Page 1
CITY OF DOVER, DELAWARE
COUNCIL COMMITTEE OF THE WHOLE MEETING
Tuesday, October 29, 2024 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Public comments are welcomed on any item and will be permitted at the appropriate time. When possible,
please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be
recognized.
VIRTUAL MEETING NOTICE
This meeting will be held in City Hall Council Chambers with electronic access via WebEx. Public
participation information is as follows:
Dial: 1-650-479-3208
Link: https://rb.gy/ur4k2l
Event number: 2537 174 1331
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting
starts.
CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER
ADOPTION OF AGENDA
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
ADOPTION OF THE AGENDA
1. Requests for Waivers – Appendix A - Subdivisions, Article VI - Subdivision - General
Requirements and Design Standards, Section A – Streets: Subdivision Waiver of
Requirement for Two Connections to Public Street and Section E – Lots: Subdivision
Waiver of Requirement for Lot Frontage on a Public Street as associated with Conditional
Use Site Plan/Master Plan for the development of Luther Village Planned Neighborhood
Design – Senior Citizen Housing Option (Apartment Units). Property Owner: Martin
Luther Foundation of Dover, Inc. Property Address: 101 Babb Drive. Tax Parcels: ED-
05-077.06-02-90.00-000, ED-05-077.06-02-90.01-000, ED-05-077.06-02-90.02-000, and ED-
05-077.06-02-90.03-000. Planning Reference: C-24-02) (Dawn Melson-Williams, Principal
Planner)
1
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING - October 29, 2024 PAGE 2
(Planning Commission Recommendation: Approval of Subdivision Waiver of Requirement
for Two Connections to a Public Street and Approval of Subdivision Waiver of Requirement
for Lot Frontage on a Public Street)
2. Presentation - Dover Municipal Freight Plan and Downtown Dover Pathways (Marilyn
Smith, Executive Director of the Dover/Kent County MPO, Cooper Bowers, DelDOT
Planning, and Leah Kacanda, Whitman, Requardt & Associates)
(Committee Action Not Required)
3. Presentation - Police Officer Standards and Training Commission (POST) (Sean Moriarty,
Executive Director)
(Committee Action Not Required)
4. Discussion - Community Concerns Surrounding Trash, Glass Bottles, and Needles (Bishop
Lott)
(Committee Action Not Required)
5. Discussion - Community Concerns Surrounding Trespassing (Kim Adams)
(Committee Action Not Required)
ADJOURNMENT OF THE SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING
UTILITY COMMITTEE
ADOPTION OF THE AGENDA
1. Evaluation of Bids - Persimmon Park Place Drainage Basin Improvements (Jason Lyon,
Water/Wastewater Director)
(Staff Recommendation: Award the contract to Gateway Construction, Inc. for the
Persimmon Park Place Drainage Basin Improvements, ITB #25-0006WW, for $1,198,025)
ADJOURNMENT OF THE UTILITY COMMITTEE MEETING
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
ADOPTION OF THE AGENDA
1. Presentation - Unsheltered Working Group (Leandra Marshall)
(Committee Action Not Required)
2. Discussion - Update on the State Pension (Naomi Poole, Human Resources Director)
(Committee Action Not Required)
2
Page 3
COUNCIL COMMITTEE OF THE WHOLE MEETING - October 29, 2024 PAGE 3
3. Presentation - Council Dashboard (Sharon Duca, Assistant City Manager)
(Committee Action Not Required)
4. Proposed Resolution No. 2024-15 - Creating Economic and Community Development
Funds (David S. Hugg, III, City Manager)
(Staff Recommendation: Adopt Proposed Resolution No. 2024-15 establishing Economic
Development and Community Development Funds.)
ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
3
Page 4
Item 1.
City of Dover
CONSIDERATION OF SUBDIVISION WAIVER REQUESTs
Review by Council Committee of the Whole: Safety Advisory & Transportation Committee
Recommendation from Planning Commission Meetings of September 16, 2024
with Staff and Development Advisory Committee Review
Plan Title: Luther Village Phase IV
Luther Village Planned Neighborhood Design – Senior Citizen
Housing Option
C-24-02
Plan Type: Conditional Use Site Plan Master Plan and Site Plan Phase IV
Minor Subdivision Plan for Phase IV
Associated Plans: C-02-02 Conditional Use Master Plan for PND-SCHO
S-03-07 Luther Village PND-SCHO: Phase 1
S-07-10 Luther Village PND-SCHO: Phase 2
C-13-03 Luther Village PND-SCHO: Master Plan and Phase 3
C-19-05 Luther Village Parking Lot Expansion
Owner: Martin Luther Foundation of Dover, Inc.
Site Area: Luther Village Total Area – 33.63 +/- acres
Phase 4 – 2.79 acres (proposed parcel)
Present Use: Planned Neighborhood Design Senior Citizen Housing Option
Residential (Phases 1, 2, and 3 - Apartment Buildings and Resident
Activity Room Building)
Agricultural Land
Proposed Use: Same with Phase IV – Apartment Building and Amenity Building
Connection
Overall Project: Planned Neighborhood Design Senior Citizen Housing Option
Apartment Buildings with Town Center building
Nine Phases: 8 Apartment Buildings (up to 524 units)
Resident Activity Room Building (3,566 S.F.) in Phase 3
Town Center Building (16,000 +/- S.F.)
Number of Dwelling Units: Phase 1 (complete) - 68 dwelling units (1 apartment building)
Phase 2 (complete) - 32 dwelling units (1 apartment building)
Phase 3 (complete) - 48 dwelling units (1 apartment building)
Total Built - 148 dwelling units
Phase IV proposed at 72 dwelling units (1 apartment building)
Total of all phases – 477 dwelling units shown (524 authorized)
Off Street Parking: Phase 1 – 68 parking spaces including 3 handicapped, 1 loading space
P. O. Box 475 Dover, DE 19903 4
Community Excellence Through Quality Service
Page 5
Item 1.
Phase 2 – 36 parking spaces including 3 handicapped, 1 loading space
Phase 3 – 68* parking spaces including 3 handicapped, 1 loading space
(*3 spaces removed for pedestrian access route – new total to be 65 spaces)
Parking Lot Expansion – 34 parking spaces including 2 handicapped
Phase IV – 82 parking spaces including 4 handicapped, 1 loading space
Future Phases - 290 parking spaces including 13 handicapped, 4 loading
spaces
Sewer & Water City of Dover
Zoning Classification: RG-2 (General Residence Zone)
PND-SCHO (Planned Neighborhood Design: Senior Citizen
Housing Option)
PND Considerations Granted: Alternative Design Standards Approved for PND:
Building Setback from Property Line (Side and Rear)
Building Spacing
Building Height
Number of Stories
Average Number of Dwelling Units Per Building
Off-Street Parking Reduction
Waiver Requests Granted: Partial Elimination of Upright Curbing
Reduction of Bicycle Parking
Waiver Request Withdrawn: Elimination of Rear Emergency Access
Subdivision Waiver Requests Recommended:
Wavier of Requirement for Two Connections to a Public Street
Waiver of Requirements for Lot Frontage on a Public Street
Planning Commission Recommendation:
The Conditional Use Site Plan/Master Plan Application C-24-02 Luther Village IV: PND-
SCHO was represented by the property owner’s representative and the applicant’s
engineering firm Landmark Engineering & Science. A Public Hearing was conducted at
the Planning Commission Meeting of September 16, 2024 where one member of the public
spoke and no written comments were received. The Planning Commission moved by vote
of 8-0 to grant conditional approval of Application C-24-02 with approval of Alternative
Design Standards for the PND; approval of the Waiver Requests for Partial Elimination of
Upright Curbing and Reduction of Bicycle Parking; and including recommendations of
approval of the Subdivision Waivers allowing for one connection to the Public Street and
allowing creation of a lot without frontage on a Public Street. (Draft Meeting Minutes
attached.)
These Subdivision Waiver Requests are forwarded to the Council Committee of the Whole: Safety
Advisory and Transportation Committee and City Council for consideration. The following is the
Development Advisory Committee (DAC) Report prepared for C-24-02 including the application
review narrative and Department/Agency Review comments and related information.
5
Page 6
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 3 of 18
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: September 4, 2024
APPLICATION: Luther Village Phase IV - Luther Village Planned Neighborhood Design:
Senior Citizen Housing Option
FILE #: C-24-02 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn E. Melson-Williams, AICP PHONE #: (302) 736-7196
I. PLAN SUMMARY:
Application C-24-02 is for Review of a Conditional Use Site Plan/Master Plan for the development
of Luther Village Planned Neighborhood Design – Senior Citizen Housing Option consisting of up
to 524 age-restricted apartment units in a total of nine phases. The Master Plan was previously
established by Applications C-02-02 and C-13-03 and Luther Village Phases I, II, and III have been
constructed. The plan for Phase IV consists of the construction of a three-story apartment building
with 72 units (age-restricted) and associated site improvements. The plan also includes a Minor
Subdivision to create a 2.79 acre+/- parcel for Phase IV from the overall 33.63 acre +/- tract. The
property is zoned RG-2 (General Residence Zone). The property is located east side of John Hunn
Brown Road and on the west side of Babb Drive. The owner of record is Martin Luther Foundation
of Dover, Inc. Property Address: 101 Babb Drive. Tax Parcels: ED-05-077.06-02-90.00-000, ED-
05-077.06-02-90.01-000, ED-05-077.06-02-90.02-000, and ED-05-077.06-02-90.03-000. Council
District 2. Consideration of Alternative Design Standards for PND: Building Setback from Property
Lines, Building Spacing, Building Height, Number of Stories, Average Number of Dwelling Units
Per Building, Off-Street Parking Reduction. Waivers to be Requested: Partial Elimination of
Upright Curbing, Reduction in Bicycle Parking Requirement, and Elimination of Rear Emergency
Access Requirement. Subdivision Waiver Requests: Waiver of Requirement for Two Connections to
a Public Street and Waiver of Requirement for Lot Frontage on a Public Street.
The phase of the project was recently the subject of MI-24-06 Luther Village IV: PND-SCHO
Concept Plan considered at City Council in June 2024 for Referral to the Planning Commission.
Previous Applications:
The subject site for Luther Village is located east of John Hunn Brown Road and west of the
continuation of Babb Drive in Dover, Delaware. This area is northeast of and adjoining the
Dover Crossing Shopping Center (Target and Safeway). The subject site was originally part of a
122.3+/- acre property previously proposed as the Amberfield Subdivision. A Minor Lot Line
Adjustment Plan recorded on May 30, 2002 created a thirty-four (34) acre parcel for the Luther
Village PND: Senior Citizen Housing Option project. The remaining area was later approved for
a separate residential development with the application for Clearview Meadow: Planned
Neighborhood Design (C-04-01 and SB-04-04).
6
Page 7
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 4 of 18
The Master Plan (C-02-02) approved by the Planning Commission in June 2002 and the updated
Plan (C-13-03) approved in May 2013 established the Luther Village Planned Neighborhood
Design-Senior Citizen Housing Option Plan to encompasses a total of nine (9) development
phases with eight (8) apartment buildings and a town center building for the senior citizen
community. The Planning Commission subsequently has reviewed each phase of construction and
three phases are completed to date. Luther Village Phase 1 (Application S-03-07) involved the
southwest portion of the Luther Village site for a 68-unit three story apartment building, an active
recreation walking trail area and with the stormwater management located in the northwest corner
of the site. Luther Village Phase 2 (Application S-7-10) consists of a 32-unit two story apartment
building. Luther Village Phase 3 (Application C-13-03) consists of a 48-unit four story apartment
building and a one story 3,566 SF resident activity room building. The buildings are
interconnected.
Application C-19-05 involved construction of an additional parking lot on the Luther Village
Phase 3 parcel. The parking lot identified for guest parking takes access from the on-site loop
road. It is to consist of thirty-four (34) parking spaces including two handicapped spaces. The
project includes an identified pedestrian connection to the Phase 3 apartment building and the
Resident Activity Room Building.
II. PROJECT DESCRIPTION
Application (MI-24-06) at City Council on June 10, 2024:
Due to lack of recent construction activity, the Plan approval for the overall Master Plan for the
Luther Village Planned Neighborhood Design-Senior Citizen Housing Option has lapsed. The MI-
24-06 submission restarted the process for approval of the project Master Plan with a Sketch Plan
Narrative Letter dated May 21, 2024 and a Concept/Sketch Plan set showing the overall Luther
Village PND-SCHO (as existing and proposed). MI-24-06 depicted the layout for continuation of
the internal loop drive, the existing and proposed apartment buildings, a town center building,
parking, stormwater management, walking trails systems, etc. MI-24-06 was reviewed by City
Council on June 10, 204 with action taken to refer it on for Planning Commission review.
Conditional Use Site Plan/Master Plan C-24-02:
The Luther Village Planned Neighborhood Design-Senior Citizen Housing Option Project.
continues to encompass a total of nine (9) development phases with eight (8) apartment buildings
and a town center building for the senior citizen community. The project was previously
approved for 524 apartment units; this Plan shows 477 apartment units. Each phase typically
consists of an apartment building, associated parking lots, stormwater management elements,
active recreation areas such as walking trails, and open space landscaping. The Master Phasing
Plan on Sheet CR-01 (dated 8/1/2024) also depicts the layout for continuation of the internal
loop drive, apartment buildings, town center building, parking, stormwater management, etc. for
the entire site.
This application also provides the details for Phase IV (4). For Luther Village Phase IV, a 72 unit
(age restricted) three story apartment building with a three-story resident amenity room building
is proposed which connects Phase IV to the Phase 3 Building.
III. ZONING REVIEW
The PND: Senior Citizen Housing Option is permitted all zoning classifications (with the
exception of the M, IPM and C-4 zoning classifications) as a conditional use. Article 3 §24.1b
7
Page 8
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 5 of 18
notes that “preference shall be given to those projects which are within close proximity to public
transit services, and which are situated within one-quarter (1/4) mile of a grocery store, pharmacy,
restaurant, physician offices, senior center or similar convenience service establishment.” The
PND: Senior Citizen Housing Option is intended to “…encourage the development of high-quality
housing opportunities design to accommodate the particular needs of senior citizens” by allowing
the Planned Neighborhood Design Option through the Conditional Use process. The PND must
present a community design that is in accordance with the goals and policies of the Comprehensive
Plan.
Review Process for Planned Neighborhood Design: Senior Citizen Housing Option:
The applicant is seeking an approval under the Planned Neighborhood Design Ordinance for the
Senior Citizen Housing Option (see Zoning Ordinance, Article 3, Section 24.1 (b)). The
Ordinance sets forth a two or three-step review and approval process. In the first step, the
developer meets with the City Council and presents a general sketch plan to determine whether
or not the proposed project is of such a design and type that warrants further review by the
Planning Commission.
On June 10, 2024, the City Council reviewed project and determined that further review is
warranted. The second step is a more detailed Conditional Use Site Plan review and public
hearing process before the Planning Commission. (Note: A third review step with the Planning
Commission may be required depending on the type, physical size, and complexity of the project
application. This is not required for this project.) The submittals of site development plans to the
Planning Commission for each phase of the project are reviewed for consistency with the
approved Master Plan (Conceptual Plan).
The current application to the Planning Commission represents the second step in the review
process for the Luther Village PND-SCHO to re-establish the Conditional Use/Master Plan and
for the review of the specific Site Plan Review for Phase IV. The Master Plan was previously
approved with Applications C-02-02 and C-13-03.
It is important to keep in mind that a PND proposal does not involve a rezoning of the land. The
Planned Neighborhood Design – Senior Citizen Housing Option is plan specific. The land would
remain zoned RG-2 (General Residence Zone). The PND option allows for a greater variety of
housing types and allows for commercial uses while requiring open space. Also, by the Zoning
Ordinance provisions, in the PND: SCHO the units shall be deed restricted to require that the
head of household for each housing unit be at least 55 years of age or older.
Comprehensive Plan Recommendations
The City of Dover 2019 Comprehensive Plan as amended recommends that this property be
utilized for Residential High Density development. As described in the Comprehensive Plan, High
Density involves a development pattern of eight or more dwelling units (pages 12-6 and 12-7).
The Luther Village project is noted as an example of development for Residential High Density.
The proposed Luther Village project involves a site density of over 14 dwelling units per acre.
The Comprehensive Plan also establishes stated goals for various types of land uses within the
City limits. The stated goal for Residential Land Uses is “to develop and maintain an adequate
supply of housing of varying type, size, and densities that are aesthetically pleasing and located
within neighborhoods designed or redesigned to promote convenience, conservation, and access
8
Page 9
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 6 of 18
to the greater community, but which are properly buffered through distance and landscaping from
incompatible land uses” (see page 12-3). A Policy is to “encourage high density residential
development in infill areas that are near essential services, public transit, and employment
opportunities.” One of the goals outlined in Chapter 11 – Housing & Community Development is
to “Encourage Balanced Housing Opportunities for all Residents of the City” which also includes
references to affordable housing.
The Comprehensive Plan also acknowledges the fact that the residents aged 65+ is a rapidly
growing segment of the population that will require more specialized services (page 3-5). This
trend was also identified in previous Comprehensive Plans and in response, a previous
Comprehensive Plan implementation strategy recommended the development of a Zoning Code
amendment permitting Senior Citizen housing developments near the community services and
transit routes that senior citizens depend upon. As a result, the Planned Neighborhood Design:
Senior Citizen Housing Option Ordinance was developed and adopted by City Council on July 14,
1997. Multiple projects have utilized these provisions including the Luther Village project’s
Phases 1, 2, and 3. This project for Luther Village IV is being developed following the Senior
Citizen Housing Option of the Planned Neighborhood Design.
IV. MASTER PLAN REVIEW DETAILS
Master Plan of Luther Village PND: SCHO Site
This project proposes to develop 33.63 acres +/- with a series of eight (8) apartment buildings
and a two-story town center building for the senior citizen community. This continuation of the
Luther Village PND-SCHO project proposes the construction of apartment buildings as the
housing unit style. Overall, this complex would provide up to 524 dwelling units. The phasing
plan provides the following details for the complex:
Phase 1 2 3 IV 5 6 7 8 9 TOTAL Other Total
Complete Complete Complete (4) SHOWN
Proposed
Number of 68 32 48 72 Town 68 63 63 63 477 47 524
units center Pending
(Apartment
units)
Parking 68 (3) 36 (3) 68 (3) 82 (3) 33 (2) 68 63 63 63 578 Pending 578
Spaces + 34 (3) (3) (3) (3) (26)
(Handicapped parking
Spaces) expansion
Loading 1 1 1 1 0 1 1 1 1 8 ----- 8
Space
Site Layout:
The apartment buildings are arranged in two main areas: four scattered interconnected buildings
(Phases 1-4) and a quad of buildings and the two-story town center building facing a central open
courtyard space (Phases 5-9). A series of sidewalks and walking paths link the buildings of the
site. Several of the future buildings are connected by elevated, enclosed walkways. Currently,
the Phase 1, 2, and 3 Buildings are connected with a first floor passageway. The Phase 3
Apartment Building has a one-story resident Activity Building connecting to the Phase 2
Building. The Phase 4 Building will connect to the Phase 3 Building with a three-story Resident
Amenity Building. A perimeter loop road provides circulation around the complex. A secondary
9
Page 10
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 7 of 18
connector road divides the two main areas of buildings providing direct access to the Town
Center building (Phase 5). Each building phase includes a parking lot area and open space areas
for landscaping. One stormwater management area has been constructed at the northwest corner
of the property. A second management area is to be located in the eastern quad of buildings.
Project Density:
With the Senior Housing Option, the “project density shall be generally compatible with the
development pattern and existing or potential zone densities of the surrounding area.” The
Master Plan for this project shows a site density of 14.2 dwelling units/acre (477 dwelling units
on 33.63 acres). Previously, it was approved for up to 524 dwelling units for a site density of
15.6 dwelling units/acre. Article 3 §24.47 states that “the applicant shall demonstrate to the
satisfaction of the planning commission that the project density proposed is compatible with the
development pattern and density potential of the surrounding area.” The project adjoins
commercial development to the west which includes a grocery store, general merchandise store,
and several restaurants. Surrounding residential areas include single family dwellings in the
Edgehill neighborhood (2.5 dwelling units/acre) and County Village Apartments (15.3 dwelling
units/acre). The adjacent Clearview Meadow subdivision which includes single family, duplex,
and townhouse units proposed a project density of 3.43 dwelling units/acre. The existing Luther
Towers complex on Kings Highway has a site density of 34.2 dwelling units/acre.
Request for PND: Alternative Design Standards
This Plan seeks to continue with adjustments to the required design standards of a Planned
Neighborhood Design: Senior Citizen Housing Option. Article 3 §24.5 of the Zoning Ordinance
permits the Planning Commission to grant such adjustments and reads as follows:
Article 3 §24.5. The design standards and dimensional requirements (bulk and parking
regulations) shall be in accordance with article 4, sections 4.10 and 4.11, except that the planning
commission may relax any of these requirements where the developer can demonstrate that such
action is desirable and consistent with the objectives of this ordinance and the comprehensive
plan.
The following table presents the Design Standards of the Zoning Ordinance for a Planned
Neighborhood Design in comparison to the plan’s design for Alternative Design Standards for
Luther Village. Luther Village is being developed with the conventional housing type of garden
apartments thus Article 3 §24.52i refers to the bulk standards given in Article 4 § 4.11. (Note:
Previously, it appears the project was considered as an assisted living facility under the
provisions of Article 3 §24.52ii. which includes different bulk standards.) The Design
Standards where adjustments are requested are highlighted.
Housing Type Garden Style Apartments
Required Requested
1,800 S.F. per
Average Lot Area 1,800 S.F. per dwelling unit
dwelling unit
1,800 S.F. per
dwelling unit 1,800 S.F. per dwelling unit
Minimum Lot Area
1 acre per 1 acre per building
building
Lot Width 100’ per building 100’ per building
Lot Depth 125’ per building 125’ per building
10
Page 11
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 8 of 18
1 per dwelling unit with extra parking available. See
Off-Street Parking 2
discussion of parking waiver request.
50 feet
Building Setback from
50 feet Not applicable (Applicant seeking wavier to allow
Street
lot without street frontage.)
<50 feet
Building Setback from
Phase IV Apartment Building setbacks vary. They
Property Line
are 32 feet at a side yard and with
Front Yard Setback 50 feet
0 feet at the Amenity Building interconnection
Side Yard Setback
point.
Rear Yard Setback
Building Spacing 50 feet <50 feet (estimated at 45 feet)
Building Height 35 feet Height noted at 43 feet
Number of Stories 2 stories 3 stories
Lot Coverage 60% 60%
Average = 54.5
Average Number of
24 Proposed Complex consists buildings of 32, 48, 63,
Dwelling Units Per Building
68, and 72 units
V. CONDITIONAL USE REVIEW
With Conditional Use Applications, the Planning Commission reviews the proposed project to
determine whether or not the intended use is appropriate in type and scale for the immediate
neighborhood. The Commission must also consider whether or not the proposed use will have an
adverse impact on the future orderly development of the surrounding area. The following
sections of the Zoning Ordinance which relate to the role of the Commission in reviewing
Conditional Use applications are particularly relevant when reviewing this application:
ARTICLE 10. PLANNING COMMISSION
Section 1. - Approval of conditional uses.
On application and after public notice and hearing, the commission may authorize
the issuance by the city planner of permits for any of the conditional uses for which this ordinance
requires, in the district in which such use is proposed to be located. In approving any such use, the
planning commission shall take into consideration the public health, safety and welfare, the comfort and
convenience of the public in general and of the residents of the immediate neighborhood in particular,
and may prescribe appropriate conditions and safeguards as may be required in order that the results of
its action may, to the maximum extent possible, further the expressed intent of this ordinance and the
accomplishment of the following objectives in particular:
1.1 Accessibility for emergency response. That all proposed structures, equipment or
material shall be readily accessible for fire, ambulance, police, and other emergency response;
1.2 Harmony of location, size and character. That the proposed use shall be of such location,
size and character that, in general, it will be in harmony with the appropriate and orderly
development of the zone in which it is proposed to be situated and will not be detrimental to the
orderly development of adjacent properties in accordance with the zoning classification of such
properties;
1.3 Residential zones. That, in addition to the above, in the case of any use located in, or
adjacent to, a residential zone:
1.31 The location and size of such use, the nature and intensity of operations involved
in or conducted in connection therewith, its site layout and its relation to access streets
11
Page 12
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 9 of 18
shall be such that both pedestrian and vehicular traffic to and from the use and the
assembly of persons in connection therewith will not be hazardous or inconvenient to,
or incongruous with, the said residential district or conflict with the normal traffi c of the
neighborhood; and
1.32 The location and height of buildings, the location, nature and height of walls and
fences, the nature and extent of landscaping, and other improvements on the site shall
be such that the use will not hinder or discourage the appropriate development and us e
of adjacent land and buildings.
If the Planning Commission approves a Conditional Use, the use is granted as a Conditional
Use Permit. Such permits may be permanent, subject to limitations outlined in Zoning
Ordinance, Article 10 §1.41, or be required by the Commission to undergo periodic renewal,
using the procedure described in Article 10 §1.42. Any Conditional Use Permit, permanent or
not, may be revoked using the procedure described in Article 10 §1.43 if the conditions
prescribed by the Commission in conjunction with the issuance of the Conditional Use Permit
have not been, or are no longer being complied with.
Approved as Planned Neighborhood Design: Senior Citizen Housing Option project:
The Luther Village project was previously approved in 2002 and 2013 under the Planned
Neighborhood Design Ordinance for the Senior Citizen Housing Option and a Master Plan for
development established (see Zoning Ordinance, Article 3, Section 24.1 (b)); this was
Application C-02-02 and C-13-03. A PND proposal does not involve a rezoning of the land;
remains zoned RG-2 (General Residence Zone). Also, by the Zoning Ordinance provisions, in
the PND: SCHO the units shall be deed restricted to require that the head of household for each
housing unit be at least 55 years of age or older. As part of the PND: SCHO approval process a
series of Alternative Design Standards were established related to the bulk standards addressing
setbacks, spacing, off-street parking, building height, dwelling units per building, etc.
VI. BUILDING ARCHITECTURE
The plan submittal shows the architecture of the Phase IV Apartment Building. (See color
renderings of elevations.) For Phase IV, the Apartment Building is a three-story apartment
building consisting of 72 units. The existing buildings on the site are a three-story building
(Phase 1), a two-story building (Phase 2), and a four-story building (Phase 3). The overall
massing of the brick building is L-shaped with a shingle hipped roof. The building elevations
include projecting elements such as entrance canopies and dormers. The sets of windows are a
combination of fixed and operational windows with the wall box unit for heating/air conditioning
is found just below each window group. The main entrance to the building with gable roofed
canopy is found adjacent to the parking area on the east elevation. The south elevation includes a
glassed projection. The choice of exterior finish materials for the Phase IV building will follow
those utilized in the construction of the other apartment buildings. The Amenity Building is
proposed as a three-story building in a lighter color finish and a gable roof consisting of an open
first floor and enclosed second and third floors to make the connection between the Phase IV to
Phase 3 apartment buildings. The buildings adjacent to the project site include single family
residential dwellings typically one to two stories in height and large-scale commercial buildings.
Emergency Rear Access Requirement for Phase IV Apartment Building
Waiver Request (Withdrawn 10/8/2024)
The Zoning Ordinance requires a 16-foot alley or an 18-foot secondary fire lane to provide
emergency access to the rear of the three-story apartment building in Phase IV (Article 5 Section
12
Page 13
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 10 of 18
17.5(a)). The applicant may request a waiver for elimination of this requirement. The building
has fire protection requirements under the Fire Codes including the following: requiring that the
building be sprinklered, a requirement for primary fire lane for the primary entrance and exit side
of the building, and for fire lane coverage of a percentage of the building.
A written waiver request was submitted for consideration by the Planning Commission; see
Letter from the applicant. The Planning Commission will make a recommendation to the Safety
Advisory and Transportation Committee and City Council who has the final authority to grant
the request for elimination of the rear emergency access for apartments. The rear emergency
access provisions can also be met through a subgrade drivable surface with certain construction
techniques and demarcation by evergreen plantings as described in the Zoning Ordinance.
Note: The Planning Commission deferred action on this Waiver Request at their Meeting of
September 16, 2024 to allow the applicant to discuss the requirements with the Fire
Marshal’s Office. The Applicant chose to withdraw the Waiver Request and will comply with
the Emergency Rear Access Requirement; this was reported to the Planning Commission at
their Meeting of October 21, 2024 and accepted.
VII. PARKING SUMMARY
For Consideration PND Alternative Design Standards: Parking Reduction
For the housing types of apartments, the requirement is based on a rate of two parking spaces per
dwelling unit with 1 parking space per 200 SF of office space and 0.25 parking spaces per
dwelling unit to serve as visitor spaces. For certain types of senior citizen housing facilities, the
Zoning Ordinance, Article 3 §24.52ii notes that parking shall be provided for residents, visitors,
and employees of the facility and that the applicant must demonstrate that the parking provided
is sufficient.
Continuing to seek a parking reduction, the Luther Village PND Master Plan proposes a total 578
parking spaces for the entire complex at build-out. Parking is provided in each Phase with at
least one parking space per apartment dwelling unit. See summary table earlier in this Report.
With the previous Plan approvals, an Alternative Design Standard for parking was approval for a
a rate of one parking space per dwelling unit plus one space per 200 SF of floor area as offices
and one space per 300 SF of meeting room area. A Request detailing the current request for a
Parking Reduction was submitted seeking a ratio of approximately 1.15 spaces per dwelling unit.
Parking Lot Expansion Project C-19-05
The Parking Lot Expansion project in 2019 added a total of 34 parking spaces with several
existing parking spaces in the Phase 3 apartment building parking lot were displaced by the
striping for a dedicated pedestrian path leading to the building.
Bicycle Parking
Waiver Requested: Reduction of Bicycle Parking
The project is required to provide bicycle parking. The bicycle parking calculation is one for
every twenty parking spaces. Based on the total of 578 parking spaces on this parcel, a total of
twenty-nine (29) bicycle parking spaces are required. The Phase IV project area would require
five (5) bicycle parking spaces based on its number of parking spaces in the new parking lot. As
per Zoning Ordinance, Article 6 §3.10 the Planning Commission may consider a waiver request
to reduce the bicycle parking requirement. Previously, the project received approval of a waiver
to reduce the bicycle parking requirement. The written Waiver Request for a reduction in bicycle
13
Page 14
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 11 of 18
parking was submitted for consideration by the Planning Commission; see Letter. The Request
notes that bicycle parking exists for the Phase 3 Building and will be provided with the Phase IV
Building; however, overall it does not meet the bicycle parking rate based on total vehicle
parking spaces in the complex as Buildings 1 and 2 do not have bicycle parking spaces.
VIII. SITE CONSIDERATIONS
Access/Streets
Access to the Luther Village site is provided via Babb Drive from John Hunn Brown Road or
from the street network of the adjacent Clearview Meadow subdivision that also leads to Babb
Drive. The main entrance (with divided median style entry) to the complex is off Babb Drive
with internal site circulation provided by a loop road.
Request for Waiver of Requirement for Two Connections to a Public Street
With the creation of one hundred fifty (150) dwelling units, a second connection to existing
streets must be shown (Land Subdivision Regulations, Article VI §A.8). With Phases 1-3 as
constructed consist of 148 dwelling units and this proposal for Phase IV for 72 new apartment
units would place the total unit count at 220 units. Phase 5A shows this second connection where
in the future at the end of Babb Drive at the intersection with Nob Hill Road, a second access
drive into the Luther Village complex will be constructed. The Plan includes a note listing the
request for Waiver of the Requirement for Two Connections to a Public Street (Sheet CR-01:
General Data, Note #21) and the Request was also made by Letter.
Sidewalks
The locations of sidewalks within the complex are shown. This project will add two sidewalk
segments along the loop road to Phase IV to the sidewalk system along the loop road. There is
also a sidewalk connection leading to the Amenity Building.
Waiver Request: Partial Elimination of Upright Curbing
Article 6 §3.6(b) requires upright curbing for all parking areas. It appears that the continuation of
the loop road expansion does not incorporate curbing. A written waiver request for the elimination
of curbing in these areas was submitted for consideration by the City Planner citing the reasons for
the management of water runoff. The Phase IV Building parking lot area does include curbing.
Dumpster
A Dumpster pad site area appears to be located at the north end of the building. The Dumpster
Rete for an Apartment complex or Apartment Building with over 10 units is that two Dumpsters
are required for the first 48 apartments and one required for each additional 24 apartments or
fraction thereof. Based on the unit count of apartments in Phase IV, three Dumpster units are
required. With the configuration shown on the plan, the applicant is utilizing service by a private
hauler for trash removal services.
IX. TREE PLANTING AND LANDSCAPE PLAN
The Plan shows limited information on the concept for tree planting and landscaping. Canopy
trees line the complex loop road. There are existing trees at the property boundary lines and
other onsite plantings include a mix of canopy trees and evergreen trees with ornamental trees. In
the earlier project phases, trees are planned for the islands within each parking area and along the
front facades of the buildings. Additional planting is composed around specific elements such as
the resident gardens, crochet court, and pavilions. Other than the removal of select trees, the tree
14
Page 15
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 12 of 18
planting proposal for Phase IV is not shown.
Tree plantings are required at rate of one tree per 3,000 SF of development area. The specific
tree counts to meet the tree density requirements will be reviewed for each phase. Also,
evergreen plantings are required to outline the subgrade emergency access (fire lanes) locations
in accordance with Article 5 §17.4d.
X. OPEN SPACE and RECREATION PLAN
The total Common Open Space for the overall Luther Village PND: SCHO project is required at
a rate of 275 square feet per dwelling unit or 0.5 acre of land, whichever is greater. Based on 477
dwelling units shown, at total of 131,175 S.F. of common open space is required for the entire
Luther Village PND: SCHO complex. (Note: For a total 524 dwelling units, 144,100 S.F. of
common open space is required.) A variety of active recreational options are existing or are
proposed for the complex such as a croquet court, walking path, resident gardens, and pavilions.
The Town Center building found in the center of the complex may also provide space for
activities. These recreational components of the Master Plan were previously reviewed and a
recommendation provided by the Parks, Recreation & Community Enhancement Committee to
the Planning Commission. Since no changes were proposed with this resubmission of the Master
Plan, it was determined that review would not be necessary. If future phases of the Master Plan
for the project are redesigned then review for recommendations will be necessary.
Phase 1 construction included the recreational amenities of a walking path, the croquet court, and
garden. Phase 2 construction included a garden area immediately adjacent to the building for use
by the residents. The Phase 3 included an extension of the walking path network further north
along the loop road near the stormwater management pond and a terrace (patio) area near
landscaping adjacent to the building. There are also several gazebos in the complex. A specific
tally of Recreation Area must be provided to ensure that an area of 79,750 SF is provided (to
several Phases 1-IV).
The Active Recreation Area for Phase IV will continue the walking path system, add a larger
gazebo, and provide an Amenity Building. Specific review of the Active Recreation Area plans
for Phase IV by the Parks, Recreation & Community Enhancement Committee is not required at
this time as its Active Recreation Area is already constructed, expands the existing path network,
and includes the same amenities as previous phases.
XI. MINOR SUBDIVISION PLAN FOR PHASE IV
Request for Waivers: Street Frontage Requirement and Building Setbacks and Spacing
This Plan will require review a Minor Subdivision Plan with this Site Plan. It proposes to
subdivide a 2.79-acre parcel from the remaining portion of the 33.63 acres of the overall Luther
Village parcel. Similar parcels were created for Phase 1-3. This subdivision includes the Phase
IV apartment building and the immediately surrounding area.
The proposed parcel must be reviewed for compliance with the bulk standards for items such as
setbacks, lot size, etc. This plan seeks waivers of several bulk standards. As per Zoning
Ordinance, Article 3 §24.5, the Planning Commission may relax the design standards and
dimensional requirements for Planned Neighborhood Design Option project where the developer
can demonstrate that the action is desirable and consistent with the objectives of the ordinance
and the Comprehensive Plan. (See discussion presented earlier in this Report.)
15
Page 16
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 13 of 18
The proposed parcel for Phase IV in within the larger tract of land and therefore will not have
frontage on a public street. The requirement that a parcel have frontage on a public street is
found in the Land Subdivision Regulations, Article VI §E.5. The provisions for waivers are also
found in the Land Subdivision Regulations in Article VIIA.
A. Variance and Waiver.
1. Upon the findings of the commission that, due to special conditions peculiar to a
subdivision or a site, certain requirements of these regulations are inappropriate, or that
strict compliance with said requirements may cause extraordinary and unnecessary
hardships, the commission may recommend to city council, and city council may vary or
waive said requirements; provided that such variance or waiver shall not be detrimental
to the public health, safety, or general welfare, or have the effect of nullifying the intent
and purpose of the official map, the zoning ordinance, the development plan or these
regulations. In varying or waiving certain requirements, the council may specify such
conditions as will, in its judgment, secure substantially the objectives of the requirements
so varied or waived.
The Planning Commission should forward a formal recommendation to the associated City
Council Committee and City Council with regard to the requested subdivision waiver regarding
the street frontage. The City Council has the final approval regarding this subdivision waiver.
Similar waiver requests were granted for the Luther Village PND: SCHO Phase 1, Phase 2, and
Phase 3 to allow each building to exist on a smaller parcel area to meet grant funding
requirements and/or ownership requirements. A written waiver request was submitted seeking a
waiver of the requirement for the parcel (for Phase IV) to have frontage on a public street.
XII. CITY AND STATE CODE REQUIREMENTS: UPDATE
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with this agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) The Planning Commission must determine the appropriateness of the proposed density
for the PND-SCHO project site as part of their review process.
2) The project must comply with the bulk standards for apartments in the PND unless
seeking waivers for Alternative Design Standards for the PND: SCHO. A written request
was received and Planning Commission must grant approval for the following:
a. Building Setbacks from the Property Line;
b. Building Spacing;
c. Building Height;
d. Number of stories; and
e. Average Number of Dwelling Units Per Building.
3) The project must comply with the requirements for the emergency rear access provisions
for the apartment units unless a waiver is granted. Significant redesign of the
development project will be required if this waiver is not granted. A written waiver
request was submitted seeking the elimination of the emergency rear access for
consideration by the Planning Commission. The Planning Commission will make a
recommendation on it. Note: This Waiver Request was withdrawn on October 8, 2024
and the plan will be revised to show compliance.
16
Page 17
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 14 of 18
4) The project must comply with the requirements for the parking requirements unless a
waiver is granted. A written waiver request was submitted for the reduction in parking for
consideration by the Planning Commission
5) Upright curbing shall be provided in accordance with the Zoning Ordinance unless a
waiver is granted by the Planning Commission. A written waiver request was submitted
for the elimination of a portion of the curbing for consideration by the City Planner.
6) The bicycle parking space requirement must be met for the site. A written waiver request
was submitted for consideration by the Planning Commission.
7) The outcome of the waiver requests must be noted on the Final Site Plan and the Minor
Subdivision Plan. If the waiver requests associated with the Minor Subdivision are
approved, a plan for recordation must be approved and recorded prior to final Site Plan
approval.
8) Provide a copy of the Deed Restrictions as required in the Zoning Ordinance, Article 3
§24.8vii. or acceptable documentation of policies regarding operations.
9) The data column on all sheets (including on a future Record Plan sheet) needs to be
updated prior to Final Approval with any changes recommended by the Planning
Commission.
a. List all parcels of the complex; one is missing.
b. In Item #3, list each phase by parcel with owner.
c. List zoning as RG-2 (General Residence Zone).
d. Update the bulk standards by listing standards for PND garden apartment as found
in Article 4 §4.11. Also note where Alternative Standards are sought/approved.
e. Add density calculation for project and note action taken by the Planning
Commission.
f. Update outcome of action on waivers.
g. Add data specific to Phase IV such as lot size, building footprint, total building
floor area, setbacks, etc.
h. Item #16, list parking data for each Phase and overall.
i. Item #23, this property is not located within the AEOZ (Airport Environs Overlay
Zone). Clarify if this note is required by other agencies.
j. Add tallies of Active Recreation Areas as existing, proposed, and overall.
10) Sheet CR-02 to CR-05:
a. Setbacks: As a PND-SCHO a series of Alternative Design Standards were
previously authorized and are being considered again. Show the distances from
the proposed Phase IV building to the property lines.
b. Ensure existing Stormwater management Area is current on any maintenance
requirements.
c. Clarify design format of Dumpster enclosure.
d. Clarify tree removals as certain trees marked for removal do not appear to conflict
with development activities.
e. Ensure Electric Vehicle charging station set-up does not impede future sidewalk
continuation. 17
Page 18
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 15 of 18
11) Identify the location and number of bicycle parking spaces to meet the bicycle parking
requirement based on total number of parking spaces in Phase IV. Also show location of
existing bike racks.
12) Provide construction details sheet for Phase IV items including the following items but
not limited to barrier free sidewalk, dumpster enclosures, dumpster pad, curbing, parking
bumpers, traffic control signage, crosswalks, paving section, lighting fixtures, handicap
signage, walking path, etc.
13) Ensure barrier free access is provided at all intersections of drive lanes and sidewalks.
Add ramps at crossings of loop road and use piano key style crosswalks.
14) Landscape Plan must be submitted for review of Phase IV Site Plan.
a. Identify existing trees in Phases 1-3.
b. Clarify the tree planting calculations for Phases 1-3 and Phase IV. As there may
be other existing trees available to satisfy the tree planting requirement. Or you
may identify a development area for calculation of the tree planting requirement.
c. Depict development area and its existing tree status,
d. Show tree plantings proposes for Phase IV.
e. Clarify if existing trees removed in the vicinity of Phase 3 will be replanted.
15) Provide an Active Recreation Plan or information to clarify the existing and proposed
Active Recreation area calculations and proposed areas to be constructed in Phase IV.
a. Provide area calculation for the recreation area required for units.
b. The area of the wet stormwater management pond cannot be counted towards
active recreation area.
16) Provide Record Subdivision Plan sheet to depict the Phase IV subdivision and any
additional easements to allow for cross-access, use of recreation areas, stormwater
management, utilities, etc.
XIII. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES
In accordance with the Zoning Ordinance, Article 10 §1, the Planning Commission in
considering and acting upon Conditional Use Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 1.1 to 1.3.
1) Waiver Requests:
a) Alternative Design Standards for PND: SCHO: Planning Staff recommends approval of
the series of Alternative Design Standards for the PND: SCHO. It is noted that these
Alternative Design Standards were previously approved. The following findings
regarding these Design Standards are noted.
i) The reduction in the building setbacks from property lines under the provisions of the
18
Page 19
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 16 of 18
Planned Neighborhood Design Option is necessitated due to the creation of a parcel
specifically for Phase IV. Overall, when compared to the greater boundary of the
Luther Village complex, the building placement complies with the setbacks
requirements.
ii) The building spacing is reduced to accommodate enclosed connections between
buildings; however, the buildings will still be required to meet the requirements of the
Building Codes and Fire Codes.
iii) The increase in building height, number of stories, and average number of units per
building continues to fit the character of the area as the location is interior to the
Luther Village complex and the units can be accommodated in a smaller building
footprint by adding floors. The density proposed is appropriate as this development is
infill within an area with existing infrastructure and amenities.
b) Reduction in Parking: Planning Staff recommends approval for the reduction in number
of parking spaces to a minimum rate of one parking space per dwelling unit with
additional parking spaces provided to accommodate any office space or meeting rooms in
the building. The applicant’s request for a rate of 1.15 parking spaces per dwelling unit is
acceptable.
c) Reduction in Bicycle Parking: Planning Staff recommends approval for a reduction in the
overall number of bicycle parking spaces based on the demographics of the apartment
tenants. It is noted that Buildings in Phase 3 and Phase IV have bicycle rates. The
applicant has given consideration to providing bicycle parking spaces at each building to
serve staff, visitors, and residents. The applicant may also want to consider covered
storage or interior storage opportunities for bicycles owned by residents.
d) Partial Elimination of Curbing: Planning Staff grants approval of the request to eliminate
the curbing for the loop road for areas necessary for stormwater management.
e) Elimination of Emergency Rear Access for Apartments: Planning Staff recommends the
applicant continue evaluation of options to avoid the elimination the emergency rear
access for the Phase IV apartment building. There may be alternatives or other options to
meet this rear access requirement such as extension of existing/proposed access drives,
enhanced walking paths, or creation of subgrade improvements to make a drivable
surface. It appears that the Phase IV building will be sprinklered and will include other
required fire lane coverage. Planning Staff recommends additional discussions with the
City’s Office of the Fire Marshal. Note: This Waiver Request was withdrawn on October
8, 2024 and the plan will be revised to show compliance.
f) Requirement for Two Connections to a Public Street: Planning Staff recommends
approval for the elimination of the second connection to public street requirement for
Phase IV only. Given the phasing of the apartment complex construction, the current
divided median entry does provide an option for access (in an emergency). The second
connection to Babb Drive is planned as part of the Phase 5(A) and should be completed
before the addition of apartment buildings in the eastern area of the complex.
g) Street Frontage for Parcel: Staff recommends approval of the waiver to allow for
creation of a parcel without street frontage noting that the main parcel of the complex
19
Page 20
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 17 of 18
including the entrance maintains frontage along a public street. The creation of this parcel
focused on Phase IV is necessary to comply with funding and/or ownership requirements
for the project. Similar waivers were approved for Phase 1, Phase 2, and Phase 3.
XIV. ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the waiver requests as part of any motion to
approve this Conditional Use Site Plan/Master Plan, or as a separate motion if necessary.
Note: The recommendation for this waiver is at the discretion of the Planning Commission.
The Commission may approve or deny waiver requests.
2) The Planning Commission should provide recommendations to City Council in regard to the
Subdivision Waivers of the Land Subdivision Regulations. The City Council and associated
Committee meeting will be scheduled to review this request.
3) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
4) A Minor Subdivision Record Plat shall be prepared for recordation to subdivide the parcel
into the Phase IV parcel identified. All easements shall be fully described on the Plat. The
Minor Subdivision Plat shall be approved and signed by the City Planner prior recordation in
the Kent County Recorder of Deeds Office.
5) In the event, that major changes and revisions to the Plan occur in the finalization of the Site
Plan contact the Department of Planning and Inspections. These changes may require
resubmittal for review by the Development Advisory Committee, Planning Commission, or
other commissions making recommendations in regard to the plan.
6) Construction may have an effect on the adjacent buildings on the site and site access. Any
work requiring the closing or rerouting of residents or visitors to the adjacent buildings, and
site access shall be coordinated as to offer the least amount of inconvenience.
7) The applicant/developer shall be aware that prior to any ground disturbing activities on the
site the appropriate site inspections and permits are required.
8) The applicant shall be aware that Plan approval does not represent a Building Permit, and
associated construction activity permits A separate application process is required for
issuance of a Building Permit from the City of Dover.
9) The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it
convey permission to place any sign on the premises. Certain types of signage require a Sign
Permit from the City of Dover prior to placement of any such sign; please consult with
Planning Staff in regard to signage.
Findings and Recommendations of the Dover Planning Commission
At the Planning Commission Meetings (In-Person and Virtual) on September 16, 2024, the
Planning Commission reviewed the proposed Waiver Requests as part of its review of the
Conditional Use Site Plan/Master Plan C-24-02 Luther Village IV: Planned Neighborhood Design
20
Page 21
Item 1.
C-24-02 Luther Village IV: Planned Neighborhood Design: Senior Citizen Housing Option
Planning Commission Recommendation Report of September 16, 2024 and DAC Report of September 4, 2024
Page 18 of 18
– Senior Citizen Housing Option. The Application (C-24-02) was represented by Mr. Craig Lynch
for the applicant’s engineering firm Landmark Engineering & Science and Mr. Richard Murphy,
President of the Board for the Martin Luther Foundation of Dover. During the Public Hearing, one
member of the public spoke on the application and there were no written comments received.
Following a Public Hearing and further consideration, the Planning Commission granted
conditional approval of the Conditional Use Site Plan/Master Plan with approval of the
Alternative Design Standards for the PND; approval of Waiver Requests for Partial Elimination of
Upright Curbing and Reduction of Bicycle Parking; and including recommendations of approval of
the Subdivision Waivers allowing for one connection to the Public Street and allowing creation
of a lot without frontage on a Public Street. The motion passed 8-0 (one member absent). See
also the attached excerpts of the Meeting Minutes of the September 16, 2024 Planning Commission
meeting for this application.
Attachments:
• Development Advisory Committee Comments: Comments from City of Dover Public
Works Department, Department of Water & Wastewater, Electric Department, City
Office of the Fire Marshal, DelDOT, Kent Conservation District, Dover/Kent County
MPO, and Chesapeake Utilities
• Subdivision Waiver Request Letter 2 dated September 4, 2024
• Conditional Use Site Plan/ Master Plan Sheets (Sheets CR-01 to CR-05)
• Updated Site Plan Sheet (CF-01) showing Rear Emergency Access (Subgrade access lane)
• Excerpt of Planning Commission Meeting Minutes of September 16, 2024
Note: The Application materials also include the following items which are on file at the
Planning Office: Complete Plan Set with Utility Plan and Fire Marshal Plan; Building
Architecture; Waiver Request Letter 1 dated September 4, 2024; Letter of Waiver Request
Withdrawal dated October 8, 2024; and Application Forms.
21
Page 22
Item 1.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: AUGUST 28, 2024
APPLICATION: Luther Village IV: Planned Neighborhood Design – Senior
Citizen Housing Option on Babb Drive
FILE #: C-24-02
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT EMAIL: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate
capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall
provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling
containers.
2. Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
3. Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
2. Please add the following notes to the plans:
a. Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be
installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the
standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free
pedestrian movement and site access.
22
Page 23
Item 1.
Luther Village IV: Planned Neighborhood Design – Senior Citizen Housing Option on Babb Drive
File #: C-24-02
August 28, 2024
Page 2 of 4
b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the
ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid
by order of the city council, until it is taken up and relaid.
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010.
Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance
with the City of Dover Department of Water & Wastewater specifications and requirements.
c. The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736-
7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must
observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field
due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe
joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the
contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring
adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that
effective May 1, 2022, water mains can now be constructed using DR 18 PVC.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of
the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be submitted prior to
approval so the meter size can be placed on the final site plan. The proposed water meters must be installed in a pit per City of
Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the
tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at
the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be
tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should
be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of
the building. A blow up detail of this layout is recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The Department
of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used
for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of
the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A
pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90°) bend and thrust block. All
rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe.
Confirm particulars to meet this requirement with mechanical designer.
7. Water services shall be either type K copper or SDR-9.
8. On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain
backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific
description of the activities in the building.
9. All water infrastructure on the property will be owned and maintained by the property owner.
23
Page 24
Item 1.
Luther Village IV: Planned Neighborhood Design – Senior Citizen Housing Option on Babb Drive
File #: C-24-02
August 28, 2024
Page 3 of 4
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause
to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage,
uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include
condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water,
surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner
and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the
site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert
elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way
and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and
cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance
requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be
provided on the plan.
8. All wastewater infrastructure on the property will be owned and maintained by the property owner.
9. Depending on the effluent flow, the downstream pump station must be evaluated by the developer / engineer to verify it can
handle the additional effluent flow.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must
be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
24
Page 25
Item 1.
Luther Village IV: Planned Neighborhood Design – Senior Citizen Housing Option on Babb Drive
File #: C-24-02
August 28, 2024
Page 4 of 4
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and
providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for
review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of
Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until
review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water &
Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
4. Water impact fees will be required to be paid prior to Certificate of Occupancy for this project.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending
and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources,
Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees,
completed forms and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer
crossings must be shown on the profiles.
4. Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist,
which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
SANITATION / STORMWATER / STREETS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
25
Page 26
Item 1.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: AUG 28, 2024
APPLICATION: Luther Village IV: Planned Neighborhood Design – Senior
Citizen Housing Option on Babb Drive
FILE #: C-24-02
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Operations Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Any relocation or upgrade of existing electrical equipment will be engineered by the City of Dover Electric
Department. Developer may be required to perform a quantity of the relocation. Any work performed by the City of
Dover will be at the owner’s expense.
2. Owner is responsible for locating all existing underground facilities to include electric, water and gas.
3. Owner is responsible for site and/or street lighting.
4. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
5. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
6. All Engineering and design for Dover Electric will be engineered upon receipt of final approved plans. All Engineering
work will be furnished by the City’s Electric Engineering Department.
GENERAL
1. Final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format) and Adobe Reader
(.pdf format), if applicable.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
26
Page 27
Item 1.
Luther Village IV: Planned Neighborhood Design-Senior Citizen Housing Option on Babb Drive
File #: C-24-02
Aug 28, 2024
Page 2 of 2
ADVISORY COMMENTS TO THE APPLICANT
1. Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates.
Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
2. The City of Dover Electric Department is responsible for electricity up to the primary metering cabinet (4M3) located
at the entrance to Luther Village on Babb Drive. Luther Village is responsible for the electric past this meter. All other
comments on this form should be used as reference only in the event of future changes.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
27
Page 28
C F
C-24-02 I IItem 1.
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: August 28, 2024 REVISED D S
O H
V A
E L
APPLICATION: Luther Village IV Babb Dr
R
FILE #: C-24-02 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is residential (apartments)
2. Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the
width of the door(s) or for 10 feet, whichever is greater.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 75% and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of
two or more stories, measured from the face of the building at grade with a maximum slope of ten
percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be
permitted within the perimeter access, and shall not interfere with emergency services fire ground
operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall
for building of two or more stories.
28
Page 29
Item 1.
5. Fire lanes shall cover 35% of the proposed building.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the
primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served
by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the
closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two
stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located closer
than 15 feet to the exterior wall.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
Where parking is located between the building and the perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall
for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5,
3.5.2
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and
face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow
demarcation line shall mark the edge(s) of the fire lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot
intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than
eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall
face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu
of fire lane signs and shall conform to the specifications of 7.6.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over any
fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be
provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or
any other building features shall not apply towards the fire lane accessibility requirements of Section
4.0, Table 5-1 in this chapter.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. Emergency access to rear building areas compliant with City of Dover Code (Appendix B-Zoning,
Article 5- Supplementary Regulations, Section 17);
all four stories and greater buildings require 24ft fire lane at the rear.
All two to three story apartment structures require an 18ft Secondary Fire Lane at the rear.
29
Page 30
Item 1.
All townhouses (3-8 units with no fire protection) require a 16ft alley or 18ft secondary fire lane at
the rear.
12. Multiple Access Roads shall be provided when a fire department access road (fire lane) is determined
by the Fire Marshal to be impaired by vehicle congestion, condition of terrain, climatic conditions, or
other factors that could limit access such as placement of fire hose from fire equipment.
13. Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article VII,
Section A. 13,
Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides
Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides
Alley
12 feet wide
14. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-sac as
outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
15. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
16. Gated Areas: Fire Department access shall be provided to the property through the use of a system or
device approved by the Fire Marshal. The system or device required shall be located in an area
accessible to the fire department and approved by the Fire Marshal. All gates shall be either
automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The
owner or their representative shall meet with the Fire Marshal prior to submission to agree on the
system. A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their representative
shall meet with the Fire Marshal prior to submission to agree on the means to open. A letter of
agreement shall be created and signed by both parties. The letter shall include a detailed description
of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not less
than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be
setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
30
Page 31
Item 1.
17. Fire hydrants shall be installed per the requirements of City of Dover Public Utilities
Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention
Regulations. City Ordinance Sec 46-9 (f).
5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall
be located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All
hydrant spacing shall be located along available roads or at the direction of the State Fire Marshal.
This measurement shall be calculated by way of accessible thoroughfare(s) from the building to be
protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional hydrants shall be
provided when the State Fire Marshal deems it necessary based on the configuration of the site,
building(s), exposures, construction, occupancy, and/or specific hazard(s).
Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached
dwellings, other residential, rowhouses and townhouses, assembly, health care, business,
education, storage, industrial, mercantile, and mini storage. (702, Chapter 6)
NFPA 1
18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and
two-family dwellings in accordance with both of the following: 1. the maximum distance to a fire
hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum distance
between fire hydrants shall not exceed 800 feet.
18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided
for buildings other than detached one- and two-family dwellings in accordance with both of the
following 1. The maximum distance to a fire hydrant from the closet point on the building shall not
exceed 400 feet 2. The maximum distance between fire hydrants shall not exceed 500 feet
18. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and
as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation
lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the
fire hydrant and extend for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards
filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant
demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of
the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be
facing the edge of the street, or traffic lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
19. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under
the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500
GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM -
painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black.
(2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
31
Page 32
Item 1.
20. Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and-
hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
21. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an occupancy
determined to be a place of assembly by the fire marshal and is capable of receiving an occupant load
of 75 persons or greater, shall be required to install a fire alarm in accordance with NFPA codes
governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to be
a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the
assessed value of the building and is capable of receiving an occupant load 75 persons or greater or is
being enlarged to receive an occupant load of 75 persons or greater, shall be required to install a
complete fire alarm system in accordance with NFPA codes governing the installation of fire alarms
and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration o f at least
60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required to be
served by the system using the A-weighted scale dBA. In the event the stated requirement cannot be
met a shunt trip relay/switches shall be the approved method of meeting the intent of this section of
the Code.
(City Code of Ordinances 46-171)
22. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions
which are modified by more than 50% after the effective date of these Regulations. The 50%
figure shall be calculated utilizing the gross square footage of the building, structure, marine
vessel, premises and conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and
approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of
the gross square footage of a non-sprinklered building, may not have another such project for the
same building submitted for review and approval any sooner than three (3) years after the date of
the final inspection unless sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling,
manufacturing, processing, display or sale of combustible goods, wares, merchandise, products,
or materials when more than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and
exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment
buildings storage areas except individual unit closets that are located within individual
residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA
101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high
32
Page 33
Item 1.
hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the
Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or
private school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies
to all such dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently
adopted edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an
occupant load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create
an occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be
sprinklered throughout in accordance with the most recently adopted edition of NFPA 13
when the following apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where
alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an
occupant load greater than 100 persons and where alcohol will be served for consumption on
the premises.
Any additions or increase in interior size to an existing place of assembly which would create
an occupant load of 100 persons or greater and where alcohol will be served for consumption
on the premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout
in accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by an
approved, supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1. Dance Halls
2. Discotheques 3. Nightclubs 4. Bars 5. Restaurants 6. Assembly occupancies with festival
seating
23. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow
located within 50 feet of main entrance. Access to the Fire Department Connection must be
clear unobstructed access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five -
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire
33
Page 34
Item 1.
Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department
connections shall be not less than three feet nor more than five feet in height above finished grade.
The fire marshal shall have the authority to require more stringent requirements when deemed
necessary. (City of Dover Code of Ordinances 46-162)
24. Parking and/or obstructions shall be prohibited in front of fire department connections for a
distance measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
25. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would
come off the fire equipment.
26. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation
lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of
the connection and extend for a distance of four feet (4') on both sides, and where parking is allow
between the building and the street or fire lane the solid yellow demarcation lines shall extend from
the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the
sidewalk surface). All fire department connections (standpipe and sprinkler) shall have a minimum
12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches
(3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly
visible from the fire lane or roadway, and signs using NFPA international symbols shall be an
acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
27. Standpipes shall be provided in all areas and buildings as required in the codes and standards listed
in Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet
in height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and
standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall
be installed in accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use as
each floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At
the highest intermediate landing between floor levels in every required exit stairway,
Where intermediate landing is not provided, hose connections shall be permitted to be located at the
main floor landings in exit stairways when approved by the authority having jurisdiction,
34
Page 35
Item 1.
Where the local fire department has the capability of providing the required pressure, hydraulically
designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide
the required waterflow rate.
A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021
Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
28. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and
valves located inside structures shall have impact protection, except when located in separate
protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at
a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in
height above the finish grade elevation. Any deviation of the stated requirements must be approved
by the fire marshal and/or chief building inspector. The above dimensions shall serve as the
requirement for installation; however, the fire marshal and/or chief building inspector shall have the
authority to require more stringent dimensions to fit the needs of devices warranting impact
protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be
of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved
by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
29. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley, shall
have displayed on that wall, in legible, easily read characters which are of contrasting color to the
background, the proper street number for such house, building, or structure in accordance with the
following:
One-family and two-family residential structures, height, the number shall measure a minimum of four inches
in height, location, the number shall be placed on the house above or to the left or right of the front
entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers
shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings with
apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location, numbers
shall be placed either in the center of the building or on the street end of the building so as to be
visible from either the public or private street or from the parking lot, color, numbers shall be
contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the street
end of the building so as to be visible from either the public or private street or from the parking lot,
property line or driveway, should the building be located far enough from a public or private road so that
the numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building,
35
Page 36
Item 1.
color; each building, numbers shall be contrasting to the background color and shall be placed on each
building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number
affixed to the front of the tenant space and on the outside of the rear door which corresponds with
that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
30. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system that
is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any
new or existing building where a fire alarm or sprinkler system is being installed. It shall
be the responsibility of the owner or occupant to keep a set of keys in the secured key
box that are current to the locks of the protected occupancy. Buildings with 24-hour
staffing or guard service shall be exempt from this subsection.
Location. The secured key system shall be located as close to the main entrance as
possible. Should the building design not allow the secured key system to be located by
the main entrance, the fire marshal and fire chief shall come to an agreement as to an
alternate location for the key box. A secured key system, once installed, shall not be
obstructed from view or obstructed by any means that would delay the fire department
access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress
or egress, whether on the interior or exterior of the building, and keys to locked
mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls
and any area protected by automatic fire detection. Keys to individual residential
apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the
key box for new buildings. It shall be the responsibility of the owner or tenant to order
the key box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be
conducted before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
31. All required means of egress shall have an exit discharge consisting of a non-slip surface and leading
to and terminating at a public way. NFPA 101
32. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where
36
Page 37
Item 1.
two or more new passenger elevators are located in a single hoist way and serve all or the same
portion of the building, only one elevator car that provides a car sized to accommodate an ambulance
cot 24 inches by 84 inches in its horizontal position for each hoist way shall be required. Elevator
cars required to comply with 15.1 or 15.2 shall be identified by the international symbol for emergency
medical services (star of life). The symbol shall be not less than 3 inches (76 mm) in height and shall
be placed inside on both sides of the hoist way door frame. Firefighter recall keys shall be provided in
a manner acceptable to the local fire department. (2021 Delaware State Fire Prevention Regulations
705, Chapter 1, 15)
33. Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This must
be scheduled in advance with an authorized vendor.
34. Project to be completed per approved Site Plan.
35. Full building and fire plan review is required.
36. Separate building permits/plans submission will be required for each building and/or tenant fit out. If
the permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans
and permits submissions will be required for each “tenant fit out” at which time a Certificate of
Occupancy will be issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the
“shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.
37. Construction or renovations cannot be started until building plans are approved.
38. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems
require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is
approved.
39. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
40. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
No building or structure in any district shall be erected or structurally altered without a building permit duly
issued upon application to the building inspector. No building permit shall be issued unless the proposed
construction or use is in full conformity with all the provisions of this ordinance. Any building permit issued
in violation of the provisions of this ordinance shall be null and void and of no effect, without the necessity
for any proceedings for revocations or nullification thereof, and any work undertaken or use established
pursuant to any such permit shall be unlawful (see section 4 for penalties).
1.1 No building permit shall be issued for the construction or alteration of any building upon a lot
without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the
planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of such
building is subject to approval by the planning commission, except upon approval of such plans
approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has
been approved by the planning commission.
1.3 No building permit shall be issued for a building to be used for any conditional use in any zone
where such use is allowed only with approval of the planning commission, unless and until such
approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3)
37
Page 38
Item 1.
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Please confirm that the distance between the building and parking is 15’ as outlined in
item # 6 listed above
2. Please show the secondary fire lane as outlined in item # 11 listed above
3. Buildings 1 through 3 have a subgrade emergency access lane that is no longer properly
marked. These Fire Lanes need to be properly marked (listed below). Please arrange a
meeting with this office to review those lanes. These lanes need to be in compliance as
part of this approval.
4. Additional hydrants are needed as outlined in item # 17 listed above. They must not
exceed 800’. One must be located within 300’ of the FDC as hose would come off of the
apparatus. They must be on the backside of the building as well.
5. It appears that phase 5 building doesn’t have proper access
6. This office does not support the emergency rear access waiver. This item is listed above as
item # 11. This ordinance was put into place due to access issues for the fire department at
apartment complexes. During an emergency event, the fire department would have trouble
accessing the rear of the proposed building properly. This would hinder firefighting and
rescue operations.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
(4) Subgrade emergency access lanes.
(a) A subgrade emergency access lane is designed to provide emergency vehicle accessibility
in lieu of paved, hard-surfaced fire lanes where permitted under subsection 5 [(5)](a) of this
section. A subgrade emergency access lane shall not be substituted for a required secondary
fire lane.
(b) All subgrade emergency access lanes shall be established at a minimum width of 18 feet
and shall be set back from all building walls in accordance with the Delaware State Fire
Protection Regulations. The planning commission may waive the 18-foot width requirement
when demarcation is enhanced beyond the standards set forth in paragraph [subsection
(4)](d) below.
38
Page 39
Item 1.
(c) All subgrade emergency access lanes shall be constructed on a level subgrade compacted
to at least 2,000 pounds per square foot. The compacted subgrade shall be overlaid with
three to four inches of compacted crusher run (CR1-2.5″) underneath four inches of
compacted crusher run (CR6-1.5″) to form a compacted subbase. The compacted subbase
shall be covered with at least four inches of topsoil and shall be graded and seeded or
sodded. (See figure 17.1.)
(d) All subgrade emergency access lanes shall be designated and identified by shrub
plantings, fencing, signage or any combination of materials to adequately delineate such
access way, subject to approval by the City of Dover Fire Marshal. When shrub plantings are
to be used for lane demarcation, such plantings shall be evergreen and of a columnar,
upright form, with [a] tight branching habit. Shrub planting selection shall be subject to final
approval by the city planner. Demarcation shrub plantings shall be spaced no greater than 40
feet on center on straight sections of access lane and no greater than 20 feet on center on
curved sections.
(e) All subgrade emergency access lanes shall be maintained free of obstruction. The
placement of fences, buildings, landscaping, gardens, play equipment or any other form of
obstruction shall be prohibited from placement within the boundaries of subgrade
emergency access lanes. The area reserved for [an] emergency access lane shall be subject to
all property maintenance ordinances of the City of Dover, including those governing grass
cutting, and landscape maintenance. Violations are punishable as misdemeanor offenses
under the applicable ordinances of the City of Dover.
(f) At points of access to subgrade emergency access lanes, there shall be provided an
adequate curb depression of at least 24 feet in width. Such access points shall be designated
as restricted use and controlled by signage, pavement marking, gates or fencing to prevent
the use of such lane for purposes other than emergency vehicle access. The methods
employed to ensure controlled access shall be reviewed, approved and inspected by the fire
marshal on a case by case basis prior to the issuance of a certificate of occupancy for
associated buildings.
39
Page 40
Item 1.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: Luther Village IV – Senior Citizen Housing Option
FILE#: C-24-02 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Brian Williams PHONE#: 302-760-2141
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. Pre-submittal meeting required.
40
Page 41
Item 1.
KENT CONSERVATION DISTRICT
1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
AUGUST 2024
APPLICATION: Luther Village IV: Planned Neighborhood Design – Senior Citizen Housing Option on
Babb Drive
FILE #: C-24-02
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Cullen Baker
PHONE: (302) 608 – 5370
EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY
AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS
ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. A pre-application meeting will be required to be scheduled with KCD to discuss requirements for plan
approval.
ADVISORY COMMENTS TO THE APPLICANT:
1. The proposed plan will need to show that Luther Village Phase 4 stormwater will drain into the existing
stormwater facilities. If any portion of Phase 4 cannot then other stormwater facilities will need to be
constructed in Phase 4.
41
Page 42
Item 1.
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
APPLICATION REVIEW COMMENTARY Planning
D.A.C. MEETING DATE: 9/4/2024 Organization
C-24-02 Luther Village IV: Planned Neighborhood Design - Senior Citizen Housing Option on
Babb Drive
FILE # C-24-02 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030
Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or
eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be
waived.
City of Dover Planning Commission
Conditional Use Site Plan Review
C-24-02 Luther Village IV: Planned Neighborhood Design - Senior Citizen Housing Option
on Babb Drive
The MPO has no objections to the Conditional Use Site Plan. The path system that will run
between buildings is likely to promote active recreation and provide a safe means of walking
throughout the property. It will also connect to the existing DART bus stop on Babb Drive.
Walkable neighborhoods are especially important for older communities, where many of the
residents may not drive a personal vehicle.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
42
Page 43
Item 1.
September 4, 2024 C 1243-7
Planning Commission
City of Dover, Delaware
15 Loockerman Plaza
Dover, DE 19901
SUBJECT: LUTHER VILLAGE, WAIVER REQUESTS
DOVER, DELAWARE
To Whom It May Concern:
I am writing to formally request waivers from specific requirements outlined in Appendix A,
“Subdivisions,” of the Dover Code of Ordinances for C-24-02 Luther Village Phase IV. We
believe that granting these waivers will facilitate the successful development of the project while
maintaining conformity with the overall objectives of the PND-SCHO Master Plan.
Curb Installation Requirement:
In accordance with Article VII §A.2., we are requesting a waiver from the requirement of Article
VI §G.1.C requiring curb along major subdivisions. In keeping with the existing conditions, we
are proposing grass up to the edge of pavement to facilitate drainage and stormwater
management on the access road (Bunnell Way).
Two Connections to a Public Street:
In accordance of Article VII §A.1, we are requesting a waiver from Article VI, §A.8(b), requiring
a second connection to a State or City maintained street if a development contains 150 or more
dwelling units. Currently, three (3) phases of the previously approved Planned Neighborhood
Development have been constructed, with 148 dwelling units currently available. Phase IV
proposes an additional 72 units. The previously approved connection, Phase V A, creates a closed
loop whereby no functional relief is attained through traffic using the new entrance until Phase V
is constructed. The second connection will have an immense benefit for Phases V through IX,
serving an additional spur road to those phases.
43
Page 44
Item 1.
C 1243-7
Planning Commission
September 4, 2024
Page Two
Street Frontage for Parcel:
In accordance with Article VII §A.1, we are requesting a waiver from the requirement of Article
VI §E.5. requiring all lots in a subdivision to have frontage on a public street. We are proposing
the creation of a parcel without street frontage noting that the residual development including the
entrance maintains frontage along a public street. The creation of this parcel, focused on Phase
IV, is necessary to facilitate grant funding and ownership requirements relating to maintenance.
Similar waivers were approved for Phase I through Phase III.
Reduction in Bicycle Parking:
In accordance with Article VII §A.1, we are requesting a waiver for the requirement of Appendix
B Article 6 §3.10. requiring one bicycle parking space for every 20 vehicular parking spaces.
There are currently 6 spaces on site serving Phase III that are, due in part to the demographics of
the tenants, underutilized. Only 2 residents currently use the bike racks. There are an additional 6
bicycle spaces proposed by this plan, satisfying the requirements of Phase IV, however, Phases I
and II do not have any bicycle parking as it was not a code requirement at the time of plan
approval for those phases. Depending on the status of grant funding availability, bicycle spaces
may be contemplated in phases I and II in the future.
We trust that you find these requests reasonable and aligned with the overall goals of the code.
We are confident that the proposed modifications will enhance the project’s effectiveness and
contribute positively to the community. We appreciate your time and consideration in reviewing
our waiver requests and look forward to your favorable response.
Very truly yours,
Craig M. Lynch, P.E.
Project Engineer
cc: Rick Murphy, Martin Luther Foundation of Dover
44
P:\C1243 LUTHER VILLAGE\C1243-7 Record and Construction Plans\Correspondence\Letters\2024-09-04(CMLltr_DoverPC)C1243-7.docx
Page 45
Item 1.
SITE PLAN
DE STATE PLAN NAD 83/91
FOR S.
D
S TRE
ET
UP
T AN
ON E RM
LUTHER VILLAGE IV
HI OCK
W
E.
LO SITE
GH
(
AY
13)
NN
HU D.
HN N R
JO OW
BR
BABB DRIVE
CITY OF DOVER - EAST DOVER HUNDRED - KENT COUNTY - DELAWARE LITTLE CREEK
13) ROAD
AY (
GENERAL DATA: B
S.
T HI AY
1. TAX PARCEL NUMBERS: 05-77.06-02-90.00, 05-77.06-02-90.01, 05-77.06-02-90.02 GHW
RO
AD
2. SOURCE OF TITLE: INSTRUMENT 2014-254106 UPO (1
N 13
)
3. GROSS AREA: 33.63± ACRES S. D
LUTHER VILLAGE IV OF DOVER, INC. PARCEL: 02.79± ACRES
"EDGEHILL ACRES"
LOCATION MAP 1"=1200'
CITY OF DOVER - EAST DOVER HUNDRED - KENT COUNTY, DELAWARE
4. EXISTING ZONING: RG-2, GENERAL RESIDENTIAL
PROPOSED ZONING: RG-2, GENERAL RESIDENTIAL ZONED R-8
CONDITIONAL USE: PLANNED NEIGHBORHOOD DESIGN SENIOR CITIZEN HOUSING OPTION
N45°39'39"E 1373.03'
BULK AREA RESTRICTIONS: RG-2
958.32
PHASE 5
S44°20'21"E
LUTHER VILLAGE IV
LOT AREA PER DWELLING UNIT 1700 SF/DU ' 86,921.48± SF
1
83/9
D
LOT WIDTH (FT.) 100 NA
AN N45°39'39"E 48
LOT DEPTH (FT.) 125
OWNER/DEVELOPER
PL
DE STATE PLAN NAD 83/91
ATE 127.61'
FRONT YARD (FT.) 30 ST
E FH
D
MINIMUM SIDE YARD (FT.) 10
EXISTING 0'
"CLEARVIEW MEADOW"
TOTAL SIDE YARDS (FT.) 50 9.2 ST
.
29
MARTIN LUTHER FOUNDATION OF DOVER, INC.
REAR YARD (FT.) 30 AN
OFF-STREET PARKING SPACES: 1
STORMWATER E RM
CK
S46°22'17"E
MANAGEMENT
SITE PLAN
BUILDING HEIGHT: 40' FH
O
LO
SITE
BUILDING STORIES: 3 47 E.
AREA "E
430 KINGS HIGHWAY
3 GrB
LOT COVERAGE: 60% 5'4
FLOOR AREA RATIO: N/A (2.18± ACRES) PROPOSED 30' HDPE
STORM CULVERT
N1
7°4 (HS FOR
ACCESS TO PUBLIC STREET: BABB DRIVE
UlA GB
(HS )
ZONED R-8
DOVER, DE 19901
5. TOPOGRAPHIC SURVEY:
HkB (HSG ' 3-S
GC
B) 97 .07 ) 46
E 1 TOR
FUTURE 3-STORY APARTMENT BUILDING FUTURE 3-STORY APARTMENT BUILDING
A. FIELD SURVEYS BY LANDMARK ENGINEERING, INC., APRIL 2013, FEB 2017, JUNE & JULY 2024, '02" 63 UNITS 63 UNITS
Up (HSG C °57 YA
AND A PHOTOGRAMMETRIC SURVEY BY AXIS GEOSPATIAL LLC FROM FLIGHT ON 02/10/2013. ) N23
ING
(302) 674-1408
SG B)
R=600.00'
ED ILD
E=
A=83.71' (FF NITS PHASE 7 PHASE 9
POS T BU
B. VERTICAL DATUM: NAVD 88 72 U
297.27'
CHD=N22°03'47"W
PRO TMEN
C. PROJECT BENCHMARK: ELEVATION = 36.16 (EXISTING SMH RIM, NEAR END OF BABB DR,) 106,300.32± SF 189,918.52± SF
GrB (H S66
CHL=83.64' FH 45
PAR 35.5
) HN
PERIMETER PROPERTY CORNER MARKERS:
R=125.00'
FH
°02 FD
C JO
'58"
● ■ EXISTING (10)
A=54.75' NN
○ □ PROPOSED (0) HU
CHD=N08°39'37"W E 3 C)
BR
CHL=54.32'
6. WATER SUPPLY: CITY OF DOVER 26. SG 44 OW
40' (H N
R=40.00' RD
WATER MAIN OUTSIDE CITY OF DOVER RIGHT OF WAY SHALL BE PRIVATELY MAINTAINED. A .
A=50.29' Ul
1' CHD=S10°21'19"E FUTURE
7. SANITARY SEWER: CITY OF DOVER .7 STORMWATER MANAGEMENT
1 66 '3 9"W CHL=47.04' AREA
°39
SANITARY MAIN OUTSIDE CITY OF DOVER RIGHT OF WAY SHALL BE PRIVATELY MAINTAINED. "E S25 43
BABB DRIVE
'19
53 .38' FUTURE 2-STORY
8. TRASH REMOVAL: PRIVATE 3° 233 TOWN CENTER PHASE 5A
R=40.00' N0 16,000± SQ. FT.
48,528.87± SF
9. DEBRIS DISPOSAL: NO DEBRIS WILL BE BURIED OR DISPOSED OF ON THIS SITE.
A=26.26'
'
PHASE 5
CHD=N14°55'13"W
16 7.51 86,921.48± SF
CHL=25.79' W S08°32'04"W 42
9" 7'
10. LOT COVERAGE: PROPOSED: 6.65 ACRES °39'3 74.2 45.45'
S25
OWN
'
120.28
PERMITTED (60%): 20.18 ACRES
93.2
5' 66.3
11. NO 100-YEAR FLOOD PLAIN EXISTS ON THIS PARCEL IN ACCORDANCE WITH FLOOD INSURANCE 3'
PHASE 6 LOCATION MAP 1"=400'
(WIDT
ROAD
.63'
3'46"W °20
RATE MAP, 10001C0167H, DATED MAY 5, 2003. 50
E 2 151,439.67± SF 41
S64
.12'
'39" PHASE 8
'2
PHASE 5B
H VAR
°39
°20
"CLEARVIEW MEADOW"
12. CRITICAL NATURAL AREAS: THE STATE INVENTORY OF CRITICAL NATURAL AREAS HAS BEEN
AY N25
N33°4 '21" 79,840.59± SF
105
EXAMINED AND NONE WERE FOUND TO EXIST ON THE SITE. S11°11'02"E 93.10' 43,944.71± SF
S64
H VAR
R
IES)
ELL W
E
UNN B IES)
13. WETLANDS: THIS SITE WAS EVALUATED IN ACCORDANCE WITH THE PROCEDURES SET FORTH IN FUTURE 3-STORY APARTMENT BUILDING FUTURE 3-STORY APARTMENT BUILDING
68 UNITS 63 UNITS
THE 1987 CORPS OF ENGINEERS WETLAND DELINEATION MANUAL (TECHNICAL REPORT Y-87-1), AND
S25°39'39"W 48.75' 40
SUBSEQUENT PUBLIC NOTICES AND REGIONAL SUPPLEMENTS TO IDENTIFY THE PRESENCE OF
1"E
WALKING PATH
UT
BUNN
(WIDT
RT
H
O
JURISDICTIONAL WETLANDS, AND NO WETLANDS WERE FOUND TO EXIST ON THE SITE.
N
JOHN
249
.73'
N33°43'46"W 115.13' .08'
14. TREE PRESERVATION: THE DEVELOPER SHALL PRESERVE ALL TREES ON THIS SITE EXCEPT 144
259
H
ZONED R-8
P.O. BOX 299
WHERE NECESSARY TO CONSTRUCT BUILDINGS, ACCESSWAYS, AND UTILITIES, AND WHERE .20'
SELECTIVE THINNING OF EXISTING VEGETATION IS APPROVED. EXISTING PLANT MATERIALS 200 CONTINENTAL DRIVE
DESIGNATED TO REMAIN ON THIS PLAN, OR THE LANDSCAPE PLAN, SHALL BE PRESERVED AND
.06'
39
CR-02 CR-03
PERRYVILLE, MD 21903
BENCHMARK: SUITE 400
326
PROPERLY PROTECTED DURING CONSTRUCTION. IN THE CASE OF UTILITY RIGHTS-OF-WAY AND
EASEMENTS, ANY DISTURBED AREAS SHALL BE REPLANTED SO AS TO ACHIEVE A RECURRENCE OF
SMH RIM, ELEV.: 36.16 NEWARK, DE 19713
PHONE (410) 939-2144
NATURAL VEGETATIVE COVER.
PHONE (302) 323-9377
S42°36'51"E 125.59'
R=1090.00' R=1090.00' 38
15. LAND DEVELOPMENT DATA: A=5.99' A=263.80'
FAX (302) 323-9461
FAX (302) 323-9461
R=150.00' CHD=S20°38'00"W CHD=S27°43'27"W
A=263.40'
EXISTING BUILDING AREA: (50,009 SF) 1.15 ACRES = 03.42% N33°4 CHD=N84°02'03"W
CHL=5.99' CHL=263.16' WWW.LANDMARK-SE.COM
EXISTING PAVED AREA: 3.70 ACRES = 11.00%
CR-05 INFOMD @ LANDMARK-SE.COM
Landmark
R=150.00' PHASE 9
CHL=230.84' R=975.00' INFO @ LANDMARK-SE.COM
3'46"W
EXISTING STORMWATER MANAGEMENT (SWM) AREA: 2.18 ACRES = 06.48% A=65.93' FH PHASE 6
950.01'
PROPOSED BUILDING AREA: (19,027 SF) 0.44 ACRES = 01.31% PHASE 5A A=59.90' 189,918.52± SF 37
CHD=S33°04'06"W
PROPOSED PAVED AREA:
PROPOSED SWM AREA:
1.36 ACRES = 04.04%
-0- ACRES = 00.00%
CHL=65.40' 48,895.41± SF
CHD=S43°54'03"W
CHL=59.89'
151,439.67± SF CR-04
PROPOSED OPEN & LANDSCAPE SURFACE AREA: 24.8 ACRES = 73.75% FH
N56°08'17"W 50.00' 640.29' S45°39'39"W
33 S45°39'39"W 121.47' 36
TOTAL 33.63 ACRES = 100% 8.
FH 89
'
FH 52
27 28 29 30 31 32 33 34 35
16. PARKING DATA: PHASE IV
TYPICAL PARKING SPACES SHALL MEASURE 9' X 18'.
JO FH
S06°23'32"W 43.94' "CLEARVIEW MEADOW"
PROPOSED USE: PND SENIOR CITIZEN HOUSING OPTION 6.25' R=1000.00' 99
ZONED R-8
HN A=315.11' R=950.00'
PARKING SPACES REQUIRED: 72 SPACES
PARKING SPACES PROVIDED: 82 SPACES W
N
N35°52'0
CHD=S24°50'05"W
CHL=313.81'
A=101.61'
CHD=S36°55'33"W
KEY MAP 1"=400'
3"W 24
O ES) CHL=101.56'
BRVARI
(INCLUDING 4 HANDICAPPED PARKING SPACES)
BLUECOAT STREET
Science & Engineering
PARKING RATIONALE: 1 SPACE/ DU = 72 SPACES C) )
NNDTH HSG
GB (WIDTH VARIES)
LOADING BAYS (12' X 60' MIN) REQUIRED: 1 BAY PER APT. BUILDING
HU (WI (HS R=1000.00' AD
ROES)
LOADING BAYS PROVIDED: 1 BAY A=209.22'
5 Up (
AD N8
°3 GrB
CHD=S09°48'49"W
LL ARI
RO HI V
17. FIRE PROTECTION: ALL FIRE LANES, FIRE HYDRANTS, SPRINKLERS, STANDPIPE CONNECTIONS AND CHL=208.84'
9'4
FIRE EXITS SHALL BE MARKED AND PROTECTED IN ACCORDANCE WITH THE DELAWARE STATE FIRE
PREVENTION REGULATIONS. A FIRE MARSHAL RECORD-TYPE PLAN, LAST DATED XX/XX/XXXX, OR 6"
W
B IDTH
AS LATER AMENDED AND APPROVED IN WRITING BY THE STATE FIRE MARSHAL, IS HEREBY NO (W
CONSIDERED PART OF THIS PLAN. S03°49'14"W 24.64'
LA
FIRE HYDRANTS:
FH
FH (7) EXISTING E E
FH
FH (2) PROPOSED R IV S) IV
D IE AR DR S)
B V G RIE
AB TH
18. DRAINAGE, EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT SHALL COMPLY
WITH THE THE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL'S
B (WID BU H VA
DY(WID T
ALL CONSTRUCTION MUST BE DONE
THIS DRAWING DOES NOT INCLUDE
DELAWARE SEDIMENT AND STORMWATER REGULATIONS AND THE DELAWARE EROSION AND
SEDIMENT CONTROL HANDBOOK, 2023
IN COMPLIANCE WITH
19. A LANDSCAPE PLAN PREPARED BY XXXXXXXXXXXXXX, LAST DATED XX/XX/XXXX, OR AS LATER
PLAN VIEW THE OCCUPATIONAL SAFETY AND
NECESSARY COMPONENTS FOR
AMENDED IS HEREBY CONSIDERED TO BE A PART OF THIS PLAN.
SCALE 1" = 100'
20. POSTAL ADDRESS: 400 BABB DRIVE HEALTH ACT OF 1970 AND
THE RULES AND REGULATIONS
CONSTRUCTION SAFETY.
21. WAIVER: RELIEF FROM THE CITY OF DOVER CODE APPENDIX A, ARTICLE VI, §A.8(b), REQUIRING A
SECOND CONNECTION TO A STATE OR CITY-MAINTAINED STREET IF A DEVELOPMENT CONTAINS 150
OR MORE DWELLING UNITS. THERETO APPURTENANT
22. ALL STORMWATER MANAGEMENT FACILITIES ARE TO BE OWNED AND MAINTAINED BY THE
COMMISSION:
SHEET: CR-01 of 05
PROJECT'S OWNER.
200
C 2024 LANDMARK SCIENCE & ENGINEERING
DESIGN BY: CML\RWS DATE: 08/01/2024
C1243-7
SCALE: 1"=100'
23. AIRPORT ZONE: THE US DEPARTMENT OF TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, CERTIFICATION OF PLAN ACCURACY CERTIFICATION OF OWNERSHIP
SHALL HAVE THE RIGHT AND AUTHORITY TO IMPLEMENT SUCH RESTRICTIONS AND SAFEGUARDS
FILE NAME: C1243-7 Site Plan.dwg
ON THE PREMISES, AS MAY BE REASONABLY NECESSARY TO PROTECT THE SAFETY AND WELFARE I, CRAIG M. LYNCH, P.E., HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF I, RICHARD MURPHY of the MARTIN LUTHER FOUNDATION OF DOVER, INC, HEREBY CERTIFY
GRAPHIC SCALE
OF THE PUBLIC. DELAWARE, THAT THE INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY THAT I AM THE OWNER'S RIGHTFUL REPRESENTATIVE OF THE PROPERTY DESCRIBED AND
CR-01
SUPERVISION, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF, REPRESENTS GOOD SHOWN ON THIS PLAN, THAT THE PLAN WAS MADE AT THE OWNER'S DIRECTION, AND THAT
24. MAINTENANCE OF COMMON FACILITIES: FOR MAINTENANCE OF THE COMMON FACILITIES SOILS CHART ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE. THEY ACKNOWLEDGE THE SAME TO THEIR BY ACT AND DESIRE THE PLAN TO BE DEVELOPED
INCLUDING THE STORMWATER MANAGEMENT FACILITY AND COMMON AREAS SHOWN ON THE PLAN, SOIL TYPE DESCRIPTION HSG 100
AS SHOWN AND IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS.
SEE THE MAINTENANCE DECLARATION DATED 11/23/2004, AND OF RECORD IN THE OFFICE OF THE
RECORDER OF DEEDS IN AND FOR KENT COUNTY, STATE OF DELAWARE, PLOT BOOK 671, PAGES
UIA UNICOM LOAM, 0 TO 2 PERCENT SLOPES C THE PURPOSE OF THIS PLAN IS TO DEVELOP PHASE 4 OF
DRAWN BY: RWS CHECK BY: CML
GrB GREENWICH LOAM 2 TO 5 PERCENT SLOPES B
129 AND 308. A MASTER-PLANNED SENIOR HOUSING OPTION FACILITY 50
Up URBAN LAND C
25. THE NOTICE OF INTENT (NOI) FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION HkB HAMBROOK-URBAN LAND COMPLEX, 0 TO 5 PERCENT SLOPES B CONSISTING OF 72 APARTMENTS AND ASSOCIATED
SIGNATURE DATE RICHARD MURPHY, BOARD PRESIDENT DATE
ACTIVITY UNDER A NPDES GENERAL PERMIT HAS BEEN FILED WITH THE STATE OF DELAWARE IMPROVEMENTS.
DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL FOR THIS PROJECT AND MARTIN LUTHER FOUNDATION OF DOVER, INC.
0
HAS BEEN ASSIGNED DATABASE I.D. # .
45
Page 46
Item 1.
WALKING PATH
RT
H
NO
CR-02 CR-03 CHECKED
BY
CR-05
CR-04
REVISIONS
N45°39'39"E 1373.03'
MATCH LINE SEE SHEET CR-03 OF 05
KEY MAP 1"=400'
END OF PROPOSED
30' WIDE PAVED DRIVE
CITY OF DOVER - EAST DOVER HUNDRED - KENT COUNTY, DELAWARE
PROPOSED PCC CURB
TYPE 1-6 (TYP)
W W W W
LUTHER VILLAGE IV
R W
ip
-R
LEGEND ap
TREES TO BE
W
REMOVED (3) 30' 0'
W 9.2
OWNER/DEVELOPER
EXISTING VERTICAL PCC CURB 29
PROPOSED 6' WIDE PAVED WALK (TYP.)
PROPOSED PCC CURB TYPE 1-6 W 6"FW
MARTIN LUTHER FOUNDATION OF DOVER, INC.
EXISTING PCC SIDEWALK PROPOSED 30' WIDE PAVED DRIVE (TYP.)
W
SITE PLAN
PROPOSED PCC SIDEWALK W/ RAMP
430 KINGS HIGHWAY
PROPOSED 6' CROSSWALK (TYP.)
PROPOSED PAVED WALKWAY W
FOR
6"F
EXISTING BUILDING W
PROPOSED BUILDING EXISTING W DOVER, DE 19901
PROPOSED FIRE WATER
STORMWATER MANAGEMENT
(302) 674-1408
PROPOSED GAS SERVICE
PROP. STORMWATER MANAGEMENT ESMT.
FH
AREA
EXISTING FIRE HYDRANT (2.18± ACRES) W
G W
6"F
FH
PROPOSED FIRE HYDRANT
PROPOSED 5' WIDE
EXISTING FENCE PCC SIDEWALK (TYP)
PROPOSED
W
20' x 20' CONC. PAD 24'
PROPOSED 30' HDPE P)
W EXISTING WATER MAIN (TY
STORM CULVERT 18'
P)
W PROPOSED WATER MAIN (TY
W
6"F
SS EXISTING SANITARY SEWER W
'43
"E (TY 9'
5
7°4 P)
N1 PROPOSED GAZEBO
PROPOSED SANITARY SEWER W/ MANHOLE
(SEE ARCH. PLANS)
EXISTING STORM DRAIN W/ INLET TREE TO BE
REMOVED
3-S
W
EXISTING SIGN
W
6"F
N33°43
TOR
'4
GAZEBO TO BE RELOCATED AT '
6"W 9 THE DIRECTION OF THE OWNERS 97 .07
E 1
T
W 2"
57'0
PAR 35.5
°
58.32' N23
)
PRO
Y A (FFE= NITS
END OF EXISTING 6"F
PAVED DRIVE W
SED ILD
W
72 U
R=600.00'
PO NT BU
A=83.71'
CHD=N22°03'47"W P.O. BOX 299
CHL=83.64' 200 CONTINENTAL DRIVE
PERRYVILLE, MD 21903
SUITE 400
6"F
ME
W
NEWARK, DE 19713
FH PHONE (302) 323-9377 PHONE (410) 939-2144
TREES TO BE
FAX (302) 323-9461
REMOVED (3) FAX (302) 323-9461
WWW.LANDMARK-SE.COM
ING
W UE
INFOMD @ LANDMARK-SE.COM
FH
Landmark
FD
W W
C INFO @ LANDMARK-SE.COM
10"
W
'58"
°02
4"D
W W PROPOSED
S66
R=125.00' 4"F 4" DOMESTIC
W
A=54.75' W
WATER
CHD=N08°39'37"W W E 3
CHL=54.32' 26.
W 40'
10"
P:\C1243 LUTHER VILLAGE\C1243-7 RECORD AND CONSTRUCTION PLANS\PLANS\SITE (RECORD)\C1243-7 SITE PLAN.DWG
Science & Engineering
"W
10 4-S
AY TREES TO BE
YA
ss
W S) REMOVED (2)
LL ARIE TOR PROPOSED SANITARY
E
ING
SERVICE
N V
N ID TH
NG BUILD
4
B U (W
STI
"W
10
EXI MENT
T
PAR8 UNITS
30 '
"W PROPOSED RESIDENT AMENITY
10 (SEE ARCH. PLANS)
1' ALL CONSTRUCTION MUST BE DONE
THIS DRAWING DOES NOT INCLUDE
6.7
16 PROPOSED SANITARY THIS DRAWING AND THE DESIGN
9"
E SEWER MAIN SHOWN ARE THE EXCLUSIVE IN COMPLIANCE WITH
1
53'
THE OCCUPATIONAL SAFETY AND
3° SCO PROPERTY OF LANDMARK
NECESSARY COMPONENTS FOR
"W SCO
N0 10
SCIENCE AND ENGINEERING AND
FUTURE DRIVE HEALTH ACT OF 1970 AND
.38' SHALL NOT BE ALTERED OR
233
THE RULES AND REGULATIONS
SS
CONSTRUCTION SAFETY.
> COPIED WITHOUT WRITTEN
"W PERMISSION. THERETO APPURTENANT
10
COMMISSION:
SHEET: CR-02OF 05
TREES TO BE
NG ENT 60
08/01/2024
C 2024 LANDMARK SCIENCE & ENGINEERING
STI
R=40.00' REMOVED (2)
SS
EXI RESID M
C1243-7
A=26.26'
SCALE: 1"=30'
>
CHD=N14°55'13"W
Y OO
FILE NAME: C1243-7 Site Plan.dwg
"W
TOR
CHL=25.79' 10
YR
1-S TIVIT
GRAPHIC SCALE
DESIGN BY: CML\RWS DATE: CR-02
AC
7'
.51' 74.2 S08°32'04"W
167
"W SS 45.45' 30
9'39
S25°3 >
DRAWN BY: RWS CHECK BY: CML
10"W
15
SS E
93.2
5' '21"
°20
S64
3'
66.3
> 0
46
CO RD
Page 47
Item 1.
St
ep
St s
St
WALKING PATH
ORT ep
N
H
s ep
St s
ep St
ep
s s
St
ep
s St
ep St
"EDGEHILL ACRES" s ep
CR-02 CR-03 ZONED R-8
s
CHECKED
BY
CR-05
CR-04 N45°39'39"E 1373.03'
REVISIONS
MATCH LINE SEE SHEET CR-02 OF 05
PHASE 5
86,921.48± SF
N/F
KEY MAP 1"=400' CHARLES &
SHIRLETTA
MARSHALL
FUTURE WALKING PATH (TYP) TP# 2-05-07707-08-4800
FUTURE DRIVE
CITY OF DOVER - EAST DOVER HUNDRED - KENT COUNTY, DELAWARE
N45°39'39"E
127.61'
W W W
LUTHER VILLAGE IV
LEGEND FH
OWNER/DEVELOPER
EXISTING VERTICAL PCC CURB
S46°22'17"E
PROPOSED PCC CURB TYPE 1-6
MARTIN LUTHER FOUNDATION OF DOVER, INC.
EXISTING PCC SIDEWALK
SITE PLAN
PROPOSED PCC SIDEWALK W/ RAMP
PROPOSED PAVED WALKWAY FOR 430 KINGS HIGHWAY
N/F
EXISTING BUILDING THOMAS
DOVER, DE 19901
FH
PRZEMYSLAW
PROPOSED BUILDING KARLOWSKI
TP# 2-05-07707-08-4700
(302) 674-1408
PROP. STORMWATER MANAGEMENT ESMT.
"CLEARVIEW MEADOW"
FH
EXISTING FIRE HYDRANT
FH PROPOSED 5' WIDE
PROPOSED FIRE HYDRANT
PCC SIDEWALK (TYP)
EXISTING FENCE 24'
P)
(TY
W EXISTING WATER MAIN
ZONED R-8
W PROPOSED WATER MAIN
9' 24'
P)
SS EXISTING SANITARY SEWER (TY EV
18'
AR
P)
(TY
PROPOSED SANITARY SEWER W/ MANHOLE CH
G
EXISTING STORM DRAIN W/ INLET GIN N/F
CES
DAVID DEVARD
S44°20'21"E 950.01'
EXISTING SIGN (TY 9'
SPA FUTURE 3-STORY APARTMENT BUILDING
P) TP# 2-05-07707-08-4600
(8)
FUTURE 3-STORY APARTMENT BUILDING
63 UNITS
63 UNITS
PHASE 7 PHASE 9
106,300.32± SF 189,918.52± SF
N/F
P.O. BOX 299
LISA M.
200 CONTINENTAL DRIVE
6"F
RIVERA-VELEZ &
PERRYVILLE, MD 21903
W EUGENIO M. SUITE 400
PROPOSED PCC CURB
TYPE 1-6 (TYP) RODRIGUEZ NEWARK, DE 19713
PHONE (410) 939-2144
FH
TP# 2-05-07707-08-4500
PHONE (302) 323-9377
FAX (302) 323-9461
UE FAX (302) 323-9461
FD
C WWW.LANDMARK-SE.COM
INFOMD @ LANDMARK-SE.COM
Landmark
INFO @ LANDMARK-SE.COM
PROPOSED ELECTRIC SERVICE
297.27'
N/F
VALERIE
KELYATTA BANKS
P:\C1243 LUTHER VILLAGE\C1243-7 RECORD AND CONSTRUCTION PLANS\PLANS\SITE (RECORD)\C1243-7 SITE PLAN.DWG
TP# 2-05-07707-08-4400
Science & Engineering
PROPOSED 5' WIDE
PCC SIDEWALK (TYP)
R=40.00'
W A=50.29'
'39"
S25
°39 CHD=S10°21'19"E
CHL=47.04' FUTURE FUTURE SECOND FLOOR
ENCLOSED WALKWAY (TYP)
FUTURE DRIVE
STORMWATER MANAGEMENT
AREA
N/F
DEBRA KAY EVANS
TP# 2-05-07707-08-4300
ALL CONSTRUCTION MUST BE DONE
THIS DRAWING DOES NOT INCLUDE
THIS DRAWING AND THE DESIGN
SHOWN ARE THE EXCLUSIVE IN COMPLIANCE WITH
FUTURE 2-STORY PROPERTY OF LANDMARK THE OCCUPATIONAL SAFETY AND
TOWN CENTER NECESSARY COMPONENTS FOR
FUTURE DRIVE
PHASE 5A SCIENCE AND ENGINEERING AND
HEALTH ACT OF 1970 AND
48,528.87± SF
16,000± SQ. FT. SHALL NOT BE ALTERED OR
THE RULES AND REGULATIONS
CONSTRUCTION SAFETY.
COPIED WITHOUT WRITTEN
PERMISSION. THERETO APPURTENANT
08/01/2024
1"=30'
PHASE 5
COMMISSION:
SHEET: CR-03OF 05
60
C 2024 LANDMARK SCIENCE & ENGINEERING
86,921.48± SF
C1243-7
N/F
FILE NAME: C1243-7 Site Plan.dwg
LESLIE MOSLEY
SCALE:
GRAPHIC SCALE
TP# 2-05-07707-08-4200
DESIGN BY: CML\RWS DATE: CR-03
30
DRAWN BY: RWS
MATCH LINE SEE SHEET CR-04 OF 05
CHECK BY: CML
15
0
47
Page 48
Item 1.
86,921.48± SF
N/F
LESLIE MOSLEY
TP# 2-05-07707-08-4200
MATCH LINE SEE SHEET CR-03 OF 05
CHECKED
BY
PHASE 6
151,439.67± SF
N/F
LISA L. TOLBERT-SCOTT
TP# 2-05-07707-08-4100
PHASE 8
REVISIONS
79,840.59± SF
FUTURE 3-STORY APARTMENT BUILDING FUTURE 3-STORY APARTMENT BUILDING
N/F
68 UNITS 63 UNITS MICHAEL D. SCOTT
CITY OF DOVER - EAST DOVER HUNDRED - KENT COUNTY, DELAWARE
MATCH LINE SEE SHEET CR-05 OF 05
TP# 2-05-07707-08-4000
"CLEARVIEW MEADOW"
LUTHER VILLAGE IV
OWNER/DEVELOPER
ZONED R-8 MARTIN LUTHER FOUNDATION OF DOVER, INC.
S44°20'21"E 950.01'
SITE PLAN
FOR 430 KINGS HIGHWAY
N/F
SERGE ARSENE NYA
NYANDA & CHRISTELLE
DOVER, DE 19901
FRIDELINE NAYAKIE NYA
TP# 2-05-07707-08-3900
(302) 674-1408
N/F
THOMAS BOYCE
TP# 2-05-07707-08-3800
FUTURE DRIVE
PHASE 9
189,918.52± SF N/F
BENJAMIN HERRERA
TP# 2-05-07707-08-3700
PHASE 6
151,439.67± SF
P.O. BOX 299
200 CONTINENTAL DRIVE
PERRYVILLE, MD 21903
SUITE 400
NEWARK, DE 19713
PHONE (302) 323-9377 PHONE (410) 939-2144
N/F FAX (302) 323-9461
FAX (302) 323-9461
S45°39'39"W
640.29' GARY LEWIS
R=975.00' TP# 2-05-07707-08-3600 WWW.LANDMARK-SE.COM
INFOMD @ LANDMARK-SE.COM
Landmark
A=59.90' INFO @ LANDMARK-SE.COM
CHD=S43°54'03"W
CHL=59.89'
S06°23'32"W 43.94'
"CLEARVIEW MEADOW"
R=950.00'
ZONED R-8
A=101.61'
CHD=S36°55'33"W N/F
CHL=101.56' CLEARVIEW
N/F N/F N/F
N/F N/F N/F N/F N/F N/F MEADOW
NIKITA WEBB DANIEL D. & ANN MASTINGOR & ANNE JEAN KIMBERT MARCELIN & ZENAIDA NIEVES-CORDERO AHMED ALSAMET ABDO HOMEOWNERS
EILEEN V. WILLIAMS ANH NGUYEN
P:\C1243 LUTHER VILLAGE\C1243-7 RECORD AND CONSTRUCTION PLANS\PLANS\SITE (RECORD)\C1243-7 SITE PLAN.DWG
CYNTHIA M. TWINE TP# 2-05-07707-08-3400 TP# 2-05-07707-08-3500
TP# 2-05-07707-08-2700 TP# 2-05-07707-08-2800 TP# 2-05-07707-08-2900 TP# 2-05-07707-08-3000 M. EMERSON MARIE DESIR MARCDARLINE CLEDOMY ASSOCIATION
N/F TP# 2-05-07707-08-3200 TP# 2-05-07707-08-3300
TP# 2-05-07707-08-3100 TP# 2-05-07707-08-5200
ROSHRON B. GIVENS
Science & Engineering
TP# 2-05-07707-07-9900
LEGEND
EXISTING VERTICAL PCC CURB
EXISTING HOUSE PROPOSED PCC CURB TYPE 1-6
EXISTING PCC SIDEWALK
ALL CONSTRUCTION MUST BE DONE
THIS DRAWING DOES NOT INCLUDE
PROPOSED PCC SIDEWALK W/ RAMP THIS DRAWING AND THE DESIGN
58'
IN COMPLIANCE WITH
WALKING PATH
END OF EXISTING BLUECOAT STREET SHOWN ARE THE EXCLUSIVE
RT
H
O
PROPOSED PAVED WALKWAY
N
PAVED DRIVE
PROPERTY OF LANDMARK THE OCCUPATIONAL SAFETY AND
(WIDTH VARIES)
NECESSARY COMPONENTS FOR
EXISTING BUILDING
59' SCIENCE AND ENGINEERING AND
HEALTH ACT OF 1970 AND
30'
PROPOSED BUILDING
CR-02 CR-03 SHALL NOT BE ALTERED OR
THE RULES AND REGULATIONS
CONSTRUCTION SAFETY.
COPIED WITHOUT WRITTEN
PROP. STORMWATER MANAGEMENT ESMT.
PERMISSION. THERETO APPURTENANT
FH
EXISTING FIRE HYDRANT
SHEET: CR-04OF 05
COMMISSION:
FH
08/01/2024
60
C 2024 LANDMARK SCIENCE & ENGINEERING
PROPOSED FIRE HYDRANT
C1243-7
SCALE: 1"=30'
EXISTING FENCE
CR-05
FILE NAME: C1243-7 Site Plan.dwg
GRAPHIC SCALE
W EXISTING WATER MAIN
CR-04
DESIGN BY: CML\RWS DATE: CR-04
W PROPOSED WATER MAIN
30
SS EXISTING SANITARY SEWER
DRAWN BY: RWS CHECK BY: CML
PROPOSED SANITARY SEWER W/ MANHOLE 05
EXISTING STORM DRAIN W/ INLET
FH
EXISTING SIGN KEY MAP 1"=400' 0
48
Page 49
P:\C1243 LUTHER VILLAGE\C1243-7 RECORD AND CONSTRUCTION PLANS\PLANS\SITE (RECORD)\C1243-7 SITE PLAN.DWG
N
O
RT
H
SS W W
FH FH
KEY MAP
CR-05
CR-02
LEGEND
EXISTING SIGN
EXISTING FENCE
WALKING PATH
EXISTING BUILDING
PROPOSED BUILDING
EXISTING WATER MAIN
PROPOSED WATER MAIN EXISTING FIRE HYDRANT EXISTING PCC SIDEWALK
EXISTING SANITARY SEWER PROPOSED FIRE HYDRANT
PROPOSED PAVED WALKWAY
CR-04 CR-03
PROPOSED PCC CURB TYPE 1-6 EXISTING VERTICAL PCC CURB
EXISTING STORM DRAIN W/ INLET
PROPOSED PCC SIDEWALK W/ RAMP
1"=400'
PROPOSED SANITARY SEWER W/ MANHOLE PROP. STORMWATER MANAGEMENT ESMT.
FH
958.32
' N33°43
'46"W
JOHN
H UNN B
(WIDT
ROW N ROA
H VAR D
IES)
HN
JO
N
W
O ES) 30' BUNN
ELL W
BRVARI " N8 (WIDT AY
H VAR
'46 IES)
NNDTH 39 10"W
W 5°
HU (WI 8
33 10"W
AD 9'
RO .8 10
"W 10"W
10"W
" 10"W N33°43
W10 '46"W
120.28
10 ' "W
10"W
R=150.00'
4 10 8"W
7' "W
22 ' A=263.40'
CHD=N84°02'03"W N33°43'46"W 115.13'
" CHL=230.84'
W10
8"W
"W
10
> FH
10 8"W
"W
SS
°
N35°52'0
3"W 246 N25
.25'
39'3
10
2
"W "W 9"E
10
W 50.6
3'
>
8"W
SS
S03°49'14"W 24.64'
FH
10
"W
10
"W
>
SS
B (WID B V
10
"W 8"W
AB TH E
AR IV S)
R 10 NIT
>
D IE "W 8U
SS
Y6 G
TOR UILDIN
3-S
NG ENT B33
26 STI .
' EXI PARTM F.F. 36
' A
> 50
S45°39'39"W 121.47'
SS 10
R=1000.00' "W
R=150.00'
A=209.22'
A=65.93'
>
CHD=S09°48'49"W
SS CHD=S33°04'06"W
CHL=208.84'
10
"W CHL=65.40'
R=1090.00'
>
INV. 31.17 105
A=5.99' .12'
SS SS SCO
10 CHD=S20°38'00"W
"W SS
( S64
IV LA SS CHL=5.99' °20
'21"
DR E 2
> 49.2
G IES) SS 0'
BU VAR SS
DYWIDTH
E SS
10" > 144
58' W .08'
SS UT
30
'
MATCH LINE SEE SHEET CR-02 OF 05
>
SS
>
S42°36'51"E 125.59'
SS
10"
W
> UT
SS
>
SS
SS >
26'
SS
S25°39'39"W 48.75'
>
> '66 8"W
W
10"
SS > SS UT
>
SS
8"W
30' SS
>
>
8"W
SS > SS FH
>
S11°11'02"E 93.10'
W SS
10" T
SS 8"W DEN
>
ESI
Y R O OM
TOR Y R
1-S TIVIT
5 AC
>
8"W 93.2
'
SS NIT
2U
Y3 G
8"W TOR UILDIN
2-S
> NG ENT B33
R=1000.00' STI .
> SS END OF EXISTING EXI PARTM F.F. 36
R=1090.00' A
SS
A=315.11'
PAVED DRIVE A=263.80' S25
CHD=S24°50'05"W
'39
CHD=S27°43'27"W °39
CHL=313.81' > SS E SS
WITH BARRICADE '21" > "W
> SS CHL=263.16' °20
S64 3'
66.3 167
SS >
.51'
SS
>
>
SS 74.2
> SS > 7'
SS
SS
>
SS
>
>
> SS SS
>
SS 259
.73'
48,895.41± SF PHASE 5A
FH
SS
>
G FUTURE DRIVE
> SS
>
SS
G
SS
>
SS
>
N56°08'17"W 50.00'
60' 326
43,944.71± SF
>
PHASE 5B
S08°32'04"W
30' .06'
SS
SS >
45.45'
SS
E >
R=950.00'
AD SS
A=101.61' >
ROES)
I
LL AR C CHD=S36°55'33"W
HI V E
B IDTH
CHL=101.56' END OF EXISTING
NO (W
PAVED DRIVE
WITH BARRICADE
MATCH LINE SEE SHEET CR-04 OF 05
N/F
REVISIONS CHECKED
DRAWN BY: RWS SCALE: 1"=30' THIS DRAWING AND THE DESIGN BY
200 CONTINENTAL DRIVE
SHOWN ARE THE EXCLUSIVE
PROPERTY OF LANDMARK SUITE 400 SITE PLAN
TP# 2-05-07707-07-9900
DESIGN BY: CML\RWS DATE: 08/01/2024
EXISTING HOUSE
SCIENCE AND ENGINEERING AND NEWARK, DE 19713
ROSHRON B. GIVENS
SHALL NOT BE ALTERED OR PHONE (302) 323-9377 FOR
CHECK BY: CML SHEET: CR-05OF 05 COPIED WITHOUT WRITTEN FAX (302) 323-9461
PERMISSION.
0 05 30 60 WWW.LANDMARK-SE.COM LUTHER VILLAGE IV
INFO @ LANDMARK-SE.COM
THIS DRAWING DOES NOT INCLUDE
GRAPHIC SCALE NECESSARY COMPONENTS FOR CITY OF DOVER - EAST DOVER HUNDRED - KENT COUNTY, DELAWARE
CONSTRUCTION SAFETY. P.O. BOX 299
PERRYVILLE, MD 21903
COMMISSION: ALL CONSTRUCTION MUST BE DONE
IN COMPLIANCE WITH
Landmark
Science & Engineering PHONE (410) 939-2144
OWNER/DEVELOPER
MARTIN LUTHER FOUNDATION OF DOVER, INC.
C1243-7 THE OCCUPATIONAL SAFETY AND FAX (302) 323-9461
CR-05 HEALTH ACT OF 1970 AND
430 KINGS HIGHWAY
INFOMD @ LANDMARK-SE.COM
THE RULES AND REGULATIONS DOVER, DE 19901
THERETO APPURTENANT (302) 674-1408
FILE NAME: C1243-7 Site Plan.dwg
C 2024 LANDMARK SCIENCE & ENGINEERING
49 Item 1.
Page 50
Item 1.
4" TOPSOIL, GRADED AND SEEDED & MULCHED, OR SODDED N45°39'39"E 1373.03'
DE STATE PLAN NAD 83/91
S. ET
RE
4" COMPACTED CRUSHER RUN (CR6-1.5") N ST
PO AN
DU RM
E
G HW CK
IG LOO
4" COMPACTED CRUSHER RUN (CR1-2.5")
G TH E. SITE
CHECKED
END OF PROPOSED AY
30' WIDE PAVED DRIVE (1 CML
BY
G 3)
NN
HU D.
HN N R
MIRAFI 600X OR DNREC-APPROVED G FUTURE DRIVE JO OW
EQUIVALENT GEOTEXTILE FABRIC
83
BR
BABB DRIVE
/9
D
1 G
N
AN
A
PROPOSED PCC CURB N45°39'39"E
PL
COMPACTED SUBGRADE, AT LEAST 2000 PSI TE TYPE 1-6 (TYP) 127.61'
ST
1. ADD ADDITIONAL HYDRANT BEHIND BUILDING
(90% MIN. MODIFIED PROCTOR DENSITY ASTM D1557) D
E
A
G PROPOSED 6' WIDE PAVED WALK (TYP.)
10"W 10"W
SUBGRADE EMERGENCY ACCESS LANE SECTION LITTLE CREEK
REVISIONS
FL 10"W 13)
ROAD
UPO
(NTS) 10"W '
G 30' FL G
29
9 .20 FH PLACE END CAP ON PROPOSED 10"
NT H
S.
BA
CEMENT-LINED CLASS 52 DUCTILE
IGH
D
OA
S46°22'17"E
IRON WATER MAIN EXTENSION
10"W 8"FW WAY YR
(
G )
6"W (113
PROPOSED 30' WIDE PAVED DRIVE (TYP.) S. D
FIRE
G
10
"W PROPOSED 6' CROSSWALK (TYP.)
G PROPOSED FIRE LANE
SIGN (TYP., SEE DETAIL)
LOCATION MAP 1"=1200'
8"F
W FL
CITY OF DOVER - EAST DOVER HUNDRED - KENT COUNTY, DELAWARE
6"W PROPOSED 5' WIDE
GENERAL DATA:
EXISTING G PCC SIDEWALK (TYP)
STORMWATER MANAGEMENT 22
PROPOSED GAS SERVICE 1. TAX PARCEL NUMBERS: 05-77.06-02-90.00, 05-77.06-02-90.01, 05-77.06-02-90.02
POND
G
FL PROPOSED 4" WIDE YELLOW FIRE
LANE DEMARCATION LINE (TYP)
LANE
2. POSTAL ADDRESS: 400 BABB DRIVE
LUTHER VILLAGE IV
"W
10
FIRE MARSHAL RECORD TYPE PLAN
G 3. GROSS AREA: 33.63± ACRES
W
8"F LUTHER VILLAGE IV OF DOVER, INC. PARCEL: 02.79± ACRES
6"W
OWNER/DEVELOPER
PROPOSED 4. BUILDING USE: SENIOR CITIZEN APARTMENTS
20' x 20' CONC. PAD 9'
P) 5. WATER SUPPLY: CITY OF DOVER
MARTIN LUTHER FOUNDATION OF DOVER, INC.
(TY
G
24' 6. PROP. BLDG. HEIGHT / HEIGHT OF HIGHEST FLOOR: 42'-9"± / 21'-4"±
PROPOSED 8" FIRE AND
28 P)
DOMESTIC WATER SERVICE (TY
W 18' 7. BUILDING CONSTRUCTION TYPE: 2B
430 KINGS HIGHWAY
3"E 8"F P)
FOR
"W '4 6"W
°45 17 (TY
10 7 C
EV
N1 8. BUILDING AREA TOTAL: 58,185± SF
x FIRST FLOOR: 20,205± SF
G
HAR SECOND FLOOR: 18,990± SF
DOVER, DE 19901
THIRD FLOOR: 18,990± SF
GIN
x
DENOTES BUILDING WITHIN
PAC
9. ALL FIRE LANES, FIRE HYDRANTS, AND FIRE DEPARTMENT CONNECTIONS SHALL BE
COVERAGE OF FIRE LANE
GS
(302) 674-1408
x MARKED IN ACCORDANCE WITH THE DELAWARE STATE FIRE PREVENTION
ING
(35% MIN., 53% PROVIDED) W REGULATIONS AND PER THE APPROVED FIRE MARSHAL RECORD TYPE PLAN.
6"W 8"F
ES
SED BUILD
G
(8) 10. PROPOSED BUILDING WILL HAVE AN AUTOMATED SPRINKLER SYSTEM.
7'
PO
.0
197 11. A LOCK BOX CONTAINING KEYS FOR FIRE DEPARTMENT ACCESS TO AUTOMATIC
2"E
T
PRO TMEN ITS
7'0 SPRINKLER SYSTEM SHALL BE PROVIDED. CONTACT LOCAL FIRE CHIEF FOR
10 N2 3°5
FIRE
"W ORDERING INFORMATION AND SEE PLAN FOR LOCATIONS OF BOX ON THE BUILDING
PROPOSED 18' WIDE 20' OR PLACE AS DIRECTED BY FIRE CHIEF.
END OF EXISTING SUBGRADE EMERGENCY 3
N
PAR 5) 72 U
PAVED DRIVE 6"W 8"F 12. ALL STANDPIPE AND SPRINKLER CONNECTIONS SHALL BE MARKED AND IDENTIFIED IN
ACCESS LANE W
ACCORDANCE WITH THE DELAWARE STATE FIRE PREVENTION REGULATIONS PART V,
YA
(SEE DETAIL, THIS SHEET)
FH SECTION 5-11.
5.
S66
TOR (FFE= 3
R=600.00'
A=83.71'
PROPOSED SOLID YELLOW 13. FIRE HYDRANTS SHALL BE COLOR-CODED IN ACCORDANCE WITH THE DELAWARE
°02 PAINTED FIRE LANE MARKING STATE FIRE PREVENTION REGULATIONS, PART III, SECTION 3-4.
CHD=N22°03'47"W
3-S
12
E 3
PHASE IV TEXT (TYP., SEE DETAIL)
LANE
CHL=83.64'
'58"
BEGIN PROPOSED 10" 14. ALL PROPOSED FIRE HYDRANTS AND WATER MAINS SHALL BE INSTALLED IN
CEMENT-LINED CLASS 52 ACCORDANCE WITH THE MOST CURRENT EDITION OF THE DELAWARE STATE FIRE
DUCTILE IRON WATER MAIN 26. 8"F
40' AREA = 2.79± ACRES W PREVENTION REGULATIONS (DSFPR REGULATION 702, CHAPTERS 6 & 7).
EXTENSION
15. ALL REQUIRED MEANS OF EGRESS SHALL HAVE AN EXIT DISCHARGE CONSISTING OF
FH
PLACE END CAP ON PROPOSED
M
FL NON-SLIP SURFACE, AND LEADING TO AND TERMINATING AT A PUBLIC WAY.
6" CEMENT-LINED CLASS 52
W
FH DUCTILE IRON WATER MAIN PROPOSED
W
10"
W 4" TYPE K COPPER FD
C
FL
DOMESTIC WATER
W LEGEND
DENOTES FIREFIGHTER
PROPOSED
297.27'
W
PERIMETER ACCESS PROPOSED PCC CURB TYPE 1-6
R=125.00' KNOX BOX
A=54.75'
W
(75% MIN., 93% PROVIDED) 26'
CHD=N08°39'37"W W
EXISTING BUILDING
CHL=54.32' PROPOSED FIRE
W
DEPARTMENT PROPOSED BUILDING
10"
CONNECTION PROPOSED PCC CURB FH
P.O. BOX 299
TYPE 1-6 (TYP) EXISTING FIRE HYDRANT
200 CONTINENTAL DRIVE
FH
PERRYVILLE, MD 21903
PROPOSED FIRE HYDRANT SUITE 400
W EXISTING WATER MAIN NEWARK, DE 19713
PHONE (302) 323-9377 PHONE (410) 939-2144
"W
10 4-S PROPOSED 4" WIDE SOLID YELLOW W PROPOSED WATER MAIN
AY FAX (302) 323-9461
FAX (302) 323-9461
YA
W ) PAINTED DEMARCATION LINE ON
TOR
PROPOSED FIRE LANE COVERAGE WWW.LANDMARK-SE.COM
L R I ES CURB FACE, AND CURB TOP (TYP.)
INFOMD @ LANDMARK-SE.COM
L
Landmark
R=40.00'
NE V INFO @ LANDMARK-SE.COM
A
I A=50.29'
FL PROP. SIGN FOR SUBGRADE EMERG. ACCESS
NG BUILD
N IDTH 9"W
46
39'3 CHD=S10°21'19"E
STI
U
B (W "W S25
°
EXI MENT
10
CHL=47.04'
OWNER/DEVELOPER:
T
PAR UNITS
FUTURE DRIVE MARTIN LUTHER FOUNDATION OF DOVER, INC.
430 KINGS HIGHWAY
DOVER, DE 19901
NG
"W (302) 674-1408
10
'
71 APPLICANT:
6.
16 LANDMARK SCIENCE & ENGINEERING
E 200 CONTINENTAL DRIVE, NEWARK, DE 19713
9"
3 '1
N0
3°
5
FUTURE 2-STORY
Science & Engineering
P:\C1243 LUTHER VILLAGE\C1243-7 RECORD AND CONSTRUCTION PLANS\PLANS\CNST\FIRE\FIRE & WATER.DWG
12"
.38'
233
3-3/4"
STI
NG ENT
EXI RESID M
Y
TOR Y R
1-S TIVIT
OO
FIRE 10' MIN.
PARKING 5-1/2"
1-7/8"
AC
S 2 5°39
'39"
W
167
.51' 74.27' S08°32'04"W
45.45'
100' MAX. FIRE 3"
1-1/2"
18"
THIS DRAWING DOES NOT INCLUDE
ALL CONSTRUCTION MUST BE DONE
IN COMPLIANCE WITH
LANE 3"
NECESSARY COMPONENTS FOR
THE OCCUPATIONAL SAFETY AND
LANE
E
93.2
5' '21"
°20 HEALTH ACT OF 1970 AND
S64 3'
66.3
3-1/8"
THE RULES AND REGULATIONS
CONSTRUCTION SAFETY.
CO RD 10' MIN.
NOTES:
THERETO APPURTENANT
1. THE SIGN SHALL HAVE A WHITE SCOTCHLITE
BACKGROUND WITH RED SCOTCHLINE LETTERS, EXCEPT
COMMISSION:
SHEET: CF-01OF 01
60
10/01/2024
C 2024 LANDMARK SCIENCE & ENGINEERING
FOR THE WORD "NO" WHICH SHALL HAVE THE COLOR
C1243-7
SCHEME REVERSED.
SCALE: 1"= 30'
30' MAX.
2. ALL LETTERING SHALL BE 3 INCHES IN HEIGHT, EXCEPT
50 .63'
E 2 FOR THE WORD "PARKING" WHICH SHALL BE 2 INCHES IN
GRAPHIC SCALE
'39" 8 "W
FIRE DESIGN BY: CML\RWS DATE: FILE NAME: Fire & Water.dwg
°39
CF-01
HEIGHT.
N25 105
x
.12' 3. THE SIGNS SHALL BE LOCATED AT EACH END AND 150' ON 30
8"W x
CENTER ALONG FIRE LANES.
8"W 10' MIN.
S11°11'02"E 93.10'
DRAWN BY: RWS CHECK BY: CML
4. THE SIGNS SHALL BE LOCATED NO LESS THAN 6' BUT NO
HIGHER THAN 8' ABOVE THE PAVEMENT. 15
PLAN VIEW
SCALE 1" = 30' FIRE LANE MARKING DETAIL TYPICAL FIRE LANE SIGN 0
(N.T.S.) (N.T.S.) 50
Page 51
Item 1.
CITY OF DOVER PLANNING COMMISSION
September 16, 2024 Excerpt from Meeting Minutes
The Meeting of the City of Dover Planning Commission was held on Monday, September 16,
2024, at 7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system
Webex. The Meeting Session was conducted with Chair Mr. Witham presiding. Members
present were Mr. Lewis, Mrs. Maucher, Mrs. Denney, Mr. Baldwin, Dr. Jones, Mr. Reaves, Mrs.
Welsh and Mr. Witham. Mr. Roach was absent.
Staff members present were Mrs. Dawn Melson-Williams, Ms. Katherine Oehmke, and Mrs.
Kristen Mullaney.
NEW APPLICATIONS
C-24-02 Luther Village IV: Planned Neighborhood Design - Senior Citizen Housing Option on
Babb Drive - Public Hearing and Review of a Conditional Use Site Plan/Master Plan for the
development of Luther Village Planned Neighborhood Design – Senior Citizen Housing Option
consisting of up to 524 age-restricted apartment units in a total of nine phases. The Master Plan
was previously established by Applications C-02-02 and C-13-03 and Luther Village Phases I, II,
and III have been constructed. The plan for Phase IV consists of the construction of a three-story
apartment building with 72 units (age-restricted) and associated site improvements. The plan also
includes a Minor Subdivision to create a 2.79 acre+/- parcel for Phase IV from the overall 33.63
acre +/- tract. The property is zoned RG-2 (General Residence Zone). The property is located east
side of John Hunn Brown Road and on the west side of Babb Drive. The owner of record is Martin
Luther Foundation of Dover, Inc. Property Address: 101 Babb Drive. Tax Parcels: ED-05-
077.06-02-90.00-000, ED-05-077.06-02-90.01-000, ED-05-077.06-02-90.02-000, and ED-05-
077.06-02-90.03-000. Council District 2. Consideration of Alternative Design Standards for
PND: Building Setback from Property lines, Building Spacing, Building Height, Number of
Stories, Average Number of Dwelling Units Per Building, Off-Street Parking Reduction. Waiver
Requests: Partial Elimination of Curbing, Reduction of Bicycle Parking, Elimination of Rear
Emergency Access. Subdivision Waiver Requests: Waiver of Requirement for Two Connections to
a Public Street and Waiver of Requirement for Lot Frontage on a Public Street. Associated
Applications: MI-24-06 Luther Village IV: PND-SCHO Concept Plan and C-02-02, C-13-03, S-
03-07, S-07-10, MI-13-08, C-13-03 and C-19-05.
Representative: Mr. Craig Lynch, Landmark Science and Engineering; Mr. Richard Murphy,
President of the Board for Martin Luther Foundation of Dover
Mrs. Melson-Williams stated that this application is C-24-02 Luther Village IV: Planned
Neighborhood Design – Senior Citizen Housing Option on Babb Drive. As noted by the Chair,
this is focused on Phase IV which is both a Conditional Use Site Plan and Master Plan for this
location. The opening picture was the view from Babb Drive of the complex. This location
previously has had three phases of construction over the last twenty years. For the project itself,
as shown on the aerial view, they have applications dating back to 2002 when the first concept for
development of this as a senior citizen housing complex was put forth. Since that time, three
buildings have been built including an additional activity center. The buildings are apartment units.
They are age restricted based on the type of application we are considering. The overall tract of
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 1 of 9 51
Page 52
Item 1.
land is just under 34 acres in total. The access is from Babb Drive and with each of the phases of
construction, they have placed each phase on an individual parcel of land. So with this
consideration of Phase IV, there will also be a Minor Subdivision Plan that would create that Phase
IV Lot. Overall, the Planned Neighborhood Design – Senior Citizen Housing Option as shown
here, shows a series of nine Phases. There are eight apartment buildings. In the past, it has been
approved for up to a total of five hundred twenty-four (524) dwelling units. There is also some
Activity Room Buildings that interconnect these Apartment Buildings and also a proposal for a
Town Center Building in one of the other Phases. At this point, we have a total of one hundred
forty-eight (148) dwelling units that have been constructed. Phase IV is focusing on a building that
would provide seventy-two (72) dwelling units as an apartment style building. It is in the top center
here on this image. It includes a parking lot specifically for it and is interconnected by an extension
of the loop road which runs around the outer boundary of the project site. Access as noted, is from
Babb Drive. That is in the lower left of the project area. Because it is a Planned Neighborhood
Design-Senior Citizen Housing Option, over time they have had to re-up the Master Plan and that
is one of the tasks this evening. As part of that, they are looking at a number of things overall for
the Master Plan. Our Development Advisory Committee Report did run a tally of units by phase
and parking spaces by phase. We can see here in this image of the architecture for Phase IV. It is
proposed for a three-story building in brick, continuing the architecture that we currently see there
in the complex of brick with windows on all elevations and some annotations to the roof with those
dormer styles and turned gables. Also, we can see in this image a kind of covered entry to this
specific building. With a PND – Senior Housing Option, we have to look at project density and
whether that density is compatible. The Master Plan is depicted in this submission that will give a
site density of 14.2 dwelling units per acre. That is with this Plan showing a total of 477 dwelling
units for the entire site. As part of the PND, they are also asking for a number of the design
standards to also be approved with some Alternatives. Those Alternatives deal with the
requirements for parking, the requirements related to building setbacks from property lines, the
building spacing, the number of stories and associated building height, and then the average
number of dwelling units per building. Again, our Report has outlined what the requirement is and
what they have requested. Some of these Requests are made to allow for the interconnection of
buildings which means that they are going to end up with a 0 setback from a property line. We are
also seeing them go to three stories in this instance. There are at least one of the Phases that has a
four-story building. All of that puts a lesser footprint on the ground and allows the construction to
go more vertical. Those Alternative Design Standards for the PND will have to be considered as
part of your deliberations tonight. She will note that the zoning of the property remains as is. This
would be no change to the zoning of the property which is currently zoned as RG-2 (General
Residence Zone). The RG-2 (General Residence Zone) does allow for apartments but this process
that they are moving through is a more specialized review process for its development.
Some of the other Waiver Requests associated with this project include a Waiver related to the
Rear Emergency Access requirement. That is a requirement found in the Zoning Ordinance related
to the ability to access the rear of the building. For a three-story apartment building, which means
either a sixteen (16) foot alley or an eighteen (18) foot secondary fire lane. The Planning
Commission will make a recommendation on that Waiver and then that will be forwarded onto
City Council Committee for Final Action. She will note that the Rear Emergency Access
provisions can be met through a subgrade drivable surface and that is what has been implemented
in other portions of this project. We will have to deal with that this evening. In other notes, the
parking reduction was one of those Alternative Design Standards. Basically, in the past this has
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 2 of 9 52
Page 53
Item 1.
received a Waiver for a Parking Reduction. They are asking for the parking rate to be set at 1.15
spaces per dwelling unit is a little over 1 per dwelling unit. She thinks they can hear from the
applicant a little bit more about how this facility works which is why they are seeking that
reduction. It will allow for one parking space per dwelling unit and then there is additional parking
that would be able to accommodate visitors and staff at the location. They have asked for a Waiver
related to bicycle parking. While their project is showing to be compliant in Phases III and IV,
some of the early buildings (Buildings I and II) do not include bicycle parking spaces as that wasn’t
a requirement of our Code at the time. But since we are looking at the overall Master Plan, we
have got to calculate fully the bicycle parking requirement overall. With this area for Phase IV
looking to be located on its own individual parcel, there are a couple of Subdivision Waivers that
will need to be addressed. In this case, the Planning Commission makes a Recommendation and
then City Council/Committee will actually take the Final Action. Those two waivers related to
basically creating a lot for Phase IV and result in a request for elimination of the street frontage
requirement. Our Code requires that lots have frontage on a public street and obviously Phase IV
isn’t along the frontage that this property has on Babb Drive or along John Hunn Brown Road.
Additionally, the other Requests for Waivers related to that are because of the spacing and building
setbacks. The other one that also comes at us from the Land Subdivision Regulations is that when
a complex reaches the threshold of 150 dwelling units, then a second connection to the existing
street must be shown. In the case of this project, the property has one access point that is a divided
median access onto Babb Drive. However, the second connection that would be triggered by that
150 dwelling units isn’t proposed until Phase V. In order to construct Phase IV, they will need a
Waiver of that requirement of two connections of a public street. One of the waivers, she will be
happy to report, is something that the Planning Office can grant and that is for the Partial
Elimination of Upright Curbing. That has been approved by Staff and it is related to stormwater
management and the loop road area of the project.
To wrap all of that up for you, your data pages are probably your best source of all of the series of
Waivers. First, we have the considerations of Alternative Design Standards for the PND and that
includes things related to the building setbacks, spacing and height and number of dwelling units
per building as well as an off-street Parking Reduction. The Waivers requested that the
Commission will need to act on are the Reduction of Bicycle Parking and the recommendation
related to the Elimination for Rear Emergency Access and then the Subdivision Waivers related
to two (2) Connections to a Public Street and the requirements for having a Lot with Frontage on
a Public Street. In those cases, they will be making a recommendation that will move onto City
Council. The Development Advisory Committee Report includes information from all of our other
participating agencies related to utility services, the Office of the Fire Marshal, DelDOT, and with
the Kent Conservation District also providing comments. Those are all included by reference and
then there are copies of the Waiver Request letters from the applicant.
Mr. Lynch stated that this is a mission of the Martin Luther Foundation of Dover. As Mrs. Melson-
Williams has mentioned, they have been carrying on for several decades now. Obviously, if it was
their prerogative they would build out as fast as they could, but they are not setup in that way.
They are setup for affordable housing for senior citizens in the community. There is a giant need
for this which was elaborated on at the previous (City) Council Meeting. There seemed to be a lot
of backing by Council already. To hit a couple of points for your consideration with the Waivers
and PND Considerations, a lot of the building setbacks and spacing and those issues are created
by the fact that for funding reasons and grants, the properties that are being assessed and built as
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 3 of 9 53
Page 54
Item 1.
individual units need to be on their own individual parcel. In order to eligible for grants and funding
for Phase IV, we can’t have it be on the remaining 20 plus acres of residual land. That is really a
driver for having each building be on a single phase. In keeping in the spirit that they have already
put forth in having the community sense for the residents, having those interconnected activity
areas is very important to their mission and this continues that. The connection between the two
buildings will be open on the lower level and then have an exercise room and break room on the
second and third level. So it will continue to pull in some of the outdoor amenities that they have
already established with the inside corridors that residents have in the hallways. The building
height, number of stories, and the average number of units per building are kind of tied together.
As Mrs. Melson-Williams mentioned earlier, it is in keeping with the character of the campus
already and it allows for more outdoor space and less pavement to be on the site in that regard.
Off-street parking reduction is consistent with the use and the fact that it is senior housing. A lot
of the residents are taking public transportation to wherever they need to go and with the nature of
the units, there is typically not more than one person per unit. So, that is in keeping with the parking
that has already been established on the site. As Mrs. Melson-Williams mentioned, the Planning
Office has already okayed the Partial Elimination of Upright Curbing. For the reduction in bicycle
parking, there is already bicycle parking on the site that is under-utilized. They plan to give a code
compliant bicycle parking area for this phase that they are proposing now. There was not any
previously given in Phases I and II but this, in keeping with use, is adequate to provide it in Phase
IV. Depending on certain funding allocations, there may be plans to install that for Phases I and II
as well. The Waiver requirement for two connections to a public street is kind of the one that is in
the grayest area for consideration. The Master Plan considered having two entrances by Phase IV
initially, but as you can see on the main overall Plan, the spine road that connects sort of the left
half of the site and the right half of the site will not be constructed in this Phase. You will essentially
be creating a closed loop if you install this (second) entrance. You would drive farther down Babb
Drive, take a left into the development and immediately take another left and go back towards the
first entrance and then cross that entrance again. It just might cause confusion or some other
unnecessary circumstances. That (second) entrance, in his estimation, does not fit with the
reasoning that is in the Code. He understands that with the more units, you can’t have everybody
funneling to one intersection in one entrance. This actually would not only funnel them to the same
entrance but in a roundabout way, that might be confusing or leave someone doing something that
they didn’t intend to. It was less of a want to not meet the Code but more of a desire to do something
that made more sense for the property.
Mr. Murphy stated that in regards to the bicycle parking right now, in the seven projects that they
have, they’ve got about 50% resident use of personal vehicles. So, only about 50% of our residents
have a personal vehicle. That’s why they are looking for the reduction in parking to 1.15 spaces
per unit. As mentioned on the spacing of the buildings, it is important to us that the buildings are
interconnected so that the seniors can travel and visit other seniors in another building without
having to go out into the weather. As indicated, they use a lot of public transportation and there is
a bus stop right on Babb Drive next to our entrance.
Mrs. Maucher stated that there was some notation about the Elimination of the Rear (Emergency)
Access and Staff indicated that there might be some alternatives that you could consider. Has that
been done yet? Responding to Mrs. Maucher, Mr. Lynch stated that the Plan that they have put
forth to the Commission today is Code compliant with the State Fire Code. For the additional
requirement from the City to create that rear access lane, they are speaking with the City’s Fire
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 4 of 9 54
Page 55
Item 1.
Marshal’s Office to look at some other alternatives. The one that Mrs. Melson-Williams was
mentioning is in-lieu-of a paved surface. You could put sort of stone underneath that grass can
grow through then sort of that lattice structures which they would work with the Fire Marshal’s
Office to see how they could make that work. Given how the campus is spatially and how you
could access the rear of the building without needing to put that fire lane in, they were just asking
to consider that.
Mr. Murphy stated that the other advantage to not having to put that rear access lane in, as Mr.
Lynch said, is fairly reasonable access (exists) without that. Once that fire lane is in there, we can’t
put anything on top of it because it needs to be clear for the fire trucks or other emergency vehicles.
In other words, it’s things like raised garden areas for the seniors. That’s a prime location for that
because it’s right at the rear of the building and they can exit to one of the rear entrances and go
out there to tend to their gardens and then come back in. If not, then they have to make it a little
bit more remote. As Mr. Lynch stated, it is doable but our preference would be to not have to put
that Rear Emergency Access in.
Mrs. Denney stated that she had a question related to that fire lane. Can you help her understand
the mean age of the residents in Luther Towers? Responding to Mrs. Denney, Mr. Murphy stated
that their Director has advised him that the average age is about 70.
Mrs. Denney stated that she retired a long time ago but her field was medicine. She has a great
concern when she saw the request for that Waiver. We all know the older that we get, the slower
we move. Then it’s for the more fire equipment that can pull right up to that building and get those
men helping those senior citizens get down, especially when the fire alarm goes off and you are
not allowed to use the elevator. She is thinking that from her perspective, that’s really not good
safety-wise (to eliminate). When she first read this, she thought “those things are up to the Fire
Marshal” and you should just let that sleeping dog lay but she does have a lot of concern about
that not being a fire lane. Do you have any alternative ideas? Responding to Mrs. Denney, Mr.
Lynch stated that besides paving it or putting in the stone lattice structures, there is not going to be
much that would stand up to that heavy equipment. They would be able to get in and out without
it, but it would just be up to the Martin Luther Foundation to then repair the damage.
Mrs. Denney stated that she knows that there are certain types of parkable turf. We have also seen
those. She has seen many engineers come up with some very creative ways to do parkable turf, but
we also know that fire equipment is heavy. She realizes what you are saying and as you are
answering the question and thinking that would be a good place for garden boxes, to her, she is
thinking that would be a good place to leave wide open for emergency equipment. Again, it really
gives her a great deal of concern because it is difficult for some people to get around. She is 75
and she still gets around pretty well; that does give her pause.
Mr. Witham asked what would be in the increase in terms of traffic into the community as a
consequence of constructing Phase IV? You obviously must have an experience as to what the
traffic flow is right now on the previous phases that are constructed. Responding to Mr. Witham,
Mr. Lynch stated that it is his understanding that it won’t really increase the maintenance burden.
Your maintenance staff is already top notch. From a staff perspective, he doesn’t know that it has
much of an impact, maybe one to two additional staff members. Obviously, the residents have
about a 50% vehicle rate; so, at 72 units, it would be 36 additional vehicles. The trips per day for
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 5 of 9 55
Page 56
Item 1.
this use is probably lower than your typical one who is getting up and going to work every day or
something of that nature. They are very similar in size and use. It’s probably an additional 1/3
more if you split up the first three phases. It would be similar to that.
Mr. Witham stated that he heard there was a bus stop. Is there just one bus stop for all phases and
is that enough to serve all of these residents? Responding to Mr. Witham, Mr. Murphy stated that
there are other transportation modes. They have their own bus that they use to take residents to
doctor appointments, on shopping trips, and that type of stuff. They can schedule with that van
that runs throughout the week.
Mr. Witham stated that perhaps Staff can tell him, does this type of construction with the type of
residential units that you are constructing, would this normally require a Traffic Study or not?
Responding to Mr. Witham, Mrs. Melson-Williams stated that Babb Drive is a City street as is the
immediate roads connecting to it. The project, as part of our Development Advisory Committee
does go to DelDOT and they have asked some questions about what the traffic generation is. Some
of which may have been addressed years ago when this project first came to fruition back in 2002.
But the City would not require a Traffic Impact Study. She thinks there are a number of options
once you leave this site about how you move away from it, but they will have to be working with
our colleagues at DelDOT regarding any requirements that they may have for looking at this. This
always gets a little difficult when the first street off the project site is a City street which then may
lead to a DelDOT street network. The closest DelDOT roads in this case are going to be S. Little
Creek Road and then ultimately getting to Bay Road and S. DuPont Highway connections there.
So, the initial reaction is no, the City wouldn’t require a Traffic Impact Study. They think that
probably from a DelDOT perspective, there are a lot of options before you interact with the
DelDOT street.
Mr. Witham stated that he thinks they mentioned that the average occupancy for each unit currently
at Luther Village. Is it one or one and a half? Responding to Mr. Witham, Mr. Lynch stated one.
Mr. Witham stated that it would correspond with the fact that you have a reduced need for bicycles,
motor-scooters, or other modes of transportation. Are all of the buildings going to be connected?
Responding to Mr. Witham, Mr. Murphy stated that these four will be and then the next four will
be connected when they are built. There will be no internal connector between the two fours
because the loop road will split between the two developments.
Mrs. Maucher stated that back to the Rear (Emergency) Access, you said there was alternative
access that you thought might be adequate. Is that from the front and from the side? Could you
describe that a little bit better? Responding to Mrs. Maucher, Mr. Lynch stated that his statement
was that the areas behind and to the side of the building will be accessible. They won’t be
excessively steep or made of some other material that the equipment couldn’t get to. Not
considering design alternatives, just in the absence of the fire lane itself being engineered, there is
no reason to believe that emergency equipment couldn’t get there.
Mrs. Welsh stated that you are saying there would be access but it’s not going to be paved and it’s
not going to have the lattice structure, correct? Responding to Mrs. Welsh, Mr. Lynch stated that
it wouldn’t be demarked. His comment was regarding the ability for the emergency vehicles to get
to the rear of the building in an emergency. It’s would not be hindered by any sort of landscaping
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 6 of 9 56
Page 57
Item 1.
or steep hills or anything like that, that might cause them more harm or hindrance to get to the rear
of the building.
Mrs. Welsh stated that she is still understanding that there is no substructure basically that would
support the weight of the vehicle. Responding to Mrs. Welsh, Mr. Lynch stated that close to the
building it would probably be pretty compacted by the structure of the building.
Mr. Murphy stated that you would be able to drive a fire truck there and the fireman would have
ready access to it. The thought process there is that the building is going to be fully sprinklered.
The need for them to have access for the fire truck to the back of the building is less. The
firefighters can still easily access that portion of the building to get people out it just wouldn’t have
their fire truck in the back of the building.
Mrs. Welsh stated and possibly no ladder, correct? Responding to Mrs. Welsh, Mr. Murphy stated
no, no ladder truck.
Mr. Witham opened the public hearing.
Ms. Priscilla Carter – Luther Village 101 Babb Drive Dover, DE 19901
Ms. Carter stated that she lives at 101 Babb Drive. When she (Mrs. Denney) said there were people
who were 70 years old, there are people that at 80 and 90 up in there. She just wants to make sure
she understands because she is new at this. She wants to understand how they are going to connect
this other building to get into the building. Responding to Ms. Carter, Mrs. Melson-Williams stated
that you can drive around the on loop road and the loop road right now, gets you to Building 3.
Their project would actually extend that loop road. Then there is also a connection point from
Building 3 that would connect to Building 4. It’s kind of probably at the end of one of the hallways.
Building 3 is an “L” shaped building and one of its end points would connect to Building 4. The
Phase IV would use the entrance that is currently from Babb Drive onto the property to reach the
loop road.
Mr. Witham closed the public hearing.
Mrs. Maucher stated that they need to approve the Alternative Design Standards for PND: SCHO,
correct? Responding to Mrs. Maucher, Mrs. Melson-Williams stated that is correct.
Mrs. Maucher moved to recommend approval to City Council for C-24-02 Luther Village IV:
Planned Neighborhood Design - Senior Citizen Housing Option on Babb Drive inclusive of the
three sub-bullets which are the reduction in building setbacks, building spacing reduced to
accommodate enclosed connections, and the increase in building height, number of stories, and
average number of units. She would also recommend approval of the Request for Reduction in
Parking, approval of the Reduction of Bicycle Parking, and to include the Waiver Request for the
Elimination the Requirement for Two Connections to a public Street, and also finally the Waiver
Request for the Street Frontage for the Parcel.
She understands that there is some angst about the rear access. She’s not sure if that one needs to
be pulled out and voted on separately. Responding to Mrs. Maucher, Mrs. Melson-Williams stated
that it is up to her, if she wants to include that in the overall motion or if she wants to act on that
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 7 of 9 57
Page 58
Item 1.
separately.
Mrs. Maucher stated that she would prefer to act on that separately.
Mrs. Melson-Williams stated that Mrs. Maucher ran through all of the Waiver Requests but in
regards to the Conditional Use Site Plan/Master Plan for Phase IV and this project, what action are
you suggesting? Responding to Mrs. Melson-Williams, Mrs. Maucher stated that she recommends
approval of that.
Mr. Witham asked for clarification on what they are removing from the motion to be for separate
consideration. Responding to Mr. Witham, Mrs. Maucher stated that she wanted to pull out the
Elimination of Emergency Rear Access and vote on it separately.
Mrs. Maucher moved to recommend approval to City Council for C-24-02 Luther Village IV:
Planned Neighborhood Design - Senior Citizen Housing Option on Babb Drive inclusive of the
three sub-bullets which are the reduction in building setbacks, building spacing reduced to
accommodate enclosed connections, and the increase in building height number of stories, and
average number of units. She would also recommend approval of the Request for Reduction in
Parking, approval of the Reduction of Bicycle Parking, and to include the Waiver Request for the
Elimination the Requirement for Two Connections to a public street, and also finally the Waiver
Request for the street frontage for the Parcel, and to remove the Waiver for the Elimination of
Emergency Rear Access in order to vote on it separately, seconded by Mrs. Denney and the motion
was carried 8-0 by roll call vote with Mr. Roach absent. Mrs. Maucher voting yes; based on DAC
comments in the Staff Report and also recognizing the urgent and desperate need for this sort of
housing in the City. Mr. Lewis voting yes; thank you to the applicant for being here and presenting
what you are doing and the progress that is being made already. Mrs. Denney voting yes; this
project is one that we need more and more of in our community. She thinks that it is a good plan
overall despite her feelings about the back which is not included in this (motion). Mr. Baldwin
voting yes; based on the aforementioned statements. Dr. Jones voting yes; she would just like to
say that those are wonderful facilities. She has been to several events there. Very well designed
and very well kept; so, thank you so much for all of your efforts. Mr. Reaves voting yes; for reasons
previously stated. Mrs. Welsh voting yes; she agrees with some previous comments by Dr. Jones.
It seems to be a well thought-out design. It is definitely a needed residential area for the area. She
believes that the designer did a great job with the presentation and the design of the facility. All in
all, it is a very favorable addition to the community. Mr. Witham voting yes; based on the DAC
comments and both the oral presentation by Staff tonight as well as the written presentation to the
Commission in the documents themselves. It seems to him that this is a great movement forward
given the fact that we have a desperate need for this type of housing in this community. He does
want to point out that although he supports the motion itself, there are remaining questions that
have to be considered by the applicant as they go forward.
Mrs. Maucher moved to approve the Request for the Elimination of Rear Emergency Access for
the apartments and that it be approved based on DAC comments and the Staff Report.
Mr. Witham stated that the Staff Report doesn’t indicate that (meaning approval). It recommends
the additional discussion with the City’s Fire Marshal. Responding to Mr. Witham, Mrs. Maucher
stated that based on the Staff Report and the oral discussion from the applicant this evening about
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 8 of 9 58
Page 59
Item 1.
access and consideration, she will vote that it be approved.
Mrs. Welsh stated that she would like to clarify if she understands the motion. Responding to Mrs.
Welsh, Mrs. Maucher stated that the motion is to approve the Waiver Request for the Rear
(Emergency) Access. She would think that if the motion was to deny it and that was approved,
then she thinks there would have to be another vote.
Mrs. Welsh asked if she is saying to approve it in accordance with the DAC comments as well as
the presentation from the applicant this evening. She read the DAC comments to say “further
discussion with the Fire Marshal.” So that is what you are saying, is that you are encouraging
further discussion with the Fire Marshal’s Office; is that correct? Responding to Mrs. Welsh, Mrs.
Maucher stated no, the motion is to approve the Waiver Request.
Mr. Witham asked if it would be more appropriate to defer action until after there is discussion
with the Fire Marshal. Would you be willing to amend your motion? Responding to Mr. Witham,
Mrs. Maucher stated that is a fine idea. We could table action on this Waiver Request until the
next meeting if that is sufficient time for the applicant.
Mrs. Maucher moved to defer consideration of the Waiver Request for the Elimination of the Rear
Emergency Access until the Planning Commission Meeting of October, seconded by Mrs. Welsh
and the motion was carried 8-0 by roll call vote with Mr. Roach absent. Mrs. Maucher voting yes;
just to allow the applicant and the Fire Marshal to have further discussion about that Rear Access.
It is a concern. She pulled out that Waiver Request because she didn’t want to see the full
application fail in the event that something couldn’t be done. Mr. Lewis voting yes; having said
that and knowing that he will be out of the country for the next meeting, when you say that it was
doable to do it, he would lean on doing it. You build these things with the hope that you never have
to use them. He is in favor of having it. Mrs. Denney voting yes; she would like to hear more
information from the Fire Marshal’s Office. As she thinks everyone understands, her fear is that
trying to get that many seniors out of the building. Suppose the fire is towards the front of the
building and they have to get out from the back. Frankly, in her history of medicine and dealing
with many, many seniors, kitchen fires happen. Put a pot on the stove and go to the bathroom and
then think, “I meant to get this out of the closet.” The first thing you know is a fire happens.
Sprinklers are great but they don’t move people and they don’t separate the smoke from the people.
Again, we are talking about seniors. Mr. Baldwin voting yes. Dr. Jones voting yes; due to concerns
that have already been expressed by other Commissioners. Mr. Reaves voting yes; until the next
meeting. Mrs. Welsh voting yes; hoping that a solution will be worked out that will be safety
conscious for everyone’s concerns. As Mr. Murphy said, we don’t want to have to use it but that
is something that there needs to be there as a safety factor just in case we ever do need it. Mr.
Witham voting yes; based upon the comments of the Commissioners and based upon the
recommendations of Staff and the written comments.
Excerpt of Planning Commission Meeting Minutes of September 16, 2024 Page 9 of 9 59
Page 60
Item 2.
Dover Freight Plan
Presentation to Council
Committee of the Whole
October 29, 2024
60
1
Page 63
Agenda Item 2.
• Background
• Importance of local freight planning
• Objectives
• Prior plans and studies
• Recent and ongoing freight-related planning and development
• Preliminary recommendations
• Next steps
63
4
Page 64
Background Item 2.
• Delaware State Freight Plan
• Statewide freight plans required by FHWA
• 2022 plan recommended DelDOT undertake local freight planning
support initiatives
64
5
Page 65
Importance of local freight planning Item 2.
• Helps identify and address local freight movement
concerns of both freight operators and residents
• DelDOT’s local freight planning support helps to integrate
local freight issues with state goals and projects and to
secure federal funding to address those issues
• Freight is important to the local economy: 36% of
employees in Kent County work in a Freight-Intensive
Sector (Delaware State Freight Plan)
• Freight movement patterns have shifted due to the
growth of e-commerce
• Has brought more delivery trucks into residential areas
• Increased demand for logistics sites in/near urban areas
to meet quick delivery timeframes Truck parked in the shoulder on White
Oak Road near Garrison Oak Drive
65
6
Page 66
Objectives Item 2.
1. Increase collaboration among government
and industry stakeholders to address
freight issues and concerns
2. Build upon previous freight planning efforts
3. Identify freight movement issues and
develop recommendations to help protect,
manage, and accommodate freight activity
in Dover
66
7
Page 67
Recent & ongoing efforts Item 2.
• February 2024: City Council
approved revisions to city-
designated truck routes
• August 2024: New DAFB Joint
Use Agreement signed
• Ongoing:
• Leasing out of sites at Garrison Oak
Business and Technology Center
• Construction of East Camden
Bypass
• Phase 2 of the Kent County
East/West Truck Freight Routes
Study
67
8
Page 68
Item 2.
Preliminary
Recommendations
68
9
Page 69
1. Development regulations & review Item 2.
Recommendation 1A: Truck parking
requirements
• Adopt development regulations
requiring developers to provide truck
parking/staging as part of
manufacturing, warehouse, and
logistics developments
• Responsible party: City of Dover
• See next slides for examples from Lehigh
Valley area of PA
• Note that this recommendation does not
include specific numbers. Specific
Example of a truck parking lot
numbers would likely differ from the
Lehigh Valley examples 69
Page 70
Truck parking requirements example Item 2.
Township of Upper Macungie, PA
Municipal Code Section 27-601 Required Number of Parking Spaces
[Ord. 9-94, 4/7/1994, § 601; amended by Ord. 2017-4, 6/1/2017; and by Ord.
No. 2020-08, 7/9/2020]
Excerpt Table 6.1: Off-Street Parking Requirements
Use Number of Off-Street
Parking Spaces Required
E. Industrial Uses …plus one (1) ten-foot by
eighty-foot (10' x 80') truck
All industrial uses (including staging parking space for
warehousing, distribution, truck every two (2) loading
terminals and manufacturing) docks
70
11
Page 71
1. Development regulations & review Item 2.
Recommendation 1B:
Freight considerations
checklist
• Incorporate freight-
specific planning
considerations checklist
(like the one developed
by CPCS for
WILMAPCO) into
development review
processes
• Responsible parties:
Development review
entities at all
government levels
71
Page 72
2. Land use planning Item 2.
Recommendation 2A: Protect existing freight-intensive development opportunities
along truck routes
• Preserve opportunities for freight-intensive development in appropriate locations by
protecting parcels currently zoned for freight-generating uses along Dover’s existing and
future truck routes from rezoning
• Responsible parties: City of Dover and Kent County
Recommendation 2B: Create opportunities for freight-intensive development along
Dover’s truck routes
• Create opportunities for freight-intensive development in appropriate locations by pursuing
rezoning for suitable parcels not presently zoned for freight-intensive uses along Dover’s
existing and future truck routes
• Draw on Dover/Kent MPO’s 2022 Rail Corridor Industrial Land Use Study for guidance on
rezoning for freight-intensive uses
• Responsible parties: City of Dover and Kent County
72
13
Page 73
3. Communication & coordination Item 2.
Recommendation 3A: Intergovernmental coordination
• Improve communication/coordination between local,
county, and state government and MPO regarding
freight-related land development and transportation
projects
• To ensure awareness of proposed projects that will affect
freight movement
• Collect and share freight-relevant data from land development
and transportation improvement projects
• “Dig Once” policy to ensure that relevant freight Example of tractor trailer’s wide turning
recommendations are implemented when road work is occurring radius
• Responsible parties: City of Dover, Kent County, State of
Delaware
73
14
Page 74
3. Communication & coordination Item 2.
Recommendation 3B: Stakeholder coordination
• Improve engagement with local freight operators to
better address their needs during planning processes
• Responsible parties: City of Dover, Kent County, State of
Delaware
Recommendation 3C: Revisit Dover Air Cargo
Freight Access Study recommendations
• Revisit the Dover Air Cargo Freight Access Study –
Planning and Environmental Linkage (PEL) Report
(2021) to determine if recommendations need to be
adjusted based on leasing activity at Garrison Oak
Business and Technology Center
• Responsible parties: Dover/Kent MPO, City of Dover,
Kent County, State of Delaware 15
74
Page 75
Planned improvements Item 2.
• CTP project: Garrison Oak
Connector Road (SR 1 via
White Oak Road)
• Preliminary engineering starting in
FY25
• Project description: New connector
two-lane road between White Oak
Road and N. Little Creek Road
• This is Phase 1 of a 2-phase
project
• Phase 2 (as described in Dover Air
Cargo Freight Access Study):
Connector road between N. Little
Creek Rd and S. Little Creek Rd
75
16
Page 76
Discussion/feedback Item 2.
• Suggestions for changes, additional recommendations/issues to
address?
• Information and survey:
• These slides and the boards are posted on the project website
• We welcome feedback via the online survey (hard copies also available)
• Available online at www.publicinput.com/doverfreight or scan
• The survey will be open through November 29
• Please share with any interested constituents
76
17
Page 77
Item 2.
Next Steps
77
18
Page 78
Next steps Item 2.
Task Anticipated timeframe
Public survey Oct. 29–Nov. 29, 2024
Refine recommendations December 2024
Presentation to Council Committee of the Whole – December 2024
Transportation and Safety Committee
DelDOT review of draft report December 2024
Dover review of draft report January 2025
Present draft report to City Council January 2025
Finalize report February 2025
78
19
Page 79
Thank you! Item 2.
Cooper Bowers, DelDOT Marilyn Smith, Dover Kent MPO
Cooper.Bowers@delaware.gov Marilyn.Smith@doverkentmpo.org
302-760-2153 302-387-6030
Leah Kacanda, WRA
lkacanda@wrallp.com
302-778-9056
79
20
Page 80
Item 1.
CITY OF DOVER, DELAWARE
ACTION FORM
PROCEEDING: Council Committee of the Whole (Utility Committee)
DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: October 18, 2024
PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
REVIEWED BY: David S. Hugg, III City Manager and Patricia Marney, Interim Controller / Treasurer
SUBJECT: Evaluation of Bids – Persimmon Park Place Drainage Basin Improvements
TIMETABLE: Notice to proceed to be issued within thirty (30) days of Council approval. Project
anticipated to be completed in two hundred and forty (240) calendar days from
issuance of Notice to Proceed, weather permitting.
RELATED PROJECT: X
REFERENCE: CIP- Stormwater Projects
EXPENDITURE REQUIRED: $1,198,025
AMOUNT BUDGETED: $1,200,000
FUNDING SOURCE (Dept./Page in CIP & Budget): Department of Public Works – Stormwater
Division- SW2303 Persimmon Park Place
Drainage Basin Improvements Account No.:
101-12-18-60-000-54031.
STAFF RECOMMENDATION:
Award contract to Gateway Construction, Inc. for the Persimmon Park Place Drainage Basin
Improvements, ITB #25-0006WW, for $1,198,025.
BACKGROUND AND ANALYSIS:
This project was initiated by the development constituents. Significant drainage issues occur throughout
the Persimmon Park Place Development. Studies have been completed by consulting firms that indicate
the existing infrastructure is not sufficient for proper drainage. This project will provide improved capacity
and conveyance of stormwater in this area. Failure to improve this system could result in a future failure
of the infrastructure and property damage.
The bid was advertised to the public as an Invitation to Bid in accordance with the City’s purchasing
policy by the City’s Purchasing Agent under ITB #25-0006WW. Bids were opened on October 10, 2024.
The City of Dover received three (3) responsive bids. The three (3) responsive bids are shown in the table
below:
80
Page 81
Item 1.
EVALUATED
CONTRACTOR LOCATION BASE BID
PRICE
GATEWAY CONSTRUCTION, INC. HARTLY, DE $1,198,026.00 $1,198,025.00
GEORGE & LYNCH, INC. DOVER, DE $1,596,720.65 $1,548,819.03*
TEAL CONSTRUCTION, INC. DOVER, DE $1,360,499.00 $1,319,684.03*
*George & Lynch, Inc. and Teal Construction, Inc. were awarded a three percent (3%) reduction due to
local vendor preference.
City staff reviewed the submissions and found that Gateway Construction, Inc. bid met all requirements
for the qualifications of the project. Staff recommends awarding the contract to Gateway Construction,
Inc. in the amount of $1,198,025 for the Persimmon Park Place Drainage Basin Improvements Project.
81
Page 83
Item 4.
COUNCIL
DASHBOARD
10/29/2024
83
Page 84
Item 4.
REQUEST
On 08/14/2024, a request was received
from Council President Anderson to improve
communications and provide status reports
in real time on constituent issues.
84
Council Dashboard 10/29/2024 2
Page 85
Item 4.
SOLUTION
Utilization of the Esri ArcGIS Solution called
Citizen Problem Reporter.
This application has been customized by the
GIS Division of Public Works for the internal
use by various Departments for the past
year and a half. (Not public facing.)
85
Council Dashboard 10/29/2024 3
Page 86
Item 4.
Reporting of constituent issues
upon receipt.
Immediate assignment of issue
BENEFITS to the appropriate City
Department.
Real time status of progress by
the Department representative.
86
10/29/2024 Council Dashboard 4
Page 87
Item 4.
Information provided is only as
good as the accuracy of those
LIMITATIONS entering it. (This is no different
than any current method
utilized.)
87
10/29/2024 Council Dashboard 5
Page 88
Item 4.
This application is not to be This application will not
used for emergencies. contain information that is
non-public from a FOIA
Life Safety: Call 911
standpoint. This would
Utility Emergencies: Call include account data or code
System Operations at 302-736- enforcement case details.
7086, Option 3
GUIDELINES
88
Council Dashboard 10/29/2024 6
Page 89
Item 4.
As this is a geospatial solution,
the constituent issue must be
known but also the location.
The location information that
can be utilized includes closest
address, closest intersection,
number of houses away from
an intersection or closest
business (for larger
businesses).
INFORMATION REQUIRED
89
Council Dashboard 10/29/2024 7
Page 90
Item 4.
D e p a r tm ent of Pl a nning & Insp e ctions
The Departments ( C o d e E n f o r ce me nt)
participating include D e p a r tm en t o f Pu b l ic Wo r k s ( Sa n i tatio n,
Sto r m wa te r, Str e e ts )
those that are most
D e p a r tm en t o f Wa te r & Wa s te water
frequently involved in ( Wa te r, Wa ste water )
resolving constituent E l e ctric D e p a r tme nt
issues received through Pa r k s & Re cr e a tion D e p a r tm en t
( G r o u n d s , Re cr e a tion )
City Council.
Pol ice D e p a r tm ent
PARTICIPATING DEPARTMENTS
90
Council Dashboard 10/29/2024 8
Page 91
Item 4.
CONSTITUENT ENTER
ISSUE INFORMATION
WORKFLOW
STAFF ASSIGN TO
ADDRESS STAFF Council ability to
view status once
assigned to staff.
STATUS
COMPLETION
UPDATES
91
Council Dashboard 10/29/2024 9
Page 92
Item 4.
THE SOLUTION VISUALIZED
(ESTIMATED GO LIVE 11/12/2024)
92
Page 93
Item 4.
City Council Layer
Selection Screen
93
10/29/2024 Council Dashboard 11
Page 94
Item 4.
Problem Selection
Screen
94
10/29/2024 Council Dashboard 12
Page 95
Overall Dashboard Item 4.
95
10/29/2024 Council Dashboard 13
Page 96
Item 4.
Status Progress
Screen #1
96
10/29/2024 Council Dashboard 14
Page 97
Item 4.
Status Progress
Screen #2
97
10/29/2024 Council Dashboard 15
Page 98
Item 4.
Status Progress
Screen #3
98
10/29/2024 Council Dashboard 16
Page 99
Reported Problems Dashboard Item 4.
99
10/29/2024 Council Dashboard 17
Page 100
Item 4.
THANK YOU
Special thanks to Mike
Walker, GIS Manager, and
Mark Nowak, Public Works
Director, for their efforts on
this project.
100
Council Dashboard 10/29/2024 18
Page 101
Item 5.
City of Dover
MAYOR AND COUNCIL
PROPOSED COUNCIL RESOLUTION NO. 2024-15
A RESOLUTION CREATING ECONOMIC AND COMMUNITY DEVELOPMENT
FUNDS
WHEREAS, the Mayor and City Council seek to set aside funds for economic
development and community development-related projects to include opportunities to improve the
city’s economy and quality of life; and
WHEREAS, the funds shall fall under the managerial control of the Controller/Treasurer
who shall regularly report on the status of the funds; and
WHEREAS, the purpose of the Economic and Community Development funds will be for
the use of programs, policies, or activities that seek to improve the economic well-being and
quality of life for the residents of the City of Dover; and
WHEREAS, funds could be used for land or building acquisition, building renovation,
matching funds for related grants, incentives associated with new or expanded businesses, upfront
and administrative costs associated with the issuance of conduit or TIF bonds, blight removal, or
other purposes consistent with economic or community development projects; and
WHEREAS, an economic development project will constitute a program or activity
having the primary purpose of encouraging the establishment and growth of business in the city,
including the creation and retention of jobs; and
WHEREAS, a community development project means a project or process for making the
community a better place to live, play, and work; and
WHEREAS, the initial funding source will come from the proceeds of the sale of property
(lots) at the Garrison Oak Business and Technology Park; and
WHEREAS, the initial deposit is to not exceed the amount of $5,000,000 in each fund or
as directed by the City Council; and
WHEREAS, the funds may receive all or part of the proceeds from future land or building
sales, budget allocation, gifts and bequeaths, or other sources; and
WHEREAS, each fund shall be capped at $10,000,000. All receipts more than the
maximum shall be deposited in the General Fund balance to be used as directed by the City
Council; and
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 101
Page 102
COUNCIL RESOLUTION NO. 2024-15 PAGE 2
Item 5.
NOW THEREFORE BE IT RESOLVED:
The City Council does hereby create Economic and Community Development Funds within the
City of Dover, Delaware, subject to the following stipulations and conditions:
1. The Economic Development Fund resources and approval of uses thereof, shall be
subject to review by the City Council’s Legislative, Finance, and Administration
Committee with final approval by both the Chair of said Committee and the City
Manager; and
2. The Community Development Fund resources and approval of uses thereof shall
be subject to review by the City Council’s Parks, Recreation, and Community
Development Committee with final approval by both the Chair of said Committee
and the City Manager; and
3. Transfers from the funds for ordinary operating budget expenses shall only be by
a majority vote of the City Council, and only when critical to the city’s financial
condition; and
4. The funds can be used to match other sources of funds, regardless of source, if such
use of matching funds is not otherwise restricted by the grantor.
ADOPTED:
_______________________________ ______________________________
ROBIN R. CHRISTIANSEN DAVID L. ANDERSON
MAYOR COUNCIL PRESIDENT
Actions History
10/29/2024 – Introduction – Council Committee of the Whole/Legislative, Finance, and
Administration Committee
102