UTILITY COMMITTEE
AGENDA
MARCH 12, 2012 - 5:30 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate
times. When possible, please notify the City Clerk (736-7008 or e-mail at
CityClerk@dover.de.us) should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Request for Amendment to Resolution #2010-07 (Adopted August 9, 2010) - Wesley College
Alley and Street Abandonment
2. Request for Alley Abandonment (Improved) - East Side of North Bradford Street (Additional
Alley in Conjunction with the Wesley College Streetscape Master Plan)
3. Review of Utility Related Capital Investment Plan (CIP) (Electric and Water/Wastewater)
4. Updates
A. National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm
Sewer Systems (MS4) Permit
B. 30-Day Update - Garrison Oak Technical Park Project
5. Adjournment by 5:55 P.M.
/tm
S:\AGENDAS & MINUTES\Committee-Agendas\2012\03-12-2012 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
REQUEST FOR REVISION TO
APPROVED PETITION TO ABANDON PUBLIC STREETS AND ALLEYS
Before the City of Dover Utility Committee
March 12, 2012
Applicants/Owners: Wesley College
Location: See Diagram for Detailed Locations:
Area #1 Alley between North Governors Avenue and
North New Street from Cecil Street to
Fulton Street
Area#2 Portion of alley between North Bradford
Street and North Governors Avenue, north
of Cecil Street
Area #3 North Bradford Street between W. Division
and Fulton Streets (portions only)
Area #4 Fulton Street between North Governors
Avenue and North State Street
Area #5 Cecil Street between North Governors
Avenue and North State (portion only)
Area #6 North Bradford Street between Cecil and
Mary Streets (portions only)
Area #7 Portion of alley between North State Street
and North Bradford Street, south of Fulton
Street and north of W. Division Street
Tax Parcel ID #: No Tax ID – All public right-of-way
Present Use: Public Streets
Proposed Use: Integration into Walkable Campus
Reason for Request: To implement the Wesley College Master Plan’s recommendation
for creating a more pedestrian-oriented campus
File Number: MI-10-06
Page 3
Request for Revision to MI-10-06 – Street & Alley Abandonment Request of Wesley College
Report to Utility Committee from Planning Commission Meeting of 2/12/2012
Page 2
Wesley College has requested a Revision to the conditions of approval for the abandonment of
several improved streets and alleys in the vicinity of Wesley College. A previous request for a
series of street and alley abandonments for Wesley College (Areas #1-7) was considered by the
Planning Commission on April 19, 2010 with City Council action on August 9, 2010 which
approved the abandonment such to a series of conditions. Specifically, City Council adopted the
staff recommendation that the City maintain ownership and maintenance of the streets and alleys
until they are physically altered by construction in accordance with site plan approval from the
Planning Commission. The College is requesting that these streets and alleys be abandoned
immediately so that they can complete the parcel consolidation and other aspects of their site
plan.
The following report includes background on the review of the abandonment request and other
associates activities.
Existing Property:
The subject property consists of public streets and alleys, owned and maintained by the City of
Dover. The portions of right-of-way approved for abandonment are adjacent on both sides to
other properties owned by Wesley College. Fulton and Cecil Streets (Areas # 4 and 5) connect
North State Street with North Governors Avenue and are conduits for through traffic between the
two roads. The two segments of North Bradford Street (Areas 3 and 6) that are requested for
abandonment end at the college. Several alley segments were also approved to be vacated. See
Location listing of Areas #1-7 and the submitted diagram for details on the location of areas.
Previous Action on Request for Abandonment of Streets and Alleys;
Consideration of the Request for Abandonment involving Areas #1-7 in the vicinity of the
Wesley College campus began in the Spring of 2010. For the Request (MI-10-06), the Planning
Staff supported the conceptual request noting that the long-term abandonment of the subject
streets would help to accomplish Wesley College’s vision of a pedestrian-oriented campus.
Planning Staff also recommended that the abandonment be timed such that the City maintains
ownership and maintenance of the subject streets and alleys until the Planning Commission
approves a site plan for Wesley College that involves the areas to be abandoned. Also noted was
that all public electric, water, wastewater, and storm sewer infrastructure must be located within
permanent utility easements in accordance with the recommendations set forth in the Public
Utilities comments from the DAC report dated April 1, 2010.
Following a public hearing before the Planning Commission on April 19, 2010, the Planning
Commission voted to recommend approval of the street and alley abandonment as requested by
Wesley College with a vote of 7-0 (with 2 members absent). Staff notes that the Planning
Commission motion did not reference the conditions recommended by the Planning Staff.
Review of the Request for Abandonment was considered by the Utility Committee of City
Council on May 24, 2010 and June 28, 2010 (with Public Hearing). Resolution #2010-05
adopted by City Council on July 12, 2010 set the public hearing on the abandonment request.
Following a Public Hearing on August 9, 2010, the City Council on August 9, 2010 approved
Resolution #2010-07 that approved the alley and street abandonments for seven (7) areas along
with a series of conditions. See the motion to adopt the Resolution and the attached copy of the
Resolution.
Page 4
Request for Revision to MI-10-06 – Street & Alley Abandonment Request of Wesley College
Report to Utility Committee from Planning Commission Meeting of 2/12/2012
Page 3
The motion for adoption of the proposed Resolution #2010-07, vacating and abandoning the
alleys and streets on the condition that the Wesley College Plan include the replacement of
existing parking and an increase in total parking, that the utility easements remain in effect, that
public access easements for Fulton and Cecil Streets be part of the plan, that the timing of the
street and alley closures be coordinated with the site plan approval, and that the aforementioned
DAC comments generated by this process and those included in the DAC Application Review
Commentary (see Exhibit #9 to the July 12, 2010 Council Minutes) are included as part of the
plan, and that public access easements be provided through the campus along Fulton and Cecil
Streets, was carried by a unanimous roll call vote (Mrs. Russell and Mr. Ruane absent) and
Council adopted Resolution #2010-07, as follows.
The specific conditions of the Resolution included: the City retains a utility easement on the
streets and alleys; public access easements are to be established for Fulton Street and Cecil Street
through the campus; set the timing of the abandonment to coincide with physical construction in
accordance with a site plan approved by the Planning Commission; required the establishment of
permanent utility easements for public electric, water, wastewater, and storm sewer
infrastructure; required that all on-street parking displaced by project must be replaced in-kind
prior to its removal; and compliance with comments from the DAC Report including agency
comments.
Subsequently in the Summer of 2011, a Site Development Master Plan (S-11-13) was filed for
review outlining the site planning and streetscape campus enhancements associated with the
abandonment of designated sections of North Bradford Street, Fulton Street, Cecil Street, and
several alleys in the Wesley College campus area. The submission included the Record Plan for
vacated right-of-way and a Master Plan consisting of five phases of site improvements including
pedestrian amenities, paving, landscaping, and parking lot reconfiguration/construction. At its
meeting of August 15, 2011, the City of Dover Planning Commission moved to grant conditional
approval of the Site Development Master Plan for the Wesley College Master Plan for
Streetscape Campus Enhancements. The approval was granted accordance with the conditions of
approval outlined in the Development Advisory Committee (D.A.C.) Report dated August 4,
2011.
The applicant has taken the next steps and filed the Administrative Site Plan (S-12-01) for the
Wesley College Streetscape project including an overall plan showing the areas to be vacated.
This submission is currently under review by Staff and other City Department and agencies.
Recommendation of Planning Staff on Revision Request:
Staff recommends in favor of this request to allow the street and alley abandonment of the
designated areas (Areas #1-7) to occur immediately rather than coinciding with physical
construction activities. The previous Staff concerns about the abandonment of the public streets
and alleys occurring without an approved plan for redevelopment and incorporation of the areas
into the Campus has been mitigated through actions taken by Wesley College. The College has
presented and received conditional approval from the Planning Commission for a Site
Development Master Plan to develop a series of streetscape and campus enhancements in these
areas. They are also working on the Record Plans to document the formal transfer of ownership.
Staff also recommends that upon abandonment the “one way” segments of North Bradford Street
that will remain public streets be open to two-way traffic to provide adequate access and
Page 5
Request for Revision to MI-10-06 – Street & Alley Abandonment Request of Wesley College
Report to Utility Committee from Planning Commission Meeting of 2/12/2012
Page 4
circulation for those properties that are accessed off of these segments of North Bradford Street.
This Staff recommendation was presented prior to public comment.
Recommendation of Planning Commission on Revision Request:
The Planning Commission conducted a Public Hearing and considered this Request for
Revisions to the conditions of approval for the Street and Alley Abandonment of Wesley College
Areas #1-7 at their meeting of February 21, 2012. Following a public hearing, the Planning
Commission voted to recommend approval of the Revisions as requested by Wesley College
to allow for the immediate abandonment of the streets and alleys with a vote of 6-0 (with 3
members absent). An excerpt of the of the Planning Commission minutes is included for your
reference.
Excerpt from February 21, 2012 Planning Commission Minutes:
MI-10-06 Revision to Request for Street and Alley Abandonment: Portions of North
Bradford Street, Fulton Street, Cecil Street, and Alleys – Public Hearing and Review
and Recommendation to City Council on a request for revisions to the conditions of
approval for the abandonment of several improved streets and alleys within the Wesley
College Campus limits. This previous request for a series of street and alley
abandonments for Wesley College (Areas #1-7) was considered by the Planning
Commission on April 19, 2010 with City Council action on August 9, 2010 approving the
abandonment subject to a series of conditions. The request consists of seven areas:
Area #1 – North Governors Avenue Alley West between Fulton Street and Cecil Street;
Area #2 – Portion (100 feet) of North Governors Alley West north of Cecil Street; Area
#3 – Portion (363 feet) of North Bradford Street south of Fulton Street; Area #4 – Fulton
Street between North Governors Avenue and North State Street; Area #5 – Portion (443
feet) of Cecil Street east of North Governors Avenue; Areas #6 – Portion (194 feet) of
North Bradford Street north of Cecil Street; and Area #7 – Portion (275 feet) of North
State Street Alley West south of Fulton Street. This request was filed by Wesley College.
(Resolution #2010-07)
Representative: Mr. Gregg Moore, Becker Morgan Group, Inc.
Mrs. Townshend stated that the Planning Commission previously reviewed and
recommended approval and City Council approved abandonment of seven (7) areas of
public streets and alleys surrounding the Wesley College Campus. Where that action
took place, it is all areas where Wesley College was the property owner on either side of
the street or alley with the idea that this right-of-way would just be absorbed into the
campus.
Mrs. Townshend further stated that the Planning Commission recommended in favor of
the abandonment and then it moved on to the Utility Committee and the motion for
approval for the abandonment included that the timing of the abandonment would be
such that the City would not give up ownership and maintenance responsibilities until
those streets and alleys are physically altered under a Site Plan approved by the
Planning Commission. The reason that the approval was recommended that way is
because the concern was that if it was just tied to the Site Plan application and not to the
actual physical alteration and the Site Plan expired, the concern was that the City would
have abandoned these streets and nothing would have happened.
Page 6
Request for Revision to MI-10-06 – Street & Alley Abandonment Request of Wesley College
Report to Utility Committee from Planning Commission Meeting of 2/12/2012
Page 5
Mrs. Townshend further stated that at this time, Wesley College is moving ahead on this
Streetscape Project. They are looking to get started in the very near future and finished
by the end of the summer. The challenge is because they do not have the ability to
record this as theirs, it is affecting their financing and finalization of their Site Plans.
Mrs. Townshend further stated that from Staff’s position, the major concern was that
they not be abandoned in advance to the point that we are not going to end up having a
streetscape project yet we abandoned the streets. They are happening in tandem as
expected and it is more a technical point as to when the abandonment takes place. Staff
is comfortable stating that this project is moving forward and that this can now take
place.
Mrs. Townshend further stated that the Planning Commissions role is to forward a
recommendation to City Council. Coming out of this meeting, there would be a meeting
of the Utility Committee and then a recommendation to City Council who would hold a
public hearing.
Mr. Moore stated that the Board of Directors at Wesley College has voted and they are
proceeding with the project. They want to begin construction as soon as the students
depart at the end of the next semester and try to finish before their return in the fall.
They have already paid close to $123,000 to Verizon Wireless to start burying utility lines
throughout parking lots and the area. The reason that we are here this evening is to
take the properties over because there is some funding that the university needs to get
from a bank institution and the bank institution wants to make sure they have the
properties.
Mr. Moore stated that Wesley College will go ahead with both sides of this project
meaning both north and south all at one time so that it is over and there is less
construction. A PowerPoint presentation was provided by Mr. Moore depicting where
there would be walking paths, benches, seating and garden areas that would enhance
the campus. On the north side of Bradford Street, he showed a 3-D version where
Bradford Street looking at where the parking lot would be and you can see the
streetscape walking path that leads up to the DuPont Building with benches and seating
throughout that area. Currently, if you look up Bradford Street and looked at the DuPont
building, you would see cars dominating that vision and what he is showing you is what it
does for that area.
Mr. Tolbert questioned if the matter with Campus Community School has been
resolved? Responding to Mr. Tolbert, Mr. Moore stated that the Campus Community
School is departing. This will be their last semester there and they will move over to the
Pear Street location and proceed. Dr. Johnston and the Wesley Staff have
communicated with them and they are aware of what is happening with the project.
Mr. Hemmig opened a public hearing and after seeing no one wishing to speak closed
the public hearing.
Mr. Tolbert moved to forward a recommendation of approval to City Council for MI-10-06
Revisions to Request for Street and Alley Abandonment: Portions of North Bradford
Street, Fulton Street, Cecil Street, and Alleys, seconded by Mr. Shomo and the motion
was unanimously carried 6-0 with Mr. Holt, Mr. Nichols and Colonel Welsh absent.
Page 7
Request for Revision to MI-10-06 – Street & Alley Abandonment Request of Wesley College
Report to Utility Committee from Planning Commission Meeting of 2/12/2012
Page 6
Advisory Comments to the Applicant:
1. The Planning Commission’s role is to make a recommendation to City Council on the
matter. City Council has ultimate authority on the Revision to the Approved request for
abandonment.
2. The recordation of the vacated rights-of-way shall coincide with the conditions outlined
in the Abandonment Resolution #2010-07 and/or any revisions to such conditions.
3. The applicant will need to work with City Staff and the City Solicitor’s Office in regards
to the format for this Record Plan set and any associated documents to convey the right-
of-way from the City of Dover to Wesley College. This includes the format of new
parcels, easement locations, the timing of abandonment, terminology, etc. A Record Plan
was received for review by the Planning Office on December 9, 2011 as part of the
Administrative Site Plan submission (S-12-01) for the Wesley College Master Plan
Streetscape Project.
4. If the request for revision to the conditions of abandonment is successful, additional
coordination with various City departments will be necessary to address utility
infrastructure access, the need to maintain emergency access, and the development (and
approval) of a Record Plan documenting a transfer of ownership and associated
infrastructure easements.
5. Abandonment of public streets and alleys does not constitute approval for physical
alteration of such streets and alleys. Any modification or ground-disturbing activity must
be reviewed through the appropriate site plan process and receive all requisite approvals
by regulatory agencies.
Attachments: DAC Agency Comments
Letter of Request dated December 21, 2011
Plan Exhibits (2 sheets)
Resolution #2010-07 as Adopted August 9, 2010
Page 8
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: FEBRUARY 1, 2012
APPLICATION: REVISION TO REQUEST FOR STREET &
ALLEY ABANDONMENT: PORTIONS OF N.
BRADFORD STREET, FULTON STREET,
CECIL STREET & ALLEYS
FILE #: MI-10-06
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Steve Enss - Electric
Jason A. Lyon - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER / STORMWATER
1. All public electric, water, wastewater and storm sewer infrastructure must be located within a public utility easement or
right-of-way. As such the “Recommendations Suggested as Conditions of Approval to Meet Code Objectives” should
be required in order to consider the abandonment of the streets and alleys requested by the applicant.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER / STORMWATER
1. Permanent public utility easements must be provided to allow for the operation, maintenance, repair, replacement,
etc. of all electric, water, wastewater and storm sewer infrastructure. Please add a note on each street depicting the
proposed easement.
2. Indicate on the plans that vehicular access will be provided for the operation, maintenance, repair, replacement, etc.
of all electric, water, wastewater and stormwater infrastructure.
3. No temporary or permanent structures, including signage or stormwater management areas, shall be placed within
the easement areas established.
4. In the event it is determined feasible that any of the utilities could be relocated, the applicant will be responsible for all
costs associated with doing so.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. The Electric Department has pole attachment leases with both phone and cable on some of the phone lines.
Page 9
Revised Request for Street and Alley Abandonment: Portions of North Bradford Street, Fulton Street, Cecil Street and Alleys
File #: MI-10-06
February 1, 2012
Page 2 of 2
WATER / WASTEWATER / STORMWATER
1. None.
GENERAL
1. It should be noted that other, non-City of Dover utilities may be located within the existing right-of-ways, such as gas
and communications, for which the applicant will be required to provide easements and meet other requirements as
well.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 10
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: February 1, 2011 T
===============================================================
APPLICATION: Revision to Request for Street and Alley Abandonment: Portion of
North Bradford Street, Fulton Street, Cecil Street, and Alleys
FILE#: MI-10-06 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. DelDOT has no comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
As noted in a previous DAC comments letter dated, July 28, 2011, the documents from both the
City Officials and the applicant were received and reviewed, and the Department has concurred
with the supportive approaches to rescind from the original comment about performing traffic
count at numerous intersections. As a result, the Department has no comments for the first two
phases of this project.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 19
PETITION TO ABANDON ALLEY
Before the City of Dover
Utility Committee on March 12, 2012
Applicants/Owners: Wesley College
Location: Area #8: Fulton Street Alley South
Alley located between North Bradford Street (Area #3) and North
State Street Alley West (Area #7)
Tax Parcel: No Tax Parcel Identification, considered public right-of-way
Present Use: Within existing Parking Lot
Proposed Use: Within Reconfigured Parking Lot as part of integration into
walkable campus
Reason for Request: To implement the Wesley College Master Plan’s recommendation
for creating a more pedestrian-oriented campus
File Number: MI-12-02
Wesley College has requested that the City abandon an alley on the campus of Wesley College.
This request is being made as part of the implementation of the Wesley College Master Plan. In
August 2010, a related request to abandon a series of street segments and alleys (Areas #1-7) in
the vicinity of the Wesley College Campus was approved by City Council. As part of the work to
develop the Record Plat to document the vacation of those streets and alley, this additional alley
known as the Fulton Street Alley South was discovered.
Existing Property:
The subject right-of-way requested for abandonment consists of a public alley dedicated to the
City of Dover. This segment of Fulton Street Alley South is approximately 125.35 feet in length
and ten feet in width. However, this Alley (Area #8) does not function as an alley as a path of
travel between two connecting streets/alleys. It is part of the current layout of an existing parking
lot. It is adjacent on both sides to other properties owned by Wesley College. See submitted plan
drawings.
The Site Development Master Plan S-11-13 Wesley College Master Plan for Streetscape Campus
Enhancements shows that this parking lot is proposed to be reconfigured to improve the traffic
circulation and layout of the parking lot.
Page 20
MI-12-02 –Alley Abandonment Request of Wesley College
Report to Utility Committee from Planning Commission Meeting of 2/21/2012
Page 2
Recommendation of the Planning Staff:
The Planning Staff supports this alley abandonment request finding that this specific alley does
not function as an alley within the overall street network of the area. In addition, portions of the
street and the alley immediately connecting to this alley segment were approved for
abandonment by City Council with Resolution #2010-07. The area is to be incorporated into an
improved parking lot area associated with the site improvements to create a pedestrian-oriented
campus for Wesley College. To the extent that long-term abandonment of the subject alley will
help accomplish this objective, staff supports the request. This Staff recommendation was
presented prior to public comment.
Recommendation of the Planning Commission
The Planning Commission conducted a Public Hearing and considered this Request for Alley
Abandonment at their meeting of February 21, 2012. Following a public hearing, the Planning
Commission voted to recommend approval of the alley abandonment for Area #8 – Fulton
Street Alley South as requested by Wesley College with a vote of 6-0 (with 3 members
absent). An excerpt of the of the Planning Commission minutes is included for your reference.
Excerpt from February 21, 2012 Planning Commission Minutes:
MI-12-02 Request for Alley Abandonment: Fulton Street Alley South – Public
Hearing and Review and Recommendation to City Council of a request to abandon an
improved alley within the Wesley College Campus limits. This request consists of one
area: Area #8 – Fulton Street Alley South between North Bradford Street and North
State Street Alley West. This request was filed by Wesley College.
Representative – Mr. Gregg Moore, Becker Morgan Group, Inc.
Mrs. Melson-Williams stated that this is a petition to abandon a segment of alley. You
have seen some alley abandonments previously for the Wesley College Campus. This
portion of alley was discovered by the engineer in preparing some follow-up plans on the
previous abandoned streets and alleys. What was discovered is that there is an existing
alley named the Fulton Street Alley South that is located spanning between North
Bradford Street and the North State Street Alley to the south of Fulton Street. It does not
function as an alley. It is basically part of an improved parking lot; however, it exists in
the deed record for property in the area.
Mrs. Melson-Williams further stated that the applicant is seeking abandonment of this
alley and because it is improved by the parking lot, it has to move through this process
with the Planning Commission providing a recommendation that then moves onto the
City Council Committee and then to City Council for a hearing on its abandonment. This
is located in the middle of what is the existing Wesley College parking lot so the adjacent
properties to the north and south are Wesley College owned.
Mrs. Melson-Williams further stated that the Planning Staff is recommending approval of
the alley abandonment request finding that this specific alley does not function as an
alley within the overall street network of the area and that the area is to be incorporated
into the improved parking lot area with the Wesley College Campus Streetscape
Enhancement Project that was previously approved by the Planning Commission as part
of a Site Development Master Plan.
Page 21
MI-12-02 –Alley Abandonment Request of Wesley College
Report to Utility Committee from Planning Commission Meeting of 2/21/2012
Page 3
Mrs. Melson-Williams further stated that the Planning Staff has provided some Staff
comments in regards to the project noting that the Planning Commission is making a
recommendation that ultimately moves onto City Council for consideration. As part of
the alley abandonment, it has to go through a Record Plan process to document the
transfer of ownership should the abandonment be approved and that any alterations are
then subject to whatever plan review processes.
Mrs. Melson-Williams further stated that comments were received from other City
Departments: Electric Department, Public Works Department and the Department of
Transportation. This application is specific to what is known as Area #8 for an alley
abandonment.
Mr. Moore stated that this is just a housekeeping item and Wesley College owns
property on both sides so there are no affected property owners.
There were no questions raised from any Planning Commission members at this time.
Mr. Hemmig opened a public hearing and seeing no one wishing to speak closed the
public hearing.
Mr. Tolbert moved to forward a recommendation of approval to City Council for MI-12-02
Request for Alley Abandonment: Fulton Street Alley South, seconded by Mr. Shomo and
the motion was unanimously carried 6-0 with Mr. Holt, Mr. Nichols and Colonel Welsh
absent.
Advisory Comments to the Applicant:
1. The Planning Commission’s role is to make a recommendation to City Council on the
matter. City Council has ultimate authority on the request for abandonment.
2. If the Request for Alley Abandonment is successful then the development (and approval)
of a Record Plan documenting a transfer of ownership is required. It does not appear that
there will be a requirement for easements as no utilities are located in this area.
a. Refine the language in General Note #4 as a utility/pedestrian easement will not
be required for this alley segment (Area #8). However, the easement remains a
requirement for Area #1-7.
3. Abandonment of public alleys does not constitute approval for physical alteration of such
alleys. Any modification or ground-disturbing activity must be reviewed through the
appropriate site plan process and receive all requisite approvals by regulatory agencies. It
is noted that this area is part of the Site Development Master Plan S-11-13 Wesley
College Master Plan for Streetscape Campus Enhancements conditionally approved by
the Planning Commission on August 15, 2011 with an Administrative Site Plan currently
under review detailing the specific construction details for the project.
Attachments: DAC Agency Comments
Letter of Request dated December 21, 2011
Plan Exhibits (2 sheets)
Description of Alley
Page 22
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: FEBRUARY 1, 2012
APPLICATION: REQUEST FOR ALLEY ABANDONMENT:
FULTON STREET ALLEY SOUTH
FILE #: MI-12-02
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Steve Enss - Electric
Jason A. Lyon - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER
1. Our office has no objections to the proposed alley abandonment.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER
1. None
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 23
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: February 1, 2011 T
===============================================================
APPLICATION: Request for Alley Abandonment: Fulton Street Alley South
FILE#: MI-12-02 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. DelDOT has no comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
As noted in a previous DAC comments letter dated, July 28, 2011, the documents from both the
City Officials and the applicant were received and reviewed, and the Department has concurred
with the supportive approaches to rescind from the original comment about performing traffic
count at numerous intersections. As a result, the Department has no comments for the first two
phases of this project.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 29
Fulton Street Alley South
Proposed Alley Abandonment
107 ON
T
RING WN
!
.
HA R
!Ò§ NT O
DOW
120 105 R DO
WESLEY TES,E
LIZA
MON
COLLEGE &
OL G
A
.
! N
ve
!Ò§× w ar e A
Dela
at e S
n St
N St
×
o
Fult !Ò§
!Ò§ 44
LEY
WES GE
!
. t
LE
C OL
×
.
! §Ò !Ò§
30
!
LEY
W S GE
E !Ò§
LE
!Ò§ C OL
34
×
LEY
W S GE
E
31
!Ò§ LE
C OL
LEY
WES GE
LE 28
C OL LEY
29 W S GE
E
LE
LEY C OL
N Br WES GE
LE
!Ò§
!Ò§ C OL 22
25
rd S
LEY
LEY WES GE
112 adfo W S GE
E
LE C OL
LE
C OL
WESLEY
t !Ò§
16 IS
!Ò§ ANC
COLLEGE 21 !Ò§ !Ò§ T FOR
D,FR
LEY
A
STR A
.
!
W S GE
E &
LE OL
.
!
CAR
C OL D
10
DEL
ST
!Ò§!Ò§ TRU AL
9 CAP T
IT
LEY MGM
W S GE
E INC
L E 2
C OL 3 STAT Y
E
T E A LT
FIRS T R S
DING
!Ò§ IS
BAPT CH HOL C
CHUR LL
0 50 100 200 Feet !Ò§
¯
Legend
Date Printed: January 20, 2012 !Ò§ Overhead Electric Pole × Hydrants
File: m:\gis_data\projects/tech_mxds Underground Electric Lines .
! Manholes
\street_abandonment_map_wesley_college Overhead Electric Lines Sewer Line
Department: Public Services GIS Secondary OH Conductor Right of Way to be Abandoned
City of Dover, Delaware Water Main Dover Parcels
Hydrant Line
Page 30
Page 1 of 5
City of Dover
Capital Investment Plan
Project Tracking Report
January 31, 2012
Points to Remember -
* Original Project Budget = Original Total Project Budget initially included in approved annual budget.
* Latest Project Budget = Revised Total Project Budget included in most recent approved annual budget or one of the following:
bond resolution, revolving fund loan agreement, Council approved budget amendment, or City Manager approved amendment as per
the Budget Amendment Procedure.
* Current Fiscal Year - Revised Fiscal Year Budget = Current Year approved project budgets plus carry forward balances of unspent
budgets in the prior fiscal year. Project Carry Forward balances will be submitted to City Council for amendment in January 2010.
Can also be amended with City Manager approval per the Budget Amendment Procedure.
* Water Quality, Inflow/Infiltration, Distribution Upgrades and New Development projects are budgeted as a blanket project and once
individual projects are identified and estimated they are created using an allocation of the overall budgeted amount.
* Status and Comments provided by City Manager.
* For Finance purposes projects are considered completed when placed in service and all charges have been processed.
Community Water & Total
Current Year Budget Funding Sources General Transportation Wastewater Electric CIP
Budget Balance $ 78,000 $ 118,588 $ 430,591 $ 360,333 $ 987,512
Library Funding - FY11 Budget Balance 100,962 - - 87,045 188,007
Federal and/or State Grants 7,422,183 1,400,000 - - 8,822,183
Library Green Energy/Bridge Loan 2,700,000 - - - 2,700,000
Friends of the Library Donation 210,000 - - - 210,000
Kent County Library Contribution 1,000,000 - - - 1,000,000
Library Reserve 2,590,784 - - - 2,590,784
Construction Loan 274,961 - - - 274,961
Community Transportation Fund - FY11 Balances - 678,612 - - 678,612
Revolving Fund Loans - - 4,309,821 - 4,309,821
Transfer from Capital Reserves - - - 370,730 370,730
Impact Fees - - 867,032 - 867,032
Loan Proceeds - Streets & City Hall 1,970,000 - - - 1,970,000
Transfer Loan Proceeds to CT Fund - Streets - 875,000 - - 875,000
Transfer from Operating Funds 623,847 - 1,750,000 3,500,000 5,873,847
Interest Earned 10,900 2,800 - 38,400 52,100
Total Funding Sources (Unaudited) $ 16,981,637 $ 3,075,000 $ 7,357,444 $ 4,356,508 $ 31,770,589
Page 31
City of Dover
General Fund - Major CIP Projects Page 2 of 5
January, 2012
Hide TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY2009
Bid Pack A - Done.
2 LB0901 M/G New Library Project $ 18,200,000 $ 20,469,080 $ 8,341,416 $ 12,127,664 40.8% $ 11,195,009 $ 14,298,890 $ 4,171,226 29.2% Started Bid Pack B - 40% Complete/Construction
3 Totals - FY09 $ 18,200,000 $ 20,469,080 $ 8,341,416 $ 12,127,664 40.8% $ 11,195,009 $ 14,298,890 $ 4,171,226 29.2%
4
5 FY2012
6 --- Ann FD Truck Payment $ 244,820 $ 244,820 $ 216,794 $ 28,026 88.6% $ 244,820 $ 244,820 $ 216,794 88.6%
Sweeper due in Jan. 2012; Sanitation
7 --- Vehicles & Equipment 377,927 377,927 29,299 348,628 7.8% 377,927 377,927 29,299 7.8% Truck due in March 2012;
Roof Replacement @
8 PR1201 Dover Park 30,000 30,000 - 30,000 0.0% 30,000 30,000 - 0.0%
9 CT Fund B/L Streets & Alleys Program 1,000,000 1,750,000 - 1,750,000 0.0% 1,000,000 1,750,000 - 0.0% Pending financing
10 ST1202 Concrete Program 30,000 30,000 - 30,000 0.0% 30,000 30,000 - 0.0% Bid development in process
Streets Dump Truck
11 ST1203 Refurbishment 30,000 30,000 1,521 28,479 5.1% 30,000 30,000 1,521 5.1% In progress
12 City Hall Sprinkler System - - - - 0.0% - 220,000 - 0.0%
13 Totals - FY12 $ 1,712,747 $ 2,462,747 $ 247,614 $ 2,215,133 10.1% $ 1,712,747 $ 2,682,747 $ 247,614 9.2%
14
15 Grand Totals $ 19,912,747 $ 22,931,827 $ 8,589,030 $ 14,342,797 37.5% $ 12,907,756 $ 16,981,637 $ 4,418,840 26.0%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
G = Grant funded project
B/L = To be financed through bonds or commercial loan; Projects will be completed through CT Fund, therefore the loan proceeds will be transferred from Capital Fund into the Community Transportation Fund
Page 32
City of Dover
Community Transportation & General Fund Street Funds - Major CIP Projects Page 3 of 5
January, 2012
Hide TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY 2007
2 CT0708 M E. Water Street Brick $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ - $ 65,000 $ - 0.0% Specialty contract needed.
3 Totals $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ - $ 65,000 $ - 0.0%
4
5 FY 2009
6 CT0977 M Schutte Parking Lot $ 21,950 $ 21,950 $ - $ 21,950 0.0% $ - $ 21,950 $ - 0.0% Deferred
7 CT1165 M Rte. 13,N. State -Kings Hwy 591,662 591,662 - 591,662 0.0% - 591,662 - 0.0%
8 Totals $ 613,612 $ 613,612 $ - $ 21,950 0.0% $ - $ 613,612 $ - 0.0%
9
10 FY2012
Concrete work on Independence
11 CT M Street Projects - State Funds $ 950,000 $ 800,000 $ 9,135 $ 790,865 1.1% $ 950,000 $ 121,388 $ 9,135 7.5% In process Blvd complete
Concrete work on Hazel to
12 Various B/L Street Projects - General Fund 350,000 1,750,000 15,300 1,734,700 0.9% 350,000 875,000 15,300 In process proceed in January/February
13 CT1201 M North Street Roundabout - 500,000 - 500,000 0.0% - 500,000 - 0.0% In process 60% complete
14 TE1201 M Lincoln Park Center 900,000 900,000 4,788 895,212 0.0% 900,000 900,000 4,788 0.5%
15 Totals $ 2,200,000 $ 3,950,000 $ 29,223 $ 3,920,777 0.7% $ 2,200,000 $ 2,396,388 $ 29,223 1.3%
16
17 Grand Totals $ 2,878,612 $ 4,628,612 $ 29,223 $ 4,007,727 0.6% $ 2,200,000 $ 3,075,000 $ 29,223 1.3%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
C = Project funded by combination of CT Funds and General Fund
B/L = To be financed through bonds or commercial loan; Projects will be completed through CT Fund, therefore the loan proceeds will be transferred from Capital Fund into the Community Transportation Fund;
Page 33
City of Dover
Water/Wastewater Improvement & Extension Fund - Major CIP Projects Page 4 of 5
January, 2012
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Approved Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY 2008
Option to purchase land agreement
2 WD0804 M
1.0 MG Elevated Water Storage $ 4,196,600 $ 2,590,000 $ 29,099 $ 2,560,901 1.1% $ - $ 178,916 $ 8,015 4.5% Started under review
3 WD0805 M
Piney Point Well 398,800 665,000 69,316 595,684 10.4% - 147,319 1,634 1.1% Started DNREC permitting ongoing
US 13 East Sanitary Sewer
4 WW0810 M/SL Interceptor 2,376,800 3,022,562 3,231,960 (209,398) 106.9% - 295,722 286,361 96.8% Complete Complete
5 Totals - FY08 $ 6,972,200 $ 6,277,562 $ 3,330,375 $ 2,947,187 53.1% $ - $ 621,957 $ 296,010 47.6%
6
7 FY2009
8 WQ0905 M/SL Bayard Avenue $ 590,910 $ 490,910 $ 475,888 $ 15,022 96.9% $ - $ 239,121 $ 189,098 79.1% In process Complete; Final invoice Jan 2012;
9 WQ0907 M/SL Route 13 Water Main 1,058,700 2,282,682 1,944,598 338,084 85.2% - 1,869,872 1,531,787 81.9% In process Constr complete; Punchlist & Insp;
10 Totals - FY09 $ 1,649,610 $ 2,773,592 $ 2,420,485 $ 353,107 87.3% $ - $ 2,108,993 $ 1,720,885 81.6%
11
12 FY2010
Work is complete; close out
13 WW1001 M/SL Inflow/Infiltration Removal $ 1,800,000 $ 2,122,536 $ 1,761,684 $ 360,852 83.0% $ 1,800,000 $ 766,201 $ 404,128 52.7% In process documents/final invoice in progress
14 WW1007 M/SL Fox Hall Pump Station 427,900 392,044 50,491 341,553 12.9% - 360,687 278 0.1% Started Will start after Heatherfield;
15 WW1008 M/SL Heatherfield F/M Rerouting 220,400 324,916 48,973 275,943 15.1% - 237,506 278 0.1% Started Project 75% complete; Not paid yet;
Resolution of easement issue
16 WW1010 I Tar Ditch Interceptor Upgrade 518,230 518,230 28,014 490,216 5.4% - 495,359 5,143 1.0% Started pending;
17 Totals - FY10 $ 2,966,530 $ 3,357,726 $ 1,889,162 $ 1,468,564 56.3% $ 1,800,000 $ 1,859,753 $ 409,828 22.0%
18
19 FY2011
20 WQ1103 WQI - Ross Street - 71,840 - 71,840 0.0% 71,840 36,840 - 0.0% Preliminary design complete
21 WW1101 M/SL Inflow/Infiltration Removal 500,000 500,000 364,340 135,660 72.9% - 457,601 321,940 70.4% Started Project 97% complete;
22 WW1104 SL Lepore Road P/S Replacement 52,000 402,000 71,661 330,339 17.8% 350,000 350,000 16,125 4.6% Started Final design revisions pending;
23 Totals - FY11 $ 552,000 $ 973,840 $ 436,001 $ 537,839 44.8% $ 421,840 $ 844,441 $ 338,065 40.0%
24
25 FY2012
26 --- Vehicles & Equipment $ 115,000 $ 115,000 $ 110,514 $ 4,486 96.1% $ 115,000 $ 115,000 $ 110,514 96.1% In process Vehicles received;
27 WD1201 Pay-As-You-Go Water Station 30,240 30,240 - 30,240 0.0% 30,240 30,240 - 0.0% Specs being developed
28 WD1202 R Misc. Distribution Upgrades 60,000 60,000 5,706 54,294 9.5% 60,000 60,000 5,706 9.5% Misc. repairs or emergencies
29 WD1203 R Wellhead Redevelopment Program 65,000 65,000 42,821 22,179 65.9% 65,000 65,000 42,821 65.9% In process Well #1 complete; Well #9 rehab
30 WD1204 R Emergency Generators 80,000 80,000 - 80,000 0.0% 80,000 - - 0.0% Grant dependent
31 WQ1201 WQI - Wesley Campus 51,200 51,200 - 51,200 0.0% 51,200 51,200 - 0.0% Installation to begin late February
32 WQ1202 WQI - New Street 97,120 97,120 9,600.00 87,520 9.9% 97,120 97,120 9,600 9.9% Started Design started;
33 WQ1203 WQI - Silver Lake 279,840 279,840 98,585.59 181,254 35.2% 279,840 279,840 98,586 35.2% In process Construction started
34 WW1201 M/SL Inflow/Infiltration Removal 1,000,000 1,000,000 22,725 977,275 2.3% 1,000,000 1,000,000 22,725 2.3% Started Design started, early spring const.
35 WW1202 R SCADA Equipment Replacement 84,900 84,900 65,696 19,204 77.4% 84,900 84,900 65,696 77.4% In process Project 50% complete
36 WW1203 R Misc. Sewer System Improve 37,000 37,000 9,935 27,065 26.9% 37,000 37,000 9,935 26.9% Misc. repairs or emergencies
37 WW1204 M Wilmington College Pump Station 25,000 25,000 8,627 16,373 34.5% 25,000 25,000 8,627 34.5% Started Design started - actually Baltray PS
38 WW1205 M Dover Brook Gardens P/S Replace 15,000 15,000 3,345.57 11,654 22.3% 15,000 15,000 3,346 22.3% Started Design started
39 WW1206 M Brandywine Pump Station Replace 52,000 52,000 12,624.52 39,375 24.3% 52,000 52,000 12,625 24.3% Started Design started
McKee Rd Pump Station Design started
40 WW1207 M Communator Replacement 10,000 10,000 2,050.62 7,949 20.5% 10,000 10,000 2,051 20.5%
41 $ 2,002,300 $ 2,002,300 $ 392,229.63 $ 1,610,070 0.0% $ 2,002,300 $ 1,922,300 $ 392,230 20.4%
42
43 Grand Totals $ 14,142,640 $ 15,385,020 $ 8,468,254 $ 6,916,766 55.0% $ 4,224,140 $ 7,357,444 $ 3,157,018 42.9%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
SL = State Loan Project - construction phase is financed
I = Impact Fee (partially) financed project
Page 34
City of Dover
Electric Improvement & Extension Fund - Major CIP Projects Page 5 of 5
January, 2012
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Current Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY2011
2 EG1102 M Units 1 & 2 Cooling Tower 372,400 199,140 134,538 64,602 67.6% 25,410 25,410 400 1.6% Work deferred to 2012
3 EG1107 M Units 1 & 2 Life Extension 802,000 409,000 269,517 139,483 65.9% 184,000 196,331 56,848 29.0% Motor work this spring
4 EG1112 M Unit 3 Heat Expansion Joint - 150,000 143,508 6,492 95.7% 70,000 82,807 76,315 92.2% Complete
5 EG1113 Units 1 & 2 Control Modifications - 150,000 138,733 11,267 92.5% - 25,700 14,432 56.2% Started Complete w/Spring outage
6 EG1114 Unit 3 Gas Line Modification - 60,000 39,516 20,484 65.9% - 36,207 15,723 43.4% Complete
7 $ 1,174,400 $ 968,140 $ 725,812 $ 242,328 75.0% $ 279,410 $ 366,455 $ 163,719 44.7%
8
9 FY2012
10 --- Vehicles & Equipment $ 168,828 $ 168,828 $ 71,241 $ 97,587 42.2% $ 168,828 $ 144,328 $ 71,241 49.4% All vehicles received
11 EE1201 Substation PT & CT Replacement 267,715 267,715 188,708 79,007 70.5% 267,715 267,715 188,708 70.5% In process 75% materials received
12 EE1202 R Lighting Project & Rehabilitation 50,000 50,000 49,832 168 99.7% 50,000 50,000 49,832 99.7% Complete
13 EE1203 R Equipment Replacement 40,000 40,000 10,525 29,475 26.3% 40,000 40,000 10,525 26.3% In process Equipment ordered
14 EE1204 Generator Replacement 50,000 50,000 30,961 19,039 61.9% 50,000 50,000 30,961 61.9% Complete
15 EE1205 M Frazier Substation Upgrade 765,247 155,000 110,881 44,119 71.5% 155,000 155,000 110,881 71.5% In process Materials ordered
16 EE1206 R Disb. Feeder Replacement 377,510 377,510 238,729 138,781 63.2% 377,510 377,510 238,729 63.2% In process On-going
17 EE1207 R Disb. Capacitors & Controls 100,000 100,000 26,494 73,506 26.5% 100,000 100,000 26,494 26.5% In process Materials ordered
18 EE1208 R Transmission Line Maintenance 75,000 75,000 26,967 48,033 36.0% 75,000 75,000 26,967 36.0% Started Materials ordered
Scada Master Hardware
19 EE1209 Replacement 75,000 75,000 71,560 3,440 95.4% 75,000 75,000 71,560 95.4% Started Materials ordered
20 EE1210 Substation Battery - 24,500 15,251 9,249 62.2% 24,500 24,500 15,251 62.2% In process 60% materials received
21 EE1212 R UG Transformers 70,536 70,536 49,651 20,885 70.4% 70,536 70,536 49,651 70.4% In process On-going
22 EE1212 R UG Conductors 479,464 479,464 193,856 285,608 40.4% 479,464 479,464 193,856 40.4% In process On-going
23 EE1212 R Meters 50,000 50,000 17,652 32,348 35.3% 50,000 50,000 17,652 35.3% In process On-going
24 EG1201 Unit 3 Boiler Air Heater 440,000 440,000 76,677 363,323 17.4% 440,000 440,000 76,677 17.4% Started Bid rec'd; CAF to Council 2/12
25 EG1202 M Unit 3 Boiler Systems 390,000 130,000 - 130,000 0.0% 130,000 130,000 0.0% Will complete Spring outage;
Unit 3 FD & ID Fan Control Damper
26 EG1203 Upgrade 92,000 92,000 1,478 90,522 1.6% 92,000 92,000 1,478 1.6% Started Developing contract scope/bid
Unit 3 DCS Computers & Software
27 EG1204 Upgrades 85,000 85,000 - 85,000 0.0% 85,000 85,000 - 0.0% To be completed by 6/3012;
28 EG1205 R Misc. Equipment Replacement 70,000 70,000 21,280 48,720 30.4% 70,000 70,000 21,280 30.4% In process On-going; 50% complete
Demineralizer Control Replace @
29 EG1206 McKee Run 65,000 65,000 - 65,000 0.0% 65,000 65,000 - 0.0% Bids in Feb; Complete by June
Unit 11 Component Replacement @
30 EG1207 M Van Sant 50,000 50,000 24,595 25,405 49.2% 50,000 50,000 24,595 49.2% In process Remaining scoped in devlpmnt
Switchyard Blast Walls @ McKee Developing work scope; To be
31 EG1208 Run 50,000 50,000 5,328 44,672 10.7% 50,000 50,000 5,328 10.7% In process completed June 2012
32 EG1209 M Building Preservation @ McKee Run 38,000 38,000 5,650 32,350 14.9% 38,000 38,000 5,650 14.9% In process Sent out bids; Completion 6/12
Unit 3 Cooling Water Line Life
33 EG1210 M Extension 25,000 25,000 - 25,000 0.0% 25,000 25,000 - 0.0% Defer to FY13
34 EG1211 M Unit 3 Stack Repairs 25,000 25,000 - 25,000 0.0% 25,000 25,000 - 0.0% On track for spring outage; Bid
35 EG1212 M Unit 3 Turbine Inspection 1,021,000 348,000 8,634 339,366 2.5% 348,000 348,000 8,634 2.5% In process High bid; Council amendment;
Partial completion; scope to
36 EG1213 M Unit 3 Aux System Components 542,000 113,000 47,682 65,318 42.2% 113,000 113,000 47,682 42.2% In process finish being developed
37 EU1201 R Distribution Upgrades 500,000 500,000 230,655 269,345 46.1% 500,000 500,000 230,655 46.1% In process On-going
38 $ 5,962,300 $ 4,014,553 $ 1,524,285 $ 2,490,268 0.0% $ 4,014,553 $ 3,990,053 $ 1,524,285 38.2%
39
40 Grand Totals $ 7,136,700 $ 4,982,693 $ 2,250,097 $ 2,732,596 25.0% $ 4,293,963 $ 4,356,508 $ 1,688,004 38.7%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year.
B = Bonded Project
S = State fully or partially reimbursed project