Page 1
REGULAR COUNCIL MEETING
AGENDA
April 11, 2011 - 7:30 P.M. - Council Chambers - City Hall - City of Dover
OPEN FORUM - 15 MINUTES PRIOR TO OFFICIAL MEETING (7:15 P.M.)
The “Open Forum” segment is provided to extend the opportunity to the general public to share
their questions, thoughts, comments, concerns, and complaints. Discussion of any item appearing
on the agenda is prohibited and citizen comments are limited to three (3) minutes. Council is
prohibited from taking action since they are not in official session; however, they may schedule
such items as regular agenda items and act upon them in the future.
INVOCATION BY CHAPLAIN WALLACE DIXON
PLEDGE OF ALLEGIANCE LED BY COUNCILMAN RUANE
AGENDA ADDITIONS/DELETIONS
* CONSENT AGENDA
Those items on the Council Agenda which are considered routine and non-controversial shall be
marked with an asterisk (*) and will be acted upon by a single roll call vote of the Council. There
will be no separate discussion of these items unless a member of Council so requests, in which
event the matter shall be removed from the Consent Agenda and considered a separate item.
* 1. Adoption of Minutes - Regular Council Meeting of March 28, 2011
2. Presentation - Government Finance Officers Association (GFOA) Distinguished Budget
Award
3. Proclamation - Arbor Day
4. Public Hearing/Final Reading - Proposed Ordinance #2011-01
The First Reading of the following proposed ordinance was accomplished during the
Council Meeting of February 14, 2011. Copies of the proposed ordinances are available
at the entrance of the Council Chambers.
A. Proposed Ordinance #2011-01 - Amendment to Appendix B - Zoning, Article 5
- Supplementary Regulations, (New) Section 20 - Solar and Small Wind Energy
Systems (Utility Committee)
5. Public Hearing/Final Reading - Proposed Ordinance #2011-08
The First Reading of the following proposed ordinance was accomplished during the
Council Meeting of February 28, 2011. Copies of the proposed ordinances are available
at the entrance of the Council Chambers.
A. Proposed Ordinance #2011-08 Amending the 2008 Comprehensive Plan by
replacing Map 12-1: Land Development Plan
Page 2
Council Agenda - April 11, 2011 Page 2
6. Public Hearing/Final Reading - Rezoning
A. Proposed Ordinance #2011-04 - Rezoning of Property located at Grove Street and
Railroad Avenue, owned by College Road Management, Inc., Kent Storage
Facilities, LLC, and Loralex Company, LLC, consisting of four (4) parcels totaling
30.78+/- acres. The property is currently zoned M (Manufacturing). The proposed
zoning is RG-5 (General Residence Zone for Mid-Rise Apartments). The subject
property is located north of College Road and east of the railroad corridor and
Railroad Avenue. (T AX P A R CELS : ED05-067.00-02-53.00-000, ED05-067.00-02-54.00-000,
ED05-067.00-02-55.00-000, AN D ED05-067.00-02-56.00-000; F O U RTH C O U N C IL D ISTRIC T ; P LAN NIN G
R EFEREN CE : Z-11-02) .
The First Reading of the proposed ordinance was accomplished
during the Council Meeting of January 24, 2011.
7. Final Reading - Rezoning
A. Proposed Ordinance #2011-05 - Rezoning of Property located at 101-405 Doveview
Drive (Doveview Apartments), owned by CRM Mid-Atlantic, LLC and SunTrust
Bank, consisting of 6.735+/- acres. The property is currently zoned IO (Institutional
and Office) and subject to COZ-1 (Corridor Overlay Zone). The proposed zoning is
RG-5 (General Residence Zone for Mid-Rise Apartments) and subject to
COZ-1 (Corridor Overlay Zone). The property is located on the north side of Forrest
Avenue (Route 8) just west of the Saulsbury Road intersection. (T AX P ARCEL:
ED05-076.07-01-30.00-000; F IRST C OU N CIL D ISTRIC T ; P LAN NIN G R EFEREN CE : Z-11-03). The First
Reading of the proposed ordinance was accomplished during the Council Meeting of
January 24, 2011. The Final Reading was Deferred on March 14, 2011.
* 8. Special Parks, Recreation, and Community Enhancement Committee Report -
March 24, 2011
A. Community Development Block Grant (CDBG) Application Review
(Committee Recommended that $5,000 of the City's CDBG Grant Allocation Be
Distributed to Community Connections Support Program and the Remaining
Non-public Services Funds ($37,826) Be Awarded to the Dover Interfaith Mission)
(Committee Recommended Approval of the Distribution of the CDBG Grant Monies
Based on the Scoring of the Grant Applications as follows: R C & D - $40,000; City
of Dover Streets Program - $65,580; City of Dover Community Development Projects:
Housing Rehabilitation Program - $40,000; Homeownership Assistance Program -
$40,000)
(Committee Recommended Stipulating That All Funds Recommended for Distribution
to the City of Dover Streets Program Be Allocated to the Rehabilitation of South New
Street)
* 9. Utility Committee Report - March 28, 2011
A. Evaluation of Proposals - Energy Management Agreement
(Committee Recommended that the City Manager be Authorized to Execute a Five (5)
Year Contract with an Annual Fee of $996,000, Plus Additional Services as Required,
with the Energy Authority, Inc. (TEA), as per the Terms of the Request for Proposal)
Page 3
Council Agenda - April 11, 2011 Page 3
* 10. Legislative, Finance, and Administration Committee Report - March 28, 2011
A. Review and Recommendation - Filling Critical Positions - Administrative Assistant
- Police Department
(Committee Recommended Approval of the Request to Recruit for the Administrative
Assistant to the Chief of Police)
B. FY 2012 Five-Year Capital Investment Plan (CIP)
(Committee Recommended Acceptance of the FY 2012 Five-Year Capital Investment
Plan (CIP) as Presented)
C. Review of Hospitality and Civic Function Policy
(Committee Recommended Approval of the Revisions to the Hospitality and Civic
Function Policy)
D. Reallocation of State Bond Funds
(Committee Recommended the Formation of a Committee (See Item #13) to Meet with
and Encourage State Legislators, the Bond Bill Committee, and the Governor to Ensure
that a Significant Portion of the $6M, Currently Authorized for the Construction of a
Civic Center, Be Specifically Allocated for an Economic Development Project Within
the City of Dover that Will Benefit Every Resident of the State of Delaware, Such as the
Construction of a Combined-cycle Natural Gas Generator At, or Infrastructure that
Will Be Necessary to, the Garrison Tract, and that this Allocation Be Accomplished in
this Legislative Year, Ending July 1, 2011, and that a Letter Be Sent in Response to
Related Correspondence Received from the Central Delaware Chamber of Commerce,
Dated March 2, 2011)
* 11. Safety Advisory and Transportation Committee Report - March 30, 2011
A. FY 2012 Five-Year Capital Investment Plan (CIP)
(Committee Recommended Acceptance of the FY 2012 Five-Year Capital Investment
Plan (CIP) as Presented)
B. Announcement of Public Workshop - Alternatives for the Clarence Street Extended
Project
(Committee Action Not Required)
* 12. Monthly Reports - February 2011
A. Budget Report
B. Chief of Police Report
C. City Assessor’s Report
D. City Manager’s Report
E. City Planner’s Report
F. Dover Fire Department Report
G. Capital Investment Plan (CIP) Report
* 13. Appointments Recommended by Council President Hogan - Ad-Hoc Committee to Meet
with State Legislators, the Bond Bill Committee, and the Governor Regarding the
Reallocation of State Bond Funds
A. David L. Bonar, Chair
B. Carleton E. Carey, Sr.
C. Anthony J. DePrima
D. Thomas J. Leary
E. William G. Neaton
Page 4
Council Agenda - April 11, 2011 Page 4
14. First Reading - Proposed Ordinance
The First Reading is offered on Proposed Ordinance #2011-10. Final action by Council
will take place during the Second Reading of the ordinance on April 25, 2011. Copies of
all proposed ordinances are available at the entrance of the Council Chambers or can be
obtained from the City Clerk's Office.
A. 2011 Budget Revision - Transfer to General Employee Pension Fund
15. Council Members Announcements
/tm
S:\AGENDAS & MINUTES\Council-Agendas\2011\04-11-2011.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 5
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on March 28, 2011 at 7:30 p.m. with Council President
Hogan presiding. Council members present were Mr. Bonar, Mr. Leary, Mr. McGiffin,
Dr. McGlumphy, Mr. Ruane, Mrs. Russell, Mr. Salters, and Mrs. Williams.
Council staff members present were Police Chief Hosfelt, Mrs. Mitchell, Mrs. Townshend,
Fire Chief Fortney, Mr. DePrima, City Solicitor Rodriguez, and Mrs. McDowell. Mayor Carey was
also present.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Hogan declared the Open Forum in session and reminded those present that
Council was not in official session and could not take formal action.
There was no one present wishing to speak during the Open Forum.
The invocation was given by Chaplain Dixon, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. McGiffin moved for approval of the agenda as presented, seconded by Mr. Bonar and
unanimously carried.
Mr. Bonar moved for approval of the consent agenda, seconded by Mr. Leary and carried by
a unanimous roll call vote.
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF MARCH 14, 2011
The Minutes of the Regular Council Meeting of March 14, 2011 were unanimously approved
by motion of Mr. Bonar, seconded by Mr. Leary, and bore the written approval of
Mayor Carey.
PRESENTATION - AWARDS BY DOWNTOWN DOVER PARTNERSHIP -
ST. PATRICK’S DAY PARADE
On behalf of the Downtown Dover Partnership, Mayor Carey presented awards for the 16th Annual
St. Patrick’s Day Parade, as follows:
Category Recipient
Pot O’ Gold - Anything with W heels Award Little Creek Fire Department
Rainbow Award - Car Clubs Only DelRods
Blarney Award - Best Mascot Delaware Tech - Terry Campus Hammerin’ Hawks
Drumline
Green Machine Award - Best Float Dover Interfaith Mission
Aran Award - Best Animal Cozy Corners 4-H
Harp Award - Best Musical Group Campus Community High School Drumline
Shamrock Award - Most Authentic Irish Theme W .T. Smithers
Leprechaun Award - Best Brigade/Marching Unit W est End Grade HY Steppers and Polytech
DE-931 st AFJROTC
McNamara Award - Best High School Marching Band Polytech High School
Mary Fitzpatrick Award (Best Overall) Delaware Tech - Terry Campus Hammerin’ Hawks
Drumline
Page 6
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 2
CERTIFICATE OF RECOGNITION - IRVING AND PHYLLIS LEVITT
The City Clerk read the following Certificate of Recognition into the record:
The Mayor and Council of the City of Dover take great pleasure in honoring Mrs. Phyllis Levitt and
Mr. Irving Levitt for their many years of service to the people of the City of Dover.
v For making public service a central part of their lives since arriving in the
City of Dover in 1966;
v For the professionalism and compassion with which they served others in
their careers with Dover High School and the Social Security Administration;
v For the dedication and commitment displayed by Mr. Levitt as he served as
a member of City Council, the City’s Utility Committee, and as President of
the Friends of the Dover Public Library;
v For enriching the lives of many in our community by promoting the arts in
Delaware, their tireless efforts on behalf of the Dover Art League, and their
innovative efforts in intercultural outreach for the arts; and
v For their passion for securing basic human rights for all individuals and
their outspoken advocacy for disadvantaged groups and individuals.
The Mayor and Council are pleased to recognize Mr. and Mrs. Levitt for these contributions and
for their lasting legacy of community service to the City of Dover.
Mayor Carey presented the Certificate of Recognition to Mr. Irving Levitt and Mrs. Phyllis Levitt.
Both Mr. and Mrs. Levitt relayed their appreciation to the City for the recognition.
FINAL READING - REZONING OF PROPERTY LOCATED AT 293 SAULSBURY ROAD,
OWNED BY F & B PROPERTIES
During their Regular Meeting of February 14, 2011, City Council held a public hearing to consider
the rezoning of property located at 293 Saulsbury Road, owned by F & B Properties, consisting of
3.64+/- acres. The property is currently zoned C-3 (Service Commercial) and subject to the
COZ-1 (Corridor Overlay Zone) and the proposed zoning is C-2A (Limited Central Commercial)
and subject to the COZ-1 (Corridor Overlay Zone). The subject property is located on the northeast
corner of the intersection of Saulsbury Road and North Street (Tax Parcel: ED05-076.11-01-43.00-000;
Fourth Council District; Planning Reference: Z-11-01). At this meeting, the motion for approval of the
rezoning request, as recommended by the Planning Commission, failed to obtain the affirmative vote
of a majority of the members elected to City Council, as required to pass a motion in accordance with
Article II, Section 10 of the City Charter. As a result, City Solicitor Rodriguez advised members to
reconsider the matter in order to obtain a majority vote on the request.
In response to City Solicitor Rodriguez, Mr. Bonar confirmed that, since he was absent during the
meeting of February 14, 2011, he listened to the audio recordings of the meeting, read the materials
provided and was prepared to vote at this time.
Page 7
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 3
After reviewing this matter, City Solicitor Rodriguez stated that, in essence, there has been no action
taken on the rezoning request. In accordance with Robert’s Rules of Order, he suggested that
members renew the motion, which did not receive five (5) affirmative votes, and if the motion to
renew passes, Council would reconsider the motion to approve the rezoning request. It was his
opinion that Mrs. Williams (who previously abstained) should be permitted to vote and Mr. Bonar
(who was previously absent) should be given the opportunity to vote.
Mr. McGiffin moved to renew the original motion that did not result in a final resolution,
seconded by Mr. Leary and unanimously carried.
Council President Hogan reminded members that the original motion made during the
Regular Council Meeting of February 14, 2011 was for approval of the rezoning request, as
recommended by the Planning Commission.
Mr. Salters relayed concerns that residents near the area proposed for rezoning have not been notified
and given the opportunity to voice their concerns. He suggested that the matter be referred back to
the Planning Commission and that they require additional notification to residents of the area.
Although he was not opposed to the rezoning, Mr. Salters relayed his objection to taking action
without giving the nearby residents the opportunity to express their opinions.
At the request of Council President Hogan, Mrs. Anne Marie Townshend, Director of Planning and
Community Development, advised members that the Dover Code requires that property owners
within 200’ of the property being considered for rezoning are notified. She assured members that
the property owners within this range were notified. It was her understanding that the concern was
that, although the property owners were notified, tenants of such properties are not required to be
notified by Code and were not contacted regarding this rezoning request.
Mrs. Russell stated her desire that the matter be referred back to the Planning Commission,
explaining that all residents should be notified of the proposed rezoning.
Mrs. Russell moved to refer the matter back to the Planning Commission, seconded by Mr. Salters.
Mrs. Townshend requested that, if Council refers the matter back to the Planning Commission,
members be specific in their motion regarding the notification (in terms of designating who should
be notified and at what distance from the property) since staff can not make a determination other
than what is required by the Dover Code.
Mr. Ruane moved to amend the motion to include notification (to be accomplished by the City) of
the residents of Lincoln Park and the Simon Circle Apartments. The motion was seconded by
Mrs. Russell.
At the request of Mr. Bonar, Mrs. Townshend read the notification requirements of the Dover Code,
Appendix B, Article 10, Section 5.13(a), as follows:
Page 8
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 4
“When there is a petition to rezone property in accordance with [sub]section 5.111,
all property owners within a distance of 200 feet shall be notified by regular mail of
the applications for rezoning. No fee shall be required for petitions filed in favor of
or against a pending application.”
Mrs. Townshend assured members that the notification requirements of the rezoning request were
met.
Mr. Bonar relayed concern that the motion to amend to expand the notification territory may be out
of order since the amendment would include Lincoln Park and Simon Circle, both of which reach
far beyond the 200’ requirement as specified in the Dover Code. It was his feeling that this would
require the City to notify the property owners/residents of several hundred dwellings in that
area which are far beyond the notification that is done for any other rezoning application in the City.
He requested a legal opinion regarding this matter. Responding, City Solicitor Rodriguez stated that
the motion provides for the City to go beyond what is required and that, if the motion passes by
Council, it would require additional notification in this particular case only.
Mr. Bonar questioned what would preclude requests for additional notifications in the future if the
City requires an amendment to the notification requirements for this rezoning request. It was his
concern that this would broaden an area of exposure for the City that is not necessary, noting that the
property owners were notified of the rezoning request as required by the Dover Code. He reiterated
his concern regarding the effect this may have on notifications for future rezoning requests.
Dr. McGlumphy recalled a similar situation when residents in the Schoolview area were not notified
of a project and stated that there were no notification changes made related to that issue. It was his
feeling that if such a change were to be made now, it would inundate the City with many problems,
and he reminded members that no further action was previously taken to address concerns relayed
by residents of Schoolview.
Mr. Leary suggested that members consider the position of the applicant. He explained that the City
establishes policies, procedures, ordinances, etc., for those wishing to do business in the City and,
when an individual follows these rules rigidly, it was his feeling that they have the right to expect
an outcome within a certain amount of time. He noted that the 200’ notification requirement was
established several years ago and has been followed since that time and he questioned why this
particular request would be treated differently.
It was Mr. Ruane’s opinion that the distinction relates to residents being notified, explaining that for
the Schoolview project, some residents were notified (as property owners); however, in this instance,
no residents were notified. He felt that the lack of notification represents a violation of the spirit and
intent of the law. He noted that the Dover Housing Authority was notified of the rezoning request;
however, no residents were notified. He suggested that members consider the spirit (intent) of the
law and allow for notification to some of the residents. It was his feeling that, in this situation, the
law has failed the City and that this situation represents an exception. He suggested that this matter
would only be an issue in the future if there is another instance when no residents are provided
notification of an application.
Page 9
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 5
In response to Mr. Salters, Council President Hogan indicated that an ordinance amendment that
would extend the 200’ notification requirement to 400’ would not resolve the current issue,
explaining that it would be necessary to include notification to “residents” in addition to property
owners as is currently required.
In regards to the Schoolview situation, Mr. Ruane reminded members that notification was provided,
and several community meetings, led by Mr. McGinnis, were held with the residents of Schoolview;
therefore, he felt that the cases were not comparable. He requested that, if an ordinance amendment
is proposed, applicants be required to provide due diligence in a neighborhood to get the support of
the community when a project is proposed.
Mr. Bonar stated that this issue has been a topic of extensive news media coverage during the past
month in both the Delaware State News and the Dover Post, which is provided free to every resident.
It was his observation that there were no residents in attendance to voice any opinion regarding this
matter that would indicate that anyone feels disenfranchised; therefore, it was his feeling that the
motion to reconsider should be accomplished at this time.
On a call for the question by Mr. Bonar, the motion for the City to notify all residents in
Lincoln Park and Simon Circle of the potential rezoning failed by a roll call vote of five (5) no
and four (4) yes (Mrs. Russell, Mr. McGiffin, Mr. Salters, and Mr. Ruane).
The motion to refer the rezoning request back to the Planning Commission failed by a roll call
vote of six (6) no and three (3) yes (Mrs. Russell, Mr. Salters, and Mr. Ruane).
At the request of Council President Hogan, prior to the reconsideration of the original motion to
approve the rezoning request, as recommended by the Planning Commission, Mrs. Townshend
briefed members on the petition to amend the zoning district and the findings and recommendations
of the Planning Commission.
In response to Mr. Ruane regarding the completion of a traffic impact study, Mrs. Townshend stated
that a “scoping” meeting was held with the Delaware Division of Transportation (DelDOT) and the
scope was developed and data gathered. She noted that the applicant was present and could give
further details. It was her understanding that DelDOT, rather than the developer, will be performing
the impact study.
There being no objections, the applicant was authorized to address members.
Mr. John Paradee, Attorney with Prickett, Jones, and Elliott, 11 N. State Street (legal counsel for the
applicant, F & B Enterprises) introduced Mr. Jeffrey Bross, Project Engineer, Duffield Associates,
5400 Limestone Road, Wilmington. Mr. Bross confirmed that the status of the impact study, as
described by Mrs. Townshend, is correct. He stated that the final traffic study should be completed
within the next two (2) to three (3) months; however, review by DelDOT could take an additional
three (3) to four (4) months.
Page 10
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 6
Responding to Mr. Ruane, Mr. Bross stated that although the tenant, Royal Farms, has conducted
market studies, there will be major highway improvements at this intersection and DelDOT has
already conducted extensive study to determine what will be done at this intersection based on traffic
projections which consider the proposed use. He stated his belief that the applicant will be
responsible for constructing some of the initial improvements, in concert with DelDOT, to provide
some traffic relief at the intersection. Mr. Bross stated that, although a considerable amount of study
has been accomplished, DelDOT is requiring additional study. He confirmed that there will be an
increase in traffic movement and stated his understanding that most of the traffic that would be
stopping at the facility already utilizes the roadway. However, he explained that improvements will
be made to turn lanes to make sure that the traffic entering and exiting the facility does not impact
through traffic. Without the full traffic study, he stated that it is difficult to provide additional
details.
It was Mr. Paradee’s opinion that Mr. Ruane’s questions relate to site plan issues that will be
addressed in the future. He noted, respectfully, that the public record has been closed and questioned
if the line of questioning was appropriate. Mr. Paradee reiterated that the traffic impact study is
currently underway and that the applicant will be required to incorporate the recommendations of
DelDOT into the site plan.
In response to Mr. Salters, Mrs. Townshend stated that the traffic impact study would not prohibit
a facility from locating to a particular site. She explained that the study determines the
improvements that are necessary to the roadway system surrounding the project, which could include
intersection and signal improvements, expansion of roadways, etc. Mrs. Townshend noted that such
improvements could be costly and are required of the developer. Elaborating, Council President
Hogan stated that it is conceivable that there may be so many improvements required that it no
longer becomes a viable and profitable project.
Mrs. Williams called for the question, seconded by Dr. McGlumphy and carried by a roll call
vote of six (6) yes and three (3) no (Mrs. Russell, Mr. Salters, and Mr. Ruane).
Council President Hogan reminded members that they will be voting on Ordinance#2010-31, which
would rezone the property at 293 Saulsbury Road to C-2A (Limited Central Commercial) and subject
to the COZ-1 (Corridor Overlay). (The First Reading of this Ordinance was accomplished during
the Council Meeting of December 13, 2010.)
The motion for approval of the rezoning request, as recommended by the Planning
Commission was carried by a roll call vote of six (6) yes and three (3) no (Mrs. Russell,
Mr. Salters, and Mr. Ruane) and Council adopted Ordinance #2010-31, as follows:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 293 SAULSBURY ROAD
Page 11
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 7
WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property within
the limits of the City of Dover; and
WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use of
property described below from C-3 (Service Commercial Zone) and subject to COZ-1
(Corridor Overlay Zone) to C-2A (Limited Central Commercial Zone) and subject to COZ-1
(Corridor Overlay Zone).
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
DOVER, IN COUNCIL MET:
1. That from and after the passage and approval of this ordinance the Zoning Map and Zoning
Ordinance of the City of Dover have been amended by changing the zoning designation from
C-3 (Service Commercial Zone) and subject to COZ-1 (Corridor Overlay Zone) to C-2A
(Limited Central Commercial Zone) and subject to COZ-1 (Corridor Overlay Zone) on that
property located at 293 Saulsbury Road (on the northeast corner of the intersection of
Saulsbury Road and North Street), consisting of 3.64+/- acres (157,558 sq. ft.), owned by
F & B Properties.
ADOPTED: MARCH 28, 2011
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE REPORT -
MARCH 14, 2011
The Parks, Recreation, and Community Enhancement Committee met on March 14, 2011 with
Chairwoman Russell presiding.
Review of Applications - Youth Advisory Committee - One (1) Year Terms to Expire
January 24, 2012
In accordance with Resolution No. 2008-11, adopted by City Council on June 23, 2008, nine (9)
members are to be appointed annually to serve on the Youth Advisory Committee. It was noted that
nine (9) applications were received and that there are nine (9) vacancies. Mrs. Russell recommended
that all nine (9) applicants be appointed to serve on the Youth Advisory Committee.
The committee recommended that Mr. Kenneth Anderson, Mr. Seadric Corbitt, Ms. Kristen Dietz,
Ms. Chidinma Emenike, Mr. Dennis Hallock II, Ms. Karly Jones, Ms. Sonya Modi,
Ms. Valeria Provotorova, and Ms. Rachel Voak be appointed to serve on the Youth Advisory
Committee.
Mr. Anthony DePrima, City Manager, stated staff’s desire for the City’s Teen Librarian to play a
greater role in the Youth Advisory Committee, since this librarian specializes in working with this
age group and could assist members on programming, etc. He suggested that future Committee
meetings be held at the library.
Page 12
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 8
Mrs. Russell stated that although she had no objections to the Teen Librarian becoming involved
with the Youth Advisory Committee, she felt that there should be no changes in the current City staff
who are involved with the Committee. Responding, Mr. DePrima stated that it was never intended
for the Public Affairs Coordinator to be involved; however, Ms. Sherwanda Rachal-Speaks,
Recreation Specialist, would continue to participate in the Committee.
With regard to the appointments, Mrs. Russell stated that the applicants will be sworn in once the
appointments are approved by City Council.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation that
Mr. Kenneth Anderson, Mr. Seadric Corbitt, Ms. Kristen Dietz, Ms. Chidinma Emenike,
Mr. Dennis Hallock II, Ms. Karly Jones, Ms. Sonya Modi, Ms. Valeria Provotorova, and
Ms. Rachel Voak be appointed to serve on the Youth Advisory Committee. The motion was
seconded by Mr. Leary and carried by a unanimous roll call vote.
Benchmarks Established for the Economic Development Office
Members were provided the Major Programs and Strategic Objectives for the Economic
Development Office. Mr. William Neaton, Economic Development Director and Director of the
Downtown Dover Partnership, reviewed the Strategic Objectives, including benchmarks, for
Fiscal Year 2010-2011.
In reviewing Item #1 of the Strategic Objectives, Complete a Site Development Master Plan for the
Garrison Tract, Mr. Neaton stated that he has been working with a marketing company to develop
a professional marketing plan. He noted that the plan is more extensive than he had anticipated
and stated that he met with the Secretary of the Delaware Economic Development Office (DEDO)
to solicit DEDO’s assistance. As a result, Mr. Jeff Stone, Director of Infrastructure
and Intergovernmental Relations, DEDO, has been assigned to assist Mr. Neaton with this endeavor.
He advised members that several subsequent meetings have been held to discuss developing
marketing and business plans for the Garrison Tract.
At the request of Dr. McGlumphy, Mr. Neaton stated that he would provide members with the
Economic Development Market Packet that he shared with members last fall.
Mr. Neaton advised members that he has received commitments from Macquarie Energy, LLC and
DEDO to assist him with the Comprehensive Economic Development Strategy (CEDS) Application
process for the infrastructure development of the Garrison Tract. He noted that the a quote from the
Becker Morgan Group included an estimated a fee in the amount of $8,000 for infrastructure costs
at the Garrison Tract; however, it has since been determined that this information could be obtained
free of charge from EDiS, and the City should be in receipt of this information soon.
Responding to Mr. Ruane, Mr. Neaton stated that no funds have been set aside for marketing for the
Garrison Tract. Elaborating, Mr. Anthony DePrima, City Manager, stated that staff has been
considering creating a separate accounting fund for the Garrison Tract and making this project an
independent line item so that income and expenses can be tracked.
Page 13
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 9
Mr. Neaton advised members that Macquarie Energy, LLC, a second potential tenant for the
Garrison Tract, will visit Dover this week and was scheduled to meet with the Department of Natural
Resources and Environmental Control (DNREC) this morning. He stated that
Macquarie Energy, LLC experienced difficulty obtaining the 80 air credits (Emission Reduction
Credits) required by DNREC and hoped that this had been resolved. Mr. Neaton noted that the
City of Dover has been instrumental in developing possible solutions to obtaining the required air
credits and is scheduled to meet with Mr. David Small, Deputy Secretary of DNREC, on
March 15, 2011 at 2:30 p.m. to discuss the matter.
In response to Mrs. Russell, Mr. DePrima stated that, although Macquarie Energy, LLC will not be
responsible for property taxes on the land, which is leased from the City, the contract requires the
solar park to pay tax on equipment such as iron stanchions and wiring. Although taxes will be paid
to the City, he stated that the actual solar panels are not taxable.
After much discussion, Dr. McGlumphy suggested that, although specific details regarding the
Sun Park were submitted previously to the Utility Committee and City Council, it would be
beneficial for staff to make a presentation to the Committee. Mr. Neaton also invited members to
contact him should they wish to tour the facility.
Mr. Clay Hammond, Chairman of the Delmarva Black Chamber of Commerce and Vice-President
of Business Development, questioned if there has been any discussion regarding minority
participation in this project with regard to the purchase of solar panels. Responding, Mr. DePrima
stated that the City’s involvement extends only to the land lease. He noted that, since the project is
strictly private and involves only private investment, there was no discussion regarding minority
participation as there was with the new Dover Public Library project.
Mr. Bobby Wilson, 1561 Nathaniel Mitchell Road, stated his opinion that minority participation
should be considered whenever the City is engaged in a project, since tax dollars come from the
minority community as well. Responding, Mr. Ruane noted that Mr. Neaton was successful in
allowing for the consideration of local companies for any improvements and/or purchases.
In the future, Mr. Hammond suggested that language be included in such contracts to encourage
minority preference and stated that local preference differs from minority preference.
Mr. DePrima explained that this project involves the installation of 100 acres of solar panels and that
few companies globally have the capability of producing the equipment required.
Regardless, Mr. Wilson reiterated his feeling that if language regarding minority preference had been
included in the contract, the company would have given this matter consideration.
Referring to Item #2, Promote City-Wide Economic Development Initiatives, Mr. Neaton stated that
he has attended monthly meetings of the Kent Economic Partnership for the past six (6) months and
will continue to do so. In addition, he advised members that he has been working with a logistics
company that has indicated possible interest in locating to the Kent County Aero Park. He noted that
a Wilmington-based company, The Commonwealth Group, and the State Police are current
occupants.
Page 14
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 10
Mr. Neaton reminded members that the Job Growth Report was provided to members during their
meeting of February 14, 2011; therefore, this goal has been accomplished. He stated that a table
listing vacant buildings has been created and will continue to be updated by staff. In response to
previous comments made by Dr. McGlumphy, Mr. Neaton stated that staff is in the process of
identifying all of the vacant properties located on Route 13. At the request of Mrs. Russell,
Mr. Neaton stated that the number of years a building has remained vacant could be included on the
list.
With regard to vacant buildings, Mr. Ruane suggested the possibility of the City creating more
stringent mandates by amending the existing ordinance.
Mr. Neaton stated that he has been developing a list of renewable energy manufacturers and higher
education renewable energy researchers and bringing them together with state officials and that this
is an ongoing project. He stated that meetings have been held and will continue.
Referring to Item #3, Advance Initiatives of the Downtown Dover Partnership (DDP), Mr. Neaton
stated that Mr. DePrima is the Chairperson of the Recruitment Subcommittee of the DDP Economic
Development Committee and that a recruitment strategy has been developed to attract new
businesses to downtown. He reiterated that a marketing brochure, including a vacant property list,
has been completed and is available in the DDP packet which is readily available from his office.
Mr. Neaton stated that the asbestos cleanup at 22-24 West Loockerman Street has been completed
and staff is currently in the process of obtaining estimates for renovating the interior. Staff has been
meeting with property owners individually, as previously suggested by Mr. Ruane. Mr. Neaton also
stated that he has a conference call scheduled with the owners of the property located on the
corner of Governors Avenue and Loockerman Street, which has been vacant for a long period of
time. It is his understanding that the owners will be moving forward with establishing a business
at this location.
Mrs. Russell relayed her concern that many businesses in the area remain open for only a short
period of time. It was also her feeling that much effort is directed toward those properties located
in the 100 block of Loockerman Street and suggested that staff give this same consideration to the
200 block, where more minority businesses are located. Responding, Mr. Neaton stated that a
merchant meeting is held monthly and that all merchants along Loockerman Street are invited and
encouraged to attend. In addition, he stated that a matching fund facade program is open to all
merchants.
Mr. Neaton reminded members that the charrette for the downtown area has been completed and was
endorsed by City Council during their meeting of February 14, 2011. With regard to the
Memorandum of Agreement between the DDP and Delaware Department of Transportation
(DelDOT) for the development of a public/private partnership for the Transit Center and recruitment
of a private partner for the P3 Agreement to construct the Transit Center Building, Mr. Neaton noted
that these goals are no longer germane and will not be completed. He explained that DelDOT has
selected three (3) companies (EDiS, Buccini/Pollin Group, and Hunt Contracting) and will be
sending each a Request for Proposal (RFP) for the development of the Transit Center. He stated that
Page 15
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 11
it is expected that the review of the RFPs will occur this summer and the contract will be awarded
in September 2011. Mr. Neaton noted that after review and approval by the City, it is hoped that
construction will begin after the first of the year (2012) and will consist of a 30,000 square foot
building proposed to house the Kent County Metropolitan Planning Organization (MPO), E-Z Pass
Delaware, and several other transit operations.
Responding to Mr. Hammond, Mr. Neaton indicated that the City will not be the owner of the
facility; it is anticipated that the builder will be the owner.
In response to Mr. Ruane, Mr. Neaton confirmed that the first floor of the facility will be dedicated
to the Transit Center and will include restrooms for patrons. The second and third floors will be
offices. He also confirmed that Greyhound remains a potential partner.
Mr. Wilson questioned if there will be a requirement established that general contractors must
provide for minority participation prior to the distribution of the RFPs. Responding, Mr. Neaton
stated that the RFPs will be handled by DelDOT and the City has no control over this issue.
Update - Planning and Funding for New Library
Ms. Margery Cyr, Library Director, advised members that EDiS located their construction site trailer
onto the new library site on March 7, 2011 and began running power to the trailer on
March 14, 2011. In addition, the City has begun relocating trees and shrubs on the site from
Loockerman Street to other areas throughout the City. She also stated that the pavement work for
the access road along the Department of Natural Resources and Environmental Control (DNREC)
property line will begin soon and explained that this roadway is vitally important since it will be used
to bring construction vehicles to the site. Mr. Scott Koenig, Public Services Manager/Director of
Public Works, confirmed that the pavement work is scheduled for Thursday, March 17, 2011 and
Friday, March 18, 2011.
Mr. Zachery Carter, Parks and Recreation Director, advised members that staff will meet with City
employees on March 17, 2011 and March 18, 2011 to provide information regarding the work the
effects it will have on parking and building access. He assured members that neighboring property
owners will be made aware of this information as well.
Ms. Cyr stated that a groundbreaking ceremony is scheduled to be held on either April 5, 2011 or
April 6, 2011, pending confirmation from the Governor’s Office. She also apprised members that
two (2) fundraising events have been scheduled for the new Dover Library building project, as
follows: 1) Saturday, March 19, 2011 at the Dover Newsstand at 5:30 p.m.; and 2) Friday,
March 25, 2011 at the Golden Fleece Tavern at 5:30 p.m.
FY 2012 Five-Year Capital Investment Plan (CIP)
Mr. Zachery Carter, Parks and Recreation Director, reviewed the draft Capital Investment Plan for
the Parks and Recreation Department for Fiscal Years 2012-2016.
Responding to Mr. Ruane, Mr. Carter explained that the paving of parking lots at Schutte Park was
moved to Fiscal Year 2015 because a portion of the site will be occupied in the future by the Boys
and Girls Club and the specific location is not known. In addition, he stated that a skate park is
Page 16
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 12
planned for a portion of the property. As a result, staff felt that the City should not develop the land
until the details of these projects are known. Mr. Carter explained that there would be no benefit for
the City to seed the property because it would be time to begin construction on other projects by the
time the grass matured for use as a soccer field.
Elaborating, Mr. Anthony DePrima, City Manager, stated that the Master Plan for Schutte Park will
provide a better understanding of the proposed uses of the property.
In response to Mr. Ruane, Mr. Scott Koenig, Public Services Manager/Director of Public Works,
confirmed that the realignment of Wyoming Mill Road will include the removal of all road surfaces.
He explained that the old road bed will be milled out, dug down, and covered with topsoil to provide
some type of positive drainage and that ponds are not proposed for this area. Mr. Koenig noted that
there appear to be funds in the project budget to extend the path along Hazlettville Road to the
intersection of Westover Drive, which was not originally included; however, federal
American Recovery and Reinvestment Act (ARRA) funds will be used for the project. He indicated
his understanding that any funds remaining at the end of the project will be returned to the
federal government; therefore, the City intends to put any cost savings into additional improvements.
Mr. Koenig noted that the 10-foot wide sidewalk would be extended to the intersection and the old
road bed would be seeded.
Mr. Ruane relayed his concerns regarding the out years of the Plan and requested specific details
regarding when and if the Boys and Girls Club will relocate to Schutte Park. He questioned how
long the City plans to hold the property in abeyance waiting for construction to begin on the
Boys and Girls Club. It was his feeling that the property should not remain in perpetuity for the
Boys and Girls Club when there is a need for other uses, such as a soccer field. Responding,
Mr. DePrima suggested that this matter be further discussed when the Master Plan for Schutte Park
is presented to members for their review, which is planned for next month.
Mr. Ruane suggested that staff present City Council with a more aggressive and timely plan for
Schutte Park, feeling that some projects, such as tennis courts planned for Fiscal Year 2014, should
be moved forward.
For the record, Mr. Ruane noted that the $195,000 included for the Lighted Soccer/Multi-Purpose
Field and the $160,000 included for the Tennis Courts at Schutte Park (totaling $355,000) would
equate to a one-cent (1¢) property tax increase.
Referring to the Dover Interfaith Mission located on Forrest Street, Mrs. Russell requested staff to
consider the placement of stakes to allow for residents to play horseshoes.
Mr. Clay Hammond, Chairman of the Delmarva Black Chamber of Commerce and Vice-President
of Business Development, noted that there have been several articles in local newspapers addressing
how the quality of life can be improved for the African American community. As a result,
recreational offerings have been identified to provide such improvement. He explained that many
individuals in the community cannot afford recreational offerings in the City. He proposed that the
Page 17
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 13
City hold a carnival, similar to one held in Middletown, and that a percentage of the proceeds be
dedicated to scholarships for disadvantaged children to attend recreational programs. He requested
the opportunity to meet with staff and members of the Committee to discuss this concept and invited
everyone to attend the carnival held in Middletown.
Responding, Mrs. Russell suggested the involvement of the Youth Advisory Committee.
Mr. Hammond questioned the amount of participation at the Pitts Center during the summer months.
Responding, Mr. Carter stated that participation is substantial; however, not as great as during the
winter months. Mr. Hammond felt that the reason for the lack of participation is due to the facility’s
lack of air conditioning. Mr. DePrima stated that, although air conditioning was removed from the
project to provide cost savings, it has been discovered that it is uncommon to have air conditioning
in gyms.
The Committee recommended that the Lighted Soccer/Multi Purpose Field and Tennis Courts at
Schutte Park Projects be moved from Fiscal Year 2014 to at least Fiscal Year 2013 in the Capital
Investment Plan (CIP).
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
UPDATES
The following updates were provided to members:
Housing and Recovery Act of 2008 Funds (Neighborhood Stabilization Fund)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed the
Update on the Housing and Recovery Act of 2008 Funds (Neighborhood Stabilization Program).
Referring to the NSP Properties, Mr. Ruane relayed concerns that the sale price of these properties
will skew the comparable sale prices in the area and affect the appraisal of property. He suggested
that the property records include a note indicating that the property was a neighborhood stabilization
house.
Puncheon Run Watershed Action Team and Flood Plain Mapping Update
Mr. Scott Koenig, Public Services Manager/Director of Public Works, advised members that a
Community Workshop will be held on Tuesday, March 22, 2011 at 6:00 p.m. at City Hall to review
the improvements made by the Delaware Department of Transportation (DelDOT) and the
Kent Conservation District, and to discuss a resident’s recent success in obtaining a Letter of Map
Amendment (LOMA) and identify other property owners who might be successful in pursuing this
option. He stated that an electronic notice was distributed, and hand-delivered notices and mailings
will also be distributed.
Mr. Anthony DePrima, City Manager, suggested that an effort be made to invite the engineer or
surveyor who did the work that benefitted the successful resident so that he could explain the
process. Responding, Mr. Ruane stated that he would attempt to contact him and request his
presence.
Page 18
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 14
CDBG Program
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reported the Status
of FY 2009-2010 CDBG Projects.
Referring to the Committee meeting scheduled for March 24, 2011, Mr. Ruane questioned if
members should consider grant applications at this time since the CDBG funding to the City may
not be allocated by the federal government. He suggested that staff look into this matter and advise
members if the scheduled meeting is necessary. (Clerk’s Office Note: Per an email from
Mrs. Ann Marie Townshend which was forwarded to members by the Clerk’s Office on
March 15, 2011 (Attachment #1 to Committee minutes), CDBG funds will not be allocated until
Congress passes the federal budget. The City’s HUD representative recommended using the
FY 2009 allocation to develop the City’s Action Plan, which must be submitted to HUD by mid-May.
For this reason, the meeting proposed for March 24, 2011 will take place as scheduled.)
By consent agenda, Mr. Bonar moved for acceptance of the Parks, Recreation, and Community
Enhancement Committee Report. The motion was seconded by Mr. Leary and carried by a
unanimous roll call vote.
UTILITY COMMITTEE REPORT - MARCH 14, 2011
The Utility Committee met on March 14, 2011 with Chairman Ruane presiding.
Authorization to Conduct Financial Analysis of West Deptford Generation Station
Mr. Ron Lunt, Public Utilities Director, reminded members that since May 2007, the Dover 2030
Energy Plan Committee has been meeting periodically to review the PJM Market, evaluate the
capacity/energy requirements of the City’s system, and identify action plans to address future energy
needs. After extensive discussion on the market and capacity/energy shortfall, it was decided in
2008, to solicit the energy development market to gain knowledge of what options are available to
the City through a Request for Qualifications (RFQ) process. He explained that the goal was to gain
information and knowledge from potential developers and identify possible solutions to the
City’s requirements. In March of 2009, staff completed Phase II of the project, which was the
evaluation of the proposals and the selection of options for which to enter negotiations. Dover Sun
Park and Garrison Energy Center Land Lease/Gas Turbine Combined Cycle (GTCC) were the first
two (2) agreements to be executed through this process.
Mr. Lunt advised members that the final option available under the RFQ process and the proposal
under consideration is a Purchase Power Agreement (PPA) for a GTCC plant located in West
Deptford, New Jersey. He explained that the proposed West Deptford Generation Station would be
a state-of-the-art GTCC generator offering an extremely efficient and environmentally prudent
technology. The basis of the PPA would be that the City would secure 25 Mw of capacity from the
646 Mw Station. He explained that the City would receive a guaranteed heat rate (this is an
efficiency measurement for the conversion of natural gas to electric energy) and the City would pay
a prorated portion of the operating expenses. He noted that fuel costs are not included in the PPA,
as these would be prorated and passed on to all users at the market rate. The energy purchased from
the Station would further diversify the City’s current energy portfolio by adding an efficient fixed
asset and would displace future market-based energy hedges.
Page 19
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 15
Mr. Lunt reviewed the highlights of the proposed PACE Global analysis, as follows:
1. The first task would be to analyze the proposal for fatal flaws, which would
include a high-level view of the economics; review of the proposed terms;
comparing terms to historic energy and capacity markets; and projecting power
supply curves. If no deficiencies are discovered, Staff would direct PACE to
proceed to the next task.
2. The next task would be to develop a detailed economic model; forecast future
power pricing, potential changes and drivers for possible changes; develop
market and technology trends, including the projected plant utilization/dispatch
expectations; and identify possible negotiation points. If it appears that the
economics of the plant are favorable, staff would direct PACE to proceed to the
next step.
3. The final task would be to negotiate the final terms and conditions for the PPA
and, if the financial benefits appear to be favorable, staff would present this
proposal to City Council for consideration. $15,000 has been budgeted for this
phase of the project.
Staff recommended that PACE Global be authorized to proceed with the financial analysis of the
West Deptford Generation Station at a cost not to exceed $80,000 and that this project be funded by
transferring $80,000 from the Engineering Operating Budget (480-8300-563-30-31) - Contractual
Services to the Administration Operating Budget (480-8400-564-30-29) - Consulting Fees.
Responding to Mr. Ruane, Mr. Lunt stated that, although this project would further insulate the City
from price volatility, the City would remain subject to the natural gas volatility. Should the capacity
market be reduced or eliminated in the future, the City would be subject to paying some capacity
payments. If this were to occur, there would be a switch on the energy side, since generators will
recover their costs either in a two (2) phase market of capacity and energy or a combined market of
energy and capacity. Mr. Lunt indicated that he would then expect power prices to increase in the
future to compensate for losses in capacity payments.
At the request of Mr. Ruane, Mr. Lunt briefly reviewed a Presentation - City of Dover (Dover) West
Deptford Opportunity Analysis, dated February 24, 2011.
Mr. Snaman questioned the amount of energy that the solar plant and natural gas plant will provide
to the City’s annual production. Responding, Mr. Lunt noted that the solar plant will provide less
than 2% of the City’s energy and explained that it would be difficult to compare this to an annual
load due to scheduling. He stated that he did not expect the gas plant to be cheaper than the nuclear
portion of the grid and anticipated a 60% to 70% dispatch schedule for the gas plant, whereas the
City’s current plants are less than 2%.
In response to Mr. Ruane, Mr. Lunt confirmed that the analysis will determine if the expectations
reported are true and valid and provide a projection of what the future market may be for energy
costs. This will assist in determining whether or not the City should enter into a PPA with the
Station.
Page 20
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 16
The Committee recommended approval of staff’s recommendation to authorize PACE Global to
proceed with the financial analysis of the West Deptford Generation Station at a cost not to exceed
$80,000, and that this project be funded by transferring $80,000 from the Engineering Operating
Budget (480-8300-563-30-31) - Contractual Services to the Administration Operating Budget
(480-8400-564-30-29) - Consulting Fees.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
Power Plant FY 2012 Capital Investment Plan (CIP) Review (Deferred by Committee on
February 28, 2011 Due to Time Constraints)
Mr. Vince Scire, Plant Manager at McKee Run and VanSant Generating Stations with
NAES Corporation, reviewed the draft Capital Investment Plan (CIP) for the Power Plant for Fiscal
Years 2012-2016 and explained the need for the additional projects (as highlighted).
In response to Mr. Ruane, Mrs. Donna Mitchell, Controller/Treasurer, confirmed that she has been
working on a cost of service revision that will result in amendments to capital needs. She stated that
funding to cover the CIP remains consistent. Mrs. Mitchell noted that staff has allocated
approximately $800,000 for the future capacity reserve for the VanSant capacity and that funds have
been designated in Fiscal Years 2015 and 2016 from the depreciation reserve to help cover costs.
She assured members that funding from the operating fund has remained consistent with last year.
Mrs. Mitchell stated that the CIP will have no effect on the City’s electric rate for the next five (5)
years.
The Committee recommended approval of the Power Plant FY 2012 Capital Investment Plan (CIP),
as presented by staff.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
2012-2016 Utility Capital Investment Plan (CIP) (Deferred by Committee on February 28, 2011
Due to Time Constraints)
Mr. Ron Lunt, Public Utilities Director, reviewed the 2012-2016 Utility Capital Investment Plan
(CIP) and explained the need for the additional projects (as highlighted).
Mr. Ruane noted that the FY 2011 CIP included the Walker Road Overhead Conversion Project;
however, it is not included in the current CIP. Responding, Mr. Lunt reminded members that at the
beginning of FY 2011, the project was removed from consideration and some of the funds were
allocated to order transmission switches that were failing on North Street. He stated that the
Walker Road Overhead Conversion Project was coordinated with the Water System Upgrade, which
was determined to be too expensive and was postponed indefinitely. From an electric standpoint,
he stated that it was staff’s opinion that it would not be feasible to complete the project without
addressing the water system upgrade concurrently.
Page 21
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 17
In response to Mr. Ruane, Mr. Lunt indicated that overhead conversion projects (included under
“distribution upgrades”) are continuing throughout other parts of the City, including Huntley Circle
and Autumn Woods Apartments located off Webbs Lane. He stated that staff is in the process of
analyzing outages for the past calendar year, which will assist in prioritizing developments and areas
for this project. He stated that, although the Crossgates area has been completed, including the
removal of overhead lines, work continues in the South State Street Extended area (Old Mill Road,
Fairfield Drive, Candlewick Drive, etc.).
The Committee recommended approval of the 2012-2016 Electric Engineering and Transmission
and Distribution Capital Investment Plan (CIP), as presented by staff.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
Mr. Lunt reported that there were no changes to the 2012-2016 Water/Wastewater CIP, as submitted
to members previously. He noted that some projects will be carried forward from the current fiscal
year, due to funding or scheduling issues; however, these projects will be funded from the current
source of funds.
In response to Mr. Ruane, Mr. Lunt stated that staff is attempting to mobilize the contractor to
complete the inflow/infiltration (I & I) projects that were identified approximately four (4) years ago,
for which funding is in place. He explained that staff is regrouping the I & I priority list by
conducting an analysis of those pump stations that have higher rates during wet weather. Staff has
been conducting “smoke” testing and an extensive amount of camera investigation on existing
infrastructure in areas suspected of problems. Mr. Lunt noted that completion of the “smoke” testing
would be necessary before staff can firmly identify the next area for this project.
Responding to Mr. Ruane regarding water quality improvements, Mr. Lunt stated that funding for
Bayard Avenue is included in the current year’s budget and work will begin once the area in front of
City Hall is completed (within a week or so). A pre-bid meeting was held last week for the Route 13
Southbound Water Project and funding is included in the current year’s budget. He advised
members that staff is delaying the project located east of North State Street in case the bids for the
Route 13 Southbound Water Project come in over budget.
At the request of Mr. Ruane, Mrs. Donna Mitchell, Controller/Treasurer, stated that she has not
completed an analysis of the water/wastewater funds; however, she stated that since the City opted
to use State revolving loan funds rather than issuing a bond, no interest is paid until the money is
drawn. Therefore, she stated there will be a change in the forecast model (bonds versus state loans).
She is revisiting the rates since the City will not incur the debt service as originally anticipated. As
a result, she stated that she expects to see some changes in future rates (on the down side) from those
included in the model last year.
In response to Mr. McGiffin, Mrs. Mitchell explained that the forecast currently indicates a rate
increase every year to cover debt service, which may not be necessary since the City is not incurring
the debt service that was originally anticipated.
Page 22
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 18
The Committee recommended approval of the 2012-2016 Wastewater and Water Management
Capital Investment Plan (CIP), as presented by staff.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
PACE/NAES Monthly Report (December) (Deferred by Committee on February 28, 2011 Due
to Time Constraints)
The PACE/NAES Monthly Report for December 2010 was provided to members to enable them to
monitor electric sales and revenues received, which will provide a better understanding of any
fluctuations that occur and allow the opportunity to make improvements if deemed necessary.
In response to Mr. Ruane regarding the new Solar Plant, Mr. Lunt referred to Page 5 of the report
and confirmed that the cost of solar energy has been built into the City’s Power Year projections and
costs over time. Mrs. Mitchell, Controller/Treasurer, explained that the cost of the power supply
itself has decreased; therefore, the incremental cost of solar energy is not evident since it is more
than offset by the reduction in power supply.
The Committee recommended acceptance of the PACE/NAES Monthly Report for December 2010.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
By consent agenda, Mr. Bonar moved for acceptance of the Utility Committee Report,
seconded by Mr. Leary and carried by a unanimous roll call vote.
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
MARCH 14, 2011
The Legislative, Finance, and Administration Committee met on March 14, 2011 with
Chairman Leary presiding.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of a Hiring Freeze for
Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review and approval
of the Legislative, Finance, and Administration Committee and City Council. It was suggested that
there be a “standing” agenda item to consider the filling of critical positions and, if there were no
positions to consider, the item could be removed.
Mr. Leary noted that there were no critical positions to be considered; therefore, no further action
was required.
Milliman Actuarial Analysis Updates: Overview of Pension and OPEB (Other Post
Employment Benefits) Liability for Fiscal Year 2010/11 and Actuarial Pension for Fiscal Year
2010/11 and OPEB Benefit Rates for Fiscal Year 2011/12 Budget
Mrs. Donna Mitchell, Controller/Treasurer, stated that the actuarial analysis presentation to be
reviewed by Mr. Scott Porter, Principal, Consulting Actuary, Milliman, Inc., would provide a
summary of the analysis, an overview of the steps taken thus far, and recommendations.
Page 23
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 19
Mr. Porter reviewed a Presentation - Pension and Other Post Employment Benefits, Actuarial
Valuation Updates for Fiscal Year Ending June 30, 2011. He stated that actuarial valuations were
performed for the City’s Civilian and Police Pension Plans, as well as the Other Post Employment
Benefits (OPEB) Plan. He explained that an actuarial valuation is a “snapshot” of the assets and
liabilities of each plan as of June 30, 2010. Based on participant information, the actuarial valuation
projects the benefits which would be received, using assumptions regarding when employees are
expected to terminate or retire, how long they are expected to collect benefits, etc., and then
discounts them all back at specific interest rates to determine the liability. Mr. Porter indicated that
this information is then compared to the assets of the plan to determine the funded status.
Mr. Porter advised members that there are four (4) purposes for performing the actuarial valuation:
1) to determine the funded status of the plan;
2) to review the experience of the plan during the prior year;
3) to provide information for financial statements for the City of Dover; and
4) to determine the City’s contributions to ensure that the plans are being
adequately funded in a uniform manner.
Mr. Porter stated that all actuarial assumptions used to determine the liability of the plan are
reviewed in the process of determining the funded status of the plan, and changes are made
accordingly. Such changes may include lowering the assumptions used for investment return and
salary increases.
Referring to Page 9 of the Presentation, Mrs. Mitchell reminded members of the positive steps
City Council has taken regarding funding of these plans and explained staff’s recommendations for
both pension and OPEB funding, as follows:
1) Staff recommended transferring funds to keep up with actuarial contributions as
has been done in previous years. Staff suggested that $732,455 be transferred to
the Civilian Pension Plan, with $454,978 coming from the General Fund and
$277,477 coming from the Electric Fund this fiscal year.
2) In order to maintain the 10-year phase-in plan for OPEB, staff recommended
including the following percentages of base pay for the City’s OPEB
contributions in the FY12 budget: 6.6% for the General Fund, 5.3% for the
Water/Wastewater Fund, and 5.1% for the Electric Fund.
Referring to salary assumptions, Mr. Ruane indicated that the trend for salary increases was less than
4%. Responding, Mr. Porter stated that, although salaries are lower now, the projections performed
to determine member benefits encompass the next 5, 10, and 15 years. He explained that the
long-term assumption used must be consistent with the underlying inflation assumption, as well as
the investment return assumption. He assured members that this will continue to be monitored in
the future. Mr. Porter stated that the impact of reducing the salary from 5% to 4% was not
determined.
Page 24
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 20
Mr. Ruane felt that it would be beneficial for Council to receive information regarding the salary
assumption so that they could determine the future impact of salary increases when they are
considered.
In response to Mr. Ruane regarding the positive steps City Council has taken, Mrs. Mitchell
confirmed that the Civilian Pension Plan has been closed to new employees since September 2009.
In addition, she stated that City Council eliminated Medicare Part B coverage for new employees.
Council President Hogan noted that, as indicated on Page 12 of the General Employee Pension Plan
Actuarial Valuation, since July 1, 2006, the value of assets increased for four (4) years, yet during
this same period, the actuary liability increased. He questioned why the actuary liability continues
to increase if the City’s assets increased. Responding, Mr. Porter explained that between
July 1, 2008 and July 1, 2010, the increase in assets was $600,000, which he stated was a minimal
increase, partially due to investment losses that occurred during this time period. Therefore, he
stated, the actuarial value of assets has remained relatively stable during the past three (3) years.
It was his opinion that the actual accrued liability is growing because of the additional year of service
that members have earned; however, the actual value of assets has not grown to the same extent,
although contributions have been made to help cover what is referred to as “normal cost.”
Responding to Council President Hogan, Mr. Porter explained that a substantial amount of growth
in assets is necessary in order to realize a decrease in liability.
In response to Mr. Ruane, Mr. Porter indicated that many jurisdictions are reviewing the level of
benefits they currently provide and considering their ability to afford these levels based on their
current funding status. One of the most common approaches taken by municipalities is to close the
plan to new hires, which the City of Dover recently did. In addition, he stated that many jurisdictions
are reviewing retirement eligibility ages, the timeline when employees are fully eligible for
benefits, etc. He explained that the available options vary according to each jurisdiction’s individual
situation.
Mr. Leary noted that he recently met with Mrs. Mitchell to review this matter and that she provided
him a copy of a very helpful article from Government Finance Review Magazine, entitled
“Strategies to Consider as OPEB Costs Escalate,” which discussed creative strategies being
developed in other jurisdictions. He requested that staff provide members a copy for their
information.
In regard to the staff’s second recommendation pertaining to OPEB funding, Mr. McGiffin felt that
action would not be necessary at this time, since this matter will be considered during the Budget
Review.
The Committee recommended that staff be authorized to transfer $732,455 to the Civilian Pension
Plan, with $454,978 coming from the General Fund and $277,477 coming from the Electric Fund
this fiscal year.
During the Council Meeting, Mrs. Mitchell reviewed the information provided to the Committee.
Page 25
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 21
Mr. Leary moved for approval of the Committee’s recommendation authorizing staff to
transfer $732,455 to the Civilian Pension Plan, with $454,978 coming from the General Fund
and $277,477 coming from the Electric Fund this fiscal year. The motion was seconded by
Mr. McGiffin and unanimously carried.
Evaluation of Proposals - Investment Manager and Advisory Services
Mrs. Donna Mitchell, Controller/Treasurer, reminded members that the City issued its original
Request for Proposals (RFPs) for investment management services in 2001. The contract was
awarded to Wilmington Trust on January 14, 2002, with a one (1) year review and renewal option
if results were favorable. At that time, there was no provision for a contract end date. Given recent
events in the financial markets and changes in recommended practices of the Government Finance
Officers Association (GFOA) and the Internal Auditors Association, staff decided that it was time
to rebid this service.
Mrs. Mitchell explained that an outline of the process, including the forms completed for the fee
calculations, scoring, and evaluations, was provided to members to demonstrate the diligence staff
felt was necessary to assure the City’s assets are well managed and protected. In addition, staff
provided an explanation for their recommendation.
Mrs. Mitchell stated that staff narrowed the list of providers to three (3) firms: 1) Cutwater Asset
Management, 2) High Mark Capital Management, and 3) PFM Asset Management, LLC. She stated
that the three (3) firms selected were the most responsive of the lowest cost providers. The proposals
were almost equally matched, with the exception that the PFM Asset Management proposal went
above the requirements of the RFP. Staff conducted interviews with the three (3) finalists to
determine which firm would be the best fit for the City. Mrs. Mitchell advised members that
each firm was provided, in advance, the items to be discussed during the interview. Upon
completion of the interviews, staff contacted several of the client references provided in each firm’s
proposal. All responses were highly complimentary.
Staff recommended awarding the Investment Management Services contract to PFM Asset
Management, LLC for a three (3) year period, to start on the date of the contract. The contract can
be renewed or extended for two (2) additional two (2) year periods by mutual consent and approval
by City Council.
The Committee recommended approval of staff’s recommendation.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
Evaluation of Proposals - Investment Banking Custody Services
Mrs. Donna Mitchell, Controller/Treasurer, advised members that bids were solicited for
Investment Banking Custody Services. She noted that all submissions received were from major
financial institutions that are capable of managing custody of the City’s investment assets; however,
Wells Fargo and Union Bank were the two (2) most competitive banks.
Page 26
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 22
Mrs. Mitchell reminded members that the City currently has contracts with Wells Fargo as custodian
for three (3) Trust Funds: the General Employee Pension Fund, the Police Pension Fund
(closed plan), and the Other Post Employment Benefits (OPEB) Fund. Although the City receives
excellent service on these accounts from Wells Fargo, she stated that the Government Finance
Officers Association’s (GFOA) recommended practice is to diversify assets under custody when
possible.
Based on the fees, scores, and GFOA’s recommended practice, staff recommended awarding the
service contract to Union Bank for a three (3) year period to start on the date of the contract, which
may be renewed or extended for two (2) additional two (2) year periods by mutual consent and
approval by City Council.
The Committee recommended approval of staff’s recommendation.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
Review of Hospitality and Civic Function Policy (Committee Deferred on February 28, 2011
Pending Additional Information)
During their meeting of February 28, 2011, members considered a request from
Mayor Carleton E . Carey, Sr. to include certain functions offered by the Central Delaware Chamber
of Commerce and Kent County Tourism in the City’s Hospitality and Civic Function Policy.
Mayor Carey noted that these events are not covered under the City’s existing Policy. At that time,
members deferred action and requested that Mayor Carey provide the cost for each of the events
listed and the annual cost for members to attend these events.
Mayor Carey submitted a memorandum providing details regarding the costs associated for members
of Council to attend certain functions, as follows:
1. Central DE Chamber of Commerce Annual Awards Dinner $50.00 x 9ppl $450.00
2. Mayors Annual Prayer Breakfast $20.00 x 9ppl $180.00
3. Governors Annual Prayer Breakfast $16.00 x 9ppl $144.00
4. Kent County Economic Summit $25.00 x 9ppl $225.00
TOTAL $999.00
It was Mayor Carey’s feeling that these functions offer a great deal of information for the
City of Dover and enhance working relationships that benefit the City economically.
Mrs. Donna Mitchell, Controller/Treasurer, advised members that the City’s current Hospitality and
Civic Function Policy was written to conform more closely to IRS Regulations, which prohibit
attending events or activities sponsored by another organization unless official City business is
performed. She noted the Mayor’s concern that the City is a member of the organizations listed.
Mrs. Mitchell requested that staff be given the opportunity to revise the Policy submit it to members
at their next meeting for their review and recommendation to City Council.
Page 27
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 23
The Committee recommended deferral of the Review of the Hospitality and Civic Function Policy
to allow staff the opportunity to make revisions.
By consent agenda, Mr. Bonar moved for approval of the Committee’s recommendation,
seconded by Mr. Leary and carried by a unanimous roll call vote.
FY 2012 Five-Year Capital Investment Plan (CIP)
Due to time constraints, and there being no objections, Mr. Leary deferred review of the FY 2012
Five-Year Capital Investment Plan (CIP) until the next meeting.
Mr. Anthony DePrima, City Manager, noted that staff is in the process of developing a proposed
budget. He requested that members contact staff prior to the next meeting if they have any concerns
regarding the projects listed so that staff can respond during the meeting.
Mr. Leary stated that this matter would be placed first on the agenda for the Committee’s next
meeting.
Mr. Leary moved for acceptance of the Legislative, Finance, and Administration Committee
Report, seconded by Mr. McGiffin and unanimously carried.
FINAL READINGS - PROPOSED ORDINANCES
The First Readings of the following Proposed Ordinances were accomplished during the Council
Meeting of March 14, 2011.
Mr. Salters moved that the Final Readings of the Proposed Ordinances be acknowledged by
title only, seconded by Mr. Leary and unanimously carried.
Ordinance #2011-06 Amending Chapter 46 - Fire Prevention and Protection - Open Burning
Mr. Ruane moved for adoption of the proposed ordinance, seconded by Mr. Leary, and by a
unanimous roll call vote, Council adopted Ordinance #2011-06, as follows:
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Chapter 46 - Fire Prevention and Protection, Article I - In General, Section 46-5 - Open
Burning, be amended to read as follows:
Sec. 46-5. Open burning.
(a) Definitions. The following words, terms and phrases, when used in this chapter, shall
have the meanings ascribed to them in this section, except where the context clearly indicates
a different meaning:
Page 28
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 24
Barbecuing - Commercial. The preparation and cooking of food by way of gas grill, charcoal
grill, or other apparatus used for the cooking of food by way of flame produced through
wood, charcoal, or gas for the purpose of cooking food for the sale to and/or consumption
by the general public.
Barbecuing - Recreational. The preparation and cooking of food by way of gas grill, charcoal
grill, or other apparatus used for the cooking of food by way of flame produced through
wood, charcoal, or gas for the purpose of cooking food for the consumption by a family
and/or guests or by the membership of a private organization or church congregation.
Open Burning. The burning of materials wherein products of combustion are emitted
directly into the ambient air without passing through a stack or chimney from an enclosed
chamber.
Outdoor Fireplace. Any homemade or commercially produced fireplace, fire pit, or fire ring
used for the kindling of wood.
(b) Permit required. Open burning of structures, brush, or bonfires shall not be permitted
without a permit obtained from the Fire Marshal.
(c) Fire dimensions. Open burning, when permitted, shall be kindled in such a manner
as not to be a danger to other campers, recreational vehicles, tents, or structures and shall not
be of a size greater than 18 inches by 18 inches by 18 inches. Height of the fire shall be
measured from the ground or from the bottom of the inside of the container being used to
kindle the fire. Open burning shall not be kindled directly on the ground unless contained in
a fire ring.
(d) Fire clearances and time restrictions. Outdoor fireplaces shall have 36 inches
clearance from all combustibles when in use. Portable fire places, fire pits, or fire
rings shall be extinguished in a residential area between the hours of 12:00 midnight
and 8:00 a.m.
(e) Commercial barbecuing. Commercial barbecuing shall be permitted under the
following conditions:
(1) The location has been approved by City of Dover Licensing and Inspections
and the Fire Marshal and an Outdoor Public Gathering Permit has been obtained.
(2) One (1) fire extinguisher of not less than five (5) lbs. (pounds) ABC is to be
located within ten (10) feet of the cooking area. Cooking area and cooking fuels
shall be secured from public access.
(3) Approval from the Board of Public Health has been obtained.
(4) The operator shall make all reasonable attempts to avoid causing a nuisance
to nearby property owners with smoke, fumes, or sparks.
Page 29
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 25
(5) All compressed flammable gas containers used for cooking shall be secured
in such a way as to prevent them from being knocked, tipped, or blown over.
Any commercial barbecuing operations which are a continual nuisance because of
smoke, fumes, or sparks shall be terminated by the Code Official or Fire Marshal and the
Outdoor Public Gathering Permit revoked until such time as the Director of Licensing and
Inspections is satisfied that the problem has been corrected.
Barbecuing of any kind shall not be kindled within 200 feet of any fuel pump or
storage tank fill. Cooking grease shall not be disposed of by placing it directly on the ground
or in storm water drains.
(f) Prohibited - Multi-family residential dwelling units. In apartment buildings,
condominiums, or any other multi-family residential dwelling of three (3) or more units by
any other name, the storage of propane tanks inside units or on balconies is prohibited.
Recreational barbecuing shall be prohibited on any balcony or under any overhanging portion
or within 15 feet of any structure, except that the use of electrical ranges or electrical grills
shall be permitted. The use of outdoor fireplaces on balconies is prohibited.
(g) Fines. Any owner, occupant, contractor, or body corporate found to be in violation
of this section shall be issued a summons as provided for in Appendix F--Fees and Fines.
(h) Authority of the Fire Marshal. The Fire Marshal is authorized to impose a ban on
open burning if weather conditions do not safely permit open burning. The Fire Marshal or
Fire Officer shall order any fire extinguished that is deemed unsafe or not in compliance with
Section 46-5 of the Dover Code.
ADOPTED: MARCH 28, 2011
Ordinance #2011-09 - 2011 Budget Revisions
Mr. Leary moved for adoption of Proposed Ordinance #2011-09 - 2011 Budget Revisions, seconded
by Mr. McGiffin.
Mrs. Williams noted that the proposed ordinance includes both Budget Revisions and a Power Cost
Adjustment, and relayed concerns with some of the items in the Budget Revisions; therefore, she
requested consideration of the Power Cost Adjustment separately from the Budget Revisions.
Mrs. Williams moved to divide the motion by removing the Power Cost Adjustment (Line 288 of
Ordinance #2011-09) from the Budget Revisions, seconded by Dr. McGlumphy.
Mr. McGiffin stated his concerns regarding “piecemeal” budgeting. He indicated that including the
Power Cost Adjustment in the Budget Revisions presents them as a single package that encompasses
all adjustments desired including the Power Cost Adjustment; therefore, he did not support the
motion to divide.
Page 30
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 26
For clarification, Council President Hogan stated that the motion before members at this time was
to remove the Power Cost Adjustment from the Budget Ordinance to be voted upon separately. By
voting in the affirmative, a separate vote would be required for the Power Cost Adjustment and the
Budget Revisions.
The motion to divide the motion by removing the Power Cost Adjustment (Line 288 of Proposed
Ordinance #2011-09) from the Budget Revisions failed by a roll call vote of seven (7) no and two (2)
yes (Dr. McGlumphy and Mrs. Williams).
Referring to action taken by members earlier in the meeting regarding the Legislative, Finance, and
Administration Committee Report on the Actuarial Pension for Fiscal Year 2010/11 and OPEB
Benefit Rates for Fiscal Year 2011/12 Budget, Mr. Ruane noted that additional changes should be
made to reflect the transfer of $732,455 to the Civilian Pension Plan, with $454,978 coming from
the General Fund and $277,477 coming from the Electric Fund. He suggested that the
Budget Revision Ordinance reflect these amendments in Lines 102 and 329. Responding,
Mrs. Mitchell stated that her intention was to submit a separate budget amendment; however, she
relayed no objections to the amendments being made at this time. She advised members that it
would be necessary to revise the amount of $955,000 on Line 102 by adding $454,978, for a total
of $1,449,978, and on Line 329, the amount of $833,000 by adding $277,477, for a total of
$1,110,477.
Responding to Council President Hogan, Mrs. Mitchell explained that the amendments to Line 102
and 329 would increase the payment toward the unfunded liability.
Mr. Ruane moved to amend Proposed Ordinance #2011-09 by amending Line 102 by adding
$454,978, for a total of $1,449,978, and Line 329 by adding $277,477, for a total of $1,110,477. The
motion was seconded by Mr. Salters.
In response to Mr. DePrima, Mrs. Mitchell confirmed that the proposed amendment would create
an automatic revision to the fund balances.
Mr. Leary expressed his desire for staff to submit a separate budget amendment to allow for a
thorough review of the amendments.
The motion to amend Proposed Ordinance #2011-09 by amending Lines 102 and 329 to reflect the
increased payments to the Pension Fund failed by a roll call vote of seven (7) yes and two (2) no
(Mr. Salters and Mr. Ruane).
Responding to Mr. Ruane, Mr. DePrima stated that City Policy allows for a final budget amendment
to be included as a part of the final budget presented to City Council.
The motion for adoption of Proposed Ordinance #2011-09 - 2011 Budget Revisions
(Exhibit #1), was carried by a roll call vote of seven (7) yes and two (2) no (Dr. McGlumphy
and Mrs. Williams).
Page 31
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 27
Ordinance #2011-07, with Staff Amendment #1, Amending Chapter 46 - Fire Prevention and
Protection, Article III - Fire Codes, Section 46-126 - Fire Prevention Permit and Appendix F -
Fees and Fines
Mrs. Williams moved for adoption of the Proposed Ordinance, seconded by Mr. McGiffin, and
by a unanimous roll call vote, Council adopted Ordinance #2011-07 with Staff Amendment #1,
as follows:
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Chapter 46 Fire Prevention and Protection, Article III - Fire Codes, Section 46-126 - Fire
Prevention Permit, be amended to read as follows:
Sec. 46-126. Fire prevention permit.
(a) Required. It shall be unlawful to construct, enlarge, alter or demolish a fire protection
system without obtaining a fire prevention permit.
(b) Fee. Each applicant for a fire prevention permit, including, but not limited to,
sprinkler systems, fire alarms, hood suppression units, and tank installation, shall pay unto the city
a permit fee as provided for in Appendix F - Fees and Fines, before such permit shall be issued.
(c) Reinspections. There will be no charge for the first reinspection of a permit. The
applicant shall pay a fee for subsequent reinspections as provided for in Appendix F--Fees and Fines.
(d) Fire signaling system inspection fee. For each inspection of a fire alarm signaling
system located within the jurisdiction of the City of Dover and conducted by a licensed company
pursuant to Delaware State Fire Prevention Regulations, the licensed company shall submit a copy
of the certificate of inspection for each fire alarm system to the City of Dover Fire Marshal’s Office,
along with a non-refundable fee, as provided for in Appendix F - Fees and Fines.
(e) Fire suppression system inspection fee. For each inspection of a fire suppression
system located within the jurisdiction of the City of Dover and conducted by a licensed company
pursuant to Delaware State Fire Prevention Regulations, the licensed company shall submit a copy
of the certificate of inspection for each sprinkler riser to the City of Dover Fire Marshal’s Office,
along with a non-refundable fee, as provided for in Appendix F - Fees and Fines.
(f) Doubling of fees. Fees established in subsection (b) of this section shall be doubled
in the event that a permit is applied for after construction has commenced without the permission
of the fire marshal. The fire marshal shall waive the doubling of fees in cases where the permit
applicant is not a professional contractor and the work is not being done by a professional contractor.
Page 32
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 28
BE IT FURTHER ORDAINED THAT:
Appendix F - Fees and Fines, Chapter 46 - Fire Prevention and Protection, Article III - Fire Codes,
be amended to read as follows:
Chapter 46 - Fire Prevention and Protection, Article III - Fire Codes
Fees established in subsection (b) of this section shall be doubled in the event that a permit is
applied for after construction has commenced without the permission of the fire marshal. The fire
marshal shall waive the doubling of fees in cases where the permit applicant is not a professional
contractor and the work is not being done by a professional contractor.
Sec. 46-126 Fire Prevention Permit
$12.00 for each
$1,000.00 of costs or
multiple thereof of
Fee; Each applicant for a fire prevention the fire protection
Subsec. (b)
permit system; provided
that a minimum fee
for each permit shall
be $50.00
Subsec. ©) Reinspection
First reinspection No charge
Second reinspection $25.00
Third reinspection $50.00
Any subsequent reinspection $100.00
Subsec. (d) Fire signaling system inspection fee
$25.00 each fire
Certificate of inspection
alarm system
Exception: apartment or other
$25.00 each fire
multi-family dwelling - five (5) or
alarm system
less buildings per complex
Page 33
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 29
$15.00 each fire
alarm system up to a
maximum of twenty
Exception: apartment or other
(20) buildings.
multi-family dwelling - more than
Maximum fee per
five (5) buildings per complex
complex not to
exceed $300.00 for
fire alarm systems
Subsec. (e) Fire suppression system inspection fee
$25.00 each fire
Certificate of inspection
suppression system
Exception: apartment or other
$25.00 each fire
multi-family dwelling - five (5) or
suppression system
less buildings per complex
$15.00 each fire
suppression system
up to a maximum of
twenty (20)
Exception: apartment or other
buildings.
multi-family dwelling - more than
Maximum fee per
five (5) buildings per complex
complex not to
exceed $300.00 for
fire suppression
systems
Fines not paid within 14 days of the day the fine was issued, including the day the fine was issued,
shall be automatically doubled in amount.
ADOPTED: MARCH 28, 2011
COUNCIL MEMBERS ANNOUNCEMENTS
Council President Hogan announced that the Municipal Election will be held on Tuesday,
April 19, 2011, between 7:00 a.m. and 8:00 p.m. The polling places are: Elks Lodge #1903,
200 Saulsbury Road - 1st and 4th Districts; Seventh Day Adventist Church, 647 Wyoming Avenue -
2nd District; and Dover Park Recreation Center, 1210 White Oak Road - 3rd District.
He noted that to be eligible to vote, residents must be registered to vote with the State of Delaware
Department of Elections by Thursday, March 31, 2011. Absentee Ballots are available and further
information can be obtained by visiting the City’s website at www.cityofdover.com or by contacting
the City Clerk’s Office at 736-7008.
Page 34
CITY COUNCIL MEETING OF MARCH 28, 2011 PAGE 30
Council President Hogan also announced that City Council Meetings are rebroadcast on Verizon
Channel 20 and Dover TV at www.cityofdover.com on Tuesdays and Thursdays at 7:00 p.m. and
Saturdays at 11:00 a.m. He thanked Comcast for televising the City Council Meetings live and
providing video for rebroadcast.
Mr. McGiffin reminded members to mark their calendars for June 25, 2011 for the next African
American Festival.
Mr. Salters announced that the Sankofa African Dance Company, in collaboration with Pieces of a
Dream, a Modern Dance Company from New Castle County, will present a dance concert at
Delaware State University on Saturday, April 9, 2011, at 7:00 p.m. He stated that this is a free event,
open to the public, and is suitable for all ages.
Mr. Salters also advised members that the Inner City Cultural League, along with the 100% Tobacco
Free Corporation, will present basketball at the Pitts Center on Fridays at 5:00 p.m. beginning
April 8, 2011. He stated that all youth are invited and that there is a league for: 1) ages 7-9, 2) 10-13,
and 3) 14-17.
Mrs. Russell complimented Mr. McGiffin for his recent participation in the St. Patrick’s Day benefit
for the Dover Interfaith Mission.
By unanimous consent, Council President Hogan declared the meeting adjourned.
Meeting Adjourned at 8:51 P.M.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
March 28, 2011, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM/jg/js/dd/ac
S:\AGENDAS & MINUTES\Council-Minutes\2011\03-28-2011 COUNCIL.wpd
Exhibit to Original Minutes and File Copy
Exhibit #1 - Ordinance #2011-09 - 2011 Budget Revisions
Page 36
PROCLAMATION
WHEREAS, J. Sterling Morton, a Nebraska pioneer, understood that trees were needed for fuel and
building materials, for shade from the hot sun, and as windbreaks to keep soil in place; and
WHEREAS, J. Sterling Morton advocated tree planting by individuals and civic organizations and, on
January 4, 1872, proposed a tree-planting holiday to be called “Arbor Day”; and
WHEREAS, the first holiday was set for April 10, 1872, with prizes being offered to counties and
individuals for properly planting the largest number of trees and it was estimated that more than one million
trees were planted in Nebraska that day; and
WHEREAS, in 1885, Arbor Day was named a legal holiday in Nebraska and April 22, Morton’s birthday,
was selected as the date for its permanent observance. Today, it is most common for Arbor Day to coincide
with the best tree planting weather for the region; and
WHEREAS, the City of Dover was named a Tree City USA in 2010 for the twenty-first consecutive year by
the National Arbor Day Foundation, recognizing Dover for its outstanding urban forestry program; and
WHEREAS, the City of Dover Planning and Inspections Department’s Tree Planting and Preservation
Ordinance has caused the planting of thousands of trees in all subdivisions and commercial sites since 1992
and the City has been aggressively planting street trees, which are trees planted between the curb and the
sidewalk, in almost every available site in the City; and
WHEREAS, the Delaware State champion American Elm on The Green may be the only living witness to the
United States Constitution Ratification enacted at the Golden Fleece Tavern 233 years ago, underscoring
that the planting and caring for trees is a special gift that one generation passes down to the next.
NOW, THEREFORE, I, CARLETON E. CAREY, SR., MAYOR OF THE CITY OF DOVER,
DELAWARE, do hereby proclaim April 23rd, 2011 as ARBOR DAY in the City of Dover, and urge all
citizens to support the efforts to care for our trees along our streets, in our parks, and in our yards. As the
City of Dover plants trees on public property, I urge all citizens to plant trees on their property to enhance
the environment and promote the well-being of present and future generations.
____________________________________
CARLETON E. CAREY, SR.
Mayor
Page 37
PETITION TO AMEND ZONING ORDINANCE TEXT
Public Hearing before the
Dover City Council
April 11, 2011
Proposed Zoning Change: Amendment to Zoning Ordinance, Article 5 – Supplementary
Regulations, (New) Section 20, and Article 12 - Definitions
Summary of Amendment: Staff developed the proposed ordinance in support of the
recommendation in the 2008 Comprehensive Plan, to promote
green energy and building practices by removing obstacles in the
Building Code and Zoning Ordinances. The proposed ordinance
would allow small wind energy systems and solar energy systems
as an accessory use within all zoning districts. The proposed
ordinance sets standards, such as height, setback, and screening, to
ensure that placement of such structures protects the character of
the surrounding area.
In developing the proposed ordinance, staff reviewed the
provisions of the State statute regarding small wind energy
systems, which limits the ability of local governments to regulate
these systems in residential districts. The standards set forth in the
State statute are mirrored in the City’s proposed ordinance.
The proposed ordinance also adds definitions for “small wind
energy systems” and “solar energy systems”.
Recommendation of the
Planning Commission: Following a public hearing on March 21, 2011, where one member
of the public submitted a letter with regards to proposed changes to
the provisions relating to small wind energy systems, the Planning
Commission unanimously voted to recommend approval of the
proposed ordinance as presented (7 in favor, 2 absent).
Ordinance Number: 2011-01
File Number: MI-11-02
Page 38
Report to City Council on MI-11-02 – Solar and Wind Energy Ordinance
April 11, 2011
Page 2 of 4
Excerpt from the Planning Commission DRAFT Minutes of March 21, 2011:
MI-11-02 Text Amendments: Solar and Wind Energy Amendments - Public Hearing and
Review and Action on a Recommendation to City Council regarding proposed amendments to
the Zoning Ordinance. The proposed ordinance would allow solar energy systems and small
wind energy systems as accessory uses in all zoning districts, and set standards for such
systems within residential zones and non-residential zones. The proposed amendment adds a
new Article 5 Section 20 to the Zoning Ordinance and additional definitions to Article 12.
Ordinance #2011-01.
Representative: Staff
Mrs. Townshend provided an overview of the application
Mr. Holt questioned that what you are saying is if you put a wind power unit on your house it
would be just for your house you could not be selling to your neighbors. Responding to Mr.
Holt, Mrs. Townshend stated that yes, that is correct.
Mr. Tolbert stated that there are a lot of areas in Dover, because of the closeness of properties
to each other they would not be able to put in that kind of wind power unit. Responding to Mr.
Tolbert, Mrs. Townshend stated that this is correct. There are some places where it would not
be feasible because the setback is essentially the height of the tower plus one blade so you are
looking at probably fifty (50) feet from the property line. In some cases, that may not be a bad
thing because this is one of those things where it is new area and is a challenge. If you are real
close that’s where you end up with neighbors complaining about the noise of your wind turbine.
Mr. Holt questioned if Staff had any action on this now with anyone putting them in?
Responding to Mr. Holt, Mrs. Townshend stated that we have not had wind. If you drive up
Saulsbury Road you can see that The Little School, NCALL, and the City of Dover’s Electric
Administration building have solar roof mounted solar panels. We were approached by a
developer/property owner who owns a campus and they looked into putting solar panels on the
roofs. Because of the design of the building, the roof would not have supported them. That is
when they started looking at the idea of ground mounted and we determined that we need to set
a standard because the Code was virtually silent on it because we have not had this.
Mr. Nichols questioned what is the height of a free standing tower for wind? Responding to Mr.
Nichols, Mrs. Townshend stated that they are typically high; however, she does not know
specifically, but her understanding is they tend to be about fifty (50) feet high. They would have
to be setback by whatever the height of the tower plus one blade from the property line.
Mr. Nichols stated that there would be no wind at fifty (50) feet. The wind would not be there
and would have to be higher than that. The big towers are 240 feet tall and the propeller blades
are 240 feet in diameter and they are out where there is a lot of wind. There is hardly any place
around here where the wind would be restricted and would never turn it. Responding to Mr.
Nichols, Mrs. Townshend stated that anyone who is going to get a wind turbine for their house
or for their business, it would be on them to determine what the specifications are. Again, wind
varies depending on where you are so it would be on that person to determine if it is going to
work for them and how high it would need to be. What we would look at is if it is determined
that it needs to be seventy-five (75) feet then we would need to determine that it is seventy-five
(75) feet plus the length of the blade from your property lines.
Page 39
Report to City Council on MI-11-02 – Solar and Wind Energy Ordinance
April 11, 2011
Page 3 of 4
Mr. Tolbert stated that in this letter that we have, they make mention that there are devices that
do not use those propeller type uses and that they may be better for some sites. Responding to
Mr. Tolbert, Mrs. Townshend stated that it appears that way. In looking at the letter it appears
that the turbines with the propellers are the types of systems that Mr. Malkiewicz is concerned
about. However, that specifically is what the State statute gets at and severely limits our ability
to limit them so unfortunately, we are not able to take something and change it from the
minimum of what the State lets us do.
Mr. Hemmig questioned on line #36 Paragraph B under 24.12 regarding the sound not
exceeding five (5) decibels above the existing average noise level, how would you ever
determine that and how is it enforceable? Responding to Mr. Hemmig, Mrs. Townshend stated
that this is where we just took what the State gave us. If we were going to have to do that we
would have to get the measuring equipment or hire someone with that measuring equipment.
Mr. Tolbert questioned if the Police Department would have this measuring equipment for when
they receive noise complaints? Responding to Mr. Tolbert, Mr. Koenig stated that this is
different. This type of sound study would be similar to what they do on Federal road projects
where there are Federal funds. If they have to do some noise attenuation studies you would
hire that type of contractor and they have all kind of standards on how they measure decibels
and what is average and what is not average. It is not cheap.
Mr. Hemmig stated that regarding Line #80 where it talks about the setbacks being one times
the height for the propeller. No where around here is a maximum height stated; however, aren’t
there going to be some height restrictions with regards to the Air Force Base or FFA
requirements on maximum heights of towers in City limits? Responding to Mr. Hemmig, Mrs.
Townshend stated that the issue is that this is the area where the State preempted us on this.
She does not believe that they can actually give a maximum height as long as it meets the
setback. If there is something in terms of FFA with a small wind system they are not going to be
high enough to get into the FFA concerns. She is not sure about the Air Force Base. The Air
Force Base would have more concerns with a large wind energy system field. The idea is that
these are going to be smaller because the generations are less.
Mr. Hemmig stated that he would like to talk about the removal of solar energy system that is
not being used or is in disrepair. There is no timeframe given on how soon it has to be
removed. Should we have something in there such as six (6) months? Responding to Mr.
Hemmig, Mrs. Townshend stated that we had some extensive discussion about
decommissioning and the concern was that once you set a time, the issue becomes when it
comes into a state of disrepair then you address it. What we did not want to do, if for instance
there is an accessory solar structure and it is maintained but it is not operational for whatever
reason, as long as it is maintained and can be useable, immediately non-use is not the problem.
The problem is when they start to deteriorate and then they become a nuisance. If we set a
timeframe, we could end up causing something to be removed that could be fully functional if
you change tenants.
Mr. Hemmig further stated that on Line #119 where you define small wind energy system you
say primarily to reduce on-site consumption. That leaves them open for non on-site
consumption? Responding to Mr. Hemmig, Mrs. Townshend stated that typically as she
understands it, anywhere that people have solar or wind systems that are for that specific
property, there are typically cycles where they may produce more than they need and then can
Page 40
Report to City Council on MI-11-02 – Solar and Wind Energy Ordinance
April 11, 2011
Page 4 of 4
sell it back into the grid. She does not know if this is regulated by the Public Service
Commission; however, there is a mechanism for doing that and becomes secondary when there
is an excess that they are not using.
Mr. Hemmig opened a public hearing.
Mrs. Townshend stated that a letter was received from Michael J. Malkiewicz, Esquire who is a
City resident. He wanted to bring a couple of issues to our attention. He talks about the height
of the propeller. Windmills are sold that have vertical centrifugal wing devices rather than a
propeller and the noise created by the propeller or the noise of the vibrations of the structure
that the windmill is attached to. Damages caused by the structure and the windmill can come
apart during a storm were issues of concern. Some of the windmills that can be purchased by
residents and installed on their roofs or attached to their homes have given rise to nuisance
complaints by neighbors who are bothered by the constant noise or thumping of the propeller.
Essentially, his concern is the issue of windmills rather than centrifugal wing device; however,
this is an area where the State has preempted us in terms of the legislation that they have
passed.
Mr. Hemmig stated that we cannot add anything to say the tower plus any moving parts?
Responding to Mr. Hemmig, Mrs. Townshend stated that the height is the tower plus the blade.
In terms of something that spins horizontally and not vertically, we would end up looking at the
overall height because it is not higher than the tower. In terms of the central part of his concern,
she does not think that we are able to say that you cannot do the propellers.
Mr. Hemmig closed the public hearing after seeing no one else wishing to speak.
Mr. Ambruso moved to forward to City Council a recommendation of approval of MI-11-02 Text
Amendments: Solar and Wind Energy Amendments, the proposed ordinance that would allow
solar energy systems and small wind energy systems as accessory uses in all zoning districts
and set standards for such systems within the residential and non-residential zones, seconded
by Mr. Tolbert and the motion was unanimously carried 7-0 with Colonel Welsh absent and Mr.
Friedman leaving at 9:26 PM.
Page 42
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 3, 2011
APPLICATION: TEXT AMENDMENTS: SOLAR & WIND ENERGY
AMENDMENTS
FILE #: MI-11-02
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER
1. Our office has no objections to the proposed amendments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER / STORMWATER / GENERAL
1. None
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER / STORMWATER / GENERAL
1. Please be advised that the final location of these proposed structures will also need to meet other requirements within
the code. For example, the Water / Wastewater Handbook states “No structures, including permanent signage, may
be located within ten feet (10’) of water and wastewater utility infrastructure.”
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 43
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 10, 2011 T
===============================================================
APPLICATION: Solar and Wind Energy Amendments
FILE#: MI-11-02 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. DelDOT has no comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
Solar panel structures will not be allowed to be placed within the State’s right-of-ways.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 44
FINAL READING
CITY OF DOVER
PROPOSED ORDINANCE #2011-01
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3
4 That Appendix B - Zoning, Article 5 – Supplementary Regulations be amended by adding a new
5 section 20 as follows:
6 Section 20. Solar and small wind energy systems.
7
8
9
10
11
12
13
FT
Solar energy systems and small wind energy systems shall be permitted as accessory uses within
all zones subject to the following requirements:
20.1 Residential Zones.
20.11 Solar energy systems shall be subject to the following:
(a) Ground-mounted solar energy systems shall be permitted only in the rear yard.
14
15
16
17
18
19
20
21
22
23
RA (b) Ground-mounted solar energy systems shall be set back a minimum of five feet from
side and rear property lines, or the height of the tallest point on the system, whichever
is greater.
(c) Ground-mounted solar energy systems shall not exceed 15 feet in height.
(d) Ground-mounted solar energy systems shall be visually screened from adjacent
properties to a height of six feet by either an opaque fence or a dense vegetative
screen.
D
24
25
26
27
28
29
30
31
(e) All exterior electrical and/or plumbing lines must be buried below the surface of the
ground and placed in a conduit.
(f) Roof-mounted solar energy systems must comply with all building height
requirements for the zoning district where the system is to be installed.
20.12 Small wind energy systems in residential zones shall be subject to the following
restrictions:
32 (a) Small wind energy systems shall be set back 1.0 times the turbine height from
33 adjoining property lines. Turbine height means the height of the tower plus the length
34 of one blade.
Page 45
35
36 (b) The aggregate noise or audible sound of a small wind energy system shall not exceed
37 five decibels above the existing average noise level of the surrounding area and shall
38 be restricted to a maximum of 60 decibels measured at any location along the
39 property line of the parcel where the small wind energy system is located.
40
41 (c) Small wind energy systems shall be free from signage, advertising, flags, streamers,
42 decorative items, or any item not related to the operation of the wind turbine. Electric
43 wiring for the turbines shall be placed underground for non-building integrated
44 systems.
45
46 (d) Small wind energy systems shall not be permitted within the H (Historic District)
47 Zone.
48
49
50
51
52
53
54
55
56
FT
(e) Any small wind energy system shall be visually screened to a height of six feet by
either an opaque fence or a dense vegetative screen from any properties or structures
included on the National Register of Historic Places.
20.2 Non-Residential Zones.
20.21 Solar energy systems shall be subject to the following:
(a) For the purposes of this subsection, a use is considered accessory if it is located
57
58
59
60
61
62
63
64
65
66
RA within a complex or campus that includes one or more contiguous lots under common
ownership and management, where the principal use of the complex or campus is
other than a solar energy system, and the energy generated by the solar energy system
is intended to primarily reduce on-site consumption of utility-supplied energy.
(b) Ground-mounted solar energy systems shall not occupy more than 30 percent of the
lot area of the complex or campus for which the solar energy system is proposed.
(c) If ground-mounted solar energy systems are proposed to occupy more than 30 percent
of the lot area of the complex or campus, their placement shall be subject to
D
67
68
69
70
71
72
73
74
75
conditional use approval by the Planning Commission.
(d) Ground-mounted solar energy systems shall not be located between the principal
structure and the street upon which the principal structure fronts.
(e) All exterior electrical and/or plumbing lines must be buried below the surface of the
ground and placed in a conduit.
(f) Solar energy systems, whether roof-mounted or ground-mounted, must comply with
76 all building setback and height requirements for the zoning district where the system
77 is to be installed.
78
Page 46
79 20.22 Small wind energy systems shall be subject to the following restrictions:
80 (a) Small wind energy shall be set back 1.0 times the turbine height from adjoining
81 property lines. Turbine height means the height of the tower plus the length of one
82 blade.
83
84 (b) The aggregate noise or audible sound of a wind system shall not exceed five decibels
85 above the existing average noise level of the surrounding area and shall be restricted
86 to a maximum of 60 decibels measured at any location along the property line to the
87 parcel where the small wind energy system is located.
88
89 (c) Small wind energy systems shall be free from signage, advertising, flags, streamers,
90 decorative items, or any item not related to the operation of the wind turbine. Electric
91 wiring for the turbines shall be placed underground for non-building integrated
92
93
94
95
96
97
98
99
100
systems.
FT
(d) Small wind energy systems shall not be permitted within the H (Historic District)
Zone.
(e) Any small wind energy system shall be visually screened to a height of six feet by
either an opaque fence or a dense vegetative screen from any properties or structures
included on the National Register of Historic Places.
101
102
103
104
105
106
107
108
109
110
RA
20.3 Decommissioning.
Solar energy systems and/or small wind energy systems must be maintained and kept in a state
suitable for immediate operation. When it can be demonstrated that a solar energy system or
small wind energy system, as approved in accordance with this section, is in a state of disrepair
and is not suitable for immediate operation, that system shall be removed and the accessory use
terminated.
BE IT FURTHER ORDAINED:
That Appendix B – Zoning, Article 12 – Definitions, be amended to add the following
D
111
112
113
114
115
116
117
118
119
definitions:
Solar energy system. Any solar collector or other solar energy device, or any structural design
feature, mounted on a building or on the ground, and whose primary purpose is to provide for the
collection, storage, and distribution of solar energy for space heating or cooling, for water
heating, or for electricity.
Small wind energy system. A wind energy conversion system consisting of a wind turbine, a
120 tower, and associated control or conversion electronics which is intended to primarily reduce
121 on-site consumption of utility-supplied energy.
122
Page 47
123 SYNOPSIS
124 The proposed ordinance adds solar energy systems and small wind energy
125 systems as accessory uses within all zoning districts; sets standards for these
126 systems to ensure protection of the character of the zones, as well as public
127 health, safety and welfare; and adds definitions for such systems to the Zoning
128 Ordinance.
129
130 Actions History:
131 April 11, 2011 – Proposed Public Hearing/Final Reading - Council
132 March 21, 2011 – Planning Commission Review
133 February 14, 2011 – First Reading – Council
134 January 24, 2011 – Reconsidered by Utility Committee
135 January 10, 2011 – Introduced at Utility Committee and referred back to staff for changes
FT
RA
D
Page 48
PROPOSED AMENDMENTS TO THE 2008 COMPREHENSIVE PLAN
Public Hearing before the
Dover City Council
April 11, 2011
Proposed Amendment to the
2008 Comprehensive Plan
Part B: A summary of the proposed amendment to the 2008 Comprehensive Plan
follows. A detailed description and analysis of the proposed amendment
is provided in the following pages of this report.
Land Use Classification Change from Industrial to Residential
High Density (Map 12-1): This is an applicant-initiated request to
change property from an Industrial and Public Utilities land use
classification to a Residential High Density land use classification.
The property is located north of College Road, just east of the
railroad tracks. (Z-11-02)
This proposed amendment was initially part of the amendments
reviewed at the February 22, 2011 meeting of the Planning
Commission, but it was delayed due to an administrative error
involving the associated rezoning application.
Land Use Classification Change from Institutional to Residential
High Density (Map 12-1): This is an applicant-initiated request to
change property from an Institutional land use classification to
Residential High Density land use classification. The property is
located at 101-405 Dove View Drive, just north of Delaware Route 8
between Saulsbury Road and the Modern Maturity Center. It was
previously approved under a PND: Senior Citizen Housing Option,
as senior apartments. The applicant wishes to develop as apartments
without an age restriction. (Z-11-03)
City Council held a public hearing on March 14, 2011, City Council
held a public hearing, following which they deferred action on this
requested amendment, pending a decision from the Planning
Commission on the cross-access requirement between the DoveView
site and the Modern Maturity Center.
Ordinance Number: 2011-08
File Number: MI-11-01B
Page 49
MI-11-01 – 2011 Comprehensive Plan Amendments – Part B
Report to City Council – April 11, 2011
Page 2
Project Background:
The 2008 Comprehensive Plan was adopted by City Council on February 9, 2008, and
subsequently amended on November 23, 2009 in conjunction with the 2009 Comprehensive
Rezoning Project. As adopted, the Comprehensive Plan sets forth a process by which the
Comprehensive Plan can be amended on an annual basis. Amendments to the Comprehensive
Plan can be initiated by staff or requested by members of the public. For amendments to the
Comprehensive Plan that involve rezoning of property, the requests are processed concurrently.
The process to amend the Comprehensive Plan is detailed in the 2008 Comprehensive Plan,
Chapter 15: Implementation, specifically on pages 183 and 184 of the Plan.
The proposed amendment was initially part of the series of amendments reviewed by the
Planning Commission on February 22, 2011, but due to an administrative error involving the
associated rezoning application, the proposed amendment was delayed, along with the rezoning
application.
The attachments include: Map 12-1B – Amendments to the Land Development Plan Map and a
table titled “2011 City of Dover Land Development Plan Map Changes 12-1”. This table lists
the parcels proposed to be amended in the proposed amendments to the 2008 Comprehensive
Plan.
Land Use Classification Change from Industrial to Residential High Density (Map 12-1)
This proposed amendment is an applicant-initiated amendment, where the applicant is requesting
that certain properties located north of College Road to the east of the railroad tracks be changed
from Industrial and Public Utilities land use classification to Residential High Density land use
classification. This is associated with application number Z-11-02 Lands of College Road
Management at Railroad Avenue. The affected parcels include the following:
ED-05-067.00-02-53.00-000
ED-05-067.00-02-54.00-000
ED-05-067.00-02-55.00-000
ED-05-067.00-02-56.00-000
According to the applicant:
The property is currently zoned industrial/manufacturing. It is adjacent to residential
zoning and institutional zoning (Delaware State University). Its zoning as RG-5 is
the same as a large adjacent parcel (Mishoe Towers). As such, the proposed
comprehensive plan amendment and zoning is more compatible with neighboring
uses. It is a unique isolated parcel, not likely to result in an undesirable precedent
for other parcels. The pattern of development as high density residential is more
consistent with surrounding development than would be manufacturing.
The subject parcel is a somewhat land-locked group of parcels, bound on the west by the railroad
tracks, on the south by College Settlement and Mishoe Towers, on the east by Fork Branch, and
on the north by a large agricultural parcel that lies in Kent County. There are a number of
Page 50
MI-11-01 – 2011 Comprehensive Plan Amendments – Part B
Report to City Council – April 11, 2011
Page 3
unimproved and/or marginally improved platted streets that connect the parcels with College
Road, both along the railroad tracks and through College Settlement. The subject property was
annexed into the City in 2006, and was the subject of subdivision application number SB-08-01C
– College Road Professional Park. This proposed subdivision did not proceed to the preliminary
or final phases of subdivision, and has expired.
There are a number of constraints on the site that would need to be addressed in the context of a
development application for the site. These include: access, brownfield considerations, and the
presence of flood plain and wetlands along the stream corridor.
Regarding High Density Residential uses, on Chapter 12 – Land Development, page 147 and
148, the 2008 Comprehensive Plan recommends the following:
The Comprehensive Land Development Plan recommends that high density
residential be dispersed throughout the City along arterial roadways in close
proximity to other high-density residential uses, schools, neighborhood commercial
areas, transit service, and other compatible non-residential land use areas. High
density residential development is also appropriate in some areas of the downtown,
most of which are shown as mixed use on the Land Development Plan.
The subject site is located along College Road, which is identified as an Urban Minor Arterial in
the 2008 Comprehensive Plan. It is within proximity to North Dover Elementary School,
Delaware State University, a number of employers, other high density residential development,
and transit service. However, the railroad tracks provide an impediment to accessing some of
these services by foot. There is no supporting commercial use in the immediate vicinity.
Additionally, the limited road access to the site combined with the environmental constraints
make it less suitable for high density residential development. Apartments could be constructed
on the site under a medium density zoning classification. Based on the recommendations of the
2008 Comprehensive Plan relative to medium density residential versus high density residential,
a medium density residential designation would support up to eight dwelling units per acre,
while high density designation would support density greater than eight dwelling units per acre.
While in most cases, changing the land use designation from Industrial and Public Utilities
would be viewed as hindering opportunities for economic development, in this case, site access
will likely include using the street system in College Settlement, a residential area.
Land Use Classification Change from Institutional to Residential High Density (Map 12-1)
This proposed amendment is an applicant-initiated amendment, where the applicant is requesting
that certain properties located north of Forrest Avenue (Delaware Route 8) west of Saulsbury
Road be changed from Institutional land use classification to Residential High Density land use
classification. This is associated with application number Z-11-03 Lands of CRM Mid-Atlantic,
LLC. The affected parcel is ED-05-076.07-01-30.00-000.
According to the applicant:
Doveview was approved by the City as an aged restricted apartment complex under
the Planned Neighborhood Design Senior Housing Option. The approved project
Page 51
MI-11-01 – 2011 Comprehensive Plan Amendments – Part B
Report to City Council – April 11, 2011
Page 4
consists of 192 units within 4 – four story buildings. Construction stopped in 2008,
leaving two partially completed, four-story buildings. CRM Mid-Atlantic obtained
ownership of the project through foreclosure proceedings. As the senior housing
market is no longer financially viable due to current economic conditions, CRM Mid-
Atlantic LLC requests that a comprehensive plan amendment and change in zone to
allow the apartments to be rented by the general public. The current land use
designation and zoning are institutional and institutional/office (IO), respectively.
CRM Mid-Atlantic LLC seeks a change in the land use designation to high density
residential, and to rezone the property to general residence (RG-5). RG-5 is the only
zone that will permit the existing four story apartment buildings to remain without
requiring a variance in the height and number of stories from the Board of
Adjustment. Although RG-5 allows for higher density (approx 326 units), the number
of units that can actually exist on this property is dictated by the parking
requirements in the zoning code. Doveview (as approved) has 246 parking spaces,
which is 1.3 spaces per unit. Rezoning to RG-5 requires 2.25 parking spaces per
unit. Doveview is located in an area surrounded by commercial, institutional, and
residential uses. The requested zoning is consistent with the goals of the
Comprehensive Plan because Doveview is close to services, jobs, and transit.
The subject parcel was previously approved as DoveView Apartments, a Planned Neighborhood
Design – Senior Citizen Housing Option. Under the provisions of the Zoning Ordinance in
Article 3 §24 for the Planned Neighborhood Design Option (File Number C-03-08 and C-06-02),
a property zoned IO (Institutional and Office Zone) is permitted to be considered for
development with the PND: Senior Citizen Housing Option through the Conditional Use review
process.
The DoveView PND – Senior Citizen Housing Option plan included 192 dwelling units in four
four-story apartment buildings. The plan as approved would include 246 parking spaces and an
overall density of 28.52 dwelling units per acre.
The City issued building permits for the four buildings that make up DoveView in late 2007 and
early 2008. Construction began on two buildings and ultimately ceased. The property went into
foreclosure and is now owned by CRM Mid-Atlantic, LLC (Sun Trust Bank). Because
construction ceased for more than one year, the site development plan associated with DoveView
has expired (Zoning Ordinance, Article 10 §2.491(a)). Site development plan approval is
required prior to initiation of any construction activity on the site, regardless of the outcome of
the request to amend the Comprehensive Plan.
Regarding High Density Residential uses, on Chapter 12 – Land Development, page 147 and
148, the 2008 Comprehensive Plan recommends the following:
The Comprehensive Land Development Plan recommends that high density
residential be dispersed throughout the City along arterial roadways in close
proximity to other high-density residential uses, schools, neighborhood commercial
areas, transit service, and other compatible non-residential land use areas. High
density residential development is also appropriate in some areas of the downtown,
most of which are shown as mixed use on the Land Development Plan.
Page 52
MI-11-01 – 2011 Comprehensive Plan Amendments – Part B
Report to City Council – April 11, 2011
Page 5
The subject site is located off Saulsbury Road and Delaware Route 8, both of which are
identified as Urban Minor Arterials in the 2008 Comprehensive Plan. It is also within proximity
(walking distance) to schools (Booker T. Washington Elementary School, William Henry Middle
School, and the Academy of Dover), commercial areas (including the TD Bank and Walgreens
Drug Store on adjacent parcels and the Gateway West Shopping Center to the south, across
Forrest Avenue), transit service, and other services (including medical offices).
Recommendation of the Planning Staff and Planning Commission:
Land Use Classification Change from Industrial to Residential High Density (Map 12-1)
Staff recommended against changing the land use classification of properties north of College
Road from Industrial and Public Utilities to Residential High Density. Staff supported amending
the Land Development Plan Map in this area to Residential Medium Density land use
classification. (#18-21 on Table: 2011 City of Dover Land Development Plan Map Changes 12-
1)
The reason that staff supported Residential Medium Density rather than Residential High
Density relates to the constraints inherent in the site, particularly site access and environmental
constraints. While the site does have access to transit and proximity to some services, site
access, environmental constraints, and the lack of commercial and other supporting services
make it less suited for high density residential development. Because access to the site would
most likely be provided through College Settlement, the request for a residential use is more
compatible with the area than the current Industrial and Public Utilities classification. Adequate
access to the site must be addressed in any subsequent development application.
Staff recommendations were made prior to public hearing. At the Planning Commission meeting
on March 21, 2011, the applicant made the case in favor of a Residential High Density land use
classification, stating that the type of apartment building permitted in a high density residential
zone would have less impact on the sensitive resources on the site. He stated that the bulk
standards and features on the site would prevent the full utilization of high density on the stie,
but would give design flexibility that would allow for less impact on the environmental resources
on the site. Following a public hearing before the Planning Commission on March 21, 2011, the
Planning Commission unanimously voted to recommend that the City Council approve the
requested Comprehensive Plan amendment from Industrial to Residential High Density land use
classification.
Land Use Classification Change from Institutional to Residential High Density (Map 12-1)
Staff recommends in favor of changing the land use classification of property north of Forrest
Avenue and west of Saulsbury Road, known as DoveView from Institutional to Residential High
Density land use classification. Staff also believes that the proposed rezoning supports the
articulated need for affordable housing within the City of Dover. This need is articulated in the
2008 Comprehensive Plan, and has also been consistently articulated by City Council at their
annual retreats. (#17on Table: 2011 City of Dover Land Development Plan Map Changes 12-1)
The location of the site near the intersection of two Urban Minor Arterial streets, within walking
distance to a variety of goods and services, and served by public transportation, make this a
suitable site for high density residential development. Additionally, one of the challenges
Page 53
MI-11-01 – 2011 Comprehensive Plan Amendments – Part B
Report to City Council – April 11, 2011
Page 6
typically encountered when considering high density residential development is the resistance
from residential neighbors living in lower density residential developments. This location is not
directly adjacent to other, lower density residential development that would generate these types
of conflicts.
Staff recommendations were made prior to the public hearing before the Planning Commission.
Following a public hearing on February 22, 2011, where several members of the public spoke
with regards to the requested Land Development Plan change, the Planning Commission voted to
recommend in favor of the proposed amendments to the 2008 Comprehensive Plan with seven
members voting in favor and two members absent.
On March 14, 2011, City Council held a public hearing on the proposed amendments to the 2008
Comprehensive Plan, where members of the public expressed concern about the required cross-
access drive between the Modern Maturity Center and the DoveView site if the DoveView
apartments were to be open to non-senior citizen residents. Following the public hearing, City
Council moved to defer action until the Planning Commission had considered a request by the
Modern Maturity Center to eliminate the cross-access requirement between the sites. On March
21, 2011, after a public hearing where members of the public testified with regards to this
request, the Planning Commission voted to eliminate the requirement for a cross-access drive,
continuing to require a cross-access path for pedestrians and golf carts, with seven members in
favor, one member voting in opposition of the motion, and one member absent.
Attachments: Map 12-1B Land Development Plan Proposed Amendments
Map 12-1A Land Development Plan
Table entitled “2011 City of Dover Land Development Plan Map Changes 12-1”
Excerpt from DRAFT Planning Commission Minutes of March 21, 2011
Excerpt from Planning Commission Minutes of February 22, 2011
Page 54
City of Dover,
Delaware
Map 12-1B
Land Development Plan
Proposed Amendments
Legend
Residential High Density
Dover Boundary
Dover Parcels
µ
0
Adopted February 2009
1,100 2,200 4,400 6,600 8,800
Feet
Map Created By:
Planning Office
Date Map Created: 12-14-10
Date Map Printed: 3-30-11
Page 55
City of Dover,
Delaware
Map 12-1A
Land Development Plan
Legend
Active Agriculture
Commercial
DoverAFB
Industrial and Public Utilities
Institutional
Mixed Use
Office
Open Space, Conservation, Recreation
Residential High Density
Residential Low Density
Residential Medium Density
Train Track
Water
Dover Boundary
Dover Parcels
µ
0
Adopted February 2009
1,100 2,200 4,400 6,600 8,800
Feet
Map Created By:
Planning Office
Date Map Created: 12-14-10
Date Map Printed: 3-30-11
Page 56
2011 City of Dover Land Development Plan Map Changes 3-30-11 (MI-11-01)
Existing Land Use Current Proposed Planning Commission
ID Parcel # Property Address Proposed Land Use Classification Use Reference Staff Recommendation City Council Action
Classification Zoning Zoning Recommendation
17 ED-05-076.07-01-30.00 101-405 DoveView Dr. Institutional Residential High Density Vacant IO RG-5 Z-11-03 Residential High Density Residential High Density
18 ED-05-067.00-02-55.00 College Settlement Industrial Residential High Density Vacant M RG-5 Z-11-02 Residential Medium Density Residential High Density
19 ED-05-067.00-02-54.00 College Settlement Industrial Residential High Density Vacant M RG-5 Z-11-02 Residential Medium Density Residential High Density
20 ED-05-067.00-02-53.00 Grove St. Industrial Residential High Density Vacant M RG-5 Z-11-02 Residential Medium Density Residential High Density
21 ED-05-067.00-02-56.00 College Settlement Industrial Residential High Density Vacant M RG-5 Z-11-02 Residential Medium Density Residential High Density
Page 57
Excerpt from DRAFT Planning Commission Minutes of March 21, 2011
MI-11-01 Comprehensive Plan Amendments 2011 (Part B) - Public Hearing and Review for
Recommendation to City Council of an Amendment to the 2008 Comprehensive Plan, as
amended, for a request to revise the Land Use Classification associated with a series of
properties of application Z-11-02. Ordinance #2011-08. Consideration of this request for Land
Use Classification revision (Items #18-21) associated with rezoning application Z-11-02 was
rescheduled at the February Planning Commission Meeting.
Z-11-02 Lands of College Road Management Inc, Kent Storage Facilities Inc. & Loralex
Company, LLC at Railroad Avenue - Public Hearing and Review for Recommendation to City
Council on a rezoning application consisting of four parcels of land totaling of 30.78 acres ±.
The property is currently zoned M (Manufacturing Zone). The proposed zoning is RG-5
(General Residence Zone for Mid-rise Apartments). The subject property is located north of
College Road and east of the railroad corridor and Railroad Avenue. The owners of record are
College Road Management Inc., Kent Storage Facilities, LLC and Loralex Company, LLC.
Property Addresses: Grove Street and Railroad Avenue. Tax Parcels: ED05-067.00-02-53.00-
000, ED05-067.00-02-54.00-000, ED05-067.00-02-55.00-000, and ED05-067.00-02-56.00-000.
Council District 4. Ordinance #2011-04. This application was removed from the February
Meeting agenda due to complications with the Public Notice requirements.
Representative: Conny Malmberg, Principal of the Project.
Mrs. Townshend stated the proposed amendment to the 2008 Comprehensive Plan Part B, as
you recall, this was pulled from the list of amendments from last month due to an error in public
notice, no fault of the applicant. This is a request to change the Land Use Classification from
Industrial to Residential High Density on property adjacent to Railroad Avenue and Grove Street
just north of College Road behind College Settlement. The application includes four (4) parcels
of land currently zoned IPM and shown as Industrial in the Comprehensive Plan. It did come
forward to the Planning Commission as a manufacturing subdivision for a builder/contractor
yard or something of that nature. The challenge was that the only access was adjacent to the
railroad tracks which created issues with DelDOT approvals in terms of queuing on the tracks
and being an unsafe condition. The only other potential access is to come through College
Settlement. The applicant is requesting to change the Land Development Plan to allow for High
Density Residential because since they will need to take access through a residential
community, a residential use would be more appropriate than an industrial use.
Mrs. Townshend further stated that again, the Comprehensive Plan recommends that High
Density Residential be dispersed throughout the City along arterial roadways in close proximity
to other High Density Residential uses, schools, neighborhood commercial areas, transit
service, and other compatible non-residential land use areas. In terms of this particular
property, it is located just off of College Road which is identified as an urban minor arterial in the
Comprehensive Plan. It is near but across the railroad tracks from North Dover Elementary
School. It is also near Delaware State University. A number of employers include the College
Road Business Park adjacent to the site and on the other side of the railroad tracks are other
high density residential development and transit services. The railroad tracks do impose
somewhat of an impediment accessing these services by foot. There is no neighborhood
commercial in the immediate location. There is limited road access. Access will need to be
addressed at the time of development and there are environmental constraints that could make
it less suitable for high density. There are significant woodlands on the eastern portion of the
site wetlands as well. It is adjacent to the Fork Branch Natural area.
Page 58
Mrs. Townshend further stated that Staff would suggest that Medium Density Residential would
be more appropriate and that would allow for up to eight dwelling units per acre. High Density
would support more than that. We do believe that residential is more appropriate because the
access will need to take place through the residential development of College Settlement.
Mr. Malmberg stated that the original plan that we did some engineering on was an industrial
yard or a contractor’s storage yard. There is a lot of need for that because of restrictions,
especially the County on outdoor storage on people’s lots and houses. With regards to
contractor equipment, we went through the process with DelDOT and their concern was that left
turning traffic onto the existing industrial road which is Railroad Avenue has a fifty-five foot wide
access which would be adequate. We would be queuing on the railroad tracks that are
immediately to the left of the four (4) parcels that make up this application except for the one in
the middle which is Mishoe Towers. Left hand turning traffic would be queuing on the railroad
tracks and they were concerned with big vehicles. There was really no good way of getting in
there. We looked at jug handles and things like that and there was just no good right-of-way to
make it work. The College has tried to purchase the property a couple of times, but has never
been able to get it together to pull the trigger so that caused a lot of the delay between then and
now. We need to move forward and are looking for a reasonable use of the property. High
Density Residential made the most sense to them and requires access again for safety reasons
not most likely down Railroad Avenue but through College Development or Grove Street that
would require some improvements on our part. DelDOT disfavors if not actually prohibits
industrial traffic through residential neighborhoods. It is fairly obvious that it had to be
residential since we cannot access it very well for industrial purposes down Railroad Avenue
and it does not make sense to go through the residential neighborhood. Staff supports the
change in zoning from its current Industrial use. He questioned if he is doing their zoning and
the Comprehensive Plan change together?
Responding to Mr. Malmberg, Mrs. Townshend stated that it is two separate public hearings;
however, the case is the same for both so you can address both now.
Mr. Malmberg further stated that the Planning Department supports the residential use because
of the logical reasons that he just illustrated. The only difference we have is whether it is High
Density Residential or Medium Density Residential and the reasons that they suggest Medium
Density Residential are reasons that I would suggest you support High Density Residential. The
site has a very distinct drop-off almost like a cliff with it being a fairly high site and then it drops
off significantly down to the stream that runs down underneath the bridge next to DSU. The site
is contiguous to DSU and the site is about thirty (30) acres. Twelve to thirteen of those acres
are on the other side of the drop off which is basically all wetlands which leaves about
seventeen (17) acres. Three (3) of those seventeen acres are under restriction until 2019 for
monitoring because a long time ago part of this site was used for encasing bad stuff, some sort
of hazardous materials in concrete and then shipping it out. There are monitoring wells on
those three acres of the site which makes them unusable for the next eight (8) years. Because
of other constraints of setbacks and things like that, by the time you factor all those things in,
engineering, roadways, and parking, we would not request and would commit to not putting
more units in there than would be allowable under the Medium Density Residential which is 240
apartment units; however, we need a high density zoning classification so that we can achieve
that because without that because of design constraints, he does not think with three story
garden style apartments were permitted under the zoning classification suggested by Staff, we
would be able to achieve the density. We would commit to not exceeding the 240 units which
Page 59
Staff is okay with; however, we would like the design ability to design buildings that would allow
us to achieve those 240 units.
Mr. Malmberg further stated that a couple of things that would suggest that you support this
position are that this is on an arterial roadway which is supportive of the high density zoning that
has been requested. There is, as noted by the Staff report, the transit services available. It
says it is not supporting commercial use; however, this property is adjacent to DSU and less
than a mile from the Acme Shopping Center and Dover Downs. It is a logical place for this use
of the property and for construction and design we think it is important to have the High Density
Residential zoning that we have requested.
Mr. Holt questioned that they would rather go with the High Density than the Medium Density is
that correct? Responding to Mr. Holt, Mr. Malmberg stated that the request is for RG-5 and was
surprised that it was not supported by the Planning Staff. Responding to Mr. Malmberg, Mrs.
Townshend stated that the height issues would prevent, without a PND, clustering of the density
in a taller building.
Mr. Friedman stated that his understanding in reading that the Staff’s concerns were primarily
the environmental constraints and those are defined specifically as the cliff drop off and the
wetlands that reside below. Responding to Mr. Friedman, Mrs. Townshend stated yes, these
were the concerns.
Mr. Friedman stated that with regards to the limited street access, he did not quite understand
that. Are we talking about percentage, could you explain further? Responding to Mr. Friedman,
Mrs. Townshend stated that they are not public streets so there is quite a bit that needs to be
figured out.
Also responding to Mr. Friedman, Mr. Koenig stated that not to mention that they are not public
streets; however, there is property that is not actually in City limits so there is property that is
located in Kent County. These are paper streets that were platted many, many years ago and
in some cases, there may be encroachments on those platted paper streets. The City has not
monitored this because the streets are located in Kent County. There are a number of
challenges related to access to the property that would have to be resolved for future
development.
Mr. Hemmig questioned did you do the calculations for how many units you could build with
Medium Density versus High Density? Responding to Mr. Hemmig, Mr. Malmberg stated that
Medium Density is easy to figure out; it is eight (8) units per acre and there is thirty (30) acres so
it is 240 units. High density he does not even know if there is a density limit.
Also responding to Mr. Hemmig, Mrs. Townshend stated that High Density is based on the
minimum square footage which is 900 square foot per unit; however, the arithmetic only gets
you so far because as Mr. Malmberg indicated, once you factor in certain things like parking.
Interjecting Mr. Malmberg stated that his figure would be forty-five (45) units per acre and unless
we are going to build a skyscraper that is not going to happen. He would be willing to commit to
not creating more than the 240 units which would be under the Medium Density category. It just
gives us more design flexibility for buildings that could actually get to that point if we are down to
a useable twelve (12) acres.
Mrs. Townshend stated that we cannot, through the zoning process, restrict any commitments
made during the rezoning process. It cannot be enforced as conditions on a development
application. That becomes the challenge; however, again the site restraints are going to push
Page 60
down the density from a theoretical density of forty-five (45) units because the land area is not
there to support it once you take out the restrained portions. The other option would be under
the Medium Density zoning classification a Planned Neighborhood Design could be
implemented to allow for the bulk standard waivers to get that density higher up.
Mr. Hemmig stated that we essentially have a situation where we have to take Mr. Malmberg’s
word for it, if we allow High Density that he will not exceed 240 units.
Mrs. Townshend stated that you can do two public hearings at once consecutively since we
discussed both matters.
Mr. Hemmig opened the public hearing for MI-11-01 Comprehensive Plan Amendments 2011
(Part B) and after seeing no one wishing to speak closed the public hearing.
Mr. Hemmig opened a public hearing for Z-11-02 Lands of College Road Management, Inc.,
Kent Storage Facilities Inc & Loralex Company, LLC at Railroad Avenue.
Mr. James Galvin – Staff Member of Kent County MPO – Stated that in the comments that
they made on the rezoning application, which we technically do not do, one of the things that we
are concerned about is maintaining rail access into the City and County. The fact that this
property is immediately adjacent to the rail line and they share a right-of-way, the MPO would
like to see some kind of buffer between the rail line and the residential units. He is not sure how
you could use the property, but something to make it part of the project so that you do not have
the immediate nuisance of the rail with the residents of the property.
Mr. Hemmig closed the public hearing after seeing no one else wishing to speak.
Mr. Hemmig stated that this is one of his major concerns as well and apartment complex right
next to the railroad tracks. He has the occasion to be in JP Court quite often and that is a brick
building of masonary construction and it is a good 100 feet away from the railroad tracks and
that building shakes like crazy when a train comes through even at a very slow speed. He does
not know why anyone would want to live in an apartment right next to railroad tracks. Will you
be able to meet the MPO’s recommendation of the buffer?
Responding to Mr. Hemmig, Malmberg stated that he assures you that it would be in both the
uses best interest as well as the railroads best interest to give as much separation as possible
for the reasons that you just stated.
Mr. Friedman moved to forward to City Council approval of MI-11-01 Comprehensive Plan
Amendments 2011(Part B) from Industrial to Residential High Density, seconded by Mr. Tolbert
and the motion was unanimously approved 8-0 with Colonel Welsh absent.
Excerpt from Planning Commission Minutes of February 22, 2011
MI-11-01 Comprehensive Plan Amendments 2011 - Public Hearing and Review for
Recommendation to City Council of a series of Amendments to the 2008 Comprehensive Plan,
as amended, by replacing Table 12-1: Land Use and Zoning Matrix and Map 12-1: Land
Development Plan. The amendment to Table 12-1 is to add zoning classifications to the Open
Space land use classification in the Land Use and Zoning Matrix. The series of amendments to
Map 12-1: Land Development Plan Map will revise the Land Use Classification from Open
Page 61
Space for certain properties to more appropriate classifications based on the property uses and
surrounding uses.
Representative: Staff
Mrs. Townshend stated that there are two (2) Staff recommended changes to the
Comprehensive Plan. Both are fine tuning things that happen as the Plan is implemented. You
will recall that back in July; the Planning Commission looked at the rezoning of properties to the
Recreational and Open Space (ROS) zoning classification that had been created earlier in
2010. When Staff was going through to determine which properties to bring forward for
rezoning to that classification, we picked up some errors. Essentially, areas that for example
may have been a house that somehow were made green on the Land Development Plan Map.
We did not bring forward a recommendation to rezone the uses that are not consistent with the
Open Space classification to the Recreational and Open Space zoning. The first part of this
application is to correct the areas that were picked up in the green areas on the Development
Plan Map which is what is expected in the Comprehensive Rezoning phases when you get into
more of the parcel level analysis rather than the broad brush that you do at the Comprehensive
Plan level.
Mrs. Townshend further stated that if you look at the table that was included in your packet, you
are looking at numbers 1 through 16 which are essentially properties that were painted green in
the Comprehensive Plan that when we went to apply that zoning classification, we determined
that this was not in fact the current use or the intended used for those areas. This is a clean-up
for the Comprehensive Plan.
Mrs. Townshend further stated that the second part of this relates to the implementation of the
Recreational and Open Space Zone. Staff is proposing a number of amendments to the Land
Development Plan chapter in the Land Use and Zoning Matrix which is Table 12-1 of the
Comprehensive Plan that would, instead of having the language of: “Lands that are on the Land
Development Plan as Open Space are not proposed for rezoning. They will remain as zoned as
of this printing. Once an Open Space Zone is developed, some areas will be proposed for
rezoning for this designation.” Following the implementation of the Open Space Zone or what
turned out to be the Recreational and Open Space Zone, recommendation is to amend this
Table as it relates to Open Space by putting the ROS (Recreation and Open Space Zone) and
the RC (Recreational and Commercial Zone) as the appropriate zoning classifications for that
Land Use category.
Mr. Hemmig questioned if there were any Commission member comments or questions at this
time and there were none.
Mr. Hemmig questioned that the second part of the Open Space is going to be Recreational and
Commercial Zone, what is the commercial part? Responding to Mr. Hemmig, Mrs. Townshend
stated that these two zoning classifications are the classifications that would be acceptable in
this area. When Staff was looking at what to rezone to recreation and open space areas, the
Maple Dale Country Club is shown as Open Space in the Comprehensive Plan. They had some
concerns about rezoning that as it would take them from Recreational and Commercial Zone to
the Recreational and Open Space Zone. At the time of the proposed rezoning, they voiced their
concerns on the record and the decision was recommended by the Planning Commission and
approved by City Council to have them retain their zoning of RC. When you look at what the
appropriate land use classifications are, it makes more sense to change the table then it would
to change the map.
Page 62
Mr. Hemmig further questioned regarding Table 12-1 where there are general land use
categories and low and high density, he noticed certain zonings are in more than one category.
Responding to Mr. Hemmig, Mrs. Townshend stated that essentially, the intent of this Table is to
give guidance so that when a rezoning application comes before the City, the Planning
Commission, City Council and Staff that you can use that Table as a basis to determine if this is
what the Comprehensive Plan intended. In some cases, for instance, a zoning classification
that falls into more than one would be the R-8 which is a one family classification. It is a single
family detached zoning designation which has some of the lower density attributes; however, it
is a higher density than some of the others.
Mrs. Townshend further stated that in terms of #3 listed in the report this is being pulled out
entirely. It will be brought forward next month as a separate amendment to the Comprehensive
Plan. The other applicant initiated Comprehensive Plan Amendment is a change in
classification from Institutional to Residential High Density.
Mr. Hemmig questioned if there was a representative at the meeting for DoveView and if they
would please come down to the podium.
Representative: Mr. Gregg Moore, Becker Morgan Group, Inc. representing Sun Trust Bank.
Mrs. Townshend stated that in the report what you have is the verbiage provided by the
applicant to justify the change in the Comprehensive Plan as well as the analysis of Staff.
Essentially, DoveView, if you will recall, was previously approved as a Senior Citizen Housing
Option project under the PND for 192 dwelling units and age restricted for 55 aged and over.
The apartments were under construction and construction ceased in about 2008 and nothing
has moved forward. What we have now is two (2) partially completed buildings and an expired
Site Plan. Regardless of the zoning classification and whether it remains what it is zoned now
or whether it is rezoned, you will see it back as a Site Development Plan application.
Mrs. Townshend further stated that the applicant is requesting to use the housing style and the
housing density that was approved for DoveView, but not have it age restricted. It is clear that
they will not be able to achieve the number of units that DoveView was approved for because
there are parking issues. DoveView did not provide 2.25 parking spaces per unit because when
it was senior housing it was less. She believes, based on what DelDOT recommended during
the PLUS review, that there will be a Traffic Impact Study required or at least the discussion of
that with the potential of paying into the area-wide study. What they are looking to do is utilize
the infrastructure that was put in place for DoveView and to capture a portion of that density
through multi-story apartment buildings; however, not age restricted. They are requesting, in
terms of the Comprehensive Plan, a change to Residential High Density in terms of the zoning
which will be #3 on the agenda; they are requesting RG-5. This will be a separate action by the
Planning Commission once the Comprehensive Plan Amendment is dealt with because the two
are tied together. It is important that the applicant speaks on the matter and that the public
speak during the public hearing.
Mr. Moore stated that Sun Trust Bank has been in suit with the previous developer DoveView,
LLC and prevailed in that suit. Around the 16th to the 20th of February a new deed was filed in
the name of the bank and that deed is CRM Mid-Atlantic, LLC which was setup by the bank to
own it. This transfer to the bank has just occurred in the last week or ten days and what the
bank is trying to do is act quickly and get this property back into productive use. They want to
clean the property up and bring on a developer to continue to build or rebuild these buildings.
Page 63
They understand to do that they have to go back through the Site Plan process and have talked
to Staff with regards to the process of doing that. We, at Becker Morgan Group, have evaluated
the plan and believe that there will be significantly less units than you have seen before in an
RG-5 project with 2.25 parking spaces per unit under the RG-5 zoning classification. It was
1.25 with the senior project with 246 parking spaces to serve 192 units.
Mr. Moore further stated that they have done a Concept Plan for the bank and have estimated
for them the total number of units as an RG-5 project would be somewhere around 120 and 144
units not 190, so it is coming down significantly. We believe that a whole building will be
dropped off of the plan as there will not be four (4) buildings; however, there will be no more
than three (3). There will be fewer units with less folks on the property with it being a non-senior
project. The banks intention is to sell this project to a developer who will be the entity that
reconstructs, operates, owns, and managers the new project once we get it conceived and the
bank is prepared to continue through the Site Plan process. We also need to go through a
complete building evaluation to make sure we do the right thing with these buildings because
they have been sitting there for a number of years. There are structural and environmental
evaluations that they are doing to make sure that we properly bring these buildings back into
service without causing a problem.
Mr. Hemmig opened a public hearing.
Mr. Leonard Iacono - Stated that he has some concerns regarding what the request is. From
afar, he has been following this project as a major developer in the area. From what he
understands, this original project was initially approved for condominiums. There was then a
trade-off done changing it from a condominium unit to allow for age restricted apartments. He
questions the validity of putting out and lifting age restricted requirements given what the
original intent was. He does not know where all of this is going at the end of the day; however,
if he is correct, this is the history here. He personally thinks that it should stay that way.
Mrs. Carolyn Fredericks – Executive Director, Modern Maturity Center – Stated that she
believes that there is a great need for affordable senior housing in Dover. She understands the
buildings need to have some work done and obviously she would like to have a nice neighbor
there as well. Her concern is, and we have filed the appropriate paperwork, to get rid of the
connectivity between the two properties should the zoning be changed.
Mr. James Hutchison – 15 Glen Eagles Court- Stated that he is currently a board member of
the Modern Maturity Center and for the record, he feels that it is very important that you keep in
mind the Modern Maturity Center has over 20,000 members. When he looks next door at the
DoveView Apartments, the complex itself was originally designed for senior citizens that have
changed. Making it compatible between the two facilities is not so at this point. He would urge
all of you to consider that for a public safety point of view. When he looks at the number of
people who are going in and out of the senior center every single day many of these people are
much older than average and have disabilities and some have severe disabilities. So again, I
urge you to look at this as far as any connection between roadways for the application and the
Modern Maturity Center.
Mr. Hemmig stated with regards to clarification we are not considering any connection tonight
on whether it should exist or not. That will be a separate application by the Modern Maturity
Center should they desire to bring that forward. Tonight, we are only considering the land use
consideration and the rezoning of that property.
Page 64
Mrs. Joyce Breasure-Herrick – President, Modern Maturity Center - Stated that she would
like to encourage you to consider the wonderful opportunity Dover has to use the facility, the
Modern Maturity Center and have dedicated senior citizen housing which we desperately need
in Kent County and specifically in Dover. What a wonderful environment it would be for
someone to be able to come out of the apartment or condominium cross a little bridge, come
into our facility for medical services, physical therapy services, lunch, line dancing, art classes,
and higher education classes. It needs to be 55-plus housing as we desperately need the
housing.
Mr. Hemmig closed the public hearing after seeing no one else wishing to speak.
Mr. Hemmig stated that he would like to clarify that the Commission is considering Items #1 thru
#17 on the Land Use Classification Map. Items #18 through #21 apply to the item that was
taken off of the agenda this evening. Under the proposed amendments, we are considering
Items #1, 2 and 4 for Land Use Classifications under MI-11-01 application.
Colonel Welsh stated that while not applicable at this time his concern has to do with the senior
housing as DoveView. He does not know the details as to why construction stopped on
DoveView. He would assume it has something to do with finances. He does not know if it had
anything to do with demand. While all of us envisioned having senior housing and hoped that it
would be, it certainly has been an eyesore for a couple of years. The question is do we
continue with the eyesore or do we go with someone who will move forward with this project and
develop it as something other than the original intent of senior housing. Did they not foresee a
need for senior housing in the area?
Responding to Colonel Welsh, Mr. Moore stated that the bank has been trying to find a
partner/developer to take the project on as it has been in a lawsuit trying to get control of the
property and has not been able to find any partner or developer to take it on as a full senior
development. The bank believes that this is because of the market as it has dropped
significantly for senior housing. They believe to be able to market this property and bring it back
into use. They are going to need to be able to do that with more than just senior apartments
given the realities of what has happened. Their goal is to bring it back into code compliant
construction standards and continue the construction. They need to be able to do that with the
diversity of the housing with not just the senior option.
Colonel Welsh further questioned if there was no chance that the bank may be willing to stay
with it to try and find a developer for senior housing? Responding to Colonel Welsh, Mr. Moore
stated that the bank does not feel that it is viable as a senior only project.
Mr. Hemmig questioned if Sun Trust Bank or your firm as representative or the potential
developer has done any actual market surveys to indicate that a rental apartment would be as
or more viable than a senior housing apartment? Responding to Mr. Hemmig, Mr. Moore stated
that they have met with, talked with, and negotiated with developers to take it over. They will be
bringing a partner in to actually do the construction because they are a bank and this is not what
they do so they have relied on their partners. The name that this comes from, CRM Mid-Atlantic
actually has the expertise and that is what they are drawing on to make that conclusion which is
why he is here tonight.
Mr. Tolbert asked if their plan is to develop the site for both senior citizens as well as others.
Responding to Mr. Tolbert, Mr. Moore stated that yes they would. As you have heard this from
other developers such as the Seskinore project which was one that started as simply a senior
Page 65
project and struggled in being able to market to others than just seniors. They came back and
said that they could have a more viable project if they could open up to non-seniors. Clearly this
is a good position for senior apartments as they have elevators and the project can be good for
seniors to live there; however, at a 140 plus or minus units, we do not believe that it is viable in
this market to be able to bring it back into and pump the money in that is necessary to redo the
buildings.
Mr. Tolbert further stated that the question that comes to mind is that when you develop a site
for seniors as well as others, seniors require additional kinds of amenities in their apartments
than people who are under senior citizen age, would that not be a problem? Responding to Mr.
Tolbert, Mr. Moore stated that no in fact, the two buildings that are there, their strategy will be to
follow through on the way that they were being built to accommodate only seniors. Our project
will accommodate seniors and will attract seniors in a large way; we do believe that. However,
we do not believe that at the numbers we are at, the senior housing is viable with just seniors.
We need to have the opportunity to get others to make it financially viable for a developer and
reconstruction of the buildings. There is significant reconstruction to consider in these buildings
because they have been open for so long. They have environmental issues, there are some
structural issues and they are evaluating those; so, it is not like they are just going to come in
and start putting siding on these buildings. There is a lot of money that needs to be pumped in
to some degree to go backwards a little before we can go forward to get them into a code
compliant component of a building.
Colonel Welsh stated that this is the thought process that he had as we were going along and
we heard the testimony from the public. Just because it is no longer age restricted does not
mean that seniors cannot obviously rent an apartment there and move in and still have full use
of the Modern Maturity Center and the other facilities. It is an ideal location with the bank right
there, Walgreens, and the Modern Maturity Center. He would think this would attract a great
number of seniors. Responding to Colonel Welsh, Mr. Moore stated that the bank and the
developers that they have talked to have the same idea. There will be a large amount of
seniors that will want to come here because of the position of where it is and what it offers. The
numbers are just not strong enough to revitalize the whole project.
Mr. Ambruso questioned what they are voting on separately? Responding to Mr. Ambruso, Mr.
Hemmig stated on the proposed amendment there are three (3) items. The first item will be the
Land Use and Zoning Matrix Table to include the new Recreational and Open Space Zone and
the Recreational and Commercial Zone. The second item is the Land Development Map plan
change Items #1 through #17 to change the existing land use classification to what is shown as
proposed. To take them out of Open Space and put them into one of the various residential or
institutional land use classifications. The third item will be the specific land use classification
change from institutional to Residential High Density for what is known as the DoveView
apartments. Their zoning will be a separate issue.
Colonel Welsh moved to forward to City Council approval of MI-11-01 Comprehensive Plan
Amendments 2011 to adopt the Land Use Table and the changes associated with it. That we
adopt the map that depicts the Land Use changes (Items #1-16) and that we make a
recommendation to change the Land Use classification for DoveView Apartments (Item #17).
This excludes Items #18 through #21 on the Land Development Plan Map changes. Seconded
by Mr. Tolbert and the motion was unanimously carried 7-0 with Mr. Friedman and Mr. Holt
absent.
Page 66
FINAL READING
CITY OF DOVER
PROPOSED ORDINANCE #2011-08
1 AN ORDINANCE AMENDING THE 2008 COMPREHENSIVE PLAN BY REPLACING
2 MAP 12-1: LAND DEVELOPMENT PLAN
3
4 WHEREAS, the City Council of the City of Dover, on February 9, 2009, adopted the 2008
5 Comprehensive Plan pursuant to Title 22, Section 702 of the Delaware Code; and
6
7 WHEREAS, the Honorable Jack Markell, Governor of the State of Delaware, certified the 2008
8 Comprehensive Plan on April 24, 2009; and
9
10
11
12
13
14
15
16
17
18
FT
WHEREAS, the City Council of the City of Dover, on November 23, 2009, adopted the 2009
Comprehensive Rezoning Project and 2009 Comprehensive Plan Amendments; and
WHEREAS, the 2008 Comprehensive Plan allows for an annual amendment process; and
WHEREAS, a property owner has requested an amendment to the Land Development Plan Map
(Map 12-1) in accordance with the process set forth in the 2008 Comprehensive Plan, and an
administrative error caused incomplete public notice with regards to the rezoning application
associated with this request, causing a delay in the Planning Commission hearing the application
19
20
21
22
23
24
25
26
27
28
29
RA
on the originally scheduled date of February 22, 2011; and
WHEREAS, the Planning Commission held a public hearing on March 21, 2011, after which the
Commission made a recommendation in regards to the proposed amendments to the Land
Development Plan related to the above request.
NOW, THEREFORE, BE IT ORDAINED THAT the Mayor and Council of the City of Dover
hereby amend Map 12-1: Land Development Plan of the 2008 Comprehensive Plan, as amended
on November 23, 2009 and on March 14, 2011, by replacing the referenced map with the
Amended Map 12-1 presented to City Council on April 11, 2011.
D
30
31
32
33
34
35
36
37
38
The proposed ordinance would adopt amendments to the 2008
Comprehensive Plan, as amended on November 23, 2009 and March 14,
2011.
Actions History
April 11, 2011
March 21, 2011
February 28, 2011
-
-
-
SYNOPSIS
Public Hearing/Final Reading – Council
Planning Commission Review
First Reading – Council
Page 67
PETITION TO AMEND AND ZONING DISTRICT
Public Hearing before the
Dover City Council
April 11, 2011
Applicants/Owners: College Road Management Inc.
Loralex Company, LLC
Kent Storage Facilities Inc.
Address: 1.696 Ac. Grove St., Dover
LT 207-211 College Settlement, Dover
LT 212-215 College Settlement, Dover
LT 197-201 College Settlement, Dover
Location: North side of College Road, east of the Railroad tracks, north of
College Settlement and Mishoe Towers
Tax Parcel ID #s: ED-05-067.00-02-53.00-000
ED-05-067.00-02-54.00-000
ED-05-067.00-02-55.00-000
ED-05-067.00-02-56.00-000
Size: 30.78+/- acres
Present Use: Vacant
Present Comprehensive
Plan Designation: Industrial and Public Utilities
Proposed Comprehensive
Plan Designation: Residential High Density
Present Zoning: M (Manufacturing Zone)
Proposed Zoning: RG-5 (General Residence for Mid-Rise Apartments Zone)
Reason for Request: To allow for the development of residential dwellings.
File Number: Z-11-02
Page 68
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 2
This rezoning application consists of four parcels of land totaling approximately 30.78 acres,
owned by College Road Management, LLC; Loralex Company, LLC; and Kent Storage
Facilities, LLC. The property is currently zoned M (Manufacturing Zone). The proposed zoning
is RG-5 (General Residence Zone for Mid-Rise Apartments). The subject area is located north
of College Road and Mishoe Towers and east of the railroad tracks. Tax Parcel: ED-05-067.00-
02-53.00-000, ED-05-067.00-02-54.00-000, ED-05-067.00-02-55.00-000, ED-05-067.00-02-
56.00-000.
The rezoning proposal is made in conjunction with a request to amend the 2008 Comprehensive
Plan, Map 12-1 Land Development Plan, to change the subject parcel from Industrial and Public
Utilities land use classification to Residential High Density land use classification. Analysis of
this request is in the report for file MI-11-01 – 2011 Comprehensive Plan Amendments.
Existing Property:
The subject parcel is a somewhat land-locked group of parcels, bound on the west by the railroad
tracks, on the south by College Settlement and Mishoe Towers, on the east by Fork Branch, and
on the north by a large agricultural parcel that lies in Kent County. There are a number of
unimproved and/or marginally improved platted streets that connect the parcels with College
Road, both along the railroad tracks and through College Settlement. The subject property was
annexed into the City in 2006, and was the subject of subdivision application number SB-08-01C
– College Road Professional Park. This proposed subdivision did not proceed to the preliminary
or final phases of subdivision, and has expired.
There are a number of constraints on the site that would need to be addressed in the context of a
development application for the site. These include: access, the presence of a brownfield area,
the presence of flood plain and wetlands along the stream corridor.
Surrounding Land Uses:
There are a variety zoning classifications and land uses surrounding the subject property.
Immediately south of the subject site, between the subject property and College Road, are a
series of properties that are zoned RM-2 (Medium Density Residence Zone), RG-5 (General
Residence Zone for Mid-Rise Apartments), and IO (Institutional and Office Zone). The RG-5
property is Mishoe Towers, a mid-rise apartment building directly adjacent to the subject site.
The RM-2 properties are a combination of residentially developed properties and vacant
properties comprising College Settlement. The IO property includes the Delaware State
University Sports Annex and Peoples Place shelter and transitional housing.
The property to the east of the subject parcels, across the Fork Branch, is zoned IO (Institutional
and Office Zone) and is the Delaware State University campus. The property to the north of the
subject site is in unincorporated Kent County, and consists of an approximately 146-acre
agricultural parcel that is zoned RS-1 (Single Family Residential District) and bisected by the
railroad tracks. This area is identified in the 2008 Comprehensive Plan as Industrial and Public
Utilities land use classification.
To the west of the subject site, across the railroad tracks, is the College Road Business Park,
which includes M (Manufacturing Zone) and CPO (Commercial and Professional Office
District).
Page 69
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 3
Comprehensive Plan:
In the 2008 Comprehensive Plan, the Land Development Plan (Map 12-1 as amended, dated
11/23/2009) recommends that this property be used for Industrial and Public Utilities Uses. As
previously stated, the rezoning request is associated with a request to amend the 2008
Comprehensive Plan to reflect the land use on Map 12-1 as Residential High Density. The
requested zone is consistent with the requested land use classification, but not with the existing
land use classification.
The Land Development Plan (Chapter 12) of the 2008 Comprehensive Plan states the following
with regard to high density residential development:
The Comprehensive Land Development Plan recommends that high density
residential be dispersed throughout the City along arterial roadways in close
proximity to other high-density residential uses, schools, neighborhood commercial
areas, transit service, and other compatible non-residential land use areas. High
density residential development is also appropriate in some areas of the downtown,
most of which are shown as mixed use on the Land Development Plan.
The subject site is located along College Road, which is identified as an Urban Minor Arterial in
the 2008 Comprehensive Plan. It is within proximity to North Dover Elementary School,
Delaware State University, a number of employers, other high density residential development,
and transit service. However, the railroad tracks provide an impediment to accessing some of
these services by foot. There is no supporting commercial use in the immediate vicinity.
Request for RG-5 (General Residence Zone for Mid-Rise Apartments)
Within the RG-5 Zone, the following uses are permitted: one-family detached dwellings; mid-
rise apartments; public buildings, structures and uses; raising of field and garden crops,
vineyards and orchards, and nurseries.
According to Article 12 of the Zoning Ordinance, the definition of mid-rise apartments is as
follows:
Mid-rise apartment: Multiple dwellings where individual dwelling units share a
common outside access, and elevators serve each floor. The dwelling units share a
common lot area, which is the sum of the required lot areas of all dwelling units
within the building.
The following is a summary of the bulk standards, as specified in Article 4, Section 4.6.
For Multiple Dwellings:
Minimum required:
Lot area (sq. ft.) 900 per dwelling unit
Lot width (ft.) 100
Page 70
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 4
Lot depth (ft.) 125
Front yard (ft.) 25
At the ground level or at any setback level, one-sixth of the height of the
nearest outside wall of the building measured in each case from the
Side yard (ft.)
average level of thefinished grade along the side of the building, but in no
case less than 25 feet.
At the ground level or at any setback level, one-sixth of the height of the
nearest outside wall of the building measured in each case from the
Rear yard (ft.)
average level of the finished grade along the rear of the building, but in no
case less than 25 feet.
Off-street parking
2/Du
spaces
Accessory
commercial uses 1 per employee or 1 per 300 sq. ft. of floor area, whichever is greater.
parking spaces
25% of the lot area shall be devoted to open area, not including parking
Open space
areas.
Maximum permitted:
Building height
Stories 6
Feet 70
Recommendation of the Planning Staff:
This request is to rezone land from M (Manufacturing) to RG-5 (General Residence Zone for
Mid-Rise Apartments). This request is made in conjunction with a request to amend the 2008
Comprehensive Plan, Map 12-1 Land Development Plan, as it relates to this property. The
approval of this rezoning request is contingent upon the approval of the associated amendment to
the 2008 Comprehensive Plan.
As stated in the report for MI-11-01 – 2011 Comprehensive Plan Amendments, staff did not
support the change from Industrial and Public Utilities to Residential High Density, and the
associated rezoning of the subject property from M (Manufacturing) to RG-5 (General Residence
Zone for Mid-Rise Apartments). Staff believed that the constraints on the site, specifically the
environmental constraints and limited street access to the site make it unsuitable for high density
residential use. Staff supports changing the site from Industrial and Public Utilities to Residential
Medium Density in the 2008 Comprehensive Plan rezoning the subject parcels from M
(Manufacturing) to a medium density zoning classification (RM-1, RM-2, or RG-2) accordingly.
A medium density zoning classification could be coupled with the Planned Neighborhood
Design (PND) to cluster the units on the site.
Page 71
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 5
This recommendation was made prior to the public hearing held by the Dover Planning
Commission. The Planning Commission held a public hearing on the proposed rezoning at its
meeting on March 21, 2011. At this meeting, the applicant made the case for the requested RG-5
(General Residence Zone for Mid-Rise Apartments) zoning, stating that the type of apartment
building permitted in the RG-5 zone would have less impact on the sensitive resources on the
site. He stated that the bulk standards and features on the site would prevent the full utilization of
high density on the site, but would give design flexibility that would allow for less impact on the
environmental resources on the site. Staff acknowledged this to be the case, also noting that this
could be accomplished through a Planned Neighborhood Design.
Following the public hearing on March 21, 2011, where one member of the public spoke with
regards to the rezoning application, the Planning Commission unanimously voted (8 members
voting in favor and 1 member absent) to recommend that City Council approve the rezoning
from M (Manufacturing) to RG-5 (General Residence Zone for Mid-Rise Apartments) as
requested by the applicant.
Page 72
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 6
Excerpt from the DRAFT Planning Commission Minutes of March 21, 2011
MI-11-01 Comprehensive Plan Amendments 2011 (Part B) - Public Hearing and Review for
Recommendation to City Council of an Amendment to the 2008 Comprehensive Plan, as
amended, for a request to revise the Land Use Classification associated with a series of
properties of application Z-11-02. Ordinance #2011-08. Consideration of this request for Land
Use Classification revision (Items #18-21) associated with rezoning application Z-11-02 was
rescheduled at the February Planning Commission Meeting.
Z-11-02 Lands of College Road Management Inc, Kent Storage Facilities Inc. & Loralex
Company, LLC at Railroad Avenue - Public Hearing and Review for Recommendation to City
Council on a rezoning application consisting of four parcels of land totaling of 30.78 acres ±.
The property is currently zoned M (Manufacturing Zone). The proposed zoning is RG-5
(General Residence Zone for Mid-rise Apartments). The subject property is located north of
College Road and east of the railroad corridor and Railroad Avenue. The owners of record are
College Road Management Inc., Kent Storage Facilities, LLC and Loralex Company, LLC.
Property Addresses: Grove Street and Railroad Avenue. Tax Parcels: ED05-067.00-02-53.00-
000, ED05-067.00-02-54.00-000, ED05-067.00-02-55.00-000, and ED05-067.00-02-56.00-000.
Council District 4. Ordinance #2011-04. This application was removed from the February
Meeting agenda due to complications with the Public Notice requirements.
Representative: Conny Malmberg, Principal of the Project.
Mrs. Townshend stated the proposed amendment to the 2008 Comprehensive Plan Part B, as
you recall, this was pulled from the list of amendments from last month due to an error in public
notice, no fault of the applicant. This is a request to change the Land Use Classification from
Industrial to Residential High Density on property adjacent to Railroad Avenue and Grove Street
just north of College Road behind College Settlement. The application includes four (4) parcels
of land currently zoned IPM and shown as Industrial in the Comprehensive Plan. It did come
forward to the Planning Commission as a manufacturing subdivision for a builder/contractor
yard or something of that nature. The challenge was that the only access was adjacent to the
railroad tracks which created issues with DelDOT approvals in terms of queuing on the tracks
and being an unsafe condition. The only other potential access is to come through College
Settlement. The applicant is requesting to change the Land Development Plan to allow for High
Density Residential because since they will need to take access through a residential
community, a residential use would be more appropriate than an industrial use.
Mrs. Townshend further stated that again, the Comprehensive Plan recommends that High
Density Residential be dispersed throughout the City along arterial roadways in close proximity
to other High Density Residential uses, schools, neighborhood commercial areas, transit
service, and other compatible non-residential land use areas. In terms of this particular
property, it is located just off of College Road which is identified as an urban minor arterial in the
Comprehensive Plan. It is near but across the railroad tracks from North Dover Elementary
School. It is also near Delaware State University. A number of employers include the College
Road Business Park adjacent to the site and on the other side of the railroad tracks are other
high density residential development and transit services. The railroad tracks do impose
somewhat of an impediment accessing these services by foot. There is no neighborhood
commercial in the immediate location. There is limited road access. Access will need to be
addressed at the time of development and there are environmental constraints that could make
it less suitable for high density. There are significant woodlands on the eastern portion of the
site wetlands as well. It is adjacent to the Fork Branch Natural area.
Page 73
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 7
Mrs. Townshend further stated that Staff would suggest that Medium Density Residential would
be more appropriate and that would allow for up to eight dwelling units per acre. High Density
would support more than that. We do believe that residential is more appropriate because the
access will need to take place through the residential development of College Settlement.
Mr. Malmberg stated that the original plan that we did some engineering on was an industrial
yard or a contractor’s storage yard. There is a lot of need for that because of restrictions,
especially the County on outdoor storage on people’s lots and houses. With regards to
contractor equipment, we went through the process with DelDOT and their concern was that left
turning traffic onto the existing industrial road which is Railroad Avenue has a fifty-five foot wide
access which would be adequate. We would be queuing on the railroad tracks that are
immediately to the left of the four (4) parcels that make up this application except for the one in
the middle which is Mishoe Towers. Left hand turning traffic would be queuing on the railroad
tracks and they were concerned with big vehicles. There was really no good way of getting in
there. We looked at jug handles and things like that and there was just no good right-of-way to
make it work. The College has tried to purchase the property a couple of times, but has never
been able to get it together to pull the trigger so that caused a lot of the delay between then and
now. We need to move forward and are looking for a reasonable use of the property. High
Density Residential made the most sense to them and requires access again for safety reasons
not most likely down Railroad Avenue but through College Development or Grove Street that
would require some improvements on our part. DelDOT disfavors if not actually prohibits
industrial traffic through residential neighborhoods. It is fairly obvious that it had to be
residential since we cannot access it very well for industrial purposes down Railroad Avenue
and it does not make sense to go through the residential neighborhood. Staff supports the
change in zoning from its current Industrial use. He questioned if he is doing their zoning and
the Comprehensive Plan change together?
Responding to Mr. Malmberg, Mrs. Townshend stated that it is two separate public hearings;
however, the case is the same for both so you can address both now.
Mr. Malmberg further stated that the Planning Department supports the residential use because
of the logical reasons that he just illustrated. The only difference we have is whether it is High
Density Residential or Medium Density Residential and the reasons that they suggest Medium
Density Residential are reasons that I would suggest you support High Density Residential. The
site has a very distinct drop-off almost like a cliff with it being a fairly high site and then it drops
off significantly down to the stream that runs down underneath the bridge next to DSU. The site
is contiguous to DSU and the site is about thirty (30) acres. Twelve to thirteen of those acres
are on the other side of the drop off which is basically all wetlands which leaves about
seventeen (17) acres. Three (3) of those seventeen acres are under restriction until 2019 for
monitoring because a long time ago part of this site was used for encasing bad stuff, some sort
of hazardous materials in concrete and then shipping it out. There are monitoring wells on
those three acres of the site which makes them unusable for the next eight (8) years. Because
of other constraints of setbacks and things like that, by the time you factor all those things in,
engineering, roadways, and parking, we would not request and would commit to not putting
more units in there than would be allowable under the Medium Density Residential which is 240
apartment units; however, we need a high density zoning classification so that we can achieve
that because without that because of design constraints, he does not think with three story
garden style apartments were permitted under the zoning classification suggested by Staff, we
would be able to achieve the density. We would commit to not exceeding the 240 units which
Page 74
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 8
Staff is okay with; however, we would like the design ability to design buildings that would allow
us to achieve those 240 units.
Mr. Malmberg further stated that a couple of things that would suggest that you support this
position are that this is on an arterial roadway which is supportive of the high density zoning that
has been requested. There is, as noted by the Staff report, the transit services available. It
says it is not supporting commercial use; however, this property is adjacent to DSU and less
than a mile from the Acme Shopping Center and Dover Downs. It is a logical place for this use
of the property and for construction and design we think it is important to have the High Density
Residential zoning that we have requested.
Mr. Holt questioned that they would rather go with the High Density than the Medium Density is
that correct? Responding to Mr. Holt, Mr. Malmberg stated that the request is for RG-5 and was
surprised that it was not supported by the Planning Staff. Responding to Mr. Malmberg, Mrs.
Townshend stated that the height issues would prevent, without a PND, clustering of the density
in a taller building.
Mr. Friedman stated that his understanding in reading that the Staff’s concerns were primarily
the environmental constraints and those are defined specifically as the cliff drop off and the
wetlands that reside below. Responding to Mr. Friedman, Mrs. Townshend stated yes, these
were the concerns.
Mr. Friedman stated that with regards to the limited street access, he did not quite understand
that. Are we talking about percentage, could you explain further? Responding to Mr. Friedman,
Mrs. Townshend stated that they are not public streets so there is quite a bit that needs to be
figured out.
Also responding to Mr. Friedman, Mr. Koenig stated that not to mention that they are not public
streets; however, there is property that is not actually in City limits so there is property that is
located in Kent County. These are paper streets that were platted many, many years ago and
in some cases, there may be encroachments on those platted paper streets. The City has not
monitored this because the streets are located in Kent County. There are a number of
challenges related to access to the property that would have to be resolved for future
development.
Mr. Hemmig questioned did you do the calculations for how many units you could build with
Medium Density versus High Density? Responding to Mr. Hemmig, Mr. Malmberg stated that
Medium Density is easy to figure out; it is eight (8) units per acre and there is thirty (30) acres so
it is 240 units. High density he does not even know if there is a density limit.
Also responding to Mr. Hemmig, Mrs. Townshend stated that High Density is based on the
minimum square footage which is 900 square foot per unit; however, the arithmetic only gets
you so far because as Mr. Malmberg indicated, once you factor in certain things like parking.
Interjecting Mr. Malmberg stated that his figure would be forty-five (45) units per acre and unless
we are going to build a skyscraper that is not going to happen. He would be willing to commit to
not creating more than the 240 units which would be under the Medium Density category. It just
gives us more design flexibility for buildings that could actually get to that point if we are down to
a useable twelve (12) acres.
Mrs. Townshend stated that we cannot, through the zoning process, restrict any commitments
made during the rezoning process. It cannot be enforced as conditions on a development
application. That becomes the challenge; however, again the site restraints are going to push
Page 75
Z-11-02 Lands of College Road Management, LLC
Report to City Council - April 11, 2011
Page 9
down the density from a theoretical density of forty-five (45) units because the land area is not
there to support it once you take out the restrained portions. The other option would be under
the Medium Density zoning classification a Planned Neighborhood Design could be
implemented to allow for the bulk standard waivers to get that density higher up.
Mr. Hemmig stated that we essentially have a situation where we have to take Mr. Malmberg’s
word for it, if we allow High Density that he will not exceed 240 units.
Mrs. Townshend stated that you can do two public hearings at once consecutively since we
discussed both matters.
Mr. Hemmig opened the public hearing for MI-11-01 Comprehensive Plan Amendments 2011
(Part B) and after seeing no one wishing to speak closed the public hearing.
Mr. Hemmig opened a public hearing for Z-11-02 Lands of College Road Management, Inc.,
Kent Storage Facilities Inc & Loralex Company, LLC at Railroad Avenue.
Mr. James Galvin – Staff Member of Kent County MPO – Stated that in the comments that
they made on the rezoning application, which we technically do not do, one of the things that we
are concerned about is maintaining rail access into the City and County. The fact that this
property is immediately adjacent to the rail line and they share a right-of-way, the MPO would
like to see some kind of buffer between the rail line and the residential units. He is not sure how
you could use the property, but something to make it part of the project so that you do not have
the immediate nuisance of the rail with the residents of the property.
Mr. Hemmig closed the public hearing after seeing no one else wishing to speak.
Mr. Hemmig stated that this is one of his major concerns as well and apartment complex right
next to the railroad tracks. He has the occasion to be in JP Court quite often and that is a brick
building of masonary construction and it is a good 100 feet away from the railroad tracks and
that building shakes like crazy when a train comes through even at a very slow speed. He does
not know why anyone would want to live in an apartment right next to railroad tracks. Will you
be able to meet the MPO’s recommendation of the buffer?
Responding to Mr. Hemmig, Malmberg stated that he assures you that it would be in both the
uses best interest as well as the railroads best interest to give as much separation as possible
for the reasons that you just stated.
Mr. Friedman moved to forward to City Council approval of MI-11-01 Comprehensive Plan
Amendments 2011(Part B) from Industrial to Residential High Density, seconded by Mr. Tolbert
and the motion was unanimously approved 8-0 with Colonel Welsh absent.
Mr. Friedman moved to forward to City Council approval of Z-11-02 Lands of College Road
Management, Inc., Kent Storage Facilities, Inc., and Loralex Company, LLC at Railroad Avenue
with the four (4) parcels of lands associated with it and rezoning it to RG-5 as requested by the
applicant, seconded by Mr. Nichols and the motion was unanimously carried 8-0 with Colonel
Welsh absent.
Page 76
City of Dover Application No.: Z-11-02
Department of Planning & Inspections
IO
M IO
Site
AD
O
E
R
EG R-20
M LL
O
M HO C
RG-5 IS AS
O
J
E N
E
RM-2 ST
R ST
UA R
RE E
SQ EE
M E T
T
EG
LL
O
C
RG-2
CPO IO
IO
ROS
R-20 R-20
RM-1
R-8
CPO R-20 ROS
RG-5 R-20
CPO
Plan Title: College Road Management, LLC
Location: Railroad Ave.
Legend
Plan Type: Rezoning Dover Parcels
Tax Parcels: ED-05-067.00-02-56.00
ED-05-067.00-02-55.00, ED-05-067.00-02-54.00, and Dover Boundary
ED-05-067.00-02-53.00 Zoning
Current Zoning: IO
Propsoed Zoning: RG-5 Corridor Overlay Zone
Owners: Kent Storage Facilities, LLC., Loralex Co, LLC
and College Road Management, LLC
Date: 1-13-11 0 300 600 1,200 Feet
«
Page 77
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: FEBRUARY 3, 2011
APPLICATION: LANDS OF COLLEGE ROAD MANAGEMENT INC., KENT
STORAGE FACILITIES INC. & LORALEX COMPANY, LLC
AT RAILROAD AVENUE
FILE #: Z-11-02
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER
1. Our office has no objection to the rezoning of tax parcels ED05-067.00-02-53.00-000, ED05-067.00-02-54.00-000,
ED05-067.00-02-55.00-000 and ED05-067.00-02-56.00-000.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None.
WATER / WASTEWATER
1. Should this site be redeveloped, which includes modifications to the use, the applicant / developer will be responsible
for all costs associated with providing the appropriate service to this site based upon the use including any necessary
system upgrades or extensions. The appropriateness and adequacy of water and sewer services and meters will be
assessed at that time. Should the existing services no longer be required based upon the proposed use, they must
be properly abandoned at the mains in accordance with all City of Dover Public Utilities Department standards and
specifications.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 78
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: February 3, 2011 T
===============================================================
APPLICATION: Lands of College Road Management Inc. Kent Storage Facilities Inc.
& Loralex Company, LLC at Railroad Avenue
FILE#: Z-11-02 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
• The Department has no comments for the proposed rezoning.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. The department will require the applicant to provide the proper forms, fees, and plans
in order to be issued an entrance permit.
2. According to Kent County Classification Maps, KCR 91 (College Road) is classified
as a minor arterial road, which requires an 80-foot wide right of way (40-feet from
the centerline). The department will require a Right-of-Way dedication for public
use.
3. A Traffic Impact Study (TIS) will be required if the proposed development exceeds
50 VPH or 400 VPD.When the study is completed, DelDOT will review it and send
recommendations for the improvements to the City. The improvements contained in
Page 79
the study will be implemented by the developer per DelDOT's discretion. Please,
contact Mr. Troy Brestel at (302) 760-2167 or e-mail: Troy.Brestel@state.de.us to set
up a scoping meeting for this project.
4. If the proposed development exceeds 200 ADT, a pre-submittal meeting will be
required prior to submitting plans for review.
5. A Traffic Generation Diagram will need to be included turning movement counts,
frontage road posted speed limit, site ADT, truck percentage for the site, existing
frontage road AADT from DelDOTs Traffic Summary 2009, Total ADT (site ADT +
frontage road AADT), and reference the ITE Manual, 8th Edition. Right turn lane,
left turn lane or bypass lane warrants and pavement sections will be determined using
the site ADT and total AADT.
6. Offsite improvements will be required in order to prevent accumulation of vehicles
on the railroad track cause by the left turning traffic into the site.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 80
Dover/Kent
CITY OF DOVER
County
DEVELOPMENT ADVISORY COMMITTEE Metropolitan
APPLICATION REVIEW COMMENTARY
Planning
Organization
D.A.C. MEETING DATE: February 10, 2011
APPLICATION: Lands of College Road Management, et. al., at Railroad Ave
FILE #: Z-11-02 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Jim Galvin, AICP PHONE #: (302) 387-6030
The Dover/Kent County MPO has participated in the State’s Preliminary Land Use Services (PLUS) process for
several months. The MPO requested the opportunity to bring the recommendations on issues of our concern to the
City as well. The MPO will limit comments to projects to development proposals and applications that may lead to
new development. Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by
shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and
pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all
applications, not to be waived.
City of Dover Planning Commission 2/22/2011
Project Review
Z-11-02 Lands of College Road Management, et. al., at Railroad Ave
The Dover/Kent County MPO typically does not comment on rezoning. This rezoning, however,
is adjacent to the Railroad right-of-way (ROW) and tracks used to transport freight to and
through Dover and Kent County. A concern of the MPO is to preserve the railroad as a method
of transporting goods and materials in the area. One of the most threatening issues is the
construction of residential developments adjacent to the ROW and then the noise and safety
issues inherent with trains . In an attempt to lessen the interaction, the MPO requests no
residential lots be created within 100 feet of the ROW. We further request no activity be
promoted within the 100 feet buffer.
This is the standard for Dover created with the subdivision of Eden Hill Farm to preserve
railroad access through the community while lessening the potential impacts on residents.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Page 81
FINAL READING
CITY OF DOVER
PROPOSED ORDINANCE #2011-04
1 AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
2 CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
3 AT GROVE STREET AND RAILROAD AVENUE
4 WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property within
5 the limits of the City of Dover; and
6 WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use of
7 property described below from M (Manufacturing Zone) to RG-5 (General Residence Zone for
8 Mid-Rise Apartments).
9 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
10 DOVER, IN COUNCIL MET:
11 1. That from and after the passage and approval of this ordinance the Zoning Map and Zoning
12 Ordinance of the City of Dover have been amended by changing the zoning designation from
13 M (Manufacturing Zone) to RG-5 (General Residence Zone for Mid-Rise Apartments) on
14 that property located at Grove Street and Railroad Avenue, north of College Road and east
15 of the railroad corridor and Railroad Avenue, consisting of four (4) parcels of land totaling
16 30.78+/- acres, owned by College Road Management, Inc.; Kent Storage Facilities, LLC; and
17 Loralex Company, LLC.
18 (Tax Parcels: ED05-067.00-02-53.00-000, ED05-067.00-02-54.00-000, ED05-067.00-02-55.00-000, and
19 ED05-067.00-02-56.00-000; Planning Reference Z-11-02)
20 ADOPTED: *
21 S:\PACKETS\2011\Council\04-11-2011\A. Proposed Ordinance 2011-04 - Rezoning of Property Located at Grove Street and Railroad Avenue- FINAL Rdg.wpd
22 Actions History
23 April 11, 2011 - Proposed Public Hearing/Final Reading - Council
24 March 21, 2011 - Review by Planning Commission
25 February 28, 2011 - Public Hearing Rescheduled - Council
26 January 24, 2011 - First Reading - Council
27
Page 82
PETITION TO AMEND AND ZONING DISTRICT
Update of Report to
Dover City Council
April 11, 2011
Applicants/Owners: CRM Mid-Atlantic, LLC
Sun Trust Bank
Address: 101-405 DoveView Drive, Dover
Location: North side of Forrest Avenue, west of Saulsbury Road
Tax Parcel ID #: ED-05-076.07-01-30.00-000
Size: 6.735+/- acres
Present Use: Vacant Apartment Buildings - partially constructed
Present Comprehensive
Plan Designation: Institutional
Proposed Comprehensive
Plan Designation: Residential High Density
Present Zoning: IO (Institutional/Office Zone)
COZ-1 (Corridor Overlay Zone)
Proposed Zoning: RG-5 (General Residence for Mid-Rise Apartments Zone)
COZ-1 (Corridor Overlay Zone)
Reason for Request: To allow for the development of multi-family residential
dwellings.
File Number: Z-11-03
Page 83
Z-11-03 Lands of CRM Mid-Atlantic, LLC (DoveView Apartments)
Updated Report to City Council– April 11, 2011
Page 2
This rezoning application consists of one parcel of land, of approximately 6.735 acres, owned by
CRM Mid-Atlantic, LLC. The property is currently zoned IO (Institutional and Office Zone), and
subject to the COZ-1 (Corridor Overlay Zone). The proposed zoning is RG-5 (General
Residence Zone for Mid-Rise Apartments). The subject area is located north of Forrest Avenue
(Delaware Route 8) and west of Saulsbury Road. Tax Parcel: ED-05-076.07-01-30.00-000.
The rezoning proposal is made in conjunction with a request to amend the 2008 Comprehensive
Plan, Map 12-1 Land Development Plan, to change the subject parcel from Institutional land use
classification to Residential High Density land use classification. Analysis of this request is in
the report for file MI-11-01 – 2011 Comprehensive Plan Amendments.
Existing Property:
The subject parcel was previously approved as DoveView Apartments, a Planned Neighborhood
Design – Senior Citizen Housing Option. Under the provisions of the Zoning Ordinance in
Article 3 §24 for the Planned Neighborhood Design Option, a property zoned IO (Institutional
and Office Zone) is permitted to be considered for development with the PND: Senior Citizen
Housing Option through the Conditional Use review process. The applications associated with
this project include:
C-03-08 – Approved by Planning Commission in February 2004 as FountainView PND –
Senior Citizen Housing Option
C-06-02 – Approved by Planning Commission in August 2006 as DoveView PND –
Senior Citizen Housing Option. The Planning Commission granted a one-year extension
in August 2007.
The DoveView PND – Senior Citizen Housing Option plan included 192 dwelling units in four
four-story apartment buildings. The plan as approved would include 246 parking spaces and an
overall density of 28.52 dwelling units per acre.
The City issued building permits for the four buildings that make up DoveView in late 2007 and
early 2008. Construction began on two buildings and ultimately ceased. The property went into
foreclosure and is now owned by CRM Mid-Atlantic, LLC (Sun Trust Bank). Because
construction ceased for more than one year, the site development plan associated with DoveView
has expired (Zoning Ordinance, Article 10 §2.491(a)). Site development plan approval is
required prior to initiation of any construction activity on the site, regardless of the outcome of
the rezoning application.
The subject property is located within the COZ-1 (Corridor Overlay Zone) due to its location
along Delaware Route 8 and Saulsbury Road. Any development of the site shall comply with the
requirements of this zone.
Surrounding Land Uses:
There are a variety zoning classifications and land uses surrounding the subject property.
Immediately south of the subject site, between the subject property and Forrest Avenue, are two
properties that are zoned C-2A (Limited Central Commercial Zone); one is vacant, and the other
is TD Bank. Other adjacent properties to the east between the subject site and Saulsbury Road
are zoned C-2A (Limited Central Commercial Zone) as well. Included among these is the
Walgreens Drug Store located at the corner of Forrest Avenue and Saulsbury Road.
Page 84
Z-11-03 Lands of CRM Mid-Atlantic, LLC (DoveView Apartments)
Updated Report to City Council– April 11, 2011
Page 3
The property located to the north of the proposed site is zoned IO (Institutional and Office Zone)
and is the location of the Academy of Dover (school). Immediately west of the site is the Modern
Maturity Center, which is zoned IO (Institutional and Office Zone).
Comprehensive Plan:
In the 2008 Comprehensive Plan, the Land Development Plan (Map 12-1 as amended, dated
11/23/2009) recommends that this property be used for Institutional Uses. As previously stated,
the rezoning request is associated with a request to amend the 2008 Comprehensive Plan to
reflect the land use on Map 12-1 as Residential High Density. The requested zone is consistent
with the requested land use classification, but not with the existing land use classification.
The Land Development Plan (Chapter 12) of the 2008 Comprehensive Plan states the following
with regard to high density residential development:
The Comprehensive Land Development Plan recommends that high density
residential be dispersed throughout the City along arterial roadways in close
proximity to other high-density residential uses, schools, neighborhood commercial
areas, transit service, and other compatible non-residential land use areas. High
density residential development is also appropriate in some areas of the downtown,
most of which are shown as mixed use on the Land Development Plan.
The subject site is located off Saulsbury Road and Delaware Route 8, both of which are
identified as Urban Minor Arterials in the 2008 Comprehensive Plan. It is also within proximity
(walking distance) to schools (Booker T. Washington Elementary School, William Henry Middle
School, and the Academy of Dover), commercial areas (including the TD Bank and Walgreens
Drug Store on adjacent parcels and the Gateway West Shopping Center to the south, across
Forrest Avenue), transit service, and other services (including medical offices).
Request for RG-5 (General Residence Zone for Mid-Rise Apartments)
Within the RG-5 Zone, the following uses are permitted: one-family detached dwellings; mid-
rise apartments; public buildings, structures and uses; raising of field and garden crops,
vineyards and orchards, and nurseries. See Zoning Ordinance, Article 3 §5 and referenced
sections.
According to Article 12 of the Zoning Ordinance, the definition of mid-rise apartments is as
follows:
Mid-rise apartment: Multiple dwellings where individual dwelling units share a
common outside access, and elevators serve each floor. The dwelling units share a
common lot area, which is the sum of the required lot areas of all dwelling units
within the building.
The following is a summary of the bulk standards, as specified in Article 4, Section 4.6. The
Zoning Ordinance defines Multiple Dwellings as “A building, or portion thereof, containing
more than two dwelling units.”
Page 85
Z-11-03 Lands of CRM Mid-Atlantic, LLC (DoveView Apartments)
Updated Report to City Council– April 11, 2011
Page 4
For Multiple Dwellings:
Minimum required:
Lot area (sq. ft.) 900 per dwelling unit
Lot width (ft.) 100
Lot depth (ft.) 125
Front yard (ft.) 25
At the ground level or at any setback level, one-sixth of the height of the
nearest outside wall of the building measured in each case from the
Side yard (ft.)
average level of the finished grade along the side of the building, but in no
case less than 25 feet.
At the ground level or at any setback level, one-sixth of the height of the
nearest outside wall of the building measured in each case from the
Rear yard (ft.)
average level of the finished grade along the rear of the building, but in no
case less than 25 feet.
Off-street parking
2/Du
spaces
Accessory
commercial uses 1 per employee or 1 per 300 sq. ft. of floor area, whichever is greater.
parking spaces
25% of the lot area shall be devoted to open area, not including parking
Open space
areas.
Maximum permitted:
Building height
Stories 6
Feet 70
Recommendation of the Planning Staff and Planning Commission:
This request is to rezone land from IO (Institutional and Office), subject to the COZ-1 (Corridor
Overlay Zone) to RG-5 (General Residence Zone for Mid-Rise Apartments), subject to the COZ-
1 (Corridor Overlay Zone). This request is made in conjunction with a request to amend the
2008 Comprehensive Plan, Map 12-1 Land Development Plan, as it relates to this property. The
approval of this rezoning request is contingent upon the approval of the associated amendment to
the 2008 Comprehensive Plan.
As stated in the report for MI-11-01 – 2011 Comprehensive Plan Amendments, staff supports the
land use classification change from Institutional to Residential High Density, and the associated
rezoning of the subject property from IO (Institutional and Office) to RG-5 (General Residence
Page 86
Z-11-03 Lands of CRM Mid-Atlantic, LLC (DoveView Apartments)
Updated Report to City Council– April 11, 2011
Page 5
Zone for Mid-Rise Apartments). Staff believes that the rezoning and amendment to the
Comprehensive Plan are consistent with the policies stated in the 2008 Comprehensive Plan
regarding location of high density residential uses. As previously stated, the subject property is
within proximity to a variety of goods and services, including transit service, schools, places of
employment, commercial uses, and other supporting services. Additionally, one of the challenges
typically encountered when considering high density residential development is the resistance
from residential neighbors living in lower density residential developments. This location is not
directly adjacent to other, lower density residential development that would generate these types
of conflicts.
All Staff recommendations were made prior to the public hearing before the Planning
Commission. Following a public hearing on February 22, 2011, where several members of the
public spoke in opposition of the rezoning request, the Planning Commission voted to
recommend in favor of the proposed amendments to the 2008 Comprehensive Plan with six
members voting in favor and one member voting against the request.
On March 14, 2011, City Council held a public hearing on the proposed rezoning application.
Following public testimony expressing concern about the required cross access between the
Modern Maturity Center and the subject site if apartments on the site were not to be restricted to
senior citizen residents, the City Council deferred action on this request until the Planning
Commission renders a decision on the Modern Maturity Center’s request to remove the
requirement for cross access between the sites.
Following a public hearing before the Planning Commission on March 21, 2011, the Planning
Commission voted to remove the requirement for a vehicular cross access between the Modern
Maturity Center and the DoveView site. This vote was approved with 7 members voting in favor,
on member voting in opposition, and one member absent. The Planning Commission retained
the requirement that the Modern Maturity Center provide a cross access between the sites for
golf carts and pedestrians.
Page 87
Z-11-03 Lands of CRM Mid-Atlantic, LLC (DoveView Apartments)
Updated Report to City Council– April 11, 2011
Page 6
Excerpt from DRAFT Minutes of the February 22, 2011 Planning Commission Meeting
(Minutes scheduled for adoption on March 21, 2011)
Z-11-03 DoveView Apartments at 101-405 DoveView Drive – Public Hearing and Review for
Recommendation to City Council on a rezoning application consists of one parcel of land totaling
of 6.735 acres ±. The property is zoned IO (Institutional/Office Zone) and subject to the COZ-1
(Corridor Overlay Zone). The proposed zoning is RG-5 (General Residence Zone for Mid-rise
Apartments) and subject to the COZ-1 (Corridor Overlay Zone). The property is located on the
north side of Forrest Avenue (Route 8) just west of the Saulsbury Road intersection. The owner of
record is CRM Mid-Atlantic, LLC and SunTrust Bank. Property Addresses: 101-405 DoveView
Drive. Tax Parcel: ED05-076.07-01-30.00-000. Council District 1. Ordinance #2011-05.
Representatives: Mr. Gregg Moore, Becker Morgan Group, Inc.
Mrs. Townshend stated that this application is similar to the previous application that you just saw in terms of
surrounding Land Uses. There are other properties adjacent to this property that are zoned C-2A (Limited Central
Commercial), one is vacant, the other is TD Bank, Walgreens Pharmacy, and another parcel that is zoned C-2A as
well. To the north of this site is property that is zoned Institutional and Office and is the location of The Academy
of Dover which is a charter school. Immediately west of the site is the Modern Maturity Center where you heard
people associated with the Modern Maturity Center speaking. In terms of the Comprehensive Plan in order for this
to go through, it is dependent upon that plan change. There is language in the Comprehensive Plan that addresses
High Density. We have included the bulk standards for what RG-5 would include. She would state for the record
that the Site Development Plan associated with DoveView has expired and those approvals were specifically for
senior housing; therefore, the Site Plan will have to come back for consideration at that time.
Mr. Hemmig stated for clarification if the Land Use Classification change fails to pass City Council, then this
rezoning would become null and void. Responding to Mr. Hemmig, Mrs. Townshend stated that City Council will
be made aware that they go together and if they approve one the other will also need to be approved unless they go
back and reconsider the first one.
Mr. Moore stated for clarification that he is aware that there was a tax bill that was due on this parcel of land that
had not been paid by the developer. The bank was advised by its legal counsel that upon the deed being recorded,
they would pay the bill. That bill has now been paid.
Colonel Welsh stated that to clarify a point for those who testified previously from the public, this is only a
recommendation for a rezoning application. For those who had concerns regarding connectivity with the Modern
Maturity Center, that would not be considered until they come forward with a Site Plan for the apartments.
Mr. Moore stated that they will reach out to the Modern Maturity Center with them separately. Now we have the
chance to make that connection before we file a plan before the Commission so that we can talk to them about what
we plan to do.
Mr. Hemmig opened a public hearing.
Mr. Leonard Iacono – Stated that he would like to make a comment about the whole aspect of this project. He
challenges the bank to produce a market study that states that the need for senior housing is not required. He also
suggests, as a major developer in Dover and one of the largest apartment owners here, no one has ever contacted
him regarding the ability of taking the project over and developing a senior housing project. If the bank contacted
someone, he has no idea who they contacted. He still does not understand the connection between the fact that the
City already changed it from a condominium project to a senior housing project and is now changing it back. He
just does not understand the whole flow.
Responding to Mr. Iacono, Mrs. Townshend stated that it has always been senior housing. Changing it to a
condominium project is a form of ownership not a unit type. Essentially, what we have seen from the beginning has
always been apartments as a unit type. Initially, the intent in that they would be condominiums for sale and then it
Page 88
Z-11-03 Lands of CRM Mid-Atlantic, LLC (DoveView Apartments)
Updated Report to City Council– April 11, 2011
Page 7
changed to apartments; however, from a zoning standpoint there is no difference. The Zoning Ordinance, in terms
of the housing style, specifically states multi-family; it does not state multi-family condominium or multi-family
rental.
Mr. Iacono stated that it would be his error because he was under the impression that it started off initially as a
condominium project and then went back to the City to request that it be a rental property and specifically a senior
housing project. Responding to Mr. Iacono, Mrs. Townshend stated that it was “senior” from the beginning and was
initially intended to be condominiums. They asked if they needed approval; however, Staff stated that approval was
for senior housing and not necessarily the ownership or rental aspect of it.
Mr. Iacono stated that if the bank is still interested in considering a senior housing aspect; he would be interested.
Mrs. Carolyn Fredericks – Stated that her concern is that she does not know what the timeframe is for the Site
Plan and when it would come back; however, the condition of her receiving a Certificate of Occupancy for her
building was to build that connection. She is going to be ready to obtain a Certificate of Occupancy by the first of
April because their building is almost completed. She is unsure how long the process would take before they would
come back with their Site Plan.
Responding to Mrs. Fredericks, Mrs. Townshend stated that in terms of the Modern Maturity Center at this point, it
is part of their Site Plan. They have received the request from the Modern Maturity Center to come to the Planning
Commission which will happen next month with their request to remove that interconnection cross access.
Colonel Welsh stated that to throw out an opinion he stated that they may want to think about this for awhile
because he really thinks that it would be mutually beneficial for both of you to have that interconnectivity both for
bringing new people into the Modern Maturity Center and having that use. Responding to Colonel Welsh, Mrs.
Fredericks stated that they would discuss this issue next month as it is a major safety issue.
Mr. Nichols questioned when DoveView was proposed to be built, wasn’t interconnectivity there at one time and
they wanted to bring the road across the ditch over to that point and they abandoned the road idea; however, there
would still be a small path across there to get back to the Modern Maturity Center? Responding to Mr. Nichols,
Mrs. Townshend stated that there were two things. One, there was a small pedestrian golf cart type access between
the two properties. There was also, at that point, even though there was not anything on the Modern Maturity side
there was the requirement to provide a cross access easement on the DoveView side; however, they were not
required to build it until something happened at the Modern Maturity Center. When Modern Maturity Center came
through for their expansion that is currently underway, the location where the interconnection was put at DoveView
was something that caused them (Modern Maturity Center) concern. It was at their request that the interconnection
in terms of the location on their property was moved further to the front of the property. When DoveView comes in
or the vacant parcel or anything adjacent we will have to determine how that connects with the Modern Maturity
piece if it stays.
Mr. Nichols further stated that this area was originally shifted he believes to the back. Responding to Mr. Nichols,
Mrs. Townshend stated yes and now has been shifted to the front because of concerns of traffic going through the
parking lot and the ability of going around the front of the building.
Mr. Hemmig questioned that the Modern Maturity Center’s Certificate of Occupancy is tied to completion of the
interconnectivity, has that been built? Responding to Mr. Hemmig, Mrs. Fredericks stated that they have not built it
yet and our building is almost completed. When they finish with their building, they cannot obtain a Certificate of
Occupancy until that interconnectivity has been completed.
Mr. Hemmig further stated for clarification, this zoning is taking the property from I/O to RG-5. Under the I/O we
were able to do a Conditional Use for senior housing. Under the RG-5 can it still be senior housing? Responding to
Mr. Hemmig, Mrs. Townshend stated that they could voluntarily age restrict it under RG-5 or they could come back
with another senior citizen PND under the RG-5. RG-5 does not preclude it from being senior housing; it just does
not require it. Under the I/O, the residential uses aside from the senior citizen PND are prohibited.
Page 89
Z-11-03 Lands of CRM Mid-Atlantic, LLC (DoveView Apartments)
Updated Report to City Council– April 11, 2011
Page 8
Colonel Welsh moved to forward to City Council recommendation of approval of Z-11-03 DoveView Apartments
located at 101-405 DoveView Drive from I/O Institutional Office subject to the Corridor Overlay Zone (COZ-1) to
RG-5 General Residence Zone for mid-rise apartments and subject to the Corridor Overlay Zone (COZ-1), and for
reasons stated in the Staff Report and general discussion this evening, seconded by Mr. Nichols and the motion was
carried 6-1 with Mr. Friedman and Mr. Holt absent and Mr. Ambruso opposed.
Page 90
City of Dover Application No.: Z-11-03
Department of Planning & Inspections
R-8 R-
ROS CPO
8
E T
TRE IPM
RA S
CLA
RM-1
NT E
IVE
Y DR
COL
ON B I CE
R-8
NN C-2A
ROS L
RM-1 BO
IA
U LE VA R D
PEW C-3
TER RG-2
RM-1 IO
R-8 CO U C-2A
RT
R
GEO
CPO
ING
RG-2 RG-2
ASH
GE W
Site
CARVER ROAD
RGO
IO
E
ANDREW D RIV D RG-3
TON CPO C-1A
RG-2
C-1A RIVE C-2A
RM-2
C-2A
FOREST STREET
AD
SAULSBURY RO
FORREST AVENUE HARTLY ROAD
E
BERTRAND DRIV
CPO
C-2A EET C-2A
E
GIBBS DRIV
BENNINGTON STR
RG-1
CPO RG-1
ET
LINCOLN STRE
RG-2 C-2A CPO R-8
REECE STREET
RG-2 RG-1 R-
SC-2 8
FARMVIEW DRIVE R-8
RG-1
RG-2
RG-1 RG-1
RG-1
E
ROS HAYES DR IV
IPM CPO
Plan Title: DoveView
Location: 101-405 Doveview Dr.
Plan Type: Rezoning Legend
Tax Parcel: ED-05-076.07-01-30.00
Current Zoning: IO, COZ-1 Dover Parcels
Propsoed Zoning: RG-5, COZ-1 Zoning
Owner: CRM Mid-Atlantic, LLC
Sun Trust Bank Corridor Overlay Zone
Date: 1-13-11
0 300 600
« 1,200 Feet
Page 91
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: FEBRUARY 3, 2011
APPLICATION: DOVEVIEW APARTMENTS, 101-405 DOVEVIEW DRIVE
FILE #: Z-11-03
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER
1. Our office has no objection to the rezoning of tax parcels ED05-076.07-01-30.00-000.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER
1. The utilities on this site have already been installed based upon the originally approved layout. As such, it is preferred
that changes to the site be planned accordingly. Should this site be redeveloped, which includes modifications to the
use or layout, the applicant / developer will be responsible for all costs associated with providing the appropriate
service to this site based upon the use including any necessary system upgrades, extensions or relocations. The
appropriateness and adequacy of water and sewer services and meters will be assessed at that time. Should the
existing infrastructure no longer be required based upon the proposed use, it must be properly abandoned in
accordance with all City of Dover Public Utilities Department standards and specifications.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Page 92
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: February 3, 2011 T
===============================================================
APPLICATION: Doveview Apartments at 101-145 Doveview Drive
FILE#: Z-11-03 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. DelDOT has no comments for the proposed rezoning.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
• A Traffic Impact Study (TIS) will be required if the proposed development exceeds 50 VPH or
400 VPD.When the study is completed, DelDOT will review it and send recommendations for the
improvements to the City. The improvements contained in the study will be implemented by the
developer per DelDOT's discretion. Please, contact Mr. Troy Brestel at (302) 760-2167 or e-mail:
Troy.Brestel@state.de.us to set up a scoping meeting for this project.
• If the proposed amended subdivision will generate fewer than 2000 trips per day or less than 200
vehicles in any hour of the day, DelDOT will allow payment towards an Area-Wide Study Fee, in
lieu of a TIS. The Area-Wide Study Fee, calculated as $10 per daily trip, would be payable to
DelDOT prior to the re-issuance of a Letter of No Objection. Payment of it would exempt the
developer from the need to do a TIS, but would not exempt them from participation in off-site
improvements or the need to do a Traffic Operational Analysis if one is required in the re-review
of their entrance plans. If the developers would like to pay the fee in lieu of doing a TIS, the
developer should contact me at (302) 760-2145.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Page 93
FINAL READING
CITY OF DOVER
PROPOSED ORDINANCE #2011-05
1 AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
2 CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
3 AT 101-405 DOVEVIEW DRIVE
4 WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property within
5 the limits of the City of Dover; and
6 WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use of
7 property described below from IO (Institutional and Office Zone) and subject to COZ-1 (Corridor
8 Overlay Zone) to RG-5 (General Residence Zone for Mid-Rise Apartments) and subject to COZ-1
9 (Corridor Overlay Zone).
10 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
11 DOVER, IN COUNCIL MET:
12 1. That from and after the passage and approval of this ordinance the Zoning Map and Zoning
13 Ordinance of the City of Dover have been amended by changing the zoning designation from
14 IO (Institutional and Office Zone) and subject to COZ-1 (Corridor Overlay Zone) to RG-5
15 (General Residence Zone for Mid-Rise Apartments) and subject to COZ-1 (Corridor Overlay
16 Zone) on that property located at 101-405 Doveview Drive (on the north side of Forrest
17 Avenue (Route 8) just west of the Saulsbury Road intersection), consisting of 6.735+/- acres,
18 owned by CRM Mid-Atlantic, LLC and SunTrust Bank.
19 (Tax Parcel: ED05-076.07-01-30.00-000; Planning Reference: Z-11-03)
20 ADOPTED: *
21 S:\PACKETS\2011\Council\04-11-2011\A. Proposed Ordinance 2011-05-Rezoning of Property Located at 101-405 Doveview Drive - Final Rdg (revised) (04-11-2011).wpd
22 Actions History
23 April 11, 2011 - Proposed Final Reading - Council
24 March 21, 2011 - Reconsidered by the Planning Commission
25 March 14, 2011 - Public Hearing - Deferred by Council and Referred Back to the Planning Commission
26 February 22, 2011 - Review - Planning Commission
27 January 24, 2011 - First Reading - Council
28
29
Page 94
SPECIAL PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE
A Special Parks, Recreation, and Community Enhancement Committee meeting was held on
March 24, 2011, at 10:00 a.m. with Chairwoman Russell presiding. Members present were
Dr. McGlumphy (arrived at 10:11 a.m.) , Mr. Ruane (arrived at 10:29 a.m.) , Mrs. Horsey, and Mr. Lewis.
AGENDA ADDITIONS/DELETIONS
Mrs. Horsey moved for approval of the agenda, seconded by Mr. Lewis and unanimously
carried.
Community Development Block Grant (CDBG) Application Review
Mrs. Tracey Harvey, Community Development Manager, noted that members would be serving as
the Community Development Block Grant (CDBG) Review Panel for the CDBG Applications for
Fiscal Year 2011. As such, members were provided with a list of applicants, staff reports
summarizing each application, a CDBG Interview Schedule, a breakdown of federal resources
available for use, the total amount of grant funds requested, CDBG scoring criteria, and a
2011 CDBG Review Panel Scoring Sheet for each applicant. She requested that members
summarize their evaluation of each application on the CDBG Grant Application Review Sheet and
provide a score based on the information presented. Mrs. Harvey explained that the numbers in
parenthesis next to each measure indicate the maximum score for a given category and that the
maximum total points is 100.
Mrs. Harvey advised members that the total amount of grant funds available for activities is
$228,406 and explained the allocation requirements of the grant, as follows:
CDBG Funds Allocation $270,000
Anticipated Program Income $ 15,507
Total Grant Allocation $285,507
20% of the grant must be allocated for $285,507
Program Administration x.20
$57,101
Grant Funds Available for Activities $228,406
Total Grant Funds Requested by Applicants $540,347
Mrs. Harvey cautioned that, according to CDBG requirements, funds awarded for public service
activities cannot exceed 15% of the total grant allocation ($42,826).
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that until the federal budget process is complete, the funding level of the City’s CDBG allocation
is uncertain. She noted that the City’s representative from the Department of Housing and Urban
Development suggested using the City’s FY 2009 allocation for budgeting purposes.
Mrs. Townshend stated that members should understand that subgrant funding levels may need to
be adjusted after Congress adopts a final budget.
Page 95
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2011 PAGE 2
By unanimous consent (Mr. Ruane absent during this portion of the meeting) , members agreed that they
would abide by a procedure adopted in previous years whereby applications that receive fewer than
70 points in the scoring process would be removed from consideration.
Oral Presentations
Each applicant was provided an opportunity to make oral presentations before the committee, as
follows:
Dover Interfaith Mission for Housing
Ms. Jeanine Kleimo, Chair, Dover Interfaith Mission for Housing (DIMH), reviewed a grant
application in the amount of $46,000. She explained that DIMH is an interfaith community
organization which provides shelter, meals, and assistance to homeless men from the greater
Dover community. Ms. Kleimo indicated that DIMH has opened a shelter at 684 Forest Street in
Dover which can accommodate up to 36 lodgers. She stated that the 4,800 square-foot building is
leased from the Downtown Dover Partnership and was renovated using a previous $60,000 CDBG
award from the City of Dover. Ms. Kleimo noted that all shelter guests are assessed for counseling,
treatment, and employment needs and referrals are made to local agencies that provide for mental
health and addiction counseling, and social services. She advised members that the shelter program
is one of Dover's largest volunteer efforts and is well-supported and accepted by the community.
Ms. Kleimo stated that DIMH’s grant request is for operating funds for the building, including utility
and lease costs.
In response to Mr. Lewis, Ms. Kleimo stated that very few shelter guests return for
additional services, estimating that approximately 15-20 of the 400 individuals served were
returnees. She noted that these guests were granted an additional 30-day stay and provided further
counseling. She reiterated that the goal of the DIMH is to shelter and feed men and restore them as
productive members of the community.
First State Resource Conservation and Development Council
Mr. Frederick Traute, Manager, Home Repair Project, First State Resource Conservation and
Development Council, Inc. (RC & D) reviewed a grant application, in the amount of $50,000, for
funding for the organization’s Emergency Home Repair Program. He explained that this program
provides assistance to low-income homeowners to eliminate conditions in their homes that are an
immediate threat to the occupants’ health, safety, or security. Mr. Traute noted that RC & D
provides materials and volunteers or contractors to complete repairs with no cost to the homeowner.
He emphasized that these repairs are much needed and that receipt of the organization’s services
is often the occupant’s last resort before becoming homeless. Mr. Traute explained that, if the
CDBG funds are secured, RC & D expects to carry out repairs on up to 20 low-income,
owner-occupied homes in the City over the next 12 months and plans to average three (3)
completions per quarter.
In response to Mrs. Russell, Mr. Traute indicated that current program guidelines permit RC & D
to spend up to $5,000 per year on homes. He emphasized that RC & D is not an ongoing
maintenance program and that staff encourages owners to take responsibility for maintaining their
homes in good repair after services are provided.
Page 96
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2011 PAGE 3
Connections Community Support Program
Mr. Chris Devaney, Vice President of Operations, and Mr. Brad Milton, Director of Homeless
Program, Connections Community Support Programs, Inc. (Connections), reviewed a grant
application in the amount of $20,000. Mr. Devaney explained that Connections was founded in
1985 primary medical, mental health and substance abuse treatment, employment, and housing
opportunities and to help individuals and families receiving services to become accepted and
productive members of their communities. He noted that CDBG funds would be used to increase
homeless shelter capacity in Dover by providing motel vouchers for homeless individuals and
families who have no other immediate housing alternatives.
Mr. Devaney stated that Connections also proposes to use CDBG funds to offer an alternative to
emergency shelter during the coldest nights of the year by operating a homeless café in the City from
December 15, 2011 through March 15, 2012, replicating a similar Connections program in
Wilmington. He noted that this facility would serve individuals who are unwilling or unable to stay
in traditional shelters due to fear, mental health problems, or other barriers. Mr. Devaney noted that
it is proposed to use Connections’ Dover Homeless Outreach Center, which currently provides
daytime outreach services for the homeless, for this purpose. He stated that this facility is located
at 621 W. Division Street.
In response to Mr. Ruane, Mrs. Townshend indicated that the current zoning of the Division Street
property would not permit use as a homeless café. Mr. Devaney stated that Connections would be
willing to consider another property owned by the organization, located at 696 S. Bay Road, as an
alternative location.
Mr. Ruane suggested that Connections staff explore the possibility of linking services with the
Dover Public Library, noting that the Library has an employment counselor and could also benefit
from outreach efforts made to the homeless in the area.
Diamond State Community Land Trust
Mr. Van Temple, Executive Director, Diamond State Community Land Trust (DSCLT), reviewed
a grant application in the amount of $40,000. Mr. Temple explained that DSCLT was founded in
2006 to create permanent, affordable housing for individuals who are 60% below the area median
income. He noted that, under the DSCLT model, homeowners purchase the home; however, DSCLT
retains ownership of the land. Mr. Temple indicated that DSCLT clients sign 99-year renewable
leases for exclusive rent of the land for a set, below-market fee. He stressed that, under this model,
DSCLT homes are made affordable for the first time buyer and for future buyers of the property.
Mr. Temple stated that CDBG funds would be used to purchase two (2) vacant, foreclosed homes
in Northwest Dover Heights, Lincoln Park, or surrounding areas for low-income families. He noted
that one (1) of the criteria for selecting homes would be the roof orientation and size, so that solar
panels could be installed to generate electricity and heat for hot water.
Mr. Temple provided members an updated economic summary for their review (Attachment #1).
Page 97
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2011 PAGE 4
Mr. Ruane requested that staff provide members a list of homes in the City that have been
rehabilitated by DSCLT.
Elizabeth W. Murphey School. Inc.
Mr. Michael Kopp, Executive Director, The Elizabeth W. Murphey School, Inc., reviewed a grant
application in the amount of $49,347. He advised members that the Elizabeth Murphey School is
a group home that serves neglected and abused homeless children. Mr. Kopp noted that the State
has requested the Murphey School to open an additional building to serve children who need
emergency placement. He stated that this building will house children as young as six (6) years of
age who are homeless and also have mental health concerns that will be addressed through school
staff and the services of other area professionals.
Mr. Kopp indicated that the cost of providing heat and moderate air conditioning to school buildings
has severely impacted the organization’s ability to serve more children and that conversion to
geothermal heating is crucial to the organization’s financial stability. Mr. Kopp advised members
that the CDBG funds will be used to provide a geothermal unit which will provide heat, hot water,
and air conditioning to a building which will accommodate children placed in the Murphey School’s
care on an emergency basis.
Downtown Dover Partnership
Mr. William Neaton, Executive Director, and Mr. Ed Perez, Coordinator, Downtown Dover
Partnership (DDP), reviewed a grant application in the amount of $42,000. Mr. Neaton explained
that CDBG funds were requested for the development of microenterprises in the Downtown Dover
area. He stated that funds would be used to provide: 1) grants, loans, loan guarantees and other
forms of financial support; 2) technical assistance, advice, and business services; 3) general support
to owners of microenterprises and persons developing microenterprises including child care,
transportation, counseling and peer support groups; and 4) training and technical assistance or other
support services to increase the capacity of small business owners.
In response to Mrs. Russell, Mr. Neaton noted that many small businesses fail due to lack of a solid
business plan, lack of funds, or lack of proper marketing. He stated that, with the use of CDBG
funds, the DDP hopes to provide assistance in these three (3) areas to microenterprises.
In response to Mrs. Russell, Mr. Perez requested that any negative reviews of the DDP be brought
to the attention of Mr. Neaton promptly so that they can be addressed.
Responding to Mrs. Russell, Mr. Neaton stated that the DDP is responsive to all prospective business
developers who approach the organization for assistance, including minorities.
In response to Mr. Ruane, Mr. Perez indicated that the Small Business Administration would provide
technical assistance to the DDP in administering a loan program. Mr. Neaton added that $25,000
in the current departmental budget has been allocated to the DDP’s Incentive and Loan Program
Subcommittee, and that guidelines and procedures for loan administration are under development.
Page 98
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2011 PAGE 5
In response to Mr. Ruane, Mr. Neaton stated that the $42,000 allocation requested would be
supplemental to the $25,000 currently budgeted for a loan program. He indicated that $28,000 of
the CDBG funds requested would be dedicated to loans and $14,000 to providing technical
assistance to loan recipients to assist them in managing their businesses.
In response to Dr. McGlumphy, Mr. Neaton stated that CDBG funds will not be used to supplant
funding granted to the DDP by the City of Dover.
In response to Mrs. Harvey, Mr. Neaton explained that staff would be responsible for providing
documentation related to job creation and retention for the life of the loan.
In response to Mrs. Horsey, Mr. Perez stated that the statistics provided regarding the percentage of
low-to-moderate income individuals to be served reflect that individuals who wish to start businesses
must qualify for loans and, therefore, typically have some capital.
By unanimous consent, the meeting recessed at 12:06 p.m. and reconvened at 12:42 p.m.
City of Dover - Streets Project
Mr. Scott Koenig, Public Services Manager/Director of Public Works, reviewed a grant application
for the City of Dover Streets Project - Concrete and Pavement Rehabilitation in the amount of
$203,000. He stated that the proposed locations for rehabilitation include South New Street,
Janes Road, and Mays Lane, noting that these locations must be confirmed with census data to
ensure that residents of these areas are on a low or moderate income census track. Mr. Koenig
explained that the proposed work on South New Street would include the removal and replacement
of old and deteriorated concrete sidewalks, curbs, and drains; however, concrete rehabilitation on
Janes Road and Mays Lane would be limited to drainage structures. He stated that the pavement
surface would be milled and repaved at all three (3) locations and accessibility improvements would
be made at all practical locations. Mr. Koenig noted that receiving CDBG funds would allow staff
to leverage additional funds for an overall City street program. He advised members that the
investment would be expected to last 15-20 years and would have an immediate and long-term
impact for residents in the area.
Mr. Ruane noted that the targeted sections of Janes Road and Mays Lane are situated in isolated and
neglected portions of the City which are not likely to receive State support.
Housing Rehabilitation Program
Mrs. Tracy Harvey, Community Development Manager, reviewed a grant application, in the
amount of $50,000, for the City of Dover Housing Rehabilitation Program. She indicated that
this program provides repairs on owner-occupied homes for low-to-moderate income individuals
and assists in bringing these homes up to code. She stated that there is a high demand for this
program, noting that the waiting list has been closed since 2009; however, she still receives
several calls weekly from interested individuals. Mrs. Harvey noted that the project will focus
Page 99
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2011 PAGE 6
on preserving existing housing stock in the City, with the goal of rehabilitating four (4) to (5)
homes, using up to $15,000 per household to perform needed repairs. Mrs. Harvey advised
members that this program would be severely impacted if not funded during this grant cycle.
Homeownership Assistance Program
Mrs. Tracey Harvey, Community Development Manager, reviewed a grant application, in the amount
of $40,000, for the City of Dover Homeownership Assistance Program. She indicated that this
program provides first-time homebuyers assistance with down payment or closing costs, allowing
them to purchase affordable housing in the City of Dover. Mrs. Harvey advised members that there
is a high demand for this program and that CDBG funds would be used to provide up to $10,000
each to four (4) first-time homebuyers to assist in the purchase of properties in the City. She noted
that all purchasers must complete a homeownership counseling session with the National Council
on Agricultural Life and Labor Research, Inc. (NCALL) before signing a sales contract.
Review/Scoring of Community Development Block Grant (CDBG) Applications
Members reviewed and discussed the various CDBG grant applications to develop a score for each
applicant.
After a period of discussion, members conducted a review of each grant application and provided
individual scores on the CDBG Grant Application Scoring Sheet for applicants (as on file in the
Office of the City Clerk) and staff tallied the scoring sheets.
Mr. Ruane moved that the full amount of CDBG funds permitted for public service activities
($43,826) be dedicated for this purpose, seconded by Mrs. Horsey and unanimously carried.
Dr. McGlumphy moved to consider those applications addressing public service activities
(Dover Interfaith Mission for Housing, Connections Community Support Program, and the
Downtown Dover Partnership) separately from the non-public service applications, seconded
by Mr. Ruane and unanimously carried.
Mr. Lewis moved to recommend that $10,000 of the City’s CDBG grant allocation be distributed
to Community Connections Support Program and the remaining non-public service funds be awarded
to the Dover Interfaith Mission for Housing.
Mrs. Horsey moved to amend the motion by decreasing the amount of funds to be awarded to
Community Connections Support Program to $5,000, seconded by Mr. Lewis. The motion to
recommend that $5,000 of the City’s CDBG grant allocation be distributed to Community
Connections Support Program and the remaining non-public services funds ($37,826) be
awarded to the Dover Interfaith Mission unanimously carried.
Members then scored the CDBG applications for non-public service programs.
Page 100
SPECIAL PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING OF MARCH 24, 2011 PAGE 7
Based on the scoring of the grant applications by the Committee, Mr. Ruane moved to
recommend approval of the distribution of the City’s Community Development Block Grant
(CDBG) monies for non-public service programs as follows:
Amount Amount
Applicant Requested Recommended
RC&D $ 40,000 $ 40,000
City of Dover Streets Program $ 203,000 $ 65,580
City of Dover Community Development Projects:
Housing Rehabilitation Program $ 50,000 $ 40,000
Homeownership Assistance Program $ 40,000 $ 40,000
The motion was seconded by Mr. Lewis and carried with a vote of four (4) yes, and one (1) no
(Dr. McGlumphy).
Dr. McGlumphy stated that he disagreed with the CDBG allocation process and did not believe that
the City should be involved in the process in this manner.
Mr. Ruane moved to include a stipulation that all funds recommended for distribution to the
City of Dover Streets program be allocated to the rehabilitation of South New Street, seconded
by Mrs. Horsey and carried with a vote of four (4) yes and (1) abstention (Dr. McGlumphy).
Mrs. Horsey moved for adjournment, seconded by Mr. Lewis and unanimously carried.
Meeting Adjourned at 1:58 P.M.
Respectfully submitted,
Sophia R. Russell
Chairwoman
SR/JS/ac/dd/tm
S:\AGENDAS & MINUTES\Committee-Minutes\2011\03-24-2011 SPECIAL PR&CE.wpd
Attachment
Attachment #1 - Diamond State Community Land Trust Economic Summary, Dated March 24, 2011
Page 101
ATTACHMENT #1
Special PR&CE Committee Meeting of 03/24/2011
Page 102
UTILITY COMMITTEE
The Utility Committee Meeting was held on March 28, 2011 at 5:00 p.m. with Chairman Ruane
presiding. Members present were Mr. Bonar, Mr. McGiffin, Major Kosior and Mr. Snaman.
Members of Council present were Council President Hogan (arrived at 5:27 p.m., departed at 5:29 p.m., and
returned at 5:43 p.m.) Mr. Leary (arrived at 5:40 p.m.) . Mayor Carey (arrived at 5:34 p.m.) was also present.
AGENDA ADDITIONS/DELETIONS
By unanimous consent, the agenda was approved, as presented.
Evaluation of Proposals - Energy Management Agreement
Mr. Anthony DePrima, City Manager, reminded members that on May 4, 2006, the City of Dover
entered into an Energy Management Agreement with Pace Global Asset Management, LLC (PACE)
to assist the City with its energy procurement, energy sales, purchase of fuels, establishment and
management of risk policies, development and management of hedging protocols, provision of
power plant oversight and bidding strategy, and related energy procurement processes. He noted that
this agreement will expire on June 30, 2011.
Due to the extreme importance of this contract, Mr. DePrima stated that a staff team (including
himself, Donna Mitchell, Controller/Treasurer; Ronald Lunt, Public Utilities Director; and due to
the confidentially of the various proposals, Mr. Kirk Betts, Counsel from Betts and Holt LLP) was
organized to solicit proposals from potential bidders. He stated that the team issued a Request for
Qualifications to sixteen (16) firms and that seven (7) responses were received. After evaluating the
responses received, the team selected three (3) finalists and a Request for Proposal (RFP) was sent
to these parties. He noted that, as a part of the RFP request, the current Energy Management
Agreement was included in the package to be used as a basis for the new agreement. Mr. DePrima
advised members that on February 8th and 9th, interviews were conducted with the three (3) finalists.
Subsequent to these interviews, he stated that a “best and final” offer was requested and due by
February 28th so that the team could have ample time to develop a final recommendation. He stated
that of the three (3) proposals that were submitted, one (1) was rejected as non-compliant and not
considered for the final recommendation; however, the proposals submitted by PACE and The
Energy Authority, Inc. (TEA) were comprehensive and fully complied with the RFP. A summary
of the recommendation from the team was provided to members, which included details of the
analysis.
Staff recommended that the City Manager be authorized to execute a five (5) year contract with an
annual fee of $996,000, plus additional services as required, with The Energy Authority, Inc. (TEA)
as per the terms of the RFP.
Mr. DePrima stated that TEA was less costly than PACE Global and will also bring a certain depth
of services, as well as an association with other power companies that the City currently does not
have.
In response to Mr. Snaman, Mr. Ron Lunt, Public Utilities Director, stated the importance of
understanding the structure of TEA. He explained that TEA is a creation of public power utilities,
rather than a vendor who provides services to members of the authority. Mr. Lunt indicated that
Page 103
UTILITY COMMITTEE MEETING OF MARCH 28, 2011 PAGE 2
TEA members provide services to themselves; therefore, it is difficult to obtain references. He stated
that TEA’s largest utility customer is Orlando Utilities and that the presentation by TEA includes
an outline of its owners.
Mr. McGiffin questioned if the City would become an owner if the City entered into a contract with
TEA. Responding, Mr. Lunt stated that, at this point, the City would be taking services from the
authority as a customer. TEA currently provides services to 38 customers who are not members.
He stated that he has spoken with another customer of TEA, Franklin Public Utility District, who
indicated their satisfaction.
Noting that TEA has offices located in Florida and on the West Coast, Mr. Snaman questioned if
TEA has any offices in the Northeast and how long TEA has been in business. Responding,
Mr. DePrima stated that TEA became incorporated in 1997; however, he noted that all companies
in this business are new since these companies were created to address the deregulation of the
wholesale power market. In regards to TEA’s office locations, Mr. DePrima noted that there are
provisions in the contract that require TEA to be in Dover on a monthly basis to meet with City staff.
Responding to Mr. McGiffin, Mr. DePrima stated that TEA is a Limited Liability Corporation (LLC)
that has 14 members who are equitable owners (partners and members of the Board of Directors).
He noted that there are 38 additional power companies who are customers of TEA and, as he
understands, there is an option for a customer to become an equitable owner of the corporation,
explaining that it is not a closed LLC.
Mr. Ruane referred to Exhibit #1 - Recommendation of Energy Manager and requested an
explanation of the cost reduction provided by PACE that imposes several new conditions, one of
which is a generation cumulative run-time limit of 100 unit run-hours/year (the sum total of all
run-hours of all units, including for PJM testing - over 100 hours triggers an hourly fee).
Mr. DePrima stated that in order to reduce their flat fee, PACE put a restriction on the run-time of
the plant, explaining that once the plant runs over the 100 hours, there would be an additional fee
for their services for running the plant. He confirmed that this was a factor in the development of
the recommendation.
Responding to Mr. Bonar, Mr. Lunt stated that, last year, there were several days that the plant ran
over 100 hours, noting that this past summer, there were 24 days that the plants ran over 100 hours.
Mr. DePrima stated that if there was a year that the plants were not run at all, there would be
approximately 100 hours of run-time for the required testing.
At the request of Mr. Ruane, Mr. DePrima explained that PACE provided two (2) proposals: one
based on a base fee and another based on PACE sharing the revenue acquired from the
Auction Revenue Rights (ARR), which is a transmission strategy to mitigate the cost of congestion.
He confirmed that the recommendation was based on the base fee proposal rather than the ARR
option, since specific amounts would be difficult to determine.
Page 104
UTILITY COMMITTEE MEETING OF MARCH 28, 2011 PAGE 3
In response to Mr. Ruane, Mr. DePrima stated that TEA has more experience with trading in various
energy markets and would bring a 24/7 experience to the City of Dover. Elaborating, Mr. Lunt
explained that the value of a trading floor is that they are always working in the markets and are able
to follow trends and flows of power marketing. TEA’s floor consists of several traders, working on
a 24-hour basis, who monitor power costs to discover opportunities to sell or buy power on a
short-term basis. He stated that having their own trading floor allows TEA to better estimate, follow,
monitor, and track where the power supply is and where the costs and possible revenues are as well.
It was his belief that TEA’s ability to continuously schedule and bid in the market may provide the
City an opportunity that would not be available otherwise.
Mr. Ruane noted that a representative of PACE has been involved with the 2030 Committee and
questioned the effect that a change in contract would have in this regard. Responding, Mr. DePrima
assured members that, like PACE, TEA has committed to providing basic services to the 2030
Committee and, if there are more detailed negotiations or contracts over and above the basic
services, they would be paid (as PACE is). Therefore, it was his feeling that, other than specific
individuals being different and there being a learning curve required, there would be no changes.
He advised members that the City will retain the services of PACE for the negotiations related to the
LS Power Project in West Deptford, New Jersey.
In response to concerns of Mr. Ruane, Mr. DePrima stated that the North American Energy Services
Corporation (NAES) is an independent company from PACE and that the contract with NAES is
effective for an additional year. He confirmed that NAES will remain responsible for the plant
operations at this time.
As mentioned by staff, Mr. Ruane reiterated that PACE provided the City of Dover with excellent
service during the past several years.
Responding to Mr. Snaman, Mr. DePrima stated that TEA would be submitting a monthly report.
Mr. DePrima introduced Mr. Jamie Mahne, Member Services Manager for TEA, who will be
working with the City, serving as a project manager for coordinating services.
Mr. Mahne reviewed a Presentation - Overview of The Energy Authority (Attachment #1). He
relayed the importance of a true partnership and that TEA does a good job at not only maintaining
customer satisfaction but also tracking customer satisfaction, which is part of TEA’s annual process.
He advised members that every employee of TEA is compensated based on the results of customer
satisfaction surveys. He indicated that TEA’s goal is to produce “extremely satisfied” results from
customers. He stated the importance of value focused delivery, and requested that if the City values
a service that TEA is not providing, that TEA be informed in order to make necessary changes.
Responding to Mr. McGiffin regarding the non-profit status of TEA, Mr. Mahne explained that there
are two (2) IRS private letter rulings indicating that TEA is a 501(c)(3) organization and, as such,
is tax-exempt and not permitted to provide services to “for profit” companies. (City Clerk’s Office
Note: At the request of Mr. McGiffin, members were provided an explanation of TEA’s non-profit
status in an email dated March 30, 2011 (Attachment #2).
Page 105
UTILITY COMMITTEE MEETING OF MARCH 28, 2011 PAGE 4
Mr. Bonar moved to recommend that the City Manager be authorized to execute a five (5) year
contract with an annual fee of $996,000, plus additional services as required, with The Energy
Authority, Inc. (TEA), as per the terms of the Request for Proposal (RFP). The motion was
seconded by Mr. McGiffin and unanimously carried.
By unanimous consent, the meeting adjourned at 5:54 p.m.
Respectfully submitted,
Eugene B. Ruane
Chairman
EBR/DD/jg/js/ac/tm
S:\AGENDAS & MINUTES\Committee-Minutes\2011\03-28-2011 UTILITY.wpd
Attachment to Original Minutes and File Copy
Attachment #1 - Presentation - Overview of The Energy Authority
Attachment #2 - Emailed dated March 30, 2011 - Explanation of TEA’s Non-Profit Status
Page 106
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held on March 28, 2011 at
6:00 p.m. with Chairman Leary presiding. Members present were Mr. McGiffin, Mr. Salters,
Dr. Jones, and Mr. Shevock. Members of Council present were Council President Hogan,
Mr. Bonar, and Mr. Ruane. Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Shevock moved for approval of the agenda, seconded by Mr. Salters and unanimously
carried.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of a Hiring Freeze for
Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review and approval
of the Legislative, Finance, and Administration Committee and City Council. It was suggested that
there be a “standing” agenda item to consider the filling of critical positions and, if there were no
positions to consider, the item could be removed.
Administrative Assistant - Police Department
Police Chief James Hosfelt reviewed a request to recruit for an Administrative Assistant to the
Chief of Police. He advised members that a vacancy will be created with the retirement of the
Department’s current Administrative Assistant in December 2011. Due to the lengthy process
involved in filling a position within the Police Department, which requires a background
investigation, he requested permission to begin recruitment at this time.
Mr. McGiffin moved to recommend approval of the request to recruit for the Administrative
Assistant to the Chief of Police, as recommended by staff. The motion was seconded by
Dr. Jones and unanimously carried.
FY 2012 Five-Year Capital Investment Plan (CIP) (Deferred on March 14, 2011 Due to Time
Constraints)
During their meeting on March 14, 2011, members deferred review of the FY 2012 Five-Year
Capital Investment Plan (CIP) due to time constraints.
Mr. Anthony DePrima, City Manager, reviewed the FY 2012 Five-Year CIP and noted that all new
projects have been highlighted.
In response to Dr. Jones, Mr. DePrima stated that he would with consult Mr. Scott Koenig, Public
Services Manager/Director of Public Works, to determine if the Salt Storage Facility at Schutte Park
should be deferred until after the trial of the Brine Manufacturing System.
Responding to Dr. Jones, Mr. DePrima stated that there are no plans to provide air conditioning for
the Pitts Center at Schutte Park.
In response to Mr. Ruane, Mr. DePrima indicated that the Customer Notification System by E-IVR
Automated Dialing is similar to the Reverse 911 System, serving as a more cost-effective way of
notifying customers of disconnection, outages, etc. He stated that the Reverse 911 System was
Page 107
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MARCH 28, 2011 PAGE 2
included in the proposed budget and has not been included in the CIP because there are no
equipment costs.
With regard to disconnection calls, Mr. Bonar suggested that staff obtain customers’ permission to
leave such messages if there is no answer, since this could cause consumer credit issues and legal
ramifications.
By unanimous consent, members recommended acceptance of the FY 2012 Five-Year Capital
Investment Plan (CIP) as presented.
Review of Hospitality and Civic Function Policy (Committee Deferred on March 14, 2011
Pending Additional Information)
During their meeting of February 28, 2011, members considered a request from
Mayor Carleton E . Carey, Sr. to include certain functions offered by the Central Delaware Chamber
of Commerce and Kent County Tourism in the City’s Hospitality and Civic Function Policy.
Mayor Carey noted that these events are not covered under the City’s existing Policy. At that time,
members deferred action and requested that Mayor Carey provide the cost for each of the events
listed and the annual cost for members to attend these events.
During their meeting of March 14, 2011, members were provided details regarding the costs
associated for members of Council to attend these functions and deferred action to allow staff the
opportunity to make revisions to the Hospitality and Civic Function Policy.
Mrs. Donna Mitchell, Controller/Treasurer, reviewed the proposed revisions to the Hospitality and
Civic Function Policy, noting that additions to the policy were noted in red font and deletions were
noted with strikeouts.
Mr. Salters moved to recommend approval of the revisions to the Hospitality and
Civic Function Policy (Attachment #1), seconded by Mr. Shevock and unanimously carried.
Reallocation of State Bond Funds (Request of Councilman Bonar)
Mr. Bonar stated he did not feel that the City of Dover has been receiving its “fair share” of State
funding and that he made a commitment to take any action necessary to ensure this would be
accomplished. He reminded members that, several years ago, there was discussion
regarding building a civic center in the area at an estimated cost of $13M, including the purchase of
land. He stated that the Legislative Bond Bill Committee (under former Senator Nancy Cook and
the late Senator James Vaughn) allocated funds specifically for this project. To date, he noted that
there is $6M in the fund.
Mr. Bonar stated that, due to budgetary constraints, the City never took action on this project, other
than being involved in related discussions and studies. Since the City has not moved forward with
this project, and due to the current economic situation in the State, Mr. Bonar advised members that
the Governor wants to de-authorize the $6M in the fund and reallocate the funds to other projects.
Page 108
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MARCH 28, 2011 PAGE 3
Mr. Bonar stated that one (1) of the projects being considered is a soccer complex near Frederica that
would peripherally benefit the City of Dover; however, it was his feeling that since the funds were
allocated specifically for and within the City, they should remain dedicated to City projects.
Understanding that the State will need some of the funds from the account, Mr. Bonar suggested that
the City establish a group to meet with legislators to request that a significant portion of the $6M be
set aside specifically for economic development projects in the City that would benefit the residents
of the State of Delaware. As an example, he stated that the City is in early discussions regarding the
possibility of a combined-cycle natural gas generator to be built on the Garrison Tract in the City of
Dover. Mr. Bonar suggested that the City propose that the State allocate $4M of the $6M for the
purpose of building roads, water, wastewater, and other infrastructure that will be necessary at the
Garrison Tract. He stated that this project would employ hundreds of workers during construction
and other employees once the facility is complete. He felt that this project would benefit all residents
of the City, as well as the State of Delaware, by reducing electric bills.
Mr. Bonar reminded members that the purpose of the $6M originally allocated to the City was to
encourage economic development and that the creation of jobs and a reduction in electric fees would
provide such economic development and a benefit to all residents. He noted that, in accordance with
the State Controller General’s Office, construction of these types of infrastructure improvements is
a permitted use for the allocated funds.
Mr. Bonar reiterated his request for the Committee to recommend that Council establish a committee
to encourage the legislators, the Bond Bill Committee, and the Governor to ensure that this allocation
is accomplished in this legislative year, ending July 1, 2011.
Responding to Mr. Ruane, Mr. Bonar confirmed that, in addition to the proposed soccer complex,
a portion of these funds is proposed for the civil air terminal. He stated that the request for funds
exceeds $4M for both projects, and it is his understanding that the additional $1.5M to $2M would
be reallocated by the Bond Bill Committee.
In response to Mr. Shevock, Mr. Bonar stated that the Bond Bill Committee has not made a final
decision regarding the reallocation of the funds.
Mayor Carey referred to a letter received from the Chamber of Commerce (Attachment #2)
requesting the City to support their efforts in the re-allocation of these funds for the Kent County
Sports Complex. He suggested that members respond to the Chamber of Commerce regarding the
City’s position in this regard.
In addition to the infrastructure mentioned by Mr. Bonar, Mr. Anthony DePrima, City Manager,
indicated that there are 14 additional 10-acre lots available at the Garrison Tract for development;
therefore, an investment in the infrastructure would make 140 acres “shovel ready” for other types
of economic development at that location.
Page 109
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MARCH 28, 2011 PAGE 4
Mr. Salters moved to recommend that City Council authorize the formation of a committee
to meet with and encourage State Legislators, the Bond Bill Committee, and the Governor to
ensure that a significant portion of the $6M, currently authorized for the construction of a
civic center, be specifically allocated for an economic development project within the City of
Dover that will benefit every resident of the State of Delaware, such as the construction of a
combined-cycle natural gas generator at, or infrastructure that will be necessary to, the
Garrison Tract, and that this allocation be accomplished in this legislative year, ending
July 1, 2011, and that a letter be sent in response to related correspondence received from the
Central Delaware Chamber of Commerce, dated March 2, 2011. The motion was seconded
by Mr. McGiffin and unanimously carried. (Clerk’s Office Note: As a result of the Committee’s
recommendation, City Council will consider the approval of a letter to the Central Delaware
Chamber of Commerce on April 11, 2011 (Attachment #3).
By unanimous consent, the meeting adjourned at 6:30 P.M.
Respectfully submitted,
Thomas J. Leary
Chairman
TJL/DD/jg/js/ac/tm
S:\AGENDAS & MINUTES\Committee-Minutes\2011\03-28-2011 LF&A.wpd
Attachments
Attachment #1 - Revised Hospitality and Civic Function Policy
Attachment #2 - Letter Dated March 2, 2011 from the Central Delaware Chamber of Commerce
Attachment #3 - Draft Letter to the Central Delaware Chamber of Commerce
Page 110
ATTACHMENT #1
LF&A Committee Meeting of 03/28/2011
CITY OF DOVER
HOSPITALITY & CIVIC FUNCTION POLICY
A. PURPOSE
There are occasions when the judicious extension of hospitality in connection with official City of
Dover business is in the best interests of the City of Dover, hereinafter referred to as “City.” There
are also occasions where attendance at civic events and functions which are not sponsored by the
City are in the best interests of the City, and thus may require attendance. This policy outlines City
policy and procedures governing the manner and extent to which the City’s employees, public
officials, and appointees may extend hospitality while attending civic functions and events.
II. SCOPE
This policy applies to all hospitality and civic function expenses incurred by the City regardless of
the source of funding, and to all City employees, public officials and appointees to City Boards,
Commissions and Committees.
III. ALLOWABLE EXPENSES AND APPROVAL
A. Allowable Expenses and Occasions
Expenses for hospitality and civic functions must be directly related to, or associated with the
conduct of official City business. If the occasion is not sponsored by an organization of which the
City sponsors or is a member of, then the occasion must serve a clear City interest business purpose,
with negligible personal benefit derived by the official host or other City employees, public officials,
and appointees. In addition, the expenditure of funds for hospitality and civic functions should be
cost effective and in accordance with the best use of public funds.
Examples of Prohibited/Restricted Expenses:
Personal Memberships
Political Expenses
Holiday Gatherings for non-City affiliated organizations
Fundraising Non-budgeted Cash Donations
B. Approval of Transactions
When determining whether a hospitality or civic event expense is appropriate, the approving
authority must evaluate the importance of the event in terms of the costs that will be incurred, the
benefits to be derived from such an expense, the availability of funds, and any alternatives that
would be equally effective in accomplishing the desired objectives.
C. Payment of Expenses
The Finance Department shall process the payment of hospitality and civic functions expenses upon
receipt of the invitation, invoice, or proper support documentation, as determined by Finance, with
the signature of the Mayor, a Member of Council, and/or City Manager.
Approved by Council: March 24, 2005 (To be revised when approved)
Page 111
ATTACHMENT #2
LF&A Committee Meeting of 03/28/2011
Page 112
ATTACHMENT #3
LF&A Committee Meeting of 03/28/2011
City of Dover
MAYOR AND COUNCIL
April 12, 2011
Ms. Lisa Hastings, Board Chair, CDCC
435 North DuPont Highway
Dover, DE 19901
Ms. Hastings:
Thank you for expressing your concern regarding the Governor’s proposal to de-authorize State
Bond Funds authorized for a civic center in the City of Dover.
During their regular meeting of April 11, 2011, City Council approved the recommendation of the
Legislative, Finance, and Administration Committee and authorized the formation of a committee
to meet with and encourage State Legislators, the Bond Bill Committee, and the Governor to ensure
that a significant portion of the $6M, currently authorized for the construction of a civic center, be
specifically allocated for an economic development project within the City of Dover that will benefit
every resident of the State of Delaware, such as the construction of a combined-cycle natural gas
generator at, or infrastructure that will be necessary to, the Garrison Tract, and that this allocation
be accomplished in this legislative year, ending July 1, 2011.
On behalf of the members of City Council, we appreciate your continued efforts in support of
economic development initiatives for the City of Dover and Kent County.
Sincerely,
Kenneth L. Hogan Carleton E. Carey, Sr.
Council President Mayor
KLH/CEC/dld
S:\Correspondence\Council Meeting\2011\CDCC - Reallocation of State Bond Funds 03-28-2011 LF&A.wpd
P.O. Box 475 Dover, Delaware 19903
Community Excellence Through Quality Service
Page 113
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee Meeting was held on March 30, 2011 at
5:02 p.m. with Chairwoman Williams presiding. Members present were Mr. Bonar,
Mrs. Russell (arrived at 5:14 p.m.) , Mr. Davis, and Mr. Harmon.
AGENDA ADDITIONS/DELETIONS
Mr. Bonar moved for approval of the agenda, seconded by Mr. Davis and unanimously
carried.
FY 2012 Five-Year Capital Investment Plan (CIP)
Mr. Anthony DePrima, City Manager, reviewed the FY 2012 Five-Year Capital Investment
Plan (CIP) and noted that all new projects have been highlighted.
Noting that the City’s Annual Contribution in the CIP has decreased, Fire Chief Jack Fortney advised
members that, prior to his taking office, an error was made on the reporting regarding the purchase
of Ladder 2. He explained that the information originally indicated that the loan would be paid in
2012; however, he stated that it will not be paid until September 2014. Chief Fortney also advised
members that Engine 7 was due to be replaced in 2013 at a cost of $584,997 (amortized over seven
(7) years with yearly payments of $83,571). He stated that he and other fire line reviewed the need
to replace Engine 7 and determined that, due to the economic situation, replacement of this engine
could be deferred since it is utilized as a spare. He explained that in 2015 Engine 3 will be due for
replacement, and it is planned to replace Engine 7 at that time and utilize Engine 3 as a spare.
Chief Fortney explained his request to outfit the heavy Rescue 1 truck at Station 1 with Holmatro
equipment. He stated that several years ago, the Fire Chief outfitted all engines with Holmatro
equipment; however, Rescue 1 was not outfitted and has Hurst equipment, which he advised
members is not interchangeable. Chief Fortney stated that it was necessary to have repair work
performed on the Hurst equipment recently and that the cost was over $2,100 and did not include
the power unit. At the time of the repairs, it was noted that new blades would be necessary. As a
result, the Chief stated that it would be necessary to make purchases either from Hurst or Holmatro.
In order for the equipment to be interchangeable and provide consistency, he requested funding, in
the amount of $56,234, to outfit Rescue 1 with Holmatro Equipment.
For informational purposes, Chief Fortney provided a Holmatro/Hurst Comparison Chart
(Attachment #1). It was his opinion that Holmatro has surpassed Hurst in terms of technology.
Although not provided in the CIP report, Mr. DePrima stated that staff has included the standard
Street Improvement Program, budgeted $300,000 in the General Fund, and will seek Community
Transportation Funds. He stated that $50,000 has been included for the Sidewalk Replacement
Program.
Responding to Mr. Harmon, Mr. DePrima stated that when a fire truck is purchased, a bank note is
issued to the Fire Department and the sale of the old fire truck is generally used to finance the
equipment that will go on the new truck.
Mr. Bonar moved to recommend acceptance of the FY 2012 Five-Year Capital Investment
Plan (CIP) as presented, seconded by Mr. Harmon and unanimously carried.
Page 114
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MARCH 30, 2011 PAGE 2
Announcement of Public Workshop - Alternatives for the Clarence Street Extended Project
Mr. Anthony DePrima, City Manager, announced that the City of Dover, in conjunction with the
Federal Highway Administration, will hold a workshop to present recommended alternatives for the
Clarence Street Extended Project. He stated that these improvements are part of the City’s overall
“Strategic Development Plan for the West Side” to further enhance the downtown area.
Mr. DePrima stated that the Workshop will be held on Tuesday, April 12, 2011, from 4:00 p.m. to
7:00 p.m. at Union Missionary Baptist Church, 883 Lincoln Street, Dover.
Mr. Bonar moved for adjournment, seconded by Mr. Davis and unanimously carried.
Meeting Adjourned at 5:25 P.M.
Respectfully submitted,
Beverly C. Williams
Chairwoman
BCW/AC/jg/js/dd/tm
S:\AGENDAS & MINUTES\Committee-Minutes\2011\03-30-2011 SA&T.wpd
Attachment
Attachment #1 - Holmatro/Hurst Comparison Chart
Page 115
ATTACHMENT #1
SA&T Committee Meeting of 03/30/2011
HOLMATRO/HURST COMPARISON CHART
HOLMATRO HURST
Spreading/ Cutting NFPA Tool Operating Spreading/ Cutting NFPA Tool Operating
Force Comp. Weight Pressure Force Comp. Weight Pressure
10,500 psi 5,000 psi
Spreaders 33,625 Yes 42 Spreaders 31,000 Yes 62
Cutters 208,000 Yes 35 Cutters 72,000 Yes 40
Combi Tool 16,600 / 67,600 Yes 35 Combi Tool 13,000 / 60,000 Yes 42
Small Ram 49,145 Yes 27 Small Ram 14,830 Yes 40
Medium Ram 49,145 Yes 40 Medium Ram 14,830 Yes 47
Fluid: Fluid:
Mineral Oil, a non toxic, not caustic material Hydralic Fluid, causes skin irritation and elevated temps may cause
release of toxic vapors which are harmful if inhaled
Page 116
CITY OF DOVER
FINANCE DEPARTMENT
MONTHLY BUDGET REPORT
FEBRUARY 2011
PREPARED BY: FINANCE DEPARTMENT
PLEASE NOTE – THIS REPORT PROVIDES TOP LINE INFORMATION ON THE THREE MAJOR
OPERATING FUNDS. IF YOU WOULD LIKE ADDITIONAL INFORMATION, PLEASE FEEL
FREE TO CONTACT THE FINANCE DEPARTMENT.
Page 117
Page 2 of 10
City of Dover
Finance Department
Monthly Budget Report
February 2011
S
Strategic Objectives for Fiscal Year 2010 – 2011
1. Develop Days Sales Outstanding (DSO) monthly report to provide timely information on
receivable collections.
2. Assist with implementation of inventory system for Electric Plant inventory.
3. Implementation and transition to an external service for time keeping and payroll.
4. Implement and transition to lockbox and remote deposit services for cash receipts.
ACTIVITY LEVELS
FY10 YTD FY11 YTD
BANK TRENDS
Number of Deposits Made 752 2,275
Total Amount of All Deposits $ 90,965,032 $ 101,523,502
PAYROLL
Hours % Amount Hours % Amount
Gross wages per registers 667,412 100.0% $ 14,548,024 629,550 100.0% $ 14,171,556
Wages and Hours Worked
Regular 538,286 80.7% $ 11,348,826 525,254 83.4% $ 11,262,318
All over time 27,895 4.2% $ 1,071,027 24,103 3.8% $ 997,509
Other Paid or Unpaid Wages and Hours
Vacation 39,466 5.9% $ 1,019,082 38,732 6.2% $ 984,135
Sick 13,182 2.0% $ 297,058 13,844 2.2% $ 318,416
Furlough 15,780 2.4% $ - 1,506 0.2% $ -
Terminal Leave - Retiree Vacation/Sick Payout 15,001 2.2% $ 447,669 3,220 0.5% $ 91,298
Comp Time (Police) 3,947 0.6% $ 120,772 4,900 0.8% $ 155,372
Personal 1,165 0.2% $ 31,242 1,126 0.2% $ 31,864
Leave Without Pay 3,536 0.5% $ - 2,434 0.4% $ -
Other (description below) 9,155 1.4% $ 212,347 14,433 2.3% $ 330,644
Other includes: pay adjustments, military differential pay, committee meetings, worker compensation tracking/adjustments, etc.
Other Activity
Number of Pay Periods 18 18
Number of Payroll Checks & Direct Deposits Issued 7,800 7,396
Number of Pension Checks Issued 1,835 1,808
Total Pension Benefits Paid - Defined Benefit Plan $ 2,894,563 $ 3,025,321
Payroll Checks & Direct Deposits issued: number of payroll checks issued for FY 2010 includes separate checks for shoe allowance & clothing allowance.
ACCOUNTS PAYABLE
Number of Check Vouchers 4,802 4,350
Number of EFT Vouchers 1,164 1,423
Vouchers Dollar Amount Disbursed $ 76,757,138 $ 96,735,941
Page 118
Page 3 of 10
City of Dover
Finance Department
Monthly Report – February 2011
General Fund Summary
Revised 67% of
Budget Budget YTD Balance Budget
Beginning Balance $ 2,277,575 $ 2,654,528 $ 2,655,562 $ (1,034) 100.0%
Revenues
Court of Chancery Fees 645,000 645,000 359,200 285,800 55.7%
Fines & Police Revenues 881,502 881,502 656,543 224,959 74.5%
Franchise Fees 486,000 486,000 273,869 212,131 56.4%
Grants 831,850 831,850 425,072 406,778 51.1%
Intrafund Services 4,347,834 4,347,834 2,683,192 1,664,642 61.7%
Library & Recreation Revenues 665,689 665,689 408,905 256,784 61.4%
Licenses & Permits 2,457,675 2,457,675 2,081,867 375,808 84.7%
Property Taxes (Includes BID Revenue) (1) 11,035,326 11,035,326 10,868,048 167,278 98.5%
Sanitation Revenues 2,387,511 2,387,511 1,508,201 879,310 63.2%
Other Miscellaneous Revenues 365,250 365,250 135,506 229,744 37.1%
Transfers-In from Special Funds & Utilities
Civil Traffic Penalties 930,000 930,000 557,318 372,682 59.9%
Municipal Street Aid Fund 526,843 526,843 395,500 131,343 75.1%
Transfer Taxes 1,000,000 650,000 1,142,833 (492,833) 175.8%
Electric Fund 8,856,000 8,856,000 7,828,000 1,028,000 88.4%
Total Revenues 35,416,480 35,066,480 29,324,054 5,742,426 83.6%
Total Beginning Balance & Revenues $ 37,694,055 $ 37,721,008 $ 31,979,616 $ 5,741,392 84.8%
Expenditures
City Clerk & Council $ 418,172 $ 418,172 $ 240,222 $ 177,950 57.4%
Mayor, City Manager & Human Resources 1,008,803 1,008,803 679,787 329,016 67.4%
Police & Police Extra Duty 12,907,889 12,907,889 8,220,781 4,687,108 63.7%
Public Services 4,574,682 4,574,682 2,823,024 1,751,658 61.7%
Central Services 2,422,663 2,422,663 1,489,823 932,840 61.5%
Planning & Inspections 1,943,804 1,943,804 1,306,070 637,734 67.2%
Finance, Info Tech & Customer Services 2,444,787 2,444,787 1,528,226 916,561 62.5%
Library & Recreation 1,904,696 1,904,696 1,161,757 742,939 61.0%
Fire Department 709,862 709,862 451,148 258,714 63.6%
Assessor 197,249 197,249 118,963 78,286 60.3%
Insurance 600,000 600,000 407,270 192,730 67.9%
OPEB - Retiree’s Health Care Contribution 1,297,509 1,297,509 973,129 324,380 75.0%
Police Pension Trust Contribution - State Grant 620,000 620,000 127,000 493,000 20.5%
Appropriation to Pension Fund 1,090,000 1,090,000 841,250 248,750 77.2%
Street Lights 985,000 985,000 631,766 353,234 64.1%
Debt Service 331,800 331,800 330,850 950 99.7%
Transfer to CDBG 6,000 6,000 - 6,000 0.0%
Provision for Uncollectible 10,000 10,000 10,000 - 100.0%
Transfers Out
Capital Projects Fund 1,307,839 1,307,839 1,307,839 - 100.0%
Total Expenditures 34,780,755 34,780,755 22,648,905 12,131,850 65.1%
Budget Balance - Working Capital 2,913,300 2,940,253 - 2,940,253 0.0%
Total Budget Balance & Expenditures $ 37,694,055 $ 37,721,008 $ 22,648,905 $ 15,072,103 60.0%
Reserve Balances
Contingency $ 417,971 $ 553,493 $ 538,084
(1) Property Taxes are the taxes billed and not cash received. The outstanding receivable balance as of 2/28/11 is $544,044 as
compared to $394,252 in February 2010.
Page 119
Page 4 of 10
City of Dover
Finance Department
Monthly Report – February 2011
Water/Wastewater Fund Summary
Revised 67% of
Budget Budget YTD Balance Budget
Beginning Balance - Water $ 943,545 $ 1,236,193 $ 1,236,546 $ (353) 100.0%
Beginning Balance - Wastewater $ 585,053 $ 902,719 $ 902,366 $ 353 100.0%
Beginning Balance - Kent County Treatment $ (1,632,876) $ (1,872,081) $ (1,872,081) $ - 100.0%
Revenues
Water Fees 4,206,700 4,206,700 3,461,079 745,621 82.3%
Wastewater Fees 3,308,300 3,308,300 2,516,789 791,511 76.1%
Kent County Treatment Fees 4,275,600 2,925,600 2,091,526 834,074 71.5%
Ground Water Adjusment Fees - 1,350,000 798,914 551,086 59.2%
Water Tank Leases 299,400 299,400 188,337 111,063 62.9%
Miscellaneous 72,515 72,515 64,403 8,112 88.8%
Impact Fees - Water 357,000 357,000 160,533 196,467 45.0%
Impact Fees - Wastewater 323,000 323,000 143,767 179,233 44.5%
Total Revenues 12,842,515 12,842,515 9,425,348 3,417,167 73.4%
Total Beginning Balance & Revenues $ 12,738,237 $ 13,109,346 $ 9,692,179 $ 3,417,167 73.9%
Expenses
Water/Wastewater Operating Divisions
Engineering & Inspection $ 642,878 $ 642,878 $ 312,631 $ 330,247 48.6%
Water 412,588 412,588 237,702 174,886 57.6%
Water Treatment Plant 1,499,857 1,499,857 965,378 534,479 64.4%
Wastewater 969,762 969,762 582,159 387,603 60.0%
Construction & Inspection 392,561 392,561 260,087 132,474 66.3%
Kent County Treatment Fees 4,235,403 4,235,403 2,320,545 1,914,858 54.8%
Intrafund Services 1,272,331 1,272,331 709,866 562,465 55.8%
OPEB - Retiree’s Health Care Contribution 177,427 177,427 133,068 44,359 75.0%
Pension Trust Contribution - Unfunded liability 372,000 372,000 279,000 93,000 75.0%
Debt Service 562,601 562,601 269,276 293,325 47.9%
Transfers Out
Water I & E Fund 500,000 500,000 500,000 - 100.0%
Wastewater I & E Fund 500,000 500,000 500,000 - 100.0%
Capital Asset Reserve - Water 100,000 100,000 100,000 - 100.0%
Capital Asset Reserve - Wastewater 100,000 100,000 100,000 - 100.0%
Impact Fee Reserve - Water 110,597 110,597 - 110,597 0.0%
Impact Fee Reserve - Wastewater 6,802 6,802 - 6,802 0.0%
Total Expenses 11,854,807 11,854,807 7,269,712 4,585,095 61.3%
Budget Balances
Budget Balance - Working Capital - Water 1,348,501 1,641,149 - 1,641,149 0.0%
Budget Balance - Working Capital - Wastewater 1,127,608 1,445,274 - 1,445,274 0.0%
Budget Balance-Working Capital - Kent County Treatment (1,592,679) (1,831,884) - (1,831,884) 0.0%
Total Budget Balances 883,430 1,254,539 - 1,254,539 0.0%
Total Budget Balances & Expenses $ 12,738,237 $ 13,109,346 $ 7,269,712 $ 5,839,634 55.5%
Reserve Balances
Contingency-Water $ 126,607 $ 125,991 $ 124,031
Contingency-Wastewater $ 141,575 $ 140,887 $ 138,793
Impact Fee Reserve - Sewer NO BUDGET NO BUDGET $ 3,889,576
Impact Fee Reserve - Water NO BUDGET NO BUDGET $ 246,737
Bond Coverage Ratio (Covenant 1.20) 4.76 4.79 9.73
Page 120
Page 5 of 10
City of Dover
Finance Department
Monthly Report – February 2011
Electric Revenue Fund Summary
Revised 67% of
Budget Budget YTD Balance Budget
Beginning Balance $ 12,086,275 $ 13,537,864 $ 13,537,864 $ - 100.0%
Revenues
Sales to Customers 96,595,300 96,595,300 69,710,936 26,884,364 72.2%
Purchased Power Adjustment - Credit (2,000,000) (2,000,000) (1,413,891) (586,109) 70.7%
Utility Tax 1,864,800 1,864,800 1,341,865 522,935 72.0%
Weyandt Hall Rents 186,816 186,816 121,393 65,423 65.0%
Miscellaneous Revenues 1,085,500 1,085,500 783,946 301,554 72.2%
Intrafund Service Receipts Water/Wastewater 299,442 299,442 111,400 188,042 37.2%
Total Revenues 98,031,858 98,031,858 70,655,649 27,376,209 72.1%
Total Beginning Balance & Revenues $ 110,118,133 $ 111,569,722 $ 84,193,513 $ 27,376,209 75.5%
Expenses
Power Supply & Generation
Power Supply $ 48,059,699 $ 48,059,699 $ 32,832,884 $ 15,226,815 68.3%
Power Supply Management/Incentive 2,280,000 2,280,000 1,565,137 714,863 68.6%
Capacity Charges 11,618,223 11,618,223 8,450,736 3,167,487 72.7%
PJM Charges - Load 11,850,876 11,850,876 10,484,846 1,366,030 88.5%
Total Power Supply 73,808,798 73,808,798 53,333,603 20,475,195 72.3%
Plant Operations 5,694,315 5,694,315 3,875,717 1,818,598 68.1%
Generation Fuels 297,820 297,820 3,354,881 (3,057,061) 1126.5%
Capacity Credits (11,488,785) (11,488,785) (7,858,523) (3,630,262) 68.4%
PJM Credits (720,797) (720,797) (5,629,528) 4,908,731 781.0%
Total Generation (6,217,447) (6,217,447) (6,257,453) 40,006 100.6%
Total Power Supply & Plant 67,591,351 67,591,351 47,076,150 20,515,201 69.6%
Electric Operating Divisions:
Transmission/Distribution 3,206,515 3,206,515 1,975,274 1,231,241 61.6%
Electrical Engineering 1,842,903 1,842,903 798,989 1,043,914 43.4%
Administration 609,169 609,169 725,675 (116,506) 119.1%
Meter Reading 222,908 222,908 130,281 92,627 58.4%
Systems Operations 518,053 518,053 317,283 200,770 61.2%
Intrafund Services 3,374,945 3,374,945 2,084,726 1,290,219 61.8%
Utility Tax 1,864,800 1,864,800 1,341,865 522,935 72.0%
Interest on Deposits 54,500 54,500 17,677 36,823 32.4%
OPEB - Retirees Health Care Contribution 639,110 639,110 479,337 159,773 75.0%
OPEB Trust Contribution 1,200,000 1,200,000 1,200,000 - 100.0%
Pension Trust Contribution - Unfunded liability 833,000 833,000 624,750 208,250 75.0%
Green Energy Payment to DEMEC 128,600 128,600 95,797 32,803 74.5%
Accounts Receivable Write-Offs 135,000 135,000 135,000 - 100.0%
Inventory Write-Offs 175,000 175,000 175,000 - 100.0%
Pike Engineering - - 95,361 (95,361) 0.0%
Debt Service 4,058,700 4,058,700 1,801,097 2,257,603 44.4%
Transfers Out:
General Fund 8,856,000 8,856,000 7,828,000 1,028,000 88.4%
Electric Improvement & Extension Fund 3,500,000 3,500,000 875,000 2,625,000 25.0%
Depreciation Reserve 1,250,000 1,250,000 1,250,000 - 100.0%
Rate Stabilization Reserve 1,300,000 1,300,000 1,300,000 - 100.0%
Total Expenses 101,360,554 101,360,554 70,327,262 31,033,292 69.4%
Budget Balance - Working Capital 8,757,579 10,209,168 - 10,209,168 0.0%
Total Budget Balance & Expenses $ 110,118,133 $ 111,569,722 $ 70,327,262 $ 41,242,460 63.0%
Reserve Balances
Contingency Reserve $ 1,071,054 $ 1,071,054 $ 1,053,604
Insurance Reserve $ 408,503 $ 408,503 $ 402,281
Rate Stabilization Reserve $ 6,171,027 $ 6,171,027 $ 6,144,633
Bond Coverage Ratio (Covenant 1.25) 1.51 1.57 1.99
Megawatt Hours Sold & Purchased
Sales to Customers MWh (excluding Street Light MWh) 707,536 707,536 514,263
Sales per MWh $ 136.514 $ 136.514 $ 135.601
Purchased/Generated MWh 738,215 738,215 522,476
All In MWh Supply & Generation $ 91.561 $ 91.561 $ 90.102
Page 121
Page 6 of 10
City of Dover
Finance Department
Monthly Report – February 2011
General Capital Project Fund Summary
Revised 67% of
Budget Budget YTD Balance Budget
Beginning Balance - Projects $ 65,479 $ 227,592 $ 227,592 $ - 100.0%
Beginning Balance - Library $ - $ 34,583 $ 34,583 $ - 100.0%
Revenues
Transfer from General Fund for Projects 1,307,839 1,307,839 1,307,839 - 100.0%
State Grant - Library 3,343,520 4,232,348 557,166 3,675,182 13.2%
Police Grant 18,000 18,000 - 18,000 0.0%
Miscellaneous Receipts - - 5,130 (5,130) 0.0%
Library Bond Issue/Contributions 1,000,000 1,000,000 30,000 970,000 3.0%
Transfer from Library Reserve 2,343,519 2,363,732 - 2,363,732 0.0%
Transfer from Parkland Reserve - 36,872 28,629 8,243 77.6%
Transfer from Capital Asset Reserve 140,000 - - - 0.0%
Interest Earnings 10,900 10,900 2,560 8,340 23.5%
Income from Sale of Assets - - 20,012 (20,012) 0.0%
Total Revenues 8,163,778 8,969,691 1,951,336 7,018,355 21.8%
Total Beginning Balance & Revenue $ 8,229,257 $ 9,231,866 $ 2,213,511 $ 7,018,355 24.0%
Expenditures
Fire $ 288,210 $ 223,700 $ 221,786 $ 1,914 99.1%
Grounds Maintenance 63,675 63,675 46,149 17,526 72.5%
Library 6,687,039 7,630,663 867,840 6,762,823 11.4%
Recreation 45,000 81,872 38,453 43,419 47.0%
Police 282,380 335,880 231,925 103,955 69.0%
Streets 481,055 481,055 345,836 135,219 71.9%
Sanitation 246,075 246,075 212,369 33,706 86.3%
Information Technology 12,000 12,000 6,680 5,320 55.7%
Mayor 31,500 31,500 17,325 14,175 55.0%
Total Expenditures 8,136,934 9,106,420 1,988,363 7,118,057 21.8%
Budget Balance - Projects 92,323 125,446 - 125,446 0.0%
Total Budget Balance & Expenditures $ 8,229,257 $ 9,231,866 $ 1,988,363 $ 7,243,503 21.5%
Reserve Balances
Capital Asset Replacement Reserve $ 116,465 $ 256,645 $ 252,758
Library Reserve $ 1,243,686 $ 1,217,579 $ 3,249,843
Parkland/Recreation $ 185,045 $ 191,522 $ 196,158
Page 122
Page 7 of 10
City of Dover
Finance Department
Monthly Report – February 2011
Water/Wastewater Improvement & Extension Fund Summary
Revised 67% of
Budget Budget YTD Balance Budget
Beginning Balance - Water $ 743,431 $ 1,590,874 $ 1,590,874 $ - 100.0%
Beginning Balance - Wastewater $ 257,168 $ (45,665) $ (45,665) $ - 100.0%
Beginning Balance - Bond Proceeds - Wastewater $ 286,500 $ - $ - $ - 0.0%
Revenues
Bond Issue Proceeds Series 2010 3,016,200 3,016,200 - 3,016,200 0.0%
Income from Sale of Assets - - 10,196 (10,196) 0.0%
Interest Earned - - 22,742 (22,742) 0.0%
State Loan-Water - 2,404,017 65,770 2,338,247 2.7%
State Loan-Wastewater - 5,597,956 2,500,786 3,097,170 44.7%
Transfer from Water Operating Fund for Water 500,000 500,000 500,000 - 100.0%
Department of Energy Grant - 45,248 - 45,248 0.0%
Transfer from Wastewater Operating Fund for Wastewater 500,000 500,000 500,000 - 100.0%
Transfer from Impact Fee Reserve - Wastewater 242,040 758,821 - 758,821 0.0%
Total Revenues 4,258,240 12,822,242 3,599,494 9,222,748 28.1%
Total Beginning Balance & Revenues $ 5,545,339 $ 14,367,451 $ 5,144,703 $ 9,222,748 35.8%
Expenses
Water $ 620,000 $ 3,605,055 $ 465,891 $ 3,139,164 12.9%
Wastewater 1,560,700 7,075,994 2,517,829 4,558,165 35.6%
Total Expenses 2,180,700 10,681,049 2,983,720 7,697,329 27.9%
Budget Bal-Working Capital - Wastewater Bond Proceeds 2,153,140 2,153,140 - 2,153,140 0.0%
Budget Balance - Working Capital - Water 623,431 889,836 - 889,836 0.0%
Budget Balance - Working Capital - Wastewater 588,068 643,426 - 643,426 0.0%
Total Budget Balances 3,364,639 3,686,402 - 3,686,402 0.0%
Total Budget Balances & Expenses $ 5,545,339 $ 14,367,451 $ 2,983,720 $ 11,383,731 20.8%
Reserve Balances
Capital Asset Replacement - Water $ 319,003 $ 318,113 $ 314,870
Capital Asset Replacement - Wastewater $ 168,767 $ 168,476 $ 167,527
Page 123
Page 8 of 10
City of Dover
Finance Department
Monthly Report – February 2011
Electric Improvement & Extension Fund Summary
Revised 67% of
Budget Budget YTD Balance Budget
Beginning Balance $ 1,688,861 $ 3,429,624 $ 3,429,624 $ - 100.0%
Beginning Balance Bond $ - $ 415,585 $ 415,585 $ - 100.0%
Revenues
Interest Earnings 40,700 40,700 9,694 31,006 23.8%
Transfer from Electric Revenue Fund 3,500,000 3,500,000 875,000 2,625,000 25.0%
Insurance Claim Proceeds - 280,000 265,643 14,357 94.9%
Department of Energy Grant - 135,152 207,127 (71,975) 153.3%
Income from Sale of Assets - - 11,888 (11,888) 0.0%
State Reimbursement for Governor's Ave - 254,757 - 254,757 0.0%
Total Revenues 3,540,700 4,210,609 1,369,352 2,841,257 32.5%
Total Beginning Balance & Revenues $ 5,229,561 $ 8,055,818 $ 5,214,561 $ 2,841,257 64.7%
Expenses
Power Plant $ 1,480,068 $ 2,156,740 $ 1,523,971 $ 632,769 70.7%
Transmission/Distribution 739,000 739,000 345,506 393,494 46.8%
Electrical Engineering 1,390,429 1,598,982 988,906 610,076 61.8%
Transfer to Depreciation Reserve - 1,000,000 1,000,000 - 100.0%
Total Expenses 3,609,497 5,494,722 3,858,383 1,636,339 70.2%
Budget Balance - Working Capital 1,620,064 2,561,096 - 2,561,096 0.0%
Total Budget Balance & Expenses $ 5,229,561 $ 8,055,818 $ 3,858,383 $ 4,197,435 47.9%
Reserve Balances
Depreciation Reserve $ 9,572,390 $ 10,513,555 $ 10,388,660
Future Capacity Reserve $ 9,294,563 $ 9,294,627 $ 9,154,788
Page 124
Page 9 of 10
City of Dover
Finance Department
Monthly Report – February 2011
Community Transportation Improvement Fund
Revised 67% of
Budget Budget YTD Balance Budget
Beginning Balance $ 100,913 $ 309,854 $ 309,851 $ 3 100.0%
Revenues
Grants Revenue 1,000,000 1,000,000 235,211 764,789 23.5%
Transfer from General Fund 300,000 300,000 300,000 - 100.0%
Interest Earned 2,800 2,800 260 2,540 9.3%
Total Revenues 1,302,800 1,302,800 535,471 767,329 41.1%
Total Beginning Balance & Revenues $ 1,403,713 $ 1,612,654 $ 845,322 $ 767,332 52.4%
Expenses
Program Expenses - Grant related $ 1,000,000 $ 1,000,000 $ 491,539 $ 508,461 49.2%
Program Expenses - City appropriated 300,000 300,000 179,271 120,729 59.8%
Total Expenses 1,300,000 1,300,000 670,810 629,190 51.6%
Budget Balance - Working Capital 103,713 312,654 - 312,654 0.0%
Total Budget Balances & Expenses $ 1,403,713 $ 1,612,654 $ 670,810 $ 941,844 41.6%
Page 125
Page 10 of 10
CITY OF DOVER
SPECIAL REVENUE FUNDS
COMBINING STATEMENT OF REVENUES, EXPENDITURES
AND CHANGES IN UNRESERVED FUND
PERIOD ENDED FEBRUARY 28, 2011
CDBG/NSP GIRLS CIRCLE & SUBSTANCE
POLICE LIBRARY HOUSING GAMES GRANT ABUSE PREV.
GRANTS GRANTS GRANTS OF DOVER GRANT TOTALS
REVENUES:
State Grants received $ 100,954 $ 4,000 $ - $ - $ 29,048 $ 134,002
Federal Grants received 137,880 124,498 538,269 31,453 - 832,100
Recreation revenue - - - - 4,935 4,935
Miscellaneous revenue (5,130) - - - - (5,130)
Investment income (loss) 381 - - - - 381
TOTAL REVENUES $ 234,085 $ 128,498 $ 538,269 $ 31,453 $ 33,983 $ 966,288
EXPENDITURES:
Program expenditures $ 120,570 $ 110,139 $ 459,054 $ 24,751 $ 92,998 $ 807,512
TOTAL EXPENDITURES $ 120,570 $ 110,139 $ 459,054 $ 24,751 $ 92,998 $ 807,512
Excess (deficiency) of revenues over
expenditures $ 113,515 $ 18,359 $ 79,215 $ 6,702 $ (59,015) $ 158,776
Other financing sources (uses):
Operating transfers-out (95,389) - (136,557) - - (231,946)
Excess (deficiency) of revenues and
other financing sources over
expenditures & other uses $ 18,126 $ 18,359 $ (57,342) $ 6,702 $ (59,015) $ (73,170)
UNRESERVED FUND BALANCE
AT BEGINNING OF YEAR $ 315,736 $ 35,505 $ 61,672 $ - $ 10,710 $ 423,623
UNRESERVED FUND BALANCE
AT END OF YEAR $ 333,862 $ 53,864 $ 4,330 $ 6,702 $ (48,305) $ 350,453
Notes:
Substance Abuse Prevention Grant: Negative Fund Balance is due to timing, the revenues are on a reimbursement basis.
Page 126
Dover Police Department
Monthly Report
To
Mayor & City Council
“To Protect and Serve”
February 2011
Page 127
March 14, 2011
Honorable Carleton E. Carey, Sr., Mayor
Members of Dover City Council
City Hall
Dover, DE 19901
Mayor Carey and Council Members:
The following is the report on Police Department activities for the month of February 2011:
COMPLAINTS
Total complaints received through February 28th 6,000
numbered 4,837. This is an increase of 573 4,837
complaints over the same time period for last year. 4,525 4,544
4,043 4,264
4,000
2,000
0
2007 2008 2009 2010 2011
CRIMINAL INVESTIGATIONS
15
Cases Reported in
9
10 February
6 Cases Cleared in
4 4 February
5 Cases Cleared from
2
1 1 Previous Months
0 0
0
Burglary Robbery Rape
Page 128
Report to Mayor and Council
February 2011
Page 2
QUALITY OF LIFE TASK SECTION
ENFORCEMENT ACTION ARRESTS
ABANDONED VEHICLES 0
ALCOHOL VIOLATIONS/DUI’S 6
ASSIST OTHER 0
WARRANTS ON FILE 0
BIKE ON SIDEWALK 0
CITY PARK VIOLATIONS 0
CRIMINAL ARRESTS 47
DRUG RELATED ARRESTS 35
LOUD MUSIC 1
MISCELLANEOUS VIOLATIONS 9
PARKING VIOLATIONS 5
PEDDLER 0
MEETINGS 37
PROSTITUTION 0
COLLECTION OF DELINQUENT DCO’S 0
WANTED CHECKS/CPC’S 27
TRAFFIC ARRESTS 102
WARNINGS 27
FUGITIVE 17
TOTAL ARRESTS 313
TRAFFIC ARRESTS 6,000
The department issued 3,478 traffic citations through this 3,705 3,478
reporting period. This is an increase of 303 citations over the 4,000 3,020 3,175
number issued during the same period last year. 2,739
2,000
0
2007 2008 2009 2010 2011
TRAFFIC CRASHES
Through February 28th, Dover Police investigated 276 traffic crashes. This is a decrease of 24 accidents investigated during the
same period last year.
400
331
301 280 300 276
300
200
100
0
2007 2008 2009 2010 2011
Page 129
Report to Mayor and Council
February 2011
Page 3
911 CENTER
10%
During the month of February, our 911 Center
handled a total of 8,557 calls averaging 249 calls per
911 Landline day. Dispatchers handled 1,961 calls on the 911
23% wireless lines, an average of 71 calls per day and 845
911 Wireless
calls on the 911 landlines, an average of 31 calls per
67%
Administrative day.
CITY ORDINANCE SUMMONS 2,000
1,693
1,523 1,323
th
Through February 28 , we issued 1,323 city ordinance 1,500 1,238
summons, an increase of 229 summons over February of 882 1,065 1,049 1,094
last year. *Note: of those summonses issued in February, 1,000 800
686
24 were issued for handicapped parking violations, 38 for
fire lane parking violations, 14 for false alarms (10 for 3-5 500
alarms, 3 for 6-9 alarms, 1 for 10-15 alarms, and 0 for 16
or more alarms) and 13 for noise violations (8 for vehicle
0
violations and 5 for residence violations). 2007 2008 2009 2010 2011
ISSUED PAID
Listed below are the major crimes and activities that occurred during the month of February:
• On February 1, 2011, three black male suspects entered a victim's unsecured room at a local motel and beat him about
the head and face with their fists, feet, and a broom stick causing injury. They then duct taped the victim's head and
removed his bass guitar, silver bracelet, diamond ring, and a watch. The suspects fled in a gray Dodge minivan.
• On February 2, 2011, Dover Officers arrested a suspect after investigation revealed that on January 20, 2011 he
sexually assaulted a 16 year old female whom he was transporting from a doctor's appointment. The suspect was an
employee of a transportation service which is based out of Smyrna. While transporting the victim, the suspect drove the
victim to Country Village Apartments in Dover and sexually assaulted her in one of the apartments. Due to the fact that
the suspect was responsible for the child during the transport, he was also charged with Sexual Abuse of a Child by a
Person of Trust.
• On February 2, 2011, Dover Detectives made two arrests stemming from the shooting of a Dover man on January 25,
2011. Investigation revealed that the male suspect was fighting with the victim when his sister shot him. Both suspects
were arrested
• On February 10, 201, Dover Officers with the assistance of the United States Marshalls apprehended a subject, who
had active warrants for the rape of a 10 year old. The warrants were from a case that Dover Detectives were
investigating.
• On February 9, 2011, Officers assigned to the Drugs, Vice, and Organized Crime Section along with officers assigned
to the Safe Streets Section executed a search warrant at a residence in the Simon Circle Community. Upon searching
the residence, officers located 5.1 grams of cocaine, 7.9 grams of marijuana, money, and drug paraphernalia. As a
result of the investigation, male and female defendants were arrested.
Page 130
Report to Mayor and Council
February 2011
Page 4
Major crimes and activities that occurred during the month of February continued:
• On Wednesday February 9, 2011, a subject fled from Dover Officers who were attempting to serve warrants. He got in
a vehicle and fled the scene committing numerous traffic violations. Defendant crashed into a parked vehicle at a local
credit union and then rammed a police car before being apprehended.
• On February 10, 2011, Dover Officers responded to a burglary in progress at a church located on North Queen Street.
Officers arrived on scene and observed a suspect at the rear door of the church holding a 50" Flat screen Television. He
fled from officers but was apprehended after a short foot chase.
• On February 13, 2011, Dover Officers arrested a suspect for three burglaries which occurred between February 3, 2011
and February 5, 2011, where businesses were broken into and keys and other items were removed. These burglaries
occurred at three car repair/detailing businesses. Three vehicles were stolen as well as items removed from within
others. All three vehicles have been recovered.
• On February 14, 2010, a 24 year old male victim was meeting with a friend in Water Street Alley. The victim's friend
left the area at which time the victim was approached by a black male suspect wearing dark clothing. The suspect
produced a handgun and demanded money from the victim. The victim fled on foot towards his car and was shot by the
suspect in his left calf. Investigation is still pending.
• Dover Detectives are currently investigating a burglary to a restaurant located on South Dupont Highway. The burglary
occurred sometime between February 14, 2011 and February 15, 2011. An unknown suspect forced entry through a
glass door and removed an undetermined amount of cash from the register before fleeing.
• Dover Detectives are currently investigating a burglary at a liquor store located on Bay Road. The burglary occurred on
Tuesday, February 15, 2011. An unknown suspect removed a front window and removed an undetermined amount of
cash and two cash registers before fleeing.
• On February 15, 2011, a suspect entered into a residence on Whatcoat Drive, where his estranged girlfriend resides.
The suspect then kicked in a bedroom door and began to assault the victim, dragging her by her hair into the living
room. He then proceeded to strangle the victim, later stealing her cell phone, and fleeing prior to officers arriving on
scene. The crime was witnessed by two children in the residence. Warrants were obtained for the suspect.
• On February 26, 2011, the Dover Police Department hosted a “How to Succeed” seminar. The seminar was designed
for those who are currently in the hiring process and for those who may be considering a career in law enforcement.
The seminar outlined the hiring process from submitting the initial application to being selected for the police academy.
Respectfully Submitted,
James E. Hosfelt, Jr.
Chief of Police
Page 131
Monthly Report
February 2011
Office of City Assessor
Page 132
Assessor’s Report
Major Updates
Dec‐10 Jan‐10 Feb‐11
Assessment Change $2,262,800 ‐$7,663,600 $7,531,800
Residential Sales Ratio Report
Sales in Study Total Assessed Value Total Sale Price Ratio PRD
10 $1,628,300 $1,741,960 0.93 1.00
Ratio – Assessed Value divided by Sale Price.
1
Page 133
Assessor’s Report
PRD – Mean – A PRD above 1.03 tends to indicate assessment regressivity – high valued properties are under appraised
relative to low valued properties. A PRD below .98 tends to indicate assessment progressivity – high valued properties
are relatively over appraised.
Points of Interest
Scanning & Filing
‐ All new deeds are being scanned and attached to the CAMA software for easy retrieval.
‐ All appeal documents and correspondence are being scanned and attached to the CAMA software for easy retrieval.
Assessor’s Office
‐ Changed 196 Commerce Way to exempt status, was purchased by Capital School District.
‐ Construction of New Facility Ordinance and Amendment to Annual Valuation and Assessment Ordinance, final reading
February 14, 2011
‐ Mailed out 566 Senior Citizen Property Tax Reduction Forms and 48 Disability Tax Reduction Forms.
2
Page 134
City of Dover Sales Ratio Report for February 2011
Total
Assesesed
PARID Address Val. Sales DT Price ASR
ED05‐057.17‐01‐15.00 35 GRISTMILL DR 139,600 28‐Feb‐11 135,000 1.03
ED05‐066.02‐01‐06.00 121 HOBBYHORSE CT 230,800 25‐Feb‐11 250,405 0.92
ED05‐067.14‐04‐17.00 39 PIN OAK DR 198,300 2‐Feb‐11 240,000 0.83
ED05‐085.08‐01‐13.00 1186 OAK DR 164,300 7‐Feb‐11 168,400 0.98
ED05‐076.10‐02‐18.00 17 MIFFLIN RD 173,200 2‐Feb‐11 162,000 1.07
ED05‐068.14‐01‐51.00 310 EISENHOWER DR 141,300 8‐Feb‐11 140,500 1.01
ED05‐076.03‐01‐01.00 4 CANNON MILL DR 185,500 16‐Feb‐11 240,000 0.77
ED05‐068.14‐05‐86.000‐054 1001 WHITE OAK RD J22 37,800 17‐Feb‐11 50,000 0.76
ED05‐068.19‐05‐72.00 50 NICHOLAS DR 207,100 11‐Feb‐11 205,655 1.01
ED05‐077.13‐02‐61.00 36 SACKARACKIN AVE 150,400 11‐Feb‐11 150,000 1.00
1,628,300 1,741,960 9.37
Page 135
CITY MANAGER’S
MONTHLY REPORT
FEBRUARY 2011
City Manager’s Monthly Report, February 2011
Page 136
Customer Services
1,916 payments were processed online or by telephone in February 2011.
City of Dover property taxes were due August 31, 2010. As of February 28, 2011 the delinquent property taxes
total $662,706 for all tax years.
Budget and Program Development
Continued meetings with Customer Service staff to review implementation of the new utility bill design.
Participated in GFOA Webinars regarding Evaluating the Effectiveness of Performance Management and Best Prac‐
tices in Budgeting and Fiscal Policy.
Began meetings with departments to review Fiscal 2012 budgets.
First of several Budget Focus Group meetings held with representatives from local businesses.
Human Resources
FOP contract negotiations have begun.
Information Technology
Continued working on the upgrade of the City’s website.
Parks, Recreation, & Library
The Library recorded 590 people attending 23 children’s programs.
Sixteen teenagers attended three teen programs at the Library.
Seventy‐eight residents were recorded in Job Resource Center.
Public Services
Contractor for the Library Bid Pac A has completed approximately 85% of the contract work.
Began working on the Spring Street program bid documents and the Yard Waste plan.
Public Utilities
Water, Wastewater & Construction crews continued snow plowing efforts, with the Electric crews clearing the
Administration building parking lots.
Various personnel attended the Delaware Rural Water Conference in Harrington.
2 City Manager’s Monthly Report, February 2011
Page 137
PUBLIC AFFAIRS
Ci ti zen Acti on Center Ci ti zen Acti on Center
Number of Frequentl y As ked Ques ti ons Compl a i nts Regi s tered
200
500
402
400 379 368 378
356
300 150
332
309 312
300 263
252
222 100
186
200
50
100
0 0
Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb- Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
10 10 10 10 10 10 10 10 10 10 10 11 11 10 10 10 10 10 10 10 10 10 10 10 11 11
Planning/ Inspect ions Police Public Ser vices/ Public Works Public Ut ilit ies Sit e Admin/ Ot her
AVERAGE TIME TO CLOSE COMPLAINTS RECEIVED ‐ February 2011
Total #
Department # Of Days
Complaints
Planning/Code Enforcement
25 5.19 days
(property code violations)
Police (community policing) 3 10.2 days
Public Services
‐ Grounds 3
‐ Sanitation
2.86 days
1
‐ Streets 0
Public Utilities (electric outages) 2 2.7 days
Site Admin/Other Departments 2 0.45 days
COMMUNITY OUTREACH, TRAINING AND EDUCATION EVENTS ‐ February 2010
Assisted Public Services Director in the writing of four grants for recycling. Three of the four grants
have been approved totaling $101,000.
Met with DE Division of Prevention and Behavioral Health Services to develop program for the
Dover area.
Attended event with Japanese delegation “Healthy Myagi”.
Continued working with Delaware.net on the redesign and content of the website.
Participated in several meetings and inspections with the House of Pride.
Worked on public communications of programs for street closures coming up with
Water/Wastewater.
Completed and submitted Youth Advisory applications and recruitment information.
July Aug Sept Oct Nov Dec Jan Feb
OTHER ACTIVITIES FYTD
2010 2010 2010 2010 2010 2010 2011 2011
Facebook ‐ New Posts 21 26 54 41 52 59 57 38 348
Facebook ‐ Page Views 716 1,004 1,145 1,152 1,671 1,768 1,882 1,903 11,241
Facebook –Replies to
17 37 21 23 21 27 21 16 183
Questions
Press Releases 16 9 16 5 2 3 4 3 58
Ceremonial Documents 25 16 26 19 17 16 15 12 146
(Proclamations, Certificates, Letters of welcome)
City Manager’s Monthly Report, February 2011 3
Page 138
CENTRAL SERVICES
Fleet Operations & Maintenance Items on Hand with no Usage over 36 Months
80000 140 $1,000,000
70000 120
Total Work Orders
$800,000
60000 100
Total Dollars
50000 80
$600,000
40000 60
30000 40
$400,000
20000 20
10000 0 $200,000
Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Jan Feb Feb- M ar- Apr- M ay- Jun- Jul- Aug- Sep- Oct - Nov- Dec- Jan- Feb-
10 10 10 10 10 10 10 10 10 10 10 11 11 10 10 10 10 10 10 10 10 10 10 10 11 11
Total Dollars Tot al Work Orders Elect ric Wat er General
Work Orders: 83 Electric: $465,477.93
Fleet Maintenance: $18,653.61 (excludes Melvin’s Sunoco) Water: $ 25,393.08
Fuel: $42,071.44 General: $ 38,077.15
Stock Purchases by Fund Contingency & Warehouse Stock
500,000
$4,500,000 2,700
2,600
400,000
$4,000,000 2,500
Total Line Items
2,400
300,000
$3,500,000 2,300
Total Dollars
2,200
200,000
$3,000,000 2,100
2,000
100,000
$2,500,000 1,900
1,800
0
Feb- M ar- Apr- M Jun- Jul- Aug- Sep- Oct - Nov- Dec- Jan- Feb- $2,000,000 1,700
10 10 10 ay- 10 10 10 10 10 10 10 11 11 Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Jan Feb
10 10 10 10 10 10 10 10 10 10 10 10 11 11
Elect ric Wat er General Total Dollar Value Total Line It ems
Electric: $54,259.63 Total Dollar Value: $2,641,038.24
Water: $ 540.58 Total Line Items: 1,774
General: $ 9,344.91
Major Program Updates
MEASURE FEBRUARY 2011 FEBRUARY 2010 DIFFERENCE
Issue Effectiveness (>90%)
How often the warehouse has what cus‐
99.2% 99.3% ‐0.18%
tomers need when it’s needed.
[issues / (issues + back orders)] * 100
Turn Over Rate (4‐5 per yr.)
Indicates that the material stocked is the 1 every 9.2 years 1 every 18.2 years ‐8.98 years
material being used.
Bids for non‐inventory items converted to
11 of 12 Bids 7 of 7 Bids (FY10 Total)
purchase orders within timeframe ‐8.3%
91.7% 100%
(Quantity and Percentage)
Sealed bids prepared, received & distrib‐
30 of 32 Bids 36 of 38 Bids (FY10 Total)
uted within 7 working days of receipt ‐1.0%
93.7% FYTD 94.7%
(Quantity and Percentage)
Scheduled Preventative Maintenance
25 of 27 appointments kept 9 of 32 appointments kept
appointments being kept. 64.5%
92.5% 28%
(Quantity and Percentage)
399,185 pieces
Mail receiving lowest discounted rate 226,942 pieces
(FY10 Total) 0.8%
(Quantity and Percentage) 96.7%
95.9%
Routine work orders completed within 5 33 work orders completed 32 work orders completed
2.9%
days (Quantity and Percentage) 94.2% 91.4%
Emergency work orders completed within 3 work orders completed 6 work order completed
‐
2 days (Quantity and Percentage) 100% 100%
4 City Manager’s Monthly Report, February 2011
Page 139
CUSTOMER SERVICES
WORK ORDERS PROCESSED EXTENSIONS OF CREDIT
3,500
900 833
783 765
3,000 800 714 729
700 628 612 632
2,500 2,262 556
600 547 523 539
1,984 1,970 1,972 468
2,000 1,833 1,825 500
1,709 1,689
1,540
1,399 1,459
1,325 1,361
400
1,500
300
1,000 200
100
500
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2011 2011
2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2011 2011
CUSTOMER PAYMENT USAGE CUTSFORNONPAYMENT
$1,800,000
120,000 109,927108,994 $1,600,000
100,000 $1,400,000
$1,200,000 $1,137,331
80,000
$1,000,000 $831,683
60,000 43,444
42,699
$800,000
40,000 22,812
19,867
15,267 15,775
$600,000
20,000
95 85 $400,000
0 $122,959 $161,151
$200,000
Drive‐Thru Over the Mail, Drop Credit Cards Bank Drafts
$‐
Window Counter Box
2011 YTD 2010YTD February2011 February2010 FYTD11 FYTD10
FY 2011 FY 2010
Major Program Updates Feb 2011 Feb 2010 Difference
Year‐to‐Date Year‐to‐Date
Number of Customers Served 22,483 22,473 10 198,548 191,432
Final Bills 588 512 76 5,179 4,813
Estimated Bills 141 165 (24) 1,155 1,147
Penalties Posted $ 10,340 $ 17,731 $ (7,391) $ 171,867 $ 142,487
Extensions of Credit ‐ Amount Extended $ 197,136 $ 157,538 $ 39,598 $ 1,594,284 $ 1,300,730
Balance Transfers $ 251 $ 3,377 $ (3,126) $ 18,888 $ 32,030
Utility Collections $ ‐ $ 18,687 $ (18,687) $ 184,509 $ 172,200
Special Assessments $ 225 $ 110 $ 115 $ 7,559 $ 32,666
Miscellaneous Billings $ 76,383 $ 26,408 $ 49,975 $ 944,039 $ 811,279
CNP through Disconnect Collars 20,038 ‐ 20,038 64 98
Court Cases 1,100 ‐ 1,100 ‐ ‐
Tamperings 2 2 ‐ 31 25
Taxes Levied $ 804,824 $ ‐ $ 804,824 $ 2,680,473 $ 9,821,008
Billing Adjustments $ 8,753 $ 774 $ 7,980 $ (275,314) $ 138
Total Taxes Collected $ 45,764 $ 63,618 $ (17,855) $ 9,732,456 $ 9,379,880
Taxes Outstanding $ 662,707 $ 398,234 $ 264,473 $ 6,909,596 $ 419,456
Payments in Lieu $ 1,500 $ 1,500 $ ‐ $ 12,000 $ 12,000
Billing Accuracy (on schedule billings) 99.0% 99.0% ‐ 99.0% 99.0%
Bills Published on Schedule 99.9% 99.9% ‐ 99.9% 99.9%
Meters Read on Schedule 99.9% 99.9% ‐ 99.9% 99.9%
Customer Satisfaction Rating 99.7% 99.7% ‐ 99.7% 99.7%
Deliquent Accounts Collected 99.8% 99.7% ‐ 99.8% 99.7%
City Manager’s Monthly Report, February 2011 5
Page 140
HUMAN RESOURCES
Customer Service Contacts Payroll Hours
700 5,000
600 4,500
4,000
500
3,500
400 3,000
300 2,500
200 2,000
1,500
100
1,000
0
500
Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Jan Feb 0
10 10 10 10 10 10 10 10 10 10 10 11 11
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
10 10 10 10 10 10 10 10 10 10 10 11 11
Cit izens Assisted 20 25 68 55 50 42 103 150 134 38 12 147 46
Employees Assisted 37 70 97 172 85 78 79 97 68 135 75 62 55 Overtime 1,556 1,415 1,602 1,316 1,779 1,874 1,257 1,257 1,049 593 1,505 2,200 662
Applicat ions Processed 35 0 2 0 75 4 482 259 273 3 0 235 24 Sick 2,173 3,320 1,969 961 732 1,749 1,466 1,393 1,300 1,451 1,896 1,946 2,645
Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb
Category Total
10 10 10 10 10 10 10 10 10 10 10 11 11
*
Caucasian 320 318 315 315 315 314 314 315 319 312* 311 313 314 N/A
*
Minorities 61 61 61 62 63 62 62 62 62 61* 61 61 61 N/A
Hired ‐ 1 ‐ 2 2 ‐ 2 1 4 1 ‐ 2 1 16
Terminated/Resigned/
‐ 3 4 1 1 2 2 1 ‐ 3 1 ‐ ‐ 18
Retired
Promoted 2 1 6 3 ‐ 1 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 13
Jobs Posted 3 3 ‐ 3 ‐ 2 3 4 1 ‐ ‐ 3 ‐ 22
Workers Comp. Injuries 2 2 3 4 8 5 6 3 5 2 5 7 2 54
Workers Comp. Hours 50 186 358 299 123 11 9 ‐ 24 65 42 360 445 1,972
Insurance Claims 10 9 6 7 10 8 2 8 3 4 8 3 3 81
Full‐time Employees: 359 Part‐time Employees: 16 (4 Pitts Center, 1 Recreation, 11 Library)
* Total full‐time, Caucasian and Minority employees were adjusted due to an audit of employee information.
Numbers do not reflect, temporary, seasonal, relief fire dispatchers, committee or council members.
Hired: Assistant Library Director
Recruitment Information
American
Asian/Pacific In Out
Position Total Female Male Black White Hispanic Indian/Alaskan Unknown
Islander Dover Dover
Native
Groundworker I 105 2 103 19 79 4 1 1 1 36 69
Operations/Construction
52 1 51 1 41 2 0 1 7 11 41
Manager (Public Utilties)
LAN Analyst 21 1 20 3 15 0 0 1 2 7 14
6 City Manager’s Monthly Report, February 2011
Page 141
HUMAN RESOURCES
continued
Unfilled/Open Positions by Department
Unfilled/Open Positions Apr May Jun July Aug Sept Oct Nov Dec Jan Feb
By Department 10 10** 10 10 10 10 10 10 10 11 11
Public Utilities 12 12 11 12 5 3 3 3 4 4 4 4
Public Services 3 4 4 1 2 2 2 1 2 1 1
Police 56 5 5 3 2 2 2 2 3 3 2 2
All Other Departments 10 10 11 12 5 6 6 3 4 4 4 3
Totals 30 31 31 31 13* 13 13 10 12 13 11 10
30
Public Utilities: Grounds Worker (1), Motor Equipment Operator II/Water (1), Construction & Inspection Manager (1), and Engineering Fieldman Crew Leader (1)
Public Services: Emergency Management Coordinator (1)
Police: Police Master Corporal (1) and Patrolman (1)
All Other Departments: Custodian I (1), Programmer Analyst (1), and Sr. LAN Analyst (due to A. Siegel currently acting as IT Director)
Feb Mar Apr May Jun July Aug Sept Oct Nov Dec Jan Feb
Bonus Program Category Total
10 10 10 10 10 10 10 10 10 10 10 11 11
Stop Program‐Sensibly Taking Off
Pounds(weigh‐ins)
‐ 20 24 41 42 42 29 10 5 13 7 ‐ 27 260
Caught Doing it Right‐Promotes
employees productivity & ‐ ‐ ‐ ‐ ‐ 2 3 1 ‐ 2 63 ‐ ‐ 71
creativity (submissions)
Breathe Program‐Rewards for
‐ ‐ ‐ 1 1 ‐ ‐ ‐ ‐ ‐ 4 ‐ ‐ 6
ending tobacco use (submissions)
Ducs in a Row‐Doing Useful
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Community Service (submissions)
Workers Comp Injuries
Workers Comp Hours
500 20
400
15
300
200 10
100
5
0
Feb- M ar- A pr- M Jun- Jul- A ug- Sep- Oct- N Dec- Jan- Feb- 0
10 10 10 ay-10 10 10 10 10 10 o v- 10 11 11
Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb-
10
10 10 10 10 10 10 10 10 10 10 10 11 11
Public Utilit ies Public Services Police Others
Public Utilit ies Public Services Police Others
Public Utilities: 160 Public Services261 Police: 24 All Other Depts.: 0 Public Utilities: 0 Public Services: 0 Police: 2 All Other Depts.: 0
City Manager’s Monthly Report, February 2011 7
Page 142
INFORMATION TECHNOLOGY
Service Requests Resolved Citizen Action Center ‐ Customers w/ New Issues
200 182 177 171 200
163
153 151 153 153 150 154
150 127 124
119 120 125 150
108
100 100 79 66
59 54
50 43 44 37
50 32 32 33
0 0
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
10 10 10 10 10 10 10 10 10 10 10 11 11
10 10 10 10 10 10 10 10 10 10 10 11 11
Programming Requests Completed Page Views ‐ City of Dover Web Page
40 80,000
34
35 70,000
30 25 60,000
24
Pages View ed
25 20 50,000
19
20
69,485
16
66,869
15 15 15 40,000
61,049
14
15 11 10 30,000
36,994 38,684 39,610 39,576 35,631 34,959 38,777 36,358
33,649
10
30,819
20,000
3
5 10,000
0 0
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐ Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
10 10 10 10 10 10 10 10 10 10 10 11 11 10 10 10 10 10 10 10 10 10 10 10 11 11
Same
Current Last
Performance Indicators Month
Month Month
Last Year
iSeries Availability 100% 100% 100%
Server Availability 100% 100% 100%
AS/400 Connections
N/A N/A N/A
(concurrent/authorized users)
PCs Supported 334 336 340
Scheduled PCs Replaced ‐ ‐ ‐
Servers Supported 15 15 16
People Trained 5 12 19
Availability Statistics based on 7:00 AM until 5:00 PM Monday—Friday
8 City Manager’s Monthly Report, February 2011
Page 143
PARKS, RECREATION & LIBRARY
Library
Adult Services Children Services
1200 1000
1000
750
800
600 500
400
250
200
0 0
Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb- Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb-
10 10 10 10 10 10 10 10 10 10 10 11 11 10 10 10 10 10 10 10 10 10 10 10 11 11
Reference Reader's A dviso ry Outreach Electro nic A ssistance Reference Reader's A dviso ry Outreach Electro nic A ssistance
Reference: 158 Reader’s Advisory: 8 Reference: 163 Reader’s Advisory: 55
Outreach: 0 Electronic Assistance: 72 Outreach: 0 Electronic Assistance: 38
CIRCULATION FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Dover Residents 15,716 135,688 13,240 120,420
Kent County Residents* 14,607 120,876 13,741 120,536
Non‐County Residents 1,603 11,835 1,295 9,828
REGISTRATIONS
Dover Residents 198 1,833 168 1,837
Kent County Residents* 70 767 93 1,117
Non‐County Residents 7 81 7 132
OTHER
Visiting Patrons 28,971 244,909 27,498 257,933
Meeting Room Usage 400 2,020 360 2,040
Photocopier Usage 1,680 12,552 1,682 12,879
Dial‐A‐Story 980 9,328 1,118 11,633
Computer Usage 3,889 35,312 3,409 27,683
Holds (Total) 28,971 244,909 27,498 257,933
*Breakout of Kent County Residential Statistics
Circulation Registrations
Harrington: 100 Harrington: 1
Smyrna: 1,016 Smyrna: 7
Milford: 207 Milford: 0
Outside City Limits: 13,284 Outside City Limits: 62
Total Registered Users: (Card Holders)
City: 17,563 Kent County: 13,886 Outside Kent County: 1,700
Other Points of Interest:
Interlibrary: 4,315 items loaned out Technical services: 1,567 items added
3,133 items borrowed 527 items deleted
Volunteers: 322 hours of service completed
City Manager’s Monthly Report, February 2011 9
Page 144
Parks and Recreation
Recreation Revenue Recreation Revenue Breakdown
30000
$ 35,000
25000
$ 30,000
20000
$ 25,000
$ 20,000 15000
$ 15,000 10000
$ 10,000
5000
$ 5,000
0
$0
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
Feb‐ Mar‐ Apr‐ May‐ Jun‐ Jul‐ Aug‐ Sep‐ Oct‐ Nov‐ Dec‐ Jan‐ Feb‐
10 10 10 10 10 10 10 10 10 10 10 11 11
10 10 10 10 10 10 10 10 10 10 10 11 11 General Rent al Payment s Sports Leagues Trips
General: $2,365 Rental Payments: $2,120 Sports: $456
Leagues: $3,645 Trips: $1,300
Rentals FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Baseball/Softball Field Rentals* ‐ 111 ‐ 108
Dover Park Pavilions (2) ‐ 18 ‐ 18
Multipurpose/Field Hockey Field Rentals* ‐ 54 ‐ 44
Recreation Center – Dover Park 5 114 8 71
Silver Lake Pavilions (2) / Schutte (1) ‐ 34 1 31
Soccer Field Rentals* ‐ 9 ‐ 10
Stage – Mobile Platform ‐ 19 3 16
*These numbers reflect groups that utilized our facilities during February.
Program Attendance* FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Learn N Play (All Sports) 6 6 Not Offered at Dover Park
*This number reflects activities that took place in February. (Not included on the JWP report.)
Pitts Center ‐ Total Program Attendence
FREE Open Gym Registration Cards* ‐ through 2/28/2011
Total Cards Issued: 4,056
20,000
City Residents: 1,838 ‐ (45%)
12,692
Non‐City Residents: 2,218 ‐ (55%)
10,306
15,000 ‐ Kent County: 1,796 ‐ (44%)
# of people
‐ Sussex County: 143 ‐ (4%)
10,000
7,374 7,614 ‐ New Castle County: 96 ‐ (2%)
5,753
3,886
‐ Out of State: 183 ‐ (5%)
2,995 3,329
2,018 2,307 2,041 2,447
1,340
5,000
*The cards permit entrance to the facility during
0 scheduled Public Gym Periods at no charge.
Feb- M ar- A pr- M ay- Jun- Jul- A ug- Sep- Oct- No v- Dec- Jan- Feb-
10 10 10 10 10 10 10 10 10 10 10 11 11
10 City Manager’s Monthly Report, February 2011
Page 145
PUBLIC SERVICES
Administration
Administrative review and inspection services continued on all residential and commercial developments.
The following residential subdivisions are in various phases of construction:
Oak Shadows Emerald Pointe Lexington Glenn
Village of Westover (Phase VI) Farthing Woods Nottingham Meadows
Patriot Village Clearview Meadows Village of Cannon Mill
Eden Hill (Residential)
Sanitation
Sanitation Hours
Monthly Total Refuse (Tons)
1200
1,500
1000
828
1,002 1,029 1,028 983 1,018 972
777
1,000 919 919 904 800
774 779
636 636 600 524
522 569 426 450
470 439
500 408 400
354 359 353 269
251 226
167 188 167
200 51 21
1 2
‐
0
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Bulk Collection Mechanized Hand Trash Container Electronic Goods
10 10 10 10 10 10 10 10 10 10 10 11 11 Collection Collection Repair/Delivery Pickup
Bulk Automated Feb 11 Feb 10
FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Trips to DSWA Sandtown Landfill 188 1,827 163 1,840
Total Tonnage to DSWA 917.53 9,403.72 802.08 9,983.82
90‐Gallon Containers Delivered 22 161 11 229
300‐Gallon Containers Delivered 7 37 1 24
Total Man Hours ‐ Containers Delivered 71 402 21 294
CURBSIDE RECYCLING TOTAL # OF TOTAL # OF
WEIGHT/LBS. AVG. LBS.
STATS HOUSEHOLDS ACCOUNTS
FEBRUARY 2011 15,696 7,848 223,540 14.24
City Manager’s Monthly Report, February 2011 11
Page 146
STREETS FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Signed Installed 35 171 10 144
Signs Repaired 38 175 6 104
Curbs Painted Yellow (Ft.) 100 933 ‐ 240
New Post Installed 14 64 3 51
Storm Catch Basins Repaired ‐ 30 ‐ 5
Storm Catch Basin Repairing (Hrs.) ‐ 196 ‐ 44
Hot Mix Patching (Tons) 2 95 ‐ 651
Hot Mix Patching (Hrs.) 4 352 ‐ 1,114
Cold Mix Patching Hrs.) 38 262 48 252
Concrete Work (Hrs) ‐ 221 ‐ 150
Concrete Patching (Cubic Yards) ‐ 37 ‐ 12
Street and Alley Maintenance (Hrs) 147 1,236 120 1,050
Ditch Work (Hrs). 0 65 ‐ 22
Street Sweeping (Miles) 962 6,639 126 6,540
Street Sweeping (Cubic Yards) 306 1,665 225 1,293
GROUNDS ‐ Arborist Crew FEBRUARY 2011 FEBRUARY 2010
Trees Trimmed 94 79
Trees Removed 19* 12
– *Removal of a large Box Elder tree at 35 N. New Street in order to make room for structure demolition.
– Most of the rest of the removals were dead trees.
– Trimmings were low limb street trees and in the alley around Wesley College.
Beautification Crew
– Cut back all ornamental grasses, perennials, and shrubbery.
– General clean up and washing down of all benches with bleach to ready for starting seeds in the greenhouse.
– Continued picking up Christmas trees.
Mowing Crews/Special Projects Crew
– Pulled the two Christmas trees off Silver Lake and one tree from Mirror Lake.
– Turned Christmas lights off on Loockerman Street.
– Continued leaf collection in the parks.
– Snow/ice removal from 4 miles of sidewalks after several snowfalls totaling 9 inches.
12 City Manager’s Monthly Report, February 2011
Page 147
Economic Development
UNEMPLOYMENT RATES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB
10 10 10 10 10 10 10 10 10 10 10 10 11 11
City of Dover 9.8% 10.3% 9.4% 9.4% 9.4% 10.2% 9.8% 10.2% 10.1% 10.3% 10.1% 9.4% 10.0% Pending
National & State averages (US‐9.0% & State‐8.5%) Source: State of Delaware Department of Labor
Number of contacts made with small businesses and with out‐of‐town companies interested in locating to Dover.
TYPE YTD Contacts Made
Small Businesses 11
Out‐of‐town Companies 10
A presentation regarding the Sun Park and other projects was given to the Colonial Rotary.
The semi‐annual update on Dover’s Top Employers was given to the Parks, Recreation and Community Enhance‐
ment Committee.
A Economic Data Group meeting was hosted by Economic Develop that invited Town Managers, Mayors, and Eco‐
nomic Development staff from Smyrna, Seaford, Milford and DEDO.
Staff met with Jeff Stone, from DEDO, who will be assisting with the development of a marketing strategy for the
Garrison Farm. Stall also met with Steve Kinion regarding Captive Insurance and Alan Levin to discuss the progress
of several economic development projects.
Downtown Dover Partnership
DDP received the Dover Transit Center Neighborhood Plan and Design Book which included a master plan for
downtown Dover and specific DDP‐owned properties. The plan was presented to Council on February 14, 2011 and
was unanimously approved.
The DDP Board authorized up to $50,000 for the completion of the next phase of the Chesapeake Supply Site
Brownfield Remediation. Funds were also approved for the installation of an additional security camera and larger
monitor, as a part of the Downtown Security Camera Project.
The Dover Branding project was started and discussions were held with several constituent groups to begin devel‐
opment of a “destination” logo for the City of Dover and Downtown.
City Manager’s Monthly Report, February 2011 13
Page 148
Life Safety
Inspections FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Fire Protection Inspections (new & existing) 66 445 40 220
Fire Code Inspections 63 758 47 471
Inspection Deficiencies 72 782 49 551
Certificate of Occupancy 1 40 6 65
Non‐Inspection Hours
Office 140 869 126 856
Meetings 35 341 35 308
Plan Review 48 342 14 383
Training ‐ 379 ‐ 362
Fire Investigations 6 138 84 284
Damage Cost
Accidental $52,000 $140,950 $11,800 $353,800
Incendiary $ 2,000 $194,550 $ 1,000 $134,300
Undetermined $ ‐ $ 22,600 $14,000 $ 43,000
Permitting and Inspections
Permits Issued FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Administrative Permit 3 15 3 19
Building Addition/Renovation Permits 23 371 17 308
Building Permits 6 81 10 81
Demolition Permits 6 22 5 32
Fence Permits 2 48 ‐ 51
Fire Prevention Permits 13 65 3 49
Mechanical Permits 21 200 17 279
Plumbing Permits 18 329 22 335
Sign Permits 18 162 18 183
Swimming Pool Permits ‐ 2 ‐ 1
Licenses Issued
Business Licenses 25 1,542 17 1,192
Merchant Licenses 1 276 4 282
Contractor Licenses 29 819 14 736
Lodging House Licenses 9 40 1 41
Mobile Homes 2 233 8 719
Public Occupancy 80 319 34 284
Rental Dwelling 688 2,468 588 2,341
Building Inspections
Permits Issued FEBRUARY 2011 FYTD 2011 FEBRUARY 2010 FYTD 2010
Building 245 2,925 247 2,922
Plumbing/Mechanical 320 2,938 92 1,900
Certificate of Occupancy 9 140 6 170
14 City Manager’s Monthly Report, February 2011
Page 149
Geographic Information Systems (GIS)
– Created and printed numerous maps for the City Clerk’s office.
– Refined and added map data to Water system and to the Storm Water system.
– Created ArcGIS mobile applications for Fire and Water Departments.
– Created and printed numerous maps, banners and posters for Downtown Dover Partnership.
– Created Dover Downs Slot Bank and Pit GIS floor plan.
Dangerous Building/Demolition Status – February 2011
66 Washington Street (Complete – No Further Action Required)
Declared dangerous by City Council on October 12, 2009.
Building permit obtained by property owner on February 5, 2010 and expired on August 5, 2010 with no inspections
scheduled or completed in relation to the building permit.
City will proceed with notifying property owner of our intent to conduct an asbestos survey and abatement and will
secure bids for demolition.
Demolition bids were received on December 7, 2010. Low bid authorized by City Manager.
Demolition was completed in February 2011. Paperwork to place lien on the property has been forwarded to
Administrative Services. Total cost was $8,376.85.
715 Slaughter Street (Complete ‐ No Further Action Required)
Declared dangerous by City Council on May 24, 2010.
Asbestos survey & report completed on October 1, 2010.
Asbestos abatement and removal completed on October 7, 2010.
Bids received on October 13, 2010.
Public Service Manager is awaiting receipt of bids from the City’s Contract and Procurement Manager. Low bid from
Sunnyfield Contractors in the amount of $2,950.00 approved by City Manager on October 19, 2010.
Demolition was completed in November 2010. Paperwork to place lien on the property has been forwarded to
Administrative Services. Total cost was $7,598.75.
628 N. West Street (Complete ‐ No Further Action Required)
Pool declared dangerous by City Council on August 23, 2010.
Demolition quotes received on October 12, 2010.
Low quote is currently being reviewed. Low bid from Sunnyfield Contractors in the amount of $3,900.00 has been
submitted to the City Manager for Authorization to Purchase.
Demolition was completed in November 2010. Paperwork to place lien on the property has been forwarded to
Administrative Services. Total cost was $3,900.00.
749 West North Street (Complete – No Further Action Required)
Declared dangerous by City Council on October 25, 2010.
Asbestos survey was conducted in December 2010.
Asbestos abatement was completed in January 2011.
Demolition bids received in January 2011.
Demolition was completed in February 2011. Paperwork to place lien on the property has been forwarded to
Administrative Services. Total cost was $15,780.34.
301 South Governors Avenue
Declared dangerous by City Council on October 25, 2010.
Asbestos survey was conducted in December 2010.
Asbestos abatement began in late January 2011.
Demolition bids received in January 2011.
Demolition was completed in February 2011.
35 North New Street
Declared dangerous by City Council on November 22, 2010.
Asbestos survey conducted on January 19, 2011.
Demolition bids were received in January 2011.
Asbestos abatement scheduled for February 3, 2011.
Demolition was completed in February 2011.
106 South New Street
Declared dangerous by City Council on February 14, 2011.
Asbestos survey is scheduled for March 2011.
Demolition quotes are due in March 2011.
City Manager’s Monthly Report, February 2011 15
Page 150
PUBLIC UTILITIES
Electric
System Peak Total System Load
200.0 100,000
85,805
164.1 164.0 78,221
90,000
160.2 74,934
155.7 80,000
66,434
63,563 64,474
60,764
128.1
150.0 70,000
56,857 57,103 56,052
54,090 54,947
52,792
112.9
60,000
107.7 108.2 104.8
104.0 104
98.1 94.75
50,000
100.0 40,000
30,000
20,000
50.0 10,000
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
10 10 10 10 10 10 10 10 10 10 10 11 11 10 10 10 10 10 10 10 10 10 10 10 11 11
Outages Customers of Gained/Lost
35 7,000 60
52
30 6,000 50 48
25 5,000
40
Outages Customers
20 4,000
30
15 3,000 24
10 2,000 20 17
13
11 11 10
5 1,000 9 9 8 8
10 5
0 0
0
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
10 10 10 10 10 10 10 10 10 10 10 11 11 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb
Outages Customers 10 10 10 10 10 10 10 10 10 10 10 11 11
Outages: 3 Customers: 154
Electric Monthly Outage Report
The annual outage goal will be less than 295 minutes per customer, which is a Delaware Standard. This will be measured by
calculating the System Average Interruption Duration Index.
FY 11 YTD FY 10 FY 09
72.17 160.14 155.17
Controllable Outages Average Response Time
Annual goal is less than 40 Goal is less than 30 minutes
Month Year‐to‐date Month Year‐to‐date
2 29 18 Minutes 40.98 Minutes
16 City Manager’s Monthly Report, February 2011
Page 151
ELECTRIC ENGINEERING DESIGN
Major Program Updates FEBRUARY 11 FEBRUARY 10 DIFF FY11 YTD FY10
Extensions Design Completed Within 30 days
0 0 ‐ 0 0
of complete Submission
New Underground Installation % Completed New Underground Installation % Completed
Kent General Hospital Ongoing Farthing Woods Ongoing
Crossgates Development Ongoing Buchanan Acres Ongoing
PROGRAM UPDATES FEB 11 FEB 10 FY11 YTD
Tree Trimming 206 113 1558
Number of Oil Releases 0 1 5
Lost Time Accidents – All Electric Utility Divisions 0 0 0
New Services 17 5 92
Major Goals Completed in the Past Two Months
CT/PT & Breaker change out completed at McKee Substation
City Manager’s Monthly Report, February 2011 17
Page 152
Water/Wastewater
Water Production/Billed Consumption/Flow to Kent County
300,000,000
250,000,000
200,000,000
150,000,000
100,000,000
50,000,000
0
Feb 10 Mar 10 Apr 10 May 10 Jun 10 Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11
Total Water Prod. Billed Consumpt. Total Flow to County City Readings
ENGINEERING SUMMARY
Major Program Updates FEBRUARY 11 FEBRUARY 10 DIFF FY11 YTD FY10
State and Federal Violations 0 violations 0 violations ‐ ‐ ‐
Water Quality Complaints 1 8 ‐10 79 158
‐5
Plan Review Completed Within 30 days of 8 plans 4 plans
plans 95% 99%
Submission 100% 100%
Field Inspection Response within 48 hours of
100% 100% ‐ 100% 100%
Request
Major Goals Completed in the Past Two Months
Water main installation began for the proposed Dover Anchor Library.
OPERATIONAL SUMMARY
Task FEBRUARY 11 FEBRUARY 10 Current FY
Water Production – Daily Average 3,913,429 3,801,143 1,150,219,000
Average Field Response Time (goal is < 30 minutes) 19.4 25.1 20.5
Water Mains Repaired 3 1 20
Water Service Lines Repaired 3 ‐ 15
Wastewater Mains Repaired 2 2 8
Wastewater Service Lines Repaired 1 ‐ 7
Sewer Lines Flushed – Linear Feet 46,846 81,023 566,154
Percentage of Flow Sent to Kent County vs. Gallons Billed
99% 150% 90%
(inflow/Infiltration monitoring)
Total Water Meters in City Distribution System 13,897 13,772 69
Lost Time Accidents – All Water/Wastewater Divisions ‐ ‐ 2
18 City Manager’s Monthly Report, February 2011
Page 153
CITY PLANNER’S
MONTHLY REPORT
Public Services Group
P.O. Box 475
Dover, DE 19903
Phone: (302) 736-7010 Fax (302) 736-4217
February 2011
EDEN HILL FARM TND
For the Residential District of Eden Hill Farm Traditional Neighborhood Design a total of 42 dwelling
units are complete of the 51 permits approved for dwelling units. Two new permits for duplex were filed
in February for review and are expected to be issued in early March. Construction activity is ongoing on
a series of seven townhouse units on South Greenberry Lane and two duplex units on Ruth Way in
anticipation of final inspections occurring in March.
Compliance issues remain with project developer Hill Farm Associates in regards to timely payment to
allow for installation of street lighting in the Residential District.
The applicant requested Planning Commission review the Pattern Book guidelines after disagreeing with
Planning Staff’s interpretation on sideyard setbacks. At their February meeting, the Planning
Commission took action to interpret the Pattern Book guidelines pertaining to Townhouse Setbacks in
Phase 2 of the Residential District. (MI-10-20)
In February, there was no specific activity associated with the Professional Office, Medical & Financial
District.
For the Neighborhood Commercial District, no plan submissions (Check Prints) have been received
since the Planning Commission’s action on the Revised Implementation Plan (Revision #2-Updated Plan
of October 1, 2010) in October. The applicant is looking at potential relocation of the rights-in only
entrance from North Street.
COMPREHENSIVE PLAN IMPLEMENTATION
Planning Staff continues to focus efforts on the implementation items identified in the 2008 Comprehensive
Plan as amended.
The First Reading of the draft text amendments relating to solar and wind energy systems occurred on
February 14th with the Planning Commission review and hearing scheduled for March (MI-11-02).
Staff continues to work on a draft text amendment for the application processing provisions of Zoning
Ordinance, Article 10.
A set of Comprehensive Plan Amendments for 2011 (MI-11-01) was reviewed by the Planning
Commission in February. The proposed amendments focus on items related to the creation and adoption
of the Recreational and Open Space Zone (ROS) with an update to Table 12-1: Land Use and Zoning
Matrix and selected revisions to Map 12-1: Land Development Plan. Also one applicant initiated
amendments to the Land Development Plan map was considered. The Planning Commission’s
recommendations were forwarded to City Council for final action in March. Review of one applicant
initiated amendment was postponed until March.
Other Activities
New Dover High School Project (C-10-05) - Planning Staff continues to be involved in the various planning
discussions and review activities related to the new Dover High School project proposed to be constructed
Forrest Avenue (Route 8). February meetings included such topics as the anticipated project schedule with
associated plan submissions; coordination meeting with school district and adjacent developer; and the
landscape plan design. The Safety Advisory and Transportation Committee considered a Land Subdivision
Page 154
Regulations Waiver (Street Right-of-way width) for the project at their February 23rd meeting; however, the
waiver request has since been withdrawn by the applicant.
PERMITTING AND LICENSING REVIEW
The Planning Staff is part of the Building Permit review process. Our activities involving reviewing specific
types of permit applications for compliance with the Zoning Ordinance and for compliance with any conditions
of approval from the Planning Commission, Board of Adjustment, or Historic District Commission.
Permits Reviewed January-11 February-11 Permits Permits
(Issued) Reviewed Reviewed
YTD YTD
2010 2011
Building 12 13 31 25
Additions/Renovations
Permits
Building Permits 2 3 22 5
Demolition Permits 3 6 8 9
Fence Permits 5 2 4 7
Sign Permits 9 4 22 13
Temporary Sign Permits 2 6 10 8
Swimming Pool Permits 0 0 0 0
Certificate of Occupancy 11 9 12 20
Total # Permits 44 43 109 87
Reviewed (Issued)
CODE ENFORCEMENT
Case Type # cases # cases % staff % staff
current month YTD initiated initiated YTD
current month
No valid rental permit 3 4 67% 75%
No valid building permit 3 7 100% 86%
Tall grass and weeds 0 0 0% 0%
Unregistered vehicle 3 3 67% 67%
Abandoned vehicle 6 10 50% 50%
Annual Housing 80 109 95% 98%
Inspection
Property Maintenance – 25 43 36% 49%
Exterior
Electric Termination 15 15 100% 100%
Dover Code of 57 104 63% 56%
Ordinances
Zoning 9 18 56% 72%
Total Cases 201 313
Total # of Inspections 379
Page 155
On February 18, 2011, the Code Enforcement Division and Fire Marshal’s Office conducted joint re-inspections
of five House of Pride properties and found that all life safety violations had been adequately corrected and
nearly all other interior violations had been corrected. House of Pride was given until April 2011 to complete all
required exterior corrections, to allow for the weather to cooperate with the necessary repairs. Additional
inspections were performed on February 23, 2011, where it was determined that several items needed additional
correction. Follow-up inspections for the remaining two properties were scheduled for March 4, 2011.
COMMUNITY DEVELOPMENT
FISCAL YEAR 09-10 CDBG PROJECTS
U
Homeowner Rehabilitation Program FY09
Four (4) homes are underway: 814 River Road, 40 Bertrand Drive, 508 Walker Road (complete) and 106 Gordon
Place.
CDBG FY10 PROJECTS
Habitat for Humanity
The property at 101 Jefferson Court purchased by Habitat for Humanity has been fully renovated and sold to a low
income family on February 23rd.
First State Resource Conservation & Redevelopment Council (RC &D)
Emergency repairs have been completed on 14 homes in the City of Dover.
Homeownership Assistance Program
Two clients have purchased properties in the City of Dover.
Connections Community Support Program
Twenty-three homeless individuals received motel vouchers for temporary housing year to date.
Neighborhood Stabilization Program (NSP)
The City was awarded $1,426,740 for the acquisition and rehab of foreclosed properties to be sold to qualifying
families. A total of $1,249,467 has been expended on the acquisition and renovations for 8 properties. The
remaining balance of $177,272 will be utilized for renovations and acquisition. Three properties have been sold,
three are for sale, one is a lease purchase and one is a rental that serves persons with disabilities. Dover Housing
Authority purchased 1415 S. Hancock Avenue with program income. The following list the status of each NSP
property:
218 Ann Avenue (sold) 337 N. Governors Avenue (for sale)
343 Mimosa Avenue (sold) 254 Green Blade Drive (sold)
907 Woodcrest Avenue (lease purchase) 302 Stonebrook Place (for sale)
1430 S. Hancock (group home) 11 Westover Drive (for sale)
1415 S. Hancock (new home purchase)
MEETING REPORTS
Board of Adjustment:
The Board of Adjustment met on February 16, 2011 and took the following action. The next regular scheduled
meeting of the Board of Adjustment is scheduled for March 16, 2011.
1. Applicant #V-11-01;-104 Saulsbury Road, Dover ED, LLC – Moved to approve sign variance.
Page 156
Historic District Commission:
The Historic District Commission met for the regular meeting on February 17, 2011 and took the following
action. The next regular Historic District Commission meeting is scheduled for March 17, 2011.
1. HI-11-01 Building at 326 West Loockerman Street: Building Demolition – Moved to approve
Architectural Review Certification for Demolition with the provision that there be some sort of low
fencelike barrier along the perimeter of the property around the building and other areas determined by
the owner and subject to the approval of DNREC. The building would not be subject to any additional
recordation and Demolition is approved with the understanding that the depressed areas of the
foundation would be brought up to grade.
Planning Commission
The Planning Commission met on February 22, 2011 (due to holiday on Monday) and took the actions
summarized listed below. The next scheduled Planning Commission meeting is scheduled for March 21, 2011.
1. MI-11-01 Comprehensive Plan Amendments 2011 - Moved to forward to City Council a
recommendation of approval to adopt the Land Use and Zoning Matrix Table 12-1 and the changes
associated with it. And to recommend adoption of the Land Development Plan map that depicts the
Land Use changes (Items #1-16) and that we make a recommendation to change the Land Use
classification for DoveView Apartments (Item #17) to High Density Residential. This action excluded
Items #18 through #21 on the Land Development Plan Map changes which will be considered at a future
meeting.
2. Z-11-03 DoveView Apartments at 101-405 DoveView Drive – Moved to forward to City Council a
recommendation of approval of rezoning the property from I/O (Institutional and Office zone) and
subject to the Corridor Overlay Zone (COZ-1) to RG-5 (General Residence Zone for mid-rise
apartments) and subject to the Corridor Overlay Zone (COZ-1), and for reasons stated in the Staff
Report and general discussion at the meeting.
3. S-11-02 C.F. Schwartz Building Addition at 1530-1536 North DuPont Highway – Moved to approve
the Site Plan for a building addition with denial of the request for the sidewalk waiver; granting the
waiver for the elimination of the arterial street buffer; approval of the tree planting mitigation plan; and
approval waiver to allow the partial elimination of curbing. The applicant is to work with Staff to come
up with some façade changes on the south facing side of the building to help break up that appearance.
4. S-11-03 Courthouse Parking Lot on West Water Street – Moved to approve the Conditional Use Site
Plan and to include the Architectural Review Certificate HI-10-11 for the parking lot project. Also
includes approval of the waiver request for partial elimination of curbing and elimination of the opaque
barrier fence component. The approval consists of the Conditional Use for the west parking lot and the
Site Plan review of the entire parking lot construction project.
5. MI-11-04 Treadway Towers Parking Waiver Request – Moved to approve the use of the “Combined
Spaces” provisions of the Zoning Ordinance and set the required parking at 123 spaces.
6. MI-10-20 Eden Hill Farm TND: Phase 2 Revisions – Consideration of Pattern Book Interpretation
– Moved to approve the use of the five (5) foot side yard setback between townhouse building groupings
for the three (3) separate building groupings that comprise the block for this particular area of Phase 2 as
this would be more aesthetically pleasing making everything balanced.
Submitted by:
Ann Marie Townshend, AICP
Planning & Community Development Director
Page 158
Date Range: From 02/ 01/ 2011 to 02/ 28/ 2011
Incidents by Situation Found
Dover Fire Department
Situation Found
11 Fire
Hazardous Condition (No F 0 Overpressure Rupture, Exp
5 Rescue & Emergency Medica
9 Hazardous Condition (No F
Rescue & Emergency Medica
16 Service Call
Overpressure Rupture, Exp 9 Good Intent Call
34 False Alarm & False Call
Service Call 0 Severe Weather & Natural
0 Special Incident Type
0 Blank
Fire
Severe Weather & Natural
Special Incident Type
Blank
Good Intent Call
False Alarm & False Call
Date: 03/29/2011 Page: 1
Page 159
Date Range: From 02/ 01/ 2011 to 02/ 28/ 2011
Manpower Hours by Sitation Found
Dover Fire Department
Num ber of Hours by Situation Found
Sum of # Attending X Incident Length
261 Fire
0 Overpressure Rupture, Exp
Overpressure Rupture, Exp Fire 31 Rescue & Emergency Medica
Rescue & Emergency Medica 119 Hazardous Condition (No F
168 Service Call
51 Good Intent Call
144 False Alarm & False Call
0 Severe Weather & Natural
0 Special Incident Type
Hazardous Condition (No F
Severe Weather & Natural
Special Incident Type
False Alarm & False Call
Service Call
Good Intent Call
Date: 03/29/2011 Page: 1
Page 160
Date Range: From 01/ 01/ 2011 to 02/ 28/ 2011
Alarms by Month of Year
Dover Fire Department
90 84
85
80
72
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5 0 0 0 0 0 0 0 0 0 0
0
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Date: 03/29/2011 Page: 1
Page 161
Date Range: From 02/01/2011 to 02/28/2011
Incident Run Log Company: All Companies
Dover Fire Department Sorted by: Not selected
Date FDID Incident# Alarm ### Address Suite Type
02/01/2011 30046 2011-000073 08:40 NAULT RD Extrication of victim(s) from vehicle
The Dover Fire Department responded to an MVC with entrapment in the area of Nault Rd and Hazellvillle Rd. On arrival, E4 officer (Fortney)
reported a single vehicle crash with a vehicle on it's side. E4's crew stabalized the vehicle and then began extrication on the vehicle.
Rescue 1 and E2 arrived on scene and assisted E4's crew. The subject inside the vehicle was an elderly female who was not injured but
was unable to remove herself from the vehicle. The front windshield and the roof were removed which gave the occupant the space
needed to exit the vehicle. A63 were on scene but the patient refused any medical treatment. DFD units cleared and no further action
taken. The scene was subsequently turned over to DSP.
02/01/2011 30046 2011-000074 08:47 800 ROSE VALLEY SCHOOL RD Extrication, rescue, other
The Dover Fire Department repsonded to the area of the 800 Blk of Rose Valley School Rd in reference to an MVC with entrapment. E2
arrived and located a single vehicle crash with the vehicle on it's side. E2 officer (Small) reported that there was no entrapment and the
occupants were not injured. No further action was taken by DFD personnel.
02/01/2011 30046 2011-000075 17:11 BAY RD Passenger vehicle fire
On arrival found a bystander attempting to extinguish a small fire under the hood of a 2002 Grand Cherokee. Crew investigated same and
used a booster line to finish extinguishing the fire. The battery was secured to the vehicle and the vehicle was off the roadway. The
occupants were standing by with the vehicle until the owner arrived. Units cleared.
02/03/2011 30046 2011-000076 00:54 801 N DUPONT HWY Sprinkler activation, no fire - unintentional
On arrival E3 made contact with on-site supervisor who stated that overnight inventory workers where moving stock from high shelves and
inadvertently damaged a sprinkler head causing the alarm system to activate. Water to the system was shut off prior to our arrival. E3
completed a walk thru and the scene was then turned over to the on-site manager.
02/03/2011 30046 2011-000077 12:10 911 S DUPONT HWY 1 Alarm system activation, no fire - unintentional
Writer responded to above for report of the alarm being activated and the maintenance on scene failed to notify the fire department or alarm
company of same. Writer arrived and found crews working on the detectors in the Delaware Hospice office. Scene was placed under
control and turned over to FM-2 for further.
02/03/2011 30046 2011-000078 12:23 744 RIVER RD False alarm or false call, other
Writer responded to above for an automatic fire alarm activation and dispatched received a reset within seconds from the alarm company.
Writer arrived and found Comcast crews working on the phone system which activated the alarm systems. Writer contacted the daycare
manager and advised her of proper procedures when working on systems. Scene was turned over FM-2 for further.
02/03/2011 30046 2011-000079 20:04 NEW BURTON RD & WYOMING AVE Service Call, other
Dover Fire Department responded to the above address in reference to a vehicle crash involving a train. E4 stood by while the tow
company removed the vehicle, then cleared. No further action taken.
02/03/2011 30046 2011-000080 22:13 1200 N DUPONT HWY System malfunction, other
Dispatched to a AFA on arriaval E-3 crew performed a walk thur with DSU police, all floors where cleared. Scene turned over to DSU PD.
02/04/2011 30046 2011-000081 02:34 287 GREEN BLADE DR Electrical wiring/equipment problem, other
E4 responded to the above location for report of a possible electrical fire. E4 arrived on location and the crews entered the structure to
investigate. After investigating crews were unable to locate the source of the problem however secured the power to both bedrooms as a
safety precaution. The resident Laura White was advised to contact an electric worker in reference to her problem. Units cleared .
02/04/2011 30046 2011-000082 11:01 15 EDGEWOOD RD Arcing, shorted electrical equipment
DFD was disaptched to the above address for a burning odor in the residence. On arrival found an electric hot water heater had shorted
out causing an odor of smoke inside. Crews secured the electric and the residence was turned over to the owner. All units cleared.
02/04/2011 30046 2011-000083 14:56 400 COURT ST Gas leak (natural gas or LPG)
DFD was dispatched to a natural gas in the area of 400 Court Street. On arrival crews checked the area and found a valve ox in the ground
was leaking Natural Gas. Chesapeake was notified and responded. Scene turned over to Chesapeake Utilities. FD cleared.
02/04/2011 30046 2011-000084 15:58 127 S ceasar rodney ave Cover assignment, standby, moveup
The Dover Fire Department responded to the above address in reference to a truck company assist. On arrival, L2 positioned and E4 laid a
5" supply line to same. E3 arrived and assisted 41's crews with fire supression. The handlines quickly supressed the fire and Command 41
advised that the truck would not be used. Crews placed L2 and E4 back in service and E3's crew was released by 41 Command. No
further action taken by DFD personnel.
02/04/2011 30046 2011-000085 21:04 820 SILVER LAKE BLVD Smoke detector activation, no fire - unintentional
Crew from E3 investigated to find the cleaning crew had knocked the pull station off the wall. Bldg was placed on fire watch.
02/04/2011 30046 2011-000086 21:31 855 TOWNSEND BLVD Cooking fire, confined to container
Crew from E3 investigated to find unattended cooking requested positive pressure front.
02/05/2011 30046 2011-000087 08:37 400 E WATER ST Gasoline or other flammable liquid spill
Dispatched for an odor investigation. Unit's arrived on scene and found a blue pick-up truck that had an odor of gas gasoline around the
vehicle. Around the block at the Family Court building, there was also a small odor of natural gas at a main shut-off valve (similar leak at that
location yesterday). Chesapeake Utilities was notified. All units returned to quarters.
02/05/2011 30046 2011-000088 12:10 8 SAXTON RD Good intent call, other
On arrival found a odor of Drano that was mistaken for a Natural gas leak by one of the occupants at the above location. No further action
taken by FD.
02/05/2011 30046 2011-000089 22:32 255 WEBBS LA E Cooking fire, confined to container
The Dover FIre Department responded to 255 Webbs Lane, building E in reference to smoke inside the apartments. On arrival, E4's crew
Date: 03/29/2011 Page: 1 Time:15:18
Page 162
Date FDID Incident# Alarm ### Address Suite Type
located unattended cooking on the thrid floor. A positive pressure fan was placed at the front door to remove the smoke from the hallways.
No further action taken. City Fire Marshal's officer was made aware of the incident.
02/06/2011 30046 2011-000090 01:21 171 WESTMINSTER DR System malfunction, other
E-3 crew made access to attic area. Sprinkler pipe in attic area leaking from a previous repair, leaking water thru ceiling tile to div 3.
02/06/2011 30046 2011-000091 10:28 500 PERSIMMON TREE LA 5 Smoke detector activation due to malfunction
DFD responded to 500 Persimmon Tree Apts for an AFA. On arrival crews found activated smoke detector in the 2nd floor hallway for no
apparent reason. Bldg turned over to maintenance, all units cleared.
02/06/2011 30046 2011-000092 16:59 3164 WALNUT SHADE RD Cover assignment, standby, moveup
The Dover Fire Department was dispatched to the above address in reference to a truck company assist. Command 41 canceled all units
prior to arrival. Units returned, no action taken.
02/07/2011 30046 2011-000093 00:53 110 HAMAN DR 304 Cooking fire, confined to container
The Dover Fire Department responded to the above address in reference to an alarm activation. On arrival, E4's crew located burnt popcorn
in apartment 304 that caused the alarm to activate. No further action taken. Building maintenance was on scene.
02/07/2011 30046 2011-000094 02:36 488 COUNTRY DR J Electrical wiring/equipment problem, other
Electrical outlet arcing in bedroom. E-4 crew isolated electrical power to outlet. no extension.
02/08/2011 30046 2011-000095 09:58 1575 MCKEE RD 102 False alarm or false call, other
The Dover FIre Department responded to the above address in reference to an alarm received from Advantech. On arrival, E3's crew were
met by building personnel that stated they were testing the alarm system. Investigation revealed that the h-vac was being tested which
caused a light spark that activated the fire alarm system. No other action taken.
02/08/2011 30046 2011-000096 12:39 406 FEDERAL ST False alarm or false call, other
Dover Fire Department responded to the above address in reference to an alarm received fro Delaware Electric Signal. Units checked the
building but met with negative results. No further action taken.
02/08/2011 30046 2011-000097 18:12 51 WEBBS LA E Cooking fire, confined to container
The Dover Fire Department responded to the above address in reference to smoke in the hallways. On arrival, E4's crew located
unattended cooking in one of the apartments. No damage and no mecchaical ventilation needed. No action taken.
02/09/2011 30046 2011-000098 02:39 455 NEW CASTLE AVE Building fire
The Dover Fire Department was dispatched to the above address in reference to a working house fire. E4 (Fortney) arrived on scene and
observed heavy smoke showing from the residence. E4 established their own water supply and placed a 200' preconnect line into service
through the front door, for fire supression. Ladder 2 arrived and conducted a primary search of the residence and also placed a second
preconnect handline into service to assist with fire supression. 54-5 arrived on scene and was placed at the rear of E4 as the RIT. E3's
crew was directed to assist with the search of the residence. Engine 41-3's crew conducted a search of both exposures, 453 and 459
New Castle Ave to check for extension but met with negative results. The interior crews encountered heavy fire on the first floor and also
had a large volume of fire above, in the attic area. As the interior crews were attempting to pull the ceiling in order to get to the fire in the
attic, fire vented through the roof and the roof began to sag and conditions deteriorated. At 0254 hours, Command (Fortney) contacted
Dover communications and ordered the evacuation tones be broadcasted. Once the crews exited the structure, Ladder 2 was placed in
service. Ladder 2 flowed water for approximately 5 minutes and knocked the fire down in the attic. Ladder 2 was then ordered to stop
flowing water and after this, crews re-entered the structure and placed handlines back in service for the remaining hot spots. At 0313 hrs,
Command placed the incident under control but held all units on for extensive overhaul. At 0427 hrs, the last unit cleared the scene and the
scene was subsequently turned over to the City of Dover Fire Marshal's office.
In addition to the above mentioned units, Chesapeake Utilities and the City Electric were notified to respond to the scene.
02/10/2011 30046 2011-000099 20:42 439 Arnold Ct. Good intent call, other
Found a hot receptacle in the wall, opened wall with negative results. Power was secured to outlet and room. Tenant was advised to
contact landlord.
02/10/2011 30046 2011-000100 21:12 1253 COLLEGE PARK DR Good intent call, other
E3 responded to the above address in reference to an unknown odor. The crew from E3 invesigated same and met with negative results.
No further action taken.
02/11/2011 30046 2011-000101 02:42 ALDER ROAD Smoke or odor removal
Dover Fire was dispatched to the area of Alder Rd in reference to an odor of smoke in the area. While responding to the station, writer (15)
noticed that Dover pd had several units in the area and had negative findings. Writer confirmed with Dover PD that there was nothing in the
area and then cancelled the response.
02/11/2011 30046 2011-000102 11:39 151 KINGS HWY False alarm or false call, other
E4 responded to the above address in refence to an alarm sounding. The building was checked but met with negative results.
02/11/2011 30046 2011-000103 11:58 7 KENTWOOD DR Fire in mobile home used as fixed residence
Dispatched to a reported mobile home fire. Upon arrival found an occupied 14 x 70 house/trailer with smoke showing from the roof area. A
kitchen fire was found by the engine crew after making forcible entry. Crews extinguished the fire which was contained to the kitchen as
well as ventilated the structure and preformed a primary search with negative results. Red Cross was notified for one 60 year old legally
blind male that needed assistance and housing.
02/11/2011 30046 2011-000104 19:13 200 E CAMDEN WYOMING AVE Cover assignment, standby, moveup
02/12/2011 30046 2011-000105 02:50 COLUMBIA AVE Extrication of victim(s) from vehicle
The Dover Fire Department was dispatched to North State St and Columbia Ave in reference to an MVC with entrapment. While enroute,
A63 advised there was no entrapment. E4 arrived on scene and confirmed no need for the fire department. No action taken.
02/12/2011 30046 2011-000106 11:24 1545 Pearsons Corner Rd Cover assignment, standby, moveup
The Dover Fire Department was dispatched to the above address in reference a RIT assist. E4 arrived on location and staged at the rear of
Command 51. After several minutes, Command 51 released DFD personnel. No action taken.
02/12/2011 30046 2011-000107 18:09 909 N DUPONT HWY Smoke detector activation due to malfunction
Date: 03/29/2011 Page: 2 Time:15:18
Page 163
Date FDID Incident# Alarm ### Address Suite Type
Dover 15 responded to the above address in reference to an alarm activation at that location. On arrival, writer contacted the manager who
advised he was unaware that the alarm had been activated. The manager stated there was no problem and business was normal. He was
advised to contact his alarm company and maintenance to check the alarm system. No further action taken.
02/13/2011 30046 2011-000108 13:28 2012 Forrest Ave Extrication of victim(s) from vehicle
At approx 1:28 PM Dover Fire was dispatched for a manpower assist for an MVC at 2212 Forest Ave. E-2 arrived on location to find a two
car collision between a van and a pickup with impingement on the drivers door with one patient unable to be removed from the vehicle
because of their size and a pre-existing medical condition. A63 and DSP where on location prior to our arrival. After an scene size up E-2
crew hooked up E-2's winch to pull the van off the pickup. E-3 crew arrived on scene and cribbed the vehicles. It was determined that the
passenger side door would have to be removed to extricate the patient using the hydraulic cutter and spreaders. Once the doors where
removed the patient was extricated and transported to KGH by A-63. Once all units retrieved their equipment the scene was turned over to
DSP. On scene E2, E3, A63, DSP.
02/13/2011 30046 2011-000109 17:41 311 MAIN ST Cover assignment, standby, moveup
The Dover Fire Department assisted Little Creek with a marsh fire.
02/14/2011 30046 2011-000110 13:47 1057 S GOVERNORS AVE False alarm or false call, other
On the above date and time dispatch alerted Dover Fire for an automatic alarm at the above location. Upon responding dispatch advised
Writer that the alarm company was contacted by the respondant stating the alarm system was missing a key on the keypad and it was a
malfunction. Writer made the decision to hold all apparatus in station and make the response himself. Upon arrival Writer contacted Deacon
Pruitt who advised the same problem. Writer placed the building on Firewatch until the business fixes the alarm system and panel.
02/14/2011 30046 2011-000111 15:19 110 FIREHOUSE LA Cover assignment, standby, moveup
E3 covered station 56 for a woods fire.
02/14/2011 30046 2011-000112 23:40 348 N DUPONT HWY Building fire
The Dover FIre Department responded to the Super 8 in reference to a building fire. On arrival, located a small fire on the roof area. One
preconnect line was placed into service and quickly extinguished the fire. Station 54 and 43 were recalled. L2 arrived and the main was
placed to the roof area for lighting. E3 laid a 5" supply line to E4 but was not utilized. E2 and E6 arrived and staged. The scene was placed
under control and turned over to City FM4.
02/15/2011 30046 2011-000113 03:00 655 N DUPONT HWY False alarm or false call, other
E3 and E4 responded for an automatic alarm. While units were respondiing dispatch advised units that rp was reporting a fire at the rear of
the structure. E3 went on location and advised they could handle the mulch fire that was at the rear of the building . Fire was extinguished
and units cleared.
02/16/2011 30046 2011-000114 04:59 108 KATRINA WAY System malfunction, other
The Dover Fire Department responded to the above address in reference to an alarm activation. Units checked the location and met with
negative results.
02/16/2011 30046 2011-000115 08:41 801 OTIS DR Unintentional transmission of alarm, other
Dispatched to above location for an AFA. Prior to going en route, DES contacted this department and related there were workers on sight
changing smoke detectors. No units sent, follow up to be performed by City FMO
02/16/2011 30046 2011-000116 15:09 121 S STATE ST Smoke or odor removal
The Dover FIre Department responded to the 100 Block of South State St in reference to a pickup truck smoking. On arrival, contacted the
owner who advised the dashboard had light smoke coming from same while the vehicle was running. The owner was advised to have the
vehicle towed but he inturn, decided to drive the vehicle to his residence on Pearson's Corner Road. No action taken by DFD personnel.
02/16/2011 30046 2011-000117 18:03 230 GREEN BLADE DR Electrical wiring/equipment problem, other
Dispatched for an electrical odor investigation to the address above. Upon arrival, crews were led to the basement by the home owner.
Investigation revealed a battery charger (hand held tool) that had been plugged in for an extended period of time and had gotten very warm.
The couch had been pushed against the transformer not allowing for any air circulation. The homeowner was advised to unplug the device
and move it to a different location the next charge cycle.
02/16/2011 30046 2011-000118 21:50 640 LAFFERTY LANE Gas leak (natural gas or LPG)
On arrival found a propane tank leaking from the bleeder valve on top of the tank. Crew hand tighen same and the leak stopped. Crews
cleared.
02/17/2011 30046 2011-000119 06:24 600 JEFFERIC BLVD False alarm or false call, other
Fire Alarm was reset prior to our arrival. Unfounded why fire alarms was activated. After walk thought units cleared.
02/17/2011 30046 2011-000120 11:39 1045 N DUPONT HWY Unintentional transmission of alarm, other
The Dover Fire Department was dispatched to the above address in reference to an alarm sounding. After dispatch, investigation revealed
that maintenance was on scene and working on the duct detectors and unintentionally activated the alarm system. E4 made the response
and confirmed same. No further action taken.
02/18/2011 30046 2011-000121 08:12 1478 WYOMING MILL RD Alarm system activation, no fire - unintentional
On arrival found a trouble alarm due to a power outage in the area. Crews checked the building and cleared.
02/18/2011 30046 2011-000122 09:09 1624 N LITTLE CREEK RD Smoke detector activation, no fire - unintentional
On arrival minatenance personnel were installing a new heater. When the heater was started for the first time smoke from the paint burning
off the new heater was discharged into the building causing the detecter to activate. FD cleared.
02/18/2011 30046 2011-000123 10:52 1041 N DUPONT HWY False alarm or false call, other
Alarm company on scene working on the system upon arrival. Alarm company never reported the test to this agency
02/18/2011 30046 2011-000124 14:25 243 ROUNDTREE DR Good intent call, other
DETECTOR OVER THE OVEN WAS BROKEN. 16 MONITORED THE AIR WITH 54-8 CREW WITH NO READINGS
02/18/2011 30046 2011-000125 17:00 1178 PROCTOR PURCHASE Cover assignment, standby, moveup
Dispatched for RIT assist. Under control while en route-Returned. No action taken
02/19/2011 30046 2011-000126 11:25 FOX RD Forest, woods or wildland fire
Date: 03/29/2011 Page: 3 Time:15:18
Page 164
Date FDID Incident# Alarm ### Address Suite Type
The Dover Fire Department arrived on scene of a woods fire on Fox Rd s/o Rt on the west side of the roadway. E54-5 arrived and placed a
booster line in service. The fire quickly spread with the high winds and 54-0 arrived and was placed into service. Command (15) requested
two additional engines to the scene for water supply and Brush 9 also arrived and was placed into service. The woods fire was contained
to an area of 100 X 150 yards. The crews remained on scene to secure the remaining hot spots. After approximately 1 1/2 hours on
scene, crews secured their equipment and returned to Headquarters.
02/19/2011 30046 2011-000127 12:39 429 S GOVERNORS AVE 1 Smoke or odor removal
The Dover FIre Department responded to the above address in reference to a possible building fire. E7 arrived on scene and located a small
mulch fire at the rear of the building that had been extinguished prior to DFD personnel arriving. Unists checked for extension and met with
negative results. No further action taken.
02/19/2011 30046 2011-000128 13:46 S DUPONT HWY Extrication of victim(s) from vehicle
Units from DFD and Little Creek responded to Rt 13 and Loockerman St in reference to an MVC with entrapment. Dover 15 arrived on scene
and noticed there was no one trapped and no need for fire service. All units were recalled prior to their arrival. No action taken.
02/19/2011 30046 2011-000129 18:16 N. LITTLE CREEK ROAD Service Call, other
E7 responded to North Little Creek Rd w/o Fox Rd in reference to hot spots at the location that was previously used for a controlled burn.
E7 soaked the area with 1000 gallons of water. No other action taken.
02/20/2011 30046 2011-000130 03:10 1200 N DUPONT HWY Malicious, mischievous false call, other
Pull station activation bldg two apt 212. Crews investigated to find malicious pull at Apt. 212. Placed scene under control and turned over to
University police.
02/20/2011 30046 2011-000131 11:16 310 BILLY MITCHELL LA F Detector activation, no fire - unintentional
Units responded for report of an automatic alarm. E4 arrived on location first and 22 took command. Upon investigating the apartment 301 it
was learned that the detector was hit by a moving crew. Maintenance arrived on scene and the scene was turned over to them for further.
Units cleared .
02/20/2011 30046 2011-000132 13:24 110 FIREHOUSE LA Cover assignment, standby, moveup
Dispatched Sta 2 crew call for cover-up assignment Sta 56. Three personnel responded to Sta 2. Four Personnel showed at Sta 1. 21
decided to respond with a full crew on E-6. Stood by at sta 56 until moved up to fire scene to help with manpower to mop up. Release by
command and returned to Sta 1.
02/20/2011 30046 2011-000133 20:14 255 WEBBS LA H Cooking fire, confined to container
The Dover FIre Department responded to 255 Webbs Lane building H in reference to an odor of smoke in the third floor apartment. E4, L2
and E3 arrived on location and entered the building to investigate. Crews located unattended cooking on the ground floor apartment (11).
Positive pressure was placed into service at the front door and displaced the smoke in the building. After this, the scene was turned over
to building maintenance. No further action taken. No damage.
02/21/2011 30046 2011-000134 12:18 800 OTIS DR Detector activation, no fire - unintentional
Dispatched to 801 Otis Dr for a AFA General nature. Upon arrival no alarm activation. Verified Address with dispatch, notified bldg may be
marked as 800. Occupant came out of 800 and stated their alarm had activated. Bldg was checked by E-4 crew, no activation noted. While
command was getting occupancy info, an employee had stated she had enter the CODE and reset the panel to silence the horns. Advised
them of proper procedures and to notify alarm company of proper address, Mr Fithian stated he had notified them before and all the alarm
company would do is make a note on the record that the bldg MAY BE Marked as 800.
02/21/2011 30046 2011-000135 17:58 3000 LEMAY LA C False alarm or false call, other
The Dover FIre Department responded to the above address in reference to an alarm activation. On arrival, E4's crew located a pull station
that was accidentally activated by a resident. No further action taken.
02/22/2011 30046 2011-000136 12:46 911 S DUPONT HWY Unintentional transmission of alarm, other
The Dover Fire Department was dispatched to the above address in reference to an alarm activation. While enroute, Dover communication
advised there was construction work being conducted which activated the alarm system. Dover 15 cancelled the response and inturn,
contacted the City of Dover Fire Marshal's office to make a response. FM-1 responded and made contact with the employees at that
location.
02/23/2011 30046 2011-000137 11:03 426 S NEW ST Sprinkler activation, no fire - unintentional
WORKERS DRILLED A HOLE IN A SPRINKLER PIPE ACCIDENTLY CAUSING A WATERFLOW.
02/23/2011 30046 2011-000138 14:28 528 SCHOONER WAY Heat from short circuit (wiring), defective/worn
Dover Fire was alerted for report of a dryer fire at the above residence. E4 responded under the direction of 22. E4 arrived on location and
22 assumed command of the incident. Upon investigating crews found that sparks from the dryer vent hose caused the lint to catch fire. A
light smoke condition was found inside however the homeowner did not wish positive pressure venilation. Power was secured to the dryer
and the homeowner was advised not to restore power until the dryer unit and electrical outlet were both inspected. 22 placed the scene
under control once this was done.
02/23/2011 30046 2011-000139 21:59 36 Nixon ln Good intent call, other
Units were alerted for report of smoke in the area of Nixon Ln and N. Little Creek Rd. E4 responded and investigated the area of Nixon Ln. E3
investigated the area of Manchester Square. E4 found light and normal smoke coming from a chimney at 36 Nixon Ln. E3 found nothing in
their area . Scene was placed under control and all units returned.
02/24/2011 30046 2011-000140 10:42 300 S NEW ST Alarm system sounded due to malfunction
Writer responded due to alarm company attempting to cancel the alarm for unk reasons. Writer arrived on scene and contacted the security
officer at the location. He advised that the maintenance crew hit a detector on the roof while they were working on same. Alarm was reset
prior to Fire Department arrival.
02/24/2011 30046 2011-000141 19:20 1300 S FARMVIEW DR D Good intent call, other
The Dover FIre Department responded to the above address in reference to an alarm activation. On arrival, E4's crew located unattended
cooking which caused the alarm to activate. No damage, no further action taken.
Date: 03/29/2011 Page: 4 Time:15:18
Page 165
Date FDID Incident# Alarm ### Address Suite Type
02/24/2011 30046 2011-000142 20:44 148 WILLIS RD Good intent call, other
The Dover Fire Department responded to the above address in reference to odor of gas in the residence. On arrival, E4's crew determined
that the odor was possibly coming from a puppy pad that the resident was using for the pet. The appliances in the apartment were all
electric. No further action taken.
02/24/2011 30046 2011-000143 21:07 1760 N DUPONT HWY Smoke or odor removal
The Dover Fire Department responded to 1706 N Dupont Hwy in reference to a smoke invesitgation. On arrival, crews were directed to the
kitchen area by employees at the hotel. Investigation resulted in negative findings. No further action taken.
02/25/2011 30046 2011-000144 00:59 601 W FULTON ST Smoke or odor removal
The Dover Fire Department responded to 601 Fulton St in reference to an odor of smoke in the building. Crews from E4 and E3 investigated
the odor and deteremined the smell was coming from the heater. The employees were instructed to contact maintenance for possible
repairs to the system. No further action taken.
02/25/2011 30046 2011-000145 09:22 400 HASLET ST Alarm system activation, no fire - unintentional
Dispatched to an AFA at the above location. Upon arrival, was met by maintenance personnel on scene relating a malfunctioning system.
They relate that the system is showing pull station activations, however all are secure. The think water may have got into the alarm panel.
Had crews do a walk around of Bldg 100 A&B with negative results. FM2 arrived on scene and was advised of the situation. FM2 placed
the entire complex on "Fire Watch" until the system could be restored to normal. All units cleared, turning the scene over to FM2.
02/25/2011 30046 2011-000146 11:05 71 MER WAY Unintentional transmission of alarm, other
Dispatched to an AFA at the above location. Upon arrival, was met by the homeowner who relates the alarm sounded while she was
curling her hair in the bathroom and smoke from same set off the detector. The system had been reset prior to our arrival. Homeowner was
advised of proper procedures. Cleared the scene.
02/25/2011 30046 2011-000147 15:37 201 STOVER BLVD Arcing, shorted electrical equipment
Dispatched for an electrical odor at the above location. While en route, FM1 went on location and reported a light smoke haze on the ground
floor. Upon arrival, crews investigated an electrical odor an smoke condition coming from the electrical room. Crews reported an apparent
power surge causing circuit breakers to trip and some minor heat damage to the wiring. Diamond Electric crews were on scene. Power
was secured to the panel and the scene was turned over to FM1 and maintenance. Cleared the scene. While returning, FM1 advised Dover
that the City Elec. Dept was need priority 1 due to blowing power lines hitting the building and shorting and arching. No need for fire
apparatus.
02/25/2011 30046 2011-000148 15:38 1225 WALKER RD False alarm or false call, other
Dover FIre Department responded to the above address in reference to an alarm sounding. On arrival, crews conducted a walk through
and met with negative findings. No further action taken.
02/26/2011 30046 2011-000149 11:53 223 CHENNAULT CT Unintentional transmission of alarm, other
Dispatched to a fire alarm activation. Upon arrival found a end of the row townhouse, resident had activated the keypad while cleaning it.
02/26/2011 30046 2011-000150 20:58 30 CARVER RD Good intent call, other
POSSIBLE CARBON MONOXIDE INCIDENT. NO PROBLEM WAS FOUND.
02/27/2011 30046 2011-000151 17:26 416 COUNTRY DR System malfunction, other
The Dover Fire Department responded to the above address in reference to an alarm sounding. Crews conducted a walk through buildings
416 and 424. Crews were unable to locate a reason for the alarm activation. Ladder 2 officer (16) advised that the scene was under
control. No further action taken.
02/27/2011 30046 2011-000152 20:44 986 WHATCOAT DR False alarm or false call, other
Smoke detector activation. Investigation showed Title 16 under detector
02/28/2011 30046 2011-000153 00:27 216 N STATE ST Smoke or odor removal
Unattended cooking in multi family dwelling.
02/28/2011 30046 2011-000154 15:56 426 S NEW ST Smoke detector activation, no fire - unintentional
Smoke detector activation from cutting drywall. Alarm silenced.
02/28/2011 30046 2011-000155 19:07 1061 S LITTLE CREEK RD 67 Fire in mobile home used as fixed residence
On the above date and time , Dover Fire Dept. was alerted for report of a working trailer fire, believed to be abandoned. E4 responded under
the command of 22. Writer arrived on scene and reported light smoke showing and assumed command of the incident. E4's crew stretched
an 1 3/4 handline thru the front door. 54-5 arrived and set up the RIT operations as well as stood by the hydrant in the area of 71 W.
Roundtree Dr. Rescue 1 arrived on location and was staged at the rear of E-4. E-3 arrived and staged behind 54-5. Rescue 1's crew was
given the assignment of positive pressure to the front door as well as primary and secondary searches. E4's crew extinguished the fire
rapidly and the fire was contained to the front room. Engines 2,6, A63, and KM-7 staged at the entrance on W. Roundtree Dr. and held their
crews.
Primary and Secondary searches were negative of the residence and the scene was placed under control. Units remained on scene until
FM-2 and FM-1 arrived. The scene was turned over to the City of Dover Fire Marshall's office for further investigation.
02/28/2011 30046 2011-000156 21:29 413 COURT ST C Good intent call, other
Dispatch called writer and informed him that the alarm system was sounding in the area of G or F building at the above location however the
subject that had called 911 had disconnected and was unable to be recontacted. No exact area was given and the department was not
alerted by any monitoring company of same. Writer arrived on scene and was contacted by Colonial Investments Maintenance who stated
the resident of H 2 had unattended cooking approx 30 min prior to my arrival. Writer investigated same and that was confirmed by the
resident as well. Alarm had been reset prior to fire department arrival due to the fact that it had been going off for 30 min.
Total Incidents: 84
Page 166
FY 10-11 City Funded Account Balance Sheet
ACCOUNT BUDGET SPENT BALANCE
Apparatus Repairs & Maintenance $ 60,500.00 $ 52,574.36 $ 7,925.64
Gasoline $ 21,000.00 $ 9,782.66 $ 11,217.34
Medical Supplies $ 700.00 $ 700.00
Other Equipment Repairs $ 4,000.00 $ 714.00 $ 3,286.00
Program Expenses $ 34,630.00 $ 16,348.34 $ 18,281.66
Radio Repairs $ 2,000.00 $ 802.62 $ 1,197.38
Safety & Security $ 3,150.00 $ 506.76 $ 2,643.24
Small Tools $ 4,800.00 $ 2,544.95 $ 2,255.05
Uniforms & Firefighting Gear $ 26,100.00 $ 15,151.05 $ 10,948.95
Building Expenses- Electricity $ 53,820.00 $ 36,493.44 $ 17,326.56
Building Maintenance Supplies $ 1,950.00 $ 1,089.98 $ 860.02
Heating Expenses- Gas $ 20,000.00 $ 9,895.65 $ 10,104.35
Telephone $ 19,340.00 $ 10,621.36 $ 8,718.64
Water & Sewer $ 2,150.00 $ 2,406.36 $ (256.36)
Contractual Services $ 16,587.00 $ 16,587.00
Training & Travel $ 8,365.00 $ 5,601.00 $ 2,764.00
Pension $ 3,500.00 $ 3,500.00 $ -
Office Supplies $ 2,200.00 $1,006.89 $ 1,193.11
Balance as of: 03/15/11
Page 167
2:27 PM Robbins Hose Company # 1, Inc.
03/26/11 Profit & Loss Detail
Accrual Basis February 2011
Type Date Num Name Memo Clr Split Amount Balance
Ordinary Income/Expense
Expense
Apparatus Repairs & Maintenance
Check 2/12/2011 366 Atlantic Emergency ... MORO694M... City Fund Acco... 598.67 598.67
Check 2/12/2011 366 Atlantic Emergency ... MORO721-A... City Fund Acco... 120.00 718.67
Check 2/12/2011 366 Atlantic Emergency ... MORO764M... City Fund Acco... 280.50 999.17
Check 2/12/2011 366 Atlantic Emergency ... MORO774 City Fund Acco... 70.13 1,069.30
Check 2/12/2011 371 Townsend Bros. Ch... Inv- Car 16 Oi... City Fund Acco... 39.86 1,109.16
Check 2/19/2011 374 Atlantic Emergency ... MORO782M... City Fund Acco... 88.00 1,197.16
Check 2/19/2011 374 Atlantic Emergency ... MORO794M... City Fund Acco... 322.43 1,519.59
Check 2/26/2011 386 Atlantic Emergency ... Inv MORO82... City Fund Acco... 1,287.87 2,807.46
Total Apparatus Repairs & Maintenance 2,807.46 2,807.46
Electricity
Check 2/6/2011 363 City of Dover Sta 1- Dec 30... City Fund Acco... 2,962.17 2,962.17
Check 2/12/2011 368 City of Dover Sta 2 Electric-... City Fund Acco... 687.83 3,650.00
Total Electricity 3,650.00 3,650.00
Gasoline
Check 2/19/2011 375 City of Dover Unleaded-155... City Fund Acco... 1,010.80 1,010.80
Check 2/20/2011 384 Sam's Club Unleaded Fue... City Fund Acco... 60.90 1,071.70
Total Gasoline 1,071.70 1,071.70
Heating Expenses- Gas
Check 2/6/2011 362 Chesapeake Utilities Sta 2- Dec 29... City Fund Acco... 1,064.57 1,064.57
Check 2/12/2011 367 Chesapeake Utilities Sta 1- Jan 5th... City Fund Acco... 2,559.90 3,624.47
Total Heating Expenses- Gas 3,624.47 3,624.47
Office Supplies
Check 2/19/2011 375 City of Dover Postage- Jan... City Fund Acco... 25.19 25.19
Check 2/19/2011 379 Rebecca Rollison Reimburseme... City Fund Acco... 25.62 50.81
Check 2/19/2011 382 Staples Monthly State... City Fund Acco... 167.47 218.28
Total Office Supplies 218.28 218.28
Program Expenses
Check 2/12/2011 370 Municipal Emergenc... Invoice-00214... City Fund Acco... 3,900.00 3,900.00
Check 2/20/2011 385 Wilmington Trust Workstation ... City Fund Acco... 477.69 4,377.69
Total Program Expenses 4,377.69 4,377.69
Small Tolls
Check 2/12/2011 373 Rommel's ACE Ref-20582-20... City Fund Acco... 59.91 59.91
Check 2/19/2011 376 Detroit Industrial Tool Sales Invoice-... City Fund Acco... 293.87 353.78
Check 2/19/2011 378 Pugh's Service, Inc. Inv K2826651 City Fund Acco... 103.58 457.36
Check 2/19/2011 381 Kunkel Auto Supply Monthly State... City Fund Acco... 60.37 517.73
Check 2/20/2011 385 Wilmington Trust Advance Auto... City Fund Acco... 73.96 591.69
Total Small Tolls 591.69 591.69
Page 1
Page 168
2:27 PM Robbins Hose Company # 1, Inc.
03/26/11 Profit & Loss Detail
Accrual Basis February 2011
Type Date Num Name Memo Clr Split Amount Balance
Telephone
Check 2/6/2011 365 Verizon Wireless Jan 21 to Feb ... City Fund Acco... 410.56 410.56
Check 2/19/2011 375 City of Dover Verizon Phon... City Fund Acco... 733.15 1,143.71
Check 2/19/2011 375 City of Dover Cavalier Phon... City Fund Acco... 14.79 1,158.50
Total Telephone 1,158.50 1,158.50
Training & Travel Expenses
Check 2/6/2011 364 National Academy of... CDE Testing f... City Fund Acco... 30.00 30.00
Check 2/12/2011 369 Delaware State Fire ... Inv 11-2056 City Fund Acco... 200.00 230.00
Total Training & Travel Expenses 230.00 230.00
Uniforms
Check 2/12/2011 370 Municipal Emergenc... Invoice- 0021... City Fund Acco... 2,732.54 2,732.54
Check 2/19/2011 377 Municipal Emergenc... Inv 00204812... City Fund Acco... 340.25 3,072.79
Check 2/19/2011 380 Witmer Public Safety City Fund Acco... 153.70 3,226.49
Check 2/20/2011 383 Salamander Technol... Inv 7953 City Fund Acco... 156.00 3,382.49
Total Uniforms 3,382.49 3,382.49
Water/Sewer
Check 2/6/2011 363 City of Dover " " " "... City Fund Acco... 194.84 194.84
Check 2/12/2011 368 City of Dover Sta 2 Water &... City Fund Acco... 20.58 215.42
Total Water/Sewer 215.42 215.42
Total Expense 21,327.70 21,327.70
Net Ordinary Income -21,327.70 -21,327.70
Net Income -21,327.70 -21,327.70
Page 2
Page 169
City of Dover
Capital Investment Plan
Project Tracking Report
February 28, 2011
Points to Remember -
* Original Project Budget = Original Total Project Budget initially included in approved annual budget.
* Latest Project Budget = Revised Total Project Budget included in most recent approved annual budget or one of the following:
bond resolution, revolving fund loan agreement, Council approved budget amendment, or City Manager approved amendment as per
the Budget Amendment Procedure.
* Current Fiscal Year - Revised Fiscal Year Budget = Current Year approved project budgets plus carry forward balances of unspent
budgets in the prior fiscal year. Project Carry Forward balances will be submitted to City Council for amendment in January 2010.
Can also be amended with City Manager approval per the Budget Amendment Procedure.
* Water Quality, Inflow/Infiltration, Distribution Upgrades and New Development projects are budgeted as a blanket project and once
individual projects are identified and estimated they are created using an allocation of the overall budgeted amount.
* Status and Comments provided by City Manager.
* For Finance purposes projects are considered completed when placed in service and all charges have been processed.
Community Water & Total
Current Year Budget Funding Sources General Transportation Wastewater Electric CIP
Budget Balance $ 113,156 $ - $ - $ - $ 113,156
Project Carry Forward Balances 88,083 - 953,238 850,736 2 729
,729,628
Federal and/or State Grants 4,270,348 1,000,000 45,248 226,152 5,541,748
New Revolving Fund Loans - - 863,060 - 863,060
Carry Forward Construction Loan Balances - - 8,001,973 254,757 8,256,730
Bond Proceeds - - - 415,585 415,585
Impact Fees - - 758,821 - 758,821
Income from Sale of Assets - - - - -
Parkland Reserve 36,872 - - - 36,872
Library Reserve & Contributions 3,363,732 - - 3,363,732
Transfer from Operating Funds 1,019,629 300,000 58,709 2,797,792 4,176,130
Interest Earned 10,900 - - 40,700 51,600
Total Funding Sources (Unaudited) $ 8,902,720 $ 1,300,000 $ 10,681,049 $ 4,585,722 $ 26,307,062
Page 1 of 5
Page 170
City of Dover
General Fund - Major CIP Projects
February, 2011
Hide TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY2009
Bid Pack A - Done.
2 LB0901 M/G New Library Project $ 18,200,000 $ 24,679,934 $ 1,604,906 $ 23,075,028 6.5% $ 6,687,039 $ 7,630,663 $ 867,840 11.4% Started Bid Pack B - Construction Started.
3 Totals - FY09 $ 18,200,000 $ 24,679,934 $ 1,604,906 $ 23,075,028 6.5% $ 6,687,039 $ 7,630,663 $ 867,840 11.4%
4
5 FY2010
6 PR1001 Pitts Center Addition 50,000 40,000 28,629 11,371 71.6% - 36,872 25,501 69.2% Complete Complete.
7 Totals - FY10 $ 50,000 $ 40,000 $ 28,629 $ 11,371 71.6% $ - $ 36,872 $ 25,501 69.2%
8
9 FY2011
10 Vehicles & Equipment $ 63,675 $ 735,185 $ 461,492 $ 273,693 62.8% $ 735,185 $ 735,185 $ 461,492 62.8% Started Vehicles being ordered.
Core Law Enforcement Server
11 PD1001 Replacement - 53,500 35,708 17,792 66.7% - 53,500 35,708 66.7% Started Specifications done.
12 PD1101 Public Assembly Room Upgrade - 20,000 - 20,000 0.0% - 20,000 - 0.0%
13 PR1101 Playground Improv Program - 15,000 12,952 2,048 86.3% 15,000 15,000 12,952 86.3% Complete BB Courts paved.
14 PR1102 Skate Park - 30,000 - 30,000 0.0% 30,000 30,000 - 0.0% Not Started In discussions with equipment provider.
15 ST1101 Concrete Program 50,000 50,000 45,759 4,241 91.5% 50,000 50,000 45,759 91.5% Started Complete with contractor portion.
16 ST1102 Transfer to CT Fund 300,000 300,000 300,000 - 0.0% 300,000 300,000 300,000 100.0% Started Transfer to Com Transp Fund - December.
17 MR1101 Downtown Security Cameras 31,500 31,500 17,325 14,175 55.0% 31,500 31,500 17,325 55.0% Started Contract signed.
18 Totals - FY11 $ 445,175 $ 1,235,185 $ 873,236 $ 361,949 70.7% $ 1,161,685 $ 1,235,185 $ 873,236 70.7%
19
20 Grand Totals $ 18,695,175 $ 25,955,119 $ 2,506,770 $ 23,448,349 9.7% $ 7,848,724 $ 8,902,720 $ 1,766,576 19.8%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
G = Grant funded project
Page 2 of 5
Page 171
City of Dover
Community Transportation & General Fund Street Funds - Major CIP Projects
February, 2011
Hide TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project Current Revised Fiscal
Project Project Project To Date Budget % Budget Fiscal Yr. Fiscal Yr. YTD % Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY 2006
2 TE0601 M Lincoln Park Center $ 400,000 $ 479,148 $ 441,498 $ 37,650 92.1% $ 121,891 $ 121,891 $ 84,241 69.1% Started Ongoing.
3 Totals $ 400,000 $ 479,148 $ 441,498 $ 37,650 92.1% $ 121,891 $ 121,891 $ 84,241 69.1%
4
5 FY 2007
6 E. Water Street Brick $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ 65,000 $ 65,000 $ - 0.0% Specialty contract needed.
7 Totals $ 65,000 $ 65,000 $ - $ 65,000 0.0% $ 65,000 $ 65,000 $ - 0.0%
8
9 FY 2009
Trying to move this to Library Project if
10 Schutte Parking Lot $ 21,950 $ 21,950 $ - $ 21,950 0.0% $ 21,950 $ 21,950 $ - 0.0% State approves.
11 Turnberry Drive 40,000 40,000 40,000 - 100.0% 40,000 40,000 40,000 100.0% Curb work complete, paving in process.
12 Totals $ 61,950 $ 61,950 $ 40,000 $ 21,950 64.6% $ 61,950 $ 61,950 $ 40,000 64.6%
13
14 FY 2011
15 CT1051 Washington Street $ 104,000 $ 104,000 $ 104,000 $ - 100.0% $ 104,000 $ 104,000 $ 104,000 100.0% Complete.
16 CT1108 Mitschner Road (incl. CDBG) 169,066 272,779 246,672 26,107 90.4% 272,779 272,779 246,672 90.4% In progress.
17 CT1086 Delaware Ave 6,250 6,250 6,250 - 100.0% 6,250 6,250 6,250 100.0% Complete.
18 CT1118 Oak Road Signage 11,875 11,875 10,375 1,500 87.4% 11,875 11,875 10,375 87.4% Just received.
19 CT1142 Governor's Ave. Rebuild 1,000 1,000 - 1,000 0.0% 1,000 1,000 - 0.0%
20 CT1161 Towne Point 7,500 7,500 - 7,500 0.0% 7,500 7,500 - 0.0%
CT1162 Library Access Rd. 105,000 105,000 - 105,000 0.0% 105,000 105,000 - 0.0%
21 ST1101 Street & Alley Program 300,000 300,000 179,271 120,729 59.8% 300,000 300,000 179,271 59.8% In progress.
22 State Agreements not yet rec'd 458,968 346,468 - 346,468 0.0% 242,755 242,755 - 0.0% Agreements have not been received.
23 Totals $ 1,163,659 $ 1,154,872 $ 546,569 $ 608,303 47.3% $ 1,051,159 $ 1,051,159 $ 546,569 52.0%
24
25 Grand Totals $ 1,690,609 $ 1,760,970 $ 1,028,067 $ 732,903 58.4% $ 1,300,000 $ 1,300,000 $ 670,810 51.6%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
Page 3 of 5
Page 172
City of Dover
Water/Wastewater Improvement & Extension Fund - Major CIP Projects
February, 2011
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Approved Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY 2008
2 WD0807 South Governors Ave. Water Main Upgrade $ 200,000 $ 200,000 $ 2,664 $ 197,336 1.3% $ - $ 197,336 $ - 0.0% Complete Done.
Selecting Tank Model & Site; FY11 =
3 WD0804 M 1.0 MG Elevated Water Storage Tower 4,196,600 2,590,000 12,847 2,577,153 0.5% - 193,377 6,224 3.2% Started Constr.
4 WD0805 M Piney Point Well 398,800 665,000 63,499 601,501 9.5% - 162,525 11,024 6.8% Started DNREC permiting; FY11 = Constr.
5 WW0809 M South Governors Ave. Sewer Main 300,000 291,000 13,561 277,439 4.7% - 279,244 1,805 0.6% Complete Done.
6 WW0810 M/SL US 13 East Sanitary Sewer Interceptor 2,376,800 3,409,641 2,884,955 524,686 84.6% - 2,335,862 2,016,793 86.3% Complete Done.
7 Totals - FY08 $ 7,472,200 $ 7,155,641 $ 2,977,526 $ 4,178,115 41.6% $ - $ 3,168,344 $ 2,035,846 64.3%
8
9 FY2009
10 WQ0905 M/SL Bayard Avenue $ 590,910 $ 590,910 $ 243,276 $ 347,634 41.2% $ - $ 584,420 $ 236,786 40.5% Started Starting construction in March.
11 WQ0906 M/SL East side N. State Street 868,707 877,596 177,178 700,418 20.2% - 847,700 148,175 17.5% Started Phase one complete.
12 WQ0907 M/SL Route 13 Water Main 1,058,700 1,035,898 148,606 887,292 14.3% - 967,801 24,610 2.5% Started Going to bid. Start in May.
13 Water Quality Improvements FY09 $ 2,518,317 $ 2,504,404 $ 569,060 $ 1,935,344 22.7% $ - $ 2,399,921 $ 409,571 60.5% Started
14
15 WW0902 M/SL DE State University Pumping Station $ 386,400 $ 386,400 $ 293,367 $ 93,033 75.9% - 240,324 147,652 61.4% Completed Done.
Done. Overage covered by US 13
16 WW0905 M/SL Fox Hall/Retreat Force Main Rerouting 133,100 139,245 238,789 (99,544) 171.5% - - 20,351 0.0% Completed Interceptor (WW0810).
17 WW0907 M/SL Acorn Lane Pump Station Replace. 386,400 386,400 294,040 92,360 76.1% - 210,528 118,529 56.3% Completed Done.
18 Totals - FY09 $ 3,424,217 $ 3,416,449 $ 1,395,256 $ 2,021,193 40.8% $ - $ 2,850,773 $ 696,104 24.4%
19
20 FY2010
21 WD1002 R Remote Control & Monitor Wells $ 55,000 $ 55,000 $ 23,104 $ 31,896 42.0% $ - $ 31,896 $ - 0.0% Started Material ordered.
22 WW1001 M/SL Inflow/Infiltration Removal 1,800,000 1,800,000 1,221 1,798,779 0.1% - 1,798,447 - 0.0% Started Construction to start in July.
23 WW1007 M/SL Fox Hall Pump Station 427,900 52,000 46,076 5,924 88.6% 375,900 426,044 44,220 10.4% Started Out to bid.
24 WW1008 M/SL Heatherfield Force Main Rerouting 220,400 40,000 35,534 4,466 88.8% 229,200 267,916 34,250 12.8% Started Out ot bid.
25 WW1010 I Tar Ditch Interceptor Upgrade 518,230 518,230 15,081 503,149 2.9% - 516,781 13,632 2.6% Started Reviewing design.
26 WS1001 Various Pump Motor Replacements 45,248 45,248 - 45,248 0.0% - 45,248 - 0.0% Started Grant approved. Ordering begun.
27 Totals - FY10 $ 3 066
,066,778 $ 2 510
,510,478 $ 121,017 $ 2 389
,389,461 4.8% $ 605,100 $ 3 086
,086,332 $ 92,103 3.0%
28
29 FY2011
30 WD1101 Misc. Distribution System Upgrade $ 60,000 $ 60,000 $ - $ 60,000 0.0% $ 60,000 $ 60,000 $ - 0.0% Started On-going as needed.
31 WD1102 Wellhead Redevelopement Program 60,000 60,000 - 60,000 0.0% 60,000 60,000 - 0.0% Started Work starting in March\April.
32 WQ1101 WQI - Loockerman Street 500,000 60,000 35,677 24,323 59.5% 500,000 60,000 35,677 59.5% Not Started See above FY09.
33 WQ1102 WQI - Columbia Avenue - 303,000 637.50 302,363 0.2% - 303,000 638 0.2% Not Started See above FY09.
34 WQ1103 WQI - Ross Street - 117,000 637.50 116,363 0.5% - 117,000 638 0.5% Not Started See above FY09.
35 WQ1104 WQI - William Street - 10,000 637.50 9,363 6.4% - 10,000 638 6.4% Not Started See above FY09.
36 WQ1105 WQI - West Street (W. Alley) - 10,000 637.50 9,363 6.4% - 10,000 638 6.4% Not Started See above FY09.
37 WW1101 M/SL Inflow/Infiltration Removal 500,000 500,000 6,113.82 493,886 1.2% 500,000 500,000 6,114 1.2% Started Will start after FY10 is done.
38 WW1102 R Scada Technology Equip Upgrade 82,100 82,100 63,589 18,511 77.5% 82,100 82,100 63,589 77.5% Started 4 of 7 installed.
Shifted completion to interceptor
39 WW1103 Del State/Del Tech Force Main Rerouting 286,500 286,500 3,451 283,049 1.2% 286,500 286,500 3,451 1.2% Done (WW0810).
40 WW1104 SL Lepore Road Pump Station Replacement 52,000 52,000 13,135 38,865 25.3% 52,000 52,000 13,135 25.3% Started Design with Braun.
41 WW1105 R Misc. Sewer System Improvements 35,000 35,000 35,152 (152) 100.4% 35,000 35,000 35,152 100.4% Started Ongoing as needed.
42 Totals - FY11 $ 1,575,600 $ 1,575,600 $ 159,668 $ 1,415,932 10.1% $ 1,575,600 $ 1,575,600 $ 159,668 10.1%
43
44 Grand Totals $ 15,538,795 $ 14,658,168 $ 4,653,466 $ 10,004,702 31.7% $ 2,180,700 $ 10,681,049 $ 2,983,720 27.9%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
SL = State Loan Project - construction phase is financed
I = Impact Fee Financed Project
Page 4 of 5
Page 173
City of Dover
Electric Improvement & Extension Fund - Major CIP Projects
February, 2011
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Hide Original Latest Project Project % Current Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Yr. Fiscal Yr. YTD Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Spent Status Comments
1 FY 2006
2 EE0601 M/B 69 KV feeders 3 and 4 $ 11,060,000 $ 8,693,782 $ 8,761,762 $ (67,980) 100.8% $ - $ 4,242 $ 4,242 100.0% Completed In service.
3 EE0603 M/S Governor's Avenue Rebuild 1,268,450 2,068,260 550,725 1,517,535 26.6% - 250,000 30,264 12.1% Completed Done.
4 Totals - FY06 $ 12,328,450 $ 10,762,042 $ 9,312,486 $ 1,449,556 86.5% $ - $ 254,242 $ 34,506 13.6%
5
6 FY 2008
Unit 3 Turb Bearing Fire Protect
7 EG0801 Deluge $ 50,000 $ 50,000 $ 44,720 $ 5,280 89.4% $ - $ 50,000 $ 44,720 89.4% Completed
8 Totals - FY08 $ 50,000 $ 50,000 $ 44,720 $ 5,280 89.4% $ - $ 50,000 $ 44,720 89.4%
9
10 FY2010
11 EG1001 B Vansant CT Mark IV Control (Replmnt) $ 700,000 $ 610,000 $ 438,687 $ 171,313 71.9% $ - $ 152,050 $ 152,050 100.0% Completed In service.
12 EG1002 B McKee Run Entrance Road 240,000 240,000 154,722 85,278 64.5% - 154,244 154,244 100.0% Completed In service.
13 EG1005 Work Mgmt. System Replacement 85,000 85,000 26,577 58,423 31.3% - - 9,859 0.0% Completed Done.
14 EG1009 Photovoltaic Install @ McKee Run - 65,065 65,065 - 100.0% - 65,065 65,065 100.0% Completed In service.
15 EE1005 M/B Mid City Substation 1,488,461 993,711 975,819 17,892 98.2% - 1,087 1,087 100.0% Completed In service.
16 EE1009 S LED Lighting Replacement 70,087 70,010 70,010 0 100.0% - 70,010 70,010 100.0% Completed Installed on Division.
17 EU1002 B Crossgates 396,904 543,075 524,391 18,684 96.6% - 1,441 1,440 100.0% Completed Done.
18 EU1003 B Buchanan Acres 406,000 1,094,646 1,207,967 (113,321) 110.4% - 129,502 129,502 100.0% Completed Done.
19
20 Totals - FY10 $ 3,386,452 $ 3,701,507 $ 3,463,238 $ 238,269 93.6% $ - $ 573,399 $ 583,257 101.7%
21
22 FY2011
23 --- Vehicles & Equipment $ 158,200 $ 158,200 $ 113,437 $ 44,763 71.7% $ 158,200 $ 158,200 $ 113,437 71.7% Started Vehicles being ordered.
24 EE1101 Substation PT & CT Replacement 256,218 256,218 202,419 53,799 79.0% 256,218 256,218 202,419 79.0% Started Material being received.
25 EE1102 Replace of 69 kV Breakers 100,000 100,000 60,792 39,208 60.8% 100,000 100,000 60,792 60.8% Completed Installed.
26 EE1103 Lighting Rehabilitation 100,000 107,645 107,644 1 100.0% 100,000 107,645 107,644 100.0% Completed Fox Hall done.
27 EE1104 Walker Road OH Conversion 350,511 - - - 0.0% 350,511 - - 0.0% Dropped Funds reappropriated.
pp
28 EE1105 Engineering Misc Equipment Replmnt 40,000 40,000 24,751 15,249 61.9% 40,000 40,000 24,751 61.9% Started Ongoing as needed.
29 EE1106 Substation Batteries 24,500 24,500 23,489 1,011 95.9% 24,500 24,500 23,489 95.9% Completed Done.
30 EE1107 Wyoming Mill Road Realignment - 91,000 705 90,295 0.0% - 91,000 705 0.8% Started Electric line relocation.
31 EE1111 UG Transformers 120,536 120,536 77,703 42,833 64.5% 120,536 120,536 77,703 64.5% Started Ongoing as needed.
32 EE1111 UG Conductors 529,464 521,896 179,199 342,697 34.3% 529,464 521,896 179,199 34.3% Started Ongoing as needed.
33 EE1111 Meters 50,000 50,000 52,151 (2,151) 104.3% 50,000 50,000 52,151 104.3% Started Ongoing as needed.
34 EE1112 69kV Sub Switch Replacement - 180,000 - 180,000 0.0% - 180,000 - 0.0%
35 EG1101 Unit 3 Cooling Tower Fill 353,338 398,338 371,513 26,825 93.3% 353,338 398,338 371,513 93.3% Completed Done.
36 EG1102 Units 1 & 2 Cooling Tower 218,730 173,730 70,280 103,450 40.5% 218,730 173,730 70,280 40.5% Completed Done.
37 EG1103 Unit 3 Tubine Inspection 348,000 - - - 0.0% 348,000 - - 0.0% Started Scoping construction in FY12.
Funding reallocated to Unit 1
38 EG1104 Unit 3 Aux System Components 113,000 - - - 0.0% 113,000 - - 0.0% Deferred repair. Defered to FY12.
39 EG1105 Plant Misc Equipment Replmnt 71,000 77,000 66,051 10,949 85.8% 71,000 77,000 66,051 85.8% Started Ongoing as needed.
Funding reallocated Unit 1
40 EG1106 Unit 3 Stack Repairs 25,000 - - - 0.0% 25,000 - - 0.0% Deffered repair. Defered to FY12.
Scoping, some funding
41 EG1107 Units 1 & 2 Life Extension 276,000 225,000 41,546 183,454 18.5% 276,000 225,000 41,546 18.5% Started reallocated Unit 1 repair.
Emergency repair; Budget
42 EG1108 Unit 1 Turbine Outage - 412,000 424,747 (12,747) 0.0% - 412,000 424,747 103.1% Completed amendment approved in Dec.
43 EG1109 Unit 3 FD & ID FAN CNRL UP 45,000 - - - 0.0% 45,000 - - 0.0% Deferred Next fiscal year.
44 EG1110 Unit 3 DCS Com & Software 30,000 - - - 0.0% 30,000 - - 0.0% Deffered Next fiscal year.
45 EG1111 Unit 2 Boiler Inspection & Repair - 124,000 102,151 21,849 82.4% - 124,000 102,151 82.4% Completed Emergency repair.
46 EG1112 Unit 3 Heat Expansion Joint - 65,000 - 65,000 0.0% - 65,000 - 0.0% Started Started with spring outage.
47 EG1113 Units 1 & 2 Control Modifications - 150,000 18,223 131,777 12.1% - 150,000 18,223 12.1% Started Started with spring outage.
48 EG1114 Unit 3 Gas Line Modification - 60,000 - 60,000 0.0% - 60,000 - 0.0% Started Started with spring outage.
49 EU1101 Distribution Upgrades 400,000 373,018 255,578 117,440 68.5% 400,000 373,018 255,578 68.5% Started Ongoing as needed.
50 $ 3,609,497 $ 3,708,081 $ 2,192,378 $ 1,515,703 59.1% $ 3,609,497 $ 3,708,081 $ 2,192,378 59.1%
51
52 Grand Totals $ 19,374,399 $ 18,221,630 $ 15,012,823 $ 3,208,807 82.4% $ 3,609,497 $ 4,585,722 $ 2,854,861 62.3%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years.
R = Recurring project - a project that begins and ends each fiscal year and is rebudgeted to start over each fiscal year.
B = Bonded Project
S = State fully or partially reimbursed project
Page 5 of 5
Page 174
FIRST READING
1 of 1
CITY OF DOVER PROPOSED ORDINANCE #2011-10
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
2 The amounts hereinafter named in various City funds are changed from the currently approved revenues/receipts
3 and appropriations to the revised revenues/receipts and revised appropriations for use by the various
4 departments of the Municipal Government for:
5 2010-2011 Budget Ordinances
6 A. GENERAL FUND - Expenditures
7 Current Additions Revised
8 EXPENDITURES Budgets (Reductions) Budgets
9 Pension Unfunded Liability $ 995,000 $ 454,978 $ 1,449,978
10 Current Year Balance 3,651,444 (454,978) 3,196,466
11 Net Adjustments $ -
12 B ELECTRIC REVENUE FUND - Expenses
13 Current Additions Revised
14 EXPENSES Budgets (Reductions) Budgets
15 Pension Unfunded Liability 833,000 277,477 1,110,477
16 Current Year Balance 10,947,900 (277,477) 10,670,423
17 Net Adjustments $ -
18 Comments:
19 1) Attached for reference is Ordinance 2011-09. See line numbers 102, 126, 329 and 348.
20 2) The General Fund current year balance meets the minimum policy requirement of 8%. The current balance
21 is 8.9% of revenue or $334,267 greater than the minimum requirement.
22 3) The Electric Fund current year balance meets the minimum policy requirement of 8%. The current balance
23 is 10.5% of revenue or $2,536,542 greater than the minimum requirement.
24 4) The total budget remains the same as in Ordinance 2011-09. The revisions have a zero sum effect.
Action History: April 11, 2011 Proposed First Reading
Page 175
Budget Ordinance 2011-10 Attachment
FINAL READING
CITY OF DOVER PROPOSED ORDINANCE #2011‐09
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
2 The amounts hereinafternamed in various City funds are changes from the currently approved
3 revenues/receipts and appropriations to the revised revenues/receipts and revised
4 appropriations for use by the various departments of the Municipal Government for:
5
6 20010‐2011 BUDGET ORDINANCES
7 GENERAL FUND
8 CASH RECEIPTS AND BUDGET FOR 2010‐2011
9 INFO ONLY
10 2010‐11 2010‐11
11 LATEST EST ADJMTS REVISED
12 RECEIPTS
13 PRIOR YEAR BALANCE 1,034 2,655,562
14 FINES AND POLICE REVENUE 42,387 578,889
15 911 FEE 15,000 60,000
16 INVESTMENT INCOME (108,000) 116,000
17 LIBRARY REVENUES ‐ 64,189
18 KENT COUNTY BOOK REIMBURSEMENT ‐ 460,000
19 BUSINESS LICENSES ‐ 1,523,675
20 PERMITS AND OTHER LICENSES (42,000) 892,000
21 DEMOLITION REVENUE ‐ ‐
22 MISCELLANEOUS CHARGES 11,500 65,750
23 POLICE EXTRA DUTY ‐ 300,000
24 PROPERTY TAXES ‐ 10,982,634
25 BID REVENUE ‐ 52,692
26 RECREATION REVENUE ‐ 141,500
27 FRANCHISE FEE 34,000 520,000
28 TRASH FEES (194,511) 2,050,000
29 DSWA TRASH FEE REBATE ‐ 143,000
30 RENT REVENUE ‐ GARRISON FARM ‐ 87,000
31 COURT OF CHANCERY FEES ‐ 645,000
32 RECEIPTS SUBTOTAL (240,590) 21,337,891
33 INTERFUND SERVICE RECEIPTS
34 INTRAFUND SERVICE RECEIPTS WATER/WASTEWATER (14,631) 958,258
35 INTRAFUND SERVICE RECEIPTS ELECTRIC (33,445) 3,341,500
36 INTERFUND SERVICE RECEIPTS SUBTOTAL (48,076) 4,299,758
37 GRANTS
38 POLICE RELATED (58,350) 80,000
39 CAPITAL SCHOOL DISTRICT REVENUE ‐ 73,500
40 POLICE PENSION GRANT ‐ 620,000
41 RECREATION GRANTS 51,000 51,000
42 MISC GRANT REVENUE ‐ ‐
43 HOMELAND SECURITY GRANT 188,061 188,061
44 SALE OF ASSETS ‐ ‐
45 GRANTS SUBTOTAL 180,711 1,012,561
Page 1
Page 176
Budget Ordinance 2011-10 Attachment
46 20010‐2011 BUDGET ORDINANCES
47 GENERAL FUND ‐ CONTINUED
48 INFO ONLY
49 2010‐11 2010‐11
50 LATEST EST ADJMTS REVISED
51
52 TRANSFERS FROM
53 TRANSFER TAX 750,000 1,400,000
54 MUNICIPAL STREET AID ‐ 526,843
55 CIVIL TRAFFIC PENALTIES 70,000 1,000,000
56 WATER/WASTEWATER ‐ ‐
57 ELECTRIC ‐ 8,856,000
58 PARKLAND RESERVE ‐ ‐
59 LIBRARY RESERVE ‐ ‐
60 CAPITAL ASSET RESERVE ‐ ‐
61 WORKER'S COMP FUND ‐ ‐
62 CONTINGENCY FUND ‐
63 TRANSFERS FROM SUBTOTAL 820,000 11,782,843
65 TOTALS 712,045 38,433,053
66
67 EXPENSES
68 CITY CLERK (3,035) 284,368
69 COUNCIL ‐ 130,769
70 TAX ASSESSOR 69,497 266,746
71 FIRE (44,130) 665,732
72 GROUNDS MAINTENANCE (23,668) 1,031,889
73 LIBRARY (46,711) 1,079,516
74 RECREATION 38,157 816,626
75 LIFE SAFETY 15,757 517,592
76 CODE INFORCEMENT 18,229 295,010
77 PLANNING ‐ 422,893
78 INSPECTIONS 65,000 559,807
79 ECONOMIC DEVELOPMENT ‐ 247,488
80 POLICE (182,750) 12,275,623
81 POLICE EXTRA DUTY ‐ 449,516
82 STREETS 13,530 815,559
83 SANITATION (49,505) 2,297,839
84 CITY MANAGER 17,943 579,515
85 INFORMATION TECHNOLOGY (50,885) 697,329
86 FINANCE (22,000) 805,169
87 PUBLIC SERVICES ‐ ADMINISTRATION ‐ 369,752
88 FACILITIES MANAGEMENT (34,925) 955,832
89 CENTRAL SERVICES (13,133) 656,844
90 FLEET MAINTENANCE (30,297) 731,632
91 CUSTOMER SERVICES 4,219 873,623
92 HUMAN RESOURCES (12,500) 346,390
93 MAYOR ‐ 88,341
94 DEPARTMENT SUBTOTALS (271,207) 28,261,400
Page 2
Page 177
Budget Ordinance 2011-10 Attachment
95 20010‐2011 BUDGET ORDINANCES
96 GENERAL FUND ‐ CONTINUED
97 INFO ONLY
98 2010‐11 2010‐11
99 LATEST EST ADJMTS REVISED
100 RETIREES HEALTH CARE ‐ 1,297,509
101 RETIREES PAYMENTS ‐ ‐
102 PENSION UNFUNDED LIABILITY ‐ 995,000
103 POLICE PENSION UNFUNDED LIABILITY ‐ 95,000
104 POLICE PENSION FUND ‐ 620,000
105 OPEB ‐ ‐
106 UNCOLLECTIBLES ‐ TRASH AND OTHER 100,000 110,000
107 LOSS ON SALE OF ASSET ‐ ‐
108 STORM EMERGENCY ‐ ‐
109 STREET LIGHTS ‐ 985,000
110 OTHER EXPENSE SUBTOTAL 272,061 5,206,370
111 GRANTS
112 IT EMERGENCY PREPAREDNESS PLAN ‐ ‐
113 GRANTS SUBTOTAL ‐ ‐
114 TRANSFERS
115 TRANSFER TO PENSION COLA ‐ ‐
116 TRANSFER TO CAPITAL ASSET RESERVE ‐ ‐
117 TRANSFER TO CAPITAL FUND ‐ PROJECTS ‐ 1,307,839
118 TRANSFER TO CAPITAL FUND ‐ RESERVE ‐ ‐
119 TRANSFER TO STREET PROGRAM ‐ ‐
120 TRANSFER TO PARKLAND/RECREATION RESERVE ‐ ‐
121 TRANSFER TO LIBRARY RESERVE ‐ ‐
122 TRANSFER TO CDBG FUND ‐ 6,000
123 TRANSFER TO VERIZON RESERVE ‐ ‐
124 INVENTORY WRITE OFFS ‐ ‐
125 TRANSFERS SUBTOTAL ‐ 1,313,839
126 CURRENT YEAR BALANCE 711,191 3,651,444
128 TOTALS $ 712,045 $ 38,433,053
Page 3
Page 178
Budget Ordinance 2011-10 Attachment
129 2010‐2011 BUDGET ORDINANCES
130 GENERAL CONTINGENCY FUND
131 CASH RECEIPTS AND EXPENDITURES FOR FISCAL 2010‐2011
132 INFO ONLY
133 2010‐11 2010‐11
134 LATEST EST ADJMTS REVISED
135 CASH RECEIPTS
136 BEGINNING BALANCE $ ‐ $ 530,393
137 INTEREST EARNINGS ‐ 23,100
138 REIMBURSEMENT FROM DEMA (SNOW EMERGENCY) 172,061 172,061
140 TOTALS 172,061 725,554
141
142 EXPENDITURES
143 TRANSFER TO GENERAL FUND ‐ ‐
144 TRANSFER TO OPEB ‐ ‐
145 TRANSFER TO LIBRARY FUND ‐ ‐
146 CARRY FORWARD TO NEXT YEAR 172,061 725,554
148 TOTALS $ 172,061 $ 725,554
Page 4
Page 179
Budget Ordinance 2011-10 Attachment
149 2010‐2011 BUDGET ORDINANCES
150 GOVERNMENTAL CAPITAL PROJECTS FUND
151 CASH RECEIPTS AND EXPENDITURES FOR FISCAL 2010‐2011
152 INFO ONLY
153 2010‐11 2010‐11
154 LATEST EST ADJMTS REVISED
155 CASH RECEIPTS
156 BEGINNING BALANCE ‐ PROJECTS $ ‐ $ 227,592
157 STATE GRANTS ‐ 4,232,348
158 INTEREST EARNINGS ‐ 10,900
159 INCOME FROM SALE OF ASSETS ‐ ‐
160 RECREATION GRANTS ‐ 34,583
161 POLICE GRANTS 20,000 38,000
162 HOMELAND SECURITY GRANTS ‐ ‐
163 LIBRARY BOND ISSUE/CONTRIBUTIONS ‐ 1,000,000
164 TRANSFER FROM GENERAL FUND FOR PROJECTS ‐ 1,307,839
165 TRANSFER FROM PARKLAND RESERVE (JWP CNTR) ‐ ‐
166 TRANSFER FROM LIBRARY RESERVE ‐ 2,363,732
167 GIFTS/DONATIONS (RECREATION) ‐ ‐
168 PARKLAND RESERVE RECEIPT ‐ 36,872
169 TRANSFER FROM CAPITAL ASSET RESERVE ‐ ‐
170 TOTALS 20,000 9,251,866
171
172 EXPENDITURES
173 CITY CLERK ‐ ‐
174 COUNCIL ‐ ‐
175 TAX ASSESSOR ‐ ‐
176 FIRE ‐ 223,700
177 GROUNDS MAINTENANCE (17,158) 46,517
178 LIBRARY ‐ 7,630,663
179 RECREATION ‐ 81,872
180 LIFE SAFETY ‐ ‐
181 PLANNING ‐ ‐
182 INSPECTIONS ‐ ‐
183 ECONOMIC DEVELOPMENT ‐ ‐
184 POLICE 7,648 343,528
185 STREETS (26,579) 454,476
186 SANITATION (33,656) 212,419
187 CITY MANAGER ‐ ‐
188 INFORMATION TECHNOLOGY (5,000) 7,000
189 FINANCE ‐ ‐
190 PUBLIC SERVICES ‐ ADMINISTRATION ‐ ‐
191 FACILITIES MANAGEMENT ‐ ‐
192 CENTRAL SERVICES ‐ ‐
193 FLEET MAINTENANCE ‐ ‐
194 CUSTOMER SERVICES ‐ ‐
195 HUMAN RESOURCES ‐ ‐
196 MAYOR ‐ 31,500
197 DEPARTMENT SUBTOTAL (74,745) 9,031,675
198 TRANSFERS
199 TRANSFER TO CAPITAL ASSET RESERVE ‐ ‐
200 TRANSFER TO PARKLAND RESERVE ‐ ‐
201 TRANSFER TO LIBRARY RESERVE ‐ ‐
202 TRANSFER TO GENERAL FUND ‐ ‐
203 TRANSFER TO COMMUNITY TRANS. FUND 318 25,000 25,000
204 TRANSFER SUBTOTAL 25,000 25,000
205 CURRENT YEAR BALANCE 69,745 195,191
207 TOTALS $ 20,000 $ 9,251,866
Page 5
Page 180
Budget Ordinance 2011-10 Attachment
208 2010‐2011 BUDGET ORDINANCES
209 WATER/WASTEWATER FUND
210 REVENUES AND EXPENSES FOR FISCAL 2010‐2011
211 INFO ONLY
212 2010‐11 2010‐11
213 LATEST EST ADJMTS REVISED
214 REVENUE
215 PRIOR YEAR BALANCE ‐ WATER $ 353 $ 1,236,546
216 PRIOR YEAR BALANCE ‐ WASTEWATER ‐ 902,719
217 PRIOR YEAR BALANCE ‐ KCSA (353) (1,872,434)
218 WATER FEES ‐ 4,206,700
219 WASTEWATER FEES ‐ 3,308,300
220 WASTEWATER ADJUSTMENT FEES ‐ 4,275,600
221 WATER TANK SPACE LEASING ‐ 299,400
222 SEWER IMPACT FEES ‐ 323,000
223 WATER IMPACT FEES ‐ 357,000
224 INTEREST ‐ WATER 8,206 8,886
225 INTEREST ‐ WASTEWATER 10,079 10,914
226 MISCELLANEOUS SERVICE FEE ‐ 71,000
227 REVENUE SUBTOTAL 18,285 13,127,631
228 GRANTS AND REIMBURSEMENTS
229 STATE REIMBURSEMENT ‐ ‐
230 GRANT REVENUE ‐ ‐
231 GRANTS AND REIMBURSEMENTS SUBTOTAL ‐ ‐
232 TRANSFERS FROM
233 TRANSFER FROM CAPITAL ASSET RESERVE ‐ ‐
234 TRANSFER FROM CONTINGENCY ‐ ‐
235 TRANSFERS FROM SUBTOTAL ‐ ‐
237 TOTALS $ 18,285 $ 13,127,631
Page 6
Page 181
Budget Ordinance 2011-10 Attachment
238 2010‐2011 BUDGET ORDINANCES
239 WATER/WASTEWATER FUND ‐ CONTINUED
240 INFO ONLY
241 2010‐11 2010‐11
242 LATEST EST ADJMTS REVISED
243 EXPENSES
244 ENGINEERING & INSPECTION $ (70,548) $ 572,330
245 WATER CONSTRUCTION 8,362 400,923
246 WATER DEPARTMENT (26,692) 385,896
247 WATER TREATMENT PLANT 12,390 1,512,247
248 WASTEWATER DEPARTMENT (45,852) 923,910
249 KENT COUNTY TREATMENT CHARGE 4,235,403
250 DIRECT EXPENDITURE SUBTOTAL (122,340) 8,030,709
251 OTHER EXPENSES
252 DEBT SERVICE ‐ WATER ‐ 246,403
253 DEBT SERVICE ‐ WASTEWATER ‐ 316,198
254 RETIREES HEALTH CARE ‐ 177,427
255 PENSION UNFUNDED LIABILITY ‐ 372,000
256 OPEB ‐
257 UNCOLLECTIBLES ‐ TRASH AND OTHER 71,000 71,000
258 INTRAFUND SERVICE FEES (140,756) 1,131,575
259 ARBITRAGE PAYMENT 60/40 Water ‐
260 OTHER EXPENSES SUBTOTAL (69,756) 2,314,603
261 TRANSFER TO
262 GENERAL FUND FROM WATER ‐ ‐
263 GENERAL FUND FROM WASTEWATER ‐ ‐
264 WATER IMP AND EXT ‐ 500,000
265 WASTEWATER IMP AND EXT ‐ 500,000
266 TRANSFER TO PENSION COLA ‐ ‐
267 SEWER IMPACT FEE RESERVE ‐ 6,802
268 WATER IMPACT FEE RESERVE ‐ 110,597
269 CAPITAL ASSET RESERVE WATER ‐ 100,000
270 CAPITAL ASSET RESERVE WASTEWATER ‐ 100,000
271 TRANSFER TO SUBTOTAL ‐ 1,317,399
272 CURRENT YEAR BALANCES
273 CURRENT YEAR BALANCE WATER 85,223 1,726,372
274 CURRENT YEAR BALANCE WASTEWATER 125,158 1,570,432
275 CURRENT YEAR BALANCE KCSA (1,831,884)
276 CURRENT YEAR BALANCE SUBTOTALS 210,381 1,464,920
278 TOTALS $ 18,285 $ 13,127,631
Page 7
Page 182
Budget Ordinance 2011-10 Attachment
279 2010‐2011 BUDGET ORDINANCES
280 ELECTRIC REVENUE FUND
281 REVENUES AND EXPENSES FOR FISCAL 2010‐2011
282 INFO ONLY
283 2010‐11 2010‐11
284 LATEST EST ADJMTS REVISED
285 REVENUE
286 PRIOR YEAR BALANCE $ ‐ $ 13,537,864
287 DIRECT SALES TO CUSTOMER 1,321,906 97,917,206
288 PURCHASE POWER ADJUSTMENT (293,603) (2,293,603)
289 UTILITY TAX 100,200 1,965,000
290 GREEN ENERGY 128,600
291 MISCELLANEOUS REVENUE 891,200
292 RENT REVENUE 186,816
293 EMISSION CREDIT SALES ‐
294 TRANSFER FROM CONTINGENCY ‐ 301,070
295 INTRAFUND SERVICE RECEIPTS WATER/WASTEWATER (126,125) 173,317
296 REIMBURSEMENT OF BOND ISSUANCE COST ‐
297 INTEREST EARNINGS 44,600 110,300
299 TOTALS $ 1,046,978 $ 112,917,770
Page 8
Page 183
Budget Ordinance 2011-10 Attachment
300 2010‐2011 BUDGET ORDINANCES
301 ELECTRIC REVENUE FUND ‐ CONTINUED
302 INFO ONLY
303 2010‐11 2010‐11
304 LATEST EST ADJMTS REVISED
305 EXPENSES
306 POWER SUPPLY $ (425,336) $ 47,634,363
307 POWER SUPPLY MANAGEMENT 41,562 2,321,562
308 PJM CHARGES ‐ LOAD 1,512,556 13,363,432
309 CAPACITY CHARGES 684,169 12,302,392
310 RATE STABILIZATION CREDIT ‐ ‐
311 SUB‐TOTAL POWER SUPPLY 1,812,951 75,621,749
312 PLANT OPERATIONS 469,000 6,163,315
313 GENERATIONS FUELS 2,947,157 3,244,977
314 PJM CREDITS (4,832,607) (5,553,404)
315 CAPACITY CREDITS 69,062 (11,419,723)
316 GENERATION SUBTOTAL (1,347,388) (7,564,835)
317 POWER SUPPLY & GENERATION SUBTOTAL 465,563 68,056,914
318 DIRECT EXPENDITURES
319 TRANSMISSION/DISTRIBUTION (159,371) 3,047,144
320 ELECTRICAL ENGINEERING (87,898) 1,755,005
321 ADMINISTRATION 54,750 964,989
322 METER READING (13,253) 209,655
323 SYSTEMS OPERATIONS (25,560) 492,493
324 UTILITY TAX 100,200 1,965,000
325 DIRECT EXPENDITURE SUBTOTALS (131,132) 8,434,286
326 OTHER EXPENSES
327 ALLOW FOR UNCOLLECTIBLES 175,000 310,000
328 RETIREES HEALTH CARE ‐ 639,110
329 PENSION UNFUNDED LIABILITY ‐ 833,000
330 OPEB ‐ 1,200,000
331 GREEN ENERGY PAYMENT TO DEMEC ‐ 128,600
332 INTRAFUND SERVICE FEES (33,445) 3,341,500
333 INTEREST ON DEPOSITS ‐ 54,500
334 INVENTORY WRITE OFFS ‐ 175,000
335 BOND ISSUANCE COSTS ‐ ‐
336 POWER SUPPLY STUDY ‐ ‐
337 DEBT SERVICE (468,810) 3,589,890
338 OTHER EXPENSES SUBTOTAL (327,255) 10,271,600
339 TRANSFER TO
340 IMPROVEMENT & EXTENSION ‐ 3,500,000
341 GENERAL FUND ‐ 8,856,000
342 TRANSFER TO CONTINGENCY 301,070 301,070
343 TRANSFER TO PENSION COLA ‐ ‐
344 TRANSFER TO DEPRECIATION RESERVE ‐ 1,250,000
345 TRANSFER FUTURE CAPACITY ‐ ‐
346 RATE STABILIZATION RESERVE ‐ 1,300,000
347 TRANSFER TO SUBTOTAL 301,070 15,207,070
348 CURRENT YEAR BALANCE 738,732 10,947,900
350 TOTALS $ 1,046,978 $ 112,917,770
Page 9
Page 184
Budget Ordinance 2011-10 Attachment
351 2010‐2011 BUDGET ORDINANCES
352 ELECTRIC CONTINGENCY RESERVE FUND
353 CASH RECEIPTS AND EXPENDITURES FOR FISCAL 2010‐2011
354 INFO ONLY
355 2010‐11 2010‐11
356 LATEST EST ADJMTS REVISED
357 CASH RECEIPTS
358 BEGINNING BALANCE $ ‐ $ 1,039,766
359 INTEREST EARNINGS ‐ 31,200
360 TRANSFER FROM INSURANCE STABILIZATION ‐ ‐
361 TRANSFER FROM ELECTRIC REVENUE 301,070 301,070
363 TOTALS 301,070 1,372,036
364
365 EXPENDITURES
366 TRANSFER TO ELECTRIC FUND ‐ 279,640
367 TRANSFER TO RATE STABILIZATION FUND ‐ ‐
368 CARRY FORWARD TO NEXT YEAR 301,070 1,092,396
370 TOTALS $ 301,070 $ 1,372,036
Page 10
Page 185
Budget Ordinance 2011-10 Attachment
371 2010‐2011 BUDGET ORDINANCES
372 ELECTRIC IMPROVEMENT AND EXTENSION FUND
373 CASH RECEIPTS AND EXPENDITURES FOR FISCAL 2010‐2011
374 INFO ONLY
375 2010‐11 2010‐11
376 LATEST EST ADJMTS REVISED
377 CASH RECEIPTS
378 PRIOR YEAR BALANCE $ ‐ $ 3,429,624
379 PRIOR YEAR BALANCE BOND ‐ 415,585
380 INTEREST EARNINGS ‐ 40,700
381 INTEREST TRUSTEE ‐ ‐
382 INCOME FROM SALE OF ASSETS ‐ ‐
383 ELECTRIC NEW SERVICE FEES ‐ ‐
384 RECEIPT FROM DEPRECIATION RESERVE ‐ ‐
385 RECEIPT FROM FUTURE CAPACITY RESERVE ‐ ‐
386 DEMA GRANT ‐ ‐
387 STATE REIMBURSEMENT FOR SR1 &SR9 ‐ ‐
388 STATE REIMBURSEMENT FOR GOVS AVE ‐ 254,757
389 STATE REIMBURSEMENT WYOMING MILL RD 91,000 91,000
390 STATE GRANTS ‐ ‐
391 FEDERAL GRANTS ‐ 135,152
392 INSURANCE CLAIM PROCEEDS ‐ 280,000
393 TRANSFER FROM ELECTRIC ‐ 3,500,000
395 TOTALS 91,000 8,146,818
396
397 EXPENDITURES
398 ELECTRIC GENERATION ‐ 2,106,427
399 TRANSMISSION AND DISTRIBUTION ‐ 739,000
400 ELECTRICAL ENGINEERING 91,000 1,740,295
401 ADMINISTRATION ‐ ‐
402 METER READING ‐ ‐
403 SYSTEMS OPERATIONS ‐ ‐
404 TRANSFER TO DEPRECIATION RESERVE ‐ 1,000,000
405 CURRENT YEAR BALANCE ‐ 2,561,096
406 CURRENT YEAR BALANCE ‐BOND ‐ ‐
408 TOTALS $ 91,000 $ 8,146,818
Page 11
Page 186
Budget Ordinance 2011-10 Attachment
409 2010‐2011 BUDGET ORDINANCES
410 COMMUNITY TRANSPORTATION IMPROVEMENT FUND
411 CASH RECEIPTS AND EXPENDITURES FOR FISCAL 2010‐2011
412 INFO ONLY
413 2010‐11 2010‐11
414 LATEST EST ADJMTS REVISED
415 CASH RECEIPTS
416 PRIOR YEAR BALANCE $ ‐ $ 100,913
417 GRANTS REVENUE ‐ 1,000,000
418 TRANSFER FROM GENERAL 25,000 325,000
419 INTEREST INCOME ‐ 2,800
421 TOTALS 25,000 1,428,713
422
423 EXPENDITURES
424 PROGRAM EXPENSES 25,000 1,325,000
425 OPERATING TRANSFERS OUT ‐ ‐
427 CURRENT YEAR BALANCE ‐ 103,713
429 TOTALS $ 25,000 $ 1,428,713
430
431
432 ADOPTED: *
433
434 ACTIONS HISTORY
435 March 28, 2011 ‐ Proposed Final Reading ‐ Council
436 March 14, 2011 ‐ First Reading ‐ Council
437 February 28,2011 ‐ Presented Latest Estimate to Legislative, Finance and Administration Committee
Page 12