Skip to main content
AskDover

Historic District Commission Paperless Packet

Historic District Commission. Oct 17, 2024.

Open the PDF

This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.

37 pages have little or no readable text here, often scans or drawings. See the PDF for those.

Page 1

CITY OF DOVER, DELAWARE HISTORIC DISTRICT COMMISSION MEETING Thursday, October 17, 2024 at 3:30 PM City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware AGENDA IN-PERSON and VIRTUAL MEETING NOTICE The Historic District Commission Meeting for October 17, 2024, will be held in City Hall Council Chambers. The public is welcome to attend in person. The Meeting will also be provided as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic means of communication. See the participation information below to join by phone or computer. PUBLIC PARTICIPATION INFORMATION City of Dover Historic District Commission Meeting of October 17, 2024 Join by Phone: 1-650-479-3208 Access Code: 253 120 55814 Password from Phones: 36837432 Join Online: https://bit.ly/HDCMeeting10172024 Webinar Number: 2531 205 5814 Webinar Password: DoverHDC If you are new to Webex get the app now at https://www.webex.com/ to be ready when the meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196. Written comments are accepted via mail to City of Dover – Historic District Commission, P.O. Box 475 Dover De 19903 and via email at CompPlan@dover.de.us WELCOME ROLL CALL APPROVAL OF AGENDA APPROVAL OF MINUTES 1. Adoption of Minutes of September 19, 2024 COMMUNICATIONS & REPORTS 1

Page 2

HISTORIC DISTRICT COMMISSION MEETING - October 17, 2024 PAGE 2 Summary of Activity 2. Summary of Applications 2023 and 2024 3. Summary of Architectural Review Certificates for 2024 Department of Planning & Inspections Updates NEW BUSINESS Review of Permits Referred to Commission 4. HI-24-08 Referral of Permit #24-1339 Demolition, Addition & Renovations at 21 N. American Avenue - Referral by the City Planner to the Historic District Commission for Review of Architectural Review Certification for a Permit Application #24-1399 for the demolition of a rear one-story addition, rebuild of the rear addition as two-story, renovations to the first rear one- a-half story rear addition and its porch, removal of asbestos siding and reclad in vinyl siding, and renovations to front porch. The property is zoned RG-1 (General Residence Zone) and partially subject to the H (Historic District Zone). The property is located east of N. American Avenue north of East Division Street. The owner of record is Robin Achenbach. The property address is 21 N. American Avenue (previously 19 and 21 N. American Avenue). Tax Parcel: ED-05- 077.05-02-23.00-000. Minor Lot Line Adjustment Plan MI-24-04 combined the two existing parcels into one parcel. This Permit proposes to convert building from duplex units into one single-family detached dwelling. NEW APPLICATIONS 5. HI-24-07 Legislative Hall Building Addition at 411 Legislative Avenue – Public Hearing and Review for Recommendation on Architectural Review Certification for a Site Development Plan Application for renovation and expansion of Legislative Hall. The proposal includes a three- story Building Addition on the east side of the existing Legislative Hall building creating a new main public entrance, a Plaza area with Monument Walk, and other site improvements. The main property of 2.80 acres+/- is zoned IO (Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone) and the H (Historic District Zone). The other property of 0.43 acres+/- is zoned ROS (Recreational and Open Space Zone) and subject to H (Historic District Zone). The subject properties are located on the east side of Legislative Avenue as the block between Martin Luther King Jr. Boulevard North and Martin Luther King Jr. South. The owner of record is the State of Delaware. Property Addresses: 411 Legislative Avenue and Court Street. Tax Parcels: ED-05-077.09-05-15.00-000 and ED-05-077.09-05-14.00-000. Council District 4. OLD BUSINESS Certified Local Government (CLG) Program Implementation of 2019 Comprehensive Plan ADJOURN Posted: October 10, 2024 THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING 2

Page 3

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION SEPTEMBER 19, 2024 The Meeting of the City of Dover Historic District Commission was held on Thursday, September 19, 2024, at 3:30 PM as an In-Person meeting in the City Hall Council Chambers (anchor location) and virtually using the videoconferencing system Webex. With Chairman Czerwinski presiding, the other members present were Ms. Horsey, Mrs. Richardson, and Mrs. Mason. Planning Office Staff members present were Mrs. Melson-Williams, Ms. Katherine Oehmke, and Mrs. Savage-Purnell. APPROVAL OF AGENDA Ms. Horsey moved for approval of the agenda as presented, seconded by Mrs. Richardson, and the vote was unanimously carried 4-0. ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION MEETING OF JUNE 20, 2024 Mrs. Richardson moved for approval of the Meeting Minutes of June 20, 2024, seconded by Ms. Mason, and approved 4-0. COMMUNICATIONS & REPORTS Summary of Applications for 2023 and 2024 Mrs. Melson-Williams mentioned that the Commission reviewed a total of 5 applications in 2023. All of them are either complete or underway. With the Permit Referral that was reviewed for 153 S. Bradford Street, they were initialing looking to demolish the second floor of that building. However, after meeting with you, they re-evaluated their options and brought forth a Permit to complete renovations and repairs of the masonry instead; thus, keeping the full building intact. The renovation work is underway. For 2024, as of today the Commission is reviewing their sixth application (HI-24-06). There are notably two requests for Demolition and then another request for Demolition of buildings in the Historic District. For the Demolition of the building at 120 South Governor's Avenue (the old Acme grocery store) that permit was issued and from conversations today, it appears that demolition activity is well underway at that location. The other one of note, is a project for the Legislative Hall Parking Garage (HI-24-04) at 425 East Avenue that is beside the Del-One Federal Credit Union Building. The Historic District Commission reviewed that earlier this summer and provided a Recommendation on its Architectural Review Certification. That project and its Site Plan was at the City's Planning Commission earlier this week and the Planning Commission granted Conditional approval to the Site Plan along with final approval on the Architectural Review Certification for that project. They did not require any additional changes. They received a full report including your meeting minutes on your deliberations on that project specifically. I think the one concerns you had was related to the screening of the portion of the project where there would be a generator in the future. For the screening of that wall and nearby fencing, they have made those updates to their Plan. They'll move through a review process to finalize that Plan before construction could commence there. 3

Page 4

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION SEPTEMBER 19, 2024 Mrs. Melson-Williams asked if there were any questions; there were none. Summary of Architectural Review Certifications for 2024 Mrs. Melson-Williams stated that these are actions involving Permits that are basically in the Historic District. For the most part, that Permit activity has been eligible for a Staff review process. Or in some cases, if it was interior renovations, there is no requirement for Architectural Review Certification for interior work. In total through the end of August, there have been 23 Applications for Permits in the Historic District. The Historic District Commission was involved in some aspects of only two of those. We've seen a lot of Sign Permits in the Historic District most recently and that leads the way. There have been a number of Roof Permits which typically are not visible, a couple of Fence Permits as well as some building exterior improvements related to some kind of access situations for ramping systems and entry doors. Mrs. Melson-Williams asked if there were any questions. Chairman Czerwinski asked about the last entry Permit #24-1150 Sign Permit for 32 W. Loockerman Street that we reviewed. He recalled that was one on the building where we had stated that they could install their sign along the metal portion of the horizontal structure member of the building. Here it's showing that the Staff approval was given which revised (the sign) to a vertical format rather than horizontal. He asked if this could be explained. Mrs. Melson-Williams replied with that the building we were looking at originally had a couple of different sign opportunities there. There was some window signage related to the barbershop and beauty salon. What came before the Commission originally was a rather large sign that was to be kind of high up on the glass wall. This is the building at 32 West Loockerman Street where they wanted to identify Fears Promotions. His offices were part of that building. In kind of reworking some of their signage plans, Fears Promotions turned into a much smaller sign that instead of going across the metal area was to be placed in a vertical orientation more at the pedestrian level. The size we felt was reasonable enough that we did not need to bring it back to you. There is also a boxing business that will be making use of a window sign opportunity at that same location; that's a related business. I think in the long run we ended up with a much smaller sign at that location for one of the ones that was brought before you. Chairman Czerwinski asked if the sign runs along the corner of the building? Mrs. Melson- Williams replied, it does run along a corner of the building. It does not cross window space. It is a little bit wider metal already existing. Chairman Czerwinski asked if there were any questions. There were none. Department of Planning & Inspections Updates Mrs. Melson-Williams noted that our office continues to be very busy with a variety of our Boards and Commissions meeting and just overall activity wise here in the City of Dover. I do have to share with you that this is the last meeting that you'll see Katherine at, as Katherine will be leaving the City of Dover next week. So, we will be down another Planner. We are actively working to fill our vacancies. However, there are a number throughout our Department as there are citywide. Certainly, if anyone has an indication or someone who may be interested in a City position, 2 4

Page 5

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION SEPTEMBER 19, 2024 certainly visit the City's website at www.cityofdover.com to see the openings across all departments. SPECIAL RECOGNITION Mrs. Melson-Williams mentioned as you know Mr. Jonathan Street was a member of the Historic District Commission. Due to changes in employment and where he currently resides, he had to step down from the Historic District Commission. As is tradition when a member of a Commission steps down for whatever reason, we do prepare a Resolution honoring their time of service with the Commission. At your indulgence, I will let you know that Mr. Street has joined us virtually today from somewhere in North Carolina. I'll read the Resolution into the record. (See attached Resolution) Ms. Horsey moved to approve the Resolution honoring services of Jonathan N.H Street to the Historic District Commission, seconded by Mrs. Richardson, and unanimously carried 4-0 of the members present. Mr. Jonathan Street said good afternoon, everybody! I hope you're all doing well. I don't think I ever want to hear my name repeated that much in one paragraph ever again, but I hope you guys can hear me. Thank you very much. I didn't anticipate or expect this. I served to help the City, not necessarily for any recognition, but it was an absolute pleasure and hope you guys continue the mission. Mrs. Melson-Williams, thank you Jonathan. I don't know if any of the Commission members would like to say anything at this point. Chairman Czerwinski stated thanks a lot for your help with the Board. It's been a real honor serving with you and I wish you the best of luck in everything you do in your future. I will always be thinking of you. Ms. Horsey, thank you. You brought in an element that maybe the rest of us do not have, and that's your engineering background. So, thank you. We miss you already. Mr. Street replied, I’m sure. Ms. Mason noted Jonathan, I'm sorry I've missed you in the last few months, but I really enjoyed all your wisdom and knowledge while you were here. So, good luck with you. Mr. Street replied, thank you Mary, I'm glad to see you're back. I'm glad you're on the mend. Ms. Mason said thank you, I am glad to be back. Mrs. Richardson continued; I just want to thank you. I've always been very impressed with your knowledge and your addition to any conversation we were having. Although I haven't been on the Board very long, I’m just glad that I got to know you as a member. Mr. Street answered well, thank you all very much. It's a little overwhelming. I didn't expect it. 3 5

Page 6

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION SEPTEMBER 19, 2024 Mrs. Melson-Williams concluded with thank you Jonathan for joining us. I'm sure you may have other tasks, but you are certainly welcome to continue listening in this afternoon as they continue their deliberations. NEW APPLICATIONS HI-24-06 Delaware Supreme Court Building Addition and Renovation at 55 The Green - Public Hearing and Review for Action on the Architectural Review Certification associated with the construction of a one-story addition and renovation to the Delaware Supreme Court Building with site improvements. The property is zoned IO (Institutional and Office Zone) and subject to the H (Historic District Zone) and the SWPOZ (Source Water Protection Overlay Zone). The property is located on the east side of The Green and to the east of South State Street. The owner of record is the State of Delaware. Address: 55 The Green. Tax Parcel: ED-05-077.09-05-32.00-000. Council District 4. The project is also subject to review of Administrative Site Plan S-24-15. Ms. Katherine Oehmke gave a brief overview of the project. This is the Delaware Supreme Court Building addition. This property is owned by the State of Delaware, and it's located in the southeast corner of The Green. It is 3.92 acres and on that same parcel there are a few other buildings: one being the Old State House and then the Margaret M. O’Neill Building. The addition is 700 square feet, and it will be on the south side of the building. The property is zoned IO and subject to the Source Water Protection Overlay Zone inside the Historic District. It is also part of the National Register of Historic Places in the Dover Green Historic District. I perused the Public Archives website and found some interesting pictures; so, I thought I'd show these along with the maps. This is a picture of what the building looked like in 1966. This is the 1979 description from the National Register of Historic Places Application. It describes the many different renovations that have happened to the building over the years. I thought it was kind of funny how it mentions that the squaring off of the windows makes it look like a Severe Georgian style. We can see this location has changed a bit over the years. You can see on the right map in 1910, the buildings were connected to the Old State House. In 1919, the buildings were enlarged. You can see the building in 1926 was still connected. This is what it looks like in 2019, and you can see that the porch was removed and rounded off. Here is the Site Plan for this project Application, the renderings, and the pictures. For the proposed edition, this is the drawing that they have provided showing the side and front elevation. You can see that the windows are almost look exactly like the same windows that were on the building before. Ms. Oehmke asked if the Commission members had any questions or comments. There was none. Representative: Ms. Neeka Grove, RG Architects Presentation I am Neeka Grove from RG Architects. We were hired by the State to bring this chambers addition and the interior spaces of two accessible ADA restrooms, break area, work room, and changing area before you. The need was to expand and give them additional office space. For the exterior, we did look at making it a little slightly different than what we see for the 1968 arch 4 6

Page 7

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION SEPTEMBER 19, 2024 top windows. Just because it’s another addition we want to describe it and make sure it's notable in some way. We looked at it and it was looking too similar to the original 1902 structure. I immediately went back to the 1968 structure as what was given as a precedent of then replicating too closely with new materials obviously. Two of the comments that were made were the window type and materials of the windows. The windows are all wood on The Green including this building as well. With working from the State, you've seen that they would prefer a wood with the clad exterior. So, that's what we are proposing. The keystones are also mentioned and are a cast stone material. The brick will be matching the existing brick. There will be a slight difference in the watertable that is currently marble on the structure now. We're proposing a molded brick watertable that would give a little bit of a difference. Then the existing windowsills look like they are marble, and they will be a pitched brick. I don't know if you can tell on our renderings, we are maintaining a piece of the existing 1968 addition where there's a little shadow line. You can see where that sort of projects a few inches and then you have the four arch windows. We don't cover up entirely that whole piece that has a foot and a half that’s exposed. We were still giving that story that you can see. So, it's telling the story. We can see the building evolving and its dates, and that 1968 piece is still there, and the extension comes out just a few feet from it. Ms. Grove asked if anyone had any questions. Mrs. Robinson asked why didn't you continue the marble watermark (watertable) to tie in with the existing building? Responding, Ms. Grove stated that we certainly can, and it was considered. I sit on a Historic District Commission myself and I know by working with National Parks’ Standards, we want to make things just slightly different so we're not completely replicating it. Then it becomes an issue when you're looking at the structure and you're trying to figure out how it's evolved. You know, it's years and gives its story. That's one of the reasons why we did a pitched sill and a molded brick watertable just to give it a little bit of a difference between what's there from the 1902 and what's done in 1968. You can then look at it and say, oh, this is different. It's a matter of trying to blend it but making it slightly different. Is marble what they want? That was just our reason to just to give it some minor definition of how it’s structured. Does that make sense? Ms. Grove asked if there were any other questions. Ms. Horsey commented that being closely involved with this building for the last several decades, I know it inside and out and its history. I think this most recent addition is just right because it is distinctive in how you have laid it out. I do like that you picked up the curved elements of the windows. That brings a distinction of its own. It does have history with the building. This site has looked very different since 1912 when the State House was, you know, “Georgianized”, so to speak, and the two mansions were torn down. I have no problem. The space is definitely native. It's chronic and overly crowded in that building, so I think the design works well. Ms. Grove said thank you, appreciate that. 5 7

Page 8

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION SEPTEMBER 19, 2024 Chairman Czerwinski agreed that he liked the respect towards the addition and keeping the same window shape and everything in the original. My question is this, this building is on the National Register of Historic Places, right? Did the State's Historic Preservation Office sign off on this addition yet? Ms. Grove replied no, is that a requirement? Chairman Czerwinski replied you might want to check with them. It's a government building and having a State building you might have to go through the State Historic Preservation Office to get their approval with it being on the National Register of Historical Places. We can approve it, but make sure you check with them. Ms. Grove replied okay. Chairman Czerwinski asked if there any other questions. Chairman Czerwinski asked if there was anyone from the public that wishes to make a statement on this application. The public hearing is open. Mrs. Melson-Williams (the host) mentioned that the Chair is now opening the public hearing for those in the room. If you wish to speak, if you raise your hand and we'll ask that you move forward to the podium. If there's anyone here that wishes to speak. Mrs. Melson-Williams mentioned that she believed she had several individuals online (participating virtually on Webex). I believe several of them are related to the project, as part of, of the ownership team, but I will see if any of them wish to speak. Mr. Gavin Malone replied no, I am the site supervisor here at the Old State House. I was just actually joining the meeting simply to find out more details about the planned construction. So, I don't have any comments at this time. Mrs. Melson-Williams thanked Mr. Malone for joining us to learn more about the project today. I do see a Joanne Hastings and she had previously noted that she was listening in. I believe she is associated with the Court system. And then I do see a login by Carlos Johnson, if you wish to speak regarding this application. I see that you're unmuted, but I'm not sure if you actually have a microphone that's working at the present time. If they wish to make a comment, they can type into the chat. They mentioned in the chat that they're sorry their mic isn't working, but they have no questions. Thank you for your time and support of this project. Mrs. Melson-Williams mentioned that is the three individuals that have joined us online this afternoon; thank you for that. If you have additional questions, you can certainly reach out to the Planning Office. We're located here in the City Hall building or you can use our contact information that is part of the meeting agenda as posted on the City's website. 6 8

Page 9

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION SEPTEMBER 19, 2024 Chairman Czerwinski asked if anyone has anything they want to discuss about this project before we move forward with a motion? The public hearing was closed seeing no one else to speak. Ms. Horsey moved for approval of the Architectural Review Certification Application HI-24-06 for the Delaware Supreme Court Building addition and renovation to include Staff comments. It was seconded by Mrs. Richardson. The vote was unanimously carried 4-0. NEW BUSINESS Review of Permits Referred to Commission Mrs. Melson-Williams mentioned that there are no new Permits that we need to bring to you today. OLD BUSINESS Certified Local Government (CLG) Program Mrs. Melson-Williams mentioned I believe there's still an opportunity that is open to us about that CLG Grant. Staff from the Historic Preservation Office did mention in an email earlier that they hope to be circling back with us regarding the grant opportunity. Staff will assess the capacity to be dealing with that. If you remember correctly, that was a process that we were looking to go out for consultant services to come up with some research and information on dealing with alternative and modern materials in the Historic District. Implementation of 2019 Comprehensive Plan Mrs. Melson-Williams mentioned that she did not have anything specifically for the Historic District Commission, today on that. I will note that in the Downtown, the Department of Water and Wastewater is continuing to plan for a major infrastructure project along the Lockerman Street corridor, as well as associated street improvements. The Downtown Dover Pathway Study was recently presented to Council by the MPO (Metropolitan Planning Organization). That gave some guidance on potential infrastructure improvements while they're digging for utilities that may alter the kind of the street section, if you will, of what is parking, travel lanes, and sidewalks in the block of Lockerman Street between State Street and Governors Avenue and towards the train station intersection. I'll bring you updates as that project moves forward. Mr. Mason moved to adjourn the meeting seeing no other items of business, seconded by Mrs. Richardson, and unanimously carried 4-0 of the members present. Meeting adjourned at 4:09 PM Sincerely, Maretta Savage-Purnell Secretary 7 9

Page 10

City of Dover Historic District Commission Summary of Applications 2023 Item 2. Updated thru October 9, 2024 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-23-01 Lands of Shank 34 The Green Site Plan for Parking Review for Architectural Review Site Plan granted conditional approval by Shack, LLC: Lot Reconfiguration Certification of Site Plan; Public Historic District Commission. Administrative Parking Lot Improvements Hearing and Review by HDC Site Plan review completed: Final Plan Improvements 1/19/2023. Recommended approval of approval issued May 2023. of ArchRevCert for project. Administrative Building Permit #23-1668 issued 11/6/2023 to commence construction. Improvements are associated with future Kent County Family Court Project. Project underway. HI-23-02 Referral of Fence 147 S. New Street Fence Permit Permit #23-781 referred to HDC by City Permit Application received 5/12/2023 and Permit #23-781 at Planner for consultation on Referred to the HDC for consultation. 147 S. New Street Architectural Review Certification; Permit to be approved for issuance per HDC 5/18/2023 HDC recommended action of 5/18/2023. Permit issued approval of ArchRevCert to allow 6/6/2023. Fence installed. height of 6-feet constructed of wood materials that may be stained (no vinyl fence). HI-23-03 Referral of Permit 43 The Green, John Sign Permit for Permit #23-987 referred to HDC by City Permit Application received and Referred to #23-987 at 43 The Bell House Informational Kiosk Planner for consultation on the HDC for consultation. Project is Green Architectural Review Certification; installation of information kiosk of 9 SF as 7/20/2023 HDC recommended post and panel style sign to display approval of ArchRevCert to allow kiosk information on the First State Heritage Park style sign subject to use of certain activities. Permit approved for issuance per materials. HDC action of 7/20/2023 requiring the use of black metal material or painted wood for kiosk. Sign installed. HI-23-04 Referral of Sign 32 W. Loockerman Sign Permit for 2 Permit #23-1462 referred to HDC by Permit Application received and Referred to Permit #23-1462 Street Business Tenants City Planner for consultation on the HDC for Consultation. Project is at 32 W. Architectural Review Certification; installation of signage for two tenants. HDC Loockerman St 10/19/2023 HDC recommended recommended Revised Signage. Permit approval of ArchRevCert for window approved for part of window sign portion of signs and signs on metal band. project; sign installed. 10

Page 11

City of Dover Historic District Commission Summary of Applications 2023 Item 2. Updated thru October 9, 2024 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-23-05 Referral of 153 S. Bradford Demolition Permit Permit #23-1521 referred to HDC by Building condemned by Code Enforcement, Demolition Street for Demolition of City Planner for consultation on Case #23-3847. Permit Application Permit #23-1521 Second Floor Architectural Review Certification; received for Partial Demolition and at 153 S. Bradford deferred from October 19, 2023 HDC Referred to the HDC for Consultation. St Meeting at request of Applicant. Project seeks to demolish the second floor Consideration began at November 16, of the masonry building and construct flat 2023 HDC Meeting; action pending roof system. Supplemental Engineering submission of additional information. Report received 2/5/2024 and forwarded to Code Enforcement Staff. Permit #23- 1521 was withdrawn as new Permit #24- 427 for renovation/repair of masonry filed in April 2024 and approved for issuance. Renovation work complete. 11

Page 12

City of Dover Historic District Commission Summary of Applications 2024 Item 2. Updated thru October 9, 2024 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-24-01 Referral of Fence 146 S. State Street Fence Permit Permit #23-1868 referred to HDC by Permit Application received 12/13/2023 Permit #23-1868 City Planner for consultation on and Referred to the HDC for consultation. at 146 S. State Architectural Review Certification; The Fence is subject to Code Enforcement Street 1/28/2024 HDC deferred action on Case #23-3983 for installation without a ArchRevCert seeking additional Permit. It is a vinyl fence that is six foot in information on its materials, location, height. HDC granted ArchRevCert subject to and another nearby fence. 2/15/2024 conditions: Fence #2 must be wood and 4 HDC granted ArchRevCert subject to feet in height. Fence #1 due to location can conditions. remain at vinyl at 6 feet. Permit issued in April 2024. HI-24-02 Building 148 S. Bradford Review for Public Hearing and Review for Request to demolish existing building Demolition at 148 Street Architectural Architectural Review Certification by (currently used as offices). HDC denied S. Bradford Street Certification for HDC on 5/16/2024. Action to deny ArchRevCert for demolition. Applicant filed Demolition ArchRevCert. an Appeal to the Planning Commission; Appeal considered by Planning Commission on 6/17/2024. Planning Commission granted approval of ArchRevCert to allow Demolition of Building. HI-24-03 Building 150 S. Bradford Review for Public Hearing and Review for Request to demolish existing building Demolition at 150 Street Architectural Architectural Review Certification by (currently used as offices). HDC denied S. Bradford Street Certification for HCD on 5/16/2024. Action to deny ArchRevCert for demolition. Applicant filed Demolition ArchRevCert. an Appeal to the Planning Commission, Appeal considered by Planning Commission on 6/17/2024.Planning Commission granted approval of ArchRevCert to allow Demolition of Building. 12

Page 13

City of Dover Historic District Commission Summary of Applications 2024 Item 2. Updated thru October 9, 2024 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-24-04 Legislative Hall 425 East Avenue, Site Plan Review for Public Hearing and Review for Site Development Plan review for new Parking Garage at corner of East Architectural Review Recommendation on Architectural Parking Garage Structure and associated 425 East Avenue Avenue/ E. Water Certification Review Certification by HDC on site improvements. Recommendation on Street and Martin 5/16/2024. Recommended approval of ArchRevCert will be forwarded to Planning Luther King Jr. ArchRevCert for project. Commission for future consideration during Boulevard South Site Plan review process. Application filed with Board of Adjustment for variances related to floodplain requirements; BOA considered on 6/20/2024 and granted approval of two variances (V-24-01). Site Plan Application (S-24-14) filed and scheduled to be considered by Planning Commission on 9/16/2024. HI-24-05 Building 120 S. Governors Review for Public Hearing and Review for Request to demolish existing commercial Demolition at 120 Avenue Architectural Architectural Review Certification by building (was Acme grocery store then S. Governors Certification for HDC on 6/20/2024. Granted approval recent tenants of auto parts store and a Avenue Demolition of ArchRevCert to allow Demolition of Child Day Care Center). Demolition Permit building. issued and demolition activities underway. HI-24-06 Delaware 55 The Green Site Plan Review for Public Hearing and Review for Action Review of ArchRevCert for one story Supreme Court Architectural Review on Architectural Review Certification Building Addition. Project is subject to an Building Addition Certification by HDC on 9/19/2024. Granted Administrative Site Plan process; and Renovations approval of ArchRevCert to allow Administrative Site Plan filed and currently building addition. under review. 13

Page 14

City of Dover Historic District Commission Summary of Applications 2024 Item 2. Updated thru October 9, 2024 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-24-07 Legislative Hall 411 Legislative Site Plan Review for Public Hearing and Review for Site Development Plan review for Building Building Addition Avenue Architectural Review Recommendation on Architectural Addition and Plaza Area and associated site Certification Review Certification by HDC on improvements. Recommendation on 10/17/2024. Recommended approval ArchRevCert will be forwarded to Planning of ArchRevCert for project. Commission for future consideration during Site Plan review process. Site Plan Application just filed and anticipated to be scheduled to be considered by Planning Commission in November 2024. 14

Page 15

2024 Permit Activity in the Historic District Item 3. Updated thru 9-30-2024 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 1/26/2024 24-67 28 W Loockerman St, The Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations - storage area Hive Renovations required for interior work. wall. 2/21/2024 23-887 29 N State St, Office Sign Permit Staff Approval. No ArchRevCert Installation of monument sign in required for interior work. State building sign format. 2/5/2024 24-84 3 S American Avenue, Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations of office space. Offices Renovations required for interior work. 2/23/2024 24-159 89 Kings Hwy SW, Roof Permit No Planning Staff Review. Roof replacement project. Richardson & Robbins Building 2/26/2024 24-198 401 Federal Street, Building Permit - Exterior Staff Approval Repair and reconstruction of ADA Townsend Building Improvements ramp system on north side of building and parking lot areas improvements. 3/4/2024 21-1660 215 W Loockerman Street, Building Permit - Exterior Staff Approval Renovations to entry door and Mountain Consulting Renovations creation of vestibule entry area with storefront door/window system. 3/19/2024 23-1383 8 The Green Building Permit - Exterior Staff Approval Replacement of wooden egress stair Renovations to side/rear of building. 3/25/2024 23-1868 146 S State Street, Offices Fence Permit HDC Consultation on ArchRevCert Fences built without a permit; Code 1/18/2024 and 2/15/2024; Staff Enforcement Case. Referral of Fence approval per ARC Permit as HI-24-01. HDC approved with conditions: Fence #1 to remain a 6-foot vinyl as limited visibility; Fence #2 to be replaced by 4-foot wood fence. 3/25/2024 23-1874 1 Kings Hwy NE Roof Permit No Planning Staff Review. Replacement of roof on back of house. 3/25/2024 24-147 108 W Loockerman St Roof Permit No Planning Staff Review. Roof replacement project. 4/23/2024 24-455 217 W Loockerman St Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for fire walls Renovations required for interior work. and rear door to storage area. 4/29/2024 24-566 147 S Governors Avenue, Sign Permit Staff Approval Installation of hanging sign for Pastries Deli & More business tenant. 15

Page 16

2024 Permit Activity in the Historic District Item 3. Updated thru 9-30-2024 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 5/8/2024 24-546 151-181 Kings Hwy SW, Administrative Permit Staff Approval. Brick repair and repointing of patio Woodburn areas. 5/23/2024 24-697 501 S State Street, Christ Temporary Sign Permit Staff Approval. Temporary Banner installed June- Church July. 6/26/2024 24-570 231 W Loockerman Street Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for two Renovations required for interior work. apartment units. 6/25/2024 24-709 43 The Green, John Bell Fence Permit Staff Approval. Installation of wood picket fence to House comply with maximum 4-foot height. Original materials revised to comply with DS&G. 6/27/2024 24-897 136 W Loockerman Street, Sign Permit Staff Approval Installation of window sign and Key to Life Juice Bar hanging blade sign for new business tenant 6/28/2024 24-921 29 S State Street, Ward & Sign Permit Staff Approval Installation of wall sign and post Taylor Law Office sign for new office tenant 7/22/2024 24-123 26 S State Street, Building Permit - Renovations Staff Approval Replace rear egress stairs in area at Apartment Building rear of building - not visible from street right-of-way 8/13/2024 23-1492 32 W Loockerman St, Fears Sign Permit Staff Approval per previous Sign Installation of two window signs Barber & Beauty Shop Permit Referral to HDC at HI-23-04 (vinyl applied to window) for Barber and Beauty Shops; other Fears Promotions Signage not included in this permit. 8/1/2024 24-757 223 S State Street Roof Permit Staff Approval Existing flat roof on upper third floor roof to be replaced with EPDM roofing. Location is not visible. 8/6/2024 24-894 89 Kings Hwy SW, Fence Permit Staff Approval Replacement of existing 8 ft. Fence Richardson & Robbins to include privacy slats in rear Building (DNREC) location that is not visible from right- of-way. 16

Page 17

2024 Permit Activity in the Historic District Item 3. Updated thru 9-30-2024 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 8/13/2024 24-1150 32 W Loockerman St, Fears Sign Permit Staff Approval. Signs related to installation of window and wall Promotions previous Sign Permit Referral to HDC signs for Fears Promotions (Boxing). in HI-23-04. Wall signs revised to vertical format rather than horizontal. 9/3/2024 24-908 523 S State Street, Christ Temporary Sign Permit Staff Approval Installation of Banner for period of Episcopal Church 60 days. 9/9/2024 24-1123 21 N State Street, State Sign Permit Staff Approval Installation of replacement signs at Street Assisted Living parking lot entrances, hanging signs on front porch, and monument sign for facility. 9/3/2024 24-1237 120 S Governors Avenue Demolition Permit Staff Approval per HDC issued Demolition of "Old Acme Building" ArchRevCert for HI-24-05 to allow and stabilization of site. Demolition. Redevelopment will be subject to future Site Plan/ArchRevCert review process. 17

Page 18

Item 4. City of Dover ARCHITECTURAL REVIEW REPORT Referral by City Planner to Historic District Commission Meeting of October 17, 2024 Permit: Building Permit #24-1399 Location: 21 N. American Avenue, Dover (Portion of building previously addressed as 19 N. American Avenue) Located at the east side of N. American Avenue, north of E. Division Street Tax Parcel: ED-05-077.05-02-23.00-000 File Number: HI-24-08 Present Zoning: RG-1 (General Residence Zone) H (Historic District Zone) Referral of Permit: The following application Building Permit #24-1399 for 21 N. American Avenue is referred by the City Planner to the Historic District Commission for consultation regarding the issuance of the Architectural Review Certificate for a Building (Demolition, Addition, & Renovation) project. Applications for certain types of construction activity within the Historic District Zone (H) are reviewed by the City Planner (or Staff as designated) for Architectural Review Certification as part of the Building Permit application review process. Staff is referring the Permit for review under the provisions of Zoning Ordinance, Article 10 Section 3.22(A) and (B). See below. Section 3.22 Architectural review certification by the city planner. (A) An architectural review certificate for specific classes of building permits, including fences, signs, siding, window and door replacement, roofing, the addition or replacement of decorative features, minor demolition, residential additions, and other construction of a minor nature, may be issued by the city planner, after a review and determination that the proposed construction is in general accordance with the standards set forth in subsection 3.25. (B) The city planner may refer any permit application for demolition or construction in the historic district for consultation with commission. Permit Proposal: Building Permit #24-1399 was filed on September 25, 2024 for a project consisting of the demolition of a rear one-story addition, rebuild of the rear addition as two-story, renovations to the first rear one-a-half story rear addition and its porch, removal of asbestos siding and reclad in vinyl siding, and renovations to front porch. The Permit Plan set depicts the project locations and activities as follows: P. O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 18

Page 19

Item 4. HI-24-08 Referral of Permit #24-1399 for 21 N. American Avenue Staff Report to the Historic District Commission Page 2 of 4 • The second rear addition of 204 SF will be removed and the new rear addition footprint is 289 SF to consist of new mudroom and bathroom areas on the first floor with a room above. • The first rear addition (one-and-half story) will remain and have its side porch renovated with new foundation, changes to doors and windows, and interior layout revisions. • This half of the existing building (former southern duplex unit) is clad with an asbestos (cement) shingle; this cladding is proposed for removal with the building to be reclad in horizontal vinyl siding. • On the front façade, the original front door (to this side of the duplex) is proposed for removal with the wall opening infilled. The front porch dividing railing is to be removed and to be reused to close off the previous stepped entry to the south unit. With the removal of the steps there will be only one entry point to the full-width front porch. • The interior layout and its reconfiguration is not subject to review for Architectural Review Certification. The portion of the property (the southern half) where the project activities are proposed is located with the local Historic District Zone (H) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. Staff Review of Permit for Architectural Review Certification: Project activities are reviewed for compliance with the Zoning Ordinance and the Design Standards and Guidelines for the City of Dover Historic District Zone as stated in Zoning Ordinance, Article 10 Section 3.25(A). 3.25 Architectural review standards. (A) An architectural review certificate may be issued if it is found that the architectural style, general design, height, bulk and setbacks, arrangement, location and materials and structures affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district as set forth in the historic district design guidelines and standards adopted by the planning commission and as set forth in the United States Secretary of the Interior's Standards for Rehabilitation. In reviewing the proposed project for Architectural Review Certification, Staff referenced various sections of Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of the Design Standards and Guidelines for the City of Dover Historic District Zone which presents the Recommended, Not Recommended, and Inappropriate approaches to construction of various elements in the Historic District. Also referenced is Chapter 4: New Construction, Addition, Demolition and Relocation of the Design Standards and Guidelines. This Request should be reviewed for conformity with the design criteria and development guidelines found in the Design Standards and Guidelines for the City of Dover Historic District Zone. Specifically, Chapter 3 includes the following discussions page 3-3 through 3-8 on Doors and Windows; pages 3-14 through 3-16 on Walls: Wood Siding and Trim; and pages 3-16 through 3-20 on Porches. See Attached copies of these sections. 19 2

Page 20

Item 4. HI-24-08 Referral of Permit #24-1399 for 21 N. American Avenue Staff Report to the Historic District Commission Page 3 of 4 The proposal for demolition of the rear building addition must be reviewed for conformity with the design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation (pages 4-10 to 4-12). The Design Standards and Guidelines give guidance to the Historic District Commission by listing specific criteria to be evaluated when considering applications for the demolition of buildings in the historic district. These guidelines focus on consideration of financial implications, building significance, plans for new construction, recordation of the building, and the site following demolition (see Design Standards and Guidelines for the complete text). Chapter 4 (pages 4-8 through 4-10) focuses on Additions to Existing Buildings with consideration given to Siting, Scale, Elevation of the First Floor, Floor-to-Floor Heights, Massing, Orientation, Proportions, Materials, Forms, and other elements. Historic District Commission Action The Historic District Commission should consider the proposal for the Demolition, Addition & Renovation project and take action in regard to the Architectural Review Certification for the Building Permit #24-1399. The Historic District Commission may add conditions for the project in order to comply with the character of the property within the Historic District. Staff Findings from Review of Building Permit: Staff findings and recommendations are summarized as follows for the proposed building project as presented in Permit #24-1399 and accompanying plan set. 1. The rear building addition proposed for demolition is towards the rear of the property and is small in overall size. It is somewhat limited in its visibility from the street. 2. The overall structure appears to have been constructed as duplex (two side-by-side dwelling units) with later rear additions to the main two-story structure. From the street view, the building retains the form characteristics of the two units, but the exterior finishes and rear additions have been changed over time. The northern half (unit) is clad in vinyl siding and has a large two-story rear addition. The southern half is clad with a cement shingle siding and may retain some of the wood trim detailing at the eave. The main block has a metal roof across the full width of the structure. The front porch exists across the full width of the front façade and is divided for the two units. 3. The property now exists as one parcel following a Minor Lot Line Adjustment Plan (MI- 24-04) to consolidate the previous two parcels as the property is under a single owner who wishes to convert the two duplex units into one single-family dwelling unit. Suggested Items for Consideration regarding Architectural Review Certification: Staff notes the following items that could be considered to allow a better fit of the proposed project within the Historic District guidelines. 1. Second Rear Addition Demolition: Staff recommends approval to allow for demolition of the second rear addition due to its location and size and condition. This is a minor demolition. 20 3

Page 21

Item 4. HI-24-08 Referral of Permit #24-1399 for 21 N. American Avenue Staff Report to the Historic District Commission Page 4 of 4 2. Second Rear Addition Rebuild: Staff recommends approval to allow for the rebuilding of the second rear addition as proposed as it is distinguishable as an addition and is limited in size. The use of horizontal siding is recommended and given the location of this rear addition the use of vinyl siding could be utilized. 3. Rear Addition Renovations: Staff recommends approval of the renovation of the rear addition to reconstruct its porch and to relocate the entry door to the new rear addition. It is recommended that the second-floor windows be replaced in the same configuration as the existing rather than the with narrow band windows. With the removal of the asbestos shingles on this addition, consideration should be given to repair or replace in-kind (wood or composite) horizontal siding as the surface area is minimal on the south elevation. 4. Exterior Finishes: Staff notes that the removal of the asbestos/cement shingle siding is likely to reveal a horizontal wood siding and trimwork on the main block of the structure. It is recommended that exterior finish for the main block be horizontal siding with the repair or replacement in-kind (wood or composite siding) and include the retaining the form of any window trimwork, corner boards, cornice details, etc. 5. Front Façade and Porch: For the front porch area, Staff recommends that the front door remain in place for the southern unit as it continues the historic appearance of this structure as a duplex. Staff also recommends that the second opening (in the porch balustrade) and steps to the porch remain in place for the same reasons. The dividing railing/balustrade can be removed to create the large (undivided) front porch area. Advisory Comments and Recommendations: 1. The applicant shall be aware that issuance of a Building Permit is required prior to the commencement of construction. The Building Permit Application will be subject to the conditions of approval established and may be required to be updated, if necessary, to comply with these conditions established through the Architectural Review Certification process. 2. In the event, that major changes and revisions to the project proposal occur, contact the Department of Planning and Inspections. These changes may require resubmittal for review by the Historic District Commission. Attachments: • Letter of Referral Notice to Applicant dated October 10, 2024 • Building Permit #24-1399 Application Form and Permit submission documents • Streetview image • Design Standards and Guidelines for the City of Dover Historic District Zone, excerpts from Chapter 3 and Chapter 4 21 4

Page 22

Item 4. City of Dover October 10, 2024 Mark & Robin Achenbach Bill Byler Jr. 21 N. American Avenue Wm Byler Jr. Architect, Inc. Dover DE 19901 PO Box 104 Via Email: robinpachenbach@gmail.com Kenton DE 19955 Via Email: bill@wbjarchitect.com Re: Referral of Building Permit #24-1399 to Historic District Commission, HI-24-08 Project for Rear Addition Demolition, Rear Addition Rebuild and Renovations (Siding and Front Porch), Dover, DE Tax Parcel: ED-05-077.05-02-23.00-000 To the Achenbachs and Mr. Bill Byler Jr., This letter is to inform you that Building Permit Application # 24-1399 has been referred to the City of Dover Historic District Commission for consultation. Building Permit #24-1399 was filed on September 25, 2024 for a project at 21 N. American Avenue in Dover, Delaware. As part of the Building Permit review process, it is reviewed by Planning Staff (it was forwarded to our office on October 4, 2024. The project outlined in the Permit submission involves the demolition of a rear one-story addition, rebuild of the rear addition as two-story, renovations to the first rear one-a-half story rear addition and its porch, removal of asbestos siding and reclad in vinyl siding, and renovations to front porch. The property is zoned RG-1 (General Residence Zone) and partially subject to the H (Historic District Zone). The property address is 21 N. American Avenue (previously 19 and 21 N. American Avenue). Minor Lot Line Adjustment Plan MI-24-04 combined the two existing parcels into one parcel. This Permit #24-1399 proposes to convert building from duplex units into one single-family detached dwelling. The location of this southern portion of the building on the subject property lies within the City of Dover’s Historic District zone requires the review and issuance of an Architectural Review Certificate (ARC) for exterior changes involving construction and demolition activities. Minor demolition, residential additions of certain sizes, and siding projects are eligible for Staff review of the ARC during the Building Permit application process. Project activities are reviewed for compliance with the Zoning Ordinance and the Design Standards and Guidelines for the City of Dover Historic District Zone as stated in Zoning Ordinance, Article 10 Section 3.25(A). 3.25 Architectural review standards. (A) An architectural review certificate may be issued if it is found that the architectural style, general design, height, bulk and setbacks, arrangement, location and materials and structures affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district as set forth in the historic district design guidelines and standards adopted by the planning commission and as set forth in the United States Secretary of the Interior's Standards for Rehabilitation. In reviewing the proposed project for Architectural Review Certification, Staff referenced the P. O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 22

Page 23

Item 4. Letter of Referral to the Historic District Commission: Permit #24-1399 Demolition, Addition, & Renovations at 21 N. American Avenue, Dover October 8, 2024 Page 2 of 2 Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of the Design Standards and Guidelines which present the Recommended, Not Recommended, and Inappropriate approaches to activities in the Historic District. The Design Standards and Guidelines do not recommend the use of vinyl siding and does not recommend the removal of certain architectural elements. Chapter 4: New Construction, Addition, Demolition and Relocation of the Design Standards and Guidelines was also consulted regarding the demolition and reconstruction of the rear addition. The location of the rear addition work is visible from N. American Avenue. Therefore, I am referring the Building Permit application to the Historic District Commission for consultation regarding the proposed project activities. See Zoning Ordinance, Article 10 Section 3.22 (A) and (B) listed below. Section 3.22 Architectural review certification by the city planner. (A) An architectural review certificate for specific classes of building permits, including fences, signs, siding, window and door replacement, roofing, the addition or replacement of decorative features, minor demolition, residential additions, and other construction of a minor nature, may be issued by the city planner, after a review and determination that the proposed construction is in general accordance with the standards set forth in subsection 3.25 (B) The city planner may refer any permit application for demolition or construction in the historic district for consultation with commission. The City of Dover Historic District Commission will review this Permit at their next meeting scheduled for Thursday, October 17, 2024 at 3:30pm. Options for participating in the Meeting include attending In-Person at the Council Chambers at City Hall, 15 Loockerman Plaza and or attending the Virtual Meeting presentation using Webex, an audio and video conferencing system. A separate meeting invitation to Join the Meeting virtually will be sent by email to the applicants; where you can clink “Join Meeting” to attend that afternoon. This Permit Referral has been assigned Application #HI-24-08. You are encouraged to participate in this meeting to discuss the project. Staff will provide the Historic District Commission with the permit application materials and other background information for their review and action. Planning Staff is preparing a Report on this Permit which will be forwarded to you in the upcoming days. If you have questions or wish to discuss alternative options, please contact the Planning Office at (302)736-7196. Sincerely, Department of Planning and Inspections Dawn Melson-Williams, AICP Principal Planner CC: Building Permit #24-1399 HI-24-08 23

Page 24

Item 4. 24

Page 25

Item 4. REVISIONS BY GENERAL RESIDENTIAL NOTES: GENERAL HVAC NOTES: RESIDENTIAL ELECTRICAL NOTES: PARTIAL DEMOLITION & GENERAL PLUMBING NOTES: CITY OF DOVER, DE PERMIT SET - 9/24/2024 1. ALL WORK SHALL BE DONE IN CONFORMANCE WITH THE 2009 IRC. & THE CODES 1. ALL WORK SHALL BE PERFORMED IN FULL COMPLIANCE WITH THE LATEST 1. HVAC WORK SHALL CONFORM TO STATE & LOCAL CODES, ORDINANCES & 1. ELECTRICAL PLANS ARE PREPARED BY OTHERS. AND ORDINANCES OF THE CITY OF DOVER. EDITIONS OF THE FOLLOWING CODES AND STANDARDS: IBC, NFPA, UL, & IPC. REGULATIONS & SHALL MEET OR EXCEED MINIMUM ASHRAE & SMACNA RECOMMENDATIONS. 2. THE REQUIREMENTS OF THE FOLLOWING SHALL GOVERN THE EQUIPMENT, 2. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE. DO NOT SCALE THE DRAWINGS. 2. IT IS THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO PROVIDE ALL LABOR, TOOLS, MATERIALS AND SUPERVISION TO COMPLETE ALL THE PLUMBING WORK AS DESCRIBED ON THE DRAWINGS. ALL INCIDENTAL 2. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO PROVIDE ALL LABOR, TOOLS, MATERIALS & SUPERVISION TO COMPLETE ALL THE HVAC WORK AS MATERIALS, AND INSTALLATION NATIONAL ELECTRICAL CODE, NATIONAL BOARD OF FIRE UNDERWRITERS, AUTHORITIES HAVING JURISDICTION. ALL MATERIALS AND EQUIPMENT SHALL BE ALL APPROVED FOR THE INTENDED REPLACEMENT ADDITION FOR THE ACHENBACH 3. ALL DIMENSIONS ON DRAWINGS ARE TO EXTERIOR FACE OF SHEATHING TO MATERIALS NORMALLY REQUIRED FOR AN OPERATIONAL PLUMBING SYSTEM, DESCRIBED IN THESE NOTES. ALL INCIDENTAL MATERIALS NORMALLY USE. FACE OF STUD, UNLESS OTHERWISE NOTED. ARE UNDERSTOOD TO BE THE RESPONSIBILITY OF THE PLUMBING REQUIRED FOR AN OPERATIONAL HVAC SYSTEM, ALTHOUGH NOT CONTRACTOR. ALL WORK INCLUDING MATERIALS ARE SUBJECT AT THE SPECIFICALLY IDENTIFIED IN THESE NOTES, ARE UNDERSTOOD TO BE THE 3. THE ELECTRICAL CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS 4. THE CONTRACTORS SHALL VERIFY ALL DIMENSIONS, CONDITIONS, ETC. OWNER'S APPROVAL. ANY QUESTIONS PERTAINING TO THIS PROJECT MUST BE RESPONSIBILITY OF THE HVAC CONTRACTOR. ALL WORK INCLUDING REQUIRED FOR THE COMPLETION OF HIS WORK. THE ELECTRICAL PERTAINING TO THE WORK BEFORE PROCEEDING. THE ARCHITECT MUST BE RESOLVED WITH THE OWNER PRIOR TO COMMENCING WORK. MATERIALS ARE SUBJECT TO APPROVAL OF THE OWNER'S CONTRACTOR SHALL ARRANGE AND PAY FOR ALL INSPECTIONS AND NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND/OR CONDITIONS REPRESENTATIVE. ANY QUESTIONS PERTAINING TO THESE NOTES OR TO TESTS REQUIRED BY THE ABOVE AGENCIES. HE SHALL FURNISH REQUIRED SHOWN ON THESE DRAWINGS. ANY SUCH VARIATION(S) SHALL BE RESOLVED 3. THE PLUMBING CONTRACTOR SHALL COMPLY WITH ALL THE REQUIREMENTS OF LOCATIONS OF EQUIPMENT MUST BE RESOLVED WITH THE OWNER'S CERTIFICATES OF INSPECTION TO THE OWNER, INCLUDING THE ELECTRICAL HOUSE BY THE ARCHITECT BEFORE PROCEEDING WITH THE WORK, OR THE FEDERAL STATE AND KENT COUNTY AUTHORITIES. THESE INCLUDE DNREC, REPRESENTATIVE. CERTIFICATE FROM AN INSPECTION AGENCY LICENSED IN THE STATE OF CONTRACTOR SHALL ACCEPT FULL RESPONSIBILITY FOR THE COST TO KENT COUNTY PLANNING AND ZONING, HEALTH DEPT., AND BUILDING DELAWARE. RECTIFY THE SAME. INSPECTORS OFFICE. 3. DO NOT SCALE DRAWINGS. ACTUAL GRILLE AND DIFFUSER LOCATIONS TO BE DETERMINED BY FIELD CONDITIONS. CONTRACTOR IS RESPONSIBLE TO 4. IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROVIDE 5. EACH SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR THE JOINING OF HIS 4. THE PLUMBING CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS ROUTE & SIZE DUCTWORK TO PROVIDE REQUIRED HVAC TO EACH SPACE. ALL LABOR, TOOLS, MATERIALS AND SUPERVISION TO COMPLETE ALL THE WORK TO THE WORK OF OTHER TRADES. DISCREPANCIES SHALL BE REQUIRED FOR THE COMPLETION OF HIS WORK. HE SHALL ARRANGE AND PAY COORDINATE WORK WITH OTHERS. ELECTRICAL WORK AS DESCRIBED ON THE DRAWINGS. ALL INCIDENTAL IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT UPON FOR ALL INSPECTIONS AND TESTS REQUIRED AND FURNISH THE REQUIRED MATERIALS NORMALLY REQUIRED FOR AN OPERATIONAL ELECTRICAL DISCOVERY, OR BEFORE PROCEEDING WITH THE WORK OR ACCEPT FULL CERTIFICATES OF INSPECTION TO THE OWNER PRIOR TO FINAL PAYMENT. 4. PROVIDE FLEXIBLE CONNECTORS BETWEEN ALL MECHANICAL EQUIPMENT & SYSTEM, ALTHOUGH NOT SPECIFICALLY IDENTIFIED ON THE DRAWING, ARE RESPONSIBILITY TO RECTIFY THE SAME. DUCTWORK. UNDERSTOOD TO BE THE RESPONSIBILITY OF THE ELECTRICAL 6. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF THE CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY SHOWN, SIMILAR DETAILS OF 5. THE PLUMBING SYSTEM DESIGN AND PIPE ROUTING SHALL BE DETERMINED BY THE PLUMBING CONTRACTOR. ROUTING MAY BE MODIFIED BY THE CONTRACTOR AFTER VERIFYING ALL DIMENSIONS AND CONDITIONS FOR 5. FLEXIBLE DUCTWORK SHALL BE 8" DIAMETER, UNLESS OTHERWISE NOTED, PREFABRICATED INSULATED TYPE WITH VAPOR BARRIER. TOTAL LENGTH CONTRACTOR. ALL WORK INCLUDING MATERIALS IS SUBJECT TO APPROVAL OF THE OWNER. ANY QUESTIONS PERTAINING TO THESE NOTES OR LOCATIONS OF EQUIPMENT AND DEVICES MUST BE RESOLVED WITH 21 NORTH AMERICAN AVENUE POSSIBLE INTERFERENCES WITH MECHANICAL EQUIPMENT, DUCTWORK, SHALL NOT EXCEED 8'-0". THE OWNER. CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEW AND APPROVAL OF THE ARCHITECT AND STRUCTURAL ENGINEER. LIGHTS, AND STRUCTURAL SUPPORTS ETC. COORDINATE ALL WORK WITH OTHERS. 6. COORDINATE SUPPLY DIFFUSER & RETURN GRILLE LAYOUT WITH OWNER 5. THE ELECTRICAL SYSTEM DESIGN AND WIRE ROUTING SHALL BE DOVER, DELAWARE 19901 7. THE GENERAL CONTRACTOR SHALL PROVIDE BLOCKING AS REQUIRED FOR DETERMINED BY THE ELECTRICAL CONTRACTOR. ROUTING MAY BE 9/24/2024 TOILET ACCESSORIES, MECHANICAL, ELECTRICAL, AND OTHER ITEMS AS 6. THE PLUMBING CONTRACTOR SHALL DETERMINE INVERTS OF SANITARY PIPING 7. REFRIGERANT PIPING SHALL BE A.C.R. COPPER, TYPE "L" HARD. SIZE & MODIFIED BY THE CONTRACTOR AFTER VERIFYING ALL DIMENSIONS AND PROFESSIONAL CERTIFICATION: NECESSARY. AND ADJUST INDICATED SLOPES AS REQUIRED. ADJUSTMENTS SHALL CONFORM TO MINIMUM SLOPES AS PER IPC CODE (1/8" PER FOOT MINIMUM). INSTALL SUCTION, LIQUID & HOT GAS BYPASS LINES PER MANUFACTURER'S INSTRUCTIONS. SUCTION LINES SHALL BE INSULATED WITH ½" THICK CONDITIONS FOR POSSIBLE INTERFERENCES WITH MECHANICAL EQUIPMENT, PLUMBING, DUCTWORK, STRUCTURAL SUPPORTS, ETC. 2009 IRC PROJECT DATA SUMMARY: I CERTIFY THAT THESE DOCUMENTS WERE PREPARED UNDER MY SUPERVISION AND APPROVED BY ME, AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF 8. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS OF ARMSTRONG "AP ARMAFLEX" OR EQUAL. THE STATE OF DELAWARE, LICENSE 6. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL REQUIRED OWNER'S NAME NUMBER 5242, EXPIRATION DATE 12-31-2024 CONSTRUCTION SAFETY. THE CONTRACTOR IS RESPONSIBLE FOR JOB SAFETY 7. CLEAN OUTS (CO) TO BE THE SAME SIZE AS PIPE SERVICING UP TO 4" IN PIPE AND ADDRESS : ACHENBACH, MARK L AND SHORING AND BRACING OF ALL CONSTRUCTION. SIZE. FOR 4" AND LARGER PIPE SIZES, CLEAN OUTS ARE TO BE 4" IN SIZE. 8. PROVIDE ADDITIONAL DRAIN PAN UNDER AIR HANDLERS. PAN TO BE MINIMUM SUPPORTS FOR FIXTURES AND EQUIPMENT. ACHENBACH, ROBIN A POYNTER INSTALL CLEAN OUTS AS PLUGGED ENDS LEVEL WITH GRADES, FINISH 22 GAUGE GALVANIZED STEEL WITH 1" VERTICAL SIDES AND ¾" DRAIN 21 N AMERICAN AVE 9. THE CONTRACTOR IS RESPONSIBLE DURING THE CONSTRUCTION FOR FLOORS, WALL SURFACE, ETC. MAKE CLEAN OUTS ACCESSIBLE. CONNECTION. ROUTE ¾" PVC CONDENSATE PIPE FROM PAN TO DRAIN. 7. PROVIDE ALL WIRING, GROUNDING CONDUCTORS AND GROUNDING DEVICES DOVER, DE 19901 PROVIDING PROTECTION AS NECESSARY TO PRESERVE AND MAINTAIN THE INSULATE DRAIN LINE WITH ½" "AP ARMAFLEX" OR EQUAL. REQUIRED TO COMPLY WITH THE NATIONAL ELECTRICAL CODE. BUILDING, GROUNDS, LANDSCAPING, AND ADJACENT BUILDINGS AND 8. MAKE CHANGES IN DIRECTION AND CONNECTIONS OF DRAIN, SOIL AND WASTE TAX MAP NUMBER: 2 05 07705 02 2300 000 MATERIALS, AND TO ASSURE THE SAFETY OF THE PUBLIC. LINES WITH PROPER FITTINGS AND NECESSARY OFFSETS. 9. AIR TEST & BALANCE AIR HANDLERS TO DESIGN SUPPLY, OUTSIDE AIR & 8. MOUNT SWITCH OUTLETS 4'-0" A.F.F. BYPASS CFM, SUPPLY & EXHAUST. SUBMIT REPORT FOR REVIEW & ZONING : RG1 - GENERAL RESIDENCE 10. AT THE TIME OF PROJECT CLOSEOUT, THE CONTRACTOR SHALL CLEAN HIS 9. TRAP ALL FIXTURES AT A DISTANCE OF NO MORE THAN 2' FROM FIXTURE. THE APPROVAL. 9. MOUNT RECEPTACLES 8" ABOVE COUNTERTOPS OR SINKS WHERE HISTORIC DISTRICT WORK. LISTED BELOW ARE THE CLEANING OPERATIONS TO BE PERFORMED. DISCHARGE FROM ANY FIXTURE SHOULD NOT PASS THROUGH MORE THAN ONE INDICATED. MOUNT RECEPTACLES 6" A.F.F. UNLESS OTHERWISE NOTED. TRAP BEFORE REACHING THE DRAIN. PROVIDE TRAPS WITH SEAL OF 2½" 10. PROVIDE ACCESS DOOR AT COILS, VOLUME DAMPERS, & FIRE DAMPERS. APPLICABLE CODES: 2009 IRC A. REMOVE NON-PERMANENT PROTECTION AND LABELS. MINIMUM AND 4" MAXIMUM AND VENT TO PREVENT SIPHONING. 10. LIGHTING FIXTURES, FANS, ETC., SHALL BE SECURELY MOUNTED TO 2009 IEBC B. POLISH GLASS. 11. MOUNT THERMOSTATS AT 60" A.F.F. & WIRE TO CONTROL HEATING & OUTLET BOXES AND BUILDING CONSTRUCTION. PROVIDE LAMPS FOR ALL 2018 IPC C. CLEAN EXPOSED FINISHES. 10. INSTALL OFFSETS IN MAIN VENT LINES NOT LESS THAN 45 DEGREES TO COOLING SYSTEMS. FIXTURES. 2018 IMC D. TOUCH-UP MINOR FINISH DAMAGE. HORIZONTAL. CONNECT VENT LINE AT BOTTOM WITH SOIL AND WASTE LINE IN 2018 IFGC E. CLEAN OR REPLACE ALL MECHANICAL SYSTEMS FILTERS. SUCH A MANNER THAT FOREIGN DEBRIS WILL BE WASHED BY WATER FLOW 12. FURNISH & INSTALL DUCTED COMBUSTION MAKE UP AIR TO HVAC UNITS. 11. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ENERGIZING 2018 IECC F. REMOVE AND DISPOSE OF ALL DEBRIS FROM SITE. FROM FIXTURES. INSTALL BRANCH VENTS ABOVE TOPS OF FIXTURES TO WHICH LOCATE TO PREVENT INTAKE OF EXHAUST GASES. ALL DEVICES, FIXTURES, AND EQUIPMENT REQUIRING ELECTRICAL POWER. CITY OF DOVER, DE CODE OF ORDINANCES G. BROOM CLEAN UNOCCUPIED SPACES. CONNECTED. EXTEND VENT THROUGH ROOF A MINIMUM OF 12". FLASHING OF CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS H. CLEAN PLUMBING AND LIGHT FIXTURES. REPLACE BURNED VENT IS BY THE ROOFING CONTRACTOR. COORDINATE FINAL LOCATION OF VENT 13. HVAC SYSTEM DESIGN & DUCT ROUTING SHALL BE DETERMINED BY THE 12. COORDINATE FINAL LOCATION OF ALL ELECTRICAL OUTLETS, SWITCHES, OUT LAMPS. PIPE PENETRATIONS WITH THE MECHANICAL CONTRACTOR TO MAINTAIN A HVAC CONTRACTOR. ROUTING MAY BE MODIFIED BY THE CONTRACTOR SMOKE DETECTORS, TELEPHONE OUTLETS, FANS, AND LIGHT FIXTURES, EXISTING BUILDING AREA : FIRST FLOOR: 1,634 S.F. (±) I. VACUUM CARPETS. MINIMUM OF 10"-0" TO NEAREST HVAC INTAKE OR OPERABLE WINDOW. AFTER VERIFYING ALL DIMENSIONS & CONDITIONS FOR POSSIBLE ETC., WITH OWNER. SECOND FLOOR: 1,634 S.F. (±) INTERFERENCES WITH MECHANICAL EQUIPMENT, PLUMBING, LIGHTS, TOTAL: 3,264 S.F. (±) 11. ALL WOOD & FRAMING LUMBER IN CONTACT WITH MASONRY OR CONCRETE 11. DOMESTIC HOT AND COLD WATER AND CONDENSATE DRAIN PIPING WITHIN STRUCTURAL SUPPORTS, ETC. COORDINATE WORK WITH OTHERS. THE HVAC 13. OUTLET BOXES SHALL BE NONMETALLIC, NON-GANGABLE KNOCKOUT TYPE. SURFACES SHALL BE PRESSURE TREATED. BUILDING SHALL BE CPVC PLASTIC PIPE SOLVENT WELDED. SYSTEM SHALL BE SIZED IN ACCORDANCE WITH ASHRAE REQUIREMENTS. MINIMUM SIZE SHALL BE 4" X 2". PROVIDED PLASTER RINGS OF DEPTH EXISTING BUILDING AREA REQUIRED TO REACH FINISHED SURFACES. TO BE REMOVED: FIRST FLOOR: 204 S.F. (DEMOLITION) 12. TEMPORARY HEATING, COOLING, AND VENTILATION. 12. SANITARY WASTE AND VENT PIPE WITHIN BUILDING SHALL BE PVC SCHEDULE 14. THE CONTRACTOR SHALL FURNISH THE OWNER WITH OPERATION & SECOND FLOOR: 204 S.F. (DEMOLITION) 40 SOLVENT WELDED. MAINTENANCE INFORMATION FOR EQUIPMENT, SUCH AS MECHANICAL 14. COVER-PLATES FOR WIRING DEVICES SHALL BE SMOOTH UNBREAKABLE TOTAL: 408 S.F. (DEMOLITION) A. GYPSUM BOARD - 55° F MIN. DAY AND NIGHT DURING PRINTS, EQUIPMENT MANUALS, PREVENTIVE MAINTENANCE PROCEDURES & NYLON, IVORY COLOR. COVER-PLATES FOR WEATHERPROOF DEVICES ENTIRE JOINT TREATMENT OPERATION 13. INSULATE DOMESTIC HOT AND COLD WATER PIPING AND CONDENSATE DRAINS SCHEDULES, & NAMES & ADDRESSES OF QUALIFIED SERVICE AGENCIES. SHALL BE GASKETED LEXAN, SELF-CLOSING TYPE. AREA OF ADDITION: FIRST FLOOR: 259 S.F. AND UNTIL EXECUTION OF CERTIFICATE FROM AIR CONDITIONING UNITS WITH ½" THICK ARMSTRONG TYPE "AP SECOND FLOOR: 259 S.F. OF SUBSTANTIAL COMPLETION. ARMAFLEX". 15. INSTALL G.F.I. RECEPTACLES AS PER NATIONAL ELECTRICAL CODE. TOTAL: 518 S.F. B. WOOD FLOORING - 70° F MIN. WHERE MATERIAL IS 14. PRESSURE TEST ALL SOIL, WASTE AND VENT PIPING SYSTEMS UNTIL A 10"-0" 16. ALL FEEDS TO HAVE FULL SIZE NEUTRAL. TOTAL BUILDING AREA: 3,264 S.F. (±) STORED FOR ONE WEEK PRIOR TO MINIMUM STATIC HEAD OF WATER OR 5 PSIG MINIMUM AIR PRESSURE IS - 408 S.F. (DEMOLITION) INSTALLATION, CONTINUOUSLY DURING MAINTAINED FOR 60 MINUTES WITHOUT LOSS OF PRESSURE. COORDINATE 17. UPON COMPLETION OF THE WORK, THE ELECTRICAL CONTRACTOR SHALL + 518 S.F. (ADDITION) TESTING WITH OWNER. TEST CERTIFICATION IS REQUIRED UPON REQUEST. DEMONSTRATE THAT THE INSTALLATIONS ARE COMPLETE AND IN 3,374 S.F. (±) THE ACHENBACH HOUSE INSTALLATION, AND ONE WEEK AFTER APPLICATION OF FINAL COAT OF PERFECT OPERATING ORDER WITH WIRING FREE FROM GROUNDS OR FLOOR FINISH. 15. PRESSURE TEST ALL SYSTEMS OF DOMESTIC WATER PIPING IN PLACE FOR SHORTS AND WITH EQUIPMENT AND RACEWAYS PROPERLY GROUNDED. EXISTING BUILDING HEIGHT: 27 FEET ± 24 HOUR PERIOD TO 100 PSIG. MAXIMUM PRESSURE DROP 1% OF TEST C. RESILIENT FLOORING - 70° F MIN. DURING APPLICATION. PRESSURE. COORDINATE TESTING WITH OWNER. TEST CERTIFICATION IS 18. THE ELECTRICAL CONTRACTOR SHALL TEST ALL EQUIPMENT AND DEVICES ADDITION BUILDING HEIGHT: 21 FEET ± REQUIRED UPON REQUEST. INSTALLED TO THE SATISFACTION OF THE OWNER. RESPONSIBILITY AS TO D. CARPETING - 70° F MIN. AND 95° MAX. FOR ONE THE OPERATION OF ALL EQUIPMENT SHALL APPLY ONLY TO THOSE ITEMS WEEK PRIOR TO THE LAYING OF 16. ADJUST AND CLEAN ALL FIXTURES AND FITTINGS FOR PROPER OPERATION FURNISHED BY THE ELECTRICAL CONTRACTOR, BUT THE ELECTRICAL DESIGN VALUES: PARTIAL DEMOLITION & CARPET AND CONTINUOUSLY AND FLOW RATES. PROTECT CLOSET BOWL, LAVATORY, ETC., FROM DEBRIS CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ACCURATE WORK. DURING INSTALLATION. DURING WORK. REMOVE ANY DEBRIS FROM FIXTURE BEFORE APPLYING WATER FOR THE FIRST TIME AND LEAVE WORK AREA CLEAN AND FREE FROM ALL DIRT, ROOF LIVE LOAD: 25 PSF 21 NORTH AMERICAN AVENUE E. PAINTING - 55° F MIN. DURING PAINTING ETC. ROOF DEAD LOAD: 8 PSF OPERATIONS AND UNTIL DRY. 17. COMPLY WITH MANUFACTURER'S RECOMMENDATIONS AND NOTES FOR FLOOR LIVE LOAD(S): 40 PSF (LIVING SPACE) 13. ALL PAINTED AND COVERED GYPSUM BOARD SURFACES SHALL RECEIVE A 3 INSTALLATION OF EQUIPMENT. 30 PSF (BEDROOMS) COAT TAPE AND SPACKLE SYSTEM. ALL GYPSUM BOARD SHALL BE SCREWED TO THE SUB-FRAMING. 18. PROVIDE CHROME PLATED STOPS FOR EACH PLUMBING FIXTURE. PROVIDE WIND SPEED: 115 MPH BOLT CAPS FOR WATER CLOSETS. PROVIDE TAILPIECE FOR LAVATORIES AND REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 14. ALL GYPSUM BOARD WALL AND CEILING SURFACES TO BE PAINTED SHALL SINKS. CAULK BETWEEN FIXTURE AND FINISHED SURFACE WITH SILICONE ALLOWABLE DEFLECTION: L/180 (RAFTERS) RECEIVE ONE PRIME COAT AND TWO FINISH COATS OF PAINT. CAULKING. PROVIDE CHROME ESCUTCHEON FOR PIPING PENETRATION AT ALL L/240 (CEILING JOISTS) FINISHED SURFACE. L/240 (FLOOR JOISTS) 15. ALL WOOD AND METAL SURFACES TO BE PAINTED SHALL RECEIVE ONE PRIME COAT AND TWO FINISH COATS SEMI-GLOSS PAINT. 19. MAKE CONNECTIONS OF DISSIMILAR METALLIC PIPING WITH DIELECTRIC GROUND SNOW LOAD: 25 PSF UNIONS. 16. ALL DOOR HARDWARE TO BE RESIDENTIAL GRADE WITH BRIGHT BRASS FINISH. FROST DEPTH: 24 INCHES 20. IN SECOND FLOOR AREAS RUN WATER PIPING FROM CEILING PLENUM BELOW. 17. ALL EXTERIOR JOINTS, CRACKS, AND HOLES IN THE BUILDING ENVELOPE SHALL WEATHERING: SEVERE BE CAULKED, GASKETED, WEATHER-STRIPPED, OR OTHERWISE SEALED. THIS 21. THE PLUMBING CONTRACTOR IS RESPONSIBLE TO PROTECT ALL PIPING FROM INCLUDES (BUT IS NOT NECESSARILY LIMITED TO) AROUND WINDOWS AND FREEZING WEATHER CONDITIONS. LUMBER: #2 SPF Fb = 875 PSI DOOR FRAMES, BETWEEN WALL AND FOUNDATION, BETWEEN WALL AND ROOF, UTILITY PENETRATES, BETWEEN WALL PANELS AT CORNERS, AND AROUND 22. GAS PIPING TO BE SCHEDULE 40 BLACK STEEL PIPE WITH MALLEABLE IRON SOIL PRESSURE: 2500 PSF (ASSUMED) COVER SHEET, FLUE VENTS. SCREWED FITTINGS. PROJECT DATA, 18. ALL STAINED WOOD SURFACES TO RECEIVE TWO COATS OF STAIN AND TWO 23. ALL PIPING AND ACCESSORIES SHALL BE INSTALLED TO PERMIT ACCESS TO FINISHES COATS OF SATIN POLYURETHANE. SAND SURFACES BETWEEN EQUIPMENT FOR MAINTENANCE. DRAWING LIST: & GENERAL APPLICATIONS OF POLYURETHANE. 24. PLUMBING SYSTEM LAYOUT: NOTES 19. ALL ROOMS SHALL RECEIVE PAINTED WOOD BASE. G1.1 - COVER SHEET, PROJECT DATA & GENERAL NOTES A. LAY OUT THE PLUMBING SYSTEM IN CAREFUL COORDINATION WITH THE 20. ALL WOOD MOLDINGS AND TRIM TO BE PAINTED OR STAINED. DRAWINGS, DETERMINING PROPER ELEVATIONS FOR ALL COMPONENTS OF THE D1.1 - FOUNDATION DEMOLITION PLAN & DEMOLITION ELEVATIONS SYSTEM AND USING ONLY THE MINIMUM NUMBER OF BENDS TO PRODUCE A 21. ALL COUNTER TOPS TO BE PLASTIC LAMINATE SURFACED. CABINET FINISHES SATISFACTORILY FUNCTIONINGSYSTEM D2.1 - FIRST & SECOND FLOOR DEMOLITION PLANS SHALL BE AS SELECTED BY OWNER B. FOLLOW THE GENERAL FIXTURE LAYOUT SHOWN ON THE DRAWINGS. A1.1 - ADDITION/RENOVATION FOUNDATION PLAN, FOUNDATION NOTES, & FOUNDATION DETAILS 22. ALL COLORS AND FINISH TYPES TO BE SELECTED BY THE OWNER. C. LAY OUT THE PIPES TO FALL WITHIN PARTITION, WALL, OR ROOF CAVITIES, AND A1.2 - FIRST & SECOND FLOOR ADDITION/RENOVATION PLANS & WINDOW TYPES DRAWN 23. THE EXTERIOR SIDING SHALL BE VINYL. TO NOT REQUIRE FURRING OTHER THAN AS SHOWN ON THE DRAWINGS. WHL A1.3 - ADDITION/RENOVATION ROOF PLAN & WALL SECTION CHECKED 24. ALL WINDOWS TO BE DOUBLE HUNG THERMAL PANE WOOD CLAD OR SOLID 25. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE TO REVIEW AND EVALUATE THE EXISTING PLUMBING SYSTEM PRIOR TO BIDDING. OBSERVATIONS AND A2.1 - ADDITION/RENOVATION ELEVATIONS & NOTES & SECTIONS W.B. VINYL WITH SCREENS AND GRILLES. WINDOWS WILL BE APPROVED BY THE DATE CITY OF DOVER HISTORICAL COMMISSION DETERMINATIONS SHALL BE MADE AS TO THE DESIGN AND CAPACITY OF THE EXISTING PLUMBING SYSTEM TO CARRY THE ADDITIONAL PLUMBING NEEDS 24 SEPTEMBER 2024 FOR DETERMINED TO BE NECESSARY SHALL BE INCLUDED IN THE PLUMBING SCALE CONTRACTOR'S BID. NOTED JOB NO. R759-0424 SHEET G1.1 OF SHEETS 25

Page 26

Item 4. REVISIONS BY CITY OF DOVER, DE PERMIT SET - 9/24/2024 N/F BEHRAM HOLDINGS LLC N/F N/A TAX MAP #: 2-05-07705-02-2800 TAX MAP #: 2-05-07705-02-3100 DB-12124 PG-238 DB-N/A CURRENT ZONING: RG-1 CURRENT ZONING: RG-1 IRON PIPE N 78°33'28" E 4.08' FROM CORNER IRON REBAR EXISTING WOOD FENCE TO REMAIN N 77°30'22" E 2.84' FROM CORNER S 16°04'19" E 60.00' 1'-0" ± EXISTING SHED NAD 83 TO REMAIN IRON REBAR FOUND N. 423467.03 E. 625616.31 29'-11" REAR YARD EXISTING TREE TO REMAIN REMOVE EXISTING WOOD FENCE 9/24/2024 PROFESSIONAL CERTIFICATION: I CERTIFY THAT THESE DOCUMENTS WERE EXISTING TREES PREPARED UNDER MY SUPERVISION AND EXISTING WOOD FENCE TO REMAIN APPROVED BY ME, AND THAT I AM A DULY TO REMAIN LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF DELAWARE, LICENSE NUMBER 5242, EXPIRATION DATE 12-31-2024 B.R.L. EXISTING CHAIN LINK FENCE TO REMAIN (SEE SITE DATA COLUMN LOCATION MAP N 1" = 1000'-0" FOR OWNER INFORMATION, 76'-2" ± TAX MAP NUMBER, ZONING) TRUE NORTH EXISTING TREE TO REMAIN EXISTING DECK TO LEGEND SITE DATA COLUMN: REMAIN 5'-0" SIDE EXISTING IRON PIPE OWNER'S NAME N/F GOLDEN R. MYERS N/F JASON RAPHAEL DIXON YARD AND ADDRESS: ACHENBACH, MARK L EXISTING 130.00' ACHENBACH, ROBIN A POYNTER SHED TO EXISTING REBAR 21 N AMERICAN AVE REMAIN DOVER, DE 19901 EXISTING WOOD B.R.L. PROPERTY LINE TAX MAP #: 2-05-07705-02-2200 TAX MAP #: 2-05-07705-02-2500 FENCE TO REMAIN TAX MAP NUMBER: 2-05-07705-02-2400-000 S 73°55'41" W 16'-3" ± 13'-7" ± PROPERTY LINE ADJ. ZONING: RG-1 - GENERAL RESIDENCE EXISTING PORTION OF HISTORIC DISTRICT DB-673 PG-10 DB-11447 PG-231 NEW TWO STORY BUILDING SETBACK BUILDING TO BE REMOVED. REPLACEMENT 130.00' SEE DEMO PLANS ON APPLICABLE CODES: CITY OF DOVER CODE OF ORDINANCES ADDITION. SEE 2009 IRC SHEETS D1.1 & D1.2 FENCE FOUNDATION PLAN AND FIRST AND CURRENT ZONING: RG-1 CURRENT ZONING: RG-1 B.R.L. LOT AREA: 0.179 ACRES; 7800 S.F. SECOND FLOOR DEMOLITION PLANS ON SHEETS N 73°55'41" E A1.1 AND A1.2 EXISTING EXISTING BUILDING IMPERVIOUS AREA: 28.9% EXISTING RUNNING BOND - 2.7% TO BE REMOVED BRICK PAVER 16'-0" + 3.3% PROPOSED THE ACHENBACH HOUSE WALKWAY TO 29.5% NET TOTAL (45% ALLOWED) 5'-0" REMAIN PROPOSED BUILDING SIDE (SEE BUILDING AREA AND BUILDING HEIGHT IN 2009 IRC YARD PROJECT DATA SUMMARY ON SHEET G1.1) NEW REBUILD OF EXISTING REMOVE EXISTING BRICK PAVER COVERED PORCH AND NEW STEP. WALKWAY & SUBGRADE AS SEE FOUNDATION PLAN AND FIRST NEEDED FOR INSTALLATION OF PARTIAL DEMOLITION & AND SECOND FLOOR PLANS ON NEW COVERED PORCH AND STEP. 11'-8" SHEETS A1.1 AND A1.2 REPLACE BRICK PAVER WALKWAY IN KIND. 21 NORTH AMERICAN AVENUE EXISTING DUPLEX TO BE CONVERTED INTO SINGLE EXISTING RUNNING BOND FAMILY RESIDENCE BRICK PAVER WALKWAY TO REMAIN REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 26'-4" ± B.R.L. NAH 83 15'-0" FRONT YARD IRON REBAR FOUND EXISTING N. 423431.04 DRIVEWAY EXISTING EXISTING COVERED PORCH DRIVEWAY E. 625491.39 TO REMAIN TO REMAIN (SEE FIRST TO REMAIN FLOOR PLAN, SHEET A1.2) P.O.B. N 16°04'19" W 60.00' EXISTING CONC. EXISTING BRICK 200 FT ± TO DELAWARE AVE STEPS TO REMAIN STEPS TO BE REMOVED (SEE D1.2) EXISTING SIDEWALK TO REMAIN COVER SHEET, EXISTING SEWER CLEANOUT TO REMAIN PROJECT DATA, EXISTING GAS VALVE EXISTING WATER TO REMAIN METER TO REMAIN EXISTING WATER CURB & GENERAL VALVE TO REMAIN NOTES EXISTING WATER N AMERICAN AVE 60' ROW EDGE OF METER TO REMAIN PAVEMENT CITY OF DOVER MAINTAINED - LOCAL DRAWN WHL N N BASIC SITE PLAN CHECKED 1" = 10'-0" W.B. DATE NOTE: THIS SITE PLAN IS BASED ON AN EXISTING TRUE PROJECT 24 SEPTEMBER 2024 LOT CONSOLIDATION PLAN PREPARED BY NORTH NORTH SITEWORKS ENGINEERING ON APRIL 4, 2024 SCALE NOTED 0 10' 20' JOB NO. R759-0424 SHEET C1.1 OF SHEETS 26

Page 27

Item 4. REVISIONS BY CITY OF DOVER, DE PERMIT SET - 9/24/2024 EXISTING CHIMNEY TO REMAIN EXISTING SHED ABOVE TO REMAIN EXISTING HOUSE TO REMAIN 9/24/2024 7 6 1 PROFESSIONAL CERTIFICATION: I CERTIFY THAT THESE DOCUMENTS WERE PREPARED UNDER MY SUPERVISION AND APPROVED BY ME, AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF DELAWARE, LICENSE NUMBER 5242, EXPIRATION DATE 12-31-2024 7 EXISTING HOUSE TO REMAIN 1 3 6 4 2 7 REMOVE EXISTING FOUNDATION WALL 5 AND FOOTING 8 DEMOLITION - SOUTH ELEVATION 1/4" = 1'-0" REMOVE EXISTING FOUNDATION WALL REMOVE EXISTING AND FOOTING FOUNDATION WALL AND FOOTING THE ACHENBACH HOUSE EXISTING CHIMNEY TO EXISTING FOUNDATION / REMAIN CRAWL SPACE TO REMAIN PARTIAL DEMOLITION & ANY EXISTING EXTERIOR EXISTING FOUNDATION FOUNDATION WALL VENTS, INTERIOR WALL AND FOOTING FOUNDATION WALLS, MASONRY (ASSUMED) 21 NORTH AMERICAN AVENUE PIERS, AND GIRDERS NOT SHOWN BUILDING ELEVATION DEMOLITION NOTES: (SEE ALSO "GENERAL DEMOLITION NOTES" ON SHEET D1.2) REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 EXISTING HOUSE TO 1 REMOVE EXISTING ROOF STRUCTURE (SHINGLES, REMAIN UNDERLAYMENT, SHEATHING, RAFTERS, FASCIA) 2 REMOVE EXISTING WALL (VINYL SIDING, SHEATHING, WALL STUDS, INSULATION, DRYWALL) 7 3 REMOVE EXISTING DOOR, FRAME, & HARDWARE 4 REMOVE EXISTING WOOD POST 1 7 DEMOLITION 5 REMOVE EXISTING WOOD PORCH FRAMING AND 6 DECK BOARDS SOUTH & EAST 1 6 6 REMOVE EXISTING WINDOW ELEVATIONS & 7 REMOVE EXISTING ASBESTOS SIDING FOUNDATION 8 REMOVE EXISTING FOUNDATION WALL AND PLAN FOOTING 2 2 DRAWN WHL CHECKED W.B. DATE 24 SEPTEMBER 2024 SCALE 8 NOTED JOB NO. N R759-0424 DEMOLITION EAST ELEVATION FOUNDATION DEMOLITION PLAN SHEET D1.1 1/4" = 1'-0" 1/4" = 1'-0" PROJECT NORTH OF SHEETS 27

Page 28

Item 4. REVISIONS BY CITY OF DOVER, DE PERMIT SET - 9/24/2024 LEGEND EXISTING SHED EXISTING WALL AND DOOR TO BE REMOVED EXISTING WALL AND DOOR TO REMAIN GENERAL DEMOLITION NOTES: 1. CONTRACTOR SHALL SAFELY & LEGALLY REMOVE & DISPOSE OF ALL CONSTRUCTION DEBRIS OFF SITE. 2. CONTRACTOR SHALL REPAIR ANY EXISTING 9/24/2024 CONSTRUCTION TO REMAIN THAT IS DAMAGED PROFESSIONAL CERTIFICATION: I CERTIFY THAT THESE DOCUMENTS WERE DURING THE DEMOLITION PHASE. PREPARED UNDER MY SUPERVISION AND APPROVED BY ME, AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF 3. CONTRACTOR SHALL PROVIDE STRUCTURAL THE STATE OF DELAWARE, LICENSE SUPPORT OF ALL EXISTING CONSTRUCTION TO NUMBER 5242, EXPIRATION DATE 12-31-2024 REMAIN DURING THE DEMOLITION PHASE UNTIL THE NEW STRUCTURAL SUPPORT IS IN PLACE. 4. BUILDING RENOVATIONS MAY REVEAL HERETOFORE UNKNOWN CONSTRUCTION CONDITIONS. THESE REVEALED CONDITIONS WILL REQUIRE THEY BE REMOVE EXISTING APPROPRIATELY ADDRESSED FOR BUILDING CODE REMOVE EXISTING WALL COMPLIANCE DURING CONSTRUCTION. WALL AND ROOF ABOVE 5. ONCE THIS PORTION OF THE EXISTING WOOD FRAME WALL IS REMOVED, THE CONTRACTOR SHALL DETERMINE THE FINISH FLOOR HEIGHTS AND MAKE APPROPRIATE STEP MODIFICATIONS REMOVE EXISTING REMOVE EXISTING WALL AND ROOF WALL ABOVE REMOVE EXISTING REMOVE EXISTING WALL DOOR & FRAME REMOVE EXISTING WALL REMOVE EXISTING WINDOW & PORTION OF EXISTING WALL FOR NEW OPENING EXISTING HOUSE EXISTING HOUSE TO REMAIN TO REMAIN EXISTING CHIMNEY EX. WINDOWS TO REMAIN EXISTING REMOVE EXISTING CHIMNEY TO PORCH ROOF IN EXISTING ROOM REMOVE EXISTING EXISTING 18" X 60" TO REMAIN REMAIN PORCH FRAMING ACCESS DOOR TO ITS ENTIRETY TO REMAIN AND DECK BOARDS REMAIN SEE GENERAL DEMOLITION NOTE #5 REMOVE PORTION REMOVE EXISTING EXISTING ROOM REMOVE EXISTING THE ACHENBACH HOUSE OF EXISTING WOOD POST 11'-9" X 11'-5" WINDOWS WALL(S) REMOVE AND REPLACE REMOVE DOOR EXISTING 10" PORTION OF EXISTING & FRAME STEP WOOD TIMBER BEAM AT PARTIAL DEMOLITION & UP TOP OF WALL 21 NORTH AMERICAN AVENUE UP EXISTING WOOD EX. WINDOW FRAMED DUPLEX PARTY WALL TO REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 REMAIN EXISTING EXISTING ROOM ROOM TO REMAIN 9'-1" X 15'-6" EXISTING EXISTING CHIMNEY CHIMNEY TO TO REMAIN DN REMAIN EXISTING HALL REMOVE EXISTING DOOR & FRAME 6'-0" X 15'-6" FIRST & SECOND FLOOR DEMOLITION EX. WINDOW EX. WINDOW REMOVE EXISTING EXISTING PLANS VINYL RAILING AND SALVAGE FOR COVERED PORCH EXISTING PORCH REUSE TO REMAIN EXISTING PORCH EXISTING PORCH ROOF BELOW RAILING TO REMAIN RAILING TO REMAIN EXISTING BRICK DRAWN STEPS TO REMAIN WHL CHECKED REMOVE EXISTING CONCRETE STEPS W.B. DATE 24 SEPTEMBER 2024 SCALE NOTED JOB NO. R759-0424 N N SHEET FIRST FLOOR DEMOLITION PLAN SECOND FLOOR DEMOLITION PLAN D1.2 1/4" = 1'-0" 1/4" = 1'-0" PROJECT PROJECT NORTH NORTH OF SHEETS 28

Page 29

Item 4. REVISIONS BY CITY OF DOVER, DE PERMIT SET - 9/24/2024 RESIDENTIAL CONCRETE NOTES: EXISTING FOUNDATION WALL AND FOOTING 1. CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF THE FOLLOWING (ASSUMED) AMERICAN CONCRETE INSTITUTE (ACI) PUBLICATIONS EXCEPT AS MODIFIED BY THESE NOTES & THE PROJECT SPECIFICATIONS: A. "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE," ACI 318 EXISTING SHED ABOVE TO REMAIN B. "SPECIFICATIONS FOR STRUCTURAL CONCRETE," ACI 301 C. "RECOMMENDED PRACTICE FOR CONCRETE FLOOR & SLAB CONSTRUCTION," ACI 302 ST 2X8 SILL PLATE W/ FOAM SEALER D. "HOT WEATHER CONCRETING," ACI 305 1/2" Ø x 16" LONG A.BOLT @ 6'-0" O.C. E. "COLD WEATHER CONCRETING," ACI 306 MAX. 12" MAX AND 3 1/2" MIN FROM PLATE ENDS AND CORNERS. FILL BLOCK 2. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS: 4 COURSE 8" CMU CORES SOLID AT BOLT LOCATIONS FOUNDATION WALL APPROX. GRADE. SLOPE 6" PER 10'-0" A. F'C = 3,000 PSI: FOOTINGS & PIERS 4" Ø PERFORATED AWAY FROM BUILDING EXISTING FOUNDATION 6" MIN. 11'-5" (±, FIELD VERIFY) PVC SUMP DRAIN PIPE WALL AND FOOTING B. F'C = 3,500 PSI: EXTERIOR CONCRETE WALKS, STEPS WITH FILTER SOCK TO 3/8" PORTLAND CEMENT PARGING (FROM (ASSUMED) SUMP PIT (SEE T.O. FOOTING TO B.O. SIDING) W/ HENRY 101 2'-0" MINIMUM 3. CALCIUM CHLORIDE & CONCRETE ADMIXTURES CONTAINING CALCIUM CHLORIDE CRUSHED ROCK FOUNDATION PLAN) NON-FIBERED BLACK FOUNDATION COATING 1 1/2" Ø SUMP DRAIN ARE PROHIBITED. (OR EQ.) (FROM T.O. FOOTING TO T.O. OUTLET TO GRADE W/ 2" MIN. 6 MIL POLY GRADE) APPLIED TO EXT. F.O. CMU SPLASH BLOCK 4. USE OF ADMIXTURES IS SUBJECT TO THE WRITTEN APPROVAL OF THE NEW 60" Ø CORRUGATED METAL 16'-3" ± 9/24/2024 ARCHITECT. 20" X 10" CONC. FOOTING WINDOW WELL 2'-8" PROFESSIONAL CERTIFICATION: 10" CRUSHED ROCK I CERTIFY THAT THESE DOCUMENTS WERE 4'-3" 6'-8" 2'-8" PREPARED UNDER MY SUPERVISION AND 5. AIR ENTRAINMENT: ADMIXTURE SHALL CONFORM TO ASTM C260. ALL 32" X 24" METAL APPROVED BY ME, AND THAT I AM A DULY CONCRETE REMAINING EXPOSED TO THE WEATHER SHALL BE AIR-ENTRAINED; LICENSED ARCHITECT UNDER THE LAWS OF CRAWLSPACE ACCESS THE STATE OF DELAWARE, LICENSE AIR CONTENT = 5% PANEL AND FRAME NUMBER 5242, EXPIRATION DATE 12-31-2024 1'-0" MIN. 6. UNLESS NOTED OTHERWISE, SLAB-ON-GRADE SHALL BE 4" THICK WITH 6x6, CRUSHED W2.9xW2.9 W.W.F. ROCK 1'-8" S Ss.p. SLOPE 1/4" : FT 2'-8" TO SUMP PIT NEW 24" Ø FIBER- RESIDENTIAL MASONRY NOTES: NEW 2X10 FLOOR GLASS SUMP PIT SLOPE 1/4" : FT JOISTS @ 16" O.C. 8" X 16" 1. CONCRETE MASONRY WORK SHALL CONFORM TO THE REQUIREMENTS OF THE FOLLOWING AMERICAN CONCRETE INSTITUTE (ACI) PUBLICATIONS EXCEPT AS MODIFIED BY THESE NOTES & THE PROJECT SPECIFICATIONS: 1 TYPICAL FOUNDATION DETAIL 3/4" = 1'-0" NEW ST 2X10 LEDGER BOARD SECURED TO EXISTING HOUSE W/ 2 W/ PUMP NEW 8" CMU FOUNDATION WALL (TYP.) TO SUMP PIT CRAWLSPACE VENT (TYP. 2) A. "BUILDING CODE REQUIREMENTS FOR CONCRETE MASONRY ROWS 1/2" Ø X 5" LG NEW SUMP DRAIN PIPE 16'-0" STRUCTURE," ACI 531 HOT-DIPPED GALV. LAG TO SUMP (SEE 1/A1.1) SCREWS @ 30" O.C. B. "SPECIFICATION FOR CONCRETE MASONRY STAGGERED IN "V" NEW 20" W X 10" THK 1 PATTERN. PROVIDE & CONSTRUCTIONS," ACI 531.1 INSTALL SIMPSON LUS210 CONC. FOOTING (TYP.) A1.3 2. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE MASONRY UNITS: F'M = OR EQ. JOIST HANGERS FOR NEW 2X10 JOIST / NOTE: SET TOP OF NEW 1,500 PSI FOOTINGS TO ALLOW LEDGER CONNECTION NEW AND EXISTING 3. CONCRETE MASONRY UNITS SHALL CONFORM TO THE FOLLOWING: SUBFLOORS TO BE 27'-8" EDGE OF EXISTING FOUNDATION WALL FLUSH. A. HOLLOW LOAD BEARING CONCRETE MASONRY UNITS: ASTM C90, TYPE I, GRADE N. B. HOLLOW NON-LOAD BEARING CONCRETE MASONRY UNITS: ASTM C129, TYPE I, GRADE N. 4. MORTAR SHALL CONFORM TO "SPECIFICATIONS FOR MORTAR FOR UNIT MASONRY," ASTM C270, M OR S. NEW 2X6 5. MORTAR ADMIXTURES CONTAINING CALCIUM CHLORIDE OR OTHER CHLORIDES FLOOR JOISTS 11'-8" 44'-0" ARE PROHIBITED. USE OF OTHER ADMIXTURES IS SUBJECT TO THE WRITTEN @ 16" O.C. APPROVAL OF THE ARCHITECT. 1 THE ACHENBACH HOUSE 6. PROVIDE A MINIMUM OF 8" OF SOLID MASONRY UNDER ALL POINTS OF A2.1 BEARING. EXISTING FOUNDATION / 7. FILL CORES OF ALL UNITS CONTAINING ANCHOR BOLTS OR OTHER CRAWL SPACE TO REMAIN ANCHORAGES SOLIDLY WITH GROUT. ANY EXISTING EXTERIOR FOUNDATION WALL VENTS, INTERIOR PARTIAL DEMOLITION & FOUNDATION WALLS, MASONRY PIERS, AND GIRDERS NOT SHOWN 21 NORTH AMERICAN AVENUE 4'-0" REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 16'-4" 16'-4" EXISTING FOUNDATION WALL AND FOOTING (ASSUMED) FOUNDATION PLAN, FOUNDATION DETAIL, & FOUNDATION NOTES DRAWN WHL CHECKED W.B. N DATE FOUNDATION PLAN - ADDITION & RENOVATION PLAN 24 SEPTEMBER 2024 1/4" = 1'-0" SCALE PROJECT NOTED NORTH ELECTRICAL LEGEND JOB NO. 125 V GFCI RECEPTACLE R759-0424 S SHEET LIGHT SWITCH A1.1 Ss.p. SUMP PIT SWITCH LED LIGHT FIXTURE OF SHEETS 29

Page 30

Item 4. REVISIONS BY CITY OF DOVER, DE PERMIT SET - 9/24/2024 EXISTING SHED 11'-5" (±, FIELD VERIFY) 16'-3" (±) NEW ADDITION, MATCH EXISTING BUILDING WIDTH 5'-4" 3'-5" 7'-6" 16'-3" ± NEW ADDITION, MATCH EXISTING BUILDING WIDTH 9/24/2024 PROFESSIONAL CERTIFICATION: I CERTIFY THAT THESE DOCUMENTS WERE 4'-11" 4'-11" 6'-5" 4'-11" PREPARED UNDER MY SUPERVISION AND BATH FAN APPROVED BY ME, AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF EXHAUST VENT THE STATE OF DELAWARE, LICENSE NUMBER 5242, EXPIRATION DATE 12-31-2024 HB D B B NEW 30" X 60" ACCESSIBLE LEGEND 4'-10" TAHOE KOHLER K-2890-4 LAVATORY CAST IRON SHOWER NEW SINK NOTE: NEW ATTIC ABOVE IS INACCESSIBLE, NEW FULL NOT HAVING MORE THAN 30 S.F. OF ATTIC 8'-8" NEW WALL & BATH SPACE WITH MORE THAN 30 INCHES OF 16'-0" NEW ADDITION F BASE CABS NEW ADA VERTICAL HEIGHT MEASURED FROM TOP NEW 36" X 21" EXISTING WALL AND DOOR TO REMAIN A TOILET W/ ADA OF CEILING FRAMING TO BOTTOM OF ROOF 16'-0" NEW ADDITION NEW 2868 GRAB-BARS VANITY W/ ADA KNEE FRAMING. & TOE CLEARANCE NEW ROOM 6'-4" 2X10 CEILING 1 1 NEW ROD & SHELF JOISTS @ 16" O.C. A1.3 A1.3 NEW CLO. NEW WALL AND DOOR 2X8 CEILING JOISTS @ 16" O.C. NEW MUDROOM 6'-10" NEW DOUBLE NEW CEILING MOUNTED SMOKE / CARBON A SD CM MONOXIDE DETECTORS, HARDWIRED AND NEW 3068 SD 4'-10" 5'-8" ± INTERCONNECTED, W/ BATTERY BACK-UPS SLIDING 5068 CM MAKE FLUSH NEW DOUBLE 5" F 80 CFM BATH FAN VENTED THROUGH 2X12 HEADER NEW DOUBLE EXTERIOR WALL TO OUTSIDE EXISTING HOUSE 2X12 HEADER EX. WINDOW EX. WINDOW TO REMAIN FLUSH HB NEW 3'-0" HOSE BIB EXISTING HOUSE 3'-9" ± 800 LB WIDE SILL 3'-10" ± STRAP TIE NEW 4'-0" WIDE 4'-1" 4'-0" TO REMAIN CASED EXISTING CHIMNEY EXISTING OPENING ALL EXISTING CHIMNEY TO 4'-0" ± 11'-8" NEW PORCH REBUILD TO REMAIN PARTITIONS IN THIS NEW CASED OPENING REMAIN AREA ARE TO REMAIN. 44'-0" PORCH EXISTING ROOM C 11'-8" NEW PORCH NEW DOUBLE EXISTING ROOM NO RENOVATION WORK 4'-0" TO REMAIN TO THIS PORTION OF ROOF REBUILD 44'-0" TO REMAIN 1 SECOND FLOOR IS 1 THE ACHENBACH HOUSE 2X12 HEADER A2.1 PROPOSED. NEW TIMBER A2.1 REPLACEMENT SD CM BEAM ABOVE C A SET TYPE "C" WINDOW 3'-10" ± WOOD STEP SD TO GRADE EXISTING 10" HEAD HEIGHT @ B.O. 3'-11" ± CM (SEE 1/A2.1) NEW BEAM (TYP. 2; STEP FIELD VERIFY) PARTIAL DEMOLITION & UP 28'-0" ± EXISTING 28'-0" ± EXISTING 21 NORTH AMERICAN AVENUE UP A B C D 20'-0" (FIELD VERIFY) EX. WINDOW EX. WINDOW DH2860 DH4060 TSM2812 DH2836 NEW EXISTING WOOD SD TO REMAIN TO REMAIN CLO. EXISTING REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 CM STEPS TO REMAIN EXISTING ROOM TO ROOM TO REMAIN NEW WINDOW TYPES REMAIN 16'-4" 16'-4" NEW 2068 1/4" = 1'-0" EXISTING ALL WINDOWS TO BE VIWINCO S-SERIES OR EQUAL, SD CHIMNEY TO CM EXISTING CHIMNEY DOUBLE HUNG, WHITE, WITH GRILLES AND SCREENS, REMAIN 5/8" LOW E THERMAL PANE DN TO REMAIN U-FACTOR: 0.30 SHGC: 0.38 EXISTING SET WINDOW HEADS @ 6'-8" A.F.F. UNLESS OTHERWISE NOTED ON PLANS HALL TO INFILL WALL PROVIDE ALL NEW WINDOWS WITH 3 PLY 2X10 REMAIN FIRST & HEADERS UNLESS OTHERWISE NOTED ON PLANS OPENING SECOND FLOOR EX. WINDOW EX. WINDOW EX. WINDOW ADDITION / TO REMAIN TO REMAIN TO REMAIN RENOVATION EXISTING PORCH 6'-0" EXISTING PORCH PLANS & NEW VINYL RAILING SYSTEM TO MATCH ROOF BELOW TO WINDOW TYPES EXISTING REMAIN REUSE SALVAGED DRAWN PORTION OF EXISTING WHL RAILING HERE CHECKED 16'-3" ± 16'-3" ± W.B. DATE 32'-6" ± EXISTING 24 SEPTEMBER 2024 SCALE NOTED JOB NO. N N R759-0424 SHEET FIRST FLOOR ADDITION & RENOVATION PLAN SECOND FLOOR ADDITION & RENOVATION PLAN A1.2 1/4" = 1'-0" 1/4" = 1'-0" PROJECT PROJECT NORTH NORTH OF SHEETS 30

Page 31

Item 4. REVISIONS BY CITY OF DOVER, DE 30 YR ARCHITECTURAL PERMIT SET - 9/24/2024 SHINGLES 2X10 RAFTERS @ 16" O.C. INSULATION BAFFLE ICE AND WATER SHIELD UNDERLAYMENT 1/2" OSB 1'-0" 12 3 1 " MI 2.5 ± ALUMINUM DRIP EDGE 2 N. 5" ALUM "K" STYLE GUTTER RAFTER BEARING R-38 BATTS ALUMINUM WRAPPED 2X6 EXISTING SHINGLED FASCIA BOARD ROOF TO REMAIN 1/2" DRYWALL VENTED VINYL SOFFIT 2X8 CEILING JOISTS @ 16" O.C. RAFTER NOTCHED @ OVERHANG 2X6 DOUBLE TOP PLATE 1'-0" OVERHANG (TYP.) 9/24/2024 PROFESSIONAL CERTIFICATION: I CERTIFY THAT THESE DOCUMENTS WERE PREPARED UNDER MY SUPERVISION AND APPROVED BY ME, AND THAT I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF DELAWARE, LICENSE NUMBER 5242, EXPIRATION DATE 12-31-2024 8'-1" VINYL SIDING NEW 3X4 ALUMINUM 1/2" DRYWALL DOWNSPOUT W/ 1/2" OSB SPLASHBLOCK (TYP.) R-19 BATTS TYVEK HOMEWRAP OR EQUAL NEW 30 YR ARCHITECTURAL 2X6 STUDS @ 16" O.C. SHINGLES EXISTING SHINGLED NEW 5" ALUMINUM ROOF TO REMAIN "K" STYLE GUTTER 2X6 SOLE PLATE (TYP.) 3/4" T&G ADVANTECH GLUED & SCREWED ± 2.5:12 ROOF PITCH SUBFLOOR 1 A1.3 1'-0" OVERHANG (TYP.) 2X10 JOISTS @ 16" O.C. SECOND FLOOR 2X10 RIM JOIST 10" 17'-0" B.O. CEILING JOIST EXISTING CHIMNEY 1/2" DRYWALL 2X6 DOUBLE TOP PLATE EXISTING SHINGLED ROOF TO REMAIN NEW 30 YR ARCHITECTURAL ± 2:12 SHINGLES ROOF PITCH 1 THE ACHENBACH HOUSE A2.1 8'-11" PARTIAL DEMOLITION & 8'-1" VINYL SIDING 1/2" DRYWALL 21 NORTH AMERICAN AVENUE 1/2" OSB R-19 BATTS TYVEK HOMEWRAP OR EQUAL EXISTING METAL 2X6 STUDS @ 16" O.C. ROOF TO REMAIN REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 2X6 SOLE PLATE 3/4" T&G ADVANTECH GLUED & SCREWED SUBFLOOR 2X10 JOISTS @ 16" O.C. FIRST FLOOR 2X10 RIM JOIST EXISTING METAL ROOF TO REMAIN ST 2X8 SILL PLATE W/ FOAM SEALER ADDITION / 1/2" Ø x 16" LONG A.BOLT @ 6'-0" O.C. R-19 BATTS MAX. 12" MAX AND 3 1/2" MIN FROM RENOVATION PLATE ENDS AND CORNERS. FILL BLOCK 4 COURSE 8" CMU CORES SOLID AT BOLT LOCATIONS ROOF PLAN & FOUNDATION WALL 4" Ø PERFORATED APPROX. GRADE. SLOPE 6" PER 10'-0" AWAY FROM BUILDING WALL SECTION EXISTING SHINGLED 6" MIN. PVC SUMP DRAIN PIPE ROOF TO REMAIN WITH FILTER SOCK TO 3/8" PORTLAND CEMENT PARGING (FROM SUMP PIT (SEE T.O. FOOTING TO B.O. SIDING) W/ HENRY 101 2'-0" MINIMUM CRUSHED ROCK FOUNDATION PLAN) NON-FIBERED BLACK FOUNDATION COATING (OR EQ.) (FROM T.O. FOOTING TO T.O. 2" MIN. 6 MIL POLY GRADE) APPLIED TO EXT. F.O. CMU 20" X 10" CONC. FOOTING DRAWN 10" CRUSHED ROCK WHL CHECKED W.B. 1'-0" MIN. DATE CRUSHED ROCK 1'-8" 24 SEPTEMBER 2024 SCALE NOTED 1 TYPICAL WALL SECTION 3/4" = 1'-0" N ADDITION / RENOVATION - ROOF PLAN 1/4" = 1'-0" R759-0424 JOB NO. SHEET PROJECT A1.3 NORTH OF SHEETS 31

Page 32

Item 4. REVISIONS BY CITY OF DOVER, DE PERMIT SET - 9/24/2024 EXISTING CHIMNEY TO REMAIN 1 A1.3 6 16 6 12 2.5± 4 3 1 RAFTER EXISTING HOUSE TO BEARING REMAIN A2.1 5 5 A A 1 15 8'-1" NEW VINYL SIDING BEYOND 15 9/24/2024 C 1 C PROFESSIONAL CERTIFICATION: I CERTIFY THAT THESE DOCUMENTS WERE 6 PREPARED UNDER MY SUPERVISION AND EXISTING HOUSE TO 16 4 3 SECOND FLOOR APPROVED BY ME, AND THAT I AM A DULY REMAIN LICENSED ARCHITECT UNDER THE LAWS OF RAFTER THE STATE OF DELAWARE, LICENSE 1 NUMBER 5242, EXPIRATION DATE 12-31-2024 BEARING NEW FLASHING BEYOND A 8'-1" ±7'-6" 1 EXISTING ROOF STRUCTURE TO REMAIN FIRST 9 8 FLOOR FIRST FLOOR 13 EXISTING WOOD FASCIA BOARD TO REMAIN WITH NEW 11 ALUMINUM WRAP 14 NEW 4X12 TIMBER REPLACEMENT BEAM (FIELD VERIFY) NEW FLASHING NEW ST 2X8 LEDGER BOARD NEW SIMPSON LRU26Z OR EQ. NEW FLASHING BEYOND ADDITION / RENOVATION - SOUTH ELEVATION NEW 30 YR ARCHITECTURAL SHINGLES 1/4" = 1'-0" NEW ICE & WATER SHIELD UNDERLAYMENT 12 ±1'-0" 2± NEW ALUM DRIP EDGE NEW 5" ALUM "K" STYLE GUTTER NEW 2X6 RAFTER BEARING RAFTERS @ 16" O.C. PLATE LINE NEW ALUM WRAPPED THE ACHENBACH HOUSE NEW SIMPSON H2.5A OR EQ. 2X6 FASCIA BOARD NEW ALUM WRAPPED ST B.O. BEAM 3 PLY 2X10 BEAM NEW VINYL SIDING BEYOND PARTIAL DEMOLITION & EXISTING CHIMNEY TO REMAIN BUILDING ELEVATION ADDITION/ 21 NORTH AMERICAN AVENUE RENOVATION NOTES: NEW 3068 DOOR BEYOND 1 NEW VINYL SIDING 2 NEW ALUMINUM RAKE ±7'-6" 12 2 2.5± 6'-8" MIN. 3 NEW ALUMINUM EAVE REPLACEMENT ADDITION FOR DOVER, DELAWARE 19901 4 NEW ALUMINUM GUTTER RAFTER BEARING 4 5 NEW ALUMINUM DOWNSPOUT WITH SPLASH BLOCK 1'-0" ± TREAD 5 6 NEW FLASHING 7 NOT USED NEW ST 5/4 X 6 DECK BOARDS 5/4 X 6 END DECK B B 8'-1" ±1'-0" (FIELD VERIFY) NEW FLASHING; CONTINUE BOARD 15 8 NEW WOOD DECK (SEE SECTION 1/A2.1) PAST JOIST HANGER NEW 1X10 BOARD ADDITION/RENO NEW ST 2X8 DECK PAINTED TO MATCH 9 NEW WOOD STEP W/ TREAD(S) @ 10" MINIMUM JOISTS @ 16" O.C. EXISTING, CUT AROUND AND RISER(S) @ 7 3/4" MINIMUM (SEE SECTION SOUTH & EAST NEW BRICK STEP 1/A2.1 FOR ACTUAL) NEW SIMPSON LUS28 OR EQ. EQ. SECOND FLOOR ELEVATIONS & 10 NOT USED NOTES & 1 17 EQ. 11 NEW CRAWLSPACE VENT NEW ST 2X8 LEDGER BOARD SECTIONS SECURED TO EXISTING HOUSE W/ 12 NEW CRAWLSPACE ACCESS PANEL WITH 2 ROWS 1/2" Ø X 5" LG HOT-DIPPED D WINDOW WELL GALV. LAG SCREWS @ 30" O.C. NEW BRICK PAVER WALKWAY STAGGERED IN "V" PATTERN IN RUNNING BOND TO MATCH 8'-1" 13 NEW PARGED CMU FOUNDATION WALL EXISTING (FIELD VERIFY) NEW WOOD STEP TO 14 SEE FOUNDATION PLAN AND DETAIL ON SHEET 2'-0" MIN. MATCH EXISTING (BY DRAWN A1.1 FOR FOOTING SIZES EXISTING FOUNDATION CONTRACTOR) WHL WALL AND FOOTING TO SEE FOUNDATION FIRST FLOOR 15 NEW VINYL CORNER CHECKED REMAIN DETAIL 1/A1.1 FOR 13 18 W.B. TYPICAL NOTES AND 16 NEW 30 YEAR ARCHITECTURAL SHINGLES DATE DIMENSIONS 24 SEPTEMBER 2024 COMPACTED FILL 17 NEW BATH FAN EXHAUST VENT 11 12 SCALE 14 NOTED 18 NEW HOSE BIB JOB NO. R759-0424 SHEET 1 COVERED DECK SECTION 3/4" = 1'-0" ADDITION / RENOVATION - EAST ELEVATION 1/4" = 1'-0" A2.1 OF SHEETS 32

Page 33

Item 4. 17 American Ave View to 19/21 N. American Avenue, Dover DE Dover, Delaware Google Street View Jul 2023 See latest date Image capture: Jul 2023 © 2024 Google 33

Page 34

Item 4. 34

Page 35

Item 4. 35

Page 36

Item 4. 36

Page 37

Item 4. 37

Page 38

Item 4. 38

Page 39

Item 4. 39

Page 40

Item 4. 40

Page 41

Item 4. 41

Page 42

Item 4. 42

Page 43

Item 4. 43

Page 44

Item 4. 44

Page 45

Item 4. 45

Page 46

Item 4. 46

Page 47

Item 4. 47

Page 48

Item 4. 48

Page 49

Item 4. 49

Page 50

Item 4. 50

Page 51

Item 4. 51

Page 52

Item 4. 52

Page 53

Item 4. 53

Page 54

Item 4. 54

Page 55

Item 5. City of Dover ARCHITECTURAL REVIEW STAFF REPORT Before Dover Historic District Commission October 17, 2024 Application: Legislative Hall Building Addition, HI-24-08 Owner: State of Delaware Location: East side of Legislative Avenue as the block between Martin Luther King Jr. Boulevard North and Martin Luther King Jr. South Address: 411 Legislative Avenue and Court Street Tax Parcels: ED-05-077.09-05-15.00-000 and ED-05-077.09-05-14.00-000 Size: 2.80 acres +/- and 0.43 acres +/- Present Uses: Legislative Hall Proposed Use: Legislative Hall with Building Addition to create new main public entrance and Plaza area with Monument Walk Present Zoning: IO (Institutional and Office Zone H (Historic District Zone) SWPOZ (Source Water Protection Overlay Zone) ROS (Recreational and Open Space Zone) H (Historic District Zone) For Consideration: Architectural Review Certification including alternative front yard setback I. PROJECT DESCRIPTION: The Historic District Commission will act on a recommendation for an Architectural Review Certificate for a Site Development Plan Application for a Site Development Plan Application for renovation and expansion of Legislative Hall. The proposal includes a three-story Building Addition on the east side of the existing Legislative Hall building creating a new main public entrance, a Plaza area with Monument Walk, and other site improvements. The main property of 2.80 acres+/- is zoned IO (Institutional and Office Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone) and the H (Historic District Zone). The other property of 0.43 acres+/- is zoned ROS (Recreational and Open Space Zone) and subject to H (Historic District Zone). The subject properties are located on the east side of Legislative Avenue as the block between Martin Luther King Jr. Boulevard North and Martin Luther King Jr. South. The owner of record is the State of Delaware. P. O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 55

Page 56

Item 5. HI-24-07 Legislative Hall Building Addition Architectural Review Staff Report for Historic District Commission October 17, 2024 Meeting Page 2 of 7 Property Addresses: 411 Legislative Avenue and Court Street. Tax Parcels: ED-05-077.09-05- 15.00-000 and ED-05-077.09-05-14.00-000. Council District 4. Surrounding Land Uses This subject property location in the block bounded by Legislative Avenue, Martin Luther Kings Jr. North, and Martin Luther King Jr. Boulevard South is part of the Capital Complex where multiple State buildings and offices are located. Across the street to the north is the Delaware Public Archives and to the south across the street is the Tatnall Building (offices) and the proposed location of the Legislative Hall Parking Garage and the Del-One Credit Union Building. Surrounding properties are zoned IO (Institutional and Office Zone) with other open space areas like the Legislative Mall area zoned ROS (Recreational and Open Space Zone). The surrounding properties are within the H (Historic Zone). Previous Applications The Legislative Hall Building at this location was constructed c. 1931-1933 with later building additions in 1965-1970 and in 1994. Prior to that the Delaware General Assembly met in the Old State House building located on The Green. (Previous Application: MI-94-17 Legislative Hall: Proposed Landscape Plan.) II. HISTORIC PROPERTY INFORMATION Review of Historic Maps A series of historic maps were reviewed by Planning Staff for preliminary information on the area and found that the area was predominately open space with scattered buildings until the 1930s when the new Legislative Hall was constructed and the street network that we know today begins to be constructed as the Capital Complex area developed with various government buildings. Property Information This property is not listed in the National Register of Historic Places. The property is located within H (Historic District Zone) as established by the City of Dover. The development area consists of two parcels and a street/drive aisle area. The existing Legislative Hall Building is on the western parcel in the block and then the eastern area (street/drive aisle area and east parcel) are an existing parking lot and landscape open space area. III. PROJECT PROPOSAL PROJECT PROPOSAL (Submission of September 2024): The application proposes renovation and expansion of Legislative Hall involving construction of a Building Addition on the east side of the building to include a new main public entrance and a Plaza are with Monumental Walk with other site improvements. This is associated with a separate project previously reviewed for the Legislative Hall Parking Garage Project (HI-24-04 and S-24-14). The Applicant submission includes a Design Narrative, series of site plan graphics, building elevations, and 3-D views, and schematic building footprint/site plan and architectural drawings. The elements of the project are as follows: 56

Page 57

Item 5. HI-24-07 Legislative Hall Building Addition Architectural Review Staff Report for Historic District Commission October 17, 2024 Meeting Page 3 of 7 1. Building Addition: The Building Addition is on the east side of the existing Legislative Hall building enclosing that side of the U-shaped building partially infilling the central court(yard) area. A new main public entrance will be created on this east side as a raised monumental entry with steps and accessibility ramps. The 3-story structure is brick and rises to a hipped roof (a height of 53 feet 6 inches to top of the roof top balustrade). The architecture of the Building Addition is brick with window openings with keystone headers and trimwork surrounds, cornice detailing, a series of dormer windows on the hipped roof in a concrete tile and turned gable roof elements. It continues the Colonial Revival style and detailing of the current Legislative Hall Building and the surrounding Capital complex buildings. 2. Plaza Area with Monument Walk: The east side of Legislative Hall will be reimagined into a tiered Plaza Area in three levels: main public entrance, the upper plaza, and lower plaza with Monument Walk. The Plaza levels include stair and ramp systems, patterned brick surface materials, landscaping areas, lighting, and benches with connections to the sidewalk systems. Also incorporated is a Monument Walk where a series of monuments will be placed/relocated. This includes the relocation of the “Delaware Continentals” Revolutionary War Monument statue and four other monuments. 3. Sidewalks: The street frontage sidewalks along the project site will continue to be brick paving to match existing sidewalks in the surrounding area. Additional traffic control/identification measures are planned for crosswalk striping. More detailed crosswalks at streel level will cross Martin Luther King Jr. Boulevard South towards Legislative Hall Parking Garage and cross Martin Luther King Jr. Boulevard North towards the Delaware Public Archives. These crosswalks include landscape planter boxes and alternative surface materials of brick pavers. 4. Tree Planting and Landscaping: The project shows some street tree plantings and grass/landscaping areas as part of the tiered Plaza Area. See the attached Design Narrative and associated graphics and drawings for detailed information on building dimensions, locations, and material choices. IV. ZONING REVIEW The entire project site is located in the H (Historic District Zone) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards. The subject project area is zoned IO (Institutional and Office Zone) The IO zone allows the use for public and institutional building and makes the development subject to provisions of regulations the IO zone. The IO zoning district has a front yard setback of 10 feet; the building addition placement encroaches into this setback as the existing parking lot area/drive aisle is mapped as right-of-way. 57

Page 58

Item 5. HI-24-07 Legislative Hall Building Addition Architectural Review Staff Report for Historic District Commission October 17, 2024 Meeting Page 4 of 7 The Historic District Commission can consider alternative setbacks as part of their recommendation on the Architectural Review Certification. Review of DESIGN STANDARDS AND GUIDELINES The subject property is located in the Dover Historic District Zone within the Capitol Square Historic Context. The Capitol Square Context is described on pages 2-8 and 2-9. Location within the Dover Historic District Zone requires proposals for demolition, new construction, additions, and certain renovation or rehabilitation activities to existing buildings to receive an Architectural Review Certificate. As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted “if it is found that the architectural style, general design, height, bulk and setbacks, arrangement location and materials affecting the exterior appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a recommendation to the Planning Commission regarding the project’s compliance with the architectural review standards. Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings includes guidance related to various building elements and materials. This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the review considerations is given below. New Construction The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria and development guidelines. The guidelines specify the following individual considerations for new construction to be considered in the review by the Historic District Commission (and Planning Commission) of the project for Architectural Review Certification: • Style • Scale (building to reflect dominant cornice and roof height of adjacent buildings) • Elevation of the First Floor • Floor-to-Floor heights • Bays, windows, and doors (size, relationship, spacing of) • Absolute Size (compare overall size of new building) • Massing (relationship of solid-to-void) • Orientation (location of primary façade) • Proportions (comparison of height to width of building and elements) • Materials • Forms (shape of building and roof to be complementary) • Siting (location of building on lot and in relation to street) • High density/ large-scale construction Also, in Chapter 4 there is guidance related to “Additions to Existing Buildings” (Chapter 4: pages 4-8 through 4-10) which outlines similar topics of Siting, Scale, Elevation of the First Floor, Floor- 58

Page 59

Item 5. HI-24-07 Legislative Hall Building Addition Architectural Review Staff Report for Historic District Commission October 17, 2024 Meeting Page 5 of 7 to-floor Height, Massing, Orientation, Proportions, Materials, Forms, and other guidance. Reading of this guidance finds that it is primarily focused on additions to residential and smaller scale buildings which have a front façade and rear. For this Legislative Hall Building Addition project, the considerations for New Construction are more appropriate, especially all four elevations of the building front on public streets. The proposed project must also be reviewed for compliance with the standards established by the Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage, height, etc. This Proposal for the Building Addition appears to conform to most of the bulk requirements of the IO Zoning District except for the front yard setback due to the parcel configuration. The City of Dover Zoning Ordinance authorizes the Historic District Commission to recommend waiving certain bulk standards when issuing its recommendation to the Planning Commission for an Architectural Review Certificate if necessary. STAFF COMMENTS AND RECOMMENDATIONS The following are Staff comments and recommendations for this application regarding project activities and Architectural Review Certification. 1) Staff recommends conditional approval of the Architectural Review Certificate for the construction of the Building Addition and Plaza Area project finding that the building addition to be of compatible design with the existing building and the other nearby buildings. The proposal complies with the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone and with its recommendations for large-scale development in Capital Complex Historic Context. The proposed Building Addition siting continues the placement of the Building Addition and Plaza Area within proximity to street and sidewalk systems creating a scale in proportion to the pedestrian and viewscapes as you approach Legislative Hall. Its brick exterior finishes and detailing with building elements and sectioned wall surfaces break up the expanse of the building elevations continuing the architectural styles of the existing Legislative Hall building and the other government buildings in the Capital Complex. 2) The following conditions are recommended by Staff to improve the project’s compliance with the recommended guidelines of the Design Standards and Guidelines. The following are recommended conditions: a. The selected brick choices should be compatible with the brick of the existing buildings. b. Utilize black posts for any signage elements to be attached to posts i.e., traffic control signs. c. Signage identifying the Legislative Hall may be integrated into the building design. However, consideration of any free standing signage may require additional review. d. Any light fixtures/poles utilized on the property for site lighting should utilize a black finish color. Light fixtures/poles continue style of the lighting used in the nearby areas of the Historic District. e. Ensure proposed trees are appropriate to urban planting settings along streets and for Plaza Areas. Clarify where trees and landscaping are to be planted (or 59

Page 60

Item 5. HI-24-07 Legislative Hall Building Addition Architectural Review Staff Report for Historic District Commission October 17, 2024 Meeting Page 6 of 7 preserved) in the future Landscape Plan as the architectural renderings may only be concepts. f. Any revisions or changes in the identified materials may be subject to further review by the Historic District Commission. 3) Some of the site improvements/amenities were not specifically described or had limited information within the application information. Please provide information for consideration and discussion. a. Identify if any bicycle parking rack will be part of the Plaza Area. The bicycle parking rack should be black in finish color and of a decorative style if placed in this area. This location is near the Capital City trail. b. The location of the sidewalk along the street frontages must be evaluated with sidewalk construction standards as sidewalk placement typically includes a grass area along the curb line setting the sidewalk back from the curb and accessibility ramps. The minimum width of the sidewalk is five feet but may be greater. 4) The following items should be clarified regarding the building designs. a. Identify brick material (size, form, etc.) and patterning. 5) Staff notes that the project location (building and site) may be an opportunity for the continued incorporation of public art projects. The Monument Walk area is an opportunity to plan for future placement areas. 6) Staff recommends the following pertaining to the site design elements of the project: a. The sidewalk system on the street frontage should continue and include barrier free access, crosswalk striping, etc. at the points of intersection. b. Any proposed landscaping or tree planting locations, and lighting fixture locations should be depicted on the plan and maintain the character and type of these elements as they exist with the Capitol Complex area. c. We understand that research continues on the status of the mapped right-of-way area that crosses the eastern portion of the project area creating the two parcels. Future resolution of this matter may result in its abandonment and parcel consideration. 7) For building construction, the requirements of the building code or fire code must be complied with. Consult with the Chief Building Inspector and Fire Marshal for these requirements. The resolution of these items can impact the site design in some cases. 8) In the event that major changes and revisions to the design, materials, or site layout occur in the finalization of the plan and/or construction drawings contact the Department of Planning and Inspections. These changes may require resubmittal for review by the Historic District Commission. 9) This site development plan for this project is also subject to the application and review process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before the 60

Page 61

Item 5. HI-24-07 Legislative Hall Building Addition Architectural Review Staff Report for Historic District Commission October 17, 2024 Meeting Page 7 of 7 Planning Commission. Note: Additional technical items for compliance with the Zoning Ordinance and other regulations may be identified during the Site Plan Process. Review comments pertaining specifically to the Site Plan set will be issued at that time. The Site Development Plan was filed on October 4, 2024 to begin its review process (S-14-19). 10) The applicant shall be aware that Building Permits are required to proceed with any construction activities on the project site. The permit applications must comply with the approvals and conditions granted through the Architectural Review Certification and Site Plan Review process. 11) The applicant should be aware that a Sign Permit is required to proceed with the placement of signage on the property. Historic District Commission Action Required The Historic District Commission shall consider the proposal and provide a recommendation in regard to the Architectural Review Certification for the Building Addition and Plaza Area along with the associated Site Improvements. The recommendation should reflect consideration of the Design Standards and Guidelines for the City of Dover Historic District Zone. 61

Page 62

Item 5. From: Gabriel Cheung, NCARB, LEED-AP, ALEP 2500 Wrangle Hill Road, Suite 110 Bear, DE 19701 cheungg@StudioJAED.com To: Department of Planning & Inspections City of Dover PO BOX 475 Dover, DE 19903 Date: September 13, 2024 Re: Legislative Hall Addition – Design Narrative The project involves the renovation and expansion of the existing State of Delaware Legislative Hall building. Originally constructed in 1932, the existing building is three (3) stories in height above grade and serves as the capitol building for the State of Delaware. Housing the chambers of the Delaware General Assembly, the project includes three (3) stories of new building area for approximately 16,000 square feet per story for a total building area of approximately 133,400 square feet of building area. The project includes an additional 12,000 square feet of existing building renovation area. The expansion area features assembly committee, hearing and meeting rooms at the Ground and 1st Floor levels serving the existing Senate and House Chambers, including the creation of an open court area and secure entry Lobby. The 2nd Floor is limited to office use activity with open workspaces and clerical support areas as an extension of the existing building office use activity. The addition also contains an atrium spanning three (3) stories, connecting the Ground through 2nd Floor levels. There is an interior courtyard that is accessible from the 1st Floor. Site A new plaza is proposed in front of the Legislative Hall Addition, completing the semi-circular loop of Martin Luther King Jr. Blvd. The plaza is designed with three distinct levels: the main public entrance, the upper plaza, and the lower plaza/monument walk. The main public entrance, located at the center of the half-circle, serves as the focal point of the plaza. Monumental stairs lead to the entrance, with ramps on either side and brick planters filled with shrubs and trees in front. The entrance features three doors, with the central door being the most prominent, adorned with decorative elements, and acting as the primary access to the building’s 1st Floor. At the base of the monumental stairs lies the upper plaza, a versatile open space designed to accommodate a variety of gatherings and events, such as inaugurations and press conferences, with the main entrance serving as a podium or stage. The lower plaza connects directly to the sidewalk along Martin Luther King Jr. Blvd. This space will feature the relocated Revolutionary War Monument, “Delaware Continentals” Statue, at its center, while the other four monuments will be placed within surrounding green spaces. The walkway affectionally named “monument walk” provides a walking path connecting the monuments. The area will be enhanced with landscaping, shaded walkways, and benches, creating a welcoming environment for visitors to relax and enjoy the monuments. 62

Page 63

Department of Planning & Inspections City of Dover Item 5. Legislative Hall Addition – Design Narrative September 13, 2024 The sidewalk and plaza will be paved with brick to match the existing sidewalks in the Legislative Mall area. Red pavers will dominate, with accents of white to visually break up larger areas. Two new crosswalks are proposed between Legislative Hall and the parking garage and Delaware Archives Building. The crosswalk will be level with the street and marked with brick pavers, adhering to DelDOT standards for materials and signage. For additional safety, Rectangular Rapid Flashing Beacons (RRFB) will be installed at these crosswalks. Brick planter boxes with matching coping will line both sides of Martin Luther King Jr. Blvd., containing trees, shrubs, and low-growing plants. Special care will be taken in selecting plants to ensure they do not obstruct visibility for drivers or pedestrians. Monuments There are five (5) memorials and monuments that will be carefully removed, stored, and reinstalled as part of the new plaza. 1. Revolutionary War Monument “Delaware Continentals” Statue 2. Dover Light Infantry Monument 3. Middle East & Afghanistan Conflicts Monument 4. Medal of Honor Monument 5. World War II Monument Façade The proposed addition is conceived as a seamless extension of the existing building, thoughtfully designed to blend with the original structure in terms of materials, style, and architectural detailing. The intention is to maintain visual coherence while enhancing the building’s overall functionality and capacity. The architectural style of the addition mirrors that of the original structure, maintaining the same proportions, rhythm, and aesthetics. The addition will carry forward the existing building's use of symmetrical windows, gable roofs, and brick chimneys preserving its historical integrity or stylistic intent. Key features such as window shapes, mullion patterns, and keystones will be replicated to sustain uniformity across the façade. The addition will adhere to the same dimensional standards as the existing building, ensuring that it integrates seamlessly into the existing form. The overall height, depth, and width will be proportionally scaled to maintain balance and avoid overshadowing the original structure. Rooflines will align precisely, continuing the established roof pitch and eave heights to preserve the cohesive silhouette. Cornices, moldings, and other decorative trims will be meticulously replicated in the addition, ensuring continuity in detailing. The new cornices will match the profile, depth, and articulation of the existing ones, providing a unified aesthetic. Where appropriate, any distinctive architectural moldings will be carried through to the new structure, preserving the integrity of the building’s design language. Roof The addition will continue the hipped roof design around the entire perimeter of the building. The roofing material will be lightweight concrete tile, matching the material used in the recent roof replacement. An internal gutter system runs along the roof's perimeter, directing water to a rain collector box and downspout. The dormers will be finished with concrete tile siding, a flat seam copper roof, and matching trim. Rooftop balustrades will adorn the sloped roof, blending seamlessly with the existing structure. The 63

Page 64

Department of Planning & Inspections City of Dover Item 5. Legislative Hall Addition – Design Narrative September 13, 2024 flat section at the top of the hipped roof will be covered with a single-ply membrane. A sunken flat roof houses the chiller, which will remain hidden from street view and surrounding buildings. Sincerely, Gabriel Cheung, NCARB, LEED-AP, ALEP 64

Page 65

Item 5. Applicant: Legislative Hall Building Addition Variance Request #1: Variance from City of Dover Zoning Ordinance, Article 4, Section 4.15 Variance Requested: Variance from the required 10-foot front yard setback for the Institutional and Office (IO) zoning district. Project Background Information: The proposed project is located within the Historic District, City of Dover along Martin Luther King Jr Boulevard S/ Martin Luther King Jr Boulevard N. A variance is being requested to allow the building addition to encroach into the required 10-foot front yard setback. The addition is designed to enhance the operational capacity of the Legislative Hall while maintaining architectural continuity with the existing structure. The variance is for an encroachment of 6.7 ft into the required 10 ft setback to accommodate the addition's layout and functional needs. The encroachment is necessary due to existing site constraints, including the limited available space and the need to accommodate the functional requirements of the addition. This variance will enable the building to fulfill its intended function effectively, with the encroachment being minimal and having no significant impact on adjacent properties or the overall character of the area. 65

Page 66

Item 5. 66

Page 67

Item 5. 67

Page 68

Item 5. 68

Page 69

Item 5. 69

Page 70

Item 5. 70

Page 71

Item 5. 71

Page 72

Item 5. 72

Page 73

Item 5. 73

Page 74

Item 5. 74

Page 75

Item 5. 75

Page 76

Item 5. 76

Page 77

Item 5. 77

Page 78

Item 5. 78

Page 79

Item 5. 79

Page 80

Item 5. 80

Back to this meeting