This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
Page 1
CITY OF DOVER
BOARD OF ADJUSTMENT MINUTES
June 17, 2015
A Regular Meeting of the City of Dover Board of Adjustment was held on Wednesday, June 17,
2015 at 9:00 A.M. with Chairman Sheth presiding. Members present were Mr. Hufnal, Colonel
Ericson, Mr. Keller, Mr. Senato, and Chairman Sheth.
Staff members present were Mrs. Townshend, Mrs. Purnell, Mr. Cook and City Solicitor Nick
Rodriguez.
APPROVAL OF AGENDA
Mr. Hufnal moved to approve the agenda as submitted, seconded by Mr. Senato and
unanimously carried 5-0.
APPROVAL OF THE REGULAR BOARD OF ADJUSTMENT MEETING MINUTES
OF APRIL 15, 2015
Mr. Keller moved to approve the meeting minutes of April 15, 2015 as submitted, seconded by
Mr. Hufnal and unanimously carried 5-0.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATION
Mrs. Townshend, Director of Planning and Community Development stated that the meeting
would be conducted in accordance with the agenda. There are two items (new applications) on
the agenda under New Business. The application file will be read, and the floor will be opened
for questions of the applicant by the Board and for public testimony. If the Board needs to
consult the City Solicitor they will adjourn to discuss legal matters. If the applicant must leave,
they can contact the Planning Office at 736-7196 to learn of the Board’s decision. A formal
notice of the decision will be mailed to the applicants. Approved variances expire after one year
if the approved project has not commenced.
All public notice for the new application on the agenda today was completed in accordance with
code requirements. The meeting agenda was posted in accordance with Freedom of Information
Act requirements.
NEW BUSINESS
Applicant #V-15-08
1255 College Park Drive. Cellco Partnership dba Verizon Wireless has applied to the Board of
Adjustment for a variance from the requirements of Article 4 § 4.16 of the Zoning Ordinance
pertaining to maximum permitted building height in order to allow construction of a 158 foot
telecommunications tower and associated facilities. Subject property is zoned M (Manufacturing
Zone). The Tax Parcel is ED-05-067.00-02-12.06-000. The owner of record is Bay Developers Inc.
Mr. William Cook Exhibits for the record: Staff Report and plans submitted by the applicant.
The legal notice was published in the Delaware State News on June 7, 2015, and the public was
notified in accordance with the regulations.
Page 2
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
Mr. Cook gave a brief overview of the application.
Chairman Sheth questioned if there was any member present who had a conflict of interest and
there was none.
Representative: Mr. Jonathan Jordan, Attorney; Mr. W. Jeffery Nagorny, Project Engineer; Mr.
Paul Dugan, RF Engineer.
Exhibits were distributed.
Mr. Paul Dugan was sworn in by Mr. Rodriguez.
Questions/Answers
The applicants made a presentation in a question and answer format with Mr. Jordan, the
attorney, posing questions to Mr. Dugan, the engineer:
Questions – Mr. Jordan
Answers – Mr. Dugan
Q. Mr. Jordan asked Mr. Dugan to explain what he does for Verizon.
A. Mr. Dugan stated that he was an Independent Radio Frequency Consultant Engineer
specializing in design and performance of radio frequency teller communication systems.
Q. Are your credentials summarized in tab 4 of the binder?
A. Yes
Q. Is Verizon Wireless licensed by the FCC (Federal Communication Commission) to provide
telecommunication service to the City of Dover and surrounding areas?
A. Yes
Q. Does the license appear in tab 5 of the binder?
A. Yes
Q. Explain the factors that lead Verizon Wireless to conclude that the proposed monopole is
necessary at the proposed location.
A. The function of the radio frequency engineer is the on-going design and performance of the
wireless telecommunication system with the explosion of smart phones and hand held devices
that are sold in stores today. Verizon Wireless has had to keep up with the explosive tremendous
growth in data applications. For that reason they have to maintain adequate coverage and
capacity to the area that they are licensed to serve.
Q. Explain this state and why the state cannot get by with a 35 foot tower, but instead needs a
150 foot tower with an 8 foot lighting rod.
A. The proposed facility subject to this application is needed primarily for capacity reasons. The
existing sites in the vicinity of the proposed site location are “in exhaust” and are in need of
offloading of traffic to relieve sectors that are currently over loaded in some sections of the City
2
Page 3
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
of Dover. The proposed facility provides 4G LTE coverage and capacity relief to a heavily
traveled northwest section of the City of Dover in the vicinity of the Delaware State University
including sections of College Road and State College Road, McKee Road (Route 15),
Scarborough Road, and other adjoining roads in the community. The proposed facility is a
capacity offload site which will provide necessary traffic offloading from the two sites identified
on the propagation exhibits as DOV-RACEWAY LIQUORS (gamma sector) and DOV-FOX
HALL (beta sector). The DOV-RACEWAY LIQUORS site is serving Delaware State University
which is currently in exhaust and the DOV-FOX HALL site is facing the City of Dover. That
sector is in need of capacity exhaust.
Q. Can you explain exhaust?
A. The facility is at the level of data that is carrying during the system busiest hour and it is
currently at a level that it is denying service or service degraded where speed has slowed down
significantly.
Q. Why do we need to exceed the 35 foot height limitation?
A. The taller the structure height of the antenna height above ground, the larger the footprint.
The antenna needs to have a line-of-site visibility to the handle subscriber devices to provide
service. The taller the structure the more coverage it provides and more capacity off load to the
adjacent sites. The 150 feet is necessary in order to provide the sufficient amount of traffic
offloading from the two (2) sectors that are currently in need of traffic and capacity relief and to
provide the level of in-building coverage that Verizon is seeking to that immediate area.
Q. Is it true that the current state of coverage and service in this particular area is not up to
Verizon standards?
A. Mr. Dugan concurred.
Q. Are your findings summarized in the report of tab 7 that was prepared?
A. Yes
Q. Will the proposed installation comply with all the applicable FCC (Federal Communication
Commission) admissions and safety standards and did you prepare a report at tab 8?
A. Yes. I prepared a radio frequency electromagnetic field exposure certification to certify that
the proposed facility complies with the FCC (Federal Communication Commission) exposure
limits and guidelines that are put forth to protect the health and safety welfare of the public.
Verizon Wireless provides the upper limit operating parameters in antenna configuration and
calculations are based on the FCC (Federal Communication Commission) prescribed
methodology to determine what is the upper limit ground level exposure anywhere near the base
of the proposed facility. The conclusion of the report is that the upper limit exposures are
hundreds of times below what is considered safe levels of electromagnetic field.
Q. Explain the safety and interference of report (tab 7 and tab 8).
A. Mr. Dugan furnished a non-interference certification which is a discussion of how the
facilities co-exist in the community with no detrimental impact to existing radio frequency
systems.
3
Page 4
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
Q. Referring to tab 3 which states that Dover Air Force Base had no objection to the tower. Did
Mr. Dugan look into the FAA (Federal Airways & Airspace) issues and is that summarized in
exhibit 9?
A. Yes, exhibit 9 is a FAA Screening Certification with an airspace report screen that includes a
database of all public and private airspace registered facilities in the nation. It determines
whether it meets the criteria to require filing with the FAA (Federal Airways & Airspace). Dover
Air Force Base is the closest air facility in this area and the report states that the structure height
does not meet the criteria to require filing with the FAA based on location and height, and
proximity to the nearest air facility.
Q. Would the proposed installation comply with all compliable federal requirements and radio
frequency engineering standards?
A. Yes.
Q. Mr. Dugan in your professional opinion is the proposed facility in this location at this height
necessary for the efficient operation and provision of wireless services to the proposed serviced
area?
A. Yes.
Q. Mr. Dugan in your professional opinion if Verizon Wireless was unable to build a 150 foot
tower with an 8 foot lightning rod at this location would it be at a competitive disadvantage?
A. Yes.
Responding to Chairman Sheth’s question regarding the exhaust and a particular time that
service could not be provided at the present condition (example: Nascar race), Mr. Dugan stated
certain hours of the week are considered busy hours such as Friday afternoon rush hour, often
weeknights after 9pm, usage goes up during certain hours of the day. The exhaust normally
happens when it hits 100% of its capacity. Therefore, this is when it slows down or is suspended
because of the level of traffic on the system. During Nascar Race and special events Verizon
Wireless puts up (in some cases) temporary sites to handle additional capacity for those peak
loads. Verizon is seeking to (in addition to putting up temporary sites) strategically are building
sites in certain sections of the city. There are a few sites planned in order to off load traffic.
When there is a special event at Dover Downs is the worst time.
Responding to Chairman Sheth’s question whether the engineer had worked with other
competitors, Mr. Dugan stated yes.
Responding to Chairman Sheth’s question whether other competitors had the tall tower in this
area, Mr. Dugan stated that he has done work for the other carriers, but he was not familiar with
their needs in this area. They are all dealing with the challenges of keeping up with the additional
capacity of special events and the metropolitan area such as the City of Dover and keeping up
with the coverage of capacity requirements of this city. The users of this city are demanding on
their networks.
Responding to Chairman Sheth’s question if the tower was built 150 feet tall how long would the
tower provide service (next 2 or 5 years), and if they would come back again for additional
4
Page 5
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
footage and if a 110 feet would serve the same purpose, Mr. Dugan stated that 110 feet would
not meet the objectives because if it was forced to be reduced the tower would require more
facilities in the future to provide service to the customers. This site will provide a complete
solution to the area that it is serving which is the northwest section of the city. Therefore, 150
feet will provide service to approximately ½ to 1 mile in all directions from the proposed facility
location.
Responding to Chairman Sheth’s question whether Mr. Dugan had any supporting technical
research, Mr. Dugan stated that the exhibit presented is a certified independent evaluation
proposed facility. The objectives were outlined in terms of coverage and capacity. The objectives
were explained in terms of what will be achieved, why the height cannot be reduced, and why
the 150 feet is the minimum height to fulfill those objectives, all the existing tall structures
within a ½ mile of the proposed facility location there are no existing tall structures within a ½
mile that are available to Verizon Wireless. Verizon sought location on a water tank and the
owner of the water tank would not make it available to Verizon.
Mr. Dugan stated that this structure provides co-location opportunities, for all the other carriers.
They have master agreements to allow for co-locations between the carriers.
Colonel Ericson stated that he understood the coverage that the 158 feet would be ½ mile to 1
mile, but questioned if it was at 110 feet what would be the mileage. Mr. Dugan stated that it
would be somewhat less than that. It would probably be roughly 75 to 80 percent of full
coverage.
Responding to Colonel Ericson’s question whether it would cover the other substations that they
were trying to change data with and if it was tall enough, Mr. Dugan stated that it needs to be a
certain height to absorb traffic sufficiently. If it was lower it would not absorb a sufficient
amount of traffic. The antenna height is 150 feet with an 8 foot lightning rod.
Responding to Colonel Ericson’s question if AT&T came to Mr. Dugan and would like to put up
antennas and work together using the pole, would Mr. Dugan work with AT&T, Mr. Dugan
stated yes.
Responding to Mr. Keller’s question whether Mr. Dugan had explored or looked at other isolated
single sites, Mr. Dugan stated that the site acquisition people look for existing structures first.
Where existing tall structure are not available, or a sufficient height, or not in a target area then
the site acquisition people have to seek a new antenna support structure where they are not
available. As he could not speak on what other sites might have been considered, but Mr. Dugan
believes that the proposed location is a very benign application considering the buffering of the
industrial and commercial nature of the property. It is buffered with much vegetation that is
backed up to a railroad track. Mr. Dugan was not aware of any residential homes in the vicinity.
It is very well suited for this application from that respect.
Responding to Mr. Keller’s question whether Mr. Dugan was aware of any requirements for
clear or safety fall zones in the reality of a 150 foot structure coming down, Mr. Jordan stated
that the Civil Engineer would be able to answer the question.
5
Page 6
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
Responding to Mr. Hufnal’s question since they were close to high tension lines whether the
towers would interfere with radio signals, Mr. Dugan stated no.
Responding to Mr. Senato’s question whether Mr. Dugan currently had other Verizon towers
within the city limits, Mr. Dugan stated yes.
Responding to Mr. Senato’s question of the difference of the range of the other towers (the
nearest tower) Mr. Dugan stated that the site to the southwest is a little over a mile. As he
referred to the bottom of design report (tab 6) he stated that all the towers are listed in the
immediate vicinity of the structure. It identifies all of the adjacent facilities.
Responding to Mr. Senato’s question whether the height of the towers in the adjacent facilities
were listed on the design report (tab 6), Mr. Dugan stated yes.
Responding to Mr. Senato’s question about the range of signal between DOV-FOX HALL-127’
and DOV-DOVER DOWNS-125’, Mr. Dugan stated that the range that each site will cover is
function of many variables, not just the height of the antenna, such as the density of customers
using the facility at any given time, demographics, frequency of propagation, vegetation, etc. The
facility may be shorter in height, but they may be covering more customers because they may be
in a denser area.
Responding to Mr. Senato’s question whether the request for a higher tower was due to the
location and the non-density and less of a population area, Mr. Dugan concurred.
Responding to Mr. Senato’s question whether Verizon needed a higher tower to spread out to
reach the outer edges of the northwest section of Dover, Mr. Dugan concurred and stated that
you would reach to the Delaware State University buildings and to provide in-building coverage.
There is also a residential or retirement community to the southwest. Every structure and site has
different objectives in terms of how much area it is serving.
Responding to Mr. Senato’s question of the longevity of the tower; Mr. Dugan stated that he did
not anticipate needing another structure within a mile of the proposed facility location. There
will be other need of other areas in the city. This tower is only serving a small area up to 1 mile
in radius from the proposed facility location.
Responding to Mr. Senato’s question of what period of time he would need to put up another
tower in close proximity of the tower ½ or 1 mile down the road, Mr. Dugan stated that he could
not project the future needs, but he did not see a need for a new facility in the immediate area
within the next five (5) years within a ½ mile from this facility.
Mr. Jordan stated that he did not think that anyone could predict the explosion and data caused
by everyone getting smartphones and using internet on their phones. It has been a 50,000 percent
increase in the last few years.
Responding to Mr. Jordan’s question to Mr. Dugan whether each site is designed considering all
the factors, topography and surrounding areas and the rest of the Verizon network, and is the
6
Page 7
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
height of each site based on the particular factors specific to this project; Mr. Dugan stated yes.
The height necessary for this facility is a function of where all the other sites are located it has to
fill in a specific area (like a jig saw puzzle). The facilities work together to create a network in
order to provide seamless services to their users in the area.
Responding to Chairman Sheth’s question whether Del Tech was a part of the study, Mr. Dugan
stated that is likely served by what is identified as DOV-NORTH DOVER structure which is a
195’ lattice tower at 2030 North DuPont Highway. It is likely closer to that facility and well
served by that existing tower.
Mr. Hufnal stated that Del Tech would be going through another expansion very soon as he was
not sure if it was covered by the proposed tower or another tower.
Mr. W. Jeffery Nagorny was sworn in by Mr. Rodriguez.
Exhibits
Questions/Answers
Questions – Mr. Jordan
Answers – Mr. Nagorny
Q. Mr. Jordan asked Mr. Nagorny if he has visited the subject property.
A. Yes
Q. Can you talk about the zoning district and the surroundings?
A. It is the M (Manufacturing District) the particular part of the district as indicated on the site
plan (tab 12) cul-de-sac at the end of College Park Drive. Running approximately north-south is
the existing railroad right-of-way. The parcel is on the southern end of the cul-de-sac and the
proposed location is in the south west corner of that particular parcel. The particular parcel is
fully overgrown with trees and low growth vegetation. It is on the end of a cul-de-sac which is
basically a light industrial development. It is a very appropriate location for this facility.
Q. Is it true that telecommunications towers are permitted in every zoning district as a public
utility use?
A. Yes.
Mrs. Townshend clarified that within the Manufacturing Zone public utility uses are a
Conditional Use which is subject to Conditional Use by the Planning Commission.
Q. Can you briefly describe what Verizon Wireless plans to build?
A. Yes. Verizon Wireless proposing a 150’ tall monopole structure which is basically a single
shaft. It is normally constructed in two or more sections. It is brought to the site and lifted with a
crane. It would have an 8’ lightning rod on top and Verizon would be mounting their antennas on
a platform that is attached to the top of the tower (referring to exhibits 12, Z-1, Z-2, and Z-3).
Typically the number of antennas or platform is constructed with three (3) sectors. Currently we
7
Page 8
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
are looking at four (4) antennas per sector for a total of twelve (12) antennas. The center line of
the antennas would be 150’. The top of the antenna would be at 153’. The top of the lightning
rod would be at 158’. The power and fiber lines would run up on the inside of the monopole and
would not be visible on the outside. He also gave a brief overview of the compound plan (fence
compound 40x40 feet). Electric power and telephone lines are brought into the site to feed the
tower. The ground equipment is the brains of the operation. This is the reason they need a
building on the ground to house all of the information and equipment. The facility will be
surrounded by a 6’ fence with a 12’ access gate tied into the existing driveway entrance. The
driveway will also be improved. The site is approximately 1 acre.
Q. Can you explain the setbacks of the tower from the property line regarding safety?
A. Yes. The towers are designed to never fail. The towers are designed by a manufacturer in
accordance with the current code ANSI-TIA-EIA (American National Standard Institute/
Telecommunication Industries of America – Electronic Industries Association) standard 222-G2.
They reference various criteria for design of the structure (including wind loads). Typically in
the east coast it is designed for a maximum wind load of 90mph and as you get closer to the
coast it increases to 120-130mph. The towers are also designed at the connection point of the
various sections it can be designed as a weak point in the structure so that sections break off and
fold over. From the property line adjacent to the railroad tracks 130’ it is still safe if the tower
was to fall over.
Responding to Mr. Senato’s question whether 90-95mph was the standard wind factor, Mr.
Nagorny stated yes. The American Society Civil Engineers has a Design Standard 7-05 which
has been updated to 7-2010 and they have detailed information on the appropriate design wind
speed for various areas of the country.
Responding to Mr. Senato’s question whether if at the 90mph (hitting at 195mph) speed the top
portion would go first (the way that it has been constructed rather than the entire tower), Mr.
Nagorny stated yes.
Mr. Nagorny stated that typically the foundation for a tower such as this would be a 4 to 5 foot
diameter concrete caisson pier that would go down 25’ to 30’.
Responding to Mr. Keller’s question whether the access way to the structural site would be
paved, Mr. Nagorny stated that it is shown as gravel. There is currently debris around the area.
Under the vegetation is old asphalt. They will prepare the access drive with gravel unless
otherwise stated for the reason that long term stand point gravel does not need the care and
maintenance as asphalt. The gravel is also positive in terms of storm water run-off. They plan to
grade and gravel the access drive.
Responding to Mr. Keller’s question regarding plan sheet Z-2 if the proposal was an 8’ high
chain link fence with three (3) strand barbed wire for security perimeter of the structural facility,
Mr. Nagorny concurred.
Responding to Mr. Keller’s question whether he was aware of any security, fencing, or barrier on
the easterly property line of the site, mainly the line that parallels to the railroad tracks right of
8
Page 9
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
way, Mr. Nagorny stated as he referred to the exhibit that he was not sure, but believed that there
is fencing along the railroad. He stated that it would be a function of the railroad and their
security issues.
Mr. Nagorny stated that although Verizon, AT&T, and others are still bidding towers the
majority of the work that Advantage Engineers has to do is upgrading and changing out the
antennas. For example, at Delaware Technical and Community College if they see growth and
expansion with the existing nearby tower it may be a simpler enough solution that they upgrade
the antennas that are currently there. Originally cell towers were all for voice communication,
but now the bulk of the antennas are going on for data because it takes a lot more bandwidth for
Youtube videos, internet access, etc. Therefore; Verizon and others are exchanging and
upgrading the antennas to increase the efficiency and coverage of the service.
Chairman Sheth questioned if there was any member present who had a conflict of interest with
the case and there was none.
Chairman Sheth opened a public hearing and after seeing no one wishing to speak closed the
public hearing.
Chairman Sheth questioned if there was any additional correspondence for the record. There
was none.
Mr. Hufnal moved to approve application V-15-08 based upon the testimony given today to
include Staff recommendations and Advisory Comments. Mr. Senato seconded the motion and
unanimously carried 5-0.
Applicant #V-15-09
615 Ridgely Street. Clara Ridgley Properties LLC has applied to the Board of Adjustment for a
variance from the requirements of Article 4 § 4.16 of the Zoning Ordinance pertaining to maximum
permitted building height and minimum required setbacks in order to allow construction of a 125 foot
telecommunications tower and associated facilities. Subject property is zoned IPM (Industrial Park
Manufacturing Zone). The Tax Parcel is ED-05-076.08-01-01.00-000. The owner of record is Clara
Ridgley Properties LLC.
Mr. William Cook Exhibits for the record: Staff Report and plans submitted by the applicant.
The legal notice was published in the Delaware State News on June 7, 2015, and the public was
notified in accordance with the regulations.
Mr. Cook gave a brief overview of the application. He also stated that the application was in the
IPM Zone with a different height requirement than the previous application. The height in the
IPM Zone is set according to the distance that the building is setback from the property lines.
There were notes made in the report regarding the site plan that was submitted. The setback
request was based on the center of the tower structure, but the correct method to do the
calculation would be from the edge of the tower. The setback request should be 20 feet and the
information is summarized in a table on page 3 of the report.
9
Page 10
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
Mr. Senato wanted clarification regarding page 2 of the report requesting variances and whether
there were two (2) separate variance requests, Mr. Cook stated yes.
Responding to Mr. Senato’s question whether the two (2) separate variance request should be
combined into one (1) or separate, Mrs. Townshend stated that the Planning Office has always
allowed the variance to be combined as one (1) on the application in the past. The Planning
Office has never required multiple applications for two (2) related variances. The variance can be
split in the terms of the motion.
Mr. Cook stated that the proposed tower and associated compound (referring to page Z-2
compound site plan and elevation) a portion of the compound that is proposed crosses over onto
the adjacent property. At the current time both properties are under common ownership. It does
not impact the variance request, but later on in the Site Plan process there is requirement for
documentation of agreements between the property owners.
Responding to Mr. Senato’s question whether the two (2) properties are common and what
would happen if one of the properties was sold, Mr. Cook stated that it is for the private
properties to resolve. Mrs. Townshend stated that there are multiple ways it can be resolved. It
can be done through an easement, lot line adjustment, or moving the equipment so that it is not
crossing property lines. It is not something directly related to the variance request, but it is an
issue that will need to be addressed as they move into the Site Plan and building permitting
processes.
Responding to Colonel Ericson’s question whether the first Advisory Comment should be
disregarded, Mrs. Townshend stated that it is not an issue that needs to be addressed, but wanted
to make sure that the applicant was aware.
Colonel Ericson asked for clarification regarding the variance request and what exactly is being
recommended for the changes “allow a 17 foot reduction in the side yard setback to permit
construction 23 feet from the property line,” Mr. Cook stated that it was the request as stated on
the application from the applicant and it was based on the applicant site plan on page Z-2. The
applicant incorrectly measured the setback distance from the property line to the center of the
pole.
Responding to Colonel Ericson’s question of how he would recommend the change, Mr. Cook
stated that you could measure to the outside of the pole, not to the center. Mrs. Townshend stated
that it is a 20 foot reduction in the side yard and a 105 foot in the height. Therefore; it would be a
105 foot variance in height. Mr. Cook stated that as noted in the report it is an Industrial area
with a different zoning. There is another shorter cell tower nearby. The addition of another tower
would not be out of character for the properties and its surroundings. In terms of the placement
for the proposed tower on the property, the Planning Office felt that the variances to allow the
tower to be constructed in the corner of the site was more compatible in order to bring the towers
closer together. In doing so, it would keep the visual impacts of proposed use in one place.
Responding to Colonel Ericson’s question whether the towers were both communication towers,
Mr. Cook stated yes.
10
Page 11
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
Responding to Colonel Ericson’s question whether the towers were combined going to one
tower, Mr. Cook stated no.
Chairman Sheth questioned if there was any member present who had a conflict of interest with
the case and there was none.
Representative: Mr. John Tracey, Attorney; Young Conaway Stargatt & Taylor LLP, Mr.
Andrew Peterson, Radio Frequency Engineer, DBM Engineering.
Mr. Tracey stated that for ease of conversation unless the Board of Adjustment objects he would
like to move into the record the testimony at the prior hearing regarding the basics of cell towers
construction and the uses of cell towers.
Chairman Sheth stated that it would make sense.
Responding to Chairman Sheth’s question whether during the discussion if he noticed the change
in the numbers, Mr. Tracey stated yes and he planned to summarize the numbers in the outset of
his application. He stated that he agreed with Mr. Cook statements.
Mr. Tracey stated that in the IPM there is not necessarily a height limitation such that in or of
itself 125 foot tower does not violate the height limitations of the zoning district; it is the fact that
they are asking the tower to be 20 feet from the property line which in turn puts a 20 foot setback
on the tower which in turn then creates the need for the height variance. If it was 100-105 feet
further into the property they would not any variances.
There are several reasons the applicant seeks to locate the tower in the particular location. The
properties are owned by the same individual in different entity LLC’s. The proposed and existing
towers are owned by completely different companies. Verizon Wireless is not on the existing
tower. Verizon is not in this location at the moment. They are not able to locate on the existing
tower for two (2) reasons. The height that was needed to make the system work is not available
on the existing tower; the available height was roughly 40-50 feet lower than what is needed.
Secondly, the existing compound for the tower cannot be expanded to handle the equipment that
would be necessary on the ground to support the Verizon Wireless antennas as noted in his
submission and as repeated by the Department in their submission. The existing tower is boxed
in by existing wetlands, existing buffer areas attached to the wetlands, existing drive aisles, and
existing easements to bring power and other utilities into this area. Since it cannot be expanded
this is the reason the applicant is looking for the additional tower nearby.
Mr. Andrew Peterson was sworn in by Mr. Rodriguez.
Mr. Peterson stated that their application from a Radio Frequency prospective is not a whole lot
different than the prior application. They have capacity issues in the area and the site that
surrounds the area is in a state of capacity exhaustion and as testified earlier by Mr. Dugan that
when the system is busy during the peak times they are unable to handle all of the data requests
in particular and the data through put (network) then slows down and then there are
inconveniences. If they do not address the capacity issues that cause inconveniences it will get
11
Page 12
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
worse over time and lead to voice calls that will no longer go through. More critical data
applications such as police and 911 communications could deteriorate or fail because there is
data exhaustion on the network. They have coverage issues in the area when they talk about
strong and in-building coverage. There is signal in the area if you are out on the street or driving
in your vehicle. When you enter glass and steel buildings, office buildings or densely built
residential areas you will have signal issues. People expect their devices to work regardless of
their location, and more users are using devices at home and in buildings.
If you look at things from a strong and building service perspective there are surrounding sites
that are on air serving Verizon customers. Mr. Peterson gave an overview of maps 3 & 4 as to
where they would be adding more reliable and strong in building services. The signal level will
be able to penetrate steel and glass structures, office buildings, etc. They will be off loading
traffic from the surrounding structures that are currently in the state of exhaustion over stress.
Exhibits
Questions/Answers
Questions – Mr. Jordan
Answers – Mr. Peterson
Q. Could you discuss the purpose of off-loading?
A. The other sites have sectors (array of antennas that point into the area from the surrounding
sites). The sites are overburdened due to carrying excess traffic during peak times. By providing
another site it will be another access point for Verizon Wireless subscribers to get to any of the
services that Verizon Wireless offers. If the Verizon Wireless subscriber is closer to the new
facility rather than one of the other surrounding sites, they will get service from the new facility
and the traffic that they generate will be served.
Mr. Jordan stated that Mr. Anderson’s report talks in detail about the other sites as well as the
explosions in the need for the services.
Responding to Chairman Sheth’s question whether it was possible that a bigger tower could
absorb the smaller tower so that you do not need the two (2) towers, Mr. Peterson stated that this
tower is designed for co-location purposes. If there was a failure with the other tower or a desire
to move over they could co-locate onto this structure. The structure is being designed with co-
location availability and the compound is being designed with co-location expansion ability.
Responding to Mr. Hufnal’s question why the 20 foot reduction was needed when there looks
like there is enough space for the tower to be moved back, Mr. Peterson stated the compound
will be moved to be exclusively on the one property. In the design the fence line was followed in
terms of laying out the compound. It is about a 5 foot shift which will be made. In terms of
working with the landlord when locating one of these structures they try to locate it in a place
where it creates the least interference with the property. If the tower is moved 20 feet in any
direction out then you are moving it more into the property which puts it in the area of drive isle
of potential parking. By tucking the tower the proposed area allows them to preserve the
12
Page 13
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
landlord’s utility of the property while putting this structure in an area that is compatible with
what is existing.
Responding to Mr. Senato’s question whether one of the Verizon Company was private and the
other corporate, Mr. Peterson stated that they are the same entity.
Responding to Mr. Keller’s question whether the site will be on Clara Ridgley property LLC
parcels, because otherwise he did not have anything relating to the All Safe Mini Storage LLC.
Mr. Peterson concurred and stated that it was the same individual Mr. Henry Mast.
Responding to Mr. Keller’s question whether Mr. Henry Mast was present, Mr. Peterson stated
no.
Responding to Mr. Keller’s question whether Mr. Henry Mast was the manager of both LLC’s,
Mr. Peterson concurred.
Mr. Peterson stated that it was just an oversight in tracking the fence line, but there is no problem
in moving everything to ensure that this facility will be on one property (Clara Ridgley property).
There will be an access easement across the storage facility to get to the proposed facility.
Mr. Keller noted that with any proposed motion if it is advisable to require the site location as to
the one distinctive tax parcel number and ownership of Clara Ridgley to ensure that nothing arise
between possible approval today and ultimate siting through the next various steps that
apparently have to take place for Planning Office approvals.
Mr. Peterson stated that they were fine with Mr. Keller notation, however; Mrs. Townshend
indicated if for some reason it was not resolved they would have to give the Planning Office an
easement agreement allowing it to be there or make a lot line adjustment. He stated that they are
fine with however the Board of Adjustment and Staff wants to handle it. They will make the
slight shift to make sure everything is on one (1) property.
Chairman Sheth opened a public hearing and after seeing no one wishing to speak closed the
public hearing.
Chairman Sheth questioned if there was any additional correspondence for the record. There
was none.
Mr. Keller moved to approve application V-15-09 to include the two (2) notations made as to the
20 foot dimension from the property line and allowing for the additional 105 feet in height as to
the initial request, the siting of the requested facility shall be conducted solely on City of Dover
tax parcel number ED-05-076.08-01-01.00-000 Clara Ridgley Properties LLC, be it understood
that there would be access over other property to avail utilization of the new Verizon Wireless
facility, and based upon the testimony given, distributed exhibits, it is note that the placement of
the facility will be in keeping with surrounding mixed of commercial and industrial properties,
uses are in keeping with the permitted use of the IPM Zone as a public utility infrastructure, and
the understanding that subsequent proposed site development plans would be evaluated by the
13
Page 14
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
Planning Office and other agencies as required. Mr. Senato seconded the motion and
unanimously carried 5-0.
Colonel Ericson moved to amend the motion to include that the variance request allow a 20 foot
reduction, side yard setback to permit construction 20 feet from the property line and allow the
structure to exceed the maximum height of 20 feet to allow for an additional 105 feet in height,
the reason being because there were two measurements that was not made in the previous
motion.
Mr. Rodriquez clarified that the motion as presented was correct.
Colonel Ericson stated that he would take back the amendment.
OTHER BUSINESS
DISCUSSION
Responding to Mr. Hufnal’s inquiry to staff regarding the Board’s concerns and volume of
questions related to Industrial Park Zoning, and whether the Planning Office should look at the
statutes and regulations and consider revising them to current standards, rather than looking at
old ordinances that need to be updated. Should they be updated and should a joint meeting be
scheduled to discuss items that the Board of Adjustment has seen that need updating, or is it
something the Planning Office is already doing? Mrs. Townshend stated that the Planning Office
is in the process of updating the ordinances. Last summer the Commercial Zones were updated.
Staff is in the process of updating the industrial and manufacturing zones. The majority of the
language is already a work in progress. Hopefully, staff can bring something forward to City
Council later this year.
Responding to Mr. Hufnal’s question whether the process after revision would be approval from
City Council and then it would be adopted, Mrs. Townshend stated yes.
Responding to Mr. Hufnal’s question whether the Planning Office had all the data the necessary
data needed for the updates or if they needed Board of Adjustment input, Mrs. Townshend stated
that there are probably pieces that are not addressed, but would not be addressed in those specific
sections such as the signage issue which needs to be addressed in sign regulations. The Planning
Office plans to eliminate the Manufacturing Zone and rezone items that are currently zoned
Manufacturing to either C-3 (Service Commercial Zone) or IPM (Industrial Park Manufacturing
Zone) because the Manufacturing Zone is problematic.
Mr. Hufnal stated that we will get more applications regarding towers because of the expansion
of telecommunications and the businesses that are coming into Dover.
Mrs. Townshend stated that the office is using a 1999 code interpretation that deals with the
poles. Exclusive of the Industrial Zone staff needs to put together an ordinance that better
addresses cell towers, radio antennas, etc.
14
Page 15
CITY OF DOVER BOARD OF ADJUSTMENT JUNE 17, 2015
Mr. Senato stated that in the past Dover was named the tree city of the nation, but when you start
to get all the poles then you will have a lot of antenna poles around the city instead of trees.
Mr. Senato also stated that last year there were 14 applications that came before the Board of
Adjustment, one (1) Appeal dismissed, two (2) Appeals denied, and eleven (11) Approvals.
Chairman Sheth stated that the application process has improved and there are more qualified
applicants.
Responding to Mr. Senato’s question whether there was ever a time in the City when there is a
discussion of antenna poles on a form of limitation; Mrs. Townshend stated that there is some
literature available through the American Planning Association on how other locations have dealt
with the issue. As we work on an Ordinance we will need to look at the information that is
available because while we want to make sure the coverage is available and we are not too
restrictive, we also need to be conscious of the character of the community and locations.
Mr. Senato stated that it was a concern as he had counted all the poles and took a survey before
this meeting.
Chairman Sheth stated that the case was before the Board of Adjustment because the federal
government states one thing and the Ordinance states another. In order to keep the jurisdiction
the applicant must get the variance approved.
Mr. Senato stated that if it is a Christian radio station (tower) the federal government almost
oversees the City Zoning Ordinance.
Mrs. Townshend stated that any ordinance developed would need to be compliant with FCC
regulations.
Mr. Hufnal moved to adjourn the meeting, seconded by Mr. Senato and unanimously carried
5-0.
Meeting adjourned at 10:38 A.M.
Sincerely,
Maretta Savage-Purnell
Secretary
15