CITY OF DOVER HISTORIC DISTRICT COMMISSION
AGENDA
THURSDAY, September 20, 2012 - 3:00 P.M.
City Hall – Conference Room
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES OF MEETING on July 19, 2012
COMMUNICATIONS & REPORTS
1. Training Opportunities
OLD BUSINESS
NEW BUSINESS
1. Applications for Architectural Review Certification:
a. HI-12-06 Demolition of Building at 509 South State Street - Public Hearing and
Action on Architectural Review Certification for the demolition of the two-and-half
story residential dwelling located at 509 South State Street. The property is zoned
RGO (General Residence and Office Zone) and subject to the H (Historic District
Zone) and the SWPOZ (Source Water Protection Overlay Zone). The property is
located on the east side of South State Street just south of the intersection with Water
Street. The owner of record is the Rector, Wardens and Vestryman of Christ
Episcopal Church. The property address is 509 South State Street. Tax Parcel: ED-05-
077.09-05-45.00-000.
2. Presentation: Tax Credits for Historic Properties
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSION.
Page 2
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
JULY 19, 2012
The Regular Meeting of the City of Dover Historic District Commission was held on Thursday,
July 19, 2012 at 3:00 PM with Chairman Scrafford presiding. Members present were:
Mr. McDaniel, Mr. Fisher, Mr. Scrafford, and Mr. Salkin. Mr. Jackson was absent.
Staff members present were Mrs. Melson-Williams, Ms. Cornwell, and Mrs. Purnell.
APPROVAL OF AGENDA
Mr. Salkin moved for approval of the agenda as submitted, seconded by Mr. McDaniel and the
motion was unanimously carried 4-0 with Mr. Jackson absent.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF APRIL 19, 2012
Mr. Salkin moved to adopt the minutes of the regular Historic District Commission meeting of
April 19, 2012, seconded by Mr. McDaniel and the motion was unanimously carried 4-0 with Mr.
Jackson absent.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the first item on the Communications and Reports was a
summary of applications being tracked for the last two years. There were three projects considered
this year. Construction is still underway and almost completed at the Frankfurt Bakery. They are
scheduled to open on Friday, July 20, 2012. The Johnson Victrola Museum has not installed their
first banner. Wesley Church installed their first banner which was for the Vacation Bible School.
There has been some utility work at the North Street Lot where they are putting underground cable
and telephone connections. They are in the final stages of completing the Site Plan review
finalization so that they can start the parking lot and plaza aspects of the project.
Mr. Scrafford questioned if there were any problems? Responding to Mr. Scrafford, Mrs.
Melson-Williams replied that for some of the older projects such as the Duncan Plaza we have not
received anything current. They do have extensions that they can apply for through the Planning
Commission. If they don’t take action, it will expire.
Mrs. Melson-Williams stated that the Bayard Plaza is underway with the exterior and finishes. We
have been working with them as items arise with the project.
Mrs. Melson-Williams asked if there were any questions regarding the projects?
Mr. Salkin questioned if the double gate was higher than the fence at the church. The first time the
design was not approved and the second time it was not discussed. Responding to Mr. Salkin, Mrs.
Melson-Williams replied that it may have happened that way. The initial presentation to the
Historic District Commission was that everything was at the same height. The second one was not
discussed, but there is an arch. The project has not been closed out; they still have landscaping
Page 3
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
issues. The gate does have an arch. Mr. Scrafford also replied by stating that it was not in the gate
in the alley way. Mrs. Melson-Williams further replied and said that the gate in the alley has some
pickets on the top.
Mrs. Melson-Williams stated that the permits that occur in the Historic District are also tracked.
Some of them will have to appear before the Historic District Commission while others are Staff
approvals. To date, there have been twenty-seven (27) permits involving permits in the Historic
District. A majority of them are for signage: eleven (11) Sign Permits and six (6) Temporary Sign
Permits. For five of the twenty-seven (27) permits it is noted that while the property is in the
Historic District the location of the project may have been interior or not visible from the public
way. They technically do not need to have Architectural Review Certification, but they are listed.
The few Building Permits that are included on the list are interior renovations, minor porch and
deck work.
Mr. Scrafford questioned if the list included items that the Planning Office approves even though
they do not have to be reviewed? Responding to Mr. Scrafford, Mrs. Melson-Williams replied
that was correct. The Planning Office sees every Building Permit that is filed. Even though it may
not require Architectural Review Certification by Staff, it is on the list because the building is in
the Historic District.
Mr. McDaniel questioned if the new porch on 16 The Green that is being constructed at the current
time was not brought to the Historic District Commission because it was the exact and similar
porch? Responding to Mr. McDaniel, Mrs. Melson-Williams replied that was correct. They have
done other porch repairs because someone ran in one of the porches at one point.
Mr. McDaniel questioned if the project at the Art League, for example, would come to the
Planning Office? Responding to Mr. McDaniel, Mrs. Melson-Williams replied that it depends on
what is being done. There should be some things that they will be doing that she is aware of that
will require a permit. Mr. McDaniel further questioned if the Planning Office had to make the
determination? Responding to Mr. McDaniel, Mrs. Melson-Williams replied that the Planning
Office would have to make the determination.
Mrs. Melson-Williams stated that Preservation Delaware is holding an event the first weekend in
August. There are activities on Saturday and Sunday. The Saturday workshop focuses on the
Damaging Effects of Tree Roots on Building Foundations and Sidewalks. The Sunday workshop
focuses on New Castle and its History.
Mrs. Melson-Williams stated that she received an inquiry from a gentleman who is part of the
A&P Historical Society. This was the A&P grocery store. He had some indication that the City
Hall building was once the A&P grocery store. He was seeking additional information. If anyone
has information regarding the A&P grocery store, please see her after the meeting.
NEW BUSINESS
HI-12-04 Court Street Gateway Project – Presentation on Phase I: Court Street Gateway of the
Bicycle/Pedestrian Improvements Project. A presentation of the design concepts for bicycle and
2
Page 4
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
pedestrian improvements to widen the existing sidewalk along Court Street and South DuPont
Highway/U.S. Route 13 to serve as a shared use path. The segment located west of the St. Jones
River (the bridge on Court Street) is located within the Historic District zone.
Representative: Rich Vetter, Dover Kent County MPO; John Hermes, Century Engineering;
Anthony Aglio, DelDOT; Marco Boyce, DelDOT.
(Mr. Vetter utilized maps and graphics to present the information)
Mr. Vetter stated that the project started last fall and the intent of the project came from the MPO
Bike Plan. The intent is to connect the Silver Lake existing trail and the trail behind U.S. Route 13
and DelDOT. A lot of funding is needed for this project that will be set aside. The City was
involved in the working group and during the six (6) month process we developed different
alternatives. The initial Phase 1 is from Court Street to Route 13 to the signal. Phase 2 will be
from Loockerman Street to the State Archives property and then connect to the Court Street
project. The other part of Phase 2 would connect south in front of Legislative Hall to the St. Jones
River. The portion on the west side of the bridge is in the Historic District and the design has not
started. We wanted some input from the Historic District Commission before starting the design
process. This will be a DelDOT project. The intent is to widen the sidewalk along Court Street and
U.S. Route 13 to make it to make it a ten (10) foot wide shared use path. The concrete will have
brick accent on the east side of the river. We plan to improve the aesthetics and landscaping and
widen and match the sidewalk portion west of the St. Jones River which is in the Historic District.
The bridge is Historic and there is no intent to modify the bridge. The sidewalk on the bridge is ten
(10) to twelve (12) feet wide.
Mr. Scrafford questioned if the bricks on the photos were existing? Responding to Mr. Scrafford,
Mr. Aglio replied one was existing and one was a rendering. The rendering shows the middle
crossing in front of Legislative Hall.
Mr. Scrafford questioned if they were going to use real brick? Responding to Mr. Scrafford, Mr.
Aglio replied that they were asking the Historic District Commission what they would prefer for
them to use. They would use kiln fired brick with a tighter joint to match in color.
Mr. Vetter stated that there is existing brick today all the way to the Family Court then it becomes
concrete. There are three different styles of bricks in that short section.
Mr. Salkin questioned if he could clarify where the brick extension would be? Would it be brick to
the west of St. Jones River, brick on the existing bridge, and brick all the way to the Family Court
corner and then pick up with the concrete? Responding to Mr. Salkin, Mr. Vetter replied yes.
Mr. Scrafford questioned what depth of concrete was being discussed? Responding to Mr.
Scrafford, Mr. Vetter replied 4 inch sidewalk concrete.
Mr. Scrafford stated that his suggestion was that in the initial construction that the receptacles for
the bollards be installed because if you do not intend to put them in so that when do decide to put
them in it will already be there.
3
Page 5
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
Mr. Aglio questioned if cars will park in the location? Responding to Mr. Aglio, Mr. Scrafford
replied that he thinks that motorcycles will drive down the sidewalk and you will have people
using the ten (10) foot wide concrete strip. Signs will not be in your best interest because they are
unenforceable. He suggested thinking about what could happen on the ten (10) foot wide concrete
that you could prevent early on.
Mr. Aglio questioned if any of the bollards in the Historic District would need to conform to the
Historic District requirements? Responding to Mr. Boyce, Mr. Scrafford replied what was already
some in existence you would use the similar item. Also responding, Mrs. Melson-Williams replied
that there are some near the Courthouse, but she was not sure of the color. Some of them are
collapsible because it is a fire lane situation.
Mr. Aglio questioned if it was acceptable? Responding to Mr. Aglio, Mr. Scrafford replied yes,
the bricks sound acceptable.
Mr. Boyce questioned for the existing section (of the sidewalk) that is brick inside the District
would the Historic District Commission like for it to stay or to remove the brick and replace with
all new? Responding to Mr. Boyce, Mr. McDaniel replied that as a bicyclist he would prefer that
all the brick be removed. Also responding, Mr. Scrafford replied that you would like to make it
more in line with a smooth surface.
Mr. Scrafford questioned if they would be using existing brick? Responding to Mr. Scrafford,
Mr. Hermes replied that there are two options, you can try to use the existing brick, but what we
found is that majority of it is broken. It can be incorporated in with the new.
Mr. Scrafford stated that he would not have any objection to removing and replacing it to make it a
more acceptable surface.
Mr. McDaniel questioned if they would match the pattern? Responding to Mr. McDaniel, Mr.
Aglio replied yes. Mr. Scrafford stated that the pattern should be retained. Mr. Aglio questioned if
they would like a clear delineation between the new and the old brick. Responding to Mr. Aglio,
Mr. Scrafford replied that he did not have a problem with it; it just needs to be done from an
aesthetic point. Try to keep it historic and do not duplicate.
Mr. McDaniel questioned if the strip along and parallel to Route 13 was going to be just a
shoulder? Responding to Mr. McDaniel, Mr. Aglio replied that the entire sidewalk will be
widened. Mr. McDaniel questioned if the bikes would be away from the road? Responding to Mr.
McDaniel, Mr. Aglio replied that the bikes will still be permitted to use the shoulder on Route 13.
Mr. Salkin questioned that as a bicyclist he may not want to use that path, he may just want to stay
on Route 13, will he still be permitted to do that? Responding to Mr. Salkin, Mr. Aglio replied that
the sidewalk will be widened all the way to Route 1.
Mr. Salkin questioned if there was a concept for design and material for Phase 2? Responding to
Mr. Salkin, Mr. Aglio replied yes, there is a standard for the urban area. Mr. Salkin questioned if
they would go back and redo the items that are currently there. Responding to Mr. Salkin, Mr.
Aglio replied no, there was no intention of going back in that area.
4
Page 6
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
Mr. Scrafford questioned if they had come across any studies that had been done in the new area?
He stated that he remember Jack Ritcher doing an extensive study on the entire path. Responding
to Mr. Aglio replied that he had spoken to Mr. Ritcher and there were some property owners there
(at the workshops). Also responding Mr. Vetter replied that they had the previous study. Mr.
Scrafford questioned if the boat ramp was still there? Responding to Mr. Scrafford, Mr. Aglio
replied yes.
Mr. Hermes questioned if the Historic District would have a problem with them removing the
brick that was near the existing bridge and sidewalk area and making it consistent with the rest of
the way? Responding to Mr. Hermes, Mr. Scrafford replied no, it would be nice. It would be better
to have it all consistent. Mr. Hermes stated that it will be investigated to see how the bricks are
actually tied down to the bridge.
Mr. Vetter stated that Century Engineering will begin the design as the next step in the project. The
surveyor will be out in the fall. Construction will start summer or fall of 2013. They would like any
comments the Historic District Commission has regarding the project.
HI-12-05 Building Permit #12-816 for Renovations for ADA Accessibility at Supreme Court
Building, 55 The Green - Referral by the City Planner to the Historic District Commission for
Review of Architectural Review Certification for Building Permit application #12-816 for ADA
accessibility improvements at 55 The Green (Supreme Court Building) consisting of new ramp
and steps to the west entry. Property Owner: State of Delaware. Tax Parcel:
ED-05-077.09-05-32.00-000.
Enhancements to the East Edge of The Green & Court Street Promenade Project –
Presentation on site improvements within the right-of-way of The Green and Court Street
(unopened segment) authorized under City of Dover Public Works Permit 2013-0001.
Mrs. Melson-Williams stated that this is a Building Permit application that was filed and the
Planning Staff used the section of the Code that allows them to refer Building Permits that are
seeking Architectural Review Certification to refer it to the Historic District Commission for
consultation. We chose this because of the building’s location and they are making some
significant changes to the area in front of the building. The permit for the Supreme Court Building
focuses on the existing ramp system that gets you into the building. This project actually removes
the existing system and builds a new ramp system into the building and reworks the walls and
landscaping. It is part of a much larger project which is referred to as “Enhancements to the East
Edge of The Green & Court Street Promenade Project”. Most of the project is in the right-of-way
of The Green and Court Street (unopened segment) authorized under City of Dover Public Works
Permit 2013-0001.
Representatives: Mr. Tim Slavin, Division of Historical & Cultural Affairs; Mr. Scott Schurman,
Roberts Construction Company; Ms. Lynn Riley, Division of Historical & Cultural Affairs; Mr.
Timothy Cassidy, Bernardon Haber Holloway Architects
5
Page 7
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
(A series of presentation drawings were utilized to explain the projects.)
Mr. Slavin stated that these improvements also consisted of the project on 15-21 The Green, the
Kirk Short Building. Looking outward from the facade of the building we saw the need to correct
some inefficiency and increase the safety in the First State Heritage Park area. There are safety
issues related to ADA. The ramp at the Supreme Court Building is dangerous. If you could
imagine being someone who relies on a wheelchair then you would need a very good braking
system on that ramp. If you did not have good brakes on your wheelchair you could go off the edge
of the ramp and down the hill. They also want to improve the steps. They have been working at
15-21 The Green for the last eight (8) years and it looks as if each individual project that has come
along over the course of the last thirty (30) years took care of its landscaping in front of the
building. There is a patch of items that have occurred that lacks the signature that they want to see
on the other side of the green.
Mr. Cassidy stated that in the 1970’s there was a large renovation done on the (Supreme Court)
Building with that being the curbed portico coming into the ceremonial entrance to the Court along
with the planter that runs in front of the entire building. Although the central area is the
ceremonial entrance, on a day- to- day basis if the Court is not in session and you need to go there
for business you actually have to go to a security door entrance with security cameras and glass if
you were to go into the Court. It is also the accessible entrance that has the automatic openers and
closers on the doors. For the ramp to the far south side of the building, you will have to go around
the corner as if you were going to the new courthouse and start down the hill and then turn around
and double back up to go up the ramp. If you needed to use the ramp in a wheelchair you would go
to the far side of the building and make a 90º degree turn and go up the side, but there is one step in
the middle that you cannot see. It is even dangerous if you are walking. It is a hazard and is not in
compliance with ADA standards in terms of the slopes. There is nothing there to indicate that you
need to make a turn. In addition to coming up to the front of the Supreme Court Building, there is
no way to get into the building if you disabled. There are no signs.
Mr. Cassidy stated that they are proposing to remove the planter wall, expose the front of the
building and create a new front stoop with steps in front of it that will lead back out to the walk
way. It will make a ramp that is concealed behind the low wall that runs parallel from the
ceremonial entrance point in the center back to the secured and accessible entrance. The low wall
with a level top will appear to be a part of the watertable of the building and the ramp will be
concealed behind it. There will be a stoop with steps coming down and a walkway coming up.
The building will then have a more traditional relationship to the street and the sidewalk. When
you walk in front of it in the future instead of having planters and shrubs which hide the front of the
building and entrance, you will be able walk right up to the entrance. They are also proposing
new landscaping. The proposal will be constructed out of brick which will match the building and
we plan to remove the granite cap and then reuse them to recap the new cheek wall on the side of
the steps.
6
Page 8
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
Mr. Scrafford questioned if they had enough distance to accommodate the ADA ramp?
Responding to Mr. Scrafford, Mr. Cassidy replied yes. They have already been before the
Architectural Review Accessibility Board and have approval for the project. Therefore there are
no ADA issues and they are incompliance.
Mr. Scrafford questioned if they needed ADA access for the ceremonial entrance? Responding to
Mr. Scrafford, Mr. Cassidy replied no. Mr. Scrafford asked if the ceremonial entrance would be
used? Responding to Mr. Scrafford, Mr. Cassidy replied that the only time the ceremonial
entrance would be used is if the Court is open for sessions. Mr. Scrafford questioned if
handicapped persons have the ability to access the building through the ramps? Responding to
Mr. Scrafford, Mr. Cassidy replied that is correct, that is the actual business entrance for the
building.
Mr. McDaniel questioned the signage on the building if the door is locked? Responding to Mr.
McDaniel, Mr. Cassidy replied that there is no signage. They are proposing to make it an easy and
understandable entrance. This will be more in keeping with the traditional relationship of the
building to the street rather than having the planter and shrubs out front.
Mr. Salkin questioned if they could explain if any treatment will be needed on the existing
foundation? Responding to Mr. Salkin, Mr. Cassidy replied that it will all get re-pointed. There
will be new landscaping with a traditional low hedge of yews about 24” to 30” tall with a grass area
that is established on either side of the front entrance. These plants were selected because this is a
very high traffic area as well as a place that is not for plant material.
Mr. Fisher questioned if the wide expansion of the walkway will be gone with the new proposal on
The Green side? Responding to Mr. Fisher, Mr. Cassidy replied no. This will all be retained
completely. Court Street used to come from Federal Street straight up to The Green. Also
responding Mr. Slavin replied that the only area where brick will be removed will be in front of the
Kirk-Short building. They will be creating some green space in that area.
Mr. Salkin questioned if any trees beyond the six (6) new large trees would remain? Responding to
Mr. Salkin, Mr. Cassidy replied correct. They lost a few of the trees since the drawing was made,
because the City has a requirement that for any location that has water and storm sewer pipes in the
ground you will need to have at least ten (10) feet of clearance between the tree and shrubs. They
still have the trees in front and two of the trees were replaced with shrubs instead of trees. Mr.
Salkin questioned if anything was being removed? Responding to Mr. Salkin, Mr. Cassidy
replied that the three (3) small trees that are currently in front of the Supreme Court will be
removed because they are located where the new walk ways are going. The large trees that go
anywhere on The Green will not be removed.
Mrs. Melson-Williams stated that Staff found the ramp system and the entry steps utilize the
compatible materials and the design would be compatible with the Design Guidelines that
7
Page 9
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
recommend that you screen the slope of the ramp. The use of the brick is appropriate in the
Historic District.
Mr. Scrafford asked if there were any questions for Staff and there were none.
Mr. Salkin made a motion to endorse application HI-12-05 as being consistent with the Historic
District Guidelines, seconded by Mr. Fisher and the motion was unanimously carried 4-0. Mr.
Jackson was absent.
Mr. Cassidy stated that the gray area shown on the plan is existing walkways that will remain. In
the reddish area, there will be new walkways or walkways that are being reconstructed. In front
of the State House we will be pulling up the bricks and relaying them because the slope of the ramp
is not incompliance with ADA Standards. Today there is no walkway in that area around The
Green. On the left side of The Green you have the walkway that goes all the way around and there
is roughly a six (6) or seven (7) foot wide grass strip or planting strip between the curb and the
sidewalk and the trees are planted around the edge. They are going to continue the historic pattern
that would provide connectivity to various buildings as you move around the space. Because there
are steps in that location and the slopes are incorrect, they will try to make it as clean and elegant as
possible and still be incompliance with Building Codes and ADA Regulations.
Mr. Cassidy stated that in terms of the bigger project there will be a Promenade connection that
will be a new brick walkway that will take you from The Green to Federal Street. It will be strictly
for pedestrians no vehicles.
Mr. Scrafford questioned how would he stop the vehicles? Responding to Mr. Scrafford, Mr.
Cassidy replied with bollards. Mr. Scrafford questioned if they were removable bollards?
Responding to Mr. Scrafford, Mr. Cassidy replied yes.
Mr. McDaniel questioned if the bollards would go where the existing walkway is located?
Responding to Mr. McDaniel, Mr. Cassidy replied no, it will go in the center of the right-of-way.
There are existing light poles in the area that will remain on either side illuminating the walkway.
Mr. Fisher questioned if the walkway would be further south? Responding to Mr. Fisher, Mr.
Cassidy replied yes, it will be center line of the right-of-way.
Mr. Cassidy stated that they will be using real brick pavers.
Mr. McDaniel questioned if they were doing the parking lot behind the O’Neil Building?
Responding to Mr. McDaniel, Mr. Cassidy replied that in order to extend the walkway out they
need to remove the entrance from Federal Street. Once that is done, you can no longer have the
parking lot function as a one way parking lot. The new entrance and exit from the parking lot will
be to the south. The number of parking spaces will remain the same.
8
Page 10
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
Mr. McDaniel questioned who uses the parking lot? Responding to Mr. McDaniel, Mr. Slavin
replied that there are two reserved spaces for the Supreme Court and two reserved spaces for
people who work in the O’Neil Building, one (1) for Counsel, one (1) for the Analysis Center, four
(4) handicap spaces, and eight (8) unassigned spaces.
Mr. Scrafford questioned if the base bid line includes out into the curb and if any work will be done
in that area or is all the work behind the curb line. Responding to Mr. Scrafford, Mr. Cassidy
replied that there are three (3) locations and there is no accessible curb cut ramp to come in off the
street to any of the area. There are depressed curb cuts today in the area, but they don’t go
anywhere. The walkways were never built.
Mr. Scrafford questioned if it was the Blue Mountain Stone curb with the four (4) or six (6) foot
length? Responding to Mr. Scrafford, Mr. Cassidy replied that currently the entire curb line along
the edge is concrete. They will be saw cutting it in a few places to put the new depressed curbs
areas in to make the excess ways. When it gets replaced the area will also be concrete. They had
talked about the possibility of doing all out of granite, but when we looked at the area there is no
elegant way to end it. If you take the granite around you would never get back to the granite, you
would only run into concrete. There is concrete everywhere. Therefore, they are matching what is
there.
Mr. Fisher questioned if currently the walk out from the Supreme Court building just went to the
curb and that there is no ramp? Responding to Mr. Fisher, Mr. Cassidy replied that is correct.
There will be three (3) areas of depressed curbs. If you are disabled you will be able to get in off the
street regardless of the location.
Mr. Fisher questioned if they would need to redo the extension to the Biggs Museum as part of the
walkway? Responding to Mr. Fisher, Mr. Cassidy replied that there will be an extension and they
will be connecting to the existing walkway that is remaining to the Biggs Museum. Mr. Fisher
questioned if it would all be brick until you get to the steps? Responding to Mr. Fisher, Mr.
Cassidy replied yes.
Mr. McDaniel stated The Green is a treasure of Dover. When you come to The Green there are no
street signs that state The Green. When you turn off of State Street towards The Green either
direction there is only a one way sign. The only sign that states The Green is when you come
from west to east at the Bank Lane intersection.
Mr. Scrafford stated that there were a lot of problems with signage in the past when they did State
Street and The Green and trying to arrive at signs that were acceptable to the State of Delaware, the
Historic District, and the City of Dover.
Mr. Slavin stated that part of our historic preservation concerns is not just about the building
environment, but also the archeological environment. They have tested these sites and we know
that there are some sensitive areas. They will have monitoring during the construction. Part of our
9
Page 11
CITY OF DOVER HISTORIC DISTRICT COMMISSION JULY 19, 2012
vision for the area which may not be in the Historic District Commission’s jurisdiction is a more
safe and meaningful cross over on Federal Street where the long sidewalk will be terminated. The
other vision is the circle in front of the Biggs Museum. It is not of the highest utility and they feel
that they could reconfigure it into more of a civic space that you typically see around an Art
Museum.
Mr. Scrafford questioned if there was a plan regarding the circle in the past? Responding to Mr.
Scrafford, Mr. McDaniel replied that when the Downtown Dover group did their parking lot it was
supposed to be supervised.
Mr. Slavin stated that he thought the project was a great plan.
Mr. Scrafford stated that the area needs to be more user friendly.
Mr. Scrafford questioned what type of impact does the depressed sidewalk have on parking? Are
we losing parking spaces around the area because you now have handicap access from the curb
cuts? Responding to Mr. Scrafford, Mr. Cassidy replied that there will probably be a net loss of
one (1) space. That is something that they will have to coordinate with the City in terms of how
that area get line striped. It is at their discretion to either elect to respect those as areas where
people are not to park or whether or not they would just allow people to park there.
Mr. Scrafford questioned if they would ask for handicap parking on The Green in the vicinity of
the depression? Responding to Mr. Scrafford, Mr. Cassidy replied at the discretion of the City. We
will continue to have discussions with the City and make some recommendations of how it could
work. Also responding, Mr. Fisher replied that there is handicap parking on one side.
Mr. Fisher questioned that there was nothing that could prevent the City of having a handicap
parking space in front of the building? Responding to Mr. Fisher, Mr. Cassidy replied correct
because it is their right-of-way.
(This project was an informational presentation to the Commission and did not require formal
action.)
Mr. Salkin moved to adjourn the meeting, seconded by Mr. Fisher and the motion was unanimously
carried 4-0. Mr. Jackson was absent.
Meeting adjourned at 4:19 PM
Sincerely,
Maretta Savage- Purnell
Maretta Savage- Purnell
Secretary
10
Page 13
City of Dover
ARCHITECTURAL REVIEW STAFF REPORT
Before Dover Historic District Commission
September 20, 2012
Project Name: Building at 509 South State Street: Building Demolition
Location: East side of South State Street south of the intersection with Water
Street
509 South State Street
Tax Parcel: ED-05-077.09-05-45.00-000
Property Owner: The Rector, Wardens & Vestrymen of Christ Episcopal Church
Present Zoning: RGO - General Residence and Office Zone
H - Historic District Overlay Zone
SWPOZ – Source Water Protection Overlay Zone* (*Exempt from
Tier 3 provisions due to Downtown Redevelopment Target Area
location. Zoning Ordinance, Article 3 §29.79)
Present Use: Vacant Building (Previous residential use)
Proposed Use: Vacant site
File Number: HI-12-06
PROJECT DESCRIPTION:
The Historic District Commission will act on an Architectural Review Certificate regarding
Demolition of the two-and-half story residential dwelling located at 509 South State Street. The
property is zoned RGO (General Residence and Office Zone) and subject to the H (Historic
District Zone) and the SWPOZ (Source Water Protection Overlay Zone). The property is located
on the east side of South State Street just south of the intersection with Water Street. The owner
of record is the Rector, Wardens, & Vestrymen of Christ Episcopal Church. The property
address is 509 South State Street. Tax Parcel: ED-05-077.09-05-45.00-000.
Property Information
This building is located within a National Register Historic District, specifically the Dover Green
Historic District. It is a listed as a contributing resource of this National Register Historic
District. Provided below is the building summary from the building inventory listing found
within the National Register nomination completed for the Dover Green Historic District
(nomination completed 1973-76, amended 1979, 1984). The building is identified as K-375 and
K-394.75 in the Delaware Cultural Resource Survey.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 14
HI-12-06 Building at 509 South State Street: Building Demolition
Architectural Review Staff Report for Historic District Commission
September 20, 2012 Meeting
K-394.75 509 S. State St. – 19th century; frame, 2 ½ story, 3 bay. This dwelling has a
gable roof and box cornice. There is a large bracketed pediment with a cornice return
above the door. The chimney pots are rounded. On the south side is a 1-story, 1-bay
addition. The structure is covered in aluminum siding. (c)
The property is located within H (Historic District zone) as established by the City of Dover.
A series of historic maps were reviewed by Planning Staff for preliminary information on this
block of South State Street. The 1859 A.D. Byles Map of Kent County (Dover insert) shows a
series of dwellings fronting this east side of South State Street with Christ Church further to the
east. This building owned by H. Pratt who is also shown as the property owner on the 1868 Beers
Map published by Pomeroy & Beers. This block of residences continues to be shown on the
1885 Bird’s Eye View of Dover and the 1887 Map of the Town of Dover by W.R. Roe which
shows the property owner now as Jno. S. Kiefer.
The series of Sanborn Fire Insurance Maps is also a reference source for information on the
buildings which occupied this property over time. The 1897-1929 Sanborn Maps series show this
property with a two-and-a-half story house with a one story addition on the south and a variety of
one story additions to east side of the building. This map series also shows the neighboring
properties and the changes associated with the neighborhood. In the neighborhood, the first
house at the corner of South State Street and Water Street disappears between1910-1919
(location now part of the brick walled cemetery) and the residences along Elm Terrace are
beginning to develop by 1929.
The building at 509 South State Street is currently vacant. Previously, a detached garage
structure on this property was demolished in 2009 following property maintenance violations
identified by the Inspections Department - Code Enforcement Division. The neighboring
dwelling to the north was demolished in 2001 following fire damage. The two dwellings to its
south were demolished sometime in the mid-twentieth century (prior to 1991 as determined by
aerial maps). The only other surviving building of the block is the late eighteenth century
building at 527-529 South State Street known as the John Banning House (Old Academy).
SWPOZ (Source Water Protection Overlay Zone)
A portion of the site is located within the SWPOZ (Tier 3: Excellent Recharge Area) found in
Article 3 Section 29.7 of the Zoning Ordinance. However, this project site is within the downtown
redevelopment target area which is exempted from the SWPOZ requirements and restrictions as per
Zoning Ordinance, Article 3 §29.79.
PROJECT PROPOSAL for Demolition
The applicant has supplied a Report consisting of a narrative and photographs about the property
at 509 South State Street. See attached Report. The Report includes the project proposal,
property history, property survey, contractor’s evaluation of the building, interior and exterior
photographs, and seeding plan. The proposal is described below:
1. Demolition of Building: The proposal involves the demolition of the existing two-and-a-
half story frame dwelling and its additions with all demolition materials removed from
the site and disposed. The building area is proposed for vegetative seeding (grass lawn
area). There are no plans to build on the property only to have it become part of the
2
Page 15
HI-12-06 Building at 509 South State Street: Building Demolition
Architectural Review Staff Report for Historic District Commission
September 20, 2012 Meeting
adjacent undeveloped open space held in church ownership.
Review of DESIGN STANDARDS AND GUIDELINES
The subject property is located in the Dover Historic District Zone within The Green Historic
Context. The Green Historic Context is described on pages 2-3 through 2-5 of the Design
Standards and Guidelines. Location within the Dover Historic District Zone requires proposals
for specific types of construction activities such as new construction, additions to existing
buildings, exterior renovations, and demolition of buildings to receive an Architectural Review
Certificate. The Architectural Review Certification process allows for the evaluation of the
merits of proposed projects in regards to the goals of the Historic District zone.
The following general recommendation is provided for the preservation of the historic character
within The Green Historic Context (page 2-5):
Demolition of historic structures within the Green historic context should not be permitted
under any circumstance and should be avoided unless a threat to public safety.
Demolition
The proposal for demolition of the building must be reviewed for conformity with the design
criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation.
The Design Standards and Guidelines discuss the issues related to demolition within the Historic
District. The Design Standards and Guidelines gives guidance to the Historic District
Commission by listing specific criteria to be evaluated when considering applications for the
demolition of buildings (or portions of buildings) in the historic district. (Chapter 4: pages 4-10
to 4-12) These guidelines are summarized below (see Design Standards and Guidelines for the
complete text).
1. Determine the financial implications of maintaining a property versus demolition.
2. Regardless of economic issues the relative significance of the individual buildings
slated for demolition should be evaluated.
3. In development related applications the City should review the schematic plans for
the new structures to weigh the virtues of the new structure versus what exists.
4. Determine the extent of adequate recordation of a property the applicant would be
required to complete if demolition were approved.
5. Lots left vacant by demolition should be treated in a manner that is sympathetic to
the historic context.
STAFF COMMENTS AND RECOMMENDATIONS
The following are the Staff comments and recommendations for this application regarding
project activities for demolition of the Building at 509 South State Street and issuance of an
Architectural Review Certificate.
1) The Design Standards and Guidelines outline specific criteria to be evaluated in considering
demolition applications (page 4-10 and 4-12).
a) The application, as submitted, contains information on the applicant’s reasoning for
demolition of the Building at 509 South State Street. Additional information may be
3
Page 16
HI-12-06 Building at 509 South State Street: Building Demolition
Architectural Review Staff Report for Historic District Commission
September 20, 2012 Meeting
received at the Historic District Commission meeting from the applicant’s presentation
and during the public hearing.
2) Staff does not recommend demolition of this building at 509 South State Street thus
recommending that the Architectural Review Certification be denied. The building is one of
the few remaining historic buildings dating to eighteenth and nineteenth century in the Historic
District south of Water Street. This mid-nineteenth century building is part of the historic
streetscape as you approach The Green from the south. The building helps to establish the
architectural character of the area. Its removal with impact the streetscape. While some
integrity has been lost with the application of modern exterior finishes in the aluminum siding
and storm windows, the overall massing, form, and proportions of the building remain. The
building could be restored or rehabilitated.
3) Staff notes the opportunities for preservation of the building should be considered. There are
tax credit programs and other grants, incentives, or loan programs that may assist in project
costs for an adaptive reuse project to restore or rehabilitate the building. The appropriate
steps to stabilize and ‘mothball’ the building or the relocation of the building could also be
options for consideration.
4) Staff notes that some documentation of the existing building has occurred in the form of a
series of interior and exterior photographs (photos) and in the form of the history research
included in the application submission. The Historic District Commission may require
additional documentation and recordation of the building if deemed appropriate.
a) If demolition is unavoidable then, given the mid-nineteenth century age of the building,
the building should also have additional documentation completed in the form of
measured drawings of the building’s floor plans. This should include other data gathering
on the building’s construction.
b) A series of photographs of the building’s exterior and interior should be systematically
completed to include keyed location map of photographs.
5) If approval for demolition of the building is granted, Staff recommends the following
conditions pertaining to the building demolition and site stabilization. These conditions are
presented in an effort to improve the project’s compliance with the recommended guidelines
for consideration of demolition in the Design Standards and Guidelines and other code
provisions:
a) A specific timeframe for demolition activities and site stabilization should be established.
b) All utilities must be properly capped and/or abandoned.
c) Clarify the plan for site stabilization of the site.
i) The building footprint area following demolition of the building and removal of the
basement foundation walls must be restored to grade. The disturbed area is to include
stabilization with topsoil and seeding to establish a grass lawn area. The grass lawn
area is to be properly maintained.
d) Staff does not recommend installation of solid (opaque) fencing or chain link fencing on
the site. If areas need to be segregated on the site, other alternative fence styles may be
more appropriate.
e) Off-street parking is not permitted on the site.
4
Page 17
HI-12-06 Building at 509 South State Street: Building Demolition
Architectural Review Staff Report for Historic District Commission
September 20, 2012 Meeting
6) As the subject property at 509 South State Street and adjoining properties to the north and
south held in the same ownership, it presents an opportunity for planned landscaping. It is
recommended that a series of street trees be planted on the property just east of the street
frontage sidewalk. The trees will help to create a streetscape edge for the properties which
lack buildings. Suggestions of trees species for planting in a urban setting can be
recommended by the City’s Arborist.
ADVISORY COMMENTS:
1) In the event, that major changes and revisions to the project proposal occur, contact the
Department of Planning and Inspections. These changes may require resubmittal for review
by the Historic District Commission.
2) The building at 509 South State Street is required to be registered as a Vacant Building under
the provisions of Dover Code of Ordinances, Chapter 22 Article XII. Vacant Buildings.
Contact the Department of Planning & Inspections Code Enforcement Division for
information at 736-7010.
3) The applicant shall be aware that a Demolition Permit is required to proceed with any
demolition activities on the property should Architectural Review Certification be granted for
the demolition proposal. The Demolition Permit application must comply with the conditions
of approval granted through the Architectural Review Certification process. A certificate of
asbestos survey and abatement must be submitted with the Demolition Permit application.
4) Any future construction activities such as redevelopment of the site for a building or other
facilities are subject to additional review processes for permitting and plan review.
5) The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on this property. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing with
archaeological resources including previous studies at the subject location.
Historic District Commission Action Required
The Historic District Commission shall consider the proposal and take action in regards to the
Architectural Review Certification for the demolition proposal. The action should reflect
consideration of the Design Standards and Guidelines.
5