Page 1
UTILITY COMMITTEE
AGENDA
JANUARY 14, 2013 - 5:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER , DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate
times. When possible, please notify the City Clerk (736-7008 or e-mail at
CityClerk@dover.de.us) should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Request for Alley Abandonment (paper) - 971 and 975 Forest Street
2. TEA/NAES Report (October)
3. Update - Garrison Oak Technical Park Project
4. Adjournment by 5:25 P.M.
/tm
S:\AGENDAS-MINUTES-PACKETS\Committee-Agendas\2013\01-14-2013 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
ACTION FORM
PROCEEDING: Utility Committee AGENDA ITEM:
DEPARTMENT OF ORIGIN: Public Works DATE SUBMITTED: 1/9/2013
PREPARED BY: Sharon J. Duca, P.E., Public Works Director / City Engineer
SUBJECT: Request for Alley Abandonment (paper) to 971 and 975 Forest Street
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: City Manager
EXHIBITS: Attachment A – Map
EXPENDITURE REQUIRED: $ N/A AMOUNT BUDGETED: $ N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: The references alley shall be abandoned upon approval by City Council.
RECOMMENDED ACTION: Abandonment of the subject alley with conveyance to 971 and 975 Forest Street
currently owned by Faithwork LLC.
BACKGROUND AND ANALYSIS
The City Clerk’s Office received a letter from Mr. Tolano D. Anderson, dated November 21, 2012, requesting
that the unimproved alley located approximately 150 feet north of Forest Street from the intersection of
Carver Road, be abandoned. Mr. Anderson states that the alley condition as well as an inability to safely
utilize the space creates a significant hardship. Mr. Anderson also stated that he owns all real property
abutting the alley and requests that the alley be conveyed to 971 and 975 Forest Street.
Public Works staff has confirmed that the alley is unimproved. No public utility easements will be required.
Records indicate that all abutting parcels are owned by Faithwork LLC. In light of the information provided the
Department of Public Works has no objection to the abandonment of the subject alley and recommends
conveyance of the same to the parcels represented by 971 and 975 Forest Street. Conveyance shall be in
proportions complimentary to the existing lot widths of these parcels.
It should be noted that 983 Forest Street appears to utilize the unimproved alley for access. As this parcel is
also owned by Faithwork LLC, it is recommended that the owner establish cross access easements between
971, 975 and 983 Forest Street at the time of conveyance.
Page 3
Alley Adjacent to 971 & 975 Forest Street
Proposed Alley Abandonment
34
33
30
.
!
.
! 65
27
20
21 ×
951
Carver Rd
955
991 983
987 975 971
.
!
×
.
!
!
.
Forest St
.
!
0 45 90 180 Feet
¯
Legend
Date Printed: January 7, 2013
§Ò
! × Hydrants
File: m:\gis_data\projects/tech_mxds
Overhead Electric Pole
. Manholes
!
\st_abandonment_map Underground Electric Lines
Sewer Line
Department: Public Works GIS Overhead Electric Lines
Right of Way to be Abandoned
City of Dover, Delaware Water Main Dover Parcels
Hydrant Line
Page 7
The Energy Authority, Inc.
Monthly Management Committee Update – October 2012
November 30, 2012
Prepared by:
Jamie Mahne
Vice President, Client Services
904.360.1374
jmahne@teainc.org
Page 8
TABLE OF CONTENTS
I. Executive Summary 1
II. Budget Report 11
III. Operations Management 14
IV. Appendix 27
i
Page 9
I. Executive Summary
A. Power Supply Summary:
Overall Power Supply costs were $630,604 under budget due to lower PJM fees for RT
Energy.
Dover’s budgeted cost for all power supply (capacity AND energy) was $91.98/MWh.
The actual cost of all power supply (capacity AND energy) was $84.68/MWh.
The cost of energy alone was $58.22/MWh, versus a budgeted energy cost of $67.85.
The primary driver in the difference was the cost of unhedged energy. The city budgeted
unhedged energy and PJM charges at $78/MWh. The actual cost of unhedged energy and
PJM charges was $34/MWh – this decrease was due to lower PJM costs in the real time.
Dover’s hedge purchases totaled 46,450MWh, which was 79% of the projected load and
82% of the actual load.
Dover’s power purchases from hedge transactions totaled $2,897,450. Purchases from
PJM (energy and fees) totaled $783,034, with DA Energy purchases totaling $583,266
and Balancing Spot Market Energy totaling a credit of $268,454.
Dover’s total load was 56,736 MWh versus a forecasted load of 59,094 MWh.
Dover’s planned energy purchase from the SunPark solar installation was 1,250MWh.
Dover’s actual energy purchase from the SunPark installation was 1,021 MWh.
1
Page 10
Supply Source Summary:
Supply Variance:
Budget Actual Variance
Gross Load 59,094 56,736 2,358
Wholesale Load 57,844 55,715 2,129
Hedged Volume (MWh) 46,450 46,450 -
Unhedged Volume (MWh) 11,394 9,265 2,129
Dover SunPark Volume (MWh) 1,250 1,021 229
Renewable Energy Credits Volume 188 252 (65)
Hedged Cost ($/MWh) $ 65 $ 62 0
Unhedged Energy Cost ($/MWh) $ 78 $ 34 $ 44
Solar Energy Cost ($/MWh) $ 83 $ 86 $ (3)
Energy Costs ($/MWh) $67.85 $58.22 $9.62
All-in Costs - Energy, Capacity and RECs ($/MWh)
$91.98 $84.68 $7.29
2
Page 11
B. Generation Summary:
Generation Revenue FY2012-13
$1,600,000
$1,400,000
$1,200,000
$1,000,000
$800,000
$600,000
$400,000
$200,000
$-
Jul-12 Aug-12Sep-12 Oct-12 Nov- Dec-12 Jan-13 Feb-13 Mar- Apr-13 May- Jun-13
12 13 13
Budget Actual
Dover did not generate any electricity in the month. Net generation revenue was
$856,293 vs. a budget of $884,459. This delta was mainly due to higher than budgeted
O&M costs.
3
Page 12
Generation Breakdown:
City of Dover's Wholesale Generation
Net Generation Mwh 0.00
All In Generation Margin
PJM Bill Energy $ -
PJM Capacity $ 1,205,977.50
Black Start, Reactive Credit, DASR & EFORp $ 36,373.16
Gas Purchases $ -
Oil Purchases $ -
Transport / Cash Out $ -
Gross Margin $ 1,242,350.66
Production Margin
Generation Production Revenues (PJM) $ -
Gas Purchases $ -
Oil Purchases $ -
Transport / Cash Out $ -
Gross Production Margin $ -
$/Mwh All In Generation Margin $ -
$/Mwh Generation Production Margin $ -
4
Page 13
Fuel Purchases:
There were no fuel purchases in the month.
Transportation and Imbalance:
There were no fuel transportation charges in the month.
5
Page 14
C. Emissions Summary:
Emissions Allowance Summary through October 31, 2012
CAIR EMISSION ALLOWANCE SUMMARY
SO2 NOx Allowances1
Date Action
Allowances Seasonal Annual
1/1/09 2008 Carryover 3,240 0 0
1/1/09 2009 Allocation 2,723 53 80
2/1/10 2010 Allocation 2,039 50 78
1/1/11 2011 Allocation 1,988 49 78
4/1/11 2011 Reallocation 2 4
1/11/12 2012 Allocation 1,988 51 80
9/29/09 SO2 Sales (1,500)
11/12/09 NOx Ann. Sales (45)
11/13/09 SO2 Sales (1,410)
11/20/09 NOx Seas. Sales (25)
12/31/09 2009 Emissions2 (1) (6) (13)
12/31/10 2010 Emissions 0 (54) (54)
10/31/10 EPA Linearity Testing Req. (68) (68)
2011 2010 Deficit NOx Purchases 53 22
Aug 2011 Revised 2010 ECMPS data 30 30
Nov 2011 NOx Seas. Sales (DEMEC) (1)
12/31/11 2011 Emissions2 (1) (32) (36)
10/31/12 2012 Emissions2 (1) (37) (37)
TOTAL ALLOWANCES 9,065 65 118
On August 21, 2012, the U.S. District Court of Appeals (DCA) in Washington vacated
EPA’s “Transport Rule” (aka Cross State Air Pollution Rule or CSAPR) which would
have become effect on January 1, 2012. Additionally, DCA said EPA must continue
administering the Clean Air Interstate Rule (CAIR), CSAPR’s predecessor, pending the
issuance of a valid replacement rule. EPA submitted a petition for an en banc rehearing to
the DCA on October 5, 2012 and is awaiting a ruling on the petition.
Market liquidity for CAIR allowances continues to be low, with few transactions
occurring. The following table shows estimated values as of November 30, 2012, based
on broker bids & offers:
1
Per CAIR, starting in 2009, NOx emissions are governed by a seasonal and annual program.
2
Under CAIR, pre-CAIR SO2 allowances are retired at a rate of 2 allowances for each ton emitted. It is
assumed that pre-CAIR allowances will be retired before CAIR allowances.
6
Page 15
Mark-to-Market for CAIR Allowances (9/24/2012)
Commodity $/Ton Tons Extended Value
SO2 Allowances $ 0.75 9,065 $ 6,799
NOx Allowances - Seasonal $27.50 65 1,787
NOx Allowances - Annual $40.00 118 4,720
TOTAL $13,306
Regional Greenhouse Gas Initiative
The State of Delaware is a participant in the Regional Greenhouse Gas Initiative (RGGI).
The City of Dover must comply with RGGI by surrendering carbon dioxide (CO2)
allowances pursuant to the State of Delaware’s laws (Title 7, Chapter 60, Sub-Title II-A).
Delaware has elected a combined emissions allowance allocation/auction mechanism for
RGGI, in which 40% of CO2 allowances were allocated to sources for 2009, declining by
8% per year so that by 2014, all CO2 allowances are auctioned.
Dover has had more than a sufficient number of RGGI allowances allocated to it to cover
its requirements through the first compliance period (calendar years 2009-2011). Any
unused allowances are carried over (“banked”) for subsequent years. The cumulative
balance of unused RGGI allowances held by Dover were 92,712 tons as of the end of
Calendar year 2011, as shown in the table below. During the months of June - October,
2012, Dover’s generating units produced 15,265 tons of CO2 emissions, thus reducing the
amount available in the allowance bank.
CO2 Allowance Summary (10/31/2012)
1 2 3 4 5 6 7 8
CO2 Allowances
Available Annual
CO2 CO2 (Per Facility, Allocated Cumulative
CO2 Tons CO2
Allowance Allowances Prior to Sale) CO2
Vintage Sold YTD Allowances
Emitted Allowance Balance
McKee Balance
VanSant
Run
2009 0 60,128 2,056 62,184 (5,796) 56,388 56,388
2010 0 48,102 1,645 49,747 (32,971) 16,776 73,164
2011 0 36,077 1,234 37,311 (17,763) 19,548 92,712
2012 0 27,058 925 27,983 ( 15,265) 11,793 104,505
3
2013 0 15,032 514 15,546 - 15,546 120,836
3
2013 allocations have not been added to Dover’s RGGI COATS account. These are listed for the purpose
of showing the last expected allocation of RGGI allowances.
7
Page 16
The table shows that the “Allocated CO2 Allowances” (column 5) are declining; after 2013,
Dover will no longer receive allocations of RGGI allowances. Actual CO2 emissions
(column 6) have varied from 5,796 tons in 2009 to 32,971 tons in 2010. The Cumulative
Balance (column 8) – aka “Banked Allowances”) can be utilized for generation in future
years. Once the banked allowances have been fully utilized, Dover will be required to
purchase allowances through the periodic RGGI auctions or through over-the-counter
markets. Assuming that Dover does not sell any banked allowances, it will be able to
maintain a positive balance through 2016 – 2025, depending on actual annual energy
production in 2012 and beyond.
RGGI auction and spot prices have remained in the $1.92 - $2.05/ton range. The most
recent RGGI auction occurred on September 5, 2012 and the auction cleared at $1.93/ton.
Based on this auction, the value of Dover’s existing RGGI allowance bank (104,505 tons)
is approximately $201,695 (excluding allocations for 2013 which have not yet been
allocated).
RGGI’s next auction is scheduled for December 5, 2012.
RGGI is currently conducting a program review pursuant to the original RGGI
memorandum of understanding between participating states. As a result of these
activities, coupled with declining allocations, TEA believes that there is a reasonable
expectation that RGGI market prices could increase over the next few years.
Dover could elect to sell all or a portion of its banked allowances now and re-acquire
allowances at a later date; however TEA is currently of the opinion that Dover will be
better off retaining its banked allowances for use during future compliance years.
Renewable Energy Certificates
Dover owns two photovoltaic systems totaling 15 kW, consisting of (a 5 kW unit at the
Utilities Administration Building and two 5 kW units at the McKee Run generating
station. The output has been recorded on PJM’s Generation Attribute Tracking System
(GATS), resulting in a balance of 43 Solar Renewable Energy Certificates (SRECS).
Additionally, Dover receives solar energy produced by the 10 MW Dover Sun Park
which is owned by White Oak Solar Energy, LLC. In addition to the all of the physical
energy produced by the Sun Park, Dover receives 15% of Sun Park’s SRECS. Through
the end of September, 2012, Dover has accumulated a total of 3,566 SRECS from this
contract. These SRECS have also been recorded in Dover’s GATS account.
Given the current SREC market structure, combined with the impact of the Sun Park and
other facilities coming on-line in 2011, Dover’s ability to remarket excess SRECs
presents unique challenges. Market price for Delaware SRECs from the September 2012
8
Page 17
auction was $40/MWh, resulting in a market value of $144,360 for Dover’s 3,609
SRECs.
It should be noted, however, that the nearest viable market for Dover’s SRECs is
Pennsylvania which has market price mid-point of $20, half of the price from the most
recent Delaware auction price.
TEA is recommending that Dover retain these allowances for compliance with its
Renewable Portfolio Standard which we understand DEMEC is working on. Once Dover
has an approved RPS in place, it may be required to retire a portion of its current SREC
balance for compliance in the 2012/13 future compliance year. Any remaining SRECs
could be used for the 2013/14 compliance year.
D. Operations Management Summary:
During the month of October, there were no reportable or lost time accidents or injuries.
The facility has now gone 748 days without an OSHA recordable accident and 748
consecutive days without a lost time reportable accident. There were zero Environmental
Notices of Violations issued. There were no Near Miss incidents. All Units were in
Planned outages during the month.
Monthly Budget Variance - The actual expenses attributable to O&M of the two sites for
the month of October were $386,058. The actual expenses are $28,959 or 8.11% over the
approved budget of $357,099. The principal reasons for the unfavorable variance were
due to higher electric, water and chemical usage, contractual services, and home office
support needed due to the Admin Manager vacancy.
9
Page 18
E. Risk Management Summary:
Forward power prices in PJM have risen slightly since last month resulting in a higher
blended cost.
The current projected cost of service is below:
Power Year Hedge Ratio Blended Cost
($/MWh)
2012-13 80% $61.56
2013-14 46% $52.00
2014-15 27% $48.32
2015-16 14% $47.63
10
Page 19
II. Budget Report
Variance Report:
Budget Actual Variance
Oct-12 Oct-12
Gross Load Forecast 59,094 56,736 2,358
Power Supply
Hedged Energy $3,013,494 $2,897,450 $116,044
PJM- Energy $883,650 $314,812 $568,838
PJM - Transmission and Fees $313,000 $468,221 ($155,221)
Dover SUN Park Energy $112,094 $90,971 $21,123
Management Fees $83,000 $83,000 $0
Capacity UCAP Obligated Purchased $1,029,954 $950,133 $79,821
Subtotal - Power Supply $5,435,192 $4,804,587 $630,604
Power Generation O&M & Fixed Fuel
Plant O&M $357,099 $386,058 ($28,959)
Subtotal Generation O&M $357,099 $386,058 ($28,959)
Power Generation Production Margin
Economic and reliability dispatch $0 $0 $0
Fixed Fuel and Transport Charges $0 $0 $0
Subtotal Generation Production Margin $0 $0 $0
Power Generation Non-Production Revenue
Generation Capacity Credit ($1,205,978) ($1,205,978) ($1)
Emissions Allowance Sales $0 $0 $0
Black Start & Reactive Power Revenue ($35,580) ($36,373) $793
Subtotal - Non-Production Revenue ($1,241,558) ($1,242,351) $793
SubTotal - All Generation ($884,459) ($856,293) ($28,166)
Total - Utilities Cost $4,550,733 $3,948,295 $602,438
Unit Costs
Total - Power Supply $91.98 $84.68 $7.29
Total - Power Generation ($14.97) ($15.09) $0.13
Final Cost of Service to City of Dover Ratepayers $77.01 $69.59 $7.42
11
Page 20
Variance Analysis:
Power Supply
Dover consumed 2,358 MWh more than what was forecasted for the month.
PJM costs were lower than expected, but PJM’s fees were higher than forecast.
The net result was a net power supply cost of $84.68/MWh, $7.29/MWh lower
than budget.
For the month, the city realized a favorable variance of $630,604 for power
supply vs. the monthly budget.
Dover Sun Park generated 228 MWh less than what was forecasted.
Generation
Power generation had an unfavorable budget variance of $28,166.
Plant O&M expenses had an unfavorable budget variance of $28,959 for the
month.
12
Page 21
YTD Variance Report:
Budget Actual Variance
YTD YTD
Gross Load Forecast 272,123 280,196 (8,073)
Power Supply
Hedged Energy $14,718,667 $14,231,102 $487,565
PJM- Energy $5,229,658 $2,174,061 $3,055,597
PJM - Transmission and Fees $1,252,000 $2,642,628 ($1,390,628)
Dover SUN Park Energy $575,127 $594,880 ($19,753)
Management Fees $332,000 $332,000 $0
Capacity UCAP Obligated Purchased $4,086,591 $3,769,839 $316,752
Subtotal - Power Supply $26,194,043 $23,744,511 $2,449,532
Power Generation O&M & Fixed Fuel
Plant O&M $1,898,613 $1,864,068 $34,545
Subtotal Generation O&M $1,898,613 $1,864,068 $34,545
Power Generation Production Margin
Economic and reliability dispatch ($1,124,312) ($1,864,289) $739,977
Fixed Fuel and Transport Charges $586,004 $942,183 ($356,179)
Subtotal Generation Production Margin ($538,308) ($922,106) $383,798
Power Generation Non-Production Revenue
Generation Capacity Credit ($4,785,009) ($4,785,007) ($2)
Emissions Allowance Sales $0 $0 $0
Black Start & Reactive Power Revenue ($142,320) ($201,393) $59,073
Subtotal - Non-Production Revenue ($4,927,329) ($4,986,400) $59,071
SubTotal - All Generation ($3,567,024) ($4,044,437) $477,413
Total - Utilities Cost $22,627,019 $19,700,074 $2,926,945
Unit Costs
Total - Power Supply $96.02 $86.53 $9.49
Total - Power Generation ($13.30) ($14.41) $1.11
Final Cost of Service to City of Dover Ratepayers $82.72 $72.12 $10.60
13
Page 22
III. Operations Management
NAES Corporation
Dover, Delaware
October 2012
Monthly Report
Operator II, Mike Shane, is congratulated by Plant Manager, Vince Scire, for
successfully achieving his PJM Gen Ops System Certification.
14
Page 23
Table of Contents
1.0 Environmental, Health and Safety
2.0 Financial
3.0 Operations
4.0 Maintenance
5.0 CIP
6.0 General Plant Information
7.0 Summary of NAES Performance
15
Page 24
1.0 Environmental, Health and Safety:
During the month of October, there were no restricted work days or lost time accidents.
The facility has now gone two years and eighteen days (748 days total) through October
31, 2012 without an OSHA Recordable Accident or a Lost Time reportable accident.
The September DMR was submitted for the McKee Run site with no NPDES
exceedences.
The plant received no Notice of Violations (NOVs) during the month.
Work continues on the IWDP (wastewater) permit with Kent County. Quotes for
Mechanical work have been requested and will be evaluated once received with contract
award to follow thereafter.
Environmental, Health, and Safety Statistics
Month Fiscal Year to Date
(October) (7/1/12-9/30/12)
NOVs 0 0
Opacity Deviations 0 0
Environmental Deviations 0 7
OSHA Recordable 0 0
OSHA LTA's 0 0
First Aid cases 0 0
Restricted Workday Accident 0 0
Near Miss 0 2
Man Hours Worked 4,545.75 17,152.75
Date last OSHA Recordable 10/14/10
Date last Lost Time Accident 10/14/10
Days since last OSHA recordable 748
Days since last Lost Time Accident 748
Emissions (NOx & SO2) All data thru 10/31/12
NOx Summary – Ozone Season (May-Sep) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2009 0.9 0.7 4.2 0.6 6.4
2010 0.7 2.2 88.7 3.3 94.7
2011 1.8 1.5 31.4 1.4 36.1
2012 1.2 1.0 35.8 1.0 33.1
NOx Summary - Year (Jan-Dec) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2009 0.9 0.7 10.1 0.6 12.3
2010 0.7 2.2 88.7 3.3 94.7
2011 1.8 1.5 32.6 2.9 38.8
16
Page 25
SO2 Allowances Summary
SO2 Allowances Available Total SO2
2012 1.2SO2 1.0 Unit, Prior
(Per 35.8
to Sale & 1.0
Tons Emitted36.8 SO2
SO2 Allowance Allowances Reconciliation)
SO2 Summary - Year (Jan-Dec) Tons – Allowances
Vintage
Year Sold -
Unit #1YTD Unit #2 Unit #3 UnitU3
#11and U11TOTAL Balance
Unit #3 Unit #11 YTD
2009 0.05 0.05 0.1 0.2 0.4
2010 and earlier 0 4815 276 0 5089
20112010 0.0 0 0.01850 0.3 138 0.0 1 0.3 1988*
20122011 0.0 0 0.01850 0.1 138 0.5 1 0.6 1988*
*Note – Emissions
2012 allowances
0.0are deducted0.0
according to 0.0
oldest vintage0.1
first or unless0.1
otherwise
directed.
CO2 Allowances Summary*
CO2 CO2 CO2 Allowances Available Total CO2 CO2
Allowance Allowances (Per Facility, Prior to Tons Emitted Allowance
Vintage Sold YTD Sale) Balance
McKee Run VanSant
2009 0 60,128 2,056 5,796 56,388
2010 0 48,102 1,645 32,971 16,776
2011 0 36,077 1,234 17,763 19,548
2012 0 27,058 925 15,265 11,793
2013 0 15,032 514 0 15,546
Note: All CO2 allowance values are provided by the RGGI CO2 Allowance Tracking
System.
CAIR NOx Allowances Summary*
NOx Allowances
CAIR CAIR NOx Available Total NOx NOx Allowance Balance
CAIR NOx
NOx Allowances (Per Facility, Prior to Tons Emitted
Allowances
Allowance Sold YTD Sale) (Yr/ Season)
Purchased
Vintage McKee McKee
VanSant YTD VanSant
Run McKee Run - Run
(Yr/Season) (Yr/Season)
(Yr/Season) VanSant (Yr/Season)
2010 and
1 29/30 0/2
earlier
2011 0 77#/48# 5/3 33/31– 3/1 0/0 - 0/0 44#/17# 2/2
2012 0 75/48 5/3 36/36 – 1/1 0/0 - 0/0 39/12 4/2
*Note – Emissions allowances are deducted according to oldest vintage first or unless otherwise directed.
17
Page 26
2.0 Financial
Financial – Current Month
Month – October
Actual Budget Variance
Personnel 231,087 239,870 8,783
Materials & Supplies 26,429 7,557 (18,872)
Administrative Expenses 128,542 109,672 (18,870)
Total $386,058 $357,099 ($28,959)
Financial – Fiscal Year to Date
Number of Months – 4
Actual Budget Variance
Personnel 921,631 966,946 45,315
Materials & Supplies 111,132 122,128 10,996
Administrative Expenses 831,305 809,539 (21,766)
Total 1,864,068 1,898,613 $34,545
2.1 Variance analysis:
The City of Dover Finance Department has closed the books for the month of October. The
expenses for October are $386,058 against a budgeted amount of $357,099 for an unfavorable
variance of $28,959 or ≈ 8.11%. The variance was due to the following:
PERSONNEL EXPENSES – A favorable monthly variance of $8,783 was to due to having
vacant positions and lower overtime costs due to lack of unit operation in October due to the
units being in outage.
MATERIALS AND SUPPLIES EXPENSES- An unfavorable monthly variance of $18,872
was due to higher than budgeted Water-Sewer and Water Treatment Chemicals expenses caused
by higher than budgeted unit operations in September.
ADMINISTRATIVE EXPENSES – An unfavorable monthly variance of $18,870 was due to
higher Electricity, Contractual Services, and Home Office Labor expenses than budgeted.
Expenses in Contractual Services increased due to a reclassification of expenses for the Unit #3
DCS Computer and Software annual maintenance agreement. These costs were originally
included in CIP EG1204. Home Office Labor costs were higher than budgeted due primarily to
increased corporate HR support of the vacant positions and corporate safety support to conduct an
onsite audit of the plant’s safety programs.
The budget is currently forecasted to finish this fiscal year at $5,899,313 expensed versus a
budget of $5,914,900 thereby realizing a 99.57% expenditure rate.
18
Page 27
3.0 Operations
Unit Operations / Outages / Trips
On October 1, 2012 at 0700 hours, all four of the City of Dover units went into a planned
fall outage. A number of maintenance activities were planned some of which have
already been completed (see maintenance section) and some that will require Operations
support.
Month October 2012
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0.0 0.0 0.0 0.0 0.0 0.0
Starts # 0 0 0 0 0 6
Gross Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Net Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Total Auxiliaries MWh 21.729 21.729 118.987 162.445 2.687 165.132
Auxiliaries purchased MWh 21.729 21.729 118.987 162.445 2.687 165.132
Fuel Gas Used MMBTU 0.0 0.0 32,135.709 32,135.709 0.0 32,135.709
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 0.0 0.0
Total Fuel MMBTU 0.0 0.0 32,135.709 32,135.709 0.0 32,135.709
Net Heat Rate BTU/KWh 0.0 0.0 11,826 11,826 0.0 11,826
Unit Trips # 0 0 1 1 0 1
Capacity Factor % 0.0 0.0 0.0 0.0 0.0 0.0
Availability Factor % 0.94 0.94 0.94 0.94 0.94 0.94
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 737.000 737.000 737.000 2,211.000 737.000 2,948.000
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Reserve Shutdown
Hours 7.00 7.00 7.00 21.000 7.00 28.000
Hours
HW Boiler Gas Usage MMBTU 0 0
Pilot Gas Usage MMBTU 0 0 0 0
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from
fuel flow instruments.
19
Page 28
2011-2012 Fiscal Year-to-Date October
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 92.782 71.970 285.597 450.349 22.066 472.415
Starts # 2 2 26 30 4 34
Gross Generation MWh 643.317 582.202 18,797.488 20,023.007 714.818 20,737.825
Net Generation MWh 604.005 541.673 17,317.513 18,463.191 714.287 19,177.478
Total Auxiliaries MWh 146.202 147.419 2,337.717 2,631.338 6.681 2,638.019
Auxiliaries purchased MWh 106.89 106.89 857.742 1,072.522 6.15 1,077.672
Fuel Gas Used MMBTU 9,072.980 8,108.898 199,166.724 216,348.602 8,429.434 224,778.036
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 112.567 112.567
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 5,806 5,806
Total Fuel MMBTU 9,072.980 8,108.898 199,166.724 216,348.602 8,542.001 224,890.603
Net Heat Rate BTU/KWh 15,021 14,970 11.826 13,939 12,604 13,271
Unit Trips # 0 0 1 1 0 1
Capacity Factor % 0.40 0.36 2.35 1.86 0.28 1.67
Availability Factor % 74.85 74.85 74.85 74.85 75.94 75.12
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 737 737 737 2211 737 2948
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Reserve Shutdown
Hours 2,122.218 2,143.030 1,929.570 6,194.818 2,192.934 8,387.752
Hours
HW Boiler Gas Usage MMBTU 0 0
Pilot Gas Usage MMBTU 784 898.663 1,682.663 1,682.663
Fuel Oil Inventory
Monthly Monthly Fuel Monthly FY 12-13 Fuel FY 12-13
Inventory Inventory Purchases Inventory Inventory Purchases Inventory
(Start) (End) (Month) (Change) (Start) (YTD) (Change)
McKee Run
(#2 Fuel Oil) 455,169 454,725 0 (444) 454,725 0 444
VanSant
146,301 145,711 0 (590) 152,150 0 (6,439)
(#2 Fuel Oil)
Note: As measured by tank level instruments. Tank levels may change due to oil temperature.
20
Page 29
VanSant Lifetime through 10/31//12
Actual Starts Factored Starts Fired Hours
VanSant 1303 2230.45 4215.86
Since HGP - Dec 2004 229 566.05 832.28
Capacity Testing – FY 2012-2013
Summer 2012 (June 1- Aug 31) Winter 2012-2013 (Dec 1- Mar 1)
Unit Rated Net Reported Net Unit Rated Net Reported Net
Capability (MW) Capability (MW) Capability (MW) Capability (MW)
1 17 17.0 1 17 *
2 17 17.3 2 17 *
3 102 102.7 3 102 *
VanSant 39 39.0 11 39 *
Total 175 176.0 Total 175 175
Note: * Denotes Unit is qualified for the PJM Winter Demonstration Period Exemption Program
Team Report:
Operations personnel continue to support maintenance by working on Preventative
Maintenance (PM) work orders and other work orders that they have the necessary skills
to successfully complete the task. The Operations Department continues to utilize the
Day Shift Workers in both Operations and Maintenance areas to help in maintaining the
plant.
Plant employees continue General Physics safety training and environmental courses to
enhance their overall knowledge of permit and safety requirements. As the GPI courses
are being completed the employee reviews the standard operating procedure (SMP) for
the same topic they are training on to review NAES policy and score a minimum 80% on
a quiz before they can complete the SMP.
21
Page 30
4.0 Maintenance
During the month of October, the Plant Maintenance staff continued addressing the
backlog of work orders and completing outage activities. There were thirty-eight work
orders issued with seventy-nine work orders being completed during the month. There
were no safety work orders entered into the plant’s Computerized Maintenance
Management System (MP2) during the month. The table below summarizes the monthly
work order activities.
Work Order Report
October - 2012
Outstanding
From Outstanding
Previous Issued This Completed at the end of
Priority # Month Month This Month the month
1 15 3 7 11
2 33 7 11 29
3 51 2 8 45
4 5 0 0 5
5 15 0 1 14
SW1 0 0 0 0
SW2 0 0 0 0
SW3 0 0 0 0
SW4 0 0 0 0
SW5 0 0 0 0
PM 65 26 52 39
Totals 184 38 79 143
Note: PMs are included in the priority totals
Notable activities during the month include:
1) The NAES Mechanical and IC&E staff started outage related work activities that
will aid in critical unit equipment to safe and reliable condition also maintaining
unit availability in the most cost effective manner. All work performed in
accordance with safe work practices and without impact to the environment.
2) XL Insurance Boiler Inspector, Mr. Charles Newman, was on site to inspect all
three units at McKee Run Generating Station. There were no issues to report
concerning Units 2 and 3. One minor concern occurred with Unit 1 regarding a
small amount of surface rust found in the steam drum. Plant staff is taking
proactive measures to eliminate this occurrence in the future by making slight
improvements to the unit’s layup procedure.
3) Siemens Engineering Represetative, Mr. Dave Doneti, was onsite to assist with
correcting the problem on the Unit 2 overspeed trip mechanism. In the discovery
portion of the job, it was determined that the overspeed pin would not hit the trip
arm. Siemens Engineering recommended milling down the flange face of the
overspeed trip mechanism housing to achieve the proper clearance for the trip
22
Page 31
arm. Machine work was completed at an offsite vendor shop and the overspeed
trip mechanism was reassembled and tested for proper operation. Testing could be
achieved with the unit not running and was found to be in correct working order.
Start up of the unit and final testing of the overspeed trip will be completed when
the unit is available for start up after all outage work has been completed.
Maintenance staff investigated mechanical concerns with 3B FD fan inboard
bearing overheating. Staff disassembled the coupling and bearing to inspect the
condition of both. This inspection revealed that the bearing and the coupling had
excessive wear. A new bearing was requisitioned from the warehouse and is being
installed, in accordance with the manufacture specification. Local manufactures
representative has been contacted and is working on getting the price, along with
availability of the new coupling. New coupling has been placed on order and will
be installed when received.
23
Page 32
5.0 Capital Improvement Projects (CIP)
Project
Description Update
Number
Units 1 & 2 Cooling Progress: The FY2013 work scope package being developed
EG1102
Tower Repairs Schedule: Work scheduled to be completed in the 4th quarter
Progress: Work scheduled for the Spring 2013 outage. Bid
Unit #3 Boiler document being developed. Completion at 5%.
EG1202
Systems Schedule: Bids to be obtained in 2nd quarter of 2012 and work to be
completed in the spring 2013 outage.
Progress: The FY2013 work scope package being developed.
Unit 3 Auxiliary Schedule: Some work is being performed on the Unit 3 Condenser
EG1203
System Components Drains and other work is scheduled to be complete in the spring
outage.
Progress: Long lead material requirements being developed for bid.
Work scope and specifications for generator work being finalized
Unit 3 Turbine
EG1212 and should be sent out in early to mid November.
Repairs
Schedule: Long lead items were identified in the 2nd quarter and
will be purchased in the 3rd and 4th quarters.
Progress: The FY2013 work scope package being developed
Units 1 & 2
EG1304 Schedule: Work to be completed during the spring outage
Components Repairs
Turbine Level Progress: The FY2013 work scope package being developed
EG1306 Window Schedule: Work to be completed during the 2ndquarter of 2013.
modification
Progress: Material has been purchased and delivered to the site at
the beginning of the outage. Contract has been awarded for both
Unit 3 Air Heater
EG1112 expansion joint replacement and for Unit 3 Condenser Drain Tree
Expansion Joint
replacement.
Schedule: The work is schedule to be completed in November.
Progress: Scope of work has changed since this project was
proposed as the stack inspection performed in spring of 2012
determined stack lining in worse condition than expected. Activities
in 2013 will be to develop repair scope and obtain bids for the work.
EG1309 Unit 3 Stack Repairs
This should be completed in the 2nd quarter.
Schedule: The scoping of work should be completed in the 3rd
quarter with bids and revised installation costs identified. Actual
repair work will be scheduled for 2014.
Progress: The FY2013 work scope package being developed.
Units 1&2 Stack
EG1310 Schedule: Work to be completed during the spring outage or
Repairs
deferred until 2014.
VanSant Capacity Progress: Valuation of the benefits of various technologies is
EG1311 underway. Final decision on moving forward with the project has
Increase
24
Page 33
still not been made.
Schedule: Installation was scheduled for the 4th quarter but is
dependent on favorable decision to move forward. At present time,
this cannot expect to be completed until late 2013, at the earliest.
Progress: Parts identification has started and installation bid package
Unit 3 Generator
EG1312 being developed. Expect to issue bids in the 2nd quarter.
Repairs
Schedule: Installation work to be completed in the 4th quarter.
Progress: Mechanical design is complete and electrical design is
approximately 95% complete and under review by plant staff.
MR Industrial Waste
EG1214 Quotes for Mechanical materials sent out to qualified bidders.
water System
Schedule: Installation work planned for the 2nd and 3rd quarter of
FY.
Progress: Work has begun on inspection and repair of seal and
Unit 1 Gland Steam bearing. Work is expected to be completed by mid-November with
EG1301
Seal Repair a system check of the unit to occur immediately afterwards.
Schedule: Installation work planned for the fall outage.
6.0 General Plant Information
With the passing of Mr. Phil Kosek in September, the plant is actively recruiting to fill
his vacant position as the Administrative Manager for the plant. In this effort, NAES
Corporate staff has been supplying substantial support in both helping to fill the vacant
position but also to perform and provide direction with the completion of many of the
tasks that Mr. Kosek had performed at the plant.
The plant has brought on Patricia Braun as a temporary Administrative Assistant to help
with administrative functions.
Brian Hoyt, Compliance Specialist, assumed the duties of maintaining the Safety
Program. His title was changed to Compliance Manager at this time as well.
Training:
Topics discussed during the monthly safety committee meeting were reviewed by the
entire staff. The monthly safety topic was on “Winter Slip Protection” which provided
important information on how to avoid injuries that typically might occur during the
wintery season.
25
Page 34
Calendar of Events Date
Units 1, 2, 3 and 11 Fall Outage October 1, 2012 – December 3, 2012
Two Year Accident Free October 14, 2012
Winter Capacity Period December 1, 2012 to February 28, 2013
McKee Run and VanSant Title V Annual Certification Due February 1, 2013
Annual VanSant Black Start Test TBD
EIA-860 Report February 28, 2013
EIA-923 Report February 28, 2013
NOx Emissions Reconciliation Due March 1, 2013
SO2 Emissions Reconciliation Due March 1, 2013
SARA III Report March 1, 2013
NPDES Permit Renewal Due March 4, 2013
Units 1, 2, and 3 Spring Outage March , 2013 – June 1, 2013
Unit 11 Spring Outage March , 2013 – June 1, 2013
Air Emission Inventory June 30, 2012
NOx Ozone Season Starts May 1, 2013
PJM Summer Capacity Test Period June 1, 2013 – August 31, 2013
Toxic Release Inventory (TRI) Annual Report July 1, 2013
McKee Run and VanSant Title V Semi-Annual Certification Due August 1, 2013
DRBC Study Due September 15, 2013
NOx Ozone Season Ends September 30, 2013
26
Page 35
7.0 Summary of NAES Performance to Date
Plant Performance FY 2012-2013
Measure Month Year to Date YTD FY Maximum
Incentive Incentive
Commercial
0% 0% $92,128 $92,128
Unavailability (CU)
Safety 0 0 $17,273 $17,273
Environmental 0 0 $17,273 $17,273
Capacity Tests
Summer Winter Summer Winter
Completed
Unit 1 No Yes* Yes Yes* $3,455* $3,455
Unit 2 No Yes* Yes Yes* $3,455* $3,455
Unit 3 No Yes* Yes Yes* $20,520* $20,520
Unit 11 No Yes* Yes Yes* $6,840* $6,840
Total YTD
100.00% Total YTD Incentive $161,224 $161,224
Incentive %
Note: Units 1 and 2 PJM Summer Capacity Tests have been successfully completed and would be entered
into the PJM Winter Capacity Test Exemption Program*. The YTD Incentive calculation reflects this
information.
27
Page 36
IV. Appendix – PJM Invoice Breakdown
Gen Load Grand Total
Auction Revenue Rights $ (1,117.24) $ (1,117.24)
Balancing Operating Reserve $ 19,156.25 $ 19,156.25
Balancing Spot Market Energy $ (268,454.24) $ (268,454.24)
Balancing Transmission Congestion $ (2,980.89) $ (2,980.89)
Balancing Transmission Losses $ (255.24) $ (255.24)
Black Start Service $ (6,905.58) $ 2,004.39 $ (4,901.19)
Capacity Resource Deficiency $ (246.15) $ (246.15)
Capacity Transfer Rights $ (33,318.18) $ (33,318.18)
Day-ahead Operating Reserve $ 20,354.33 $ 20,354.33
Day-ahead Scheduling Reserve $ 5.98 $ 5.98
Day-ahead Spot Market Energy $ 583,266.65 $ 583,266.65
Day-ahead Transmission Congestion $ (6,569.08) $ (6,569.08)
Day-ahead Transmission Losses $ 53,676.59 $ 53,676.59
Expansion Cost Recovery $ 413.85 $ 413.85
FERC Annual Recovery $ 3,905.66 $ 3,905.66
Generation Deactivation Refund $ (744.31) $ (744.31)
Inadvertent Interchange $ 297.30 $ 297.30
Load Reconciliation for Balancing
Operating Reserve $ (8.14) $ (8.14)
Load Reconciliation for FERC Annual $ (15.42) $ (15.42)
Load Reconciliation for Inadvertent $ (1.19) $ (1.19)
Load Reconciliation for Market Monitoring
Unit (MMU) Funding $ (1.01) $ (1.01)
Load Reconciliation for North American
Electric Reliability Corporation (NERC) $ (2.42) $ (2.42)
Load Reconciliation for PJM Scheduling,
System Control and Dispatch Service $ (46.23) $ (46.23)
Load Reconciliation for PJM Scheduling,
System Control and Dispatch Service $ 2.06 $ 2.06
Load Reconciliation for Reactive Services $ (157.80) $ (157.80)
Load Reconciliation for Regulation and
Frequency Response Service $ (53.25) $ (53.25)
Load Reconciliation for Reliability First
Corporation (RFC) $ (3.02) $ (3.02)
Load Reconciliation for Schedule 9-6 -
Advanced Second Control Center $ (5.96) $ (5.96)
Load Reconciliation for Spot Market $ (8,258.16) $ (8,258.16)
Load Reconciliation for Synchronized $ (11.91) $ (11.91)
Load Reconciliation for Transmission
Congestion $ (578.22) $ (578.22)
Load Reconciliation for Transmission $ (473.72) $ (473.72)
Load Reconciliation for Transmission
Owner Scheduling, System Control and
Dispatch Service $ (16.63) $ (16.63)
28
Page 37
Locational Reliability $ 984,734.28 $ 984,734.28
Market Monitoring Unit (MMU) Funding $ 258.47 $ 258.47
Meter Error Correction $ (3,228.30) $ (3,228.30)
Network Integration Transmission Service $ 295,467.82 $ 295,467.82
Non-Firm Point-to-Point Transmission $ (357.03) $ (357.03)
North American Electric Reliability
Corporation (NERC) $ 612.19 $ 612.19
Organization of PJM States, Inc. (OPSI)
Funding $ 39.10 $ 39.10
PJM Scheduling, System Control and
Dispatch Service - Advanced Second $ 1,236.75 $ 1,236.75
PJM Scheduling, System Control and
Dispatch Service - Capacity $ 948.91 $ 948.91
PJM Scheduling, System Control and
Dispatch Service - Control Area $ 9,591.21 $ 9,591.21
PJM Scheduling, System Control and
Dispatch Service - Market Support $ 2,169.85 $ 2,169.85
PJM Scheduling, System Control and
Dispatch Service - Market Support Offset $ (317.44) $ (317.44)
PJM Scheduling, System Control and
Dispatch Service - Regulation Market $ 100.94 $ 100.94
PJM Scheduling, System Control and
Dispatch Service Refund - Capacity
Resource/Obligation Mgmt. $ (169.39) $ (169.39)
PJM Scheduling, System Control and
Dispatch Service Refund - Control Area $ (1,676.68) $ (1,676.68)
PJM Scheduling, System Control and
Dispatch Service Refund - Market Support $ (384.22) $ (384.22)
PJM Scheduling, System Control and
Dispatch Service Refund - Regulation
Market Administration $ (19.77) $ (19.77)
PJM Settlement, Inc. $ 317.44 $ 317.44
Reactive Services $ 19,370.33 $ 19,370.33
Reactive Supply and Voltage Control from
Generation and Other Sources Service $ (29,467.58) $ 32,254.77 $ 2,787.19
Regulation and Frequency Response $ 21,770.69 $ 21,770.69
Reliability First Corporation (RFC) $ 765.25 $ 765.25
29
Page 38
RPM Auction $ (1,205,977.50) $ (1,205,977.50)
Synchronized Reserve $ 8,135.66 $ 8,135.66
Synchronous Condensing $ 207.93 $ 207.93
Transmission Enhancement $ 18,945.11 $ 18,945.11
Transmission Losses $ (23,241.03) $ (23,241.03)
Transmission Owner Scheduling, System
Control and Dispatch Service $ 4,211.76 $ 4,211.76
Balancing Operating Reserve for Load $ (24.72) $ (24.72)
Load Reconciliation for Organization of
PJM States, Inc. (OPSI) Funding $ (0.15) $ (0.15)
Load Reconciliation for Day-ahead
Scheduling Reserve $ (4.76) $ (4.76)
Emergency Load Response $ 1,365.09 $ 1,365.09
Demand Resource and ILR Compliance $ (472.77) $ (472.77)
Day-Ahead Load Response Charge $ 683.21 $ 683.21
Real-Time Load Response Charge $ 721.12 $ 721.12
Incremental Capacity Transfer Rights $ (1,036.95) $ (1,036.95)
Michigan - Ontario Interface Phase Angle
Regulators $ 194.25 $ 194.25
Non-Synchronized Reserve $ 232.94 $ 232.94
Grand Total $ (1,242,350.66) $ 1,733,166.51 $ 490,815.85
30