This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
1 page has little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
CITY OF DOVER HISTORIC DISTRICT COMMISSION
AGENDA
THURSDAY, July 18, 2013 - 3:00 P.M.
City Hall - Conference Room
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES OF MEETING on March 21, 2013
APPROVAL OF MINUTES OF MEETING on June 20, 2013 (Lack of Quorum)
COMMUNICATIONS & REPORTS
1. Summary of 2013 Activity
a. Summary of Applications 2013 and 2012
b. Summary of Architectural Review Certifications for 2013
2. Update on Discussion - Role and Scope of the Historic District Commission and Historic
District
OLD BUSINESS
1. Certified Local Government (CLG) Program
NEW APPLICATIONS
1. HIJ-13-05 North Street Pocket Park at 301 South Governors Avenue — Public Hearing and
Review for Recommendation on Architectural Review Certification to allow for the
construction of a park consisting of paving and landscape areas to be located at 301 South
Governors Avenue. The property is zoned C-2 (Central Commercial Zone) and is subject
to H (Historic District Zone). The property is located on the southeast corner of West
North Street and South Governors Avenue. The owner of record is City of Dover.
Address: 301 South Governors Avenue. Tax Parcel: ED-05-077.09-04-36.00-000.
Council District 4. This is associated with Site Plan Application S-13-10.
NEW BUSINESS
1. Report on Historic Preservation Commission Training Session on Design Review held
April 27, 2013 at Lewes City Hall
2. 2013-2017 Delaware’s Historic Preservation Plan: Preserving Our Past for a Better Future:
http://history.delaware. gov/preservation/planning.shtml
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSION.
Page 2
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
MARCH 21, 2013
The Regular Meeting of the City of Dover Historic District Commission was held on Thursday,
March 21, 2013 at 3:00 PM with Chairman Scrafford presiding. Members present were
Chairman Scrafford, Mr. McDaniel, Mr. Fisher, and Mr. Jackson. Mr. Salkin was absent.
Staff members present were Mrs. Melson-Williams, Ms. Cornwell, Mrs. Townshend, and Mrs.
Purnell.
APPROVAL OF AGENDA
Mr. Jackson moved for approval of the agenda as submitted, seconded by Mr. McDaniel and the
motion was unanimously carried 4-0. Mr. Salkin was absent.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF FEBRUARY 21, 2013
Mr. Fisher moved to adopt the minutes of the regular Historic District Commission meeting of
February 21, 2013, seconded by Mr. McDaniel and the motion was unanimously carried 4-0. Mr.
Salkin was absent.
COMMUNICATIONS & REPORTS
Training Opportunities
Mrs. Melson-Williams stated that included in the packet was information regarding the upcoming
Historic Preservation Commission Training Session on Design Review to be held on Saturday,
April 27, 2013 in Lewes, Delaware. The workshop will be led by Sharon Kennedy, Chairman of
the Annapolis Historic Preservation Commission. The workshop is free and formal invitations will
be issued, please inform Staff if you would like to attend.
Update on Discussion-Role and Scope of the Historic District Commission and Historic District
Mrs. Melson-Williams stated that there was a community outreach meeting that was held in a
workshop session by the Planning Office at the Dover Public Library on February 26, 2013. There
were two (2) presentations and facilitated discussions led by an outside consultant. There were
thirty (30) members from the public that attended. Mrs. Townshend reported to the City Council
Legislative Finance and Administrative Committee the ideas regarding how the process could be
streamlined and how the City could improve the preservation if it’s historic character. There are
no specific recommendations to implement at the present time. Planning Staff will continue to
conduct additional public outreach on the topic that will include a survey and more refinement of
the ideas that were put forth.
Mrs. Townshend stated that she hopes within the next two wecks to have a survey on-line and to
send it to all who participated. She hopes the information would be forwarded and looks forward
to receiving feedback. There were no comments on eliminating the Historic District Commission.
Page 3
CITY OF DOVER HISTORIC DISTRICT COMMISSION MARCH 21, 2013
There was an inquiry to expand the District on State Street.
NEW BUSINESS
HI-13-03 Capital City Trail Project: Phase 2 — Presentation on Phase 2 segment of the
Bicycle/Pedestrian Improvements Project for the Capital City Trail. A presentation of the design
concepts for bicycle and pedestrian path improvements between Martin Luther King Jr. Boulevard
(previously known as Court Street) and East Loockerman Street in the area east of the Delaware
Public Archives. The segment is located within the Historic District zone. A Presentation on Phase
1: Court Street Gateway was given in July 2012 (HI-12-04).
Mrs. Melson-Williams stated that in July 2012 a presentation on Phase I of the Capital City Trail
Project was given which focused on the segment of Court Street that is now called Martin Luther
King Jr. Boulevard extending east from Legislative Hall to Route 13 and progressing south along
Route 13. Phase 2 of the project is from the Legislative Hall area going over to Loockerman Street.
The project is a Bicycle/Pedestrian path improvement.
Representative: Jon Hermes of Century Engineering
Presentation:
Mr. Hermes stated that the Phase 1 work will begin at the end of April 2013. The Historic District
Commission approved that a brick pattern be used for the sidewalk from Legislative Hall to Family
Court. The same style will continue on Phase 2 that will start from Martin Luther King Jr.
Boulevard to the Delaware Public Archives and tying into Loockerman Street. Phase 3 will
ultimately connect to Silver Lake Park. In the handout was a map of the alignment and path area
and the color of brick to be used. The brick path will go around the existing stormwater pond. A
wall will separate the Delaware Public Archives parking lot and pathway. There will be a straight
alignment and no additional lights will be added. Landscaping, larger trees, and small plantings
will be added at the end of the project. Four benches will also be added. Today they wanted to
discuss the type of wall between the parking lot and pathway as shown on the plan. The three
alternatives presented were: brick walk with brick wall, brick walk with concrete curb-like wall,
and brick walk with red colored split-face concrete block wall. He stated that all three will work
well, but the cost difference varies yet all fit in the budget.
Responding to Mr. McDaniel’s question regarding when the work would start on Phase 2, Mr.
Hermes replied 2014. He stated that it would be a ten foot wide path. The plan would begin as soon
as Phase | was completed. The construction will take at least 120 days.
The Historic District Commission was in agreement with the first alternative: a brick walk with
brick wall. Mr. Salkin was absent.
Page 4
CITY OF DOVER HISTORIC DISTRICT COMMISSION MARCH 21, 2013
HI-13-04 Building Permit #13-260 for John Bell House at The Green — Referral by the City
Planner to the Historic District Commission for Review of Architectural Review Certification for
Building Permit application #13-260 for construction of an accessory structure (historic replica
outhouse). The project site is zoned RGO (General Residence and Office Zone) and subject to the H
(Historic District Zone). The property is located east of South State Street on the southeast side of
The Green. The owner of record is the State of Delaware. The property address is 43 The Green.
Tax Parcel: ED-05-077.09-05-28.00-000. Also associated with Building Permit #13-261 for a fence.
Mrs. Melson-Williams stated that because of the location in the Historic District a permit was filed
that was referred to the Historic District Commission. The permit filed was for construction of a
historic replica outhouse as an accessory structure in the rear yard of the John Bell House. The
associated permit is for the construction of a wood picket fence to surround the back yard area.
Staff reviewed the submission in regards to the Design Standards and Guidelines for the City of
Dover Historic Zone. Staff found that the building construction does meet the recommended
practices found in the Design Standards and Guidelines. Staff had concerns about the building
location. The Zoning Ordinance requires that accessory structures be a minimum setback of five
feet from side and rear property lines. The location of the outhouse building will be less than five
feet from the rear property lines of the John Bell House. The Historic District Commission is
authorized to waive certain bulk standards including setbacks when issuing an Architectural
Review Certificate.
Chairman Scrafford asked if there were any questions.
Representative: Ms. Elaine Brenchley of First State Heritage Park
Responding to Mr. McDaniel’s question if there was going to be a fence around the outhouse and it
would not be available to the general public, Ms. Brenchley replied correct. It will be for use by
Staff and people who are taking tours. In the evening, there are no bathroom facilities for people
who are on The Green taking tours. The fence will be locked and access will be through the house
and the outhouse will also be kept locked.
Responding to Mr. McDaniel’s question if the building was heated, Ms. Brenchley replied yes.
Responding to Mr. McDaniel’s question as to when the four (4) boxwood between the John Bell
House and the Sykes House that were removed were going to be replaced, Ms. Brenchley stated
that she was unaware; he would need to ask someone at the Courthouse. Also responding, Mrs.
Melson-Williams stated that Staff visited the site and there was boxwood that had been placed at
the rear of the Sykes House. They are not near the fence or between the buildings. The boxwood
helps screen some of the HVAC units in that area.
Responding to Mr. McDaniel’s question if the boxwood were planted in the correct location, Mrs.
Melson-Williams replied they were implemented as shown on the plan.
Page 5
F DOVER HISTORI
Responding to Mr. Fisher’s question if there was access through the gate in the fence to the
outhouse as well as through the building, Mr. Scrafford replied yes.
Mr. McDaniel moved to approve application HI-13-04 at 43 The Green for the location and
construction of an accessory structure (historic replica outhouse) and fence as shown on the
plans, seconded by Mr. Jackson and carried with four (4) yes. Mr. Salkin was absent.
HI-13-02 Family Dollar at 300 West Loockerman Street — Public Hearing and Review for
Recommendation on the Architectural Review Certification for demolition of the existing
commercial building and for construction of a new 8,308 S.F. retail building and associated site
improvements. The property is zoned C-2 (Central Commercial Zone) and is subject to the H
(Historic District Overlay Zone). The property is located on the southwest corner of West
Loockerman Street and South New Street. The owner of record is Fisher/Grimes Partnership and
equitable owner is Chesapeake Group, LLC. Address: 300 West Loockerman Street. Tax Parcel:
ED-05-077.09-01-69.00-000. Council District 4.
Mrs. Melson —Williams gave an overview of the Architectural Review Staff Report dated March
21, 2013 that was included in the packet. The application is a proposal for a Family Dollar to be
located at 300 West Loockerman Street. The property is listed on the National Register of Historic
places as part of the Victorian Dover Historic District. Staff did preliminary work related to the
history of the site. As early as the late 1800’s, the property is being utilized as the Dover Machine
Works and Auto Junk Yard with auto storage and repair. Sometime between 1929 and 1951 the
property was redeveloped with the construction of a new building for auto sales and services.
Planning Staff included information from the Dover Transit Center Neighborhood Plan and
Design Book (January 14, 2011). She stated that included in the Staff Report were comments and
recommendations as well as a series of advisory comments.
Representative: Conny Malmberg, Attorney at Young & Malmberg on behalf of the applicant
and Mr. Doug Liberman of Larson Engineering Group, Inc.
Mr. Malmberg stated that this project started with a different design and there were a number of
concerns raised by Staff in regards to the architecture, materials, site safety from a traffic flow
prospective and visibility of parking from Loockerman Street. He stated that they have worked
through all of the issues except for the parking. After addressing this in the presentation, he thinks
that they will have satisfied most of the concerns. There is not a significant alternative to the
building footprint. There is a pattern book that concentrates mainly on the difference of the street
parking on the east and west side.
Mr. Liberman gave a presentation and provided copies of a handout book of information to
members of the Commission. Referring to the presentation he stated that the building is split into
different elevations in the roofline as well as materials. The facades were alternated to look like a
couple of different buildings instead of a long blank face that you typically see at other stores.
The site going across Loockerman Street is only 100 feet wide. In order to construct the building
Page 6
CITY OF DOVER HISTORIC DISTRICT COMMISSION MARCH 21, 2013
and the parking as requested by Family Dollar, it would include the current layout presented. It
would exit off of New Street and have parking alongside the building with a drive aisle. There will
also be parking spaces along the alley with parking bumpers. Grass curbs islands have been
added to the site. The landscaping added does meet the City of Dover Code for tree requirements.
Majority of the layout was dictated by Family Dollar. They want a lot of parking oriented to the
front door and the truck loading area to be able to pull into the site and back to the door. They did
not want to back from an alley into a loading area. Family Dollar safety concern was they did not
want trucks backing in from the street or alley as they have done in the past because of a fatality
where a pedestrian was hit. He stated that he reviewed photo documentation from the 1960’s of the
original building when it was occupied by the Volkswagen dealership. He then discussed the
layout of the building renovations, window style changes, mansard style roof, doors and parking as
it was used by the NAPA Store. Referring to the aerial key map he discussed locations of the site
and parking lots throughout the area that included My Place Restaurant, Delaware Health Care,
Army/Navy Store, Capital Cleaners, Keen Gas Station, Church and Cemetery area, and Daycare.
He also compared how the proposed building looked and related to other buildings in the area.
Referring to the presentation, he stated that the height of the building is 20 feet and 4 inches, and
the total height at the corner towards Loockerman Street is 26 feet and 8 inches.
Responding to Mr. Scrafford’s question regarding the standing seam metal roof and the building
shield of the wall on the west side; Mr. Liberman replied yes the wall would be butted up.
Mr. Liberman stated that the proposed site works for the Family Dollar as it is laid out. If a
different site plan was proposed, they would probably lose the Family Dollar project.
Responding to Mr. Scrafford question regarding if the layout was approved would there be any
screening options for New Street, Mr. Liberman replied no, not for parking. Mr. Scrafford
referred to the street on the east side where there are a row of planted trees in the brick work on the
outside of the sidewalk, Mr. Malmberg replied that they could do the cut outs on the sidewalk as
they have been done on Loockerman Street. Also responding, Mrs. Townshend stated that it would
need to be approved by Public Works.
Mr. Malmberg stated that where the building is located part of the Downtown could use some
Economic Development.
Mr. Scrafford stated that his thoughts were boxwood hedge on the west side of the sidewalk, but it
would interfere with traffic and require maintenance. He suggested it being screened with trees.
Responding to Mr. Scrafford’s question on if there was a proposal to screen the parking, Mr.
Malmberg stated that this could be done, referring to a photo he stated it looks more suburban than
urban having a grassy area to block parking. Their thought to screen the parking was a short brick
Page 7
CITY OF DOVER HISTORIC DISTRICT COMMISSION MARCH 21, 2013
wall along Loockerman Street that would urbanize the area a little. Mr. Scrafford asked if they
were referring to New Street; Mr. Malmberg replied that New Street is too tight to do anything.
Also responding, Mrs. Townshend stated that her concern regarding Loockerman Street is
pedestrian conflict of people turning around and backing out of parking spaces coming over the
sidewalk.
Mr. Scrafford stated that there was already a place that replicates this concern.
Mrs. Townshend stated that many of the items are nonconforming and at the point and time when
they are proposed for development or redevelopment it would be expected to comply with the
current requirements. From a Staff point of view, it is not consistent with the Historic District
Design Standards and Guidelines.
Mr. Liberman stated that on the site plan there would be a curb along the back edge so that vehicles
could not go totally onto the sidewalk in that area.
Mr. Scrafford stated that there needs to be something to differentiate between the sidewalk and the
parking area.
Mr. Malmberg stated that it is code compliance at the current time. The Public Works Department
reviewed the site entrance.
Mrs. Townshend stated that the Historic District Commission Design Standards and Guidelines
would recommend screening parking from the street.
Mr. Scrafford stated that they would want to create something that would be more secure other
than a hedge to prevent a vehicle from backing out of the parking lot onto the sidewalk.
Responding to Mr. Scrafford question regarding the wall to screen parking from Loockerman
Street in the twenty (20) foot area, Mr. Liberman stated that they had not decided on a location.
He stated that the benches were a part of the wall. With the screening of the wall it screens vehicles
from Loockerman Street, but would also present a vertical building type look to the corner and
minimize having to set the building away from New Street.
Responding to Mr. Scrafford question if the four (4) foot rule for fence height applied, Mrs.
Melson-Williams replied that the four (4) foot rule would apply as well as the corner visibility area
limitation that would drop the height to three (3) feet.
Mr. McDaniel stated that the concept is great for the brick wall, but it needs to be higher.
Responding to Mr. Fisher’s question if the parking lot elevation for the building will be the rear
and the door would be the loading dock area; Mrs. Townshend stated that on the building elevation
6
Page 8
CITY OF DOVER HISTORIC DISTRICT COMMISSION MARCH 21, 2013
the parking lot is from the rear. Also responding Mr. Liberman stated that there will be brick along
the alley. The personnel door can be moved to the backside to eliminate any conflict in the area.
Responding to Mr. McDaniel’s question if it was regular brick on the back south side of the
building; Mr. Liberman replied yes. Also responding, Mr. Scrafford stated that on the plans it
indicated block on the parking lot elevation with a brick water table and block on the rear elevation
facing the west wall. Mr. Liberman stated that they will be saving as much of the west wall as
possible.
Responding to Mr. Scrafford’s question regarding the downspouts and if the drainage from the
roof will be adjusted to accommodate the adjoining of the two (2) buildings; Mr. Liberman replied
yes.
Responding to Mr. McDaniel’s question if the windows were decorative windows; Mr. Liberman
stated that the windows will not be used to look out of. They may be able to add glass to the
windows at the corner on the Loockerman Street side.
Responding to Mr. McDaniel’s question regarding metal windows on Loockerman Street at the
Bayard Pharmacy; Mrs. Townshend stated that are some that you can see through. Also
responding, Ms. Cornwell stated that the windows are real and they are blocked with a gray look.
Chairman Scrafford questioned if there was any additional discussion.
Chairman Scrafford asked if there were any questions.
Mr. Scrafford declared the public hearing open.
Mr. Gary Patterson member of the Downtown Dover Partnership and Economic Development
Committee introduced the new Executive Director of Downtown Dover Partnership Mr. Lou
Colon. He also invited members to the Ribbon Cutting Ceremony on Loockerman Plaza on
March 28, 2013 at 10:30a.m. The Economic Development Committee endorses the new project
and hope that any concerns can be worked out. They are happy with the new facade on
Loockerman Street and the one that will face New Street.
Mr. McDaniel stated that he is a member of the Downtown Dover Partnership Board and he
abstained from voting on the application at their meeting.
Mr. Lou Colon, Director of Downtown Dover Partnership stated that he endorses and support the
project. It is designed for Downtown and it is a potential to bringing more employees to the
Downtown area.
Page 9
CITY OF DOVER HISTORIC DISTRICT COMMISSION MARCH 21, 2013
Mr. Mike Harrington of Harrington Realty in Dover stated that upon speaking with the architect
there is an eight (8) foot wide sidewalk. At the entrance there is twenty-six (26) feet from the
parking spaces to the curb which is also wide. There is enough space for parking and turning
around. He has represented thirty-five (35) years of service to tenants and landlords on
Loockerman Street. For the first time in his career, he has seen growth and energy Downtown.
The President of Wesley College was also excited about this project for the students and the E-Z
Pass project that will bring roughly sixty (60) employees Downtown.
There being no one else wishing to speak, Mr. Scrafford declared the public hearing closed.
Mr. Scrafford questioned if there were any questions, comments, or motion.
Mr. McDaniel commented that he reviewed other Family Dollar sites on-line in different Colonial
towns such as Williamsburg, Massachusetts, Chestertown, and Madison, Mississippi. He could
not find a Family Dollar that was not on a highway with a flat front. The fact that this project is
willing to come into town and use various materials shows a commitment. He stated that he likes
the way the building looks and the proposal including the parking.
Mr. Jackson was also in agreement with the proposal of the building. He stated that it was a great
start.
Responding to Mr. McDaniel’s question if My Place was a part of the project; Mr. Liberman
replied no. They responded to Staff comments as how it relates to the project.
Mr. Scrafford suggested a partial screening from Loockerman Street and New Street that will
embrace your vision when looking at the parking. This will prevent a car from going into the
sidewalk. The main concern is safety.
Mr. McDaniel moved to recommend to the Planning Commission approval of the Architectural
Review Certificate for the project as proposed to include demolition of the existing structure, the
recordation as specified in Staff recommendations #3 and #4, and with the conditions of possibly
planting street trees in the sidewalk area on New Street to provide some screening of parking,
include a low brick wall to screen the parking from Loockerman Street, and upright curbing
between the parking lot and sidewalk, seconded by Mr. Fisher and the motion was unanimously
carried 4-0. Mr. Salkin was absent.
Mr. Fisher moved to adjourn the meeting; seconded by Mr. Jackson and unanimously carried (Mr.
Salkin was absent).
Page 10
CITY OF DOVER HISTORIC DISTRICT COMMISSION
Meeting adjourned at 4:19 PM
Page 11
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
JUNE 20, 2013
The Regular Meeting of the City of Dover Historic District Commission was not held on
Thursday, June 20, 2013 at 3:00 PM as no quorum of the members was available at the meeting
time. Members present were Vice Chairman Salkin and Mr. Fisher. Mr. Jackson, Mr.
McDaniel, and Chairman Scrafford were absent.
Staff members present were Mrs. Melson-Williams and Mrs. Purnell.
No formal action was taken on any item, including the minutes of the previous meeting or any
votes on any particular item.
Mrs. Melson-Williams stated that Staff would answer any general questions regarding the
information provided to them.
The next meeting will be held on July 18, 2013.
Responding to Vice Chairman Salkin’s question if there was any item on the agenda that was
timely and should be discussed such as the “Update on Discussion-Role and Scope of the Historic
Commission and Historic District,” Mrs. Melson- Williams stated that all items on the agenda can
wait until the July meeting. It was a series of updates and there were no formal applications for
Architectural Review Certifications that needed to be considered today.
Meeting adjourned at 3:20 PM
Page 12
City of Dover Historic District Commission
Summary of Applications 2013
Updated thru June 1, 2013
PLAN NAME
HI-13-01 |Lands of Boyles:
$-13-03 |Parking Lot
Construction
Family Dollar
Capital City Trail
Project: Phase 2
Building Permits #13-
260 Referral for John
Bell House: Replica
Outhouse & Rear
Yard Fence
HI-13-05 |North Street Pocket
S-13-10 |Park
LOCATION
527-529 South State
Street
300 West
Loockerman Street
Between Martin
Luther King Jr.
Boulevard (Court
Street) and East
Loockerman Street
43 The Green
|
301 South Governors
Avenue
TYPE
|Construction of
parking lot east of
existing building
Demolition of existing
commercial building
(old NAPA) and
construction of 8,308
S.F. retail building.
Bike and Pedestrian
Improvements
Construction of
accessory structure
(Outhouse) and
Fence
Redevelopment of
vacant parcel as park
with paving and
\landscape areas.
ACTION
2/21/2013 HDC
Recommendation of Approval of
ArchRevCert with conditions.
Application S-13-03 reviewed by
PC and granted Approval of
ArchRevCert with conditions.
3/21/2013 HDC
Recommendation of Approval of
ArchRevCert with conditions.
Application S-13-12 reviewed by
PC and granted Approval of
ArchRevCert with conditions on
6/20/2013.
|Information Presentation
presented at HDC Meeting of
3/21/2013
Permit #13-260 referred to HDC
by City Planner for Architectural
Review Certification: 3/21/2013
HDC Approval of ArchRevCert.
Permit approved for issuance
Review of application pending
STATUS
Check Print of Site Plan
submitted 5/28/2013 for review.
Plan must receive all agency
approvals prior to Final Plan
Approval.
Check Prints of Site Plan must
be submitted for review and
Final Plan approval.
Documentation of building must
occur prior to demolition.
Phase 2 is currently in design.
Construction of Phase 1 trail
segment began in April 2013.
Permit ready to be issued.
Project not started yet.
Review by PRCE on 4/8/13 with
recommendation. 4/22/13 City
Council reviewed and referred
back to PRCE. Review by PRCE
on 6/10/2013.
Page 13
City of Dover Historic District Commission
Summary of Applications 2012
Status Updated thru June 1, 2013
PLAN NAME
Building Permit #12-0018
Referral
Johnson Victrola Museum:
Banner Program
Wesley U.M. Church:
Banner Program
Court Street Gateway
Enhancements of the East
Edge of The Green and
Court Street Promenade
Demolition of Building at 509
South State Street
Rear Plaza Improvements at
22-24 West Loockerman
Street
LOCATION
323 South Governors
Avenue - new location of
Frankfurt Bakery
375 South New Street
209 South State Street:
Banner location on
Fellowship Hall Building
fronting Loockerman Plaza
Court Street, east of
Legislative Hall
The Green
509 South State Street,
property owned by Christ
Church
22-24 West Loockerman
Street
TYPE
Exterior Walt Finishes for
Existing Building; Door &
Window Replacement
Placement of changeable
banners using frame
attachment system
Identification and Placement
of a changeable banner
location
Bike and Pedestrian
Improvements
Pedestrian and Landscape
Improvements and ADA
access to 55 The Green
Proposal for demolition of
the existing two and-a-half
story dwelling
Proposal for site
improvements to rear of
property adjoining North
street with paving and
landscapin:
|ACTION
1/5/2012 Permit #12-0018 referred to HDC
by City Planner for Architectural Review
Certification; 1/19/2012 HDC Approval of
ArchRevCert with Conditions. Materiat
revisions submitted to staff. Permit Issued
12/1/2012.
4/19/2012 HDC Approval of ArchRev Cert
with Conditions on banner installation.
4/19/2012 HDC Approval of ArchRevCert
with Conditions on banner size and
placement.
Information Presentation presented at HDC
Meeting of 7-19-2012
7/19/12 HDC Consultation on Referral of
Permit #12-816 with Recommendation of
Approval of ArchRevCert and Information
Presentation
9/20/2012 HDC conducted Public Hearing
and deferred action of the project seeking
additional information; 1/17/2013
Information Update and HDC retabled
application seeking additonal info;
2/21/2013 Additional Information presented
and HDC Approval of ArchRevCert for
Demolition with consitions
12/13/2012 HDC Recommendation of
Approval of ArchRevCert with conditions.
Application S-12-20 reviewed by PC and
grant Approval of ArchRevCert on
12/17/2012.
STATUS
Construction complete for exterior
finishes of brick front fagade and vinyl
siding on sides and new door and
window. Final Certificate of
Occupancy issued 12/19/2012.
Sign Permit issued on for first banner
on building. Banner installed.
Sign Permit issued on 4/23/2012 for
first banner on the Fellowship Hall
Building and Sign Permit issued on
5/29/2012 for first banner on State
Street fence. Banners continue to
change for events.
Project part of Capital City Trail.
Public Workshop held 11/14/2012.
Groundbreaking and construction
started April 2013.
Permit issued and construction
complete.
Documentation of the buidling
required to be completed. Listed as
Vacant Buidling. Must make
application for Demolition Permit.
Final Plan approval grantes. Permits
#13-248, 13-249, and 13-250 issued
3/15/2013. Project under construction
and final inspections not requested
et.
Page 14
Summary of Permit Application with Architectural Review Certification
2013 - Updated Thru 7-1-2013
| DATE
1/1/2013|
PERMIT #
12-1699
1/18/2013|12-1700
4/17/2013|
2/15/2013
2/27/2013]
2/4/2013
2/27/2013
3/14/2013
3/13/2013
12-1701
13-43
13-118
13-211
12-1560
12-1675
3/28/2013] 13-10
|
3/4/2013] 13-229
3/4/2013] 13-234
|LOCATION
|406 Federal Street, Biggs
Museum
|
406 Federal Street, Biggs
Museum
|414 South State Street,
Schmittiger & Rodriguez
Law Offices
|406 Federal Street, Biggs
Museum
|401 Federal Street,
| Townshend Building
132 West Loockerman
|Street, Golden Fleece
132 West Loockerman Street
Suite 109, Pure Luxury Salon
|147 South Governors
|Avenue, A Touch of Glass
501 South State Street,
|Christ Church
414 South State Street,
Schmittinger & Rodriguez
|Law Offices
202 West Loockerman
|Street, Bayard Pharmacy
|535 South State Street
TYPE
Temporary Sign Permit
Temporary Sign Permit
Roof Permit
Temporary Sign Permit
Building Permit - Interior
Renovations
Fence Permit
Sign Permit - Window Sign
|Sign Permit - Wall Sign
Sign Permit
|Roof Permit
Temporary Sign Permit
[Roof Permit
ACTION ON ARCHITECTURAL
REVIEW CERTIFICATE
Staff Approval
|Staff Approval
|
|
Issued without Staff Review
|Staff Approval
|Staff Approval
Staff Approval per Director
Staff Approval
Staff Approval
Staff Approval with conditions
|Staff Approval
|Staff Approval
Issued without Staff Review
NOTES
Sign installed for First Friday &
Family Movie Night 1/1-1/5/13 and
removed.
Sign installed for Family Movie
Night and February Sip&Shop 1/18-
2/2/13 and removed.
Permit appears to be the same as
Permit #13-10 which was reviewed
by staff.
Sign installed for Family Movie
Night 2/15-3/2 and removed.
Work on 1st and 2nd Floor Offices -
construction underway.
Replaced wood fence of Permit #09-
1634 with decorative black metal
fence 7ft. In height. Previous Permit
referred to HDC 10/15/2009. Metal
fence installed.
Sign installed.
Projecting Sign
Post and Panel Sign installed with
|bulb flowers as landscaping.
|Replacement of slate roof with a
polymeric slate tile roof. Roof
|completed.
"Now Open" signs installed for 60
|days.
Existing roof replaced with asphalt
|shingle roof
Page 15
Summary of Permit Application with Architectural Review Certification
2013 - Updated Thru 7-1-2013
DATE
3/15/2013|
3/15/2013
3/15/2013
3/19/2013
3/15/2013
3/14/2013
3/15/2013
3/28/2013)
3/27/2013)
3/27/2013
3/27/2013 |
|PERMIT #
13-248
13-250
13-265
13-322
13-353
13-354
13-355
LOCATION
107 North Street
22-24 West Loockerman
Street
22-24 West Loockerman
Street
2 N State Street, Offices of
Paradee Financial
235 West Loockerman
Street
231 West Loockerman
Street, Tresses Hair Studio
34 South State Street
28 North State Street,
Wesley College Streetscape
Project Phase 1: Parking Lot
406 Federal Street, Biggs
Museum
406 Federal Street, Biggs
Museum
406 Federal Street, Biggs
Museum
TYPE
Fence Permit
Fence Permit
Administrative Building Permit
| Building Permit - Renovations
Building Permit - Interior
Renovations (walls)
Sign Permit - Wall & Window
Signs
Demolition Permit - Accessory
Structure
Administrative Building Permit
Temporary Sign Permit
Temporary Sign Permit
Temporary Sign Permit
|ACTION ON ARCHITECTURAL
|REVIEW CERTIFICATE
|Staff Approval
|
HDC Recommendation on ARC; PC
| Approval of ARC; Applications Hi-11-
|07 and S-12-20; Staff issued permit
|HDC Recommendation on ARC; PC
Approval of ARC; Applications of HI-
|11-07 and S-12-20; Staff issued
|permit
| Staff Approval
\Staff Approval
|staff Approval
|Staff Approval
| Staff Approval as portion of parking
lot project impacts a property within
the Historic District but not visible
from public way. Project reviewed
under Site Plan S-11-13.
Staff Approval
Staff Approval
Staff Approval
NOTES
Associated with 22-24 West
Loockerman Street project (HI-11-
07 and S-12-20)
Rear Plaza Area Project under
construction. Final Inspections for
compliance not scheduled yet.
Rear plaza area project is under
construction. Final Inspections for
compliance not scheduled yet.
Renovations to siding, window, &
door on rear addition; only partially
visible from public way.
Construction underway.
Tenant space change of use to
retail. Project complete May 2013.
Permit issued.
Brick Shed demolished in rear yard
near alley after damage by vehicle
accident.
Project under construction
Sign installed for April First Friday
4/4-4/5 and removed.
Sign installed for Hair Affair 4/8-
4/14 and removed.
Sign installed for May First Friday
5/2-5/3 and removed.
Page 16
Summary of Permit Application with Architectural Review Certification
2013 - Updated Thru 7-1-2013
DATE
3/27/2013
3/27/2013
4/24/2013
4/8/2013|
5/16/2013
5/2/2013
5/2/2013
5/8/2013
5/8/2013
5/16/2013
5/17/2013
5/14/2013
5/16/2013|
PERMIT #
13-356
13-357
12-1363
13-285
13-449
13-455
13-546
13-582
13-590
13-617
13-622
13-631
LOCATION
406 Federal Street, Biggs
Museum
406 Federal Street, Biggs
Museum
35 Loockerman Plaza, Dover
Public Library
406 Federal Street, Biggs
Museum
202 West Loockerman
Street, Bayard Pharmacy
235 West Loockerman
Street, Tommy's Second
Hand Store
501 South State Street,
Christ Church
121 South State Street,
M&T Bank
54 South State Street,
|Presbyterian Church
315 West Loockerman
|Street
412 West Loockerman
|Street
9 East Loockerman Street,
Treadway Towers
303 West Loockerman
Street, Spiritual Botanical
World
TYPE
Temporary Sign Permit
Temporary Sign Permit
Sign Permit - Wall Sign
Building Permit - Phase 3:
Exterior Fagade Improvements
& Interior Renovations
Sign Permit
Sign Permit - Wall Sign &
Window Sign
Temporary Sign Permit -
Banner
Building Permit-Door
Replacement
Temporary Sign Permit -
Banner
Building Permit - Roof
Replacement
Building Permit - Chimney
Repair
Building Permit - Soffit and
Fascia Repairs
Sign Permit - Window Sign
ACTION ON ARCHITECTURAL
REVIEW CERTIFICATE
Staff Approval
Staff Approval
Staff Approval
HDC Recommendation on ARC;
Application HI-10-09; Permit Issued
by Staff
Staff Approval
|Staft Approval
Staff Approval
|staff Approval
Staff Approval
|Staff Approval since using same
|materials as existing
Staff Approval
|
Staff Approval
Staff Approval
NOTES
Sign to be installed for Museum
Gala 5/4-5/18 and removed.
Sign to be installed for June Sip &
Shop 6/6-6/7 and removed.
Sign installed over main entrance
canopy.
Permit issued. Construction
underway.
Permit issued.
Signs being installed.
Banner attached to existing posts
|behind brick wall for 5/2-6/2.
Banner removed.
Permit issued.
|Sign Instaled for VBS 5/8-6/15 and
removed.
Replace existing asphalt shingles
with asphalt shingles.
Permit issued.
Construction underway.
Sign installed prior to permit
approval - fee doubled.
Page 17
Summary of Permit Application with Architectural Review Certification
2013 - Updated Thru 7-1-2013
5/21/2013
5/22/2013
6/4/2013
6/4/2013
6/4/2013
6/3/2013
6/5/2013
6/5/2013
6/4/2013
PERMIT #
13-647
13-678
13-603
13-701
13-727
LOCATION
142 West Loockerman
Street
235 South New Street
151-181 Kings Highway SW,
Woodburn
151-181 Kings Highway SW,
Woodburn
151-181 Kings Highway SW,
Woodburn
207 West Loockerman
Street, Zuha Trend
108 East Water Street, First
National Bank of Wyoming -
Operations Center
144 Kings Highway SW,
Governor's Club Café
149 South Governors
Avenue, Rouge Boutique
TYPE
Building Permit - Renovations
Administrative Building Permit
- Wall Repair
| Building Permit - Accessibility
Ramp & Entry
Administrative Permit - Site
Improvements to Driveway &
Sidewalks
Building Permit - Fence
Sign Permit - Wall Sign
Sign Permit - Post Sign & Wall
Sign
Building Permit - Interior
Renovations
Sign Permit - Projecting Sign
ACTION ON ARCHITECTURAL
REVIEW CERTIFICATE
Staff Approval
No Planning Staff Review (Permit
noted as expedited due to
emergency repairs.
Staff Approval
|staff Approval
Staff Approval
+
Staff Approval
\staff Approval
|statf Approval
|staft Approval
|NOTES
Construction underway to repair
building corner and exterior wall
surface after vehicle accident.
Replacement in-kind.
Permit issued.
|Project location of north side of
House & Addition in area of limited
visibility. Construction underway.
Project using asphalt paving and
brick sidewalks to improve
circulation and handicapped
accessibility. Construction
underway.
Metal decorative picket style fence
3 feet in height to be installed along
street frontage.
Sign for Tux Rental. Permit Issued.
Signs installed.
Project complete.
Permit issued.
Page 18
Certified Local Governments
search
® Program
© search nps.gov
Historic Preservation
Grants Home
CLG Home
Become a CLG
CLG Contacts
& Statistics
CLG Annual
Reporting Forms
CLG Opportunities
State Coordinators
Login
State Statistical
Reports
Frequently Asked
Questions
Grants Training
Audit Information
History & Culture
http://www.nps.gov/history/hps/clg/faqs.html
Page | of 5
Notional Park Service
U,S. Department of the interior
Frequently Asked Questions
1. What are the Benefits of Being a CLG?
2. Where does funding for CLG grants come from?
3. What types of projects are eligible for CLG fun
4, What other criteria govern whether a local historic preservation project is eligible for funding?
5. How much money is there in a CLG grant?
6. Do CLG grants require a financial contribution from the CLG?
7. How do SHPOs notify CLGs of the availability of CLG grants?
8. What are the application procedures?
9. Who decides which applications are funded?
10. On what grounds may SHPOs decline to fund an individual CLG grant request?
11. When are proposals selected? 7
12. When can work begin?
13. How long does the grant last?
14, Can the time be extended?
15. When are the grant funds actually transferred to the CLG?
16. Does the CLG have to complete the project before being reimbursed?
17. Why is matching share required?
18. How can the grant be matched?
19. Can the time spent by CLG staff on the project be counted as match?
20. Can the services of volunteers be counted as in-kind match?
21, When used as match, how are volunteer services valued?
22, If a CLG chooses not to count volunteer services as match, does it still have to provide time records?
23. What other types of in-kind services can be counted as match?
24. What sort of reports must be turned in?
25. What sort of procedures must be followed when a local government uses CLG grant funds to pay for
consultants or contractors?
26. Can CLG grant funds be used to buy supplies or equipment?
27. How long must records on grant expenditures be kept?
28. Where can I find additional information on CLG grants?
1, What are the Benefits of Being a CLG?
The benefits to local governments from participating in the CLG program are numerous, While CLG grants generally
represent a relatively small amount of funds, they have often been used as seed money to attract funding from local
government or other sources. Also, in many cases, the products generated by CLG grants have provided credibility
to a fledgling local historic preservation program. Beyond being just a source of funds, the CLG program has helped
institutionalize historic preservation and give it legitimacy as a function of local government. Since the local
government staff working in the Program are often in the local planning office, the CLG program has helped forge
critical connections between historic preservation and land use planning. Similarly, the CLG program has led to
increased cooperation between local preservationists and the State Historic Preservation Office and resulted in a
strengthened statewide preservation network.
Return to Top
2. Where does funding for CLG grants come from?
Funding for grants to Certified Local Governments comes from the Historic Preservation Fund (HPF), a Federal grants
program appropriated by the U.S. Congress and administered by the National Park Service (NPS), which provides
financial support to State Preservation Offices (SHPOs). Under the provisions of the National Historic Preservation
6/11/2013
Page 19
Certified Local Governments Page 2 of 5
Act, as amended, SHPOs are required to award at least 10% of their annual HPF monies to CLGs in their State.
(Some States have additional State funds for CLGs.)
3. What types of projects are eligible for CLG funding?
HPF grants to Certified Local Governments have funded a wide variety of local historic preservation projects. Projects
eligible for funding and the criteria used to select them are developed yearly by each SHPO. CLG project types that
have been funded include the following:
+ architectural, historical, archeological surveys, and oral histories
+ preparation of nominations to the National Register of Historic Places
» research and development of historic context information
- staff work for historic preservation commissions, including designation of properties under local landmark
ordinances
- writing or amending preservation ordinances
+ preparation of preservation plans
+ publication information and education activities
+ publication of historic sites inventories.
+ development of publication of walking/driving tours
- development of slide/tape shows, videotapes
+ training for commission members and staff
+» development of architectural drawings and specifications
+ preparation of facade studies or condition assessments
+ rehabilitation or restoration of properties individually listed in the National Register of Historic Places or contributing
to a National Register historic district
Return to Top
4, What other criteria govern whether a local historic preservation project is eligible for funding?
There are two other factors: all CLG grants must result in a completed, tangible product and/or measurable result;
and atl must be carried out in accordance with the applicable Secretary of the Interior's Standards for Archeology
and Historic Preservation (a copy may be obtained from the SHPO).
5. How much money is there in a CLG grant?
The amount of money in a CLG grant must be large enough to have tangible results. Otherwise, there are no specific
Federal requirements regarding the amount of money SHPOs make available in individual grants to CLGs.
Consequently, the dollar amount of the grant depends primarily on the fundilig poticy set by each SHPO. Some
States try to award a grant to each CLG in the State every year. In general, the dollar amount of grants in these
States tend to be small, particularly if there are numerous CLGs. On the other hand, other States award relatively
few but larger grants. On a nationwide basis, CLG grants in 2001 ranged in size from $500 to $60,000.
6. Do CLG grants require a financial contribution from the CLG?
In most states, CLG grants are matching grants, i.e. recipients must provide a certain amount of cash or in-kind
services to be used in carrying out the grant project. Each SHPO determines how much, if any, match is to be
required. In most States, a 50/50, or "dollar-for-dollar" match is required. This means that for every dollar received
the recipient must provide a matching dollar in services, cash, or volunteer hours, as specified by State policy. (See
“How can the grant be matched?" below for more information.)
Return to Top
7. How do SHPOs notify CLGs of the availability of CLG grants?
SHPOs makes an annual mailing to each CLG, and each local government whose application for certification Is
pending, notifying them of the availability of CLG grant funds. Potential CLG applicants are informed of the total
amount of funds available. State priorities for funding, criteria to be used in selecting proposals to be funded (see
http://www.nps.gov/history/hps/clg/faqs.html 6/11/2013
Page 20
Certified Local Governments Page 3 of 5
below), a deadline for submitting requests, arid a written description of what must be included in applications for
CLG grants.
8. What are the application procedures?
Although application procedures and time frames vary from State to State, in general, the SHPO solicits grant
proposals from its CLGs in the Fall. Applicants then submit a Grant Application (or Subgrant or Project Proposal),
which describes the project and why it is needed, how the project is to be carried out and what its goals are, who will
be doing the proposed work and their professional qualifications, a proposed budget and project schedule, and the
specific products to be generated by the project. Applications are generally due at the end of the calendar year.
Contact your SHPO and the specific deadlines in your State. (Applicants should also determine what local procedures
and requirements, if any, must be satisfied prior to submitting a CLG grant application.)
Return to Top
9. Who decides which applications are funded?
Each SHPO sets its own funding priorities. In some States, greater weight may be given to one type of a project over
another. Among the factors typically used to rate grant proposals are compatibility with the broad goals of the SHPO,
urgency of the project, significance of the historic properties, geographic distribution of grant Funds, education and
public awareness potential, and the administrative and financial management capability of the applicant.
10. On what grounds may SHPQOs decline to fund an individual CLG grant request?
CLG grants are competitive. While all CLGs are entitled to submit proposals, not all may get funding. SHPOs may
decline to fund a proposal that does not adequately address the State's funding priorities, meet its selection criteria,
have access to necessary professionals, or be achievable within the time period allowed or the budget proposed.
However, States must base grant award decisions on the selection criteria included in the application instructions
and notice of grant availability. Additionally, SHPOs may choose not to fund a proposal if they have reason to believe
that the applicant does not have the necessary experience or financial resources to carry out the project or has not
performed satisfactorily on a previous CLG grant.
Return to Top
11. When are proposals selected?
—---- - —-—+-—Whiletime-frames vary, successful-applicants usually receive notification-in the Spring that their proposal-willbe- -
funded. In some States, recommendations about which proposals should receive funding by the professional staff of
the SHPO must be approved by the State Review Board or the State Historical Commission. An agreement between
the SHPO and the CLG stipulating the terms of the grant is generally signed in the Spring or Summer.
12. When can work begin?
Applicants for CLG funds must wait until the grant agreement between the SHPO and the CLG's chief elected local
official, or his or her legal representative, is signed before starting work on any project. Unless specifically authorized
in writing by the SHPO, costs incurred prior to execution of the written agreement will not be paid.
13. How long does the grant last?
The schedule for completing the project will be outlined in the grant agreement. Most CLG grant projects are
completed within 9 to 18 months. Projects undertaken with CLG grant funds must be completed in no more than two
years from October 1, the start of the Federal fiscal year of the year the funds are appropriated by Congress. Since
the grant agreement usually is not signed until the Spring after the start of the Federal fiscal year (depending upon
when Congress makes its appropriation), there is usually less than two years in which to complete the work. Multi-
year projects require applying for separate grants in successive years and performing the work in phases.
Return to Top
14. Can the time be extended?
If circumstances outside of the control of the CLG make the terms of the grant agreement unachievable, the
agreement may be modified or cancelled by mutual agreement between the SHPO and the CLG. For example, if
inclement weather interferes with field survey and prevents completion of the work specified in the grant agreement
within the time period stipulated, a limited time extension may be granted or the scope of work and budget
amended. However, extensions may not stretch the grant period beyond the two-year limit on the expenditure of
HPF monies. (See question above.)
15. When are the grant funds actually transferred to the CLG?
Most CLG grants are reimbursable grants. CLGs must first pay the project costs and then submit a request to the
SHPO for reimbursement. Consequently, the CLG must have enough money “up-front” to be able to carry the project
(including paying contractors) until it gets reimbursed. CLGs should learn the requirements and timing of the State's
reimbursement procedures before the project begins.
Return to Top
http://www.nps.gov/history/hps/clg/faqs.html 6/11/2013
Page 21
Certified Local Governments Page 4 of 5
16. Does the CLG have to complete the project before being reimbursed?
Not always. Depending on the type of project funded, many SHPOs allow CLGs to submit reimbursement claims on
an interim "milestone achieved" basis.
17. Why is matching share required?
In establishing a partnership between Federal, State, and local governments, the National Historic Preservation Act
requires that HPF grants be matching grants. Underlying this requirement is the need for each of the partners to
share the costs of historic preservation. Matching grants ensure that there is strong State and local commitment to
Projects and result in more historic preservation work being performed than if Federal funds alone were involved.
Return to Top
18. How can the grant be matched?
Grants can be matched in two ways: in cash or through in-kind services (often called "soft match") necessary to
achieve the required product. Generally, CLGs can combine these two types of match to meet the total amount
required, Match requirements, however, vary by State.
19. Can the time spent by CLG staff on the project be counted as match?
Yes. In most States, work on the project performed by the staff of the local government is considered part of the
overall cost of the project and can be counted as part of the CLG's match. Copies of time sheets and payroll printouts
are required as documentation of employee time devoted to the project. CLGs must include staff time in the project
budget, like any other cost, if they plan to claim it as match.
20. Can the services of volunteers be counted as in-kind match?
Yes. Many States allow services provided by volunteers, both professional and nonprofessional, to be counted as
match by CLGs. The work performed by volunteers must be a necessary part of achieving the products expected
from the project and cannot be more than half its total cost.
Return to Top
21. When used as match, how are volunteer services valued?
In order to claim volunteer services as in-kind match, CLGs must first establish the rate of pay for the type of work
performed by the volunteers. Often SHPO pay scales establish the maximum rate allowed for professionals. If a }
volunteer performs services outside his or her profession, the volunteer time must be valued at the Federal minimum
wage rate (for example, an archeologist stuffing envelopes would be valued at minimum wage rate). Also, as
evidence that volunteers contributed to the project, time records documenting each volunteer's time must be
submitted to the State.
22. If a CLG chooses not to count volunteer services as match, does it still have to provide time records?
No. In most States, documentation of volunteer time spent on a project is only required when the CLG wishes this
contribution to count as part of its matching share.
23. What other types of in-kind services can be counted as match?
Most States allow CLGs to claim as match in-kind services such as supplies (i.e., paper or film), developing
photographs, photocopying, office rent, clerical support, or certain administrative costs when these are donated to
the project by either the local government or a third party. When a CLG chooses to count these supplies or services
as match, documentation is required. If grant funds could have been used to pay for a particular item had it not
been donated, then the donation will usually be allowable as a matching share contribution.
Return to Top
24. What sort of reports must be turned in?
Progress reports are usually required on an interim basis. These reports must include a description of what has
actually been accomplished and spent to date, SHPOs set the format for these reports and require preliminary
products, as appropriate. A final project report is also required upon completion of the grant.
25. What sort of procedures must be followed when a local government uses CLG grant funds to pay for
consultants or contractors?
Hiring consultants or contractors to perform part of the project must be done in accordance with acceptable State-
established competitive procurement procedures compatible with Federal requirements (and with whatever local
procedures apply). Frequently, existing State and local government procedures that meet these requirements are
used. A certain number of qualified firms or individuals must be contacted to ensure a fair, open, and competitive
selection process. Generally, at least three price quotations or bids must be obtained and the process must be
documented. Architects, historians, or other professionals must meet qualification standards set by NPS. Selection
may be based on experience, qualifications and cost, rather than cost alone. In many States, the SHPO requires that
the CLG consult with it before consultants or contractors are selected.
http://www.nps.gov/history/hps/clg/faqs.html 6/11/2013
Page 22
Certified Local Governments Page 5 of 5
26. Can CLG grant funds be used to buy supplies or equipment?
Yes. Most local, State, and Federal regulations require price comparisons and a competitive selection process in
purchasing equipment, negotiating a lease, or procuring nonprofessional services. Generally, State and local
procurement regulations apply. Some SHPOs require grantees to request prior approval for purchases greater than
$500 in value.
Return to Top
27. How long must records on grant expenditures be kept?
The grant agreement usually specifies records requirements. Documentation relating to the fiscal aspect of any grant
project usually must be kept for a minimum of three years after the date of receipt of the last payment (i.e.
reimbursement under a CLG grant), or until an audit for the grant period is accepted.
28. Where can I find additional information on CLG grants?
Your SHPO can answer any questions you might have. Many SHPOs have a grants manual describing the procedures
used in that State for applying for and administering CLG grants (including any additional State requirements beyond
those described in this brochure). Click here to find the STATE HISTORIC PRESERVATION OFFICE in your State.
Return to Top
Freedom of Information Act Privacy Policy Disclaimer Accessibility USA.gov
http://www.nps.gov/history/hps/clg/faqs.html 6/11/2013
Page 23
ARCHITECTURAL REVIEW STAFF REPORT
Before Dover Historic District Commission
July 18, 2013
Application: North Street Pocket Park at 301 South Governors Avenue
Architectural Review Certification HI-13-05
Site Plan S-13-10
Project Location: Southeast corner of North Street and South Governors Avenue
Property Addresses: 301 South Governors Avenue
Tax Parcel: ED-05-077.09-04-36.00-000
Owner: City of Dover
Present Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
Existing Uses: Vacant Lot (previous building demolished)
Proposed Uses: Park consisting of landscaping and paving improvements
Site Area: 3,150 S.F.
Project Description:
The Historic District Commission will act on a recommendation to the City of Dover Planning
Commission for an Architectural Review Certificate for the North Street Pocket Park at 301
South Governors Avenue. A Site Plan has also been filed for review by the Planning
Commission.
This application consists of a project involving the construction of a pocket park consisting of
paving and landscape areas to be located at 301 South Governors Avenue. The property is zoned
C-2 (Central Commercial Zone) and is subject to H (Historic District Zone). The property is
located on the southeast corner of West North Street and South Governors Avenue.
Previous Applications:
This property previously included a three story brick and stucco building (pre-1859) that was the
subject of applications appearing before the Historic District Commission and other City entities in
recent years. The previous building on the property was Declared Demolition by Neglect on June
10, 2010 by the Historic District Commission (Application HI-10-01) and given 90 days to take
action to repair the building. When no action was taken by the previous property owner, the
Historic District Commission recommended the Building Inspector begin the “Dangerous Building
proceedings. The building was declared a “Dangerous Building” by City Council on October 25,
”
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 24
HI-13-05 North Street Pocket Park at 301 South Governors Avenue
Architectural Review Staff Report for Historic District Commission
Prepared for July 18, 2013 Meeting
Page 2 of 6
2010 and ultimately demolished by the City in the Spring of 2011 (Demolition Permit #1 1-143).
Following City Council approval on October 22, 2012 to pursue establishing a pocket park on the
property, the City acquired the property in late Fall 2012 at Sheriff’s sale due to a City tax
delinquency.
The City of Dover Parks, Recreation & Community Enhancement Committee (PRCE) reviewed
the proposal for the establishment of the park on April 8, 2013 and recommended approval of a
pocket park design with appropriate screening for the neighbors and a recommendation to
include a tribute to the victims of domestic violence. Upon review of this recommendation on
April 22, 2013 the City Council referred the matter back the PRCE Committee to allow other
interested organizations to submit proposals. At the PRCE Committee meeting of June 10, 2013,
the Committee recommended approval of the basic design concept for the pocket park and the
City Council approved the basic design concept for the pocket park on June 24, 2013. (Note: No
action has been taken to approve the installation of tributes, monuments, memorials, etc. in the
pocket park.)
Property Information:
The project site is located with the local Historic District Zone (H) and subject to the provisions
of the Zoning Ordinance, Article 3 §21 and referenced sections.
This property is located within the boundaries of a National Register Historic District,
specifically the Dover Green Historic District. Provided below is the description of the previous
building that existed on the property prior to its demolition in 2011. The description is from the
building inventory listing found within the National Register of Historic Places nomination
completed for the Dover Green Historic District.
K-394.30 - 301 South Governors Avenue — Mid 19" century; brick, 3 story, 3 bay. This structure
has a low pitched gable roof with a dentiled cornice. There is a 2-story, 1 bay south section with a
lean to roof. The exterior is stuccoed. There is a protruding pediment above the door. On the
second floor is a rectangular oriel. It has elaborate cornice brackets and modillions, as well as
three support brackets with pendants. The Sanborn insurance maps indicate that the oriel was
added between 1897 and 1919. (c)
A series of historic maps was reviewed by Planning Staff for preliminary information on this
corner of South Governors Avenue. The 1859 A.D. Byles Map of Kent County (Dover insert)
shows at the southeast corner of the intersection of South Governors Avenue and North Street a
large building directly at the corner with a smaller detached building to the east. It is labeled
“Delewarian.” The 1568 Beers Map published by Pomeroy & Beers also shows a large building
at the corner and a smaller building to the east along North Street (no label as to property owner).
The 1885 Bird’s Eye View of Dover shows a multi-story building at the corner with a smaller one
story building to its east. The series of Sanborn Fire Insurance Maps would also be a reference
source for information on the series of buildings/building additions which occupied this property
over time. Additional research using other primary and secondary source documents would
provide more information on the history of the property, previous buildings, and the owners.
Page 25
HI-13-05 North Street Pocket Park at 301 South Governors Avenue
Architectural Review Staff Report for Historic District Commission
Prepared for July 18, 2013 Meeting
Page 3 of 6
PROJECT PROPOSAL (Drawings as updated 6/10/2013):
The Site Plan proposes improvements to the existing vacant lot to create a small park.
Improvements are proposed as paving system of concrete and brick pavers along with landscape
planting areas. The elements of the pocket park project are as follows:
1. Sidewalk: A new brick sidewalk is proposed along the street frontage of South Governors
Avenue. The sidewalk along the North Street frontage of the property was part of the
improvements (new brick and concrete surfaces) constructed as part of the North Street
Area Improvement Project (HI-11-05, C-11-07, S-12-04).
2. Paving: Improvements are proposed to consist of a patterned system of concrete and brick
pavers to create a paved plaza-like area that is accessible from both streets. A circular
brick area with alterative colored wedge is set in a concrete paved area.
3. Landscaping: A raised brick planter is proposed at the property corner at the intersection
of South Governors Avenue and North Street. A curved raised brick planter with four
trees is centered on the site framing the western edge of the landscape planting area is
proposed on the southeast side of the property along the east property line. The landscape
planting area appears to consist of hedge shrubs and low ornamental plantings. Another
curved raised brick planter forms the northern edge of the landscape planting area near
North Street. The type of ground cover (grass, mulch, plantings, colored stone, etc.) for
the landscape area is not specified. The specific varicties of plantings are not listed.
4. Site Furnishings: Several light bollards are placed at the edges of the landscaped area.
There are existing street lights along both adjoining streets. There appears to be a brick
cube/pillar (unknown dimensions) at the northern end of the center curved planter.
The overall project for this pocket park strives to follow the design and planning strategies
outlined in the Dover Transit Center Neighborhood Plan and Design Book. The Neighborhood
Plan suggested that a network of civic squares, open spaces, and public gathering places be
created to provide greater connectivity between activity centers and for design concepts focus on
improvements to the pedestrian movement and experience. The Neighborhood Plan suggests
paving improvements, trees, benches, etc. throughout the Downtown.
Review of DESIGN STANDARDS AND GUIDELINES
The subject project site is located in the Dover Historic District Zone within The Green Historic
Context. The Green Historic Context is described on pages 2-3 through 2-5. Location within the
Dover Historic District Zone requires proposals for demolition, new construction, additions, and
certain renovation or rehabilitation activities to existing buildings to receive an Architectural
Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone,
an Architectural Review Certificate will be granted “if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement location and materials affecting the
exterior appearance are generally in harmony with neighboring structures and complementary to
the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2,
3
Page 26
HI-13-05 North Street Pocket Park at 301 South Governors Avenue
Architectural Review Staff Report for Historic District Commission
Prepared for July 18, 2013 Meeting
Page 4 of 6
the Historic District Commission will provide a recommendation to the Planning Commission
regarding the project’s compliance with the architectural review standards.
This proposal should be reviewed for conformity with the design criteria and development
guidelines found in the Design Standards and Guidelines of Chapter 3: Maintenance, Repair,
Preservation, and Restoration of Existing Historic Buildings. More specifically the sections on
Design Guidelines for Landscaping and Site Amenities, Fencing and Walls, and Paving and
Bordering found on pages 3-24 through 3-27. These guidelines highlight the consideration that
should be given to the setting and the areas surrounding buildings including the choice of
materials. It notes that fences in the Historic District should not exceed four (4) feet in height.
Also while not specific to park areas, the Design Guidelines recommend that 20% of parking lots
(another type of paved area) should be unpaved and planted.
STAFF COMMENTS AND RECOMMENDATIONS
The following are Staff comments and recommendations for this application regarding project
activities and Architectural Review Certification.
1) Staff recommends conditional approval of the Architectural Review Certificate for the
concepts presented for the North Street Pocket Park (plan drawing dated 6/10/2013). This
recommendation is made subject to the following comments and suggested revisions.
2) The following conditions are recommended by Staff to improve project’s compliance
with the recommended guidelines of the Design Standards and Guidelines. The following
are recommended conditions:
a. The brick sidewalk areas along the streets must maintain an accessible width to
allow pedestrian travel around items such as street lights, signage etc.
Adjustments to the raised planter bed at the corner may be necessary to allow for
safer and better circulation on the adjacent sidewalks.
b. Any light fixtures/poles utilized on the property for site lighting should utilize a
black finish color.
Utilize black posts for any signage elements to be attached to posts.
d. Aclear edge for any mulch, stone, etc. areas must be established along the
property lines.
e. Add benches for seating. Several curved benches could be placed along the edge
of the brick circle facing west/northwest. This will also assist in preventing
misuse of the raised planter bed edge in this area.
f. Remove the brick cube/pillar element as it does not seem to fit the character of
this park.
7
3) Some of the site improvements/amenities were not specifically described with the
application information or need to be clarified. Please provide information for
consideration and discussion.
a. Clarify the paving surface material for wedge area of brick circle.
b. Clarify the height of and the flat surface dimension of the raised planting beds. An
edge treatment may be necessary to limit misuse of the planters.
Page 27
HI-13-05 North Street Pocket Park at 301 South Governors Avenue
Architectural Review Staff Report for Historic District Commission
Prepared for July 18, 2013 Meeting
Page 5 of 6
4)
5)
6)
i)
8)
9)
c. Clarify the surface treatment (lawn areas, plantings, type of mulch, stone, etc.)
within the landscape areas.
d. Clarify the status of the existing curb cut on North Street.
e. The plan provides limited information on the project’s strategy for stormwater
management. Any changes to address this may impact the park’s paving and
landscaping designs.
f. Ensure that tree planting locations and landscape plantings do not conflict with
existing or proposed utilities. There are several utility cabinets near the northeast
corner of the site.
g. Provide adequate grading on this site for drainage ensuring drainage is away from
the adjacent structures on adjoining properties.
Staff recommends the addition of a bicycle parking rack on the property to provide a
parking location for this type of transportation mode. It will also help to avoid the
impromptu chaining of bicycles to other site features like trees, fences, or signs. The
bicycle parking rack should be black in finish color. The post and loop style parking
bollard utilized in other areas of the Downtown would be appropriate.
For corner lots such as this, walls and fences are limited to a maximum height of three (3)
feet within the corner visibility area (triangle) as per Zoning Ordinance, Article 5 §1.3. It
is noted that in consideration of the Architectural Review Certification, the Historic
District Commission cannot grant relief from the comer visibility height limits.
a. Additional information is needed to confirm if the raised planter and its plantings
are in compliance.
Coordination with the adjacent property owners regarding any remaining fencing or
landscaping along the adjoining property lines will be necessary. Documentation of their
concurrence with the installation or removal of such elements, provisions for shared
usage, and/or any maintenance agreements may be required.
Staff recommends the addition of a black metal decorative fence three to four feet in
height along the southern property line to connect the wooden gate and the existing
wooden fence. The applicant may wish to discuss other options for this fenceline with the
adjoining property owner. Any fences must comply with the Design Standards and
Guidelines.
The proposed landscaping including tree plantings and landscape plantings should be
completed with native species appropriate to the site conditions of an urban area and for
ease of maintenance. Consultation with the City’s arborist regarding the tree species and
plantings selected is recommended.
The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on the property. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing
with archaeological resources including previous studies at the subject location.
10) In the event, that major changes and revisions to the design, materials, or site layout occur
5
Page 28
HI-13-05 North Street Pocket Park at 301 South Governors Avenue
Architectural Review Staff Report for Historic District Commission
Prepared for July 18, 2013 Meeting
Page 6 of 6
in the finalization of the plan and/or construction drawings contact the Department of
Planning and Inspections. These changes may require resubmittal for review by the
Historic District Commission.
11) The plan for this project is also subject to the application and review process for Site
Development Plan (Article 10 §2 of the Zoning Ordinance) before the Planning
Commission. Note: Additional technical items for compliance with the Zoning Ordinance
and other regulations may be identified during the Plan Review Process.
a. Currently, the project is only presented in a graphical format. A Site Plan
including the appropriate data column, plan drawing, and details must be provided
to complete the Site Plan review process.
12) The applicant shall be aware that the Building Permit for the project is required to track
the construction activities on the property. The permit applications must comply with the
approvals and conditions granted through the Architectural Review Certification and Site
Plan Review process.
Historic District Commission Action Required
The Historic District Commission shall consider the proposal and provide a recommendation to
the Planning Commission in regards to the Architectural Review Certification for the project site
development plan. The recommendation should reflect consideration of the Design Standards
and Guidelines.
Page 29
2013-2017 Delaware’s Historic Preservation Plan:
Preserving Our Past for a Better Future:
http://history.delaware.gov/preservation/planning.sthtml
e Acopy of this document was forwarded to the Historic District
Commission members for the June 20, 2013 meeting.
e If you have questions or required additional copies of the materials,
please contact Planning Staff at 736-7196.