CITY OF DOVER, DELAWARE
COUNCIL COMMITTEE OF THE WHOLE MEETING
Tuesday, July 27, 2021 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Public comments are welcomed on any item and will be permitted at the appropriate time. When possible,
please notify the City Clerk (736-7008 or email at cityclerk@dover.de.us) should you wish to be
recognized.
This meeting will be held in City Hall Council Chambers with electronic access via WebEx. Public
Participation information is as follows:
Dial: 1-408-418-9388
Link: https://rb.gy/funzw3
Event number: 179 624 5087
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the
meeting starts.
CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
ADOPTION OF THE AGENDA
ACTIONABLE ITEMS
1. Replacement of 2003 Pierce Lance Engines 3 and 6 (Matt Harline, Interim City Manager)
(Staff recommendation: Approval of the purchase of 2022 Pierce Enforcer Pumper)
2. Discussion of Regular Council Meeting Start Time (Councilman William Hare)
(Recommendation: Change Regular Council Meeting start time to 6:30 p.m. beginning in
September 2021)
3. Evaluation of New Monthly Reports by the Mayor, Council President, and Members of
City Council
1
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING - July 27, 2021 PAGE 2
ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
ADOPTION OF THE AGENDA
ACTIONABLE ITEMS
4. Dover Bicycle and Pedestrian Plan Update (Marilyn Smith, Executive Director,
Dover/Kent County Metropolitan Planning Organization (MPO) and Leah Kacanda,
Project Manager, Whitman, Requardt & Associates, LLP)
(MPO Recommendation: Adoption of the Dover Bicycle and Pedestrian plan as presented
(Plan was adopted by MPO Council on May 5, 2021))
ADJOURNMENT OF THE SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
2
Page 3
ACTION FORM
Item 1.
PROCEEDING: Council Committee of the Whole – Legislative, Finance & Administration Committee
DEPARTMENT OF ORIGIN: Fire/Robbins Hose DATE SUBMITTED: July 12, 2021
PREPARED BY: David Carey, Fire Chief
SUBJECT: Replacement of 2003 Pierce Lance Engines 3 and 6
REFERENCE: Capital Investment Plan, FY21/22 Budget
RELATED PROJECT: N/A
REVIEWED BY: Matthew Harline, Interim City Manager / Lori Peddicord, Controller
EXHIBITS: Bid Page – Atlantic Emergency Solutions
EXPENDITURE REQUIRED: up to $729,900.00
AMOUNT BUDGETED: $ 720,000.00 (est. $77,000 annual payments for 10 years)
FUNDING SOURCE (Dept./Page in CIP & Budget): Fire Department Budget
TIMETABLE: Upon approval the Apparatus will be ordered. Estimated Delivery would be mid-2022.
RECOMMENDED ACTION: Staff recommends approval of the purchase of 2022 Pierce Enforcer Pumper.
BACKGROUND AND ANALYSIS
In accordance with the CIP for Fiscal Year 2021/2022 (FY22), the Robbins Hose Company is requesting the
replacement of Engine 3 and 6 which are 2003 Pierce Lance Engines. The engines will be 19 years old in 2022
and were originally on a 15-year replacement program in accordance with the National Fire Protection
Association (NFPA) standards. Furthermore, we are reducing the size of our fleet by replacing two engines
with one engine which reduces the apparatus replacement cost to the city while still maintaining an optimum
fleet of fire apparatus to serve Dover residents and businesses. Engine 3 and 6 have served the Robbins Hose
Company and the citizens of Dover well. However, due to the age of Engines 3 & 6, we are having extended
down times for maintenance due to parts being scarce. An engine out of service reduces the fire protection for
the citizens of Dover.
Fire Chief Carey appointed a committee to create bid specifications for the replacement Engine which were then
reviewed by Procurement Officer, Barry Wolfgang and a Request for Bids was issued by the City. The
specifications were created based off the current apparatuses with fire suppression and safety upgrades added.
The RFB was advertised on the City website and sent to three vendors directly. The City received one bid from
Atlantic Emergency Solutions for a Pierce Enforcer Pumper at $729,900.00. The Fire Department’s estimated
the cost of the engine at 720,000.00. The City will finance the truck over ten years and $77,000 is budgeted for
this purchase in the FY22 CIP which includes financing costs. Because delivery is not anticipated until the end
of FY22, at best, there is more than adequate funding budgeted this year if the Committee/Council accepts the
cost of the vehicle.
With the cost of the engine, and the fact that only one bid was received, it requires the approval of the City
Council and therefore must also be brought before the Council Committee of the Whole. The apparatus will be
financed with a ten-year bank qualified tax-exempt loan. Annual payments will be reflected in future budgets.
A Resolution for financing will be presented to City Council prior to the apparatus delivery.
The Fire Chief wants council to be aware of the following safety upgrades that are included in this specification
which are not currently on Engines 3 or 6 since they were not available at the time of purchase: Advanced ABS
braking system, Tire Pressure Management System, Seat Belt Alarms, Side Roll Protection, LED warning lights
on the cab doors (exit), Vehicle Data Recorder (black box), Insta Chains and Frontal and Side Impact Air Bags,
all for the protection of our firefighters. 3
Page 4
Item 1.
BID PAGE
Pierce Enforcer Pumper $ 729,900.00
121 Patriot Drive Middletown Delaware Toll Free: 800.442.9700
www.atlanticemergency.com
4
Page 5
7/21/2021 Dover, DE Code of Ordinances
Sec. 9. - Meetings of mayor and council—Generally. Item 2.
At 7:30 p.m. on the second Monday in May following a regular municipal election, the mayor and council
shall meet at the usual place for holding council meetings and the newly elected officers shall assume the
duties of office, being first duly sworn or affirmed to perform their duties with fidelity. Such meeting shall be
called or known as the annual meeting. Thereafter, the council shall hold regular meetings at such times as
may be prescribed by ordinance, but not less frequently than once each month. Special meetings may be
called and held as prescribed by ordinance. All meetings of the council shall be open to the public except
scheduled executive sessions.
At the annual meeting held on the second Monday in May, the members of council shall elect one of
their members to serve as council president, such term to be in effect until the next regularly scheduled
annual meeting or until a successor is elected. The council president shall serve as vice-mayor. Council
president shall preside over regular and special council meetings.
The mayor shall preside over the annual meeting and quarterly town meetings, and at the annual
meeting present a state of the city message and offer mayoral appointments for council confirmation. The
mayor, upon recommendation from the council president, will present council appointments for council
approval.
In the event of absence of the council president, then the senior member of council in terms of length of
service as a councilman shall assume the duties of the council president and shall be designated council
president acting. In the event that two (2) or more members of council have the same seniority in terms of
length of service as a councilman, then the members of council shall vote and elect one of those as council
president acting. Council president acting shall fulfill all of the duties and responsibilities of council
president during his/her period of unavailability or absence.
(Amd. of 7-12-2005 (S.B. 126))
5
1/1
Page 6
Item 4.
Dover Bicycle and Pedestrian Plan
Committee of the Whole Meeting | July 27, 2021
6
Page 7
Background Information Item 4.
P L AN T EAM
• Dover/Kent County Metropolitan Planning Organization
− Plan funding and administration
• City of Dover
− Plan client
• DelDOT
− Technical resources and reviews
• Whitman, Requardt & Associates, LLP
− Consultant transportation planners and engineers
− Perform study and prepare plan
7
Page 8
Background Information Item 4.
P L AN P URP OS E
• Integrate recommendations from the Dover Bicycle Plan (2015),
Dover Pedestrian Plan (2015), and Regional Bike Plan (2017)
• Apply guidance from the Blueprint for A Bicycle Friendly
Delaware: A Statewide Policy Plan (2018)
• Incorporate recommendations from the City of Dover
Comprehensive Plan (2020)
• Use Level of Traffic Stress analysis and a gap analysis to identify
pedestrian and bicycle projects that will reduce stress and
improve safety for pedestrians and bicyclists across the City
8
Page 9
Who participated in the process?
Item 4.
PUBLIC INVOLVEMENT
• Public Workshop at
Dover Library on
October 21, 2019
• Staff from City, MPO,
and DelDOT available
• Draft plan and online
survey available
September 1-30, 2020
• Survey distributed via
City website and
social media
• 9 people submitted
feedback
9
Page 10
How were project recommendations developed? Item 4.
SIX “Es” OF ACTIVE TRANSPORTATION PLANNING
10
Source: League of American Cyclists
Page 11
How were project recommendations developed?
Item 4.
PEDESTRIAN GAP ANALYSIS
11
Source: DelDOT
Page 12
How were project recommendations developed?
Item 4.
BICYCLE LEVEL OF TRAFFIC STRESS (LTS)
12
Source: FHWA Bikeway Selection Guide
Page 13
How were project recommendations developed? Item 4.
LEVEL OF TRAFFIC STRESS (LTS)
13
Source: DelDOT
Page 14
How were project recommendations developed?
Item 4.
Planned Projects
14
Page 15
RecommendationsItem 4.
ALL USERS PROJECTS (BOTH WALKING AND BICYCLING)
15
Page 16
Recommendations
Item 4.
WALKING PROJECTS
16
Page 17
Recommendations
Item 4.
BICYCLING PROJECTS
17
Page 18
Discussion
Item 4.
18
Page 19
Item 4.
Thank you!
Whitman, Requardt & Associates, LLP
Leah Kacanda, Project Manager
19
Page 20
Item 4.
DOVER
BICYCLE AND
PEDESTRIAN
PLAN
2020
City of Dover
Dover/Kent County
Metropolitan Planning Organization
Delaware Department of Transportation
20
Page 21
Item 4.
THIS PAGE INTENTIONALLY LEFT BLANK
21
Page 22
ACKNOWLEDGEMENTS
Item 4.
PROJECT PARTNERS
City of Dover
Dover/Kent County Metropolitan Planning Organization
Delaware Department of Transportation
STAFF COMMITTEE
Matthew Harline, City of Dover
Robin Eaton, City of Dover
Dave Hugg, City of Dover
Ralph Taylor, Dover City Council Member
Jim Galvin, Dover/Kent County MPO
Anthony Aglio, DelDOT
John Fiori, DelDOT
Paul Moser, DelDOT
CONSULTANT
Whitman, Requardt & Associates, LLP
22
Page 23
Item 4.
THIS PAGE INTENTIONALLY LEFT BLANK
23
Page 24
TABLE OF CONTENTS
Item 4.
Executive Summary...................................................................................................................................................... 1
1. Introduction ........................................................................................................................................................... 5
Purpose ............................................................................................................................................................. 6
Benefits of Active Transportation ................................................................................................................... 7
Public Involvement .......................................................................................................................................... 8
Accomplishments ............................................................................................................................................ 9
2. Existing Conditions .............................................................................................................................................. 13
Land Use ......................................................................................................................................................... 14
Population & Demographics........................................................................................................................ 17
Current Plans, Policies, & Programs ............................................................................................................. 20
The Transportation Network.......................................................................................................................... 34
Crash Analysis................................................................................................................................................. 42
3. Where We’re Headed ........................................................................................................................................ 45
Goals & Objectives........................................................................................................................................ 46
Agency Support ............................................................................................................................................. 47
Advocacy and Interest Groups ................................................................................................................... 47
4. What’s Underway................................................................................................................................................ 49
Walking in Dover ............................................................................................................................................ 50
Biking in Dover ................................................................................................................................................ 56
Planned DelDOT Projects .............................................................................................................................. 66
5. How We Get There.............................................................................................................................................. 77
Opportunities .................................................................................................................................................. 78
Recommendations ........................................................................................................................................ 81
Plan Implementation ................................................................................................................................... 122
6. Appendices ....................................................................................................................................................... 125
Walkable Communities Report Card ........................................................................................................ 126
Bicycle Friendly Community Report Card ................................................................................................ 131
24
Page 25
Item 4.
THIS PAGE INTENTIONALLY LEFT BLANK
25
Page 26
FIGURES
Item 4.
Figure 1. Dover's walkable historic downtown ......................................................................................................... 2
Figure 4. Phase I of the Senator Bikeways ............................................................................................................... 11
Figure 5. Map showing City of Dover Land Use ..................................................................................................... 15
Figure 6. First Fridays in Dover.................................................................................................................................... 16
Figure 7. Annual Amish Country Bike Tour ............................................................................................................... 16
Figure 8. Map of the City of Dover........................................................................................................................... 17
Figure 9. Map showing percentage of households with no vehicle available ................................................. 18
Figure 10. Map showing percentage of population living below poverty level ............................................... 18
Figure 11. Map showing percentage of population under 18 ............................................................................. 19
Figure 12. Map showing percentage of population over 65 ............................................................................... 19
Figure 13. HAWK Signal at SR 8 and Heatherfield Way ........................................... Error! Bookmark not defined.
Figure 13. HAWK Signal at SR 8 and Heatherfield Way ......................................................................................... 32
Figure 14. Sidewalk gap on Hazlettville Road at Nottingham Meadows ........................................................... 32
Figure 15. Dover Transit Center study area ............................................................................................................. 33
Figure 16. Rendering of proposed North Street Gateway .................................................................................... 33
Figure 17. Sharrows on W. Loockerman Street in Downtown Dover ................................................................... 34
Figure 18. Ribbon cutting at the West Street Trail at the Dover Transit Center .................................................. 37
Figure 19. Map showing pedestrian facilities.......................................................................................................... 39
Figure 20. Map showing bicyclist facilities including shared use pathways and low-stress streets ................. 41
Figure 21. Pedestrian & Bicycle Crashes 2013-2019 ............................................................................................... 42
Figure 22. Pedestrian & Bicycle Crashes Time of Day, 2013-2019 ........................................................................ 42
Figure 23. Pedestrian crash locations, 2013-2019 ................................................................................................... 43
Figure 24. Bicycle crash locations, 2013-2019 ......................................................................................................... 43
Figure 25. Pedestrian Project Prioritization Criteria ................................................................................................. 51
Figure 26. Detail of DelDOT ADA Self- Assessment Map........................................................................................ 55
Figure 27. Bicyclist design user profiles from the FHWA Bikeway Selection Guide. ........................................... 59
Figure 28. Seven Principles of Bicycle Network Design from the Bikeway Selection Guide. ............................ 59
Figure 29. Level of Traffic Stress descriptions and examples ................................................................................ 60
Figure 30. Level of Traffic Stress evaluation chart .................................................................................................. 60
Figure 31. Level of Traffic Stress in the City of Dover .............................................................................................. 61
Figure 32. Map of DelDOT planned projects .......................................................................................................... 67
Figure 33. DelDOT Projects Portal ............................................................................................................................. 75
Figure 34. Summary of the Walk Friendly Communities Community Report Card. ........................................... 79
Figure 35. Bicycle Friendly Community Dover, DE Fall Report Card excerpt ..................................................... 80
Figure 36. The six "Es" of active transportation planning........................................................................................ 81
Figure 37. MUTCD compliant bicycle wayfinding signage................................................................................... 82
Figure 38. Map showing locations of projects for all users .................................................................................... 87
Figure 39. Map showing locations of walking projects ......................................................................................... 97
Figure 40. Map showing locations of bicycling projects ..................................................................................... 107
26
Page 28
EXECUTIVE SUMMARY
Item 4.
28
DOVER BICYCLE AND PEDESTRIAN PLAN ׀1
Page 29
Item 4.
Figure 1. Dover's walkable historic downtown
29
DOVER BICYCLE AND PEDESTRIAN PLAN ׀2
Page 30
Item 4.
The transportation network in Dover is constantly changing as public projects are implemented and new
private development occurs. The Dover Bicycle and Pedestrian Plan will guide improvements to the
transportation network for people who walk and bike. This plan builds on the Dover Pedestrian and Bicycle
Plans that were completed in 2015 and the Regional Bicycle Plan which was completed in 2017. It also
incorporates recommendations from the Blueprint for a Bicycle Friendly Delaware, Delaware’s statewide
bicycle policy plan which was completed in 2018.
The most notable change from previous Dover planning documents is the incorporation of a methodology
called Level of Traffic Stress (LTS). LTS provides a quantitative way to assess the amount of stress a person on
a bike experiences when riding on any given roadway in the City. LTS acknowledges that most adults are
comfortable riding a bike on the road in low-stress circumstances but that high-stress roadways create
barriers and “islands” of low-stress connectivity. LTS allows for improved bicycle network planning and the
prioritization of improvements that close “gaps” in the low-stress network. More information about LTS and
how it is incorporated into project and network planning is included on pages 60-61.
The plan has five main sections as described below:
• Introduction: The purpose of this plan and benefits of walking and bicycling are reviewed. The
public participation process is described, along with accomplishments since 2015.
• Existing Conditions: Planning for people who walk and bike requires looking at more than just the
transportation network. Current land use shows where people live, work, shop and play,
highlighting origins and destinations across the City. Demographic information shows where
demand for walking and biking may be higher due to factors such as low car ownership or a high
percentage of youth. An overview of current plans, policies, and procedures that impact the
transportation network concludes this section.
• Where We’re Headed: The most important thing a plan does is set goals and objectives, but
support from agencies, advocacy and interest groups, and the City of Dover is critical to
advancing those objectives.
• What’s Underway: Dover isn’t starting from scratch. It already has a robust pedestrian and bicycle
network, with more projects in the pipeline for completion. This section reviews those efforts,
providing detailed information about gaps in the network.
• How We Get There: This section includes recommendations in five separate categories: education,
encouragement, enforcement, evaluation and planning, and engineering. Project
recommendations (engineering) are broken up into projects that benefit all users, people who
walk, and people who bike. A brief overview of the prioritization process upon the completion of
this document is provided.
30
DOVER BICYCLE AND PEDESTRIAN PLAN ׀3
Page 31
Item 4.
31
DOVER BICYCLE AND PEDESTRIAN PLAN ׀4
Page 32
1. INTRODUCTION
Item 4.
32
DOVER BICYCLE AND PEDESTRIAN PLAN ׀5
Page 33
Item 4.
Purpose
The Dover Bicycle and Pedestrian Plan is the product of a planning process that was initiated by public
interest and support. In 1997, the City developed its first Bicycle and Pedestrian Transportation Plan, which
was incorporated into the City's Comprehensive Plan. Through extensive public involvement, this initial plan
provided an assessment of existing conditions for biking and walking in the City, as well as specific
recommendations, an implementation strategy, and potential funding sources. Since the adoption of the
first plan, walking and bicycling have taken on an increasing level of importance at the Federal, State, and
local levels as transportation agencies have realized the effectiveness of these modes as alternatives to the
use of a motor vehicle. Walking and bicycling also provide measurable health, quality of life, environmental,
and economic benefits to the community.
The benefits of walking and bicycling have been recognized by the US Department of Transportation
through the creation of funding sources dedicated to these modes of travel. In addition, the Delaware
Department of Transportation (DelDOT) has recognized the importance of walking and bicycling as
transportation modes and has established full-time Pedestrian Coordinator and Bicycle Coordinator
positions to ensure that the needs of both user groups are incorporated into DelDOT projects throughout
the state.
Planning for bicycle and pedestrian infrastructure has continued at the local level. In 2015, the City updated
the Pedestrian and Bicycle Plan by creating two standalone documents: The City of Dover Pedestrian Plan
and the City of Dover Bicycle Plan. In 2017, the Dover/Kent County MPO updated the Regional Bicycle Plan,
which included additional project ideas for the City of Dover. In 2018, recognizing that municipalities and
projects would benefit from increased guidance regarding bicycle specific projects, the State completed
the Blueprint for A Bicycle Friendly Delaware: A Statewide Policy Plan (the Blueprint Plan).
This document serves to integrate the recommendations from the Dover Bicycle Plan (2015), Dover
Pedestrian Plan (2015), and Regional Bike Plan (2017) and apply guidance from the Blueprint Plan.
The City of Dover adopted an updated Comprehensive Plan in January 2020. The Transportation Plan
section describes conditions for walking and bicycling in Dover, explaining that the transportation network
has improved thanks to the gradual implementation of the 2015 Pedestrian and Bicycle Plans. The
Comprehensive Plan describes Level of Traffic Stress analysis as a useful tool to target investments in bicycle
and pedestrian improvements to improve safety and encourage greater use. Traffic stress is a rough
measure of how comfortable a route is for bicycling or walking due to vehicular traffic along the route. The
Comprehensive Plan also establishes specific recommendations for developing and expanding alternate
modes of transportation. These recommendations are:
• Update the City’s Pedestrian and Bicycle Plan
• Focus on connecting underserved neighborhoods
• Improve the network’s safety through reduction in traffic stress wherever possible
• Improve the design of the pedestrian and bicycle network to accommodate more users
This Plan expands on the goals of the Comprehensive Plan. It uses Level of Traffic Stress analysis and a gap
analysis to identify pedestrian and bicycle projects that will reduce stress and improve safety for pedestrians
and bicyclists across the City. This is expected to increase walking and biking, especially for short trips around
Dover.
33
DOVER BICYCLE AND PEDESTRIAN PLAN ׀6
Page 34
Item 4.
Benefits of Active Transportation
As shown in the graphic below, walking and bicycling provide a multitude of low-cost benefits to the Dover
community that will improve the quality of life of residents and visitors.
Transportation
Provides travel
choices
Reduces congestion
Supports transit
Health
Equity
Supports active
Affordable
lifestyles
Convenient
Reduces obesity
Provides recreation
Walking Accessible to all ages
&
Bicycling
Economic
Environment
Supports local
Supports smart businesses
growth
Attracts new
Improves air quality businesses
Improves access to Promotes tourism
natural areas
Increases land value
Figure 2. Benefits of Walking & Bicycling
34
DOVER BICYCLE AND PEDESTRIAN PLAN ׀7
Page 35
Item 4.
Public Involvement
The Dover Bicycle and Pedestrian Plan was discussed and presented in the following public forums:
October 21, 2019 – At the initial public workshop, held at the Dover Library, information regarding existing
conditions/facilities and Level of Traffic Stress was presented to the public. Attendees were given the
opportunity, through a mapping exercise and comment forms, to identify specific pedestrian and bicycle
needs and potential improvements throughout the City. Representatives from the City, DelDOT, the MPO,
and the consultant provided staff assistance.
Figure 3. Participants at the October 21 public workshop
September 1-30, 2020 – Due to COVID-19, the second opportunity for public comment was online instead
of in-person. The draft plan and an online survey were available on the City website for the entire month of
September. Nine people submitted feedback via the survey, and their comments were incorporated in the
final plan.
35
DOVER BICYCLE AND PEDESTRIAN PLAN ׀8
Page 36
Item 4.
Accomplishments
Since 2015, the City of Dover and DelDOT have made great strides in creating a more pedestrian- and
bicycle-friendly city. Listed below are examples of some of the accomplishments that have occurred since
the previous Plan adoption:
Year Accomplishment
Ongoing • Regularly scheduled community events such as the Amish Country Bike Tour,
Bike to Work Day, and bike rodeos in community elementary schools were
conducted.
2015 • The Division Street / Forest Street Dover Capital Gateway Plan and Design Book
was completed.
• Bike maintenance classes were held through the Parks & Recreation
Department.
2016 • The Senator Bikeway study was completed.
2017 • Sidewalk requirements to the Dover Code were amended to govern sidewalks,
shared use pathways, and other hard paved trails whether or not adjacent to a
roadway as “pathways;” new pathways must be designed to accommodate
existing and future multi-modal traffic volumes; Ordinance 2017-12
• The Zoning Code was modified to allow the Planning Commission or city
planner to reduce the parking requirements for a development in an amount
not to exceed 50% when the use is adequately served by transportation and
parking alternatives; one way developers can demonstrate this is by providing
off-street parking for bicycles, where a group of five bicycle parking spaces is
equivalent to one standard parking space. (Ordinance 2017-12)
• The Schutte Park Master Plan was completed.
• The West Dover Connector (P.O.W./M.I.A. Parkway), a 3.2-mile roadway along
the west side of Dover, connecting Hazlettville Road and US 13 south of the City,
was completed. It includes bike lanes and a shared use pathway.
• The first signature Dover bike rack was installed at the Dover Public Library.
• Mayor and City Council awarded members of the Bicycle and Pedestrian
Subcommittee with certificates of appreciation at the City Council Meeting.
• Bike lanes were installed on North State Street, north of the intersection with
Walker Road (ranked second in 2015 Bike Plan).
• Dover was awarded “Bicycle-Friendly Community” status for 2017-2021 by the
League of American Bicyclists.
36
DOVER BICYCLE AND PEDESTRIAN PLAN ׀9
Page 37
Item 4.
2018 • Pedestrian crosswalks and signals were added at the intersection of North State
Street and Walker Road.
• Trails were resurfaced on North Street, Saulsbury Road, and Forrest Avenue.
• The West Street shared use pathway was completed, including an upgraded
railroad crossing and a connector to Jerusalem Way.
2019 • Phase I of the Senator Bikeway broke ground in June 2019 and was completed
in December. It includes a shared use pathway on the north side of Forrest
Road from Saulsbury Road in front of the Booker T. Washington Elementary
School to the traffic signal, becomes a protected two-way cycle track on the
north side of Division Street, over the railroad tracks, north on North West Street
for two blocks, east onto Cecil Street, across State Street, and onto an alley,
continuing along Washington Street to Silver Lake Park.
• The Bank Lane Feasibility Study was completed.
• The Delaware State University Pedestrian Study was updated.
• A shared use pathway segment was built along East Division Street between US
13 and Bayard Avenue as part of private development. The pathway continues
north along US 13 to the intersection with Kings Highway NE.
• US 13 sidewalk improvements were installed (ranked 4th in 2015 Pedestrian Plan).
• A US 13 shared use pathway was completed on the east side of the highway
between Townsend Boulevard to Leipsic Road.
2020 • The City Comprehensive Plan was published. It calls for improving the
pedestrian and bicycle network with a focus on connecting underserved
neighborhoods, improving network safety by reducing traffic stress, and
accommodating more users by improving the design of the network.
37
DOVER BICYCLE AND PEDESTRIAN PLAN ׀10
Page 38
Item 4.
Figure 2. Phase I of the Senator Bikeway, photograph courtesy Delaware State News
38
DOVER BICYCLE AND PEDESTRIAN PLAN ׀11
Page 39
Item 4.
39
DOVER BICYCLE AND PEDESTRIAN PLAN ׀12
Page 40
2. EXISTING CONDITIONS
Item 4.
40
DOVER BICYCLE AND PEDESTRIAN PLAN ׀13
Page 41
Item 4.
Land Use
The City of Dover has a diverse mixture of land uses within its 23.3 square mile area. The City, with an
estimated 2018 population of 38,079, is the second most populous municipality in Delaware. Dover is also
the largest municipality in the state in terms of land area.
Based on data provided by the City of Dover Planning Department, listed below is a breakdown of the land
uses within the City limits as of 2019. Existing land uses are also shown in Figure 5.
Land Use Category Amount
Residential 19.8%
Dover Air Force Base 17.4%
Open Space 15.9%
Commercial 10.5%
Active Agriculture 10.3%
Institutional & Public Utilities 10.1%
RESIDENTIAL
As noted in the table, the predominant land use within City limits is residential. High density residential is
located in the downtown core (roughly a 2 square mile area), while lower density, single-family residential
land use comprises the majority of the land use in the surrounding areas.
COMMERCIAL
US 13 is the primary commercial corridor for both the City and Kent County. This roadway features a wide
variety of traditional highway commercial uses, ranging from offices to restaurants to regional malls (Dover
Mall). Other corridors with a high concentration of commercial uses include Bay Road, SR 8 (west of
Saulsbury Road), and Loockerman Street in downtown Dover. Dover Downs is also an important destination
along US 13.
EDUCATIONAL
There are four universities and colleges within City limits: Delaware State University, Wilmington University,
Delaware Technical and Community College, and Wesley College. In addition, there are 11 public schools
in the City, eight of which are elementary schools. Finally, there are several private schools located in Dover.
INSTITUTIONAL
The State of Delaware owns a variety of government buildings in Dover befitting its status at the state capital,
including Legislative Hall, the State Archives, and state offices. The downtown area also houses City Hall,
the Kent County Courthouse, a new library, the regional hospital, several museums, a vibrant historic district,
and the Kent County transit hub.
OPEN SPACE/PARKS
There are 27 City-maintained parks in Dover that range from passive planted areas to community
playgrounds to larger regional parks. There are several parks that are able to provide active recreational
opportunities for large numbers of residents, including Schutte Park, Silver Lake Park, and Dover Park. In
addition, The Green was recently incorporated into the National Park System as a National Monument.
41
DOVER BICYCLE AND PEDESTRIAN PLAN ׀14
Page 42
Item 4.
Figure 3. Map showing City of Dover Land Use
42
DOVER BICYCLE AND PEDESTRIAN PLAN ׀15
Page 43
Item 4.
Figure 4. First Fridays in Dover, photograph courtesy Delaware's Quaint Villages
Figure 5. Annual Amish Country Bike Tour, courtesy Delaware State News
43
DOVER BICYCLE AND PEDESTRIAN PLAN ׀16
Page 44
Item 4.
Population & Demographics
The City of Dover has over 15,000 households comprised of over 38,000 residents. Many Dover residents rely
on walking, biking, and transit for transportation. Although only 4.3% of households have no vehicles
available, in census tracts in in the downtown area, closer to 20% of households have no vehicles available.
Households with no vehicles available correlate with a higher percentage of households below poverty
level as shown in Figures 9 and 10. With an average annual cost of car ownership exceeding $9,000, access
to affordable transportation options is critical to Dover’s low-income population and to youth and senior
populations, as shown in Figures 11 and 12, who also may not have access to a personal vehicle.
Figure 6. Map of the City of Dover
Total Population 38,079 Individuals below poverty 6,350
level (19.4%)
Total Youth Population (under 18) 7,837 Youth below poverty level 2,184
(21.1%) (under 18) (28.8%)
Total Senior Population (65+) 5,192 Seniors below poverty level 324
(14.0%) (65+) (6.6%)
Total Households 15,476
Median Household Income $49,738
Households with no vehicles 669
available (4.3%)
Average annual cost of vehicle $9,282 1
ownership
1 https://newsroom.aaa.com/auto/your-driving-costs/
44
DOVER BICYCLE AND PEDESTRIAN PLAN ׀17
Page 45
Item 4.
Figure 7. Map showing percentage of households with no vehicle available
Figure 8. Map showing percentage of population living below poverty level
45
DOVER BICYCLE AND PEDESTRIAN PLAN ׀18
Page 46
Item 4.
Figure 9. Map showing percentage of population under 18
Figure 10. Map showing percentage of population over 65
46
DOVER BICYCLE AND PEDESTRIAN PLAN ׀19
Page 47
Item 4.
Current Plans, Policies, & Programs
This document does not exist in a vacuum, but has been informed by numerous other planning documents,
as well as existing policies and programs. A summary of the plans, policies, and programs that relate to the
Dover Bicycle and Pedestrian Plan are included below.
STATE DOCUMENTS
Blueprint for A Bicycle Friendly Delaware: A Statewide Policy Plan (2018)
In 2018, DelDOT adopted the Blueprint for a Bicycle Friendly Delaware. As noted in the document, the plan
“lays out a series of innovative strategies for planning, design, coordination and communication tools” to
accomplish the following goals:
• Goal 1: Develop a complete, comfortable, connected bicycle network
• Goal 2: Improve bicyclist safety and confidence
• Goal 3: Foster a culture of bicycling that benefits all Delawareans
This is a comprehensive long-term policy plan that aims to “establish a shared vision for bicycling among a
wide range of stakeholders and then initiate, coordinate, and guide action through its implementation
strategies.” Those strategies are:
• Network Development: Creating local plans that identify the desired bicycle network
• Project Prioritization and Funding: identifying and prioritizing projects that expand the low-stress
bicycle network
• Project Development and Design Guidance: Designing and constructing facilities that extend the
bicycle network and produce a safer, more comfortable experience for bicyclists and other users.
The plan also includes a “Tool Kit” to support municipalities with local bicycle network and project planning.
Historically, bicycle projects in Delaware were often initiated at the state level in collaboration with local
partners. This plan changes the funding process by requiring a locally-driven participatory planning process
to identify projects and funding priorities. Those projects will be evaluated by the metropolitan planning
organizations (MPOs) and prioritized, and the top three to five projects will be submitted to DelDOT for
funding. The state will then make sure those projects are “cost-effective, feasible, and connected to
regional and statewide networks.”
This plan emphasizes using Level of Traffic Stress (LTS) in the evaluation of bicycle projects. Traffic stress is
defined as “a combination of perceived danger and other stressors… associated with riding a bike close to
motor traffic.” One of the most critical recommendations of the plan is to “complete bicycle LTS data
collection/refinement and integrate into GIS and bicycle travel model” and “integrate the low traffic stress
approach and data in network and system planning and evaluation.” DelDOT will score projects based on
improved low-stress access to public transportation and transit centers, employment, schools, community
centers, and existing parks and trails. The plan outlines the methodology used to evaluate LTS. Since this
plan was adopted, DelDOT has completed a statewide LTS assessment which is described on page 60.
47
DOVER BICYCLE AND PEDESTRIAN PLAN ׀20
Page 48
Item 4.
DelDOT ADA Self-Assessment and Transition Plan
DelDOT is responsible for pedestrian facilities along State-maintained roadways within the City of Dover. In
2018, DelDOT completed the ADA Self-Assessment and Transition Plan in accordance with the Americans
with Disabilities Act (ADA). The Plan includes a self-evaluation of DelDOT’s policies, services, activities, and
buildings, and an assessment of its pedestrian facilities. The purpose of the document is to outline actions
that will be taken to make transportation facilities in the public-right-of-way accessible to all individuals.
More information about the impact of this Plan on pedestrian facilities in Dover is available on page 54.
Healthy and Transit-Friendly Development Act (2016)
The Healthy and Transit‐Friendly Development Act was signed into law on May 5, 2016. The law enables
local governments and DelDOT to jointly designate “Complete Community Enterprise Districts.” Within a
designated District, the local government partner must zone and plan for mixed uses and higher density
development and relinquish counter‐productive and burdensome parking regulations. In return, DelDOT
must design streets in the District to be slow so that both walking and cycling are safe and inviting and must
also prioritize capital investments in transit, walking and cycling improvements.
First State Trails and Pathways Initiative (2012)
The First State Trails and Pathways Initiative is a program managed by the State of Delaware whose primary
goal is to “create a world-class statewide network of pathways and trails for Delaware’s citizens and visitors,
to promote biking, hiking, walking, and active living.” The Initiative is managed by a partnership of DelDOT
and the Delaware Department of Natural Resources and Environmental Control (DNREC).
The program was initiated in 2012 by Governor Jack Markell in an effort to address the following goals:
• Establish Delaware as a Top Ten Bicycle Friendly State (as designated by the League of American
Bicyclists).
• Support the creation of jobs resulting from investments in biking and walking
• Create/expand community connections
• Create healthy and active communities
• Provide safe, affordable transportation and recreational choices
• Incorporate environmentally-friendly practices into trail projects
Since the program was initiated, numerous trails and shared use pathway projects have been planned,
designed, and constructed throughout the state. Delaware has improved its ranking as a Bicycle Friendly
State by the League of American Bicyclists, jumping from a national ranking of #10 in 2012 to #3 in 2015,
ranking Delaware as the most Bicycle Friendly State east of the Mississippi River. Delaware’s rank in the
program is now #6.
The City of Dover has been a direct beneficiary of the First State Trails and Pathways Program, as evidenced
by the completion the Capital City Trail in 2014. The Capital City Trail is a shared use pathway that provides
a direct connection from Silver Lake Park to the Isaac Branch Trail (a 2.6-mile greenway that connects US
13 and SR 10, effectively implementing the Silver Lake to St. Jones project from the 2011 MPO Bicycle Plan).
The Capital City Trail was completed through a combination of widening existing sidewalks and installing
new shared use pathways to create an important walking and biking facility in the heart of downtown
Dover.
48
DOVER BICYCLE AND PEDESTRIAN PLAN ׀21
Page 49
Item 4.
DelDOT Complete Streets Policy (2010)
DelDOT is responsible for the maintenance of all State roads within City limits. These include arterial routes
such as US 13, US 13A (Governors Avenue), SR 8, SR 15, and State Street. Collector routes such as White Oak
Road, New Burton Road, and Walker Road are also maintained by DelDOT.
The City of Dover provides maintenance responsibilities for all other streets in the City. Examples of City-
maintained streets primarily include streets in the urban downtown core, such as Bradford Street and
Kirkwood Street, as well as most residential streets in developments.
In 2010, DelDOT adopted its Complete Streets Policy. As noted in the Policy, “the term Complete Street
means a roadway that accommodates all travelers, particularly public transit users, bicyclists, pedestrians,
and motorists, to enable all travelers to use the roadway safely and efficiently.” The purpose of the
Complete Streets Policy is “to ensure that DelDOT system modifications are routinely planned, designed,
constructed, operated, and maintained in a way that enables safe and efficient access for all users. The
result should be a system for all users that is comprehensive, integrated, connected, safe, and efficient
allowing users to choose among different transportation modes, both motorized and non-motorized.”
A primary objective of the Policy is “to define and implement changes to the project development process
that will value all transportation modes during the project scoping phase and enhance currently used
design practices through updates to DelDOT subdivision and design manuals, design memoranda, and
policies.”
The DelDOT Complete Streets Policy indicates that “all projects in the state right-of-way that are considered
road reconstruction, widens the pavement width, or allows for the inclusion of facilities for all users, shall
consider all transportation modes and accommodate accordingly.”
Since its adoption, DelDOT has incorporated elements of the Complete Streets Policy into several projects
in Dover, including the South Governors Avenue improvement project, which provided continuous 5-foot
sidewalks and continuous 5-foot striped bicycle lanes throughout the project limits (Water Street to Webbs
Lane). As part of the Capital City Trail project that was completed in 2014, DelDOT also widened existing
sidewalks in heavily used pedestrian areas to provide a 10-foot wide shared use pathway, enhancing
pedestrian and bike mobility in the downtown area.
As part of a recent pavement rehabilitation project along US 13 through Dover, DelDOT reduced the existing
lane widths from 12 feet to 11 feet to provide a 5-foot wide bicycle lane in accordance with the Policy. As
part of a recent pavement rehabilitation project along East Loockerman Street, DelDOT re-striped an
existing shoulder to provide a 5-foot wide bicycle lane. This improvement facilitates bicycle mobility
between downtown Dover and US 13.
In addition, DelDOT included a 10-foot-wide shared use pathway and 7-foot-wide striped bike lanes into
the design of the West Dover Connector (P.O.W./M.I.A. Parkway), a 3.2-mile-long new roadway providing
a direct connection between Saulsbury Road and US 13. This project also added sidewalks in the more
urban typical section near Rodney Village, which is just south of the City limits. The project significantly
improves bicycle and pedestrian access from the south part of Dover (as well as Brecknock Park in
Camden) to west Dover, including Schutte Park and the existing pathway along Saulsbury Road.
49
DOVER BICYCLE AND PEDESTRIAN PLAN ׀22
Page 50
Item 4.
DelDOT Statewide Pedestrian Action Plan (2007)
In 2007, DelDOT adopted the Delaware Statewide Pedestrian Action Plan. The Plan was initiated as the result
of Executive Order 83, signed by Governor Ruth Ann Minner in March 2006. Executive Order 83 required that
an Advisory Council on Pedestrian Awareness and Walkability be established to assist DelDOT in developing
and implementing a Statewide Pedestrian Action Plan. Per the Executive Order, the Plan was to address
the following issues:
• Ensuring that pathways and sidewalks are continuous and interconnected where feasible
• Developing consistent design standards for crosswalks, sidewalks, and shared use pathways
• Clarifying maintenance responsibilities for sidewalks
• Reviewing traffic rules and driver behavior to help support a safer pedestrian environment
• Promoting land use and traffic patterns that encourage walking and reduce air pollution
The adopted Delaware State Pedestrian Action Plan includes the following key components:
• Description of the importance of walking and pedestrian facilities
• Identification of issues and concerns for pedestrians
• Inventory of Federal, State, and local policies, regulations, and practices relating to pedestrians
• Recommended actions
Based on the Pedestrian Action Plan, DelDOT conducted a comprehensive sidewalk inventory in 2012 and
completed its ADA Transition Plan in 2018. In the DelDOT FY 2019 - 2024 Capital Transportation Program
(February 2019), the Department is proposing to spend $3.38 million – which will be supplemented by $13.53
million of Federal dollars – on the construction of pedestrian improvements throughout the state. Needs that
are identified in the Transition Plan and in local community plans will likely become a part of DelDOT’s
project list for design and eventual construction and/or implementation.
DelDOT Safe Routes to School Program (2002)
The Safe Routes to School (SRTS) Program is a DelDOT program whose primary purpose is to facilitate and
encourage children to walk and bike to school safely. The State program was established in 2002, and the
corresponding Federal SRTS program was initiated in 2005. Any public, private or charter schools are eligible
to participate in the program, provided the projects benefit elementary and middle school age children.
The SRTS program is divided into 5 components (the 5 Es): Engineering, Education, Enforcement,
Encouragement, and Evaluation. DelDOT works with each school in the program to develop a Safe Routes
to School Plan that incorporates each of these five elements into a comprehensive program. Examples of
eligible infrastructure and non-infrastructure costs are listed below.
Infrastructure Non-infrastructure
Sidewalk improvements Traffic education and enforcement
Traffic calming Student sessions on safety
Pedestrian signals Parent education materials
Bicycle parking Evaluation and data gathering
Five SRTS projects have been completed in the City of Dover, which consisted of improvements along routes
to two elementary schools (Booker T. Washington and Towne Point) and two middle schools (William Henry
and Central Middle) in the Capital School District, and one elementary school (W. Reily Brown) in the Caesar
Rodney School District. These improvements were completed in 2010, 2011, and 2015. The Capital School
District was one of the first school districts in the state to take advantage of SRTS funding.
50
DOVER BICYCLE AND PEDESTRIAN PLAN ׀23
Page 51
Item 4.
REGIONAL DOCUMENTS
Regional Bicycle Plan (2017)
In the fall of 2017, the Dover/Kent County MPO completed the 2017 Regional Bicycle Plan (RBP) for Kent
County. This plan is an update to the 2011 plan and uses a 20-year planning horizon, with a focus on 2017-
2037. The purpose of the plan is to review progress made under the previous RBP, identify and prioritize
recommended projects, and make recommendations for policies, ordinances, and other actions that
should be taken at the State, County, or local government level. The Regional Bicycle Plan was completed
after over a year of effort involving DelDOT, DNREC, Kent County Planning, the City of Dover and other
municipalities, and bicycle advocates throughout the county.
The MPO Regional Bicycle Plan identifies the following goals and objectives:
• Goal 1 - Create an effective and safe bicycle transportation system
o Objective 1 - Ensure that bicycle routes reach high-demand destinations such as schools,
employment centers, and parks
o Objective 2 - Maintain and improve existing bicycle facilities
• Goal II - Make bicycle riding a viable transportation option for persons of all ages in Kent County
o Objective 1 - Increase the viability of bicycling as a solution for any daily need
o Objective 2 - Create an environment where all bicyclists and motorists know and follow the
rules of the road
o Objective 3 - Promote bicycle transportation
o Objective 4 - Increase availability of bicycles
Goal 1 recommendations include regional bicycle system projects as well as criteria for project evaluation.
As Kent County’s largest urban area, the City of Dover is a primary focus of the Regional Bicycle Plan’s
recommendations. Twelve out of 22 of the identified and prioritized projects are located in the Dover area,
and the seven highest scoring projects in the plan are located in Dover. Criteria include barrier elimination,
regional and local significance, connections to recreational facilities/points of interest, multi-modal
connections, state investment strategies, and LTS reduction, which was given the highest weight by the
committee and significantly impacted project prioritization. Proposed projects located within the City of
Dover are included in this plan in the Engineering Recommendations section on page 85.
Health and Equity Analysis of City of Dover and Kent County Regional Bicycle
and Pedestrian PLANS (2016)
Through funding from the American Planning Association’s (APA) Plan4Health program, the Delaware
Chapter of the APA, the Delaware Public Health Association, and the Delaware Coalition for Healthy Eating
and Active Living (DE HEAL) sought to create an approach to integrate health and equity in planning. Using
feedback from the community, the Delaware Plan4Health team has examined opportunities to integrate
health and equity in the update of the Kent County Bicycle Plan.
With findings from health and equity analyses and information gathered from charrettes held in Dover and
Kent County, the team identified several improvements to pedestrian and bicycle networks that will
enhance connectivity to retail, grocery, public spaces, and other community assets. Many of the routes
identified are local streets in a downtown, urban environment with on‐street parking and sidewalks on both
sides of the street. The routes selected tended to be lower traffic streets. The team discussed potential
upgrades to these routes to make them a part of an identifiable “network” for bicycles and pedestrians:
• Enhanced bicycle infrastructure appropriate to their context
• Routes should be marked so that people know to use them as the safest routes to walk or bicycle
between their destinations.
51
DOVER BICYCLE AND PEDESTRIAN PLAN ׀24
Page 52
Item 4.
LOCAL DOCUMENTS
City of Dover Comprehensive Plan (2020)
The City of Dover Comprehensive Plan sets forth broad goals for community development and includes
policy recommendations in areas including natural resources and environmental protection, historic
preservation, public utilities and infrastructure, community services and facilities, transportation, economic
development, housing & community development, land development, growth and annexation, and
intergovernmental coordination. The Comprehensive Plan is a legally binding document that essentially
serves as the constitution for the City.
The Transportation Plan section describes conditions for walking and bicycling in Dover, explaining that the
transportation network has improved thanks to the gradual implementation of the 2015 Pedestrian and
Bicycle Plans. The Comprehensive Plan describes Level of Traffic Stress analysis as a useful tool to target
investments in bicycle and pedestrian improvements to improve safety and encourage greater use. Traffic
stress is a rough measure of how comfortable a route is for bicycling or walking due to vehicular traffic along
the route. The Comprehensive Plan also establishes specific recommendations for developing and
expanding alternate modes of transportation. These recommendations are:
• Update the City’s Pedestrian and Bicycle Plan
• Focus on connecting underserved neighborhoods
• Improve the network’s safety through reduction in traffic stress wherever possible
• Improve the design of the pedestrian and bicycle network to accommodate more users
City of Dover Code of Ordinances
The City of Dover’s Code of Ordinances includes numerous requirements to make the Cit8y better for
walking and bicycling. The City requires developers to provide safe and convenient multi-modal access for
all new major subdivisions. The Code refers to sidewalks, shared use pathways, and other hard paved trails,
whether adjacent to the roadway or not as “pathways,” and provides design standards, which refer to
material, width, and general location. In addition, the Code requires property owners to maintain sidewalk
that is adjacent to their property
The Code also has several references to bicycle amenities that are required as part of large-scale
development projects. As noted in the Code, “bicycle parking shall be provided for parking spaces at a
rate of one bicycle parking space for every 20 vehicular parking spaces.”
In an effort to enhance and promote walkable communities and bicycle-friendly communities, the City has
two additional categories that provide developers with flexibility and incentives to address pedestrian and
biking needs through land use design. The categories are the Corridor Overlay Zone and Traditional
Neighborhood Design (TND), a zoning designation.
The City of Dover has established a Corridor Overlay Zone along two roads in the northwestern part of the
City:
• SR 8 (Railroad tracks to western City limits)
• McKee Road/Saulsbury Road (Denneys Road to North Street)
The Corridor Overlay Zone has several primary purposes:
• Promote superior urban design (includes “transportation amenities for bicycles, pedestrians, and
transit that exceed those required by the zoning ordinance”)
• Foster connections among adjacent properties
• Preserve the function and efficiency of the roadway
• Achieve a balanced streetscape which is friendly to the pedestrian and motorist alike
As stated in the Code,
52
DOVER BICYCLE AND PEDESTRIAN PLAN ׀25
Page 53
Item 4.
“The intent of the TND zone is to create a walkable and pedestrian-friendly, economically
viable professional, commercial and mixed-use residential neighborhood for people of
different ages and incomes that draw from the best architectural and community design
features of Delaware and the Delmarva Peninsula from its colonial past to the mid-20th
century. Its intent is also to preserve and enhance the natural landscape, celebrate the
history of the site, and buffer the development from adverse external influences. The
provisions of this section are intended to encourage greater integration of land-uses and
diversity of lot sizes than is permitted under other provisions of the Land Subdivision Regulations
and Zoning Ordinance of the City of Dover. Lastly, it may provide locations for other uses that
will aid in the fulfillment of the City of Dover's Comprehensive Plan and allow people to live
near their work.”
“The TND shall have a pedestrian walkway and/or bicycle system through the open spaces
that connect to the street system or connects a series of open spaces. Bicycle parking and
locking facilities should be provided in public spaces as appropriate.”
“The design of streets shall form a connected system with dimensions and speeds reasonable
to serve the development, but also to create an environment that is friendly to pedestrians
and bicycle riders.”
One of the first communities being developed under the TND zoning category is the Eden Hill Farm, a 265-
acre mixed use development along North Street. The community, which is currently under construction,
provides a mixture of commercial, residential, institutional, and open space located in close proximity to
each other. The land use, combined with wide sidewalks, interconnections, and an internal trail network,
creates a true walkable new community in the heart of Dover.
City of Dover Pedestrian Plan (2015)
The City of Dover Pedestrian Plan was adopted in 2015. The Plan details existing conditions, areas of
opportunity, and pedestrian needs as they relate to walking in Dover and sets forth specific goals for the
pedestrian transportation network. The Plan presents a series of recommendations categorized as new
sidewalks and trails, pedestrian signals, maintenance, and signing, striping, lighting, and fencing designed
to make the City of Dover more pedestrian friendly. Proposed projects that are located within the City of
Dover are included in this plan in the Engineering Recommendations section on page 85.
City of Dover Bicycle Plan (2015)
The City of Dover Bicycle Plan was adopted in 2015. The Plan details existing conditions, planned projects,
and areas of opportunity as they relate to bicycling in Dover and sets forth specific goals for the bicycle
transportation network. The plan also provides guidance on bicycle facility design and low-stress bicycling
and connectivity. The Plan presents a series of recommendations categorized as engineering, education,
encouragement, enforcement, and evaluation. Engineering recommendations focus on a detailed
analysis and proposal for the Senator Bikeway, an east-west route that connects Saulsbury Road with US 13
through Downtown Dover, but also included other on and off-road projects. Proposed projects that are
located within the City of Dover are included in this plan in the Engineering Recommendations section on
page 85.
53
DOVER BICYCLE AND PEDESTRIAN PLAN ׀26
Page 54
Item 4.
AREA-SPECIFIC DOCUMENTS
US 13 Pedestrian Safety Study (2020)
The study area extends from Scarborough Road in the north to Puncheon Run Connector in the south, a
5.5-mile Urban Minor Arterial. The study scope includes:
• Review pedestrian crash history
• Observe and collect pedestrian, transit, and traffic data
• Gather adjacent land use data
• Evaluate pedestrian safety along corridor and identify recommendations
Recommended improvements are included in the following table:
Table 1. US 13 Pedestrian Safety Study Improvement Recommendations
Responsible
Location Timeframe Recommendations
Party
Short-Term Install 40 mph speed limit sign on US 13 between Rustic Lane and N. DelDOT
State Street, lowering the posted speed limit from 45 mph to 40 mph Traffic
Short-Term Install Turning Vehicle Yield to Pedestrian signs at appropriate signalized DelDOT
intersections along US 13 Traffic
Mid-Term Through capital, PAR, Pave & Rehab, Traffic, and developer projects, DelDOT
add additional signalized pedestrian crossings of US 13 at existing
intersections where signalized pedestrian crossings do not exist or
where a second crossing of US 13 does not exist
Mid-Term As part of future Pave & Rehab projects, implement lane width DelDOT
reductions throughout the corridor to effectively reduce vehicular Traffic
speeds
Mid-Term Install lighting at all bus stops along corridor that currently are unlit DelDOT/DTC
Mid-Term Install median barrier treatments along these identified “priority DelDOT
segments” of US 13: Traffic
• Rustic Lane to North Dover Mall Entrance
• College Road to Leipsic Road/N. State Street
Corridor
• Centre Drive to White Oak Road
Wide
• Loockerman Street to MLK Boulevard (see US 13 at Bay Road
recommendations)
Mid-Term/ Through capital, PAR, Pave & Rehab, Traffic, and developer projects, DelDOT
Long-Term continue to close gaps in sidewalks/sidepaths along the US 13 corridor
Mid-Term/ Coordinate with DTC to improve access to transit along US 13, including DelDOT/DTC
Long-Term improvements to existing stops, providing new stops with appropriate
bus pull offs, and providing pedestrian infrastructure where none exists
today to support future transit service
Mid-Term/ Monitor crashes along other sections of US 13 (i.e., locations not DelDOT
Long-Term identified above as “priority segments”) to consider installation of Traffic
barrier treatments
Long-Term Begin high-level conceptual layout of a road re-configuration to DelDOT
identify any geometric design concerns and, upon completion of other
pedestrian safety improvements, re-evaluate pedestrian crashes to
determine if a road re-configuration would provide additional
pedestrian safety benefits
54
DOVER BICYCLE AND PEDESTRIAN PLAN ׀27
Page 55
Item 4.
Responsible
Location Timeframe Recommendations (continued)
Party
Short-Term Install pedestrian accommodations on the north and south legs and DelDOT
remove diagonal pedestrian crossing of US 13, including: Traffic
• Installation of two-stage pedestrian crossings
• Maintain concurrent side-street left-turn phasing
US 13 at • Extend the south leg median to provide pedestrian refuge
Rustic Lane • Adjust northbound and southbound stop bars to accommodate new
crosswalks
• Realign NB/SB left-turn lanes to remove offset lefts and provide
adequate median refuge islands
Short-Term Install a bench at the NB US 13 bus stop DTC
US 13 Mid-Term Install a signalized pedestrian crossing of US 13 at the existing median DelDOT
between opening at DSP Headquarters. Signalization should include FRA phasing Traffic
Rustic Lane for the SB LT/UT and consider a two-stage crossing
and North Long-Term Install median barrier between signalized pedestrian crossings from DelDOT
Dover Mall Rustic Lane to North Dover Mall Traffic
Short-Term Install a bench at the SB US 13 bus stop DTC
US 13 at Best Mid-Term Install pedestrian accommodations on the north and south legs of the DelDOT
Buy/DSU intersection. Consider two-stage crossings with median nose extensions Traffic
for median refuge areas by removing offset left-turns.
US 13 Mid-Term As part of a median barrier project (see Corridor Wide DelDOT
between recommendations), close the existing unsignalized median opening Traffic
College between College Road and N. State Street/Leipsic Road
Road and N.
State Street/
Leipsic Road
Short-Term Reconstruct traffic signal to signalize northbound US 13 and install a DelDOT
signalized pedestrian crossing across US 13 at the intersection. Provide Traffic
US 13 at ADA compliant curb ramps as part of the project. Complete
Lepore Road improvements in conjunction with previously recommended FRA left-
turn
phasing
Short-Term Install new traffic signal at the existing unsignalized Centre at Dover DelDOT
entrance as follows: Traffic
• Maintain the existing SB U-turn only configuration
• Install a two-stage signalized pedestrian crossing on the south side of
the intersection, crossing US 13
US 13 • Utilize FRA phasing for the SB U-turn movement
between Mid-Term Implement signal phasing adjustments at the existing Centre Drive DelDOT
Centre Drive signalized intersection if future shopping center vacancies are filled Traffic
and White and traffic volumes increase. Improvements should include:
Oak Road • FRA phasing for US 13 left-turns
• Removal of channelizing island to permit WB lefts from the shopping
center
Long-Term Coordinate with Dover Center shopping center owner to discuss DelDOT
removal of the redundant NB right-turn at the existing Centre Drive Traffic
signalized intersection and construct a bus pull-off in this area
55
DOVER BICYCLE AND PEDESTRIAN PLAN ׀28
Page 56
Item 4.
Responsible
Location Timeframe Recommendations (continued)
Party
Short-Term Install Turning Vehicles Yield to Pedestrian (R10-15) signs on NB and SB DelDOT
US 13 at the intersection with White Oak Rd/Kings Hwy NE Traffic
Mid-Term Install two-stage pedestrian crossings on the north and south legs of the DelDOT
US 13 at
intersection. Improvements should include: Traffic
White Oak
• Remove channelizing islands in median adjacent to left-turn lanes
Road/ Kings
• Extend median noses to provide a pedestrian refuge area
Highway NE
• Tighten radii on the NW, SW and SE corners to provide a 5-ft minimum
PAR and realign crosswalks closer to US 13 for improved pedestrian sight
distance
Mid-Term Install pedestrian accommodations on the south leg of US 13 at DelDOT
US 13 Loockerman Street Traffic
between Mid-Term Install an improved ADA compliant PAR along the Frontage Road DelDOT
Loockerman adjacent to US 13 NB between Loockerman Street and Bay Road Traffic
Street and Mid-Term Install pedestrian accommodations on the north leg of Bay Road at the DelDOT
MLK intersection with S. Little Creek Road Traffic
Boulevard Mid-Term Install pedestrian median barrier/fencing along the median of US 13 DelDOT
and adjacent to the sidewalk on southbound US 13 Traffic
US 13 at Short-Term Install pedestrian accommodations, including median and island work, DelDOT
Roosevelt on the east and south legs of the intersection and install bus stops north Traffic
Avenue and south of the intersection.
Mid-Term Develop traffic-only project to add pedestrian crossings on all four legs, DelDOT
US 13 at S.
remove offset turns and remove unnecessary channelization islands. If Traffic
State Street
impacts are too extensive, the project will become a capital project
56
DOVER BICYCLE AND PEDESTRIAN PLAN ׀29
Page 57
Item 4.
Delaware State University Pedestrian Study (2019)
In the winter of 2019, the MPO conducted a study of pedestrian volumes along US 13 and College Road
around the campus of Delaware State University. The university is located on the west side of US 13, across
from significant pedestrian attractors such as the Dover Mall, Dover Downs, several shopping centers, and
numerous restaurants. In addition, the University Courtyard apartment complex is located on College Road,
approximately 1/4 mile west of the main campus, and generates significant pedestrian volumes. In the
summer of 2013, the university acquired the former Sheraton Hotel approximately 2/3 mile north of the main
campus. The former Sheraton is now known as the DSU Commons, serving as a residential hall for 250
students as well as an early college education program for high school students. Traffic counts were
completed in 2013, 2014, and again in 2018 in support of this study.
There were several purposes of the study:
• To determine if the completed pedestrian improvements influenced behavior
• To identify additional areas of concern
• To determine compliance with existing crosswalks
• To identify pedestrian needs and determine potential solutions
Listed below is a graphic that summarizes the pedestrian volumes as well as the crosswalk compliance,
based on weekday and weekend counts that were taken at nine locations in November 2019.
SATURDAY 11/17/18 TUESDAY 11/27/18
Location 9:00 am – 3:00 pm – 9:00 am – 3:00 pm –
2:00 pm 6:00 pm 2:00 pm 6:00 pm
1. DSU Commons 20 20 19 21
Within Crosswalk 20 (100%) 9 (54%) 16 (84.2%) 8 (38.1%)
Outside Crosswalk 0 (0%) 11 (55%) 3 (15.8%) 13 (61.9%)
2. Rustic Lane 69 50 49 40
Within Crosswalk 68 (98.6%) 48 (96%) 44 (89.8%) 31 (77.5%)
Outside Crosswalk 1 (1.4%) 2 (4%) 5 (10.2%) 9 (22.5%)
3. North Dover Mall Entrance 37 37 42 19
Within Crosswalk 34 (91.9%) 34 (91.9%) 39 (92.9%) 19 (100%)
Outside Crosswalk 3 (8.1%) 3 (8.1%) 3 (7.1%) 0 (0%)
4. South Dover Mall Entrance 46 44 51 30
Within Crosswalk 34 (73.9%) 38 (86.4%) 47 (92.2%) 26 (86.7%)
Outside Crosswalk 12 (26.1%) 6 (13.6%) 4 (7.8%) 4 (13.3%)
5. DSU Entrance 59 138 82 43
Within Crosswalk 58 (98.3%) 130 (94.2%) 78 (95.1%) 38 (88.4%)
Outside Crosswalk 1 (1.7%) 8 (5.8%) 4 (4.9%) 5 (11.6%)
6. Dover Downs Entrance 61 76 25 44
Within Crosswalk 59 (96.7%) 75 (98.7%) 22 (88%) 40 (90.9%)
Outside Crosswalk 2 (3.3%) 1 (1.3%) 3 (12%) 4 (9.1%)
7. College Rd & US 13 40 18 26 21
Within Crosswalk 34 (85%) 17 (94.4%) 19 (73.1%) 19 (90.5%)
Outside Crosswalk 6 (15%) 1 (5.6%) 7 (26.9%) 2 (9.5%)
8. College Rd at Old College Rd 65 73 599 334
Within Crosswalk 41 (63.1%) 53 (72.6%) 275 (45.9%) 118 (35.3%)
Outside Crosswalk 24 (36.9%) 20 (27.4%) 324 (54.1%) 216 (64.7%)
9. Jason Court 31 33 160 71
Within Crosswalk 7 (22.6%) 6 (18.2%) 15 (9.4%) 4 (5.6%)
Outside Crosswalk 24 (77.4%) 27 (81.8%) 145 (90.6%) 67 (94.4%)
As noted in the graphic, the highest number of pedestrian crossings were recorded along College Road,
between the University Courtyard apartments and the main campus. During the two-day count period in
57
DOVER BICYCLE AND PEDESTRIAN PLAN ׀30
Page 58
Item 4.
November 2019, there were over 1,000 pedestrians that crossed College Road in this area. There were also
over 300 pedestrians that crossed US 13 at the main entrance to the university during the count period.
As part of the pedestrian study, counters observed whether pedestrians were using the striped crosswalks
or were crossing mid-block (outside of the designated crossing). From the study, the following conclusions
can be drawn:
• Pedestrians crossing at DSU Commons used the crosswalk 60% of the time during weekdays and
72.5% during weekends.
• Pedestrians crossing College Road from the University Courtyard apartments to the main campus
used the crosswalk 42% of the time during weekdays and 68% during weekends.
• As described below, several recommended improvements resulted from the study.
DSU Commons - An option is to explore the opportunity to provide a trail connection to DSU’s campus west
of US 13 behind the frontage properties, which may reduce the need to walk/ride along US 13.
US 13 and College Road - While additional signage on US 13 may be considered to urge pedestrians to cross
at the crosswalk (i.e. “CROSS ONLY AT CROSS WALK” (R9-2) and “USE CROSSWALK” (R9-3bP) signs) no further
pedestrian safety/traffic control recommendations are necessary for this location. A shared use pathway
adjacent to US 13 and into the DSU campus may be considered for implementation at and around the
studied intersection as a result of the high observed bicycle volumes. Further investigation would be
necessary to determine the limits of a proposed shared use pathway along US 13.
College Road at Old College Road - A mid-block pedestrian crossing across College Road should be
investigated between this study location and the study location to the south, at Jason Court. This evaluation
should take into consideration the appropriateness of an activated crossing, utilizing Rectangular Rapid
Flashing Beacon (RRFB) activation or other active or enhanced treatments. The proposed crossing shall offer
a safe pathway across College Road, as there is no marked crossing south of Jason Court.
Dover High School Pedestrian Study (2013)
In the spring of 2013, the MPO conducted a study to evaluate the pedestrian needs associated with the
construction of the new Dover High School. The new school, which opened in August 2014, is located along
SR 8 near the western limits of the City of Dover. It is located in a former agricultural area that has
experienced significant residential growth in recent years. SR 8 is the primary east-west route in Dover,
providing access to and from Maryland as well as facilitating local travel throughout the central Delaware
region. SR 8 currently has average traffic volumes that exceed 18,000 vehicles per day and has a relatively
large percentage of commercial vehicles.
In accordance with Department of Education requirements, students that live within a two-mile walking
radius of a high school are not required to be bussed, unless there is not a continuously safe way for them
to walk to school. The purpose of the pedestrian study was to identify the sidewalk gaps and pedestrian
needs within the two-mile walking radius, develop conceptual plans and cost estimates for these areas,
and identify potential constraints (environmental, drainage, utilities, right-of-way, etc.).
The study evaluated four primary roads that are located within the two-mile walking radius – SR 8, Kenton
Road, Mifflin Road, and Hazlettville Road. Listed below is a summary of the study recommendations for each
road.
58
DOVER BICYCLE AND PEDESTRIAN PLAN ׀31
Page 59
Item 4.
SR 8 - As part of the construction of the new high school,
the school district provided a 10-foot wide shared use
pathway along its frontage. The pathway also goes to the
rear of several existing residential properties. However,
there were significant sidewalk gaps on both the north
and south sides of SR 8 east of the new school. As a result
of the study, DelDOT initiated a design project to install
approximately 1,500 feet of new sidewalk on the north
side of SR 8, between the Cranberry Run and East
Heatherfield communities. The sidewalk was constructed Figure 11. HAWK Signal at SR 8 and Heatherfield Way
in the summer of 2014.
In addition, as part of the new sidewalk project, DelDOT installed a High-Intensity Activated Crosswalk
(HAWK) signal at the intersection of SR 8, Heatherfield Way, and the east entrance to the high school as
shown below in Figure 13. The HAWK signal is a traffic signal that turns to red upon activation by a pedestrian.
The signal stays dark unless activated. The HAWK signal pro-vides a safe signalized crossing for pedestrians
crossing SR 8 to the high school.
Kenton Road - The Dover High School Pedestrian Study evaluated Kenton Road between Walker Road and
SR 8, within the two-mile walking radius of the new high school. Kenton Road is a two-lane roadway that
carries over 10,000 vehicles per day. The land use along the roadway is primarily higher-density residential,
with the Greentree Shopping Center located at the southern end. The YMCA swim club is also located at
the intersection of Kenton Road and Walker Road. Currently, sidewalks are present along about 35% of the
corridor. The study developed a concept plan and a cost estimate for providing continuous sidewalks along
both sides of the roadway. Based on the recommendations of the study, DelDOT placed the Kenton Road
project in the FY 2015- 2020 Capital Transportation Program (CTP). The project will add continuous sidewalks
along Kenton Road from SR 8 to Chestnut Grove Road, a distance of 1.2 miles. As of March 2020, final
construction plans are scheduled for spring 2021 with construction beginning in spring 2022.
Mifflin Road - Mifflin Road, a two-lane road between SR 8 and North Street, provides access for over 15,000
vehicles per day. Except for a bank on the southeast corner of SR 8 and Mifflin Road, the land use along
the roadway is exclusively residential. The only sidewalk along Mifflin Road is located at the bank and a
small section at the North Street intersection. A concrete pathway runs east to west and ties into Mifflin
Road, providing pedestrian access from The Village of Westover to Mifflin Road. The Dover High School
Pedestrian Study identified the potential for significant property, drainage, and utility impacts associated
with the installation of sidewalks along Mifflin Road. Sidewalks along this road are currently not part of the
DelDOT Capital Transportation Program, and currently there is no design funding is allocated.
Hazlettville Road - Hazlettville Road is a two-lane road south of the new high school. The existing land use is
primarily comprised of single-family and high-density
residential units. Schutte Park is located on the south side
of the road. There is existing sidewalk along the majority of
the north side of Hazlettville Road, with the exception of
four homes near Mifflin Road. There is also a shared use
pathway along Schutte Park. Along the frontage of the
Nottingham Meadows community, there is a gap in the
sidewalk as it approaches Wyoming Mill Road shown
Figure 12. Sidewalk gap on Hazlettville Road at
below in Figure 14 (see photo). The new developer of the Nottingham Meadows
community is required to install the missing sidewalk, ensuring a continuous sidewalk along the south side of
Hazlettville Road. There are no other plans at this time to install any additional sidewalk along Hazlettville
Road near its intersection with Mifflin Road.
59
DOVER BICYCLE AND PEDESTRIAN PLAN ׀32
Page 60
Item 4.
Dover Transit Center Neighborhood Plan (2011)
In March 2011, following a design charrette process conducted the previous year, the MPO completed the
Dover Transit Center Neighborhood Plan. The purpose of the Plan, developed cooperatively with the
Downtown Dover Partnership (DDP), was “to provide the City of Dover with a design and planning strategy
for development around the new transit center. The plan also offers strategies to improve all modes of
transport throughout downtown Dover.”
The focal point of the study was the Dover Transit Center, located along Queen Street, Water Street, and
West Street. The study area included a 16-block area, as shown in Figure 15 below.
The study had the following key goals:
• Improve the gateway entrances to the downtown area with building and improved streetscapes
• Centralize parking in locations that encourage redevelopment and maintain streetscapes
• Develop Queen, Water, and North Streets as improved corridors for vehicles and pedestrians
• Encourage new development that complements the existing historical architecture of Dover
• Create a network of civic squares, open spaces, and public gathering places to provide greater
connectivity
• Use the transit center as an anchor for mixed use redevelopment and intermodal forms of
transportation
The study specifically evaluated potential land use and transportation opportunities along Queen Street,
Water Street, and North Street. With regards to the pedestrian environment, the study recommended that
“the pedestrian experience should be enhanced by improving sidewalks, providing landscaping buffering
and/or removing existing surface parking lots, and adding pedestrian scale street lighting to improve
comfort and safety.” Parts of this have recently been accomplished with the completion of Phase I of the
North Street streetscape project in 2013. An artist’s rendering showing an example of potential
improvements is shown in Figure 16.
Implementation strategy (pedestrian related):
• Provide streetscape and signage improvements at key gateways
• Work with the City and DelDOT to improve crossings and to provide pedestrian-activated
crosswalks at key intersections
• Focus road improvements on Queen Street, Governors Avenue, Bank Lane, Water Street, and
North Street
• Promote the use of the St. Jones River (riverwalk, activity areas)
• Construct streetscape enhancements along North Street and Water Street
Figure 13. Dover Transit Center study area Figure 14. Rendering of proposed North Street Gateway
60
DOVER BICYCLE AND PEDESTRIAN PLAN ׀33
Page 61
Item 4.
The Transportation Network
The transportation network within the City of Dover is regulated by three major organizations: the City of
Dover, DelDOT, and the Dover/Kent County MPO.
Dover owns and maintains approximately 111 miles of streets and alleys throughout the City limits. Most of
these streets and alleys are residential in nature and include enclosed drainage systems as well as curbs
and sidewalks.
There are an additional 60 miles of roads within the City limits that are maintained by DelDOT. These streets,
unlike the city-maintained neighborhood streets, are typically commercial in nature and move the highest
amounts of traffic within the City. DelDOT controls and plans for access to these main roads, coordinating
with the City through the Development Advisory Committee to ensure new developments are designed
with safe entrances and exits. New entrances and exits from State roads in Dover differ considerably from
older ones, as DelDOT’s standards have changed over time. DelDOT works to maintain the overall health of
the roadway system by designing and constructing its own upgrades to State roads where necessary.
Several different types of facilities accommodate bicycling and walking as travel modes within the City.
Separated (i.e. outside the curb) bicycle facilities include roadside shared use paths as well as greenways
with their own separate rights of way. Non-separated (i.e. inside the curb) bicycle facilities include bike
lanes, paved shoulders, and marked bike routes. Pedestrians are accommodated principally via the City’s
sidewalk network, though they can also use shared use pathways and greenways. In general, the City’s
pedestrian and bicycle network has become better connected since 2008, due to gradual
implementation of the City’s 2015 City of Dover Bicycle Plan and 2015 City of Dover Pedestrian Plan, as
well as Kent County’s Regional Bicycle Plan, which was updated in 2017. Implementation has come about
through the efforts of DelDOT, the MPO, Dover’s Bicycle and Pedestrian Subcommittee, and City
agencies.
Figure 15. Sharrows on W. Loockerman Street in Downtown Dover, courtesy Delaware State News
MAINTENANCE
Maintenance-related issues are one of the primary goals to be addressed by the Dover Bicycle and
Pedestrian Plan.
61
DOVER BICYCLE AND PEDESTRIAN PLAN ׀34
Page 62
Item 4.
There are three different entities that play a role in the maintenance of pedestrian facilities: DelDOT, the
City, and private property owners. Listed below is a synopsis of the existing maintenance responsibilities of
each entity, based on current policies and procedures.
DelDOT Responsibilities
In accordance with a long-standing municipal agreement between DelDOT and the City of Dover, DelDOT
provides maintenance on state roads from curb to curb. The City is responsible for maintenance on any
transportation facilities beyond the curb line. This includes sidewalks and shared use pathways.
DelDOT adopted its Sidewalk and Multi-Use Path Maintenance Policy in 2013. As stated in the Policy, DelDOT
does not maintain sidewalks owned or maintained by municipalities, sidewalks located in subdivisions,
privately-owned sidewalks, or sidewalks maintained by others through a written agreement. With regards to
snow removal on sidewalks and shared use pathways, the Policy specifies the following:
• In conjunction with established priorities for snow removal on roadways, snow removal for sidewalks
and shared use pathways will commence immediately after completion of roads classified as
“local” and “subdivision”
• Sidewalks and shared use pathways will be prioritized based on pedestrian traffic, high densities of
elderly and disabled, schools, transit routes, and other high-volume pedestrian facilities
Maintenance of any bicycle facilities within the curb limits of the State’s right of way, including re-striping of
bike lanes, debris removal, resurfacing, etc., is DelDOT’s responsibility.
It was noted by the Bicycle and Pedestrian Subcommittee that during heavy snowfall events snowplow
operators tend to pile up compacted snow at the corners of intersections. This creates problems for
pedestrians, particularly those who may be disabled. The Bicycle and Pedestrian Subcommittee has
encouraged DelDOT and the City’s Public Works Department to clear those areas as quickly as possible
following a significant snowfall.
As stated in the Policy, “all other maintenance, such as sweeping and trash removal, will be performed as
resources are available within the Department.” With regards to street sweeping, in August 2014, DelDOT
submitted its final Stormwater Management Plan for DNREC and Environmental Protection Agency review.
The sweeping plan was required to be a science-based strategy targeting pollutant removal from state-
owned roads before it enters the storm sewer system, and ultimately into rivers, lakes, and streams. The
targeted approach means that DelDOT is focusing on roads that have direct connections to the storm
sewer system in areas that have the greatest potential to produce harmful pollutants (i.e. high traffic,
commercial, industrial, residential). Each of these road types is swept at a frequency that acknowledges
the availability of DelDOT resources (manpower, equipment, budget) while meeting the terms of the
National Pollutant Discharge Elimination System (NPDES) permit, which is to effectively prohibit the discharge
of material other than stormwater. Interstates, expressways, and principal arterials are swept a minimum of
four times per year, Major and minor collector roads are swept at minimum twice a year, and local roads
are swept at minimum once a year. Sweeper vehicles are equipped with automatic vehicle location (AVL)
devices to help verify that the required sweeping frequency has been met.
62
DOVER BICYCLE AND PEDESTRIAN PLAN ׀35
Page 63
Item 4.
City of Dover Responsibilities
The Dover Code of Ordinances contains several references to the maintenance responsibilities for
sidewalks. The 2015 Pedestrian Plan recommended that the term “shared use facility” be added to any
sidewalk maintenance reference in the City’s Code. Although in 2017 the “Sidewalk requirements” section
of the Code was updated to read “Pedestrian, bicycle, and multi-modal access requirements,” this section
does not refer to sidewalk maintenance.
The City currently provides maintenance on pathways located within the City’s park system, such as the
trails within Schutte Park and Silver Lake Park. In addition, the City is currently providing maintenance on the
US 13 portion of the Capital City Trail, between the Thomas Collins Building and MLK Boulevard and along
Park Drive.
Property Owner Responsibilities
The Dover Code of Ordinances contains several references to the maintenance responsibilities of property
owners adjacent to sidewalks. The Code of Ordinances reference is noted below, with the ordinance
wording quoted.
Article I, Sec. 98-5 : “It shall be unlawful for the owner or occupant of any premises abutting
upon a sidewalk to permit or allow snow or ice to remain thereon for longer than 12 hours of
daylight after it has ceased snowing, or to permit debris or other materials to accumulate at
any time so that pedestrians may conveniently and safely pass.”
Article I, Sec. 98-6: “All persons occupying commercial establishments or premises fronting on
any street or public place shall keep the sidewalk immediately in front of their premises clear
of debris or other materials so that pedestrians may conveniently pass…”
Article I, Sec. 114-2(h): “All large or established trees shall be pruned to the following sufficient
heights to allow the free passage of pedestrians - 8 feet over sidewalk.”
Article II, Sec. 28A: “The city council, at such time as it shall determine that the condition of a
particular street or portion thereof, requires that sidewalks be laid, or that the sidewalks then
existing...should be improved, or upon the petition of a majority of persons owning property
along any of the streets...asking that the sidewalks abutting on said street be improved, or
that sidewalks be laid where there are none at the time of the petition, may direct the
property owner or owners to lay or replace sidewalks with such materials, as in the judgment
of the said council...may seem best under the circumstances. It shall be the duty of the city
manager to give at least 15 days’ notice in writing to the owner or owners of said property
affected by the action of the said council. It shall be the duty of the owner or owners, after
notice shall have been given...to forthwith cause the said sidewalks to be laid or the
improvement or alterations thereof to be made, as directed in said notice. Upon the failure
of the owner or owners to lay or cause to be laid or improved or altered, the
sidewalks...according to the direction of said notice, it shall be the duty of the city manager
to cause the said sidewalks to be laid or altered or improved...according to the terms of such
notice.”
Article VII.B.4(b): “If a homeowners association is formed...the organization shall be
responsible for maintenance on...all open public facilities...including sidewalk…”
63
DOVER BICYCLE AND PEDESTRIAN PLAN ׀36
Page 64
Item 4.
In practice, the City’s Public Works Department repairs and reconstructs sidewalks as financial and
personnel resources allow. An adjacent property owner is not responsible for making structural repairs to an
existing sidewalk, based on current practice. Adjacent property owners are required to adhere to the
regulations regarding snow removal, vegetation clearing, and debris removal. The City does issue citations
for violations, in accordance with the Code of Ordinances.
Currently, the Code of Ordinances only refers to sidewalks. It is recommended that the Code be amended
to include a reference to “shared use path,” in addition to any sidewalk maintenance reference. This would
require approval by the City Council.
Adopt-A-Bike Path Program
DelDOT has a program that enables volunteers to “adopt” a
state-owned bike pathway. Initiated in 2004, the Program is a
partnership between DelDOT and volunteers to care for a
designated bike pathway a minimum of three times a year.
Volunteers remove debris, trash, etc. in an effort to make the
bike pathway safer for cyclists, as well as keeping the bike
pathway and surrounding area cleaner. Currently, there are no
bike pathways that have been “adopted” in the City of Dover.
Figure 16. Ribbon cutting at the West Street Trail at the Dover Transit Center, courtesy Bike Delaware
64
DOVER BICYCLE AND PEDESTRIAN PLAN ׀37
Page 65
Item 4.
PEDESTRIAN FACILITIES
As part of the update to the Pedestrian Plan, an inventory of existing pedestrian facilities within City limits
was conducted. The inventory evaluated the following components:
• Off-road trails and shared use pathways
• Sidewalks
• Pedestrian signals and crosswalks
• Pedestrian generators and attractors
Figure 19 displays the results of the inventory. Listed below is a summary of the key findings from the
pedestrian facility inventory:
• There are approximately 15 centerline miles of off-road trails and shared use pathways within the
City, 6 additional miles since the last inventory in 2015
• There are 87 traffic signals within City limits; eleven of these traffic signals (14%) do not have
pedestrian signals and/or crosswalks; these signals are listed below and are mapped in Figure 19
• The City has numerous areas of potentially high pedestrian use, based on adjacent land use,
population density, and proximity to pedestrian attractors/generators
Signalized Intersections Without Pedestrian Signals
• US 13/Scarborough Road
• US 13/Delaware State University Commons
• US 13/Bay Road
• US 13/Roosevelt Avenue
• US 13/South State Street
• US 13/Puncheon Run Connector
• South State Street/Webbs Lane
• Kenton Road/Walker Road
• Kenton Road/College Road
• Kenton Road/Denneys Road
• McKee Road/Denneys Road
Through the development of this Plan update, with input from the City of Dover and the public, the below
areas have been identified as impediments to safe pedestrian travel in the City:
• Washington Street and State Street (across State Street)
• Division Street: sidewalks are too narrow and in poor condition, and crosswalks are worn off,
especially unsafe at the Loockerman Street merge
• Mifflin Road
• Water Street and New Street: no sidewalks present
• US 13
65
DOVER BICYCLE AND PEDESTRIAN PLAN ׀38
Page 66
Item 4.
Figure 17. Map showing pedestrian facilities
66
DOVER BICYCLE AND PEDESTRIAN PLAN ׀39
Page 67
Item 4.
BICYCLE FACILITIES
As part of the update to the Bicycle Plan, an inventory of existing bicycle facilities within City limits was
conducted. The inventory evaluated the following components:
• Off-road trails and shared use pathways
• On-road designated bicycle lanes
• Bicycle parking (racks)
• Sharrow locations
Listed below is a summary of the key findings from the bicycle inventory, illustrated in Figure 20:
• There are approximately 15 centerline miles of off-road trails and shared use pathways within the
City, 6 additional miles since the last inventory in 2015
• There are approximately 22 miles of designated on-road bicycle lanes within the City, 13 additional
miles since the last inventory in 2015
• There are approximately 600 bicycle parking spaces within the City; with the exception of eight
bicycle lockers located on the DelDOT campus, all of the bicycle parking spaces consist of bicycle
racks
• There are approximately 1.9 roadway miles with sharrows
Despite the accomplishments that have been made in recent years to enhance the bicycling network and
improve connectivity in the City, there are still numerous areas that are difficult for bicycle travel. These
areas are marked by high vehicular speeds, high traffic volumes, lack of shoulders, lack of designated bike
lanes though intersections, and the presence of on-street parking. Generally, areas that are difficult for
bicycle travel are located in the more densely developed areas of Dover. A railroad line, a waterway, and
a divided highway all cut north-to-south through Dover, limiting east-west travel to only three or four routes.
Autos and trucks are all concentrated onto these few heavily traveled roads, leaving little or no room for
bicycle travel.
Through the development of this Bicycle Plan update, with input from the City of Dover and the public, the
below areas have been identified as impediments to safe bicycle travel in the City:
• College Road from McKee Road to Kenton Road is narrow, has heavy traffic, and lacks both
pedestrian and bicycle infrastructure.
• SR 8/Division Street between US 13 and West Street is designated as a Regional Bicycle Route by
DelDOT yet lacks bike lanes, striped shoulders, or a designated off-road pathway. There is also
significant on-street parking.
• Loockerman Street is narrow with heavy traffic and on-street parking.
• Mifflin Road between SR 8/Forrest Avenue and SR 15/Hazlettville Road connects Dover High School
with points south, including Schutte Park and the shared use pathway on Hazlettville Road.
Currently the road lacks both pedestrian and bicycle infrastructure.
• Martin Luther King Boulevard, from US 13 to Bay Road has no shoulders and heavy traffic.
• North Street east of the railroad tracks is narrow with heavy traffic and no shoulders.
• Walker Road west of Saulsbury Road, has heavy traffic and no shoulders. There are no parallel
alternative routes west of the railroad tracks.
• State Street south of Walker Road is narrow, has no striped shoulders, and has significant on-street
parking.
These areas generally lack safe, attractive alternative routes. For a cyclist, these roads often offer the only
means of traveling to and from a destination, despite the barriers that exist along these routes.
67
DOVER BICYCLE AND PEDESTRIAN PLAN ׀40
Page 68
Item 4.
Figure 18. Map showing bicyclist facilities including shared use pathways and low-stress streets. Not all low-stress streets
include dedicated bicycle facilities. For more information on low-stress streets see pages 60-61. Source: DelDOT
68
DOVER BICYCLE AND PEDESTRIAN PLAN ׀41
Page 69
Item 4.
Crash Analysis
As part of the assessment of conditions within the City, crash data from 2013 to 2019 was analyzed to determine
the number and severity of pedestrian and bicycle crashes that occurred during that seven-year period. In
addition, the analysis was used to determine if there were any concentrated areas of pedestrian or bicycle
crashes, in an effort to identify future engineering or enforcement solutions that could potentially address the
crash history. Figures 21-22 show the number and time of day of pedestrian and bicycle crashes, and Figures 23-
24 show the location of all reported pedestrian and bicycle crashes that occurred within City limits from 2013 to
2019 as compiled by the City of Dover Police Department. Listed below is a summary of the crash data:
• There were 142 reported pedestrian crashes and 76 reported bicycle crashes between 2013 and 2019
• Personal injuries were involved in 122 crashes (84%) for pedestrians and 69 crashes (91%) for bicycles
• There were 16 fatal pedestrian crashes and 2 fatal bicycle crashes reported over the seven-year period
• There were no high concentrations of pedestrian or bicycle crash areas identified throughout the City;
however, over 24% of the pedestrian and bicycle crashes occurred at various locations along US 13
• As noted in the chart below, the majority of the pedestrian crashes (54) occurred between 6:00 PM and
midnight; the majority of bicycle crashes (33) occurred between noon and 6:00 PM
Pedestrian & Bicycle Crashes
2013-2019
35
30
25
20
15
10
5
0
2013 2014 2015 2016 2017 2018 2019
Pedestrian Crashes 16 20 29 20 20 20 17
Bicycle Crashes 12 12 14 6 11 15 6
Pedestrian Crashes Bicycle Crashes
Figure 19. Pedestrian & Bicycle Crashes 2013-2019
Pedestrian & Bicycle Crashes Time of Day
2013 - 2019
60
50
40
30
20
10
0
Midnight to 6:00am 6:00am to Noon Noon to 6:00pm 6:00pm to Midnight
Pedestrian 20 26 43 54
Bicycle 3 21 33 19
Pedestrian Bicycle
Figure 20. Pedestrian & Bicycle Crashes Time of Day, 2013-2019
69
DOVER BICYCLE AND PEDESTRIAN PLAN ׀42
Page 70
Item 4.
Figure 21. Pedestrian crash locations, 2013-2019
Figure 22. Bicycle crash locations, 2013-2019
70
DOVER BICYCLE AND PEDESTRIAN PLAN ׀43
Page 71
Item 4.
71
DOVER BICYCLE AND PEDESTRIAN PLAN ׀44
Page 72
3. WHERE WE’RE HEADED
Item 4.
72
DOVER BICYCLE AND PEDESTRIAN PLAN ׀45
Page 73
Item 4.
Goals & Objectives
Goal 1. Improve the pedestrian and bicycle transportation network
• Consider the needs of all user groups
• Identify key gaps in the network and areas of safety concern
• Develop project ideas for gaps where solutions are not immediately obvious; seek the advice of
creative and experienced professionals
• Prioritize project requests and advocate for funding
• Track projects from planning through completion
• Seek especially to produce low-traffic, low-stress bicycle routes that are continuous
Goal 2. Coordinate regular pedestrian and bicycle network maintenance
• Establish maintenance responsibility for all pedestrian and bicycle routes
• Encourage responsible parties to schedule regular maintenance
• Advertise communication system for reporting maintenance needs
• Actively provide notice and citations to property owners
• Integrate mainteance (snow, debris, and vegetation removal) into routine actions of City street
crews
• Inventory and schedule replacement of damaged or root-lifted concrete, blacktop, or brickwork
• Schedule regular restriping of crosswalks and other painted markers
Goal 3. Incorporate pedestrian and bicycle elements into land-use and development planning
• Review local land-use and development ordinances and recommend the incorporation of bicycle
accommodations
• Seek requirements of “back exits” in single entrance developments
Goal 4. Encourage adequate and secure bicycle parking
• Identify locations where bicycle parking is especially needed
• Review bicycle parking requirements in zoning codes and recommend revisions as needed
• Develop programs to encourage installation of bike parking facilities where zoning requirements
are not effective
• Require larger proposed businesses to incorporate showers into their facility design
Goal 5. Utilize educational programs for encouraging pedestrian and bicycle safety
• Bike-to-Work Day
• Bike-to-School Day
• Traffic Skills 101 (League of American Bicyclists)
• Develop signage and maps for low-traffic, low-stress bicycle routes
• Bicycle safety programs for school children, in cooperation with DelDOT and the Capital School
District
Goal 6. Monitor use of pedestrian and bicycle facilities
• Select pedestrian and bicycle survey tools for counting pedestrians and bicyclists
• Schedule regular and repeating counts to detect changes
• Survey bicyclists of all ages and abilities for unmet facility needs
• Regularly report trends in commute, utility, recreational, and school cycling
73
DOVER BICYCLE AND PEDESTRIAN PLAN ׀46
Page 74
Item 4.
Agency Support
Goals and objectives will be tracked and implemented by the City of Dover with support from the
Dover/Kent County MPO and DelDOT. The City of Dover Safety Advisory and Transportation Committee
meets monthly and advises City Council on issues concerning the Dover transportation network, including
pedestrian and bicycle infrastructure. Those meetings are open to the public.
Advocacy and Interest Groups
In Delaware, there are two primary organizations that are advocates for bicycling interests throughout the
state, the Delaware Bicycle Council and Bike Delaware. The Delaware Bicycle Council consists of 15
members who represent various government agencies (public safety, transportation, education,
recreation, public health), as well as citizen representatives from each county. The primary purpose of the
Delaware Bicycle Council is to “consider, review, and work on matters pertaining to bicycling, bicycle
safety, and bicycle education, and to make recommendations to various state agencies.” The Delaware
Bicycle Council serves as a resource in policy-making and legislative issues, in order to ultimately increase
facilities and opportunities for bicyclists in Delaware.
There are a number of local bicycle advocates who advise the City and City Council Safety, Advisory, and
Transportation Committee on bicycle infrastructure.
Bike Delaware is an independent, non-government advocacy
organization that is supported solely by its membership. Its mission is
“Bike Delaware advocates for safe, convenient, and fun bicycling
and walking for everyone.” Bike Delaware, based in New Castle
County, has a 7-member Board of Directors and is staffed by an
Executive Director who lobbies for cycling interests throughout the
state.
The Downstate Delaware Striders and Riders is a group of bicyclists
and runners who regularly hold events in and around the Dover area.
The group holds weekly trail runs, in addition to regularly participating
in running and bicycling events such as the Buffalo Stampede in the
nearby Town of Wyoming. The group includes both recreational and
competitive cyclists and runners.
74
DOVER BICYCLE AND PEDESTRIAN PLAN ׀47
Page 75
Item 4.
75
DOVER BICYCLE AND PEDESTRIAN PLAN ׀48
Page 76
4. WHAT’S UNDERWAY
Item 4.
76
DOVER BICYCLE AND PEDESTRIAN PLAN ׀49
Page 77
Item 4.
Walking in Dover
PEDESTRIAN FACILITY DESIGN
The design of Dover’s street network dates back to the early 1700s, when the predominant form of
transportation was walking. As a result, virtually every street within the traditional core of the City has
sidewalks, which roughly includes the area from Walker Road to Water Street (north to south) and US 13 to
Saulsbury Road (east to west). Loockerman Street, the original commercial area of Dover, is an excellent
example of a traditional pedestrian-friendly street, complete with continuous sidewalks, mixed land use,
and buildings close to the street. The majority of the land use in downtown Dover is residential, with sidewalks
fronting virtually every street. While much of the land use is residential, there are numerous pedestrian
generators and attractors in downtown Dover, including the new Dover Library, Transit Center, Post Office,
City Hall, State government buildings, and numerous shops and restaurants. Downtown Dover also has a
significant amount of open space in the downtown area, including The Green, Legislative Mall, and Silver
Lake Park, all of which attract large numbers of pedestrians.
Based on an inventory that was conducted by the MPO as part of the preparation of the 2015 Pedestrian
Plan, pedestrian needs are more evident in the areas of the City that were developed after the traditional
core was completely developed. While the majority of residential subdivisions developed since the 1940s
have sidewalks, there are numerous State-maintained roads that do not have sidewalks. When these roads
were built on the outskirts of the City, the adjacent land was undeveloped or agricultural, and sidewalks
were not warranted. As the adjacent land began to develop, sidewalks or other adequate pedestrian
facilities were often not incorporated into the land development. This has changed in recent times, as
developers have been required to install sidewalks as part of the development approval process for over
30 years.
77
DOVER BICYCLE AND PEDESTRIAN PLAN ׀50
Page 78
Item 4.
PEDESTRIAN NETWORK DESIGN & PROJECT PRIORITIZATION
As part of the development of the 2015 Pedestrian Project Prioritization
Pedestrian Plan, a quantitative analysis was Criteria Measure Points
used to prioritize pedestrian needs in the Bus Stop Within ¼ Mile 2
City. This analysis has been used by the Within ½ Mile 1
MPO to prioritize sidewalk needs in other Commercial Within ¼ Mile 2
Kent County municipalities. The analysis Destinations Within ½ Mile 1
considered the factors listed in the table to
Community Center Within ¼ Mile 2
the right. Within ½ Mile 1
The prioritization criteria take into account Recreational Facility Within ¼ Mile 2
Within ½ Mile 1
a variety of land use and transportation
conditions for each road that was School Within ¼ Mile 2
Within ½ Mile 1
evaluated. Land use conditions include
High-density residential Within ¼ Mile 2
proximity to pedestrian generators and
Within ½ Mile 1
attractors such as commercial uses,
Proximity to existing Within 1 block 2
recreational facilities (parks), and schools. More than 1 1
Transportation conditions include presence
sidewalks
block
of bus stops, proximity to sidewalks, and the Presence of shoulders No shoulders 2
presence of shoulders along a road. Partial shoulders 1
Factors that considered a project’s cost Continuous 0
were also included, with respect to a shoulders
project’s potential impact to property and Property impacts None/Minimal 2
engineering factors such as drainage, Potential 1
utilities, and environmental impacts. Significant 0
Drainage/utility/ None/Minimal 2
environmental Potential 1
Significant 0
Maximum 20
Figure 23. Pedestrian Project Prioritization Criteria
78
DOVER BICYCLE AND PEDESTRIAN PLAN ׀51
Page 79
Item 4.
CRITICAL GAPS IN THE PEDESTRIAN NETWORK
Based on the DelDOT ADA Inventory and Assessment Map and the 2015 Pedestrian Plan inventory, a total
of 16 State-maintained roads (representing 33 road segments) that currently do not have sidewalks or have
significant sidewalk gaps were evaluated and prioritized. While the majority of the City’s residential
communities have sidewalks, there are some local streets where sidewalks do not exist. Examples include
streets within older communities such as Edgehill or East Lake Gardens. These are well-established
communities, with low volumes and low speeds, and the cost, property impacts, etc. likely outweigh the
need for sidewalks in these areas. As a result, sidewalks were not evaluated in these communities. These
gaps will be addressed by planned projects (see page 66) or proposed projects (see page 85).
In Table 2, entries in the “Status” field mean the following:
• Planned: there is a project in the DelDOT Capital Transportation Program that will address the issue
• All Users Recommendation: there is a proposed project that will address improvements for walkers
and cyclists along the corridor
• Pedestrian Recommendation: there is a proposed project that will address improvements for
walkers along the corridor
79
DOVER BICYCLE AND PEDESTRIAN PLAN ׀52
Page 80
Table 2. Roadway segments and intersections without adequate pedestrian infrastructure Item 4.
Roadway Segments Lacking Pedestrian Infrastructure
Road Limits Issues Status
West-East Routes (listed from north to south)
College Road Kenton Road to McKee Road Missing sidewalk Planned
College Road East of McKee Road Missing sidewalk Pedestrian
Recommendation
W. Division Street West of S. West Street Missing sidewalk Pedestrian
Recommendation
E. Division Street/ Gaps between US 13 and SR 1 Missing sidewalk All Users Recommendation
North Little Creek
Road
SR 8/ Mifflin Road to Dover High Missing sidewalk All Users Recommendation
Forrest Ave (south School
side)
Forest Street West of S. West Street Missing sidewalk Pedestrian
Recommendation
South Little Creek City Limits to Babb Drive Missing sidewalk Pedestrian
Road (Target entrance) Recommendation
North-South Routes (listed from west to east)
Mifflin Road SR 8 to Hazlettville Road Missing sidewalk All Users Recommendation
Kenton Road SR 8 to Chestnut Grove Road Missing sidewalk Planned
West Street North Street to Queen Street Missing sidewalk Planned
North State Street Silver Lake to Lepore Drive Missing sidewalk Pedestrian
Recommendation
Pennsylvania Avenue Kings Highway to Division Missing sidewalk Pedestrian
Street Recommendation
US 13 (Northbound) MLK Boulevard to White Oak Missing sidewalk Planned
Road
Dover Mall to Denneys Road
US 13 (Southbound) North State Street to Missing sidewalk Planned
Townsend Boulevard
Kings Highway to Division
Street
US 13 (Northbound Gaps between Public Safety Missing sidewalk Pedestrian
and Southbound) Boulevard and South State Recommendation
Street
Intersections Lacking Pedestrian Infrastructure
Intersection Limits Issues Status
Crossing College DSU Student Housing and DSU DSU Pedestrian Study Pedestrian
Avenue campus Recommendation
US 13/Roosevelt NA No pedestrian signal Pedestrian
Avenue or crosswalks Recommendation
US 13/South State NA No pedestrian signal Pedestrian
Street or crosswalks Recommendation
US 13/Webbs Lane NA No pedestrian signal Pedestrian
or crosswalks Recommendation
South State NA No pedestrian signal Pedestrian
Street/Webbs Lane or crosswalks Recommendation
80
DOVER BICYCLE AND PEDESTRIAN PLAN ׀53
Page 81
Item 4.
DELDOT ADA SELF-ASSESSMENT AND TRANSITION PLAN
This plan outlines actions that will be taken to make transportation facilities in the public right-of-way
accessible to all individuals. Although pedestrian amenities including sidewalks, curb ramps, crosswalks, and
pedestrian signals are located along State maintained rights of way throughout much of Dover, not all
pedestrian infrastructure is compliant with ADA regulations. Additionally, some locations are missing
pedestrian accommodations entirely.
As part of the self-assessment, DelDOT conducted an exhaustive inventory of pedestrian facilities located
in the DelDOT right of way, which was documented using GIS (geographic information systems). A detailed
view of that assessment is shown on the next page. The DelDOT ADA Inventory and Assessment Map
includes the following:
• Compliant Sidewalk
• Non-compliant Sidewalk
• Missing Sidewalk Link
• Pinch Point
• Marked Crosswalk
• Pedestrian Signal
• Curb Ramps
• Curb Barrier
• Horizontal Gap
• Vertical Elevation Difference
• Bus Stop Patron Pad
• Driveway crossing
• Driveway Crossing Non-Compliant Sidewalk
• On Street Parking
• Railroad Crossing
All pedestrian facilities within the DelDOT right of way must be designed or retrofitted to be in compliance
with the Americans with Disabilities Act (ADA). Compliant standards used by DelDOT are:
• DelDOT Road Design Manual
• DelDOT Standard Construction Details
• DelDOT Development Coordination Manual
• Manual on Uniform Traffic Control Devices (MUTCD)
• DelDOT Pedestrian Accessibility Standards
The plan includes a short-term (next five years) schedule to bring noncompliant features into compliance
with funding from the capital transportation program or STIP. DelDOT also instituted the Pedestrian Access
Route (PAR) program in order to address complaints, gaps in the pedestrian network, and non-compliant
locations that cannot be addressed within the scope of existing programs and projects.
81
DOVER BICYCLE AND PEDESTRIAN PLAN ׀54
Page 82
Item 4.
Figure 24. Detail of DelDOT ADA Self- Assessment Map
82
DOVER BICYCLE AND PEDESTRIAN PLAN ׀55
Page 83
Item 4.
Biking in Dover
BICYCLE FACILITY DESIGN
There are a wide variety of design techniques and facilities that provide for safe and efficient bicycle travel.
The table below provides a summary of the different on-road and off-road bicycle facilities. These
techniques are cited in publications such as the DelDOT Road Design Manual, the Delaware Manual on
Uniform Traffic Control Devices (MUTCD), the American Association of State Highway and Transportation
Officials (AASHTO) Guide for the Development of Bicycle Facilities (2012), and the National Association of
City Transportation Officials (NACTO) Urban Bikeway Design Guide (2014). Images for on-road facilities
below are from the NACTO Urban Bikeway Design Guide.
Table 3. On and off-road bicycle facility types from the NACTO Urban Bikeway Design Guide
On-Road Bicycle Facilities
Type Width Use Example
Bike lane 5-6 Bicycle travel
feet along the road
Colored 4-6 Bicycle travel
feet along the road,
Bike Lane
used in areas of
high vehicular
conflict
Buffered 7-9 Bicycle travel
feet along the road,
Bike Lane
preferred where
space allows
wider
infrastructure
Type Width Use Example
83
DOVER BICYCLE AND PEDESTRIAN PLAN ׀56
Page 84
Item 4.
Cycle 10-16 Route within the
feet road, separated
Track
from motored
vehicles and
pedestrians,
appropriate on
high-speed high-
volume roadways
Bicycle N/A Low-volume, low-
speed roads
Boulevard
where bicycle
travel is given
priority over
motor vehicles
Sharrows N/A Low-volume, low-
speed roads
where bike lanes
aren’t practical
84
DOVER BICYCLE AND PEDESTRIAN PLAN ׀57
Page 85
Item 4.
Off-Road Bicycle Facilities
Type Width Use Example
Shared 8-10 Route separated
feet from motor
Use
vehicles and
Pathway shared with
pedestrians.
Often parallel to
high speed roads
Trail 8-10 Recreational
feet route that
connects with the
overall bicycle
network
85
DOVER BICYCLE AND PEDESTRIAN PLAN ׀58
Page 86
Item 4.
BICYCLE NETWORK DESIGN
Guidance for selecting the appropriate facility for any given corridor type is provided by the Federal
Highway Administration (FHWA) Bikeway Selection Guide (2019). Collectively, these bicycle facilities make
up the city’s bicycle network. A robust bicycle network requires thoughtful planning in order to provide
good connections and access to destinations. The Bikeway Selection Guide identifies three different bicycle
user profiles: interested but concerned, somewhat confident, and highly confident; and highlights the fact
that different types of users are comfortable using different types of infrastructure, as shown in the graphic
below. The design of the bicycle network dictates where high quality facilities are needed due to the
roadway condition and adjacent user groups.
Figure 25. Bicyclist design user profiles from the FHWA Bikeway Selection Guide.
Note: the percentages above reflect only adults who have a stated interest in bicycling.
With user groups in mind, the Guide offers seven principles of bicycle network design shown in the graphic
below. Following these principles will result in a bicycle network that provides a safe and convenient
transportation alternative for all users. Coupled with this guide, a Level of Traffic Stress analysis of the local
transportation network provides a useful way to determine which facility types are appropriate given the
physical characteristics of the corridor, including speed, number of lanes, and volume as explained in the
next section.
Figure 26. Seven Principles of Bicycle Network Design from the Bikeway Selection Guide.
86
DOVER BICYCLE AND PEDESTRIAN PLAN ׀59
Page 87
Item 4.
LEVEL OF TRAFFIC STRESS
All areas of the City do not enjoy equal access to the
bicycle network since some parts of the network are only
usable by bicyclists comfortable with a high level of traffic
stress. According to Northeastern University Professor Peter
Furth, who coined the term, Level of Traffic Stress (LTS) is a
term used to describe the “combination of perceived
danger and other stressors associated with riding a bike
close to motor traffic.” LTS analysis uses factors such as the
speed of traffic, volume of traffic, and the number of lanes
to rate each roadway segment on a scale of 1 to 4, where
1 is a low-stress place to ride and 4 is a high-stress place to
ride, as shown in Figure 29. Figure 30 shows the
characteristics (number of lanes, volume of traffic, and
speed of traffic) that impact bicyclist comfort. When
mapped, LTS shows the total connectivity of a network
and enables the evaluation of how many destinations can
be accessed using low-stress routes
Both the City’s Comprehensive Plan and the State’s
Blueprint for a Bicycle-Friendly Delaware require the use of
LTS analysis in local bicycle network planning. This has
allowed for targeted investments in bicycle infrastructure
that increase the safety of the network and encourage
more users. For example, even though US 13 has bike
lanes, they are rarely used because high-speed traffic
makes them uncomfortable for most riders. Because of this
DelDOT is gradually improving US 13 to have shared use
Figure 27. Level of Traffic Stress descriptions and
pathways along both sides of the road. Improvements can examples
also be targeted to high-stress intersections that separate
multiple low-stress areas; for instance, a crossing over a
major road that separates two neighborhoods.
“…for a bicycling network to
attract the widest possible
segment of the population, its
most fundamental attribute
should be low-stress
connectivity, providing routes
between people’s origins and
destinations that do not
require cyclists to use links
that exceed their tolerance for
traffic stress, and that do not
involve undue level of Figure 28. Level of Traffic Stress evaluation chart for mixed-traffic conditions where there is
detour.” -Dr. Peter Furth not a bike lane or shoulder
87
DOVER BICYCLE AND PEDESTRIAN PLAN ׀60
Page 88
Item 4.
Figure 29. Level of Traffic Stress in the City of Dover. Source: version 4 of the DelDOT LTS Model.
88
DOVER BICYCLE AND PEDESTRIAN PLAN ׀61
Page 89
Item 4.
CRITICAL GAPS IN THE LOW-STRESS BICYCLE NETWORK
To ensure bicycling is within reach of most of the adult population, improvements are proposed to achieve
a target LTS of 2 or better. Some comments received during the development of the Plan suggested
removing recommended projects, but they were retained because existing conditions reflect LTS 3 or 4.
The 2015 Bicycle Plan identified and prioritized improvements for 12 roadway segments that discourage
bicycle use. Five of the segments identified in 2015 have been or will be addressed by planned DelDOT
projects (see page 66). The remaining prioritized segments from 2015 are included below in Table 4, along
with additional gaps that were identified based on public feedback, input from the Bicycle and Pedestrian
Subcommittee, and the LTS analysis of Dover’s streets.
In Table 5, entries in the “Status” field mean the following:
• Planned: there is a project in the DelDOT Capital Transportation Program that will address the issue
• All Users Recommendation: there is a proposed project that will address improvements for walkers
and cyclists along the corridor
• Bicycle Recommendation: there is a proposed project that will address improvements for cyclists
along the corridor
• Alternate: there is an alternate LTS 1 or 2 route available, as listed in Table 4
89
DOVER BICYCLE AND PEDESTRIAN PLAN ׀62
Page 90
Table 4. High-stress road segments with alternate low-stress routes for people who ride bikes Item 4.
Alternate Routes for People Bicycling
High-Stress Road Limits Low-Stress Alternative
West-East Routes (listed from north to south)
Walker Road Pear Street to State Street Ross Street
SR 8 Marsh Creek Lane to Saulsbury Off-road pathway
Road
Division Street West Street to Kent Avenue Fulton Street > Delaware Avenue
Loockerman Street West Street to State Street Bank Lane or Reed Street
MLK Boulevard Legislative Hall to US 13 Off-road pathway
North Street Schutte Park to Railroad Tracks Off-road pathway
North-South Routes (listed from west to east)
Governors Avenue Legislative Hall to US 13 Bradford Street > New Street >
Queen Street
N. State Street Walker Road to Cecil Street Bradford Street
S. State Street Hope Street to Wyoming Avenue S. Bradford Street
90
DOVER BICYCLE AND PEDESTRIAN PLAN ׀63
Page 91
Table 5. Roadway segments that are high-stress and discourage bicycle use Item 4.
Roadway Segments that Discourage Bicycle Use
Road Limits Issues Status
West-East Routes (listed from north to south)
College Road McKee Road to High traffic volumes (9,000/day) Bicycle
Kenton Road No bike lanes or shoulders Recommendation
LTS 3/4
College Road Multiple segments High traffic volumes (10,000/day) Bicycle
McKee Road to US Gaps in the shoulder Recommendation
13 LTS 3/4
Walker Road Multiple segments Moderate traffic volumes (7,500/day) Bicycle
Kenton Road to Gaps in the shoulder Recommendation
Saulsbury Road LTS 3/4
Walker Road Saulsbury Road to High traffic volumes (11,000/day) Bicycle
State Street No bike lanes, minimal shoulders Recommendation
LTS 3/4
White Oak Road US 13 to Garrison Moderate traffic volumes (8,000/day) Bicycle
Oak Drive Gaps in the shoulder Recommendation
LTS 3/4
SR 8/ West Street to US 13 High traffic volumes (13,000/day) Alternate
Division Street On-street parking, no bike lanes
Predominantly LTS 3
SR 8/ US 13 to SR 1 Moderate traffic volumes (8,000/day) All Users
Division Street/ Gaps in the shoulder Recommendation
North Little Creek Predominantly LTS 4
Road
North Little Creek SR 1 to Long Point Low traffic volumes (1,000/day) Bicycle
Road Road No shoulder Recommendation
LTS 4
MLK Boulevard/ Legislative Hall to High traffic volumes (11,000/day) All Users
South Little Creek Babb Drive No bike lane or shoulders Recommendation
Road LTS 3/4
South Little Creek Babb Drive to Fox Low traffic volumes (1,500/day) Bicycle
Road Road Gaps in the shoulder Recommendation
Predominantly LTS 3
91
DOVER BICYCLE AND PEDESTRIAN PLAN ׀64
Page 92
Item 4.
Roadway Segments that Discourage Bicycle Use (continued)
North-South Routes (listed from west to east)
Road Limits Issues Status
North-South Routes (listed from west to east)
Mifflin Road Intersections SR 8 to High Traffic volumes (15,000/day) All Users
Hazlettville Road Unmarked shoulder Recommendation
LTS 3/4
Kenton Road Denneys Road to High traffic volumes (12,000/day) Bicycle
Chestnut Grove Minimal shoulders, high Speeds Recommendation
Road LTS 4
Kenton Road Chestnut Grove High Traffic volumes (12,000/day) Planned
Road to SR 8 Minimal shoulders, high speeds
LTS 4
Saulsbury Road Multiple segments High traffic volumes (25,000/day) Planned
North Street to SR 8 Bike lane not continuous
LTS 4
S. West Street Water Street to High traffic volumes (8,000/day) Planned
Queen Street Partial pathway available
LTS 3/4
N. Burton Road POW/MIA Parkway High traffic volumes (11,000/day) Bicycle
to West Street Minimal shoulders, high speeds Recommendation
LTS 4
North State Street Intersection with US High traffic volumes (15,000/day) Bicycle
13 No shoulders at approach to intersection Recommendation
LTS 4
N./S. State Street Walker Road to High traffic volumes (8,000-13,000) Alternate
Lotus Street Parking on both sides/no shoulders
LTS 3/4
South State Street Lotus Street to US 13 High traffic volumes (10,000-13,000) Bicycle
4 lanes no shoulders Recommendation
LTS 4
Kings Highway NE E. Division Street to Moderate traffic volumes (7,000/day) Bicycle
US 13 No shoulders at approach to intersection Recommendation
LTS 3
US 13 Puncheon Run to Very high traffic volumes Multiple project
Scarborough Road (26,000-74,000/day) Recommendations
4-6lane high speed highway
LTS 4
92
DOVER BICYCLE AND PEDESTRIAN PLAN ׀65
Page 93
Item 4.
Planned DelDOT Projects
DelDOT has numerous projects planned in the City of Dover that will enhance mobility and safety for
pedestrians and bicyclists. Proposed projects shown in Table 6 are based on the DelDOT Fiscal Year 2021 -
2026 Capital Transportation Plan (CTP) as published in November 2020. Projects are listed in order of
anticipated construction date and alphabetically. The description indicates whether or not construction is
funded. Projects are also mapped in Figure 32.
Table 6. Planned DelDOT projects
Anticipated Project Limits Description
Construction
2022 HEP KC, SR 8 Carver Road Construction funded. This project will provide
and SR 15 to W. North operational, capacity, and safety improvements along
Intersection Street with a shared use pathway (east side), a sidewalk (west
Improvements side) and bike lanes.
2025 SR 8, Commerce Construction funded. This project includes a new
Connector Way to SR 8/ connector road from SR 8 to Commerce Way with two
from Forrest travel lanes and accommodation for bicycles and
Commerce Avenue sidewalks and/or shared use pathways for pedestrians.
Way to SR 8
2025 West Street, New Burton Construction funded. This project widens West Street to
New Burton Road to urban collector standards. Included in the project are
Road (Queen North Street bike lanes and sidewalks to connect to the Dover Transit
Street) to North (Queen Hub.
Street Street)
2026 K104, Kenton SR 8/ Forrest Construction funded. This project will provide operational
Road. SR 8 to Avenue to and safety improvements along with a shared use
Chestnut Chestnut pathway on the east side of the roadway, a sidewalk on
Grove Road Grove Road the west side of the roadway, and bike lanes in the
roadway.
2026+ College Road Kenton Road Construction not funded. This project includes pavement
to McKee rehabilitation, the construction of shoulders and
Road sidewalks on both sides of the road, and minor
intersection improvements to accommodate bicycles.
2026+ Loockerman Intersection Construction not funded. This project will include a series
Street/Forest of improvements that will encourage economic
Street development and alternate modes of transportation.
Improvements
2026+ Scarborough Scarborough Construction not funded. This project includes a new
Road C-D Road to Mall southbound collector-distributor (C-D) road adjacent to
Roads Boulevard SR 1 south of the Scarborough Road interchange.
93
DOVER BICYCLE AND PEDESTRIAN PLAN ׀66
Page 94
Item 4.
Figure 30. Map of DelDOT planned projects
94
DOVER BICYCLE AND PEDESTRIAN PLAN ׀67
Page 95
Item 4.
HEP KC, SR 8 and SR 15 Intersection Improvements
Project Type: Complete street/safety improvements
Ranked 6th in the 2015 Bike Plan and 1st in the 2017 Regional Plan
Project Description: The existing intersection of SR 8 - Forrest Avenue & SR 15 - Saulsbury Road is a signalized
intersection with a left-turn lane, through lane, bike lane, and channelized right-turn lane on the SR 15
approaches, and a left-turn, two through lanes, and a channelized right-turn on the SR 8 approaches. This
project proposes installing an additional through lane on northbound and southbound SR 15 at SR 8. The
project will also include a 10-foot shared use pathway along the west side of Saulsbury Road north of SR 8.
Project Justification: This project was cited in the 2012 Hazard Elimination Program, Site S for capacity and
safety improvements. Multi-modal improvements along Saulsbury Road in the vicinity of Division Street ranked
6th in the 2015 Bicycle Plan and 1st and 2nd 2017 Regional Bicycle Plan. Both plans called for completing the
bike lane along the west side of Saulsbury Road at Gateway west.
Connection to Low-Stress Network: This Saulsbury Road pathway continues along Saulsbury Road to the north
and south of project limits. It also connects to the Forrest Avenue pathway in the north and the W. North Street
pathway in the south.
Estimated Cost: $5,062,000
Timing: Design and Right-of-Way FY 2019 - FY 2021; Construction FY 2022
Recommendation: Provide comments on design to ensure project meets the needs of walkers and people who
ride bikes.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility
School X
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts
95
DOVER BICYCLE AND PEDESTRIAN PLAN ׀68
Page 96
Item 4.
Loockerman Street/Forest Street Improvements
Project Type: Intersection Improvements
Status: Included in the CTP
Project Description: This project will include a series of improvements in the vicinity of the intersection of Forrest
and Loockerman Street that will encourage economic development and alternative modes of transportation.
The planned improvements include implementing a roundabout to improve traffic circulation that
incorporates streetscape improvements, creating a pedestrian friendly zone at the railroad crossing, and
creating a new gateway with intersection improvements at Division Street and Forest Street.
Project Justification: This project will improve safety for multi-modal movements throughout the area and
encourage economic development as detailed in the 2015 Division/Forest Street Dover Capital Gateway Plan
and Design Book. This project was not included in the 2015 Bicycle or Pedestrian Plan but was included in the
TIP as a project that will provide a multi-modal connection.
Connection to Low-Stress Network: Unknown
Estimated Cost: $3,996,830
Timing: Construction not funded
Recommendation: Provide comments on design to ensure project meets the needs of walkers and people who
ride bikes.
Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility
School
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts X
Drainage/utility/environmental impacts X
96
DOVER BICYCLE AND PEDESTRIAN PLAN ׀69
Page 97
Item 4.
K104, Kenton Rd. SR 8 to Chestnut Grove Rd.
Project Type: Complete Street
Ranked 2nd in the 2015 Pedestrian Plan and ranked 10th in the Bicycle Plan
Project Description: This project will improve vehicle, pedestrian, and bicycle travel along Kenton Road (K104)
between SR 8/Forrest Avenue and Chestnut Grove Road (K158) in Dover. The improvements will involve
widening Kenton Road to include two 11-foot lanes with two five-foot shoulders along with curbs, sidewalks,
and bike lanes. A 10-foot wide shared use pathway will be provided along the east side of Kenton Road from
SR 8 to College Road and the pathway along the west side from College Road to West Carnoustie Road will
be continued. The project will include closed drainage, traffic calming, and safety improvements.
Project Justification: This stretch of Kenton Road in the City of Dover has remained unimproved for pedestrian
and bicycle access and still has open drainage for storm water. This project was ranked 2nd in the 2015
Pedestrian Plan and was listed as a proposed DelDOT project in the 2015 Bicycle Plan.
Connection to Low-Stress Network: Kenton Road is primarily LTS 4. This project will lower the LTS and provide a
low-stress connection between multiple residential neighborhoods and the pathway along Forrest Avenue to
the south.
Estimated Cost: $19,501,500
Timing: Design FY 2019 - FY 2021, Right-of-Way FY 2020 - FY 2021, Construction FY 2026
Recommendation: None. Project design has been finalized.
Criteria Presence
Bus stop X
Commercial activity X
Community center X
Recreational facility X
School X
High density community X
Existing sidewalks nearby X
Shoulders partial
Property impacts X
Drainage/utility/environmental impacts X
97
DOVER BICYCLE AND PEDESTRIAN PLAN ׀70
Page 98
Item 4.
West Street, New Burton Road to North Street
Project Type: Complete Street
Ranked 3rd in 2015 Pedestrian Plan and 4th in 2015 Bicycle Plan
Project Description: This project will include improvements to the road surface and provisions for pedestrian
and bicycle along West Street between W. North Street and S. Queen Street.
Project Justification: The Dover Transit Center is located at the southeast corner of the intersection of W. Water
Street and S. West Street. West Street is a critical connection for the DART Transit service in the city of Dover.
Buses use West Street to enter and exit the Transit Center. It is also a popular route for walkers and cyclists
between North Street and New Burton Road but has not been built to the standards for this use. The This is a
proposal for road improvements and non-motorized access on the street and for the Transit Center. This project
was identified by the Dover/Kent County MPO as part of their pedestrian studies. Multi-modal improvements
along West Street ranked 3rd in the 2015 Pedestrian Plan and 4th in the 2015 Bicycle Plan. A shared use pathway
between North Street and Water Street was completed in June 2018.
Connection to Low-Stress Network: This project will connect low-stress residential neighborhoods to the south
of the S. West Street/S. Queen Street intersection to the Dover Transit Center and the pathway along W. North
Street.
Estimated Cost: $1,300,000
Timing: Design FY 2022, Right-of-Way FY 2023 - FY 2024, Construction FY 2025
Recommendation: Provide comments on design to ensure project meets the needs of walkers and people who
ride bikes.
Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility X
School
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts likely
98
DOVER BICYCLE AND PEDESTRIAN PLAN ׀71
Page 99
Item 4.
College Road, Kenton Road to McKee Road
Project Type: Complete Street
Ranked 6th in the 2015 Pedestrian Plan, 3rd in the 2015 Bicycle Plan, and 4th in
the 2017 Regional Plan
Project Description: The proposed improvements consist of pavement rehabilitation, construction of shoulders
and sidewalks on both sides of College Road, minor intersection improvements to accommodate bicycles,
and minor drainage improvements. Some utility relocations will be necessary, as well as limited acquisition of
right-of-way and easements. Additionally, the entire roadway will be overlaid with new pavement. A shared
use pathway may be necessary to achieve a low LTS.
Project Justification: This project was identified by the City of Dover as a priority need and supported by the
Dover/Kent County MPO. This roadway serves as a critical east west connector and needs to address the
transportation needs for all modes and users. Multi-modal improvements along College Road ranked 6th in the
2015 Pedestrian Plan, 3rd in the 2015 Bicycle Plan, and 4th in the 2017 Regional Bicycle Plan.
Connection to Low-Stress Network: College Road between Kenton Road and McKee Road is currently LTS 3
and 4. This project will ensure continual bike lanes and sidewalks along College Road, connecting the pathway
along McKee Road to the proposed improvements along Kenton Road (described on page 70).
Estimated Cost: $4,250,000
Timing: Design FY 2023 - FY 2024, Right-of-Way FY 2025, Construction unfunded
Recommendation: Provide comments on design to ensure project meets the needs of walkers and people who
ride bikes.
Criteria Presence
Bus stop
Commercial activity limited
Community center
Recreational facility X
School X
High density community some
Existing sidewalks nearby none
Shoulders none
Property impacts X
Drainage/utility/environmental impacts likely
99
DOVER BICYCLE AND PEDESTRIAN PLAN ׀72
Page 100
Item 4.
Scarborough Road C-D Roads
Project Type: New Facility
Status: Included in CTP
Project Description: This project proposes a new southbound collector distributor road adjacent to SR 1 just
south of the Scarborough Road Interchange to allow for an additional access to the properties to the west of
SR 1 in this area. The project would also include on and off ramps for northbound SR 1 accessing the area of
Dover Mall and Dover Downs.
Project Justification: This project will relieve congestion on US 13, improve safety for multi-modal movements
throughout the area and encourage economic development. This project was part of the recommendations
from the Dover/Kent County MPO North Dover US 13 Study. The intent of this project is to relieve congestion
along the US 13 corridor by constructing a new access point from SR 1 to the commercial center near the
Dover Mall. This project was not included in the 2015 Bicycle or Pedestrian plan but was included in the TIP as
a project that will provide a multi-modal connection.
Connection to Low-Stress Network: This project would connect the low-stress neighborhoods located east of
US 13 and south of Scarborough Road to the pathway along Old Leipsic Road, and eventually, to Downtown
Dover via N. State Street.
Estimated Cost: $33,050,000
Timing: Design FY 2024, Right-of-Way unfunded, Construction unfunded
Recommendation: Provide comments on design to ensure project meets the needs of walkers and people who
ride bikes.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility
School
High density community
Existing sidewalks nearby
Shoulders
Property impacts X
Drainage/utility/environmental impacts X
100
DOVER BICYCLE AND PEDESTRIAN PLAN ׀73
Page 101
Item 4.
SR 8, Connector from Commerce Way to SR 8
Project Type: New Facility
Status: Included in TIP on page A-41, included in CTP on page 407
Project description: This project proposes a new connector road from SR 8 to Commerce Way. The connector
will consist of 2 travel lanes with accommodations for bicycles and sidewalks and/or multi use pathways for
pedestrians.
Project justification: This project was part of the recommendations from the Dover/Kent County MPO Route 8
Study. The intent of this project is to improve circulation and connectivity along the SR 8 corridor through Dover.
This project was not included in the 2015 Bicycle or Pedestrian plan but was included in the TIP as a project
that will provide a multi-modal connection.
Connection to Low-Stress Network: This project would connect the pathways along SR 8/Forrest Avenue with
the pathways along Route 15/W. North Street.
Estimated Cost: $2,500,000
Timing: Design FY 2021 - FY 2023, Right-of-Way FY 2024 - FY 2025, Construction FY 2025 - FY 2026
Recommendation: Provide comments on design to ensure project meets the needs of walkers and people who
ride bikes.
Criteria Presence
Bus stop X
Commercial activity X
Community center X
Recreational facility X
School
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts
101
DOVER BICYCLE AND PEDESTRIAN PLAN ׀74
Page 102
Item 4.
Figure 31. DelDOT Projects Portal is available to check on the status of any active project, just visit
deldot.gov/projects
102
DOVER BICYCLE AND PEDESTRIAN PLAN ׀75
Page 103
Item 4.
103
DOVER BICYCLE AND PEDESTRIAN PLAN ׀76
Page 104
5. HOW WE GET THERE
Item 4.
104
DOVER BICYCLE AND PEDESTRIAN PLAN ׀77
Page 105
Item 4.
Opportunities
The City of Dover, particularly in its downtown core, has had a long history of ensuring that the needs of
people walking and bicycling are considered and incorporated as part of land development and
transportation investment decisions. The City has made significant progress over the past several decades
in ensuring that the needs of people walking and bicycling are equitably addressed alongside other
transportation modes. This is reflected in the City’s municipal code, its land use design standards, and the
recent installation of numerous privately- and publicly-funded pedestrian and bicycle improvements
throughout the City. The City has required that sidewalks be installed as part of all new development
projects since at least the 1980s. The City’s first Traditional Neighborhood Design, the Eden Hill Farm, is being
developed as a community whose primary emphasis will be on the pedestrian and connectivity to adjacent
mixed land uses. Since the Bicycle and Pedestrian Plan was completed in 1997, the City has also developed
trail networks in its major parks, including Silver Lake Park and Schutte Park.
In addition, DelDOT has enhanced pedestrian mobility and safety as part of roadway improvement projects
on major routes such as Walker Road, South Governors Avenue, and North Street. DelDOT has also been
proactive about incorporating pedestrian needs into their traffic signal designs, as evidenced by recent
signal upgrades along Division Street and North Street. DelDOT has also prioritized the growth of the low-
stress bicycle network, as reflected by multiple shared use pathways and trails like the Capital City Trail and
the St. Jones River Greenway.
The City’s Bicycle and Pedestrian Subcommittee submitted applications to be designated as a “Walk
Friendly Community” and a “Bicycle Friendly Community,” during which the City’s policy, plans, programs,
and infrastructure were evaluated by a third party. The feedback the City received from these applications
is detailed on the next two pages and offers a good overview of the ways that Dover can grow to be even
more friendly to people walking and bicycling.
A variety of agencies, including the City of Dover, DelDOT, and the MPO, have identified areas that need
infrastructure improvements as well as policy recommendations. At the public workshop held on October
21, 2019, the public was also afforded the opportunity to identify locations where they feel uncomfortable
walking or biking. The information presented in this section details the areas of highest need within the City
as identified by the public, the Subcommittee, and applicable government agencies.
105
DOVER BICYCLE AND PEDESTRIAN PLAN ׀78
Page 106
Item 4.
WALK FRIENDLY COMMUNITY REPORT CARD
The City’s Bicycle and Pedestrian Subcommittee submitted an application to Walk Friendly Communities for
designation as a “Walk Friendly Community.” Recognition is awarded to places that have shown a
commitment to improving and sustaining walkability and pedestrian safety through comprehensive
programs, plans, and policies. After a detailed evaluation, communities are ranked Bronze, Silver, Gold, or
Platinum. Standards are high, and across the US a little more than 70 cities have achieved a ranking, with
only three achieving Platinum Status. In 2017, Dover’s application was evaluated and declined. Walk
Friendly Communities provided the City with numerous recommendations for improving conditions for
walking and encouraged the City to apply as soon as conditions improve.
One key recommendation was to revisit the pedestrian plan and incorporate more specific targets and
performance metrics that can be used to measure progress, including targets for safety and increasing the
number of walking trips. The City of Dover and the Bicycle and Pedestrian Subcommittee have evaluated
these recommendations and incorporated them into this document as appropriate.
Category Score* Recommendations
Status of Walking On the Right • Take steps to monitor pedestrian activity using regular
Track counts
• Examine at least five years of crash data to look for
trends and locations where you can focus your efforts
Planning On the Right • Revisit your pedestrian plan and incorporate specific
Track targets and performance metrics.
• Develop a Complete Streets Policy
• Create a standalone parking plan that encourages
walking, biking, and transit use
Education/Encouragement On the Right • Expand walk and bike to school programs by holding
Track more events throughout the year
• Improve wayfinding signage downtown that identifies
nearby destinations
• Hold Open Streets events to get people walking and
biking in the street
Engineering On the Right • Develop a plan to address filling sidewalk gaps
Track • Develop a plan to add accommodations for pedestrians
and bicyclists during the bridge rehabilitation process
Enforcement On the Right • Target yield enforcement using a pedestrian decoy
Track technique coupled with a progressive ticketing scheme
• Consider enforcing speed limits using automated
enforcement
Evaluation Needs • Invest in a few permanent count locations, set up a few
Attention short-duration counters, and conduct manual counts to
understand crash data and where investments are
needed
• Conduct pre- and post- evaluations for developments
and other projects to see how efforts have improved
pedestrian safety
* Scores are defined as follows:
• Walk Friendly: The responses in this section indicate that your community is particularly strong in this area with great efforts
being made towards improving walkability.
• On the Right Track: This score indicates that your community does not exhibit the characteristics to be truly walk friendly in
this section, but that there are still good existing programs or new programs that could be expanded.
• Needs Attention: This score indicates that your community does not yet demonstrate strong programs, policies, and results,
characteristic of a Walk Friendly Community based on the responses in this section.
Figure 32. Summary of the Walk Friendly Communities Community Report Card for Dover, Delaware.
106
DOVER BICYCLE AND PEDESTRIAN PLAN ׀79
Page 107
Item 4.
BICYCLE FRIENDLY COMMUNITY REPORT CARD
In 2013, the City’s Bicycle and Pedestrian Subcommittee submitted an application to the League of
American Bicyclists for designation as a “Bicycle Friendly Community.” The League awards communities
who apply for this designation after a detailed evaluation, and based on criteria that include engineering,
education, encouragement, enforcement, evaluation & planning. Using these criteria, the League further
ranks an awarded community as to its level of bike-friendliness with a Bronze, Silver, Gold or Platinum ranking.
Standards are high, and across the US, fewer than 300 cities have achieved Bicycle Friendly Community
awards, with only four of them achieving Platinum status. Although they were turned down, the 2013 Report
Card was used as a guide that led to a successful application process in 2017.
In 2017, Dover was awarded Bronze status which will be valid from 2017 to 2021. The League provided the
city with numerous recommendations for improving conditions for bicycling and earning Silver status,
including:
• Increasing the amount of high-quality bicycle parking throughout the community
• Improving Bike Month activities by creating a Bike to School Day Event
• Ensure there is a plan for continual improvements to the bicycle network with a goal of creating a
safe and comfortable bicycle network for people of all ages and abilities
The League gave the City good marks for an active bicycle advisory committee, which has since been
disbanded.
Figure 33. Bicycle Friendly Community Dover, DE Fall Report Card excerpt
107
DOVER BICYCLE AND PEDESTRIAN PLAN ׀80
Page 108
Item 4.
Recommendations
Based on the walking and bicycling network, the mix of land uses, and potential destinations, there are
ample opportunities to enhance walking and bicycling as modes of transportation in the City of Dover. This
Plan provides recommendations that correspond with the six “Es” approach supported by the League of
American Cyclists and Safe Routes to Schools: Equity, Engineering, Education, Encouragement,
Enforcement, and Evaluation. The concept was developed as a tool to aid communities in creating walk
and bicycle friendly places. Each “E” needs investment in order to get more people out walking and biking.
Engineering
Creating safe and
convenient places to
walk and bike
Evaluation & Education
Planning Giving people of all
ages and abilities
Equity
Planning for walking the skills and
and biking as a safe confidence to walk
& viable option and ride
Walking and biking is a safe
choice for all road users
regardless of where they live
Encouragement
Enforcement Creating a strong
active transportation
Ensuring safe roads culture that
for all users celebrates walking
and biking
Figure 34. The six "Es" of active transportation planning, adapted from the League of American Cyclists
108
DOVER BICYCLE AND PEDESTRIAN PLAN ׀81
Page 109
Item 4.
EDUCATION
Dover should undertake the following actions to educate people on how to walk and bike safely within the
City:
Develop wayfinding signage
Incorporate wayfinding signage on popular walking and
cycling routes and incorporate wayfinding signage into all
future projects. Signs should identify nearby destinations and
travel times. Regularly located signage that includes orientation
maps can also help walkers and bicyclists find their way around
the City.
Bike Delaware worked with DelDOT to develop user friendly
MUTCD compliant signs that are being used in Old New Castle
for riders to navigate between the recently completed Markell
Figure 35. MUTCD compliant bicycle wayfinding
Trail and New Castle’s downtown. This type of signage would signage
help Dover residents and visitors navigate the expanding low-
stress bicycle network.
Develop print and digital pedestrian and bicycle wayfinding maps
Develop maps that show low-stress routes for walkers and bicyclists.
Offer classes in partnership with existing organizations in Dover
The 2015 Bicycle Plan called for regularly occurring classes in Dover, open to local, statewide, and regional
attendees. The Dover Parks Department organized a Traffic Skills 101 class, but it was cancelled due to lack
of registrants. This plan proposes partnering with existing organizations, non-profits, employers, or institutions
to offer instruction. The partner organization can gauge interest and promote the event, and Bicycle and
Pedestrian Subcommittee can coordinate an appropriate instructor. Possible classes might include the
following:
• League-Certified Instructor Seminar
• Traffic Skills 101
• Traffic Skills 201
Provide workshops to the general public
In the past, the City has partnered with local bike shops to host Bicycle Maintenance Workshops. The City’s
Parks and Recreation Department is open to working with resource partners to host workshops again in the
future if requested. Workshop topics could include:
• Commuter skills
• Bicycle maintenance
• Bicycle safety
• Multi-sport clinic
Educational support
Support the Delaware Bicycle Council in having driver’s education programs include information on a
bicyclist’s right to use the road in Delaware. Also support DBC/DelDOT efforts to hand out bike lights. In
conjunction with the YMCA, host a minimum of 3 bike rodeos for youth, supporting them in developing
bicycle skills. Rodeos are held at the YMCA swim club and at the Police Department, as well as in Dover
schools. Additional rodeos could be held before the Ride of Silence and before the Mayor’s Bike Ride.
• Driver’s education program
• Bike light give-away
• Bike rodeos
109
DOVER BICYCLE AND PEDESTRIAN PLAN ׀82
Page 110
Item 4.
ENCOURAGEMENT
Dover should undertake the following actions to further encourage walking and cycling awareness within
the City:
Dover Bike to Work Day
The City of Dover hosts an annual Bike to Work day event each May in celebration of National Bike Month
hosted at Dover Public Library. The City provides, water, snacks, and socializing to riders on their way to
work. City and State officials are also on hand to share the work underway to make the city more bicycle
friendly.
Ride of Silence
The City of Dover hosts a Ride of Silence every year on the third Wednesday of May. The Ride of Silence is
a worldwide event where cyclists take to the road in a silent procession to honor cyclists who have been
killed or injured while cycling on public roadways. The Ride of Silence is a free ride, but requires participants
to wear helmets, ride no faster than 12 miles per hour, and remain silent throughout the course of the ride.
The goal of the event is to raise awareness to the general public, local officials, and police that cyclists have
a legal right to use public roadways.
Amish Country Bike Tour
Over 2,000 cyclists participate in this event, which offers distances from 15 to 100 miles. The tour starts and
ends at Legislative Mall in the center of Dover. The Tour is organized by and benefits Bike Delaware, and the
City of Dover provides assistance in the form of public safety, trash pickup, etc.
Mayor’s Bicycle & Fun Ride
Hosted by the Dover Mayor once a year, this ride encourages children and parents to ride their bikes with
the Chief Executive in a procession that circles through Dover.
Dover Duathlon
Held at Dover Park, this duathlon event requires participants to run and bike in a format similar to a triathlon,
beginning at a City park and winding throughout the streets of Dover.
Organized Run/Walks
Dover is home to multiple races that allow participants of all ages to walk, jog, or run to the finish line. These
events incorporate a variety of Dover Streets and trails in their routes.
110
DOVER BICYCLE AND PEDESTRIAN PLAN ׀83
Page 111
Item 4.
ENFORCEMENT
The City of Dover Police Department currently has police officers patrolling on bicycles in the downtown
area. It is strongly recommended that this presence be continued. Officers on bikes are more accessible to
people on foot and on bike.
In addition, the Bicycle and Pedestrian Subcommittee strongly encourages the enforcement of existing
traffic laws for both motorists and bicycles. The Subcommittee also recommends the City Planning
Department as well as members of the Subcommittee meet with the Dover Police Department to discuss
potential enforcement issues and actions. These could include the following
• Ensure that police are aware of the Bicycle Friendly Delaware Act which passed in October 2018.
The below information on the traffic implications of the Bicycle Friendly Delaware Act is from the Bike
Delaware website:
Requires motorists to change lanes (including when there is a double yellow line) when
passing bicycles when travel lanes are too narrow for side-by-side sharing (making “Three
Foot” passing a requirement only in the special case of wide lanes).
“As close as practicable to the right-hand edge of the roadway” (the dreaded “AFRAP“)
also disappears from state code (replaced by “far enough to the right as judged safe by
the operator to facilitate the movement of such overtaking vehicles unless the bicycle
operator determines that other conditions make it unsafe to do so“) and, again, only as a
special case for wide lanes.
Motorists forbidden to honk horns at cyclists when passing except for imminent danger.
General clarification of “where to ride” laws, including specifically permitting two-abreast
riding within the lane in a narrow lane.
The “Delaware Yield,” permitting/requiring bicyclists to yield at stop signs (when the coast
is clear), instead of requiring a complete stop at all stop signs with no exceptions.
• Use targeted information and enforcement to encourage motorists and cyclists to share the road
safely
• Use positive enforcement ticketing
• Conduct targeted yield enforcement coupled with a progressive ticketing scheme
• Appoint a law-enforcement contact person to interact with the local walking and bicycling
community
111
DOVER BICYCLE AND PEDESTRIAN PLAN ׀84
Page 112
Item 4.
EVALUATION & PLANNING
To determine the usage of pedestrian and bike facilities in Dover, and to monitor the growth in popularity
of walking and bicycling as a mode of transportation, the following actions should be taken:
• Using a pedestrian/bicycle counter, monitor use of the following shared use pathways, at least once
every season (four times a year):
a. Capital City Trail
b. Isaac Branch of the St. Jones River Trail
c. North Street bike trail
d. SR 8 shared use pathway
• Use volunteers to conduct live counts of walkers and cyclists at least every season (four times a year):
a. The new Senator Bikeway and bicycle boulevard
b. State Street
c. Loockerman Street
d. South Governors Avenue
• Examine at least five years of crash data to look for trends and locations where targeted
improvements can be made
To continue with the progress and development of Dover’s walk- and bike-friendly community status, the
following actions should be taken:
• Update the Bicycle and Pedestrian Plan every five years. The next update will be in 2025, thus the
production of that document should begin no later than the beginning of 2024
• Incorporate this Bicycle and Pedestrian Plan into the City of Dover Comprehensive Plan
ENGINEERING
Engineering recommendations are split into three categories:
• Projects for all users (pp. 86-94)
• Projects for people walking (pp. 96-105)
• Projects for people bicycling (pp. 106-121)
Each section includes a chart summarizing all recommended projects, followed by a one-page fact sheet
for each project which includes the project type, project description, project justification, connections to
the low-stress network, prioritization criteria, a project map, and project photo.
This section includes project ideas. Identifying a project here is not an assessment of feasibility or expression
of full public support. Advancing any one of these projects will require further analysis and public
engagement to further develop the proposed project scope and budget.
Before advancing a proposed project, the City should meet with community residents, organizations,
institutions, and businesses to gain an understanding of the project area, as well as historical perspectives
and experiences with the area that is being considered for improvements. These conversations will help
develop a project scope that reflects the desire of the community and should be completed before a
project is prioritized for funding. This will ensure that the project has public support before advancing, and
that the scope of the project is sufficient to address public concerns as the project advances through the
design process.
112
DOVER BICYCLE AND PEDESTRIAN PLAN ׀85
Page 113
Item 4.
Projects for All Users
Projects for all users are projects that include infrastructure for both people who walk and people who ride
bikes. Some projects are trail or pathway projects, but some are projects that call for both sidewalks and
on-road bicycle infrastructure, which are described as “Complete Street” projects. Projects below are
ordered alphabetically, not in order of priority.
Table 7. Projects for all users
Number Project Description Type
1 E. Division Street Complete the shared use pathway Shared Use Pathway
Connector (Park Drive to on the north side of E. Division Street
Bayard Avenue) between Park Drive and Bayard
Avenue.
2 E. Division Street/North Construct sidewalks and redesign the Complete Street
Little Creek Road (US 13 roadway to provide low-stress
to SR 1) bicycle and pedestrian travel along
SR 8 between US 13 and SR 1 and
address bicycle navigation through
the US 13 intersection.
3 Mifflin Road Multi-Modal Provide for low-stress bicycle and Complete Street
Improvements pedestrian access along Mifflin Road
(Hazlettville Road to between Hazlettville Road and
Forrest Avenue) Forrest Avenue.
4 MLK Boulevard Widen the existing sidewalk along Shared Use Pathway
Connector (Bay Road to MLK Boulevard between Bay Road
US 13) and US 13 to provide a shared use
pathway.
5 Senator Bikeway Phase II Construct a shared use pathway on Shared Use Pathway
(Forrest Avenue, Dover the south side of Forrest Avenue from
High School to Mifflin Mifflin Road to Dover High School.
Road)
6 South Bay Road Pathway Provide a shared use pathway along Shared Use Pathway
(South Little Creek Road the south side of Bay Road between
to Transportation Circle) South Little Creek Road and
Transportation Circle.
7 St. Jones River Trail Provide a new trail on the west side Shared Use Pathway
of the St. Jones River between Silver
Lake Park and Legislative Avenue. A
trail crossing will be necessary at
Division Street.
113
DOVER BICYCLE AND PEDESTRIAN PLAN ׀86
Page 114
Item 4.
Figure 36. Map showing locations of projects for all users
114
DOVER BICYCLE AND PEDESTRIAN PLAN ׀87
Page 115
Item 4.
E. Division Street Connector
Project Type: Shared use Pathway
Ranked 7th in the Regional Plan, 1st in the 2015 Bike Plan
1
Project Description: This project consists of a shared use pathway along the north side of SR 8 between Park
Drive and the shared use pathway constructed as part of the development of the parcel at the northwest
corner of US 13 and E. Division Street. At its west end, the project will connect with multiple low-stress bicycle
routes, so wayfinding signage will be a critical component.
Project Justification: This road segment presents a problem due to the narrow nature of the road, the multiple
travel lanes involved, and right of way constraints. At the northwest corner of Park Drive, the right turn lane
requires vehicles to yield, creating a high-stress situation for cyclists crossing Park Drive to enter the shared‐use
pathway into Silver Lake Park. Some cyclists will need to head south on the Capital City Trail, and some cyclists
coming north on the Capital City Trail may want to turn right to head east along SR 8.
Connection to the Low-Stress Network: At Park Drive the project connects with the shared use pathway running
north into Silver Lake Park, which will connect into the Senator Bikeway, providing low‐stress east‐west travel.
The project connects with the Capital City Trail, which travels south to the St. Jones Greenway Trail. At its east
end, the project connects with the striped shoulders on E. Division street east of US 13.
Recommendation: Complete the shared use pathway on the north side of E. Division Street between Park
Drive and Bayard Avenue.
Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility X
School
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts limited
Drainage/utility/environmental impacts
115
DOVER BICYCLE AND PEDESTRIAN PLAN ׀88
Page 116
Item 4.
2
E. Division Street/North Little Creek Road
Project Type: Complete Street
New Project
Project Description: Construct sidewalks to fill the gaps on the north (approximately 0.6 miles) and south sides
(approximately 1.1 miles) of E. Division Street between JH Brown Road and Acorn Road. Incorporate bike
improvements to lower level of traffic stress for road segments that are currently LTS 3 or 4. The project will also
address bicycle navigation through the US 13 intersection.
Project Justification: Currently, there are no shoulders or bike lanes for a 200 foot stretch of SR 8 directly to the
east of US 13. While shoulders exist further to the east, parking is currently allowed, resulting in a situation where
cyclists must enter the vehicular lane to avoid parked cars. Without improvements, neighborhoods east of US
13 located adjacent to E. Division Street/North Little Creek Road will be unable to access the eastern end of
the Senator Bikeway and Downtown Dover.
Connection to the Low-Stress Network: This project will connect to the proposed Senator Bikeway in the west
and low-stress neighborhoods to the north and south, allowing those neighborhoods access to Dover’s
Downtown.
Recommendation: Construct sidewalks and redesign the roadway to provide low-stress bicycle and pedestrian
travel along SR 8 between US 13 and SR 1 and address bicycle navigation through the US 13 intersection.
Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility X
School
High density community
Existing sidewalks nearby X
Shoulders
Property impacts X
Drainage/utility/environmental impacts limited
116
DOVER BICYCLE AND PEDESTRIAN PLAN ׀89
Page 117
Item 4.
Mifflin Road Multi-Modal Improvements
Project Type: Complete Street
Ranked 12th in the 2017 Regional Bike Plan, 8th in the 2015 Pedestrian Plan
3
Project Description: Provide multi-modal improvements along Mifflin Road between SR 8/Forrest Avenue and
Hazlettville Road.
Project Justification: Mifflin Road was evaluated as part of the Dover High School Pedestrian Study. Mifflin Road
is a 2-lane road with shoulders that carries over 15,000 vehicles per day between SR 8 and Hazlettville Road.
The speed limit is posted at 35 MPH, and a single-lane roundabout is located near the center of the limits to
provide traffic calming. The land use is low-density residential, with a bank and convenience store located at
the SR 8/Mifflin Road intersection. Schutte Park, a large recreational area owned by the City of Dover, is
located near the south end of Mifflin Road. There are about 300 feet of sidewalks along Mifflin Road adjacent
to the major intersections, so pedestrians currently use the paved shoulders along Mifflin Road.
The Dover High School Pedestrian Study determined that adding sidewalks along the entire length of Mifflin
Road would cost approximately $2.2 million, create potential adverse impacts to private property, and require
significant drainage improvements. Mifflin Road was identified as a priority bike route in the 2017 Regional Bike
Plan, which recommends marked bike lanes on the shoulders, and a roundabout that supports bicycle use.
Connection to Low-Stress Network: This project connects to the proposed Senator Bikeway in the north, the
North Street Bicycle Pathway in the south, to low-stress neighborhoods via Woodmill Road to the east, and to
low-stress neighborhoods via a shared use pathway to the west.
Recommendation: Provide for low-stress bicycle and pedestrian access along Mifflin Road between Hazlettville
Road and Forrest Avenue.
Criteria Presence
Bus stop
Commercial activity X
Community center X
Recreational facility X
School X
High density community X
Existing sidewalks nearby limited
Shoulders X
Property impacts X
Drainage/utility/environmental impacts X
117
DOVER BICYCLE AND PEDESTRIAN PLAN ׀90
Page 118
Item 4.
MLK Boulevard Connector
Project Type: Shared Use Pathway
Ranked 7th in the 2015 Bike Plan
4
Project Description: Widen the existing sidewalk between Bay Road and US 13 to facilitate a ten-foot-wide
shared use pathway to provide better connections to pathways on either end of the proposed project.
Project Justification: MLK Boulevard/South Little Creek Road provide a primary east-west route connecting the
central part of Dover with residential and commercial areas on the eastern limits of the city. Between SR 1 and
Downtown Dover, the route crosses two four-lane divided highways, Bay Road and US 13. The area is
predominantly urban, and includes major traffic generators such as Safeway, Target, Royal Farms, and Wawa.
Residential areas are present on the east and west side of Babb Drive and US 13, respectively. Sidewalks are
present throughout the corridor. There is a bike lane on westbound South Little Creek Road between Babb
Drive and Bay Road. There is no space available for bicyclists within the existing pavement between Bay Road
and US 13, and there are no bike lanes on eastbound South Little Creek Road. The Capital City Trail, a ten-foot-
wide shared use pathway, runs along the southwest corner of US 13 and MLK Boulevard and facilitates bicycle
access into downtown Dover. However, the 0.2-mile stretch between Babb Drive and US 13 prevents cyclists
from safely accessing this new trail from the areas east of Bay Road via South Little Creek Road.
Connections to the Low-Stress Network: This project will connect to the pathway on the south side of MLK
Boulevard west of US 13, to proposed improvements along South Little Creek Road to the east, and to the
proposed shared use pathway on the south side of Bay Road.
Recommendation: Provide a shared use pathway along MLK Boulevard between Bay Road and US 13 and
improve both intersections to facilitate safe use by bicyclists.
Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility
School
High density community X
Existing sidewalks nearby X
Shoulders X
Property impacts limited
Drainage/utility/environmental impacts
118
DOVER BICYCLE AND PEDESTRIAN PLAN ׀91
Page 119
Item 4.
Senator Bikeway Phase II
Project Type: Shared Use Pathway
Ranked 1st in the 2015 Bike Plan
5
Project Description: It is recommended that a shared use pathway be constructed on the south side of SR 8
between Mifflin Road and Dover High School.
Project Justification: The land use in this area is predominantly low-density residential, agricultural, and
institutional. Dover High School generates high pedestrian volumes along SR 8. The need for sidewalks along
the south side of SR 8, between Mifflin Road and the new Dover High School, was initially evaluated as part of
the Dover High School Pedestrian Study. That study identified the impacts associated with installing sidewalks
on both the north and south sides of SR 8. The high school installed a 10-foot wide shared use pathway along
its SR 8 frontage, as well as a pathway behind the existing homes closest to the new school. In addition, in the
summer of 2014, DelDOT constructed sidewalks along the north side of SR 8 and installed a HAWK pedestrian-
activated signal near the school. The City requested that this segment of road be taken on by DelDOT as Phase
II of the Senator Bikeway. At present, no funding has been allocated to this project.
Connection to the Low-Stress Network: This pathway will connect to the existing shared use pathway in front
of Dover High School in the west, the shared use pathway on the north side of SR 8 between Mifflin Road and
Saulsbury Road in the east, and the planned shared use pathway on the south side of SR 8 between Mifflin
Road and Saulsbury Road in the east.
Recommendation: Construct a shared use pathway on the south side of Forrest Avenue from Mifflin Road to
Dover High School.
Criteria Presence
Bus stop
Commercial activity Limited
Community center X
Recreational facility X
School X
High density community some
Existing sidewalks nearby X
Shoulders X
Property impacts X
Drainage/utility/environmental impacts X
119
DOVER BICYCLE AND PEDESTRIAN PLAN ׀92
Page 120
Item 4.
South Bay Road Pathway
Project Type: Shared Use Pathway
New Project
6
Project Description: Provide a continuous pathway along the south side of Bay Road between South Little
Creek Road and Transportation Circle.
Project Justification: Bay Road is a high-stress corridor that connects DelDOT’s administration building, the Blue
Hen Corporate Center, and Kent County Levy Court with the commercial district along US 13 and low-stress
routes into Downtown Dover. There are gaps in the current pathway along Bay Road that if completed would
connect these destinations with the existing and proposed low-stress network.
Connections to the Low-Stress Network: Connects to the MLK Boulevard/South Little Creek Road existing and
proposed pathways in the north and the St. Jones River Greenway in the south.
Recommendation: Provide a shared use pathway along the south side of Bay Road between South Little Creek
Road and Transportation Circle.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility
School
High density community X
Existing sidewalks nearby
Shoulders X
Property impacts limited
Drainage/utility/environmental impacts
120
DOVER BICYCLE AND PEDESTRIAN PLAN ׀93
Page 121
Item 4.
St. Jones River Trail
Project Type: Shared Use Pathway
Feasibility study in the 2015 Bike and Pedestrian Plans
7
Project Description: As part of the 2015 Bicycle and Pedestrian Plan’s public involvement effort, the City of
Dover’s Silver Lake Commission requested that a new trail (or shared use pathway) be constructed on the west
side of the St. Jones River, from Silver Lake Park, across Division Street, to Legislative Avenue near the Dover
Post Office. This trail would provide recreational access to Silver Lake Park from a wide variety of uses in
downtown Dover, including the Post Office, the Dover Library, the Department of Natural Resources and
Environmental Control (DNREC) complex, and Fraizer’s restaurant. The trail would complete a loop network
around the St. Jones River by connecting Silver Lake Park with the existing sidewalks near the Post Office,
Library, and DNREC facilities. Sidewalks are currently located only on the east side of the St. Jones River, along
Park Drive. Phase III of the Capital City Trail, completed in the fall of 2014, widened these existing sidewalks to
provide for a 10-foot wide shared use pathway on the east side of the river.
Project Justification: According to the Silver Lake Commission’s request, “the Commission seeks these trail
improvements predominantly from the standpoint of improving outdoor amenities within Silver Lake Park and
along the St. Jones River, though we are quite cognizant of the economic benefits it would provide downtown
Dover and the health and quality of life benefits it would provide our residents and visitors.”
Connections to the Low-Stress Network: This project would connect low-stress neighborhoods in the northern
part of Dover’s downtown with the Green.
Recommendation: Provide a new trail on the west side of the St. Jones River between Silver Lake Park and
Legislative Avenue. A trail crossing will be necessary at Division Street.
Criteria Presence
Bus stop
Commercial activity
Community center
Recreational facility X
School
High density community X
Existing sidewalks nearby X
Shoulders NA
Property impacts X
Drainage/utility/environmental impacts X
121
DOVER BICYCLE AND PEDESTRIAN PLAN ׀94
Page 122
Item 4.
THIS PAGE INTENTIONALLY LEFT BLANK
122
DOVER BICYCLE AND PEDESTRIAN PLAN ׀95
Page 123
Item 4.
Walking Projects
Table 8. Walking projects
Number Project Description Type
8 College Road Pedestrian Implement a pedestrian crosswalk Pedestrian Crossing
Crossing on College Road between Jason
Court and Delaware State University.
9 College Road Sidewalks Construct sidewalks to fill the gap on New Sidewalks
(east of McKee Road) the north side of College Road east
of the McKee Road intersection.
10 Forest Street (Lincoln Construct sidewalks on the north New Sidewalks
Street to S. West Street) and south sides of Forest Street
between Lincoln Street and US 13.
11 North State Street (Silver Construct sidewalks to fill gaps along New Sidewalks
Lake to US 13) the northbound side of North State
Street.
12 Pennsylvania Avenue Construct sidewalks on the west side New Sidewalks
Sidewalks (Division Street of Pennsylvania Avenue between
to Kings Highway) Division Street and Kings Highway.
13 S. Dupont Highway Construct sidewalks on the west side New Sidewalks
(Public Safety Boulevard of US 13 between River Road and
to South State Street) Webbs Lane, and the east side of US
13 between Laurel Drive and the
Capitol One Diner, and from
Roosevelt Avenue to S. State Street.
14 S. Little Creek Road (east Construct sidewalks to fill in the gap New Sidewalks
of Roberta Avenue) in the sidewalk along South Little
Creek Road.
15 W. Division Street (Ridgely Fill the gap in the sidewalk on the New Sidewalks
Street to S. West Street) south side of W. Division Street west of
S. West Street.
123
DOVER BICYCLE AND PEDESTRIAN PLAN ׀96
Page 124
Item 4.
12
Walking Projects
Railway
Parks and Open Spaces
Dover City Limits
Figure 37. Map showing locations of walking projects
124
DOVER BICYCLE AND PEDESTRIAN PLAN ׀97
Page 125
Item 4.
College Road Pedestrian Crossing
Project Type: Pedestrian Crossing
Recommendation from the 2015 Pedestrian Plan and
8
2019 Delaware State University Pedestrian Study
Project Description: Implement a pedestrian crosswalk on College Road between Jason Court and Delaware
State University.
Project Justification: The 2018 Delaware State University Pedestrian Counts found substantial pedestrian traffic
between the University Courtyard Apartments on College Road and the DSU Campus. Few pedestrians crossed
at the intersections at College Road since the existing sidewalk ties into Old College Road before the
intersection. The study recommends exploring a mid-block crossing across College Road that utilizes a
Rectangular Rapid Flashing Beacon (RRFB) activation or other enhanced treatment. This proposed crossing
will offer a safe pathway across College Road since there are no marked crossings south of Jason Court.
Connections to the Pedestrian Network: This crosswalk will connect existing sidewalks on the north and south
side of College Road.
Recommendation: Implement a pedestrian crosswalk on College Road between Jason Court and Delaware
State University.
Criteria Presence
Bus stop X
Commercial activity
Community center
Recreational facility
School X
High density community X
Existing sidewalks nearby X
Shoulders X
Property impacts
Drainage/utility/environmental impacts
125
DOVER BICYCLE AND PEDESTRIAN PLAN ׀98
Page 126
Item 4.
College Road Sidewalks
Project Type: New Sidewalks (DelDOT)
New Project
9
Project Description: Construct sidewalks to fill the gap on the north side of College Road immediately east of
the McKee Road intersection.
Project Justification: There is a 500-foot gap in the sidewalk on the north side of College Road east of the
McKee Road intersection. The parcel is currently vacant. Upon development of the site, the developer will be
required by the City to provide sidewalks.
Connections to the Pedestrian Network: This sidewalk will connect to existing sidewalks to the east. Sidewalks
to the west along College Road will be constructed as part of the College Road project detailed on page 72.
This will also connect to the existing sidewalk and pathway on McKee Road.
Recommendation: Construct sidewalks to fill the gap on the north side of College Road east of the McKee
Road intersection.
Criteria Presence
Bus stop X
Commercial activity
Community center
Recreational facility
School
High density community X
Existing sidewalks nearby X
Shoulders X
Property impacts limited
Drainage/utility/environmental impacts
126
DOVER BICYCLE AND PEDESTRIAN PLAN ׀99
Page 127
Item 4.
Forest Street Sidewalks
Project Type: New Sidewalks (DelDOT)
New Project
10
Project Description: Construct sidewalk on the north side and repair sidewalk on the south side of Forest Street
between Lincoln Street and S. West Street.
Project Justification: There is no pedestrian connectivity between Lincoln Street and S. West Street. This corridor
traverses an at grade railroad crossing and connects downtown Dover to residential neighborhoods to the
west.
Connections to the Pedestrian Network: This project will connect to existing sidewalks to the east and west.
Recommendation: Construct sidewalks on the north and south sides of Forest Street between Lincoln Street
and S. West Street.
Criteria Presence
Bus stop X
Commercial activity X
Community center X
Recreational facility
School X
High density community
Existing sidewalks nearby X
Shoulders X
Property impacts limited
Drainage/utility/environmental impacts limited
127
DOVER BICYCLE AND PEDESTRIAN PLAN ׀100
Page 128
Item 4.
North State Street Sidewalks
Project Type: New Sidewalks (DelDOT)
Ranked 5th in the 2015 Pedestrian Plan
11
Project Description: Fill the gaps in the sidewalk on the northbound side of North State Street between the Silver
Lake Bridge and US 13. There are gaps between Silver Lake and Lepore Drive (approximately 0.13 miles) and
a 90-foot section between the Family Dollar parking lot and the Second Chance thrift store parking lot directly
to the north. In the southbound direction, North State Street has sidewalks throughout its limits.
Project Justification: North State Street provides a direct north-south connection from downtown Dover to US
13. There are several pedestrian attractors and generators in the area. There are numerous businesses and
shopping opportunities located near the intersection of US 13 and North State Street. In addition, there is a
shopping center located at the intersection of North State Street and Lepore Road. McGlynn’s and the
Countrie Eatery are restaurants located on Silver Lake on the west side of the road. Several high-density
residential communities are located near North State Street, including The Overlook on Silver Lake and
Hiawatha Lane Apartments. Due to its scenic nature, particularly across Silver Lake, North State Street is
regularly used by joggers and walkers for recreational use. The area between Silver Lake and Lepore Road has
landscaping that causes pedestrians to walk in the travel lane. The property with the landscaping was recently
purchased by a developer. If the property is redeveloped, sidewalks along North State Street would be
required by the City. The remaining gap would likely be filled in as individual businesses re-developed and
would likely not be provided as part of a DelDOT improvement project.
Recommendation: Construct sidewalks to fill gaps along the northbound side of North State Street.
Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility X
School
High density community X
Existing sidewalks nearby
Shoulders X
Property impacts X
Drainage/utility/environmental impacts likely
128
DOVER BICYCLE AND PEDESTRIAN PLAN ׀101
Page 129
Item 4.
Pennsylvania Avenue Sidewalks
Project Type: New sidewalk (City)
Recommended in the 2015 Pedestrian Plan
12
Project Description: Construct sidewalks on the west side of Pennsylvania Avenue between Division Street and
Kings Highway.
Project Justification: Pennsylvania Avenue is a City-maintained street that runs north to south in the heart of
Dover. Sidewalk exists along the entire street, with the exception of an approximately 175-foot section on the
west side of the street between Division Street and Kings Highway. The land use in this area is a mix between
low-density residential, small-scale commercial, the DNREC office complex, and the Governor’s Café
restaurant. A DART bus stop is located at the intersection of Pennsylvania Avenue and Kings Highway. Based
on the surrounding land uses, there is a relatively high volume of pedestrian activity in the area.
Connections to the Pedestrian Network: This sidewalk will connect to existing sidewalks to the north along E.
Division Street and the south along Kings Highway SW.
Recommendation: Construct sidewalks on west side of Pennsylvania Avenue between Division Street and
Kings Highway.
Criteria Presence
Bus stop
Commercial activity X
Community center X
Recreational facility X
School X
High density community X
Existing sidewalks nearby limited
Shoulders X
Property impacts X
Drainage/utility/environmental impacts X
129
DOVER BICYCLE AND PEDESTRIAN PLAN ׀102
Page 130
Item 4.
S. Dupont Highway
Project Type: New Sidewalks (DelDOT)
New Project
13
Project Description: Construct sidewalks on the west side of US 13 between River Road and Webbs Lane, and
the east side of US 13 between Laurel Drive and the Capitol One Diner, and from Roosevelt Avenue to S. State
Street.
Project Justification: There is no pedestrian connectivity over the St. Jones River Bridge. Low-density residential
is located on both sides of the bridge, along with a variety of commercial uses along US 13.
Connections to the Pedestrian Network: These sidewalks will connect to the pathway along Public Safety
Boulevard, to additional sidewalks along US 13 to the north, and to the neighborhoods of south Dover in the
south.
Recommendation: Construct sidewalks on the west side of US 13 between River Rd. and Webbs Ln., and the
east side of US 13 between Laurel Dr. and the Capitol One Diner, and from Roosevelt Ave to S. State St.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility
School
High density community
Existing sidewalks nearby limited
Shoulders X
Property impacts limited
Drainage/utility/environmental impacts limited
130
DOVER BICYCLE AND PEDESTRIAN PLAN ׀103
Page 131
Item 4.
S. Little Creek Road (Babb Drive to JH Brown Boulevard)
Project Type: New Sidewalks (DelDOT)
Ranked 1st in the 2015 Pedestrian Plan
14
Project Description: Fill the gap in the sidewalk network along South Little Creek Road on the south side of the
road east of Roberta Avenue along the Schoolview community.
Project Justification: While South Little Creek Road has 8- to 11-foot shoulders that can facilitate pedestrian
movement, sidewalks provide a safer walking environment along a heavily used pedestrian corridor. The
existing land use along South Little Creek Road between US 13 and SR 1 is marked by a mixture of high-density
apartments, single-family residential, light industrial, and large-scale commercial uses. The commercial uses
include high-pedestrian attractors such as Target, Safeway, Royal Farms, and several fast-food restaurants
located at the western limits of the area. There is also a convenience store located on the south side of the
road near Tudor Industrial Park. South Little Creek Road also provides a direct access to destinations in
downtown Dover, US 13, and Bay Road, all within a relatively short walking distance. In addition, East Dover
Elementary School is a significant pedestrian generator. Finally, there are 4 DART bus stops on South Little Creek
Road between US 13 and SR 1. Based on this mixture of land uses, and proximity to a wide variety of
destinations, there is a steady volume of pedestrians that walk along South Little Creek Road.
Recommendation: Construct sidewalks to fill in the gap in the sidewalk along South Little Creek Road.
Criteria Presence
Bus stop X
Commercial activity X
Community center X
Recreational facility X
School
High density community X
Existing sidewalks nearby X
Shoulders X
Property impacts likely
Drainage/utility/environmental impacts likely
131
DOVER BICYCLE AND PEDESTRIAN PLAN ׀104
Page 132
Item 4.
W. Division Street
Project Type: New Sidewalks (DelDOT)
New Project
15
Project Description: Fill the gap in the sidewalk on the south side of W. Division Street west of S. West Street.
Project Justification: During Phase I of the Senator Bikeway project, sidewalks were installed on the north side
of W. Division street west of West Street. There is a 380-foot gap in the sidewalk on the south side of W. Division
street immediately west of the intersection with West Street. This corridor traverses an at grade railroad crossing
and connects downtown Dover to commercial areas to the west. The only nearby marked and signalized
crossing that facilitates safe pedestrian access across W. Division Street is at the intersection with Weston Drive,
about 0.25 miles west of the West Street intersection. There is a marked unsignalized crossing at Kirkwood Street,
about 100 feet east of the West Street intersection.
Connections to the Pedestrian Network: This project will connect to existing sidewalks to the east and west.
Recommendation: Fill the gap in the sidewalk on the south side of W. Division Street west of S. West Street.
Criteria Presence
Bus stop X
Commercial activity X
Community center X
Recreational facility
School X
High density community
Existing sidewalks nearby X
Shoulders X
Property impacts limited
Drainage/utility/environmental impacts limited
132
DOVER BICYCLE AND PEDESTRIAN PLAN ׀105
Page 133
Item 4.
Bicycling Projects
Table 9. Bicycling projects
Number Project Recommendation Type
16 Bank Lane and The Green Install wayfinding marking and Wayfinding Marking
(S. West Street to MLK signage to highlight the low-stress & Signage
Boulevard) route along Bank Lane between
West Street to MLK Boulevard.
17 College Road East Provide low-stress bicycle facilities Bicycle Facility
(McKee Road to US 13) along College Road between
McKee Road and US 13.
18 Kenton Road (Chestnut Provide low-stress bicycle facilities Bicycle Facility
Grove Road to Denneys along Kenton Road between
Road) Chestnut Grove Road and Denneys
Road.
19 Kings Highway NE (E. Provide low-stress bicycle facilities Bicycle Facility
Division Street to US 13) along Kings Highway NE between E.
Division Street and US 13.
20 Lakewood Place/N. New Explore the viability of a north-south Study/Wayfinding
Street/S. New bicycle boulevard through Marking & Signage
Street/Monroe Terrace downtown Dover along Lakewood
Bike Boulevard Place/New Street/Monroe Terrace.
21 New Burton Road Evaluate New Burton Road for Study
(POW/MIA Parkway to S. bicycle improvements.
West Street)
22 North Little Creek Road Provide low-stress bicycle facilities Bicycle Facility
(SR 1 to SR 9) along north Little Creek Road
between SR 1 and SR 9.
23 North State Street and US Improve the approaches and the Bicycle Facility
13 Intersection intersection of N. State Street and US
13 to accommodate bicycle travel.
24 South Little Creek Road Provide low-stress bicycle facilities Bicycle Facility
(Bay Road to Fox Road) along South Little Creek Road between
Bay Road and Fox Road.
25 South State Street (Lotus Provide low-stress bicycle facilities Bicycle facility
Street to US 13) along South State Street between
Lotus Street and the south side of the
intersection with US 13.
26 Walker Road East (North Provide low-stress bicycle facilities Bicycle Facility
State Street to Saulsbury along Walker Road between N. State
Road) Street and Saulsbury Road.
27 Walker Road West Provide low-stress bicycle facilities Bicycle Facility
(Saulsbury Road to along Walker Road between
Kenton Road) Saulsbury Road and Kenton Road.
28 US 13 Commercial District Install wayfinding marking and Wayfinding Marking
Bicycle Boulevard signage to highlight the low-stress & Signage
route between Leipsic Road and
Dover Mall.
29 White Oak Road (US 13 to Provide low-stress bicycle facilities Bike Facility
Garrison Oak Drive) along White Oak Road between US 13
and Garrison Oak Drive.
133
DOVER BICYCLE AND PEDESTRIAN PLAN ׀106
Page 134
Item 4.
Figure 38. Map showing locations of bicycling projects
134
DOVER BICYCLE AND PEDESTRIAN PLAN ׀107
Page 135
Item 4.
Bank Lane and The Green
Project Type: Wayfinding Marking & Signage
Ranked 23rd in 2017 Regional Bike Plan
16
Project Description: Install wayfinding marking and signage to highlight the low-stress route along Bank Lane
between West Street to MLK Boulevard. Bank Lane is a low volume east‐west street, between West St. and the
Green. Bank Lane can serve as a bicycle route into Downtown from the Transit Center on West St. Signage
designating the road as “Bike Route to Downtown” or “Downtown Bike Route” should be designed and
installed at key points along the street.
Project Justification: Signage and pavement markings will provide guidance to riders in Dover’s downtown
and connect pathways on the west side of downtown with trails on the east side.
Connections to the Low-Stress Network: At the west end of Bank Lane, the intersection with S West Street, a
shared‐use pathway (in design) will run south to the Transit Center and north to connect with the existing
shared‐use pathway along the south side of North Street. That pathway, in turn, extends westward to Schutte
Park and connects with shared‐use pathways that follow the West Dover Connector and Saulsbury Road. At
the east end of Bank lane are The Green, the Historic District, and the government complex.
Recommendation: Install wayfinding marking and signage to highlight the low-stress route along Bank Lane
between West Street to MLK Boulevard.
Criteria Presence
Bus stop x
Commercial activity x
Community center
Recreational facility
School
High density community x
Existing sidewalks nearby x
Shoulders
Property impacts
Drainage/utility/environmental impacts
135
DOVER BICYCLE AND PEDESTRIAN PLAN ׀108
Page 136
Item 4.
College Road East
Project Type: Bicycle Facility
New Project
17
Project Description: Provide low-stress accommodations for cyclists between McKee Road and US 13. High-
stress segments include between the railroad tracks and McKee Road, between Mishoe Street and Jason
Street, and between US 13 and the start of the existing sidewalk.
Project Justification: College Road between US 13 and McKee Road varies between LTS 4 and 2 throughout
its length. Pinch points along the corridor create higher stress conditions. Some small improvements could result
in a low-stress route from DSU’s campus at US 13 to the pathway along the west side of McKee Road.
Connections to the Low-Stress Network: Uninterrupted, wide shoulders on College Road between US 13 and
McKee Road would connect to the McKee Road pathway and the College Road improvements planned to
the west. The project also provides a lower stress connection to Dover Mall in the east.
Recommendation: Provide low-stress accommodations along College Road between McKee Road and US 13.
Criteria Presence
Bus stop X
Commercial activity
Community center
Recreational facility
School X
High density community X
Existing sidewalks nearby X
Shoulders X
Property impacts
Drainage/utility/environmental impacts
136
DOVER BICYCLE AND PEDESTRIAN PLAN ׀109
Page 137
Item 4.
Kenton Road (Chestnut Grove Road to Denneys Road)
Project Type: Bicycle Facility
New Project
18
Project Description: Widen the road to accommodate shoulders/bike lanes along Kenton Road between
Chestnut Grove Road and Denneys Road.
Project Justification: Provides a safe place for cyclists heading north out of Dover to ride.
Connections to the Low-Stress Network: Connects to planned improvements south of Chestnut Grove Road.
The project would also provide a connection to the Fork Branch Nature Preserve on Kenton Road just south of
Denneys Road.
Recommendation: Provide low-stress accommodations along Kenton Road between Chestnut Grove Road and
Denneys Road.
Criteria Presence
Bus stop
Commercial activity
Community center
Recreational facility
School
High density community
Existing sidewalks nearby
Shoulders
Property impacts X
Drainage/utility/environmental impacts X
137
DOVER BICYCLE AND PEDESTRIAN PLAN ׀110
Page 138
Item 4.
Kings Highway NE
Project Type: Bicycle Facility
New Project
19
Project Description: Provide low-stress accommodations for people who bike along Kings Highway NE between
E. Division Street and US 13. Depending on right-of-way and utility constraints, this bicycle facility may be a
shared use pathway or on-road protected bike lane. Improve the intersection with US 13 to create a low-stress
crossing to connect to the proposed on-road bicycle facilities on White Oak Road.
Project Justification: Connects downtown Dover to the east side of Dover and the US 13 corridor.
Connections to the Low-Stress Network: Connects to proposed bicycle facilities on White Oak Road in the east,
and the existing Silver Lake pathway network, which is part of the Senator Bikeway, in the south.
Recommendation: Provide low-stress accommodations along Kings Highway NE between E. Division Street
and US 13.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility X
School
High density community
Existing sidewalks nearby X
Shoulders
Property impacts X
Drainage/utility/environmental impacts X
138
DOVER BICYCLE AND PEDESTRIAN PLAN ׀111
Page 139
Item 4.
Lakewood Place/New Street/Monroe Terrace
Bike Boulevard
Project Type: Study/Wayfinding Marking & Signage
20
Unranked in 2015 Bike Plan
Project Description: Explore the viability of a north-south bicycle boulevard through downtown Dover along
Lakewood Place/New Street/Monroe Terrace. The bike boulevard will consist of wayfinding signage and
pavement markings but may also require traffic calming measures so that traffic stress is low, especially at
intersections with arterials.
Project Justification: This project will highlight a low-stress north-south bicycle route through downtown Dover.
Connections to the Low-Stress Network: This route will connect to the low-stress neighborhood streets north of
Division Street, Phase I of the Senator Bikeway at Cecil Street, Bank Lane, and the low-stress neighborhoods
south of Water Street.
Recommendation: Explore the viability of a north-south bicycle boulevard through downtown Dover along
Lakewood Place/New Street/Monroe Terrace.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility X
School X
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts
139
DOVER BICYCLE AND PEDESTRIAN PLAN ׀112
Page 140
Item 4.
New Burton Road
Project Type: Study
Unranked in 2015 Bike Plan
21
Project Description: Evaluate New Burton Road for bicycle improvements between POW/MIA Parkway and S.
West Street. An analysis of the speed limit along New Burton Road should also be included in the study, to
determine if a speed limit reduction would make conditions more conducive for bicycling. The current speed
limit is 45 MPH.
Project Justification: New Burton Road is a 2-lane local road that is currently LTS 3 and provides direct access
from Camden and Wyoming to Dover, a distance of nearly 2 miles. North of Webbs Lane, all of New Burton
Road lies within City limits. South of Webbs Lane, only the west side of the road lies within the City’s boundaries.
The Norfolk Southern railroad lies on the west side of the road. In the northbound direction, New Burton Road
has continuous shoulders throughout the entire City limits. However, in the southbound direction, there are no
shoulders from Webbs Lane to north of Kesselring Avenue, forcing bicyclists to share the travel lane with motor
vehicles in this 0.5-mile segment.
Connections to the Low-Stress Network: Bicycle improvements along New Burton Road would connect to the
POW/MIA pathway in the south and the S. West Street pathway in the north.
Recommendation: Evaluate New Burton Road for bicycle improvements.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility X
School
High density community X
Existing sidewalks nearby
Shoulders minimal
Property impacts
Drainage/utility/environmental impacts
140
DOVER BICYCLE AND PEDESTRIAN PLAN ׀113
Page 141
Item 4.
North Little Creek Road
Project Type: Bicycle Facility
Ranked 22nd in 2017 Regional Bike Plan
22
Project Description: Provide low-stress bicycle facilities along North Little Creek Road between SR 1 and SR 9.
North Little Creek Road is one of the main routes between Dover and Little Creek. Shoulders exist between US
13 and SR 1, but not east of SR 1. There are no special upgrades to intersections anticipated for this project.
Only part of this corridor is located within the City of Dover.
Project Justification: This project will create bicycle accommodations on a roadway with no shoulders,
reducing the level of traffic stress.
Connections to the Low-Stress Network: At the west end of this project, SR 8/North Little Creek Road has striped
shoulders leading west into Dover. At the east end of this project is the intersection with SR 9 which contains
striped shoulders heading south through the Town of Little Creek, and north to Bombay Hook National Wildlife
Refuge, Augustine Wildlife Area and the Mike Castle Trail along the C&D Canal.
Recommendation: Provide low-stress bicycle facilities along North Little Creek Road between SR 1 and SR 9.
Criteria Presence
Bus stop
Commercial activity
Community center
Recreational facility
School
High density community
Existing sidewalks nearby
Shoulders
Property impacts X
Drainage/utility/environmental impacts X
141
DOVER BICYCLE AND PEDESTRIAN PLAN ׀114
Page 142
Item 4.
North State Street and US 13 Intersection
Project Type: Bicycle Facility New Project 23
Project Description: Improve the approaches and the intersection of N. State Street and US 13 to
accommodate bicycle travel.
Project Justification: When the 2015 Bicycle Plan was written there was no existing on- or off‐road bike access
from downtown Dover to US 13 north of Loockerman Street. The plan called for a protected bike lane or bike
bridge on State Street between US 13 and Walker Road. Since that time, DelDOT reduced N. State Street from
four to three travel lanes; the current configuration includes a bike lane in each direction, two vehicular lanes,
and a center turn lane. However, the road diet does not continue all the way to the intersection with US 13 or
address bicycle navigation through the intersection with US 13. This corridor intersects with Governor’s Avenue
and Walker Road in the south, Lepore Road and Hiawatha Lane north of the bridge, and US 13 at the northern
limits. Intersection design will need to take into account the multiple directions that bicyclists may take after
traveling the length of this project, heading either north or south. The improvement of the North State Street
corridor between Walker Road and US 13 was ranked 6th in the 2017 Regional Plan and 2nd in the 2015 Bicycle
Plan.
Connections to the Low-Stress Network: The south end connects to central Dover’s network of neighborhood
streets, providing access to Downtown Dover and Legislative Hall and connecting with the Senator Bikeway
to travel westward, or the Capital City Trail south to the St. Jones River Trail. The north end connects to the
(proposed) US 13 Commercial District Bicycle Pathway located on the east side of the intersection with US 13.
The (proposed) Walker Road bike facilities (project numbers 26 and 27) will provide a connection to the west.
Recommendation: Improve N. State Street and US 13 to accommodate bicycle travel.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility
School
High density community X
Existing sidewalks nearby X
Shoulders X
Property impacts
Drainage/utility/environmental impacts
142
DOVER BICYCLE AND PEDESTRIAN PLAN ׀115
Page 143
Item 4.
South Little Creek Road
Project Type: Bicycle Facility
New Project
24
Project Description: Provide low-stress bicycle facilities along South Little Creek Road between Bay Road and
Fox Road. Connect any on-road bicycle infrastructure to the pathway network proposed to the west of the
Bay Road intersection.
Project Justification: The majority of South Little Creek Road is considered LTS 3 due to vehicular speeds,
volumes, and presence of turn lanes.
Connections to the Low-Stress Network: Uninterrupted shoulders on South Little Creek Road would connect to
low-stress neighborhoods to the north and south, the east part of the roadway, which is LTS 2, and the proposed
pathway west of Bay Road that will provide a connection to downtown Dover.
Recommendation: Provide low-stress bicycle facilities along South Little Creek Road between Bay Road and Fox
Road.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility
School
High density community
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts
143
DOVER BICYCLE AND PEDESTRIAN PLAN ׀116
Page 144
Item 4.
South State Street
Project Type: Bicycle Facility
New Project
25
Project Description: Provide low-stress bicycle facilities along South State Street between Lotus Street and the
south side of the intersection with US 13.
Project Justification: There are currently no alternate routes between central Dover and the neighborhoods
south of Puncheon Run Connector.
Connections to the Low-Stress Network: This project connects to low-stress neighborhood streets to the east
and west and an existing shared use pathway on the west side of the US 13 intersection in the south.
Recommendation: Provide low-stress bicycle facilities along South State Street between Lotus Street and the
south side of the intersection with US 13.
Criteria Presence
Bus stop X
Commercial activity
Community center
Recreational facility X
School X
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts
144
DOVER BICYCLE AND PEDESTRIAN PLAN ׀117
Page 145
Item 4.
Walker Road East
Project Type: Bicycle Facility
Ranked 5th in the 2017 Regional Bike Plan, 5th in the 2015 Bike Plan
26
Project Description: Provide low-stress bicycle facilities along Walker Road between N. State Street and
Saulsbury Road.
Project Justification: Walker Road between North State Street and Saulsbury Road is a 0.9-mile roadway that is
LTS 3 and 4. Between North State Street and Silver Lake Boulevard, the roadway consists of a two-lane roadway
section, with partially designated shoulders and no bike lanes through the intersections. The curb to curb width
is about 35 feet. On-street parking is permitted on a portion of the south side of Walker Road. Between Silver
Lake Boulevard and Saulsbury Road, the typical section converts into a 3-lane roadway. There are minimal
shoulders, no bike lanes, and no on-street parking. The curb to curb width between Silver Lake Boulevard and
Saulsbury Road is about 44 feet. There is not sufficient width to accommodate a continuous bicycle lane
throughout the corridor. Between North State Street and Silver Lake Boulevard, there is likely enough pavement
width to provide for a 4-foot-wide bicycle lane in each direction. However, this would not provide bicycle
lanes through the intersections of Walker Road/Silver Lake Boulevard/Carol Street and Walker Road/Pat Lynn
Drive/Pear Street. West of Silver Lake Boulevard, there may be an opportunity to reduce the lane widths slightly
to provide for a 4-foot-wide shoulder.
Connections to the Low-Stress Network: This project connects to low-stress neighborhood streets to the south,
the N. State Street bike lanes to the east, and the Saulsbury Road pathway to the west.
Recommendation: Provide low-stress bicycle facilities along Walker Road between N. State Street and
Saulsbury Road.
Criteria Presence
Bus stop X
Commercial activity
Community center
Recreational facility X
School X
High density community X
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts
145
DOVER BICYCLE AND PEDESTRIAN PLAN ׀118
Page 146
Item 4.
Walker Road West
Project Type: Bicycle Facility
New Project
27
Project Description: Provide low-stress bicycle facilities along Walker Road between Saulsbury Road and
Kenton Road.
Project Justification: This section of Walker Road is currently LTS 2, 3, and 4. Due to current road striping and turn
lanes, this portion of roadway has multiple high-stress pinch points on an otherwise low-stress roadway.
Connections to the Low-Stress Network: Uninterrupted shoulders on Walker Road would connect to the
Saulsbury Road pathway in the east, the planned Kenton Road pathway in the west, and low-stress
neighborhood streets north and south of the corridor.
Recommendation: Provide low-stress bicycle facilities along Walker Road between Saulsbury Road and Kenton
Road.
Criteria Presence
Bus stop
Commercial activity X
Community center
Recreational facility
School
High density community
Existing sidewalks nearby
Shoulders
Property impacts
Drainage/utility/environmental impacts
146
DOVER BICYCLE AND PEDESTRIAN PLAN ׀119
Page 147
Item 4.
US 13 Commercial District Bicycle Boulevard
Project Type: Wayfinding Marking & Signage Project
Ranked 3rd in 2017 Regional Bike Plan
28
Project Description: Create a 0.75‐mile off‐road route between the Dover Mall and Leipsic Road to provide for
low-stress bicycle access to the commercial properties. An off-road route can be created through a series of
small connections between the business parking lots, along with striping and signage. This is not a construction
project; Dover zoning change may be required, allowing the businesses to give up parking spaces without
being penalized. Signage and pavement markings could be used to direct bicyclists along the route. Special
consideration will be needed to assist bicyclists to cross the entrance road into Dover Downs.
Project Justification: This project is a low‐stress alternative to the bike lanes that currently exist on US 13, a high‐
speed roadway with heavy auto volumes.
Connections to the Low-Stress Network: It would connect, at its southern end, with a pathway on the north side
of Leipsic Road, which connects with proposed bike & pedestrian improvements on North State Street.
.
Recommendation: Install wayfinding marking and signage to advertise the low-stress route between Leipsic
Road and Dover Mall.
Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility
School
High density community
Existing sidewalks nearby X
Shoulders
Property impacts
Drainage/utility/environmental impacts
147
DOVER BICYCLE AND PEDESTRIAN PLAN ׀120
Page 148
Item 4.
White Oak Road
Project Type: Bicycle Facility
New Project
29
Project Description: Provide low-stress bicycle facilities along White Oak Road between US 13 and Garrison
Oak Drive.
Project Justification: White Oak Road is classified as LTS 3 and 4 throughout its length. This project will provide
a connected bicycle network on the east side of Dover, connecting neighborhoods to area resources
including Dover Park, commercial destinations, and area transit.
Connections to the Low-Stress Network: Connects to the proposed bicycle facilities on Kings Highway NE in the
west and low-stress neighborhood streets in the north and south.
Recommendation: Provide low-stress bicycle facilities along White Oak Road between US 13 and Garrison
Oak Drive.
Prioritization Criteria Presence
Bus stop X
Commercial activity X
Community center
Recreational facility X
School
High density community X
Existing sidewalks nearby X
Shoulders X
Property impacts
Drainage/utility/environmental impacts
148
DOVER BICYCLE AND PEDESTRIAN PLAN ׀121
Page 149
Item 4.
Plan Implementation
Goals and objectives should be tracked and implemented by the City of Dover with support from the
Dover/Kent County MPO and DelDOT. Physical projects recommended in this plan should be considered
by the Dover/Kent County MPO. The City of Dover Safety Advisory and Transportation Committee meets
monthly and advises City Council on issues concerning the Dover transportation network, including
pedestrian and bicycle infrastructure. Those meetings are open to the public.
PROJECT PRIORITIZATION
High priority projects will be evaluated by the process proposed by the Blueprint for a Bicycle-Friendly
Delaware for funding. Per the Blueprint Plan:
The prioritization process is designed to support local priorities, select implementable projects,
and create complete networks through the process documented in the Local Bicycle
Network and Project Planning section of the Blueprint Toolkit.
Based on local planning priorities, WILMAPCO, the Dover/Kent County MPO, and Sussex
County will each submit three to five priority projects to DelDOT. If a regional agency submits
more projects, they will be asked to prioritize those projects into tiers. This ranking will be taken
into account by DelDOT.
The next step is to ensure that projects are implementable. To this end, DelDOT conducts an
initial feasibility screening for select projects and screens out projects that are infeasible due
to right-of-way acquisitions, utilities, environmental considerations, and other issues that may
lead to excessive expense or approval challenges. For more details on the first and second
steps, see the Local Planning Process document.
Feedback received at the first public workshop identified the completion of the Senator Bikeway
and project number 3, Mifflin Road Multi-Modal Improvements, as high priority. The second review of
the document by the public during the fall of 2020 supported those two high priority designations,
identifying the following four recommendations as high priority:
• Project number 1, E. Division Street Connector
• Project number 2, Mifflin Road Multi-Modal Improvements
• Project number 5, Senator Bikeway Phase II
• Project number 19, Kings Highway NE
These projects should be submitted for consideration to the Dover/Kent County MPO.
149
DOVER BICYCLE AND PEDESTRIAN PLAN ׀122
Page 150
Table 10. Index of recommended projects Item 4.
Number Project Type Priority
1 (p. 88) E. Division Street Connector (Park Drive to Bayard Avenue) Shared Use Pathway
2 (p. 89) E. Division Street/North Little Creek Road (US 13 to SR 1) Complete Street
Mifflin Road Multi-Modal Improvements (Hazlettville Road to
3 (p. 90) Complete Street
Forrest Avenue)
4 (p. 91) MLK Boulevard Connector (Bay Road to US 13) Shared Use Pathway
Senator Bikeway Phase II (Forrest Avenue, Dover High
5 (p. 92) Shared Use Pathway
School to Mifflin Road)
South Bay Road Pathway (South Little Creek Road to
6 (p. 93) Shared Use Pathway
Transportation Circle)
7 (p. 94) St. Jones River Trail (west side) Trail
8 (p. 98) College Road Pedestrian Crossing Pedestrian Crossing
9 (p. 99) College Road Sidewalks (east of McKee Road) New Sidewalks
10 (p. 100) Forest Street (Lincoln Street to S. West Street) New Sidewalks
11 (p. 101) North State Street (Silver Lake to US 13) New Sidewalks
Pennsylvania Avenue Sidewalks (Division Street to Kings
12 (p. 102) New Sidewalks
Highway)
S. Dupont Highway (Public Safety Blvd. to South State
13 (p. 103) New Sidewalks
Street)
14 (p. 104) S. Little Creek Road (east of Roberta Avenue) New Sidewalks
15 (p. 105) W. Division Street (Ridgely Street to S. West Street) New Sidewalks
16 (p. 108) Bank Lane and The Green (S. West Street to MLK Boulevard) Wayfinding
17 (p. 109) College Road (McKee Road to US 13) Bicycle Facility
18 (p. 110) Kenton Road (Chestnut Grove Road to Denneys Road) Bicycle Facility
19 (p. 111) Kings Highway NE (E. Division Street to US 13) Bicycle Facility
Lakewood Place/N. New Street/S. New Street/Monroe
20 (p. 112) Study/Wayfinding
Terrace Bike Boulevard
21 (p. 113) New Burton Road (POW/MIA Parkway to S. West Street) Bicycle Facility
22 (p. 114) North Little Creek Road (SR 1 to SR 9) Bicycle Facility
23 (p. 115) North State Street and US 13 Intersection Bicycle Facility
24 (p. 116) South Little Creek Road (Bay Road to Fox Road) Bicycle Facility
25 (p. 117) South State Street Bicycle Facility
26 (p. 118) Walker Road East (North State Street to Saulsbury Road) Bicycle Facility
27 (p. 119) Walker Road West (Saulsbury Road to Kenton Road) Bicycle Facility
28 (p. 120) US 13 Commercial District Bicycle Boulevard Wayfinding
29 (p. 121) White Oak Road (US 13 to Garrison Oak Drive) Bicycle Facility
150
DOVER BICYCLE AND PEDESTRIAN PLAN ׀123
Page 151
Item 4.
151
DOVER BICYCLE AND PEDESTRIAN PLAN ׀124
Page 152
6. APPENDICES
Item 4.
152
DOVER BICYCLE AND PEDESTRIAN PLAN ׀125
Page 153
Item 4.
Walkable Communities Report Card
153
DOVER BICYCLE AND PEDESTRIAN PLAN ׀126
Page 154
Item 4.
154
DOVER BICYCLE AND PEDESTRIAN PLAN ׀127
Page 155
Item 4.
155
DOVER BICYCLE AND PEDESTRIAN PLAN ׀128
Page 156
Item 4.
156
DOVER BICYCLE AND PEDESTRIAN PLAN ׀129
Page 157
Item 4.
157
DOVER BICYCLE AND PEDESTRIAN PLAN ׀130
Page 158
Item 4.
Bicycle Friendly Community Report Card
158
DOVER BICYCLE AND PEDESTRIAN PLAN ׀131
Page 159
Item 4.
159
DOVER BICYCLE AND PEDESTRIAN PLAN ׀132
Page 161
Item 4.
Projects for All Users
Projects for all users are projects that include infrastructure for both people who walk and people who ride
bikes. Some projects are trail or pathway projects, but some are projects that call for both sidewalks and
on-road bicycle infrastructure, which are described as “Complete Street” projects. Projects below are
ordered alphabetically, not in order of priority.
Table 7. Projects for all users
Number Project Description Type
1 E. Division Street Complete the shared use pathway Shared Use Pathway
Connector (Park Drive to on the north side of E. Division Street
Bayard Avenue) between Park Drive and Bayard
Avenue.
2 E. Division Street/North Construct sidewalks and redesign the Complete Street
Little Creek Road (US 13 roadway to provide low-stress
to SR 1) bicycle and pedestrian travel along
SR 8 between US 13 and SR 1 and
address bicycle navigation through
the US 13 intersection.
3 Mifflin Road Multi-Modal Provide for low-stress bicycle and Complete Street
Improvements pedestrian access along Mifflin Road
(Hazlettville Road to between Hazlettville Road and
Forrest Avenue) Forrest Avenue.
4 MLK Boulevard Widen the existing sidewalk along Shared Use Pathway
Connector (Bay Road to MLK Boulevard between Bay Road
US 13) and US 13 to provide a shared use
pathway.
5 Senator Bikeway Phase II Construct a shared use pathway on Shared Use Pathway
(Forrest Avenue, Dover the south side of Forrest Avenue from
High School to Mifflin Mifflin Road to Dover High School.
Road)
6 South Bay Road Pathway Provide a shared use pathway along Shared Use Pathway
(South Little Creek Road the south side of Bay Road between
to Transportation Circle) South Little Creek Road and
Transportation Circle.
7 St. Jones River Trail Provide a new trail on the west side Shared Use Pathway
of the St. Jones River between Silver
Lake Park and Legislative Avenue. A
trail crossing will be necessary at
Division Street.
161
DOVER BICYCLE AND PEDESTRIAN PLAN ׀86
Page 162
Item 4.
Figure 36. Map showing locations of projects for all users
162
DOVER BICYCLE AND PEDESTRIAN PLAN ׀87
Page 163
Item 4.
Walking Projects
Table 8. Walking projects
Number Project Description Type
8 College Road Pedestrian Implement a pedestrian crosswalk Pedestrian Crossing
Crossing on College Road between Jason
Court and Delaware State University.
9 College Road Sidewalks Construct sidewalks to fill the gap on New Sidewalks
(east of McKee Road) the north side of College Road east
of the McKee Road intersection.
10 Forest Street (Lincoln Construct sidewalks on the north New Sidewalks
Street to S. West Street) and south sides of Forest Street
between Lincoln Street and US 13.
11 North State Street (Silver Construct sidewalks to fill gaps along New Sidewalks
Lake to US 13) the northbound side of North State
Street.
12 Pennsylvania Avenue Construct sidewalks on the west side New Sidewalks
Sidewalks (Division Street of Pennsylvania Avenue between
to Kings Highway) Division Street and Kings Highway.
13 S. Dupont Highway Construct sidewalks on the west side New Sidewalks
(Public Safety Boulevard of US 13 between River Road and
to South State Street) Webbs Lane, and the east side of US
13 between Laurel Drive and the
Capitol One Diner, and from
Roosevelt Avenue to S. State Street.
14 S. Little Creek Road (east Construct sidewalks to fill in the gap New Sidewalks
of Roberta Avenue) in the sidewalk along South Little
Creek Road.
15 W. Division Street (Ridgely Fill the gap in the sidewalk on the New Sidewalks
Street to S. West Street) south side of W. Division Street west of
S. West Street.
163
DOVER BICYCLE AND PEDESTRIAN PLAN ׀96
Page 164
Item 4.
12
Walking Projects
Railway
Parks and Open Spaces
Dover City Limits
Figure 37. Map showing locations of walking projects
164
DOVER BICYCLE AND PEDESTRIAN PLAN ׀97
Page 165
Item 4.
Bicycling Projects
Table 9. Bicycling projects
Number Project Recommendation Type
16 Bank Lane and The Green Install wayfinding marking and Wayfinding Marking
(S. West Street to MLK signage to highlight the low-stress & Signage
Boulevard) route along Bank Lane between
West Street to MLK Boulevard.
17 College Road East Provide low-stress bicycle facilities Bicycle Facility
(McKee Road to US 13) along College Road between
McKee Road and US 13.
18 Kenton Road (Chestnut Provide low-stress bicycle facilities Bicycle Facility
Grove Road to Denneys along Kenton Road between
Road) Chestnut Grove Road and Denneys
Road.
19 Kings Highway NE (E. Provide low-stress bicycle facilities Bicycle Facility
Division Street to US 13) along Kings Highway NE between E.
Division Street and US 13.
20 Lakewood Place/N. New Explore the viability of a north-south Study/Wayfinding
Street/S. New bicycle boulevard through Marking & Signage
Street/Monroe Terrace downtown Dover along Lakewood
Bike Boulevard Place/New Street/Monroe Terrace.
21 New Burton Road Evaluate New Burton Road for Study
(POW/MIA Parkway to S. bicycle improvements.
West Street)
22 North Little Creek Road Provide low-stress bicycle facilities Bicycle Facility
(SR 1 to SR 9) along north Little Creek Road
between SR 1 and SR 9.
23 North State Street and US Improve the approaches and the Bicycle Facility
13 Intersection intersection of N. State Street and US
13 to accommodate bicycle travel.
24 South Little Creek Road Provide low-stress bicycle facilities Bicycle Facility
(Bay Road to Fox Road) along South Little Creek Road between
Bay Road and Fox Road.
25 South State Street (Lotus Provide low-stress bicycle facilities Bicycle facility
Street to US 13) along South State Street between
Lotus Street and the south side of the
intersection with US 13.
26 Walker Road East (North Provide low-stress bicycle facilities Bicycle Facility
State Street to Saulsbury along Walker Road between N. State
Road) Street and Saulsbury Road.
27 Walker Road West Provide low-stress bicycle facilities Bicycle Facility
(Saulsbury Road to along Walker Road between
Kenton Road) Saulsbury Road and Kenton Road.
28 US 13 Commercial District Install wayfinding marking and Wayfinding Marking
Bicycle Boulevard signage to highlight the low-stress & Signage
route between Leipsic Road and
Dover Mall.
29 White Oak Road (US 13 to Provide low-stress bicycle facilities Bike Facility
Garrison Oak Drive) along White Oak Road between US 13
and Garrison Oak Drive.
165
DOVER BICYCLE AND PEDESTRIAN PLAN ׀106
Page 166
Item 4.
Figure 38. Map showing locations of bicycling projects
166
DOVER BICYCLE AND PEDESTRIAN PLAN ׀107