The Regular Quarterly Workshop Meeting of the City of Dover Planning Commission was held
on Wednesday, August 19, 2015 at 12:00 noon with Chairman Mr. Tolbert presiding. Members
present were Mr. Cregar, Mr. Tolbert, Mr. Holt, Mr. Baldwin and Ms. Still. Mr. Holden, Dr.
Jones and Colonel Welsh and Mr. Ambruso were absent.
Members present for the Joint Workshop from the Board of Adjustment were Mr. Sheth, Mr.
Hufnal, Mr. Keller and Colonel Ericson.
Staff members present were Mrs. Townshend, Mrs. Melson-Williams, Mr. Cook and Mrs.
Mullaney.
WORKSHOP DISCUSSION WITH BOARD OF ADJUSTMENT
Each member introduced themselves.
Mrs. Townshend stated they invited the Board of Adjustment to attend this Planning
Commission Workshop because there have been a number of cases over the years that when they
come to the Board of Adjustment for a Variance, it makes perfect sense to do what the applicant
is requesting. The question is “Why don’t we just allow the Planning Commission that
discretion?” or “Why don’t we just change the Code so it’s allowed?” They thought it was a
good opportunity for the two (2) bodies to talk about their perspective on what they see in terms
of what they are reviewing and how they might be able to, as they move forward with their
Ordinance revisions and fix some of the problems that they are finding that are getting people to
the Board of Adjustment. They did talk this morning at the Board of Adjustment meeting about a
number of issues: signs in industrial parks, LED signs, signage issues in general, and the
Comprehensive Sign Plan. With the purvue of that piece, the Planning Commission has
discretion over a number of things but not the sign setbacks and not the exclusion zone that’s
taken some applicants to Board of Adjustment.
The other big thing that tends to come up is parking. She thinks at the last Planning Commission
Quarterly Workshop, they talked a little bit about parking and the need to re-visit some things in
the parking requirements. In particular, the restaurant parking requirement and the issue of over
parking has taken people to the Board of Adjustment. One reason is because of the City’s
restaurant calculation that has created some challenges. The other thing is if you have a small
parking requirement. For example, a plan that requires six (6) parking spaces then 25% over-
parked which means a space or two (2) and it creates a problem. An example was the Dover
Family Dentistry building that came before both bodies down on South State Street. The parking
requirement under the Zoning Ordinance would have the maximum parking not even
accommodating all of the staff. They need to look at some changes in that regard.
Mrs. Melson-Williams did some (summarizing of) things; she looked at what they had seen at
the Board of Adjustment between 2013 and 2015. Some of these things have already been
addressed by Text Amendments that they have done. There is the General Residence Zone Text
Amendment that is pending that will deal with some of the things. For instance, one application
didn’t go to the Planning Commission at all because it was a lot line adjustment. Central Habitat
Page 2
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
for Humanity needed to adjust lot lines on South Kirkwood Street but because they weren’t
going to meet the minimum lot widths they needed to get a variance. There is a Text Amendment
pending right now that would allow administrative discretion for lot line adjustments in that zone
because they know that this is an issue throughout the zone. They did something similar back in
2006 for existing lots, they put in place an administrative waiver process to allow Staff to grant
waivers from the setbacks and other bulk standards. For instance, the RG-1 (General Residence
Zone) has a minimum lot size of 7,500 square feet but they have a lot of 5,000 square foot lots.
To put a house on these lots, the minimum lot width is sixty (60) feet but many of the lots are
fifty (50) feet and they can’t meet the setbacks. In 2006, they put it in the Code where that can be
done administratively as long as the lot was in existence at that point in time. What they are
finding is that they need to have a little more discretion to be able to adjust lot lines if they are
not creating new lots.
They have seen nine (9) variances in terms of parking. With the size of the parking space, if you
recall at Compass Pointe, they wanted to do some compact car parking. Again, that is something
they probably need to look at addressing. They have had the issue of the number of parking
spaces in the IPM (Industrial Park Manufacturing Zone) a couple of times. She thinks that was
with Proctor & Gamble and Playtex. It’s this issue of a manufacturing facility with one (1)
parking space per eight hundred (800) square feet; that only works for some types of facility. So
maybe they create some flexibility that if they use the employee count then they could have the
Planning Commission or Staff do something without it going to the Board of Adjustment. The
idea is if things just make sense and it’s not something peculiar to the property, they would like
to avoid the Board of Adjustment. She thinks the members of the Board of Adjustment would
like to be avoided because it puts them in tough spot because with the Board of Adjustment, it’s
a legal standard and the legal standard isn’t just “Well gee this makes sense.” The legal standard
is, there’s something specific to the property and there’s an exceptional practical difficulty.
Sometimes the exceptional practical difficulty is that the City’s Ordinance just doesn’t make
sense and they want to avoid that.
In terms of signage, they have the issue of the setback from the right-of-way and exclusion
zones. They have had Comprehensive Sign Plans that come to the Planning Commission and
then have to go to the Board of Adjustment on those issues. Is that something that they should
just put in the purvue of what the Planning Commission can consider?
There have been a few variance requests in the flood plain. Her preference would be to leave that
alone because they do want to try to avoid construction in the flood plain and there may be very
specific circumstances where it’s appropriate because of X, Y and Z. Staff has been working
with FEMA; we are trying to get into their good graces. She thinks that they would be very
concerned if the City tried to move away from the level of protection that they have now. We
also have the issue of signage adjacent to residential. The Planning Commission may not even
realize that this is an issue. The Modern Maturity Center went to the Board of Adjustment last
month for a Sign Variance where they are limited by virtue of having property lines that are two
hundred (200) feet from residential properties. They are limited to thirty-two (32) square feet. On
Route 8, thirty-two feet is just not sufficient signage. You have kind of a hodgepodge of
residential uses scattered throughout and it really creates almost an unfair situation just by virtue
of where the residential uses are. That was a Variance that was granted.
Mr. Cregar questioned if Mrs. Townshend felt that that was a legitimate use of the variance
2
Page 3
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
process for the Modern Maturity Center? Responding to Mr. Cregar, Mrs. Townshend stated that
she thinks that there could be but there are things that quite honestly don’t make sense in the
Code. One is if they made some changes to the Comprehensive Sign Plan process it could have
been something that the Planning Commission had discretion on. So you don’t have that same
legal standard; it makes it less uncomfortable to try to shoehorn it in. The other thing for adjacent
to residential is related to property lines adjacent to residential. You’ve got the Modern Maturity
Center which has over six hundred (600) linear feet of frontage. Anywhere on that property, you
are going to have this issue. Even if that sign itself is four hundred (400) feet from the residential
because it’s defined by property lines. She thinks there are some tweaks they can do in the Code
to create less of a conflict and less of a chance of it going to the Board of Adjustment. Again, she
thinks the flood plain cases, as much as the Board of Adjustment loves them, she thinks
sometimes that is the best route. You’ve got a property that’s entirely encumbered by the flood
plain, Staff has said that you can’t build in the flood plain and now you’ve made this property
unbuildable. That is the purpose of the Board of Adjustment, rather than someone having a piece
of their property in the flood plain but that’s where they want to put their shed. She thinks no
matter what they do with signs, there will always be Sign Variances.
Mr. Cregar stated that with the Modern Maturity Center, you have a unique property there with
X number of feet with these property lines. Isn’t the Board actually for those types of unique
situations? Responding to Mr. Cregar, Mrs. Townshend stated if that property were on Route 13
it could do a Unified Sign Plan. Part of the discussion that they have had internally is should that
be under the Sign Code. Route 13 is an urban principal arterial and Route 8 is an urban minor
arterial. Should they look at what the roads are classified and if you have four hundred (400) feet
of frontage on an urban minor arterial, should you be able to get a Comprehensive Sign Plan?
Sitting in the Board of Adjustment member’s chairs, they spend an hour and a half on that case
today. It’s very difficult for the Board because sometimes they feel like they are stretching to
meet that standard and we try to avoid that.
There are places where the Board of Adjustment is “you ask and you get it”. They have had Max
Walden come in to do training and they have gone to the Institute for Public Administration
training. Our Board of Adjustment right now is very well educated and understands the narrow
legal wiggle room that they have. So when they start to get to the edges of it, she thinks it
becomes less comfortable. That is her observation as she watches the meetings.
Mr. Sheth stated that he thought she had covered most of the points that included Scarbourgh
Road and Route 8. If you can treat all as you would Route 13 maybe it will solve many other
issues.
Mr. Hufnal questioned who determines whether the road is major or minor because Route 8 is a
major road that runs east to west in Delaware. Responding to Mr. Hufnal, Mrs. Townshend
stated that it was defined in the Sign Regulations. It doesn’t match DelDOT’s classification
which is a whole different issue but it is defined in the Code.
Mr. Hufnal stated that maybe they should look at the road classifications because the fact that
Route 8 is a major road east and west and there’s a lot of construction on that.
Mr. Keller questioned what DelDOT’s classification is for Route 8? Responding to Mr. Keller,
Mrs. Townshend stated that it is probably a minor arterial but parts of Route 13 are considered an
3
Page 4
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
urban minor arterial.
Mr. Sheth questioned if the area variance could go before City Council and Planning
Commission. Responding to Mr. Sheth, Mrs. Townshend stated that it all goes through the
Planning Commission and the Planning Commission works with Staff to kind of direct them in
terms of ordinance revisions, as does City Council.
Mr. Sheth stated that the demographic situation is changing with houses and people getting old
and children not staying in Dover as well as handicap concerns. Other issues are area variances
that also come as a variance all the time. They normally come as a sign, parking and area
variances. Responding to Mr. Sheth, Mrs. Townshend stated that she thinks the ones that seem
the most difficult sometimes are signs. Sometimes they want that signage; but do they need that
signage? There are making a case that it could have been submitted at a disadvantage.
Colonel Ericson stated that they had that problem too at the business park with building a
monument sign which really didn’t meet the requirements. Responding to Colonel Ericson, Mrs.
Townshend stated or a very small wall sign that you wouldn’t see from anywhere.
Mr. Cook stated let’s say they change the Sign Ordinance, something goes to the Planning
Commission and they say no, does the applicant then have an appeal process to the Board of
Adjustment? Responding to Mr. Cook, Mrs. Townshend stated no, the appeal is through the
courts from a Planning Commission decision.
Colonel Ericson stated that they also talked about LED lights that are very obnoxious like on
Route 13 at the car wash company. What exactly do we want to allow? They can be very
disturbing flashing and moving; it’s a distraction to traffic.
Mr. Sheth stated that some items are “grandfathered” rather than an area variance and we no
longer have a tall sign on Route 13 such as Farmer’s Market or the old Nichols. Many of the gas
station signs have changed. It looks much better when you enter the City of Dover. That is the
last LED sign at the Race Track Car Wash. If he would have gone to the Board of Adjustment, it
probably would have never happened. Responding to Mr. Sheth, Mrs. Townshend stated that it
was nonconforming, abandoned and she will take the blame on it.
Colonel Ericson stated that they have had a great working relationship with the Planning Staff.
The Staff reports are outstanding and they give them a good start. Responding to Colonel
Ericson, Mrs. Townshend stated that Mr. Cook is improving them daily.
Colonel Ericson stated that he agreed. It’s made their job a lot easier. Like any kind of court, you
listen to testimony, more information comes out than before and you may go in a different
direction than Staff recommended. It isn’t Staff’s fault. It’s the individual who didn’t tell them
the entire story.
Mr. Sheth stated that he agreed with Colonel Ericson.
Mrs. Townshend stated that one thing that she kind of likes and she has said it to applicants;
sometimes applicants will get their Staff Report and they will be upset because Staff
recommends denial a lot. If they don’t do a good job on the application, Staff doesn’t
4
Page 5
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
recommend approval and they tell the applicant that they need to make their case at the meeting.
But the other thing she tells people is, if you don’t make your case in the application and you
talked her into a favorable recommendation your meeting is not going to go well because the
between Staff and the Board of Adjustment, there is a good check and balance system. If Staff
said approve, approve, approve she thinks the Board would press back because the applicant
does need to make their case. She thinks the way it’s working now, if they don’t make the case in
their written application they show up ready to make it at the meeting.
Colonel Ericson stated that some of them are just the average citizen who’s got a legitimate
complaint but they don’t know how to vocalize; they sit there and stumble. But the questions that
the Board asks finally draw information out of the applicant that they need in order to make a
decision.
Mr. Sheth stated that there used to be a burden of proof on the Board that would now be shifted
to the applicant; now they don’t have to prove to the applicant why or why not. Before that
burden of proof you felt guilty about it, but now as Mrs. Townshend said, it depends on how well
the applicant presents their case. Responding to Mr. Sheth, Mrs. Townshend stated from a
fairness standpoint, the reality is that if somebody doesn’t make their case in the application and
they as staff make the case for them and don’t do it for another applicant either because it doesn’t
hit them square in the eyes the same way, it creates a real challenge for the City. If they are being
accused of not being consistent, how do they handle that?
Mr. Cregar stated that he knows Mrs. Townshend was jotting so notes down of things to
consider. What notes have been jotted down so far? Responding to Mr. Cregar, Mrs. Townshend
stated that they have talked before about the issue of parking. She has written down looking into
how they deal with LED signs, from a sign standpoint looking at Route 8 as a principal arterial,
looking at the distance in terms of adjacent to residential for signs and the issue of how they deal
with industrial park signage. The other thing that was mentioned during the Board of Adjustment
meeting held this morning and she doesn’t think this was an issue when the economy was
kicking. We have had quite a few applicants have to come back to the Board of Adjustment
because their variance expired. With the Planning Commission, a Site Plan is alive for two (2)
years and then a one (1) year extension can be granted. The way the Board of Adjustment works,
you get your variance and after it expires, sorry about your luck. It creates challenges. One
thought would be to extend it so that it’s not one (1) year but that it’s two (2) years. The other
thought would be to allow for a one (1) year extension.
Mr. Hufnal stated he would consider maybe not giving them a year because they have already
had a year, maybe give them a free month extension to at least get started instead of giving them
another year. Another year seems like a long time. Responding to Mr. Hufnal, Mrs. Townshend
stated that the other thing they could do is make the expiration eighteen (18) months. She agrees
that two (2) years is a long time.
Mr. Hufnal stated that a lot of things could happen in two (2) years.
Mr. Keller stated that it could at least initiate some action for accruing whatever the problem
was. It doesn’t have to be started and complete within that period of time but they could start
getting permits and getting some work done. He would be inclined to agree, this morning that
property has been vacant for three (3) years already. Another year has come and gone with the
5
Page 6
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
application approval and expiration. How far do you go with that kind of scenario?
Mr. Sheth stated in that case, applicant would feel that they have fifteen (15) months.
Responding to Mr. Sheth, Mrs. Townshend stated that if they make it eighteen (18) months then
it keeps it out of the Board having to worry about how long to extend it.
Mr. Sheth questioned if they could remind the applicant that they have three (3) more months to
go before the application expires? Responding to Mrs. Townshend stated that they could.
Mr. Keller stated they could use some triggering mechanism administratively.
Mr. Sheth stated even extensions should have an associated cost. Maybe charge $200 for the
application extension too so that will speed the applicant up. But if there is no cost associated
then they will use the fifteen (15) or eighteen (18) months granted by the Board.
Mr. Cook stated that they extend the application and the clock runs out, the original variance
expires but if they have an exceptional practical difficulty that prevented them from completing
it, do they then apply for a another variance for the same issue? Responding to Mr. Cook, Mrs.
Townshend stated yes. It could be one (1) year expiration with the ability for Staff to
administratively extend it with a written request or if they aren’t comfortable administratively
extending it then they would give it to the Board. She wouldn’t want to have to hold a Board of
Adjustment meeting just for the sake of doing an extension.
Mrs. Townshend stated just to give everyone a sense of other Code amendments they are in the
process of doing. Planning Commission will review next month amendments to the General
Residence Zone and that is really to help facilitate re-development of residential lots in the
Downtown area in a way that improve the community. Recently they re-did the commercial
zones; they need to finish up the industrial zones. They need to re-do the residential zones, they
need to do a full review. Right now, they have the authorization to hire an additional Planner.
She would say that they are pretty way behind on ordinances. They have always been good about
keeping Ordinances forthcoming to keep things fresh and they just simply have not had the time
to do it because they just don’t have the staff time to do it. They have advertised, did interviews
and they are re-advertising. Unfortunately, it looks like Sussex County, DelDOT and DNREC
are all hiring Planners so it’s a competitive market. They are back out looking and they will
hopefully get somebody in the next few months.
Mr. Hufnal stated that he thinks the main points that they were concerned about were covered.
Colonel Ericson stated that it was interesting this morning when it was pointed out that Golden
Corral issue. They had an abundance of land and were requesting more parking spaces but as
Mrs. Townshend pointed out, there are other considerations given. Responding to Mr. Keller,
Mrs. Townshend stated that Colonel Welsh is not at the meeting unfortunately because he was
one of the big advocates of this. If you recall, back in 2009 that they put in the maximum
parking. With that specific site, up behind Pizza Hut, you may remember the applicant came in
with this big shopping center design and they had Dick’s Sporting Goods as a tenant. They were
going to have more than twice as much parking as they needed; five hundred (500) excess
parking spaces. Planning Commission didn’t like it, Staff didn’t like it but then you are backed
into a corner with the corporation going here requiring it. If it’s an Ordinance, it’s a lot easier to
6
Page 7
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
go back to the corporations and say sorry you are going to have to share the parking. If it’s just
discretion they are going to press has hard as they can. That’s where that came from because the
City has so much parking that is never used. It was a concern of members of the Planning
Commission that they’re being pushed to approve it which is where they go to the maximum
number of parking spaces. The flip side of that is that as soon as you adopt an Ordinance you
find out what doesn’t work. Some of it is the 25% where you have a low parking count; it
doesn’t give you any wiggle room. This does need to be addressed. The other issue was it was
always minimum so that fact that they under parked restaurants wasn’t a problem until you put
the maximum on it. For example, if you have been on the Planning Commission for a while you
remember when McGlynn’s went in. There was concern about them meeting the parking
requirement because when the building came in, it didn’t have the restaurant and it just met the
parking requirement. Everybody she talks to say that building doesn’t have enough parking. So
again, the Code under parked restaurants which kind of helped the restaurant who didn’t have
enough parking. But once they capped it, it artificially lowered what they can have so that’s why
they need to re-visit that requirement.
DEPARTMENT OF PLANNING AND INSPECTIONS UPDATE
Summary of 2015 Applications
Mrs. Townshend stated that in 2007 they had thirty-seven (37) variance applications. That was
definitely a spike but they have had eleven (11) already this year. They are tracking a little ahead
of where they were.
Mr. Sheth stated that during that time the applications had changed. Mrs. Townshend concurred.
Mrs. Townshend stated that the Board was really saying “no” a lot in 2006 and 2007 from her
recollection; there were a lot of denied variances.
Mr. Sheth stated that they had five (5) or six (6) cases many times. Responding to Mr. Sheth,
Mrs. Townshend stated they now we have sometimes two (2) or three (3) months where they
don’t meet.
Mrs. Townshend stated that they actually do have an Annexation this quarter that you will see
next month. Their application volume is a little bit lower than they have been. She knows from
Staff’s perspective and the City Manager’s perspective, there’s a concern because if we don’t see
it at the Planning Commission they aren’t going to see it on tax base or Building Permit revenue.
The other piece of that is there are a lot more things that can be done administratively but these
count the administrative reviews as well. They are a little low this year but the projects that they
have this year have been good projects. They actually have issued permits for the fit-out at State
Street Commons which has been sitting vacant as a shell for a number of years. The Walmart re-
development stuff is kind of a big project. So some of the stuff that they are seeing is really good
but we just aren’t seeing the volume that we used to.
Mr. Hufnal stated that he could see them having more signs because of all the Walmart re-
development and the one next to Delaware State University that is being remodeled; that’s
probably going to be a sign issue. Responding to Mr. Hufnal, Mrs. Townshend stated that the
Walmart sign will not come to the Board of Adjustment; it’s going as a Comprehensive Sign
7
Page 8
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
Plan.
Comprehensive Plan Amendments 2015 – Adopted April 13, 2015, Application MI-15-01,
Ordinance #2015-01
Mrs. Townshend stated that the Comprehensive Plan Amendment was the Muriel Schwartz
property, that application was approved. She did notice yesterday when she rode by that she
needs to talk to Code Enforcement because the overgrowth is growing into the right-of-way.
Research Activities
• Update on Research for Ordinance Amendments
Mrs. Townshend stated that a lot of efforts have been focused on the Downtown which is why
you are going to see the General Residence Zone stuff. She thinks that’s the main thing. They
know that they need to do parking. Now they know that they need to do signs. Once they have
the Staff available, they know they need to do a re-write of the Subdivision Regulations and an
update on the Residential Zones. Those are going to be big projects; they are just not there yet.
They have also been working on the RC (Recreation and Commercial Zone). In a perfect world,
this would have come to the Commission months ago. Dover International Speedway is
interested in annexing the balance of The Woodlands which would be good from the perspective
of right now when you have major events they have split jurisdictions. Even talking to the
Speedway for instance, there are things that we require through the Zoning Ordinance in terms of
camper layout, camper permits, and the Fire Marshal’s patrol that isn’t required on the County
pieces. The Speedway people try to keep people in compliance and they say “what about those
people over there?” There are a number of reasons why it’s good thing. There are amendments to
the RC (Recreation and Commercial Zone) that have to happen before they can make application
and it keeps getting pushed two (2) weeks. That is her bad because it’s her project so that’s the
other one that hopefully the Commission will see this fall. It has to be done this year because
they can’t have another season of these festivals without this being addressed. It also allows them
to be more consistent in the noise enforcement. The draft that is being written had noise hours.
They are not going to be able to control what happens off the site if it’s outside of the City. Some
of the after-party stuff has gone until 4:00AM. They want to be able to address that and the
Speedway does as well.
Mr. Tolbert stated that he is looking for the festivals to begin lasting a whole week at some point.
Responding to Mr. Tolbert, Mrs. Townshend stated that’s why they don’t want to wait too long
to get on this stuff because now you have Firefly and then Big Barrel and they will be adding
Punkin Chunkin. They have had this discussion about DelDOT and the Police Department who
are very involved in the pre-planning and very event focused. She thinks what they need to deal
with on the planning side is okay that’s fine but now it’s not isolated to one (1) big event a year
or two (2) big events a year. The reality is as you have successful event; there’s going to be more
demand for successful events there. She and Mr. Koenig have had the discussion with DelDOT
for instance of okay it’s fine to have the road closed for these events but how do we deal with
this on a long term basis because if it becomes ten (10) to twelve (12) events a year, is that a fair
burden on the community who lives there. They do need to deal with the big picture and how
they deal with these events.
Mr. Tolbert stated that the thing that really got his attention is all the tents that it had. It just
didn’t look like it was a safe situation. Responding to Mr. Tolbert, Mrs. Townshend stated that it
8
Page 9
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
was less concerning this year. Last year it was traffic, traffic, traffic and there were areas where
you couldn’t get vehicle access. Dover Downs agreed that was not acceptable so that was greatly
improved this year.
Current Studies and Projects
• Transportation Improvement Districts
Mrs. Townshend questioned if DelDOT Staff are doing the data modeling. Responding to Mrs.
Townshend, Mr. Cook stated yes.
Mrs. Townshend stated that at the end of the day, they will end up with a big list of
transportation improvements that need to happen along Bay Road and Route 13. They are going
to push to get those things in the Capital Transportation Plan. They will collect the fee for
improvements associated with projects who will not have to do a Transportation Improvement
Study. The way we have categorized it is any project that goes through the Planning
Commission. There will be projects that they don’t catch like renovations of an existing building.
It’s a long process.
• Citywide Recreational Needs Assessment
Mrs. Townshend stated that Mrs. Melson-Williams has copies of the Recreational Needs
Assessment. This is scheduled for approval by City Council on Monday, August 24, 2015 and
this will be the driver of how they do their capital planning for the City parks. One of the
Ordinances that will likely come out of this is how they deal with open space in residential
developments. Apartments are one thing but HOA management of open spaces is not necessarily
in the best interest of the City or the residents. They are going to be looking at other ways and
maybe there will be a fee instead.
• Bicycle Plan and Pedestrian Plan for Dover
Mrs. Townshend stated that they are still continuing to work with the MPO to improve their
bicycle and pedestrian facilities and implement that plan.
Program Updates
• Designation as Certified Local Government
Mrs. Townshend stated that Mrs. Melson-Williams is passing information around about the
designation as a Certified Local Government. Dover is now a Certified Local Government in
terms of Historic Preservation by virtue of having a Historic District Commission and Historic
District Guidelines and Codes that protect out Historic District. That also makes the City eligible
for grant money through the National Park Service via the State. She found out from Mr. Tim
Slavin that the City will not get money this year; they will get money next year and he told her
exactly how much it is. Their plan is to get a grant and hire a consultant to help them with the
Historic District Guidelines. That is something that they tried starting in house and they just
don’t have the time; its very labor intensive and they need to sub it out.
• Downtown Development District Program
Mrs. Townshend stated that the Downtown Development District Program is moving along. The
legislature funded the program at 8.5 million dollars for the current fiscal year which was
wonderful because they were worried that there wasn’t going to be any funding. As it turns out,
it appears Dover will have the first two (2) small projects completed. One is an owner occupied
residence where the owner has done some renovations and another one is a new home where the
9
Page 10
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
builder is working with NCALL to try to get the house to be owner occupied. We expect that
there will be some type of a ceremony that they look to have the Governor at in September. It
will recognize the completion of those first projects but also kick off the new round of large
project funding and try to drum that up. She sent an email with an attachment to the State
Planning Office requesting a small change in the City’s Downtown Development District
boundary to take in the properties between Loockerman Street and The Green that front State
Street and the area of Water Street between State Street and Governors Avenue. That would
bring us to 224.9 acres in a maximum allowable district of 225 acres. It would also guarantee
that we have a good large project because the interior fit-out for State Street Commons is like a 2
million dollar project. They have been working with a lot of people who are working on small
projects. For example, the old Smither’s is one of the projects. She thinks she will be meeting
with Bel Boutique in the near future. They have not had a lot of large projects so the next
deadline is December 1st and they are really hoping that some of these large projects come
together to apply for the funding reservation.
Mr. Cregar questioned if there was any interest in the old Acme site? Responding to Mr. Cregar,
Mrs. Townshend stated tepid interest. She is not sure that it’s a strong enough interests that it
will have a project. There are significant challenges on the New Street side of that piece with
some of the City’s problem properties being adjacent to the Acme site. That is creating
challenges for them.
They have the Restoring Central Dover Plan that Mr. Joe Myer came and talked to the
Commission about. NCALL has received $750,000 Implementation Grant over five (5) years
from the Wells Fargo Regional Foundation that includes staffing. NCALL has now hired a
Revitalization Coordinator who will start next week and they have hired a Community Organizer
who will work for the Revitalization Coordinator who will start on September 8, 2015. NCALL
is very involved. The City is very involved; they are working with Central Delaware Habitat for
Humanity and they are working with Milford Housing Authority. They had a really good
meeting with Wesley College and they are really trying to strategically determine how to get
these things done. In some cases the City has acquired property where they have liens and they
are working to transfer them to Habitat. Habitat has purchased properties at Sheriff Sales and
they have bought them through regular contracts. Habitat’s efforts are vastly changing Kirkwood
Street for the better and bringing in homeowners. She and Mr. Koenig met with Mr. Brian
Lessard, Mr. Troy Wyndham and Mrs. Jocelyn Tice a few weeks ago. Mr. Lessard is the
President of the Board and he and Mr. Wyndham run the Building Committee. If you look at
South Kirkwood Street, Mr. Lessard’s direction was no beige. Those colors pop and she thinks
the style house is consistent with the character of the area. We have all of those good efforts
going and we are being very strong on the enforcement side as well. Not everybody’s happy
about that but if we are trying to encourage people to make an investment and if we are say this
is a place worth buying for your house or worth starting a business, we also need to make sure
that there’s not trash everywhere or overgrown lots or boarded up houses that are in the process
of falling down.
We are doing a walk through that was organized by Councilman Sudler and Councilman Slavin
of the Lincoln Park Area this weekend. We want to be responsive to the concerns of the residents
over there. The City is going to lead a Downtown Development District Cleanup Day on
September 19, 2015. We have only just started planning it but it is something that she and Mr.
Koenig have discussed and they are both very committed to having a strong showing of City
10
Page 11
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
Staff out there.
Mr. Cregar stated that he lives Downtown and he wants to know who checks the street lights. He
just turned in eight (8) street lights from State Street to Water Street in The Green area and they
were very good at taking care of that but he had to turn them in. The other thing is the Capitol
Complex has numerous street lights out around that area and he knows the City isn’t responsible
for that. Responding to Mr. Cregar, Mrs. Townshend stated that the Electric Department does
street lights but she will find out whether it’s something where they send Staff out.
Mr. Cregar stated that anybody that’s working at night time has to be going by there and seeing
lights that are out. If we are trying to improve the walkability, particularly at night for some of
these events, street lighting is very important.
Mr. Tolbert stated that they were told by the Electric Department when they have street lights out
in their development to make them aware of it and to let them know the location of the light.
Responding to Mr. Tolbert, Mrs. Townshend stated that the question is, is there a proactive effort
to improve the process.
Mr. Holt stated that he called in a couple lights that were out and they came out promptly to
change the bulbs.
Mr. Cregar stated that all he had to do was give them the number on the street pole and they
know where it is. He had no problem with them responding; the problem was that those lights
were out for a very long time and he thinks someone should notice them. Responding to Mr.
Cregar, Mrs. Townshend stated that the City needs to proactively look for these things because
the drug dealers aren’t going to call them in. The people who are doing the things that benefit
from the lights being out are not going to call the Police Department about the lights being out.
Mr. Cregar stated that there was a number of lights out on Kings Highway near that nice
Governor’s Café place. We just need to make sure that the lights are functioning.
Mr. Holt stated that he thinks the problem is that a lot of residents don’t know who to call about
the lights being out. He has had a couple of calls from people asking who to call and these are
people who have been in the area for a while. He is wondering if maybe an informational sheet
could be sent to everyone with that type of information on it. Responding to Mr. Holt, Mrs.
Townshend stated that she and Mr. Koenig have talked about doing an outreach about helping
make Dover attractive. They have talked about things like people who will cut their grass but
they won’t weed whack along the curb line so the grass is growing over the curb line or there’s a
utility pole in the right-of way and everything’s nice accept the twelve (12) inch tall weeds along
the pole. They are working on doing some type of a public outreach to say “help us with these
things”. The reality is that you become almost blind to them after a while. You go by it every
day; you don’t see it and then somebody points it out and you notice that it does look bad. That
might be one of the things they could add in the help keep Dover safe and beautiful.
Mr. Tolbert stated that they also cut the grass and the shavings go all over the street. Responding
to Mr. Tolbert, Mrs. Townshend stated that was a Code violation.
Mrs. Townshend stated that she thinks some of the things that they are doing for the Downtown
11
Page 12
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
Development District we will end up taking on Citywide. Trimming the weeds on the curb is a
real problem Downtown but it’s also a problem elsewhere; it’s just not too big of a problem.
Some people seem to think if the litter blows into their yard, it’s not their trash so it’s not their
problem. At the end of the day if it’s in her yard she is going to pick it up. She has had to pick up
cigarette wrappers and beer cans of stuff that she can tell you she didn’t drink but if it’s in her
yard, she is going to pick it up. The thought is if they sell some type of public outreach, maybe
people will open their eyes. Maybe they can take the blinders off that everyone tends to walk
around with because they are caught up in their walks. She is looking forward to a very strong
relationship with the Staff that NCALL has hired. She was on the Selection Committee and she
was very pleased with the applicants as a whole and the applicants that were selected.
• Restoring Central Dover Community Plan
Mrs. Townshend stated this was already discussed under Downtown Development District
Program.
Mrs. Townshend stated that the Stormwater Survey is from the Public Works Department. If you
haven’t filled it out, they beg you to fill it out because they are trying to get input. There are
extras here, feel free to share it with friends and neighbors.
Mr. Ruggerio Wilson sent a thank note to the Planning Commission but also acknowledging
Staff’s efforts in helping keep them on the right track.
EDUCATION AND TRAINING OPPORTUNITES
Mrs. Melson-Williams stated that the University of Delaware trainings don’t start until after the
new year.
Mrs. Townshend stated that the UD trainings will start in January; the same series. They have
talked about expanding what they do but they haven’t gotten there yet.
OPEN DISCUSSION
Mr. Tolbert stated that he was glad that the Board of Adjustment was here because his questions
and concerns were answered.
Mr. Baldwin stated that here recently he is getting a lot of calls from seniors about the blue LED
after-market headlights on automobiles. Who do you contact about those lights? Someone has
had to of gotten a permit to sell these things. It’s bad for seniors because their eyes are bad.
Mr. Tolbert stated that they seem to be legal.
Mr. Holt stated that if they were illegal, they wouldn’t be allowed to have them.
Mrs. Townshend stated that Mrs. Melson-Williams is going to research it; it’s not a zoning issue
but she might be able to find something out.
Mr. Cregar questioned if Staff needed anything from them? Responding to Mr. Cregar, Mrs.
Townshend stated no. She thought it was good to have the Board of Adjustment here. She thinks
maybe they should do it periodically with the Board of Adjustment and maybe the Historic
District Commission also.
12
Page 13
CITY OF DOVER PLANNING COMMISSION AUGUST 19, 2015
Meeting adjourned at 1:12 PM
Sincerely,
Kristen Mullaney
Secretary
13