Page 1
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on September 10, 2012 at 7:30 p.m. with Council President
Leary presiding. Council members present were Mr. Lynn, Mr. Perza, Mr. Bonar, Mrs. Williams,
Mr. Hare, and Mr. Hutchison. Mr. Anderson and Mrs. Russell were absent.
Council staff members present were Police Chief Hosfelt, Mrs. Mitchell, Mrs. Townshend,
Mr. Koenig, City Solicitor Rodriguez, and Mrs. McDowell. Mayor Carey was also present.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Leary declared the Open Forum in session and reminded those present that
Council was not in official session and could not take formal action.
Pastor Gregory Gordon, 54 S. New Street, shared the success of the First Annual New Street Block
Party held on August 28, 2012. He noted that the community came together, along with City staff
and other supportive local groups, businesses, and individuals to share and celebrate positive changes
in the community.
The invocation was given by Councilman William F. Hare, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda, seconded by Mr. Bonar and unanimously
carried.
Mr. Leary requested that Item #8D - City Planner’s Report, be removed from the Consent Agenda.
Mr. Lynn requested that Item #6C - Safety Advisory and Transportation Committee Report of
August 29, 2012 - Update - Dover High School Construction be added to the Consent Agenda.
Mrs. Williams moved for approval of the Consent Agenda, as amended, seconded by
Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and Mrs. Russell absent).
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF AUGUST 27, 2012
The Minutes of the Regular Council Meeting of August 27, 2012 were unanimously approved
by motion of Mrs. Williams, seconded by Mr. Bonar and bore the written approval of
Mayor Carey.
REZONING REQUEST - PUBLIC HEARING/FINAL READING OF PROPOSED
ORDINANCE #2012-19
A public hearing was duly advertised for this time and place to consider the rezoning of property
located at 870-872 Forest Street (on the south side of Forest Street east of Gibbs Drive), consisting
of 0.747+/- acres, owned by Bennie L Smith. This property is currently zoned
C-PO (Commercial/Professional Office Development District) and subject to the COZ-1 (Corridor
Overlay Zone) and the proposed zoning was C-1A (Limited Commercial) and subject to the
COZ-1 (Corridor Overlay Zone). (TAX PARCEL: ED-05-076.12-01-08.00-000, FOURTH COUNCIL DISTRICT;
PLANNING REFERENCE: Z-12-02)
Page 2
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 2
Mr. Hare moved that the final reading of the proposed ordinance be acknowledged by title
only, seconded by Mr. Bonar and unanimously carried. (The First Reading of Ordinance
#2012-19 was accomplished during the Council Meeting of July 23, 2012.)
Planner's Review
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed the
petition to amend the zoning district and the findings and recommendations of the Planning
Commission. She noted that the Planning Commission recommended approval of the rezoning
request. Mrs. Townshend advised members that the purpose of the rezoning was to allow retail on
the site.
Public Hearing
Council President Leary declared the hearing open.
Mr. Phil McGinnis, McGinnis Commercial Real Estate Compnay, 555 E. Loockerman Street, stated
that he was present representing Mr. Smith in the rezoning and they were pleased that both the staff
and Planning Commission were in favor of the rezoning.
Ms. Faye D. White, 101 Babb Drive, stated that she was in favor of the rezoning because it would
be an asset to the community and would bring jobs to the area.
Council President Leary declared the hearing closed.
Mr. Hare moved for approval of the rezoning request, as recommended by the Planning
Commission. The motion was seconded by Mrs. Williams and by a unanimous roll call vote
(Mr. Anderson and Mrs. Russell absent), Council adopted Ordinance #2012-19, as follows:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 870-872 FOREST STREET
WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property within
the limits of the City of Dover; and
WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use of
property described below from C-PO (Commercial/Professional Office Development District) and
subject to COZ-1 (Corridor Overlay Zone) to C-1A (Limited Commercial Zone) and subject to
COZ-1 (Corridor Overlay Zone).
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
DOVER, IN COUNCIL MET:
1. That from and after the passage and approval of this ordinance the Zoning Map and Zoning
Ordinance of the City of Dover have been amended by changing the zoning designation from
C-PO (Commercial/Professional Office Development District) and subject to COZ-1
(Corridor Overlay Zone) to C-1A (Limited Commercial Zone) and subject to COZ-1
Page 3
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 3
(Corridor Overlay Zone) on that property located at 870-872 Forest Street (on the south side
of Forest Street east of Gibbs Drive), consisting of 0.747+/- acres, owned by Bennie L. Smith.
(Tax Parcel: ED-05-076.12-01-08.00-000; Planning Reference Z-12-02; Council District 4)
ADOPTED: SEPTEMBER 10, 2012
PUBLIC HEARING - VIOLATION OF THE DANGEROUS BUILDING ORDINANCE -
126 N. ANN AVENUE, OWNED BY JESSE L. WORKMON
A public hearing was duly advertised for this time and place to consider a violation of
the Dangerous Building Ordinance at 126 N. Ann Avenue, owned by Jesse L. Workmon.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, explained that
the property was a one-story, wood framed, single-family home. The dwelling was condemned as
unfit for human habitation on April 4, 2012 due to the degree of damage to the structure from a fire
that occurred on the night of October 5, 2010. Since the fire, numerous windows to the structure
have been broken, causing the owner to have all windows and doors boarded. Currently the structure
was still vacant, with no active utility services and in a serious state of disrepair.
Mrs. Townshend reviewed a presentation depicting the condition of the structure (Exhibit #1).
Staff recommended that City Council take the following action for property located at 126 N. Ann
Avenue: 1) declare this building and all accessory structures on this property dangerous; 2) order
the property repaired or demolished by October 10, 2012 by the owner or equity owner at their own
risk; 3) order the Building Inspector to cause the repair or demolition of the structures if not
completed by the owner within 10 days of the date established by City Council; and 4) order the City
Manager, with the assistance of the City Solicitor, to cause the cost of repairs or demolition to be
charged against the land on which the building exists as a municipal lien or cause such cost to be
added to the tax duplicate as an assessment, or to be levied as a special tax, or to be recovered in a
suit at law against the owner.
Mrs. Townshend noted that she spoke with the owner, his attorney, and a prospective buyer earlier
in the day and they all confirmed that a contract for the purchase of the property was being prepared.
The prospective buyer intended to rehabilitate the house. She recommended changing the repair or
demolish date from October 10, 2012 to November 10, 2012 based on the possible sale of the
property. Mr. Hare suggested keeping the October 10, 2012 date because there was currently no
contract.
Council President Leary declared the public hearing open and, there being no one present wishing
to speak, the public hearing was closed.
Mr. Bonar moved that the structure located at 126 N. Ann Avenue be declared a dangerous
building and ordered that the property be demolished or repaired by October 10, 2012, in
accordance with the process recommended by staff. The motion was seconded by
Mr. Hutchison and carried by a unanimous roll call vote (Mr. Anderson and Mrs. Russell
absent).
Page 4
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 4
UTILITY COMMITTEE REPORT - AUGUST 27, 2012
The Utility Committee met on August 27, 2012 with Chairman Bonar presiding.
Annual Review and Approval of Governing Policy for Energy Commodity Risk Management
(Deferred by Committee on August 13, 2012 Pending Further Information)
During their meeting of August 13, 2012, members reviewed the Governing Policy for Energy
Commodity Risk Management. Due to questions and concerns of members, this matter was deferred
to allow staff the opportunity to respond. Members reviewed the following documents: 1) Two (2)
pages from the 2011 Comprehensive Annual Financial Report (CAFR) for the City of Dover;
2) Counterparty Credit Risk as of 6/29/2012; 3) Dover Monthly Credit Report for August 2012; and
4) Governing Policy for Energy Commodity Risk Management (provided at the August 13, 2012
Utility meeting and included again in this meeting packet).
Referring to Page 13 of the Governing Policy, Mr. Scott Koenig, City Manager, noted the statement,
“At no time will the City incur a credit exposure with any counterparty greater than $60,000,000.”
He explained that the City now has several counterparties (approximately 11) and that the $60M
limit was based on having only a few counterparties. He also advised members that in order to
obtain a $60M credit limit, a triple A bond rating would be required. As detailed on the information
provided regarding the Counterparty Credit Risk, he noted that if those individual amounts were
totaled, the City’s exposure would be significant. He stated that the amount of power (power
hedges) that the City purchased last year totaled approximately $40M and that in years past, the City
has purchased as much as $70M-$80M. It was his feeling that since the cost of power was
decreasing, the City’s exposure on the hedges was coming down, and the per counterparty exposure
was decreasing (due to the City developing several counterparty agreements).
Mr. Koenig requested that the $60M limitation remain in the Governing Policy for this year and that
the matter be reviewed again in the next year. He anticipated this issue being considered again in
April or May of 2013 to prepare for Fiscal Year 2014. He explained that the amounts included in
the Governing Policy were based on the risk associated with the counterparty. Mr. Koenig stated
that the City’s liability per counterparty must be reflected in the CAFR and felt that this was being
reported very transparently. He reiterated that staff would review this matter over the next 12
months and would specifically ask The Energy Authority (TEA) if the number should be adjusted
in the Policy at that time.
The Committee recommended approval of the Governing Policy for Energy Commodity Risk
Management, as presented.
By consent agenda, Mrs. Williams moved for approval of the Committee's recommendation,
seconded by Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and
Mrs. Russell absent).
Update - Green Energy Funding and Programming
Mr. Scott Koenig, City Manager, reviewed an update on the Green Energy Funding and
Programming. He stated that $802,265.68 had been collected since the City developed the Green
Energy component of the bill. He advised members that the program involves an application
process, an approval process, and a reimbursement process, and reimbursement often takes a
Page 5
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 5
significant amount of time. Mr. Koenig advised members that some applications from 2011 had not
been completely paid off. Due to this backlog, the City has not accepted any new grant applications
and is waiting for the funding stream to catch up, when grants will be opened to interested parties.
Responding to Mr. Bonar, Mr. Koenig stated that it was his recollection that the waiting list for
reimbursement under the program was “a couple of years” and stated that he would obtain the exact
timeframe.
Mr. Koenig explained that the second component of the program involved a large sum of money
reserved by the City for reimbursement for green energy improvements to the Library. He stated that
the City would be making application to the fund. He reminded members that the City made
application last fall in the amount of $48,267; half of these funds were available for others who
applied for a grant, and the remaining half was reserved (as authorized by the City) for City of Dover
projects.
Update - Garrison Oak Technical Park Project
Mr. Scott Koenig, City Manager, stated that the Performance Standards Review Application for the
Garrison Energy Center (Calpine Project) was discussed at the Planning Commission meeting held
on August 21, 2012 and that, to his knowledge, the project was moving forward. He indicated that
there was an ongoing issue between White Oak Solar Energy and the Calpine Project and, although
there had not been resolution, meetings had been held regularly and he had heard no statements that
related discussions have been negative; therefore, he was hopeful that they were moving toward
conclusion.
As previously reported, Mr. Koenig reminded members that the Calpine Project went before the
Department of Natural Resources and Environmental Control (DNREC) for air permitting. An
objection was filed by White Oak Solar Energy and comments were filed by the Environmental
Protection Agency (EPA). It appeared that Calpine was taking action to obtain the necessary permits
and design approval so that the project could be delivered to the grid in June 2015.
In response to Mr. Blakeman, Mr. Koenig confirmed that PJM had identified a list of improvements.
It was his understanding that meetings were held with PJM and the required improvements had been
negotiated. He stated that discussions were held at those meetings and that a final letter would be
issued in the Fall (October) that would give Calpine details regarding access to the grid.
Responding to Mr. Hutchison with regard to gas lines, Mr. Koenig stated that, to his knowledge,
Eastern Shore Natural Gas was working on alignments with Calpine and that there had been no
negative comments regarding the pipeline being delivered in time.
By consent agenda, Mrs. Williams moved for acceptance of the Utility Committee report,
seconded by Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and
Mrs. Russell absent).
Page 6
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 6
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
AUGUST 27, 2012
The Legislative, Finance, and Administration Committee met on August 27, 2012 with
Chairman Lynn presiding.
Auditor’s Responsibility for Communicating with Audit Committee - Fiscal Year 2012 Audit
Program
Mrs. Peggy Teal, Assistant Finance Director, reviewed a presentation entitled Auditor’s
Responsibility for Communicating with Audit Committee. She reminded members that City Council
decided that the Legislative, Finance, and Administration Committee would also serve as the City’s
Audit Committee.
The Committee recommended acceptance of the presentation, as reviewed by staff.
By consent agenda, Mrs. Williams moved for acceptance of the Committee’s recommendation,
seconded by Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and
Mrs. Russell absent).
Civilian Pension Board Recommendation - Adjustment to the Minimum Payment for Pension
During the Civilian Pension Board Meeting of August 15, 2012, members considered an adjustment
to the minimum payment for pension and recommended approval of Option #1, as outlined in the
information provided by Mr. Les Blakeman in reference to the Discussion - Adjustment to the
Minimum Payment for Pension, increasing the minimum payment for pension to $500 per month,
at the next scheduled City Council meeting, and to order an actuarial study based on $500 per month.
(City Clerk’s Office Note: Recommendations of the Civilian Pension Board are forwarded to the
Legislative, Finance, and Administration Committee for their review and recommendation to be
forwarded to City Council for final action.)
Mr. Les Blakeman, 209 Falmouth Way, addressed members as an elected member of the Civilian
Pension Board and reviewed information related to the discussion regarding an adjustment to the
minimum payment for pension including three (3) proposals, along with historical information.
Responding to Mr. Shevock regarding the effect the recommendation would have on the total
pension fund, Mr. Scott Koenig, City Manager, stated that a request was submitted to the actuary and
read a portion of an email received, as follows: “On the funding aspect, we would recommend that
the entire increase be paid immediately. The funded percentage of the plan is about 40% as of the
last study in total, and was only 60% for retirees alone.” He explained that the actuary indicated
that there were enough assets at present to cover only 60% of the benefits promised to current
retirees and no remaining assets for other members. As a result, he stated that the actuary
recommended that if the City wished to approve the proposal, it should be paid all at once, since the
plan was underfunded at this time. While the calculated cost was $64,000, Mr. Koenig was unsure
of the amount that this would translate to for the actuary.
Page 7
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 7
In response to Mr. Shevock regarding the amount of Social Security benefits paid to pensioners,
Mr. Blakeman indicated that it was not possible to obtain specific information; however, he
suggested that it could be assumed that these individuals were not receiving very much in the way
of Social Security based on the fact that they were not receiving much of a pension.
Responding to Mr. Shevock, Mr. Koenig stated that the source of funds required to pay for the
proposed increase would have to be determined by City Council and debated by the Committee. He
stated that the Treasurer/Controller had suggested that the increase should be paid by adjusting the
pension contributions of current employees.
At the request of Mr. Lynn, Mr. Koenig stated that a copy of the email received from
Mr. Scott Porter, the actuary, would be provided for inclusion in the record. It was his understanding
that the actuary would provide the cost to conduct a study to accommodate the recommendation and
that no costs had been incurred to date as a result of the Civilian Pension Board’s recommendation.
Mr. Anderson suggested that some pensioners have income from sources other than Social Security
and questioned the demographics of the pensioners. Responding, Mr. Blakeman stated his feeling
that such information would be impossible to determine.
In response to Mr. Bonar, Mr. Koenig stated that current employees of the General Pension Plan pay
3.5% of their salary into the Plan and employees of the Police Pension Plan pay 7% of their salary
into the Police Pension Plan. Noting that the City’s Pension Plans are one of its biggest liabilities,
Mr. Bonar felt that the time had come for the City to request employees to contribute a larger share
to their pension. He suggested that the civilian employees also be required to contribute 7% of their
salary to the General Pension Plan. He indicated the importance of the City developing a means of
getting the Pension Plans under control, and expressed his feeling that the City could only ask so
much of their citizens and that employees should have a role in this regard.
Responding to Mr. Perza, Mr. Koenig stated that staff had no objections to requesting an actuarial
study to determine costs and that his personal preference would be to request the members of the
General Pension Plan to vote in favor of paying for any increase. He explained the delicacy of this
matter as an employer. Staff recommended that the actuarial study be performed to be presented to
the Committee for their review and consideration of how an increase would be funded.
Council President Leary noted that the Pension Plan and its benefits were codified many years ago
and that the life expectancy of its members had increased since that time, which created a problem
with the unfunded pension liability. He felt that any action taken by the City affecting taxpayers
would only increase this liability.
In response to Mr. Anderson, Mrs. Peggy Teal, Assistant Finance Director, indicated that the City
Manager had already requested details regarding all pensioners, such as years of service (10, 20, 25,
etc.). She indicated that although staff had begun to work on this information, it was not yet
complete. She stated that the cost of an actuarial study should be minimal since the actuary already
had specific records. Since he was scheduled to conduct an update on the unfunded and funded
liabilities this year, he would be “piggy backing” the requested actuarial study.
Page 8
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 8
Referring to the 60% unfunded liability, Mr. Hutchison questioned if the City would be required to
increase its funding each year to reduce this liability under new regulations. Responding, Mrs. Teal
stated that the American Institute of Certified Public Accountants (AICPA) recently released new
information that was currently being reviewed by staff to determine what, if any, impact it would
have on the City. Council President Leary indicated that staff had suggested the possibility of a
workshop being held with members of City Council to review the extensive new regulations.
In response to Mr. Bonar, Mrs. Teal stated that the 60% unfunded pension liability equated to
approximately $40M.
Mr. Koenig reiterated the awkwardness of staff’s position in this matter with former employees,
noting that they served the City well and that the City would like to take care of them during their
retirement years. However, he felt it important that members understood that the information
provided did not distinguish between those employees who served 10, 20, or 25 years. He also noted
that some employees who worked 10 years, became vested, and then left the City’s employment were
not on the list, since they had not reached 65 years of age; therefore, the list of retirees was not
comprehensive. He explained the importance of obtaining all information prior to making any final
decision in this matter. Referring to the Pension Board’s recommendation, he requested that the
Committee authorize an actuarial study of all three (3) options originally presented to the Board by
Mr. Blakeman, or at least obtain the cost to conduct all three (3) options rather than just one (1).
Mr. Koenig stated that if it was Council’s desire to consider providing an increase in the minimum
payment for pensioners, that members should consider the possibility of requesting pension members
to pay for the costs involved so that there would be no effect on the City’s budget. He reminded
members that the General Pension Plan is a closed plan and that there were employees in the Defined
Contribution Pension Plan (401(a) Plan) who were not receiving such consideration. Mr. Koenig
stated the need to conduct an actuarial study to determine if the City could afford to fund the
proposed increase and what would be the best method with the least impact on the public.
Mr. Shevock moved to recommend that the matter be tabled to allow staff to determine how an
adjustment would be funded, seconded by Mr. Rushe.
Mr. Lynn reminded members that Council’s authorization would be required for an actuarial study;
therefore, if the study were not authorized, staff would not be able to obtain the necessary
information to determine the costs of such an adjustment or how the adjustment would be funded.
The Committee recommended retaining the actuary to determine the cost of providing a minimum
payment of $300, $400, and $500 to all retirees or their surviving spouses, and that staff determine
how an adjustment would be funded.
By consent agenda, Mrs. Williams moved for approval of the Committee's recommendation,
seconded by Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and
Mrs. Russell absent).
Page 9
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 9
Salary and Benefits Compensation Comparison Committee Report
Members were provided a Salary and Benefits Compensation Comparison Committee Summary
Report - June 2012. As Chairman of the Salary and Benefits Compensation Comparison Committee,
Mr. Perza reminded members that City Council established the Committee, consisting of citizens,
to compare City of Dover municipal employee salary and benefit packages to the salaries and
employee benefits provided by the State of Delaware and other local governments. He explained
that the municipalities under review were limited to Delaware, and subgroups within the Committee
were provided flexibility to seek out those municipalities most comparable to their assigned
employee classifications. He stated that it was the Committee’s general observation that the
combined salary and benefit compensation packages paid to City of Dover employees compared
favorably to other municipalities in Delaware.
Mr. Lynn reminded members that he had argued against the formation of the Salary and Benefits
Compensation Comparison Committee from its inception. With no disrespect, he stated his belief
that it was flawed not only in its application, but in its poor mandate. Mr. Lynn noted that, as stated
by Mr. Perza, the Committee determined that there was no municipality comparable to the City of
Dover in the State of Delaware, with the possible exception of the City of Newark; therefore, the
mandate given to the Committee by City Council was flawed from its inception. Rather than looking
at municipalities which fall within the City’s Consumer Price Index (CPI) region, the Committee
focused on comparing municipalities within the State of Delaware, none of which are comparable
to Dover. In addition, he stated that it was flawed in its application because the Committee solely
considered job titles rather than job responsibilities or qualifications. In addition, Mr. Lynn noted
that old and/or outdated data (older than two (2) years) was utilized by the Committee to reach its
conclusions; therefore, any information provided to members by the Committee (through no fault
of their own) was not reliable and should not be given any weight. As a result, Mr. Lynn suggested
the rejection of the report.
Mr. Anderson moved to recommend acceptance of the report and thanked the Committee for their
work, recognizing there were limitations and, if taken into account, he felt that the information
provided was extraordinarily useful. The motion failed due to the lack of a second.
Responding to comments of Mr. Lynn, Mr. Perza stated that the concerns regarding the
comparability of Dover to other municipalities in Delaware was addressed by members of the
Committee to the best of their ability by removing cities that did not apply, such as those that did not
have an electric department. Members discussed the CPI early in the process and this was rejected
since members were not concerned with employees leaving the City of Dover to go to municipalities
outside of the State of Delaware (such as Annapolis or New Jersey). The Committee’s concern was
with employees leaving for employment with another municipality within the State of Delaware.
Mr. Perza stated that several members actually spoke directly with employees of other municipalities
about job titles and felt that it was an overly broad statement to indicate that the research consisted
only of a job title comparison.
Responding to Mr. Lynn, Mr. Perza confirmed that there was difficulty in assessing non-bargaining
employees, since there was a wide array of duties and responsibilities of the positions.
Page 10
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 10
Mr. Bonar suggested that members accept the report and if desired, members of Council could
request the Committee to consider some of the suggestions made by Mr. Lynn and request the
Committee to conduct another salary and benefits comparison of other cities of similar size in the
region.
The Committee recommended acceptance of the Salary and Benefits Compensation Comparison
Committee Report as presented.
By consent agenda, Mrs. Williams moved for approval of the Committee's recommendation,
seconded by Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and
Mrs. Russell absent).
By consent agenda, Mrs. Williams moved for acceptance of the Legislative, Finance, and
Administration Committee Report, seconded by Mr. Bonar and carried by a unanimous roll
call vote (Mr. Anderson and Mrs. Russell absent).
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE REPORT -
AUGUST 29, 2012
The Safety Advisory and Transportation Committee met on August 29, 2012 with
Chairman Hutchison presiding.
Proposed Ordinance #2012-05 Amending Chapter 46 - Fire Prevention and Protection
Mr. Dave Truax, Fire Marshal, advised members that Proposed Ordinance #2012-05 would amend
Chapter 46 - Fire Prevention and Protection and Appendix F - Fees and Fines to clarify existing
language and create new subsections which would make it unlawful for any person to tamper with
or impair any fire protection system from operating as designed; specify the authority of the Fire
Marshal; prohibit open burning, commercial barbecuing, and unattended outdoor fireplaces at any
time and authorize the Fire Marshal, code official, fire officer, or police to order the open burning
extinguished; and remove the requirement for fire alarm installation reports. It would also create
new sections to address fire hydrants and Fire Department connections; reporting of fires and
spreading of alarms; unlawful regulations or orders; maintaining records for inspections; and
marking rated walls. Mr. Truax explained that staff met with representatives of the Kent County
Association of Realtors and the Central Delaware Chamber of Commerce to receive input on the
proposed ordinance.
Staff recommended that the Committee forward Proposed Ordinance #2012-05 to City Council with
a recommendation for adoption.
In response to Mr. Davis regarding Lines 250 - 252 of the proposed ordinance, Mr. Truax explained
that in some cases building managers have issued verbal advisories or posted written orders that
instruct residents to delay notification of the Fire Department when an alarm sounds, stating that the
establishment’s staff would make sure there was a fire and then notify the Fire Department.
Mr. Truax stated that such orders would defeat the purpose of a fire alarm. He also noted that
repeated soundings of a fire alarm can alert the Fire Marshal’s Office that an alarm system is not
being maintained properly.
Page 11
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 11
Responding to Mr. Hutchison in regard to community education about the ordinance, Mr. Truax
stated that the ordinance would be posted to the City’s website and that the press often publicizes
such ordinances. He explained that typically when new provisions are implemented, such as the
requirement to keep a log of all fire inspections, staff would not issue a summons or fine for
violations during the first year but would use these opportunities to educate those affected regarding
the new provisions.
Mr. Hutchison suggested that a summary of the changes be prepared and distributed to larger
apartment complexes and day care centers in the City. Mr. Truax stated that the information would
be posted on the City’s website and that staff would do whatever must be done to get the information
out to the public.
The Committee recommended adoption of Proposed Ordinance #2012-05 Amending Chapter 46 -
Fire Prevention and Protection, as recommended by staff.
By consent agenda, Mrs. Williams moved for approval of the Committee's recommendation,
seconded by Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and
Mrs. Russell absent). (The First Reading of proposed Ordinance #2012-05 will take place during
the latter part of the meeting.)
Prioritization of City of Dover State Capital Transportation Program (CTP) Projects
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that the City develops a list of transportation project priorities and submits them in the form of a
letter to the Secretary of Transportation annually. She noted that she and Mr. Scott Koenig, City
Manager, reviewed the priorities submitted last year and, in light of more recent discussions and
issues, reordered them and included additional projects. Mrs. Townshend reviewed the 2012
Transportation Prioritization List, noting that Project #1, the West Dover Connector, was on track
and moving forward. She indicated that Project #2, Sidewalks on Route 8 in the Vicinity of the New
Dover High School, had been added to the list for 2012 and that this project should be given very
high priority. She stated that she has been very outspoken about concerns regarding the need for
signalization and pedestrian access during regular coordination meetings held in connection with the
construction of the school. Mrs. Townshend noted that the Route 8/Hazlettville Road Connector
project had been placed as Priority #3 and that the Delaware Department of Transportation
(DelDOT) had postponed this project, with design now planned to begin in 2017. She expressed
concern that traffic problems would occur if this project was not moved forward, since the new high
school was scheduled to open in 2014. Mrs. Townshend stated that the Garrison Oak Connector
Road was listed as Project #4 and Project #11, Kings Highway/Route 13 Intersection Improvements,
was added to the 2012 list. She explained that the cost of transportation improvements needed at
the intersection had hindered potential development projects, in particular at the former Playtex site
at the southwest side of the intersection. She indicated that this intersection had been assigned a
DelDOT Level of Service (LOS) grade of F, which would require improvements for large or small
projects at that location. Mrs. Townshend stated that discussions had been held with DelDOT
regarding the adoption of a resolution by City Council that would establish the intersection as a study
area for transportation planning. She anticipated that the City would be working with DelDOT to
bring forward what the County terms a “Transportation Improvement District” (TID), whereby a
Page 12
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 12
defined area would be studied and developers would pay into a fund for associated improvements,
rather than bearing the entire cost of improvements. She noted that staff felt it important to get this
project on the “radar screen.”
Mr. James Galvin, Principal Planner, Dover/Kent County Metropolitan Planning Organization
(MPO), noted that DelDOT was in the process of creating its own TID model and it was anticipated
that this would be available by the end of 2012. He stated that the State would begin by working
with TIDs developed by the County.
In response to Mr. Hutchison regarding the number of failing intersections (are rated LOS F on the
DelDOT grading system) in the City that connect with Route 13, Mr. Koenig advised members that
some intersections fail only during rush hour and others fail throughout the day. He stated that the
Kings Highway/Route 13 intersection fails “a couple of times per day.” Mr. Koenig explained that
there are a number of small properties at that location (Dunkin Donuts, Capital Cleaners, and Rita’s
Water Ice) and that expansion of the intersection (except at the Rite Aid property) would involve not
only acquiring the right-of-way but buying and relocating the businesses. Mr. Koenig stated that it
would not be possible to upgrade many of the Route 13 intersections to LOS A, B, or C because of
area restrictions and the fact that large intersections are not desirable there (if not needed) because
they create difficulty in crossing the highway. He felt that some intersections that were identified
as either failing or almost failing would necessarily be present as part of the transportation system
and that a balance must be found between the function and the level of service required. It was his
recollection that the City had determined to accept a LOS D for intersections in the Comprehensive
Plan.
Mrs. Townshend concurred; however, she noted that this intersection was rated below LOS D.
Mr. Koenig noted that additional information was needed to determine if only certain aspects of the
intersection were failing, such as the turning angles.
Mr. Hutchison noted the importance of economic development at the intersection of Kings Highway
and Route 13 and felt that options should be explored.
Mrs. Townshend stated that the other projects included on the 2012 Transportation Prioritization List
had been in the queue for a number of years and noted that there were more projects than funds
available; however, she felt it important that they remain “on the radar screen.”
Responding to Mr. Davis, Mrs. Townshend stated that improvements could be made to the
Kings Highway/Route 13 intersection prior to knowing the exact type of development that would
occur because some assumptions could be made regarding the type of development expected based
on the zoning and the market, and work could begin within those parameters. She noted that since
the intersection was constrained, the area could be improved only to a certain point. Priorities would
include making the intersection run straight across Route 13 and providing two (2) turn lanes to
allow a smoother flow of traffic. She noted that the City could also consider improving
Maple Parkway, which is a City street; however, she felt that most businesses at that location would
want direct access to Kings Highway and Route 13.
Page 13
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 13
The Committee recommended approval of the 2012 Transportation Prioritization List, as
recommended by staff.
By consent agenda, Mrs. Williams moved for approval of the Committee's recommendation,
seconded by Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and
Mrs. Russell absent).
Update - Dover High School Construction
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that she recently attended a Dover High School construction coordination meeting and that the
remaining concerns related primarily to signalization and pedestrian access at the school. She
reminded members that on June 27, 2012 the Committee recommended that City Council send a
letter to the Delaware Department of Transportation (DelDOT) regarding these issues and that this
letter was sent on July 9, 2012. She stated that the Secretary of Transportation responded on
August 7, 2012, stating that DelDOT could not support the signalization and the sidewalk was not
in their capital program; however, a cost estimate could be developed. Mrs. Townshend provided
members with correspondence from Natalie Barnhart, Chief Engineer, Delaware Department of
Transportation (DelDOT) dated August 29, 2012 which included a cost estimate of $600,500.
Mrs. Townshend stated that staff would work with the Dover/Kent County Metropolitan Planning
Organization (MPO) to prepare a Transportation Improvement Program (TIP) amendment,
explaining that the project must be included in the MPO TIP before it can be submitted to the State
Capital Transportation Plan (CTP). She felt that the City should work concurrently with legislators,
possibly through the Transportation Enhancement Program, to see if the project could be addressed
outside the CTP process, which would likely take at least two (2) years to obtain funding.
Mr. James Galvin, Principal Planner, Dover/Kent County MPO, stated that the Transportation
Enhancement Program (TEP) has been discontinued under new federal highway legislation and that
projects that previously competed only with other TEP submissions would now compete with all
road projects.
Mrs. Townshend stated that the City would continue to bring this issue up and that other sources of
funding could be explored, such as the Nemours Foundation.
Mr. Hutchison stated that student safety should be given the highest priority and that this should be
emphasized with DelDOT.
Mrs. Townshend stated that if safe pedestrian access were not provided, more parents would be
driving their children, requiring more cars on the road. She understood that traffic engineering
models dictate how things work; however, she felt that the City must stay on the record stating this
must be done correctly because this project differs from other projects in that it is a school and is
built around the needs of children.
In response to Mr. Hutchison, Mrs. Townshend was unsure how many children would be walking
to school; however, noted bus transportation would not be provided for students residing within
two (2) miles of the school.
Page 14
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 14
In response to Mr. John Gaines, Project Manager, Delaware Department of Transportation
(DelDOT), Mrs. Townshend stated that high schools were ineligible for DelDOT’s Safe Routes to
School Program.
Mr. Davis noted that a Certificate of Occupancy would be denied to a restaurant with unsafe
conditions and inquired if this were a possible course of action for the new high school.
Responding to Mr. Davis regarding the position of the Capital School District, Mr. Koenig stated
that the District had a study performed which indicated that a light was not needed immediately at
the east entrance of the school, and the DelDOT engineer who reviewed the project specified the
amount of sidewalk that was required and the District had complied. The sidewalk being discussed
was beyond the limits of the District’s property and was, therefore, an offsite improvement. He
indicated that members of the Capital School District have maintained that the new school is a
community facility and if the infrastructure around the facility must be expanded to accommodate
it, this was not their financial responsibility. Mr. Koenig stated that District members did not
consider the District to be a developer and they felt that the District’s community mission was to
build a school and support the function of the school, not the transportation network.
Mr. Hutchison expressed his opinion that the City’s function was to review and make
recommendations to DelDOT, who is ultimately responsible. He noted that the City’s primary
concern was the safety of the students in the school and the traffic pattern.
Mr. Lynn stated his belief that, in Delaware, developers are responsible for the causative effects of
projects on the surrounding community. He noted that several heavily litigated ordinances had been
set forth by Kent County Levy Court and it was determined that developers are responsible for the
effect they have on their surrounding community. He felt that the Capital School District was a
developer and had a responsibility to the area infrastructure.
Responding to Mr. Lynn regarding the measures that the City could take to pursue this issue,
Mrs. Townshend indicated that the City should begin to appeal to the Capital School Board,
maintaining that they are a developer, they have a responsibility in this matter, and these are their
students that the City is attempting to get safely to their facility. She felt that the City should work
with the School District to “get them vocal” on the issue and to determine if they have funds that
could be brought to the table. Mrs. Townshend indicated that the five (5) years that may be required
to get the project through the CTP process would be too late. She felt that the District was willing
to put the signal in, so the City could not hold them responsible because DelDOT would not allow
signalization. Regarding the sidewalk, she suggested that the School District may be able to assist
in obtaining funding from legislators.
In response to Mr. Lynn, Mrs. Townshend stated that the project plans submitted did not indicate the
light; however, all discussions included two (2) signalized intersections. Staff realized early in the
project that because of the location and the scale of the project, this would be one of the most
important projects that they would deal with, and the Planning Commission and the Capital School
Board held a joint meeting before the application was submitted and specifically discussed
Page 15
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 15
signalization at that time. While staff was aware that the warrants were required, staff received the
sense that this was almost a formality and was given no impression from DelDOT that there was a
low likelihood that the signal would be approved.
Mr. Lynn inquired if the City could require DelDOT to install the light or shut the project down.
Mr. Koenig stated that the City would not want to withhold inspections because a massive lawsuit
for damages would likely be received from the individual contractors associated with the project;
however, the City did have authority to withhold a Certificate of Occupancy. In addition, he noted
that there are unusual occurrences of traffic lights within the City, for example, at Gibbs Drive and
Route 8,which has little sidestreet traffic. He questioned why this light met the warrants but the area
in question did not. He felt that the City should advise the Capital School District about the
possibility of not being able to open because of this concern.
Mr. Hutchison suggested reaching out to the President of the Capital School District Board of
Education and the District Superintendent to ask them to attend next month’s meeting to determine
their position on this issue.
Mr. Koenig noted that the new Dover High School was a huge project that would instantaneously
change that area of the City on the day that it opens.
Mr. Hutchison requested that staff obtain information from the School District regarding the number
of students expected to be walking to the new high school.
Mr. Hutchison requested and members agreed that the President of the Capital School District Board
of Education and the District Superintendent be asked to attend the next meeting to discuss
signalization and sidewalks on Route 8 in the vicinity of the new Dover High School.
Briefing on Delaware Department of Transportation (DelDOT) Projects
Mr. John Gaines, Delaware Department of Transportation (DelDOT), provided members a briefing
on DelDOT Projects, as follows:
DelDOT Repaving Project
The Delaware Department of Transportation (DelDOT) Repaving Project encompasses seven (7)
locations. The first two (2) projects, College Road and Walker Road, are complete. The method of
construction involves three (3) steps, including: 1) concrete work (such as islands, sidewalks,
American Disabilities Act (ADA) curbs, and curb ramps); 2) any necessary intersection
improvements; and 3) milling, paving, and striping. The first two (2) steps of the Forrest Avenue
and Governors Avenue projects are complete, so milling of Forrest Avenue will start the first week
of September (depending on weather), followed by paving during the second week, and milling on
Governors Avenue will begin during the second week of September, followed by paving. He stated
that, ideally, Forrest Avenue and Governors Avenue should be complete in September and DelDOT
would then move forward with the remaining three (3) projects.
Page 16
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 16
West Dover Connector
Semi-final right-of-way and construction plans for the West Dover Connector were submitted two
(2) weeks ago, which Mr. Gaines stated was a major milestone. The next major milestone would
be finalization of the right-of-way plans, which was scheduled for November. Once the final
right-of-way is complete, he estimated that it would take DelDOT’s real estate acquisition section
approximately two (2) years to acquire properties on Charles Polk Road to clear the right-of-way.
He advised members that appraisals had already been performed on these properties. Mr. Gaines
stated that the project was funded for construction in FY 2015-2017 and indicated that there would
be no additional update information before the semi-final and final right-of-way phases were
concluded.
Route 8/Hazlettville Road Connector
Mr. Gaines stated that the Route 8/Hazlettville Road Connector project was “pushed out” and was
funded for preliminary engineering in 2017. Mr. Gaines stated that this project was included in the
Community Transportation Plan; however, due to a breakdown in the procedure, the environmental
process was never conducted. He stated that the major landowner who would be affected by the
project was not in favor of it, and without an environmental document to support acquisitions, the
project could not be approved. He stated his belief that this project may have been postponed in
order to work on this step of the process.
Responding to Mr. Hutchison, Mr. Gaines stated that he did not expect to attend future Committee
meetings on a regular basis but was asked by DelDOT to provide an update since he was
knowledgeable about the projects being discussed.
Briefing on Dover/Kent County Metropolitan Planning Organization (MPO)
Mr. James Galvin, Principal Planner, Dover/Kent County Metropolitan Planning Organization
(MPO), stated that the Dover Pedestrian Bike Path planned for the downtown area was originally
planned to extend along the St. Jones down to Public Safety Boulevard using funding identified by
the Governor for bicycle routes. He indicated that the portion of the project behind Legislative Hall
from the St. Jones, down Court Street to Route 13, and along Route 13 to the traffic light at the
intersection of Public Safety Boulevard had been funded. This section was currently in the design
phase, which should be complete by January 2013, and it was hoped that construction would begin
in the Spring of 2013. He indicated that a meeting had been arranged with the City to discuss this
first phase. Mr. Galvin advised members that future phases of the project would include the area
along Park Drive to Legislative Hall and Court Street (behind the Delaware Public Archives) and
a connection from Court Street to the former sewage treatment plant and continuing along the river
as far as possible and ultimately connecting with Pine Street.
In addition, Mr. Galvin advised members that the Dover/Kent County MPO was in the process of
amending the Transportation Improvement Program (TIP), and one (1) of the items included was
approval of additional funding for extending Clarence Street from North Street to Forest Street. He
reviewed a plan for the project that was developed by Century Engineering, approved by DelDOT,
and was presented through public workshops. An additional $1.4M was being sought which would
cover final design into the right-of-way phase, although it would not allow for acquiring all of the
necessary right-of-way or for construction of the project. He noted that the route runs through a tar
Page 17
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 17
ditch, goes around an industrial warehouse and buildings that are accessible from Lincoln Street, and
runs through two (2) houses on Forest Street, and the net real affect would be on these two (2)
houses. Mr. Galvin stated that additional funding was being sought in the TIP to pay for the project
to move forward within the next year.
By consent agenda, Mrs. Williams moved for acceptance of the Safety Advisory and
Transportation Committee Report, seconded by Mr. Bonar and carried by a unanimous roll
call vote (Mr. Anderson and Mrs. Russell absent).
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
SEPTEMBER 10, 2012
The Legislative, Finance, and Administration Committee met on September 10, 2012 with
Chairman Lynn presiding. It was noted that, except for the following time sensitive issue, the
Legislative, Finance, and Administration Committee Report of September 10, 2012 would be
presented to Council during their Regular Meeting of September 24, 2012 for review and
consideration.
Purchase of Police Department Parking Enforcement System
Police Chief James Hosfelt presented a request for approval of the sole vendor purchase of a new
parking enforcement system for the Police Department from Cardinal Tracking, Inc., to be funded
by the US Department of Justice, Office of Justice Programs, Justice Assistance Grant (JAG)
Program, in the amount of $47,125.00, and State Aid to Local Law Enforcement (SALLE) Grant
funds, in the amount of $2,875.00.
Chief Hosfelt explained that the system currently in use was obsolete and could not be updated to
include the features needed to implement the recent changes incorporated by the City. He noted that,
currently, data cannot be queried to allow retrieval of necessary information to support scofflaw
(repeat/habitual offenders) reporting, which is vital to implementing the City's new Vehicle
Immobilization law. The limitations of the current system do not permit the effective collection of
unpaid debts. The new system allows for customized queries, which would enable the Department
to retrieve data in almost any form; however, the old system does not have this capability. The new
parking enforcement system would also update both the hardware and software components and
eliminate the need to employ an outside collections agency. The new handheld computer units
feature integrated cameras, eliminating the need for enforcement personnel to carry digital cameras,
and the images would automatically flow with the violation data. A point-of-sale component in the
Records Unit would allow for the immediate posting of payments to accounts. The cost also
includes the conversion of current data, as well as on-site system set-up, installation and training.
Chief Hosfelt stated that Cardinal Tracking, Inc. would host the system; therefore, the City would
not be required to purchase a server.
In response to Mr. Shevock, Chief Hosfelt stated that, unfortunately, the existing equipment could
not be retrofitted to the new system. He stated that the current system would remain in use until all
existing fines were paid and the new system would be used in parallel until that time.
Page 18
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 18
In response to Mr. Hare, Chief Hosfelt confirmed that the existing equipment would not be discarded
but kept as backup.
Mr. Lynn noted that, due to time constraints, staff requested that this matter be considered during
the Council Meeting later in the evening.
Staff recommended approval of the sole vendor purchase of a new parking enforcement system for
the Police Department from Cardinal Tracking, Inc.
Mr. Hare moved to recommend approval of staff’s recommendation, seconded by Mr. Rushe
and unanimously carried.
Responding to Mr. Bonar, Police Chief James Hosfelt stated that the US Department of Justice,
Office of Justice Programs, and Justice Assistance Grant (JAG) Program funding in the amount of
$47,125 had been approved and was made available for technology upgrades.
Responding to Mr. Perza, Chief Hosfelt stated that there were no ongoing maintenance or licensing
fees for the system software.
Mrs. Williams moved for approval of the Committee’s recommendation, seconded by
Mr. Bonar and carried by a unanimous roll call vote (Mr. Anderson and Mrs. Russell absent).
Mr. Hare moved for acceptance of the Legislative, Finance, and Administration Committee
Report, seconded by Mr. Lynn and unanimously carried.
MONTHLY REPORTS - JULY 2012
By motion of Mrs. Williams, seconded by Mr. Bonar, the following monthly reports were
accepted by consent agenda:
Chief of Police Dover Fire Department
City Assessor Economic Development
City Manager
Referring to demolition permits in the City Planner Report, Mr. Leary requested
Mrs. Ann Marie Townshend, Director of Planning and Community Development, to provide a status
report on the three (3) Wesley College properties located in the 100 block of North Governors
Avenue that were being prepared for demolition. Mrs. Townshend advised members that the
properties had a fence around them, the asbestos abatement had been done and the paperwork had
been turned in, and demolition permits were issued three (3) weeks ago. She stated that she had been
in contact with the contractor and Dr. William Johnston, President of Wesley College. Dr. Johnston
had advised her that they were working to demolish the buildings as soon as possible. The Director
of Security for the college was conducting regular patrols of the houses to be sure they were secured
and the maintenance staff would inspect the fencing to ensure that any necessary repairs are made
to keep it secure. Dr. Johnston anticipated that the buildings would be demolished soon, although
equipment was to have arrived last week and it did not.
Page 19
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 19
Mr. Hare stated that the demolition services were being donated and a little leeway should be given
in this matter. He indicated that delays were caused by the asbestos abatement and removal of oil
tanks.
Responding to Mrs. Williams, Mrs. Townshend stated that the relocation of staff from White Oak
Park to Schutte Park would not disrupt any activities. She noted that the classroom space at the Pitts
Center was being converted to staff offices and a number of programs would be relocated to the new
library in October.
Mr. Bonar moved for acceptance of the City Planner Report, seconded by Mr. Hare and
unanimously carried.
RECONSIDERATION OF EVALUATION OF PROPOSALS - ELECTRIC UTILITY
VALUATION SERVICES
Council President Leary advised members that this item was considered during the Council meeting
of August 27, 2012. A motion to award the contract failed to obtain the affirmative vote of a
majority of the members elected to the Council, as required by Article II, Section 10, of the City’s
Charter. Councilman Anderson moved for reconsideration and to have this entered on the minutes
for the next Council Meeting for consideration when the full Council was present.
Mr. Scott Koenig, City Manager, advised members that in October 2011, City Council authorized
staff to oversee the preparation of a Request for Proposals (RFP) for a Cost of Service Study to
determine the valuation of the entire City of Dover Electric System. Due to the technical and legal
complexity of the RFP process for this type of request, staff utilized the services of Mr. Kirk Betts,
the City’s power supply attorney, to develop and prepare the RFP, as well as to review submissions
from the consultants who expressed interest in the project.
Mr. Koenig indicated that on June 18, 2012, the City of Dover issued an RFP seeking proposals from
qualified independent consultants to provide an opinion and study regarding the value of the
City’s electric utility system and four (4) proposals were received in response. He explained that
the proposal evaluation process included two (2) components: the technical component process,
which included compliance with the form and content requirements of the RFP, expertise and
experience, valuation approach, comprehensiveness of the work plan and adequacy of analytical
procedures; and the second component, which was related to pricing evaluation. Mr. Koenig stated
that Betts & Holt, LLP, ranked the proposals as follows: 1) GAI Team; 2) Burns; 3) AERCA Team;
and 4) MRV.
Based upon the ranking and the recommendation of Betts & Holt, LLP, staff recommended that the
City of Dover award the contract for Electric Utility System Valuation Services to GAI Consultants
in the amount of $117,500.
Responding to Mrs. Williams, Mr. Koenig stated that, according to the scope of work, the study must
consider the following factors: 1) net book value of the Electric System's generation, transmission,
and distribution assets and infrastructure; 2) replacement cost new depreciated value (RCND) of the
Electric System; 3) valuation of the Electric System (revenue analysis) as an ongoing enterprise to
Page 20
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 20
determine range of values over book value; 4) net proceeds that Dover would realize from a sale of
the Electric System after subtracting funds for refunding of outstanding debt and other expenses;
5) comparison of the Electric System's rates with the rates of other retail electric utilities serving
customers in Delaware; 6) analysis of the replacement cost of electricity for municipal facilities;
7) possible tax revenues (i.e., property taxes and franchise fees) that may be realized by the sale of
the Electric System; 8) impact of loss of Electric System revenue on Dover's General Fund;
9) impact of long-term solar energy power supply contract and forward energy positions on
valuation; 10) Dover staffing and payroll changes that are likely to result if the Electric System is
no longer a Dover responsibility; and 11) other potential values lost or gained, such as economic
development, if the Electric System is sold. Mr. Koenig stated that if the City moves forward with
the study, there would be something of value in the study for everyone, whether it be from a business
operations standpoint or a sales standpoint.
Responding to Mrs. Williams, Mr. Koenig stated that the study would include debt released, the
impact, and the valuation of any potential power agreement related to Calpine.
Mr. Bonar stated that there was no offer on the table for the sale of the electric department. He felt
that the study would provide the tools to thoroughly assess, study, and determine the exact worth of
the operation in addition to providing a means to operate more efficiently.
Mr. Lynn stated that he was adamantly opposed to the sale of the electric utility. He noted that
although the scope of the study was broader than selling the utility, it was predicated upon selling
the electric utility. Mr. Lynn stated that the utility was the backbone of the City’s economic
infrastructure, selling it would be foolish, and spending $100,000 in these economic times to satisfy
the curiosity of certain Council members was not worth it.
Mr. Perza stated that he was very hesitant about selling the asset; however, he was concerned about
the maintenance cost to keep the asset. He did not want the City to “go under” because of a decision
that they have made. Mr. Perza believed that the information that could be learned from the study
would be valuable for the purposes of making the system more efficient and determining how best
to use the assets, which would benefit the City.
Mr. Hare noted that he previously proposed the possible sale of the electric utility for a good price.
He felt that the study could answer the question of why it should not be sold.
Mr. Hutchison stated that the electric utility was the City’s greatest asset. He felt that this would be
one of the most important studies that could be conducted to answer questions regarding the utility.
Mr. Lynn stated that he did not know what would be done with the money generated from the sale
of the utility, nor how those funds could be insulated from spending by future Councils. He stated
that because the Electric Fund was used to subsidize the General Fund on an annual basis, the
absence of those funds would be catastrophic to the economic health of the City.
Mr. Bonar stated that the study would provide information and tools to determine how the system
was being operated and its true value.
Page 21
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 21
Mrs. Williams moved for approval of staff’s recommendation to award the contract for electric
utility valuation services to GAI Consultants in the amount of $117,500 based on the
recommendation provided by Betts & Holt, LLP, seconded by Mr. Bonar and carried by a roll
call vote of six (6) yes (Perza, Bonar, Williams, Hare, Hutchison, and Leary) and one (1) no
(Lynn) (Anderson and Russell absent).
ANNEXATION/REZONING REQUEST - 110 AND 136 RUSTIC LANE, OWNED BY
TAILILOU, LLC - FIRST READING OF PROPOSED ORDINANCE #2012-21
A request was received for annexation and rezoning of properties located at 110 and
136 Rustic Lane, owned by Taililou, LLC. 110 Rustic Lane (ED00-057.02-02-38.00-000) consists of
1.118+/- acres and is currently zoned BG - General Business (Kent County). 136 Rustic Lane (ED00-
057.02-02-40.00-000) consists of 0.56986+/- acres and is currently zoned RMH - Residential
Manufactured Home District (Kent County). The proposed zoning classification for both parcels
is C-2A - Limited Central Commercial (City of Dover). Staff recommended that the request be
referred to the Utility Committee on September 24, 2012, the Planning Commission on
October 15, 2012, and that a Public Hearing be set for November 26, 2012 at 7:30 p.m.
Mr. Hare moved for approval of staff's recommendation, seconded by Mr. Hutchison and
unanimously carried.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of the
Zoning Ordinance Amendment as read by the City Clerk, by title only, as follows:
ORDINANCE #2012-21 AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 110 AND 136 RUSTIC LANE.
FIRST READING - PROPOSED ORDINANCE #2012-05 AMENDING CHAPTER 46 - FIRE
PREVENTION AND PROTECTION AND APPENDIX F - FEES AND FINES
Council President Leary reminded the public that copies of the proposed ordinance were available
at the entrance of the Council Chambers or could be obtained from the City Clerk's Office and that
final action by Council on the proposed ordinance would take place during the Council Meeting of
September 24, 2012.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that proposed Ordinance #2012-05 was reviewed with representatives of the Chamber of Commerce
and the real estate community and there were no issues on their part. She noted that the ordinance
would clarify existing language and create new subsections which would make it unlawful for any
person to tamper with or impair any fire protection system from operating as designed; specify the
authority of the fire marshal; prohibit open burning, commercial barbecuing, and outdoor fireplaces
to be unattended at any time and authorize the fire marshal, code official, fire officer, or police to
order the open burning extinguished; and remove the requirement for fire alarm installation reports.
Page 22
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 22
It would also create new sections to address fire hydrants and fire department connections; the report
of a fire and spreading of alarm; unlawful regulations or orders; maintaining records for inspections;
and marking rated walls.
Mr. Lynn asked if the unattended burning portion of the ordinance would address the issue of
unattended residential meat smokers. Mrs. Townshend stated that open burning, commercial
barbecuing, and outdoor fireplaces were addressed. She noted that the challenge would be
determining what would be considered unattended and the concern was that the Fire Marshal’s
Office and Police Department would be regulating backyard barbecuing on a regular basis.
Responding to Mrs. Williams, Mr. Dave Truax, City of Dover Fire Marshal, stated that if a fire
extinguisher is necessary to extinguish a fire, the incident should be reported to the Fire Department.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of the
Ordinance Amendment as read by the City Clerk, by title only, as follows:
ORDINANCE #2012-05 AMENDING CHAPTER 46 - FIRE PREVENTION AND PROTECTION AND
APPENDIX F - FEES AND FINES
COUNCIL MEMBERS ANNOUNCEMENTS
Mr. Bonar announced that the Delaware Volunteer Firefighters’ Association would be meeting in
Dover and the annual parade would be held on Saturday, September 14, 2012.
Council President Leary announced that the Dover Fire Department would hold its Second Annual
"Getting Hosed" 5K Run and Walk on September 22, 2012 at Buffalo Wild Wings at 9:00 a.m. He
noted that this was a fundraising event and that registration information could be obtained from
www.trisportsevents.com or by calling Mrs. Rebecca Rollison at 302-736-4242.
Mayor Carey reminded everyone that the following day would be September 11th and requested all
to remember those who lost their lives, as well as the men and women who are defending us.
Mr. Bonar announced that, for the first time since 1930, a Dover Fire Department member,
Charles Boyer, would be sworn in as President of the Delaware Volunteer Firefighter’s Association.
By unanimous consent, the meeting adjourned at 8:26 P.M.
TRACI A. McDOWELL
CITY CLERK
Page 23
CITY COUNCIL MEETING OF SEPTEMBER 10, 2012 PAGE 23
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
September 10, 2012 are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM
S:\AGENDAS-MINUTES-PACKETS\Council-Minutes\2012\09-10-2012.wpd
Exhibit
Exhibit #1 - Presentation - Violation of Dangerous Building Ordinance - 126 N. Ann Avenue
Page 24
EXHIBIT #1
Regular Council Meeting of 09/10/2012
Violation of Dangerous
Building Ordinance
126 N Ann Ave
EXHIBIT #1
Planning & Inspections Department
Dover, Delaware
September 10, 2012
Regular Council Meeting of 09/10/2012
Page 25
126 N Ann Ave
Case History
Five code enforcement cases since 2010
– Exterior violations
– Tall grass and weeds
– Abandoned vehicle
– Vacant Building
Registered by the City as a vacant building in May
of 2010
Subject of fire in October of 2010
Condemned by City Staff on May 10, 2011
Source of neighbor complaints
Page 26
Dangerous Building Code –
Chapter 22 Article XI, Sec. 22-381
(4) Fire Damage, etc.
(5) Unfit for Human Habitation.
(9) General welfare.
(10) Code violations.
(12) Unoccupied buildings.
Page 35
Recommended Council Action
Declare this building and all accessory structures on this property
dangerous.
Order the property repaired or demolished by October 10, 2012
by the owner or equity owner at their own risk.
Order the Building Inspector to cause the repair or demolition of
the structures if not completed by the owner within 10 days of
the date established by City Council.
Order the City Manager with the assistance of the City Solicitor to
cause the cost of repairs or demolition to be charged against the
land on which the building exists as a municipal lien or cause such
cost to be added to the tax duplicate as an assessment, or to be
levied as a special tax, or to be recovered in a suit at law against
the owner.