This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
Page 1
UTILITY COMMITTEE
The Utility Committee Meeting was held on August 8, 2011 at 5:00 p.m. with Chairman Bonar
presiding. Members present were Mr. Blakeman and Mr. Snaman. Mr. Lynn and Mrs. Williams
were absent. Other members of Council present were Mr. Anderson (arrived at 5:10 p.m.), Mr. Hare
(arrived at 5:06 p.m.) , and Mr. Hutchison. Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
By unanimous consent, the agenda was approved as presented.
PACE/NAES Monthly Report (May)
The PACE/NAES Monthly Report for May 2011 was provided to members to enable them to
monitor electric sales and revenues received, which will provide a better understanding of any
fluctuations that occur and allow the opportunity to make improvements if deemed necessary.
Mr. Scott Koenig, Interim City Manager, indicated that the June report will be the last from
PACE/NAES, reminding members that the agreement with The Energy Authority (TEA) has been
completed and services began on July 1, 2011.
Mr. Blakeman noted that a line item budget is currently provided for the power supply and power
plant. He suggested that a summary of line items be included when the monthly report is submitted.
Responding, Mr. Koenig stated that TEA indicated that they plan to refashion the monthly report and
that he would advise them of this request.
Mr. Snaman moved to recommend acceptance of the PACE/NAES Monthly Report for
May 2011, seconded by Mr. Blakeman and unanimously carried.
Update - Green Energy Funding and Programming
Mr. Scott Koenig, Interim City Manager, noted that there is currently a $74,239.46 deficit in the
Green Energy Fund. He stated that as funds are received this deficit will be eliminated, since project
owners are not reimbursed until the funds become available.
Responding to Mr. Bonar, Mr. Koenig stated that he believed there was typically a six (6) month
time lapse before the City received reimbursement; however, he indicated that he would need to
confirm this time frame. Mr. Bonar requested that staff submit a letter to the Delaware Municipal
Electric Corporation, Inc. (DEMEC) to inquire as to the average turnaround time and the reason
for such a delay, and to request an itemized list of those projects that are pending reimbursement.
He advised members that he was aware of several instances when projects (outside of the City) were
funded and an inordinate amount of time elapsed after paperwork was submitted, and that paperwork
has sometimes been lost. Mr. Bonar indicated that some citizens have been “shorted” under this
program and he wanted to ensure that the City does not experience this. He stated that, according
to an investigation he performed during the last six (6) months, there is a significant concern with
these reimbursements. Mr. Bonar requested staff to provide members with an update on this issue.
Page 2
UTILITY COMMITTEE MEETING OF AUGUST 8, 2011 PAGE 2
Proposed Ordinance #2011-20 - Chapter 110 - Utilities, Article III - Water Service, Division 1 -
Generally, Section 110-67 - Private Wells
Members reviewed a proposed ordinance that would prohibit new private shallow wells within the
City of Dover. Mr. Scott Koenig, Interim City Manager, advised members that this prohibition will
protect the water resources of the unconfined aquifer from which the City draws a portion of its
water supply, as well as protect the City’s Certificate of Public Convenience & Necessity (CPCN).
He noted that, currently, private shallow wells, for irrigation purposes in particular, are permitted in
accordance with certain criteria specified in the Code.
In addition, Mr. Koenig stated that geothermal technology for heating and cooling is an emerging
technology that was not contemplated when this section of the code was implemented. Geothermal
systems require well permits from the Delaware Department of Natural Resources and
Environmental Control (DNREC), although they do not draw water from the ground. The proposed
ordinance would clarify that wells associated with the installation of closed loop geothermal systems
are permitted within the City of Dover in accordance with specified criteria.
Staff recommended adoption of Proposed Ordinance #2011-20.
Responding to Mr. Hare, Mr. Koenig stated that the City is aware of the location of the shallow
wells. He indicated that there is a requirement for an annual report to be submitted to the City
indicating usage and that the City will need to conduct inspections.
Mr. Hutchison questioned the alternatives available to property owners. Responding, Mr. Koenig
stated that if a private well is not permitted, owners could utilize their current water service for lawn
irrigation, or a second water meter could be installed to prevent paying for sewer usage on the service
to the house. He noted that the private shallow wells have served as another option for owners.
In response to Mr. Anderson, Mr. Koenig explained that every time someone drills down into the
aquifer, there is potential for current or future contamination. He stated the proposed ordinance has
a dual purpose: to protect the City’s interests and investments and to prevent possible contamination
of the aquifer.
Mr. Blakeman moved to recommend adoption of Proposed Ordinance #2011-20
(Attachment #1), as recommended by staff. The motion was seconded by Mr. Snaman and
unanimously carried.
By unanimous consent, the meeting adjourned at 5:18 P.M.
Respectfully submitted,
David L. Bonar
Chairman
DLB/DD/jg/js/tm
S:\AGENDAS & MINUTES\Committee-Minutes\2011\08-08-2011 UTILITY.wpd
Attachment
Attachment #1 - Proposed Ordinance #2011-20
Page 3
ATTACHMENT #1
CITY OF DOVER PROPOSED ORDINANCE #2011-20 Utility Committee Meeting of 08/08/2011
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL
2 MET:
3 That Chapter 110 - Utilities, Article III - Water Service, Division 1 - Generally, Section 110-67 - Private
4 Wells, be amended by deleting text indicated in red strikeout (subsection (b) Shallow wells in its entirety)
5 and inserting text indicated in bold, blue, italics as follows:
6 Sec. 110-67. Private wells.
7 (a) When authorized. It shall be unlawful and a nuisance for any person to dig, drill or otherwise
8 excavate any well more than 150 feet below the surface of the ground within the city, or one
9 mile thereof, without the permission of the city council given by resolution. No permission
10 shall be given for a well on any property where a potable water supply is available.
11 (b) Shallow wells. Shallow wells may be drilled into and water withdrawn from the unconfined
12 aquifers within the limits of the city, subject to the following:
13 (1) All wells shall require a permit from the state department of natural resources and
14 environmental control or other regulatory agency and the approval of the city setting
15 forth construction details, design yield, and withdrawal rates.
16 (2) All wells must have the approval of the state board of health or other similar regulatory
17 agency for their intended use.
18 (3) A detailed plan showing the well location, well construction, piping plan and connection
19 details shall be submitted with the application.
20 (4) All wells shall be metered by an approved device and daily pumping records maintained.
21 (5) All water derived from shallow wells shall be used only for boiler makeup, cooling water
22 use, and underground irrigation systems.
23 (6) Any revisions, changes or deviations from the original permit must be in the same
24 manner as the original permit.
25 (7) There shall be no interconnection with any public water supply, nor shall the shallow
26 well be used as a potable water supply for human consumption.
27 (8) Private irrigation systems shall be completely underground, with no connections or
28 outlets that could be used for human consumption. Irrigation shall be by sprinkler heads.
29 (b) Geothermal wells. Wells may be drilled for the purpose of the installation of a geothermal
30 heating and cooling system within the limits of the city, subject to the following:
31 (1) These wells shall not be authorized for withdrawal or injection. They will function
32 as borings, filled with a bentonite grout, with a piping system that acts as a heat
33 exchanger to dissipate/absorb heat from the system to the ground.
34 (2) There shall be no interconnection with any public water supply, nor shall the
35 geothermal well be used as a potable water supply for human consumption.
36 (3) No well shall be located within any city right-of-way or utility easement without
37 written authorization from the city manager.
38 ADOPTED: *
39 SYNOPSIS
40 The proposed ordinance would eliminate the allowance of new private shallow wells within the
41 City of Dover, and adds language to clarify that geothermal wells are permitted provided they
42 meet certain criteria.
43 Actions History
44 August 8, 2011 - Scheduled for Consideration by the Utility Committee
45 S:\ORDINANCES\2011\Draft\Ordinance 2011-20 - Irrigation Wells REVISED CURRENT.wpd