EXHIBIT #1
Special Council Meeting 07/24/2006
Proposed Amendments
to Budget Ordinances
July 24, 2006
Page 2
Goal
• The Budget Team (Tony DePrima, Terry
Tieman, and Donna Mitchell) met on
Wednesday, July 19, 2006.
• Their goal was to transfer an additional
$281,000 to the Pension Fund by
reducing budget expenses.
Page 3
Goal
• Each fund (General, Water/Wastewater,
and Electric) should pay their proportional
share, if possible, based on the number of
employees in the pension fund.
• Desired fund proportions:
– General Fund – reduce by $141,000
– Water/Wastewater Fund – reduce by $40,000
– Electric Fund – reduce by $100,000
Page 4
Our Priorities:
• Maintain Electric Reserve due to new contract and
rates.
• Maintain the Water/Wastewater Capital Asset
Reserve for brown water solutions.
• Maintain Electric CIP projects because paid through
Electric Reserve.
• Maintain the Library Reserve.
• Minimize the impact on existing projects and
programs.
The Assumption:
• If funds are available, the budget would be restored
to the original budget as soon as possible.
Page 5
The Decision Process –
First Consideration
Evaluate changed conditions since budget
approval.
1) Assistant Engineer resigned – saves
$19,000 in General Fund and $12,000 in
Water/Wastewater Fund.
2) An error was found – $69,324 for Police
HVAC was double budgeted.
Page 6
The Decision Process –
Second Consideration
Delay hiring of new or vacant position.
1) Fill vacant Electric Engineer II position
three months later – saves $21,000.
2) Fill vacant Electric Engineer I position six
months later – saves $38,226.
3) Hire new Meter Tech I three months later
– saves $21,000.
4) Hire new Account Clerk III three months
later – saves $15,000.
Page 7
The Decision Process –
Third Consideration
Postpone Capital Expense items.
1) Reduce Water/Wastewater Meter Reading
Technology Upgrade from $200,000 to
$175,000 – saves $25,000.
2) Reduce Streets division dump truck
expense from $88,000 to $17,000 – saves
$61,000.
The $17,000 will remain in the General
Fund to restore the truck, if possible.
Page 8
Proposed Amendments to Budget
Options General Water/Wastewater Electric
Goal $281,000 $141,000 $40,000 $100,000
Salary Assistant City Engineer - $19,000 $12,000
vacant three months
Electric Engineer II - $21,000
delayed three months
Electric Engineer I - $38,226
delayed six months
Meter Tech I - delayed six $21,000
months
Account Clerk III - delayed $2,880 $3,075 $9,045
three months
Capital Dump Truck - $88,000 $61,000 CIP paid through
reduce $61,000 reserves
Water/Wastewater Meter $25,000
Reading Technology
Upgrade
Police HVAC duplication $69,324
Total $281,000 $152,204 $40,075 $89,271