Skip to main content
AskDover

Historic District Commission Meeting Packet

Historic District Commission. Feb 20, 2025.

Open the PDF

This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.

3 pages have little or no readable text here, often scans or drawings. See the PDF for those.

Page 1

CITY OF DOVER, DELAWARE HISTORIC DISTRICT COMMISSION MEETING Thursday, February 20, 2025 at 3:30 PM City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware AGENDA IN-PERSON and VIRTUAL MEETING NOTICE The Historic District Commission Meeting for Thursday, February 20, 2025 will be held as an In-Person Meeting at the City Council Chambers. The public is welcome to attend in person. The Meeting will also be provided as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic means of communication. See the participation information below to join by phone or computer. PUBLIC PARTICIPATION INFORMATION City of Dover Historic District Commission Meeting of February 20, 2025 Join by Phone: Dial 1-650-479-3208 Access code: 253 918 48192 Password from Phones: 36837432 Join Online: https://bit.ly/HDCMeeting2202025 Webinar Password: DoverHDC Webinar Address: 2539 184 8192 If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196. WELCOME ROLL CALL APPROVAL OF AGENDA APPROVAL OF MINUTES 1. Adoption of Minutes of December 19, 2024 COMMUNICATIONS & REPORTS Summary of Activity 1

Page 2

HISTORIC DISTRICT COMMISSION MEETING - February 20, 2025 PAGE 2 2. Summary of Applications 2024 3. Summary of Architectural Review Certificates for 2024 and 2025 Department of Planning & Inspections Updates NEW APPLICATIONS 4. HI-25-01 The Old Post at 55 Loockerman Plaza - Public Hearing and Review for Recommendation on Architectural Review Certification for redevelopment of the Old Dover Post Office property consisting of 1.267 acres for a mixed-use project known as The Old Post. The project involves the demolition of the rear warehouse portion of the existing building and adaptive re-use of the front 4,560 SF portion of the building for commercial retail and business space. A three-story 31,500 SF building addition is proposed for thirty-six (36) residential apartment units and with parking and other site improvements. The property is zone C-2 (Central Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone), and subject to the H (Historic District Zone). The property is located on the north side of Loockerman Plaza and adjacent to Innovation Way. The owner of record is the City of Dover and equitable owner is Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05-077.05-04-53.00-000. Council District 4. NEW BUSINESS Review of Permits Referred to Commission OLD BUSINESS Certified Local Government (CLG) Program Implementation of 2019 Comprehensive Plan ADJOURN Posted: February 11, 2025 THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING 2

Page 3

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 The Meeting of the City of Dover Historic District Commission was held on Thursday, December 19, 2024, at 3:30 PM as an In-Person meeting in the City Hall Council Chambers (anchor location) and virtually using the videoconferencing system Webex. With Chairman Czerwinski presiding, the other members present were Ms. Horsey, Mrs. Richardson, and Mrs. Mason. (There is currently one member not appointed.) Planning Office Staff members present were Mrs. Melson-Williams, Mrs. Duca, and Mrs. Savage- Purnell. APPROVAL OF AGENDA Ms. Horsey moved for approval of the agenda as presented, seconded by Mrs. Mason, and the vote was unanimously carried 4-0. ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION MEETING OF OCTOBER 17, 2024 Ms. Horsey moved for approval of the Meeting Minutes of October 17, 2024, with any necessary corrections, seconded by Mrs. Richardson, and approved 4-0. COMMUNICATIONS & REPORTS Summary of Applications for 2023 and 2024 Mrs. Melson-Williams mentioned that for 2023, this Board considered a total of five (5) applications. I don't believe there's really been any changes for most of those projects from 2023 as many have actually already been completed. The one (1) that is still underway is related to a property that's in proximity to the Kent County Family Courthouse project which is well underway at this point as well. For 2024, today we'll be looking at Application number nine (9) for this year. A number of those are in various stages of implementation at this point. Perhaps the biggest changes to Report to you is the Legislative Hall Parking Garage. The Board looked at the Application back in May. The Application went through its Review Process with the Planning Commission. We are working with the applicants on their Check Print submissions to finalize that Plan. Application HI-24-05 which was for the Demolition of the Building at 120 South Governor's Avenue; that demolition is complete. From your last meeting of the Commission, you looked at the HI-24-07, Legislative Hall Building Addition. That Application was reviewed by the Planning Commission in November and granted a conditional approval along with the Architectural Review Certification for that project. At the October meeting, you looked at HI-24- 08. That Application was for the renovations to the house on 21 North American Avenue. We did receive updated Plans for that project in concurrence with the discussion that you all had regarding that project. We will be working to finalize their Permit and then as noted, we'll be dealing with your ninth Application today. Mrs. Melson-Williams asked if there were any questions; there were none. Summary of Architectural Review Certifications for 2024 3

Page 4

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 Mrs. Melson-Williams stated that there were some small changes since activity in October and November have now been added to that. Overall, there have been a total of 28 Applications in the Historic District area. There were most recently added another Roof Permit and a Window Permit. For the most part, these Permit Applications are reviewed by Planning Staff. Staff has reviewed 25 and there were 3 that involved the Historic District Commission in some way. So again, another way of just tracking permit activity in the district. Sign Permits seems to be the greatest in number followed closely by Roof Permits this year and then also with some building exterior projects. Just a reminder that this list also includes Building Interior Permits for tracking. However, they are not subject to Architectural Review Certification for interior work. Mrs. Melson-Williams asked if there were any questions; there were none. Department of Planning & Inspections Updates Mrs. Melson-Williams noted a reminder that City Offices are closed on Christmas Day and New Year's Day for those holidays. Other than that, City Offices are open. The remaining days around those we may have fewer Staff around, but we are open. And as always, there are a number of Staff positions that are open both in our Department and citywide. If you have someone in mind or may be interested in any of those positions, check out the city's website for information on jobs that are currently posted. NEW APPLICATION HI-24-09 Dover Mobility Center Garage at 133 S. Governors Avenue – Public Hearing and Review for Recommendation on Architectural Review Certification for construction of a four story, 400-space multi-purpose parking garage structure to be known as the Dover Mobility Center Garage. The subject site involves six parcels in the block between S. Governors Avenue and S. Bradford Street north of Minor Street Alley. The properties are zoned C-2 (Central Commercial Zone) and subject to the H (Historic District Zone). The owners of record are the Downtown Dover Partnership, City of Dover, Capital City Transformation Alliance, and CEI Properties LLC. Property Addresses: 133 S. Governors Avenue, 139 S. Governors Avenue, 145 S. Governors Avenue, 136 S. Bradford Street, 148 S. Bradford Street, and 150 S. Bradford Street, Dover. Tax Parcels: ED-05-077.09-02-10.00-000, ED-05-077.09-02-09.00-000, ED-05- 077.09-02-08.00-000, ED-05-077.09-02-24.00-000, ED-05-077.09-02-25.00-00, and ED-05- 077.09-02-27.00-000. Council District 4. Mrs. Melson-Williams stated that of note, there are two sheets that were placed on the desks of Commission members that update two of the sheets that were originally submitted by the Applicant and included in your meeting packet. We'll hear from them in a little more detail and an explanation of those two sheets. I think they are provided in response to some of the review comments found in the Staff Report. Once we hear from the Applicant, there is a time for public hearing. It is a Parking Garage project. There are a series of parcels located on the 100 block of Governors Avenue and 100 block of Bradford Street that are involved in this project. On the screen, it shows the properties that are involved. It's basically in the block just to the north of Loockerman Street north of the Minor Street Alley. It's a series of parcels that span between South Governors Avenue and South Bradford Street. The subject site is bisected by what is currently an alley. That alley is moving through an Alley Abandonment process and received a recommendation to approve the Abandonment by the Planning Commission earlier this week that 2 4

Page 5

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 will move on to City Council’s Utility Committee to be considered in the new year. So basically, we're looking at a property area that's currently made up of a number of surface parking areas and two residential style buildings that are used as offices that were previously authorized for Demolition through earlier procedures this summer. What's proposed is a Mobility Center Parking Garage structure. The image on the screen shows the basic layout of the first floor of the structure. It allows entry from both South Governors Avenue and South Bradford Street beginning with parking areas on the first level moving up through a ramp system for the garage. The first level also has a number of other amenities including a welcome center, a bike shop, and also bicycle parking areas. With this property being zoned C-2 (Central Commercial Zone), the use as a parking garage and those other amenities are uses that are allowed. Because the property is within the Historic District, the project must receive Architectural Review Certification, noting that it is in compliance with the Design Standards and Guidelines for the City of Dover Historic District Zone. The project proposal in short is this parking garage structure ranging from basically four to five stories depending on how you count the ramped areas of the parking levels. Adjacent to the building, the sidewalk areas on South Bradford Street and South Governors Avenue will be improved. There are proposed tree plantings and landscaping in those areas as there may need to be some adjustment to existing street trees. Immediately to the north of the building, there's a concept for a pocket park where some existing trees may remain, and it may also be an area that's needed for stormwater management. From a zoning perspective, it is C-2 and the use is allowed. The Design Standards and Guidelines has a whole section in Chapter 4 that focuses on new construction. There are a number of considerations that need to be given to new construction in the Historic District. Those are listed in the Staff Review Report specifically. Beginning on page 7 of the Staff Report, there are a series of Staff Comments and Recommendations. Staff is recommending conditional approval of the Architectural Review Certificate for the project, and our findings are given there. We do in our series of comments suggest some things to be clarified or conditions of that approval. We can certainly discuss those in more detail later. I think the Applicant is probably going to address some of those questions as part of their presentation. Basically, today you're looking at the architecture of the building and you are providing a Recommendation in regard to the Architecture Review Certification. Your Recommendation will move forward to the Planning Commission with the Site Development Plan for this project. As part of that Site Development Plan Review, the Planning Commission will take final action on the Architectural Review Certification for the project as specified in the Zoning Ordinance. I do want to note for the Historic District Commission and the Applicants and members of the public that the Staff Review Report was initially prepared by the Rossi Group under a Planning Services contract that we have with them at the present time given staffing levels. However, the Report was completed with additional review and editing by the Planning Office. Representative: Mr. J.D. Bartlett, EDiS Company, Ms. Diane Laird, Executive Director, Mr. Michael Caine, Core States Group, and other members of the Project Team. Mr. Bartlett stated that he was a lifelong resident of Kent County, and he resides within 10 miles of the hearing today. I'm here representing my client the Downtown Dover Partnership, who owns and/or controls the parcels noted in the summary you just heard related to this Application. We're here today, and this is for the public. I know the Commissioners are aware of this. We are here today seeking Architectural Review Certificate from the Commission in order for us to move forward with further approvals that would be necessary to get to the point where we could 3 5

Page 6

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 apply for a Building Permit. So, that’s the purpose today. Here representing the Downtown Dover Partnership is Mr. Todd Stonesifer, Board Chair; Ms. Diane Laird, the Executive Director; Mr. Ken Anderson, the Property Development Director; and members of the Design Build Team. Also, Mr. Michael Caine from the Core States Group is the Architect of record; Jed Hatfield with Colonial Parking; and Ms. Monika Micute from EDIS. I did want to take a moment to note that regarding the Building Code and, the Fire Marshal’s Fire Code requirements noted in the Staff Comments, we take that very seriously. Which is why our teams has already held initial meetings with the City Planning Staff, the Fire Marshal, as well as the Division of Water and Wastewater regarding the applicable Code requirements necessary for the project. Before the architect takes a moment to dive into the rationale and thought behind the design and the concept before you, I just wanted to give Diane Laird an opportunity to talk to the collective effort of the Downtown Dover Partnership that led us to this Application today. I am Diane Laird, the Executive Director with Downtown Dover Partnership. By way of little background, I've been engaged with the Main Street program in Dover since 1998 as I was working with the State at the time. It's been my privilege to be involved with the DDP since 2018 when I was hired as the Executive Director. It's also been my privilege to be involved with the DDP (Downtown Dover Partnership) as they planned to create a Master Plan. We together encompassed a lot of people to move forward, to create a Plan for Downtown with strategies that will provide a solid and sustainable future for the capital city. Discussion around creating a plan began before COVID in 2020 and those discussions resulted in circulating an RFP (Request for Proposal) to select the most qualified team to lead a master planning process. Mosaic Development Partners was selected in January of 2022 and the process began. Over 800 members of the community, including individuals, nonprofits, public, and private entities, were engaged through surveys, leader groups, and one-on-one interviews. This input was then coupled with best practices known and implemented by Mosaic and their team, and the final Comprehensive Master Plan emerged the following year. Since that Plan came to be in 2023, we've continued to invite community feedback and engage with the public on recommendations in the Plan and implementation of recommendations in the Plan, particularly regarding several of DDP priority projects that we believe will be the catalyst for additional private investment and redevelopment. This will begin to spur a transformation of Downtown into a thriving center of business, recreation, and living. We're excited to meet with you today to share the team's concept for our priority project number one, the Mobility Center, that will provide for various transportation options for the entire community and will also provide essential and the foundational infrastructure required for an increased number of residents, workers, and visitors for years to come. Mosaic Development Partners was also selected through an RFP (Request for Proposal) process to act as developer on the project. I'm happy to introduce to you now the team's project architect Michael Caine, who will tell you more about the design concepts for the Mobility Center. Slide Presentation Hello everyone, happy holidays. I am Michael Caine the Design Manager at Core States Group, formerly known as Bernardon. We were co-authors of the Downtown Dover Partnership’s Capital City 2030 Master Plan, and we are excited to continue work within the Downtown to help revitalize and create the next chapter of your Downtown. Dawn had a great introduction to 4 6

Page 7

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 our sites so I will not rehash what the Staff has reported. I'll just sort of pick up where she left off just for the sake of everyone's time. One thing as we look at the Site Plan, we really wanted to make sure that the public is included in our site in as many ways as possible. With that we've really made sure that everything we designed is with the public in mind and the best for your Downtown District. If I can have the next slide, please. So, with this before we even started, we did an in-depth analysis of not only your Guidelines but what Dover’s architectural fabric looks like. We surveyed and looked at nearly every brick building within a three-mile radius of the Downtown District to make sure everything we design compliments and reflects rather than replicates your history. Within your Guidelines, it was important for us to make sure that we didn't provide an artificial history of your Downtown. We wanted to create something authentically Dover, but not reflect replacements already there. We had an Open House on October 23, 2024. I believe I've seen a few of you guys there. We wanted to make sure that we provided an early design concept to the public to get buy in before we produced anything for your Council to review or Commissions to review. With that we created a palette in which we were designing towards. We had a few brick selections and wanted to make sure everything we ooked at not only aligns as you can see to the bricks of Downtown Dover but also what the public had in mind for their new amenity. One thing we were also looking at and was a result of the Open Houses, is how do we create detailing on our garage that reflects what's there and not bringing in new elements. The most important pictures are on the top right of that slide. That is directly across the street from our development site. It was really the logical path for a lot of our detailing design work. Looking at this and through the guidelines of your Design Standards and Guidelines, there's a great emphasis on making sure that the building fits dimensionally to Downtown Dover. What we looked at were a lot of the historic cornice lines and making sure that while the structure is taller than a few of the buildings around us, we want to make sure it didn't feel like it. So, with that and the C-2 zoning requirements, it allows us to sort of step back the taller pieces of our building but remain intact at the sidewalk to create a comfortable very Dover pedestrian experience. You can see on the first two levels in both pictures, really the cladding of brick, which is really the kind of material of Downtown Dover. Dover you think brick. We agreed that we think it's a beautiful material to continue that legacy. With that, we are sort of creating this storefront in which you don't feel like you're going into the bit of history. It's something that's just a continuation of your story. And with that, there's elements of design which are let's say “storefronts” which create the same rhythm and scale of glass that you see on all the storefronts on Loockerman Street but also on Governors Avenue. The storefront that you see on the top image is the same scale of the building across the street from us on Governors Avenue. We are really making sure that we're not deviating too far from your Guidelines and making sure this does fit. These are both elevations: on the top is South Governors Avenue and on the bottom is South Bradford Street. These really are two storefronts or two fronts of our building and we wanted to make sure that they are really staying with it. We did a lot of detailing and effort in the detailing to make sure that what we provide has reference to history but also provides a new interpretation of that. The next two elevations we are looking are at the top of Minor Street Alley, which is our southernmost border of our parcel, and our northernmost border on the bottom. This is facing or butting the Harry Louie Laundry and Dry Cleaning. An important thing to look at on the first image is really how we wrapped the corner with brick. While we were doing analysis of this site, we realized that we had a front but also a corner that is very prominent from the street. We wanted to make sure that it had as much love and attention as our fronts. So, on the ground floor with this dual height space of a welcome center, we continue that brick around to really 5 7

Page 8

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 show care for our neighbors and we wanted to make sure it was very beautiful and comfortable for that experience. Then on the right side of this, we're sort of pointing towards the future with our code mandated stair tower. With that we've selected glass to reflect the history around it but also to be a beacon when you are traversing this on foot to really see once you're done shopping where the parking garage is. Then on the southern image, we're looking at ways to bring in the public. I know this was a comment on the Staff Report about incorporating public art. On this section we have a Code mandated firewall; and we believe that this is a great opportunity to hold a public RFP to create a mural and art which the public will get involved in another level to our design. This slide is our approach on Governors Avenue facing northeast. You can really see all of these design elements sort of fitting together with the code requirements for not only setback but making sure it feels within the site. So, really making sure that that pedestrian experience is comfortable. We didn't want to have a garage that felt unsafe with this making sure that it's an extension of Main Street but also providing opportunity for future development. One thing that we were making sure to involve was the Dover Kent County MPO (Metropolitan Planning Organization) Plan and recommendations for future development. And one of those were ride share locations. So within this, we've identified a future growth at this site to include the MPOs recommendations. One thing to also note is that we acknowledge that all this signage is up for further review. We have given a pretty good first pass of what we think will work depending on or in accordance to your standards and we recognize that that would be another process down the road. Looking at this slide, this is South Bradford Street. Through the Open House, there was a great concern of comfort for families living on Bradford Street and making sure that this is comfortable for families and isn't more of an imposing structure than it needs to be. So, with that we've extended our canopy outwards to make sure that this really feels comfortable from the first story up as well as making sure that the entrances for the garage themselves are clearly designated and available to see from a distance. If you have your family walking down, you don't have to worry about potential impacts. We recognize that this needs to be comfortable for everyone. We have a couple final perspectives, and we have one after this slide that will really show all these other things in addition to the Staff comment. The first perspective you see is north on South Bradford Street from Loockerman Street. With this, you can see the glass stair tower reflecting but also the brick elements that really bring down the height of this building. The idea with this is that the first two floors are the main mass of the structure, whereas, the upper two levels sort of fade into the distance and fade to make sure that at the historical cornice line, you're really feeling the weight of the two-story structure rather than the weight of the four- story structure. You can sort of see that in effect on the second image with the perceived setback. It feels once you move past Harry Louie Laundry & Dry Cleaning that this is a two-story structure with the precast panels up above sort of fading into the trees. That was our main architectural design element here. And then lastly, this is a new image which you'll see on your desk this evening. This is a new image that we've created as a result of Staff comment to show the experience from Loockerman Street to make sure that our structure doesn't feel imposing to the Loockerman Street experience. And, as we designed this, we sort of reaffirmed for ourselves that this structure really fits in. It's hard to see actually where the structure is and with the existing treescape the upper levels are really camouflaged to our benefit and the public’s in whole. JD noted that we found that the City Staff did a very thorough job in their review, and we acknowledge the comments for recommendations and conditional items that were included in the Staff Report. We remain committed to adhering to those and working with Staff to find ways to 6 8

Page 9

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 make those all possible. At this point, I wanted to pause and turn it back to the Commission and hear any questions or comments that may be at mind. Chairman Czerwinski said thank you very much for your presentation. Chair Czerwinski asked if there were any other questions. Mrs. Richardson mentioned that she was very pleased to see that you're going to have an entrance from both Governors Avenue and from Bradford Street. Will both of those entrances be available for the public? I know a section of the garage is going to be designated for the apartment residents. Mr. Michael Caine replied that the designation of parking is something that we would present as part of the future plan submissions. I think that's all part of the overall parking management plan. At this time, these remain open to the public on both Governors Avenue and Bradford Street. There has not been any thought otherwise up to this point. The second question that I have doesn't have anything to do with the aesthetics, but considering the EV mandate that our State has passed. How many charging stations will be available in this parking garage? JD replied I don't know that we have a certain quantity defined at this time. There's not necessarily a Code requirement that would require a certain number, but I think this is something again that would be presented as part of the Site Development Plan and would be addressed as part of that process. But certainly, it’s something that's been top of mind because we are aware of the mandate moving forward. Mrs. Richardson mentioned that she would think that you would need to have that in the plans before you begin. JD replied correct and what I would note is that in terms of weight, that's usually a concern. The structure itself is intended to be prepared for that. So that's typically, you know, the concern that comes up is the weight of those vehicles. There's certainly access to lower-level parking that would be ideal for that but in terms of quantity, that has not been defined at this point as part of the architectural design. Mrs. Richardson asked about the glass that's going to enclose the staircase. Is that going to be a mirror glass? Mr. Caine replied yes, we don’t intend for this to be mirror glass per say but just reflecting with a regular storefront glazing. We do anticipate some reflections: it’s just not going to be a mirror. One of the things that came up during our public conversations early on in our master planning efforts was public safety and making sure that when you are in the stair towers, you do feel comfortable and being seen and not providing any hiding areas in case something might happen. So, that was really sort of the nexus behind this. But with it, we also provide something beautiful. I think with the glass, but to answer your point, it's not going to be mirrored glass per say. It's just more of a standard store front glass. Mrs. Melson-Williams said why don't we move back to the elevation series so we can have a reference to that? Ms. Horsey asked as she referred to the Revised Plan on the screen, is the only difference the recession of what's not on that particular corner? The one in the packet was brighter. Is that the main revision that was done? Mr. Caine replied correct. The main revision is pertaining to the bottom image. We just wanted to clarify as the image that was sort of misleading or misrepresenting of what we are doing. The intention is to keep the same material all the way around so it wouldn’t look too dark. So, we just lightened it up for everyone to really bring home that's the same tool. 7 9

Page 10

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 Ms. Horsey mentioned that was what she assumed. She wanted to compliment him and know that Bernardon consistently puts out good design plans; so, I'm really pleased. Mrs. Mason mentioned that here the comments were all very positive. I think it's going to be a real boost to Dover. I like the way that you have combined new structures and a more modern feeling. It seems to blend into it so beautifully and I think it is a great design. Chairman Czerwinski mentioned on the higher elevations, the concrete portion of the parking garage looks white. He asked if it was going to be like a marble white or is that going be a gray? Because if it's a marble white, awesome. They can maintain a lighter concrete to give the impression of like the white offset to the brick. I hope that's the case because it looks really good that way. If it is gray, it’s not going to look so good. Mr. Caine replied if you remember at the public meeting, we had those two samples: it’s the lighter white. It wasn't a pure white but it's still like a very light gray. That's our intended material, not the darker the two which we had. Chairman Czerwinski mentioned I really appreciate the design elements on the upper elevation. It's wonderful. My only concern is I'd love to see it go around the building instead of just on the facades. The reason is because on the north elevation the building is quite exposed, very exposed. Also, if you look on Governors Avenue or the southern elevation on Governors Avenue, you’ve conveniently got a tree blocking it and it's not going to show. I'm asking if there's any way that the design element in the upper blocking of the concrete sections can be extended around the north and south elevations of the parking structure. I know it's probably going have some cost, but I think because this is a five-story structure, it's going to stand out. Especially if you're approaching it from the north, that's going to be quite blazingly open even with the mural which could be a very temporary thing. The murals are never a permanent part of an architectural design element. From the long term, I would love to see these elevations incorporate those elements that is quite visible. It's very visible, maybe not from Loockerman. I'm hoping that you can extend that design element all the way around the building. You did a wrap around on Governors as far as the brick elements, I'm hoping that you could do the same for Bradford. If you look at Bradford Street north elevation, you will notice that the brick element on Bradford stops right at the corner. You've done it for Governors on the south elevation. I'm hoping that you can do it for Bradford on the north elevation because that just stops right there. At the lower left, you will notice that the brick just stops at the end of the corner. I'm hoping that you could extend that around the corner just like Governors for consistency of the design. Mr. Caine replied yes. Chairman Czerwinski mentioned otherwise, I think it's a wonderful design. I appreciate the Staff and the contractor who did up the notes having a sensitivity for this. This is the dominating structure in the middle of town. I think you guys have done a wonderful job mitigating any major concerns with this. Especially if you got a white instead of gray because white will definitely suspend your disbelief on what you're looking at versus a gray structure which is very urban. You have to be very careful of that. Chairman Czerwinski asked if there were any additional comments? Ms. Horsey replied yes. She would like to reiterate what Chairman Czerwinski said about extending the brick. She mentioned if that was possible it would echo the other corner well and 8 10

Page 11

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 bring the overall design even more together. But Bradford Street you got to remember is a very pedestrian street and that would be nice to have more brick. Ms. Horsey mentioned that there were a lot of Staff Comments, and I know, you know what they are. She asked if they were going to follow them before they go before the Planning Commission level? JD replied he had a couple of points. There were a lot of comments; it was very thorough. I think there's some of them that that we'd like some more additional information from Staff. I think that's something that we would work through between now and the Planning Commission submission. I don't think as a group or as a team, we met about these items, reviewed each of them. We have a general understanding of what the Staff Recommendations are at this point. Chairman Czerwinski asked if there were any other comments? If not, thank you very much. I appreciate your time. We might have further questions in the future. Thank you very much. The public hearing is open. My name is Todd Stonesifer. I'm the Board Chair for the DDP (Downtown Dover Partnership). I reside at 115 N. State Street. There are a couple of letters that Mrs. Melson-Williams discussed in her introduction. I just want to make sure that you all have a copy of each of those and if they need to be read into the record, I may be able to do that. Mrs. Melson-Williams replied that she could take of it. Mr. Stonesifer replied thank you, that's all I have. Chairman Czerwinski asked if there was anyone else that would wish to speak. If not, then we will move to online. Mrs. Melson-Williams mentioned that online we have a couple of observers. We do have Mrs. Ann Marie Townshend of the Rossi Group. Her and her staff were the initial reviewers of the project and the start of the Report. I'm sure she'll share the kudos to those staff members as well. We also have a representative of the Dover/Kent County MPO. Ms. Marilyn Smith the Director for the Dover/Kent County MPO stated that they did not have a statement at this time. Those are the only virtual participants we have. As noted, we did receive some written correspondence and at this time Staff will enter that into the record. First is a letter received today from the Central Delaware of Chamber Commerce. It was provided on the desks of the Historic District Commission Members. It is signed by Dr. Dina Carol Vendetti, President and this is written on behalf of the Central Delaware Chamber of Commerce to express their support of the design for the new Downtown Mobility Center. Again, they note about it being an integral part of the Master Plan. It mentions the partnership of Central Delaware Chamber of Commerce with the Downtown Dover Partnership and as part of the ongoing work and envision for a revitalized Capital City. It's specifically related to the new structure, the letter notes that they work diligently to honor the historic nature of the district in which the structure will be constructed, while also working to comply with the City's designed Guidelines, and then it goes on to note the public input. They believe the proposed structure does a great job in honoring and fitting in the historic facade of Downtown while incorporating modern amenities and embellishments. They in short support the proposed Plan for the Downtown Mobility Center. 9 11

Page 12

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 The second letter that we have for the record was also provided to the Historic District Commission Members. It is received from the Biggs Museum of American Art addressing the Commission. It is signed by their current Executive Director, Hassan Najjar, and it again is a letter of support; and they note their strong support for the proposed Mobility Center and Parking Garage. He notes specifically as he is a new resident of Dover just coming on board as the Executive Director for the Biggs Museum that he has seen the challenges that a city can face when parking needs are addressed too late in the development process and parking as an afterthought. This one proposes to be proactive in planning for that parking to ensure accessibility and convenience as redevelopment progresses here in Downtown. He speaks to its strategic location and thoughtful design to enhance traffic flow, support businesses, and provide vital access to cultural institutions here in Dover including the Biggs Museum. Again, noting that they commend the Downtown Dover Partnership for prioritizing the project noting their support. The public hearing was closed seeing no one wishing to speak in the room or virtually. Chairman Czerwinski asked if there was anyone else with questions or concerns. There was none. Mrs. Mason moved for approval of the Architectural Review Certification Application HI-24-09 Dover Mobility Center Garage at 133 South Governors Avenue as presented including the elements of Staff review comments and recommendation found in Section VI of the Report. It was seconded by Ms. Horsey and approved 4-0. NEW BUSINESS Review of Permits Referred to Commission Mrs. Melson-Williams mentioned that there were no permits to specifically bring to the Commission today. Annual Meeting of Historic District Commission Mrs. Melson-Williams mentioned that normally your Annual Meetings are in November, but since we had no applications, we thought we could just wait until December. Also, I was hoping there will be a fifth member, but we're still working on that evidently. Election of Chair and Vice-Chair Ms. Horsey made the nomination that Mr. Czerwinski remain Chair and Mrs. Richardson remain Vice-Chair for the next calendar year. Mrs. Mason seconded the nomination for Mr. Czerwinski to remain Chair and Mrs. Richardson to remain Vice-Chair of the Historic District Commission. All members present were in favor of the motion to accept Mr. Czerwinski as the Chair and Mrs. Richardson as the Vice-Chair of the Historic District Commission. Vote of 4-0 by consensus of those present. 10 12

Page 13

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 Meeting and Deadline Schedule for 2025 DRAFT Mrs. Melson-Williams mentioned that Staff has prepared a draft of the schedule. Your meetings remain on the third Thursday of the month, with a deadline that's established in the month prior. Those tend to fall on either the second or third Friday of the month depending on how the calculations work out. An application has to be filed a minimum of 30 days prior to your meeting. So, this sets out the meetings for all of 2025. I can tell you that we did not receive any specific applications since the filing deadline was last week. However, we will make a determination in early January if there are any other items that need to be brought to you for a January meeting. If there are none, we will cancel that meeting. Per your By-Laws at a minimum, the Historic District Commission must meet quarterly. We will double check all these dates and finalize that officially and be ready to use it come the new year. Chairman Czerwinski asked if here were any questions. Chairman Czerwinski asked if he could discuss anything else during this period as far as a potential fifth member? Mrs. Melson-Williams replied that the membership for the Board is actually offered first by the Mayor to City Council. So certainly, if you have ideas or potential candidates, there is an application that is available on the City's website. Staff would be more than happy to pass along any suggestions you may have to the Mayor or you could contact the Mayor's Office directly on that. With the Historic District Commission, the Zoning Ordinance does prescribe a hopeful membership group in that it would have representatives ranging from the professional side to residents of the District to business owners in the District and Archaeologists (I don't think we've ever had) and Architects. Those are a variety of expertise with all individuals being a resident of the City of Dover and having an interest in history and historic preservation. Chairman Czerwinski mentioned that we do not have to discuss names, it's just relaying to my fellow members the importance of keeping their eyes open for potential members. I must do the same myself. We only have four members, and you know we have to look for another person to become a member. We have to keep our eyes open. I don’t have anyone in mind at the moment. Mrs. Robinson mentioned that she would like to see someone from business or someone from the professional side, you know, because we have our personal opinions. Losing Jonathan as a member, it hurt the Commission, in her opinion. Chairman Czerwinski stated that there's going to be a point that we are not going to have enough members on the Board unless we plan ahead and start really aggressively looking for other members. You know what I mean? Mrs. Mason stated that she kept trying to go up and down Loockerman Street and throughout the town, asking people she knew if they wanted or were interested in becoming a member of the Historic District Commission. I’m sorry to say that I could not get anyone. I thought that would help but it’s really hard to get someone. Chairman Czerwinski stated that I just want to take that moment out because I’ve got to remind myself. I have to do the same thing. Someone is probably right in front of me that I don’t know 11 13

Page 14

Item 1. CITY OF DOVER HISTORIC DISTRICT COMMISSION DECEMBER 19, 2024 and I'm not paying attention to that would be a good member. So, just keep working at it because we definitely need to get that fifth member. OLD BUSINESS Certified Local Government (CLG) Program Mrs. Melson-Williams mentioned that she had nothing new to report. Implementation of 2019 Comprehensive Plan Mrs. Melson-Williams mentioned that for the Implementation of the 2019 Comprehensive Plan there's always something going on that we could point to that strives to meet some of the goals and visions of the Comprehensive Plan. Certainly, I think what we've seen this year with the Downtown redevelopment efforts from a variety of standpoints can point to that. Perhaps in the new year, we'll take a closer look to the Historic Preservation Chapter of the Comprehensive Plan to see if there's any kind of targeted efforts, we want to look at there. There was an opportunity for a grant with the CLG program but currently we're trying to keep our heads about water in the Planning Office. So, I'm not sure that we've got the bandwidth to tackle something else at this point. Chairman Czerwinski asked if there were any questions or comments before we adjourn? Chairman Czerwinski wished everyone a happy and safe holiday this season. See you next year. Mrs. Mason moved to adjourn the meeting seeing no other items of business, seconded by Ms. Horsey, and unanimously carried 4-0 of the members present. Meeting adjourned at 4:37 PM Sincerely, Maretta Savage-Purnell Secretary 12 14

Page 15

City of Dover Historic District Commission Summary of Applications 2024 Item 2. Updated thru February 10, 2025 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-24-01 Referral of Fence 146 S. State Street Fence Permit Permit #23-1868 referred to HDC by Permit Application received 12/13/2023 Permit #23-1868 City Planner for consultation on and Referred to the HDC for consultation. at 146 S. State Architectural Review Certification; The Fence is subject to Code Enforcement Street 1/28/2024 HDC deferred action on Case #23-3983 for installation without a ArchRevCert seeking additional Permit. It is a vinyl fence that is six foot in information on its materials, location, height. HDC granted ArchRevCert subject to and another nearby fence. 2/15/2024 conditions: Fence #2 must be wood and 4 HDC granted ArchRevCert subject to feet in height. Fence #1 due to location can conditions. remain at vinyl at 6 feet. Permit issued in April 2024. Part of Fence removed. HI-24-02 Building 148 S. Bradford Review for Public Hearing and Review for Request to demolish existing building Demolition at 148 Street Architectural Architectural Review Certification by (currently used as offices). HDC denied S. Bradford Street Certification for HDC on 5/16/2024. Action to deny ArchRevCert for demolition. Applicant filed Demolition ArchRevCert. an Appeal to the Planning Commission; Appeal considered by Planning Commission on 6/17/2024. Planning Commission granted approval of ArchRevCert to allow Demolition of Building. Demolition Permit #24-1835 issued; demolition almost complete. HI-24-03 Building 150 S. Bradford Review for Public Hearing and Review for Request to demolish existing building Demolition at 150 Street Architectural Architectural Review Certification by (currently used as offices). HDC denied S. Bradford Street Certification for HCD on 5/16/2024. Action to deny ArchRevCert for demolition. Applicant filed Demolition ArchRevCert. an Appeal to the Planning Commission, Appeal considered by Planning Commission on 6/17/2024.Planning Commission granted approval of ArchRevCert to allow Demolition of Building. 15

Page 16

City of Dover Historic District Commission Summary of Applications 2024 Item 2. Updated thru February 10, 2025 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-24-04 Legislative Hall 425 East Avenue, Site Plan Review for Public Hearing and Review for Site Development Plan review for new Parking Garage at corner of East Architectural Review Recommendation on Architectural Parking Garage Structure and associated 425 East Avenue Avenue/ E. Water Certification Review Certification by HDC on site improvements. Recommendation on Street and Martin 5/16/2024. Recommended approval of ArchRevCert will be forwarded to Planning Luther King Jr. ArchRevCert for project. Commission for future consideration during Boulevard South Site Plan review process. Application filed with Board of Adjustment for variances related to floodplain requirements; BOA considered on 6/20/2024 and granted approval of two variances (V-24-01). Site Plan Application (S-24-14) filed and granted conditional approval and ArchRevCert by Planning Commission on 9/16/2024. Applicant working to finalize Site Plan documents. HI-24-05 Building 120 S. Governors Review for Public Hearing and Review for Request to demolish existing commercial Demolition at 120 Avenue Architectural Architectural Review Certification by building (was Acme grocery store then S. Governors Certification for HDC on 6/20/2024. Granted approval recent tenants of auto parts store and a Avenue Demolition of ArchRevCert to allow Demolition of Child Day Care Center). Demolition Permit building. issued and demolition activities underway in Fall 2024. Demolition of building completed. HI-24-06 Delaware 55 The Green Site Plan Review for Public Hearing and Review for Action Review of ArchRevCert for one story Supreme Court Architectural Review on Architectural Review Certification Building Addition. Project is subject to an Building Addition Certification by HDC on 9/19/2024. Granted Administrative Site Plan process; and Renovations approval of ArchRevCert to allow Administrative Site Plan filed and currently building addition. under review. 16

Page 17

City of Dover Historic District Commission Summary of Applications 2024 Item 2. Updated thru February 10, 2025 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-24-07 Legislative Hall 411 Legislative Site Plan Review for Public Hearing and Review for Site Development Plan review for Building Building Addition Avenue Architectural Review Recommendation on Architectural Addition and Plaza Area and associated site Certification Review Certification by HDC on improvements. Recommendation on 10/17/2024. Recommended approval ArchRevCert will be forwarded to Planning of ArchRevCert for project. Commission for future consideration during Site Plan review process. Site Plan Application filed and granted conditional approval with ArchRevCert by Planning Commission on November 18, 2024. HI-24-08 Referral of 21 N American Building Permit Permit #24-1399 referred to HDC by Permit Application received 9/25/2024 and Building Permit Avenue (and City Planner for consultation on Referred to the HDC for consultation. #24-1399 at 21 N. previously 19 N Architectural Review Certification; Project for demolition of rear addition, American Avenue American Avenue) Scheduled for HDC Review on rebuild of rear addition, renovation to first 10/17/2024. Recommended Approval rear addition, remove asbestos siding and of ArchRevCert subject to conditions. reclad with vinyl siding, and porch renovations. HDC per conditions of ArchRevCert allowed demolition of rear addition and reconstruction, recladding with vinyl siding, and minor change to rear window placements. Permit issued subject to conditions. HI-24-09 Dover Mobility 133 S Governors Site Plan Review for Public Hearing and Review for Site Development Plan review for Dover Center (Parking) Avenue, 139 S Architectural Review Recommendation on Architectural Mobility Center (multi-purpose Parking Garage Governors Avenue, Certification Review Certification by HDC on Garage) and associated site improvements. 145 S Governors 12/19/2024 and recommended Recommendation on ArchRevCert will be Avenue, 136 S ArchRevCert subject to conditions. forwarded to Planning Commission for Bradford St, 148 S. future consideration during Site Plan review Bradford St, 150 S process. Site Plan Application (S-25-01) Bradford St filed and Planning Commission granted conditional approval in January 2025. 17

Page 18

City of Dover Historic District Commission Summary of Applications 2023 Item 2. Updated thru February 10, 2025 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-25-01 The Old Post at 55 Loockerman Plaza Site Plan for Review for Architectural Review Site Plan to be reviewed by Historic District 55 Loockerman (Old Dover Post developmet of mixed- Certification of Site Plan; Public Commission Plaza Office) use with apartments Hearing and Review by HDC scheduled for 2/20/2025. 18

Page 19

2024 Permit Activity in the Historic District Item 3. Updated thru 12-31-2024 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 1/26/2024 24-67 28 W Loockerman St, The Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations - storage area Hive Renovations required for interior work. wall. 2/21/2024 23-887 29 N State St, Office Sign Permit Staff Approval. No ArchRevCert Installation of monument sign in required for interior work. State building sign format. 2/5/2024 24-84 3 S American Avenue, Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations of office space. Offices Renovations required for interior work. 2/23/2024 24-159 89 Kings Hwy SW, Roof Permit No Planning Staff Review. Roof replacement project. Richardson & Robbins Building 2/26/2024 24-198 401 Federal Street, Building Permit - Exterior Staff Approval Repair and reconstruction of ADA Townsend Building Improvements ramp system on north side of building and parking lot areas improvements. 3/4/2024 21-1660 215 W Loockerman Street, Building Permit - Exterior Staff Approval Renovations to entry door and Mountain Consulting Renovations creation of vestibule entry area with storefront door/window system. 3/19/2024 23-1383 8 The Green Building Permit - Exterior Staff Approval Replacement of wooden egress stair Renovations to side/rear of building. 3/25/2024 23-1868 146 S State Street, Offices Fence Permit HDC Consultation on ArchRevCert Fences built without a permit; Code 1/18/2024 and 2/15/2024; Staff Enforcement Case. Referral of Fence approval per ARC Permit as HI-24-01. HDC approved with conditions: Fence #1 to remain a 6-foot vinyl as limited visibility; Fence #2 to be replaced by 4-foot wood fence. 3/25/2024 23-1874 1 Kings Hwy NE Roof Permit No Planning Staff Review. Replacement of roof on back of house. 3/25/2024 24-147 108 W Loockerman St Roof Permit No Planning Staff Review. Roof replacement project. 4/23/2024 24-455 217 W Loockerman St Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for fire walls Renovations required for interior work. and rear door to storage area. 4/29/2024 24-566 147 S Governors Avenue, Sign Permit Staff Approval Installation of hanging sign for Pastries Deli & More business tenant. 19

Page 20

2024 Permit Activity in the Historic District Item 3. Updated thru 12-31-2024 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 5/8/2024 24-546 151-181 Kings Hwy SW, Administrative Permit Staff Approval. Brick repair and repointing of patio Woodburn areas. 5/23/2024 24-697 501 S State Street, Christ Temporary Sign Permit Staff Approval. Temporary Banner installed June- Church July. 6/26/2024 24-570 231 W Loockerman Street Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for two Renovations required for interior work. apartment units. 6/25/2024 24-709 43 The Green, John Bell Fence Permit Staff Approval. Installation of wood picket fence to House comply with maximum 4-foot height. Original materials revised to comply with DS&G. 6/27/2024 24-897 136 W Loockerman Street, Sign Permit Staff Approval Installation of window sign and Key to Life Juice Bar hanging blade sign for new business tenant 6/28/2024 24-921 29 S State Street, Ward & Sign Permit Staff Approval Installation of wall sign and post Taylor Law Office sign for new office tenant 7/22/2024 24-123 26 S State Street, Building Permit - Renovations Staff Approval Replace rear egress stairs in area at Apartment Building rear of building - not visible from street right-of-way 8/13/2024 23-1492 32 W Loockerman St, Fears Sign Permit Staff Approval per previous Sign Installation of two window signs Barber & Beauty Shop Permit Referral to HDC at HI-23-04 (vinyl applied to window) for Barber and Beauty Shops; other Fears Promotions Signage not included in this permit. 8/1/2024 24-757 223 S State Street Roof Permit Staff Approval Existing flat roof on upper third floor roof to be replaced with EPDM roofing. Location is not visible. 8/6/2024 24-894 89 Kings Hwy SW, Fence Permit Staff Approval Replacement of existing 8 ft. Fence Richardson & Robbins to include privacy slats in rear Building (DNREC) location that is not visible from right- of-way. 20

Page 21

2024 Permit Activity in the Historic District Item 3. Updated thru 12-31-2024 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 8/13/2024 24-1150 32 W Loockerman St, Fears Sign Permit Staff Approval. Signs related to installation of window and wall Promotions previous Sign Permit Referral to HDC signs for Fears Promotions (Boxing). in HI-23-04. Wall signs revised to vertical format rather than horizontal. 9/3/2024 24-908 523 S State Street, Christ Temporary Sign Permit Staff Approval Installation of Banner for period of Episcopal Church 60 days. 9/9/2024 24-1123 21 N State Street, State Sign Permit Staff Approval Installation of replacement signs at Street Assisted Living parking lot entrances, hanging signs on front porch, and monument sign for facility. 9/3/2024 24-1237 120 S Governors Avenue Demolition Permit Staff Approval per HDC issued Demolition of "Old Acme Building" ArchRevCert for HI-24-05 to allow and stabilization of site. Demolition. Redevelopment will be subject to future Site Plan/ArchRevCert review process. Demolition complete. 10/25/2024 22-1164 537 S State Street Roof Permit No Planning Staff Review. Roof Permit to replace existing shingle roof. 11/6/2024 24-1573 136 E Water Street, DSEA Window Permit No Planning Staff Review. Replacement of windows. Office Building 12/23/2024 24-1594 29 W Loockerman Street, Sign Permit Staff Approval Installation of new projecting sign Sha Scrubs (Retail Store) on existing metal scrollwork for new retail tenant. 12/17/2024 24-1672 3 S American Avenue, Fence Permit Staff Approval Instatllation of black metalpicket Edward Jones Office style fencing as gate to side of building and fence along rear property line. 12/2/2024 24-1750 9 E Loockerman Street Roof Permit No Planning Staff Review Roof work but likely not visible as building has a flat roof system. 21

Page 22

2024 Permit Activity in the Historic District Item 3. Updated thru 12-31-2024 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 12/23/202424-1839 419 S State Street Roof Permit Staff Approval. Removal of rear non-operating chimeny to below roof line and repair of another non-operating chimney. Both are not visible from public view. 22

Page 23

Summary of Permit Applications with Architectural Review Certification Item 3. 2024- Updated Thru 2-10-2025 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 1/17/2025 24-1399 21 N American Avenue Building Permit - Interior & Staff Approval as per HDC Action on Demolition of rear addition and its Exterior Renovations ArchRevCert HI-24-08. rebuild, exterior finish renovations to allow vinyl siding, renovations to front porch. Permit was referred to the Historic District Commission for review. 1/13/2025 24-1835 148 S Bradford Street Demolition Permit Staff Approval as per PC Final Action Demolition of existing one-and-half regarding ArchRevCert (appeal of story building for future HDC denial of ArchRev Cert) HI-24- redevelopment of site. HDC denied 02. request on 5/16/2024 and Appeal to Planning Commission granted approval 6/17/2024. Demolition is almost complete 23

Page 24

Item 4. City of Dover ARCHITECTURAL REVIEW STAFF REPORT Before Dover Historic District Commission February 20, 2025 Application: The Old Post at 55 Loockerman Plaza, HI-25-01 Owner: City of Dover Equitable Owner: Old Post, LLC Location: Northwest corner of Loockerman Plaza and Innovation Way in Dover, DE Addresses: 55 Loockerman Plaza Tax Parcels: ED-05-077.05-04-53.00-000 Size: 1.267 acres +/- Present Uses: Vacant Building – Former Dover Post Office Proposed Use: Mixed-Use Commercial and Multi-family Housing (Apartments) and associated parking Present Zoning: C-2 (Central Commercial Zone) H (Historic District Zone) SWPOZ (Source Water Protection Overlay Zone) For Consideration: Architectural Review Certification Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The Report was completed with additional review and editing by the City’s Planning Office. I. PROJECT DESCRIPTION: The Historic District Commission will act to make a recommendation for an Architectural Review Certificate for a Site Development Plan Application for the proposed building renovation and expansion for a mixed-use commercial and multi-family (apartment) development in Downtown Dover, to be located at 55 Loockerman Plaza, also known as The Old Post. The development proposal for the 1.267-acre site includes the demolition of the rear warehouse portion of the existing building, the preservation of a 4,560-SF portion of the existing building, and a proposed building addition of 31,500 SF for 36 residential apartments. The property is zoned C-2 (Central Commercial Zone) and is subject to H (Historic District Zone). The south portion of the site along the frontage P. O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 24

Page 25

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 2 of 9 of Loockerman Plaza is within the SWPOZ (Source Water Protection Overlay Zone) Tier 3 Excellent Recharge Area. Because the property is within the Downtown Redevelopment Target Area, it is exempt from the requirements of the SWPOZ. The owner of record is the City of Dover, and the equitable owner is Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05- 077.05-04-53.00-000 Surrounding Land Uses The location of the subject property at the corner of Loockerman Plaza and Innovation Way is within the Downtown Development District (and Downtown Redevelopment Target Area). As previously noted, the parcel is zoned C-2 (Central Commercial Zone) and within the Historic District. Properties immediately adjacent to the subject project location are zoned IO (Institutional and Office Zone). The Dover Public Library is adjacent to the site to the west. Properties owned and occupied by the State of Delaware are adjacent to the north (Department of Natural Resources and Environmental Control) and across Loockerman Plaza to the south. The property across Innovation Way to the east is Treadway Towers, which includes offices and a restaurant. The surrounding properties are also within the H (Historic Zone) and the SWPOZ (Source Water Protection Overlay Zone) Tier 3 Excellent Recharge Area. Previous Applications The existing structure was constructed in the 1960s and was in service as the Dover Post Office until the new post office location opened on Bank Lane in 2021. The property owner is the City of Dover. After the Post Office closed, the City initiated an RFP process to solicit proposals for redevelopment of the site. The equitable owner, Old Post, LLC was selected through this process. Application Z-24-01, approved by City Council on February 12, 2024, rezoned the property from IO (Institutional and Office Zone) to C-2 (Central Commercial Zone) with it remaining in the H (Historic District Zone) and SWPOZ (Source Water Protection Overlay Zone). II. HISTORIC PROPERTY INFORMATION Review of Historic Maps Prior to 1926, Loockerman Plaza did not extend beyond South State Street. Loockerman Plaza was extended between 1926 and 1936. The building was constructed in the 1960’s. Property Information The subject property is located within H (Historic District Zone) as established by the City of Dover. There are four contexts that contribute to the historic character of Dover, including the Green Historic Context; the Victorian Historic Context; the Loockerman Historic Context; and the Capitol Square Historic Context. This property is located within the Capitol Square Historic Context. The first buildings in the Capitol Square Context were built in the 1930’s and 1940’s as part of the Federal Works Project Administration. The Design Standards and Guidelines for the City of Dover Historic District Zone describe this context as “neo-Georgian featuring two-story brick facades with a water table, marble surround at the entrance, keystones over the window heads, dentilled cornices and hip roofs… greater latitude is recommended in determining what is appropriate for new construction and additions within this context… a compatible contemporary building is preferable to a falsely historical one.” 25

Page 26

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 3 of 9 The building located at 55 Loockerman Plaza was constructed in the 1960s. The most prominent features are the 5-bay Classical pediment with its turned gable, tympanum, and large columns. Under this projection, the front elevation wall is setback and includes the door entry with pedimented surround. The building has a gable roof with the rear being a flat roof system. It features a brick exterior, columns, dentil cornices, and shuttered windows. The building currently includes second floor offices (approximately 2,160 SF), a basement (approximately 5,865 SF), and the first floor of approximately 21,151 SF. There is an existing on-site parking lot (unmarked) and loading dock. The interior has been completely gutted as a result of recent asbestos abatement. The structure is not listed on the National Register of Historic Places, and this portion of the Historic District is not part of an Historic District listed on the National Register of Historic Places. III. PROJECT PROPOSAL PROJECT PROPOSAL (Submission of January 2025): The application proposes the demolition of the rear portion of the existing structure and replacement of that structure with a new addition, while maintaining and rehabilitating the front of the present structure (4,560 SF). Capital City 2030: Transforming Downtown Dover Master Plan identified the Old Dover Post Office as a Project Site. The Master Plan proposes that a new commercial building could reactivate the site. This project is also identified as a Key Project within the City’s Downtown Development District (Renewal) application of 2024. The proposed development will repurpose two 2,500-SF retail units and one 2,000-SF for a business (office) space in the former Post Office front area. The rear warehouse portion of the building will be demolished and replaced with a new three-story structure comprised of 36 apartment (multifamily) units. The Applicant’s submission includes a Narrative Letter, a Site Plan set, and Architectural Graphics set with building elevations and 3-D views. The elements of the project are as follows: 1. Partial Demolition: The rear flat-roofed warehouse portion of the building is to be demolished as this is where the three-story building addition is proposed. The front gable roofed portion of the existing building is to remain. 2. Existing Building Renovations: New wood trim is proposed to match the existing. It is unclear from the submission if the design includes dentil cornices. New replacement shutters, windows, front door are noted to match the existing. The building elevations feature headers or some framing above each of the smaller windows. Each wing of the front portion of the building will include new larger openings with a proposed large glass Nanawall door system. 3. Building Addition: The proposed three-story addition will be located directly behind the preserved portion of building. The proposed addition will be 35 feet tall. The existing building is 33’ 2” tall at the peak of its roof. The addition will feature a brick veneer and brick engaged pilasters along all sides on floors two and three and floor one using EFIS in a 26

Page 27

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 4 of 9 limestone finish. The east and west elevations include large glass windows (with door) for the apartment unit spaces. Glass and black aluminum railings will be used to enclose balconies. 4. Parking Lot: A parking lot will be developed along the west side and north side of the building with access from Innovation Way. This new parking lot will not have vehicular access from the large municipal parking lot at the Dover Public Library. The applicant is also working with the City in regards to the adjacent row of parking to the east of the Library. The parking lot is fenced and appears to have grass lawn areas at the perimeter. 5. Sidewalks and Site Amenities: The proposal maintains connected sidewalks along Innovation Way and Loockerman Plaza. Therea re also sidewalks adjacent to the parking lot leading to the building. The renderings show additional amenities, including bicycle racks and benches. A fenced in dog-run is proposed to abut the building addition along Innovation Way. 6. Tree Planting and Landscaping: The project plan identifies five existing trees on the current site, it is not clear whether they will be removed to create space for new concrete patio areas or be kept. Please identify the trees on the site plan (Sheet PL-03) or where five replacement trees will be located. See the attached Plan submission and associated graphics and drawings for detailed information on building dimensions, locations, and material choices. IV. ZONING REVIEW The entire project site is located in the H (Historic District Zone) and subject to the provisions of the Zoning Ordinance, Article 3 §21 and referenced sections. Zoning Ordinance, Article 10 §3.2 outlines the review process for Architectural Review Certification and related building height, bulk, and setback standards. The property is partially within the SWPOZ (Source Water Protection Overlay Zone) Tier 3 Excellent Recharge Area, but it is exempt from the requirements of this zone due to its location within the Downtown Redevelopment Target Area. The subject project area is zoned C-2 (Central Commercial Zone). The C-2 zone allows for “retail stores, apartments and multi-family dwellings provided that now dwelling units shall be permitted on the first floor on the street frontage of Loockerman Street; uses accessory to the residential units such as lobby and amenity spaces are permitted on the first floor; live-work units; parking lots and parking structures” as principal uses. The subject property has frontage on two streets, Loockerman Plaza and Innovation Way. The C-2 zone requires a zero minimum front yard. No side yard is required; however, if one is provided then it shall be a 5-foot side yard minimum. A 20-foot rear yard setback is required above ground floor and 5-foot is required at ground floor. The maximum building height for this district is 10 stories or 125 feet. 27

Page 28

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 5 of 9 Code Compliance for C-2 Required Provided Front Setback 0’ > 35’ Rear Setback 20’ above ground floor. At > 100’ ground floor, 5’required Side Setback None required, but 5’ min. if Approx. 15’ provided Building Height 10 stories (125’) 3 stories (35’) The C-2 zoning district also includes some design standards provisions. See the code excerpt below: Article 3 Section 13 13.5 Design standards. The following standards shall apply to the site and building development in the central commercial zone (C-2): 13.51 Façade articulation. Building facades should incorporate design elements to provide a base, middle, and top of the building to reinforce the pedestrian scale at the street level. 13.52 Height. For buildings greater than four stories in height, then the upper floors above the fourth story shall step back six feet for fifty percent of the width of the primary facade. For buildings greater than six stories, then the upper floors above the sixth fl oor shall step back an additional six feet on the primary façade. These step back areas may begin at a lower height than these minimums as part of the building design in order to be compatible with the character of the area. 13.53 Step back areas. The step back areas should be open to the sky and can be open air balcony spaces or other design architectural features that are not enclosed spaces. 13.54 Off-street parking. Off-street parking lots shall not be permitted to be situated between the street line and the primary facade of the principal building. Consideration should be given to locating parking to the side or rear of the building. 13.55 Screening. Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. Off-street parking lots shall be screened from adjacent residential zones and residential uses. This screening provision does not apply to adjacent alleys. V. Review of DESIGN STANDARDS AND GUIDELINES The subject property is located in the H (Historic District Zone) within the Capitol Square Context. The Capitol Square Context is described on pages 2-8 and 2-9 of the Design Standards and Guidelines for the City of Dover Historic District Zone. This Design Standards and Guidelines describe this context as “neo-Georgian featuring two-story brick facades with a water table, marble surround at the entrance, keystones over the window heads, dentilled cornices and hip roofs… greater latitude is recommended in determining what is appropriate for new construction and additions within this context… a compatible contemporary building is preferable to a falsely historical one.” Location within the Dover Historic District Zone requires proposals for demolition, new construction, building additions, and certain renovation or rehabilitation activities to existing buildings to receive an Architectural Review Certificate. As stated in the Design Standards and Guidelines for the City of Dover Historic District Zone, an Architectural Review Certificate will be granted “if it is found that the architectural style, general design, height, bulk and setbacks, arrangement location and materials affecting the exterior 28

Page 29

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 6 of 9 appearance are generally in harmony with neighboring structures and complementary to the traditional architectural standards of the historic district.” In accordance with Article 10 §3.2, the Historic District Commission will provide a recommendation to the Planning Commission regarding the project’s compliance with the architectural review standards. This proposal must be reviewed for conformity with the design criteria guidelines found in Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings and Chapter 4: New Construction, Additions, Demolition and Relocation. Information on the review considerations is given below. Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings The Design Standards and Guidelines for Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings (Chapter 3: pages 3-1 through 3-27) provide the design criteria and development guidelines. The preservation of the historic character of the District is largely a function of the preservation of the existing historic building fabric. This Chapter discusses the various building elements and should also be referenced with new construction. Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. The guidelines specify that “parking lots should be screened from the street, their layout should include borders and islands planted with trees and shrubs to break-up expanses of paved areas. Given a parking lot within the Dover Historic District zone, at least 20% of the area within it should be unpaved and planted.” Demolition The proposal for demolition of a portion of the building must be reviewed for conformity with the design criteria guidelines found in Chapter 4: New Construction, Additions, Demolition and Relocation. The Design Standards and Guidelines gives guidance to the Historic District Commission by listing specific criteria to be evaluated when considering applications for the demolition of buildings (or portions of buildings) in the historic district (Chapter 4: pages 4-10 to 4-12). These guidelines are summarized below (see Design Standards and Guidelines for the complete text). 1. Determine the financial implications of maintaining a property versus demolition. 2. Regardless of economic issues the relative significance of the individual buildings slated for demolition should be evaluated. 3. In development related applications the City should review the schematic plans for the new structures to weigh the virtues of the new structure versus what exists. 4. Determine the extent of adequate recordation of a property the applicant would be required to complete if demolition were approved. 5. Lots left vacant by demolition should be treated in a manner that is sympathetic to the historic context. 29

Page 30

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 7 of 9 New Construction The Design Standards and Guidelines for New Construction (Chapter 4: pages 4-1 through 4-8) provide the design criteria and development guidelines. The guidelines specify the following individual considerations for new construction to be considered in the review by the Historic District Commission (and Planning Commission) of the project for Architectural Review Certification: • Style • Scale (building to reflect dominant cornice and roof height of adjacent buildings) • Elevation of the First Floor • Floor-to-Floor heights • Bays, windows, and doors (size, relationship, spacing of) • Absolute Size (compare overall size of new building) • Massing (relationship of solid-to-void) • Orientation (location of primary façade) • Proportions (comparison of height to width of building and elements) • Materials • Forms (shape of building and roof to be complementary) • Siting (location of building on lot and in relation to street) • High density/ large-scale construction The proposed project must also be reviewed for compliance with the standards established by the Zoning Ordinance. The standards include items such as setbacks from property lines, lot coverage, height, etc. This Proposal for the Old Post appears to conform to most of the bulk requirements of the C-2 Zoning District, however, should be verified via site plan review. The City of Dover Zoning Ordinance authorizes the Historic District Commission to waive certain bulk standards when issuing its recommendation to the Planning Commission for an Architectural Review Certificate if necessary. STAFF COMMENTS AND RECOMMENDATIONS The following are Staff comments and recommendations for this application regarding project activities and Architectural Review Certification. 1) Staff recommends conditional approval of the Architectural Review Certificate for The Old Post project, finding that the building to be of a compatible design with the nearby buildings and with the intent of the Design Standards and Guidelines for the City of Dover Historic District Zone. This includes the demolition of the rear portion of the building, the renovation of the front section, and the new building addition. The proposed multi-use site enhances the pedestrian scale of the downtown area. The preservation of the building portion fronting Loockerman Plaza maintains the historic context of the area. The brick exterior finishes on the upper two stories and EFIS in a limestone finish (to resemble stone) along the first story on the new addition take cues from the architectural styles seen in the Loockerman Street corridor and Capitol Square context. 30

Page 31

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 8 of 9 2) The following conditions are recommended by Staff to improve the project’s compliance with the recommended guidelines of the Design Standards and Guidelines. The following are recommended conditions: a. The selected brick choices should be compatible with the brick on the existing structure. The brick material color, size, and format should be identified. b. Clarify the wall section at the cornice shown as a soldier course to clarify if the cornice protects in a different plane than the general wall surface. Cornicework is a very significant feature of the buildings in the area. It is unclear if the proposed building would include dentil cornices. Dentil cornices are recommended, particularly on the south-facing side of the building. c. Consider additional detailing on the north elevation walls of the new building addition and the transition brick wall of the front building section. In the elevations provided these walls appear flat as large blank areas. While they are not visible from the adjacent streets, they are visible from the parking lot areas. d. A paneled door should be used on the door along Innovation Way. Modern flush doors are not appropriate. e. Repairing windows with in-kind materials is preferable to replacing windows. When irreparable, replacement windows should replicate the historic windows as closely as possible in light pattern, opening size, and function. f. While shutters are encouraged, vinyl and aluminum shutters are inappropriate. The material for the replacement shutters was not identified. g. It is inappropriate to remove historic decorative elements such as roof cresting or finials. h. Consideration of wall or free-standing signage may require additional review. i. Any light fixtures utilized on the property should be consistent with the style of the lighting used in the nearby areas of the Capitol Square Context of the Historic District. j. Any revisions or changes in the identified materials may be subject to further review by the Historic District Commission. 3) Some of the site improvements/amenities were not specifically described or had limited information within the application information. Please provide information for consideration and discussion. a. Any off-street parking lots provided shall be screened from the street line by buildings, landscaping, or other means. A four-foot black aluminum fencing appears to be proposed. b. Provide information on the dumpster enclosure construction and screening. 4) Clarify whether existing trees on the site will be preserved. If they are proposed to be removed, replacement of removed trees will be required. The development area (the property) is also subject to tree planting requirements of the Zoning Ordinance. A Landscape Plan sheet is listed in the Index on the Site Plan set as PL-04 but was not included in the submission. 31

Page 32

Item 4. HI-25-02 The Old Post Architectural Review Staff Report for Historic District Commission February 20, 2025 Meeting Page 9 of 9 5) Staff notes that the required setbacks and proposed building height listed in the data column are incorrect on the Site Plan set. Also use the project name of The Old Post consistently. See Dover Code, Appendix B, Article 4; Sec 4.14 for Bulk standards for the C-2 zoning district. 6) Staff recommends the following pertaining to the site design elements of the project: a. The sidewalk system on the street frontage should continue and include barrier free access, crosswalk striping, etc. at the points of intersection with the entrance and exit drive aisles. b. Any proposed landscaping or tree planting locations, and lighting fixture locations should be depicted on the plan and be consistent with the character of these elements as they exist within the Capitol Square Context area. 7) For building construction, the requirements of the building code or fire code must be complied with. Consult with the Building Inspection Staff and Fire Marshal regarding these requirements. The resolution of these items can impact the site design in some cases. 8) In the event that major changes and revisions to the design, materials, or site layout occur in the finalization of the plan and/or construction drawings contact the Department of Planning and Inspections. These changes may require resubmittal for review by the Historic District Commission. 9) This site development plan for this project is also subject to the application and review process for Site Development Plan (Article 10 §2 of the Zoning Ordinance) before the Planning Commission. Note: Additional technical items for compliance with the Zoning Ordinance and other regulations may be identified during the Site Plan Process. Review comments pertaining specifically to the Site Plan set will be issued at that time. 10) The applicant shall be aware that Building Permits are required to proceed with any construction activities on the project site. The permit applications must comply with the approvals and conditions granted through the Architectural Review Certification and Site Plan Review process. 11) The applicant should be aware that a Sign Permit is required to proceed with the placement of signage on the property. 12) The existing building has a cornerstone/date stone that should be retained. There may also be an opportunity to add a plaque or other method outlining the history of the building (time of service as the Dover Post Office). Historic District Commission Action Required The Historic District Commission shall consider the proposal and provide a recommendation in regard to the Architectural Review Certification for the Old Post building and associated Site Improvements. The recommendation should reflect consideration of the Design Standards and Guidelines for the City of Dover Historic District Zone. 32

Page 33

Item 4. 33

Page 34

Item 4. 34

Page 35

Item 4. THE OLD POST An Adaptive Reuse, Mixed-Use Development 55 Loockerman Plaza | Dover, De 35

Page 36

Item 4. PROPOSED DEVELOPMENT THE OLD POST (2) 2,500 SF RETAIL UNITS 36 APARTMENT UNITS 2,000 SF BUSINESS Apartment Entrance on Innovation Way Proposed Development 2 36

Page 37

Item 4. THE OLD POST INNOVATION WY PROPOSED 3-STORY ADDITION 31,500 SF EXISTING BUILDING 4,560 SF LOOCKERMAN PLAZA Site Plan Proposed Development 3 37

Page 38

Item 4. PROPOSED DEVELOPMENT THE OLD POST Front Facade Proposed Development 4 38

Page 39

Item 4. HISTORICAL CONTEXT THE OLD POST 1. 1. 1 Images courtesy of Delaware Public Archives historical context 5 39

Page 40

Item 4. BEFORE & AFTER THE OLD POST Intersection E Loockerman St & Legislative Ave BEFORE & AFTER 6 40

Page 41

Item 4. BEFORE & AFTER THE OLD POST Library Entrance on Loockerman Plaza BEFORE & AFTER 7 41

Page 42

To match Existing Brick Existing Brick New Brick Item 4. Solider Course EFIS New Addtion Limestone Finish Coping Detail Proposed New Existing Structure BUILDING ELEVATIONS EFIS Brick Addition To match Existing Brick Brick Veneer 35' - 0" Brick Columns Existing Building 33' - 2" THE New Wood Trim to Match Existing New Addtion Solider Course Glass Railing OLD POST Coping Detail Proposed New Existing Structure Existing Asphalt Shingles Addition Brick Veneer 35' - 0" Solider Coursing Existing Asphalt New Wood Trim to Existing Building Brick Columns Match Shingles 33' - 2" Existing New Wood Glass Railing Trim to Match The Old Post Existing EFIS - Limestone Finish New Wood Existing Asphalt Shingles Trim to Match Proposed Windows Existing Solider Coursing Existing Asphalt New Wood Trim to Elevations Shingles Match Existing Painted Wood Surround New Front Door to Match Original Wood Door Proposed Glass EFIS - Limestone Painted Wood Surround Finish Nanawall Door or New Wood New Replacement Shutters & Windows to Similar Trim to Match Match Existing Proposed Windows West Existing 1 1/8" = 1'-0" Painted Wood Surround New Front Door to Match Original Wood Door Proposed Glass Painted Wood Surround Nanawall Door or New Replacement Shutters & Windows to Similar Match Existing South Elevation Solider Course Proposed New Coping Detail Existing Structure New Addition Addition 35' - 0" Brick Veneer Glass Railing Existing Building Solider Coursing 33' - 2" Existing Brick Columns Solider Course Asphalt Coping Detail Shingles Existing Structure New Addition Black Aluminum Brick Veneer Railing on Juliet Glass Railing Balcony New Wood Trim to Match REV RE ng Existing Solider Coursing Proposed Firm N Windows & Brick Columns Sliding Glass Door Black Aluminum EFIS - Limestone New Wood Railing on Juliet Finish d Trim to Match Balcony atch Existing REV REV DATE DESCRIPTION Proposed Firm Name and Address : Windows & Sliding Glass Projec New Replacement Prefab Metal Door Lighthouse Construction, Inc. 859 Golf Links Lane, Suite 1 Shutters & Windows to Canopy Magnolia, DE match existing EFIS - Limestone d Finish atch South 2 East Elevation 1/8" = 1'-0" Project Name and Address : New Replacement Prefab Metal Projec Shutters & Windows to Canopy The Old Post The Ol Building Elevations 8 match existing Date : Issue D Enter address here 42 Scale : As ind

Page 43

EFIS Limestone Finish EFIS Brick To match Existing Brick Existing Brick Item 4. New Brick New Addition Proposed New EFIS Addition Limestone Finish Existing Structure 35' - 0" EFIS Brick To match Existing Brick Solider Course New Wood Trim Existing Building THE Coping Detail to Match Existing 33' - 2" Brick Veneer OLD POST New Addition New Replacement Windows Proposed New Solider to Match Existing Existing Structure Addition Coursing 35' - 0" Brick Columns Solider Course New Wood Trim Existing Building Coping Detail to Match Existing 33' - 2" New Brick to Match Brick Veneer Existing Brick & New Replacement Windows Pattern Solider to Match Existing Coursing EFIS - Limestone Finish Brick Columns Level 1 New Brick to Match0' - 0" Proposed Existing Brick & Windows Pattern EFIS - Limestone Finish Level 1 0' - 0" Proposed Windows East 1/8" = 1'-0" North Elevation Existing Asphalt Shingles New Addition Proposed New Solider Course Coping Detail Existing Structure Addition 35' - 0" Brick Existing Building Veneer 33' - 2" Existing Asphalt Shingles Solider Coursing New Addition Solider Course Proposed New Coping Detail Existing Structure Addition Brick 35' - 0" Columns Black AluminumBrick New Wood Existing Building Railing on Juliet Veneer Trim to Match 33' - 2" Balcony Existing Solider Proposed Coursing Windows & Sliding Glass Brick Door Columns EFIS - Limestone Black Aluminum New Wood Finish Railing on Juliet Trim to Match Balcony Existing New Replacement Shutters & Windows to Match Existing Proposed Windows & Sliding Glass Door West EFIS Elevation Finish - Limestone New Replacement Shutters & Windows to Match Existing Building Elevations 9 North 1/8" = 1'-0" 43

Page 44

Item 4. SITE OLD DOVER POST PRELIMINARY PLANS 1 2 TAX MAP ID ENGINEER DATA COLUMN 2-05-07705-04-5300-00001 OWNER DEVELOPER ST. JONES RIVER WATERSHED DAVIS, BOWEN & FRIEDEL, INC. CITY OF DOVER LIGHTHOUSE CONSTRUCTION, LLC. 1 PARK AVENUE PO BOX 475 859 GOLF LINKS LANE SUITE 1 MILFORD, DE 19963 DOVER, DE 19901 MAGNOLIA, DE 19962 JAMIE SECHLER EQUITY OWNER G. MICHAEL GLICK PHONE: (302) 424-1441 OLD POST, LLC. PHONE: (302) 677-1965 EAST DOVER HUNDRED EMAIL: JLS@dbfinc.com 859 GOLF LINKS LANE SUITE 1 MAGNOLIA, DE 19962 EMAIL:MGLICK@LHCONSTRUCTION.COM LOCATION MAP 1" = 1/2 MILE KENT COUNTY, DELAWARE 3 DATUM HORIZONTAL VERTICAL DBF PROJECT NO. 2916A039 JANUARY 2025 NAVD 83 (DE STATE PLANE) NAVD 88 4 ZONING EXISTING PROPOSED C2 C2 5 LAND USE EXISTING PROPOSED OFFICE MIXED USE COMMERICAL AND MULTIFAMILY R1UBV 6 FLOODPLAIN THE PROPERTY IS IMPACTED BY THE 100 YEAR FLOODPLAIN AS DETERMINED BY VAT FEMA PANEL 10001C0167H , DATED MAY 5, 2003. KINGS HW INNO 7 GROUNDWATER RECHARGE ALL OF THE PROPERTY IS LOCATED IN AN AREA OF GOOD GROUNDWATER SITE Y. RECHARGE. ION N ST . 8 WELLHEAD PROTECTION AREA THE PROPERTY IS NOT LOCATED IN A WELLHEAD PROTECTION AREA. RMA CKE WY. E. LOO 9 WETLANDS THE PROPERTY IS NOT IMPACTED BY STATE AND FEDERALLY REGULATED LEG WETLANDS. LAZA AN P TIVE ER M 10 UTILITIES WATER SEWER OC K ISLA LO CITY OF DOVER CITY OF DOVER FED OLD DOVER POST L ERA . D. 11 CODE COMPLIANCE REQUIRED PROPOSED AVE . BLV G JR KIN FRONT SETBACK 10 FT 10 FT ST. ER KENT COUNTY, DELAWARE S T. UTH O RTH T IN L SIDE SETBACK 10 FT 10 FT E. N MAR REAR SETBACK 10FT 10 FT NWI WETLANDS REAR SETBACK W/ ADJOINING 15 FT 15 FT 1" = 400' RESIDENTIAL MAXIMUM BUILDING HEIGHT 150 FT 150 FT PARKING OFFICE: 1 SPACE PER 300 SF. OF FLOOR 62 SPACES (INCLUDING 3 ADA AREA ACCESSIBLE SPACES), AND 29 SHARED SPACES WITH CITY OF DOVER ON 2 ADJACENT PARCEL LOT COVERAGE 85.00% 76.63% INNO 12 AREAS 3 KINGS HW VAT PARCEL AREA 1.267 AC. SITE Y. 1 ION IMPERVIOUS COVER 0.971 AC. (76.63%) T. AN S WY. O CKE RM 13 PROPOSED LAND USE AREAS SITE E. LO COMMERCIAL PROPERTY I BUILDINGS/PARKING 0.853 AC. (67.32%) LEG 4 PLAZA T SIDEWALKS 0.118 AC. (9.31%) SLA ER MAN LOOCK 5 OPEN SPACE 0.296 AC. (23.37%) 6 IVE FED TOTAL 1.267 AC. (100%) . ERMA N ST. AVE VD. ERA OCK BL W. LO JR. ING RK L ST T. HE S LUT O RTH RTIN MA . E. N FEMA FLOOD MAP PANEL #10001C0167H SCALE: 1" = 1/2 MILE SacB Lo 0 400 800 1200 HkB W LOCATION MAP INNO SCALE: 1"=400' KINGS HW VAT Y. SITE ION NS T. RMA WY. OO CKE E. L LEG LAZA AN P OCK ERM ISLA LO INDEX OF SHEETS FED TIVE PL-01 PRELIMINARY TITLE ERA AVE LV D. GJ R. B PL-02 EXISTING CONDITIONS L ST . KIN ER ST. . UTH PL-03 PRELIMINARY SITE PLAN ORT H T IN L E. N MAR PL-04 PRELIMINARY LANDSCAPE PLAN SOILS MAP 1" = 400' P:\Lighthouse\2916A039 Old Dover Post\PRELIM\2024-12-19 PRELIM TITLE.dwg Jan 17 , 2025 - 8:31am WESC SOILS DATA OWNER STATEMENT LABEL SOIL NAME TYPE HkB Handbrook Urban Land Complex, 0 to 5 Percent Slopes B I, THE UNDERSIGNED, HEREBY STATE THAT I AM THE OWNER OF THE PROPERTY DESCRIBED AND SHOWN ON THIS PLAN, THE PLAN WAS MADE AT MY DIRECTION, I ACKNOWLEDGE THE SAME TO BE MY ACT AND DESIRE THE PLAN BE RECORDED Date: JANUARY 2025 ACCORDING TO LAW. ADJACENT PROPERTY OWNERS Scale: AS NOTED 1 2-05-07705-04-5500-00001 CITY OF DOVER 35 LOOCKERMAN ST., DOVER, DELAWARE 19901 Dwn.By: CAW 2 2-05-07705-04-5100-00001 STATE OF DELAWARE 89 KINGS HWY., DOVER DELAWARE 19901 Proj.No.: 3 2-05-07705-04-5200-00001 CENTRAL DOVER OFFICES, INC. 9 E LOOCKERMAN ST., DOVER, DELAWARE 19901 G. MICHAEL GLICK DATE 2916A039 121 MARTIN L KING JR BLVD., DOVER, DELAWARE 19901 LIGHTHOUSE CONSTRUCTION LLC. 4 2-05-07709-05-1300-00001 STATE OF DELAWARE 859 GOLF LINKS LANE, SUITE 1 5 2-05-07709-05-1200-00001 STATE OF DELAWARE 60 LOOCKERMAN ST., DOVER, DELAWARE 19901 MAGNOLIA, DE 19962 6 2-05-07709-05-1100-00001 STATE OF DELAWARE 401 FEDERAL ST., DOVER, DELAWARE 19901 ENGINEER'S STATEMENT PRELIMINARY I, JAMIE L. SECHLER, P.E., HEREBY STATE THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, THAT THE INFORMATION SHOWN HEREON HAS BEEN TITLE PREPARED UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE. Dwg.No.: by JAMIE L. SECHLER, P.E. DATE PL-01 DAVIS, BOWEN & FRIEDEL, INC. 1 PARK AVE. MILFORD, DELAWARE, 19963 44 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2024

Page 45

Item 4. E. LOOCKERMAN ST. (KCR023) INNOVATION WY. LEGISLATIVE AVE. (KCR72) OLD DOVER POST KENT COUNTY, DELAWARE COMMERCIAL PROPERTY P:\Lighthouse\2916A039 Old Dover Post\PRELIM\2025-01-14 PRELIM PLANS.dwg Jan 17 , 2025 - 8:33am WESC Date: JANUARY 2025 Scale: 1"=20' Dwn.By: CAW Proj.No.: 2916A039 LOOCKERMAN PLAZA EXISTING CONDITIONS Dwg.No.: 0 20 40 60 PL-02 45 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2024

Page 46

Item 4. SITE LEGEND: A STOP SIGN & STOP BAR B HANDICAP PARKING SPACE WITH SIGN E. LOOCKERMAN ST. (KCR023) C MODIFIED 1-6 CURB D DUMPSTER E PROPOSED SIDEWALK F PROPOSED ADA RAMP G PROPOSED FIRE LANE (4" SOLID YELLOW DEMARCATION AND/OR YELLOW PAINTED CURB) H R7-107A "NO PARKING - FIRE LANE" SIGN I FIRE DEPARTMENT CONNECTION J PROPOSED 4' TALL BLACK ALUMINUM FENCE K PROPOSED GATE L PROPOSED STEPS M PROPOSED DOG RUN N PROPOSED PATIO HATCH LEGEND: EXISTING CONCRETE SURFACE 55' EXIST. R.O.W. 10' SIDE INNOVATION WY. SETBACK LEGISLATIVE AVE. (KCR72) 5 5' R1 5' R1 R1 ' 5' R1 5' 5' 5' OLD DOVER POST CONNECT TO EXIST. SEWER MANHOLE KENT COUNTY, DELAWARE J F C K F J F F 5' A A L R 5' 5' J C L ' R5 M R5 ' M M K 9' PE H 18' G PROPOSED SEWER LATERAL 9' F 9' N 18' 6FW EXIST. PROPOSED FIRE LINE COMMERCIAL PROPERTY 6FW R.O.W. PROPOSED WATER 8W VARIES 18' PE SERVICE LINE 10 G PROPOSED 10 F 12 24' 3 STORY 4 PROPOSED CONNECTION TO BUILDING EXIST. WATER MAIN WITH WET 9' 6 ADDITION TAP TAPPING SLEEVE 31,500 S.F. EXISTING AWNING 42,000 9' EXISTING BUILDING 18' 9' 4,560 S.F. 5' 10' H 5' H 5' R1 C H 10' G 24' G C 24' 15' REAR R5' R5 18' 18' ' SETBACK C D N 9' 9' 24 J K PROPOSED SHARED PARKING WITH THE CITY OF DOVER P:\Lighthouse\2916A039 Old Dover Post\PRELIM\2025-01-14 PRELIM PLANS.dwg Jan 17 , 2025 - 8:35am WESC Date: JANUARY 2025 Scale: 1"=20' Dwn.By: CAW Proj.No.: 2916A039 LOOCKERMAN PLAZA PRELIMINARY SITE PLAN Dwg.No.: 0 20 40 60 PL-03 46 THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2024

Back to this meeting