This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
ATTACHMENT #1
SA&T Committee Meeting of 03/25/2008
CITY OF DOVER
TRANSPORTATION PROJECTS PRIORITIZATION
Recommended by the SA&T Committee on March 25, 2008
1. Intermodal Transportation Terminal (Bus Station)
2. West Dover Connector
A. West Street Traffic Flow
3. Kenton Road Corridor Upgrades
4. Loockerman Street / Forrest Avenue Improvements
5. College Road Corridor Upgrades
6. U.S. 13 Sidewalk Construction
7. Crawford Carroll Avenue Extension
8. US Route 13 Service Road Corridor Study
9. Route 8 Corridor Study
Policy/Program Prioritization List
1. Weekend Bus Service
2. Air Passenger Travel
3. Red Light Photo Enforcement Program
4. Bike Path Connectivity
/jg
C:\Documents and Settings\Mommy\My Documents\City\Minutes\Attachments and Exhibits\2008\03-25-2008 SA&T\Transportation Prioritization.wpd