Page 1
ATTACHMENT #1
Special SA&T Committee Meeting of 12/01/2008
DE 8 Concept Plan and
Operations Study
City of Dover Safety Advisory and
Transportation Committee Meeting
December 1, 2008
Page 2
Purpose
Develop a concept plan describing the aesthetic qualities of
the corridor as a gateway to Dover
Analyze and recommend improvements to address current
and future operational problems
Create an action plan to address future growth in the
corridor and the associated transportation impacts.
Develop a document that DelDOT can use to start the
project development process for implementing
recommendations
Delaware 8 Concept Plan and Operations Study
Page 3
Study Limits
Delaware 8 Concept Plan and Operations Study
Page 4
Methodology
Establish Existing Conditions
Conduct Traffic Analysis
Develop a Purpose and Need Statement
Develop Concepts and Alternatives
Prepare a Technical Memorandum
Delaware 8 Concept Plan and Operations Study
Page 5
Alternatives Analysis
Improvements included in all alternatives:
– Realign Artis Dr. to 90º intersection
– Two access points to proposed high school
– New road connectors: to Hazlettville Rd., Artis Dr. and
Chestnut Grove Rd
– Change to protected-only left turn signals
– Add eastbound right turn storage lane at Mifflin Rd.
– Add on-road bike lane through all intersections
– Add six foot shoulders from Saulsbury Rd. to Gibbs Dr.
Delaware 8 Concept Plan and Operations Study
Page 6
Alternatives Analysis
Improvements included in all alternatives
(cont.):
– Install cross walks, handicap ramps and pedestrian
signals at all signalized intersections
– Improve existing shared use path on north side of DE 8
and extend from Kenton to Mifflin Rd.
– New connection McDonald’s and Arby’s
– Add outside shoulders on DE 8 from Mifflin to
Saulsbury
– Incorporate landscaping & streetscaping elements into
plan
Delaware 8 Concept Plan and Operations Study
Page 7
Alternatives Analysis
Improvements Considered – Two Alternatives:
– Shared-use path vs. sidewalks from Artis Dr. to Mifflin
Rd.
– Landscaped median vs. center turn lane from west of
Mifflin Rd to Saulsbury Rd.
– Widening the Kenton Rd. intersection vs. connector to
Independence Blvd.
– Widening the Saulsbury Rd. intersection vs. additional
connector roads on the south side of DE 8
– Roundabout vs. traffic signal at DE 8 and Weston Dr.
– Do nothing (no-build)
Delaware 8 Concept Plan and Operations Study
Page 8
Preferred Alternative
Delaware 8 Concept Plan and Operations Study
Page 9
Preferred Alternative
All common improvements
Reconfigure entrance to Brandywine Apartments
Pedestrian crossing at Forest Street
Shared-use path from Artis Dr. to Mifflin Rd.
Landscaped median from Mifflin Rd to Saulsbury Rd.
Connector Kenton Rd. to Independence Blvd.
Widening the Saulsbury Rd. intersection and additional
connector roads on the south side of DE 8
Traffic signal at DE 8 and Weston Dr
Delaware 8 Concept Plan and Operations Study
Page 10
DE 8 Corridor
Delaware 8 Concept Plan and Operations Study
Page 11
DE 8 Corridor
Delaware 8 Concept Plan and Operations Study
Page 12
DE 8 Corridor
Delaware 8 Concept Plan and Operations Study
Page 13
Completed Final Steps
Agency and Public Review
Incorporate Comments and Changes
Issue Report
Delaware 8 Concept Plan and Operations Study
Page 14
Next Steps
Begin Implementation
Include Elements of the Plan in the long
range Regional Transportation Plan
Include Appropriate Elements in the shorter
range Transportation Improvement Plan
Delaware 8 Concept Plan and Operations Study
Page 15
ATTACHMENT #2
Special SA&T Committee Meeting of 12/01/2008
Special SA&T Committee Meeting of 12/01/2008
ATTACHMENT #2
Page 16
ATTACHMENT #3
Special SA&T Committee Meeting of 12/01/2008
Dover/Kent
County MPO
Special SA&T Committee Meeting of 12/01/2008
ATTACHMENT #3
Page 17
Dover/Kent
What is a Regional Long-Range
County MPO Plan (RTP)?
• RTP is a
comprehensive
strategy for transportation
and development in a region
• It is required by USDOT
as a prerequisite for
funding
• Vision of everyone in the
region drives the RTP
• The RTP is a collaborative
process involving state,
county and local officials as
well as input from the
public
Page 18
Dover/Kent
County MPO
Issues Facing the Region
• Increasing demands put on the transportation
system due to the substantial population
growth (predicted to be over 20 percent by 2010)
• Kent County has an aging population thereby
increasing demand on services for the elderly
• Congestion in the county is predicted to get
significantly worse by 2030 as traffic out-paces
roadway capacity
• Low density development making it difficult to
provide additional transit in the region
• With limited funds the need to prioritize projects
is essential
Page 19
Dover/Kent Underlying Strategies of the Plan
County MPO
• Five fundamental
strategies form the
framework of the RTP
• These strategies were
developed to ensure
that investments are
made to support the
vision of this RTP
• Preserving and
Maintaining the
existing system is
a priority
Page 20
Dover/Kent
County MPO
Congestion
• If development continues as is and only currently
planned projects are implemented, the congestion
will worsen on most north-south routes and some
east-west roads
2005 Congestion 2030 Congestion
Page 21
Dover/Kent
County MPO
TIP: 2009-2012
• What is currently planned for projects?
Page 22
Dover/Kent
County MPO
Major Dover Projects
Page 23
Dover/Kent
County MPO
Major Dover Projects
• North Dover Study
“Consensus Plan
– On the Handout