Page 1
REGULAR COUNCIL MEETING
AGENDA
OCTOBER 28, 2013 - 7:30 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
OPEN FORUM - 15 MINUTES PRIOR TO OFFICIAL MEETING (7:15 p.m.)
The “Open Forum” segment is provided to extend the opportunity to the general public to share
their questions, thoughts, comments, concerns, and complaints. Discussion of any item appearing
on the agenda as a public hearing is prohibited during the Open Forum as an opportunity will
be provided during consideration of that item. Citizen comments are limited to three (3) minutes.
Council is prohibited from taking action since they are not in official session; however, they may
schedule such items as regular agenda items and act upon them in the future.
INVOCATION BY REVEREND THEODORE HENDERSON
PLEDGE OF ALLEGIANCE LED BY MAYOR CAREY
AGENDA ADDITIONS/DELETIONS
* CONSENT AGENDA
Those items on the Council Agenda which are considered routine and non-controversial are
marked with an asterisk (*) and will be acted upon by a single roll call vote of the Council. There
will be no separate discussion of these items unless a member of Council so requests, in which
event the matter shall be removed from the Consent Agenda and considered a separate item.
* 1. Adoption of Minutes
A. Council Workshop of September 18, 2013
B. Regular Council Meeting of October 14, 2013
2. Public Hearings - Violations of the Dangerous Building Ordinance
A. Property Located at 24 North New Street, Owned by Mary Bessie M. Brokenbrough
(Staff Recommends: 1. Declaring This Building and All Accessory Structures on This
Property Dangerous; 2. Ordering the Property Demolished Immediately by the Owner
or Equity Owner at Their Own Risk; 3. Ordering the Building Inspector to Cause the
Demolition of the Structure If Not Completed by the Owner by October 30, 2013;
4. Ordering the City Manager with the Assistance of the City Solicitor to Cause the
Cost of Demolition to Be Charged Against the Land on Which the Building Exists as a
Municipal Lien or Cause Such Cost to Be Added to the Tax Duplicate as an Assessment,
or to Be Levied as a Special Tax, or to Be Recovered in a Suit at Law Against the
Owner.)
Page 2
Council Agenda - October 28, 2013 Page 2
2. Public Hearings - Violations of the Dangerous Building Ordinance (Continued)
B. Property Located at 142 Brandywine Drive, Owned by the United States of
America/VET20
(Staff Recommends: 1. Declaring This Building and All Accessory Structures on This
Property Dangerous; 2. Ordering the Property Repaired or Demolished by
November 28, 2013 by the Owner or Equity Owner at Their Own Risk; 3. Ordering the
Building Inspector to Cause the Repair or Demolition of the Structures If Not
Completed by the Owner Within 10 Days of the Date Established by City Council;
4. Ordering the City Manager with the Assistance of the City Solicitor to Cause the
Cost of Repairs or Demolition to Be Charged Against the Land on Which the Building
Exists as a Municipal Lien or Cause Such Cost to Be Added to the Tax Duplicate as an
Assessment, or to Be Levied as a Special Tax, or to Be Recovered in a Suit at Law
Against the Owner.)
3. Parks, Recreation, and Community Enhancement Committee Report - October 14, 2013
A. Future Use of the Dover Park Recreation Center
(Committee Recommended Assigning the Dover Park Study to the Planning Department
for the Purpose Of: 1) Developing a Request for Proposals (RFP) to Address the Most
Appropriate Investment of City-Wide Park Resources in Dover Park, Schutte Park, and
the Parks Located in the Southwest and Southeast Corners of the City; 2) to Determine
Whether the Investment of Sufficient Resources Is Necessary to Address All Outdoor
Use, Indoor Use, Restroom Facilities, Security Facilities; 3) as a Part of the RFP, to
Make a Recommendation on What the Best and Most Effective Expenditure of
Resources Is Before a Decision Is Made to Expend Additional Resources on Any of the
Park Facilities Within the City; 4) as a Part of this Review, There Should Be a Resource
Inventory to Determine Whether or Not the City Has Any of the Prior Studies and to
Determine If They Are Practical for Future Use; and, 5) to Gather Additional Input Not
Only from the Communities on the East Side of Route 13, But Also from Communities
That Have Parks in the Southern, Western, and Northern Parts of the City. This Is to
Be Accomplished Before the City Commits to Expending Any Resources to Demolish
Any Park Buildings or for the Purposes of Creating or Constructing Additional Park
Services in the City.)
(Committee Recommended That the City Re-open the Dover Park Recreation Center for
Use, Noting That Anyone Wishing to Rent the Facility Can Do So by Contacting the
City of Dover to Coordinate the Event as Needed; the Building Itself Will Not Be Closed
for Future Use until the Recommended Dover Park Study Is Reviewed.)
* B. Benchmarks Established for the Economic Development Office
(Due to Time Constraints, This Item Was Deferred Until the Next Meeting)
* C. Update - CDBG Program
(Due to Time Constraints, This Item Was Deferred Until the Next Meeting)
4. Legislative, Finance, and Administration Committee Report - October 14, 2013
A. Creation of Ad Hoc Financial and Operational Advisory Committee
(Committee Recommended Forwarding This Matter to City Council for Discussion of
a Reconfigured Composition of the Proposed Committee, with the Understanding That
the Members Endorsed the Idea in Principle)
Page 3
Council Agenda - October 28, 2013 Page 3
* 5. Quarterly Revenue Report
(Staff Recommends Acceptance of the Report)
* 6. Semi-Annual Inspection by City Manager - Robbins Hose Company
(Staff Recommends Acceptance of the Report)
7. Evaluation of Bids - Bucket Truck Replacement (Electric)
(Staff Recommends Purchasing the 2014 Bucket Truck from Dueco (Vendor of Terex) for
the Total Cost of $241,828)
* 8. Appointment of Judges - Robbins Hose Company Election - November 18, 2013
A. Jim Hurley
B. Bill Hurley
C. Jim Howlett (Alternate)
9. Council Members’ Announcements
/tm
S:\AGENDAS-MINUTES-PACKETS\Council-Agendas\2013\10-28-2013.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 4
COUNCIL WORKSHOP
A Council Workshop was held on September 18, 2013 at 6:00 p.m. with Councilwoman Williams
presiding in the absence of Council President Bonar. Council members present were Mr. Dixon,
Mr. Lynn (arrived at 6:42 p.m.), Mr. Perza (arrived at 6:09 p.m., departed at 6:29 p.m., and returned at 6:41 p.m.),
Mr. Hare, and Mr. Hutchison. Mr. Anderson and Mr. Slavin were absent.
Council staff members present were Major Bernat, Mrs. Mitchell, Mr. Koenig, and Mrs. McDowell.
Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda as presented, seconded by Mr. Hare and
unanimously carried.
OVERVIEW OF PROJECTED INCOME AND EXPENSES
Mrs. Donna Mitchell, Controller/Treasurer, reviewed the budget balances from the June 2013 Budget
Report, noting that the Water Budget resulted in an unfavorable balance of $235,000, which was
mostly attributed to the water fees being less than projected. She noted that the Wastewater Budget
resulted in a favorable balance of $404,000 more than projected and the balance tracked for the
treatment fees (differential from the amount paid to Kent County and what is collected from the
customer) resulted in an unfavorable balance of $159,000. Referring to the deficit for the County
Treatment Fees that was carried forward from the prior year, estimated at $600,000, she stated that
it was projected that an estimated $700,000 would have been collected, resulting in a favorable
result; however, since only $609,000 was collected, the deficit was not resolved. Netted altogether,
she stated that the result was a favorable balance of $10,000.
Mrs. Mitchell noted that the Electric Revenue Fund came in below budget in the amount of
$325,000, all attributed to PJM charges and fees, which were $1M unfavorable; however, the
favorability in other expenses covered most of those charges and fees. The Electric Revenues came
in within $2,000 of what was projected.
Mrs. Mitchell advised members that a budget amendment would be presented to City Council for
Capital Projects in the General Fund to be carried forward from the previous fiscal year, as follows:
1) Salt Barn; 2) Garrison Oak Infrastructure Project (streets and stormsewer); 3) Streets
Program; and 4) Police Parking Lot Repaving. In addition, she stated that there would be carry
forward projects for Water/Wastewater, which would be presented by the City Manager later in the
meeting. She noted that there would be some carry forward projects for the Electric Fund and,
although there was an $880,000 favorability, the Unit 3 Project for the Turbine remained; therefore,
it would be necessary to re-budget some of those monies for next year.
Mrs. Mitchell reviewed a number of financial spreadsheets that were provided to members, including
the General Fund Cash Receipts and Budget Report as of September 15, 2013 for Fiscal Year
2012/2013; All Funds Summary Fiscal Year 2014; Revenue Report for Fiscal Year 2014 as of
August 31, 2013; Regional Library Project; Debt Financing Requirements, Schedule for State of
Delaware - Office of Drinking Water; Debt Financing Requirements, Schedule for State of
Delaware - Delaware Water Pollution Control; Series 2008 Electric Revenue Bonds; and the
Water/Wastewater Improvements and Extension Fund - Major CIP Projects (preliminary) as of
June 30, 2013 (Exhibit #1).
Page 5
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 2
Referring to the Unfunded Liability for the Pension Plan, Mr. Hutchison questioned what the City’s
annual payment commitment is based on. Responding, Mrs. Mitchell stated that if the City were
fully funding the Other Post Employment Benefits (OPEB) Fund, this would amount to $7M each
year (based on the last actuarial evaluation) and that the Pension Funds would amount to
approximately $3M each year. She noted that when the last actuarial evaluation was done, only the
employees participating in the Fraternal Order of Police (FOP) union were contributing 15% toward
health care, and once other employees were paying the 15%, a new study should reflect that amount
being reduced.
Mrs. Mitchell reminded members that in accordance with the City’s Financial Policies, excess
budget balances are transferred to the pension funds, which was accomplished last year and resulted
in a $7M infusion of cash in the Pension Fund. As a result, she anticipated a change in the actuarial
study in this regard. She stated that although the annual numbers should be reduced, she was unsure
of the amount at this time.
With reference to the police liability for the State’s Pension Plan, Mrs. Mitchell noted that this
information was not provided since it is a State Plan; however, the City contributes slightly more
than 15% of the payroll, which includes normal and liability costs.
Regarding the loss of income, such as real estate transfer tax, Mr. Hutchison questioned what was
being done to offset such losses. Responding, Mrs. Mitchell stated that to address the loss for
transfer tax, there had been staff reductions and other steps, such as not budgeting for vehicles, street
programs, and other projects.
Mr. Hutchison felt that staff should educate the entire City workforce regarding the City’s financial
issues, for everyone to have a better understanding of all the facts and to gain participation and
cooperation in this regard.
Mr. Scott Koenig, City Manager, advised members of the difficulty in budgeting certain projects and
programs when others are involved with the decision making, such as the State Legislature relative
to the Municipal Street Aid monies provided to municipalities.
Mrs. Williams stated that she had conducted research and found that those municipalities that have
the Payment in Lieu of Taxes (PILOT) were provided much more than $300,000 and noted that some
communities were provided as much as $3M to $5M. She felt that PILOT is similar to the unfunded
liability and that the City should be receiving much more in the way of PILOT. Responding,
Mr. Koenig felt that there should be more communication with the legislative delegation to
determine how such an issue could be resolved at the State level since the City could develop a
PILOT program for other properties in the State, and indicated that this was the direction in which
the City was moving. As an example, he advised members that the development report for the
Sheraton property plan noted the City’s expectation to develop a PILOT agreement with the Sheraton
since the property would be taken off of the tax rolls if Delaware State University purchases the
property, explaining that emergency services would continue to be provided for the property.
Mrs. Williams encouraged staff to begin discussions with the State immediately to develop a formula
that would increase each year as expenses increase.
Page 6
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 3
Responding to Mrs. Williams regarding revenues involving the Calpine project, Mr. Koenig stated
that there would be some property tax revenue (between $20,000 and $50,000), since Calpine would
be taxed only on the building since the land was being leased from the City. He stated that the
biggest portion of revenue anticipated was relative to the water system, which was estimated at
almost $2M. He noted that there would also be associated wastewater revenue. He explained that
the actual increase in water revenue would not be realized in the budget until approximately Fiscal
Year 2016.
PRELIMINARY REVIEW FOR NEXT YEAR - DISCUSSION OF STAFFING LEVELS,
WORKFLOW, AND PROGRAMS - PUBLIC WORKS
Mr. Koenig reiterated that the presentation being provided to members was very informal, explaining
that the purpose was to provide members with an idea of the focuses that the Department of Public
Works had been working on to develop their department and address service levels as requested
and/or expected.
Mr. Koenig provided a draft Exempt Status list of Public Works Department employees
(Exhibit #2). In addition, he provided members with the Fiscal Year 2014 Draft Annual Operating
Budget for each General Fund division of the Public Works Department (Exhibit #3). He reviewed
the details involving the development of this Draft Budget and explained that focus was on service
delivery and becoming the first Public Works Department to receive accreditation in the State of
Delaware (and one of the few in the northeast region). He briefly explained the handwritten notes
indicating the goals and needs of each division.
In reviewing the budget for Public Works - Administration (Page 2 of Exhibit #3) and in response
to Mrs. Williams, Mr. Koenig stated that there was no substantial out-of-pocket expense for applying
for the accreditation (application fee) and the return on receiving accreditation would be realized in
the savings from implementing efficiencies as a result of conducting the internal review associated
with the accreditation process. Although the efficiencies had not currently been financially
quantified, the Public Works Director felt that getting employees focused on their jobs and building
professionalism and dedication would result in efficiencies.
Mr. Koenig noted that a major issue involving the Public Work Department was that much of staff’s
time was spent “in the field.” The use of the GIS technology had continuously been pulled from the
budget for the past couple of years because staff was unsure of the use of the technology, such as
how it is applied, how to make the inspectors and field staff more efficient, etc. Moving forward,
he stated that staff was going to try to implement technology as it becomes available. In addition,
he stated that a part of this effort would meet the asset management requirements of the Finance
Department, noting that a great deal of inventory, including large water, sewer, street, and storm
sewer systems, as well as inventory such as ditches that are not included in an asset management
system. He stated that buildings are not included in an asset management system. Instead of
proactively considering the replacement of a roof, he stated that staff tends to react, which drives up
the costs since these needs are not being planned; however, utilizing GIS technology as an asset
management tool, staff would be able to take a proactive approach.
Page 7
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 4
Mr. Koenig advised members that the inclusion of training and certification for all divisions of the
Public Works Department would be a constant. He explained the importance for the City to provide
the opportunity for all departmental directors to attend national conferences to learn from other
directors and bring information back, with the expectation that they would transfer the knowledge
to other City department heads and City Council. He stated that there are certification and license
requirements beginning to be implemented; therefore, there was need for training and education. He
explained that the City would budget for the training and education, with the understanding that staff
would participate and demonstrate that it is beneficial.
Referring to the budget for Public Works - Fleet Maintenance (Page 3 of Exhibit #3), Mr. Koenig
reminded members that at one time the entire division was fully privatized, subsequently all
functions were brought back in-house, and currently there was a combination of privatization and
in-house functions. He indicated that staff was prepared to make an offer to a Field Supervisor who
would oversee both fleet and facilities employees and be responsible for adding a professional level
to the Fleet Maintenance Shop. In order to maintain the details regarding the City’s fleet, which
currently consists of 188 vehicles and 48 pieces of equipment, he stated that it would be necessary
to utilize technology.
In response to Mrs. Williams, Mr. Koenig stated that the police vehicles and Fire Department
vehicles are not serviced by the City’s Fleet Maintenance staff. Clarifying, Mrs. Mitchell stated that
the maintenance of the police vehicles is outsourced under the State’s contract.
Mr. Koenig referred to Public Works - Facilities Management (Page 4 of Exhibit #3) and advised
members that attempts were being made to make all City buildings more energy efficient and
anticipated that the costs for electricity would be reduced. As employees have retired, the amount
for contractual services had increased due to the City privatizing custodial services at several
buildings including the Warehouse, Pitts Center, and Electric Administration, with 5 East Reed
Street utilizing a combination of both in-house staff and contractual services. As more of the
employees in this division retire, he stated that a decision would have to be made as to whether or
not the City wishes to expand contracts for privatization of this service or hire personnel.
Mr. Koenig reiterated the need for all departments to utilize asset management software. The idea
would be to begin considering how to set aside funds for maintaining the City assets to avoid big
“spikes” in the budget.
Referring to Public Works - Grounds (Page 5 of Exhibit #3), Mr. Koenig stated that this division had
gone through some transitions, explaining that some of the grass mowing services were privatized,
employees had resigned, and other employees had to take medical retirement. Due to the shortage
of employees, in August, the grass mowing contract was expanded; however, he stated that there had
not been a full “growing” season for that contract. He advised members that there were several
complaints from residents regarding their disappointment in the aesthetics of the parks related to
grass mowing, particularly in regard to the trimming around trees, concrete, etc. He explained that
it would take another year before the City would be able to fully evaluate the privatization of the
grass cutting and that the City’s expectations should be included in such contracts in the future.
Mr. Koenig stated that he was not happy with the appearance of the City parks either and felt that
the City needed to figure out ways to increase the curb appeal of the City’s parks and public spaces.
Page 8
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 5
With regard to the gasoline expenses, he explained that as more areas are transferred to contractual
services for grass mowing, the City would mow less, which should result in a decrease in gasoline
expenses; however, he noted that the expenses for contractual services would increase.
Mr. Koenig advised members that Mr. Bill Cooper, Grounds Superintendent, had announced that
he would be retiring after 35 years of service; therefore, there would be a new supervisor coming on
board.
Regarding Public Works - Sanitation (Page 6 of Exhibit #3), Mr. Koenig stated that he was once an
extreme advocate for sanitation being an enterprise fund; however, his accounting dissertation during
the past few years had led him to the conclusion that it should serve as a service fee rather than a
separate enterprise fund. He explained that the City’s sanitation service is primarily a residential
service and that the system is set up best to pickup residential containers. Although the City
currently provides service to numerous commercial customers, moving forward, there was a plan to
reduce the number of commercial customers as sites are redeveloped. During the Development
Advisory Commission (DAC) review process, when it is determined that a site exceeds the City’s
ability to collect waste, the developer would be notified to design the site for private trash collection
and the occupant would become a private customer rather than a City customer. He stated that a site
may exceed the City’s ability for collection as a result of screening requirements, explaining that
private sector collectors open dumpster enclosure doors but the City does not. Additionally, there
are commercial customers whose needs are beyond what the City can provide, such as providing an
eight (8) yard dumpster or a more convenient pickup time.
Mr. Koenig stated that the budget for sanitation contractual services included landfill fees and the
recycling contractor. He noted that the recycling contractor extended the contract for Fiscal Year
2014 with no increase; however, the contract would be rebid this year for Fiscal Year 2015, so an
increase would be a possibility. As the economy rebounds, he advised members that the amount of
trash put out increases. He noted staff’s concern regarding an increase in trash because the Delaware
Solid Waste Authority (DSWA) contract includes an increase in the tipping fee each year for the next
couple of years, which, if the tonnage stays the same as last year, would equate to a $30,000 to
$40,000 increase.
In regard to the expense for gasoline for the Sanitation Division, Mr. Koenig indicated that the trash
trucks get only approximately four (4) miles per gallon. Although attempts would be made to
minimize these expenses by increasing communication between the truck drivers and office staff and
establishing more efficient routes, substantial savings were not anticipated because the City would
continue to provide the expected level of customer service (e.g. responding to customer calls by
sending drivers back out to pick up a container that was not put out in time for the original pick up).
Responding to Mr. Hare regarding recycling, Mr. Koenig stated that the City collects approximately
15 pounds per location, per month. Although the City loses money as a result of the recycling
program, he explained that the program provides a benefit to the environment and reminded
members that recycling was a State mandate.
Page 9
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 6
Mr. Koenig advised members that staff was currently reviewing possibilities for improving ways to
address yard waste. He stated that the City had been working with Delaware Department of Natural
Resources and Environmental Control (DNREC) on a pilot project regarding composting at Schutte
Park, where the City takes yard waste and, under DNREC’s supervision, determines if it can be
prevented from having to be dumped at the landfill. A test was scheduled for this fall and would last
for a 60 day period, at the conclusion of which staff woulddetermine if it should be turned into a
long-term project.
Referring to Public Works - Streets (Page 7 of Exhibit #3), Mr. Koenig advised members that there
were compliance issues associated with this division which would need attention. He explained that
the City had not obtained the necessary permits relative to MS4 (Municipal Separate Storm Sewer
Systems) compliance. The City would be forced to improve the storm sewer program, both
administratively and on the street, recording all items during the next few months. Mr. Koenig
anticipated that matters would be presented to City Council in the next budget for an expense related
to MS4 compliance. He stated that the issue regarding flood plain management was tied to MS4
compliance, explaining that the flood maps were becoming more tied to Federal Emergency
Management Agency (FEMA) reimbursements and other emergency management issues. Currently,
the flood plain maps were maintained by the Planning Department; however, he anticipated that they
would be made a part of the Public Works Department since they would become a part of the GIS
system.
Mr. Koenig indicated that although the Silver Lake Dam is a small dam, it is considered a high risk
category because if the dam breaks, it could affect houses. Therefore, a five (5) year inspection is
required on the dam by a third party, which would equate to a $7,000 to $10,000 expense that would
be included in the budget for next fiscal year.
Having an understanding that there was a desire for this workshop to provide possibilities for
improving the budget, Mr. Koenig stated that it would be very difficult to cut the budget in the
Department of Public Works due to numerous issues related to compliance, service delivery, and
infrastructure that would make it nearly impossible to cut costs without changing the level of service.
Mr. Koenig reminded members that, during the Special Council Meeting (Budget Review) of
May 29, and June 5, 2013, it was estimated that the City should be spending $1M to $1.5M every
year on street maintenance. He explained that Public Works was a large department with many
expenses but that the amounts budgeted provide the bare level of services that help make the City
of Dover the city that it is. He reminded members that the number of employees had been reduced
and other budget items were eliminated or reduced as much as possible to allow the department to
continue to maintain the current level of services and to achieve or maintain compliance.
In response to Mr. Hutchison regarding brown water problems, Mr. Koenig noted that almost every
year, the Water/Wastewater Budget included approximately $1M for water quality improvements
(pipe replacement) and $1M for inflow/infiltration improvements. He advised members that no
specific water quality projects were budgeted in the current fiscal year, since the City funneled a
substantial amount of money into the Garrison improvements and planned to catch up on other
projects that were “pushed out” during the previous fiscal year, such as the replacement of the Piney
Point Well. He stated that many of the brown water complaints were related to instantaneous “hits”
Page 10
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 7
on the system, from the Power Plant going on and off or a fire in the system, which create flow
reversal and result in a burst of brown water. In talking to engineers in other larger, older cities such
as Baltimore, Wilmington, Philadelphia, etc., he stated that they have these same types of issues.
He noted that there were some areas in the City that experience more of a problem than others and
that the replacement of piping appeared to solve many of these types of issues. He explained that
the City was conducting a project which included a combination of line replacement and water main
relining, noting that relining is a complicated project but in some instances can be less expensive.
He stated that in the modeling of the City’s system, it had been discovered that many pipes installed
in the early 1900s were undersized and unable to carry standard fire flow. In these instances, the
relining of a four (4) inch water main would not serve the City since the model indicated that a six
(6) or eight (8) inch pipe was required. He assured members that this would be an ongoing project
that would be included in perpetuity, with a minimum of $1M budgeted each year for the renewal
and replacement of water lines.
Mr. Hare advised members of a flooding problem in the Woodbrook Subdivision, explaining that
every time it rains, the pond backs up and floods residents’ basements. Responding, Mr. Koenig
indicated that drainage issues were beginning to mount and advised members that a lot of work for
the State Conservation District was currently under contract and scheduled to begin; however, the
problems with ditches and ponds would require additional monies. He reminded members that
stormwater management ponds became the standard a little over 20 years ago and some that are
owned by the City were beginning to fail. He stressed the need for the City to improve maintenance
on ditches, ponds, etc.; however, he stated that these types of improvements are time consuming and
can be costly. He warned members that when this work begins in their district, they will know
because they will receive complaints from constituents due to the fact that private property must be
accessed to conduct the maintenance.
Mr. Hutchison stated his understanding that the improvements on Governors Avenue and near
Lynnhaven Drive would have addressed most of the flooding problems from Water Street to
Bayhealth. Responding, Mr. Koenig stated that the improvements helped the Puncheon Run;
however, they did not help flooding problems at Bayhealth. He stated that the City had applied for
a planning grant at the Department of Natural Resources and Environmental Control (DNREC) to
study the Tar Ditch basin. He indicated that it would cost an estimated $10M to $15M to upgrade
the storm drain system, dig through the old Public Works site, remove the contamination area, and
abandon and restore the old Public Works site.
Mr. Koenig provided members with the Fiscal Year 2014 Draft Annual Operating Budget for each
division funded by the Water/Wastewater Fund in the Public Works Department (Exhibit #4). He
reviewed the details involving the development of this Draft Budget and explained the handwritten
notes indicating the goals, needs, and/or desires within each division.
Referring to Public Works - Water Treatment Plant (Page 2 of Exhibit #4), Mr. Koenig reminded
members that when Calpine comes on line, there will be a need to expand staff, which would take
place during the FY2015 Budget. He explained that the budget reflected the costs associated with
running the water treatment plant on Long Point Road, the 22 wells that feed the system, and the six
(6) elevated storage tanks, with an additional two (2) tanks planned for the future.
Page 11
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 8
With reference to Public Works - Water Management (Page 3 of Exhibit #4), Mr. Koenig stated that
there are approximately 200 miles of water pipe in the system, which had been categorized by type,
and that staff was attempting to determine during which years the work would be completed;
however, there was a constant need to obtain information for inclusion in the asset management
database. He advised members that although the City had a high-quality water system, there are
issues with asbestos pipe and galvanized water services. He explained the importance of the
distribution system maintenance (renewals and replacement) in order to maintain the quality of the
water system.
Mr. Koenig referred to Public Works - Waste Water Management (Page 4 of Exhibit #4) and advised
members that when there is a heavy rainfall, a lot of effort is put forth with managing the waste water
system to prevent spills, overflows, etc., which involve contractors (pumping out systems) as well
as employees. He indicated that industrial sampling and lab analysis would be required to ensure
the City is complying with the industrial permits associated with waste water with the County.
Mr. Koenig stated that Public Works - Water Construction (page 5 of Exhibit #4) was the in-house
construction unit, explaining that when there are water quality projects in residential areas, these
employees perform some of the water line replacement work. He stated that staff was reviewing this
division closely to ensure that such in-house work was being performed within a reasonable cost.
He stated that although it was beneficial to have a crew available to do such work, it was not staff’s
desire to have it accomplished at a higher cost than if the work was contracted.
Referring to Public Works - Water Treatment Plant (Page 6 of Exhibit #4), Mr. Koenig reiterated
that it would be necessary to have an employee dedicated to the MS4 and storm water permit in the
future. His stated that a new position for either a civil engineer or environmental scientist would be
requested in the next budget to address the MS4 and industrial permits, explaining that the City
needed an employee that can be dedicated 40 hours per week to ensure the City was making progress
toward compliance in this regard. This employee would also serve as the key person for the flood
plain and Silver Lake Dam management.
Mr. Koenig reviewed the Water/Wastewater Improvement and Extension Fund - Major CIP Projects
(Preliminary) as of June 30, 2013 (Page 11 of Exhibit #1), stating that he was very happy with the
progress that was made on these projects, especially while being short of staff. He explained that
many projects had been completed; however, there were numerous projects which still needed to be
completed in order to “catch up.” Going into Fiscal Year 2015, he stated that staff had discussed
budgeting $1M or more for the Street Program, $1M for water quality, and $1M on Inflow and
Infiltration (I & I). The current budget included funding for I & I and water quality and staff would
be requesting funds for the Street Program. In regard to water and sewer, it was his opinion that the
City was in a good position to maintain the capital plan and address asset management and the
compliance issues, as discussed. However, he stated that the reductions to the General Fund were
becoming evident to members as well as constituents, and that staff and Council would need to
reevaluate and determine what level of service to maintain. In order to achieve and maintain the
level of service that he would like, funds would need to be budgeted.
Page 12
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 9
Mrs. Mitchell advised members that the spreadsheet was dated June 30, 2013 and did not include
the budget amendments approved by City Council in July for the Garrison Oak Project; therefore,
it reflected the original $2M for the water rather than $4.2M, and $2M for the sewer rather than the
$3.5M that was since approved. Since these amounts were increased, she reminded members that
the water quality and the I & I funds were eliminated from the FY2014 Budget to make up the
difference.
Responding to Mrs. Williams, Mr. Koenig stated he would not be proposing any additional funding
in FY15 over what was in the FY14 budget and the water and sewer model. For clarification,
Mrs. Williams questioned what amount would be necessary in order for the City to maintain the
infrastructure and service level. Responding, Mr. Koenig estimated that the Water/Sewer Fund was
approximately $15M and explained that the majority of the revenues received are used for operations
and capital for the Water/Sewer Fund, with a $500,000 transfer to the General Fund.
In response to Mrs. Williams, Mrs. Mitchell stated that the Water/Sewer CIP is approximately $2M
per year for water and $2M per year for sewer, explaining that more than $500,000 is attributed to
the cost of equipment replacements each year. She stated that maintaing the status quo for the
General Fund would require approximately $1.7M; with approximately $1M to $1.5M for the Street
Program and $700,000 for the purchase of police and other vehicles. It was her opinion that
combined, the General Fund and Water/Sewer Fund would need a minimum of $1.5M to $2M
additional funding in order to maintain or improve the City’s current service levels and assets.
In response to Mr. Hare, Mr. Koenig stated that currently, the State does not provide the City of
Newark a payment in lieu of taxes (PILOT). He advised members that the PILOT Program is spread
out between Wilmington, Dover, and Georgetown.
Mr. Hutchison stated that the City of Dover is unique because it is the Capital of the State of
Delaware, and noted that there are many exempt buildings within the City. With the City receiving
only $317,000 from the State of Delaware for PILOT, he suggested negotiating with the State to
provide additional PILOT monies.
Mrs. Williams advised members that the City of Rehoboth Beach receives funding for State
maintained roads. She stressed the need for developing creative ways and means of collecting
revenues for the City.
Mr. Koenig explained that staff had been conscious of managing the operating budgets. He advised
members that staff had been receiving feedback from citizens regarding their disappointment in the
level of service that had been provided by the City recently. As a result, he stated that members of
Council need to determine if the current level of service was desired or if amendments and
adjustments should be made that would allow the City to get back to the level of service that was
provided for many years.
Mr. Koenig stated that the presentation provided included those items staff felt would be necessary
to budget in order to meet compliance issues, service delivery issues, and what was interpreted as
the message that had been provided by City Council. Understanding that there was a cost involved,
he stated that it would take between now and May of next year to begin developing those costs.
Page 13
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 10
Should there be an item that had been presented by staff that members did not wish to consider, he
requested that staff be advised so that they know what should be done moving forward. With
reference to the $7.5M deficit in the General Fund Budget that needed to be addressed over a three
(3) year period, he stated that the budget could not be cut to meet that balance and relayed concern
that the budget had been cut in certain areas that had marginalized service delivery. He explained
that the items included in the presentation (addition of positions and additional funds for programs)
were not included in the $7.5 deficit; therefore, if those items were included in the budget, the deficit
would increase.
Mr. Lynn noted that the PILOT Program was a part of the Comprehensive County Seat Relief (CSR)
Package. For FY2013, the projected PILOT Program for the City of Wilmington was $2.1M and
their total CSR was $7.7M. He suggested that the City Solicitor’s Office be requested to review the
statutory language in the CSR Act to assure that the amounts provided were computed correctly and
if the City would be within their rights to request some type of meeting with the State to re-negotiate
the City’s CSR. He reminded members that the State viewed the City of Wilmington as the State’s
Capital and viewed the City of Dover as the Capital in name only, which had and continued to create
problems.
Mrs. Mitchell advised members that she had the calculations used in determining the amount
provided to the City because she had questioned their calculations last year. At the request of
Mr. Lynn, she offered to provide this information to members. In reviewing the Fiscal Year 2013
Budget for the City of Wilmington, Mr. Lynn noted that $2.1M was included for PILOT, $4.47M
for State UCC filing fee, $300,000 for the Statutory Trust Filing fee, and approximately $850,000
for New Castle County Corporate filing fees. He stated that Wilmington’s CSR Package increased
by approximately $300,000 last year, which was almost as much as the City receives in PILOT alone.
Mrs. Mitchell noted that the $2.1M for PILOT was a decrease, explaining that this appropriation had
been as high as $3M in the past. Responding, Mr. Lynn stated that the City of Wilmington did not
lose money since the total CSR Package was over $300,000, noting that the difference was made up
by the UCC filing fee.
Mr. Hare advised members that the University of Delaware did provide some type of PILOT to the
City of Newark. He suggested that Delaware State University provide something similar for the City
of Dover. Although he agreed that something should be done in this respect, Mr. Koenig stated that
the University of Delaware has a much bigger influence on the City of Newark than Delaware State
University has on the City of Dover.
Mrs. Williams suggested that a formula be developed that would allow for all non-profits to
contribute, according to their budgets.
Mr. Lynn questioned if staff could provide the ratio of land space to compare the University of
Delaware with Delaware State University in this respect.
Mayor Carey announced that the Police Department was currently evaluating their needs for
equipment and manpower and that an update would be provided to members of City Council once
a plan was finalized.
Page 14
COUNCIL WORKSHOP OF SEPTEMBER 18, 2013 PAGE 11
Mr. Hare moved for adjournment, seconded by Mr. Lynn and unanimously carried.
Meeting adjourned at 7:51 p.m.
Beverly C. Williams
Acting Council President
BCW/TM/jg
S:\AGENDAS-MINUTES-PACKETS\Council-Minutes\2013\09-18-2013 Workshop.wpd
Exhibits
Exhibit #1 - Financial Spreadsheets Provided to Members by Mrs. Donna Mitchell, Controller/Treasurer
Exhibit #2 - Draft Exempt Status List of Public Works Department Employees
Exhibit #3 - Fiscal Year 2014 Draft Annual Operating Budget for each Division of the Public Works Department -
General Fund
Exhibit #4 - Fiscal Year 2014 Draft Annual Operating Budget for each Division of the Public Works Department -
Water/Wastewater Fund
Page 15
EXHIBIT #1
Council Workshop of 09/18/2013
Page 26
EXHIBIT #2
Council Workshop of 09/18/2013
EXHIBIT #2
Council Workshop of 09/18/2013
Page 27
EXHIBIT #3
Council Workshop of 09/18/2013
Page 34
EXHIBIT #4
Council Workshop of 09/18/2013
Page 40
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on October 14, 2013 at 7:30 p.m. with Council President
Bonar presiding. Council members present were Mr. Dixon, Mr. Lynn, Mr. Perza, Mr. Slavin,
Mrs. Williams, and Mr. Hutchison. Mr. Anderson and Mr. Hare were absent.
Council staff members present were Police Chief Hosfelt, Mrs. Mitchell, Mr. Koenig,
Mrs. Townshend, Fire Chief West, City Solicitor Rodriguez, and Mrs. McDowell. Mayor Carey was
also present (departed at 7:51 p.m.).
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Bonar declared the Open Forum in session and reminded those present that
Council was not in official session and could not take formal action.
Mr. Roy Sudler, 353 Rita Wilma Lane, as Chair of the Dover Human Relations Commission
(DHRC), advised members that the DHRC recently received an enormous amount of complaints
from Mr. Eshed Alston, Mr. Bobby Wilson, and Mr. Lamar Gunn. As a result of the recent
ordinance amendments involving the DHRC, he stated that members are seeking guidance and
instructions on how to respond to those complaints in accordance with the new decree for the DHRC.
He stated that there are a list of 10 complaints that he will submit to the Legislative, Finance, and
Administration Committee, City Council, and the Mayor. He assured members that the DHRC is
eager to receive instructions on how to proceed in order to respond within a reasonable time frame.
Mr. Sudler stated that the DHRC is looking forward to working closer with all entities of the City
of Dover to ensure a fair and higher quality of living among all segments of Dover, Delaware.
The invocation was given by Bishop Thomas L. Holsey, followed by the Pledge of Allegiance led
by Bryce Bundek.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda as presented, seconded by Mrs. Williams and
unanimously carried.
Mr. Slavin moved for approval of the consent agenda as presented, seconded by Mr. Dixon and
carried by a unanimous roll call vote (Anderson and Hare absent).
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF SEPTEMBER 23, 2013
The Minutes of the Regular Council Meeting of September 23, 2013 were unanimously
approved by motion of Mr. Slavin, seconded by Mr. Dixon, and bore the written approval of
Mayor Carey.
PROCLAMATION - NATIONAL COMMUNITY PLANNING MONTH
Mayor Carey read the following Proclamation into the record:
WHEREAS, in every community, change is constant and affects all of us however community
planning and plans can help manage this change in a way that provides better choices for how
people work and live; and
Page 41
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 2
WHEREAS, community planning provides an opportunity for all residents to be involved in making
choices that determine the future of their community; and
WHEREAS, the full benefits of planning requires public officials and citizens who understand,
support, and demand excellence in planning and plan implementation; and
WHEREAS, the American Planning Association and its professional institute, the American Institute
of Certified Planners, endorse National Community Planning Month as an opportunity to highlight
the contributions sound planning and plan implementation make to the quality of our communities
and environment; and
WHEREAS, the celebration of National Community Planning Month gives us the opportunity to
publicly recognize the participation and dedication of the members of the City of Dover Planning
Commission and other citizen planners who have contributed their time and expertise to the
improvement of the City of Dover.
NOW THEREFORE, I, CARLETON E. CAREY, SR., MAYOR OF THE CITY OF DOVER,
DELAWARE, do hereby proclaim the month of October 2013 as NATIONAL COMMUNITY
PLANNING MONTH in the City of Dover, and encourage all citizens to recognize the valuable
contributions made by community and regional planners and our partner agencies at the State and
county level, and extend our heartfelt thanks for the continued commitment to public service by these
professionals.
Mayor Carey presented the Proclamation to Mrs. Ann Marie Townshend, Director of Planning and
Community Development, as well as Mrs. Dawn Melson-Williams, Ms. Janelle Cornwell, and
Ms. Connie Holland. Mrs. Townshend explained that Planning is very much a team effort, which
includes City Staff, Planning Commission Members, members of City Council, and members of the
public. She advised members that Mrs. Melson-Williams and Ms. Cornwell have been the heart of
the Planning Office for the past decade. She indicated that Ms. Cornwell recently left the City for
employment at Kent County and noted that Planning cannot be accomplished without the
partnerships that the City has with Kent County, as well as the State of Delaware. Mrs. Townshend
thanked Ms. Holland for the role she has played in Planning at both the county and state levels, and
for serving as a great mentor to her over the years.
Having an understanding of the importance of a good partnership, Mr. Hutchison relayed his
appreciation to the City’s Planning Department, Kent County Planning, and the State of Delaware
for their hard work and dedication.
Council President Bonar also thanked Ms. Holland, Ms. Cornwell, Mrs. Melson-Williams, and
Mrs. Townshend for what they have done for the planning process in the State, County, and City.
PRESENTATIONS - 2013 MAYOR’S ARTS AWARDS
Mayor Carey reminded members that, every October, the Mayor’s Arts Awards are presented to
recognize those that have excelled in providing a variety of arts, entertainment, and education in
Dover, making the area a better place to live and work, which is good for our community, economy,
Page 42
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 3
and the City’s future. He stated that this years recipients are honored for their part in increasing the
awareness of the Arts in Dover and he presented the 2013 Mayor’s Arts Awards, as follows:
Jan Crumpley
Mayor Carey stated that Ms. Jan Crumpley has been described as an "arts engine" by a friend. The
artist, Ms. Crumpley, is receiving a Mayor's Arts Award because of her outstanding contributions
to the arts in Dover as a Plein-Air artist, as a folk musician, and an arts organizer. Ms. Crumpley
tirelessly promotes the arts and history of Dover. She has become a treasure to local arts
organizations by donating her artistic talents, her advocacy skills, and her fundraising abilities for
the arts. She is now being recognized for her lasting and profound impact on the cultural life of the
Greater Dover area. The Mayor and the Greater Dover Arts Council are proud to honor
Ms. Jan Crumpley with a Mayor's Arts Award.
Ms. Crumpley thanked everyone for the recognition.
K. M. Hammond
Mayor Carey advised members that the painting, like life, is a puzzle in which all the parts eventually
fit together perfectly. This declared philosophy is what the self-taught artist Ms. K. M. Hammond
lives by and she is receiving a Mayor's Arts Award because of her perfectly fitting puzzle of life
dedicated to the arts. Ms. Hammond has a long list of accomplishments that include participation
in numerous art exhibitions and receiving many awards and honors for her art. Her award winning
art is displayed throughout the City. Ms. Hammond is now recognized for her lasting and profound
impact on the arts of the Greater Dover area. The Mayor and the Greater Dover Arts Council are
proud to honor Ms. K. M. Hammond with a Mayor's Arts Award.
Donald A. Parks
Mayor Carey noted that the legacy of the arts advocacy of Dr. Donald A. Parks is well known
throughout the City of Dover. His lasting impact and outstanding contributions to almost all of the
visual and performing arts in Dover qualify him to receive a Mayor's Arts Award. Dr. Parks has
successfully supported the arts through educating thousands of Delaware State University students,
to being appointed by the Governor to the Board of Trustees at the Biggs Museum of American Art,
to being a major contributor to countless arts organizations. This civic-minded individual's move
to North Carolina has been a great loss to the arts in Dover. The Mayor and the Greater Dover Arts
Council are proud to honor Donald A. Parks with a Mayor's Arts Award.
Mayor Carey indicated that Mr. Parks was not able to attend this evening’s meeting; therefore, the
actual presentation of the award will be accomplished at a later date.
PRESENTATIONS - 2013 MAYOR’S YOUTH ARTS AWARDS
Mayor Carey reminded members that a few years ago, the youth in the community were chosen to
be recognized for their great achievements as young individuals in helping to further the arts in the
City of Dover. Mayor Carey presented the 2013 Mayor’s Youth Arts Awards, as follows:
Page 43
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 4
Rachel Frebert
Mayor Carey stated that Miss Rachel Frebert, who is a Saint Thomas More Academy student, states
that "art is more than a way of life; it is who I am, who I've become, and who I will be." He
indicated that Miss Frebert is serious about art and is receiving a Mayor's Youth Arts Award because
of her ability to recognize her talent and to share it with others. Recently, her artwork was displayed
in the emergency wing of Kent General Hospital where her colorful pastel landscape could brighten
the lives of the families who saw tragedy. The art portfolio that Miss Frebert submitted for
consideration was diverse and represented a strong display of the knowledge of the elements of art
and the principles of design. The Mayor and the Greater Dover Arts Council are proud to honor
Miss Rachel Frebert with a Mayor's Youth Arts Award.
Alicia M. Fox
Mayor Carey advised members that Miss Alicia M. Fox, who is a junior at Saint Thomas More
Academy, was nominated by the Academy’s art teacher without hesitation and that the drama teacher
gave her wholehearted endorsement. Miss Fox is a promising artist whose artistic abilities should
be commended with a Mayor's Youth Arts Award. He stated that Miss Fox describes herself as
well-rounded in the arts because she is involved in drawing and painting, drama, choir, and
photography. Her art demonstrates a clear command of the subject and the technique of the medium.
The Mayor and the Greater Dover Arts Council are proud to honor Miss Alicia M. Fox with a
Mayor's Youth Arts Award.
Thomas Price
Mayor Carey indicated that the Polytech High School drama teacher describes Mr. Thomas Price as
the student who walks, talks, and breathes theater. He stated that this talented young man, Mr. Price,
is receiving a Mayor’s Youth Arts Award because of his dedication to the performing arts through
acting, directing, choreographing, and producing quality shows at high school and at The Children’s
Theater. He advised members that another teacher described Mr. Price as resourceful, creative, and
a solution-oriented person who is frequently able to come up with new and innovative approaches
to his projects. He felt confident that this is the type of person who will succeed in the arts as an
adult. The Mayor and the Greater Dover Arts Council are proud to honor Mr. Thomas Price with
a Mayor’s Youth Arts Award.
Mayor Carey relayed appreciation to Mr. Brian Miller, Chair of the Greater Dover Arts Council, as
well as the membership for their assistance in the selection of all the 2013 Mayor’s Arts Awards.
Mr. Hutchison moved for a brief recess for light refreshments, seconded by Mrs. Williams and
unanimously carried.
Meeting recessed at 7:51 p.m.
Mr. Hutchison moved to reconvene, seconded by Mr. Dixon and unanimously carried.
Meeting reconvened at 8:07 p.m.
Page 44
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 5
REQUEST TO WITHDRAW REZONING REQUEST (PROPOSED ORDINANCE #2013-14)
- PROPERTY LOCATED AT 109 EAST DIVISION STREET
A public hearing was duly advertised for this time and place to consider rezoning of property located
at 109 East Division Street, owned by Leg Hall, LLC (Rhett Ruggerio). The property is located on
the north side of East Division Street between Pennsylvania Avenue and Maple Lane. The property
is currently zoned RG-1 (General Residence) and H (Historic District) and the requested zoning is
RG-O (General Residence and Office) and H (Historic District).
Mrs. Ann Marie Townshend, Director of Planning and Community Development, referred to a letter
submitted by Mr. John W. Paradee on behalf of the property owner, Rhett Ruggerio, requesting to
withdraw the rezoning application. She advised members that during the Planning Commission
public hearing there were several in attendance that spoke in opposition to the rezoning application.
As a result, the applicant submitted a request to withdraw the rezoning application and is working
with the residents of the area on an alternative solution that may be presented at a later date.
Mr. Lynn moved for approval of the request to withdraw the rezoning application for
property located at 109 East Division Street, owned by Leg Hall, LLC (Rhett Ruggerio). The
motion was seconded by Mr. Slavin and unanimously carried.
PUBLIC HEARING ON REQUEST OF WHITE OAK/TOWNE POINT CIVIC
ASSOCIATION TO LIMIT PARKING ON MILLER DRIVE TO ONLY ONE SIDE OF THE
STREET
During the Safety Advisory and Transportation Committee Meeting of August 28, 2013, members
considered a request from the White Oak/Towne Point Civic Association President, Mr. Nelson Hill,
to conduct a study of Miller Drive to determine if parking on both sides of the street was safe. After
much discussion, members recommended that a public hearing before City Council be set for
October 14, 2013 at 7:30 p.m. to consider prohibiting parking on the north side of Miller Drive. The
recommendation for a public hearing was approved by City Council during their Regular Meeting
of September 9, 2013, and a public hearing was duly advertised for this time and place to consider
the request of White Oak/Towne Point Civic Association to limit parking on Miller Drive to only
one side of the street.
Mr. Scott Koenig, City Manager, advised members that following the August 28, 2013 Committee
Meeting, he visited the area to review the ideas put forth at the meeting. Based on the testimony at
the meeting, as well as a field visit, staff recommended placing the proposed parking restriction on
the north side of the road (odd-numbered side of the road), where the fire hydrants are located.
Placement of the restriction on the side of the road with the fire hydrants is consistent with the
parking restrictions on Boggs Drive, Buck Drive, and Carvel Drive. He stated that there is a total
of six (6) “No Parking This Side” signs that will need to be installed, based on the number of street
light poles on the north side of the street. The estimated total cost of the signs is $130.74.
Council President Bonar declared the public hearing open. There being no one present wishing to
speak, Council President Bonar declared the public hearing closed.
Page 45
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 6
Mr. Lynn moved for approval of staff’s recommendation to restrict parking on the north side
of Miller Drive, seconded by Mr. Dixon and carried by a roll call vote of six (6) yes (Dixon,
Lynn, Slavin, Williams, Hutchison, and Bonar), one (1) no (Perza), and two (2) absent
(Anderson and Hare).
UTILITY COMMITTEE REPORT - SEPTEMBER 23, 2013
The Utility Committee met on September 23, 2013 with Chairwoman Williams presiding.
Dedication of Rights-of-Way and Public Infrastructure - Lexington Glen Phase 2
Mr. Scott Koenig, City Manager, advised members that Ashburn Homes, Inc., the responsible party
for completing the public infrastructure within Phase 2 of the Lexington Glen Subdivision, had
requested that all public infrastructure improvements related to this phase be dedicated to the
City of Dover for permanent ownership and maintenance. He reviewed an outline of the public
improvements associated with Phase 2 and noted that the total construction value of the public
improvements was $414,222. In addition, he reviewed a map depicting the general location and
configuration of the subject rights-of-way.
Mr. Koenig assured members that Ashburn Homes, Inc. completed construction of the improvements
within Phase 2 in accordance with City standards and specifications. After construction was
completed, City staff inspected the public improvements and developed a list of repairs to be made
to meet the City of Dover Standards and Specifications for Public Works Construction. Mr. Koenig
noted that all work required by the Public Works Director had been completed. A one (1) year
Maintenance Agreement and a Release of Liabilities would be submitted as part of the dedication
process. He stated that the required as-built drawings of the infrastructure, as well as videos of the
sanitary sewer mains, had been provided to staff.
Staff recommended acceptance of the dedication of rights-of-way and public infrastructure in
Phase 2 of the Lexington Glen Subdivision, with the dedication to include all of the referenced
public improvements.
The committee recommended approval of staff’s recommendation for the acceptance of the
dedication of rights-of-way and public infrastructure for Lexington Glen Phase 2, to include all of
the referenced public improvements.
By consent agenda, Mr. Slavin moved for approval of the committee’s recommendation,
seconded by Mr. Dixon and carried by a unanimous roll call vote (Anderson and Hare absent).
Rate Classification/Tariff Amendment for Churches
Mr. Scott Koenig, City Manager, advised members that staff had received a request from the
Presbyterian Church of Dover (the Church) to consider a change in tariff language for the C/C1
(Small Commercial) description. Specifically, he stated that the request was to have the wording “or
have instrument rated metering” removed from the C/C1 classification description. He explained
that for this specific example, the Church had consumption levels below the 3,500 kWh/month limit
for the C/C1 designation, but their electrical service metering was of the instrument rated type, which
Page 46
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 7
would prevent them from requesting a classification change from C5 to C/C1. The Church was
seeking the new classification to avoid the demand charges associated with the C5 classification.
Mr. Koenig explained that it appeared that, several years ago, certain churches were included in the
residential tariff before commercial tariffs became customized and more sophisticated. At that time,
staff sought input from the City’s power supply attorney, Mr. Kirk Betts, on this subject. Mr. Betts
advised staff that many churches hold functions in the evening from 6-10 p.m., which is a part of
PJM’s 16-hour peak period, as well as on weekends. Typically, the more active the church, the more
likely it is to have a consumption pattern that is similar to commercial users rather than residential
users. Mr. Betts advised against creating a specialized “church” or “houses or places of worship”
tariff. Mr. Betts also indicated that, as a general rule for rate making, tariffs and rates are based upon
cost causation; therefore, similar voltage, demands, and consumption patterns should pay similar
rates. Mr. Koenig stated that, based on a review of property listings and the type of use of actual
buildings (not a review of individual demands), there were as many as 24 churches that may be in
the same situation as the Presbyterian Church of Dover; therefore, any change to the tariff could alter
the City’s revenue projections based on the modeling of the system.
Mr. Koenig reminded members that the City of Dover had spent a considerable amount of money
to complete detailed rate classifications and projections based on the approved tariff language and
classifications. Any modifications to the tariffs without analyzing the potential impact on the rates
and revenues could degrade the integrity of the current rates. Mr. Koenig indicated that detailed
modeling of the requested tariff modification would require input and analysis from the City’s rate
consultant to ensure accuracy and fairness with respect to financial modeling. He explained that
such effort would likely create costs for the utility. As an alternate solution, the Presbyterian Church
could rework their metering configuration (at a substantial cost) to comply with the current C/C1
tariff language.
Staff recommended that no action be taken on this request at this time and that the issue be evaluated
during the next rate study conducted for the Electric System.
Mr. Koenig stated that the Presbyterian Church had done a good deal of work on their usage and
demand and had been a good customer, considering that they had made attempts to conserve energy
where appropriate; however, staff was very concerned about altering the tariff language, the
unintended consequences of such alteration, and how this may affect the City’s rates.
Mr. Koenig noted that a review of the Church’s profile over the last year revealed that consumption
was under the 3,500 kWh per month consumption limit for C/C1 and ranged from 2,100 to
2,800 kWh. As a result, he stated that they do meet the kWh criteria; however, the instrument rated
metering portion was not in compliance and the concept of moving the Church from classification
to classification was a concern. He advised members that the City’s rates were standard industry
rates, there was no additional or special language included in the tariff, and the provision had been
included for several years. He explained that staff was concerned about the effect that such a change
could have on the tariffs, as well as making any adjustments in “mid-stream.” The estimated cost
of changing the Church’s service to new metering was $5,000-$7,000.
Page 47
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 8
Responding to Mr. Slavin, Mr. Koenig stated that the Church spent $240-$350 per month; therefore,
it would take approximately 2 - 2½ years to recapture the $5,000-$7,000 cost.
In the interest of disclosure, Mr. Blakeman advised members that he served as a Trustee for the First
Baptist Church; therefore, he would recuse himself from voting on this matter since he had a vested
interest. However, he questioned who installed the meter that was presently serving the Church.
Responding, Mr. Koenig stated that the City owned the meter and the Church owned the meter pan,
explaining that the meter was installed by the City to adjust to the Church’s meter pan.
In response to Mr. Perza, Mr. Koenig stated there were many properties with meters in the C5
classification, including an estimated 24 church properties. The estimated financial impact as a
result of a change for this classification would be a minimum of approximately $3,600 per year, per
location. Mr. Steve Enss, Interim Electric Director, indicated that the meter was provided based on
the size of the service. He explained that the meter provided for the Church had the capability to
take higher voltage than an average residential meter can read and bring it down to a level that could
be read with a meter. If a church requests a large service, installation of instrument transformers
would be required. If a church requests a small, 200-amp, residential-type service, a C1
classification (400 amp service and below) meter would be assigned, which would not fall into the
C5 classification. Mr. Enss indicated that there was potential for the Presbyterian Church to use
more than 400 amps; however, the Church was currently falling under 400 amp usage, and they had
the option to reduce the size of their current service. He stated that when these types of changes
occur, the expense is borne by the customer.
To clarify questions of Mr. Slavin, Mr. Enss stated that the meter was installed by the City based on
the customer’s request and service size, explaining that a service size greater than 400 amps was
requested and that the City installed an instrument transformer to meet that request. Responding to
Mr. Perza, Mr. Enss indicated that every meter is installed by the City.
Considering the time frame that it would take the Church to downsize and upgrade their meter,
Mrs. Williams questioned the possibility of the Church being charged at the rate they are using rather
than the rate of the service provided. Responding, Mr. Koenig stated that staff did not have the
authority to charge customers differently from tariff requirements; therefore, it was necessary to
place customers within the tariff that meets the definition of their service. He stated that, to his
knowledge, there had been no precedent to go beyond the tariff during the past two (2) years;
however, he felt that there may have been prior instances when temporary tariffs had been put in
place.
At the request of Mrs. Williams, Mrs. Donna Mitchell, Controller/Treasurer, confirmed that there
had never been an instance where the City had gone beyond the tariff requirements. She noted that
this action might be in violation of the City’s bond covenants, which require the City to charge
according to the tariffs.
Mr. Koenig stated that when electric demands for a facility are identified, the customer works
directly with the Electric Department to size the service, as well as the meter, to meet the demand.
Page 48
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 9
He indicated that when commercial customers desire to downsize or consolidate their businesses,
they must request a meter change, requiring an adjustment to their service size.
Responding to Mr. Hutchison, Mr. Koenig indicated that it would be a couple of years before the
City would conduct the next rate study, unless City Council directed staff otherwise. Mrs. Mitchell
suggested that members may wish to consider having the demand data gathered for this type of
classification and send this to the consultant separately to obtain his opinion in a timely manner.
Council President Bonar noted that the request of the Church was received in April and felt that staff
had ample time to gather the suggested information and provide it to members at this time for their
review and consideration. Since the Church had been waiting since April for an answer regarding
their request, he felt that members owed them an answer at this time.
Mr. Gary Patterson, 41 Park Drive, stated that he served as the Secretary of the Trustees of the
Presbyterian Church of Dover and the Clerk of Session and was serving as the representative of the
Church in regard to this issue. He advised members that the Church was now in its 299th year in the
City of Dover and, in advance of the 300th year anniversary (beginning September 2014), the
276-member congregation had committed over $300,000 in capital improvements that would be
undertaken during the next 12 months, some of which had begun. He stated that some of these
improvements included upgrades to the 1950's education wing (located right of the sanctuary), where
electric service was not “knob and tube” but contained fuses that no longer exist and parts that could
not be located; therefore, the Church had committed $20,000-$25,000 to upgrade the electrical
system. He stated that, in anticipation of this improvement and other improvements to follow, the
Church submitted their request to the City Manager’s Office. Mr. Patterson advised members of
energy efficiencies that had been instituted at the Church, including window replacements, light bulb
replacements, an A/C system (only for sanctuary), etc., explaining that the Church had taken steps
to reduce the Church’s demand; however, the issue now was relative to the C5 rate classification.
He indicated that the Church needed to know if they would be required to spend the $7,000 so that
these funds were not spent on other capital improvements and that this was the reason for the
immediacy of their request. He advised members that Mr. Ed Mulford, who conducted a five (5)
year study of the Church’s electrical usage, and Mr. John Littlefield, who had a strong industrial
background and a lifetime of experience in engineering, were in attendance and requested that
members dialogue with them for a better understanding of the particulars regarding this issue.
Mr. John Littlefield, 90 Watersedge Drive, explained that the main concern with the tariff was the
difficulty understanding why a particular meter would affect a rate classification. He stated that the
meters, in today’s world, measure demand, consumption, etc. and felt that there was no reason to
base the rate or classification on the meter or meter type.
Mr. Ed Mulford, 944 Janeka Lane, indicated that, from the Church’s perspective, the difficulty was
with the reasoning behind those five (5) words in the tariff as they exist, “or have instrument rated
metering,” which kept them from making the application successfully. He explained that the
difficulty was that, although the Church could spend the $5,000-$7,000 required to have the metering
changed and the Church’s request would then be a moot point, this would take $5,000-$7,000 away
from other mission work that the Church was trying to fulfill. Regarding energy usage, he stated that
Page 49
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 10
the Church’s records, over the 11 years reviewed, showed that, although air conditioning had been
added to areas, overall usage had been decreased. He assured members that it was their intention
to continue to take initiatives to reduce energy consumption. Mr. Mulford explained that it was the
Church’s load profile, which indicated a peak on Sundays, that “punishes” the Church. He noted
that, in accordance with the tariff, a peak demand as short as 15 minutes “punishes” them the other
six (6) days of the week; whereas, in most commercial situations, the demand charge is distributed
over a five (5) to seven (7) day usage profile.
Mr. Perza suggested that staff review the remarks made and conduct a historic review to determine
what action the City had taken in past situations when this had occurred, what impact such a change
would have on the City’s revenue from these types of classified meters, and how many customers
would be impacted by such a change.
For clarification, Mr. Perza confirmed that staff’s determination would be based on a possible
amendment to the tariff that would eliminate the phrase “or have instrument rated metering,” and
would provide information on the impact that this would have on the City in terms of revenue or
other unforeseen possibilities (effects on other non-profits, churches, commercial customers, etc.).
Mr. Slavin relayed his disappointment in the manner in which this matter had been handled. He felt
that it was poor customer service for staff to require an institution that had been a part of the City
for nearly 300 years to wait six (6) months for the matter to be considered by the Committee for their
review and recommendation to City Council and then request the Church to wait an additional 30-60
days to allow staff the opportunity to conduct further research. He stated that the Church, in addition
to being a good steward to the community, had donated two (2) of their older properties to the State
of Delaware and these properties were currently being used as a home for the Children’s Theater of
Dover and Kent County. Noting that the Church’s congregation had given back to the City and had
always treated the City well, he felt that the Church deserved to be treated well by the City; therefore,
he explained his opposition to the motion.
In response to the concerns relayed by Mr. Slavin, Mr. Perza indicated appreciation for the
contributions made by the Church; however, as a Committee member, he explained the need for the
requested information in order to make a decision. Although he felt confident that the City would
be receptive to assisting the Church in this matter, he stated that the information was necessary in
order to make a decision and help the Church meet their goal.
Mrs. Williams requested that staff also provide information on the specific impact that the
elimination of these five (5) words from the tariff (“or have instrument rated metering”) would have
on the bond covenants.
The committee recommended that this matter be referred back to staff to determine, if the requested
change were granted, based on a possible amendment to the tariff that would eliminate the phrase
“or have instrument rated metering,” what impact it would have on the City in terms of revenue or
other unforeseen possibilities; how many customers would be impacted (including other non-profits,
churches, commercial customers, etc.); and, historically, how similar changes had been made in the
past, for a report back to the Utility Committee by no later than their meeting scheduled for
October 28, 2013.
Page 50
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 11
By consent agenda, Mr. Slavin moved for approval of the committee’s recommendation,
seconded by Mr. Dixon and carried by a unanimous roll call vote (Anderson and Hare absent).
By consent agenda, Mr. Slavin moved for acceptance of the Utility Committee Report,
seconded by Mr. Dixon and carried by a unanimous roll call vote (Anderson and Hare absent).
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
SEPTEMBER 23, 2013
The Legislative, Finance, and Administration Committee met on September 23, 2013 with Chairman
Lynn presiding.
Central Dover Planning Grant Donation Request
Mr. Scott Koenig, City Manager, advised members that staff recently received a request from
Mr. Joe L. Myer to offer financial support through a $10,000 donation for a project to be known as
the Central Dover Planning Initiative. He explained that this project was part of the Wells Fargo
Regional Foundation Grant, which was awarded in the amount of $90,000. The overall total project
cost was estimated to be $120,000. He indicated that the purpose of the project was to engage the
community to address the challenges that many neighborhoods throughout Delaware and the nation
were facing – homes that were deteriorating, declining homeownership rates, persistent crime, and
limited access to services. This effort would provide opportunity for various stakeholders to work
together to make necessary improvements, organize associations, and take a holistic approach to
neighborhood building, affordable housing, economic development, and social service delivery.
Members were reminded that, in accordance with the current budget rules, the City Manager was not
authorized to transfer funds from the 10 series of the budget without City Council approval.
Mr. Koenig indicated that the request was to transfer unused salary from vacant positions to the
regular operating budget in order to make the donation to the project. He explained that if Council
did not authorize the transfer from the 10 series as requested, staff would need to identify another
area of the budget for funding, as this was an important project for the central Dover area.
Staff recommended that City Council authorize the City Manager to transfer $10,000 from the
10 series of the Planning, Code Enforcement and Inspections budget to make the requested donation
to the Central Dover Planning Initiative.
The committee recommended approval of staff’s recommendation.
By consent agenda, Mr. Slavin moved for approval of the committee’s recommendation to
authorize the City Manager to transfer $10,000 from the 10 series of the Planning, Code
Enforcement and Inspections budget to make the requested donation to the Central Dover
Planning Initiative. The motion was seconded by Mr. Dixon and carried by a unanimous roll
call vote (Anderson and Hare absent).
Title V Grant Application - Hot Shots (Partnership with Aid in Dover)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reminded
members that since the fall of 2007, the City of Dover had partnered with Aid in Dover to secure
funds through the Criminal Justice Council to provide programming to target at-risk youth. The first
Page 51
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 12
three (3) year cycle funded a program called Girls Circle, which provided after school programming
for at-risk girls in middle school to help improve their self-esteem and reinforce positive life choices.
The second three (3) year cycle funded a program call GAMES (Growing up And Meeting Each
Success), which provided after school programming for boys and girls between the ages of 12 and
18 to help reinforce positive life choices. The current grant request was for a one (1) year grant that
consisted of a basketball program for children between the ages of 12 and 17. The program would
meet one (1) evening per week for three (3) hours and offer two (2) tournaments during the course
of the year.
Mrs. Townshend noted that Aid in Dover had provided two (2) potential grant applications for
consideration, one (1) of which would include the cost of utilizing the John W. Pitts Center as
in-kind match, and the other that included paying the cost of utilizing the John W. Pitts Center out
of the grant request. She summarized the two (2) scenarios for each grant proposal, as follows:
1) Scenario A, in which the City would allow the cost of the John W. Pitts Center as part of the
in-kind match and the program would provide three (3), 12-week sessions, reaching a total of 50
youth; and 2) Scenario B in which the grant funds would pay for the use of the John W. Pitts Center
and the program would provide three (3), 10-week sessions, reaching a total of 30 youth.
Mrs. Townshend explained that the in-kind match provided by the City of Dover under the grant
proposal would be as follows:
1) Finance staff hours for grant administration – 6 hours @ $37.38 per hour
= $224;
2) Parks and Recreation hours for grant administration – 30 hours @ $28.75 per
hour = $862; and
3) John W. Pitts Center Gym usage (Scenario A only) – 113 hours @ $75 per
hour = $8,475
She indicated that staff had concerns about allowing use of the John W. Pitts Center without charge,
since there were many community groups that regularly request use of the facility free of charge and
there was no clear criteria for granting a fee waiver. As such, it was felt that this could create the
impression of unequal or preferential treatment of one (1) group over another.
Staff recommended approval of the grant application for “Scenario B,” where grant funds would pay
for the use of the John W. Pitts Center.
The committee recommended approval of staff’s recommendation.
By consent agenda, Mr. Slavin moved for approval of the committee’s recommendation for
approval of the grant application for "Scenario B," where grant funds would pay for the use
of the John W. Pitts Center. The motion was seconded by Mr. Dixon and carried by a
unanimous roll call vote (Anderson and Hare absent).
Page 52
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 13
Open Forum Speaker Rules - Affirmation of the Three (3) Minute Time Limit and
Establishment of a Rule Against Ceding Time to Another Person
Chairman Lynn noted that it had been City Council’s past practice to allow three (3) minutes for
speakers during the Open Forum segment before each City Council meeting. Recently, several
individuals had requested to cede time to other individuals, which could potentially allow an
individual to speak for the entire 15-minute time allotment for the Open Forum, precluding other
speakers. He suggested affirmation of the three (3) minute time limit and establishment of a rule
against ceding time to another person.
Responding to Mr. Rushe, Mr. Lynn indicated that members would be permitted to suspend the rules
to allow speakers additional time.
In response to concerns of Mrs. Williams, Mr. Lynn suggested that on those occasions when the rules
were suspended to provide a speaker additional time, the Chair would gauge whether there were
other individuals wishing to speak and, if so, members would craft a motion to suspend the rules in
a way that would not preclude other individuals from having the opportunity to speak.
Mrs. Traci McDowell, City Clerk, reminded members that Council is not in official session during
the Open Forum segment of the meeting; therefore, suspension of a time limit would be at the
discretion of the Council President.
As an alternative, Mr. Shevock suggested that if a 15-minute period were allotted and there were six
(6) individuals wishing to speak, an individual who wished to go beyond their three (3) minute
period could be stopped after three (3) minutes. If time remained after all speakers, members could
then allow that individual an additional opportunity to speak. Responding, Mr. Lynn felt that this
suggestion would fall within the purview of the Council President during the Open Forum segment.
Mr. Eshed Alston, 406 Arnold Court, Dover, suggested that the time limit be increased to five (5)
minutes, explaining that if several speakers were requesting additional time, this may be an
indication that enough time was not initially provided to speakers. If five (5) minutes were provided,
he felt that this time limit should not to be exceeded, no proxy use of time should be allowed, and
if time remained at the conclusion of all speakers, an individual could then be provided additional
time to speak.
The committee recommended the affirmation of the three (3) minute time limit for speakers at the
Open Forum segment of the Council Meetings and at the committee level and the establishment of
a rule against ceding time to another person at both the committee level and Open Forum Sessions.
By consent agenda, Mr. Slavin moved for approval of the committee’s recommendation,
seconded by Mr. Dixon and carried by a unanimous roll call vote (Anderson and Hare absent).
Review of Proposed Staff Evaluation Form
During their Regular Meeting of October 10, 2011, City Council requested that staff research and
design a new employee performance evaluation form which would better meet the needs of both the
City and employees. As directed, staff conducted research and designed an Employee Performance
Evaluation, which was provided to members for their review and recommendation.
Page 53
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 14
Mr. Scott Koenig, City Manager, indicated that the proposed evaluation form would be utilized for
all employees, with the exception of sworn police officers. An evaluation would be required for all
employees and would be completed on the anniversary of the employee’s hire date.
Mr. Koenig advised members that all department heads had reviewed the proposed evaluation form
and felt that it was an improvement over what had been previously utilized.
Staff recommended approval of the proposed Employee Performance Evaluation Form.
Responding to Mrs. Williams, Mr. Koenig stated that the evaluation form had not been vetted
through an attorney; however, to his knowledge, no evaluation form had been vetted. He stated that
staff would forward the form to the City Solicitor’s Office for review prior to the Committee’s
recommendation being considered by City Council.
In response to Mr. Perza, Mr. Koenig confirmed that no concerns were relayed by department heads
regarding the use of the proposed evaluation form; however, he stated that there were concerns
regarding the evaluation date requirement such as hire date, end of the budget year, beginning of the
calendar year, etc. He stated that there were a few suggestions from staff and that the evaluation
form was adjusted accordingly.
Council President Bonar relayed appreciation to staff for developing an evaluation form that
provided unanimity among the City’s evaluation procedures.
The committee recommended approval of staff’s recommendation stipulating a favorable review by
the City Solicitor’s Office. (City Clerk’s Office Note: Subsequent to the legal review, Staff revised
the Employee Performance Evaluation Form to include the City Solicitor’s recommendations.)
During the Council Meeting, Mr. Koenig advised members that Deputy City Solicitor Pepper had
suggested amending page 1, Instructions, under the paragraph “Signatures” by adding language, as
follows: “The employee may be subject to discipline for refusing to sign the performance
evaluation”.
Staff recommended approval of the evaluation form with the amendment submitted by Deputy City
Solicitor Pepper.
Mr. Slavin moved for approval of staff’s recommendation to approve the Revised Employee
Performance Evaluation Form (Exhibit #1), seconded by Mr. Dixon and carried by a roll call
vote of six (6) yes (Dixon, Perza, Slavin, Williams, Hutchison, and Bonar), one (1) no (Lynn),
and two (2) (Anderson and Hare).
Mr. Lynn moved for acceptance of the Legislative, Finance, and Administration Committee
Report, seconded by Mr. Slavin and unanimously carried.
Page 54
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 15
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE REPORT -
SEPTEMBER 25, 2013
The Safety Advisory and Transportation Committee met on September 25, 2013 with Chairman
Hutchison presiding.
Dover High School Construction Update
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reminded
members that monthly coordination meetings with the Capital School District (the District) were
continuing and had been very successful, with the next meeting scheduled for September 26, 2013.
The meetings had been attended by representatives of the District, City and State agencies, and
recently included the engineer from the Leander Lakes subdivision project. Mrs. Townshend
reviewed a map depicting the layout of the New Dover High School Project.
Mrs. Townshend reminded members that concerns had been relayed by the District regarding the
availability of funds and the District had indicated a possible need to re-evaluate whether they could
construct the east entrance, as previously planned. She stated that last week she had attended a
meeting of the Capital School Board where an update on school construction was provided by EDiS,
the building contractor, and ABHA, the architect. Mrs. Townshend stated that the site plan had been
approved, a request for a parking reduction had been submitted, and a public hearing had been
scheduled for the Planning Commission on October 21, 2013. She indicated that the plan was to
reserve areas for parking in the future rather than build the parking lots at this time. In addition,
EDIS and ABHA would be providing an overview of the project similar to that provided to the
Capital School Board last week. She noted that there were several issues that the District wished to
present for possible revisions that would help to reduce costs, such as the number of tennis courts,
seating capacity in the stadium, etc.
Mrs. Townshend stated that the issue of greatest interest to the City was the east entrance to the
school and she assured members that the District was aware of the City’s concerns regarding this
matter. Should the District wish to eliminate the east entrance, she stated that they would be required
to submit the request to the Planning Commission for a public hearing. At this time, there was no
indication that the District would not move forward with construction of the east entrance. She
assured members that staff would meet with the Delaware Department of Transportation (DelDOT)
to discuss the functionality of the intersection and reminded members that the City had discussed the
possibility of revisiting the entrance design to be reduced to “right in/right out.”
Mrs. Townshend stated that all other construction on site was proceeding as planned. She stated that
she would advise members of the action taken by the Planning Commission when they consider the
parking request during their meeting in October.
Mr. Davis noted that the east entrance was planned to accommodate bus traffic and that the west
entrance was planned to accommodate vehicular traffic. According to a recent newspaper article,
he stated that the road on the west entrance was augmented as a necessity by DelDOT, which is why
the monies were not available for the east entrance. Responding, Mrs. Townshend stated that
Leander Lakes submitted the apartment complex site plan before the new high school plan was
submitted; however, due to the economy, construction by Leander Lakes slowed. To her
recollection, the roadway was originally planned to be a 24’ - 26’ wide City street. With the addition
Page 55
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 16
of the school project, there was discussion as to how the road would be redesigned, and the initial
conceptual design of the road by Leander Lakes did not meet the needs to serve both properties. As
a result, the design of the roadway was widened in order to serve both properties. She noted that
there were additional concerns regarding the connection to Tribbitt Street and connecting through
Cannon Mill. As a result, it was decided to bring the connector road all the way through to
Hazlettville Road, and, at that time, it was determined that the road would serve as a regional
connector road. As such, it then became a DelDOT road which would be built to DelDOT standards.
She was not aware of the cost difference between construction as a DelDOT road versus a City road.
Responding to Mr. Davis, Mrs. Townshend explained that after the connector road was determined
to be a DelDOT road, the District entered into an agreement which specified that the District would
be responsible for designing and building the entrance and the road down to the school’s points of
access, and Leander Lakes would pay for the additional section of the road. According to the
agreement, construction must be complete by May 2014. The design, as prepared by Landmark
Engineering, the engineers for Leander Lakes, had been submitted to DelDOT, who had submitted
comments. The intent was to have the design finalized by the end of the year in order for
construction to begin shortly after the first of the year. In addition, Mrs. Townshend noted that
DelDOT was responsible for the design and installation of the HAWK signal and was paying for
approximately $700,000 in sidewalk improvements on the north side of Route 8. Therefore, she
assured members that DelDOT had a share of the responsibilities for the completion of this project.
Ms. Karen Nickerson, 24 Stoney Drive, Heatherfield, requested additional information regarding the
road that would travel through Cannon Mills. She relayed concerns that such a road would provide
additional traffic on Route 8. Responding, Mrs. Townshend explained that the intent was for the
road to improve traffic conditions. She stated that staff’s concern, and the reason that the
interconnection was urged, was that there were over 900 units in both Cannon Mill and Village of
Westover, with several of these units containing children who would attend the new school. She
explained that it was assumed that some of these children would drive to school rather than walk,
and without the interconnection it would be necessary for them to utilize Hazlettville Road, either
Artis Drive or Mifflin Road, and Route 8 in order to access the school. She stated that since the road
would not be a direct route through the subdivision, it was not anticipated that it would be utilized
as a “pass through,” like Mifflin Road and Artis Drive.
Ms. Nickerson explained her concern regarding the current difficulty in leaving the subdivision due
to traffic. Residents were previously advised that the traffic signal at Mifflin Road would help;
however, she stated that this had not provided relief. Responding, Mrs. Townshend noted that an
additional traffic signal would be installed and, with signal timing, she felt that those concerns would
be addressed.
In response to Mr. Keller regarding whether current traffic information was analyzed, it was
Mrs. Townshend’s recollection that DelDOT utilized information from the 2008 Route 8 Study in
reviewing the traffic plan. Mr. Mark Luszcz, representative of DelDOT, stated that a report was
received in 2011 from the District’s engineer which included a justification for the proposed traffic
signal at the west entrance and that this report would have contained updated traffic counts.
Page 56
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 17
Mr. Les Blakeman, 209 Falmouth Way, Cranberry Run, questioned if the roadway extension would
eventually travel to Hazlettville Road. Responding, Mrs. Townshend stated that although this
continued to be a part of the plan, it had not been “pushed out” by DelDOT and there was no funding
associated with this project. In addition, she stated that the property owner did not necessarily want
to sell the right-of-way; therefore, there were several obstacles that would need to be overcome
before the extension could come to fruition.
Mr. Ray Paylor, 10 Yarmouth Way, Cranberry Run, stated that his property was located directly
across from the new Dover High School. He questioned if there was an estimated date for the
construction of the apartment complex by Leander Lakes. Responding, Mrs. Townshend stated that
the City recently received comments from the Kent Conservation District relating to the stormwater
review for the project. At the current pace, she estimated that construction would begin in a year.
No further action was taken.
Presentation on the High-Intensity Activated crossWalK (HAWK) Signal (Delaware
Department of Transportation)
Mr. Mark Luszcz, Chief Traffic Engineer for the Delaware Department of Transportation (DelDOT),
and Mr. Steve Brown, Project Development - Road Design for DelDOT, introduced themselves and
reviewed a Presentation - Route 8 & Heatherfield Way: Pedestrian Hybrid Beacon. Mr. Luszcz
explained that the traffic control device known as the HAWK, (High-intensity Activated crossWalK)
is officially called a Pedestrian Hybrid Beacon. He indicated that the device was not a full traffic
signal nor a beacon, which would be a constant flashing yellow light or a red signal ahead when
flashing, but served as a hybrid of these two (2) devices.
Mr. Luszcz indicated that the HAWK is used to safely control pedestrian and vehicular traffic in
locations where there is a moderate to high volume of both pedestrians and vehicles in instances
where a full traffic signal is not justified. He stated that many years of research had been performed
to determine when a full operating traffic signal should be utilized. He explained that when a full
traffic signal is utilized but not justified (based on certain criteria), negative results occur, such as
accidents, unacceptable and unnecessary delays, etc. He stated that, according to the analyses of the
Capital School District (the District) and DelDOT, based on the traffic and expected pedestrian
volume criteria, a full traffic signal was not warranted at the east entrance of the new Dover High
School (the school) at this time; however, a full traffic signal was warranted at the west entrance.
He noted that the criteria could change in the future.
Mr. Luszcz explained that the HAWK signal would be installed at the intersection of Route 8 and
Heatherfield Way, near the proposed east entrance of the school, which was scheduled to open in the
Fall of 2014. He explained that a HAWK signal would remain normally dark for vehicular traffic
and is activated when a pedestrian presses the activation button, much like at a crosswalk at a regular
traffic signal. He stated that, once activated, the HAWK signal goes through stages to stop traffic
long enough for the pedestrian to safely cross the street. Once the pedestrian crosses, traffic resumes
as normal and the HAWK signal resets itself for future activation. Members reviewed a video
depicting proper and improper use of a HAWK signal located in Newark.
Page 57
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 18
Referring to the video, Mr. Brett Martine, Traffic Engineer with DelDOT, suggested the possibility
of placing an article in a local newspaper and including some type of narrative to the presentation
to provide an explanation on proper utilization of the HAWK signal. Mr. Luszcz offered to take
whatever action necessary to inform the public, indicating that DelDOT took extensive measures
with public outreach in Newark when the signal was installed; however, there was no cooperation
with the media, explaining that a press conference was held and no one attended, nor was there
newspaper coverage of any kind regarding the information.
Mr. Jeff Brown of the Dover Post offered to include a link on the newspaper’s website directing the
public to DelDOT to obtain information on the HAWK signal.
In response to Mr. Perza regarding whether any special legislation should be enacted in relation to
the HAWK signal since there was no other such device being utilized in Delaware with the exception
of Newark, Mr. Luszcz suggested that this be discussed with the Dover Police Department. If the
City were to request some type of legislation to address violations in connection with the device,
DelDOT could offer assistance. In addition, Mrs. Townshend suggested that the District become
involved and introduce students to the device and how it functions.
Ms. Ann Alexander, 15 Stoney Drive, Heatherfield, suggested the possibility of using a camera at
the intersection. Responding, Mr. Luszcz stated that cameras installed for red light enforcement are
placed in locations based on a very regimented, State-wide, data-driven prioritization system (based
on accidents, etc.). He stated that DelDOT utilizes traffic monitoring cameras, which are not
recorded, and that surveillance cameras were not installed by DelDOT. Mrs. Townshend confirmed
that the City had installed surveillance cameras in the downtown area.
Responding to Mr. Les Blakeman, 209 Falmouth Way, Cranberry Run, regarding concerns of
out-of-town visitors, particularly during NASCAR weekend, Mr. Luszcz assured members that
message boards, as well as permanent signage, would be erected to notify drivers of the new signal.
Consideration would be given to erecting message boards specifically for race weekend.
In response to Mr. Davis, Mr. Luszcz advised members that the portion of Route 8 adjacent to the
school was not considered a “school zone;” therefore, no signage would be erected indicating such,
nor would there be a reduction in speed limit. He stated that there was no evidence that drivers react
to speed limit signs, explaining that traffic does not change speed based on the speed limit but rather
the surrounding environment (main arterial road, rural area, vacant land, etc.). Should the area
develop and traffic increase, this would adjust the speed of traffic in the area. Mr. Davis suggested
that this matter be further considered by the Committee in the future, noting his opinion that this
portion of Route 8 should be a designated school zone.
Mr. Perza referred to other areas in the City where crossing guards control the traffic signal, allowing
pedestrians to cross roadways, and questioned if the HAWK signal could be used in a similar
manner. Responding, Mr. Luszcz stated opposition, explaining that DelDOT was making a
concerted effort in New Castle County to eliminate the use of crossing guards for controlling traffic
signals, with plans for elimination throughout the State. Noting that crossing guards “do a great
job,” he indicated that they are not professionally trained and that they actually cause more safety
and operational problems than they solve.
Page 58
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 19
Responding to Mr. Perza, Mr. Luszcz stated that the HAWK signal had been designed so that it
could potentially be converted to a full traffic signal if it met that justification, based on a future
traffic study. He explained that the current actions being taken were based on projected pedestrian
and vehicular traffic numbers. Mr. Luszcz indicated that it would be the State’s financial
responsibility to make such changes in the future. He felt confident that the school, City, and State,
would be monitoring the intersections and if there were significant issues, DelDOT staff would
conduct an updated traffic study.
Ms. Karen Nickerson, 24 Stoney Drive, Heatherfield, relayed concern that the children living in
Cranberry Run who were attending school would not walk down to Heatherfield East to cross over
to the school. Responding, Mr. Luszcz stated that Route 8 should not be crossed without the
assistance of a traffic signal; however, DelDOT had no control over the actions individuals would
take in this regard.
At the request of Mrs. Townshend, Mr. Bruce Ashby, Transportation Supervisor for the District,
stated that it was anticipated that the students residing in Cranberry Run, Heatherfield, and off Route
8 down to the traffic signal at Dover-Kenton Road, such as the apartments in the area, Mallard Pond,
etc. would be walking to school. It had been estimated that this would consist of approximately 100
students.
Responding to Mrs. Townshend, Mr. Luszcz stated that a crosswalk at the west entrance was not
currently in the plans. Noting that there were no sidewalks, Mrs. Townshend questioned if there
would be more compliance with using the signals to cross Route 8, particularly for those students
who reside in Cranberry Run, if they could cross at the west entrance. Mr. Ashby indicated that it
would be a shorter distance for students from Cranberry Run to walk to the east intersection than the
west intersection.
Mr. Martine stated that, in addition to working for DelDOT, he also served as the President of the
Cranberry Run Homeowners Association. He advised members that since sidewalk had not been
installed all the way down to the west intersection, it was anticipated that the students would do
some type of diagonal crossing. He felt that consideration of any type of connection down to the
west entrance may be more accommodating than to have a “backtrack” situation. Responding,
Mr. Luszcz felt that, although it would not be difficult to retrofit the west entrance to include a
crosswalk, it was not currently included in the plans.
Mr. Steve Brown advised members that DelDOT was currently tasked to install sidewalks only from
Marsh Creek connecting to the existing sidewalk in Heatherfield and then on the west side of Stoney
Drive to Cranberry Run. He stated that a five-foot (5’) sidewalk, hugging the curb, would be
installed, weaving in and out for mailboxes and utility poles. He stated that DelDOT was tasked to
have these sidewalks installed in order to get students safely from those developments to the HAWK
signal.
Mr. Blakeman referred to an “S” shaped sidewalk from Route 8 to the front door of the school,
which he felt would encourage students to cross at the appropriate location. Responding,
Mrs. Townshend stated that this sidewalk had not yet been constructed and suggested that it be
re-evaluated.
Page 59
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 20
Mr. Perza noted that Delaware State University had a wall erected across their facility along
Route 13 and questioned the possibility of erecting a wall or fence to deter students from crossing
Route 8.
In response to Ms. Alexander’s concerns regarding the traffic flow in the area, Mrs. Townshend
stated that the entire function of the west intersection would be evaluated.
Responding to Ms. Dorothy Adams, 102 Falmouth Way, Cranberry Run, Mr. Luszcz stated that a
presentation and a mock demonstration of the HAWK signal had been provided to students in
Newark and he offered to do the same or similar for the students at the new High School.
Ms. Adams advised members that there was not a right turn lane into Cranberry Run, noting that
there was a lane present but that there was a white line which discouraged crossing. When turning
into Cranberry Run, she stated that vehicles pass using the lane for oncoming traffic. She relayed
concern that this may cause a bad accident and questioned the possibility of a turn lane being
installed. Responding, Mr. Martine, indicated his opinion that the recent street resurfacing in front
the subdivision, provided a great opportunity for the addition of a turn lane. However, he explained
that the guidelines for a turn lane stipulate the accommodation for a bike lane as well, and with the
additional 4 foot bike lane, the roadway in front of Cranberry Run was 1 foot, 6 inches shy of the
correct layout. He stated that, after examining the matter, the only recommendation was to possibly
increase the shoulder from 8.5 feet. He stated that there was a 12 foot gore area (the yellow marking
in the center of the roadway), which provides a neutral space for vehicles traveling west to pass
turning vehicles, but he highly recommended that all motorists use the shoulder when turning into
the subdivision, to allow vehicles to pass.
In response to concerns of Mr. Sam Adams, 102 Falmouth Way, Cranberry Run, Mr. Luszcz
indicated that when there is a single white line, vehicles are discouraged from crossing over;
however, it is permitted. He explained that when there is a double white line, vehicles are prohibited
from crossing over.
Mr. Ray Paylor, 10 Yarmouth Way, Cranberry Run, advised members of an incident whereby he was
given a warning by a Camden Police Officer for making a right turn from the shoulder, explaining
that there was a vehicle in front of him stopped to make a left and he wanted to make a right, so he
went around the vehicle on the shoulder and turned. Responding, Mr. Martine could not explain the
Police Officer’s position since there was only one (1) vehicle being “passed,” explaining that if more
than one (1) vehicle had been passed and the shoulder was used to advance, he would better
understand the situation. He assured members that, in accordance with the governing publications
utilized by traffic engineers, such a movement is legal. He again encouraged the use of the shoulder
for residents turning into Cranberry Run.
Mrs. Townshend personally thanked Mr. Luszcz, Mr. Brown, and Mr. Jim Satterfield from DelDOT
for all of their work and diligence in working with the City and the District on this project.
Mr. Perza thanked everyone for their participation at this meeting.
No further action was taken.
Page 60
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 21
By consent agenda, Mr. Slavin moved for acceptance of the Safety Advisory and
Transportation Committee Report, seconded by Mr. Dixon and carried by a unanimous roll
call vote (Anderson and Hare absent).
MONTHLY REPORTS - AUGUST 2013
By motion of Mr. Slavin, seconded by Mr. Dixon, the following monthly reports were accepted
by consent agenda:
Budget Report
Chief of Police Report
City Assessor Report
City Manager's Report
City Planner’s Report
Economic Development
ANNEXATION/REZONING REQUEST/FIRST READING (ORDINANCE #2013-16) - 508
ACORN LANE, OWNED BY RUAL M. JUAREZ
A request was received for annexation and rezoning of property located at 508 Acorn Lane,
consisting of two (2) parcels totaling 2.45+/- acres (Parcel No. 1: located on the westerly side of
Acorn Lane, containing 1.315+/- acres; and Parcel No. 2: located on the easterly side of Acorn Lane,
containing 1.135+/- acres), owned by Raul M. Juarez. The property is currently zoned RS-1 - Single
Family Residence (Kent County zoning classification) and the proposed zoning is R-8 - One-Family
Residence (City of Dover zoning classification).
Staff recommended that the request be referred to the Utility Committee on October 28, 2013; the
Planning Commission on November 18, 2013; and that a public hearing be set for December 9, 2013
at 7:30 p.m.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that the property is an enclave, surrounded by City of Dover property, and is bisected by Acorn Lane,
with a house located on the east side and the west side vacant.
Mrs. Williams moved for referral, as recommended, seconded by Mr. Slavin and unanimously
carried.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
proposed Ordinance, as read by the City Clerk by title only, as follows:
ORDINANCE #2013-16 AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 508 ACORN LANE
Page 61
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 22
ANNEXATION/REZONING REQUEST/FIRST READING (ORDINANCE #2013-17) -
PROPERTY LOCATED ON THE WESTERLY SIDE OF ACORN LANE, OWNED BY THE
CITY OF DOVER
A request was received for annexation and rezoning of property located on the westerly side of
Acorn Lane, consisting of 0.075+/- acres (3,264 s.f.), owned by the City of Dover. The property is
currently zoned RS-1 - Single Family Residence (Kent County zoning classification) and the
proposed zoning is R-8 - One-Family Residence (City of Dover zoning classification). Staff
recommended that the request be referred to the Utility Committee on October 28, 2013 and to the
Planning Commission on November 18, 2013; and that a public hearing be set for December 9, 2013
at 7:30 p.m. (TAX PARCEL ED-00-068.15-01-12.00-000; PLANNING REFERENCE AX-13-03; COUNCIL
DISTRICT 3).
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that the property is a very small piece of property that was identified when the annexation request
for 508 Acorn Lane was received (see previous agenda item). She stated that the property is
contiguous to other property owned by City of Dover that is within the City limits. In an effort to
fill-in the enclaves, Staff felt that this property should also be annexed.
Mr. Slavin moved for referral, as recommended, seconded by Mrs. Williams and unanimously
carried.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
proposed Ordinance, as read by the City Clerk by title only, as follows:
ORDINANCE #2013-17 AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
ON THE WEST SIDE OF ACORN LANE.
COUNCIL MEMBERS ANNOUNCEMENTS
Mrs. Williams thanked the anonymous donor for the cupcakes provided for her birthday and invited
anyone wishing to participate after the meeting, to join her in the Caucus Room for a cupcake.
Council President Bonar wished Mrs. Williams a happy birthday (October 6th) and an early birthday
wish to Mayor Carey (October 27th).
By unanimous consent, the meeting adjourned at 8:20 p.m.
TRACI A. McDOWELL
CITY CLERK
Page 62
CITY COUNCIL MEETING OF OCTOBER 14, 2013 PAGE 23
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
October 14, 2013, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM/jg
S:\AGENDAS-MINUTES-PACKETS\Council-Minutes\2013\10-14-2013.wpd
Exhibit
Exhibit #1 - Employee Performance Evaluation Form, as amended
Page 63
EXHIBIT #1
Employee’s Name: Regular Council Meeting of 10/14/2013
Title:
Supervisor:
Review Period
Instructions for the Employee Performance Evaluation
September 2013
• Annual reviews are required for all employees and shall be completed on the anniversary of the employee’s hire date.
• Before conducting a performance evaluation, a supervisor must give an employee a reasonable time to demonstrate performance.
• A supervisor shall arrange to meet with the employee to discuss the employee’s evaluation no later than 30 days after the anniversary
of the employee’s hire date.
COMPLETING THE EMPLOYEE PERFORMANCE EVALUATION
PART 1: Core Competencies
This section is to include comments on the degree and qualities of the results achieved and note any extenuating circumstances affecting the
results regarding the employee’s performance. It is important to evaluate and discuss the employee’s overall job performance and provide
specific details and examples of exceptional performance as well as any areas needing improvement. It is necessary to provide a development
plan to improve performance if deficiencies are noted. List any specific activities the employee can accomplish within the next year as part of
their professional development plan.
This section of the evaluation is not scored.
PART 2: Performance Competencies
Each employee shall be evaluated on all the Performance Competencies in Part II with the exception of categories that do not pertain to that
specific employee. That category would be scored as New/Not Applicable, (example: Question #11 will not pertain to all employees as it is
directed towards a supervisor) and not count in the employee’s overall scoring.
Total the scores awarded for each performance competencies. Divide the total by the number of performance competencies graded. Place
the score in the Scoring Table for Part II.
Review with the Employee
The supervisor shall meet with the employee to discuss and review the evaluation. The supervisor shall provide a copy of the completed
evaluation at a minimum of two days prior to the meeting to the employee. This will allow the employee an opportunity to review the
evaluation prior to the meeting. During the review, the individual’s performance, strengths, and developmental needs are to be discussed.
Signatures
The employee and the supervisor are required to sign the evaluation once it has been reviewed together. The employee may be subject to
discipline for refusing to sign the performance evaluation. The employee and supervisor may attach an addendum. The evaluation shall be
presented to the Department Head for review and signature. The Department Head shall then forward the evaluation to the Human Resources
Director.
A copy of the evaluation is to be provided to the employee. The employee shall be informed that the evaluation will be placed in the
employee’s personnel file maintained in the Human Resources Department. Evaluations become a permanent record in the employee’s file.
Page 64
Employee’s Name:
Title:
Supervisor:
Employee Performance Evaluation Review Period:
Employee Performance Evaluation
Part I Core Competencies
1. Evaluate and discuss the employee’s overall job performance during the review period. Provide specific
examples.
2. Provide any examples of exceptional performance.
3. For any areas needing improvement, provide examples and develop a plan to improve performance.
4. State and discuss the expectations and goals for the upcoming review period. Goals are to be S.M.A.R.T.
(specific, measurable, attainable, realistically high, and target dated).
5. List specific activities the employee can accomplish within the upcoming review period as part of their
professional development plan.
2
Page 65
Employee’s Name:
Title:
Supervisor:
Employee Performance Evaluation Review Period:
Part II Performance Competencies
(Depending on position, some competencies may be more relevant than others)
Distinguished Contributor: Effects measurable and lasting improvements in
organizational performance.
Performance Improver: Contributes more than effective performance of
essential functions and enhances the performance
Distinguished Contributor Performance Improver Improving Contributor
self and others requirements.
Valued Contributor Non-Contributor
Valued Contributor: Performs essential functions of the job
Effectively.
Improving Contributor: Learning the essential functions of the job, or
improving toward effective performance of all
essential.
Non-Contributor: Not able or willing to perform the essential
functions of the job.
New/Not Applicable: Not applicable or new would be a new employee or a
specific task that does not apply to a particular
person.
Example: Displays fairness toward all subordinates. NA
Example: Displays fairness toward all subordinates. 5
1. Skill and proficiency in carrying out duties and assignments
Comments:
2. Possesses skills and knowledge to perform the job competently
Comments:
3. Skill at planning, organizing and prioritizing workload (For self and direct
reports, if applicable)
Comments:
4. Holds self accountable for assigned responsibilities, sees tasks through to
completion in a timely manner
Comments:
5. Proficiency at improving work methods and procedures as a means toward
greater efficiency
Comments:
6. Communicates effectively with supervisor, coworkers, and staff
Comments:
7. Ability to work independently
Comments:
8. Willingness to take on additional responsibilities
Comments:
9. Reliability (attendance, punctuality, meeting deadlines)
Comments:
3
Page 66
Employee’s Name:
Title:
Supervisor:
Employee Performance Evaluation Review Period:
Distinguished Contributor: Effects measurable and lasting improvements in
organizational performance.
Distinguished Contributor
Performance Improver: Contributes more than effective performance of
Performance Improver Valued Contributor Improving Contributor
essential functions and enhances the performance
Non-Contributor
self and others requirements.
Valued Contributor: Performs all essential functions of the job
Effectively.
Improving Contributor: Learning the essential functions of the job, or
improving toward effective performance of all
essential.
Non-Contributor: Not able or willing to perform the essential
functions of the job.
New/Not Applicable: Not applicable or new would be a new employee or a
specific task that does not apply to a particular
person.
10. Proficiency at analyzing facts, problem solving, decision-making, and
demonstrating good judgment
Comments:
11. Displays fairness towards all subordinates
Comments:
12. Assists employees with skills development or enhancement
Comments:
13. Delegates responsibility where appropriate
Comments:
14. Takes timely and appropriate corrective/disciplinary action with employees
Comments:
15. Observes proper workplace and job site safety rules and ensures employees
follow proper safety guidelines
Comments:
16. Takes specific steps to create and develop the workforce and promote a
team based environment
Comments:
17. Displays a positive attitude toward career
Comments:
18. Exercises common sense and discretion when required
Comments:
19. Can be trusted with sensitive information
Comments:
20. Uses critical thinking in stressful situations
Comments:
4
Page 67
Employee’s Name:
Title:
Supervisor:
Employee Performance Evaluation Review Period:
Scoring Table
Core Competencies (Part I) are not rated. Total the points earned for questions in Part II and place scores in
the appropriate column and multiply by the total number of applicable items scored.
Factors Scored Total Score Per Section
Part I Core Competencies, Questions 1- 5 Not Scored
Part II Questions 1 - 20
Total Score in Part II/ Number of Scored
Performance Competencies
Performance Rating Definitions
Distinguished
5 Effects measurable and lasting improvements in organizational performance.
Contributor
Contributes more than effective performance of essential functions and enhances the
4 Performance Improver
performance of self and others.
3 Valued Contributor Performs all essential functions of the job effectively.
Learning the essential functions of the job, or improving toward effective performance of
2 Improving Contributor
all essential functions.
1 Non-contributor Not able or willing to perform the essential functions of the job & unacceptable.
5
Page 68
Employee’s Name:
Title:
Supervisor:
Employee Performance Evaluation Review Period:
Signatures
The employee and the evaluator are required to sign in the space below after they have reviewed the evaluation. The
employee’s signature does not necessarily indicate agreement with the evaluation. Any written comments made by the
employee must be attached. The Performance Evaluation will be placed in the employee’s official personnel file. A copy is
to be provided to the employee.
Employee: I have had this evaluation explained to me.
I agree with this evaluation.
I do not agree with this evaluation.
I wish to appeal this evaluation.
I have attached an addendum to this evaluation.
_______________________
Signature of Employee Date
Evaluator: I have explained this evaluation to the employee and attest that the information contained herein
represents my best judgment of the employee’s performance.
I have attached an addendum to this evaluation.
___________________________________________________________________ _________________________
Signature of Evaluator Date
___________________________________________________________________ _________________________
Signature of Department Head Date
Employee Performance Evaluation September 2013
6
Page 69
ACTION FORM
PROCEEDING: City Council
DEPARTMENT OF ORIGIN: Planning & Inspections DATE SUBMITTED: October 21, 2013
PREPARED BY: Ann Marie Townshend, AICP, Director of Planning and Community Development
SUBJECT: 24 N New Street, Dover, Delaware – Violation of Dangerous Building Ordinance
REFERENCE: Chapter 22, Article XI – Dangerous Buildings, Sec. 22-385 - Hearing before Council, sec. 22-288 –
Emergency Cases, and Chapter 22, Article XI - Dangerous Buildings Case # 13-3531 & 2279
RELATED PROJECT: N/A
APPROVALS: N/A
EXHIBITS: PowerPoint Presentation and File Photos to be presented at the Council meeting.
EXPENDITURE REQUIRED: Preliminary estimate is $20,000 $25,000.
AMOUNT BUDGETED: $150,000 Budgeted for all demolitions Citywide in the FY-2013 Budget; As of October 21,
2013 there is $21,113.50 remaining in the line item.
FUNDING SOURCE (Dept./Page in CIP & Budget): 110-1600-534-30-33.
TIMETABLE: As soon as possible.
RECOMMENDED ACTION:
1. Declare this building and all accessory structures on this property dangerous.
2. Order the property demolished immediately by the owner or equity owner at their own risk.
3. Order the Building Inspector to cause the demolition of the structure if not completed by the owner by October
30, 2013.
4. Order the City Manager with the assistance of the City Solicitor to cause the cost of demolition to be charged
against the land on which the building exists as a municipal lien or cause such cost to be added to the tax
duplicate as an assessment, or to be levied as a special tax, or to be recovered in a suit at law against the owner.
BACKGROUND AND ANALYSIS
The property is owned by the Estate of Mary Bessie Brokenbrough. The property is a two-story wood-framed single
family home. The house was condemned on October 8, 2013 due to insanitary conditions within the home and to the
degree of structural damage caused by numerous water leaks. The house is stacked from floor to ceiling with belongings,
creating concerns about the weight on the structure and fire hazard. City crews boarded the structure and have re-boarded
on several instances due to people removing the boards and accessing the house. On Friday, October 18th, City inspectors
found the house unsecured and boarded the house to secure it. On Saturday, October 19th, a City contractor boarded the
house and secured the windows after the Police Department apprehended suspects burglarizing the house on the evening
of October 18th. Currently, there are no utilities with numerous code violations that exist on the property. Due to the
chronic nature of people accessing the house and the challenges with keeping the property secure, as well as the fire
hazard and structural concerns with the structure, staff is bringing this forward as an emergency case, requiring immediate
action.
Page 70
ACTION FORM
PROCEEDING: City Council
DEPARTMENT OF ORIGIN: Planning & Inspections DATE SUBMITTED: October 18, 2013
PREPARED BY: Ann Marie Townshend, AICP, Director of Planning and Community Development
SUBJECT: 142 Brandywine Drive, Dover, Delaware – Violation of Dangerous Building Ordinance
REFERENCE: Chapter 22, Article XI – Dangerous Buildings, Sec. 22-385 - Hearing before Council and Chapter 22,
Article XI - Dangerous Buildings Case # 13-2220 & 13-2627
RELATED PROJECT: N/A
APPROVALS: N/A
EXHIBITS: PowerPoint Presentation and File Photos to be presented at the Council meeting.
EXPENDITURE REQUIRED: Preliminary estimate is $15,000 - $20,000.
AMOUNT BUDGETED: $150,000 Budgeted for all demolitions Citywide in the FY-2013 Budget; As of October 18,
2013, there is $25,893.50 remaining in the line item.
FUNDING SOURCE (Dept./Page in CIP & Budget): 110-1600-534-30-33.
TIMETABLE: As soon as possible.
RECOMMENDED ACTION:
1. Declare this building and all accessory structures on this property dangerous.
2. Order the property repaired or demolished by November 28, 2013 by the owner or equity owner at their own
risk.
3. Order the Building Inspector to cause the repair or demolition of the structures if not completed by the owner
within 10 days of the date established by City Council.
4. Order the City Manager with the assistance of the City Solicitor to cause the cost of repairs or demolition to be
charged against the land on which the building exists as a municipal lien or cause such cost to be added to the tax
duplicate as an assessment, or to be levied as a special tax, or to be recovered in a suit at law against the owner.
BACKGROUND AND ANALYSIS
The property is owned by the Veterans Administration. The property is a two-story wood-framed single family home
with a full basement. The house has been vacant since April of 2010 when the electric was terminated. Since then, the
basement has been flooded by water due to the sump-pump not being able to operate. This has caused the basement level
to become filled with mold and mildew and is causing water damage to the floors and walls of the home. Also the pool
in the rear yard is covered but has stagnant water on the tarp. There are numerous code violations that exist on the
property.
Page 71
PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE
The Parks, Recreation, and Community Enhancement Committee Meeting was held on
October 14, 2013, at 3:33 p.m. with Chairman Dixon presiding. Members present were
Mr. Hutchison, Mr. Perza, Mr. Caldwell, and Mrs. Horsey (arrived at 3:44 p.m.). Mayor Carey was also
present (arrived at 3:35 p.m.).
AGENDA ADDITIONS/DELETIONS
By unanimous consent, the agenda was approved as presented.
Future Use of the Dover Park Recreation Center
During the Committee Meeting of July 8, 2013, members recommended approval of staff’s
recommendation to demolish the recreation center at Dover Park. Since that meeting, several
members of the community relayed opposition to the demolition, as recommended by the Committee
(Attachment #1). As a result, when the Committee’s recommendation was presented to City Council
during their meeting of July 22, 2013, members of City Council referred the matter back to the
Committee to allow staff time to research methodologies for funding repair or replacement or finding
a public/private partnership to keep the recreation center in operation.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reminded
members that since the opening of the John W. Pitts Center in April 2008, the demand for use of the
recreation center at Dover Park declined and that, while the City continued to rent the Dover Park
recreation center for parties, the Pitts Center became the primary focus of the City’s recreation
programming. She explained that the recreation center no longer serves the purposes of the City’s
recreation programming and noted that the programs that were scheduled for the Dover Park
recreation center were frequently cancelled due to low attendance.
Mrs. Townshend advised members that the building was constructed in 1974 and that it needed
investment to maintain functionality. She stated that the City had discontinued rental of the building
and that the FY2013 budget included $30,000 in the Capital Improvement Plan (CIP) to replace the
roof of the building, explaining that the roof had routinely been patched to repair leaks.
Mrs. Townshend indicated that, during FY2013, there was discussion about potentially renting the
building out to a non-profit organization. Before investing funds to replace the roof and pursuing
the potential of leasing the building to a non-profit organization, staff felt it was important to do a
full assessment of the building to determine what other investments would be necessary to make the
building functional, as all of the building's systems were dated and in need of some update. As a
result, she stated that Compliance Environmental, Inc., was retained to do a Building Condition
Survey. Members were provided a copy of the "Report of Findings from a Building Condition
Survey" dated May 6, 2013, which included a summary of the recommended repairs, as well as cost
estimates totaling $110,475. Although the Building Condition Survey did not include a structural
engineering report, should City Council wish to keep the building and renovate it, staff would
recommend that a structural engineering report be obtained prior to any renovations. However,
based on the information contained in the Building Condition Survey, staff recommended demolition
of the structure and noted that the costs associated with demolition, estimated at $20,000 for asbestos
removal and $30,000 for demolition (bids would require City Council approval), were not currently
budgeted.
Page 72
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 2
Mrs. Townshend reviewed a Presentation - Future Use of Dover Park Recreation center
(Attachment #2). Having received concerns from the community regarding the recommendation for
demolition, she stated that staff’s alternative recommendation was for the City to hire a consultant
to do a Parks and Recreation System Plan for the City, which would include the Dover Park. She
explained that the Plan would address indoor and outdoor recreation needs and guide investment in
the City’s parks to help meet system-wide needs. In addition, the Plan would make
recommendations on building partnerships to meet the City’s recreation needs. As an interim plan,
Mrs. Townshend recommended performing maintenance and minimal repairs to the building;
making the building available for rentals and for programming; utilizing partners to provide
programming; and, allowing the building to be open only for scheduled events or programming.
Responding to Mr. Hutchison, Mrs. Townshend stated that the repairs indicated in Table 1 of the
Executive Summary of Building Condition Survey do not include any ADA requirements and that
significant renovations would be necessary to provide restrooms that are handicapped accessible.
Although such requirements may not be required by Code, she felt that if the City opted to maintain
the facility, it would need to be made accessible to any and everyone. She advised members that one
of the main concerns relayed by the public was the accessibility of the City’s parks. It was her
opinion that to include ADA Standards in the repairs recommended, the costs would be between
$175,000 and $200,000.
Ms. Dolores Blackman, 7 Starboard Court, questioned the security of the City’s buildings, feeling
that if people felt safe, they would use the facilities more often. Responding, Mr. Scott Koenig,
City Manager, indicated that the Police Department monitors all City parks; however, they are not
provided a schedule for the use of the parks. Ms. Blackman felt it was imperative for the City to
provide security and questioned the possibility of an entry gate being installed to limit individuals
from accessing the area during certain hours. Responding, Mr. Koenig stated that there is a gate
beyond the building which limits access to the park (open space), noting that such gates are installed
at all open space parks; however, he felt that a gate could also be installed closer to the roadway,
prohibiting access to the building during certain times.
Mr. Reuben Salters, 109 Bertrand Drive, noted that it costs the City to provide recreation on the west
side of Dover and that there are also taxpayers residing on the east side of the City. It was his feeling
that the City should not let monetary issues prohibit providing recreation to all resident of the City.
Mr. Salters suggested that members consider the human value in this regard, particularly for the
youth, and indicated confidence in the State providing funding assistance for recreational
programming. He advised members that a petition opposing the demolition of the Dover Park
recreation center was submitted (as on file in the Office of the City Clerk).
Mr. James Fogell, 360 Nimitz Road, advised members that Manchester Square was not in existence
when the Dover Park recreation center was constructed and that it was originally planned to serve
senior citizens. He relayed opposition to the demolition of the building and explained the
importance of the City maintaining such assets. Mr. Fogell also noted that the buildings’ availability
for rent had never been advertised. He advised members that he visits the City's parks regularly and
urged members not to demolish the Dover Park recreation center.
Page 73
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 3
Responding to Mr. Perza, Mrs. Townshend stated that, at some point in time the City made Schutte
Park the number one priority for recreation investment and, in doing so, attention was not paid to
other recreation assets. She advised members that the City has been very proactive with the
City-wide playground replacement program, upgrading equipment throughout the City. She noted
that the City has numerous parks located throughout the City and, with the exception of replacing
playground equipment, no consideration has been given to the needs of the residents in those areas.
She felt that a City-wide review of all parks should be conducted to determine the needs of the
community and to make the wisest investment.
Mr. Perza questioned whether it would be better to invest in the building or other aspects of Dover
Park. Responding, Mrs. Townshend stated that staff had discussed developing a plan for Dover Park
that would include the management of vegetation to improve sight lines. She noted that there are
a lot of concealed spaces in the park and managing vegetation could address some of the safety
concerns. If staff was requested to make Dover Park a priority and bring forward a plan to make
upgrades, Mrs. Townshend stated that would include a combination of interior and exterior
improvements. She reminded members that, in recent years, the City had invested in the exterior
infrastructure, such as the tennis courts, which are utilized for tennis programs, but had not invested
in the building.
Mr. Perza noted that many of the parks throughout Dover do not have buildings and questioned
whether a study had been conducted to determine whether a demand for a building at Dover Park
would exist today, if it were considered as a new park.
Ms. Blackman explained the importance of aesthetics, noting that it has a lot to do with an
individual’s decision whether to participate or not. She suggested that the use of horseshoes,
shuffleboard, and chess be considered in improving the park, explaining that individuals would not
want to be there if the facility and grounds were not maintained.
Mr. Salters stated that he served on City Council during when the development of Schutte Park was
taking place. He felt that the east side of Dover was neglected since everyone was focused on
Schutte Park. Mr. Salters suggested that the City give the east side of Dover a priority in considering
recreation for the next few years. He felt confident that the City could afford to make any necessary
improvements and repairs to the building at Dover Park and requested that City Council give this
consideration in the preparation of the City’s budget.
Mr. Roddie Byers, 606 Walker Road, advised members that it was his recollection that when the
development of Schutte Park was being considered, the original plan was to provide transportation
for children residing on the east side of Dover to Schutte Park. In addition, he stated that there were
plans to upgrade the sidewalk system to assist in getting children to Schutte Park.
Mr. Fogell advised members that there are other maintenance issues involving the City parks, such
as the ballfields having ruts that need filled.
Mr. Hutchison stated that he has observed residents using the park for outdoor recreation and noted
that the building does not meet the recreation needs for the community. He questioned if the City
should invest $110,000 into a building that doesn’t begin to meet the recreation needs of today or
Page 74
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 4
whether that money should be invested into the park (that comes with the real value). Mr. Hutchison
noted that there is only one (1) local facility for senior citizens, the Modern Maturity Center, which
serves 20,000 members from all areas of the City. He relayed support for improving and upgrading
the Park; however, he questioned if it should include the building.
Mr. Carl Barnes, 43 Homberg Circle, suggested that members not only consider the monetary value
but the intangibles as well. Although the park would continue to function without the structure, he
questioned what message demolition of the building would send. It was his feeling that the ADA
issues should have been addressed several years ago. Concurring with Mr. Fogell, Mr. Barnes stated
that he was not aware that the building was available for use and felt that there may not have been
enough advertising. Mr. Barnes also indicated that whether there is a building on the property or not,
security will still be required at the Park. He suggested the installation of outside restrooms,
especially if the building is demolished. It was his opinion that the City would need to provide
something in return for the community if the building is demolished and providing outside restrooms
may be such an option.
Concurring, Mr. Fogell advised members that the only public restrooms available in the area are
portable toilets located near the tennis courts. He suggested that the City consider additional
restrooms throughout the park.
Mr. Byers suggested that the City conduct a community survey to assist in determining what action
should be taken related to the Dover Park recreation center.
Mr. Edward Christian, 9 Pennwood Drive, Dover, felt that the City should stop doing things
piecemeal and develop short-term and long-term plans instead. He reminded members that an
extensive study was conducted when Schutte Park was constructed and suggested that members use
such studies to help determine what action should be taken. He recommended a cost and benefit
review approach, explaining that if the benefits exceed the costs, the improvements and/or repairs
should be completed; however, if the costs exceed the benefits, additional consideration should be
given to determine if such improvements and/or repairs should be done. He noted that, for years,
there had been concerns with the lack of recreation for youth and that this concern remains in the
community today.
Mrs. Townshend advised members that, in 1996, when she served as the Recreation Planner for the
State of Delaware, a State-Wide Comprehensive Outdoor Recreation Plan was conducted. When
the survey data was gathered from 1995, Dover was over-sampled so that there was better validity
because the City of Dover was in the process of conducting recreation planning at that time. In 2002,
when she left that position, the State was in the process of conducting the 2002 State-Wide
Comprehensive Outdoor Recreation Plan and that, at that time, there was no over-sampling, resulting
in the review of the needs at the County level.
Mr. Wayne Voshell, City of Dover Recreation Coordinator, advised members that, for several years,
the citizens had indicated a desire for more outside activities, such as bike trails, walking trails, etc.
He stated that, with the exception of basketball, the citizens had not indicated their desire for indoor
recreation activities. Mr. Voshell indicated that one of the main issues with the Dover Park
recreation center was the design of the building, noting difficulty hearing in the main room.
Page 75
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 5
Although most leagues and activities are outdoors, he stated that girl scout and boy scout club
meetings were held in the building; however, he asked members to imagine trying to hear with
several boys and girls talking in the room at the same time.
Mr. Voshell agreed with the concerns regarding safety, explaining that he had been at the building
late in the evening and did not feel safe. Responding, Mr. Salters stated that individuals feel safer
at Schutte Park because of the excessive lighting. He relayed the simplicity of installing additional
lighting at the Dover Park recreation center and suggested that the ceiling could be dropped at a
minimal cost (less than $20,000), which would make the room very usable.
Noting the lengthy discussion, Mr. Dixon suggested the possibility of creating a committee to review
this matter. He suggested a recess to allow members to tour the building and park. Mr. Dixon stated
that, following the tour, members should know which direction the City should take regarding this
matter.
Mr. Ellis Louden, 3 Michael Court, felt that more clear walking points were necessary. In addition,
he questioned if the committee to be created would include community members and whether those
members would be present when the City makes their determination. He questioned if there was a
real Recreation Plan for the City.
Mr. Perza moved for a 15 minute recess, seconded by Mr. Hutchison and unanimously carried.
Meeting recessed at 4:44 p.m. and reconvened at 4:56 p.m.
Mr. Perza moved to recommend assigning the Dover Park Study to the Planning Department
for the purpose of: 1) developing a Request for Proposals (RFP) to address the most
appropriate investment of city-wide park resources in Dover Park, Schutte Park, and the
parks located in the southwest and southeast corners of the City; 2) to determine whether the
investment of sufficient resources is necessary to address all outdoor use, indoor use, restroom
facilities, security facilities; 3) as a part of the RFP, to make a recommendation on what the
best and most effective expenditure of resources is before a decision is made to expend
additional resources on any of the park facilities within the City; 4) as a part of this review,
there should be a resource inventory to determine whether or not the City has any of the prior
studies and to determine if they are practical for future use; and, 5) to gather additional input
not only from the communities on the east side of Route 13, but also from communities that
have parks in the southern, western, and northern parts of the City. This is to be
accomplished before the City commits to expending any resources to demolish any park
buildings or for the purposes of creating or constructing additional park services in the City.
The motion was seconded by Mr. Hutchison and unanimously carried.
Mr. Perza moved to defer agenda items #2 and #3 to the next Committee Meeting, seconded
by Mr. Hutchison and unanimously carried.
Page 76
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 6
Mr. Perza moved to recommend that the City re-open the Dover Park recreation center for
use, noting that anyone wishing to rent the facility can do so by contacting the City of Dover
to coordinate the event as needed; the building itself will not be closed for future use until the
recommended Dover Park Study is reviewed. The motion was seconded by Mr. Hutchison and
unanimously carried.
Responding to Ms. Blackman, Mr. Dixon announced that the availability of the building will be
publicized.
Ms. Roxie Smiley-Carter, 320 Broadstair Place, questioned if members of the community will be
included in the decision process by serving on the committee. She relayed concerns regarding the
reopening of the building, explaining that there was a mold odor and that any mold and mildew
issues should be resolved to assure no one gets sick. She also felt that the building needed to be
cleaned and sanitized.
Concurring, Mrs. Horsey, stated her surprise with the motion to re-open the building, explaining her
feeling that the building was not suitable to re-open at this time. She felt that it would take a lot of
work to clean the building to make it suitable for activities. It was her hope that, with the motion,
it was implied that the building would be made suitable before anyone would be permitted to use it.
Mrs. Townshend stated that there is a major moisture issue, which is causing the mold and mildew.
She explained that unless the roof is replaced, the moisture cannot be controlled. In addition, there
are issues with drainage. When the Study was completed by the Environmental Consultant, she
stated that there were no findings that indicated that the building was unsafe. However,
Mrs. Townshend indicated that there are certain rooms within the building that will not be opened
due to mold issues caused by excessive moisture. She assured members that there would be a
thorough cleaning of the building; however, she reminded them that this issue was before them
because of the issues with the building, which need to be addressed if the building is going to be
maintained for years.
Responding to Ms. Smiley-Carter, Mrs. Townshend stated that there are roof leaks located in the
back section of the building and there are issues involving rainwater flowing towards the building
rather than away from the building, which causes more moisture. Unless the City invests a
substantial amount of money, there will continue to be a moisture problem.
Mr. Perza explained that, at this time, there was no authorization to correct the problems with the
building; therefore, there would be limitations on its use and anyone wishing to use the building
would do so with the understanding that it will be used as it is today.
Referring to the City-wide survey conducted several years ago, Mr. Byers stated that the
John W. Pitts Center at Schutte Park was not built large enough to accommodate the needs of the
community. To assist in meeting those needs, he suggested that the City allocate funding for the east
side of Dover, since it is known that recreation is needed in that area.
Page 77
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 7
Mr. Perza explained that the reality of the City’s budget is that there are limited resources. At this
time, the Planning Department staff will utilize what resources are available to benefit everyone in
the City. He stated that Schutte Park seemed to be the focal point for the City’s planning during the
past 15 years and that no other areas in Dover, including the east side of Route 13, have received any
park amenities during these past years either. Mr. Perza stated that a recommendation not to
demolish the building, but to conduct a study, did not necessarily mean that all future recreation
investment would be made in Dover Park. He explained that such investment may be divided among
parks located in other parts of Dover. As a representative of the Second District, Mr. Perza stated
that the communities in the south side of Dover have recreation needs and expressed his belief that
communities in other parts of the City also feel that their recreation needs are not being met;
therefore, he reiterated that the recommended study would be City-wide.
Responding, Mr. Byers felt that, with the exception of Schutte Park, the City’s more populated
recreation facility is located on the east side of Dover, explaining that the parks located in other parts
of the City are very small. As such, he stated that Dover Park should be the anchor park for the east
side of Dover.
Ms. Rebecca Gordon, 167 Westhill Drive, Camden, DE, stated her feeling that the City had planned
for the demolition of the Dover Park recreation center when Schutte Park was being constructed.
Mr. Koenig explained that the City has a Capital Investment Program (CIP) that is available to the
public with the Budget on the City’s website. He stated that this portion of the budget outlines the
capital investments that the City has planned for the park system, by park, for the next five (5) years.
It was his recollection that this investment equates to several million dollars. Mr. Koenig assured
members that the CIP did not mention the demolition of the building and that staff presented the idea
of demolition when it was determined that there were excessive costs involved with repairing the
building, including the replacement of the roof at a cost of $30,000. In previous years, he stated that
the City employed staff that could have done the work in-house, which would have saved on these
expenses. Prior to putting any investment into the building, staff wanted to know the condition of
the building and, as a result, Compliance Environmental, Inc., was retained to do a Building
Condition Survey. Upon receipt of their report (Findings from a Building Condition Survey), staff
was made aware that there was a need to spend $110,000 just to bring the building up to what would
be considered the existing standard. Mr. Koenig assured members that it was never staff’s intention
to demolish the building. He explained that the question is whether the City should invest $200,000
in the existing building or take the $200,000 and invest it elsewhere. He reminded members that the
City is facing a $7.5M budget short-fall over the next five (5) years. He stated that the reality is that
recreation improvements, along with vehicles, street cleaning, parking improvements, etc., often get
deferred in order to provide funding for the City’s current operations.
Mr. Koenig advised members that there was no public interest in the Dover Park recreation center
until the demolition of the building was presented for consideration. He requested that residents
make the City aware if there is an issue that is important to the community. Mr. Koenig noted that
the City has never taken action against an issue that is important to the community, explaining that
if it is important to the community, the City will find the means to support them; however, this
support may require an increase in property taxes.
Page 78
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 8
Mr. Dixon relayed appreciation for all the participation regarding this matter.
Mr. Hutchison moved for adjournment, seconded by Mr. Perza and unanimously carried.
Meeting adjourned at 5:21 p.m.
Wallace R. Dixon
Chairman
WRD/MK/jg/dd/tm
S:\AGENDAS-MINUTES-PACKETS\Committee-Minutes\2013\10-14-2013 PR&CE.wpd
Attachments
Attachment #1 - Correspondence Regarding Future Use of the Dover Park Recreation center
Attachment #2 - Presentation - Future Use of Dover Park Recreation center
Page 79
ATTACHMENT #1
PR&CE Committee Meeting of 10/14/2013
Page 83
ATTACHMENT #2
PR&CE Committee Meeting of 10/14/2013
Ann Marie Townshend, AICP
Director, Planning & Community
Development, City of Dover
PR&CE Committee Meeting of 10/14/2013
ATTACHMENT #2
Page 84
Constructed in 1974
Based on Building Condition Survey, update
of building systems estimated at
approximately $110,475.
Estimate does not include functional updates
to building, including upgrades to comply
with Americans with Disabilities Act.
Page 85
Before proceeding with investment to
upgrade/update the building a structural
evaluation is strongly recommended.
Page 86
In recent years, programming efforts
have been largely unsuccessful.
Majority of classes/programs scheduled
for Dover Park Recreation Center have
been canceled due to low registration.
Primary function of building – staff offices
and rental for baby/bridal showers and
private parties.
Page 87
FY05-FY12 Dover Park Recreation Center Class Totals
ALL CLASSES YOUTH CLASSES
Classes Classes Avg Reg Per Classes Classes Avg Reg Per
Total Regs Total Regs
Offered Held Class Offered Held Class
FY12 5 1 17 17 5 1 17 17
FY11 11 3 7 3.5 0 0 0 0
FY10 16 5 19 3.8 0 0 0 0
FY09 3 2 30 15 0 0 0 0
FY08 24 11 93 8.5 15 10 84 8.4
FY07 28 21 206 9.8 23 19 196 10.3
FY06 26 19 146 7.7 22 15 129 8.6
FY05 31 18 110 6.1 25 15 93 6.2
TOTALS 144 80 628 7.8 90 60 519 8.6
NOTE: Opening of the John W. Pitts Center in spring 2008 reflected
in FY2009 beyond.
Page 88
Concerns from the community that
demolition of recreation center building
diminishes recreation opportunities east
of US 13.
Demolition proposal does not affect
programming and other availability of
opportunities to use Dover Park.
Page 89
Playground
Pavilions
Basketball Courts
Tennis Courts
Softball Fields
Multipurpose Fields
Page 90
What are the recreation demands east of
US 13 that are not being met?
How can we best meet them?
Will renovation of the existing building
meet the needs? Or is the need
something else?
Renovating the existing building would
provide a multipurpose room NOT
playing courts or other sports related
activity area.
Page 91
Hire a consultant to do a Parks and
Recreation System Plan for the City –
including Dover Park.
Plan would address indoor and outdoor
recreation needs and guide investment in
our parks to help meet the needs system-
wide.
Plan would make recommendation on
building partnerships to meet recreation
needs.
Page 92
Maintenance of building and minimal
repairs.
Make building available for rentals and
for programming.
Utilize partners for provision of
programming.
Building would be open only for
scheduled events or programming.
Page 93
LEGISLATIVE, FINANCE AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held on October 14, 2013, at
6:30 p.m. with Chairman Lynn presiding. Members present were Mr. Slavin, Mr. Rushe, and
Mr. Shevock. Mr. Hare was absent. Members of Council present were Mr. Dixon, Mr. Hutchison,
and Council President Bonar. Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Shevock moved for approval of the agenda, seconded by Mr. Rushe and unanimously
carried.
Creation of Ad Hoc Financial and Operational Advisory Committee
Due to concerns for the City’s financial future, Mr. Hutchison advised members that he, along with
Mrs. Williams, have requested consideration of the creation of an Ad Hoc Financial and Operational
Advisory Committee to review the City in total and make recommendations for achieving
efficiencies and preparing for long-range objectives. He reminded members that it is projected that
there will be a $7.5M shortfall for the City over the next five (5) years.
Mr. Hutchison suggested that the Committee, to be appointed by the Council President and
confirmed by City Council, be comprised of himself, Councilman Lynn, Councilwoman Williams,
and three (3) civilian members. The qualifications for the three (3) civilian members are
recommended to be as follows: Two (2) members with an extensive financial background,
preferably dealing with large budgets; must hold at least a bachelor’s degree in financial management
or related field; and must have at least seven (7) years experience. One (1) member with an
extensive background in operations management or business development; must hold at least a
bachelor’s degree in business administration, operations management, or related field; and must have
at least seven (7) years experience.
Mr. Hutchison indicated an expectation that this committee would work with the City Manager and
Treasurer/Controller to develop a plan and provide their recommendations to the Legislative,
Finance, and Administration Committee on January 13, 2014, with Council consideration taking
place on January 27, 2014.
Chairman Lynn expressed his opinion that, rather than create another committee to perform the same
responsibilities as the Legislative, Finance, and Administration Committee, a series of Special
Meetings be held by the Legislative, Finance, and Administration Committee to address these
financial and operational concerns. Considering that certain issues may be outside of the scope or
expertise of the current membership of the Committee, he suggested that two (2) additional
Committee members be appointed for the purpose of serving during these Special Meetings either
in a capacity as special members, advisory members, or friends, etc.
Mr. Slavin advised members that during his previous term on Council, he had requested that the
City Manager (Mr. DePrima) consider the Delaware Economic and Financial Advisory Council
(DEFAC) revenue forecast model, used by the State of Delaware, to review the manner in which the
City forecasts revenues. He stated that the revenue report which members currently receive was a
result of this request. He felt that a dispassionate “set of eyes” is necessary to review the issues. He
preferred that an advisory council comprised fully of citizens be created to review the revenue side
Page 94
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF OCTOBER 14, 2013 PAGE 2
and make recommendations to City Council. The expenses could be reviewed by the Legislative,
Finance, and Administration Committee and City Council. He noted that there is a lot of untapped
brain power available to the City between the Universities, business men and women in the
community, and others. If the City were to establish such a committee, Mr. Slavin questioned
whether the decisions would be binding on Council, noting that DEFAC decisions were binding on
the General Assembly. He relayed his support for pursuing the idea and reiterated his suggestion that
such a committee serve as a fully citizen advisory committee.
Mr. Shevock questioned the creation of another a committee, and suggested that it be created as an
ad hoc committee with a sunset provision of three (3) or five (5) years.
Council President Bonar urged members to support establishing the committee, consisting of up to
seven (7) members, with recommendations to be presented to the Legislative, Finance, and
Administration Committee for their review and recommendation to City Council.
It was the consensus of members that this matter not be included on the consent agenda when
presented to City Council, to allow members an opportunity for discussion.
Mr. Slavin moved to recommend forwarding this matter to City Council for discussion of a
reconfigured composition of the proposed committee, with the understanding that the
members endorsed the idea in principle. The motion was seconded by Mr. Rushe and
unanimously carried.
By unanimous consent, the meeting adjourned at 6:41 p.m.
Sean M. Lynn
Chairman
SML/TM/jg/dd
S:\AGENDAS-MINUTES-PACKETS\Committee-Minutes\2013\10-14-2013 LF&A.wpd
Page 95
Prepared for: City Council CITY OF DOVER
Council Workshop: Sept. 18, 2013 FISCAL YEAR JULY 1, 2013 TO JUNE 30, 2014
REVENUE REPORT
As of September 30, 2013
25.0%
FY14 YTD % BUDGET FY13 FY12
GENERAL FUND BUDGET REVENUES RECEIVED COMMENTS REVENUES REVENUES
1 Property Taxes $ 10,852,300 $ 10,708,000 98.7% Billed in July $ 10,768,800 $ 10,765,741
2 Payment In Lieu of Taxes 317,200 31,900 10.1% 357,600 284,457
3 Transfer from Electric Fund 8,000,000 2,000,000 25.0% 8,000,000 7,876,288
4 Intrafund Service Receipts Electric 3,319,400 727,700 21.9% 3,192,900 3,105,015
5 Transfer from Transfer Tax Fund 1,315,500 298,100 22.7% 1 large receipt $54K in July 1,108,000 1,373,208
6 Business Licenses 1,460,000 1,412,200 96.7% Billed in July 1,462,500 1,470,097
7 Intrafund Service Receipts Water/Wastewater 1,134,900 256,500 22.6% 1,045,500 894,186
8 Sanitation Fees 2,676,500 651,000 24.3% 2,624,900 1,903,623
9 Permits & Other Licenses 1,167,500 362,900 31.1% Rental dwelling/trailers billed in July 1,162,800 1,346,769
10 Transfer from Municipal Street Aid Fund 527,400 - 0.0% 531,100 527,042
11 Fines & Police Revenue 666,000 107,200 16.1% 612,200 681,952
12 Police Extra Duty Fees 650,000 73,600 11.3% 702,100 600,310
13 Transfer from Police Grant Funds 110,000 6,400 5.8% 170,400 600,310
14 Court of Chancery Fees 863,200 165,100 19.1% One month in arrears 917,700 863,220
15 Transfer from Water/Wastewater Fund 500,000 125,000 25.0% 500,000 424,508
16 Transfer from Civil Traffic Penalties Fund 600,000 - 0.0% 299,800 518,638
17 Library Revenues & County Reciprocal Pymt 466,600 18,100 3.9% 471,100 475,822
18 Franchise Fees 606,200 - 0.0% Quarterly receipts in arrears 618,300 568,240
19 General Fund Grant Receipts 623,500 70,000 11.2% Police Pension grant 721,600 1,010,452
20 Recreation Revenue 133,000 28,500 21.4% 144,500 112,480
21 Other Miscellaneous Receipts 213,800 31,000 14.5% 193,400 232,535
22 Interest Income 75,000 7,700 10.3% 91,800 53,175
TOTALS $ 36,278,000 $ 17,080,900 47.1% $ 35,697,000 $ 35,688,068
Final Budget $ 35,569,000 $ 35,016,778
Page 96
Prepared for: City Council CITY OF DOVER
Council Workshop: Sept. 18, 2013 FISCAL YEAR JULY 1, 2013 TO JUNE 30, 2014
REVENUE REPORT
As of September 30, 2013
25.0%
FY14 YTD % BUDGET FY13 FY12
WATER/WASTEWATER FUND BUDGET REVENUES RECEIVED COMMENTS REVENUES REVENUES
1 Water Fees $ 4,730,700 $ 1,249,200 26.4% $ 4,551,800 $ 4,707,918
2 Wastewater Fees 3,642,700 969,200 26.6% 3,564,600 3,722,985
3 Wastewater Adjustment Fees - County Trtmt 2,980,300 800,900 26.9% 2,926,600 3,050,127
4 Groundwater Inflow Adjustment 1,324,600 359,500 27.1% 1,314,000 1,290,968
5 Water Impact Fees 357,000 31,800 8.9% 221,500 308,700
6 Wastewater Impact Fees 323,000 28,500 8.8% 386,000 277,400
7 Water Tank Space Leasing 333,800 26,200 7.8% 300,100 313,101
8 Interest Income 23,100 1,100 4.8% 17,800 31,889
9 Other Miscellaneous Revenues 82,000 16,800 20.5% 72,400 104,634
10 Grant Receipts - - 0.0% 50,900 -
TOTALS $ 13,797,200 $ 3,483,200 25.2% $ 13,405,700 $ 13,807,722
Final Budget $ 13,822,200 $ 13,819,800
25.0%
FY14 YTD % BUDGET FY13 FY12
ELECTRIC REVENUE FUND BUDGET REVENUES RECEIVED COMMENTS REVENUES REVENUES
1 Sales to Customers $ 76,286,700 $ 22,423,100 29.4% $ 86,886,900 $ 99,859,602
2 Purchased Power Adjustment - - 0.0% - (2,290,989)
3 Utility Tax 1,492,200 360,100 24.1% 1,443,900 1,944,543
4 Transfer from Rate Stabilization Reserve 4,000,000 1,000,000 25.0% 5,400,000 -
5 Miscellaneous Revenue 988,800 212,600 21.5% 1,918,000 1,381,300
6 Interest Income 119,400 3,600 3.0% 154,100 12,662
7 Intrafund Service Fees - Water/Wastewater 98,500 22,700 23.0% 136,000 171,646
TOTALS $ 82,985,600 $ 24,022,100 28.9% $ 95,938,900 $ 101,078,764
Final Budget $ 95,971,700 $ 99,934,036
Page 98
ACTION FORM
PROCEEDING: Council AGENDA ITEM NO.:
DEPARTMENT OF ORIGIN: Electric DATE SUBMITTED: 10/17/13
PREPARED BY: Steve Enss, Interim Electric Director
SUBJECT: Vehicle purchase, Replacing Bucket truck 766
RELATED PROJECT: N/A
APPROVALS: City Manager, Controller/Treasurer
EXHIBITS: Vendor Quote & National Joint Powers Alliance (NJPA) Vendor contract.
EXPENDITURE REQUIRED: $241,828.00 AMOUNT BUDGETED: $225,000
FUNDING SOURCE (Dept./Page in CIP & Budget): Electric –Transmission & Distribution, Account Number
487-8200-562-40-23, Page 172 of the draft budget PDF. ( 2001 Freightliner )
TIME TIME TABLE: Order will be placed following Council approval.
RECOMMENDED ACTION: Staff recommends purchasing the 2014 bucket truck from Dueco (vendor of
Terex) for the total cost of $241,828.00.
BACKGROUND AND ANALYSIS
The purpose of the bucket truck purchase is to replace an ageing 2001 Freightliner
bucket truck that is need of many repairs. Bucket trucks are normally replaced in 10 –
15 years depending on the condition of the vehicle.
The Electric department budgeted for the basic model at $225,000. The plan was to use
the trade-in value of the 2001 bucket truck to equip the new truck with recommended
safety lights, decals, winches, inverter and etc.. The City has a procedure for selling
used vehicles that recommends the sale of the used vehicle and discourages trade-ins.
Assets have to be recorded at cost for depreciation purposes and any trade-in value will
be recorded as a gain/loss on the sale of the vehicle. The City has also experienced a
better return by selling used vehicles on the internet auction sites. This procedure also
prevents budget variances in the estimated trade-in value.
The Controller/Treasurer will monitor the budget for savings or unplanned revenue to
cover the shortfall. If this can’t be accomplished, the difference of $16,828 will be
covered through the beginning budget balance through a budget ordinance.
The department evaluated two bucket truck manufactures and both companies (Altec
and Terex) are part of the NJPA and recognized by the State of Delaware and the City
of Dover‘s purchasing policy. The Terex bucket truck was found more practical and
useful for overhead line work. The last few trucks were purchased through Altec and the
department felt that opening an opportunity for a second vendor would be in the best
interest of the City.