UTILITY COMMITTEE
AGENDA
September 28, 2009 - 5:00 P.M. - Council Chambers - City Hall - City of Dover
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-m ail at Tm cdowell@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Update on Federal Energy Stimulus Funds (Tabled by Committee on 8/10/09)
2. Status Report on Recycling
3. PACE/NAES Monthly Report (July)
4. Adjournment by 5:55 P.M.
/tm
S:\ClerksOffice\PACKETS\2009\Committee\UTILITY\09-28-2009\09-28-2009 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
Memorandum
Office of the City Manager
PO Box 475
Dover, DE 19903
Phone: (302) 736-7005
FAX: (302) 736-7002
E-mail tdeprima@dover.de.us
To: Utility Committee
From: Anthony J. DePrima, AICP, ICMA-CM
City Manager
Date: September 15, 2009
Subject: Status Report on Recycling
1. Status of Dover’s Recycling Program.
As of June 30, 2009, Mr. Koenig’s Department has successfully completed the roll out of
recycling containers to subdivisions in Dover. As of August 31, 2009, there are 7,565
containers in the curbside recycling system. For the month of August 2009, 116.68 tons
of materials were picked up in the curbside recycling program. The tracking reports are
attached for your review.
2. Status of Delaware Legislation
I have done a search of the Delaware Legislature website and I did not finding any
pending legislation in the 145th General Assembly. I did find a Joint Resolution passed by
the House, but not the Senate, that requested the Department of Natural Resources and
Environmental Control, in cooperation with the Delaware Solid Waste Authority and in
conjunction with all interested parties, to enter into discussions leading to a plan with
enabling legislation to be delivered to the Legislature by the first day of session in 2010
and that this plan and legislation must bring the State into compliance with the
Governor’s expressed goal of “Zero Waste” by 2020.
In addition I learned from a DNREC Recycling Program Manager that the DSWA and
DNREC are working on a new Delaware Solid Waste Plan. The person I spoke with did
not know of any recycling legislation plan by the administration, but noted that he did
expect legislation amending and improving the “Bottle Bill”.
Page 3
3. Status of DSWA contract
The DSWA recycling contract expires in February 2010. The DSWA has expressed a
strong desire to continue serving Dover. However, they did inform us that they will not
unilaterally offer a new contract, and will only offer a contract within the context of a
formal Request for Proposal that is open to all possible contractors. Therefore I have
asked Mr. Koenig to prepare a RFP for recycling services. The goal is to have the RFP
on the streets this fall so that we can make a decision before the end of the year. I have
also asked Mr. Koenig to develop a cost analysis for the City operation of the recycling
service in case we want to consider that option.
Page 6
City of Dover
July Monthly Report
Energy and Operations Management
August 20, 2009
This Report was produced by Pace Global Asset Management, LLC (“Pace Global”) and is meant to be read as a whole and in
conjunction with this disclaimer. Any use of this Report other than as a whole and in conjunction with this disclaimer is
forbidden. Any use of this Report outside of its stated purpose without the prior written consent of Pace Global is forbidden.
Except for its stated purpose, this Report may not be copied or distributed in whole or in part without Pace Global’s prior written
consent.
This Report and the information and statements herein are based in whole or in part on information obtained from various sources
as of July, 2009. While Pace Global believes such information to be accurate, it makes no assurances, endorsements or
warranties express or implied, as to the validity, accuracy or completeness of any such information, any conclusions based
thereon, or any methods disclosed in this Report. Pace Global assumes no responsibility for the results of any actions and
inactions taken on the basis of this Report. By a party using, acting or relying on this Report, such party consents and agrees that
Pace Global, its employees, directors, officers, contractors, advisors, members, affiliates, successors and agents shall have no
liability with respect to such use, actions, inactions, or reliance.
This Report does contain some forward-looking opinions. Certain unanticipated factors could cause actual results to differ from
the opinions contained herein. Forward-looking opinions are based on historical and/or current information that relate to future
operations, strategies, financial results or other developments. Some of the unanticipated factors, among others, that could cause
the actual results to differ include regulatory developments, technological changes, competitive conditions, new products, general
economic conditions, changes in tax laws, adequacy of reserves, credit and other risks associated with City of Dover and/or other
third parties, significant changes in interest rates and fluctuations in foreign currency exchange rates.
Further, certain statements, findings and conclusions in this Report are based on Pace Global’s interpretations of various
contracts. Interpretations of these contracts by legal counsel or a jurisdictional body could differ.
over
25 Website: www.paceglobal.com
Washington New York Houston Columbia San Diego London Moscow Mexico City
Page 7
TABLE OF CONTENTS
1.0 - Executive Summary.....................................................................................................................2
2.0 - Budget Report..............................................................................................................................6
2.1 – Variance Report ..................................................................................................................6
2.2 – Variance Analysis...............................................................................................................8
3.0 – Energy Management...................................................................................................................9
3.1 - Purchased Power .................................................................................................................9
3.2 - Generation Management ...................................................................................................12
3.3 - Emissions and Allowance Management............................................................................19
4.0 – Operations Management..........................................................................................................23
Appendices..........................................................................................................................................39
I. PJM Invoice Breakdown....................................................................................................39
II. Load, All In Energy and all in cost of service table ..........................................................40
III. Glossary ........................................................................................................................41
Dover Monthly PGAM Report July 2009 - Final
1
Page 8
1.0 - EXECUTIVE SUMMARY
All In Unit Energy Cost - Actual v Budget
Generation MWh's: Actual v Budget Actual Load vs Budget Load
10,000 $96
100,000
$94
7,500 75,000 $92
$90
MWh MWh 50,000 $ /M W h
5,000 $88
$86
2,500
25,000 $84
$82
0 $80
0 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget Gen Actual Gen Budget Actual Budget ($/MWh) Actual ($/MWh) Budget WA Actual WA
Purchased Power Management
Wholesale load for the month of July was 71,704 MWhs versus a three year historic weather
normalized load of 81,189 MWhs. Hedged transactions accounted for 70,640 MWhs or 98% of this
volume (87% of forecasted load) at a cost of $5.9 million. Spot Market purchases resulted in a PJM
charge of $233 thousand ($266 thousand charge in the Day Ahead market and a $33 thousand credit
in the real time market). Other PJM related charges accounted for an additional $1.4 million cost,
inclusive of all load related fees. July All-In Energy Unit Cost, excluding capacity obligations and
credits was $0.66/MWh favorable compared to the budget for July 2009 of $93.76/MWh. For the
year, projected All-In Energy Unit Cost is $99.49/MWh favorable to budget; based on YTD actual 1
month results and 11 months projected costs.
Generation and Asset Management
For the month of July McKee Run and Van Sant units did not dispatch into the PJM market. A
relatively low average on-peak LMPs for the month demonstrated that the PJM system did not
generally require support from the peaking units. The budget for the month expected approximately
3,500 MWhs of generation.
Emissions and Allowance Management
As shown in Exhibit 1, City of Dover holds 2,691 tons of vintage 2008 SO2 allowances and no tons
of vintage 2008 NOx allowances. Additionally, the City has a balance of 549 tons of vintage 2007
SO2 allowances. At the August 21, 2008 Management Committee meeting the Committee set a
trigger price for the SO2 allowances of $260/ton whereby if the City could achieve this price it
would sell half of its SO2 allowances.
Dover Monthly PGAM Report July 2009 - Final
2
Page 9
Exhibit 1: Emissions and Allowance Summary through July 31, 2009
2008-2009 EMISSIONS & ALLOWANCE SUMMARY
SO2 NOx
Date Action Allowance Sale Revenue1 Allowance Sale Revenue1
Allocation Price Allocation2 Price
Seas. Ann.
1/1/08 Initial 2008 2,723 -- -- 198 -- -- --
Allocation
1/1/08 2007 549 -- -- 0 -- -- --
Carryover
1/1/09 2008 2,691 0
Carryover
1/1/09 Initial 2009 2,723 -- -- 51 76 -- --
Allocation
7/30/09 2009 YTD 1 -- -- 6 12 -- --
Emissions3
Totals
- 2007 Vintage 549 -- -- 0 -- -- --
Allowances
- 2008 Vintage 2,691 -- -- 0 -- -- --
Allowances
- 2009 Vintage 2,722 -- -- 45 64 -- $0
Allowances
$0
$0
Total Revenue $0
Notes:
(1) Revenue calculations account for a $1/ton broker fee for SO2 and a $10/ton broker fee for NOx.
(2) Per the Clean Air Interstate Rule, in 2009, NOx emissions will be governed by a seasonal and annual program.
The NOx seasonal emissions pertain only to emissions (May 1 – Sep 30), similar to the previous trading regimen.
Annual emissions cover the entire year.
(3) The 2009 initial allowance allocation accounts for the reinstatement of CAIR while new SO2 and NOx emissions
rules are completed. These allocations may changes as the rulemaking process continues.
Dover engaged in no allowance transactions during the month of July, and no units dispatched. City
of Dover commenced its new fiscal year and the total net revenue through July 31st from allowance
sales for the 2009-10 fiscal year was $0.
Given current dispatch expectations, the market value of the 2007-2009 Dover allowance inventory
is approximately $515 thousand at the time of this report. This represents 5,962 SO2 allowances
trading at $77.50, 51 Seasonal NOx allowances trading at $150, and Annual NOx trading at $650.
Compliance emissions allowance values continue to remain well below the cost of emission
controls, but some hope exists for a return of market value next year.
Dover Monthly PGAM Report July 2009 - Final
3
Page 10
EMISSIONS & ALLOWANCE SUMMARY
Allowance Allowance Emissions Emissions Allowances Allowances Allowance
Vintage Allocation Month Sold Month Sold Balance
SO2 – 2007 2723 0 98 0 2076 549 1
SO2 – 2008 2723 0 32 0 0 2,691
SO2 – 2009 2723 0 1 0 0 2722
NOx – 2007 198 0 32 0 166 0
NOx – 2008 198 0 20 0 178 0
2
NOx Annu – 2009 76 0 12 0 0 64
NOx Seas – 2009 51 0 6 0 0 45
Operations Management Summary
During the month of July, there were no employee or contractor related OSHA injuries, illnesses,
time loss accidents or near misses. There were zero Environmental Notices of Violations issued
during the month. There were no unit dispatches of any of the McKee Run Units or the VanSant
Unit 11 for PJM.
Monthly Budget Variance - The actual expenses attributable to O&M of the two sites for the month
of July were $562,248. The expenses were $56,831 or 0.98% over the approved budget of $505,417.
The principal reason for the negative variance is due to insurance costs which were budgeted later in
the year but were paid in July. In addition the insurance costs were also higher than budgeted. This
was offset by lower personnel expenses which are attributable to having the first payroll of the
current year accrued in June.
Risk Management Summary
Power demand in the PJM region has been down substantially during the summer as a result of the
sluggish economy and markedly cool weather. This factor has largely offset the impact of rising oil
prices over the past several months, which have recently traded above $70 per barrel. While the
very recent heat wave increased cooling demand and pushed natural gas and power prompt 12-
month prices slightly higher, longer-term gas and power forward prices continued to drift down.
Overall, On-Peak Dover power prices for FY 2010-11 rose slightly (1.5% or $0.80/MWh) while the
FY 2012-13 and FY 2013-14 fell 3.9% ($2.36/MWh) and 5.5% ($3.50/MWh), respectively,
compared with the last reporting period. The reported wholesale Cost-of-Service values in the table
below are reflective of the market movements compared to the prior reporting period:
1
Corrected 2007 SO2 tons emitted to reflect actual emission for Units 3 & 11. December, 2007 report included
emissions for all four units.
2
The NOx Emissions are result from February McKee testing associated with Pollution Remediation project and June
emission testing.
Dover Monthly PGAM Report July 2009 - Final
4
Page 11
Wholesale Cost-of-Service Summary (Projected)
Date
Budget August July June
08/10/2009
Cost- Hedge Ratio Year-to Forecasted
Cost-of Cost-of Cost-of
Power of-
Service w/o w/ Year over
Service Service
Year Service Solar Solar C-O-S 2008-09
$/MWh $/MWh $/MWh
Budget Plant Plant Increase Budget
2009-2010 $93.26 $92.46 89% 89% 2.7% 2.53% $92.41 $92.79
2010-2011 N/A $85.28 85% 86% -7.8% -5.44% $85.17 $85.82
2011-2012 N/A $80.76 74% 76% -5.3% -10.45% $80.87 $82.09
2012-2013 N/A $73.95 56% 59% -8.4% -18.00% $74.97 $76.98
2013-2014 N/A $73.39 18% 20% -0.8% -18.62% $76.31 $79.58
*FY 08/09 Budgeted Cost-of-Service was $90.18/ MWh
Dover Monthly PGAM Report July 2009 - Final
5
Page 12
2.0 - BUDGET REPORT
2.1 – VARIANCE REPORT
Budget Actual Variance
Jul-09 Jul-09 Jul-09
Load Forecast 81,189 71,704 9,485
Power Supply
Power Supply $5,929,094 $5,929,094 $0
Power Supply Management $269,593 $260,275 $9,318
Capacity Charges - Load $1,149,137 $1,154,394 ($5,258)
PJM Charges - Load $1,413,674 $486,701 $926,973
Total - Power Supply $8,761,498 $7,830,464 $931,033
Generation
Plant Operations $505,266 $562,248 ($56,982)
Generation Fuel $293,361 $8,211 $285,150
Capacity Credits ($1,032,361) ($1,032,361) $0
PJM Credits ($434,112) ($5,487) ($428,625)
Total - Generation ($667,846) ($467,389) ($200,458)
Emission Allowance Sales
Total - Emission Allowance Sales $0 $0 $0
Total Power Supply & Generation $8,093,651 $7,363,076 $730,576
Total Power Supply, Generation & Emission
Sales $8,093,651 $7,363,076 $730,576
Unit Costs
Total – Power Supply $107.91 $109.21 ($1.29)
Total - Generation + Emission Sales ($8.23) ($6.52) ($1.71)
Final Cost of Service to City of Dover
Ratepayers $99.69 $102.69 ($3.00)
Dover Monthly PGAM Report July 2009 - Final
6
Page 13
Budget Actual Variance
YTD YTD YTD
Load Forecast 81,189 71,704 9,485
Power Supply
Power Supply $5,929,094 $5,929,094 $0
Power Supply Management $269,593 $260,275 $9,318
Capacity Charges - Load $1,149,137 $1,154,394 ($5,258)
PJM Charges - Load $1,413,674 $486,701 $926,973
Total - Power Supply $8,761,498 $7,830,464 $931,033
Generation
Plant Operations $505,266 $562,248 ($56,982)
Generation Fuel $293,361 $8,211 $285,150
Capacity Credits ($1,032,361) ($1,032,361) $0
PJM Credits ($434,112) ($5,487) ($428,625)
Total - Generation ($667,846) ($467,389) ($200,458)
Emission Allowance Sales
Total - Emission Allowance Sales $0 $0 $0
Total Power Supply & Generation $8,093,651 $7,363,076 $730,576
Total Power Supply, Generation & Emission
Sales $8,093,651 $7,363,076 $730,576
Unit Costs
Total – Power Supply $107.91 $109.21 ($1.29)
Total - Generation + Emission Sales ($8.23) ($6.52) ($1.71)
Final Cost of Service to City of Dover
Ratepayers $99.69 $102.69 ($3.00)
Dover Monthly PGAM Report July 2009 - Final
7
Page 14
2.2 – VARIANCE ANALYSIS
Power Supply
• The Power Supply Management variance is merely an estimate at this point.
• As discussed during the June, 2009 Management Committee, City of Dover’s approved
budget established in April utilized a preliminary PJM Base Residual Auction values. On
June 2nd 2009, PJM announced final Base Residual Auction for current FY that resulted in
increase of $5.25 per MW.day UCAP charge ($196.57). In addition PJM also discovered
and corrected errors to the variables that calculate the current FY UCAP Obligation.
Collectively these charges will result in unfavorable variances each month.
• The PJM Charges for Load experienced a positive $927 thousand variance due to 12%
reduction in demand that displaced the expected Open Position by the same amount; a $227
thousand favorable Basis variance; and an $191 thousand favorable Load Following
variances for the month. Furthermore there was a $94 thousand favorable variance in
transmission costs and a $45 thousand favorable variance in the PJM ancillary charges for
the month. Offsetting these favorable variances were a $26 thousand unfavorable variance in
transmission rights credits and $77 thousand unfavorable variance in the transmission loss
refund.
• For the month a favorable $926 thousand net variance between the Power Supply (fixed
positions) and PJM Charges Load (Open positions and transmission etc) was realized
through a favorable $849 thousand variance caused by the change in volume and a
unfavorable $78 thousand variance caused by the change in price. Hence, 91% of the
variance can be attributed to the change in the volume.
Generations
• Plant O&M resulted in an unfavorable variance of $56 thousand compared to the approved
budget of $505 thousand due to maintenance expenses associated with the insurance costs
that were paid earlier than the budgeted month.
• Generation Fuel realized a favorable variance of $285 thousand for the month due to no
dispatch for the month.
• PJM Credits resulted in $429 thousand unfavorable variance for the month. The budget
expected 3,500MWhs of generation for the month. Neither McKee Run nor Van Sant units
were dispatched into the PJM market.
Dover Monthly PGAM Report July 2009 - Final
8
Page 15
3.0 – ENERGY MANAGEMENT
3.1 - PURCHASED POWER
Management Highlights
• Dover’s July load was 71,704 MWh which was 11.7% below the historic weather
normalized load of 81,189 MWh. Hedge volumes accounted for 98.5% of actual load for
the month.
• The July All In Unit Energy cost excluding capacity of $93.11 is $0.66 per MWh lower
than budget for the month.
Actual Load vs Budget Load
100,000
75,000
MWh 50,000
25,000
0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget Actual
Dover Monthly PGAM Report July 2009 - Final
9
Page 16
All In Unit Energy Cost - Actual v Budget
$96
$94
$92
$90
$/MWh
$88
$86
$84
$82
$80
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget ($/MWh) Actual ($/MWh) Budget WA Actual WA
Dover Monthly PGAM Report July 2009 - Final
10
Page 17
Purchased Power Variance Report
Budget Actual Variance
Jul-09 Jul-09 Jul-09
City of Dover Load
Load Obligation (MWh) 81,189 71,704 9,485
Unit Energy Costs ($ per MWh)
Energy Cost (inc. Load Following & Pace Fees) $87.28 $87.46 ($0.18)
Pass Through $5.22 $4.34 $0.87
Incentive Fees $1.27 $1.31 ($0.04)
Total - All In Unit Energy Cost $93.76 $93.11 $0.66
Purchased Power Variance Analysis
• Actual Dover load of 71,704 MWh was 11.6% below the projected July load of 81,189
MWh.
• The All In Unit Energy Cost resulted in an favorable $0.66 per MWh variance due to lower
than anticipated open position energy costs due to lower demand compared to historical July
demand; a favorable Basis variance; and favorable Load Following variances for the month.
Furthermore there was a favorable variance in transmission costs and PJM ancillary charges
for the month. Offsetting these favorable variances were unfavorable variance in
transmission rights credits and transmission loss refund.
• The Management Incentive fee variance on a $/MWh basis is merely an estimate at this
point.
PJM Power Balancing and Load Related Fees
Purchased Power (Hedges): 70,640 MWh’s @ $83.93/MWh: $5,929,094
Power Balancing and Additional PJM and Energy Manager Fee 3: $1,901,370
Total Cost to Serve Load (71,704 MWh’s) $7,830,464
ALL in $/MWh load cost inclusive of Energy Manager Fees: $109.21/MWh
3
Includes estimated Incentive Fees.
Dover Monthly PGAM Report July 2009 - Final
11
Page 18
3.2 - GENERATION MANAGEMENT
• PJM did not dispatch Dover units into the market - approximately 3,500MWhs of generation
was budgeted for the month.
Generation MWh's: Actual v Budget
10,000
7,500
MWh 5,000
2,500
0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget Gen Actual Gen
Dover Monthly PGAM Report July 2009 - Final
12
Page 19
2009-10 Generation Production Margin v Budget
$500
Thousands
$450
$400
$350
$300
$250
$200
$150
$100
$50
$0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Budget ($) Actual ($)
Dover Monthly PGAM Report July 2009 - Final
13
Page 20
Generation Management Variance Report
Budget Actual Variance
Jul-09 Jul-09 Jul-09
Self-Supplied Capacity from Gen (MW)
McKee Run 1 17 17 0
McKee Run 2 17 17 0
McKee Run 3 100.3 100.3 0
Van Sant 39 39 0
Self Supplied Capacity from Gen (MW) 173.3 173.3 0
Additional Capacity from PJM Incremental
Auction 0 1.7 1.7
Total Capacity from Gen (MW) 173.3 175 1.7
Gen Capacity Sales to PJM ($/MW.d) $191.32 $191.32 0
Incremental Auction Sales to PJM ($/MW.d) $0.00 $86.00 $86.00
Power Sales
Power Sales (MWh) 3,576 0 (3,576)
Sales Revenue ($ per MWh) ($119.87) $0.00 ($119.87)
Power Sales Revenue ($) ($428,708.75) $0.00 ($428,708.75)
Variable Fuel & Transport
Fuel Oil No.2 Volume - McKee (gal) 0 0 0
Fuel Oil No.2 - McKee ($/gal) $0.00 $0.00 $0.00
Fuel Oil No.2 Cost of Goods Sold - McKee ($) $0.00 $0.00 $0.00
Fuel Oil No.2 Volume - VanSant (gal) 0 0 0
Fuel Oil No.6 - VanSant ($/gal) $0.00 $0.00 $0.00
Fuel Oil No.2 Cost of Goods Sold - VanSant ($) $0.00 $0.00 $0.00
Gas Volume (Dth) 46,493 0 46,493
Unit Gas Price ($/Dth) $5.55 $5.55 $0.00
Variable Gas Cost ($) $258,222.35 $0.00 $258,222.35
Transport ($) $27,430.89 $0.00 $27,430.89
Variable Gas and Transport Costs ($) $285,653.24 $0.00 $285,653.24
Variable Fuel & Transport Costs ($) $285,653.24 $0.00 $285,653.24
Testing $0.00 $0.00 $0.00
Generation Production Margin ($143,055.51) $0.00 ($143,055.51)
Generation Capacity Payment
Total - Generation Capacity Payment ($1,032,361) ($1,032,361) $0
Dover Monthly PGAM Report July 2009 - Final
14
Page 21
Generation Management Variance Analysis
Fuel Expense
• PJM did not dispatch Dover units into the market and it did not consume any fuel oil nor spot
natural gas purchase related to the power generation.
Generation Production Margin
Transaction Volumes Revenue/(Cost)
PJM Invoice for Power Sold 0 MWh’s $0
Fuel and Transport 0 dth gas/0 gal #6 oil $0
0 gal #2 oil
Generation Production Margin 0 MWh’s $0
The following non-production energy revenues and costs are generally fixed and not directly related
to generation dispatch and power production.
PJM Invoice (Black Start) $5,487
Fuel Oil Tank Heating & Black Start Gas Supply $0
Eastern Shore Demand Charge ($4,489)
Eastern Shore Transport and Imbalance Charge $0
Transco Demand Charge ($3,722)
Non-Production Energy Revenue/Costs ($2,724)
Dover Monthly PGAM Report July 2009 - Final
15
Page 22
Fuel and Transportation
Date Volume (Dth) Price ($/Dth) Total Commodity
Cost ($)
Hess Corp
Sub-Total 0 $0.00 $0.00
PESCO
Sub-Total 0 $0.00 $0.00
NJNG
Sub-Total 0 $0.00 $0.00
Total 0 $0.00 $0.00
Do to the conversion from #6 residual oil to Low sulfur #2 oil the need for a constant supply of
natural gas to heat the #6 fuel is no longer required. Some gas will still be required for winter
heating of the building(s). Pace will still coordinate with NAES on the procurement of supply.
However, this expense will now fall under the plant utility costs and be paid and budgeted for by the
station.
Dover Monthly PGAM Report July 2009 - Final
16
Page 23
Gas Transportation Purchased
Eastern Shore Natural Gas Pipeline and TransCo agreements provide for deliveries to the McKee
Run and VanSant stations. These charges include a firm demand charge and adjustments as follows:
ESNG FT Demand Charge $4,489
TransCo FT Demand Charge $3,722
Total Purchases $8,211
Other Gas Purchases
Commodity and transportation imbalances on Eastern Shore Pipeline for the month resulted in no
charge and it is summarized as follows.
Eastern Shore Transport and Imbalance Charges
Imbalance/dth Estimated Cost/dth Estimated Total Cost
0 $0.00 $0.00
$0.00
Transport Volume/dth $/dth Total Cost
Firm/IT 0 $0.00 $0.00
Net Charge $0.00
Dover Monthly PGAM Report July 2009 - Final
17
Page 24
Purchased Commodity Fuel Oil Summary
Neither McKee Run units nor Van Sant were dispatched into PJM and no fuel oil #2 was consumed
for the month.
McKee Run tank will maintain 3 days of load equivalent dispatches for McKee Run Units. At
current fuel market prices, Pace and NAES are considering purchasing ultra low #2 fuel oil
inventory when it is a prudent purchase timing.
Tank Inventory Estimates as of July 31
Tank Tank Capacity Inventory In Days of Burn
(gallon) (gallon) (Typical Dispatch 4)
McKee Run (#2 Fuel 2,554,105 337,519 3
Oil)
VanSant 258,000 94,557 3
(#2 Fuel Oil)
4
As measured by tank level instruments. Tank levels may change due to oil temperature.
Dover Monthly PGAM Report July 2009 - Final
18
Page 25
3.3 - EMISSIONS AND ALLOWANCE MANAGEMENT
As shown in Exhibit 1, City of Dover holds 2,691 tons of vintage 2008 SO2 allowances and no tons
of vintage 2008 NOx allowances. Additionally, the City has a balance of 549 tons of vintage 2007
SO2 allowances. At the August 21, 2008 Management Committee meeting the Committee set a
trigger price for the SO2 allowances of $260/ton whereby if the City could achieve this price it
would sell half of its SO2 allowances.
Exhibit 1: Emissions and Allowance Summary through July 31, 2009
2008-2009 EMISSIONS & ALLOWANCE SUMMARY
SO2 NOx
Date Action Allowance Sale Revenue1 Allowance Sale Revenue1
Allocation Price Allocation2 Price
Seas. Ann.
1/1/08 Initial 2008 2,723 -- -- 198 -- -- --
Allocation
1/1/08 2007 549 -- -- 0 -- -- --
Carryover
1/1/09 2008 2,691 0
Carryover
1/1/09 Initial 2009 2,723 -- -- 51 76 -- --
Allocation
7/30/09 2009 YTD 1 -- -- 6 12 -- --
Emissions3
Totals
- 2007 Vintage 549 -- -- 0 -- -- --
Allowances
- 2008 Vintage 2,691 -- -- 0 -- -- --
Allowances
- 2009 Vintage 2,722 -- -- 45 64 -- $0
Allowances
$0
$0
Total Revenue $0
Notes:
(1) Revenue calculations account for a $1/ton broker fee for SO2 and a $10/ton broker fee for NOx.
(2) Per the Clean Air Interstate Rule, in 2009, NOx emissions will be governed by a seasonal and annual program.
The NOx seasonal emissions pertain only to emissions (May 1 – Sep 30), similar to the previous trading regimen.
Annual emissions cover the entire year.
(3) The 2009 initial allowance allocation accounts for the reinstatement of CAIR while new SO2 and NOx emissions
rules are completed. These allocations may changes as the rulemaking process continues.
Dover engaged in no allowance transactions during the month of July, and no units dispatched. City
of Dover commenced its new fiscal year and the total net revenue through July 31st from allowance
sales for the 2009-10 fiscal year was $0.
Given current dispatch expectations, the market value of the 2007-2009 Dover allowance inventory
is approximately $515 thousand at the time of this report. This represents 5,962 SO2 allowances
trading at $77.50, 51 Seasonal NOx allowances trading at $150, and Annual NOx trading at $650.
Dover Monthly PGAM Report July 2009 - Final
19
Page 26
Compliance emissions allowance values continue to remain well below the cost of emission
controls, but some hope exists for a return of market value next year.
SO2
The SO2 allowance market remains supportive of prices in the $60-$80/ton range, with the most
recent closing price at $77.50/ton. SO2 market prices are down for a number of reasons. In the wake
of the initial CAIR rule promulgation, pre-2010 banked SO2 allowance prices spiked anticipating
lower compliance values for allowances issued in 2010 or later. The DC Circuit remanded the
rulemaking back to the EPA with the instruction that lessening the value of SO2 allowances
established under the Clean Air Act was outside the scope of the EPA’s rulemaking authority. Thus,
prior to CAIR re-promulgation, the market generally is seeing less of a premium on banked SO2
allowances.
The slowed economy and lower power production for 2009 appears to be lessoning the demand for
SO2 allowances as total emissions among covered entities will be significantly down compared to
2007 and 2008 (see Table 1). Through the first 6 months of 2007, SO2 emissions were
approximately 4,445,372 tons for covered units. Through the first 6 months of 2008, SO2 emissions
were approximately 3,939,906 tons for covered units. Through the first 6 months of 2009, SO2
emissions are only 2,546,000 – a significant drop from the previous two years. This emissions data,
among other factors, calls into question whether there will be a December true-up spike in SO2
prices, as we have seen in the past. It is possible, that a December drop in prices will result from the
lower emission levels of 2009. However, trades in the $85/ton range for Dec 09 delivery have been
noted. Overall expectations are that SO2 trading volume will continue to be thin with a generally
backwardated forward price curve as market participates await the repromulgation of CAIR. Again
there is a sense among many of the market participants that the pre-2010 banked premium is
unlikely to reappear.
NOx
The steady decline of annual NOx allowance values continued from approximately $1,100/ton down
to $650/ton over the past month. Seasonal NOx allowance value also continued declining, moving
from $250/ton down to $150/ton in thin trading.
NOx prices, both annual and seasonal, are also down for a number of reasons. For starters, many
recent NOx emission control installations (SCR, SNCR, low-NOx burners, etc.) put in place
anticipating CAIR implementation (or a regime at least as strict from EPA’s upcoming new rule) are
reported to be performing better than expected. Annual NOx emission prices have been further
dampened in part due to State allocation of early action allowance pools under CAIR. Additionally,
some states (VA for example) are beginning to redistribute to existing sources a number of annual
NOx allowances set-aside for early action credit or new entrants. Annual prices have been still
further depressed as a result of the EPA Compliance Supplemental Pool, which distributed an
additional 200,000 Annual NOx allowances, which must be used this year, further depressing
expectations of a 2009 true-up price spike.
As with SO2 emissions, NOx emissions are way down this year when compared to 2007 and 2008
emissions data. NOx emissions for covered units for the first 6 months of 2007 and 2008 were
Dover Monthly PGAM Report July 2009 - Final
20
Page 27
approximately 1,712,000 and 1,622,000 tons respectively. NOx emissions for the first 6 months of
2009 were 984,000 tons. A slower economy with lower energy demand, gas prices at recent
historical lows, gas storage at historical highs, and generally lower dispatch of NOx intensive units
has contributed to lower NOx emissions levels for 2009 thus far. The NOx forward price curve is
also backwardated as market participants await CAIR promulgation.
Table 1
January - June Emissions
00
0 ,0
50 0
4 , ,0 0
0
, 00 00
4 ,0
0
50 0
3 , ,0 0
0
Tons 00 0
3 , ,0 0
0
, 50 00
2 ,0
0
00 0
2 , ,0 0
0
50 0
1 , ,0 0
0
, 00 00
1 ,0
0
50 0 2007 2008 2009
SO2 Nox
SOx and NOx Outlook
Hopes for a return of regulatory certainty in the emissions markets have been flat of recent. Senator
Carper announced intention to introduce a three pollutant bill to add to carbon legislation after the
August Recess. It is safe to say that politically Carpers push currently lacks legs and is not likely to
garner relevant attention in Congress anytime soon. His intended link to carbon legislation may be
broken if an energy bill only track is created in the Senate. Overall, legislative action to affirm CAIR
and / or establish new requirements for SOx, NOx, and Hg is looking unlikely for the near future.
Regarding, CAIR repromulgation EPA indicated that it plans to issue a draft of the new Clean Air
Interstate Rule (CAIR) in early 2010; we expect it sometime in Q2 2010. Regulatory intelligence
currently indicates that emissions trading system will be used similar to CAIR structures.
Overall, the emissions markets are trading very thin and will likely continue to do so till the
uncertainty lifts with market fundamentals clarifying in regulation. In addition to the control
investments and orders made prior to the CAIR vacatur, this recent uncertainty has driven many
Dover Monthly PGAM Report July 2009 - Final
21
Page 28
compliance entities to look towards emission control installations as a firm risk management
mechanism.
Pace continues to closely monitor the NOx and SO2 markets and will provide Dover with
assessments of allowance allocations, liquidity, and value as information becomes available.
RGGI and Federal Carbon Outlook
RGGI market prices are currently floating around $2.95/ton. Maintaining open interest between
$2.75 and $4.00, the RGGI market has seen a lot of movement in its early stages, so no clear long-
term price signals are yet evident. Based on projected generation and emissions Dover is projected to
have an excess of 70,000 allowances through 2013 with a market value at current prices of
$206,500.
The main buoy of RGGI pricing currently is not market fundamentals as the market is expected to
remain over-allocated / long into 2010. Rather, the conversion potential of RGGI allowances into
Federal allowance volume in a national carbon market is the main support for RGGI pricing. While
the reality of RGGI compliance for covered units exists, for many compliance is little more than
“noise in the system” and opportunities to monetize or covert to federal and then monetize RGGI
volume are being hunted. The “coastal” Democratic leadership behind the Waxman / Markey bill
ensured that RGGI allowance conversion would take place – continuing the drive of federal market
speculation into RGGI. Indeed, Waxman / Markey established the ratio for conversion based on the
average RGGI auction clearing price as opposed to the actual “cost of obtaining and holding the
allowance” thereby functionally allowing Dover to lift its cost basis on free allowance allocation up
from zero for federal conversion. Thus, currently the value of RGGI allowances in the bank should
be valued with consideration of potential conversion should a federal system be enacted, in addition
to their higher regional value in a non-overallocated RGGI future.
Dover Monthly PGAM Report July 2009 - Final
22
Page 29
4.0 – OPERATIONS MANAGEMENT
Management Highlights
• During the month of July, there were no restricted work days or lost time accidents. The
facility has now gone 185 days without an OSHA recordable accident and 1,578 consecutive
days without a lost time reportable accident. There were no Near Miss events during the
month. The plant received no Notice of Violations (NOVs) or other permit deviations during
the month.
• During the month, there were no unit dispatches of any of the McKee Run units or Unit #11
at VanSant. All units at McKee Run were available for the month of July.
• The plant received the final report from Lewellyn Technology (LT) who performed an Arc
Flash Analysis of both generating facilities. The plant has evaluated the recommendations
and is now in the process of developing an action plan to implement the recommendations
and to use the findings from the report to implement new procedures for safety.
• Ariva vibration report indicated excessive vibration on tower fan three. Ariva report also
indicated abnormal results in the unit 1&2 tower fan gearboxes. Maintenance team addressed
these issues.
• The Capital Improvement Projects for the 2009-2010 physical year have been approved.
• A Capital Improvement Project has been developed for cooling tower repairs and
improvement to extend the lives of the cooling towers.
• Final revisions are being made to the Appendix E reports from the emissions testing which
occurred in June 2009.
• NAES Scholarship awards were presented for the month.
• The following is the NAES Monthly Report as submitted to PGAM
Dover Monthly PGAM Report July 2009 - Final
23
Page 30
NAES Corporation
Dover, Delaware
July 2009 Monthly Report
NAES Scholarship Awards were presented to Dave Hodge’s daughter
Mariah and Phil Marvel’s daughters Kelly and Katie.
Dover Monthly PGAM Report July 2009 - Final
24
Page 31
Table of Contents
1.0 Environmental, Health and Safety
2.0 Financial
3.0 Operations
4.0 Maintenance
5.0 CIP
6.0 General Plant Information
7.0 Summary of NAES Performance
Dover Monthly PGAM Report July 2009 - Final
25
Page 32
1.0 Environmental, Health and Safety:
During the month of July, there were no restricted work days or lost time accidents. The facility has
now gone 185 days without an OSHA recordable accident and 1,578 consecutive days without a lost
time reportable accident.
There were no Near Miss events during the month. The plant received no Notice of Violations
(NOVs) or other permit deviations during the month.
Environmental, Health and Safety Statistics
Month Fiscal Year to Date
(July 2009) (7/1/09-6/30/10)
NOVs 0 0
Opacity Deviations 0 9
Environmental Deviations 0 1
OSHA Recordable 0 1
OSHA LTA's 0 0
First Aid cases 0 0
Restricted Workday Accident 0 1
Near Miss 0 10
Man Hours Worked 5,123.5 5,123.5
Date last OSHA Recordable 1/27/09
Date last Lost Time Accident 4/05/05
Days since last OSHA recordable 185
Days since last Lost Time Accident 1,578
Emissions (NOx & SO2) All data thru 7/31/09
NOx Summary - Year (May-Sept.)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2008 1.01 0.96 17.0 1.28 20.25
2009 0.9 0.7 3.1 0.5 5.2
2010 0.0 0.0 0.0 0.0 0.0
NOx Summary - Year (Jan-Dec)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2009 0.9 0.7 9.0 0.5 11.1
2010 0.0 0.0 0.0 0.0 0.0
2011 0.0 0.0 0.0 0.0 0.0
Dover Monthly PGAM Report July 2009 - Final
26
Page 33
SO2 Summary - Year (Jan.-Dec.)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2007 6.28 5.31 97.69 0.28 109.56
2008 0.011 0.009 31.0 0.6 31.6
2009 0.0 0.0 0.1 0.2 0.3
Note: *Denoted data is as of 7/31/2009
SO2 Allowances Summary
SO2 Allowances
SO2 Available Total SO2 SO2
Allowances (Per Unit, Prior to Tons Allowances
SO2 Allowance
Sold - YTD Sale & Emitted – Balance
Vintage
Reconciliation) U3 and U11
Unit #3 Unit #11 YTD
2007 2076 2585 138 98 549
2008 0 2585 138 32 2691
2009 0 2585 138 0 2723
Note: Denoted data is as of 7/31/2009
NOx Allowances Summary
NOx Allowances
NOx Available Total NOx NOx
NOx Allowance Allowances (Per Facility, Prior to Tons Allowances
Vintage Sold - YTD Sale) Emitted Balance
(NOx Season)
Unit #3 Unit #11
2007 165 191 7 33 0
2008 178 191 7 20 0
2009 0 191 7 6 192
2010 0 191 7 0 198
Note: NOx Season is May 1 to September 30.
CAIR NOx Allowances Summary*
CAIR CAIR NOx NOx Allowances Available Total NOx Allowance Balance
NOx Allowances (Per Facility, Prior to Sale) NOx Tons
Allowance Sold YTD Emitted
McKee VanSant McKee Run VanSant
Vintage
Run (Yr/Season) (Yr/ (Yr/Season) (Yr/Season)
Season)
(Yr/Season)
2009 0 71/48 5/3 12/6 60/43 4/2
2010 0 71/46 5/3 0 71/46 5/3
Note *– CAIR legislation is pending revision
Dover Monthly PGAM Report July 2009 - Final
27
Page 34
CO2 Allowances Summary*
CO2 CO2 CO2 Allowances Available Total CO2 CO2
Allowance Allowances (Per Facility, Prior to Sale) Tons Emitted Allowance
Vintage Sold YTD Balance
McKee VanSant
Run
2009 0 55,132 1,699 5,019 53,851
2010 0 47,844 1,636 0 49,480
2011 0 35,883 1,227 0 37,110
2012 0 23,922 818 0 24,740
2013 0 11,961 409 0 12,370
Note: All CO2 allowance values are provided by the RGGI CO2 Allowance Tracking System.
Dover Monthly PGAM Report July 2009 - Final
28
Page 35
2.0 Financial
Financial – Current Month
Month – July 2009
Actual Budget Variance
Personnel 199,279 355,389 156,110
Materials & Supplies 2,681 25,875 23,194
Administrative Expenses 360,288 124,153 (236,135)
Total $562,248 $505,417 ($56,831)
Financial – Fiscal Year to Date
Number of Months – 1
Actual Budget Variance
Personnel 199,279 355,389 156,110
Materials & Supplies 2,681 25,875 23,194
Administrative Expenses 360,288 124,153 (236,135)
Total $562,248 $505,417 ($56,831)
2.1 Variance analysis:
The original budget for July was $505,417. The actual expenses for July are $562,248 for an
unfavorable variance of $56,831 or 0.98%. The variance was due to the following:
PERSONNEL EXPENSES - Labor, overtime, and burdens accounted for a favorable variance
of $156,110. The first payroll of the current fiscal year accrued in the last fiscal year.
MATERIALS AND SUPPLIES EXPENSES- A favorable variance of $23,194 was due to some of
these costs being accrued into June of 2009.
ADMINISTRATIVE EXPENSES - An unfavorable variance of $236,135 was due to insurance
costs that were considerably higher than anticipated and budgeted later in the fiscal year.
The current forecast is to finish this fiscal year at $5,883,743 expensed versus $5,798,711 budgeted
putting us at 101.5%. This should change once we make the adjustments to the forecast, specifically
in the insurance account.
Dover Monthly PGAM Report July 2009 - Final
29
Page 36
3.0 Operations
Unit Operations / Outages / Trips
During the month, there were no units dispatched at McKee Run or Unit #11 at VanSant.
Month – July 2009
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0.00 0.00 0.00 0.00 0.00 0.00
Starts # 0 0 0 0 0 0
Gross Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Net Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Total Auxiliaries MWh 20.914 20.914 149.667 191.495 946 192.441
Auxiliaries purchased MWh 20.914 20.914 149.667 191.495 946 192.441
Fuel Gas Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 0.0 0.0
Total Fuel MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Net Heat Rate BTU/KWh 0.0 0.0 0.0 0.0 0.0 0.0
Unit Trips # 0 0 0 0 0 0
Capacity Factor % 0.0 0.0 0.0 0.0 0.0 0.0
Availability Factor % 100.00 100.00 100.00 100.00 100.00 100.00
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage 0 0
Hours 0 0 0 0
Hours
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0 0 0 0 0 0
Reserve Shutdown
Hours 744.000 744.000 744.000 744.000 744.000 744.000
Hours
HW Boiler Gas Usage MMBTU 0 0
Pilot Gas Usage MMBTU 0 0 0 0
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from fuel flow instruments
Dover Monthly PGAM Report July 2009 - Final
30
Page 37
2009-2010 Fiscal Year-to-Date (1 Month)
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0.0 0.0 0.0 0.0 0.0 0.0
Starts # 0.0 0.0 0.0 0.0 0.0 0.0
Gross Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Net Generation MWh 0.0 0.0 0.0 0.0 0.0 0.0
Total Auxiliaries MWh 20.914 20.914 149.667 191.495 .946 192.441
Auxiliaries purchased MWh 20.914 20.914 149.667 191.495 .946 192.441
Fuel Gas Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 0.0 0.0
Total Fuel MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Net Heat Rate BTU/KWh 0.0 0.0 0.0 0.0 0.0 0.0
Unit Trips # 0 0 0 0 0 0
Capacity Factor % 0.0 0.0 0.0 0.0 0.0 0.0
Availability Factor % 100.00 100.00 100.00 100.00 100.00 100.00
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 0 0 0 0 0 0
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0 0 0 0 0 0
Reserve Shutdown Hours Hours 744.000 744.000 744.000 744.000 744.000 744.000
HW Boiler Gas Usage MMBTU 0 0
Pilot Gas Usage MMBTU 0 0 0 0
VanSant Lifetime through 7/31/09
Actual Starts Factored Starts Fired Hours
VanSant 1193 2011.75 3,934.2
Since HGP - Dec 2004 144 344.05 550.578
Fuel Oil Inventory
Monthly Monthly Fuel Monthly FY 09-10 Fuel FY 09-10
Inventory Inventory Purchases Inventory Inventory Purchases Inventory
(Start) (End) (Month) (Change) (Start) (YTD) (Change)
McKee Run
(#2 Fuel Oil) 337,519 337,519 0 0 337,519 0 0
VanSant
94.388 94.557 0 114 94,388 0 114
(#2 Fuel Oil)
Note: As measured by tank level instruments. Tank levels may change due to oil temperature.
Dover Monthly PGAM Report July 2009 - Final
31
Page 38
Capacity Testing – FY 2009-2010
Summer 2009 (June 1- Aug 31) Winter 2009-2010 (Dec 1- Mar 1)
Unit Rated Net Reported Net Unit Rated Net Reported Net
Capability (MW) Capability (MW) Capability (MW) Capability (MW)
1 17 17.24 1 17 17.3*
2 17 17.59 2 17 17.9*
3 102 102.00 3 102 102.3*
VanSant 39 40.30 11 40 40*
Total 175 177.13 Total 176 177.50
Note: * depicts a unit that has not completed capacity test for the PJM Demonstration Period in FY 2009-
2010.
Team Report:
Operations completed project on #1, #2, & #3 fuel oil burner pump rooms by removing insulation,
lagging, and unused heat tracing. After all the insulation was removed all the oil lines were painted
with epoxy paint. To finish the project teams labeled all the piping with directional flow labels on all
the oil piping.
Operations completed a similar project in epoxy painting the oil piping on all three burner decks and
new fuel oil regulating stations from the oil conversion project on #3 unit and labeled oil piping with
directional flow labels.
A study group is being formed to help operators pass the PJM Dispatcher Certification exam. The
study group will be lead by an Operations Supervisor and will concentrate on areas that need to be
focused on like Emergency Procedures or other areas the operators are weak on.
Teams continued training within the Plant Readiness Program (PRP) to keep their skills and
knowledge of the plant up to date particularly when the generating units are off line or when they are
not supporting maintenance activities. The GPI online training which supports our safety and
environmental training are being used by the teams to complete their training. GPI also has a number
of courses that are used to support operator advancement and refresher training.
Dover Monthly PGAM Report July 2009 - Final
32
Page 39
4.0 Maintenance
During the month of July, plant maintenance staff continued addressing the backlog of work orders.
Sixty-eight work orders were issued during the month, with sixty-eight work orders being completed
during the month.
The table below summarizes the monthly work order activities.
Work Order Report
July - 09
Outstanding
From Outstanding
Previous Issued This Completed at the end of
Priority # Months Month This Month the month
P1 0 0 0 0
P2 0 3 3 0
P3 9 21 23 7
P4 26 23 19 30
P5 20 1 0 21
P6 0 0 0 0
P7 8 0 2 6
P8 13 0 0 13
P9 13 6 2 17
P6 - 1 0 0 0 0
P6 - 2 0 0 0 0
P6 - 3 0 2 2 0
P6 – 4 0 0 0 0
P6 – 5 0 0 0 0
P6 – 6 0 0 0 0
P6 – 7 0 0 0 0
P6 - 8 0 0 0 0
PM 22 12 17 17
Totals 111 68 68 111
Note: PM's are included in the priority totals
Notable activities during the month include:
1) Ariva vibration report indicated excessive vibration on tower fan three. Maintenance team
inspected tower fan and found two damaged fan blades. Both fan blades were replaced and the
fan test run for vibration. Fan tested OK.
2) Ariva report indicated abnormal results in the unit 1&2 tower fan gearboxes. Maintenance
staff changed the tower fan gearbox oil in all ten fans.
3) XL Insurance Company suggested a cathodic protection inspection be performed at VanSant
for all below ground oil piping. Inspection of the oil piping and the integrity of the piping metal
were reported to the plant staff. Lightening arrestors were placed on all exposed oil piping
flanges resulting in added protection of the oil system piping.
Dover Monthly PGAM Report July 2009 - Final
33
Page 40
4) Jersey IC completed a thermography survey while each unit was in operation during our June
testing. A detailed report was received by the plant staff. Maintenance staff completed three
action items from the thermography report. Hotspots were found on 3B vacuum pump lead
wires, 3B vacuum pump breaker and VanSant’s “A” exhaust frame blower lead wire. Each item
was inspected, cleaned and retighten or replace hardware per the report.
5) Radius completed our quarterly fire protection inspection at each cooling tower. Fire
protection systems were manually tested. Both fire alarm bells would not sound off and one
remote alarm to the control room wasn’t working. Two safety work orders were written as a
result of the inspection. Both safety work orders were completed within two days of the
inspection.
Dover Monthly PGAM Report July 2009 - Final
34
Page 41
5.0 Capital Improvement Projects (CIP)
Project Description Update
Number
EG0801 MR Fire Protection Progress: Project deferred to 2009 to investigate an
System Upgrades alternative technical approach. XL Insurance is assisting in
this endeavor.
Schedule: Installation now projected to be October 2009.
EG0804 MR Pollution Progress: Change out of fuel oil equipment has been
Remediation completed. Units 1, 2 and 3 have successfully made the
Equipment conversion and successfully completed a Winter Period
Capacity Test. Schedule: Additional testing & tuning needed
to optimize Unit 3 operation will be done as opportunities
arise with dispatch by PJM. Final reports from the emissions
testing for DNREC that occurred in June have been received
but had errors in the report and we are working with the
testing company to resolve.
EG0904 MR & VS Arc Flash Progress: Phase One of the project is complete and a final
Analysis report was received. The report findings are being reviewed
to determine scope for phase two.
Schedule: Task statement(s) will be developed as necessary
for implementation of action items from report.
EG1001 VanSant Mark IV Progress: Task statement and work scope is being developed
Controls Upgrade for distribution in early September. Schedule: Send out for
bids in early September. Evaluation of bids and selection of
vendor in October 2009. Engineering, design and
procurement to follow with installation and testing of system
in addition to operational testing of the system in May 2010.
McKee Run Plant Progress: Task statement and work scope is being developed
Paving for distribution in late 2009. Schedule: Send out for bids,
EG1002
evaluation of bids and selection of vendor for a Spring 2010
completion.
Miscellaneous Progress: This project is for the unexpected needs that may
Capital Equipment occur during a budget year that were unexpected due to
EG1003 Replacements equipment failure for example. Schedule: The funding is in
place and there are no capital items identified at this time to
go into this project fund.
Mckee Run Progress: A task statement has been developed and needs to
Warehouse & be finalized. A RFP will be then be advertised in late August
EG1004 Administration 2009. Schedule: After some planning the work should take
Building Fire place in early 2010.
Protection
Dover Monthly PGAM Report July 2009 - Final
35
Page 42
5.1 CIP Budget
Original Latest
Project Budget Estimate
Description
Number
($ X 1000) ($ X 1000)
MR Fire Protection System
EG0801 50 50
Upgrades
MR Pollution Remediation
EG0804 3800 3200**
Equipment
MR & VS Arc Flash Analysis Phase
EG0904 125 75*
II
EG1001 VanSant Mark IV Controls Upgrade 700 700
EG1002 Mckee Run Plant Paving 240 240
Miscellaneous Capital Equipment
EG1003 51 51
Replacements
Mckee Run Warehouse &
EG1004 Administration Building Fire Protection
55 55
* $50K removed and put into O&M budget. The remaining $75K was put into the 2010 O&M
budget
**Includes latest projection for fuel usage for testing
Dover Monthly PGAM Report July 2009 - Final
36
Page 43
6.0 General Plant Information
Training
The plant had training on our updated Facility Response Plan. The training went over scenarios of
having an oil spill getting to one of our outfalls and making it to the lake. From the training
personnel came up with some ideas how to improve our reaction time. We purchased some plugs for
the outfalls so we could stop any oil or chemical by plugging the outfall so there would be no or
minimal contamination in the lake.
Plant staff continues to train with the GPI online training for completing the OSHA and
environmental training requirements for the year. Plant staff have also continued to review the
Plant SMPs (Safety Manual Procedures) for 2009.
Plant personnel continue to train using the EDQP program. This program is used for developing the
employee for the next level at their position or we use it for a refresher course for the plant personnel
that are at a senior position so they can review plant systems.
Topics discussed during the monthly safety committee meeting were reviewed by the entire staff.
Other Events
The plant received the final report from Lewellyn Technology (LT) who performed an Arc Flash
Analysis of both generating facilities. The plant has evaluated the recommendations and is now in
the process of developing an action plan to implement the recommendations and to use the findings
from the report to implement new procedures for safety. Labeling of electrical panels has been
completed indicating arc flash hazards. In addition, training is being scheduled for plant personnel to
provide greater understanding of arc flash exposure and personnel safety.
A Capital Improvement Project has been developed for cooling tower repairs and improvement to
extend the lives of the cooling towers. This plan prioritizes work that needs to be completed by the
inspection report that was supplied by SPIG on #3 unit cooling tower. On a parallel path, the plant
has received a budgetary quote for a tower replacement. This information will be provided to Pace
Global who will assist in determining which option to pursue.
NAES Scholarship awards were presented to Mariah, daughter of Senior Operator Dave Hodge and
Katie and Kelly Marvel, daughters of Phil Marvel, Maintenance Supervisor. Mariah is a first time
recipient and will be a freshman at the University of Pennsylvania studying psychology. Katie and
Kelly are recipients for the third consecutive year. They both attend Liberty University and will be
juniors, both majoring in communications.
The Capital Improvement Projects for the 2009-2010 physical year have been approved. These
projects include a Mark IV controls upgrade at VanSant, paving the roads at the McKee Run
Generating Station, Miscellaneous Capital Equipment Replacements, and the installation of a Heat
and Smoke Detection for the McKee Run warehouses and administration building.
Final revisions are being made to the Appendix E reports from the emissions testing which occurred
in June 2009. Catalyst is in the process of revising the reports as well as providing the plant with the
Dover Monthly PGAM Report July 2009 - Final
37
Page 44
Particulate Testing test results. These reports will be submitted to the EPA and DNREC after a
thorough review by the plant with assistance from Monica Lopes, NAES ESS.
The plant FRP has been updated as well as the plant-wide training of all plant staff. In addition, table
top drills were utilized to aid in preparing plant personnel for a possible spill drill that the EPA had
scheduled for the Dover area.
Calendar of Events
Date
Toxic Release Inventory (TRI) Due July 1, 2009
Fiscal Year 2009-2010 Begins July 1, 2009
EIA Reporting Requirements EIA-860 Report July 15, 2009
McKee Run and VanSant Title V Semi-Annual Certification Due August 1, 2009
NOx Ozone Season Ends September 30, 2009
Winter Capacity Period December 1, 2009 to February 28,
2010
#1 Unit Annual Inspection October 5 to October 11, 2009
#2 Unit Annual Inspection October 12 to October 18, 2009
One Year Accident Free Target January 27, 2010
McKee Run and VanSant Title V Annual Certification Due February 1, 2010
#3 Unit Annual Inspection March 9 to May 3, 2010
NOx Ozone Season Starts May 1, 2010
Fiscal Year 2009-20010 Ends June 30, 2010
7.0 Summary of NAES Performance to Date
Plant Performance FY 2009-2010
Measure Month Year to Date YTD FY Maximum
Incentive Incentive
Commercial
Unavailability (CU) 0% 0% $88,611 $88,611
Safety 0 0 $16,614 $16,614
Environmental 0 0 $16,614 $16,614
Capacity Tests
Summer Winter Summer Winter
Completed
Unit 1 No No Yes * No $1,662 $3,323
Unit 2 No No Yes * No $1,662 $3,323
Unit 3 No No Yes * No $9,969 $19,938
Unit 11 No No Yes * No $3,323 $6,646
Total YTD Total YTD
89.29% $138,454 $155,069
Incentive % Incentive
Note: * depicts a unit that has completed capacity test during the Summer PJM Demonstration Period which includes the
months from June 1 to August 31.
Dover Monthly PGAM Report July 2009 - Final
38
Page 45
APPENDICES
I. PJM INVOICE BREAKDOWN
The PJM bill is a record of all Electricity Transactions, Transmission Services, Ancillary Services and Miscellaneous
fees that allow the PJM to operate. Below is a list of the line items on the PJM bill including all generator activity.
PJM Bill Line Items Gen Load Net
Day Ahead Energy $0.00 ($266,887.27) ($266,887.27)
Realtime Energy $0.00 $33,441.09 $33,441.09
Transmission Losses Credits $0.00 $58,179.26 $58,179.26
Network Integration Transmission Service Charges $0.00 ($216,216.94) ($216,216.94)
Inadvertent Interchange Charges $0.00 ($1,616.92) ($1,616.92)
Regulation Charges $0.00 ($24,460.45) ($24,460.45)
Synchronized Reserve Charges $0.00 ($3,146.94) ($3,146.94)
Balancing Operating Reserves Charges $0.00 ($5,239.48) ($5,239.48)
Day Ahead Operating Reserves Charges $0.00 ($8,794.57) ($8,794.57)
Day-ahead Scheduling Reserve $0.00 ($199.98) ($199.98)
Synchronous Condensing Charges $0.00 ($45.55) ($45.55)
Reactive Services Charges $0.00 ($20,832.58) ($20,832.58)
Meter Correction Charges $0.00 ($11.78) ($11.78)
Day-ahead Economic Load Response Program Charges $0.00 $0.00 $0.00
Real-time Economic Load Response Program Charges $0.00 $0.00 $0.00
Balancing Operating Reserves Credits $0.00 $0.00 $0.00
Day Ahead Operating Reserves Credits $0.00 $0.00 $0.00
Locational Reliability Charges $0.00 ($1,171,202.92) ($1,171,202.92)
Capacity Transfer Rights Credits $0.00 $16,801.07 $16,801.07
Capacity Resource Deficiency Credits $0.00 $7.44 $7.44
Demand Response and ILR Compliance Penalty Credits $0.00 $0.00 $0.00
RPM Auction Credits $1,032,360.76 $0.00 $1,032,360.76
Auction Revenue Rights Credits $0.00 $52,183.27 $52,183.27
Synchronized Reserve Credits $0.00 $0.00 $0.00
PJM Scheduling System Control and Dispatch Service Charges $0.00 ($17,085.73) ($17,085.73)
Transmission Owner Scheduling System Control and Dispatch
Service Charges $0.00 ($5,454.54) ($5,454.54)
Reactive Supply and Voltage Control from Generation Sources
Service Charges $0.00 ($24,777.82) ($24,777.82)
Black Start Service Charges $0.00 ($1,205.73) ($1,205.73)
North American Electric Reliability Corporation (NERC) Charge $0.00 ($499.21) ($499.21)
Reliability First Corporation (RFC) Charges $0.00 ($638.70) ($638.70)
Expansion Cost Recovery Charges $0.00 ($431.52) ($431.52)
Transmission Enhancement Charges $0.00 ($31,635.67) ($31,635.67)
Black Start Service Credits $5,486.77 $0.00 $5,486.77
Non-Firm Point-to-Point Transmission Service Credits $0.00 $1,545.52 $1,545.52
Generation Deactivation $0.00 $789.19 $789.19
Market Monitoring Unit (MMU) Funding $0.00 ($394.43) ($394.43)
Organization of PJM States, Inc. (OPSI) Funding $0.00 ($46.25) ($46.25)
FERC Annual Recovery $0.00 ($4,096.43) ($4,096.43)
PPA $0.00 $879.62 $879.62
$1,037,847.53 ($1,641,094.95) ($603,247.42)
Dover Monthly PGAM Report July 2009 - Final
39
Page 46
II. LOAD, ALL IN ENERGY AND ALL IN COST OF SERVICE TABLE
Budget Load Actual Load Budget AIE Actual AIE Actual YTD AIE Budget AICS Actual AICS Actual YTD AICS
(MWh) (MWh) ($/MWh) ($/MWh) ($/MWh) ($/MWh) ($/MWh) ($/MWh)
Jul 81,189 71,704 $93.76 $93.11 $93.11 $99.69 $102.69 $102.69
Aug 82,798 $94.09 $101.23
Sep 67,000 $93.03 $99.53
Oct 61,170 $89.63 $98.32
Nov 58,037 $89.30 $98.74
Dec 59,534 $89.46 $99.70
Jan 64,805 $92.14 $100.84
Feb 63,547 $91.38 $97.04
Mar 58,753 $90.80 $99.03
Apr 56,824 $92.10 $101.53
May 62,655 $91.96 $99.69
Jun 72,496 $94.17 $105.37
Dover Monthly PGAM Report July 2009 - Final
40
Page 47
III. GLOSSARY
All In Unit Energy Cost ("AIE") accounts for the wholesale energy costs excluding capacity
obligations, capacity credits for Dover-owned generation, generation revenues, generating plant
costs, the black start ancillary services credit for the Van Sant plant, and revenues associated with
the sale of emission allowances. The AIE includes the costs from settling the hedged or forward
transactions; the energy bought on the ISO (Independent System Operator or PJM) day-ahead to
cover the open position (un-hedged); load following costs associated with balancing the actual load
in the ISO real-time market; energy management service related fees; the ISO transmission charges
and credits to load serving entities; the ISO ancillary services charges such as generation regulation,
spinning reserve, and reactive power; and the ISO administrative charges and cost of service
recovery fees.
All In Cost of Service ("AICS") accounts for the net cost of wholesale power to the City of Dover
Electric Utility. The AICS starts with the AIE and adds the costs or credits from capacity
obligations, capacity credits for Dover-owned generation, generation revenues, generating plant
costs, the black start ancillary services credit for the Van Sant plant, and revenues associated with
the sale of emission allowances.
Black Start is a generating ancillary service that is the process of restoring a generating plant to
service without the support of an external power supply to power auxiliary equipment needed for
start up operations.
Capacity UCAP Obligated Purchased is the obligation and payment by all load serving entities in
PJM including Dover for the Unforced Capacity (UCAP) requirement from PJM that satisfies the
PJM reserve requirements.
Generation Capacity Credit: is the credit provided to generators for supply capcity to the system.
The price is determined by the PJM Reliability Pricing Market auction process that includes three
auctions for each capacity year.
Generation Production Margin accounts for the variable margin excluding variable O&M and
emissions. The Generation Production Margin is calculated by taking the PJM revenues credited to
the plant including any balancing charges or credits less the fuel costs. Generation Production
Margin includes both “Economic and reliability dispatch” and “Testing.” Economic and reliability
dispatch equals the margin achieved when Dover’s generating plants are dispatched by PJM for
either economic dispatch (the system energy price is greater than the Dover bid price) or reliability
dispatch whereby PJM pays the generating cost of the plants for the hours the plant is run to support
the system. Generation Testing equals the Generation Production Margin associated with testing.
This is usually expected to be a negative margin because the plant is potentially being dispatched /
run when energy prices do not cover its costs.
Non-Production Revenue equals the credits from PJM to Dover for Generation Capacity Credit, the
Black Start Revenue and the sales by Dover of Emission Allowances.
Dover Monthly PGAM Report July 2009 - Final
41