REGULAR COUNCIL MEETING
The Regular Council Meeting was held on October 22, 2012 at 7:30 p.m. with Council President
Leary presiding. Council members present were Mr. Anderson, Mr. Lynn, Mr. Perza, Mr. Bonar,
Mr. Hare, and Mr. Hutchison. Mrs. Williams was absent.
Council staff members present were Police Chief Hosfelt, Mrs. Mitchell, Mr. Koenig,
Mrs. Townshend, Fire Chief Fortney, City Solicitor Rodriguez, and Mrs. McDowell. Mayor Carey
was also present.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Leary declared the Open Forum in session and reminded those present that
Council was not in official session and could not take formal action.
Mr. EShed Alston, 406 Arnold Court, Dover, stated that racially derogatory flyers were being
distributed throughout the City and that documentation regarding this matter was provided to the
City Clerk’s Office to distribute to Council. It was his feeling that there was some type of cover up.
He reminded members that a citizen, Johnny Clark, had committed suicide, according to the City,
but indicated that since this occurred another individual had informed Mr. Alston that he had been
treated the same way as Johnny Clark at the same location. He demanded that the City conduct an
investigation into this matter, expressing his belief that if these were Caucasian children being killed
by black domestic terrorists, action would already have been taken. Mr. Alston indicated that a task
force should be established regarding this matter.
Dr. Jahi Issa, 1300 S. Farmview Drive, advised members that the flyer referred to by Mr. Alston
began circulating in the City at the end of last year. As a member of the National Association for
the Advancement of Colored People (NAACP), he began an investigation into this matter to
determine its validity. He stated that he frequently visited Silver Lake Park with his children and had
not done so since the suicide. He felt that enough time had lapsed to launch an investigation
regarding this important and very serious issue.
Mr. Doug Beatty, resident of Meadowbrook Acres in Magnolia, stated that he was seeking political
office in the 34th District and was made aware during a candidates' forum of the previously
mentioned flyer, as well as the suicide and reported abduction of a gentleman on September 17,
2012. He explained his bias regarding this matter due to having observed the killing of his neighbor
on his doorstep on October 31, 2006 and having seen detectives deliberately overlook evidence.
Mr. Beatty indicated that he had spoken to the second victim over the telephone, interviewed 14
people on the street, and spoke to some of the legislators. He stated that one (1) of the sitting state
senators had indicated that he looked into the matter and found that there were untruths generated
by some individuals who were trying to start a race riot. Mr. Beatty noted that if this conclusion
were true, he would like to know who was responsible. He stated that although it was determined
that Johnny Clark committed suicide, this was not the belief of his family and he suggested more
investigation into this matter. With regard to the alleged abduction occurring on September 17th, he
stated his belief that no report was taken. Mr. Beatty indicated that these types of incidents cause
ramifications, including the discrediting of the entire State and the processes involved. He reiterated
his desire to determine who was behind this incident if it were the result of fraud, and if it was not
Page 2
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 2
fraud, he wanted the perpetrators brought to justice. He noted that all should have a common interest
in this regard and urged City Council to take leadership and positive, pro-active steps to resolve this
matter.
The invocation was given by Councilman Hutchison, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda as presented, seconded by Mr. Bonar and
unanimously carried.
Mr. Bonar moved for approval of the consent agenda as presented, seconded by Mr. Hare and
carried by a unanimous roll call vote (Williams absent).
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF OCTOBER 8, 2012
The Minutes of the Regular Council Meeting of October 8, 2012 were unanimously approved
by motion of Mr. Bonar, seconded by Mr. Hare and bore the written approval of
Mayor Carey.
RESOLUTION NO. 2012-15 - RECOGNITION OF SERVICE - FRANCIS NICHOLS -
PLANNING COMMISSION - MAY 28, 2002 THROUGH SEPTEMBER 17, 2012
The City Clerk read Resolution No. 2012-15 into the record.
By motion of Mr. Hare, seconded by Mr. Hutchison, and by a unanimous roll call vote
(Williams absent), Council adopted Resolution No. 2012-15, as follows:
WHEREAS, Francis C. Nichols was appointed to the City of Dover Planning Commission on
May 28, 2002 and served with diligence and distinction in this capacity as an advocate for sound
land use planning in the public interest, ensuring fundamental fairness and careful forethought in the
planning and development of the Capital City; and
WHEREAS, prior to his appointment to the Planning Commission, Francis C. Nichols served on the
City of Dover Utility Committee from June 28, 1999 through May 28, 2002 and subsequently shared
his knowledge and experience in the areas of utility services and stormwater management as a
Planning Commissioner; and
WHEREAS, Francis C. Nichols has influenced the pattern and appearance of development in Dover
through his contributions to the City's Comprehensive Plans, including the 2003 Comprehensive
Plan Update and the 2008 Comprehensive Plan, and his participation in the development of
numerous amendments to the City of Dover Zoning Ordinance including the AEOZ, TND, SWPOZ,
and ROS zones; and
WHEREAS, Francis C. Nichols completed his service on the City of Dover Planning Commission
on September 17, 2012.
Page 3
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 3
NOW, THEREFORE, BE IT RESOLVED that the Mayor, Council, and Planning Commission do
hereby express their sincere appreciation to Francis C. Nichols for his faithful and exemplary service
to the citizens of the City of Dover as an active member of the City of Dover Planning Commission.
BE IT FURTHER RESOLVED that the Mayor, Council, and Planning Commission wish Francis
C. Nichols success in all future endeavors and direct the City Clerk to make this resolution a part of
the permanent records of the City of Dover as a lasting symbol of appreciation and gratitude to
Francis C. Nichols.
ADOPTED: OCTOBER 22, 2012
On behalf of members of Council, Mayor Carey presented Mr. Francis Nichols with a Dover Cup,
along with the Resolution, in recognition of his service as a member of the Planning Commission
from May 28, 2002 through September 17, 2012.
Mr. Nichols relayed appreciation for the recognition and for the opportunity provided to him during
the past several years.
PROCLAMATION - EXTRA MILE DAY
The City Clerk read the following Proclamation into the record:
WHEREAS, the City of Dover is a community which acknowledges that a special vibrancy exists
within the entire community when its individual citizens collectively "go the extra mile" in personal
effort, volunteerism, and service; and
WHEREAS, the City of Dover encourages its citizens to maximize their personal contributions by
giving of themselves wholeheartedly and with total effort, commitment, and conviction to their
individual ambitions, family, friends, and community; and
WHEREAS, the City of Dover chooses to shine a light on and celebrate individuals and
organizations who "go the extra mile" in order to make a difference and lift up fellow members of
their community; and
WHEREAS, the City of Dover recognizes the mission of the Extra Mile America Foundation to
create 200 Extra Mile cities in America and is proud to support "Extra Mile Day" on November 1,
2012.
NOW THEREFORE, I, CARLETON E. CAREY, SR., Mayor of the City of Dover, Delaware do
hereby proclaim November 1, 2012 to be EXTRA MILE DAY in the City of Dover and urge each
individual in the community to take time on this day to not only "go the extra mile" in his or her own
life, but to also acknowledge all those who are inspirational in their efforts and commitment to make
their organizations, families, community, country, and world a better place.
Page 4
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 4
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE REPORT -
OCTOBER 8, 2012
The Parks, Recreation, and Community Enhancement Committee met on October 8, 2012, with
Acting Chairman Bonar presiding.
Review of Active Recreation Area Plan - Leander Lakes Apartments
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that as part of the Site Plan review process for Leander Lakes Apartments, the applicant prepared a
Conceptual Recreation Plan illustrating how the development would provide recreation amenities
in accordance with the design specifications described in Article 5, Section 10 of the Zoning
Ordinance. Mrs. Townshend reviewed the Active Recreation Plan and stated that the proposal must
be reviewed by the Parks, Recreation, and Community Enhancement Committee for a
recommendation prior to consideration of the Site Plan by the Planning Commission.
Mrs. Townshend advised members that the road labeled on the plans as Rinnier Row, which
separates Leander Lakes from the new Dover High School site, would be relabeled Dover High
Drive. She explained that the applicant was required to provide 66,000 s.f. of Active Recreation
Area and the submitted plan included 84,241 s.f. The recreational facilities would be located
throughout the site and include a clubhouse and swimming pool, playground equipment, a dog park,
and three (3) walking paths around stormwater ponds. Mrs. Townshend reminded members that the
Committee was charged with determining if the amenities were accessible and age-oriented to the
development. She noted that staff provided a number of additional recommendations to the
developer, as detailed on the Data Sheet for Recreation Plan Review.
Responding to Mrs. Horsey, Mr. Jeff Anderson, Landscape Architect, Rodney Robinson Landscape
Architects, Inc., stated that the dog park would have a series of rules and regulations, including
specifications regarding the collection of droppings. He noted that a waste receptacle would be
provided and trash would be collected on a regular basis (weekly or bi-weekly).
Mr. Keith Cooker, Landmark Engineering, stated that he was unsure whether a lifeguard would be
available on the site, although he assumed this would be the case since the developer had another
similar facility in Salisbury, MD which had a lifeguard and stated that he could determine this from
the owner if required. He indicated that the pool would be fenced and access would be limited to
residents of the complex.
Mr. Jeff Anderson confirmed that there would be a fence around the decking of the pool with access
gates which would be locked unless a guard or someone in charge was present.
Responding to Councilman Anderson, Mr. Cooker confirmed that there were no objections to staff’s
recommendations; however, he suggested that bike racks may not be necessary in the playground
area since it was unlikely that children would store their bikes there. The developer concurred that
bike racks should be provided in the pool area.
In response to Councilman Anderson, Mrs. Townshend confirmed that staff agreed to remove the
requirement for bike racks in the playground area and could make note of this when the plan was
presented to the Planning Commission.
Page 5
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 5
The Committee recommended approval of the Active Recreation Area Plan for Leander Lakes
Apartments as presented, with the inclusion of staff’s comments and recommendations, with the
exception of the requirement for bike racks in the playground area.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
UPDATES
The following updates were provided to members:
Planning and Funding for New Library
Ms. Margery Cyr, Library Director, advised members that $1,705,078 had been raised through the
Capital Campaign for the new library in donations and pledges as of October 8, 2012. Memorial
brick pavers were still being sold and naming opportunities were also available. The Grand Opening
of the library was celebrated on September 20, 2012 with many attendees and the Library was in its
18th day of operation. She informed members that a punch list of items to be finished was still being
addressed, including interior directional signage, and the Reading Garden was well on its way to
completion. Staff was also waiting on some carpeting, shelving, and a small amount of furniture.
Staff was heavily involved in training to learn how to use all of the systems in the building.
Responding to Mr. Anderson, Ms. Cyr stated that the name of the facility was the Dover Public
Library.
Mr. Anderson congratulated Ms. Cyr on a beautiful building and a wonderful job in bringing it to
fruition.
Mr. Bonar stated that Ms. Cyr had done a marvelous job with the dedication ceremony and the
library itself and expressed his thanks to her. He noted that his only concern regarding the library
was the future cost of running the facility.
In response to Mr. Bonar, Ms. Cyr stated that the fundraising goal for the project had been exceeded
and that additional contributions received would be “good for the City.”
CDBG Program
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed the
Status of FY-12 Program Funds Spent - Fiscal Year 7/1/12 - 6/30/13. She noted that the Funds
Expended Column reflected $0; however, agreements had been executed with applicants on
October 5, 2012, and it was expected that the expenditure of funds would begin soon.
Noting that the City had moved to a three (3) year process for block grants and that two (2) of the
projects were one-time undertakings (Serenity Place and Elizabeth W. Murphey School);
Mr. Anderson questioned if additional applications would be taken for remaining portions of these
funds for next year. Responding, Mrs. Townshend explained that the program was structured to
approve each applicant (rather than each project) for a three (3) year period; therefore, the current
applicants could apply for funding for additional projects after completion of the initial projects. She
Page 6
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 6
noted that staff allowed for the possibility of an exception to be made (with the review of the
Committee) if an unexpected circumstance arose where a non-profit or other qualified agency was
in need of funds.
In response to Mr. Anderson, Mrs. Townshend stated that, theoretically, funds could be opened up
if any of the applicants did not have an additional project that qualified or if a project were
completed at a lower dollar amount. She did not believe that a grant cycle would occur in which all
funds were not allocated. Mrs. Townshend stated that if this occurred, staff would issue a proposal
indicating that pre-screened applicants could submit applications. She noted that the City of Dover
could also put forward projects and that funding of police extra duty hours or other needs had been
handled in this way in the past.
Mr. Anderson stated his pleasure in the progress of the Neighborhood Stabilization Program (NSP)
as reflected in the Status of FY-12 CDBG Projects.
By consent agenda, Mr. Bonar moved for acceptance of the Parks, Recreation, and Community
Enhancement Committee Report, seconded by Mr. Hare and carried by a unanimous roll call
vote (Williams absent).
UTILITY COMMITTEE REPORT - OCTOBER 8, 2012
The Utility Committee met on October 8, 2012 with Chairman Bonar presiding.
Unit 1 Turbine Steam Seal Repair - McKee Run Generating Station
Mr. Scott Koenig, City Manager, advised members that the McKee Run Unit 1 steam turbine
developed a steam leak on the governor end of the machine. This leak has progressively gotten
worse to the point that it is affecting the operation of the #1 bearing on this unit. When operating,
this bearing is now running at elevated temperatures when the unit is at full load. This is an
undesirable condition which could lead to damage to the bearing (if it is not already damaged), and
possibly result in a forced outage. This Unit is not likely to operate until the Spring of 2013;
however, repairs need to be made as soon as possible to avoid further damage to the unit.
To address the problem, NAES will replace the governor end outer gland seals and inspect the #1
bearing for damage. This will require:
• Removing the outer gland housing and seals.
• Sending seals to the OEM for refurbishment.
• Reinstalling the seals and gland housing and aligning the housing to the turbine shell.
• Removing the governor table to access the #1 bearing.
• Removing the bearing and inspecting/repairing as necessary, reassembling the bearing.
If work on the bearing is required, an alignment check will have to be performed.
• Reassembly of the governor table.
• Operationally testing the unit.
Page 7
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 7
The cost to perform this work is $65,000, assuming no damage is found to the #1 bearing. The work
can easily be accomplished in the fall outage timeframe. However, this work was not included in
the original 2013 Operation and Maintenance (O&M) budget nor in the 2013 Capital Investment
Plan (CIP) budget.
Staff recommended approval of the Unit 1 Turbine Steam Seal Repair as a new Capital Investment
Plan (CIP) project and the expenditure of funds for the project in FY 2013.
Responding to Mr. Blakeman, Mr. Koenig stated that he was unsure when the steam leak was first
noticed but estimated that this occurred approximately one (1) to two (2) months ago.
Mrs. Donna Mitchell, Controller/Treasurer, stated her belief that it had been detected over three (3)
months ago and had gotten worse since that time.
In response to Mr. Blakeman regarding the cost of a second alignment for the bearing (if required),
Mr. Koenig stated that this would be included in the cost of the repair of the bearing; however,
authorization was being requested only for the initial inspection of the bearing at this time. The cost
of repairing the bearing (if damaged) and the timeframe required had not been discussed; however,
he noted that NAES was planning to be online for calls coming in during the Spring of 2013.
Mrs. Mitchell explained that if it were discovered that the bearing had significant damage, a revised
estimate would be provided to the City. She stated that if the cost was substantial, it was probable
that this matter would be brought back to the Utility Committee.
Responding to Mr. Blakeman, Mr. Koenig stated that no estimate had been received regarding the
cost or availability of a new bearing, nor information regarding the type of damage that could result
if the bearing failed while the unit was operating.
In response to Mr. Bonar, Mr. Koenig projected that failure to repair the steam seal could result in
a forced outage involving Unit 1.
The Committee recommended approval of the Unit 1 Turbine Steam Seal Repair as a new Capital
Investment Plan (CIP) project and expenditure of funds for the project in FY 2013, as recommended
by staff.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
UPDATES
National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm Sewer
Systems (MS4) Permit
Mrs. Ann Marie Townshend, Director of Planning and Community Development, conveyed her
thanks to Wesley College for continuing to work with staff on the National Pollution Discharge
Elimination System (NPDES) Municipal Separate Storm Sewer Systems (MS4) Permit. She advised
Page 8
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 8
members that Mr. Nicholas DiPasquale, former Secretary of the Department of Natural Resources
and Environmental Control (DNREC) and current Director of the Chesapeake Bay Program for the
Environmental Protection Agency (EPA), would be speaking at the new Dover Public Library on
October 16, 2012 regarding what could be learned about the City’s watersheds from the Chesapeake
Bay experience.
Garrison Oak Technical Park Project
Mr. Scott Koenig, City Manager, stated that the Garrison Oak Technical Park project was
progressing. Staff met with the Delaware Department of Transportation (DelDOT) on
October 8, 2012 to discuss the entrance permits. He noted that applications from Calpine were
progressing through City and State-level review processes and Calpine was currently working on air
permitting. Staff was working with Calpine on site plan approval as well as approvals of the overall
Garrison Technology Park. He informed members that at recent Council meetings, approvals were
granted for engineering service agreements for the design of a 1.5M gallon water tower and a pump
station to serve the Garrison Farm and outlying areas of the City. The most recent discussions with
Calpine indicated their hope to achieve a building permit in approximately January or February.
Mr. Koenig stated that he was originally told that improvements to the PJM grid would be required
in the Wilmington and southern Pennsylvania areas; however, he had learned during the previous
week that, because of changes in the grid, it appeared that those improvements would not be required
for Unit 1 at this time. He noted that this was not the case for Unit 2. He indicated that
improvements made would involve obtaining a 230 KV line from the Calpine plant to the City’s
Cartanza Substation.
Responding to Mr. Snaman regarding the status of a filing for pipeline by Chesapeake Utilities,
Mr. Koenig stated his understanding that a related hearing had been scheduled approximately one
and one-half weeks prior at the Delaware Public Service Commission.
Mr. Bonar indicated that this workshop meeting (to discuss the southern Delaware expansion being
requested by Chesapeake Utilities and the expansion in the size of transmission to 16 inches for
central Delaware) had been postponed.
In response to Mr. Snaman, Mr. Bonar stated that the Federal Energy Regulatory Commission
(FERC) would have to be notified of the increase in the size of Chesapeake’s transmission; however,
the only hearing process would be through the Delaware Public Service Commission.
TEA/NAES (The Energy Authority and North American Energy Services) Report
Mr. Blakeman noted that members had not received the TEA/NAES monthly report since the
October 12, 2011 report that was reviewed during the meeting held on January 12, 2012.
Mrs. Mitchell explained her understanding that Mr. Bonar had requested staff to discontinue sending
the report.
Mr. Bonar clarified that his request was that the report not be formally presented but be submitted
electronically. Mrs. Mitchell apologized for her misunderstanding.
Page 9
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 9
Mr. Bonar stated that reports had been reviewed previously on an agenda in a public fashion;
however, since they could be submitted electronically there was no need to review them on a
monthly basis unless a member of the Committee or Council had a specific question.
In response to Mr. Blakeman, Mrs. Mitchell offered to send the year-end report for Fiscal Year 2012,
which would include the month of June and year-to-date, and to again provide the report monthly.
By consent agenda, Mr. Bonar moved for acceptance of the Utility Committee Report,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
OCTOBER 8, 2012
The Legislative, Finance, and Administration Committee met on October 8, 2012 with Chairman
Lynn presiding.
Authorization to Purchase Downtown Security Cameras
Members were advised that Mayor Carey had proposed the purchase and installation of 16 additional
outdoor security cameras in the downtown area to expand the existing camera network. The
proposed locations and details were as follows:
Expansion #1: $51,675 - Five (5) Cameras - Installation Quote from Advantech for
New Street & Reed Street, S. Governors Avenue & Reed Street, Loockerman Street
& S. Bradford Street, S. Bradford Street & Reed Street.
Expansion #2: $24,905 - Four (4) Cameras - Installation Quote from Advantech for
S. Governors Avenue & North Street and S. New Street & North Street.
Expansion #3: $21,480 - Three (3) Cameras - Installation Quote from Advantech
for Reed Street & S. Kirkwood Street, Loockerman Street & Slaughter Street, North
Street & Slaughter Street/Jerusalem Way.
Expansion #4: $29,720 - Four (4) Cameras - Installation Quote from Advantech for
Division Street & Governors Avenue, Division Street & New Street, Division Street
& Queen Street
Fiber Installation is estimated to cost $7,620 by City of Dover and Goldhorn
Electrical.
Total Equipment Cost of Proposed Project is $135,400. (No incremental operating
cost, other than the maintenance will be incurred.)
Fiscal Note: The limited warranty for products and installation would be effective
for one (1) year from the date of the Advantech invoice for the installation. The
service plan for this equipment would commence one (1) year after systems are
installed for $9,300 per year. The City would be responsible for any liability incurred
on City premises.
Page 10
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 10
Members were advised that there were two (2) options available to fund this project, as follows:
Option A - Staff requested that the City pay for the cameras using $102,400 of
General Fund street program carry forward balance and $33,000 that was approved
in the Mayor’s budget. This recommendation was made based on the forward
movement of the General Fund.
Option B - The Mayor recommended that $135,400 of Community Transportation
Funds, which are restricted to non-public safety public works projects, be “swapped
out” with General Fund monies and allocated for the project. He suggested that the
total project be funded using $135,400 of the General Fund Street Program carry
forward balance and that the Mayor’s budgeted money be used later for additional
cameras and maintenance not included in this quote. It was noted that the
Community Transportation Funds would be used for the Street Program.
Mayor Carey explained that he had been working with State legislators and staff since late March
or early April to obtain the funding needed to accomplish this project. He noted that a representative
from Advantech Incorporated, was present to provide additional information and answer questions.
Mr. Ryan Kelly, Advantech Incorporated, reviewed a presentation entitled, “City of Dover Wireless
Camera Expansion Project,” that included details regarding the proposed project.
Responding to Mr. Lynn, Mr. Kelly stated that camera footage for the City’s 14 existing cameras was
currently being stored for approximately four (4) months.
In response to Mr. Anderson, Mr. Kelly stated that all expansions were wireless and footage would
be relayed to a wireless access point at the Fire Department and then be transmitted to the Police
Department via fiber.
Responding to Mr. Shevock, Mr. Kelly stated that, based on storage limitations, the maximum
number of cameras that could be installed in the system would be 50, and the addition of cameras
as proposed would bring the City’s total to 30. He explained that although more cameras could be
added, this would reduce the storage capacity. Mr. Kelly explained that the storage capacity for up
to 50 cameras would be approximately 30 days and estimated that continuous use of 30 cameras
would allow for 45 days of storage. If the total number of cameras were to exceed 50, settings could
be adjusted to record on motion only, etc., to achieve the timeframe needed.
Mayor Carey explained a fifth expansion of the system had been requested by State legislators in
conjunction with the North Street project and was included in State grant funding for that project.
This expansion would be incorporated in the City system.
In response to Mr. Lynn, Mr. Kelly informed members that in the event of an incident, the video
would be saved to a thumb drive or CD and stored as a clip. Information would be written to a hard
drive on a “first in, first out” basis; therefore, non-pertinent information would not be available after
30 days.
Page 11
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 11
Responding to Mr. Lynn, Chief Hosfelt indicated that the Police Department had not experienced
a situation where there was a need for information to be stored for longer than 30 days.
In response to Mr. Bonar, Mr. Kelly stated that the expected life span of the cameras was
approximately seven (7) to ten (10) years and the resolution of the footage was “as good as it is going
to get.”
Mr. Bonar reminded members and residents that should grant funds for this project run out, the City
would be obligated for maintenance costs and this would be an ongoing expense; however, it would
eliminate the need to place a police officer on a particular corner.
Responding to Mr. Perza, Mr. Kelly advised members that the response time for attending to
equipment problems was typically within 24 hours of reporting the problem. He noted that this was
part of the maintenance agreement that the City has with the existing system and this is provided
under a one (1) year warranty for new equipment. If the City were to switch security providers in
the future, the City would own the cameras and pay for parts and labor, and the maintenance contract
with Advantech Incorporated would simply expire. He assured members that the equipment
proposed for purchase was at the beginning of its technological age.
Responding to Mr. Anderson regarding the intentions of legislators in dedicating funds,
Mr. Scott Koenig, City Manager, explained that the State legislators were interested in the project
but could not fund the camera purchase with Community Transportation Funds; therefore, they
requested that the City “swap” funding. He advised members that a number of street projects came
in slightly under budget, and in some cases legislators contributed more money than was originally
anticipated for these projects. For this reason, the City had General Fund street money that could
be reallocated to the camera project and legislators had agreed to “backfill” that funding with new
Community Transportation agreements. Mrs. Donna Mitchell, Controller/Treasurer, and Mr. Koenig
made the recommendation to hold the total camera project at $135,400 because, as the Mayor
indicated, the original draft budget had no camera purchases in it because the City was facing a
deficit. Mr. Koenig noted that there were still deficits going forward in the General Fund and, since
this was a General Fund expense, it was staff’s recommendation to take the $33,000 that Council
allocated toward cameras and add $102,000 of unrestricted street financing to make the purchase.
The State legislators would then backfill the $102,000 (and probably backfill more than the
$102,000, as they have done in the past for streets within their legislative districts). Mr. Koenig
stated it was staff’s position that the security cameras were nice things to have in the budget and
would be cheaper than a police officer; however, expenditure of these funds was not anticipated
when the budget was being built. The concern going forward was that the $9,300 maintenance
contract expense would become a baseline cost in the Police Department budget for as long as the
cameras are used.
Responding to Mr. Anderson, Mr. Koenig stated that the General Fund budget for the Police
Department was between $10M and $11M. He acknowledged that this was not a great deal of
money in the overall budget; however, he felt that expenses add up.
Page 12
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 12
In response to Mr. Perza regarding the potential to relocate the cameras in the future if necessary,
Mr. Kelly stated there is capability to move them as long they are in range of the wireless radio,
provided that power and a line of sight were available at the new location, and moving the cameras
would not be difficult.
Responding to Mr. Shevock regarding the possibility of adding new cameras in the future, Mr. Kelly
stated that most IP-based systems come with firmware updates; therefore, new technology could be
implemented into the system without hindering the system or having to incur cost for another
upgrade.
The Committee recommended that staff be authorized to sign a contract with Advantech
Incorporated for the purchase and installation of 16 additional security cameras at an estimated cost
of $135,400 using $102,400 of General Fund street program carry forward balance and $33,000 that
was approved in the Mayor’s budget.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
Revision to Fee Policy - Library Meeting Room Fees
Mr. Scott Koenig, City Manager, advised members that the new Dover Public Library was dedicated
on September 20, 2012. The new building includes a significant increase in the number of meeting
spaces compared to the old building. The Dover Public Library has for many years charged a fee of
$15.00 for the use of the meeting rooms and use of the meeting rooms has been limited to non-profit
and governmental agencies. With the opening of the new library, the size and number of the meeting
rooms has increased. In addition, the quality of the meeting rooms has been substantially improved;
therefore, staff requested consideration of increasing the room rental fees. The Dover Public Library
Advisory Commission reviewed the fee proposal on September 18, 2012 and endorsed the proposal
put forth by staff.
The recommended fees were as follows:
1st Floor – Large Meeting Room: $100.00 per use
1st Floor – ½ of the Large Meeting Room: $50.00 per use
2nd Floor Conference Room: $15.00 per use
Use of the rooms would remain limited to non-profit and governmental agencies.
Responding to Mr. Anderson, Ms. Margery Cyr, Library Director, stated that the proposed fees
would include the use of all equipment in the room but would not include set-up of the room;
therefore, those agencies using the room would be responsible for setting up and taking down the
tables and chairs. The large meeting room can be divided into two (2) smaller rooms, each of which
has a screen, projector, and wireless access.
Page 13
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 13
In response to Mr. Shevock, Ms. Cyr informed members that the second floor conference room seats
10 people. Since the conference room is limited to 10 people, staff anticipated that the room would
mostly be used for meetings of relatively short duration. The large meeting room as a whole seats
150 people; when the partition is pulled closed, one (1) side of the room seats 50 and the other seats
75. It was felt that meetings held in this room might be of longer duration and involve many more
people; therefore, the usage and wear and tear on the large room would be greater than the
conference room.
In response to Mr. Perza, Ms. Cyr stated that use of the rooms would be limited to any organization
that provides proof that they are an official non-profit entity.
Responding to Mr. Bonar regarding potential use of the facility by the Downtown Dover Partnership
(DDP), Ms. Cyr stated that typically the Dover Public Library does not charge library or City partners
for the use of meeting rooms.
The Committee recommended approval of staff’s recommendation to endorse and adopt the fees for
the meeting rooms in the new Dover Public Library as recommended by staff.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
Proposal to Develop Pocket Park at 301 South Governors Avenue (Southeast Corner of South
Governors Avenue and North Street)
Mr. Scott Koenig, City Manager, advised members that several years ago the City demolished the
dangerous building formerly located at 301 South Governors Avenue. The demolition charges were
placed as a lien against the property in accordance with the Dover Code of Ordinances. Recently,
the property was sold at a sheriff sale due to City tax delinquency, and the City was the successful
bidder and acquired the property.
Mr. Koenig reminded members that the Downtown Dover Partnership (DDP) received $3M from
the State of Delaware for North Street improvements between South State Street and South
Governors Avenue, including the development of a plaza on the former Collegian site, various
streetscape improvements, the repaving of North Street, and the consolidation of several parking lots
between The Green and North Street. This project was currently underway and was expected to be
completed under the $3M budget due to a favorable bidding climate. The DDP proposed developing
a pocket park on the property located at 301 South Governors Avenue with some of the funds
remaining from the State of Delaware funding. The development of a park in this location is
consistent with the Downtown Plan that was the result of the 2010 Transit Center Neighborhood
Charette.
Mr. Koenig stated that staff supported the development of a passive pocket park in this location as
it would enhance the downtown environment and, due to the size and location of the lot, future
commercial or residential development of the subject property would present a number of challenges.
Page 14
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 14
The City had been incurring costs associated with cutting the grass and cleaning up the property as
it routinely becomes overgrown and accumulates litter. Mr. Koenig noted that if the staff
recommendation were accepted, the City would need to write off the demolition and other associated
costs for the property which total approximately $35,996.08. The outstanding receivable would be
written off to the uncollectible reserve, which currently had a balance of $150,000. The proposed
construction cost of the new park was estimated at $68,196.45 and would be covered by the overall
project budget of $3M for the downtown streetscape project. Once completed, the City would be
responsible for the ownership and maintenance of the park in perpetuity and estimated annual
maintenance costs were $2,000 - $3,000 per year. Mr. Koenig reviewed a rendering of what the
proposed park would look like.
Staff recommended that the park be established on the subject property once the City holds title to
the property.
Responding to Mr. Hare, Mr. Koenig stated that the amount the City paid for the property was
included in the $35,996.08 previously cited. He was unsure if there were other bidders and advised
members that Mr. William Pepper, Deputy City Solicitor, handles all such sales for the City.
Mr. Rushe stated that, based on his own experience with sheriff’s sales, it was likely that the City
obtained the property for the amount that was owed to the City on the property.
Mr. Anderson inquired if, in view of the new parking lot being constructed on North Street, this park
would be vital for safe access from North Street through Loockerman Street for college students and
those who patronize the Schwartz Center. Responding, Mr. Koenig stated his opinion that this was
a great opportunity to take advantage of State funding and a piece of property that would be a
potential liability for the City in the future if it were not developed as a park because the City would
have to maintain it in some fashion. As a pocket park, he felt it would be well used, the rendering
was inviting, and the City would be very happy with the project once completed.
The Committee recommended that a pocket park be established on the property located at 301 South
Governors Avenue (on the southeast corner of South Governors Avenue and North Street) once the
City holds the title to the property, as recommended by staff.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
Proposed Ordinance #2012-22 Amending Chapter 114 - Vegetation, Article II - Weeds
(Collection of Grass Cutting Fees)
Mr. Perza advised members that Proposed Ordinance #2012-22 was a modification of an existing
ordinance which allows the City to collect grass-cutting fees by tacking them on as a lien on the
municipal lien docket at Kent County. The process typically requires the City to record the lien in
the hope that the City would be repaid at some point in the future. He noted that the process has a
cap, explaining that once a lien is recorded it is only good for three (3) years, regardless of whether
Page 15
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 15
or not it is paid. The proposed ordinance would permit the City to collect fees assessed by the City
for cutting the grass for property owners who are cited for tall grass by adding grass-cutting fees to
the annual tax bill. Mr. Perza stated that the assumption being made was that as property owners
receive their bills, they would pay the cost of cutting the grass along with their taxes; therefore, it
would not be necessary for the City to wait five (5), six (6), or seven (7) years to be reimbursed for
these expenses. Mr. Perza expressed his feeling that the ordinance would benefit all residents and
that collecting reimbursement within a reasonable amount of time would help defray the costs of
grass-cutting. He emphasized that this was not deemed to be an additional tax as this would involve
funds that are already owed by property owners after the City performs services.
Responding to Mr. Lynn, Mr. Perza confirmed that the purpose of the ordinance was to provide the
City a better opportunity to collect these debts within a reasonable period of time.
In response to Mr. Anderson, Mr. Perza stated that tax bills paid by escrow would not be affected
because banks would receive property tax bills, pay the taxes, and bill the property owner for any
shortfalls. For example, if a $500 tax bill were owed and a $50 grass-cutting fee were added to it,
but there was only $500 in escrow, the bank would pay the $500 and a supplemental invoice would
be sent to the property owner by the bank for the additional amount owed.
Mrs. Townshend informed members that there are significant out-of-pocket expenses for cutting
property owners’ grass amounting to approximately $12,000 to $15,000 per year. She stated that if
the City does not recover the costs, they are being paid by the taxpayers as a whole.
Responding to Mr. Hare regarding the possibility of “coat-tailing” other fines levied on the City to
this ordinance, Mr. Perza stated that he did not feel that other fees could be tacked on to Section 114
of the Municipal Code, which was specifically designed to allow the City to recoup grass-cutting
fees. He felt that the City would have to amend other portions of the Code, to permit collection of
additional fees generated from violations of other ordinances, in this manner.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, stated that the
ordinance was drafted to allow the City to recover out-of-pocket costs (including attorney’s fees) and
fines for grass violations. She concurred with Mr. Perza that fees in other sections of the Code
would have to be addressed by additional amendment(s); however, she stated that such
amendment(s) could be developed.
Mr. Perza stated that it would require manpower to perform the research to find every section of the
City Code to which such an amendment would apply.
Mr. Hare suggested that an additional ordinance be brought forward to speed up other processes and
Mrs. Townshend agreed.
Mr. Rushe expressed his opinion that the ordinance was “a great idea;” however, he questioned the
provision in Line #29 that “In the event that the owner, occupant, tenant or other agent caring for
or in charge of the premises” and suggested that this be changed to the “owner of record.” He stated
his feeling that this would eliminate the possibility of a notice being sent to a tenant without a
landlord’s knowledge.
Page 16
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 16
Mr. Perza concurred with amending the ordinance to address the owner of record.
Mr. Bonar stated that he also thought the proposed ordinance was “a great idea” and congratulated
Councilman Perza for his efforts. He suggested that rather than changing the Code piece by piece,
perhaps one (1) comprehensive change could be made that would take care of all sections of Code,
saving staff and Council a considerable amount of time.
Mr. Perza stated that, alternatively, this ordinance could be passed as a test case to see if any
problems arise before amending the entire Code.
The Committee recommended amending Line #29 of Proposed Ordinance #2012-22 by replacing
the words “owner, occupant, tenant or other agent caring for or in charge of the premises” with
“owner of record.”
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
The Committee recommended adoption of the ordinance as amended.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent). (The First
Reading of Proposed Ordinance #2012-22 with LF&A-1 will take place during the latter part of the
meeting.)
Fund to Combat Violent Crimes - New Grant Program Initiative
Members were advised that the Fund to Combat Violent Crime Program was a new grant program
managed by the Department of Safety and Homeland Security for use by local law enforcement
agencies in connection with initiatives to combat violent felonies pursuant to Section 4201(c) of
Title 11 of the Delaware Code. Police Chief James Hosfelt advised members that the Police
Department was requesting approval to use its grant allocation from this program. He explained that
about half of the funds ($22,500) would be used to purchase replacement sniper rifles and an insert
for an existing cargo van in the police fleet. The vehicle insert would enable the department to
transport a group of prisoners safely at one time. The remaining portion of the funds ($24,285.34)
would be used to target violent crime throughout the city with extra duty overtime patrols and
provide education to citizens on measures they can take to avoid or cope with violent crime related
activities.
Chief Hosfelt informed members that this was the first year of this new, ongoing, State-funded grant
resulting from an assessment that was placed on all criminal traffic arrests in the State of Delaware
and that each law enforcement agency throughout the State would receive a share. He indicated that
a significant portion of the City’s allocation would be spent for overtime hours to employ police
officers in off-duty hours. This would allow them to fight violent crime in areas where the need
arose and to provide the impression that the City has more police officers than it does.
Page 17
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 17
Mr. Lynn indicated that he attended a Greater Dover Committee meeting the previous week where
Chief Hosfelt received many kudos for his efforts to combat crime in downtown Dover. He
expressed his appreciation for the Chief’s continued efforts downtown and to obtain grant funding.
The Committee recommended approval for the Police Department to use its allocation from the Fund
to Combat Violent Crime Program, as recommended by staff.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Hare and carried by a unanimous roll call vote (Williams absent).
By consent agenda, Mr. Bonar moved for acceptance of the Legislative, Finance, and
Administration Committee Report, seconded by Mr. Hare and carried by a unanimous roll call
vote (Williams absent).
QUARTERLY REVENUE REPORT
Mrs. Donna Mitchell, Controller/Treasurer, reviewed the Revenue Report as of September 2012.
After conducting further research, Mrs. Mitchell indicated that $139,000 of the Police Extra Duty
Fees were related to the previous fiscal year; therefore, during the process of the audit, these funds
would be transferred to the previous year. She explained that some services were billed later in the
fiscal year, which resulted in the payment being received in the current year. She stated that the
amount would be adjusted to reflect the true total of $194,782 year to date, which is approximately
39% of the revenue projected for Police Extra Duty Fees in FY 13.
Mrs. Mitchell also advised members that Miscellaneous Receipts included inspection fees that would
be transferred and reported as such.
Responding to Mr. Anderson, Mrs. Mitchell confirmed that more Police Extra Duty Fees had been
received than in previous years. She reminded members that this amount would be offset by expense
since the City bills for Police Extra Duty to pay for overtime and benefits for the officers. She
explained that this does not offer a profit for the City.
In response to Mr. Hare, Mrs. Mitchell stated her belief that the City should include an
administrative fee for the Police Extra Duty. As requested, she stated that she would develop a
recommendation in this regard for further consideration.
Mr. Hare moved for acceptance of the Quarterly Revenue Report as of September 2012,
seconded by Mr. Lynn and unanimously carried.
SEMI-ANNUAL INSPECTION BY CITY MANAGER - ROBBINS HOSE COMPANY
In accordance with Section 46-43 of the City Code, the City Manager, Mr. Scott Koenig, met with
the Fire Chief to discuss current issues regarding the Robbins Hose Company. It was anticipated that
the Fire Company would request the replacement of Engine #7 in the upcoming budgets. He assured
members that staff would be requesting documented costs and equipment/vehicle evaluations to
Page 18
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 18
support the request, explaining that such a purchase would have a direct impact on the City’s General
Fund. He reported that the problems previously mentioned regarding the voice recording system and
the server that supports this system have been resolved.
Although the facilities were in excellent condition, Mr. Koenig advised members that, due to a recent
roof leak, there was damage to the meeting room floor, which is currently being repaired by a
contractor. He also noted that there were currently two (2) vacant Fire Dispatcher positions and
recruitment for these positions had been authorized. The Chief indicated that membership in the fire
company has remained strong. Mr. Koenig advised members that the Robbins Hose Company
continues to provide an outstanding level of service to the City of Dover.
By consent agenda, Mr. Bonar moved for acceptance of the report of the Semi-Annual Robbins
Hose Company Inspection, as submitted by the City Manager, seconded by Mr. Hare and
carried by a unanimous roll call vote (Williams absent).
EVALUATION OF BIDS - NRG SANITARY SEWER UPGRADE
Members were reminded that the FY-2013 budget included a capital project to remove inflow and
infiltration from the City’s wastewater distribution system. Mr. Scott Koenig, City Manager,
indicated that one (1) location in need of repair was 1280 West North Street, which is the location
of NRG Energy, Inc. He stated that a significant sink hole was discovered directly above the sanitary
sewer interceptor. As a result, staff performed a video investigation of the interceptor to evaluate
the condition of the sewer. The video indicated that multiple cracks are allowing groundwater and
sediment to enter the interceptor, thus causing the sink hole above the sewer main. He stated that
the infiltration is being treated at the Kent County Wastewater Treatment Plant, which costs the City
of Dover a significant amount of money.
Mr. Koenig advised members that bids were solicited for the NRG Sanitary Sewer Upgrade, which
included engineering specifications prepared by Pennoni Associates, Inc., with two (2) viable bid
options: 1) replace the infrastructure; and 2) rehabilitate the infrastructure, specifically relining. He
noted that the contractor was not required to bid on both options; only one (1) bid was required.
Staff recommended awarding a construction contract to the low bidder, Tri-State Grouting, LLC, in
the amount of $105,500 for the construction of the NRG Sanitary Sewer Upgrade.
Mr. Bonar moved for approval of staff’s recommendation to award a construction contract
in the amount of $105,500 to Tri-State Grouting, LLC, to rehabilitate the NRG Sanitary
Sewer. The motion was seconded by Mr. Anderson and carried by a unanimous roll call vote
(Williams absent).
EVALUATION OF BIDS - RADIO SYSTEM NARROW BANDING PROJECT
Mr. Scott Koenig, City Manager, advised members that the Federal Communications Committee
(FCC) has issued a mandate that requires those wireless radio systems operating on frequencies
below 512 MHz (on UHF and VHF channels) to reduce their broadcast bandwidth from 25 kHz to
12.5 kHz by January 1, 2013. He explained that prior to that date, the City has to migrate from
Page 19
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 19
25 kHz (wideband) to 12.5 MHz (narrowband) channel bandwidth or a technology that achieves
equivalent efficiency. Mr. Koenig advised members that the required migration entails the
replacement of a majority of the City’s radios used for daily operations. Staff has completed a
review of the City’s inventory as well as future use of the system. He advised members that based
on this review, the City must replace 111 mobile radios and 15 portable radios. The estimated cost
to complete this project is as follows:
Replace 111 Mobile XPR 4550 Radio Units: 111 ea. @ $ 706 = $ 78,366
Replace 15 Portable XPR 6550 Radio Units: 15 ea. @ $ 815 = $ 12,225
Remote Receivers & Programming: Lump Sum @ $3,874 = $ 3,874
Mobile Unit Removal & Installation (State): 111 ea. @ $ 50 = $ 5,550
Mobile Unit Removal & Installation (Contractor): 111 ea. @ $ 180 = $ 19,980
Based upon the pricing components, Mr. Koenig noted that the total project cost was estimated to
be between $100,015 and $114,445. The removal and installation of the mobile units may require
the purchase of some additional small parts; therefore, staff requested a budget authorization of up
to $120,000 to complete this project. He advised members that this project was originally budgeted
in Fiscal Year 2012 in the amount of $150,000; however, the project was delayed due to concerns
regarding the actual inventory of radios as well as the initial cost proposal submitted by the vendor.
Funds from the carry forward balance would be used to cover the costs of this project.
Staff recommended authorization to purchase the referenced radio units and work with the State of
Delaware and/or the private vendor on the State contract to complete the radio installation at a cost
not to exceed $120,000.
In response to Mr. Perza, Mr. Koenig stated that since the bandwidth was being withdrawn, the
service life for the current radios would end and they would be taken out of service and scrapped,
since there would be no other use for the radios. He stated that, to his knowledge, this was an
unfunded mandate of the federal government.
Mr. Bonar suggested that the City take action to attempt to receive compensation from some avenue
for the expenses.
Responding to Mr. Lynn, Mr. Koenig indicated that if the City does not comply with the mandate,
there could be a fine of up to $10,000 per day for non-compliance.
Mr. Bonar moved for approval of staff’s recommendation for authorization to purchase the
referenced radio units and work with the State of Delaware and/or the private vendor on the
State contract to complete the radio installation at a cost not to exceed $120,000, seconded by
Mr. Hutchison and carried by a unanimous roll call vote (Williams absent).
ATTORNEY SERVICES FOR LABOR NEGOTIATIONS
During an executive session held earlier in the evening, Mr. Scott Koenig, City Manager, advised
members that the firm of Baird Mandalas had been representing the City on various labor-related
issues. A fee schedule was prepared that included a total of $43,400 for representing the City of
Page 20
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 20
Dover and performing various attorney-related services relating to labor issues including American
Federation of State, County, and Municipal Employees (AFSME) petitions and Dover Organization
of Employees (DOE) mediation and potential arbitration.
In response to Mr. Anderson, Mr. Koenig indicated that the letter submitted by Baird Mandalas
indicates that the total amount equated to approximately $160 per hour, which reflected a “friendly”
price for the City of Dover.
Mr. Hare moved to authorize the use of Baird Mandalas to represent the City of Dover for
various attorney-related services for labor issues including American Federation of State and
Municipal Employees (AFSME) petitions and Dover Organization of Employees (DOE)
mediation and potential arbitration at a total cost of $43,400. The motion was seconded by
Mr. Bonar and carried by a unanimous roll call vote (Williams absent).
APPOINTMENT OF JUDGES - ROBBINS HOSE COMPANY ELECTION -
NOVEMBER 19, 2012
The Robbins Hose Company election is scheduled for November 19, 2012. The following persons
were recommended to serve as judges for the election:
1. James Howlett 2. James Hurley, Jr. 3. William Hurley, IV (alternate)
By consent agenda, Mr. Bonar moved for approval of the appointment of judges for the
Robbins Hose Company election, seconded by Mr. Hare and carried by a unanimous roll call
vote (Williams absent).
FIRST READING - PROPOSED ORDINANCE
Council President Leary reminded the public that copies of the proposed ordinance were available
at the entrance of the Council Chambers or could be obtained from the City Clerk's Office. Final
action by Council on Proposed Ordinance #2012-22 will take place during the Regular Council
Meeting of November 13, 2012.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, explained that the
proposed ordinance would add unpaid fines for grass cutting to the tax duplicate to be invoiced as
part of the annual property tax bill and collected as a part of the City property tax collection process
and holds the violator responsible for collection costs and attorney’s fees.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of the
Ordinance Amendment as read by the City Clerk, by title only, as follows:
PROPOSED ORDINANCE #2012-22 WITH LF&A-1 AMENDING CHAPTER 114 - VEGETATION,
ARTICLE II - WEEDS WITH LF&A #1 (COLLECTION OF GRASS CUTTING FEES)
COUNCIL MEMBERS ANNOUNCEMENTS
Council President Leary relayed birthday wishes to Councilwoman Williams and Mayor Carey.
Page 21
CITY COUNCIL MEETING OF OCTOBER 22, 2012 PAGE 21
Council President Leary noted the recent upgrade of the City’s electric revenue bond ratings to AA-
by the Fitch Group and congratulated staff on this development.
At the request of Mr. Bonar, Mr. Scott Koenig, City Manager, announced that leaf collection began
on October 15, 2012.
Mr. Bonar reminded members that Halloween was quickly approaching and that trick-or-treating
would be held between the hours of 6:00 p.m. and 8:00 p.m. on October 31, 2012. He asked that all
take safety precautions.
Mr. Anderson invited everyone to have lunch at the Lone Star restaurant on Sunday, October 28,
2012, and to mention Open Door Ministries, which is a organization which helps local people in
need to obtain necessary money, supplies, etc., to reach the next stage of their lives.
Mr. Hutchison moved for adjournment, seconded by Mr. Bonar and unanimously carried.
Meeting Adjourned at 7:57 P.M.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
October 22, 2012, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM/jg
S:\AGENDAS-MINUTES-PACKETS\Council-Minutes\2012\10-22-2012 COUNCIL.wpd