Page 1
CITY OF DOVER, DELAWARE
PLANNING COMMISSION
Monday, May 16, 2022 at 7:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover
DE 19903 and via email at CompPlan@dover.de.us.
VIRTUAL MEETING NOTICE
The Planning Commission Meeting for May 16, 2022 will be held as an In-Person Meeting in the City
Hall Council Chambers. The public is welcome to attend in person. The meeting will also be a Virtual
Meeting using WebEx audio/visual conferencing system as an electronic means of communication. See
participation information below to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Planning Commission Meeting of May 16, 2022
Dial: 1-408-418-9388
Event number/Access code: 2347 120 3505
Event password: DoverPC
Event Address: https://bit.ly/PCMeeting5162022
If you are new to WebEx get the app now at https://www.webex.com/ to be ready when the
meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-
7196.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
ADOPTION OF AGENDA
APPROVAL OF MINUTES
1. Adoption of the Minutes of April 18, 2022
COMMUNICATIONS & REPORTS
1
Page 2
PLANNING COMMISSION - May 16, 2022 PAGE 2
Meeting Reminder: The next Planning Commission regular meeting date is June 21, 2022 at 7:00
pm.
Update on City Council Actions
Department of Planning & Inspections Updates
OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS
OLD BUSINESS
Request Extension of Planning Commission Approval: None
Update on Revisions to Applications
2. S-19-13 Office Building at 223 and 225 West Division Street - Update to Planning
Commission on Design Revisions to Site Development Plan Application S-19-13 Lands of
NCALL at 223 & 225 West Division Street. This Application and Lot Consolidation Plan
Application was initially approved for the construction a three-story 7,671 SF office building
together with associated site improvements. The subject properties to be combined total
5,120 feet and are located north side of West Division Street east of North New Street. The
property is zoned C-1A (Limited Commercial Zone). The owner of record is NCALL, Inc.
Property Addresses: 223 West Division Street and 225 West Division Street. Tax Parcels:
ED-05-076.08-05-28.00-000 and ED-05-076.08-05-29.00-000. Council District 4. This
application received conditional approval by the Planning Commission in July 2019 and a 1-
year extension of approval in June 2021.
NEW APPLICATIONS
3. S-22-06 New Courthouse at South Governors Avenue and West Water Street – Public
Hearing and Review of a Site Development Plan Application, associated Lot Consolidation
Plan, and Architectural Review Certification to permit the construction of a five-story
106,711 GFA government building to serve as the new Kent County Family Court. The
proposal includes a five-story Parking Structure (425 vehicle parking spaces), parking lot,
and other site improvements. The Site presently consists of a series of eleven (11) parcels
consisting of a total of 3.7499 +/- acres and an alley. The properties are zoned IO
(Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection
Overlay Zone), as well as the H (Historic District Zone). The properties are located on the
east side of South Governors Avenue between West Water Street and Bank Lane. The
owner of record/ equitable owner is the State of Delaware. Property Addresses: 401, 411,
429, 435, 439, 441, and 447 S. Governors Avenue; 101 and 117 West Water Street; 123
Bank Lane; and part of 34 The Green. Tax Parcels: ED-05-077.09-03-32.00-000, ED-05-
077.09-03-33.00-000, ED-05-077.09-03-35.00-000, ED-05-077.09-03-36.00-000, ED-05-
077.09-03-37.00-000, ED-05-077.09-03-48.00-000, ED-05-077.09-03-50.00-000, ED-05-
077.09-03-53.00-000, ED-05-077.09-03-52.00-000, ED-05-077.09-03-61.00-000, and an
alley. Future Addresses: 415 S. Governors Avenue (Parking Garage), and 445 S. Governors
Avenue (Courthouse). Council District 4. Project Site is subject to the Architectural
Review Certification Application HI-22-03 as reviewed and recommended at the April 21,
2022 meeting of the Historic District Commission. For Consideration: Architectural
2
Page 3
PLANNING COMMISSION - May 16, 2022 PAGE 3
Review Certification, Tree Mitigation Plan. Waiver Request: Alternative Size of Loading
Spaces.
4. S-22-07 Parking Lot at 446 South Governors Avenue – Public Hearing and Review of a
Site Development Plan Application to permit the construction of a 45-vehicle parking lot to
serve the proposed Kent County Family Court. This parking lot is in addition to the
proposed parking garage facility proposed for the Kent County Family Courthouse. The
Site consists of a parcel of land consisting of a total of 0.4989 +/- acres. The property is
zoned C-2A (Limited Central Commercial Zone) and subject to the SWPOZ (Source Water
Protection Overlay Zone). The property is located on the west side of South Governors
Avenue, north of West Water Street. The owner of record is the State of Delaware. Property
Address: 446 S. Governors Avenue. Tax Parcel: ED-05-077.09-03-21.00-000. Council
District 4. Project Site is associated with Site Development Plan Application S-22-06 New
Family Courthouse at S. Governors Ave and W. Water Street.
NEW BUSINESS
5. Update on Dover Air Force Base Compatible Use Study
https://deldot.gov/projects/Studies/dafb/
Public Workshop on May 17, 2022 held at DelDOT Administration Building, South
Entrance - Delaware Room and Virtually on Zoom, 5:30pm - 7:30pm
ADJOURN
Posted Agenda: May 6, 2022
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
3
Page 4
Item 1.
CITY OF DOVER PLANNING COMMISSION
APRIL 18, 2022
The Meeting of the City of Dover Planning Commission was held on Monday, April 18, 2022 at
7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system WebEx.
The Meeting Session was conducted with Chair Mrs. Maucher presiding. Members present were
Mr. Cooper, Mr. Roach (virtual), Mrs. Denney, Mr. Hartman, Mr. Baldwin, Mrs. Malone
(virtual) and Mrs. Maucher. Dr. Jones and Mrs. Welsh were absent.
Staff members present were Mrs. Dawn Melson-Williams, Mr. Julian Swierczek, and Ms.
Samantha Bulkilvish. Also present were Mr. Eric Dowell, Mr. Chris Lazenby, Mr. Brett Jarett,
Ms. LeeAnn Gudorp, Mr. Steve Schmidt, Mr. Jonathan Street and Mr. Michael Riemann.
Speaking from the public were Mr. William Garfinkel, Mr. David Casto, Mr. Derek Headley,
Mr. Mark Reaves, and Mr. Chris Moore.
APPROVAL OF AGENDA
Mr. Baldwin moved to approve the Agenda as submitted, seconded by Mr. Hartman and the
motion was unanimously carried 7-0 with Dr. Jones and Mrs. Welsh absent.
APPROVAL OF MEETING MINUTES OF MARCH 21, 2022
Mrs. Denney moved to approve the Planning Commission Meeting Minutes of March 21, 2022,
seconded by Mr. Baldwin and the motion was unanimously carried 7-0 with Dr. Jones and Mrs.
Welsh absent.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on March 28 & 29, 2022 and April 11 & 12, 2022.
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, May 16, 2022 at 7:00PM in the City Hall Council Chambers. We will continue to
provide an opportunity for virtual participation as well.
Mrs. Melson-Williams stated that she currently continues as the Interim City Planner and is
busier than ever. Our office is probably going to be a little bit more swamped as she is sad and
happy to report at the same time that this is Ms. Bulkilvish’s last Planning Commission meeting
this evening as a member of the Planning Staff. She is continuing her career at the Office of State
Planning Coordination so you might see her name on some letters in the future. We wish
Samantha all the best and the rest of us, until we get her position filled, will be very busy to say
the least. This is a great time to be in Dover. We are currently in the middle of Spring Cleanup
Week. The Public Works Office gives some opportunity for people to dispose of certain items
and if you need more information on that, see the City’s website about how they conduct the
pickup of those bulk items during Spring Cleanup Week. NASCAR will be back in town next
weekend; it is a fairly early NASCAR Race for Dover. The following weekend, Dover Days is
on May 7, 2022. Related to both of those, Staff has various responsibilities but there are good
things to be doing here outside in Dover.
1
4
Page 5
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the WebEx system.
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval: None
2) Pending Development Application
S-22-01 Caliber Car Wash at 280 Cowgill Street – Continued Review of a Site Development
Plan Application for the construction of a 3,500 SF Self-Service Car Wash facility and
associated site improvements including two (2) pay stations and nineteen (19) vacuum spaces.
This redevelopment includes demolition of the existing auto repair shop building. The property is
zoned C-4 (Highway Commercial Zone). The property consists of 0.78 acres (33,976.8 SF) and
is located on the south side of Cowgill Street and Court Street near the corner of Martin Luther
King Jr. Boulevard and S. DuPont Highway. The owner of record is Neaton’s Tire Service of
Delaware. The Equitable Owner (Developer) is MPV Properties c/o John Bradley Murr. Property
Address: 280 Cowgill Street. Tax Parcel Number: ED-05-077.10-01-17.00-000. Council District
4. Waiver Request - Elimination of Sidewalk on Street Frontages for Alternative. This
application was heard at the February 22, 2022 Meeting of the Planning Commission where a
public hearing was held and the action on the application was deffered.
Representatives: Mr. Eric Dowell, MPV Properties; Mr. Chris Lazenby, Timmons Group; Mr.
Brett Jarett, MPV Properties; Ms. LeeAnn Gudorp, Timmons Group; Mr. Steve Schmidt,
Timmons Group (all participating virtually)
Mr. Hartman motioned to lift S-22-01 Caliber Car Wash at 280 Cowgill Street from the table to
continue its review, seconded by Mr. Baldwin and the motion was carried 7-0 by voice vote with
Dr. Jones and Mrs. Welsh absent.
Ms. Bulkilvish stated that the application was tabled at our February 22, 2022 meeting due to the
concerns regarding traffic in this area. This application is for a 3,500 SF Car Wash facility with
nineteen (19) vacuum stations. It has a few entrances. The one directly for the Car Wash itself
would take the person driving in through the pay lane and then through the Car Wash where they
would exit into the vacuum station area. The other entrance would be pretty strictly for the
employees so that they could access employee parking. There is also one additional exit which
would be the bailout lane in case someone had gone through the Car Wash lane and maybe
forgotten their wallet or something like that. The applicant is also asking for a Waiver for the
frontage sidewalk. They are proposing a sidewalk connection from the existing multi-use path
along Martin Luther King Jr Boulevard onto the site. Again, returning to the traffic situation, the
applicant has invited her to several meetings with DelDOT. First was their Project Coordination
Meeting on March 28, 2022. At that meeting, the applicant was made aware by DelDOT that this
intersection at Martin Luther King Jr Boulevard and United Way, which is where the Wawa is, is
a high hazardous intersection and has been identified as so. They had just completed a
Conceptual Plan for the intersection, but DelDOT also informed us that the Concept Plan is just a
2
5
Page 6
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
concept. They weren’t willing to share a drawing of the concept because that is how early it is in
the planning stage. It hasn’t even gotten on the list for funding and that could be 15-20 years out.
DelDOT also expressed to the applicant that there may be some intermediate projects in the area
that they could assist with to assist with the flow of traffic in that area and to lessen the hazard.
That was further discussed on April 11, 2022 at the Pre-Submittal Meeting and she thinks that
the applicant has a better understanding of what is expected from DelDOT from them. She is not
going to say that it is completely clear because she is still a little lost even. They are diligently
working with DelDOT and they will need DelDOT approval before any Final Plan Approval is
accepted.
Ms. Gudorp stated that following up with what Ms. Bulkilvish has given in the summary, she is
exactly right. They have been meeting with DelDOT and trying to work through their process in
understanding the improvements. She introduced Mr. Steve Schmidt from their team, as he is
their Traffic Engineer. He is available for any questions or concerns. She asked Mr. Schmidt to
give a brief update on the Pre-Submittal Meeting that happened on April 11, 2022.
Mr. Schmidt stated that during the meeting, there were a couple things that they were working
with DelDOT on and waiting on. One of those is the requirement for a Traffic Impact Analysis.
They are going to be a part of an area-wide study which means that they will contribute some
funds towards the study of the entire area. This one development alone is not the source of the
traffic in this area nor the solution either. So, they will pay into a fund to help with that area-wide
study. We do not know the amount of that yet, DelDOT is working behind the scenes to get them
that number. As Ms. Bulkilvish mentioned, this intersection is slated for further study and
potentially future improvements by DelDOT. But we do not know what those improvements are
at this point and they are years out from a funding standpoint. With that said, DelDOT has
informed them that they will be expected to contribute some amount of money towards those
improvements as well. That is another thing that is forthcoming from DelDOT; they don’t know
that number yet. But they are actively working with DelDOT and with Ms. Bulkilvish on these
issues; and they will continue to do so. They will not be able to get our access until they have full
approval from DelDOT; so, it is a process that they are actively working through.
Ms. Gudorp stated that they have Mr. Jarett and Mr. Dowell from MPV Properties present if
there is anything else that they want to add.
Mr. Hartman stated that in the Memo from the Planning Office from April 8, 2022, it is
mentioned that the project can be considered for conditional Site Plan approval by the Planning
Commission. Does a conditional Site Plan approval provide any further assurances than the fact
that DelDOT approval is needed for the Final Plan Approval? Responding to Mr. Hartman, Mrs.
Melson-Williams stated that using the term “conditional Site Plan approval,” that is typically the
type of approval that is granted by this body. You grant approval to a Site Plan conditioned upon
the Development Advisory Committee Comments and getting the various agency technical
approvals. It is different from a Conditional Use. It is an approval that is granted upon conditions
being met.
Mrs. Maucher stated that the public hearing for this application was previously held at the
Planning Commission meeting of February 22, 2022.
3
6
Page 7
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
Mr. Hartman moved to approve S-22-01 Caliber Car Wash at 280 Cowgill Street acknowledging
that the development plan cannot move forward with the Final Plan Approval until DelDOT has
given its approval and to also approve the Waiver Request for the elimination of sidewalk on
street frontages for an alternative based on the fact that there is multi-modal sidewalk that runs
by the facility, seconded by Mr. Baldwin and the motion was carried 5-2 by roll call vote with
Dr. Jones and Mrs. Welsh absent. Mr. Hartman voting yes; based on the reasons stated in the
motion and the fact that they just need to place their faith in DelDOT to do their job. Mr.
Baldwin voting yes; keeping in mind that this is depending on DelDOT’s decision on approval of
the traffic study. Mrs. Malone voting no; for her its the same concerns of when it was brought to
the Commission previously and she apologizes to Staff because she does see where they are
satisfied but that intersection area is extremely dangerous, and she is still concerned with cars
being parked down the road waiting to get in the Car Wash. Mr. Cooper voting yes; for the
reasons stated in the motion. Mr. Roach voting yes; for the reasons previously stated. He also
has concerns but trusts Staff and would like to see the DelDOT Report on this application. Mrs.
Denney voting no; she feels very strongly in agreeance with what Mrs. Malone just said with the
same identical comments that were made at the last meeting. This is such a highly dangerous
intersection and anybody who comes and goes from Wawa would realize that. It is not just the
cars around them; it is also a lot of pedestrian traffic there and somebody swerves and somebody
dies. She feels very strongly that there needs to be something different done before anything goes
in there that is going to have traffic coming and going so closely or directly across from the
entrance of that Wawa. Mrs. Maucher voting yes; she thinks that the applicant has worked
diligently with DelDOT, and it sounds as if there will be some interim measures to somewhat
improve the safety of the area until DelDOT comes through with its final plan.
NEW APPLICATIONS
SB-22-03 Lands of Bayroadcap, LLC at 600 Bay Road: Minor Subdivision Plan – Public Hearing
and Review of a Minor Subdivision Plan for the two (2) existing Lots of the overall 12.9366 +/-
acre Landing Square Commercial Development on Bay Road. The Plan proposes to subdivide the
larger of the Lots (with direct frontage on Bay Road) into two (2) new Lots identified as Lots 2
and 3. The Plan also notes a Minor Lot Line Adjustment between Lot 1 and the proposed Lot 2.
Lot 1 is proposed to be 4.8365+/- acres and is to the rear (west) of the overall site. Lot 2 is proposed
to be 4.7580+/- acres fronting on Bay Road in the northern portion of the site. Lot 3 is proposed
to be 3.3421+/- acres fronting Bay Road in the southeastern portion of the Site. The subject site is
located on the west side of Bay Road near its intersection with Blue Hen Boulevard and the Bay
Court Plaza entrance drive. The property is zoned C-4 (Highway Commercial Zone). The owners
of record are Bayroadcap Phase 1, LLC and Bayroadcap, LLC. Property Address (both Lots): 600
Bay Road. Tax Parcel Numbers: ED-05-077.00-01-09.00-000, ED-05-077.00-01-09.01-000.
Council District 2. This site was most recently subject to Minor Subdivision Plan SB-21-01 which
subdivided the Lot into two (2) parcels as approved by the Planning Commission on March 15,
2021. Application S-19-20 Delaware State Police Building Update at Bay Road Commercial
approved by the Planning Commission in September 2019 received Final Plan Approval on March
6, 2020, regarding the development of the Lot 1 (Phase 1) area superseding Application S-17-20.
Application C-20-02 Landing Square: Revised Phase 2 Area approved by the Planning
Commission in August 2020 received Final Plan Approval on February 25, 2021, for the
4
7
Page 8
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
commercial development of the Lot 2 area.
Representatives: Mr. Jonathan Street, Becker Morgan Group
Mrs. Melson-Williams stated that this is a Minor Subdivision Plan for a property at 600 Bay Road.
The property has been before us multiple times over the years with various development
applications. The most recent was a Minor Subdivision that divided the tract of land into two lots,
being Lot 1 and then Lot 2 as the residual in the eastern portion of the property. Tonight, we are
looking to ultimately come up with a plan that consists of three lots. The property is zoned C-4
(Highway Commercial Zone) so the lots are required to be in compliance with the provisions of
the C-4 (Highway Commercial Zone). With this project, the Lot 1 area is the westernmost portion
of the property shown at the bottom of the screen. That area was developed with the Phase I Plan
for an existing office building as Plan S-19-20. The Delaware State Police and associated agencies
occupy that space. Lot 2 with the new plan, would consist of kindof the northern portion of the
property shown on the screen to the left. There is an office building that is currently under
construction that was approved most recently under C-20-02 Revised Plan. The balance of Lot 3
would be the southern corner of the property. There are proposals for development in that Phase
III area on Lot 3 that were previously approved for a restaurant and parking areas there. Lot 2
additionally has a restaurant site closer to Bay Road. This evening, this is all about what she calls
the “invisible lines.” It basically creates lots that are in the case of Lot 1 at about 4.8 acres, Lot 2
at about 4.7 acres, and Lot 3 at about 3.13 acres. The Plan Review involves checking the placement
of the property lines for compliance of the C-4 (Highway Commercial Zone) setbacks. They need
a little bit more information that the applicant can provide to confirm that the setbacks are met for
that Building that is currently proposed under construction. The Lot 1 Building appears to comply.
Overall for this site being divided up into multiple lots, there certainly will need to be a series of
easements; some of which already exist but will need to be augmented to reflect that all three lots
are a party to them. Those include cross access, drainage and other utility easements that will be
necessary to ensure that all three properties work together because in some cases they share
entrances to get onto the site and stormwater management areas for example. Any development
activities are going to be subject to the approved Site Plans or Conditional Use Site Plans that are
in place for the project unless a Revised Plan comes forward in the future. Planning Staff notes
that this does qualify for a Minor Subdivision Application process which means one trip to the
Planning Commission and subject to public hearing tonight. They have noted a number of
corrections to the Plan just to clarify some things. Likewise from the other agencies, their
comments are very similar to ours in that there are some corrections that need to be made to ensure
that appropriate easements are documented on the Plan for the collection of the three properties.
There are no changes to their proposed entrance locations. This is really to divide the tract into
three parcels. There are no special waivers to consider this evening. She will note that Lot 1
previously received a Waiver to allow for creation of a Lot with no frontage on a public street. It
does have by easement, access to a public street by use of the Bay Court entrance drive and other
cross access easements crossing what are the proposed Lot 2 and Lot 3 areas.
Mr. Street stated that this one is like one of his children; it seems to follow him for the past couple
years. Similar to what was previously subdivided into two lots; this is the same scenario. For those
of you who were here previously, they are doing it for financial reasons so that the financing of
the buildings currently under construction can be kind of closed out and converted to the long term
5
8
Page 9
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
financing that they have for the project. They did the same thing for the State Police Building and
we are back here now with the Government Services Building which is the building that is
currently under construction. That third lot will be held. Like Mrs. Melson-Williams stated, there
is a parcel kind of in the front of Bay Road that has a planned restaurant that has yet to materialize
but that third parcel can then be free to go back to financing for construction as well. We don’t
have any concern or problems with Staff’s Report. In fact, the previous easements that were
recorded with the previous Subdivision frankly cover majority, if not all of the concerns or requests
coming out of KCD or Staff. He thinks that they are going to have to modify the cross access
easement that is currently shown on the plan but other than that, they don’t have any comments or
concerns.
Mrs. Maucher opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mrs. Denney moved to approve SB-22-03 Lands of Bayroadcap, LLC at 600 Bay Road: Minor
Subdivision Plan. In reviewing this, she thinks that it meets the criteria and works well with the
Comprehensive Plan as well as just generally what needs to happen to develop this piece of
property, seconded by Mr. Baldwin and the motion was carried 7-0 by roll call vote with Dr. Jones
and Mrs. Welsh absent. Mrs. Denney voting yes; based on her motion. She thinks that this fits
nicely into the plan. Mr. Hartman voting yes; based on the proposal not impede the development
of the site and the access easements seem to be addressed. Mr. Baldwin voting yes; for the
aforementioned statements. Mrs. Malone voting yes; for reasons stated. Mr. Cooper voting yes;
for all of the reasons stated during the motion. Mr. Roach voting yes; for reasons previously stated.
Mrs. Maucher voting yes; for reasons previously stated.
S-21-11 McKee Road Apartments at 1385 McKee Road – Public Hearing and Review of a Site
Development Application for the construction of sixteen (16) 10,000 SF garden style apartment
buildings each containing twenty-four (24) units for a total of 384 apartment units. Also
proposed are sixteen (16) garage buildings, a Club House with Pool, walking paths, picnic areas,
a dog park, playing field, parking, and other site improvements. The property is zoned RG- 2
(General Residence Zone) and C-2A (Limited Central Commercial Zone) and subject to the
COZ-1 (Corridor Overlay Zone). This development application is only for the residential zoned
portion of the property. The commercial portion will be developed under separate application.
The property is located on the east side of McKee Road near the intersection of McKee Road and
Scarborough Road. The owner of record is McKee Cap, LLC. Property Address: 1385 McKee
Road. Tax Parcel: ED-05-067.00-02-57.00-000. Council District 4. Review of Active Recreation
Area Plan with Consideration of Fee-in-lieu of Active Recreation Area Construction. Waiver
Requests: Partial Elimination of Upright Curbing, Reduction of Required Parking, and the
Elimination of Sidewalk along the Public Street Frontage.
Representatives: Mr. Jonathan Street, Becker Morgan Group; Mr. Michael Rieman, Becker
Morgan Group
Mrs. Bulkilvish stated that this application originally came to the Commission in November
2021 and was pulled prior to the meeting for some concerns regarding the rear access which at
the time, the applicant was asking for a waiver from. In the meantime, they have provided the
6
9
Page 10
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
rear access for the apartment buildings and have updated the Parks & Recreation Plan. They are
now proposing the same number of apartment units; 384 apartment units including sixteen (16)
apartment buildings and sixteen (16) garages which will house five (5) cars each, a Clubhouse
with a pool and separate parking area, a dog park, a 28,000 SF turf field, walking trails that
amount to 20,275 SF of Active Recreation Area and seven (7) picnic areas each 1,900 SF which
would contain approximately two (2) picnic tables. As Mrs. Melson-Williams mentioned earlier
in the meeting, this Parks & Recreation Plan had gone to the Parks & Recreation Committee
earlier this month and they were agreeable to plan and the Cash-in-Lieu which was calculated to
be $15,561. That is just for the deficit of Active Recreation Area that has not been provided.
When a residential development is proposed, the recreation area equates to 275 SF per dwelling
unit. They asked for the applicant to provide an appraisal of the land to equate the value of the
Parks & Recreation Area needed and then that is how we calculate the deficit and then the Cash-
in-Lieu amount. This could possibly change depending on the applicant’s application and if any
changes were to be made through this process. So that Cash-in-Lieu amount is the minimum for
what could be. They are also asking for several waivers. Again, they are providing rear access
now so that is not one of the waivers. They are asking of a partial elimination of upright curbing.
There are a lot of wetlands in the area and they are proposing some grassy areas, especially
between the parking areas and the backs of the apartment buildings themselves to allow for some
sheet flow. They are asking for a reduction in the parking requirement. They want to provide 768
spaces and by our calculations, they would have to provide 864 spaces. The last waiver is a
partial elimination of sidewalk along frontage. They are providing sidewalk along the entrance
drive to the property which will be in the commercial area in front of the property and she
believes that they are agreeable to expanding with that some along the frontage. They will not be
providing sidewalk along the entire frontage of McKee Road as a lot of it is ditch and they have
to do a lot of building up of the land there to accommodate that. There is; however, an existing
multi-use path on the opposite side of McKee Road that they are looking to provide pedestrian
connection to.
Mr. Street stated to orient those who weren’t here previously; the tract of land is on the east side
of McKee Road, essentially right across the street from the Emerald Pointe subdivision on the
south side. The north side would be the intersection of the Norfolk Southern Railroad and the
overpass on Scarborough Road. With that entire tract of land, if you are traveling north on
Scarborough Road, the property would be off to your right. As Ms. Bulkilvish discussed, this
came back starting the spring of 2020 with the Annexation and the Rezoning of the tract of land.
This has been surrounded by City property and it was a targeted piece of property that we
annexed into the City in June 2020. It is a split-zoned parcel. The residential portion is RG-2
(General Residence Zone) with a commercial component to the land itself that is not part of this
application as of right now. Back in November 2020, a Traffic Impact Study was completed and
approved with DelDOT which then they were going to come in for Planning Commission
approval. They then held a community meeting in September 2021 just to kind of update the
community and to hear some of their concerns and to discuss the plan itself. The Plan also went
before PLUS Review in September 2021. It was slated to come to Planning Commission in
October 2021 but the Fire Marshal had some concerns about rear access. To really bring the Plan
together, they decided to pull it and put it on hold while they worked through the issues with the
Fire Marshal. Like Ms. Bulkilvish said, last week they went before the Parks and Recreation
Committee. The presented their plan and got a favorable recommendation from them as well and
7
10
Page 11
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
now we are here for conditional plan approval. The Plan on the screen shows that there are
sixteen apartment buildings and the interconnection of the parking and the access and the
Clubhouse located in the front along McKee Road. This is the same Plan that was presented in
June with just some minor tweaks here and there.
The next plan shows some of the intersection improvements. The results of the TIS from
DelDOT call for the signalization of this intersection, the design of the designated left turns into
both our community and Emerald Pointe across the street, designated right hand turns into the
apartment complex as well as a bike lane and a shoulder improvements on the east side of the
road itself. It should be noted that with the approval of the TIS, that the developer is required to
enter into signal agreements and provide a financial contributions to at least two other
intersections. The first one is going to be the intersection just south of us which is McKee Road
and College Road. There is an active project there or there will be an active project there where
they are going to be contributing money for an additional right hand turn at that intersection.
There will be some intersection improvements there as well as all the way down closer into town
at the intersection of Forrest Street and McKee Road. He believes that DelDOT has a project
going on at that intersection and they will be making some contributions to that project as well.
The next couple of slides are going to be examples of some of the architecture. These are current
projects that the developer has under construction right now in Middletown. They will be similar
colors and similar architecture. They have some stone with some vertical board and batten style
siding with some metal roofs on portions of it along with some asphalt shingles. The next slide
shows a building that is slightly larger than the previous building, but the same style of
architecture: stone siding, board and batten siding, and standing seam roofs. These are examples
of the interiors with high-end finishes in the sitting rooms and kitchens. This builder prides itself
in retention of the leasees. They would rather have a leasee stay then turn this over; so, they like
to provide nice high-end finishes for them to keep them. The next slide shows an example of the
garages. There is a garage for each building with five parking spaces. Again, the architecture of
the garages is meant to compliment the buildings themselves and this is the same style
architecture that they are building in Middletown, DE.
The next slide shows the Clubhouse at the Reserve of Weston in Middletown, DE. The Staff
Report mentioned that they did not provide architecturals for the Clubhouse itself. This is
essentially the Clubhouse that they will be building with a standing seam type roof mixed with
some asphalt shingles, board and batten style siding and a normal horizontal style siding to break
up that building so that it is not just one monolific side. Some of the amenities in the Clubhouse
will be a leasing office, fitness center, multimedia rooms, lounge areas, coffee bar, fireside
lounge, pool table and a library. The next slide is an example of the rear of the building, the part
with the pool deck that they will be providing. The next slide shows the opposite view of the
deck with some lounge chairs, picnic tables and umbrellas. The next slide shows some examples
of the interior and the amenities of that Clubhouse has with couches and chairs for people to
gather.
The next slide is the Staff Report and they don’t have any real concerns with the Staff Report
itself but he will take one exception to that. The Staff Report does mention the Parks & Rec
Report. Parks & Rec Committee gave us a favorable recommendation and in that meeting, they
8
11
Page 12
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
were talking about suggestions that Staff had made in that Report. He knows that Staff
sometimes puts things in reports that allow flexibility within that report and he just wants to
confirm that they had talked about three specific things: a shade structure for the playing fields,
playground equipment and exercise equipment along the multi-modal paths that are throughout
the site itself. They had discussed with the Parks & Recreation Committee that the clientele or
the leasees that the developers is marketing towards is a young and professional age group. They
are not marketing towards a family structure and for them to provide a playground wouldn’t be
feasible. An official and a large proportion of the leasees would need to be family oriented which
they are not marketing that. They are about 90% in agreement with the Report and they are going
to be providing mostly everything that they have mentioned in the Report. For the shade
structure, again, and as long as these are recommendations and not requirements of the plan.
They really intend on providing more shade for that large turf field in the upper northern
quadrant of the site. It is a large empty field for them to do what they need to do. They really
want to hit that more with trees and more natural shading. The last one was the exercise
equipment along the path. Those just become more maintenance and a liability issue for the
owner and the grounds. Again, as long as these are just suggestions and not necessarily
requirements of the plan, then they are okay with working with Staff.
Lastly, the application in front of you is for 384 market rate apartments and it is in compliance
with the Comprehensive Plan. They have garages at each building. One of the things that Staff
did mention was the electric vehicle charging stations and he is happy to report that they will be
providing at minimum, a pair of charging stations for a pair of buildings or a charging station per
building with the ability to expand if needed. Bicycle and multi-modal connections and paths
throughout the development will be provided as well as entrance signal and pedestrian
improvements across the front. He would be remiss to not mention the waivers that we have
requested. Ms. Bulkilvish talked about partial elimination of upright curbing that is more for
stormwater management. The parking reduction is mentioned in the Report as more of an overall
parking number. This is really parking per building. He thinks that Code requires 54 spaces per
building and they are requesting a reduction to 45 spaces per building which gets us to that
overall number. Industry standard is about two spaces per unit and the City’s Code requires 2.25
spaces per unit. So that is the reason for the reduction itself. The last waiver request is for the
elimination of the frontage sidewalk or more to a partial elimination of the frontage sidewalk.
This is an Investment Level 1 in State Strategies in the area for DelDOT. He can’t think of an
instance where he has been part of a project where they will waive a sidewalk across a frontage.
In the DAC Meetings and his communications with Staff previously, they have talked about
providing multi-modal frontage sidewalk from essentially our entrance to what they believe is
the most logical connection which is a traffic light at the intersection of McKee Road. They
believe that DelDOT will still require that anyway. What they are requesting is partial
elimination of that sidewalk frontage with the extension from that light to the bridge. There are
no pedestrian facilities across that bridge on that side of the road and to do a mid-block crossing
in that area would be more of a safety concern. They are still asking for partial elimination of
that sidewalk but it’s really from that traffic light to the bridge.
Mr. Hartman stated that after his initial review of the packet, he was pretty much against the
waivers for parking, sidewalk and the recreation area. He has many concerns and this may take
more than five minutes to get through this. He does want to start off with a concern not related to
9
12
Page 13
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
the waivers. It is mentioned in the Fire Marshal’s review that there was an agreement and for
public record, could you talk about the agreement for rear access? Responding to Mr. Hartman,
Mr. Street stated that with the City’s Ordinance regarding rear access for multi-story buildings,
there are two sides to every story. We say it’s a little unclear as to its complete definition of the
percentage of coverage. The Fire Marshal was basically invoking 100% coverage which they
wanted either a fire lane or a paved road to run along the backs of the buildings or the Code
allows for an 8-inch section of stone covered with soil. It is demarked by signs and landscaping
and such. We went back and forth talking to the Fire Marshal about what they would like to do
and what the Fire Marshal will agree to. Essentially the Code is kind of ambiguous as to how
much coverage is actually required. They are going to 50% of the building; essentially, the whole
half of the rear of the building will be covered by an 18 foot wide secondary type what he calls a
“fire lane” but it is a turf trail. It will be an 8 inch section of stone which can support fire
apparatus covered with 4 inches of top soil. That access will be provided and that was the follow-
up discussions that they were having.
Mr. Hartman stated that he would like to start with the fee in lieu for the Active Recreation Area.
The determination in the Zoning Ordinance, Article 5Section 10.17 determines for suitability of
a cash donation if the Commission determines that the construction of the recreation is not
practical due to close proximity to existing available recreation facilities or are infeasible due to
natural characteristics of the land that will not benefit the residents of the development, then a
cash-in-lieu is considered. He couldn’t find anywhere where those concerns were addressed in
your application. Is there a proximity to an existing recreation facility or is it infeasible due to the
natural characteristics of the land? Responding to Mr. Hartman, Mr. Street stated that he lives
about a mile from this site and travels Scarborough Road and McKee Road two or three times a
day. There is a multi-modal trail on McKee Road and then Scarborough Road on the west side
and that carries up into Del-Tech. They have a large track around Del-Tech and that is frequently
used. So, that is proximity to some existing features. When you talk about impingement on the
land and the land is not available. This is a huge site of 70 some acres and if you look at the plan
that is up right now, that shaded area is all wetlands. So this site is encumbered by wetlands and
trees. What they have tried to do with this development is really not impact that at all or as little
as we possibly can. They have provided about as much as we can in the open space areas that are
available to us so that we are not further impacting buffers or trees. We are leaving a large band
of trees right in the center of everything. Again, it is more of a visual buffer than anything else
and the areas that you don’t see is that they have to provide stormwater for this whole facility. So
instead of providing a large stormwater pond which you see all the time, they are trying to go the
route of breaking it up into smaller pieces with less impact. They will have more outfalls to
minimize the impact to the wetland areas which are essentially draining across those railroad
tracks. The fee-in-lieu just seemed to make sense because we are going to start impacting on
natural wetlands, the trees and the like; so, they just decided to apply for the fee-in-lieu.
Mr. Hartman stated that eliminating two or three buildings themselves would allow you to
provide active recreation space. Responding to Mr. Hartman, Mr. Street stated to counter that,
one of the biggest concerns of this area from the neighbors has been traffic and the signal. Again,
they went through a TIS back in November and it has been approved through DelDOT. The
signalization of this intersection actually can’t happen until the full buildout of all of the
apartments are done. The site wouldn’t generate enough traffic to then warrant a signal and that
10
13
Page 14
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
is controlled by DelDOT. So sure, we can take out half of this and provide all of the active
recreation area but then we would be left with an intersection and an entrance. They are frankly
forbidden to provide an entrance along any other piece of this property but across from Emerald
Pointe. It would then negate the warrants for the signal itself. So then you are combating with
providing 100% of the active recreation area but then he thinks that they are addressing bigger
concerns which is traffic and the signalization of that intersection.
Mr. Hartman stated that that makes some sense to him. Also in the Report, there is mention of
like three levels of recreational land that is provided. He sees that the biggest level was
mentioned by the Planner this evening and the other levels are like in your letter; are those now
off the board? It states that you are providing roughly 41,400 SF of recreation. Responding to
Mr. Hartman, Mr. Street stated that is combined with the walking trail square footage, the turf
field square footage, and the seven picnic areas. We are still providing all of that and he doesn’t
know the square footage of it all.
Mr. Hartman stated that he thinks that it could have been a little clearer. It says it leaves a
balance of 64,200 SF. Responding to Mr. Hartman, Mr. Street stated that he thinks that number
is incorrect because they are not 64,200 SF shy.
Ms. Bulkilvish asked Mr. Hartman which Report he was looking at. Responding to Ms.
Bulkilvish, Mr. Hartman stated that on the drawing provided to the Commission, Sheet C-001
and it was a completely different number at the bottom. When he was reviewing this package, he
didn’t know which number to accept.
Mr. Street stated that is something that Staff Report is alluding to as well. As this Plan gets
further developed, if those areas change slightly, that number may change slightly as well. They
could actually increase the amount of sidewalks and that number would then further reduce.
Mr. Hartman stated that it might be clearer for future applications for cash-in-lieu of recreational
area if you actually address what is required, what’s required in the Ordinance, and when it
comes to why it’s needed rather than actually providing recreational area. Otherwise, builders are
going to continue to fill the sites with as many apartment buildings as possible and just think that
the Commission is going to approve that. He wants to draw their attention to the last thing in the
Ordinance which mentions that it will not benefit the residents of the development. He thinks
that the Commission is appointed through our Districts and are here to speak for the people who
aren’t here. He thinks that it is up to us to make a decision without anybody else speaking about
it; is this going to benefit the residents or not? That was his main concern with these reductions
in the recreation space. He does urge them in future applications to provide your reasonings
based on the Ordinance. As long as he is here, he will be questioning those reasons.
Mr. Hartman stated that parking is being reduced by nearly 100 spaces. Each building has 48
parking spaces. You mentioned 45 by he read 48 and that includes the five garages. Responding
to Mr. Hartman, Mr. Street stated yes.
Mr. Hartman questioned if the parking spaces will be marked for each apartment. Responding to
Mr. Hartman, Mr. Street stated that he does not believe that is part of the plan at this point. He
11
14
Page 15
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
doesn’t think that they do that. All of the parking spaces that we provide and there is a great
amount of detail that goes into providing parking for these buildings; so, they aren’t necessarily
marked for each building. They like to hold the parking as close to the buildings as they can and
they try and keep those designated parking spaces for each building directly in front of the
building.
Mr. Riemann stated that he wanted to add a little bit onto the parking discussion. This particular
developer operates thousands of apartment units and has for multiple generations. Parking is a
critical element to that and to the design process. Their goal is to maintain tenants. It is in their
best interest to make sure that the units are full, to make sure that they don’t turn over, and to
make sure that they have tenants that stay there. That is ultimately their goal. Having parking that
is easy to get in that is close to your unit that you can get to quickly is the design objective. We
actually spend a great deal of time through that process ensuring that they meet those
requirements. What they tend to see with all of these projects is about 1.75 to 1.9 parking spaces
per unit is sufficient to meet those design objectives. We are at about 2 spaces per unit and the
Code is 2.25 spaces per unit. The Code is a little more than what we see as necessary. We could
add the additional 100 spots but that is just less active recreation space that they can provide.
That means more stormwater management and more runoff, etc. It is not their objective to
necessarily cut parking out to save costs because they want to make sure it functions for the
longevity of the project. This particular developer keeps these facilities and owns them and they
manage them. So, it is in our best interest to make sure that the parking is adequate and what we
have designed is just that.
Mr. Hartman stated that he did read a lot of that in both the DAC Report and the application. He
is still trying to understand it from a tenant’s point of view. Twenty-four apartments, forty-eight
parking spaces and five of them in the garage. How will these garages get allotted? Is that
something that you pay extra for? Responding to Mr. Hartman, Mr. Riemann stated typically yes.
Mr. Hartman stated that if somebody buys a garage space and has two cars, they can put one car
in the garage and have the other car parked. Responding to Mr. Hartman, Mr. Riemann stated
that could be but you have to keep in mind that the apartments are a mixture of 1 bedroom, 2
bedrooms, and 3 bedrooms. So a lot of 1 bedroom apartments will have one person in the
apartment. It is an average so you are looking across the entire 24 unit building assuming all 24
units have two cars. Like he said, over the thousands of apartments that we have studied, 1.75 to
1.9 is sufficient and we are at about 2.
Mr. Hartman stated that mentioned in the Staff Report, there could be a condition placed that
would require open space maintained for the missing 96 spots in the event that parking is
inadequate. Is that something that Planning Staff thinks should be considered? Responding to
Mr. Hartman, Mrs. Melson-Williams stated that the Zoning Ordinance does allow for the
Planning Commission to require that kind of place holder space where parking could be
constructed for a portion or the amount being reduced. In this case, Planning Staff did not make
that as a recommendation in our review of that waiver request feeling that they are providing a
significant amount of parking on site but this is also a site that is served in other fashions with
public transit in the area. So that likely could reduce some of the parking needs in this day and
age.
12
15
Page 16
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
Mr. Hartman stated that his final concern for the waivers is the sidewalk. The Planning Office
had recommended a multi-modal sidewalk on the east side of McKee Road and the commercial
buildings. What is your reply to that? Responding to Mr. Hartman, Mr. Street stated that is what
he was trying to describe. Across from the Clubhouse itself and then up to the intersection itself,
that is what they are proposing. The sidewalk which is what Staff was asking them to provide on
the frontage from our entrance up through the pool deck and amenity space and then it would
have to dive down into the road itself. They were saying that DelDOT was more than likely
going to require us to build it all the way to the intersection so we are fine with that.
Mrs. Denney stated that her issue is with the parking as well. She feels very strongly that unless
these are all one-bedroom apartments where no guests are allowed, you don’t have enough
parking. The other two issues that she doesn’t love but she can live with them She typically
believes that our Code is exactly that; it is the Code. It is the law and it is not a book of
suggestions. When it comes to certain areas, she can be reasonable as long as we are not setting
precedence that someone can come and say well you let this person have it. She is always very
afraid of doing something that would set precedence but parking issues are parking issues.
Setting aside land in case tends to be a good idea except who manages that. It’s not like there is a
homeowners association that is going to come to you and say parking is horrible. So, she really
thinks that these things need to begin with absolute adequate parking, not just for the residents
but for the guests as well. And while we would hope that more people were going to buy that can
walk and take public transportation. We are leaning towards that a little but on the same token,
people still drive and that is a huge concern for her. The other two things, she can live with but
she doesn’t love them. Responding to Mrs. Denney, Mr. Riemann stated that we are actually
seeing a lot of jurisdictions reduce the requirement. He doesn’t know why the City’s is 2.25 or
what the history was to get to that number. New Castle County just reduced their requirement
from 2.25 to 2. So, 2 is a common requirement in other jurisdictions and he thinks that is the
function of what you are seeing in the industry over time as projects evolve. They do think that
the parking is adequate and they need it to be adequate. They need this to be a place where
people can come home and park in their parking space and go enjoy dinner. It doesn’t do us or
our client any good if that is not the case. We do think it is adequate and that is based on dozens
and dozens of projects that meet this exact same requirement. They do not have those issues
there.
Mrs. Denney asked how many of those projects are in Dover, DE? Responding to Mrs. Denney,
Mr. Riemann stated from this particular client, he doesn’t think any but there is one in Camden
and Middletown, up north and downstate.
Mrs. Denney stated that one of the issues for her tends to be that Dover is different than New
Castle County and it’s extremely different than Sussex County. Many years ago she wrote
something for Delaware Today Magazine and she sometimes feel like Dover was the moat
between the palaces and the playground and we were treated as such in many ways. Again, she
really feels as though for Dover, DE, if they changed the rules and regulations in two other
counties so be it, wonderful for them. She has been doing this for a long time, from town
management to different boards such as this and that. In her opinion, and it’s not just a thought in
her head as she has a lot of experience, she feels as this is absolutely not adequate. She realizes
13
16
Page 17
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
also that 96 parking spots takes up a lot of room. She is not necessarily suggesting that it be all
96 but honestly she just doesn’t feel that it is adequate. The average apartment, if you have two
bedrooms at least one of those should be two; so to her, there should be three. But you have to
come up with a mean and not make them all three. Again, you have guests. The garages are nice
but sometimes you come home and you don’t want to walk across. You just pull up and you have
two other spaces taken. Again, she just feels that there is not adequate parking.
Mr. Cooper stated that of the 24 units in each building, how many of those are going to be one
bedroom, two bedrooms, or three bedrooms? Responding to Mr. Cooper, Mr. Street stated that
he believes that the singles are 30%, doubles are 60% and triples are 10% typically.
Mr. Cooper stated that he tends to understand the parking concern. He doesn’t necessarily have it
when you talk about 2.25 spaces to 2 spaces because that doesn’t seem like a huge drop, but
when you add all of the quarter spaces up, it’s 96 spaces. He also knows that the cooperate world
is looking at the number of desks in their buildings and the number of people that are working
there so he is trying to use the same logic. If you have 100 employees, you don’t need 100 desks
because the number of people who are taking vacation or calling out sick or whatever the case
may be, you can get by with a building that only has 75 desks. So he is kind of trying to run the
same logic between the parking spaces and the desks at the corporate building just to draw a
correlation. He does get it from the developers standpoint, if you don’t have enough parking
spaces, you are not going to keep your tenants and you are not going to get more. There is a part
of him that is hung up on that. It makes logical sense that if two spaces works everywhere else
why wouldn’t two spaces work here. He kind of gets stuck on that but at the same time, he
doesn’t know that Dover has the public transportation that New Castle has or Sussex has. He
certainly doesn’t see the same number of people riding the bus in Dover that he does in New
Castle County. He feels like they are more likely to have two cars per apartment here than you
are in other places but he is also not married to that fact. It is just the fact that he is hung up on it.
He is not sure if there is a compromise between the 2.0 to maybe a 2.1 and that would bring us
up to a larger number of spaces which might help with some of the concerns but it also doesn’t
get too crazy on your side for the economic standpoint because he totally understands that as
well. Responding to Mr. Cooper, Mr. Riemann stated that he thinks that is doable. They can look
at some areas along that main road coming in, not up by the entrance but as you get further in to
the site for maybe some possible street parking. He thinks that they would be open to the option
of holding some areas as well.
Mrs. Denney stated that she just wants to say again, she feels like it doesn’t have to be all 96 but
if you could meet us somewhere in between; she thinks that is helpful.
Mrs. Maucher stated that the Clubhouse has additional parking. Is that in addition to the current
two spaces per apartment? Responding to Mrs. Maucher, Mr. Street stated that the Clubhouse
parking is separate based on the amenity spaces.
Mrs. Maucher stated that it could count as some of the parking needed. One would think that if I
lived there I would walk to the Clubhouse, I would not drive there.
Mrs. Denney stated that she thinks that is reasonable if you have extra parking at the Clubhouse.
14
17
Page 18
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
Let’s say that somebody is having entertainment or something, guests can park there and walk.
That is better yet.
Mrs. Maucher opened a public hearing.
Mr. William Garfinkel – 9 Freedom Drive Dover, DE 19904
Mr. Garfinkel stated that he saw on the graphic that these are three story apartments. But it is
also Overlay Zone 1. He thought that zone only allowed two story buildings. Responding to Mr.
Garfinkel, Mrs. Melson-Williams stated that the property is not fully encumbered by the
Corridor Overlay Zone. There is only a portion of the frontage that is and that is basically the L
entrance drive and then it ends kind of just past the Clubhouse. So the Clubhouse is subject to the
height limitations of the Corridor Overlay Zone, the balance of the property is not.
Mr. Garfinkel stated that the other observation is that if the builders are going to be required to
enhance that road, his suggestion is to have them put in stadium lights to light up that
intersection. McKee Road is incredibly dark and if you don’t light up that intersection with all of
the traffic that is going to come, you are going to have collisions and somebody is going to get
hurt. You have to be able to see to navigate that and if they are going to build it anyway, why not
just put a couple stadium lights up there.
Mr. David Casto – 8 Gregory Court Dover, DE 19904
Mr. Casto stated that his main concern is and you have heard it time and time again is the traffic.
Traffic during peak hours in the morning and the afternoon is really bad. He goes through it all
the time and it takes like three cycles of lights for him to get from The Hamlet to College Road
and it’s like that every day. With the addition of 1,000 more apartments and cars and everything
else that goes into that plus that commercial building as well, is just going to contribute more to
the problem. He has called DelDOT and asked them to look at the timing of the light because the
traffic is on Scarborough Road, not so much on College Road but the light is not in sync to
relieve all of that congestion that backs up to The Hamlet. He hasn’t gotten any response from
DelDOT at all as far as that is concerned. He would hope that something is relieved as far as that
intersection now because it is bad and it is going to get worse. It has gotten worse over all of the
years that he has lived here. He would like to see some improvement by DelDOT at that
intersection and to the lighting before the construction starts because you are not going to have
another light until all of the construction is done. Emerald Pointe is not that far from College
Road and you see the line of traffic from The Hamlet to College Road. You are going to have it
stopped again at Emerald Pointe and it is going to be backed up. You are going to have people
like you see in a lot of places, blocking the intersection trying to get through. It really is a mess if
you have ever traveled that way and he would just like the Commission to look into that.
Mr. Derek Headley – 3 Gemstone Boulevard Dover DE, 19904
Mr. Headley stated that he is probably the one single person who is going to be impacted the
most because he lives right on the corner of Gemstone Boulevard. We have been speaking with
these gentlemen as they mentioned, from 2020 and he doesn’t believe that their concerns have
been totally addressed or heard. As the two gentlemen mentioned, the traffic is horrendous.
Between 8:30AM-9:00AM you can’t even get out of the development. From 3:00PM-4:30PM
coming from Rite Aid all the way down to Emerald Pointe to try to make that left hand turn into
15
18
Page 19
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
the development, you can be waiting there multiple times. There have been multiple accidents at
that corner from people being so impatient trying to turn into that development. This gentleman
here mentioned that he lives maybe 5-10 minutes away and he passes this development all of the
time. If that is true, he doesn’t see how he can say with a straight face that those extra potential
people moving into that area will not have a negative impact not only on the community and
especially his community, Emerald Pointe. How are we going to allow this to continue? We have
110 homes in Emerald Pointe with the average person paying $5,000-$6,000 in property taxes.
There is going to be 384 apartment units built across the street from us. What is the impact that
that is going to have on our property values? What is the source of revenue that the City of
Dover is going to be getting from those 384 apartment units? What is the benefit that it is going
to bring to our community? Has this discussion been made already because we are already
talking about parking and how many parking spaces should be allotted? So is this a done deal
and we are supposed to just be here to give a statement? Have minds already been made up or is
this a serious discussion and conversation on what the community is feeling? He would ask that
the Commission please take these things seriously and understand the impact that it is going to
have on the Emerald Pointe community as well as Dover as a whole.
Mr. Mark Reaves – 10 Tanzanite Court Dover, DE 19904
Mr. Reaves stated that he is the Emerald Pointe HOA President and he would like to speak for a
few of our homeowners and also the community. When this plan was put together, we had a
comprehensive conversation with the developers and builders of this project. Coming to this
meeting tonight, it is clear to him that we don’t have that communication. We don’t have the
information that we should have in order to make some decisions or comments on what is going
on. He didn’t know anything, personally, about the Fire Marshal issue and he didn’t know
anything about the Parks & Recreation issue. We are completely uninformed. We have a
management company and we explained through our management company for our attorney’s
office to be included in everything that is going on in the process of this development and build.
So, he is not really sure why they are not being included but in order for this process to move
forward, he would strongly recommend that the Planning Commission and the City enforce
communication to our community so that we can have something to say in regards to that. With
over 100 houses, this is definitely going to impact all of our homeowners. One thing that is
extremely concerning, the Code is the Code and there is a reason for the Code. If parking is
going to impact people that can’t even be present for this hearing at this time. He completely
agrees with the City enforcing that requirement for parking because it is completely necessary.
And to have an alternative to substitute the parking for holding some space or making
adjustments is going to set a precedence for a number of builders just would potentially just roll
past those requirements. He thinks that the City should stand firm on the parking requirements.
There was mention of the traffic light being placed into effect after the development. That would
significantly deteriorate the traffic in our area. The traffic light should be the primary focus
before you start building. If anyone is familiar with the intersection where we have had three
fatalities happen just by us, having a lane to turn into our development from College Road. There
is a go-around lane that a lot of times people who that may not live in that area aren’t even aware
of that lane. So each time that he pulls up to turn in, he has to look in his rearview mirror for a
substantial amount of time just for the fact that someone may be driving behind me and not see
the other cars that have went around. It could potentially hit the back of his car at speeds of 50-
60 MPH. Who knows what would happen if he gets pushed into the traffic or pushed straight
16
19
Page 20
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
ahead or whatever it is; it is extremely dangerous. If you don’t have that traffic light prior to
starting construction, that is going to significantly deteriorate that intersection because there is no
other opportunity for anyone headed north on that road to move around that traffic. The traffic
light has to be first priority. As far as the recreational space, he understands that they may accept
a fee-in-lieu and he is really not even sure what that is. His experience with Blenheim Homes
that built our neighborhood, either the Parks & Recreation rules are new or they must have paid
to circumvent that particular aspect of the Parks & Recreation requirement because the numbers
that he hears tonight in this conversation do not match how many units we have or how much
active recreation space that we have. It is great that they speak to providing some parks and
recreation space to their development; however, when you mention a fee-in-lieu, it seems to
betray that they can possibly just pay a fee and then eliminate the parks & rec space which could
have a negative impact on the community or whatever they are proposing to build. Everything
sounds nice, a dog park, walks and trails and shade but then it really comes out you are going to
be out there walking around but you are not really going to have shade to stop and do your
exercise if it is summertime. It is just very confusing because the paperwork says one thing and
then one day there could be something else that is different. Which are they really considering?
Is it the true documentation or is it something that was mistakenly added or taken away? It just
goes back to them trying to understand what is really being presented to the Planning
Commission. His suggestion is to have some type of consideration to the true presentation of
what is planned to be proposed here and have that communicated to the individuals that are
going to be sincerely impacted by this build. He is not in opposition to the build; however, he
thinks that there needs to be some clear communication so that the Board can make a clear
decision on what is truly being presented and how that is going to affect the community. One
primary thing that he could definitely say to the Planning Board, if you have influence over it, is
to require that that intersection is managed prior to the beginning of any type of development for
that particular area. Because he doesn’t want to present himself as the President of the HOA and
have to communicate to his fellow homeowners that someone has involved in a tragic accident or
their kids have been involved in a tragic accident because there was a decision made by a Board
to forego a traffic regulating device until after the completion which could theoretically take a
year or more to get that done.
Mr. Chris Moore – 219 Meadow Drive Dover, DE 19904
Mr. Moore typed in the chat “I have nothing more to add at this point, thank you.”
Mrs. Maucher closed the public hearing.
Mr. Hartman stated that he would ask the applicant if they could address the concerns of the
HOA President for Emerald Pointe concerning communications with the neighbors.
Mr. Riemann stated that there were a couple of questions that were asked as well about lighting,
and he will be happy to answer those as well as it relates to the communication. He is a little
disappointed to hear that frankly. They have been at this project since June 2020. They have
presented that this would be an apartment project back then when it was annexed and zoned and
he thinks that they even showed plans that showed the number of units. They have been very
clear about that this whole time and the plan hasn’t really changed. They then held a community
meeting separate from this process and not required by this process so that we could engage
17
20
Page 21
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
feedback. The biggest concern that we got from Emerald Pointe was traffic. They can’t get out of
their development, and we can’t turn left in and can’t turn left out. The solution is a signal; and
whether our project happens or not, a signal there is the solution for them to be able to turn left in
and turn left out of their development. This project allows that to happen and it won’t happen
without this project or some development on this property is what is going to drive that signal.
Mr. Street talked about the timing of that signal. What he was referring to was the fact that we
can’t put the signal in in the beginning; in the first day. Signals go in when DelDOT determines
that they are warranted. They have very strict requirements for when signals are warranted and
they have to meet those warrants. Typically, the project will start construction and then once
DelDOT feels that the signal is warranted, then they will require the installation. They have to
sign an agreement with DelDOT that bines us to do it when they tell us to do it. They have total
control over that. We don’t have a problem putting it in on day one, but they just don’t have the
control. They have to let them tell us when that happens and that is up to them. They are happy
to do it whenever DelDOT says to do it. They have agreed to do that. That signal is going to help
the people of Emerald Pointe get in and out of their development. It’s going to provide a stop and
it’s going to provide safe turning in and out. Lighting will be provided. They have designed
many signals for DelDOT over the years and there is lighting provided at intersections so it will
be lit and it won’t be an issue at all. They do feel that they have engaged the community. He does
think that they spoke at the annexation and that they participated in the community meeting and
again here tonight. He thinks that there has been a lot of communication. The number one
concern that they have gotten is being able to get in and out of Emerald Pointe which is a fair
concern. They think that their project is going to help with that because it is going to cause the
installation of a signal which DelDOT has already agreed to. The other intersection that was
brought up was at McKee and College and there are improvements planned there. They are part
of another project that is already happening. There are improvements planned there and there are
turn lanes. This project is contributing financially to these improvements. There are
improvements happening at Route 8 and Saulsbury Road with this project contributing to those
improvements. So, there are lots of improvements happening along this corridor. As tends to
happen, DelDOT plans these projects out and other projects come along and have to contribute to
those projects financially and help support these projects. This project is certainly contributing
and paying its fair share in helping to mitigate the traffic concerns in the area.
Mr. Hartman stated that in DelDOT’s Report it says the developer should schedule a pre-
submittal meeting to discuss the development with DelDOT Subdivisions. Responding to Mr.
Hartman, Mr. Riemann stated that was very normal. They way the process works with DelDOT
in any land development application, the first step is the Traffic Impact Study. You have what is
called a Scoping Meeting, DelDOT tells you what the scope of the Traffic Study is. We do the
study which is an 8 month process, which is what they have been going through already for some
time and it is now wrapped up. Once that piece is done and the next piece for the actual design of
the physical entrance is what they call a Pre-Submittal Meeting. That is where you get into the
details of the geometry of the entrance and that is because you are getting ready to file a
construction plan for the entrance itself. That is a very normal comment that he is guessing Mrs.
Melson-Williams has probably seen on every single DAC Report that she has ever read.
Mr. Hartman asked if that is an opportunity for them to go before DelDOT and implore them to
install a light prior to construction commencement. Responding to Mr. Hartman, Mr. Riemann
18
21
Page 22
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
stated not really at that meeting because the people that are reviewing that really aren’t the
decision makers for that particular conversation; it is based on DelDOT’s traffic section. They
can certainly make that request and he is happy to do it formally if the Commission requires that
to be a condition. They would do that and say that they would like to do that. They just can’t
agree to do it because they have zero say over it. They went through this when they did the
hospital in Milford, DE. The hospital wanted it in the very beginning, and it was a challenge and
it wasn’t until the hospital was constructed that the signal went it. They are happy to try but
DelDOT is in charge.
Mr. Hartman asked if he heard the HOA President of Emerald Pointe say that they have been
fatalities at that intersection. Responding to Mr. Hartman, Mr. Riemann stated that he does not
know that he was aware of it. He is sure that DelDOT is aware of that. When the Traffic Studies
are being completed, he is sure that with DelDOT’s recommendation to install a signal there, that
probably played into DelDOT’s decision making for adding the signal which will certainly make
that movement there safer.
Mr. Hartman asked if the HOA President of Emerald Pointe will have an opportunity to address
DelDOT about his concerns. Is there a public meeting requirement that he could attend?
Responding to Mr. Hartman, Mr. Riemann stated no, there is not a public meeting but his
experience with DelDOT is that anytime somebody from the public gives them a call, they talk
to them. He has definitely had situations where he has gotten feedback as the designer and
engineer in charge of a project that has gotten feedback from constituents and citizens. He has
not heard DelDOT turn them down but there is no public meeting like this; so, he will have to
give them a call.
Mrs. Denney moved to approve re-opening the public hearing to allow the public to speak again,
seconded by Mr. Cooper and the motion was carried 7-0 by voice vote.
Mr. Mark Reaves – 10 Tanzanite Court Dover, DE 19904
Mr. Reaves stated that yes, they did have a conversation with the builder or developers’
representative, and they did explain some things to us. What he is looking for is something a
little bit more substantial. As you know, homeowner associations are purely volunteer and with
COVID, they have been very restricted. So to have an opportunity to have the paperwork that
they submitted to this Board so that they can review and do their own review in order to have
comprehensive questions or have some comprehensive comments. Yes, you have included us in
a Zoom call and we have talked about things but these are significant actions: this Fire
Department Report, the Parks & Recreation Report, the parking issue, the traffic light and the
dealings with DelDOT, and the Traffic Impact Study. All of those are significant things that they
are asking just to be included in. If you send us a link, they can review it, they can read it, they
can understand and digest it amongst their homeowners and just have some significant questions.
He is coming here tonight and listening and finding out things that they had no knowledge of.
We have a management company that is fully staffed and they have an attorney that is working
with them and has had some communication with him. They are just asking to be fully included
in the documentation that they present to the Commission so that they may be able to also
untangle some of the confusion that surrounds these particular documents and have some
communication amongst our Board members. They don’t have that. They asked for that in the
19
22
Page 23
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
beginning when they first started this process two years ago and they continue to ask for that.
They want what gets submitted to the Commission as a representation of what they are actually
going to do. In good faith, if their desire is to truly serve the community and also get your project
done, then make a recommendation to DelDOT to have this signal expedited or put in place first
because he guarantees the minute that a construction vehicle starts down that road and tries to
turn in, someone is going to run into the back of a person trying to turn into the development. It
is just an unnecessary tragedy and if you just request it, that could go a long way to at least
having the community feel like you guys actually really care. Ask the City to back you up and
those voices would probably go a long way to get that done ahead of time rather than to just sit
back and say they don’t do that. They are just asking for the opportunity to have the things that
are going to benefit the community and your project. He wanted to make a follow-up comment
because he doesn’t want it to seem as if they are trying to subvert the project. They just want to
be considered and have the true information that the Commission receives because they are in
the dark with a lot of information and that is not fair to them.
Mr. Hartman stated that as far as the submittals to the Planning Commission, he will ask the
Planning Office to provide that to you but everything that the City has is online. That includes
the DAC Report, the applicant’s submittal, their drawings and their justification for parking. It is
on the City of Dover website and it is called a “Packet” and it would be under the April 18, 2022
Planning Commission Meeting.
Mr. Reaves stated that there were some suggestions that were made to say that they may adjust
particular things. He just wants to know from this Commission, is there a timeframe that you are
requiring that the proposals that the said they would maybe add to their plan would be added or
updated to that plan. Responding to Mr. Reaves, Mrs. Melson-Williams stated that she wanted to
address two concerns. First the concern about communication, the Zoning Ordinance requires for
a Site Development Plan such as this that there is public notice of tonight’s hearing. That public
notice happens in three ways: the bright yellow sign that is posted on the property that includes
information on the project name and how to reach out to the Planning Office. There is also a
legal ad that has to be published in a local newspaper, again, including information about this
meeting tonight and how to contact the Planning Office. The third is a mailing that goes to
property owners within 200 feet of the subject property. So that likely picked up some of the
direct residents of the Emerald Pointe subdivision and she is thinking that maybe some of the
buffer area that is out front that is owned by the HOA through your management company.
Again, that is a notice that there has been an application filed and there is a hearing tonight. Ms.
Bulkilvish has brought up (on the screen) the City’s website which is www.cityofdover.com .
From that main page, there is a link that says Meetings & Agendas and that takes you to all the
meeting agendas and their associated packets for the various Boards and Commissions and City
Council. You can find the meeting agenda as well as what Mr. Hartman referred to as the Packet.
The Paperless Packet is published basically ten days prior to the Planning Commission Meeting
and posted on online for viewing. It includes the DAC Reports and the initial agency comments.
That same packet goes to the Planning Commission members ahead of the meeting. We do try to
include at least a couple of the plan sheets in the Paperless Packet realizing that most projects
have a significant number of plan pages and it would just bog down anybody trying to download
the entire thing. In any case, all of this information can be viewed by the public by contacting the
Planning Office. We can accommodate in person visits to our office or work with an individual
20
23
Page 24
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
in other ways if they truly need to see the application that was filed or review the plans. So we
are trying to make things available electronically. It is not in our Code to specifically contact
specific interest groups with individual applications. The notice elements that she talked about
(the mailing, the ad and the physical posting of the sign) are required to be completed a
minimum of fifteen days prior to the Planning Commission meeting. That is established for all
applications that are required to come before this Board. There is the ability to get some of that
information ahead of time. It is a little bit about understanding how the process works so she
hopes that this has been at least an information session for you as well. Responding to Mrs.
Melson-Williams, Mr. Reaves stated that Mr. Headley is within that 200 foot zone. Fortunately,
his house is that; however, the Emerald Pointe HOA is a corporation which they are represented
by a management company so he would respectfully ask that the Planning Commission include
our management company as a minimum just to get the same notification that Mr. Headley gets
so that they can be aware of any coming information. Our main entrance which is part of our
corporation is within that distance and the notification for anything like that would have to go to
our management company or the corporation itself.
Mrs. Melson-Williams stated that the mailing list is generated by property ownership records. So
what the City has on file as the owner and their contact information for the property is what is
utilized. If it is held by the HOA then they probably need to look into where that mailing is
going. Responding to Mrs. Melson-Williams, Mr. Reaves stated that they do get electric services
at the front entrance also so that is on the mailing list also.
Mrs. Melson-Williams stated that sometimes the electric billing may go to a different entity than
the property ownership so that is why we don’t use the customer utility information and we use
the property tax information. The other question is about how you would find out updates to the
plan, once the Planning Commission takes action on an application. The applicant has a period of
up to two years to make the corrections to the plan and finalize the plan. By getting the various
agency approvals of DelDOT, the Planning Office, the Water & Sewer Plan and that process to
finalize the plan is an administrative process that the Planning Office handles on behalf of the
Planning Commission. The only reason it would reappear before the Planning Commission
would be if there were significant changes to the project such as they decided to not build
apartments and do something else or totally reconfigured everything. Then it would have to go
back through this public hearing process. This site, because it has an area that is zoned C2-A
(Limited Central Commercial) for commercial development, that will be subject to a separate
Site Plan review process that will have to come back through this review body. As they fix things
on the plan, we are not obligated to send out notice but you are certainly welcome to reach out to
the Planning Office. We can advise you to kind of where there are with getting these various
agency approvals and once that happens.
Mr. Cooper stated that just so everybody is aware, he has had a similar discussion with the
Department of Transportation as you guys are having about the traffic signal. It was very
frustrating until he totally understood and wrapped his head around DelDOT’s position on the
subject which is if the traffic doesn’t warrant a traffic device such as a stop light or a stop sign,
which he thinks is what Mr. Street was talking about. He was saying that the development will
create the amount of traffic then that intersection would then need a device. So DelDOT is not
going to give them the permission to do what we are asking them to do and what you are asking
21
24
Page 25
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
them to do until the number of cars are coming through there because of the apartments that
create that. When he had the discussion with DelDOT, it was because his dog got hit by a car
that was going at least twice the posted speed limit on a four block section that has no stop signs.
His hands were tied and DelDOT’s hands were tied because of Federal Regulations that tie
everybody’s hands up. It sounds like Becker Morgan Group is going to make their request but
from somebody who has had a very similar argument all be it about a pet as opposed to a human
life, he just wants you to understand that if they don’t get the results that you want them to, it
very well may not be for the lack of trying. If those cars aren’t going through there, DelDOT is
not going to authorize it.It is frustrating but if it is there and it is not warranted then it actually
becomes more dangerous because people end up running stop light or stop sign as opposed to
stopping for it. You have created more problems than you solve by putting a device there.
Mr. Derek Headley – 3 Gemstone Boulevard Dover DE, 19904
Mr. Headley stated that he just wanted to ask the developers how far the proposed apartments are
going to be from the entrance. Responding to Mr. Street stated that the last time he recalls, he
thinks they were more than 1,000 feet from the entrance itself.
Mr. Headley asked if that will be visible from the corner of Gemstone Boulevard. Responding to
Mr. Headley, Mr. Street stated that what you are going to see from the entrance of Gemstone
Boulevard would be street trees lining that whole entrance. Part of the City’s Code is the
Corridor Overlay Zone and that requires one tree every 50 feet along McKee Road across that
frontage. So right now on McKee Road if you were to look at the site, you would have to look
between those two pockets of trees to get to what you are looking at now. Once the project is
developed, what you are going to have is not only those pockets of trees that you can barely see
through now, you are going to have trees lining those streets and trees across that frontage. There
is going to be landscaping that fills that frontage on McKee Road. The only thing that you are
going to be able to really see from McKee Road would be the Clubhouse.
Mr. Headley stated that when you are looking at the view from a homeowner, as soon as you
come out of the house you don’t want to see the Clubhouse or a bunch of parking areas. That’s
what it seems like he is going to be looking at. Responding to Mr. Headley, Mr. Street stated that
the parking is behind the Clubhouse. It is the gray block that is shown on the map behind the
Clubhouse itself and you’ve also got trees really buffering up the building itself. If you were to
look from the entrance of Gemstone Boulevard up to where that Clubhouse is going to be
situated, you’ve got buffering of trees, landscaping and the like.
Mr. Headley asked what the average price of the apartments are going to be. He is trying to
understand the clientele to expect. Responding to Mr. Headley, Mr. Street stated that these are
market rate apartments that range in price from $1,495 to $2,100.
Mrs. Maucher closed the public hearing.
Mrs. Melson-Williams stated that Staff would remind the Commission about what they have to
make a decision on. It is a Site Development Plan. They have three Waivers that they have
requested. The partial elimination of upright curbing is actually a Waiver that the City Planner as
the authority to issue and they have recommended approval of that. The two Waiver Requests for
22
25
Page 26
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
Planning Commission are a reduction of the parking requirements and the Code does allow for
the Planning Commission to require a placeholding for future construction of parking areas if
you feel that is necessary. The other Waiver Request is the partial elimination of sidewalk along
the property frontage. Then there is the consideration of the Active Recreation Plan and the
Cash-in-Lieu of Recreation Area construction that are part of the process as well. It can be done
in one motion or multiple motions if you feel that you need to split it up to make it make sense
for you.
Mrs. Maucher asked how long the placeholding area for parking would have to be set aside.
Responding to Mrs. Maucher, Mrs. Melson-Williams stated that the Zoning Ordinance, Article 6
Section 3.9 notes that the Planning Commission can require development plans to have an area
of open space designated where parking could be constructed less than or equal to the number
that is being reduced. They have to put a note on the plan and in accepting that reduction, they
agree to construct such additional parking if the Planning Commission after a hearing,
determines that the reasons for granting the reduction no longer exist. If you determine on that
rehearing that the reasons for granting the reduction no longer exist, the owner of record must
construct the parking to meet the regulations during the next construction season just to give
some allowances for time of year. It gives the Planning Commission the ability to require the
placeholding of that parking that they are seeking relief from. Then if it comes to a situation
where it is potentially needed, then there is a hearing on that need to construct the parking before
this body. There is not a specific timeframe but she thinks that if we were experiencing it from a
Code Enforcement matter, people parking on grass surfaces which tends to be a problem or
finding other creative ways to park in the apartment complex, we could certainly bring the
application back to the Commission to consider requiring them to go ahead and build that
parking. Her guess is that if they were experiencing something along those lines and they had
placeheld areas for parking, then they would probably do it on their own accord as they want to
keep their tenants.
Mrs. Maucher stated that that placeholding would not come from any designated building space
already; it would be space other than what has already been designated. Responding to Mrs.
Maucher, Mrs. Melson-Williams stated that Active Recreation Areas are kind of already
designated and if the Commission said they would like them to retain an area where twenty-five
parking spaces could be constructed in the future, then she thinks that their design of the overall
development then would have to figure out where to place those in mass or in several areas to
satisfy that.
Mrs. Denney stated that she is not prepared to make a motion but she feels very strongly that for
her to entertain a motion she would prefer that it include reserved space for parking later. If she
had her rather, it would be that they have to have the parking initially. So, to her, her preference
would be that that space definitely be set aside for the future.
Mr. Hartman asked that if the Commission were to approve this and not approve the Waiver
Request for the parking at all, what kind of problem would that create? Responding to Mr.
Hartman, Mrs. Melson-Williams stated that they could grant approval to the Plan and deny the
request to reduce the parking. In that instance, they would have to revise the design of the Plan in
order to accommodate the full parking requirement which is about 96 parking spaces. That could
23
26
Page 27
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
probably be achieved in a number of ways by adding parking spaces or reducing the requirement
to start with. That could mean that a building goes away so then there is less of a parking
requirement. That would be up to the developer to satisfy the design requirement meeting the
parking requirement.
Mr. Hartman asked if they could come forward with a Waiver Request for partial parking rather
than the full 96. Responding to Mr. Hartman, Mrs. Melson-Williams stated that they could or he
could as part of your action on the Waiver that is before you this evening. You could waive a
certain number of parking spaces or set a parking rate at something like 2.1 for them to achieve
on their site.
Mr. Cooper stated that he pulled that 2.1 number straight out of the air. He has no mathematical
baring on that, it was just between 2.0 and 2.25.
Mr. Hartman stated that it is all out of the air accept what’s in the Code. Responding to Mr.
Hartman, Mr. Cooper stated that he totally agrees. He doesn’t have any heartburn with the partial
curb elimination or the frontage sidewalk as it goes up and then cuts across to the additional walk
on the west side of the street. He is still kind of hung up on the parking. He recognizes the traffic
issue which is a whole separate issue and you can’t address it without making it worse, as bad as
that sounds. That is just the nitch that you are in. He would like to go through the steps to make
up a motion to grant the application with the partial curb elimination waiver and the sidewalk
waiver and then he would like to include the reserved space for future need. He doesn’t
remember what the wording was that Mrs. Melson-Williams used but he forgot it all. He also
doesn’t know the number of spaces that he would want to put in the motion either.
It is reserved space and he thinks that if you split the difference between 96 and 0 and call it 50
as reserved spaces but it’s not actually parking unless it’s needed. So if you are right, it never
happens and if we’re right it does happen but no harm no foul.
Mrs. Denney stated that she has another suggestion and she doesn’t know how this would work
but in the past, she did see a situation like this handled where instead of totally changing the
parking plan that they limited the amount of the sizes of apartments. There were more one
bedroom apartments instead of three bedroom apartments so that it would fit within a reasonable
amount of parking. She does believe what Mr. Cooper has offered is probably the easiest way
and it saves a lot of math. She does think that right now there is just not adequate parking and we
all know that parking is almost always an issue somewhere.
Mr. Hartman stated that with any set-aside, he would not want to see the loss of any Active
Recreation space that has already been diminished Responding to Mr. Hartman, Mrs. Maucher
stated that’s what she indicated, that there would be no reduction in active space.
Mr. Cooper stated that you are going to have to have a reduction in something so it would be a
reduction in open space as opposed to the active space but you are going to have to have a
reduction in something to provide more blacktop. Which is why he thinks going with the
recommendation with requesting the set-aside for the future is the best environmental and
economical compromised way. He can see where an additional 96 spots is probably too many but
he can see where 96 few is too little. He thinks that if they create the set-aside for the future, we
24
27
Page 28
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
are doing it economically and environmentally which is the best of both worlds.
Mrs. Maucher stated that analytically, you could add two spaces per building so if there are
sixteen buildings, that would be thirty-two extra spaces and then the rest would be other spaces.
Responding to Mrs. Maucher, Mr. Cooper stated that you could put the rest of them up at the
pool house as long as you have the space and so that you are not cutting into that active space
and you are not cutting into the open space any more than you have to.
Mr. Hartman asked if we can add a condition to require that the formal contact be made with
DelDOT requesting that a light be placed prior to construction? That might be feudal but if it’s in
writing the politicians will have to act if there are any accidents there and DelDOT didn’t act.
Can we require that as a condition? Responding to Mr. Hartman, Mrs. Melson-Williams stated
that she would say yes because it goes to some of the public health, safety, and general welfare
objectives that you need to consider with a Site Development Plan. She would caution you that
that doesn’t mean that it will happen. If the wording would be that it would encourage the
applicant to seek an earlier timeframe for installation of that signal at the intersection. It is all
going to come down to the DelDOT review and their Entrance Plan and their Entrance Permit
process. In order for them to start any kind of construction, they have to have an access point to
that State maintained road. What the character of that access point is is what she thinks you are
hoping includes a signal sooner rather than later.
Mr. Hartman moved to approve S-21-11 McKee Road Apartments at 1385 McKee Road and the
development application for the construction of sixteen apartment buildings each containing
twenty-four units and to include the condition for a setaside of 50 parking spaces as a condition
of this approval so that if parking spaces are required or needed in the future, that those parking
spaces can be activated and built. Also, with the condition that the applicant formally submit a
request to DelDOT and a courtesy copy to the Emerald Pointe HOA to request a traffic light or
traffic device be installed prior to construction beginning at the site. And to approve the Waiver
for the elimination of the sidewalk and the Waiver for the Cash-in-Lieu of Active Recreation
Area as long as the Active Recreation Area does not diminish below what was represented at this
hearing tonight.
Mr. Cooper asked if he also approved the partial elimination of the curb. Responding to Mr.
Cooper, Mrs. Melson-Williams stated that technically the partial elimination of curbing is
granted by the City Planner. We always include it so the Commission knows.
The motion was seconded by Mrs. Denney and approved 5-2 by roll call vote with Dr. Jones and
Mrs. Welsh absent. Mr. Hartman voting yes; based on the motion. Mr. Baldwin voting yes; with
all of the things that were previously said. Mrs. Malone voting no; the City got in big trouble
many years ago regarding this Cash-in-Lieu of land thing. Mr. Cooper voting yes; for all
reasons previously stated. Mr. Roach voting no; he definitely agrees with Mrs. Malone in
regards to Cash-in-Lieu. He is also very concerned about the concerns of the constituents in that
area. He feels as though we can give it a little bit more time to get well versed in regards to
construction. He definitely loves the plan; it looks beautiful. Mrs. Denney voting yes; with due
respect to Mrs. Malone’s comment about the Cash-in-Lieu of and she does recall that there was
some issues some time ago. She does believe that this project is one of many of the things that
25
28
Page 29
CITY OF DOVER PLANNING COMMISSION APRIL 18, 2022
Item 1.
could have happened there, she thinks that this is a good use for this particular property in this
area. She definitely feels that DelDOT will have to do something but those of us who do this all
the time, we realize that you don’t tell DelDOT, DelDOT tells us. To her, the best that can
happen with the DelDOT situation is that letters with copies to the Governor and the Secretary
of Transportation are the best avenue of helping to make that happen sooner than later. Mrs.
Maucher voting yes; it is a Level 1 Investment Area so there is infills predicted and expected. She
thinks this is a good infill project for the area. She has concerns about the traffic as she travels
that road on a regular basis and she thinks this is desperately needed there.
NEW BUSINESS
Meeting adjourned at 9:48 PM.
Sincerely,
Kristen Mullaney
Secretary
26
29
Page 30
Item 2.
MEMORANDUM
Department of Planning & Inspections
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
DATE: May 6, 2022
TO: Planning Commission
FROM: Planning Office
SUBJECT: Update on Design Revisions of S-19-13 NCALL Offices at 223 & 225 W.
Division Street
Background
On July 15, 2019, the Planning Commission reviewed and held a public hearing on Site
Development Plan S-19-13 NCALL Office Building. The Site Development Plan and Lot
Consolidation Plan Application was approved for the construction of a three-story 7,671 SF
office building together with associated site improvements. The project is located at 223 and 225
West Division Street which is located on the north side of West Division Street east of North
New Street and is zoned C-1A (Limited Commercial Zone). The Site Plan was approved with the
following Waivers:
1) Waiver Request – Elimination of Upright Curbing: The Planning Commission noted the
City Planner/Staff approval to eliminate the requirement for upright curbing as stipulated
in Zoning Ordinance, Article 6 Section 3.6 (b). Staff’s approval to eliminate the upright
curbing requirement was determined due to the applicant’s statement that installing the
upright curbing would hinder stormwater conveyance, and also due to the applicant
having stated they will provide bollards to prevent any damage to surrounding
infrastructure.
2) Waiver Request – Consideration of Tree Mitigation Plan: The Planning Commission
granted approval of the Tree Mitigation Plan allowing instead for the required trees to be
planted at off-site locations within the City of Dover. This was determined as Staff noted
the difficulty planting on this site due to the limited amount of pervious areas available
for suitable planting. The applicant had instead proposed planting one (1) additional tree
each at 18 North Kirkwood Street and 28 North Kirkwood Street. The Tree Mitigation
Plan must also be noted on the Plans.
This Site Development Plan and associated Lot Consolidation Plan further received an Extension
of Planning Commission Approval at their June 2021 meeting. Approval of Site Development
Plan is valid through July 31, 2022. A redesign of the proposed building was cited as one of the
reasons for the delay in finalizing the project.
30
Page 31
Memo to the Planning Commission: Design Revisions of S-19-13 NCALL Offices at 223 & 225 W. Division St. Item 2.
Page 2 of 2
Plan Status as of May 6, 2022 – Update on Design Revisions
The applicant has been working diligently with Planning Staff and all other Reviewing Agencies
on working towards Final Plan Approval which is expected imminently. The Final Plan
submission was received on May 6, 2022 and will be evaluated for final approval by the
Planning Staff. The Applicant had put their Plans on hiatus during the COVID-19 Pandemic but
reached out to Planning Staff in November of 2021 noting intended design changes.
These design changes include the reduction of the number of stories from three (3) to two (2), the
reduction of overall square footage from 7,671 to 5,120, as well as some aesthetic changes to the
exterior of the building. These Revisions are presented in the attached Revised Architectural
Rendering and Site Plan.
Recommendations
Planning Staff is satisfied that the applicant has diligently working towards achieving Final Plan
Approval and ensuring that all Reviewing Agencies are satisfied with the Plans. As the scope of
the building is being somewhat reduced, Planning Staff recommended that they come before the
Planning Commission to apprise them of their planned changes as an item of Old Business. Once
the Final Plan Approval is achieved, they will be seeking the Building Permit to commence
construction work as soon as possible.
Attachments:
• S-19-13 Original Application Submission: Architectural Rendering and associated Site
Development Plan Set
• Notice of Decision Letter dated July 22, 2019 noting Planning Commission Approval
• Letter dated May 24, 2021 requesting a One-year Extension of Planning Commission
Approval
• S-19-13 Revised Architectural Rendering, Floor Plan and associated Site Development
Plan Set as revised by Applicant (and subject of this memo)
31
Page 33
Item 2.
NCALL - DIVISION STREET OFFICE
103 S. BRADFORD ST.
DOVER, DE 19904
P.O. BOX 558
DOVER, DE 19903
T-302-744-9875
F-866-672-6428
33
Page 34
Item 2.
City of Dover
July 22, 2019
Karen B. Speakman
NCALL
363 Saulsbury Road
Dover, DE 19904
Via email: kspeakman@ncall.org
Re: Site Development Plan: S-19-13 NCALL Office Building at 223 and 225 West
Division Street, Dover, DE
Tax Parcels: ED-05-076.08-05-28.00-000 and ED-05-076.08-05-29.00-000
Dear Ms. Speakman:
At its meeting of July 15, 2019, the City of Dover Planning Commission moved to grant
conditional approval to Site Development Plan S-19-13 for construction of a three-story 7,671
SF office building and accompanying site improvements at the above referenced parcels at 223
and 225 West Division Street, Dover. These properties are also the subject of variance
application V-19-04 approved by the Board of Adjustment in April 2019.
As adopted by the Planning Commission, the conditions of plan approval for Site Development
Plan S-19-13 from all reviewing agencies, including the Planning Staff Recommendations (as
adopted), are outlined in the Development Advisory Committee (D.A.C.) Report dated July 3,
2019. A copy of the D.A.C. Report for S-19-13 is enclosed for your reference. If in the future
major changes and revisions are proposed to the site design as presented to the Planning
Commission, you are required to contact the Planning Office to discuss. These changes may
require resubmittal of the plan/drawings for review by the Development Advisory Committee,
the Planning Commission or other agencies making recommendations or taking action in regard
to the application.
In addition, the Planning Commission took action on the following:
1) Waiver Request – Elimination of Upright Curbing: The Planning Commission noted the
City Planner/Staff approval to eliminate the requirement for upright curbing as stipulated
in Zoning Ordinance, Article 6 Section 3.6 (b). Staff’s approval to eliminate the upright
curbing requirement was determined due to the applicant’s statement that installing the
upright curbing would hinder stormwater conveyance, and also due to the applicant
having stated they will provide bollards to prevent any damage to surrounding
infrastructure.
2) Waiver Request – Consideration of Tree Mitigation Plan: The Planning Commission
granted approval of the Tree Mitigation Plan allowing instead for the required trees to be
planted at off-site locations within the City of Dover. This was determined as Staff noted
the difficulty planting on this site due to the limited amount of pervious areas available
for suitable planting. The applicant had instead proposed planting one (1) additional tree
each at 18 North Kirkwood Street and 28 North Kirkwood Street. The Tree Mitigation
Plan must also be noted on the Plans.
P. O. Box 475 Dover, DE 19903
34
Community Excellence Through Quality Service
Page 35
Item 2.
Notice of Decision Letter: S-19-13 Office Building at 223 and 225 West Division Street
July 22, 2019
Page 2 of 2
Planning Commission approval is valid for two (2) years from the date of approval, during which
time the Site Development Plan shall be finalized, Building Permits obtained, and the project
commenced. For Site Development Plan S-19-13, the approval expiration date is July 31, 2021.
To apply for an extension of time from the Planning Commission, this office shall be in receipt
of a letter from the owner/applicant requesting such extension at least 30 days prior to the
expiration of the original approval. The letter requesting the extension shall state the reasons why
an extension is necessary.
When all necessary revisions have been made to the Plan, a Check Print of the Site Plan must be
submitted to the Planning Office for review. Check Print submittals to other Development
Advisory Committee member agencies are required for their approval of the Plan as well.
Coordinate with the other agencies as necessary and forward approval letters to the Planning
Office as they are obtained. Upon determination that the Plan is complete, we will request that
you submit a specific number of signed and sealed copies of the Final Plan to our office for
approval and endorsement for approval.
As a reminder the Public Notice Physical Posting signage should be removed from the property by
July 22, 2019. Physical Posting signage not removed in a timely manner will be treated as an
abandoned sign per the Zoning Ordinance. Should you have any questions or require further
assistance, please contact the plan reviewer Julian Swierczek at (302) 736-7196 or
jswierczek@dover.de.us.
Sincerely,
Department of Planning & Inspections
Dawn E. Melson-Williams, AICP
Principal Planner
Enclosures: Final D.A.C. Report
Cc: David S. Hugg III, Planning Director via email Patricia Kelleher, NCALL
Jason Lyon, Public Works via email File S-19-13
Troy L. Adams, P.E., Mountain Consulting, Inc.
35
Page 36
Item 2.
May 24, 2021
Dawn Melson-Williams, AICP
Principal Planner
City of Dover, Delaware
Department of Planning & Inspections
Delivery via Email: dmelson@dover.de.us
RE: Request for Extension
Site Development Plan: S-19-13
NCALL Office Building at 223 and 225 W Division Street
Dear Mrs. Melson-Williams:
The Notice of Decision Letter for the above-referenced project is dated July 22, 2019. The
approval expiration date is July 31, 2021.
The project experienced a major delay due to the redesign of the proposed building. As a result,
this has impacted the site plan design process. We are requesting an additional year to finalize
the site development plans, obtain the Building Permit, and commence construction. Thank you
for your consideration and we look forward to an approval of our request.
Kind regards,
MOUNTAIN CONSULTING, INC.
Troy L. Adams, P.E.
Vice President
Cc: NCALL
36
Page 37
Item 2.
From: Nick Fedyk
To: Patricia Kelleher; Karen Speakman
Subject: NCALL Office Building update
Date: Thursday, November 5, 2020 1:32:54 PM
Attachments: NCALL First Floor 11.5.pdf
NCALL Second Floor 11.5.pdf
Screen Shot 2020-11-05 at 1.27.53 PM.png
Screen Shot 2020-11-05 at 1.27.34 PM.png
Hi Trish and Karen,
We wanted to share the updated floor plan for the two story building. We also looked at how the massing can work which I have attached a few screen shots of the model.
Sincerely,
Nick
Nicholas L Fedyk | Project Manager
Architectural Alliance Inc.
1309 Veale Rd
Suite 22
Wilmington, Delaware 19810
t 302.478.3777 f 302.478.9577 e n.fedyk@archalli.com
This message is intended solely for the
recipient and should not be opened, read, or
utilized by any other party.
This message shall not be construed as official
project information or as a direction except as
expressly provided in the contract documents.
37
Page 38
Item 2.
53'-11"
91/8"
91/8"
2'-0"
91/8"
11'-81/4"
11'-73/4"
OFFICE OFFICE
7'-1" SPRINKLER
91/8" 8'-7" 5 1/2"
5'-4" 51/2" 11'-71/4" 5 1/2"
12'-6" 51/2" 12'-61/2" 91/8"
STORAGE
51/2" 31/2"
STAIR
51/2" 1'-113/4"
27'-7" 51/2"
7'-71/2"
F
WOMEN
JAN
19'-7"
HALLWAY
51/2"
21'-10"
UP 19
RISERS
91/8"
8'-7" 51/2" 5'-4" 51/2" 19'-63/4" 51/2" 3'-81/2" 4'-10" 51/2" 8'-1" 91/8"
51/2"
7'-7"
DATA 55'-9"
51/2" MEN
MEETING ROOM 31/2"
COPY
51/2"
MECH
10'-1/4"
9'-31/8"
LOBBY ELECT
5'-2" HALLWAY
51/2"
23'-10" 51/2" 51/2"
OFFICE OFFICE OFFICE OFFICE
11'-10"
91/8" 14'-101/4" 51/2" 12'-31/2" 51/2" 12'-11" 51/2" 12'-111/2" 91/8"
13'-10" 13'-10"
91/8"
2'-0"
4" 91/8" 91/8"
N
FIRST FLOOR - 11.9.20
38
Page 39
Item 2.
53'-11"
91/8" 91/8" 91/8"
2'-0" 91/8"
STORAGE
PHONE ROOM
9'-75/8" 9'-71/2"
7'-1"
31/2"
91/8" 51/2" 8'-7" 51/2" 5'-33/4" 5'-5" 6'-8" 5'-31/2" 6'-0" 5'-31/2" 6'-0" 3'-41/2" 91/8"
4'-0"
OPEN OFFICE AREA
7'-23/8"
27'-7" 51/2"
7'-71/2"
WOMEN
JAN
19'-7"
39'-71/4"
51/2"
DN 19
RISERS
17'-13/4"
STAIR
51/2" 8'-31/4" 51/2" 10'-7" 10'-21/2" 4'-101/2" 51/2" 8'-1/2" 91/8"
7'-7"
51/2"
55'-5"
MEN
31/2"
51/2"
F
51/2"
9'-31/8"
MECH
ELECT
RECEPTION 5'-2"
51/2"
23'-10" 22'-33/4" 51/2" 51/2"
OFFICE MEETING ROOM OFFICE
COPY AREA
13'-10"
AND
13'-10" 14'-2"
LOCKERS
91/8" 11'-2" 51/2" 8'-81/4" 51/2" 9'-4" 51/2" 11'-0" 51/2" 12'-41/2" 91/8"
2'-0" 91/8"
91/8" 91/8"
91/8"
N
55'-11"
SECOND FLOOR - 11.9.20
39
Page 41
Item 3.
City of Dover
DATA SHEET FOR SITE PLAN REVIEW & ARCHITECTURAL REVIEW CERTIFICATION
DEVELOPMENT ADVISORY COMMITTEE MEETING OF May 4, 2022
PLANNING COMMISSION MEETING OF May 16, 2022
Plan Title: New Courthouse at South Governors Avenue and West Water Street: Kent County
Family Court S-22-06
Plan Type: Site Development Plan
Location: East side of South Governors Avenue between Bank Lane and W. Water Street
Addresses & 123 Bank Lane ED-05-077.09-03-33.00-000
Tax Parcels: Part of 34 The Green ED-05-077.09-03-35.00-000
401 S. Governors Avenue ED-05-077.09-03-32.00-000
S. Governors Avenue ED-05-077.09-03-36.00-000
411 S. Governors Avenue ED-05-077.09-03-37.00-000
429 S. Governors Avenue ED-05-077.09-03-48.00-000
435 S. Governors Avenue ED-05-077.09-03-50.00-000
439 S. Governors Avenue/117 West Water Street ED-05-077.09-03-51.00-000
441 S. Governors Avenue ED-05-077.09-03-52.00-000
447 S. Governors Avenue ED-05-077.09-03-61.00-000
101 West Water Street ED-05-077.09-03-53.00-000
and an alley
Future Addresses: 415 S. Governors Avenue (Parking Garage)
445 S. Governors Avenue (Courthouse)
Size: 3.7499 +/- acres and alley
Present Uses: Vacant lots, Vacant Residential and Commercial Buildings (proposed for
demolition), and a Parking Lot
Proposed Use: Future site of Family Court (Courthouse)
Zoning: IO (Institutional and Office Zone
SWPOZ (Source Water Protection Overlay Zone)
H (Historic District Zone)
Building Area(s): 106,711 SF (Courthouse) and 144,173 GFA Parking Garage Structure
Off Street Parking: Required – 356 spaces
Proposed – 495 spaces
Sewer & Water: City of Dover
For Consideration: Architectural Review Certification
Tree Mitigation Plan
Waiver Request: Alternative Size of Loading Spaces
P. O. Box 475 Dover, DE 19903 41
Community Excellence Through Quality Service
Page 42
Item 3.
CITY OF DOVER
City of
DEVELOPMENT ADVISORY COMMITTEE Dover
Planning
APPLICATION REVIEW COMMENTARY Office
D.A.C. MEETING DATE: May 4, 2022
APPLICATION: S-22-06 New Courthouse and Parking Garage Structure at South Governors
Avenue and West Water Street
FILE #: S-22-06 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE: 302-736-7196
I. PLAN SUMMARY
This Application for Review of a Site Development Plan Application, associated Lot
Consolidation Plan, and Architectural Review Certification to permit the construction of a five-
story 106,711 GFA (*also listed as 105,259 GFA) government building to serve as the new Kent
County Family Court. The proposal includes a five-story Parking Structure (425 vehicle parking
spaces), parking lot, and other site improvements. The Site presently consists of a series of eleven
(11) parcels consisting of a total of 3.7499 +/- acres and an alley. The properties are zoned IO
(Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection Overlay
Zone), as well as the H (Historic District Zone). The properties are located on the east side of
South Governors Avenue between West Water Street and Bank Lane. The owner of record/
equitable owner is the State of Delaware. Property Addresses: 401, 411, 429, 435, 439, 441, and
447 S. Governors Avenue; 101 and 117 West Water Street; 123 Bank Lane; and part of 34 The
Green. Tax Parcels: ED-05-077.09-03-32.00-000, ED-05-077.09-03-33.00-000, ED-05-077.09-03-
35.00-000, ED-05-077.09-03-36.00-000, ED-05-077.09-03-37.00-000, ED-05-077.09-03-48.00-
000, ED-05-077.09-03-50.00-000, ED-05-077.09-03-53.00-000, ED-05-077.09-03-52.00-000, ED-
05-077.09-03-61.00-000, and an alley. Future Addresses: 415 S. Governors Avenue (Parking
Garage), and 445 S. Governors Avenue (Courthouse). Council District 4.
The Project Site is also subject to Application HI-22-03 New Courthouse at South Governors
Avenue: Kent County Family Court. At the April 21, 2022 meeting of the Historic District
Commission, they considered the Application and have provided a Recommendation on the
Architectural Review Certification for the project. See attached Recommendation Report.
Previous Applications
The Rezoning Application (HI-22-02/Z-22-01) to adjust the boundary of the H (Historic District
Zone) was recently approved to include a series of six (6) parcels consisting of a total of 1.74 +/-
acres and an alley as the balance of the lands for the new Kent County Family Courthouse project
site. Following recommendations of the Planning Commission (March 21, 2022) and the Historic
District Commission (March 24, 2022), the City Council on April 11, 2022 adopted Ordinance
#2022-02 making this zoning change. By the action, the entire project subject area is within the H
(Historic District Zone).
42
Page 43
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 3
At its meeting of July 15, 2021, the City of Dover Historic District Commission took action to
grant approval of the Architectural Review Certificate for the Parking Lot Reconfiguration and
Improvements project at 30 The Green (HI-21-04) along the Bank Lane rear area of the property.
The associated Administrative Site Plan for these parking lot improvements is pending approval as
Final Plans have been submitted.
A portion of the subject area involving the parcel at 439 S. Governors Avenue/117 West Water
Street) and the parcel at 101 West Water Street was previously redeveloped as a parking lot from
its use as a Transit Center. The project was reviewed for Architectural Review Certification as
Application HI-10-11 Kent County Courthouse Parking Lot Addition and Conditional Use/Site
Development Plan S-11-03 Parking Lot on West Water Street: Renovations and Addition (Kent
County Courthouse Parking Lot Addition).
Preliminary Land Use Services Review (PLUS) #2022-04-12:
A development application for this property was reviewed on April 27, 2022 by the Preliminary
Land Use Services. The PLUS Review is required by a City of Dover Memorandum of
Understanding (MOU) for certain types of projects. This MOU requires that non-residential
development of over 75,000 S.F. complete the PLUS Review process prior to application
submission. Due to its Downtown Dover Redevelopment Target Area, this project was not required
to complete PLUS Review process; however, it chose to do so anyway. The PLUS Review Letter
has not been issued; upon its issuance, the applicant must provide a written response to the Review.
II. PROJECT DESCRIPTION
Existing Properties of Subject Project Area:
The subject area has frontage along South Governors Avenue on the east side of the block
between West Water Street and Bank Lane. Several of the properties also have frontage on West
Water Street. There is also an alley running north from West Water Street a distance of
approximately 288 feet. Dover City Council has approved the transfer of this alley from the City
to the State. The Historic District Commission approved Demolition of the building at 401 S.
Governors Avenue on August 19, 2021 (HI-21-05); a Demolition Permit #21-1036 has been
approved for issuance. Additionally, there are three (3) buildings (two residential and one office
building) and an accessory structure within the subject area that are proposed for demolition.
These Demolition Permits were filed February 7, 2022 and are under review pending issuance.
Along Water Street is the Water Street parking lot which currently serves as public parking for
the Kent County Courthouse (located one block to the east at 414 Federal Street/38 The Green)
and other nearby State buildings. The multiple parcels and alley of the subject area are proposed
for a lot consolidation to create the project site for the proposed Kent County Family Courthouse.
Surrounding Land Uses
The subject area lies within the urban street grid of Downtown Dover to the southwest of the
historic Green. To its west across South Governors Avenue is a series of residential and
commercial buildings zoned C-2A (Limited Central Commercial Zone); this area is not located
within the H (Historic District Zone). Adjoining the area to the north in this block consists of
several parking lot areas serving properties at 30 and 34 The Green along with a small one story
commercial building at 401 S. Governors Avenue that is approved for demolition (under
Demolition Permit #21-1036 and HI-21-05). This area is zoned IO (Institutional and Office Zone)
and subject to the H (Historic District Zone). To the east of the subject area, are a series of
properties fronting on The Green and others fronting on South State Street where the zoning is
43
Page 44
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 4
RGO (General Residence and Office Zone) and subject to the H (Historic District Zone). The
buildings in that area include several residences and previous residential buildings now converted
to office use. Directly adjacent is the Water Street parking lot which serves as public parking for
the Kent County Courthouse (located one block to the east at 414 Federal Street/38 The Green)
and other nearby State buildings. To the south across West Water Street, the block includes a
commercial retail building zoned C-2 and a series of office buildings zoned either IO (Institutional
and Office Zone) or RGO (General Residential and Office Zone). Only the property at the corner
of West Water Street and South State Street is within the H (Historic District Zone) along this
street frontage.
III. ZONING REVIEW
IO (Institutional and Office Zone)
The subject property is zoned IO (Institutional and Office Zone); this zoning designation will
remain in place. The description of the IO (Institutional and Office Zone) zoning district is
provided in Article 3 §10 of the Zoning Ordinance and provisions identify the allowable
(permitted) uses and the related bulk standards for the IO zone. The Courthouse and associated
Parking Garage Structure are permitted uses.
SWPOZ (Source Water Protection Overlay Zone)
The property is located within the SWPOZ (Tier 3: Excellent Recharge Area) found in Article 3
Section 29.7 of the Zoning Ordinance. However, this project site is within the Downtown
Redevelopment Target Area which is exempted from the SWPOZ requirements and restrictions as per
Zoning Ordinance, Article 3 §29.79.
H (Historic District Zone)
The entire project site is now located in the H (Historic District Zone) and subject to the provisions
of the Zoning Ordinance, Article 3 §21 and referenced sections. The H (Historic District Zone) is
described in Zoning Ordinance, Article 3 Section 21 with the following purpose statement:
Article 3, Section 21. - Historic district (H).
21.1 Purpose. The purpose of this historic district regulation is to preserve and enhance that
unique character and value of the old portion of Dover as an area of special charm and interest. It
is particularly intended that the regulations prevent, in the historic dis trict, any change of
conditions that would be deemed to be a disfigurement or degradation of the present unique
visual and architectural qualities of the district.
IV. ARCHITECTURAL REVIEW CERTIFICATION
Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review
Certification and related building height, bulk, and setback standards. This process begins with
Review by the Historic District Commission.
Review of DESIGN STANDARDS AND GUIDELINES
Location within the H (Historic District Zone) requires proposals for demolition, new construction,
additions, and certain renovation or rehabilitation activities to receive an Architectural Review
Certificate. As stated in the Design Standards and Guidelines for the City of Dover Historic
District Zone, an Architectural Review Certificate will be granted “if it is found that the
architectural style, general design, height, bulk and setbacks, arrangement location and materials
affecting the exterior appearance are generally in harmony with neighboring structures and
44
Page 45
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 5
complementary to the traditional architectural standards of the historic district.” Zoning
Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and
related building height, bulk, and setback standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter
4: New Construction, Additions, Demolition and Relocation. The Design Standards and
Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria
and development guidelines. The guidelines specify a series of individual considerations for new
construction to be considered in the review by the Historic District Commission (and Planning
Commission) of the project for Architectural Review Certification. Additionally, the proposal
should be reviewed for conformity with the design criteria and development guidelines found in
the Design Standards and Guidelines of Chapter 3: Maintenance, Repair, Preservation, and
Restoration of Existing Historic Buildings. More specifically the sections on Design Guidelines for
Landscaping and Site Amenities, Fencing and Walls, Paving and Bordering, and Parking Lots
found on pages 3-24 through 3-27.
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage,
height, etc. This Proposal for the new Courthouse Building and Parking Structure appears to
conform to most of the bulk requirements of the IO Zoning District. The City of Dover Zoning
Ordinance authorizes the Historic District Commission to waive certain bulk standards when
issuing its recommendation to the Planning Commission for an Architectural Review Certificate if
necessary.
Alternative Bulk Standards – Consideration of Rear Yard Setback
The setbacks of the buildings from the property lines are met except for an area at the rear of the
Courthouse building. This rear setback is required to be 30 feet when adjacent to residential
properties. At its closest point the building is 26.75 feet; therefore, relief must be granted to allow
the encroachment of 3.25 feet (i.e., the rear year setback to be 26.75 feet). The buildings’ height
and number of stories is in compliance with the IO zone. The total lot coverage of the project is
listed as 79% in compliance with the maximum lot coverage of 85% in the IO zone.
HISTORIC DISTRICT COMMISSION - RECOMMENDATION
For the Kent County Family Court project, the Historic District Commission considered the
application HI-22-03 on April 21, 2022 regarding an Architectural Review Certificate for
construction of the Courthouse Building, the Parking Garage Structure, and the various other Site
Improvements. The Historic District Commission considered the proposal for construction
and has provided a recommendation to the Planning Commission in regard to the
Architectural Review Certification for the project. The specific recommendation involved
consideration of the Design Standards and Guidelines. See attached Recommendation
Report from the Historic District Commission.
The Planning Commission should act upon the Architectural Review Certification as part of any
motion to approve this project, or as a separate motion if necessary. In taking this action, the
Planning Commission is to consider the standards and guidelines found in Chapter 4 of the Design
Standards and Guidelines for the City of Dover Historic District Zone and other referenced
sections.
45
Page 46
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 6
V. PARKING SUMMARY
The parking requirement for the IO (Institutional and Office Zone) is based on a rate of one
parking space per 300 square feet of floor area. Based on a total floor area of 106,711 SF the new
Courthouse facility would require 356 parking spaces. The plan notes a total of 495 parking spaces
in structured and surface parking areas.
Parking Garage Structure: The Parking Garage Structure located on the northern portion of the Site
is to house 425 parking spaces. Some of this parking will be secured parking for Court staff. The
entry into the Parking Garage Facility is on its east side from the circulation drive internal to the
site. See description under Building Architecture Section.
Parking Lot Reconfiguration: The current Parking Lot area along W. Water Street will be reduced
in size and have only one access point to the street. The Parking Lot appears to be planned for 56
parking spaces. It is also the proposed location of an underground stormwater management system.
The Parking lot includes planted island areas. This Water Street Parking Lot was previously
constructed in its current form with Site Plan S-11-03 and serves as parking for the Kent County
Courthouse (HI-06-03/S-06-20) as part of a series of strategies to meet that Courthouse’s required
parking (after a 20% Parking Reduction was granted). The Parking Lot was to provide 126 parking
spaces accessory to the Kent County Courthouse. This project for the New Kent County Family
Court Courthouse will accommodate those parking spaces.
The Applicant has noted that they are planning to locate Electric Vehicle charging stations in the
east parking lot area and also with the Parking Garage Structure.
It noted that Application S-22-07 Parking Lot at 446 South Governors Avenue will also develop a
Parking Lot of 45 vehicle parking spaces. The Parking Lot is being constructed as an accessory
parking area for this project.
Loading Berths
Waiver Request: Alternative Size of Loading Spaces
Article 6 Section 4.2 of the Zoning Ordinance states that for governmental buildings, loading
spaces are required at a rate of one loading space per 10,000 SF and one space for each additional
25,000 SF. For the Courthouse, this rate would calculate to five (5) loading spaces. However, the
Code does limit the maximum required to three (3) loading berths (spaces) for buildings up to
150,000 SF in size. Thus, three (3) loading spaces would be required. The Courthouse has
specialized loading area known as a sally port which occurs internal to the building but also
appears to have three dedicated parking spaces for its associated vehicles. Also, at the rear of the
Courthouse additional service areas are located.
The Plan does not show marked loading spaces matching the required dimensions dictated by the
Code. However, the applicant has submitted a written Waiver Request seeking to recognize an
alternative size for the loading spaces by designating the rear of the Courthouse Building as a
service area where loading/delivery activities can occur. This is a gated area (see Fence and Gate
Exhibit Plan).
Bicycle Parking
Bicycle parking shall be provided for parking spaces at a rate of one (1) bicycle parking space for
every twenty (20) parking spaces. Based on the 495 parking spaces provided, twenty-five (25)
bicycle spaces are required. The Plans submitted note Bicycle Parking spaces being provided
46
Page 47
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 7
within the Parking Garage Structure and an outside bicycle parking rack at for a total of 20 spaces;
additional spaces must be designated.
VI. SITE CONSIDERATIONS
Access
The property includes multiple points of access from the adjacent streets. On West Water Street is
access to the surface Parking Lot and also to the sally port of the Courthouse. On South Governors
Avenue, about mid-block between the Courthouse and Parking Garage Structure, is the entrance
drive leading into the site. Another entrance point is off Bank Lane. The circulation pattern of the
drive aisle onsite on the east side of the Parking Garage provides access to the entry points into the
Parking Garage and also serves as the circulation drive to the adjacent parcels. The drive aisle also
continues behind the Courthouse Building is proposed to be partially gated to limit access.
The project has also completed a Traffic Impact Study (TIS). A copy of the review Letter (dated
March 4, 2022) is available in the Application file. The Letter outlines improvements related to the
adjacent physical roadways or traffic controls and the Site Access points. A series of bicycle,
pedestrian, and transit improvements are also noted.
Lighting
Lighting of parking areas is required. The plan currently does not show the location of building
mounted or freestanding light poles in the parking lot area. In general, the broader area using a
decorative black pole with lantern type light fixture. The streetlights along the north side of West
Water Street are currently a single gull wing style light with a silver metal finish. The plan is
unclear regarding the concept for street lighting.
Dumpsters
The Courthouse Building as an institutional type building requires two (2) dumpster pad for the
first 80,000 S.F. of building area and one (1) for each additional 40,000 S.F. of building area or a
fraction thereof. Based on this calculation, three Dumpsters are required for the Courthouse. The
Plan shows two Dumpsters at the rear of the Courthouse building in a service area and are not
visible from the public right-of-way (street). An additional Dumpster area can be reserved for
future use to meet the Code requirement. The Dumpster enclosure detail shall be provided on the
plan to ensure that the architectural components of the Dumpster enclosures match the
construction materials of the proposed buildings.
Sidewalks
Sidewalk is required along all street frontages. The street frontage sidewalks along all three
frontages of West Water Street, South Governors Avenue, and Bank Lane appear to be brick.
Along South Governors Avenue, the wide sidewalk becomes part of the plaza entry system to the
Courthouse Building. Internal to the site there are some concrete sidewalk systems on the south
and east (rear) sides of the Parking Structure. The applicant will be reconstructing the curb and
sidewalks where site improvements and site entrance improvements are proposed.
Curbing
The parking areas and access drives are required to be curbed with upright curbing (Zoning
Ordinance, Article 6 §3.6). Curbing appears to be provided throughout the site.
47
Page 48
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 8
Fencing:
For the equipment compound area, it is partially enclosed by a metal shadow fence revised to be
six feet in height. The compound where a generator and other mechanical (chiller) equipment will
be placed is to the northeast rear of the Courthouse building. There is also a four foot black
ornamental fence proposed on the east side of the Parking Garage Structure entrance drive/shared
access drive adjacent to residential properties. The northern and eastern sides of the surface
Parking Lot also have 4-foot black ornamental fencing proposed. See Fence and Gate Exhibit Plan
dated May 5, 2022 for updated information on the proposed fencing for the project.
VII. BUILDING ARCHITECTURE
The application proposes two buildings for the Kent County Family Court project with the
construction a Courthouse Building and a Parking Garage Structure. A series of building
renderings and drawings were submitted as a Project Architecture Presentation Set (11x17 size
Plan set dated April 1, 2022).
Courthouse Building: A three-story, L-shaped building is proposed at the corner of South
Governors Avenue and West Water Street. The main entrance to the new Courthouse building is
from the multi-level plaza and ramp and stair system on the west side of the building near the
intersection of South Governors Avenue and West Water Street. The first floor of the building is
elevated from the street/sidewalk level. An ornamental tower/cupola element is located on the
West Water Street side of the building. The lobby entry is a building segment that projects towards
the street and consists of paired brick columns capped by a cast stone cornice with name-brand
element. The space between the Courthouse building and W. Water Street includes a lawn area and
tree plantings. The sally port has access from W. Water Street.
The predominant exterior finish material of the Courthouse is brick with detailing provided
through the use of surface definition, brick patterning and cast stone elements. The first floor level
is treated differently from the upper two floors on each façade. The use of brick column details and
glass window openings create a vertical pattern on the west elevation. Glass wall systems figure
more predominately on the south elevation for large openings with a pattern of bay windows in
four segments.
The Courthouse building has a flat roof system. The height is 55 feet 4 inches. to the top of the
parapet wall with the ornamental clock tower reaching a height of 74 feet 6 inches at its roof. The
roof provides a location for roof mounted equipment which is screened. Additional mechanical
equipment is proposed to be located in a fenced compound to the northeast of the building thus
screened from view.
Parking Garage Structure: The Parking Garage Structure is located to the north of the Courthouse
Building at the corner of S. Governors Avenue and Bank Lane. The 5-story structure is
predominately brick and rises to a roof height of 56 feet 10 inches. The stair tower which includes
more glass is located at the southeast corner. The west, north, and east elevations are very
building-like in appearance hiding the ramped parking decks within. The vehicle access to the
garage is via access point from S. Governors Avenue and from Bank Lane which lead to a shared
access drive along east side of the Parking Structure. There are two entry points into the Parking
Structure on its east elevation. There is a second floor level pedestrian bridge connection from the
Parking Garage Structure to the Courthouse; it is predominately glass.
48
Page 49
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 9
See the attached Site Plan set and Project Architecture Presentation Set. The attached elevation
drawings and site plan drawings for detailed information on building dimensions, locations, and
material choices.
VIII. TREE PLANTING AND LANDSCAPE PLAN
Tree Planting Requirements
The Zoning Ordinance further requires a tree planting/landscape plan for at a rate of one tree per
3,000 SF of development area. Based on the development area of 3.7499 acres, a total of fifty-five
(55) trees are required. The Plan notes 43 trees being provided on the Courthouse project main
site; the site is deficient twelve (12) trees. The trees include a variety of deciduous and ornamental
trees. The project proposes a majority of the new trees along the W. Water Street frontage and
throughout the east parking lot islands. There are also trees in the Courthouse entry plaza. Also, for
the Water Street Parking Lot, there are also shrub plantings proposed under the trees adjacent to
the street for further screening. A seasonal planting bed is located at the corner of the Courthouse
building near the clocker tower and also part of the entry plaza area. There are plantings on the
east side of the Parking Garage Structure.
Tree Mitigation Plan
The project site is deficit twelve (12) trees. The Zoning Ordinance allows for consideration of a Tree
Mitigation Plan. The applicant has submitted a Letter providing reasons for the request for Tree
Mitigation and the intent to satisfy the tree planting deficit by planting the trees are other State of
Delaware owned property located within the City.
Opaque Barrier
The Zoning Ordinance requires a buffer between a residential use and a non-residential use (Article 5
Section 7.2). The buffer has two components: an opaque barrier consisting of a wooden fence, a
masonry wall or an earthen berm and a landscape component. For this project, a buffer is required
along the certain portions of the east property line of the subject area. The east property line abuts the
several residential properties and where an access drive/connection to those properties is not located
the plan shows a fence and landscape planting component with one exception. The southern boundary
line of the N/F Lands of Alstadt shows only a fence. Currently, there is a four-foot metal fence adjacent
to that property line and the proposal shows segments of a 6-foot shadow/privacy fence or a 4-foot
black ornamental fence for the area.
The Zoning Ordinance, Article 5 Section 7.22 additionally notes that the Landscape Component of the
Opaque Barrier be either a durable and continuous evergreen planted screen, 6-feet in height at the
time of planting; or a hedge that will grow to a height of at least 6-feet at maturity. The Zoning
Ordinance Article 5, Section 7.24 does allow the Applicant to seek a waiver from the Planning
Commission for the fencing component. There are no provisions to allow for the waiver of the
landscaping component. There are existing trees and vegetation located on the adjacent property.
VIII. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with the agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Information on a proposed Tree Mitigation Plan was submitted to identify the concept for
planting locations for the deficient 12 trees.
49
Page 50
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 10
2) A written waiver request regarding the requirements for loading spaces was received seeking to
acknowledge a service area as the loading spaces.
3) Ensure handicapped access continues to be met at all sidewalk intersections at the entrances and
sidewalks internal to the site. Check access route from Parking Garage to Courthouse.
4) Add handicapped parking spaces to east surface parking lot.
5) Cover Sheet, C001:
a) Site Data #3: Identify building for each address.
b) Site Data #14: List locations of parking and tally number.
c) Site Data#15: Update bicycle parking required to 25 spaces and clarify location on the plan
drawing.
d) General Note #13: Pylon signs are not an eligible sign type for this location.
e) General Note #25: Note exception to SWPOZ for this property’s location.
f) List any waivers and conditions of approval from the Planning Commission.
6) Sheet C101: Note associated Administrative Site Plan for 30 The Green, King of Clubs Parking
Lot Expansion.
7) Sheet C201:
a) Clarify fence (and landscaping) along the property line with Lands of Alstadt property.
b) Clarify location of street frontage sidewalks
c) Identify any special loading spaces/parking i.e., sally port.
8) Sheet C301:
a) Identify location of lighting in parking lot and along street frontages.
b) Identify any overhead electric lines that will be undergrounded in the vicinity of the property.
c) Update General Notes to reflect Department of Public Works and Department of Water &
Wastewater (rather than Department of Public Utilities).
9) Sheet C601:
a) Give distance from parking row to wall of Parking Garage.
b) Show location of striping for fire lanes, traffic control, etc.
c) Show location of any proposed gate system at rear of Courthouse building.
d) Confirm clearance height of pedestrian bridge.
10) Sheet C901: It is recommended that bicycle rack be black in color.
11) Landscape Plan Sheet Series, L101 and L102:
a) Ensure Plan series includes items required by Zoning Ordinance, Article 5 §16.81.
b) Provide tree planting requirement calculation and totals of trees. It appears plan is deficient
12 trees; a Tree Mitigation Plan has been submitted for consideration.
c) Add certification note and signature block for Landscape Architect.
d) Ensure tree planting locations do not conflict with fire hydrants and also maintain separation
distances from utilities lines.
e) Ensure tallies match: check inkberry shrubs. Check the plantings near Lands of Twilley are
included in listing.
50
Page 51
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 11
f) While the Parking Lot at 446 South Governors Avenue may be shown for clarify, this site
has its own development area for calculation of tree planting requirements separate from the
Courthouse.
g) Clarify types (material, form) and heights of proposed fences.
12) Opaque Barrier: The Zoning Ordinance requires that the Opaque Barrier be implemented
where the subject site is adjacent to residential uses.
13) A third Dumpster location must be reserved on the project site.
14) Additional evaluation and review of this project as proposed may be necessary due to the
environment contamination in this area and/or the site’s potential participation in any
environmental remediation program.
a) Provide copies of any agency approvals/permits to the Planning Office so that we may be
aware of any specific conditions of redevelopment.
15) A Record Plan sheet must be provided for review and approval to record the Lot Consolidation
and any proposed easements.
16) Provide construction details for the following items but not limited to, dumpster pad/enclosure,
traffic control signage, lighting fixtures, handicap signage, etc.
17) The construction of the site and parking lot entrances must comply with the requirements of
DelDOT and the City of Dover Public Works Department.
18) The Historic District Commission recommends conditional approval of the Architectural
Review Certificate for the construction of the project. See attached Recommendation Report
for recommended conditions.
19) Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval
by the DNREC must reflect the Site Plan layout and design conditionally approved by the
Planning Commission and be in compliance with the Zoning Ordinance and technical review
requirements of other agencies.
20) The Final Plan set must include notes documenting any action taken by the Planning
Commission on the requested waivers and must list any additional conditions of approval.
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the public
in general, and the residents of the immediate neighborhood in particular shall be taken into
consideration. These safeguards may to the maximum extent possible further the expressed intent
of the Zoning Ordinance and the accomplishment of several objectives in particular listed in
subsections 2.21 to 2.28.
51
Page 52
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 12
1) Architectural Review Certification Staff recommends conditional approval of the Architectural
Review Certificate for the construction of the Kent County Family Courthouse and Parking
Garage Structure finding that each building to be of a contemporary design yet compatible with
the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone.
a) Staff provided a series of recommendations and comments regarding the Architectural
Review Certification and review of the project for compliance the Design Standards and
Guidelines. These items were previously identified during the review of the project by the
Historic District Commission. See HDC Recommendation Report.
2) Tree Mitigation Plan: Staff recommends approval of the proposed Tree Mitigation Plan given
the development limitations of the site due to environmental concerns and spacing limitations
to meet separation distances from utilities and proposed buildings. Staff notes that while the
applicant has not specifically identified an off-site location for the twelve (12) tree plantings
that they are deficient there are many options given the State of Delaware’s land holdings
within City limits. Planning Staff can review and confirm specific tree planting locations as the
project design and plan refinement continues.
3) Opaque Barrier: Staff recommends acceptance of the plan for implementation of the Opaque
Barrier shown on the Fence and Gate Exhibit Plan and the tree and shrub plantings shown on
the Landscape Plan. Given the existing conditions of property access points, utility placements
and property uses, the project appears to be meeting the intent of this buffer requirement
between non-residential and residential uses given the location of the area (subject site and
adjacent properties) within the Historic District.
4) Electric Vehicle Charging Stations: Planning Staff is encouraged to hear that this project is
planning for the installation of Electric Vehicle Charging Stations in its parking lots. Currently,
the Zoning Ordinance does not require them, but many other jurisdictions have implemented
such requirements. Electric Vehicle Charging Stations formats include EV-Capable, EV-
Ready, and EV-Installed.
X. ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the Architectural Review Certification as part of
any motion to approve this project, or as a separate motion if necessary.
2) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers are
at the discretion of the Planning Commission. The Commission may approve or deny waiver
requests.
3) In the event, that major changes and revisions to the Site Plan occur in the finalization of the
Plan contact the Department of Planning and Inspections. Examples include relocation of site
components like paving and increases in floor area. These changes may require resubmittal for
review by the Development Advisory Committee, Historic District Commission, Planning
Commission, or other agencies and commissions making recommendations in regard to the Plan.
4) Following Planning Commission approval of the Site Plan, the Plan must be revised to meet all
conditions of approval from the Development Advisory Committee or as otherwise noted. A
Check Print must be submitted for review by Planning Office Staff and the other commenting
52
Page 53
Item 3.
S-22-06 New Courthouse and Parking Garage Structure at South Governors Avenue and West Water Street
DAC Report of May 4, 2022
Page 13
agencies. Upon determination that the Plan is complete and all agency approvals have been
received, copies of the Plan may be submitted for final endorsement (Final Plan Approval).
5) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
6) The applicant should be aware of the potential for historic archaeological resources which may
include previous building locations, wells, privies, etc. on the property. The State Division of
Historical & Cultural Affairs can provide technical assistance when dealing with
archaeological resources including previous studies at the subject location.
7) Additional specialized evaluation and review of this area may be necessary due to the
environment contamination in this area and/or the site’s participation in any environmental
remediation program.
8) The applicant/developer shall be aware that prior to any ground disturbing activities on the site
the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits
are required.
9) Construction and demolition will have an effect on the adjacent property owners, employees of
adjacent buildings, and nearby sidewalks and streets. Any work requiring the closing or
rerouting of potential customers, employees, or visitors to the adjacent properties (including
those who park in the existing parking lot), and streets or alley should be coordinated as to
offer the least amount of inconvenience. Careful consideration will need to be given to the
access to other properties which requires the crossing of these properties or travel over the
public alley.
10) For building new construction, the requirements of the building code and the fire code must be
complied with. Consult with the Chief Building Inspector and City of Dover Fire Marshal for
these requirements. The resolution of these items may impact the site design including such
items as building dimensions and height, building openings, and fire protection needs, etc.
11) The applicant shall be aware that Site Plan approval does not represent a Building Permit and
associated construction activity permits. A separate application process is required for issuance
of a Building Permit from the City of Dover. Building Permits will be required for each
building.
12) The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it
convey permission to place any sign on the premises. Any proposed site or building
identification sign may require a Sign Permit from the City of Dover prior to placement of any
such sign in accordance with Zoning Ordinance Article 5 §4.
13) The applicant shall be aware that use may be subject to a separate licensing process through the
City of Dover Licensing and Permitting Division. All businesses operating in the City of Dover
are required to obtain a City of Dover Business License. Certain types of uses also require a
Public Occupancy Permit.
If you have any questions or need to discuss any of the above comments, please call the above
contact person and the Planning Office as soon as possible.
53
Page 54
Item 3.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: APRIL 27, 2022
APPLICATION: New Courthouse at South Governors Avenue and West Water
Street
FILE #: S-22-06
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater
CONTACT PHONE #: 302-736-7025
CONTACT PHONE #: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate
capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall
provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling
containers.
2. Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
3. Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District / DNREC is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our
office.
2. The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was
administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at
driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the
curb.
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010.
Please contact our office for more information.
54
Page 55
Item 3.
New Courthouse at South Governors Avenue and West Water Street
File #: S-22-06
April 27, 2022
Page 2 of 4
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance
with the City of Dover Department of Water & Wastewater specifications and requirements.
c. The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736-
7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must
observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be
performed by a City of Dover approved contractor. The proposed location for the water connection may need to be
adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes
must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible
for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an
appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of
the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be submitted prior to
approval so the meter size can be placed on the final site plan. The proposed water meter must be installed in a pit per City of
Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the
tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at
the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be
tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve
should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet
(10’) of the building. A blow up detail of this layout is recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The Department
of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used
for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of
the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall.
A pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90 ) bend and thrust block.
All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe.
Confirm particulars to meet this requirement with mechanical designer.
7. Please call out that the connection to the water main shall be accomplished with a Powerseal 3490AS tapping sleeve and valve.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause
to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage,
uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include
condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water,
surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner
and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the
site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and
invert elevations must be labeled on all sanitary structures.
55
Page 56
Item 3.
New Courthouse at South Governors Avenue and West Water Street
File #: S-22-06
April 27, 2022
Page 3 of 4
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-
way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame
and cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings) showing that
velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance
requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be
provided on the plan.
8. Sanitary sewer laterals shall be connected directly to the main, not manholes, unless impracticable, as determined by the
Department of Water & Wastewater.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This
must be included as a note on the plan. Please remove note #5 on sheet C301.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
STREETS / SANITATION / STORMWATER / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and
providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for
review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of
Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water
until review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water &
Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
4. Water impact fees may be required to be paid prior to Certificate of Occupancy for this project.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with
extending and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources,
Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application
fees, completed forms and plan sets directly to DNREC.
56
Page 57
Item 3.
New Courthouse at South Governors Avenue and West Water Street
File #: S-22-06
April 27, 2022
Page 4 of 4
3. Wastewater impact fees may be required to be paid prior to Certificate of Occupancy for this project.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission
Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
STORMWATER
1. Please be advised that this area is prone to flooding and the City is recommending over management on the site prior to the
connection to the City’s stormwater system.
STORMWATER / STREETS
1. None
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
57
Page 58
Item 3.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: APRIL 27, 2022
APPLICATION: New Courthouse at South Governors Ave & West Water St
FILE #: S-22-06
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Operations Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all existing underground electric, communications and water facilities.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
58
Page 59
Item 3.
New Courthouse at South Governors Ave and West Water St
File #: S-22-06
Apr 27, 2022
Page 2 of 2
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. Provide load sheets if the new load requirements will change as soon as possible to verify proper sizing of transformers
and creation of primary fee estimates. Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
59
Page 60
C F
S-22-06 I IItem 3.
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 04/27/22 D S
O H
V A
E L
APPLICATION: New Courthouse at South Governors Avenue and West Water Street
R
FILE #: S-22-06 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is Mixed Use Courthouse (Business/Assembly/Detention) and a
Parking Structure/Storage.
2. Building Access shall be no further than 50 feet from a primary entrance
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the
width of the door(s) or for 10 feet, whichever is greater.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 100% for the Courthouse and 100% for the Parking Structure and clearly
shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of
two or more stories, measured from the face of the building at grade with a maximum slope of ten
percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be
permitted within the perimeter access, and shall not interfere with emergency services fire ground
operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall
for building of two or more stories.
60
Page 61
Item 3.
5. Fire lanes shall cover 50% for the Courthouse and 50% for the Parking Structure of the proposed
building. Fire lanes are required to be 24 feet wide and run along the front of the building as
determined by the primary entrance(s). In cases where there is more than one primary entrance(s),
each shall be served by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the
closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two
stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located closer
than 15 feet to the exterior wall.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and
face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow
demarcation line shall mark the edge(s) of the fire lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot
intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than
eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall
face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu
of fire lane signs and shall conform to the specifications of 7.6.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over any
fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be
provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or
any other building features shall not apply towards the fire lane accessibility requirements of Section
4.0, Table 5-1 in this chapter.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. Emergency access to rear building areas compliant with City of Dover Code (Appendix B-Zoning,
Article 5- Supplementary Regulations, Section 17);
all four stories and greater buildings require 24ft fire lane at the rear.
All two to three story apartment structures require an 18ft Secondary Fire Lane at the rear.
All townhouses (3-8 units with no fire protection) require a 16ft alley or 18ft secondary fire lane at
the rear.
61
Page 62
Item 3.
12. Multiple Access Roads shall be provided when a fire department access road (fire lane) is determined
by the Fire Marshal to be impaired by vehicle congestion, condition of terrain, climatic conditions, or
other factors that could limit access such as placement of fire hose from fire equipment.
13. Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article VII,
Section A. 13,
Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides
Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides
Alley
12 feet wide
14. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-sac as
outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
15. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
16. Gated Areas: Fire Department access shall be provided to the property through the use of a system or
device approved by the Fire Marshal. The system or device required shall be located in an area
accessible to the fire department and approved by the Fire Marshal. All gates shall be either
automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The
owner or their representative shall meet with the Fire Marshal prior to submission to agree on the
system. A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their representative
shall meet with the Fire Marshal prior to submission to agree on the means to open. A letter of
agreement shall be created and signed by both parties. The letter shall include a detailed description
of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not less
than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be
setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
17. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and
as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation
lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the
fire hydrant and extend for a distance 15 feet on both sides.
62
Page 63
Item 3.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards
filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant
demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of
the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be
facing the edge of the street, or traffic lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
18. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under
the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500
GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM -
painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black.
(2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
19. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to
be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of
the assessed value of the building and is capable of receiving an occupant load 75 persons or greater
or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to install
a complete fire alarm system in accordance with NFPA codes governing the installation of fire
alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required
to be served by the system using the A-weighted scale dBA. In the event the stated requirement
cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of
this section of the Code.
(City Code of Ordinances 46-171)
20. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which
are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be
calculated utilizing the gross square footage of the building, structure, marine vessel, premises and
conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval
for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross
square footage of a non-sprinklered building, may not have another such project for the same
building submitted for review and approval any sooner than three (3) years after the date of the final
inspection unless sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
63
Page 64
Item 3.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing,
processing, display or sale of combustible goods, wares, merchandise, products, or materials when
more than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and
exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment
buildings storage areas except individual unit closets that are located within individual residential
living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101,
as adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard"
under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of
Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or private
school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such
dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant
load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an
occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13 when the following
apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where
alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant
load greater than 100 persons and where alcohol will be served for consumption on the premises.
Any additions or increase in interior size to an existing place of assembly which would create an
occupant load of 100 persons or greater and where alcohol will be served for consumption on the
premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in
accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
21. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within
50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed
access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
64
Page 65
Item 3.
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire
Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department
connections shall be not less than three feet nor more than five feet in height above finished grade.
The fire marshal shall have the authority to require more stringent requirements when deemed
necessary. (City of Dover Code of Ordinances 46-162)
22. Parking and/or obstructions shall be prohibited in front of fire department connections for a distance
measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
23. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would
come off the fire equipment.
24. If there is any type of rack storage, the following will be required: 1) a diagram showing the layout
and type of rack system 2) a list and quantity of items being stored 3) a letter from an
authorized/licensed fire suppression contractor stating that in rack sprinklers are or are not needed.
If in rack sprinklers are not needed, a letter may be requested from an authorized/licensed fire
suppression contractor to ensure that the sprinkler system is adequate for the storage presented.
25. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation
lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of
the connection and extend for a distance of four feet (4') on both sides, and where parking is allow
between the building and the street or fire lane the solid yellow demarcation lines shall extend from
the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the
sidewalk surface). All fire department connections (standpipe and sprinkler) shall have a minimum
12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches
(3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly
visible from the fire lane or roadway, and signs using NFPA international symbols shall be an
acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
26. Standpipes shall be provided in all areas and buildings as required in the codes and standards listed
in Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet
in height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and
standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall
be installed in accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use as
each floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At
the highest intermediate landing between floor levels in every required exit stairway,
65
Page 66
Item 3.
Where intermediate landing is not provided, hose connections shall be permitted to be located at the
main floor landings in exit stairways when approved by the authority having jurisdiction,
Where the local fire department has the capability of providing the required pressure, hydraulically
designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide
the required waterflow rate.
A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021
Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
27. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and
valves located inside structures shall have impact protection, except when located in separate
protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at
a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in
height above the finish grade elevation. Any deviation of the stated requirements must be approved
by the fire marshal and/or chief building inspector. The above dimensions shall serve as the
requirement for installation; however, the fire marshal and/or chief building inspector shall have the
authority to require more stringent dimensions to fit the needs of devices warranting impact
protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be
of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved
by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
28. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley, shall
have displayed on that wall, in legible, easily read characters which are of contrasting color to the
background, the proper street number for such house, building, or structure in accordance with the
following:
One-family and two-family residential structures, height, the number shall measure a minimum of four inches
in height, location, the number shall be placed on the house above or to the left or right of the front
entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers
shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings with
apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location, numbers
shall be placed either in the center of the building or on the street end of the building so as to be
visible from either the public or private street or from the parking lot, color, numbers shall be
contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the street
end of the building so as to be visible from either the public or private street or from the parking lot,
66
Page 67
Item 3.
property line or driveway, should the building be located far enough from a public or private road so that
the numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on each
building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number
affixed to the front of the tenant space and on the outside of the rear door which corresponds with
that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
29. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system that
is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new or
existing building where a fire alarm or sprinkler system is being installed. It shall be the
responsibility of the owner or occupant to keep a set of keys in the secured key box that are
current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service
shall be exempt from this subsection.
Location. The secured key system shall be located as close to the main entrance as possible. Should
the building design not allow the secured key system to be located by the main entrance, the fire
marshal and fire chief shall come to an agreement as to an alternate location for the key box. A
secured key system, once installed, shall not be obstructed from view or obstructed by any means
that would delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress,
whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical
rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire
detection. Keys to individual residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for
new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing
buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before
the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
30. All required means of egress shall have an exit discharge consisting of a non-slip surface and leading
to and terminating at a public way. NFPA 101
31. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where
two or more new passenger elevators are located in a single hoist way and serve all or the same
portion of the building, only one elevator car that provides a car sized to accommodate an ambulance
cot 24 inches by 84 inches in its horizontal position for each hoist way shall be required. Elevator
67
Page 68
Item 3.
cars required to comply with 15.1 or 15.2 shall be identified by the international symbol for emergency
medical services (star of life). The symbol shall be not less than 3 inches (76 mm) in height and shall
be placed inside on both sides of the hoist way door frame. Firefighter recall keys shall be provided in
a manner acceptable to the local fire department. (2021 Delaware State Fire Prevention Regulations
705, Chapter 1, 15)
32. Buildings over 25,000 Sq. Ft are to have radio performance testing done by Delaware State
Communications prior to Final CO. This must be scheduled in advance with Delaware State
Communications.
33. Project to be completed per approved Site Plan.
34. Full building and fire plan review is required.
35. Separate building permits/plans submission will be required for each building and/or tenant fit out. If
the permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans
and permits submissions will be required for each “tenant fit out” at which time a Certificate of
Occupancy will be issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the
“shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.
36. Construction or renovations cannot be started until building plans are approved.
37. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems
require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is
approved.
38. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
39. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
No building or structure in any district shall be erected or structurally altered without a building permit
duly issued upon application to the building inspector. No building permit shall be issued unless the
proposed construction or use is in full conformity with all the provisions of this ordinance. Any building
permit issued in violation of the provisions of this ordinance shall be null and void and of no effect,
without the necessity for any proceedings for revocations or nullification thereof, and any work
undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for
penalties).
1.1 No building permit shall be issued for the construction or alteration of any building upon a lot
without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the
planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of such
building is subject to approval by the planning commission, except upon approval of such plans
approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has
been approved by the planning commission.
1.3 No building permit shall be issued for a building to be used for any conditional use in any zone
where such use is allowed only with approval of the planning commission, unless and until such
approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3
68
Page 69
Item 3.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Please confirm that there is 15’ spacing between the buildings (Courthouse and Parking
Structure) and parking areas as outlined in item # 4 listed above.
2. Please provide the distance of the closest edge of the Fire Lane as outlined in item # 5 listed
above.
3. Ensure that the pedestrian bridge has an unobstructed vertical clearance of not less than 13’-
6”
4. Emergency rear access required as outlined in item # 11 listed above
5. Please provide the hydrant locations and ensure that there is proper distance from them to
the FDC’s.
6. A discussion will need to take place regarding the locations of the FDC’s.
7. Need to confirm the height of the buildings to determine if midrise or high-rise requirements
need to be provided. Midrise is certain occupancy classifications (including detention and
correction) that exceed 50 feet in height up to 75 feet in height. High rise is any building that
exceeds 75 feet in height.
8. Ensure landscape plan does not interfere with item #4 listed above
9. Dumpster enclosure appears to be in the way of emergency rear access
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
69
Page 70
Item 3.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: New Courthouse at South Governors Avenue and West Water Street
FILE#: S-22-06 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Ryan Schroder PHONE#: 302-760-2674
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. A Traffic Impact Study (TIS) Letter for this site was issued on March 4, 2022.
2. Pre-Submittal Meeting was held on March 31, 2022.
3. DelDOT Subdivisions will need to review and approve the development through the
Commercial Record and Entrance Plan process.
4. This project and the Parking Lot at 446 South Governors Avenue (S-22-07) are being
reviewed as one project by DelDOT under the name Kent County Delaware Family Courts
70
Page 71
Item 3.
DEPARTMENT OF NATURAL RESOURCES AND
ENVIRONMENTAL CONTROL
DIVISION OF WATERSHED STEWARDSHIP
CONSERVATION PROGRAMS ENTERPRISE BUSINESS PARK PHONE: (302) 739-9921
SECTION 285 BEISER BOULEVARD, SUITE 102 FAX: (302) 739-6724
DOVER, DELAWARE 19904
MEMORANDUM
TO: Dawn Melson-Williams
City of Dover Planning Office
FROM: Elaine Z. Webb, P.E.
DNREC Sediment and Stormwater Program
DATE: April 27, 2022
SUBJECT: City of Dover Development Advisory Committee Comments
S-22-06 New Courthouse at South Governors Avenue and West Water Street
S-22-07 Parking Lot at 446 South Governors Avenue
CC: Bonnie Arvay, Program Manager II, Sediment and Stormwater Program
DNREC Sediment and Stormwater Program has reviewed the D.A.C. application for the above reference
projects and offers the following comments:
S-22-06 New Courthouse at South Governors Avenue and West Water Street
1. A Sediment and Stormwater Management Plan must be approved by DNREC Sediment and
Stormwater Program prior to any land disturbance taking place on site.
a. DNREC Sediment and Stormwater Program has had preliminary meetings with the owner
and consultant regarding stormwater compliance for the site.
b. The site will comply with Resource Protection Event (RPv, 1-yr storm) requirements through
implementation of a remediation plan.
c. Conveyance (Cv, 10-yr storm) and Flooding (Fv, 100-year storm) event compliance must be
met for the project. An underground stormwater storage facility is proposed.
d. Due to the contamination on site a Contaminated Materials Management Plan (CMMP) must
be adhered throughout construction of the project.
2. A Sediment and Stormwater Plan for the demolition phase of the project is currently under review.
The demolition plan includes the total area of applications S-22-06 and S-22-07. It is expected that
both of the City of Dover DAC applications will be submitted to DNREC as a single Sediment and
Stormwater Plan for the redevelopment phase.
71
Page 72
Item 3.
S-22-06 and S-22-07 DAC Comments
April 27, 2022
Page 2 of 2
3. A Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity has been
submitted that includes the total area of applications S-22-06 and S-22-07. This NOI Permit No.
6692 will continue through the construction phase for both applications until project closeout.
S-22-07 Parking Lot at 446 South Governors Avenue
1. A Sediment and Stormwater Management Plan must be approved by DNREC Sediment and
Stormwater Program prior to any land disturbance taking place on site. Regarding stormwater
management compliance:
a. DNREC Sediment and Stormwater Program has had preliminary meetings with the owner
and consultant regarding stormwater compliance for the site.
b. The site will comply with Resource Protection Event (RPv, 1-yr storm) requirements through
reduction of 15% or greater in impervious surface.
c. Conveyance (Cv, 10-yr storm) and Flooding (Fv, 100-year storm) event compliance will
likely be met through reduction of impervious surface on the site.
2. A Sediment and Stormwater Plan for the demolition phase of the project is currently under review.
The demolition plan includes the total area of applications S-22-06 and S-22-07. It is expected that
both of the City of Dover DAC applications will be submitted to DNREC as a single Sediment and
Stormwater Plan for the redevelopment phase.
3. A Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity has been
submitted that includes the total area of applications S-22-06 and S-22-07. This NOI Permit No.
6692 will continue through the construction phase for both applications until project closeout.
If you should have any questions, please do not hesitate to contact me at (302) 608-5460 or
Elaine.Webb@delaware.gov.
72
Page 73
Item 3.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
APPLICATION REVIEW COMMENTARY Planning
D.A.C. MEETING DATE: 5/27/2022 Organization
APPLICATION: New Courthouse at South Governors Avenue and West Water Street
FILE #:S-22-06 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: James Galvin, Jr AICP PHONE #: (302) 387-6030
The MPO requested the opportunity to bring the recommendations on issues of our concern to the City as well. The
MPO will limit comments to projects to development proposals and applications that may lead to new development.
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or
eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be
waived.
City of Dover Planning Commission 5/16/2022
Project Review
The Dover/Kent County MPO had commented on the nature of the development of the Family
Court House in the previous application for inclusion in the Historic District, referring to the
MPO’s Transit Center Neighborhood Plan. A copy of the 2010 plan is on the MPO’s website:
(https://doverkentmpo.delaware.gov/files/2019/04/Dover-Transit-Center-FY11-min.pdf)
My one question was about transit stop with shelter facilities. It was answered at the PLUS
presentation later in the day (4/27), after the Staff DAC review. There is a pad near the mid-
block access to the parking garage that is acceptable to DTC.
The MPO has no other comments.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
73
Page 74
Duffield Associates, Inc.
5400 LimestoneItem
Road3.
Wilmington, DE 19808
Phone: 302.239.6634
Fax: 302.239.8485
duffnet.com
May 5, 2022
Via Electronic Mail
Ms. Dawn E. Melson-Williams, AICP
Principal Planner
City of Dover
15 Loockerman Plaza
Dover, DE 19901
RE: Project No. 12598CE (Duffield)
Kent County Family Court – Waiver Requests
Tax Parcel Nos. 2-05-07.709-03-(32, 33, 34, 36, 37, 48, 50, 51, 52, 53, 61).00-00001
File # S-22-06
City of Dover, Kent County, DE
Dear Ms. Melson-Williams:
Duffield Associates, LLC (Duffield) is pleased to submit this letter requesting waivers on behalf of the
State of Delaware for the Kent County Family Courthouse.
The project site is located east of South Governors Avenue between Bank Lane and West Water Street.
The site is comprised of Tax Parcel Nos. 2-05-07.709-03-(32, 33, 34, 36, 37, 48, 50, 51, 52, 53, 61).00-
00001 consisting of approximately 3.75 and is currently zoned IO (Institutional and Office) and H
(Historic).
The site is situated within the historic downtown area of the City of Dover along South Governors
Avenue. The site currently has several vacant buildings, parking lots, existing building pads and alley
ways. The proposed site condition consists of a 106,771 gross square foot courthouse, a 5-story parking
structure, parking lot, drive aisles and grass surfaces.
The first waiver request is from relief of the Tree Density requirement. As mentioned in the planning
comments for Application S-22-06 New Courthouse and Parking Garage Structure at South Governors
Avenue and West Water Street project, the project requires 55 trees based on the development area. The
plan currently proposes 43 trees, making the site deficient of 12 trees. We are requesting a waiver from
Appendix B, Article 5, Section 16.62 Tree Density requirement for the tree deficiency. To meet this
requirement, the Zoning Ordinance allows for the consideration of a Tree Mitigation Plan. Per section
Appendix B, Article 5, Section 16.9, “The planning commission may waive the provisions of subsections
16.52, 16.53, and 16.62, and require replacement planting for mitigation purposes should the planning
commission determine, after demonstration by the applicant, that due to physical limitations of the land
which would otherwise prohibit the reasonable use of the land, or for purposes of preserving, protecting
and promoting the interest of public health, safety, welfare and/or public convenience. All tree mitigation
plantings must occur within the corporate limits of the City of Dover.”
Due to the constraints on the site from environmental conditions and required utility placement, there are
limited locations to be able to provide trees to meet the Tree Density requirement. The property is owned
Enhancing our community one project at a time. 74
Page 75
Item 3.
Ms. Dawn Melson-Williams
RE: Project No. 12598CE (Duffield)
Kent County Family Court
May 5, 2022
Page 2
by the State of Delaware, which also owns may properties within the City of Dover. Although a specific
site has not been identified for the tree mitigation plan, it is the intention of this project to provide the
required number of trees through plantings on site and the tree mitigation plan. A total of 55 trees will be
planted for this project.
The second waiver request is for the Alternative Size of Loading Spaces. Per Article 6 Section 4.2 of the
Zoning Code, loading spaces are required at a rate of one loading space per 10,000 sf and one additional
space for each additional 25,200 sf for government buildings with a maximum of 3 loading berths
required. The loading spaces are required to be 12 feet wide by 60 feet long for the first space and 12 feet
wide by 40 feet long for the other spaces. At the rear of the building, the service area is proposed to be
approximately 5,800 sf of “loading area.” This area is not accessible to the public but will be used for
deliveries to the site. Although the physical dimensions have not been provided to meet the loading space
sizes, the area provided for loading meets the intent of the code.
Please do not hesitate to contact us, if you have any questions or comments about the above items. We
appreciate your review of this project.
Very truly yours,
DUFFIELD ASSOCIATES, LLC
K. James Taylor, Jr., P.E.
Senior Project Manager
KJT:tmm
\\Headquarters.duffnet.com\DFS\Share\Projects\12000\12598\CE\Correspondence\Exports\Dover\2022-05-05 DAC Items\SubLtr-12598CE-
20220505.docx
cc: Bill Lenihan, Tevebaugh Architecture
75
Page 76
Item 3.
City of Dover
ARCHITECTURAL REVIEW RECOMMENDATION REPORT
Recommendation from the Dover Historic District Commission
Meeting of April 21, 2022
And Staff Review Repost
Application: New Courthouse on South Governors Avenue: Kent County Family Court
HI-22-03
Owner: State of Delaware
Location: East side of South Governors Avenue between Bank Lane and W. Water
Street
Addresses & 123 Bank Lane ED-05-077.09-03-33.00-000
Tax Parcels: Part of 34 The Green ED-05-077.09-03-35.00-000
401 S. Governors Avenue ED-05-077.09-03-32.00-000
S. Governors Avenue ED-05-077.09-03-36.00-000
411 S. Governors Avenue ED-05-077.09-03-37.00-000
429 S. Governors Avenue ED-05-077.09-03-48.00-000
435 S. Governors Avenue ED-05-077.09-03-50.00-000
439 S. Governors Avenue/117 West Water Street ED-05-077.09-03-51.00-000
441 S. Governors Avenue ED-05-077.09-03-52.00-000
447 S. Governors Avenue ED-05-077.09-03-61.00-000
101 West Water Street ED-05-077.09-03-53.00-000
and an alley
Future Addresses: 415 S. Governors Avenue (Parking Garage)
445 S. Governors Avenue (Courthouse)
Size: 3.7499 +/- acres and alley
Present Uses: Vacant lots, Vacant Residential and Commercial Buildings (proposed for
demolition), and a Parking Lot
Proposed Use: Future site of Family Court (Courthouse)
2019 Comprehensive Plan Designation –Land Use Category: Mixed Use
Present Zoning: IO (Institutional and Office Zone
SWPOZ (Source Water Protection Overlay Zone)
H (Historic District Zone)
For Consideration: Architectural Review Certification Item: Reduction of Rear Yard Setback,
Fence Heights
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 76
Page 77
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 2 of 11
ACTION OF THE HISTORIC DISTRICT COMMISSION:
The application was considered at the April 21, 2022 meetings of the Historic District Commission.
The following members were present at the April Meeting: Chairman Mr. Eric Czerwinski, Mrs.
Ann Horsey, Mr. Jonathan Street, and Ms. Mary Mason. Ms. Mason did not participate in the
review of the Application due to a conflict of interest (per By-Laws). The application was
represented by Elio Battista, Parkowski Guerke and Swayze PA; Michael Newell, Chief Judge of
Family Court of the State of Delaware; William J. Lenihan, Tevebaugh Architecture; K. James
Taylor Jr, PE of Verdantas (Duffield Associates, LLC) and Mr. Macia. Public testimony was
received during the Public Hearing.
Action Taken by Historic District Commission:
The motion to recommend approval passed 3-0 of the members present (with one abstention) at the
April 21, 2002 Meeting. The Historic District Commission recommends approval of the
Architectural Review Certificate for the application referencing the Staff Recommendation
Report and Addendum. The Commission also recommended approval of the Alternative Bulk
Standards to allow a Rear Yard Setback of 25 feet and the use of a fence that is 6-foot in
height at the rear of the building. During the Meeting the Historic District Commission heard the
applicant’s response to the series of Staff Comments and Recommendations (Items 1-13). They
presented information on the materials and finishes selected, agreeing to the 25-foot setback,
bicycle parking strategy, sidewalks, building placement, landscaping, etc. See excerpt of Meeting
Minutes.
The following information was considered by the Historic District Commission in
marking their recommendation including the initial recommendations made by
Planning Staff in regard to the application.
I. PROPERTY INFORMATION
The Historic District Commission will act on a recommendation for an Architectural Review
Certificate for a New Courthouse and Parking Structure for the Kent County Family Court. This
application consists of a project for the construction of a five-story 105,259 GFA government
building to serve as the new Kent County Family Court. The proposal includes a five-story Parking
Structure (425 vehicle parking spaces), parking lot, and other site improvements. The Site presently
consists of a series of eleven (11) parcels consisting of a total of 3.7499 +/- acres and an alley. The
properties are zoned IO (Institutional and Office Zone) and subject to the SWPOZ (Source Water
Protection Overlay Zone), as well as the H (Historic District Zone). The properties are located on
the east side of South Governors Avenue between West Water Street and Bank Lane. The owner of
record/ equitable owner is the State of Delaware. Property Addresses: 401, 411, 429, 435, 439, 441,
and 447 S. Governors Avenue; 101 and 117 West Water Street; 123 Bank Lane; and part of 34 The
Green. Tax Parcels: ED-05-077.09-03-32.00-000, ED-05-077.09-03-33.00-000, ED-05-077.09-03-
35.00-000, ED-05-077.09-03-36.00-000, ED-05-077.09-03-37.00-000, ED-05-077.09-03-48.00-
000, ED-05-077.09-03-50.00-000, ED-05-077.09-03-53.00-000, ED-05-077.09-03-52.00-000, ED-
05-077.09-03-61.00-000, and an alley. Future Addresses: 415 S. Governors Avenue (Park Garage),
and 445 S. Governors Avenue (Courthouse).
77
Page 78
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 3 of 11
Existing Properties of Subject Project Area:
The subject area has frontage along South Governors Avenue on the east side of the block between
West Water Street and Bank Lane. Several of the properties also have frontage on West Water Street.
There is also an alley running north from West Water Street a distance of approximately 288 feet.
Dover City Council has approved the transfer of this alley from the City to the State. The Historic
District Commission approved Demolition of the building at 401 S. Governors Avenue on August 19,
2021 (HI-21-05); a Demolition Permit #21-1036 has been approved for issuance. Additionally, there
are three (3) buildings (two residential and one office building) and an accessory structure within the
subject area that are proposed for demolition. These Demolition Permits were filed February 7, 2022
and are under review pending issuance. Along Water Street is the Water Street parking lot which
currently serves as public parking for the Kent County Courthouse (located one block to the east at
414 Federal Street/38 The Green) and other nearby State buildings. The multiple parcels and alley of
the subject area are proposed for a lot consolidation to create the project site for the proposed Kent
County Family Courthouse.
Surrounding Land Uses
The subject area lies within the urban street grid of Downtown Dover to the southwest of the
historic Green. To its west across South Governors Avenue is a series of residential and commercial
buildings zoned C-2A (Limited Central Commercial Zone); this area is not located within the H
(Historic District Zone). The area to the north of Bank Lane is also zoned C-2A and located in the
H (Historic District Zone) with several commercial office and retail buildings. To the east of the
subject area, are a series of properties fronting on The Green and others fronting on South State
Street where the zoning is RGO (General Residence and Office Zone) and subject to the H (Historic
District Zone). The buildings in that area include several residences and previous bank building and
other residential buildings now converted to office use. To the south across West Water Street, the
block includes a commercial retail building zoned C-2 and a series of office buildings zoned either
IO (Institutional and Office Zone) or RGO (General Residential and Office Zone).
Previous Applications
The Rezoning Application (HI-22-02/Z-22-01) to adjust the boundary of the H (Historic District
Zone) was recently approved to include a series of six (6) parcels consisting of a total of 1.74 +/-
acres and an alley as the balance of the lands for the new Kent County Family Courthouse project
site. Following recommendations of the Planning Commission (March 21, 2022) and the Historic
District Commission (March 24, 2022), the City Council on April 11, 2022 adopted Ordinance
#2022-02 making this zoning change. By the action, the entire project subject area is within the H
(Historic District Zone).
At its meeting of July 15, 2021, the City of Dover Historic District Commission took action to grant
approval of the Architectural Review Certificate for the Parking Lot Reconfiguration and
Improvements project at 30 The Green (HI-21-04) along the Bank Lane rear of the property. The
associated Administrative Site Plan for these parking lot improvements is pending approval as Final
Plans have been submitted.
A portion of the subject area involving the parcel at 439 S. Governors Avenue/117 West Water
Street) and the parcel at 101 West Water Street was previously redeveloped as a parking lot from its
use as a Transit Center. The project was reviewed for Architectural Review Certification as
78
Page 79
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 4 of 11
Application HI-10-11 Kent County Courthouse Parking Lot Addition and Conditional Use/Site
Development Plan S-11-03.
II. HISTORIC PROPERTY INFORMATION
National Register of Historic Places – Dover Green Historic District
The subject area is located within the boundaries of a National Register Historic District,
specifically the Dover Green Historic District. The National Register of Historic Places nomination
for the Dover Green Historic District (K-394) was completed 1973-76 and amended in 1979 and
1984. This federal designation focuses on the area immediately around The Green and extends for
several blocks to its south. The nomination recognizes “the significance of the evolution of Dover
during the eighteenth and early nineteenth centuries.” In the subject area, a series of contributing
and non-contributing resources were listed in the inventory for the National Register nomination.
The resources were predominately dwellings of the 19th century through mid-twentieth century. A
more detailed architectural description is given in the nomination.
It is noted that only three buildings remain today in the subject area on the properties addressed as
429, 435, and 447 S. Governors Avenue. The building at 429 S. Governors appears to be of
twentieth century construction or remodeling having served as office space. The building at 435 S.
Governors Avenue may be the oldest surviving building dating to a nineteenth century initial
construction with later additions. The building at 447 S. Governors Avenue is a dwelling of
twentieth century construction. These building are proposed for demolition as part of the
redevelopment.
Review of Historic Maps
A series of historic maps were reviewed by Planning Staff for preliminary information on this east
side of South Governors Avenue between Bank Lane and West Water Street. The 1859 A.D. Byles
Map of Kent County (Dover insert) shows the beginnings of development in this area with several
buildings along each street frontage as an edge of the urbanized for Dover at the time. Development
continues as more buildings fronting S. Governors Avenue (then known as High Street) and several
buildings fronting on Water Street are shown on the 1868 Beers Map published by Pomeroy &
Beers. The 1885 Bird’s Eye View of Dover appears to indicate that the structures are a collection
of two story buildings with rear additions (residential in appearance) and other detached accessory
structures. The 1887 Map of the Town of Dover by W.R. Roe continues to show a series of
buildings fronting Governors Avenue and Water Street. Also, shown on this map is the alley
leading north from Water Street which serves other properties which front on State Street. The
ownership names listed on these maps seem to indicate that a lot the properties were held by owners
with multiple properties in the general area.
The series of Sanborn Fire Insurance Maps would also be a reference source for information on the
buildings which occupied the subject area over time. For Dover, the Sanborn Maps date from 1897-
1944. The 1919 and 1929 Sanborn Maps show about a dozen of dwelling and duplex dwellings
lining the street frontage at this corner of the block.
79
Page 80
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 5 of 11
Other Studies
The parcel now addressed as 117 W. Water Street (now a parking lot to the west of the alley) was
the location of a series of three dwellings (detached dwelling and duplex units) which were
demolished (by controlled burn) in 1999. See Photo 24 in the Design Standards and Guidelines.
This series of houses on West Water Street was documented by the University of Delaware’s
Center for Historic Architecture and Design as part of the Threatened Buildings Survey program.
III. PROJECT PROPOSAL
PROJECT PROPOSAL (Drawings dated April 1, 2022):
The application proposes construction a Courthouse Building, a Parking Garage Structure, a
Parking Lot, and other site improvements for the development of the Kent County Family Court.
The elements of the project are as follows:
1. Courthouse Building: A three-story, L-shaped building is proposed at the corner of South
Governors Avenue and West Water Street. The main entrance to the new Courthouse
building is from the multi-level plaza and ramp and stair system on the west side of the
building near the intersection of South Governors Avenue and West Water Street. The first
floor of the building is elevated from the street/sidewalk level. An ornamental tower/cupola
element is located on the West Water Street side of the building.
The lobby entry is a building segment that projects towards the street and consists of paired
brick columns capped by a cast stone cornice with name-brand element. The space between
the Courthouse building and W. Water Street includes a lawn area and tree plantings. The
sally port has access from W. Water Street.
The predominant exterior finish material of the Courthouse is brick with detailing provided
through the use of surface definition, brick patterning and cast stone elements. The first
floor level is treated differently from the upper two floors on each façade. The use of brick
column details and glass window openings create a vertical pattern on the west elevation.
Glass wall systems figure more predominately on the south elevation for large openings
with a pattern of bay windows in four segments.
The Courthouse building has a flat roof system. The height is 55 feet 4 inches. to the top of
the parapet wall with the ornamental clock tower reaching a height of 74 feet 6 inches at its
roof. The roof provides a location for roof mounted equipment which is screened.
Additional mechanical equipment is proposed to be located in a fenced compound to the
northeast of the building thus screened from view.
2. Parking Garage Structure: The Parking Garage Structure is located to the north of the
Courthouse Building at the corner of S. Governors Avenue and Bank Lane. The 5-story
structure is predominately brick and rises to a roof height of 56 feet 10 inches. The stair
tower which includes more glass is located at the southeast corner. The west, north, and east
elevations are very building-like in appearance hiding the ramped parking decks within. The
vehicle access to the garage is via access point from S. Governors Avenue and from Bank
Lane which lead to a shared access drive along east side of the Parking Structure. There are
80
Page 81
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 6 of 11
two entry points into the Parking Structure on its east elevation. There is a second floor level
pedestrian bridge connection from the Parking Garage Structure to the Courthouse; it is
predominately glass.
3. Parking Lot Reconfiguration: The current Parking Lot area along W. Water Street will be
reduced in size and have only one access point to the street. The Parking Lot appears to be
planned for 56 parking spaces. It is also the proposed location of an underground
stormwater management system. The Parking lot includes planted island areas.
4. Sidewalks: The street frontage sidewalks along hall three frontages appear to be brick.
Internal to the site there are some concrete sidewalk systems on the south and east (rear)
sides of the Parking Structure.
5. Tree Planting and Landscaping: The project proposes a majority of the new trees along the
W. Water Street frontage and throughout the east parking lot islands. Also, for the Water
Street Parking Lot, there are also shrub plantings proposed under the trees adjacent to the
street for further screening. A seasonal planting bed is located at the corner of the
Courthouse building near the clocker tower and also part of the entry plaza area.
6. Fencing: For the equipment compound area, it is partially enclosed by a metal shadow fence
to be eight feet in height. The compound where a generator and other mechanical (chiller)
equipment will be placed is to the northeast rear of the Courthouse building. There is also a
six foot fence proposed on the east side of the Parking Structure entrance drive/shared
access drive adjacent to a residential property.
See the attached Site Plan set and Project Architecture Presentation Set. The attached elevation
drawings and site plan drawings for detailed information on building dimensions, locations, and
material choices.
IV. ZONING REVIEW
The entire project site is now located in the H (Historic District Zone) and subject to the provisions
of the Zoning Ordinance, Article 3 §21 and referenced sections. Zoning Ordinance, Article 10 §3.2
outlines the review process for Architectural Review Certification and related building height, bulk,
and setback standards.
The subject project area is zoned IO (Institutional and Office Zone) and portions are located within
the SWPOZ (Source Water Protection Overlay Zone – Tier 3: Excellent Recharge Area). The IO
zone allows the use for a Courthouse as a type of public and institutional building and makes the
development subject to provisions of regulations the IO zone.
Review of DESIGN STANDARDS AND GUIDELINES
The subject project site is located in the Dover Historic District Zone within The Green Historic
Context. The Green Historic Context is described on pages 2-3 through 2-5. Location within the
Dover Historic District Zone requires proposals for demolition, new construction, additions, and
81
Page 82
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 7 of 11
certain renovation or rehabilitation activities to existing buildings to receive an Architectural
Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an
Architectural Review Certificate will be granted “if it is found that the architectural style, general
design, height, bulk and setbacks, arrangement location and materials affecting the exterior
appearance are generally in harmony with neighboring structures and complementary to the
traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the
Historic District Commission will provide a recommendation to the Planning Commission
regarding the project’s compliance with the architectural review standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter
4: New Construction, Additions, Demolition and Relocation. Information on the review
considerations is given below.
New Construction
The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8)
provide the design criteria and development guidelines. The guidelines specify the following
individual considerations for new construction to be considered in the review by the Historic
District Commission (and Planning Commission) of the project for Architectural Review
Certification:
• Style
• Scale (building to reflect dominant cornice and roof height of adjacent buildings)
• Elevation of the First Floor
• Floor-to-Floor heights
• Bays, windows and doors (size, relationship, spacing of)
• Absolute Size (compare overall size of new building)
• Massing (relationship of solid-to-void)
• Orientation (location of primary façade)
• Proportions (comparison of height to width of building and elements)
• Materials
• Forms (shape of building and roof to be complementary)
• Siting (location of building on lot and in relation to street)
• High density/ large-scale construction
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage,
height, etc. This Proposal for the new Courthouse Building and Parking Structure appears to
conform to most of the bulk requirements of the IO Zoning District. The City of Dover Zoning
Ordinance authorizes the Historic District Commission to waive certain bulk standards when
issuing its recommendation to the Planning Commission for an Architectural Review Certificate if
necessary.
Alternative Bulk Standards – Consideration of Rear Yard Setback
The setbacks of the buildings from the property lines are met except for an area at the rear of the
Courthouse building. This rear setback is required to be 30 feet when adjacent to residential
82
Page 83
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 8 of 11
properties. At its closest point the building is 26.75 feet; therefore, relief must be granted to allow
the encroachment of 3.25 feet (i.e., the rear year setback to be 26.75 feet). The buildings’ height and
number of stories is in compliance with the IO zone. The total lot coverage of the project is listed as
79% in compliance with the maximum lot coverage of 85% in the IO zone.
Additionally, the proposal should be reviewed for conformity with the design criteria and
development guidelines found in the Design Standards and Guidelines of Chapter 3: Maintenance,
Repair, Preservation, and Restoration of Existing Historic Buildings. More specifically the sections
on Design Guidelines for Landscaping and Site Amenities, Fencing and Walls, Paving and
Bordering, and Parking Lots found on pages 3-24 through 3-27. These guidelines highlight the
consideration that should be given to the areas surrounding buildings including the choice of
materials. It notes that fences in the Historic District should not exceed four (4) feet in height. Also,
the Design Guidelines recommend that 20% of parking lots should be unpaved and planted.
STAFF COMMENTS AND RECOMMENDATIONS
The Staff Comments and Recommendations for this application regarding project activities and
Architectural Review Certification were originally provided in an Addendum document to be
reviewed in conjunction with the Architectural Review Staff Report issued for the April 21, 2022
Historic District Commission Meeting. These Staff Comments and Recommendations have been
incorporated into the Recommendation Report and are given below.
The following are Staff comments and recommendations for this application regarding project
activities and Architectural Review Certification.
1) Staff recommends conditional approval of the Architectural Review Certificate for the
construction of the Kent County Family Courthouse and Parking Garage Structure project
finding that each building to be of a contemporary design yet compatible with the intent of
the Design Standards and Guidelines for the City of Dover Historic District Zone and with
its recommendations for large-scale development in The Green Historic Context. The
proposed Courthouse is oriented to the corner and sited to bring the building close to the
street/sidewalk creating a scale in proportion to the pedestrian and also to other nearby
buildings. Its brick exterior finishes and detailing with building elements and cornice lines at
varying heights break-up the expanse of the building elevations. The materials of brick,
glass window openings, black railings, cast details, the tower cupola element, etc. are more
contemporary in design but reflective of the architectural styles seen in the government
buildings in the nearby Capital Complex. The proposed Parking Garage Structure follows a
similar approach in its design and most notably is very building-like in its exterior
appearance, design and detailing while the parking deck ramp system hidden within its
walls. The on-site Parking Lot also incorporates tree plantings and other landscaping.
2) Associated with the Architectural Review Certification, the following items were given
specific consideration:
a. The project seeks a reduction in the Rear Yard Setback for the Courthouse building
from the required 30 feet when adjacent to residential properties to accommodate a
building placement of approximately 26.75 feet from the property line (also listed as
26.6 feet and 23 feet in various documents). Staff recommends that the Rear Yard
83
Page 84
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 9 of 11
Setback be set at a minimum of 25 feet. This will allow a reasonable setback from
the property line and also space for the circulation drive to access the rear of the
building.
b. It appears that a series of fence segments at a 6-foot height are proposed along the
adjoining property lines to the east. This may be in conjunction with the Opaque
Barrier requirements of the Zoning Ordinance where an opaque barrier(fence) of 6-
foot height and landscape screening is required adjacent to residential properties.
Since this project is in the Historic District, fences generally should not exceed 4
feet. Staff recommends the continued use of a 4-foot black metal fence system along
with landscape plantings for these areas where possible.
3) The following conditions are recommended by Staff to improve project’s compliance with
the recommended guidelines of the Design Standards and Guidelines. The following are
recommended conditions:
a. The selected brick choices should be compatible to the brick of other existing
buildings in the area.
b. Utilize some type of detailing, scoring or division lines to break-up the large cast
stone/concrete foundation area of the building that is visible due to the change in
grade along the site.
c. Utilize black posts for any signage elements to be attached to posts i.e., handicapped
parking signage and any traffic control signs.
d. Signage identifying the Courthouse is integrated into the building as part of a sign
band area in a cornice line. However, consideration of any free standing signage may
require additional review.
e. Any light fixtures/poles utilized on the property for site lighting should utilize a
black finish color. Light fixtures/poles continue style of the lighting used in the
nearby areas of the Historic District. A taller style fixture may be more appropriate
within the parking lot areas and as replacement of overhead lighting along street
frontage.
f. Ensure proposed trees are appropriate to urban planting settings in the parking lot
islands and along streets. Clarify where trees are to be planted as the architectural
renderings include street frontage trees on South Governors Avenue and Bank Lane
that do not appear on Landscape Plan sheet.
g. Any revisions or changes in the identified materials may be subject to further review
by the Historic District Commission.
4) Some of the site improvements/amenities were not specifically described or had limited
information within the application information. Please provide information for consideration
and discussion.
a. Clarify the surface treatment (lawn areas, plantings, type of mulch, etc.) of the
parking lot islands and for planting areas of shrub groupings.
b. Based on the number of parking spaces, the property will require twenty-five (25)
bicycle parking spaces. The bicycle parking rack should be black in finish color and
of a decorative style. Only a location for a 10-space bicycle parking rack outside the
parking garage was found on the plan.
84
Page 85
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 10 of 11
c. Clarify areas where the sidewalks or portions of the sidewalks will be constructed of
brick versus granite pavers and sidewalk. The use of brick paving materials for
sidewalk construction is a key feature found throughout the Historic District area.
d. The location of the sidewalk along the street frontages must be evaluated with
sidewalk construction standards as sidewalk placement typically includes a grass
area along the curb line setting the sidewalk back from the curb. The minimum
width of the sidewalk is five feet but may be greater.
5) The following items should be clarified regarding the building designs.
a. Identify brick material (size, form, etc.) and patterning.
b. Clarify the type of glazing for the window and curtain wall systems as tinted and
reflective glass system may not be appropriate.
c. Clarify the type of system proposed for roof drainage via scuppers, gutters, and
down sprouts, etc.
d. Identify roof screen material (screening for roof mounted equipment areas).
e. Identify style, form, material, etc. for the sally port doors facing W. Water Street.
f. Clarify screening methods for the equipment compound area.
g. Clarify format of “window” openings in the Parking Garage Structure.
6) Staff notes that the project location (buildings and site) may be an opportunity for the
incorporation of public art projects.
7) For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector and Fire Marshal for these
requirements. The resolution of these items can impact the site design in some cases.
8) The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on the property. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing with
archaeological resources including previous studies at the subject location.
9) In the event, that major changes and revisions to the design, materials, or site layout occur in
the finalization of the plan and/or construction drawings contact the Department of Planning
and Inspections. These changes may require resubmittal for review by the Historic District
Commission.
10) This site development plan for this project is also subject to the application and review
process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before the
Planning Commission. Note: Additional technical items for compliance with the Zoning
Ordinance and other regulations may be identified during the Site Plan Process. Review
comments pertaining specifically to the Site Plan set will be issued at that time.
11) The subject area is also subject to completion of a Parcel/Lot Consolidation Plan to combine
the multiple parcels involved into a large tract and to establish any required easements.
12) The applicant shall be aware that Building Permits are required to proceed with any
construction activities on the project site. The permit applications must comply with the
85
Page 86
Item 3.
HI-22-03 New Courthouse on South Governors Avenue and West Water Street
Architectural Review Certification Recommendation Report from Historic District Commission
April 21, 2022 Meeting
Page 11 of 11
approvals and conditions granted through the Architectural Review Certification and Site
Plan Review process.
13) The applicant shall be aware that a Sign Permit is required to proceed with the placement of
signage on the property.
Historic District Commission Action Required
The Historic District Commission considered the proposal at their Meeting of April 21, 2022 and
have provided a recommendation in regard to the Architectural Review Certification for the
Courthouse, Parking Garage Structure, and associated Site Improvements. The recommendation
should reflect consideration of the Design Standards and Guidelines for the City of Dover Historic
District Zone. The specific conditions of the Recommendation are noted in this Report under the
heading of “Action of the Historic District Commission.” See also an Excerpt of the Historic
District Commission Meeting Minutes.
Documents Considered by the Historic District Commission
• Application Submission Letter
• Site Plan Set (14 pages: C001, C101, C201, C301, C401, C601, C901- C906, L101, L102)
• Project Architecture Presentation Set (11x17 plan set) including project site, design
philosophy, architectural renderings and building elevation drawings of Courthouse and
Parking Structure, and photographs of example architecture.
86
Page 87
Item 3.
.. CITY OF DOVER
HISTORIC DISTRICT COMMISSION
April 21, 2022
Excerpt from Meeting Minutes
The Meeting of the City of Dover Historic District Commission was held on Thursday, April 21,
2022, at 3:30 PM in person and virtually using the videoconferencing system WebEx with
Chairman Czerwinski presiding. Members present were Mr. Street, Ms. Horsey, and Mrs. Mason
(Note: The fifth Historic District Commission member has not been appointed following the
completion of the term of Mr. McDaniel in 2020).
Planning Office Staff members present were Mrs. Melson-Williams, Mrs. Savage-Purnell, Mrs.
Bulkilvish, and Mr. Swierczek.
NEW APPLICATION
HI-22-03 New Courthouse at South Governors Avenue and West Water Street – Public Hearing
and Review for Recommendation on Architectural Review Certification for a Site Development
Plan Application and associated Lot Consolidation Plan to permit the construction of a five-story
105,259 GFA government building to serve as the new Kent County Family Court. The proposal
includes a five-story Parking Structure (425 vehicle parking spaces), parking lot, and other site
improvements. The Site presently consists of a series of eleven (11) parcels consisting of a total
of 3.7499 +/- acres and an alley. The properties are zoned IO (Institutional and Office Zone) and
subject to the SWPOZ (Source Water Protection Overlay Zone), as well as the H (Historic
District Zone). The properties are located on the east side of South Governors Avenue between
West Water Street and Bank Lane. The owner of record/ equitable owner is the State of
Delaware. Property Addresses: 401, 411, 429, 435, 439, 441, and 447 S. Governors Avenue; 101
and 117 West Water Street; 123 Bank Lane; and part of 34 The Green. Tax Parcels: ED-05-
077.09-03-32.00-000, ED-05-077.09-03-33.00-000, ED-05-077.09-03-35.00-000, ED-05-
077.09-03-36.00-000, ED-05-077.09-03-37.00-000, ED-05-077.09-03-48.00-000, ED-05-
077.09-03-50.00-000, ED-05-077.09-03-53.00-000, ED-05-077.09-03-52.00-000, ED-05-
077.09-03-61.00-000, and an alley. Future Addresses: 415 S. Governors Avenue (Park Garage),
and 445 S. Governors Avenue (Courthouse). Council District 4. Project Site subject to Rezoning
Application Z-22-01/HI-22-02 which was reviewed by the Planning Commission on March 21,
2022, Historic District Commission on March 24, 2022, and City Council on April 11, 2022.
Mrs. Melson-Williams gave a summary of Application HI-22-03 with the Staff Recommendation
Report and Addendum. The applicant is requesting a Recommendation on Architectural Review
Certification for a Site Development Plan Application and associated Lot Consolidation Plan to
permit the construction of a five-story 105,259 GFA government building to serve as the new Kent
County Family Court. The proposal includes a five-story Parking Structure (425 vehicle parking
spaces), parking lot, and other site improvements. The Site presently consists of a series of eleven
(11) parcels consisting of a total of 3.7499 +/- acres and an alley.
87
Page 88
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
Two items that were noted for the Commission for consideration are the Alternative Bulk
Standards consideration of a reduction of the rear yard setback as well as the request of a 6-foot
height fence in the rear on the east side of the Courthouse building where it adjoins some residential
properties. The Code requires that the setback be 30-feet; the applicant is looking for a reduction
to 25-foot. It also includes the Addendum outlining the Staff Recommendations in regard to the
Architectural Review Certification. The same By-laws of the Historic District Commission are in
place as the last meeting.
Ms. Mason, a member of the Historic District Commission will be unable to participate in the
Commission deliberation on this Application as she is a property owner within 200-feet of this
Application. As part of the By-laws of the Historic District Commission that is deemed a conflict
of interest.
Representatives: Elio Battista, Parkowski Guerke and Swayze PA; Michael Newell, Chief Judge
of Family Court of the State of Delaware; William J. Lenihan, Tevebaugh Architecture; Mr. K.
James Taylor Jr. PE Verdantas (Duffield Associates, LLC)
Mr. Battista stated that he was present to seek Architectural Review Certification and approval
from the Historic District Commission from a legal perspective. Because this is an Architectural
Review Certification you will hear from the Architect. He introduced the fellow members of the
team and guests: Michael Newell, Chief Judge of Family Court of the State of Delaware; Judicial
Officers; representatives from the Kent County Bar Association and Central Delaware Chamber
of Commerce; and the Design Team, Mr. James Taylor, William J. Lenihan and Mr. Rick Macia.
Afterwards we will get into the perviable bricks and mortor of the project.
PRESENTATION
Mr. Taylor stated that the existing Family Court is not sized appropriately for the current use.
The State went through and examined property where they could develop the future Family
Court site. It was selected to be at the corner of Governors and Water Street. As mentioned, they
purposely sought to come fully into the Historic District over the past month to be acquainted
with The Green and other things in the Historic District in the City of Dover. The existing site is
made up of a parking lot that is used for the Court. All of the buildings shown are proposed to be
demolished. This also the site of the contaminated Capital Cleaners site. There have been some
environmental pieces and cleanup that we have had to deal with throughout the process. As we
look at the site design, the Courthouse is approximately 106,000 square foot and the other
proposed building is the parking structure that will be 5-story and 425 parking spaces.
All the properties along The Green are adjacent neighbors. There is access through our site so an
updated access easement has been provided to allow them to get access to their site to continue
and, continue to maintain the integrity of the properties that are facing The Green themselves. As
was mentioned, we are seeking relief of the setback right in this area that's supposed to be 30-
foot but he believes the application mentioned 23-foot. Staff recommended 25-foot and we
believe we would have no issue with the recommendation. The measurement is 26.5 -foot So we
are going have a little bit of play there for construction. If something happens, we don't want to
have to come back to talk to you guys again. The Site itself is zoned IO (Institutional and Office
2
88
Page 89
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
Zone) and the Historic District Overlay. Access points to the Site are going to be from South
Governors Avenue, Bank Lane and Water Street. On that property the back area is actually a
drive aisle. There is a house that sits roughly 300-foot from the building. On this site, brick is
being proposed for the sidewalk. One of the recommendations was to make sure that all of the
sidewalk was brick. We do not not have any issue with and that will be addressed later as well.
Parking is proposed in the parking structure, but there's also a small surface lot that is on the
right-hand side of the property. On the Plans where there is landscaping, we are trying to invest
and meet the intent of the landscaping plan, but there's a large number of trees that are proposed
for the site. We are not able to meet the tree requirement directly, but we are looking at offsetting
the allotment. We want this to be a bright spot in the community as you enter the City of Dover
from the south. The Plaza area along the frontage of the building will allow people access
through that area. They are looking at the interconnection between the parking garage and the
sidewalk.
Mr. Lenihan mentioned that they met and updated the Friends of Old Dover, the Downtown
Dover Partnership and Central Delaware Chamber of Commerce on the project. There was a
feasibility study that justified the need for the square footage for these buildings. The existing
building is approximately 35,000 square feet and the space study showed that we needed
approximately 105,000 square feet to be able to have a safe, secured, and dignified experience
for all working and visiting the Courthouse.
That is obviously a large challenge when you are working within the Historic District. Many
small parcels needed to be acquired and assembled into a larger contiguous site. As you can see
on the screen and the top image is a 3D view of the Courthouse on the right and to the left is the
Parking Structure and their large volumes. The Courthouse is a three-story structure. The parking
deck is a four and a half level because it is a helix going up the ramping system through the
garage. We went to great detail of really thinking about the massing of the building. As I stated
before, you have an excellent set of Historic District Guidelines that really talks about where to
place larger buildings in the District. This parcel was noted that it is appropriate for larger scale
buildings and staying with the Comprehensive Plan and the greater Metropolitan Planning Group
stated that as well. With the building, we really have different elements that Mr. Maseeia is
going to get into with the massing of how we broke down the components and really studied the
existing Historic District and the different buildings in the component’s styles and details, so that
we would really apply those materials on this building as we went forward. With the siting, the
main entrance of the Courthouse is facing the intersection. In the other rendering you'll be able to
see that the building is at a bit of a pedestal at the main intersection there because the grade drops
about 6 feet down to the intersection there. It gave us a larger opportunity to have a larger cast
stone base around the building at that area and have the two- story entrance lobby that presents
itself on the South Governors Ave with the entrance Plaza, which steps in plateau areas that
people will make their way off through ramps or steps in the front entrance way.
With the Historic District Guidelines and also the Secretary of Interior’s Standards really talked
about new construction is to be contemporary but compatible and differentiated. With the
approach we took here, you can see a number of buildings on the right-hand side and bottom.
The buildings and the detailing in the brick and the soldier courses and the heads and the bond of
the brick and the joinery and the top right is actually the Kent County Courthouse which is
3
89
Page 90
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
similar scale of this size building here. Mr. Maseeia who will be speaking next. His office was
involved as an architect designer with the Justice consultant on that project as well. Between all
our joint experience of working in Dover, we truly understand the significance of the details and
the character of the community that we are trying to design this building in a manner that fits into
the existing community. This is a transitional site because we are at the edge of the Historic
District. We have a very modern and new complex with Bayhealth just south of us. We have
mixed development across the street. This gives us the opportunity to design an institutional
building to add to the government civic complex and to make a real Courthouse campus and a
gateway to the site in Dover as people approach Downtown from the south and from the west.
The large rendering is a view from South Governor Avenue looking north. You would see that
there is a tower element with a light at the top, the entrance way, and the circulation tower of the
Parking Garage beyond. You will also see that there is a number of elements, as we call them as
the box window elements, along Water Street. Each of those elements is closer to the scale of lot
of the smaller buildings in the area. So, you'll see that the fenestration within those elements and
along the first-floor banding is a much more human scale as we then have a backdrop of a bigger
building there with it.
Mr. Macia mentioned that he would start first talking a little bit about the process of the building
design’s national Standards and Historic District Guidelines that are very well written compared
to some of the other ones we have seen in other places in the country. We spent a lot of time
walking around, really getting to know the building. Dover has such a rich history about
Colonial, Georgian and Federal. You have a little bit of everything that is really quite interesting.
We also looked at similar projects that really illustrates that. You will recognize the Kent County
Courthouse on the presentation presented. These are projects all over the country that take a
similar approach in terms of creating “compatible and sympathetic but contemporary building
designs.” The one thing that you will see that they have in common is the use of materials,
proportion and types of windows sizes and massing. The fact that all these buildings although
they are contemporary, they have some richness in terms of having different materials, colors,
proportions, and shapes.
We really did look at quite a few items and issues. The first thing that we spent a lot of time on
was to make the building fit well into the concepts here in Dover was material. You can see that
the primary material is brick. It is not a jumbo brick. It is a traditional proportion modular red
clay brick that is very typical in this area. We highlighted that as you can see with expanses of
watertable and cast stone or cast stone elements. Again, those are some materials that you see on
the historic buildings in the area that provides a nice contrast to the brick. Those two materials
are quite important.
Where we have glass at the pedestrian human scale and on some of the special features, there are
individual punch windows vertically portioned, and we try to capture that feeling. It is not
reflective glass at all. It is a clear glass with a little bit of gray. The richness of the texture that
you know those three simple materials provided is enhanced through the massing and the scale
of these elements. So, rather than doing just a simple big box we pulled out the lobby as a two-
story piece and as a primary element so that the public can see it going north or south on
Governors Avenue.
4
90
Page 91
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
The main body of the building itself on Governors Avenue from the most visible street is
actually set back three plus feet. This does a couple of things for us; it makes the lobby the
feature we want the public to help find the entry easily. It really helps to be a wayfinder user
experience, and it breaks down the scale. Additionally, instead of having just one large plane for
the façade, you will see that for both the Garage and the Courthouse, we added a second plane
and pulled the brick forward a little bit. This will add layers and some richness to the building.
The elevator tower is plated with some of the cast stone and extended the top. A lot of your
public buildings here including the State House have these wonderful Colonial Era or Colonial
Revival cupolas. With our contemporary version that will be lit at night and visible from all
sides. We have added a clock to the tower that has double columns and detailed shadow and
richness. The columns are repeated in the lobby.
You know those columns, cornices, clock and tower are all civic elements. This is a Courthouse
and public building, so it is important that it feel like a public building and not a residential or
commercial building. This building will serve a public purpose and at the
same time it is a Family Court. We don’t want to be overpowering, but we do want visitors to the
Court to understand that they are entering a public building where important matters are
discussed and held, and people lives are impacted.
We tried to find a balance between creating a dignified, exterior specific attributes including the
flag poles at the corner, but nothing overpowering.
The previous view is going north on South Governors Avenue. If you go past the hospital this
would be the next thing you see.
If you are going south on Governors Avenue it is a side view from the north, then this would be a
little bird’s eye view and you would see the side of the building. You can clearly see where we
expressed the second plane with individual punched windows with the civic feeling that we are
trying to achieve without becoming overwhelming.
It was previously mentioned that we had 6 feet of grade change, but it is almost 8-feet
to the back corner when you get the Bank Lane. We had to deal with the 6-feet for people in
wheelchairs and ADA Access. It turned out to be a really nice opportunity. So, we created our
entrance plaza as a stepped plaza that comes up with an ADA ramp that comes out of the Parking
Garage. This gives the building some regimen. The railings we are proposing would be a simple
black painted metal very similar to what is on most of the buildings here in town. The plaza
gives something back to the city.
We have these steps on both sides from the north and south as you are coming up from Water
Street. The other nice thing about sitting the building back on both Governors Avenue and Water
Street is it also allows a more generous yard for landscaping. With that generous space, the trees
can grow to mature size and provide some canopy.
On Water Street you will see a little more glass. The glass is very important to us in the sense
that this is where the eight courtrooms are, and all the family matters are held. This is actually
the lobby area, the waiting space in front of the courtroom. We want to have as much natural
5
91
Page 92
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
light in there as possible. We did not want an all-glass building. That certainly would be out of
character. We tried to find the balance by adding bay windows (smaller buildings). The elements
with individual windows are really a scale of some of the traditional building that you see on
State Street. The façade on Water Street has a slightly different character but the base and the
rest of the building continues with some of the same elements.
The Garage is on the north side of the property. The Garage will be cladded in brick. It will be
the same brick that is on the Courthouse. We will be thickening the panels for the first few floors
so that we get those layers of façade. The openings in the Garage will have windows. It is
important in a Garage to make sure that the people using it feel safe; so we try to make sure that
the elevator has glass or a glass wall. We have also repeated some portion of the glass design in
the Courthouse. There will also be a decorative arch panel on the ground floor cut with a pattern
to screen the cars at a pedestrian level.
One of the challenges that we faced is the one place that this building can be seen from The
Green in the Historic District is Bank Lane. If you stand from the west end of The Green, you
will see the garage. We created it so that it will be a little more directly related to the traditional
architecture of the rest of the town.
Mr. Marcia asked if there were any questions before moving on to the Appendix items.
Chairman Czerwinski mentioned that the Design Standards and Guidelines for the Historic
District could be quite vague. This is The Green Context and one of the four Historic Zones in
the Historic District. It states “The Green and the buildings that surround it and by extension its
immediate environs are extremely significant historic resources by any criteria. The complete
enclosure of the Green as well as the excellent state of preservation its buildings make it an
extremely significant historic resource. The Green historic context should be very carefully
preserved and requires the most restrictive design standards. New construction should be very
carefully designed to be compatible with the scale of the Green historic context. Large-scale
development that might be considered for the vacant lots along Governors Avenue or as part of
the hospital complex should be very carefully sited, screened and massed so as not to overwhelm
the character of the Green historic context.” (Pages 2-4, and 2-5 Design Standards and
Guidelines)
Chairman Czerwinski question was regarding the massing as compared to the Kent County
Courthouse. They did a really good job where the windows were enlarged. Here you have so
many windows on the side of the building that it looks like a school. The massive windows are
not compatible compared to what he thinks should be compatible in the Historic District. This
building is actually the cornerstone building of The Green Context. This is the first building that
you will see when you enter the Historic District in Dover from the south. So, when you see this,
you see the massing of the windows as they are. I mean, to me it just does not compliment the
area very well because you are making the windows very small. You have the vertical stripes,
and that to me is kind of in the tower itself. I understand the intent that we are not supposed to
necessarily replicate the architectural design on The Green itself. His concern is the scale and
size. The absolute size of this building “the proportions of new construction should relate to
proportions and the styles present in the immediate neighborhood.”
6
92
Page 93
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
Chairman Czerwinski mentioned that his concern was the 5-story building in the Historic
District. Mr. Marcia responded by stating that the Courthouse is a 3-story building, and the
Parking Garage is a 4 ½ story building.
Chairman Czerwinski asked what the overall height was equivalent to. Mr. Marcia responded by
stating that the cornice line of the Courthouse is approximately 55-feet high and the top of tower
is approximately 75-feet high. Those heights come from the third-floor heights. The first floor
and the second floor are 15-feet and 4 inches to accommodate all the uses in the building
systems. The second and third floors are both 18-feet floor-to-floor heights because of the
courtrooms that have the higher volume; just like this room that we are in here as a higher
volume.
Chairman Czerwinski asked if this was the typical height for a building of this type or because of
the chambers. Mr. Marcia replied that it is typical for this building type. Office buildings may
have something like a 14-foot floor height for each of the floors.
Many of the buildings on The Green, many of them have a first floor that have a 12 or 14-foot
first floor height. The second or third floor would have a reduced height in those residential
buildings.
Chairman Czerwinski as he referred to the Design Standards and Guidelines for the City of
Dover Historic District Zone that the “development pressure in the City of Dover has resulted in
proposals for projects involving structures larger than the predominant two-and three-story scale
of the Historic District. Whenever possibl,e alternative sites for large structures should be sought
outside of the Dover Historic District, and the City of Dover should provide assistance to the
applicant in identifying alternate sites that would be mutually benefit to the applicant and the
City. If alternate sites are not available, the means by which the negative impact of large-scale
buildings can be minimized…” (pages 4-6)
Chairman Czerwinski mentioned that the Design Standards and Guidelines do identify this plot
of land to the southwest of The Green. The “large lots which can be easily screened, areas with
few or no historic structures, or areas which can best accommodate parking facilities.” It talks
about how dominant this structure is compared to everything around it. Now again with the Kent
County Courthouse, they seemed to do a really good job of mitigating some of that effect of the
building by larging the windows and making the scale look a little smaller. This building with
the number of windows and of course the Parking Garage really dominates the skyline especially
when you look at the plan view. When you're coming from the south, it is a very large building.
The design and elements on this building does not necessarily compliment The Green. The
building does not necessarily have to have the architectural features, but there should be some
elements in the Postmodern structure; and he did not see them. He did not see this building as
being the cornerstone of the Historic District in Dover.
Mr. Lenihan mentioned that they went through a very extensive site selection process for this
building. The building became very evident that it was extremely important to keep these
Courthouses directly Downtown. Courthouses are part of the civic structure of the downtown and
do really create a Courthouse campus with the Kent County Courthouse on the other side of the
7
93
Page 94
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
State Street and all the efficiencies that it brings. Obviously, the City of Dover was pushing for
the Courthouse to go on this site as well for those reasons and because of the contaminated site
with Capitol Cleaners and some of the other Brownfield sites. Putting in the Parking Structure
here is really the highest and best use for that land and having the State invest and advance the
development of those properties. It really prohibited any other private developer to do that kind
of work here. We thought that this was really a win-win for that part of the site and to put the
Courthouse at this location. You're correct and we have a lot of small-scale development right
across the street. We don't think that all of that will remain into the future especially right across
Water Street with Bayhealth buying one of the properties there. You know they are going to be
expanding up towards the Water Street as well as we go forward. So, we know that larger scale
buildings are coming here. We had a choice about the Historic District. As you know this site
was split zoned with the Historic District. You requested the balance of the site not being in
Historic District or do you put it all the way in? Based on many conversations with the Planning
Department and that the National Register had the full block in, we thought it was more straight
forward to put the rest of the site in the Historic District. We are on that edge on the boundary of
the Historic District. How do you work with the mass of the building and all the details?
Responding, Mr. Lenihan stated that we would with the direction of having more smaller pieces
of fenestration on the building to try to fit with the scale of the things. The Kent County
Courthouse is on the edge of the Legislative Mall where it is adjacent to much larger buildings.
That is why the design team went with that particular approach. Yes, there are multiple ways to
approach these buildings, but after consensus with many people that what lead the design to
where it is at the current time. We are not mimicking any particular one of them or trying to
recreate one particular style.
Chairman Czerwinski asked if there were any questions or comments?
Mr. Lenihan stated that Mr. Taylor had previously mentioned the setbacks. We are fine with
Staff Recommendation of using 25-feet for that one area. It's a small piece of the Courthouse on
the Site Plan that is adjacent to a residential property. As he stated that residence is 300-feet
away and we need the floor plan of the Courthouse for the space plan of those departments
required in order to place the Courthouse where we are proposing it. We are proposing to reduce
the setbacks from 30-feet to 25-feet. We think that it is still in keeping with intent of the setback.
Fencing
Mr. Lenihan mentioned right now there is a metal decorative fence along the rear side of the
Water Street parking lot that is 4-feet high. We would like to keep that style fence there for the
bulk of that area. Directly behind the Courthouse, we have our loading and receiving area. We
will have gates at both sides to keep it a secure area. We also need to screen some mechanical
equipment, so we are requesting to go to a 6-foot-high fence for that area. We will have a safe
and secure area visually screening the mechanical equipment directly behind the Courthouse. For
the balance of the fencing along the back of the Water Street lot we could go to the 4-foot
fencing. Going north along the new alley off Bank Lane, there is a stockade fence at one section
located near The Green and we want to replace the fencing in that area. The brick for the
building is going to be a modular brick. This is a sample that we're looking to make the basis of
8
94
Page 95
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
design for the brick. One of the things that we talked about is we want the same brick on the
Parking Garage and on the Courthouse that really makes it a campus. With that the Parking
Garage Structure is precast concrete so the pieces will be made in a factory and bought to the
site. We have years of experience with detailing and making sure they really look like they are
buildings with the detailing on the joinery. This particular brick comes in full depth, but it also
comes in this half inch thickness as shown, but it is the same exact brick that will be cast in and
the tolerances are very tight. This particular kind of brick works for both buildings. We looked at
every single building around the site, around The Green, down State Street and along Water
Street and Legislative Mall. We took all selection of bricks and pieces of cast stones like this and
looked at the full range of bricks, the many different colors, sizes, and the joinery. This particular
brick has a range of color within the brick. It also has a range that when you see a larger
sampling of it you will see more range in between the bricks as well. For this project, we will
have a full-scale mockup approximately 6-feet tall and15-feet long where we will have all the
different materials so that we can all have an opportunity to really see it before it goes on the
building, but it is also for the construct ability of the building, to make sure that all the detail is
done properly. A test stone sample was also provided. We have a sister Courthouse in
Georgetown, and the cast stone is more of a buff color for most of the buildings. Here, it is more
of a light gray. Some of it is granite, marble or cast stone.
Post for the Signage
The signage should be painted black, and we will absolutely do that. We will have signage on the
Site and on the Courthouse. Right now, we are proposing some signage on the south and north
side of the lobby cornice. We have not designed it to any greater detail than that at the current
time. Of course, for any Site Signage etc. we would absolutely come back to you and work
through your signage program.
Light poles
Yes, they would be black as well. We have been working with the City of Dover and across the
street outside the Historic District on another Site. This will be entered into the street light
program with the City of Dover and use their fixtures there and around the perimeter of this Site.
We would like to use the fixtures of the district and then we will see if we need a different style.
We want to make sure we have the right footcandles in the parking lot levels. They will be
painted black.
Trees (Urban Planting)
Mr. Taylor mentioned they are currently proposed to work appropriately in the parking lot areas.
There was question about whether there would be trees along South Governors Avenue in front
of the Parking Structure. That was one thing that we had been looking at, but unfortunately there
were a number of things that came into play. DelDOT is requesting a bus stop to be placed along
the northbound South Governors Avenue frontage. The other piece is the City of Dover Electric
Department has requested electric run in the space between the property line which is shown is
the dark thick black line. Unfortunately, currently in that area we will not be proposing trees to
be placed between the spacing of the sidewalk and spacing of the building where the electric
wants to go. We cannot maintain 10-foot in order for those trees to grow. So that's one thing
unfortunately, that we were trying to get that we could not do.
9
95
Page 96
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
Site Improvements and Amenities
Mr. Taylor mentioned that there was a question regarding the surface treatment. There is a wide
variety that was labeled on the Landscape Plan that was part of the packet submission. There
were areas where lawn and groundcover plantings were identified. There will be some mulch and
river stone areas. There is a wide variety of surface treatments being proposed throughout the
site. Twenty-five bicycle parking spaces are required for the Site, we are currently proposing 10
parking spaces. Ten of the spaces are shown exterior of the Parking Garage and ten interior
spaces. We will make sure that there are 25 spaces shown whether it is interior or exterior to the
site.
Sidewalks
Mr. Taylor stated that as previously mentioned that all of the sidewalk on the Site will be
constructed of brick rather than granite. The ADA ramp area will be concrete. The granite pavers
are going to be used on the plaza area and the remainder will be brick sidewalks. There was a
question regarding the location of the sidewalks on the street frontage and grass strip between the
road and the sidewalk. Currently, the Water Street side actually has the brick sidewalk directly
up against Water Street which we will continue to maintain. If you look at the Historic District
throughout Dover there is not much of a grass strip, most of the sidewalk is right up against the
roadway. We are trying to carry the historical look and feel into this property.
Building Design
Mr. Lenihan mentioned that the pattern of the brick will be a running bond with concave joints.
The glazing of the windows will be insulated glass of two panes with air space in between and
clear to slightly gray tinted on the interior. This is required to reduce the solar heat gain into the
building. The downspouts of the roof will be roof drained within the roof so you will not see
gutters or downspouts along the perimeter. They will all be contained within the building. The
roof screen will be a painted metal screen. We will have more detailed information once the
product is selected for the equipment screening and with the fencing product that was
recommended. As previously mentioned, the windows in the Parking Garage will be openings
with aluminum frames and air opening ventilation through the Parking Structure. There will be a
4-feet high, 24-feet long mural coming over from the courtroom. We have identified other areas
within the Courthouse like the second story area of the internal lobby as an area for artwork. We
have not designed it or worked with another group. We have a rich history of working with other
organizations and artists with projects. We are familiar with the requirements from the State and
the City of Dover for archeological surveys. We will notify the State Historical and Cultural
Affairs. As previously mentioned by Mr. Marcia, we do not propose any other major changes or
revisions, but we are fully aware if we need to come back before you for those items we will. We
are working on advancing the Parcel and Lot Consolidation. There is one parcel (The Shank
Shack) that is very close to going to settlement and everyone agrees. We are aware that we need
permits including building and signs for the project.
Chairman Czerwinski asked if there were any additional questions from the Historic District
Commission members.
Ms. Horsey asked for a point of clarification about the landscaping. She understood what was
previously mentioned about trees not been planted on the northbound South Governors Avenue
frontage. She wanted to know if any other type of the plantings could go there? Mr. Taylor
10
96
Page 97
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
replied that it is up to the City of Dover Electric Department because it is their utility going in
that area. They have requested it to go into that area in case they would need to access in case
there is any issue in the future. It has to be on a property and there is about 5-foot on the backside
of the sidewalk to our property line that we cannot touch because it is in the DelDOT right-of-
way. Therefore, we are left with the 10-foot setback. Mr. Lenihan also replied if they could get
any type of plantings or flowers, they would pursue that. They are proposing trees along Water
Street side of the Courthouse.
Mr. Street mentioned that not to disagree with Chairman Czerwinski because they were great
points. He has seen the presentation for the second time. This is the second time a new
application has come in that has at least been considerate of the architecture of the city. He liked
what you tried to do on the Water Street side because that is a challenging side due to the change
in grade and building elevation. Having worked in the Bank Lane area, he liked what you are
trying to do in the Bank Lane area which almost mimics the visual of what is on The Green. He
can appreciate that, so thank you.
Mr. Czerwinski opened the public hearing to those in the room and also those in the virtual
meeting. Also, in the virtual audience was Ms. Addie Spicer that is involved with the project
team.
Ms. Dina Carol Vendetti, President of the Central Delaware Chamber of Commerce mentioned
that she was present to enthusiastically support the project. She too has heard the presentation
three times and there is much about this project that they are excited about. They are excited
about the additional foot traffic Downtown, the potential use of the parking garage, bringing
people closer to the historic area and having them understand that there are things there to avail
themselves of and there are ways to learn about the rich history of our area. We like the
rendering and design of the building. They understand the safety factor and that the building
needs to be bigger than the current Courthouse. There is only so much that you can do with a
great big building to make it look like the area. We felt like the design team did a really good
job. Although, it does not look like a historic building, there is a balance there that kind of ties it
into the area. When you approach the City of Dover from either the west or the south, we like the
idea that this is what you will see instead of the often-overlooked corner that you currently see.
For us it is what is good for the businesses. This is something that would be very good for the
businesses in that area. Our Board have put their heads together and decided to support this
project.
Mr. Adam Gerber, Past President on behalf of the Kent County Bar Association mentioned that
they supported the building and the design. There is definitely a need for more space and parking
as he appears before the Court few times throughout the year.
Mr. Czerwinski closed the public hearing to those in the room and also those in the virtual
meeting after seeing no one else wishing to speak.
Mrs. Melson-Williams noted the letter received from Central Delaware Chamber of Commerce
on 4-21-22. The letter was provided to all members of the Historic District Commission
members. The letter reflects the comments that Ms. Vendetti just made about their support of this
project, both the Courthouse and Parking Garage.
11
97
Page 98
Item 3.
Excerpt of Historic District Commission Meeting Minutes APRIL 21, 2022
There were no additional questions from the Historic District Commission members.
Mr. Street moved for approval of the Architectural Review Certification for Application HI-22-
03 and Staff Recommendation Report and Addendum, the Alternative Bulk Standards-
Consideration of 25-foot Rear Yard Setback as well as the request of a 6-foot height fence in the
rear. The motion was seconded by Ms. Horsey and approved 3-0 with one member abstaining
due to conflict of interest.
Roll Call Vote
Ms. Horsey – Yes
Mr. Street – Yes
Ms. Mason – Abstaining due to conflict of interest
Mr. Czerwinski – Yes
12
98
Page 99
x
4' BLACK
x
ORNAMENTAL
x
FENCE
PROPOSED
PARKING
5-STORY
STRUCTURE
PROPOSED FAMILY
6' SLIDING GATE
COURT BUILDING
x
x
x
4' BLACK
ORNAMENTAL 4' BLACK
x
6' SLIDING GATE 6' SHADOW / FENCE ORNAMENTAL
GATE
x PRIVACY FENCE EXISTING FENCE
x TO BE REMOVED
x
4' BLACK ORNAMENTAL FENCE
4' BLACK
x ORNAMENTAL
FENCE
x
x
4' BLACK
ORNAMENTAL
FENCE
DESIGNED BY: AR DUFFIELD
DATE:
SHEET: SCALE: ASSOCIATES
FENCE AND GATE EXHIBIT Soil, Water & the Environment
DRAWN BY: AR
5400 LIMESTONE ROAD
WILMINGTON, DE 19808-1232
KENT COUNTY FAMILY COURT TEL. 302.239.6634
PROJECT NO.
FAX 302.239.8485
CHECKED BY: KJT
415, 445 & 446 S GOVERNORS AVENUE OFFICES IN DELAWARE, MARYLAND
PENNSYLVANIA AND NEW JERSEY
CITY OF DOVER ~ KENT COUNTY ~ DELAWARE FILE: EX-Fence-12598CE E-MAIL: DUFFIELD@DUFFNET.COM
1" = 80'
12598CE MAY 5, 2022
Item 3.
FIGURE 199
Page 100
Item 3.
OFFICES IN DELAWARE, MARYLAND,
WEB: HTTP://DUFFNET.COM
DUFFIELD ASSOCIATES Soil, Water & the Environment
SITE DEVELOPMENT PLAN 5400 LIMESTONE ROAD
KENT COUNTY FAMILY COURT WILMINGTON, DE 19808-1232
PENNSYLVANIA AND NEW JERSEY E-MAIL: DUFFIELD@DUFFNET.COM
HST SG
ORT
WN OVE
NORTH NORTH
ATE
S ST
TEL. 302.239.6634
RNO
S NE RS A ST
SITE T
415 & 445 SOUTH GOVERNORS AVENUE
WS
VE
H ST
FAX 302.239.8485
NE ORT
K LA WN
BAN
E
K LAN
BAN
S ST
R ST
ATE
ST WW
ATE
LG-Lot1-Index-12598CE
SITE
P.E. #21140
KENNETH JAMES TAYLOR, JR., P.E.
R ST
OVE
CHECKED BY:
TH
ST SOU
SG
ER
FILE NAME:
WAT
WS
W
S NE SA
T NOR
VE KJT
4/1/2022
DESIGNED BY: STATE: DELAWARE
DRAWN BY:
T
TH S
SOU
SCALE: 1" = 400' LOCATION MAP LOCATION MAP SCALE: 1" = 1,200' KJT AR
SITE DATA: CHK'D BY
GENERAL NOTES: 1. APPLICATION NO.: DATE
2. TAX PARCEL NOS./ ED05-077.09-03-32.00 ED05-077.09-03-33.00 ED05-077.09-03-35.00
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STATE OCCUPATIONAL SAFETY LAWS AND THE CITY OF DOVER ROAD SITE ADDRESS/ 401 GOVERNORS AVE 123 BANK LANE 34 THE GREEN
CODE AND STANDARD SPECIFICATIONS, MOST CURRENT EDITION. SOURCE OF TITLE/ D 4627 0013, D0562 0135 D 0675 0057 D 5968 0065, D 0325 0101
2. EXISTING UTILITIES ARE SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR, BUT THE COMPLETENESS OF ACCURACY OF THE ZONING: IO, H, SWPOZ IO, H, SWPOZ IO, H, SWPOZ
SAME IS NOT GUARANTEED. THE CONTRACTOR SHALL DETERMINE THE LOCATION AND ELEVATION OF EXISTING UTILITIES AT HIS x
PROPOSED PARKING x ED05-077.09-03-36.00 ED05-077.09-03-37.00 ED05-077.09-03-48.00
OWN EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES AND REPAIRS TO EXISTING UTILITIES DURING S GOVERNORS AVE 411 S GOVERNORS AVE 429 GOVERNORS AVE
CONSTRUCTION. 5-STORY STRUCTURE D 5968 0065, D 0325 0099 D 10530 0336, D 8349 0134 D 9539 0184, D 5362 0259
3. THE EXISTING UTILITIES SHOWN WERE TAKEN FROM THE BEST AVAILABLE RECORDS. THE CONTRACTOR SHALL CONTACT MISS 28,825 SF IO, H, SWPOZ E 0019 0082 D 0576 0132
IO, H IO, H
UTILITY OF DELMARVA (1-800-282-8555) TO VERIFY THEIR EXACT LOCATION PRIOR TO THE START OF ANY CONSTRUCTION. ANY (144,173 ± GFA x
REVISION
DAMAGE INCURRED TO ANY UTILITIES SHALL BE REPAIRED IMMEDIATELY AT THE CONTRACTORS' EXPENSE. IF THE CONTRACTOR 425 PARKING SPACES ED05-077.09-03-50.00 ED05-077.09-03-51.00 ED05-077.09-03-52.00
RELIES ON THE UTILITY LOCATIONS SHOWN HEREON, HE DOES SO AT HIS OWN RISK AND WILL NOT BE ENTITLED TO ADDITIONAL 435 S GOVERNORS AVE 117 W WATER ST 441 S GOVERNORS AVE
10 BICYCLE SPACES) D 9375 0211 16855, D 0028 0357 D 5537 0321, D 0576 0132 D 9305 0223, IS 0033 0396
COMPENSATION DUE TO THE DELAYS FROM SAID RELIANCE.
IO, H IO, H H 0037 0092
4. ALL ROADS, PARKING AND OTHER PAVED AREAS WILL BE PRIVATELY OWNED AND MAINTAINED AND ARE NOT INTENDED FOR 415 SOUTH IO, H
DEDICATION. GOVERNORS ED05-077.09-03-53.00 ED05-077.09-03-61.00
5. DELAWARE REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREES AND STUMPS ON AVENUE 101 W WATER ST 447 S GOVERNORS AVE
CONSTRUCTION SITES. ANY SOLID WASTES FOUND DURING EXCAVATION MUST BE REMOVED AND PROPERLY DISPOSED. D 0334 0347 D 9373 0337, D 8809 0223
6. ALL HANDICAPPED PARKING DEMARCATION, STALLS AND BUILDINGS ACCESSIBLE ROUTES SHALL COMPLY WITH THE AMERICANS IO, H, SWPOZ IS 0033 0396
IO, H
WITH DISABILITIES ACT AND ANSI A117.1-1998 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES.
7. THIS DRAWING DOES NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. ALL CONSTRUCTION MUST BE DONE IN 3. PROPOSED ADDRESS: 415 & 445 GOVERNORS AVE
COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES AND REGULATIONS THERETO DOVER, DE 19901
APPURTENANT.
4. LEGAL OWNER/ THE STATE OF DELAWARE
8. BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION, HE MUST OBTAIN THE PROPER PERMITS AND/OR APPROVALS FROM THE DEVELOPER: ATTN: JENNIFER COVERDALE
CITY OF DOVER, KENT CONSERVATION (KCD), DELAWARE DEPARTMENT OF TRANSPORTATION (DELDOT), AND APPROPRIATE STATE 540 S DUPONT HIGHWAY STE 1
No. - -
AND COUNTY AGENCIES. DOVER, DE 19901
PHONE (302) 739-6148
9. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDING TO THE CITY OF DOVER AND THE STATE OF DELAWARE FAX (302) 739-3037
STANDARDS AND CONSTRUCTION SPECIFICATIONS. EMAIL: JENNIFER.COVERDALE@DELAWARE.GOV
10. ALL FIRE LANES, FIRE HYDRANTS, AND FIRE DEPARTMENT CONNECTIONS SHALL BE MARKED IN ACCORDANCE WITH THE STATE FIRE
OWNER/ STATE OF DELAWARE
PREVENTION REGULATIONS. 5. SITE ACREAGE: EXISTING: 163,347 SF (3.7499 AC) PROPOSED: 163,347 SF (3.7499 AC)
11. ALL WORK WITHIN STATE MAINTAINED ROAD RIGHT-OF-WAYS SHALL MEET THE REQUIREMENTS AS SET FORTH IN THE CURRENT 6. ZONING: EXISTING: IO (INSTITUTIONAL & OFFICE)
REVISION OF THE STANDARD SPECIFICATIONS FOR THE ROAD AND BRIDGE CONSTRUCTION, BY THE DELAWARE DEPARTMENT OF H (HISTORIC DISTRICT)
DOVER, DE 19901
TRANSPORTATION (DELDOT). SWPOZ (SOURCE WATER PROTECTION OVERLAY ZONES TIER 3 EXCELLENT
x x x x RECHARGE AREAS),
12. TRAFFIC AND SAFETY CONTROL SHALL BE MAINTAINED DURING CONSTRUCTION IN CONFORMANCE WITH THE CURRENT VERSION OF PROPOSED: IO, SWPOZ, H
THE DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR CONSTRUCTION AND MAINTENANCE OPERATIONS.
DEVELOPER: 540 S DUPONT HIGHWAY
x
6. LAND USE: EXISTING: VACANT BUILDINGS/PARKING PROPOSED: COURTHOUSE
13. ALL PROPOSED SIGNAGE (PYLON SIGNS, MONUMENT SIGNS) IS SUBJECT TO A SEPARATE CITY OF DOVER PERMIT.
14. STORMWATER MANAGEMENT SEDIMENT/EROSION CONTROL SHALL BE IN ACCORDANCE WITH THE CURRENT DELAWARE SEDIMENT 7. NUMBER OF LOTS: EXISTING: 11 PROPOSED: 1
AND STORMWATER REGULATIONS BY THE DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL
(DNREC). 8. MONUMENTS: EXISTING: 0 PROPOSED: 15
15. CONTRACTOR SHALL REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS OF PROPOSED BUILDING FOOTPRINTS. THE PROPOSED 9. DATUM: HORIZONTAL: NAD 83 DE STATE PLANE VERTICAL: N.A.V.D. 1988
BUILDING FOOTPRINTS, AS SHOWN ON SITE PLAN, SHOULD ONLY BE USED AS A REFERENCE TO THE ABOVE MENTIONED PLANS. PROPOSED FAMILY
16. WATER SUPPLY, SANITARY SEWER AND STORM DRAIN LINES PROPOSED BY THIS PLAN ARE PRIVATE AND SHALL BE MAINTAINED BY COURT BUILDING 10. BENCHMARK: MAG NAIL SET #1 MAG NAIL SET #3
THE OWNER. 43,620 SF 445 SOUTH N: 420408.77'± N: 420972.34'±
GOVERNORS E: 625469.58'± E: 625291.28'±
17. THE SITE CONTRACTOR SHALL NOTIFY THE CITY OF DOVER DEPARTMENT OF UTILITIES CONSTRUCTION MANAGER AT 302-736-7070 (106,711 ± GFA) ELEV.= 22.07' ELEV.= 28.71'
PRIOR TO THE START OF CONSTRUCTION. A REPRESENTATIVE FROM THE CITY OF DOVER DEPARTMENT OF PUBLIC UTILITIES MUST AVENUE
OBSERVE AND APPROVE ALL CITY OWNED WATER AND SANITARY SEWER INTERCONNECTIONS AND TESTING. ALL WATER TAPS MUST 11. REQUIRED PROVIDED
BE PERFORMED BY A CITY OF DOVER APPROVED CONTRACTOR. THE PROPOSED LOCATION FOR THE WATER CONNECTION MAY DISTRICT AND BULK STANDARDS: IO (INSTITUTIONAL & OFFICE)
NEED TO BE ADJUSTED IN THE FIELD DUE TO CONDITIONS OF THE EXISTING MAIN. POSSIBLE CONDITIONS THAT WOULD REQUIRE MINIMUM LOT AREA: 10,000 SF 163,347 SF
TAPPING RELOCATION INCLUDE PROXIMITY TO PIPE JOINTS, OTHER TAPS, CONCRETE ENCASEMENTS, CONFLICT WITH OTHER MINIMUM LOT WIDTH: 100'
MINIMUM LOT DEPTH: 100'
UTILITIES, AND THE LIKE. TEST HOLES MUST BE PERFORMED BY THE CONTRACTOR TO DETERMINE THE BEST TAPPING LOCATION OR MINIMUM FRONT YARD SETBACK: 10' 10'
KENT COUNTY FAMILY COURT
FOR ANY WORK REQUIRED BY THE CONTRACTOR TO MAKE AN APPROPRIATE AND LAWFUL CONNECTION. MINIMUM SIDE YARD SETBACK: 10' 10'
18. PART II, CHAPTER 180, ARTICLE III, SECTION 180-10 OF THE CODE OF KENT COUNTY REQUIRES THAT NO PERSON SHALL DISCHARGE MINIMUM REAR YARD SETBACK: 15' (30' WHEN ADJOINING RESIDENCE ZONE) 26.75'
MINIMUM LANDSCAPE BUFFER N/A
OR CAUSE TO BE DISCHARGED ANY STORMWATER, SURFACE WATER, UNCONTAMINATED GROUNDWATER, ROOF RUNOFF, MAXIMUM BUILDING HEIGHT: 10 STORY / 150 FEET 5 STORY / 54'7"
SUBSURFACE DRAINAGE, UNCONTAMINATED NONCONTACT COOLING WATER, CONDENSATE, OR UNPOLLUTED INDUSTRIAL PROCESS MAX FLOOR AREA RATIO: 6.0 1.54
WATERS TO ANY SANITARY SEWER. THE CONTRACTOR/DEVELOPER SHALL ENSURE DURING CONSTRUCTION THAT NO ILLEGAL MAX LOT COVERAGE: 85% 79%
CITY OF DOVER ~ KENT COUNTY ~ DELAWARE
DISCHARGES TO THE SANITARY SEWER SYSTEM ARE CREATED WITH THE SITE IMPROVEMENTS.
19. BOUNDARY AND TOPOGRAPHIC SURVEY DATA SHOWN HERE WAS PREPARED BY TRANSITION ENGINEERING SURVEYING, INC. DATED 12. LAND DEVELOPMENT DATA:
FEBRUARY 16, 2021. EXISTING BUILDINGS: 5,832 S.F. [0.1339 AC.] (3.57%)
SITE DEVELOPMENT PLAN
20. THE ENTIRE SITE IS LOCATED WITHIN FLOOD ZONE X AS DEPICTED ON FEMA MAP #10001C0169J, DATED JULY 7, 2014. EXISTING OTHER IMPERVIOUS: 152,517 S.F.[3.5013 AC.] (93.37%)
EXISTING OPEN SPACE: 4,998 S.F. [0.1147 AC.] (3.06%)
21. A WETLAND EVALUATION WAS CONDUCTED BY DUFFIELD ASSOCIATES IN MARCH 2021 AND NO WETLANDS WERE FOUND ON THE SITE. 60' 0 60' 120' EXISTING STORMWATER MANAGEMENT AREAS: 0 S.F. [0.0000 AC.]
22. ANY GAS FIRED HVAC EQUIPMENT MUST BE EQUIPPED WITH EMERGENCY CUT OFF SWITCHES REMOTELY LOCATED. EXISTING TOTAL: 163,347 S.F. [3.7499 AC.] (100.0%)
23. ADDRESS NUMBERS OF AT LEAST 12 INCHES IN HEIGHT MUST BE PLACED ON THE STREET SIDE OF THE BUILDING VISIBLE FROM THE DRAWING SCALE 1" = 60' PROPOSED BUILDINGS: 74,879 S.F. [1.7190 AC.] (45.84%)
STREET, 2 REQUIRED. PROPOSED OTHER IMPERVIOUS: 54,178 S.F. [1.2438 AC.] (33.17%)
PROPOSED OPEN SPACE: 34,290 S.F. [0.7872 AC.] (20.99%)
24. ANY NATURAL OR LP GAS BOTTLES, METERS, REGULATORS, ETC. MUST HAVE IMPACT PROTECTION. LEGEND PROPOSED STORMWATER MANAGEMENT AREAS: 0 S.F. [0.0000 AC.]
25. THIS SITE IS LOCATED WITHIN A SOURCE WATER PROTECTION OVERLAY ZONE (SWPOZ). RIGHT-OF-WAY LINE PROPOSED TOTAL: 163,347 S.F.[3.7499 AC.] (100.0%)
INDEX SHEET
PROPERTY LINE 13. GROSS FLOOR AREA: 144,173 GFA PARKING STRUCTURE
ADJACENT PROPERTY LINE 106,711 GFA COURTHOUSE
GOVERNMENTAL BOUNDARY LINE 250,884 GFA TOTAL
SHEET INDEX
BENCHMARK 14. PARKING RATIONALE: REQUIRED: 106,711 SF @ 1 SPACE PER 300 SF = 356 SPACES
C001 INDEX SHEET
CONCRETE MONUMENT FOUND PROPOSED: 495 P.S.
C101 EXISTING FEATURES / DEMOLITION PLAN CAPPED REBAR FOUND
C201 SITE PLAN IRON PIPE FOUND 15. BICYCLE PARKING: 1 SPACE PER 20 PARKING SPACES, 20 SPACES MAX
C301 UTILITY PLAN EASEMENT LINE (495 P.S. / 20 = 24.75) 20 SPACES REQUIRED, 20 PROVIDED
C401 GRADING PLAN SIGNS 16. SOURCE OF WATER: CITY OF DOVER
415 & 445 S GOVERNORS AVE
C601 PAVEMENT, SIGNAGE AND STRIPING PLAN ON-SITE CURB
C901-906 CONSTRUCTION DETAILS 17. SOURCE OF SEWER: CITY OF DOVER
L101-102 LANDSCAPE PLAN ON-SITE CONCRETE 18. SOURCE OF ELECTRIC: CITY OF DOVER
ON-SITE STRIPING 19. SOURCE OF GAS: CHESAPEAKE UTILITIES
OFF-SITE CURB
20. TRASH COLLECTION: PRIVATE CONTRACTOR
FIRE HYDRANT
PR. RIGHT-OF-WAY LINE
PR. PROPERTY LINE
PR. EASEMENT LINE
PR. BUILDINGS
PR. ON-SITE CURB
PR. ON-SITE CONCRETE
PR. ON-SITE STRIPING CERTIFICATION OF ACCURACY
FIRE HYDRANT
I, KENNETH JAMES TAYLOR, JR., P.E., HEREBY CERTIFY THAT I AM A REGISTERED PROFESSIONAL ENGINEER WITH
A BACKGROUND IN CIVIL ENGINEERING IN THE STATE OF DELAWARE, THAT THE INFORMATION SHOWN HERON
HAS BEEN PREPARED UNDER MY SUPERVISION AND TO THE BEST OF MY KNOWLEDGE AND BELIEF REPRESENTS
GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE.
__________________________________
DATE KENNETH JAMES TAYLOR, JR., P.E.
REGISTRATION #21140
DUFFIELD ASSOCIATES, LLC
CERTIFICATION OF ACCURACY
OWNER / DEVELOPER'S PLAN DEVELOPMEMENT APPROVAL
I, JOHN J. TRAYNOR III, P.L.S., HEREBY CERTIFY THAT I AM A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE
DATE: APRIL 1, 2022
STATE OF DELAWARE AND THAT THE BOUNDARY AND TOPOGRAPHIC INFORMATION ON THIS PLAN IS TRUE AND
I, JENNIFER COVERDALE, HEREBY CERTIFY THAT I AM THE OWNER OF THE PROPERTY DESCRIBED AND SHOWN
ON THIS PLAN, THAT THE PLAN WAS MADE AT MY DIRECTION, AND THAT I ACKNOWLEDGE THE SAME TO ME BY CORRECT TO THE ACCURACY REQUIRED BY ACCEPTED SURVEYING STANDARDS AND PRACTICES. SCALE: 1" = 60'
ACT AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN AND IN ACCORDANCE WITH ALL APPLICABLE LAWS AND
REGULATIONS.
__________________________________
PROJECT NO. 12598.CE
__________________________________ DATE JOHN J. TRAYNOR III, P.L.S.
DATE JENNIFER COVERDALE REGISTRATION #S6-0LS0507 SHEET: C001
THE STATE OF DELAWARE TRANSITION ENGINEERING SURVEYING, INC.
100
Page 101
Item 3.
OFFICES IN DELAWARE, MARYLAND,
WEB: HTTP://DUFFNET.COM
DUFFIELD ASSOCIATES Soil, Water & the Environment
SOIL DATE: LEGEND
5400 LIMESTONE ROAD
SYMBOL NAME RATING RIGHT-OF-WAY LINE
HkB HAMBROOK-URBAN LAND COMPLEX; B PROPERTY LINE
0-5 PERCENT SLOPES ADJACENT PROPERTY LINE
LOC
x
ZONING BOUNDARY LINE
WILMINGTON, DE 19808-1232
BENCHMARK
PENNSYLVANIA AND NEW JERSEY
CONCRETE MONUMENT FOUND
E-MAIL: DUFFIELD@DUFFNET.COM
CAPPED REBAR FOUND
LOC LOC LOC IRON PIPE FOUND
TEL. 302.239.6634
CONTOUR ELEVATION
SPOT ELEVATION
UTILITY POLE TO
BE RELOCATED BUILDINGS
LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
x x FENCES
FAX 302.239.8485
LOD
LOC SIGNS
BOLLARDS
CURB
LOD CONCRETE
LOD UTILITY POLE ON-SITE STRIPING
TO REMAIN. OFF-SITE SOLID STRIPING
LG-Lot1-Exist-12598CE
PROTECT IN OFF-SITE BROKEN STRIPING
P.E. #21140
KENNETH JAMES TAYLOR, JR., P.E.
CHECKED BY:
PLACE. OFF-SITE DASHED STRIPING
LOD
FILE NAME:
COMMUNICATION LINE
LOC COMMUNICATION MANHOLE
LOD
CABLE TELEVISION LINE
FIBER OPTIC LINE
TELEPHONE LINE KJT
4/1/2022
TELEPHONE MANHOLE
STATE: DELAWARE
LOD NATURAL GAS LINE
NATURAL GAS MANHOLE
LOD
DESIGNED BY:
OVERHEAD ELECTRIC LINE
DRAWN BY:
ELECTRIC POLE
UNDERGROUND ELECTRIC LINE
ELECTRIC MANHOLE
LOD LIGHT POLES
LOD
HVAC UNIT KJT AR
LOC SANITARY SEWER LINE
SANITARY SEWER MANHOLE
SANITARY SEWER FLOW ARROW CHK'D BY
SANITARY SEWER FORCE MAIN
LOD STORM DRAIN LINE DATE
LOD x x x x x x STORM MANHOLE
STORM DRAIN FLOW ARROW
LOC
LOD x STORM DRAIN INLET
STORM ROOF DRAIN
WATER MAIN
LOD
WATER VALVE
FIRE HYDRANT
x WATER MANHOLE
LOC
WATER WELL
LOD
MONITORING WELL
REVISION
BORINGS OR TEST PITS
LOD ON-SITE AREA TO BE
DEMOLISHED AND REMOVED
x LOD AREA OF PAVEMENT TO BE
MILLED
LOD LIMIT OF DISTURBANCE
LOD LOC LIMIT OF CONSTRUCTION
x x AREA OF PAVEMENT PATCH
LOD
LOD
LOD
No. - -
LOD
LOC
x
LOD
OWNER/ STATE OF DELAWARE
AREA OF 2" MILLING
LOD
DOVER, DE 19901
LOC
LOD
DEVELOPER: 540 S DUPONT HIGHWAY
x x x x
LOD
LOD
x
LOD
x
LOC LOD
x
LOD
EXISTING CONDITIONS / DEMOLITION PLAN
x
KENT COUNTY FAMILY COURT
LOD
LOC x
x
x
x LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
x x x x x x x x x x x x x x x
CITY OF DOVER ~ KENT COUNTY ~ DELAWARE
LOD
LOD
SITE DEVELOPMENT PLAN
x x x ALL EXISTING BUILDINGS, PARKING, UTILITIES,
LOD LOD LOD LOD
ETC. WITHIN THE BOUDNARY ARE TO BE
LOD RELOCATED OR DEMOLISHED AND REMOVED LO
UNLESS OTHERWISE SPECIFIED
D
LOD LOD
LOD
LOD LOD LOD
LOD
415 & 445 S GOVERNORS AVE
LOD
LOD
LOD
LOD
LOD
LOD
UTILITY POLE TO REMAIN
PROTECT IN PLACE
LOD
LO
D
LOD
D
LO
D
LO
LOD LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOC
LOC LOC LOC LOC LOC LOC
AREA OF 2" MILLING
LOC LOC LOC LOC
DATE: APRIL 1, 2022
LOC
SCALE: 1" = 30'
30' 0 30' 60' PROJECT NO. 12598.CE
DRAWING SCALE 1" = 30' SHEET: C101
LOC
101
Page 102
Item 3.
OFFICES IN DELAWARE, MARYLAND,
WEB: HTTP://DUFFNET.COM
DUFFIELD ASSOCIATES Soil, Water & the Environment
LEGEND
5400 LIMESTONE ROAD
RIGHT-OF-WAY LINE
PROPERTY LINE
x ADJACENT PROPERTY LINE
ZONING BOUNDARY LINE
WILMINGTON, DE 19808-1232
BENCHMARK
PENNSYLVANIA AND NEW JERSEY
CONCRETE MONUMENT FOUND
E-MAIL: DUFFIELD@DUFFNET.COM
CAPPED REBAR FOUND
IRON PIPE FOUND
TEL. 302.239.6634
BUILDINGS
R1
0' x x FENCES
PCC CURB SIGNS
R1 TYPE 1-8 BOLLARDS
FAX 302.239.8485
5' CURB
200.00' N74°03'32"E
10' BUILDING SETBACK PCC CURB
N16°10'46"W
116.55'
TYPE 1-6 CONCRETE
R15'
ON-SITE STRIPING
R5'
OFF-SITE SOLID STRIPING
R1 OFF-SITE BROKEN STRIPING
0'
OFF-SITE DASHED STRIPING
LG-Lot1-Site-12598CE
FIRE HYDRANT
P.E. #21140
KENNETH JAMES TAYLOR, JR., P.E.
PCC CURB
CHECKED BY:
24' PR. RIGHT-OF-WAY LINE
10' FRONT YARD SETBACK
R5 TYPE 1-6
FILE NAME:
' ' PR. PROPERTY LINE
BUS STOP
R5
TYPE 1
PR. BENCHMARK
CONC.MON.SET. PR. CONCRETE MONUMENT
CAPPED REBAR SET PR. CAPPED REBAR KJT
4/1/2022
R5 I.P.SET PR. IRON PIPE
STATE: DELAWARE
'
PR. BUILDING SETBACK LINE
PR. PAVING SETBACK LINE
DESIGNED BY:
' PR. EASEMENT LINE
DRAWN BY:
R5
30' REAR YARD SETBACK
PR. BUILDINGS
x x PR. FENCES
S16°14'05"E
PR. SIGNS
N73°32'50"E PR. BOLLARDS KJT AR
16.76' PR. CURB
R5
' PR. BRICK CHK'D BY
PR. CONCRETE DATE
x x x x x x
PR. ON-SITE STRIPING
x PR. OFF-SITE SOLID STRIPING
PROPOSED PARKING PR. OFF-SITE BROKEN STRIPING
PCC CURB 5-STORY STRUCTURE PR. OFF-SITE DASHED STRIPING
LIGHT POLES
TYPE 1-8 28,825 SF
(144,173 ± GFA FIRE HYDRANT
9' x S16°22'10"E
425 PARKING SPACES
61.25'
10 BICYCLE SPACES) 14
REVISION
24'
18' x N73°32'50"E
2.50'
'
R5 S16°22'10"E
20.00'
R
5'
S73°32'50"W
24' No.
20.00' - -
R1
0'
BIKE RACK - 10 SPACES x
(SEE DETAILS)
'
OWNER/
R5
115.84'
STATE OF DELAWARE
S16°22'10"E
30.00'
DOVER, DE 19901
R1
5 N73°32'50"E
DEVELOPER: 540 S DUPONT HIGHWAY
'
0.47'
R '
2 5 PCC CURB
24'
' TYPE 1-6
R25
0'
R2
26.6'
PEDESTRIAN BRIDGE
S16°14'05"E
TO SECOND FLOOR TRANSFORMER PAD
24.8' GENERATOR PAD 8' SHADOW FENCING
KENT COUNTY FAMILY COURT
(SEE DETAILS)
PCC CURB
TYPE 1-8 GUARDRAIL R10' BOLLARD, TYP. CHILLER PADS
PROPOSED RAMP
322.58' x x x x x x x x x N73°42'32"E
CITY OF DOVER ~ KENT COUNTY ~ DELAWARE
. 5'
R1
BIKE RACK - 10 SPACES
(SEE DETAILS)
15 18'
S16°26'44"E
9'
SITE DEVELOPMENT PLAN
x x R4. 75.30'
x x x 0'
R1 30' REAR YARD SETBACK
5'
R4
.5' .5'
R4
ON-SITE PCC CURB 24'
10' SIDE YARD SETBACK
TYPE 1-6, TYP. ' R4
11 R4
R4
.5' .5' R4
.5 .5
' 0'
R2
N73°38'38"E
5'
'
.5 R1 27.29'
R4 TRASH ENCLOSURE
SITE PLAN
24' (SEE ARCHITECTURAL) 4.5'
R R4 R
.5 R4 5'
4. 5
' .5 4.
'
' R
R4.5' 24'
PROPOSED FAMILY R2
98.01'
18' COURT BUILDING
'
5'
R1
43,620 SF 7 10 9 '
.5
415 & 445 S GOVERNORS AVE
24'
24' (106,711 ± GFA) R4
24'
R4
9' .5' R4.5'
18' 7 R4.5' R4.5'
' ' R4
.5 .5
18' ∆=19°36'42"' R4 R4
.5 '
R4
'
L=11.30'
24.2'
24' 9' 3
.5 R=33.00'
.5' R4 . R45'
R4
.5
R4 9' .5 R4 .5'
' '
S16°13'39"E
3
508.05'
9'
11 18' 9'
18' 12 24'
R4. 18'
15' FRONT YARD SETBACK 10' FRONT YARD SETBACK 5'
PCC CURB R35
S73°48'36"W TYPE 1-6 ' 544.04'
R4 '
0' 33 5'
R R2
R1
PCC CURB
5'
5' R1 PCC CURB
PCC CURB
TYPE 1-8 TYPE 1-6
TYPE 1-8
DATE: APRIL 1, 2022
SCALE: 1" = 30'
30' 0 30' 60' PROJECT NO. 12598.CE
DRAWING SCALE 1" = 30' SHEET: C201
102
Page 103
Item 3.
OFFICES IN DELAWARE, MARYLAND,
WEB: HTTP://DUFFNET.COM
DUFFIELD ASSOCIATES Soil, Water & the Environment
LOC 5400 LIMESTONE ROAD
x
WILMINGTON, DE 19808-1232
PENNSYLVANIA AND NEW JERSEY E-MAIL: DUFFIELD@DUFFNET.COM
LOC LOC LOC
TEL. 302.239.6634
LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
COMM
COMM LOD
FAX 302.239.8485
COMM COMM COMM COMM COMM COMM LOD
LOC CO
M COMM COMM COMM COMM COMM COMM
M MM
CO UE UE UE UE UE UE UE UE UE CO UE UE UE UE UE UE
MM MM
CO M M
CO LOD
UE PROP. LAWN LOD
PROP.
5-RGL LAWN
LG-Land-12598CE
COMM
R.L.A. #0285
CHECKED BY:
63-CXD
LOD
FILE NAME:
UE
LOC
PETER MOSCUFO, R.L.A.
LOD
45-CXD
AF
PMo
COMM
STATE: DELAWARE
UE
LOD
LOD
DESIGNED BY: DRAWN BY:
SD
UE 1-IXS
LOD COMM
PMo JJL
LOD
LOC 5-TLH
SD
UE CHK'D BY
1-IXS
LOD DATE
COMM LOD x x x x x x
1-RBM
5-TLH
LOC SD CCH
UE LOD
x
PROPOSED PARKING
PRELIMINARY
5-STORY STRUCTURE 1-IXS CCH
LOD 28,825 SF
x 18-RB
(144,173 ± GFA COMM SD
UE 5-TLH CCH x
LOC 425 PARKING SPACES LOD
NOT FOR
10 BICYCLE SPACES)
REVISION
x
CCH
LOD 1-IXS
SD
COMM x LOD
UE PROP. 6' HT. FENCE
CCH
CONSTRUCTION
PROP. LAWN 5-TLH
LOD 1-IXS SD
UE
AF
M
M LOD
O
SD C LOD
SD
UE LOD 83-CXD
No. - -
UE
COMM
UE 207-CXD
SD 45-CXD
LOD
LOC
7-TLH x
LOD 107-CXD AF
UE 7-TLH
SD
COMM
97-CXD SD
LOD
OWNER: STATE OF DELAWARE
800 BAY ROAD
LOC
LOD
UE
DOVER, DE 19901
SD SD SD SD SD SD SD SD SD
COMM
LOD
PHONE: (302) 760-2080
SS SS SS SS SS SS SS SS SS SS
SS
LOD UE
SD
UE UE UE UE UE UE
LOD
UE UE
COMM
8W 8W 8W 8W 8W 8W 8W SS
8W
UE
LOC LOD
SD
26.6'
CCH PROP. LAWN PEDESTRIAN BRIDGE
PROP. 3/8" TO 1/2" DELAWARE TO SECOND FLOOR 8W SS LOD TRANSFORMER PAD
UE
COMM
KENT COUNTY FAMILY COURTS
VALLEY RIVER STONE GENERATOR PAD
CCH
LOD PROP. LANDSCAPE EDGING
CONSTRUCTION IMPROVEMENT PLANS
LOC
EAST DOVER HUNDRED ~ KENT COUNTY ~ DELAWARE
SEASONAL ROTATIONS: SPRING = DAFFODILS (24"HT), BOLLARD, TYP. CHILLER PADS
CCH SUMMER AND FALL FLOWERING ANNUALS (24"HT) 8W SS
LOD x COMM LOD x LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
COMM x xCOMM x
173-CXD UE x x COMM x x
COMM COMM COMM COMM COMM COMM
COMM COMM
SD SD
LOD
SS SD x
LOD 6-RB
6-IGB UE UE UE UE UE UE UE UE UE
SD PROP. 6' HT. FENCE
1-RBM 45-RB x x
x x x x 8W SD SD SD SD UE
x
LOD xLOD x LOD x LOD x LODx x
LOD
SD SS
8W SS SS SS
LOD SS
LO
D
G G G G
LOD
LANDSCAPE PLAN
8W 8W 8W SD
UE UE UE UE UE UE UE
LOD SD LOD
GTS CCH G
LOD GTS GTS
3-IGB GTS
UE PROP. 6' HT. FENCE
LOD 3-NJT 4-CND
CCH UE
GTS
3-NJT LOD SD G LOD LOD
UNDERGROUND
PROPOSED FAMILY SD SWM FACILITY
LOD COURT BUILDING
RD RD
3,525 SF
UE
U UE UE GTS 6-IGB UE
LOD E UE 43,620 SF
SOUTH GOVERNORS AVENUE
SD G
LOD PROP. 6' HT. FENCE
(106,711 ± GFA) 1-RBM
SD CCH
GTS GTS SD
GTS GTS GTS GTS
UE LOD GTS
CCH G UE
SD
LOD GTS
xLOD
CCH SD GTS
3-NJT 12-IGB SD
SD
UE 3-IGB
3-NJT LOD 15-RB
LOD PROP. LAWN G UE SD
LOD SEASONAL ROTATIONS: SPRING = DAFFODILS (24"HT), x
SUMMER AND FALL FLOWERING ANNUALS (24"HT) PROP. LAWN SD SD SD SD LOD
3-IGB MV
UE G
UE UE SD
UE
UE LOD 3-CND 3-CND 6-CND SD GTS
UE SD UE UE UE 7-CND
UE x
LOD
D
LO
3-CND LOD
E
GTS U GTS LQR LQR LQR GTS GTS
MV CVS CVS CVS CVS CVS CVS CVS CVS CVS CVS UE RD 3-IGB G
D SD
LO
D
LO 5-IGB
LOC LOD LOD LOD LOD
3-CND LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
5-IGB 5-IGB 5-IGB 5-IGB LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
UE 3-IGB 8-IGB 3-IGB 7-IGB
LOC LOC
LOC LOC LOC LOC LOC
UE
LOC LOC LOC LOC LOC
DATE: APRIL 1, 2022
LOC LOC
SCALE: 1" = 30'
30' 0 30' 60' PROJECT NO. 12598.CE
DRAWING SCALE 1" = 30' SHEET: L101
LOC
103
Page 104
Item 3.
KENT COUNTY FAMILY COURTHOUSE
GOALS
REVITALIZE DOWNTOWN DOVER & ACTIVATE
LEGISLATIVE HALL CORNER OF GOVERNORS AVE AND WATER ST
EXISTING
FAMILY CENTRALIZE COURT SERVICES AND RESOURCES
LEGISLATIVE CENTRAL COURT
EASY ACCESS TO JUSTICE
GREEN PARK
PROVIDE FULL SERVICES FOR THE COMMUNITY
SAFE AND SECURE COURTHOUSE
THE GREEN KENT COUNTY
COURT HOUSE
S. G
OV
ERN ST. JONES RIVER
OR
SA
VEN
S T R EET
PROJECT
TER
SITE
UE A
W
View North at intersection of S. Governors Ave and Water Street View East at intersection of S. Governors Ave and Water Street View East at intersection of S. Governors Ave and Bank Street
104
Page 105
Item 3.
“Designing new construction on a historic site or in a
historic setting that it is compatible but differentiated from
the historic building or buldings”.
THE SECRETARY OF THE INTERIOR’S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES
105
Page 106
Item 3.
DEPT OF JUSTICE
JUDICAL
CHAMBERS
REMOTE
TESTIMONY
SE
BREAK
WOMEN'S
IT ELEC
MEN'S DE SE
DE
STANDARD FAMILY STANDARD FAMILY STANDARD FAMILY
COURTROOM STANDARD FAMILY
COURTROOM COURTROOM
COURTROOM
OFFICE OF THE
CHILD ADVOCATE
VEST VEST VEST VEST
DN
WAITING CHILD
WAITING
PE PE
LEVEL 3
TO SECURE
PARKING
JUDGE
ENTRY
JP OFFICES/
CHAMBERS
COMMISSIONERS'
CHAMBERS
VEST TRUANCY
COURTROOM
DN BULK
SE
STORAGE
AERIAL VIEW - FROM S GOVERNORS AVE JC
WOMEN'S ELEC
IT
REMOTE
MEN'S TESTIMONY
STANDARD FAMILY STANDARD FAMILY STANDARD FAMILY STANDARD FAMILY
COURTROOM COURTROOM COURTROOM COURTROOM
OPEN
OPEN
DN
UP
DN VEST VEST VEST VEST
WAITING CHILD
WAITING
PE PE
LEVEL 2
COUNT ADMIN
RECORDS
ROOM
PROCESSING
MEDIATION
SERVICE
DUMPSTERS ENTRY
SOUTH GOVERNORS AVENUE
UP
SE
FIRE PUMP LOADING AND
MAINTENANCE
MAINTENANCE MECH MECH
(PUMP ROOM)
EMERG MAIN
WOMEN'S
ELEC MDF ELEC ELEC
PUBLIC
ENTRY
MEN'S DE SE
CONTROL ROOM CENTRAL HOLDING
DE
UP
LOBBY
UP
SECURE
DCSS CHILD INC. ENTRY
DSCYF OFFICE OF
DEFENSE
SERVICES
BREAK
PE PE
WEST WATER STREET
LEVEL 1
AERIAL VIEW - FROM BANK LANE
106
Page 107
Item 3.
PROPOSED DESIGN - VIEW FROM INTERSECTION OF WATER STREET AND S GOVERNORS AVENUE
LOBBY ENTRY PROPOSED DESIGN TOWER CUPOLA PROPOSED DESIGN
- Multi-level plaza creates ceremonial entry to building - Symmetrical design with windows on four sides
-Black spindle railing reference back to historic cast and - Elaborate stepped profile cornice defines top of tower
rod iron throughout Dover
- Corner columns use similar language to other paired
- Paired brick columns with pre-cast concrete capitals add elements throughout facade
a dignified prominence to the lobby, and glazing between
provide ample natural light to the lobby - Clock face acts as civic marker
- Stepped pre-cast concrete cornice helps denote entry
and provide location for clear signage
- Adjacent parking structure uses similar materials to
create a campus feel along Governors Avenue
107
Page 108
Item 3.
PROPOSED DESIGN - SOUTH GOVERNORS AVENUE
GOVERNORS AVE PROPOSED DESIGN PROPOSED GOVERNORS AVE ENTRY
- Brick colonnade with pre-cast capitals flanked by two - Multi-level plaza creates ceremonial entry to building,
large glass panels create symmetry along facade with ramp providing barrier free access
- Large windows with gray infill panel at the floor slab -Black spindle railing reference back to historic cast and
contribute to the rhythm and vertical proportion of the rod iron throughout Dover
facade and enhance the civic imagery of the building
- Paired brick columns with pre-cast concrete capitals add
a dignified prominence to the lobby, and glazing between
provide ample natural light to the lobby
- Stepped pre-cast concrete cornice helps denote entry
and provide location for clear signage
VIEW OF PLAZA ON S GOVERNORS AVE
108
Page 109
Item 3.
VIEW ON WATER STREET
WATER STREET BAY WINDOW TOWER CUPOLA PROPOSED DESIGN
PROPOSED DESIGN
- Bay windows break up curtainwall along the courtroom - Symmetrical design with windows on four sides
corridor while allowing large amounts of natural light and
views for court users - Elaborate stepped profile cornice defines top of tower
- Bay windows reference back to smaller scale buildings - Corner columns use similar language to other paired
along The Green and throughout Dover elements throughout facade
- Large windows with gray infill panel within the bay - Clock face acts as civic marker
windows contribute to the rhythm and vertical proportion
of the facade
109
Page 110
Item 3.
VIEW OF PARKING GARAGE FROM SOUTH GOVERNORS AVENUE
PARKING GARAGE FROM S GOVERNORS AVE AND BANK LANE VIEW OF PARKING ENTRANCE FROM BANK LANE
110
Page 111
Item 3.
KENT COUNTY COURTHOUSE, DOVER, DELWARE FRANKLIN COUNTY COURTHOUSE, MASSACHUSETTS
SUPERIOR COURT, BRIDGEPORT, CONNECTICUT DELAWARE COUNTY COURTHOUSE, DELAWARE, OHIO RENFREW COUNTY COURTHOUSE, CANADA
111
Page 112
Item 3.
KENT COUNTY FAMILY COURTHOUSE
GOALS
REVITALIZE DOWNTOWN DOVER & ACTIVATE
LEGISLATIVE HALL CORNER OF GOVERNORS AVE AND WATER ST
EXISTING
FAMILY CENTRALIZE COURT SERVICES AND RESOURCES
LEGISLATIVE CENTRAL COURT
EASY ACCESS TO JUSTICE
GREEN PARK
PROVIDE FULL SERVICES FOR THE COMMUNITY
SAFE AND SECURE COURTHOUSE
THE GREEN KENT COUNTY
COURT HOUSE
S. G
OV
ERN ST. JONES RIVER
OR
SA
VEN
RS
TR E E T
PROJECT
TE
SITE
UE A
W
View North at intersection of S. Governors Ave and Water Street View East at intersection of S. Governors Ave and Water Street View East at intersection of S. Governors Ave and Bank Lane
NEW SITE PLAN MARCH 2022 KENT COUNTY FAMILY COURT
112
Page 113
Item 3.
Two Mill Road, Suite 210
Wilmington, Delaware 19806
302.984.1400
FAX 302.984.2957
F
158 W 27 Street Floor 10
New York, New York 10001
212.563.9154
ELEVATOR / ORNAMENTAL TOWER
ELEVATOR TOWER
TOWER ROOF
74' - 6"
ROOF SCREEN ELEVATOR ROOF
71' - 4" 5400 Limestone Rd.
Wilmington, Delaware 19808
STAIR TOWER ROOF 302.239.6634
66' - 6" T.O. ROOF SCREEN FAX 302.239.8485
65' - 0"
MAIN ROOF PARAPET
MAIN ROOF PARAPET
55' - 4"
1050 S. State St.
ROOF
Dover, Delaware 19901
51' - 4"
302.734.7400
E
7067 Columbia Gateway Drive, Suite 250
LEVEL 3 Columbia, MD 21046
33' - 4"
410.579.8100
T.O. PARAPET
18' - 0" 550 Township Line Rd, Suite 100
LEVEL 2 Blue Bell, PA 19244
15' - 4" 484.342.0200
LEVEL 1
0"
D AVERAGE GRADE
21' - 1"
TR
GRADE VARIES UE
0' - 62" to F.F.
PROJECT
1 COURTHOUSE SOUTH ELEVATION - WATER STREET
A203 Scale : 1/8" = 1'-0"
ELEVATOR / ORNAMENTAL
TOWER
ELEVATOR TOWER
TOWER ROOF
74' - 6"
ELEVATOR ROOF
STAIR TOWER 71' - 4"
The professional services of the architect are undertaken and performed in
the interest of STATE OF DELAWARE, OMB / DFM
_________________________________________________.
No contractual obligation is assumed by the architect for the benefit of any
ROOF SCREEN other person involved in the project.
C STAIR TOWER ROOF
66' - 6" PROJECT
T.O. ROOF SCREEN 19' - 2" DELAWARE FAMILY
65' - 0"
COURT - KENT
MAIN ROOF PARAPET
COUNTY
MAIN ROOF PARAPET
Project Address
55' - 4" Project City, Project State Project
4' - 0"
Zip
ROOF
51' - 4"
OWNER
STATE OF
18' - 0" DELAWARE, OMB /
DFM
THOMAS COLLINS BUILDING
PARKING GARAGE ACCESS 540 S. DUPONT HIGHWAY, SUITE 1
ROOF OF BRIDGE LEVEL 3
33' - 4" 33' - 4"
DOVER, DELAWARE 19901
55' - 4"
18' - 0" KENT COUNTY
B FAMILY COURTROOM
BUILDING
BOTTOM OF BRIDGE LEVEL 2
15' - 4" 15' - 4"
15' - 4"
OPEN TO BEYOND
Project Status
LEVEL 1
0"
NOTE: THESE DRAWINGS ARE
CONFIDENTIAL FOR OFFICIAL USE ONLY,
NOT FOR PUBLIC DISTRIBUTION. A
AVERAGE GRADE DETERMINATION HAS BEEN MADE THAT
21' - 1" THE PUBLICATION OF THESE PLANS
COULD COMPROMISE PUBLIC SAFETY AND
GRADE VARIES ARE NOT AVAILABLE PURSUANT TO
0' - 62" to F.F. DELAWARE CODE, TITLE 29, §10002 (I)(17)
3 WEST ELEVATION_ (a)(2) AND (3).
A203 Scale : 1/8" = 1'-0"
ISSUED FOR
NO. DATE DESCRIPTION
A
Date 10/22/2021
Scale 1/8" = 1'-0"
Drawn Author
Checked Checker
Approved Approver
Project Project Number
1 2 3 4 5 6 7
© 2021 TEVEBAUGH ARCHITECTURE
Sheet A203 113
Page 114
Item 3.
Two Mill Road, Suite 210
Wilmington, Delaware 19806
302.984.1400
FAX 302.984.2957
F
158 W 27 Street Floor 10
New York, New York 10001
212.563.9154
ELEVATOR / ORNAMENT TOWER
ELEVATOR TOWER
TOWER ROOF
ROOF SCREEN STAIRWAR TOWER 74' - 6"
ELEVATOR ROOF
71' - 4" 5400 Limestone Rd.
Wilmington, Delaware 19808
302.239.6634
STAIR TOWER ROOF
FAX 302.239.8485
T.O. ROOF SCREEN 66' - 6"
65' - 0" MAIN ROOF PARAPET
MAIN ROOF PARAPET
55' - 4"
4' - 0"
1050 S. State St.
ROOF Dover, Delaware 19901
51' - 4" 302.734.7400
E
18' - 0"
7067 Columbia Gateway Drive, Suite 250
LEVEL 3 Columbia, MD 21046
33' - 4" 410.579.8100
PARKING GARAGE 55' - 4"
ACCESS
18' - 0"
550 Township Line Rd, Suite 100
Blue Bell, PA 19244
LEVEL 2
15' - 4" 484.342.0200
15' - 4"
LEVEL 1
0"
D AVERAGE GRADE
21' - 1" TR
UE
GRADE VARIES
0' - 62" to F.F. PROJECT
2 NORTH ELEVATION_
A204 Scale : 1/8" = 1'-0"
ELEVATOR / ORNAMENT
TOWER ELEVATOR TOWER
TOWER ROOF
74' - 6"
STAIR TOWER
ROOF SCREEN ELEVATOR ROOF The professional services of the architect are undertaken and performed in
71' - 4" the interest of STATE OF DELAWARE, OMB / DFM
_________________________________________________.
No contractual obligation is assumed by the architect for the benefit of any
other person involved in the project.
C STAIR TOWER ROOF PROJECT
66' - 6"
T.O. ROOF SCREEN DELAWARE FAMILY
65' - 0"
MAIN ROOF PARAPET
COURT - KENT
COUNTY
Project Address
MAIN ROOF PARAPET
55' - 4"
Project City, Project State Project
Zip
ROOF
51' - 4"
OWNER
STATE OF
18' - 0" DELAWARE, OMB /
DFM
THOMAS COLLINS BUILDING
PARKING GARAGE ACCESS 540 S. DUPONT HIGHWAY, SUITE 1
LEVEL 3 DOVER, DELAWARE 19901
33' - 4"
55' - 4"
18' - 0"
KENT COUNTY
B FAMILY COURTROOM
T.O. PARAPET
BUILDING
18' - 0"
LEVEL 2
15' - 4"
15' - 4"
OPEN TO BEYOND
Project Status
LEVEL 1
0"
AVERAGE GRADE
NOTE: THESE DRAWINGS ARE
21' - 1" CONFIDENTIAL FOR OFFICIAL USE ONLY,
NOT FOR PUBLIC DISTRIBUTION. A
GRADE VARIES
DETERMINATION HAS BEEN MADE THAT
0' - 62" to F.F. THE PUBLICATION OF THESE PLANS
COULD COMPROMISE PUBLIC SAFETY AND
ARE NOT AVAILABLE PURSUANT TO
DELAWARE CODE, TITLE 29, §10002 (I)(17)
(a)(2) AND (3).
ISSUED FOR
1 EAST ELEVATION_ NO. DATE DESCRIPTION
A204 Scale : 1/8" = 1'-0"
A
Date 10/22/2021
Scale 1/8" = 1'-0"
Drawn Author
Checked Checker
Approved Approver
Project Project Number
1 2 3 4 5 6 7
© 2021 TEVEBAUGH ARCHITECTURE
Sheet A204 114
Page 115
Item 3.
Two Mill Road, Suite 210
Wilmington, Delaware 19806
302.984.1400
FAX 302.984.2957
TOP OF STAIR TOWER TOP OF STAIR TOWER
8' - 5 7/8" 8' - 5 7/8"
F
TOP ROOF TOP ROOF 158 W 27 Street Floor 10
New York, New York 10001
56' - 10" 56' - 10" 212.563.9154
7' - 5" 7' - 5"
TOP TIER TOP TIER
19' - 8" 19' - 8"
10' - 8" 10' - 8"
FOURTH TIER 5400 Limestone Rd.
FOURTH TIER
Wilmington, Delaware 19808
18' - 0" 18' - 0" 302.239.6634
62' - 6 7/8"
FAX 302.239.8485
10' - 8" 10' - 8" 62' - 6 7/8"
THIRD TIER THIRD TIER
PARKING GARAGE
ACCESS
16' - 4" 16' - 4"
11' - 4" 11' - 4"
1050 S. State St.
Dover, Delaware 19901
302.734.7400
SECOND TIER SECOND TIER
14' - 0" 14' - 0"
E
14' - 0" 14' - 0"
7067 Columbia Gateway Drive, Suite 250
GROUND LEVEL GROUND LEVEL Columbia, MD 21046
410.579.8100
28' - 9" 28' - 9"
3 BACK GARAGE 4 FRONT GARAGE
A205 Scale : 1/8" = 1'-0" A205 Scale : 1/8" = 1'-0"
550 Township Line Rd, Suite 100
Blue Bell, PA 19244
484.342.0200
TOP OF STAIR TOWER
TOP OF STAIR TOWER
PROJECT
8' - 5 7/8"
D
TR
TOP ROOF UE
56' - 10"
7' - 5"
TOP TIER
19' - 8"
10' - 8"
FOURTH TIER
18' - 0"
10' - 8" 62' - 6 7/8"
THIRD TIER
16' - 4"
11' - 4"
SECOND TIER The professional services of the architect are undertaken and performed in
the interest of STATE OF DELAWARE, OMB / DFM
_________________________________________________.
14' - 0" No contractual obligation is assumed by the architect for the benefit of any
other person involved in the project.
C
PROJECT
14' - 0"
DELAWARE FAMILY
COURT - KENT
COUNTY
GROUND LEVEL
Project Address
28' - 9" Project City, Project State Project
Zip
OWNER
5 LEFT GARAGE
STATE OF
A205 Scale : 1/8" = 1'-0" DELAWARE, OMB /
DFM
THOMAS COLLINS BUILDING
TOP OF STAIR TOWER TOP OF STAIR TOWER 540 S. DUPONT HIGHWAY, SUITE 1
DOVER, DELAWARE 19901
TOP OF ELEVATOR TOWER
8' - 5 7/8"
TOP ROOF
56' - 10" KENT COUNTY
B 7' - 5"
FAMILY COURTROOM
TOP TIER - GARAGE
19' - 8"
10' - 8"
FOURTH TIER
18' - 0"
Project Status
10' - 8" 62' - 6 7/8"
THIRD TIER
NOTE: THESE DRAWINGS ARE
16' - 4" CONFIDENTIAL FOR OFFICIAL USE ONLY,
NOT FOR PUBLIC DISTRIBUTION. A
DETERMINATION HAS BEEN MADE THAT
11' - 4"
THE PUBLICATION OF THESE PLANS
COULD COMPROMISE PUBLIC SAFETY AND
ARE NOT AVAILABLE PURSUANT TO
DELAWARE CODE, TITLE 29, §10002 (I)(17)
(a)(2) AND (3).
SECOND TIER
14' - 0" ISSUED FOR
NO. DATE DESCRIPTION
14' - 0"
A
GROUND LEVEL
28' - 9"
Date 10/22/2021
6 Scale 1/8" = 1'-0"
RIGHT GARAGE
Scale : 1/8" = 1'-0" Drawn Author
A205 Checked Checker
Approved Approver
Project Project Number
1 2 3 4 5 6 7
© 2021 TEVEBAUGH ARCHITECTURE
Sheet A205 115
Page 116
Item 3.
Two Mill Road, Suite 210
Wilmington, Delaware 19806
302.984.1400
FAX 302.984.2957
TOWER ROOF ELEVATOR / ORNAMENT
74' - 6" TOWER ELEVATOR TOWER
F ELEVATOR ROOF STAIR TOWER
STAIR TOWER ROOF
ROOF SCREEN 66' - 6"
71' - 4" TOP OF STAIR TOWER 158 W 27 Street Floor 10
T.O. ROOF SCREEN TOP OF STAIR TOWER New York, New York 10001
65' - 0" 212.563.9154
MAIN ROOF PARAPET
TOP ROOF
MAIN ROOF PARAPET
56' - 10"
55' - 4"
ROOF
51' - 4" TOP TIER
19' - 8"
FOURTH TIER
18' - 0"
LEVEL 3 5400 Limestone Rd.
33' - 4"
THIRD TIER Wilmington, Delaware 19808
302.239.6634
16' - 4"
FAX 302.239.8485
T.O. PARAPET SECOND TIER
18' - 0"
14' - 0"
LEVEL 2
15' - 4"
GROUND LEVEL
LEVEL 1 28' - 9"
0" 1050 S. State St.
Dover, Delaware 19901
302.734.7400
1 EAST ELEVATION__
A206 Scale : 1/16" = 1'-0"
E
7067 Columbia Gateway Drive, Suite 250
Columbia, MD 21046
410.579.8100
550 Township Line Rd, Suite 100
Blue Bell, PA 19244
ELEVATOR / ORNAMENTAL TOWER 484.342.0200
STAIR TOWER
TOWER ROOF
74' - 6"
MAIN ROOF PARAPET
TOP OF STAIR TOWER ROOF SCREEN ELEVATOR ROOF
TOP OF STAIR TOWER T.O. ROOF SCREEN 71' - 4"
65' - 0"
MAIN ROOF PARAPET
TOP ROOF 55' - 4"
56' - 10"
ROOF
TOP TIER 51' - 4" PROJECT
D 19' - 8"
TR
UE
FOURTH TIER
18' - 0"
LEVEL 3
33' - 4"
55' - 4"
THIRD TIER
16' - 4"
SECOND TIER
LEVEL 2
14' - 0" 15' - 4"
GROUND LEVEL
28' - 9" LEVEL 1
0"
5 WEST ELEVATION__
A206 Scale : 1/16" = 1'-0"
The professional services of the architect are undertaken and performed in
the interest of STATE OF DELAWARE, OMB / DFM
_________________________________________________.
No contractual obligation is assumed by the architect for the benefit of any
other person involved in the project.
C
PROJECT
DELAWARE FAMILY
COURT - KENT
COUNTY
Project Address
Project City, Project State Project
Zip
OWNER
STATE OF
DELAWARE, OMB /
DFM
THOMAS COLLINS BUILDING
ELEVATOR / ORNAMENTAL TOWER 540 S. DUPONT HIGHWAY, SUITE 1
ELEVATOR TOWER DOVER, DELAWARE 19901
TOWER ROOF
74' - 6" ROOF SCREEN ELEVATOR ROOF
71' - 4"
STAIR TOWER ROOF
66' - 6" T.O. ROOF SCREEN
65' - 0"
MAIN ROOF PARAPET
MAIN ROOF PARAPET
KENT COUNTY
B 55' - 4"
ROOF FAMILY COURTROOM
51' - 4"
- ELEVATIONS
LEVEL 3
33' - 4"
LEVEL 2
T.O. PARAPET
18' - 0"
Project Status
15' - 4"
NOTE: THESE DRAWINGS ARE
LEVEL 1 CONFIDENTIAL FOR OFFICIAL USE ONLY,
0" NOT FOR PUBLIC DISTRIBUTION. A
DETERMINATION HAS BEEN MADE THAT
THE PUBLICATION OF THESE PLANS
COULD COMPROMISE PUBLIC SAFETY AND
ARE NOT AVAILABLE PURSUANT TO
DELAWARE CODE, TITLE 29, §10002 (I)(17)
(a)(2) AND (3).
ISSUED FOR
NO. DATE DESCRIPTION
2 COURTHOUSE SOUTH ELEVATION - WATER STREET__
A206 Scale : 1/16" = 1'-0"
A
Date 10/22/2021
Scale 1/16" = 1'-0"
Drawn Author
Checked Checker
Approved Approver
Project Project Number
1 2 3 4 5 6 7
© 2021 TEVEBAUGH ARCHITECTURE
Sheet A206 116
Page 118
Item 4.
City of Dover
DATA SHEET FOR SITE DEVELOPMENT PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF May 4, 2022
PLANNING COMMISSION MEETING OF May 16, 2022
Plan Title: Parking Lot at 446 S. Governors Avenue
S-22-07
Plan Type: Site Development Plan
Owners of Record: State of Delaware
Location: West side of South Governors Avenue, north of West Water Street
Address: 446 South Governors Avenue
Tax Parcel: ED-05-077.09-03-21.00-000
Site Area: 0.4989 +/- acres (21,733 SF)
Zoning: C-2A (Limited Central Commercial Zone)
SWPOZ (Source Water Protection Overlay Zone)
Existing Use: Vacant Commercial Building (To be demolished)
Proposed Use: Parking Lot
Impervious Areas: Existing – 97.8%
Proposed – 76.63%
Off Street Parking: Existing – undetermined
Required – 0 (Proposed Parking Lot is Accessory to proposed Courthouse)
Proposed – 45 parking spaces (10 bicycle parking)
Waiver Requests: None
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 118
Page 119
Item 4.
City of
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: May 4, 2022
APPLICATION: Parking Lot at 446 South Governors Avenue, Dover, DE
FILE #: S-22-07 REVIEWING AGENCY: City of Dover Planning Office
CONTACT: Julian Swierczek AICP, Planner II PHONE #: (302) 736-7196
I. PLAN SUMMARY
This is a review of a Site Plan application to permit the construction of a 45-vehicle Parking Lot
to serve the proposed Kent County Family Court. This Parking Lot is in addition to the proposed
Parking Garage facility proposed for the Kent County Family Courthouse. The site consists of a
parcel of land consisting of a total of 0.4989 +/- acres. The property is zoned C-2A (Limited
Central Commercial Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone).
The property is located on the west side of South Governors Avenue, north of West Water Street.
The owner of record is the State of Delaware. Property Address: 446 S. Governors Avenue. Tax
Parcel: ED-05-077.09-03-21.00-000. Council District 4.
II. PROJECT DESCRIPTION
The subject Site Development Plan Application is related to Site Development Plan Application
S-22-06 New Courthouse to serve as the Kent County Family Court. Specifically, this
Application S-22-07 is to provide an Annex Parking Lot for 45-vehicle parking spaces for the
primary use of the Courthouse. It is noted by Planning Staff that parking lots are listed as a
Conditional Use within the C-2A (Limited Central Commercial Zone). However, the subject
Parking Lot is associated with the overall New Courthouse Project across South Governors
Avenue to the east, and subsequently is accessory to the Courthouse as opposed to a standalone
parking lot.
The site was most recently the location of the Box Outlet, a retail store in the commercial
buildings. The building is proposed for demolition under Demolition Permit #22-182. The
property subject to the present Site Plan is bound on the south by West Water Street, on the east
by South Governors Avenue, and on the west by Shotgun Alley. The Plan shows that forty-five
(45) vehicle parking spaces are proposed.
III. ZONING REVIEW
Request for C-2A (Limited Central Commercial Zone) Zoning
The proposed use is classified as a Parking Lot which is an allowable use in the C-2A Zone. The
following description of the C-2A zoning district is provided from Article 3 §14 of the Zoning
Ordinance.
119
Page 120
Item 4.
S-22-07 Parking Lot at 446 South Governors Avenue
DAC Report of May 4, 2022
Page 3 of 7
Article 3 Section 14. – Limited Central Commercial Zone (C-2A).
14.1 Uses permitted. No building or premises shall be used and no building or part of a building shall
be erected, which is arranged, intended or designed to be used, in whole or in part, for any purpose,
except the following:
(a) Retail Stores
(b) Business, professional or government offices
(c) Personal service establishments.
(d) Restaurants.
(e) Service establishments.
(f) Hotels.
(g) Places of public assembly.
(h) Drive-throughs.
(i) One family residences, including attached and semi-detached dwellings, complying with
the bulk standards of the RG-1 (General Residence) zone.
(j) Apartments and multi-family dwellings
14.2 Conditional Uses. The following uses are permitted, conditional upon the approval of the
planning commission in accordance with the procedures and subject to the general conditions set
forth in article 10, section 1:
(a) Parking lots and parking structures as a principal use on suitably landscaped lots.
(b) Fuel pumps accessory to a permitted use.
14.3 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off
street parking, shall be carried on in buildings fully enclosed on all sides, except for outdoor
eating areas associated with restaurants and outdoor sales areas approved by the city planner.
14.4 Performance standards. All uses are subject to performance standards as set forth in article
5, section 8.1.
14.5 Site development plan approval. Site development plan approval in accordance with article
10, section 2 hereof shall be required prior to the issuance of building permits for the erection or
enlargement of all structures and prior to the issuance of certificates of occupancy for any change
of use.
SWPOZ (Source Water Protection Overlay Zone)
The site is also within the Source Water Protection Overlay Zone (SWPOZ). The purpose of the
SWPOZ is to establish additional standards and requirements for property within the zone
including the prohibition of certain uses and limitations on impervious surfaces, ground cover,
and floor area ratios in order to protect, to maintain, and to minimize contamination of drinking
water supplies held in groundwater aquifers. Tier 3 areas of the SWPOZ are known as Excellent
Recharge Areas. However, given the location of the property in the Downtown Redevelopment
Target Area it is exempt from the SWPOZ requirements per Article 3 Section 29.79. See City of
Dover Zoning Ordinance Article 3 Section 29 for more details on the SWPOZ.
However, with the redevelopment of this parcel, the project will reduce the impervious surface
on the site from 97.8% to 76.63% (a reduction of 21.17%). This is accomplished by the
120
Page 121
Item 4.
S-22-07 Parking Lot at 446 South Governors Avenue
DAC Report of May 4, 2022
Page 4 of 7
implementation of grass/ landscaped areas around the periphery of the site as well as in the island
central to the overall Parking Lot area.
IV. PARKING SUMMARY
The Zoning Ordinance, Article 5 Section 4.14 requires vehicle parking to be provided at a rate of
one parking space per 300 SF of floor area. However, this proposed Parking Lot is associated
with New Courthouse subject to Site Development Plan Application S-22-06, which is proposed
at 106,711 GFA. This would require 356 total vehicle parking space to be provided for the
Courthouse. The vehicle parking spaces proposed for this Parking Lot, as well as those located
on the site of the new Courthouse combined are 540 vehicle parking spaces.
This subject Parking Lot proposal specifically shows forty-five (45) vehicle parking spaces.
These are accessed via 24-foot-wide drive-aisles which themselves connect to two (2) site
entrances. One site entrance is a one-in/one-out entrance off South Governors Avenue, and the
second is a shared entrance to the Shotgun Alley located to the west of the parking lot.
There are no ADA parking spaces shown on this lot. However, it is again noted that the bulk of
vehicle parking for the proposed Courthouse is shown on the actual Courthouse site. Vehicle
parking on the Courthouse site would be closer to the proposed building where ADA-compliant
vehicle parking spaces would be more beneficial for Courthouse use. Planning Staff would
however still consider it beneficial to provide at least one (1) ADA compliant parking space
within this Parking Lot.
Bicycle Parking
The site is required to provide bicycle parking. The bicycle parking calculation is one for every
twenty parking spaces or fraction thereof. With 45 vehicle parking spaces specific to this subject
Parking Lot, a minimum of three (3) bicycle parking spaces are required. The Cover Sheet
submitted notes three (3) spaces are to be provided; however, the Site Plan Drawing shows ten
(10) bicycle parking spaces are to be provided. There are also bicycle parking spaces to be
provided on the Courthouse site as well.
V. SITE CONSIDERATIONS
Lighting
The Site Plan does appear to indicate the locations of proposed lighting features on the site.
There appear to be eight (8) light poles proposed. Five (5) light poles are shown around the
periphery of the site, including along the alley. The remaining three (3) light poles are located
within the central island of the Parking Lot.
Sidewalks
There is existing street frontage sidewalk serving the site along both the South Governors
Avenue and West Water Street frontages. There is no sidewalk along Shotgun Alley. There is
however no dedicated sidewalk connection from either road frontage, nor is there a sidewalk
connection to the bicycle parking area shown at the northeast of the site along the Governors
Avenue frontage. Sidewalks should be included to provide dedicated pedestrian access onto the
site from the South Governors Avenue and West Water Street frontages, as well as from the
sidewalk along Governors Avenue to the bicycle parking area.
121
Page 122
Item 4.
S-22-07 Parking Lot at 446 South Governors Avenue
DAC Report of May 4, 2022
Page 5 of 7
VI. TREE PLANTING AND LANDSCAPE PLAN
The submitted Site Plan contains information for elements of as a Landscape Plan. The tree
planting requirement is based on the total lot area and one (1) tree is required for every 3,000
S.F. of land area. This project site consists of a total lot area of 0.4989 +/- acres (21,733 SF);
therefore, eight (8) trees are required. The applicant proposes to eight (8) Skyline Honey Locust
trees on site. The plans show two (2) are planned along the South Governors Avenue frontage,
two (2) along the West Water Street frontage, and the remaining four (4) are shown in the central
island of the Parking Lot.
Opaque Barrier
The Zoning Ordinance requires a buffer between a residential use and a non-residential use
(Article 5 Section 7.2). The buffer has two components: an opaque barrier consisting of a
wooden fence, a masonry wall or an earthen berm and a landscape component. The property
immediately adjacent to the north of the subject site is similarly zoned C-2A but appears to be of
a residential use. An Opaque Barrier buffer would therefore be required along the north property
line of the parcel. The Plan submitted does appear to show shrubbery providing screening along
the northern property line and a proposed fence.
According to Zoning Ordinance, Article 5 §7.24, the Planning Commission can consider a
waiver request to eliminate the opaque barrier (fence component) and require only landscaping
in cases where noise is not a concern, and the vegetation alone is considered a desirable aesthetic
alternative. The applicant has chosen not to pursue a waiver request and will implement the
Opaque Barrier requirements.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
VII. CITY AND STATE CODE REQUIREMENTS:
1) Ensure implementation of the Opaque Barrier (fence, wall, or berm) portion of the buffer and
the continuous 6-foot-tall landscape component shall be planted along all residential use
boundaries. The Opaque Barrier is not required in the front yard setback of 15 feet and if a
fence is placed in the front yard setback it is limited to 4 feet in height.
2) Ensure that at least one parking space is ADA compliant.
3) Ensure that there is a pedestrian connection between the parking lot and the South Governors
Avenue and West Water Street frontages.
4) Note the footcandles of the lighting proposed.
5) Note if any trash collection is proposed on site.
6) The applicant must receive approval for all stormwater management and erosion/sediment
control plans.
122
Page 123
Item 4.
S-22-07 Parking Lot at 446 South Governors Avenue
DAC Report of May 4, 2022
Page 6 of 7
7) Corrections to Sheet C001:
a) In the Data column:
i) Add the total proposed Impervious Lot Coverage in both square feet and as a
percentage.
ii) Provide Existing parking figures.
iii) For Zoning, note the SWPOZ (Source Water Protection Overlay Zone: Tier 3,
Excellent Recharge Area)
iv) Note Bulk Standards for the SWPOZ Zone.
b) Provide a 1=1,200 Scale Map.
c) Provide square footage of the proposed parking lot, as well as impervious surface area
overall.
d) Add a note indicating that any new utilities to be constructed on the site shall be
constructed at the expense of the developer.
VIII. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO
MEET CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 the Planning Commission in considering
and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so
that the public health, safety, and welfare, the comfort and convenience of the public in general,
and the residents of the immediate neighborhood in particular shall be taken into consideration.
These safeguards may to the maximum extent possible further the expressed intent of the Zoning
Ordinance and the accomplishment of stated objectives.
1) Pedestrian Connectivity: Staff recommends that a dedicated, paved access to the bicycle
parking area should be provided connecting to the sidewalk along South Governors Avenue.
Also recommended is the addition of sidewalk into the Parking Lot from the street frontage
sidewalk system; this could be implemented near the corner intersection of South Governors
Avenue and West Water Street.
IX. ADVISORY COMMENTS TO THE APPLICANT:
1) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
2) Following Planning Commission approval of the Site Plan, the Plan must be revised to meet
all conditions of approval from the Development Advisory Committee or as otherwise noted.
A Check Print must be submitted for review by Planning Office Staff and directly to other
agencies. Upon determination that the Plan is complete and all agency approvals have been
received, copies of the Plan may be submitted for final endorsement.
3) In the event, that major changes and revisions to the Site Development Plan occur in the
finalization of the Site Plan contact the Planning Office. Examples include relocation of site
components. These changes may require resubmittal for review by the Development
Advisory Committee, Planning Commission, or other agencies and commissions making
recommendations in regards to the plan.
123
Page 124
Item 4.
S-22-07 Parking Lot at 446 South Governors Avenue
DAC Report of May 4, 2022
Page 7 of 7
4) For construction, the requirements of the building code or fire code must be complied with.
Consult with the Chief Building Inspector and City of Dover Fire Marshal for these
requirements.
5) The applicant/developer shall be aware that prior to any ground disturbing activities on the
site the appropriate site inspections, Pre-Construction meetings (including a City of Dover
Pre-Construction meeting), and permits are required.
6) Construction may have an effect on the adjacent property owners and nearby travel lanes.
Any work requiring the closing or rerouting of potential customers or visitors to adjacent
properties should be coordinated as to offer the least amount of inconvenience to the adjacent
property owners.
7) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or building
identification sign shall require a Sign Permit from the City of Dover prior to placement of
any such sign.
8) The applicant shall be aware that Site Plan approval does not represent a Building Permit and
associated construction activity permits. A separate application process is required for
issuance of a Building Permit from the City of Dover and will be required to track
construction of this Parking Lot.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
124
Page 125
Item 4.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: APRIL 27, 2022
APPLICATION: Parking Lot at 446 South Governors Avenue
FILE #: S-22-07
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater
CONTACT PHONE #: 302-736-7025
CONTACT PHONE #: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. None.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District / DNREC is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our
office.
WATER
1. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with
the City of Dover Department of Water & Wastewater specifications and requirements. Please locate on the plans
2. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
WASTEWATER
1. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements. Please locate on the
plans.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and
invert elevations must be labeled on all sanitary structures.
125
Page 126
Item 4.
Parking Lot at 446 South Governors Avenue
File #: S-22-07
April 27, 2022
Page 2 of 2
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This
must be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
STREETS / SANITATION / STORMWATER / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER / WASTEWATER
1. None
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission
Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
STORMWATER
1. Please be advised that this area is prone to flooding and the City is recommending over management on the site prior to the
connection to the City’s stormwater system.
STORMWATER / STREETS
1. None
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
126
Page 127
Item 4.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: APRIL 27, 2022
APPLICATION: Parking Lot at 446 South Governors Avenue
FILE #: S-22-07
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Operations Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all existing underground electric, communications and water facilities.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
127
Page 128
Item 4.
Parking Lot at 446 South Governors Avenue
File #: S-22-07
Apr 27, 2022
Page 2 of 2
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. Provide load sheets if the new load requirements will change as soon as possible to verify proper sizing of transformers
and creation of primary fee estimates. Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
128
Page 129
C F
S-22-07
Item 4.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 04/27/22 D S
O H
V A
E L
R
APPLICATION: Parking Lot at 446 South Governors Ave
FILE #: S-22-07 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposal is a parking lot, this office has no objections
2. Project to be completed per approved Site Plan.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. N/A
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
129
Page 130
Item 4.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: Parking Lot at 446 South Governors Avenue
FILE#: S-22-07 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Ryan Schroder PHONE#: 302-760-2674
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. This project and the New Courthouse at South Governors Avenue and West Water Street
(S-22-06) are being reviewed as one project by DelDOT under the name Kent County
Delaware Family Courts
130
Page 131
Item 4.
DEPARTMENT OF NATURAL RESOURCES AND
ENVIRONMENTAL CONTROL
DIVISION OF WATERSHED STEWARDSHIP
CONSERVATION PROGRAMS ENTERPRISE BUSINESS PARK PHONE: (302) 739-9921
SECTION 285 BEISER BOULEVARD, SUITE 102 FAX: (302) 739-6724
DOVER, DELAWARE 19904
MEMORANDUM
TO: Dawn Melson-Williams
City of Dover Planning Office
FROM: Elaine Z. Webb, P.E.
DNREC Sediment and Stormwater Program
DATE: April 27, 2022
SUBJECT: City of Dover Development Advisory Committee Comments
S-22-06 New Courthouse at South Governors Avenue and West Water Street
S-22-07 Parking Lot at 446 South Governors Avenue
CC: Bonnie Arvay, Program Manager II, Sediment and Stormwater Program
DNREC Sediment and Stormwater Program has reviewed the D.A.C. application for the above reference
projects and offers the following comments:
S-22-06 New Courthouse at South Governors Avenue and West Water Street
1. A Sediment and Stormwater Management Plan must be approved by DNREC Sediment and
Stormwater Program prior to any land disturbance taking place on site.
a. DNREC Sediment and Stormwater Program has had preliminary meetings with the owner
and consultant regarding stormwater compliance for the site.
b. The site will comply with Resource Protection Event (RPv, 1-yr storm) requirements through
implementation of a remediation plan.
c. Conveyance (Cv, 10-yr storm) and Flooding (Fv, 100-year storm) event compliance must be
met for the project. An underground stormwater storage facility is proposed.
d. Due to the contamination on site a Contaminated Materials Management Plan (CMMP) must
be adhered throughout construction of the project.
2. A Sediment and Stormwater Plan for the demolition phase of the project is currently under review.
The demolition plan includes the total area of applications S-22-06 and S-22-07. It is expected that
both of the City of Dover DAC applications will be submitted to DNREC as a single Sediment and
Stormwater Plan for the redevelopment phase.
131
Page 132
Item 4.
S-22-06 and S-22-07 DAC Comments
April 27, 2022
Page 2 of 2
3. A Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity has been
submitted that includes the total area of applications S-22-06 and S-22-07. This NOI Permit No.
6692 will continue through the construction phase for both applications until project closeout.
S-22-07 Parking Lot at 446 South Governors Avenue
1. A Sediment and Stormwater Management Plan must be approved by DNREC Sediment and
Stormwater Program prior to any land disturbance taking place on site. Regarding stormwater
management compliance:
a. DNREC Sediment and Stormwater Program has had preliminary meetings with the owner
and consultant regarding stormwater compliance for the site.
b. The site will comply with Resource Protection Event (RPv, 1-yr storm) requirements through
reduction of 15% or greater in impervious surface.
c. Conveyance (Cv, 10-yr storm) and Flooding (Fv, 100-year storm) event compliance will
likely be met through reduction of impervious surface on the site.
2. A Sediment and Stormwater Plan for the demolition phase of the project is currently under review.
The demolition plan includes the total area of applications S-22-06 and S-22-07. It is expected that
both of the City of Dover DAC applications will be submitted to DNREC as a single Sediment and
Stormwater Plan for the redevelopment phase.
3. A Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity has been
submitted that includes the total area of applications S-22-06 and S-22-07. This NOI Permit No.
6692 will continue through the construction phase for both applications until project closeout.
If you should have any questions, please do not hesitate to contact me at (302) 608-5460 or
Elaine.Webb@delaware.gov.
132
Page 133
Item 4.
OFFICES IN DELAWARE, MARYLAND,
WEB: HTTP://DUFFNET.COM
DUFFIELD ASSOCIATES Soil, Water & the Environment
LEGEND
5400 LIMESTONE ROAD
RIGHT-OF-WAY LINE
PROPERTY LINE
ADJACENT PROPERTY LINE
ZONING BOUNDARY LINE
WILMINGTON, DE 19808-1232
BENCHMARK
CONCRETE MONUMENT FOUND
CAPPED REBAR FOUND
PENNSYLVANIA AND NEW JERSEY
IRON PIPE FOUND
E-MAIL: DUFFIELD@DUFFNET.COM
BUILDINGS
TEL. 302.239.6634
x x FENCES
SIGNS
BOLLARDS
CURB
FAX 302.239.8485
CONCRETE
ON-SITE STRIPING
OFF-SITE SOLID STRIPING
OFF-SITE BROKEN STRIPING
OFF-SITE DASHED STRIPING
LG-Lot2-Sign-12598CE
P.E. #21140
KENNETH JAMES TAYLOR, JR., P.E.
FIRE HYDRANT
CHECKED BY:
PR. RIGHT-OF-WAY LINE
FILE NAME:
PR. PROPERTY LINE
PR. BENCHMARK
CONC.MON.SET. PR. CONCRETE MONUMENT
CAPPED REBAR SET PR. CAPPED REBAR KJT
4/1/2022
STATE: DELAWARE
I.P.SET PR. IRON PIPE
PR. BUILDING SETBACK LINE
DESIGNED BY:
PR. PAVING SETBACK LINE
PR. EASEMENT LINE
DRAWN BY:
PR. BUILDINGS
x x PR. FENCES
PR. SIGNS
KJT DPM
PR. BOLLARDS
PR. CURB
MARKING LEGEND PR. BRICK CHK'D BY
PR. CONCRETE DATE
SOLID WHITE OR YELLOW LINE 5" or 10" **
(SWL/5" **, SWL/10" ** OR SYL/5") PR. ON-SITE STRIPING
** SEE NOTE 5 5" PR. OFF-SITE SOLID STRIPING
DOUBLE SOLID YELLOW LINE 6" PR. OFF-SITE BROKEN STRIPING
5" PR. OFF-SITE DASHED STRIPING
(DSYL/5") LIGHT POLES
10'
30' BIKE RACK - 10 SPACES FIRE HYDRANT
BROKEN WHITE LINE (BWL/5") 5" (SEE DETAILS)
x PR. ON-SITE STANDARD
2' DUTY ASPHALT
x x x x x x
REVISION
DOTTED WHITE LINE 6'
(DWL/5" ** OR DWL10" **) 5" or 10" ** DWL/5"
** SEE NOTE 5
9'
18'
6' WIDE
CROSSWALK
NOTES:
1. ALL EXISTING PAVEMENT MARKINGS THAT ARE NO LONGER APPROPRIATE SHALL BE 16" WHITE
STOP BAR
ERADICATED BY PERMITTEE. ERADICATION SHALL BE ACCOMPLISHED BY WATER
SWL/5" 24'
BLASTING. PERMITTEE SHALL PLACE ALL REQUIRED NEW MARKINGS. No. - -
2. DIMENSIONED LANE WIDTHS ARE CURB-TO-CURB OR CENTERLINE OF STRIPING.
4'
3. ALL NEW LONGITUDINAL PAVEMENT MARKINGS SHALL BE EPOXY RESIN PAINT
MARKINGS, AND ALL NEW SHORT / TRANSVERSE AND SYMBOL MARKINGS SHALL BE HOT
STATE OF DELAWARE
R1-1 STOP
OWNER/
THERMOPLASTIC, AS DIRECTED BY DELDOT. SIGN
4. REFER TO SIGNAGE AND STRIPING DETAILS AND LEGEND THIS SHEET. 18'
DOVER, DE 19901
5. ** NORMAL WIDTH LONGITUDINAL MARKINGS SHALL BE 5 INCHES. WIDE WIDTH
MARKINGS (10 INCHES) SHALL BE PROVIDED IN ACCORDANCE WITH THE DELAWARE
MUTCD WHERE SPECIFIED ON THIS PLAN
24' 9'
DEVELOPER: 540 S DUPONT HIGHWAY
9' 18'
KENT COUNTY FAMILY COURT PARKING LOT
SWL/5"
DSYL/5"
18'
24'
16" WHITE
STOP BAR
CITY OF DOVER ~ KENT COUNTY ~ DELAWARE
18' 9'
SITE DEVELOPMENT PLAN SIGNAGE AND STRIPING PLAN 446 S GOVERNORS AVE
10' WIDE
CROSSWALK
DSYL/5"
SWL/5"
AREA OF 2" MILLING
DATE: APRIL 1, 2022
SCALE: 1" = 20'
20' 0 20' 40' PROJECT NO. 12598.CE
DRAWING SCALE 1" = 20' SHEET: C601
133
Page 134
Item 5.
Dover Air Force Base (DAFB) Compatible Use Study
PUBLIC WORKSHOP
Tuesday, May 17, 2022
5:30 – 7:30 p.m.
To join via Zoom: https://deldot-
gov.zoom.us/j/84704454648?pwd=OTJUaUZBUTc2ejNCS2RHQVpDTVdsQT09
Meeting ID: 847 0445 4648
To attend in-Person: DelDOT Administration Building- East 1st Floor
South Entrance- Delaware Room
800 Bay Road Dover, DE
Project Website: https://deldot.gov/projects/Studies/dafb/
The Delaware Department of Transportation (DelDOT) along with its consultants is holding a Public
Workshop to solicit public input on the Dover Air Force Base Compatible Use Study. The workshop
will introduce the public to the purpose, planning process, schedule and the initial data gathering
phase.
The public is invited to attend anytime between 5:30 and 7:30. The schedule is as follows:
5:45 to 6:15: A live presentation with Q & A will be presented both in person and via zoom.
6:15 to 7:30: The in-person public is invited to view the project information and direct comments
and questions to project staff. The virtual attendees will be provided links to the project information,
including videos and mapping. Questions and comments will be accepted live over zoom.
The recorded presentation will be available after the meeting on the project website listed above.
Comments will be received during the workshop, submitted online, or can be sent via email to
dotpublic@delaware.gov or Humaira.Nabeela@delaware.gov
134