1-507. METER SOCKET REQUIREMENTS: All meter sockets shall be constructed from steel, aluminum
sockets will be acceptable. All acceptable meter sockets must be UL (Underwriters Laboratory) approved.
All meter sockets shall accept blade type meters, bolted type meter sockets will not be acceptable.
1-513. The City will install and maintain the service conductors to the first mechanical connection on the
customers dwelling at the service point side. The customer will supply/install the meter socket, conduit (if
underground, the conduit shall extend from the meter socket to a point one (1) foot into the earth), and/or
any necessary equipment for service.
In cases of group metering, the contractor will supply multiple meter socket devices in any combination;
however, the height of the lowest kilowatt meter centerline shall be no less than 34" and the highest kilowatt
meter centerline shall be no higher than 72" above final grade. The multi-meter mounting devices shall be
of a type approved by the City. The contractor shall install the meter mounting devices and underground
conduit. Each meter socket in a multi-meter installation must have clearly visible, distinct, permanent
inside and outside identification, as to the location of which service is supplied. If access to the base of
the metering unit is restricted because of concrete or other covering material the conduit shall be extended
to a point outside the covering material at no expense to the City.
1-514. CHANGE OF SERVICE: The meter socket will be placed at an accessible outside location, if
feasible, at a point agreeable to both parties. If underground, the City will install direct bury service
conductors. The City may at its option leave the metering installation on the backyard and install a remote
metering device on an accessible outside wall. The meter wire for the remote device will be installed by
the City and attached to the surface of the home.
1-521. DEFINED: Greater than 400 amp Wye - Greater than 200 amp Delta - CT Metering. The meter
will be located on or near the customer's property line (metering point agreeable by both parties). The
customer will be responsible for all service conductors and associated equipment from the metering point.
The City will be responsible and supply all metering equipment: PT's, CT's, Meter Socket(s), Meter(s), CT
cabinet, and conduits if required at the metering point. On an underground service(s), the customer service
will begin at the load side (secondary side) of the transformer or secondary pedestal and the customer will
make this connection. If the metering installation is mounted on the building the customer will be
responsible for mounting of the meter socket(s), CT cabinet, and installation of meter conductor conduit.
The service point will continue to be at the transformer, pedestal, or pole. If the metering installation is not
building mounted, the City will install the meter socket and associated equipment. On overhead services
Page 2
the point of attachment will be a pole located at/near the property line and the City will install all the
metering equipment at this point. If the customer requires Demand Side Management information the
customer shall install and maintain a dedicated telephone line to the metering point.
1-522. DEFINED: A primary customer is one who owns and maintains all primary cables, wires,
transformer(s), secondary cables, and all associated equipment past the metering point. The City will
provide and install all metering equipment. Overhead: The metering installation will be located at or near
the property line (metering point). Underground: The metering installation will be located on a riser pole,
or underground metering cabinet, at or near the customer's property line (metering point). The customer
will be responsible for the installation and maintenance of all equipment from the metering point. On pole
mounted metering installations, the point of attachment is defined as the load side of CT and the City will
make this connection. On underground, the point of attachment will be the elbow inserts and the customer
will terminate the customer owned cables at the metering point. On an underground service, the customer
will provide an approved pad on which the metering enclosure will rest. If the customer requires Demand
Side Management information, the customer shall install and maintain a dedicated telephone line to the
metering point.
DIVISION IV
Summer Billing Months Winter Billing Months
MONTHLY RATES June through October November through May
Energy Charge per kWh .04589 .04589
Demand Charge per kW 8.50 5.80
Monthly Transformer lease rate:
300 KVA 350.00 350.00
500 KVA 400.00 400.00
750 KVA 550.00 550.00
1000 KVA 600.00 600.00
1500 KVA 900.00 900.00
Page 3
ATTACHMENT #2
UTILITY COMMITTEE MINUTES 10/11/2004
DOWNTOWN REVITALIZATION PROJECT
LOCATION SEGMENT DESCRIPTION ESTIMATE ACTUAL FUNDING SOURCES
CECIL STREET From N. Governors Avenue to N. West Street $100,000.00 $125,456.95 COD General Fund - $125,456.95
FULTON STREET From N. Governors Avenue to N. West Street $125,500.00 $113,368.68 COD General Fund - $68,771.28
CDBG Funds - $44,597.40
N. QUEEN STREET From Division Street to Mary Street $117,000.00 $130,275.82 COD General Fund - $16,073.22
CDBG Funds - $93,402.60
Weed & Seed Funds - $20,800.00
N. NEW STREET From Division Street to Mary Street $105,000.00 $152,736.04 COD General Fund - $152,736.04
$447,500.00 $521,837.49
2003 IMPROVEMENT AREA SUMMARY
$600,000.00
16.61% INCREASE
$500,000.00 ESTIMATE
ACTUAL EACTUAL
CECIL STREET
$400,000.00 FULTON STREET
N. QUEEN STREET
$300,000.00 N. NEW STREET
TOTAL
$200,000.00
$100,000.00
$0.00
CECIL STREET FULTON STREET N. QUEEN STREET N. NEW STREET TOTAL
2003 IMPROVEMENT AREA SUMMARY
Page 4
DOWNTOWN REVITALIZATION PROJECT
LOCATION SEGMENT DESCRIPTION ESTIMATE ACTUAL FUNDING SOURCES
MARY STREET From N. Governors Avenue to N. West Street $121,681.50 COD General Fund - $121,681.50
N. WEST STREET From Division Street to Mary Street $121,285.00 COD General Fund - $121,285.00
N. KIRKWOOD STREET From Division Street to Mary Street $124,914.00 CDBG Funds - $124,914.00
S. NEW STREET From Division Street to Loockerman Street $207,541.00 CDBG Funds - $6,829.00
$575,421.50 $0.00
2004 IMPROVEMENT AREA SUMMARY
$700,000.00
$600,000.00 ESTIMATE
ACTUAL
$500,000.00
$400,000.00
EACTUAL
$300,000.00 MARY STREET
N. WEST STREET
$200,000.00 N. KIRKWOOD STREET
S. NEW STREET
$100,000.00 TOTAL
$0.00
MARY STREET N. WEST STREET N. KIRKWOOD STREET S. NEW STREET TOTAL
2004 IMPROVEMENT AREA SUMMARY