REVISED Historic District Commission Meeting Packet
Historic District Commission. May 18, 2023.
This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
8 pages have little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
CITY OF DOVER, DELAWARE
HISTORIC DISTRICT COMMISSION MEETING
Thursday, May 18, 2023 at 3:30 PM
City Hall Conference Room, 15 Loockerman Plaza, Dover, Delaware
REVISED AGENDA
This Agenda has been Revised to include Item HI-23-01 Referral of Fence Permit #23-781 at 147 S.
New Street under Review of Permits Referred to the Commission.
IN-PERSON and VIRTUAL MEETING NOTICE
The Historic District Commission, Meeting for May 18, 2023 will be held in the City Hall Conference
Room. The public is welcome to attend in person. The Meeting will also be provided as a Virtual Meeting
using WebEx audio/video conferencing system as an electronic means of communication. See the
participation information below to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Historic District Commission Meeting of May 18, 2023
Join by Phone Dial: 1-650-479-3208
Access code: 253 151 69843 (Password: 36837432)
Join Online:
https://bit.ly/HDCMeeting5182023
Webinar Number: 2531 516 9843
Webinar Password: DoverHDC
If you are new to WebEx get the app now at https://www.webex.com/ to be ready when the
meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-
7196.
WELCOME
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES
1. Adoption of Minutes of November 10, 2022
2. Adoption of Minutes of January 19, 2023
1
Page 2
HISTORIC DISTRICT COMMISSION MEETING - May 18, 2023 REVISED PAGE 2
COMMUNICATIONS & REPORTS
Summary of Activity
3. Summary of Applications 2022 and 2023
4. Summary of Architectural Review Certificates for 2023
Department of Planning & Inspections Updates
Education & Training Opportunities
5. Historic District Commission Training Session on Advanced Historic Preservation Law &
Procedures - May 18, 2023 at 5:00pm. Sponsored by Preservation Delaware, Inc. and
Division of Historical & Cultural Affairs.
NEW APPLICATIONS
NEW BUSINESS
Review of Permits Referred to Commission
6. HI-23-02 Referral of Fence Permit #23-781 at 147 S. New Street – Referral by the City
Planner to the Historic District Commission for Review of Architectural Review
Certification for a Fence Permit #23-781 for a 6-foot vinyl fence project along the south
property line spanning from the restaurant building at 147 S. New Street to the building
located on 231 W. Loockerman Street. The property is zoned C-2 (Central Commercial
Zone) and subject to the H (Historic District Zone). The property is located on the east side
of South New Street and north of (but not adjacent to) West Loockerman Street. The owner
of record is Otis Brooks. Address: 147 S. New Street. Tax Parcel: ED-05-077.09-01-48.00-
000. Council District 4.
Architectural Review Certification Process and the Historic District Zone
7. Review of Application and Review Processes for Architectural Review Certification and H
(Historic District Zone) Designation
OLD BUSINESS
Certified Local Government (CLG) Program
Implementation of 2019 Comprehensive Plan
ADJOURN
Posted: May 9, 2023
Revised: May 17, 2023
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
2
Page 3
Item 1.
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
NOVEMBER 10, 2022
The Meeting of the City of Dover Historic District Commission was held on Thursday, November
10, 2022, at 3:30 PM as an In-Person meeting in the City Hall Conference Room (anchor location)
and virtually using the videoconferencing system WebEx. With Chairman Czerwinski presiding,
the other members present were Ms. Horsey, Mrs. Mason, and Mr. Street (virtual). (Note: The fifth
Historic District Commission member has not been appointed following the completion of the
term of Mr. McDaniel in 2020).
Planning Office Staff members present were Mrs. Melson-Williams, Mr. Eddie Kopp, Mrs. Mary
Ellen Gray, and Mr. Julian Swierczek.
APPROVAL OF AGENDA
Mrs. Mason moved for approval of the agenda as presented, seconded by Ms. Horsey and the
motion was unanimously carried 4-0.
Voice Vote
• Ms. Horsey -Yes
• Ms. Mason – Yes
• Mr. Street - Yes
• Mr. Czerwinski - Yes
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF OCTOBER 20, 2022
Ms. Horsey moved for approval of the meeting minutes of October 20, 2022, as presented,
seconded by Mrs. Mason and the motion was unanimously carried 4-0.
Voice Vote
• Ms. Horsey -Yes
• Ms. Mason - Yes
• Mr. Street – Yes
• Mr. Czerwinski – Yes
Ms. Horsey mentioned that she wanted to commend Maretta as this was not an easy meeting to
get everything straight with all motions and I think she did a good job. Chairman Czerwinski
concurred.
COMMUNICATIONS & REPORTS
Summary of Applications for 2021 and 2022
Mrs. Melson-Williams mentioned that included in your packet is the Summary of Applications for
2021 and 2022. There is no real change at this point for those tallies. For 2022, there have been
seven applications; and then for 2021, there were six applications. With your last application from
3
Page 4
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
October, we will be continuing to talk about that today and give an update. There were no questions
on any of those previous applications that have come before this body.
Summary of Architectural Review Certifications for 2022
Mrs. Melson-Williams stated that this is the listing of Building Permit activity within the boundary
of the Historic District. There has been a total of twenty-two (22) applications through the end of
October. Most of those were eligible for Staff review of the permit. There were three that the
Historic District Commission was involved in.
Basically, in the month of October, we added one more Roof Permit to the tally for the year. Most
of the permits have been related to either building exteriors or interior. There were four Demolition
Permits and those were related to the buildings associated with the forthcoming Kent County
Family Courthouse project. There were Sign Permits as well and a couple of Fence Permits in the
District. Any questions on any of that permit activity through this calendar year 2022?
Mrs. Mason mentioned that one of the restaurants is Tastees Chicken and Seafood is open, and,
she wondered if Governors Café is going to open.
Department of Planning & Inspections Updates
Mrs. Melson-Williams mentioned that included in your packet was the notice of the Historic
District Commission training sessions that have happened in the last two weeks. Preservation
Delaware, in partnership with the State Historic Preservation Office, presented one of them that
was on “Design Review.” The second one was on “Law and Procedures” associated with Historic
Districts and Commissions which was held virtually on November 7th and 9th. I attended both
virtual sessions. Chairman Czerwinski attend the “Design Review” virtual session. I certainly have
some notes and I think we are in a good stead from listening to the “Design Review” aspects one
because we actually have Design Guidelines. There are some Historic District Commissions out
there that don't have that more detailed Design Guidelines and Standards document. They rely just
on the Secretary of Interior’s Standards for Rehabilitation which can be rather broad. I don't know
if the Chair has any other take-aways from that “Design Review” presentation. Chairman
mentioned that he would definitely recommend his fellow members to watch those sessions. I
missed the legal one, but the first session was a really good overview of what they're looking for.
It has some really good examples of what they actually demonstrated of what the building looked
like before, what was being asked and what was being done, and what the final result was. So, I
would very highly recommend it because there are some really good points. They brought up about
the use of materials. The professor basically presented a historic preservationist’s view from
Maryland and was pretty hard core. If you compare us, I think it is a very eye-opening experience
to actually see how these other Historic District Commissions are handling the projects that are
being presented. I think that they kind of held people's feet to the fire, at least that’s how he
presented himself. There were very few exceptions allowed. It was interesting. For example, we
had the charette that we wanted to add another floor to the Priscilla Block building. They had an
identical situation where they wanted to add a floor and so it's really cool how they worked around
it because the floor was visible from the ground. They denied the proposal in the Architectural
Review but what they did do was that they set it back, so it really wasn't visible, and it still had an
extra floor above it. I really would have to recommend you guys watch at least the first session.
The second session is about the legal legalities of preservation law. I think it's very important
because they give us and the contractors options that they might not have seen in the first place.
2
4
Page 5
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
They showed the actual final results.
Mrs. Mason mentioned that she attended, and it was very interesting and would highly
recommend it. She asked if there were other dates because she only had information on two
dates. Mrs. Melson-Williams replied that those were the two that were presented. It was a
training opportunity that Preservation Delaware and the State Historic Preservation Office
offered to Historic District Commissions here in Delaware. The speaker was from Maryland that
has an association of Historic District Commissions. They have a series of training programs that
they run all the time because there is a training requirement in Maryland if you sit on a
Commission. This is not the first time that they've pulled training support from that organization.
I would imagine that they will try to do some of that again in the future if there are specific
topics. They were asking for ideas. There will likely be some type of follow-up survey that
comes out to those who participated to perhaps identify what some of those topics for next year
are. Certainly, they were free and excellent training opportunities.
Ms. Horsey asked if the links were still available or active. Mrs. Melson-Williams replied she
believed you had to specifically register because of how they were offered. I know they mentioned
that the Maryland Association of Historic District Commissions on their website has some training
that is posted there. I have not looked at what that might be. I think these are for limited viewing
opportunities. If you registered and missed it, I think you will be able to view it directly. For others
I don't know if that opportunity will be available with these, but we can certainly find out.
Mrs. Mason mentioned that Preservation Delaware would send a video for those that were
registered. Mrs. Melson-Williams concurred, the video would be sent to those that registered and
did not attend as well as those who attended because there are a lot of slides of information as well.
Mrs. Melson-Williams mentioned that we are moving into what seems to be still a very busy
time in our office overall. We did have a new Code Enforcement Staff member that came on
board in recent weeks, so the Code Enforcement section is fully staffed. We are still working to
fill the Planner position. We are moving in that direction as we have some interviews pending at
the moment.
Mr. Chairman asked the Commission if they had any questions. There were none.
Review of Permits Referred to Commission
HI-22-07 Referral of Demolition Activities for 233-239 W. Loockerman Street
Update on Referral by the City Planner to the Historic District Commission for Determination of
Demolition by Neglect and Review of Architectural Review Certification for Demolition
Activities for existing fire damaged commercial/residential building. The property was declared a
Dangerous Building by City Council on August 15, 2022. The property is zoned C-2 (Central
Commercial Zone) and subject to the H (Historic District Zone). The property is located at the
northeast corner of West Loockerman Street and South New Street. The owner of record is SAG
Holdings, LLC. Property Addresses: 233-239 West Loockerman Street and 149 S. New Street.
Tax Parcel: ED-05-077.09-01-50.00-000. Council District 4. The Historic District Commission on
3
5
Page 6
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
October 20, 2022, determined the property to be “Demolition by Neglect” and also requested that
the property be evaluated for saving/reconstruction of the structure.
Mrs. Melson-Williams stated that the Referral appeared before you at your meeting on October
20, 2022. In your packet for today's meeting, we refer to the documents that were previously
submitted to you at the last meeting: the Staff Report and there were a number of information items
provided by the Code Enforcement Staff in the form of a cover letter, a timeline of events, an
asbestos inspection survey, and a pre-demolition condition assessment report. At your October 20,
2022, Meeting, the Historic District Commission had made several motions. Your actions on those
motions are captured in what is a Notice of Historic District Commission Action letter that we
provided to the applicants and/or property owner’s representative. At your meeting in October, the
Historic District Commission approved the Determination that the property located at 233-239 W.
Loockerman Street to be Demolition by Neglect. There was a subsequent motion to approve the
Architectural Review Certification to allow Demolition; however, that motion was unsuccessful,
(it failed). Then a third motion was put forward to seek a continued evaluation of the property for
its possible reconstruction and saving the structure noting to refer that back to Planning Staff based
on some of the testimony and a potential buyer’s interest in the building that was related by the
property owner’s representative. Today we are bringing forth an update to you. We did include in
your packet the letter from the City Solicitor regarding this property. It was an interpretation
question given that we had a path that was happening here with the Historic District Commission
and a path related to a Dangerous Building Determination that Council had already acted upon.
I'm going to refer to the letter specifically. This is a letter dated October 27, 2022, that notes that
City Council had previously determined that demolition is to occur related to its consideration of
the property under the Dangerous Building Ordinance. The Solicitor goes on to note that the
Ordinance is silent in the situation that we currently have where Council has already acted under
the Dangerous Building Ordinance and what transpires with the Historic District Commission in
that case. At the bottom of his letter on the first page he notes, “in my opinion, Council has already
acted under the Dangerous Building Ordinance to declare this property to be demolished and that
is the procedure that must be followed to date.” The property owner representative Mr. Patrick
Rock, who did appear before you at the October meeting had some additional correspondence and
contact, he had about the interest of others to purchase the building.
Today that is part of the update from Staff. I do want to go to the City Planner and the Code
Enforcement Officer. If they introduce themselves for the record and then they can identify what
has transpired on that front since your October meeting.
Staff Representatives: Mrs. Mary Ellen Gray, Director of Planning & Inspections and Mr. Eddie
Kopp, Code Enforcement Officer.
Mr. Kopp stated that at the last meeting there was discussion about the Letter of Intent. We
received the Letter of Intent to purchase back in August. I have not received anything further. The
Letter of Intent to purchase in my interpretation would be for the 30 days. The Letter of Intent has
expired, and no further documentation has been submitted to us since October 21, 2022. To the
best of my knowledge, there's only one potential buyer. I talked with the Broker and the sale is not
going to happen. I have not received any more documentation about a potential buyer or the next
step in the process.
4
6
Page 7
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
Mrs. Gray stated we were talking with the Broker and the Firm. We had discussions after this
meeting with Mr. Patrick Rock about who is the property owner, who talked with the Broker, and
our people. The legal counsel talked with the Broker to find out what the Broker’s or buyer’s
intentions were for the property. We found out that the buyer wanted to know about the Letter of
Intent dated August 23, 2022, for $75,000. The buyer was not willing to incur the expense of the
liens that were also put on the property. It was also indicated that they were willing to buy this
property before the motion of the Historic District Commission and he had some sort of analysis
to shore up the building and to provide some stability. We were willing to do that. At the Council
Meeting that was the Bid to demolish. On that Monday, the Broker/Buyer could come to the
meeting to present their case to Council to say okay this is what we want to do with the motion of
the Historic District Commission. It is also with the understanding of this interpretation as well.
The Broker and the Buyer were not willing to incur the expense or commit to doing any sort of
work to shore up the building or to restabilize the building. They can come in and follow through.
Afterwards, there was no one at the Council Meeting.
Mr. Kopp mentioned for the record, the last action taken by the owner, or a representative of the
property was March 18, 2022, and that was to put the initial boards up. Since then, there has been
no work whether to preserve, shore up, clean up, or/and anything on the property to date. The
building was being secured because the windows are being smashed out. This is why the City
actually invested to keep the property boarded more thoroughly to prevent that usage. We have
since secured the sidewalk, asbestos abatement, so on and so forth trying to prevent others from
going in there.
Mr. Kopp noted that during asbestos abatement, you have these Asbestos Signs all over the
property and people are still taking stuff off. The Asbestos Contractor had to chase people out of
the building. Other than that, there has been no change on the owner’s behalf. We have moved
forward with the first steps of Phase One of the Demolition. The asbestos abatement has been
completed. There were some things in there that were put on the backburner that were supposed
to happen during Phase One of the Asbestos Abatement. Due to safety concerns, they are just
going to do it with Phase Two because the building is too unstable to abate that particular
asbestos. The outside of the building is still in good condition, but the inside of the building is
deteriorating. The biggest concern I have is the fire side. When we're looking at this picture it’s
on the left side, (their left), the whole roof is missing. You have water in there endlessly, and all
the floors are weakening. They are starting to buckle and then all the way down to the basement
floor you have mold. Our concern at this moment is the potential collapse of the building due to
the deteriorating state. The bids went out Monday night and the only people present for the
Meeting was me and Council. There was no one present to represent the property owner; it was
only City Staff.
Mrs. Gray mentioned to be clear, we invited everyone to this meeting. This included the Broker,
Owner, and anyone in here. Again, if you want to make your case to stop the Demolition, just
please come to this meeting, because I think Council would be open to what you have to say.
Mr. Street asked if the building was in threat of collapse right now. Mrs. Gray replied yes.
Mr. Street asked if the current owner of the property has expressed no interest in saving or
rebuilding the building or anything else. They are trying to sell it, but as of right now there's nothing
5
7
Page 8
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
under contract, no letters of interest, nothing. I am not setting anything up or tearing it down, I am
just asking. Mr. Kopp replied correct. Mr. Street mentioned, at least this is what I understand, is
that correct? Mr. Kopp replied from my understanding, the owner is out of the country, and he has
a legal counsel handling this matter for him. There has been no communication at all about saving
the building; it's all been about the sale of the property. Mrs. Gray replied that there was one Letter
of Intent that was dated August 23, 2022, but it has since expired.
Mr. Street stated that it was just a Letter of Intent not a contract. That's not really signed on the
dotted line; it's like hey we're interested.
Mr. Street mentioned it's in danger of collapse and everyone wants to tear it down because if it
collapses it's going to obviously be more of a nightmare than it is right now. My initial feeling and
these are just my comments on the whole matter, if it was not in danger of collapse and there's no
harm in waiting 30-days or waiting some amount of time to figure this out a little bit better, I think
that's one thing, but if it's in danger of collapse, it's either someone's got to do something, or it's
got to come down. I don't know where or what our role is in that, especially if the City Solicitor
has already said Council has acted and that is their view of moving forward, is that correct? Mr.
Kopp replied that is my interpretation of it, correct. Mr. Kopp stated for the record, I believe that
if this building had been preserved at the time of the fire and steps were taken to at least shore it
up and preserve and cover the roof line, I don't think we would be in this situation now. I think it's
the overall neglect of the property and the failure to do anything to the building that is why we're
in the situation right now. We are concerned with public safety because of the rapid deterioration
of the building. In my opinion, this building could have been saved had measures been taken back
in March when this place caught fire to preserve it, but unfortunately, it's been left open and it's
just that the elements are destroying it.
Mr. Street stated right, but we are kind of past that point now. I mean it is what it is. If they had
done all kinds of stuff when it burned down the first time, I'm sure it would have been less
impactful than what it is now, but we are past that. We are kind of where we are now. He asked
Mrs. Dawn Melson-Williams if there was an actionable item that the Commission was trying to
take action on today? Mrs. Melson-Williams replied that previously the Commission had asked
for some type of structural engineering report or study about saving the building and if that was
an option. The Commission has not granted Architectural Review Certification to allow
Demolition; however, I think the opinion of the Solicitor has stated that the action by Council to
designate a “Dangerous Building” and order its Demolition now somewhat supersedes the action
by the Historic District Commission. Mr. Street stated that's kind of my understanding. This is at
least what I'm reading or have read, and I am hearing. I guess the question is, what do we do?
Mrs. Melson-Williams replied I think the Historic District Commission could certainly put forth
a motion recognizing that opinion that has been rendered while still expressing their concerns of
reluctancy, but I think in this case their hand has been forced by other processes. Mr. Street
stated that it's almost like we would almost be making a motion just to document. If it is the will
of the Commission just documenting the objection or lack thereof of tearing the building down
because Council has kind of forced the hand and said we've acted too badly. Is that right? Mrs.
Melson-Williams replied I think is a relatively correct interpretation of what has transpired.
Mr. Street stated okay, he just wanted to make sure he was on the same page. I know that
everyone wants to save the building and I'm not sure that I disagree with anyone 100% on this.
6
8
Page 9
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
But I think we are where we are. If the building is in danger of collapse and a professional is the
one signing their name on the dotted line saying that we're worried it's going to collapse, then
who am I to question that professional. If someone wants to pay for a study that says you can
spend all this money to save the building and it can be done then it can be done, but I think we
are kind of in a position where we don't have time to do that.
Mr. Kopp stated after the meeting we did recommend to Mr. Rock to get a Structural Engineer’s
Report. It was explained that this could stop it, if you give us something deeming that it's safe
because we have a structural engineer also. But if you had something that could give the opinion
that maybe it's still safer than what we reported and submit a report to us then we can submit to
Council. But we have not received any support, any report, or Letter of Intent.
Mr. Czerwinski stated that I understand now that the meeting was on October 20, 2022, and there
were actions taken. You know I just wanted to see that we follow through with their offering
something (obviously it's not serious). They offered the owner to reevaluate this.
Mr. Czerwinski asked the Commission if they had any other comments.
Mrs. Mason asked what's the next step? You get another building, and then you have a landlord
that is obviously not taking care of the code violations and this stuff. Do we have a department in
the city that monitors things like that? Mr. Kopp replied yes, Code Enforcement.
Mrs. Mason asked what happened in March of 2022? Was there anything going on to try to save
this building or to get out through the plan? I mean you’ve got to get with the landlords, and you
see what's going to happen anyway. Mr. Czerwinski stated I think to me the thing that we missed
out on and the biggest issue that we had was the City instantly condemned the building. Instead of
saying I need an evaluation by Century Engineering to look at the potential of mitigating and
neutralizing the condition of the building and then putting down the owner until the fire is found.
It's my understanding that they went ahead, and they instantly condemned the building. Again,
there's two sides to the story, but the representative here is saying from the get-go we were told
that the building needs to be condemned and it can't be saved. I've blocked potential for buyers for
this property. If we're going to go back and say well the owner didn't do anything, well the owner
is being told by the City that the building is already past and you can't fix it.
Mr. Kopp just to explain the condemnation. The condemnation is going to happen, and all repairs
have to be made to deem the building safe. In every letter that's sent, we tell people (the owner)
and I explain this to people all the time that the owner and/or contractors can go in there at any
time and make any repairs. They just cannot eat or sleep in there; it's not happening. You are
welcome to go in there and make any kind of correction that you can do. The “condemnation”
basically is to prevent anyone from living in the building.
Mrs. Mason mentioned for example, if electricity isn't working in the structure, are you saying that
you can't move? Mr. Kopp stated that the building is not declared “dangerous” until it's presented
before the Council. That's when it is declared “dangerous” and ordered to be demolished and it is
not stable, and that happened.
7
9
Page 10
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
(Mr. Street stated that he needed to leave the meeting. I wish I could stay longer. If there's any
way I can take action after the fact, I can talk with Staff. If anything comes of this, I'm sorry. I hope
I added some two cents into this, but I have to jump off). Mr. Street left the meeting at 4:13 pm.
Mr. Kopp stated that back in August it was presented before the Council.
Mr. Czerwinski stated that there were no moves to try to get buyers.
Mrs. Gray stated that there were two things that we've looked at that we're looking to correct as a
result of this building. It's not going to solve everything, but it's a step in the right direction. One
there's a bill and there's an Ordinance that is going for First Reading on Monday that requires any
property that is being residentially rented and have insurance (not leased so it doesn't capture the
commercial as what happened to this building). This building had a residential component. I would
say that residential probably captures or accounts for most of the buildings in the Historic District
as most of them have residential components. That would require the property owner to have a
regime. One of the issues here is with this building there was no rental insurance. If they had rental
insurance, it would have been interesting and then the building could have been marketed and or
repaired. The second thing is another Ordinance that is going to the Council Committee of the
Whole on Tuesday which is unpaid fines. For property maintenance violations that remain unpaid
that go to a certain amount now we count well this will eventually become a lien on that property.
That lien amount gets tallied up to the first threshold of $1000 then that property can go to
munitions. That's going to take a little bit of time in the system, but they have to open this. It is not
for the city to make money. The hope is for this to have a trickle back affect for property owners
who won't take care of their property, because you don't want the city to go and sell their property.
Those are two changes that we're looking to put into account as tools that can help address these
properties.
Mr. Kopp stated just a caveat on that, in the near future we are looking to revitalize our Dangerous
Building Ordinance. We will be incorporating the Historic District Commission into that and to
make sure we're linked together, and we don't run into this situation again. To speak on Code
Enforcement, we are very active in trying to get people to come into compliance. One of the
problems is people have ignored us which is why the Lien Ordinance is in there. For example, with
this situation here, you know if they don't want to take care of the property maybe find somebody
who will take care of the property. I always call my Staff for duplication because we're out trying
to make sure to preserve what property we can. You know this isn't the only building that's
concerning to the Historic District Commission. We are actively out there addressing them and
trying to prevent this very thing from happening.
Ms. Horsey stated that she sees it as you're a victim in your department of who they are. We were
caught off guard or our words mean essentially nothing. Doesn't matter what we say and today
there's no point in even taking the vote. For what, to verify what the City Solicitor says? I think
Council and the Mayor needs to be a lot more careful to prejudice a decision on what happens to
a building just because “oh it's going to be so much cheaper and better just to demolish it” because
of the lack of what this property owner is done with the building. You as a potential buyer want to
hear them, of course you're not going to. In a way this whole process has been “fixed”, and I think
it was totally mishandled as you were saying. It's nothing really if the property owner would have
done something right away and if the city would have had a Code to enforce that you have to
8
10
Page 11
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
protect your building. There's no buff; of course, you have to do something about it whether you
plan to save it or not. What is the point and why are we here today? I understand that if the decisions
aren't being made by our Solicitor, then what we are doing today? doesn't mean anything; that is
the way I see it and it's a waste of time.
Mr. Kopp commented that we do reserve the right to abate violations, but we have to give proper
notices and we have to wait unfortunately for them to neglect it before we abate the property. For
example, say the gutters are falling off the house, we have to send so many notices giving the
property owner the opportunity to fix it. Then if it does not get fixed, we can actually hire a
contractor to go out to the property and fix the gutters. We can abate that violation, but we have to
give them the opportunity. Unfortunately, if they ignore it, then it just makes it worse and that's
exactly what happened here. We gave him the opportunity but during that time where we have to
wait the building continued to deteriorate. If it had not been in the condition that it was, we may
have been able to take steps to preserve it. But there is that time that you have to give the property
owner.
Ms. Horsey asked about the Code and if the Council will approve these proposals and see the light
and understand that they have a responsibility not just to condemn something right off the bat.
What is the Council’s plan to put there in its place, any ideas guys? How many buildings in Dover
have been demolished? Do people want to come down here and see another empty lot? We are our
own worst enemies.
Mr. Czerwinski mentioned at this point now that the decision has been made, is there any place
for us to vote for the Architectural Review Certification or is that beyond that point or it doesn't
matter? We're not going to bother voting on anything. What's weird about this though with the
lawyer's letter was that he's going one way, then this is determined as being demolished and we
have to do this. However, in the last paragraph, we did reach out to them and we are willing to
extend.
Mr. Kopp stated that for clarity like with most fire buildings we put the condemnation on there
instantly to protect life safety of everyone, but that doesn't mean the insurance company can't be
there within an hour or anybody who serves. I'll need to send that letter anyway because we've
dealt with uninsured property before. The homeowner will say I'm going call so and so, I'm just
going to put the band-aid on it or I'm going to foot the bill right now just to get the building secured
because it's going to be a lot worse later. Even though it has the condemnation on there, it does not
prevent them from preserving it in any way. I wished that would have happened. A couple of
$1000 could have changed this whole picture.
Mr. Czerwinski mentioned the representative was for the seller and not the buyers. They are going
to do whatever they can to try and gain as much money for the client. They are drawing their straws
too pretty much because that's a lot of money.
Mrs. Mason asked if there was any recourse for this owner, they say that's out of the country? Did
he just disappear? Does anybody actually know or is trying to get justice for this galactic stuff?
Mr. Kopp replied there still was an active investigation on the fire side. We can't talk much about
it. I can tell you now that we are looking at the steps on our end and we are going to recoup our
9
11
Page 12
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
money someway or somehow. We think he's not just going to walk away; so, we are looking at the
steps on how to recoup our money and what's the best way to hold him accountable.
Ms. Horsey stated that it was a lot in taxpayer dollars. Mr. Kopp replied exactly and that's what
we're trying to preserve here. We don't want to waste taxpayer dollars and then we shouldn't waste
taxpayer dollars. Unfortunately, some of the things we did up there might be looked at as a waste
of taxpayer dollars, but we had to preserve what we could to prevent vandalism from happening.
If they had taken steps, you wouldn't have to do that.
Ms. Horsey asked Mr. Kopp if the city was hopeful of the Ordinance proposals. Mr. Kopp
replied that they were not done yet. They have worked on 6 ordinances so far. There is a lot in
the Code that has been done. We are pushing through it, but it is going to take some time. But we
are going to fix some of the things that are wrong, especially like the situation we're in now. We
are going to fix that. We identified the problem; so, be hopeful in that we are pushing. Ms.
Horsey thanked Mr. Kopp for his efforts.
Mrs. Mason asked a question regarding the location at State Street and North Street, you know
the same building second from the southwest corner. Do you know the state of the unstable
building? How long has the building been there? Perhaps three years now, it's just sitting there
and is there anything we can do about the owners? It's an eyesore. Mrs. Melson-Williams stated
that the address is 304 South State Street. It has been issued a permit for renovation activities.
Mrs. Gray stated that it was issued a permit probably back in July and the owner is also a
contractor. Believe it or not, the contractor has been moving forward and working on it, but their
work is on the interior. He has been held up due to a couple of perfect storms of things such as
supply chain issues which is number one and believe it or not on electric meters; it's really odd.
The nationwide shortage has held up not only this project but a lot of other projects on electric
meters and related types of stuff. In addition to that we ran into a problem with the original plan,
we are doing the interior footers and we are planning on some sort of infrastructure there with
the sewer or water piping. The pipes have to be redone.
Mr. Czerwinski mentioned that this building was not highlighted to be demolished until August.
There's no way to make it sound like they wanted to condemn. Mr. Kopp replied that's never the
case. Actually, 304 South State Street actually went before Council to be declared “Dangerous”
and the reason for it was to get that shoring done, but that was done. The very same thing
happened here. That's just case history that you can see. Yes, we put a condemnation on it, but
there is a way to get out.
Mr. Czerwinski mentioned it's a legal term; it's not an actual determination. Mr. Kopp replied
correct.
Ms. Horsey said it sounds scary. Mr. Kopp replied it's not a demolition code until it has been
declared “Dangerous” before Council. Mrs. Melson-Williams mentioned I think in that case we
took it as an emergency case to Council to declare “Dangerous” and to be able to have the City
abate if there was going to be a need to do stabilization. However, in that case the property
owner took some of those steps to stabilize immediately and then it was a waiting pattern of
some time until they sold the building while they were dealing with insurance to then sell the
building. A new owner took over and has taken the permit steps to begin. It does have a lot of
10
12
Page 13
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
interior structural things that are being corrected before they reconstruct what's on the outside of
that east wall.
Mr. Kopp mentioned that since it has been shored up and it's not in danger of collapse, we have
other options. What we could do in the event work stops, we can issue a citation, try to get
compliant persons, taking it to be presented and declared a “Dangerous Building” before
Council. That's some of the citation tools that we can use before we get there, but it all depends
on the condition of the building and the fire damage. If you guys do have any concerns at all
about any buildings that you're going through, let us know. It is better to get it fixed before it gets
to this state. If you see something that you're concerned with let us know. We can reach out.
What we can do is regarding how the process works is send a notice of violation and start fixing
it and then start citations until they fix it. Our goal is compliance. We're not trying to make
money, but we are trying to preserve everything that we do and that's throughout the city. If you
see anything troubling like graffiti or something start to pop up in the blocks Downtown, then
we're tackling it. We are hitting it and we're making people spray paint over it and fix it; if they
don’t, we will. That's one of the abatement tools we have. Anything you guys see, please let us
know. I can give you a card, you can e-mail, or you can call me.
Ms. Horsey said, I do have something, and you looked at it. We had the Friends of Old Dover
open for Market Fair and we would look out over across the street. The owner of that building
put up a nice metal black fence but beyond that property someone next door is always the
problem. The wooden fence is collapsing and looks horrific. Mr. Kopp asked Ms. Horsey if she
knew the address. It’s on the corner then the second house with a parking lot behind it. It is very
visible. Mrs. Mason mentioned if you were on State Street, you've got the parking lot and you
can see the fence right through it. There are two buildings that are commercials and apartments
upstairs, then there is a residence, and the residence is 10 The Green. She is actually the one with
the old fence. She thinks they are planning on fixing it, but she was not sure. Mr. Kopp replied
he would look into it. If you guys have anything in the future, please feel free to reach out to me.
As previously mentioned, I will give you business cards before we leave. We will try fixing it
before it gets too bad; that is our goal. Ms. Horsey mentioned that a few years ago the owner of
the corner apartment building came to us about her metal fence that was beautiful. That is what
we tend to recommend to the Historic District. She had no problem. She did it, but it's the one
next door. It used to be a wooden fence there and you wouldn't see the worse one behind it, but
now you really can and it's collapsing. Mrs. Mason mentioned it also has stairs going up there for
a fire escape; it’s a safety hazard.
Mrs. Gray mentioned that the owner of the property is Scott Sherman, and he is the contractor.
We called him on 10/26 and so he is working on revised structural drawings because they have
to design around the poured footings around the existing water and gas line. He is hoping to
submit those revised drawings to us within the next two weeks. We should have them here
shortly. We are looking to meet with Electric regarding the electric meter issue because of the
shortage. From what I understand at the Directors meeting the other day, I think their electric
meters are slowly starting to become available. He can't get electric to the site without the
electric meters. He started having to run a generator to do the work, and that has been slowing
him down. He's looking to put plans in place for a scaffolding system to put on the sidewalk
that's going to have a walkway. He will be meeting with the Streets Department for a Right-of-
Way Permit so that they can start to work on the front of the building. He will be doing a
11
13
Page 14
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
commercial business on the first floor and perhaps apartments on the second floor. He is working
with an architect because sprinklers may be required based on the occupancy.
Ms. Horsey mentioned that he was a very good man, and he has worked on several State
projects. She also worked with him. He knows what he is doing.
Mr. Czerwinski said nothing needs to be done by this Commission for this process.
Mrs. Melson-Williams replied (referring to the 233-239 W. Loockerman Street) that I think it at
this point you've heard the Report ultimately with the eminent demolition as noted. The bid for
that Demolition was presented to City Council and approved. That process for Demolition is in
the point of what I would call the planning stages now of how to actually schedule that and get
that accomplished. There will be a Demolition Permit that will need to come through our Office
and Staff can certainly issue that kind of noting the situation that it was declared “Demolition by
Neglect” by the Historic District Commission and that it is the Solicitor's opinion that the order
to demolish by Council supersedes any step that the Historic District Commission could take at
this point in time.
Ms. Horsey asked about the bricks from this building, any number of them, could some of the
bricks be saved? What I'm thinking is that the People’s Church tower that was built in the 20s is
the same brick. I just didn't know, and I know getting mortar from old brick is not fun, but I just
didn't know where all of this would go once it's taken down. Mr. Kopp replied I think on the
front and back of the building they could potentially be saved. On the New Street side, we just
discovered on the Asbestos Abatement that there are pipes going in between the brick of the
wall.
Ms. Horsey asked if this was where the fire trickled up? Mr. Kopp replied yes, actually in the
middle of the floor there's a pipe chase going up there. This is something that the contractors
have never seen where the pipes are actually going up in the brick. In between the outside wall
and the inside brick wall, there's piping going all the way up and it has got to be remediated now.
It's not something that was caught until our final inspection of the Asbestos Abatement Phase
One. When they caught it, they were like wow! When we got up to the top, the pipe literally goes
from the basement all the way up top with asbestos cladded. That's going to be very interesting
to remove which just prolongs our Asbestos Abatement on this project because we didn't realize
it was so in depth in the wall. When you actually investigate it further it's crazy. I've never seen
this before and they have never seen it before in the outside wall.
Mrs. Gray and Mr. Kopp stated that they spoke about the bricks on the front of the building. Mr.
Kopp stated that the only thing is that the bottom layer closest to the sidewalk has asbestos in the
caulking. So, it's just them very small bricks that would have to be disposed of with the asbestos,
but anything else on there is salvageable. Mrs. Gray mentioned it is something that can be asked
because you don’t know what’s possible.
Mr. Kopp stated that he had a pre-meeting with the Demolition Contractor, and he had asked
them because in our Bid basically anything with the building gets turned over to the Demolition
12
14
Page 15
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
Contractor including anything inside. I don't see why they couldn't give us some brick off the
building.
Mrs. Gray mentioned for example when I worked in Newark there were some dormitories that
were taken down. There was a staging area that set aside some bricks from the dormitories for
people who had stayed there or whatever. The General Contractor set aside a staging area for the
bricks on the site and then the city put them somewhere else to see what entity or if someone
wanted them. I love the idea of using building materials that are not made any more if they are
useful.
Mr. Kopp mentioned that he does have a contractor meeting on November 18, 2022, at 9:00am
on site. All the contactors involved will be there. It will be a public meeting and Council will be
there. The Historic District Commission members are welcome to attend. If you want to express
that concern with them, you could ask, “I just want some bricks”. The contractor that we are
using is very easy-going, I don't perceive him saying no. Ms. Horsey said wonderful. She asked
for clarification when was the meeting. Mr. Kopp replied, Friday, November 18, 2022, at
9:00am.
Mr. Kopp mentioned again, if you have any questions about any of the Code that can sometimes
be confusing, please reach out.
Ms. Horsey mentioned she was on the Planning Commission for 12 years and I still didn't get it
all.
Annual Meeting of Historic District Commission
Election of Chair and Vice-Chair
Mrs. Melson Williams stated that per your Bylaws, November is the Annual Meeting of the
Commission where you elect the positions of Chair and Vice Chair for the next calendar year. I
did give you a copy of your Bylaws and I will let you know that the Chair and Vice Chair have
not fully served them up to six years that they're eligible for. So, depending on who you see fit to
lead you in the next year, you could certainly at this point make nominations and we can move
through the election process.
Ms. Mason made the nomination that Ms. Horsey remain Vice Chair and Mr. Czerwinski for
Chair for the next calendar year. Mr. Czerwinski seconded the nomination for Ms. Horsey to be
Vice Chair and himself Mr. Eric Czerwinski as Chair of the Historic District Commission.
All members present were in favor of the motion to accept Mr. Czerwinski as the Chair and Ms.
Horsey as the Vice Chair of the Historic District Commission.
Meeting & Deadline Schedule for 2023
Mrs. Melson-Williams stated that the Meeting and Deadline Schedule for 2023 was included in
your meeting packet from the Planning Staff. It holds for calendar year 2023. You will meet on
the third Thursday of the month and then we have to count back a certain number of days and
establish your deadlines. The deadline has to be at least 30 days prior to your meeting, and we
13
15
Page 16
Item 1.
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 10, 2022
always make it land on a Friday. We have done those meeting dates and deadline dates for next
year and just wanted to present that to you. We will double check that we did all our numbers
right before we finalize it, but we do want to at least give you this as a heads-up.
OLD BUSINESS
Certified Local Government (CLG) Program
Mrs. Melson-Williams at the last meeting we noted that there is an opportunity to still make use
of the grants. We have not made any additional progress at this point because we have been a
little busy with the application that you had today. Hopefully, we will get moving on that and the
steps forward with that. That training I will note was somewhat targeted with governments that
are part of the Certified Local Government program; so, I think we may see more training
opportunities across the board.
Implementation of 2019 Comprehensive Plan
Mrs. Melson-Williams mentioned that we will just continue to keep that on your agenda in case
we need to report something to you. There is not anything specific to the Historic District at this
point for today.
Ms. Horsey mentioned that this should have been under New Business but let's keep Mr. Joe
McDaniel in our thoughts. He was a former member for at least six years. He served as Chair and
was very faithful, attending all meetings of the Commission. He is suffering from health
conditions. Some of the members were not aware of his health conditions.
Ms. Horsey moved to adjourn the meeting, seconded by Mrs. Mason, and unanimously carried
3-0.
Meeting adjourned at 4:55 PM
Sincerely,
Maretta Savage-Purnell
Secretary
14
16
Page 17
Item 2.
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
JANUARY 19, 2023
The Meeting of the City of Dover Historic District Commission was held on Thursday, January
19, 2023, at 3:30 PM as an In-Person meeting in the City Hall Conference Room (anchor location)
and virtually using the videoconferencing system WebEx. With Chairman Czerwinski presiding,
the other members present were Mrs. Mason, Mr. Street and Ms. Horsey (virtual). (Note: The fifth
Historic District Commission member has not been appointed following the completion of the
term of Mr. McDaniel in 2020).
Planning Office Staff members present were Mrs. Melson-Williams, Mrs. Maretta Savage-Purnell,
Mr. Julian Swierczek, and Ms. Katherine Oehmke.
Chairman Czerwinski welcomed everyone back from the holiday break.
Mrs. Melson-Williams introduced the new Planner Ms. Katherine Oehmke. She joined our office
in early January.
APPROVAL OF AGENDA
Mr. Street moved for approval of the agenda as presented, seconded by Ms. Mason, and the motion
was unanimously carried 4-0.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF NOVEMBER 19, 2022
The meeting minutes of November 19, 2022 is still being prepared. The adoption of the minutes
will be at the next meeting in February.
COMMUNICATIONS & REPORTS
Summary of Applications for 2021 and 2022
Mrs. Melson-Williams mentioned that included in your packet first is the Summary of
Applications for 2021 and 2022. For the last calendar year, we had a total of 7 Applications. A
number of them are either underway or are progressing through the process. If you have any
questions, I will be happy to talk about those. She noted that one of them that I will note is the
Application regarding the property on Loockerman Street which was HI-22-07 that was your item
of discussion at your October and November meetings. That property if you have not been by
there, you can see looks a little different. They are progressing through the demolition of that
building at 235-239 W. Loockerman Street. The building is totally down. They have some survey
that needs to be completed of the basement area related to some of the footings that they need to
leave in place before they start the process of backfilling the hole. Contractors have been on site,
and she believes that the asbestos is cleared off the Site at this point. We are still looking at a
couple more weeks here to bring that location to grade and then see the property. Our Code
Enforcement Staff has been very involved in that and the Planning Director.
17
Page 18
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 19, 2023
Ms. Mason mentioned that she noticed that there was just a big hole down there and asked if they
were just going to fill it up with dirt? Mrs. Melson-Williams replied yes. They will backfill it with
dirt; they have to compact it as they go. There will be soil testing for that so it will be brought to
grade. There are some minor sidewalk repairs that also have to be made, but the Lot will be graded
and seeded for grass. Ms. Mason asked if they were going to build something, and they knew about
it then they wouldn't have to fill it all in because it looks solid down there. Mrs. Melson-Williams
mentioned that at this point there is no future plan for the property. It with any Demolition, any
basement area is backfilled in brought to grade.
Summary of Architectural Review Certifications for 2022
Mrs. Melson-Williams stated that this is the listing of Building Permit activity within the boundary
of the Historic District. There has been a total of thirty-nine (39) applications through the end of
December. The majority of them were related to building exterior type items, but a lot of those
also include items that may not have been visible from the public way. Staff was involved in the
sign off of 34 of those and the Historic District Commission was involved with 5 of them. Since
our last meeting Permits were issued in December. One of those is the Demolition Permit for that
235-239 West Loockerman Street location.
Department of Planning & Inspections Updates
Historic Preservation Grant Opportunities
Mrs. Melson-Williams mentioned that associated with Preservation Delaware, they have a
Delaware Preservation Fund that several times has made available small grants available.
We received notice of that funding opportunity as part of their outreach about that program.
Included in your packet is their basic guidelines. Typically grants range from $2000-$5000.
However, they can consider more. There are some specific eligibility requests that the resource
has to meet and the types of proposals that are also accepted. There is much more detailed
information there. In the past, they have done at least one round of Grants and may have the
opportunity to do more than one round of Grants in the calendar year based on funding. One of the
things that is new this year is that they are accepting applications for non-capital projects that
would allow for some planning and architectural studies or preparation of National Register
nominations as well. That is a change to their program. If you have any knowledge of a project or
something that might benefit from seeking this grant funding, certainly pass this information along.
We previously introduced Katherine at the beginning of the meeting; so, now we have full staff in
the Planning and Inspections Department as of this moment. That's exciting for us.
HI-23-01 Lands of Shank Shack, LLC Parking Lot Improvements at 34 The Green – Public
Hearing and Review for Action on the Architectural Review Certification associated with
parking lot reconfiguration and parking improvements at 34 The Green. The property is zoned
RGO (General Residence and Office Zone) and is subject to the H (Historic District Overlay
Zone). The project is also associated with the future redevelopment of the western portion of the
existing parking lot area (now located on adjoining parcel) that will be part of the Kent County
Family Courthouse project; the adjoining area was previously part of the subject parcel and is
zoned IO (Institutional and Office Zone) and subject to the H (Historic District Zone). The
property is located in the southwest corner of The Green and is south of Bank Lane. The owner
of record is Shank Shack, LLC. Address: 34 The Green. Tax Parcel: ED-05-077.09-03-35.00-
000. The related parcel located on South Governors Avenue owned by the State of Delaware is
2
18
Page 19
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 19, 2023
Tax Parcel ED-05-077.09-03-36.00-000. Council District 4. Minor Lot Line Adjustment Plan MI-
21-09 is associated with this property.
Mrs. Melson-Williams gave a summary and presented information on Application HI-23-01.
This is an Application for Architectural Review Certification associated with parking lot
reconfiguration and parking improvements at 34 The Green.
Mrs. Melson-Williams mentioned that for the record Commission member Ms. Mary Mason will
not be eligible to participate with this consideration of this application as she is the adjacent
property owner and per your Bylaws that is a conflict of interest. We provided some information
about the history of it. Historically, it was the Captain Wild 's House and there's some Sanborn
Fire Insurance Map data that we provided. It's within the City 's Historic District and it also is
within the boundaries of the National Register of Historic Places in the Dover Green Historic
District. They have requested a waiver of the upright curbing; that is something that the Planning
Staff has approved. The Zoning Ordinance gives us the ability to approve that. The project also
has a focus on some tree planting and landscaping as part of the project. Planning Staff has put
forward some recommendations regarding the application. We do recommend conditional
approval of it. We have a couple of notations of questions that we have on one aspect about the
island itself. This project will also have to give through an Administrative Site Plan review with
some of our technical agencies as part of the process here.
Representative: Mr. K. James Taylor, Jr. PE; Senior Project Manager at Verdantas, Mr. Bill
Lenihan AIA Architect of Tevebaugh Associates.
Mr. Taylor stated that if you guys recall we were here a couple of times at this point with
presentations as far back as a year ago. We came forward for the King of Clubs Parking Lot
which was just to the north of this one. Today, we are here for the Shank Shack parcel. As Mrs.
Melson-Williams mentioned this property was recently subdivided and kind of cut through. To
refresh your memory on what took place within Kings of Club Lot. At this point in time, we're
looking for approval for a similar layout on the Shank Shack parcel, which is just to the South.
You will see the approved plan just above as well as some of the future site amenities that are
taking place on the adjacent property. Today, the existing condition is not straight. There are no
parking lines there; parking is kind of just on its own. We are looking to create some defined
parking spaces as well as some needed parking space. We are adding a row of 10 parking spaces
and one ADA van accessible parking space. As mentioned, we are also providing landscaping.
We requested a waiver from the upright curbing because there is no curbing there today. That
curbing with such a tight Lot would cause issues as well. We do have a full direction or full
traffic flow now. Unfortunately, the Lot is not wide enough to be able to provide parking on both
sides of the 20-foot drive aisles with the parking. He asked if anyone had any questions or if Mr.
Bill Lenihan wanted to add anything.
Mr. Lenihan stated that as mentioned this is part of the larger Family Court Project on the plan
here is the full Family Courthouse site with the Courthouse and the Parking Garage. Here are the
Shank Shack at 34 The Green property we are discussing. As mentioned, they used to extend all
the way up to Governors Avenue. Part of the real estate transaction was to acquire this western
3
19
Page 20
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 19, 2023
part for the State for this larger project. The State would reconfigure the balance of the parking
that was left here. Mr. Taylor and his team balanced the impervious surface that keep it to a
minimum to be able to get parking spots on the paved section.
Mrs. Melson-Williams mentioned that she believes Amanda is just listening in; Amanda is with
Verdantas.
Chairman Czerwinski asked if anyone had any questions. Does anyone have any questions
regarding the mulch?
Mr. Street mentioned that it calls for 3 inches shredded hardwood bark mulch which is kind of a
standard spec for a hardwood mulch. He asked if Staff had any concerns.
Chairman Czerwinski mentioned that he was just saying clarifying that the west side island is
where they would do the mulching. That would be clear by the Landscape Plan.
Mr. Taylor stated that in this rendering, yes you could be correct. Mulching was not necessarily
shown in that western island, but you don't normally have shrubs that are planted without mulch.
There are shrubs proposed. You can kind of see them underneath the tree. There are some shrubs
proposed in that location and that will be mulched.
Mr. Lenihan stated that lower scale planting is along the new alley here and then along the
southern border. It is very tough to see but you can kind of see that there is a little bit of ground
right underneath that.
Ms. Horsey stated that she was familiar with the property. The plan does not indicate which two
(2) trees are going to be taken down. Are those along the fence line or the property line? Will
they be replaced?
Mr. Taylor replied that the trees that are going to be removed is on the parcel between this
property and the King of Clubs property. We are trying to preserve those trees as part of the King
of Clubs and the more we got into this the closer we got to some of those trees. We are
preserving a tree on that side, but there's some other ones that with their root bed and what needs
to be constructed to get the parking in there are a couple trees that would be removed on that
side.
There are not currently any trees proposed to be removed between this property and the property
to the south.
Ms. Horsey mentioned I thought it said on the Application that we are on the south side of the
property, that's why I'm asking. You're now saying it's on the King of Clubs side which is the
north side. Mr. Taylor replied that's correct. Mrs. Melson-Williams replied that I think there is
probably a Landscape Plan for it. Ms. Horsey stated that it doesn't say though. I mean it's pretty
much the Landscape Plan showing you the trees that are coming down on it, but this one doesn't.
So, that's why I'm asking the question. I see where the new trees are going. Mr. Taylor replied
that the Existing Conditions Plan has the trees that are to be removed and that's the second sheet
of the plan set. The trees that I'm able to remove are between the King of Clubs and the Shank
4
20
Page 21
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 19, 2023
Shack parcel. The south is where the new trees are being proposed. Currently, the asphalt does
go up a little bit closer and so we are removing asphalt by the property line to the south of us at
36 The Green to provide more landscaping in that location than what's there today.
Chairman Czerwinski asked if there were any further questions.
Chairman Czerwinski opened the public hearing and after seeing no one wishing to speak,
closed the public hearing.
Ms. Horsey recommended approval of Application HI-23-01 Architectural Review Certificate for
the Parking Lot Improvements project at 34 The Green that is associated with an Administrative
Site Plan. The motion was seconded by Mr. Street and unanimously carried 3-0. Ms. Mason
abstained due to a conflict of interest.
Update on the Family Court Project
Mr. Lenihan stated that they were starting with the former Box Outlet site as that was needed to
get things underway for the swing space for parking. One of the things that's been in the works is
a much larger stormwater or sewer work project that the City is working on that goes all the way
down to the river. We are working with the City to incorporate a below grade Stormtech water
system here in this parking lot that the City will own on the state property. That is going to be
sharpened with this parking lot. It's a great time for the State and the City really working
together. The chambers stove the storm surge and then slowly release the water out and stop the
surcharge from going all the way down to the river. We will improve all the stormwater
conditions here at the city section that has been a problem for some time. The project is currently
out to bid for all the work on this site. This will probably be due in February and within 2 months
we hope to start the physical construction on this part of the project. For the balance of the
project, they are still arguing approvals with DNREC, EPA and the City. All is going very well,
and we are working on design. We hope to have construction started on this part of the site
towards the end of the summer. He mentioned the rendering of the Courthouse and the parking
garage from the Governors Avenue and Water Street intersection. He mentioned that it's very
exciting to see this getting closer to physically getting started.
Chairman Czerwinski mentioned that it was interesting on the storm drainage in the parking lot.
It’s interesting we have issues from the old stream that used to go through that area down to the
St. Jones that was there during the colonial period. More impervious surface they added over the
years and now we're going to be increasing that amount to be much closer to the intersection in
order to catch up.
Review of Permits Referred to Commission
Mrs. Melson-Williams we do not have any permits to bring to you today.
OLD BUSINESS
Certified Local Government (CLG) Program
Mrs. Melson-Williams stated that we continue to be a participant in that program. We are still
assessing the ability to make use of some of the grant funding that we have. Now that we've got
5
21
Page 22
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 19, 2023
staff on board, hopefully, we can be making a decision about moving forward with that. Look for
more details on that to come.
Implementation of 2019 Comprehensive Plan
Mrs. Melson-Williams mentioned that this is the time of year where folks can make any
Comprehensive Plan Amendment requests. We do have a set of them for this year that have started
their consideration process. However, they do not impact property in the Historic District.
Discussion of the Loockerman Street Area
Mr. Street asked all the members to seriously consider this as he has been thinking about this for
a long time. He mentioned a couple of things that refer to the Historic District as well as the
demolition of the building on Loockerman Street. In previous years, there was a discussion of
taking Loockerman Street out of the Historic District or a portion (2 blocks). He agrees with it.
You can find little pieces and parts of buildings that are historic and that kind of stuff. What we
are looking at is that building being torn down and we've got a vacant site across the street kind of
catacorner that's been green for a while. I think there was a fire there years ago. It is now the Family
Dollar. Looking at the architecture that's there now, it’s from the 80’s kind of architecture and the
highlighting of stuff. He thinks that someone has spent a lot of money to really bring back a lot of
those buildings, at least on the ground level or with the first 2 stories back to any kind of historic
piece. It's one of those things where I'm like why we keep looking at those two blocks on
Loockerman Street. To me there's only pieces of it and of course, I work for an architectural firm
and have chatted with one of our architects in Salisbury, Maryland. He asked, so what do you
think, and do you think this is reasonable; and the architect from Maryland stated that they did the
same thing. They took a piece of one of those old streets in Salisbury and pulled it out because of
the same reason. It wasn't anything historic there left, not like The Green or State Street between
Loockerman Street and The Green where you know those are great historic buildings and places.
It might help Loockerman itself revitalize if it's not so hard to get things done on Loockerman
itself. I'm not saying we are really an impediment to that, but it's definitely a case in point when
they were trying to redevelop Loockerman Way. He and Chairman mentioned the purchase and
presentation of two (2) buildings that were purchased in that area. There was a brief discussion
amongst the members. Ms. Mason mentioned that there was nothing great there to look at anymore.
Chairman Czerwinski mentioned that a lot of buildings have been lost on the west and east side.
The hardware store has disappeared. We had discussions with the city about the responsibility of
building owners. It did not have anything to do with architecture.
Ms. Mason mentioned that in the old days you had little cafés and the Bryan’s Drugstore was there.
It was always who was putting things in there. I don't know about the Island Hot Dogs. It is really
a big disappointment. I just don't know what it is, the service is terrible, the hot dogs were cold,
they steamed the hot dogs, and I had a cold hot dog. I just want to see business on Loockerman
Street. I plan to go back and the next time I will ask them to steam the hotdog a little bit more.
They have a great concept there. They also have another place just to buy snacks; not sure how
they are going to make any money.
Chairman Czerwinski mentioned an area of Loockerman about doing away with.
Ms. Mason mentioned that she has tried to patronize every store downtown. She said she did ask
the owner as we did not want to be critical why did she named the business the Black Swamp? It
6
22
Page 23
Item 2.
CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 19, 2023
was because it's near this place, the Black Swamp. She did not think that the Black Swamp is
appealing to a lot of people. It is a beautiful store that is located on the corner under the Bayard
Plaza.
Chairman Czerwinski asked Mrs. Melson-Williams what the guidelines would be if they were
pulled out of the Historic District. Mrs. Melson-Williams replied that there is an entire process. If
you would like to put this on a future meeting for discussion, Planning Staff can advise you as to
what that process would be and things that you would need to think about.
Mr. Street mentioned that he thinks that would be great.
Ms. Mason mentioned just give them different guidelines. You don't pull them out but maybe
don’t make it too complicated. I'm seeing now that we're getting some new business down there.
There is another restaurant that's coming to where the old Newsstand used to be, and they are
working. There is some activity which is really encouraging.
Mr. Street mentioned as they continue to discuss and conversate about the Downtown that I
would be grateful if Staff could give us a briefing on what that would entail. Maybe we can
further the discussion on whether it's portioned pieces or whatever, and whether it is beneficial to
taking a piece of Loockerman Street out of the Historic District.
Mr. Street moved to adjourn the meeting, seconded by Mrs. Mason, and unanimously carried
4-0.
Meeting adjourned at 4:26 PM
Sincerely,
Maretta Savage-Purnell
Secretary
7
23
Page 24
City of Dover Historic District Commission
Summary of Applications 2022 Item 3.
Updated thru May 9, 2023
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-22-01 Referral of Fence 502 -506 S. State Fence Permit Permit #21-1556 referred to HDC by Permit Application received 11/18/2021
Permit #21-1556 Street and 100 W. City Planner for consultation on and Referred to the HDC for consultation.
at 506 S. State Water Street Architectural Review Certification; Permit approved for issuance per HDC
Street 1/20/2022 HDC recommended action of 1/20/2022. Permit issued
approval of ArchRevCert to allow 1/24/2022. Fence installed.
revised height of 6-feet for black metal
fence.
HI-22-02 Lands of the State 411 S Governors Rezoning to H Public Hearing and Review by HDC on Request to expand boundary of the Historic
of Delaware at S. Avenue, 429 S (Historic District 3/24/2022; Recommended Approval District as Rezoning Application HI-22-02/Z-
Governors Governors Avenue, Zone) of Rezoning 22-01. Public Hearing and Review by
Avenue and W. 435 S Governors Planning Commission on 3/21/2022 -
Water Street: Avenue, 439 S Recommendation of Approval; Public
Rezoning to H Governors Hearing and Review by Historic District
Avenue/117 W Commission on 3/24/2022 -
Water Street, 441 S Recommendation of Approval; and
Governors Avenue, scheduled for Public Hearing and Final
447 S Governors Action by City Council on 4/11/2022.
Avenue Rezoning Approved.
HI-22-03 Kent County 415 S. Governors Site Plan Review for Public Hearing and Review for Site development plan for new Courthouse
Family Avenue and 445 S. Architectural Recommendation on Architectural Building, Parking Garage Structure, and
Courthouse & Governors Avenue; Certification Review Certification by HDC on associated Site Improvements. For Review
Parking Garage East side of S. 4/11/2022. Recommended approval of by HDC completed and recommendation
Governors Avenue ArchRevCert including reduction of forwarded to Planning Commission.
between Bank Lane rear yard setback. Planning Commission granted conditional
and W. Water St approval of S-22-06 and ArchRevCert on
June 21, 2022. Check Print Review Process
working towards Final Plan Approval. Lot
Consolidation Plan to create one parcel
recorded.
24
Page 25
City of Dover Historic District Commission
Summary of Applications 2022 Item 3.
Updated thru May 9, 2023
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-22-04 Referral of Permit 527-529 S. State Permit for Parking Permit #22-661 referred to HDC by City Permit Application received 4/20/2022 and
#22-661 at 527- Street Improvements Planner for consultation on Referred to the HDC for consultation.
529 S. State Architectural Review Certification; HDC Project for construction of seven parking
Street recommended ArchRevCert with spaces on the property. received
conditions on screening at 5/19/2022 submission of Revised Plan of parking area
Meeting for Permit Review. Permit issued
12/27/2022. Project underway.
HI-22-05 Delaware Public 121 Martin Luther Architectural Review Project referred to HDC by City Planner Proposed Roof Project Referred to the HDC
Archives: King Jr. Boulevard Certification for consultation on Architectural for consultation. Project design
Consultation on North Consultation Review Certification; HDC considered consideration of alternative materials for
Roof Project at 5/19/2022 Meeting and made Roof Replacement Project. Awaiting formal
recommendation of roof material Permit submission.
options.
HI-22-06 Referral of Permit 43 The Green, John Permit for Accessory Permit #22-1298 referred to HDC by Permit Application received 7/25/2022 and
#22-1298 at 43 Bell House Structure (Restroom City Planner for consultation on Referred to the HDC for consultation.
The Green & Storage) Architectural Review Certification; at Project for construction of accessory
8/18/2022 HDC recommended structure on the property. Permit approved
approval of ArchRevCert to allow by Planning Office for issuance per HDC
accessory structure construction and action of 8/18/2022. Permit Approved
reduction of rear setback requirement. pending issuance.
25
Page 26
City of Dover Historic District Commission
Summary of Applications 2022 Item 3.
Updated thru May 9, 2023
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-22-07 Referral of 235-239 West Update on Project referred to HDC by City Planner Building declared Dangerous by City Council
Demolition Loockerman Street Dangerous Building for update on building and proposal on 8/15/2022. Following no action by
Activities at 235- Designation and for Demolition of Dangerous Building; property owner, the City is progressing with
239 W. Demolition Activities at 10/10/2022 Meeting HDC Bid Process for Demolition; Bid Opening
Loockerman St considered Determination of was 10/26/2022 and award made. HDC
Demolition by Neglect and determined "Demolition By Neglect" for the
Architectural Review Certification for Building and pertaining to Architectural
Demolition Review Certification the HDC's motion
requested continued evaluation of the
building for the potential of saving it
acknowledging potential buyer interest.
Determination by City Solicitor that City
Council Action governs. Demolition Permit
#22-1902 issued 12/5/2022. Demolition
complete and lot stabilized with grass
planting.
26
Page 27
City of Dover Historic District Commission
Summary of Applications 2023 Item 3.
Updated thru May 9, 2023
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-23-01 Lands of Shank 34 The Green Site Plan for Parking Review for Architectural Review Site Plan granted conditional approval by
Shack, LLC: Lot Reconfiguration Certification of Site Plan; Public Historic District Commission. Administrative
Parking Lot Improvements Hearing and Review by HDC Site Plan review completed: Final Plan
Improvements 1/19/2023. Recommended approval of approval issued May 2023. Pending
ArchRevCert for project. submission of Building Permit to commence
construction. Improvements are associated
with future Kent County Family Court
Project.
27
Page 28
Summary of Permit Applications with Architectural Review Certification
Item 4.
2023 - Updated Thru 5-9-2023
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
1/25/2023 22-2005 101 W Loockerman St Fence Permit Staff Approval Installation of gate system (metal)
at parking lot entrances.
2/16/2023 23-6 6 S State Street Window Permit Staff Approval Replacement of windows on third
floor with double hung 2-over-2
windows. Same size as existing.
2/23/2023 23-91 45 S State Street Demolition Permit - Interior Staff Approval. No ArchRevCert Interior demolition activities related
required for interior work. to renovations due to water
damage.
3/20/2023 22-1674 108 W Loockerman St, Sign Permit Staff Approval Installation of projecting sign for
Coney Island Grill restaurant.
4/21/2023 22-1017 144 S Governors Avenue Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for commercial
Renovations required for interior work. tenant space on first floor and
apartment units on second floor. No
exterior changes to brick building.
4/12/2023 23-315 225 W Loockerman St Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for commercial
Renovations required for interior work. tenant (retail) on first floor.
4/12/2023 23-316 225 W Loockerman St Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for apartment
Renovations required for interior work. unit on second floor.
4/4/2023 23-354 146 S State Street Sign Permit Staff Approval Installation of projecting sign for
office and wall sign placement on
porch railing side.
4/4/2023 23-355 144 Kings Hwy SW Sign Permit Staff Approval Installation of projecting sign along
porch cornice for restaurant.
4/5/2023 23-364 231 W Loockerman St Fence Permit Staff Approval Installation of two gates in alleyway
spaces between buildings.
4/19/2023 23-421 102 S Governors Ave Administrative Building Permit Staff Approval Replacement of sidewalk leading to
building.
28
Page 29
Summary of Permit Applications with Architectural Review Certification
Item 4.
2023 - Updated Thru 5-9-2023
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
4/17/2023 23-442 31 W Loockerman St Sign Permit Staff Approval Installation of one projecting sign
and reface of existing wall (box) sign
for new retail tenant.
4/20/2023 23-458 203 S State Street, Delaware Roof Permit Staff Approval Roof replacement with DaVinci
State University Foundation shake style composite shingles on
multiple roof surfaces.
4/20/2023 23-459 203 S State Street, Delaware Building Permit - Exterior Staff Approval Reinstallation of shutters on
State University Foundation Renovations building of panel shutters and
louvered shutters with metal
hardware.
4/26/2023 23-478 6 Kings Hwy NE Fence Permit Staff Approval installation of black metal fence
with gates in the rear.
4/21/2023 23-546 151 Kings Hwy SW Roof Permit No Planning Staff Review. Replacement of flat roof with EDPM
roof membrane.
29
Page 30
Item 6.
City of Dover
May 16, 2023
Mr. Otis Brooks
Tastee’s Chicken & Seafood
147 S. New Street
Dover DE 19904
Via Email: obrooks944@gmail.com
RE: Referral of Fence Permit #23-781 to Historic District Commission, HI-23-02
Proposed Fence at 147 S. New Street, Dover DE
Tax Parcel: ED-05-077.09-01-48.00-000
Dear Applicant:
This letter is to inform you that Fence Permit application #23-781 has been referred to the
City of Dover Historic District Commission for consultation. Fence Permit #23-781 was filed
on May 12, 2023 for a fence project at 147 S. New Street in Dover, Delaware. The Project
outlined in the Permit submission involves placement of a six-foot vinyl fence along the south
property line spanning from the restaurant building at 147 S. New Street to the building located
on 231 W. Loockerman Street. This fence is to replace an existing wood fence that is damaged.
The location of the subject property within the City of Dover’s Historic District zone requires the
review and issuance of an Architectural Review Certificate (ARC) for construction and
demolition activities. Fences are eligible for Staff review of the ARC during the Building Permit
application process. Project activities are reviewed for compliance with the Zoning Ordinance
and the Design Standards and Guidelines for the City of Dover Historic District Zone as stated in
Zoning Ordinance, Article 10 Section 3.25(A).
3.25 Architectural review standards.
(A) An architectural review certificate may be issued if it is found that the architectural
style, general design, height, bulk and setbacks, arrangement, location and materials
and structures affecting the exterior appearance are generally in harmony with
neighboring structures and complementary to the traditional architectural standards of
the historic district as set forth in the historic district design guidelines and standards
adopted by the planning commission and as set forth in the United States Secretary of
the Interior's Standards for Rehabilitation.
In reviewing the proposed project for Architectural Review Certification, Staff referenced the
Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of
the Design Standards and Guidelines which present the Recommended, Not Recommended, and
Inappropriate approaches to activities in the Historic District. The Design Standards and
Guidelines limit the height of fences to four feet and specifies appropriate materials for fencing.
This project proposes the placement of a six-foot fence which exceeds the recommended height
in the Historic District. Therefore, I am referring the Fence Permit application to the Historic
District Commission for consultation. See Zoning Ordinance, Article 10 Section 3.22 (A) and
(B) listed below.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 30
Page 31
Item 6.
Letter Re: Permit #23-781 Fence at 147 S. New Street, Dover
May 16, 2023
Page 2 of 2
Section 3.22 Architectural review certification by the city planner.
(A) An architectural review certificate for specific classes of building permits, including
fences, signs, siding, window and door replacement, roofing, the addition or replacement
of decorative features, minor demolition, residential additions, and other construction of
a minor nature, may be issued by the city planner, after a review and determination that
the proposed construction is in general accordance with the standards set forth in
subsection 3.25
(B) The city planner may refer any permit application for demolition or construction in the
historic district for consultation with commission.
The City of Dover Historic District Commission will review this Permit at their next
meeting scheduled for Thursday, May 18, 2023 at 3:30pm. Options for participating in the
Meeting include attending In-Person at the City Hall Conference Room and or attending
the Virtual Meeting presentation using WebEx, an audio and video conferencing system. A
separate meeting invitation to Join the Meeting virtually will be sent by email to the
applicants; where you can clink “Join Meeting” to attend that afternoon. This Permit
Referral has been assigned Application #HI-23-02. You are encouraged to participate in this
meeting to discuss the project. Staff will provide the Historic District Commission with the
permit application materials and other background information for their review and action.
Also attached to this Letter are the Design Standards and Guidelines for the City of Dover
Historic District Zone pertaining to Fencing (pages 3-26 and 3-27). If you have questions or wish
to discuss alternative options, please contact the Planning Office at (302)736-7196.
Sincerely,
Department of Planning and Inspections
Dawn Melson-Williams, AICP
Principal Planner
CC: Tina Bradbury, Downtown Dover Partnership tina@downtowndoverpartnership.com
Fence Permit #23-781
HI-23-01
31
Page 32
Item 6.
32
Page 33
Item 6.
33
Page 34
Item 6.
34
Page 35
Item 6.
35
Page 36
Item 6.
36
Page 37
Item 6.
37
Page 38
Item 6.
City of Dover
ARCHITECTURAL REVIEW REPORT
Referral by City Planner to Historic District Commission
Meeting of May 18, 2023
Permit: Fence Permit #23-781
Location: 147 S. New Street, Dover
Located on the east side of South New Street to the north of (but not
adjacent to) West Loockerman Street
Tax Parcel: ED-05-077.09-01-48.00-000
File Number: HI-23-01
Present Zoning: C-2 (Central Commercial Zone)
H (Historic District Zone)
Referral of Permit:
The following application Fence Permit #23-781 for 147 S. New Street is referred by the City
Planner to the Historic District Commission for consultation regarding the issuance of the
Architectural Review Certificate for a Fence project. Applications for certain types of
construction activity within the Historic District Zone (H) are reviewed by the City Planner (or
Staff as designated) for Architectural Review Certification as part of the Building Permit
application review process. Staff is referring the Permit for review under the provisions of
Zoning Ordinance, Article 10 Section 3.22(A) and (B). See below.
Section 3.22 Architectural review certification by the city planner.
(A) An architectural review certificate for specific classes of building permits, including
fences, signs, siding, window and door replacement, roofing, the addition or replacement
of decorative features, minor demolition, residential additions, and other construction of a
minor nature, may be issued by the city planner, after a review and determination that the
proposed construction is in general accordance with the standards set forth in subsection
3.25.
(B) The city planner may refer any permit application for demolition or construction in the
historic district for consultation with commission.
Permit Proposal:
Fence Permit #23-781 was filed on May 12, 2023 for a fence project at 147 S. New Street in
Dover, Delaware. The Project outlined in the Permit submission involves placement of a six-foot
vinyl fence along the south property line spanning from the restaurant building at 147 S. New
Street to the building located on 231 W. Loockerman Street. This fence is to replace an existing
wood fence that is damaged. The fence segment is not visible due to the demolition of the
building on the adjacent property at 235-239 West Loockerman Street.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 38
Page 39
Item 6.
HI-23-02 Referral of Fence Permit #23-781 147 S. New Street
Staff Report to the Historic District Commission
Page 2 of 3
The project site is located within the local Historic District Zone (H) and subject to the
provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. This building is also
located within the boundaries of a National Register Historic District, specifically the Victorian
Dover Historic District.
Staff Review of Permit for Architectural Review Certification:
Project activities are reviewed for compliance with the Zoning Ordinance and the Design
Standards and Guidelines for the City of Dover Historic District Zone as stated in Zoning
Ordinance, Article 10 Section 3.25(A).
3.25 Architectural review standards.
(A) An architectural review certificate may be issued if it is found that the architectural
style, general design, height, bulk and setbacks, arrangement, location and materials
and structures affecting the exterior appearance are generally in harmony with
neighboring structures and complementary to the traditional architectural standards of
the historic district as set forth in the historic district design guidelines and standards
adopted by the planning commission and as set forth in the United States Secretary of
the Interior's Standards for Rehabilitation.
The current location of this fence segment is in the “public view”, and it is deemed visible from
the public ways of the adjacent streets. Public view is defined in the Zoning Ordinance as “that
which can be seen readily from a public street, public building or public property, excluding
views from alley rights-of-way.”
In reviewing the proposed project for Architectural Review Certification, Staff referenced
various sections of Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing
Historic Buildings of the Design Standards and Guidelines for the City of Dover Historic
District Zone which presents the Recommended, Not Recommended, and Inappropriate
approaches to construction of various elements in the Historic District.
This Request should be reviewed for conformity with the design criteria and development
guidelines found in the Design Standards and Guidelines for the City of Dover Historic District
Zone. Specifically, Chapter 3 page 3-26 includes the discussion of fences in the Historic District
zone where it states that site fences and walls “should not exceed 4’0” in height and then
discusses the Recommended, Not Recommended, and Inappropriate practices associated with
fences and walls as related to materials. Chapter 3 presents the information on the appropriate
fence materials for use in the Historic District. Wood picket style fences and cast iron (metal)
fencing are Recommended.
Staff also looked at the provisions for fences in the Zoning Ordinance. The Zoning Ordinance
limits the height of fences to four (4) feet within the front yard setback (Article 5 §1.55) with
other provisions for increases fence height to 6.5 feet for side yards, rear yards, and the second
front yard on corner lots.
Historic District Commission Action
The Historic District Commission should consider the proposal for the fence project and take action
in regard to the Architectural Review Certification for the Fence Permit #23-781. The Historic
39
2
Page 40
Item 6.
HI-23-02 Referral of Fence Permit #23-781 147 S. New Street
Staff Report to the Historic District Commission
Page 3 of 3
District Commission may add conditions for the fence in order to comply with the character of the
property within the Historic District.
Staff Findings from Review of Building Permit:
Staff findings and recommendations are summarized as follows for the proposed fence project as
presented in Permit #23-781 and accompanying documents.
1. Fence Location: The proposed fence is to be located along a side property line. The
fence segment runs from the rear of the restaurant building at 147 S. New Street east until
it meets the rear of an adjacent building located on the property at 231 W. Loockerman
Street.
2. Fence Visibility: The fence segment is now visible due to the demolition of a building on
the adjacent property at 235-239 West Loockerman Street. If the adjacent building was
still there, then this fence segment would not be subject to Architectural Review
Certification and could be approval for the proposed height and material.
3. Fence Height – 6 ft. along a side property line: The Design Standards and Guidelines say
that generally the height of a fence should not exceed 4 feet. The proposed 6 feet fence
exceeds the recommended height of the Design Standards and Guidelines. There is an
existing wood fence at this location that appears to be approximately 6 feet in height. The
existing fence would be considered legal non-conforming and could be repaired as a
wood fence. This height could also be authorized for a replacement fence if found to be
compatible.
4. Fence Material: The proposed fence is to be made of white vinyl as a solid panel between
posts system. The use of vinyl products is typically not recommended for use in the
Historic District; however, there are examples that have been approved for fences with
conditions for use of wood products, materials with a wood grained appearance (non-
shiny), or other composite materials in a neutral color (tan/clay).
Advisory Comments and Recommendations:
1. The applicant shall be aware that issuance of a Fence Permit is required prior to the
commencement of construction. The Fence Permit Application will be subject to the
conditions of approval established and may be required to be updated if necessary, to
comply with these conditions established through the Architectural Review Certification
process.
Attachments:
• Letter of Referral Notice to Applicant dated May 16, 2023
• Building Permit #23-781 Application Form and Permit submission documents
• Design Standards and Guidelines for the City of Dover Historic District Zone, Chapter 3,
page 3-26.
40
3
Page 41
Item 6.
41
Page 42
Item 6.
42
Page 43
Item 7.
City of Dover Code of Ordinances
Appendix B: Zoning Ordinance
Article 3 - District Regulations
Section 21. - Historic district (H).
21.1 Purpose. The purpose of this historic district regulation is to preserve and enhance
that unique character and value of the old portion of Dover as an area of special charm and
interest. It is particularly intended that the regulations prevent, in the historic district, any
change of conditions that would be deemed to be a disfigurement or degradation of the
present unique visual and architectural qualities of the district.
21.2 [Use and bulk requirements.] In the historic district, use[s] and bulk shall be governed
by those provisions of this ordinance related to the zone designation of each property, except
those aspects of building height, bulk and setback that are subject to architectural review as
set forth in article 10, section 3 of this ordinance.
21.3 [Architectural review certificate.] An architectural review certificate shall be required for
the demolition, construction, reconstruction, alteration or restoration of any new or existing
structure or where general exterior repairs are made within the historic district, as provided in
article 10, section 3 of this ordinance.
21.4 [Amendments, supplements and repeals.] The city council shall not take any action to
amend, supplement, or repeal the historic district in accordance with article 10, section 5,
amendments, without a report by the historic district commission in accordance with article
10, section 3.3, unless the historic district commission fails to render such a report within 75
days after its regularly scheduled meeting following referral by the city council.
21.5 [[Signs.] Signs shall meet the regulations found in article 5, section 4, supplementary
sign regulations.
(Ord. of 3-24-1986; Ord. of 7-26-1993; Ord. of 2-12-2001)
Ordinance Excerpts for Historic District 11-12-2020 Page 1 of 10 43
Page 44
Item 7.
City of Dover Code of Ordinances
Appendix B: Zoning Ordinance
Article 10 – Planning Commission
Section 3. - Historic district commission and architectural review.
3.1 Historic district commission established.
3.11 Creation and purpose. There shall be a historic district commission for the
purpose of assisting the planning commission and city planner in reviewing
applications for architectural review certifications as specified in subsection 3.2; and
for making recommendations for designation of historic district zones; and for
establishing guidelines for the preservation and conservation of historic district
zones; and for advising other officials and departments in the City of Dover in matters
concerning historic preservation; and for reviewing all proposed National Register
nominations in the City of Dover; and for acting as a liaison on behalf of the City of
Dover to individuals and organizations concerned with historic preservation; and for
carrying out programs of historic preservation education in the City of Dover.
3.12 Appointment. The commission shall consist of five members nominated by the
mayor and approved by the city council, who are residents of the City of Dover and
who have demonstrated special interest, experience, or knowledge in history,
architecture, or historic preservation. Two of the members, to the extent available,
shall be professional members representing the professions of architecture, history,
archaeology, planning, historic preservation or related disciplines. At least two
members shall be residents of the district, and at least one shall represent the
business within the district.
3.13 Term. The members of the commission shall serve for three-year staggered
terms. Vacancies shall be filled within 60 days in accordance with subsection 3.12.
3.14 Organization. The commission shall meet at least four times per year in a
place that is advertised in advance and open to the public and shall keep minutes of
its meetings that are available to the public. All review decisions shall be made in
public. The commission shall establish bylaws for its general procedure, which shall
include a section addressing conflicts of interest. The commission shall produce an
annual report of its activity that is kept on file for public review with the city planning
office.
3.2 Architectural review certification.
3.21 Effect of architectural review certificate. No building permit or certificate of
occupancy may be issued for any structure in the historic district until an architectural
review certificate is issued as required under article 3, section 21, subsection 21.3 for
the historic district.
3.22 Architectural review certification by the city planner.
(A) An architectural review certificate for specific classes of building permits,
including fences, signs, siding, window and door replacement, roofing, the
addition or replacement of decorative features, minor demolition, residential
additions, and other construction of a minor nature, may be issued by the city
planner, after a review and determination that the proposed construction is in
general accordance with the standards set forth in subsection 3.25.
Ordinance Excerpts for Historic District 11-12-2020 Page 2 of 10 44
Page 45
Item 7.
(B) The city planner may refer any permit application for demolition or
construction in the historic district for consultation with commission.
(C) All decisions of the city planner pursuant to this subsection shall be
documented on the building permit. When the city planner grants a
conditional approval under this section, all conditions of approval shall be set
forth in writing on the building permit. In the event of a denial, the reasons for
such denial shall be documented in a written notice of decision which shall
identify all elements of the application found to be contrary to the provisions
or intent of this section.
(D) An applicant may appeal the decision of the city planner to the historic
district commission and such appeal shall be considered as an architectural
review certification application to the historic district commission and shall
meet all of the requirements set forth in subsection 3.23.
3.23 Architectural review certification by the historic district commission.
(A) The historic district commission shall issue architectural review
certificates for the construction or demolition of single-family and two-family
homes, and nonresidential structures or additions involving a gross floor area
of 3,000 square feet or less, after review of the proposed construction and
after a determination that the construction is in general accordance with the
standards set forth in subsection 3.25 below.
(B) All applications to the historic district commission for architectural review
certification shall be subject to the procedures set forth in subsection 3.26.
(C) All decisions of the historic district commission pursuant to this
subsection shall be formalized in a written notice of decision. When the
commission grants a conditional approval under this subsection, all
conditions of approval shall be set forth in writing in the notice of decision. In
the event of a denial, the notice of decision shall state the reasons for denial
and shall identify all elements of the application found to be contrary to the
provisions or intent of this subsection.
(D) An applicant may appeal the decision of the historic district commission
to the planning commission, and such appeal shall be considered as an
architectural review certification application to the planning commission and
shall meet all of the requirements set forth in subsection 3.24 and subsection
3.26.
3.24 Architectural review certification by the planning commission.
(A) The planning commission shall issue architectural review certificates
referred or appealed to it, upon review of the recommendations of the historic
district commission and upon a determination that the proposed construction
is in accordance with the standards set forth in subsection 3.25.
(B) All applications to the planning commission for architectural review
certification shall be subject to the procedures set forth in subsection 3.26.
(C) All decisions of the planning commission pursuant to this subsection
shall be formalized in a written notice of decision. When the planning
commission grants a conditional approval under this subsection, all
conditions of approval shall be set forth in writing in the notice of decision. In
the event of a denial, the notice of decision shall state the reasons for denial
Ordinance Excerpts for Historic District 11-12-2020 Page 3 of 10 45
Page 46
Item 7.
and shall identify all elements of the application found to be contrary to the
provisions or intent of this subsection.
3.25 Architectural review standards.
(A) An architectural review certificate may be issued if it is found that the
architectural style, general design, height, bulk and setbacks, arrangement,
location and materials and structures affecting the exterior appearance are
generally in harmony with neighboring structures and complementary to the
traditional architectural standards of the historic district as set forth in the
historic district design guidelines and standards adopted by the planning
commission and as set forth in the United States Secretary of the Interior's
Standards for Rehabilitation.
(B) The city planner, historic district commission or planning commission
shall not consider normal maintenance and repair (see Definitions, article
12), interior arrangement, or building features not subject to public view.
3.26 Procedures for an architectural review by the historic district commission
and/or planning commission.
(A) Architectural preapplication meeting. Prior to action on any application
for an architectural review certificate, the applicant shall meet in person with
the city planner or his delegated representative. The purpose of such
conference shall be to discuss the proposed construction or other action
requiring the certificate in order to determine what information is useful in the
determination of conformity with the provisions and intent of the historic
district regulation as expressed in this article.
(B) Application and fee. The application to the historic district commission for
an architectural review certificate and related information shall be submitted
to the city planner at least 30 days prior to the historic district commission
meeting at which review is requested and shall be accompanied by a fee as
provided for in Appendix F—Fees and Fines.
(C) Public hearing. Prior to the review and action on an architectural review
certification, the historic district commission shall hold a public hearing
subject to the following public notification procedures:
(1) The applicant shall advertise the public hearing newspaper of
general circulation at least 15 days prior thereto.
(2) The applicant shall notify, by mail, all property owners within 200
feet of the extreme limits of the subject property as their names
appear on the municipal tax record at least 15 days prior thereto.
(3) The applicant shall post a notice outlining the date, time, place,
and nature of the hearing in a conspicuous location on the
property. Such notice shall be designed in accordance with
standards set forth by the planning commission.
(4) The applicant shall provide the planning office with a copy of the
notice, verification of newspaper publication, a date-stamped photo of
the property posting, and post office mail receipts indicating date of
mailing for all letters on or before the meeting date.
(5) Said notices shall state the date, time, and place of the hearings
before the historic district commission, a brief description of the
Ordinance Excerpts for Historic District 11-12-2020 Page 4 of 10 46
Page 47
Item 7.
project and shall state that a copy of the application and plan is on file
with the planning office for public review.
(6) If the planning commission is reviewing a project in accordance
with other sections of this article, then the public hearing notice on
those applications must also give notice of architectural review
certification.
(D) Application information. The applicant shall provide such information and
documents listed below which will satisfactorily illustrate the proposed action
as indicated in the architectural preapplication meeting required in subsection
3.26(A):
(1) All plan elements required in subsection 2.5.
(2) Plans and specifications indicating existing and proposed
development, including structures, architectural elevation
drawings, trees and any other landscaping, existing and
proposed, including the general design, location and orientation
of structures in relation to curb line, right-of-way line and
neighboring buildings, colors, and materials to be used on
exterior surfaces, detailed plans for any signs, photographs of the
existing site and neighboring buildings, and such other
information as will enable the historic district commission or
planning commission to determine conformity with the ordinance.
(E) City planner report. For each application to the planning commission the
city planner shall issue a report to the planning commission including
comments from other agencies detailing how the application conforms to the
requirements of the zoning ordinance and other provision of city and state
codes. This report shall not be deemed to represent a comprehensive list of
all city and state code requirements. The city planner shall transmit copies of
the proposed site development plan and the city planner's report at least
seven days prior to the date of the meeting at which approval of the site
development plan is to be requested.
(F) Historic district commission action. The historic district commission shall
act to review and render a recommendation to approve any such application
within 45 days of transmittal to the commission or within such additional time
as may be consented to by the applicant. The recommendation of the historic
district commission shall be forwarded to the planning commission and acted
upon by the planning commission in conjunction with action on the
associated site development plan. If a site development plan application is
not filed in accordance with the provisions of subsection 2.4 of this article
within one year of recommendation, the recommendation shall expire. The
historic district commission may grant a one-year extension of its
recommendation upon written request by the applicant. Such request shall be
made in writing to the planning office at least thirty days prior to the expiration
of the historic district commission's recommendation.
(G) Substantial amendments. Substantial amendments to an application or
an architectural review certificate shall be acted upon in the same manner as
the original plan.
(H) Expiration of architectural review certification issued by the historic
district commission.
Ordinance Excerpts for Historic District 11-12-2020 Page 5 of 10 47
Page 48
Item 7.
(1) Architectural review certification approval shall expire on the last
day of the 12th month after the date of approval if construction of
the work authorized or use permitted has not started or unless an
extension of time is applied for by the applicant and granted by
the historic district commission. Approval shall also expire if the
construction of work authorized has stopped for a period of one
year unless an extension of time is applied for and granted by the
historic district commission.
(2) Request for extension of approval shall be made no later than 30
days prior to the final approval expiration date. Upon receipt of
such request, the matter shall be considered at the next regularly
scheduled meeting of the historic district commission.
(3) In considering a request for an extension of approval, the historic
district commission shall consider, but not be limited to, the
following:
(a) Whether the project has been delayed for reasons
beyond the control of the applicant, excluding economic
or financial reasons.
(b) Whether the applicant has made substantial progress
toward obtaining final approvals.
(c) Whether there have been any significant changes in the
surrounding neighborhood.
(d) Whether there has been any related amendments to the
zoning map or text, or the comprehensive plan, or if any
waivers or variances have been granted.
(4) Requests for extensions shall be submitted in writing to the
planning office.
(5) Under no circumstances shall the historic district commission
grant extensions beyond 24 months from the date of first
approval.
3.3 Historic district amendments.
3.31 Historic district commission review required. Any motion or petition to amend,
supplement, or repeal a historic district by the city council in accordance with section
5, Amendments, shall require a report by the historic district commission as set forth
in article 3, subsection 21.4.
3.32 Review criteria for placing individual structures in a historic district. The historic
district commission may recommend that an individual structure or property be
placed in an existing contiguous historic district or be placed in a historic district
specifically created for the property or structure upon considering the following
criteria and factors:
(A) Significant value as part of the historical, cultural, artistic, social, ethnic or
other heritage of the nation, state or community;
(B) Association with an important person or event in national, state, or local
history.
(C) Representative of the distinguishing characteristics of an architectural
type inherently valuable for the study of a period, style, craftsmanship,
method of construction or use of indigenous material;
Ordinance Excerpts for Historic District 11-12-2020 Page 6 of 10 48
Page 49
Item 7.
(D) Notable work of a master builder, designer, architect, or artist whose
individual genius has influenced an era;
(E) The desire of the owner to have the property designated;
(F) Increased potential of economic or community development.
3.33 Review criteria for amendments or creation of new historic districts. The
historic district commission may recommend amendments to an existing historic
district, recommend repeal of an existing historic district or recommend the creation
of a new historic district upon considering the following criteria:
(A) Any criteria listed in subsection 3.32.
(B) Distinctive character or homogeneity of architectural design or dates of
construction throughout the area.
(C) Identifiable by clear and distinctive boundaries.
(D) Repetition of distinguishing architectural or land use characteristics
throughout the area.
3.34 Public hearing required. For all proposed amendments to the boundary of the
historic district, the historic district commission shall hold a public hearing subject to
the following public notification procedures:
(A) The planning office shall advertise the public hearing in a newspaper of
general circulation at least 15 days prior thereto.
(B) The planning office shall notify, by mail, all directly affected property
owners and all property owners within 200 feet of the extreme limits of
the properties proposed for addition to or removal from the district as
their names appear on the municipal tax record at least 15 days prior
thereto.
3.4 Demolition by neglect.
3.41 Responsibility of property owners. Property owners of properties within the
historic districts shall not allow their buildings to be demolished by neglect (see
Definitions, article 12) by failing to provide ordinary maintenance or repair.
3.42 Responsibility of the historic district commission. The historic district
commission shall monitor the condition of historic properties and existing buildings in
the historic district to determine if they are being demolished by neglect by failing to
provide ordinary maintenance and repair (see Definitions, article 12). In the event
that the commission determines a demolition by neglect is occurring, it shall carry out
the following:
(A) Determine and set forth steps required to remedy the situations or
defects.
(B) Direct the city planner to inform the property owners of its findings,
determination, and recommended remedies.
(C) In the event that the property owners fail to commence work within the
reasonable time allotted by the commission, the commission may direct
the building inspector to begin proceedings under chapter 22, buildings,
and building regulations, article XI, dangerous buildings, of the Code of
Ordinances for the City of Dover to bring about the repair or demolition of
the building.
Ordinance Excerpts for Historic District 11-12-2020 Page 7 of 10 49
Page 50
Item 7.
3.43 Responsibility of the city planner. The city planner shall notify the historic
district commission of buildings within the historic district that have been referred to
him by the building inspector that meet the definition of dangerous buildings under
the provisions of chapter 22 Buildings and Building Regulations, article XI Dangerous
Buildings, of the Code of Ordinances for the City of Dover. In such cases the
commission shall determine if the building is being demolished by neglect. Before
referring a property to the commission for consideration as demolition by neglect, the
city planner shall give written notice to the owner, occupant, mortgagee, lessee,
agent, and all other persons having an interest in said building, as shown by the
records of the recorder of deeds of the county, to appear before historic district
commission at the time, date and location specified.
(Ord. No. 2011-14, 8-8-2011)
Section 4. - Development information requirements.
4.1 In order to more effectively evaluate the probable impact of proposed development and
thereby to carry out the purposes of this ordinance when making decisions and recommendations
regarding development proposals, the planning commission, historic district commission, or city
planner may adopt a standard set of information requirements, which may be updated from time to
time as necessary.
4.2 The information requirements shall be administered by the city planner and shall be a
part of submission requirements for all applications to the planning commission.
(Ord. No. 2011-14, 8-8-2011)
Ordinance Excerpts for Historic District 11-12-2020 Page 8 of 10 50
Page 51
Item 7.
City of Dover Code of Ordinances
Appendix B: Zoning Ordinance
Excerpt of Definitions associated with Historic District activities.
Article 12 - Definitions
Unless otherwise expressly stated, the following terms shall, for the purpose of this
ordinance, have the following meanings. Words used in the present tense include the future.
The singular includes the plural and the plural includes the singular. The word "person"
includes a corporation, association or partnership, as well as an individual. The word "lot"
includes the word "plot." The term "occupied" or "used," as applied to any building, shall be
construed as though followed by the words "or intended, arranged or designed to be
occupied or used":
Accessory building: A building or use clearly incidental or subordinate to, and
customar[il]y in connection with, the principal building or use on the same lot.
Applicant: A landowner or developer, as hereinafter defined, who has filed
application for development, including his heirs, successors and assigns.
Architectural review certificate: A signed and dated document indicating the approval
of the City of Dover Planning Commission, or the historic district commission, or city planner
upon the authority of the historic district commission, for alteration, construction, relocation,
or demolition within the historic district.
Building: Any combination of materials forming a construction. The term "building" is
not intended to include underground construction which permits the use of the ground above
as if no construction existed. The term "building" shall include the term "structure," as well as
the following:
(a) Signs;
(b) Fences;
(c) Walls, except retaining walls projecting above the ground not more than three
feet at the higher ground level and not more than 6½ feet at the lower ground
level;
(d) Radio and television antennae, except for such antennae installed on the roof of
a building and extending not more than 15 feet above the highest level of the roof
of such building; and
(e) Porches, carports, bins and other similar structures;
(f) All areas used for outdoor display and storage of products for sale on the site for
more than 14 consecutive days or 21 days in a calendar year. Excluded from this
definition are approved motor vehicle, boat and trailer sales establishments;
contractors' yards; nurseries and landscaping material sales (where the sale of
these materials is the primary use on the lot); wholesale building supply stores
and lumber yards; or similar uses.
Demolition by neglect: Improper maintenance or lack of maintenance of a building,
structure or object which results in substantial and widespread deterioration of the building,
structure or object which threatens the likelihood of preservation and which presents a threat
to the public safety, health and welfare of the immediate community.
Ordinance Excerpts for Historic District 11-12-2020 Page 9 of 10 51
Page 52
Item 7.
Historic district: The geographic areas of Dover that have been designated by the
City of Dover, and graphically illustrated on the official zone map of the City of Dover, as
possessing a significant concentration of properties, buildings, structures or objects
associated with and representative of the historical development of Dover and which meet at
least one of the following criteria:
(a) Exemplifies or reflects the broad cultural, political, economic, or social history of
Dover, Kent County, the State of Delaware, or the United States of America; or
(b) Is associated with the lives of persons of historic importance or with events of
historic significance to Dover, Kent County, the State of Delaware, or the United
States of America; or
(c) Embodies distinguishing architectural characteristics which are invaluable
resources for the study, understanding and appreciation of periods, styles,
society, methods of construction, craftsmanship and the use of indigenous
materials; or
(d) Represents the notable work of master builders, designers or architects whose
designs, construction and craftsmanship have been recognized as distinctive and
whose work has influenced the period of time in which they lived.
Historic district design guidelines and standards: The document adopted by the City
of Dover Planning Commission as being the source reference document for construction and
maintenance of buildings, structures and additions within the Dover Historic District and
which is the guiding document for the historic district commission and city planner in their
review of applications for architectural review certification.
National Register of Historic Places: A federal list of cultural resources worthy of
preservation, authorized under the National Historic Preservation Act of 1966 as part of a
national program to coordinate and support public efforts to identify, evaluate, and protect
the nation's historic and archaeological resources. The national register program is
administered by the state historic preservation office and by the National Park Service under
the department of the interior.
Ordinary maintenance and repair: Work performed to prevent deterioration of a
building, structure or object, or any part thereof, by restoring the building, structure or object
as nearly as practical to its original condition prior to such deterioration or damage by using
replacement materials and applications, wherever possible, of the kind used in original
construction.
Public view: That which can be seen readily from a public street, public building or
public property, excluding views from alley rights-of-way.
Ordinance Excerpts for Historic District 11-12-2020 Page 10 of 10 52
Page 53
Item 7.
Dover Code of Ordinances, Appendix B: Zoning
Article 10 – Planning Commission
Section 5. Amendments.
This article or any part thereof may be amended, supplemented or repealed, from time to time, by the city
council on its own motion or upon application, as provided in chapter 3 of title 22, Municipalities of the Delaware
Code Annotated (22 Del. C. § 301 et seq.). Every such proposed amendment shall be referred by the city council to
the planning commission for a report before the public hearing. The city council shall not take action on any such
amendment without a report from the planning commission unless the planning commission fails to render such a
report within 75 days after its regularly scheduled meeting following such referral.
5.1 Types of amendments to the ordinance. The following are the types of amendments that may be made
to the ordinance:
5.11 Zoning text amendments. Amendments to ordinance text may be made upon initiation of the city
planner or under sponsorship of three members of city council.
5.12 Map amendment by application. A property owner may make application to the city for
amendment of the zoning map as it relates to his property. Amendments to the zoning map may
also be initiated by sponsorship of three members of city council and shall be considered under
the procedures of subsection 5.3 as it relates to applications for map amendments.
5.13 Comprehensive zoning map amendment. Amendment to the zoning map as a result of a new,
revised, or amended comprehensive plan, or other formal plan or study shall be considered as a
comprehensive zoning map amendment and shall be initiated by the planning office.
5.2 Procedure for zoning text amendments in accordance with subsection 5.11.
5.21 Public hearing and notice. An amendment to the ordinance text shall be subject to public hearing
before the planning commission and city council prior to adoption. Such hearing shall be
advertised in a newspaper of general circulation at least 15 days prior to the planning
commission hearing. Such notices shall state the date, time and place of the planning commission
and city council hearings and a brief description of the proposed zoning text amendment, and
specify that documents are available in the planning office for review.
5.22 City planner report. For each proposed zoning text amendment, the city planner shall issue a
report to the planning commission and city council, including comments from other reviewing
agencies, that evaluates the following factors:
(A) Whether such change is consistent with the aims and principles embodied in the ordinance
as to the particular zones concerned; and
(B) Whether such proposed amendment is consistent with the aims of the comprehensive plan
of the city.
5.23 Report of the planning commission. Regarding each proposed amendment to the ordinance text,
the planning commission shall provide a report to the city council stating a recommended action
with regards to the proposed amendment, along with the commission's evaluation of the
following factors:
(A) Whether such change is consistent with the aims and principles embodied in the ordinance
as to the particular zones concerned; and
Created: 2023-05-02 10:49:42 [EST]
(Supp. No. 38, Update 1)
Page 1 of 5
53
Page 54
Item 7.
(B) Whether such proposed amendment is consistent with the aims of the comprehensive plan
of the city.
5.3 Application procedure for zoning map amendments in accordance with subsection 5.12.
5.31 Preapplication meeting. Prior to the submission of a zoning map amendment application, the
applicant or his representative shall meet in person with the city planner or his designee to
discuss the rezoning request. The purpose of this meeting shall be to discuss proposed uses or
developments and to review the process and submission requirements.
5.32 Application. Application for a zoning map amendment shall be submitted to the city planner, on
forms approved by the planning commission, along with a fee as provided for in Appendix F—
Fees and Fines, and copies of a site map as described below.
(A) Submission requirements accompanying applications for amendments to the zoning map.
The applicant shall cause a site map to be prepared by a civil engineer, surveyor, land
planner, or architect. The applicant shall submit copies of the site map to the city planner.
The elements to be included on the site map are listed below:
(1) Scale and dimensions. The map shall be at least 8.5 by 11 inches and at a scale
of ten, 20, 30 or 40 feet to the inch, except that if the property has a maximum
dimension over 900 feet, a scale of 50 feet to the inch may be used.
(2) Legal data.
(a) Tax parcel identification number.
(b) Name and address of the owner of record.
(c) Name and address of the equitable owner, if any.
(d) Name and address of the person, firm or organization preparing the map.
(e) Date, north point and written and graphic scale.
(f) Sufficient description of information to precisely define the boundaries of
the property and that portion of the property for which a rezoning is
requested; and total acreage for which a rezoning is requested. All
distances shall be in feet and hundredths of a foot. All angles shall be
given to the nearest second or closer. The error of closure shall not
exceed one in 10,000.
(g) The locations, names and existing widths of adjacent street rights-of-way
and curblines.
(h) Location, width and purpose of all existing and proposed easements,
reservations and areas dedicated to public use within or adjoining the
property.
(i) Existing and proposed zoning.
(j) Any existing development on the property, including buildings, fences
and landscape screening.
(k) Full and complete information requested by the city planner in
accordance with the development information requirements set forth in
section 4.
Created: 2023-05-02 10:49:42 [EST]
(Supp. No. 38, Update 1)
Page 2 of 5
54
Page 55
Item 7.
5.33 Setting of hearings and referral to planning commission. For any application to amend the zoning
map, city council shall refer the proposed amendment to the planning commission and set dates
for the public hearings to be held before the planning commission and city council.
5.34 Advertisement of public hearing. Following referral of a zoning map amendment application to
planning commission by city council, the applicant shall advertise the public hearing as follows:
(A) The applicant shall notify by mail all property owners within a distance of 200 feet of the
extreme limits of the subject property of the public hearing dates, times and locations.
(B) The applicant shall advertise the public hearings in a newspaper of general circulation at
least fifteen (15) days prior to the planning commission hearing. Such notices shall state
the date, time and place of the planning commission and city council hearings and a brief
description of the proposed zoning map amendment, and specify that documents are
available in the planning office for review.
(C) The applicant shall also post a notice outlining the date, time, place, and nature of the
hearings in a conspicuous location on the property. Such notice shall be designed in
accordance with standards set forth by the planning commission and city council.
(D) The applicant shall provide the planning office with a copy of the notice, verification of
newspaper publication, a date-stamped photo of the property posting, and post office mail
receipts indicating the date of mailing for all letters on or before the planning commission
meeting date.
5.35 City planner report. For each application for a zoning map amendment, the city planner shall
transmit a report to the planning commission and city council, including comments from other
reviewing agencies that evaluate the following factors:
(A) Whether the uses permitted by the proposed change would be compatible with the
existing uses and zones in the area concerned;
(B) Whether adequate public services and infrastructure exist or can be created or expanded
to serve the needs of any additional demand as a result of such change; and
(C) Whether the proposed change is in accordance with the city's current comprehensive plan.
5.36 Report of the planning commission. Regarding each application for a zoning map amendment, the
planning commission shall provide a report to the city council stating a recommended action with
regards to the proposed amendment, along with the commission's evaluation of the following
factors:
(A) Whether the uses permitted by the proposed change would be compatible with the
existing uses and zones in the area concerned;
(B) Whether adequate public services and infrastructure exist or can be created or expanded
to serve the needs of any additional demand as a result of such change; and
(C) Whether the proposed change is in accordance with the city's current comprehensive plan.
5.37 Amendment of zoning map. Following action by city council with regards to an application to
amend the zoning map, the planning office shall update the zoning map to reflect the action of
city council.
5.38 Notice of decision. The city clerk shall send the applicant a letter notifying the applicant of the city
council's action regarding the application for a zoning map amendment.
5.4 Procedure for comprehensive zoning map amendment in accordance with subsection 5.13.
Created: 2023-05-02 10:49:42 [EST]
(Supp. No. 38, Update 1)
Page 3 of 5
55
Page 56
Item 7.
5.41 Public hearing and notice. A comprehensive zoning map amendment shall be subject to public
hearing before the planning commission and city council prior to adoption. The planning office
shall advertise the public hearings as follows:
(A) The planning office shall advertise the public hearing in two newspapers of general
circulation at least 15 days prior to the planning commission hearing.
(B) The planning office shall notify all affected property owners by mail at least 15 days prior to
the planning commission hearing, informing them of the proposed zoning map amendment
as it relates to their property.
(C) Such notices shall state the date, time and place of the planning commission and city
council hearings and a brief description of the proposed zoning map amendment, and
specify that documents are available in the planning office for review.
5.42 City planner report. For any comprehensive zoning map amendment, the city planner shall issue a
report to the planning commission and city council, including comments from other reviewing
agencies, that identifies:
(A) The reasons for the comprehensive zoning map amendment;
(B) All properties where a change in zone is proposed; and
(C) How the proposed changes to the zoning map support the city's current comprehensive
plan.
5.43 Report of the planning commission. Regarding each application for a comprehensive zoning map
amendment, the planning commission shall provide a report to the city council stating a
recommended action with regards to the proposed amendment, along with the commission's
evaluation of the following factors:
(A) Whether the uses permitted by the proposed change would be compatible with the
existing uses and zones in the area concerned;
(B) Whether adequate public services and infrastructure exist or can be created or expanded
to serve the needs of any additional demand as a result of such change; and
(C) Whether the proposed change is in accordance with the city's current comprehensive plan.
5.44 Adoption of comprehensive zoning map amendment. Upon adoption of the comprehensive
zoning map amendment by city council, the zoning of properties shall be as reflected in the
adopted map.
5.45 Notice of decision. The city shall notify all affected property owners in writing with regards to any
amendments to the zoning map that affect their properties.
5.5 Amendment protests. In the case of a protest against any amendment, such amendment shall not
become effective, except in accordance with the provisions of section 305 of chapter 3 of title 22,
Municipalities, of the Delaware Code Annotated (22 Del. C. § 305).
5.6 Zoning map amendment approvals. In all cases where the city council shall approve an amendment to
the zoning map, the said council shall find that, for reasons fully set forth in the said findings, such
amendment is in conformity with the comprehensive plan for the city.
5.61 Reconsideration, one-year limitation.
(A) Whenever an amendment has been denied by the city council, such amendment, or one
substantially similar, shall not be reconsidered sooner than one year from the date of the
prior denial, except as provided in subsection (B) hereof.
Created: 2023-05-02 10:49:42 [EST]
(Supp. No. 38, Update 1)
Page 4 of 5
56
Page 57
Item 7.
(B) Notwithstanding the provisions of subsection (A) hereof, the planning commission may
request the council to reconsider an application within the one-year period from the denial
of the same if the land use in the area has changed to such a degree that failure to do so
would prevent proper planning and development of the area in question.
5.7 Closed zones. Where the city finds that new development in a certain zone would be inconsistent with
the purposes of this article, but that elimination of or substantial changes to the zone would create a
hardship for many owners of existing buildings and land in that zone, the city may declare the zone
closed. The city council shall not accept or approve amendments to the zoning map which would place
land in a closed zone. Closed zones include:
(A) R-7;
(B) RG-4;
(C) RG-O, except in the downtown redevelopment target area as described in appendix C of the City
of Dover Code of Ordinances.
(Ord. No. 2011-14, 8-8-2011)
Created: 2023-05-02 10:49:42 [EST]
(Supp. No. 38, Update 1)
Page 5 of 5
57
Page 58
Item 7.
Historic Preservation
C I T Y O F D O V E R , D E L A W A R E
H I S T O R I C D I S T R I C T C O M M I S S I O N
D E P A R T M E N T O F P L A N N I N G & I N S P E C T I O N S
T w o T y p e s o f d e s i g n a t i o n
L o c a l H i s t o r i c d i s t r i c t
A n d
N a t i o n a l R e g i s t e r o f H i s t o r i c P l a c e s
There are two type of designation: a historic district established by
the local government through ordinances and those individual
properties or historic districts listed in the National Register of
Historic Places, a federal designation program.
The following are definitions of each type from the City of Dover’s
Zoning Ordinance.
Local Historic District
Historic district: The geographic areas of Dover that have been for Dover covers the
designated by the City of Dover, and graphically illustrated on the official corridor along Loockerman
zone map of the City of Dover, as possessing a significant concentration
Street between the railroad
of properties, buildings, structures or objects associated with and
representative of the historical development of Dover and which meet at tracks to the St. Jones River
least one of the following criteria: on the east and along the
(a) Exemplifies or reflects the broad cultural, political, economic, State Street corridor from
or social history of Dover, Kent County, the State of Delaware, or the just north of Division Street
United States of America; or to South Street. See map for
(b) Is associated with the lives of persons of historic importance specific boundaries.
or with events of historic significance to Dover, Kent County, the State of
Delaware, or the United States of America; or
(c) Embodies distinguishing architectural characteristics which
are invaluable
resources for the study, understanding and appreciation of periods,
styles, society, methods of construction, craftsmanship and the use of
indigenous materials; or
(d) Represents the notable work of master builders, designers or Within the City of Dover are
architects whose designs, construction and craftsmanship have been three National Register
recognized as distinctive and whose work has influenced the period of Historic Districts: Dover
time in which they lived. Zoning Ordinance, Article 12 Definitions Green Historic District,
Victorian Dover Historic
National Register of Historic Places: A federal list of cultural resources District, and part of the Little
worthy of preservation, authorized under the National Historic Creek Hundred Rural
Preservation Act of 1966 as part of a national program to coordinate and Historic District. The City
support public efforts to identify, evaluate, and protect the nation's historic
and archaeological resources. The National Register program is adminis-
also includes twelve (12)
tered by the state historic preservation office and by the National Park individual properties listed in
Service under the Department of the Interior. Zoning Ordinance, Article 12 the National Register.
Definitions
58
Page 59
Item 7.
P a g e 2
B a s i c D i f f e r e n c e s
The basic differences in the protection and requirements between a historic district of local
designation and National Register listing of a historic property/district:
L o c a l D e s i g n a t i o n a s a
H i s t o r i c D i s t r i c t
(As part of a Historic Preservation Ordinance)
• Designates historic properties on the basis of local criteria and local
Procedures.
• Often included as part of local zoning and land use regulations.
BENEFITS OF LOCAL
• Sets boundaries on the distribution pattern of historic properties, and other
HISTORIC DISTRICTS
community considerations.
• Local districts
• Provides recognition of a community’s significant properties. protect the investment
• Coupled with design review process, such as a historic preservation of owners and
commission or architectural review board, provides protection of character- residents.
defining exterior features of a property, but, in many cases, not historic • Local districts
interiors or archaeological sites. encourage better
design.
• May qualify a property for a form of financial assistance, such as a local
tax incentive for historic preservation, if the local government has passed a tax • Local districts help
the environment.
incentives ordinance.
• Educational
• Can provide for review of proposed demolitions within the district, and benefits
provide delays to allow for preservation alternatives to be considered. • A local district can
• Can require local commission review and approval for all changes to the result in a positive
exterior appearance of historic properties, and review approval for all economic impact from
construction, such as infill, e.g. adjacent new buildings on a site or on vacant tourism.
parcels. • The protection of
local historic districts
can enhance business
recruitment potential.
N a t i o n a l R e g i s t e r L i s t i n g
(As an honorary status with some federal financial incentives) • Local districts
provide social and
• Designates historic properties based on uniform national criteria and psychological benefits.
procedures
• Set boundaries for historic district based on the actual distribution pattern of
intact historic properties in the area.
• Provides recognition by the federal government that an area has historical or archaeological
significance.
• Requires the effects of federally assisted work projects (actions) on historic properties be con-
sidered prior to the commencement of work. Makes available federal tax incentives for qualified
rehabilitation projects. Requires conformance to the Secretary of the Interior’s Standards for Reha-
bilitation (36 CFR 67)
• Makes a property eligible for certain types of grants (when available). Work projects associated
with certain grants require conformance to the Secretary of the Interior’s Standards for the Treat-
ment of Historic Properties (36 CFR 68).
59
Page 60
Item 7.
P a g e 3
P a r t s o f a P r e s e r v a t i o n O r d i n a n c e
• Statement of purpose.
• Creation of the Historic District Commission
Refer to City of Dover • Commission duties and powers
Code of Creation and purpose. There shall be a historic district commission for
Ordinances, Appendix B: the purpose of assisting the planning commission and city planner in re-
Zoning Ordinance: viewing applications for architectural review certifications as specified in
subsection 3.2; and for making recommendations for designation of his-
Article 3 Section 21 toric district zones; and for establishing guidelines for the preservation
Historic District and conservation of historic district zones; and for advising other officials
and departments in the City of Dover in matters concerning historic
Article 10 Section 3 preservation; and for reviewing all proposed National Register nomina-
Historic District tions in the City of Dover; and for acting as a liaison on behalf of the City
Commission and of Dover to individuals and organizations concerned with historic preser-
Architectural vation; and for carrying out programs of historic preservation education in
Review the City of Dover. Zoning Ordinance, Article 10 Section 3.11
• Outlines designation process for the Historic District
• Sets out design criteria to govern design review
Refer to the following Architectural review standards.
guidelines: An architectural review certificate may be issued if it is found that the
architectural style, general design, height, bulk and setbacks,
Secretary of the Interior’s arrangement, location and materials and structures affecting the exterior
Standards for appearance are generally in harmony with neighboring structures and
Rehabilitation complementary to the traditional architectural standards of the historic
district as set forth in the historic district design guidelines and standards
Design Standards adopted by the planning commission and as set forth in the United States
Secretary of the Interior's Standards for Rehabilitation. Zoning Ordinance,
and Guidelines for Article 10 Section 3.25(A)
the City of Dover
Historic District Historic district design guidelines and standards: The document
Zone adopted by the City of Dover Planning Commission as being the source
reference document for construction and maintenance of buildings,
structures and additions within the Dover Historic District and which is the
guiding document for the historic district commission and city planner in
their review of applications for architectural review certification. Zoning
Ordinance, Article 12 Definitions
Architectural
Review Certificate • Process of Architectural Review Certification
shall be required for the Architectural review certificate: A signed and dated document
demolition, construction, indicating the approval of the City of Dover Planning Commission, or the
reconstruction, alteration historic district commission, or city planner upon the authority of the
or restoration of any new historic district commission, for alteration, construction, relocation, or
or existing structure or demolition within the historic district. Zoning Ordinance, Article 12 Definitions.
where general exterior
repairs are made with in An Architectural Review Certificate may be issued in one of three ways:
the Historic District. It is • As part of the Building Permit process following administrative
not required for normal review of project activities by Staff.
maintenance and repair, • By the Historic District Commission following review of an
interior arrangement, or application submission.
building features not • By the Planning Commission following consideration and
subject to public view. recommendations by the Historic District Commission’s review
of an application submission.
60
Page 61
Item 7.
The City of Dover was designated a Certified Local Government in 2015.
For Information on Historic Preservation Activities and the City of Dover Historic District
Commission, please contact Planning Staff in the Department of Planning & Inspections.
City of Dover, Delaware
Historic District Commission
Department of Planning & Inspections
Department of Planning Inspections
15 Loockerman Plaza
P.O. Box 475
Dover DE 19903
Phone: 302-736-7196 or
302-736-7010
Fax: 302-736-4217
www.cityofdover.com
Associated Topics to Learn More About:
• Architectural Review Certification process • Tax Credit Program for Historic Properties
I n f o r m a t i o n F r o m :
• National Park Service website: www.nps.gov/subjects/historicpreservation
• “Design Review in Historic Districts” by Rachel S. Cox, a publication by the National Trust
for Historic Preservation
• City of Dover Code of Ordinances, Appendix B: Zoning Ordinance
• Design Standards and Guidelines for the City of Dover Historic District Zone
Information Newsletter created 2006, Updated June 2019
61