Page 1
AGENDA
CITY OF DOVER PLANNING COMMISSION
Monday, August 15, 2011 – 7:00 P.M. - City Hall: Council Chambers
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF AGENDA
ADOPTION OF MINUTES OF REGULAR MEETING of July 18, 2011
COMMUNICATIONS & REPORTS
1) The Planning Commission Quarterly Workshop is scheduled for Tuesday, August 16, 2011 at
4:00pm in the City Hall Caucus Room.
2) Note: The Annual Review of C-08-01 House of Pride Conditional Use Permit directed to be
reviewed at the August 2011 Planning Commission Meeting will be rescheduled for the
September Planning Commission Meeting to allow completion of property inspections in order
to report compliance status.
3) Report on City Council actions
a. Updates from Meetings
b. Update on Ordinance #2011-14 with PC Amendment #1 - MI-11-06 Text
Amendment: Revisions to Article 10 of the Zoning Ordinance (Appendix B)
4) Update on other Planning activities
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval:
a. S-09-13 Leander Lakes Apartments at 2161 Forrest Avenue – Request for an extension of
the Planning Commission approval first granted on August 17, 2009 of the Site Plan to
permit a subdivision to create a parcel of 30 acres from the overall parcel of 42 acres and
the subsequent construction of ten (10) apartment buildings totaling 240 units with the
associated site improvements. The property is zoned RM-2 (Medium Density Residence
Zone). The subject area is located on the south side of Forrest Avenue, west of the land
currently under development as the new Dover High School. The owners of record are
the Jireh Christian Center, Inc. and Leander Lakes, LLC. Property Address: 2161 Forrest
Avenue. Tax Parcel: ED-05-075.00-01-05.00-000 and ED-05-075.00-01-5.01-000.
Council District 1. Previously, a one year extension was granted by the Planning
Commission on July 19, 2010 setting the plan expiration date as August 31, 2011.Under
the provisions proposed in Ordinance #2011-14 unexpired plans shall be eligible for an
extension of approval not to exceed 36 months from the initial approval date.
2) Review of Revisions to Architectural Review Certifications:
a. HI-09-01 Dover Public Library – Update and Review of the selected exterior finish
Page 2
City of Dover Planning Commission Agenda
Public Hearing: August 15, 2011
Page 2 of 4
materials for the Dover Public Library. Previously, the Architectural Review Certification
for the project was issued upon recommendation of the Historic District Commission on
June 17, 2009 and action by the Planning Commission March 15, 2010. Construction of a
two story library building of 46,000 S.F with the associated parking, walkways,
landscaping, and stormwater management facilities is underway. The project area
consists of 4.67 acres ± of land zoned I-O (Institutional and Office Zone) and subject to
the H (Historic District Zone). The property site is located on the north side of
Loockerman Plaza between South State Street and Legislative Avenue. The owner of
record is the City of Dover. The property address is 35 Loockerman Plaza. Tax Parcel:
ED-05-077.05-04-55.00-000. Council District #2. The Historic District Commission
reviewed this revision request on July 21, 2011 and has provided a recommendation.
b. HI-05-03 State Street Commons – Update and Review of Request for use of alternative
material for building entrance railings at porches and porticos. Previously, the
Architectural Review Certification for the project was issued upon recommendation of
the Historic District Commission on March 16, 2006 and action by the Planning
Commission on June 20, 2006 for the project known as State Street Commons.
Construction commenced on two connected 2 ½ story office buildings of 12,000 S.F.
each for a total of 24,000 S.F with a two level parking garage. The existing brick office
building at 502 South State Street consisting of 3,222 S.F. will remain. The property
consists 35,061 square feet ± of land zoned RG-O (General Residence and Office Zone)
and subject to the H (Historic District Zone). The property is located at the southwest
corner of South State Street and Water Street. The owner of record is YOZIMA, LLC;
request received from Onix-Z, LLC. Tax Parcel: ED-05-077.09-03-70.00-000. Council
District #2. The Historic District Commission reviewed this revision request on July 21,
2011 and has provided a recommendation.
3) Continuation of the Review of Draft “Policy on Physical Posting Requirements”
a. Review of Notice Templates
NEW DEVELOPMENT APPLICATIONS
1) Z-11-05 Lands of Harrington Commercial at 601 Fulton Street – Public Hearing and Review
for Recommendation to City Council on a rezoning application consisting of one parcel of land
totaling of 0.486 acres ±. The property is currently zoned M (Manufacturing Zone). The
proposed zoning is C-3 (Service Commercial Zone). The subject property is located on the
north side of Fulton Street between Ridgely Street and the railroad corridor. The owner of
record is Harrington Commercial, LLC. The equitable owner is Michael J. Harrington, Sr.
Property Address: 601 Fulton Street. Tax Parcel: ED05-076.08-01-14.00-000. Council
District 4.
2) US-11-02 McDonald’s USA, LLC: Comprehensive Signage Plan – Public Hearing and
Review of a Comprehensive Unified Sign Plan. The plan provides for multiple sign types
(pylon, wall, and directional signs) and number of signs for the McDonald’s at 1788 North
DuPont Highway. The parcel is zoned C-4 (Highway Commercial Zone). The site is located
on the west side of North DuPont Highway (Route 13) just south of the Scarborough Road
Page 3
City of Dover Planning Commission Agenda
Public Hearing: August 15, 2011
Page 3 of 4
intersection. The owner of record is McDonalds USA, LLC. Property Address: 1788 North
DuPont Highway. Tax Parcel: ED05-057.01-02-02.00-000. Council District 4.
3) S-11-11 Lands of Downtown Dover Partnership at 120 S. Governors Avenue – Public Hearing
and Review of a Site Development Master Plan and Architectural Review Certificate for the
construction of a four story 47,042 SF mixed-use building consisting of a retail component and
27 apartments, a four story 34,896 S.F. apartment building of 24 apartments with ground level
parking in the building, and other associated site improvements on the property at 120 South
Governors Avenue. The existing 16,783 SF commercial building on the property is proposed for
demolition. The application also includes a Minor Subdivision Plan to divide the property into
two lots. The property consists of 1.7653 acres ± and is zoned C-2 (Central Commercial Zone)
and subject to the H (Historic District zone). The property site spans the block between South
Governors Avenue and South New Street located north of, but not adjacent to, West
Loockerman Street. The owner of record is Downtown Dover Partnership (formerly the
Downtown Dover Development Corporation). Property Address: 120 South Governors
Avenue. Tax Parcel: ED05-077.09-01-44.00-000. Council District 4. The Historic District
Commission reviewed this application at their meeting on July 21, 2011 (HI-11-04). The
Project includes review of an Active Recreation Plan.
4) S-11-12 Dove View Apartments at 101-405 Doveview Drive – Public Hearing and Review of a
Site Plan for the construction of a four story 43,885 SF apartment building and other associated
site improvements including the completion of two partially constructed apartment buildings for
a total of 144 apartment units. The property is 6.73 acres ± and is zoned RG-5 (General
Residence Zone for Mid-Rise Apartments) and subject to the COZ-1 (Corridor Overlay Zone).
The property is located on the north side of Forrest Avenue (Route 8) just west of the Saulsbury
Road intersection. The owner of record is CRM Mid-Atlantic, LLC. Property Addresses: 101-
405 Doveview Drive. Tax Parcel: ED05-076.07-01-30.00-000. Council District 1. The Project
includes review of an Active Recreation Plan. A previous application for the property was
reviewed as C-06-02 DoveView Senior Apartments: Planned Neighborhood Design – Senior
Citizen Housing Option in August 2006.
5) S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements – Public Hearing
and Review of a Site Development Master Plan for the site planning and streetscape campus
enhancements associated with the abandonment of designated sections of North Bradford Street,
Fulton Street, Cecil Street, and several alleys in the Wesley College campus area. The
submission includes the Record Plan for vacated right-of-way and a Master Plan consisting of
five phases of site improvements including pedestrian amenities, paving, landscaping, and
parking lot reconfiguration/construction. This project is located in the area of the Wesley
College campus generally located north of Division Street between North Governors Avenue
and North State Street. The properties are zoned IO (Institutional and Office Zone) and RGO
(General Residence and Office Zone) with a property subject to the H (Historic District Zone).
The applicant is Wesley College. Property Addresses: Multiple. Tax Parcels: Multiple. Council
Districts 3 and 4. This project is associated with MI-10-06 Request for Street and Alley
Abandonment: Wesley College reviewed by the Planning Commission in April 2010 and as
approved by City Council August 9, 2010.
Page 4
City of Dover Planning Commission Agenda
Public Hearing: August 15, 2011
Page 4 of 4
6) C-11-05 Royal Farms at 293 South Saulsbury Road - Public Hearing and Review of a
Conditional Use Site Plan for the construction of a 5,786 S.F. retail store building, a 1,407 S.F.
car wash building, eight doubled-sided gasoline pumps under two canopy structures, and other
associated site improvements. The property consists of 3.64 acres ± and is zoned C-2A
(Limited Central Commercial Zone) and subject to the COZ-1 (Corridor Overlay Zone). In the
C-2A Zone, the establishment of gasoline pumps is an accessory use requiring conditional use
approval. The property is located on the northeast corner of Saulsbury Road and West North
Street. The owner of record is Roadway Express, Inc. The equitable owner is F&B Properties,
LLC. Property Addresses: 293 S. Saulsbury Road. Tax Parcel: ED05-076.11-01-43.00-000.
Council District 4. Waivers Requested: Partial Elimination of Upright Curbing.
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 5
CITY OF DOVER PLANNING COMMISSION
July 18, 2011
The Regular Meeting of the City of Dover Planning Commission was held on Monday July 18,
2011 at 7:00 PM with Chairman Hemmig presiding. Members present were Mr. Hemmig, Mr.
Tolbert, Colonel Welsh, Mr. Baldwin, Mr. Nichols, Mr. Holt, and Mr. Shomo. Mr. Friedman
and Mr. Ambruso were absent.
Staff members present were Mrs. Melson-Williams, Mrs. Townshend, Mr. Albert and Ms.
Metsch. Also present were Mr. Jordan Ashburn (in audience), Mr. Doug Liberman, Mr. Franklin
Penco and Mr. Douglas Ditty.
APPROVAL OF AGENDA
Mr. Tolbert moved to approve the agenda as submitted, seconded by Mr. Holt and the motion
was unanimously carried 7-0 with Mr. Friedman and Mr. Ambruso absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF JUNE 20,
2011
Mr. Nichols moved to approve the regular Planning Commission meeting minutes of June 20,
2011, seconded by Colonel Welsh and the motion was unanimously carried 7-0 with Mr.
Friedman and Mr. Ambruso absent.
COMMUNICATIONS & REPORTS
Mrs. Townshend stated that the next Quarterly Workshop is scheduled for Tuesday, August 16,
2011 at 4:00 PM in the City Hall Conference room.
Mrs. Townshend provided an update on the regular City Council and Legislative & Finance
Administration Committee meetings of June 27, 2011; the Safety Advisory and Transportation
Committee meeting of June 29, 2011; and the regular City Council, Utility Committee, the Parks
Recreation and Community Enhancement Committee meetings of July 11, 2011.
Mrs. Townshend provided an update on the library project. Construction is underway and
fundraising continues. There is a new Memorial Brick Program where you can have something
inscribed on a brick and then it will go in the brickwork that will go around the library.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Townshend presented the audience information on policies and procedures for the meeting.
OLD BUSINESS
C-10-02 The Arbors at 1051 College Road – Request for extension of the conditional approval
granted on August 16, 2010 by the Planning Commission to the Conditional Use Site Plan
Review to permit the construction of a 55,350 S.F. multi-family building with 48 total units
(condominium style units) and associated site improvements. The project is located on one
parcel of land totaling 4.32 acres ± and is zoned RG-2 (General Residence Zone). The subject
area is located on the north side of College Road, just west of McKee Road. The owner of
record is JNK, LLC. Tax Parcel: ED-05-067.00-01-35.03-000. Council District 1.
Page 6
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
Representatives: Mr. Jordan Ashburn, Ashburn Homes was present in the audience.
Mr. Hemmig questioned if there would be any items that would affect the extension with regards to
changes in the Zoning Ordinance? Responding to Mr. Hemmig, Mrs. Townshend stated that no
there was not.
There were no questions from any of the Planning Commission members at this time.
Mr. Nichols moved to approve a one year extension for C-10-02, The Arbors located at 1051
College Road, seconded by Mr. Holt and the motion was unanimously carried 7-0 with Mr.
Friedman and Mr. Ambruso absent.
NEW DEVELOPMENT APPLICATIONS
S-11-09 State Street Plaza at 1004 S. State Street – Public Hearing and Review of a Site Plan for
the construction of a 9,942 SF office building and other associated site improvements at 1004 South
State Street. The property is 0.7635 acres ± and is zoned C-2A (Limited Central Commercial
Zone). The property is located on the west side of South State Street at the intersection with
Wyoming Avenue. The owner of record is Gateway South Professional Center, LLC and the
equitable owner is ADP Properties, Inc. Property Address: 1004 South State Street. Tax Parcel:
ED05-077.17-07-21.00-000. Council District 2.
Representatives: Mr. Doug Liberman, Larson Engineering; Mr. Franklin Penco and Mr.
Douglas Ditty, Principal Owners.
Mr. Albert provided an overview of the application.
Mr. Liberman stated that this is a re-approval of the same Plan that went through before. Originally,
it was going to be a retail space and at this time, we would like to do a medical office. There are
two (2) of the three (3) principals of the new ownership group who are here this evening in the
audience if you have any questions for them. With regards to access, there is full access off of
Wyoming Avenue and a rights-in access off of South State Street. There are DelDOT
improvements that are to be done associated with the Plan which were mandated by DelDOT for
additional pedestrian heads which will make it safer for pedestrians in this area at this intersection.
Most of the approvals from before will stand. We will have to go back through DelDOT to see if
any standards have changed for those plans. The pedestrian signal layout and entrance design will
all stay the same. The Kent Conservation District will be a re-approval. The utilities may be a little
different for the office use as opposed to the retail use. We have redistributed some of the
landscaping along the front so that it has a more uniform look to the landscaping along South State
Street.
Mr. Liberman further stated that with regards to the building elevations that they presented, they
will probably not going to be what is going to go up there. The owners would like to do more of a
professional office space look to the building as opposed to a converted retail space. As it is listed
in the Plan review comments, any changes to the building will have to come back to the Planning
Commission for re-approval. This has been discussed with Staff and the owners and is something
2
Page 7
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
they look forward to doing to end up with a better looking building than what was originally
proposed.
Colonel Welsh stated that he does not like the architectural design as it looks pedestrian and
something that you would find at a strip mall. He would hope that you could someway find a way
to do a pitched roof. Something that will make it look a lot more residential like it belongs in a
residential neighborhood which it is. He is tired of flat roofs with small façades that come out to
make it look like something it is not. He hopes that they incorporate some type of pitched roof
design in their redesign.
Mr. Nichols stated that when Joe Melvin’s Sunoco station was on this site, they had an A-roof on
that building and it made it a nice looking building. The fake mini-mansard roofs that you show on
here now look ridiculous. He would go along with Colonel Welsh and feels that you should put an
A-roof on this building. Responding to Mr. Nichols, Mr. Liberman stated that given the depth of
the building, he is not sure how much peak they could put on it; however, we can review this with
the architect and see what they can come up with.
Mr. Holt stated that he agrees with the A-roof because when he owned his business his building had
a flat roof on it and he constantly had leaking problems. An A-roof will eliminate any future
leaking problems that you might have. Economically, it costs a little more; however, in the long run
it is going to be worth it.
Mr. Hemmig questioned with regards to the traffic pattern. He knows you are squeezing space;
however, he is concerned that if a car comes in off of Wyoming Avenue and all the spaces on the
north side of the building are occupied and you come around the east side of the building looking
for a space and you get down to the end and there is a car coming off of State Street, you will have
cars abutting one another and where will those cars go? They would have to turn around in the
entrance area when cars are coming in off of State Street. Did you look at the possibility of turning
the office the other way and putting most of the parking on this side of the building?
Responding to Mr. Hemmig, Mr. Liberman stated that no because they had to push so much of the
site entrance away from the intersection. It dictated the location of where the entrance off of
Wyoming Avenue was going to be and we pushed it as far to the west as we could. This held the
location of the building in this area. With regards to the situation you refer to, we are over in
parking spaces. We have thirty-six proposed with thirty-four provided. We could X-out a space to
provide for a turnaround area near the entrance. He understands your concern with two vehicles
coming head-to-head especially in that area.
Mr. Hemmig further questioned how many separate offices would there be and how many
employees? Responding to Mr. Hemmig, Mr. Liberman stated there would be three (3) offices.
Mr. Franklin Penco and Mr. Douglas Ditty came down from the audience to the podium at this time
to speak. Mr. Penco stated that what they are looking at is eight (8) to twelve (12) office staff. It
will all depend on if they open a second office which they are considering. If this is the case, it
would be more on the lower side of eight (8). If they are both in the office at the same time, it
would be more towards the twelve (12).
3
Page 8
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
Mr. Hemmig questioned what type of medical services would be provided? Responding to Mr.
Hemmig, Mr. Penco stated it would be an oral/malofacial surgery service.
Mr. Hemmig opened a public hearing and after seeing no one wishing to speak closed the public
hearing.
Colonel Welsh moved to approve S-11-09 State Street Plaza located at 1004 S. State Street with
recommended changes for the roof line to be further reviewed either by the Architectural Review
Sub-Committee or to the Planning Commission for final approval.
Colonel Welsh further stated that it would not make sense. How could we approve it if we need
them to come back for additional approval? Responding to Colonel Welsh, Mr. Hemmig
recommended at least thirty (30) days and the Architectural Review Sub-Committee.
Mrs. Townshend stated that the question becomes does it need to go to the Committee or are you
giving the applicant direction in terms of architecture that they could then bring back to you?
Responding to Mrs. Townshend, Colonel Welsh stated that they have been clear on the terms of
their direction. He does not believe that it needs to go to the Architectural Review Sub-Committee.
Colonel Welsh stated that he would amend the motion to ask that they return in August which would
give them thirty (30) days to consider changes.
Mr. Penco stated that he hears your concerns regarding the flat roof. He currently practices at 712
S. Governors Avenue that has a flat roof on it and the roof constantly leaks and has been leaking
like this since 1956 when the roof was first put on. Both he and Dr. Ditty are not happy with it
being a flat to slightly pitched roof. We have discussed with the architect in making this more of an
A-framed residential building. We are just looking to move forward with the construction process
while the architect is working on those plans.
Colonel Welsh stated that he does not know how they could approve it conditionally and have you
come back for approval in thirty (30) days and have you start construction now. He does not know
how that concept would work. Responding to Colonel Welsh, Mrs. Townshend stated that they
would not begin construction until this issue is resolved. The Site Plan approval from the Planning
Commission essentially gives some assurances that they are able to proceed with the site layout.
Colonel Welsh amended the motion for S-11-09 to conditionally approve the Site Plan pending
review of the amended architecture to be presented at the August Planning Commission meeting
and to reserve the last parking space on the south end as a turnaround space and approval of the
waiver request for partial elimination of curbing, seconded by Mr. Nichols and the motion was
unanimously carried 7-0 with Mr. Friedman and Mr. Ambruso absent.
MI-11-06 Text Amendment: Revisions to Article 10 of the Zoning Ordinance (Appendix B)
– Public Hearing and Review for Recommendation to City Council of a series of Amendments to
the Article 10 of the Zoning Ordinance related to the procedures and requirements for
applications to the Planning Commission and Historic District Commission. The proposed
changes are aimed at improving consistency within the ordinance, clarifying and streamlining
4
Page 9
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
review processes, removing antiquated language, and expanding public notification
requirements. Ordinance #2011-14.
Mrs. Townshend provided a Power Point presentation. (See Attachment #1)
Mrs. Townshend stated what you have before you is a complete overhaul of Article 10 of the
Zoning Ordinance. This is the procedure process for all Planning Applications except for the
Board of Adjustment. It would include Conditional Use Permits, Site Development Plans,
Historic District Commission and Architectural Review Certification in the Historic District and
amendments to the Zoning Ordinance both in map and text.
Mrs. Townshend further stated that the purpose of the proposed changes is multi-purposed. One
is to clarify the process and procedures for the various applications; two, to improve consistency
from one application type to another; three, to help streamline the process to make things easier
for the applicants and Staff to navigate; four, to improve the business friendliness of the process;
and five, to expand public notification requirement.
Mrs. Townshend stated that the first thing to look at is the expiration of plans. Currently, plans
expire after twelve (12) months from Planning Commission approval if construction has not
commenced. Applicants have the opportunity for one twelve month extension so there is a total
plan life of 24 months. What the proposal would do is extend the initial approval timeline for
twenty-four months so from when this body takes action with one twelve (12) month extension
taking the total plan life from twenty-four (24) months to thirty-six (36) months. Site
Development Master Plans would remain active for five (5) years provided that construction has
started within two (2) years of approval. The amendment would also clarify the expiration of
Architectural Review Certificates which is not specified in the current Ordinance and would
remove the expiration of Rezoning applications. With regards to the extension of previously
done Rezoning’s, the whole idea of reverting to the prior zone would go away. The thought
process there is when you do a Rezoning there is a finding of fact that indicates that regardless of
what use proposed is the zoning is appropriate for the site. In addition, in accordance with State
law, we do a Comprehensive Rezoning every five (5) years so if there is something that needs to
be changed; we have the opportunity every five years with the Comprehensive Plan and then the
Comprehensive Rezoning.
Mrs. Townshend further stated that with regards to the public notice requirements, this has
changed since they went through the process. Currently, a mailed notice is sent to all property
owners within 200 feet of the subject property at least ten (10) days prior to the Planning
Commission or Historic District Commission meeting. What we are proposing at this point is
that the mail notice be mailed to all property owners within 200 feet fifteen (15) days prior to the
meeting. The newspaper ad currently runs ten (10) days prior to the Planning Commission or
Historic District Commission meeting, and again we are looking at changing it to fifteen (15)
days. Currently, there is no physical posting required. What is being proposed is that physical
posting be placed in a conspicuous location on the subject property at least fifteen (15) days prior
to the Planning Commission meeting. In a subsequent agenda item this evening, we have what
we are proposing in terms of the policy for this physical posting to discuss.
5
Page 10
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
Mrs. Townshend further stated that the big change in terms of where we initially were and where
we are is the original version of this is the Ordinance had expanded the mailing distance to 300
feet. After review with the Business Community, Real Estate Community, and the Legislative
Finance and Administration Committee, this was kept at 200 feet where it is now.
Mrs. Townshend further stated with regards to Conditional Use and the changes you will see is it
sets different requirements for Conditional Use involving Site Plans versus not involving Site
Plans. One of the things that we continually struggle with in the Planning Office is if there is a
Conditional Use application where they are only changing the use and there is nothing in terms
of the site that is being proposed to change and there is nothing specified in the Ordinance as to
what they need to submit that is different. The idea is that you have a site where they are not
paving anything, not adding any paving, and they are not adding any buildings; it is just that the
use needs the review. The set of requirements for what they need to submit is specified in that
proposal differently from if they were building as an example, apartments. We tried to break out
what is required for Conditional Use versus Conditional Use Site Plan.
Mrs. Townshend further stated that we set forth a clear process for revocation of the Conditional
Use. When we had the issues come up with the House of Pride, there was no clear process for
revocation. Staff did what we felt is a good due process and have tried to build that into the
proposal that we have brought forward. It requires a description of the proposed use as well.
Sometimes with a Conditional Use it is a grey area and we need to know exactly what they are
proposing so that the Planning Commission and the public know at the time of approval exactly
what the Conditional Use is.
Mrs. Townshend further stated with regards to the Site Development Plan, currently there are
three types of review; this would add a fourth type of review. The Planning Commission Site
Plan is what you see every month and the Site Development Master Plan for larger projects. We
currently have Administrative Site Plans below the threshold of coming to the Planning
Commission; however, they go through the same administrative process. They just do not have
the public process side of it. What Staff has proposed to do is add a Zoning Review for things
where there is no physical alteration of the property. For instance, an office going into where a
retail used to be, we would conduct a Zoning Review to ensure that the zoning allows the use
and make sure that it doesn’t create any non-conformities; however, it would not require an
Administrative Site Plan which has created a problem when things try to change out in shopping
centers and they come in we tell them they need a Site Plan. This would improve our interaction
with the business community especially the small business owners that are simply trying to open
a business that is allowed at the location. The Zoning Review would essentially simplify things
for those folks.
Mrs. Townshend further stated that another change is the change of threshold for Planning
Commission review. Currently, if you are adjacent to a residential use and are greater than 500
square feet of disturbance, it comes to the Planning Commission. Staff is proposing to raise the
threshold to 1,500 square feet because there have been some very minor things that would come
to the Planning Commission due to disturbance that really are minor in nature. Every other
threshold would remain the same. With the Historic District Commission and the Architectural
Review Certification, it is currently vague or unclear as to which Architectural Review
Certificate can be issued by the Planner versus which need to go to the Historic District
6
Page 11
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
Commission for approval. We have broken it out by approval by the Planner, approval by the
Historic District Commission, and then the recommendation of the Historic District Commission
to the Planning Commission. In terms of what would be recommended by the Historic District
Commission to the Planning Commission, this does not change demolition and construction
which is the main things that this Commission sees. It also clarifies “Demolition by Neglect”
and the due process for the property owner and in the case that we are taking forward. This is
something that this Commission has not seen. We have had some buildings that we have had to
take to the Historic District Commission under the “Demolition by Neglect” provisions and there
is nothing in the Code that requires that we notify the property owner or hold any type of
hearing. We have added those provisions in what we have as the proposed Ordinance.
Mrs. Townshend stated with regards to the amendments to the Zoning Ordinance. Staff has tried
to break it out in terms of three (3) specific processes for the three (3) different types of
amendments you would expect. One would be the map amendment by application which is the
applicant who comes in for Rezoning. They want to rezone their property and this gives them a
process as well as a public notification process. The other would be an amendment to the Zoning
Text which essentially would be either brought forward by Staff or brought forward by three (3)
sponsors of City Council. Because we are adding the idea of physical posting and mailing, it is
very clear that the Text Amendments go in the paper. This will make it very clear as to what the
requirements are for a Text Amendment versus a map amendment. We also wanted to firm up
the process for the Comprehensive Map Amendment following the Comprehensive Plan or other
formal study. We added “other formal study” in there because there could be other things other
than a Comprehensive Plan. Staff is working on the Dover Air Force Base ALCUZ Study. Staff
will likely be bringing changes forward to the Airport Environs Overlay Zone based on that
study that came out by the Base. The idea is that this is a Comprehensive Rezoning and is
handled in a way that is different from applicants bringing forward a Rezoning application.
Mrs. Townshend further stated with regards to public outreach, Staff has worked very hard with
a lot of affected communities to make sure we are getting this right. In April, we presented a
presentation to the Historic District Commission of the areas in the Ordinance that relate to their
prevue. On May 3, 2011 Staff held a meeting where we invited engineers, lawyers, realtors,
developers, and home builders that was held at the Police Station where we received some
feedback at that meeting. On May 19, 2011 Staff met with ACEC Consulting Engineers who
also brought forward some suggestions. On May 25, 2011 Staff met with the Kent County
Association of Realtors and then on June 10, 2011 with a number of land use attorneys who had
a number of good ideas on how we could clarify some of the language. On June 13, 2011 it went
to the Legislative, Finance and Administration Committee and some final changes were
incorporated at that point.
Mrs. Townshend further stated that there is a table provided in your packet that summarizes the
comments that have been received and the changes that were made and reflected in terms of what
Staff has done with the various comments. Staff added back language that had been suggested
for removal regarding the Historic District Commission reporting annually. We changed the
mailed public notice distance from 300 feet to 200 feet which is essentially leaving it the way
that it is and not expanding it as previously suggested. Coming out of the meeting with the
attorneys, they brought forward a number of good suggestions on where we could clarify some
of the language. Also included in your packet was the feedback that has been provided to Staff.
7
Page 12
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
Mr. Tolbert questioned with regards to leaving the notification at 200 feet, the Planning Staff
recommended that it go to 300 feet; is this the case? Responding to Mr. Tolbert, Mrs.
Townshend stated that the initial proposal indicated 300 feet. Part of that was in response to
instructions from City Council to her to expand it. The feedback that we received from the
development community was to keep it at 200 feet. Staff does believe that 200 feet is adequate
from the beginning and that physical posting will hit more people than the expanded mailing
would. The reason it was changed to 300 feet was because we were specifically instructed to
increase the mailing distance. 300 feet was the largest distance that we could find anywhere in
the State of Delaware. 200 feet is standard and is what we saw most frequently.
Mr. Tolbert further stated that we have had instances where people have come in complaining
that they have not received notices within the 200 feet. Responding to Mr. Tolbert, Mrs.
Townshend stated that if they are within 200 feet and they did not receive the notice, we always
verify that it was mailed as we have the mailed receipts. There were some cases where they
stated they did not get the letter and we were able to find a signed green receipt so someone else
in the home may have signed for it. Part of the issue that we will always have is no matter where
you draw that line at 200 feet, 300 feet, or 1,000 feet, there is always going to be someone right
on the other side of that line who will say that they did not know about it. Staff believes that the
physical posting of the property that will be a bright color will be noticeable to people who are
driving or walking by that is going to pick up more people than expanding the public notice
mailing.
Mr. Hemmig stated that he agrees with the 300 feet.
Mr. Baldwin questioned what Staff hoped to accomplish by going from ten (10) days to fifteen
(15) days notification because to him it would give people additional time to lose things.
Responding to Mr. Baldwin, Mrs. Townshend stated that part of the issue with certified mail is
the post office will try delivery and if you are not there, they will not leave it. It will go back to
the post office. If it is mailed ten (10) days prior and say it takes three (3) days then you are
already up to seven (7) days before and you are not home, you are not going to get it you would
have to physically go to the post office and sign for it. There have been some cases where
people have stated that they did not find out about the meeting until four (4) days prior because
of the logistics of certified mail. The primary reason is because in the State Code, the
requirement for the newspaper ad is fifteen (15) days prior to the meeting not ten (10). Our
sense is that consistency is important.
Colonel Welsh stated that the more notice that you give people the better off you will be. You
have people that would like to come to the meeting for whatever reason or to be heard and they
are unable to change their plans because of such short notice.
Mr. Nichols stated that after having taken an hour to read through all of these sheets the only
thing he really found out was that Colonel Scrafford really was not sure if they were going to
have a Historic District Commission at all.
Colonel Welsh stated that he thinks that Staff has done an excellent job with this. It does make
sense to give, particularly in today’s economy, developers an opportunity to have an extended
period of time without having to go through the expense and inconvenience of having to reapply.
8
Page 13
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
Mr. Hemmig questioned the clarification on the Conditional Use with regards to Site Plans. An
example of where these may have affected us in our decisions was on Forrest Street just past the
Capital School District offices where there was a house that we considered Conditional Use for a
daycare. We turned it down I believe because it had a single driveway in and out to the back rear
parking. He does not know that they would have known about that Conditional Use application
had we not had something in front of us to show us. Responding to Mr. Hemmig, Mrs.
Townshend stated that they would still have to show the Plan. The difference is in terms of if it
is a Conditional Use Site Plan where they would have to do the tree planting, sidewalk and site
improvements. If it is just the use, you would look at the site; however, not necessarily be
making improvements to the site unless that were a conditional of the approval.
Mr. Hemmig further stated that we had a similar situation out on Webbs Lane with the Delaware
State News where there were two buildings and one was being used as something else and there
were issues with sidewalks. Would we have known that under this new idea? Responding to
Mr. Hemmig, Mrs. Townshend stated that you would still get all of that information. The main
thing is it gives you the ability to accept certain existing conditions rather than look at it as if it is
new development. One of the challenges is with some of the Conditional Uses where it is truly
just the occupant of the building if it makes sense with that occupancy to require additional
parking or require a sidewalk that would be okay; however, it would give you the ability to
accept certain existing conditions because you are only looking at the use.
Mr. Hemmig further questioned if they would be restricted from looking at the other things that
we would be able to look at if it was a Site Plan? Responding to Mr. Hemmig, Mrs. Townshend
stated that no because essentially it is primarily what they are turning in. If you start on Page 5
of 33 on the all-black ink version of the Ordinance starting with line 176 this starts the process.
If you look at the legal data and all of the things that are required, it takes you all the way down
to line 247. You are still getting everything; it is just what they would need to add to the site.
Mr. Hemmig further stated with regards to the 200 feet versus 300 feet, as Mr. Tolbert pointed
out, we have occasionally had someone within the 200 feet who said that they did not get
notified. However, more times than not, we have had people who are just outside the 200 feet
that are still close enough to be strongly be affected by whatever development there is. He was
very much in favor of the 300 feet and it appears that the City Council also was initially. Did the
business community give you enough grief and you backed off of it? Responding to Mr.
Hemmig, Mrs. Townshend stated that there was a significant change in City Council from the
time that direction was given to Staff.
Mr. Hemmig further stated that what concerns him the most is if you have a development that is
near a residential area and you have large residential lots 200 feet might include one, maybe two
away; however, the third house may be just as affected. It becomes more important when you
have more close up residential squeezed in where the lots are 50 feet and you go out 200 feet you
might get three or four; however, the fifth person is still close enough to be affected. He feels
that 200 feet does not make sense.
Colonel Welsh stated that it makes sense that the developers would oppose expanding that radius
because people are not going to come here on their own to speak for the proposal. If you expand
that radius by 300 feet, you are bringing more people in who would be opposed to the
9
Page 14
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
development. Whose expenses are the mailings? Responding to Colonel Welsh, Mrs.
Townshend stated that it would be the applicants and it is probably the bulk of the issue. It
depends on the size of the subject property and the size of the parcels surrounding it.
Mr. Albert stated that if the mailing list is located Downtown, most mailing lists are between 30
and 50 properties if it is a large development. One thing you have to remember in looking at this
is that when you expand the radius on the circle, the area that you are getting is not going up
proportionately; it is going up exponentially. In his opinion, in preparing these lists every single
month for all of the applications, 300 feet becomes burdensome. He is not advocating for either
side; however, he sees every list. There are maybe a couple of times when large residential
properties are adjacent to things and maybe the entire neighborhood should be notified; however,
hopefully the physical posting will address that concern because anyone who goes near there will
see the sign. The other component would be the newspaper notification that will be the catchall
for the rest.
Colonel Welsh stated that we have come a long ways in easing the burden on the developer, the
people who are investing the money in the community. Maybe we should try this notice for a
while and see how that works. If we find we are still getting complaints, then maybe next year
we consider extending it to 300 feet.
Mr. Tolbert stated that when people are not notified formally, do they assume that they can’t
come in and make comments on the project? Have you found that to be the case? Responding to
Mr. Tolbert, Mrs. Townshend stated that they have not found this to be the case. If anyone calls
our office and asks any questions, we encourage them to look at the file and we will sit down
with people and go through the Site Plan with them. We always encourage people if they have
any concerns at all to either be here at the meeting or put their concerns in writing. We don’t
want things to go through and have people unhappy because they felt they did not have the
opportunity.
Mr. Hemmig questioned if there is anything on the website that encourages people to attend
these meetings? Responding to Mr. Hemmig, Mrs. Townshend stated that we could certainly put
something on the website.
Mr. Hemmig further questioned if we notify any Homeowners Associations that a development
is coming in so that we can get it to all of the people in the community? Responding to Mr.
Hemmig, Mrs. Townshend stated that we do not. The problem in doing that would be that we
cannot do it consistently because we do not necessarily have contact information for each of the
associations. If we cannot do it consistently, it puts us in a legal bind.
Mr. Hemmig opened a public hearing and after seeing no one wishing to speak closed the public
hearing.
Mrs. Townshend stated that if there are any amendments that the Planning Commission would
like to see, that you put those in the form of a motion first and vote on them and then vote on the
overall. Mr. Hemmig brought up to her that in lines 295 to 297 there is some awkwardly worded
stuff that we might need to change. Staff will be bringing forward an amendment to change that
10
Page 15
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
to read “Site Development Plans shall be subject to review and approval by the Planning
Commission if they meet the following thresholds:”
Colonel Welsh moved to amend Lines 295 to 297 to read as stated by Mrs. Townshend, seconded
by Mr. Nichols and the motion was unanimously carried 7-0 with Mr. Friedman and Mr.
Ambruso absent.
Colonel Welsh moved to forward to City Council approval of MI-11-06 Text Amendment:
Revisions to Article 10 of the Zoning Ordinance (Appendix B) with the recommended
amendment, seconded by Mr. Tolbert and the motion was unanimously carried 7-0 with Mr.
Friedman and Mr. Ambruso absent.
NEW BUSINESS
Review of Draft “Policy on Physical Posting Requirements”
Mrs. Townshend provided a sign poster that is a bright yellow color so that it can be seen and is
obvious when it is on a site. Staff has proposed that the sign be a minimum of 22x28 inches and
no greater than 36x36 inches in size. The sign poster that was displayed is the minimum of
22x28 inches.
Colonel Welsh stated that he did not feel that at that size, it would be something you could catch
on a drive-by. Responding to Colonel Welsh, Mr. Albert stated that in New Castle County you
cannot read these signs from the road and they are bigger and have plans on them. It is seeing
the color that draws attention.
Mrs. Townshend further stated that the idea is that over a period of time when people get
accustom to seeing this they will associate it with an application.
Mr. Nichols stated that when you normally see one of these placards in front of a property, you
know something is going on with that property.
Mrs. Townshend further stated that Staff made a conscience decision not to put the Site Plan
drawing on the placard. Her personal concern was that if you put too much on it, you will have
people pulling off on the side of the road in an unsafe condition to look at the details of the Site
Plan. What Staff wants is if people are interested, we want them to contact Staff so that we can
review the Site Plan with them when they are reviewing it not on the side of the road with cars
flying by at 55 MPH.
Mr. Tolbert questioned if it would be appropriate to place a replica of the City’s seal on it; then
people would know it is official from the City? Responding to Mr. Tolbert, Mrs. Townsend
stated that they could do that.
Mr. Albert stated that there is a great deal of text on this placard and the way that the program is
setup to do that text; this is the minimum. If we place the seal on it, everything is going to get
compressed by an order of magnitude. We could put the City seal on; however, it would not be
noticeable as a City seal.
11
Page 16
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
Mr. Hemmig stated on the placard at the top it states “Planning Commission Action” will this be
just for Site Plans or for Rezonings also? Responding to Mr. Hemmig, Mrs. Townshend stated it
would be for Site Plans and Rezonings. There will be two (2) different notices one for Site Plans
and one for Rezonings that would both handle Planning Commission and City Council dates.
The Planning Commission action addresses Site Plans and Conditional Uses.
Mr. Hemmig stated that he would like to see it made less wordy so that you can make the text as
large as possible. It should state “Notice – Site Plan Proposed” or “Notice – Rezoning
Proposed.” He does not feel that they need all the text which states “The Dover Planning
Commission will consider a Site Development Plan for,.” He feels you should just post the
notice of what it is and if it is a Site Plan or Rezoning with the address, date, and time it will be
heard and possibly a contact phone number. He would severely cut down on the amount of
verbiage so that you can make everything as large as possible.
Colonel Welsh stated that they still need to have some idea of what is going to transpire.
Responding to Colonel Welsh, Mrs. Townshend stated that it already states “Planning
Commission Action, Site Development Plan, address, name of project, and instead of public
comment we could state “Public Hearing.” We could take out public comment and just state
“Public Hearing, date, time, and a phone number” if people want to call with questions.
Colonel Welsh stated that you could cut down on the lower portion of the placard wording. He
still feels that you need to leave the fact that there is an action taking place through the Planning
Commission and what the proposal is in terms of site development, redevelopment or Rezoning
for consideration.
Mr. Hemmig stated that there were some redundancies on the placard. It says “Planning
Commission Action” and then it says “The Dover Planning Commission.” You could remove
the upper Planning Commission wording and state something like “Site Plan for Retail” or
“Rezoning.”
Colonel Welsh stated that it has to be something that would catch someone’s attention in big
bold letters and then “The Dover Planning Commission will hold a public hearing on this date.”
Mrs. Townshend stated that the Ordinance is expected to go to City Council on August 8, 2011
and the Planning Commission meets on August 15, 2011. It would go in effect for applications
for September 19, 2011. We could bring back a revised template at your August 15, 2011
meeting.
Mrs. Townshend further stated in terms of the Policy, the dimensions, are a minimum of 22x28
inches and a maximum of 36x36 inches and no taller than four (4) feet and no shorter than three
(3) feet. The idea is that this is going to be the visual window for people who are driving. It will
need to be affixed to the ground by a minimum of two (2) posts and printed on bright yellow.
Handwritten postings are not permissible and need to be within the front yard setback with a
maximum setback of ten (10) feet from the front property line. If it is Downtown where you just
can’t get it in the ground, then it would need to be affixed to a wall or window. On corner
properties, it would be on the frontage of where the property is addressed. Where more than one
parcel is involved, only one posting would be required unless parcels are separated by a street or
12
Page 17
CITY OF DOVER PLANNING COMMISSION JULY 18, 2011
one single parcel divided by a road or if they are not adjacent to each other. If it is something
that is part of a Master Plan, no more than three (3) postings would be required. Maintenance and
removal would require the applicant to submit to Staff a date stamped photograph showing the
location. This has been discussed at the Staff level and our Staff will also go out at the beginning
of the fifteen (15) days and make sure that these are out as well. If the placard gets destroyed by
natural causes or vandalism, the applicant would be required to replace it up to two (2) times.
The placard needs to be removed seven (7) days after the public hearing and if not removed, they
would be treated as abandoned signs. If the application is deferred, the placard will still need to
be removed seven (7) days after the public hearing.
Colonel Welsh moved for approval to accept the policy; however, defer action on the templates
until the August meeting at which time Staff will bring back less wordy templates, seconded by
Mr. Tolbert and the motion was unanimously carried 7-0 with Mr. Friedman and Mr. Ambruso
absent.
Nomination and Election of Officers (Chairman and Vice-Chairman)
Mr. Nichols moved to nominate Mr. Michael Hemmig as Chairman of the Planning Commission,
seconded by Colonel Welsh. A secret ballot vote was completed at this time by the seven
members present. The votes were tabulated and Mr. Hemmig announced as the Chairman of the
Planning Commission.
Mr. Shomo nominated Colonel Welsh as Vice-Chairman of the Planning Commission, seconded
by Mr. Nichols. A secret ballot vote was completed at this time by the seven members present.
The votes were tabulated and Colonel Welsh announced as the Vice-Chairman of the Planning
Commission.
Appointment of the Architectural Review Oversight Subcommittee of Planning
Commission (in accordance with Zoning Ordinance, Article 10 §2.28)
Mrs. Townshend stated that the current members are Mr. Michael Hemmig, Colonel Robert
Welsh, Mr. Terry Jackson, Mr. Jerry Peters, and Mr. Dave Bonar as the Mayor’s designee.
Mr. Hemmig questioned if there was anyone who would like to volunteer to be on the
Committee? Colonel Welsh stated that he would like to volunteer to continue on the Committee.
Mr. Hemmig seeing no one else wishing to volunteer stated that he would remain on the
Committee.
Mr. Hemmig stated that he would appoint Colonel Welsh and himself as members of the
Architectural Review Oversight Committee.
Meeting Adjourned at 8:24 PM
Sincerely,
Diane Metsch
Secretary
13
Page 18
MEMORANDUM
Planning & Community Development
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
Date: August 5, 2011
To: Planning Commission
From: Ann Marie Townshend, AICP
RE: Annual Review of House of Pride Conditional Use Permit (C-08-01)
On January 18, 2011, the Planning Commission acted to provisionally continue the Conditional Use Permit for a
philanthropic use and social service agency on seven properties owned by the House of Pride. The associated
properties and conditions placed by the Commission are detailed in the attached Notice of Reconsideration issued
on January 20, 2011 following Planning Commission action. One of these conditions is that the Planning
Commission review the Conditional Use Permit annually. At the Planning Commission meeting on February 22,
2011, Staff recommended that the annual review by the Commission take place in August of each year, to avoid
considering the issue during winter months, when potential non-compliance with the conditions of the Conditional
Use Permit could result in displacement of residents during extreme weather conditions.
During July, the Fire Marshal’s Office and Code Enforcement Division made attempts to contact House of Pride to
schedule inspections so that the results of these inspections could be reported to the Planning Commission in
August. To date, the Fire Marshal’s Office and Code Enforcement Division have received a lack of response to
phone calls and visits to the property to schedule these inspections. On August 5, 2011, the Fire Marshal’s Office
issued a notice of violation for failure to schedule the necessary inspections.
Due to the challenges staff has had in scheduling inspections, staff has deferred the annual review of the
Conditional Use Permit to the Planning Commission meeting on September 19, 2011, to allow for time to
complete the inspections or to provide notice of potential revocation if inspections are not scheduled.
Page 19
City of Dover
February 25, 2011
Marian Harris
House of Pride, Inc.
105 South New Street
Dover, DE 19904
Re: Re: Notice of Re-inspection results of Conditional Use
C-08-01: House of Pride properties located on North and South New Street, Dover,
Delaware
16 North New Street ED-05-076.08-05-22.00-000
20 North New Street ED-05-076.08-05-20.00-000
29 South New Street ED-05-077.05-03-10.00-000
37 South New Street ED-05-077.05-03-08.00-000
38 South New Street ED-05-076.08-05-84.00-000
55-57 South New Street ED-05-077.05-03-02.00-000
102 South New Street ED-05-077.09-01-35.00-000
105 South New Street ED-05-077.09-01-37.00-000
110 South New Street ED-05-077.09-01-31.00-000
Dear Ms. Harris:
At its meeting of January 18, 2011, the City of Dover Planning Commission moved to provisionally
continue the Conditional Use Permit for a philanthropic use and a social service agency for the
above-stated properties owned by the House of Pride, subject to the following requirements:
Property at 35 North New Street is not included in this action.
The Conditional Use Permit has been revoked for 16 North New Street and 102 South
New Street, effective immediately (which means that neither property shall be used for the
recovery program or transitional housing). Both houses are currently unoccupied.
On the 30th day (February 18, 2011), if full compliance is not made, the Conditional Use
Permit shall be administratively revoked by staff. (Copies of the inspection reports issued
by the Fire Marshal’s Office and Code Enforcement Division are attached.)
The Conditional Use Permit shall be subject to annual review by the Planning
Commission.
Each property shall be considered independent of the others. (By February 18, 2011, if
any property has not achieved full compliance, the Conditional Use Permit shall be revoked
for those properties; however for any property that has achieved full compliance, the
Conditional Use Permit shall remain in place.)
The re-inspections for 20 North New Street , 29 South New Street, 37 South New Street, 105 South
New Street, 110 South New Street, occurred on February 18, 2011 and it was determined that those
properties has corrected the code violations and would remain open and part of the Conditional Use
Permit.
The re-inspection for on 55-57 South New Street and 38 South New Street were completed on
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 20
Notice of Re-inspections of Conditional Use C-08-01 House of Pride
at North and South New Street
February 25, 2011
Page 2 of 2
February 21, 2011. It was determined that 55-57 South New Street would remain open and part of the
Conditional Use Permit.
During the re-inspection at 38 South New Street it was determined that there were numerous code
violations that had not been corrected. It is also noted that the Rental Permits have not been renewed
for both properties. Violation notices were mailed on February 24, 2011 addressing the violations
that still need to be corrected. The re-inspection date stated on the February 24, 2011 letters of April
18, 2011 is valid for only the exterior painting violations. All other violations shall be corrected no
later than Thursday, March 3, 2011. A follow up inspection will be scheduled for Friday March 4,
2011.
The Conditional Use Permit for the property located at 38 South New Street shall be revoked
and the building is shut down for use if code corrections are not completed by Thursday,
March 3, 2011.
Should you have any questions, or require further assistance, please contact me at (302) 736-7196.
Sincerely,
Ann Marie Townshend, AICP
Planning and Community Development Director
cc: Sandra Dean
Tim Taraila, Code Enforcement Supervisor
Janelle Cornwell, AICP Planner II
C-08-01
Page 23
City of Dover
ARCHITECTURAL REVIEW REPORT
Update and Review of Exterior Finish Materials
Recommendation Report of the Dover Historic District Commission
Meeting of July 21, 2011
For Consideration by Dover Planning Commission
Meeting of August 15, 2011
Application: Dover Public Library, HI-09-01 and S-10-06
Location: 35 Loockerman Plaza
Current Request for Review:
As part of the ongoing project for the construction of the new Dover Public Library, some design
revisions to the exterior finish materials are proposed as a result of design work, construction
bidding, and value engineering initiatives. The Historic District Commission was alerted to the
potential for changes in material by the City Manager at their February 17, 2011 meeting who
noted that a submission would be forthcoming once a revised proposal was determined. The
project is now actively under construction (at the foundation phase). In the approval for
Architectural Review Certification for the Library project, it was noted that any changes to
identified exterior materials could require additional review by the Commission.
A letter with attached documentation (dated 7/6/2011) showing revisions to several exterior
finish materials is presented for Review of the Architectural Review Certification by the
Planning Commission. See attached documents. The changes to exterior finish materials focus on
three areas specifically:
Brick at library “bookends”: The ends of the building were originally proposed as an
ashlar stone pattern. The new material is a dark brown utility size brick.
Metal standing seam roof: The surface material for the main roof was originally shown as
a slate roof in a variety of gray tones. The new material is a metal standing seam roof in a
gray color.
Light Monitors with slate shingles: The surface material was originally shown as a slate
shingles but consideration was being given to using other materials such as a metal panel
system. The new material selected is slate shingles.
RECOMMENDATION OF THE HISTORIC DISTRICT COMMISSION:
The Historic District Commission reviewed the revised submission pertaining to the selected
exterior finish materials for the end walls, roof, and light monitors at their July 21, 2011 meeting.
The following members were present: Chairman Dick Scrafford, Mr. Terry Jackson, Mr. Chaz
Salkin, Mr. Joe McDaniel, and Mr. George Fisher. The revised submission was represented by
Mr. Zach Carter, representing the City of Dover, Director of parks, Recreation and Library for the
City of Dover and Mr. Chris McCone of EDiS Company, Project Manager.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 24
HI-09-01 Dover “Anchor” Public Library: Update & Review of Exterior Finish Materials
Architectural Review Recommendation from Historic District Commission
From July 21, 2011 Meeting
Page 2 of 4
Action Taken by Historic District Commission: The motion to recommend approval passed 5-0
of the members present. The Historic District Commission recommends approval of the
suggested changers to the exterior finish materials as presented. These materials consist of
a utility size brick for the library ‘bookends’; a metal standing seam roof in a gray color
for the main roof of the building; and slate shingles for the light monitors.
This Recommendation is forwarded to the Planning Commission for the final action on the
revised Architectural Review Certification.
The following information was considered by the Historic District Commission in marking their
recommendation including the initial recommendations made by Planning Staff in regards to the
revised submission. See also attachments of the previous Recommendation Report for the project
and meeting minutes. Discussion at the Historic District Commission meeting also included the
appearance of the materials proposed for the light monitors, the installation of slate on vertical
surfaces, and labor & material costs. Also presented were actual samples of the brick to be used
on the building.
Project History:
On June 17, 2009, the Historic District Commission conducted a public hearing and took action
to make a recommendation on the Architectural Review Certificate for the Dover “Anchor”
Public Library project. This application consisted of the construction of a two story library
building of 46,000 S.F with the associated parking, walkways, landscaping, and stormwater
management facilities. The project area consists of several parcels of land totaling 4.67 acres ± of
land zoned I-O (Institutional and Office Zone) and subject to the H (Historic District Zone). The
property site is located on the north side of East Loockerman Street between South State Street
and Legislative Avenue/Innovation Way in an area also known as The Plaza. The owner of
record is the City of Dover.
As presented in June 2009 (proposal 4/15/2009), the proposed library building was described as
follows in the Architectural Review Report:
The brick building consists of two main forms: a rectilinear “bar-like” form with a side
gable roof and an oval form of predominately glass with a flat roof/green roof system.
The ends of the building are „bookended‟ by a wide bay clad in ashlar stone with a large
chimneylike form extending through the roof line.
The predominant exterior finish materials for the library building are brick and ashlar
stone veneer with the wall detailing provided through the use of brick patterning and
sawn stone elements. Brick detailing and changes in the stone veneer mark the
watertable on the building with a similar pattern noting the transition to the second floor.
A heavy cornice line indicates the transition to the gable roof which is clad in slate
shingles. The window openings use clear glass with aluminum framed curtain wall
systems construction for the large openings and aluminum double hung windows and
single windows for the smaller openings. At the roof level, four sets of paired light
monitors bring northern light into the building. These light monitors are also to be clad
with slate shingles.
2
Page 25
HI-09-01 Dover “Anchor” Public Library: Update & Review of Exterior Finish Materials
Architectural Review Recommendation from Historic District Commission
From July 21, 2011 Meeting
Page 3 of 4
Staff notes that at the time of the original review the cladding and detailing of the roof light
monitors was still in design with several material options under consideration.
Architectural Review Certification Review and Action:
Following a presentation on the project, the discussion at the Historic District Commission
meeting of June 2009 also included questions pertaining to exterior finish materials of the roof,
light monitors, use of ashlar stone, color choices, and the „bookend‟ forms. The Historic District
Commission recommended approval of the Architectural Review Certificate for the Dover
“Anchor” Public Library project finding the overall building to be of a contemporary design yet
compatible with the buildings of the Capitol Square context of the Historic District. The
Commission accepted the design presented with the conservations/comments from the meeting
on exterior finish materials. The Commission noted the compliance of the project with regards to
the Design Standards & Guidelines and recognized the Staff comments and recommendations
(Items #1-12) as conditions. (See the attached copies of the Architectural Review Certification
Recommendation Report and Meeting Minutes.)
On March 15, 2010, after a public hearing and review the Planning Commission granted
approval of the Architectural Review Certificate for the Dover Public Library project following
the recommendation of the Historic District Commission. (See attached excerpt of the Meeting
Minutes.) The Final Site Development Plan approval was granted on March 18, 2011 and the
Building Permit #10-1904 was then issued for construction.
Review of DESIGN STANDARDS AND GUIDELINES
Location within the Dover Historic District Zone requires proposals for demolition, new
construction, additions, and certain renovation or rehabilitation activities to existing buildings to
receive an Architectural Review Certificate. As stated in the Design Standards and Guidelines
for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted
“if it is found that the architectural style, general design, height, bulk and setbacks, arrangement
location and materials affecting the exterior appearance are generally in harmony with
neighboring structures and complementary to the traditional architectural standards of the historic
district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a
recommendation to the Planning Commission regarding the project‟s compliance with the
architectural review standards.
This revised proposal must be reviewed for conformity with the design criteria guidelines found
in Chapter 4: New Construction, Additions, Demolition and Relocation. For the new library
building, the applicable review considerations are the design criteria and development guidelines
associated with “New Construction”(Chapter 4: pages 4-1 through 4-8). Materials is one of the
guidelines for new construction to be considered in the review by the Historic District
Commission (and Planning Commission) of the project for Architectural Review Certification.
Other guidelines focus of style, scale, elevation of the first floor, floor-to-floor heights, bays,
windows and doors, absolute size, massing; orientation, proportions, forms, siting and high
density/large scale construction.
3
Page 26
HI-09-01 Dover “Anchor” Public Library: Update & Review of Exterior Finish Materials
Architectural Review Recommendation from Historic District Commission
From July 21, 2011 Meeting
Page 4 of 4
STAFF COMMENTS AND RECOMMENDATIONS
The following are Staff comments and recommendations for this submission regarding the
revised exterior finish materials for the project and Architectural Review Certification.
1. Staff recommends conditional approval of the revised Architectural Review Certificate
pertaining to the selection of revised exterior finish materials for the „bookend‟ walls,
roof, and light monitors of library building project finding the materials selected to be
compatible with character of the historic district and appropriate materials as
recommended in the Design Standards and Guidelines.
2. Any revisions or changes in the identified materials may be subject to further review by
the Historic District Commission.
3. For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector and Office of the Fire Marshal
for these requirements and any necessary addendums to the Building Permit as issued
which may be necessary with this change in materials.
4. In the event, that major changes and revisions to the building design and materials or site
plan occur in the finalization of the site plan contact the Department of Planning and
Inspections. These changes may require resubmittal for review by the Historic District
Commission.
Attachments:
Letter of Request dated 7/6/2011
Graphics of Revised Building and Materials
Architectural Review Recommendation Report of HDC meeting of June 17, 2009
Meeting Minutes excerpt of HDC meeting June 17, 2009
Meeting Minutes excerpt of Planning Commission meeting of March 15, 2010
4
Page 31
City of Dover
ARCHITECTURAL REVIEW REPORT
Recommendation Report of the Dover Historic District Commission
Meeting of June 17, 2009
Application: Dover “Anchor” Public Library
Location: North side of East Loockerman Street on The Plaza
Tax Parcels: ED-05-077.05-04-51.01-000
ED-05-077.05-04-53.00-000
ED-05-077.05-04-54.00-000
ED-05-077.05-04-55.00-000
ED-05-077.05-04-56.00-000
Owner: City of Dover
Present Zoning: I-O - Institutional and Office Zone
H- Historic District Zone
SWPOZ – Source Water Protection Overlay Zone* (*Exempt from
Tier 3 provisions due to Downtown Redevelopment Target Area
location. Zoning Ordinance, Article 3 §29.79)
Present Use: City Hall and municipal parking lot
Proposed Use: Public Library, City Hall, and municipal parking lot
File Number: HI-09-01
Project Description:
The Historic District Commission conducted a public hearing and took action to make a
recommendation to the City of Dover Planning Commission for an Architectural Review
Certificate for the Dover “Anchor” Public Library project. This application consists of the
construction of a two story library building of 46,000 S.F with the associated parking, walkways,
landscaping, and stormwater management facilities. The project area consists of several parcels
of land totaling 4.67 acres ± of land zoned I-O (Institutional and Office Zone) and subject to the
H (Historic District Zone). The property site is located on the north side of East Loockerman
Street between South State Street and Legislative Avenue/Innovation Way in an area also known
as The Plaza. The owner of record is the City of Dover. The property address is 15 East
Loockerman Street. Tax Parcels: ED-05-077.05-04-51.01-000, ED-05-077.05-04-53.00-000,
ED-05-077.05-04-54.00-000, ED-05-077.05-04-55.00-000, and ED-05-077.05-04-56.00-000.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 32
HI-09-01 Dover “Anchor” Public Library
Architectural Review Recommendation Report from Historic District Commission
June 17, 2009 Meeting
Page 2 of 8
RECOMMENDATION OF THE HISTORIC DISTRICT COMMISSION:
This application was considered at the June 17, 2009 meeting of the Historic District
Commission. The following members were present: Chairman Dick Scrafford, Mr. Terry
Jackson, Mr. Chaz Salkin, and Mr. Joe McDaniel. The application was represented by Mr. Zach
Carter, Representing the City of Dover, Director of Parks, Recreation and Library for the City of
Dover; Douglas Moss, Holzman Moss Architecture; Mr. Eddie Kung, Holzman Moss
Architecture and Project Manager; Mrs. Arden Bardol, Principal with Becker Morgan Group,
Inc.; and Mrs. Margery Cyr, Library Director. Public testimony was received from Mrs. Dorothy
Snyder of the Dover Public Library Advisory Commission.
Action Taken by Historic District Commission: The motion to recommend approval passed 4-0
of those members present. The Historic District Commission recommends approval of the
Architectural Review Certificate for the Dover “Anchor” Public Library and to accept the
design presented with the conservations/comments (of today’s meeting) on exterior finish
materials. The Commission notes the compliance of the project with regards to the Design
Standards & Guidelines and recognizes the Staff comments and recommendations.
The following are Staff comments and recommendations for this application regarding
project activities and Architectural Review Certification.
1. Staff recommends conditional approval of the Architectural Review Certificate for
the construction of the library building project finding the overall building to be of
a contemporary design yet compatible with the buildings of the Capitol Square
context of the Historic District.
2. These conditions are recommended by Staff to improve the project’s compliance
with the recommended guidelines of the Design Standards and Guidelines. The
following are recommended conditions:
a. Any revisions or changes in the identified materials may be subject to further
review by the Historic District Commission.
b. The selected brick choices should be compatible to the brick of other existing
buildings in the area.
c. Consider options for the cladding and detailing of the roof light monitors.
d. Signage identifying the library should be integrated into the building and site
design. Consideration of any free standing signage may require additional
review.
e. Light fixtures/poles should continue style of the lighting used in the Capitol
Square area or Downtown Loockerman Street areas. A taller two-light style
fixture may be more appropriate within the parking lot areas.
f. Identify the landscaping for the improved parking lot reconfiguration and its
entrance from King’s Highway.
3. The following items should be clarified regarding the building design.
a. Clarify the type of system proposed for gutters and down sprouts.
b. Identify the material of the cornice line on the south and north elevations.
2
Page 33
HI-09-01 Dover “Anchor” Public Library
Architectural Review Recommendation Report from Historic District Commission
June 17, 2009 Meeting
Page 3 of 8
c. Clarify if there is a color patterning to the slate shingles (as depicted in the
color renderings).
4. Some of the site improvements/amenities were not specifically described with the
application information. Please provide information for consideration.
a. Identify the materials for the Reading Garden area including surface
pavement, wall detailing, benches or other seating, bicycle parking rack, etc.
b. Identify the design and materials of the retaining wall along the drive aisle
entrance from Innovation Way. Due to the size and scale of the wall, the
materials selected must be appropriate for use within the Historic District.
This location may be an opportunity for a public art project.
c. Identify areas where the sidewalks or portions of the sidewalks will be
constructed of brick. The use of brick paving materials for sidewalk
construction is a key feature found throughout the Historic District area. It
appears that several existing brick sidewalk areas will be removed or
reconfigured as part of this project.
5. The proposed future development of a building addition and redevelopment of the
corner property at East Loockerman Street and Innovation Way (current U.S. Post
Office site) is not part of this project review or approval (concept shown on plan
sheet A-100A). It will be the subject of a future application review.
6. For building construction, the requirements of the building code or fire code must
be complied with. Consult with the Chief Building Inspector and Office of the Fire
Marshal for these requirements. The resolution of these items can impact the site
design in some instances.
7. The proposed landscaping including tree plantings should be completed with species
appropriate to the site conditions including plantings within the bio-retention areas.
Consultation with the City’s arborist regarding the tree species selected is
recommended especially regarding the street trees.
8. The applicant should be aware of the potential for historic archaeological resources
which may include previous building locations, wells, privies, etc. on these
properties. The State Division of Historical & Cultural Affairs can provide technical
assistance when dealing with archaeological resources including previous studies at
the subject location.
9. In the event, that major changes and revisions to the building design and materials
or site plan occur in the finalization of the site plan contact the Department of
Planning and Inspections. These changes may require resubmittal for review by the
Historic District Commission.
10. This site development plan for this project is also subject to the application and
review process for Site Development Plan (Article 10 §2 of the Zoning Ordinance)
3
Page 34
HI-09-01 Dover “Anchor” Public Library
Architectural Review Recommendation Report from Historic District Commission
June 17, 2009 Meeting
Page 4 of 8
before the Planning Commission. Note: Additional technical items for compliance
with the Zoning Ordinance and other regulations may be identified during the Site
Plan Process. Review comments pertaining specifically to the Site Plan set will be
issued at that time.
11. The applicant shall be aware that Building Permits are required to proceed with
any construction activities on the property. The permit application must comply
with the approvals granted through the Architectural Review Certification process.
12. The applicant shall be aware that a Sign Permit is required to proceed with the
placement of signage on the property.
The following information was considered by the Historic District Commission in making their
recommendation including the initial recommendations made by Planning Staff in regards to the
application. Discussion at the Historic District Commission meeting also included questions
pertaining to exterior finish materials of the roof, light monitors, use of ashlar stone; color
choices; the ‘bookend’ forms; project impact on adjacent sidewalks; and signage, etc.
Property Information:
The subject site consists of several parcels of land predominately currently utilized as the
municipal parking lot between the City Hall and the U.S. Post Office. As part of the
improvements to site access and circulation for the project, several adjoining parking lots will
also be reconfigured.
The adjoining property to the north known historically as the Richardson & Robbins Building
(occupied by DNREC) is the southeastern boundary of the National Register of Historic Places
listed Victorian Dover Historic District (K-396). The properties along the East Loockerman
Street segment (The Plaza) including the existing City Hall, parking lot, and U.S. Post Office are
not within the Victorian Dover Historic District of the National Register.
The entire project site is located with the local Historic District Zone (H) and subject to the
provisions of the Zoning Ordinance, Article 3 §21 and referenced sections.
PROJECT PROPOSAL (Drawings dated 4/15/2009):
This proposal involves the construction of a two (2) story public library building of 46,000 S.F.
on the site of an existing parking lot. The brick building consists of two main forms: a rectilinear
“bar-like” form with a side gable roof and an oval form of predominately glass with a flat
roof/green roof system. The ends of the building are „bookended‟ by a wide bay clad in ashlar
stone with a large chimneylike form extending through the roof line.
The space between the library building and East Loockerman Street includes a Reading Garden
with lawn area, retaining wall, tree plantings and an access ramp. The main entrance to the new
library building is on the south side of the building facing East Loockerman Street. This same
4
Page 35
HI-09-01 Dover “Anchor” Public Library
Architectural Review Recommendation Report from Historic District Commission
June 17, 2009 Meeting
Page 5 of 8
entrance lobby is also accessible on the north side of the building from the large parking lot. The
entrances are highlighted with the use of a flat aluminum awning and precast stone covered
columns supporting a sawn stone lintel. Also on the south elevation, the two tiered oval form
portion of the building consists mainly of glass broken by a series of brick piers.
The predominant exterior finish materials for the library building are brick and ashlar stone
veneer with the wall detailing provided through the use of brick patterning and sawn stone
elements. Brick detailing and changes in the stone veneer mark the watertable on the building
with a similar pattern noting the transition to the second floor. A heavy cornice line indicates the
transition to the gable roof which is clad in slate shingles. The window openings use clear glass
with aluminum framed curtain wall systems construction for the large openings and aluminum
double hung windows and single windows for the smaller openings. At the roof level, four sets of
paired light monitors bring northern light into the building. These light monitors are also to be
clad with slate shingles.
The height is almost 52 feet from the finished first floor to the ridge peak of the roof with the
bookend elements and light monitors reaching an overall height of just over 58 feet. Per the
Zoning Ordinance the height would be calculated as 41 feet 9¼ inches (average between the eave
and roof ridge). A series of elevation drawings place this building in comparison with existing
buildings in the immediate area i.e. the City Hall Building and Post Office Building. Most
notable is that the cornice line of the new library building is held relatively as the same height as
its neighboring buildings.
The location of mechanical equipment for the library appears to be within the building with some
below grade exterior equipment.
The project also includes site improvements ranging from parking lot reconfiguration to
landscaping. The parking lot improvements include landscaped islands planted with trees or
shrubs. The Reading Garden on the south side of the building introduces a patterning of surface
materials and landscape plantings (trees and shrubs) with opportunities for outdoor seating.
Several existing tress will be retained between City Hall and the new library building. New street
trees are also proposed along East Loockerman Street.
See attached elevation drawings, site plan drawings, and project overview booklet for detailed
information on building dimensions, locations, and material choices.
Review of DESIGN STANDARDS AND GUIDELINES
The subject project site is located in the Dover Historic District Zone within Capitol Square
historic context. The Capitol Square historic context is described on pages 2-8 through 2-9.
Location within the Dover Historic District Zone requires proposals for demolition, new
construction, additions, and certain renovation or rehabilitation activities to existing buildings to
receive an Architectural Review Certificate.
5
Page 36
HI-09-01 Dover “Anchor” Public Library
Architectural Review Recommendation Report from Historic District Commission
June 17, 2009 Meeting
Page 6 of 8
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone,
an Architectural Review Certificate will be granted “if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement location and materials affecting the
exterior appearance are generally in harmony with neighboring structures and complementary to
the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2,
the Historic District Commission will provide a recommendation to the Planning Commission
regarding the project‟s compliance with the architectural review standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in
Chapter 4: New Construction, Additions, Demolition and Relocation. For the new library
building, the applicable review considerations are those associated with “New Construction.”
Information on the proposed project and the review considerations is given below.
New Construction
The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8)
provide the design criteria and development guidelines. The guidelines specify the following
individual considerations for new construction to be considered in the review by the Historic
District Commission (and Planning Commission) of the project for Architectural Review
Certification:
Style
Scale (building to reflect dominant cornice and roof height of adjacent buildings)
Elevation of the First Floor
Floor-to-Floor heights
Bays, windows and doors (size, relationship, spacing of)
Absolute Size (compare overall size of new building)
Massing (relationship of solid-to-void)
Orientation (location of primary façade)
Proportions (comparison of height to width of building and elements)
Materials
Forms (shape of building and roof to be complementary)
Siting (location of building on lot and in relation to street)
High density/ large-scale construction
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, lot
coverage, height, etc. This Proposal for the new library building appears to conform to the bulk
requirements of the I-O Zoning District including setbacks, building height, floor area ratio, and
lot coverage. The City of Dover Zoning Ordinance authorizes the Historic District Commission
to waive certain bulk standards when issuing its recommendation to the Planning Commission
for an Architectural Review Certificate if necessary.
STAFF COMMENTS AND RECOMMENDATIONS
The following are Staff comments and recommendations for this application regarding project
activities and Architectural Review Certification.
6
Page 37
HI-09-01 Dover “Anchor” Public Library
Architectural Review Recommendation Report from Historic District Commission
June 17, 2009 Meeting
Page 7 of 8
1. Staff recommends conditional approval of the Architectural Review Certificate for the
construction of the library building project finding the overall building to be of a
contemporary design yet compatible with the buildings of the Capitol Square context of
the Historic District.
2. These conditions are recommended by Staff to improve the project‟s compliance with the
recommended guidelines of the Design Standards and Guidelines. The following are
recommended conditions:
a. Any revisions or changes in the identified materials may be subject to further
review by the Historic District Commission.
b. The selected brick choices should be compatible to the brick of other existing
buildings in the area.
c. Consider options for the cladding and detailing of the roof light monitors.
d. Signage identifying the library should be integrated into the building and site
design. Consideration of any free standing signage may require additional review.
e. Light fixtures/poles should continue style of the lighting used in the Capitol
Square area or Downtown Loockerman Street areas. A taller two-light style
fixture may be more appropriate within the parking lot areas.
f. Identify the landscaping for the improved parking lot reconfiguration and its
entrance from King‟s Highway.
3. The following items should be clarified regarding the building design.
a. Clarify the type of system proposed for gutters and down sprouts.
b. Identify the material of the cornice line on the south and north elevations.
c. Clarify if there is a color patterning to the slate shingles (as depicted in the color
renderings).
4. Some of the site improvements/amenities were not specifically described with the
application information. Please provide information for consideration.
a. Identify the materials for the Reading Garden area including surface pavement,
wall detailing, benches or other seating, bicycle parking rack, etc.
b. Identify the design and materials of the retaining wall along the drive aisle
entrance from Innovation Way. Due to the size and scale of the wall, the materials
selected must be appropriate for use within the Historic District. This location
may be an opportunity for a public art project.
c. Identify areas where the sidewalks or portions of the sidewalks will be constructed
of brick. The use of brick paving materials for sidewalk construction is a key
feature found throughout the Historic District area. It appears that several existing
brick sidewalk areas will be removed or reconfigured as part of this project.
5. The proposed future development of a building addition and redevelopment of the corner
property at East Loockerman Street and Innovation Way (current U.S. Post Office site) is
not part of this project review or approval (concept shown on plan sheet A-100A). It will
be the subject of a future application review.
7
Page 38
HI-09-01 Dover “Anchor” Public Library
Architectural Review Recommendation Report from Historic District Commission
June 17, 2009 Meeting
Page 8 of 8
6. For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector and Office of the Fire Marshal
for these requirements. The resolution of these items can impact the site design in some
instances.
7. The proposed landscaping including tree plantings should be completed with species
appropriate to the site conditions including plantings within the bio-retention areas.
Consultation with the City‟s arborist regarding the tree species selected is recommended
especially regarding the street trees.
8. The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on these properties. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing
with archaeological resources including previous studies at the subject location.
9. In the event, that major changes and revisions to the building design and materials or site
plan occur in the finalization of the site plan contact the Department of Planning and
Inspections. These changes may require resubmittal for review by the Historic District
Commission.
10. This site development plan for this project is also subject to the application and review
process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before the
Planning Commission. Note: Additional technical items for compliance with the Zoning
Ordinance and other regulations may be identified during the Site Plan Process. Review
comments pertaining specifically to the Site Plan set will be issued at that time.
11. The applicant shall be aware that Building Permits are required to proceed with any
construction activities on the property. The permit application must comply with the
approvals granted through the Architectural Review Certification process.
12. The applicant shall be aware that a Sign Permit is required to proceed with the placement
of signage on the property.
Historic District Commission Action on June 17, 2009
The Historic District Commission considered the proposal and provided a recommendation to the
Planning Commission in regards to the Architectural Review Certification for the project site
development plan. The recommendation involved consideration of the Design Standards and
Guidelines. The specific conditions of the recommendation are noted in the Report under the
heading “Recommendation of the Historic District Commission.”
8
Page 54
City of Dover
ARCHITECTURAL REVIEW REPORT
Review of Alternative Materials Request
Recommendation of the Dover Historic District Commission
Meeting of July 21, 2011
For Consideration by the Dover Planning Commission
Meeting of August 15, 2011
Application: State Street Commons, HI-05-03 and S-06-19
Location: Southwest corner of South State Street and Water Street, Dover
502 South State Street, 508-518 South State Street, and Water
Street
Current Request for Review:
A request from the Onix Group has been received regarding the State Street Commons project.
Their request is for the use of an alternative material for the building entrance railings at the
porches and porticos on the new building. They are seeking approval to allow the use of a white
vinyl (PVC) handrail system for the entrance railings as installed by the project developer. A
letter dated July 7, 2011 is presented for Review and Action on the Architectural Review
Certification by the Planning Commission. See attached documents.
RECOMMENDATION OF THE HISTORIC DISTRICT COMMISSION:
At their July 21, 2011 meeting, the Historic District Commission reviewed the revised submission
pertaining to the use of an alternative material for the building entrance railings at the porches and
porticos on the new building. The following members were present: Chairman Dick Scrafford,
Mr. Terry Jackson, Mr. Chaz Salkin, Mr. Joe McDaniel, and Mr. George Fisher. The revised
submission was represented by Constantine Malmberg, representing the applicant Onix Z.
Action Taken by Historic District Commission: The motion on the recommendation passed 5-0
of the members present. The Historic District Commission recommends that the white PVC
(vinyl) railing system be replaced with a black metal railing system throughout (for all
entrance railings) and that the landscape plantings be designed to be appropriate to the
structure and location without consideration of blocking the railings.
This Recommendation is forwarded to the Planning Commission for the final action on the
revised Architectural Review Certification.
The following information was considered by the Historic District Commission in marking their
recommendation including the initial recommendations made by Planning Staff in regards to the
revised submission. See also attachments of the previous Recommendation Report for the project
and meeting minutes. Discussion at the Historic District Commission meeting also material
options and appearance of a black metal railing system and a white vinyl railing system,
landscaping between the sidewalk and railing, and project status.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 55
HI-05-03 State Street Commons: Update & Request for Use of Alternative Materials
Architectural Review Recommendation Report from the Historic District Commission
From July 21, 2011 Meeting
Page 2 of 4
Project History:
In March 2006, the Historic District Commission conducted a public hearing and took action in
order to make a recommendation on the Architectural Review Certificate for the State Street
Commons project. Construction later commenced on two connected 2 ½ story office buildings of
12,000 S.F. each for a total of 24,000 S.F with a two level parking garage. The existing brick
office building at 502 South State Street consisting of 3,222 S.F. also remains. The property
consists 35,061 square feet ± of land zoned RG-O (General Residence and Office Zone) and
subject to the H (Historic District Zone). The property is located at the southwest corner of
South State Street and Water Street. The owner of record is YOZIMA, LLC; request received
from Onix-Z, LLC.
As presented in March 2006 (drawings dated 10/14/05 and 1/10/06), the proposed new buildings
were shown with elevated first floor entries which necessitated a railing system for the steps and
associated porch or portico areas. The specific material is not listed on the elevation drawings
presented to the Historic District Commission. Metal railings are specifically shown on the
drawings and discussed for the parking garage wall.
There were no exterior changes proposed for the existing brick building at 502 South State
Street; it has metal railings at its front entrance. No changes are proposed with this request for the
building at 502 South State Street.
Architectural Review Certification Review and Action:
Following a presentation on the project, the discussion at the Historic District Commission
meeting of March 16, 2006 also included questions pertaining parking garage access, siding
material choices, finish floor height of the first floor, and the requested waivers for the project.
The Historic District Commission recommended approval of the Architectural Review
Certificate for the State Street Commons project including the setback and floor area ratio
waivers and recognized a series of comments and recommendations (Items #1-12) as conditions.
(See the attached copies of the Architectural Review Certification Recommendation Report and
Meeting Minutes.)
On June 20, 2006, after a public hearing and review the Planning Commission granted approval
of the Architectural Review Certificate for the State Street Commons project following the
recommendations of the Historic District Commission. (See attached excerpt of Meeting
Minutes.) The Final Site Development Plan approval was granted on June 17, 2008 and the
Building Permit #08-1193 was then issued for construction of the building shell (no interior fit-
out). The construction plans submitted and approved as part of the Building Permit identifies the
railing system for the building entrances as a metal stair railing with the larger columns (one
entry with round columns and second entry in square columns) in a molded woodwork product
(Fibertech). The railing at the top of the mansard roof on the end units (trim system #1) was
identified to be constructed of a molded woodwork product and the railing on the brick wall of
the garage was identified as a metal railing. To date the building has not completed construction
and a Certificate of Occupancy has not been issued. The applicant has also has other site
compliance issues to address.
2
Page 56
HI-05-03 State Street Commons: Update & Request for Use of Alternative Materials
Architectural Review Recommendation Report from the Historic District Commission
From July 21, 2011 Meeting
Page 3 of 4
Review of DESIGN STANDARDS AND GUIDELINES
Location within the Dover Historic District Zone requires proposals for demolition, new
construction, additions, and certain renovation or rehabilitation activities to existing buildings to
receive an Architectural Review Certificate. As stated in the Design Standards and Guidelines
for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted
“if it is found that the architectural style, general design, height, bulk and setbacks, arrangement
location and materials affecting the exterior appearance are generally in harmony with
neighboring structures and complementary to the traditional architectural standards of the historic
district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a
recommendation to the Planning Commission regarding the alternative materials request and its
compliance with the architectural review standards.
This request for alternative materials must be reviewed for conformity with the design criteria
guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation. For the
new buildings, the applicable review considerations are the design criteria and development
guidelines associated with “New Construction” (Chapter 4: pages 4-1 through 4-8). “Materials”
is one of the guidelines for new construction to be considered in the review by the Historic
District Commission (and Planning Commission) of the project for Architectural Review
Certification. Other guidelines focus on style, scale, elevation of the first floor, floor-to-floor
heights, bays, windows and doors, absolute size, massing, orientation, proportions, forms, siting,
and high density/large scale construction.
Porches and Steps are discussed on pages 3-16 through 3-20.Staff notes that the Design
Standards and Guidelines do not specifically discuss the use of vinyl (PVC) materials and other
similar composite materials to replicate features traditionally made of wood.
STAFF COMMENTS AND RECOMMENDATIONS
The following are Staff comments and recommendations for this submission requesting the use
of alternative materials for the project and Architectural Review Certification.
1. Staff recommends conditional approval of the revised Architectural Review Certificate
pertaining to the use of alternative materials (white PVC Railing System). While the vinyl
materials can replicate the form of railings (handrail and balustrade elements) for porches
and porticos, the material may not be appropriate for use in all areas of the Historic
District and therefore must be evaluated for each project and property location. This
project is located on the edge of the Historic District and is proposed for use on a new,
modern building construction project. The following conditions on the use of vinyl
materials for this project are suggested:
a. The existing white PVC railing system may remain for those units where the
railing system is integrated with and connected to a column system supporting a
porch roof.
b. The „free-standing‟ railing system on the two end units of the buildings (on each
frontage) is recommended to be changed to the black metal railing system.
c. Require the establishment of landscape plantings minimize the visual impact of
the vinyl railing system. Careful selection of the plantings will be necessary due to
3
Page 57
HI-05-03 State Street Commons: Update & Request for Use of Alternative Materials
Architectural Review Recommendation Report from the Historic District Commission
From July 21, 2011 Meeting
Page 4 of 4
space limitations and to avoid conflicts with utilities and stormwater facilities.
On-going care and maintenance trimming will be necessary of any plantings.
d. The design detail information on the railing system and the landscape plantings
proposal must be submitted to the Planning Office for review.
2. Any revisions or changes in the identified materials may be subject to further review by
the Historic District Commission.
3. In utilizing the alternative materials, the requirements of applicable the building code or
fire code must be complied with. Consult with the Chief Building Inspector and Office of
the Fire Marshal for these requirements and any requirements for the submission and
review and approval process for addendums to the Building Permit which may be
necessary with this change in materials. Proper installation of the materials is also
important.
4. In the event, that major changes and revisions to the building design and materials or site
plan are proposed contact the Department of Planning and Inspections. These changes
may require resubmittal for review by the Historic District Commission.
5. It is noted that action on this specific element of the project does not confirm that all
aspects of the project are in compliance with the permits, Site Plan approvals, or
Architectural Review Certification previously issued. The buildings are subject to
Certificate of Occupancy inspections to confirm compliance.
a. The other exterior detailing elements of the new buildings such as, but not limited
to, the installation of shutters, rooftop railing, landscaping, etc. must be
implemented.
Attachments:
Letter of 7/7/2011 from Onix Group
HI-05-03 Architectural Review Certification Recommendation Report
Meeting Minutes of March 16, 2006 Historic District Commission Meeting
Meeting Minutes of June 20, 2006 Planning Commission Meeting
Current Photographs of Project
Elevation Drawings, revision date 1/10/2006
4
Page 60
ARCHITECTURAL REVIEW STAFF REPORT
Before Dover Historic District Commission
March 16, 2006
Location: 502, 508, 512 and 516-518 South State Street
Tax Parcels: ED-05-077.09-03-70.00-000
ED-05-077.09-03-71.00-000
ED-05-077.09-03-72.00-000
ED-05-077.09-03-73.00-000
Owner: YOZIMA, LLC
Present Zoning: RGO- General Residence and Office Zone
H- Historic District Overlay Zone
Present Use: 502 – Office Building
(508, 512, and 516-518 Residential dwellings demolished in July 2005)
Proposed Use: 502 – Office Building
Two Office Buildings (new construction) and associated two-level
parking garage
File Number: HI-05-03
Project Description:
The Historic District Commission will act on a recommendation to the City of Dover Planning
Commission for Architectural Review Certificate for the project known as State Street
Commons. This application consists of the construction of two 2 ½ story office buildings of
12,000 S.F. each for a total of 24,000 S.F. The application also includes a two level parking
garage providing 73 parking spaces on the site. The existing brick office building at 502 South
State Street consisting of 3,222 S.F. will remain. The property consists of four parcels of land
totaling 35,061 square feet ± of land zoned RG-O (General Residence and Office Zone) and
subject to the H (Historic District Zone). The property is located at the southwest corner of
South State Street and Water Street. The owner of record is YOZIMA, LLC. The property
addresses are 502 South State Street, 508 South State Street, 512 South State Street, and 516-518
South State Street.
Property Information:
A series of four buildings was located on the west side of South State Street south of the
intersection of South State Street and Water Street. The first building (502 South State Street) at
the corner currently serves as an office building. The building at 502 South State Street is listed
in the National Register of Historic Places as a contributing resource of the Dover Green Historic
District (K-394.95 and K-219). The building description from the nomination is provided below.
Page 61
HI-05-03 State Street Commons
Architectural Review Staff Report for Historic District Commission
March 16, 2006 Meeting
502 State Street-James Bellach House/Christ Church Rectory - 1771; brick-Flemish bond, 2 1/2 story, 5
bay. This Federal dwelling has a gable roof. The cornice has scroll-like modillions. There is a double
interior gable end chimney on the south side. The structure has a wide belt course between the first and
second floors. The doorway is very elaborate. The door and rising sun fanlight, with curved tracery, are
recessed. The frontispiece has fluted columns with elongated capitals and a dental gable with cornice
return. Above the fanlight is a rounded arch with a keystone.
The other three residential dwellings buildings fronting on State Street were demolished in July
2005 without the proper permits. A report entitled “Historic Documentation of 508, 512, 516-518
South State Street” dated August12, 2005 is available for review at the Department of Planning
& Inspections. It provides information on the ownership, history, floor plans, photographs, etc. of
these three buildings. These buildings 508, 512, and 516-518 South State Street were also
contributing resources of the National Register Historic District (K-394.96, K-394.97, and K-
394.98).
This entire project site is located with the local Historic District Zone (H).
This 35,061 S.F. site (total of four parcels) was the subject of a previous application known as
HI-02-06 Water Street Office Plaza II and also Site Plan S-03-09 Water Street Office Plaza II.
PROJECT PROPOSAL (Drawings dated 10/14/05 and 1/10/06):
This proposal involves the construction of two 2 ½ story office buildings of 12,000 S.F. each for
a total of 24,000 S.F. One building fronts on South State Street and consists of five units. The
units are attached in the appearance of townhouses. Each unit has a first floor entry elevated
about four feet above the sidewalk. The exterior finishes consist of brick to a watertable height
with either brick, stucco, or horizontal wood siding above and topped with a standing seam metal
roof. Details include window trimwork, shutters, door trimwork surrounds, covered entries by
pitched roof supported by columns, dormers, etc. The second building fronts on Water Street and
also consists of five units following the same exterior material choices and detailing.
This application also includes a two level parking garage providing seventy-three (73) parking
spaces on the site. The garage is screened from State Street and Water Street by the buildings.
Along the west property line, this project is proposed to share a driveway with the adjacent
property for access. The parking garage has a lower level and an upper level each with its own
entry point. The upper level of the parking garage is elevated about four feet above the level of
the South State Street. This difference in height results in a brick wall along the south property
line. This wall is clad in brick with no detail elements or surface changes. It is topped with a
metal railing.
The existing brick office building at 502 South State Street consisting of 3,222 S.F. will remain.
A sidewalk connection from each street is provided between this existing building and the
proposed buildings.
See attached elevation and section drawings and site plan drawings for detailed information on
building dimensions, locations, and material choices.
2
Page 62
HI-05-03 State Street Commons
Architectural Review Staff Report for Historic District Commission
March 16, 2006 Meeting
Review of DESIGN STANDARDS AND GUIDELINES
The subject property is located in the Dover Historic District Zone within The Green historic
context. The historic context is described on pages 2-3 through 2-5. Location within the Dover
Historic District Zone requires proposals for demolition, new construction, additions, and certain
renovation or rehabilitation activities to existing buildings to receive an Architectural Review
Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone,
an Architectural Review Certificate will be granted “if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement location and materials affecting the
exterior appearance are generally in harmony with neighboring structures and complementary to
the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2,
the Historic District Commission will provide a recommendation to the Planning Commission
regarding the project’s compliance with the architectural review standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in
Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the
proposed project and the review considerations is given below.
New Construction
The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 thru 4-8)
provide the design criteria and development guidelines. The guidelines specify the following
individual considerations for new construction to be considered in the review by the Historic
District Commission (and Planning Commission) of the project for Architectural Review
Certification:
Style
Scale (building to reflect dominant cornice and roof height of adjacent buildings)
Elevation of the First Floor
Floor-to-Floor heights
Bays, windows and doors (size, relationship, spacing of)
Absolute Size (compare overall size of new building)
Massing (relationship of solid-to-void)
Orientation (location of primary façade)
Proportions (comparison of height to width of building and elements)
Materials
Forms (shape of building and roof to be complementary)
Siting (location of building on lot and in relation to street)
High density/ large-scale construction
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, lot
coverage, height, etc. This Proposal for the new office buildings does not conform to several of
the bulk requirements of the RG-O Zoning District and requires waivers from the Historic
District Commission. The City of Dover Zoning Ordinance authorizes the Historic District
3
Page 63
HI-05-03 State Street Commons
Architectural Review Staff Report for Historic District Commission
March 16, 2006 Meeting
Commission to waive certain bulk standards when issuing its recommendation to the Planning
Commission for an Architectural Review Certificate.
The waivers* requested by the project:
Request Bulk Standard Ordinance Applicant proposal Building
requirements
1 Front Yard 30 feet 5 feet S. State St. Building
Setback Water St. Building
2 Side Yard/ 15ft < 3 feet Parking Garage
Rear Yard setback 20ft
3 Floor Area Ratio 0.50 0.091 Existing building Entire site
0.684 Proposed buildings
0.78 Site total
*Note: The overall lot coverage of the site within the RGO Zoning district is limited to 85%.
This Site Plan indicates a lot coverage of 84.7%.
STAFF COMMENTS AND RECOMMENDATIONS
The following are Staff comments and recommendations for this application regarding project
activities and Architectural Review Certification.
1. Staff recommends conditional approval of the Architectural Review Certificate for the
construction of the project. These conditions are recommended by Staff to improve the
project’s compliance with the recommended guidelines of the Design Standards and
Guidelines. The following are recommended conditions:
a. Clarify the building footprint versus the building front elevations and entrance
door/stairs. The Site Plan indicates an indention in the building façade which
does not appear to follow the elevation drawings and there differences in the
location of the entry doors to each unit.
b. Clarify the roof pitch on each unit of the proposed building.
c. Windows are recommended to be double hung windows with true divided light
panes or stimulated divided light system (not snap-in grills). Clarify the window
specifications.
d. The porch-like area (shed roof , columns, and railing) on the east end of the Water
Street Building (unit 6) should be extended south to fully cover the access stairs
down to the parking garage lower level.
e. Add details such as engaged columns/pilasters to divide the exposed south wall of
the parking garage to avoid the large expanse of blank wall. These column
elements could be extended higher to become part of the metal railing system.
f. The material choice and details of the metal railing system must be provided. It is
recommended to divide it intermittently with a larger support posts inserted at
sections of the metal railing and to use a black colored/painted metal railing.
g. The applicant is encouraged to contact the adjacent property owner to the south to
discuss removal of the existing chainlink fence with white slats and the
opportunity to provide additional landscaping in this area. It is anticipated that site
4
Page 64
HI-05-03 State Street Commons
Architectural Review Staff Report for Historic District Commission
March 16, 2006 Meeting
construction activities for the parking garage and wall along this location will
affect the fence; therefore, necessitating a construction easement.
h. The west wall of the parking garage should also include greater detail. Additional
detailing or ornamentation is recommended in the form of a column, engaged
pilaster, etc. to define and provide added protection at the entrance corners. The
header across to top of the lower level garage entrance should be detailed.
i. Size and material details must be provided for the Dumpster enclosure on the
upper level of the parking garage. Access to this location may be a concern.
2. Staff requests the Project Engineer to re-calculate the total lot coverage for this project to
confirm the 84.7%. The plan appears to have greater impervious lot coverage with the
buildings, sidewalks, and parking garage areas. If the lot coverage is greater than 85% a
waiver is required.
3. For building construction, the separation distances and other requirements of the building
code or fire code must be complied with. Consult with the Chief Building Inspector for
these requirements. The resolution of these items may impact the site design including
such items as building setbacks from property line, building dimensions and height,
building openings, and fire protection needs, etc.
4. The proposed landscaping including tree plantings should be completed with species
appropriate to the site conditions especially the planter locations on the upper level of the
parking garage and consideration of the impact to the lower level parking garage.
5. The location of mechanical equipment should be identified. The mechanical equipment
should be enclosed with appropriate screening devices such as appropriately scaled walls,
landscaping, roof mounting, or other similar treatments to screen it from the public right-
of-way.
6. The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on these properties. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing
with archaeological resources.
7. Documentation of the cross access easement with the adjacent property owner must be
provided for the proposed sharing of the driveway access from Water Street to access to
this site and its parking garage.
8. The request for a reduction in the required number of parking spaces must be reviewed
and approved by the Planning Commission. The Site Plan must comply with the Code
requirements unless a waiver is specifically granted.
9. In the event, that major changes and revisions to the site plan occur in the finalization of
the site plan contact the Department of Planning and Inspections. These changes may
require resubmittal for review by the Historic District Commission.
5
Page 65
HI-05-03 State Street Commons
Architectural Review Staff Report for Historic District Commission
March 16, 2006 Meeting
10. This site development plan for this project is also subject to the application and review
process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before the
Planning Commission. Note: Additional technical items for compliance with the Zoning
Ordinance and other regulations may be identified during the Site Plan Process.
11. The applicant shall be aware that Building Permits are required to proceed with any
construction activities on the property. The permit application must comply with the
approvals granted through the Architectural Review Certification process.
12. The applicant shall be aware that a Sign Permit is required to proceed with the placement
of signage on the property.
Historic District Commission Action Required
The Historic District Commission shall consider the proposal and provide a recommendation to
the Planning Commission in regards to the Architectural Review Certification for the project site
development plan. The recommendation should reflect consideration of the Design Standards
and Guidelines.
6
Page 77
NOTICE
Dover Planning
Commission Action
Site Development Plan
PROPERTY ADDRESS
APPLICATION #
Public comment will be received at a Public
Hearing on
Month, DATE 00, YEAR, at 7:00 PM
in the Council Chambers at City Hall at 15
Loockerman Plaza, Dover, DE 19901
Additional information regarding this application is available at the
Dover Planning Office, located in City Hall.
(302) 736-7196
DO NOT REMOVE THIS SIGN FROM THESE PREMISES UNTIL AFTER THE ABOVE-
LISTED DATE UNDER PENALTY OF LAW
Page 78
NOTICE
Proposed REZONING
Action
A request to rezone
PROPERTY ADDRESS
from ORIGINAL ZONING to PROPOSED
ZONING
Has been filed with the City of Dover
Planning Department
Public comment will be received by Planning
Commission at a Public Hearing on
Month, DATE 00, YEAR at 7:00 PM
and by City Council on
Month, DATE 00, YEAR, at 7:30 PM
in the Council Chambers at
City Hall at 15 Loockerman Plaza, Dover, DE 19901
Additional information regarding this application is available at the
Dover Planning Office, located in City Hall.
(302) 736-7196
DO NOT REMOVE THIS SIGN FROM THESE PREMISES UNTIL AFTER THE ABOVE-LISTED DATE UNDER PENALTY
OF LAW
Page 79
PETITION TO AMEND AND ZONING DISTRICT
Public Hearing before the
Dover Planning Commission
August 15, 2011
Applicant/Owner: Harrington Commercial, LLC
Address: 601 Fulton Street, Dover
Location: North side of Fulton Street between Ridgely Street and the railroad
corridor
Tax Parcel ID #: ED05-076.08-01-14.00-000
Size: 0.486 +/- acres (21,170 S.F.)
Present Use: Ambulance services
Proposed Use: Ambulance services/Contractor’s yard
Comprehensive
Plan Designation: Industrial
Present Zoning: M (Manufacturing Zone)
Proposed Zoning: C-3 (Service Commercial Zone)
Reason for Request: To more closely align the zoning of the property with the
current/proposed use on the site.
File Number: Z-11-05
Page 80
Z-11-05 Lands of Harrington Commercial Realty at 601 Fulton Street
DAC Report– August 4, 2011
Page 2 C
I P
T L
Y A
CITY OF DOVER N
O N
DEVELOPMENT ADVISORY COMMITTEE F I
N
APPLICATION REVIEW COMMENTARY D G
O
V
D.A.C. MEETING DATE: August 4, 2011
E
R
APPLICATION: Lands of Harrington Commercial Realty at 601 Fulton Street –
Proposed Rezoning from M to C-3
FILE#: Z-11-05 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSON: Ann Marie Townshend, AICP PHONE#: 736-7196
This rezoning application consists of one parcel of land, of approximately 0.486 acres, owned by
Harrington Commercial Realty, LLC. The property is currently M (Manufacturing). The
proposed zoning is C-3 (Service Commercial). The subject property is located on the north side
of Fulton Street, directly west of the railroad tracks. Tax Parcel: ED-05-076.08-01-14.00-000.
Existing Property:
The property currently houses Prime Care Medical Transport ambulance service in the west side
of the building. This was reviewed by the Planning Commission in November 2009 (C-09-08).
The east side of the building consists of several garage bays that were not renovated or occupied
along with the Prime Care location into this building.
Surrounding Land Uses:
There are a variety of zoning classifications surrounding the subject property, but all are
industrial or light industrial in nature. The immediately adjacent property to the north and west is
zoned IPM (Industrial Park Manufacturing). The property to the south across Fulton Street is
zoned M (Manufacturing), as is the property to the east across the railroad tracks. There are
several properties within the adjacent area that are zoned C-3 (Service Commercial).
Comprehensive Plan:
In the 2008 Comprehensive Plan, the Land Development Plan (Map 12-1 as amended, dated
3/14/2011) recommends that this property be used for Industrial and Public Utilities Uses. Both
the existing and proposed zoning classifications are consistent with this land use classification,
according to Table 12-1: Land Use and Zoning Matrix.
Request for C-3 (Service Commercial)
The types of permitted uses in the C-3 (Service Commercial) are given Article 3 §15 of the
Zoning Ordinance. The permitted uses include service establishments including dry cleaning and
laundry plants; wholesale, storage, and warehousing establishments; bowling alleys, and animal
Page 81
Z-11-05 Lands of Harrington Commercial Realty at 601 Fulton Street
DAC Report– August 4, 2011
Page 3
hospitals; motor vehicle, boat or farm equipment sales or service; motor vehicle service stations
with restrictions; manufacturing, assembling, converting, altering, finishing, cleaning or any
other processing of products for sale on or off the premises, provided that not more than 25
persons shall be engaged in such activity; and provided further, that any such use shall be subject
to the performance standards procedures as set forth in Article 5 §8; newspaper and job printing;
and ministorage facilities with restrictions.
Article 4, Section 4.15 of the Zoning Ordinance addresses the bulk standards for the C-3 Zone.
The bulk standards are as follows:
C-3 (Service Commercial Zone)
Minimum required:
Lot area
Lot width (ft.) 100
Lot depth (ft.) 100
Front yard (ft.) 25
Side yard (ft.) 20
Rear yard (ft.) 10
Side or rear yards which adjoin a
30
residence zone (ft.)
Off-street parking
Per 300 sq. ft. floor area or 1
Per employee (whichever is greater) 1
Maximum permitted:
Building height
Stories 2
Feet 30
Floor area ratio 0.5
Lot coverage 0.5
Recommendation of the Planning Staff:
This request is to rezone land from M (Manufacturing) to C-3 (Service Commercial). Staff
supports the applicant’s request, as the request is consistent with the 2008 Comprehensive Plan
as amended, and there is other C-3 (Service Commercial) zoning in the surrounding area. The C-
3 (Service Commercial) and M (Manufacturing) zones allow for many of the same uses;
however, all uses within the M (Manufacturing) zone are subject to Conditional Use approval by
the Planning Commission.
Page 82
Z-11-05 Lands of Harrington Commercial Realty at 601 Fulton Street
DAC Report– August 4, 2011
Page 4
This recommendation is being made without that benefit of hearing the comments of surrounding
landowners and residents. A public hearing is required on this matter and the Planning
Commission should give those comments consideration.
ADVISORY COMMENTS TO THE APPLICANT:
1) Prior to establishing any use on the subject property, including within the existing building,
the applicant shall contact the Planning Office so that the appropriate review process can be
determined and coordinated with other reviewing entities, including the Fire Marshal’s
Office, Public Utilities, and the Chief Building Inspector.
2) The applicant shall be aware that approval of any rezoning application does not represent Site
Development Plan or Record Plan approval. A separate Site Development Plan must be
submitted and approved if development activities are proposed on the property.
3) The applicant shall be aware that approval of any rezoning application does not represent a
Building Permit or other construction activity permit approval. A separate application
submission showing all improvements is required before issuance of permits by the City of
Dover.
4) All businesses operating in the City of Dover are required to obtain a City of Dover Business
Licenses from the Licensing and Permitting Division located in City Hall.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Office as soon as possible.
Page 83
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JULY 28, 2011
APPLICATION: LANDS OF HARRINGTON COMMERCIAL: 601 FULTON ST.
FILE #: Z-11-05
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER
1. Our office has no objection to the rezoning of tax parcel ED05-076.08-01-14.00-000.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER
1. Should this site be redeveloped, which includes modifications to the use, the applicant / developer will be responsible
for all costs associated with providing the appropriate meter / service / main to this site based upon the use including
any necessary system upgrades or extensions. The appropriateness and adequacy of water and sewer services and
meters will be assessed at that time. Should the existing services no longer be required based upon the proposed
use, they must be properly abandoned at the mains in accordance with all City of Dover Public Utilities Department
standards and specifications.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 84
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: D S
O H
V A
E L
R
APPLICATION: Lands of Harrington Commercial 601 Fulton St.
FILE #: Z-11-05 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
Any gas fired HVAC equipment must be equipped with emergency cut off switches remotely
located.
Address numbers of at least 12 inches in height must be placed on the street side of the building
visible from the street.
Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection.
Full building and fire plan review is required.
Building cannot be occupied or construction or renovations started until completion of building
and fire plan review.
Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
Page 85
After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
All comments from this office, approved by the Planning Commission are at the expense of the
owner/applicant.
The proposed building will be reviewed under Business /Storage Occupancy.
The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all other
NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan be
submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 86
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: July 28, 2011 T
===============================================================
APPLICATION: Lands of Harrington Commercial at 601 Fulton Street
FILE#: Z-11-05 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. The Department has no comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 87
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
DEVELOPER APPLICATION MEETING DATE: AUGUST 2011
APPLICATION: Lands of Harrington Commercial
FILE #: Z-11-05
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE
FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Kent Conservation District has no objection to re-zoning plan for the above referenced site.
ADVISORY COMMENTS TO THE APPLICANT:
The Following comments are advisory and apply to the development of a detailed site plan for this project.
1. If at any time expansion or earth disturbing activity (clearing, grubbing tree clearing etc.) takes place and
exceeds 5000 square feet; a detailed Sediment and Stormwater Management Plan must be submitted and
approved to the Kent Conversation District.
Page 88
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF August 4, 2011
PLANNING COMMISSION MEETING OF August 15, 2011
Plan Title: McDonald’s
US-11-02
Plan Type: Unified Comprehensive Signage Plan
Property Location: North side of Holiday Boulevard, west of North DuPont Hwy.
(U.S. Route 13) south of Scarborough Road (State Route 1)
Property Address: 1788 North DuPont Highway
Tax Parcel: ED-05-057.01-02-02.00-000
Owner: K W North, LLC
Site Area: 4.9 acres +/-
Existing Signs: 3 wall signs – to be removed
3 directional signs – to remain
1 pylon sign – to remain
Proposed Signs: Number: 5 (5 walls sign)
Square Feet: 123
Zoning Classification: C-4 (Highway Commercial Zone)
Roadway Classification: North DuPont Highway – Urban Principal Arterial
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 89
C P
CITY OF DOVER I L
T A
DEVELOPMENT ADVISORY COMMITTEE Y N
N
APPLICATION REVIEW COMMENTARY O I
F N
D.A.C. MEETING DATE: August 4, 2011 G
D
O
V
APPLICATION: McDonald’s Unified Comprehensive Sign Plan E
R
FILE #: US-11-02 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Janelle M. Cornwell, AICP PHONE #: (302) 736-7010
PLAN SUMMARY:
This is an application to the Planning Commission for a Unified Comprehensive Sign Plan
Approval. The Plan proposes the placement and installation of five (5) wall signs totaling 123
square feet around the building. The property is zoned C-4 (Highway Commercial Zone). The
property is located on the north side of Holiday Boulevard, west of North DuPont Highway (U.S.
Route13) south of Scarborough Road (State Route 1). The owner of record is K W North, LLC.
The property address is 1788 North DuPont Highway. Tax Parcel: ED-05-057.01-02-02.00-000.
The proposed McDonald’s will coincide with the existing Holiday Inn Express and the Sleep Inn
that are currently operating on the same parcel. The project area qualifies for the Unified
Comprehensive Sign Plan because the site has three or more principle structures under common
management (Article 5 §4.8A2).
Previous Submittals
The site originally came before the Planning Commission for a Comprehensive Unified Sign
Plan in 2000. At that time the Planning Commission approved signage for the Holiday Inn
Express. The existing McDonald’s signs were installed prior to the Comprehensive Unified Sign
Plan. They also determined that the signage for the third building should come back to the
Planning Commission for approval for any signage. (US-00-03)
SIGNAGE REGULATIONS
The Zoning Ordinance permits a property on an urban principal arterial three (3) signs: one
pylon sign, one monument sign and one wall sign. For a property on an urban local collector two
(2) signs are allowed: one wall sign and one monument sign. The following table illustrates the
size and types of signs permitted under the Zoning Ordinance:
Road Max Max Setback Exclusion
Use Sign Type # Permitted % of Wall
Type Size Height (R.O.W.) Zone
Non- Urban Wall Sign 1/frontage No max 30 ft. Less than N/A N/A
Residential Principal 15 %
uses in Arterial Monument 1/entrance 63 SF 10 ft. N/A 10 ft. 50ft.
non- or post and
Page 90
US-11-02 McDonald’s
DAC Report – August 4, 2011
Page 2
Residential panel #or
districts
Pylon Sign 1/frontage 75 SF 30 ft. N/A 15 ft. 150ft.
Or*
Pylon Sign* 1/frontage 100 SF 30 ft. N/A 31 ft. 150ft.
Use Road Sign Type # Permitted Max Max % of Wall Setback Exclusion
Type Size Height (R.O.W.) Zone
Non- Urban Wall Sign 1/frontage 32 SF 30 ft. Less than N/A N/A
Residential Local 15 %
uses in Collector Monument 1/entrance 32 SF 7 ft. N/A 10 ft. 50ft.
non- or post and
Residential panel # Or
districts Post 1/frontage 8 SF 7 ft. N/A 10 ft. 25 ft.
Under the Uniform Campuses and Complexes section of the Sign Regulations (Article 5 §4.8),
an applicant may request the Planning Commission to grant additional signage and sign area;
however, “the number type and size of sign proposed may not be excessive and must be in
proportion to the scale of the building and the uses on the site.” For the Unified Comprehensive
Signage Plans, there shall be architectural harmony and unity of signs within a united campus or
complex. Sign type, color scheme, size, and illumination within the site shall be coordinated and
shall be compatible with the architecture of the center and the surrounding area. All
Comprehensive Signage Plans must comply with all design guidelines found in Article 5 §4.4 of
Design Requirements the ordinance, which focus on freestanding signs, material and
craftsmanship of sign, wall sign placement, illumination, changeable copy signs and sign
lettering size as well as all specific guidelines found in this section.
DESIGN GUIDELINES AND OBJECTIVES FOR COMPREHENSIVE SIGNAGE PLANS
In reviewing the overall sign package, each of the sign locations must be reviewed individually
and as a whole. The Planning Commission must take into consideration the public health, safety
and welfare, the comfort and convenience of the public in general and of the residents, business
and property owners of the immediate neighborhood in particular and shall ensure that the
Unified Campus/Complex has adequate, but not excessive signage.
The Sign Ordinance specifically spells out the guidelines for the Planning Commission to use to
approve or disapprove a Unified Comprehensive Signage Plan (Zoning Ordinance Article 5 § 4.8
B and C). The pertinent design guidelines and objectives are as follows:
B. Design guidelines for comprehensive signage plans.
1. Unified campuses and complexes applying for a comprehensive signage plan may not
be held to the height, size, number and area regulations for signs found in other
[sub]sections of this ordinance [section]. However, the number, type and size of signs
proposed may not be excessive, and must be in proportion to the scale of the buildings
and the uses on the site.
2. All comprehensive signage plans must comply with all design guidelines found in
subsection 4.4—Design requirements of this section, as well as all specific design
guidelines found in this section.
3. Building signs shall be in harmony with the overall architectural concept for the site,
and be compatible with each other and the building facades.
4. The freestanding signs identifying shopping centers and other unified campuses and
complexes shall identify the name of the campus or complex and no more than three
Page 91
US-11-02 McDonald’s
DAC Report – August 4, 2011
Page 3
separate tenants within the campus or complex unless otherwise approved by the
planning commission.
5. There shall be architectural harmony and unity of signs within a united campus or
complex. Sign type, color scheme, size, and illumination within the site shall be
coordinated and shall be compatible with the architecture of the center and the
surrounding area.
C. Planning commission duties. In reviewing and approving comprehensive signage plans, the
planning commission shall take into consideration the public health, safety and welfare, the
comfort and convenience of the public in general and of the residents, businesses, and property
owners of the immediate neighborhood in particular, and shall ensure that unified campuses and
complexes have adequate, but not excessive, signage. Specifically, the following objectives shall
guide the commission when reviewing such plans:
1.That the size and complexity of the campus or complex warrants the need for extra
signage under the provisions of this ordinance [section]
2.That, in respect to the number and type of entrances, the placement of signage at or
near those entrances provides superior visibility in order to ensure the safety of the
driving public;
3.That the proposed signs are adequate in number to safely direct the public to the use or
uses on the site;
4.The proposed signs must not have an adverse impact on the visibility of adjacent signs,
and shall be consistent with, or an improvement over, the prevailing type and style of
signage in the general area;
5.That the proposed signs will be of a style and color which will complement the
architecture of the site, and the area in general.
SUMMARY OF PROPOSED SIGNS
The following tables represent a listing of all signs proposed on the McDonald’s.
Exterior Signage (Placed on the building elevations)
Type Location Existing/New Text Height Quantity S.F. Total
Per sign S.F.
Wall On the sides New McDonald’s Unknown 2 40.5 SF 81 SF
of the under 30’
building. maximum
Wall On the sides New McDonald’s Unknown 3 14 SF 42 SF
of the logo Under 30’
building maximum
Directional Near Existing Welcome Unknown 3 Unknown unknown
entrances Exit/Enter
Pylon Northeast Existing McDonald’s 29’7” 1 96 SF 96 SF
corner of site logo with
changeable
copy
Total 9 219 SF
SUMMARY OF SIGNAGE AND RECOMMENDATIONS
SIGNAGE
The applicant is requesting five (5) wall signs. The signs reflect the name and logo for the
Page 92
US-11-02 McDonald’s
DAC Report – August 4, 2011
Page 4
restaurant. The five (5) wall signs will be located on three sides of the building. The height of
the sign is not indicated; however, the height of the signs will not exceed 30’ as the building is
less than 30’ in height. The percent of the wall area the signs occupy and the percent of the
mountable wall area the signs occupy have not been provided; however, staff has no concern
with the signs exceeding the percentages as the signs are small and scattered around the building.
There are four existing signs that are to remain. These include the pylon sign and the three (3)
directional signs. These signs were previously approved under the original Unified
Comprehensive Sign Plan in 2000.
Staff Recommendation for McDonald’s Wall signs
Staff recommends approval of the five (5) wall signs. Staff notes that the
Planning Commission shall note in their motion that the signs may
exceeds the mountable wall area and wall area percentages.
Staff Recommendation for Existing Signs
Staff recommends reaffirmation of the existing directional and pylon
signs. Staff notes that the pylon sign exceeds the sign area permitted
under the existing Sign Regulations; however, the sign was approved
under different Sign Regulations. These signs were also previously
approved as part of the original Unified Comprehensive Sign Plan in 2000.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) This request includes all directional and any other types of signage proposed for the site.
2) Clarify the overall height of the existing pylon sign. The data columns state the sign is 34’;
however, the note on the plan states the sign is 29’7”.
3) Indicate the sign area and height of the directional signs.
4) Provide over all dimensions of the pylon sign including the changeable copy portion of the
sign.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
None
ADVISORY COMMENTS TO THE APPLICANT:
1) In the event, that major changes and revisions to the Signage Plan occur in the
finalization of the sign plan contact the Department of Planning and Inspections.
Examples include reorientation of signage, relocation of signs, changes in sign area, etc.
Page 93
US-11-02 McDonald’s
DAC Report – August 4, 2011
Page 5
These changes may require resubmittal for review by the Development Advisory
Committee, Planning Commission, or other agencies and commissions making
recommendations in regards to the plan.
2) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
3) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections and permits are required.
4) Construction may have an effect on the adjacent property owners and nearby travel lanes.
Any work requiring the closing or rerouting of potential customers or visitors to adjacent
properties should be coordinated as to offer the least amount of inconvenience to the
adjacent property owners.
5) Staff requires a final submittal of the Unified Comprehensive Sign Plan, including any
revisions and conditions of Planning Commission approval, to be reviewed
administratively before applications for Sign Permits will be accepted.
6) The applicant shall be aware that Unified Comprehensive Sign Plan approval does not
represent a Sign Permit. Any proposed site or building identification sign shall require a
Sign Permit from the City of Dover prior to placement of any such sign.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 94
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: July 28, 2011 T
===============================================================
APPLICATION: McDonald’s USA, LLC: Comprehensive Signage Plan
FILE#: S-11-02 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. The Department has no comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
Ensure that the proposed and exist signs are not located within the right-of-way, and are
not impeding sight distance.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 95
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JULY 28, 2011
APPLICATION: MCDONALD’S USA, LLC: COMPREHENSIVE
SIGNAGE PLAN
FILE #: US-11-02
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Signs should be placed in a manner that meets NESC requirements.
WATER / WASTEWATER
1. As only wall signs are proposed the Water / Wastewater Utilities have no objection to the proposed signs. Should this
change additional review will be required.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT
P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 96
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF August 4, 2011
PLANNING COMMISSION MEETING OF August 15, 2011
Plan Title: Lands of DDP at 120 South Governors Avenue
S-11-11
Plan Type: Site Development Master Plan
Architectural Review Certification (HI-11-04)
Minor Subdivision
Property Location: West side of South Governors Avenue and north of West Loockerman
Street
Property Address: 120 South Governors Avenue
Tax Parcel: ED-05-077.09-01-44.00-000
Owner: Downtown Dover Partnership
Present Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
Existing Use: Commercial Building – Auto Parts Store and Day Care Center
Proposed Use: Mixed Use Building #1
11,874 S.F. retail
27 apartments
Apartment Building #2
24 apartments
Site Area: 76,896 S.F. +/- (1.7653 ac.)
Building Area: Existing – 16,783 S.F. (building to be demolished)
Proposed – 81,938 S.F. (total for both buildings)
Building #1 – 47,042 SF
Building #2 – 34,896 SF
Impervious Areas: Proposed – 85.6%
Waiver Requested: Side yard setbacks (as associated with Architectural Review
Certification)
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 97
C P
I L
T A
CITY OF DOVER Y N
N
DEVELOPMENT ADVISORY COMMITTEE O I
F N
APPLICATION REVIEW COMMENTARY G
D
D.A.C. MEETING DATE: August 4, 2011 O
V
E
APPLICATION: Lands of DDP at 120 South Governors Avenue R
FILE #: S-11-11 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Janelle M. Cornwell, AICP PHONE #: (302) 736-7196
PLAN SUMMARY:
This application is for a Site Development Master Plan, Minor Subdivision, and Architectural
Review Certificate for the construction of a four story 47,042 SF mixed-use building consisting
of a retail component and 27 apartments, a four story 34,896 SF apartment building with 24
apartments and ground level parking in the building, and a minor subdivision to create two lots
from the existing parcel located at 120 South Governors Avenue. The existing 16,783 SF
commercial building on the property is proposed for demolition. The property consists of 1.7653
acres ± and is zoned C-2 (Central Commercial Zone) and subject to the H (Historic District
Zone). The property site spans the block between South Governors Avenue and South New
Street located north of, but not adjacent to, West Loockerman Street. The owner of record is
Downtown Dover Partnership (formerly the Downtown Dover Development Corporation).
Property Address: 120 South Governors Avenue. Tax Parcel: ED05-077.09-01-44.00-000.
This project requires Site Development Master Plan Review, Architectural Review Certification
and a Minor Subdivision.
PROJECT PROPOSAL:
This proposal involves the construction of a two (2) buildings at 120 South Governors Avenue.
The first new building is a four story mixed use building located off of South Governors Avenue.
This building provides 11,874 SF of retail space on the first floor and 27 apartments on floors 2-
4. The second building located off of South New Street is a four story apartment building with
24 apartments on floors 2-4 and parking on the first floor.
HISTORIC DISTRICT COMMISSION - RECOMMENDATION
For the Lands of DDP at 120 South Governors Avenue project, the Historic District Commission
considered the application HI-11-04 on July 21, 2011 regarding an Architectural Review
Certificate for the construction of new building and other associated site improvements. The
Historic District Commission has made recommendation on the Architectural Review
Certificate. See the attached Architectural Review Recommendation Report from the
Historic District Commission.
Page 98
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 2 of 11
The Planning Commission must act upon the Architectural Review Certification as part of any
motion regarding this project, or as a separate motion if necessary. In taking this action, the
Planning Commission is to consider the Design Standards and Guidelines for the City of Dover
Historic District Zone for New Construction found in Chapter 4 of the guidelines.
Bulk Standard Waiver to be requested:
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, floor area
ratio, height, number of stories, etc. This proposal for the building does not conform to a side
yard setback requirement of the C-2 Zoning District and requires a waiver as a part of the
Architectural Review Certificate. The City of Dover Zoning Ordinance authorizes the Historic
District Commission to waive certain bulk standards when issuing its recommendation to the
Planning Commission for an Architectural Review Certificate. A written waiver request for the
encroachment into the side yard setback for the Governors Avenue mixed use building has just
been submitted to the Planning Office for consideration.
The waiver was not reviewed by the Historic District Commission for the project at their July
meeting during review of this project. The waiver request recently received will be forwarded to
the Historic District Commission for their review and recommendation. The next meeting of the
Historic District Commission is scheduled for August 18, 2011.
Waiver Bulk Standard Ordinance As shown on the plan
Request requirements (Requested)
Side Yard setback None required, 7 foot
but 10 feet
minimum if
provided.
SITE DEVELOPMENT MASTER PLAN
The plan for this campus streetscape enhancement project is submitted for review under the Site
Development Master Plan process (See Zoning Ordinance, Article 10 §2.58 listed below (Code
in place at time of application filing)). This process allows for a series of construction phases to
be outlined in a Master Plan for Planning Commission review and approval. Prior to each Phase
of construction a Site Plan specific to that phase is submitted for Administrative Site Plan
review.
2.58 Site development master plans. Site development master plans shall depict a generalized
site development proposal that reflects general compliance with all applicable provisions of article
10, [sub] section 2.5 above, and shall also reflect the following information on the plan:
(1) [The] plan shall illustrate distinct phase boundaries for each proposed construction phase and
shall detail proposed construction and site improvements planned for each phase. Bulk
quantities and area totals for each construction phase, and for the total site, shall be
tabulated in a data column on the plan.
(2) Each construction phase shall be enumerated in sequential order on the site development
master plan according to the order of construction contemplated by the plan. Phases shall be
implemented in accordance with the approved site development master plan.
(3) Each construction phase represented on the master plan shall be planned and designed to
function independent of construction and site improvements contemplated in future
Page 99
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 3 of 11
construction phases in all respects, including but not limited to bulk area provisions of the
zoning district in which the site is located, off-street parking requirements, site entrances,
emergency access requirements, site utilities, and stormwater management improvements.
(4) Any special agreements or conditions of approval relative to the overall development that
have been specified by regulatory agencies shall be documented on the site development
master plan.
Site construction plans, details, and specifications are not required as part of a site development
master plan submission. Final site construction plans, including detailed site grading, paving,
utilities, stormwater management, and tree planting and preservation plans shall be submitted for
final approval by the planning director, and/or authorized designee, and to other agencies having
jurisdiction, on a phase by phase basis in accordance with the approved site development master
plan, and all regulations of the City of Dover governing the approval of site plans as set forth in
[this] article 10, section 2 of this ordinance.
PHASING
The Site Development Master Plan proposes three (3) phases for the development of the site.
Phase 1 is for the construction of Building #1 located off of South Governors Avenue. This
phase includes the mixed use building and an Active Recreation Area for the apartments. The
phase does not address parking and what will be constructed regarding site improvements. Phase
2 is for the demolition of the existing commercial building. The final phase, Phase 3, is for the
construction of Building #2 adjacent to South New Street and an Active Recreation Area. The
site improvements and overall parking strategy is not identified as part of the Phasing Plan. The
Phasing Plan does not meet the requirements as stated in the Zoning Ordinance, Article 10
Section 2.58.
Subdivision
The application includes a minor subdivision to create two lots from the existing 1.7653 ac. +/-
parcel. The two new parcels will be 0.7725 acre+/- and 0.9928 acre+/-. The parcels will need to
comply with the Bulk Standards for the C-2 Zoning District. The Bulk Standards for the C-2
Zoning District are as follows:
MINIMUM REQUIRED: C-2 (CENTRAL
COMMERCIAL ZONE)
Lot Area
Lot Configuration- Width (ft.) 0
Depth (ft.) 70 ft.
Front yard setback (ft.) 0
Side yard setback (ft.) None required, but 10
ft. minimum if
provided.
Rear yard setback (ft.) 20 ft. above ground
floor. At ground floor,
5 ft. required.
Off-Street Parking Spaces : 0.5 for new
Per 300 SF of floor area construction
Apartments 1 per dwelling unit
Maximum Permitted :
Building Height: Stories 6 stories
Feet 60 feet
Floor Area Ratio 4.0
Page 100
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 4 of 11
PARKING SUMMARY
In the C-2 (Central Commercial Zone) there is 0.5 off street parking requirement per 300 SF of
floor area for new construction. The C-2 Zone requires one parking space for each apartment
unit created. The plan proposes 51 apartment units. This requires 51 off-street parking spaces.
Based on the square footage of the new commercial area at 11,874 S.F., twenty (20) parking
spaces are required. A total of 71 parking spaces are required for the project. The plan indicates
85 spaces on the plan including four (4) handicap parking spaces. The plan exceeds the parking
requirement without exceeding the maximum number of parking spaces permitted.
Bicycle Parking
The site is required to provide bicycle parking. The bicycle parking calculation is one for every
twenty parking spaces. Based on the number of required parking spaces five (5) bicycle parking
spaces are required. The bicycle parking is located near the proposed buildings.
SITE CONSIDERATIONS
Entrance
The site has two points of ingress and egress. The entrance for the mixed use building is located
off of South Governors Avenue. The entrance for the apartment building is located off of South
New Street. South Governors Avenue is a State maintained road and South New Street is a city
maintained road. The two entrance points from the public streets lead to a surface parking lot
internal to the site serving both buildings, and also provide access to the ground level parking in
Building #2.
Dumpsters
Dumpsters for trash collection are required for the development of the site. Based on the amount
of retail space in the proposed mixed use building, two (2) dumpster pads locations are required.
Based on the number of apartment units to be located within the proposed mixed use building,
three (3) dumpster pads are required. A total of five (5) dumpster pads are required for the
project site. The plan provides only one (1) dumpster pad location. The minimum dimensions
for a dumpster pad is 12 feet deep and 12 feet wide. The dumpster pad and enclosure is located
in the parking lot. The dumpster enclosure detail shall indicate that the proposed materials will
match the proposed materials of the building. The method of trash collection will be private.
The applicant needs to indicate locations for the other dumpsters on the site. A reduction in the
number of provided dumpster locations may be considered; however, one dumpster location is
not sufficient for the number of apartments and retail space on the site. The applicant needs to
reserve area for dumpster pads not constructed on the site and will be required to be constructed
in the future if determined to be necessary by the Planning Director. (Article 5, Section 6.18)
Sidewalks
The site has existing sidewalks along the street frontage of South Governors Avenue and South
New Street. The plan does not provide for handicapped accessible ramps at the points of
intersection of the entrances/exits. The plan identifies several locations along the street frontages
where the sidewalk will be disturbed during construction. The applicant will be required to
reconstruct the sidewalk and curb where site improvements/entrance changes are proposed. The
applicant is proposing to use brick sidewalk along South Governors Avenue and concrete along
Page 101
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 5 of 11
South New Street. Ensure that the sidewalk is accessible for the apartment building entrance on
South New Street.
Lighting
Lighting is provided on the plan. A detail identifying the type of lighting that will be used needs
to be on the plan. Lighting should also be provided in the covered parking areas of the site.
Lighting located along the street shall be consistent with the existing fixtures used in the
downtown area.
RECREATION/ OPEN SPACE:
Active Recreation Area for this project is required at a rate of 75 square feet per dwelling unit
with a minimum of 2,500 SF provided on site. (Zoning Ordinance, Article 5 §10.515) Based on
51 dwelling units, 3,825 S.F. of active recreation area is required. The Plan indicates that 5,210
S.F. +/- of land will be reserved as active recreation space. The Active Recreation Areas are in
central locations on the site. The proposed amenities include a garden area with a walking path
and benches behind the South Governors Avenue building and a gazebo with picnic tables next
to the South New Street building. The gazebo will be removed as it is considered a structure and
does not meet the setback requirements for a structure from an adjacent residential use.
South Governors Avenue (Building #1)
The garden area with a brick walking path, benches and grass area is 2,052 SF. The area is
accessible from the back of the mixed use building and is landscaped. There are five (5) benches
proposed within this area.
South New Street (Building #2)
The area with picnic tables and grass area is 3,158 SF. The area is accessible from the side and
rear of the residential building. The landscaped area includes four (4) picnic tables surrounding
the gazebo.
The Tree Preservation and Planting Plan and Active Recreation Plans and Details sheet (sheets
L-101 and L-102) illustrate how the site will provide recreation amenities to comply with the
design specifications described in Article 5 §10 of the Zoning Ordinance.
For the Lands of DDP at 120 South Governors Avenue project, the Park, Recreation and
Community Enhancement Committee considered the Active Recreation Plan (part of S-11-11)
on July 11, 2011. The Parks, Recreation and Community Enhancement Committee
recommended approval of the active recreation area plan as presented and with staff
comments.
The Planning Commission must act upon the Active Recreation Plan as part of any motion
regarding this project, or as a separate motion if necessary. A copy of the Parks, Recreation and
Community Enhancement Committee Active Recreation Report is attached.
BUILDING ARCHITECTURE:
Governors Avenue Building (Building #1)
This is a four story masonry building. The exterior materials include brick, stucco and Hardie-
Page 102
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 6 of 11
board. Windows are located throughout the building and balconies are provided along sections
of the building providing relief on floors 2-4. The first floor is the commercial portion of the
building. This area has glass storefront windows and entry ways into the tenant spaces.
Awnings are proposed over the retail spaces. The residential portion of the building (floors 2-4)
is a mixture of several brick colors, stucco and Hardie-board.
South New Street (Building #2)
This is a four story building (not three story as labeled on the plan drawings). The first floor or
ground level is a parking garage of twenty-three spaces. Then there are three floors of apartment
units. The first floor utilizes brick as an exterior finish while floors 2-4 utilize brick and several
colors of Hardie-board. Balconies are provided on the upper floors. The building has a pitched
asphalt shingle roof with four standing seam metal gable roof elements located at the eaveline.
A detailed description of the architecture of the buildings is in the Historic District Commission
report that is attached.
TREE PLANTING AND LANDSCAPE PLAN
The submitted plan includes the Landscaping details. Based on the 76,896 S.F. property, a total
of twenty six (26) trees are required. The plan proposes the planting of thirty-three (33) new
trees to meet the requirement. The proposed trees will be located throughout the site. The
proposed trees are a mixture of deciduous trees. The mixture includes River Birch, Willow Oak,
Red Maple, and Winterking Hawthorn, and Crepe Myrtle. There are existing street trees along
both South Governors Avenue and South New Street.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) The Setback shall be complied with in accordance to the Zoning Ordinance unless a waiver
for the encroachment of the building into the side yard setback is granted by the Planning
Commission upon recommendation of the Historic District Commission. A written waiver
request for the encroachment into the side yard setback has been submitted to the Planning
Office for consideration. This waiver request will also be considered by the Historic District
Commission at their August 18, 2011 meeting.
2) Revise the Phasing Plan to address how each phase will function independently (and
cumulatively) with regards to stormwater management, parking, and site improvements.
3) Revise the following items on the Minor Subdivision Plan Sheet:
a) Revise item #4 in the Site Data Column to indicate that the property is also zoned H
(Historic District Overlay Zone).
b) Clarify the acreage of lot 2. The site data column indicates the size of the lot as 0.7725;
however, the plan indicates the size is 0.7724.
c) Indicate the square footage on the plan.
Page 103
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 7 of 11
d) Provide the dimensions of the parcels on the plan.
e) Provide a cross access agreement between the two parcels for shared parking, entrances,
etc.
f) Indicate any utility easements.
g) Ensure the proposed buildings do not conflict with the placement of the proposed
property lines (i.e. setback issues).
h) Ensure the existing building does not cross a property line.
i) Ensure the placement of the property lines does not create any non-conforming issues
with the site.
4) The data column needs to be updated prior to Final Approval. Some of the items which need
revising are as follows:
a) Clarify the number of bicycle parking spaces provided. The required number is five
(5) however, the number shown is greater.
b) Indicate the zoning H (Historic District Zone) under the zoning for the site.
c) Indicate that trash collection will utilize a private hauler.
d) Add a note to the Plan to provide information on any waivers granted by the Planning
Commission.
e) Add a note to the plan stating that the Historic District Commission reviewed the
application at its July 21, 2011 meeting.
f) Any changes recommended by the Planning Commission.
g) Confirm the height of the buildings.
h) Indicate the decision of the Planning Commission on any waivers granted.
5) Indicate any existing or proposed easements related to utilities, stormwater, etc.
6) Governors Avenue is a State maintained road; therefore, work within the right-of-way is
subject to DelDOT requirements.
7) South New Street is a City maintained road; therefore, work within the right-of-way is
subject to City of Dover Department of Public Services requirements.
8) Provide additional dumpster pad locations on the site.
9) Reserve area for the remaining dumpster pad locations on the site.
10) Provide a note stating that the reserved dumpster pad and enclosure shall be constructed if
determined to be necessary by the Planning Director.
11) Provide a separate lighting plan sheet.
12) Provide a separate sign and striping plan sheet.
13) Provide crosswalks across the entrances and exits on the site.
14) Ensure the sidewalks at the intersection of the site entrances/exits are accessible.
Page 104
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 8 of 11
15) Provide an accessible access at the rear of Building #2 into the parking garage and/or the
active recreation area.
16) Revise the number of stories of Building #2 from 3 to 4 stories on all Plan Sheets.
17) Provide construction details for the following but not limited to: sidewalk ensuring
accessibility, curbing, dumpster enclosure ensuring architecture matches the building
materials, paving, lighting, bicycle rack, awning height, etc.
18) Provide the following information on the Tree Preservation and Planting Plan:
a) Ensure that tree planting locations do not conflict with existing or proposed utilities.
b) Remove the gazebo.
c) Eliminate two picnic tables and two benches.
d) Indicate in the Site Data Column that the site is also subject to H (Historic District Zone).
19) The following items should be included on the Active Recreation Plans and Details Plan to
clarify the construction of the recreation area improvements:
a) Provide a list of the proposed features on the Active Recreation Plan (i.e. the number of
benches and the details of the items).
b) Remove the gazebo from the plan.
c) Revise the bench detail to have a divided bench.
d) Revise the fence to be an open fence as shown on the Architectural Elevations and
compliance with Architectural Review Certification.
e) Provide a construction detail for the open fence as shown on the Architectural Elevations.
Staff notes that the maximum height is 4 feet.
f) Ensure one picnic table is accessible.
g) Clarify the use of two picnic table details.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) The Historic District Commission at their meeting of 7/21/11 took action to provide a
Recommendation regarding the Architectural Review Certification for the project
including a series of comments. These recommendations address the demolition of the
existing building, construction of the two new buildings and the associated site
improvements. These comments/recommendations may be adopted by reference to the
Architectural Review Recommendation Report when taking action on the Architectural
Review Certification.
2) Planning Staff as part of the review prepared a series of review comments in regards to
the Architectural Review Certification and ways to improve compliance with the Design
Standards and Guidelines. A number of these comments were adopted by the Historic
District Commission and/or clarified in the Site Plan submission.
3) Staff recommends that any outside HVAC Equipment be designed to minimize the
impact on adjacent property owners, adequately screened from public view and the
overall visible impact on the streetscape. The location should be depicted on the plan.
Page 105
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 9 of 11
4) Staff recommends the site provide the ability for recycling. This could include a separate
dumpster pad and enclosure for recycling only.
5) With the building design, the height of the finished floor elevation in relation to the
sidewalk and parking lot must be considered in order to achieve accessibility into the
building. If additional building elements are required to achieve accessibility, they may
require further review by the Historic District Commission.
6) Staff encourages the project to identify areas where the sidewalks or portions of the
sidewalks will be constructed of brick or a grass landscape strip will be implemented.
The use of brick paving materials for sidewalk construction is a key feature found
throughout the Historic District area.
a. The grass strip should be implemented in the areas of South New Street were the
existing curb cut will be removed.
b. The City’s standards for sidewalk format must be met.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission must act upon the Architectural Review Certification as part of
any motion to approve this project, or as a separate motion if necessary.
2) The Planning Commission must act upon the Active Recreation Area Plan as part of any
motion to approve this project, or as a separate motion if necessary.
3) The Planning Commission will act upon waiver requests as part of any motion to approve
this project, or as a separate motion if necessary. Note: All waivers are at the discretion of
the Planning Commission; however, certain waivers are considered upon recommendation of
the Historic District Commission. The Commission may approve or deny waiver requests.
4) The applicant is reminded of the requirements for construction phasing of the recreation area
as associated with the development of the residential units.
Article 5 §10.6 Construction Phasing. The recreation and open space areas shall be
completed in a proportion equal to or greater than the proportion of residential dwelling
units completed, except that one hundred (100) percent of the recreation and open space
areas shall be completed prior to issuing building permits for the final twenty (20) percent
of the dwelling units proposed. Building permits shall not be issued for dwelling units
unless the requirements of this section are met.
5) There shall be provisions which insure that the common open space land shall continue as
such and be properly managed and maintained. The developer shall either retain ownership
and responsibility for maintenance of such open land; or provide for and establish one (1) or
more organizations for the ownership and maintenance of all common open space i.e. a
Homeowners Association. The organization shall be responsible for maintenance, insurance
and taxes on the common open space.
6) Other agencies and departments which participate in the Development Advisory Committee
Page 106
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 10 of 11
may provide additional comments related to their areas of expertise and code requirements.
7) Following Planning Commission approval of the Site Development Master Plan, the Record
Plan must be revised to meet all conditions of approval from the Development Advisory
Committee or as otherwise noted. A Check Print must be submitted for review by Planning
Office Staff. Upon determination that the Plan is complete and all agency approvals have
been received, copies of the Plan may be submitted for final endorsement prior to
recordation.
8) In the event, that major changes and revisions to the Site Development Master Plan or
Building Architecture and materials occur in the finalization of the Site Plan contact the
Department of Planning and Inspections. These changes may require resubmittal for review
by the Development Advisory Committee, Historic District Commission, Planning
Commission, or other commissions making recommendations in regards to the plan.
9) To progress to construction, the submission of a Site Plan of the construction phase project
area must be submitted for Administrative Site Plan Review by the Planning Office and other
agencies. Article 10 §2.491b (as in Code at time of application filing) sets forth the
construction timing in relation to approvals.
Article 10 §2.491
(b) For projects which are reviewed and approved by the planning commission as site
development master plans, approval of the master plan shall remain valid for a period not to
exceed five years from the date of planning commission approval, provided that the authorized
construction or use has commenced within one year of approval and is proceeding toward
completion, unless an extension of time is applied for by the applicant and granted by the
planning commission. In addition, the time between the completion of one phase and the initiation
of the next phase shall not exceed a period of two years. Upon approval of a site development
master plan by the planning commission, the planning director or authorized designee shall have
approval authority over final plans governing each phase of construction as depicted on the
master plan
10) Construction and demolition will have an effect on the adjacent property owners and nearby
streets. Any work requiring the closing or rerouting of potential customers or visitors to the
adjacent properties and streets shall be coordinated with the Planning Office and other City
Staff as to offer the least amount of inconvenience. This shall include a street
closure/construction activity plan addressing site protection, fencing, etc.
11) The applicant shall be aware that Demolition Permits for the building is required to precede
with any demolition activities on the property. The permit application must comply with the
approvals and conditions granted through the Architectural Review Certification process.
12) For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector and Office of the Fire Marshal for
these requirements. The resolution of these items can impact the site design or building
exterior finishes or design in some instances.
13) The applicant/developer shall be aware that prior to any ground disturbing activities on the
site the appropriate site inspections and permits are required.
Page 107
S-11-11 Lands of DDP at 120 S. Governors Ave.
DAC Report for August 4, 2011
Page 11 of 11
14) The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on these properties. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing with
archaeological resources including previous studies at the subject location.
15) The applicant shall be aware that Site Development Master Plan approval does not represent
a Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Building Permit from the City of Dover. The Building
Permit submission must comply with the conditions of approval of the Architectural Review
Certification.
16) The applicant shall be aware that Site Development Master Plan approval does not represent
a Sign Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the City of
Dover prior to placement of any such sign.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 108
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JULY 28, 2011
APPLICATION: LANDS OF DOWNTOWN DOVER PARTNERSHIP:
120 S. GOVERNORS AVENUE
FILE #: S-11-11
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department.
Developer may be required to perform a quantity of the relocation. Any work performed by the City of Dover
will be at the owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 109
Lands of Downtown Dover Partnership
File #: S-11-11
July 28, 2011
Page 2 of 4
WATER
1. The following notes must be added to the plans:
a. All water utility components must meet the requirements of the Public Utilities Water Wastewater Handbook,
effective date March 22, 2010.
b. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
c. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Public Utilities Department specifications and requirements.
d. The site contractor shall contact the City of Dover Public Utilities Construction Manager at (302) 736-7070 prior to
the start of construction. A representative from the City of Dover Department of Public Utilities must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
2. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
3. The plan currently shows the site’s proposed eight-inch (8”) water line on the site connecting to the existing four-inch
(4”) water main in New Street and existing four-inch (4”) water main in South Governors Avenue. This does not meet
fire suppression requirements for multi-story building. Pressure adequacy for these structures is of particular concern.
In order to meet these requirements the plans must be revised in one of the following manners:
a. The eight-inch (8”) water main located on the west side of South Governors Avenue (currently depicted as a
twelve-inch (12”)) must be extended by the applicant, at their expense, to the northern property line to allow for a
satisfactory connection onto the site.
b. The site must be reconfigured to allow for the site’s proposed eight-inch (8”) water line to connect to the existing
eight-inch (8”) water main at its current location.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must
be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must
be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is
required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the
building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap
and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is
recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The
Public Utilities Department will test and inspect all fire mains to a blind flange located inside the buildings. The blind
flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must
be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall
be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor
to the ninety degree (90 ) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls
and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
Page 110
Lands of Downtown Dover Partnership
File #: S-11-11
July 28, 2011
Page 3 of 4
WASTEWATER
1. The following notes must be added to the plans:
a. All wastewater utility components must meet the requirements of the Public Utilities Water Wastewater Handbook,
effective date March 22, 2010. Please contact our office for more information
b. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Public Utilities Department specifications and requirements.
c. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures.
3. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
4. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease interceptor, meeting all Kent County
ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the
proposed location, must be provided on the plan.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
GENERAL
1. The following note must be added to the plans: All existing utilities shall be adjusted to final grade in accordance with
current City of Dover requirements and practices. This must be included as a note on the plan.
2. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. There are existing lines that must be relocated and there is one buried electric line through the middle of the parcel
that was not captured on the plans.
Page 111
Lands of Downtown Dover Partnership
File #: S-11-11
July 28, 2011
Page 4 of 4
WATER
1. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Public Utilities
Department directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking
Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan
sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the
Office of Drinking Water until review has been completed by our office.
WASTEWATER
1. Prior to plan approval, the sanitary sewer system plans must be submitted to the DNREC, Division of Water
Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for
providing all application fees, completed forms and plan sets directly to DNREC.
STORMWATER
1. None.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 112
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: D S
O H
V A
E L
R
APPLICATION: Lands of Downtown Partnership 120 S Governors Av
FILE #: S-11-11 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
Fire Lanes are ok as shown.
Any gas fired HVAC equipment must be equipped with emergency cut off switches remotely
located.
Address numbers of at least 12 inches in height must be placed on the street side of the building
visible from the street.
Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection.
Full building and fire plan review is required.
Building cannot be occupied or construction or renovations started until completion of building
and fire plan review.
Sprinkler system required. System to be monitored.
Fire Department connection to be located within 50 feet of main entrance.
Fire Department connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
Page 113
Fire alarm system required.
Knox Box required.
Standpipes required.
Elevator cars to meet the interior dimensions set forth in the Delaware State Fire Prevention
Code.
Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
All comments from this office, approved by the Planning Commission are at the expense of the
owner/applicant.
The proposed building will be reviewed under Residential/Business/Mercantile Occupancy.
The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all other
NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan be
submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 114
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: July 28, 2011 T
===============================================================
APPLICATION: Lands of Downtown Dover Partnership at 120 S. Governors Avenue
FILE#: S-11-11 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. In order to be issued an entrance permit, the department will require the applicant to
provide the proper forms, fees, and plans.
2. ADA compliant curb ramps must be provided along the frontage of the site.
3. The proposed development will be releasing storm water into the State drainage
system. As a result, a stormwater management report (SWMR) must be provided for
review and approval prior to releasing the approval letter for the construction of the
entrance.
4. South Governors Avenue will need to be overlaid along the frontage of the site due to
all of the proposed patching along the roadway.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
A light pole is show in the landing area of proposed curb ramp on South New Street.
Please ensure that proposed curb ramp is constructed per the ADA Guidelines.
ADVISORY COMMENTS TO THE APPLICANT:
The existing parking spaces that are in the proximity of the proposed entrance on South
Governors Avenue may have to be removed in order to improve sight distance. Show a
sight distance triangle with a decision point of 18' maximum from the edge of the travel
Page 115
way in order to determine the parking space to be removed.
A Traffic Management Plan B (TMP-B) may be required for this project due to the
proposed pipe installation underneath of S. Govenors Avenue. Please contact Mr. Adam
Weiser at (302) 659-4073 or via e-mail at Adam.weiser@state.de.us to discuss the MOT
Plans for this project.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 116
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
DEVELOPER APPLICATION MEETING DATE: AUGUST 2011
APPLICATION: Lands of Downtown Dover Partnership
FILE #: S-11-11
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH
THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE
ADDRESSED BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan
must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of
plan submittal to our office. Construction inspection fees based on developed area and stormwater facility
maintenance inspection fees based on the number of stormwater facilities are due prior to the start of construction.
Please refer to the fee schedule for those amounts.
2. The following notes must appear on the record plan:
The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment
control measure, as it deems necessary.
A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
3. A soils investigation supporting the stormwater management facility design is required to determine impacts of the
seasonal high groundwater level and soils for any basin design.
ADVISORY COMMENTS TO THE APPLICANT:
1. Green Technologies (bio retention, bio swales etc.) must be considered before traditional facilities can be considered.
2. The preferred methods of stormwater management are those practices that maximize the use of the natural features
of a site, promote recharge and minimize the reliance on structural components.
3. It is recommended that the stormwater management areas be incorporated into the overall landscape plan to enhance
water quality and to make the stormwater facility an attractive community amenity.
4. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management
plan has been approved.
5. Based on the site characteristics, a pre-application meeting will be required to discuss stormwater management and
drainage for this site.
Page 117
Dover/Kent
CITY OF DOVER
County
DEVELOPMENT ADVISORY COMMITTEE Metropolitan
APPLICATION REVIEW COMMENTARY
Planning
Organization
D.A.C. MEETING DATE: 8/4/2011
APPLICATION: Lands of Downtown Dover Partnership at 120 S. Governors Ave.
FILE #: S-11-11 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Jim Galvin, AICP PHONE #: (302) 387-6030
The Dover/Kent County MPO requested the opportunity to bring the recommendations on issues of our
concern to the City. The MPO limits comments to development proposals and applications that may lead to
new development. Issues of concern to the MPO are effective transit, reducing the amount of vehicle
emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including
bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the
standard for all applications, not to be waived.
City of Dover Planning Commission 8/15/2011
Project Review
S-11-11 Lands of Downtown Dover Partnership at 120 S. Governors Ave.
This proposal was a portion of the Dover Transit Center Neighborhood Plan and has evolved to the submitted
plan. The Neighborhood Plan was funded by the Dover/Kent County MPO with participation of the DDP. I
participated in most sessions and in the development of the final Plan and Design Book. I also had the
opportunity to have input into the design of this site.
The South Governors Ave. location is a few parcels north of West Loockerman Street. It is in the center of the
City with all the City services available. Facilities exist for alternative modes of transportation as well as
vehicle access. The Project is within walking distance of several transit stops for several bus routes. It has
sidewalks at both road frontages and into entrance driveways on both frontages. There are site-based bicycle
facilities indicated in the plans.
There is an opportunity to serve a variety of ground floor uses on the Governors Ave side, including cafes,
restaurants and small shops. In an effort to promote the concept of ‘Complete Streets’, the sidewalk has been
proposed to be a substantial width along the building front. The MPO feels the tenants should have the
opportunity to use sidewalk space for exterior facilities, including tables and chairs.
The site meets the standards the MPO considers important. We have no objections to the plan.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 119
City of Dover
DATA SHEET FOR RECREATION PLAN REVIEW
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF July 11, 2011
Planning Commission Meeting of August 15, 2011
Plan Title: Lands of Downtown Dover Partnership at 120 S. Governors Avenue
Plan Type: Site Development Master Plan: Active Recreation Area Plan
Location: West side of College Road north of Loockerman Street
Tax Parcel Number: ED-05-077.09-01-44.00-000
Owner: Downtown Dover Development Corp.
Site Area: 1.73 Acres +/-
Proposed Use: Mixed Use Development
1 Residential Building - 24 residential apartments
1 Mixed Use Building- 27 residential apartments
11,874 SF retail on first floor
Zoning: C-2 (Central Commercial Zone)
H (Historic District Overlay Zone)
Project Summary
The lands of Downtown Dover Partnership at 120 South Governors Avenue will be reviewed as
a Site Development Master Plan. The subject property consists of one parcel of land totaling
1.7653 acres +/-. The Site Development Master Plan is to permit the construction of two (2)
buildings. The first building located off of South Governors Avenue is a 47,042 SF mixed use
building with 27 apartments and 11,874 SF of retail on the first floor. The second building
located off of South New Street is a 34,896 SF residential building with 24 apartments.
Active Recreation Area Plan Summary:
As part of the Site Plan review process for this project, the applicant prepared a Conceptual
Recreation Plan which illustrates how the property located at 120 South Governors Avenue will
provide recreation amenities in accordance with the design specifications described in Article 5,
Section 10 of the Zoning Ordinance. The Plan indicates that 5,210 S.F. of land would be
reserved as Active Recreation Area. The Active Recreation Areas are in central locations on the
site. The proposed amenities include a garden area with a walking path and benches behind the
South Governors Avenue building and a gazebo with picnic tables next to the South New Street
building.
South Governors Avenue
The garden area with a brick walking path, benches and grass area is 2,052 SF. The area is
accessible from the back of the mixed use building and is landscaped. There are five (5) benches
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 120
Lands of Downtown Dover Partnership at 120 S. Governors Ave.: Active Recreation Area Plan
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on July 11, 2011
Page 2 of 4
proposed within this area.
South New Street
The gazebo with picnic tables and grass area is 3,158 SF. The area is accessible from the side
and rear of the residential building. The landscaped area includes four (4) picnic tables
surrounding the gazebo.
This active recreation area plan must be reviewed by the Parks, Recreation, and Community
Enhancement Committee for a recommendation prior to consideration of the Site Development
Master Plan by Planning Commission.
The following table provides information from the submitted Plan (dated 6/17/2011) for the
Active Recreation Area to be constructed:
Required Provided on Plan
Active Recreation Area 75 S.F. per dwelling unit with Gazebo and picnic tables =
(Article 5 §10.515) a minimum of 2,500 SF to be 3,158 SF
provided on site. Garden Area with walking
51 DU = 3,825 S.F. path and benches = 2,052 SF
Requires 3,825 SF
Active Recreation Amenities Accessible Located through the
(Article 5 §10.15) development.
Active Recreation Amenities Age Oriented to development The garden area with benches
(Article 5 §10.15) and the gazebo with picnic
tables would serve all ages.
Parking The particulars of the
proposed active recreation do
not have associated parking
needs.
Setbacks: 30 feet from The garden area and benches
residential lots and 25 feet are in compliance as required.
from right-of-way for street The gazebo is located within
30’ of a residential lot and is
within 25’ of the right-of-way.
Landscaping The project shows trees and
landscaping around the site
and within the various
recreation areas.
Staff Recommendations:
The following are comments and recommendations from Staff of the Planning Office following
review of the Active Recreation Area to be constructed.
1. The proposed plan meets the area requirements for the Active Recreation Area. The plan
is required to provide 3,825 SF of Active Recreation Area and it is proposing 5,210 SF of
Active Recreation Area.
2. Staff recommends approval of the walking path, 3 benches, and 2 picnic tables.
Page 121
Lands of Downtown Dover Partnership at 120 S. Governors Ave.: Active Recreation Area Plan
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on July 11, 2011
Page 3 of 4
3. The gazebo is located within 25 feet of the right-of-way and is within 30 feet of a
residentially used parcel. Upon consultation with the applicant the gazebo will be
removed from the plan.
a. The removal of the gazebo does not impact the overall square footage of the
Active Recreation Area.
4. Staff recommends the addition of paved patio/picnic with a grill area in the location of
the gazebo (to be removed).
5. Staff recommends the reduction of two picnic tables and the reduction of two benches.
6. The following items should be included on the Plan to clarify the construction of the
recreation area improvements:
a. Provide a list of the proposed features on the Active Recreation Plan (i.e. the
number of benches and the details of the items).
b. Remove the gazebo from the plan.
c. Revise the bench detail to have a divided bench.
d. Revise the fence to be an open fence as shown on the Architectural Elevations.
e. Ensure one picnic table is accessible.
7. The applicant is reminded of the requirements for construction phasing of the recreation
area as associated with the development of the residential units.
Article 5 §10.6 Construction Phasing. The recreation and open space areas shall be
completed in a proportion equal to or greater than the proportion of residential dwelling
units completed, except that one hundred (100) percent of the recreation and open space
areas shall be completed prior to issuing building permits for the final twenty (20) percent
of the dwelling units proposed. Building permits shall not be issued for dwelling units
unless the requirements of this section are met.
8. There shall be provisions which ensure that the common open space land (including
active recreation area) shall continue as such and be properly managed and maintained.
The developer shall either retain ownership and responsibility for maintenance of such
open land; or provide for and establish one (1) or more organizations for the ownership
and maintenance of all common open space i.e. a Homeowners Association. The
organization shall be responsible for maintenance, insurance and taxes on the common
open space.
a. Add a note on the Site Plan regarding who is responsible for maintenance, and
insurance on the common open space.
9. In the event, that major changes and revisions to the Site Plan occur in the finalization of
the Site Plan contact the Planning Office. Examples include reorientation of buildings,
relocation of site components like stormwater management areas, and increases in floor
area. These changes may require resubmission for review by the Development Advisory
Committee, Planning Commission, or other agencies and commissions making
recommendations in regards to the plan.
The Parks, Recreation, and Community Enhancement Committee shall submit to the Planning
Page 122
Lands of Downtown Dover Partnership at 120 S. Governors Ave.: Active Recreation Area Plan
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on July 11, 2011
Page 4 of 4
Commission a report detailing the recommendations as to the Recreation Area Plan.
Attachments: Active Recreation Plan Set dated June 17, 2011
List of Amenities
Cost Estimate of Improvements
Page 128
City of Dover
ARCHITECTURAL REVIEW REPORT
Recommendation Report of the Dover Historic District Commission
Meeting of July 21, 2011
Application: Acme Site Redevelopment Master Plan
Location: West side of South Governors Avenue over to South New Street,
north of West Loockerman Street
Tax Parcel: ED-05-077.09-01-44.00-000
Owner: Downtown Dover Partnership (previously known as Downtown
Dover Development Corporation)
Present Zoning: C-2 - Central Commercial District Zone
H - Historic District Zone
Present Use: Commercial building with a retail tenant and a day care center
tenant with a parking lot
Proposed Use: Retail/Apartment Building #1: 11,874 SF commercial/retail space
and 27 apartments
Apartment Building #2: 24 apartments with ground level parking
in building
File Number: HI-11-04
Project Description:
The Historic District Commission conducted a public hearing and took action to make a
recommendation to the City of Dover Planning Commission for an Architectural Review
Certificate for the Acme Site Redevelopment Master Plan project. This application consists of a
phased project that is to include a retail/apartment building and second apartment building with
the demolition of the existing mid-to-late twentieth century commercial building. The project
also includes the associated parking, streetscape improvements, landscaping, and stormwater
management facilities. The project area consists of one parcel of land totaling 1.7653 acres ± and
zoned C-2 (Central Commercial Zone) and subject to the H (Historic District Zone). The
property site spans the block between South Governors Avenue and South New Street located
north of, but not adjacent to, West Loockerman Street. The owner of record is the Downtown
Dover Partnership. The property address is 120 South Governors Avenue. Tax Parcel: ED-05-
077.09-01-44.00-000.
RECOMMENDATION OF THE HISTORIC DISTRICT COMMISSION:
The application was considered at the July 21, 2011 meeting of the Historic District Commission.
The following members were present: Chairman Dick Scrafford, Mr. Terry Jackson, Mr. Chaz
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 129
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 2 of 12
Salkin, and Mr. George Fisher (Commission member Mr. Joe McDaniel was recused from
participating the application review as he is a Board Member of the Downtown Dover
Partnership, the property owner). The application was represented by Mr. Gregg Moore,
President of the Downtown Dover Partnership; Mr. Bill Neaton, Executive Director of the
Downtown Dover Partnership; and Mrs. Arden Bardol, Becker Morgan Group, Inc. Public
testimony was received from Mr. Gregg Moore, President of the Downtown Dover Partnership.
Action Taken by Historic District Commission: The motion to recommend approval passed 4-0
of the members present. The Historic District Commission recommends approval of the
Architectural Review Certificate for application HI-11-04 Acme Site Redevelopment
Master Plan thus endorsing the concept of the plan presented (at the meeting) finding that
this will not be detrimental to the neighborhood on New Street and that Building #2 is
compatible with the neighborhood. And to include all other Staff comments and
recommendations with the exception of comment Item #4(c) as the Historic District
Commission finds that the massing and roof line of Building #2 has been satisfactorily
addressed by the applicant in their presentation to the Commission.
The following are the comments and recommendation for this application regarding
project activities and Architectural Review Certification as adopted by the Historic District
Commission.
1. Recommends approval of the Architectural Review Certificate for the demolition of the
existing commercial building on the property finding that the building is not significant as
it is a modern intrusion into the historic area.
a. As the building has a Cultural Resource Survey record (K-396.203) from the survey
completed associated with the National Register nomination for the Victorian
Dover Historic District, the appropriate survey forms should be completed to
record its demolition (when it occurs).
b. The building footprint will need to be appropriately stabilized if project site
construction is not progressing at the time of its demolition.
2. Recommends conditional approval of the Architectural Review Certificate for the
construction of the Retail/Apartment Building #1 finding the overall building to be of a
contemporary design yet compatible with the buildings of this block of the Historic District
which includes larger multi-story commercial buildings, the Dover Fire Department
building (across Governors Avenue), and existing parking lots.
3. These conditions are recommended to improve Retail/Apartment Building #1 project’s
compliance with the recommended guidelines of the Design Standards and Guidelines. The
following are recommended conditions:
a. The actual height measurements of the building should be confirmed to ensure
compliance with the height (in feet) limitations for the zoning district.
b. Signage identifying the commercial tenants and the apartment building main entry
should be integrated into/attached the building.
c. Confirm materials and design of the balcony railing system as a black metal system
compliant with the requirements of the Building Code.
d. Confirm the materials for the awnings and their compliance with the clear height
provisions.
2
Page 130
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 3 of 12
e. Any revisions or changes in the identified materials or refinement of the building
design may be subject to further review by the Historic District Commission.
4. Recommends conditional approval of the Architectural Review Certificate for the
Apartment Building #2 as the Historic District Commission finds it to be compatible with
the nearby residential neighborhood on South New Street.
a. The applicant’s presentation provided information on the proposed building
heights to assess its compatibility with nearby residential dwellings and other
nearby buildings.
b. The Commission found that building design addresses the pedestrian level scale
with the choices of materials and detailing of the first floor and additional
information on the roof system satisfied the concerns regarding the overall massing
of the building.
c. Comment deleted by Historic District Commission action.
d. See also the statements in Comment #5.
5. These conditions are recommended to improve the Apartment Building #2 project’s
compliance with the recommended guidelines of the Design Standards and Guidelines. The
following are recommended conditions:
a. This is a four story building with the first floor occupied by the ground level
parking area then floors 2-4 as apartments.
b. Recommend consideration of alternative designs of the building roof form to divide
into smaller areas (multiple ridgelines) or other opportunities to provide space for
mechanical equipment areas.
c. Recommend consideration of additional design changes to present a building of
small parts such as setbacks of upper two floors, greater stepping of the building
front façade wall planes, etc.
d. Recommend the use of architectural shingles for the main roof surface.
e. Signage identifying the apartment building main entry should be integrated into the
building. It currently appears to be located as a projecting sign over the gable roof
of the entry which may be difficult to see.
f. Confirm materials and design of the balcony railing system as a black metal system
compliant with the requirements of the Building Code.
g. Any revisions or changes in the identified materials or refinement of the building
design may be subject to further review by the Historic District Commission.
6. The following items should be clarified regarding the Building #1 and Building #2 design in
order to confirm compliance.
a. Clarify the type of system proposed for gutters and downspouts.
b. Clarify the size of the balcony areas to ensure they are sized for usable space.
c. Clarify the installation format of the Hardie-board siding i.e. exposure width, etc.
d. The applicant should be aware of the implications regarding the type of
construction for the building.
e. With the building design, the height of the finished floor elevation in relation to the
sidewalk and parking lot must be considered in order to achieve accessibility into
the building. If additional building elements are required to achieve accessibility,
they may require further review by the Historic District Commission.
3
Page 131
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 4 of 12
7. Some of the site improvements/amenities were not specifically described with the
application information. Please provide information for consideration and discussion.
a. Light fixtures/poles utilized along the streetscape should continue style of the
lighting used in the Downtown Loockerman Street areas. A taller two-light style
fixture may be more appropriate within the parking lot areas.
b. Identify the materials for the open space areas including surface pavement, benches
or other seating, bicycle parking rack, etc.
c. Identify the design and materials of the fence including pillars along South New
Street. The materials selected must be appropriate for use within the Historic
District. Staff recommends the use of a black metal picket style fencing with a
maximum height of four feet.
d. Identify areas where the sidewalks or portions of the sidewalks will be constructed
of brick or a grass landscape strip will be implemented. The use of brick paving
materials for sidewalk construction is a key feature found throughout the Historic
District area.
i. The grass strip should be implemented in the areas of South New Street
were the existing curb cut will be removed.
ii. The City’s standards for sidewalk format must be met.
e. Any unused curb cuts along the two street frontages must be removed.
8. Since the gazebo originally proposed for the area north of Building #2 is to be removed
from the plan, Commission recommends consideration of a design for a pergola attached to
the north wall of building which could provide a shaded area in proximity of the open
space/recreation area.
9. For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector and Office of the Fire Marshal
for these requirements. The resolution of these items can impact the site design or building
exterior finishes or design in some instances.
10. The proposed landscaping including tree plantings should be completed with species
appropriate to the site conditions of an urban area. Consultation with the City’s arborist
regarding the tree species selected is recommended especially regarding any new street
trees.
11. The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on these properties. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing
with archaeological resources including previous studies at the subject location.
12. In the event, that major changes and revisions to the building design and materials or site
plan occur in the finalization of the site plan and/or construction drawings contact the
Department of Planning and Inspections. These changes may require resubmittal for
review by the Historic District Commission.
13. This site development plan for this project is also subject to the application and review
process for Site Development Plan or Site Development Master Plan (Article 10 §2 of the
Zoning Ordinance) before the Planning Commission. Note: Additional technical items for
compliance with the Zoning Ordinance and other regulations may be identified during the
4
Page 132
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 5 of 12
Site Plan Process. Review comments pertaining specifically to the Site Plan set will be
issued at that time.
14. The applicant shall be aware that Building Permits and Demolition Permits are required to
proceed with any demolition or construction activities on the property. The permit
applications must comply with the approvals granted through the Architectural Review
Certification process.
15. The applicant shall be aware that a Sign Permit is required to proceed with the placement
of signage on the property.
This Recommendation is forwarded to the Planning Commission for the final action on the
revised Architectural Review Certification.
The following information was considered by the Historic District Commission in marking their
recommendation including the initial recommendations made by Planning Staff in regards to the
application. Discussion at the Historic District Commission meeting also included a
presentation of the project;, designation of parking areas; the marketing and phasing of the
project; additional information on the building height, materials, and detail;, scale of buildings
to adjacent neighborhood areas; the size and massing of Building #2;the potential for adding
green space; and materials selected.
Property Information:
The subject site consists a twentieth century commercial building currently divided into two
tenant spaces: a retail tenant and a day care center facility. A portion of the existing parking is
managed by the Downtown Dover Partnership as a permit parking lot.
The property is located within the boundaries of the National Register of Historic Places listed
Victorian Dover Historic District (K-396) but the existing commercial building is considered a
non-contributing building. The description of the building from the district nomination describes
it as a one story masonry food chain establishment circa 1970. Historically, this block of
Downtown was part of an area known as the Comegy’s Lots laid out in the 1850s with
development occurring 1859-1885. The 1868 Beers Map shows the subject site primarily vacant
with one building owned by L. Geiser and a school building. By 1885, a series of residential
dwelling fronting on both Governors Avenue and New Street are in existence. The subject site is
just north of the original building location of the Robbins Hose Fire Company building. The
1887 Map of Dover published by W.B. Roe continues to show a public school in the southern
portion of the site with dwellings to the north. Review of the Sanborn Fire Insurance Map Series
from 1885 – 1944 with updates also documents the history of buildings on the subject site. The
1885 Map shows a two story school building and a Sunday School & Meeting House building
with a series of two story residential dwellings with accessory buildings (garages, sheds). By
1897 the school building is replaced by a Methodist Protestant Church building with the
residential dwellings remaining. These uses for the subject site continue through the early
twentieth century. By mid-twentieth century, the church building is replaced by a one story
cinderblock store building adjacent to Governors Avenue. In the late 1960s, the subject site is
redeveloped with the existing masonry commercial building setback in the middle of the block;
its construction appears to have eliminated approximately nine residential dwellings.
5
Page 133
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 6 of 12
The entire project site is located with the local Historic District Zone (H) and subject to the
provisions of the Zoning Ordinance, Article 3 §21 and referenced sections.
PROJECT PROPOSAL (Drawings dated 6/14/2011):
This proposal involves the construction of two buildings each addressing one of the street
frontages of the subject site. The project has the potential to be developed in phases. The existing
multi-tenant commercial building will be demolished.
The first building is the Retail/Apartment Building #1 fronting on South Governors Avenue. This
is four story masonry building. The building overall has three main sections: first section giving
the appearance of one building; section two as the main entry to the apartment building is setback
and utilizes an alternative material pattern and taller roof line; and then the third section which
mimics the commercial first floor of section one but has an alternative design of the upper floors
which step back and provide a difference format to the balcony placements for the apartment
units.
The east/front façade of the commercial retail on the first floor consists of display windows in a
glass storefront window system with the glass entry doors for each tenant space. A series of
awnings are placed on the building to shade each space. The upper floors, where the apartments
are to be located, have grouped sets of windows and balcony areas. The balconies on the top
floor are shaded by awnings. On the north and south elevations of Building #1, the first floor
storefront windows are continued for part of the side. There are single windows in the stair tower
elements as well. These elevations are also divided by changes in the exterior finish and selected
detail elements. The west elevation of Building #1 faces the interior of the block and is designed
in a similar fashion as the east/front façade. On the first floor smaller awnings shade rear entries
to the commercial units and the upper floors continue the window and balcony systems.
The predominant exterior finish materials for the building are brick, a stucco treatment, and
Hardie-board (a fiber-cement product). Variation in the wall detailing is provided through the use
of multiple brick colors, use of different materials for different sections of the building, and
multiple colors of Hardie-board. Brick detailing and changes in the veneer mark the
foundation/base on the building and the transitions between the floors with banding. A multi-part
cornice line indicates the transition to the flat roof. The storefront window openings appear to use
clear glass. At the apartment level, the windows are matched to transom windows above and are
divided light windows set in groupings of three to five windows.
The second building is the Apartment Building #2 fronting on South New Street. It is also
considered a four story building (not three story as labeled on the plan drawings). The first floor
or ground level is a parking garage of twenty-three spaces. Then there are three floors of
apartment units. The first floor of Building #2 is clad in brick with decorative grillwork in the
window-like openings which allow light and air into the parking level. On the west elevation
(façade facing South New Street) the main entry is centered under a covered area with a gable
front roof. Also on this façade are two sets of false garage doors in a double carriage style door
design .The upper floors are clad in Hardie-board laid in a horizontal pattern with some banding
6
Page 134
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 7 of 12
details. The windows are paired in sets of two with matching transoms above. The balconies are
accessed by sets of double doors and a located in the four bays of the building which step out
towards South New Street. Overall, Building #2 is topped with a large turned gable roof with a
single ridge running the length of the building. Four smaller gable roof topping the balcony bays
punctuate the large roof at its eaveline. Standing seam metal roofing is utilized for these smaller
roof structures. The north and south elevations on the sides of this building continue the exterior
finish pattern of brick on the first floor with Hardie-board above but with single windows. The
rear elevation facing the interior of the parcel uses the same exterior finish pattern; however, the
window and balcony pattern is slightly different. For this elevation, the projecting bays include
windows only and the balconies are located in the plane of the main building wall. Again a gable
roofed entry is centered on the elevation and is flanked by the larger parking garage entry
openings (two-way traffic).
The project also includes site improvements ranging from parking lot reconfiguration to
landscaping. The mid-block space between the two buildings is designed to serve as the parking
lot for the buildings and includes several islands planted with trees. The parking area is
accessible from both South Governors Avenue and South New Street. There are two areas of
landscaping and hardscape which serve as recreation areas for the apartments. The area near
South New Street includes a fence parallel to the street. The gazebo shown in this submission has
been removed from the project due to lack of compliance with setback requirements for such
structures as associated with recreation areas. The location of mechanical equipment to serve the
buildings is not shown on the plans/drawings.
See attached concept site plan drawing and series of color renderings of each proposed building,
detailed information on building forms, locations, and material choices.
Review of DESIGN STANDARDS AND GUIDELINES
The subject project site is located in the Dover Historic District Zone within the Loockerman
historic context. The Loockerman historic context is described on pages 2-7 through 2-8 .
Location within the Dover Historic District Zone requires proposals for demolition, new
construction, additions, and certain renovation or rehabilitation activities to existing buildings to
receive an Architectural Review Certificate.
As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone,
an Architectural Review Certificate will be granted “if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement location and materials affecting the
exterior appearance are generally in harmony with neighboring structures and complementary to
the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2,
the Historic District Commission will provide a recommendation to the Planning Commission
regarding the project’s compliance with the architectural review standards.
This proposal must be reviewed for conformity with the design criteria guidelines found in
Chapter 4: New Construction, Additions, Demolition and Relocation. For the demolition of the
existing mid-late twentieth century building on the site, the review considerations are those
7
Page 135
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 8 of 12
associated with “Demolition.” For the new retail/ apartment building and the apartment building,
the applicable review considerations are those associated with “New Construction.” Information
on the proposed project and the review considerations is given below.
Demolition
The Design Standards and Guidelines gives guidance to the Historic District Commission by
listing specific criteria to be evaluated when considering applications for the demolition of
buildings (or portions of buildings) in the historic district. (Chapter 4: pages 4-10 to 4-12) These
guidelines are summarized below (see Design Standards and Guidelines for the complete text).
1. Determine the financial implications of maintaining a property versus demolition.
2. Regardless of economic issues the relative significance of the individual buildings
slated for demolition should be evaluated.
3. In development related applications the City should review the schematic plans for
the new structures to weigh the virtues of the new structure versus what exists.
4. Determine the extent of adequate recordation of a property the applicant would be
required to complete if demolition were approved.
5. Lots left vacant by demolition should be treated in a manner that is sympathetic to
the historic context.
New Construction
The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8)
provide the design criteria and development guidelines. The guidelines specify the following
individual considerations for new construction to be considered in the review by the Historic
District Commission (and Planning Commission) of the project for Architectural Review
Certification:
Style
Scale (building to reflect dominant cornice and roof height of adjacent buildings)
Elevation of the First Floor
Floor-to-Floor heights
Bays, windows and doors (size, relationship, spacing of)
Absolute Size (compare overall size of new building)
Massing (relationship of solid-to-void)
Orientation (location of primary façade)
Proportions (comparison of height to width of building and elements)
Materials
Forms (shape of building and roof to be complementary)
Siting (location of building on lot and in relation to street)
High density/ large-scale construction
The proposed project must also be reviewed for compliance with the standards established by the
Zoning Ordinance. The standards include items such as setbacks from property lines, lot
8
Page 136
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 9 of 12
coverage, height, etc. This proposal for Building #1 and Building #2 appears to conform to the
bulk requirements of the C-2 Zoning District including setbacks, building height, floor area ratio,
and lot coverage. The City of Dover Zoning Ordinance authorizes the Historic District
Commission to waive certain bulk standards when issuing its recommendation to the Planning
Commission for an Architectural Review Certificate if necessary to achieve architectural
compatibility in the Historic District.
STAFF COMMENTS AND RECOMMENDATIONS
The following are Staff comments and recommendations for this application regarding project
activities and Architectural Review Certification.
1. Staff recommends approval of the Architectural Review Certificate for the demolition of
the existing commercial building on the property finding that the building is not
significant as it is a modern intrusion into the historic area.
a. As the building has a Cultural Resource Survey record (K-396.203) from the
survey completed associated with the National Register nomination for the
Victorian Dover Historic District, the appropriate survey forms should be
completed to record its demolition (when it occurs).
b. The building footprint will need to be appropriately stabilized if project site
construction is not progressing at the time of its demolition.
2. Staff recommends conditional approval of the Architectural Review Certificate for the
construction of the Retail/Apartment Building #1 finding the overall building to be of a
contemporary design yet compatible with the buildings of this block of the Historic
District which includes larger multi-story commercial buildings, the Dover Fire
Department building (across Governors Avenue), and existing parking lots.
3. These conditions are recommended by Staff to improve Retail/Apartment Building #1
project’s compliance with the recommended guidelines of the Design Standards and
Guidelines. The following are recommended conditions:
a. The actual height measurements of the building should be confirmed to ensure
compliance with the height (in feet) limitations for the zoning district.
b. Signage identifying the commercial tenants and the apartment building main entry
should be integrated into/attached the building.
c. Confirm materials and design of the balcony railing system as a black metal
system compliant with the requirements of the Building Code.
d. Confirm the materials for the awnings and their compliance with the clear height
provisions.
e. Any revisions or changes in the identified materials or refinement of the building
design may be subject to further review by the Historic District Commission.
4. Staff recommends that action on the Architectural Review Certificate for the construction
of the Apartment Building #2 be deferred to allow additional information and an
alternative design to be submitted. This multi-unit residential building with its
contemporary design must strive to be compatible with the nearby single family detached
9
Page 137
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 10 of 12
dwellings and duplex dwellings of predominately two story buildings. The current design
appears to be very large in overall form, scale, and proportion.
a. The submission does not provide information on the proposed building heights
(eave, ridge, mean) or streetscape views to assess its compatibility with nearby
residential dwellings and other nearby buildings.
b. While the building design attempts to address the pedestrian level scale with the
choices of materials and detailing of the first floor, the overall massing of the
building is a concern. The main roof design appears to add significant additional
height to the building which may only cover a large attic space.
c. The building has a very suburban design feel and not one that is responsive to the
neighborhood around it other than its placement close to the street.
d. See also the statements in Comment #5.
5. These conditions are recommended by Staff to improve and achieve the Apartment
Building #2 project’s compliance with the recommended guidelines of the Design
Standards and Guidelines. The following are recommended conditions:
a. This is a four story building with the first floor occupied by the ground level
parking area then floors 2-4 as apartments.
b. Recommend an alternative design of the building roof form to divide into smaller
areas (multiple ridgelines) to look more residential than commercial. This could
also provide an opportunity for mechanical equipment areas.
c. Recommend additional design changes to present a building of small parts such as
setbacks of upper two floors, greater stepping of the building front façade wall
planes, etc.
d. Recommend the use of architectural shingles for the main roof surface.
e. Signage identifying the apartment building main entry should be integrated into
the building. It currently appears to be located as a projecting sign over the gable
roof of the entry which may be difficult to see.
f. Confirm materials and design of the balcony railing system as a black metal
system compliant with the requirements of the Building Code.
g. Any revisions or changes in the identified materials or refinement of the building
design may be subject to further review by the Historic District Commission.
6. The following items should be clarified regarding the Building #1 and Building #2 design
in order to confirm compliance.
a. Clarify the type of system proposed for gutters and downspouts.
b. Clarify the size of the balcony areas to ensure they are sized for usable space.
c. Clarify the installation format of the Hardie-board siding i.e. exposure width, etc.
d. The applicant should be aware of the implications regarding the type of
construction for the building.
e. With the building design, the height of the finished floor elevation in relation to
the sidewalk and parking lot must be considered in order to achieve accessibility
into the building. If additional building elements are required to achieve
accessibility, they may require further review by the Historic District
Commission.
10
Page 138
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 11 of 12
7. Some of the site improvements/amenities were not specifically described with the
application information. Please provide information for consideration and discussion.
a. Light fixtures/poles utilized along the streetscape should continue style of the
lighting used in the Downtown Loockerman Street areas. A taller two-light style
fixture may be more appropriate within the parking lot areas.
b. Identify the materials for the open space areas including surface pavement,
benches or other seating, bicycle parking rack, etc.
c. Identify the design and materials of the fence including pillars along South New
Street. The materials selected must be appropriate for use within the Historic
District. Staff recommends the use of a black metal picket style fencing with a
maximum height of four feet.
d. Identify areas where the sidewalks or portions of the sidewalks will be constructed
of brick or a grass landscape strip will be implemented. The use of brick paving
materials for sidewalk construction is a key feature found throughout the Historic
District area.
i. The grass strip should be implemented in the areas of South New Street
were the existing curb cut will be removed.
ii. The City’s standards for sidewalk format must be met.
e. Any unused curb cuts along the two street frontages must be removed.
8. Since the gazebo originally proposed for the area north of Building #2 is to be removed
from the plan, Staff recommends consideration of a design for a pergola attached to the
north wall of building which could provide a shaded area in proximity of the open
space/recreation area.
9. For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector and Office of the Fire Marshal
for these requirements. The resolution of these items can impact the site design or
building exterior finishes or design in some instances.
10. The proposed landscaping including tree plantings should be completed with species
appropriate to the site conditions of an urban area. Consultation with the City’s arborist
regarding the tree species selected is recommended especially regarding any new street
trees.
11. The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on these properties. The State
Division of Historical & Cultural Affairs can provide technical assistance when dealing
with archaeological resources including previous studies at the subject location.
12. In the event, that major changes and revisions to the building design and materials or site
plan occur in the finalization of the site plan and/or construction drawings contact the
Department of Planning and Inspections. These changes may require resubmittal for
review by the Historic District Commission.
11
Page 139
HI-11-04 Acme Site Redevelopment Master Plan
Architectural Review Recommendation Report from the Historic District Commission
From the July 21, 2011 Meeting
Page 12 of 12
13. This site development plan for this project is also subject to the application and review
process for Site Development Plan or Site Development Master Plan (Article 10 §2 of the
Zoning Ordinance) before the Planning Commission. Note: Additional technical items for
compliance with the Zoning Ordinance and other regulations may be identified during the
Site Plan Process. Review comments pertaining specifically to the Site Plan set will be
issued at that time.
14. The applicant shall be aware that Building Permits and Demolition Permits are required
to proceed with any demolition or construction activities on the property. The permit
applications must comply with the approvals granted through the Architectural Review
Certification process.
15. The applicant shall be aware that a Sign Permit is required to proceed with the placement
of signage on the property.
Historic District Commission Action on July 21, 2011
The Historic District Commission considered the proposal and provided a recommendation to the
Planning Commission in regards to the Architectural Review Certification for the project site
development master plan. The recommendation should reflect consideration of the Design
Standards and Guidelines. The specific conditions of the recommendation are noted in the
Report under the heading “Recommendation of the Historic District Commission.”
12
Page 140
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF August 4, 2011
PLANNING COMMISSION MEETING OF August 15, 2011
Plan Title: Dove View
S-11-12
Plan Type: Site Plan
Property Location: West of Saulsbury Road and on the north side of Forrest Avenue
Property Addresses: 101-405 Doveview Dr.
Tax Parcel: ED-05-076.07-01-30.00-000
Owner: CRM Mid-Atlantic, LLC
Present Zoning: RG-5 (General Residence for Mid Rise Apartments Zone)
COZ-1 (Corridor Overlay Zone) a portion of
Existing Use: 2 partially constructed buildings
Proposed Use: 3 Apartment Buildings (Total 144 units)
Site Area: 6.7326 ac. +/-
Building Area: Existing – 30,590 S.F.
Proposed – 15,295 S.F.
Total – 45,885 S.F.
Impervious Areas: Existing – 54.7%
Proposed – 64.5%
Waivers Requested: None
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 141
C P
I L
T A
CITY OF DOVER Y N
N
DEVELOPMENT ADVISORY COMMITTEE O I
F N
APPLICATION REVIEW COMMENTARY G
D
D.A.C. MEETING DATE: August 4, 2011 O
V
E
APPLICATION: Dove View at Dove View Drive R
FILE #: S-11-12 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Janelle M. Cornwell, AICP PHONE #: (302) 736-7196
PLAN SUMMARY:
This Plan is for review of the Site Plan for Dove View. The plan includes the construction of a
four story 43,885 SF apartment building and other associated site improvements including the
completion of two partially constructed apartment buildings for a total of 144 apartment units.
The property is 6.73 acres ± and is zoned RG-5 (General Residence Zone for Mid-Rise
Apartments) and subject to the COZ-1 (Corridor Overlay Zone). The property site is located
west of Saulsbury Road and north of Forrest Avenue (Delaware Route 8). The owner of record
is CRM Mid-Atlantic, LLC. The property addresses are 101-405 Doveview Drive. Tax Parcel:
ED-05-076.07-01-30.00
Previous Applications
The site was previously approved as a Planned Neighborhood Design: Senior Citizen Housing
Option known as DoveView (C-06-02) for four (4) buildings with 192 dwelling units. This plan
was reviewed by the Planning Commission on August 22, 2006 and Final Plan Approval was
granted on October 23, 2007. Construction commenced on two of the proposed apartment
buildings. Construction ceased on the site for more than a year and the Site Plan and Building
Permits have expired. There are two partially constructed buildings on the site.
The Planning Commission reviewed a rezoning request for the property from IO (Institutional
Office Zone) to RG-5 (General Residence for Mid Rise Apartment Zone) and subject to COZ-1
(Corridor Overlay Zone) on February 22, 2011 and City Council approved the rezoning request
on April 11, 2011.
PARKING SUMMARY- Waiver Request
In the RG-5 (General Residence Mid Rise Apartment Zone) two and a quarter (2¼) parking
spaces are required for every dwelling unit and one parking space for every 200 SF of office
area. The plan proposed 144 apartment units. This requires 324 off-street parking spaces and
one (1) parking space for the office. A total of 325 parking spaces are required. The plan
indicates 325 spaces on the plan including eight (8) handicap parking spaces. The site meets the
parking requirement.
Page 142
S-11-12 Dove View
DAC Report for August 4, 2011
Page 2 of 6
Bicycle Parking
The site is required to provide bicycle parking. The bicycle parking calculation is one for every
twenty parking spaces. Based on the number of required parking spaces seventeen (17) bicycle
parking spaces are required. The plan proposes nineteen (19) bicycle parking spaces. The
locations of the bicycle racks are located throughout the site near each building.
SITE CONSIDERATIONS
Entrance
The site has two points of ingress and egress. The main entrance for the apartments is located
off of Forrest Avenue. This entrance is a shared entrance between the apartments, bank,
pharmacy, and vacant land to the west. The second entrance is located off of Saulsbury Road.
Cross access to the property to the west (Modern Maturity Center) is to be provided as a walking
path.
Dumpsters
Dumpsters for trash collection are required for the development of the site. Based on the number
of apartment units to be located within the proposed mixed use building, six (6) dumpster pads
are required. The plan proposes six dumpsters throughout the site. The site is also proposing
two dumpster pads that may be used for recycling.
Sidewalks
The site has existing sidewalks along the street frontage of Forrest Avenue and along the main
entrance drive. Sidewalk is proposed around all three apartment buildings with connections into
the site toward the stormwater management area. A sidewalk is located around the stormwater
management area that is used as part of the Active Recreation Area.
Lighting
Lighting is provided on the plan. A detail identifying the type of lighting that will be used needs
to be on the plan.
RECREATION/ OPEN SPACE:
Active Recreation Area for this project is required at a rate of 150 square feet per dwelling unit
or 10,000 SF whichever is greater. (Article 5 §10.514) Based on 144 dwelling units, 21,600 S.F.
of active recreation area is required. The Plan indicates that 21,621 S.F. +/- of land will be
reserved as active recreation space. This active recreation space consists of three areas on the
site. The first is located in the southwest portion of the site. This area includes two horseshoe
pits with picnic tables. The second area is located in the northeast portion of the site. This area
consists of a swing set, shuffleboard court and picnic tables. The final active recreation area is
located central to the site and consists of the walking path around the stormwater management
area including picnic tables and benches.
The Landscape Plan (sheet L-101) illustrates how the building will provide recreation amenities
to comply with the design specifications described in Article 5 §10 of the Zoning Ordinance.
Page 143
S-11-12 Dove View
DAC Report for August 4, 2011
Page 3 of 6
At their meeting of July 11, 2011 the Parks, Recreation and Community Enhancement
Committee recommended approval of the Active Recreation Plan for the Dove View project
(part of S-11-12).
The Planning Commission must act upon the Active Recreation Plan as part of any motion
regarding this project, or as a separate motion if necessary.
BUILDING ARCHITECTURE
The submission Plan includes the requisite Architectural Elevation drawings. The three buildings
will be four story buildings. All three buildings will have the same architecture. The proposed
architecture is the same as the previous application and partially constructed. The exterior finish
on the first floor is stone veneer. The stone veneer is also located on the second floor on the stair
towers. The exterior finish on floors 2-4 are two colors of vinyl siding. Balconies will be
provided on floors 2-4. The pitched roof will have asphalt shingles. There are gable roof
elements located along the roof line. There are windows placed throughout the building and trim
work is located between the different exterior materials.
TREE PLANTING AND LANDSCAPE PLAN
The submitted plan includes the Landscaping details. Based on the 293,272 S.F. property, a total
of 98 trees are required. The plan proposes the planting of 96 new trees with two (2) existing
trees to remain to meet the requirement. The proposed trees will be located throughout the site.
The proposed trees are a mixture including: Willow Oak, Red Sunset Maple, Sweetbay
Magnolia, River Birch, and Flowering Dogwood.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) The data column needs to be updated prior to Final Approval. Some of the items which need
revising are as follows:
a) Indicate the zoning COZ-1 (Corridor Overlay Zone) under the zoning for the site.
b) Any changes recommended by the Planning Commission.
c) Indicate that trash collection will utilize a private hauler.
d) Indicate the amount of open space provided on the site.
e) Indicate that lighting shall be provided at a minimum of 1 ½ foot candles at grade.
2) Indicate any existing or proposed easements related to utilities, stormwater, etc.
3) Revise the location of the cross access with the Modern Maturity Center to align with the
access on the Modern Maturity Center property.
4) Provide a separate lighting plan sheet.
5) Provide a separate sign and striping plan sheet.
Page 144
S-11-12 Dove View
DAC Report for August 4, 2011
Page 4 of 6
6) Provide a crosswalk going east west across DoveView Drive.
7) Provide a crosswalk from the west side of the main entrance across the drive aisle.
8) Label the road as DoveView Drive.
9) Provide construction details for the following but not limited to: sidewalk ensuring
accessibility, curbing, dumpster enclosure ensuring architecture matches the building
materials, paving, lighting, etc.
10) Provide the following information on the Landscape Plan:
a) Ensure that the benches and picnic tables are not on the slopes of the stormwater
management area.
b) Clarify the 25% open space calculation does not include the parking islands.
c) Provide a Landscape Architect or Certified Nursery Professional Certification.
11) Provide plan sheets of the Landscape and Recreation Plan and Landscape and Recreation
Plan Details as part of the Site Plan Set (as submitted for review by the Parks, Recreation
and Community Enhancement Committee).
12) The following items should be included on the Landscape and Recreation Plan to clarify the
construction of the recreation area improvements:
a) Provide a list of the proposed features on the Active Recreation Plan (i.e. the number of
benches, picnic tables, etc.).
b) Revise the square footage of the shuffleboard area on Landscape and Recreation Plan
Sheet to state 6,763 SF.
c) Provide accessibility to one picnic table in both the horseshoe and shuffleboard areas.
d) Provide accessibility to one horseshoe pit and the shuffleboard court.
e) Identify the protective ground covering material under the swing set.
f) Provide a sidewalk connection from the sidewalk near the horseshoe pits area to the
sidewalk at the end of the west side of the entrance drive.
g) Provide an accessible picnic table.
h) Provide one swing on the swing set be for a small child.
i) Replace the Ash trees with another type of tree as Ash trees are subject to disease.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) Staff recommends that any outside HVAC Equipment be designed to minimize the
impact on adjacent property owners, adequately screened from public view and the
overall visible impact on the streetscape. The location should be depicted on the plan.
ADVISORY COMMENTS TO THE APPLICANT:
Page 145
S-11-12 Dove View
DAC Report for August 4, 2011
Page 5 of 6
1) An Environmental and Structural Engineering report on the two existing building shall be
submitted as a part of the Building Permit. A Building Permit will not be issued without this
documentation.
2) The Planning Commission must act upon the Active Recreation Area Plan as part of any
motion to approve this project, or as a separate motion if necessary.
3) The Planning Commission will act upon waiver requests as part of any motion to approve
this project, or as a separate motion if necessary. Note: All waivers are at the discretion of
the Planning Commission. The Commission may approve or deny waiver requests.
4) The applicant is reminded of the requirements for construction phasing of the recreation area
as associated with the development of the residential units.
Article 5 §10.6 Construction Phasing. The recreation and open space areas shall be
completed in a proportion equal to or greater than the proportion of residential dwelling
units completed, except that one hundred (100) percent of the recreation and open space
areas shall be completed prior to issuing building permits for the final twenty (20) percent
of the dwelling units proposed. Building permits shall not be issued for dwelling units
unless the requirements of this section are met.
5) There shall be provisions which insure that the common open space land shall continue as
such and be properly managed and maintained. The developer shall either retain ownership
and responsibility for maintenance of such open land; or provide for and establish one (1) or
more organizations for the ownership and maintenance of all common open space i.e. a
Homeowners Association. The organization shall be responsible for maintenance, insurance
and taxes on the common open space.
6) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
7) Following Planning Commission approval of the Site Plan, the Plan must be revised to meet
all conditions of approval from the Development Advisory Committee or as otherwise noted.
A Check Print must be submitted for review by Planning Office Staff. Upon determination
that the Plan is complete and all agency approvals have been received, copies of the Plan
may be submitted for final endorsement.
8) In the event, that major changes and revisions to the Site Plan occur in the finalization of the
Site Plan contact the Department of Planning and Inspections. These changes may require
resubmittal for review by the Development Advisory Committee, Planning Commission, or
other commissions making recommendations in regards to the plan.
9) For building construction, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector for these requirements. The
resolution of these items may impact the site design including such items as building
setbacks from property line, building dimensions and height, building openings, and fire
protection needs, etc.
Page 146
S-11-12 Dove View
DAC Report for August 4, 2011
Page 6 of 6
10) The applicant shall be aware that Demolition Permits for each building are required to
proceed with any demolition activities on the property if necessary. The permit application
must comply with the approvals and conditions granted through the Architectural Review
Certification process.
11) The applicant/developer shall be aware that prior to any ground disturbing activities on the
site the appropriate site inspections and permits are required.
12) The applicant shall be aware that Site Plan approval does not represent a Building Permit and
associated construction activity permits. A separate application process is required for
issuance of a Building Permit from the City of Dover. The Building Permit submission must
comply with the conditions of approval of the Architectural Review Certification.
13) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or building
identification sign shall require a Sign Permit from the City of Dover prior to placement of
any such sign.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 147
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JULY 28, 2011
APPLICATION: DOVE VIEW APARTMENTS: 101 DOVEVIEW DRIVE
FILE #: S-11-12
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric
Department. Developer may be required to perform a quantity of the relocation. Any work performed by the City of
Dover will be at the owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Page 148
Dove View Apartments
File #: S-11-12
July 28, 2011
Page 2 of 4
WATER
1. The following notes must be added to the plans:
a. All water utility components must meet the requirements of the Public Utilities Water Wastewater Handbook,
effective date March 22, 2010.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Public Utilities Department specifications and requirements.
c. The site contractor shall contact the City of Dover Public Utilities Construction Manager at (302) 736-7070 prior to
the start of construction. A representative from the City of Dover Department of Public Utilities must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
2. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. This
includes domestic services lines.
3. The previous plans for this site were approved with two (2) one and one-half inch (1-1/2”) meters for each building due
to the peak demand and plumbing configuration information provided. Should this information change for any of the
three (3) buildings on the proposed plan information must be submitted to our office to verify the meter size. Please
also note that none of the buildings have had meters installed yet and the plans must be revised accordingly. The
proposed water meters must be installed in a pit per City of Dover requirements and manufacturer’s
recommendations. Also, a dual check valve is required downstream of the meter.
4. The domestic service, fire main connection and valves must be clearly shown for each building. The plans must
coincide with field conditions as to what utility work remains to be completed.
5. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The
Public Utilities Department will test and inspect all fire mains to a blind flange located inside the buildings. The blind
flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must
be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall
be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor
to the ninety degree (90°) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls
and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with
mechanical designer.
WASTEWATER
1. The following notes must be added to the plans:
a. All wastewater utility components must meet the requirements of the Public Utilities Water Wastewater Handbook,
effective date March 22, 2010.
b. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Public Utilities Department specifications and requirements.
c. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures. This includes sanitary sewer laterals. In
particular, both sanitary sewer laterals are not shown for the existing building to the north on the current plan as
originally approved. In addition, the lateral that is shown is depicted with a connection angle of less than ninety
Page 149
Dove View Apartments
File #: S-11-12
July 28, 2011
Page 3 of 4
degrees (90°) which is not an acceptable connection or as approved on the original plans. This must be addressed
on the current plan set as a necessary revision during redevelopment. The line must be reinstalled correctly to avoid
backups and other maintenance issues.
3. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. The Electric division noticed that the new plan no longer has four buildings. We just want to confirm that a fourth
building is not planned in the future.
2. Most of the conduit has been installed for the electric infrastructure.
3. The original design requested that dover would install security lighting. Please confirm that the new developer will be
providing site lighting.
WATER
1. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Public Utilities
Department directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
2. A majority of the water utility infrastructure has been installed for this site. As such the following apply:
a. Should any alteration be proposed, which includes but is not limited to the methodology to providing fire service to
the buildings, revised plans must be submitted for review and approval with resubmission required to the Office of
Drinking Water.
b. All applicable items necessary for construction, such as construction details and notes, must be included on the
current plan set for all water utility infrastructure work which remains to be completed.
c. All water utility infrastructure must be retested in accordance with the Water / Wastewater Handbook.
Page 150
Dove View Apartments
File #: S-11-12
July 28, 2011
Page 4 of 4
WASTEWATER
1. A majority of the wastewater utility infrastructure has been installed for this site. As such the following apply:
a. Should any alteration be proposed revised plans must be submitted for review and approval with resubmission
required to DNREC, Surface Water Discharges Section.
b. All applicable items necessary for construction, such as construction details and notes, must be included on the
current plan set for all wastewater utility infrastructure work which remains to be completed.
c. All wastewater utility infrastructure must be retested in accordance with the Water / Wastewater Handbook
STORMWATER
1. None.
GENERAL
1. The plan set references that the contractor should utilize Miss Utility to verify the exact location of the utilities on the
site. Please note that the City of Dover will only locate electric, water and wastewater infrastructure that has been
dedicated to the City of Dover. Until such time it is the property owner’s responsibility to locate and protect these
facilities.
2. The applicant is advised that depending upon the size of any existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
3. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 151
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: D S
O H
V A
E L
R
APPLICATION: Dove View Apartments 101 Doveview Drive
FILE #: S-11-12 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
Fire lanes are ok as shown.
Any gas fired HVAC equipment must be equipped with emergency cut off switches remotely
located.
Address numbers of at least 12 inches in height must be placed on the street side of the building
visible from the street.
Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection.
Full building and fire plan review is required.
Building cannot be occupied or construction or renovations started until completion of building
and fire plan review.
All required means of egress shall have an exit discharge consisting of a non slip surface, and
leading to and terminating at a public way.
Sprinkler system required. System to be monitored.
Page 152
Fire Department connection to be located within 50 feet of main entrance.
Fire Department connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
Fire alarm system required.
Knox Box required.
Standpipes required.
Elevator cars to meet the interior dimensions set forth in the Delaware State Fire Prevention
Code.
Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
The two existing buildings will require a report from a licensed fire Protection Company stating that the installed
fire protection will perform as required and can be used as part of the project.
It is required that any and all amended construction documents be prepared by a registered and licensed design
professional. The owner is to engage and designate on the building permit application the registered and licensed
design professional in responsible charge.
The registered design professional in responsible charge shall be responsible for reviewing and coordinating
submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the
design of the building inclusive of any repairs for the same.
Work shall be installed in accordance with approved and amended construction documents, and any changes made
during construction that are not in compliance with the amended and approved construction documents shall be
resubmitted for approval and as stated here.
Research testing and reports by approved agencies are required for submission that confirm or deny the integrity of
the building(s) existing conditions including and not limited to quality, strength, effectiveness, fire resistance,
durability and life safety. Reports are required that confirm or deny the presence of mold. If mold is confirmed as
being present, then reports and methods to remediate and resolve must be approved and inspected by the appropriate
agencies having jurisdiction. The same is then required to be submitted to the City of Dover.
ADVISORY COMMENTS TO THE APPLICANT:
After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
All comments from this office, approved by the Planning Commission are at the expense of the
owner/applicant.
Page 153
The proposed building will be reviewed under Residential Occupancy.
The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all other
NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan be
submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 154
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: July 28, 2011 T
===============================================================
APPLICATION: Dove View Apartments at 101 Doveview Drive
FILE#: S-11-12 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. In order to be issued an entrance permit, the department will require the applicant to
provide the proper forms, fees, and plans.
2. ADA compliant curb ramps must be provided along the frontage of the site. Also,
pedestrian connection with the Modern Maturity Center must be provided.
3. A Traffic Impact Study (TIS) will be required for this project, since the proposed
development exceeds 50 VPH (Vehicle per Hour) or 400 VPD (Vehicle per Day).
When the study is completed, DelDOT will review it and send the recommendations
of the improvements to the City. The improvements contained in the study will be
implemented by the developer per DelDOT's discretion. To set up a scoping meeting
for this project, please contact Mr. Troy Brestel at (302) 760-2167 or via e-mail at
Troy.Brestel@state.de.us. In addition, the existing subdivision generates 668 trips per
day, and the proposed subdivision will generate 1016 trips per day. The Department
will allow a payment towards an Area-Wide Study Fee for the additional 348 trips, in
lieu of performing the TIS. The Area-Wide Study Fee is calculated at $10 per daily
trip, and it would be payable to DelDOT prior to the issuance of a Letter of No
Objection. Payment of the TIS would exempt the developer from performing the
study, but would not exempt them from participation in off-site improvements or a
Traffic Operational Analysis if one is required during the review of the entrance
plans. If the developers would like to pay the fee in lieu of doing a TIS, the
developer should contact me at (302) 760-2145.
4. Deceleration lanes will be need on Salisbury Road (KCR 156) for this project.
Page 155
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 156
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
DEVELOPER APPLICATION MEETING DATE: AUGUST 2011
APPLICATION: Doveview Apartments
FILE #: S-11-12
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH
THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE
ADDRESSED BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan
must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of
plan submittal to our office. Construction inspection fees based on developed area and stormwater facility
maintenance inspection fees based on the number of stormwater facilities are due prior to the start of construction.
Please refer to the fee schedule for those amounts.
2. The following notes must appear on the record plan:
• The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
• The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment
control measure, as it deems necessary.
• A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
3. A soils investigation supporting the stormwater management facility design is required to determine impacts of the
seasonal high groundwater level and soils for any basin design.
ADVISORY COMMENTS TO THE APPLICANT:
1. The original approved plans included the proposed apartment building. The approved plans have expired (approvals
are valid for 3 years) the project must be reviewed, re-approved and all fees must be submitted prior to any land
disturbing activity.
2. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management
plan has been approved.
Page 157
CITY OF DOVER Dover/Kent
County
DEVELOPMENT ADVISORY COMMITTEE
Metropolitan
APPLICATION REVIEW COMMENTARY Planning
Organization
D.A.C. MEETING DATE: 8/4/2011
APPLICATION: Dove View Apartments at 101 Doveview Drive.
FILE #: S-11-12 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Jim Galvin, AICP PHONE #: (302) 387-6030
The Dover/Kent County MPO requested the opportunity to bring the recommendations on issues of our
concern to the City. The MPO limits comments to development proposals and applications that may lead to
new development. Issues of concern to the MPO are effective transit, reducing the amount of vehicle
emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including
bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the
standard for all applications, not to be waived.
City of Dover Planning Commission 8/15/2011
Project Review
S-11-12 Dove View Apartments at 101 Doveview Drive.
This proposal was the subject of a rezoning application a few months ago. The MPO doesn’t typically
comment on rezoning applications. The facility has access to both Saulsbury Road and Forrest Ave/DE 8.
Forrest Ave. is a state bicycle route that currently is not improved for bicycles. It is a project in the MPO’s
draft regional bicycle plan. There are transit stops at the Modern Maturity Center immediately to the west and
at Gateway West across Forrest Ave. from the site. As a condition of a Modern Maturity approval, pedestrian
access has been required to the subject site. There are sidewalks leading for the residential area to DE 8 but
not to Saulsbury Road along the access drive. The only other stretch of missing sidewalk in the area is at the
frontage of the subject site along Forrest Ave/DE 8.
Sidewalks should be installed at both frontage locations and interior connections as a condition of approval.
With the recommendations above, the site meets the standards the MPO considers important. We have no
objections to the plan with the recvommendations.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 158
City of Dover
DATA SHEET FOR RECREATION PLAN REVIEW
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF July 11, 2011
Planning Commission Meeting of August 15, 2011
Plan Title: Dove View Apartments
Plan Type: Site Development Plan: Active Recreation Area Plan
Location: North side of Forrest Avenue just west of Saulsbury Road
Tax Parcel Number: ED-05-076.07-01-30.00-000
Owner: CRM Mid-Atlantic, LLC
Site Area: 6.7326 Acres +/-
Proposed Use: 3 Residential Apartment Buildings- 144 apartments
Zoning: RG-5 (General Residence for Mid-Rise Apartments Zone)
COZ-1 (Corridor Overlay Zone)
Project Summary
Dove View apartments will be reviewed as a Site Development Plan. The subject property
consists of one parcel of land totaling 6.8326 acres +/-. The Site Development Plan is to permit
the construction of three (3) residential buildings with 144 apartments. This application is for the
completion of the two existing buildings and the construction of a third building for a total of
144 apartments. Two of the buildings were partially constructed as a part of an expired
Conditional Use Site Plan known as DoveView Planned Neighborhood Design- Senior Housing
Option. (C-06-02)
Active Recreation Area Plan Summary:
As part of the Site Plan review process for this project, the applicant prepared a Conceptual
Recreation Plan which illustrates how the Dove View development will provide recreation
amenities in accordance with the design specifications described in Article 5, Section 10 of the
Zoning Ordinance. The Plan indicates that 24,541 S.F. of land would be reserved as Active
Recreation Area. The Active Recreation Areas are in central locations on the site. The proposed
amenities include a walking path with benches and picnic tables around the stormwater
management pond, and area with horseshoe pits with picnic tables, and an area with a
shuffleboard court, swing set, and picnic table.
This active recreation area plan must be reviewed by the Parks, Recreation, and Community
Enhancement Committee for a recommendation prior to consideration of the Site Development
Master Plan by Planning Commission.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 159
Dove View: Active Recreation Area Plan
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on July 11, 2011
Page 2 of 4
The following table provides information from the submitted Plan (dated 5/11/2011) for the
Active Recreation Area to be constructed:
Required Provided on Plan
Active Recreation Area 150 S.F. per dwelling unit or Shuffleboard, swing set and
(Article 5 §10.514) 10,000 SF whichever is picnic tables area = 6,763 SF
greater to be provided on site. Walking Area with benches
and picnic tables = 13,125 SF
144 DU = 21,600 SF Horseshoe pits with picnic
Provided: 24,541 SF tables = 4,653 SF
Active Recreation Amenities Accessible Located through the
(Article 5 §10.15) development.
Active Recreation Amenities Age Oriented to development The walking area with
(Article 5 §10.15) benches and picnic; the
horseshoe pits with picnic
tables; and shuffleboard court
with swing set and picnic
tables would serve all ages.
Parking The particulars of the
proposed active recreation do
not have associated parking
needs.
Setbacks: 30 feet from All of the active recreation
residential lots and 25 feet areas are in compliance as
from right-of-way for street required.
Landscaping The project shows trees and
landscaping around the site
and within the various
recreation areas.
Staff Recommendations:
The following are comments and recommendations from Staff of the Planning Office following
review of the Active Recreation Area to be constructed.
1. The proposed plan meets the area requirements for the Active Recreation Area. The plan
is required to provide 21,600 SF of Active Recreation Area and it is proposing 24,541 SF
of Active Recreation Area.
2. Staff recommends approval of the walking path, benches, picnic tables, horseshoe pits,
shuffleboard court and swing set.
3. Staff recommends denial of all of the grass area (as delineated on the plan) around the
walking path as active recreation area as this area is part of the stormwater management
area. The walking path itself is counted towards the active recreation area. The walking
path is calculated by itself. (Article 5 Section 10.155) The area in the immediate
Page 160
Dove View: Active Recreation Area Plan
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on July 11, 2011
Page 3 of 4
proximity of the benches and picnic tables should count towards the active recreation
area.
4. Staff recommends that one swing on the swing set be for a small child.
5. The following items should be included on the Plan to clarify the construction of the
recreation area improvements:
a. Provide a list of the proposed features on the Active Recreation Plan (i.e. the
number of benches, picnic tables, etc).
b. Revise the square footage of the shuffleboard area on Landscape and Recreation
Plan Sheet to state 6,763 SF.
c. Provide accessibility to one picnic table in both the horseshoe and shuffleboard
areas.
d. Provide accessibility to one horseshoe pit and the shuffleboard court.
e. Identify the protective ground covering material under the swing set.
f. Provide a sidewalk connection from the sidewalk near the horseshoe pits area to
the sidewalk at the end of the west side of the entrance drive.
g. Provide an accessible picnic table.
6. The applicant is reminded of the requirements for construction phasing of the recreation
area as associated with the development of the residential units.
Article 5 §10.6 Construction Phasing. The recreation and open space areas shall be
completed in a proportion equal to or greater than the proportion of residential dwelling
units completed, except that one hundred (100) percent of the recreation and open space
areas shall be completed prior to issuing building permits for the final twenty (20) percent
of the dwelling units proposed. Building permits shall not be issued for dwelling units
unless the requirements of this section are met.
7. There shall be provisions which ensure that the common open space land (including
active recreation area) shall continue as such and be properly managed and maintained.
The developer shall either retain ownership and responsibility for maintenance of such
open land; or provide for and establish one (1) or more organizations for the ownership
and maintenance of all common open space i.e. a Homeowners Association. The
organization shall be responsible for maintenance, insurance and taxes on the common
open space.
a. Add a note on the Site Plan regarding who is responsible for maintenance, and
insurance on the common open space.
8. In the event, that major changes and revisions to the Site Plan occur in the finalization of
the Site Plan contact the Planning Office. Examples include reorientation of buildings,
relocation of site components like stormwater management areas, and increases in floor
area. These changes may require resubmission for review by the Development Advisory
Committee, Planning Commission, or other agencies and commissions making
recommendations in regards to the plan.
The Parks, Recreation, and Community Enhancement Committee shall submit to the Planning
Commission a report detailing the recommendations as to the Recreation Area Plan.
Page 161
Dove View: Active Recreation Area Plan
Summary Report of Active Recreation Component
Parks, Recreation & Community Enhancement Committee Meeting on July 11, 2011
Page 4 of 4
Attachments: Active Recreation Plan Set dated May 11, 2011.
List of Amenities
Cost Estimate of improvements
Page 167
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF August 4, 2011
PLANNING COMMISSION MEETING OF August 15, 2011
Plan Title: Wesley College Master Plan for Streetscape Campus
Enhancements
S-11-13
Plan Type: Site Development Master Plan
Property Addresses: Multiple Addresses
Location: Wesley College Campus generally located north of Division Street
between North Governors Avenue and North State Street
Tax Parcels: Street and Alley Right-of-ways (to be abandoned)
Multiple Adjacent Parcels
Owner: Wesley College
Site Area: 14.3 acres+/- (total campus area)
Project Area: 3.4 acres +/-
Present Use: College campus crossed by a series of public streets and alleys
Proposed Use: College campus with streetscape enhancements from the
abandonment of designated streets and alleys
Sewer & Water: City of Dover
Zoning Classifications: IO (Institutional and Office Zone)
RGO (General Residence and Office Zone)
H (Historic District Zone)
Waivers Requested: None
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 168
C
I P
T L
Y A
CITY OF DOVER N
O N
DEVELOPMENT ADVISORY COMMITTEE F I
N
APPLICATION REVIEW COMMENTARY D G
O
D.A.C. MEETING DATE: August 4, 2011 V
E
R
APPLICATION: Wesley College Master Plan for Streetscape Campus Enhancements:
Site Development Master Plan
FILE#: S-11-13 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn E. Melson-Williams, AICP PHONE#: 736-7196
PLAN SUMMARY:
This Plan is for review of a Site Development Master Plan for the site planning and streetscape
campus enhancements associated with the abandonment of designated sections of North Bradford
Street, Fulton Street, Cecil Street, and several alleys in the Wesley College campus area. The
submission includes the Record Plan for vacated right-of-way and a Master Plan consisting of five
phases of site improvements including pedestrian amenities, paving, landscaping, and parking lot
reconfiguration/construction. This project is located in the area of the Wesley College campus
generally located north of Division Street between North Governors Avenue and North State Street.
The properties are zoned IO (Institutional and Office Zone) and RGO (General Residence and
Office Zone) with a property subject to the H (Historic District Zone). The applicant is Wesley
College. Property Addresses: Multiple. Tax Parcels: Multiple. Council Districts 3 and 4.
Previous Application
This project is associated with MI-10-06 Request for Street and Alley Abandonment: Wesley
College. Wesley College requested that the City abandon portions of the specific streets and
alleys in the vicinity of Wesley College in anticipation of implementation of a Wesley College
Master Plan.
The street and alley abandonment request was reviewed by the Planning Commission on April
19, 2010 and reviewed by the Utility Committee of City Council on May 24, 2010 and June 28,
2010 (with Public Hearing). Resolution #2010-05 adopted by City Council on July 12, 2010 set
the public hearing on the abandonment request. Following a Public Hearing on August 9, 2010,
the City Council August 9, 2010 approved Resolution #2010-07 that approved the alley and
street abandonments for seven (7) areas along with a series of conditions. See the motion to
adopt the Resolution and the attached copy of the Resolution.
The motion for adoption of the proposed Resolution #2010-07, vacating and abandoning the
alleys and streets on the condition that the Wesley College Plan include the replacement of
existing parking and an increase in total parking, that the utility easements remain in effect, that
public access easements for Fulton and Cecil Streets be part of the plan, that the timing of the
street and alley closures be coordinated with the site plan approval, and that the aforementioned
DAC comments generated by this process and those included in the DAC Application Review
Page 169
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 3
Commentary (see Exhibit #9 to the July 12, 2010 Council Minutes) are included as part of the
plan, and that public access easements be provided through the campus along Fulton and Cecil
Streets, was carried by a unanimous roll call vote (Mrs. Russell and Mr. Ruane absent) and
Council adopted Resolution #2010-07, as follows.
The specific conditions of the Resolution included: the City retains a utility easement on the
streets and alleys; public access easements are to be established for Fulton Street and Cecil Street
through the campus; set the timing of the abandonment to coincide with physical construction in
accordance with a site plan approved by the Planning Commission; required the establishment of
permanent utility easements for public electric, water, wastewater, and storm sewer
infrastructure; required that all on-street parking displaced by project must be replaced in-kind
prior to its removal; and compliance with comments from the DAC Report including agency
comments.
The specific areas approved for abandonment are listed in the chart below.
Area #1 100 block of North Governors Avenue Alley West: Alley between
North Governors Avenue and North New Street from Cecil Street to
Fulton Street
Area#2 Southern portion of the 200 block of North Governors Avenue Alley
East: A portion of alley between North Bradford Street and North
Governors Avenue, north of Cecil Street
Area #3 Portion of unit block of North Bradford Street: A portion of North
Bradford Street between W. Division and Fulton Streets
Area #4 Unit block of Fulton Street: Fulton Street between North Governors
Avenue and North State Street
Area #5 Portion of Unit block of Cecil Street: A portion of Cecil Street
between North Governors Avenue and North State
Area #6 Portion of 200 block of North Bradford Street: A portion of North
Bradford Street between Cecil and Mary Streets
Area #7 Northern portion of the unit block of North State Street Alley West: A
portion of alley between North State Street and North Bradford
Street, south of Fulton Street and north of W. Division Street
The current submission also includes Area #8 a segment of Fulton Street Alley South which runs
between North Bradford Street and the North State Street Alley West. It runs through an area
that is currently an existing parking lot. This alley segment (Area #8) was not been approved
for abandonment with Resolution #2010-07. If this alley was abandoned previously,
documentation of such action must be submitted. If not then, a specific request for its
abandonment must be submitted and complete the review and abandonment process.
SITE DEVELOPMENT MASTER PLAN
The plan for this campus streetscape enhancement project is submitted for review under the Site
Development Master Plan process (See Zoning Ordinance, Article 10 §2.58 listed below (Code
in place at time of application filing)). This process allows for a series of construction phases to
be outlined in a Master Plan for Planning Commission review and approval. Prior to each Phase
of construction a Site Plan specific to that phase is submitted for Administrative Site Plan
review.
Page 170
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 4
2.58 Site development master plans. Site development master plans shall depict a generalized
site development proposal that reflects general compliance with all applicable provisions of article
10, [sub] section 2.5 above, and shall also reflect the following information on the plan:
(1) [The] plan shall illustrate distinct phase boundaries for each proposed construction phase and
shall detail proposed construction and site improvements planned for each phase. Bulk
quantities and area totals for each construction phase, and for the total site, shall be
tabulated in a data column on the plan.
(2) Each construction phase shall be enumerated in sequential order on the site development
master plan according to the order of construction contemplated by the plan. Phases shall be
implemented in accordance with the approved site development master plan.
(3) Each construction phase represented on the master plan shall be planned and designed to
function independent of construction and site improvements contemplated in future
construction phases in all respects, including but not limited to bulk area provisions of the
zoning district in which the site is located, off-street parking requirements, site entrances,
emergency access requirements, site utilities, and stormwater management improvements.
(4) Any special agreements or conditions of approval relative to the overall development that
have been specified by regulatory agencies shall be documented on the site development
master plan.
Site construction plans, details, and specifications are not required as part of a site development
master plan submission. Final site construction plans, including detailed site grading, paving,
utilities, stormwater management, and tree planting and preservation plans shall be submitted for
final approval by the planning director, and/or authorized designee, and to other agencies having
jurisdiction, on a phase by phase basis in accordance with the approved site development master
plan, and all regulations of the City of Dover governing the approval of site plans as set forth in
[this] article 10, section 2 of this ordinance.
PROJECT SUMMARY: Multiple Phases
Record Plan
A Record Plan set (three sheets) presents the overall right-of-way areas approved to be vacated.
City Council has approved the abandonment of Areas #1-7. Area #8 must be requested and
reviewed. The Record Plan will also need to show the locations of the utility easements for
public electric, wastewater, storm sewer infrastructure and the location of the public access
easements for Fulton and Cecil Streets through the campus. The Record Plan will indicate the
disbursement of the vacated right-of-way into tax parcels from the City of Dover to Wesley
College.
Project Proposal:
The project consists of a series of site improvements including pedestrian amenities, paving,
landscaping, and parking lot reconfiguration and parking lot construction. The street and alley
areas approved for abandonment are the principal locations of the enhancements along with other
immediately adjacent areas. The project involves removal of currently paved areas and sidewalk
areas then with paver covered areas, landscaped open space, a rain garden, etc. constructed in its
place.
The proposed plan will consist of several phases of construction focused on specific areas of the
Wesley College campus. The following phases have been identified for the project as listed
below. The vacated areas (of the street and alley rights-of-ways) are listed for each phase.
Phase 1: Area #3 and Area #7 (and Area #8) – Reconfiguration of existing parking access
and circulation.
Page 171
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 5
Phase 2: Area #3 and Area #7 - Creation of pedestrian plaza area at the South Circle
entrance of the DuPont College Center. Elimination of parking spaces and
reconfiguration parking spaces along vacated areas of Fulton Street.
Phase 3: Area #3 and Area #7 – Reconfiguration and expansion of existing parking lot at
the rear of the Alumni House, Student Financial Planning Offices, and Enrollment House
properties.
Phase 4: Area #5 and Area #6 – Creation of pedestrian plaza area at North Circle entrance
of DuPont College Center. Elimination parking spaces and reconfiguration of parking
along remaining segment of Cecil Street.
Phase 5: Area #6 – Reconfiguration of parking spaces in area between two dormitory
buildings from angled parking to regular head-in parking.
The Plan submission includes the series of drawings. These drawings present Existing
Conditions with Demolition Plan, Site Plans of enhancements, general Landscape Plans, and the
Phasing Plan.
SITE CONSIDERATIONS
PARKING SUMMARY
The abandonment of these public streets and subsequent improvements will displace a significant
number of existing on-street parking spaces currently utilized by students, staff, employees, and
visitors to Wesley College. A specific plan to accommodate the displaced parking has been
submitted which consists of reconfiguration of several existing parking lots to improve access
and vehicle circulation and also consists of construction of an expanded parking lot. The plan
indicates that there is a total of 249 existing parking spaces and that the proposed number of
parking spaces will be 249 parking spaces. (Note: There are other existing parking lots on the
Wesley College campus that are unaffected by the project activities and are not included in these
tallies.) From Staff’s calculations it appears a total of sixty-five (65) “on-street” parking spaces
and seven (7) parking lot spaces will be displaced with the improvements (total of 72 spaces).
These 72 displaced spaces are accounted for by thirty-seven (37) space claimed in existing
parking lots (spaces reclaimed in Campus Community School parking lot for College use) and
thirty-five (35) parking spaces will be gained in the construction of new parking spaces. The
specific location of handicapped accessible parking spaces is not indicated.
There are a number of areas that while they appear to be “streets” in the design layout, they are
to be considered parking lot areas as the previous street right-of-way has been vacated. The only
public street segments that remain in this campus vicinity are the segment of North Bradford
Street just off West Division Street and the segment of Cecil Street between North State Street
and the Lands of Yost/North State Street Alley West. See comments for recommendation on the
on-street parking for Cecil Street (remaining public street segment).
Bicycle Parking
The minimum bicycle parking is one (1) bike space for every twenty (20) parking spaces. Based
on the number of parking spaces, a minimum of thirteen (13) bicycle parking spaces are
required. The Plan currently does not indicate the location of bicycle parking racks.
Page 172
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 6
Sidewalks
The site has an existing system of sidewalks along the public street frontages of North State
Street, Cecil Street, Fulton Street, North Bradford Street, and North Governors Avenue. The
sidewalk system then internally links to various buildings and parking lots. A significant portion
of this project will augment the pedestrian system with walking plaza areas to the north and
south of the H.B. DuPont College Center building in the areas where Cecil and Fulton Streets are
being vacated.
Other Site Elements
The location of site lighting is not shown on the plan.
TREE PLANTING AND LANDSCAPE PLAN
The submitted plan includes the concept for landscaping the project area. It is presented for the
South Project Area and the North Project Area (with the DuPont College Center being the
dividing line). Information on the trees within close proximity to the vacated rights-of-way and
the enhancement areas is provided. Staff notes that the Wesley College campus includes other
trees that are not documented on the plan sheets.
It is unclear of the specific area used to calculate the tree planting requirement for the project.
The campus area generally located north of Division Street between North Governors Avenue
and North State Street to just north of Cecil Street includes a significant number of existing tree
plantings. Staff recommends that the area as depicted on the phasing plan (Phases 1-5) which
includes the vacated rights-of-way and the adjacent areas where improvements are proposed be
utilized as the site area for the tree planting calculations. One tree is required for every 3,000
square feet of this site area. Existing trees within this area can be counted towards compliance
with this planting requirement.
The plan does show a number of existing trees, most of which are to be retained. The plan shows
a series of smaller trees to be relocated as part of project activities. The proposed tree plantings
are a mix of deciduous and ornamental trees that will line the pedestrian plaza areas or infill
other lines of street trees. The specific species selected will be identified with the Site Plans for
each Phase. For the South Project Area a total of sixty-six (66) existing trees are shown with nine
(9) trees to be removed, seven (7) to be relocated, and twenty-four (24) new trees to be planted.
For the North Project Area a total of thirty-two (32) existing trees are shown with three (3) trees
to be removed and thirteen (13) new trees to be planted.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
Record Plan
1) Area #8 (Fulton Street Alley South) was not been approved for abandonment with Resolution
#2010-07. Documentation of its previous abandonment must be submitted or a specific
request for its abandonment must be filed and the proper review procedure completed for this
Area #8. The applicant has been advised as to the process for consideration of the request.
Page 173
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 7
2) The recordation of the vacated rights-of-way shall coincide with the conditions outlined in
the Abandonment Resolution #2010-07.
3) The data column (Record Plan Sheet 1) needs to be updated prior to Final Approval. Some of
the items which need revising are as follows:
a) Check owner of record information.
b) Remove tax parcels numbers which are not affected by this action to vacate right-of-way:
ED-05-77.05-01-14.00 and 16.00 and 17.00; ED-05-76.08-05-51.00; and ED-05-76.08-
02-78.00 and 79.00.
c) Add tax parcel for tennis court parcel.
d) Clarify ownership and parcel status of ED-05-77.05-01-29.00 and 30.00 and 31.00. Also
update associated Site Plan sheets providing this information as well.
e) Correct the zoning classification to be City of Dover zoning.
4) A series of notes must be provided on the Record Plan addressing the following: information
on the Resolution to vacate the right-of-way, public utility easements, and public access
easements. The location of these utility and access easements must be shown on the Record
Plans.
5) Add appropriate certification notes and signature lines for the City and property owners.
6) While labeled by vacated area, these labels are difficult to associate with the subject areas;
we recommend a different format to the labeling.
7) The property lines and building footprint information appears to be missing from the parcels
at the northeast corner of West Division Street and North Bradford Street. Revise Sheet 1 and
Sheet 3.
8) Sheet 2 of Record Plan:
a) Add reference to distance from Mary Street for the beginning point of Area #2 as Mary
Street is not shown on the plan sheet.
b) Need to show all of Parcel 41.00 on the east side of North Bradford Street (student dorm
building).
9) Sheet 3 of Record Plan:
a) The meaning of label L-6 not listed (south end of North State Street Alley West).
b) Update Sheet Title (it is not a Topographic Road Survey).
10) The applicant will need to work with City Staff and the City Solicitor’s Office in regards to
the format for this Record Plan set and any associated documents to convey the right-of-way
from the City of Dover to Wesley College. This includes the format of new parcels, easement
locations, the timing of abandonment, terminology, etc.
Site Development Master Plan
11) Each plan sheet must include a north arrow, graphic and written scales. Several of plan
sheets are either missing these items or have conflicting information in the title block.
Page 174
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 8
12) The data column (Sheet C-001) needs to be updated prior to Final Approval. Some of the
items which need revising are as follows. Also listed are other necessary revisions to the plan
sheet.
a) Update Property Map Number listing to include all impacted parcels. Also check parcel
numbers listed as first and last numbers are not part of this project.
b) Remove statement about SWPOZ as no parcels are impacted by this zoning overlay.
c) Check spelling in column.
d) In Item #12, the parking does not reflect a total of all parking available in this portion of
campus, but only appears to be the parking in the impacted areas.
e) Clarify the tree planting calculation.
f) In General Notes #11, add Kent Conservation District.
g) In General Notes #12, update to reference to Department of Public Utilities.
h) Update the Sheet Index. Some sheets are repeated in the listing. It is also noted that the
plan set submitted does not consist of all the plan sheets proposed.
i) Overall drawing of campus area: Not all parcel lines are shown, missing line work; use
different hatch pattern for building footprints of non-Wesley properties.
j) Update location map to include all parcels impacted by abandonment and project
activities.
k) Any changes recommended by the Planning Commission.
13) Sheets C-101 and C-102:
a) Clarify the line work for the existing parking spaces as many are difficult to see due to
overlap or line weight or the lines appear to be missing. As displacement of existing
parking is a key element to be accounted for this information must be clearly provided.
b) Check the ownership of the property north of the Bellmeyer Honors House as a different
owner is listed on the Record Plan.
c) Check that the trees marked for removal or relocation on the Landscape Plan are correctly
reflected here. Also reference the Landscape Plan for any tree protection measures.
d) Identify the type of parking on the west end of Parcel 27. If this is motorcycle parking,
then identify if a newly designated parking area will be established for this vehicle type.
e) Update label for the North State Street Alley West and the right-of-way size.
f) Correct any labeling overlaps.
14) Sheets C-201, C-202, and C-203:
a) Identify location of traffic circulation signage i.e. Do Not Enter, One Way, etc.
b) Identify the location of the handicapped parking spaces and ensure access to nearby
sidewalk systems.
c) Remove extra hatch marks from location of demolished building.
d) Notes for labels G-8 through G-10 are not listed.
e) Check type of curb prosed at terminus of North Bradford Street at curved of parking lot
entrance and plaza area.
15) The remaining segment of North Bradford Street near Division sheet shall have two way
travel. Clarify the travel of one way north for the drive aisle that continues north along the
frontage of Zimmerman Hall. The addition of traffic control signage at the parking lot
connection may be necessary.
Page 175
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 9
16) The RGO zoning district has a maximum of 85% lot coverage per parcel. Provide the lot
coverage calculations for the parcels fronting on North State Street where parking lot
reconfigurations and construction on proposed.
17) Confirm that the existing sidewalks in the campus areas leading to the enhancement project
area in good repair and make any repairs necessary.
18) Ensure handicapped access ramps are shown at the required points of intersection of streets,
parking lot entrances, intersections of sidewalks with parking lot drive aisles, etc.
19) A number of existing street signs and traffic control signs (i.e. one way, do not enter) will
need to be removed at locations where public streets have been vacated and the traffic
circulation pattern has changed (segment of North Bradford Street that will become two way
travel), etc.
20) Construction details including the height and materials for items such as sidewalks, light
fixtures, fencing, bollards, traffic control signage, striping, etc. must be included in the Site
Plan sets for each phase.
21) Landscape Plan Sheets L-101 and L-102:
a) The tree planting requirement must be clarified and the site area clearly shown on the
plan. Staff has determined the specific site area to be utilized for this calculation (see
narrative above).
b) Ensure that tree planting locations do not conflict with existing or proposed utilities.
Confirmation with the Electric Department for the planting of trees near overhead power
lines will be necessary.
c) Remove the Tree Mitigation Chart. The trees proposed for removal by these plans are not
considered as “unauthorized clearing” which necessitate tree mitigation measures with
the rates listed.
d) Identify tree protection measures for trees in or close to construction activities.
e) Landscape certification note will need to be added.
f) Add tree protection and planting details.
g) Mark trees 50 and 51 to be removed on drawing.
h) Add location of existing trees on the Admissions Parking lot parcel.
i) Identify where relocated trees will be placed.
j) Correct label of Bulk Table on sheet L-1012.
22) The Phasing Plan has several reprints of labels. Also any public street segments that have
been vacated as part of the abandonment process should not be labeled by their “street”
name. This also occurs on other plan sheets.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) Staff recommends that the Applicant work with City Staff regarding parcel consolidation. It
appears that a number of parcels in the ownership of Wesley College could be consolidated
Page 176
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 10
so that buildings do not cross property lines i.e. the dormitory buildings north of Cecil Street
or the parking lot area east of North Bradford Street.
2) Staff recommends the reconfiguration of the on-street parking on the remaining public street
segment of Cecil Street. At the western terminus of the public street just west of the North
State Street Alley West intersection, a turn-around should be established. Also the angled
parking on the south side of the street should be reversed so that exiting the parking space
can be achieved by backing then immediately proceeding eastbound on Cecil Street to North
State Street. Any additional parking spaces displaced by this revision must be accounted for.
3) Staff recommends providing bicycle parking opportunities near each of the campus buildings
to adequately address the bicycle parking needs of each building. The code requirement of
thirteen bicycle parking spaces (based on the parking spaces of this project) will not be
sufficient to address bicycle parking needs and to encourage a multi-modal campus.
4) Planning Staff notes that Parcel ED-05-77.05-01-35.00-000 (Enrollment House) is located
within the H (Historic District Zone). Construction activities in the Historic District require
Architectural Review Certification. A parking lot will be expanded into the rear yard area of
the parcel. However, due to the lack of visibility (public view) from North State Street (the
public way), Staff finds that the Architectural Review Certification review is not required for
the parking lot.
ADVISORY COMMENTS TO THE APPLICANT:
1) This project requires additional coordination with various City departments to address utility
infrastructure access, the need to maintain emergency access, and the development (and
approval) of a Record Plan documenting a transfer of ownership of the vacated rights-of-way
and the associated easements.
2) Abandonment of public streets and alleys by Resolution #2010-07 does not constitute
approval for physical alteration of such streets and alleys. Any modification or ground-
disturbing activity must be reviewed through the appropriate site plan process and receive all
requisite approvals by regulatory agencies.
3) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
4) In the event, that major changes and revisions to the plan occur in the finalization of the Site
Development Master Plan or plan submissions contact the Department of Planning and
Inspections. The changes may require resubmittal for review by the Development Advisory
Committee, Planning Commission, or other agencies and commissions making
recommendations in regards to the overall Master Plan.
5) Following Planning Commission approval of the Site Development Master Plan, the Record
Plan must be revised to meet all conditions of approval from the Development Advisory
Committee or as otherwise noted. A Check Print must be submitted for review by Planning
Office Staff. Upon determination that the Plan is complete and all agency approvals have
been received, copies of the Plan may be submitted for final endorsement prior to
Page 177
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements: Site Development Master Plan
DAC Report of August 4, 2011
Page 11
recordation. Each phase of construction is subject to the Administrative Site Plan review
Process.
6) To progress to construction, the submission of a Site Plan of the construction phase project
area must be submitted for Administrative Site Plan Review by the Planning Office and other
agencies. Article 10 §2.491b (as in Code at time of application filing) sets forth the
construction timing in relation to approvals.
Article 10 §2.491
(b) For projects which are reviewed and approved by the planning commission as site development master
plans, approval of the master plan shall remain valid for a period not to exceed five years from the date of
planning commission approval, provided that the authorized construction or use has commenced within one
year of approval and is proceeding toward completion, unless an extension of time is applied for by the
applicant and granted by the planning commission. In addition, the time between the completion of one
phase and the initiation of the next phase shall not exceed a period of two years. Upon approval of a site
development master plan by the planning commission, the planning director or authorized designee shall
have approval authority over final plans governing each phase of construction as depicted on the master
plan.
7) For construction of structures, the requirements of the building code or fire code must be
complied with. Consult with the Chief Building Inspector for these requirements. The
resolution of these items may impact the site design.
8) Construction and demolition will have an effect on the visitors to this area, adjacent property
owners, and nearby streets. Any work requiring the closing or rerouting of students,
residents, employees or visitors to the adjacent properties and streets should be coordinated
as to offer the least amount of inconvenience. Careful consideration will need to be given to
construction staging/ storage areas, and parking availability for this project.
9) With the vacation of several street segments, the property addresses for several buildings will
need to be reviewed and revised as necessary to clarify emergency response/911 addressing.
10) A number of the trees to be removed are significant in size. Consider actions for salvage and
re-use of the tree wood for special projects, fundraisers, etc.
11) The applicant shall be aware that prior to any ground disturbing activities on the site the
appropriate site inspections and permits are required. Building Permits will be utilized to
track project activities.
12) The applicant shall be aware that Site Development Master Plan approval does not represent
a Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Building Permit from the City of Dover. The Building
Permit submission must comply with the conditions of approval.
13) The applicant shall be aware that Site Development Master Plan approval does not represent
a Sign Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the City of
Dover prior to placement of any such sign.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 178
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JULY 28, 2011
APPLICATION: WESLEY COLLEGE MASTER PLAN: STREETSCAPE
CAMPUS ENHANCEMENTS
FILE #: S-11-13
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
1. Owner is responsible for locating all water, sewer, storm sewer lines and private electric.
2. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
3. Owner is responsible for site and/or street lighting.
4. Meter locations will be determined by City of Dover Engineering Department.
5. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
6. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric Department.
Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
7. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to construction.
Owner is required to sign off plans prepared by the Electric Department.
8. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
9. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
WATER
1. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. The
consultant should continue to work with the Public Utilities Department to ensure this information is accurate on the
plan.
WASTEWATER
1. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures. The consultant should continue to work with the
Public Utilities Department to ensure this information is accurate on the plan.
Page 179
Wesley College Master Plan
File #: S-11-13
July 28, 2011
Page 2 of 3
STORMWATER
1. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
GENERAL
1. In accordance with Council Resolution #2010-05 utility easements must be established as per the Public Utilities
comments from the DAC report dated April 1, 2010. As such the vacated right-of-way plan can only be recorded in
conjunction with easement establishment.
2. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
3. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER
1. The Public Utilities Department is currently evaluating water infrastructure in the project area to ensure that any
requiring upgrade or replacement will be addressed prior to the improvements proposed. Our office recommends that
as a condition of approval the Department be permitted to install all identified improvements in accordance with the
Water / Wastewater Handbook which may include relocating and upgrading meters outside of existing buildings. All
relocations would be coordinated with the College if the Department determines that any are required.
WASTEWATER
1. The Public Utilities Department is currently evaluating wastewater infrastructure in the project area to ensure that any
requiring upgrade or replacement will be addressed prior to the improvements proposed. Our office recommends that
as a condition of approval the Department be permitted to install all identified improvements in accordance with the
Water / Wastewater Handbook which may include relocating or adding cleanouts one foot (1’) outside the utillty
easement line. All relocations would be coordinated with the College if the Department determines that any are
required.
STORMWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. The electric division is currently working with Becker Morgan to determine utility relocation.
WATER
1. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Public Utilities
Department directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
WASTEWATER / STORMWATER
1. None.
GENERAL
1. The applicant is advised that depending upon the size of existing water services and sanitary sewer laterals to be
abandoned, flowable fill may be required.
Page 180
Wesley College Master Plan
File #: S-11-13
July 28, 2011
Page 3 of 3
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 181
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: D S
O H
V A
E L
R
APPLICATION: Wesley College Streetscape_____________________________________
FILE #: S-11-13 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Any bollards used shall be approved by the Fire Department.
2. Trees and bushes shall not be planted as to block Fire Department aerial and ground
ladder access to the building.
3. Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
NONE
ADVISORY COMMENTS TO THE APPLICANT:
1. After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
2. All comments from this office, approved by the Planning Commission are at the expense
of the owner/applicant.
3. The proposed building will be reviewed under Occupancy.
Page 182
4. The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all
other NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
5. The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan
be submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy
being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 183
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: July 28, 2011 T
===============================================================
APPLICATION: Wesley College Master Plan for Streetscape Campus Enhancements
FILE#: Z-11-05 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. As noted in the letters dated July 25, 2011 from both the City Officials and the
applicant, the Department has concurred with the supportive approaches to rescind
from the original comment about performing traffic count at numerous intersections.
As a result, the Department has no comments for the first two phases of this project.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 184
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
DEVELOPER APPLICATION MEETING DATE: JANUARY 2011
APPLICATION: Wesley College Master Plan
FILE #: S-11-13
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
The reasons and conditions applied to this project and their sources are itemized below:
Source: Delaware Sediment and Stormwater Regulations
Requirements:
1. As the disturbance for this site will exceed 5,000 square feet, an application for a Standard Plan for Erosion and
Sediment Control must be submitted to and approved by the Kent Conservation District prior to any land
disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking place.
2. The following notes must appear on the plan:
The Kent Conservation District reserves the right to enter private property for purposes of periodic
site inspection.
The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment
control measure, as it deems necessary.
A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
3. All drainage ways and storm drain should be contained within drainage easements and clearly shown on the
plan to be recorded by Kent County.
4. Include any onsite and offsite utility work on the plans.
Comments:
1. The proposed improvements are planned on existing impervious areas. The proposed improvements can
be approved as Standard Erosion and Sediment and Stormwater Control Plan.
Page 185
Dover/Kent
CITY OF DOVER County
Metropolitan
DEVELOPMENT ADVISORY COMMITTEE
Planning
APPLICATION REVIEW COMMENTARY Organization
D.A.C. MEETING DATE: 8/4/2011
APPLICATION: Wesley College Master Plan for Streetscape Campus Enhancements
FILE #: S-11-13 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Jim Galvin, AICP PHONE #: (302) 387-6030
The Dover/Kent County MPO requested the opportunity to bring the recommendations on issues
of our concern to the City. The MPO limits comments to development proposals and
applications that may lead to new development. Issues of concern to the MPO are effective
transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and
facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all
applications, not to be waived.
City of Dover Planning Commission 8/15/2011
Project Review
S-11-13 Wesley College Master Plan for Streetscape Campus Enhancements
This proposal was the subject of a street and alley abandonment application in April, 2010. The
MPO encourages pedestrian facilities. The proposed facilities will accommodate bicycles as well,
also promoted. There are transit stops on South State Street and South Governors Ave to connect
into the City’s and regional transit system.
With the recommendations above, The site proposal meets the standards the MPO considers
important. We have no objections to the plan.
If you have any questions or need to discuss any of the above comments,
please call the above contact person and the Planning Department as soon as
possible.
Page 189
City of Dover
July 25, 2011
Julio Seneus
Delaware Department of Transportation
Division of Planning
P.O. Box 475
Dover, DE 19903
RE: Wesley College Site Development Master Plan
DelDOT TIS Requirements and Traffic Counts
Dear Mr. Seneus:
Please see the attached letter from Jonathan Street of Becker Morgan Group, submitted on behalf
of Wesley College. As you are aware, there have been a number of discussions regarding
whether the streetscape project proposed by Wesley College meets the warrants for a traffic
impact study. Earlier discussion between Wesley College and DelDOT indicated that DelDOT
would require that Wesley College perform traffic counts at several intersections, and that
DelDOT would input these counts into a digital model to determine necessary improvements to
the street network surrounding Wesley College.
I concur with the letter submitted by Mr. Street, indicating that the streetscape project proposed
by Wesley College does not meet the threshold criteria that would indicate that a traffic impact
study is required. The improvements proposed by Wesley College would eliminate two access
points to North Governors Avenue and North State Street, and the proposal would not expand the
school’s facilities or increase the number of vehicle trips to and from the college. The streetscape
project is aimed at making the Wesley College campus more conducive and safer for pedestrians.
If traffic counts and a traffic analysis are performed, I would question what would be gained by
this. Wesley College is located in the City’s downtown and is surrounded by residential
neighborhoods on a traditional street grid. Any improvements to intersections relating to
accommodating vehicles would have the potential to detract from the character of the downtown
area and create obstacles for the many pedestrians who utilize the street network. The
improvements proposed by Wesley College would improve the safety of the area for pedestrians
and eliminate conflicts between pedestrians and vehicles utilizing the Wesley College campus.
In closing, I request that DelDOT eliminate the requirement that traffic counts be performed for
the Wesley College streetscape project because the project does not meet the thresholds for a
traffic impact study under DelDOT’s regulations and because any improvements identified
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 190
would detract from the character of the downtown area. If you have any questions, please feel
free to contact me. I look forward to seeing you at the Development Advisory Committee
meeting on Thursday.
Sincerely,
Ann Marie Townshend, AICP
Director, Planning & Community Development
(302) 736-7196
cc: Jonathan Street, Becker Morgan Group
William Johnston, President, Wesley College
Eric Nelson, Wesley College
Scott D. Koenig, P.E., Interim City Manager
Todd Sammons, DelDOT Planning
Mike Strange, DelDOT Planning
Marc Cote, DelDOT Planning
Bill Brockenbrough, DelDOT Planning
Page 191
RESOLUTION #2010-07
A RESOLUTION VACATING AND ABANDONING CERTAIN ALLEYS AND STREETS
SITUATED IN THE CITY OF DOVER.
BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
Section 1. The Council of the City of Dover hereby vacates and abandons the following streets
and alleys:
Area #1 The 100 block of North Governors Avenue Alley West, being all that
certain piece or parcel of land situated in the City of Dover, Kent County,
State of Delaware, being an improved public alley running north to south
between Cecil Street and Fulton Street, lying on the westerly side of and
running parallel to North Governors Avenue, said alley being 10 feet wide
and approximately 341 feet in length and comprised of 3,410 square feet,
more or less.
Area #2 The southern portion of the 200 block of North Governors Avenue Alley
East, being all that certain piece or parcel of land situated in the City of
Dover, Kent County, State of Delaware, being an unimproved public alley
running north to south, said portion of alley located between Mary Street
and Cecil Street but not adjacent to and lying on the easterly side of and
running parallel to North Governors Avenue, unimproved alley being a
varying width (10-15 feet) and approximately 100 feet in length,
comprised of 3,410 square feet, more or less. The portion of the alley is
located approximately 173 feet east of the center of Governors Avenue
and 302.6 feet south of the southerly right of way line of Mary Street to
the point of beginning, thence extending approximately 100 feet in a
southerly direction and terminating at lands of Wesley College.
Area #3 A portion of the unit block of North Bradford Street, being all that certain
piece or parcel of land situated in the City of Dover, Kent County, State of
Delaware, said portion of street commencing at the southerly side of
Fulton Street and running south toward Division Street but not adjacent to,
being 60 feet wide and approximately 363 feet in length, comprised of
approximately 21,600 square feet (0.496 acres). The portion of said street
starting at the southern right of way of Fulton Street and extending
approximately 363 feet in a southerly direction to the northerly right of
way line of an unnamed alley.
Area #4 The unit block of Fulton Street, being all that certain piece or parcel of
land situated in the City of Dover, Kent County, State of Delaware, a
public street running east to west between South Governors Avenue and
North State Street and being 60 feet wide and approximately 680 feet in
length, comprised of 40,800 square feet (0.936 acres) more or less.
Page 192
Area #5 A portion of the unit block of Cecil Street, being all that certain piece or
parcel of land situated in the City of Dover, Kent County, State of
Delaware, said portion of street commencing at the easterly side of South
Governors Avenue and running east towards North State Street but
stopping short of, being 60 feet wide and approximately 443 feet in length
comprised of 26,580 square feet (0.61 acres) more or less. The portion of
said street, starting at the easterly right of way line of North Governors
Avenue extending 443 feet east to a point approximately 90' east of the
easterly right of way line of North Bradford Street.
Area #6 A portion of the 200 block of North Bradford Street, being all that certain
piece or parcel of land situated in the City of Dover, Kent County, State
of Delaware, said portion of street commencing at the northerly side
of Cecil Street and running north toward Mary Street but stopping short of
and being 60 feet wide and approximately 194 feet in length comprised of
11,650 square feet (0.267 acres) more or less.
Area #7 The northern portion of the unit block of North State Street Alley West,
being all that certain piece or parcel of land situated in the City of Dover,
Kent County, State of Delaware, an improved public alley running north
to south, said portion of alley being between Fulton Street and West
Division Street but not adjacent to and lying on the westerly side of and
running parallel to North State Street, being 17 feet wide improved alley
and approximately 275 feet in length, comprised of 4,675 square feet,
more or less. The portion of said alley being located approximately 221
feet west of the centerline of North State Street, starting at the southern
right of way line of Fulton Street extending approximately 275 feet in a
southerly direction to the northerly property line of lands now or formerly
of Francis A. Stratford.
Section 2. Since no person has been deprived of property by the vacating and abandoning of the
aforesaid streets and alleys, no compensation is awarded.
Section 3. The City shall retain a utility easement for the entire length and width of the aforesaid
streets and alleys and all costs of conveyance shall be borne by the property owners.
Section 4. Approval of the request is based upon the conditions that public access easements for
Fulton and Cecil Streets be included as part of the Plan; that public access easements be provided
through the campus along Fulton and Cecil Streets; and that the following Development
Advisory Committee (DAC) comments generated by this process be included as part of the Plan,
as follows:
1) Timing of the abandonment - Staff recommends that abandonment be timed
such that the City maintain ownership and maintenance of the subject streets and
alleys until such time that they are physically altered by construction in
accordance with a site plan approved by the Planning Commission.
Page 193
2) Utility Easements - All public electric, water, wastewater, and storm sewer
infrastructure must be located within permanent utility easements in accordance
with the recommendations set forth in the Public Utilities comments from the
DAC report dated April 1, 2010.
3) Parking – All on-street parking displaced by the abandonment must be
replaced in kind (in addition to any additional off-street parking required in
accordance with site plan application submissions) prior to removal of on-street
parking in the areas proposed for abandonment.
4) DAC Comments - Planning Office Advisory Comments 1-4 from Page 6 of
the Report (prepared for May 24th meeting) and the attached agency comments
from the Department of Public Utilities, Delaware Department of Transportation
(DelDOT), Kent Conservation District, and the Fire Marshal’s
5) All specific conditions developed by the Utility Committee as a request of
public testimony and/or their deliberations must be added.
Section 5. This resolution shall be effective upon the filing of a revised plot plan of the aforesaid
streets and alleys.
ADOPTED: AUGUST 9, 2010
Page 194
City of Dover
DATA SHEET FOR CONDITIONAL USE SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF August 4, 2011
PLANNING COMMISSION MEETING August 15, 2011
Plan Title: Royal Farms
C-11-05
Plan Type: Conditional Use Site Development Plan
Applicant/Owner: Roadway Express, Inc.
Equitable Owner: F&B Properties, LLC.
Location: Northeast corner of Saulsbury Road and West North Street
Address: 293 South Saulsbury Road
Tax Parcel: ED05-076.11-01-43.00-000
Site Area: 3.64 acres ±
Zoning: C-2A (Limited Central Commercial Zone)
COZ-1 (Corridor Overlay Zone)
Present Use: Vacant (formerly shipping/trucking)
Proposed Use: Retail with gasoline pumps
Sanitary Facilities: City of Dover
Water Supply: City of Dover
Waivers Requested: Partial elimination of curbing
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Page 195
C P
I L
CITY OF DOVER T A
Y N
DEVELOPMENT ADVISORY COMMITTEE N
O I
APPLICATION REVIEW COMMENTARY F N
G
D.A.C. MEETING DATE: August 4, 2011 D
O
V
E
APPLICATION: Royal Farms at 293 South Saulsbury Road R
FILE #: C-11-05 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSON: Michael J. Albert, AICP PHONE #: 302-736-7196
PLAN SUMMARY
This is a Conditional Use Site Plan Review to permit the construction of a 5,786 S.F. retail store
building, a 1,407 S.F. car wash building, eight doubled-sided gasoline pumps under two canopy
structures, and other associated site improvements. The property is zoned C-2A (Limited
Central Commercial Zone) and subject to the COZ-1 (Corridor Overlay Zone). In the C-2A
Zone, the establishment of gasoline pumps is an accessory use requiring conditional use
approval. The project consists of one (1) parcel of land totaling 3.64 acres +/-. The site is
located on the northeast corner of Saulsbury Road and West North Street. The owner of record
is Roadway Express, Inc. The equitable owner is F&B Properties, LLC. Property Addresses:
293 S. Saulsbury Road. Tax Parcel: ED05-076.11-01-43.00-000.
CONDITIONAL USE
The application is a Conditional Use Site Plan for a proposed retail store building, a car wash
building, and eight double-sided gasoline pumps under two canopy structures. The
establishment of gasoline pumps is an accessory use requiring conditional use approval from the
Planning Commission. (Zoning Ordinance, Article 3 Section 12.141)
12.1 Uses permitted. No building or premises shall be used, and no building or part of a building
shall be erected, which is arranged, intended, or designed to be used, in whole or in part, for any
purpose, except the following:
12.11 All uses permitted in the neighborhood commercial C-1 zone, with no limitation on
size of establishments.
12.12 Residences conforming to the regulations set forth in article 3, section 2.
12.13 Banks or businesses, professional or governmental offices.
12.14 Other retail and service establishments, but excluding:
12.141 Gasoline filling stations and motor vehicle storage, repair, or service,
except that gasoline pumps shall be permitted as an accessory use, subject to
conditional use approval by the planning commission pursuant to article 10,
section 1.
This Conditional Use Site Plan is subject to the requirements of Article 10 §1 further discussed
below.
Page 196
C-11-05 Royal Farms at 293 S. Saulsbury Road
DAC Report for August 4, 2011
Page 3 of 9
With Conditional Use Site Plan applications, the Planning Commission reviews the proposed
project to determine whether or not the intended use is appropriate in type and scale for the
immediate neighborhood. The Commission must also consider whether or not the proposed use
will have an adverse impact on the future orderly development of the surrounding area. The
following sections of the Zoning Ordinance (Code in place at time of application filing in July
2011.) which relates to the role of the Commission in reviewing Conditional Use Site Plan
applications are particularly relevant when reviewing this application:
Article 10 §1.1 [Accessibility for fire and police protection.] That all proposed structures,
equipment or material shall be readily accessible for fire and police protection;
Article 10 §1.2 That the proposed use be of such location, size, and character that, in general, it
will be in harmony with the appropriate and orderly development of the zone in which it is
proposed to be situated and will not be detrimental to the orderly development of adjacent
properties in accordance with the zoning classification of such properties;
PARKING SUMMARY
The minimum parking requirement for this project is one (1) parking space for 300 S.F. of floor
area or one parking space per employee, whichever is greater. Based on the square footage of
7,193 S.F., a total of 24 parking spaces are required. The site is providing 30 parking spaces.
There are two (2) handicap parking spaces shown on the plan. The site exceeds the parking
requirement. In accordance with Article 6 § 3.11 of the Zoning Ordinance, parking areas may
only exceed the parking requirement by 25%. As shown on the plan the project does not exceed
the 25% maximum.
Bicycle Parking
Bicycle parking shall be provided for parking spaces at a rate of one (1) bicycle parking space
for every twenty (20) parking spaces. Based on the 24 required parking spaces, two (2) bicycle
spaces are required. The site is in compliance with the required bicycle parking.
BUILDING ARCHITECTURE
The proposed building will feature a primarily flat roof with three pitched features facing
towards the road intersection. A brick/EFFIS mix is the primary wall feature with canopied
windows towards the building edges. The pitched portions of the roof show a red/brown metal
color and the roof line is white with a similar red/brown trim. Revised architectural renderings
should be provided in order to give a clearer view of the materials and composure of the
building.
A car wash building is proposed for the site; however, no materials have been provided to depict
the building. The Applicant must provide architectural elevations for the proposed car wash.
There are two proposed canopies associated with this gas station use that will be located over the
two pumping areas. Further detail is required in regards to these structures including elements
such as materials used, roof type and angle, and roof line décor. The Applicant must provide
architectural elevations for the proposed canopy structures.
Page 197
C-11-05 Royal Farms at 293 S. Saulsbury Road
DAC Report for August 4, 2011
Page 4 of 9
SITE CONSIDERATIONS
The site is located within the COZ-1 (Corridor Overlay Zone). The Corridor Overlay Zone as a
planning and growth management tool is designed to foster and attractive, efficient, and
economically vibrant commercial corridor along Route 8 and Saulsbury/McKee Roads. To this
end, more stringent standards are applied to development taking place in the corridor.
The plan as presented is in compliance with the requirements listed below.
• The gas pump canopy and associated pumps are considered to be a principal structure for
this use. The location of the gas pump canopy along Saulsbury Road is located along the
maximum front yard setback meeting the front-yard setback requirement. The building
must sit parallel to the road with the longest side facing the road; the design achieves this
concept.
• The plan achieves the following for the parking lot layout/arrangement: the number of
spaces versus islands (10 feet width) and median placements, and the sizing thereof.
• Site access related to number and spacing is in compliance for access to the corridor
complies with COZ-1 requirements.
• The building complies with the 35-foot height limitation.
• A minimum of 25% of the lot consists of landscaped open space.
• Street frontages are required to have a landscaped open space of 25 feet and provide one
tree per 50 (fifty) feet of frontage.
• Non-frontages (side and rear yards) are required to have landscaped open space of 15 feet
when adjacent to residential uses and to provide one tree per 75 (seventy-five) feet.
• The building shall have a corridor elevation with specific architectural features.
The plan as presented does not comply with the following requirements of the COZ-1:
• A landscaped buffer of 6 feet and sidewalk of 6 feet for a minimum total of 12 feet is
required between the building and parking/drive aisles is not met.
o The applicant has requested a waiver from this provision of the Zoning
Ordinance; however, no authority exists within the Zoning Ordinance for the
Planning Commission to provide such relief from the requirement.
o As per the most recent DAC meeting, the Applicant understands the requirement
and that the provisions of this requirement cannot be waived. The Applicant has
agreed to amend the plans during the Check Print process leading up to Final Plan
approval. The Applicant will provide information to the Planning Commission on
a means by which to appropriately implement this requirement for this project.
Site Access
The site will have full access from Saulsbury Road and right-turn in and out access from West
North Street. A copy of a Traffic Analysis Report is part of the application file.
Pedestrian Access
A sidewalk connection from Simon Circle is present on the east side of the property. This
connection does not currently connect with the proposed site. The plans should be altered to
allow for the existing pedestrian access to enter the site. This will necessitate the relocation of
the proposed car wash. The car wash should be, at a minimum, moved north on the site, out of
the way of the pedestrian access. The stacking of vehicles awaiting entrance into the wash may
be accomplished by allowing them to stack near the proposed loading area.
Page 198
C-11-05 Royal Farms at 293 S. Saulsbury Road
DAC Report for August 4, 2011
Page 5 of 9
• As per the most recent DAC meeting, the Applicant has agreed to reconfigure the
pedestrian access and to relocate the car wash. The plans shall be amended during the
Check Print process leading up to Final Plan approval and the Applicant will provide
information to the Planning Commission on a means by which to appropriately
implement this requirement for this project
Lighting
Adequate lighting needs to be provided throughout the site. The plan indicates security lighting
along the front of the buildings. The lighting should be deflected away from other properties.
The design/style of the fixtures should be provided on the Site Detail Plan sheet. A minimum of
1½ foot candles at grade is required.
Dumpster
Retail buildings require one (1) dumpster pad for the first 8,000 S.F. of building area and one (1)
for each additional 16,000 S.F. of building area or a fraction thereof. Based on this calculation
one (1) dumpster pad is required for the building. The Site Plan currently indicates two (2)
dumpster pads. The dumpster enclosures are required to match the construction materials of the
proposed buildings.
Sidewalk
Sidewalk is required along all street frontages. Sidewalk is present along. Saulsbury Road and
West North Street. Sidewalks should be barrier free to allow for access throughout the
development.
Waiver Request: Curbing
The parking areas and access drives are required to be curbed (Article 6 §3.6). Curbing is
throughout the site with several breaks or omissions to convey stormwater to the appropriate
management facility. A copy of the Preliminary Stormwater Report is on file as part of the
application. A waiver request for the elimination of curbing for drainage into the stormwater
management area has been submitted to the Planning Office for consideration by the Planning
Commission.
Loading Spaces
For retail and service establishments, one loading berth is required for buildings ranging from
8,000 S.F. to 25,000 S.F. The total building S.F. for this site is under the requirement for a
mandatory loading space; however, the plans show one loading space on the northern portion of
the parking facility. No loading spaces are specifically delineated on the plan.
TREE PLANTING AND LANDSCAPE PLAN
One (1) tree is required for every 3,000 SF of land area. The tree planting requirement is based
on the non-woodland land area. Based on the size of the site 53 trees are required. The Plan is
required to provide a multitude of plantings for various reasons including the standard planting
requirement, a buffer to separate the use from adjacent residential properties, and a frontage
planting requirement for the COZ-1. One additional consideration of this project is that
numerous plantings and trees already exist on the site.
Page 199
C-11-05 Royal Farms at 293 S. Saulsbury Road
DAC Report for August 4, 2011
Page 6 of 9
The plan as provided meets the requirement to provide one tree per 50 feet of frontage and one
tree per 75 feet of rear and side yard property boundaries. Plantings that are designated as a part
of requirement are counted towards the required fifty-three (53) plantings for this site.
Opaque Barrier
Most of the previously planted buffer area required to buffer the commercial use from the
adjacent residential properties is still present. Additional plantings are being placed along the
property boundary in order to fill in any gaps or deficiencies. The plan is in compliance with this
requirement. The required fence element is included on the plans as well, fulfilling this
requirement. Plantings that are designated as a part of this buffer may not count towards the
required fifty-three (53) plantings for this site.
While it appears that the plan as proposed fulfills the tree planting requirement of one tree for
every 3,000 S.F. of land area, due to the other planting requirements and the presentation of the
planting schedule, it is difficult to confirm this count. The plans must be revised to separate out
any plantings that are designated as part of the residential landscape buffer and place those
counts in a separate planting schedule, as they cannot be counted toward the tree planting
requirement for the site. The remaining plantings for the land area requirement should have their
own planting schedule that shows the number of proposed and preserved trees. To ensure that all
requirements are met, further clarity is needed.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) Curbing shall be constructed with in accordance with the Zoning Ordinance unless a waiver
is granted by the Planning Commission. A written waiver request has been submitted to the
Planning Office for consideration by the Planning Commission.
a) If a waiver should be granted for this site, any portions of eliminated curbing must relate
to stormwater management. Portions of the northern and southern drive aisle boundaries
lack curbing along with a potential entrance location for the future commercial pad site as
designated on the plan. Curbing for these areas may be required even if a waiver is
granted depending on their connection with stormwater management on the site.
2) Update the Project Data column with the following information:
a) Any conditions or changes approved by the Planning Commission.
b) Indicate if any waivers are granted by the Planning Commission.
3) As shown, the site does not comply with the requirements of Article 3, Section
27.63(c)(ii). This requirement states that:
There shall be a landscaped buffer area of at least 12 feet in width between the building
and parking lot and drive areas. The buffer area shall include provisions for a sidewalk of
at least six feet and no greater than eight feet in width. The buffer area and sidewalk shall
be grade separated from the parking lot by concrete curbing of at least six inches in
height.
Page 200
C-11-05 Royal Farms at 293 S. Saulsbury Road
DAC Report for August 4, 2011
Page 7 of 9
The plans must be amended to include this provision. A waiver request to eliminate this
requirement was submitted along with this application; however, the Zoning Ordinance does
not provide a mechanism by which relief from this requirement may be granted.
4) The fence component of the opaque barrier must be reduced to four feet in height within the
40 foot minimum setback along S. Saulsbury Road. The Fence Component and Landscape
Buffer Plantings will not be required to be implemented south of the adjacent pedestrian
access from Simon Circle. If they are implemented, the fence must be reduced to four feet in
height in the setback.
5) Architectural elevations for the proposed car wash and for the two canopy structures must be
submitted to the Planning Commission for review.
6) Revised architectural renderings should be provided in order to give a clearer view of the
materials and composure of the store building.
7) Plan Sheet S-1
a) Several Key Notes as listed do not appear on the plan. The plan should be checked for
consistency and notes that do not apply to this project should be removed.
b) The proposed “Red Box” kiosk is not an aspect of approval for this plan and should be
removed for Final Approval. A separate business license is required for the operation of
these kiosk elements.
8) Landscape Plan
a) The Landscape Plan should be reorganized for clarity.
b) A Planting Schedule for items related to the landscape buffer on the east and north
property lines should be created separately.
c) For purposes of the required tree plantings and corridor plantings, a different Planting
Schedule should be used. This schedule must clearly denote the number and location of
proposed and existing trees.
d) Revise the Data Column for this sheet accordingly.
9) Provide construction details for the following items but not limited to: barrier free sidewalk,
dumpster pad, curbing, traffic control signage, lighting fixtures, handicap signage, bike racks,
etc. Where traffic and pedestrian control details are concerned, please use DelDOT approved
detail drawings. Ramps and associated pedestrian elements of the site plan must comply
with applicable ADA requirements.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) The pedestrian access from Simon Circle should be integrated into the site allowing for better
access of adjacent residents. To accomplish this, the following items are suggested by Staff:
a) The proposed car wash should be relocated further north on site. Stacking should occur
along the proposed loading area portion of the drive aisle.
Page 201
C-11-05 Royal Farms at 293 S. Saulsbury Road
DAC Report for August 4, 2011
Page 8 of 9
b) The existing pedestrian access should extend from Simon Circle into the site allowing for
pedestrian movement.
c) A crosswalk connection from the pedestrian access should extend out from the pedestrian
access once implemented.
2) Staff recommends that the car wash egress be re-evaluated to avoid potential conflicts with
traffic movement into the site from North Street. Moving the car wash north on the site
would reduce this potential conflict.
3) Staff recommends that any outside HVAC Equipment be designed to minimize the impact on
adjacent property owners, adequately screened from public view and the overall visible
impact on the streetscape/complex. Indicate the location of the equipment and provide
screening (landscaping) around the equipment.
4) Staff recommends that the existing trees along West North Street that are marked for removal
should instead be preserved.
5) Recommendation on Waiver Requests:
a) Partial Elimination of Curbing: Staff recommends approval of the request to permit
depressed curbing to allow for drainage into the stormwater management areas by the
depression of curbing in areas where necessary for conveyance. The extent of curbing to
be eliminated as shown on the plans exceeds what is necessary for stormwater
management. If this waiver is granted, the plans must be altered to reduce the amount of
depressed curbing to only depict areas of depressed curb.
ADVISORY COMMENTS TO THE APPLICANT:
1) In the event that the remainder of the site is subdivided and developed at a later time,
each proposed lot will be required to conform to the requirements for plantings and open
space.
2) In the event that changes and revisions to the Conditional Use Site Plan occur in the
finalization of the Conditional Use Site Plan contact the Planning Office. Examples
include reorientation of building, relocation of site components like stormwater
management areas, and increases in floor area/unit count. These changes may require
resubmittal for review by the Development Advisory Committee, Planning Commission,
and/or other agencies and commissions making recommendations in regards to the plan.
3) Following Planning Commission approval of the Conditional Use Site Plan, the Plan
must be revised to meet all conditions of approval from the Development Advisory
Committee or as otherwise noted. A Check Print must be submitted for review by
Planning Office Staff and the other commenting agencies. Upon determination that the
Plan is complete and all agency approvals have been received, copies of the Plan may be
submitted for final endorsement.
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
Page 202
C-11-05 Royal Farms at 293 S. Saulsbury Road
DAC Report for August 4, 2011
Page 9 of 9
requirements.
5) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections, preconstruction meeting and permits are required.
6) Construction may have an effect on the adjacent property owners and nearby travel lanes.
Any work requiring the closing or rerouting of potential customers, residents, or visitors
to adjacent properties should be coordinated as to offer the least amount of inconvenience
to the adjacent property owners.
7) The applicant shall be aware that Conditional Use Site Plan approval does not represent a
Sign Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the City of
Dover prior to placement of any such sign.
8) The applicant shall be aware that Conditional Use Site Plan approval does not represent a
Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Office as soon as possible.
Page 203
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JULY 28, 2011
APPLICATION: ROYAL FARMS : 293 SOUTH SAULSBURY ROAD
FILE #: C-11-05
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The Electric Division has no comment regarding the conditional use proposed for the subject property.
2. Owner is responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The
handbook is now available on the website at the following
link: http://www.cityofdover.com/departments/electric/documents/.
3. The roadway and curbing must be in.
4. The right-of-way must be within 6" of final grade.
5. The property corners must be staked.
6. Owner is responsible for locating all water, sewer, and storm sewer lines.
7. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
8. Owner is responsible for site and/or street lighting.
9. Meter locations will be determined by City of Dover Engineering Department.
10. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
11. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
12. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
13. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
14. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
15. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
Page 204
Royal Farms
File #: C-11-0
July 28, 2011
Page 2 of 3
16. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
WATER
1. The following notes must be added to the plans:
a. All water utility components must meet the requirements of the Public Utilities Water / Wastewater Handbook,
effective date March 22, 2010.
2. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please
be advised that it is a twelve-inch (12”) water main located in North Street.
3. Water usage projections (peak demand in gpm or plumbing fixtures) must be submitted to our office to correctly
determine the size of the domestic and irrigation (if applicable) water meter for the proposed building. These
projections must be submitted prior to approval so the meter size can be placed on the final site plan. This meter
must be installed in a pit per the City of Dover requirements and manufacturer’s recommendations. Also, a dual
check valve is required downstream of the meter.
4. The site will require the installation of a fire hydrant as per the Fire Marshal’s requirements. This will require the
minimum of a six-inch (6”) tap off of the water main in Saulsbury Road. As the northern portion of the site is likely
being reserved for a future use, our office recommends that an eight-inch (8”) tap be made to ensure that a fire
suppression system could be provided to that use should it be required.
WASTEWATER
1. The following notes must be added to the plans:
a. All wastewater utility components must meet the requirements of the Public Utilities Water Wastewater Handbook,
effective date March 22, 2010.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures. The manhole located in front of this property
along North Street is actually a terminal manhole. Please contact our office regarding this.
3. The minimum sanitary sewer lateral size is six-inch (6”). The existing lateral size must be field verified to be of
adequate size in order to be utilized. If it is not, a new line must be installed.
4. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and cover to
prevent damage to the cleanout and lateral.
5. The apparent grease interceptor must be a minimum 1,000 gallon, two chamber model, meeting all Kent County
ordinance requirements. A construction detail for the proposed grease interceptor, as well as the proposed location,
must be provided on the plan.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format)
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
Page 205
Royal Farms
File #: C-11-0
July 28, 2011
Page 3 of 3
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Public Utilities
Department directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
WASTEWATER / STORMWATER
1. None
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 206
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: D S
O H
V A
E L
R
APPLICATION: Royal Farms at 293 Saulsbury Road
FILE #: C-11-05 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
Proposed building is one story. Primary fire lanes are required to be 24 feet wide and cover the
side of the building that has the primary entrance and exit. Secondary fire lanes can be reduced to
16 feet wide. Both can be no closer than 10 feet to the building and no farther than 50 feet from
the building. Fire lanes shall cover 50% of the proposed building. Show fire lane markings on
drawing.
Any gas fired HVAC equipment must be equipped with emergency cut off switches remotely
located.
Address numbers of at least 12 inches in height must be placed on the street side of the building
visible from the street.
Any natural or LP gas bottles, meters, values, regulators, etc., must have impact protection.
Full building and fire plan review is required.
Building cannot be occupied or construction or renovations started until completion of building
and fire plan review.
All required means of egress shall have an exit discharge consisting of a non slip surface, and
leading to and terminating at public way.
Page 207
As building is not sprinkler, all portions of the exterior of the first floor shall be within 400 feet
of a fire hydrant. Show location of fire hydrant on site to cover both new and future building.
Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
All comments from this office, approved by the Planning Commission are at the expense of the
owner/applicant.
The proposed building will be reviewed under Mercantile Occupancy.
The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all other
NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan be
submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 208
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: July 28, 2011 T
===============================================================
APPLICATION: Royal Farms at 293 South Saulsbury Road
FILE#: C-11-05 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. In order to be issued an entrance permit, the department will require the applicant to
provide the proper forms, fees, and plans.
2. Per Section 3.6.5 of the Standards and Regulations for Subdivision Streets and State
Highway Access Adopted February 15, 2010, an 80-foot wide right-of-way (40-feet
from the centerline) is required for a minor arterial. According to the Kent County
Classification Maps, KCR 156 (Saulsbury Road) is classified as a minor arterial road.
If the existing right-of-way does not have the proper width along the frontage of the
site, the department will require 40-feet of right-of-way dedication from the
innermost edge of the through lane for public use.
3. Per Section 3.6.5 of the Standards and Regulations for Subdivision Streets and State
Highway Access Adopted February 15, 2010, an 80-foot wide right-of-way (40-feet
from the centerline) is required for a major collector. According to the Kent County
Classification Maps, KCR 73 (W. North Street) is classified as a major collector
road. If the existing right-of-way does not have the proper width along the frontage of
the site, the department will require the right-of-way dedication for public use.
4. The proposed development will be releasing storm water into the State drainage
system. As a result, a stormwater management report (SWMR) must be provided for
review and approval prior to releasing the approval letter for the construction of the
entrance.
5. The right turns deceleration lanes into the site that will be constructed as part of this
project along the frontage roads must be shown on the plans.
6. A concrete median island will be required across from the proposed access on North
Page 209
Street to prevent weaving. Also, the developer shall perform all of the off-site
improvements as noted and recommended in the Traffic Analysis Report (TAR) letter
dated August 4, 2011.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
• This project falls within the limits of the “Saulsbury Road Extension" project. As a
result, the Department recommends that you coordinate the construction of the off-
site improvements such as deceleration lanes, striping, and curb ramps construction
along frontage roads with the Department. Please contact Mr. John Gaines at (302)
760-2335 or via e-mail at John.Gaines@state.de.us. They will be able to assist you
with the necessary coordination between the two projects. "Coordination needs to
occur prior to approval and construction. This coordination should continue into
construction.
• Provide a pedestrian connection to the adjacent residential subdivision.
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 210
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
DEVELOPER APPLICATION MEETING DATE: AUGUST 2011
APPLICATION: Royal Farms Saulsbury Road
FILE #: C-11-05
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH
THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE
ADDRESSED BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan
must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of
plan submittal to our office. Construction inspection fees based on developed area and stormwater facility
maintenance inspection fees based on the number of stormwater facilities are due prior to the start of construction.
Please refer to the fee schedule for those amounts.
2. The following notes must appear on the record plan:
• The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
• The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment
control measure, as it deems necessary.
• A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
3. A soils investigation supporting the stormwater management facility design is required to determine impacts of the
seasonal high groundwater level and soils for any basin design.
ADVISORY COMMENTS TO THE APPLICANT:
1. Green Technologies (bio retention, bio swales etc.) must be considered before traditional facilities can be considered.
2. The preferred methods of stormwater management are those practices that maximize the use of the natural features
of a site, promote recharge and minimize the reliance on structural components.
3. It is recommended that the stormwater management areas be incorporated into the overall landscape plan to enhance
water quality and to make the stormwater facility an attractive community amenity.
4. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management
plan has been approved.
5. Based on the site characteristics, a pre-application meeting will be required to discuss stormwater management and
drainage for this site.
Page 211
Dover/Kent
CITY OF DOVER
County
DEVELOPMENT ADVISORY COMMITTEE Metropolitan
APPLICATION REVIEW COMMENTARY
Planning
Organization
D.A.C. MEETING DATE: 8/4/2011
APPLICATION: Royal Farms at 293 South Saulsbury Road
FILE #: C-11-05 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Jim Galvin, AICP PHONE #: (302) 387-6030
The Dover/Kent County MPO requested the opportunity to bring the recommendations on issues of our concern to the
City. The MPO limits comments to development proposals and applications that may lead to new development. Issues of
concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and
facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle
facilities required by the City of Dover to be the standard for all applications, not to be waived.
City of Dover Planning Commission 8/15/2011
Project Review
C-11-05 Royal Farms at 293 South Saulsbury Road
This proposal is to replaces a truck depot at the corner of Saulsbury Road and North Street with a full service
convenience store with fuel pumps.
Saulsbury Road in this area is cited in the MPO’s draft Regional Bike Plan as an area that requires attention. The
Bike Plan is expected to be adopted by the MPO Council in September, 2011. There is a multi-use path on the
opposing side of North Street. There are no bicycle facilities on Saulsbury Road beyond the intersection with DE 8.
It may not impact the subject site but is included in the Plan recommendations. As stated above, the City of Dover
requirements for bicycle facilities are considered to be the minimum by the MPO and should not be waived.
The site is adjacent to an apartment complex. It is incumbent on the developer/owner to provide relatively safe
pedestrian access to the site. To accomplish this, the MPO recommends a pedestrian connection with the Simon
Circle complex approximately across from the sidewalk at the front of the building. The access may require
relocation of the car wash facilities on the site. The MPO encourages pedestrian facilities. The proposed facilities
will accommodate bicycles as well, also promoted. There are transit stops in the immediate area for DART routes
102 and 113 adding to the potential for pedestrians that may access the proposed improvements. This site has the
potential to be accessed by the greatest number of pedestrians in the greater Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.