UTILITY COMMITTEE
AGENDA
DECEMBER 9, 2013 - 5:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate
times. When possible, please notify the City Clerk (736-7008 or e-mail at
CityClerk@dover.de.us) should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Service Agreement for the Natural Gas Distribution System in the Garrison Oak
Technical Park (GOTP) - Chesapeake Utilities Corporation
(Staff Recommends Authorizing the City Manager to Execute the Service Agreement with
Chesapeake Utilities Corporation)
2. TEA/NAES Report (October)
(Staff Recommends Acceptance of the Report)
3. Updates
A. Calpine Energy Center
(Committee Action Not Required)
B. Dover Sun Park
(Committee Action Not Required)
C. Garrison Oak Technical Park Project
(Committee Action Not Required)
4. Adjournment by 5:55 p.m.
/tm
S:\AGENDAS-MINUTES-PACKETS\Committee-Agendas\2013\12-09-2013 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
ACTION FORM
PROCEEDING: Utility Committee AGENDA ITEM NO.:
DEPARTMENT OF ORIGIN: City Manager’s Office DATE SUBMITTED: 12/02/2013
PREPARED BY: Scott D. Koenig, P.E., City Manager
SUBJECT: Service Agreement for the Natural Gas Distribution System in the Garrison Oak
Technical Park (GOTP) – Chesapeake Utilities Corporation
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: Controller
EXHIBITS: Copy of the Draft Service Agreement
EXPENDITURE REQUIRED: N/A AMOUNT BUDGETED: N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: As soon as possible.
RECOMMENDED ACTION: Recommend to City Council to authorize the City Manager to execute
the Service Agreement with Chesapeake Utilities Corporation for the Natural Gas Distribution
System within the Garrison Oak Technical Park (GOTP).
BACKGROUND AND ANALYSIS
The City of Dover is acting as the developer of the Garrison Oak Technical Park. As the developer,
we believe it will be advantageous to offer natural gas service to the various tenants in the industrial
park. Therefore, we have requested that natural gas infrastructure be installed within the technical
park so that it is available to potential purchasers and tenants. Attached is a standard service
agreement submitted by Chesapeake Utilities which outlines the respective responsibilities of the City
as well as Chesapeake Utilities.
All costs to install the required infrastructure will be the responsibility of Chesapeake Utilities
Corporation; however, the agreement includes a revenue shortfall calculation that the City of Dover
would be responsible for should the revenues from the investment not be equal to or in excess of the
initial capital investment within the first six (6) years after the effective date of the agreement. The
maximum financial exposure to the City of Dover is estimated to be less than $130,000.
Staff believes the provision of natural gas service throughout the Garrison Oak Technical Park will be
a benefit to current and future tenants and recommends approval of the agreement.
Page 3
Service Agreement for Natural Gas Distribution System
This Agreement (“Agreement”) is made and entered into as of the ___ day of ___________, 2013 by
and between The City of Dover, Delaware, a municipality of the State of Delaware (“Developer”)
whose address is 15 Loockerman Plaza, Dover, DE, and Chesapeake Utilities Corporation, a Delaware
corporation (“Company”) whose address is 350 South Queen Street, Dover, DE, 19904.
RECITALS
1. Developer expects to promote development of a community named Garrison Oak Technical
Park, consisting of, among other things, multiple commercial and industrial lots located in
Dover, Delaware (the “Project”).
2. Company desires to install a natural gas distribution system within the areas of the Project and
Developer has agreed to permit Company to install such a system within the Project pursuant to
the terms and conditions hereinafter set forth.
NOW, THEREFORE, in consideration of the mutual covenants set forth herein, and for other good and
valuable considerations, the receipt and sufficiency of which are hereby acknowledged, Company and
Developer hereby agree as follows.
1. Installation of Gas Distribution System. Company agrees to install a natural gas distribution
system within such portion of the Project, including all necessary distribution lines, meters and
ancillary facilities (collectively, the “Gas Distribution System”) necessary to provide natural
gas service to all commercial facilities built in the Project (not to include any facilities that
obtain natural gas delivery service from Eastern Shore Natural Gas Company). The location of
the gas lines and all related infrastructure and improvements relating to the Gas Distribution
System shall be subject to Developer’s express prior approval, which shall not be unreasonably
withheld or delayed. Developer has provided Company a subdivision plan relating to the
Project which is attached hereto as Exhibit A (reflecting lots, streets and easements), otherwise
referred to as the “Plat.” To the extent such Plat does not cover the entire Project, Developer
shall provide supplemental plat(s) to Company from time to time with respect to the remainder
of the Project and such supplemental plats shall be incorporated into Exhibit A.
Upon the completion of the installation of each portion of the Gas Distribution System,
Company expressly agrees to restore the real property in the Project upon and within which
such portion of the Gas Distribution System was installed to substantially the same condition
existing prior to commencement of the installation of such portion of the Gas Distribution
System.
2. Preparation for Installation and Easements. Developer agrees to provide adequate physical and
legal access to the Project including recorded, assignable easements and/or rights of way to all
Page 4
areas of the Project where any portion of the Gas Distribution System is to be installed.
Developer shall grant to Company such easements on Developer’s property as are reasonably
necessary for Company to construct and maintain the Gas Distribution System on or to the
Project, provided (i) if Company causes damage to the easement area during construction and
maintenance of the Gas Distribution System, Company agrees to restore the easement area so
damaged to substantially the same condition prior to said construction and maintenance; and,
(ii) the easements shall otherwise be in form and substance acceptable to Company. Developer
agrees to provide Company with plats of the Project that indicate the locations of the easements
and/or rights of way where portions of the Gas Distribution System are to be installed by
Company. Company shall have the right to make copies of such plats at Company’s sole cost
and expense.
Company shall bear all costs related to the construction of the Gas Distribution System.
Developer reserves the right to relocate any easement granted to Company if necessary for the
development of the Project in Developer’s determination, provided that the portion of the Gas
Distribution System subject to such revised easements has not yet been installed. If Developer
desires to modify any easement relating to any portion of the Gas Distribution System after
such system has been installed, then Developer must obtain Company’s advance written
consent to any easement modification and the Developer shall reimburse Company for any
design and other costs associated with any relocation of the Gas Distribution System
necessitated by such revised easements.
3. Coordination of Installation. Company agrees to cooperate with Developer with respect to the
construction of the Gas Distribution System so as not to interfere with or delay Developer’s
construction of any portion of the Project. In the event that Developer intends to construct the
Project in multiple phases (each a “Phase”), Developer shall advise Company from time to time
of its anticipated construction schedule for each Phase of the Project. Such schedule should
provide Company with sufficient time to construct the Gas Distribution System within the
various Phases of the Project.
4. Ownership of Gas Distribution System. The Gas Distribution System shall remain the exclusive
property of Company at all times during and following the expiration or earlier termination of
this Agreement. Company shall have the sole obligation and responsibility for the maintenance
of the Gas Distribution System. Company shall at all times maintain the Gas Distribution
System in accordance with the plans and specifications originally approved by all appropriate
governmental agencies. This obligation shall survive the termination of this Agreement and
shall inure to benefit all end-user consumers within the Project. Company hereby agrees to
indemnify, defend and hold harmless Developer and its officers, directors, employees,
successors and/or assigns from and against all third party claims, liabilities, suits, damages,
costs and expenses including, without limitations reasonable attorneys’ fees and court costs at
trial and all appellate level(s), arising from or in connection with construction, operation or
maintenance of the Gas Distribution System.
5. Gas Appliance Requirement. In recognition of the investment made by Company in
constructing the Gas Distribution System, Developer agrees that all of the units to be
Page 5
constructed in the Project by Developer (or any builder approved by the Developer) shall make
all possible efforts to utilize natural gas for heating purposes. Developer shall inform each
Builder within the Project of the need to install natural gas appliances in compliance with the
requirements of the preceding sentence.
Developer agrees that interior gas piping, venting, etc., installed in all of the units constructed
within the Project will conform to applicable codes and will be so sized as to satisfy existing
requirements for the ultimate utilization of natural gas.
Developer further agrees to make a reasonable effort to utilize natural gas in common areas of
the Project.
6. Revenue Shortfall. Upon the completion of the sixth year anniversary of the effective date of
this Agreement, should the sum of the Projects net revenue (based on the Company’s rates in
effect from time to time and as approved by the Delaware Public Service Commission) from
the delivery of natural gas by the Company to each facility located within the Project fall short
of the investment required for the project, currently estimated at one hundred thirty thousand
dollars ($130,000), then Developer will pay the Company the amount of the shortfall. The
Projects net revenues exclude revenues from the Gas Sales Service Rate (GSR) and taxes. The
shortfall will be calculated consistent with the six times (6X) net revenue test on file with the
Public Service Commission and will include a gross-up for taxes. Developer will pay any
shortfall amount within thirty (30) days from the time the Company gives notice that such
shortfall has occurred. An example of the calculation to be used in calculating any revenue
shortfall is attached hereto as Exhibit B.
7. Assignment. If Developer desires to convey to other builders or developers any or all of the
land upon which the Project is to be developed, Developer shall provide the Company with
written notice of said intent a minimum of thirty (30) days prior to any conveyance.
Notwithstanding any such conveyance Developer shall remain liable to Company under this
Agreement, including any payment required for any revenue shortfall, as defined in Section 6
above.
8. Sole Agreement. This Agreement supersedes any and all other agreements, either oral or in
writing, between the parties hereto with respect to the subject matter hereof and contains all of
the covenants, agreements and other obligations between the parties with respect to the subject
matter hereof. There are no collateral agreements, promises or undertakings whatsoever by
either party hereto which in any way touches upon the subject of this Agreement.
9. Binding Agreement. This Agreement shall be binding upon, and shall inure to the benefit of,
the parties hereto, and their respective successors and assigns, and no assignment shall relieve
either party of such party’s obligations hereunder without written consent of the other party,
except as otherwise provided herein.
10. Notices. All notices, requests, approvals, demands, and other communications required or
permitted to be given under this Agreement shall be in writing and shall be sent by hand
Page 6
delivery or certified U. S. Mail, return receipt requested, postage prepaid. Any such
communication shall be deemed to have been given and shall be effective upon delivery in the
case of hand delivery and three (3) business days after being deposited in the United States mail
in the case of mail delivery. Communications shall be addressed in accordance with the first
paragraph hereof, or at such other address, as the party to whom the communication is sent
shall have designated hereafter in accordance with the provisions of this paragraph.
IN WITNESS WHEREOF, the parties hereto have caused this Service Agreement for Natural Gas
Distribution System to be signed by their respective duly authorized personnel as of the date first
above written.
CHESAPEAKE UTILITIES CORPORATION – DELAWARE DIVISION
By: _________________________________
Name: Jeffrey R. Tietbohl
Title: Vice President
City of Dover
By: _________________________________
Name: _______________________________
Title: ________________________________
Page 9
EXHIBIT B – Example of Revenue Shortfall Calculation under Paragraph 6.
Actual Capital cost = $130,000
Actual Net Revenues*
Year 1 $5,000
Year 2 $10,000
Year 3 $15,000
Year 4 $20,000
Year 5 $30,000
Year 6 $35,000
Total $115,000
Shortfall payment due = $130,000 - $115,000 = $15,000 plus gross-up for taxes
*Net revenues are total revenues less revenue from the Gas Sales Service Rate (GSR) and taxes.
Page 10
The Energy Authority, Inc.
Monthly Management Committee Update – October 2013
November 21, 2013
Prepared by:
Robert Trinnear
Client Services Manager
904.360.1309
rtrinnear@teainc.org
Page 11
TABLE OF CONTENTS
I. Executive Summary 1
II. Budget Report 12
III. Operations Management 15
IV. Appendix 29
i
Page 12
I. Executive Summary
A. Power Supply Summary:
Overall Power Supply costs were $324,485 over budget due to higher reactive services
costs.
Dover’s budgeted cost for all power supply (capacity AND energy) was $82.00/MWh.
The actual cost of all power supply (capacity AND energy) was $86.92/MWh.
The cost of energy alone was $48.11/MWh, versus a budgeted energy cost of $49.33.
Dover’s hedge purchases totaled 44,560 MWh, which was 76% of the actual load. The
budgeted hedge purchase totaled 33,280, which was 57% of the budgeted load.
Dover’s power purchases from hedge transactions totaled $2,225,782. Purchases from
PJM (energy and fees) totaled $1,239,043 with DA Energy purchases totaling $386,659
and Reactive Services Charges totaling $377,806.
Dover’s total load was 58,343 MWh versus a forecasted load of 57,888 MWh.
Dover’s planned energy purchase from the SunPark solar installation was 1,294 MWh.
Dover’s actual energy purchase from the SunPark installation was 1,180 MWh.
1
Page 13
Supply Source Summary:
Supply Variance:
Budget Actual Variance
Gross Load 57,888 58,343 (455)
Wholesale Load 56,594 57,163 (569)
Hedged Volume (MWh) 33,280 44,560 (11,280)
Unhedged Volume (MWh) 23,314 12,603 10,711
Dover SunPark Volume (MWh) 1,294 1,180 114
Renewable Energy Credits Volume 194 300 (106)
Hedged Cost ($/MWh) $ 55.50 $ 49.95 $ 5.55
Unhedged Energy Cost ($/MWh) $ 38 $ 37 $ 2
Solar Energy Cost ($/MWh) $ 87 $ 102 $ (15)
Energy Costs ($/MWh) $49.33 $48.11 $1.22
All-in Costs - Energy, Capacity and RECs ($/MWh) $82.00 $86.92 ($4.92)
2
Page 14
B. Generation Summary:
Dover generated 0 MWh in the month. Net generation revenue was $872,401 vs. a
budget of $973,657. This delta was mainly due to higher plant O&M during the month.
3
Page 15
Generation Breakdown:
City of Dover's Wholesale Generation
Net Generation Mwh 0.00
All In Generation Margin
PJM - Economic and reliability dispatch (GEN) $ -
PJM - Generation Capacity Credit (GEN) $ 1,329,125.00
PJM - Black Start & Transmission Losses (GEN) $ 50,818.18
Gas Purchases $ -
Oil Purchases $ -
Transport / Cash Out $ -
Gross Margin $ 1,379,943.18
Production Margin
PJM - Economic and reliability dispatch (GEN) $ -
Gas Purchases $ -
Oil Purchases $ -
Transport / Cash Out $ -
Gross Production Margin $ -
$/Mwh All In Generation Margin $ -
$/Mwh Generation Production Margin $ -
4
Page 16
C. Emissions Summary:
Emissions Allowance Summary through November 15, 2013
(Includes Nov15, 2011 sale of Seasonal NOx to DEMEC)
CAIR EMISSION ALLOWANCE SUMMARY
SO2 NOx Allowances1
Date Action
Allowances Seasonal Annual
1/1/09 2008 Carryover 3,240 0 0
1/1/09 2009 Allocation 2,723 53 80
2/1/10 2010 Allocation 2,039 50 78
1/1/11 2011 Allocation 1,988 49 78
4/1/11 2011 Reallocation 2 4
1/11/12 2012 Allocation 1,988 51 80
10/4/2012 2013 Allocation 1,988 49 76
9/29/09 SO2 Sales (1,500)
11/12/09 NOx Ann. Sales (45)
11/13/09 SO2 Sales (1,410)
11/20/09 NOx Seas. Sales (25)
12/31/09 2009 Emissions2 (1) (6) (13)
12/31/10 2010 Emissions 0 (54) (54)
10/31/10 EPA Linearity Testing Req. (68) (68)
2011 2010 Deficit NOx Purchases 53 22
Aug 2011 Revised 2010 ECMPS data 30 30
Nov 2011 NOx Seas. Sales (DEMEC) (1)
12/31/11 2011 Emissions2 (1) (32) (36)
12/31/12 2012 Emissions2 (1) (37) (37)
Nov 2012 NOx Seas. Sales (DEMEC) (2)
2/13/2013 NOx Annual. Sales (DEMEC) (3)
10/31/13 C.Y.T.D. 2013 Emissions 0 (20) (20)
11/15/13 NOx Seas. Sales (DEMEC) (5)
REMAINING ALLOWANCES 11,053 50 174
On August 21, 2012, a three-judge panel of the U.S. District Court of Appeals (DCA) in
Washington vacated EPA’s Cross State Air Pollution Rule (CSAPR) which would have
become effective on January 1, 2012. The DCA instructed EPA to continue
administering the Clean Air Interstate Rule (CAIR). EPA has appealed this ruling to the
U.S. Supreme Court, and the Court has agreed to review the DCA opinion. A ruling is
not expected before June, 2014.
1
Per CAIR, starting in 2009, NOx emissions are governed by a seasonal and annual program.
2
Under CAIR, pre-CAIR SO2 allowances are retired at a rate of 2 allowances for each ton emitted. It is
assumed that pre-CAIR allowances will be retired before CAIR allowances.
5
Page 17
Market liquidity for CAIR allowances continues to be low, with few transactions
occurring. The following table shows estimated values for Dover’s banked allowances,
based on broker bids & offers:
Mark-to-Market for CAIR Allowances (11/18/2013)
Commodity $/Ton Tons Extended
(Bid/Offer Avg.) Value
SO2 Allowances (2009 & earlier) $ 1.38 5,089 $ 7,023
SO2 Allowances (2010-13) $ 0.68 5,964 4,056
NOx Allowances - Seasonal $18.00 50 900
NOx Allowances - Annual $40.00 174 6,960
TOTAL $18,939
Regional Greenhouse Gas Initiative
The State of Delaware is a participant in the Regional Greenhouse Gas Initiative (RGGI).
The City of Dover must comply with RGGI by surrendering carbon dioxide (CO2)
allowances pursuant to the State of Delaware’s laws (Title 7, Chapter 60, Sub-Title II-A).
Delaware has elected a combined emissions allowance allocation/auction mechanism for
RGGI, in which 40% of CO2 allowances were allocated to sources for 2009, declining by
8% per year so that by 2014, all CO2 allowances are auctioned.
Dover had more than a sufficient number of RGGI allowances allocated to it to cover its
requirements through the first compliance period (calendar years 2009-2011). Any
unused allowances are carried over (“banked”) for subsequent years. The table below
shows RGGI allowance allocations, deductions and the cumulative balance by year
(column 8).
CO2 Allowance Summary (10/31/2013)
1 2 3 4 5 6 7 8
CO2 Allowances
Available Annual
CO2 CO2 (Per Facility, Allocated Cumulative
CO2 Tons CO2
Allowance Allowances Prior to Sale) CO2
Vintage Sold YTD Allowances
Emitted Allowance Balance
McKee Balance
VanSant
Run
2009 0 60,128 2,056 62,184 (5,796) 56,388 56,388
2010 0 48,102 1,645 49,747 (32,971) 16,776 73,164
2011 0 36,077 1,234 37,311 (17,763) 19,548 92,712
6
Page 18
2012 0 27,058 925 27,983 ( 15,265) 11,793 104,505
2013 YTD 0 15,032 514 15,546 (8,726) 6,820 111,325
After 2013, Dover will no longer receive allocations of RGGI allowances. The
Cumulative Balance (column 8) – aka “Banked Allowances”) can be utilized for
generation in future years (including 2013). Once the banked allowances have been fully
utilized, Dover will be required to purchase RGGI allowances through the auctions or
through over-the-counter markets. Assuming that Dover does not sell any banked
allowances, it will be able to maintain a positive balance through 2016–2025, depending
on actual annual energy production in 2012 and beyond.
On February 7, 2013, RGGI proposed changes to its Model Rule. The proposed changes
have been included in previous monthly reports. With the release of the Updated Model
Rule, the RGGI states now plan to revise their CO2 Budget Trading Programs through
their individual state-specific statutory and regulatory processes. Each RGGI state seeks
to complete their state specific processes such that the proposed changes to the program
would take effect on January 1, 2014. The Delaware Department of Natural Resources
expects to publish a draft rule in the Delaware Register in the near future.
Dover could elect to sell all or a portion of its banked allowances now and re-acquire
allowances at a later date; however TEA is currently of the opinion that Dover will be
better off retaining its banked allowances for use during future compliance years.
The most recent RGGI auction occurred on September 5, 2013; the auction cleared at
$2.67/ton. The next auction will occur on December 4, 2013. RGGI futures settlement
prices posted on Intercontinental Exchange (ICE) on November 18, 2013 ranged from
$2.95 to $3.25/ton, depending settlement month. Based on the average Intercontinental
Exchange prices for December 2013 settlement ($2.95/ton), the value of Dover’s
existing 111,325 ton RGGI allowance bank is approximately $328,409.
Renewable Energy Certificates
Dover owns two photovoltaic systems totaling 15 kW, consisting of (one 5 kW unit at the
Utilities Administration Building and two 5 kW units at the McKee Run generating
station. Dover also receives solar energy produced by the 10 MW Dover Sun Park which
is owned by White Oak Solar Energy, LLC. In addition to the all of the physical energy
produced by the Sun Park, Dover receives 15% of Sun Park’s SRECS. Through the end
of September 2013, Dover has accumulated a total of 6,310 SRECS from these renewable
energy resources.
The nearest viable market for Dover’s SRECs is Pennsylvania. Pennsylvania’s September
2013 SREC auction cleared separately for 2010/2011 through 2013/2014 vintage
allowances. Clearing prices and Dover’s SREC market value estimate are shown in the
table below.
7
Page 19
SREC Vintage
Auction Clearing Price SREC Quantity Market Value
(June 1 – May 31)
$ 4.01 13
2010/2011 $ 52
(Aug-13 Auction)
20011/2012 $ 8.21 2,375 19,499
2012/2013 $11.01 2,725 30,002
2013/2014 $14.00 1,197 16,758
TOTAL 6,310 $66,311
TEA continues to recommend to Dover to retain these allowances for compliance with its
Renewable Portfolio Standard which DEMEC is working on. Once Dover has an
approved RPS in place, it may be required to retire a portion of its current SREC balance
for compliance in the 2012/13 future compliance year. Any remaining SRECs could be
used for the 2013/14 compliance year.
NOTE: SRECs in both Delaware and Pennsylvania expire without value after 3 years.
Dover currently has thirteen (13) 2010/2011. Based on a recent discussion with DEMEC
staff, this expiration provision is not likely to be of concern within the current compliance
year.
If Dover has not accumulated adequate non-solar RECs, it will need to acquire some
from DEMEC for the 2013/2014 compliance year. DEMEC has told TEA that it will
likely have sufficient non-solar RECs for Dover’s requirements. Dover can purchase and
retire a portion of these non-solar RECs during the current compliance and fiscal years,
or it can defer acquisition until the June – August, 2014 time frame, after the exact
amount of non-solar REC requirements is known.
8
Page 20
D. Operations Management Summary:
During the month of October, there were no restricted work days or lost time accidents.
On October 14, 2013, the plant successfully completed three years without and OSHA
Recordable Accident or a Lost Time Reportable Accident. The facility has now gone
three years and 15 days (1,110 days) through October 31, 2013 without an OSHA
Recordable Accident or a Lost Time reportable accident.
In the month of October, there were no MW’s generated.
Monthly Budget Variance – The actual expenses attributable to O&M of the two sites for
the month of September were $507,542 against a budgeted amount of $391,048 for an
unfavorable variance of $116,494 or 29.79%. The principal reason for the unfavorable
variance was due to 3 payroll periods in October rather than the 2 that had been budgeted.
E. Risk Management Summary:
Forward power prices in PJM are lower than last month.
The current projected cost of service is below:
Blended Monthly
Cost Change
Power Year Hedge Ratio ($/MWh) ($/MWh)
2013-14 76% $ 48.82 $ (0.22)
2014-15 49% $ 43.46 $ (0.62)
2015-16 23% $ 40.97 $ (1.00)
9
Page 21
II. Budget Report
Variance Report:
Budget Actual Variance
Oct-13 Oct-13
Gross Load 57,888 58,343 (455)
Power Supply
Hedged Energy $1,847,150 $2,225,782 ($378,632)
PJM - Energy, Congestion & Losses $895,844 460,428 $435,416
PJM - ARR, Transmission and Fees $395,000 774,874 ($379,874)
Dover SUN Park Energy $112,621 $120,840 ($8,218)
Dover SUN Park RECs $25,000 $42,894 ($17,894)
Management Fees $83,000 $83,000 $0
PJM - Capacity UCAP Obligated Purchased $1,388,224 $1,363,506 $24,717
Subtotal - Power Supply $4,746,839 $5,071,324 ($324,485)
Power Generation O&M
Plant O&M 391,048.00 $507,542 (116,494.00)
Subtotal Generation O&M 391,048.00 507,542.00 ($116,494)
Power Generation Production Margin
PJM - Economic and reliability dispatch $0 $ - $0
Fixed Fuel and Transport Charges $0 $ - $0
Subtotal Generation Production Margin $0 $ - $0
Power Generation Non-Production Revenue
PJM - Generation Capacity Credit ($1,329,125) $ (1,329,125.00) $0
Emissions Allowance Sales $0 $ - $0
PJM - Black Start & Transmission Losses ($35,580) $ (50,818.18) $15,238
Subtotal - Non-Production Revenue ($1,364,705) ($1,379,943) $15,238
SubTotal - All Generation (973,657.00) ($872,401) ($101,256)
Total - Utilities Cost $3,773,182 $4,198,923 ($425,741)
Unit Costs
Total - Power Supply $82.00 $86.92 ($4.92)
Total - Power Generation ($16.82) ($14.95) ($1.87)
Final Cost of Service to City of Dover Ratepayers $65.18 $71.97 ($6.79)
10
Page 22
Variance Analysis:
Power Supply
Dover consumed 455 MWh more than forecast for the month.
PJM energy costs were lower than expected as less market purchases were
required. Hedged costs were higher than forecasted due to an additional layering
in of hedges. PJM Fees were well above budget, driven by large reactive services
charges.
The result of the higher overall cost for reactive services was a net power supply
cost of $86.92/MWh, $4.92/MWh higher than budget.
For the month, the city realized an unfavorable variance of $324,485 for power
supply vs. the monthly budget.
Dover Sun Park generated 114 MWh less than forecast.
Generation
Power generation had an unfavorable budget variance of $101,256.
Plant O&M expenses had an unfavorable budget variance of $116,494 for the
month.
11
Page 23
YTD Variance Report:
Budget Actual Variance
YTD YTD
Gross Load 275,677 274,895 782
Power Supply
Hedged Energy $11,193,694 $11,768,406 ($574,712)
PJM - Energy, Congestion & Losses $3,525,909 $3,123,948 $401,961
PJM - ARR, Transmission and Fees $1,580,000 $2,617,557 ($1,037,557)
Dover SUN Park Energy $543,246 $689,486 ($146,241)
Dover SUN Park RECs $100,000 $167,824 ($67,824)
Management Fees $332,000 $332,000 $0
PJM - Capacity UCAP Obligated Purchased $5,508,114 $5,409,985 $98,128
Subtotal - Power Supply $22,782,962 $24,109,207 ($1,424,373)
Power Generation O&M
Plant O&M $1,970,066 $2,032,174 ($62,108)
Subtotal Generation O&M $1,970,066 $2,032,174 ($62,108)
Power Generation Production Margin
PJM - Economic and reliability dispatch ($230,472) ($1,742,146) $1,511,674
Fixed Fuel and Transport Charges $0 $831,570 ($831,570)
Subtotal Generation Production Margin ($230,472) ($910,575) $680,104
Power Generation Non-Production Revenue
PJM - Generation Capacity Credit ($5,273,625) ($5,273,625) $0
Emissions Allowance Sales $0 $0 $0
PJM - Black Start & Transmission Losses ($142,320) ($352,331) $210,011
Subtotal - Non-Production Revenue ($5,415,945) ($5,625,956) $210,011
SubTotal - All Generation ($3,676,351) ($4,504,358) $828,007
Total - Utilities Cost $19,106,612 $19,604,849 ($498,238)
Unit Costs
Total - Power Supply $82.64 $87.70 ($5.06)
Total - Power Generation ($13.34) ($16.39) $3.05
Final Cost of Service to City of Dover Ratepayers $69.31 $71.32 ($2.01)
12
Page 24
III. Operations Management
NAES Corporation
Dover, Delaware
October 2013
Monthly Report
New Decking over Unit 3 Cooling Tower Hot Water Basin
13
Page 25
Table of Contents
1.0 Environmental, Health, and Safety
2.0 Financial
3.0 Operations
4.0 Maintenance
5.0 CIP
6.0 General Plant Information
7.0 Summary of NAES Performance
14
Page 26
1.0 Environmental, Health and Safety:
During the month of October, there were no restricted work days or lost time accidents. On
October 14, 2013, the plant successfully completed three years without and OSHA
Recordable Accident or a Lost Time Reportable Accident. The facility has now gone three
years and 15 days (1,110 days) through October 31, 2013 without an OSHA Recordable
Accident or a Lost Time reportable accident.
The October (September discharge) DMR was submitted for the McKee Run site with no
NPDES exceedences although it did have high Arsenic levels. There were no opacity
deviations during the month. During the month of October, NAES staff submitted a request
to Kent County requesting modification of the Industrial Wastewater discharge permit in
order to increase the loading level for Arsenic as well as the maximum allowable monthly
discharge. In response, Kent County has issued a revised permit for the McKee Run site with
the requested levels.
The Plant Safety training requirements for OSHA/Safety and Environmental Programs has
now been completed by all staff members. The training program includes the inclusion of the
General Physics on-line training system as well as plant safety procedures and policies.
Safety Procedures and associated quizzes have been updated. Staff has retrained on each one
to ensure they understand what changes have been made, if any, to the programs.
Plant staff and NAES Environmental Support Services worked with the emissions monitoring
equipment services provider to resolve DAHS data issues encountered during Appendix E
testing on Unit 11 and Unit 2. During the stack testing, inaccurate fuel flow data was
encountered due to a poor wire connection on a CEMS terminal board on Unit 11 and a bad
PLC Card (Channel) was found to be problem on Unit 2. The Emission Test Reports were
finalized and submitted to EPA/DNREC. Third quarter 2013 EDRs were also submitted to
the EPA/DNREC.
Environmental, Health, and Safety Statistics
Month Fiscal Year to Date
(October) (7/1/13-6/30/14)
NOVs 0 0
Opacity Deviations 0 0
Environmental Deviations 1 3
OSHA Recordable 0 0
OSHA LTA's 0 0
First Aid cases 0 0
Restricted Workday Accident 0 0
Near Miss 0 2
Man Hours Worked 4393.50 17146.25
Date last OSHA Recordable 10/14/10
Date last Lost Time Accident 10/14/10
Days since last OSHA recordable 1,110
Days since last Lost Time Accident 1,110
15
Page 27
Emissions (NOx & SO2) All data thru 10/31/13
NOx Summary – Ozone Season (May-Sep) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2010 0.7 2.2 88.7 3.3 94.7
2011 1.8 1.5 31.4 1.4 36.1
2012 1.2 1.0 35.8 1.0 33.1
2013 1.1 1.7 19.3 1.3 23.4
NOx Summary - Year (Jan-Dec) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2010 0.7 2.2 88.7 3.3 94.7
2011 1.8 1.5 32.6 2.9 38.8
2012 1.2 1.1 35.8 1.0 36.9
2013 1.1 1.7 19.4 1.3 23.5
SO2 Summary - Year (Jan-Dec) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2010 0.0 0.0 0.3 0.0 0.3
2011 0.0 0.0 0.1 0.5 0.6
2012 0.0 0.0 0.0 0.1 0.1
2013 0.0 0.0 0.0 0.2 0.2
CO2 Allowances Summary
CO2 CO2 CO2 Allowances Available Total CO2 CO2
Allowance Allowances (Per Facility, Prior to Tons Emitted Allowance
Vintage Sold YTD Sale) Balance
McKee Run VanSant
2009 0 60,128 2,056 5,796 56,388
2010 0 48,102 1,645 32,971 16,776
2011 0 36,077 1,234 17,763 19,548
2012 0 27,058 925 15,265 11,793
2013 0 15,032 514 8,726 6,820
Total CO2 Allowance Balance 111,325
*Note: CO2 allowance values are provided by the RGGI CO2 Allowance Tracking System.
Note: All emissions (NOx, SO2 and CO2) totals for 2013 are unofficial.
16
Page 28
CAIR NOx Allowances Summary*
NOx Allowances
CAIR CAIR NOx Available Total NOx NOx Allowance Balance
CAIR NOx
NOx Allowances (Per Facility, Prior to Tons Emitted
Allowances
Allowance Sold YTD Sale) (Yr/ Season)
Purchased
Vintage McKee McKee
VanSant YTD VanSant
Run McKee Run - Run
(Yr/Season) (Yr/Season)
(Yr/Season) VanSant (Yr/Season)
2010 and
3*** 27/0 0/2
earlier
2011 0 77/48 5/3 33/31– 3/1 0/0 - 0/0 42/10 2/2
2012 2** 75/46 5/3 36/36 – 1/1 0/0 - 0/0 39/10 2/0
2013 0 77/48 5/3 19/19 – 1/1 0/0 - 0/0 58/29 4/2
Total NOx Allowance Balance 166/49 8/6
*Note – Emissions allowances are deducted according to oldest vintage first or unless otherwise directed.
**Note – The facility transferred Ozone Season allowances to a third party.
***Note- The facility transferred Annual allowances to a third party
SO2 Allowances Summary
SO2 Allowances
Total SO2 Tons
Available Total SO2 Tons
Emitted –
(Per Unit, Prior Emitted – SO2 Allowances
SO2 Allowance SO2 Allowances U3 and U11
to Sale & U3 and U11 Balance
Vintage Sold - YTD YTD
Reconciliation) YTD
Unit #3 Unit #11
2010 and earlier 0 4815 276 0 5089
2011 0 1850 138 1 1988*
2012 0 1850 138 1 1988*
2013 0 1850 138 0 1988*
Total SO2 Allowance Balance 11,053
Note – Emissions allowances are deducted according to oldest vintage first, unless otherwise directed.
17
Page 29
2.0 Financial
Financial – Current Month
Month – October
Actual Budget Variance
Personnel 333,598 246,170 (87,428)
Materials & Supplies 27,965 7,785 (20,180)
Administrative Expenses 145,889 138,093 (7,796)
Total $507,452 392,048 ($115,404)
Financial – Fiscal Year to Date
Number of Months – 4
Actual Budget Variance
Personnel 994,446 989,515 (4,931)
Materials & Supplies 83,112 126,790 43,678
Administrative Expenses 774,652 854,586 79,935
Total $ 1,852,210 $1,970,891 $118,681
2.1 Variance analysis:
The expenses for October are $507,452 against a budgeted amount of $392,048 for an
unfavorable variance of $115,404 or 29.44%. The variance was due to the following:
PERSONNEL EXPENSES – An unfavorable monthly variance of $87,428 was due to
having three (3) payroll periods expensed in this month that had been budgeted for in
November. This includes straight time labor, overtime labor, and labor burden costs for
October.
MATERIALS AND SUPPLIES EXPENSES- An unfavorable monthly variance of
$20,180 was due to higher water usage than expected and the purchase of water treatment
chemicals that were a result of unplanned PJM dispatches for this time of year. The
increase in PJM dispatches were due to higher than normal ambient temperatures and
several large generating plants on the grid starting their outages in September. As a
result, the Dover units were dispatched/operated more to support the reduction in
available generation.
ADMINISTRATIVE EXPENSES – An unfavorable monthly variance of $7,796 was
due to higher insurance account costs and higher than budgeted electricity costs
experienced in order to support unit operations. The insurance costs were for the
environmental liability portion of the site insurance that was included in the budget for
July.
The forecasted expenses for this fiscal year are $5,966,244 expensed versus an approved
budget of $6,015,800 thereby realizing a 99.18 % expenditure rate.
18
Page 30
3.0 Operations
Unit Operations / Outages / Trips
In the month of October no units were dispatched. Units 1, 2, 3, and 11 started the fall
2013 outage on October 1 at 0700 hours.
Month October 2013
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0.0 0.0 0.0 0.0 0.0 0.0
Starts # 0 0 0 0 0 0
Gross Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Net Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Total Auxiliaries MWh 26.073 26.073 118.740 170.886 0.102 170.988
Auxiliaries purchased MWh 26.073 26.073 118.740 170.886 0.102 170.988
Fuel Gas Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 0.0 0.0
Total Fuel MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Net Heat Rate BTU/KWh 0.0 0.0 0.0 0.0 0.0 0.0
Unit Trips # 0.0 0.0 0.0 0.0 0.0 0.0
Capacity Factor % 0.0 0.0 0.0 0.0 0.0 0.0
Availability Factor % 0.94 0.94 0.94 0.94 0.94 0.94
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 737.000 737.000 737.000 2,211.000 593.000 2,948.000
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Reserve Shutdown
Hours 7.00 7.00 7.00 21.000 7.00 28.000
Hours
HW Boiler Gas Usage MMBTU 0.0 0.0
Pilot Gas Usage MMBTU 0.0 0.0 0.0 0.0
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from fuel flow
instruments.
19
Page 31
2013-2014 Fiscal Year-to-Date - October
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 74.765 170.316 183.196 428.277 51.476 479.753
Starts # 2 4 13 19 14 33
Gross Generation MWh 585.171 1,106.123 12,576.985 14,268.280 1,569.051 15,837.330
Net Generation MWh 545.470 1,024.415 11,585.303 13,155.190 1,567.790 14,722.980
Total Auxiliaries MWh 134.754 176.761 1,672.188 1983.703 4.362 1988.065
Auxiliaries purchased MWh 137.676 180.206 680.506 998.388 3.101 1001.489
Fuel Gas Used MMBTU 7,061.376 13,801.068 132,465.224 153,327.670 18,981.931 172,309.60
Fuel Oil Used MMBTU 1,642.633 1,671.506 0.0 3,314.14 2,937.660 6,251.80
Fuel Oil Used Gallons 11,568 11,726 0.0 23,294 20,795 44,089
Total Fuel MMBTU 8,704.009 15,472.574 132,465.224 156,641.81 21,919.591 178,561.40
Net Heat Rate BTU/KWh 15.778 14.477 11.558 13.938 13.838 13.888
Unit Trips # 0 1 0 1 4 5
Capacity Factor % 1.09 2.04 3.85 3.28 1.36 2.85
Availability Factor % 72.32 75.03 75.03 74.03 75.03 74.36
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 737.000 737.000 737.000 2,211.000 737.000 2,948.000
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 80.000 0.0 0.0 80.000 0.0 80.000
Reserve Shutdown
Hours 2,060.235 2,044.684 2,034.400 6,139.32 2,163.524 8,302.84
Hours
HW Boiler Gas Usage MMBTU 0.0 0.0
Pilot Gas Usage MMBTU 1,473.105 3,733.607 5,206.712 5,206.712
Fuel Oil Inventory
Monthly Monthly Fuel Monthly FY 13-14 Fuel FY 13-14
Inventory Inventory Purchases Inventory Inventory Purchases Inventory
(Start) (End) (Month) (Change) (Start) (YTD) (Change)
McKee Run
(#2 Fuel Oil) 430,931 428,288 0 (2,,643) 454,725 0 (26,437)
VanSant
125,064 124,390 0 (674) 146,133 0 (21,743)
(#2 Fuel Oil)
Note: As measured by tank level instruments. Tank levels may change due to oil temperature.
VanSant Lifetime through October 2013
Actual Starts Factored Starts Fired Hours
VanSant 1328 2,291.75 4,479.60
Since HGP - Dec 2004 246 624.05 896.02
20
Page 32
Team Report:
The Operations staff continues to support maintenance activities during the planned
outage by serving as Confined Space Attendants for confined space areas as well as other
support tasks. They assisted in the natural gas line purge on Unit 3 in preparation of the
installation of the pipe blank and in the purge on Units 1 and 2 gas lines. The Operations
staff has also supported the outage by performing various LO/TO tasks needed to test or
place equipment in or out or service.
Operations personnel continue to support maintenance by working on Preventative
Maintenance (PM) work orders and other work orders that they have the necessary skills
to successfully complete the task. The Operations Department continues to utilize the
Day Shift Workers in both Operations and Maintenance areas to help in maintaining the
plant.
Capacity Testing – FY 2013-2014
Summer 2013 (June 1- Aug 31) Winter 2013-2014 (Dec 1- Feb 28)
Unit Rated Net Reported Net Unit Rated Net Reported Net
Capability (MW) Capability (MW) Capability (MW) Capability (MW)
1 17 17.2 1 17* 0.0
2 17 17.8 2 17* 0.0
3 102 103.0 3 102* 0.0
VanSant# 39 40.9 11 39* 0.0
Total 175 178.9 Total 175 0.0
Note: * Denotes Unit is qualified for the PJM Winter Demonstration Period Exemption Program and
data has been submitted into the PJM eGADS
Note: # Depicts Net Corrected Capacity for Ambient Air Conditions – VanSant Unit only
21
Page 33
4.0 Maintenance
During the month of October, the Plant Maintenance staff continued addressing the
backlog of work orders and preparing for outage activities. There were thirty-seven work
orders issued with seventy-five work orders being completed during the month. There
were no safety work orders entered into the plant’s Computerized Maintenance
Management System (MP2) during the month. The table below summarizes the monthly
work order activities.
Work Order Report
October - 2013
Outstanding
From Outstanding
Previous Issued This Completed at the end of
Priority # Month Month This Month the month
1 16 1 10 7
2 52 6 21 37
3 40 2 0 42
4 6 0 0 6
5 24 2 7 19
SW1 0 0 0 0
SW2 0 0 0 0
SW3 0 0 0 0
SW4 0 0 0 0
SW5 0 0 0 0
PM 56 26 37 45
Totals 194 37 75 156
Note: PM Work Orders are included in the priority totals
Notable activities during the month include:
The NAES Maintenance Staff completed the change out of the fuel oil nozzles and fuel
oil check valves on Unit 11 at VanSant Generating Station. The nozzles and check valves
were changed out to correct high exhaust temperature spread issues when combusting #2
fuel oil. No spread issues were encountered when operating on natural gas. Also replaced
on the turbine were two wheelspace thermocouples that staff had been getting bad
readings while the unit was operating. They will be checked for proper operation the next
time the unit operates.
Annual inspection of Units 1, 2 and 3 Boilers were completed by Charlie Newman, boiler
inspector for XL Insurance, Joe Hultberg, plant Chemical vendor representative and plant
staff. They inspected the mud drums, steam drums and inside the fire box of the boilers.
Minor issues were found that will be addressed when performed dry layup of the boilers
and care of the boilers during the run season.
The NAES Maintenance and IC&E staff changed out several worn parts on the Unit 1
throttle valve. Staff had encountered problems with the valve earlier this year and had
22
Page 34
made temporary repairs until new parts were received. After the new parts were
installed, the valve was thoroughly tested for proper operation and then placed back into
service.
Third party contractor completed the replacement of decking over the Unit 3 Cooling
Tower Hot Water Basin during October. The decking was spongy and was badly in need
of replacement.
5.0 Capital Improvement Projects (CIP)
Project
Description Update
Number
Progress: Work is complete 99%.
MR Industrial Waste
EG1214 Schedule: Project to be complete in November, 2013 with the final
water System
revision of Standard Operating Procedures on the system.
Unit #3 Cooling Progress: Work is 100% complete
EG1402
Tower Repairs Schedule: Work is 100% complete excepting closeout in HTE.
McKee Run Progress: Work planned for the Fall is 75%
Auxiliary Schedule: Some work activities will be completed in the Fall Outage
EG1404
Component and others will be completed in the Spring Outage. Planning is
Replacement ongoing for the spring activities.
VanSant Station Progress: Work planned for the Fall is 85% complete.
EG1405 Component Schedule: Planning activities are underway for the Spring outage.
Replacement
Progress: Work areas have been scaffolded and many adjustments to
the hangars have been made to date. Additional work will be
McKee Run HEP completed in November.
EG1406
Pipe Repairs Schedule: Fall work activities should complete in November.
Adjustments will need to be checked once units are heated up.
Spring work still being planned.
Progress: Proposal received from vendor. COD and plant personnel
have discussed proposal and submitted a list of “to do” items to the
Metering System
EG1407 vendor for more information and clarification.
Upgrades
Schedule: Work activities are moving forward. Waiting to hear back
from vendor.
McKee Progress: Work scheduled for the Fall and Spring.
EG1408 Run/VanSant Safety Schedule: Work activities are slightly behind due to Fall Outage
Compliance Items activities.
McKee Run Natural Progress: Work scheduled for the Spring Outage.
EG1409 Gas Block-Bleed Schedule: Work activities are slightly behind due to Fall Outage
Valves activities.
EG1410 McKee Progress: Crane specifications being developed and will be put out
23
Page 35
Run/VanSant Crane for bid in mid-November.
Replacement Schedule: Work activities are progressing forward. Estimated time
period for purchase of crane is approximately January 2014.
McKee Progress: Plant staff completed development of paint specifications
Run/VanSant and bid requests were received.
EG1413
Structural Schedule: Bids were received in early September. Work is on hold
Preservation due to budget restraints.
Progress: Work scope was developed and put out for bid in
September. Quotes have been received and evaluated.
Unit 3 Turbine Recommendation of award for COD Council approval will occur in
EG1212
Repairs November 2013.
Schedule: List of consumables has been finalized and quotes are
being received..
Progress: Cost to be incurred due to repairs on Unit 1 boiler and
McKee Run Units
turbine expected to be complete in November.
EG1415 #1-#2 Component
Schedule: Other Work activities are anticipated to be completed
Repairs
during the spring outage.
Progress: Bid specifications are being developed and Environmental
permit modifications are being investigated. Communications with
PJM to get MW into system in the works with possibly a six-month
VanSant Capacity wait period is progressing. Capacity increase request is in the PJM
EG1416
Increase queue.
Schedule: Environmental Support contract work was awarded and
data is now being gathered by the contractor for use in the
environmental application process.
24
Page 36
6.0 General Plant Information
During the month of October, offers were made to individuals in order to fill the open
Operator positions. Both offers were accepted by individuals and will start work in
November, once they are cleared through the physical and background screening process.
Training:
Topics discussed during the monthly safety committee meeting were reviewed by
the entire staff. The monthly safety topic was on “Fire Prevention”. Topics
discussed during the monthly safety committee meeting were reviewed by the
entire staff.
Plant employees continue using the General Physics safety training and
environmental courses to enhance their overall knowledge of permit and safety
requirements. As the GPI courses are being completed, the employee reviews the
standard operating procedure (SMP) for the same topic they are training on to
review NAES policy as well.
Calendar of Events Date
Units 1, 2, 3 and 11 Fall Outage October 1, 2013 to November 27, 2013
Three Year Accident Free October 14, 2013
Winter Capacity Period December 1, 2013 to February 28, 2014
Annual Title V Certifications Due January 30, 2104
EIA-860 Report February 28, 2014
EIA-923 Report February 28, 2014
NOx Emissions Reconciliation Due March 1, 2014
SO2 Emissions Reconciliation Due March 1, 2014
SARA III Report March 1, 2014
NPDES Permit Renewal Due March 4, 2014
Units 1, 2, and 3 Spring Outage March, 2014 – June , 2014
Unit 11 Spring Outage March, 2014 – June , 2014
Annual VanSant Black Start Test March, 2014
Air Emission Inventory March, 2014
NOx Ozone Season Starts May 1, 2014
PJM Summer Capacity Test Period June 1, 2014 – August 31, 2014
Toxic Release Inventory (TRI) Annual Report July 1, 2014
McKee Run and VanSant Title V Semi-Annual Certification Due August 1, 2014
DRBC Study Due September 15, 2014
NOx Ozone Season Ends September 30, 2014
25
Page 37
7.0 Summary of NAES Performance to Date
Plant Performance FY 2013-2014
Measure Month Year to Date YTD FY Maximum
Incentive Incentive
Commercial
0.00% 0.09% $91,087 $94,882
Unavailability (CU)
Safety 0 0 $17,790 $17,790
Environmental 0 0 $17,790 $17,790
Capacity Tests
Summer Winter Summer Winter
Completed
Unit 1 No No Yes Yes* $3,559* $3,559
Unit 2 No No Yes Yes* $3,559* $3,559
Unit 3 No No Yes Yes* $21,349* $21,349
Unit 11 No No Yes Yes* $7,117* $7,117
Total YTD
97.71% Total YTD Incentive $162,249* $166,045
Incentive %
Note: *All units have successfully completed the PJM Summer Capacity Tests and are now included in the
PJM Winter Capacity Test Exemption Program. The YTD Incentive calculation reflects this inform
26
Page 38
IV. Appendix – PJM Invoice Breakdown
Gen Load Grand Total
Auction Revenue Rights ($26,877.93) ($26,877.93)
Balancing Operating Reserve $4,381.88 $4,381.88
Balancing Operating Reserve for Load Response $119.52 $119.52
Balancing Spot Market Energy $76,523.13 $76,523.13
Balancing Transmission Congestion $10,141.11 $10,141.11
Balancing Transmission Losses $2,902.68 $2,902.68
Black Start Service $2,357.84 $2,357.84
Capacity Resource Deficiency ($140.95) ($140.95)
Capacity Transfer Rights ($19,233.33) ($19,233.33)
CT Lost Opportunity Cost Allocation ($17.36) ($17.36)
Day-Ahead Load Response Charge Allocation $346.84 $346.84
Day-ahead Operating Reserve $2,127.44 $2,127.44
Day-ahead Scheduling Reserve $2.65 $2.65
Day-ahead Spot Market Energy $386,658.83 $386,658.83
Day-ahead Transmission Congestion ($47,706.09) ($47,706.09)
Day-ahead Transmission Losses $29,512.45 $29,512.45
Demand Resource and ILR Compliance Penalty ($3,352.23) ($3,352.23)
Emergency Load Response $19,367.41 $19,367.41
Expansion Cost Recovery $427.49 $427.49
FERC Annual Recovery $3,459.91 $3,459.91
Generation Deactivation Refund ($758.28) ($758.28)
Inadvertent Interchange ($768.58) ($768.58)
Incremental Capacity Transfer Rights ($1,761.11) ($1,761.11)
Load Reconciliation for Balancing Operating Reserve $52.30 $52.30
Load Reconciliation for Day-ahead Scheduling Reserve ($1.00) ($1.00)
Load Reconciliation for FERC Annual Recovery $22.94 $22.94
Load Reconciliation for Inadvertent Interchange $3.50 $3.50
Load Reconciliation for Market Monitoring Unit (MMU) Funding $1.49 $1.49
Load Reconciliation for Non-Synchronized Reserve ($2.06) ($2.06)
Load Reconciliation for North American Electric Reliability Corporation (NERC) $3.86 $3.86
Load Reconciliation for Organization of PJM States, Inc. (OPSI) Funding $0.27 $0.27
Load Reconciliation for PJM Scheduling, System Control and Dispatch Service $79.63 $79.63
Load Reconciliation for PJM Scheduling, System Control and Dispatch Service Refund ($2.77) ($2.77)
Load Reconciliation for Reactive Services $2,518.75 $2,518.75
Load Reconciliation for Regulation and Frequency Response Service ($84.28) ($84.28)
Load Reconciliation for Reliability First Corporation (RFC) $5.51 $5.51
Load Reconciliation for Schedule 9-6 - Advanced Second Control Center $8.68 $8.68
Load Reconciliation for Spot Market Energy ($5,861.42) ($5,861.42)
Load Reconciliation for Synchronized Reserve ($4.33) ($4.33)
Load Reconciliation for Transmission Congestion ($6,812.61) ($6,812.61)
Load Reconciliation for Transmission Losses ($1,270.56) ($1,270.56)
Load Reconciliation for Transmission Owner Scheduling, System Control and Dispatch Service $28.65 $28.65
Locational Reliability $1,384,641.66 $1,384,641.66
Market Monitoring Unit (MMU) Funding $228.03 $228.03
Meter Error Correction ($4,965.50) ($4,965.50)
Michigan - Ontario Interface Phase Angle Regulators $206.74 $206.74
Network Integration Transmission Service $342,169.01 $342,169.01
Non-Firm Point-to-Point Transmission Service ($392.87) ($392.87)
Non-Synchronized Reserve $155.22 $155.22
North American Electric Reliability Corporation (NERC) $581.52 $581.52
Organization of PJM States, Inc. (OPSI) Funding $40.12 $40.12
PJM Scheduling, System Control and Dispatch Service - Advanced Second Control Center $1,576.31 $1,576.31
PJM Scheduling, System Control and Dispatch Service - Capacity Resource/Obligation Mgmt. $943.95 $943.95
PJM Scheduling, System Control and Dispatch Service - Control Area Administration $9,838.95 $9,838.95
PJM Scheduling, System Control and Dispatch Service - Market Support $2,250.00 $2,250.00
PJM Scheduling, System Control and Dispatch Service - Market Support Offset ($215.16) ($215.16)
PJM Scheduling, System Control and Dispatch Service - Regulation Market Administration $83.83 $83.83
PJM Scheduling, System Control and Dispatch Service Refund - Capacity Resource/Obligation Mgmt. ($147.56) ($147.56)
PJM Scheduling, System Control and Dispatch Service Refund - Control Area Administration ($1,727.08) ($1,727.08)
PJM Scheduling, System Control and Dispatch Service Refund - Market Support ($398.75) ($398.75)
PJM Scheduling, System Control and Dispatch Service Refund - Regulation Market Administration ($18.31) ($18.31)
PJM Settlement, Inc. $215.16 $215.16
Reactive Services $377,806.16 $377,806.16
Reactive Supply and Voltage Control from Generation and Other Sources Service ($29,467.58) $34,909.74 $5,442.16
Real-Time Load Response Charge Allocation $661.26 $661.26
Regulation and Frequency Response Service $10,006.51 $10,006.51
Reliability First Corporation (RFC) $831.55 $831.55
RPM Auction ($1,329,125.00) ($1,329,125.00)
Synchronized Reserve $ 3,924.58 $ 3,924.58
Transmission Enhancement $4,883.03 $4,883.03
Transmission Losses ($21,350.60) ($21,350.60)
Transmission Owner Scheduling, System Control and Dispatch Service $4,320.53 $4,320.53
Grand Total $ (1,379,943.18) $ 2,598,808.50 $1,218,865.32
27
Page 39
City of Dover
Electric Revenue Fund
FY14 - White Oak Solar Park Incremental Cost
Original
July August September October YTD Budget
Power Supply & Generation
Dover Sun Park - Energy $ 187,421 $ 176,372 $ 204,852 $ 120,839 $ 689,484 $ 1,565,800
Dover Sun Park - REC's 43,005 38,516 42,894 - 124,415 300,000
Total Power Supply Cost 230,426 214,888 247,746 120,839 813,899 1,865,800
Non-Solar Power Supply Cost (180,227) (154,545) (154,590) (101,293) (590,654) (606,146)
Incremental Energy Cost $ 50,199 $ 60,343 $ 93,156 $ 19,546 $ 223,245 $ 1,259,654
Revenues
Customer Sales - Electricity (9,404) (7,389) (7,538) (7,662) (31,993) (26,300)
Rent Receipts (14,446) - - (14,446) (28,892) (58,300)
Total Revenues (23,850) (7,389) (7,538) (22,108) (60,885) (84,600)
Incremental Sun Park Cost $ 26,349 $ 52,954 $ 85,618 $ (2,562) $ 162,360 $ 1,175,054
MWh Purchased/Generated - Solar 2,052.584 1,815.656 2,000.128 1,179.844 7,048.212 18,159.000
MWh $ Solar Energy $ 91.31 $ 97.14 $ 102.42 $ 102.42 $ 97.82 $ 86.23
Solar REC's MWh 307.000 272.000 300.000 - 879.000
MWh $ Solar REC (one month lag)* $ 140.08 $ 141.60 142.98 $ - $ 141.54
MWh $ Non-Solar Energy $ 87.81 $ 85.12 $ 77.29 $ 85.85
Note: Solar REC's are one month behind due to the time the invoice is received.