UTILITY COMMITTEE
The Utility Committee Meeting was held on August 12, 2013 at 6:00 p.m. with Chairwoman Williams
presiding. Members present were Mr. Perza, Mr. Slavin, Mr. Blakeman, and Mr. Snaman. Members of
Council present were Mr. Dixon (arrived at 6:05 p.m.), and Mr. Hutchison. Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Snaman moved for approval of the agenda as presented, seconded by Mr. Blakeman and
unanimously carried.
Request for Abandonment of Right-of-Way (Unimproved) - Overlook Place
Mr. Scott Koenig, City Manager, advised members that a letter was received from Mr. Michael P. Bouchard,
126 Overlook Place, dated November 13, 2012, requesting the abandonment of an unimproved portion of
the Overlook Place right-of-way within the Overlook on Silver Lake Subdivision. He stated that the area
extends approximately 30' from the eastern edge of public improvements within the right-of-way and that
Mr. Bouchard requested that this area be disposed of in its entirety to his parcel at 126 Overlook Place.
Mr. Bouchard indicated that this area is poorly maintained and that it would be a benefit to the community
if this area was disposed of to the property owners for proper maintenance. As a result, a letter was sent to
the other adjacent property owner, Ms. Chu Pao Robinson of 125 Overlook Place, to determine her interest
in participating in the abandonment and having a portion of the right-of-way conveyed to her.
Mr. Koenig stated that both adjacent property owners were interested in participating in the abandonment.
Public Works’ staff confirmed that this area was unimproved; however, if abandoned, public utility
easements would be required for the existing water and wastewater infrastructure located therein. He noted
that the right-of-way for Overlook Place is 51’ wide and, in accordance with City policy, half of the
right-of-way, or 25.5’, would be conveyed to the requesting parties. Mr. Koenig assured members that staff
had no objections to the abandonment of the subject right-of-way and recommended conveyance of 25.5’
of said right-of-way to 125 and 126 Overlook Place with the stipulation that a public utility easement be
retained for each parcel. Members were provided a map depicting the right-of-way proposed for
abandonment (noted in red).
Staff recommended the following action: 1) abandonment of the subject right-of-way with conveyance of
25.5’ of said right-of-way to 125 and 126 Overlook Place, currently owned by Chu Pao Robinson and
Michael P. Bouchard, respectively, in conjunction with the provision of a public utility easement for each
parcel; and 2) adoption of a resolution by Council setting a public hearing regarding the proposed
abandonment for September 9, 2013.
Mr. Blakeman moved to recommend approval of staff’s recommendation and adoption of a resolution
by Council setting a public hearing regarding the proposed abandonment for September 9, 2013,
as recommended by staff. The motion was seconded by Mr. Perza and unanimously carried.
[City Clerk’s Office Note: In accordance with the City’s Procedure for Alley Abandonments, Resolution
No. 2013-21 setting a Public Hearing (Attachment #1) will be presented to Council for consideration.]
Page 2
UTILITY COMMITTEE MEETING OF AUGUST 12, 2013 PAGE 2
TEA/NAES Report (May)
The TEA/NAES Monthly Report for May 2013 was provided to members to enable them to monitor electric
sales and revenues received, which will provide a better understanding of any fluctuations that occur and
allow the opportunity to make improvements if deemed necessary.
Mr. Scott Koenig, City Manager, noted that last year overall power supply costs were $668,296 under budget
due to the lower than budgeted cost of energy purchases. He stated that moving into Fiscal Year 2014, the
margins and differential were tightening as a result of power supply budgets, hedge purchases, etc.;
therefore, the expectation was that there would be a much smaller spread between the budgeted versus actual
amounts.
In response to Mrs. Williams regarding the projected hedge variance, Mr. Koenig stated that the numbers
being used for financial forecasting were the budgeted amounts for power purchased. He explained that the
actual numbers were currently tracking just slightly lower than these figures. Mrs. Donna Mitchell,
Controller/Treasurer, indicated that the unhedged amount is included in the PJM charges and, as more
hedges are filled in, that number would decrease and the hedge number would increase. She stated that until
the hedges are all filled in, the City would not know the final amounts and stated her hope that the hedge
ratios would change in the City’s favor over time.
Responding to Mr. Blakeman, Mr. Koenig stated that the hedge ratios were locked in at the figures listed
in the report through 2015-16 and the portfolio target was to have approximately 80% hedged for the current
year. In the past, this percentage had been in the high 80s and possibly up to 90% but had been decreased
to take advantage of favorable purchases in the spot market since the City’s transition to TEA. He indicated
that this matter was being analyzed on a monthly basis.
Mr. Slavin moved to recommend acceptance of the TEA/NAES Monthly Report for May 2013,
seconded by Mr. Blakeman and unanimously carried.
UPDATES
Members were provided the following updates:
Green Energy Funding and Programming
Mr. Scott Koenig, City Manager, reviewed a summary of Green Energy Funding and Programming. He
reminded members that this is a continuous, revolving fund since there is a green energy component to each
City utility bill; therefore, money is collected and put into this fund for these types of projects. He advised
members that the funding reimbursement was lagging behind implementation of some of the projects since
the “flow” into the fund is slower than the “flow” out of the fund at times.
No further action was taken by the Committee.
Update - National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm Sewer
Systems (MS4) Permit
Mr. Scott Koenig, City Manager, stated that staff would be meeting with representatives of the Delaware
Department of Natural Resources and Environmental Control (DNREC) within the next few weeks to
discuss the procedure for renewing the City’s permit relative to the National Pollution Discharge Elimination
System (NPDES) Municipal Separate Storm Sewer Systems (MS4). He advised members that the current
permit expired and DNREC had not issued new permits.
Page 3
UTILITY COMMITTEE MEETING OF AUGUST 12, 2013 PAGE 3
Mr. Koenig stated that future staffing issues for the permit were being reviewed, which would probably
include efforts from the Public Works and Planning Departments. He noted that this permit would serve
as the foundation document for how the City designs the Street Department and addresses storm sewer
cleaning, street construction, and reconstruction, etc., since the permit requires constant review and
maintenance relative to the quality of stormwater that falls on road infrastructure and the way it falls through
the City’s storm sewer infrastructure. He stated that, as a result, staff would need to determine ways to
embed the requirements of this permit into the City’s daily operations.
Mr. Koenig advised members that a large component of how the City complies at this time involves street
sweeping, maintenance of roads to avoid potholes and deterioration, etc. Although Dover does not have
large geographic differences in heights that would cause damage from stormwater, some projects, such as
the replacement of the Tar Ditch stormwater interceptor, etc., would be worked into the permit in order to
comply - not only for maintenance but improvement of the systems. In some instances, it would include
pond maintenance and retrofits, how park systems are run, and private property maintenance involving
construction controls, etc. Mr. Koenig explained that this is a comprehensive permit that has the ability to
dictate how the City conducts business as it relates to construction matters of this nature.
Calpine Energy Center and Garrison Oak Technical Park Project
Mr. Scott Koenig, City Manager, advised members that the City had been participating in weekly meetings
and telephone conference calls with the Calpine Energy Center. Most of the review related to the Site Plan
approval had been completed. Since this was a component of the Garrison Oak Technical Park, he stated
that a meeting was held last week with the Delaware Department of Transportation (DelDOT) to discuss
delivery schedules of the large turbine items and other items associated with the Energy Center. He advised
members that beginning in late fall, there would be a constant stream of equipment deliveries, some by barge
into the Leipsic area as well as by oversized trailer hauling, into the Garrison Tract to begin assembly of the
fixed components of the combustion turbine.
Mr. Koenig noted that the City was attempting to finalize the design aspects of the Garrison Oak Technical
Park so that the bid package for the street, water main, gravity sewer main, and storm sewer system could
be let out to bid. He stated that a meeting was held last week with DelDOT to finalize the tie-ins for the
water system on White Oak Road that would occur in the DelDOT right-of-way. While this design was
being completed, Penonni Associates was finalizing the design of the sanitary sewer pump station, to be
located in the center of the Garrison Tract land, and the force main, to be located south of White Oak Road
over to White Oak Station #5.
Mr. Koeng noted that during the City Council Meeting scheduled for later in the evening, Council would
consider the final package of sale for Lot #12 at the Garrison Oak Technical Park. If this project were to
come to fruition, construction would begin on the west side of Garrison Oak. He stated that discussions had
been held with another potential tenant at the Park and that activity at the Park had generated additional
interest from buyers and companies wishing to locate their facilities there.
In response to Mrs. Williams, Mr. Koenig stated that when the City begins construction on the road, these
efforts will be concentrated on the east side, which is the shortest distance back to the Calpine project. Once
the storm sewer, gravity sewer, water main, and road bed are completed on the east side, construction traffic
would be switched over to the east side so that construction could begin on the west side without interfering
Page 4
UTILITY COMMITTEE MEETING OF AUGUST 12, 2013 PAGE 4
with daily construction traffic. Coordinated efforts would be required between the City, the City’s
contractor, DelDOT, Calpine, and all delivery contractors to ensure that they do not interfere with each other.
It was hoped that there would be evening and weekend work while all the components were being pieced
together.
As a result of the delivery route, Mr. Koenig stated that roadway improvements may be made to Route 9
and/or along roadways outside of City limits in order to accommodate the anticipated oversized and
supersized loads delivering to Calpine; however, this had not been finalized.
Responding to Mr. Blakeman, Mr. Koenig stated that 85%-90% of the rights-of-way had been acquired to
accommodate the transmission line from the energy block at the Garrison Tract to the Cartanza Substation.
In response to Mr. Hutchison, Mr. Koenig indicated that Calpine had acquired almost all permits necessary
to complete the project; however, a final Site Plan approval letter from the City would be required, which
was almost complete. Although filing with the Federal Energy Regulatory Commission (FERC) would be
required, this would be the responsibility of Eastern Shore Natural Gas. He stated that the only remaining
issues were the right-of-way alignments for the line going to the 230kV and an Administrative Site Plan
from the City to Kent County to amend the 230kV tie to accommodate the expansion of the fence and the
new equipment for Delmarva Power. As a result, he felt confident that there were no impediments to
obtaining all approvals necessary to finalize the Energy Center. Mr. Koenig anticipated that all pending
issues would be finalized prior to the end of the year.
Mr. Snaman moved for adjournment, seconded by Mr. Blakeman and unanimously carried.
Meeting adjourned at 6:28 p.m.
Beverly C. Williams
Chairwoman
BCW/TM/jg/js/mk/dd
S:\AGENDAS-MINUTES-PACKETS\Committee-Minutes\2013\08-12-2013 UTILITY.wpd
Attachment
Attachment #1 - Proposed Resolution No. 2013-21 - Setting a Public Hearing for Abandonment of Unimproved Right-of-Way -
125 and 126 Overlook Place
Page 5
ATTACHMENT #1
Utility Committee Meeting of 08/12/2013
City of Dover
MAYOR AND COUNCIL
1 DRAFT PROPOSED COUNCIL RESOLUTION NO. 2013-21
2 A RESOLUTION PROPOSING THE VACATING AND ABANDONMENT OF A CERTAIN
3 RIGHT-OF-WAY SITUATED IN THE CITY OF DOVER.
4 BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL
5 MET:
6 Section 1. The Council of the City of Dover favors the vacating and abandonment of the following
7 right-of-way:
8 Adjacent to 125 Overlook Place (ED-05-068.09-01-16.00)
9 Beginning at a point identified as the southeast corner of parcel #ED-05-068.09-01-16.00; thence running
10 South 00 degrees 47 minutes 50 seconds West 25.50 feet along the easterly line of a 51' wide public
11 right-of-way to a point in the same; thence running North 89 degrees 12 minutes 10 seconds West 30.00 feet
12 to a point in the same; thence running North 00 degrees 47 minutes 50 seconds East 25.50 feet to a point in
13 the southerly property line of parcel #ED-05-068.09-01-16.00; thence running South 89 degrees 12 minutes
14 10 seconds East 30.00 feet to the point and place of beginning and containing 0.0176 acres (765.00 square
15 feet) of land be the same more or less. The above described parcel of land shall be considered a public
16 utility easement, reserving the rights of the City of Dover, their agents or assigns to free access for ingress
17 and egress to these premises and every part thereof at all times for purpose of installing, maintaining and
18 operating its existing public utilities.
19 Adjacent to 126 Overlook Place (ED-05-068.09-01-48.00)
20 Beginning at a point identified as the northeast corner of parcel #ED-05-068.09-01-48.00; thence running
21 North 00 degrees 47 minutes 50 seconds East 25.50 feet along the easterly line of a 51' wide public
22 right-of-way to a point in the same; thence running North 89 degrees 12 minutes 10 seconds West 30.00 feet
23 to a point in the same; thence running South 00 degrees 47 minutes 50 seconds East 25.50 feet to a point in
24 the northerly property line of parcel #ED-05-068.09-01-48.00; thence running South 89 degrees 12 minutes
25 10 seconds East 30.00 feet to the point and place of beginning and containing 0.0176 acres (765.00 square
26 feet) of land be the same more or less. The above described parcel of land shall be considered a public
27 utility easement, reserving the rights of the City of Dover, their agents or assigns to free access for ingress
28 and egress to these premises and every part thereof at all times for purpose of installing, maintaining and
29 operating its existing public utilities.
30 Section 2. The Council of the City of Dover will sit on Monday, September 9, 2013, at 7:30 p.m., in the
31 Council Chambers at City Hall, Dover, Delaware, to hear the objections of such residents of the City or
32 owners of the property affected as shall attend, in accordance with the provisions of Section 27 of the
33 Charter of the City of Dover (Chapter 158, Volume 36, Laws of Delaware).
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 6
DRAFT PROPOSED COUNCIL RESOLUTION NO. 2013-21 PAGE 2
34 Section 3. The Clerk of Council is hereby directed to post copies of this Resolution in five (5) or more
35 public places in the City of Dover.
36 ADOPTED: *
37 S:\ABANDONMENTS\2013\126 Overlook Place\Resolution Setting the Public Hearing.wpd
38
39 CARLETON E. CAREY, SR. DAVID L. BONAR
40 MAYOR COUNCIL PRESIDENT
41 Actions History:
42 August 26, 2013 - Introduced at City Council
Page 7
Overlook Place
Proposed Right-of-Way Abandonment
Ò
! §
§Ò
!
Rd
r e
po
Le
N
nt
.
!
0 po
0 5.0
8.0 -1 Du
!
.
-7 2 1
§Ò 65 9-0
.
!
3 1
! 64 9-0 .0
×
0 8 §Ò Hw
80
. .0 06 !
06 - 79 05
- y
- 9 01
05 ED
§Ò ED 63 09-
! 8.
80 .0
06
0
-
05
06 6
8. 35 00
ED 1.
09
0 !§Ò -0
- 8
×
1-
1.0 1 01
4 1 -7 63 09-
05
64 9-0 .
-
68
82
0
ED
.
.00
.0
68 -0
0
-0 70
e
5 - nu 05 06 6
6.0
4 ×
0 0 1 Ve
64 9-0 ED
8. 27
ED 0 09
2 1 -1
8.0 9.0 63 9-0 §Ò
-0
06 6 01-6 Dr 1-
.0
!
- 3 68
05 6 9- §Ò
-0
05
ED 8.0
! -
05
6
ED
-
- 0 05 ED
05 ED
ED
0
6.0
5 1 -1
5- 12 9-0
ED0
5- 8.0
5- ED0 . §Ò 06
ED0
ED0
5- ! ×
117 1-49.00
!
115 1-50.00
113 1-51.00 09-0
§Ò
111 1-52.00
×
068.
!
09-0 09-0
09-0 068.
.
!
068. 068.
§Ò
614
! .
!
Pl 5-
erlook ED0
Ov ! §Ò
5-
ED0
126 1-48.00
.
!
5-
ED05-068.09-01-17.00
ED0
124 1-47.00 09-0
5-
5- ED0
068.
§Ò 5- ED0
122 1-46.00
! ED0
09-0
068.
ED05-068.09-
120 1-45.00
118 1-44.00 09-0
ED05-068.09-
116 1-43.00
09-0 068.
09-0
09-0 068. 068.
068.
114
112
01-42.00
01-41.00
.00
1-84
.09-0
D 05 -068
E
0 62.5 125 250 Feet
¯
Legend
Date Printed: June 31, 2013
File: m:\gis_data\projects/tech_mxds §Ò
! Overhead Electric Pole
× Hydrants
. Manholes
!
\st_abandonment_map Underground Electric Lines
Sewer Line
Department: Public Services GIS Overhead Electric Lines
Dover Parcels
City of Dover, Delaware Water Main Overlook Place
Hydrant Line