Attachment Attachment #1 #1 Utility Utility Committee Committee 04/25/2005 04/25/2005 Water System Master Plan City of Dover Utility Committee Presentation April 25, 2005 Slide 1

Page 2

Water System Master Plan • System Mapping and Demands • Update of Hydraulic Model • Distribution System Summary • Preliminary Capital Improvement Program – Water Supply, Storage and Distribution Slide 2

Page 3

Water System Mapping Complete Water System Update by City Map Book Development Slide 3

Page 4

Water System Demands Hydraulic Billing GIS Modeling Data Software • GIS software acts as a bridge to link textually based data to spatially based software. Slide 4

Page 5

Water System Demand Distribution BEFORE AFTER Slide 5

Page 6

Water System Demand Projections • Planned/Projected Growth • Annexation • Service Area Expansion • Bulk Customers • Flat Industrial Growth Slide 6

Page 7

Water System Demand Projections • 2005 Average Day Demand: 5.7 MGD • 2025 Average Day Demand: 8.1 MGD • Maximum Day Factor: 1.7 City of Dover Water Master Plan • 2025 Maximum Day Demand: Projected Annual Average Day Demands 13.7 MGD 10.0 Avg. Day Demand w/Devel 9.0 8.1 MGD 8.0 Water Use (MG) 7.0 6.0 5.0 4.0 2005 2010 2015 2020 2025 Fiscal Year Slide 7

Page 8

Update of Hydraulic Model • Software – H2ONet (City-Owned, GIS-Compatible) • Model – Re-create model – Assign demand to pipe nodes via City billing record – County tax map link • Calibration – Flow and pressure testing – Compare system performance vs. model Slide 8

Page 9

Distribution System Summary Pipe Size – Water Model Slide 9

Page 10

Distribution System Summary Pipe Size Pipe Diameter Pipe Length (miles) Percent 4" 11.34 6.44% 6" 42.29 24.01% 8" 59.09 33.55% 10" 24.81 14.08% 12" 32.41 18.40% 14" 2.45 1.39% 16" 3.67 2.08% 20" 0.07 0.04% Total 176.13 100.00% 16" 20" 14" 4" 12" 6" 10" 8" Slide 10

Page 11

Distribution System Summary Pipe Material Pipe Material Pipe Length (miles) Percent ACP 2.81 1.59% CIP 92.97 52.78% DIP 70.71 40.15% HDPE 0.13 0.07% PVC 9.52 5.40% Total 176.13 100.00% PVC HDPE ACP DIP CIP Slide 11

Page 12

Distribution System Summary Pipe Material – Cast Iron Pipe Slide 12

Page 13

Preliminary CIP - Water Supply • Maximum Day Demand • Permitted Daily Capacities: City of Dover Water Master Plan Projected Maximum Day Demands 16.0 - Deep Well: 11.96 MGD 15.0 - WTP: 4.68 MGD 14.0 13.7 MGD 13.0 • Actual Production 12.0 Water Use (MG) 1 MGD Capacity: 13.15 MGD 11.0 10.0 Safe Production Capacity • Total Safe Production 9.0 8.0 Max. Day Demand w/Devel. Capacity: 10.64 MGD 7.0 6.0 2005 2010 2015 2020 2025 Fiscal Year Slide 13

Page 14

Preliminary CIP - Water Storage Storage Required Capacity / Storage 5.00 Needs: 4.50 Equalization: Equalization: 4.00 Million Gallons -- 0.15 0.15 ** max max day day Current Storage 3.50 Fire Fire Flow: Flow: -- 5,000 5,000 gpm gpm for for 44 hours hours 3.00 Emergency: Emergency: 2.50 Storage Required -- 0.10 0.10 ** max max day day 2.00 2005 2010 2015 2020 2025 Year Water Storage Requirement (Million Gallons) Equaliz: Avg. Day Max. Day 15% of Fire Flow: Emerg: Demand Demand Max. 5,000 gpm 10% of Storage Year w/Devel w/Devel. Day for 4 Hours Max. Day Required 2005 5.65 9.61 1.44 1.2 0.96 3.60 2010 6.65 11.31 1.70 1.2 1.13 4.03 2015 7.22 12.27 1.84 1.2 1.23 4.27 2020 7.84 13.32 2.00 1.2 1.33 4.53 2025 8.07 13.72 2.06 1.2 1.37 4.63 Slide 14

Page 15

Preliminary CIP - Distribution Slide 15

Page 16

Preliminary Capital Improvement Program Distribution $19.7 M Supply/Treatm ent $2.8 M Storage $4.0 M Total $26.2 M $0.0 M $5.0 M $10.0 M $15.0 M $20.0 M $25.0 M $30.0 M Cost ( in million dollars) Slide 16