A Special Council Meeting was held on May 29, 2013 at 6:05 p.m. with Council President Bonar
presiding. Council members present were Mr. Dixon, Mr. Lynn, Mr. Perza (departed at 7:07 p.m.
and returned at 7:14 p.m.), Mr. Slavin, Mrs. Williams (departed at 7:43 p.m. and returned at 7:48
p.m.), Mr. Hare, and Mr. Hutchison. Mr. Anderson was absent.
Council staff members present were Mr. Koenig, Mrs. Mitchell, and Mrs. McDowell. Mayor Carey
was also present.
AGENDA ADDITIONS/DELETIONS
By unanimous consent, the agenda was adopted as presented.
INTRODUCTION AND PRESENTATION
Mr. Scott Koenig, City Manager, thanked those in attendance for coming to take advantage of the
budget presentation outlining the proposed FY14 spending plan and how staff plans to finance the
plan. He stated that over the past several months, Mrs. Donna Mitchell, Controller/Treasurer;
Ms. Tracey Lisiecki, Financial Accounting and Reporting Manager (Finance Department), and all
department heads have worked very diligently to prepare a spending plan which meets the needs of
the City for preparing and executing basic municipal services. He stated his opinion that there are
not extravagant items in the plan; it addresses the basic level of services that have been provided
over the years in the City of Dover and infrastructure needs for the future.
Mr. Koenig reminded members that, earlier this year, staff was anticipating a budget deficit in the
General Fund of approximately $720,000 and tonight staff will map out how the budget has
progressed since that time.
Mr. Koenig advised members that the proposed spending plan for FY 14 is approximately $132M
and reviewed a presentation entitled “City of Dover Fiscal Year 2014 Proposed Budget: Highlights
of Overall Budget, May 2013” (Pages 10-19 of the meeting packet), which included information on
Revenue Changes, Financial Policies, items that were Applicable to All Funds, the General Fund,
Property Taxes, a Computation of the Legal Debt Margin, the Water/Wastewater Fund, and the
Electric Fund.
In regard to the Electric Fund, Mr. Koenig stated that staff proposed an overall rate reduction of
11%, primarily driven by the cost to purchase power and the continued decline of buying power off
the PJM grid. The City is currently in a position to reduce electric rates for both residential and
commercial customers, which he hoped will lead to changes in the local economy in the long-term.
Mr. Koenig informed members that staff would be bringing forward proposed changes to the City’s
fiber leasing policies to emulate the current market rate.
With regard to Financial Policies, Mr. Koenig stated that all budgets were balanced, with current
revenues equal to or greater than the current expenses as per the policy, with the exception of the
General Fund. He reminded members that in January of this year, staff anticipated a $700,000 gap
in the General Fund and signaled the possible necessity for a property tax increase. However, since
that time, staff reviewed the FY14 draft budget, “combed through” the FY13 budget, and
Page 2
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 2
recommended moving savings in the FY13 General Fund Budget in the amount of $632,000 from
various department and fund expenses to help balance the FY14 General Fund Budget. He
explained that the savings have primarily resulted from the number of outgoing employees being
greater than the number of new hires during the past year.
Regarding items that were applicable to all funds, Mr. Koenig stated that staff budgeted in
accordance with the contracts for both the Fraternal Order of Police (FOP) and Dover Organization
of Employees (DOE), and that the FY14 Budget does not address contracts for the International
Brotherhood of Electrical Workers (IBEW) or American Federation of State, County, and
Municipal Employees (AFSCME) because those contracts have not been signed. He informed
members that the IBEW negotiations had not concluded and that the first negotiation session for
AFSCME had not yet started.
In response to Mr. Lynn, Mr. Koenig clarified that the proposed 3% increase for non-bargaining
employees did not include those positions included in the AFSCME petition because any wage
adjustment would be considered during the contractual negotiations.
Mr. Koenig clarified that the $70,000 amount represented the proposed 3% increase for
non-bargaining employees.
Mr. Koenig stated that the IBEW was the only group of employees not included in the 15% cost
sharing for health care and that the IBEW contract was currently being negotiated.
In response to Mr. Lynn, Mr. Koenig confirmed that all non-bargaining employees were included
in the proposed 3% increase, with the exception of the City Manager, regardless of whether they
were provided an increase during the past 12 months. Mr. Koenig stated that increases that were
granted were based on positioning as it existed at the time and that the 3% is the “look forward” into
FY14.
Mr. Koenig explained that in an effort to better manage the budget, vacation sell-back, retirement
payouts, and education assistance expenses were removed from Department/Division budgets by
transferring the estimated cost to a fund expense. He stated that in previous years, these expenses
were over-budgeted for and that this change resulted in a reduction of $110,000 in the General Fund.
In regard to the expectation for the continuation of low revenue growth in the General Fund,
Mr. Koenig reminded members that the City’s revenues are tied to the construction market. When
the construction economy is slow, the City experiences slow revenues related to realty transfer taxes,
as well as for permits, such as building and plumbing, which are the revenues that make the
difference between the City having a balanced budget versus a budget gap.
Mr. Koenig explained that the proposed increase of $150,000 to address the issue of credit card fees
was due to the City regressing back to taking individual credit card payments directly instead of
utilizing a third-party payer because staff believes it will help with revenue collection and keeping
people timely with payments, which has been a concern during the last few months.
Page 3
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 3
In regard to the Water/Wastewater Fund, Mr. Koenig explained that revenues were projected lower
as a result of a reduction in sales. He stated that these revenues are projected to remain relatively
flat over the long run, until the Calpine project is realized and staff can fully assess the amount of
water and sewer the Calpine project will purchase from the City.
Mr. Koenig stated that the Kent County treatment fees were projected to decrease by 2% due to the
expectation that the flow to Kent County will go down by approximately 2% as a result of
improvements related to the City’s Inflow and Infiltration (I & I) Program as well as the changes
in the use profile of sales.
Mr. Koenig informed members that the largest change in revenues and expenses was in the Electric
Fund, with a projected overall revenue decrease of 11.3% and expense decrease of 10.8% to
coincide with cost of service changes.
In response to Mr. Slavin’s question regarding the absence of changes in the budget for Electric
Department personnel, Mr. Koenig stated that at the managerial level there were currently three (3)
vacant positions: Director, Engineer II, and Line Crew Superintendent; however, these position were
budgeted to be filled in FY13 and that the proposed FY14 budget includes salary and benefits for
all three (3) positions. In addition, Mrs. Mitchell stated that the savings from the positions in FY13
will carry into FY14 but will not create a problem with FY15 because funds from the Rate
Stabilization Reserve would be pulled back into the Electric Fund to cover the reduction in rates;
therefore, the savings from FY13 will actually help cover the rate reductions and less could be taken
from the Reserve.
In response to Mrs. Williams, Mrs. Mitchell confirmed that the .5% difference between the 11.3%
revenue decrease and the 10.8% expense decrease would be handled by the Rate Stabilization
Reserve.
Responding to Mr. Hare, Mrs. Mitchell confirmed that the revenue increase offsets the increase in
expenses for Police Extra Duty.
In response to Mr. Hare, Mr. Koenig stated that the Code requires the property tax assessment to be
performed every three (3) years and the next full assessment will be completed in FY15.
Mr. Koenig reviewed the “City of Dover Rate & Fee Trends (Updated 5/21/13)” (packet Page 19)
and emphasized that although the City had not changed the tax rate for several years, there were
defacto tax increases in the FY05/06 and FY10/11 budgets related to the reassessments. He
reminded members that reassessments are required to be revenue neutral through a “roll back.” He
stated his understanding that during these fiscal years, the City did not do roll backs; therefore, while
the rate stayed the same, there was an increase in overall taxation based on changes in the
assessments.
Mr. Slavin questioned the transfers from the Electric Utility and the change in the Water/Wastewater
Utility from a percentage to a flat rate in FY13. In response, Mr. Koenig stated that originally 8%
of total revenue was being transferred and that one (1) year the amount was approximately $8.8M;
so, last year, staff proposed a flat rate of $8M across the board over a five (5) year modeling period
Page 4
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 4
to stabilize the amount of revenue coming into the General Fund. This was accomplished to help
staff better project the cash flow into the General Fund. Additionally, the total electric revenues
have been decreasing steadily because the cost of purchased power has decreased. Mr. Koenig
explained that while the percentage is fluctuating now, the decision to change to a flat transfer was
a good financial move because it helped the City’s financial policy and assisted in meeting some of
the goals of the Governor’s Office. Elaborating, Mr. Koenig explained that, in talking with the
Governor’s Office and the State regarding local rates, one (1) of the things they wanted to see was
consistency, so tagging it at a flat $8M over the five (5) year model helped convey to them that the
City would consistently transfer that amount of money. The State did not seem as concerned about
the percentage of fluctuation as they were in knowing how much the City would transfer to other
services to offset tax rates.
In response to Mr. Slavin’s question regarding the equivalent percentage amounts for the transfers
from the Electric Utility and the Water/Wastewater Utility in FY14, Mrs. Mitchell stated that this
would equate to 9.6% for Electric and 3.6% for Water/Wastewater. She noted that prior to last year,
the policy percentages were 8% for Electric and 4.5% for Water/Wastewater. Mr. Slavin expressed
his opinion that it would also be important to keep the number as a percentage in order to track the
amount that the City is profiting from the Electric Utility to offset General Fund expenses.
Mrs. Mitchell also advised members that during the Financial Forecast presentation, scheduled for
the latter part of the meeting, she would discuss the Water/Wastewater because the numbers for the
Calpine project still need to be worked up; however, she anticipated that this would add some
revenue to the Water/Wastewater Fund. She stated that she had discussed with Mr. Koenig the
possibility of increasing the transfer from this fund and plans to present a revised forecast to Council
in approximately three (3) months.
Referring to Page 15 of the meeting packet regarding pay in lieu of taxes (PILOT), Mrs. Williams
questioned the disparity between the amounts paid by the State Housing Authority and the Dover
Housing Authority as well as various other organizations. Responding, Mr. Koenig stated that the
PILOT paid by St. Andrew’s Episcopal Church and Luther Towers is voluntary and that he would
research how the amounts for the housing authorities were determined and provide that information
to members.
In response to Mr. Slavin, Mr. Koenig confirmed that current salary and benefit amounts are
included in the proposed budget for IBEW and AFSCME positions.
Mr. Lynn expressed his opinion that it seemed fundamentally unfair to budget 3% for non-unionized
supervisory staff, who are prohibited from unionizing pursuant to regulations of the Public
Employment Relations Board (PERB), but not consider the AFSCME union employees, who have
not had a pay increase for three (3) years. He questioned how much a 3% increase would cost and
where the funds would come from if a 3% increase were negotiated for these employees.
Responding to Mr. Lynn, Mr. Koenig stated that the cost is yet to be determined because it has not
been negotiated and that he would develop a plan before a contract would be brought forward for
Council’s consideration. He stated that the money would come from the General Fund and the
Water/Wastewater Fund.
Page 5
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 5
In response, Mr. Hare stated that those employees in the AFSCME union made the decision to
unionize to conduct negotiations and indicated that they may not negotiate 3%. He expressed his
opinion that the AFSCME negotiations should not affect the non-bargaining employees at all.
Responding, Mr. Lynn stated that experience reveals that the City has not been successful in
litigating these matters at PERB and the City should expect some kind of pay increase, whether it
is given voluntarily through negotiations or won through PERB litigation, similar to what has
happened previously.
Referring to the “City of Dover Rate & Fee Trends (Updated 5/21/13)” (packet Page 19),
Mrs. Mitchell advised members that after the City first came off the Duke Energy contract in FY07
there was a 35.3% cumulative increase in customers’ electric rate and the rate went as high as a
53.5% increase in FY10. However, with the latest round of Power Cost Adjustment (PCA) credits
and the last two (2) rate reductions, the rate is at 35.5%, which is nearly back to same level in effect
following the end of the Duke Energy contract, which she expressed as very good news for the
customers.
SUMMARIES OF FUND REVENUE AND EXPENSES
Mrs. Donna Mitchell, Controller/Treasurer reviewed a presentation entitled “City of Dover FY 2014
Draft Budget: Total Budget & Fund Summaries” (Exhibit #1). She explained that this information
was included in the packet beginning on Page 21; however, the presentation included line
numbering.
Mrs. Mitchell explained that Page 2 of the presentation included the revenues and transfers in and
expenses and transfers out by fund, the beginning and ending budget balances for each fund, the
Reserves, and the Other Funds (Lines 28-32) which are considered non-major funds. She stated that
the Interfund Transfers on Line 25 are the transfers between funds, which include the transfer from
the utilities to the General Fund, as well as the Operating Fund transfers made to the Capital Project
Funds to fund the projects.
In response to Mr. Slavin, Mrs. Mitchell explained that the General Fund Operating Fund (Line 2)
reflected a higher beginning than ending balance, confirmed that this did indicate that there is
overspending in the General Fund by approximately $500,000, and reminded members that the City
Manager explained in his previous presentation that all of the budgets balanced, with current
revenues equal to or greater than the current expenses as per the policy, except the General Fund.
General Fund
Referring to the Cash Receipt Summary (Page 3), Mrs. Mitchell indicated that the Police Extra Duty
(Line 9) was running higher that expected for FY13, was increased from $494,400 to $636,100 in
the revised FY13, and was budgeted at $650,000 for FY14. She stated that these increases were
based on the actual receipt of $478,000 as of April 30, 2013.
Mrs. Mitchell also noted that the cash receipt budget for Property Taxes (Line 10) was increased in
the revised FY13 budget and that this trend was continued in the FY14 budget, stating that the as
of April 30, 2013 the actual receipt of $11,051,000 exceeded the original budget.
Page 6
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 6
In regard to the Rent Revenue cash receipt budget (Line 15), Mrs. Mitchell stated that the revised
FY13 and FY14 budgets reflect an increased amount because the Calpine lease for the Garrison
Farm was inadvertently omitted from the original FY13 budget.
Mrs. Mitchell explained that the increase in budgeted cash receipts for Court of Chancery Fees
(Line 16) was based on the FY13 trend as of April 30, 2013.
Mrs. Mitchell stated her concern regarding the Transfer Tax, explaining that the revised FY13
budget was kept at $1,370,000 based on fairly high one-time receipts; however, the actual receipt,
as of May 24, 2013, was $1,043,000.
Mrs. Mitchell also expressed concern in regard to the Civil Traffic Penalties (Line 34) cash receipt
for FY13 which was budgeted at $750,000, revised to $350,000 because some cameras were down
but brought back for FY14 because the cameras were now functioning, but as of March 31, 2013
the actual receipt was $223,000. She stated that these receipts run behind and expressed her hope
that they improve.
Responding to Mrs. Williams, Mrs. Mitchell stated that there are no impact fees in the General
Fund; the impact fees are in the Water/Wastewater Fund.
In response to Mr. Slavin’s question regarding the 29.6% change in the carry forward balance in the
General Fund, Mrs. Mitchell explained that the fiscal policy for the carry forward balance states that
the budget balance should be a minimum of 8% and a maximum of 12% and confirmed that when
the balance exceed policy, funds are diverted to cover one-time expenses.
Mrs. Mitchell reviewed the Expense Summary on Page 4 of the presentation. Referring to Other
Expenditures, Lines 29-42, she stated that the Debt Service was one (1) of the savings previously
highlighted by the City Manager. She reminded members that the FY 2013 Budget included $2M
to be financed for the Garrison Park infrastructure; however, since the budget was adopted, she
submitted a recommendation to Council to use the Future Capacity Reserve for the Calpine project,
which resulted in a change to the debt service figures. In addition, she stated that the FY 2013
Budget included an amount for debt service based on the assumption that the City would be paying
the library loan all year; however, this was an interest only loan until it locked in during the week
of May 20, 2013. Since the City did not have to bear the full brunt of the debt service, this was
reduced, which provided savings in FY 13 as well as FY 14 due to funding the Garrison
infrastructure for the Calpine project with Future Capacity Reserves.
In response to Mrs. Williams, Mrs. Mitchell stated that she would provide members with
information regarding the rate for the library loan and indicate whether it was lower than projected.
Referring to the Contribution to Downtown Dover Partnership (DDP) (Line 31), Mrs. Mitchell
stated that the proposed budget for FY14 provided for a contribution in the estimated amount of the
BID tax at $49,500 and that the BID Tax would be $49,800.
Mrs. Mitchell explained that insurance rates were on the rise nationwide as a result of all of the
natural disasters and that the increase in the City’s insurance costs was attributed to that as well.
Page 7
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 7
In response to Mr. Slavin, Mrs. Mitchell stated that the increases in the General Pension Unfunded
Liability (Line 36) and Police Pension Unfunded Liability (Line 38) for FY13 came from the excess
carry forward balances and that this was not policy but based on a Council action. The FY14 budget
for these liabilities is based only on the actuarial analysis; however, following the FY13 audit, any
excess carry forward would be included in a budget revision.
Mrs. Mitchell advised members that the increase in the Transfer to Capital Fund - Projects (Line 45)
was the result of not deferring any of the projects for FY14 and fully funding the CIP.
Mrs. Mitchell stated that the Governmental Capital Projects Fund Summary on Page 5 of the
presentation showed the CIP financing sources. She informed members that the library project was
expected to be complete by June 30, 2013. She explained that the $2M Transfer from Future
Capacity Reserve (Line 12) for the Calpine project and the $2M Proposed Bond/Bank Proceeds -
Street (Line 4) would likely carry over into FY14 and that a budget revision to that effect would be
brought forward later in the year. She stated that the street project was going to be part of the library
bonding and that a $4.7M loan was authorized, with $1.2M to be paid back on the loan when the
library was sold. However, the loan was locked at $3.5M and the library used $2.7M, with the other
$800,000 going toward the street program. Rather than bond the differential and take out more debt
service for the street program, she and the City Manager proposed that the funds from the sale of
the library be used to pay for the street program when that project is ready to move forward, and the
loan would remain at $3.5M.
Mr. Koenig reviewed a presentation entitled “Budget Review: Fiscal Year 2013 - 2014” (beginning
on packet Page 180), which provided information regarding the budgets for each department in the
General Fund and detailed the 2.4% change between the FY13 budget and the FY14 proposed
budget indicated in the Expense Summary on Line 28, Page 4, of the “City of Dover FY 2014 Draft
Budget: Total Budget & Fund Summaries” presentation.
In response to Mrs. Williams, Mr. Koenig explained that the Administrative Expenditures are the
30 series line items in each budget and that the details for each line item were located under each
departmental section in the budget.
Mr. Koenig explained that a majority of the 10% increase for the Parks and Recreation budget was
related to the Capital Outlay for adding air conditioning to the Pitts Center as well as additional
planning and engineering associated with laying the ground work to convert the property donated
to the City by Stover Homes to playing fields in the future. In addition, he stated that, in previous
years, the Parks and Recreation budget typically included a donation for support to the Fourth of
July Committee; however, the Committee President, Mr. Gary Patterson, had indicated that the
City’s support would not be requested for FY14. Mr. Patterson had shared appreciation for the
City’s previous support and promised to notify the City should future support become necessary.
Referring to the proposed budget for the Police Department, Mr. Koenig stated that the 4% increase
in overall operating expenses was mostly due to employee-related expenses, including step
progression in FOP, contractual obligations for DOE, and changes to the non-bargaining positions.
Page 8
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 8
In response to Mr. Bonar, Chief Hosfelt indicated that the estimated total cost for a fully equipped
police car was $35,000 and that he would confirm the total cost for a fully equipped police
motorcycle and inform members.
Responding to Mr. Hare, Mr. Koenig stated that the gasoline budgeted for the Tax Assessor’s Office
was for the department’s vehicles and that the contractual services were for assessment software.
He explained that the vehicle was utilized by the residential technician to perform assessments for
construction-related activities and surveying conducted in the field for the purpose of assessment.
Mr. Koenig stated that staff could evaluate the vehicle policy in the future to determine whether it
would be cost efficient to reimburse for mileage and fuel rather than paying insurance on two (2)
vehicles.
Mr. Koenig informed members that the proposed budget for the Economic Development Office
included a $15,000 contribution to Kent County Tourism which was requested as the fee for
managing Old Dover Days for the City, and shared his opinion that this service was well worth the
fee.
In response to Mrs. Williams, Mr. Koenig explained that the 39% overall decrease proposed for the
Public Works - Facilities Management budget was due to several retirements and staff’s election to
convert one (1) of these positions to a contractual services agreement for cleaning and not to include
one (1) of the positions in the FY14 budget.
Without objection, the meeting recessed at 7:21 p.m. and reconvened at 7:31 p.m.
Water/Wastewater Fund
Mrs. Mitchell continued the review of the “City of Dover FY 2014 Draft Budget: Total Budget &
Fund Summaries” presentation with the Water/Wastewater Fund Summary on Page 6 and
highlighted that the revenues for Water Services, Wastewater Services, and Wastewater Treatment
Services (Lines 6-8) remained flat for FY14 with not much increase. As a result of a decrease in
usage, the amount for Wastewater Services and Wastewater Treatment Services was decreased
slightly.
Referring to the Debt Service for water and wastewater (Lines 26-27), Mrs. Mitchell indicated that
the revised FY13 budget as well as the FY14 budget amounts were decreased because some of the
projects planned for financing in FY13, particularly the Garrison Farm project, did not begin as
anticipated. She stated that the debt service for these projects was moved to the out-years and
expressed her hope that they would be completed within the next 12 to 18 months. She indicated
that staff was currently working on the bond issue.
In reference to Mr. Slavin’s earlier question regarding the carry forward balance, Mrs. Mitchell
explained that, similar to the General Fund, the Pension Unfunded Liability (Line 31) in the
Water/Wastewater Fund was increased in the revised FY13 budget to include the excess carry
forward amount. However, the amount budgeted for FY14 was based on the actuarial analysis.
Mrs. Mitchell explained that the amount of the transfer to the Water Improvement and Extension
Fund (Line 40) for water projects was decreased for FY14 because the forecast model projected a
negative cash flow amount.
Page 9
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 9
Mrs. Mitchell stated that the Water/Wastewater Fund was balanced with $747,600 in excess of the
8% minimum requirement but remained within the 12% maximum.
Mrs. Mitchell reviewed the Water/Wastewater Improvement & Extension Fund Summary on Page 6,
and highlighted that in regard to the Bond Proceeds (Lines 5-6) staff was currently “gearing up” the
bond issue and that the bonds were scheduled to sell on July 31, 2013, which will roll over into
FY14 and the project expenses (Lines 18-23) would also roll over into FY14 as carry forward
projects.
Mr. Koenig reviewed a presentation entitled “Water/Wastewater Fund Budget Review: Fiscal Year
2013 - 2014” (beginning on packet Page 271).
In response to Mrs. Williams, Mr. Koenig stated that the Impact Fees for the Water/Wastewater
Fund were listed on Lines 11-12 on Page 6 of the “City of Dover FY 2014 Draft Budget: Total
Budget & Fund Summaries” presentation, and that the amounts were down from previous years
because the impact fees are related to construction items for new houses or new commercial entities.
He noted that when the Calpine project comes online they will be required to pay impact fees and
anticipated that those fees would probably “hit the budget” in late FY15 or early FY16. He stated
that he thought that Calpine was capped at 100 Equivalent Dwelling Units (EDUs) and the current
rate was $2,100 for water and $1,900 for sewer, but indicated that he would provide members with
the total projection for the Calpine impact fees.
Electric Fund
Mrs. Mitchell continued the review of the “City of Dover FY 2014 Draft Budget: Total Budget &
Fund Summaries” presentation with the Electric Revenue Fund Summary on Page 8, noting that the
Purchase Power Adjustment (Line 4) showed a $9,428,700 reduction in revenue with the revised
electric rates, and the Direct Sales to Customer (Line 3) were projected to be $644,000 more than
the original FY13 budget but less than the revised FY13 budget due to a decline in consumption.
She stated that the Transfer from Rate Stabilization Reserve (Line 10) helped to balance this budget.
Referring to Other Expenses (Lines 37-52), Mrs. Mitchell highlighted the Contractual Services -
Requests for Proposals (RFPs), stating that the $190,000 budgeted for FY13 helped pay some of the
fees for the Utility Attorney, Mr. Kirk Betts, for renegotiating the NAES contract, as well as other
contracts, and paid for the GAI Study. She explained that the $100,000 budgeted for FY14 would
be used to pay Mr. Betts for contract negotiations, including concluding the NAES contract
renegotiation, as well as legal expenses incurred regarding the Ward Transformer Site and IBEW
contract negotiations.
In response to Mr. Bonar, Mrs. Mitchell confirmed that the Contractual Services - RFPs budget
accounts for the expenses the City has incurred for Mr. Betts that will be reimbursed by Calpine and
elaborated that the Electric Director also has legal expenses in the electric administration budget
which are used for legal fees for the review of bids or project contracts that require scrutiny.
Responding to Mr. Lynn’s inquiry in regard to performing a cost analysis on legal expenditures to
determine if it would be more cost effective to hire an in-house staff attorney to handle some of
these matters rather than outsourcing them, Mrs. Mitchell indicated that she and the City Manager
have discussed this possibility and that she could pull the numbers for legal costs from the ledger
Page 10
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 10
for a report to Council. She did express the opinion, and Mr. Lynn agreed, that with the specialized
nature of the services provided for the electric department by Mr. Betts, these legal services would
need to continue to be outsourced.
Referring to Mr. Slavin’s earlier question regarding the carry forward balance, Mrs. Mitchell
explained that, similar to the General and Water/Wastewater Funds, the Transfer to Pension
Unfunded Liability (Line 43) in the Electric Fund was increased from $1,074,200 to $7,274,200 in
the revised FY13 budget to include the excess carry forward amount from FY12. However, the
amount budgeted for FY14 was based on the actuarial analysis and any excess carry forward from
FY13 will be transferred to the Electric Rate Stabilization Reserve. She explained that the Pension
Unfunded Liability Fund is a trust that holds the assets for all the funds, so when the percentages
are calculated for the unfunded liability and the next transfer, the increase in those assets will help
all three (3) funds.
In reference to the Transfer to Worker’s Compensation (Line 49), she reminded members that there
was a large claim of approximately $1M and that, as a result, the City had to pay the $500,000
deductible, so she replenished the Worker’s Compensation Fund out of the Electric Fund since it
was an electric claim.
In regard to the transfers to the Electric Revenue Fund, Mrs. Mitchell stated that the $2.1M in the
revised FY13 Transfer to Future Capacity Reserve (Line 56) was to replenish what was transferred
to the General Fund for the infrastructure at the Garrison Tract and that the $12,400,000 transfer to
the Rate Stabilization Reserve in the revised FY13 reflects the amount staff projects for the FY13
savings to go back to the customers.
Mrs. Mitchell stated that the Electric Fund budget balance of $1,834,000 exceeds the minimum
requirement attributed this to her anticipation of a $5.4M transfer from the Rate Stabilization
Reserve prior to recently receiving the results of the rate study. However, only $4M came in from
the Rate Stabilization Reserve, so did not expect the additional $1.4M.
Mrs. Mitchell reviewed the Electric Improvement & Extension Fund Summary on Page 9 of the
presentation and stated that the $5,298,600 Transfer from Electric (Line 3) would fully fund all of
the projects for FY14. She also noted that the $440,000 for General Service Billing (Line 7) was
a change from prior practice, explaining that the City bills some customers for capital improvements
that are made to their services. In prior years that money went to the Operating Fund, but staff will
now be putting that money back into the Capital Fund to reimburse those project costs to help
support the projects.
Mr. Koenig reviewed a presentation entitled “Electric Fund Budget Review: Fiscal Year 2013-
2014” (beginning on packet Page 284).
In reference to the Electric T&D budget, Mr. Koenig explained that a lot of the increase in Capital
Outlay expenses was for new development and that this was good news in that when a lot of
development is occurring, the City pre-purchases electric, transformers, and wire to extend services
to the new customers and some of these costs are billed back to the customer, so there is revenue
associated with this. While portions of some of these projects are not reimbursed by the customer,
in general increased expenses associated with either new residential or commercial development are
Page 11
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 11
a good indicator that the economy is slowly improving and the City’s system is slowly expanding,
which would create additional revenues in the future.
PERSONNEL INFORMATION
Mr. Scott Koenig, City Manager, reviewed the “City of Dover Fiscal Year 2014 Proposed Budget
Personnel Table” located on Page 41 of the meeting packet, noting that although there were some
fluctuations in positions from moves within departments like Planning and Inspections and Public
Works, the total number of positions was down to 347 from 362 in FY12 and 350 in FY13. He
explained that a few new positions were added, including two (2) employees in the Police
Department, one (1) of which will be shared with Information Technology (IT), one (1) part-time
employee for Customer Service, and one (1) part-time employee for the Library. Further, he stated
that the goal was to become more efficient, that staff was looking at contracting out certain services,
where appropriate, yet not proposing radical changes to the workforce.
Mr. Koenig reviewed the “City of Dover Personnel Budget Fiscal Year 2014: Total City by Fund”
located on Page 42 of the meeting packet and noted that approximately $30M was budgeted for
employee salaries and benefits for a workforce of employees to provide the basic municipal services
that have been identified for next year’s budget.
Mr. Koenig explained that Page 43 of the packet provided an overview of personnel changes
proposed for FY14.
OVERTIME
Mr. Scott Koenig, City Manager, reviewed the “City of Dover Overtime Comparison Fiscal Year
2011 through 2014,” Pages 44-45 of the meeting packet. He explained that there was a push over
the last year to identify compensatory time and overtime costs and develop strategies to reduce these
costs while continuing to provide at least the same level of service. He stated his opinion that he
does not expect the City to get to a point where there is no overtime and that the questions become:
1) what is manageable overtime, and 2) at what point do the costs for overtime indicate that another
person should be hired, either on a full- or part-time basis, so that the City is not frivolously offering
overtime or wearing out the workforce. He noted that in places like the Library, it seemed
appropriate to use part-time help because there are a lot of individuals seeking part-time work and
the Library schedule is beyond a normal work week; however, part-time work does not work in
every division.
FINANCIAL FORECAST BY FUND
Mrs. Donna Mitchell, Controller/Treasurer stated that the financial forecasts were a work in progress
and conveyed her hope that, once the budget was adopted, she would be able to work further on the
forecasts to develop a financial plan for all three (3) funds addressing the long-term needs of the
City for Council to review at later date.
General Fund
Mrs. Mitchell reviewed a presentation entitled “City of Dover General Fund Financial Projections
2014 - 2018” (Exhibit #2), including Key Assumptions; Revenues, Expenditures, and Fund Balance;
the Funding Sources and Use of Funds for Capital Projects; Projected Debt Service; and Revenue
and Expenditure Trends.
Page 12
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 12
Mrs. Mitchell noted that there was one (1) fixed cost item in FY15 included for the $100,000 cost
of the reassessment consultant.
Referring to Page 3 of the presentation, Mrs. Mitchell highlighted that the growth increases in
revenues were minimum compared to the growth increases in expenses, especially for salaries and
wages, healthcare insurance, and retiree healthcare. She noted that the decrease in the lump sum
pension amount was a result of the allocation change. She stated that for the Other
Post-Employment Benefits (OPEB) amount, she included the 2% increase for the phase in plan.
Mrs. Mitchell indicated that the Fund Expense was for grant-related expenses, police pension
expenses, and the police grant which passes through the General Fund to the Police Pension Fund.
She explained that the Transfer to the CIP was an expense driver because she forecasted to fully
fund the transfer which fluctuates from year to year. She noted that the Surplus/(Deficit) indicated
that spending would increase each year over and above the revenues. In reference to the Additional
Funds Needed at the bottom of the page, she stated that there was a slight difference between her
estimated figures and the projection in this model as a result of the difference in rounding used in
the model.
In response to Mr. Slavin, Mrs. Mitchell confirmed that if Council adopts budgets that reflect the
forecasted numbers for the out-years, the City will develop a structural deficit of $7.5M in a short
time. She also stated that the expense numbers were very conservative, noting that she did not know
that the salaries and wages would come in at 2%.
Responding to Mrs. Williams, Mrs. Mitchell stated that the revenue from water for Calpine was not
included in this forecast which maintains the $500,000 transfer from the Water/Wastewater Fund.
The Calpine revenue was one of the items that she would like to revisit after the adoption of the
FY14 budget.
Mrs. Mitchell stated that the General Fund debt service was very low and in order to do any type of
building, infrastructure, or anything that would require debt, it would be necessary to increase taxes
or take other measures to cover that debt.
In regard to Revenue Trends, Mrs. Mitchell explained that some of the increases were related to rate
increases in previous years rather than growth increases. The forecast model does not “flush out”
one-time receivables, so some of the trends are not actual trends, for example the number for the
Grants Received was driven up by the State library grants for FY11, FY12, and FY13.
Mrs. Mitchell reminded members of the budget constraints in FY11 which were reflected in the
Transfer from the Electric Fund of $8.8M, which Council approved in excess of the policy limit to
help the General Fund. Additionally, the Water/Wastewater Fund Transfer was reduced for several
years and no funds were transferred in FY11 due to struggles with the infrastructure, water quality
projects, and the I & I issue, which resulted in the necessity to transfer more from the Electric Fund
to maintain a stable revenue in the General Fund.
In reference to the Electronic Red Light Safety Program (ERLSP), Mrs. Mitchell informed members
that these monies are included as transfers because they must remain segregated since State monies
cannot be co-mingled and must be transferred over from another fund. She stated that the
fluctuations in these transfers were associated with non-operational cameras which were now fixed.
Page 13
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 13
Mrs. Mitchell stated that the peak for the Realty Transfer Taxes was in FY08 at $3.5M and that the
projection for FY14 was $1.3M, which was a $2.2M swing.
Referring to the expenditure trends for salaries and wages, Mrs. Mitchell reiterated that her 2%
assumption for FY15 was very conservative compared to the percentages for FY08 and FY09. She
reminded members that the percentages below 2% in FY10 - FY13 were the result of furloughs and
no raises.
Mrs. Mitchell reviewed the Municast General Fund Statistics, 2003 - 2012 (Exhibit #3). She
reiterated that the model does not “flush out” one-time items, as exemplified by the 201.1% three
(3) year average for the Transfers from the Library Reserve to help build the library. She
highlighted the three (3) year averages as well as the historical (10-year) averages for several of the
“normal” revenue items that did not have those types of dips, including property taxes; licenses and
permits; and sanitation fees and rebates. She noted that the three (3) year average for sanitation fees
reflected the trash fee increases of the past few years.
Mrs. Mitchell also highlighted the averages for the salaries and wages, health insurance, retiree
healthcare, lump sum pension, and OPEB expenses, reminding members that the Governmental
Accounting Standards Board (GASB) was implemented in FY09, and explained these were items
which the City has not been able to control. She stated that these were costs that the City had been
absorbing and that the City will not be able to continue to do so.
Mrs. Williams suggested that years of overspending were reflected in the historical averages.
Responding, Mrs. Mitchell stated that there were other differences to take into account, such as the
currently lowered head count, and that the model used did not allow these adjustments to be made.
She noted that in the past the City had larger budgets than the current budget and carry forward
balances were used to help fund the next year’s budget; therefore, more funds were spent than were
brought in.
Water/Wastewater Fund
Mrs. Mitchell reviewed a presentation entitled “City of Dover Water and Wastewater Fund Financial
Projections 2014 - 2018” (Exhibit #4), including Key Assumptions; Net Margins for Combined
Water and Wastewater; Net Margins for Water; Net Margins for Wastewater, Improvement and
Extension Fund; Capital Improvement Plan; Water/Wastewater Fund Project Debt Service; and
Reserve Account Projections.
Mrs. Mitchell explained that wages and benefits were reflected at 3% because the Municast model
separates each General Fund ledger line item; however, for the Water/Wastewater and Electric
Funds it is just a division expense total; therefore, she used a division expense increase of 3% across
the board to cover all of the increases.
Mrs. Mitchell stated that the Net Margins for Combined Water and Wastewater was a Generally
Accepted Accounting Principles (GAAP) statement rather than a budgetary statement, which was
done on an accrual basis as opposed to a cash, budgetary-type basis, and was different from what
was included in the budget.
Page 14
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 14
Mrs. Mitchell explained the importance of reviewing: 1) margins available for debt service to
measure the debt ratio to ensure it covers the requirements of the bond covenant; 2) the cash from
operations, which is the amount available to transfer to the CIP Fund for projects to pay for the
principle on the debt since they do not run through the income statement; 3) the necessary reserve
transfers; and 4) the net positive/(negative) cash. She noted that the net cash was at $401,300 for
FY14; therefore, the transfer to the Improvement and Extension (I & E) Fund was reduced by
$500,000 for water. She stated that the out-years show negative cash balances; however, the debt
service ratio is covered. She explained that the debt service ratio was1.2% for this fund and that she
tries to keep it around 2%. Although it was higher for the out-years, the transfers were less, in an
attempt to obtain positive cash balances.
In reference to the negative cash balances projected for water in the out-years, Mrs. Mitchell
reiterated that the forecast does not yet include Calpine.
In response to Mr. Bonar, Mrs. Mitchell explained that the Water/Wastewater model was used to
develop the rates based on cost of service, just as for electric. She stated that she still needed to
calculate the adjusted rates to determine what rate increases would be necessary for the future;
however, she was waiting to include Calpine to ensure the numbers were “firmed up” before
bringing forward recommendations to Council.
Mrs. Mitchell reviewed the I & E Fund model which showed the source funds for the CIP projects
and noted that for FY17 and FY18 the transfers to this fund would have to be increased to cover the
level of the projects or the projects would need to be reduced. She explained that Ms. Sharon Duca,
Public Works Director, indicates what portions of the projects are growth related so that these
portions can be funded using the impact fee reserve.
In regard to the projected debt service for the Water/Wastewater Fund, Mrs. Mitchell advised
members that a lot of debt service was layered on to fund the Calpine projects. She noted that the
City finished a series of State revolving loans in FY09, FY10, and FY11 and that the final related
project was completed last week. She stated that staff was currently working on the bond issue for
Calpine and that the Series 2003 bonds would be refinanced at that time to take advantage of the
currently lower interest rates.
With regard to the reserve account projections, Mrs. Mitchell stated that most of amounts were
interest earnings and that some of the reserves were a little over the policy limit; however, at this
point, she had not pulled any of that information out. She noted the transfer from the Impact Fee
Reserve for water in the amount of $390,000 to fund a project in FY14. Likewise, she indicated that
the City would be transferring $1,315,600 from the wastewater Impact Fee Reserve in FY15 to fund
projects and additional funds would be transferred in the out-years as well.
Mrs. Mitchell reviewed the “Water/Wastewater Fund - Reconciliation” (Exhibit #5) and explained
that prior to providing members with the budget report, she reconciles both the Water/Wastewater
and Electric Fund forecast models against the budget to ensure that the information ties together.
She also noted that while the model combines the I & E and Operating Funds, the budget separates
them.
Page 15
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 15
Electric Fund - Results of Electric Cost of Service Study and Rate Analysis
Mrs. Mitchell reviewed a presentation entitled “City of Dover Electric Revenue Fund Financial
Projections, 2014 - 2018” (Exhibit #6), including Key Assumptions; Cost of Service Review -
Update to FY13 Rates; Power Supply Cost - FY12 and FY13; Net Margins; Projected Debt Service
Coverage; Projected Cash Flow Position; Cost of Service Summary by Class; Proposed Customer
Rates; Rate Stabilization Reserve; Projected Energy and Supply Requirements; Projected Purchased
Power Expense and History; Improvement and Extension Fund; Capital Investment Plan 2013 -
2017; Electric Fund Projected Debt Service; Reserve Accounts; and Net Generation Forecast.
Mrs. Mitchell explained that the cash from operations for the FY12 Actual and FY13 Revised
budgets showed a favorable swing of approximately $13.2M, which accounted for the $12.4M
transfer from the Electric Fund to the Rate Stabilization Reserve in FY14.
In reviewing the Net Margins, Mrs. Mitchell reminded members that the margins available for debt
service measure the debt ratio to ensure the requirements of the bond covenant are met and
explained that the rate consultant attempted to keep the net margins below $4M to “smooth out” the
transfers in from the reserve.
In reference to the projected cash flow position, Mrs. Mitchell stated that the model does not include
the beginning cash; therefore, the $13,472,600 negative cash flow indicated for the revised FY13
budget does not account for the $13.2M cash from operations which is currently in the bank account.
Mrs. Mitchell reviewed the Cost of Service Summary by Class, which detailed the average
percentage difference each customer could expect. She noted that there was an overall 11%
systemwide difference which makes up the $9.4M.
Mrs. Mitchell stated that the Rate Stabilization Reserve was forecasted to exceed the policy;
however, she reminded members that the consultant only projected through FY16 and wanted to
keep the numbers up until the City sees where the future market goes.
Responding to Mr. Slavin’s questions regarding where the proposed new large commercial and
residential rates would put the City in relation to other electric providers in Delaware, Mr. Koenig
indicated that the City’s current summertime residential rate was the third lowest in the State, behind
the Lewes Board of Public Works and the Delaware Electric Cooperative, and stated his belief that
the proposed rate reduction would possibly give the City the second lowest residential rate in the
State. In regard to the large commercial rate, he stated that the numbers are not easy to derive;
however, staff would conduct an analysis and provide members with an estimate.
Mrs. Mitchell reminded members that if Council so desired, more funds could be taken out of the
Rate Stabilization Reserve until the City was ready to implement another rate increase, and a PCA
adjustment and credit could be done, as in the past.
Mrs. Mitchell explained that she included the history as well as the projections for purchased power
expenses to illustrate the large drop in the power supply cost. She stated that between FY07 and
FY10 the rates went up as high as $89.97 per MWh but that the FY14 cost of $59.58 per MWh was
almost back to the FY06 level when the City was under the fixed price contract with Duke.
Page 16
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 16
In regard to the Capital Investment Plan, 2014 - 2017, Mrs. Mitchell stated that the highlighted rows
for the Units 1 and 2 projects indicate projected spending in FY18 but that these amounts were
moved out to FY18 pending a decision to either refurbish or mothball the units.
Mrs. Mitchell stated that the 2010 Series bonds will roll off at the end of FY16, causing a drop in
the debt service, which will coincide with the power supply for the PJM market, and this will be the
time to make a decision on Units 1 and 2 (when they are no longer bidding the market), to build
power generation, or finance something.
Referring to the Reserve Accounts, Mrs. Mitchell noted that they were projected to remain under
the $10M policy limit until FY18 and would go above the limit at that time if not used by then.
Electric Fund - Forecasted Net Generation Credit/Cost for the Electric Fund
Mrs. Mitchell reviewed Page 17 of the “City of Dover Electric Revenue Fund Financial Projections,
2014 - 2018” presentation, in regard to the Net Generation Forecast, which was prepared to answer
the question of whether the plant pays for itself and showed whether the City maintained a net credit
for maintaining the plant and funding the capital projects. She stated that the forecast projected a
credit of $4.8M for FY17 and $1.369M for FY18. She informed members that the PJM auction was
recently held and that the capacity credit came in about $80 per MW less than projected; therefore,
the capacity credit forecast for FY17 would decrease from $12,718,600 to $7,609,000 which would
result in a net expense. She stated that this may determine whether the City will be able to move
forward with the Units 1 and 2 projects budgeted for FY17 and FY18.
Mrs. Mitchell provided members with samples exhibiting the effect of the energy rate change for
10 major customer accounts (Exhibit #7). She noted that some of the changes were quite
significant, especially for those customers that had a demand effect.
REVIEW OF CAPITAL INVESTMENT PLAN (CIP)
Mr. Scott Koenig, City Manager, provided a summary overview of the Capital Investment Plan
(CIP) projects included in the draft budget (packet Page 84). He stated that many of the projects
were carried over from FY13 to the FY14 budget, so there was not much change other than slight
repositioning of a few projects. He informed members that all of the CIP projects were imported
into the forecast model to show how they will affect the financial forecasting.
In summary, Mr. Koenig stated that under the General Fund, there would be renewals and
replacements of vehicles, improvements to the John W. Pitts Center, and the contribution to the
Robbins Hose Company would be maintained. For water quality, funding was scheduled for line
replacement, emergency generators, and continuation with the removal of I & I, and he reminded
members of the previously discussed electric distribution system improvements. He stated that
there were also a number of police, water and sewer, and electric vehicles included in the FY14 CIP.
In response to Mr. Lynn, Mr. Koenig explained that a building assessment was performed on the
Dover Park Recreation Center by the City’s environmental contractor and that bringing it up to the
regular standards of an operating building would cost approximately $100,000 which, in staff’s
opinion, exceeds the value of the building. He stated that staff would bring forth a recommendation
to Council in July regarding this matter.
Page 17
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 17
Responding to Mr. Slavin, Mr. Koenig confirmed that no funds were budgeted in FY14 for the street
and alley program; however, he reminded members that $800,000 was pending expenditure in the
FY13 budget. Regarding the historical budget for the street and alley program, Mrs. Mitchell stated
that it was being funded at $350,000 per year and in FY13 budgeting was based on the previously
discussed $2M bond issue, so the $800,000 will be used from that loan and when the library is sold,
a portion will be used to make up the $1.2M difference. She explained that, due to staffing issues,
there is a backlog of projects, cash in the bank, as well as municipal street aid money earmarked for
capital projects that has not been spent for two (2) years; therefore, she and the City Manager
discussed changing the financing strategy. Mr. Koenig stated that the $1.3M contract for the street
program is set to “kick-off” at the end of FY13 and continue through FY14 using the $800,000 from
the loan, two (2) years of municipal street aid allocation for capital projects, and community
transportation funds.
In response to Mr. Hutchison, Mr. Koenig informed members that the State expressed interest in
renting the old library building; however, in his opinion, it was not currently up to modern standards,
so terms were not discussed. He stated that there have also been discussions with private investors
who may be interested in submitting proposals to purchase the library. He anticipated continuing
discussions with investors and bringing the matter forward to Council in the near future to determine
the best procedure for disposing of this excess property.
Responding to Mrs. Williams, Mr. Koenig reminded members that Council had authorized $6M for
the Garrison projects and design for several of the Garrison-related projects was being finished. As
bids for construction costs begin to come in, he would know what the fixed numbers would be.
However, if the numbers came back in excess of $6M, three (3) options could be explored: 1) scale
back the projects; 2) request infrastructure money from the State; and 3) request funding from
Calpine. He also stated that Calpine had expressed interest in the City negotiating a purchased
power agreement and it was his opinion that Calpine would be open to business-related negotiations.
Mr. Koenig stated that Calpine will be selling power and he felt that if the City presented an
agreement to meet Calpine’s bottom line, Calpine would probably negotiate whatever the City
wanted. However, he also confirmed that no potential agreements had been discussed with Calpine
to date.
QUESTIONS AND ANSWERS
In summary, Mr. Scott Koenig, City Manager, stated staff had put forward a balanced but very tight
budget with revenues of approximately $132.6M, and approximately $41,000 in the General Fund
and $747,600 in the Water/Wastewater Fund was not currently earmarked for spending. There
continued to be many needs in the Water/Wastewater Fund for I & I and water quality projects, and
the Electric Fund summary had $1.8M exceeding the requirements of the budget policies.
Mrs. Mitchell clarified that the policy specified a carry forward balance between 8% and 12%;
therefore, the Electric Fund was over the maximum by 1%. Mr. Koenig stated that the way the
spending plan was laid out, Capital Project and manpower needs were met, as well as all of the
requests that Council discussed during the Financial Retreat. He explained that the only caveat for
the budget to be considered balanced was for Council to embrace the idea of moving money from
FY13 to FY14, since the plan proposes the expenditure of more money from the General Fund than
will be raised in revenue during FY14. He reiterated his opinion that this was the prudent way to
move forward for this year of the budget.
Page 18
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 18
Mr. Slavin expressed concern regarding the assumption that the FY13 revenue projections will hold
true and the possibility of a shortage in the carry forward, especially with respect to the transfer tax.
In response, Mr. Koenig confirmed that there was risk involved with the proposed plan but he was
reasonably confident that the FY13 projections would be met since some of the other revenue
sources had met and/or exceeded the total revenue projected. He stated that staff shared his concern
and would continue to carefully monitor both the revenues and expenses for the remainder of FY13.
Mr. Hutchison stated that although the proposed budgeted contribution to the Downtown Dover
Partnership (DDP) was $49,500, the DDP had requested $210,000. He reminded members that over
the past few years the DDP had secured a $3M grant for the improvements to North Street and
Loockerman Way Plaza and was on the verge of an agreement with the State to rent a facility for
EZ Pass, which would provide a source of income. He strongly urged Council and staff to support
the DDP’s full request of $210,000, noting his opinion that it would be an outstanding investment
based upon what the DDP had done for the City of Dover and downtown.
Mr. Koenig confirmed that the proposed budget included the BID Tax of $49,500, but could not
confirm whether the $210,000 request was based on the debt service of the old loan.
Mr. Louis Colón, DDP Executive Director, stated that the budget that the DDP drafted, which was
the basis for the letter of support, included:
Insurance $ 30,000
Property Management $ 12,000
Telecom Mobile Phone $ 3,600
Dues and Subscriptions $ 2,000
Electric (including the Loockerman Way and North Street parking lots) $ 3,500
HVAC for real estate owned $ 400
Water, Sewer, and Trash for real estate owned $ 2,380
Training, Travel, and Meals $ 4,000
Consulting $ 3,000
Contracted Services $ 5,000
Committees that support the Main Street endeavor:
Organization $ 4,000
Marketing and Promotion $ 30,000
Economic Restructuring Committee $ 20,000
Design (provides funding for facade improvements) $ 30,000
Parking $ 10,000
Program and Materials (printing, supplies, and annual reports) $ 10,000
IT (Data Obsessions provides webpage) $ 560
PC and Software $ 3,000
Postage $ 250
Bank Fees $ 300
Supplies and Rentals $ 2,500
Office Rent $ 10,358
Debt Service for 22-24 Loockerman Street $ 39,650
(which would do the fit-out for the EZ Pass tenant)
Debt Service for the Acme Loan (principle and interest) $ 88,720
(budgeted in the event that the requested guarantee doesn’t come through)
Page 19
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 19
Millig/Kent County Community Action Agency improvements at Acme building $ 10,657
(DDP receives a rent payment but there is a also loan being paid back for
some improvements)
Salaries $110,000
($60,000 for Executive Director; $50,000 to continue the Administrative
Assistant beyond January 1, 2014 and for the Main Street Coordinator)
Payroll Taxes $ 7,700
Taxes for Properties $ 35,000
Total $478,575
He stated that with EZ Pass rent coming in and including all other parking lot rentals and rents that
are received on real estate, the budget was $478,000, total income was $316,000, with a deficit of
$162,360 with EZ Pass; however, if EZ Pass did not come in, the deficit would be $302,360.16. He
thanked Council for their support.
Mr. Slavin agreed with Mr. Hutchison’s comments and added that the Delaware Department of
Transportation (DelDOT) had announced an additional grant in the amount of $1M to extend the
North Street project another block; however, the City would have to match the funds. He stated that
it would not take much analysis to show a return on the investment for this kind of group acting on
the City’s behalf in this particular area.
Mr. Bonar stated that he had been involved with the DDP for several years, prior to his election to
Council and after, and that there were structural issues with the way that funds are budgeted and
spent. In many cases, the Board had counted on an item before it should have and that the issue of
spending money prior to actually receiving it needed to be addressed. He acknowledged that the
three (3) to four (4) month delay regarding EZ Pass had put the DDP in a bind and stated that he
supported the Partnership but not at a level of $210,000.
Mrs. Williams expressed her opinion that Council would need to make a choice between the
Economic Development Office (EDO) and the DDP because funding both would put the City in
jeopardy of overspending. She also felt that depending on reserves and carry-overs was bad fiscal
policy.
Mr. Bonar agreed with Mrs. Williams’ concerns regarding overspending; however, he noted that the
City’s EDO and the DDP were two (2) completely separate entities, with the partnership aimed
primarily at the downtown Dover area and the historic district. He felt that although the funding the
DDP derived from the State during the last several years has been “amazing,” as a result of
shortfalls, a cultural change needed to be made in the way the City and DDP related and that the City
needed to show fiscal restraint.
Mr. Hare questioned at what point the DDP would be able to function without City funding and
suggested the alternative possibility of loaning money to the organization. He relayed his concerns
regarding the amount of resources invested in economic development within the City of Dover
compared with other municipalities in Delaware.
Page 20
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 20
Mr. Slavin stated that the DDP was improving the downtown area. He felt that the concerns
regarding the overall function of economic development being split across two (2) entities were
important and should be discussed by Council, either as part of the budget process or separately.
He suggested that Council request the DDP to reexamine the operating costs and work with the City
to determine what amount could be supported. He stated that the DDP should address whether to
be a real estate flipping business or a rental agency, noting that without a subsidy from the City for
basic operations, the partnership would be forced into a rental operation. It was his opinion that it
was more beneficial for the City for the DDP to be in the business of buying, improving, and selling
properties in order to get them back on the tax rolls.
Mrs. Williams agreed with many of Mr. Slavin’s comments and reiterated her opinion that the City
was spending more on economic development than could be afforded and that Council needed to
make the unpleasant choice of whether to fund the City’s Economic Development Office or the DDP
in order to remain fiscal responsible to the taxpayers.
Mr. Hare expressed his frustration with the City funding the DDP to flip properties for profit without
having to pay any money back.
Mr. Hutchison recommended that the DDP President, Mr. Gregory Moore, be extended an invitation
to provide members of Council an update and the plan for FY14.
Mr. Lynn stated his disagreement with Mrs. Williams’ statement that the City had been
overspending for the past 10 years.
Mr. Lynn moved to increase the funding for the Downtown Dover Partnership (DDP) to $162,400,
including the BID Tax, seconded by Mr. Slavin.
Mr. Hare recommended that the DDP present Council with a five (5) year plan, expressing his
concern with the organization’s lack of accountability in the past.
On a call for the question, the motion to increase the funding for the Downtown Dover
Partnership (DDP) to $162,400, including the BID tax, carried by a roll call vote of five (5) yes
(Dixon, Lynn, Slavin, Hutchison, and Bonar), three (3) no (Perza, Williams, and Hare), and
one (1) absent (Anderson).
Mr. Koenig stated that staff would amend the budget to include the increased expense for the DDP.
In response to Mr. Hare, Mrs. Mitchell explained that the easiest solution for funding the increased
expense was to reduce the $166,000 transfer to the Capital Project Fund carry forward balance.
Responding to Mr. Bonar, Mrs. Mitchell stated that the DDP loan guarantee request, to be
considered by Council on June 10, 2013, would save the partnership approximately $31,000.
In response to Mr. Lynn, Mrs. Mitchell explained that the total amount for the 3% increases for
non-bargaining was $70,000 but that she did not have the amount for only the top 10 highest paid
employees in this category.
Page 21
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 21
In response to Mr. Slavin, Mr. Koenig stated that the budget includes a $15,000 payment to Kent
County Tourism for Dover Days and a payment to the African American Festival of $15,000.
Responding to Mr. Slavin’s question in regard to the deferred maintenance of infrastructure,
Mr. Koenig stated that the electric system was in the best shape, it had received a very good outside
rating for the valuation study, and the renewals and replacements are apparent. For wastewater, he
stated that there was an I & I replacement schedule as well as a lot of pump station work planned,
and that as long as the schedule identified in the capital plan was adhered to, progress would be
made on backlogged maintenance. In regard to the water system, he expressed his opinion that the
City had come a long way on the issue of water quality; however, the City would continue to spend
approximately$1M per year on pipe and $1M per year for I & I replacement. He indicated that the
largest gap not addressed in the long-term funding was the streets network. The assessment
completed approximately 10 years ago indicated spending roughly $1.5M per year to remain “ahead
of the curve” on the roads. He anticipated presenting an updated spending plan for the 15-20 year
replacements to Council within the next year. In the long run, he anticipated a cost of between
approximately $750,000 and $1M per year to catch up and maintain the level of service. As in years
past, the possibility of offsetting costs with Community Transportation Fund money is likely, since
there is still interest from legislators. Mr. Koenig stated that there was a long-term structural
problem in the General Fund which needs to be resolved, and adding a comprehensive street
program will exacerbate the problem. However, he explained that the road program was being
addressed in the correct way by allowing for pipe replacement first and then repaving the roads.
In response to Mr. Slavin, Mr. Koenig stated that the City’s Charter allowed for an assessment for
sidewalk and street repairs. He recalled a special sidewalk assessment program during the 1990s
which was administratively burdensome because it allowed property owners to chose between
replacing the sidewalk on their own or having the City do it and then charging an assessment. It
created animosity between the City and citizens and was wildly unpopular.
In response to Mr. Hutchison, Mr. Koenig stated that he would research and provide members
information regarding the City-wide travel budget, with specifics pertaining to out-of-state travel
expenses.
Mayor Carey expressed concern regarding ambulance service in the City of Dover and questioned
whether there was an increase in funding included in the FY14 budget. Responding, Mr. Koenig
explained that there was no proposed change to the ambulance contract but that he intended to meet
with the local volunteer companies for discussions. He did not think it frugal to add another shift
at $110,000 and that it would be more efficient to cooperate with other volunteer agencies and
ambulance services in the area. He felt that it may be necessary to expand the ambulance contract
in the long run, but staff did not think that point had been reached.
In response to Mr. Hare, Mr. Koenig stated that the City does not have rates in the ambulance
contract and was not at all involved in the billing.
Councilwoman Williams moved to recess and reconvene on Wednesday, June 5, 2013 at
6:00 p.m., seconded by Mr. Perza and unanimously carried.
Meeting recessed at 9:25 p.m.
Page 22
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 22
WEDNESDAY, JUNE 5, 2013 - 6:00 p.m.
The Special Council Meeting reconvened on Wednesday, June 5, 2013 at 6:03 p.m. with
Council President Bonar presiding. Council members present were Mr. Dixon, Mr. Lynn, Mr. Perza,
Mr. Hare, and Mr. Hutchison. Mr. Anderson, Mr. Slavin, and Mrs. Williams were absent.
Council staff members present were Mr. Koenig, Mrs. Mitchell, and Mrs. McDowell. Mayor Carey
was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved to adopt the agenda as presented, seconded by Mr. Dixon and unanimously
carried.
RESPONSES TO COUNCIL MEMBERS’ QUESTIONS AND INQUIRIES
Mr. Scott Koenig, City Manager, reviewed the list of “Dover Police Department FY14 Police
Vehicle, Equipment & Installation Costs” (Exhibit #8), noting the total costs for a patrol vehicle
($43,142), staff/CI vehicle ($24,500), and police motorcycle ($29,850). He also reviewed the “City
of Dover Donations Trend: Actual Donations from FY 2005 to 2012 and Budgeted FY 2013 &
2014” (Exhibit #9), indicating that for FY14, there were donations to the African American Festival
and Kent County Tourism in the amount of $15,000 each and no money was budgeted for the 4th
of July Celebration Committee.
Mr. Koenig reviewed the “City of Dover Budget Meeting - June 5, 2013 Analysis of Legal Fees”
(Exhibit #10), explained that the other legal fees were for costs associated with alley abandonments,
and reminded members that some negotiation and mediation costs were budgeted under labor
negotiations for FY10 and FY11.
Mr. Lynn suggested that staff begin the process of succession planning in preparation for the
eventually retirement of Mr. Nicholas Rodriguez, City Solicitor. He stated that although an in-house
staff attorney, paralegal, and research assistant budget would most likely exceed the current annual
for legal fees, staff would benefit by receiving more immediate answers and opinions.
Mr. Koenig stated that staff was not prepared to make a recommendation regarding the hiring of
in-house legal counsel versus contracting legal services for the FY14 budget but that they would
research this matter further in preparation for the FY15 budget. As recommended by Mr. Hutchison,
staff would also consult with Mr. Rodriguez, to obtain his valuable historic perspective and future
outlook on the City in regard to this matter.
Mr. Koenig reviewed an amendment to the FY 2014 Draft Capital Investment Plan (CIP) for an
Advanced Metering Infrastructure Project (EE1415) (Exhibit #11), stating that this electric capital
plan project in the amount of $150,000 would convert some of the City’s larger industrial customers
to more modern, electronic meter reading.
In response to Mr. Bonar, Mr. Koenig indicated that he not have an estimate of the cost to equip all
users with smart meters at this time; however, to implement this program, the City has to develop
the computer platform to convert the system, so this would be the starting point for implementing
the smart meter program. He stated that a general plan for the future would involve first upgrading
meters as they need replacing or when new meters are put into the system, followed by developing
a plan to upgrade the entire system, which would be a multi-year project.
Page 23
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 23
As requested by Mr. Hutchison during the Special Council Meeting - Budget Review of
May 29, 2013, Mr. Koenig reviewed the “City of Dover Budgeted Training/Conference/Food/Travel
Fiscal Year 2014 Draft Budget” (Exhibit #12), noting the total cost in the General Fund of $67,600,
the Water/Wastewater Fund of $13,300, and the Electric Revenue Fund of $65,700. He stated that
a majority of the cost in the Electric Revenue Fund was for Plant Management to meet the PJM
grade requirements. The training budgets allow staff to retain certifications and enhance skills. In
some cases directors budget for attendance of annual conferences, for example the International
Capital Market Association (ICMA) conference attended by the City Manager, or to permit some
of the support staff to attend a conference or training session.
Mr. Hutchison questioned the possibility of reducing the Training, Conference, Food, and Travel
budgets for City Council and the Mayor. Responding, Mayor Carey stated that he would be happy
to review the line items; however, he mentioned that he has paid for some of his City-related travel
expenses in prior years.
Mr. Hare noted the historical trends for these budgets and questioned the increase in costs.
In response to Mr. Lynn, Mr. Bonar confirmed that this budget did include morale building items,
such as birthday cakes for members of Council, and estimated that for him to attend the National
League of Cities (NLC) annual conference in Seattle, Washington in November would cost
approximately $1,100 to $1,200.
Mr. Lynn moved to amend the draft budget to reduce the City Council Training, Conference,
and Travel budget from $8,500 to $2,000, seconded by Mr. Hutchison, and carried by a
unanimous roll call vote (Anderson, Slavin, and Williams absent).
Mr. Lynn moved to amend the draft budget to reduce the Mayor Training, Conference, and Travel
budget from $6,000 to $3,000, seconded by Mr. Hare.
Mayor Carey requested clarification on the number of functions Council expected him to attend with
a budget of $3,000, noting that he belonged to the NLC Safety Advisory Committee but only
attended one (1) of two (2) NLC meetings in FY13, that he personally paid some of the cost to
attend the US Conference of Mayors and that the remainder was paid for by the host, and that he
serves as a representative of the Delaware League of Local Governments (DLLG). He stated that
he supports the decision of Council to save money; however, he does not want to receive criticism
for not attending functions.
Mr. Lynn moved to amend the motion to amend the draft budget to reduce the Mayor Training,
Conference, and Travel budget from $6,000 to $4,000, seconded by Mr. Hare.
Mr. Perza recommended that members be provided with a breakdown of the proposed plan for the
Mayor’s travel budget prior to making a final decision on this matter.
Mr. Koenig reminded members that the First Reading of the Budget Ordinance was scheduled for
the Regular Council Meeting of June 10, 2013. Mr. Bonar noted that a budget amendment could
be made during the First Reading of the Ordinance.
Page 24
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 24
Mr. Dixon stated the importance of the Mayor attending meetings on behalf of the City and that the
cost of each item needed to be determined prior to making a decision regarding reducing the budget.
Mr. Hare noted that many departments severely increased the training budget since last year and
expressed his opinion that staff should provide a report on what they learn after attending education
training, etc.
Mr. Hutchison stated that education and training was extremely critical for employees, especially
since there were new people in new positions.
In response to Mr. Hutchison, Mr. Koenig stated that travel requests are ultimately approved by the
City Manager and Controller/Treasurer and that he had made it clear to staff that he expects them
to follow through and utilize all of the funds budgeted for training, conference, food, and travel and
share the knowledge learned with the rest of staff upon return.
Mr. Bonar reminded members that there are hundreds of municipalities that have shared experiences
and each have unique ways of approaching similar situations, and that staff and Council can learn
a lot through attending training and conferences.
On a call for the question, the motion to amend the draft budget to reduce the Mayor Training,
Conference, and Travel budget from $6,000 to $4,000 was withdrawn.
Mr. Koenig stated that he and Mrs. Mitchell met with members of the Downtown Dover Partnership
(DDP) to discuss the Council action of May 29, 2013 to increase the funding for the DDP to
$162,400, including the BID Tax, and that both parties are going to make that amount work.
In response to the concerns expressed by Mayor Carey in regard to the ambulance service,
Mr. Koenig reviewed a presentation entitled “Ambulance Service for Robbins Hose Fire District”
(Exhibit #13), noting that staff had been working for several months on concerns related to the
provision of ambulance service in the City and the impact on some of the surrounding districts. He
stated that the presentation was prepared by Ms. Kay Dietz-Sass, Public Affairs Officer/Emergency
Management Coordinator, to identify the issues and describe the proposed plan for FY14.
Mr. Koenig noted the steady increase in service calls between 2002 and 2012 and stated that earlier
this year a gentleman from the Camden-Wyoming ambulance service advised him that the need to
respond to calls from within the City of Dover was impacting their ability to deliver service.
Mr. Koenig stated that the two (2) jurisdictions most affected by Dover calls were Camden and
Cheswold. He stated that it would cost an additional $100,000 to have a 24-hour ambulance service
and this would reduce the number of calls responded to by neighboring jurisdictions, but the analysis
revealed that it would not even reduce it by half because the service demand is constant for all
jurisdictions. Alternatively, staff proposed a donation of $8,125 to the Camden-Wyoming
ambulance service and $9,125 to Cheswold. These amounts were either specifically budgeted or
could be afforded in the portion of the City’s budget that is reserved for the ambulance contract.
Staff felt that this would be a prudent use of funds since volunteer services with limited funding
need donations in order to continue service. He noted that members of the services seemed very
appreciative of possible donations and would be willing to continue to deliver service until the
City’s needs exceed their ability to deliver service or the City’s contract is renegotiated in 2015. He
indicated that at the end of calendar year 2015, a review would be conducted to determine the City’s
Page 25
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 25
impact on local ambulance providers and a recommendation would be made in the next budget. He
stated that he received a favorable response from the Camden-Wyoming and Cheswold ambulance
providers but that final approval must be obtained from their respective Boards.
In response to Mr. Lynn, Mr. Koenig stated that the response times for neighboring ambulance
services within the City are within an acceptable range of the other jurisdictions because in most
cases they are responding from within the City due to being at the hospital or en route to or from.
There were no complaints from citizens regarding response times, the concern was the impact on
the other jurisdictions.
Responding to Mr. Dixon, Mr. Koenig stated that each ambulance service sets their own run rates
and determines the amount billed to the insurance company or patient but that the rates are not
stipulated in the City’s ambulance contract.
In response to Mr. Hare, Mr. Koenig confirmed that the City incurs a charge for the second
ambulance and that the first ambulance was not necessarily free but was in the baseline contract.
The ambulance service providers bill the patient/insurance company for each run.
Mr. Hutchison thanked the Mr. Koenig and Ms. Dietz-Sass for the time and effort put forth to
examine this issue.
Responding to Mr. Lynn, Mr. Koenig stated that all of the ambulance providers make money but
that it would be a very expensive endeavor to get into, with startup costs in excess of $1M plus staff.
Although he would not object to exploring the possibility in the future, he expressed his opinion that
the current services the City provides through the contractor and the surrounding municipalities were
reasonable.
Mr. Lynn moved to request the Safety Advisory and Transportation Committee to complete
an in-depth analysis to determine the feasibility for the City to have an ambulance corps to
service the needs of the City, to include the startup costs, the pros and cons, and whether it
could generate any revenue, seconded by Mr. Dixon, and carried by a roll call vote of five (5)
yes (Dixon, Lynn, Hare, Hutchison, and Bonar), one (1) no (Perza) and three (3) absent
(Anderson, Slavin, and Williams).
Mr. Lynn moved to approve the FY14 budgeted contributions to neighboring ambulance providers,
seconded by Mr. Hare.
Mayor Carey stated that the response times for ambulance services are governed by State law and
expressed concern regarding the impact on the City as well as the citizens if response times do not
meet requirements.
Mr. Perza questioned the need for the motion since this item was already included in the budget, and
the motion was withdrawn.
REVISED FINANCIAL FORECAST
Mrs. Donna Mitchell, Controller/Treasurer, reviewed a presentation entitled “General Fund Budget
& Forecast, Water/Wastewater Fund Budget & Forecast dated June 5, 2013" (Exhibit #14).
Page 26
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 26
Property Tax Increase
In regard to the General Fund, she explained that scenario options, including the contribution to the
DDP and tax increases, were added to the Municast Model base scenario as presented on
May 29, 2013. Then two (2) scenarios were run with different options selected to determine the
impact each would have on revenues and expenditures as well as the unreserved fund balance.
Responding to Mr. Lynn, Mrs. Mitchell stated that the Municast Model does not take inflation into
account, it only accounts for the growth rates that she inputs, such as those for salary increases and
property taxes.
Mr. Lynn thanked Mrs. Mitchell for the time and effort she expended in putting this model together.
He also expressed his opinion that Council cannot pass on $5M to $7M deficits and that they must
be proactive now to preclude the deficits in the future.
In response to Mr. Hutchison, Mrs. Mitchell confirmed that the proposed $0.03 tax increase would
balance the budget each year and stated that the funds could be used to increase the street program,
which would be new projects that were not previously budgeted.
Mr. Bonar expressed his support for a $0.03 tax increase to prevent a $7M budget deficit and stated
that this would not be a new revenue to fund pay increases.
Mrs. Mitchell reviewed the “City of Dover Sample Customer Analysis of $.03 Tax Increase &
Electric Rate Decrease” (Exhibit #15), which provided samples of how much the electric energy rate
decrease would save the customer and what the property tax increase would cost the customer.
Mr. Koenig explained that the infrastructure issue was a national problem and that the American
Society of Civil Engineers’ National Report Card for infrastructure is poor. He stated that failing
to repair the infrastructure would lead to catastrophic failures which, in the end, would cost more
money than a capital maintenance plan. When examining the budget, staff first looks at reductions
in operating costs, then cutbacks on vehicles, and lastly the street programs and other projects.
Although it is difficult to request a tax increase, it is visually beneficial because citizens are able to
see that their money is going to the renewal of vehicles and improvements in the streets. Staff has
indicated for years that there was a structural problem in the General Fund that can be addressed
through the development of new revenue sources or enhancement of current revenue sources and
an increase in the property tax can affect the budget quickly, since $0.01 would raise approximately
$316,000.
Referring to the residential samples on the “City of Dover Sample Customer Analysis of $.03 Tax
Increase & Electric Rate Decrease,” Mr. Koenig stated that with a $0.03 tax increase, the average
customer would experience an annual increase between $16 and $96 while simultaneously
experiencing a corresponding reduction in their energy costs, equating to a net reduction of costs
for each customer.
Mr. Lynn noted that property owners would be able to write off the property tax increase on their
income taxes which they could not do if the City were to raise electric rates.
Responding to Mr. Hutchison, Mrs. Mitchell stated that the last increase in property taxes occurred
in 2011 when, following the reassessment, the rate was not rolled back.
Page 27
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 27
In response to Mr. Hare, Mrs. Mitchell indicated that trash fees were raised in FY13.
Calpine Revenues
Referring to the “General Fund Budget & Forecast, Water/Wastewater Fund Budget & Forecast”
presentation, Mrs. Mitchell reviewed the Water/Wastewater Fund. She indicated that, as presented,
the model showed the water and wastewater separated and only represented the increases in
revenues, but that the expenses would be added in. She attributed the difference between the
projected water fees for FY15 and FY16 to the Calpine project. She reminded members that she
projected an increase in the transfer to the General Fund in FY16 to $500,000 but that the Fund was
still in pretty good shape at that point. She stated that, in regard to the wastewater side, most of the
revenues would probably be offset by expenses, predicting that the Kent County treatment fees
would increase. For FY16, she projected an 8% rate increase but also increased the transfer to the
General Fund to $500,000 and maintained a positive net cash amount. The 8% increase would
equate to $0.21 per thousand gallons for in-City customers and $0.32 per thousand gallons for
out-of-city customers, so the average customer using 5,000 gallons would experience an increase
of $1.05 per month in their bill for in-city and $1.60 per month for out-of-city.
In response to Mr. Hare, Mrs. Mitchell stated that according to the current forecast model, it would
be necessary to increase taxes in FY14, FY15 and FY17 to get the City through the next five (5)
years, unless Council wanted to consider discontinuing some services. Expenses were deferred in
the prior years and it was now affecting the citizens and the health of the City.
Mr. Lynn stated that the problem was that the City had kept tax rates artificially low by consistently
deferring necessary infrastructure improvements. He suggested other alternatives that may not be
very palatable, including getting rid of services or laying off employees and privatizing services.
Mr. Hare commented that the problem began in the 1970s and 1980s when the City began “living
off” the revenue from the power plants and tax rates were kept low; however, now the State wants
to ensure lower electric rates. He suggested that the City needed to determine why money is being
lost every year. Responding, Mr. Hutchison reminded members that the revenue losses were related
to the decline in economic development, particularly in the construction industry.
Mr. Bonar expressed that the main goal of the City was to provide services, that the cost to provide
services continues to increase, and the City must adjust by increasing property taxes because electric
rates cannot continue to increase. It was his opinion that it was most sensible to increase property
taxes, which the property owner could write off, and provide a corresponding or greater reduction
in the electricity rate.
In addressing the concerns raised by Mr. Hare, Mr. Koenig stated that the financial forecast is a
static, five (5) year snapshot that signals that staff and Council cannot be complacent and must find
ways to better manage the utilities, develop new techniques to manage money, find new revenue
sources, and reduce expenses to improve the forecast. It was his hope that the forecast would
improve, understanding that no one wants to recommend tax and rate increases year after year;
however, there are baseline costs that must be incurred to keep the infrastructure up. The five (5)
year model must be continuously analyzed as issues change.
Page 28
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 28
Mr. Hare and Mr. Bonar stated that there was funding available at the State level and expressed the
importance of coordinating with the legislative contingent in Dover to ensure answers are obtained
in a timely fashion so that the City does not miss any opportunities for funding.
Meeting recessed at 7:30 p.m. and reconvened at 7:47 p.m.
QUESTIONS, ANSWERS, AND OPEN DISCUSSION
Responding to Mr. Hutchison, Mr. Koenig stated that there are three (3) part-time and 36 full-time
non-bargaining positions and the total cost of providing a 3% salary increase for all of these
positions would be $72,800. In the past year, adjustments were made related to the Interim
Managerial Plan for four (4) positions: Water/Wastewater Maintenance Supervisor, Financial
Reporting and Accounting Manager, Director of Planning & Community Development, and
Information Technology Director. There were also four (4) people who were promoted internally,
as well as one (1) non-bargaining employee that was hired within the current budget year.
Mr. Koenig stated that during the discussions in regard to the adjustments for the four (4) previously
mentioned positions, he spent a lot of time examining where they were relative to their peers within
the City, their experience, and the duties they took on, and three (3) of the four (4) adjustments were
related to additional duties that the staff members took on as a result of other positions being cut
from the budget. There was a large cut in the budget in staff and benefits which basically paid for
the adjustments that were proposed earlier this year.
Mr. Koenig explained that it was his job, as the City Manager, to advocate for this group of
employees who were not otherwise represented and reaffirmed his position that the group as a whole
was deserving of the 3% proposal without fracturing off the four (4) positions that were previously
granted a raise or the employees who were promoted earlier this year. He assured members that he
understood that they do not want multiple raises in a year because it creates consternation and would
not be back for mid-year adjustments. He stated his belief that the 3% across the board was the right
thing to do, and that if he were paying out of his pocket his recommendation would still be to
provide the 3% increase to the entire group.
Mr. Hutchison expressed his respect for Mr. Koenig’s comments and stated that he would support
the 3% increase for the non-bargaining employees except for anyone who received an increase or
bonus this year.
Mr. Perza questioned if Mr. Hutchison would support the 3% increase for all non-bargaining
employees if it were based on the July 1, 2012 base salaries. Responding, Mr. Hutchison stated that
he thought it only fair to defer increases for those individuals who received an increase or bonus this
year until July of next year.
In response to Mr. Hare, Mr. Koenig stated that, in hindsight, the compensation for these employees
should have been adjusted beginning the day that they took on additional duties but that was not in
his realm of authorization as the City Manager. In some instances, he would have come before
Council in July 2012 if he had made requests when the additional duties were first assigned.
Mr. Koenig took full responsibility for the poor timing of the requests and reiterated that these
employees performed additional duties for months without compensation and, unfortunately, the
requests were brought forward for consideration only a few months ago, otherwise, this would not
be a matter for discussion at this time.
Page 29
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 29
In response to Mr. Lynn, Mr. Koenig stated that he strongly advocated for the 3% increase for all
non-bargaining employees across the board; however, if he were given no other option, he could live
with a 3% increase for all non-bargaining employees, based on the July 1, 2012 base salaries, as
proposed by Mr. Perza.
Mr. Hutchison moved to amend the draft budget to exclude those employees whose salaries were
adjusted for any reason, during FY13, from the 3% increase for non-bargaining employees,
seconded by Mr. Hare.
In response to Mr. Perza, Mr. Koenig clarified that the 3% increase would be based on the base
salary level, therefore, no bonus amount would be considered in the increase.
Responding to Mr. Hare, Mr. Koenig confirmed that the bonuses will stop in FY14 but would
continue until the Electric Director position and a position in the Public Works Department were
filled.
On a call for the question, the motion to exclude those employees whose salaries were adjusted for
any reason during FY13 from the 3% increase for non-bargaining employees failed by a roll call
vote of four (4) yes (Dixon, Hare, Hutchison, and Bonar), two (2) no (Lynn and Perza) and three (3)
absent (Anderson, Slavin, and Williams) for lack of a majority vote of members.
Mr. Lynn moved to amend the draft budget to stipulate that the 3% increase for non-bargaining
employees be based on the base salary levels as of July 1, 2012, seconded by Mr. Hare.
In response to Mr. Hare, Mr. Koenig confirmed that the non-bargaining employees had not received
a pay raise for two (2) years; therefore, the salaries for July 1, 2012 and July 1, 2011 were the same.
On a call for the question, the motion to amend the draft budget to stipulate that the 3%
increase for non-bargaining employees be based on the base salary levels as of July 1, 2012 was
carried by a unanimous roll call vote (Anderson, Slavin, and Williams absent).
Responding to Mr. Hutchison, Mr. Koenig stated that the Police Chief withdrew his request for the
hiring of an Accreditation Manager from consideration in the FY14 budget. James Hosfelt, Police
Chief, stated that he asked the City Manager to consider the future possibility of hiring retired police
officers as civilian employees to fill the two (2) sex offender and one (1) accreditation positions,
which would allow for the use of the officer positions in other duties; the total number of uniformed
officers would not decrease. Staff has requested the Deputy City Solicitor, William Pepper, to
provide an opinion as to whether the City would be able to hire retired City of Dover Police Officers
to fill civilian positions. Mr. Koenig stated that the Chief’s original position request was prioritized
for a LAN Analyst, Communications Operator, Accreditation Manager, and Officers for the Sex
Offender Unit and that the proposed FY14 budget included a LAN Analyst position to be shared
with the IT Department, as well as six (6) month funding for a Communications Operator, to
increase the 911 Communications Center staff from 11 to 12.
Mr. Lynn questioned the viability of this option in light of the previous opinion regarding the Crime
Analyst position and potential violations of IRS regulations. Concurring with Mr. Hare, Mr. Lynn
stated that hiring these retired officers as independent contractors could be an alternative approach
to avoid problems with IRS regulations.
Page 30
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 30
Mr. Lynn moved to amend the draft budget to include a $0.03 tax increase, seconded by Mr. Dixon.
By a roll call vote of four (4) yes (Dixon, Lynn, Hutchison, and Bonar), two (2) no (Perza and Hare)
and three (3) absent (Anderson, Slavin, and Williams), the motion failed for lack of a majority vote
of members.
In response to Mr. Lynn, Mrs. Mitchell explained that not enacting a $0.03 tax increase for FY14
would result in non-compliance with the City policies for revenues to meet or exceed expenditures,
and to maintain an 8% carry forward budget balance. She stated that for the out-years, the projected
Calpine revenue of $70,000 would not have much effect on the multi-million dollar deficits
projected for the General Fund. In order to address these issues without being proactive now,
Council would need to make revenue or program adjustments.
Mr. Perza suggested that members take time to explore the options related to a mixture of tax
increases and spending adjustments and not react immediately to five (5) year projections.
Mr. Lynn expressed his opinion that deferring the issue would only cause it to become exponentially
more expensive to address.
In response to Mr. Perza and Mr. Hare, Mrs. Mitchell stated that the projections for the out-years
are only “snapshots” and that the amounts could change; however, for FY14 there was a problem
and the savings from FY13 had to be carried forward in order to balance the budget without
proposing a tax increase.
Responding to Mr. Lynn, Mr. Koenig stated that to address the gap in the FY14 budget would
require only a $0.02 tax increase. Throughout FY13, staff signaled to Council that a tax increase
would likely be necessary and the proposed carry forward of $621,000 from FY13 only became an
option due to savings realized by not having a full level of employment. Although staff was
recruiting and filling positions throughout the year, the savings were the result of employees leaving
their positions at the City for various reasons, including retirements. Looking at the out-years,
OPEB liability funding will increase, Delaware Solid Waste Authority fees will increase every year
under the current contract, and the Police Department has legitimate requests for staff increases
which will increase the budget. The Police Department budget of $12M is a big driver of the overall
General Fund budget of $35M. Staff contracted the budget as much as possible, so there will be no
way to further cut away a $7M, five (5) year shortfall without reducing services, and he has received
the impression that Council desires to reduce service. Staff did everything possible to present a
balanced budget, but to accept it, policies must be disregarded for convenience. If Council approves
a tax increase, the $621,000 carry forward would go toward the staggering unfunded liability of
more than $80M.
Mr. Hare suggested the possibility of a $0.005 tax increase to cover the FY14 funding for the DDP.
Mr. Hutchison expressed his concerns that raising taxes $0.03 for the next three (3) years would only
balance the budget but the City would not be making money. Although he supported the employees,
union representatives and the employees must begin to understand that the City cannot continue to
give more every year. There are real concerns and staff and Council need to discuss ways to reduce
spending.
Page 31
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 31
In response to Mr. Perza’s comments, Mr. Koenig stated that a tax increase could not legally be
earmarked for a specific project but reminded members that a $0.03 tax increase, approximately
$1M, would create a revenue stream to fund the Capital Plan, because it is typically the last item that
receives budget consideration. Since Council has not been in favor of making staff cuts, the Capital
Plan budget has been cut, so additional funds raised would essentially go toward funding these
projects.
Mr. Bonar stated that, historically, Council was loath to increase taxes and chose instead to rely on
the electric utility to balance the budget each year. This trend cannot continue and officials at the
State believe the City’s utility rates are a barrier to economic development; therefore, unless new
revenues are developed, Council will need to set realistic tax rates.
Mr. Lynn moved to amend the draft budget to include a $0.025 tax increase, seconded by
Mr. Hutchison. By a roll call vote of four (4) yes (Dixon, Lynn, Hutchison, and Bonar), two (2) no
(Perza and Hare) and three (3) absent (Anderson, Slavin, and Williams) the motion failed for lack
of a majority vote of members.
Mr. Lynn moved for adjournment, seconded by Mr. Hutchison. By a roll call vote of two (2) yes
(Lynn and Hutchison), four (4) no (Dixon, Perza, Hare, and Bonar) and three (3) absent (Anderson,
Slavin, and Williams) the motion failed for lack of a majority vote of members.
Mr. Hare moved to amend the draft budget to include a $0.005 tax increase. The motion failed for
lack of a second.
Responding to Mr. Perza, Mr. Koenig proposed “Plan C” as a $0.02 tax increase and a transfer from
the Electric Fund to cover the differential for funding the DDP.
Mr. Lynn moved to amend the draft budget to include a $0.02 tax increase and a transfer from the
Electric Fund to cover the differential for funding the DDP, as proposed by staff, seconded by
Mr. Dixon. By a roll call vote of three (3) yes (Dixon, Lynn, and Bonar), three (3) no (Perza, Hare,
and Hutchison) and three (3) absent (Anderson, Slavin, and Williams) the motion failed for lack of
a majority vote of members.
Mr. Hare moved for adoption of the draft budget, as presented by staff and amended by
Council, with a First Reading to be held on June 10, 2013 and a Final Reading on
June 24, 2013, seconded by Mr. Dixon and carried by a roll call vote of five (5) yes (Dixon,
Perza, Hare, Hutchison, and Bonar), one (1) no (Lynn), and three (3) absent (Anderson, Slavin,
and Williams).
Mr. Hutchison moved for adjournment, seconded by Mr. Dixon and unanimously carried.
Meeting adjourned at 9:00 p.m.
TRACI A. McDOWELL
CITY CLERK
Page 32
SPECIAL COUNCIL MEETING (BUDGET REVIEW)
MAY 29, AND JUNE 5, 2013 PAGE 32
All orders, ordinances, and resolutions adopted by City Council during their Special Meeting of
May 29, and June 5, 2013, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM
S:\AGENDAS-MINUTES-PACKETS\Council-Minutes\2013\05-29-2013 and 06-05-2013 BUDGET REVIEW.wpd
Exhibits
Exhibit #1 - Presentation - City of Dover FY 2014 Draft Budget: Total Budget & Fund Summaries
Exhibit #2 - Presentation - City of Dover General Fund Financial Projections 2014 - 2018
Exhibit #3 - Municast General Fund Statistics, 2003 - 2012
Exhibit #4 - Presentation - City of Dover Water and Wastewater Fund Financial Projections 2014 - 2018
Exhibit #5 - Water/Wastewater Fund - Reconciliation
Exhibit #6 - Presentation - City of Dover Electric Revenue Fund Financial Projections 2014 - 2018
Exhibit #7 - Energy Rate Change Customer Samples
Exhibit #8 - Dover Police Department FY14 Police Vehicle, Equipment & Installation Costs
Exhibit #9 - City of Dover Donations Trend: Actual Donations from FY 2005 to 2012 and Budgeted FY 2013 & 2014
Exhibit #10 - City of Dover Budget Meeting - June 5, 2013 Analysis of Legal Fees
Exhibit #11 - Amendment to the FY 2014 Draft Capital Investment Plan (CIP) - Advanced Metering Infrastructure
Project (EE1415)
Exhibit #12 - City of Dover Budgeted Training/Conference/Food/Travel Fiscal Year 2014 Draft Budget
Exhibit #13 - Ambulance Service for Robbins Hose Fire District
Exhibit #14 - General Fund Budget & Forecast, Water/Wastewater Fund Budget & Forecast, dated June 5, 2013
Exhibit #15 - City of Dover Sample Customer Analysis of $.03 Tax Increase & Electric Rate Decrease
Page 33
EXHIBIT #1
2013 Budget Review
Special Council Meeting of 05/29/13
City of Dover
FY 2014 Draft Budget
Total Budget
&
Fund Summaries
Page 42
EXHIBIT #2
2013 Budget Review
Special Council Meeting of 05/29/13
City of Dover
General Fund
Financial Projections
2014 – 2018
Budget Meetings
May 2013 EXHIBIT #2
2013 Budget Review
Special Council Meeting of 05/29/13
Page 43
2
Key Assumptions
• The FY15 – FY18 Forecast continues to be short on revenues to cover projected expenses incorporating the growth
assumptions as below.
• Projected Revenues - Growth assumptions
Property taxes – 1.0%
Transfer taxes – 1.0%
Licenses & Permits – 1.0%
Sanitation revenues – 0.5%
Fines & Police Revenue – 1.0%
Library Revenue – 0.5%
Miscellaneous Revenue – 2.0% (includes Franchise fees, rental income, & recreation revenues)
Internal Service Fees – 2.0%
• Projected Operating Expenses reported at same level as FY13 with the following exceptions:
Pay increases included for non-bargaining employees, FOP progression, and DOE bonuses
Growth in Division expenses 2014 – 2108
Increased wages & benefits – 2.0%
General increases in materials and supplies – 1.0%
General increases in administrative expenses – 1.0%
Increased retiree health insurance premiums 5.7%
Increased OPEB normal cost with continuation of phase-in plan 2.0%
Pension contribution for unfunded liability as per previous actuary analysis
• Maintains Water/Wastewater & Electric Fund Transfers throughout the forecast
• Fully funds Capital projects through operating transfers, grants and use of reserves
Page 44
3
Revenues, Expenditures & Fund Balance
Page 45
4
Capital Projects - Funding Sources
Page 46
5
Capital Projects – Use of Funds
Page 47
6
General Fund Projected Debt Service
Page 49
8
Expenditure Trends
Page 50
EXHIBIT #3
2013 Budget Review
General Fund Statistics
Special Council Meeting of 05/29/13
2003 - 2012
Page 51
EXHIBIT #4
2013 Budget Review
Special Council Meeting of 05/29/13
City of Dover
Water and Wastewater Fund
Financial Projections
2014 – 2018
Budget Meetings
EXHIBIT #4
May 2013
2013 Budget Review
Special Council Meeting of 05/29/13
Page 52
2
Key Assumptions
• The model has no estimated growth or revenues and expenses related to the Calpine project. We expect to have
these numbers developed for the FY15 – FY19 Forecast. Preliminary indications are that we would see significant
growth. In the following presentation it will be noted that starting in FY15 we are projected negative cash
balances and yet no recommended rate increases. Once the Calpine numbers have been developed we will have a
better idea of potential rate adjustments.
• T/Gallons Growth
▫ Less than 1.0%
• Projected Operating Expenses reported at same level as FY13 with the following exceptions:
Pay increases included for non-bargaining employees and DOE bonuses
Growth in Division expenses 2014 – 2108
General increases in materials and supplies – 3.0%
Increased wages & benefits – 3.0%
Increased retiree health insurance premiums 6.0%
Increased OPEB normal cost with continuation of phase-in plan 1.6%
Pension contribution for unfunded liability as per previous actuary analysis
• County Treatment Fee Expenses projections kept level with previous year and forecasted growth
• Continues the groundwater inflow surcharge to cover cost of increases in treatment fees and ongoing capital
projects to reduce the inflow/infiltration
• Maintains $500,000 General Fund Transfer throughout the forecast
• Maintains transfers to Capital Project Fund each year for water quality and inflow/infiltration projects
• Continues prior level of capital improvements to replace failing infrastructure
• County Treatment Fee Expenses projections kept level with previous year and forecasted growth
• Impact Fees are projected to be used to pay debt service and project financing
Page 53
3
Net Margins – Combined Water & Wastewater
Page 54
4
Net Margins - Water
Page 55
5
Net Margins - Wastewater
Page 56
6
Improvement & Extension Fund
Page 57
7
Capital Improvement Plan
Page 58
8
Water/Wastewater Fund Projected Debt Service
Page 59
9
Reserve Account Projections
Page 60
EXHIBIT #5
2013 Budget Review
Special Council Meeting of 05/29/13
Water/Wastewater Fund - Reconciliation
EXHIBIT #5
2013 Budget Review
Special Council Meeting of 05/29/13
Page 61
EXHIBIT #6
2013 Budget Review
Special Council Meeting of 05/29/13
City of Dover
Electric Revenue Fund
Financial Projections
2014 – 2018
Budget Meetings
EXHIBIT #6
May 2013
2013 Budget Review
Special Council Meeting of 05/29/13
Page 62
2
Key Assumptions
• kWh demand for FY14 – FY18 less than 1.0% growth
• Interest rates 1.70%
• Maintains $8.0 million General Fund Transfer throughout the forecast
• Forecasted Operating Expenses reported at FY13 level with the
following exceptions:
Currently no pay increases for 2014, except non-bargaining &
progression steps
Growth in Division expenses 2014 – 2018
General increases in materials and supplies – 3.0%
Increased retiree health insurance premiums 6.0%
Fully funding OPEB liability
Pension contribution for unfunded liability as per previous actuary analysis
• No new debt issuance
• Compliant with debt covenants after adjusting for use of Rate
Stabilization Reserve
• Increase annual appropriation to I & E Fund for CIP
• Use of developer contributions to partially fund CIP (previously in the
operating fund)
Page 63
3
Cost of Service Review - Update to FY13 Rates
• Recognizing the continued decrease in our power supply, staff
requested Burns & McDonnell to update the rate model to revise
FY13 rates as well as to incorporate the revised forecast.
• While the financial model includes a five year forecast the City staff
requested the consultant to only provide rates adjustments through
FY16 in correlation with the PJM market.
• Any further changes in power supply cost will be adjusted through
the Power Cost Adjustment through FY16.
• A demonstration of the reason for having the rates revised two
consecutive years is provided on the next page.
Page 64
4
Power Supply Cost – FY12 & FY13
Page 66
6
Projected Debt Service Coverage
Project Cash Flow Position
Page 67
7
Cost of Service Summary by Class
Page 68
8
Proposed Customer Rates
Page 69
9
Rate Stabilization Reserve
Page 70
10
Projected Energy & Supply Requirements
Page 71
11
Projected Purchased Power Expense (& History)
Page 72
12
Improvement & Extension Fund
Page 73
13
Capital Investment Plan 2013 – 2017
Page 74
14
Capital Investment Plan 2013 – 2017 continued
Page 75
15
Electric Fund Projected Debt Service
Page 76
16
Reserve Accounts
Page 77
17
Net Generation Forecast
Page 78
EXHIBIT #7
2013 Budget Review
Special Council Meeting of 05/29/13
Sample 1 Energy Rate Energy Rate Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Transmission $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Kwh for FY12 69,378,170 69,378,170 69,378,170
Charges at current rates $6,209,346.22 $5,231,114.02 $4,474,891.97
PCA Credit ($594,570.92) $0.00 $0.00
Total Due $5,614,775.30 $5,231,114.02 $4,474,891.97
PCA Credit/Rate Reduction ($594,570.92) ($383,661.28) ($756,222.05)
Page 79
Sample 2 Energy Rate Energy Rate Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Transmission $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Kwh for FY12 44,077,991 44,077,991 44,077,991
Charges at current rates $3,944,980.19 $3,323,480.52 $2,843,030.42
PCA Credit ($377,748.38) $0.00 $0.00
Total Due $3,567,231.81 $3,323,480.52 $2,843,030.42
PCA Credit/Rate Reduction ($377,748.38) ($243,751.29) ($480,450.10)
Page 80
Sample 3 Energy Rate Energy Rate Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Transmission $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Kwh for FY12 13,301,905 13,301,905 13,301,905
Charges at current rates $1,190,520.50 $1,002,963.64 $857,972.87
PCA Credit ($113,997.33) $0.00 $0.00
Total Due $1,076,523.17 $1,002,963.64 $857,972.87
PCA Credit/Rate Reduction ($113,997.33) ($73,559.53) ($144,990.76)
Page 81
Sample 4 Energy Rate Energy Rate Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Primary $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Kwh for FY12 2,389,032 2,389,032 2,389,032
Charges at current rates $213,818.36 $180,133.01 $154,092.56
PCA Credit ($20,474.00) $0.00 $0.00
Total Due $193,344.36 $180,133.01 $154,092.56
PCA Credit/Rate Reduction ($20,474.00) ($13,211.35) ($26,040.45)
Kwh for FY12 14,833,074 14,833,074 14,833,074
Charges at current rates $1,327,560.12 $1,118,413.78 $956,733.27
PCA Credit ($127,119.44) $0.00 $0.00
Total Due $1,200,440.68 $1,118,413.78 $956,733.27
PCA Credit/Rate Reduction ($127,119.44) ($82,026.90) ($161,680.51)
Total Reduction ($147,593.45) ($95,238.25) ($187,720.96)
Page 82
Sample 5 Energy Rate Energy Rate Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Primary $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Kwh for FY12 26,356,506 26,356,506 26,356,506
Charges at current rates $2,358,907.29 $1,987,280.55 $1,699,994.64
PCA Credit ($225,875.26) $0.00 $0.00
Total Due $2,133,032.03 $1,987,280.55 $1,699,994.64
PCA Credit/Rate Reduction ($225,875.26) ($145,751.48) ($287,285.92)
Page 83
Sample 6 Energy Rate Energy Rate Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Primary $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Kwh for FY12 1,548,720 1,548,720 1,548,720
Charges at current rates $138,610.44 $116,773.49 $99,892.44
PCA Credit ($13,272.53) $0.00 $0.00
Total Due $125,337.91 $116,773.49 $99,892.44
PCA Credit/Rate Reduction ($13,272.53) ($8,564.42) ($16,881.05)
Page 84
Sample 7 Energy Rate Energy Rate Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Primary $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Kwh for FY12 19,109,226 19,109,226 19,109,226
Charges at current rates $1,710,275.73 $1,440,835.64 $1,232,545.08
PCA Credit ($163,766.07) $0.00 $0.00
Total Energy charges $1,546,509.66 $1,440,835.64 $1,232,545.08
Demand Charges $0.00 $0.00 $0.00
Total Energy & Demand Charges $1,546,509.66 $1,440,835.64 $1,232,545.08
% Change
PCA Credit/Rate Reduction ($163,766.07) ($105,674.02) ($208,290.56)
Page 85
Sample 8 Rates as of Rates as of Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Primary $0.08950 $0.07540 $0.06450
Rate Change % -15.8% -14.5%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08093 $0.07540 $0.06450
Net Reduction % -9.6% -6.8% -14.5%
Demand Rate $11.25 $11.25 $11.25
Net Reduction % 0.0% 0.0%
FY12 Kwh's (Energy) 2,512,440 2,512,440 2,512,440
FY12 Kw (Demand) 5,353.4 5,353.4 5,353.4
Charges at current rates $224,863.38 $189,437.98 $162,052.38
PCA Credit ($21,531.61) $0.00 $0.00
Total Energy charges $203,331.77 $189,437.98 $162,052.38
Demand Charges $60,225.30 $60,225.30 $60,225.30
Total Energy & Demand Charges $263,557.07 $249,663.28 $222,277.68
% Change
PCA Credit/Rate Reduction ($21,531.61) ($13,893.79) ($27,385.60)
Page 86
Sample 9 Rates as of Rates as of Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Large Commercial (C5) Single Phase $0.09150 $0.07580 $0.06470
Rate Change % -17.2% -14.6%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08293 $0.07580 $0.06470
Net Reduction % -9.4% -8.6% -14.6%
Demand Rate $15.70 $15.70 $13.90
Net Reduction % 0.0% -11.5%
FY12 Kwh's (Energy) 2,431,840 2,431,840 2,431,840
FY12 Kw (Demand) 6,125.8 6,125.8 6,125.8
Charges at current rates $222,513.36 $184,333.47 $157,340.05
PCA Credit ($20,840.87) $0.00 $0.00
Total Energy charges $201,672.49 $184,333.47 $157,340.05
Demand Charges $96,175.06 $96,175.06 $85,148.62
Total Energy & Demand Charges $297,847.55 $280,508.53 $242,488.67
% Change
PCA Credit/Rate Reduction ($20,840.87) ($17,339.02) ($38,019.86)
Page 87
Sample 10 Rates as of Rates as of Proposed Rate
6/30/2012 7/1/2012 7/1/2013
Medium Commercial (C2) Single Phase $0.09150 $0.07580 $0.06470
Rate Change % -17.2% -14.6%
PCA Credit for Fiscal Year 2012 ($0.00857) $0.00000 $0.00000
Net Energy Charge $0.08293 $0.07580 $0.06470
Net Reduction % -9.4% -8.6% -14.6%
Demand Rate $15.70 $15.70 $13.95
Net Reduction % 0.0% -11.1%
FY12 Kwh's (Energy) 32,732 32,732 32,732
FY12 Kw (Demand) 182.2 182.2 182.2
Charges at current rates $2,994.98 $2,481.09 $2,117.76
PCA Credit ($280.51) $0.00 $0.00
Total Energy charges $2,714.46 $2,481.09 $2,117.76
Demand Charges $2,860.54 $2,860.54 $2,541.69
Total Energy & Demand Charges $5,575.00 $5,341.63 $4,659.45
% Change
PCA Credit/Rate Reduction ($280.51) ($233.38) ($682.18)
Page 88
City of Dover
Comparison of Tax Increase to Electric Rate Increase
(Electric Rate increase reflective of Energy only; no demand, power factor
or customer charges as included in total bill; PCA credit is included)
Property Tax Rate Energy Rate
Rate Increase - one cent $0.0100 $0.0100
Additional Revenue $311,676.58 $7,099,727.34
% Increase 3.0% 7.9%
Rate Increase for $3.4 Million $0.1090 $0.0048
Additional Revenue $3,397,274.72 $3,407,869.12
% Increase 32.3% 3.6%
Current PCA Credit ($0.00857)
Analysis by Customer for $3.4 Million in Revenue - Energy only:
Property Taxes Electric Energy
Transmission
DAFB Exempt $333,015.22
Kraft Foods $21,326.18 $211,574.36
Proctor & Gamble $12,838.02 $69,678.39
Primary Sample
Playtex Manufacturing $12,377.39 $42,335.54
Dover Downs $89,407.90 $126,511.23
Target $10,109.42 $7,433.86
Large Commercial Sample
Sheraton Dover Hotel $13,141.04 $12,585.02
J C Penney $8,361.61 $8,972.43
Boscov's $11,677.39 $12,123.65
Sears $9,674.08 $7,455.36
Lowes $12,366.92 $12,498.43
Residential Sample
Residential #1 $238.60 $88.58
Residential #2 $54.61 $39.57
Residential #3 $165.79 $69.52
Residential #4 $351.74 $68.29
Residential #5 $249.28 $124.28
Residential #6 $258.77 $75.47
Residential #7 $197.51 $98.74
Residential #8 $166.88 $36.00
Residential #9 $179.20 $56.38
Residential #10 $61.15 $83.19
Page 89
TRANSMISSION
DAFB - 69,378,170 Residential #1 218,900 18,454
Charges including rate increase $0.00 $5,809,034.17 Charges including rate increase $978.05 $2,606.26
Charges at current rates $0.00 $6,070,589.88 Charges at current rates $739.44 $2,675.83
PCA Credit N/A ($594,570.92) PCA Credit N/A ($158.15)
Total Due $0.00 $5,476,018.96 Total Due $739.44 $2,517.68
Revenue Increase $0.00 $333,015.22 Revenue Increase $238.60 $88.58
Kraft Foods 19,565,300 44,077,991 Residential #2 50,100 8,244
Charges including rate increase $87,417.76 $3,690,650.19 Charges including rate increase $223.85 $1,164.30
Charges at current rates $66,091.58 $3,856,824.21 Charges at current rates $169.24 $1,195.38
PCA Credit N/A ($377,748.38) PCA Credit N/A ($70.65)
Total Due $66,091.58 $3,479,075.83 Total Due $169.24 $1,124.73
Revenue Increase $21,326.18 $211,574.36 Revenue Increase $54.61 $39.57
Proctor & Gamble 11,778,000 14,516,331 Residential #3 152,100 14,484
Charges including rate increase $52,624.10 $1,215,452.39 Charges including rate increase $679.58 $2,045.58
Charges at current rates $39,786.08 $1,270,178.96 Charges at current rates $513.79 $2,100.18
PCA Credit N/A ($124,404.96) PCA Credit N/A ($124.13)
Total Due $39,786.08 $1,145,774.01 Total Due $513.79 $1,976.05
Revenue Increase $12,838.02 $69,678.39 Revenue Increase $165.79 $69.52
PRIMARY
Playtex Manufacturing 11,355,400 8,819,904 Residential #4 322,700 14,227
Charges including rate increase $50,735.93 $756,130.37 Charges including rate increase $1,441.82 $2,009.28
Charges at current rates $38,358.54 $789,381.41 Charges at current rates $1,090.08 $2,062.92
PCA Credit N/A ($75,586.58) PCA Credit N/A ($121.93)
Total Due $38,358.54 $713,794.83 Total Due $1,090.08 $1,940.99
Revenue Increase $12,377.39 $42,335.54 Revenue Increase $351.74 $68.29
Dover Downs 82,025,600 26,356,506 Residential #5 228,700 25,891
Charges including rate increase $366,490.38 $2,259,543.26 Charges including rate increase $1,021.83 $3,656.59
Charges at current rates $277,082.48 $2,358,907.29 Charges at current rates $772.55 $3,754.20
PCA Credit N/A ($225,875.26) PCA Credit N/A ($221.89)
Total Due $277,082.48 $2,133,032.03 Total Due $772.55 $3,532.31
Revenue Increase $89,407.90 $126,511.23 Revenue Increase $249.28 $124.28
Target 9,274,700 1,548,720 Residential #6 237,400 15,723
Charges including rate increase $41,439.36 $132,771.77 Charges including rate increase $1,060.70 $2,220.56
Charges at current rates $31,329.94 $138,610.44 Charges at current rates $801.94 $2,279.84
PCA Credit N/A (13,272.53) PCA Credit N/A ($134.75)
Total Due $31,329.94 $125,337.91 Total Due $801.94 $2,145.09
Revenue Increase $10,109.42 $7,433.86 Revenue Increase $258.77 $75.47
LARGE COMMERCIAL Residential #7 181,200 20,571
Sheraton Dover Hotel 12,056,000 2,621,880 Charges including rate increase $809.60 $2,905.24
Charges including rate increase $53,866.21 $230,017.53
Charges at current rates $612.09 $2,982.80
Charges at current rates $40,725.17 $239,902.02 PCA Credit N/A ($176.29)
PCA Credit N/A (22,469.51) Total Due $612.09 $2,806.50
Total Due $40,725.17 $217,432.51
Revenue Increase $197.51 $98.74
Revenue Increase $13,141.04 $12,585.02
J C Penney 7,671,200 1,869,256 Residential #8 153,100 7,501
Charges including rate increase $34,274.92 $163,989.83 Charges including rate increase $684.05 $1,059.37
Charges at current rates $25,913.31 $171,036.92 Charges at current rates $517.17 $1,087.65
PCA Credit N/A (16,019.52) PCA Credit N/A ($64.28)
Total Due $25,913.31 $155,017.40 Total Due $517.17 $1,023.36
Revenue Increase $8,361.61 $8,972.43 Revenue Increase $166.88 $36.00
Boscov's 10,713,200 2,525,760 Residential #9 164,400 11,745
Charges including rate increase $47,866.58 $221,584.92 Charges including rate increase $734.54 $1,658.75
Charges at current rates $36,189.19 $231,107.04 Charges at current rates $555.34 $1,703.03
PCA Credit N/A (21,645.76) PCA Credit N/A ($100.65)
Total Due $36,189.19 $209,461.28 Total Due $555.34 $1,602.37
Revenue Increase $11,677.39 $12,123.65 Revenue Increase $179.20 $56.38
Sears 8,875,300 1,553,200 Residential #10 56,100 17,332
Charges including rate increase $39,654.84 $136,262.24 Charges including rate increase $250.65 $2,447.80
Charges at current rates $29,980.76 $142,117.80 Charges at current rates $189.51 $2,513.14
PCA Credit N/A (13,310.92) PCA Credit N/A ($148.54)
Total Due $29,980.76 $128,806.88 Total Due $189.51 $2,364.60
Revenue Increase $9,674.08 $7,455.36 Revenue Increase $61.15 $83.19
Lowes 11,345,800 2,603,840
Charges including rate increase $50,693.03 $228,434.88
Charges at current rates $38,326.11 $238,251.36
PCA Credit N/A (22,314.91)
Total Due $38,326.11 $215,936.45
Revenue Increase $12,366.92 $12,498.43
Page 90
EXHIBIT #8
2013 Budget Review
Special Council Meeting of 05/29/13
Dover Police Department
FY14 Police Vehicle, Equipment & Installation Costs
Item Cost Totals Remarks
Patrol Vehcile
2014 Dodge Charger Police Interceptor $ 23,500.00
base rate $ 22,965.00
Vinyl seats 150.00
Driver’s spot light 200.00
Inop rear doors 25.00
Full size spare 160.00
Additional Vehicle Options
Setina Partition 725.00 *
Prisoner Seat and Pan 795.00 *
Vehcile Equipment & Installation 18,790.00
Lights (unmarked) 1,600.00 *
Lights (marked) 2,500.00
Siren/speakers 750.00
Marking 600.00
Hot Dog (K9 vehicle) 500.00 *
Hot Dog installation 50.00 *
* not included in totals
K9 Cage 1,500.00 *
Cage installation 350.00 *
Installation (lights & equipment) 550.00
800 MHZ radio 3,500.00
HubData911 computer & in-car camera system 10,500.00
Wireless printer 390.00
Additional Accessories: 852.00
Shotgun Rack Mount 245.00
Security Screen/Partition (379) or Partition only (47 479.00
First Aid Kit 39.00
Fire Extinguisher 29.00
Broom 15.00
Latent Kit 45.00
Total Cost $ 43,142.00
Staff/CI Vehcile
2014 Ford Fusion 24,000.00
Vehcile Equipment & Installation 500.00
Lights 150.00
Siren/speaker 200.00
installation 150.00
Total Cost $ 24,500.00
Police Motorcycle
2014 Harley Davidson FLHP Police Motorcycle 19,400.00
Vehcile Equipment & Installation 10,450.00
Lights 1,500.00
Siren/speakers 400.00
Marking 350.00
Installation (lights & equipment) 300.00
800 MHZ radio 3,500.00
Mobile computer (Panasonic Toughbook) 4,100.00
Wireless printer 300.00
Total Cost $ 29,850.00
as of: 5/30/13
Page 91
Dover Police Department
FY14 Police Officer Payroll Costs
Item Breakout Totals Remarks
Salary $61,028.39 based on FY14 budget
Base salary $52,700.00
Overtime 6,845.75
Shift Differential 1,482.64
Benefits 26,375.27
Social Security/Medicare 4,600.00
Health Insurance 6,319.36 employee (PPO)
Life Insurance 98.02
Retirement 8,179.04
Worker's Compensation 2,408.18
Disability & AD&D 146.17
Vision Insurance 39.60
OPEB 4,584.90
Total Salary + Benefits $87,403.66
Training, Uniforms, Equipment & Ammo 10,892.50 details at 2nd tab
Patrol Vehicle, Equipment & Installation 43,142.00 details at 3rd tab
Total Cost Per Officer $141,438.16
Page 92
Dover Police Department
FY12 Police Officer Uniforms & Equipment Costs
Qty Unit Extended
Item Issd Cost Cost Remarks
Training Cost Training (acct 30-28)
DE State Police Academy Tuition 1 $1,100.00 $1,100.00
Uniform Items (priced for average male uniform) Uniforms (acct 20-29)
Ballistic vest 1 680.00 680.00
Class A jacket 1 350.00 350.00
Class A pants 1 84.50 84.50
Gore-Tex jacket w/liner 1 267.50 267.50
Hat badge (silver) 1 26.00 26.00
Hat, crushed style 1 60.00 60.00
Metal insignia - silver DPDs 1 6.00 6.00
Metal insignia - silver name pin 2 7.00 14.00
Patches 10 4.50 45.00
Raincoat 1 150.00 150.00
Shirt badge 2 110.00 220.00
Shoes 1 175.00 175.00
Sliding dee/suicide strap 1 35.00 35.00
Tie 1 12.00 12.00
Tie bar 1 10.00 10.00
Uniform pants (summer) 3 84.50 253.50
Uniform pants (winter) 3 84.50 253.50
Uniform shirt (summer-short sleeve) 3 80.50 241.50
Uniform shirt (winter-long sleeve) 3 74.50 223.50
Wallet badge 1 50.00 50.00
Whistle & chain 1 12.00 12.00
Uniform Items Subtotal $3,169.00
Duty Belt Equipment Program Supplies (acct 20-26)
Baton, expandable 1 100.00 100.00
Baton holder 1 20.00 20.00
Chemical spray case 1 16.50 16.50
Chemical spray (Kap-Stun) 1 12.00 12.00
CPR Case 1 17.00 17.00
Duty bag (deluxe) 1 25.00 25.00
Duty belt (smooth leather) 1 32.00 32.00
Glock 22 Pistol/27 1 465.00 465.00
Glock ammo clip - magazine holder 1 22.00 22.00
Glock holster 1 120.00 120.00
Handcuff case (double) 1 27.00 27.00
Handcuffs 2 35.00 70.00
Radio swivel case/holder 1 100.00 100.00
Radio, 800 MHz portable 1 3,500.00 3,500.00
Stinger flashlight 1 75.00 75.00
Stinger flashlight holder 1 22.00 22.00
Taser / holster 1 1,000.00 1,000.00
Duty Belt Equipment Subtotal $5,623.50
Ammunition $1,000.00 Program Supplies (acct 20-26)
Police Academy qualificatioin 1000 pistol and 200 shotgun rounds
Department requirements indoor & outdoor range qualifications scheduled semi-annually
Grand Total $10,892.50 *
as of: 5/30/13
Page 93
EXHIBIT #9
2013 Budget Review
Special Council Meeting of 05/29/13
EXHIBIT #9
2013 Budget Review
Special Council Meeting of 05/29/13
Page 94
EXHIBIT #10
2013 Budget Review
Special Council Meeting of 05/29/13
Page 95
EXHIBIT #11
2013 Budget Review
Special Council Meeting of 05/29/13
Page 96
EXHIBIT #12
2013 Budget Review
Special Council Meeting of 05/29/13
Page 97
EXHIBIT #13
2013 Budget Review
Special Council Meeting of 05/29/13
Ambulance Service for
Robbins Hose Fire District
Page 98
Growth; Since 2002
7000 6599
6259
5802 6114
6000
5496
4925
5000
4460 4518
3860 4002 4092
4000
3000
2000
1000
0
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Page 99
Continued Growth and
Outside Coverage
9000
7741
8000
6969 7148 1142
7000
855 889
6000
5000
6114 6259 6599 Outside Jurisdiction
4000
Responded by Dover
3000
2000
1000
0
2010 2011 2012
Page 100
Ambulance Departments - 2012 Totals
Department Yearly Totals
American Legion (Smyrna) 3,109
Bowers 373
Camden 2,508
Carlisle 2,785
Cheswold 1,743
Dover 6,599
Dover AFB 127
Felton 1,245
Frederica 461
Harrington 1,904
Hartly 766
Leipsic 302
Magnolia 966
Marydel 487
Page 101
• Total # of dispatched calls to Dover serviced
by outside agencies for 2012 is 1,142; 95 of
them were for “stand by” at Dover Downs
(1,047) subtract the scratches.*
• Total # of dispatched calls serviced by Prime
Care for Dover in 2012 is 6,599 bringing total
calls for Dover to 7,741
• Total # of calls Dover was dispatched to other
districts in 2012 is 95
* A call is listed as a scratch when more than one ambulance service responds
to the same call. On multiple occasions we had 2-3 ambulances responding.
Obviously only one hauled the victim away so the others were “scratches” - In
the documentation provided by 911 there was no way of knowing which
company did not fulfill the calls. In rare occasions multiple ambulances would
be used such as for MVC’s (motor vehicle collisions)
Page 102
PRIMECARE CONTRACT
• One ambulance 24/7
• Another ambulance 7:00 am – 11:00 pm
• Our current contract with Primecare expires on March 31,
2015
(Previous contracts with the City date back to 2003)
• By having Primecare housed out of Dover it significantly
reduces response times to our constituents
• Provides first ambulance at no cost – 2nd ambulance is
charged at $19, 466 month
• Due to time involved with the city they have familiarity
which also reduces times
• Now have a bariatric unit housed in Dover
Page 103
AGENCY Dispatched Stand Duplicate Real Dover $25 per
By Response Number Responses response
American 79 14 17 48 1 $1,175
Legion
(Smyrna)
Bowers 14 5 1 8 1 $175
Camden 403 5 62 336 42 $7,350
Carlisle 2 0 0 2 3 $50
Cheswold 416 5 52 359 20 $8,475
Dagsboro 34 7 3 24 0 $600
Felton 16 1 6 9 0 $225
Frederica 1 0 0 1 0 $25
Harrington 2 0 0 2 0 $50
Hartly 94 46 14 34 1 $850
Leipsic 55 11 16 28 21 $700
Magnolia 45 1 22 22 5 $550
Marydel 15 4 4 7 1 $175
Total Calls 1,142 99 197 880 95 $22,000
Page 104
CAMDEN AMBULANCE
• Dispatched 403
• Of those 403 – 5 were “stand by” at Dover Downs or another
business
(403-5=398)
• 62 of those 398 were duplicated responses and/or scratches.
(398-62=336)
• 336 calls in 2012 Dover also responded to your district a total of 42
times
• Total: 294 calls x $25 call = $7,350
• Now if we give 50% of the calls the benefit of the doubt that your
agency was the one that completed the call that would be adding
on 31 calls bringing your total to 325 calls.
• 325 x $25 a call = $8,125
Page 105
CHESWOLD AMBULANCE
• Dispatched 416
• Of those 416 – 5 were “stand by” at Dover Downs or another
business
(416-5=411)
• 52 of those 411 were duplicated responses and/or scratches.
(411-52=359)
• 359 calls in 2012 Dover also responded to your district a total of 20
times
• Total: 339 calls x $25 call = $8,475
• Now if we give 50% of the calls the benefit of the doubt that your
agency was the one that completed the call that would be adding
on 26 calls bringing your total to 365 calls.
• 365 x $25 a call = $9,125
Page 106
YTD 2013 Stats
• Total # of calls Dover has responded to so far
this year – 2,598
Districts 2013 YTD Number of times
Dispatched responded to Dover
Dover 2,598
Camden 1121 168*
Cheswold 612 155*
In the Robbins Hose Fire District - January 1-May 31, 2013
Camden has responded to 168
Cheswold has responded to155
These numbers reflect almost identical to the same number of assists from
neighboring jurisdiction from the 2012 calendar year data that was
analyzed
(*These are “raw” numbers scratches and duplicates have not been subtracted)
Page 107
Why make the donation?
• There is no set timeframe where the influx in calls
is, making it so that additional coverage would
not be beneficial since we are only utilizing the
current 2nd ambulance 28% of the time
• By donating funds to Camden and Cheswold it
maintains good neighbors
• Compensates for time out of their district
• To add additional coverage it would cost the city
approximately $100,000 – donation to the two
entities that cover Dover totals $17, 250
Page 108
EXHIBIT #14
2013 Budget Review
Special Council Meeting of 05/29/13
City of Dover
Budget Meeting
June 5, 2013
General Fund Budget & Forecast EXHIBIT #14
Water/Wastewater Fund Budget & Forecast
2013 Budget Review
Special Council Meeting of 05/29/13
Page 110
General Fund – As presented May 29, 2013
3
Page 111
Policy Compliance – Sensitivity Analysis
4
Page 112
Scenario Options – Five Year Horizon – FY14 thru FY18
5
Page 113
Scenario 1 – FY14 Only
6
Page 114
Policy Compliance – Scenario 1 – FY14 Only
7
Page 115
Scenario 2 – Five Year Horizon – FY14 thru FY18
8
Page 116
Policy Compliance – Five Year Horizon – FY14 thru FY18
9
Page 117
Water/Wastewater Fund
10
Page 118
Water with Calpine (Revenue only)
11
Page 119
Wastewater with Calpine (Revenue only)
12
Page 120
FY16 Forecast - Wastewater Rate Change
• In City
o From $2.65 to $2.86 or $.21 (5,000 gal customer = $1.05)
• Out of City
o From $3.98 to $4.30 or $.32 (5,000 gal customer = $1.60)
13
Page 122
Electric Capital Investment Plan
• Meter Replacements with smart meters $150,000
• Increases the transfers to the Improvement &
Extension Fund
• All adjustments will be included in the budget
ordinance
15
Page 123
EXHIBIT #15
2013 Budget Review
Special Council Meeting of 05/29/13