UTILITY COMMITTEE
AGENDA
REVISED
September 24, 2007 - 5:00 P.M. - Council Chambers - City Hall - City of Dover
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-m ail at Tm cdowell@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Proposed Amendments to the City of Dover Electric Service Handbook - Proposed Increases
for Residential and Commercial Underground Extension Fee
2. Revised CIP's for 69KV Feeders 3 & 4 and St. Jones Substation
3. Bid Evaluation - Two (2) Substation Transformers
4. FY 07/08 Water/Wastewater Capital Improvement Project (CIP) Briefing (Continued from
September 10, 2007 Meeting)
5. Modification of Maintenance Agreement - Persimmon Park Place Islands
6. Update - Verizon Franchise Agreement Negotiations
7. Adjournment by 6:00 P.M.
/tm
S:\ClerksOffice\Agendas&Minutes\Committee-Agendas\2007\09-24-2007 UTILITY Revised.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
ACTION FORM
PROCEEDING: Utility Committee AGENDA ITEM NO: 09/24/2007
DEPARTMENT OF ORIGIN: Public Utilities – Electric Engineering DATE SUBMITTED: 08/23/2007
PREPARED BY: Ronald H. Lunt, Public Utilities Director
SUBJECT: Proposed Increase for Residential and Commercial Underground Extension Fee
REFERENCE: Electric Service Handbook Division III, Rules and Regulations, Section 3-36
RELATED PROJECT: N/A
APPROVALS: City Manager, Finance Director
EXHIBITS: Detailed Development Evaluation
EXPENDITURE REQUIRED: $N/A AMOUNT BUDGETED: $N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: To become effective upon Council’s approval.
RECOMMENDED ACTION: Staff recommends increasing the Residential Underground Extension Fee
from $850 per service to $1,200 per service. Additionally, staff recommends increasing the Commercial and
Industrial Underground Extensions from $850 per electrical service to total material cost recovery.
BACKGROUND AND ANALYSIS
In September, 2006, the Electrical Engineering Division chose three reflective developments to study and
developed a material list for the equipment needed to supply electrical service to these developments. From that
study a “per lot” fee was developed to recover all the City supplied material costs and included in the City of
Dover Electric Service Handbook, which currently requires an $850 residential underground extension fee (per
lot) for new developments and/or extension requests. The $850 fee recovered the material and transformer
costs of the new electrical distribution extension; it does not include labor. The fees in the Handbook also
applied the same rate to Commercial and Industrial extensions where more than one customer was served.
Due to the rising cost of material, staff felt it was necessary to re-evaluate the fee’s associated with providing
the infrastructure for underground electric service extensions. The result of this re-evaluation, which used the
same material lists as the 2006 study, is that the average cost for providing residential electric service is
approximately $1,200 per service. Staff is also recommending that the Commercial and Industrial underground
extensions be modified to recover 100% electrical material costs for all installations.
New Development - Estimated Material Costs (July 2007) Average Cost
Development Year Material Cost Transformer Cost Total Material Cost No. of Lots Per Lot
2006 $ 190,377.59 $ 45,888.00 $ 236,265.59 212 $ 1,114.46
Nottingham Meadows 2007 $ 240,106.56 $ 65,019.81 $ 305,126.37 212 $ 1,439.28
2005 $ 31,388.11 $ 11,792.81 $ 43,180.92 81 $ 533.10
Stone Ridge Dev 2007 $ 37,588.80 $ 13,065.61 $ 50,654.41 81 $ 625.36
2005 $ 166,154.46 $ 52,710.18 $ 218,864.64 303 $ 722.33
Clearview Meadows Dev. 2007 $ 275,849.56 $ 80,255.57 $ 356,105.13 303 $ 1,175.26
Pre-2007 Average per lot, material & transf. cost only 596 $ 836.09
2007 Average per lot, material & transf. cost only 596 $ 1,194.44
Page 3
Text depicted with strikeout will be omitted.
Text depicted with bold italic is proposed.
3-36. Underground Extensions
a. Residential.
The City will install underground extensions of primary, secondary and services (subject to Rules and
Regulations of Underground Services) to serve customers in new developments. The developer will be required
to install, at its expense, conduits, equipment and pads The developer will be required to provide and install, at
their expense, all conduit(s), and install, at their expense, all equipment and pads (for example manholes,
transformer pads, etc.) as designed by the City’s Engineering Department. In addition, a fee of $850 $1,200
per platted lot is required.
The City will examine request for underground extensions individually in areas other than those
planned initially for underground.
b. Commercial and Industrial.
The City will install underground extensions on or along public right-of-way or on a right-of-way on
private property to serve more than one customer only one or more customers in areas where the existing
distribution system is underground or an underground system is planned. The developer will be required to
install, at their expense, conduits and equipment pad The developer will be required to provide and install, at
their expense, all conduit(s), and install, at their expense, all equipment and pads (for example manholes,
transformer pads, etc.) as designed by the City’s Engineering Department. In addition, reimbursement a fee of
$850 100% of the cost of materials, including all equipment and transformers, per platted lot electrical
service is required.
Note: Secondary services shall continue to be installed and maintained by the customer from the City’s point
of connection, such as the transformer or pedestal, to the customers meter socket, disconnect, CT cabinet or
other mutually agreeable device located at the property line or mutually agreeable location.
Page 4
ACTION FORM
PROCEEDING: Utility Committee AGENDA ITEM NO.: 09/24/2007
DEPARTMENT OF ORIGIN: Public Utilities – Engineering Dept. DATE SUBMITTED: 09/07/2007
PREPARED BY: Ronald Lunt – Public Utilities Director
SUBJECT: Revised CIP’s for 69 Kv Feeders 3 & 4 and St. Jones Substation
REFERENCE: NA
RELATED PROJECT: NA
APPROVALS: City Manager, Finance Director
EXHIBITS: Revised CIP forms
EXPENDITURE REQUIRED: NA AMOUNT BUDGETED: NA
(AS PER ATTACHED REVISED CIP SHEET)
FUNDING SOURCE (Dept./Page in CIP & Budget): NA
TIMETA BLE: Complete projects by the end of Fiscal Year 2009.
RECOMMENDED ACTION: Approve the changes in scope, schedule, and expense related to the CIP’s for
St. Jones Substation and 69 Kv Feeders 3 & 4.
BACKGROUND AND ANALYSIS
At the July 23, 2007, Utility Committee Meeting the Public Utility Director briefed the Committee on the
changes to the scope of the 69 Kv Feeder project, which included constructing it as a design/build vs. a EPC and
reducing it to two phase project vs. three phases. It was also discussed that the St. Jones Substation project
would need to be accelerated to coincide with the 69 Kv Feeders 3 & 4 – Phase II construction. Since this
briefing, staff has been preparing a detailed budget for both projects in an effort to update the CIP’s with
reliable cost estimates. Furthermore, a stipulation of the bond sale mandates that all funds be spent within three
years of the bond sale, the acceleration of the St. Jones Substation project will assist in complying with this
requirement.
As anticipated, the change is scope to the 69 Kv Feeder project will result in a saving of approximately
$2,525,410. The St. Jones Substation project costs have increased due to increases in the price of metals, the
switchgear, and related equipment. In FY 06 the project had been estimated to be 5.1M, it was reduced to 3.6M
in FY 07 based on a temporary reduction in actual bid costs. The current estimates for the Substation are
projected to be approximately 5.3M. The total costs related to the two projects are projected to be $17,598,158,
a net reduction of $749,342 over previous FY07 estimates.
Budget Amendments reflecting these changes will be prepared for approval as part of the first planned Budget
Amendment.
Page 5
69 KV Feeders 3 and 4 LOCATION & AREA MAP:
FISCAL YEAR: 2006 - 2009
PROJECT NO.: EE0601
FUND:
DEPARTMENT: Public Utilities – Electric Engineering
NEW PROJECT?: NO
DEPT. RANKING: 3
PROJECT DESCRIPTION: This project will install two new 69 Kv circuits starting at the Cartanza Substation and
interconnecting with our existing 69 Kv network near Fulton and West Street. The completion of this project will provide
redundancy to the existing transmission system and allow any one of the four transmission lines to be taken out of service
due to a component failure, or for maintenance, without causing a large scale outage. Additionally, it should be able to
supply future transmission capacity for at least 20 years. The project will be completed in two phases. Phase I of this project,
with construction beginning in the spring of 2008, will build two new circuits to the St. Jones Substation location (located at
the intersection of Kings Hwy. and Division Street); while it will not provide any interconnection or service at this location, it is
an electrically appropriate mid-point in the project. Phase II of the project will begin in the fall of 2008 and continue the
double circuits from St. Jones Substation to a point near Fulton and West Street where they will interconnect with our existing
lines. Phase II also includes installing approximately four spans of transmission line at North Street, near the railroad tracks
and the remove of obsolete lines along North Street near the Enterprise Industrial Park.
NEED, JUSTIFICATION, BENEFIT: The existing two lines from the Cartanza Substation carry the entire system load. If one
line should fail due to weather, accidents, or equipment failure during peak loading times approximately 50 percent of the
electric customers would be out of power until the failure was resolved. Additionally, the current transmission lines share the
same poles for approximately the first mile, if one of these support structures were to be knocked down, the entire City would
be without power until the generation could be started and could take approximately ten hours before restoration would be
completed. The addition of the two new circuits will provide a diverse path and double the transmission capacity.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: As previously discussed, prolonged, widespread
outages on the transmission system and/or the operation of generation at a substantial economic loss during transmission
maintenance (approximately $1M in FY07).
THIS PROJECT IS RELATED TO THE FOLLOWING: St. Jones Substation
EXPLANATION OF IMPACT ON OPERATING BUDGET: NA
TIME-LINE/CURRENT STATUS: Started in FY 06 and completed in FY 09.
COMMENTS:
FIVE-YEAR COST BREAKDOWN SCHEDULE:
Prior to 2008 FY 2008 FY 2009 FY 2010 FY 2011 After 2011 TOTAL
Planning and Design 197,332 854,975 304,000 1,356,307
Land
Construction 8,602,813 2,262,970 10,865,783
Miscellaneous Equipment
Other
TOTAL 197,332 9,457,788 2,566,970 $12,222,090
FINANCING:
Prior to 2008 FY 2008 FY 2009 FY 2010 FY 2011 After 2011 TOTAL
Electric Bond Proceeds 197,332 9,457,788 2,566,970 12,222,090
TOTAL 197,332 9,457,788 2,566,970 $12,222,090
IMPACT ON OPERATING BUDGET:
Prior to 2008 FY 2008 FY 2009 FY 2010 FY 2011 After 2011 TOTAL
TOTAL
Page 6
St. Jones Substation LOCATION & AREA MAP:
FISCAL YEAR: 2008 - 2009
PROJECT NO.: ES0004
FUND:
DEPARTMENT: Public Utilities – Electric Engineering
NEW PROJECT?:
NO
DEPT. RANKING:
PROJECT DESCRIPTION: This project will replace the current St. Jones Substation in coordination with the new 69 Kv
Feeders 3 & 4 project. The new station will consist of a bus tie for the two new 69 Kv circuits, installation of a new
transformer and switchgear to replace the existing obsolete equipment, and converting the last 22 Kv substation to 69 Kv.
NEED, JUSTIFICATION, BENEFIT: The installation of the bus tie will provide additional reliability to the transmission
system by providing a protection scheme for line faults, allow the interconnection of the two new feeders at this location to
provide greater reliability, and provide a dual transmission feed, with protection/isolation, to ensure that the substation
continues to operate in instances where the transmission line fails. The current station transformer and equipment have
reached their life expectancy and need to be replaced; therefore, this is an ideal time to convert the station to the 69 Kv
system. This will facilitate the removal of approximately 6 miles of 22 Kv transmission lines, which will reduce the
maintenance requirements and system losses.
CONSEQUENCES OF DELAYING OR ELIMINATING THIS PROJECT: We would not be able to complete Phase II of the
69 Kv project, update the obsolete equipment, or remove the 22 Kv transmission system.
THIS PROJECT IS RELATED TO THE FOLLOWING: 69 Kv Feeders 3 & 4
EXPLANATION OF IMPACT ON OPERATING BUDGET: NA
TIME-LINE/CURRENT STATUS: Design and material procurement in FY 08, construction to begin in the fall of 2008 with
completion scheduled for June of 2009.
COMMENTS: This is a revised CIP due to the revision of the 69 Kv Feeders 3 & 4 to only two phases and to ensure that
the bond funds are expended in three years.
FIVE-YEAR COST BREAKDOWN SCHEDULE:
Prior to 2008 FY 2008 FY 2009 FY 2010 FY 2011 After 2011 TOTAL
Planning and Design $333,760 $134,840 $468,600
Land
Construction $1,832,279 $3,075,189 $4,907,468
Miscellaneous Equipment
Other
TOTAL $2,166,039 $3,210,029 $5,376,068
FINANCING:
Prior to 2008 FY 2008 FY 2009 FY 2010 FY 2011 After 2011 TOTAL
Electric Bond Proceeds 2,166,039 2,690,907 $4,856,946
Depreciation Reserve 519,122 519,122
TOTAL $5,376,068
IMPACT ON OPERATING BUDGET:
Prior to 2008 FY 2008 FY 2009 FY 2010 FY 2011 After 2011 TOTAL
TOTAL
Page 7
PROCEEDING: Utility Committee AGENDA ITEM NO.: 09/24/2007
DEPARTMENT OF ORIGIN: Public Utilities – Electric DATE SUBMITTED: 09/07/2007
PREPARED BY: Ronald H. Lunt – Public Utilities Director
SUBJECT: Bid Evaluation: St Jones & Horsepond Substation Transformer
REFERENCE: BID # 08-0004DPU
RELATED PROJECT: 69 Kv Feeders 3 & 4
APPROVALS: City Manager and Finance Director
EXHIBITS: Shaw Bid Evaluation Summary
EXPENDITURE REQUIRED: $1,615,481 AMOUNT BUDGETED: See Explanation Below
FUNDING SOURCE (Dept./Page in CIP & Budget): #1) 2007/2008 City of Dover Draft Budget,
Page 150, Public Utilities – Electric Engineering, Horsepond 600 Transformer: Account #487-8300-
563-70-27, Project EE0803, budget $1,020,000, expense of $807,740.50. #2) Amended CIP Sheet
and subsequent Budget Amendment for St. Jones Substation being proposed with a FY2007-08
Budget of $1,832,279 and expense of $807,740.50.
TIMETABLE: Unit will be ordered upon Council approval and will ship approximately 46 weeks after
order.
RECOMMENDED ACTION: Staff recommends awarding the proposal to the lowest responsive
bidder, Kuhlman Electric Corporation, in the amount of $1,615,481 which includes 2 transformers
($1,566,446), one set of spare parts ($4,905), and transformer field assembly ($44,110).
BACKGROUND AND ANALYSIS
The City of Dover solicited a Request for Proposals (RFP) for two (2) Substation Transformers; one transformer will be
installed at the Horsepond Substation and the other at the St Jones Substation. Both are existing substations that will be
undergoing upgrades due to the age and condition of the existing transformers.
An RFP was solicited and advertised according to City Policy by the Contract and Procurement Manager under Number
08-0004DPU. Dover received a total of eight (8) proposals; one proposal was rejected as it contained an exception that
was not acceptable. The remaining seven proposals were evaluated by Shaw Engineering Services and reviewed by staff.
All proposals were evaluated based on the criteria included in the solicitation which included compliance with
specifications, firm pricing, manufacturing experience in the USA, technical design data, core/coil type, factory
capabilities, total weight, delivery time, and warranty. These evaluations are summarized in the attached spreadsheet
under “RFP Engineering Evaluation Penalty Multiplier” which provides a quantitative analysis of the responsiveness of
the proposal. Additionally, the transformers are also evaluated on a “total cost of operation” factor which quantifies the
total energy losses (the energy costs to operate the transformer for the life of the transformer) coupled with the purchase
price and spare parts cost. Utilizing this data, staff determined that the proposal from Kuhlman Electric Corp. is the most
responsive and should be awarded the contract.
Staff included the expense of the spare parts which includes a gasket set, one high and low voltage bushing, and one
cooling fan with motor. Furthermore, staff recommends including the Turnkey installation for both transformers which
includes unloading, assembly, oil filling/processing, field testing, and a five (5) year warranty. The Kuhlman proposal
price is a firm price; however, it does contain the following payment requirements:
• 20% down payment,
• 30% fifteen weeks prior to scheduled shipment,
• 30% 35 days prior to scheduled shipment, and
• 20% upon shipment (Due net 15 days after receipt of transformer).
Page 8
Request for Qoute #: 08-0004DPU HORSEPOND/ST JONES SUBSTATION TRANSFORMERS
Transformer MVA: 20/27/33MVA
Transformer Voltage HV / LV: 69/12.47KV
Quantity of Order: 2
Bidder: Kuhlman Ronpartners HD Supply RW Chapman HD Supply Irby Waukesha
Manufacturer: KUHLMAN WEG GE/PROLEC Delta Star Niagara Niagara Waukesha
RFP Engineering Evaluation Penalty Multiplier
1 1.046 1.002 1.03 1.128 1.128 1.028
Quoted Price $1,566,466 $1,552,114 $1,736,000 $1,797,550 $1,560,000 $1,565,550 $2,006,600
Sum of Adders (spare parts, surge test, and test charge)
$4,905 $4,740 $9,565 $3,722 $10,590 $10,590 $3,250
Subtotal (adders & quoted price) $1,571,371 $1,556,854 $1,745,565 $1,801,272 $1,570,590 $1,576,140 $2,009,850
RFP Evaluation Penalty Applied to Subtotal (Subtotal * eval. penalty)
$1,571,371 $1,628,469 $1,749,056 $1,855,310 $1,771,626 $1,777,886 $2,066,126
Penalty for Energy Losses: $219,120 $213,600 $306,200 $240,800 $326,400 $326,400 $225,640
Total evaluated price (This includes all the criteria for the bases of the
transformer award which includes Quoted Price, Adders, RFP $1,790,491 $1,842,069 $2,055,256 $2,096,110 $2,098,026 $2,104,286 $2,291,766
Evaluation, and Penalty for Energy Losses)
Bid award ranking based on RFP evaluation criteria, losses, and
1 2 3 4 5 6 7
adders (excludes field assembly)
Transformer field assembly
$44,110 Not available $133,000 Not available $74,000 $75,000 Not available
Bid Award Total Cost (based on Quoted Price, Adders, and Field
Assembly $1,615,481.00
Unit Cost $807,740.50
Miscellaneous Information
Delivery Lead time (wks): 46 wks aro* 54 wks aro 52wks aro as required. 53 wks aro 53 wks aro 54 wks aro
Transformer Plant Location Crystal Spr, MS Tizayuca, MX Monterrey, MX Lynchburg, VA Buffalo, NY Buffalo, NY Wis or NC
*After Receipt of Order
Page 9
Memorandum
Office of the City Manager
P.O. Box 475
Dover, DE 19903
Phone: (302) 736-7005
Fax: (302) 736-7002
E-mail: tdeprima@dover.de.us
To: Utility Committee Members
From: Anthony J. DePrima, AICP
City Manager
Date: August 29, 2007
Subject: FY 07/08 Water/Wastewater Capital Improvement Project (CIP) Briefing
The CIP sheets for the FY 07/08 Water/Wastewater Capital Improvement Projects to be
discussed at the September 10, 2007 Utility Committee meeting are attached for your review.
Thank you.
/dej
Attachment
P.O. Box 475, Dover, DE 19903-0475
Community Excellence Through Quality Service
Page 29
Memorandum
Office of the City Manager
PO Box 475
Dover, DE 19903
Phone: (302) 736-7005
FAX: (302) 736-7002
E-mail tdeprima@dover.de.us
To: Utility Committee Members
From: Anthony J. DePrima, AICP
City Manager
Date: August 28, 2007
Subject: Modification of Maintenance Agreement of Persimmon Park Islands
In September of 2004 the City of Dover accepted the dedication of streets in Persimmon Park
Place. This project had been developed with private streets, but over time they began to
deteriorate and the Condominium Association was not able to care for them in the long term.
The City agreed to take over ownership and responsibility once funding of their repair was
secured through Community Transfer Funds provided principally by Representative Bruce
Ennis.
Maintenance, mostly grass cutting, of traffic islands were specifically reserved by the
Condominium Association as their responsibility. Attached is the deed from the transfer of land
and paragraph three (3) addresses this reservation. At the time the City did not want to send City
mowing crews to this remote location and the Association agreed. Since then, there have been
several occasions when the new Homeowners Association or the Condominium Association has
requested the City to mow these areas. As you can imagine they are looking to save on their
grass cutting expenses. I have maintained that we are not responsible.
Recently we have learned that Representative Bruce Ennis has agreed to fund “bricking” the
islands which will significantly reduce the cost of the maintenance. The question then becomes,
should we modify the deed and take over responsibility of the islands? My recommendation is
that we do not.
I feel that the expense of maintaining these islands will be reduced to a cost of occasionally
spraying for weeds. I feel that the Condominium Association can more than handle this
responsibility and we should not be stretching our landscape crews any further.