Special SA&T Committee Meeting of 02/05/2008
Dover/Kent County MPO - List of Unfunded Proposed Projects
YEAR SUBMITTED ADOPTED RATING
Project Description
Adopted Priorities
US 13/Division St. Intersection Improvement and Pedestrian Crossing, Dover - Increase safety and reduce
2008
congestion. This project was previously just a pedestrian crossing
US 13/Loockerman St. Intersection Improvement and Pedestrian Crossing-Reduce congestion and create a 2008
pedstrian crossing at US 13 and Loockerman St. This project was previously just a pedestrian crossing.
SR 8 between Cranberry Run and Marsh Creek Lane - Currently the large subdivisions of Cranberry Run,
Heatherfield and Marsh Creek have internal sidewalks and are west of the existing sidewalks along SR 8. The 2007 2.82
installation of sidewalks along SR 8 would p
Crawford Carroll Avenue, Dover - Extend Crawford Carroll Avenue south through DSU campus to the new
2006 2.53
Dover Civic Center.
Kenton Road Corridor Upgrade, Dover - Upgrade corridor from Rte 8 to Dennys Road to an urban road standard.
Improvemtments to include new pavement sections, sidewalks, shoulders, closed drainage systems, bicycle lanes, 2006 2.43
lighting, transit improvemnts and ot
North Dover Exit SR 1, Dover - This proposed project is for the construction of a dedicated EZPass lane with
2006 2.33
better markings at the North Dover SR 1 southbound ramp.
US 13 Wayfinding Signs, Dover -Install overhead signs for major intersections along US 13 in Dover that inform
2006 2.18
the travelling public of the current cross street and distance to the next major cross street
Tar Ditch Storm Drainage System, Dover - This project request the installation of a second 66 inch diameter
Reinforced Concrete Storm Drainage Pipe adjacent to the existing stormwater pipe to alleviate flooding on New 2006 2.10
Street after rain.
College Road Corridor Upgrade, Dover - upgrade the College Road corridor from Kenton Road to Saulsbury
Road to an urban road standard. Improvements to include new pavement section, sidewalks, shoulders, closed 2005 2.65
drainage system, bicycle lane, lighting and o
Pedestrian Crossing at US 13/Leipsic Road, Dover - Add pedestrian push buttons, striped crosswalks and lighted 2003 2.05
sign panels to the US 13 North and Leipsic Road approaches, and sidewalk where necessary.
Webb's Lane Bike/Ped Improvements, Dover - Provide sidewalks along Webbs Ln. and handicapped ramps and a
1999 2.47
pedestrian signal at US 13
Dover Transit Hub - Construct a transit transfer facility that allows transfer between DART and intercity bus
service and local taxi service. Property for this facility has been purchased by DelDOT at West and Water Streets.
Evening Transit Service - Operate fixed-route transit service in the Dover area after 6:00 PM
May 2007 1
Page 2
FY 2008 Tranportation Improvement Program - Priortized List of Projects in draft FY 2008 Capital Transportation Program
YEAR SUBMITTED ADOPTED RATING FUNIDNG YEAR
Project Description
Projects
Governor's Avenue , Webb's Lane to Water Street, Dover - Possible improvements that include the
construction of gutters and curbs, sidewalks, closed drainage, shoulder construction, bridge replacements 1996 2.83 2009
and intersection improvements at Water St; striping a
Wyoming Mill Road Realignment, Dover - Realign road to create a signalization intersection at the
entrance of the Village of Westover (Westover Drive). The project should include bike/pedestrian 2006 2.72
facilities, closed drainage system, signalization and miscel
SR1, Bay Road / SR9, Bayside Drive, Intersection Improvements - Construct a grade-separated
2005 2.72 2009
intersection at SR 1 and SR 9 with tie-ins to Kitts Hummock Road (K 68).
Loockerman Street and Forest Street Transportation Enhancement, Dover - Project will provide a
sidewalk around the island at Forest St. and Division intersection; widened the intersection to provide 2002 2.52 2014
median for landscaping; construct a round at Railroad St
US 13 Pedestrian Improvements Court Street to Denneys Road, Dover - Construct sidewalks on
both sides of the road, where possible, provide pedestrian crossings at signalized intersections. Provide 1997 2.52 2011
pedestrian signals at crossings.
West Dover Connector, Dover - Develop a concept plan for the continuation of Saulsbury Road 2003 2.10 2009-2012
through to New Burton Road as a means for relieving traffic congestion on the west side of Dover.
Dover Signal & Intersection Upgrades - Upgrade existing traffic light control systems in Central
Dover with demand activated, computer controlled signals for improved circulation - 18 intersections, 1999 2.14 2008-2009
including Loockerman St.
Clarence St. Extension - Extend Clarence St. in Dover to connect with Forrest Ave. 2001 2.29
Saturday Transit Service - Operate fixed-route transit in the Dover area on Saturdays. 2008
March 16, 2007 1