UTILITY COMMITTEE AGENDA March 9, 2009 - 5:00 P.M. - Council Chambers - City Hall - City of Dover Public comments are welcomed on any item and will be permitted at appropriate times. When possible, please notify the City Clerk (736-7008 or e-m ail at Tm cdowell@dover.de.us) should you wish to be recognized. AGENDA ADDITIONS/DELETIONS 1. Federal Stimulus Program and Dover’s Utilities and Energy Programs A. Water/Wastewater B. Energy Block Grant C. Renewable Energy 2. PACE/NAES Monthly Report (January) A. Status Report - Pollution Remediation Project 3. Adjournment by 5:55 P.M. /tm S:\ClerksOffice\PACKETS\2009\Committee\UTILITY\03-09-2009\03-09-2009 UTILITY.wpd THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.

Page 2

Memorandum Office of the City Manager PO Box 475 Dover, DE 19903 Phone: (302) 736-7005 FAX: (302) 736-7002 E-mail tdeprima@dover.de.us To: Utility Committee From: Anthony J. DePrima, AICP, ICMA-CM City Manager Date: March 9, 2009 Subject: American Recovery and Reinvestment Act Please see the enclosed information we received from the United States Conference of Mayors which summarizes all aspects of the stimulus funding.

Page 3

! ! ! ! "#$%&'()!*$'+,$%-!().!*$&),$/0#$)0!"'0! ! 1%&$2&)3!4(5$%!2+%!6$7%8(%-!9:!;<&0$!=+8/$!>$$0&)3! ! 4%$/&.$)0!1(%('?!@7(#(! A&'$!4%$/&.$)0!B+/$5<!*C!1&.$)D!B%C! ! "00+%)$-!E$)$%(F!G%&'!=+F.$%! H$'%$0(%-!+2!G.8'(0&+)!"%)$!I8)'()! H$'%$0(%-!+2!G)$%3-!H0$,$)!J<8! H$'%$0(%-!+2!=+8/&)3!().!K%7()!I$,$F+5#$)0!H<(8)!I+)+,()! H$'%$0(%-!+2!L%()/5+%0(0&+)!*(-!M(=++.! ! ! ! ! ! ! 6$7%8(%-!NOD!9::O! !

Page 4

! ! L=G!KPQLGI!HL"LGH! J@P6G*GPJG!@6!>"R@*H! ! ! >()8$F!"C!S>())-T!I&(U! #$%&'!&(!#)$*)! +',-).,/0! ! E%$3!P&'?$F/! #$%&'!&(!1,$002,! 3)4,!+',-).,/0! ! GF&U(7$0<!1C!V(80U! #$%&'!&(!56'/-7)22,! 1,4&/.!3)4,!+',-).,/0! ! L+#!J+'<%()! 89:!$/.!9;,460)7,!<)',40&'! ! ! ! ! ! ! L<$!K)&0$.!H0(0$/!J+)2$%$)'$!+2!>(-+%/! NW9:!G-$!H0%$$0D!P;! ;(/<&)30+)D!IJ!9:::W! L$FX!9:9C9OYCZYY:! 6([X!9:9C9OYC9Y\9! G#(&FX!0'+'<%()]8/#(-+%/C+%3! 8/#(-+%/C+%3 ! "!

Page 5

! ! Q>4MG>GPL"LQ@P!@6!VGR!JQLR!4*Q@*QLQGH!QP!"**"! ! QC!!GPG*ER!"PI!GPAQ*@P>GPL! ! G)$%3-!G22&'&$)'-!().!J+)/$%,(0&+)!1F+'?!E%()0!SGGJ1ET!4%+3%(#!^!6+%#8F(!^!_9C`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a<(0!2('0+%/!a&FF!7$!8/$.!0+!(FF+'(0$!2+%#8F(! 28)./!(#+)3!'&0&$/!().!'+8)0&$/!a<&'<!(%$!.&%$'0!%$'&5&$)0/!+2!2+%#8F(!3%()0/D! (F0<+83<!5+58F(0&+)!&/!F&?$F-!0+!7$!0<$!?$-!2('0+%C!;<$)!a&FF!2+%#8F(!(FF+'(0&+)/!7$! ())+8)'$.b!!"F/+D!0<$!&)0$%('0&+)!7$0a$$)!0<$!2+%#8F(!3%()0!5%+3%(#!().!0<$! '+#5$0&0&,$!3%()0!5%+3%(#!<(/!0+!7$!.$0$%#&)$.!7-!I@GC! ! =!

Page 6

! U> "L!QHHKGX!=+a!'()!#(-+%/D!a<+!a$%$!&),+F,$.!&)!0<$!'%$(0&+)!+2!GGJ1ED!'+)0&)8$!0+! (//&/0!I@G!&)!0<$!.$,$F+5#$)0!+2!0<$!38&.()'$b!!L<$!#$#7$%/<&5!+2!0<$!(.,&/+%-! 7+(%.!'%$(0$.!7-!0<$!(80<+%&U&)3!F$3&/F(0&+)!/<+8F.!&)'F8.$!#(-+%/C! G)$%3-!G22&'&$)'-!().!J+)/$%,(0&+)!1F+'?!E%()0!SGGJ1ET!4%+3%(#!^!J+#5$0&0&,$!^!_c::! #&FF&+)! "> GPPG!$2-&!)/426.,-!(6/.)/B!(&'!$!<:9V.)',40,.!4&*A,0)0)7,!B'$/0-!A'&B'$*!@D)4D!@)22! A'&7).,!(6/.)/B!0&!4)0),-!$/.!4&6/0),->!!1A,4)()4!.,0$)2-!&/!0D)-!)/)0)$0)7,!@)22!/&0!C,! $7$)2$C2,!6/0)2!<:9!.,7,2&A-!0D,!A'&B'$*!'62,->! => "L!QHHKGX!!;$!(//8#$!0<(0!(FF!'&0&$/!'()!(55F-!2+%!0<&/!5%+3%(#C!!GGJ1E!5%+3%(#! 38&.()'$!<(/!)+0!-$0!7$$)!&//8$.D!().!0<$!&)0$%('0&+)!7$0a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a(-!Q)2%(/0%8'08%$!^!_9ZCW!7&FF&+)!! SQ)'F8.$/!H8%2('$!L%()/5+%0(0&+)!4%+3%(#!dHL4e!M+'(F!"%$(!68).&)3!^!_`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`!! $> +$--,/B,'!$/.!(',)BD0!'$)2!0'$/-A&'0$0)&/a! C> +&'0!)/('$-0'6406',!A'&X,40-a! ! M!

Page 7

! 4> 8&/-0'640)&/K!',4&/-0'640)&/K!',D$C)2)0$0)&/K!',-6'($4)/BK!',-0&'$0)&/K!$/.! &A,'$0)&/$2!)*A'&7,*,/0-!(&'!D)BD@$%-!H)/426.)/B!I/0,'-0$0,!D)BD@$%-J!$/.! C').B,-!H)/426.)/B!C').B,-!&/!A6C2)4!'&$.-!&(!$22!(6/40)&/$2!42$--)()4$0)&/-Ja! .> W'$/-)0!A'&X,40-!)/426.)/B!7,D)42,-!$/.!($4)2)0),-a! ,> 8$'A&&2!A'&X,40-K!(')/B,!$/.!4&'').&'!A$'S)/B!($4)2)0),-!$/.!A'&B'$*-K!C)4%42,! 0'$/-A&'0$0)&/!$/.!A,.,-0')$/!@$2S@$%-a! (> #&.)()4$0)&/!&(!A6C2)4!-).,@$2S-!0&!4&*A2%!@)0D!0D,!G*,')4$/-!@)0D!<)-$C)2)0),-! G40!&(!"QQEa! B> ])BD@$%!$/.!0'$/-)0!-$(,0%!)/('$-0'6406',!)*A'&7,*,/0-!$/.!A'&B'$*-K!D$[$'.! ,2)*)/$0)&/-K!A'&X,40-!0&!*)0)B$0,!D$[$'.-!4$6-,.!C%!@)2.2)(,K!$/.!'$)2@$%V D)BD@$%!B'$.,!4'&--)/B-a! D> ])BD@$%!$/.!0'$/-)0!',-,$'4D!$/.!.,7,2&A*,/0!$/.!0,4D/&2&B%!0'$/-(,'! A'&B'$*-a! )> 8$A)0$2!$/.!&A,'$0)/B!4&-0-!(&'!0'$(()4!*&/)0&')/BK!*$/$B,*,/0K!$/.!4&/0'&2! ($4)2)0),-!$/.!A'&B'$*-a! X> 16'($4,!0'$/-A&'0$0)&/!A2$//)/B!A'&B'$*-a! S> I/('$-0'6406',VC$-,.!)/0,22)B,/0!0'$/-A&'0$0)&/!-%-0,*-!4$A)0$2!)*A'&7,*,/0-a! $/.! 2> 9/7)'&/*,/0$2!',-0&'$0)&/!$/.!A&2260)&/!$C$0,*,/0!A'&X,40-!0&!$..',--!@$0,'! A&2260)&/!&'!,/7)'&/*,/0$2!.,B'$.$0)&/!4$6-,.!&'!4&/0')C60,.!0&!C%! 0'$/-A&'0$0)&/!($4)2)0),->! U> L6/.)/B!*$%!C,!6-,.!&/!L,.,'$2VG).!'&$.-a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

Page 8

! "E> +'&X,40-!@D)4D!$',!/&0!)/!$!WI+!4$/!C,!)/426.,.!0D'&6BD!$/!$*,/.*,/0!A'&4,-->!!HG1G+K! 4&/0$40!%&6'!*,0'&A&2)0$/!A2$//)/B!&'B$/)[$0)&/!b#+:c!',A',-,/0$0)7,!(&'!$..)0)&/$2! )/(&'*$0)&/!&/!0D,!$*,/.*,/0!A'&4,-->J!!! ""> +'&X,40-!)/!$/!$AA'&7,.!WI+!&'!1WI+!$',!/&0!',Y6)',.!0&!B&!0D'&6BD!$/!$*,/.*,/0!)(!0D,! -4D,.62,.!)*A2,*,/0$0)&/!&(!0D,!A'&X,40!)-!4D$/B,.!@)0D)/!0D,!(&6'V%,$'!A,')&.!&(!0D,! WI+!&'!1WI+>!!G/!G.*)/)-0'$0)7,!#&.)()4$0)&/!)-!-6(()4),/0!(&'!4D$/B)/B!0D,!-4D,.62,!&(!$! A'&X,40!)/!0D,!WI+!&'!1WI+!@)0D)/!0D$0!(&6'V%,$'!A,')&.>! "=> "L!QHHKGX!!H$,$)0-!5$%'$)0!+2!0<$!28).&)3!&/!5%+,&.$.!0+!/0(0$/!a&0<!)+!/5(0&(F!+%!5F('$f 7(/$.!.&/0%&780&+)!%$g8&%$#$)0/C!!Q0!a+8F.!7$!7+0<!(55%+5%&(0$!().!<$F528F!0+!<(,$! ".#&)&/0%(0&+)!+22&'&(F/!$#5<(/&U$!0<$!7%+(.!2F$[&7&F&0-!+2!0<$/$!28)./!0+!/855+%0!(! %()3$!+2!0%()/5+%0(0&+)!/+F80&+)/D!().!(F/+!$#5<(/&U$!0<$!)$$.!2+%!/0(0$!0%()/5+%0(0&+)! +22&'&(F/!0+!$)/8%$!7(F()'$.!0%()/5+%0(0&+)!&),$/0#$)0!5(00$%)/!a&0<&)!/0(0$/C!!L+! /855+%0!0<&/D!0<$!".#&)&/0%(0&+)!'()!$)/8%$!0<(0!0<$!0%('?&)3!+2!<&3<a(-!28)./!0<%+83<! *$'+,$%-C3+,!&)'F8.$/!5F('$f7(/$.!2$(08%$/!S&C$CD!(#+8)0!+2!28)./!().!)8#7$%!+2! 5%+h$'0/!.$F&,$%$.!0+!/5$'&2&'!F+'(F!(%$(/!().!%$3&+)/T!/+!0<(0!0<$!587F&'!'()!28FF-! 8).$%/0().!0<$!&),$/0#$)0/!&)!0<$&%!F+'(F!(%$(/D!8/&)3!5+58F(0&+)D!)8#7$%!+2! 8)$#5F+-$.!5$%/+)/D!().i+%!+0<$%!%$F$,()0!$'+)+#&'!&).&'(0+%/C!!! "M> "L!QHHKGX!!>(-+%/!+20$)!.+)j0!<(,$!(''$//!0+!0<$!/0(0$!F&/0/!+2!k%$(.-!0+!3+l!5%+h$'0/! 5%$5(%$.!7-!/0(0$!.$5(%0#$)0/!+2!0%()/5+%0(0&+)C!!;<(0!5%+'$//!'()!#(-+%/!8/$!0+!3$0! (''$//!0+!0<+/$!F&/0/!().!0+!(..!0<$&%!5%+h$'0/!0+!0<$#b! "Z> "L!QHHKGX!!Q2!#(-+%/!(%$!)+0!(7F$!0+!(''$//!0<$&%!/0(0$!F&/0/!+%!%$/+F,$!+0<$%!5%+7F$#/D! a<+!+)!I@Lj/!LQEG*!L$(#!'()!0<$-!'(FF!2+%!(//&/0()'$b! ! KHI@L!J+#5$0&0&,$!E%()0!2+%!P(0&+)(F!H8%2('$!L%()/5+%0(0&+)!H-/0$#!^!_NC\!7&FF&+)!! "> <)-4',0)&/$'%!B'$/0-!@)22!C,!$@$'.,.!0&!-0$0,!$/.!2&4$2!B&7,'/*,/0-!&'!0'$/-)0!$B,/4),-! &/!$!4&*A,0)0)7,!C$-)->! => +'&X,40-!@)22!D$7,!0&!D$7,!$!-)B/)()4$/0!)*A$40!&/!0D,!/$0)&/K!*,0'&A&2)0$/!$',$K!&'!$! ',B)&/>! M> 92)B)C2,!$',`! $> P&$.!$/.!C').B,!A'&X,40-a! C> +6C2)4!0'$/-A&'0$0)&/!A'&X,40-K!)/426.)/B!d,@!10$'0-!&'!1*$22!10$'0-a! 4> +$--,/B,'!$/.!(',)BD0!'$)2!A'&X,40-a!$/.! .> +&'0!)/('$-0'6406',!)/7,-0*,/0-K!)/426.)/B!A'&X,40-!0D$0!4&//,40!A&'0-!0&!&0D,'! *&.,-!&(!0'$/-A&'0$0)&/!$/.!)*A'&7,!0D,!,(()4),/4%!&(!(',)BD0!*&7,*,/0>!!! Z> L6/.)/B!6/.,'!0D)-!D,$.)/B!-D$22!C,!/&0!2,--!0D$/!e=E!*)22)&/!$/.!/&0!B',$0,'!0D$/!eMEE! *)22)&/>! N> L,.,'$2!-D$',!)-!"EE!A,'4,/0>! T> <:W!-D$22!B)7,!A')&')0%!0&!A'&X,40-!0D$0!',Y6)',!$!4&/0')C60)&/!&(!(,.,'$2!(6/.-!)/!&'.,'!0&! 4&*A2,0,!$/!&7,'$22!()/$/4)/B!A$4S$B,K!$/.!A'&X,40-!,;A,40,.!0&!C,!4&*A2,0,.!@)0D)/! 0D',,!%,$'-!&(!,/$40*,/0>! F> <:W!-D$22!A6C2)-D!B'$/0!4')0,')$!/&0!2$0,'!0D$/!QE!.$%-!$(0,'!,/$40*,/0>! U> GAA2)4$0)&/-!(&'!(6/.)/B!-D$22!C,!-6C*)00,.!/&0!2$0,'!0D$/!"UE!.$%-!$(0,'!A6C2)4$0)&/!&(! B'$/0!4')0,')$>! ! N!

Page 9

! Q> 1,2,40,.!A'&X,40-!@)22!',4,)7,!(6/.)/B!/&0!2$0,'!0D$/!&/,!%,$'!$(0,'!,/$40*,/0>! "E> "L!QHHKGX!!;<(0!(%$!0<$!#$0%+D!%$3&+)(FD!+%!)(0&+)(F!'%&0$%&(!0<(0!5%+h$'0/!#8/0!#$$0! 0+!7$!28).$.b! ! 487F&'!L%()/5+%0(0&+)!^!_`Cc!7&FF&+)! "> GPPG!(6/.-!@)22!C,!.)-0')C60,.!0D'&6BD!$!(&'*62$!.)',402%!0&!-0$0,-!$/.!0'$/-)0!$B,/4),->! => WD,!2$@!A'&7).,-!"EE!A,'4,/0!(,.,'$2!-D$',K!,;4,A0!(&'!d,@!10$'0->! M> L6/.-!*6-0!C,!$AA&'0)&/,.!/&0!2$0,'!0D$/!="!.$%-!$(0,'!,/$40*,/0>! Z> +'&X,40-!*6-0!C,!$AA'&7,.!)/!WI+\1WI+>! N> W'$/-)0!L&'*62$!?'$/0-!$',!(6/.,.!$0!eT>Q!C)22)&/`! $> "UE!.$%-!(&22&@)/B!$AA&'0)&/*,/0K!NE!A,'4,/0!&(!0D,!(6/.-!$AA&'0)&/,.!@)22!C,! @)0D.'$@/!$/.!',.)-0')C60,.!0&!&0D,'!6'C$/)[,.!$',$-!&'!-0$0,-!0D$0!D$7,!/&0! D$.!(6/.-!@)0D.'$@/>! C> :/,!%,$'!(&22&@)/B!$AA&'0)&/*,/0K!$/%!6/&C2)B$0,.!(6/.-!@)22!C,!@)0D.'$@/! ('&*!,$4D!6'C$/)[,.!$',$!&'!-0$0,!$/.!',.)-0')C60,.!0&!6'C$/)[,.!$',$-!&'!-0$0,-! 0D$0!D$7,!/&0!D$.!(6/.-!@)0D.'$@/>! T> WD,!L);,.!?6).,@$%!#&.,'/)[$0)&/!L&'*62$!)-!(6/.,.!$0!eFNE!*)22)&/`! $> L6/.-!*6-0!C,!$AA&'0)&/,.!/&0!2$0,'!0D$/!="!.$%-!$(0,'!,/$40*,/0>! C> "UE!.$%-!(&22&@)/B!$AA&'0)&/*,/0K!NE!A,'4,/0!&(!0D,!(6/.-!$AA&'0)&/,.!@)22!C,! @)0D.'$@/!$/.!',.)-0')C60,.!0&!&0D,'!6'C$/)[,.!$',$-!&'!-0$0,-!0D$0!D$7,!/&0! D$.!(6/.-!@)0D.'$@/>! 4> :/,!%,$'!(&22&@)/B!$AA&'0)&/*,/0K!$/%!6/&C2)B$0,.!(6/.-!@)22!C,!@)0D.'$@/! ('&*!,$4D!6'C$/)[,.!$',$!&'!-0$0,!$/.!',.)-0')C60,.!0&!6'C$/)[,.!$',$-!&'!-0$0,-! 0D$0!D$7,!/&0!D$.!(6/.-!@)0D.'$@/>! F> d,@!10$'0-\1*$22!10$'0-!)-!(6/.,.!$0!eFNE!*)22)&/`!!! $> +')&')0%!)-!B)7,/!0&!A'&X,40-!0D$0!$',!46'',/02%!)/!4&/-0'640)&/!&'!$',!$C2,!0&! &C2)B$0,!(6/.-!@)0D)/!"NE!.$%-!&(!,/$40*,/0>!! C> +'&X,40!(6/.)/B!)-!UE!A,'4,/0!(,.,'$2\=E!A,'4,/0!-0$0,!$/.!2&4$2>! ! =&3<fH5$$.!*(&FiQ)0$%'&0-!4(//$)3$%!*(&F!^!_`!7&FF&+)! "> ^)0D)/!TE!.$%-!&(!,/$40*,/0K!<:W!-D$22!-6C*)0!0&!0D,!]&6-,!$/.!1,/$0,!8&**)00,,-!&/! GAA'&A')$0)&/-!$!-0'$0,B)4!A2$/!0D$0!.,-4')C,-!D&@!(6/.)/B!@)22!C,!6-,.!0&!)*A'&7,!$/.! .,A2&%!D)BDV-A,,.!A$--,/B,'!'$)2!-%-0,*->!!! => ^)0D)/!"=E!.$%-!&(!,/$40*,/0K!<:W!-D$22!)--6,!)/0,')*!B6).$/4,!0&!$AA2)4$/0-!4&7,')/B! 0,'*-K!4&/.)0)&/-K!$/.!A'&4,.6',-!6/0)2!()/$2!',B62$0)&/-!$',!)--6,.>!!! M> WD,!2$@!A'&7).,-!"EE!A,'4,/0!(,.,'$2!(6/.)/B>! ! "#0%(?!^!_`\:!#&FF&+)!! "> GPPG!.)-0')C60,-!(6/.-!.)',402%!0&!G*0'$S>! => +')&')0%!-D$22!C,!B)7,/!0&!A'&X,40-!(&'!0D,!',A$)'K!',D$C)2)0$0)&/K!&'!6AB'$.,!&(!'$)2'&$.! $--,0-!&'!)/('$-0'6406',K!$/.!(&'!4$A)0$2!A'&X,40-!0D$0!,;A$/.!A$--,/B,'!'$)2!4$A$4)0%! )/426.)/B!0D,!',D$C)2)0$0)&/!&(!'&22)/B!-0&4S>! M> L6/.-!@)22!C,!$@$'.,.!/&0!2$0,'!0D$/!ME!.$%-!&(!,/$40*,/0>! ! T!

Page 10

! Z> +'&X,40-!(6/.,.!-D$22!C,!4&*A2,0,.!@)0D)/!0@&!%,$'-!&(!,/$40*,/0>! N> d&0!*&',!0D$/!TE!A,'4,/0!&(!0D,!(6/.-!*$%!C,!6-,.!(&'!4$A)0$2!A'&X,40-!$2&/B!0D,! d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c!7&FF&+)! H(2$!I%&)?&)3!;(0$%!*$,+F,&)3!68).!SH*6T!^!_9!7&FF&+)! "> GPPG!(6/.-!@)22!C,!.)-0')C60,.!0D'&6BD!$!(&'*62$!.)',402%!0&!0D,!-0$0,-!@D)4D!@)22!60)2)[,! 0D,!',7&27)/B!2&$/!(6/.->!!WD,',!$',!/&!/&/V(,.,'$2!*$04D)/B!',Y6)',*,/0->! => WD,!C)22!',Y6)',-!0D$0!-0$0,-!6-,!f/&0!2,--!0D$/!NE!A,'4,/0g!&(!0D,!(6/.-!(&'!A')/4)A$2! (&'B)7,/,--K!/,B$0)7,!)/0,',-0!2&$/-K!&'!B'$/0->!O/.,'!GPPGK!-0$0,-!$',!.)',40,.!0&!(6/.! A'&X,40-!&/!-0$0,!A')&')0%!2)-0-!0D$0!4$/!C,!-0$'0,.!@)0D)/!"=!*&/0D-!&(!,/$40*,/0>!! ^D,',!A'&X,40-!$',!/&0!6/.,'!4&/0'$40!&'!4&/-0'640)&/!@)0D)/!"=!*&/0D-!&(!0D,!.$0,!&(! ,/$40*,/0K!0D,!9+G!G.*)/)-0'$0&'!-D$22!',$22&4$0,!0D,!(6/.->!! M> I(!0D,',!$',!-6(()4),/0!,2)B)C2,!A'&X,40!$AA2)4$0)&/-K!0D,!-0$0,-!-D$22!6-,!/&0!2,--!0D$/!=E! A,'4,/0!&(!0D,!(6/.-!(&'!A'&X,40-!0D$0!f$..',--!B',,/!)/('$-0'6406',K!@$0,'K!&'!,/,'B%! ,(()4),/4%!)*A'&7,*,/0-!&'!&0D,'!,/7)'&/*,/0$22%!)//&7$0)7,!$40)7)0),->g!!! Z> "L!QHHKGX!!1$'(8/$!+2!/0(0$!5%('0&'$/D!(22+%.(7&F&0-!'%&0$%&(D!+%!+0<$%!2('0+%/D!#()-! '&0&$/!)$,$%!%$'$&,$!H*6!28).&)3C!!M(%3$%!'&0&$/!#(-!)+0!7$!(FF+a$.!0+!(55F-!2+%! 28).&)3D!+%!F(%3$%!5%+h$'0/!#(-!)+0!7$!28).$.!+%D!&)!/+#$!'(/$/D!$,$)!5F('$.!+)!/0(0$! 5%&+%&0-!F&/0/D!7$'(8/$!0<$-!a+8F.!'+)/8#$!(FF!+2!(!/0(0$j/!%$/+8%'$/C!!! N> "L!QHHKGX!!G4"!/<+8F.!)+0!(FF+a!/0(0$/!0+!$/0(7F&/<!%8F$/!a<&'<!(%7&0%(%&F-!5%$,$)0!()-! '+##8)&0-!2%+#!(55F-&)3!2+%!H*6!28).&)3C!!Q2!/0(0$/!'())+0!/5$).!0<&/!#+)$-D!0<$!G4"! ".#&)&/0%(0+%!/<+8F.!5%+,&.$!&0!.&%$'0F-!0+!'&0&$/!a<$%$!&0!'()!7$!8/$.!2+%!#8'<f )$$.$.!%$5(&%!a+%?C! ! 1%+a)2&$F./!^!_N::!#&FF&+)! "> 9+G!)-!46'',/02%!)/!0D,!*)..2,!&(!$!5'&@/(),2.-!B'$/0!4%42,!(&'!$--,--*,/0!$/.!42,$/6A! (6/.->!HGAA2)4$0)&/-!@,',!.6,!)/!d&7,*C,'>J!!9+G!)-!A2$//)/B!0&!60)2)[,!0D,!GPPG!(6/.-! 0&!(6/.!$..)0)&/$2!Y6$2)(),.!$AA2)4$/0-!@D&!-6C*)00,.!',Y6,-0-!)/!d&7,*C,'>!!I(!9+G! .&,-!/&0!D$7,!,/&6BD!Y6$2)0%!$AA2)4$0)&/-!)/!0D)-!46'',/0!'&6/.K!)0!@)22!B&!C$4S!0&!A$-0! Y6$2)(),.!$AA2)4$0)&/-!0D$0!@,',!/&0!(6/.,.!.6,!0&!2$4S!&(!(6/.->! => 9+G!-&&/!@)22!C,!)--6)/B!',Y6,-0-!(&'!$AA2)4$0)&/-!(&'!h&C!W'$)/)/B!?'$/0->!! ! ! F!

Page 11

! QQQC!!4@AG*LRD!;@*VD!"PI!@44@*LKPQLR! !! J+##8)&0-!I$,$F+5#$)0!1F+'?!E%()0!SJI1ET!^!_N!7&FF&+)! "> 8<5?!(6/.-!@)22!C,!.)-0')C60,.!0D'&6BD!0D,!Li=EEU!(&'*62$!0&!=EEU!B'$/0,,->! => ]O<!@)22!.,7,2&A!',Y6)',*,/0-!0&!,;A,.)0,!0D,!6-,!&(!0D,!(6/.->!!GPPG!A,'*)0-!]O<!0&! @$)7,!&'!-A,4)(%!$20,'/$0)7,!A'&B'$*!',Y6)',*,/0-!j!-&!2&/B!$-!0D,%!$',!4&/-)-0,/0!@)0D! 0D,!&7,'$22!A6'A&-,!&(!0D,!-0$060,>!! M> h6')-.)40)&/-!*6-0!B)7,!A')&')0%!0&!A'&X,40-!0D$0!4$/!$@$'.!4&/0'$40-!C$-,.!&/!C).-!@)0D)/! "=E!.$%-!&(!0D,!.$0,!&/!@D)4D!(6/.-!$',!*$.,!$7$)2$C2,!0&!0D,*>! ! P$&3<7+%<++.!H0(7&F&U(0&+)!4%+3%(#!SPH4T!^!_9!7&FF&+)! "> d1+!(6/.-!@)22!C,!$22&4$0,.!4&*A,0)0)7,2%>!!]O<!4$/!-,0!$!*)/)*6*!B'$/0!-)[,>! => 92)B)C2,!,/0)0),-!)/426.,!-0$0,-K!6/)0-!&(!2&4$2!B&7,'/*,/0!$/.!/&/A'&()0!,/0)0),-!&'! 4&/-&'0)$!&(!/&/A'&()0!,/0)0),-a!/&/A'&()0-!*$%!-6C*)0!A'&A&-$2-!)/!A$'0/,'-D)A!@)0D!(&'V A'&()0!,/0)0),->! M> ]O<!*6-0!A6C2)-D!4')0,')$!(&'!B'$/0!4&*A,0)0)&/!@)0D)/!FN!.$%-!&(!,/$40*,/0K!@)0D! $AA2)4$0)&/-!.6,!0&!]O<!@)0D)/!"NE!.$%-!&(!,/$40*,/0>!!]O<!*6-0!&C2)B$0,!$22!(6/.-! @)0D)/!&/,!%,$'!&(!,/$40*,/0>! Z> ?'$/0,,-!*6-0!-A,/.!$0!2,$-0!NE!A,'4,/0!&(!$22&4$0,.!(6/.-!@)0D)/!0@&!%,$'-!&(!.$0,! (6/.-!C,4&*,!$7$)2$C2,!0&!0D,*K!$/.!"EE!A,'4,/0!@)0D)/!0D',,!%,$'->! N> "L!QHHKGX!!=+a!a&FF!)+)5%+2&0!$)0&0&$/!0<(0!%$'$&,$!28).&)3!7$!%$g8&%$.!0+!'++%.&)(0$! 0<$&%!('0&,&0&$/!a&0<!F+'(F!3+,$%)#$)0/b! !! 487F&'!=+8/&)3!J(5&0(F!68).!^!_c!7&FF&+)! "> :(!0D,!0&0$2!L6/.K!eM!C)22)&/!@)22!C,!.)-0')C60,.!C%!(&'*62$K!e"!C)22)&/!@)22!C,!$@$'.,.! 4&*A,0)0)7,2%>!!]O<!4$/!6-,!6A!0&!E>N!A,'4,/0!&(!0D,!(6/.-!(&'!.,A$'0*,/0$2!4&-0->! => 8&*A,0)0)7,!B'$/0-!$',!0&!C,!6-,.!(&'!fA')&')0%!)/7,-0*,/0-Kg!)/426.)/B!)/7,-0*,/0-!0D$0! 2,7,'$B,!A')7$0,!-,40&'!(6/.)/B!&'!()/$/4)/B!(&'!',/&7$0)&/-!$/.!,/,'B%!4&/-,'7$0)&/! ',0'&()0!)/7,-0*,/0->! M> +]G-!*6-0!B)7,!A')&')0%!)/!0D,!6-,!&(!(6/.-!0&!0D,!',D$C)2)0$0)&/!&(!7$4$/0!$A$'0*,/0-K! A'&X,40-!6/.,'@$%!&'!)/!0D,)'!()7,V%,$'!4$A)0$2!A2$/K!$/.!A'&X,40-!0D$0!4$/!$@$'.! 4&/0'$40-!C$-,.!&/!C).-!@)0D)/!"=E!.$%-!&(!0D,!.$0,!&/!@D)4D!(6/.-!$',!*$.,!$7$)2$C2,! 0&!0D,*>! Z> ]O<!*6-0!&C2)B$0,!0D,!(&'*62$!(6/.-!@)0D)/!ME!.$%-!&(!,/$40*,/0!$/.!*6-0!&C2)B$0,! 4&*A,0)0)7,!B'$/0-!C%!1,A0,*C,'!MEK!=EEQ>! ! ! U!

Page 12

! =+#$F$//!4%$,$)0&+)!68).!^!_NC\!7&FF&+)! "> L6/.-!@)22!C,!.)-0')C60,.!6-)/B!0D,!9*,'B,/4%!1D,20,'!?'$/0!H91?J!(&'*62$>!!]O<!4$/! 6-,!E>N!A,'4,/0!&(!(6/.-!(&'!.,A$'0*,/0$2!4&-0->! => ]O<!)-!$22&@,.!0&!-,0!$!*)/)*6*!B'$/0!-)[,>! M> L6/.-!*$%!C,!6-,.!(&'!-D&'0V&'!*,.)6*V0,'*!',/0$2!$--)-0$/4,a!D&6-)/B!',2&4$0)&/!$/.! -0$C)2)[$0)&/!-,'7)4,-K!)/426.)/B!D&6-)/B!-,$'4Da!*,.)$0)&/!&'!&60',$4D!0&!A'&A,'0%! &@/,'-a!4',.)0!',A$)'a!-,46')0%!&'!60)2)0%!.,A&-)0-a!60)2)0%!A$%*,/0-a!',/0$2!$--)-0$/4,!(&'!$! ()/$2!*&/0D!$0!$!2&4$0)&/!$/.!*&7)/B!4&-0!$--)-0$/4,a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`! $> G.620!,*A2&%*,/0!$/.!0'$)/)/B!$40)7)0),-!j!eNEE!*)22)&/a! C> i&60D!H$B,!"TV=ZJ!$40)7)0),-K!)/426.)/B!-6**,'!%&60D!,*A2&%*,/0!j!e">=!C)22)&/a! 4> <)-2&4$0,.!@&'S,'!,*A2&%*,/0!$/.!0'$)/)/B!$40)7)0),-!j!e">=N!C)22)&/>! => GPPG!$2-&!A'&7).,-!(6/.)/B!(&'!0@&!.)-4',0)&/$'%!A'&B'$*-`! $> i&60D56)2.!j!eNE!*)22)&/a! C> ])BD!B'&@0D!$/.!,*,'B)/B!)/.6-0'%!-,40&'!@&'S,'!0'$)/)/B!$/.!A2$4,*,/0!j!eFNE! *)22)&/>! ! B+7!J+%5/!6('&F&0&$/!^!_9\:!#&FF&+)! GPPG!(6/.-!*$%!C,!6-,.!(&'!0D,!4&/-0'640)&/K!',D$C)2)0$0)&/K!$/.!$4Y6)-)0)&/!&(!h&C! 8&'A-!8,/0,'->!!WD,!1,4',0$'%!&(!R$C&'!*$%!0'$/-(,'!6A!0&!"N!A,'4,/0!&(!0D,-,!(6/.-!0&! *,,0!0D,!&A,'$0)&/$2!/,,.-!&(!8,/0,'-a!0D)-!*$%!)/426.,!0'$)/)/B!(&'!4$',,'-!)/!0D,! ,/,'B%!,(()4),/4%K!',/,@$C2,!,/,'B%K!$/.!,/7)'&/*,/0$2!A'&0,40)&/!)/.6-0'),->!!! ! H0(0$!6&/'(F!H0(7&F&U(0&+)!68).!SG.8'(0&+)T!^!_\YCW!7&FF&+)! "> WD'&6BD!0D)-!L6/.K!GPPG!A'&7).,-!eMQ>NZ!C)22)&/!(&'!B,/,'$2!()-4$2!',2),(!(&'!A6C2)4! -4D&&2-!$/.!A6C2)4!4&22,B,->!!L6/.-!$',!0&!C,!6-,.!C%!0D,!-0$0,-!0&!*$)/0$)/!0D,)'!(6/.)/B! 2,7,2-!(&'!kV"=!,.64$0)&/>!!I/!$..)0)&/K!-0$0,-!*$%!6-,!-&*,!&(!0D,)'!(6/.-!0&!l*,,0! *$)/0,/$/4,!&(!,((&'0!',Y6)',*,/0-!6/.,'!0D,!919G!$/.!I<9GKl!@D)4D!A'&7).,-! $..)0)&/$2!(2,;)C)2)0%>! => :/4,!R9G-!',4,)7,!0D,)'!(6/.-!0D,%!4$/!C,!6-,.!(&'!$/%!A6'A&-,!$60D&')[,.!C%!919GK! I<9GK!0D,!G.620!$/.!L$*)2%!R)0,'$4%!G40K!&'!0D,!+,'S)/-!8$',,'!$/.!W,4D/)4$2!9.64$0)&/! G40K!&'!(&'!*&.,'/)[$0)&/K!',/&7$0)&/K!&'!',A$)'!&(!A6C2)4!-4D&&2!($4)2)0),->!! ! Q!

Page 13

! M> WD,!GPPG!A'&7).,-!eU>U!C)22)&/!)/!(2,;)C2,!(6/.)/B!0&!0D,!B&7,'/&'!(&'!A6C2)4!-$(,0%!$/.! &0D,'!B&7,'/*,/0!-,'7)4,->!!WD,!2$@!',Y6)',-!-64D!(6/.-!0&!C,!6-,.!l>>>(&'!A6C2)4!-$(,0%! $/.!&0D,'!B&7,'/*,/0!-,'7)4,-K!@D)4D!!"#!)/426.,!$--)-0$/4,!(&'!,2,*,/0$'%!$/.! -,4&/.$'%!,.64$0)&/!$/.!A6C2)4!)/-0)060)&/-!&(!D)BD,'!,.64$0)&/!$/.!(&'!*&.,'/)[$0)&/K! ',/&7$0)&/K!&'!',A$)'!&(!A6C2)4!-4D&&2!($4)2)0),-!$/.!)/-0)060)&/-!&(!D)BD,'!,.64$0)&/! ($4)2)0),-K!)/426.)/B!*&.,'/)[$0)&/K!',/&7$0)&/K!$/.!',A$)'-!0D$0!$',!4&/-)-0,/0!@)0D!$! ',4&B/)[,.!B',,/!C6)2.)/B!'$0)/B!-%-0,*>g!!! Z> "L!QHHKGX!!Q0!(55$(%/!0<(0!3+,$%)+%/!<(,$!)+!#().(0$!0+!/5$).!0<&/!28).&)3!+)!/'<++F! #+.$%)&U(0&+)!+%!%$5(&%!().!0<(0!/8'<!/5$).&)3!&/!$)0&%$F-!(0!0<$&%!.&/'%$0&+)C!!Q2!0<&/!&/! 0<$!'(/$D!<+a!'()!#(-+%/!().!F+'(F!(%$(/!(''$//!0<&/!28).&)3!0<%+83<!0<$&%!3+,$%)+%/! 0+!5(-!2+%!7(.F-!)$$.$.!/'<++F!%$5(&%/!().!#+.$%)&U(0&+)b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

Page 14

! J+##8)&0-!=$(F0<!J$)0$%/!^!_9!7&FF&+)! "> ?'$/0-!B&!0&!L,.,'$22%!m6$2)(),.!],$20D!8,/0,'-!@D)4D!$',!A6C2)4!$/.!A')7$0,!/&/VA'&()0! D,$20D!4$',!&'B$/)[$0)&/-!*,,0)/B!4,'0$)/!4')0,')$!6/.,'!0D,!#,.)4$',!$/.!#,.)4$).! +'&B'$*-!H',-A,40)7,2%K!1,40)&/-!"UT"H$$JHZJ!$/.!"QENH2JH=JH5J!&(!0D,!1&4)$2!1,46')0%!G40! $/.!',4,)7,!(6/.-!6/.,'!0D,!],$20D!8,/0,'!+'&B'$*!H1,40)&/!MME!&(!0D,!+6C2)4!],$20D! 1,'7)4,!G40J>! => "L!QHHKGX!!;&FF!6$.$%(FF-!m8(F&2&$.!=$(F0<!J$)0$%!F++?f(F&?$/!(F/+!7$!$F&3&7F$!2+%! /0&#8F8/!28).&)3b! ! ;+#$)D!Q)2()0/!().!J<&F.%$)!^!_\::!#&FF&+)! WD)-!B'$/0!A'&B'$*!)-!$.*)/)-0,',.!C%!0D,!<,A$'0*,/0!&(!GB')46206',a!0D,',!$',!QE!^I8! -0$0,!$B,/4),-!j!NE!-0$0,!D,$20D!.,A$'0*,/0-K!MZ!I/.)$/!0')C$2!&'B$/)[$0)&/-K!0D,!<)-0')40! &(!8&26*C)$K!$/.!()7,!0,'')0&'),-!j!$/.!$AA'&;)*$0,2%!ZTKEEE!$60D&')[,.!',0$)2,'->!!!^I8! &A,'$0,-!0D'&6BD!=KEEE!2&4$2!$B,/4),-!)/!"EKEEE!42)/)4!-)0,->! ! L$#5+%(%-!"//&/0()'$!2+%!P$$.-!6(#&F&$/!SL"P6T!^!_Y!7&FF&+)! WGdL!)-!$!-0$0,!C2&4S!B'$/0!A'&7).)/B!@,2($',!$--)-0$/4,!0&!,2)B)C2,!2&@V)/4&*,!($*)2),->! GPPG!A'&7).,-!$..)0)&/$2!',-&6'4,-!0&!-0$0,-!@D)4D!D$7,!*&',!A&&'!($*)2),-!/,,.)/B! C$-)4!$--)-0$/4,!.6,!0&!0D,!',4,--)&/K!$/.!@D)4D!D$7,!',-A&/.,.!C%!-,'7)/B!*&',! ($*)2),-!)/!0D,)'!WGdL!A'&B'$*->! ! H855F$#$)0(F!P80%&0&+)!"//&/0()'$!4%+3%(#!SHP"4T!^!_9:!7&FF&+)! "> WD)-!A'&B'$*!H(&'*,'2%!0D,!L&&.!10$*A!A'&B'$*J!)-!$.*)/)-0,',.!$0!0D,!(,.,'$2!2,7,2!C%! 0D,!<,A$'0*,/0!&(!GB')46206',_-!L&&.!$/.!d60')0)&/!1,'7)4,!HLd1J>!!10$0,!$B,/4),-! $.*)/)-0,'!0D,!A'&B'$*!$0!-0$0,!$/.!2&4$2!2,7,2-a!0D,)'!',-A&/-)C)2)0),-!)/426.,! .,0,'*)/$0)&/!&(!,2)B)C)2)0%!$/.!$22&0*,/0-K!$/.!.)-0')C60)&/!&(!C,/,()0->! => #&-0!&(!0D,!GPPG!(6/.)/B!H$C&60!e"Q!C)22)&/J!@)22!C,!6-,.!0&!)/4',$-,!*$;)*6*!(&&.! -0$*A!C,/,()0-!C%!"M>T!A,'4,/0a!0D,!)/4',$-,!B&,-!)/0&!,((,40!)/!GA')2!=EEQ>!!WD,!/,@! 2,7,2!@)22!-0$%!)/!A2$4,!)/!-6C-,Y6,/0!%,$'-!6/0)2!0D,!A'&B'$*_-!',B62$'!$//6$2!)/(2$0)&/! $.X6-0*,/0-!&7,'0$S,!0D,!C,/,()0!)/4',$-,>!!G22!(&&.!-0$*A!D&6-,D&2.-!j!46'',/02%!$C&60! "Z!*)22)&/K!4&/0$)/)/B!*&',!0D$/!M"!*)22)&/!)/.)7).6$2-!j!@)22!C,/,()0!('&*!0D,!)/4',$-,>! ! "20$%/'<++F!>$(F/!^!_N::!#&FF&+)! "> WD,!8D)2.!$/.!G.620!8$',!L&&.!+'&B'$*!H8G8L+J!)-!$!.)',40!2&4$2!',)*C6'-,*,/0!A'&B'$*! A'&7).)/B!/60')0)&/!$--)-0$/4,!(&'!%&6/B!4D)2.',/!$/.!$.620-!',4,)7)/B!.$%!4$',>!!WD,! A'&B'$*!A'&7).,-!4$-D!A$%*,/0-!$/.!O1<G!4&**&.)0),->! => 8G8L+!$2-&!A'&7).,-!-6AA,'-!)/!$(0,'-4D&&2!4$',!A'&B'$*-!)/!<,2$@$',K!I22)/&)-K! #)4D)B$/K!#)--&6')K!d,@!i&'SK!:',B&/K!+,//-%27$/)$K!$/.!^,-0!3)'B)/)$>!! ! H$)&+%!P80%&0&+)!4%+3%(#/!^!_N::!#&FF&+)! WD)-!)-!$!.)',40!-0$0,!(&'*62$!B'$/0!A'&B'$*!0D$0!(6/.-!,2.,'2%!/60')0)&/!A'&B'$*-!-64D! $-!#,$2-!&/!^D,,2->! ! ! ""!

Page 15

! J+#5(//&+)!J(5&0(F!68).!^!_\:!#&FF&+)! "> WD)-!)-!$!.)',40!4&*A,0)0)7,!B'$/0!A'&B'$*!(&'!($)0DVC$-,.!)/)0)$0)7,-!$.*)/)-0,',.!C%! ]]1_-!G.*)/)-0'$0)&/!(&'!8D)2.',/!$/.!L$*)2),-K!8&**6/)0%!1,'7)4,-!<)7)-)&/>! => G!/,@!PL+!(&'!46'',/0!(6/.-!@)22!C,!',2,$-,.!@)0D)/!@,,S->! M> d,@!GPPG!(6/.)/B!*,4D$/)-*-!D$7,!/&0!%,0!C,,/!.,0,'*)/,.>!! ! QAC!!4K1MQJ!H"6GLR! ! J+##8)&0-!@%&$)0$.!4+F&'&)3!H$%,&'$/!SJ@4HT!^!_N!7&FF&+)! "> L6/.-!$',!.)-0')C60,.!4&*A,0)0)7,2%>! => GPPG!@$)7,-!C&0D!0D,!eFNKEEEVA,'V&(()4,'!4$A!$/.!0D,!=N!A,'4,/0!*$04D>!! M> WD,!C)22!A'&7).,-!(&'!0D,!D)')/B!$/.!',D)')/B!&(!2$@!,/(&'4,*,/0!&(()4,'->! Z> "L!QHHKGX!Q0!&/!8)'F$(%!<+a!0<$!J@4H!@22&'$!a&FF!(.#&)&/0$%!0<$/$!'+#5$0&0&,$!3%()0/D! ().!<+a!&0!a&FF!(FF+a!28).&)3!0+!7$!8/$.!0+!5%$,$)0!F(-+22/C!! ! 1-%)$!B8/0&'$!"//&/0()'$!E%()0/!SB"ET!^!6+%#8F(!^!_9!7&FF&+) "> L&'0%!A,'4,/0!&(!0D,!0&0$2!hG?!$22&4$0)&/!B&,-!.)',402%!('&*!0D,!h6-0)4,!<,A$'0*,/0_-! 56',$6!&(!h6-0)4,!G--)-0$/4,!0&!2&4$2!2$@!,/(&'4,*,/0!$B,/4),-!C%!(&'*62$!C$-,.!&/!0D,! L5I_-!O/)(&'*!8')*,!P,A&'0>!! => :(!0D,!TE!A,'4,/0!0D$0!A$--,-!0D'&6BD!0D,!-0$0,-K!T=!A,'4,/0!B&,-!.)',402%!0&!2&4$2!2$@! ,/(&'4,*,/0!$B,/4),->! M> 5%'/,!hG?!(6/.-!*$%!C,!6-,.!(&'!2$@!,/(&'4,*,/0!A'&B'$*-a!A'&-,460)&/!$/.!4&6'0! A'&B'$*-a!A',7,/0)&/!$/.!,.64$0)&/!A'&B'$*-a!4&'',40)&/-!$/.!4&**6/)0%!4&'',40)&/-! A'&B'$*-a!.'6B!0',$0*,/0!$/.!,/(&'4,*,/0!A'&B'$*-a!A2$//)/BK!,7$26$0)&/K!$/.! 0,4D/&2&B%!)*A'&7,*,/0!A'&B'$*-a!$/.!4')*,!7)40)*!$/.!@)0/,--!A'&B'$*-!H&0D,'!0D$/! 4&*A,/-$0)&/J> Z> "L!QHHKGX!!=+a!a&FF!0<$!1-%)$!B"E!().!J@4H!()0&f/855F()0(0&+)!5%+,&/&+)/!7$! &)0$%5%$0$.b!!L<$!1-%)$!B"E!28)./!a&FF!7$!8/$.!&##$.&(0$F-!0+!%$0(&)!5+/&0&+)/!0<(0! +0<$%a&/$!a+8F.!7$!$F&#&)(0$.C!!Q0!&/!&#5+%0()0!0<(0!F(a!$)2+%'$#$)0!(3$)'&$/!(%$! (7F$!0+!%$0(&)!0<+/$!h+7/!a&0<+80!%&/?!+2!,&+F(0&)3!0<$!()0&f/855F()0(0&+)!%8F$/C ! 1-%)$!B8/0&'$!"//&/0()'$!E%()0/!SB"ET!^!J+#5$0&0&,$!^!_99\!#&FF&+) WD)-!(6/.)/B!@)22!C,!$@$'.,.!C%!0D,!<,A$'0*,/0!&(!h6-0)4,!(&'!f4&*A,0)0)7,K!A,,'! ',7),@,.!B'$/0-!0&!6/)0-!&(!-0$0,K!2&4$2K!$/.!0')C$2!B&7,'/*,/0K!$/.!0&!/$0)&/$2K!',B)&/$2K! $/.!2&4$2!/&/VA'&()0!&'B$/)[$0)&/-!0&!A',7,/0!4')*,K!)*A'&7,!0D,!$.*)/)-0'$0)&/!&(! X6-0)4,K!A'&7).,!-,'7)4,-!0&!7)40)*-!&(!4')*,K!-6AA&'0!4')0)4$2!/6'06')/B!$/.!*,/0&')/B!&(! $0V')-S!4D)2.',/!$/.!%&60DK!$/.!(&'!&0D,'!-)*)2$'!$40)7)0),->g!! ! H+80<a$/0!1+%.$%i=&3<!Q)0$)/&0-!I%83!L%(22&'?&)3!"%$(/!^!J+#5$0&0&,$!^!_c:!#&FF&+)! L6/.)/B!@)22!C,!A'&7).,.!(&'!$--)-0$/4,!$/.!,Y6)A*,/0!0&!2&4$2!2$@!,/(&'4,*,/0! $B,/4),-!$2&/B!0D,!1&60D@,-0!C&'.,'!$/.!)/!])BD!I/0,/-)0%!<'6B!W'$(()4S)/B!G',$-> ! ! "=!

Page 16

! 6&%$2&3<0$%!"//&/0()'$!E%()0/!^!_9N:!#&FF&+) WD)-!(6/.)/B!@)22!C,!$@$'.,.!0D'&6BD!4&*A,0)0)7,!B'$/0-!/&0!0&!,;4,,.!e"N!*)22)&/!0&! ,/$C2,!()',!.,A$'0*,/0-!0&!*&.)(%K!6AB'$.,K!&'!4&/-0'640!/&/V(,.,'$2!()',!-0$0)&/-> A&+F$)'$!"3(&)/0!;+#$)!^!_99\!#&FF&+) L6/.)/B!)-!A'&7).,.!0D'&6BD!(&'*62$!B'$/0-!0&!0D,!-0$0,-!(&'!7)&2,/4,!$B$)/-0!@&*,/! A',7,/0)&/!$/.!A'&-,460)&/!A'&B'$*-K!@)0D!eNE!*)22)&/!',-,'7,.!(&'!0'$/-)0)&/$2!D&6-)/B! $--)-0$/4,!B'$/0-!(&'!7)40)*-!&(!.&*,-0)4!7)&2,/4,K!-0$2S)/BK!&'!-,;6$2!$--$620> ! AC!!"*LH!"PI!L@K*QH>! ! P(0&+)(F!G).+a#$)0!2+%!0<$!"%0/!^!_\:!#&FF&+)! L&'0%!A,'4,/0!He=E!*)22)&/J!@)22!C,!.)-0')C60,.!C%!(&'*62$!0&!-0$0,!$'0-!$B,/4),-!$/.! ',B)&/$2!$'0-!&'B$/)[$0)&/-a!TE!A,'4,/0!HeME!*)22)&/J!@)22!C,!$@$'.,.!4&*A,0)0)7,2%!0&! B&7,'/*,/0$2!$/.!/&/B&7,'/*,/0$2!$'0-!$B,/4),-!(&'!$'0-!A'&X,40-!$/.!$40)7)0),-!0&! ',0$)/!X&C->! ! !! ! ! "M!

Page 17

CITY OF DOVER PUBLIC UTILITIES DEPARTMENT WATER / WASTEWATER INFRASTRUCTURE IMPROVEMENT PROJECTS FUNDING TO PROJECT DESCRIPTION COMPLETE 1.0 MG Elevated Storage Proposed water storage tank to meet future $3,284,230.00 Tank demand and fire protection storage volume requirements. Piney Point Well Proposed water production well to increase $453,800.00 production capacity to meet future demand and fire protection requirements as well as improve system pressure and stabilize chlorine residuals. E. State Street Area Replace approximately 5,500 l.f. of old, $846,897.50 Water Quality undersized water main to alleviate brown water Improvements issues and structural concerns. (Includes N. Penn. Ave, Madison Rd., American Ave. Ext., Hazel Rd., Smith St. and Maryland Ave.) US Route 13 Water Replace approximately 5,000 l.f. of old, $953,700.00 Quality Improvements undersized water main to reduce brown water issues and structural concerns. (Includes area of US Route 13 between N. State St and Oak Lane.) Pear Street Water Replace approximately 4,700 l.f. of old, $722,357.00 Quality Improvements undersized water main to reduce brown water issues and structural concerns. (Includes Pear St., Mary St., and N. West St.) Bayard Avenue Water Replace approximately 3,400 l.f. of old, $533,510.00 Quality Improvements undersized water main to alleviate brown water issues and structural concerns. (Includes Bayard Ave., Bayard Ave. Alley and Greenhill Rd.) Inflow/Infiltration Reline approximately 7,500 l.f of sanitary sewer $3,600,000.00 Removal main and 640 v.f. of manholes which are deteriorating to address groundwater infiltration and structural concerns. (Includes mains from 12" to 36".) US Route 13 Sewer Construct approximately 5,700 l.f. of gravity $3,058,306.81 Interceptor sanitary sewer main to meet future demand requirements, to reroute flow to avoid backups on older lines and to abandon older force mains and a pump station. Fox Hall Retreat Force Construct approximately 1,600 l.f. of force main $123,661.00 Main Rerouting to direct flow from the Walker Road sewer basin which is nearing capacity to the McKee sewer basin which is underutilized. Acorn Lane Pump Station Replace the aging pump station which is $382,555.00 Replacement operating beyond the projected life cycle. DSU Pump Station Replace the aging pump station which is $383,190.00 Replacement operating beyond the projected life cycle. $14,342,207.31

Page 18

City of Dover January Monthly Report Energy and Operations Management February 19, 2009 This Report was produced by Pace Global Asset Management, LLC (“Pace Global”) and is meant to be read as a whole and in conjunction with this disclaimer. Any use of this Report other than as a whole and in conjunction with this disclaimer is forbidden. Any use of this Report outside of its stated purpose without the prior written consent of Pace Global is forbidden. Except for its stated purpose, this Report may not be copied or distributed in whole or in part without Pace Global’s prior written consent. This Report and the information and statements herein are based in whole or in part on information obtained from various sources as of January, 2009. While Pace Global believes such information to be accurate, it makes no assurances, endorsements or warranties express or implied, as to the validity, accuracy or completeness of any such information, any conclusions based thereon, or any methods disclosed in this Report. Pace Global assumes no responsibility for the results of any actions and inactions taken on the basis of this Report. By a party using, acting or relying on this Report, such party consents and agrees that Pace Global, its employees, directors, officers, contractors, advisors, members, affiliates, successors and agents shall have no liability with respect to such use, actions, inactions, or reliance. This Report does contain some forward-looking opinions. Certain unanticipated factors could cause actual results to differ from the opinions contained herein. Forward-looking opinions are based on historical and/or current information that relate to future operations, strategies, financial results or other developments. Some of the unanticipated factors, among others, that could cause the actual results to differ include regulatory developments, technological changes, competitive conditions, new products, general economic conditions, changes in tax laws, adequacy of reserves, credit and other risks associated with City of Dover and/or other third parties, significant changes in interest rates and fluctuations in foreign currency exchange rates. Further, certain statements, findings and conclusions in this Report are based on Pace Global’s interpretations of various contracts. Interpretations of these contracts by legal counsel or a jurisdictional body could differ. over 25 Website: www.paceglobal.com Washington New York Houston Columbia San Diego London Moscow Mexico City

Page 19

TABLE OF CONTENTS 1.0 - Executive Summary.....................................................................................................................2 2.0 - Budget Report..............................................................................................................................6 2.1 – Variance Report ..................................................................................................................6 2.2 – Variance Analysis...............................................................................................................8 3.0 – Energy Management...................................................................................................................9 3.1 - Purchased Power .................................................................................................................9 3.2 - Generation Management ...................................................................................................12 3.3 - Emissions and Allowance Management............................................................................19 4.0 – Operations Management..........................................................................................................21 Appendices..........................................................................................................................................38 I. PJM Invoice Breakdown....................................................................................................38 II. Load, All In Energy and all in cost of service table ..........................................................39 III. Glossary ........................................................................................................................40 Dover Monthly PGAM Report January 2009 - Final 1

Page 20

1.0 - EXECUTIVE SUMMARY All In Unit Energy Cost - Actual v Budget Generation MWh's: Actual v Budget Actual Load vs Budget Load 12,500 $96 100,000 $94 10,000 75,000 $92 $90 7,500 MWh MWh 50,000 $ /M W h $88 5,000 $86 25,000 $84 2,500 $82 0 $80 0 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Budget Gen Actual Gen Budget Actual Budget ($/MWh) Actual ($/MWh) Budget WA Actual WA Purchased Power Management Wholesale load for the month of January was 65,021 MWhs versus a three year historic weather normalized load of 64,805 MWhs. Hedged transactions accounted for 60,480 MWhs or 93% of this volume (93% of forecasted load) at a cost of $4.7 million. Spot Market purchases resulted in a PJM charge of $0.66 million ($0.58 million charge in the Day Ahead market and a $0.09 million charge in the real time market). Other PJM related charges accounted for an additional $1.05 million cost, inclusive of all load related fees. January All-In Energy Unit Cost, excluding capacity obligations and credits matched the January 2009 budget of $88.79/MWh. For the year, projected All-In Energy Unit Cost is $0.06/MWh above the budget; based on YTD actual results and budgeted values for subsequent months. Generation and Asset Management For the month of January McKee Run and Van Sant units did not dispatch into the PJM market. A relatively low average on-peak LMPs for the month demonstrated that the PJM system did not generally require support from the peaking units. The budget for the month expected approximately 1,000 MWh of generation. For any revenues and costs associated with the Pollution Remediation CIP testing, it is appropriate to allocate these funds into the planned CIP budget. Therefore the negative Generation Production margin reported in December report was transferred from the electric revenue fund to the Dover’s CIP fund. Dover Monthly PGAM Report January 2009 - Final 2

Page 21

Emissions and Allowance Management Dover engaged in no allowance transactions during the month of January. McKee Run operated during December, but due to a delay in CEMS conversions for December, the adjustment to inventory values now has been accounted of for the current monthly report. Total net revenue through December 31st from allowance sales for the 2008-09 fiscal year is $165,470, accounting for Broker’s fees. Given current dispatch expectations, the market value of the Dover total allowance inventory is approximately $600 thousand at the time of this report. If sold, Dover would realize approximately $765 thousand in revenue for the year. This would result in a $677 thousand unfavorable variance. In December the D.C. Circuit Court remanded the Clean Air Interstate Rule (CAIR) without vacature. However, the SO2 allowance market has seen a marked decline. After initial positive reaction to the court ruling, continuing uncertainty regarding ultimate emissions limits and market structure has combined with the greater economic downturn to move allowance prices down to $100/ton. Additionally, generators have largely met compliance requirements for 2008, and with speculators currently avoiding the market, SO2 allowance demand is low approaching the March true-up. The uncertainty regarding allowance value was further heightened by the EPA announcement of its decision not to pursue the Clean Air Mercury Rule, which applied a cap-and-trade approach to mercury reduction. Instead, EPA will attempt a maximum achievable control technology (MACT) standard. The mercury reduction strategy likely to be employed through a MACT standard will be the use of scrubbers, which will also reduce SO2 emissions. Therefore, even if there becomes some clarity with respect to the updated CAIR rules, decisions regarding the MACT standard will leave the SO2 allowance market in uncertainty for at least the next year. After the Court decision to remand CAIR, annual NOx prices jumped sharply before settling to near $4000/ton. Over the past month, these prices have seen a steady decline to $3000/ton. Emissions controls appear to be working properly, and the poor economic forecasts have dampened allowance values. The seasonal NOx market had limited activity in January as the winter lull in trading continued. The limited trading did see the price drop from near $665/ton down to $600/ton, reflecting the downward pressure across the broader emissions markets. Similar to last month, however, market participants appear to be waiting for more regulatory certainty before the start of the ozone season. Pace is closely monitoring the NOx markets and will provide Dover with assessments of allowance allocations, liquidity, and value as information becomes available. The December RGGI quarterly auction cleared 31,505,898 allowances at $3.38/ton, and demand was reported to be 3.5 times greater than supply. Since the auction, the market has been very active with prices initially moving up over $4.00/ton, but since dropping to $3.50/ton. Based on projected generation and emissions Dover is projected to have an excess of 70,000 allowances through 2013 with a market value of nearly $245,000. Dover Monthly PGAM Report January 2009 - Final 3

Page 22

EMISSIONS & ALLOWANCE SUMMARY Allowance Allowance Emissions Emissions Allowances Allowances Allowance Vintage Allocation Month YTD Sold Month Sold YTD Balance SO2 – 2007 2723 0 98 0 2076 549 1 SO2 – 2008 2723 0 32 0 0 2,691 SO2 – 2009 2723 0 0 0 0 2723 NOx – 2007 198 0 32 0 166 0 NOx – 2008 198 0 20 0 178 0 NOx – 2009 198 0 0 0 0 198 Operations Management Summary During the month of January we experienced one restricted work day accident. There were no employee lost time accidents and no contractor related OSHA injuries, illnesses or lost time accidents. There were zero Environmental Notices of Violations issued during the month. All McKee Run Units and the VanSant unit were available to run during the month but were not dispatched by PJM. Monthly Budget Variance - The actual expenses attributable to O&M of the two sites for the month of January were $597,750. The expenses were $158,712 under the approved budget of $756,462. The principal reason for the favorable variance is due operating permits costing less than anticipated and rescheduling of turbine maintenance until the spring Unit 3 outage. These favorable variances were offset by an unfavorable variance for electrical usage during the Unit 3 testing. 1 Corrected 2007 SO2 tons emitted to reflect actual emission for Units 3 & 11. December, 2007 report included emissions for all four units. Dover Monthly PGAM Report January 2009 - Final 4

Page 23

Risk Management Summary Energy commodity prices fell further since the last reporting period, and have fallen almost continuously since June 2008. Bearish economic outlook kept oil prices below the $40/barrel mark, and natural gas prices, a prime driver of power prices relevant to the City, fell to their lowest levels in 6 years. In turn, PJM forward power prices decreased since the last reporting period by $5.19/MWh (8.4%) for Fiscal Year 2009-2010 and $3.39/MWh (3.7%) for Fiscal Year 2010-2011. Outer years observed comparable price declines as the entire forward curve drifted lower. The City’s projected wholesale Cost-of-Service for all forward power years is shown in the table below: 2 Wholesale Cost-of-Service Summary (Projected Date 02/17/2008 Budget February January December Cost-of- Cost-of Hedge Year-to Forecasted Cost-of Cost-of Power Year Service Service Ratio Year over 2008- Service Service Budget $/MWh Increase 09 Budget $/MWh $/MWh 2008-2009 $90.18 $90.55 92% 9.5% 0.41% $90.43 $90.65 2009-2010 N/A $93.66 87% 3.4% 3.86% $93.01 $93.28 2010-2011 N/A $87.84 73% -6.2% -2.60% $87.35 $88.15 2011-2012 N/A $83.51 62% -4.9% -7.40% $83.47 $84.04 2012-2013 N/A $82.68 38% -1.0% -8.32% $83.18 $84.15 2013-2014 N/A $79.15 0% -4.3% -12.24% NA NA * Reflects balance of year hedge ratio for current Power Year ** FY 07/08 Cost-of-Service is $82.70/ MWh 2 Note that the PJM-W to DPL zone basis has been updated based on actual basis values observed in the past 2 years, consistent with the proposed 2009-10 budget. The higher basis values are reflected in the February Wholesale Cost-of- Service values shown above, but not in the January and December values (which are consistent with prior reports). Dover Monthly PGAM Report January 2009 - Final 5

Page 24

2.0 - BUDGET REPORT 2.1 – VARIANCE REPORT Budget Actual Variance Jan-09 Jan-09 Jan-09 Load Forecast 64,805 65,021 (216) Power Supply Power Supply $4,346,873 $4,694,135 ($347,262) Power Supply Management $231,472 $250,516 ($19,044) Capacity Charges - Load $885,313 $893,960 ($8,647) PJM Charges - Load $1,175,441 $827,999 $347,442 Total - Power Supply $6,639,098 $6,666,609 ($27,511) Generation Plant Operations $717,731 $597,750 $119,981 Generation Fuel $249,417 $8,221 $241,196 Capacity Credits ($765,406) ($765,406) $0 PJM Credits ($236,901) ($5,729) ($231,173) Total - Generation ($35,160) ($165,164) $130,004 Emission Allowance Sales Total - Emission Allowance Sales $0 $0 $0 Total Power Supply & Generation $6,603,939 $6,501,445 $102,493 Total Power Supply, Generation & Emission Sales $6,603,939 $6,501,445 $102,493 Unit Costs Total – Power Supply $102.45 $102.53 ($0.08) Total - Generation + Emission Sales ($0.54) ($2.54) $2.00 Final Cost of Service to City of Dover Ratepayers $101.90 $99.99 $1.91 Dover Monthly PGAM Report January 2009 - Final 6

Page 25

Budget Actual Variance YTD YTD YTD Load Forecast 474,533 461,164 13,369 Power Supply Power Supply $32,346,502 $34,534,927 ($2,188,425) Power Supply Management $1,641,200 $1,759,441 ($118,242) Capacity Charges - Load $6,140,075 $6,200,726 ($60,651) PJM Charges - Load $8,280,765 $4,835,979 $3,444,785 Total - Power Supply $48,408,541 $47,331,074 $1,077,467 Generation Plant Operations $3,559,088 $3,034,270 $524,818 Generation Fuel $2,031,219 $1,410,419 3 $620,800 Capacity Credits ($5,359,912) ($5,341,541) ($18,371) PJM Credits ($2,242,787) ($1,500,514) 4 ($742,274) Total - Generation ($2,012,393) ($2,397,365) $384,972 Emission Allowance Sales Total - Emission Allowance Sales ($144,500) ($165,470) $20,970 Total Power Supply & Generation $46,396,148 $44,933,709 $1,462,440 Total Power Supply, Generation & Emission Sales $46,251,648 $44,768,239 $1,483,410 Unit Costs Total – Power Supply $102.01 $102.63 ($0.62) Total - Generation + Emission Sales ($4.55) ($5.56) $1.01 Final Cost of Service to City of Dover Ratepayers $97.47 $97.08 $0.39 3 The values are corrected to reflect updates to the total amounts reported from December, 2008 testing fuel and generation values associated with Pollution Remediation Project CIP. Generation Fuel was lowered by $521,797. 4 The values are corrected to reflect updates to the total amounts reported from December, 2008 testing fuel and generation values associated with Pollution Remediation Project CIP. PJM Credits was lowered by $265,616 in the real- time energy and credit of Balancing Operation Reserves Charges of $7,772.85. Dover Monthly PGAM Report January 2009 - Final 7

Page 26

2.2 – VARIANCE ANALYSIS Power Supply • Power Supply realized an unfavorable $347 thousand variance compared to the budget due to the purchase of additional 6.5% hedge forward positions totaling 3,720 MWh in January. This purchase was transacted after the FY 2008 budget was submitted to Dover. • The Power Supply Management variance is merely an estimate at this point. • As discussed during the July, 2008 Management Committee the PJM Base Residual Auction on April 3, 2008 resulted in a new $ per MW.day UCAP charge. This charge results in unfavorable variances each month. • The PJM Charges for Load experienced a positive $347 thousand variance due to the placement of additional hedge position of 3,720MWh; thereby displacing the open position by the same amount, and $162 thousand favorable load following variances for the month. Furthermore there were $26 thousand increase in transmission rights credits and $43 thousand favorable PJM ancillary charges for the month. Offsetting these favorable variances were $45 thousand increase in transmission costs and $152 thousand unfavorable basis variance. Generations • Plant O&M resulted in a favorable variance of $120 thousand compared to the approved budget of $717 thousand due to operating permits costing less than anticipated and rescheduling of turbine maintenance until the spring Unit 3 outage. These favorable variances were offset by an unfavorable variance for electrical usage during the Unit 3 testing for the month. • Generation Fuel realized a favorable variance of $241 thousand for the month due to no dispatch for the month. The budget expected nearly 94 thousand gallons of fuel oil no.2 consumed for the month. • PJM Credits resulted in $231 thousand unfavorable variance for the month. The budget expected 1,000MWh of generation for the month. Neither McKee Run nor Van Sant units dispatched into the PJM market. For the month of January McKee Run Unit 3 was placed under maintenance outage with PJM until the completion of pollution remediation project. • Variable costs and credits for testing post conversion from #6 residual oil to the much cleaner low sulfur #2 oil will be applied to the CIP for Pollution Remediation project. The variable production margin positive or negative will be applied to the CIP project and will not be reflected in the monthly operations report. Dover Monthly PGAM Report January 2009 - Final 8

Page 27

3.0 – ENERGY MANAGEMENT 3.1 - PURCHASED POWER Management Highlights • Dover’s January load was 65,021 MWh which was slightly above the historic weather normalized load of 64,805 MWh. Hedge volumes accounted for 93% of actual load for the month. • January All In Unit Energy cost excluding capacity of $88.78 is $0.01 per MWh below budget for the month. Actual Load vs Budget Load 100,000 75,000 MWh 50,000 25,000 0 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Budget Actual Dover Monthly PGAM Report January 2009 - Final 9

Page 28

All In Unit Energy Cost - Actual v Budget $96 $94 $92 $90 $/MWh $88 $86 $84 $82 $80 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Budget ($/MWh) Actual ($/MWh) Budget WA Actual WA Dover Monthly PGAM Report January 2009 - Final 10

Page 29

Purchased Power Variance Report Budget Actual Variance Jan-09 Jan-09 Jan-09 City of Dover Load Load Obligation (MWh) 64,805 65,021 (216) Unit Energy Costs ($ per MWh) Energy Cost (inc. Load Following & Pace Fees) $83.34 $83.42 ($0.09) Pass Through $4.45 $4.07 $0.38 Incentive Fees $1.00 $1.29 ($0.29) Total - All In Unit Energy Cost $88.79 $88.78 $0.01 Purchased Power Variance Analysis • Actual Dover load of 65,021 MWh was 0.3% above the projected January load of 64,805 MWh. • The All In Unit Energy Cost resulted in a favorable $0.01 per MWh variance due to positive $162 thousand load following variances, lower than anticipated open position energy costs, transmission rights credits, and PJM ancillary charges contributed to favorable variance for the month. The favorable variances were offset by an additional 6.5% of forward contracts placed after the Dover budget was submitted, $152 thousand unfavorable basis variance and the increased FERC approved DP&L transmission rates. • The Management Incentive fee variance on a $/MWh basis is merely an estimate at this point. PJM Power Balancing and Load Related Fees Purchased Power (Hedges): 60,480 MWh’s @ $77.61/MWh: $4,694,135 Power Balancing and Additional PJM and Energy Manager Fee 5: $1,972,474 Total Cost to Serve Load (65,021 MWh’s) $6,666,609 ALL in $/MWh load cost inclusive of Energy Manager Fees: $102.53/MWh 5 Includes estimated Incentive Fees. Dover Monthly PGAM Report January 2009 - Final 11

Page 30

3.2 - GENERATION MANAGEMENT • PJM did not dispatch Dover units into the market. Generation MWh's: Actual v Budget 12,500 10,000 7,500 MWh 5,000 2,500 0 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Budget Gen Actual Gen Dover Monthly PGAM Report January 2009 - Final 12

Page 31

2008-09 Generation Production Margin v Budget $500 Thousands $450 $400 $350 $300 $250 $200 $150 $100 $50 $0 ($50) Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun ($100) Budget ($) Actual ($) *Notes: July 2008 Report’s 2008-09 Generation Production Margin v Budget graph displayed incorrect actual amount. The graph shown above has been corrected to reflect the actual value. Dover Monthly PGAM Report January 2009 - Final 13

Page 32

Generation Management Variance Report Budget Actual Variance Jan-09 Jan-09 Jan-09 Self-Supplied Capacity from Gen (MW) McKee Run 1 13.2 13.2 0 McKee Run 2 16.7 16.7 0 McKee Run 3 97.4 97.4 0 Van Sant 38.1 38.1 0 Self Supplied Capacity from Gen (MW) 165.4 165.4 0 Additional Capacity from PJM Incremental Auction 7.9 7.9 0 Total Capacity from Gen (MW) 173.3 173.3 0 Gen Capacity Sales to PJM ($/MW.d) $148.80 $148.80 0 Incremental Auction Sales to PJM ($/MW.d) $10.00 $10.00 0 Power Sales Power Sales (MWh) 1,000 0 1,000 Sales Revenue ($ per MWh) ($231.50) $0.00 ($231.50) Power Sales Revenue ($) ($231,498) $0.00 ($231,498) Variable Fuel & Transport Fuel Oil No.2 Volume (gal) 93,863 0 93,863 Fuel Oil No.2 ($/gal) $2.20 $0.00 $2.20 Fuel Oil No.2 Cost of Goods Sold ($) $206,498 $0.00 $206,498 Fuel Oil No.6 Volume (gal) 0 0 0 Fuel Oil No.6 ($/gal) $0.00 0.00 $0.00 Fuel Oil No.6 Cost of Goods Sold ($) $0.00 0.00 $0.00 Gas Volume (Dth) 0 0 0 Unit Gas Price ($/Dth) $0.00 0 $0.00 Variable Gas Cost ($) $0.00 0 $0.00 Transport ($) $0.00 0 $0.00 Variable Gas and Transport Costs ($) $0.00 $0.00 $0.00 Variable Fuel & Transport Costs ($) $206,498 $0.00 $206,498 Testing $0.00 $0.00 $0.00 Generation Production Margin ($25,000.00) $0.00 ($25,000.00) Generation Capacity Payment Total - Generation Capacity Payment ($765,406) ($765,406) $0.00 Dover Monthly PGAM Report January 2009 - Final 14

Page 33

Generation Management Variance Analysis Fuel Expense • PJM did not dispatch Dover units into the market and it did not consume any fuel oil nor spot natural gas purchase for the month. Generation Production Margin Transaction Volumes Revenue/(Cost) PJM Invoice for Power Sold 0 MWh’s $0 Fuel and Transport 0 dth gas/0 gal #6 oil $0 0 gal #2 oil Generation Production Margin 0 MWh’s $0 The following non-production energy revenues and costs are generally fixed and not directly related to generation dispatch and power production. PJM Invoice (Black Start) $5,729 Fuel Oil Tank Heating & Black Start Gas Supply $0 Eastern Shore Demand Charge ($4,490) Eastern Shore Transport and Imbalance Charge $0 Transco Demand Charge ($3,732) Non-Production Energy Revenue/Costs ($2,493) Dover Monthly PGAM Report January 2009 - Final 15

Page 34

Fuel and Transportation Date Volume (Dth) Price ($/Dth) Total Commodity Cost ($) Hess Corp Sub-Total 0 $0 PESCO Sub-Total 0 $0 NJNG Sub-Total 0 $0 Total 0 $0 Do to the conversion from #6 residual oil to Low sulfur #2 oil the need for a constant supply of natural gas to heat the #6 fuel is no longer required. Some gas will still be required for winter heating of the building(s). Pace will still coordinate with NAES on the procurement of supply. However, this expense will now fall under the plant utility costs and be paid and budgeted for by the station. Dover Monthly PGAM Report January 2009 - Final 16

Page 35

Gas Transportation Purchased Eastern Shore Natural Gas Pipeline and TransCo agreements provide for deliveries to the McKee Run and VanSant stations. These charges include a firm demand charge and adjustments as follows: ESNG FT Demand Charge $4,490 TransCo FT Demand Charge $3,732 Total Purchases $8,222 Other Gas Purchases Commodity and transportation imbalances on Eastern Shore Pipeline for the month resulted in no cost and it is summarized as follows. Eastern Shore Transport and Imbalance Charges Imbalance/dth Estimated Cost/dth Estimated Total Cost 0 $0 $0 Transport Volume/dth $/dth Total Cost Firm/IT $0 $0 Net $0 Dover Monthly PGAM Report January 2009 - Final 17

Page 36

Purchased Commodity Fuel Oil Summary Neither McKee Run units nor Van Sant were dispatched into PJM and no fuel oil #2 was consumed for the month. McKee Run tank will maintain 3 days of load equivalent dispatches for McKee Run Units. At current fuel market prices, Pace and NAES are considering purchasing ultra low #2 fuel oil inventory when McKee Run tank testing are complete. Tank Inventory Estimates as of January 31 Tank Tank Capacity Inventory In Days of Burn (gallon) (gallon) (Typical Dispatch 6) McKee Run 7 (#6 2,554,105 416,831 N/A Fuel Oil to #2 Fuel Oil) VanSant 258,000 110,948 3 (#2 Fuel Oil) 6 As measured by tank level instruments. Tank levels may change due to oil temperature. 7 #6 Fuel Oil was sold ( approx. 122, 000 gallons) and #2 Fuel Oil was purchased in October and December. Dover Monthly PGAM Report January 2009 - Final 18

Page 37

3.3 - EMISSIONS AND ALLOWANCE MANAGEMENT As shown in Exhibit 1, total net revenue from allowance sales for the 2008-09 fiscal year is $165,470, accounting for Broker’s fees. City of Dover holds 2,693 tons of vintage 2008 SO2 allowances and no tons of vintage 2008 NOx allowances. Additionally, the City has a balance of 549 tons of vintage 2007 SO2 allowances. At the August 21, 2008 Management Committee meeting the Committee set a trigger price for the SO2 allowances of $260/ton whereby if the City could achieve this price it would sell half of its SO2 allowances. Exhibit 1: Emissions and Allowance Summary through January 31, 2008 2008-2009 EMISSIONS & ALLOWANCE SUMMARY SO2 NOx Date Action Allowance Sale Revenue1 Allowance Sale Revenue1 Allocation Price Allocation2 Price Seas. Ann. 1/1/08 Initial 2008 2,723 -- -- 198 -- -- -- Allocation 1/1/08 2007 549 -- -- 0 -- -- -- Carryover 7/21/08 Sold 150 -- -- -- -150 -- $975 $144,750 tons NOx 10/14/08 Sold 28 -- -- -- -28 -- $750 $20,720 tons NOx 12/31/08 2008 YTD -32 -- -- -202 -- -- -- 3 Emissions 1/1/09 Initial 2009 2,723 -- -- 49 76 -- -- Allocation4 Totals - 2007 Vintage 549 -- -- 0 -- -- -- Allowances - 2008 Vintage 2,691 -- -- 0 -- -- -- Allowances - 2009 Vintage 2,723 -- -- 49 76 -- $165,470 Allowances $165,470 $0 Total Revenue $165,470 Notes: (1) Revenue calculations account for a $1/ton broker fee for SO2 and a $10/ton broker fee for NOx. (2) Per the Clean Air Interstate Rule, in 2009, NOx emissions will be governed by a seasonal and annual program. The NOx seasonal emissions pertain only to emissions (May 1 – Sep 30), similar to the previous trading regimen. Annual emissions cover the entire year. (3) The 2009 initial allowance allocation accounts for the reinstatement of CAIR while new SO2 and NOx emissions rules are completed. These allocations may changes as the rulemaking process continues. Dover engaged in no allowance transactions during the month of January. McKee Run operated during December, but due to a delay in CEMS conversions for December, the adjustment to inventory values now has been accounted of for the current monthly report. Total net revenue Dover Monthly PGAM Report January 2009 - Final 19

Page 38

through December 31st from allowance sales for the 2008-09 fiscal year is $165,470, accounting for Broker’s fees. Given current dispatch expectations, the market value of the Dover total allowance inventory is approximately $600 thousand at the time of this report. If sold, Dover would realize approximately $765 thousand in revenue for the year. This would result in a $677 thousand unfavorable variance. During December the D.C. Circuit Court remanded the Clean Air Interstate Rule (CAIR) without vacature. However, allowance values have dropped sharply across all emissions trading markets. The SO2 allowance market has seen a marked decline. After initial positive reaction to the court ruling, continuing uncertainty regarding ultimate emissions limits and market structure has combined with the greater economic downturn to move allowance prices down to $100/ton. Additionally, generators have largely met compliance requirements for 2008, and with speculators currently avoiding the market, SO2 allowance demand is low approaching the March true-up. The uncertainty regarding allowance value was further heightened by the EPA announcement of its decision not to pursue the Clean Air Mercury Rule, which applied a cap-and-trade approach to mercury reduction. Instead, EPA will attempt a maximum achievable control technology (MACT) standard. The mercury reduction strategy likely to be employed through a MACT standard will be the use of scrubbers, which will also reduce SO2 emissions. Therefore, even if there becomes some clarity with respect to the updated CAIR rules, decisions regarding the MACT standard will leave the SO2 allowance market in uncertainty for at least the next year. After the Court decision to remand CAIR, annual NOx prices jumped sharply before settling to near $4000/ton. Over the past month, these prices have seen a steady decline to $3000/ton. Emissions controls appear to be working properly, and the poor economic forecasts have dampened allowance values. The seasonal NOx market had limited activity in January as the winter lull in trading continued. The limited trading did see the price drop from near $665/ton down to $600/ton, reflecting the downward pressure across the broader emissions markets. Similar to last month, however, market participants appear to be waiting for more regulatory certainty before the start of the ozone season. Pace is closely monitoring the NOx markets and will provide Dover with assessments of allowance allocations, liquidity, and value as information becomes available. The December RGGI quarterly auction cleared 31,505,898 allowances at $3.38/ton, and demand was reported to be 3.5 times greater than supply. Since the auction, the market has been very active with prices initially moving up over $4.00/ton, but since dropping to $3.50/ton. Based on projected generation and emissions Dover is projected to have an excess of 70,000 allowances through 2013 with a market value of nearly $245,000. Pace will continue to monitor the RGGI market and will advise Dover regarding allowance sales if the market alters. Dover Monthly PGAM Report January 2009 - Final 20

Page 39

4.0 – OPERATIONS MANAGEMENT Management Highlights • During the month of January, the plant experienced a recordable accident when an operator sprained his ankle when he slipped and fell while making rounds. There was no lost work time pertaining to the incident as the employee was assigned other duties still within his existing work description. Until the time of the accident, the plant had completed 1,392 days without a recordable accident. • During the month, there were no unit dispatches of any of the McKee Run units or Unit #11 at VanSant. All units were available for the month of January. • A representative of DNREC’s Tank Management Branch visited the site December 31, 2008 for the purpose of inspecting the fuel oil storage tank dike repairs required as the result of a fuel oil spill event. DNREC was satisfied with the completed remediation and repair work. • NAES completed several work orders that were initiated from the Areva Vibration Inspection report indicating possible mechanical problems. Also NAES completed work orders from recent Storm Technologies Inspection report indentifying minor repairs or adjustments to equipment clearances. • The plant received confirmation from the DNREC that there was no additional work or documentation needed from the remediation work of the oil leak in and around the #1 Tank berm. • The position of I,C/E Technician Applicant screening and the conducting preliminary interviews for the position of I,C/E Technician was completed and an employment offer has been given and accepted by Robert Gallucio. • The station continues to work on compliance with NERC and RFC standards for Generator Operator (GOP). • Preliminary discussions continue with Pace Global and Applied Power Projects on the addition of a HRSG at VanSant which could supply additional power output on the unit. • Aaron Jester passed the PJM certification exam on January 16th. He is our first operator to pass the exam other than management. Other operators are scheduled to take the exam in the coming weeks. • The station continues to work on compliance with NERC and RFC standards for Generator Operator (GOP). • The following is the NAES Monthly Report as submitted to PGAM Dover Monthly PGAM Report January 2009 - Final 21

Page 40

North American Energy Services Dover, DE January 2009 Monthly Report New #2 Fuel Oil Transfer and Unloading Pumps Dover Monthly PGAM Report January 2009 - Final 22

Page 41

Table of Contents 1.0 Environmental, Health and Safety 2.0 Financial 3.0 Operations 4.0 Maintenance 5.0 CIP 6.0 General Plant Information 7.0 Summary of NAES Performance Dover Monthly PGAM Report January 2009 - Final 23

Page 42

1.0 Environmental, Health and Safety: During the month of January, we experienced one restricted work day accident. The incident occurred when one of our employees slipped and fell on a patch of ice that was undetectable due to snowfall that same morning. The employee sprained his ankle during the fall. Even though the facility was able to assign the employee some of his normal work duties, the physician who examined the employee recommended some work restrictions resulting in this incident being categorized as a restricted work day accident. The employee was on restricted work for seven days when he returned to the physician and was released to full duty. It is our interpretation that this incident is considered an OSHA restricted work day accident. The employee did report to work every day so this was not considered a lost work day incident. The facility has now gone four days without an OSHA recordable accident and 1,397 consecutive days without a lost time reportable incident. A near miss occurred at the facility when two employees were transferring water treatment chemicals from drums to a bulk storage tank. The employees failed to read the labels on the drums assuming they were the same product. As a result, two different products were added to the same bulk storage tank. Fortunately, there was no chemical reaction when the two products were mixed together. A representative of DNREC’s Tank Management Branch visited the site December 31, 2008 for the purpose of inspecting the fuel oil storage tank dike repairs required as the result of a fuel oil spill event. DNREC was satisfied with the completed remediation and repair work. As a result of this inspection, DNREC issued the facility a letter indicating that this incident was officially closed out and no further action was required by the facility. Environmental, Health and Safety Statistics Month Fiscal Year to Date (January 2009) (7/1/08-6/30/09) NOVs 0 0 Opacity Deviations 0 8 Environmental Deviations 0 1 OSHA Recordable 1 1 OSHA LTA's 0 0 First Aid cases 0 0 Restricted Workday Accident 1 1 Near Miss 1 3 Man Hours Worked 4,836.5 34,992.25 Date last OSHA Recordable 1/27/09 Date last Lost Time Accident 4/05/05 Days since last OSHA recordable 4 Days since last Lost Time Accident 1,397 Dover Monthly PGAM Report January 2009 - Final 24

Page 43

Emissions (NOx & SO2) All data thru 1/31/09 NOx Summary - Year (May-Sept.)Tons Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL 2005 20.16 20.64 103.3 2.19 146.29 2006 1.82 1.78 19.25 1.72 24.57 2007 3.3 2.7 25.9 0.7 32.6 2008 1.01 0.96 17.0 1.28 20.25 2009 0.0 0.0 0.0 0.0 0.0 NOx Allowances Summary NOx NOx NOx Allowances Available Total NOx NOx Allowance Allowances (Per Facility, Prior to Sale) Tons Emitted Allowance Vintage Sold YTD McKee Run VanSant (NOx Season) Balance 2007 165 191 7 33 0 2008 178 191 7 20 0 2009 0 191 7 0 198 Note: NOx Season is May 1 to September 30. SO2 Summary - Year (Jan.-Dec.)Tons Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL 2005 49.91 52.08 530.24 2.30 634.69 2006 3.69 1.51 50.7 0.40 56.30 2007 6.28 5.31 97.69 0.28 109.56 2008 0.011 0.009 31.0 0.6 31.6 2009 0.0 0.0 0.0 0.0 0.0 Note: *Denoted data is as of 12/31/2008 SO2 Allowances Summary SO2 Allowances SO2 Available Total SO2 SO2 Allowances (Per Unit, Prior to Tons Allowances SO2 Allowance Sold - YTD Sale & Emitted – Balance Vintage Reconciliation) U3 and U11 Unit #3 Unit #11 YTD 2006 2725 2586 139 51 0 2007 2076 2585 138 98 549 2008 0 2585 138 32 2691 2009 0 2585 138 0 2723 Note: Denoted data is as of 1/31/2009 Dover Monthly PGAM Report January 2009 - Final 25

Page 44

CO2 Allowances Summary* CO2 CO2 CO2 Allowances Available Total CO2 CO2 Allowance Allowances (Per Facility, Prior to Sale) Tons Emitted Allowance Vintage Sold YTD Balance McKee VanSant Run 2009 0 59,805 2,045 0 61,850 2010 0 47,844 1,636 0 49,480 2011 0 35,883 1,227 0 37,110 2012 0 23,922 818 0 24,740 2013 0 11,961 409 0 12,370 Note: All CO2 allowance values are provided by the RGGI CO2 Allowance Tracking System. Dover Monthly PGAM Report January 2009 - Final 26

Page 45

2.0 Financial Financial – Current Month Month – January 2009 Actual Budget Variance Personnel 365,139 366,760 1,621 Administrative 80,606 204,552 123,946 EH & S 1,352 8,000 6,648 Maintenance Expense 17,147 75,350 58,203 Operations Expense 133,506 101,800 (31,706) Total $597,750 $756,462 $158,712 Financial – Fiscal Year to Date Number of Months – 7 Actual Budget Variance Personnel 1,754,272 1,907,084 152,812 Administrative 548,491 709,664 161,173 EH & S 20,117 22,500 2,383 Maintenance Expense 199,773 290,950 91,177 Operations Expense 486,576 600,000 113,424 Total $3,009,229 $3,530,198 $520,969 2.1 Variance analysis: The original budget for January was $756,462. The actual expenses for January are $597,750 for a positive variance of $158,712 or 2.68%. The variance was due to the following: PERSONNEL EXPENSES - Lower labor, overtime, and burden expenses accounted for a favorable variance of $1,621. ADMINISTRATIVE EXPENSES - A favorable variance of $123,946 was mainly due to the operating permits costing less than anticipated. ENVIRONMENTAL, HEALTH, AND SAFETY EXPENSES – A favorable variance of $6,648 was due to not needing to dispose of hazardous and non-hazardous waste as anticipated. MAINTENANCE EXPENSES- A favorable variance of $58,203 was due to the repairs to Unit #3 turning gear being moved out to April due to the later delivery of parts to complete the repairs. There was also an inventory reconciliation for items that were previously charged to our O&M budget. OPERATING EXPENSES – An unfavorable variance of $31,706 was due to higher electric usage than anticipated to support Unit #3 testing and for the replenishing of bulk chemicals. Sulfuric acid costs have increased significantly since the annual budget was submitted and approved. The current total for Project EG0804 expensed to date is $1,366,511. The expenses for the month of January were $195,690. Dover Monthly PGAM Report January 2009 - Final 27

Page 46

3.0 Operations Unit Operations / Outages / Trips • During the month, there were no unit dispatches of any of the McKee Run units or Unit #11 at VanSant. All units were available for the month of January. Month – January 2009 McKee McKee McKee MRS VanSant Total Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units Capacity MW 17 17 102 136 39 175 On Line Hours Hrs 0 0 0 0 0 0 Starts # 0 0 0 0 0 0 Gross Generation MWh 0 0 0 0 0 0 Net Generation MWh 0 0 0 0 0 0 Total Auxiliaries MWh 40.013 40.013 178.858 258.884 8.891 267.775 Auxiliaries purchased MWh 40.013 40.013 178.858 258.884 8.891 267.775 Fuel Gas Used MMBTU 0 0 0 0 0 0 Fuel Oil Used MMBTU 0 0 0 0 0 0 Fuel Oil Used Gallons 0 0 0 0 0 0 Total Fuel MMBTU 0 0 0 0 0 0 Net Heat Rate BTU/KWh 0 0 0 0 0 0 Unit Trips # 0 0 0 0 0 0 Capacity Factor % 0.00 0.00 0.00 0.00 0.00 0.00 Availability Factor % 100 100 100 100 100 100 Commercial % 0 0 0 0 0 0 Unavailability (CU) Planned Outage 0 0 Hours 0 0 0 0 Hours Maintenance Outage Hours 0 0 0 0 0 0 Hours Forced Outage Hours Hours 0 0 0 0 0 0 Reserve Shutdown Hours 744.000 744.000 744.000 2,232.000 744.000 2,976.000 Hours HW Boiler Gas Usage MMBTU 1,116 1,116 Pilot Gas Usage MMBTU 0 0 0 0 # Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from fuel flow instruments Dover Monthly PGAM Report January 2009 - Final 28

Page 47

2008-2009 Fiscal Year-to-Date (7 Months) McKee McKee McKee MRS VanSant Total Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units Capacity MW 17 17 102 136 39 175 On Line Hours Hrs 11.066 11.667 214.566 237.299 36.084 273.383 Starts # 1 1 18 20 6 26 Gross Generation MWh 123.315 132.412 12,203 12,458 1,240 13,699 Net Generation MWh 118.511 126.506 11,141 11,386 1,240 12,626 Total Auxiliaries MWh 203.253 204.356 2,303 2,711 27.264 2,738 Auxiliaries purchased MWh 198.449 198.450 1,241.157 1,638.054 26.456 1,665 Fuel Gas Used MMBTU 756 972 72,884 74,613 9,754 84,367 Fuel Oil Used MMBTU 776 616 61,409 62,801 6,273 69,074 Fuel Oil Used Gallons 0/5,568 0/4,418 0/116,114 297,805 45,328 469,233 /126,100 Total Fuel MMBTU 1,533 1,588 134,293 137,414 16,028 153,441 Net Heat Rate BTU/KWh 12,939 12,560 12,754 12,068 12,931 12,153 Unit Trips # 0 0 0 0 0 0 Capacity Factor % 0.14 0.14 2.12 1.90 0.62 1.40 Availability Factor % 60.05 60.05 58.01 63.37 98.91 72.26 Commercial % 0 0 0 0 0 0 Unavailability (CU) Planned Outage Hours Hours 1,752 1,752 2,166 5,670 0.0 5,670 Maintenance Outage Hours 0 0 0 0 56 56 Hours Forced Outage Hours Hours 0 0 0 0 0 0 Reserve Shutdown Hours Hours 3396.934 3,396.333 2,778.972 9,572.239 5,068 14,640.239 HW Boiler Gas Usage MMBTU 7,432 7,432 Pilot Gas Usage MMBTU 0 0 0 0 VanSant Lifetime through 1/31/09 Actual Starts Factored Starts Fired Hours VanSant 1189 2000.15 3,912.2 Since HGP - Dec 2004 140 332.45 528.578 Fuel Oil Inventory Monthly Monthly Fuel Monthly FY 08-09 Fuel FY 08-09 Inventory Inventory Purchases Inventory Inventory Purchases Inventory (Start) (End) (Month) (Change) (Start) (YTD) (Change) McKee Run (#6 Fuel Oil 364,838 416,831 53,210 51,993 426,048 536,660 (9,217) to #2 Fuel Oil) VanSant (#2 Fuel Oil) 111,496 110,948 0 452 99,950 56,801 10,998 Note: As measured by tank level instruments. Tank levels may change due to oil temperature. Note: * - #6 Fuel Oil was sold ( approx. 122, 000 gallons) and #2 Fuel Oil was purchased in October and December. Dover Monthly PGAM Report January 2009 - Final 29

Page 48

Capacity Testing – FY 2008-2009 Summer 2008 (June 1- Aug 31) Winter 2008-2009 (Dec 1- Mar 1) Unit Rated Net Reported Net Unit Rated Net Reported Net Capability (MW) Capability (MW) Capability (MW) Capability (MW) 1 17 17.09 1 17 17.3 2 17 17.55 2 17 17.9 3 102 102.72 3 102 Scheduled for 2/09 VanSant 39 40.09 11 40 40* Total 175 177.45 Total 176 74 Note: * depicts a unit that has not completed capacity test for the PJM Demonstration Period in FY 2008-2009 but has been accepted into the PJM Winter Capacity Test Exemption Program. Team Report: The operations teams continue to support maintenance. The teams have been involved in the construction of two new offices that used to be an old break room which is no longer being used. These two offices will help support the development of our management team in working together in the future. Teams continued training within the Plant Readiness Program (PRP) to keep their skills and knowledge of the plant up to date particularly when the generating units are off line or when they are not supporting maintenance activities. The GPI online training which supports our safety and environmental training are being used by the teams to complete their training as they begin the training cycle for the year 2009. GPI also has a number of courses that are used to support operator advancement and refresher training. Confined space program was updated and reviewed over this month resulting in indentifying more confined space areas. These areas were marked by signs or stickers by the operators. All the Senior Operators are preparing to take the PJM Systems Operator exam in February. There are several already scheduled for the exam and we anticipate all Senior Operators will all test in February. Operations staff updated waste profiles and satellite station signage to reflect the oil conversion from #6 fuel oil to #2 fuel oil. Dover Monthly PGAM Report January 2009 - Final 30

Page 49

4.0 Maintenance During the month of January, plant maintenance staff continued addressing the backlog of work orders. Sixty-two work orders were issued during the month, with eighty-five work orders being completed during the month. The table below summarizes the monthly work order activities. Work Order Report January - 09 Outstanding From Outstanding Previous Issued This Completed at the end of Priority # Months Month This Month the month P1 0 0 0 0 P2 5 10 10 5 P3 16 4 16 4 P4 41 29 27 43 P5 8 0 5 3 P6 0 0 0 0 P7 12 1 4 9 P8 0 0 0 0 P9 8 1 2 7 P6 - 1 0 0 0 0 P6 - 2 0 0 0 0 P6 - 3 0 0 0 0 P6 – 4 1 1 0 2 P6 – 5 0 0 0 0 P6 – 6 0 0 0 0 P6 – 7 0 0 0 0 P6 - 8 0 0 0 0 PM 33 16 21 28 Totals 124 62 85 101 Note: PM's are included in the priority totals Notable activities during the month include: 1). Installed new heat tracing for Unit Three down comer line to sample panel. 2). Completed several work orders that were initiated from the Areva Vibration Inspection report indicating possible mechanical problems. Some of the pieces of equipment that were identified in the report which needed further inspection or repairs were the Lube Oil Exhauster, 3B EHC Pump, Gland Steam Seal Exhauster and the Over Fire Air Motor. Follow up testing will be conducted in order to ensure the repairs corrected the problems. 3). Completed work orders from recent Storm Technologies Inspection report indentifying minor repairs or adjustments to equipment clearances. Dover Monthly PGAM Report January 2009 - Final 31

Page 50

4). The Plant Air System had been recently found to have water in the piping which caused critical equipment, such as FD Fan dampers, CEMS equipment, Ash system actuators and ash reinjection gate, not to operate properly due to moisture in the lines. After investigating the problem, it was found that the air dryer desiccant service life had expired requiring a change of the material. The desiccant was replaced and plant staff has continued to blow down the air lines in order to remove the remaining moisture in the lines. Presently, the plant air system is dry and plant equipment is now working properly. 5). Construction was started on remodeling the break room on the ground floor into two offices that will be used by the maintenance planner and maintenance supervisor in an effort to increase communication and worker productivity. 6). Slots were cut in the air register shrouds on each burner. After the slots were cut, the Beck drives were recalibrated for a stroke of 0 to 13.5 inches. This will help lower wind box pressure and aid in controlling combustion in the boiler. Dover Monthly PGAM Report January 2009 - Final 32

Page 51

5.0 Capital Improvement Projects (CIP) Project Description Update Number EG0801 MR Fire Progress: Project deferred to 2009 to investigate Protection an alternative technical approach. System Upgrades Schedule: Installation now projected to be June 2009 EG0804 MR Pollution Progress: Change out of fuel oil equipment has Remediation been completed. Plant in final stages of testing and Equipment tuning Unit 3. Units 1 and 2 have successfully made the conversion and successfully completed a Winter Period Capacity Test. Schedule: Additional testing scheduled for February and June 2009. EG0901 MR Unit 3 Progress: Complete Continuous Replacement was completed in October 2008. Emissions Monitor (CEM) EG0902 VS Unit 11 Progress: Complete Continuous Replacement was completed in October 2008. Emissions Monitor (CEM) EG0903 MR Unit 3 Progress: Complete Continuous Replacement was completed in November 2008. Opacity Monitor (COM) EG0904 MR & VS Arc Progress: Phase one will determine scope and Flash Analysis costs to implement which will provide input to cost benefit analysis/ justification to proceed with the second phase. Task statement defining the scope of work currently being developed Schedule: The initial phase of the project to be completed no later than June of 2009 and the second phase to complete in May 2010. Dover Monthly PGAM Report January 2009 - Final 33

Page 52

5.1 CIP Budget Project Description Original Budget Latest Number ($ X 1000) Estimate ($ X 1000) EG0801 MR Fire Protection System 50 50 Upgrades EG0804 MR Pollution Remediation 3800 2800 Equipment EG0901 MR Unit 3 Continuous 30 50 Emissions Monitor (CEM) EG0902 VS Unit 11 Continuous 30 50 Emissions Monitor (CEM) EG0903 MR Unit 3 Continuous 30 30 Opacity Monitor (COM) EG0904 MR & VS Arc Flash Analysis 125 75* * $50k removed and put into O&M budget The current total for Project EG0804 expensed to date is $1,366,511. The expenses for the month of January were $195,690. Dover Monthly PGAM Report January 2009 - Final 34

Page 53

6.0 General Plant Information Training The teams have been using our Plant Readiness Program (PRP) for training. The program is to keep our operations staff training level current at all times. Each day and night shift reviews different procedures for equipment operation, unit operation, and valving procedures. Included in the program are also different emergency scenarios that are simulated to ensure personnel are properly prepared to react should those situations actually occur. Plant staff has started the GPI training for safety and OSHA for the new year. These courses have to be completed by the end of the year and have to be repeated on an annual basis. Plant staff have also started an annual review of the Plant SMPs ( Safety Manual Procedures) for 2009 and have to be completed by the end of the year. PJM Instructors were on site the week of January 5th for training on the PJM Manuals and to aid in preparing plant staff to complete the Generation Systems Operator certification test. There approximately fourteen employees in the class, three of which are already certified. In attendance were Senior Operators, Auxiliary Operators, Operations Supervisors and one City of Dover Electric Department employee. This training also builds credits towards keeping your certification. This class gave current certified operators thirty-two hours worth of credits towards a required two hundred in five years to maintain their certification status. Aaron Jester passed the PJM certification exam on January 16th. He is our first operator to pass the exam other than management. Other operators are scheduled to take the exam in the coming weeks. Personnel The position of I,C/E Technician Applicant screening and the conducting preliminary interviews for the position of I,C/E Technician was completed and an employment offer has been given and accepted by Robert Gallucio. Dependent on medical screening, Mr. Gallucio is scheduled to start work on February 9, 2009. We like to congratulate Aaron Jester in being promoted to Senior Operator I Step I after many months of training and hard work. Aaron is now on “A” team due to only having one Senior Operator shift which allows for more flexibility and less overtime. Other Events The plant received confirmation from the DNREC that there was no additional work or documentation needed from the remediation work of the oil leak in and around the #1 Tank berm. A Dover Monthly PGAM Report January 2009 - Final 35

Page 54

condition required by DNREC in the case closure notice was that they (DNREC-AST Branch) are to be notified if any digging is to occur in or around the tank or tank berm area. During the month of January, the plant experienced a recordable accident when an operator sprained his ankle when he slipped and fell while making rounds. The accident occurred when the employee was walking on an ice patch that was covered by a layer of snow. There was no lost work time pertaining to the incident as the employee was assigned other duties still within his existing work description. Until the time of the accident, the plant had completed 1,392 days without a recordable accident. The station continues to work on compliance with NERC and RFC standards for Generator Operator (GOP). In January, Ken Beard and Dean Blaha (NAES) met with Jeremy Johnson and Steve Enss, City of Dover employees, to ensure both entities remain in NERC compliance and to share notes on file maintenance and data. Preliminary discussions continue with Pace Global and Applied Power Projects on the addition of a HRSG at VanSant which could supply additional power output on the unit. Next on the agenda is to have a discussion with a Chevron site, which had incorporated the same Chang Cycle technology several years ago to learn more about the pros and cons of such a project. The conference call is scheduled for early February 2009. Calendar of Events Date McKee Run Units 1, 2 and 3 Outage – Oil Conversion Project October 1, 2008 – December 31, 2008 McKee Run Unit 3 Maintenance Outage for air flow and controls January 26-February 2, 2009 tests McKee run Unit 3 Net Capability test February 20, 2009 (tentative) PJM Winter Capacity Demonstration Period December 1, 2008 – February 28, 2009 EIA Reporting Requirements February 1, 2009 Title V Annual Certifications Due February 1, 2009 Sara III/Tier II Reporting Due March 1, 2009 Annual SO2 Certification Due March 1, 2009 Unit 3 Annual Outage March 9 -23, 2009 Annual Emission Statement Due April 1, 2009 Appendix E Testing for Units 1 and 2 June, 2009 Unit 3 RATA Testing and Particulate Testing June, 2009 Unit 11 Appendix E Testing June, 2009 Fiscal Year Ends June 30, 2009 Dover Monthly PGAM Report January 2009 - Final 36

Page 55

7.0 Summary of NAES Performance to Date Plant Performance FY 2008-2009 Measure Month Year to Date YTD FY Maximum Incentive Incentive Commercial Unavailability (CU) 0% 0% $85,863 $85,863 Safety 1 1 $8,050 $16,099 Environmental 0 0 $16,099 $16,099 Capacity Tests Summer Winter Summer Winter Completed Unit 1 No Yes Yes Yes $3,220 $3,220 Unit 2 No Yes Yes Yes $3,220 $3,220 Unit 3 No No Yes No $9,660 $19,319 Unit 11 No Yes* Yes Yes* $6,440 $6,440 Total YTD Total YTD 88.21% $132,551 $150,261 Incentive % Incentive Note: * depicts a unit that has not completed capacity test for the PJM Demonstration Period in FY 2008-2009 but has been accepted into the PJM Winter Capacity Test Exemption Program signifying completion of test. Dover Monthly PGAM Report January 2009 - Final 37

Page 56

APPENDICES I. PJM INVOICE BREAKDOWN The PJM bill is a record of all Electricity Transactions, Transmission Services, Ancillary Services and Miscellaneous fees that allow the PJM to operate. Below is a list of the line items on the PJM bill including all generator activity. PJM Bill Line Items Gen Load Net Day Ahead Energy $0.00 ($575,405.12) ($575,405.12) Realtime Energy $0.00 ($92,386.60) ($92,386.60) Transmission Losses Credits $0.00 $104,223.17 $104,223.17 Network Integration Transmission Service Charges $0.00 ($248,958.52) ($248,958.52) Inadvertent Interchange Charges $0.00 ($70.83) ($70.83) Regulation Charges $0.00 ($26,357.47) ($26,357.47) Synchronized Reserve Charges $0.00 ($3,639.66) ($3,639.66) Balancing Operating Reserves Charges $0.00 ($5,475.02) ($5,475.02) Day Ahead Operating Reserves Charges $0.00 ($7,711.31) ($7,711.31) Day-ahead Scheduling Reserve $0.00 ($376.57) ($376.57) Synchronous Condensing Charges $0.00 ($1,259.34) ($1,259.34) Reactive Services Charges $0.00 ($5.12) ($5.12) Meter Correction Charges $0.00 ($12.00) ($12.00) Day-ahead Economic Load Response Program Charges $0.00 $0.00 $0.00 Real-time Economic Load Response Program Charges $0.00 $0.00 $0.00 Balancing Operating Reserves Credits $0.00 $0.00 $0.00 Day Ahead Operating Reserves Credits $0.00 $0.00 $0.00 Locational Reliability Charges $0.00 ($928,450.00) ($928,450.00) Capacity Transfer Rights Credits $0.00 $32,628.12 $32,628.12 Capacity Resource Deficiency Credits $0.00 $1,862.17 $1,862.17 Demand Response and ILR Compliance Penalty Credits $0.00 $0.00 $0.00 RPM Auction Credits $765,406.12 $0.00 $765,406.12 Auction Revenue Rights Credits $0.00 $75,373.09 $75,373.09 Synchronized Reserve Credits $0.00 $0.00 $0.00 PJM Scheduling System Control and Dispatch Service Charges $0.00 ($13,845.30) ($13,845.30) Transmission Owner Scheduling System Control and Dispatch Service Charges $0.00 ($4,942.06) ($4,942.06) Reactive Supply and Voltage Control from Generation Sources Service Charges $0.00 ($23,161.47) ($23,161.47) Black Start Service Charges $0.00 ($1,205.39) ($1,205.39) North American Electric Reliability Corporation (NERC) Charge $0.00 ($452.30) ($452.30) Reliability First Corporation (RFC) Charges $0.00 ($578.68) ($578.68) Expansion Cost Recovery Charges $0.00 ($431.52) ($431.52) Transmission Enhancement Charges - 2008 $0.00 ($8,105.60) ($8,105.60) Black Start Service Credits $5,728.89 $0.00 $5,728.89 Non-Firm Point-to-Point Transmission Service Credits $0.00 $3,529.74 $3,529.74 Generation Deactivation $0.00 $0.00 $0.00 Market Monitoring Unit (MMU) Funding $0.00 ($357.79) ($357.79) Organization of PJM States, Inc. (OPSI) Funding $0.00 ($41.91) ($41.91) FERC Annual Recovery $0.00 ($3,711.53) ($3,711.53) Amount Due for Interest on Past Due Charges $0.00 ($62.30) ($62.30) PPA $0.00 $7,428.69 $7,428.69 $771,135.01 ($1,721,958.43) ($950,823.42) Dover Monthly PGAM Report January 2009 - Final 38

Page 57

II. LOAD, ALL IN ENERGY AND ALL IN COST OF SERVICE TABLE Budget Load Actual Load Budget AIE Actual AIE Actual YTD AIE Budget AICS Actual AICS Actual YTD AICS (MWh) (MWh) ($/MWh) ($/MWh) ($/MWh) ($/MWh) ($/MWh) ($/MWh) Jul 81,189 81,060 $92.30 $94.46 $94.46 $94.85 $97.04 $97.04 Aug 82,798 73,039 $92.29 $91.36 $92.99 $101.51 $101.39 $99.10 Sep 67,000 66,214 $85.81 $89.01 $91.80 $93.47 $95.27 $97.89 Oct 61,170 58,391 $87.47 $87.60 $90.92 $96.39 $97.90 $97.82 Nov 58,037 56,361 $87.62 $85.62 $90.02 $96.60 $93.43 $97.08 Dec 59,534 61,078 $87.25 $85.03 $89.25 $97.05 $98.21 $97.26 Jan 64,805 65,021 $88.79 $88.78 $89.19 $101.90 $99.99 $97.65 Feb 63,547 $89.48 $77.20 Mar 58,753 $86.98 $95.92 Apr 56,824 $85.94 $96.34 May 62,655 $85.52 $93.92 Jun 72,496 $88.32 $100.05 Dover Monthly PGAM Report January 2009 - Final 39

Page 58

III. GLOSSARY All In Unit Energy Cost ("AIE") accounts for the wholesale energy costs excluding capacity obligations, capacity credits for Dover-owned generation, generation revenues, generating plant costs, the black start ancillary services credit for the Van Sant plant, and revenues associated with the sale of emission allowances. The AIE includes the costs from settling the hedged or forward transactions; the energy bought on the ISO (Independent System Operator or PJM) day-ahead to cover the open position (un-hedged); load following costs associated with balancing the actual load in the ISO real-time market; energy management service related fees; the ISO transmission charges and credits to load serving entities; the ISO ancillary services charges such as generation regulation, spinning reserve, and reactive power; and the ISO administrative charges and cost of service recovery fees. All In Cost of Service ("AICS") accounts for the net cost of wholesale power to the City of Dover Electric Utility. The AICS starts with the AIE and adds the costs or credits from capacity obligations, capacity credits for Dover-owned generation, generation revenues, generating plant costs, the black start ancillary services credit for the Van Sant plant, and revenues associated with the sale of emission allowances. Black Start is a generating ancillary service that is the process of restoring a generating plant to service without the support of an external power supply to power auxiliary equipment needed for start up operations. Capacity UCAP Obligated Purchased is the obligation and payment by all load serving entities in PJM including Dover for the Unforced Capacity (UCAP) requirement from PJM that satisfies the PJM reserve requirements. Generation Capacity Credit: is the credit provided to generators for supply capcity to the system. The price is determined by the PJM Reliability Pricing Market auction process that includes three auctions for each capacity year. Generation Production Margin accounts for the variable margin excluding variable O&M and emissions. The Generation Production Margin is calculated by taking the PJM revenues credited to the plant including any balancing charges or credits less the fuel costs. Generation Production Margin includes both “Economic and reliability dispatch” and “Testing.” Economic and reliability dispatch equals the margin achieved when Dover’s generating plants are dispatched by PJM for either economic dispatch (the system energy price is greater than the Dover bid price) or reliability dispatch whereby PJM pays the generating cost of the plants for the hours the plant is run to support the system. Generation Testing equals the Generation Production Margin associated with testing. This is usually expected to be a negative margin because the plant is potentially being dispatched / run when energy prices do not cover its costs. Non-Production Revenue equals the credits from PJM to Dover for Generation Capacity Credit, the Black Start Revenue and the sales by Dover of Emission Allowances. Dover Monthly PGAM Report January 2009 - Final 40

Page 59

McKee Run Station Pollution Remediation Project Purpose: This project consists of activities which will reduce emissions of NOx and SOx at the McKee Run Generating Station in supporting the goals of the Delaware Regulation 1146. Project Scope Expected Benefit 1. Stop the burning of residual Reduce SOx and NOx emissions as a result of fuel oil and convert the plant to lower content of fuel bound sulfur and nitrogen. burning low sulfur distillate oil Reduce particulate emissions due to the lower along with natural gas. particulate content in the distillate fuel oil 2. Replace necessary fuel oil Required to store, transport and burn the low sulfur system equipment and perform distillate fuel oil. modifications needed to burn the low sulfur distillate oil. 3. Modify boiler controls on Unit Provides flexibility to “tune” the combustion 3 to improve the combustion process in order to minimize the thermal production process of NOx Progress to date: • Residual oil removed from the storage tank and replaced with distillate oil • All fuel oil system modifications and equipment replacements completed • Planned boiler control modifications on Unit 3 completed • All Units successfully test operated burning the low sulfur distillate oil. Conditions found/ problems encountered: • Condition of the fuel oil unloading piping to the oil tank required a section of piping to be replaced which was not anticipated. No other issues were found or encountered during the fuel oil system modifications and equipment replacement activities. • Repairs to the flue gas system of Unit 3 not anticipated were completed. Activities remaining: • Boiler control tuning for optimizing of the combustion process • Boiler performance testing to determine emission limits • Flue gas system improvements for combustion will be completed during an upcoming planned maintenance outage scheduled for March. Budget Status : • The approved budget for this project is $3.2 Million. • Current estimate at completion is $3.1 Million