The Arbors: Planned Neighborhood Design -
Senior Housing Option and C-05-01 College Road Garden Apartments: PND Senior Housing
Option. In both cases, the conditional plan approval granted by the Planning Commission has
expired. Associated with C-07-05, a Record Plan was completed and recorded in June 2009 that
established the street right-of-way for Senior Way and divided the property into two areas.
Page 120
S-16-07 The Arbors Senior Garden Apartments
DAC Report of March 9, 2016
Page 2
CURRENT PROJECT DESCRIPTION
The current project proposes the development of an apartment building to be known as The
Arbors Senior Garden Apartments. The plan is seeking approval as a garden apartment project in
the RG-2 zone to consist of 48 dwelling units in a single apartment building along with the other
site improvements including parking, landscaping, and active recreation.
RG-2 Zoning District
The property is zoned RG-2 (General Residence Zone) and subject to the regulations of Zoning
Ordinance, Article 3 Section 2 and Article 4 Section 4.3. Garden apartments are a permitted use
in the RG-2 and a type of multi-family structures in terms of the bulk standards. The RG-2
Zoning restricts multi-family structures to forty (40) feet in height and 3 stories.
BUILDING ARCHITECTURE
The architectural elevations for the apartment building were submitted showing all four
elevations. The exterior finishes for this three story apartment building consists of stone veneer
as a base on the first floor with horizontal siding above and an asphalt shingle roof. The main
entry to the building is centered on the north elevation and is protected by a hipped roof
supported by paired columns. The gable roof and hipped roof forms are also utilized for the
projections the elevations. These projections include a balcony spaces and window features. The
columns are also part of the support structure of the balcony and balustrade. The building
includes trimwork details to highlight the transitions between floors, the window and door
surrounds, and gable ends. The hipped roof also includes dormer windows in select locations.
The building is three stories. The height of the building is listed at 38 feet 6 inches to the mean
height between the eave and ridge as per the definition of “height” for hipped roofs; this
complies with the maximum height limitation.
SITE CONSIDERATIONS:
Site Circulation and Public Street Network
The Arbors site layout will include the construction of the street known as Senior Way (the
continuation of the Topaz Circle “Stub Street”) as a public street to interconnect with College
Road and to provide access from the street to The Arbors. During the land planning process for
the residential subdivision of Emerald Pointe this ‘stub street’ was planned to provide for access
to this then vacant tract of land and to provide the continuation of the traffic circulation network
in the general area. As part of a previous development application review for this property, in
2009 a Record Plan was recorded. This established the right-of-way for Senior Way as a public
street connecting from Topaz Circle to College Road. A public street will better address safety
and traffic circulation for the residents of this site and adjoining areas. In addition, the street
interconnection will provide a distinct second entrance to both The Arbors and to Emerald Pointe
Subdivision as required with the revised Land Subdivision Regulations pertaining to streets.
Access and Parking:
The access to The Arbors will be from Senior Way. The on-site circulation loops around the
building and includes parking areas on three sides of the building. For apartments, parking is
required at a rate of two (2) spaces per dwelling unit and 0.25 per dwelling unit for visitor spaces.
Page 121
S-16-07 The Arbors Senior Garden Apartments
DAC Report of March 9, 2016
Page 3
If the project includes an office, one parking space per 200 S.F. of office space is required. 108
parking spaces are required by Code for the proposed forty-eight (48) units. The Plan proposes a
total of 108 parking spaces for the apartment complex including six (6) handicapped parking
spaces.
However, ten (10) of the proposed spaces are located either entirely or partially within the
front yard setback of Senior Way. Parking is prohibited in the front yard per the parking
limitations of Zoning Ordinance, Article 6 §5.3 Supplementary parking regulations for
multiple dwellings. A waiver request for parking reduction was submitted in accordance with
the Zoning Ordinance, Article 6 §3.9.
Waiver Requested: Partial Elimination of Curbing
Article 6 §3.6 (b) requires curbing for all parking areas. There is a portion of the parking lot west
of the building where it appears curbing is proposed for elimination to facilitate stormwater
management practices.
Bicycle Parking
The minimum bicycle parking is one (1) bike space for every twenty (20) parking spaces. Based
on the number of parking spaces in the parking lot, a minimum of six (6) bicycle parking spaces
is required. A bicycle rack is proposed near the front entrance sidewalk.
Sidewalks:
Zoning Ordinance, Article 5 §18 requires sidewalks to be installed along the public street frontages
of a property. The site proposed construction of sidewalks along both sides of Senior Way and
along College Road. There are connecting sidewalks leading into the site and also the walking path
system proposed as part of the Active Recreation Plan. As part of the previous Minor Subdivision
Plan to create this lot, the requirement for sidewalk along the College Road frontage of the
adjoining parcel to the east was required. This sidewalk is necessary to provide access to the
local shopping, retail establishments, and other services.
Dumpster
The Dumpster location is shown on the northeast corner of the parking area and drive aisle.
Based on the rate established for apartments in Article 5 §6, a total of two Dumpsters are
required. Two 12’ x 12’ pads are provided as required by the Zoning Ordinance. Masonry
construction is proposed as the construction material for the enclosure. Stone or stucco finish
material to match the finished apartment building is the finishing material for the enclosure.
Lighting
Lighting is provided on the plan through a series of light poles in the perimeter of the parking lots.
There is also pathway lighting along the walking path system.
Emergency Rear Access Requirement for Apartment Buildings
The Zoning Ordinance requires an eighteen (18) foot secondary fire lane to provide emergency
access to the rear of the three story apartment buildings (Article 5 §17.5(a)). This project provides
a twenty-four (24) foot fire lane to encircle the building.
Page 122
S-16-07 The Arbors Senior Garden Apartments
DAC Report of March 9, 2016
Page 4
RECREATION/OPEN SPACE:
As part of the Plan review process, the applicant prepared a Recreation Plan to illustrate how The
Arbors development will provide recreation amenities. The Active Recreation Plan illustrates the
recreation amenities to comply with the design specifications described in Article 5 §10 of the
Zoning Ordinance. See Active Recreation Area Plan Report.
Due to the property size and unit density, this project qualifies for active recreation area
exemption for small developments under Zoning Ordinance, Article 5 §10.514. The Active
Recreation Area for this project is required at a rate of 150 square feet per dwelling unit or
10,000 SF whichever is greater. Based on a total of 48 dwelling units, 10,000 SF of active
recreation area is required. The Plan indicates that 0.55 acres (21,780 S.F.) of land would be
reserved as Active Recreation Area.
The Active Recreation Areas are located in two distinct areas within the site. The five (5) foot
wide walking path constructed of stone begins from the northeast corner of the parking lot and
turns west to link to the sidewalk along Senior Way. After crossing Senior Way, the walking path
continues west before turning south to link to the sidewalk at the intersection of Senior Way and
College Road. Along the path are benches and pathway lighting. The proposed amenities include
a gazebo with lawn area in the western recreation area. These open space areas include tree
plantings.
At their meeting of March 15, 2016 the Parks, Recreation and Community Enhancement
Committee will consider the Active Recreation Plan for The Arbors project (part of S-16-07).
The Planning Commission must act upon the Active Recreation Plan as part of any motion
regarding this project, or as a separate motion if necessary.
TREE PLANTING AND LANDSCAPE PLAN
The submitted plan sheets include a Landscape Plan. Based on a lot area of 3.77 acres, a total of
fifty-five (55) trees are required to meeting the tree density requirements. A total sixty-three (63)
tree plantings are shown on the plan. Adjacent to College Road are a series of Forest Pansy
Eastern Redbud trees and Tuscarora Crape Myrtle trees within planting beds. Sweetgum trees
line the parking areas. On the property line adjacent to Emerald Pointe and along the western
property line are groupings of Red Cedar trees with shrub plantings. The street trees along Senior
Way are proposed as London Plane trees.
The Landscape Plan must take into account the location of all proposed utility lines and other site
elements to avoid conflicts.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) All parking areas are required to be curbed. The southwest side of the parking lot shows a
lack of curbing for the purpose of stormwater management. This must be revised unless a
Page 123
S-16-07 The Arbors Senior Garden Apartments
DAC Report of March 9, 2016
Page 5
waiver is granted by Planning Commission for the elimination of curbing for this purpose.
2) Ten (10) of the proposed spaces are located either entirely or partially within the front
yard setback of Senior Way. Parking is prohibited in the front yard per the parking
limitations of Zoning Ordinance, Article 6 §5.3 Supplementary parking regulations for
multiple dwellings. A waiver request was submitted to allow for a reduction in the number
of parking spaces in accordance with the Zoning Ordinance, Article 6 §3.9. If the parking
reduction waiver is not approved by the Planning Commission, the parking must be relocated.
3) The Active Recreation Area Plan is required to be reviewed and a recommendation by the
Parks, Recreation, and Community Enhancement Committee provided prior to review of this
Site Plan by the Planning Commission. The Recreation Plan will be reviewed at their March
15, 2016 meeting and the recommendations will be forwarded to the Planning Commission at
that time.
4) This project is being constructed as the dwelling type of apartments. Please clarify the
intention of the ownership as a number of the plan labels and notes refer to condominiums.
Revise as necessary.
a) Sheet 2, General Note #18 references a limitation for the head of household age as 55
or over. This application was not reviewed as a Planned Neighborhood Design-
Senior Citizen Housing project where such requirement is part of the criteria for
approval. If the property owner seeks this limitation would need to be established by a
deed restriction.
5) Sheet 2 of 9, Site Plan:
a) When listing the acreage, list each area of the parcel and the overall total.
b) Revise Active Recreation area calculations.
c) Show all crosswalk locations.
d) Clarify the traffic controls measures being proposed on Senior Way at the property
entrance.
6) Sheet 5 of 9, Landscape Sheet:
a) Ensure that proposed Landscape plantings (upon planting and at maturity) do not
conflict with the utility lines, fire lanes, etc.
b) The location of the required bicycle parking rack near the building entry sidewalk
(shown on other sheets) conflicts with the proposed tree planting.
c) Ensure Harbor Dwarf Heavenly Bamboo species complies with Dover Code of
Ordinance, Chapter 114, Article III. Bamboo.
7) Recreation Area Plan: Complete updates to the plan set as identified in the Summary Report
of the Active Recreation Area Plan component (Report for 3/15/2016 PRCE Meeting) and as
per recommendations of the Planning Commission.
8) The Site Plan set will need to be updated to reflect any changes recommended or approval for
waivers granted by the Planning Commission.
Page 124
S-16-07 The Arbors Senior Garden Apartments
DAC Report of March 9, 2016
Page 6
9) The Architectural elevations must continue to demonstrate that the building does not exceed
the forty (40) foot height restriction of the RG-2 zone.
10) Add details for construction of sidewalks, barrier free access ramps, piano key styled cross-
walk markings, other pavement markings, etc. to the Detail Sheet.
a) Consider the addition of gates on the Dumpster enclosure better screening and
containment of materials.
11) A Record Plan sheet may be required to record any additional easements or right-of-way
dedications for this project.
12) Any Sediment & Stormwater Management Plans granted approval by the Kent Conservation
District must reflect the Site Plan layout and design conditionally approved by the Planning
Commission and be in compliance with the Zoning Ordinance and technical review
requirements of other agencies.
13) Staff notes that architecture for the building will be evaluated at time of Building Permit
application for compliance with architecture as approved by the Planning Commission. The
building architecture may be required to come before the Planning Commission for additional
review if significant design changes to the buildings’ exterior finishes in form and materials.
14) Any proposed signage is subject to the Sign Regulations of the Zoning Ordinance.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) Recommendations on Waiver Requests: The Staff recommendations regarding the waiver
request is as follows:
a. Partial Elimination of Curbing: Staff recommends approval of the partial
elimination of curbing in designated areas of the proposed parking lot as it will
facilitate the management of stormwater. The Plan should indicate the installation
of parking bumpers at the head of parking spaces lacking upright curb to prohibit
vehicle travel onto non-paved areas.
b. Reduction of Parking Spaces: Staff recommends approval the reduction of ten
(10) parking spaces. The plan must show area reserved to construct parking in the
future if the need arises.
2) Staff recommends approval of the proposed Active Recreation Are Plan concept for a
walking path system with resting areas of benches and the gazebo. Staff recommends the
following conditions of approval regarding the Active Recreation Area plan:
a. The walking path shall be constructed of concrete. This is a better walking surface
than a stone chip path. The concrete surface has a greater durability and ease of
long-term maintenance.
b. The approaches to the gazebo should be made handicapped accessible through site
grading measures, construction framing, etc.
c. Evaluate the appropriate type of traffic control measures (pedestrian crossing
signage, marked crosswalk, stop conditions, etc.) to assist in providing a location
Page 125
S-16-07 The Arbors Senior Garden Apartments
DAC Report of March 9, 2016
Page 7
for pedestrian crossing of Senior Way to access the western recreation area.
Contact the Public Works Office as Senior Way is to become a City street.
3) Staff recommends that any outside HVAC Equipment be designed to minimize the
impact on adjacent property owners, adequately screened from public view and the
overall visible impact on the streetscape.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers are
at the discretion of the Planning Commission. The Commission may approve or deny waiver
requests.
2) In the event, that major changes and revisions to the Site Plan occur in the finalization of the
plan contact the Department of Planning and Inspections. Examples include reorientation of
building, relocation of site components like stormwater management areas, and increases in
floor area. These changes may require resubmittal for review by the Development Advisory
Committee, Planning Commission, or other agencies and commissions making
recommendations in regards to the plan.
3) Following Planning Commission approval of the Site Plan, the Plan must be revised to meet
all conditions of approval from the Development Advisory Committee or as otherwise noted.
A Check Print must be submitted for review by Planning Office Staff. Upon determination
that the Plan is complete and all agency approvals have been received, copies of the Plan may
be submitted for final endorsement.
4) The professional engineer and landscape architect signing/sealing the plan are required to
have a City of Dover Business License. Contact the Permit & Licensing Section at (302)-736-
7010 regarding the licensing procedures.
5) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
6) For new construction, the requirements of the building code and the fire code must be
complied with. Consult with the Chief Building Inspector and City of Dover Fire Marshal for
these requirements. The resolution of these items may impact the site design including such
items as building dimensions and height, building openings, and fire protection needs, etc.
7) The applicant/developer shall be aware that prior to any ground disturbing activities on the
site the appropriate site inspections and permits are required.
8) Construction activities will have an effect on the adjacent property owners and to travel lanes
and/or shoulder area of the adjacent roadway. Any work requiring the closing or rerouting of
potential residents or visitors to adjacent properties should be coordinated as to offer the least
amount of inconvenience to the adjacent property owners and the roadway.
Page 126
S-16-07 The Arbors Senior Garden Apartments
DAC Report of March 9, 2016
Page 8
9) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or building
identification sign shall require a Sign Permit from the City of Dover prior to placement of
any such sign.
10) The applicant shall be aware that Site Plan approval does not represent a Building Permit and
associated construction activity permits. A separate application process is required for
issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the above contact
person at the Department of Planning & Inspections.
Page 127
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 2, 2016
APPLICATION: The Arbors Senior Garden Apartments at 1051
College Road
FILE #: S-16-07
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 128
The Arbors Senior Garden Apartments at 1051 College Road
File #: S-16-07
March 2, 2016
Page 2 of 4
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
c. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7070 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be
submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must be
installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is
required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the
building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap
and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is
recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The
Department of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind
flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must
be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall
be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor
to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls
and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
7. No trees may be planted within ten feet (10’) of water utility infrastructure.
8. No structure shall be installed within ten feet (10’) of water utility infrastructure.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
Page 129
The Arbors Senior Garden Apartments at 1051 College Road
File #: S-16-07
March 2, 2016
Page 3 of 4
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures, including cleanouts.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings)
showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County
ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the
proposed location, must be provided on the plan.
8. No structure shall be installed within ten feet (10’) of wastewater utility infrastructure.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted
to our office.
2. Per the Delaware Manual on Uniform Traffic Control Devices (MUTCD) the three way stop proposed on Senior Way is
acceptable if the ability to see conflicting traffic on an approach is not sufficient to allow a road user to stop or yield in
compliance with the normal right-of-way rule if such stopping or yielding is necessary. Please provide sight distance
triangles that will prove the need for this intersection.
SANITATION / GROUNDS
1. None
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / SANITATION / GROUNDS / GENERAL / STREETS
1. None.
Page 130
The Arbors Senior Garden Apartments at 1051 College Road
File #: S-16-07
March 2, 2016
Page 4 of 4
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking
Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan
sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the
Office of Drinking Water until review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
4. Water impact fees will be required for this proposed site plan.
5. The City of Dover will not maintain the water service within the property.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed development.
2. Prior to plan approval, the sanitary sewer system plans may be required to be submitted to the DNREC, Division of
Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible
for providing all application fees, completed forms and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm
sewer crossings must be shown on the profiles.
4. Wastewater impact fees will be required for this proposed site plan.
5. The City of Dover will not maintain the sanitary sewer infrastructure beyond the existing property lines.
STORMWATER / GROUNDS
1. None
STREETS
1. The plan was previously approved with a roadway extension of Topaz Circle with connection to College Road. The
right-of-way for this road was also recorded.
SANITATION
1. The City of Dover will continue to provide the current level of trash service to this address. If additional trash service
is required, the owner shall secure a private company to take over the sanitation service. The location and orientation
of the dumpster enclosure shall meet the Department of Public Works requirements.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 131
C F
I I
S-16-07 T R
Y E
CITY OF DOVER
O M
DEVELOPMENT ADVISORY COMMITTEE F A
R
APPLICATION REVIEW COMMENTARY
D S
D.A.C. MEETING DATE: March 9 , 2016 th O H
V A
E L
R
APPLICATION: The Arbors Senior Garden Apartments at 1051 College Road
FILE #: S-16-07 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Timothy P. Mullaney Jr., Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is Apartment/Residential. Primary fire lanes are required to be 24 feet wide
and cover the side of the building that has the primary entrance and exit. Fire lanes can be no
closer than 10 feet to the building and no farther than 50 feet from the building. Fire Lanes shall
cover 35% of the structure as required by code.
2. Emergency access to rear building areas compliant with City of Dover Code (Article 5-
Supplementary Regulations, Section 17); all four stories and greater buildings require 24ft fire
lane at the rear. All two to three story apartment structures require an 18ft Secondary Fire Lane
at the rear. All townhouses (3-8 units) with no fire protection require a 16ft alley at the rear.
3. The closest edge of fire lanes shall not be located further than 50ft from the exterior wall if one or
two stories in height; 40ft if three or four stories in height; or 30ft if over four stories in height.
4. Building Access shall be no further than 50 feet from a primary entrance. Where buildings are
provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall
be no further than 100 feet from the primary entrance.
5. Speed Reduction devices or any other like device used to reduce vehicle speed are prohibited per
City of Dover Code of Ordinances.
6. Fire Lanes shall have an unobstructed vertical clearance of not less than 13ft 6in.
7. All Fire Lanes shall be marked in accordance with the adopted Delaware State Fire Prevention
Regulations. All fire lane markings shall be in the color of “yellow”.
Page 132
8. Perimeter Access shall cover 75% of the building. Perimeter Access minimum width shall be 15ft
measured from the face of the building at grade with a maximum slope of 10%. Plantings and
utility services shall be permitted within the perimeter access and shall not interfere with
emergency services fire ground operations.
9. Address numbers of at least 12 inches in height must be placed on the street side of the building
visible from the street. Label all suites if applicable.
10. Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection per
City of Dover Code of Ordinances.
11. Full building and fire plan review is required.
12. Building cannot be occupied or construction or renovations started until completion of building
and fire plan review.
13. All required means of egress shall have an exit discharge consisting of a non slip surface, and
leading to and terminating at a public way.
14. As building is over 100,000 square feet, building shall meet the requirements of Large Area
Buildings per Delaware State Fire Prevention Regulations 2009.
15. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
16. Sprinklers required in basements over 2500 sq. ft.
17. Fire Department Connection is to be located within 50 feet of main entrance. Access to the Fire
Department Connection must be clear unobstructed access as defined by the AHJ.
18. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
19. Fire Alarm System required per occupancy code requirements.
20. Knox Box required at all tenant spaces. Please contact this office in regards to Knox Box location.
21. Standpipes required.
22. Smoke control required.
23. Elevator cars to meet the interior dimensions set forth in the Delaware State Fire Prevention
Code.
24. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO.
25. Gates are to be operational with Fire Department Opti-Con Systems approved by Delaware
Department of Transportation. All gates are required to have one manual and one automated
means for opening. To be considered accessible for fire department apparatus the actual clear
openings shall be not less than 14ft, the paved surface through the gate shall be not less than 12ft
and the gate shall be setback from the perpendicular street by at least 50ft.
Page 133
26. Project to be completed per approved Site Plan.
27. Multiple Access Roads shall be provided when a fire department access road (fire lane) is
determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain,
climatic conditions, or other factors that could limit access such as placement of fire hose from
fire equipment.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Fire Lanes shall cover 35% of the building. Fire Lanes signage and markings shall comply with
Delaware State Fire Prevention Regulations as state don plans. The current design is not
showing compliance with State Regulations; missing demarcation lines.
2. Perimeter Access shall cover 75% of the building. Fire Lanes can be utilized to meet this
requirement per State Fire Prevention Regulations.
3. Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection per
City of Dover Code of Ordinances. Please provide locations of service connections.
4. No plantings shall interfere with fire lane; fire lanes require a minimum 24ft clearance to include
a minimum 13ft 6 in clearance. Current landscape plan shows landscape encroaching into the fire
lane.
5. Knox box will be required at FDC location.
6. Any changes to the entrance off of College Road or to the Apartment Complex will result in
further review to ensure there is adequate fire department access (turning radius).
7. All plantings around the Fire Department Connection location need to allow for clear
unobstructed access.
8. Fire Department Connection; the current proposed location is very close to being non complaint
due to the distance requirement to the fire lane (100ft). Any adjustments to the location of the
Fire Department Connection need to be reviewed by this office and the Dover Fire Department.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2012 NFPA Life Safety Code (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2012 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 134
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 2, 2016 T
===============================================================
APPLICATION: The Arbors Senior Garden Apartments at 1051 College Road
FILE#: S-16-07 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
Per Section 3.2.5 of the DelDOT Development Coordination Manual March 2015, an 80-
foot wide right-of-way (40-feet from the centerline) is required for a minor arterial.
According to the Kent County Classification Maps, KCR 099 (College Road) is classified
as a minor arterial road. If the existing right-of-way does not have the proper width along
the frontage of the site, the department will require 40-feet of right-of-way dedication
from the innermost edge of the through lane for public use.
Per section 3.2.5.1.2 of the DelDOT Development Coordination Manual Adopted March
2015 the applicant must provide a 15’ permanent easement along the properties frontage
for a future infrastructure needs
The applicant must provide a multi-use path/ ADA compliant sidewalk and ADA
compliant curb ramps across the frontage of the property.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
This project has been received by DelDOT and has been accepted into formal review on
2/22/2016. DelDOT will complete a thorough review of the project and will provide the
applicant with a list of comments which should be addressed. Should the applicant have
any questions regarding the review process or the comments issued, please contact
Jonathan Moore at 302-760-2145.
Page 135
ADVISORY COMMENTS TO THE APPLICANT:
For reference, all entrances must be designed in accordance to DelDOT’s rules and
regulations. Please reference the DelDOT Development Coordination Manual Adopted
March 2015 or contact the reviewer listed above.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 136
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
March 2016
APPLICATION: The Arbors Senior Garden Apartments
FILE #: S-16-07
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN
IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source:
2014 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan
must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of
plan submittal to our office. Construction inspection fees based on developed area and stormwater facility
maintenance inspection fees based on the number of stormwater facilities are due prior to the start of construction.
2. The following notes must appear on the record plan:
The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment
control measure, as it deems necessary.
A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
ADVISORY COMMENTS TO THE APPLICANT:
1. The Stormwater management plans were re-approved on November 10, 2015 and are valid till April 28, 2018.
Page 137
PETITION TO AMEND ZONING ORDINANCE TEXT
Report to the
Dover Planning Commission
March 21, 2016
Proposed Change: Amendment to Zoning Ordinance, Article 3 –District Regulations,
Section 1 – One-family residence zones, Subsection 1.1 – Uses
permitted, Subsection 1.15 – Accessory uses to regulate the
keeping of chickens within the one-family residence zones.
Summary of Amendment: The proposed amendment would eliminate the language that
allows the keeping of not more than 25 fowl within the one-family
residence zones and add a subsection to allow for the keeping of
chickens for domestic purposes, subject to certain requirements.
At the first reading before City Council a question came up about
whether the code prohibits the keeping of roosters. After reviewing
the Animal Control section of the code, it was determined that
roosters are not prohibited. Therefore, staff proposes that a new the
following be added between lines 38 and 39:
vii. Keeping of roosters shall be prohibited.
Ordinance Number: Staff Substitute #1 for Proposed Ordinance #2016-01
File Number: MI-16-02
Page 138
FIRST READING
CITY OF DOVER
STAFF SUBSTITUTE #1 FOR
PROPOSED ORDINANCE #2016-01
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Appendix B - Zoning, Article 3 - District Regulations, Section 1 - One-family residence zones
4 [(R-20, R-15, R-10, R-8 and R-7)], Subsection 1.1 - Uses permitted, Subsection 1.15 - Accessory
5 uses, limited to the following of the Dover Code be amended by deleting the text indicated in red
6 strikeout and inserting the bold, blue text, as follows:
7 1.15 Accessory uses, limited to the following:
8 (a) Professional office or studio of an artist, dentist, musician, teacher, or physician, but
9 not including veterinarians, provided that:
10 i. Such office or studio is incidental to the residential use of the premises and is
11 carried on by a resident thereon with not more than one nonresident assistant; and
12 ii. Such office or studio shall occupy not more than 30 percent of the area of one
13 floor of the main building.
14 iii. Studios where dancing or music instruction is offered to groups in excess of four
15 pupils at one time or where concerts or recitals are held are prohibited.
16 iv. Medical centers, barbershops, beauty parlors, real estate offices, funeral homes
17 or similar uses shall not be considered permitted accessory uses.
18 (b) Garden house, tool house, playhouse, greenhouse or pool incidental to the residential
19 use of the premises and not operated for gain.
20 (c) Private garage, provided that, in the case of a one-family dwelling, such garage shall
21 have a capacity of not more than three passenger automobiles. One such space may be
22 leased to a person not [a] resident on the premises.
23 (d) Keeping domestic animals (except pigs) for individual domestic purposes or as pets,
24 provided not more than three (3) dogs over six months old, and not more than 25
25 fowl shall be permitted, and no animals (except dogs) or fowl shall be penned or
26 housed within 20 feet of any lot line.
27 (e) (Reserved.) Keeping of chickens for individual domestic purposes subject to the
28 following restrictions:
29 i. Keeping of chickens shall not be permitted on lots smaller than 10,890
30 square feet in lot area.
31 ii. No more than five (5) chickens shall be permitted on a residential lot.
Page 139
Staff Substitute #1 for Proposed Ordinance #2016-01 - Appendix B, Article 3, Section 1 Page 2
32 iii. Chickens shall be registered with the Delaware Department of Agriculture.
33 iv. Chickens shall be penned in a coop that shall be at least four (4) square feet
34 per chicken.
35 v. All chicken coops shall be located in a rear yard and shall be a minimum of
36 20 feet from side and rear property lines.
37 vi. Any odor associated with the chickens shall not be discernable from
38 property lines.
39 vii. Any lot with chickens shall either comply with these requirements by
40 June 1, 2016 or remove the chickens.
41 (f) Dormitories accessory to schools, provided that such dormitories conform to the bulk
42 regulations of the RG-1 zone. For purposes of computing bulk requirements, each four
43 rooms shall be considered one dwelling unit. Parking shall be calculated as identified
44 in Article 6-Off-Street Parking, Section 3-Required off-street parking spaces,
45 Paragraph 3.1-Schedule of requirements.
46 (g) Customary home occupations, provided that:
47 i. No display of products, goods and/or signs shall be visible from the street.
48 ii. Such home occupation shall be incidental and secondary to the residential use of
49 the premises and shall be conducted in the principal building by the resident or
50 residents that reside therein.
51 iii. Nonresident assistants or co-workers shall be prohibited.
52 iv. Such home occupation shall not occupy more than 30 percent of the area of one
53 floor in the principal building.
54 v. There shall be no exterior effect such as noise, traffic, odor, dust, smoke, gas,
55 fumes, radiation, or electromagnetic interference.
56 ADOPTED: *
57 SYNOPSIS
58 The proposed amendment would regulate the keeping of chickens in one-family residence zones.
59 (SPONSORS: HARE, HUTCHISON, AND COLE)
60 Actions History
61 02/22/2016 - Scheduled for Introduction/First Reading - City Council
62 S:\ORDINANCES\2016\DRAFT\ORDINANCE #2016-01 APDX B-ZONING, ART 3, SEC 1, SUBSEC 1.15 ACCESSORY USES (FOWL)\Proposed Ordinance #2016-01 SS#1-Fowl-First
63 Reading.wpd
Page 140
C F
M I-16-02 I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: February 3rd, 2016 D S
O H
V A
E L
R
APPLICATION: Text Amendment: To Disallow Keeping of Fowl
FILE #: MI-16-02 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Timothy P. Mullaney Jr., Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. This office has no objection to the text amendment.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2012 NFPA Life Safety Code (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2012 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
Page 141
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 27, 2016
APPLICATION: TEXT AMENDMENT: TO DISALLOW KEEPING OF
FOWL
FILE #: MI-16-02
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Paul Waddell - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: ELECTRIC - 302-736-7070 PUBLIC WORKS – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. Our office has no objections to the proposed text amendments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. None
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER / STORMWATER / SANITATION / STREETS / GROUNDS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 142
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: January 27, 2016 T
===============================================================
APPLICATION: Text Amendment: To Disallow Keeping of Fowl
FILE#: MI-16-02 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Jonathan T. Moore PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
DelDOT has no comments regarding city and state code at this time.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
DelDOT has no recommendations at this time.
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT has no advisory comments at this time.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.